This is the exact embedded text of the captured official document.
Snapshot 089426dcb050 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Subdivision Ordinance
FOR
NORTH HAVEN, MAINE
EFFECTIVE DATE: JANUARY 8, 2013
Amended:
Special Town Meeting, May 16, 2019
1
Table of Contents
ARTICLE 1 - PURPOSES AND STATUTORY REVIEW CRITERIA
4
1.1 Purposes.
4
-----------------------------------------------------------------------------------------------
1.2 Statutory Review Criteria.
4
--------------------------------------------------------------------------
ARTICLE 2 - AUTHORITY AND ADMINISTRATION
7
2.1 Authority.
7
-----------------------------------------------------------------------------------------------
2.2 Administration.
7
----------------------------------------------------------------------------------------
2.3 Amendments.
7
------------------------------------------------------------------------------------------
ARTICLE 3 - DEFINITIONS
7
ARTICLE 4 - ADMINISTRATIVE PROCEDURE
12
ARTICLE 5 - SKETCH PLAN MEETING AND SITE INSPECTION
12
5.1 Purpose.
12
------------------------------------------------------------------------------------------------
5.2 Sketch Plan Meeting Procedure.
12
--------------------------------------------------------------------
5.3 Contour Interval and On-Site Inspection.
13
----------------------------------------------------------
5.4 Rights not Vested.
13
-------------------------------------------------------------------------------------
5.5 Establishment of File.
14
---------------------------------------------------------------------------------
ARTICLE 6 - PRELIMINARY PLAN APPLICATION
14
6.1 Procedure.
14
----------------------------------------------------------------------------------------------
6.2 Mandatory Submissions for Preliminary Plan.
15
---------------------------------------------------
ARTICLE 7 - FINAL PLAN APPLICATION
19
7.1 Procedure.
19
----------------------------------------------------------------------------------------------
7.2 Mandatory Submissions.
21
-----------------------------------------------------------------------------
7.3 Required Submissions for which a Waiver May be Granted.
22
----------------------------------
7.4 Final Approval and Filing.
23
-------------------------------------------------------------------------
ARTICLE 8 - REVISIONS TO APPROVED PLANS
24
8.1 Procedure.
24
----------------------------------------------------------------------------------------------
8.2 Submissions.
24
-------------------------------------------------------------------------------------------
8.3 Scope of Review.
24
--------------------------------------------------------------------------------------
ARTICLE 9 - INSPECTIONS AND ENFORCEMENT
25
9.1 Inspection of Required Improvements.
25
------------------------------------------------------------
9.2 Violations and Enforcement.
26
------------------------------------------------------------------------
ARTICLE 10 - PERFORMANCE & DESIGN STANDARDS
26
10.1 Basic Subdivision Layout.
27
--------------------------------------------------------------------------
10.2 Sufficient Water.
27
-------------------------------------------------------------------------------------
10.3 Erosion and Sedimentation and Impact on Water Bodies.
29
-------------------------------------
10.4 Sewage Disposal.
29
------------------------------------------------------------------------------------
10.5 Solid Waste.
30
------------------------------------------------------------------------------------------
10.6 Impact on Natural Beauty, Aesthetics, Historic Sites, Wildlife Habitat, Rare Natural Areas
or Public Access to the Shoreline.
30
----------------------------------------------------------------------------
10.7 Conformance with Zoning Ordinance and Other Land Use Ordinances.
35
--------------------
10.8 Financial and Technical Capacity.
35
-----------------------------------------------------------------
2
10.9 Impact on Ground Water Quality or Quantity.
35
---------------------------------------------------
10.10 Floodplain Management.
36
--------------------------------------------------------------------------
10.11 Identification of Freshwater Wetlands, Rivers, Streams or Brooks.
37
-------------------------
10.12 Stormwater Management.
37
-------------------------------------------------------------------------
10.13 Cluster Developments.
37
----------------------------------------------------------------------------
10.14 Year-Round Housing Qualifications For Waivers And Density Bonus.
39
--------------------
10.15 Compliance with Timber Harvesting Rules.
42
----------------------------------------------------
10.16 Traffic Conditions and Streets.
43
-------------------------------------------------------------------
10.17 Specific Access and Street Design Standards.
44
-------------------------------------------------
ARTICLE 11 - PERFORMANCE GUARANTEES
55
11.1 Types of Guarantees.
55
--------------------------------------------------------------------------------
11.2 Contents of Guarantee.
55
------------------------------------------------------------------------------
11.3 Escrow Account.
55
-------------------------------------------------------------------------------------
11.4 Performance Bond.
55
----------------------------------------------------------------------------------
11.5 Letter of Credit.
55
--------------------------------------------------------------------------------------
11.6 Phasing of Development.
56
---------------------------------------------------------------------------
11.7 Release of Guarantee.
56
-------------------------------------------------------------------------------
11.8 Default.
56
------------------------------------------------------------------------------------------------
11.9 Improvements Guaranteed.
56
-------------------------------------------------------------------------
11.10 Year-round Housing Units.
56
------------------------------------------------------------------------
ARTICLE 12 - WAIVERS
57
12.1 Waivers of Certain Procedures Authorized.
57
------------------------------------------------------
12.2 Waivers of Certain Improvements and Standards Authorized.
57
--------------------------------
12.3 Conditions for Waivers.
57
-----------------------------------------------------------------------------
12.4 Waivers To Be Shown On Final Plan.
57
------------------------------------------------------------
ARTICLE 13 - APPEALS
58
13.1 Administrative Appeals.
58
----------------------------------------------------------------------------
13.2 Variances.
58
---------------------------------------------------------------------------------------------
13.3 Appeal to Superior Court.
59
--------------------------------------------------------------------------
13.4 Variances Recorded.
59
---------------------------------------------------------------------------------
3
SUBDIVISION ORDINANCE
TOWN OF NORTH HAVEN
ARTICLE 1 - PURPOSES AND STATUTORY REVIEW CRITERIA
1.1 Purposes.
The purposes of these regulations this Ordinance are:
A. To provide for an expeditious and efficient process for the review of proposed subdivisions,
B. To assure that new development in the Town of North Haven meets the goals and conforms
to the policies of the North Haven Comprehensive Plan,
C. To assure the comfort, convenience, safety, health and welfare of the people of the Town of
North Haven,
D. To protect the environment and ensure environmental sustainability, and conserve the natural
and cultural resources identified in the North Haven Comprehensive Plan as important to the
community,
E. To assure that a minimal level of services and facilities is available to the residents of new
subdivisions and that lots in subdivisions are capable of supporting the proposed uses and
structures,
F. To minimize the potential impacts from new subdivisions on neighboring properties and on
the municipality,
G. To promote the development of an economically sound and stable community, and
H. To maintain and promote housing opportunities for year-round working populations and first-
time home buyers, in part by keeping development costs lower than market-rate housing
development projects.
1.2 Statutory Review Criteria.
When reviewing any application for a subdivision, the Planning Board shall find that the
following criteria as found in Title 30-A M.R.S.A. §4404 have been met, as well as all applicable
provisions of the Zoning Land Use Ordinance and other sections of this Regulation Ordinance
have been met, before granting approval. In reviewing an application, the Board shall ensure
the proposed project:
A. Shall not result in undue water or air pollution. In making this determination, the Planning
Board shall at least consider:
1. The elevation of the land above sea level and its relation to the flood plains,
2. The nature of soils and subsoils and their ability to adequately support waste
disposal,
3. The slope of the land and its effect on effluents,
4. The proximity of streams for disposal of effluents, and
5. The applicable State and local health and water resources rules and regulations;
B. Has sufficient water resources available for reasonable and foreseeable needs of the
subdivision,
4
C. Will not cause an unreasonable burden on an existing public water supply or on the water
supplies of abutting properties, as applicable,
D. Will not cause unreasonable soil erosion or reduction in the land's capacity to hold water so
that a dangerous or unhealthy condition results,
E. Will not cause unreasonable highway or public road congestion or unsafe conditions with
respect to the use of the highways or public roads existing or proposed and, if the proposed
subdivision requires driveways or entrances onto a state or state aid highway, located outside
the urban compact area of an urban compact municipality, the Department of Transportation
has provided documentation indicating that the driveways or entrances conform to Title 23,
section 704 and any rules adopted under that section; as amended for state criteria,
F. The proposed subdivision will provide for adequate sewage waste disposal and will not cause
an unreasonable burden on municipal services if they are utilized,
G. Will not cause an unreasonable burden on the municipality's ability to dispose of solid waste
if municipal services are to be utilized,
H. Will not have an undue adverse effect on the scenic or natural beauty of the area, aesthetics,
historic sites, significant wildlife habitat identified by the Department of Inland Fisheries and
Wildlife or the municipality, or rare and irreplaceable natural areas or any public rights for
physical or visual access to the shoreline,
I.
Will be in conformance with a duly adopted subdivision regulation or ordinance,
Comprehensive Plan, development plan or land use plan, if any. In making this
determination, the municipal reviewing authority may interpret these ordinances and plans,
J.
That the developer has adequate financial and technical capacity to ensure that the proposed
subdivision will meet the standards of this section,
K. Will not, alone or in conjunction with existing activities, adversely affect the quality or
quantity of ground or surface waters,
L. Indicates whether the subdivision will be located in a flood-prone area, based on the Federal
Emergency Management Agency's Flood Boundary and Floodway Maps and Flood Insurance
Rate Maps, as well as information presented by the applicant. If the subdivision, or any part
of it, is in such an area, the applicant shall determine the 100-year flood elevation and flood
hazard boundaries within the subdivision. The proposed subdivision or project plan must
include, as a condition of plan approval, a requirement that principal structures in the
subdivision will be constructed with their lowest floor, including the basement, at least one
foot above the 100-year flood elevation,
M. All freshwater wetlands within the proposed subdivision have been identified on any maps
submitted as part of the application, regardless of the size of these wetlands. Any mapping of
freshwater wetlands may be done with the help of the local soil and water conservation
district,
N. Any stream or brook within or abutting the proposed subdivision shall be identified on any
maps submitted as part of the application. For purposes of this section, "river, stream or
brook" has the same meaning as in Title 38, section 480-B, subsection 9,
O. Shall provide for adequate storm water management,
5
P.
If any lots in the proposed subdivision have shore frontage on a river, stream, brook, Fresh
Pond or coastal wetland as these features are defined in Title 38, section 480-B, none of the
lots created within the subdivision shall have a lot depth to shore frontage ratio greater than 5
to 1,
Q. The long-term cumulative effects of the proposed subdivision shall not unreasonably increase
Fresh Pond's phosphorus concentration during the construction phase and life of the
proposed subdivision,
R. Lands subject to liquidation harvesting. Timber on the parcel being subdivided has not been
harvested in violation of rules adopted pursuant to Title 12, M.R.S.A section 8869, subsection
14. If a violation of rules adopted by the Maine Forest Service to substantially eliminate
liquidation harvesting has occurred, the Planning Board must determine prior to granting
approval for the subdivision that 5 years have elapsed from the date the landowner under
whose ownership the harvest occurred acquired the parcel. The Planning Board may request
technical assistance from the Department of Conservation, Bureau of Forestry to determine
whether a rule violation has occurred, or the Planning Board may accept a determination
certified by a forester licensed pursuant to Title 32, chapter 76. If the Bureau agrees to
provide assistance, it shall make a finding and determination as to whether a rule violation
has occurred. If the Bureau notifies the Planning Board that it will not provide assistance, the
Board may require a subdivision applicant to provide a determination certified by a licensed
forester. For the purposes of this subsection, "liquidation harvesting" has the same meaning
as in Title 12, M.R.S.A section 8868, subsection 6 and "parcel" means a contiguous area
within one municipality, township or plantation owned by one person or a group of persons
in common or joint ownership.
6
ARTICLE 2 - AUTHORITY AND ADMINISTRATION
2.1 Authority.
A. This Ordinance has been prepared in accordance with the provisions of Title 30-A M.R.S.A.,
§4403.
B. This Ordinance shall be known and may be cited as "Subdivision Ordinance of the Town of
North Haven, Maine."
2.2 Administration.
A. The Planning Board of the Town of North Haven, hereinafter called the Board, shall
administer this Ordinance.
B. The provisions of this Ordinance shall pertain to all land and buildings proposed for
subdivision within the boundaries of the Town of North Haven, hereinafter called the
Town.
2.3 Amendments.
A. This Ordinance may be amended by the Legislative Body of the Town of North Haven.
B. A public hearing will be held prior to the adoption of any amendment. Notice of the hearing
will be provided at least fourteen (14) days in advance of the hearing, according to
M.R.S.A. 30-A 4352(9).
ARTICLE 3 - DEFINITIONS
In general, words and terms used in this Ordinance will have their customary dictionary meanings.
More specifically, any word or term defined in the North Haven Land Use Ordinance shall have the
definition contained in that ordinance, unless defined differently below; other words and terms used
herein are defined as follows:
Abutting Property: Any lot which is physically contiguous with the subject lot even if only at a point
and any lot which is located directly across a road or right- of-way from the subject lot such that
the extension of the side lot lines of the subject lot would touch or enclose the abutting property.
Applicant: The person applying for subdivision approval under these local ordinances.
Average Daily Traffic (ADT): The average number of vehicles per day that enter and exit the premises
or travel over a specific section of road.
Buffer Area: A part of a property or an entire property that is not built upon and is specifically intended
to separate and thus minimize the effects of a land use activity (e.g. noise, dust, visibility, glare,
etc.) on abutting properties or on sensitive natural resources.
Building: A structure for the support, shelter or enclosure of persons, animals, goods or property of any
kind.
7
Capital Improvements Program (CIP): The municipality's proposed schedule of future projects listed
in order of construction priority together with cost estimates and the anticipated means of
financing each project.
Capital Investment Plan: The portion of the Comprehensive Plan that identifies the projects for
consideration or inclusion within the capital improvements program, together with an estimate of
the order of magnitude for the cost of each project.
Cluster Subdivision: A subdivision in which the lot sizes are reduced below those normally required
by the zoning district in which the development is located in return for the provision of
permanent open space. Also referred to as a "conservation subdivision" or "open space
subdivision."
Common Open Space: Land within or related to a subdivision, not individually owned or within an
individual lot, which is designed and intended for the common use and enjoyment of the
residents of the development or the general public. It may include complementary structures and
improvements, typically used for maintenance and operation of the open space, including
outdoor recreation.
Common Scheme of Development. "Common scheme of development" means a plan or process of
development which:
A. Takes place on contiguous or non-contiguous parcels or lots in the same
vicinity; and
B. Exhibits characteristics of a unified approach, method, or effect such as:
1. unified ownership, management, or supervision;
2. sharing of common infrastructure, equipment, or labor; or
3. common financing.
Complete Application: An application shall be considered complete upon submission of the required
fee and all information required by this Ordinance unless waived, after the applicant's written
request, by a vote by the Board. The Board will issue a written statement to the applicant
upon its determination that an application is complete.
Complete Substantial Construction: The completion of a portion of the improvements which
represents no less than thirty percent (30%) of the costs of the proposed improvements within a
subdivision. If the subdivision is to consist of individual lots to be sold or leased by the
applicant, the cost of construction for buildings on those lots will not be included. If the
subdivision is a multifamily development, or if the applicant proposes to construct the buildings
within the subdivision, the cost of building construction will be included in the total costs of
proposed improvements.
Comprehensive Plan: A document and interrelated documents adopted by the Legislative Body,
containing the elements established under Title 30-A M.R.S.A. §4326 sub-§§ 1 to 4, including
the strategies for an implementation program that are consistent with the State goals and
guidelines established under Title 30-A M.R.S.A. §§4311 through 4350.
