TOWN OF
NORTH YARMOUTH
LAND USE ORDINANCE
Adopted: June 14, 2005
Amended: May 13, 2006
May 17, 2008
May 30, 2009
June 12, 2010
June 18, 2011
June 16, 2012
June 15, 2013
April 9, 2016
April 28, 2018
October 30, 2018
June 19, 2021
March 15, 2022
April 30, 2022
November 8, 2022
June 17, 2023
June 17, 2024
June 15, 2026
Town of North Yarmouth Land Use Ordinance
Page 2 of 292
TABLE OF CONTENTS
I. GENERAL PROVISIONS......................................................................................................................... 5
SECTION 1.1 TITLE ................................................................................................................................... 5
SECTION 1.2
AUTHORITY ....................................................................................................................... 5
SECTION 1.3
PURPOSE [amended 6/19/21] ............................................................................................ 5
SECTION 1.4
CONFLICT WITH OTHER ORDINANCES .......................................................................... 6
SECTION 1.5
SEPARABILITY .................................................................................................................. 6
SECTION 1.6 EFFECTIVE DATE OF THIS ORDINANCE AND REPEAL OF FORMERLY ADOPTED
ORDINANCES AND REGULATIONS [Amended 5/17/08] ............................................................................ 6
SECTION 1.7
AMENDMENTS TO THIS ORDINANCE .............................................................................. 7
SECTION 1.8 CONTRACT ZONING [amended 6/19/21] ............................................................................. 7
II.
NON- ARTICLE CONFORMANCE ..................................................................................................... 10
SECTION 2.1 INTENT [Amended 5/17/08] ................................................................................................ 10
SECTION 2.2 GENERAL ........................................................................................................................... 10
SECTION 2.3 NON-CONFORMING STRUCTURES [Amended 5/17/08] ................................................... 10
SECTION 2.4 NON-CONFORMING USES [Amended 5/17/08] ................................................................. 12
SECTION 2.5 NON-CONFORMING LOTS [Amended 5/17/08] .................................................................. 13
SECTION 2.6 VESTED RIGHTS ................................................................................................................ 14
lII. ADMINISTRATION AND ENFORCEMENT .......................................................................................... 15
SECTION 3.1 CODE ENFORCEMENT OFFICER (CEO) [Amended 5/17/08] ............................................ 15
SECTION 3.2 APPROVALS AND PERMITS REQUIRED [Amended 5/17/08, 6/19/21] .............................. 15
SECTION 3.3 BUILDING/LAND USE PERMITS [Amended 5/17/08; 6/19/21; 3/15/22; 6/17/24]................. 16
SECTION 3.4 EXPIRATION OF PERMITS [Amended 5/17/08] .................................................................. 19
SECTION 3.5 TRANSFER OF PERMITS ................................................................................................... 19
SECTION 3.6 CERTIFICATE OF OCCUPANCY ........................................................................................ 19
SECTION 3.7 FEES [amended 6/19/21] ..................................................................................................... 19
SECTION 3.8 PERFORMANCE GUARANTEES [AMENDED 6/17/24] ...................................................... 20
SECTION 3.9 CONFORMANCE WITH OTHER LAWS, REGULATIONS [amended 6/19/21]..................... 21
SECTION 3.10 LEGAL ACTION AND VIOLATIONS [Amended 5/17/08; 6/19/21] ...................................... 22
IV.
SITE PLAN REVIEW AND CONDITIONAL USE PROCEDURES ................................................... 23
SECTION 4.1 PURPOSE ........................................................................................................................... 23
SECTION 4.2 APPLICABILITY ................................................................................................................... 23
SECTION 4.3 REVIEW AND APPROVAL AUTHORITY [amended 6/19/21; 6/17/24] ................................. 23
SECTION 4.4 PROCEDURES [amended 6/19/21; 4/30/22; 6/17/24] .......................................................... 24
SECTION 4.5 GROUNDWATER PROTECTION OVERLAY DISTRICT: ADDITIONAL SUBMISSION
REQUIREMENTS ...................................................................................................................................... 33
Section 4.6 royal river OVERLAY DISTRICT: ADDITIONAL SUBMISSION REQUIREMENTS .................. 37
SECTION 4.7 CONDITIONAL USES .......................................................................................................... 38
V.
SUBDIVISION REVIEW PROCEDURES AND CRITERIA ................................................................. 40
SECTION 5.1 PURPOSES ......................................................................................................................... 40
SECTION 5.2 AUTHORITY AND ADMINISTRATION [AMENDed 6/17/24] ................................................ 40
SECTION 5.3 PRE-APPLICATION MEETING, SKETCH PLAN AND SITE visit [amended 6/19/21; 6/17/24]
................................................................................................................................................................... 41
SECTION 5.4 SPECIAL SUBMISSION REQUIREMENTS ......................................................................... 42
SECTION 5.5 MINOR SUBDIVISION [amended 6/19/21; 4/30/22; 6/17/24] ............................................... 42
SECTION 5.6 PRELIMINARY PLAN FOR MAJOR SUBDIVISION [amended 6/19/21; 4/30/22; 6/17/24] ... 48
SECTION 5.7 FINAL PLAN FOR MAJOR SUBDIVISION [amended 6/19/21;4/30/22; 6/17/24] .................. 54
SECTION 5.8 FINAL APPROVAL AND FILING FOR MINOR AND MAJOR SUBDIVISIONS [amended
6/19/21; 6/17/24] ........................................................................................................................................ 57
Town of North Yarmouth Land Use Ordinance
Page 3 of 292
SECTION 5.9 REVISIONS TO APPROVED PLANS FOR MINOR AND MAJOR SUBDIVISIONS [Revised
4/30/22; 6/17/24] ........................................................................................................................................ 58
SECTION 5.10 INSPECTIONS AND ENFORCEMENT [amended 6/19/21] ................................................ 58
SECTION 5.11 SUBDIVISION REVIEW CRITERIA [amended 6/17/24] ..................................................... 60
VI.
VARIANCES AND APPEALS ......................................................................................................... 64
SECTION 6.1 APPOINTMENT AND COMPOSITION [amended 6/19/21] .................................................. 64
SECTION 6.2 POWERS AND DUTIES OF THE ZONING BOARD OF APPEALS (ZBA). [Amended
5/17/08] ...................................................................................................................................................... 64
SECTION 6.3 ADMINISTRATIVE APPEALS, VARIANCES AND MISCELLANEOUS APPEALS
[Amended 6/12/10; 6/19/21, 11/08/22] ....................................................................................................... 64
VII.
ZONING DISTRICT REGULATIONS .............................................................................................. 69
SECTION 7.1
ESTABLISHMENT OF DISTRICTS................................................................................... 69
SECTION 7.2
ZONING MAP AND LOCATIONS OF DISTRICTS ............................................................ 69
SECTION 7.3 DISTRICT PURPOSES [Amended 5/17/08] ......................................................................... 71
SECTION 7.4 DISTRICT LAND USE TABLE [amended 6/19/21] ............................................................... 73
TABLE 7-1 LAND USES BY DISTRICT KEY ............................................................................................. 74
SECTION 7.5 SPECIAL EXCEPTION FOR SINGLE FAMILY DWELLINGS AND ACCESSORY
STRUCTURES IN THE RESOURCE PROTECTION DISTRICT [Amended 5/17/08; 6/17/24] ................... 84
SECTION 7.6 SPACE AND DIMENSIONAL REQUIREMENTS [Amended 5/17/08; 6/19/21; 6/17/24] ....... 85
TABLE 7.2 SPACE AND DIMENSIONAL REQUIREMENTS [AMENDED 6/19/21, 11/08/22; 6/17/24] ...... 88
VIII.
GENERAL REQUIREMENTS: APPLICABLE TO ALL LAND USES .............................................. 93
SECTION 8.1 PURPOSE AND APPLICABILITY ........................................................................................ 93
SECTION 8.2 UTILIZATION OF THE SITE ................................................................................................ 93
SECTION 8.3 BACK LOTS AND STREET ACCESS REQUIREMENTS [Amended 6/19/21; 6/17/24] ........ 93
SECTION 8.4 DESIGN AND CONSTRUCTION STANDARDS FOR ROADS AND DRIVEWAYS
[AMENDED 6/19/21] .................................................................................................................................. 94
Table 8.2.................................................................................................................................................. 102
SECTION 8.5 EROSION AND SEDIMENTATION CONTROL .................................................................. 105
SECTION 8.6 SEWAGE DISPOSAL ........................................................................................................ 106
SECTION 8.7 SIGNS [Amended 5/17/08; 6/17/24] ................................................................................... 106
SECTION 8.8 STORM WATER CONTROL .............................................................................................. 108
SECTION 8.9 WATER QUALITY [amended 6/17/24] ............................................................................... 108
SECTION 8.10 WELLS ............................................................................................................................ 109
SECTION 8.11 ANIMAL HUSBANDRY .................................................................................................... 109
SECTION 8.12 FLOODPLAIN MANAGEMENT [amended 6/17/24] ......................................................... 109
IX.
SPECIAL DISTRICT STANDARDS .............................................................................................. 111
SECTION 9.1 RESIDENTIAL SHORELAND DISTRICT AND RESOURCE PROTECTION DISTRICT
PERFORMANCE STANDARDS [Amended 5/17/08;6/19/21] ................................................................... 111
SECTION 9.2 GROUNDWATER PROTECTION OVERLAY DISTRICT: BEST MANAGEMENT
PRACTICES [amended 6/17/24] .............................................................................................................. 123
SECTION 9.3 ROYAL RIVER CORRIDOR OVERLAY DISTRICT [amended 6/19/21] ............................. 129
X.
PERFORMANCE AND DESIGN STANDARDS FOR SITE PLAN REVIEW AND SUBDIVISION
REVIEW ................................................................................................................................................... 131
SECTION 10.1 APPLICABILITY ............................................................................................................... 131
SECTION 10.2 GENERAL LAYOUT OF DEVELOPMENT [amended 6/19/21] ......................................... 131
SECTION 10.3. BROOK, POND, VERNAL POOL AND WETLAND BUFFERS ........................................ 132
SECTION 10.4 BUILDING STANDARDS [amended 6/19/21] ................................................................... 135
SECTION 10.5 COMMUNITY FACILITIES IMPACT ANALYSIS AND MITIGATION ................................. 223
SECTION 10.6 DRIVE THROUGH FACILITES [amended 6/19/21] ......................................................... 223
SECTION 10.7 EROSION AND SEDIMENTATION CONTROL ................................................................ 223
Town of North Yarmouth Land Use Ordinance
Page 4 of 292
SECTION 10.8 EMISSIONS ..................................................................................................................... 224
SECTION 10.9 EXTERIOR LIGHTING .................................................................................................... 224
SECTION 10.10 FINANCIAL AND TECHNICAL CAPACITY ................................................................... 225
SECTION 10.11 FLOODPLAIN MANAGEMENT [amended 6/17/24] ....................................................... 225
SECTION 10.12 HAZARDOUS, SPECIAL, AND RADIOACTIVE MATERIALS [amended 6/17/24] .......... 226
SECTION 10.13 HISTORIC AND ARCHAEOLOGICAL SITES ................................................................ 226
SECTION 10.14 LANDSCAPING, BUFFERS AND SCREENING............................................................. 226
SECTION 10.15 NATURAL BEAUTY AND AESTHETICS IN THE FARM AND FOREST DISTRICT,
RESIDENTIAL SHORELAND DISTRICT AND RESOURCE PROTECTION DISTRICT ........................... 227
SECTION 10.16 NOISE ........................................................................................................................... 228
SECTION 10.17 SEWAGE DISPOSAL [amended 4/30/22] ...................................................................... 228
SECTION 10.18 SIGNS [amended 6/17/24] ............................................................................................. 229
SECTION 10.19 SOIL SUITABILITY ........................................................................................................ 229
SECTION 10.20 SOLID WASTE DISPOSAL ............................................................................................ 229
SECTION 10.21 STORAGE OF MATERIALS .......................................................................................... 230
SECTION 10.22 STORM WATER CONTROL .......................................................................................... 230
SECTION 10.23 RECREATION AND OPEN SPACE LAND [amended 6/19/21; 4/30/22; 6/17/24] ........... 231
SECTION 10.24 WATER SUPPLY [amended 6/17/24] ............................................................................ 234
SECTION 10.25 WATER QUALITY [amended 6/19/21] ........................................................................... 235
SECTION 10.26 PROTECTION OF SIGNIFICANT WILDLIFE HABITAT [AMENDED 6/19/21] ................ 236
SECTION 10.27 PUBLIC ACCESS TO THE SHORELINE ....................................................................... 237
SECTION 10.28 BACK LOTS AND ACCESS [amended 6/19/21; 6/17/24] ............................................... 237
SECTION 10.29 ACCESS MANAGEMENT STANDARDS [amended 6/19/21] ......................................... 237
SECTION 10.30 SUBDIVISION STREET CONNECTIVITY REQUIRED IN THE VILLAGE CENTER AND
VILLAGE RESIDENTIAL DISTRICTS [amended 6/19/21] ........................................................................ 240
SECTION 10.31 SUBDIVISION STREET LENGTH AND CONNECTION REQUIREMENTS IN THE FARM
AND FOREST DISTRICT AND RESIDENTIAL SHORELAND DISTRICT [amended 6/19/21] .................. 241
SECTION 10.32 PEDESTRIAN WAYS AND BICYCLE ACCESS, CIRCULATION AND FACILITIES
[amended 6/19/21] ................................................................................................................................... 242
SECTION 10.33 INTERNAL VEHICULAR CIRCULATION [amended 6/19/21] ......................................... 243
SECTION 10.34 OFF STREET PARKING [amended 6/19/21; 6/17/24] ................................................... 243
SECTION 10.35 OFF STREET LOADING REQUIREMENTS .................................................................. 246
XI.
STANDARDS FOR SPECIFIC ACTIVITIES .................................................................................. 248
SECTION 11.1 ACCESSORY dwelling apartments [Amended 5/17/08; 6/17/24] ..................................... 248
SECTION 11.2 AFFORDABLE HOUSING [amended 6/19/21; 6/17/24] ................................................... 249
11.2.1
Village Center (VC) District Affordable Housing Density Bonus ................................................. 249
11.2.2 - Affordable Housing Bonus for districts outside the Village Center ............................................... 251
SECTION 11.3 CLUSTERED HOUSING DEVELOPMENT AND OPEN SPACE DEVELOPMENT [amended
6/19/21] .................................................................................................................................................... 252
SECTION 11.4 HOME OCCUPATIONS ................................................................................................... 259
SECTION 11.5 MANUFACTURED HOUSING ON INDIVIDUAL LOTS .................................................... 260
SECTION 11.6 MOBILE HOME PARKS [AMENDED 6/19/21] ................................................................. 260
SECTION 11.7 EXTRACTION OF EARTH MATERIALS (MINERAL EXTRACTION) [amended 6/19/21] . 265
SECTION 11.8 WIRELESS COMMUNICATIONS FACILITIES [amended 6/19/21] .................................. 267
SECTION 11.9 [reserved] ......................................................................................................................... 272
sECTION 11.11 ADVANCED WASTEWATER TREATMENT SYSTEMS (WHERE REQUIRED) ............. 272
XII.
DEFINITIONS [AMENDED 6/19/21;4/30/22; 06/17/23; 6/17/24] ................................................... 274
Town of North Yarmouth Land Use Ordinance
Page 5 of 292
I. GENERAL PROVISIONS
SECTION 1.1 TITLE
This Ordinance shall be known as the "Town of North Yarmouth Land Use Ordinance", and may be
referred to by said designation. No building or structure shall be erected, structurally altered, enlarged,
repaired, moved, rebuilt, or used, and no land shall be used, except in conformity with the provisions of
this Ordinance.
SECTION 1.2 AUTHORITY
This Ordinance is adopted pursuant to the enabling provisions of the Maine Constitution; the provisions
of 30-A, M.R.S. Section 3001 (Home Rule); the State's Comprehensive Planning and Land Use
Regulation Act, 30-A M.R.S. § 4301, et seq.; the Mandatory Shoreland Zoning Act, 38 M.R.S. Sections
435 et. seq.; and the Subdivision Law, 30-A, M.R.S. § 4401, et. seq.
SECTION 1.3 PURPOSE [AMENDED 6/19/21]
This Ordinance is adopted for the following purposes:
A. To implement the provisions of the town's duly adopted Comprehensive Plan, as amended from
time to time.
B. To provide for the health, safety and general welfare of its inhabitants
C. To encourage orderly growth and development in appropriate areas of the community, while
protecting rural character, and making efficient use of public services
D. To encourage the most appropriate use of land throughout the town
E. To promote traffic safety
F. To provide adequate light and air, and safety from fire and other elements
G. To promote coordinated development of unbuilt areas
H. To encourage the formation of community units
I.
To provide an allotment of land area for new developments sufficient for all the requirements
of community life
J. To conserve and protect natural resources, including wildlife habitat, scenic and cultural resources
K. To provide for adequate and cost-effective public services
L. To control building sites, placement of structures and land uses
M. To conserve natural beauty and open space
N. In shoreland areas:
1. To further the maintenance of safe and healthful conditions
Town of North Yarmouth Land Use Ordinance
Page 6 of 292
2. To prevent and control water pollution
3. To protect fish spawning grounds, aquatic life, bird and other wildlife habitat
4. To protect buildings and lands from flooding and accelerated erosion
5. To protect freshwater wetlands
6. To conserve shore cover, and visual as well as actual points of access to inland waters
7. To anticipate and respond to the impacts of development in shoreland areas
SECTION 1.4 CONFLICT WITH OTHER ORDINANCES
Whenever the requirements of this Ordinance are at variance with the requirements of any other lawfully
adopted rules, regulations, ordinances, deed restrictions or covenants, the most restrictive, or that
imposing the higher standards, shall govern.
SECTION 1.5 SEPARABILITY
In the event any section, subsection or any portion of this Ordinance shall be declared by any court of
competent jurisdiction to be invalid for any reason, such section shall not be deemed to affect the validity
of any other section, subsection or other portion of this Ordinance. To this end, the provisions of this
Ordinance are hereby declared to be separable.
SECTION 1.6 EFFECTIVE DATE OF THIS ORDINANCE AND REPEAL OF FORMERLY ADOPTED
ORDINANCES AND REGULATIONS [AMENDED 5/17/08]
A. Effective Date of Ordinance and Ordinance Amendments: This Ordinance became effective on
its date of enactment, June 14, 2005. Notwithstanding Section 1.6.B below, any amendments to this
Ordinance take effect upon enactment by the Town of North Yarmouth.
B. Shoreland Zoning Provisions1: The shoreland zoning provisions of this Ordinance shall be
effective upon the date of adoption subject to Commissioner of the Department of Environmental
Protection approval. A certified copy of the Ordinance, or Ordinance Amendment, attested and
signed by the Town Clerk, shall be forwarded to the Commissioner of the Department of
Environmental Protection for approval. If the Commissioner fails to act on the shoreland zoning
provisions, or shoreland zoning amendment, of this Ordinance within 45 days of his/her receipt of
the Ordinance, it shall be automatically approved.
C. Repeal and Replacement of Prior Ordinances and Regulations: Adoption of this Ordinance
repeals and replaces the previously adopted Zoning Ordinance, Shoreland Zoning Ordinance and
the Subdivision Regulations for the town of North Yarmouth adopted by the Planning Board.
D. Repeal of Municipal Timber Harvesting Regulation [Adopted 5/17/08]: The municipal regulation
of timber harvesting activities is repealed on the statutory date established under 38 M.R.S. Section
438-A(5), at which time the State of Maine Department of Conservation's Bureau of Forestry shall
administer timber harvesting standards in the Residential Shoreland District and Resource
Protection District. On the date established under 38 M.R.S. Section 438-A(5), the following
provisions of this Ordinance are repealed:
1 Shoreland zoning provisions include those provisions associated with the Resource Protection District and the Residential Shoreland District.
Town of North Yarmouth Land Use Ordinance
Page 7 of 292
1. In Section VII. Table 7-1. Table of Land Uses, Column 1, "Forest management activities except
for timber harvesting" and "Timber harvesting";
2. Section IX. Section 9-1.S. Timber Harvesting, in its entirety; and
3. Section XII. Definitions, the following definitions: "forest management activities" and "residual
basal area".
SECTION 1.7 AMENDMENTS TO THIS ORDINANCE
A. General: This Ordinance may be amended by a majority vote of the registered voters in attendance
at a regular town meeting or special town meeting called by the Municipal Officers. The Ordinance
may also be amended at a regular town meeting upon a written petition of at least 10 percent of the
town's registered voters. In all cases a public hearing shall be held prior to the town meeting vote
on the proposed amendment.
B. Shoreland Zoning Amendments1: Copies of amendments relative to the shoreland zones,
attested and signed by the Town Clerk, shall be submitted to the Commissioner of the Department
of Environmental Protection following adoption by the town and shall not be effective unless
approved by the Commissioner. If the Commissioner fails to act on any amendment within 45 days
of his/her receipt of the amendment, the amendment is automatically approved. Any application for
a permit in the shoreland, submitted to the town within the 45-day period shall be governed by the
terms of the amendment if the Commissioner approves such amendment.
SECTION 1.8 CONTRACT ZONING [AMENDED 6/19/21]
A. Authorization:
Pursuant to 30-A M.R.S. § 4352(8), contract zoning is hereby authorized for rezoning of property
where, for reasons such as the unusual nature or unique location of the development proposed, the
Select Board finds it necessary or appropriate to modify the zoning district regulations applicable to
a parcel of land, which will allow reasonable uses of the land and activities which would not have been
permitted by the existing zoning district regulations but which remain consistent with the Town of
North Yarmouth's Comprehensive Plan and compatible with the existing and permitted uses within
the existing zoning district classification. Nothing in this section shall authorize a rezoning, or an
agreement to change or retain a zone, which is inconsistent with the Town's Comprehensive Plan.
Considering a request for a contract zone agreement for a particular property or group of properties
under this section, the Select Board may impose certain conditions and restrictions
on the use of the property where it finds:
a. that such conditions and restrictions are necessary to protect the public health, safety, and
general welfare;
b. when the Select Board seek to advance desired land use objectives consistent with the
Comprehensive Plan;
c. where such uses provide a public purpose or benefit.
Town of North Yarmouth Land Use Ordinance
Page 8 of 292
B. Standards:
1. Any zone change adopted pursuant to this section shall be subject to a contractual agreement
executed by authorized representatives of both the property owner and the Town of North
Yarmouth providing for the implementation and enforcement of the conditions and restrictions of
the agreement.
2. The agreement shall only include conditions or restrictions which relate to the physical
development or operation of the property.
3. Any zone change permitted under this section shall be consistent with the Comprehensive
Plan of the Town and with the existing and permitted uses in the original zone.
4. The proposed contract zoning agreement shall clearly describe the extent of variation (if
any) from the standards for the zone in which the parcel is located, and may include site plan
drawings and all other pertinent information to support the contract.
C. Conditions and Restrictions:
Conditions and restrictions imposed by the Select Board under the authority of this section
shall relate only to the physical development and operation of the property and may include, but
shall not be limited to, the following:
1. Limitation of the number and type of permitted uses of the property.
2. Restriction on the scale and density of development.
3. Specifications for the design and layout of the building(s), accessory buildings and other site
improvements.
4. Contributions toward the provision of municipal services required by or a result of the
development
5. The lot standards.
6. The hours of operation for the proposed use.
7. The creation or preservation of open space areas or buffer zones, protection of natural areas
and historic features.
8. The dedication of property, undeveloped or improved, for public purposes, such as streets,
sidewalks and trails, parks, utility systems, and conservation easements.
9. Schedules for commencement and completion of construction.
10. Provisions for enforcement and remedies for breach of any condition restrictions.
11. Performance guarantees securing completion and maintenance of improvements, and
guarantees against defects.
Town of North Yarmouth Land Use Ordinance
Page 9 of 292
D. Notice Requirements and Procedures:
1. The Select Board shall hear the request for a contract zoning proposal in a public meeting,
and will decide whether to continue consideration of the proposal by referring the matter to
the Planning Board for an advisory recommendation.
2. In accordance with 30-A M.R.S. §4352(8), the Planning Board shall hold a public hearing. Notice
of this hearing shall be posted in the town office at least thirteen (13) days prior to the public
hearing and shall be published in a newspaper of general circulation within the town at least two
(2) times, the date of the first publication must be at least twelve (12) days prior to the hearing
and the second notice at least seven (7) days prior to the hearing. Notice shall also be sent to
the property owner and all abutters within a five-hundred foot (500 ft.) radius of the boundary
lines of the property being considered for contract zoning at their last-known address. This
notice shall contain a copy of the proposed conditions and restrictions, with a map indicating
the property to be rezoned.
3. After holding a public hearing, the Planning Board shall make a recommendation to the Select
Board on the proposal and its conformance with the Town's Comprehensive Plan and land use
goals. This recommendation is advisory in nature; the Select Board may act independently of
the recommendation of the Planning Board.
4. The Select Board shall hold a public hearing and, following any testimony, approve, modify or
deny the contract zoning request. If the Select Board modifies the proposal by doing any one or
more of the following, the proposal will need to be referred back to the Planning Board for a
public hearing and subsequent recommendation to the Select Board:
a. Adds to the list of permitted uses or activities for hours of operation;
b. Substantially modifies restrictions on the scale and density of development;
c. Substantially modifies specifications for the design and layout of building(s), accessory
buildings and other site improvements;
d. Eliminates or makes less restrictive performance standards;
e. Makes any other change or changes which substantially modify the proposed agreement
that was presented to the Planning Board.
5. The term of the contract zoning agreement shall be set forth in the contract agreement. Any
violation of the contract zoning agreement shall be considered a violation of this chapter and
shall be subject to enforcement under the provisions of 30-A M.R.S. § 4452. The contract
zoning agreement may include additional provision(s) concerning enforcement of specific
provisions of the agreement.
Town of North Yarmouth Land Use Ordinance
Page 10 of 292
II.
NON- ARTICLE CONFORMANCE
SECTION 2.1 INTENT [AMENDED 5/17/08]
It is the intent of this Ordinance to promote land use conformities, except that non-conforming conditions
that existed before the effective date of this Ordinance or amendments thereto shall be allowed to
continue, subject to the requirements set forth in this section. Except as otherwise provided in this
Ordinance, a non- conforming condition shall not be permitted to become more non-conforming.
SECTION 2.2 GENERAL
A. Transfer of Ownership: Non-conforming structures, lots, and uses may be transferred, and the new
owner may continue the non-conforming use or continue to use the non-conforming structure or lot,
subject to the provisions of this Ordinance.
B. Repairs and Maintenance: This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do not
involve expansion of the non-conforming use or structure, and such other changes in a non-
conforming use or structure as federal, state, or local building and safety codes may require.
C. Reduction in Lot Size: Except as expressly provided in this Section or for taking by eminent domain
or a conveyance in lie thereof, no lot shall be reduced in size by conveyance of a portion thereof
unless (1) the remaining land meets the minimum lot size required for the zoning district in which the
land is located, and (2) the land to be conveyed either meets the minimum lot size requirement or will
be conveyed to the owner of abutting property, the town, or to a conservation organization in
conjunction with covenants or similar restrictions that prohibit development. If the aforementioned lot
is conveyed to the owner of abutting property it must be combined with the abutter's property so that
said non- conforming lot is no longer a non-conforming lot.
SECTION 2.3 NON-CONFORMING STRUCTURES [AMENDED 5/17/08]
Expansions: A non-conforming structure may be added to or expanded after obtaining a permit from
the same permitting authority as for a new structure, if such addition or expansion does not increase
the non-conformity of the structure.
Further limitations within the Residential Shoreland District and Resource Protection District:
A. After January 1, 1989 if any portion of a structure is less than the required setback from the Royal
River, Chandler Brook, the East Branch, Toddy Brook, Deer Brook, Pratt's Brook, the unnamed
tributary to Chandler Brook, or a tributary stream, or the upland edge of Knight's Pond or the Deer
Brook wetland, that portion of the structure shall not be expanded, as measured in floor area or
volume, by 30 percent or more, during the lifetime of the structure. If a replacement structure
conforms to the requirements of Section 2.3.C.3. Reconstruction or Replacement, and is less than
the required setback from the aforementioned bodies of water, the replacement structure may not
be expanded if the original structure existing on January 1, 1989 had been expanded by 30 percent
in floor area and volume since that date.
