This is the exact embedded text of the captured official document.
Snapshot 8df4405fbdab · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
FLOODPLAIN MANAGEMENT
ORDINANCE FOR THE
TOWN OF NEWPORT, MAINE
FLOODPLAIN MANAGEMENT ORDINANCE
CONTENTS
ARTICLE PAGE
IV. APPLICATION FEE AND EXPERT'S FEE..............ccsceeeeeeeeteeeeeee 4
V. REVIEW STANDARDS FOR FLOOD HAZART DEVELOPMENT
VIL. CERTIFICATE OF COMPLIANCE............::cecseseserseecsctceceeseecees 10
VIII. REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS...11
XI. VALIDITY AND SEVERABILITY...........cceecccceeeeeeeeeeeeeeseeeaeeeeee 14
XII. CONFLICT WITH OTHER ORDINANCES...........:.:ccceceeeeeeeeeeerees 14
ARTICLE I-PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Newport, Maine are subject to periodic flooding, causing serious
damages to properties within these areas. Relief is available in the form of flood insurance as
authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of Newport, Maine has chosen to become a participating community in
the National Flood Insurance Program, and agrees to comply with the requirements of the
National Flood Insurance Acts of 1968 (P.L. 90-488, as amended) as delineated in this
Floodplain Management Ordinance.
It is the intent of the Town of Newport, Maine to require the recognition and evaluation of
flood hazards in all official actions relating to land use in the floodplain areas having special
flood hazards.
The Town of Newport has the legal authority to adopt land use and control measures to
reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352 and
4401-4407.
The National Flood Insurance Program, established in the aforesaid Act, provides that areas of
the Town of Newport having a special flood hazard be identified by the Federal Emergency
Management Agency and that floodplain management measures be applied in such flood
hazard areas. This Ordinance establishes a Flood Hazard Development Permit system and
review procedure for development activities in the designated flood hazard areas of the Town
of Newport, Maine.
The areas of special flood hazard, are identified by the Federal Emergency Management
Agency in a map entitled "Flood Insurance Rate Map-Town of Newport, Maine, Penobscot
County," dated September 18, 1985, which is hereby adopted by reference and declared to be
a part of this Ordinance.
ARTICLE I-PERMIT REQUIRED
Before any construction or other development (as defined in Article XIII), including the
placement of manufactured homes, begins within any areas of special flood hazard established
in Article I, a Flood Hazard Development Permit shall be obtained from the Code
Enforcement Officer. This permit shall be in addition to any other permits, which may be
required pursuant to the codes and ordinances of the Town of Newport, Maine.
ARTICLE II-APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted to the Code
Enforcement Officer and shall include:
A. The name, address and phone number of the applicant, owner, and contractor;
B. An address and a map indicating the location of the construction site;
C. A site plan showing location of existing and/or proposed development, including but not
limited to structures, sewage disposal facilities, water supply facilities, areas to be cut and
filled, and lot dimensions;
D. A statement of the intended use of the structure and/or development;
E. A statement of the cost of the development including all materials and labor;
F. A statement as to the type of sewage system proposed;
G. Specification of dimensions of the proposed structure and/or development;
[Items H-K.2. apply only to new construction and substantial improvements. ]
H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), or to a
locally established datum, of the:
1. base flood at the proposed site of all new or substantially improved structures, which
in Zone A is determined:
a. from any base flood elevation data from federal, state, or other technical sources
(such as FEMA's Quick-2 model, FEMA 265/July 1995), including information
obtained pursuant to Article VI.J. and VIII.D.;
b. from the contour elevation extrapolated from a best fit analysis of the floodplain
boundary when overlaid onto a USGS Quadrangle Map or other topographic map
prepared by a Professional Land Surveyor or registered professional engineer, if
the floodplain boundary has a significant correlation to the elevation contour
line(s); or, in the absence of all other data.
c. to be the elevation of the ground at the intersection of the floodplain boundary and
a line perpendicular to the shoreline which passes along the ground through the
site of the proposed building.
