This is the exact embedded text of the captured official document.
Snapshot c53dedea80ad · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
2
Table of Contents
PART I GENERAL
6
1.1 Title
6
1.2 Authority
6
1.3 Purpose
6
1.4 Applicability
6
1.5 Conflicts with Other Ordinances
6
1.6 Validity and Severability
7
1.7 Effective Date
7
1.8 Amendments
7
1.9 Annual Administrative Review
7
PART II NONCONFORMANCE
8
2.1 Purpose
8
2.2 Burden of Proof
8
2.3 Nonconforming Use
8
2.3.1 Existing Nonconforming Uses
8
2.3.2 Existing Nonconforming Structures
9
2.3.3 Nonconforming Lots of Record
9
2.3.4 Construction Begun Prior to Ordinance
10
2.3.5 Pending Application for Land-Use Permits
10
2.4 Transfer of Ownership
10
PART III ZONING DISTRICTS
11
3.1 Rules Governing District Boundaries
11
3.2 Land Use Requirements
11
3.3 Establishment of Districts
11
3.3.1 Village District
11
3.3.2 Rural District
11
3.3.3 Fresh Pond Watershed Protection District
12
3.3.4 Shoreland Zoning District
12
3.4 District Requirements
12
3.5 Compliance with Performance Standards Required
12
3.6 Land Uses Allowed in Each of the Districts
12
Table 3.6.1: Land Uses
13
3.7 Dimensional Requirements
17
Table 3.7.1: Dimensional Requirements
18
3
PART IV PERFORMANCE STANDARDS
21
4.1 General Standards
21
4.1.1 Accessory Dwelling Unit to Single-family Residential Use
21
4.1.2 Access Point - Vehicle
21
4.1.3 Agricultural Management Activities
21
4.1.4 Air Pollution
22
4.1.5 Archaeological and Historic Resources
22
4.1.6 Buildings/Structures/Premises
22
4.1.7 Campgrounds
22
4.1.8 Clearing of Trees/Vegetation
22
4.1.9 Erosion and Sedimentation Controls/Stormwater Management
23
4.1.10
Fences
24
4.1.11
Flood Hazard Area
24
4.1.12
Fresh Pond Watershed Protection District
24
4.1.13
Home Occupation
24
4.1.14
Junkyards/Automobile Graveyard/Automobile Recycling Facilities
25
4.1.15
Lighting Design Standards (Commercial Use)
25
4.1.16
Livestock
25
4.1.17
Lodging Facilities
26
4.1.18
Lot Divided by Road
26
4.1.19
Manufactured Housing
26
4.1.20
Mineral Exploration and Extraction
26
4.1.21
Manufactured/Mobile Home Parks
26
4.1.22
Multi-Family Dwellings
26
4.1.23
Off-street Parking/Loading
27
Table 4.1.23.1: Minimum Parking Space Requirements
28
4.1.24
Ponds
29
4.1.25
Private Way
29
4.1.26
Signs
30
4.1.27
Subdivisions
31
4.1.28
Swimming Pools
31
4.1.29
Topsoil and Vegetation Removal During Construction
31
4.1.30
Towers, Wireless Communications
31
4.1.31
Water Usage and Water Quality
31
4.1.32
Wind Energy System
32
4
PART V ADMINISTRATION AND ENFORCEMENT
33
5.1 Land Use Permits
33
5.2 Application for Land-use Permit
33
5.3 Authority for Application Review
33
5.3.1 Code Enforcement Officer
33
5.3.2 Planning Board
34
5.3.3 Board of Appeals
34
5.4 Fees
37
5.5 Code Enforcement Officer Permit
37
5.5.1 Activities Requiring Code Enforcement Officer Permit
37
5.5.2 Procedure
37
5.6 Planning Board Permit Review
39
5.6.1 Activities Requiring Planning Board Permit
39
5.6.2 Procedure
39
5.7 Other Requirements Before Approval
42
5.7.1 Right, Title, or Interest
42
5.7.2 Multiple Permits
42
5.8 Positive Findings Required
42
5.9 Enforcement
43
5.9.1 Violation
43
5.9.2 Legal Actions
43
5.9.3 Fines
43
5.9.4 Liability
43
5.10 Validity
44
5.11 Conflict with Other Ordinances
44
PART VI CONDITIONAL USES
45
6.1 Purpose
45
6.2 Applicability
45
6.3 Procedure
45
6.4 Criteria
45
6.5 Appeals
46
6.6 Conditions of Approval
46
6.7 Reapplication
46
PART VII SITE PLAN REVIEW
47
7.1 Purpose
47
5
7.2 Applicability
47
7.2.1 Commercial Use
47
7.2.2 Impervious Surface
47
7.2.3 Vacancy
47
7.2.4 Change of Use
47
7.2.5 Revised Plans
47
7.2.6 Expansion of Existing Business
47
7.3 Procedure
48
7.3.1 Pre-Application Meeting
48
7.4 Performance Standards
48
7.4.1 Soils and Erosion Control
48
7.4.2 Vehicle Access
48
7.4.3 Parking and Circulation
48
7.4.4 Surface Water Drainage
49
7.4.5 Existing Utilities
49
7.4.6 Special Features of Development
49
7.4.7 Exterior Lighting
49
7.4.8 Emergency Vehicle Access
49
7.4.9 Municipal Services
49
7.4.10
Water Quality
49
7.4.11
Air Quality
49
7.4.12
Water Supply
49
7.5 General Provisions
49
7.5.1 Conformance
49
7.5.2 Expiration
50
7.5.3 Technical Review
50
7.5.4 Conditions of Approval
50
7.5.5 State and Federal Review
50
7.6 Appeals
50
APPENDIX A: DEFINITIONS
51
Word Usage
51
APPENDIX B: [REMOVED]
63
APPENDIX C: MAPS
64
North Haven Land Use Districts Map
64
North Haven Village District Map
64
6
PART I GENERAL
1.1 Title
This Ordinance will be known as and may be cited as the "Land Use Ordinance of the Town of
North Haven, Maine," and will be referred to herein as the "Ordinance."
1.2 Authority
This Ordinance is adopted pursuant to Home Rule Powers as provided for in Article VIII of the
Maine Constitution and Title 30-A M.R.S.A., Section 4352 and Title 38 M.R.S.A., Section 435, et
seq.
1.3 Purpose
The purpose of this Ordinance is to protect the safety, health, and general welfare of the
inhabitants of the Town of North Haven; to preserve and protect the surface and groundwater
supply; to preserve the Town's shoreland and other natural resources; to protect commercial fishing
and maritime industries; to protect freshwater and coastal wetlands; to protect archaeological,
historic, and ecological resources; to conserve natural beauty and open space; to manage the
placement of structures, buildings, and applicable land uses; to address proper sewage disposal
systems; and provide for traffic safety.
This Ordinance establishes a system for classifying all the land in the Town into land use districts.
These District classifications (Village, Rural, Shoreland, and Fresh Pond Watershed Protection) are
based on factors such as: present land use, proximity to water bodies, the ability of the Town to
provide necessary services, and to help manage growth.
This Land Use Ordinance, guided by the North Haven Comprehensive Plan, is designed to anticipate
and respond to the impacts of development, and to provide the means for assessing development
proposals for their fiscal impacts on the municipality's ability to provide and improve necessary
public facilities and services.
1.4 Applicability
This Ordinance applies to all land, water areas, offshore islands, and all structures under the
jurisdiction of the Town of North Haven. This includes any Shoreland Zone(s) and other Districts,
as amended from time to time, which shall have the effect of overlaying zoning districts. Where a
provision of this Ordinance and those of Shoreland Zoning conflict, whichever is the stricter
provision shall prevail.
After the adoption of this Ordinance, all buildings or structures constructed, reconstructed, altered,
enlarged, or moved, and the uses of buildings and land, including the division of land, will be in
conformity with the provisions of this Ordinance. No existing or future building, structure, or land
area will be used for any purpose or in any manner except as provided in this Ordinance.
1.5 Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of
this Ordinance or of any other ordinance, regulation, or statute, the more restrictive provision will
control.
7
This Ordinance supersedes and replaces the Land Use Ordinance which became effective on October
9, 1996, and all amendments and will not prevent enforcement of the repealed ordinance with
respect to the time periods in which it was in effect.
1.6 Validity and Severability
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decisions will not invalidate any other section or provision of this Ordinance.
1.7 Effective Date
The effective date of this Ordinance, when adopted, and any amendments thereto, will be effective
immediately following its/their adoption or approval at a Town Meeting. A copy of this Ordinance
certified by the Town Clerk will be filed and made available to the public at reasonable cost at the
expense of the person making the request. Notice of this availability will be posted.
1.8 Amendments
This Ordinance may be amended by a majority vote of any Town Meeting. Amendments may be
initiated by a majority vote of the Planning Board, or by request of the Select Board to the Planning
Board, or on petition presented to the Select Board by a number of registered voters equal to 10% of
the votes cast in the last gubernatorial election in the Town. The Planning Board will conduct a
public hearing on any proposed amendment.
1.9 Annual Administrative Review
The Code Enforcement Officer, Planning Board, and Board of Appeals each will report annually, in
the month of January, to the Select Board on their respective experience with the administration of
this Ordinance during the previous year. Their reports to the Select Board will include any
recommended amendments that would:
1. Enhance their ability to more effectively meet their respective administrative
responsibilities under this Ordinance; and
2. Enhance the implementation of the purposes of this Ordinance contained in Section 1.3,
above.
The failure of any person or board to comply with this provision will not affect the validity or
enforceability of this Ordinance in any way.
8
2 PART II NONCONFORMANCE
2.1 Purpose
The purpose of this section is to regulate nonconforming lots, uses, and structures as defined in this
Ordinance such that they can be reasonably developed, maintained, repaired, or changed so that they
are less nonconforming.
It is the intent of this Ordinance to promote land use conformities, except that nonconforming
conditions that existed before the effective date of this Ordinance or amendments thereto shall be
allowed to continue, subject to the requirements set forth in this section. Except as otherwise
provided by this Ordinance, a nonconforming condition shall not be permitted to become more
nonconforming.
2.2 Burden of Proof
The burden of establishing that any nonconforming structure, use, or lot is a lawfully existing
nonconforming structure, use, or lot as defined in this Ordinance, will, in all instances, be upon the
owner of such nonconforming structure, use, or lot and not upon the Town of North Haven. In all
cases, ownership will be evidenced by a copy of the deed as registered in the Knox County Registry
of Deeds, or for leased parcels by a copy of the Town Tax Maps.
2.3 Nonconforming Use
The use of any building, structure, or parcels of land that is made nonconforming by reason of the
enactment of this Ordinance, or that will be made nonconforming by reason of a subsequent
amendment, may be continued, subject to the following provisions:
2.3.1 Existing Nonconforming Uses
Continuance of nonconforming uses of land and structures will be subject to the following
provisions:
1. An existing nonconforming use will not be enlarged or increased, nor extended to
occupy a greater area of land than that occupied at the effective date of this
Ordinance, or any amendment thereto.
2. If any nonconforming use of land ceases for any reason for a period of more than
thirty six (36) consecutive months, any subsequent use of land will conform to the
regulations specified by this Ordinance.
3. A nonconforming use of land may be moved within the boundaries of its lot provided
that the Planning Board finds that the new proposed location of the land use or
building results in less nonconformity than the original location and the Planning
Board may require the applicant to provide information regarding fencing, screening,
landscaping, topography, natural features, traffic, access, and any other pertinent
features.
4. Any nonconforming use may be extended throughout any parts of a building that
were manifestly arranged or designed for such use at the time of the adoption or
amendment of this Ordinance, but no such uses will be extended to occupy any land
outside such building.
5. A structure housing an existing nonconforming use may be moved, within the lot, in a
manner that would result in the new location of the nonconforming use being less
nonconforming than the original location.
9
2.3.2 Existing Nonconforming Structures
Improvements to nonconforming structures will be subject to the following provisions:
1. A nonconforming structure may be enlarged or altered in any way that does not
increase its nonconformity.
2. Any nonconforming structure can be entirely rebuilt, providing it does not exceed the
existing footprint, provided rebuilding is begun within one (1) year of the land use
permit being issued.
3. A nonconforming structure may be moved within its lot so long as it is in greater
conformance with the Ordinance
4. The enlargement meets the setback and height requirements of the district; (a) if the
enlargement or accessory structure is on the same lot as the non-conforming structure
and contains no more than thirty three percent (33%) of the ground area of the
grandfathered structure; or (b) the enlargement or accessory structure fills in a void in
the existing non-conforming structure (such as the inside of an ell) such that the entire
structure, including any accessory structure, when viewed as a whole either meets the
district's setback requirements or is no more nonconforming than the pre-existing
nonconforming structure.
5. Any nonconforming building or structure which is damaged or destroyed by fire or
other causality may be restored and reconstructed in conformance with its original
dimensions, provided that a building permit is obtained for such reconstruction within
twenty-four (24) months of the date of destruction. Nothing in this section will
prevent the demolition of the remains of any building or structure damaged or
destroyed.
2.3.3 Nonconforming Lots of Record
1. A single parcel of land, the legal description of which was recorded in the Registry of
Deeds on or before October 9, 1996, that does not meet the lot dimensional or area
requirements, or both, of the District in which it is located, may be built upon as an
existing non-conforming lot of record provided that such lot is not contiguous with
any other lot in the same ownership and provided that all other provisions of this
Ordinance are met.
2. If two or more contiguous lots of record are in the same ownership on or after
October 9, 1996, and if all or part of the lots do not meet the area or dimensional
requirements of this Ordinance, the lands comprised by such lots shall be considered
as a single parcel of land for the purposes of complying with the dimensional or area
requirements in this Ordinance.
3. On or after the effective date of adoption or amendment of this Ordinance, approved
on November 20, 2023, no division of a lot will be made which reduces any
dimension or area below the requirements of this Ordinance; and no lot will be
created which does not meet or exceed the area requirements of this Ordinance,
except for conveyance to an abutting owner, or for conservation use as defined. New
rear flag lots will not be created as of the effective date of this Ordinance.
4. No division of a parcel shall be made that creates any dimensions or area below the
requirements of this Ordinance, and if any such lot is created after enactment of this
Ordinance or any amendments thereof, that lot shall not be built upon. If after
10
combining all contiguous lots in the same ownership, the parcel meets the
dimensional requirements of this Ordinance, it may be built upon.
