This is the exact embedded text of the captured official document.
Snapshot 911719746a86 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
SUBDIVISION ORDINANCE
OF THE
TOWN OF NEWPORT
1
TABLE OF CONTENTS
ARTICLE 1-PURPOSE PG 3
ARTICLE 2-AUTHORITY & ADMINISTRATION PGS
ARTICLE 3-PROCEDURES FOR SUBDIVISION REVIEW PG 3
ARTICLE 4-IMPROVEMENT GUARANTEES PG 15
ARTICLE 5-GENERAL REQUIREMENTS & DESIGN STANDARDS PG 19
ARTICLE 6-WAIVER & MODIFICATION OF THESE REGULATIONS PG 27
ARTICLE 7-REPEAL OF PREVIOUS SUBDIVISION ORDINANCE PG 28
ARTICLE 8-AMENDMENTS PG 28
ARTICLE 9-APPEALS PG 28
ARTICLE 10-DEFINITIONS PG 28
2
ARTICLE 1- PURPOSE
The purpose of this Subdivision Ordinance shall be to assure the comfort, health, safety
and general welfare of the people to protect the environment, to provide for the orderly
development of a sound and stable community and to uphold the State Subdivision Law
(MRSA Title 30, Sec. 4956).
ARTICLE 2 -- AUTHORITY AND ADMINISTRATION
2.1 Authority
2.1.1 This ordinance is adopted pursuant to and consistent with Title 30, MRSA
Section 4956.
2.1.2 This ordinance shall be known and cited as the "Subdivision Ordinance of
the Town of Newport".
2.2 Administration
2.2.1 The Planning Board of the Town of Newport, with the assistance of the
Code Enforcement Officer and the Selectboard (as specified in the Ordinance)
shall administer this ordinance.
2.2.2 The provisions of this ordinance pertain to all land proposed for
subdivision, as herein defined, within the boundaries of the Town of Newport.
2.2.3 No person, firm, corporation or other legal entity may sell, lease, develop,
build upon or convey for consideration, offer or agree to sell, lease, develop, build
upon or convey for consideration any land in a subdivision in the Town of
Newport which has not been approved by the Planning Board of the Town of
Newport and recorded in the Penobscot County Registry of Deeds nor shall such
person, firm, corporation or other legal entity sell or convey any land in such
approved subdivision unless a permanent marker is set at all corners of the lot
sold or conveyed.
ARTICLE 3- PROCEDURES FOR SUBDIVISION REVIEW
3.1 Introduction- Whenever any subdivision of land is proposed in the Town of Newport,
the subdivider or his duly authorized agent shall apply in writing for approval of such
proposed subdivision in accordance with the procedures in Sec. 3.2, 3.3 and 3.4 of this
ordinance.
3.2 Pre-application meeting and submission of a sketch plan-
3
3.2.1 The subdivider shall submit seven copies of a sketch plan application to the
Planning Board either at or prior the meeting in which the proposal is scheduled
for discussion and the subdivider or his authorized agent shall be present at the
meeting to discuss the proposal with the Planning Board.
3.2.2 The purposes of this pre-application conference between the subdivider and
the Planning Board are:
1. To classify the subdivision as a major or a minor subdivsion;
2. To provide an opportunity for the subdivider and the Planning Board to
informally review the subdividers ideas for use of the land;
3. To discuss procedures for subdivision review and approval;
4. If road construction is involved in the proposal, the Planning Board
shall classify the road as either minor or collector;
5. To discuss any apparent potential problems associated with the
subdivision;
6. To arrange for on-site inspection of the subdivision site; and
7. In case of minor subdivisions (as defined) to vote whether to waive the
requirement for preliminary review.
3.2.3 The sketch plan shall consist of an outline of the proposed subdivision,
drawn on a map, showing the proposed layout of streets, lots, and other features in
relation to existing conditions. The sketch plan shall be a written application
which includes a description of existing covenants and easements and shoreland
zoning, medium intensity soils survey information; information about available
community facilities and utilities on or near the site; information describing the
subdivision proposal including the number of residential lots, typical lot width,
and depth, plans regarding sewer and water service and road construction, and any
proposed non-residential lots, typical lot width, and depth; plans regarding sewer
and water service and road construction, and any proposed non-residential areas.
3.2.4 Other than the classification of the subdivision and the roads (if necessary)
and the establishment of review procedures to be used, no binding commitments
shall be made between the subdivider and the Board at this stage.
3.2.5 The subdivider shall notify the Board Chair at least 7 days prior to the
meeting date in which he intends on bringing a sketch plan before the board. The
Planning Board shall act on the sketch plan within 45 days of the time of
submission of the sketch plan and shall notify the subdivider of its action, in
writing, within 15 days of its action.
4
3.2.6 Inspection of Site- In order for the Board to be more fully informed about
the site of the proposed subdivision, the subdivider shall arrange for an inspection
of the site with the Board or an inspection of the site with the Board or an
individual appointed by the Board to act as its representative for the inspection.
Unless the Board has voted a waiver of inspection, the pre-application phase of
the review process shall not be considered complete until such inspection has
been made.
3.3 Preliminary Plan Phase
3.3.1 Purpose- The purpose of Preliminary Plan Review is to give the Planning
Board an opportunity to review the subdivider's proposal while it is in the planning stage
and to make recommendations to the subdivider as seems appropriate based on date and
local laws and regulations. The intent is that all major issues relative to the design of the
subdivision will be identified and resolved prior to the submission of the final plan.
3.3.2 Procedure
3.3.2.1 Application: Within six months after the classification of the
sketch plan by the Planning Board, the subdivider shall submit an
application for the consideration of a Preliminary Plan. Failure to do so
may require re-submission of the sketch plan to the Planning Board for
reclassification. The Preliminary Plan shall substantially conform to the
layout shown on the sketch plan plus any recommendation made by the
Planning Board. If the subdivision is classified as a Preliminary Plan
requirement, all procedures in Section 3.3 may be by-passed in the
review process.