Conservation Easement: A non-possessory interest in real property imposing limitations or affirmative
obligations, the purposes of which include retaining or protecting natural, scenic or open space
values of real property; assuring its availability for agricultural, forest, recreational or open space
use; protecting natural resources, or maintaining air or water quality; offered in exchange for
cluster housing.
8
Density: The number of dwelling units per acre of land.
Developed Area: Any area on which a site improvement or change is made, including but not limited to
buildings, landscaping, parking areas, utility infrastructure and streets.
Direct Watershed of Fresh Pond: That portion of the watershed which drains directly to the fresh
pond without first passing through Fresh Pond. For the purposes of this Ordinance, the
watershed boundaries shall be as delineated in the Comprehensive Plan, or as depicted in the
drainage divide data layer provided by the Maine Office of GIS. Due to the scale of the map
there may be small inaccuracies in the delineation of the watershed boundary. Where there is a
dispute as to exact location of a watershed boundary, the Board or its designee and the applicant
shall conduct an on-site investigation to determine where the drainage divide lies. If the Board
and the applicant cannot agree on the location of the drainage divide based on the on-site
investigation, the burden of proof shall lie with the applicant to provide the Board with
information from a professional land surveyor and hydrologist showing where the drainage
divide lies.
Driveway: A vehicular access way serving two lots or less.
Dwelling Unit: A room or suite of rooms used as a habitation that is separate from other such rooms or
suites of rooms, and which contains independent living, cooking, and sleeping facilities;
including but not limited to single family houses, the units in a duplex, apartment house,
multifamily dwellings, and residential condominiums.
Engineered Subsurface wastewater Disposal System: A subsurface wastewater disposal system
designed, installed, and operated as a single unit to treat and dispose of 2,000 gallons of
wastewater per day or more; or any system designed to be capable of treating wastewater with
higher BOD5 and total suspended solids concentrations than domestic wastewater.
Final Plan: The final drawings on which the applicant's plan of subdivision is presented to the Board
for approval and which, if approved, may be recorded at the Registry of Deeds.
Freshwater Wetland: Areas that are inundated or saturated by surface or ground water at a frequency
and for a duration sufficient to support, and which under normal circumstances do support, a
prevalence of wetland vegetation typically adapted for life in saturated soils; and are not part of
Fresh Pond, coastal wetlands, rivers, streams or brooks. Freshwater wetlands may contain small
stream channels or inclusions of land that do not conform to the above criteria.
Great Pond: Any inland body of water which in a natural state has a surface area in excess of ten (10)
acres, and any inland body of water artificially formed or increased which has surface area in
excess of thirty (30) acres, except for the purposes of this Ordinance, where the artificially
formed or increased inland body of water is completely surrounded by land held by a single
owner. Fresh Pond is North Haven's only great pond.
High Intensity Soil Survey: A map prepared by a Certified Soil Scientist, identifying the soil types
down to 1/8 acre or less at a scale equivalent to the subdivision plan submitted. The soils shall
be identified in accordance with the National Cooperative Soil Survey. The map shall show the
location of all test pits used to identify the soils, and shall be accompanied by a log of each
sample point identifying the textural classification and the depth to a limiting factor such as
seasonal high water table or bedrock at that location. Single soil test pits and their evaluation for
suitability for subsurface wastewater disposal systems shall not be considered to constitute high
intensity soil surveys.
9
High Water Mark, Coastal Waters: See DEP Chapter 1000 Minimum Guidelines for Municipal
Shoreland Zoning Ordinances.
High Water Mark, Inland Waters: See DEP Chapter 1000 Minimum Guidelines for Municipal
Shoreland Zoning Ordinances.
Level of Service: A description of the operating conditions a driver will experience while traveling on a
particular street or highway calculated in accordance with the provisions of the Highway
Capacity Manual, most recent edition, published by the National Academy of Sciences,
Transportation Research Board. There are six levels of service ranging from Level of Service A,
with free traffic flow and no delays to Level of Service F, with forced flow and congestion
resulting in complete failure of the roadway.
Lot coverage - the percentage of the lot covered by all buildings, structures, and impervious surfaces
including but not limited to driveways, walkways, parking areas and patios.
Multifamily Development: A subdivision which contains three or more dwelling units on land in
common ownership, such as apartment buildings, condominiums or mobile home parks.
Municipal Engineer: Any registered professional engineer hired or retained by the municipality, either
as staff or on a consulting basis.
Net Residential Acreage: The total acreage available for the subdivision, as shown on the proposed
subdivision plan, minus the area for streets or access and the areas that are unsuitable for
development as outlined in Article 10.
Net Residential Density: The average number of dwelling units per net residential acre.
New Structure or Structures: Includes any structure for which construction begins on or after July 1,
2012. The area included in the expansion of an existing structure is deemed to be a new
structure.
Person: Includes a firm, association, organization, partnership, trust, company, or corporation, as well
as an individual.
Planning Board: The Planning Board of the Town of North Haven, previously defined as "the Board".
Preliminary Plan: The preliminary drawings indicating the proposed layout of the subdivision to be
submitted to the Planning Board for its consideration.
Professional Engineer: A professional engineer, registered in the State of Maine.
Public Water System: A water supply system that provides water to at least 15 service connections or
services water to at least 25 individuals daily for at least 30 days a year.
Recording Plan: An original of the Preliminary Plan, suitable for recording at the Registry of Deeds
and which need show only information relevant to the transfer of an interest in the property, and
which does not show other information presented on the plan such as sewer and water line
locations and sizes, culverts, and building lines.
Rural District: As defined by the Land Use Ordinance of the Town of North Haven.
Sight Distance: The length of an unobstructed view from a particular access point to the farthest visible
point of reference on a roadway. Used in this Ordinance as a reference for unobstructed road
visibility.
Sketch Plan: Conceptual maps, renderings, and supportive data describing the project proposed by the
applicant for initial review prior to submitting an application for subdivision approval.
10
Street: Public and private ways such as alleys, avenues, highways, roads, and other rights-of-way, as
well as areas on subdivision plans designated as rights-of-way for vehicular access other than
driveways.
Street Classification:
Arterial Street: A major thoroughfare which serves as a major traffic way for travel between
and through the municipality. North Haven has no streets considered arterial streets.
Collector Street: A street with average daily traffic of 200 vehicles per day or greater, or streets
which serve as feeders to arterial streets, and collectors of traffic from minor streets.
Cul-de-sac: A street with only one outlet and having the other end for the reversal of traffic
movement.
Industrial or Commercial Street: Streets servicing industrial or commercial uses.
Minor Residential Street: A street servicing only residential properties and which has an
average daily traffic of less than 200 vehicles per day.
Private Right-of-Way: A minor residential street servicing no more than eight dwelling units,
which is not intended to be dedicated as a public way.
Subdivision means the division of a tract or parcel of land into three (3) or more lots within any five
year period that begins on or after September 23, 1971. This definition applies whether the
division is accomplished by sale, lease, development, building or otherwise. The term
"subdivision" also includes the division of a new structure or structures on a tract or parcel of
land into three (3) or more dwelling units within a five year period, the construction or placement
of three (3) or more dwelling units on a single tract or parcel of land and the division of an
existing structure or structures previously used for commercial or industrial use into three (3) or
more dwelling units within a five year period.
A. In determining whether a tract or parcel of land is divided into three (3) or more lots, the
first division of the tract or parcel is considered to create the first two (2) lots and the next
division of either of these first two (2) lots, by whomever accomplished, is considered to
create a third lot, unless:
1. Both divisions are accomplished by an applicant who has retained one of the lots for
the applicant's own use as a single-family residence that has been the applicant's
principal residence for a period of at least five years immediately preceding the
second division; or
2. The division of the tract or parcel is otherwise exempt under this subchapter.
B. The division of a tract or parcel of land and the lot or lots so made, which division or lots
when made are not subject to this subchapter, do not become subject to this subchapter by
the subsequent division of that tract or parcel of land or any portion of that tract or parcel.
The municipal reviewing authority shall consider the existence of the previously created
lot or lots in reviewing a proposed subdivision.
This term has been defined as in Title 30-A M.R.S.A. §4401, sub-§4, as amended. A lot of 40 or
more acres shall be counted as a lot for the purposes of this definition when the parcel of land
being divided is located entirely outside the Shoreland Zone as defined in the Town of North
Haven Shoreland Zoning Ordinance.
11
Tract or Parcel of Land: All contiguous land in the same ownership, provided that lands located on
opposite sides of a public or private road shall be considered each a separate tract or parcel of
land unless such road was established by the owner of land on both sides thereof.
Usable Open Space: That portion of the common open space which, due to its slope, drainage
characteristics and soil conditions can be used for active recreation, horticulture or agriculture.
In order to be considered usable open space, the land must not be poorly drained or very poorly
drained, have ledge outcroppings, or areas with slopes exceeding 10%.
Village District: As defined by the Land Use Ordinance of the Town of North Haven.
Year-round Housing Unit: Lots/units which may be purchased or rented for occupancy by year-round
residents of North Haven people earning 200% 250% of area median income for Knox County
or less, as established by the Department of Housing and Urban Development (HUD), United
States Census, the Maine Department of Agriculture Conservation and Forestry (formerly Maine
State Planning Office) or the Mid-Coast Regional Planning Commission.
100-Year Flood: The highest level of flood that, on the average, has a one percent (1%) chance of
occurring in any given year.
ARTICLE 4 - ADMINISTRATIVE PROCEDURE
In order to establish an orderly, equitable and expeditious procedure for reviewing subdivisions and to
avoid unnecessary delays in processing applications for subdivision review, the Board will prepare a
written agenda for each regularly scheduled meeting. The agenda will be prepared no less than one
week in advance of the meeting, distributed to the Board members and any applicants appearing on the
agenda, and posted at the municipal offices. Applicants shall request to be placed on the Board's agenda
at least fourteen days in advance of a regularly scheduled meeting by contacting the Chairperson.
Applicants who attend a meeting but who are not on the Board's agenda may be heard only after all
agenda items have been completed, and then only if a majority of the Board so votes. However, the
Board shall take no action on any application not appearing on the Board's written agenda.
ARTICLE 5 - SKETCH PLAN MEETING AND SITE INSPECTION
5.1 Purpose.
The purpose of the Sketch Plan meeting and on-site inspection is for the applicant to present
general information regarding the proposed subdivision to the Board and receive the Board's
comments prior to the expenditure of substantial sums of money on surveying, soils
identification, and engineering by the applicant.
5.2 Sketch Plan Meeting Procedure.
A. The applicant shall present the Sketch Plan and make an oral presentation regarding the site
and the proposed subdivision.
12
B. Sketch Plan Submissions: Nine (9) copies of the Sketch Plan and all supporting materials
must be submitted 30 days prior to a regularly scheduled Planning Board meeting, in order to
be placed on the Board's agenda. The Sketch Plan shall show, in simple sketch form, the
proposed layout of streets, lots, buildings and other features in relation to existing conditions.
The Sketch Plan, which does not have to be engineered and may be a freehand pencil sketch,
shall show site conditions such as steep slopes, wet areas and vegetative cover in a general
manner. The Sketch Plan shall be supplemented with a written project narrative, with general
information to describe or outline the existing conditions of the site and a full description of
the proposed development. The narrative should include general proposals for how any
common areas and infrastructure will be managed and maintained. It is recommended that
the sketch plan be superimposed on or accompanied by a copy of the Assessor's Map(s) on
which the land is located. The Sketch Plan shall be accompanied by:
1. A Sketch Plan Application form, and a Sketch Plan Application fee as set by a
fee schedule established by the Select Board,
2. A copy of a portion of the U.S.G.S. topographic map of the area showing the
outline of the proposed subdivision; unless the proposed subdivision is less
than 10 acres in size,
3. A copy of that portion of the Knox County Soil Survey covering the proposed
subdivision, showing the outline of the proposed subdivision development, and
4. A written project narrative as described above.
C. Following the applicant's presentation, the Board may ask questions, point out potential
problems or issues for future discussions, and make suggestions to be incorporated by the
applicant into the subsequent application. Substantive, lengthy discussions about compliance
with review standards or the consideration of waiver requests will be postponed until the
subsequent review of the full application.
D. The date of the on-site inspection will be selected.
5.3 Contour Interval and On-Site Inspection.
Within thirty (30) days of the Sketch Plan meeting, the Board shall hold an on-site inspection of
the property and inform the applicant in writing of the required contour interval on the
Preliminary Plan. The applicant shall place flagging at the centerline of any proposed streets,
and at the approximate intersections of the street centerlines and lot corners, prior to the on-site
inspection. If the proposed project includes buildings, the approximate corners of building
footprints shall be flagged. The Board may choose not to conduct on-site inspections when there
is inclement weather or snow on the ground disguising ground contours and water bodies; or if
there is perceived danger to the inspectors (for example, deer rifle hunting season). On-site
inspections will be noticed as required by 1 M.R.S.A. §§401-410, and the public shall be allowed
to accompany the Board. Minutes will be taken in the same manner as for regular meetings.
5.4 Rights not Vested.
The Sketch Plan meeting, the submittal or review of the Sketch Plan or the on-site inspection
shall not be considered the initiation of the review process for the purposes of bringing the plan
under the protection of Title 1 M.R.S.A., §302.
13
5.5 Establishment of File.
Following the Sketch Plan meeting the Board will establish a file for the proposed subdivision.
All correspondence and submissions regarding the Sketch Plan meeting and application will be
maintained in the file.
ARTICLE 6 - PRELIMINARY PLAN APPLICATION
6.1 Procedure.
A. Within six months after the on-site inspection by the Board and receipt of comments, the
applicant shall submit an application for approval of a Preliminary Plan at least 14 days prior
to a scheduled meeting of the Board. Applications shall be submitted by mail or by hand to
the municipal offices. Failure to submit an application within six months shall require
resubmission of the Sketch Plan to the Board. The Preliminary Plan shall approximate the
layout shown on the Sketch Plan, plus accommodation of any recommendations made by the
Board.
B. All applications for the Preliminary Plan shall be accompanied by a non-refundable
application fee based on a fee schedule established by the Select Board, payable by check to
the Town. In addition, the applicant shall pay an escrow fee, based on a fee schedule
established by the Select Board, per lot or dwelling unit, to be deposited in a special escrow
account designated for that subdivision application, to be used by the Board for hiring
independent consulting services to review engineering and other technical submissions
associated with the application, and to ensure compliance with the this Ordinance and the
Land Use Ordinance. If the balance in this special account is drawn down by 75%, the Board
will notify the applicant, and require that the balance be brought back up to the original
deposit amount. The Board will continue to notify the applicant and require a deposit as
necessary whenever the balance of the escrow account is drawn down by 75% of the original
deposit. Any balance in the escrow account remaining after a decision on the Final Plan
application by the Board shall be returned to the applicant.
C. The Board will not review any Preliminary Plan application unless the applicant or
applicant's representative attends the meeting. Should the applicant or the applicant's
representative fail to attend, the Board will reschedule review of the application at its next
regular meeting.
D. Within three (3) days of the receipt of the Preliminary Plan application, the Board, or its
designee, will:
1. Issue a dated receipt to the applicant.
2. Notify in writing by First Class Mail all owners of abutting property that an application
for subdivision approval has been submitted, specifying the location of the proposed
subdivision and including a general description of the project.
E. Within thirty (30) days of the receipt of the Preliminary Plan application, the Board will
determine whether the application is complete and notify the applicant in writing of its
14
determination. If the application is not complete, the Board will notify the applicant of the
specific additional material needed to complete the application.
F. Upon determination that a complete application has been submitted for review, the Board
will notify the applicant in writing. The Board will also notify the Road Commissioner, Fire
Chief and Superintendent of Schools of the proposed subdivision, the number of dwelling
units proposed, the length of roadways, and the size and construction characteristics of any
single family, multifamily, commercial or industrial buildings. The Board will request that
these officials comment upon the adequacy of their departments' existing capital facilities to
service the proposed subdivision.