2.3.4 Construction Begun Prior to Ordinance
Adoption or amendment of this Ordinance will not require any change in the plans,
construction, size, or designated use for any building, structure, or part thereof for which a
completed application for a local permit has been made, provided the application has been
subject to review, or a Land Use Permit has been issued, and upon which construction has
been commenced prior to such adoption or amendment.
2.3.5 Pending Application for Land-Use Permits
Nothing in this Ordinance will require any change in the plans, construction, size, or
designated use for any building, structure, or part thereof for which a Land Use Permit has
been issued or upon which construction commenced prior to the adoption or amendment
of this Ordinance, provided construction will begin within six (6) months after the issuance
of such permit.
2.4 Transfer of Ownership
Ownership of land and structures which remain lawful but become nonconforming by the adoption
or amendment of this Ordinance may be transferred and the new owner may continue the
nonconforming uses subject to the provisions of this Ordinance.
11
3 PART III ZONING DISTRICTS
The purpose of these district requirements is to implement the municipality's Comprehensive Plan
and to provide for orderly growth and development.
3.1 Rules Governing District Boundaries
Unless otherwise set forth on the "Land Use District Map Town of North Haven," district boundary
lines are property lines; the centerlines of roads, streets, and rights-of-way, or such lines extended;
the center lines of water courses or such lines extended; or the Town boundary lines. Boundaries
indicated as following or parallel to shorelines will be construed to follow or be parallel to the
normal high water mark of such shorelines, and, in the event of changes in the shoreline, will be
construed as moving with the actual shoreline.
Where uncertainty exists as to the exact location of the district boundary lines, the Planning Board
will be the final authority on interpretation of the Zoning District Map and other factors in
determining the location of proposed improvements and changes of use.
Where a land use district boundary line divides a lot or parcel of land of the same ownership of
record at the time such line is established by adoption or amendment of this Ordinance, the
regulations applicable to the less restricted portion of the lot may be extended not more than one-
hundred (100) feet into the more restricted portion of the lot. This does not apply to lands subject to
Shoreland Zoning and Fresh Pond Watershed Protection requirements.
3.2 Land Use Requirements
Except as hereinafter specified, no building, structure, or land will hereafter be used or occupied; no
building or structure or part thereof will hereafter be erected, constructed, expanded, moved, or
altered; and no new lot will be created except in conformity with all of the regulations herein
specified for the district in which it is located, unless a variance is granted by the Board of Appeals.
3.3 Establishment of Districts
The areas to which this Ordinance is applicable are hereby divided into the following districts as
shown on the Official Map entitled "Land Use District Map of Town of North Haven" on file in the
municipal office of the Town, which is hereby made a part of this Ordinance. For the purposes of
this Ordinance, the Town will be divided into the following zoning districts and subdistricts.
It is understood that Shoreland Zoning is also applicable in some portions of all Districts.
3.3.1 Village District
This District allows for mixed use buildings and development. This is the practice of
allowing more than one (1) type of use in a building or buildings or a combination of
residential, commercial, (shops, restaurants, etc.), and community activities compatible with
public sewer (refer to the Sewer Ordinance for the Town of North Haven) and water. Mixed
use encourages retail, office, and living spaces in one (1) building. It is understood that
Shoreland Zoning is also applicable in lower Village District areas.
3.3.2 Rural District
The Rural District generally extends beyond the area of North Haven that is serviced by year-
round public water and sewer. It is intended that open space, agricultural, low-density
12
residential, and mixed uses be encouraged, such that they tend to enhance, reinforce, and
protect the rural, open atmosphere now characterizing much of the Town.
This includes all land in North Haven except that land defined in the Village, Shoreland
Protection, Resource Protection, and Fresh Pond Watershed Protection Districts.
3.3.3 Fresh Pond Watershed Protection District
For additional requirements see the Fresh Pond Watershed Protection District Ordinance.
3.3.4 Shoreland Zoning District
Refer to the Shoreland Zoning Ordinance.
3.4 District Requirements
Allowed uses and uses subject to this Ordinance and approval of the CEO or Planning Board will
conform to all dimensional requirements and other applicable requirements of this Ordinance. A
plumbing permit and land use permit will be required for all applicable buildings, uses, and sanitary
facilities according to the provisions of the Administration requirements in Section V of this
Ordinance. All uses will comply with the performance standards of Section IV of this Ordinance.
For all new construction, the Code Enforcement Officer and Plumbing Inspector must determine that
the property meets the requirements of the Maine State Plumbing Code before a building permit can
be issued. Renovations to existing structures or expansion of existing structures must also meet the
Maine State Plumbing Code. The Planning Board must hold a public hearing when they approve or
disapprove a conditional use permit or approve or disapprove a site plan review application, and
approve or disapprove a subdivision application.
3.5 Compliance with Performance Standards Required
All permitted uses must occur and be maintained in compliance with the applicable requirements and
performance standards contained in Section IV of this document.
3.6 Land Uses Allowed in Each of the Districts
Permitted uses, in accordance with the land use standards of this Ordinance, are shown in the Land
Use Table at Subsection 3.6.1 below.
13
Table 3.6.1: Land Uses
Key
Districts
Village District
Rural District
NOTE: Fresh Pond Watershed Protection District, please see Fresh Pond Watershed
Protection District Ordinance for North Haven, ME Shoreland Protection District,
please see Shoreland Zoning Ordinance Town of North Haven, Maine.
Permit Symbols
YES Yes, allowed without a permit, but must comply with land use standards.
CEO Code Enforcement Officer Permit required.
CU
Conditional Use Permit required.
NO
No, use not allowed.
NOTE: Site Plan applicability is determined by intensity of the use, not the use itself. See
section 6.2.
Uses
Land Use Districts
Village District Rural District
A. Residential Uses
1
Accessory dwelling unit
CEO
CEO
2
Accessory structures less than 32 sq. ft. or less a
YES
YES
3
Decks, porches, and handicap ramps
CEO
CEO
4
Duplex
CEO
CEO
5
Home garden c
YES
YES
6
Livestock d
YES
YES
7
Manufactured/Mobile home park (maximum 5 units) b
CU
CU
8
Multi-family dwelling (3-6 units)
CEO
CU
9
Single-family dwelling unit
CEO
CEO
10
Single family mobile home
CEO
CEO
11
Road and driveway construction
CEO
CEO
12
Swimming pools
CEO
CEO
13
Tennis courts
CEO
CEO
B. Retail, Light Commercial, Agricultural, and Civic
Uses
14
Uses
Land Use Districts
Village District Rural District
1
Agriculture
CEO
YES
2
Agricultural products processing
CEO
CEO
3
Animal grooming or clinic
CEO
CEO
4
Aquaculture
CU
CU
5
Art gallery/craft shop/gift shop
CEO
CEO
6
Automobile sales, rental, service, and repair station
CU
CU
7
Bakery
CEO
CEO
8
Boarding or riding stables
NO
CEO
9
Boat building/repair
CEO
CEO
10
Brewery
CU
CU
11
Building material, retail sales
CEO
CEO
12
Campground
NO
CU
13
Car wash
CU
CU
14
Cemetery
CU
CU
15
Church or place of worship
CU
CU
16
Civic, convention center
NO
CU
17
Commercial complex
CU
CU
18
Commercial greenhouse
CU
CEO
19
Commercial recreation
CU
CU
20
Commercial school
CU
CU
21
Communication facility
CU
CU
22
Communication tower
CU
CU
23
Community center
CU
CU
24
Community living arrangement (cohousing)
CEO
CEO
25
Construction equipment storage
CU
CEO
26
Day care center (adult or child)
CEO
CEO
27
Dry cleaning
CU
NO
28
Financial institution (Bank)
CEO
NO
15
Uses
Land Use Districts
Village District Rural District
29
Firewood processing/sawmill (commercial)
CU
CU
30
Fisheries processing/storage
CEO
CU
31
Fraternal and service club
CEO
CEO
32
Funeral home
CU
NO
33
Furniture stripping and wood preserving
CU
CU
34
Government facilities and grounds (Town)
CEO
CEO
35
Grocery and variety store
CEO
CEO
36
Health spa/fitness club/gym
CEO
CEO
37
Home occupation
CEO
CEO
38
Hospital
CU
CU
39
Indoor entertainment and recreation
CU
CU
40
Kennel/boarding site
NO
CEO
41
Laundromat
CEO
CEO
42
Light manufacturing/assembly plant
CEO
CEO
43
Liquor store (subject to state licensing requirements)
CU
CU
44
Lodging/boarding facilities (hotels, motels, bed and
breakfasts) maximum 15 rooms
CEO
CEO
45
Marijuana growing
NO
CU
46
Marijuana dispensaries
CU
CU
47
Medical clinic
CU
CU
48
Museum
CEO
CEO
49
Nursing home/assisted living/group home
CU
CU
50
Off street parking lot/ parking garage (stand alone)
CU
CU
51
Other retail business
CEO
CEO
52
Outdoor storage business
CU
CEO
53
Professional offices/office building
CEO
CEO
54
Public or private school
CU
CU
55
Publishing/printing
CEO
CEO
16
Uses
Land Use Districts
Village District Rural District
56
Redemption center
CU
CU
57
Repair services (other than auto), defined by applicant
CEO
CEO
58
Restaurant/take-out food service
CEO
CEO
59
Self storage building
CEO
CEO
60
Service business
CEO
CEO
61
Veterinary clinic
CEO
CEO
62
Wholesale business
CEO
CEO
C. Industrial and Heavy Commercial
1
Airport/airstrip
NO
CU
2
Automobile graveyard/junkyard
NO
CU
3
Boathouse and marine storage
CU
CU
4
Bulk oil and fuel storage
CU
CU
5
Demolition waste disposal
NO
NO
6
Golf course
NO
CU
7
Land application of sludge and waste
NO
CU
8
Landfill
NO
NO
9
Manufacture, use, storage, or disposal of solid or
hazardous materials
NO
NO
10
Mineral exploration, extraction, gravel pits, processing
or storage (including sand, gravel, and stone), affecting
an area greater than one acre.
NO
CU
11
Public utilities
CU
CU
12
Salt and salt/sand stockpiles
NO
NO
13
Solar farms
CU
CU
14
Timber harvesting
NO
CEO
15
Transportation facility and terminal
CU
CU
16
Warehouse
CU
CU
17
Wind power turbines e
CU
CU
D. Other Uses
17
a
Must meet the setbacks for the District.
b Please see Part VII, Site Plan Review section of this Ordinance.
c
Maximum area of six hundred (600) square feet, no use of pesticides, herbicides, or chemical
fertilizers.
d Refer to Article 4.1.16
e See current Wind Tower Ordinance for the Town of North Haven, Maine.
f
Excavation and filling refers to activity on the worksite and does not apply to stockpiles of
material.
g
See section 4.1.8
3.7 Dimensional Requirements
All structures and uses will meet or exceed the following minimum requirements. Other provisions
of this Ordinance may require additional lot area or setbacks. See notes following the table for
additional requirements.
Uses
Land Use Districts
Village District Rural District
1
Accessory structures
CEO
CEO
2
Airstrip
NO
CU
3
Mixed use development
CU
CU
4
Cutting trees for driveways, houses, and accessory
structures
YES
YES
5
Excavation and filling of <50 cubic yards
YES
YES
6
Excavation and filling of 50 - 500 cubic yards f
CEO
CEO
7
Excavation and filling of >500 cubic yards
CU
CU
8
Forest management activities (includes cutting trees) g
YES
YES
9
Low intensity recreation
YES
YES
10
Moving and demolition of buildings
CEO
CEO
11
Resurfacing an existing driveway
YES
YES
12
Signage
CEO
CEO
18
Table 3.7.1: Dimensional Requirements
Key
Districts
Village District, Mixed use commercial and residential
Rural District
NA this provision is not applicable [in this case] to this use in this zoning district.
Dimensional Requirements
Land Use Districts
Village District
Rural District
Minimum Lot Area (sq. ft.) [acres(A)]*
With public sewer
8,000
[0.18 A]
NA
Without public sewer
20,000
[0.46 A]
43,560
[1 A]
For conservation use, as defined
NA
NA
Minimum Land Area (sq. ft.) [acres(A)] for the
following**
Single family
8,000
[0.18 A]
43,560
[1 A]
Single family with accessory apartment
8,000
[0.18 A]
43,560
[1 A]
Two family
8,000
[0.18 A]
43,560
[1 A]
Multi Family (3 or more dwelling units) (sq. ft.) [acres(A)]
First two dwelling units
8,000
[0.18 A]
43,560
[1 A]
Each additional dwelling unit
0
10,890
[.25 A]
Minimum Continuous Road Frontage (ft.)
75
125
Minimum Apartment Floor Area (sq. ft.)
Accessory, efficiency, or studio apartment
200
One bedroom apartment
400
400
Two bedroom apartment
520
520
19
Dimensional Requirements
Land Use Districts
Village District
Rural District
Three bedroom apartment
640
640
Four bedroom apartment
760
760
Minimum Setbacks (ft.) ***
Front
15
35
Side and rear
5
10
Driveways (side and rear)
0
10
Lot Coverage (percentage)
Maximum structure coverage (percentage)
50
10
Maximum lot coverage (impervious surface and structure
percentage)
70
15
Height (ft.) ****
Maximum building height (feet) (excluding incidental
protrusions such as chimneys, steeples, flagpoles, and
towers that contain no habitable floor area)
35
35
* The minimum area of a mobile home park lot will be 6,500 square feet if served by a public sewer
system, or 12,000 square feet if served by a central, on-site subsurface wastewater disposal system,
or 20,000 square feet if served by individual, on-site subsurface wastewater disposal systems.
** A lot with an existing dwelling unit may have up to two additional dwelling units, either one
additional attached dwelling unit, one additional detached dwelling unit, or one of each. A lot
without a dwelling unit already on it can have up to three units. 30-A M.R.S. § 4364-A.
*** In addition to structures, these setbacks apply to Recreational Vehicles (RVs).
**** Except for a structure approved pursuant to the Wireless Telecommunications Facilities Siting
Ordinance or the Small Wind Turbine Ordinance for North Haven, Maine.