3.3.2.2 The application for approval of the Preliminary Plan shall be
accompanied by fee of $250.00 payable by check to the Town of Newport.
3.3.2.3 The subdivider or his duly authorized representative, shall attend
the meeting of the Planning Board to discuss the Preliminary Plan.
3.3.2.4 Ten copies of the application for the Preliminary Plan shall be
provide 15 days prior to the meeting date.
3.3.2.5 Public Hearing -- The Planning Board may hold a public hearing
on the Preliminary Plan. If it determines that a public hearing shall be
held, it shall be held within 30 days of the time of submission of the
preliminary plan. Said hearing shall be advertised in a newspaper of
general circulation in Newport at least two times, the date of the first
5
publication to be at least 7 days prior to the hearing. The purpose of the
public hearing shall be for the Planning Board to receive testimony from
the public relative to any municipal or state ordinance, standard, or
regulation which is applicable to the proposed subdivision and the
relationship of the subdivision to the ordinance, standard or regulation.
3.3.2.6 Within 30 days after the public hearing, or within 60 days of the
date of submission of the plan if no public hearing is held, the Planning
Board shall take action to give preliminary approval, with or without
modifications, or to disapprove such Preliminary Plan. The reasons for
approval, for any modification required, or the grounds for disapproval
shall be stated in the records of the Planning Board. Failure of the
Planning Board to act within the required time limit shall constitute
approval.
3.3.2.7 When granting approval to a Preliminary Plan, the Planning Board
shall state the conditions of such approval, if any, with respect to: ( 1 ) the
specific changes which it will require in the final plan; (2 ) the character
and extent of the required improvements for which waivers may have been
requested and which in its opinion may be waived without jeopardy to the
public health, safety and general welfare. The Planning Board shall notify
the subdivider, in writing, of its decision and any conditions and reasons
associated with it.
3.3.2.8 Approval of a Preliminary Plan shall not constitute approval of the
Final Plan but rather it shall be deemed an expression of approval of the
design submitted on the Preliminary Plan as a guide to the preparation of
the Final Plan. The Final Plan shall be submitted for approval of the
Planning Board and for recording upon fulfillment of the requirements of
these standards and the conditions of the preliminary approval, if any.
3.3.3 Submissions-Ten copies of the Preliminary Subdivision Plan shall be submitted. It
may be either printed or reproduced on paper. The Preliminary plan shall be not less that
8.5" by 11" and not more than 24" by 36". The plan shall be drawn to scale in which one
inch equals no more than 100 feet. The Preliminary Plan and supporting data shall
include the following information:
3.3.3.1 Information about the Applicant
Information to be Written information
on the Plan to accompany Plan
1. Name of owner Xx Xx
6
2. Name of applicant Xx x
(If not owner)
3. If applicant is a corporation, X
licensed to do business in Maine,
attach a copy of Secretary of
State's Registration certificate.
4. Name of applicant's authorized Xx
representative
5. Name, address and number of Xx xX
Registered Professional Engineer
or Land Surveyor who prepared
plan.
6. Address to which all xX
correspondence should be sent.
7. What interest does the applicant xX
have in the parcel to be
subdivided.
8. What interest does applicant xX Xx
have in any abutting property.
9. State whether preliminary Xx
plan covers entire contiguous
holdings or applicant or not.
3.3.3.2 Information about Parcel to be Subdivided
1. Location of property: Xx
Registry of Deeds Book and Page numbers,
Town tax map and lot numbers.
2. Map survey of parcel x
to be subdivided, certified
by a Registered Land
Surveyor tied to establish
reference points. (attach)
3. Acreage of parcel to xX
be subdivided
if
4. A soils report, identifying soil x
types and location of soil test
areas. Evidence of soil suitability
as per the Maine Plumbing Code
shall be presented if subsurface
sewage is proposed. There shall
be one soil test per lot if subsurface
sewage disposal is proposed.
5. Names of abutters of parcel to be Xx
subdivided, and any on the
opposite side of any road from
parcel to be subdivided.
6. Indicate the nature of any restrictive xX
covenants to be put on the deeds.
7. Shoreland Zoning if applicable xX xX
3.3.3.3 Information on Subdivision
1. Proposed Name Xx X
2. Number of lots, and their sizes. xX xX
3. Date, north point, graphic scale xX
map.
4. Proposed lot lines with approximate xX
dimensions and suggested locations
of buildings, subsurface sewage
disposal systems and wells.
5. Location of all parcels to be xX Xx
dedicated to the public use and the
conditions of the dedication.
6. A location map, showing the Xx
relation of the proposed subdivision
to adjacent properties and to the
general surrounding area. The
location map shall show all the
area within 2000 feet of any
8
property line of the proposed
subdivision.
7. Location and size of existing xX
watercourse, and other essential
existing physical features including
wetlands and flood plains.
8. Location and size of existing sewers x
and water mains, and culverts and
drain on the property.
9. Location, names and widths of X
existing and proposed streets,
highways, easements, building
setback lines, parks and open spaces.
10. Contour lines at an interval of not Xx
more than 5 feet in elevation, unless
otherwise specified by the Board.
All elevations shall be referred to USGS.
11. Typical cross-sections of proposed Xx
grading for roadways and sidewalks,
including materials to be used on
roadways and sidewalk.
12. Storm drainage plan indicating the 4
approximate location and size of
proposed lines and means of disposal
and the effect of the drainage on the
property.
13. The approximate location and size of xX
all proposed water and sewer lines,
valves, pump stations and hydrants.
Also connections to existing sewer
and sewage disposal shall be shown.
If the subdivision is to utilize the
facilities of the Newport Water District,
the subdivider shall provide a letter from
the superintendent of the appropriate
district saying he has reviewed the
preliminary plans and approves the design
as proposed or that he requires various
modifications of the plans.