B. Whenever a new, enlarged, or replacement foundation is constructed under a non-conforming
structure, the structure and new foundation must be placed such that the setback requirement is
met to the greatest practical extent as determined by the Planning Board or its designee, basing its
decision on the criteria specified in Section 2.3.C. Relocation. If the completed foundation does not
extend beyond the exterior dimensions of the structure, except for expansion in conformity with
Section 2.3.A.1, and the foundation does not cause the structure to be elevated by more than
3 additional feet, as measured from the uphill side of the structure (from the original ground level
Town of North Yarmouth Land Use Ordinance
Page 11 of 292
to the bottom of the first floor sill), it shall not be considered to be an expansion of the structure.
1. Relocation: A non-conforming structure may be relocated within the boundaries of the parcel on
which the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board, or its
designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules, or that a new system can be installed in compliance with the law
and said Rules. In no case shall a structure be relocated in a manner that causes the structure
to be more non-conforming. In determining whether the building relocation meets the setback to
the greatest practical extent, the Planning Board, or its designee, shall consider the size of the
lot, the slope of the land, the potential for soil erosion, the location of other structures on the
property and on adjacent properties, the location of the septic system and other on-site soils
suitable for septic systems, and the type and amount of vegetation to be removed to accomplish
the relocation within the Residential Shoreland District and/or Resource Protection District.
When it is necessary to remove vegetation in order to relocate a structure, the Planning Board
shall require replanting of native vegetation to compensate for the destroyed vegetation. In
addition, the area from which the relocated structure was removed must be replanted with
vegetation. Replanting shall be required as follows:
a. Trees removed in order to relocate a structure must be replanted with at least one native
tree, 3 feet in height, for every tree removed. If more than 5 trees are planted, no one species
of tree shall make up more than 50% of the number of trees planted. Replaced trees must be
planted no further from the water or wetland than the trees that were removed. Other woody
and herbaceous vegetation, and ground cover, that are removed or destroyed in order to
relocate a structure must be re-established. An area at least the same size as the area where
vegetation and/or ground cover was disturbed, damaged, or removed must be reestablished
within the setback area. The vegetation and/or ground cover must consist of similar native
vegetation and/or ground cover that was disturbed, destroyed or removed.
b. Where feasible, when a structure is relocated on a parcel the original location of the structure
shall be replanted with vegetation which may consist of grasses, shrubs, trees, or a
combination thereof.
C. Reconstruction or Replacement:
1. Within the Village Center District, Village Residential District and Farm and Forest District
the following shall apply: Any non-conforming structure which is located less than the required
setback from a property line, or does not meet the lot coverage requirements, and which is
removed, or damaged or destroyed, regardless of the cause may be reconstructed or replaced
provided that a permit is obtained within 2 years of the date of said damage or destruction, and
provided that such reconstruction or replacement is in compliance with the setback and lot
coverage requirements to the greatest practical extent as determined by the Planning Board in
accordance with the purposes of this Ordinance. The Planning Board shall consider any
opportunity to increase conformity based on the configuration of the lot, but in no case shall a
structure be reconstructed or replaced so as to increase its non-conformity.
2. Within the Residential Shoreland District and the Resource Protection District the following shall
apply:
a. Any non-conforming structure which is located less than the required setback from the Royal
River, Chandler Brook, the East Branch, Knight's Pond, the Deer Brook wetland, Toddy
Brook, Deer Brook, Pratt's Brook, the unnamed tributary to Chandler Brook or a tributary
stream, and which is removed, or damaged or destroyed, regardless of the cause, by more
Town of North Yarmouth Land Use Ordinance
Page 12 of 292
than 50 percent of the market value of the structure before such damage, destruction or
removal, may be reconstructed or replaced provided that a permit is obtained within one
year of the date of said damage, destruction, or removal, and provided that such
reconstruction or replacement is in compliance with the water or wetland setback
requirement to the greatest practical extent as determined by the Planning Board or its
designee in accordance with the purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its non-conformity. If the reconstructed or
replacement structure is less than the required setback it shall not be any larger than the
original structure, except as allowed pursuant to Section 2.3.C.1. Expansions, above, as
determined by the non-conforming floor area and volume of the reconstructed or replaced
structure at its new location. If the total amount of floor area and volume of the original
structure can be relocated or reconstructed beyond the required setback area, no portion of
the relocated or reconstructed structure shall be replaced or constructed at less than the
setback requirement for a new structure. When it is necessary to remove vegetation in order
to replace or reconstruct a structure, vegetation shall be replanted in accordance with
Section 2.3.C.2. Relocation, above.
b. Any non-conforming structure which is located less than the required setback from the Royal
River, Chandler Brook, the East Branch, Knight's Pond, the Deer Brook wetland, Toddy
Brook, Deer Brook, Pratt's Brook, the unnamed tributary to Chandler Brook, or a tributary
stream, and which is removed by 50 percent or less of the market value, or damaged or
destroyed by 50 percent or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
c. In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider in addition to the
criteria Section 2.3.B. Relocation, the physical condition and type of foundation present, if
any.
D. Change of Use of a Non-conforming Structure: The use of a non-conforming structure may not
be changed to another use unless the Planning Board after receiving a written application
determines that the new use will be consistent with the surrounding character and uses, and will
have no greater adverse impact on the water body, tributary stream or wetland, or on the subject
or adjacent properties and resources than the existing use. In determining that no greater adverse
impact will occur, the Planning Board shall require written documentation from the applicant,
regarding the probable effects on public health and safety, erosion and sedimentation, water quality,
fish and wildlife habitat, vegetative cover, visual and actual points of public access to waters, natural
beauty, flood plain management, archaeological and historic resources, and commercial fishing
activities, and other functionally water- dependent uses.
SECTION 2.4 NON-CONFORMING USES [AMENDED 5/17/08]
A. Expansions: Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within existing
residential structures or within expansions of such structures as allowed in Section 2.3.A.
Expansions.
B. Resumption Prohibited: A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use, may not
again be devoted to a nonconforming use except that the Planning Board may, for good cause
shown by the applicant, grant up to a one (1) year extension to that time period. This provision shall
not apply to the resumption of a use of a residential structure provided that the structure has been
used or maintained for residential purposes during the preceding five (5)year period.
Town of North Yarmouth Land Use Ordinance
Page 13 of 292
C. Change of Use: An existing non-conforming use may be changed to another non-conforming use
provided that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in Section
2.3.D. Change of Use of a Non- conforming Structure.
SECTION 2.5 NON-CONFORMING LOTS [AMENDED 5/17/08]
A. Within the Village Center District, Village Residential District, and Farm and Forest District the
following shall apply:
A non-conforming lot of record as of the effective date of this Ordinance (June 14, 2005) may be built
upon, without the need for a variance, provided that all provisions of this Ordinance except lot area,
lot width and/or lot frontage can be met. Variances relating to setback or other requirements not
involving lot area, lot width and/or frontage shall be obtained by action of the Zoning Board of Appeals
(ZBA). Further, a non- conforming lot of record as of the effective date of this Ordinance (June 14,
2005) does not have to be combined with a contiguous lot in the same ownership.
B. Within the Residential Shoreland District and the Resource Protection District the following shall
apply:
1. Non-conforming Lots: A non-conforming lot of record as of the effective date of this Ordinance
or amendment thereto may be built upon, without the need for a variance, provided that such lot
is in separate ownership and not contiguous with any other lot in the same ownership, and that
all provisions of this Ordinance except lot area, lot width and shore frontage can be met.
Variances relating to setback or other requirements not involving lot area, lot width or shore
frontage shall be obtained by action of the ZBA.
2. Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of the effective date of this ordinance provision (June 29, 1992)
if all or part of the lots do not meet the dimensional requirements of this Ordinance, and if a
principal use or structure exists on each lot, the non-conforming lots may be conveyed
separately or together, provided that the State Minimum Lot Size Law (12 M.R.S. Section 4807-
A through Section 4807- D) and the State of Maine Subsurface Wastewater Disposal Rules are
complied with.
If two or more principal uses or structures existed on a single lot of record on the effective date
of this ordinance provision (June 29, 1992), each may be sold on a separate lot provided that
the above referenced law and rules are complied with. When such lots are divided each lot thus
created must be as conforming as possible to the dimensional requirements of this Ordinance.
These provisions (B.2) shall also apply to those contiguous built lots that were conforming
between June 29, 1992 and June 14, 2005, but became non-conforming on June 14, 2005.
3. Contiguous Lots: Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person, persons or entity, on of the effective date of this
ordinance provision (June 29, 1992) and recorded in the registry of deeds if the lot is served by
a public sewer or can accommodate a subsurface sewage disposal system in conformance with
Town of North Yarmouth Land Use Ordinance
Page 14 of 292
the State of Maine Subsurface Wastewater Disposal Rules; and
a. Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
b. Any lots that do not meet the frontage and lot size requirements of Section 2-5.B.3.a
Contiguous Lot: Vacant or Partially Built, are reconfigured or combined so that each new lot
contains at least 100 feet of shore frontage and 20,000 square feet of lot area.
These provisions (B.3) shall also apply to those contiguous vacant or partially built lots that
were conforming between June 29, 1992 and June 14, 2005, but became non-conforming
on June 14, 2005.
SECTION 2.6 VESTED RIGHTS
Non-conforming use rights cannot arise by the mere filing of a notice of intent to build, an application for
building permits, or an application for required state permits and approvals. Such rights arise when actual
construction has begun, or in the case of pending applications, when the review process on a complete
application commences. For such construction to be legal at the time it is commenced the owner must
be in possession of and in compliance with validly issued permits, both state and local. Lots within any
subdivision, legally recorded in the Cumberland County Registry of Deeds as of the date of adoption of
this Ordinance (June 14, 2005), and made non-conforming by this Ordinance are deemed to have vested
rights. A pending application shall be deemed complete when so designated by a formal vote by the
Planning Board.
Town of North Yarmouth Land Use Ordinance
Page 15 of 292
lII. ADMINISTRATION AND ENFORCEMENT
SECTION 3.1 CODE ENFORCEMENT OFFICER (CEO) [AMENDED 5/17/08]
The Code Enforcement Officer (CEO) shall interpret and enforce the provisions of this Ordinance and shall
require compliance with its requirements and restrictions. The CEO shall adopt procedures to facilitate the
handling of all matters and questions arising hereunder within the scope of the CEO's authority and duties.
Any decisions of the CEO denying a permit shall be in writing, a copy of which shall be given to the
applicant. Appeals from decisions of the CEO shall be to the Zoning Board of Appeals (ZBA) in accordance
with the provisions of Section VI. Variances and Appeals.
The CEO shall conduct on-site inspections to insure compliance with all applicable laws and conditions
attached to permit approvals. The CEO shall also investigate all complaints of alleged violations of this
Ordinance.
The CEO shall keep a complete record of all essential transactions of the office, including applications
submitted, permits granted or denied, variances granted or denied, revocation actions, revocation of
permits, appeals, court actions, violations investigated, violations found, and fees collected. On a biennial
basis, a summary of all records associated with essential transactions in the Residential Shoreland District
and Resource Protection District shall be submitted to the Director of the Bureau of Land and Water Quality
within the Maine Department of Environmental Protection.
SECTION 3.2 APPROVALS AND PERMITS REQUIRED [AMENDED 5/17/08, 6/19/21]
Activities involving the use of land, the construction, structural alteration, repair, enlargement or
relocation of a building or structure, or the demolition of a building or structure may require approvals
and/or permits under the requirements of this Ordinance. All land use activities, including those that may
not otherwise require a permit, that are located within the Groundwater Protection Overlay District must
comply with Section 9.2. Groundwater Protection Overlay District: Best Management Practices. No
activity subject to an approval and/or permit shall commence until after the issuance of all required
approvals and permits. Any permit required by this Ordinance shall be in addition to any other permit
required by other law or ordinance. A person who is issued a permit pursuant to this Ordinance shall
have a copy of the permit on site while the work authorized by the permit is performed. The following
approvals or permits shall be required:
A. Building/Land Use Permit from the Code Enforcement Officer: No construction, structural
alteration, enlargement, or relocation of a building or structure, or land use activity requiring a permit
shall commence until after the issuance of a Building/Land Use Permit by the CEO in accordance
with Section 3.3. Building Permits/Land Use Permits. A building or land use permit for new
residential uses must meet the requirements of the Residential Growth Limitations in Section 3.3.E.
No building or land use permit shall be issued until the proposed construction or alteration complies
with the provisions of this Ordinance, approvals of the Planning Board or with a decision rendered by
the Zoning Board of Appeals, as applicable.
B. Driveway/Road Entrance Permit from Code Enforcement Officer: No person may build or
construct a driveway or road that provides access to a public street without first obtaining a
Driveway/Road Entrance Permit from the CEO in accordance with Section 8.4. Driveway/Road
Entrance Permit Requirements and the Town's Roadway Ordinance.
C. Demolition Permit from the Code Enforcement Officer: No demolition of a building or structure
or major portion thereof, shall commence until after the issuance of a Demolition Permit from the
CEO. When demolition is proposed for a building or structure that was constructed prior to
1900, the applicant must notify the North Yarmouth Historical Society in writing, and present
Town of North Yarmouth Land Use Ordinance
Page 16 of 292
evidence of such notification, at least 30 days prior to demolition. This provision will allow the
Historical Society time to contact the owner regarding voluntary preservation of any items or
structures with historical significance.
D. Site Plan Review Permit from the Planning Board: No use of land, buildings or structures listed
in Section VII. Zoning District Regulations, Table 7-1 and identified as requiring Site Plan Review
shall commence until after Site Plan Review approval has been obtained from the Planning Board in
accordance with Section IV. Site Plan Review and Conditional Use Procedures and the provisions
of this Ordinance. Further, a Site Plan Review permit is required for all development proposals
involving new construction, changes of use, or expansion of a structure or development, or
expansion of a use by way of new construction. These provisions are also applicable to clearing
and/or altering of land, construction of parking lots and roads and addition or alteration of accessory
uses associated with land use activities listed in Table 7-1. Land Uses by District, requiring Site Plan
Review. (See Section IV. Site Plan Review and Conditional Use Procedures, Section X.
Performance and Design Standards for Site Plan Review and Subdivision the town's Roadway
Ordinance, and other provisions of this Ordinance, as applicable.) [Amended 06/16/12]
E. Subdivision Approval from the Planning Board: Subdivision approval from the Planning Board
is required for all land and buildings proposed for subdivision. (See Section V. Subdivision Review
Procedures, Section X. Performance and Design Standards for Site Plan Review and Subdivision
and other provisions of this Ordinance, as applicable.)
F. Conditional Use Approval from the Planning Board: No use of land, buildings or structures listed
in Section VII. District Regulations, Table 7-1. Land Uses by District as requiring a Conditional Use
Permit shall commence until after approval has been obtained from the Planning Board pursuant to
Section IV. Site Plan Review and Conditional Use Procedures. Conditional uses require a Site Plan
Review permit from the Planning Board.
G. Variance from the Zoning Board of Appeals: Requests for a variance must be made to the
Zoning Board of Appeals in accordance with Section VI. Variances and Appeals.
H. Temporary Housing Permit: The CEO may issue permits for temporary housing for a period not
to exceed 6 months with one 6-month renewal possible. This provision is limited to the intended
occupants of a permanent dwelling unit that is being constructed or repaired and for which a
Certificate of Occupancy will be sought. [Amended 5/13/06]
SECTION 3.3 BUILDING/LAND USE PERMITS [AMENDED 5/17/08; 6/19/21; 3/15/22; 6/17/24]
All applications for building/land use permits shall be submitted to the CEO on forms provided for that
purpose.
A. Submissions: The application shall be accompanied by the following information:
1. A copy of the deed to the property, option to purchase the property or other documentation to
demonstrate right, title or interest in the property on the part of the applicant. All applications
shall be signed by an owner or individual who can show evidence of right, title or interest in the
property or by an agent, representative, tenant, or contractor of the owner with authorization from
the owner to apply for a permit, hereunder, certifying that the information in the application is
complete and correct.
2. Receipt of the application fee, payable to the Town of North Yarmouth
3. A schedule of construction, including beginning and completion dates.
Town of North Yarmouth Land Use Ordinance
Page 17 of 292
4. A map drawn to scale, showing the location, boundaries, dimensions, uses and size of the
following: site; type of structure; setbacks from the front, side, rear lot lines; signage; parking
areas; driveways; and existing and proposed streets, roads or ways. The map shall also show
the location of water lines, sewer lines, wells, septic systems and of all bodies of water, including
wetlands and their distances from all structures proposed for the site.
5. If the proposed use is located within the Residential Shoreland District or Resource
Protection District, evidence that there will be compliance with Section 9.1. Residential
Shoreland District and Resource Protection District Performance Standards.
6. If the proposed use is located within the Groundwater Protection Overlay District, evidence
that there will be compliance with Section 9.2. Groundwater Protection Overlay District: Best
Management Practices. The CEO may require that the applicant submit evidence of compliance
pursuant to the provisions of Section 4.5. Groundwater Protection Overlay District: Additional
Submission Requirements.
7. If the proposed use is located within the Royal River Corridor Overlay District, evidence that
there will be compliance with Section 9.3. Royal River Corridor Overlay District.
8. If the proposed development is located in within the Village Center District, a scaled drawing
providing evidence that the proposed building, renovation, or addition complies with Section
10.4 Building Standards.
9. Any other information necessary to show the proposal complies with the applicable provisions
of this Ordinance, including Section VIII. General Requirements: Applicable to All Land Uses.
10. Evidence that all other state and federal permits required by the proposal have been approved.
B. Subsurface Wastewater Disposal Permit Required: A building/land use permit shall only be
issued after a subsurface wastewater disposal permit has been secured (if required) by the
applicant or his authorized agent.
C. Action on Applications: All applications shall be dated, and the CEO shall note upon each
application the date and time of its receipt. Within 14 working days of the receipt of a complete
application for a building/land use permit, the CEO shall approve, deny, or refer such application to
the appropriate body. If the proposed activity requires Site Plan Review, Subdivision Review or
review as a Conditional Use the CEO shall refer the applicant to the Planning Board. If the proposed
activity requires a variance, the CEO shall refer the applicant to the Zoning Board of Appeals.
D. Conditions: Permits granted under this section may be made subject to reasonable conditions to
ensure conformity with the purposes and provisions of this Ordinance. The applicant shall have the
burden of proving that the proposed activity is in conformance with the purposes and provisions of
this Ordinance.
E. Residential Growth Limitation (Cap): In order to provide for orderly and reasonable growth, and
to minimize undue disruption of town services, including a situation in which the rapid completion
of major subdivisions, housing many families with school-age children, could outstrip the town's
capability to expand its schools and other services soon enough to avoid serious overcrowding,
building permits granted for construction of new residential units shall be limited on an annual basis,
as follows:
Town of North Yarmouth Land Use Ordinance
Page 18 of 292
1. Calendar Year 2007 and Beyond. For calendar year 2007 and beyond, the following shall
apply:
a. In the Village Center District and Village Residential District, combined, issuance of
building permits for residential dwelling units shall not exceed 15 dwelling units per year.
No single person, entity, corporation, or developer may apply for more than 6 new dwelling
permits per year.
b. In the Farm and Forest District, Residential Shoreland District and Resource
Protection District, combined, building permits granted for the construction of new
residential units shall not exceed 15 dwelling units per year. No single person, entity,
corporation or developer may apply for more than 3 new dwelling permits per year.
2. The Zoning Board of Appeals shall have discretion to vary these requirements in the event of
undue hardship based upon illness or disability.
3. Applications for residential building permits shall be processed in the order that the CEO
receives complete applications.
4. If the allowed number of residential building permits is not issued within the calendar year, they
shall not be carried over to the next year.
5. Exemptions: Exempted from the provisions of this section shall be the following:
a. Lots which are created by way of a gift, sale or lease to a person related to the donor (that
means a spouse, parent, grandparent, brother, sister, child, grandchild related by blood,
marriage or adoption);
b. A dwelling to be built upon a lot that has been owned by a resident of North Yarmouth for at
least 10 years, provided that resident both owned the property and has been a resident of
North Yarmouth for at least 10 years, and that the dwelling will be occupied by that resident.
c. Accessory dwelling units; and
d. Affordable Housing, as defined herein
6. Monitoring and Adjustment of the Residential Growth Limitation (Cap): The CEO shall
track the number of residential permits issued and residential units constructed in each Zoning
District on an annual basis. This data will be used to evaluate and adjust the Residential Growth
Cap. The Residential Growth Cap shall be reviewed and updated no later than June 2007 to
determine if it continues to be needed to control the pace, timing and location of development.
The Residential Growth Cap is intended to allow only modest growth within the Farm and Forest
District, Resource Protection District and Residential Shoreland District. The Residential Growth
Cap in the Village Center District and the Village Residential District is to be phased out. Any
future application of the residential growth cap shall be based on an evaluation of the
effectiveness of the land use regulations in controlling and directing growth, anticipated
population growth, and specific municipal needs, including the need for additional school
capacity. Any re-implementation of the residential growth cap in the Village Center District or
the Village Residential District beyond June 2007 shall require the following actions to be taken
and criteria to be met:
a. A clear, quantified assessment of the fiscal or other municipal capacity problems that
necessitate the continued imposition of a growth cap. The number of units, over and above
the cap that could be reasonably expected if the cap were lifted must be identified. The
Town of North Yarmouth Land Use Ordinance
Page 19 of 292
municipal services impacted by development and unable to accommodate the additional
units must be identified. Such identification will include a quantification of the services
required by each unit and a clear quantification of existing capacity, demonstrating the lack
of existing capacity.
b. The cap will be re-adjusted to allow growth at a rate demonstrated through the analysis
completed in a. above.
c. The Capital Investment Plan and the Capital Improvement Plan will be reviewed and
adjusted, as necessary, to address the capacity needs required to eliminate the growth cap.
F. Revision of Proposed Work: A new or revised building/land use permit is required if any
substantial changes are made in size, use, or construction of the structure, building or land after
issuance of the permit.
SECTION 3.4 EXPIRATION OF PERMITS [AMENDED 5/17/08]
Permits shall expire one year from the date of issuance of a permit if a substantial start is not made in
construction or in use of the property during that period. If a substantial start is made within one year of
issuance of a permit, the applicant shall have one additional year to complete the project, after which time
the permit shall expire.
SECTION 3.5 TRANSFER OF PERMITS
Valid permits from the Planning Board or the CEO or valid variances from the Zoning Board of Appeals
are transferable to a new owner or lessee of the property for which the permit or variance was given
provided that the new owner or lessee signs a statement that they will adhere to the conditions and
specifications of the issued permit. The new owners must conform to all construction, site development,
uses, and permit conditions as specified in the permit application and the permits from the Planning Board
or CEO, and any conditions attached in a valid variance from the ZBA. This provision of the Ordinance
does not supersede the expiration of permits as outlined in the previous Section 3.4 Expiration of Permits.
SECTION 3.6 CERTIFICATE OF OCCUPANCY
A Certificate of Occupancy shall be issued by the CEO upon satisfactory completion of construction
activities covered by the building/land use permit and shall remain effective so long as the use shall
comply with all local and state land use and safety requirements existing at the time of issuance. A
Certificate of Occupancy is required for all residential, commercial, institutional, industrial and other
buildings or structures. The CEO may issue a Temporary Housing Permit for a period of 6 months during
construction or alterations for partial occupancy of a building or structure pending its completion,
provided that such permit may require such conditions and safeguards as will protect the safety of the
occupants and the public. The CEO shall maintain a public record of all Certificates of Occupancy.
Failure to obtain a Certificate of Occupancy shall be a violation of this Ordinance.
SECTION 3.7 FEES [AMENDED 6/19/21]
The Select Board shall establish fees for all permits where permit fees have not been specified within
this Ordinance. A copy of the fee schedule shall be available from the Code Enforcement Officer.
Town of North Yarmouth Land Use Ordinance
Page 20 of 292
SECTION 3.8 PERFORMANCE GUARANTEES [AMENDED 6/17/24]
A. Purpose and Applicability: The purpose of performance guarantees is to assure that the
improvements proposed as a part of a development or subdivision are constructed and completed
properly. The Planning Board may require performance guarantees for land use activities that
require Site Plan Review pursuant to Section IV. Site Plan Review and Conditional Use Procedures,
and/or Subdivision Review pursuant to Section V. Subdivision Review Procedures.
B. Types of Guarantees: With submittal of the application for final plan approval, the applicant shall
provide one of the following performance guarantees for an amount adequate to cover the total
construction costs of all required improvements, taking into account the time-span of the
construction schedule and the inflation rate for construction costs:
1. Either a certified check payable to the town of North Yarmouth or a savings account or certificate
of deposit naming the Town as owner, for the establishment of an escrow account;
2. A performance bond payable to the town issued by a surety company, approved by the Select
Board;
3. An irrevocable letter of credit from a financial institution establishing funding for the construction
of the subdivision or development, from which the town may draw if construction is inadequate,
approved by the Select Board; or
4. An offer of conditional approval limiting the number of units built or lots sold until all required
improvements have been constructed.
The conditions and amount of the performance guarantee shall be determined by the Planning
Board with the advice of the Road Commissioner, Town Engineer, Select Board, and/or Town
Attorney.
C. Contents of Guarantee: The performance guarantee shall contain a construction schedule, cost
estimates for each major phase of construction taking into account inflation, provisions for
inspections of each phase of construction, provisions for the release of part or all of the performance
guarantee to the developer, and a date after which the applicant will be in default and the town shall
have access to the funds to finish construction.
D. Escrow Account: A cash contribution to the establishment of an escrow account shall be made by
either a certified check made out to the town, the direct deposit into a savings account, or the
purchase of a certificate of deposit. For any account opened by the applicant, the town shall be
named as owner or co- owner, and the consent of the town shall be required for a withdrawal. Any
interest earned on the escrow account shall be returned to the applicant unless the town has found
it necessary to draw on the account, in which case the interest earned shall be proportionately
divided between the amount returned to the applicant and the amount withdrawn to complete the
required improvements.
E. Performance Bond: A performance bond shall detail the conditions of the bond, the method for
release of the bond or portions of the bond to the applicant, and the procedures for collection by the
town. The bond documents shall specifically reference the subdivision or development for which
approval is sought.
F. Letter of Credit: An irrevocable letter of credit from a bank or other lending institution shall indicate
that funds have been set aside for the construction of the subdivision or development and may not
be used for any other project or loan.
Town of North Yarmouth Land Use Ordinance
Page 21 of 292
G. Conditional Agreement: The Planning Board at its discretion may provide for the applicant to enter
into a binding agreement with the town in lieu of the other financial performance guarantees. Such
an agreement shall provide for approval of the final plan on the condition that no more than a specified
number of lots may be sold or built upon until either:
1. It is certified by the Planning Board, or its agent, that all of the required improvements have
been installed in accordance with these regulations and the regulations of the appropriate
utilities; or
2. A performance guarantee, acceptable to the town, is submitted in an amount necessary to cover
the completion of the required improvements at an amount adjusted for inflation and prorated
for the portions of the required improvements already installed.
Notice of the agreement and any conditions shall be on the final plan that is recorded at the
Cumberland County Registry of Deeds. Release from the agreement shall follow the procedures for
release of the performance guarantees contained in Section H., below.
H. Phasing of Development: The Planning Board may approve plans to develop a major subdivision
or development in separate and distinct phases. This may be accomplished by limiting final approval
to those lots/units abutting that section of the proposed subdivision/development street, which is
covered by a performance guarantee. When development is phased, street construction shall
commence from an existing public way. Final approval of lots in subsequent phases shall be given
only upon satisfactory completion of all requirements pertaining to previous phases.
I.
Release of Guarantee: Prior to the release of any part of the performance guarantee, the Planning
Board shall determine to its satisfaction, in part upon the report of the Road Commissioner or other
qualified individual retained by the town and any other agencies and departments who may be
involved, that the proposed improvements meet or exceed the design and construction
requirements for that portion or phase of the subdivision or development for which the release is
requested.
J. Default: If upon inspection, the Road Commissioner or other qualified individual retained by the
town finds that any of the required improvements have not been constructed in accordance with the
plans and specifications filed as part of the application, he or she shall so report in writing to the CEO,
the Select Board, the Planning Board, and the applicant or developer. The Select Board shall take
any steps necessary to preserve the Town's rights.