Notes to table:
1. Required frontage - All lots hereinafter created will possess frontage on (1) a public road, or
on (2) a private road.
2. Cul-de-sac frontage - New building lots located at the end of cul-de-sacs or along curves in
a street where the radius of the curve at the front lot line is less than ninety (90) feet, may be
designed so that they have a minimum of thirty five (35) feet of street frontage along the
front lot line, so long as lot width at the location where the principal building is to be
constructed is at least equal to the distance normally required for street frontage in that
district. The lot width will be measured along a line that is parallel to a tangent of the
midpoint of the curve.
20
3. Setback measurements - The front setback along a public road is measured from the nearest
part of a structure to the edge of the pavement, asphalt or other surfacing material, or if
unpaved, from the edge of the driving surface of the road.
Setbacks do not apply to private roadways. All side and rear setbacks will be measured from
the property line to the nearest part of the structure.
Corner lots - The front setback requirement will be observed along all roads abutting the lot.
Structures on abutting lots - Where a proposed structure would be abutted on both sides by
existing structures, either on the same lot or adjoining lots, whose front setbacks are less than
the required setback, the setback of the proposed structure may be reduced to that of the
structure with the greatest front setback.
4. Fresh Pond Watershed Protection District (FPWPD) - For dimensional standards in that
district, please see the Fresh Pond Watershed Protection Ordinance for the Town of North
Haven, Maine.
21
4 PART IV PERFORMANCE STANDARDS
4.1 General Standards
4.1.1 Accessory Dwelling Unit to Single-family Residential Use
A second or "accessory" dwelling unit is defined as a unit within, attached to or sharing a
wall with, or detached from a single-family residence or garage. The accessory dwelling unit
will not be considered an additional dwelling unit for purposes of the minimum lot size
standards. The accessory dwelling unit must meet the following criteria:
1. The principal unit and the accessory dwelling unit will remain under common
ownership.
2. One (1) driveway will service both dwelling units. Two (2) spaces of off-street
parking for the principal dwelling unit must be provided.
3. The accessory dwelling unit will include its own kitchen, full bath, and no more than
three (3) bedrooms. The floor area of the accessory dwelling unit must be at least one
hundred and ninety (190) square feet. The floor area of the accessory dwelling unit
cannot exceed one thousand five hundred (1500) square feet. The accessory dwelling
unit is permitted on a conforming or nonconforming lot of record, provided there is
adequate wastewater disposal, as determined by the Maine State Plumbing Code and
all other dimensional requirements of the District are met.
4.1.2 Access Point - Vehicle
An Access Point is the point of intersection of a driveway, private way, or private road and a
public road. Any Access Point constructed after the adoption of this Ordinance will be in
accordance with the following standards:
1. Avoidance of Hazardous Conflicts. Access Points must be designed and constructed
in such a way to avoid hazardous conflicts with existing turning movements and
traffic flows on and from the public road.
2. Grades. Whenever possible, the maximum grade for a driveway or private road is ten
percent (10%) for the first forty five (45) feet from the edge of the public road.
3. Thereafter, the grade may not exceed fifteen percent (15%) for driveways or private
roads.
4. Drainage must be in accordance with 23 M.R.S.A. § 705, as amended, culverts of
size, and type as determined by the Road Commissioner, Code Enforcement Officer,
or the State. They must be installed and must adequately protect the road to control
erosion and runoff with best management practices.
5. New access points on Town roads require prior approval by the Road Commissioner
and Code Enforcement Officer (CEO) who will certify that all standards in this
section are met and set the standards for which proper drainage surrounding the road
will be achieved.
4.1.3 Agricultural Management Activities
Agricultural practices will be conducted in such a manner as to prevent soil erosion,
sedimentation, and contamination or nutrient enrichment of surface waters. Refer to Maine
Department of Agriculture, Conservation, and Forestry (DACF) Best Practices Manual.
22
4.1.4 Air Pollution
Air pollution control and abatement will comply with applicable minimum Federal and State
requirements.
4.1.5 Archaeological and Historic Resources
If any portion of the development site has been identified as containing historic or
archaeological resources, the development project will be required to submit inspection
reports performed by qualified professionals and the development project will be altered in
such ways as to protect any discovered resources to the maximum extent practicable
including, but not limited to, site design, timing of construction, extent of excavation, design
of the site, and limiting the extent of excavation.
4.1.6 Buildings/Structures/Premises
All buildings, structures, and parts thereof permitted under this ordinance will not present a
hazard to public health or safety as determined by the Fire Chief or Code Enforcement
Officer, in accordance with State Statutes.
4.1.7 Campgrounds
Campgrounds will conform to the minimum requirements imposed under State licensing
procedures and the following (in cases of possible conflict, the stricter rule will apply) please
see 22 M.R.S.A. §§ 2491 to 2501:
1. Campgrounds will be allowed on parcels of no less than one (1) acre and will contain
a minimum of five thousand (5,000) square feet of land, not including roads and
driveways, for each site. Land supporting wetland vegetation and land below the
normal high-water line of a water body will not be included in calculating land area
per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility
and service buildings will be set back a minimum of fifty (50) feet from any property
line or public road.
3. Mobile homes, cabins, or similar permanent dwellings are prohibited. No recreational
vehicle will be stored within the campground.
4. All water-carried sewage will be disposed of by means of an approved sewage
disposal system which is constructed and operated in conformance with applicable
state and local laws, ordinances, and regulations. Facilities must be in conformance
with the Maine Subsurface Wastewater Disposal Rules 144A CMR 241.
5. All recreational vehicles will discharge their sewage at an approved sewage disposal
site.
6. All outhouses must be approved by the Licensed Plumbing Inspector (LPI).
4.1.8 Clearing of Trees/Vegetation
For cutting in the Shoreland District, please refer to the Shoreland Zoning Ordinance. In all
other Districts, an application for a permit must be submitted to the CEO before trees are
clear cut on an area of one (1) to two and one half (2.5) acres. For clear cutting on greater
than two and one half (2.5) acres, a written plan will be obtained from a professional forester
registered in the State of Maine and filed with the Code Enforcement Officer endorsing the
23
clear cut and prescribing steps and a timetable for the revegetation of the land to minimize
erosion and fire danger. The plan will be carried out by the property owner according to the
timetable in the plan.
4.1.9 Erosion and Sedimentation Controls/Stormwater Management
All new construction and development will be designed to minimize stormwater runoff from
the site in excess of the natural pre-development conditions. Where possible, existing natural
runoff control features, such as berms, swales, terraces, and wooded areas will be retained in
order to reduce runoff and encourage infiltration of stormwaters.
Storm water runoff control systems will be maintained as necessary to ensure proper
functioning.
The following measures relating to conservation, erosion, and sediment control will be
included where applicable as part of all projects submitted for review and approval under this
Ordinance.
1. The Planning Board may require the applicant to have an erosion and sedimentation
control plan prepared by a licensed professional civil engineer or certified
professional in erosion and sediment control, in accordance with the Maine Erosion
and Sediment Control Handbook for Construction: Best Management Practices,
latest revision, Maine Department of Environmental Protection. The Planning Board
may require the review and endorsement of this plan by the Soil and Water
Conservation District.
2. Regardless of whether an erosion and sedimentation control plan is required, erosion
of soil and sedimentation of watercourses and water bodies will be minimized by
employing the following best management practices:
a. Stripping of vegetation, soil removal, re-grading, or other development will be
done in such a way as to minimize erosion.
b. Development will preserve outstanding natural features, keep cut-fill operations to
a minimum and ensure conformity with topography so as to create the least
erosion potential and adequately handle the volume and velocity of surface water
runoff.
c. The development will retain surface water runoff on the site to the greatest extent
possible, and will not unreasonably increase the rate or volume of surface water
runoff from the proposed site.
d. Whenever feasible, natural vegetation will be retained, protected, and
supplemented.
e. The disturbed area and the duration of exposure will be kept to a practical
minimum.
f. Disturbed soils will be stabilized as quickly as practicable.
g. Temporary vegetation or mulching will be used to protect disturbed areas during
development.
h. Permanent (final) vegetation and mechanical erosion control measures in
accordance with the provisions of the Department of Environmental Protection's
Best Management Practices for Erosion and Sedimentation Control or the Maine
24
Soil and Water Conservation Commission will be installed as soon as practicable
after construction ends. The use of native plant species is preferred.
i. Until the disturbed area is stabilized, sediment in the runoff water will be trapped
by the use of debris basins, silt traps, or other acceptable methods.
j. The top of the cut or the bottom of a fill section will not be closer than ten (10)
feet to an adjacent property, unless otherwise specified by the Planning Board.
k. During grading operations, dust control will be employed wherever practicable.
l. Whenever sedimentation is caused by stripping vegetation, regrading, or other
development, it will be the responsibility of the developer causing such
sedimentation to remove it from all adjoining surfaces, drainage systems, and
watercourses, and to repair any damage at the developer's expense as quickly as
possible.
m. Maintenance of drainage facilities or watercourses originating on and completely
on private property is the responsibility of the owner to the point of open
discharge at the property line or at a communal watercourse within the property.
4.1.10 Fences
In all zoning districts, when a new fence is built, or an existing fence is replaced, and it is
designed to have a finished face, the finished face is to be erected towards the nearest
abutting property. For details see MRSA Title 30-A chapter 133.
4.1.11 Flood Hazard Area
When any part of a development is located in a Flood Hazard Area as identified by
the Federal Emergency Management Agency (FEMA), and by the locally adopted Floodplain
Management Ordinance (when adopted), the plan will indicate that all principal structures
on lots in the development will be constructed with their lowest floor, including the
basement, at least one foot above the one-hundred (100) year flood elevation.
4.1.12 Fresh Pond Watershed Protection District
(See the Fresh Pond Watershed Protection District Ordinance).
4.1.13 Home Occupation
Home Occupations will be allowed as a business, profession, occupation, or trade conducted
for gain or support and located entirely within a residential building, in which the use is
accessory, incidental, and secondary to the use of the building for dwelling purposes, and
which does not change the residential character or appearance of the building and property.
They will conform to the following standards:
1. There may be the equivalent of two (2) full-time onsite workers from outside of the
immediate family-in-residence.
2. All exterior storage of materials will be screened from public roads by fences and/or
by vegetation, so that the residential appearance of the property is maintained.
3. Objectionable conditions such as noise, vibration, smoke, dust, electrical disturbance,
odors, heat, or glare will not be permitted.
25
4. Home occupations that involve use or storage of hazardous or leachable materials in
excess of normal residential use will not be permitted.
5. In addition to the off-street parking provided to meet the normal requirements of the
dwelling, adequate off-street parking will also be provided for the vehicles of the
maximum number of users the home occupation may attract during peak operating
hours including customers and clients. On-street parking will not be allowed.
Uses or Activities that do not meet these home occupation standards will be considered as
Commercial, Industrial, or Institutional Uses or Activities and will be reviewed under those
applicable provisions of this Ordinance.
4.1.14 Junkyards/Automobile Graveyard/Automobile Recycling Facilities
Junkyards, automobile graveyards, and automobile recycling businesses, whether new or
existing, will be regulated by 30-A M.R.S.A. § 3754 et seq., as amended.
4.1.15 Lighting Design Standards (Commercial Use)
All exterior lighting will be designed to minimize adverse impact on neighboring
properties. The applicant will demonstrate that the proposed lighting is appropriate for the
intended use. The Planning Board, or when applicable, the Code Enforcement Officer, will
consider the hours of operation, rural characteristics of the neighborhood, and the specific
activities proposed in making its determination.
All exterior lighting will conform to the following standards:
1. The maximum height of freestanding exterior lights will not exceed fourteen (14)
feet including the base.
2. Exterior lights will be downward full cutoff luminaires (Title 5 M.R.S.A., Section
1769) that allow no direct light emissions above a horizontal plane through the
luminaires lowest light-emitting part.
3. When lighting is not in use, lighting will be turned down to security level or turned
off.
4.1.16 Livestock
The following land size requirements apply to keeping livestock:
1. One (1) Acre or More: Animals incidental to residential activities may be kept;
provided, however, that animals such as horses, cattle, goats, sheep, llamas, pigs,
turkeys, ducks, roosters or more than a total of twelve (12) hens and/or rabbits will
not be kept on a premise having a lot area less than one acre, and will be kept no
closer than twenty (20) feet to any property line. Adequate fencing should be
provided to keep animals on the property.
2. Eight Thousand (8,000) square feet to One Acre: No more than twelve small animals
such as hens and/or rabbits may be kept incidental to residential activities. Roosters
are not allowed unless they are in the rural district. Housing and pens will meet a
minimum setback requirement of ten (10) feet. Adequate fencing should be provided
to keep animals on the property.
3. Less than eight thousand (8,000) square feet: no livestock allowed.
26
4.1.17 Lodging Facilities
General Requirements
1. Off-street parking will be provided in accordance with this ordinance. Public parking
will not be used to meet this requirement.
2. Room size will be a minimum of one hundred and twenty (120) square feet for every
two (2) people.
3. There will be a minimum of one (1) complete bathroom for each three (3) rooms, six
(6) persons, or fraction thereof. Bathroom area will not be included in the room area
calculation.
The Planning Board may require other conditions. There will be a maximum of fifteen (15)
rooms per lodging facility.
4.1.18 Lot Divided by Road
In all zoning districts, including all districts set forth in the Shoreland Zoning Ordinance,
land on opposite sides of a public or private road including a public easement as defined in
Title 23 MRSA § 3655, will be considered each a separate lot unless such road was
established by the owner of land on both sides thereof after September 22, 1971.
4.1.19 Manufactured Housing
Refer to the manufactured housing standards in 30-A M.R.S. § 4358
4.1.20 Mineral Exploration and Extraction
All exploration/extraction activities, including test pits and holes, will be capped, refilled, or
secured by other equally effective measures so as to reasonably restore disturbed areas and to
protect the public health and safety. No portion of any ground area disturbed by the
extraction activity will be closer than seventy-five (75) feet from the edge of a public road.
Requires a site-plan review.
4.1.21 Manufactured/Mobile Home Parks
The following provisions will apply to all permitted manufactured/mobile home parks:
1. Except as stipulated in this ordinance, all manufactured/mobile home parks will
conform to all applicable state laws and the provisions of the Subdivision Ordinance.