I. A description of an elevation reference point established on the site of all developments
for which elevation standards apply as required in Article VI;
J. A written certification by a Professional Land Surveyor, registered professional engineer
or architect, that the base flood elevation and grade elevations shown on the application
are accurate;
K. The following certifications as required in Article VI by a registered professional
engineer or architect:
1. aFloodproofing Certificate (FEMA Form 81-65, 08/99, as amended), to verify that
the floodproofing methods for any non-residential structures will meet the
floodproofing criteria of Article III.H.4.; Article VI.G.; and other applicable standards
in Article VI;
2. a Hydraulic Openings Certificate to verify that engineered hydraulic openings in
foundation walls will meet the standards of Article VI.K.2.a.;
3. acertified statement that bridges will meet the standards of Article VI.L.;
4. acertified statement that containment walls will meet the standards of Article VI.M.;
L. A description of the extent to which any water course will be altered or relocated as a
result of the proposed development; and,
M. A statement of construction plans describing in detail how each applicable development
standard in Article VI will be met.
ARTICLE IV-APPLICATION FEE AND EXPERT'S FEE
A non-refundable application fee of $30.00 shall be paid to the Town Clerk and a copy of a
receipt for the same shall accompany the application.
An additional fee may be charged if the Code Enforcement Officer and/or Board of Appeals
needs the assistance of a professional engineer or other expert. The expert's fee shall be paid
in full by the applicant within 10 days after the town submits a bill to the applicant. Failure to
pay the bill shall constitute a violation of the ordinance and be grounds for the issuance of a
stop work order. An expert shall not be hired by the municipality at the expense of an
applicant until the applicant has either consented to such hiring in writing or been given an
opportunity to be heard on the subject. An applicant who is dissatisfied with a decision to hire
expert assistance may appeal that decision to the Board of Appeals.
ARTICLE V-REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT
PERMIT APPLICATIONS
The Code Enforcement Officer shall:
A. Review all applications for the Flood Hazard Development Permit to assure that proposed
developments are reasonably safe from flooding and to determine that all pertinent
requirements of Article VI (Development Standards) have been, or will be met;
a,
B. Utilize, in the review of al Flood Hazard Development Permit applications:
1. the base flood date contained in the "Flood Insurance Rate Map-Town of Newport,
Maine," as described in Article I;
2. in special flood hazard areas where base flood elevation data are not provided, the
Code Enforcement Officer shall obtain, review and reasonably utilize any base flood
elevation and floodway data from federal, state, or other technical sources, including
information obtained pursuant to Article II.H.1.; Article VI.J.; and Article VIII.D., in
order to administer Article VI of this Ordinance; and,
3. when the community establishes a base flood elevation in a Zone A by methods
outlined in Article III.H.1., the community shall submit that data to the Maine
Floodplain Management Program in the State Planning Office.
C. Make interpretations of the location of boundaries of special flood hazard areas shown on
the maps described in Article I of this Ordinance;
D. In the review of Flood Hazard Development Permit applications, determine that al
necessary permits have been obtained from those federal, state, and local government
agencies from which prior approval is required by federal or state law, including but not
limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972,
33 U.S.C. 1344;
E. Notify adjacent municipalities, the Department of Environmental Protection, and the
Maine Floodplain Management Program in the State Planning Office prior to any
alteration or relocation of a water course and submit copies of such notifications to the
Federal Emergency Management Agency;
F. Ifthe application satisfies the requirements of this Ordinance, approve the issuance of one
of the following Flood Hazard Development Permits based on the type of development:
1. A two part Flood Hazard Development Permit for elevated structures. Part I shall
authorize the applicant to build a structure to and including the first horizontal floor
only above the base flood level. At that time the applicant shall provide the Code
Enforcement Officer with an Elevation Certificate completed by a Professional Land
Surveyor, registered professional engineer or architect based on the Part I permit
construction, "as built", for verifying compliance with the elevation requirements of
Article VI, paragraphs F, G, or H. Following review of the Elevation Certificate data,
which shall take place within 72 hours of receipt of the application, the Code
Enforcement Officer shall issue Part II of the Flood Hazard Development Permit. Part
II shall authorize the applicant to complete the construction project; or,
2. A Flood Hazard Development Permit for Floodproofing of Non-Residential
Structures that are new construction or substantially improved non-residential
structures that are not being elevated but that meet the floodproofing standards of
Article VI.G.1.,2., and 3. The application for this permit shall include a Floodproofing
Certificate signed by a registered professional engineer or architect; or,
5,
3. A Flood Hazard Development Permit for Minor Development for all development
that is not new construction or a substantial improvement, such as repairs,
maintenance, renovations, or additions, whose value is less than 50% of the market
value of the structure. Minor development also includes, but is not limited to:
accessory structures as provided for in Article VI.I., mining, dredging, filling,
grading, paving, excavation, drilling operations, storage of equipment or materials,
deposition or extraction of materials, public or private sewage disposal systems or
water supply facilities that do not involve structures; and non-structural projects such
as bridges, dams, towers, fencing, pipelines, wharves and piers.
