Town of Newburgh
Solar Ordinance
July 12, 2023
TOWN OF NEWBURGH, MAINE
SOLAR ENERGY ORDINANCE
TABLE OF CONTENTS
PAGE
SECTION 1 - PURPOSE 2
SECTION 2 - DEFINITIONS 2
SECTION 3 - APPLICABILITY 2
SECTION 4 - GENERAL STANDARDS AND APPLICABILITY 3
SECTION 5 - DIMENSIONAL STANDARDS 3
SECTION 6 - PERFORMANCE STANDARDS 4
SECTION 7 - SITE PLAN APPLICATION AND REVIEW 8
SECTION 8 - REVIEW PROCEDURE AND PROCESS 9
SECTION 9 - FEES 9
SECTION 10 - LEGAL ACTION AND VIOLATIONS 9
ADOPTED: Newburgh Town Council June 14. 2023
Effective: July 1, 2023
CERTIFIED BY: ___________________________
Cynthia Grant, Town Clerk
1
Town of Newburgh
Solar Ordinance
July 12, 2023
1. Purpose
a) Solar energy is a local, renewable, and non-polluting energy resource that can reduce
fossil fuel dependence on emissions. Energy generated from solar energy systems can be
used to offset energy demand on the grid, with benefits for system owners and other
electricity customers.
b) The use of solar energy equipment for the purpose of providing electricity and energy for
heating and/or cooling is an important component of the Town of Newburgh's
sustainability goals.
c) The standards that follow enable the accommodation of solar energy systems and
equipment in a safe manner while still allowing the quiet enjoyment of property.
d) This ordinance is intended to balance the need for reasonable standards and expedited
and streamline development review procedures.
2. Definitions
Solar Energy System: A device or structural design feature whose primary purpose is to
harvest energy by transforming solar energy into another form of energy or transferring heat
from a collector to another medium using mechanical, electrical, or chemical means.
Solar Energy System, Roof-Mounted: A Solar Energy System that is mounted on the roof of a
building or structure.
Solar Energy System, Ground-Mounted: A Solar Energy System that is structurally mounted to
the ground and is not roof-mounted.
1. Solar Energy System, Small-Scale is a ground-mounted system whose physical size
based on total airspace projected over the ground is less than 15,000 square feet
(approximately one-third of an acre):
2. Medium-scale Solar Energy system is on whose physical size based on total airspace
projected over a roof or on the ground is equal to or greater than 15,000 square feet but
less than 87,120 square feet (two acres); and
3. Large-scale Solar Energy System is one whose physical size based on total airspace
projected over a roof or the ground is equal to or greater than 87,120 square feet (two
acres).
3. Applicability
2
Town of Newburgh
Solar Ordinance
July 12, 2023
a) Notwithstanding the provisions of 1 M.R.S.A. section 302 or any other law to the
contrary, the requirements of this ordinance shall apply to all roof-mounted and ground
mounted solar energy systems modified or installed after the date of its enactment.
b) All solar energy systems shall be designed, erected, and installed in accordance with all
applicable codes, regulations, and standards.
c) Any upgrade, modification or structural change that alters the size, placement or output
of an existing solar energy system shall comply with the provisions of this ordinance.
d) For this ordinance, the Town of Newburgh's zoning districts are mapped and categorized
as follows:
Table 3.1 Use Table
Permitting Required for Solar Energy Systems
Rural
Residential
Commercial
Rooftop
SES
Y
Y
Y
Small-Scale Ground-
Mounted solar
MSP
MSP
MSP
Medium-Scale Ground
Mounted Solar
MJR
MJR
MJR
Large-Scale Ground-
Mounted Solar
N
N
N
Y = allowed N=Prohibited MSP= Minor Site Plan Review MJR= Major Site Plan Review
4. General Standards and Applicability
a) A solar energy system or device shall be installed or operated in the Town of Newburgh
provided it is compliant with this ordinance.
b) Permitting shall be determined by zone within the Town of Newburgh, type of solar
system, and proposed size. The Town of Newburgh has designated the proper permitting
process for each solar system in the above matrix entitled "Permitting Required for Solar
Energy Systems."