Where provisions of this ordinance conflict with the specific provisions of the
Subdivision Ordinance; the more restrictive provisions will prevail if such provisions
are consistent with 30-A M.R.S. § 4358(3).
2. Lots served by individual subsurface wastewater disposal systems will be approved
by the Local Plumbing Inspector; lots served by central subsurface wastewater
disposal systems will use a system approved by the Maine Department of Health and
Human Services.
4.1.22 Multi-Family Dwellings
1. Conversions: A single-family dwelling or other building may be converted to a multi-
family dwelling, provided:
27
a. If not connected to a public or private sewerage system, the lot must contain
sufficient area and suitable soil conditions for on-site disposal in accordance with
the Maine State Plumbing Code.
b. The conversion plan must be reviewed and approved by the plumbing inspector
pursuant to 30-A M.R.S.A. § 4211 and the state subsurface wastewater disposal
rules.
c. Each dwelling unit will have its own full bathroom and kitchen facilities and no
dwelling unit will share these facilities with any other dwelling unit.
d. No building will contain more than six (6) dwelling units.
e. Off-street parking space is required.
2. New Construction: Multi-family dwelling units will conform to all of the dimensional
requirements of the district:
a. No building will contain more than six (6) dwelling units.
b. All units will be connected to a common water supply and distribution system,
either public or private.
c. All units will be connected to a public sewerage system, if available, or to a
central collection and treatment system in accordance with the Maine State
Plumbing Code.
d. No parking area will be located within ten (10) feet of any lot line.
e. The division of a new or existing structure into three (3) or more dwelling units
within a five (5) year period is subject to site plan review but is exempt from
subdivision review pursuant to 30-A M.R.S. § 4402(6).
4.1.23 Off-street Parking/Loading
In all new construction, alterations, and changes of use, there will be provided off-street
parking and loading space adequate for their use. The following minimum number of spaces
will be provided and maintained in case of new construction, alterations, and changes in use:
28
Table 4.1.23.1: Minimum Parking Space Requirements
Use
Minimum Parking Space Requirements
Residential
dwellings
Two (2) parking spaces for each dwelling unit.
Short-term
accommodations
Bed and Breakfast accommodations, motels, hotels, boarding
houses, and inns with ten (10) rooms or less: two (2) parking
spaces plus one (1) space for every two (2) guest rooms. Motels,
hotels, boarding houses, and inns with more than ten (10) rooms:
one (1) parking space for every two (2) guest rooms plus one (1)
space for each three (3) employees per shift.
Schools
Two (2) parking spaces for each classroom plus one (1) space for
each two (2) employees per shift.
Theaters,
churches, other
public assembly
places
One (1) parking space for every five (5) seats or one (1) parking
space for every one hundred fifty (150) square feet.
Retail stores
One (1) parking space for every three hundred (300) square feet of
retail area, plus one (1) parking space for every two (2) employees,
unless public parking is provided.
Restaurants,
eating, or drinking
establishments
One (1) parking space for every eight (8) seats, plus one (1)
parking space for every two (2) employees per shift, unless public
parking is provided.
Professional
offices and public
buildings
One (1) parking space for every three hundred (300) square feet of
gross leasable area, exclusive of cellar and bulk storage areas,
unless public parking is provided.
Industrial
One (1) parking space for every two (2) employees per shift, based
on the highest expected average employee occupancy, plus visitor
and customer parking to meet the needs of specific operations.
Table Notes:
1. On-street or on-lawn parking will not qualify as a required space.
2. A minimum of ninety (90) square feet is required for an automobile and one hundred
ninety (190) square feet for a pickup truck, exclusive of maneuvering space, will be
considered as one (1) off-street parking space.
3. Adequate spaces will be provided to accommodate customers, patrons, and
employees at other permitted sites not specified.
29
4. No required parking space will, for the purposes of this Ordinance, serve more than
one (1) type of use.
5. In any District where permitted or allowed, commercial or industrial uses will
provide, as necessary, off-street loading facilities located entirely on the same lot as
the building or use to be served so that trucks, trailers, and containers will not be
located for loading on any public way.
6. The Planning Board may, at its sole discretion, increase or decrease the above parking
requirements in the Downtown Village District, depending upon individual applicant
circumstances. An applicant requesting a deviation from the above standards must
demonstrate to the satisfaction of the Planning Board that the request is appropriate to
the planned use.
Use
Minimum Parking Space Requirements
Residential
Two (2) parking spaces for each dwelling unit.
Retail/commercial/
agricultural/civic
One (1) parking space for every three hundred (300) square feet of
area, plus one (1) parking space for every two (2) employees,
unless public parking is provided.
Industrial/heavy
commercial
One (1) parking space for every two (2) employees per shift, based
on the highest expected average employee occupancy, plus visitor
and customer parking to meet the needs of specific operations.
4.1.24 Ponds
Ponds created for any purpose must meet the specifications of the DEP or the University of
Maine Soil and Water Conservation Commission. If a pond is to be used for the purpose of
fire prevention, the local Fire Chief must approve location and design.
4.1.25 Private Way
In cases where Subdivision approval is not required, private way approval by the Code
Enforcement Officer may allow for the creation of back lots which otherwise would not have
adequate frontage in accordance provided the following provisions are met:
1. A plan shall be prepared by a registered professional land surveyor. The plan shall be
labeled "Plan of a Private Way" and shall provide an approval block for the signatures
of the Code Enforcement Officer. The plan shall be drawn to scale, shall delineate the
proposed private way and the boundaries of each of the lots to be served by or
abutting the private way.
2. Roads shall be designed so as not to be subject to seasonal flooding or washout and
not to disturb wetlands. Drainage ditches and culverts shall be provided wherever
appropriate. A street plan, cross section, and drainage plan shall be submitted for each
private way serving two (2) or more lots.
30
3. The plan shall note that the Town of North Haven will not be responsible for the
maintenance, repair, or plowing of the private way, and that no additional dwelling
units or lots may be served by the private way without prior approval in accordance
with this subsection.
4. If the private way is to provide access to two (2) or more lots, a maintenance
agreement shall be required and recorded in the Knox County Registry of Deeds. The
maintenance agreement shall specify the rights and responsibilities of each lot owner
with respect to the maintenance, repair, and plowing of the private way.
5. Private ways shall comply with the following minimum standards.
Number of Lots Served
1
2
3 or more
Minimum roadway width (ft)
12
15
In accordance with street design
standards in Subdivision
Ordinance
Turnaround at dead end
Circle or T
Right of way width (ft)
25
33
6. One (1) turnout to provide space for two (2) vehicles to pass shall be provided for
every five hundred (500) feet of the private way.
7. Visibility: The private way shall not cause a hazard to pedestrian or vehicular traffic.
8. No more than one (1) private way is to be allowed over a given front lot to serve back
lots.
9. Any waiver requires Planning Board approval.
10. Approval by the Code Enforcement Officer is required for private ways serving one
(1) or two (2) lots. For private ways serving more than two (2) lots, approval of the
Planning Board is required.
11. The plan and/or deed description of the private right of way shall be recorded in the
Knox County Registry of Deeds within ninety (90) days of the date of approval. If it
is not recorded within this time period, the approval shall be null and void.
12. Any change, such as the subsequent creation of another lot, shall require prior
approval as applicable under this subsection.
13. Approved private ways must be constructed and used by the time any of the lots to be
served is developed.
4.1.26 Signs
In all districts, the use of signs will be governed by the following provisions and do not
require a permit.
1. Signs relating to goods and services sold on the premises will be permitted, provided
such signs will not exceed two (2) signs per premises, and will not exceed ten (10)
31
square feet each in area (including the frame) in all districts. Directional signs will be
permitted, provided such signs will not exceed two (2) square feet in area (including
the frame). Billboards and signs relating to goods and services not rendered on the
premises will be prohibited.
2. Name signs of family living on premises will be permitted, provided such signs will
not exceed two (2) signs per premises and providing that no such sign exceeds two
(2) square feet in area (including the frame).
3. One (1) temporary sign on residential property may be displayed not over four (4)
square feet in area (including the frame).
4. Property signs will be permitted without restriction as to the number provided that no
such sign will exceed two (2) square feet in area (including the frame).
5. No sign will extend higher than ten (10) feet above the ground.
6. Signs may be illuminated only by shielded, non-flashing lights.
7. Off-premises signs are permitted pursuant to 23 MRSA § 1901 et seq.
8. On-premises signs, including information kiosks, bulletin boards, and notice boards,
are permitted. These shall not exceed thirty two (32) square feet in area (including the
frame).
9. Temporary signs are permitted and will not exceed six (6) square feet in area
(including the frame).
4.1.27 Subdivisions
See separate current Subdivision Ordinance for North Haven, Maine.
4.1.28 Swimming Pools
Swimming pools will meet the same setback requirements as residential structures. Water
source requires approval by the CEO. The CEO may require that an off-site water source be
used to fill and maintain swimming pools.
4.1.29 Topsoil and Vegetation Removal During Construction
Topsoil will be considered part of the development and will not be removed from the site
except for surplus topsoil from roads, parking areas, and building excavations.
4.1.30 Towers, Wireless Communications
Please see the current Wireless Telecommunications Facilities Siting Ordinance for the Town
of North Haven.
4.1.31 Water Usage and Water Quality
Any proposed use or activity will have sufficient water available for reasonably foreseeable
needs of the development including, but not limited to, potable water and fire control water
and will not alone or in conjunction with other activities adversely affect the quality or
quantity of the groundwater available to abutting properties or to public water supply
systems.
Applicants whose projects involve on-site water supply or sewage disposal systems with a
capacity of two thousand (2,000) gallons per day or greater must demonstrate that the
32
groundwater at the property line will comply, following development, with the standards
for safe drinking water as established by the State of Maine.
All aspects of the project must be designed so that:
1. No person will locate, store, discharge, or permit the discharge of any treated,
untreated, or inadequately treated substance(s) that may cause contamination of soil,
groundwater, or shorelands.
2. All storage facilities for fuel, chemicals, chemical or industrial wastes, and
biodegradable raw materials, must meet the standards of the Maine Department of
Environmental Protection and the State Fire Marshal's Office.
3. If the project is located within the watershed of a "body of water most at risk from
development" as identified by the Maine Department of Environmental Protection
(DEP), the project must comply with the standards of the DEP with respect to the
export of total suspended solids and/or phosphorus.
4.1.32 Wind Energy System
See current Wind Tower Ordinance for the Town of North Haven, Maine
33
5 PART V ADMINISTRATION AND ENFORCEMENT
5.1 Land Use Permits
No person may construct, expand substantially, establish, or re-establish a land use not in existence
on the date this Ordinance (or subsequent amendments) becomes effective without first obtaining
required land-use permits granted by the Code Enforcement Officer or the Planning Board. No land-
use permit will be issued except in conformity with the provisions of this Ordinance. A land-use
permit, secured under the provisions of this Ordinance, will expire if the work or change is not
commenced within one (1) year of the date on which the permit is granted.
5.2 Application for Land-use Permit
Applications for land-use permits can be obtained at the Town Office, from the Code Enforcement
Officer (CEO), or online at the Town of North Haven website. A complete application will be filed
in writing with the Code Enforcement Officer. The CEO will inform the applicant if the application
is incomplete or requires further review within fourteen (14) days of receiving an application. The
CEO will outline specific areas of incomplete information, including any separate applications and
actions to be taken by the Planning Board and/or other agencies, as may be required to complete the
application.
5.3 Authority for Application Review
The following are local administering agencies.
5.3.1 Code Enforcement Officer
The Select Board will appoint a Code Enforcement Officer and fix their salary and expense
provisions. The Code Enforcement Officer will:
1. Approve or deny applications to the extent that Planning Board or other agency
review is not required, either by this Ordinance or by other prevailing law. Approval
will be granted only if the proposed use(s) and/or improvements are in conformance
with the provisions of this Ordinance.
2. Enforce the provisions of this Ordinance. If the Code Enforcement Officer finds that
any provision of this Ordinance is being violated, he or she will notify in writing the
person responsible for such violation(s), including illegal uses of land, buildings, or
structures; or work being done on illegal structures; and will take action to order the
abatement of such violation(s). A copy of such notices and orders will be submitted to
the municipal officers and be maintained as a permanent record.
3. Enforce conditions of approval. For uses and structures permitted by authority of the
Planning Board, including Conditional Use, Site Plan, and Subdivision approvals, the
Code Enforcement Officer will address any non-compliance with conditions of
approval in the same manner as other violations.
4. Keep a complete record and submit a monthly report to the Planning Board of all
essential transactions of the office, including applications submitted; permits granted
or denied; variances granted or denied by the Board of Appeals; revocation actions,
revocation of permits, appeals, court actions, records of complaints received whether
in writing or otherwise; complaints investigated; violations found; and fees collected.
34
5.3.2 Planning Board
The Planning Board of the Town of North Haven is hereby designated as the Planning Board,
heretofore established in accordance with Article VIII, Pt. 2, Section 1, of the Maine
Constitution and Title 30-A M.R.S.A., Section 3001. The Planning Board will be elected by
the Town of North Haven.
1. The board will consist of five (5) members and the term of each member will be three
(3) years.
2. The Planning Board will approve, approve with conditions, or deny those applications
on which it is empowered to act as stated in this Ordinance, other local ordinances,
and other prevailing law. Approval will be granted only if the proposed use(s) or
improvements are in conformance with the provisions of local ordinances and other
prevailing law.
3. The election of officers, conduct of meetings, and other matters of procedure will be
decided in conformance with duly approved bylaws of the Planning Board.
4. An appeal from the Planning Board's final decision concerning the approval or denial
of a conditional use permit, the approval or denial of a subdivision application, and
the approval or denial of a site plan review application may be filed by any person
aggrieved by that decision pursuant to Section 5.3.3 of this Ordinance.
5.3.3 Board of Appeals
The Board of Appeals for the Town of North Haven is hereby designated as the Board of
Appeals, heretofore established in accordance with Article VIII, Pt 2, Section 1 of the Maine
Constitution and with Title 30-A M.R.S.A., Sections 2691 and 4353.
1. The Appeals Board will consist of five (5) members and each member will serve for a
term of three (3) years. One (1) member will be elected each year at Town Meeting.
Annually, the Board shall select a Chair and Vice Chair from its membership.