9
14. Location of all other existing and xX
proposed utilities.
15. Location and type of landscaping Xx
including natural growth to be left in
place and nursery stock to be planted.
This information may be indicated on
a preliminary plan.
16. If the application covers only a part of Xx
the subdivider's entire holding, a map
of the entire tract, drawn at a scale of one
inch equals not more than 400 ft., showing
an outline of the plated area with its
proposed streets and an indication of the
probable future street system
in the remaining portion of the tract.
The part of the subdivider's holding
submitted shall be considered in light
of the entire holding.
17. If the preliminary application covers Xx Xx
more area that the final plan will cover,
a map showing the phasing of the entire
project, drawn at a scale of one-inch equals
not more than 400 ft., and indicating the
proposed timing of each phase.
18. Other reasonable information not indicated xX Xx
above, as specified by the Board.
3.4 Final Plan
3.4.1 Procedure
1. Within 6 months of the date of the Planning Board action on the
Preliminary Plan or, if the Preliminary Plan requirement has been waived,
with 6 months of the Planning Board's vote to waive a requirement, the
subdivider shall submit the final plan within the designated time period
may require resubmission of the Preliminary Plan if such was required or
of the sketch plan if the Preliminary Plan was not required. However, the
subdivider may submit a final plan for only part of the subdivision
approved in the Preliminary Plan. In that case, each successive phase shall
be submitted within two years of the preceding phase. The final plan shall
consist of two original transparencies, of the one or more maps or
10
drawings and ten copies of all items, including maps, drawing and written
information) necessary to complete the submission.
2. The application for approval of the Final Plan shall be accompanied a
fee for $10.00 per lot payable by check to the Town of Newport, Maine.
3. The subdivider, or his duly authorized representative, shall attend the
meeting of the Planning Board to discuss the Final Plan.
4. The time submission of the Final Plan shall be the date of the regular
monthly meeting of the Planning Board, at least fifteen days prior to
which the complete application, accompanied by the required fee, has
been filed with the Chairman of the Planning Board. The Planning Board
shall issue the subdivider a dated receipt for the Final Plan at the time for
submission of the Final Plan.
5. Within 30 days from the receipt of a Final Plan, the Planning Board
shall notify the subdivider in writing either that the application is a
complete application or, if the application is incomplete, the specific
additional material needed to make a complete application. After the
Planning Board has determined that a complete application had been filed,
it shall notify the subdivider and begin its full evaluation of the proposed
subdivision.
6. Prior to submitting the final plan, the subdivider of a major sub-division
involving construction of roads or the extension of the public water or
sewer systems shall file all improvement guarantees in accordance with
Article 4.
7. Public Hearing-The Board may vote to hold a public hearing on the
proposed subdivision. If so, such hearing shall be held within 30 days of
having received a complete final plan (as determined under section 3.4.5)
The Planning Board shall advertise the public hearing in the manner
described in Section 3.3.2.5 of this ordinance. The purpose of the public
hearing shall be for the Planning Board to receive testimony from the
public relative to any municipal or state ordinance, standard, or regulation
which is applicable to the proposed subdivision and the relationship of the
subdivision to the ordinance, standard, or regulation.
8. Review and Action on Final Plan-The Board shall, within 30 days of a
public hearing or within 60 days for having received a complete
application, if no public hearing is held; or within such other time limit as
may be mutually agreed to by the Board and the subdivider, review the
application and deny or grant approval of the proposed subdivision, or
grant approval on such terms and conditions as it may deem advisable to
satisfy the criteria cottoned in this ordinance and state law and to preserve
11
the public health safety and general welfare. In all instances, the burden of
proof shall be upon the subdivider. In issuing its decision, the Planning
Board shall make findings of fact establishing that the proposed
subdivision does or does not meet the provisions of these regulations and
State Subdivision Law.
9. Upon approval of the plan, at least a majority of the Board members
present and eligible to vote shall sign both transparencies. The date and
any conditions of approval shall be written in both transparencies. One
signed transparency shall be returned to the sub-divider for filing at the
Registry of Deeds and one signed transparency shall be retained by the
planning board. The Planning Board shall maintain a permanent record of
their action on the final plan.
10. No changes, erasures, modifications, or revision shall be made in any
subdivision plan after approval has been given by the Planning board and
endorsed, in writing on the plan, unless the plan is first re-submitted to the
Planning Board and the Board approves the modifications. In the event
that any such subdivision plan is recorded without complying with this
requirement, the same shall be considered null and void, and the Board
shall institute proceedings to have the Plan stricken from the records of the
Registry of Deeds.
11. The subdivider shall file a signed subdivision plan at the Penobscot
County Registry of Deeds within 90 days of the date of approval. Any
plan not filed with ninety days will be considered null and void unless the
particular circumstances of said subdivider or subdivision warrants the
Planning Board to grant an extension, which shall not exceed two
additional ninety-day periods. Within seven days of the filing of the
subdivision plan, the subdivider shall give the Chairman of the Planning
Board written notification of the date of the filing and the Registry of
Deeds file number assigned to the plan.
12. If the Planning Board fails to take action with 60 days of the time of
submission of a complete final plan, or within the mutually agreed to time,
as specified above, the subdivision plan shall be deemed disapproved.
13. Approval of a subdivision plan does not imply that any road in the
subdivision will be accepted by the town. A road can only be accepted as
a public way by the legislative body of the Town of Newport: Town
Meeting.
3.4.2 Submissions- The Final Plan shall be submitted in the appropriate number of
paper and transparent copies. The Final Plan shall not be less 8 and one half by
11" and not more than 24" by 36". The plan shall be drawn at a scale in which 1
12
inch equals no more than 100 feet and shall be oriented so the north direction is
the same on all sheets.