3
Town of Newburgh
Solar Ordinance
July 12, 2023
c) All Solar Energy Systems, Roof-mounted and Ground-mounted are subject to the
Dimensional Standards of Section 5 and the Performance Standards outlined in Section 6
of this ordinance.
5. Dimensional Standards
a) Solar Energy Systems, Roof-Mounted
i. Height:
1. In commercial zones, solar energy systems shall be mechanical
devices and, for purposes of height measurement, are restricted.
only to the extent consistent with other building-mounted
mechanical devices.
2. In all other zoning districts, such systems shall conform to the
maximum building height requirements of the zoning district in
which they are located. See Article 2.6 Table B.2 in the Town of
Newburgh's Land Use Ordinance for maximum building heights.
b) Solar Energy Systems, Ground-Mounted
i. Height standards for ground-mounted solar energy systems are dependent
on location and zoning district. Height shall be measured from the lowest
point of the structure above grade to the highest point of the facilities
when oriented at maximum tilt.
1. In all zoning districts, such systems shall not exceed sixteen (16)
feet in height when oriented at maximum tilt.
ii. Setbacks
1. Minimum setback shall conform to the requirements of the zoning
district in which the system is located. Article 2.6 Table B.2 of the
Town's Zoning ordinance for setback standards.
2. Additional setbacks may be required to mitigate visual and
functional impacts.
6. Performance Standards
a) Solar Energy Systems (including Roof-Mounted and Small-Scale) must conform with the
following standards:
4
Town of Newburgh
Solar Ordinance
July 12, 2023
i. Roof-mounted and building-mounted solar energy systems and equipment
are permitted by right unless they are determined by the Code.
Enforcement Officer to present one or more unreasonable safety risks,
including, but not limited to the following:
1. Weight load;
2. Wind resistance;
3. Ingress or egress in the event of fire or another emergency; or
4. Proximity of a ground-mounted system relative to buildings.
ii. All solar energy system installations shall be installed in compliance with
the manufacturer's instructions and the photovoltaic systems standards.
iii. All wiring shall be installed in compliance with the manufacturers.
instructions and NEC national electric code.
iv. Prior to operation, electrical connections must be inspected and approved
by the Code Enforcement Officer.
b) Medium-Scale Ground Mounted Solar Energy Systems
In addition to the standards in Section 1, large-scale and medium-scale ground-
mounted solar energy systems shall comply with the following:
i. Utility Connections:
Utility connections shall be underground wherever possible.
ii. Safety:
1. The solar system owner or project proponent shall provide a
copy of the Site Plan Review application to the Planning Board
for review and comment. The Planning Board shall base any
recommendation for approval or denial of the application upon
review of the safety of proposed system.
iii. Visual Impact:
1. Reasonable efforts, as determined by the Planning Board, shall
be made to minimize undue visual impacts by preserving
native vegetation, screening abutting properties, or other
5
Town of Newburgh
Solar Ordinance
July 12, 2023
appropriate measures, including adherence to height standards
and setback requirements.
iv. Land Clearing, Soil Erosion, and Habitat Impacts:
1. Clearing of natural vegetation shall be limited to what is
necessary for the construction, operation and maintenance of
ground-mounted solar energy systems or as otherwise
prescribed by applicable laws, regulations, and bylaws/
ordinances.
2. Removal of mature trees shall be avoided to the extent
possible.
3. Native, pollinator-friendly seed mixtures shall be used to the
extent possible.