A quorum of the Board members to conduct an official Board meeting shall consist of
a majority of the Board members. All additional matters involving the organization and
government of the Board of Appeals shall be in accordance with the Board of Appeals
Bylaws.
2. Variances.
A. Undue Hardship Variance. The Board of Appeals may authorize a variance for lot
size, height, lot coverage by structures, frontages, and setbacks. A variance may be
granted by the Board only where strict applications of this Ordinance, or a provision
thereof, to the petitioner and their property would cause undue hardship. The words
undue hardship mean:
a. The land in question cannot yield a reasonable return unless a variance is granted;
b. The need for a variance is due to the unique circumstances of the property and not
to the general conditions in the neighborhood;
c. The granting of a variance will not alter the essential character of the locality; and
d. Hardship is not the result of action taken by the applicant or prior owner.
35
B. Practical Difficulty Variance. The Board of Appeals may authorize a variance for
lot area, lot coverage, frontage, and setback requirements when strict application of the
ordinance to the petitioner and the petitioner's property would cause a practical difficulty
and when the following conditions exist:
a. The need for a variance is due to the unique circumstances of the property and not
to the general condition of the neighborhood;
b. The granting of a variance will not have an unreasonable negative effect on the
use or market value of abutting properties;
c. The practical difficulty is not the result of action taken by the petitioner or a prior
owner;
d. No other feasible alternative to a variance is available to the petitioner;
e. The granting of a variance will not unreasonably adversely affect the natural
environment;
f. The property is not located in whole or in part within shoreland areas as described
in Title 38, Section 435.
As used in this subsection, "practical difficulty" means that the strict application of the
ordinance to the property precludes the ability of the petitioner to pursue a use permitted
in the zoning district in which the property is located and results in significant economic
injury to the applicant.
C. Disability Variance, Vehicle Storage. A disability variance may be granted pursuant
to this subsection.
a. The board may grant a variance to an owner of a dwelling for the purpose of
making that dwelling accessible to a person with a disability who resides in or
regularly uses the dwelling. The board shall restrict any variance granted under
this paragraph solely to the installation of equipment or the construction of
structures necessary for access to or egress from the dwelling by the person with
the disability. The board may impose conditions on the variance granted pursuant
to this paragraph, including limiting the variance to the duration of the disability
or to the time that the person with the disability lives in the dwelling. For the
purposes of this paragraph, the term "structures necessary for access to or egress
from the dwelling" is defined to include railing, wall, or roof systems necessary
for the safety or effectiveness of the structure.
b. The board may grant a variance to an owner of a dwelling who resides in the
dwelling and who is a person with a permanent disability for the construction of a
place of storage and parking for a noncommercial vehicle owned by that person
and no other purpose. The width and length of the structure may not be larger than
two (2) times the width and length of the noncommercial vehicle. The owner shall
submit proposed plans for the structure with the request for the variance pursuant
to this paragraph to the board. The person with the permanent disability shall
prove by a preponderance of the evidence that the person's disability is
permanent. For purposes of this paragraph, "noncommercial vehicle" means a
motor vehicle as defined in Title 29-A, Section 101, Subsection 42 with a gross
vehicle weight of no more than six thousand (6,000) pounds, bearing a disability
registration plate issued pursuant to Title 29-A, Section 521 and owned by the
person with the permanent disability.
36
The board may impose conditions on the variance granted pursuant to this subsection. All
medical records submitted to the board and any other documents submitted for the
purpose of describing or verifying a person's disability are confidential. For purposes of
this subsection, "disability" has the same meaning as a physical or mental disability under
Title 5, Section 4553-A.
D. Set-back Variance for Single-family Dwellings. The board may grant a set-back
variance for a single-family dwelling only when strict application of the zoning ordinance
to the petitioner and the petitioner's property would cause undue hardship. The term
"undue hardship" as used in this subsection means:
a. The need for a variance is due to the unique circumstances of the property and not
to the general conditions in the neighborhood;
b. The granting of a variance will not alter the essential character of the locality;
c. The hardship is not the result of action taken by the applicant or a prior owner;
d. The granting of the variance will not substantially reduce or impair the use of
abutting property; and
e. That the granting of a variance is based upon demonstrated need, not
convenience, and no other feasible alternative is available.
A variance under this subsection is strictly limited to permitting a variance from a set-
back requirement for a single-family dwelling that is the primary year-round residence of
the petitioner. A variance under this subsection may not exceed 20% of a set-back
requirement and may not be granted if the variance would cause the area of the dwelling
to exceed the maximum permissible lot coverage. An ordinance may allow for a variance
under this subsection to exceed 20% of a set-back requirement, except for minimum
setbacks from a wetland or water body required within shoreland zones by rules adopted
pursuant to Title 38, Chapter 3, Subchapter I, Article 2B, if the petitioner has obtained the
written consent of an affected abutting landowner.
E. Variance Recorded: If the Zoning Board of Appeals grants a variance, a certificate
indicating the name of the current property owner, identifying the property by reference
to the last recorded deed in the chain of title, and indicating the fact in the variance,
including any conditions on which the variance has been granted and the date of the
granting, shall be prepared in recordable form.
3. Administrative Appeals: The Board of Appeals shall hear and decide appeals where it is
alleged that there is an error in any order, requirement, decision, or determination made
or failure to act by the Code Enforcement Officer or the Planning Board in the
administration of this Ordinance. An appeal must be filed within thirty (30) days of the
decision of the Code Enforcement Officer or the Planning Board. The Board reviews
appeals from decisions of the Code Enforcement Officer on a de novo basis, meaning to
say it will require an evidentiary hearing before the Board of Appeals and the Board will
make its own independent record and judgment. The Board reviews appeals from
decisions of the Planning Board on an appellant basis, meaning the Board will review the
decision for any abuse of discretion, errors of law, or findings not supported by
substantial evidence in the Planning Board record.
37
An administrative appeal includes an appeal to affirm, modify, or set aside the action of
the Code Enforcement Officer in issuing stop-work orders, revocation of permits, notices
of violation of this Ordinance, and other similar actions when it is alleged that such action
is based on an error of the Code Enforcement Officer in concluding that there has been a
violation of the Land Use Ordinance by any person, noncompliance with building
permits, or other sufficient cause under the Land Use Ordinance. This appeal shall be de
novo requiring an evidentiary hearing.
4. The Board of Appeals will hold a public hearing on an administrative appeal or a request
for a variance within thirty-five (35) days of its receipt of a complete written application,
unless this time period is extended by the parties.
5.4 Fees
All application fees for permits will be paid to the Town of North Haven in accordance with the fee
schedule as established by the Select Board of the Town of North Haven. Fees will be for the cost of
processing the permits and will not be refundable regardless of the final decision to issue or deny a
permit. Advertising costs, technical or legal assistance, and associated costs deemed necessary by the
Town for the review of applications will be the responsibility of the applicant.
5.5 Code Enforcement Officer Permit
A permit issued by the Code Enforcement Officer will be required before beginning or undertaking
any of the following activities:
5.5.1 Activities Requiring Code Enforcement Officer Permit
1. Changes of use to any other use as such use is defined in this Ordinance.
2. Schedule of Uses: All applicable Land Use Permit activities as indicated pursuant to
Table 3.6.1 in Land Uses.
3. Flood Hazard Areas: All construction or earth-moving activities or other
improvements within the one hundred (100) year floodplain designated on the Flood
Insurance Rate Maps published by the Federal Emergency Management Agency.
4. New Construction: New construction of buildings or structures.
5. Alteration: Alteration of a building, structure, or land, including cutting, filling, or
delivery of ten (10) or more cubic yards of earth or stone.
6. Placement of Signs: Placement of signs except temporary signs.
7. Moving or Demolition: All buildings or structures that are removed from or moved
onto, or moved within a lot, or demolished.
5.5.2 Procedure
1. Application: All applications for a Code Enforcement Officer Permit will be
submitted to the Town Office, in writing to the Code Enforcement Officer on forms
provided with applicable fees as per a separate fee schedule published by the Select
Board.
2. Submissions: All applications for a Code Enforcement Officer Permit will be
accompanied by a sketch plan, accurately drawn to scale and showing actual
dimensions or distances, and showing:
a. The actual shape and dimensions of the lot for which a permit is sought.
38
b. The location and size of all buildings, structures, and other significant features
currently existing on the lot, as well as all water bodies and wetlands within two-
hundred fifty (250) feet of the property lines.
c. The location and simple plans of new buildings, structures, or portions thereof to
be constructed or any structure to be moved or relocated. More detailed plans are
to be submitted if deemed necessary by the Code Enforcement Officer.
d. The existing and intended use of each building or structure.
e. Where applicable, the location of soil test pits, subsurface sewage disposal
system, parking lots, driveways, signs, buffers, and private wells.
f. Reference to prior approval(s) by the Planning Board and/or Board of Appeals,
including relevant findings and conditions of appeal, if any.
g. Such other information as may be reasonably required by the Code
Enforcement Officer to provide for the administration and enforcement of this
Ordinance.
3. To Whom Issued: No permit will be issued except to the owner of record or their
authorized agent. Written proof of authorization will be required.
4. Compliance with Land Use Ordinance: All activities undertaken pursuant to a permit
issued under this Section will comply with all applicable standards set forth in
Section IV of this Ordinance.
5. Deadline for Decision: The Code Enforcement Officer, within thirty (30) days of
receipt of an application, will
a. Issue the permit, if all proposed construction and uses meet the provisions of the
Ordinance.
b. Deny the application. All decisions of the Code Enforcement Officer will be in
writing.
If, for whatever reason, the Code Enforcement Officer has not issued a decision
within thirty (30) days of receipt of an application, the decision to approve or
deny the application shall be made by the Planning Board. The Planning Board
will place the application on the agenda for its next regularly scheduled meeting
and shall have thirty (30) days from the date it first reviews the application to
reach a decision. The public hearing and notice provisions in Section 5.6.2(10) do
not apply for Planning Board review of applications under this section.
6. Copies: One (1) copy of the application, with the permit or other written decision of
the Code Enforcement Officer, will be returned to the applicant, and one (1) copy,
with a copy of the permit or written decision, will be retained by the Town as a
permanent public record.
7. Posting: The applicant will cause any permit issued to be conspicuously posted at the
work site on the lot on which the activity will occur.
8. Commencement of Work: Activities that are not substantially commenced within
twelve (12) months of the date of issuance of the permit will be subject to a new
application and the permit issued under this Section will be considered void.
Activities may be extended for up to twelve (12) months by the Code Enforcement
Officer, for good cause, if an application for an extension is submitted not later than
thirty (30) days prior to the expiration of the prior permit. Construction and alteration
39
activities on projects for which a permit has been granted under this Section will
substantially commence within twelve (12) months of the date of issuance of the
permit.
9. Appeals: Appeals from decisions of the Code Enforcement Officer may be taken
pursuant to the provisions of this Ordinance.
5.6 Planning Board Permit Review
A permit issued by the Planning Board will be required before beginning or undertaking any of the
following activities:
5.6.1 Activities Requiring Planning Board Permit
1. Schedule of Uses: All applicable Land Use Permit activities as indicated pursuant to
Section 3.6.1, Land Uses, including Site Plan pursuant to Part VII below, and
Subdivision, pursuant to the Town of North Haven Subdivision Ordinance, as
amended. When a development is subject to multiple reviews such as Site Plan,
Conditional Use and/or Subdivision Review, the Planning Board shall conduct a
concurrent review; the project is required to meet the criteria and standards of all
ordinances under review.
5.6.2 Procedure
1. Application: Nine (9) copies of all applications, including written materials and maps
for a Planning Board Permit, will be submitted, with applicable fees as per a separate
fee schedule published by the Select Board, in writing to the Town on forms
provided. In addition, the electronic submission of application materials is also
encouraged. The application must also include the following submission materials
outlined below.
2. Written Statement. A written statement by the applicant will consist of:
a. Evidence by the applicant of title and interest on the land that the application
covers.
b. A description of the proposed uses to be located on the site.
c. Total floor area and footprint of each proposed building and structure and the lot
coverage as defined in the Land Use Ordinance.
d. Summary of existing and proposed easements, restrictions, and covenants on the
property.
e. Method of solid, liquid, chemical, or other waste disposal.
f. Erosion and sedimentation control plan, stormwater drainage control plan, and
soils information.
g. Approximate amount of blasting required, if any, and a disposition plan for
removed materials.
h. If public water and sewer are to be used, written statements from the water utility
and sewer districts may be requested concerning the capacity of the system and
the availability of the utility to provide service to the new development.
i. An estimate of the date when construction will start and be completed.
40
j. List of approvals and permits required by the Office of the State Fire Marshal and
other State and Federal Agencies if applicable.
3. Plan: All applications for a Planning Board Permit hereunder will be accompanied by
a plan, accurately drawn at a scale of not less than one (1) inch equals forty (40) feet,
and showing actual dimensions or distances, and also showing when applicable:
a. Name of applicant, address, phone number, and email address.
b. Address, tax map, and lot number of the parcel or parcels on which the project is
located.
c. Name of proposed development and any land within three hundred (300) feet of
the proposed development in which the applicant has title or interest.
d. Plans drawn to scale detailing total floor area and footprint of each proposed
structure and the lot coverage (refer to definitions).
e. Scale, true north arrow, legend, and a space for dates of any revisions that may be
required.
f. Exact dimensions and acreage of parcel to be built upon. The corners of the parcel
will be located and marked on the ground at the site and will be referenced on the
plan. For any site for which construction or grading is proposed, other than an
enlargement of an existing building or construction of an accessory building, the
Planning Board may require that the site plan include an actual field survey of the
boundary lines of the lot, giving complete descriptive data by bearings and
distances made and certified by a registered land surveyor.
g. Existing and proposed locations and dimensions of any utility lines, sewer lines,
waterlines, easements, drainage ways, and public or private rights-of-way.
h. The size, shape, and location of existing and proposed buildings and other
structures on the parcel, and any structure to be moved or relocated, including use
and proposed use thereof, and setback dimensions from property lines and roads.
i. If the site is to be served by a subsurface wastewater disposal system, a report by
a licensed site evaluator will be provided.
j. Location and dimensions of on-site pedestrian and vehicular access ways, parking
areas, loading and unloading facilities, and design of ingress and egress of
vehicles to and from the site onto public streets.
k. Natural contours at intervals of two (2) feet and final contours at intervals of two
(2) feet, the natural contours to be shown by dashed lines, and the final contours
to be shown by solid lines. Where sufficient detail cannot be shown with two (2)
foot contours, spot evaluations will be required, with existing spot evaluations
shown in parentheses to be distinguishable from final spot elevations. Where
construction will not disturb the entire lot proposed for development, the
requirement to map contours or spot elevations will apply only to those portions
of the lot that will be altered in any way. Downslope from the proposed
alterations, the existing and proposed courses of drainage and the point or points
of discharge from the lot must be delineated.
l. Photos of the project area prior to any site preparation will be submitted with the
map.
m. Signature block with a line for each member of the Planning Board to
memorialize approval and conditions, if any.