G. The Board will hold a public hearing within thirty (30) days of determining that it has
received a complete application, and will publish a notice of the date, time and place of the
hearing in a newspaper of general circulation in the Town at least two times, the date of the
first publication to be on the Town of North Haven website at least fourteen (14) days prior to
the hearing. In addition, the notice of the hearing will be posted in at least three prominent
places within the Town at least fourteen (14) days prior to the hearing. A copy of the notice
will be sent by First Class mail to landowners of abutting properties, landowners within three
hundred feet (300 feet) of the subject property and to the applicant, at least fourteen (14) days
prior to the hearing.
H. Within thirty (30) days from the public hearing, or within another time limit as may be
otherwise mutually agreed to by the Board and the applicant, the Board will make findings of
fact on the application, and approve, approve with conditions, or deny the Preliminary Plan
application. The Board will specify in writing its findings of fact and reasons for any
conditions or denial.
I.
When granting approval to a Preliminary Plan, the Board will state the conditions of such
approval, if any, with respect to:
1. The specific changes which it will require in the Final Plan,
2. The character and extent of the required improvements for which waivers may have been
requested and which the Board finds may be waived without jeopardy to the public
health, safety, and general welfare, and,
3. The construction items for which cost estimates and performance guarantees will be
required as prerequisite to the approval of the Final Plan.
J.
Approval of a Preliminary Plan will not constitute approval of the Final Plan or intent to
approve the Final Plan, rather it shall be deemed an expression of approval of the design of
the Preliminary Plan as a guide to the preparation of the Final Plan. The Final Plan shall be
submitted for approval by the Board upon fulfillment of the requirements of this Ordinance
and the conditions of preliminary approval, if any. Prior to the approval of the Final Plan, the
Board may require that additional information be submitted and changes in the Plan be made
as a result of further study of the proposed subdivision or as a result of new information
received.
6.2 Mandatory Submissions for Preliminary Plan.
A. Application Materials: The following items shall be submitted as part of the Preliminary Plan
Application, unless the applicant submits a written waiver request, and is granted a waiver
15
from the submission requirement by the Board, pursuant to Article 12. Nine (9) copies of all
materials shall be delivered to the Town Office, at least 14 days prior to a regularly scheduled
Planning Board meeting, in order for the application to be placed on the Board's agenda. The
Board may require additional information to be submitted, as necessary, in order to determine
whether the criteria of Title 30-A M.R.S.A., §4404 and local ordinances are met. The
application materials for Preliminary Plan approval shall include the following information:
B. Location Map: The location map shall be drawn at a size adequate to show the relationship of
the proposed subdivision to the adjacent properties, and to allow the Board to locate the
subdivision within the Town. The location map shall show:
1. Existing subdivisions in the proximity of the proposed subdivision,
2. Locations and names of existing and proposed streets,
3. Boundaries and designations of zoning districts,
4. An outline of the lands included in the proposed subdivision and any remaining lands in
the vicinity in which the applicant has a legal interest and which may be considered to be
part of a common scheme of development,
5. All subdivision boundary corners and angle points, including all lot boundary corners and
angle points, shall be marked.
C. Preliminary Plan Contents: The Preliminary Plan may be printed or reproduced on paper,
with all dimensions shown in feet or decimals of a foot. The Preliminary Plan shall be drawn
to a scale of not more than 100 feet to the inch. Plans for subdivisions containing more than
100 acres may be drawn at a scale of not more than 200 feet to the inch, provided all
necessary detail can easily be read. The application materials for Preliminary Plan approval
shall include the following information:
1. Proposed name of the subdivision and the name of the municipality in which it is located,
plus the Assessor's Map and Lot numbers,
2. Verification of right, title or interest in the property by deed, purchase and sales
agreement, option to purchase, or some other proof of interest,
3. A standard boundary survey of the parcel, giving complete descriptive data by bearings
and distances, made and certified by a professional land surveyor. The corners of the
parcel shall be located on the ground and marked by monuments. The entire parcel or
tract shall be shown, including all contiguous land in common ownership within the last
five years, as required by Title 30-A M.R.S.A. section 4401,
4. A copy of the most recently recorded deed for the parcel. A copy of all deed restrictions,
easements, rights-of-way, or other encumbrances currently affecting the property,
5. A copy of any deed restrictions intended to cover all or part of the lots or dwellings in the
subdivision,
6. An indication of the type of sewage disposal to be used in the subdivision,
a.
When sewage disposal is to be accomplished by connection to the public
sewer, a letter from the Town sewer department stating the district has the
capacity to collect and treat the wastewater shall be provided.
16
b. When sewage disposal is to be accomplished by subsurface wastewater
disposal systems, test pit analyses, prepared by a Licensed Site Evaluator
or Certified Soil Scientist shall be provided. A map showing the location
of all test pits dug on the site shall be submitted.
7. An indication of the type of water supply system(s) to be used in the subdivision,
a.
When water is to be supplied by public water supply, a written statement from the
servicing water district shall be submitted indicating there is adequate supply and
pressure for the subdivision.
8. The date the plan was prepared, north point, and graphic map scale,
9. The names and addresses of the record owner, applicant, and individual or company who
prepared the plan and adjoining property owners,
10. A delineation of all wetland areas, regardless of size. The number of acres within the
proposed subdivision, location of property lines, existing buildings, vegetative cover
type, unusually large specimen trees, if present, and other essential existing physical
features. The location of all rivers, streams and brooks within or adjacent to the proposed
subdivision. The application shall indicate if any area of the subdivision is in the
watershed of Fresh Pond,
11. The zoning district in which the proposed subdivision is located and the location of any
zoning boundaries affecting the subdivision,
12. The location and size of existing and proposed sewers, water mains, culverts, and
drainage ways on or adjacent to the property to be subdivided,
13. The location, names, and present widths of existing streets, highways, easements,
building footprints, parks and other open spaces on or adjacent to the subdivision,
14. The width and location of any streets, public improvements or open space shown upon
the official map and the Comprehensive Plan, if any, within the subdivision,
15. The proposed lot lines with approximate dimensions and lot areas,
16. All parcels of land proposed to be dedicated to public use and the conditions of such
dedication,
17. The location of any open space to be preserved or common areas to be created, and a
general description of proposed ownership, improvement and management,
18. The area on each lot where existing forest cover will be permitted to be removed and
converted to lawn, structures or other cover and any proposed restrictions to be placed on
clearing existing vegetation,
19. If any portion of the subdivision is in a flood-prone area, the boundaries of any flood
hazard areas and the 100-year flood elevation, as depicted on the municipality's Flood
Insurance Rate Map, shall be delineated on the Plan,
20. Areas within or adjacent to the proposed subdivision which have been identified by the
Maine Department of Inland Fisheries and Wildlife Beginning with Habitat Project or
within the Comprehensive Plan. If any portion of the subdivision is located within an
area designated as a unique natural area by the Comprehensive Plan or the Maine Natural
17
Areas Program or Maine Department of Inland Fisheries & Wildlife Beginning With
Habitat Project, or by a town-wide natural features survey, the plan shall indicate
appropriate measures for the preservation of the values which qualify the site for such
designation,
21. All areas within or adjacent to the proposed subdivision which are either listed on or
eligible to be listed on the National Register of Historic Places, or have been identified in
the Comprehensive Plan or by the Maine Historic Preservation Commission, or by a
town-wide survey as sensitive or likely to contain such sites.
D. Required Submissions For Which A Waiver May Be Granted: The following items shall be
submitted as part of the Preliminary Plan Application, unless the applicant submits a written
waiver request, and is granted a waiver from the submission requirement by the Planning
Board, pursuant to Article 12, Waivers. Nine (9) copies of all materials shall be delivered to
the Town Office, at least 14 days prior to a regularly scheduled Planning Board meeting, in
order for the application to be placed on the Board's agenda. The Board may require
additional information to be submitted, as necessary, in order to determine whether the
criteria of Title 30-A M.R.S.A., §4404 are met.
1. A high-intensity soil survey by a registered soil scientist.
2. Contour lines at the interval specified by the Planning Board, showing
elevations in relation to mean sea level.
3. A Hydrogeologic assessment.
a.
A hydrogeologic assessment prepared by a certified geologist or registered
professional engineer, experienced in hydrogeology, when the subdivision
is not served by public sewer and/or any part of the subdivision is located
over a sand and gravel aquifer, as shown on a map entitled "Hydrogeologic
Data for Significant Sand and Gravel Aquifers," by the Maine Geological
Survey, 1998, File No. 98-138, 144 and 147; or the subdivision has an
average density of more than one dwelling unit per 100,000 square feet.
b. The Board may require a hydrogeologic assessment in other cases where
site considerations or development design indicate greater potential of
adverse impacts on groundwater quality. These cases include but are not
limited to extensive areas of shallow to bedrock soils; or cluster
developments in which the average density is less than one dwelling unit
per 100,000 square feet but the density of the developed portion is in
excess of one dwelling unit per 80,000 square feet; and proposed use of
shared or common subsurface wastewater disposal systems. The
hydrogeologic assessment shall be conducted in accordance with the
provisions of Section 10.9 below.
4. An estimate of the amount and type of vehicular traffic to be generated on a
daily basis and at peak hours. Trip generation rates used shall be taken from the
most recent available edition of the Trip Generation Manual, published by the
Institute of Transportation Engineers. Trip generation rates from other sources
may be used if the applicant demonstrates that these sources better reflect local
conditions.
18
5. Traffic Impact Analysis. For subdivisions involving 28 or more parking spaces
or projected to generate more than 140 vehicle trips per day, a traffic impact
analysis, prepared by a Registered Professional Engineer with experience in
traffic engineering, shall be submitted. The analysis shall indicate the expected
average daily vehicular trips, peak-hour volumes, access conditions at the site,
distribution of traffic, types of vehicles expected, effect upon the level of
service of the street giving access to the site and neighboring streets which may
be affected, and recommended improvements to maintain the desired level of
service on the affected streets.
E. The Planning Board may require any additional information not listed above, when it is
determined necessary by the Board to determine whether the statutory review criteria of Title
30-A M.R.S.A. §4404 has been met.
ARTICLE 7 - FINAL PLAN APPLICATION
7.1 Procedure.
A. Within six months after the approval of the Preliminary Plan, the applicant shall submit nine
(9) copies of an application for approval of the Final Plan with all supporting materials, at
least 14 days prior to a scheduled meeting of the Board. Applications shall be submitted by
mail to the Board in care of the municipal offices or delivered by hand to the municipal
offices. If the application for the Final Plan is not submitted within six months after
Preliminary Plan approval, the Board shall require resubmission of the Preliminary Plan,
except as stipulated below. The Final Plan shall approximate the layout shown on the
Preliminary Plan, plus any changes required by the Board.
1. If an applicant cannot submit the Final Plan within six months, due to delays
caused by other regulatory bodies or other reasons, the applicant may request
an extension. Such a request for an extension to the filing deadline shall be
filed, in writing, with the Board prior to the expiration of the filing period. To
approve a request for an extension, the Board shall make findings that the
applicant has made due progress in preparation of the Final Plan and in
pursuing approval(s) by other agencies, and that municipal ordinances or
regulations relevant to the proposed development have not been amended.
B. All applications for Final Plan approval for a major subdivision shall be accompanied by a
non-refundable application fee based on a fee schedule established by the Select Board,
payable by check to the municipality. The Planning Board may continue to require the
replenishment of the escrow account for hiring independent consulting services to review the
application for Final Plan approval, along with any supporting materials, pursuant to the
procedures of section 6.1 B.
C. Prior to submittal of the Final Plan application, the following approvals shall be obtained in
writing, where applicable:
1. Maine Department of Environmental Protection, under the Site Location of
Development Act.
19
2. Maine Department of Environmental Protection, under the Natural Resources
Protection Act or Stormwater Law, or if an MEPDES wastewater discharge
license is needed.
3. Maine Department of Human Services, if the applicant proposes to provide a
public water system.
4. Maine Department of Human Services, if an engineered subsurface wastewater
disposal system(s) is to be utilized.
5. U.S. Army Corps of Engineers, if a permit under Section 404 of the Clean
Water Act is required.
6. Maine Department of Transportation Traffic Movement Permit, and/or
Highway Entrance/Driveway Access Management Permit.
7. If the Board is unsure whether a permit or license from a state or federal
agency is necessary, the applicant may be required to obtain a written opinion
from the appropriate agency as to the applicability of their regulations.
D. If the Preliminary Plan identified any areas listed on or eligible to be listed on the National
Register of Historic Places, or identified by a town-wide survey, in accordance with Section
6.2.C.21, the applicant shall submit a copy of the Plan and a copy of any proposed mitigation
measures to the Maine Historic Preservation commission prior to submitting the Final Plan
application.
E. Written approval of any proposed street names from the Town of North Haven E911
Addressing Officer.
F. The Board shall not review any Final Plan application unless the applicant or applicant's
representative attends the meeting. Should the applicant or the applicant's representative fail
to attend, the Board shall reschedule review of the application at its next regular meeting.
G. Within three days of the receipt of the Final Plan application, the Board, or its designee, shall
issue a dated receipt to the applicant.
H. Within thirty (30) days of the receipt of the Final Plan application, the Board shall determine
whether the application is complete and notify the applicant in writing of its determination.
If the application is not complete, the Board shall notify the applicant of the specific
additional material needed to complete the application.
I.
Upon determination that a complete application has been submitted for review, the Board
shall notify the applicant in writing. The Board shall determine whether to hold a public
hearing on the Final Plan application.
J.
The Board will hold a public hearing within thirty (30) days of determining that it has
received a complete application, and will publish a notice of the date, time and place of the
hearing in a newspaper of general circulation in the Town at least two times, the date of the
first publication to be on the Town of North Haven website at least fourteen (14) days prior to
the hearing. In addition, the notice of the hearing will be posted in at least three prominent
places within the Town at least fourteen (14) days prior to the hearing. A copy of the notice
will be sent by First Class mail to landowners of abutting properties, landowners within three
hundred feet (300 feet) of the subject property and to the applicant, at least fourteen (14) days
prior to the hearing.
20
K. Before the Board grants approval of the Final Plan, the applicant shall meet the performance
guarantee requirements contained in Article 11.
L. Within thirty (30) days from the public hearing or within sixty days of receiving a complete
application, if no hearing is held, or within another time limit as may be otherwise mutually
agreed to by the Board and the applicant, the Board shall make findings of fact, and
conclusions relative to the criteria for approval contained in Title 30-A M.R.S.A., §4404 and
the standards of this Ordinance. If the Board finds that all the criteria of the statute and the
standards of have been met, they shall approve the Final Plan. If the Board finds that any of
the criteria of the statute or the standards of this Ordinance have not been met, the Board
shall either deny the application or approve the application with conditions to ensure all of
the standards will be met by the subdivision. The reasons for any conditions shall be stated
in the records of the Board.
7.2 Mandatory Submissions.
The Final Plan shall consist of one or more maps or drawings drawn to a scale of not more than
one hundred feet to the inch. Plans for subdivisions containing more than one hundred acres
may be drawn at a scale of not more than two hundred feet to the inch provided all necessary
detail can easily be read. Plans shall be no larger than 24 by 36 inches in size, and shall have a
margin of two inches outside of the border line on the left side for binding and a one inch margin
outside the border along the remaining sides. Space shall be reserved on the Plan for
endorsement by the Board. One reproducible, stable-based transparency of the Recording Plan
to be recorded at the Registry of Deeds, and 9 full sized paper copies of all the Final Plan sheets
and any supporting documents shall be submitted, in addition to an electronic copy of the
application to the Town of North Haven.