K. Improvements Guaranteed: Performance guarantees shall be tendered for all improvements
required to meet the standards of this Ordinance, including, but not limited to, improvements for the
construction of the streets, storm water management facilities, public sewage collection or disposal
facilities, centrally managed water systems, and erosion and sedimentation control measures.
SECTION 3.9 CONFORMANCE WITH OTHER LAWS, REGULATIONS [AMENDED 6/19/21]
A. General: It is the applicant's responsibility to purse all required local, state and federal permits. All
existing and proposed land use activities shall be in conformance with all pertinent local, state, and
federal ordinances, statutes, laws and regulations. The applicant must comply with all permit
conditions and restrictions.
Town of North Yarmouth Land Use Ordinance
Page 22 of 292
B. Maine Site Location Act Reviews: If the proposed development requires a permit under the Maine
Site Location Act, 38 M.R.S. §§ 481-489-E, the developer must secure the approval of both the
Department of Environmental Protection (DEP) and the Planning Board. When a proposed
development requires approval of the Planning Board and the DEP, each review may be conducted
simultaneously. However, each review will be conducted independently, and the Planning Board
may deny approval of the development even though the DEP has granted an approval under the
Provisions of the Site Location Act.
SECTION 3.10 LEGAL ACTION AND VIOLATIONS [AMENDED 5/17/08; 6/19/21]
A. Nuisances and Enforcement: Any violation of this Ordinance shall be deemed to be a nuisance.
It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance.
B. Notice: If the Code Enforcement Officer finds that any provision of this Ordinance is being or has
been violated, he shall notify in writing the person(s) responsible for such violation and order the
action necessary to correct it, including discontinuance of illegal use of land, buildings, structures,
or work being done, removal of illegal buildings or structures, and abatement of nuisance conditions.
A copy of such notices shall be forwarded to the Town Manager and the Select Board, and
maintained as a permanent record.
C. Enforcement Action: When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Select Board, upon notice from the CEO, are hereby directed to
institute any and all actions and proceedings, either legal or equitable, including seeking injunctions
of violations and the imposition of civil penalties, that may be appropriate or necessary to enforce
the provisions of the Ordinance in the name of municipality. The Select Board, or their authorized
agent, are hereby authorized to enter into administrative consent agreements for the purpose of
eliminating violations of this Ordinance and recovering fines without Court action. Such agreements
shall not allow an illegal structure or use to continue unless there is clear and convincing evidence
that the illegal structure or use was constructed or conducted as a direct result of erroneous advice
given by an authorized municipal official and there is no evidence that the owner acted in bad faith,
or unless the removal of the structure or use will result in a threat or hazard to public health and
safety or will result in substantial environmental damage.
D. Penalties: Any person, including but not limited to a landowner, a landowner's agent or a contractor,
who violates any provision or requirement of this Ordinance shall be penalized in accordance with
30-A, M.R.S. Section 4452.
Town of North Yarmouth Land Use Ordinance
Page 23 of 292
IV. SITE PLAN REVIEW AND CONDITIONAL USE PROCEDURES
SECTION 4.1 PURPOSE
The Site Plan Review and Conditional Use provisions set forth in this Ordinance are intended to protect
the public health and safety, promote the general welfare of the community, and conserve the environment
by assuring that land use activities are designed and developed in a manner which assures that adequate
provisions are made for traffic safety and access; emergency access; water supply; sewage disposal;
management of stormwater, erosion, and sedimentation; protection of the groundwater; protection of the
environment, wildlife habitat, fisheries, high value open space areas and other unique natural areas;
protection of historic and archaeological resources; minimizing the adverse impacts on adjacent properties;
and fitting the project harmoniously into the natural and man-made fabric of the community.
SECTION 4.2 APPLICABILITY
A. Site Plan Review Permit Required: This Section is applicable to all land use activities listed in
Section VII. Zoning District Regulations, Table 7-1. Land Uses by District, as requiring Site Plan
Review by the Planning Board. These provisions shall apply to development proposals involving
new construction, changes of use, or expansion of a structure or development, or expansion of a
use by way of new construction. These provisions are also applicable to the clearing and/or altering
of land, construction of parking lots, streets and roads and addition or alteration of accessory uses
associated with land use activities listed in Table 7-1 and identified as requiring Site Plan Review.
In all instances the burden for providing the information upon which the permitting authority bases
its findings and decision lies with the applicant.
B. Conditional Use Approval Required: All land uses activities listed in Section VII. Zoning District
Regulations, Table 7.1. Land Uses by District as requiring a Conditional Use Permit in addition to
Site Plan Review shall also be subject to the requirements of this Section, including Section 4.6
Conditional Uses.
SECTION 4.3 REVIEW AND APPROVAL AUTHORITY [AMENDED 6/19/21; 6/17/24]
A. Planning Board Authorization: The Planning Board is authorized to review and act on all site
plans for development requiring Site Plan Review or Conditional Use approval. In considering site
plans and conditional uses under this provision, the Planning Board may act to approve, disapprove,
or approve the project with conditions as are authorized by these provisions. In issuing any decision,
the Planning Board shall make written findings of fact establishing that a proposed development
does or does not meet the standards of this Ordinance, including, but not limited to, Section VII.
Zoning District Regulations and Section X. Performance and Design Standards for Site Plan Review
and Subdivision Review; and Section Special District Standards and Section XI. Standards for
Specific Activities, as applicable.
B. Staff Review Team established. There is hereby created a Staff Review Team. The Staff Review
Team shall consist of the Code Enforcement Officer, Fire Rescue Chief, Road Commissioner, Town
Engineer, and Town Planner, or their designees.
C. Waivers:
1. Application Requirements: The Planning Board may waive any of the submission requirements
in this ordinance based upon a written request by the applicant. The applicant shall utilize the
Town's Waiver Request form for any request. Such request must be made at the time of the
pre-application conference or at the initial review of the application if no pre-application
conference is held and provide narrative justifying the request. A waiver of any submission
requirement may be granted only if the Planning Board finds that the information is not required
Town of North Yarmouth Land Use Ordinance
Page 24 of 292
to determine compliance with the standards of the relevant ordinance standard. The Planning
Board shall consider the size, character and intensity of the proposed project in determining
which requirements may be waived.
2. Performance standards. The Planning Board may waive any of the review standards found in
Section VIII. General Requirements: Applicable to All Uses, Section X. Performance and Design
Standards for Site Plan Review and Subdivision Review and Section XI. Standards for Specific
Activities, if it finds that extraordinary and unnecessary hardships, not self-imposed, may result
from strict compliance with the review standards.
a. In all cases, waivers shall not be deemed a right of the applicant, but rather shall be granted
at the discretion of the Planning Board.
b. The applicant shall utilize the Towns Waiver Request form for any request.
3. Waivers of Performance Standards to be shown on Approved Plan: All waivers of performance
standards granted by the Planning Board shall be noted on the approved plan, including the
date on which they were granted.
SECTION 4.4 PROCEDURES [AMENDED 6/19/21; 4/30/22; 6/17/24]
The Planning Board shall use the following procedures in reviewing applications for Site Plan Review and
Conditional Uses:
A. Pre-application Meeting:
1. Prior to submitting a formal application for Site Plan Review, the applicant is required to attend
two (2) pre-application meetings, the first with the Staff Review Team and the second with the
Planning Board. Additional staff may be invited to attend the pre-application meeting at the
discretion of the CEO. The pre-application meetings shall be informal and informational in nature.
There shall be no fee for a pre-application review, and such review shall not cause the plan to
be a pending application or proceeding under Title 1 M.R.S. §302. No decision on the substance
of the plan shall be made at the pre-application meeting.
2. The purposes of the pre-application meetings are to:
a. Allow the CEO, staff and Planning Board to understand the nature of the proposed use and
the issues involved,
b. Allow the applicant to understand the development review process and required submissions,
including the required fees,
c. Identify any issues that need to be addressed in the formal application, and
d. Make the applicant aware of any opportunities for coordinating the development with
community policies, programs, or facilities.
3. Site Visit: At the pre-application meeting, the Planning Board may schedule a site visit if deemed
necessary.
4. Information Required: There are no formal submission requirements for a pre-application
meeting. However, the applicant is encouraged to submit a sketch plan and narrative, and be
prepared to describe the following topics:
a. The proposed site, including its location, size, and general characteristics (a sketch plan
Town of North Yarmouth Land Use Ordinance
Page 25 of 292
of the site and proposed project is strongly recommended),
b. The nature of the proposed use and potential development,
c. A site inventory, analysis and a narrative and/or plan describing how the proposed
development plan relates to the site inventory and analysis,
d. Copies of any available deeds and easements affecting the subject lot(s),
e. Any issues or questions about existing municipal regulations and their applicability to the
project,
f.
Any requests for waivers from the submission requirements.
5. Site Plan Review Applications within the Groundwater Protection Overlay District: The CEO shall
notify the Yarmouth Water District of the date, time and place of the pre-application meeting at
least seven (7) days prior to the conference if the proposed use is to be located within the
Groundwater Protection Overlay District.
6. Site Plan Review Applications within the Royal River Corridor Overlay District: The CEO shall
notify the Royal River Conservation Trust of the date, time and place of the pre-application
meeting at least seven (7) days prior to the conference if the proposed use is to be located
within the Royal River Corridor Overlay District.
B. Application Submission and Review Procedures: The applicant shall prepare and submit a Site
Plan Review application, including a development plan and supporting documentation meeting the
submission requirements set forth below. This material shall be submitted to the Code
Enforcement Officer (CEO).
1. The CEO shall make a preliminary determination of whether the application is ready for Planning
Board review within fourteen (14) days of receipt, before the application is placed on the
Planning Board's agenda.
a. The CEO or their designee shall notify the applicant in writing of this finding. If the CEO
determines that the application is ready for Planning Board review, the notice shall specify
the additional materials required to make the application ready for review and shall advise
the applicant that the application will not be considered by the Board until the additional
information is submitted.
2. The Office of the CEO shall circulate copies of the application to the Staff Review Team.
[Amended 6/12/10]
3. If the proposed use is located within the Groundwater Overlay District, the applicant shall mail
a complete copy of the application to the Yarmouth Water District at least fourteen (14) days
prior to the date of the first meeting at which the application is to be considered.
4. Within thirty (30) days of the receipt of a formal Site Plan Review application, the Planning Board
shall review the material and determine whether or not the submission is complete. If the
application is determined to be incomplete, the Planning Board may vote to either table the
application to a specific date and time or reject the application. The CEO will notify the applicant in
writing of this finding. If the application is rejected, a future submission will be reviewed as a
new application.
5. Public Hearing: Upon a determination that a complete application has been submitted for
review, the Planning Board may decide a public hearing is necessary. The hearing shall be held
Town of North Yarmouth Land Use Ordinance
Page 26 of 292
within thirty (30) days of finding the application complete, or at the next regularly scheduled
Board meeting, after the Board's determination it has received a complete application, whichever
occurs first. The CEO will publish the notice of the date, time, and place of the hearing in a
newspaper of general circulation in the town & town website, the date of the publication to be at
least seven (7) days prior to the hearing. The applicant shall notify all property owners within
five hundred (500) ft of the parcel on which a proposed development is located at least fourteen
(14) days prior to the meeting at which the application is to be considered. The notice shall
include an accurate description of the project, date, time & location of the public hearing and
the availability of the application for review via certified mail. The Applicant must contact the
CEO for abutter list thirty (30) days prior to the meeting. Evidence of mailing shall be submitted
to the CEO prior to the hearing; provided, however that the failure of any abutting property owner
to receive a notice of public hearing shall not necessitate another hearing, nor shall it invalidate
any decision of the Planning Board with regard to that particular application.
6. If the applicant wishes to submit additional information, the supplemental information must be
submitted to the CEO at least ten (10) days prior to the Planning Board meeting where it is to
be considered, otherwise the supplemental information will not be included in Board packets for
that meeting. New or updated materials will only be allowed at the meeting at the discretion of the
Planning Board Chair.
7. Site Visit: The Planning Board may hold a site visit to review the existing conditions, field verify
the information submitted and investigate a development proposal. The Planning Board may
schedule this visit either before or after the first meeting at which the application is considered.
The Planning Board shall reserve the right to postpone a scheduled site visit, if the Board Chair
determines that the site visit is not possible due to surface conditions on the site or inclement
weather conditions, or due to the unavailability of Planning Board members. The CEO shall
notify the applicant of the site visit.
8. The Planning Board shall act to deny, to approve, or to approve the application with conditions.
The Planning Board may impose such conditions as are deemed advisable to ensure
compliance with the standards of approval.
9. Written Findings of Fact: In issuing its final decision, the Planning Board shall make written
findings of fact establishing that the proposed development does or does not meet the
standards of approval and other requirements of the town. The Planning Board shall vote to
approve the written findings of fact, which shall be included in the final written decision.
10. The Board shall authorize the CEO to notify the applicant of the action of the Planning Board,
including the findings of fact, and any conditions of approval. This requirement can be met
through the distribution of minutes of the meeting containing the findings of fact and decision of
the Planning Board.
11. All time limits provided for in this section may be extended by mutual agreement of the applicant
and Planning Board.
C. Final Approval and Filing: Upon completion of the requirements of this Section and an approval
vote by the majority vote of the Planning Board, the application shall be deemed to have final
approval and the site plan shall be signed by the majority of the members of the Planning Board
and must be filed with the CEO.
1. It is the applicant's responsibility to ensure that a complete application is filed with the CEO with
sixty (60) days of the date upon which such plan is approved and signed by the Planning Board,
or the permit shall be null and void.
2. If any phasing is proposed for the project, the applicant shall provide a phasing plan, with the
Town of North Yarmouth Land Use Ordinance
Page 27 of 292
required performance guarantee, that includes the following information:
a. A map depicting the proposed phases of the project.
b. Approximate dates for construction start and completion for each phase of the project.
c. A construction management plan depicting items such as, but not limited to, construction
access, material storage and any other information that will help the Planning Board
understand the details related to the project's phased construction.
d. A phased site plan approval shall be valid for 5 (five) years from the original date of Planning
Board approval. The first phase must be commenced within 2 years of approval, and each
phase must be completed prior to commencing subsequent phases.
D. Post-approval coordination
1. Performance Guarantee
a. Performance guarantees shall be secured in accordance with Section 3.8 Performance
Guarantees, for all projects that involve work on the items listed in subsection 2.b, below
2. Inspection of Required Improvements.
a. At least five (5) days prior to commencing construction of required improvements, the
developer shall:
a. Notify the CEO in writing of the time when (s)he proposes to commence construction of
such improvements, so that the CEO can arrange for inspections to assure that all
town specifications, requirements, and conditions of approval are met during the
construction of required improvements, and to assure the satisfactory completion of
improvements and utilities required by the Planning Board.
b. Deposit with the Select Board a check made out to the town of North Yarmouth for the
amount recommended by the Town Engineer. These funds shall be used by the town to
establish an escrow in order to hire the services of a Maine registered professional
engineer to review the specifications for all improvements, and to inspect the
construction, including, but not limited to all improvements with public or private rights-
of-way, as well as lighting, sidewalks, storm water facilities, water lines, sewer lines, and
landscaping outside any rights-of-way, and all conditions of final approval. If these funds
are sufficient to cover the cost of said review and inspection, the remaining funds shall
be returned to the developer after satisfactory completion of the improvements, including
cleanup. If the funds are not enough to cover said review and inspection, the developer
shall submit additional funds to the Town to cover inspection fees.
c. If the inspecting official finds upon inspection of the improvements that any of the
required /improvements have not been constructed in accordance with the plans and
specifications filed by the developer, he shall so report in writing to the CEO and the
developer. The town shall take any steps necessary to assure compliance with the
approved plans.
3. If at any time it appears necessary or desirable to modify the required improvements before or during the
construction of the required improvements, the inspecting official is authorized to approve minor
modifications due to unforeseen circumstances such as encountering hidden outcrops of bedrock,
natural springs, etc. The inspecting official shall issue any approval under this section in writing and shall
transmit a copy of the approval to the CEO and the Planning Board. Revised plans shall be filed with the
Town of North Yarmouth Land Use Ordinance
Page 28 of 292
Planning Board. For major modifications, such as relocation of rights-of-way, property boundaries,
changes of grade by more than 1 percent, etc., the subdivider shall obtain permission from the Planning
Board to modify the plans.
E. Fees:
1. Application Fee: An application fee, if required, must accompany an application for site plan
review. This fee is intended to cover the cost of the town's administrative processing of the
application. The application shall be accompanied by a non-refundable fee as specified in the
Town of North Yarmouth Application, License and Permit Fees Ordinance, to be paid to the town
of North Yarmouth stating the specific purpose of the fee. [Amended 6/12/10]
2. Technical Review: A technical review escrow is required at the time of application to cover the
cost of any contract planning services. In addition, the Planning Board may refer the developer
to a firm, or individual chosen by the Planning Board, for legal, technical, or engineering peer
review of any submissions. The developer shall pay to the town a sum that the peer reviewer
shall budget as sufficient to cover the cost of said review. If after final approval, the sum
deposited with the town was more than sufficient to cover the cost, the town shall return the
unexpended funds to the developer. If the deposit was not sufficient, the developer shall pay the
balance to the town prior to final approval by the Board. If the Board deems a public hearing is
necessary, the applicant shall be responsible for the cost associated with the public notice
requirements.
3. Establishment of Fees and Escrow: The Select Board may, from time to time and after
consultation with the Planning Board and/or CEO, establish the appropriate application fees
and technical review escrow following posting of the proposed schedule of fees and public
hearing.
F. Submission Requirements:
1. Applications for Site Plan Review and/or a Conditional Use must be submitted on application
forms provided by the town. The complete application form, evidence of payment of the required
fees, and the required plans and related information must be submitted to the CEO. The
submission must contain at least the following exhibits and information unless specifically
waived in writing.
2. All Applications for Site Plan Review and/or Conditional Use Approval must contain the
following information:
b. A fully executed and signed copy of the application for site plan review, plus ten (10) copies
of the same or as requested by the CEO.
c. Evidence of payment of the application and technical review fees.
d. Ten (10) copies of written materials plus ten (10) sets of maps or drawings containing the
information listed below, along with one (1) electronic version of the entire submission. The
written materials must be contained in a bound report. The original maps or drawings must
be at a scale sufficient to allow review of the items listed under the approval standards and
criteria, but in no case shall be more than 100 feet to the inch for that portion of the tract of
land being proposed for development. Map sets may be reduced to a size of 11 by 17 inches.
e. General Information:
1) Record owner's name, address, and phone number and applicant's name, address and
phone number, if different.
2) Names and addresses of all property owners within 500 feet of any and all property
Town of North Yarmouth Land Use Ordinance
Page 29 of 292
boundaries.
3) Sketch map showing general location of the site within the town based upon a reduction
of the tax maps.
4) Boundaries of all contiguous property under the total or partial control of the owner or
applicant regardless of whether all or part is being developed at this time.
5) The tax map and lot number of the parcel or parcels on which the project is located.
6) A copy of the deed to the property, an option to purchase the property or other
documentation to demonstrate right, title or interest in the property on the part of the
applicant.
7) The name, registration number, and seal of the person who prepared the plan, if
applicable.
8) Evidence of the applicant's technical and financial capability to carry out the project as
proposed.
e. Existing Conditions:
1) Zoning classification(s), including overlay districts, of the property and the location of
zoning district boundaries if the property is located 2 or more zoning districts and/or
overlay districts or abuts a different district.
2) The bearings and length of all property lines of the property to be developed and the
source of this information. The Planning Board may waive this requirement of a boundary
survey when sufficient information is available to establish, on the ground, all property
boundaries.
3) Location and size of any existing sewer and water mains, culverts and drains, on-site
sewage disposal systems, wells, underground tanks or installations, and power and
telephone lines and poles on the property to be developed, on abutting streets, or land
that may serve the development, and an assessment of their adequacy and condition to
meet the needs of the proposed use. Appropriate elevations must be provided as
necessary to determine the direction of flow.
4) Location, names, and present widths of existing public and/or private roads and rights-
of-way within or adjacent to the proposed development.
5) The location, dimensions and ground floor elevation of all existing buildings on the site.
6) The location and dimensions of existing driveways, streets, roads, parking and loading
areas, walkways, and sidewalks on or immediately adjacent to the site.
7) Location of intersecting streets, roads or driveways within two hundred (200) feet of the
site.
8) The location of open drainage courses, rivers, ponds, wetlands, vernal pools, streams,
brooks, stonewalls, graveyards, fences, stands of trees, and other important or unique
natural areas and site features, including but not limited to, 100-year floodplains, deer
wintering areas, significant wildlife habitats, fisheries, scenic areas, habitat for rare and
endangered plants and animals, unique natural communities and natural areas, sand
and gravel aquifers, and historic and/or archaeological resources, together with a
Town of North Yarmouth Land Use Ordinance
Page 30 of 292
description of such features.
9) Any project involving structural development or soil disturbance on or adjacent to sites
listed on, or eligible to be listed on the National Register of Historic Places shall be
submitted by the applicant to the Maine Historic Preservation Commission for review
and comment at least thirty (30) days prior to action being taken by the Planning Board.
The Planning Board shall consider comments received from the Maine Historic
Preservation Commission prior to rendering a decision on the application.
10) The direction of existing surface water drainage across the site.
11) The location, front view, dimensions, and lighting of existing signs.
12) The location of all required building setbacks and any existing buffers on the property.
13) Location and dimensions of any existing easements and copies of existing covenants or
deed restrictions.
14) The location of the nearest fire hydrant, dry hydrant or other water supply for fire
protection.
15) All projects shall include written certification as to the location of the 100-year floodplain
boundary to include a map of the 100-year floodplain boundary overlaid onto a U.S.G.S.
Quadrangle Map or other topographic map by a professional land surveyor, registered
professional engineer or architect. The determination shall be based on engineering
practices recognized by the Federal Emergency Management Agency (FEMA) and the
provisions of the Town's Floodplain Management Ordinance, including the most recent
FEMA maps for the Town. All proposals shall include base flood elevations, flood
boundaries, and, in a riverine 100-year floodplain, floodway data. These determinations
shall be based on engineering practices recognized by FEMA. The development plan
should include a statement that building is prohibited on the 100-year floodplain, and the
restriction shall be included in any deed, lease, purchase and sale agreement, or
document transferring or expressing intent to transfer any interest in real estate or
structure.
f.
Proposed Development Activity:
1) Estimated demand for water supply and sewage disposal together with the location and
dimensions of all provisions for water supply and wastewater disposal, and evidence of
their adequacy for the proposed use, including soils test pit data if on-site sewage
disposal is proposed.
2) The direction of proposed surface water drainage across the site and from the site, with
an assessment of impacts on downstream properties.
3) Provisions for handling all solid waste, including hazardous and special wastes and the
location and proposed screening of any on-site collection or storage facilities.
4) The location, dimensions, and materials to be used in the construction of proposed
driveways, parking and loading areas, and walkways and any changes in traffic flow
onto or off-site.
5) A proposed landscaping and buffering plan. The landscaping plan submitted with each
application shall identify major existing and proposed trees, shrubs, bushes, plant
material, ground cover and natural features such as boulders and rock outcroppings. It
Town of North Yarmouth Land Use Ordinance
Page 31 of 292
shall show present or proposed locations and planting details. The applicant shall
include in the plan proposed methods to protect existing trees and growth during and
after construction. These may include fences, berms, curbing, tree walls and similar
devices.
6) The location and description of any stream, pond, vernal pool and/or wetland buffers as
required in Section 10.3. Brook, Pond, Vernal Pool and Wetland Buffers. When buffers
are required in accordance with Section 10.3 Brook, Pond, Vernal Pool and Wetland
Buffers, the following plan submissions shall be required:
a. The site plan shall show identified wetland types, the layout of the buffer and the
topography of the site. The extent of existing and proposed vegetation and the pre
and post development topography shall be depicted on the plan.
b. Description of the existing vegetation in the proposed buffer area.
c. If a new buffer is proposed, a description of how the buffer will be developed.
d. Description of provisions for maintenance of the buffer area including restrictions
on earth moving and vegetation clearing.
e. List of deed restrictions and covenants to be included in deed to all affected
properties or lots. A drawing with the buffer location and markers shall be attached
to the deed.
f.
Plat with buffer location, marker locations, maintenance provisions, and a list of
deed restrictions and/or covenants.
7) The location, dimensions, and ground floor elevation of all proposed buildings or building
expansions proposed on the site.
8) Building elevations showing all sides of the proposed buildings and structures on the
site, any existing features and structures proposed to be retained on the site, and
abutting buildings, structures and architectural features, such as stone walls and fences,
if such buildings, structures or features are located within 100 feet of the site.
9) Location, front view, materials, and dimensions of proposed signs together with the
method for securing the sign.
10) The location of all utilities, including fire protection systems.
11) A general description of the proposed use or activity, including but not limited to the type
of use, square footage involved, hours of operation, types and types and amount of
traffic to be generated.
12) If the proposed development requires driveways or entrances onto a state or state aid
highway, a permit from the Maine Department of Transportation indicating that the
driveway or entrances conform to Title 23, section 704 and any rules adopted under that
section;
13) An estimate of the peak hour and daily traffic to be generated by the project. A traffic
impact analysis demonstrating the impact of the proposed project on the capacity, level
of service and safety of adjacent streets, if the project or expansion will provide parking
for 50 or more vehicles or generate more than 100 trips during the a.m. or p.m. peak
hour based upon the latest edition of the Trip Generation Manual of the Institution of
Traffic Engineers.
14) Storm water calculations, erosion and sedimentation control measures, and water
quality and/or phosphorous export management provisions, if the project requires a
storm water permit from the Maine Department of Environmental Protection or if the
Town of North Yarmouth Land Use Ordinance
Page 32 of 292
Planning Board determines that such information is necessary based upon the scale of
the project or the existing conditions in the vicinity of the project.
15) A utility plan showing, in addition to provisions for water supply and wastewater disposal,
the location and nature of electrical, telephone, cable TV, and any other utility services
to be installed on the site.
16) Graphic representations of how the development will look upon completion using artist
renderings, photo manipulation, computer generated imaging or similar techniques. The
submission of such graphic representations is encouraged for all applications, and many
be required by the Planning Board where they determine that the location, scale or
nature of the proposal requires such graphic representations to enable the Board to
evaluate the application under the performance and design standards of this Ordinance.
17) A grading plan showing the existing and proposed topography of the site at 2-foot
contour intervals, or such other interval as the Planning Board may determine.
18) A planting schedule keyed to the site plan indicating the general varieties and sizes of
trees, shrubs, and other vegetation to be plated on the site, as well as information
pertaining to provisions that will be made to retain and protect existing trees, shrubs,
and other vegetation.
19) A storm water drainage and erosion control program showing:
a. The existing and proposed method of handling storm water runoff.
b. The direction of flow of the runoff, through the use of arrows.
c. The location, elevation, and size of all catch basins, dry wells, drainage ditches,
swales, retention basins, and storm sewers.
d. Engineering calculations used to determine drainage requirements based upon the
25-year 24-hour storm frequency; this is required only if the project will significantly
alter the existing drainage pattern due to such factors as the amount of new
impervious surfaces (such as paving and building area) being proposed.
e. Methods of controlling erosion and sedimentation during and after construction.
f.
A written Soil Erosion and Control Plan shall be required when the total disturbance
area is greater than 20,000 square feet per acre.
g. A written Soil Erosion and Control Plan shall be required for all developments that
propose to remove any natural vegetation and disturb the soil within the Royal
River Corridor Overlay District.
20) A groundwater impact analysis prepared by groundwater hydrologist for projects
involving on-site water supply or sewage disposal facilities with a capacity of 2,000
gallons or more per day.
a. If a site requires an on-site subsurface sewage disposal system it shall be installed
in conformance with the State of Maine Subsurface Wastewater Disposal Rules
(Rules). The applicant shall submit evidence of site suitability for subsurface
sewage disposal prepared by a Maine Licensed Site Evaluator in full compliance
with the requirements of the Rules. A test pit analysis, prepared by a Maine
Licensed Site Evaluator shall be provided. A map indicating the location of all test
pits dug on the site shall also be submitted.
21) A written statement from any utility district providing service to the project as to the
adequacy of the water supply in terms of quantity and pressure for both domestic and
fire flows, and the capacity of the sewer system to accommodate additional wastewater
if public water or sewerage will be utilized.