41
4. Additional Materials. The applicant will also provide, when applicable:
a. A general description of the project's proposed use or activity,
b. Evidence of the applicant's technical and financial capability to complete the
project as proposed,
c. Copy of property deed, option to purchase, or other documentation to demonstrate
right, title, or interest in the property on the part of the applicant,
d. Copies of existing and proposed easements, covenants, or deed restrictions,
e. Exterior elevation plans of all proposed buildings or building expansions
proposed,
f. A list of all State and Federal permits required for the project and the current
application, approved permits, or approval status of each,
g. Proposed buffering including fences, berms, hedges, trees, and shrubs,
h. Location of existing and proposed pedestrian walkways,
i. Location, intensity, type, size, and direction of all outdoor lighting,
j. Photographs of the site,
k. Expert recommendations, such as from appointed officials regarding capacity of
municipal infrastructure, or consultants assessing potential environmental
impacts.
5. Waiver: The Planning Board may waive any of the submission requirements under
this section based upon a written request of the applicant. A waiver of any submission
requirement may be granted only if the Planning Board makes a finding that the
information is not required to determine compliance with applicable standards of this
Ordinance.
6. To Whom Issued: No permit will be issued except to the owner of record or an
authorized agent. Written evidence of agent authorization will be required.
7. Compliance With Land Use Ordinance: All activities undertaken pursuant to a permit
issued under this Section will comply with all applicable standards set forth in
Section V of this Ordinance.
8. Receipt: Within three (3) business days of the receipt of an application for a Land Use
Permit the Board, or its designee, shall issue a dated receipt to the applicant.
9. On-site Inspection Meeting: The Planning Board may schedule an on-site inspection
meeting, which must be jointly attended by the applicant or an authorized
representative and at least two (2) members of the Planning Board.
10. Public Hearing: Within a maximum of thirty (30) days after the receipt of an
application to the Planning Board for a Land Use Permit, such as applications for Site
Plan or Conditional Use approvals and before taking action thereon, the Planning
Board will hold a public hearing on the application. Notice of said hearing will be
posted at the Town Office Bulletin Boards and on the Town of North Haven website
at least fourteen (14) days in advance of said hearing. A notice of said hearing will be
sent by mail to each landowner within three hundred (300) feet of the parcel involved.
Landowners are defined as those on whom property taxes are assessed. Failure of any
landowner to receive a notice of public hearing will not necessitate another hearing or
invalidate any action of the Planning Board. Responsibility for such notification will
be assumed by the Planning Board. The applicant will bear all associated costs of
42
advertisements and notifications. At this first public hearing, the Planning Board
will hear input from the general public relative to the applicable sections of the
review standards.
11. Planning Board Review: The Planning Board may schedule additional public hearings
to continue its deliberations. Any subsequent public hearings on the application shall
be scheduled with the same procedures for notice to abutters and the public as above.
12. Decision: Within sixty (60) days after the first public hearing, or by continuance to a
later date if mutually agreeable to the applicant and the Planning Board, the Board
will approve, approve with conditions/modifications, or disapprove the application.
13. Correspondence: The Board will inform the applicant of its decision in writing, and in
cases of disapproval or approval with conditions, shall include reasons for such
action. One (1) copy of the application, with the permit or other written decision of
the Planning Board, signed by the Board or its designee, will be returned to the
applicant, and one (1) copy, with a copy of the permit or written decision, will be
retained by the Town as a permanent public record.
14. Appeals: Appeals from decisions of the Planning Board may be taken pursuant to the
provisions of this Ordinance.
5.7 Other Requirements Before Approval
The following requirements shall be considered before approval.
5.7.1 Right, Title, or Interest
Prior to approval of any proposed improvements or changes of use, the applicant shall
furnish appropriate evidence of ownership of the subject property or other legal interest
conferring effective site control.
5.7.2 Multiple Permits
1. The Code Enforcement Officer shall not issue permits for any proposed
improvements or changes of use that are conditioned upon other pending approvals.
Required action(s), if any, by other Local, State, and Federal authorities, such as the
Planning Board's granting of approval and adoption of conditions of approval, must
precede approval(s) by the Code Enforcement Office for the same or related
activities.
2. With the exception of Conditional Use permits, the Planning Board may condition its
approval of any proposed improvements or changes of use upon other pending
approvals by Local, State, and Federal authorities unless State or Federal regulations
require Local approval first.
3. In the case of applications for activities requiring both a Conditional Use permit and
other approvals by the Planning Board, such as Subdivision or Site Plan approvals,
the application for a Conditional Use permit shall be heard and decided first.
5.8 Positive Findings Required
Before issuing any Land Use Permit, the Code Enforcement Officer shall make the following
independent findings in support of the proposed improvements and/or changes of use. The Planning
Board may also refer to this list where Site Plan, Subdivision, or Conditional Use review does not
require substantially that the same findings:
43
1. Are permitted in the district where the subject property is located,
2. Is in conformance with the applicable performance standards of Section IV: Performance
Standards of this Ordinance,
3. Will avoid hazards associated with development in flood prone areas,
4. Will not result in damage to spawning grounds, fish, aquatic life, bird, and other wildlife
habitat,
5. Will conserve significant natural, archaeological, and historical resources, and
6. Will not adversely impact public infrastructure.
5.9 Enforcement
It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance.
5.9.1 Violation
It shall be the duty of the North Haven Code Enforcement Officer to enforce the provisions
of this Ordinance. If the Code Enforcement Officer shall find that any of the provisions of
this Ordinance are being violated, the CEO shall notify by certified mail the person
responsible for such violation, indicating the nature of the violation and ordering
necessary action to correct it within thirty (30) days of the date of the letter. The Code
Enforcement Officer shall order discontinuance of any illegal use of land, buildings,
structures, removal of illegal buildings or structures or additions, alterations or structural
changes thereto, discontinuance of any illegal work being done, and shall take any other
action authorized by the Ordinance to ensure compliance with or to prevent violations of the
provisions of this Ordinance.
5.9.2 Legal Actions
When the above does not result in the correction of the violation, the Select Board, upon
notice from the Code Enforcement Officer, are hereby authorized to institute any and all
actions and proceedings, either legal or equitable, including seeking injunctions and the
imposition of fines, that may be appropriate or necessary to enforce the provisions of the
Ordinance in the name of the municipality.
5.9.3 Fines
Any person who continues to violate any provisions of this Ordinance after receiving notice
of such violation may be liable for a daily civil penalty of a minimum of $250 and a
maximum of $5,000 for each violation. Each day the violation continues will constitute a
separate violation as referenced in Title 30-A M.R.S.A., Section 4452. Under this law, the
violator is liable for fines for each offense, may be ordered to correct or abate a violation, and
may be liable for the Town's attorney's fees, witness fees, and costs.
5.9.4 Liability
Any owner or contractor involved in activities regulated by this Ordinance may be held liable
if required permits have not been obtained or if work performed does not conform to all
conditions of approval of the permit or provisions of this Ordinance.
44
5.10
Validity
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision will not invalidate any other section or provision of this Ordinance.
5.11
Conflict with Other Ordinances
Whenever the requirements of this Ordinance are inconsistent with the requirements of this
Ordinance or any other Ordinance, code, or statute, the more restrictive will apply.
45
6 PART VI CONDITIONAL USES
6.1 Purpose
A Conditional Use may be appropriate within the applicable zoning district but has the potential for
undue impacts on the public health, safety, and welfare; the natural environment; or on municipal
services in the district.
The Planning Board may grant approval for Conditional Uses with such conditions and safeguards as
are appropriate under this Ordinance, or deny applications for Conditional Uses when such proposed
changes of use or improvements do not meet the criteria below.
6.2 Applicability
A Conditional Use Permit may be granted for uses that are not permitted as-of-right, but for which
specific provision is made for such uses within the applicable zoning district, as indicated by a "CU"
notation in the appropriate field(s) in the table at Section 3.6.1.
6.3 Procedure
The applicant shall provide submission materials per Section 5.6 above, as applicable, and any
further documentation, if desired, in support of findings required to be made by the Planning Board
below.
6.4 Criteria
Conditional Use may be granted by the Planning Board only in the event that the applicant has
established to the satisfaction of the Planning Board that neither the proposed use nor the proposed
site upon which the use will be located is of such a character that the use will have significant
adverse impacts upon the value and quiet possession of surrounding properties greater than would
normally occur from such a use in the zoning district. In reaching a determination on this standard,
the Board would consider these criteria:
1. The size of the proposed use compared to the surrounding uses.
2. The intensity of the proposed use, including the amount and type of traffic to be generated,
parking and loading, hours of operation, expanse of pavement, and similar measures of
intensity of use compared with surrounding uses.
3. The potential generation of noise, dust, odor, vibration, glare, smoke, litter, or other
nuisances.
4. Unusual physical characteristics of the site, including the size of the lot, shape of the lot,
topography, and soils which tend to aggravate adverse impact upon surrounding properties.
5. The degree to which landscaping, fencing, and other design elements have been incorporated
to mitigate impacts on surrounding properties.
6. That the proposed use will not create an unreasonable demand for public services,
including, but not limited to, public roads, fire protection, police protection, solid waste
disposal, sewage treatment, public water supplies, schools, public open spaces, and recreation
programs and facilities.
7. That the proposed use would not result in an inordinate amount of pedestrian or vehicle
traffic at or surrounding the site and cause problems regarding emergency vehicle access.
46
6.5 Appeals
Appeals from decisions of the Planning Board regarding the approval, denial, or the placement of
restrictions upon approval, may be made to the Zoning Board of Appeals within thirty (30) days of
the decision of the Planning Board pursuant to Section 5.3.3 of this Ordinance.
6.6 Conditions of Approval
The Board may attach conditions to its approval for a Conditional Use Permit. These conditions may
include, but are not limited to, requirements such as, (a) street improvements, (b) access restrictions,
(c) hours of use, (d) buffering and screening, (e) utility improvements, and (f) performance
guarantees for off-site improvements required as a condition of approval.
6.7 Reapplication
If the Planning Board shall deny a Conditional Use Permit, a second request of a similar nature shall
not be brought before the Planning Board within one (1) year from the date of the first request unless
in the opinion of a majority of the Board, substantial new evidence can be brought forward, or unless
the Board finds that an error of law and misunderstanding of fact has been made, or unless
amendments to the Land Use Ordinance have changed the status, circumstances, and conditions of
the matter which was brought before the Board.
A Conditional Use granted by the Planning Board may be expanded in area or function only with the
granting of a new Conditional Use Permit by the Planning Board.
47
7 PART VII SITE PLAN REVIEW
7.1 Purpose
Substantial development or major changes of use may cause a material impact on the cost and
efficiency of municipal services, public utilities, road systems, and traffic congestion, and may affect
the visual characteristics of neighborhoods and the Town, and the general health, safety, and welfare
of the community. The purpose of this Section is to minimize the potential negative impacts of
development, while maximizing development's positive effects by assessing the impact of new
development on surrounding properties, municipal facilities and services, and the natural
environment.
7.2 Applicability
Only uses that have been recognized as being allowed uses in the applicable zoning district, or as the
result of approval by the Planning Board as a Conditional Use, may proceed to Site Plan review. Site
Plan review is not intended to establish the right of a use, but rather to ensure that, given the
proposed intensity of such use, the proposed improvements are designed and placed on a lot as
appropriate to its surroundings, and comply with applicable technical standards.
A proposal including any of the following will require site plan review and approval:
7.2.1 Commercial Use
The construction or expansion of buildings, including accessory buildings and structures for
commercial use, having a total floor area of one thousand (1000) square feet or more for
commercial use.
7.2.2 Impervious Surface
The creation of one thousand five hundred (1,500) square feet or more of new impervious
area for commercial or multi-family residential use properties.
7.2.3 Vacancy
Commercial occupancy of a building that has been vacant for more than two (2) years.
7.2.4 Change of Use
The conversion of a residential building to a commercial use.
7.2.5 Revised Plans
The Code Enforcement Officer may find that a proposal for significant additional expansion,
improvements, or reconfiguration of a commercial property that is already subject to a prior
Site Plan approval shall require referral to the Planning Board as an amendment to that
previously approved Site Plan.
7.2.6 Expansion of Existing Business
Any significant expansion, improvements, or reconfiguration of a commercial property in
which the intensity of use - as reflected in traffic generated, impacts on municipal services,
the environment, and surrounding neighborhood - will differ in a substantial way from that
of the preceding or existing use.
48
7.3 Procedure
The applicant shall provide a statement addressing potential impacts on neighboring properties and
neighborhood character if the proposed Site Plan is approved, along with other submission materials
per Section 5.6 above, as applicable, and further documentation in support of any findings required
to be made by the Planning Board below.
7.3.1 Pre-Application Meeting
An applicant will request a pre-application meeting with the Planning Board prior to formal
submission of a site plan. The materials submitted must include, but are not limited to, a
written statement defining the proposed project and a Sketch Plan. The Sketch Plan may be a
freehand drawing and will show:
1. The outline of the tract or parcel with estimated dimensions, road rights-of-way and
existing easements.
2. The layout of existing and proposed building(s), driveways, and parking areas.
3. Identification of general areas of steep slopes, wetlands, streams, and floodplains.
4. Estimated calculation of the percent of Lot Coverage (see definition, Appendix A).
7.4 Performance Standards
The following standards are to be used by the Planning Board in judging applications for site plan
reviews and will serve as minimum requirements for approval of the site plan. The site plan will be
approved unless the Planning Board judges that the standards have not been reasonably met. In all
instances, the burden of proof will be on the applicant.