In addition to all items required on the Preliminary Plan unless otherwise
indicated by the Planning Board, the following items shall be required as part of
the Final Plan submission:
Information to be Written information
on the Plan to accompany Plan
1. Registered Land Surveyor or x
Engineer-The name, registration
number, seal and signature of the
land surveyor and/or engineer whom
prepared the plan. This information
shall be on all sheets including
cross section and profile sheets.
2. Street- The names and lines, Xx
lengths of all straight lines, the
deflection of angles, radii, length
of curves, and central angles of
all curves, and tangent distances
and bearing (shown on plan)
3. Street Profiles- Profiles of Xx
proposed new streets on sheets
separate from the plat, at a
horizontal scale of one inch
equals 40 feet; profiles of all
proposed sewers shall be shown
on street profiles, when
applicable, at the same scale. All
elevations shall refer to datum.
4. Street Cross Section-Cross section x
of 50 feet horizontal intervals of
proposed new streets on sheets
separate from the plat, plotted at a
scale of one inch equals 5 feet. All
elevations shall refer to USGA datum.
13
5. Sewer Profiles of sanitary sewer, if Xx
not shown on street profiles, on sheets
separate from the plat, at the same
scale indicated for street profiles.
6.Storm Drainage Plan- Indicating Xx
the location and size of the proposed
lines and their profiles and means of
disposal.
7. Open Spaces- The designation of Xx
all easements, areas reserved for or
dedicated to public use, and areas
reserved by the subdivider. If open
space or recreation land is to be
dedicated to the town, accompanying
the plan shall be written copies of any
documents of land dedication and a
letter from the town attorney that they
are satisfied with the legal sufficiency
of the documents conveying such
land dedication.
8. Lots-The location, bearing and length Xx
of every line, with all lots to be numbered
in accordance with the practice of the
Town of Newport.
9, Permanent Reference Monuments- The xX
location of the permanent monuments
and pins, set at all lot corners and identified
as existing or proposed.
10. Improvements Guarantee Accompanying x
the plan shall be a letter from the Selectboard
indicating that the form, amount and duration
of the improvement guarantee is sufficient and
that it has been filed with them.
11. Approval Space-Suitable space to record é 4
on the approved plat plan the date and
conditions of approval, if any. This space
shall be similar to the following example:
14
Approved: Town of Newport Planning Board
Chairman:
Date:
Conditions:
12. Accompanying Data-If public water Xx
is proposed, accompanying the final plan
shall be a letter from the Superintendent of
the Newport Water District stating the
conditions on which the district will supply
water and approving the size and locations
of mains, valves, and hydrants proposed.
If public sewer is proposed, accompanying
the final plan shall be a letter from the
Superintendent of the Newport Sanitary
District stating the conditions on which the
district will provide sewer service and
approving the design and construction plans
for the sewer. Also there shall be a letter
from the Fire Chief approving the design
and approving the design and contruction
plans for the sewer. Also there shall be a
letter from the Fire Chief approving the
number, size and location of hydrants proposed.
ARTICLE 4-[MPROVEMENT GUARANTEES
4.1 Improvement Guarantees Required- Before the submission of a Final Plan, the
subdivider in all major subdivisions involving the construction or reconstruction of roads
and/or storm drain system(s) and/or the extension of the public water supply system shall
provide the town with improvement guarantees, in form of one or more of the guarantee
options listed below in an amount that will cover at least 100% of the cost of completing
the improvements, should the subdivider fail to complete the required improvements or
fail to complete them satisfactorily in accordance with the approved final subdivision
plans.
15
4.2 Procedure- The subdivider shall file with the Selectboard a proposed
improvement guarantee and the Selectboard shall determine whether the form, amount
and the duration of the improvement guarantee are sufficient. In the event of Selectboard
refuse to approve the proposed improvement guarantee as filed by the subdivider, they
shall so inform the subdivider. In the event the Selectboard approve the proposed
improvement guarantee as proposed by the subdivider, they shall notify the Planning
Board. The Planning Board shall not grant final approval until it has received such
notification from the Selectboard. The burden of submitting improvement guarantees in
compliance with this ordinance shall at all times remain with the subdivider. In
determining whether the form, amount and fraction of the improvement guarantees are
sufficient, the Selectboard shall consult with appropriate recommendations relative to the
guarantees as they pertain to the water system. The Selectboard may also seek other
technical or legal advice in making their determination.
4.3 Time Limits
4.3.1 Completion Deadline-All required improvements within a
subdivision shall be completed within 2 years of final subdivision
approval. The improvements guarantee must provide performance
protection to the Town during said 2-year period. The additional 6 month
period is required as protection to the Town in the event the subdivider
fails to complete the required improvements or fails to complete the
required improvements or fails to complete the required improvements or
fails to complete the required improvement or fails to complete them
satisfactorily.
4.3.2 Extension- The Selectboard may extend the completion deadline for
two additional years at one-year increments only where the subdivider
presents substantial reason for doing so. No request for extension shall be
considered after the completion deadline. Before extending the initial
deadline or the initial extension, the Selectboard shall require that the
improvements guarantee by extended in duration to cover the extended
period of time plus an additional 6 month period. Before extending the
initial deadline, or the initial extension, the Selectboard shall review the
form and amount of the improvement guarantee to make certain it remains
adequate.
4.4 Inspection
4.4.1 The Selectboard or their duly appointed representative shall
regularly inspect the construction of the required improvements for
defects. The Superintendents of the Newport Water and Sanitary Districts
may also make such inspections. The subdivider shall cooperate with the
Selectboard or their representative who is carrying out these inspections
and with the Water and Sanitary Districts. Upon completion of the
16
improvements the Selectboard shall notify the Superintendent of the Water
District, in writing, that the improvements are complete and request
information from him about whether the water or sewer system has been
satisfactorily completed according to the approved subdivision plan. If
improvements have not been satisfactorily completed, the Selectboard
shall list the defects.
