Section! General
A Title:
This Ordinance shall be known as the Wireless Telecommunications Facility Siting Ordinance of
the Town New Portland, ME. Here in after referred to as " the Ordinance".
B Authority:
This Ordinance is adopted pursuant to the enabling provisions of Article VII, Part 2, Section 1 of
the Maine Constitution; the provisions of Title 30-4 MRSA Section 3001, and the provisions of
the Planning and Land Use Regulation Act, Title 30-A MRSA Section 4312 et seq.
Cc Purpose:
The purpose of this Ordinance is to provide a process and a set of standards for the construction
of wireless telecommunication facilities in order to:
- Implement a municipal policy conceming the provision of wireless telecommunication
services, and the siting of their facilities.
- Establish clear guidelines, standards and time frames for the exercise of municipal
authority to regulate wireless telecommunication facilities. .
- Ensure that all wireless telecommunication carriers providing facilities within the Town
comply with the Ordinances of New Portland.
- Ensure that the Town can continue to fairly and responsibly protect the public health,
safety and welfare.
- Encourage the colocation of wireless telecommunication facilities, thus helping to
minimize adverse visual impacts on the community.
- Further the goals and policies of the comprehensive plan, while promoting orderly
development of the town with minimal impact on existing users, and protect the scenic
and visual character of the community.
- Ensure that towers do not unreasonably detract from the rural character and beauty of the
Town.
D Applicability:
The provisions of this Ordinance apply to all construction and expansion of wireless
telecommunication facilities. The following are exempt from the provisions of this Ordinance:
- Temporary wireless telecommunication facilities for emergency communications by
public officials.
- Amateur ham radio tower licensed by the Federal Communications Commission.
- Parabolic antennas less than 7 feet in diameter, that are an accessory use of the property.
- Maintenance, repair or reconstruction of a wireless telecommunications facility and
related equipment, provided that here is no change in the height or any other dimension
of the facility.
- ' Temporary wireless telecommunication facility, in operation fir a maximum period of
180 days. .
- Antennas as accessory uses. An antenna that is an accessory use to a residential dwelling
unit.
E Effective Date:
The effective date of this Ordinance shall be the date of the adoption by the Town of New
Portland.
"oa
F Validity and Severability:
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of this Ordinance.
G Availability:
A certified copy of this Ordinance shall be filed with the Town Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost to be
charged to the person making the request. Notice of availability of this Ordinance shali be posted
in the Town Office.
H Conflicts with other Ordinances:
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of
this Ordinance or any other ordinance, regulation, or statute, the more restrictive provision shall
apply.
I Application Fee(s):
For a public entity (aon- commercial) exempt
for all others, the applications shall be accompanied by the "following non-refundable fee of
$1000.00 for commercial operators made payable to the Town of New Portland.
J Amendments:
The ordinance may be amended by Town Meeting vote. Amendments may be initiated by a
request of the Planning Board, the Board of Selectman, or by petitions bearing the signatures of
registered New Portland voters equal to, or in excess of ten percent (10%) of the votes cast in the
last gubernatorial election in the Town. The Board of Selectman shall conduct a public hearing
on any proposed amendment,
K Appeals:
The Board of Appeals shall have the power to hear and decide appeals when it is alleged
that the Planning Board disregarded pertinent information when making their decision or
did not follow the procedural guidelines of this Ordinance.
1 Appeals Procedure
A Making an Appeal
, Anappeal resulting from any decision on the part ofthe Board may be taken
to the Board of Appeals by an aggrieved party. Such appeal shall be taken
within thirty (30) days of the date of the decision appealed from, and not .
otherwise, pursuant to the procedures of the New Portland Board of Appeals
Ordinance.
L Administration and Enforcement:
1 The Planning Board shall administer this Ordinance and no person shall construct or
expand a wireless telecommunication facility without the approval of the Board. The
Planning Board shall review all wireless telecommunication applications and make
, written findings on whether the proposed facility complies with this Ordinance
2 The Code Enforcement Officer shall enforce this Ordinance. If the Code Enforcement
Officer finds that any provision of this Ordinance has been violated, the Code
Enforcement Officer shall notify in writing the person responsible for such violation,
indicating the nature of the violation, and ordering the action necessary to correct it. The
-2-
Code Enforcement Officer shall order correction of the violation. The selectman may
take Jegal action to ensure compliance with the Ordinance, and may enter into
administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without court action.