The Final Plan shall include or be accompanied by the following mandatory submissions of
information:
A. Completed Final Plan Application Form and Final Plan Application Submissions Checklist.
B. Proposed name of the subdivision and the name of the municipality in which it is located,
plus the North Haven assessor's map and lot numbers.
C. The number of acres within the proposed subdivision, location of property lines, existing
buildings, watercourses, and other essential existing physical features.
D. An indication of the type of sewage disposal to be used in the subdivision. When sewage
disposal is to be accomplished by connection to the public sewer, a written statement from
the sewer district indicating the district has reviewed and approved the sewerage design shall
be submitted.
E. An indication of the type of water supply system(s) to be used in the subdivision.
F. When water is to be supplied by an existing public water supply, a written statement from the
servicing water district shall be submitted indicating the district has reviewed and approved
the water system design.
G. A written statement shall be submitted from the fire chief approving all hydrant locations or
other fire protection measures deemed necessary.
21
H. When water is to be supplied by private wells, evidence of adequate ground water supply and
quality shall be submitted by a well driller or a hydrogeologist familiar with the area.
I.
The date the plan was prepared, north point, graphic map scale.
J.
The names and addresses of the record owner, applicant, and individual or company who
prepared the plan.
K. The location of any zoning boundaries affecting the subdivision.
L. If different than those submitted with the Preliminary Plan, a copy of any proposed deed
restrictions intended to cover all or part of the lots or dwellings in the subdivision.
M. The location and size of existing and proposed sewers, water mains, culverts, and drainage
ways on or adjacent to the property to be subdivided.
N. The location, names, and present widths of existing and proposed streets, highways,
easements, buildings, parks and other open spaces on or adjacent to the subdivision. The
plan shall contain sufficient data to allow the location, bearing and length of every street line,
lot line, and boundary line to be readily determined and be reproduced upon the ground.
These lines shall be tied to reference points previously established. The location, bearing and
length of street lines, lot lines and parcel boundary lines shall be certified by a professional
land surveyor. The surveyor shall ensure that all lot corners have suitable monumentation.
The original reproducible plan shall be embossed with the seal of the professional land
surveyor and be signed by that individual.
O. Street plans, meeting the requirements of Section 10.15.
P.
The width and location of any proposed new streets or public improvements or open space
within the subject property that are shown upon the official map, in the Comprehensive Plan,
or Capital Improvements Program, if any.
Q. All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Written offers to convey title to the municipality of all public ways and open
spaces shown on the Plan, and copies of agreements or other documents showing the manner
in which open spaces to be retained by the developer or lot owners are to be managed and
maintained shall be submitted. These may include homeowners' association bylaws and
condominium declarations. If proposed streets and/or open spaces or other land is to be
offered to the municipality, written evidence that the Municipal Officers are satisfied with the
legal sufficiency of the written offer to convey title shall be included.
R. The boundaries of any flood hazard areas and the 100-year flood elevation as depicted on the
municipality's Flood Insurance Rate Map, shall be delineated on the plan.
S. The location and method of disposal for land clearing and construction debris.
T. The location of any lands in the vicinity in which the applicant has a legal interest and which
may be considered to be part of a common scheme of development, but which are proposed to be
excluded from the subdivision.
7.3 Required Submissions for which a Waiver May be Granted.
The Final Plan shall also include or be accompanied by the following information, unless a
waiver is requested and granted pursuant to Article 12, Waivers.
22
A. An erosion and sedimentation control plan prepared in accordance with the Maine Erosion
and Sediment Control Handbook for Construction, Best Management Practices, published by
the Maine Department of Environmental Protection and the Cumberland County Soil and
Water Conservation District, 1991.
B. A stormwater management plan, prepared by a registered professional engineer in accordance
with the most recent edition of Stormwater Management for Maine: BMPS Technical Design
Manual, published by the Maine Department of Environmental Protection, 2006. Another
methodology may be used if the applicant can demonstrate it is equally applicable to the site.
C. If any portion of the proposed subdivision is in the direct watershed of Fresh Pond, and meets
the criteria of section 10.12.D, the following shall be submitted or indicated on the plan:
1. A phosphorus impact analysis and control plan conducted using the procedures
set forth in DEP Phosphorus Design Manual, Volume II of the Maine
Stormwater Best Management Practices Manual, 2006. The analysis and
control plan shall include all worksheets, engineering calculations, and
construction specifications and diagrams for control measures, as required by
the Technical Guide.
2. A long-term maintenance plan for all phosphorus control measures.
3. The contour lines shown on the plan shall be at an interval of no less than five
(5) feet.
4. Areas with sustained slopes greater than twenty five percent (25%) covering
more than one acre shall be delineated.
7.4 Final Approval and Filing.
A. No Plan shall be approved by the Board as long as the applicant is in violation of the
provisions of a previously approved Plan within the municipality.
B. Upon findings of fact and determination that all standards in Title 30-A M.R.S.A., §4404, and
this Ordinance have been met, and upon voting to approve the subdivision, the Board shall
sign the Final Plan. The Board shall specify in writing its findings of facts and reasons for
any conditions or denial. One copy of the signed Plan shall be retained by the Board as part
of its permanent records. One copy of the signed Plan shall be forwarded to the tax assessor.
One copy of the signed Plan shall be forwarded to the Code Enforcement Officer. Any
subdivision not recorded in the Registry of Deeds within ninety (90) days of the date upon
which the Plan is approved and signed by the Board shall become null and void.
C. At the time the Board grants Final Plan approval, it may permit the Plan to be divided into
two or more sections subject to any conditions the Board deems necessary in order to ensure
the orderly development of the Plan. If any municipal or quasi-municipal department head
notified of the proposed subdivision informs the Board that their department or district does
not have adequate capital facilities to service the subdivision, the Board shall require the Plan
to be divided into two or more sections subject to any conditions the Board deems necessary
in order to allow the orderly planning, financing and provision of public services to the
subdivision. If the expansion, addition or purchase of the needed facilities is included in the
municipality's capital improvements program, the time period of the phasing shall be no
longer than the time period contained in the capital improvements program for the expansion,
addition or purchase.
23
D. No changes, erasures, modifications, or revisions shall be made in any final plan after
approval has been given by the Board and endorsed in writing on the plan, unless a revised
Final Plan is first submitted and the Board approves any modifications, in accordance with
Article 8. The Board shall make findings that the revised plan meets the criteria of Title 30-A
M.R.S.A., §4404, and the standards of this Ordinance. In the event that a Plan is recorded
without complying with this requirement, it shall be considered null and void, and the Board
shall institute proceedings to have the Plan stricken from the records of the Registry of
Deeds.
E. The approval by the Board of a Subdivision Plan shall not be deemed to constitute or be
evidence of any acceptance by the municipality of any street, easement, or other open space
shown on such plan. When a park, playground, or other recreation area shall have been
shown on the Plan to be dedicated to the municipality, approval of the Plan shall not
constitute an acceptance by the municipality of such areas. The Board shall require the plan
to contain appropriate notes to this effect. The Board may also require the filing of a written
agreement between the applicant and the municipal officers covering future deed and title
dedication, and provision for the cost of grading, development, equipment, and maintenance
of any such dedicated area.
F. Except in the case of a Phased Development Plan, failure to complete substantial
construction of the subdivision within five years of the date of approval and signing of the
Plan shall render the Plan null and void. Upon determining that a subdivision's approval has
expired under this paragraph, the Board shall have a notice placed in the Registry of Deeds to
that effect.
ARTICLE 8 - REVISIONS TO APPROVED PLANS
8.1 Procedure.
An applicant for a revision to a previously approved Plan shall, at least 30 days prior to a
scheduled meeting of the Board, request to be placed on the Board's agenda. If the revision
involves the creation of additional lots or dwelling units, the procedures for Preliminary Plan
approval shall be followed. If the revision involves only modifications of the approved Plan,
without the creation of additional lots or dwelling units, the procedures for Final Plan approval
shall be followed.
8.2 Submissions.
The applicant shall submit a copy of the approved Plan as well as nine (9) copies of the proposed
revisions. The application shall also include enough supporting information to allow the Board
to make a determination that the proposed revisions meet the standards of this Ordinance and the
criteria of the statute. The revised plan shall indicate that it is the revision of a previously
approved and recorded Plan and shall show the title of the subdivision and the book and page or
cabinet and sheet on which the original Plan is recorded at the Registry of Deeds.
8.3 Scope of Review.
The Board's scope of review shall be limited to those portions of the Plan which are proposed to
be changed.
24
ARTICLE 9 - INSPECTIONS AND ENFORCEMENT
9.1 Inspection of Required Improvements.
A. At least 30 days prior to commencing construction of required improvements, the applicant
or builder shall:
1. Notify the Code Enforcement Officer in writing of the time when (s)he
proposes to commence construction of such improvements, so that the
municipal officers can arrange for inspections to assure that all municipal
specifications, requirements, and conditions of approval are met during the
construction of required improvements, and to assure the satisfactory
completion of improvements and utilities required by the Board.
2. Deposit with the municipal officers a check for the amount of 2% of the
estimated costs of the required improvements to pay for the costs of inspection.
If upon satisfactory completion of construction and cleanup there are funds
remaining, the surplus shall be refunded to the applicant or builder as
appropriate. If the inspection account shall be drawn down by 90%, the
applicant or builder shall deposit an additional 1% of the estimated costs of the
required improvements.
B. If the inspecting official finds upon inspection of the improvements that any of the required
improvements have not been constructed in accordance with the Plans and specifications
filed by the applicant, the inspecting official shall so report in writing to the municipal
officers, Board, and the applicant and builder. The municipal officers shall take any steps
necessary to assure compliance with the approved Plans, beginning with the issuance of a
cease and desist and the accrual of fines following.
C. If at any time it appears necessary or desirable to modify the required improvements before
or during the construction of the required improvements, the inspecting official is authorized
to approve minor modifications due to unforeseen circumstances such as encountering
hidden outcrops of bedrock, natural springs, etc. The inspecting official shall issue any
approval under this section in writing and shall transmit a copy of the approval to the Board.
Revised plans shall be filed with the Board. For major modifications, such as relocation of
rights-of-way, property boundaries, changes of grade by more than 1%, etc., the applicant
shall obtain permission from the Board to modify the plans in accordance with Article 8.
D. At the close of each summer construction season the Town shall, at the expense of the
applicant, have the site inspected by a qualified individual. By October 1 of each year during
which construction was done on the site, the inspector shall submit a report to the Board
based on that inspection, addressing whether stormwater and erosion control measures (both
temporary and permanent) are in place, are properly installed, and appear adequate. The
report shall also include a discussion and recommendations on any problems which were
encountered.
E. Prior to the sale of any lot, the applicant shall provide the Board with a letter from a
professional land surveyor, stating that all monumentation shown on the Plan has been
installed.
25
F. Upon completion of street construction and prior to a vote by the municipal officers to
submit a proposed public way to a town meeting, a written certification signed by a
professional engineer shall be submitted to the municipal officers at the expense of the
applicant, certifying that the proposed public way meets or exceeds the design and
construction requirements of this Ordinance and is in compliance with the town's road
requirements. If there are any underground utilities, the servicing utility shall certify in
writing that they have been installed in a manner acceptable to the utility. "As built" plans
shall be submitted to the municipal officers.
G. The applicant shall be required to maintain all improvements and provide for snow removal
on streets and sidewalks until acceptance of the improvements by the municipality or control
is placed with a lot owners' association.
9.2 Violations and Enforcement.
A. No plan of a division of land within the municipality which would constitute a subdivision
shall be recorded in the Registry of Deeds until a Final Plan has been approved by the Board
in accordance with this Ordinance.
B. A person shall not convey, offer or agree to convey any land in a subdivision which has not
been approved by the Board and recorded in the Registry of Deeds.
C. A person shall not sell, lease or otherwise convey any land in an approved subdivision which
is not shown on the plan as a separate lot.
D. No public utility, water district, sanitary district or any utility company of any kind shall
serve any lot in a subdivision for which a Final Plan has not been approved by the Board.
E. Development of a subdivision without Board approval shall be a violation of law.
Development includes grading or construction of roads, grading of land or lots, or
construction of buildings which require a Plan approved as provided in this Ordinance and
recorded in the Registry of Deeds.
F. No lot in a subdivision may be sold, leased, or otherwise conveyed before the street upon
which the lot fronts is completed in accordance with this Ordinance up to and including the
entire frontage of the lot. No unit in a multifamily development shall be occupied before the
street upon which the unit is accessed is completed in accordance with this Ordinance.
G. Violations of the above provisions of this section are a nuisance and shall be punished in
accordance with the provisions of Title 30-A M.R.S.A., §4452.
ARTICLE 10 - PERFORMANCE & DESIGN STANDARDS
The performance and design standards in this article are intended to clarify and expand upon the
statutory review criteria found in Article 1, section 2. In reviewing a proposed subdivision, the Board
shall review the application for conformance with the following performance and design standards and
make findings that each has been met prior to the approval of a Final Plan. In all instances, the burden
of proof shall be upon the applicant to present adequate information to indicate all performance and
design standards and statutory criteria for approval have been or will be met.
26
10.1 Basic Subdivision Layout.
A. Utility/Pedestrian Easements
Where street lengths exceed 1,000 feet between intersections with other streets, the Board
may require a utility/pedestrian easement, at least 20 feet in width, to provide for
underground utility crossings and/or a pedestrian pathway of at least five feet in width
constructed in accordance with design standards for pathways below. Maintenance
obligations of the easement shall be included in the written description of the easement.
B. Lots
1. Wherever possible, side lot lines shall be perpendicular to the street.
2. The subdivision of tracts into parcels with more than twice the required
minimum lot size shall be laid out in such a manner as either to provide for or
preclude future division. Deed restrictions and notes on the plan shall either
prohibit future divisions of the lots or specify that any future division shall
constitute a revision to the plan and shall require approval from the Board,
subject to the criteria of the subdivision statute, the standards of this Ordinance
and conditions placed on the original approval.
3. If a lot on one side of a stream (as defined in the DEP Minimum Shoreland
Zoning Guidelines), tidal water, or road fails to meet the minimum
requirements for lot size, it may not be combined with a lot on the other side of
the stream, tidal water, or road to meet the minimum lot size.
4. The ratio of lot length to width, outside of the Shoreland Zone, shall not be
more than three to one (3:1). Flag lots and other odd shaped lots in which
narrow strips are joined to other parcels in order to meet minimum lot size
requirements are prohibited. If any lots in the proposed subdivision have shore
frontage on a river, stream, brook, great pond or coastal wetland as these
features are defined in Title 38, section 480-B, none of the lots created within
the subdivision have a lot depth to shore frontage ratio greater than 5 to 1 (5:1).
5. In areas served by a postal carrier, lots shall be numbered in such a manner as
to facilitate mail delivery. Even numbers shall be assigned to lots on one side
of the street, and odd numbers on the opposite side. Where the proposed
subdivision contains the extension of an existing street or street approved by
the Board, but not yet constructed, the lot numbers shall correspond with the
existing lot numbers. The lot numbering shall be reviewed by the E-911
Addressing Officer and the comments shall be considered by the Board.
C. Utilities -The Board may require underground utilities.
D. Survey Monuments -All subdivision boundary corners and angle points, as well as all lot
boundary corners and angle points shall be marked by suitable (stone or precast cement)
monumentation, as required by the Maine Board of Registration of Land Surveyors.
10.2 Sufficient Water.
A. Water Supply
1. Any subdivision within the area designated in the Comprehensive Plan for
future public water supply service shall make provisions for connection to the
27
public system. A proposed subdivision shall not generate a demand on the
source, treatment facilities or distribution system of the servicing water
company or district beyond the capacity of those system components,
considering improvements that are planned to be in place prior to occupancy of
the subdivision. The applicant shall be responsible for paying the costs of
system improvements to the district's or company's system as necessary in
order to facilitate connection.