4.4.2 Upon completion of the improvements, the subdivider shall file the
following with the Selectboard:
1. A sworn statement from the subdivider's engineer that all
required improvements are completed in strict compliance with all
applicable construction standards and the approved subdivision
plan; and that the engineer knows of no defects from any cause in
the improvements;
2. A sworn statement from the subdivider that the improvements
are free and clear of any encumbrance or lien; and that the
subdivider knows of no defects from any cause, in the
improvements.
4.5 Release of Guarantee- As soon as the Selectboard or their authorized
representative has inspected the improvements and certified that they are
satisfactorily completed as required in 4.4.1 of this ordinance, and the subdivider
has filed the letters required in Section 4.4.2 of this ordinance with the
Selectboard, the Selectboard shall release the previously required improvement
guarantee to the subdivider.
4.6 Reduction of Guarantee- No improvement guarantee shall be reduced in value
until all required improvements are satisfactorily completed.
4.7 Incomplete or Unsatisfactorily Work- If the Selectboard determine, according
to the procedures laid out in Section 4.4.1 of this ordinance, that the
improvements have not been satisfactorily completed according to the accepted
subdivision plan, within the agreed upon time, they shall inform the subdivider in
writing of the Town's intent to exercise its rights against the improvement
guarantee. They shall exercise any and all such rights; and shall cause the
incomplete or unsatisfactory work to be completed and to be paid from the
improvement guarantee assets. Any guarantee assets unused in the completion of
the unsatisfactory or incomplete work may be returned to the subdivider at the
discretion of the Town.
4.8 Improvement Guarantee Options
17
4.8.1 Performance Bond- Under this improvement guarantee option, the
subdivider shall obtain a subdivision bond from a surety bonding company
authorized to do business in the State of Maine. The bond shall be payable to the
Town of Newport and shall be in the amount sufficient to cover the full cost of all
required improvements as estimated by a registered Professional Engineer and as
approved by the Selectboard. The duration of the bond shall be for a period of
time acceptable to the Selectboard, but in any case shall be for at least 2 years and
6 months and for not more than 3 years, unless the subdivider is granted an
extension in accordance with Section 4.2 of this ordinance. In the event an
extension is granted, the Selectboard shall require the duration of the subdivision
bond to be extended for at least 6 months from the termination of the new time
limit but not for more than 1 year from the termination of the new time limit.
4.8.2 Property Escrow- Under this improvement guarantee option, the
subdivider shall provide real estate as a guarantee. The value of such property
shall be an amount sufficient to cover the full cost of all required improvements as
estimated by a registered Professional Engineer and as approved by the
Selectboard.
If property escrow is proposed for the improvement guarantee, the subdivider
must comply with the following requirements:
1. The value of the real estate shall be the value as established by the
Town Assessor and, in making his valuation the Town Assessor shall take into
account the possibility of a decline in value during the term of the improvement
guarantee.
2. The subdivider shall, at his expense, provide the Town with a title
opinion from an attorney approved by the Town; said title opinion shall establish
that the subdivider has good and clear title to the premises, free of all liens and
encumbrances. However, if encumbrances do exist on said real estate, the
Selectboard may in their sole discretion accept the proposed real estate as
security, provided that they determine that it is in the Town's best interest to do
so.
3. The subdivider shall enter into an Agreement with the Town and a
mortgage, which mortgage shall be recorded in the Registry of Deeds; said
Agreement and mortgage shall provide that the ownership of the property shall be
transferred to the Town, unless the subdivider satisfactorily completes the
required improvements in accordance with this ordinance and with the approved
final subdivision plan. Said agreement and mortgage shall be in such form and
shall contain such additional provisions as may be required by the Selectboard.
4.8.3 Letter of Credit-Under this improvement guarantee option, the
subdivider shall provide as a guarantee an irrevocable letter of credit from
a bank or other reputable institution satisfactory to the Selectboard. The
18
amount of such letter of credit shall be in an amount sufficient to cover the
full cost of all required improvements as estimated by a registered
Professional Engineer and as approved by the Selectboard. The letter of
credit shall be deposited with the Selectboard and shall certify the
following:
1. That the creditor does guarantee funds in an amount equal to the
costs estimated for the subdivider by a registered Professional
Engineer and approved by the Selectboard of completing all
required improvements;
2. That, in case of failure on the part of the subdivider to complete
the specified improvements satisfactorily within the required time
period, the creditor shall pay to the Town of Newport immediately,
and without further action, such funds as are necessary to finance
the proper completion of these improvements, up to the limit of
credit stated in the letter.
3. That the letter of credit is valid for the period of time required
by the Selectboard. The period of time, not less than 2 years and 6
months from the date of subdivision approval, shall be stated in the
letter. During that time the letter may not be withdrawn or reduced
in amount except with the approval of the Selectboard.
4.8.4 Cash Escrow- Under this improvement guarantee option, the
subdivider shall provide as a guarantee cash held in an account at a bank
or other reputable institution subject to the approval of the Selectboard.
The amount of cash shall be in an amount sufficient to cover the full cost
of all required improvements as estimated by a registered Professional
Engineer and approved by the Selectboard. The subdivider shall enter into
an Agreement with the Town that shall stipulate the terms under which the
Town may accept a cash escrow.
ARTICLE 5-GENERAL REQUIREMENTS AND DESIGN STANDARDS
5.1 General Requirements
5.1.1 Conformity with Other Laws and Regulations-All proposed
subdivisions shall be in conformity with the Comprehensive Plan of the
Town of Newport, as amended, and with the provisions of all pertinent
state and local codes, ordinances, laws and regulations.
5.1.2 Character of the Land-Land to be subdivided shall be of such
character that it can be used safely for building purposes without danger to
health, or peril from fire, flood, or other menace. The Planning Board shall
not approve such portions of any proposed subdivision that are located on
19
land (below sea level), within the 100 year frequency flood plain, or on
land which must be filled or drained, or on land created by diverting a
watercourse. In no instance shall the Planning Board approve any part of a
subdivision located on filled wetland.