M Penalties: ,
Any person who owns or controls any building or property that violates this
Ordinance shall be fined in accordance with Title 30-A MRSA Section 4452. Each day such
violation continues after notification by the Code Enforcement Officer shall constitute a separate
offense. Each offense shall have a maximum fine of two thousand five hundred dollars
($2,500.00). There is a twenty-five thousand dollar ($25,000.00) fine per offense upon the
second conviction within two (2) years for violations under the Ordinance.
Section 2 Approval Process:
No person shall construct or expand a wireless telecommunications facility without
approval of the Planning Board.
A Applications:
All persons seeking Planning Board Approval shall submit an application on the forms provided
by the Town of New Portland. The applicant shail have the burden of proof to show that the
application meets all the provisions of this Ordinance.
Pre-application conference:
All persons seeking approval of the Planning Board under this ordinance shall meet with the CEO
no less than thirty (30) days before filing an application. At this meeting, the CEO shall explain
to the applicant the ordinance provisions, as weil as application forms and submissions that will
_ be required under this ordinance.
B Planning Board Approval Application:
Six copies of the application must be submitted to the Planning Board The application must
include the following material and information:
1 A receipt from the Town showing that the application fee has been paid.
2 Documentation of the applicant's right, title, or interest in the property where the facility
is to be sited, including the name and address of the property owner and applicant.
3 A copy of the FCC license for the facility or a signed statement from the owner or
operator of the facility attesting that the facility complies with current FCC regulations.
4 Identification of districts, sites, buildings, structures or objects, significant in American
history, architecture, archeology, engineering or culture, that are listed, or eligible for
listing in the National Register of Historic Places that are immediately proximate to the
site.
5 Location map and elevation drawings of the proposed facility and any other proposed
structures, showing color, and identifying structural materials.
6 For the proposed facility or expansion of a facility, a signed statement that commits the
owner of the facility and his, her or its assigns or successors in interest to:
a Respond in timely manner to a request for information from a potential
colocation applicant, in exchange for a reasonable fee not in excess of the actual
m cost of preparing a response.
; 4.
b Negotiate in good faith for shared use by the third parties;
c Allow shared use if an applicant agrees in writing to pay reasonable charges for
colocation; and
d Require no more than a reasonable charge for shared use based on community
rates and generally accepted accounting principles. This may include but is not
limited to a pro rata share of the cost of developing and maintaining the facility
including all of the costs of adapting the tower or equipment to accommodate a
shared user without causing electromagnetic interference.
e Require the colocator to adhere to all the provisions of the ordinance, including
abandonment.
7 A USGS 7.5 minute topographic map showing the location of all structures and wireless
telecommunication facilities above 150 feet in height above ground level, except
antennas located on roof tops, within a 5 mile radius of the proposed facility, uniess this
information has been previously made available to the municipality. This information
may be met by submitting current information (within 30 days of the date of the
; application is filed) from the FCC Tower Registration Database.
8 A site plan prepared and certified by a professional engineer registered in Maine that includes
the following:
a The location, type, and height of the proposed facility, antenna capacity, on-site
and abutting off-site land uses, means of access, setbacks from property lines and
all applicable American National Standards Institute (ANSD technical and
structural codes.
b Certification by the applicant that the proposed facility complies with all FCC
standards for radio emissions.
c A boundary survey for the proposed project performed by a land surveyor
licensed by the State of Maine.
9 A scenic assessment, consisting of the following:
a Elevation drawings of the proposed facility, and any other proposed structures,
showing the height above ground level;
b A landscaping plan indicating the proposed placement of the facility on the site;
location of existing structures, trees, and other significant site features; the type
and location of plants proposed to screen the facility; the method of fencing, the
color of the structure, and the proposed lighting method; and
c Photo simulations of the proposed facility taken from perspectives determined by
the Planning Board or their designee during the pre-application conference. Each
photo must be labeled with the line of sight, elevation, and with the date taken
imprinted on the photograph. the photos must show the color of the facility and
the method of screening. At the discretion of the board, an appropriately sized
balloon may floated to the height of the proposed tower in lieu of or in addition
to the simulations.