Town of North Yarmouth Land Use Ordinance
Page 33 of 292
22) A written statement from the Yarmouth Water District stating that adequate supply and
pressure for both domestic and fire-fighting purposes can be provided without placing
an undue burden on the source, treatment facilities, or distribution system involved. The
development shall be responsible for paying the costs of system improvements
necessary to serve the development.
23) Cost of the proposed development and evidence of the applicant's financial capacity to
complete it. This evidence should be in the form of a letter from a bank or other source
of financing indicating the name of the project, amount of financing proposed or available,
and individual's or institution's interest in financing the project or in the form of a letter
from a certified accountant or annual report indicating that the applicant has adequate
cash flow to cover anticipated costs.
g. Approval Block: Space must be provided on the plan drawing for the signatures of the
Planning Board and date together with the following words, "Approved: Town of North
Yarmouth, North Yarmouth Planning Board".
G. Minor Changes to Approved Plans: [Amended 06/16/12]
Minor changes in approved plans necessary to address field conditions may be approved by the
Code Enforcement Officer, at the discretion of the Code Enforcement Officer, provided that any
such change does not affect compliance with the standards of this Ordinance or the approved plan
or alter the essential nature of the proposal. Without limitation, minor changes shall not include (1)
a change to a public or private right-of-way or easement, (2) a decrease in proposed buffering or
landscaping, or (3) any issue involving a condition placed on the site plan approval.
H. Amendments: [Amended 06/16/12]
Any alteration to a site which is inconsistent with the approved site plan shall require an amendment
to the site plan. Any alteration other than alterations approved by the CEO pursuant to Section 4.4
(F) shall require Planning Board approval prior to the alteration. The applicant may request that
changes to an approved site plan that are not subject to approval under Section 4.4 (F) be placed
on the Planning Board Agenda.
Prior to placement on the Agenda, the applicant shall meet with the Code Enforcement Officer to
review the proposed changes and shall provide ten (10) copies of the revised site plan to the CEO
at least fourteen (14) days prior to the next regular Planning Board meeting together with such other
materials, which the CEO may limit, to address the scope of the proposed change to the site plan.
The Board, at its discretion, may limit their review to the proposed amendments and other related
elements.
SECTION 4.5 GROUNDWATER PROTECTION OVERLAY DISTRICT: ADDITIONAL SUBMISSION
REQUIREMENTS
A. Requirements: In addition to the other requirements of this Section, all submittals for permit
approval in the Groundwater Protection Overlay District shall include the following list of
submissions, as applicable (See Section 9.2. Groundwater Protection Overlay District: Best
Management Practices). The permitting authority, Planning Board or CEO, may modify or waive
any of the following submission requirements because of the size or nature of the project or
circumstances of the site such that requirement(s) would not be applicable and would not affect or
conflict with the purposes of this Ordinance. The applicant shall provide information and materials
as will enable the permitting authority to determine that standards for approval have been met,
including appropriate hydrogeologic assessments, if applicable.
B. Submissions:
Town of North Yarmouth Land Use Ordinance
Page 34 of 292
1. A Site Plan drawn to scale showing the following information:
a. The boundaries of the Groundwater Protection Overlay District, labeled if crosses the parcel
b. The location, size and description of all storage tanks and areas and types of materials to
be stored
c. Location and size, capacity and design of subsurface waste disposal systems and grease
traps
d. Location of nearby wells or surface water bodies
e. Location of existing or proposed monitoring wells
f.
Locations and dimensions of buildings, parking, streets and roads and any other impervious
structures or surfaces
2. Written information:
a. Complete list of all chemicals, pesticides, fuels, nutrients (fertilizers, manure) and other
potentially toxic or hazardous materials to be used or stored on the premises, and the
quantities of these materials
b. List of equipment to be used, parked, or stored
c. Groundwater protection and pollution prevention provisions, and provisions to follow
best management practices (including long-term maintenance provisions)
d. Spill prevention plans and personnel training, if applicable
e. Proposed method of performance guarantee, if applicable
f.
Any restrictions, conditions, covenants and easements
g. A hydro geologic assessment of the proposed use or activity's impact on groundwater
h. Background water quality data from on-site monitoring wells
i.
Any other information necessary to prove that the activity or use will not adversely impact
the groundwater quality.
C. Additional Requirements for Certain Activities: More than one of the categories listed below
may apply to a particular use. Applicants should review the Best Management Practices in Section
9.2 Groundwater Protection Overlay District: Best Management Practices, and request assistance
from the CEO and/or Planning Board should there be questions as to which categories apply.
1. Subsurface Wastewater Disposal, Sewage Disposal and Subsurface Injection:
Provisions for sewage disposal including:
a. Soil evaluator's report and septic system design
b. Location of test pits keyed to site evaluator's or soil scientist's report
c. For sites/uses producing more than 1,000 gallons of sewage per day, a hydrogeologic
Town of North Yarmouth Land Use Ordinance
Page 35 of 292
assessment of nitrate concentrations at the property line
d. Evaluation of public/private sewer system capacity and integrity of sewer lines serving the
development by a registered professional engineer or the sewer system superintendent
e. Provisions and designs for all floor drains, grease traps, and holding tanks
2. Construction/Demolition Provisions for solid waste, waste materials, and chemical
handling, storage and disposal:
a. Provisions for sanitary facility
b. Provisions for fuel storage and refueling
c. Provisions for storage of any liquid chemicals used in the construction process
d. Provisions for storage of any bulk chemicals used in the construction process
e. Spill clean-up plans, personnel responsible for inspections and clean-up, spill clean up
materials available on-site
3. Storm Water Management: Engineering calculations and plans that provide:
a. Design and capacity of subsurface collection facilities
b. Location and design of culverts, drains and other storm water control structures, existing
and proposed
c. Surface drainage plan
d. Design of dry wells, storage, retention or detention facilities and other surface water
impoundments
e. Storm water system outlets
f.
Delineation of post development drainage areas
g. Plans for ice control, use of road salt, and snow removal
4. Other Impoundments: Engineering calculations and plans that provide:
a. Design and capacity of subsurface collection facilities
b. Design of dry wells, storage, retention or detention facilities and other surface water
impoundments
c. Storm water system outlets
d. Delineation of post development drainage areas
e. Plans for ice control, use of road salt, and snow removal
f.
Description of source of water, use of water and final water quality (water quality parameters
to be specified by applicant)
Town of North Yarmouth Land Use Ordinance
Page 36 of 292
g. Amount of consumptive and non-consumptive water use
5. Hazardous Materials, Petroleum Products and Other Chemicals: Handling and Storage
a. Type and volume of chemical compounds handled and/or stored.
b. Site plan showing all storage, handling and use areas for raw materials and wastes
c. For outside areas, details to contain spills including:
1) Drainage and contour information to prevent the flow of runoff from entering the
storage area and which keep leaks or spills from flowing off site
2) Provisions for secondary containment where chemical storage occurs
3) Provisions to collect chemicals should they enter the drainage system
4) Provisions to segregate underground systems to insure that there are no cross
connections
5) Statement of emergency measures which can be implemented for surface drainage
systems, including mutual aid agreements with hazardous materials spill response
contractors
d. For inside areas, details to contain spills including the:
1) Design of dikes around rooms
2) The location of floor drains and floor drain outlets
3) The location of separators, holding tanks and/or drain outlets
4) The specific location and design of underground storage structures
5) The location and design of piping systems for wash waters and other wastes
6) Measures to insure that inappropriate wastes are discharged and that wastes are
discharged to appropriate sewers or treatment systems
e. A spill prevention and control and countermeasure (SPCC) plan detailing:
1) Materials and equipment to be available
2) A training plan and schedule
3) A list of contacts (Town/Water District/EPA/DEP/local fire officials) with phone numbers
4) An inspection schedule
f.
A report by an industrial professional engineer or other competent professional detailing:
1) Steps which have been taken to reduce the use of hazardous materials
2) Actions which have been taken to control the amount of wastes generated
Town of North Yarmouth Land Use Ordinance
Page 37 of 292
3) Any reports to provide information on the design theory or methodology for the above
features
6. Installation of Monitoring Wells
a. Location and construction specifications
b. Intended purpose
c. Sampling schedule and responsible parties
d. Provisions for informing appropriate CEO and Yarmouth Water District of sampling results
SECTION 4.6 ROYAL RIVER OVERLAY DISTRICT: ADDITIONAL SUBMISSION REQUIREMENTS
A. Purpose: Refer to Section 9.3. Royal River Corridor Overlay District in the Land Use Ordinance for
information related to the purpose and land areas included in this district.
B. Applications for a single-family dwelling, accessory dwelling unit or home occupation in this zoning district
shall contain the following information:
1. Completed building/land use application form - all applications for building/land use permits
shall be submitted on forms provided for that purpose.
2. A copy of the deed to the property, option to purchase the property or other documentation to
demonstrate right, title or interest in the property on the part of the applicant.
3. Receipt of the application fee, payable to the town to North Yarmouth
4. A schedule of construction, including beginning and completion dates
5. A map drawn to scale, showing the location, boundaries, dimensions, uses and size of the
following: site; type of structure; setbacks from the front, side, rear lot lines; signage; parking
areas; and existing and proposed driveways or right-of ways. The map shall also show the
location of water lines, sewer lines, wells, septic systems and of all bodies of water, including
wetlands and their distances from all structures proposed for the site.
6. A written erosion and sedimentation control plan for activity during construction and after
construction.
7. Any other information necessary to show the proposal complies with the applicable provisions
of this Ordinance, including Section VIII. General Requirements: Applicable to All Land Uses,
and Section 9.3 Royal River Corridor Overlay District.
8. A list of all other state and federal permits required by the proposal.
9. Evidence that a subsurface wastewater disposal permit has been secured (if required) by the
applicant or his authorized agent.
C. Standards for Site Plan Review: Uses listed in Section VII. Zoning District Regulations, Table 7-1.
Land Uses by District, as requiring Site Plan Review in the Royal River Corridor Overlay District shall
be designed to preserve open space and the natural vegetation of the corridor consistent with the
town's vision for the Royal River Corridor as described in the Comprehensive Plan and the Open
Space Plan. In addition to the submission requirements in Section 3.3. Building/Land Use Permits,
the Planning Board shall require that the location of the building envelope be identified on the plan
and a written description of the best management practices that will be used to limit soil erosion and
sedimentation for all activities within the corridor that will involve disturbance of the natural vegetation,
both during and after construction be submitted. The Planning Board may require that the best
Town of North Yarmouth Land Use Ordinance
Page 38 of 292
management practices be pursuant to Section 9.1.U. Erosion and Sedimentation Control.
SECTION 4.7 CONDITIONAL USES
A. Purpose: The purpose of this section is to establish procedures and standards to enable the
Planning Board to review applications for Conditional Uses. A Conditional Use is a structure or use
that is generally not appropriate in a given district, but with restrictions and if controlled as to
location, size and off-site impacts may have no adverse effects upon the public health, safety or
welfare, surrounding properties, the natural environment, or on municipal services. The only
structures or uses that shall be permitted as conditional uses are those approved as Conditional
Uses by the Planning Board.
B. Conditional Use Approval Required: A building, structure or parcel of land may be used for a
conditional use if the use is specifically listed as a conditional use in Section VII. Zoning District
Regulations, Table 7-1. Land Uses by District, and Conditional Use approval is granted by the
Planning Board. Any project involving the establishment of a new conditional use or the construction
or expansion of a building, structure or activity for a conditional use must obtain site plan approval
in accordance with this Section, Section V. Site Plan Review and Conditional Use Procedures, in
addition to obtaining Conditional Use approval from the Planning Board.
C. Action on the Application for a Conditional Use Permit: The Planning Board may affirm, with
conditions, or deny the application for a Conditional Use permit. The Planning Board may authorize
issuance of a Conditional Use permit, upon a showing that:
1. The proposed use will not place a burden on municipal services which, due to its location or the
characteristics of the site or proposed development, is significantly greater than the burden that
would result from similar uses in other situations;
2. The proposed use will not create hazards to vehicular or pedestrian traffic on the streets, roads
and sidewalks serving the proposed use as determined by the size and condition of such streets,
roads and sidewalks, lighting, drainage, intensity of use by both pedestrians and vehicles, and the
visibility afforded to pedestrians and the operators of motor vehicles;
3. The proposed use will not cause water pollution, sedimentation, erosion, contaminate any water
supply nor reduce the capacity of the land to hold water so that a dangerous, aesthetically
unpleasant, or unhealthy condition may result;
4. The proposed use will not create unhealthful conditions because of smoke, dust, or other
airborne contaminants;
5. The proposed use will not create nuisances to neighboring properties because of odors, fumes,
glare, hours of operation, noise, vibration or fire hazard, or unreasonably restricted access of
light and air to neighboring properties;
6. The proposed location for the use has no peculiar physical characteristics due to its size, shape,
topography, or soils that will create or aggravate adverse environmental impacts on surrounding
properties;
7. The proposed use will not adversely affect the value of adjacent properties; and
8. The design and external appearance of any proposed building will constitute an attractive and
compatible additional to its neighborhood, although it need not have a similar design,
appearance or architecture.
D. Conditions of Approval:
Town of North Yarmouth Land Use Ordinance
Page 39 of 292
1. The Planning Board may attach conditions to its approval of a Conditional Use. These
conditions may include, but are not limited to, such requirements as:
a. Off-street improvements
b. Access restrictions
c. Hours of use
d. Buffering and screening
e. Monitoring wells for subsurface sewage disposal systems as required in Section 10.17.
f.
Utility improvements
g. Performance guarantees
2. The Planning Board may require that the terms of any conditions of approval be recorded in
the Cumberland County Registry of Deeds.
E. Duration of a Conditional Use Approval:
1. Provided all conditions and standards of approval are met, a Conditional Use shall be a continuing
grant of permission for as long as the property is used for such purposes. The Conditional Use
shall expire if the owner:
a. Physically alters the property and/or structure so it can no longer be used for the
Conditional Use, or
b. Ceases to use the property for the approved Conditional Use for one year or more, or
c. Fails to initiate the operation or conduct of the Conditional Use within one year of the date
of the Planning Board's vote to grant said approval.
2. A Conditional Use may be expanded in area or function only with the granting of new Conditional
Use approval by the Planning Board.
Town of North Yarmouth Land Use Ordinance
Page 40 of 292
V.
SUBDIVISION REVIEW PROCEDURES AND CRITERIA
SECTION 5.1 PURPOSES
The purposes of these regulations are:
1. To provide for an expeditious and efficient process for the review of proposed subdivisions;
2. To clarify the approval criteria of the state Subdivision Law, Title 30-A M.R.S., §4404;
3. To assure new development in the town meets the goals and conforms to the policies of the
Comprehensive Plan;
4. To assure the comfort, convenience, safety, health and welfare of the people of the town;
5. To protect the environment and conserve the natural and cultural resources identified in the
Comprehensive Plan as important to the community;
6. To assure that a minimal level of services and facilities are available to the residents of new
subdivisions and that lots in subdivisions are capable of supporting the proposed uses and
structures;
7. To minimize the potential impacts from new subdivisions on neighboring properties and on the town;
and
8. To promote the development of an economically sound and stable community.
SECTION 5.2 AUTHORITY AND ADMINISTRATION [AMENDED 6/17/24]
These regulations are in accordance with the provisions of Title 30-A M.R.S., §§4401-4408.
A. Authority. The Planning Board shall administer these regulations. The provisions of these
regulations shall pertain to all land and buildings proposed for subdivision within the boundaries of
the town of North Yarmouth.
B. Waivers
1. Application Requirements: The Planning Board may waive any of the submission requirements
in this ordinance based upon a written request by the applicant. The applicant shall utilize the
Town's Waiver Request form for any request. Such request must be made at the time of the
pre-application conference or at the initial review of the application if no pre-application
conference is held and provide narrative justifying the request. A waiver of any submission
requirement may be granted only if the Planning Board finds that the information is not required
to determine compliance with the standards of the relevant ordinance standard. The Planning
Board shall consider the size, character and intensity of the proposed project in determining
which requirements may be waived.
2. Performance standards. The Planning Board may waive any of the review standards found in
Section VIII. General Requirements: Applicable to All Uses, Section X. Performance and Design
Standards for Site Plan Review and Subdivision Review and Section XI. Standards for Specific
Activities, if it finds that extraordinary and unnecessary hardships, not self-imposed, may result
from strict compliance with the review standards.
a. In all cases, waivers shall not be deemed a right of the applicant, but rather shall be granted
at the discretion of the Planning Board.
b. The applicant shall utilize the Towns Waiver Request form for any request.
3. Waivers of Performance Standards to be shown on Approved Plan: All waivers of performance
standards granted by the Planning Board shall be noted on the approved plan, including the
date on which they were granted.
Town of North Yarmouth Land Use Ordinance
Page 41 of 292
SECTION 5.3 PRE-APPLICATION MEETINGS, SKETCH PLAN AND SITE VISIT [AMENDED 6/19/21;
6/17/24]
A. Purpose: The purpose of the pre-application meetings and site visit are for the applicant to present
general information regarding the proposed subdivision to the Staff Review Team and Planning
Board and receive the comments prior to the expenditure of substantial sums of money on
surveying, soils identification, and engineering by the applicant.
B. Procedure:
1. The applicant shall present the pre-application sketch plan to the Staff Review Team prior to
being placed on a Planning Board agenda for pre-application sketch plan review.
2. The applicant shall present the pre-application sketch plan and make a verbal presentation
regarding the site and the proposed subdivision. Following the applicant's presentation, the
Board may ask questions and make suggestions to be incorporated by the applicant into the
application. The date of the on-site inspection may be selected at this time.
3. The CEO shall notify the Yarmouth Water District (if applicable) of the proposed subdivision, the
number of dwelling units proposed, the length of streets and roads, and the size and construction
characteristics of any permitted building types with multiple residentials units, and commercial
or industrial buildings. The CEO shall request that these officials comment upon the adequacy
of their department's existing capital facilities to service the proposed subdivision.
C. Submission: The pre-application sketch plan shall show in simple sketch form the proposed layout
of streets, lots, buildings and other features in relation to existing conditions. The sketch plan, which
does not have to be engineered and may be a free-hand penciled sketch, should be supplemented
with general information to describe the existing conditions of the site and the proposed
development. It will be most helpful to both the applicant and the Planning Board to show site
conditions such as high value open space areas (listed B.3), steep slopes, wet areas and vegetative
cover to be identified in a general manner. It is recommended that the sketch plan be superimposed
on or accompanied by a copy of the assessor's map(s) on which the land is located. The sketch
plan shall be accompanied by:
1.
A copy of a portion of the U.S.G.S. topographic map and an aerial map of the area showing
the outline of the proposed subdivision unless the proposed subdivision is less than 10 acres
in size.
2. A copy of that portion of the Cumberland County Soil Survey covering the proposed
subdivision, showing the outline of the proposed subdivision.
3. A copy of any available deeds, easements and encumbrances applicable to the proposed
subdivision.
D. Site Visit: The Planning Board may hold a site visit of the property to review existing conditions,
field verify the information submitted and investigate a development proposal. The Planning
Board may schedule this visit either before or after the first meeting at which the application is
considered. The Planning Board shall reserve the right to postpone the site visit, if the Board Chair
determines that the site visit is not possible due to surface conditions of the site and inclement
weather conditions, or due to the unavailability of Planning Board members. The CEO shall notify
the applicant of the site visit.
Town of North Yarmouth Land Use Ordinance
Page 42 of 292
E. Rights not Vested: The pre-application meeting, the submittal or review of the sketch plan or the
site visit shall not be considered the initiation of the review process for the purposes of bringing
the plan under the protection of Title 1 M.R.S. §302.
SECTION 5.4 SPECIAL SUBMISSION REQUIREMENTS
A. Yarmouth Water District Review Required for Subdivisions Within the Groundwater
Protection Overlay District or Proposing to Utilize the Public Water Supply: If any portion of
the subdivision is located within the Groundwater Protection Overlay District, or is to be served
by the public water supply, the applicant shall submit complete preliminary and final plans, as
submitted to the Planning Board, to the Yarmouth Water District, and obtain written comments
from the Yarmouth Water District regarding the subdivision's impact on the public water supply,
and/or the District's agreement to provide public water service to the development, if applicable.
The Yarmouth Water District's input shall be advisory.
SECTION 5.5 MINOR SUBDIVISION [AMENDED 6/19/21; 4/30/22; 6/17/24]
A. General: The Planning Board may require, where it deems necessary to make a determination
regarding the criteria for approval from Title 30-A M.R.S. §4404 (See Section 5.12 Subdivision
Review Criteria), or the standards of this Ordinance, that a Minor Subdivision comply with some
or all of the submission requirements for a Major Subdivision.
B. Procedure:
1. Within (6) months after the site visit by the Planning Board, the applicant shall submit an
application to the CEO for approval of a final plan at least thirty (30) days prior to a scheduled
meeting of the Planning Board. Failure to submit the application within six (6) months shall
require resubmission of the sketch plan to the Planning Board. The final plan shall
approximate the layout shown on the sketch plan, plus any recommendations made by the
Planning Board. [Amended 6/12/10]
2. Application Fee: The application shall be accompanied by a non-refundable fee as
specified in the Town of North Yarmouth Application, License and Permit Fees Ordinance,
to be paid by check to the town of North Yarmouth stating the specific purpose of the fee.
[Amended 6/12/10]
3. Technical Review: A technical review escrow is required at the time of application to cover
the cost of the any contract planning services. In addition, the Planning Board may refer the
developer to a firm, or individual chosen by the Planning Board, for legal, technical, or
engineering peer review of any submissions. The developer shall pay to the town a sum
that the peer reviewer shall budget as sufficient to cover the cost of said review. If after final
approval, the sum deposited with the town was more than sufficient to cover the cost, the
town shall return the unexpended funds to the developer. If the deposit was not sufficient,
the developer shall pay the balance to the town prior to final approval by the Planning Board.
If the Planning Board deems a public hearing is necessary, the applicant shall be
responsible for the public notice requirements in subsection 7 below.
4. The applicant, or his duly authorized representative, shall attend the meeting of the Planning
Board to present the final plan. At the meeting at which an application for final plan approval
of a minor subdivision is initially presented, the Planning Board shall issue a dated receipt
to the applicant
a. Require that the applicant notify in writing all large and small public drinking water
suppliers, if any portion of the subdivision is within a water source protection area, and
Town of North Yarmouth Land Use Ordinance
Page 43 of 292
provide evidence that the notification was mailed.
b. Require that the applicant notify the clerk and the review authority of the neighboring
municipalities if any portion of the subdivision abuts or crosses the municipal boundary,
and provide evidence that the notification was mailed.
5. If at any time, the applicant wishes to bring additional information before the Board, the
supplemental information must be submitted to the CEO at least ten (10) days prior to the
Planning Board meeting, otherwise the supplemental information will not be included in
Board packets for that meeting. New or updated materials will only be allowed at the meeting
at the discretion of the Planning Board Chair.
6. Determination of a Complete Application: Within thirty (30) days of the receipt of the final
plan application, the Board shall determine whether the application is complete and notify
the applicant in writing of its determination. If the application is not complete, the Planning
Board shall notify the applicant of the specific additional material needed to complete the
application.
7. Public Hearing: Upon a determination that a complete application has been submitted for
review, the Planning Board may decide a public hearing is necessary. The hearing shall be
held within thirty (30) days of finding the application complete, or at the next regularly
scheduled Board meeting, after the Board's determination it has received a complete
application, whichever occurs first. The CEO will publish the notice of the date, time, and place
of the hearing in a newspaper of general circulation in the town & town website, the date of
the publication to be at least seven (7) days prior to the hearing. The applicant shall notify
all property owners within five hundred (500) ft of the parcel on which a proposed
development is located at least fourteen (14) days prior to the meeting at which the
application is to be considered. The notice shall include an accurate description of the
project, date, time & location of the public hearing and the availability of the application for
review via certified mail. The Applicant must contact the CEO for abutter list thirty (30) days
prior to the meeting. Evidence of mailing shall be submitted to the CEO prior to the hearing;
provided, however that the failure of any abutting property owner to receive a notice of public
hearing shall not necessitate another hearing, nor shall it invalidate any decision of the
Planning Board with regard to that particular application.
8. Findings of Fact and Decision: Within thirty (30) days from the public hearing or within 60
days of determining a complete application has been received, if no hearing is held, or within
another time limit as may be otherwise mutually agreed to by the Planning Board and the
applicant, the Planning Board shall make findings of fact, and conclusions relative to the
criteria contained in Title 30-A M.R.S. §4404, Section 5.12. Subdivision Review Criteria,
and the other requirements of the Ordinance. If the Planning Board finds that all the criteria
of the Statute and the requirements of this Ordinance have been met, they shall approve
the final plan. If the Planning Board finds that any of the review criteria of the statute or
Section 5.12. Subdivision Review Criteria, or the standards of Section X. Performance and
Design Standards for Site Plan Review and Subdivisions Review, or any other provisions of
this Ordinance have not been met, the Planning Board shall either deny the application or
approve the application with conditions to ensure all of the criteria and standards will be met
by the subdivision. The Planning Board shall issue a written notice of its decision to the
applicant, including it findings, conclusions and any reasons for denial or conditions of
approval.
C. Submissions: The final plan application shall consist of the following items:
1. A complete application form, along with ten (10) copies of all required submissions plus one
Town of North Yarmouth Land Use Ordinance
Page 44 of 292
(1) electronic copy of all submission materials.
2. Location Map: The location map shall be drawn at a size adequate to show the relationship
of the proposed subdivision to the adjacent properties, and to allow the Planning Board to
locate the subdivision within the town. The location map shall show:
a. Existing subdivisions in the proximity of the proposed subdivision.
b. Locations and names of existing and proposed roads and streets.
c. Boundaries and designations of zoning districts, including overlay districts.
d. An outline of the proposed subdivision and any remaining portion of the owner's property
if the final plan submitted covers only a portion of the owner's entire contiguous holding.
3. Final Plan: Two (2) full size plan sets measuring twenty-four (24) by thirty-six (36) inches
along with eight (8) reduced size plan sets measuring eleven (11) by seventeen (17) inches,
along with 10 copies of all submission materials must accompany the subdivision
application.
a. The plan shall be drawn to a scale of not more than one hundred (100) feet to the inch.
Plans for subdivisions containing more than one hundred (100) acres may be drawn at
a scale of not more than two hundred (200) feet to the inch provided all necessary detail
can easily be read.
b. If any part of the subdivision is located within the Groundwater Protection Overlay
District, a reduced copy of the plan and all accompanying material shall be provided to
the Yarmouth Water District no less than 7 days prior to the meeting.
4. Submission Requirements: The application for approval of a Minor Subdivision shall
include the following information. The Planning Board may require additional information to
be submitted, where it finds necessary in order to determine whether the criteria of Title 30-
A M.R.S §4404 or Section 5.12 Subdivision Review Criteria, are met.
a. Proposed name of the subdivision, or identifying title, and the name of the town in which it
is located, plus the assessor's map and lot numbers.
b. Verification of right, title, or interest in the property.
c. A standard boundary survey of the parcel, giving complete descriptive data by bearings and
distances, made and certified by a registered land surveyor. The corners of the parcel shall
be located on the ground and marked by monuments. The plan shall indicate the type of
monument found or to be set at each lot corner.
d. A copy of the most recently recorded deed for the parcel. A copy of all deed restrictions,
easements, rights-of-way, or other encumbrances currently affecting the property.
e. A copy of any deed restrictions intended to cover all or part of the lots or dwellings in the
subdivision.
f. An indication of the type of sewage disposal to be used in the subdivision.
i)
If a project requires an on-site subsurface sewage disposal system it shall be installed in
conformance with the State of Maine Subsurface Wastewater Disposal Rules (Rules).
The applicant shall submit evidence of site suitability for subsurface sewage disposal
prepared by a Maine Licensed Site Evaluator in full compliance with the requirements of
the Rules. A test pit analysis, prepared by a Maine Licensed Site Evaluator shall be
provided. A map indicating the location of all test pits dug on the site shall also be
Town of North Yarmouth Land Use Ordinance
Page 45 of 292
submitted.
ii) When sewage disposal is to be accomplished by connection to the public sewer, a
written statement from the sewer district, stating that the district has the capacity to
collect and treat the wastewater, shall be provided.
g. An indication of the type of water supply system(s) to be used in the subdivision.
i)
When water is to be supplied by public water supply,
(1) a written statement from the Yarmouth Water District stating that adequate
supply and pressure for both domestic and fire-fighting purposes can be
provided without placing an undue burden on the source, treatment facilities,
or distribution system involved.