7.4.1 Soils and Erosion Control
The soils on the site will have adequate capacity and stability to support all proposed
development.
1. Filling, excavation, and earth moving activity will be carried out in a way that keeps
erosion and sedimentation to a minimum. The design will include best management
practices that:
a. Preserve and protect the natural vegetation.
b. Keep the duration of exposure of disturbed soils to as short a period as possible
and stabilize the disturbed soils as quickly as practicable,
c. Use temporary vegetation or mulching to protect exposed critical areas during
development.
7.4.2 Vehicle Access
Vehicular access will comply with the access management standards of Section 4.1.3.
7.4.3 Parking and Circulation
The layout and design of all means of vehicular and pedestrian circulation, including
walkways, interior drives, and parking areas, will provide for safe general interior circulation,
separation of pedestrian and vehicular traffic, service traffic, loading areas, and arrangement
of parking areas as presented in Section 4.1.23.
49
7.4.4 Surface Water Drainage
Adequate provision will be made for surface drainage so that removal of storm waters will
not adversely affect neighborhood properties, downstream water quality, soil erosion, or the
public storm drain system. Whenever possible, on-site absorption of run-off waters will be
used to minimize discharges from the site.
7.4.5 Existing Utilities
The development will not impose an unreasonable burden on sewers and storm drains, water
lines, or other public utilities.
7.4.6 Special Features of Development
Exposed storage areas, exposed machinery, installations, service areas, truck loading areas,
utility buildings, and similar structures will have sufficient setbacks and screening to provide
an audio and visual buffer sufficient to minimize their adverse impact on other land uses
within the development area and surrounding properties.
7.4.7 Exterior Lighting
Exterior lighting will meet the provisions of Section 4.1.15.
7.4.8 Emergency Vehicle Access
Provisions will be made for practical and safe emergency vehicle access to all buildings and
structures at all times of the year.
7.4.9 Municipal Services
The development will not have an unreasonable adverse impact on municipal services.
7.4.10 Water Quality
Must comply with Federal and State regulations.
7.4.11 Air Quality
Must comply with Federal and State regulations.
7.4.12 Water Supply
The development has sufficient water available for the reasonably foreseeable needs of the
development and will not cause an unreasonable burden on an existing water supply, if one is
to be used.
7.5 General Provisions
7.5.1 Conformance
All construction performed under the authorization of a land use permit issued under this
section will be in conformance with the approved Site Plan.
50
7.5.2 Expiration
Site plan approval will expire one (1) year after Planning Board approval, unless substantial
work on the approved improvements has begun. Applicants may seek a one (1) year
extension prior to an approved site plan's expiration, unless the ordinance, at the time of
renewal, has changed to such an extent that the previously-approved improvements or change
of use would no longer be permitted.
7.5.3 Technical Review
The Planning Board, after reviewing and finding specific technical deficiencies, may hire its
own civil engineer, soil scientist, geologist, or other expert to review the plan submitted by
the applicant. The applicant will pay for this expense.
7.5.4 Conditions of Approval
The Planning Board may, in order to carry out the purposes of this Section, require
reasonable conditions necessary to protect the public interest and to fit such uses
harmoniously into their neighborhoods. Such conditions of approval will be included in the
land use permits issued by the Planning Board under this section and may be required to be
noted on the Site Plan drawing before it is signed by the Board.
7.5.5 State and Federal Review
The Planning Board's decisions will be made independently of and concurrently with State
and Federal agencies' reviews but may be subject to their stricter requirements.
7.6 Appeals
An appeal of the Planning Board's final decision may be filed by any person aggrieved by that
decision pursuant to Section 5.3.3 of this Ordinance.
51
Appendix A: Definitions
Word Usage
In this Ordinance, certain terms or words will be interpreted as follows:
The word person includes a firm, association, organization, partnership, trust, company,
corporation, municipal, or quasi-municipal corporation, as well as an individual; the present tense
includes the future tense, the singular number includes the plural; and the word may is permissive;
the words uses or occupied include the words intended, designed, or arranged to be used or
occupied; the word building includes the word structure; and the word dwelling includes the word
residence; the word lot includes the words plot or parcel. In case of any difference of meaning or
implication between the text of this Ordinance and any map or illustration, the text will control.
Words used and not otherwise defined in this chapter will have their customary definitions as
defined in any standard college-level dictionary. For purposes of this chapter the singular use of a
word or phrase will include the plural.
In this Ordinance, the following terms will have the following meaning unless a contrary
meaning is required by the context or is specifically prescribed.
Abutting Property - Any lot which is physically contiguous with the subject lot even if only at a
point, and any lot which is located directly across a road or right-of-way from the subject lot such
that the extension of the side lot lines of the subject lot would touch or enclose the abutting
property.
Accessory Dwelling Unit - Means a second dwelling unit within, attached to, or detached from a
single-family residence or garage. A dwelling unit is a room or group of rooms designed and
equipped exclusively for use as living quarters for only one (1) family, including provisions for
living, sleeping, cooking, and eating. See the Performance Standards for additional limitations.
Accessory Structure - A structure which is incidental and subordinate to the principal structure, and
which is detached from the principal structure but located on the same lot. A deck or similar
extension of the principal structure or a garage attached to the principal structure by a roof or a
common wall is considered part of the principal structure. A dwelling unit will not be considered an
accessory structure.
Accessory Use - A use which is clearly incidental and subordinate to the principal use of the lot. An
accessory use, when aggregated with other accessory uses on the same lot, will not subordinate the
principal use of the lot.
Agricultural Products Processing - The manufacturing, handling, treatment, or packing of crops,
livestock, or daily products produced or raised on farms, excluding rendering plants, fertilizer
manufacturing plants, and similar manufacturing operations.
Agriculture - The production, keeping, or maintenance for sale or lease of plants and/or animals,
including but not limited to: forage and sod crops, grains and seed crops, dairy animals and dairy
products, poultry and poultry products, livestock, fruits and vegetables, and ornamental and
greenhouse products. Agriculture does not include forest management and timber harvesting
activities.
52
Aircraft - Any device that is now known or hereafter invented used or designed for navigation of or
flight in the air.
Airport - A place from which aircraft operate that usually has a runway and maintenance facilities
and often serves as a terminal.
Airstrip - Any area of land or water which is used or intended for use for the landing and take off of
aircraft.
Alteration - Any exterior change, addition, or modification in construction other than cosmetic or
decorative, which changes the square or cubic footage of a building.
Appellate Appeal - Procedure applied when the Board of Appeals reviews the decision of the
Planning Board. This appeal is deferential, based on review of the Planning Board decision.
Aquaculture - The cultivation of both marine and freshwater species such as fish, shellfish, and
plants which can range from land-based to open-ocean production.
Archaeological Site - A geographic location of the remains of prehistoric life or of historic human
beings. These include, but are not limited to, structures, artifacts, terrain features, graphics (paintings
or drawings, etc.) and the evidence of plants or animals.
Assisted Living/Residential Care Group Facility - A house or other place that, for consideration,
is maintained wholly or partly for the purpose of providing residents with assisted housing services
or assisted living services. Residential care facilities provide housing and services to residents in
private or semi-private bedrooms in buildings with common living areas and dining areas.
"Residential care facility" does not include a nursing home licensed by the Department of Health and
Human Services or a supported living arrangement certified by the former Department of Behavioral
and Developmental Services, which is now part of the Department of Health and Human Services.
(10-144 Department of Health and Human Services CMR Chapter 110).
Authorized Agent - Anyone having written authorization, signed by the property owner, to act on
behalf of a property owner.
Automobile Graveyard - A yard, field, or other area used as a place of storage, other than
temporary storage, which is not engaged primarily in doing auto body repair work for the purpose of
making repairs to render a motor vehicle serviceable; or three (3) or more unserviceable, discarded,
worn out, or junked motor vehicles as defined in Title 29-A, Section 101, Subsection 42, or parts of
the vehicles.
Automobile Service and Repair Garage - A place where, with or without the attendant sale of
engine fuels, the following services may be carried out: general repair; engine rebuilding; rebuilding
or reconditioning motor vehicles; collision service such as body, frame, or fender straightening and
repair; overall painting; and undercoating of motor vehicles.
Back Lot - A lot that does not have frontage on a road or private way. Back lots are allowed only for
one (1) single-family dwelling or one (1) two-family dwelling. Up to two (2) back lots are allowed.
53
Access to a back residential lot is through a driveway meeting the standards for a driveway as set
forth in this ordinance.
Body of Water - Will include the following:
Pond - Any inland impoundment, natural or manmade, which collects and stores surface water,
and which has a surface area in excess of one-half (1/2) acre.
Great pond - Any inland body of water which in a natural state has a surface area in excess of ten
(10) acres, and any inland body of water artificially formed or increased which has a
surface area in excess of thirty (30) acres except for the purposes of this Ordinance,
where the artificially formed or increased inland body of water is completely surrounded
by land held by a single owner.
Great pond classified GPA - Any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-
A Section 465-A. This classification includes some, but not all impoundments of rivers
that are defined as great ponds.
River, Stream or Brook - A free-flowing drainage outlet that is either perennial or intermittent,
with a defined channel lacking terrestrial vegetation. Also, a perennial free-flowing body
of water where the body of water flows into another water body or wetland within a
shoreland zone.
Tidal Water - All waters affected by tidal action during the maximum spring tide.
Building - Any structure and its attachments such as decks, breezeways, and porches which are
supported by columns or walls for the housing or enclosure of persons, animals, or personal
property, excluding mobile homes.
Campground - Any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles, or other shelters, for which a
fee is charged.
Change of Use - A change from one use to another use, or the addition of a new use to an existing
use. (See Table 3.6.1, Land Uses)
Church - As used in this Ordinance, refers to a place of worship regardless of denomination that is
tax exempt under the Internal Revenue Code.
Code Enforcement Officer (CEO) - A person duly appointed to administer this Ordinance.
Commercial Fishing Activity - The activity of catching or culturing fish and other seafood for
commercial profit.
Commercial Complex - A building with space for more than one (1) commercial operation.
Commercial Use - The use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the buying
54
and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling
units.
Community Living Arrangement - A housing facility for eight (8) or fewer persons with
disabilities that is approved, authorized, certified, or licensed by the State. A Community Living
Arrangement may include a group home, foster home, or intermediate care facility. Disability has
the same meaning as the term handicap in the Federal Fair Housing Act 42 United States Code
Section 3602. Refer to Title 30-A M.R.S.A. Section 4357-A.
Single-Family Use - In order to implement the policy of this State that persons with disabilities are
not excluded by municipal zoning ordinances from the benefits of normal residential surroundings,
any community living arrangement is deemed a single-family use of property for the purposes of
zoning.
Conditional Use - A use permitted only after review and approval by the Planning Board. A use that
is appropriate within a zoning district but that has the potential for undue impacts on the public
health, safety, and welfare; the natural environment; or on municipal services in the district. Such
uses may be allowed if specific provision is made for them within the zoning district.
Conformance - Compliance with standards, rules, or laws.
Conservation Use - Land used for the purposes which include retaining or protecting natural,
scenic, or open space; assuring its availability for agricultural, forest, recreational, or open space use;
protecting natural resources; or maintaining or enhancing air or water quality of real property. To
meet applicable dimensional or area requirements, if any, such use must be on land owned by the
Town and/or overseen by a qualified holder of a conservation easement.
Constructed - Includes built, erected, altered, reconstructed, moved upon, or any physical
operations on the premises which are required for construction including excavation, fill, paving, and
drainage.
Contiguous Lots - Lots which adjoin at any line or point, except that lots on opposite sides of a
public or private road will be each considered a separate tract or parcel unless such road was
established by the owner of land on both sides thereof.
Daycare Center - A facility licensed by the State of Maine for the care or instruction of more than
three (3) preschool-age children exclusive of children who may be living in a home which is serving
as the daycare or nursery school facility. It also includes a facility licensed by the State of Maine for
the care and instruction of adults.
Deck - An open, unroofed porch or platform extending from a structure.
De Novo Appeal - Procedure applied when the Board of appeals reviews the decision of the Code
Enforcement Officer. This appeal is non-deferential to decision of the CEO. The process starts fresh
from the beginning, meaning that it will require an evidentiary hearing before the Board of Appeals.
Dimensional Requirements - Numerical standards relating to spatial relationships, including but
not limited to setback, lot area, shore frontage, road frontage, and height. See Table 3.7.1,
Dimensional Requirements.
55
District - A specified portion of the municipality, delineated on the Official Land Use Map, within
which certain regulations and requirements or various combinations thereof apply under the
provisions of this ordinance.
Driveway - A vehicular access from a public or private way to a structure or use on a lot. The
driveway shall be a maximum of twenty (20) feet in width. A driveway may cross front, side, and
rear setbacks and may be used for parking. A driveway is less than five hundred (500) feet in length
serving two (2) single-family dwellings, or one (1) two-family dwelling, or less.
Dwelling - Any building, structure, or portion thereof designed or used for residential purposes.
Single family - A building containing only one (1) dwelling unit for occupation by not more
than one (1) family.
Two-family (Duplex) - A building containing two (2) dwelling units for occupancy by not
more than two (2) families.
Multi-family - A building containing three (3) or more dwelling units, such as buildings
being designed for residential use and occupancy by three (3) or more families living
independently of each other, with the number of families not exceeding the dwelling
units.
Dwelling Unit - A room or group of rooms designed and equipped exclusively for use as living
quarters for only one (1) family, including provisions for living, sleeping, cooking, and eating. The
term will include manufactured homes and tiny homes (less than four hundred (400) square feet) but
will not include recreational vehicles.
Excavation - Digging and moving earth. Not including stockpiles and work in Town, State or
private pits.
Expansion of a Structure - An increase in the square footage (floor area) or cubic footage (volume)
of a structure, including all extensions such as, but not limited to attached decks, garages, porches,
and greenhouses.
Family - One (1) or more persons occupying a premises and living as a single housekeeping unit.
Fence - A barrier generally constructed near property lines, consisting of rails, timber, stone walls,
iron, wire, or hedges.
Flag Lot - Lots or parcels with less frontage on a public road than is normally required in the district
in which the lot is located. The panhandle is a narrow access corridor to the bulk of the lot or parcel
located behind lots or parcels with normally required road frontage.