4. Herbicide and pesticide use shall be minimized. No prime
agricultural soil or significant volume of topsoil shall be
removed from the site for installation of the system.
v. Fencing:
1. Where fencing is used, fences should be elevated by a
minimum of 5 inches to allow for the passage of small
terrestrial animals.
vi. Removal:
1. Solar energy systems that have reached the end of their useful
life or that have been abandoned consistent with this ordinance
shall be removed. The owner or operator shall physically
remove the installation no more than 150 days after the date of
discontinued operations. The owner or operator shall notify the
Town of Newburgh Planning Board of the proposed date of
discontinued operations and plans for removal.
2. Removal should consist of:
a. Physical removal of all solar energy systems, structures,
equipment, security barriers, and transmission lines
from the site.
b. Disposal of all solid and hazardous waste in accordance
with local, state, and federal wasted disposal
regulations.
6
Town of Newburgh
Solar Ordinance
July 12, 2023
c. Stabilization or re-vegetation of the site to minimize
erosion. Native, pollinator-friendly seed mixtures shall
be used to the maximum extent possible.
vii. Abandonment:
1. Absent notice of a proposed date of decommissioning or
written notice of extenuating circumstances, a medium scale
ground-mounted solar energy system shall be considered
abandoned when it fails to operate for more than 150 days.
2. A surety is required at the time of Planning Board review of a
Site Plan application for the assumption of any debt, default, non-
compliance with State and Federal laws or local
ordinances, or failure of the array falls to the principal
(contractor/developer/investor/solar company) and not the
obligee (owner).
3. At the time of Planning Board review of a Site Plan application
and permit, the applicant for a medium scale ground mount solar
array system shall identify how it shall provide a
performance guarantee payable to the benefit of the Town of
Newburgh, a municipal corporation, for all costs associated
with the removal of an approved solar energy system that has
been abandoned on public land. The performance guarantee
shall be equal to one hundred fifty (150) percent of the
estimated cost of removal. The performance guarantee can be
in the form of a Solar Contractor Surety Bond or Solar
Decommissioning Bond and may be acceptable to the Town as
determined by the planning board and legal counsel for the
Town of Newburgh. The financial guarantee shall include a
provision granting and guaranteeing the Town the authority to
access the funds and property and perform the
decommissioning if the facility is abandoned and the owner or
operator fails to meet their obligations to remove the solar
energy system. The applicant shall provide the Town with the
identified performance guarantee prior to the issuance of a
building permit by the Code Enforcement Officer for the solar
energy system. The owner or operator shall also be responsible
for notifying the Town in writing if the performance guarantee
is revoked, and in such cases, shall provide the Town a
replacement guarantee that is found acceptable by legal counsel
7
Town of Newburgh
Solar Ordinance
July 12, 2023
for the Town within ninety (90) days, or the owner's or
operator's permit to operate the system shall be revoked. The
owner or operator shall be responsible for paying the Town's
legal fees.
4. If the owner or operator of the solar energy system fails to
remove the installation within 150 days of abandonment or the
proposed date of decommissioning, the Town of Newburgh or
the obligee retains the right to use all available means to cause
an abandoned, hazardous, or decommissioned medium scale
ground-mounted solar energy system to be removed.
5. If an owner or operator successfully removes a medium scale
solar energy system in accordance with requirements of this
Section, and the Town's Code Enforcement finds that the removal
was successfully completed, the owner or operator may apply to
the Planning Board for the release of the performance guarantee
identified in this Section. The Town shall not unreasonably
withhold the release of a performance guarantee post a
determination by the Code Enforcement Officer that an owner or
operator has successfully removed a solar energy system.
viii. Operations and Maintenance Plan:
1. The project proponent shall submit a plan for the operation and
maintenance of the medium scale ground-mounted solar energy
system, which shall include measures for maintaining safe access
to the installation as well as other general procedures for
operational maintenance of the installation.
ix. Signage:
1. A sign shall be required to identify the owner and provide a 24-
hour emergency contact phone number.
x. Emergency Services:
1. The medium-scale ground-mounted solar energy system owner
or operator shall provide a copy of the project summary electrical
schematic, and site plan to the Planning Board.