(2) A written statement from the Yarmouth Water District and the North Yarmouth
Fire Chief approving the complete design of the water supply system including
the materials, size and location of mains, gate valves, hydrants and service
connections.
ii) When water is to be supplied by private wells, evidence of adequate ground water supply
and quality shall be submitted by a well driller or a hydrogeologist familiar with the area.
h. The date the plan was prepared, north point, and graphic map scale.
i. The names and addresses of the record owner, applicant, and individual or company who
prepared the plan, and adjoining property owners.
j. A high intensity soil survey by a Maine certified soil scientist. Wetland areas shall be identified
on the survey, regardless of size.
k. The number of acres within the proposed subdivision, location of property lines, existing
buildings, vegetative cover type, and other essential existing physical features. On wooded
sites, the plan shall indicate the area where clearing for lawns and structures shall be
permitted and/or any restrictions to be placed on clearing existing vegetation. [Amended
5/13/06]
l.
The location of all rivers, streams, brooks, wetlands, vernal pools or other water bodies
within or adjacent (within 150 feet) to the proposed subdivision. When buffers are required
in accordance with Section 10.3 Brook, Pond, Vernal Pool and Wetland Buffers, the
following plan submissions shall be required:
i)
The site plan shall show identified wetland types, the layout of the buffer and the
topography of the site. The extent of existing and proposed vegetation and the
pre and post development topography shall be depicted on the plan.
ii) Description of the existing vegetation in the proposed buffer area.
iii) If a new buffer is proposed, a description of how the buffer will be developed.
iv) Description of provisions for maintenance of the buffer area including restrictions
on earth moving and vegetation clearing.
v) List of deed restrictions and covenants to be included in deed to all affected
properties or lots. A drawing with the buffer location and markers shall be
attached to the deed.
vi) Plat with buffer location, marker locations, maintenance provisions, and a list of
deed restrictions and/or covenants.
Town of North Yarmouth Land Use Ordinance
Page 46 of 292
m. Contour lines at the interval specified by the Planning Board, showing elevations in relation
to mean sea level.
n. The zoning district(s) in which the proposed subdivision is located and location of any zoning
boundaries affecting the subdivision.
o. The location and size of existing and proposed sewers, water mains, culverts, and drainage
ways on or adjacent to the property to be subdivided.
p. The location, names, and present widths of existing streets and highways, and existing and
proposed easements, building lines, parks and other open spaces on or adjacent to the
subdivision. The plan shall contain sufficient data to allow the location, bearing and length
of every street line, lot line, and boundary line to be readily determined and be reproduced
upon the ground. These lines shall be tied to reference points previously established.
q. In order to facilitate the addition of the subdivision into the town property records and
geographic information system, the applicant shall submit subdivision plans in electronic
format in AutoCAD, GIS or other similar format (if available). Survey grade GPS data
(specifically pin locations, wetland boundaries, etc.) when available, should also be
submitted; these data should be clearly attributed so a user knows what the points/lines are
referring to.
r. The location of any open space to be preserved and a description of proposed
improvements and its management. If any portion of the subdivision is located within the
Royal River Corridor Overlay District, a Royal River Corridor Management Plan that includes
the location of any building envelops, preserves natural beauty, enhances wildlife habitat
and corridors, considers public access to water bodies and inter-connected trails, and shows
how the subdivision development will contribute to the town's vision for the Royal River
Corridor as described in the town's Comprehensive Plan and the Open Space Plan.
iii) Additionally, the following items must be submitted:
(1) A description of all common open space and any other lands and facilities
proposed to be owned by the Town, a conservation organization, or a
homeowner's association, or that will be permanently protected by
conservation easements. This description shall include a map indicating the
approximate location of these lands and facilities.
(2) A description of proposed ownership arrangements for the parcels as
identified in Section 10.23.D.1.
(3) A description of the proposed conservation restrictions that will permanently
protect these parcels.
(4) A description of the proposed arrangements and the responsible party for the
long-term stewardship of the common open space including management
objectives and techniques for each parcel or area.
iv) The Planning Board may waive the recreation & open space land requirements
set forth in Section 10.23 if the Planning Board makes a written finding,
supported by an explanation, that the useable open space and/or recreation land
is not necessary due to the location of the proposed development near existing
publicly accessible open space/recreation land; or where there are no
opportunities to contribute to a network of open space land, or interconnected
trails, walkways and/or bicycle paths. The applicant must submit a written
request for the waiver and provide evidence necessary for the Planning Board
to make it writing findings.
Town of North Yarmouth Land Use Ordinance
Page 47 of 292
s. All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Written offers to convey title to the town or a Planning Board approved land trust,
conservation organization or other public entity, of all public open spaces shown on the plan,
and copies of agreements or other documents showing the manner in which open spaces
to be retained by the applicant or lot owners are to be maintained shall be submitted. If open
space or other land is to be offered to the town, written evidence that the Select Board are
satisfied with the legal sufficiency of the written offer to convey title shall be included. If any
of the open space and/or facilities are to be reserved by the individual unit owners as common
open space, the developer shall be required prior to final subdivision plan approval to
incorporate a homeowners' association consisting of the individual unit owners, which
incorporation must comply with Section 11.09 Homeowner/Property Owners' Associations.
t. All projects shall include written certification as to the location of the 100-year floodplain
boundary to include a map of the 100-year floodplain boundary overlaid onto a U.S.G.S.
Quadrangle Map or other topographic map by a professional land surveyor, registered
professional engineer or architect. The determination shall be based on engineering
practices recognized by the Federal Emergency Management Agency (FEMA) and the
provisions of the Town's Floodplain Management Ordinance, including the most recent
FEMA maps for the Town. All proposals shall include base flood elevations, flood
boundaries, and, in a riverine 100-year floodplain, floodway data. These determinations
shall be based on engineering practices recognized by FEMA. The final plan should include
a statement that building is prohibited on the 100-year floodplain, and the restriction shall
be included in any deed, lease, purchase and sale agreement, or document transferring or
expressing intent to transfer any interest in real estate or structure.
u. A hydrogeologic assessment prepared by a Maine certified geologist or Maine registered
professional engineer, experienced in hydrogeology, when public sewer does not serve the
subdivision and any part of the subdivision is located within the Groundwater Protection
Overlay District or the subdivision has an average density of more than one dwelling unit
per 100,000 square feet. The Planning Board may require a hydrogeologic assessment in
other cases where site considerations or development design indicate potential of adverse
impacts on ground water quality. These cases include extensive areas of shallow to bedrock
soils; or cluster developments in which the average density is less than one dwelling unit
per 100,000 square feet but the density of the developed portion is in excess of one dwelling
unit per 80,000 square feet; or proposed use of shared or common subsurface wastewater
disposal systems. The hydrogeological assessment shall be conducted in accordance with
the provisions of Section 10.24. Water Quality.
v. An estimate of the amount and type of vehicular traffic to be generated on a daily basis and
at peak hours. The Planning Board may require that the trip generation rates used shall be
taken from the Trip Generation Manual, 1991 edition, or most recent edition, published by the
Institute of Transportation Engineers. Trip generation rates from other sources may be used
if the applicant demonstrates these sources better reflect local conditions, and if approved
by the Planning Board.
w. If the proposed subdivision requires driveways or entrances onto a state or state aid
highway, a permit from the Maine Department of Transportation indicating that the driveway
or entrances conform to 23 M.R.S. § 704 and any rules adopted under that section;
x. For subdivisions involving forty (40) or more parking spaces or projected to generate more
than four hundred (400) vehicle trips per day, a traffic impact analysis, prepared by a Maine
registered professional engineer with experience in traffic engineering, shall be submitted.
Town of North Yarmouth Land Use Ordinance
Page 48 of 292
The analysis shall indicate the expected average daily vehicular trips, peak-hour volumes,
access conditions at the site, distribution of traffic, types of vehicles expected, effect upon
the level of service of the street giving access to the site and neighboring streets which may
be affected, and recommended improvements to maintain the desired level of service on the
affected streets.
y. A storm water management plan, prepared by a Maine registered professional engineer in
accordance with Section 10.21. Storm Water Control.
z. A written Soil Erosion and Control Plan shall be required when:
i)
The total disturbance area is greater than 20,000 square feet per acre.
ii) For all developments that propose to remove any natural vegetation and disturb
the soil within the Royal River Corridor Overlay District.
aa. If any phasing is proposed for the project, the applicant shall provide a phasing plan that
includes the following information:
i)
A map depicting the proposed phases of the project.
ii) Approximate dates for construction start and completion for each phase of the
project.
iii) A construction management plan depicting items such as, but not limited to,
construction access, material storage and any other information that will help the
Planning Board understand the details related to the project's phased
construction.
bb. Areas within or adjacent (within 150 feet) to the proposed subdivision which have been
identified as conservation land, scenic views, and high or moderate value wildlife habitat by
the Beginning with Habitat Program and the Comprehensive Plan. The plan shall indicate
appropriate measures for the preservation of these areas in accordance with the provisions
of this Ordinance.
cc. The location and method of disposal for land clearing and construction debris.
dd. Information regarding timber harvesting as required by State Statute (See Section 5.12,19).
[Amended 06/16/12]
ee. Submissions pursuant to Section 10.4. Building Design Standards, if applicable.
ff. Any project involving structural development or soil disturbance on or adjacent to sites listed
on, or eligible to be listed on the National Register of Historic Places, as determined by the
CEO or Planning Board shall be submitted by the applicant to the Maine Historic
Preservation Commission for review and comment at least thirty (30) days prior to action
being taken by the Planning Board. The Planning Board shall consider comments received
from the Maine Historic Preservation Commission prior to rendering a decision on the
application.
SECTION 5.6 PRELIMINARY PLAN FOR MAJOR SUBDIVISION [AMENDED 6/19/21; 4/30/22; 6/17/24]
A. Procedure:
1. Within six (6) months after the site visit by the Planning Board, the applicant shall submit an
application for approval of a preliminary plan to the CEO at least thirty (30) days prior to a
scheduled meeting of the Planning Board. Failure to submit an application within 6 months shall
require resubmission of the sketch plan to the Planning Board. The preliminary plan shall
Town of North Yarmouth Land Use Ordinance
Page 49 of 292
approximate the layout shown on the Sketch Plan, plus any recommendations made by the
Planning Board.
2. Application Fee: All applications for preliminary plan approval for a Major Subdivision shall be
accompanied by a non-refundable application fee as specified in the Town of North Yarmouth
Application, License and Permit Fees Ordinance, to be paid by check to the town of North
Yarmouth stating the specific purpose of the fee. [Amended 06/12/10]
3. Technical Review: A technical review escrow is required at the time of application to cover the
cost of any contract planning services. In addition, the Planning Board may refer the developer
to a firm, or individual chosen by the Planning Board, for legal, technical, or engineering peer
review of all submissions. The developer shall pay to the town a sum that the peer reviewer shall
budget as sufficient to cover the cost of said review. If after final approval, the sum deposited with
the town was more than sufficient to cover the cost, the town shall return the unexpended funds
to the developer. If the deposit was not sufficient, the developer shall pay the balance to the town
prior to final approval by the Board.
4. The applicant, or his duly authorized representative, shall attend the meeting of the Planning
Board to present the preliminary plan application. Failure to attend the meeting to present the
preliminary plan application shall result in a delay of the Planning Board's receipt of the plan until
the next meeting that the applicant attends.
5. At the meeting at which an application for preliminary plan approval of a major subdivision is
initially present, the Planning Board shall issue a dated receipt to the applicant.
a. Require that the applicant notify the clerk and the review authority of the neighboring
municipalities if any portion of the subdivision abuts or crosses the municipal boundary, and
provide evidence that such notification was mailed.
6. If at any time, the applicant wishes to bring additional information before the Planning Board,
the supplemental information must be submitted to the CEO at least ten (10) days prior to the
Planning Board meeting, otherwise the supplemental information will not be included in Board
packets for that meeting. New or updated materials will only be allowed at the meeting at the
discretion of the Planning Board Chair.
7. Determination of a Complete Application: Within thirty (30) days of the receipt of the
preliminary plan application, the Planning Board shall determine whether the application is
complete and notify the applicant in writing of its determination. If the application is not complete,
the Planning Board shall notify the applicant of the specific additional material needed to
complete the application.
8. Public Hearing: Upon a determination that a complete application has been submitted for
review, the Planning Board may decide a public hearing is necessary. The hearing shall be held
within thirty (30) days of finding the application complete, or at the next regularly scheduled
Board meeting, after the Board's determination it has received a complete application, whichever
occurs first. The CEO will publish the notice of the date, time, and place of the hearing in a
newspaper of general circulation in the town & town website, the date of the publication to be at
least seven (7) days prior to the hearing. The applicant shall notify all property owners within
five hundred (500) ft of the parcel on which a proposed development is located at least fourteen
(14) days prior to the meeting at which the application is to be considered. The notice shall
include an accurate description of the project, date, time & location of the public hearing and
the availability of the application for review via certified mail. The Applicant must contact the
CEO for abutter list thirty (30) days prior to the meeting. Evidence of mailing shall be submitted
to the CEO prior to the hearing; provided, however that the failure of any abutting property owner
Town of North Yarmouth Land Use Ordinance
Page 50 of 292
to receive a notice of public hearing shall not necessitate another hearing, nor shall it invalidate
any decision of the Planning Board with regard to that particular application.
9. Findings of Fact and Decision: Within thirty (30) days from the public hearing or within sixty
(60) days of determining a complete application has been received, if no hearing is held, or
within another time limit as may be otherwise mutually agreed to by the Planning Board and the
applicant, the Planning Board shall make findings of fact on the application, and approve, approve
with conditions, or deny the preliminary plan application. The Planning Board shall specify in
writing its findings of facts and reasons for any conditions or denial.
10. When granting approval to a preliminary plan, the Planning Board shall state the conditions of
such approval, if any, with respect to:
a. The specific changes which it will require in the final plan;
b. The character and extent of the required improvements for which waivers may have been
requested and which the Planning Board finds may be waived without jeopardy to the public
health, safety, and general welfare; and
c. The construction items for which cost estimates and performance guarantees will be
required as prerequisite to the approval of the final plan.
11. Phased approvals. At the time the Planning Board grants final plan approval, it may permit the
plan to be divided into two or more sections subject to any conditions the Planning Board deems
necessary in order to ensure the orderly development of the Plan. If any town or quasi-municipal
department head notified of the proposed subdivision informs the Planning Board that their
department or district does not have adequate capital facilities to service the subdivision, the
Planning Board may require the plan to be divided into two or more sections subject to any
conditions the Planning Board deems necessary in order to allow the orderly planning, financing
and provision of public services to the subdivision. If the superintendent of schools indicates
that there is less than 20 percent excess classroom capacity existing in the school(s) which will
serve the subdivision, considering previously approved but not built subdivisions, the Planning
Board may require the plan to be divided into sections to prevent classroom overcrowding. If
the expansion, addition or purchase of the needed facilities is included in the town's capital
improvements program, the time period of the phasing shall be no longer than the time period
contained in the capital improvements program for the expansion, addition or purchase.
12. Approval of a preliminary plan shall not constitute approval of the final plan or intent to approve
the final plan, but rather it shall be deemed an expression of approval of the design of the
preliminary plan as a guide to the preparation of the final plan. The final plan shall be submitted
for approval by the Planning Board upon fulfillment of the requirements of these regulations and
the conditions of preliminary approval, if any. Prior to the approval of the final plan, the Planning
Board may require that additional information be submitted and changes in the plan be made as
a result of further study of the proposed subdivision or as a result of new information received.
B. Submissions: The preliminary plan application shall consist of the following items:
1. Application Form
2. Location Map: The location map shall be drawn at a size adequate to show the relationship of
the proposed subdivision to the adjacent properties, and to allow the Planning Board to locate
the subdivision within the town. The location map shall show:
a. Existing subdivisions in the proximity of the proposed subdivision.
Town of North Yarmouth Land Use Ordinance
Page 51 of 292
b. Locations and names of existing and proposed streets and roads.
c. Boundaries and designations of zoning districts.
d. An outline of the proposed subdivision and any remaining portion of the owner's property if
the preliminary plan submitted covers only a portion of the owner's entire contiguous holding.
3. Preliminary Plan: The preliminary plan shall be submitted in ten (10) copies of one or more
maps or drawings, which may be printed or reproduced on paper, with all dimensions shown
in feet or decimals of a foot. Two (2) full size plan sets measuring twenty-four (24) by thirty-six
(36) inches along with eight (8) reduced size plan sets measuring eleven (11) by seventeen (17)
inches, along with ten (10) copies of all submission materials must accompany the subdivision
application, along with one (1) electronic copy of all submission materials.
a. The plan shall be drawn to a scale of not more than one hundred (100) feet to the inch.
Plans for subdivisions containing more than one hundred (100) acres may be drawn at a
scale of not more than two hundred (200) feet to the inch provided all necessary detail can
easily be read.
b. If any part of the subdivision is located within the Groundwater Protection Overlay District,
a reduced copy of the plan and all accompanying material shall be provided to the Yarmouth
Water District no less than 7 days prior to the meeting.
4. Submission Requirements: The application for preliminary plan approval shall include the
following information. The Planning Board may require additional information to be submitted,
where it finds necessary in order to determine whether the criteria of Title 30-A M.R.S. §4404
or Section 5.12 Subdivision Review Criteria, are met.
a. Proposed name of the subdivision and the name of the town, in which it is located, plus the
Assessor's map and lot numbers.
b. Verification of right, title or interest in the property.
c. A standard boundary survey of the parcel, giving complete descriptive data by bearings and
distances, made and certified by a Maine registered land surveyor. The corners of the parcel
shall be located on the ground and marked by monuments.
d. A copy of the most recently recorded deed for the parcel. A copy of all deed restrictions,
easements, rights-of-way, or other encumbrances currently affecting the property.
e. A copy of any deed restrictions intended to cover all or part of the lots or dwellings in the
subdivision.
f.
An indication of the type of sewage disposal to be used in the subdivision.
1) When sewage disposal is to be accomplished by connection to the public sewer, a letter
from the sewer district stating that the district has the capacity to collect and treat the
wastewater shall be provided.
2) If a project requires an on-site subsurface sewage disposal system it shall be installed
in conformance with the State of Maine Subsurface Wastewater Disposal Rules (Rules).
The applicant shall submit evidence of site suitability for subsurface sewage disposal
prepared by a Maine Licensed Site Evaluator in full compliance with the requirements
of the Rules. A test pit analysis, prepared by a Maine Licensed Site Evaluator shall be
Town of North Yarmouth Land Use Ordinance
Page 52 of 292
provided. A map indicating the location of all test pits dug on the site shall also be
submitted.
g. An indication of the type of water supply system(s) to be used in the subdivision.
1) When water is to be supplied by public water supply, applicant must provide a written
statement from the Yarmouth Water District stating that adequate supply and pressure
for both domestic and fire-fighting purposes can be provided without placing an undue
burden on the source, treatment facilities, or distribution system involved. The
development shall be responsible for paying the costs of system improvements
necessary to serve the subdivision.
2) When water is supplied by a new centrally managed water system, applicant must
provide evidence of approval of the system by the Maine Drinking Water Program.
h. The date the plan was prepared, north point, and graphic map scale.
i.
The names and addresses of the record owner, applicant, and individual or company who
prepared the plan and adjoining property owners.
j.
A high intensity soil survey by a Maine certified soil scientist. Wetland areas shall be
identified on the survey, regardless of size.
k. The number of acres within the proposed subdivision, location of property lines, existing
buildings, vegetative cover type, and other essential existing physical features.
l.
The location of all rivers, streams, brooks, wetlands, vernal pools or other water bodies
within or adjacent (within 150 feet) to the proposed subdivision. When buffers are required
in accordance with Section 10.3 Brook, Pond, Vernal Pool and Wetland Buffers, the
following plan submissions shall be required:
1) The site plan shall show identified wetland types, the layout of the buffer and the
topography of the site. The extent of existing and proposed vegetation and the pre and
post development topography shall be depicted on the plan.
2) Description of the existing vegetation in the proposed buffer area.
3) If a new buffer is proposed, a description of how the buffer will be developed.
4) Description of provisions for maintenance of the buffer area including restrictions on
earth moving and vegetation clearing.
5) List of deed restrictions and covenants to be included in deed to all affected properties
or lots. A drawing with the buffer location and markers shall be attached to the deed.
6) Plat with buffer location, marker locations, maintenance provisions, and a list of deed
restrictions and/or covenants.
m. Contour lines at the interval specified by the Planning Board, showing elevations in relation
to mean sea level.
n. The zoning district in which the proposed subdivision is located and the location of any
zoning boundaries affecting the subdivision.
o. The location and size of existing and proposed sewers, water mains, culverts, and drainage
ways on or adjacent to the property to be subdivided.
p. The location, names, and present widths of existing roads, streets, highways, easements,
building lines, parks and other open spaces on or adjacent to the subdivision.
Town of North Yarmouth Land Use Ordinance
Page 53 of 292
q. The width and location of any streets, public improvements or open space shown upon the
official map and the Comprehensive Plan, if any, within the subdivision.
r. The proposed lot lines with approximate dimensions and lot areas.
s. If the proposed subdivision requires driveways or entrances onto a state or state aid
highway, a permit from the Maine Department of Transportation indicating that the driveway
or entrances conform to 23 M.R.S. § 704 and any rules adopted under that section;
t.
All parcels of land proposed to be dedicated to public use and the conditions of such
dedication.
u. The location of any open space to be preserved and a description of proposed ownership,
improvement and management. If any portion of the subdivision is located within the Royal
River Corridor Overlay District, a Royal River Corridor Management Plan that includes the
location of any building envelops, preserves natural beauty, enhances wildlife habitat and
corridors, considers public access to water bodies and inter-connected trails, and shows
how the subdivision development will contribute to the town's vision for the Royal River
Corridor as described in the town's Comprehensive Plan and the Open Space Plan.
1) Additionally, the following items must be submitted:
i. A description of all common open space and any other lands and facilities
proposed to be owned by the Town, a conservation organization, or a
homeowner's association, or that will be permanently protected by conservation
easements. This description shall include a map indicating the approximate
location of these lands and facilities.
ii. A description of proposed ownership arrangements for the parcels as identified
in Section 10.23.D.1.
iii. A description of the proposed conservation restrictions that will permanently
protect these parcels.
iv. A description of the proposed arrangements and the responsible party for the
long-term stewardship of the common open space including management
objectives and techniques for each parcel or area.
v. The area on each lot where existing forest cover will be permitted to be removed and
converted to lawn, impermeable surfaces, structures or other cover and any proposed
restrictions to be placed on clearing existing vegetation.
w. All projects shall include written certification as to the location of the 100-year floodplain
boundary to include a map of the 100-year floodplain boundary overlaid onto a U.S.G.S.
Quadrangle Map or other topographic map by a professional land surveyor, registered
professional engineer or architect. The determination shall be based on engineering
practices recognized by the Federal Emergency Management Agency (FEMA) and the
provisions of the Town's Floodplain Management Ordinance, including the most recent
FEMA maps for the Town. All proposals shall include base flood elevations, flood
boundaries, and, in a riverine 100-year floodplain, floodway data. These determinations
shall be based on engineering practices recognized by FEMA. The preliminary plan should
include a statement that building is prohibited on the 100-year floodplain, and the restriction
shall be included in any deed, lease, purchase and sale agreement, or document
transferring or expressing intent to transfer any interest in real estate or structure.
x. A hydrogeologic assessment prepared by a Maine certified geologist or Maine registered
Town of North Yarmouth Land Use Ordinance
Page 54 of 292
professional engineer, experienced in hydrogeology, when the subdivision is not served by
public sewer and any part of the subdivision is located within the Groundwater Protection
Overlay District or the subdivision has an average density of more than one dwelling unit
per 100,000 square feet. The Planning Board may require a hydrogeologic assessment in
other cases where site considerations or development design indicate potential of adverse
impacts on ground water quality. These cases include extensive areas of shallow to bedrock
soils; or cluster developments in which the average density is less than one dwelling unit
per 100,000 square feet but the density of the developed portion is in excess of one dwelling
unit per 80,000 square feet; or proposed use of shared or common subsurface wastewater
disposal systems. The hydrogeologic assessment shall be conducted in accordance with the
provisions of Section 10.24 Water Quality.
y. An estimate of the amount and type of vehicular traffic to be generated on a daily basis and
at peak hours. Trip generation rates used shall be taken from the Trip Generation Manual,
1991 edition, or most recent edition, published by the Institute of Transportation Engineers.
Trip generation rates from other sources may be used if the applicant demonstrates these
sources better reflect local conditions, and if approved by the Planning Board.
z. Areas within or adjacent (within 150 feet) to the proposed subdivision which have been
identified as conservation land, scenic views, and high or moderate value wildlife habitat by
the Beginning with Habitat Program and the Comprehensive Plan. The plan shall indicate
appropriate measures for the preservation of these areas in accordance with the provisions
of this Ordinance.
aa. Information regarding timber harvesting as required by State Statute (See Section 512,19).
[Amended 06/16/12]
bb. Any project involving structural development or soil disturbance on or adjacent to sites listed
on, or eligible to be listed on the National Register of Historic Places, as determined by the
CEO or Planning Board shall be submitted by the applicant to the Maine Historic
Preservation Commission for review and comment at least thirty (30) days prior to action
being taken by the Planning Board. The Planning Board shall consider comments received
from the Maine Historic Preservation Commission prior to rendering a decision on the
application.
SECTION 5.7 FINAL PLAN FOR MAJOR SUBDIVISION [AMENDED 6/19/21;4/30/22; 6/17/24]
A. Procedure.
1. Within six (6) months after the approval of the preliminary plan, the applicant shall submit an
application for approval of the final plan at least thirty (30) days prior to a scheduled meeting of
the Planning Board. Applications shall be submitted to the Planning Board in care of the CEO.
If the application for the final plan is not submitted within six (6) months after preliminary plan
approval, the Planning Board shall require resubmission of the preliminary plan, except as
stipulated below. The final plan shall approximate the layout shown on the preliminary plan, plus
any changes required by the Planning Board.
2. If an applicant cannot submit the final plan within 6 months, due to delays caused by other
regulatory bodies, or other reasons, the applicant may request an extension. Such a request for
an extension to the filing deadline shall be filed, in writing, with the Planning Board prior to the
expiration of the filing period. The request for an extension shall state the reason for the delay
and set forth a timetable for final plan submission. In considering the request for an extension
the Planning Board shall make findings that the applicant has made due progress in preparation
Town of North Yarmouth Land Use Ordinance
Page 55 of 292
of the final plan and in pursuing approval of the plans before other agencies, and that town
ordinances or regulations which may impact on the proposed development have not been
amended.
3. Other Approvals: Prior to submittal of the final plan application, the following approvals shall
be obtained in writing, where applicable:
a. Maine Department of Environmental Protection, under the Site Location of Development
Act, Natural Resources Protection Act, or if a wastewater discharge license is needed.
b. Maine Department of Human Services, if the applicant proposes to provide a centrally
managed water system.
c. Maine Department of Human Services, if an engineered subsurface wastewater
disposal system(s) or advanced waste water treatment system is to be utilized.
d. U.S. Army Corps of Engineers, if a permit under Section 404 of the Clean Water Act is
required.
e. Maine State Fire Marshall's Office, as appropriate.
f.
Any other approvals required by local, state or federal law.
4. The applicant, or his duly authorized representative, shall attend the meeting of the Planning
Board to discuss the final plan. At the meeting at which an application for final plan approval of
a major subdivision is initially presented, the Planning Board shall issue a dated receipt to the
applicant.
5. Determination of a Complete Application: Within thirty (30) days of the receipt of the final
plan application, the Planning Board shall determine whether the application is complete and
notify the applicant in writing of its determination. If the application is not complete, the Board
shall notify the applicant of the specific additional material needed to complete the application.