Floodplain - Land area susceptible to being inundated by water from any source.
Floor Area - The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, plus the horizontal area of any unenclosed portions of a structure such as porches and
decks.
56
Footprint - The entire area of ground covered by the structures on a premises, including
cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios,
porches, steps, and decks. (MRSA Title 38, Chapter 3, Article 2B, section 436A)
Forest Management Activities - Includes timber cruising and other forest resource evaluation
activities, management planning activities, timber stand improvement, pruning, regeneration of
forest stands, and other similar or associated activities, exclusive of timber harvesting and the
construction, creation, or maintenance of roads.
Fresh Pond Watershed Protection District - consists of that watershed area in which surface and
subsurface waters ultimately flow or drain into Fresh Pond, a public water supply for the Town of
North Haven.
Gravel Pit - A mining operation undertaken primarily to extract and remove sand, fill, rock, or
gravel.
Great Pond - For the purpose of this Ordinance, any inland body of water which has a surface area
in excess of ten (10) acres, Fresh Pond.
Height - The vertical distance between the mean original grade at the downhill side of the structure
and the highest point of the structure, excluding chimneys, steeples, antennas, and similar incidental
protrusions which have no floor area.
Historic Resources - As assigned by the National Historic Preservation Act of 1966, as amended,
that recognizes buildings, sites, districts, structures, and objects significant in American history,
archaeology, architecture, engineering, or culture, and identifies them as worthy of preservation.
Home Occupation - An occupation, profession, or enterprise which is customarily carried on in a
dwelling unit or in a building or other structure, accessory to a dwelling unit, carried on by a person
residing in the dwelling unit, and clearly incidental and secondary to the use of the dwelling unit for
residential purposes. Home Occupation may include retail, professional services, craft industries, etc.
Hospital - An institution licensed by the State of Maine to provide human in-patient medical or
surgical care for the sick or injured, including related facilities such as laboratories, out-patient
departments, training facilities, central service facilities, or staff offices that are an integral part of
the facility.
Impervious Surface - The area covered by buildings and associated constructed facilities; areas that
have been or will be covered by a low-permeability material, such as asphalt or concrete; and areas
such as gravel roads and unpaved parking areas that have been or will be compacted through design
or use to reduce their permeability. Common impervious surfaces include, but are not limited to,
rooftops, walkways, patios, driveways, parking lots, storage areas, concrete or asphalt paving, gravel
roads, packed earthen materials, oil, macadam, or other surfaces that similarly impede the natural
infiltration of stormwater.
Incidental Protrusions - Will mean any structures attached or fixed to a building or structure which
do not exceed more than five (5) percent of the square footage of the building or structure and do
not exceed in height more than twenty (20) percent of the building or structure. Chimneys, antennas,
57
cupolas, towers, or steeples are examples of the type of structures that are usually considered
incidental protrusions. Incidental protrusions will not include living space.
Junkyard - A yard, field, or other area used as a place of storage for discarded, worn out, or junked
plumbing and heating supplies; household appliances and furniture; discarded scrap and junked
lumber; old or scrap copper, brass, rope, rags, batteries, paper trash, rubber or plastic debris, or
waste; all scrap iron, steel, and other scrap ferrous or non-ferrous material; or garbage dumps, waste
dumps, and sanitary landfills.
Land Use - The purpose for which land is intended to be or is used (e.g., inactive, agriculture,
woodlot, dwelling, retail store, marine service).
Light Manufacturing - A manufacturing activity that uses moderate amounts of partially processed
materials to produce items of relatively high value which typically produce smaller consumer goods.
Light manufacturing requires less raw material, space, and power than other manufacturing uses, and
typically causes no pollution.
Livestock - Cattle, horses, sheep, goats, swine, poultry, and similar animals kept for domestic use.
Lodging Facility - A building in which rooms are offered for overnight accommodations, with or
without meals, for compensation. This definition includes motels, hotels, tourist homes, inns, bed
and breakfasts, and boarding houses.
Lot - A parcel of land having distinct and defined boundaries, described in a deed, plot plan, or
similar legal document. Land located on opposite sides of a public or private road, as set forth in
Performance Standard 4.1.18 and with the same limitations therein, will be considered each a
separate lot of land, even though the deed, plot plan, or similar legal document describes the land as
a single lot.
Lot Coverage - The percentage of the lot covered by all buildings, structures, and impervious
surfaces, including but not limited to driveways, walkways, parking areas, and patios.
Lot of Record - A parcel of land, a legal description of which or the dimensions of which are
recorded on a document or map on file in the Knox County Registry of Deeds.
Low Intensity Recreation - A non-commercial use, i.e. hunting, hiking, fishing, picnicking,
swimming, or birding.
Manufactured Homes or Housing - Means a structural unit or units designed for occupancy and
constructed in a manufacturing facility and transported, by the use of its own chassis, to a building
site. (Please see 30-A M.R.S. §4358)
Medical Clinic - A facility for diagnosis and treatment of out-patients. A group practice in which
several physicians work cooperatively, and a facility that offers professional services or
consultations usually at a discounted rate.
Mineral Exploration - Hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
58
Mineral Extraction - Any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location to transport the product removed away from the extraction site. A
reclamation plan must be in place to restore the land to its original condition.
Mixed-use Building - A building that contains at least one (1) portion devoted to allowed
nonresidential uses and at least one (1) devoted to allowed residential uses.
Mobile Home Park - A parcel of land under unified ownership approved by the municipality for the
placement of three (3) or more mobile homes.
Nonconforming Lot of Record - A lot of record prior to the effective date of this Ordinance or
amendment which does not meet the area, frontage, width, or depth requirements of the district in
which it is located.
Nonconforming Structure - A structure which does not meet all of the dimensional requirements of
setback, height, and lot coverage, but which is allowed to remain solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
Nonconforming Use - The use of buildings, structures, premises, land, or parts thereof which is not
allowed in the district in which it is located, or which does not meet the performance standards of
this Ordinance, but which is allowed to remain solely because it was in lawful existence at the time
this Ordinance or subsequent amendments took effect.
Normal High Water Line - That line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water, or changes in vegetation, and which
distinguishes between predominantly aquatic and predominantly terrestrial land. In the case of
wetlands adjacent to great ponds, the normal high water line is the upland edge of the wetlands and
not the edge of the open water, and in the case of land adjacent to tidal waters, the normal high water
line is the maximum spring tide level based upon data from tide tables published by the National
Ocean Service, i.e., 7.5 feet NGVD. (See "coastal wetland.")
Nursing Home/Facility - An institution or a distinct part of an institution which is primarily
engaged in providing skilled nursing care and related services for residents who require medical or
nursing care, rehabilitation services, or health-related care and services above the level of room and
board.
Official Map - This is the Land Use District Map for the Town of North Haven. It defines the
location of the zoning districts.
Parking Lot - An off-street area for more than three (3) cars.
Parking Space - An off-street space enclosed or unenclosed, sufficient in size to store one (1) motor
vehicle together with a driveway connecting the parking space with a street, road, or alley and
permitting ingress and egress of that motor vehicle without the necessity of moving any other motor
vehicle.
59
Performance Standard - A criterion established to control the use of land and structures. The
purpose of performance standards is to provide detailed regulations and restrictions by means of
minimum criteria that must be met by users in order to protect neighbors from adverse impacts of
adjoining land uses and to protect the general health, safety, and welfare of citizens of North Haven.
Planning Board - The Planning Board of the Town of North Haven as created by 30-A M.R.S.A.
Sections 3001, 4311, et. seq.
Principal Structure - The building in which the principal use of the lot is conducted.
Principal Use - The use to which the premises is devoted, and the main purpose for which the
premises exist.
Private Way - A privately owned road for vehicle access to structures or uses on lots.
Public Sewer - A sanitary system leading to a treatment plant maintained by the Town.
Public Utilities - Government or private sector owned provider of energy, telecommunications,
transportation, waste disposal, water, or other such basic goods or services.
Recreational Vehicle (RV) - A vehicle or vehicular attachment which is designed for temporary
sleeping or living quarters for one (1) or more persons, and which is not a dwelling, including pickup
campers, travel trailers, tent trailers, and motor homes. In order to be considered as a vehicle and not
as a structure subject to the Land-Use Ordinance, the unit must remain with its tires on the ground,
and must be roadworthy (i.e., possess a current registration sticker from any state Division of Motor
Vehicles). A recreational vehicle will not be occupied as a dwelling for more than ninety (90)
consecutive days, or more than one hundred twenty (120) days in any calendar year.
Restaurant - A business principally engaged in serving prepared foods and
drinks to the public, including businesses serving groups, either on or off the premises.
Right of Way - The legal right, established by usage or grant, to pass along a specific route through
grounds or property belonging to another.
Road - A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or by the repeated passage of motorized vehicles, excluding a
driveway as defined.
Road Classifications
Private Road - A way that the general public has no right to pass over by foot or vehicle, and
for which the Town has no maintenance responsibility.
Public Easement - An easement held by the Town for the purposes of public access for which
the Town has no maintenance responsibility.
State or Town Road - A strip of land held by the State or Town for the passage and use of the
general public by motor vehicles and for which the State or Town has maintenance
responsibility.
60
Road Frontage - The linear distance between the sidelines of a lot, measured along the lot line that
borders upon the road at the edge of the traveled way.
Rod - A linear measurement equal to sixteen and one-half (16.5) feet or five and three hundredths
(5.03) meters.
School, Commercial - A place or institution for teaching and learning, which place or
institution is established for commercial or profit-making purposes, including, by way of
example only, schools for dance, music, riding, gymnastics, photography, driving, or business.
School, Public and Private - A place or institution for teaching and learning, which place
or institution teaches courses of study sufficient to qualify attendance there as being in
compliance with State compulsory education requirements. A public school, as differentiated
from a private school, is operated by a municipal corporation or school administrative district or,
for the purposes of this Ordinance, by a recognized religious organization.
Service Business - A commercial enterprise that provides work performed in an expert manner by
an individual or team for the benefit of its customers. The typical service business provides
intangible products, such as accounting, banking, consulting, cleaning, landscaping, education,
insurance, treatment, and transportation services.
Setback - The minimum distance which a building or other structure must be set back from a lot
line; street or road; a river, wetland or stream; a shore or floodplain; or any other place which is
deemed to need protection.
Shoreland Zone - The land area located within two hundred fifty (250) feet, horizontal distance, of
the mean high-water line of Fresh Pond; within two hundred fifty feet (250) feet, horizontal distance,
of the upland edge of a coastal wetland, including all areas affected by tidal action; or within two
hundred fifty (250) feet of the upland edge of a freshwater wetland.
Sign - Any structure, display, logo, device, or representation which is designed or used to advertise
or call attention to a person, business, activity, or place, and is visible from any public way.
Site Plan - The development plan showing the existing and proposed conditions, including but not
limited to topography, vegetation, drainage, floodplains, marshes, waterways, open spaces,
walkways, means of ingress and egress, utility services, landscaping, structures, signs, lighting, and
screening devices which are submitted along with building plans, elevations, building materials, and
any other information that may be reasonably required to allow an informed decision to be made by
the Planning Board.
Solar Farm - An installation or area of land in which a large number of solar panels are set up in
order to generate electricity. Generally considered a utility-scale solar application.
Structure - Anything constructed or erected, the use of which requires a fixed location temporarily
or permanently located on or in the ground, or an attachment to something having a fixed location on
the ground.
Subdivision - As defined in 30-A M.R.S.A. § 4401. Please refer to the Subdivision Ordinance for
North Haven, Maine.
61
Subsurface Sewage Disposal System - Any system designed to dispose of waste or waste water on
or beneath the surface of the earth, including, but not limited to, septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. Section 414, any surface wastewater disposal system, or any municipal or quasi-municipal
sewer or wastewater treatment system.
Timber Harvesting - The cutting and removal of trees for commercial purposes. This does not
include the clearing of land for approved construction.
Tiny Home - A living space permanently constructed on a frame or chassis and designed for use as a
permanent living quarters (30-A M.R.S. § 4363, LD 1530) and treated as a dwelling unit.
Variance - An approved change of the terms of this Ordinance where such a variance would not be
contrary to the public interest and where, owing to conditions peculiar to the property and not the
result of the actions of the applicant, a literal enforcement of this Ordinance would result in
unnecessary or undue hardship. Variances can only be issued by the Board of Appeals.
Wetland - A freshwater or coastal wetland.
A. Freshwater Wetland - freshwater swamps, marshes, bogs, and similar areas, other than
forested wetlands, which are:
1. Ten (10) or more contiguous acres; or of less than ten (10) contiguous acres and
adjacent to a surface water body, excluding any river, stream or brook, such that in a
natural state, the combined surface area is in excess of ten (10) acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence
of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
conform to the criteria of this definition.
B. Forested Wetland - A freshwater wetland dominated by woody vegetation that is six (6)
meters tall (approximately twenty (20) feet) or taller.
C. Coastal Wetland - All tidal and subtidal lands; all lands with vegetation present that is
tolerant of salt water and occurs primarily in a salt water or estuarine habitat; and any
swamp, marsh, bog, beach, flat or other contiguous low land that is subject to tidal action
during the highest tide level for the year in which an activity is proposed as identified in tide
tables published by the National Ocean Service. Coastal wetlands may include portions of
coastal sand dunes.
Wind Energy System - A wind energy conversion system, consisting of a wind turbine, a tower,
and associated control or conversion electronics, which is intended to primarily reduce on-site
consumption of utility power. See separate Wind Turbine Ordinance.
System Height - The tower height plus the blade radius from the hub.
62
Tower - The structure on which the wind energy system is mounted.
Tower Height - The height above grade of the fixed portion of a tower, excluding the wind
turbine.
Turbine - The parts of the wind system including the blades, generator, and tail.
Wireless Telecommunications Facilities, Cell Towers, Antenna Towers - Structures that receive
and/or transmit wireless communications or other signals, excluding emergency, temporary wireless
telecommunications facilities, amateur (ham) radio stations, parabolic antenna less than seven (7)
feet in diameter that are an accessory use of the property, or antennas as a residential accessory use.
See separate Wireless Telecommunications Facilities Siting Ordinance for the Town of North
Haven.
63
Appendix B removed, March 8, 2025
64
Appendix C: Maps
North Haven Land Use Districts Map
65
North Haven Village District Map