G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit
Applications, corresponding Permits issued, and data relevant thereto, including reports
of the Board of Appeals on variances granted under the provisions of Article [X of this
Ordinance, and copies of Elevation Certificates, Floodproofing Certificates, Certificates
of Compliance and certifications of design standards required under the provisions of
Articles HI, VI, and VII of this Ordinance.
ARTICLE VI-DEVELOPMENT STANDARDS
All development in areas of special flood hazard shall meet the following applicable
standards:
A. All Development-All development shall:
1. be designed or modified and adequately anchored to prevent flotation (excluding piers
and docks), collapse or lateral movement of the development resulting from
hydrodynamic and hydrostatic loads, including the effects of buoyancy;
2. use construction materials that are resistant to flood damage;
3. use construction methods and practices that will minimize flood damage; and
4. use electrical, heating, ventilation, plumbing, and air conditioning equipment, and
other service facilities that are designed and/or located so as to prevent water from
entering or accumulating within the components during flooding conditions.
B. Water Supply-All new and replacement water supply systems shall be designed to
minimize or eliminate infiltration of flood waters into the systems.
C. Sanitary Sewage Systems-All new and replacement sanitary sewage systems shall be
designed and located to minimize or eliminate infiltration of flood waters into the system
and discharges from the system into flood waters.
D. On Site Waste Disposal Systems-On site waste disposal systems shall be located and
constructed to avoid impairment to them or contamination from them during floods.
lo.
E. Watercourse Carrying Capacity-All development associated with altered or relocated
portions of a watercourse shall be constructed and maintained in such a manner that no
reduction occurs in the flood carrying capacity of the watercourse.
F. Residential-New construction or substantial improvement of any residential structure
located within Zone A shall have the lowest floor (including basement) elevated to at
least one foot above the base flood elevation utilizing information obtained pursuant to
Article III.H.1.; Article V.B; or Article VII.D.
G. Non-Residential-New construction or substantial improvement of any non-residential
structure located within Zone A shall have the lowest floor (including basement) elevated
to at least one foot above the base flood elevation utilizing information obtained pursuant
to Article III.H.1.; Article V.B; or Article VIII.D.; or together with attendant utility and
sanitary facilities shall:
1. be floodproofed to at least one foot above the base flood elevation utilizing
information obtained pursuant to Article III.H.1.; Article V.B; or Article VIII.D.; so
that below that elevation the structure is watertight with walls substantially
impermeable to the passage of water;
2. have structural components capable of resisting hydrostatic and hydrodynamic loads
and the effects of buoyancy; and,
3. be certified by a registered professional engineer or architect that the floodproofing
design and methods of construction are in accordance with accepted standards of
practice for meeting the provisions of this section. Such certification shall be provided
with the application for a Flood Hazard Development Permit, as required by Article
IILK. and shall include a record of the elevation above mean sea level to which the
structure is floodproofed.
H. Manufactured Homes-New or substantially improved manufactured homes located
within Zone A shall:
1. be elevated such that the lowest floor (including basement) of the manufactured home
is at least one foot above the base flood elevation utilizing information obtained
pursuant to Article III.H.1.; Article V.B; or Article VIILD.;
2. be ona permanent foundation, which may be poured masonry slab or foundation
walls, with hydraulic openings, or may be reinforced piers or block supports, any of
which support the manufactured home so that no weight is supported by its wheels
and axles; and,
3. be securely anchored to an adequately anchored foundation system to resist flotation,
collapse, or lateral movement. Methods of anchoring may include, but are not limited
to:
wh
a. over-the-top ties anchored to the ground at the four corners of the manufactured
home, plus two additional ties per side at intermediate points (manufactured homes
less than 50 feet long require one additional tie per side); or by,
b. frame ties at each corner of the home, plus five additional ties along each side at
intermediate points (manufactured homes less than 50 feet long require four
additional ties per side).
c. all components of the anchoring system described in Article VI.H.3.a. & b. shall
be capable of carrying a force of 4800 pounds.
I. Accessory Structures-Accessory Structures, as defined in Article XIII, located with
Zone A, shall be exempt from the elevation criteria required in Article VIF. & G. above,
if all other requirements of Article VI and all the following requirements are met.