5.2 Lots
5.2.1 Lots to be Buildable-The lot arrangement shall be such that in
constructing a building in compliance with the laws and ordinances of the
Town of Newport and the State of Maine, there will be no foreseeable
difficulties for reasons of topography or other conditions. Lots should not
be of such dimension as to later encourage the creation of a second
building lot out of the first.
5.2.2 Side Lines-All side lines of lots shall be at right angles to straight
lines and radial to curved street lines, unless a variance from this rule will
give a better street or lot plan.
5.2.3 Corner Lots-In general, corner lots should be larger than interior lots
to provide for adequate building setback from each street and to provide a
desirable building site.
5.2.4 Frontage-All lots shall have at least 100 ft. of frontage on public
street; lots with on-site sewage disposal shall have 200 ft. of frontage on a
public street.
5.2.5 Frontage on Private Street-Frontage on private streets shall be
deemed acceptable only if such streets are designed and improved in
accordance with these regulations and the frontage meets the requirements
of Section 5.2.4 of this ordinance.
5.3 Drainage Improvements
5.3.1 Removal of spring and Surface Water-The subdivider may be
required by the Planning Board to carry away by pipe or open ditch any
spring, surface or storm water that may exist either previous to or as a
result of the subdivision. Such drainage facilities shall be located in the
street right-of-way where feasible, or in perpetual unobstructed easements
of appropriate width.
5.3.2 Drainage Structure to Accommodate Potential Development
Upstream-A culvert or other drainage facility shall be large enough to
accommodate potential run-off from its entire upstream drainage area,
whether inside or outside the subdivision. The facility shall be designed
based on anticipated run-off from a ten-year storm under conditions of
20
total potential development permitted in the watershed by the Land Use
Ordinance.
5.3.3 Responsibility for Down Stream Drainage-If requested by the
Planning Board, the subdivider's engineer shall study the effect of the
proposed subdivision on the existing down-stream drainage facilities
outside the area of the subdivision. Where it is anticipated that the
additional run-off incident to the development of the subdivision will
overload an existing down-stream drainage facility during a storm with
recurrence interval of five years, the Planning Board shall notify the
Selectboard of such potential conditions. In such case the Planning Board
shall not approve the subdivision until provision has been made for the
improvement of said condition.
5.3.4 The Planning Board shall require that easements for drainage be
turned over to the town.
5.3.5 Phosphorous Control-The subdivider shall incorporate whatever
stormwater runoff controls or treatment measures as necessary to prevent
additional phosphorous loading to Sebasticook Lake.
5.4 Open Space and Recreation Land
5.4.1 Requirement- The Planning Board may require that up to 5% of the
. land area of a subdivision with more than 20 acres or 20 lots be set aside
for open space or recreation. The actual amount of land and its location
shall be satisfactory to the Planning Board. In making decisions about land
set aside, the Planning Board shall be guided by the following standards:
1. Any land to be set aside as a requirement of this ordinance shall
be reasonably adaptable for use for active plan and recreation
purposes unless the Planning Board agrees to an open space area
designed primarily for the protection of the natural environment.
The Planning Board may only agree to the designation of such
natural area if it determines that the active play and recreation
needs of the residents of the subdivision will be reasonably met by
other existing facilities. Active play and recreation areas shall be
located so as to be convenient to the people to be served. Factors
used in evaluating the adequacy of proposed park and recreation
areas shall include size and shape, topography, geology, tree cover,
access, location and projected use.
2. In no case shall a subdivider be required to set aside more than
5% of the land area of a subdivision for open space or recreation
purposes without financial compensation.
21
In deciding whether to require land set aside, the Planning Board
shall be guided by the following considerations:
a. Whether the subdivision is already served by adequate
recreational opportunity.
b. Whether the town's adopted Comprehensive Plan calls for a
park to be located in the area of the subdivision.
c. Whether adjacent to the subdivision is a community park or
open space, which would be benefited by the addition of land in
the subdivision.
5.4.2 Provision for Ownership and Maintenance of Open Space or
Recreation Land-If land is set aside under the provisions of 5.4.1 of this
ordinance, the subdivider shall make provisions for the permanent
ownership, protection and maintenance of such land. The Planning Board
shall not approve such provision or the subdivision until it is satisfied that
the land will be protected as open space in the future and that adequate
provision has been made for its ownership and maintenance. The
subdivider shall either:
1. Retain ownership and responsibility for maintenance of such
land; or
2. Dedicate such land and property or facilities to public use if the
town or another public agency had indicated it will accept such
dedication; or
3. Provide for or establish one or more organizations for the
ownership and maintenance of all common open space and
property. Such organization shall be either a non-profit
homeowner's association or a community open space trust is
formed, it shall be governed according to the following
regulations:
a. The organization shall be organized by the subdivider and
operating, with financial support by the subdivider, if
necessary, before the sale of any lots within the development.
b. Membership in the organization is mandatory for all purchasers
of lots therein and their successors.
c. The organization shall be responsible for maintenance of
common open space or recreation land. It shall also be responsible
for insurance and taxes on same.
22
d. The members of the organization shall share equitably the cost
of maintaining and developing common open space and recreation
land in accordance with procedures established by them.
e. The organization shall have or hire adequate staff to administer
common facilities and maintain the common open space and
recreation.
5.5 Street Standards
5.5.1 Layout of Streets-All streets in a subdivision shall be planned so as
to meet the following standards:
1. The proposed streets shall conform, as far as practical, to the
adopted Comprehensive Plan or policy statement of the Town of
Newport.
2. All streets in the subdivision shall be designed so as to provide
safe vehicular travel and, in minor streets, shall be designed so as
to discourage movement of through traffic.