2. When a subdivision is to be served by a public water system, the complete
supply system within the subdivision including fire hydrants, shall be installed
at the expense of the applicant. The size and location of mains, gate valves,
hydrants, and service connections shall be reviewed and approved in writing
by the servicing water company or district and the fire chief. Fire hydrants
connected to a public water supply system shall be located no further than 500
feet from any building.
3. When a proposed subdivision is not within the area designated for public water
supply service in the Comprehensive Plan, water supply shall be from
individual wells or a private community water system.
a.
Individual wells shall be sited and constructed to prevent infiltration of
surface water, and contamination from subsurface wastewater disposal
systems and other sources of potential contamination.
i.
The Board shall require a hydrology study to be conducted at the cost of the
applicant.
ii. Wells shall not be constructed within 50 feet of the traveled way of any street,
if located downhill from the street, or within 25 feet of the traveled way of any
street, if located uphill of the street. This restriction shall be included as a
note on the plan and deed restriction to the affected lots.
b. Lot design shall permit placement of wells, subsurface wastewater disposal
areas, and reserve sites for subsurface wastewater disposal areas 200 feet
removed from water wells for dwellings.
c.
If a central water supply system is provided by the applicant, the location
and protection of the source, the design, construction and operation of the
system shall conform to the standards of the Maine Rules Relating to
Drinking Water (10-144A C.M.R. 231).
d. In areas where the Planning Board has identified the need for additional
water storage capacity for firefighting purposes, the applicant shall provide
adequate water storage facilities.
i.
Facilities may be ponds with dry hydrants, underground storage reservoirs or
other methods acceptable to the fire chief.
ii. A minimum storage capacity of 10,000 gallons shall be provided for a
subdivision not served by a public water supply. Additional storage of 2,000
gallons per lot or principal building shall be provided. The Board may require
additional storage capacity upon a recommendation from the Fire Chief.
28
iii. Where ponds are proposed for water storage, the capacity of the pond shall be
calculated based on the lowest water level less an equivalent of three feet of
ice. An easement shall be granted to the municipality granting access to and
maintenance of dry hydrants or reservoirs where necessary.
iv. Hydrants or other provisions for drafting water shall be provided to the
specifications of the fire department. Minimum pipe size connecting dry
hydrants to ponds or storage vaults shall be six inches. A suitable accessway
to the hydrant or other water source shall be constructed.
v.
The Board may waive the requirement for water storage only upon submittal
of evidence that the soil types in the subdivision will not permit their
construction or installation and that the Fire Chief has indicated in writing that
alternate methods of fire protection are available.
B. Water Quality
1. Water supplies shall meet the primary drinking water standards contained in
the Maine Rules Relating to Drinking Water. If existing water quality contains
contaminants in excess of the secondary drinking water standards in the Maine
Rules Relating to Drinking Water, that fact shall be disclosed in a note on the
plan to be recorded in the Registry of Deeds.
10.3 Erosion and Sedimentation and Impact on Water Bodies.
A. The proposed subdivision shall prevent soil erosion and sedimentation from entering water
bodies, wetlands, and adjacent properties.
B. The procedures outlined in the erosion and sedimentation control plan shall be implemented
during the site preparation, construction, and clean-up stages.
C. Cutting or removal of vegetation along water bodies shall not increase water temperature or
result in shoreline erosion or sedimentation.
D. Topsoil shall be considered part of the subdivision and shall not be removed from the site
except for surplus topsoil from roads, parking areas, and building excavations.
10.4 Sewage Disposal.
A. Public System
1. Any subdivision within the area designated in the Comprehensive Plan for
future public sewage disposal service shall be connected to the public system.
2. When a subdivision is proposed to be served by the public sewage system, the
complete collection system within the subdivision, including manholes and
pump stations, shall be installed at the expense of the applicant.
3. The sewer district shall certify that providing service to the proposed
subdivision is within the capacity of the system's existing collection and
treatment system or improvements planned to be complete prior to the
construction of the subdivision.
4. The sewer district shall review and approve the construction drawings for the
sewerage system. The size and location of laterals, collectors, manholes, and
29
pump stations shall be reviewed and approved in writing by the servicing
sewer district or department.
B. Private Systems
1. When a proposed subdivision is not within the area designated for public
sewage disposal service in the Comprehensive Plan, connection to the public
system shall not be permitted. Sewage disposal shall be private subsurface
wastewater disposal systems or a private treatment facility with surface
discharge, licensed by the Department of Environmental Protection.
2. The applicant shall submit evidence of site suitability for subsurface sewage
disposal prepared by a Maine Licensed Site Evaluator in full compliance with
the requirements of the State of Maine Subsurface Wastewater Disposal Rules.
a.
The site evaluator shall certify in writing that all test pits which meet the
requirements for a new system represent an area large enough to a disposal
area on soils which meet the Disposal Rules.
b. On lots in which the limiting factor has been identified as being within 24
inches of the surface, a second site with suitable soils shall be shown as a
reserve area for future replacement of the disposal area. The reserve area
shall be shown on the plan and restricted in the deed so as not to be built
upon.
c.
In no instance shall a disposal area be on a site which requires a New
System Variance from the Subsurface Wastewater Disposal Rules.
10.5 Solid Waste.
If the additional solid waste from the proposed subdivision exceeds the capacity of the municipal
solid waste facility, causes the municipal facility to no longer be in compliance with its license
from the Department of Environmental Protection, or causes the municipality to exceed its
contract with a non-municipal facility, the applicant shall make alternate arrangements for the
disposal of solid waste. The alternate arrangements shall be at a disposal facility which is in
compliance with its license. The Board may not require the alternate arrangement to exceed a
period of five years.
10.6 Impact on Natural Beauty, Aesthetics, Historic Sites, Wildlife Habitat, Rare Natural Areas or
Public Access to the Shoreline.
A. Preservation of Natural Beauty and Aesthetics
1. The plan shall, by notes on the Final Plan and deed restrictions, limit the
clearing of trees to those areas designated on the Comprehensive Plan.
2. Except in areas of the municipality designated by the Comprehensive Plan as
growth areas, the subdivision shall be designed to minimize the visibility of
buildings from existing public roads. Outside of designated growth areas, a
subdivision in which the land cover type at the time of application is forested,
shall maintain a wooded buffer strip no less than fifty feet in width along all
existing public roads. The buffer may be broken only for driveways and streets.
30
3. The Board may require the application to include a landscape plan that will
show the preservation of any existing large specimen trees, the replacement of
trees and vegetation, and graded contours.
4. Unless located in areas designated as a growth area in the Comprehensive Plan,
building location shall be restricted from open fields, and shall be located
within forested portions of the subdivision. When the subdivision contains no
forest or insufficient forested portions to include all buildings, the subdivision
shall be designed to minimize the appearance of buildings when viewed from
existing public streets. Earth berms may be used unless they would block a
scenic view from a public right-of-way. When a proposed subdivision street
traverses open fields, the plan shall include the planting of street trees. Street
trees shall include a mix of tall shade trees and medium height flowering
species. Trees shall be planted no more than fifty feet apart.
5. When a proposed subdivision contains a ridge line identified by the Planning
Board as a visual resource to be protected, the plan shall restrict tree removal
and prohibit building placement within fifty (50) feet vertical distance of the
ridge top. These restrictions shall appear as notes on the plan and as covenants
in the deed.
B. Retention of Open Spaces and Natural or Historic Features
1. If any portion of the subdivision is located within an area designated by the
Comprehensive Plan as open space or greenbelt, that portion shall be reserved
for open space preservation.
2. If any portion of the subdivision is located within an area designated as a
unique natural area by the Comprehensive Plan or the Maine Natural Areas
Program the plan shall indicate appropriate measures for the preservation of
the values which qualify the site for such designation.
3. If any portion of the subdivision is designated a site of historic or prehistoric
importance by the Comprehensive Plan, National Register of Historic Places,
or the Maine Historic Preservation Commission, appropriate measures for the
protection of the historic or prehistoric resources shall be included in the plan.
When the historic features to be protected include buildings, the placement and
the architectural design of new structures in the subdivision shall be similar to
the historic structures. The Board shall seek the advice of the Maine Historic
Preservation Commission in reviewing such plans.
4. The subdivision shall reserve sufficient undeveloped land to provide for the
recreational needs of the occupants. The percentage of open space to be
reserved shall depend on the identified needs for outdoor recreation in the
portion of the municipality in which the subdivision is located according to the
Comprehensive Plan, the proposed lot sizes within the subdivision, the
expected demographic makeup of the occupants of the subdivision, and the site
characteristics, but shall constitute no less than 5% of the area of the
31
subdivision. In determining the need for recreational open space the Board
shall also consider the proximity of the subdivision to neighboring dedicated
open space or recreation facilities; and the type of development. Sites selected
primarily for scenic or passive recreation purposes shall have such access as
the Board may deem suitable and no less than 25 feet of road frontage.
5. Land reserved for open space purposes shall be of a character, configuration
and location suitable for the particular use intended.
6. Reserved open space land may be dedicated to the municipality.
7. Where land within the subdivision is not suitable or is insufficient in amount,
and when suggested by the Comprehensive Plan, a payment in lieu of
dedication may be substituted for the reservation of some or part of the open
space requirement. Payments in lieu of dedication shall be calculated based on
the percentage of reserved open space that otherwise would be required and
that percentage of the projected market value of the developed land at the time
of the subdivision, as determined by the municipal tax assessor. The payment
in lieu of dedication shall be deposited into a municipal land open space or
outdoor recreation facility acquisition or improvement fund.
C. Protection of Significant Wildlife Habitat
If any portion of a proposed subdivision lies within:
1. 250 feet of the following areas identified and mapped by the Department of
Inland Fisheries and Wildlife Beginning with Habitat Project or the
Comprehensive Plan as:
a.
Habitat for species appearing on the official state or federal lists of
endangered or threatened species;
b. High and moderate value waterfowl and wading bird habitats, including
nesting and feeding areas;
c.
Shorebird nesting, feeding and staging areas and seabird nesting islands;
d. Critical spawning and nursery areas for Atlantic sea run salmon or other
anadromous fish as defined by the Maine Department of Inland Fisheries
and Wildlife;
2. 1,320 feet of an area identified and mapped by the Department of Inland
Fisheries and Wildlife as a high or moderate value deer wintering area or travel
corridor;
3. Or other important habitat areas identified in the Comprehensive Plan or in the
Department of Inland Fisheries and Wildlife Beginning with Habitat Project; or
any such area identified by the town.
The applicant shall demonstrate that there shall be no adverse impacts on the habitat and
species it supports. There shall be no cutting of vegetation within such areas, or within the
strip of land extending at least 75 feet from the edge or normal high-water mark of such
habitat areas. The applicant must consult with the Maine Department of Inland Fisheries and
32
Wildlife, and provide their written comments to the Board. The Board may require a report to
be submitted, prepared by a wildlife biologist, selected or approved by the Board, with
demonstrated experience with the wildlife resource being impacted. This report shall assess
the potential impact of the subdivision on the significant habitat and adjacent areas that are
important to the maintenance of the affected species and shall describe any additional
appropriate mitigation measures to ensure that the subdivision will have no adverse impacts
on the habitat and the species it supports.
D. Protection of Important Shoreland Areas
1. Any existing public rights of access to the shoreline of a water body shall be
maintained by means of easements or rights-of-way, or should be included as
open space with provisions made for continued public access.
2. Within areas subject to the state mandated Shoreland Zone, within a strip of
land extending 250 feet inland from the normal high-water line of Fresh Pond
or any tributary to Fresh Pond, and 75 feet from any other water body or the
upland edge of a wetland, a buffer strip of vegetation shall be preserved. The
plan notes, and deeds to any lots which include any such land, shall contain the
following restrictions:
a.
Tree removal shall be limited to no more than 40% of the volume of trees 4
inches or more in diameter measured at 4 1/2 feet above the ground level
on any lot in any ten year period.
b. There shall be no cleared opening greater than 250 square feet in the forest
canopy as measured from the outer limits of the tree crown.
c.
However, a footpath not to exceed ten feet in width as measured between
tree trunks is permitted provided that a cleared line of sight to the water
through the buffer strip is not created. Adjacent to Fresh Pond, or a
tributary to Fresh Pond, the width of the foot path shall be limited to six
feet.
d. In order to protect water quality and wildlife habitat adjacent to Fresh
Pond, and tributaries to Fresh Pond, existing vegetation under three feet in
height and other ground cover shall not be removed, except to provide for a
footpath or other permitted uses as described above.
e.
Pruning of tree branches, on the bottom third of the tree is permitted.
3. Within areas subject to the state mandated Shoreland Zone, beyond the buffer
strip designated above, and out to 250 feet from the normal high water line of a
water body or upland edge of a wetland, cleared openings for development,
including but not limited to, principal and accessory structures, driveways and
sewage disposal areas, shall not exceed in the aggregate, 25% of the lot area or
10,000 square feet, whichever is greater, including land previously developed.
E. Reservation or Dedication and Maintenance of Open Space and Common Land, Facilities
and Services
1. All open space common land, facilities and property shall be owned by:
33
a.
The owners of the lots or dwelling units by means of a lot owners'
association; or
b. An association which has as its principal purpose the conservation or
preservation of land in essentially its natural condition; or
c.
The Town of North Haven.
2. Further subdivision of the common land or open space and its use for other
than non-commercial recreation, agriculture, or conservation purposes, except
for easements for underground utilities, shall be prohibited. Structures and
buildings accessory to non-commercial recreation, agriculture or conservation
uses may be erected on the common land. When open space is to be owned by
an entity other than the subdivision, there shall be a conservation easement
deeded a land trust or other conservation organization.
3. The common land or open space shall be shown on the Final Plan with
appropriate notations on the plan to indicate:
a.
It shall not be used for future building lots; and
b. Which portions of the open space, if any, may be dedicated for acceptance
by a land trust or similar conservation organization.
4. The Final Plan application shall include the following:
a.
Covenants for mandatory membership in the lot owners' association setting
forth the owners' rights, interests, and privileges in the association and the
common property and facilities, to be included in the deed for each lot or
dwelling;
b. Draft articles of incorporation of the proposed lot owners' association as a
not-for-profit corporation; and
c.
Draft by-laws of the proposed lot owners' association specifying the
responsibilities and authority of the association, the operating procedures
of the association and providing for proper capitalization of the association
to cover the costs of major repairs, maintenance and replacement of
common facilities.
5. In combination, the documents referenced in paragraph E4, above shall
provide for the following.
a.
The homeowners' association shall have the responsibility of maintaining
the common property or facilities.
b. The association shall levy annual charges against all owners of lots or
dwelling units to defray the expenses connected with the maintenance,
repair and replacement of common property and facilities and tax
assessments.
c.
The association shall have the power to place a lien on the property of
members who fail to pay dues or assessments.
d. The applicant shall maintain control of the common property, and be
responsible for its maintenance until development sufficient to support the
34
association has taken place. Such determination shall be made by the
Board upon request of the lot owners' association or the developer.
10.7 Conformance with Zoning Ordinance and Other Land Use Ordinances.
All lots, other than those found within cluster developments approved pursuant to section 10.13,
shall meet the minimum dimensional requirements of the zoning ordinance for the zoning district
in which they are located. The proposed subdivision shall meet all applicable performance
standards or design criteria from the zoning ordinance and other land use ordinances.
10.8 Financial and Technical Capacity.
A. Financial Capacity
The applicant shall have adequate financial resources to construct the proposed improvements
and meet the criteria of the statute and the standards of this Ordinance. When the applicant
proposes to construct the buildings as well as the subdivision improvements, the applicant shall
have adequate financial resources to construct the total development. In making the above
determinations the Board shall consider the proposed time frame for construction and the effects
of inflation.