Accessory Structures shall:
1. be 500 square feet or less and have a value less than $3000;
2. have unfinished interiors and not be used for human habitation;
3. have hydraulic openings, as specified in Article VI.K.2., in at least two different walls
of the accessory structure;
4. be located outside the floodway;
5. when possible be constructed and placed on the building site so as to offer the
minimum resistance to the flow of floodwaters and be placed further from the source
of flooding than is the primary structure; and,
6. have only ground fault interrupt electrical outlets. The electric service disconnect shall
be located above the base flood elevation and when possible outside the Special Flood
Hazard Area.
J. Floodways-Encroachments, including fill, new construction, substantial improvement,
and other development shall not be permitted in a floodway which, in Zone A riverine
areas, is the channel of the river or other water course and the adjacent land areas to a
distance of one-half the width of the floodplain as measured from the normal high water
mark to the upland limit of the floodplain, unless a technical evaluation certified by a
registered professional engineer is provided demonstrating that the cumulative effect of
the proposed development, when combined with all other existing development and
anticipated development:
1. will not increase the water surface elevation of the base flood more than one foot at
any point within the community; and,
%.
2. is consistent with the technical criteria contained in Chapter 5 entitled "Hydraulic
Analyses," Flood Insurance Study-Guidelines and Specifications for Study
Contractors, (FEMA 37/January 1995, as amended).
K. Enclosed Areas Below the Lowest Floor-New construction or substantial improvement
of any structure in Zone A that meets the development standards of Article VI, including
the elevation requirements of Article VI, paragraphs F, G, or H and is elevated on posts,
columns, piers, piles, "stilts." or crawlspaces may be enclosed below the base flood
elevation requirements provided all the following criteria are met or exceeded:
1. Enclosed areas are not "basements" as defined in Article XIII;
2. Enclosed areas shall be designed to automatically equalize hydrostatic flood forces on
exterior walls by allowing for the entry and exit of floodwater. Designs for meeting
this requirement must either:
a. be engineered and certified by a registered professional engineer or architect; or,
b. meet or exceed the following minimum criteria:
(1) a minimum of two openings having a total net area of not less than one square
inch for every square foot of the enclosed area;
(2) the bottom of all openings shall be below the base flood elevation and no
higher than one foot above the lowest grade; and,
(3) openings may be equipped with screens, louvers, valves, or other coverings or
devices provided that they permit the entry and exit of flood waters
automatically without any external influence or control such as human
intervention, including the use of electrical and other non-automatic
mechanical means;
3. The enclosed area shall not be used for human habitation; and,
4. The enclosed areas are usable solely for building access, parking of vehicles, or
storage.
L. Bridges-New construction or substantial improvement of any bridge in Zone A shall be
designed such that:
1. when possible, the lowest horizontal member (excluding the pilings, or columns) is
elevated to at least one foot above the base flood elevation utilizing information
obtained pursuant to Article III.H.1.; Article V.B; or Article VIII.D.; and
2. aregistered professional engineer shall certify that:
a. the structural design and methods of construction shall meet the elevation
requirements of this section and the floodway standards of Article VI.J.; and
q.
b. the foundation and superstructure attached thereto are designed to resist flotation,
collapse and lateral movement due to the effects of wind and water loads acting
simultaneously on all structural components. Water loading values used shall be
those associated with the base flood.
M. Containment Walls-New construction or substantial improvement of any containment
wall located within Zone A shall:
1. have the containment wall elevated to at least one foot above the base flood elevation
utilizing information obtained pursuant to Article III.H.1.; Article V.B.; or Article
VIILD.
2. have structural components capable of resisting hydrostatic and hydrodynamic loads
in the effects of buoyancy; and
3. be certified by a registered professional engineer or architect that the design and
methods of construction are in accordance with accepted standards of practice for
meeting the provisions of this section. Such certification shall be provided with the
application for a Flood Hazard Development Permit, as required by Article III.K.
N. Wharves, Piers and Docks-New construction or substantial improvement of wharves,
piers, and docks are permitted in Zone A in and over water and seaward of the mean high
tide if the following requirements are met:
1. wharves, piers, and docks shall comply with all applicable local, state, and federal
regulations; and
2. for commercial wharves, piers, and docks, a registered professional engineer shall
develop or review the structural design, specifications, and plans for the construction.