3. The arrangement of streets in the subdivision shall provide for
the continuation of arterial and collector streets into adjoining
-unsubdivided land unless topographic or other factors make
continuance impracticable or undesirable. Where a subdivision is
served by a minor street, the Planning Board may require that a
right-of-way or the minor street be projected to adjacent
unsubdivided land when the Board finds that such a projected
street would be in keeping with the land use goals for the area and
with sound planning practice.
4. Reserve strips controlling access to streets shall be prohibited.
5.Intersections of streets shall be at angles as close to (90) ninety
degrees as possible. In no case shall two street intersect at an angle
of less than (60) sixty degrees.
6. A distance of at least 200 feet shall be maintained between
centerlines of offset intersecting streets.
7. Whenever possible, subdivisions containing fifteen lots or more
shall have at least two street connections with existing public exits,
or streets on an approved Subdivision Plan.
23
8. Where a subdivision borders an existing narrow road (below
standards set herein) or when the Comprehensive Plan indicates
plans for realignment or widening of a road that would require land
in the subdivision, the subdivider shall be required to show areas
for widening or realigning such roads on the preliminary and the
final plan, marked "Reserved for road alignment (or widening)
purposes". Land reserved for such purposes or for satisfying
setback or yard or area requirements in other land use control
ordinances if such exists.
9. The Planning Board shall determine whether a street shall be
designed and constructed as a collector or minor street.
5.5.2 Design and Construction Standards- All streets in a subdivision
shall be designed and constructed to meet the following standards for
streets according to their classification.
Mandatory design and construction standards for streets: (Note: The
asterisked (*) items may be reduced only if the Maine Department of
Environmental Protection determines that a narrower right-of-way and/or
pavement width would be justified for lower phosphorous loading to
Sebasticook Lake.
Design and Construction Standards for Streets
Items Collector Minor
1. Minimum Right-of-way width *66' #50?
2. Minimum Pavement Travel surface *24° #20"
3. Minimum Grade 0.5% 1.0%
4. Maximum Grade 8% 8%
5. Maximum Grade at intersection: 3% within ies 50'
(of intersection) (of intersection)
6. Minimum centerline radii on curves 200° 200'
7. Minimum tangent length between reserve curves 200' 200'
8. Gravel sub-base 18" 18"
8.1 MDOT Specification 703.06 (b) Type D, maximum stone size of 6"
9. Gravel base 4" 4"
24
9.1 MDOT Specification 703.06 (a) Type A.
10. Road cross slope/foot 2%" /a-%4"
11. Minimum shoulder width on each 3' 3'
side of road travel surface.
12. Deadend
1. Radii of turn around 66' 66'
at enclosed end of
Right-of-Way boundary
2. Outside pavement radius 47° 47
3. Minimum Width of Pavement 30' 30'
13. Grades of streets shall conform as closely as possible to the original relief of the land.
14. All changes in grade shall be connected by vertical curves of such length and radius
as will provide clear visibility for a distance of 200'.
15. Side slopes shall not be steeper than 3 feet horizontal and | foot vertical, graded,
loamed (4 inches compacted) and seeded. If the side slope extends outside the required
right-of-way, the subdivider shall expand the right-of-way to include the entire side slope
area.
16. All streets shall be provided with adequate drainage facilities to provide for the
removal of storm water to prevent flooding on the pavement and erosion of adjacent
surfaces. Driveway culverts shall be adequate to pass the design flow of the contiguous
ditches, and shall be a minimum of 12-inch diameter.
17. In construction of roads, the paved area, sidewalk and shoulder shall be cleared of all
stumps, roots, brush, perishable material and all trees not intended for preservation. All
loam, loamy material, clay, and other yielding material shall be removed from the
roadway to at least subgrade depth, or as directed by the Selectboard.
18. The roadway area shall be brought to the grade shown on the plan, profile and cross-
section. All gravel shall meet the specifications for Aggregate Subbase Courses as
contained in the current edition of the Standard Specification for Highways and Bridges
of the State of Maine Department of Transportation. The gravel base shall be brought to
within four inches (4"') of the finish and the top four inches shall be selected materials
suitable for finish grade on gravel roads. All gravel shall be thoroughly compacted and
rolled and the final surface left true to estimated lines and grades.
25
18-A. After the final gravel has been thoroughly rolled, the surface of the roadway shall
be covered with bituminous pavement, to a minimum depth specified by the Planning
Board, consistent with MDOT standards, but in no event less than three inches (3"). This
pavement shall cover the entire width of the Travel Surface, from road shoulder or
esplanade to road shoulder or esplanade.
Items Collector Minor
19. Number of Sidewalks 1 1
20. Sidewalks
1. Minimum width = oe
2. Gravel Base Course 6 6"
3. Surface Bituminous 2° =
21. Sidewalks: Planning Board may waive the requirements for sidewalks except in
those subdivisions where the Planning Board has made a determination that the volume
of vehicular traffic and or speed limits present a hazard to pedestrians or that the density
of multi-unit housing would create pedestrian traffic greater than what would be
reasonable expected from single family housing on individual lots.
22. The base and sub-base shall be thoroughly machine compacted and fine graded to
cross slop specifications from centerline to outer edge of shoulders.
23. The Planning Board may require curbing of roads.
24. Minimum curb radii at Intersections 20'
5.5.3 Utilities in Streets-The Planning Board shall, wherever possible, require that
underground utilities be placed in the street right-of-way between the paved
roadway and the street line to simplify location and repair of lines when they
require attention. The subdivider shall install underground service connections to
the property line of each lot within the subdivision for such required utilities
before the street is paved.
5.5.4 Street names
1. Proposed street names shall be substantially different from existing
street names so as not to be confused in sound or spelling.
2. If proposed streets are extensions of existing streets they shall carry the
same name.
3. Generally no street should change direction by more than ninety (90)
degrees without a change in street name.