B. Technical Ability
1. The applicant shall retain qualified contractors and consultants to supervise,
construct and inspect the required improvements in the proposed subdivision.
2. In determining the applicant's technical ability the Board shall consider the
applicant's previous experience, the experience and training of the applicant's
consultants and contractors, and the existence of violations of previous
approvals granted to the applicant.
3. The applicant shall provide a curriculum vitae with references to the Board for
all contractors and consultants.
10.9 Impact on Ground Water Quality or Quantity.
A. Ground Water Quality
1. When a hydrogeologic assessment is submitted, the assessment shall contain at
least the following information:
a.
A map showing the basic soils types,
b. The depth to the water table at representative points throughout the
subdivision,
c.
Drainage conditions throughout the subdivision,
d. Data on the existing ground water quality, either from test wells in the
subdivision or from existing wells on neighboring properties,
e.
An analysis and evaluation of the effect of the subdivision on ground water
resources. In the case of residential developments, the evaluation shall, at a
minimum, include a projection of post development nitrate-nitrogen and
salinization concentrations at any wells within the subdivision, or at the
subdivision boundaries; or at a distance of 1,000 feet from potential
contamination sources, whichever is a shortest distance,
35
f.
A map showing the location of any subsurface wastewater disposal systems
and drinking water wells within the subdivision and within 200 feet of the
subdivision boundaries.
2. Projections of ground water quality shall be based on the assumption of
drought conditions (assuming 60% of annual average precipitation).
3. No subdivision shall increase any contaminant concentration in the ground
water to more than one half of the Primary Drinking Water Standards. No
subdivision shall increase any contaminant concentration in the ground water
to more than the Secondary Drinking Water Standards.
4. If pre-development ground water contains contaminants in excess of the
primary standards, and the subdivision is to be served by on-site groundwater
supplies, the applicant shall demonstrate how water quality will be improved
or treated.
5. If pre-development ground water contains contaminants in excess of the
secondary standards, the subdivision shall not cause the concentration of the
parameters in question to exceed 150% of the ambient concentration.
6. Subsurface wastewater disposal systems and drinking water wells shall be
constructed as shown on the map submitted with the assessment. If
construction standards for drinking water wells or other measures to reduce
groundwater contamination and protect drinking water supplies are
recommended in the assessment, those standards shall be included as a note on
the Final Plan, and as restrictions in the deeds to the affected lots.
B. Groundwater Quantity
1. Ground water withdrawals by a proposed subdivision shall not lower the water
table beyond the boundaries of the subdivision.
2. A proposed subdivision shall not result in a lowering of the water table at the
subdivision boundary by increasing runoff with a corresponding decrease in
infiltration of precipitation.
10.10 Floodplain Management.
When any part of a subdivision is located in a special flood hazard area as identified by the
Federal Emergency Management Agency:
A. All public utilities and facilities, such as sewer, gas, electrical and water systems shall be
located and constructed to minimize or eliminate flood damages.
B. Adequate drainage shall be provided so as to reduce exposure to flood hazards.
C. The plan shall include a statement that structures in the subdivision shall be constructed with
their lowest floor, including the basement, at least one foot above the 100-year flood
elevation. Such a restriction shall be included in any deed, lease, purchase and sale
agreement, or document transferring or expressing an intent to transfer any interest in real
estate or structure, including but not limited to a time-share interest. The statement shall
clearly articulate that the municipality may enforce any violation of the construction
requirement and that fact shall also be included in the deed or any other document previously
described. The construction requirement shall also be clearly stated on the plan.
36
10.11 Identification of Freshwater Wetlands, Rivers, Streams or Brooks.
Freshwater wetlands within the proposed subdivision shall be identified in accordance with the
2009 Interim Regional Supplement to the Corps of Engineers Wetland Delineation Manual:
Northcentral and Northeast Region published by the United States Army Corps of Engineers, or
any subsequent Delineation Manual. Any rivers, streams, or brooks within or abutting the
proposed subdivision shall be identified.
10.12 Stormwater Management.
A. For subdivisions that require a DEP review under the Site Location of Development Act
(SLDA), a stormwater management plan shall be submitted which complies with the SLDA
permit and the requirements of DEP Chapter 500 Stormwater Regulations.
B. For subdivisions that do not require a SLDA permit, but require a DEP permit under the
Stormwater Law, a stormwater management plan shall be submitted which complies with the
requirements of DEP Chapter 500 Stormwater Regulations.
C. For subdivisions outside of the watershed of Fresh Pond, that neither require a SLDA permit,
nor a DEP permit under the Stormwater Law, a stormwater management plan shall be
submitted which incorporates Low Impact Development techniques on each individual lot, as
described in the Maine Low Impact Development Ordinance (midcoastplanning.org).
D. For subdivisions within the watershed of Fresh Pond, the Resource Protection Ordinance
applies.
E. The Planning Board shall require a hydrologic analysis for any site in areas with a history of
flooding or in areas with a potential for future flooding, associated with cumulative impacts
of development. This hydrologic analysis would be in the form of a "Downstream Analysis"
under conditions of the 10-year, 24-hour storm and the 25-year, 24-hour storm, and the 100-
year, 24-hour storm, as described below:
Downstream Analysis Methodology
The criteria used for the downstream analysis is referred to as the "10% rule."
Under the 10% rule, a hydrologic and hydraulic analysis for the 10-year, 24 hour
storm and the 25-year, 24-hour storm, and the 100-year, 24-hour storm is
extended downstream to the point where the site represents 10% of the total
drainage area. For example, a 10-acre site would be analyzed to the point
downstream with a drainage area of 100 acres. This analysis should compute
flow rates and velocities downstream to the location of the 10% rule for present
conditions and proposed conditions. If the flow rates and velocities increase by
more than 5% and/or if any existing downstream structures are impacted, the
designer should redesign and incorporate detention facilities.
10.13 Cluster Developments.
A. Purpose, Mandate for Clustering
1. The purpose of these provisions is to allow for flexibility in the design of
housing developments to allow for the creation of open space which provides
recreational opportunities or protects important natural features from the
adverse impacts of development, provided that the net residential density shall
be no greater than is permitted in the district in which the development is
37
proposed. Notwithstanding provisions of the zoning ordinance relating to
dimensional requirements, the Board, in reviewing and approving proposed
residential subdivisions, may modify the provisions related to dimensional
requirements to permit flexibility in approaches to housing and environmental
design in accordance with the following guidelines. This shall not be
construed as granting variances to relieve hardship, and action of the Zoning
Board of Appeals shall not be required.
2. Subdivisions proposed in the Village district, containing five (5) lots or units or
more, may include a cluster and a traditional development plan. Subdivisions
proposed in the rural or Shoreland Zoning districts, containing five (5) lots or
units or more, shall include both a cluster and a traditional development plan.
The Planning Board shall review both plans and determine which is the more
appropriate for the site.
B. Basic Standards for Cluster Developments
1. Cluster developments shall meet all requirements of this Ordinance.
2. Each building shall be an element of an overall plan for site development.
Only developments having a total site plan for all structures will be considered.
The application shall illustrate the placement of buildings and the treatment of
spaces, paths, roads, service and parking and in so doing shall take into
consideration all requirements of this section and of other relevant sections of
this Ordinance.
3. The Planning Board shall allow lots within cluster developments to be reduced
in lot area, street frontage and lot width below the minimum normally required
by this Ordinance in return for provision of common open space, as long as the
maximum number of dwelling units is not exceeded, according to the
calculations in section 4 below.
4. In order to determine the maximum number of dwelling units permitted on a
tract of land, the net residential acreage as determined in section 5 shall be
divided by the minimum lot size in the district, as required by the zoning
ordinance. No building in the cluster development shall be sited on slopes
steeper than 25%, within 100 feet of any water body or wetland, or on soil
classified as being very poorly drained.
5. The net residential acreage shall be calculated by taking the total area of the lot
and subtracting, in order, the following:
a.
15% of the area of the lot to account for roads and parking.
b. Portions of the lot shown to be in a floodway or a coastal high hazard zone
as designated in the Flood Boundary and Floodway Map prepared by the
Federal Insurance Administration.
c.
Portions of the lot which are unsuitable for development in their natural
state due to topographical, drainage or subsoil conditions such as, but not
limited to:
i.
slopes greater than 20%;
38
ii. wetland soils;
iii. portions of the lot subject to rights of way;
iv. portions of the lot located in the resource protection zone;
v.
portions of the lot covered by surface waters; and
vi. portions of the lot utilized for stormwater management facilities.
6. Unless a community sewage collection and treatment system is provided, no
lot or area of occupation, in the case of a condominium, shall be smaller in area
than 20,000 square feet.
7. The total area of reserved open space within the development shall equal or
exceed the sum of the areas by which any building lots are reduced below the
minimum lot area normally required by the zoning ordinance. However, at
least fifty percent (50%) of the area of the entire parcel or tract shall be
included as common open space. Common open space shall not include road
rights of way, streets, drives, or parking. No more than fifty percent (50%) of
the common open space shall consist of forested or open wetlands of any size.
8. Every building lot that is reduced in area below the amount normally required
shall be within 1,000 feet of the common land.
9. The distance between buildings shall not be less than 20 feet.
10. No individual lot or dwelling unit shall have direct vehicular access onto a
public road existing at the time of development.
11. Shore frontage for each lot or area of occupation, in the case of a
condominium, shall not be reduced below the minimum normally required by
the zoning ordinance.
12. Where a cluster development abuts a body of water, a usable portion of the
shoreline, as well as reasonable access to it, shall be a part of the common
land.
13. The common open space shall owned and managed according to the standards
of 10.6.E.
14. The applicant shall be responsible for the maintenance of the common open
space and the other common facilities, until 4/5ths of the lots or units are sold.
The transfer of responsibility shall occur only after review and approval by the
Planning Board, upon request by the neighborhood association or the
developer or applicant.
10.14 Year-Round Housing Qualifications For Waivers And Density Bonus.
A. Purpose
The purpose of this section is to implement certain housing strategies of the Town's
Comprehensive Plan, with the goal of ensuring at least 10% of the total housing stock in North
Haven is affordable to year-round residents earning 250% of the Knox County median income or
less. To that end, the standards and criteria below are provided to increase development potential
for year-round housing on the island.
39
B. Land Use Requirements
The increased density and other relaxed standards provided below may be granted by the
Planning Board in the form of waivers from the relevant standards of the current Land Use
Ordinance and are permissible only for subdivision proposals intended to create qualified Year-
round Housing Unit, as defined, in at least a 3/4 proportion of the total number of dwelling units
proposed in the same subdivision plan.
1. Resource Protection
a.
No more than 50% of the property proposed to be subdivided shall be
within the Shoreland Zone.
b. No more than 50% of the property proposed to be subdivided shall contain
sustained slopes of 10% or greater.
c.
No more than 50% of the property proposed to be subdivided shall contain
wetlands, as defined.
2. Subdivision Design
The configuration of structures and open spaces shall reflect the purpose of this section
and meet all other relevant requirements of this Ordinance and the Land Use Ordinance,
unless appropriate waivers are granted by the Planning Board. The plan shall show the
location and size of all building envelopes, roads, utility easements, common areas,
common structures, parking areas, footpaths, and private yard space related to individual
residential units.
a.
Multiple Structures: When the construction of multiple buildings is
proposed on a single lot, the plan shall indicate the purpose and show the
general location of each building. Accessory structures shall not contain
dwelling units.
b. Multiple Dwellings: When the construction of multiple dwelling units is
proposed on a single lot, they shall be contained within a single building.
There can be no more than two dwelling units per lot.
3. Dimensional Standards
a.
Density: A decrease in the minimum lot size of up to 50% of the
requirement in effect in the underlying zoning district may be granted by
the Planning Board.
b. Lot Coverage: An increase in the maximum lot coverage requirement may
be granted by the Planning Board as follows:
i.
up to 75% in the Village District
ii. up to 50% in all other zoning districts
c.
Road Frontage: A decrease in the minimum road frontage requirement may
be granted by the Planning Board, if the Board finds that safe and
convenient access to dwelling units can be provided, except that the lot
over which the main access road lies shall meet the required road frontage
for the underlying zoning district.
40
d. Roadways: Reduction of required minimum street widths as determined by
the Planning Board to provide safe and convenient access to dwellings.
e.
Setbacks: A decrease in the minimum side and rear setback requirements
for the internal lot lines may be granted by the Planning Board. However,
with respect to external lot lines, adjacent to parcels not included in the
subdivision, the Planning Board may not provide relief from the minimum
setback requirements for the underlying zoning district.
f.
Height: The Planning Board may not provide relief from the maximum
height requirements of the zoning district where a proposed structure is
located.
4. Common Land and Facilities
The Planning Board must approve any provisions for the maintenance and upkeep of
common land and facilities within the proposed subdivision. All shared passive or active
recreation areas, wastewater facilities, wells and solid waste removal provisions must be
provided for in a homeowner's association document, which shall be recorded with the
subdivision plan, and provide for adequate financing to ensure proper maintenance and
repair.
C. Requirements for Marketability
The Year-round Housing requirements of this Section are mandatory and shall be noted on
the final subdivision plan prior to recording in the Knox County Registry of Deeds.
1. Year-round Housing Lots/Units shall be rented or sold to income qualified
renters or buyers. The applicant and income qualified buyers who later wish to
resell shall initially attempt to sell the property to income qualified buyers by
marketing the lot/unit in a manner calculated to attract such buyers. If no
income qualified buyer purchases
the lot/unit within one hundred eighty (180) days after such marketing
commences, the seller or seller's representative may:
a.
Rent the Year-round Housing Lot/Unit to income qualified tenants;
b. Rent the Year-round Housing Lot/Unit to non-income qualified tenants,
provided that an option to purchase is offered either to:
i.
The Town, for consideration at the next available Town Meeting;
ii. A non-profit third party dedicated to the creation or management of Year-
round housing;
c.
Sell the Year-round Housing Lot/Unit to non-income qualified buyers,
provided that marketing the property for sale to income qualified buyers
has been attempted for at least 12 months, in a manner calculated to attract
such buyers.
2. At a minimum, the applicant/seller shall advertise the Year-round Housing
Lots/Units for sale widely online, on local bulletin boards, and in a newspaper
of general circulation in the Town.
41
3. Year-round Housing Lots/Units shall be proportionately dispersed throughout
the subdivision, where feasible, if market-rate housing is also present or
proposed.
4. Year-round Housing Lots/Units shall be compatible (in size and appearance)
with any market-rate house in the subdivision.
5. The applicant shall present an agreement with a non-profit organization for
Town Attorney review and comment the proposed language of covenants
which preserve the long-term affordability of the Year-round Housing Lot/
Units. The covenant shall be either a second mortgage, deed restriction or a
combination of the two. The Planning Board shall require such covenants to
include all of the following:
a.
A method to preserve long-term (99 years) affordability to income
qualified buyers;
b. A formula for accruing limited equity to the buyer which includes some but
not all of the value of physical improvements made to the property by the
buyer or future owners;
c.
The supervision of the agreement by a non-profit organization dedicated, in
whole or in part, to providing housing to income qualified persons, and
provisions for succession.
6. Year-round Housing Lots/Units shall be constructed and completed at least
concurrently with the remainder of the project. In a subdivision approved
under this Section, no Land Use permit shall be issued for market rate units in
excess of the approved proportion as stated in Article 10.14 B.
7. The Year-round Housing provisions of this Ordinance are mandatory, shall be
excerpted on the recorded plan in a manner that is satisfactory to the Planning
Board, and shall run with the land.