ARTICLE VII-CERIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which is
constructed or substantially improved shall be occupied until a Certificate of Compliance is
issued by the Code Enforcement Officer subject to the following provisions:
A. For New Construction or Substantial Improvement of any elevated structure the applicant
shall submit to the Code Enforcement Officer, an Elevation Certificate completed by a
Professional Land Surveyor, registered professional engineer, or architect, for compliance
with Article VI, paragraphs F, G, or H.
B. The applicant shall submit written notification to the Code Enforcement Officer that the
development is complete and complies with the provisions of this ordinance.
ic.
C. Within 10 working days, the Code Enforcement Officer shall:
1. review the Elevation Certificate and the applicant's written notification; and,
2. upon determination that the development conforms with the provisions of this
ordinance, shall issue a Certificate of Compliance.
ARTICLE VIII-REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed developments
that require review under other federal law, state law or local ordinances or regulations and all
projects on 5 or more disturbed acres, or in the case of manufactured home parks divided into
two or more lots, assure that:
A. All such proposals are consistent with the need to minimize flood damage.
B. All public utilities and facilities, such as sewer, gas, electrical and water systems are
located and constructed to minimize or eliminate flood damages.
C. Adequate drainage is provided so as to reduce exposure to flood hazards.
D. All proposals include base flood elevations, flood boundaries, and, in a riverine
floodplain, floodway data. These determinations shall be based on engineering practices
recognized by the Federal Emergency Management Agency.
E. Any proposed development plan must include a condition of plan approval requiring that
structures on any lot in the development having any portion of its land within a Special
Flood Hazard Area, are to be constructed in accordance with Article VI of this ordinance.
Such requirement will be included in any deed, lease, purchase and sale agreement, or
document transferring or expressing an intent to transfer any interest in real estate or
structure, including but not limited to a time-share interest. The condition shall clearly
articulate that the municipality may enforce any violation of the construction requirement
and that fact shall also be included in the deed or any other document previously
described. The construction requirement shall also be clearly stated on any map, plat, or
plan to be signed by the Planning Board or local reviewing authority as part of the
approval process.
ARTICLE IX-APPEALS AND VARIANCES
The Board of Appeals of the Town of Newport may, upon written application of an aggrieved
party, hear and decide appeals where it is alleged that there is an error in any order,
requirement, decision, or determination made by, or failure to act by, the Code Enforcement
Officer or Planning Board in the administration or enforcement of the provisions of this
Ordinance.
tl,
The Board of Appeals may grant a variance from the requirements of this Ordinance
consistent with state law and the following criteria:
A. Variances shall not be granted within any designated regulatory floodway if any increase
in flood levels during the base flood discharge would result.
B. Variances shall be granted only upon:
1. ashowing of good and sufficient cause; and,
2. adetermination that should a flood comparable to the base flood occur, the granting
of a variance will not result in increased flood heights, additional threats to public
safety, public expense, or create nuisances, cause fraud or victimization of the public
or conflict with existing local news or ordinances; and,
3. ashowing that the issuance of the variance will not conflict with other state, federal or
local laws or ordinances; and,
4. a determination that failure to grant the variance would result in "undue hardship,"
which in this sub-section means:
a. that the land in question cannot yield a reasonable return unless a variance is
granted; and,
b. that the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood; and,
c. that the granting of a variance will not alter the essential character of the locality;
and,
d. that the hardship is not the result of action taken by the applicant or a prior owner.
C. Variances shall only be issued upon a determination that the variance is the minimum
necessary, considering the flood hazard, to afford relief, and the Board of Appeals may
impose such conditions to a variance as it deems necessary.
D. Variances may be issued for new construction, substantial improvements, or other
development for the conduct of a functionally dependent use provided that:
1. other criteria of Article [X and Article VI.J. are met; and,
2. the structure or other development is protected by methods that minimize flood
damages during the base flood and create no additional threats to public safety.
E. Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of
Historic Structures upon the determination that:
1. the development meets the criteria of Article IX, paragraphs A. through D. above;
and,
2. the proposed repair, reconstruction, rehabilitation, or restoration will not preclude the
structure's continued designation as a Historic Structure and the variance is the
minimum necessary to preserve the historic character and design of the structure.
ee
F. Any applicant who meets the criteria of Article IX, paragraphs A. through E. shall be
notified by the Board of Appeals in writing over the signature of the Chairman of the
Board of Appeals that:
1. the issuance of a variance to construct a structure below the base flood level will
result in greatly increased premium rates for flood insurance up to amounts as high as
$25 per $100 of insurance coverage;
2. such construction below the base flood level increase risks to life and property; and,
3. the applicant agrees in writing that the applicant is fully aware of all the risks inherent
in the use of land subject to flooding, assumes those risks and agrees to indemnify and
defend the municipality against any claims filed against it that are related to the
applicant's decision to use land located in a floodplain and that the applicant
individually releases the municipality from any claims the applicant may have against
the municipality that are related to the use of land located in a floodplain.