26
4. In general, streets shall have names, not numbers or letters.
5.6 Utilities
5.6.1 If public water and/or sewer are proposed, the system shall be designed so
as to accommodate any development that can reasonably be expected to tie into
the system. In determining the amount of reasonably expected development, the
Planning Board shall consider existing land use, shoreland zoning, the character
of the land, topography, and existing constraints to development (such as boggy
areas). The carrying capacity of the land of existing municipal services, and the
Town's comprehensive plan or sewer and water plan.
5.6.2 The subdivider shall install any new public utility system at his own
expense, according to the approved subdivision plan. If either the public sewer or
water system follows a course that is not co-linear with the road network, the
Planning Board shall require that the subdivider provide the Newport Sanitary
District or the Newport Water District with utility easement before granting final
approval.
5.6.3 If Individual wells are proposed for the subdivision, the Planning Board may
require that the subdivider's engineer certify that sufficient water is available for
the reasonably foreseeable needs of the subdivision.
5.6.4 If subsurface sewage disposal is proposed, the Planning Board shall require
that the subdivider provide proof that a subsurface sewage disposal system that is
in conformance with the Maine State Plumbing Code can be installed on every
lot.
5.7 Off-Site Improvements-Where necessary to serve the needs of the proposed
subdivision and to protect the health, safety and general welfare of the community, the
Planning Board may require that off-site improvements of Newport's Sewer or Water
System be completed at the subdivider expense. Existing unpaved streets shall, whenever
necessary, reasonable, and practical, be improved to the standards required by this
ordinance.
ARTICLE 6-WAIVER AND MODIFICATION OF THESE REGULATIONS
6.1 Where the Planning Board finds that extraordinary, and unnecessary hardships may
result from strict compliance with this ordinance; or where there are special
circumstances of a particular plan it may waive any of this ordinance provided that such
waiver will not have the effect of nullifying the purpose of this ordinance, the
Comprehensive Plan, the Shoreland Zoning Ordinance, or any other ordinance.
6.2 In granting any waiver, the Planning Board shall require such conditions as will in its
judgement, secure substantially the objectives of the requirements so waived.
27
ARTICLE 7- REPEAL OF PREVIOUS SUBDIVISION ORDINANCE, VALIDITY,
EFFECTIVE DATE, CONFLICT OR ORDINANCES AND FILING
7.1 The Town of Newport Subdivision Ordinance, adopted on June 9, 1975 at Town
Meeting is hereby repealed.
7.2 Should any section or provision of this ordinance be declared by the courts to be
invalid, such section shall not invalidate any other section or provision of this ordinance,
and to this end, the provisions of this ordinance are hereby declared to be severable.
7.3 The effective date of this ordinance is March 5, 1983.
7.4 Except as provided in Section 7.1 of this ordinance, this ordinance shall not repeal,
annul, or in any way impair or remove the necessity of compliance with any other rule,
regulation, by-law, permit, or provision of law. Where this ordinance imposes a higher
standard for the protection and promotion of health and safety, the provisions of this
ordinance shall prevail.
ARTICLE 8-AMENDMENTS
This ordinance may be amended by a majority vote of the Town at Town Meeting.
ARTICLE 9-APPEALS
An appeal may be taken, within 30 days from the Planning Board's decision of the Final
Plan, by any party to Superior Court in accordance with Rule 808 of the Rules and Civil
Procedure.
ARTICLE 10- DEFINITIONS
10.1 Words and terms not defined in Section 10.2 shall have their customary dictionary
meanings.
10.2 The following words and terms for the purpose of this ordinance, shall be designed
as follows:
10.2.1 Subdivision-is the division of a tract or parcel of land into 3 or
more lots within any five-year (5-year) period, where accomplished by
1. Sale or lease of land;
2. Offering to sell or lease land;
3. Construction, sale or lease of principal buildings; or
4. Offering to construct, sell or lease principal buildings.
28
In determining whether a tract or parcel of land is divided into
three or more lots, the first dividing of such tract or parcel, unless
otherwise exempted herein, shall be considered to create the first 2
lots, by whomever accomplished, unless otherwise exempted
herein, shall be considered to create a third lot.
Exemptions-In determining whether a tract or parcel of land is
divided into three or more lots, the following shall not be
considered as lots for the purpose of this ordinance.
1. One lot which the subdivider has used for his principal residence
for a period of at least 5 years immediately prior to the creation of
a subdivision;
2. Any lot containing 40 or more acres;
3. Any lot conveyed as a gift to a person related to the subdivider
by blood, marriage or adoption;
4. Any lot created by devise, condemnation or order of court;
5. Any lot transferred to the owner of land abutting thereon
A mobile home park shall be considered to be a subdivision.
10.2.2 Tract or Parcel of Land-All contiguous land in the same ownership,
provided that lands located on opposite sides of a public or private road
shall be considered each a separate tract of land unless such road was
established by the owner of land on both sides thereof.
10.2.3 Minor Subdivision-A subdivision with less than (6) lots which does
not involve the construction or reconstruction of a street and/or the
extension of public sewer and water lines and/or the construction of a
storm drainage system.
10.2.4 Major Subdivision-A subdivision which is not a minor subdivision.
10.2.5 Street-A street means and includes such ways as alleys, avenues,
boulevards, highways, roads, streets, and other rights-of-way intended for
use of motorized vehicles.
10.2.6 Public Street-Any street which has been officially accepted by the
Town of Newport as a public way.
29
10.2.7 Minor Street-A street which serves primarily as an access to
abutting properties.
August 28, 2013
"Attest, a true copy of an ordinance entitled Town of Newport Subdivision Ordinance, as
certified to me by the municipal officers of the Town of Newport, Maine, and adopted by
the Town meeting on the 23 day of March, 2013.
Signature: fu La. ( i, YA 4, A ;
Paula A. Scott, Municipal Clerk
Revised May 23, 2013, Special Town Meeting '
30