10.15 Compliance with Timber Harvesting Rules.
The Board shall require the applicant to provide certification by a licensed forester to
demonstrate that they are in compliance with rules adopted pursuant to Title 12, M.R.S.A section
8869, subsection 14. If a violation of rules adopted by the Maine Forest Service to substantially
eliminate liquidation harvesting has occurred, the Planning Board must determine prior to
granting approval for the subdivision that 5 years have elapsed from the date the landowner
under whose ownership the harvest occurred acquired the parcel. The Planning Board may
request technical assistance from the Department of Conservation, Bureau of Forestry to
determine whether a rule violation has occurred, or the Board may accept a determination
certified by a forester licensed pursuant to Title 32, chapter 76. If the Bureau agrees to provide
assistance, it shall make a finding and determination as to whether a rule violation has occurred.
If the Bureau notifies the Planning Board that it will not provide assistance, the Board may
require a subdivision applicant to provide a determination certified by a licensed forester. For
the purposes of this subsection, "liquidation harvesting" has the same meaning as in Title 12,
M.R.S.A section 8868, subsection 6 and "parcel" means a contiguous area within one
municipality, township or plantation owned by one person or a group of persons in common or
joint ownership.
42
10.16 Traffic Conditions and Streets.
A. General Standards
The proposed subdivision shall meet the following general transportation performance
standards:
1. The subdivision transportation system shall provide safeguards against hazards
to vehicles, bicyclists and pedestrians in interior subdivision streets and access
connections to external streets;
2. The subdivision transportation system shall have design standards that avoid
traffic congestion on any street;
3. The subdivision transportation system shall provide safe and convenient
circulation for vehicles, bicyclists and pedestrians on interior subdivision
streets and access connections to external streets;
4. The subdivision transportation system shall have design standards that are
compatible with the estimated Average Annual Daily Traffic of the street, the
land uses accommodated by the street, and the lot density of the street; and
5. The subdivision transportation system shall have a positive relationship to the
natural setting of the proposed subdivision site.
B. General Access Standards
All subdivision accesses connecting with external streets shall meet the following standards:
1. Accesses connecting to any state or state-aid road shall meet the minimum
access permitting requirements of the Maine Department of Transportation
"Highway Driveway and Entrance Rules". The street giving access to the
subdivision and neighboring streets and intersections which can be expected to
carry traffic generated by the subdivision shall have the capacity or be suitably
improved to accommodate that traffic and avoid unreasonable congestion. The
current roads of North Haven are at Level of Service A.
2. As all the intersections on North Haven are unsignalized, the municipal
reviewing authority may reduce the mitigation requirement for those measures
so long as the resulting traffic conditions provide for safe traffic movement.
C. General Internal Subdivision Street Standards
1. All internal subdivision streets shall meet the following minimum standards.
In cases where the internal subdivision street standards conflict with the street
ordinance of the municipality, the more stringent rule shall apply.
2. The street or street system of the proposed subdivision shall be designed to
coordinate with existing, proposed, and planned streets. Wherever a proposed
development abuts unplatted land or a future development phase of the same
development, street stubs shall be provided as deemed necessary by the
municipality to provide access to abutting properties or to logically extend the
street system. All street stubs shall be provided with temporary turn around or
cul-de-sacs unless specifically exempted by the Road Commissioner, and the
restoration and expansion of the street shall be the responsibility of any future
developer of the abutting land. Minor collector and local streets shall connect
43
with surrounding streets to permit convenient movement of traffic between
residential neighborhoods or facilitate emergency access and evacuation, but
such connections shall not be permitted where the effect would be to
encourage the use of such streets by substantial through traffic. Where
necessary to safeguard against hazards to vehicle drivers, bicyclists and
pedestrians and/or to avoid traffic congestion, provision shall be made for
turning lanes, traffic directional islands, frontage roads, sidewalks, cycleways,
transportation demand management techniques, and traffic controls within
existing public streets.
3. Street Names, Signs and Lighting: Streets which join and are in alignment with
streets of abutting or neighboring properties shall bear the same name. Names
of new streets shall not duplicate, nor bear phonetic resemblance to the names
of existing streets within the municipality, and shall be subject to the approval
of the Board. No street name shall be the common given name of a person.
The developer shall either install street name, traffic safety and control signs
meeting municipal specifications or reimburse the municipality for the costs of
their installation. Street lighting shall be installed as approved by the Board.
4. During street construction, the entire right of way shall not be cleared unless
clearing is necessary for utilities, drainage or other infrastructure necessities
beyond the clear zone. Following street construction, the developer or
contractor shall conduct a thorough clean-up of stumps and other debris from
the entire right of way created during the street construction process. If on-site
disposal of the stumps and debris is proposed, the site shall be indicated on the
plan, and be suitably covered with fill and topsoil, limed and seeded.
10.17 Specific Access and Street Design Standards.
A. Access Control
1. To the maximum extent practical, all subdivision accesses shall be constructed
perpendicular to the external street providing access to the subdivision. No
subdivision accesses shall intersect the external street at an angle of less than
60 degrees.
2. Where a subdivision abuts or contains an existing or proposed arterial street,
no lot may have vehicular access directly to the arterial street. This
requirement shall be noted on the plan and in the deed of any lot with frontage
on the arterial street.
3. Where a lot has frontage on two or more streets, the access to the lot shall be
provided to the lot across the frontage and to the street where there is lesser
potential for traffic congestion and for hazards to traffic and pedestrians. This
restriction shall appear as a note on the plan and as a deed restriction to the
affected lots. In cases where creating an access to a lesser traveled way is
problematic, the Board may allow an access on the higher volume street if the
access does not significantly detract from public safety. For accesses on higher
volume streets, the Board shall consider the functional classification of the
external street, the length of frontage on the external street, the intensity of
44
traffic generated by the proposed subdivision, the geography along the frontage
of the public way with lesser potential for traffic, and the distance to the public
way with lesser potential for traffic.
4. Lots in subdivisions with frontage on a state or state aid highway shall have
shared access points to and from the highway. Normally a maximum of two
accesses shall be allowed regardless of the number of lots or businesses served.
5. The subdivision access including all radii must be paved from the edge of
pavement of the external street to the street right of way or the length of the
design vehicle using the subdivision, whichever is greater, unless:
a.
the external street is not paved; or
b. the internal subdivision street is an unpaved private street that is expected
to carry an Average Daily Traffic capacity of 50 trips or less.
6. Minimum Sight Distance Standards: Minimum sight distance requirements for
all subdivision accesses connecting to external streets shall be contingent on
the posted speed of the external street connecting to the subdivision access.
For accesses that are expected to carry primarily passenger vehicles, the
standards in the second column in Table 10.17-1 shall apply.
TABLE 10.17-1
On roads that are designated by the Maine Department of Transportation as
Mobility or Retrograde Arterials, the third column in Table 10.17-1 shall apply.
7. Access design shall be based on the traffic volume estimates anticipated to be
carried by the internal subdivision street. Traffic volume estimates shall be
defined by the latest edition of the Trip Generation Manual published by the
Institute of Transportation Engineers. The following traffic volume standards
shall apply to the design of subdivision accesses connecting to external streets:
a.
Low Volume Access: An access with 50 or less passenger car equivalent
trips per day.
Minimum Sight Distance Standards for Subdivision Accesses
Posted Speed
Sight Distance
Standard Vehicles
Sight Distance
Large Vehicles
Mobility
Sight Distance
(MPH)
(Feet)
(Feet)
(Feet)
20
155
230
Not applicable
25
200
300
Not applicable
30
250
375
Not applicable
35
305
455
Not applicable
40
360
540
580
45
b. Medium Volume Access: Any access with more than 50 passenger car
equivalent trips per day but less than 100 passenger car equivalent trips
during the peak hour.
c.
High Volume Access: Any access with 100 or more passenger car
equivalent trips during the peak hour.
8. Basic Access Design Standards for Low and Medium Volume Accesses: the
following minimum access design standards shall apply to all low and medium
volume accesses connecting to external streets:
TABLE 10.17-2
Access Design Standards for Low and Medium Volume Accesses
Basic Standards
Low Volume
Medium Volume
(feet)
(feet)
Minimum Access
Width:*
Majority Passenger
Vehicles
14
22
>30% Large
Vehicles
30
30
Minimum Curb
Radius:
Majority Passenger
Vehicles
10
15
>30% Large
Vehicles
15
15
Minimum Corner
Clearance to: **
Unsignalized
Intersection
75
100
Minimum Access
Spacing***
MPH of External
Road
35 or less
No requirement
No Requirement
40
175
175
46
9. Additional Access Requirements for Medium Volume Accesses: In addition to
the basic access standards outlined in 10.17-2, medium volume accesses on
state or state-aid highways designated as Major Collectors or Arterials shall
also comply with the following standards:
a.
The minimum curb radius on the edge of the access shall exceed the
minimum curb radius standard in 10.17-2 if a larger design radius is needed
to accommodate a larger design vehicle.
b. A throat shall be constructed around the access in order to store vehicles
waiting to exit the access. The throat shall be of sufficient length to
prevent incoming vehicles from queuing back into the highway. Access
from the throat to parking or other areas shall be prohibited.
c.
A separator strip or strip of land that separates the roadway from the throat
or parking area shall be constructed. The access separator strips shall be
installed between the parking area and the roadway and along the throat.
The Board shall determine if the separator strip shall include curbing,
walkways, ditching, and/or vegetation. The separator strip shall extend
away from the highway at a minimum of 9 feet from the traveled way of
the external road.
d. The Board shall determine if one two-way or two one-way access(es) will
be required for the proposed subdivision. If a one-way system is required
and the predominant traffic volume is truck traffic, the entrance will be
configured on the minimum angle that permits the truck to enter or leave
the highway safely and conveniently. Otherwise all one way accesses will
be configured perpendicular to the highway for at least the length of the
design vehicle. For one-way access systems, the Board shall determine if a
physical separation of curbing, ditching, grass or other landscaping must be
used between the two one-way accesses. Both portions of a one-way
access must be separated from another one-way access by at least 12 feet.
B. Street Design and Construction Standards
1. General Requirements
a.
The Board shall not approve any subdivision plan unless any proposed
streets are designed in accordance with local ordinances. Approval of the
Final Plan by the Board shall not be deemed to constitute or be evidence of
acceptance by the municipality of any street or easement. Such approval
shall be made separately from the planning and permitting processes
*Minimum widths for low or medium volume accesses shall be either the minimum cross
section width of the internal subdivision street
** Minimum corner clearance shall be the distance measured from the edge of an internal
subdivision access excluding radii to the edge of an external street excluding radii.
***Minimum access spacing shall be the distance measured from the edge of an internal
subdivision access excluding radii to the edge of a neighboring access excluding radii.
47
contained in this Ordinance and shall occur prior to occupancy of any of
the housing units permitted under this Ordinance.
b. Applicants shall submit to the Board, as part of the Final Plan, detailed
construction drawings showing a plan view, profile, and typical cross-
section of the proposed streets and existing streets within three hundred
(300) feet of any proposed intersections. The plan view shall be at a scale
of one inch equals no more than fifty (50) feet. The vertical scale of the
profile shall be one (1) inch equals no more than five (5) feet. The plans
shall include the following information:
i.
Date, scale, and north point, indicating magnetic or true.
ii. Intersections of the proposed street with existing streets.
iii. Roadway and right-of-way limits including edge of pavement or aggregate
base, edge of shoulder, and clear zone.
iv. Kind, size, location, material, profile and cross-section of all existing and
proposed drainage structures and their location with respect to the existing
natural waterways and proposed drainage ways.
v.
Complete curve data shall be indicated for all horizontal and vertical curves.
vi. Turning radii at all intersections.
vii. Centerline gradients.
viii.Size, type, vertical clearance and locations of all existing and proposed
overhead and underground utilities, to include but not be limited to water,
sewer, electricity, telephone, lighting, and cable television.
c.
Plans for streets shall be sent to the consulting project engineer for review
and comment.
d. Where the applicant proposes improvements within existing public streets,
the proposed design and construction details shall be approved in writing
by the road commissioner or the Maine Department of Transportation, as
appropriate.
e.
Private Roads:
The following standards shall apply to all proposed private roads:
i.
All private roads shall be designated as such and will be required to have
adequate signage indicating the road is a private road and not publicly
maintained.
ii. Except for sidewalk, bicycle provisions and minimum grade requirements
stipulated in this Section, all private roads shall adhere to the road design
standards of this Section.
iii. The Board may approve a reduction of the right of way easement for private
roads to a minimum of thirty (30) feet in land use density areas designated as
"Rural."
48
iv. All properties served by the private road shall provide adequate access for
emergency vehicles and shall conform to the approved local street numbering
system.
v.
All private roads shall have adequate provisions for drainage and stormwater
runoff as provided in Section 10.12.
vi. The following words shall appear on the recorded plan: "All roads in this
subdivision shall remain private roads to be maintained by the developer or
the lot owners and shall not be accepted or maintained by the Town, unless
they meet all municipal street design and construction standards as verified by
a certified road construction engineer."
vii. After review by the Town Attorney, a road maintenance agreement shall be
recorded with the deed of each property to be served by a common private
road. The agreement shall provide for a method to initiate and finance a
private road and maintain that road in condition, and a method of apportioning
maintenance costs to current and future users.
2. Street Design Standards
a.
These design guidelines shall control the roadway, shoulders, clear zones,
curbs, sidewalks, drainage systems, culverts, and other appurtenances
associated with the street, and shall be met by all streets within a
subdivision, unless the applicant can provide clear and convincing
evidence that an alternate design will meet good engineering practice and
will meet the performance standards of this Article.
b. Reserve strips controlling access to streets shall be prohibited except where
their control is definitely placed with the municipality.
c.
In areas zoned and designed for commercial use, or where a change of
zoning to a zone which permits commercial uses is contemplated by the
municipality, the street right-of-way and/or pavement width shall be
increased on each side by half of the amount necessary to bring the road
into conformance with the standards for commercial streets in this
Ordinances.
d. Where a subdivision borders an existing narrow street (not meeting the
width requirements of the standards for streets in this Ordinance), or when
the Comprehensive Plan indicates plans for realignment or widening of a
road that would require use of some of the land in the subdivision, the plan
shall indicate reserved areas for widening or realigning the road marked
"Reserved for Road Realignment (Widening) Purposes." Land reserved for
such purposes may not be included in computing lot area or setback
requirements of the zoning ordinance. When such widening or realignment
is included in the municipality's capital investment plan, the reserve area
shall not be included in any lot, but shall be reserved to be deeded to the
municipality or State.
e.
The design standards of Table 10.17-3 shall be compatible with the traffic
volume access thresholds referenced in Section 10.17.A.7. In addition, the
49
street design standards shall be compatible with the estimated Average
Daily Traffic expected to occur on the internal subdivision street, and the
land use type and lot density allowed in the land use zone. The following
land use density pattern requirements shall be required for the following
land use zones.
i.
Land use density patterns that are Rural (R) shall apply to the Rural district.
ii. Land use density patterns that are Village (V) shall apply to the village
district.
iii. Land use density patterns that are Commercial (C) shall apply to the
Commercial District if the proposed development will contain commercial or
industrial uses.
f.
The Board shall have authority to increase the minimum standards in Table
10.17-3, if the Board approves a road design that will accommodate travel
speeds greater than 30 mph.
TABLE 10.17-3
*The Board may require an increase in shoulder width for stormwater management purposes or road stabilization.