G. Appeal Procedure for Administrative and Variance Appeals
1. An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party within thirty days after receipt of a written decision of the Code
Enforcement Officer or Planning Board.
2. Upon being notified of an appeal, the Code Enforcement Officer or Planning Board,
as appropriate, shall transmit to the Board of Appeals all of the papers constituting the
record of the decision appealed from.
3. The Board of Appeals shall hold a public hearing on the appeal within thirty-five days
of its receipt of an appeal request.
4. The person filing the appeal shall have the burden of proof.
5. The Board of Appeals shall decide all appeals within thirty-five days after the close of
the hearing, and shall issue a written decision on all appeals.
6. The Board of Appeals shall submit to the Code Enforcement Officer a report of all
variance actions, including justification for the granting of the variance and an
authorization for the Code Enforcement Officer to issue a Flood Hazard Development
Permit, which includes any conditions to be attached to said permit.
7. Any aggrieved party who participated as a party during the proceedings before the
Board of Appeals may take an appeal to Superior Court in accordance with State laws
within forty-five days from the date of any decision of the Board of Appeals.
3.
ARTICLE X-ENFORCEMENT AND PENALTIES
A. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance pursuant to Title 30-A MRSA § 4452.
B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of this
Ordinance.
C. In addition to any other actions, the Code Enforcement Officer, upon determination that a
violation exists, shall submit a declaration to the Administrator of the Federal Insurance
Administration requesting a denial of flood insurance. The valid declaration shall consist
of;
1. the name of the property owner and address or legal description of the property
sufficient to confirm its identity or location;
2. aclear an unequivocal declaration that the property is in violation of a cited State or
local law, regulation, or ordinance;
3. aclear statement that the public body making the declaration has authority to do so
and a citation to that authority;
4. evidence that the property owner has been provided notice of the violation and the
prospective denial of insurance; and,
5. aclear statement that the declaration is being submitted pursuant to Section 1316 of
the National Flood Insurance Act of 1968, as amended.
ARTICLE XI-VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of this Ordinance.
ARTICLE XII-CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with any
other applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this
Ordinance imposes a greater restriction upon the use of land, buildings, or structures, the
provisions of this Ordinance shall control.
ARTICLE XIII-DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have the
same meaning as they have at common law and to give this Ordinance its most reasonable
application. Words used in the present tense include the future, the singular number includes
iH,
the plural, and the plural number included the singular. The word "may" is permissive; "shall"
is mandatory and not discretionary.
Accessory Structure-means a small detached structure that is incidental and subordinate to
the principal structure.
Adjacent Grade-means the natural elevation of the ground surface prior to construction next
to the proposed walls of a structure.
Area of Special Flood Hazard-means the land in the floodplain having a one percent or
greater chance of flooding in any given year, as specifically identified in the Flood Hazard
Boundary Map or Flood Insurance Rate Map cited in Article I of this Ordinance.
Base Flood-means the flood having a one percent chance of being equaled or exceeded in any
given year, commonly called the 100-year flood.
Basement-means any area of the building having its floor subgrade (below ground level) on
all sides.
Building-see Structure.
Certificate of Compliance-A document signed by the Code Enforcement Officer stating that
a structure is in compliance with all of the provisions of this Ordinance.
Code Enforcement Officer-any person or board responsible for performing the inspection,
licensing, and enforcement duties required by a particular statute or ordinance.
Development-means any change caused by individuals or entities to improved or unimproved
real estate, including but not limited to the construction of buildings or other structures; the
construction of additions or substantial improvements to buildings or other structures; mining,
dredging, filling, grading, paving, excavation, drilling operations or storage of equipment or
materials; and the storage, deposition, or extraction of materials, public or private sewage
disposal systems or water supply facilities.
Elevated Building-means a non-basement building
a. built, in the case of a building in Zone A, to have the top of the elevated floor, elevated
above the ground level by means of pilings, columns, post, piers, or "stilts;" and
b. Adequately anchored so as not to impair the structural integrity of the building during a
flood of up to one foot above the magnitude of the base flood.