6. Public Hearing: Upon a determination that a complete application has been submitted for
review, the Planning Board may decide a public hearing is necessary. The hearing shall be held
within thirty (30) days of finding the application complete, or at the next regularly scheduled
Board meeting, after the Board's determination it has received a complete application, whichever
occurs first. The CEO will publish the notice of the date, time, and place of the hearing in a
newspaper of general circulation in the town & town website, the date of the publication to be at
least seven (7) days prior to the hearing. The applicant shall notify all property owners within
five hundred (500) ft of the parcel on which a proposed development is located at least fourteen
(14) days prior to the meeting at which the application is to be considered. The notice shall
include an accurate description of the project, date, time & location of the public hearing and
the availability of the application for review via certified mail. The Applicant must contact the
CEO for abutter list thirty (30) days prior to the meeting. Evidence of mailing shall be submitted
to the CEO prior to the hearing; provided, however that the failure of any abutting property owner
to receive a notice of public hearing shall not necessitate another hearing, nor shall it invalidate
any decision of the Planning Board with regard to that particular application.
7. Before the Planning Board grants approval of the final plan, the applicant shall meet the
performance guarantee requirements contained in Section 3.8 Performance Guarantees.
8. Findings of Fact and Decision: Within thirty (30) days from the public hearing or within sixty
(60) days of receiving a complete application, if no hearing is held, or within another time limit
Town of North Yarmouth Land Use Ordinance
Page 56 of 292
as may be otherwise mutually agreed to by the Planning Board and the applicant, the Planning
Board shall make findings of fact, and conclusions relative to the criteria for approval contained
in Title 30-A M.R.S. Section 4404, Section 5.12 Subdivision Review Criteria, and the standards
of this Ordinance. If the Planning Board finds that all the criteria of the statute and the standards
of this Ordinance have been met, they shall approve the final plan. If the Planning Board finds
that any of the criteria of the statute or the standards of this Ordinance have not been met, the
Planning Board shall either deny the application or approve the application with conditions to
ensure all of the standards will be met by the subdivision. The reasons for any conditions shall
be stated in the records of the Planning Board.
B. Submissions: The Final Plan application shall consist of the following.
1. Completed application form, along with 10 copies of all submission materials, must
accompany the subdivision application, plus an electronic copy of all submission materials.
2. Final Plan: The Final Plan shall be submitted in ten (10) copies of one or more maps or
drawings, which may be printed or reproduced on paper, with all dimensions shown in feet
or decimals of a foot. Two (2) full size plan sets measuring twenty-four (24) by thirty-six (36)
inches along with eight (8) reduced size plan sets measuring eleven (11) by seventeen (17)
inches. Along with ten (10) paper copies of all required submission materials below, along
with one (1) electronic copy of all submission materials.
a. The final plan set must show all of the information presented on the Preliminary Plan
and any amendments thereto suggested or required by the Board.
b. The plan shall be drawn to a scale of not more than one hundred (100) feet to the inch.
Plans for subdivisions containing more than one hundred (100) acres may be drawn
at a scale of not more than two hundred (200) feet to the inch provided all necessary
detail can easily be read.
c. If any part of the subdivision is located within the Groundwater Protection Overlay
District, a reduced copy of the plan and all accompanying material shall be provided
to the Yarmouth Water District no less than 7 days prior to the meeting.
C. Submission Requirements: The application for approval of a Final Subdivision shall include the
following information. The Planning Board may require additional information to be submitted,
where it finds necessary in order to determine whether the criteria of Title 30-A M.R.S §4404 or
Section 5.12 Subdivision Review Criteria, are met.
1. Copies of any approval from outside agencies per section 5.7.A.3.
2. All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Written offers to convey title to the town of all public ways and open spaces
shown on the Plan, and copies of agreements or other documents, such as homeowner's
association bylaws, showing the manner in which open spaces and/or facilities to be retained
by the developer or lot owners are to be maintained shall be submitted. If any of the open
space and/or facilities are to be reserved by the individual unit owners as common open
space, the developer shall be required prior to final subdivision plan approval to incorporate
a homeowners' association consisting of the individual unit owners, which incorporation must
comply with Section 11.09 Homeowner/Property Owners' Associations. The Planning Board
may require written evidence from an attorney that the required documents are legally
sufficient to preserve and maintain common open space, recreation land and other common
facilities. If proposed streets and/or open spaces or other land is to be offered to the town,
written evidence that the Select Board are satisfied with the legal sufficiency of the written
Town of North Yarmouth Land Use Ordinance
Page 57 of 292
offer to convey title shall be included.
3. A list of construction items along with cost estimates for all off-site and the following on-site
improvements, that will be completed by the applicant prior to the sale of lots, and evidence
that the applicant has financial commitments or resources to cover these costs.
a. Site preparation, including but not limited to clearing, grading, excavation, or blasting.
b. Any public or private streets and associated sidewalks and any sidewalks providing
access to the site from existing public or private streets.
c. Lighting, landscaping, public amenities and utilities in all street rights-of-way and all
common areas.
d. Other public or common area improvements such as recreation or open space
elements.
4. If any phasing is proposed for the project, the applicant shall provide a phasing plan that
includes the following information:
a. A map depicting the proposed phases of the project.
b. Approximate dates for construction start and completion for each phase of the project.
c. A construction management plan depicting items such as, but not limited to,
construction access, material storage and any other information that will help the
Planning Board understand the details related to the project's phased construction.
SECTION 5.8 FINAL APPROVAL AND FILING FOR MINOR AND MAJOR SUBDIVISIONS [AMENDED
6/19/21; 6/17/24]
A. No plan shall be approved by the Planning Board as long as the applicant, or any entity in which
the applicant has a legal or financial interest, is in violation of the provisions of a previously approved
Plan within the town.
B. Upon findings of fact and determination that all standards in Title 30-A M.R.S. Section 4404 Review
Criteria, Section 5.12. Subdivision Review Criteria, and these regulations have been met, and upon
voting to approve the subdivision, the Planning Board shall sign the final plan. The Planning Board
shall specify in writing its findings of facts and reasons for any conditions or denial. The town shall
retain one copy of the signed plan as part of its permanent records. Any subdivision not recorded
in the Cumberland County Registry of Deeds within 90 days of the date upon which the plan is
approved and signed by the Planning Board shall become null and void.
C. Phased approvals.
a. Final Plan approval will be limited to the first phase of the subdivision, with Preliminary Plan
approval remaining for subsequent phases. The applicant must receive Final Approval for
subsequent phases prior to permits or construction activities in any phases.
b. Construction activities must proceed in conformance with the approved phasing plan. No
construction activities may commence on a phase until prior phases of the plan are complete.
c. Performance guarantees associated with each phase must be received by the Town prior to
construction work associated with that phase.
D. Two (2) full sized paper copies of the approved subdivision plan shall be signed by the Planning
Board, one to be recorded at the Cumberland County Registry of Deeds and one for town records.
Both plans shall be embossed with the seal of the individual responsible for preparation of the plan.
E. No changes, erasures, modifications, or revisions shall be made in any final plan after approval has
been given by the Planning Board and endorsed in writing on the plan, unless the revised final plan
is first submitted and the Planning Board approves any modifications, except in accordance with
Section 5.9 Revisions to Approved Plans for Minor and Major Plans. The Planning Board shall make
findings that the revised plan meets the criteria of Title 30-A M.R.S., Section 4404, and Section 5.12
Town of North Yarmouth Land Use Ordinance
Page 58 of 292
Subdivision Review Criteria, and the other standards of these regulations. In the event that a plan
is recorded without complying with this requirement, it shall be considered null and void, and the
Planning Board shall institute proceedings to have the plan stricken from the records of the
Cumberland County Registry of Deeds.
F. The approval by the Planning Board of a subdivision plan shall not be deemed to constitute or be
evidence of any acceptance by the town of any street, easement, or other open space shown on
such plan. When a park, playground, or other recreation area shall have been shown on the plan to
be dedicated to the town, approval of the plan shall not constitute an acceptance by the town of such
areas. The Planning Board shall require the plan to contain appropriate notes to this effect. The
Planning Board may also require the filing of a written agreement between the applicant and the
Select Board covering future deed and title dedication, and provision for the cost of grading,
development, equipment, and maintenance of any such dedicated area.
G. Except in the case of a phased development plan, failure to complete substantial construction of
the subdivision within 5 years of the date of approval and signing of the plan shall render the plan
null and void. Upon determining that a subdivision's approval has expired under this paragraph, the
Planning Board shall have a notice placed in the Cumberland County Registry of Deeds to that
effect.
SECTION 5.9 REVISIONS TO APPROVED PLANS FOR MINOR AND MAJOR SUBDIVISIONS
[REVISED 4/30/22; 6/17/24]
A. Procedure: An applicant for a revision to a previously approved plan shall, at least thirty (30) days
prior to a scheduled meeting of the Planning Board, request to be placed on the Planning Board's
agenda. If the revision involves abandonment of the subdivision or the creation of additional lots or
dwelling units, the procedures for preliminary plan approval shall be followed. If the revision involves
only modifications of the approved plan, without the creation of additional lots or dwelling units, the
procedures for final plan approval shall be followed. [Amended 6/18/11]
B. Submissions: The applicant shall submit a copy of the approved plan as well as ten (10) copies of
the proposed revisions. The application shall also include enough supporting information to allow the
Planning Board to make a determination that the proposed revisions meet the standards of these
regulations and the criteria of the statute. The Planning Board is authorized to decide whether it
has received adequate supporting information to make this decision. The revised plan shall indicate
that it is the revision of a previously approved and recorded plan and shall show the title of the
subdivision and the book and page or cabinet and sheet on which the original plan is recorded at
the Cumberland County Registry of Deeds.
C. Scope of Review: The Planning Board's scope of review shall be limited to those portions of the
plan that are proposed to be changed.
D. Technical Review: A technical review escrow is required at the time of application to cover the cost
of any contract planning services. In addition, the Planning Board may refer the developer to a firm
or individual chosen by the Planning Board for legal, technical, or engineering peer review of all
submissions. The developer shall pay to the town a sum that the peer reviewer shall budget as
sufficient to cover the cost of said review. If after final approval, the sum deposited with the town was
more than sufficient to cover the cost, the town shall return the unexpended funds to the developer.
If the deposit was not sufficient, the developer shall pay the balance to the town prior to final approval
by the Board.
SECTION 5.10 INSPECTIONS AND ENFORCEMENT [AMENDED 6/19/21]
Town of North Yarmouth Land Use Ordinance
Page 59 of 292
A. Inspection of Required Improvements.
1. At least five (5) days prior to commencing construction of required improvements, the developer
shall:
a. Notify the CEO in writing of the time when (s)he proposes to commence construction
of such improvements, so that the CEO can arrange for inspections to assure that all
town specifications, requirements, and conditions of approval are met during the
construction of required improvements, and to assure the satisfactory completion of
improvements and utilities required by the Planning Board.
b. Deposit with the Select Board a check made out to the town of North Yarmouth for the
amount recommended by the Town Engineer. These funds shall be used by the town to
hire the services of a Maine registered professional engineer to review the specifications
for all improvements, and to inspect the construction, including, but not limited to: roads,
streets, lighting, sidewalks, storm water facilities, water lines, sewer lines, etc. and all
conditions of final approval. If these funds are sufficient to cover the cost of said review
and inspection, the remaining funds shall be returned to the developer after satisfactory
completion of the improvements, including cleanup. If the funds are not enough to cover
said review and inspection, the developer shall submit additional funds to the Town to
cover additional inspection escrow.
2. If the inspecting official finds upon inspection of the improvements that any of the required
/improvements have not been constructed in accordance with the plans and specifications filed
by the developer, he shall so report in writing to the CEO and the developer. The town shall
take any steps necessary to assure compliance with the approved plans.
3. If at any time it appears necessary or desirable to modify the required improvements before or
during the construction of the required improvements, the inspecting official is authorized to
approve minor modifications due to unforeseen circumstances such as encountering hidden
outcrops of bedrock, natural springs, etc. The inspecting official shall issue any approval under
this section in writing and shall transmit a copy of the approval to the CEO and the Planning
Board. Revised plans shall be filed with the Planning Board. For major modifications, such as
relocation of rights-of-way, property boundaries, changes of grade by more than 1 percent, etc.,
the subdivider shall obtain permission from the Planning Board to modify the plans.
4. At the close of each summer construction season in which the development has occurred, the
town shall, at the expense of the developer, have the site inspected by a qualified individual. By
October 1 of each year during which construction was done on the site, the inspector shall submit
a report to the CEO and the Planning Board based on that inspection, addressing whether storm
water and erosion control measures (both temporary and permanent) are in place, are properly
installed, and appear adequate. The report shall also include a discussion and
recommendations on any problems that were encountered.
5. Prior to the sale of any lot, the developer shall provide the Planning Board with a letter from a
Maine registered land surveyor, stating that all monumentation shown on the plan has been
installed.
6. Upon completion of road construction and prior to acceptance of the road by the town, (town's
Roadway Ordinance), a written certification signed by a Maine registered professional engineer
shall be submitted to the Town Manager for Select Board review at the expense of the applicant,
certifying that the proposed street meets or exceeds the design and construction requirements
of the town's Roadway Ordinance. If there are any underground utilities, the servicing utility
shall certify in writing that they have been installed in a manner acceptable to the utility. "As
Town of North Yarmouth Land Use Ordinance
Page 60 of 292
built" plans shall be submitted to the Select Board.
7. The developer shall be required to maintain all improvements and provide for snow removal on
streets and sidewalks until acceptance of the improvements by the town or control is placed with
a lot owners' association.
B. Violations and Enforcement:
1. No plan of a division of land within the town, which would constitute a subdivision, shall be
recorded in the Cumberland County Registry of Deeds until a final plan has been approved by
the Planning Board in accordance with these regulations.
2. A person shall not convey, offer or agree to convey any land in a subdivision, which has not
been approved by the Planning Board and recorded in the Cumberland County Registry of
Deeds.
3. A person shall not sell, lease or otherwise convey any land in an approved subdivision, which
is not shown, on the plan as a separate lot.
4. No public utility, water district, sanitary district or any utility company of any kind shall serve any
lot in a subdivision for which a final plan has not been approved by the Planning Board.
5. Development of a subdivision without Planning Board approval shall be a violation of law.
Development includes: cutting of trees, grading or construction of roads; grading of land or lots;
or construction of buildings; which require a plan, approved as provided in these regulations and
recorded in the Cumberland County Registry of Deeds.
6. No lot in a subdivision may be sold, leased, or otherwise conveyed before the road or street
upon which the lot fronts is completed in accordance with these regulations up to and including
the entire frontage of the lot.
7. Violations of the above provisions of this section are a nuisance and shall be punished in
accordance with the provisions of Title 30-A M.R.S., Section 4452, and any other appropriate
statutes.
SECTION 5.11 SUBDIVISION REVIEW CRITERIA [AMENDED 6/17/24]
A. Findings of Fact Required: Pursuant to Title 30-A M.R.S., Sections 4404 Review Criteria, the
Planning Board must make "findings of fact" regarding each of the following criteria before
approving a subdivision.
B. Review Criteria: The Planning Board shall consider the following criteria and, before granting
approval, must determine that:
1. Pollution: The proposed subdivision will not result in undue water or air pollution. In making
this determination, the Planning Board shall at least consider:
a. The elevation of land above sea level and its relation to the flood plains;
b. The nature of soils and subsoils and their ability to adequately support waste disposal;
c. The slope of the land and its effect on effluents;
d. The availability of streams for disposal of effluents; and
e. The applicable state and local health and water resource rules, regulations and/or statutes.
Town of North Yarmouth Land Use Ordinance
Page 61 of 292
2. Sufficient Water: The proposed subdivision has sufficient water available for the
reasonably foreseeable needs of the development;
3. Municipal Water Supply: The proposed subdivision will not cause an unreasonable burden on
the public water supplies of the Yarmouth Water District, if they are to be used;
4. Erosion: The proposed development will not cause unreasonable soil erosion or a reduction in
the capacity of the land, both on-site and off-site, to hold water so that a dangerous or unhealthy
condition results;
5. Traffic: The proposed subdivision will not cause unreasonable highway or public road
congestion or unsafe conditions with respect to the use of the highways or public roads existing
or proposed and, if the proposed subdivision requires driveways or entrances onto a state or
state aid highway, the Department of Transportation has provided documentation indicating that
the driveway or road entrances conform to 23 M.R.S. § 704 and any rules adopted under that
section;
6. Sewage Disposal: The proposed subdivision will provide for adequate sewage waste disposal
and will not cause an unreasonable burden on municipal services if they are utilized;
7. Municipal Solid Waste Disposal: The proposed subdivision will not cause an
unreasonable burden on the town's ability to dispose of solid waste, if town services are to be
utilized;
8. Aesthetic, Cultural and Natural Values: The proposed subdivision will not have an undue
adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites, significant
plant or animal habitat identified by the Department of Inland Fisheries and Wildlife, U.S. Fish and
Wildlife Service, Maine Natural Areas Program, Beginning with Habitat Program or the town, or
rare and irreplaceable natural areas or any public rights for physical or visual access to the
shoreline;
9. Conformity with Local Ordinances and Plans: The proposed subdivision conforms to the
provisions of this Ordinance and the town's Comprehensive Plan, including the Open Space
Plan. In making this determination, the Planning Board may interpret these ordinances and plans;
10. Financial and Technical Capacity: The developer has adequate financial and technical
capacity to meet the standards of this Ordinance;
11. Surface Waters: Whenever situated within 250 feet of the Deer Brook wetland, Knight's Pond,
the Royal River, Chandler Brook, and the East Branch, and whenever situated with 150 feet of
Toddy Brook, Pratt's Brook, Deer Brook and an un-named tributary to Chandler Brook, the
proposed subdivision will not adversely affect the quality of that body of water or unreasonably
affect the shoreline of that body of water.
12. Groundwater: The proposed subdivision will not, alone or in conjunction with existing activities,
adversely affect the quality or quantity of ground water on site or on adjacent properties, and in
particular the quality and quantity of ground water within the Groundwater Protection Overlay
District;
13. Flood areas: Based on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps for North Yarmouth, and information presented
by the applicant whether the subdivision is in a flood-prone area. If the subdivision, or any part
of it, is in such an area, the subdivider shall determine the 100-year flood elevation and flood
Town of North Yarmouth Land Use Ordinance
Page 62 of 292
hazard boundaries within the subdivision. The proposed subdivision plan must include a
condition of plan approval requiring that principal structures in the subdivision shall not be
constructed within the 100-year floodplain;
14. Wetlands: All wetlands, including vernal pools, within the proposed subdivision have been
identified on any maps submitted as part of the application, regardless of the size of these
wetlands. Any mapping of wetlands may be done with the help of the local soil and water
conservation district. Wetlands shall be identified in accordance with the 1987 Corps of
Engineers Wetland Delineation Manual (or most recent edition), published by the United States
Army Corps of Engineers;
15. Farmland: All farmland within the proposed subdivision has been identified on maps submitted
as part of the application. Any mapping of farmland may be done with the help of the
Cumberland County Soil & Water District.
16. River, Stream or Brook: Any river, stream or brook within or abutting the proposed subdivision
has been identified on any maps submitted as part of the application.
17. Storm Water: The proposed subdivision will provide for adequate storm water management;
18. Impact on Adjoining Municipality: For any proposed subdivision that crosses municipal
boundaries, the proposed subdivision will not cause unreasonable traffic congestion or unsafe
conditions with respect to the use of existing public ways in an adjoining municipality in which
part of the subdivision is located.
19. Lands Subject to Liquidation Harvesting: Timber on the parcel being subdivided has not
been harvested in violation of rules adopted pursuant to M.R.S. Title 12, Section 8869,
subsection 14. If a violation of rules adopted by the Maine Forest Service to substantially
eliminate liquidation harvesting has occurred, the Planning Board must determine prior to
granting approval for the subdivision that 5 years have elapsed from the date the landowner
(i.e., one person or a group of persons in common or joint ownership) under whose ownership
the harvest occurred acquired the parcel. The Planning Board may request technical assistance
from the Maine Department of Conservation, Bureau of Forestry to determine whether a rule
violation has occurred, or the municipal reviewing authority may accept a determination certified
by a forester licensed pursuant to M.R.S. Title 32, chapter 76. If the Planning Board requests
technical assistance from the bureau, the bureau shall respond within 5 working days regarding
its ability to provide assistance. If the bureau agrees to provide assistance, it shall make a finding
and determination as to whether a rule violation has occurred. The bureau shall provide a written
copy of its finding and determination to the Planning Board within 30 days of receipt of the
Planning Board's request. If the bureau notifies the Planning Board that the bureau will not
provide assistance, the Planning Board may require a subdivision applicant to provide a
determination certified by a licensed forester.
For the purposes of this subsection, "liquidation harvesting" has the same meaning as in
M.R.S. Title 12, section 8868,1 subsection 6 and "parcel" means a contiguous area within the
town of North Yarmouth owned by one person or a group of persons in common or joint
ownership. This subsection takes effect on the effective date of rules adopted pursuant to
M.R.S. Title 12, section 8869, subsection 14.'
Town of North Yarmouth Land Use Ordinance
Page 63 of 292
1 Liquidation harvesting means the purchase of timberland followed by a harvest that removes most or all commercial value in standing timber,
without regard for long-term forest management principles, and the subsequent sale or attempted resale of the harvested land within 5 years
(MRSA Title 12 Section 8868, subsection 6)
Questions to assess Subdivision
Review Criterion 19 concerning
subdivision of liquidated forestland.
Yes/
No
Optional Additional
Data
Action
1. Has the parcel changed ownership
within 5 years prior to the date of the
subdivision application?
Date of last
conveyance:
"No" - end of Criterion 19
review
"Yes" - Proceed to 2
2. Has timber been harvested on the
parcel within 5 years prior to the date
of the subdivision application.
Indicate date of last
timber harvest:
"No" - end of Criterion 19
review
"Yes" - Proceed to
question 3
3. Did the timber harvesting result in a
rule violation (pursuant to Title 12,
section 8869, subsection 14) based on
a request for technical assistance from
the Department of Conservation,
Bureau of Forestry?
If Bureau has not agreed to provide
assistance proceed to next question.
Date request
forwarded to the
Maine Forest Service
(MFS):
Date MFS indicated
ability to provide
technical assistance:
"No" - end of Criterion 19
review
"Yes" - Deny Subdivision
4. Has a violation occurred based on a
determination that is certified by a
forester licensed pursuant to Title 32,
chapter 76? Note: Applicant to obtain
this information and provide to the
town.
Date of determination
by MFS or forester
licensed pursuant to
Title 32, chapter 76:
"No" - end of Criterion 19
review
"Yes" - Deny Subdivision
The following table is designed to assist the Planning Board in making a determination regarding this criterion.
Town of North Yarmouth Land Use Ordinance
Page 64 of 292
VI.
VARIANCES AND APPEALS
SECTION 6.1 APPOINTMENT AND COMPOSITION [AMENDED 6/19/21]
There shall be a Zoning Board of Appeals (ZBA) consisting of five (5) voting members and two (2)
alternate members appointed by the Select Board with staggered five (5) year terms. Voting members
shall elect a Chairman and Secretary from its membership. An alternate may vote only in the absence
of a regular member. The ZBA must be maintained in accordance with the provisions of Title 30-A
M.R.S. Section 2691, Board of Appeals.
SECTION 6.2 POWERS AND DUTIES OF THE ZONING BOARD OF APPEALS (ZBA). [AMENDED
5/17/08]
The Zoning Board of Appeals (ZBA) shall conduct of its affairs in accordance with the provisions of this
Ordinance and Title 30-A, Section 2691, Board of Appeals, and Section 4353, Zoning Adjustment. The
ZBA shall have the following powers:
A. Administrative Appeals: To hear and decide administrative appeals, on an appellate basis, where
it is alleged by an aggrieved party that there is an error in any order, requirement, decision, or
determination made by, or failure to act by, the Planning Board in the administration of this
Ordinance; and to hear and decide administrative appeals on a de novo basis where it is alleged by
an aggrieved party that there is an error in any order, requirement, decision or determination made
by, or failure to act by, the Code Enforcement Officer in his or her review of and action on a permit
application under this Ordinance. Any order, requirement, decision or determination made, or failure
to act, in the enforcement of this Ordinance is not appealable to the Board of Appeals.
B. Variances: To grant variances from the terms of this Ordinance provided that there is no substantial
departure from the intent of this Ordinance, and that a literal enforcement of the Ordinance would
cause undue hardship as defined by 30-A M.R.S. Sec. 4353, Zoning Adjustment. The Board shall
limit any variances granted as strictly as possible in order to preserve the terms of the Ordinance and
it may impose such conditions, as it deems necessary, to that end.
C. Miscellaneous Appeals: To hear and decide only the following miscellaneous appeals from the
provisions of this Ordinance. In granting, by majority vote, any such miscellaneous appeals, the
ZBA may prescribe conditions and safeguards as are appropriate under this Ordinance.
1. To interpret District boundaries as prescribed in Section VII. Zoning District Regulations of
this Ordinance.
2. To permit variations of non-conformance as prescribed in Section II. Non-conformance of
this Ordinance.
SECTION 6.3 ADMINISTRATIVE APPEALS, VARIANCES AND MISCELLANEOUS APPEALS
[AMENDED 6/12/10; 6/19/21, 11/08/22]
A. Procedures:
1. Time Limit: An administrative, variance or miscellaneous appeal may be taken to the Zoning
Board of Appeals (ZBA) by an aggrieved party from any decision of the Code Enforcement
Officer (CEO) or the Planning Board. Such an appeal shall be taken within thirty (30) days of the
date of the official written decision appealed from, and not otherwise, except that the ZBA, upon
a showing of good cause, may waive the thirty (30) day requirement.
Town of North Yarmouth Land Use Ordinance
Page 65 of 292
2. Submission for an Appeal:
a. Applications for appeals shall be made by filing with the CEO eleven (11) copies of written
notice of appeal that includes:
1) A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
2) A sketch drawn to scale showing lot lines, location of existing buildings and structures
and other physical features of the lot pertinent to the relief sought.
3) The appeal fee to cover the notification requirements.
b. No appeal shall be placed on the agenda for ZBA consideration or action until the CEO
makes a finding that the application is complete. All appeals shall require a public hearing.
3. Records to be Forwarded to the Zoning Board of Appeals: Upon receiving an application
for an administrative appeal or a variance, the CEO or Planning Board, as appropriate, shall
transmit to the ZBA all of the papers constituting the record of the decision appealed from.
4. Public Hearing: The Zoning Board of Appeals (ZBA) shall hold a public hearing on an
administrative appeal or a request for a variance within 35 days of a complete written
application, unless this time period is extended by the parties. The public hearing shall be
conducted in accordance with the procedure set forth in 30-A M.R.S., Section 2691, Board of
Appeals. The CEO, Planning Board and Select Board may be parties to the hearing. Notification
of all appeals shall be given to the Planning Board, if applicable, and abutting property owners
indicating the nature of the appeal and the time and place of the public hearing. Failure of any
property owner to receive a notice shall not invalidate any action of the ZBA.
5. Administrative Appeals:
a. When the ZBA reviews a decision of the Code Enforcement Officer the Board of Appeals
shall hold a "de novo" hearing. At this time the Board may receive and consider new evidence
and testimony, be it oral or written. When acting in a "de novo" capacity the ZBA shall hear
and decide the matter afresh, undertaking its own independent analysis of evidence and the
law, and reaching its own decision.
b. When the ZBA hears a decision of the Planning Board, it shall hold an appellate hearing,
and may reverse the decision of the Planning Board only upon finding that the decision was
contrary to specific provisions of the Ordinance or contrary to the facts presented to the
Planning Board. The ZBA may only review the record of the proceedings before the Planning
Board. The ZBA shall not receive or consider any evidence which was not presented to the
Planning Board, but the ZBA may receive and consider written or oral arguments. If the ZBA
determines that the record of the Planning Board proceedings are inadequate, the ZBA may
remand the matter to the Planning Board for additional fact finding.