10 A narrative discussing the extent to which the proposed facility would be visible from or
within a Town designated scenic resource; the tree line elevation of vegetation within
1000 feet of the facility; and the distance to the proposed facility from Town designated
scenic viewpoints.
11 A written description of how the proposed facility fits into the applicant's
telecommunications network. This submission requirement does not require disclosure of
confidential business information.
12 Evidence demonstrating that no existing building, site or structure can accommodate the
applicant's proposed facility, the evidence for which may consist of the following:
- Evidence that no existing facility is located within the targeted market coverage
area as required to meet the applicant's engineering requirements;
- Evidence that existing facilities do not have sufficient height or cannot increase
~4-
in height at a reasonable cost to meet the applicant's engineering requirements;
- Evidence that existing facilities do not have the sufficient structural strength to
support the applicant's proposed antenna and related equipment specifically:
i.} Planned, necessary equipment would exceed the structural capacity of the
existing facility, considering the existing and planned use of those facilities, and
these existing facilities cannot be reinforced to accommodate the new equipment.
ii.) The applicant's proposed facility would be incompatible with the existing
facility.
- Evidence that fees, costs or contractual agreements required by the owner in
order to share or adapt an existing facility are unreasonable.
- Evidence that the applicant has made diligent good faith effort to negotiate
colocation on an existing facility, building, or structure and has been denied
access,
13 A form of performance guarantee that has been deemed acceptable by the Selectmen of
the Town of New Portland in an amount determined under Section 3 A.1.k. The
performance guarantee is to pay for the cost of removing the facility if it is abandoned.
(The applicant may finalize the performance guarantee agreement with the Town of New
Portland after receiving Planning Board conditional approval pending the final
performance guarantee agreement from the Board of Selectmen)
14 Evidence that the applicant has met all public hearing requirements.
15 A signed statement stating that the owner(s) of the wireless telecommunications facility
and his, her, or its successors and assigns agree to be bound by all the provisions of the
permit and the ordinance.
Cc Submission Waiver:
The Planning Board as appropriate may waive any of the submission requirements based upon a
, written request from the applicant submitted at the time of application. A waiver of any
submission requirement may be granted only if the Planning Board finds in writing that due to
special circumstances of the application, the information is not required to determine compliance
with the standards of this Ordinance.
D Planning Board Application Processing Procedure:
The following application procedure shall be followed for all applications submitted to the
Planning Board for approval.
1 The applicant shall submit a complete application to the Planning Board
; 2 A dated receipt shall be issued to the applicant indicating that the application has been
filed with the Town.
3 Within 35 days of receipt of an application the Planning Board shall determine whether
or not the application is complete. The Planning Board shall notify the applicant in
writing whether the application is complete and if it is not complete of the materials
necessary in order to make it complete.
4 A public hearing shall be scheduled at least 35 days after the Planning Board determines
that a complete application has been submitted.
5 The applicant is responsible for supply the names and addresses of all property owners
within 1000 feet, and property abutters of the proposed facility. All property owners
located within 1000 feet, and property abutters of the proposed facility shall be mailed a
notice by certified return receipt indicating the date, time, place, and purpose of the
hearing. The notice shall be mailed no later than 10 days prior to the scheduled hearing.
a) Failure of any person to receive a notice shall not invalidate the public hearing
nor require the holding of another public hearing. ,
-5-
6 A notice shall be placed in a newspaper of general circulation in the area indicating the
date, time, place and purpose of the hearing. A total of two notices published on separate
dates shall be placed at least 7 days prior to the hearing.
7 The Planning Board shall hold a public hearing on the application and shall within 60
days of the public hearing make a final decision on whether to approve the application,
approve the application with conditions or deny the application. The date of final decision
may be extended upon mutual consent of the Planning Board and the applicant.
8 The Planning Board may conditionally approve the application pending the final
agreement between the applicant and the Board of Selectmen concerning the performance
guarantee apreement.
9 The decision shall be in writing and provided to the applicant.
E Public Hearing Requirements:
The Planning Board shall hold a public hearing on all applications requiring Planning Board
approval. The Planning Board shall set the date, time and place of the public hearing after it has
determined that a complete application has been submitted.