In the case of Zone A, Elevated Building also includes a building elevated by means of fill or
solid foundation perimeter walls with hydraulic openings sufficient to facilitate the
unimpeded movement of flood waters, as required in Article VLK.
IS.
Elevation Certificate-An official form (FEMA Form 81-31, 07/00, as amended) that:
a. is used to verify compliance with the floodplain management regulations of the National
Flood Insurance Program; and,
b. is required for purchasing flood insurance.
Flood or Flooding-means:
a. A general and temporary condition of partial or complete inundation of normally dry land
areas from:
1. The overflow of inland or tidal waters.
2. The unusual and rapid accumulation or runoff of surface waters from any source.
b. The collapse or subsidence of land along the shore of a lake or other body of water as a
result of erosion or undermining caused by waves or currents of water exceeding
anticipated cyclical levels or suddenly caused by an unusually high water level in a natural
body of water, accompanied by a severe storm, or by an unanticipated force of nature,
such as flash flood or an abnormal tidal surge, or by some similarly unusual and
unforeseeable event which results in flooding as defined in paragraph a.1. of this
definition.
Flood Elevation Study-means an examination, evaluation and determination of flood hazards
and, if appropriate, corresponding water surface elevations.
Flood Hazard Boundary Map (FHBM)-means an official map of a community, issued by
the Federal Insurance Administration, where the boundaries of the base flood have been
designated.
Flood Insurance Rate Map (FIRM)-means an official map of a community, on which the
Federal Insurance Administrator has delineated both the special hazard areas and the risk
premium zones applicable to the community.
Floodplain or Flood-prone Area-means any land area susceptible to being inundated by
water from any source (see flooding).
Floodplain Management-means the operation of an overall program of corrective and
preventive measures for reducing flood damage, including but not limited to emergency
preparedness plans, flood control works, and floodplain management regulations.
Floodplain Management Regulations-means zoning ordinances, subdivision regulations,
building codes, health regulations, special purpose ordinances (such as a floodplain ordinance,
grading ordinance, and erosion control ordinance) and other applications of police power. The
term describes such state or local regulations, in any combination thereof, which provide
standards for the purpose of flood damage prevention and reduction.
Ilo.
Floodproofing-means any combination of structural and non-structural additions, changes, or
adjustments to structures, which reduce or eliminate flood damage to real estate or improved
real property, water and sanitary facilities, structures and contents.
Floodway-sce Regulatory Floodway.
Freeboard-means a factor of safety usually expressed in feet above a flood level for purposes
of floodplain management. Freeboard tends to compensate for the many unknown factors,
such as wave action, bridge openings, and the hydrological effect of urbanization of the
watershed, that could contribute to flood heights greater than the height calculated for a
selected size flood and floodway conditions.
Functionally Dependent Use-means a use, which cannot perform its intended purpose unless
it is located or carried out in close proximity to water. The term includes only docking
facilities, port facilities that are necessary for the loading and unloading of cargo or
passengers, and ship building and ship repair facilities, but does not include long-term storage
or related manufacturing facilities.
Historic Structure-means any structure that is:
a. Listed individually in the National Register of Historic Places (a listing maintained by the
Department of Interior) or preliminarily determined by the Secretary of the Interior as
meeting the requirements for individual listings on the National Register;
b. Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic district or a district preliminarily determined
by the Secretary of the Interior to qualify as a registered historic district;
c. Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior; or
d. Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified either:
1. By an approved state program as determined by the Secretary of the Interior, or
2. Directly by the Secretary of the Interior in states without approved programs.
Locally Established Datum-means, for purposes of this ordinance, an elevation established
for a specific site to which all other elevations at the site are referenced. This elevation is
generally not referenced to the National Geodetic Vertical Datum (NGVD) or any other
established datum and is used in areas where Mean Sea Level data is too far from a specific
site to be practically used.
mae
Lowest Floor-means the lowest floor of the lowest enclosed area (including basement). An
unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access
or storage in an area other than a basement area is not considered a building's lowest floor,
provided that such enclosure is not built so as to render the structure in violation of the
applicable non-elevation design requirements described in Article VI.K. of this ordinance.
Manufactured Home-means a structure, transportable in one or more sections, which is built
on a permanent chassis and is designed for use with or without a permanent foundation when
connected to the required utilities. For floodplain management purposes the term
manufactured home also includes park trailers, travel trailers, and other similar vehicles
placed on a site for greater than 180 consecutive days.
Manufactured Home Park or Subdivision-means a parcel (or contiguous parcels) of land
divided into two or more manufactured home lots for rent or sale.