6. Decision by Zoning Board of Appeals (ZBA):
a. Quorum: A majority of the full voting membership of the ZBA shall constitute a quorum for
the purpose of deciding an appeal.
b. Burden of Proof: The person filing the appeal shall have the burden of proof.
c.
c. Action on Appeal: Following the public hearing on an appeal, the ZBA may affirm, affirm
Town of North Yarmouth Land Use Ordinance
Page 66 of 292
with conditions, or reverse the decision of the CEO or Planning Board. The ZBA may reverse
the decision, or failure to act, of the CEO or Planning Board only upon a finding that the
decision, or failure to act, was clearly contrary to specific provisions of this Ordinance. When
errors of administrative procedures or interpretations are found, the case shall be remanded
back to the CEO or the Planning Board for correction.
d. Time Frame: The ZBA shall decide all administrative appeals and variance appeals within
35 days after the close of the hearing, and shall issue a written decision on all appeals.
e. Statement of Findings: The ZBA shall state the reasons and basis for its decision,
including a statement of the facts found and conclusions reached by the Board. The ZBA
shall cause written notice of its decision to be mailed or hand-delivered to the applicant, and
to the Department of Environmental Protection for appeals applicable to the Resource
Protection and Residential Shoreland Districts, within 7 days of the Board's decision. Copies
of written decisions of the ZBA shall be given to the Planning Board, Code Enforcement
Officer, and the Select Board.
7. Appeal to Superior Court: Except as provided by 30-A M.R.S. Section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the ZBA may take
an appeal to Superior Court in accordance with State laws within forty-five (45) days from the
date of the vote on the original decision of the ZBA.
8. Reconsideration: In accordance with 30-A M.R.S. Section 2691(3)(F), the ZBA may reconsider
any decision reached under this section within forty-five (45) days of its prior decision. A request
to the ZBA to reconsider a decision must be filed within 10 days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and
be completed within forty-five (45) of the date of the vote on the original decision. Reconsideration
of a decision shall require a positive vote of the majority of the ZBA members originally voting
on the decision, and proper notification to the landowners, petitioner, Planning Board, CEO, and
other parties of interest, including abutters and those who testified at the original hearing(s).
The ZBA may conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within 15 days after the
decision on reconsideration.
B. Variance Appeals: The Zoning Board of Appeals (ZBA) shall limit any variances granted as strictly
as possible in order to ensure conformance with the purposes and provisions of this Ordinance to
the greatest extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed. Variances
may be granted only under the following conditions:
1. Variances may be permitted only under the following conditions:
a. Variances may be granted only from dimensional requirements including, but not limited
to street frontage, lot width, structure height, percent of lot coverage, and setback
requirements.
b. Variances shall not be granted for establishment of any uses otherwise prohibited by
this Ordinance.
c. The Board shall not grant a variance unless it finds that:
1) The proposed structure or use would meet the provisions of this Ordinance, except for
the specific provision which has created the non-conformity and from which relief is
sought; and
2) The strict application of the terms of this Ordinance would result in undue hardship.
Town of North Yarmouth Land Use Ordinance
Page 67 of 292
The term "undue hardship" shall mean:
(a) That the land in question cannot yield a reasonable return unless a variance is
granted;
(b) That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
(c) That the granting of a variance will not alter the essential character of the locality;
and
(d) That the hardship is not the result of action taken by the applicant or a prior owner.
2. Setback Variance for a Detached Single-Family Dwelling: Notwithstanding subsection
B.1. c.2. above, the ZBA may grant a setback variance for a detached single-family dwelling
when strict application of this Ordinance to the applicant and the applicant's property would
cause undue hardship. The term "undue hardship" as used in this subsection means:
a. The need for a variance is due to the unique circumstances of the property and not to
the general conditions of the neighborhood;
b. The granting of a variance will not alter the essential character of the locality;
c. The hardship is not the result of action taken by the applicant or a prior owner;
d. The granting of the variance will not substantially reduce or impair the use of abutting
property; and
e. The granting of a variance is based upon demonstrated need, not convenience, and no
other feasible alternative is available.
Under this subsection, the ZBA may only grant a variance from a setback requirement for a
single family dwelling that is the primary year-round residence of the applicant. A variance
under this subsection may not exceed 20 percent of a set-back requirement and may not be
granted if the variance would cause the area of the dwelling to exceed the maximum
permissible lot coverage, provided, however, a variance under this subsection may exceed 20
percent of set-back requirement, except for maximum setbacks from a wetland or water body
required within the Residential Shoreland District and the Resource Protection District
pursuant to Section 9.1. Residential Shoreland District and the Resource Protection District
Performance Standards (subsection G. Principal and Accessory Structures), if the applicant
has obtained the written consent of an affected abutting landowner.
3. Disability Variance: Notwithstanding subsection B.1.c.1). above, the ZBA may grant a variance
to an owner of a residential dwelling for the purpose of making that dwelling accessible to a
person with a disability who resides in or regularly uses the dwelling. The ZBA shall restrict any
variance granted under this subsection solely to the installation of equipment or the construction
of structures necessary for access to or egress from the dwelling by the person with the disability.
The ZBA may impose conditions on the variance, including limiting the variance to the duration
of the disability or to the time that the person with the disability lives in the dwelling. For the
purposes of this subsection, a disability has the same meaning as a "physical or mental
disability" under 5 M.R.S. § 4553(7-A), and the term "structures necessary for access to or
egress from the dwelling" shall include railing, ramps, wall or roof systems necessary for the
safety or effectiveness of the structure.
Town of North Yarmouth Land Use Ordinance
Page 68 of 292
4. Conditions for Variances: In hearing variances under this, the ZBA shall determine whether
the appellant's proposal will satisfy the following criteria, and in granting any variance it may
impose such conditions as it deems necessary to assure compliance with the applicable
requirements set forth in subsections 1, 2 and 3., above, and with the following criteria:
a. The proposal must include any special screening, fencing, or other buffer necessary to set
off the subject property from abutting uses or to assure the continued enjoyment of abutting
uses;
b. The proposal must adequately provide for drainage through and for preservation of existing
topography within its location, particularly in minimizing any cut, fill, or paving intended;
c. The proposal must not create or increase any fire hazard or any hazards to safe, convenient
pedestrian or vehicular flow;
d. The proposal must prevent or avoid the creation of any nuisance affecting adjacent
properties;
e. The proposal must include provision for adequate, lawful sewage disposal and healthful
domestic water supplies;
f.
The proposal should not have a significantly adverse effect on adjacent or nearby property
values;
g. The appellant must be found to have adequate financial and technical capacity to satisfy the
foregoing criteria and to develop and thereafter maintain the proposed project or use in
accordance with all applicable requirements.
5. Mandatory Shoreland Zoning Requirement: This requirement is applicable to areas subject
to the Mandatory Shoreland Zoning Act (Residential Shoreland District and Resource Protection
District). A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the CEO to the Commissioner of
the Department of Environmental Protection at least 20 days prior to action by the ZBA. Any
comments received from the Commissioner prior to action taken by the ZBA shall be made a
part of the record and shall be taken into consideration by the ZBA.
6. Recording of Variances at Registry of Deeds: If a variance is granted under this section, a
certificate indicating the name of the current property owner, identifying the property by
reference to the last recorded deed in its chain of title and indicating the fact that a variance
including any conditions on the variance, has been granted and the date of the granting, shall
be prepared in recordable form. The certificate must be recorded in the Cumberland County
Registry of Deeds within 90 days of the final approval of the variance or the variance is void. The
variance is not valid until recorded as provided in this provision. For purposes of this subsection,
the date of the final written approval shall be the date stated on the written approval. It is the
applicant's responsibility to obtain a Variance Certificate from the CEO, and to record this
Certificate at the Cumberland County Registry of Deeds.
7. Expiration of Variances: Notwithstanding the recording of a certificate of variance, the
applicant's legal rights set forth in a variance shall expire if the construction, alteration or action
contemplated by the variance, if any is not substantially completed within one year from the date
on which the ZBA voted to grant the variance(s). [Amended 6/18/11]
Town of North Yarmouth Land Use Ordinance
Page 69 of 292
VII.
ZONING DISTRICT REGULATIONS
SECTION 7.1 ESTABLISHMENT OF DISTRICTS
A. Land Use Districts: To implement the provisions of this Ordinance, the town is hereby divided
into the following zoning districts:
1. Village Center District
2. Village Residential District
3. Farm and Forest District
4. Residential Shoreland District
5. Resource Protection District
B. Overlay Districts: To further implement the provisions of this Ordinance, the town is hereby
divided into overlay districts. The provisions of overlay districts will be in addition to those of the
above underlying districts. Whenever the requirements of the Overlay Districts differ from the
requirements of the underlying district, the most restrictive, or those imposing the higher
standards, shall govern. The overlay districts are as follows:
1. Groundwater Protection Overlay District
2. Royal River Corridor Overlay District
SECTION 7.2 ZONING MAP AND LOCATIONS OF DISTRICTS
The zoning districts are defined as shown on the official map entitled "Town of North Yarmouth Zoning
Map", as may be amended from time to time. The Town of North Yarmouth Zoning Map (Zoning Map)
shall be certified by the attested signature of the Town Clerk and shall be kept on file by the Town Clerk.
The Town of North Yarmouth Zoning Map is hereby made part of this Ordinance.
A. Location of District Boundaries: The boundaries of the zoning districts are as shown on the
Zoning Map. Where the Zoning Map shows zoning district boundary lines as following railroads, utility
lines or public or private roads or ways, the centerlines of such roads or ways shall be the boundary
lines. Where district boundary lines are shown approximately on the location of existing property
lines or lot lines and the exact location of the boundaries of the district is not indicated by means of
figures, distances or otherwise described, the property or lot lines shall be the district boundary lines.
Where district boundary lines are shown upon the Zoning Map outside of road lines and
approximately parallel thereto, they shall be considered to be parallel to such roads. Figures on the
Zoning Map between district boundary lines and the nearest road lines indicate the measurement
between the same at right angles to the road lines unless otherwise specified. The boundaries of
the Groundwater Protection Overlay District that do not follow town lines, utility lines, or railroads are
the boundaries of the surface water watersheds to the existing and future wellheads of public water
supplies, as shown on the Zoning Map. In cases in which the location of boundaries is not defined
by detailed description at the time of enactment, such locations shall be determined by the distances
in feet, when given upon the Map. When distances are not given upon the Map, such locations shall
be determined by the scale of the map. Where uncertainty exists as to the location of any zoning
district boundary, the property owner so affected may request, in writing, that the Code Enforcement
Officer (CEO) make a formal, written determination. If the property owner does not agree with the
CEO's determination, the property owner may appeal this decision to the Zoning Board of Appeals
as an administrative appeal in accordance with Section VI. Variances and Appeals.
Town of North Yarmouth Land Use Ordinance
Page 70 of 292
B. Location of Resource Protection District, Residential Shoreland District, Royal River Corridor
Overlay District, Groundwater Protection Overlay District and the FEMA 100-year Floodplain
Boundaries: Where uncertainty exists as to the exact location of a Resource Protection District, a
Residential Shoreland District, a Royal River Corridor Overlay District, a Groundwater Protection
Overlay District, or the boundary of the FEMA 100-year floodplain (most recent mapping), the
following procedures shall be used to reach an official determination of the location:
1. Upon written request by a property owner, town board or a town staff person, the CEO shall
determine, in writing, the location of the district boundaries based on the Zoning Map, this
Ordinance, Yarmouth Water District or other experts, documents cited in this Ordinance and
similar materials and on-site field verification, as applicable. If a requesting property owner
believes that an initial determination by the CEO is in error or if reasonable doubt exists regarding
the existence, classification or location of the district, the property owner may submit information
on soils, vegetation or other pertinent information, and request a meeting with the CEO to
reconsider the determination. If the property owner does not concur with the reconsidered
determination, the CEO shall refer the issue to the Planning Board for its review and
determination, to be made with the advice of the Yarmouth Water District, or other experts, as
appropriate.
2. If an applicant disputes the determination of the boundaries or the Resource Protection District,
the Residential Shoreland District, the Royal River Corridor Overlay District, the Groundwater
Protection Overlay District and/or the FEMA 100-year floodplain, or if the CEO concludes that
the location of the boundary is in doubt, the applicant shall submit the following information, as
applicable, to the Planning Board, unless otherwise waived by the Planning Board:
a. A site plan map showing the proposed use, structure or activity including a map at a scale of
one inch equals fifty feet (1"=50'), including the boundaries of the Resource Protection
District, the Residential Shoreland District, the Royal River Corridor Overlay District, the
Ground Water Protection Overlay District and/or the 100-year floodplain scaled from the
ZoningMap;
b. A topographic map showing the location and slopes for all grades within the site, by not
greater than 2-foot contours;
c. For wetlands, a high intensity soils map showing the wetland upland edge for the site as
defined by wetland soils, and a description of the vegetative cover of the site, including
dominant species and the location of the wetland upper edge for the site based on
vegetation.
d. For 100-year floodplain areas, written certification as to the location of the 100-year
floodplain boundary to include a map of the 100-year floodplain boundary overlaid onto a
USGS Quadrangle Map or other topographic map by a professional land surveyor,
registered professional engineer or architect. The determination shall be based on
engineering practices recognized by the Federal Emergency Management Agency (FEMA)
and the provisions of the town's Floodplain Management Ordinance, including the most
recent FEMA maps for the town. All proposals include base flood elevations, flood
boundaries, and, in a riverine 100-year floodplain, floodway data. These determinations
shall be based on engineering practices recognized by the Federal Emergency
Management Agency.
Town of North Yarmouth Land Use Ordinance
Page 71 of 292
e. A statement, supported by necessary documentation, explaining why the site is not within a
Resource Protection District, Residential Shoreland District, Royal River Corridor Overlay
District, Groundwater Protection Overlay District or FEMA 100-year floodplain as defined
herein; and
f.
Additional information deemed necessary by the Planning Board.
3. In determining the existence and boundaries of particular wetland areas, district boundaries and
buffer areas, the CEO or the Planning Board may request the Yarmouth Water District, or other
expert to inspect the site and submit recommendations in writing.
4. In evaluating wetland, 100-year floodplain, shoreland or groundwater overlay boundaries, the
CEO, Planning Board may consult with expert persons or agencies.
5. In all cases, the burden of proof shall be on the applicant to show that the site in question is not
within a Resource Protection District, Residential Shoreland District, Royal River Corridor
Overlay District, Groundwater Protection Overlay District or FEMA 100-year floodplain.
C. Lots in Two or More Districts: Where a district boundary line as established in this Ordinance and
as shown on the Zoning Map divides a lot which existed at the time of enactment of this Ordinance,
the use and other requirements applying to the less restricted portion of such lot under this
Ordinance may be extended not more than 50 feet beyond the district boundary line into the lot in
the more restricted district. If any portion of the lot is located within the Groundwater Protection
Overlay District, the Royal River Corridor Overlay District, the Residential Shoreland District, the
Resource Protection District and/or the FEMA 100-year floodplain each portion of the lot shall be
governed by the zoning district regulations in which it is located.
SECTION 7.3 DISTRICT PURPOSES [AMENDED 5/17/08]
A. Village Center District: The Village Center District is the civic and cultural core of the community,
consisting of village scale, mixed uses and residential neighborhoods. The density and intensity of
uses should reflect the ability of the soils to provide for waste disposal, based on available
technology, until centralized sewer becomes available. This district is to be attractive, well
maintained and highly desirable for residential living and the development of compatible
nonresidential uses that provide convenient access to goods and services. This district should be
pedestrian friendly, with public space for community interaction. Natural vegetation, supplemented
with plantings, should provide privacy, improve aesthetics, minimize noise, and otherwise enhance
the environment. Design and performance standards include provisions to buffer residential uses
from any potential undesirable effects of nonresidential uses. Dimensional standards should be
flexible to allow for creative development designs consistent with the existing village character. New
village uses should be sensitive to the existing historic character, topography and natural resources
of the area. Open space and passive recreational areas should be within walking distance of all
areas of the district. New development is most desirable with frontage on roads off the main
thoroughfares, so that curb cuts are kept to a minimum along Routes 9, 115 and 231. One of the
primary purposes of the Village Center District is to encourage build- out in this district prior to more
intensive development of the Village Residential District.
B. Village Residential District: Village Residential Districts allow for future expansion of the historic
pattern and character of the Village Center District, to include medium density residential
neighborhoods and small scale, low intensity nonresidential uses, such as corner grocery and
convenience stores. The density and intensity of uses should reflect the ability of the soils to provide
for waste disposal, based on available technology, until centralized sewer becomes available. The
Village Residential District should be similar to the Village Center District, but should reflect a desire
Town of North Yarmouth Land Use Ordinance
Page 72 of 292
to have less commercial and industrial development. Dimensional standards should be designed to
encourage the development of backland served by internal roads or streets, and discourage
individual curb cuts off state highways.
C. Reserved (Transitional Residential District): Explanatory Note - As of the adoption of this
Ordinance on June 14, 2005, Transitional Residential Districts are not a part of this Ordinance. The
Comprehensive Plan recommends that Transitional Residential Districts be established in areas
adjacent to Yarmouth along Sligo Road and North Road after the town of Yarmouth zones adjacent
areas for growth or after sewer becomes readily available to these areas. These districts are
designed to allow for orderly expansion of development from the town of Yarmouth into North
Yarmouth.
D. Farm And Forest District: The Farm and Forest District is designed to preserve rural character
with low- density development and minimal impact on public roads and services, thereby conserving
open space, forest and farmland, water resources, wildlife habitat and high priority open spaces,
such as the Royal River corridor, Pratt's Brook corridor, and the Deer Brook - Knight's Pond area.
This District allows low-density residential uses and provides areas for resource-based land uses,
such as forestry, agriculture and low-intensity outdoor recreation. Conservation and/or cluster
subdivisions that preserve at least 50 percent of the land in open space are required. Home
occupations and other compatible, low-intensity nonresidential uses are permitted, but must be
designed to be consistent with the purposes of this district. Land uses that generate considerable
traffic or require access to public services or facilities are restricted. Access management and
preservation of rural scenic character is maintained through site distance requirements, curb cut
limitations, screening and preservation of natural buffers along state and town roads. The rate of
new residential construction shall be limited in these areas.
E. Residential Shoreland District: The Residential Shoreland District includes those shoreland
areas suitable for residential and recreational development. As a shoreland district, this district must
also further the maintenance of safe and healthful conditions; prevent and control water pollution;
protect fish spawning grounds, aquatic life, bird and other wildlife habitat; protect buildings and lands
from flooding and accelerated erosion; protect archaeological and historic resources; protect
wetlands; control building sites, placement of structures and land uses; conserve shore cover, and
visual as well as actual points of access to bodies of water; conserve natural beauty and open space;
and anticipate and respond to the impacts of development in shoreland areas. This district is
established in accordance with the provisions of 38 M.R.S. Section 435 et seq. (Maine Mandatory
Shoreland Zoning Act). This district includes areas within 250 feet, horizontal distance, of the upland
edge of the Deer Brook wetland and Knight's Pond that are not included in the Resource Protection
District as displayed on the Zoning Map.
F. Natural Resource Protection District: The Natural Resource Protection District provides the
highest level of protection in areas where development would adversely affect water quality,
productive habitat, biological ecosystems, or scenic and natural values when associated with
wetlands and shorelands. As a shoreland district, this district shall further the maintenance of safe
and healthful conditions; prevent and control water pollution; protect fish spawning grounds, aquatic
life, bird and other wildlife habitat; protect buildings and lands from flooding and accelerated erosion;
protect archaeological and historic resources; protect wetlands; control building sites, placement of
structures and land uses; conserve shore cover, and visual as well as actual points of access to
bodies of water; conserve natural beauty and open space; and anticipate and respond to the
impacts of development in shoreland areas. This district is established in accordance with the
provisions of 38 M.R.S. Section 435 et seq. (Maine Mandatory Shoreland Zoning Act). The Natural
Resource Protection District shall include:
1. Areas within 250 feet, horizontal distance, of the normal high-water line of the Royal River,
Chandler Brook and the East Branch;
Town of North Yarmouth Land Use Ordinance
Page 73 of 292
2. Areas within 150 feet, horizontal distance, of the normal high-water line of Deer Brook, Toddy
Brook, Pratt's Brook and an unnamed tributary to Chandler Brook;
3. Areas within 150 feet, horizontal distance, of the upland edge of Knight's Pond and the
Deer Brook wetland.
G. Royal River Corridor Overlay District: The Royal River Corridor Overlay District includes land
areas within 500 feet on either side of the Royal River, Chandler Brook and the East Branch. The Royal
River Corridor Overlay District is designed to provide additional standards to preserve the Royal
River corridor, the Chandler Brook corridor and the East Branch corridor as greenways in open space
uses. The purpose of the Royal River Corridor Overlay District is to preserve open space and
conserve natural beauty; protect wildlife habitat and corridors; protect water quality; protect
archaeological and historic resources; provide passive recreational corridors; control building sites
and placement of structures and land uses; and anticipate and respond to the impacts of
development in the river and stream corridors.
H. Groundwater Protection Overlay District: The Groundwater Protection Overlay District is
designed to maintain and preserve critical groundwater resources associated with existing and future
public and private water supplies, including wellhead protection areas for Yarmouth Water District
wells. The protection of groundwater is critical to promoting the health, safety and general welfare
of the residents of North Yarmouth and other users of the public water supplies.
SECTION 7.4 DISTRICT LAND USE TABLE [AMENDED 6/19/21]
A. General: All land use activities shall conform to the use, development, and performance and design
standards of the district(s) in which such use is located and all standards identified in Section XI
Standards for Specific Activities. The following Table 7-1. Land Uses by District identifies which uses
of land, buildings, or structures are permitted by right, permitted subject to review, and/or permitted
subject to the issuance of a conditional use permit in the various districts. Throughout this
Ordinance reference is made to Table 7-1. in which allowed uses, permitted uses, conditional uses
and prohibited uses are organized by categories of use such as "residential uses" or "institutional
uses." These headings or categories shall carry no legal meaning, but rather serve only for
organizational purposes.
B. Overlay Districts: In order to be permitted in an overlay district (Groundwater Protection Overlay
District, Royal River Corridor Overlay District), a use must be listed and approved, as applicable,
as an allowed (A), permitted (P, SPR), and/or conditional use (CU/SPR) in both the overlay district
and the underlying district. If the use is prohibited (N) in either the overlay district or the underlying
district it is a prohibited use. Where there is a discrepancy between the requirements of the overlay
district and the underlying district, the more restrictive requirement or provision applies.
C. Accessory Uses and Structures: Any accessory structure or use shall require a permit from the
same permitting authority as would be required for the principal use or structure in accordance with
Table 7-1 except as follows:
The Code Enforcement Officer may permit an accessory structure of up to 600 square feet in size
in either the Royal River Corridor Overlay District or the Ground Water Protection Overlay District
using the same criteria and standards as if the review were conducted by the Planning Board.
[Amended 6/28/11]
For example, a swimming pool (an accessory use) associated with a single-family residence (the
principal use) would require a permit from the CEO in the Village Center District. No permit is
required if a shed is less than 200 sq. ft. in total area and has a height less than 15 feet.
Town of North Yarmouth Land Use Ordinance
Page 74 of 292
TABLE 7-1 LAND USES BY DISTRICT KEY
A = Allowed Uses (A): Allowed Uses do not generally require review by the Code Enforcement Officer or a
town board. However, some activities associated with allowed uses require permits, such as new
driveways, signs, subsurface waste disposal systems, etc. (See Table 7-1). Allowed uses must also
conform, as applicable, to the provisions of this Ordinance, including Section III. Administration and
Enforcement, Section VII. General Requirements Applicable to All Land Uses, and Section IX. Special
District Standards (Groundwater Protection Overlay District, Residential Shoreland District and
Resource Protection District Provisions)
P = Permitted Uses Requiring a Permit from the Code Enforcement Officer: Uses displayed in Table 7-
1. as being Permitted Uses (P) shall require approval from the Code Enforcement Officer in
accordance with the provisions of this Ordinance, including, but not limited to, Section VIII. General
Requirements Applicable to All Land Uses, and Section IX. Special District Standards (Groundwater
Protection Overlay District, Residential Shoreland District, Resource Protection District Provisions,
Royal River Corridor Overlay District)
SPR = Site Plan Review Permit Required from the Planning Board: Uses displayed in Table 7-1. as requiring
Site Plan Review (SPR) shall require approval from the Planning Board in accordance with the
provisions Section IV. Site Plan Review and Conditional Uses and the other applicable provision of
this Ordinance.
CU/SPR = Conditional Use Permit and Site Plan Review Permit Required from the Planning Board: Uses
displayed in Table 7-1. as Conditional Uses (CU/SPR) shall require approval from the Planning Board
in accordance with the provisions of Section IV. Site Plan Review and Conditional Uses and the other
applicable provision of this Ordinance.
N = Prohibited Use
Town of North Yarmouth Land Use Ordinance
Page 75 of 292
Footnotes Key -
(1)
Includes Community Living Arrangements. See Section X11. Definitions for more information.
(2)
Single-family residential structures may be allowed by special exception only according to the provisions of
Section 7.5 Special Exceptions. Two family residential structures are prohibited.
(3)
Manufactured Housing shall meet the requirements of Section 11.5 Manufactured Housing on Individual Lots.
(4)
Accessory dwelling units shall meet the requirements of Section 11.1 Accessory Dwelling Units.
(5)
Home occupations shall meet the requirements of Section 11.4 Home Occupations.
(6)
Home Heating Fuel Tanks & Fuel Storage shall meet the requirements of Section 10.12.C. Home Heating
Fuel Tanks & Fuel Storage.
(7)
Signs, exterior displays and any other indications of a home-based occupation in a residential zone shall meet
the requirements of Section 10.7. B.11.
(8)
See Section 10.4 for permitted building types in the Residential Shoreland District.
(9)
See Section 9.1 for additional restrictions in the Resource Protection District and Residential Shoreland
District.
(10)
See Section 12 Definitions for additional information related to Essential Services
(11)
See Section 12 Definitions and Section 9.1.P. for additional information related to Service Drops.
(12)
Nursing Homes/Congregate Care must be served by sewer or advanced wastewater treatment systems for on-
site sewage disposal.
(13)
Refer to Section 12 Definitions for additional information related to Cemeteries.
(14)
Clubhouses are prohibited in the Resource Protection District.
(15)
Piers/Docks/Wharfs/Bridges - Permanent are allowed via Planning Board approval &
Piers/Docks/Wharfs/Bridges - Temporary are allowed via CEO approval, excluding bridges and other
crossings not involving earth work, in which case no permit is required [Amended 5/17/08].
(16)
Refer to Section 12 Definitions for additional information related to Agriculture.
(17)
Permit required when timber harvest consists of more than 5 acres (this includes transportation or utility
corridors).
(18)
Abandoned wells must be filled with inert material; See Section 9.2.H. Groundwater Protection Overlay
District; Best Management Practices for additional information.
(19)
No more than 660 gallons of liquid fuel per parcel of land may be stored on-site for a Private Airstrip. Also
see Section 10.12 Hazardous, Special, and Radioactive Materials.
(20)
Refer to Section 9.1.K. Residential Shoreland District and Resource Protection District Performance
Standards: Parking Areas for additional information related to parking associated with single-family
dwellings, two-family dwellings and non-commercial farmstands.
(21)
Except as provided in Section 9.1.L. Residential Shoreland District and Resource Protection District
Performance Standards: Roads and Driveways [Amended 5/17/08] for additional information related to road
and driveway construction.
Town of North Yarmouth Land Use Ordinance
Page 76 of 292
TABLE 7.1 LAND USES BY ZONING DISTRICT [AMENDED 5/17/08,1 6/19/21, 06/17/23; 6/17/24]
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU
= Conditional Use (Planning Board Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal River
Overlay*
Groundwater
Overlay*
Residential Uses
Single-family detached dwelling1
P
P
P
N
P
SPR
P
Duplex
P
P
P
N
P
SPR
P
Manufactured housing - individual lot3
P
P
P
N
P
SPR
P
Conversions - seasonal to year-round residences
P
P
P
N
P
SPR
P
Mobile Home Park
CU/SPR
SPR
N
N
N
N
N
Multiple Multifamily dwelling units in a permitted Building
Type
SPR
N
N
N
N
N
SPR
Accessory Dwelling Unit4 [Amended 5/17/08]
P
P
P
N
P
P
P
Accessory use - Home Occupation5
P
P
P
N
SPR
SPR
SPR
Home heating fuel tanks & fuel storage (greater than 660
gallons of liquid fuel6 per parcel of land)
SPR
SPR
SPR
N
N
N
N
Accessory use - Home Based Occupation7 [Amended
5/30/09]
P
P
P
N
N
SPR
SPR
Commercial and Industrial Uses
Beauty salons
SPR
CU/SPR
N
N
N
N
CU/SPR
Bed and breakfast
SPR
SPR
SPR**
N
N
N
SPR
Boat builders and refinishers
SPR
N
N
N
N
N
N
Business/professional office less than 2,000 sq.ft. gross
floor area
SPR
SPR
CU/SPR**
N
N
N
SPR
Business/professional office, 2,000 to 10,000 sq.ft.
gross floor area
SPR
N
N
N
N
N
SPR
Retail sales/services, less than 2,000 sq.ft. gross floor area
SPR
SPR
N
N
N
N
SPR
Retail sales/services, 2,000 to 10,000 sq.ft. gross floor area
SPR
N
N
N
N
N
CU/SPR
Notes: *Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including
"Allowed Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East
Branch.