**The minimum vertical clearance is the vertical clearance over the entire roadway width, including any shoulders.
*** Maximum grade may be exceeded for a length of 30'.
Table 10.17-3 Street Design Guidelines
Traffic Volume Level
1-50 ADT
50-100 ADT
Density Pattern
R
V/U
I/C
R
V/U
I/C
Minimum Right of Way
40'
40'
40'
40'
40'
50'
Minimum Traveled Way Width
14'
16'
16'
18'
18'
24'
Minimum Shoulder Width each
side*
0'
0'
4'
0'
1'
2'
Clear Zone Width (each side)
7'
7'
7'
7'
7'
7'
Minimum Vertical Clearance
14'
14'
14'
14'
14'
14'
Minimum Grade
.5%
.5%
.5%
.5%
.5%
.5%
Maximum Grade***
8%
8%
5%
8%
8%
5%
Minimum Centerline Radius****
100'
100'
350'
100'
100'
350'
Roadway Crown Asphalt Surface
25"/ft
25"/ft
25"/ft
25"/ft
25"/ft
25"/ft
Roadway Crown Aggregate
Surface
.5"/ft
N/A
N/A
.5"/ft
N/A
N/A
Minimum Internal Sight Distance
155'
155'
230'
155'
155'
230'
Minimum Internal Spacing
Standards*****
25'
25'
40'
25'
25'
40'
Minimum Internal Access to
Street Corner Clearance******
30'
30'
75'
30'
30'
75'
50
**** Super-elevation is not recommended for any subdivision street unless recommended by Road Commissioner or Town-
hired consultant.
***** Internal spacing distances are measured from the edge of one internal subdivision access to another, excluding curb
radii.
****** Internal access to street corner clearances are measured from the edge of an internal subdivision access to an
intersecting public road, excluding curb radii.
g. On Street Parking: The Board shall have authority to require a paved cross
section of 26 feet for residential subdivisions with average lot widths
between 100 feet and 40 feet wide for on-street spillover parking. The
Board may require additional shoulder lengths in any situation where the
proximity of the proposed subdivision to future or existing neighborhood
businesses, schools, community facilities, or other bicycle traffic
generators suggest that additional shoulder lengths will be needed for
bicycle traffic. In situations where additional shoulder lengths are required
for bicyclists, the minimum width of a paved shoulder shall be 1 foot on
either side of the traveled way for all low and medium volume streets in
Rural (R) designated zones. Paved shoulder widths for low and medium
volume streets in Village (V) designated zones shall be a minimum of 2
feet on either side of the traveled way.
h. The centerline of the roadway shall be the centerline of the right-of-way.
3. Street Construction Standards
a.
The minimum thickness of material after compaction shall meet the
specifications in Table 10.17-4.
TABLE 10.17-4
Table 10.17-4
Minimum Pavement Materials Thicknesses
Street Materials
Thickness Standards
Aggregate Subbase Course
(Max. sized stone 6")
Without base gravel
18"
With base gravel
15"
Crushed Aggregate Base Course
(if necessary)
3"
Hot Bituminous Pavement
Total Thickness
3"
Surface Course
1 ¼"
Base Course
1 ¾"
51
b. Preparation.
i.
Before any clearing has started on the right-of-way, the center line and side
lines of the new road shall be staked or flagged at fifty foot intervals.
ii. Before grading is started, the entire area within the right-of-way necessary for
traveled way, shoulders, clear zones, sidewalks, drainage-ways, and utilities
shall be cleared of all stumps, roots, brush, and other objectionable material.
All shallow ledge, large boulders and tree stumps shall be removed from the
cleared area. All organic materials or other deleterious material shall be
removed to a depth of two feet below the subgrade of the roadway. Rocks and
boulders shall also be removed to a depth of two feet below the subgrade of
the roadway. On soils which have been identified by the municipal engineer
as not suitable for roadways, either the subsoil shall be removed from the
street site to a depth of two feet below the subgrade and replaced with material
meeting the specifications for gravel aggregate sub-base below, or a Maine
Department of Transportation approved stabilization geotextile may be used.
iii. Except in a ledge cut, side slopes shall be no steeper than a slope of three feet
horizontal to one foot vertical, and shall be graded, loamed, limed, fertilized,
and seeded according to the specifications of the erosion and sedimentation
control plan. Where a cut results in exposed ledge a side slope no steeper than
one foot horizontal to four feet vertical is permitted.
iv. All underground utilities shall be installed prior to paving to avoid cuts in the
pavement. Building sewers and water service connections shall be installed to
the edge of the right-of-way prior to paving.
c.
Bases and Pavement.
i.
Bases/Subbase
(i) The Aggregate subbase course shall be sand or gravel of hard durable
particles free from vegetative matter, lumps or balls of clay and other
deleterious substances. The gradation of the part that passes a three inch
square mesh sieve shall meet the grading requirements of Table 10.17-5.
Surface Gravel
(if permissible)
3"
52
Table 10.17-5
Aggregate for the subbase shall contain no particles of rock exceeding six inches in any dimension.
(ii) If the Aggregate Subbase Course is found to be not fine-gradable because
of larger stones, then a minimum of three inches of Aggregate Base
Course shall be placed on top of the subbase course. The Aggregate Base
Course shall be screened or crushed gravel of hard durable particles free
from vegetative matter, lumps or balls of clay and other deleterious
substances. The gradation of the part that passes a three inch square mesh
sieve shall meet the grading requirements of Table 10.17-6.
Table 10.17-6
(iii) Aggregate for the base shall contain no particles of rock exceeding two
inches in any dimension.
Table 10.17-5
Aggregate Subbase Grading Requirements
Sieve Designation Sieves
Percentage by
Weight Passing
Square Mesh
¼ inch
25-70%
No. 40
0-30%
No. 200
0-7%
Table 10.17-6
Base Course Grading Requirements
Sieve Designation Sieves
Percentage by
Weight Passing
Square Mesh
½ inch
45-70%
¼"
30-55%
No.40
0-20%
No. 200
0-5%
53
ii. Pavement Joints: Where pavement joins an existing pavement, the existing
pavement shall be cut along a smooth line and form a neat, even, vertical
joint.
iii. Pavements
(i) Minimum standards for the base layer of pavement shall be the Maine
Department of Transportation specifications for plant mix grade B with an
aggregate size no more than 1 inch maximum and a liquid asphalt content
between 4.8% and 6.0% by weight depending on aggregate characteristics.
The pavement may be placed between April 15 and November 15,
provided the air temperature in the shade at the paving location is 35°F or
higher and the surface to be paved is not frozen or unreasonably wet.
(ii) Minimum standards for the surface layer of pavement shall be the Maine
Department of Transportation specifications for plant mix grade C or D
with an aggregate size no more than 3/4 inch maximum and a liquid
asphalt content between 5.8% and 7.0% by weight depending on aggregate
characteristics. The pavement may be placed between April 15 and
October 15, provided the air temperature in the shade at the paving
location is 50°F or higher.
iv. Surface Gravel: The Board may approve an aggregate road base for any
internal subdivision public street in which zoning requires a minimum of one
dwelling unit per 7 acres, or any private way with a maximum estimated
Average Daily Traffic of 50 ADT or less. The surface gravel shall meet the
gravel grading requirements of Table 10.17-7.
Table 10.17-7
Table 10.17-7
Surface Gravel Grading Requirements
Sieve Designation Sieves
Percentage by
Weight Passing
Square Mesh
2 inch
95-100%
½ inch
30-65%
No. 200
7-12%
54
ARTICLE 11 - PERFORMANCE GUARANTEES
11.1 Types of Guarantees.
With submittal of the application for Final Plan approval, the applicant shall provide one of the
following performance guarantees for an amount adequate to cover the total construction costs of
all required improvements, taking into account the time-span of the construction schedule and
the inflation rate for construction costs:
A. Either a certified check payable to the municipality or a savings account or certificate of
deposit naming the municipality as owner, for the establishment of an escrow account;
B. A performance bond payable to the municipality issued by a surety company, approved by
the municipal officers, or town administrator; or
C. An irrevocable letter of credit from a financial institution establishing funding for the
construction of the subdivision, from which the Municipality may draw if construction is
inadequate, approved by the municipal officers, or town administrator.
The conditions and amount of the performance guarantee shall be determined by the Board with
the advice of the municipal engineer, road commissioner, municipal officers, and/or municipal
attorney.
11.2 Contents of Guarantee.
The performance guarantee shall contain a construction schedule, cost estimates for each major
phase of construction taking into account inflation, provisions for inspections of each phase of
construction, provisions for the release of part or all of the performance guarantee to the
developer, and a date after which the applicant will be in default and the municipality shall have
access to the funds to finish construction.
11.3 Escrow Account.
A cash contribution to the establishment of an escrow account shall be made by either a certified
check made out to the municipality, the direct deposit into a savings account, or the purchase of a
certificate of deposit. For any account opened by the applicant, the municipality shall be named
as owner or co-owner, and the consent of the municipality shall be required for a withdrawal.
Any interest earned on the escrow account shall be returned to the applicant unless the
municipality has found it necessary to draw on the account, in which case the interest earned
shall be proportionately divided between the amount returned to the applicant and the amount
withdrawn to complete the required improvements.
11.4 Performance Bond.
A performance bond shall detail the conditions of the bond, the method for release of the bond or
portions of the bond to the applicant, and the procedures for collection by the municipality. The
bond documents shall specifically reference the subdivision for which approval is sought.
11.5 Letter of Credit.
An irrevocable letter of credit from a bank or other lending institution with offices in the region,
shall indicate that funds have been set aside for the construction of the subdivision for the
duration of the project and may not be used for any other project or loan.
55
11.6 Phasing of Development.
The Board may approve plans to develop a major subdivision in separate and distinct phases.
This may be accomplished by limiting final approval to those lots abutting that section of the
proposed subdivision street which is covered by a performance guarantee. When development is
phased, road construction shall commence from an existing public way and shall abide by the
guidelines set for road construction in section 10.17-3. Final approval of lots in subsequent
phases shall be given only upon satisfactory completion of all requirements pertaining to
previous phases.
11.7 Release of Guarantee.
Prior to the release of any part of the performance guarantee, the Board shall determine to its
satisfaction, in part upon the report of the municipal engineer or other qualified individual
retained by the municipality and any other agencies and departments who may be involved, that
the proposed improvements meet or exceed the design and construction requirements for that
portion or phase of the subdivision for which the release is requested.
11.8 Default.
If upon inspection, the municipal engineer or other qualified individual retained by the
municipality finds that any of the required improvements have not been constructed in
accordance with the plans and specifications filed as part of the application, he or she shall so
report in writing to the code enforcement officer, the municipal officers, the Board, and the
applicant or builder. The municipal officers shall take any steps necessary to preserve the
municipality's rights.
11.9 Improvements Guaranteed.
Performance guarantees shall be tendered for all improvements required to meet the standards of
this Ordinance and for the construction of the streets, stormwater management facilities, public
sewage collection or disposal facilities, public water systems, and erosion and sedimentation
control measures.
11.10 Year-round Housing Units.
Subdivision proposals intended to create Year-round Housing Units, as defined, are exempt from
Performance Guarantee requirements under this Article, except that documentation of the
applicant's financial capacity to construct the project must be provided and found to be
acceptable to the Planning Board.
56
ARTICLE 12 - WAIVERS
12.1 Waivers of Certain Procedures Authorized.
Where the Board makes written findings of fact that there are special circumstances of a
particular parcel proposed to be subdivided, and/or that the proposed subdivision is intended to
create Year-round Housing Units, it may waive portions of the submission requirements and
related procedures, unless prohibited by local ordinances or Maine statutes, provided that the
waivers do not have the effect of nullifying the intent and purpose of the comprehensive plan, the
zoning ordinance, or local ordinances.
The Board may allow an applicant to combine the final plan and preliminary plan application
steps into one procedure, upon making all of the following written findings of fact:
A. No new streets are proposed;
B. No approvals are required from the Maine Department of Environmental Protection under the
Site Location of Development Act, Stormwater Law, or Natural Resources Protection Act,
other than a "Permit by Rule;"
C. The Board agrees to approve a waiver from the requirement to submit a stormwater
management plan, sedimentation and erosion control plan, and Traffic Impact Analysis as
ordinarily required by Articles 6 or 7 of this Ordinance; and
D. The application contains all other applicable submissions required for both the preliminary
and final plan steps, except for those items for which a waiver of a required submission has
been requested and granted.
12.2 Waivers of Certain Improvements and Standards Authorized.
Where the Board makes written findings of fact that due to special circumstances of a particular
lot proposed to be subdivided, and/or that the proposed subdivision is intended to create of Year-
round Housing Unit, it may waive certain improvements and performance standards that are
otherwise required by local ordinances but are found to be unnecessary to provide for public
health, safety or welfare, or are found to be inappropriate because of inadequate or lacking
connecting facilities adjacent to or in proximity of the proposed subdivision, provided the
waivers do not have the effect of nullifying the intent and purpose of the comprehensive plan.
12.3 Conditions for Waivers.
When granting waivers, the Board shall set conditions of approval so that the purposes of
applicable local ordinances and Maine statutes are met.
12.4 Waivers To Be Shown On Final Plan.
When the Board grants a waiver to any of the improvements required by local ordinances, the
Final Plan, to be recorded at the Registry of Deeds, shall indicate the waivers granted and the
date on which they were granted.
57
ARTICLE 13 - APPEALS
13.1 Administrative Appeals.
The Board of Appeals shall hear and decide appeals where it is alleged that there is any error in
any order, requirement, decision, or determination made by, or failure to act by, the Code
Enforcement officer or the Planning Board in the administration of this Ordinance. When errors
of administrative procedures or interpretation are found, the case shall be remanded to the Code
Enforcement Officer or Planning Board for correction.
13.2 Variances.
The Board of Appeals shall authorize variances upon appeal, within the limitations set forth in
this Ordinance.
A. Variances shall not be granted for establishment of any use otherwise prohibited by this
Ordinance or by any other North Haven ordinance.
B. The Board of Appeals shall not grant a variance unless it finds that:
1. The proposed structure or use would meet the performance standards of this
Ordinance except for the specific provision which has created the non-
conformity and from which relief is sought; and
2. The strict application of the terms of this Ordinance would result in an undue
hardship. The term "undue hardship" shall mean all of the following:
a.
The land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the circumstances of the property and
not to the general conditions in the neighborhood;
c.
That the granting of a variance will not alter the essential character of the
locality; and
d. That the hardship is not the result of action taken by the applicant or a prior
owner.
C. The Board of Appeals may grant a variance to a property owner for the purpose of making
that property accessible to a person with a disability who is living or regularly visits the
property. The Board of Appeals shall restrict any variance granted under this Subsection
solely to the installation of equipment or the construction of structures necessary for access to
or egress from the property by the person with the disability.
D. The Board of Appeals may grant a variance to a property owner from a setback requirement
only when strict application of this Ordinance to the petitioner and the petitioner's property
would cause undue hardship. A variance under this section may not exceed 20% of setback
requirement and may not be granted if the variance would cause the area of the dwelling to
exceed the maximum permissible lot coverage (if applicable). If the petitioner has obtained
the written consent of an affected abutting landowner, the 20% limitation may be extended.
The term "undue hardship" for this section means:
58
1. The need for a variance is due to the unique circumstances of the property and
not to general conditions in the neighborhood;
2. The granting of a variance will not alter the essential character of the locality;
3. The hardship is not the result of action taken by the applicant or a prior owner;
4. The granting of the variance will not substantially reduce or impair the use of
abutting property; and
5. The granting of a variance is based upon demonstrated need, not convenience,
and no other feasible alternative is available.
13.3 Appeal to Superior Court.
An appeal may be taken within thirty (30) days after any decision is rendered by the Board of
Appeals, by any party to Superior Court in accordance with State Law.
13.4 Variances Recorded.
If the Board of Appeals grants a variance under this Ordinance, the final plan, to be recorded at the
Registry of Deeds, shall indicate the variance(s) granted and the date on which they were granted. A
variance is not valid until recorded as provided in this Ordinance. The date of the final written
approval shall be the date stated on the written approval.
59