Mean Sea Level-means, for purposes of the National Flood Insurance Program, the National
Geodetic Vertical Datum (NGVD) of 1929, or other datum, to which base flood elevations
shown on a community's Flood Insurance Rate map are referenced.
Minor Development-means all development that is not new construction or a substantial
improvement, such as repairs, maintenance, renovations, or additions, whose value is less than
50% of the market value of the structure. It also includes, but is not limited to: accessory
structures as provided for in Article VI.I., mining, dredging, filling, grading, paving,
excavation, drilling operations, storage of equipment or materials, deposition or extraction of
materials, public or private sewage disposal systems or water supply facilities that do not
involve structures; and non-structural projects such as bridges, dams, towers, fencing,
pipelines, wharves and piers.
National Geodetic Vertical Datum (NGVD)-means the national vertical datum, whose
standard was established in 1929, which is used by the National Flood Insurance Program
(NFIP). NGVD was based upon mean sea level in 1929 and also has been called "1929 Mean
Sea Level (MSL)".
New Construction-means structures for which the "start of construction" commenced on or
after the effective date of the initial floodplain management regulations adopted by a
community and included any subsequent improvements to such structures.
100-year flood-see Base Flood.
Regulatory Floodway-
a. means the channel of a river or other water course and the adjacent land areas that must be
reserved in order to discharge the base flood without cumulatively increasing the water
surface elevation more than one foot, and
io.
b. in Zone A riverine areas, the floodway is considered to be the channel of a river or other
watercourse and the adjacent land areas to a distance of one-half the width of the
floodplain, as measured from the normal high water mark to the upland limit of the
floodplain.
Riverine-means relating to, formed by, or resembling a river (including tributaries), stream,
brook, etc.
Special Flood Hazard Area-see Area of Special Flood Hazard.
Start of Construction-means the date the building permit was issued, provided the actual
start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial
improvement or other improvement was within 180 days of the permit date. The actual start
means either the first placement of permanent construction of a structure on a site, such as the
pouring of slab or footings, the installation of piles, the construction of columns, or any work
beyond the stage of excavation; or the placement of a manufactured home on a foundation.
Permanent construction does not include land preparation, such as clearing, grading and
filling; nor does it include the installation of streets and/or walkways; nor does it include
excavation for basement, footings, piers, or foundations or the erection of temporary forms;
nor does it include the installation on the property of accessory buildings, such as garages or
sheds not occupied as dwelling units or not part of the main structure. For a substantial
improvement, the actual start of construction means the first alteration of any wall, ceiling,
floor, or other structural part of a building, or modification of any construction element,
whether or not that alteration affects the external dimensions of the building.
Structure-means, for floodplain management purposes, a walled and roofed building. A gas
or liquid storage tank that is principally above ground is also a structure.
Substantial Damage-means, damage of any origin sustained by a structure whereby the cost
of restoring the structure to its before damage condition would equal or exceed 50 percent of
the market value of the structure before the damage occurred.
Substantial Improvement-means any reconstruction, rehabilitation, addition, or other
improvement of a structure, the cost of which equals or exceeds 50 percent of the market
value of the structure before the start of construction of the improvement. This term includes
structures which have incurred substantial damage, regardless of the actual repair work
performed. The term does not, however, include either:
a. Any project for improvement of a structure to correct existing violations of state or local
health, sanitary, or safety code specifications which have been identified by the local code
enforcement official and which are the minimum necessary to assure safe living
conditions; or
b. Any alteration of a Historic Structure provided that the alteration will not preclude the
structure's continued designation as a historic structure, and a variance is obtained from
the community's Board of Appeals.
19.
Variance-means a grant of relief by a community from the terms of a floodplain management
regulation.
Violation-means the failure of a structure or development to comply with a community's
floodplain management regulations.
ARTICLE XIV-ABROGATION
This ordinance repeals and replaces any municipal ordinance previously enacted to comply
with the National Flood Insurance Act of 1968 (P.L. 90-488, as amended).
60.3 (b)
I HEREBY CERTIFY THAT THIS IS A TRUE AND EXACT COPY OF THE FLOODPLAIN MANAGEMENT
ORDINANCE AS ADOPTED BY THE TOWN OF NEWPORT AT THE ANNUAL TOWN MEETING HELD ON
MARCH 6TH, 2004, ON FILE AT THE NEWPORT TOWN OFFICE.
MARCH 27, 2012
ZOs