2. Upon request, the owner or operator shall cooperate with
Public Safety in developing an emergency response plan.
8
Town of Newburgh
Solar Ordinance
July 12, 2023
3. All means of shutting down the system shall be clearly marked.
4. The owner or operator shall provide to the Planning Board the
name and contact information of a responsible person for
public inquiries throughout the life of the installation.
7. Site Plan Application and Review
Please refer to the Town of Newburgh Zoning Ordinance in Article 4.
a) Applicability:
i. Roof-mounted systems are not subject to Site Plan Review.
ii. Small-Scale ground-mounted solar energy systems are subject to Minor
Site Plan Review.
iii. Medium-Scale ground-mounted solar energy systems are subject to Major
Site Plan Review.
b) In addition to the Town of Newburgh's site plan application requirements in Article 4, the
Applicant shall submit the following supplemental information as part of a site plan
application:
i. A site plan showing:
1. Property lines and physical features, including roads, for the
project site;
2. Proposed changes to the landscape of the site, grading, vegetation
clearing and planting, exterior lighting, screening vegetation or
structures;
3. Blueprints or drawings of the solar energy system showing the
proposed layout of the system, any potential shading from nearby
structures, the distance between the proposed solar collector and all
property lines and existing on-site buildings and structures, and the
tallest finished height of the solar collector;
4. Documentation of the major system components to be used,
including the panels, mounting systems, and inverter(s);
5. Name, address, and contact information of the proposed system
installer, the project proponent, project proponent agent, and all co
proponents or property owners, if any; and
9
Town of Newburgh
Solar Ordinance
July 12, 2023
6. A one-or three-line electrical diagram detailing the solar
photovoltaic installation, associated components, and electrical
interconnection methods.
7. Locations of important plant and animal habitats identified by the
Maine Department of Inland Fisheries and Wildlife or Town of
Newburgh, or rare and irreplaceable natural areas, such as rare and
exemplary natural communities and rare plant habitat as identified
by the Maine Natural Areas Program.
8. Locations of wetlands and waterbodies.
9. Location of floodplains.
10. Locations of local or National or Historic Districts.
11. A public outreach plan, including how the project proponent will
inform abutters and the community.
12. A removal plan with a performance guarantee (Refer to Section
7.g. in this ordinance)
13. An Operations and Maintenance Plan
8. Review Procedure and Process
Please refer to Article 4 in the Town of Newburgh's Zoning Ordinance for the
Town's review process and approval standards.
9. Fees.
The Town may adopt administrative fees and technical review fees for site plan review.
Refer to Town's Fees Ordinance Article 4.3.
10. Legal Action and Violations
a) When any violation of any provision of this ordinance shall be found to exist, the Code
Enforcement Officer is hereby authorized and directed to institute all actions and proceedings,
either legal or equitable, that may be appropriate or necessary to enforce the provisions of this
Ordinance in the name of the Town of Newburgh. This Section shall not prevent any person
entitled to equitable relief from enjoining any act contrary to the provisions of this ordinance.
b) Any person, firm, or corporation, being the owner of, or having control of, or the use
of any building or land or part thereof, who violates any of the provisions of this ordinance shall
by guilty of a civil violation and upon conviction thereof shall be fined in accordance with the
following:
10
Town of Newburgh
Solar Ordinance
July 12, 2023
i) The minimum penalty for starting construction or undertaking a land use
activity without a required permit penalty shall be one hundred dollars ($100.00), and the
maximum penalty shall be two thousand five hundred dollars ($2500.00).
ii) The minimum penalty for a specific violation shall be one hundred dollars
($100.00), and the maximum penalty shall be two thousand five hundred dollars ($2500.00).
c) All civil penalties imposed shall ensure to the benefit of the Town of Newburgh. Each
day any violation that continues to exist after notification shall constitute a separate
offense.
11