Section 3 Review Standards
A Planning Board Approval Standards:
1 An application for approval by the Planning Board must meet all of the following
standards.
a The wireless telecommunication facility shall not be located within the shoreland
zoning districts, as designated in the Town of New Portland Shoreland Zoning
; Ordinance.
- b A wireless telecommunication facility and related equipment must be designed
and constructed to accommodate expansion for future colocation, subject to the
height limitation posed by the tower design.
c A new or expanded wireless telecommunication facility must be setback 105% of
its height from all property lines. The setback may be satisfied by including the
areas outside of the property boundary by an easement.
d A new wireless. telecommunication facility. and related equipment must be
screened from view by abutting properties to the maximum practicable extent. A
combination of existing or proposed vegetation or fences and berms may be
used...
e A new wireless telecommunication facility must be fenced to discourage trespass.
f A new wireless telecommunication facility must be illuminated only as necessary
to comply with FAA or other applicable state and federal requirements. Security
lighting may be installed as long as it is shielded to retain light within the
boundaries of the site to the maximum extent possible. Strobe lights are not to be
used unless mandated by the FAA.
£ A new wireless telecommunication facility must be constructed with materials
and colors that blend with the surrounding natural or built environment to the
maximum extent possible.
h A new wireless telecommunication facility must comply with the current
Electronic Industries Association Telecommunication Industries Association
(BIA/TIA) 222 Revision Standard entitled " Structural Standards for Steel
-6-
Antenna Towers and Antenna Supporting Structures", as amended, or its
successor.
i The proposed facility to the greatest degree practicable will have no unreasonable
adverse impact upon a historic district site or structure which is currently listed
on or eligible for listing on the National Register of Historic places.
j Tower height shail not exceed 190 feet.
k A performance guarantee in the form of a continuous corporate surety bond,
irrevocable letter of credit, or an escrow account in favor of the Town equal to
125% of the estimated demolition and removal cost of the tower and associated
facilities if abandoned at any time by the applicant. Such performance guarantee
shail be satisfactory to the Board of Selectmen as to the issuer, form, sufficiency,
surety and manner of execution. All performance guarantees shall be on a
continuous basis, with any provision for cancellation to include that a minimum
30 day notice of cancellation or non-renewal be sent by certified mail to the
Town of New Portland. If the holder of an approval under the Ordinance wishes
to transfer that approval, the transferee must submit a replacement performance
guarantee to the Board of Selectman, before transfer. The Selectman shall
approve the replacement guarantee if they find it to be a suitable equivalent to the
original guarantee.
B Amendment to an Approved Application
The Planning Board in accordance with the application procedure established in this Ordinance
must approve any changes to an approved application, including but not limited to the transfer of
an approval issued under the Ordinance to any third-party
Cc Abandonment
A wireless telecommunication facility that is not operated for a continuous period of 12 months
shall be considered abandoned. The Code Enforcement Officer shall notify the owner of an
abandoned facility in writing and order the removal of the facility within 90 days of receipt of the
written notice. The owner of the facility shall have 30 days from the receipt of the notice to
demonstrate to the Code Enforcement Officer that the facility has not been abandoned.
if the owner fails to show that he facility is in active operation, the owner shall have 60 days to
remove the facility. If the facility is not removed within this time period, the municipality may
remoye_the facility at the owner's expense. The owner of the facility shall pay all site
reclamation costs deemed necessary and reasonable to return the site to its pre-construction
condition, including the removal of roads, and reestablishment of vegetation, and the municipality
may draw upon the performance guarantee an amount equal to the municipality cost of facility
removal,
If performance guarantee has been given to the municipality for removal of the facility, the owner
of the facility may apply to Board of Selectmen for release of the performance guarantee when
the facility and related equipment are removed to the satisfaction of the Board of Selectmen.
Section 4 Definitions
The terms used in this ordinance shall have the following meanings:
Antenna: means any system of poles, panels, rods, reflecting discs or similar devices used for the
transmission or reception of radio or electromagnetic frequency signals.
-7-
. Antenna Height: means the vertical distance measured from the base of the antenna support
structure at grade to the highest point of the structure, even if said highest point is an antenna.
Measurement of the tower height shall include antenna, base pad, and other appurtenances and
shall be measured from the finished grade of the facility site. If the support structure is on sloped
grade, then the average between the highest and the lowest grades shall be used in calculating the
antenna height.
Colocation: means the use of a wireless telecommunications facility by more than one wireless
telecommunications provider.
Expansion: means the addition of antennas, towers, or other devices to an existing structure.
FAA: means the Federal Aviation Administration, or its lawful successor.
FCC: means the Federal Communications Commission, or its lawful successor.
Height: means the vertical measurement from a point on the ground at the mean finish grade
adjoining the foundation as calculated by averaging the highest and lowest finished grade around
the building or structure to the highest point of the building or structure. The highest point shail
exclude farm building components, flagpoles, chimneys, ventilators, skylights, domes, water
towers, bell towers, church spires, processing towers, tanks, bulkheads, or other building
accessory features usually erected at a height greater than the main roofs of buildings.
Historic or Archeological Resources: means resources that are:
- Listed individually in the National Register of Historic Places or eligible for listing on the
National Register;
- Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic district or a district preliminarily determined by the
Secretary of the Interior to qualify as a registered historic district;
- Individually listed on a state inventory of historic places in states with historic preservation
programs approved by the Secretary of the Interior;
- Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified by Secretary of the Interior through the Maine
Historic Preservation Commission; or ;
- Areas identified by a governmental agency such as the Maine Historic Preservation Commission
as having significant value as an historic or archeological resource, and any areas identified in the
Town's comprehensive plan, which have been listed or are eligible to be listed on the National
Register of Historic Places.
Historic District means a geographically definable area possessing a significant concentration, linkage or
continuity of sites, buildings, structures or objects united by past events or aesthetically by plan or
physical development and identified in the Town's comprehensive plan, which is listed or is eligible to be
listed on the National Register of Historic Places. Such historic districts may also comprise individual
elements separated geographically, but linked by association or history.
Historic Landmark: means any improvement, building or structure of particular historic or architectural
significance to the Town relating to its heritage, cultural, social, economic or political history, or which
exemplifies historic personages or important events in Socal, state or national history identified in the
Town's comprehensive plan, which have been listed or are eligible to be listed on the National Register of
Historic Places.
_8-
Line of Sight: means the direct view of the object from the designated scenic resource.
Parabolic Antenna: means an antenna, which is bowl shaped, and designed for the reception and or
transmission of radio frequency communication signals in a specific directional pattern. (also known as a
satellite dish).
Principal Use: means the use other than one which is wholly incidental or accessory to another use on the
same premises.
Public Recreational Facility: means a regionally or locally significant facility, as defined and identified
either by State statute or in the Town's comprehensive plan, designed to serve the recreational needs of
municipal property owners.
Designated Scenic Resource: means that specific location, view, or corridor, as identified as a scenic
resource in the Town's comprehensive plan of by a State or Federal agency, that consist of:
- A three dimensional area extending out from a particular viewpoint on public way or within a
public recreational area, focusing on a single object, such as a mountain, resulting in a narrow
corridor, or a group of objects, such as a downtown skyline or mountain range, resulting in a
panoramic view corridor; or
- Lateral terrain features such as valley sides or woodland as observed to either side of the
observer, constraining the view into a narrow or particular field, as seen from a viewpoint on a
public way or within a public recreational area.
Targeted Market Coverage Area: means the area which is targeted to be served by this proposed
telecommunication facility.
Unreasonable Adverse Impact: means that the proposed project would produce an end result which is:
- Excessively out of character with the designated scenic resources affected, including existing
buildings, structures and features within the designated scenic resource, and
- Would significantly diminish the scenic value of the designated scenic resource.
Viewpoint: means that location which is identified either in the Town's comprehensive plan or by a state
or federal agency and which serves as the basis for the location and determination of a particular
designated scenic resource.
Wireless Telecommunication Facility: means any structure, antenna, tower, or other device which
provides radio/television transmission, commercial mobile wireless services, unlicensed wireless services,
cellular phone services, specialized mobile radio communications (SMR) , common carrier wireless
exchange phone services, common carrier wireless exchange access services, and personal
communications service (PCS), or pager services.