**Can only be conversions of buildings in existence as of June 14, 2005
.*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 77 of 292
TABLE 7.1 LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU =
Conditional Use (Planning Board Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal
River
Overlay*
Groundwater
Overlay*
Commercial and Industrial Uses (continued)
Retail sales/services with 10,000 sq.ft. gross floor area, or more
N
N
N
N
N
N
N
Restaurants with less than 2,000 sq.ft. gross floor area
SPR
SPR
CU/SPR **
N
N
N
SPR
Restaurants with 2,000 sq.ft. gross floor area, or more
SPR
SPR
CU/SPR**
N
N
N
CU/SPR
Tavern
CU/SPR
CU/SPR
CU/SPR
N
N
N
CU/SPR
Small Brewery, Small Winery, Small Distillery
CU/SPR
CU/SPR
CU/SPR
N
N
N
CU/SPR
Assembly Venue
SPR
SPR
SPR
N
N
CU/SPR
CU/SPR
Farm Stand
A
A
A
N
N
A
A
Takeout eating place
SPR
SPR
N
N
N
N
SPR
Drive-through eating place
N
N
N
N
N
N
N
Redemption center less than 2,000 sq. ft. gross floor area
SPR
N
N
N
N
N
N
Commercial food processors, other than those where food is
raised on the premises (see Natural Resource Based Uses)
SPR
SPR
SPR
N
N
N
N
Financial institution
SPR
N
N
N
N
N
SPR
Financial institution with drive through
CU/SPR
N
N
N
N
N
CU/SPR
Laundromat
SPR
N
N
N
N
N
SPR
Dry cleaners' drop-off, no dry cleaning - processing
SPR
SPR
N
N
N
N
SPR
Dry cleaners - processing
N
N
N
N
N
N
N
Printers and photo processors
SPR
CU/SPR
N
N
N
N
CU/SPR
Motor vehicle services/repairs and body shops/sales [limited to
small operations; 10 or fewer vehicles on site at a time]
SPR
CU/SPR
CU/SPR
N
N
N
N
Gas and/or service stations, sale of gas accessory to retail
SPR
CU/SPR
N
N
N
N
N
Petroleum/petroleum product storage for retail/wholesale sales,
including fuel oil distributors
N
N
N
N
N
N
N
Petroleum/petroleum product use/storage for business use;
more than 660 gallons of liquid fuel per parcel
SPR
SPR
SPR
N
N
N
N
Petroleum/petroleum product use/storage for business use; 660
gallons or less of liquid fuel1 per parcel
P
P
P
N
N
N
CU/SPR
Auto washing facilities
SPR
N
N
N
N
N
SPR
Notes: *Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including "Allowed
Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
**Can only be conversions of buildings in existence as of June 14, 2005
.*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 78 of 292
TABLE 7.1 LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU = Conditional Use (Planning
Board Review); N = Prohibited Use
USES ***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal
River
Overlay*
Groundwater
Overlay*
Commercial and Industrial Uses (continued)
Discharge of non-domestic wastewater or wash water to an
onsite septic disposal system
N
N
N
N
N
N
N
Light manufacturing, Warehousing & Storage, and Trucking &
Distribution less than 5,000 sq.ft. gross floor area
SPR
SPR
SPR
N
N
N
CU/SPR***
Light manufacturing, 5,000 sq.ft. to 20,000 sq.ft. gross floor area
SPR
SPR
SPR
N
N
N
N
Warehousing & storage, 5,000 to 20,000 sq.ft. gross floor area
SPR
N
CU/SPR
N
N
N
N
Trucking & distribution facility, 5,000 to 20,000 sq.ft. gross floor
area
SPR
N
CU/SPR
N
N
N
N
Wholesale business, research & development, light
manufacturing, warehousing & storage, or trucking & distribution
facility, 20,000 sq.ft. gross floor area or more
N
N
N
N
N
N
N
Excavating contractors and general contractors
SPR
SPR
SPR
N
N
N
SPR
Funeral homes
CU/SPR
CU/SPR
N
N
N
N
SPR
Non-domestic solid waste disposal, transfer station and/or
recycling facility
N
N
N
N
N
N
N
Junkyard/auto graveyard/auto recycling
N
N
N
N
N
N
N
Notes: *Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including "Allowed
Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
**Can only be conversions of buildings in existence as of June 14, 2005.
*** For all Land Use definitions please refer to Section XII Definitions ****Except that the Planning Board may substitute "sq. ft. of Building Footprint" for "sq. ft. gross floor area", as long as the
applicant shows that the additional square footage will not impact the site as far as standards of review such as parking, # of employees, and impervious surface restrictions, and any other
requirements of review. [Amended 5/13/06]
Town of North Yarmouth Land Use Ordinance
Page 79 of 292
TABLE 7.1 LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU = Conditional Use (Planning
Board Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal
River
Overlay*
Groundwater
Overlay*
Utility Uses
Essential services, excepting the following (a. and b.)10 [Amended
5/17/08]
P
P
P
SPR
SPR
P
CU/SPR
a. Roadside distribution lines (34.5kV and lower)
P
P
P
P
P
P
P
b. non-roadside or cross-country distribution lines
P
P
P
SPR
SPR
SPR
P
Large scale solar system
SPR
SPR
SPR
N
N
N
SPR
Service drops, as defined, to allowed uses11
A
A
A
P
A
P
A
Public utility buildings
SPR
SPR
SPR
SPR
SPR
SPR
SPR
Oil pipelines
CU/SPR
CU/SPR
CU/SPR
CU/SPR
CU/SPR
CU/SPR
N
Telecommunications towers
SPR
CU/SPR
SPR
N
SPR
N
SPR
Institutional Uses
Public and private schools
SPR
SPR
CU/SPR
N
N
N
SPR
Public and private schools over 50,000 sq ft
CU/SPR
N
N
N
N
N
CU/SPR
Day care and nursery schools
SPR
SPR
CU/SPR
N
N
N
SPR
Church including accessory residence
SPR
SPR
SPR
N
N
CU/SPR
CU/SPR
Cemetery 13
SPR
SPR
P
N
N
N
N
Library and museum
SPR
SPR
N
N
N
N
SPR
Fraternal and social institutions
SPR
CU/SPR
CU/SPR
N
N
N
CU/SPR
Municipal and other governmental buildings
SPR
SPR
SPR
N
N
N
SPR
New municipal transfer stations
SPR
SPR
SPR
N
N
N
N
Municipal recycling facility
SPR
SPR
N
N
N
N
SPR
Nursing home/congregate care
SPR
CU/SPR
N
N
N
N
SPR12
Small non-residential facilities less than 5,000 sq.ft gross floor area
for educational, scientific, or nature interpretation purposes
SPR
SPR
SPR
N
SPR
N
SPR
Notes:
*Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses,
including "Allowed Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 80 of 292
TABLE 7-1. LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU = Conditional Use (Planning
Board Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal
River
Overlay*
Groundwater
Overlay*
Recreational Uses
Campground
N
N
SPR
N
SPR
CU/SPR
N
Individual campsite
P
P
P
P
P
P
P
Golf course including club house
SPR
SPR
SPR
CU/SPR14
SPR
N
N
Fully enclosed places of recreation
SPR
CU/SPR
N
N
N
N
SPR
Piers/Docks/Wharfs/Bridges - Permanent
P
P
P
SPR15
SPR15
SPR
SPR
Piers/Docks/Wharfs/Bridges - Temporary
P
P
P
P15
P15
P
P
Marinas/Sheds/Boating facilities
-
-
-
N
SPR
N
N
Non-intensive recreational uses not requiring structures, roads or
parking facilities, such as hunting, fishing, hiking
A
A
A
A
A
A
A
Government and non-profit parks and outdoor recreation
P
P
P
CU/SPR
SPR
SPR
SPR
Public and private recreational areas involving no structural
development; recreational trails
A
A
A
SPR
SPR
SPR
A
Natural Resource Based Uses
Aquaculture
A
A
A
SPR
SPR
SPR
N
Agriculture16
A
A
A
SPR
A
A
SPR
Commercial processing of vegetables/crops raised on premises
P
P
P
N
SPR
N
SPR
Commercial processing of poultry and/or livestock raised on the
premises (meat packer, slaughterhouse)
SPR
SPR
SPR
N
N
N
N
Storage, handling, processing, disposal and/or utilization of
sludge/ash
N
N
N
N
N
N
N
Forest management activities, except timber harvesting
A
A
A
A
A
A
A
Notes: *Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including "Allowed
Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
.*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 81 of 292
TABLE 7-1. LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU = Conditional Use (Planning
Board Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal River
Overlay*
Groundwater
Overlay*
Natural Resource Based Uses (continued)
Timber harvesting
A
A
A
P
A
A
SPR17
Mineral exploration
N
N
P
N
P
A
N
Mineral extraction (including sand & gravel) 100 cubic yards to 999
cubic yards within any 12-month period
A
A
A
N
CU/SPR
N
CU/SPR
Commercial mineral extraction (including sand & gravel) 1,000 cubic
yards or more within any 12-month period
N
N
SPR
N
N
N
N
Lumber yards including milling, distribution of wood products,
wholesale/retail sales of building materials
SPR
SPR
CU/SPR
N
N
N
SPR
Commercial processing of wood including cutting, sawing, splitting,
and chipping
SPR
SPR
SPR
N
N
N
SPR
Landscaping business, nursery, garden center
SPR
SPR
SPR
N
N
N
N
Soil and water conservation practices
A
A
A
A
A
A
A
Surveying and resource analysis
A
A
A
A
A
A
A
Wildlife management practices
A
A
A
A
A
A
A
Municipal and Public Safety Signs
SPR
SPR
SPR
SPR
SPR
SPR
SPR
Notes: *Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including "Allowed
Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
.
*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 82 of 292
TABLE 7-1. LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU = Conditional Use (Planning
Board Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal
River
Overlay*
Groundwater
Overlay*
Other Uses
Abandoned wells
N
N
N
N
N
N
N18
Private airstrip
P
P
P
N
CU/SPR
N
CU/SPR19
Commercial airport: fueling area or maintenance area
N
N
CU/SPR
N
N
N
N
Clearing or removal of vegetation for activities other than timber
harvesting [Amended 5/17/08]
A
A
A
SPR
A
SPR
A
Demolition
P
P
P
P
P
P
P
Family Burial Ground [Amended 4/28/18]
SPR
SPR
SPR
SPR
SPR
SPR
SPR
Filling and earth moving of less than 10 cubic yards
A
A
A
P
A
A
A
Filling and earth moving of 10 cubic yards or more
A
A
A
SPR
P
P
P
Emergency operations and fire prevention activities
A
A
A
A
A
A
A
Land reclamation
P
P
P
SPR
P
SPR
SPR
Storage of chemicals, including herbicides, pesticides or
fertilizers other than amounts normally associated with individual
households or farms
SPR
SPR
SPR
N
N
N
N
Subsurface waste disposal and sewage systems
P
P
P
P
P
P
P
Advanced wastewater treatment systems
P
P
P
P
P
P
SPR
Storm water impoundments
SPR
SPR
SPR
N
N
N
SPR
Wastewater impoundments
N
N
N
N
N
N
N
Industrial waste disposal
N
N
N
N
N
N
N
Notes: *Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including "Allowed
Uses" must comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
.*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 83 of 292
TABLE 7-1. LAND USES BY ZONING DISTRICT (continued from prior page)
A = Allowed Use; P = Permitted Use (CEO Review); SPR = Site Plan Review (Planning Board Review) CU = Conditional Use (Planning Board
Review); N = Prohibited Use
USES***
Village
Center
Village
Residential
Farm and
Forest
Resource
Protection9
Residential
Shoreland9
Royal
River
Overlay*
Groundwater
Overlay*
Other Uses (continued)
Parking associated with single family and two-family dwellings, and
non-commercial farmsteads
A
A
A
N20
SPR
SPR
A
Parking associated with uses other than single-family and two-family
dwellings, and non-commercial farmsteads
SPR
SPR
SPR
N
SPR
SPR
SPR
Road, driveway construction
P
P
P
N21
SPR
SPR
P
New or expanded driveway/entrance onto public road
P
P
P
N
SPR
SPR
P
Overnight storage or parking of vehicles and equipment containing
over 50 gallons of fuel, excluding municipal storage and parking of
vehicles
A
A
A
N
N
N
P
Covered sand and salt piles
P
P
P
N
N
N
SPR
Snow dumps
SPR
SPR
SPR
N
N
N
N
Railroad stations and railroad yards
CU/SPR
SPR
SPR
N
N
N
N
Underground fuel storage tanks, other than propane
P
P
P
N
N
N
N
Signs
P
P
P
P
P
SPR
P
Notes:
*Overlay Districts are regulations and standards in addition to those of the underlying district. Where there is a discrepancy, the more restrictive provision applies. All uses, including "Allowed Uses" must
comply with the Overlay District Performance Standards. The Royal River Corridor Overlay District includes the Royal River, Chandler Brook and the East Branch.
.*** For all Land Use definitions please refer to section XII Definitions
Town of North Yarmouth Land Use Ordinance
Page 84 of 292
SECTION 7.5 SPECIAL EXCEPTION FOR SINGLE FAMILY DWELLINGS AND ACCESSORY
STRUCTURES IN THE RESOURCE PROTECTION DISTRICT [AMENDED 5/17/08; 6/17/24]
A. New Single Family Residential Dwelling: The Planning Board may approve a building permit for
a new single-family residential dwelling in a Resource Protection District provided that the applicant
demonstrates that all of the following conditions are met:
1. There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
2. The lot on which the structure is proposed is undeveloped and was established and recorded
in the Cumberland County Registry of Deeds before the adoption of the Resource Protection
District.
3. All proposed buildings, sewage disposal systems and other improvements are:
a. Located on natural ground slopes of less than 20 percent; and
b. Located outside the floodway of the 100-year floodplain along rivers, as delineated on the
Federal Emergency Management Agency's Flood Boundary and Floodway Maps and Flood
Insurance Rate Maps; all buildings, including basements, are elevated at least one foot
above the 100-year floodplain elevation; and the development is otherwise in compliance
with the town's Floodplain Management Ordinance.
4. The total ground-floor area, including cantilevered or similar overhanging extensions, of all
principal and accessory structures is limited to a maximum of 1,500 square feet. This limitation
shall not be altered by variance.
5. All structures, except functionally water-dependent structures, are set back from the normal
high- water line of the Royal River, Chandler Brook, the East Branch, or Toddy Brook, Deer Brook,
Pratt's Brook or the unnamed tributary to Chandler Brook (as mapped), tributary streams, or the
upland edge of the Deer Brook wetland or Knight's Pond to the greatest practical extent, but not
less than 100 feet, horizontal distance. In determining the greatest practical extent, the Planning
Board shall consider the depth of the lot, the slope of the land, the potential for soil erosion, the
type and amount of vegetation to be removed, the proposed building site's elevation in regard to
the 100-year floodplain, and its proximity to the Deer Brook wetland, Knight's Pond and other
high-value wetlands.
B. Existing Single Family Residential Dwelling in the Resource Protection District Made Non-
conforming with the Adoption of this Ordinance: This provision applies to a parcel of land with
an existing single family residential dwelling that was legally in existence prior to the adoption of this
Ordinance (June 14, 2005), but which was made non-conforming by the adoption of this Ordinance
due to the rezoning of the parcel as a Resource Protection District. Under these conditions, the
Planning Board may approve a building permit for the expansion of the existing single-family
residential dwelling and/or for the addition of an accessory structure in the Resource Protection
District provided that the applicant demonstrates that all of the following conditions are met:
1. The lot on which the expansion of the single family dwelling or accessory structure is proposed
was established and recorded in the Cumberland County Registry of Deeds before the adoption
of this Ordinance (June 14, 2005) and the establishment of the Resource Protection District in
an area that was not zoned as a Resource Protection District prior to June 14, 2005.
Town of North Yarmouth Land Use Ordinance
Page 85 of 292
2. All proposed buildings, sewage disposal systems and other improvements are:
a. Located on natural ground slopes of less than 20 percent; and
b. Located outside the floodway of the 100-year floodplain as delineated on the Federal
Emergency Management Agency's Flood Boundary and Floodway Maps and Flood
Insurance Rate Maps; all buildings, including basements, are elevated at least one foot
above the 100- year floodplain elevation; and the development is otherwise in compliance
with the town's Floodplain Management Ordinance; and
c. Located outside a forested wetland larger than 2 acres that abuts the Royal River, Chandler
Brook or the East Branch.
3. The total ground-floor area, including cantilevered or similar overhanging extensions, of all
principal and accessory structures is limited to a maximum of 2,000 square feet. This limitation
shall not be altered by variance.
4. All structures, except functionally water-dependent structures, are set back from the normal
high- water line of the Royal River, Chandler Brook, the East Branch, or Toddy Brook, Deer Brook,
Pratt's Brook or the unnamed tributary to Chandler Brook (as mapped), tributary streams, or
upland edge of the Deer Brook wetland or Knight's Pond to the greatest practical extent, but not
less than 100 feet, horizontal distance. In determining the greatest practical extent, the Planning
Board shall consider the depth of the lot, the slope of the land, the potential for soil erosion, the
type and amount of vegetation to be removed, the proposed building site's elevation in regard to
the 100-year floodplain, and its proximity to the Deer Brook wetland, Knight's Pond and other
high-value wetlands.
5. The accessory structure may include structures for personal use, such as a garage, barn,
accessory dwelling unit or swimming pool, but may not include a home occupation, or any other
use prohibited within a Resource Protection District by this Ordinance.
SECTION 7.6 SPACE AND DIMENSIONAL REQUIREMENTS [AMENDED 5/17/08; 6/19/21; 6/17/24]
A. Minimum Requirements: All lots and structures in all districts shall comply with the following Space
and Dimensional Requirements. Other provisions of this Ordinance may impose additional
requirements. It is a violation of this Ordinance to create a lot that does not meet the space and
dimensional requirements of this section, unless allowed through another provisions of this
Ordinance.
B. Calculation of Lot Size and Dimensions: [Amended 4/9/16]
1. For the purpose of calculating dimensional requirements an acre shall be 43,560 square feet.
2. If more than one residential dwelling unit, principal governmental, institutional, commercial or
industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit or principal
structure. For purposes of this section, an accessory dwelling unit shall not be counted as a
residential unit or principal structure [Amended 5/17/08]
3. If more than one principal structure is located on a lot, the lot size and location of each structure
shall be such that a separate lot conforming to the provisions of this Ordinance could be created
for each building. The creation of a separate lot shall be demonstrated by submitting a plan to
the Code Enforcement Officer (CEO) showing how the land could be divided to create conforming
lots.
Town of North Yarmouth Land Use Ordinance
Page 86 of 292
4. Land beneath roads serving more than 2 lots shall not be included toward calculating minimum
lot area. In addition, the following areas shall not be included toward calculating minimum lot
area:
a. land below the normal high-water line of the Royal River, Chandler Brook and the East
Branch;
b. land below the normal high-water line of those sections of Toddy Brook, Pratt's Brook, Deer
Brook and the unnamed tributary to Chandler Brook that are zoned as Resource Protection
Districts; and
c. land below the upland edge of the Deer Brook Wetland or Knight's Pond Wetland.
5. Wherever possible, side lot lines shall be perpendicular to the street.
6. If a lot on one side of a stream, brook or private road fails to meet the minimum requirements
for lot size, it may be combined with a lot on the other side of the stream, brook or private road to
meet the minimum lot size.
Town of North Yarmouth Land Use Ordinance
Page 87 of 292
Footnotes Key --
(1) Refer to Section 7.6.C. Calculation of Net Residential Density and Net Residential Acreage for standards related
to Maximum Residential Density.
(2) Refer to Section 7.6.D. Pocket Neighborhoods for additional standards related to Pocket Neighborhoods.
(3) Maximum Structure Height is not applicable to wireless communication towers, windmills, antennas, barn silos
and structures having no floor area.
(4) Minimum Lot Size:
a. The minimum lot size can be reduced in the VC to 20,000 square feet when the lot is served by an
advanced wastewater treatment system, or the existing system is retrofitted with an advanced wastewater
system that meets or exceeds the standards and requirements imposed by Section 11.11.B of this Article.
b. Gallon Per Day (GPD) design flows may be utilized when presented and proven to not exceed the
assumed 4 bedroom or 360 GPD flows of a typical residential home per lot; this type of development
requires Planning Board approval.
c. Pocket Neighborhoods allow for the use of reduced lot size below 20,000 square feet; refer to Section
7.6.D. for more information.
(5) Open space or clustered subdivisions are mandatory in the Farm and Forest Zoning District and at least 50% of
the total parcel must be preserved; refer to Section 11.3 Cluster Housing Development and Open Space
Development for more information.
(6) Additional units may be constructed as a) one unit within or attached to the existing dwelling unit; b) one unit
detached; or c) one of each.
(7) If a property owner tears down an existing dwelling unit in order to construct more dwelling units, the lot shall
be treated as if the dwelling unit were still in existence for purposes of redevelopment.
(8) Maximum number of dwelling units per lot is as set forth in Section 10.4.
Town of North Yarmouth Land Use Ordinance
Page 88 of 292
TABLE 7.2 SPACE AND DIMENSIONAL REQUIREMENTS [AMENDED 6/19/21, 11/08/22; 6/17/24]
District
Minimum
Lot Area
Per
Dwelling
Unit
Size
(Acres)
Maximum
Residential
Density1
(Acres)
Maximum
Dwelling
Units per
Vacant Lot
(Residential)
Maximum
Dwelling
Units per
Lot with
Existing
Dwelling
Unit6,7
Maxim
um Lot
Cover
age (%)
Street
Frontage
(feet)
Structure
Setback
From
Property
Lines (Feet)
Maximum
Structure
Height
(Feet)3
Front Side Rear
Village
Center 2
1 acre4
N/A
See Note 8
See Note
8
70%
100' MIN
10' MIN
10' MIN
5' MIN
3 stories, no
higher than
50 feet
Village
Residential
1 acre
1 Residential unit per
acre;
Subdivisions - 1
residential unit per
net residential acre
2 units
3 units
30%
Routes 9,
115 and
231 - Min
200 feet;
Other
streets -
Min 100
feet
20' Min
10' MIN
10' MIN
2.5 stories,
no higher
than 35 feet
Farm and
Forest 5
3 acres
1 Residential unit
per 3 acres;
Subdivisions - 1
residential unit per 3
net residential acres
2 units
3 units
20%
Min 200
feet
50' Min
20' MIN
20' MIN
2.5 stories,
no higher
than 35 feet
Residential
Shoreland
3 acres
1 Residential unit
per 3 acres;
Subdivisions - 1
residential unit per 3
net residential acres
2 units
3 units
20%
Min 200
feet
50' Min
20' MIN
20' MIN
35'
Resource
Protection
3 acres
1 Residential unit
per 3 acres;
Subdivisions - 1
residential unit per 3
net residential acres
2 units
3 units
20%
Min 200
feet
50' Min
20' MIN
20' MIN
35'
Table Continued on Next Page
Town of North Yarmouth Land Use Ordinance
Page 89 of 292
TABLE 7.2 SPACE AND DIMENSIONAL REQUIREMENTS (Continued from prior page)
District
Minimum
Lot Size
(Acres)
Maximum Residential Density1
(Acres)
Maximum
Lot
Coverage
Street
Frontage
Structure
Setback from
Property
Lines
Maximum
Structure
Height
Royal River
Corridor
Overlay
3 acres
Same as underlying district
Same as underlying district
Groundwater
Protection
Overlay
Single lots not
part of a
subdivision
must meet
the minimums
for the
underlying
district; no
reduction in
lot size shall
be permitted.
Same as underlying district
Same as underlying district
Cross Reference Notes for other provisions with dimensional requirements:
Section 10.29 Subdivision Street Connectivity in the Village Center District and Village Residential
District - Provisions for the length, spacing and connectivity of streets in subdivisions.
Section 10.30 Subdivision Street Length in the Farm and Forest District and Residential Shoreland
District - Provisions for the length of dead-end streets in subdivisions.
Section 11.2 Affordable Housing - Encourages the use of clustered housing design pursuant to Section
11.3 Clustered Housing Development and Open Space Development and allows for the granting of a
density bonus of up to 20 percent under certain conditions.
Section 11.3 Clustered Housing Development and Open Space Development - Clustered housing
development and/or open space development is mandatory in the Farm and Forest District, Residential
Shoreland District and the Resource Protection District, and optional in the Village Center District and
Village Residential District. The provisions allow modification of minimum lot size, street frontage, maximum
lot coverage and setbacks to permit innovative approaches to development and environmental design in
accordance with the standards. Subsection C.7.b allows for a density bonus of up to 20 percent for the
inclusion of public open space for recreation and protection of high value scenic areas.
Section 11.6 Mobile Home Parks - Provisions for minimum lot size, setbacks, frontages, etc. for mobile
home parks.
C. Calculation of Net Residential Density and Net Residential Acreage: For the purposes of
creating a subdivision, net residential acreage shall be the area determined by the Planning Board
to be suitable for development.
1. The area shall be calculated by subtracting the following from the total acreage of the tract or
parcel:
a. Areas that are cut off from the main parcel by existing land uses, improvements,
topographical features or previous conveyances so that no means of access can be
Town of North Yarmouth Land Use Ordinance
Page 90 of 292
reasonably provided, and the land is isolated and unavailable for development;
b. Areas located below the normal high water mark of water bodies (ponds, rivers, streams or
brooks) abutting or located on the parcel;
c. Areas located in the 100-year floodplain as designated on the most recently adopted Flood
Insurance Rate Map and the Flood Hazard Area Map of the National Flood Insurance
Program for the Town of North Yarmouth;
d. Areas within 250 feet of the Royal River, Chandler Brook, and the East Branch;
e. Areas classified as wetlands as defined by the Maine Natural Resources Protection Act,
Title 38 M.R.S. Sections 480-B, Definitions, as amended.
f.
Areas which have been created by filling or draining a pond or wetland;
g. Areas consisting of un-reclaimed gravel pits, unless the subdivision application includes a
reclamation plan;
h. Areas having slopes greater than twenty percent (20%);
i.
Areas having very poorly drained soils, and
j.
Areas subject to existing rights-of-ways or easements.
2. In addition, fifteen percent (15%) of the total acreage of the site remaining after subtracting those
areas listed above shall be deducted as an allowance for streets, parking and rights-of-way,
whether or not the actual area devoted to streets is greater or less than fifteen percent (15%).
However, the fifteen percent (15%) deduction shall not be subtracted when there are no streets
planned as part of a subdivision.
3. For determination of poorly and very poorly drained soils, soil classifications shall be developed
based upon high intensity soils mapping conducted by a certified soil scientist, in accordance
with the standards established by the Maine Association of Professional Soil Scientists and the
National Cooperative Soils Survey unless waived by the Planning Board. In cases where the
requirement of a high intensity soils map is waived by the Planning Board, deductions for
unsuitable soils shall be determined in the following manner: land areas with a water table within
4. Six (6) inches of the surface for three (3) or more months a year shall be deducted. In making this
determination, the Planning Board shall consider medium-intensity soils maps, perform site
visits, consult expert and review other available information as provided by the applicant.
5. Net Residential Density: Net residential density shall mean the number of dwelling units per
net residential acre.
D. Pocket Neighborhoods allow for the arrangement of a single building type around a common civic
space to promote greater density than otherwise allowed with the base district.
1. The purpose of a Pocket Neighborhood is:
a. To allow increased density without altering the underlying zoning.
b. To allow the creation of fine-grained civic space surrounded by buildings of the same type.
c. To enable a close arrangement of buildings that would not otherwise be possible.
Town of North Yarmouth Land Use Ordinance
Page 91 of 292
2. Pocket Neighborhoods must be designed to meet the following standards:
a. Pocket Neighborhoods consist of three elements; the building lots on which buildings are
placed, the civic space around which the building lots are arranged, and access areas which
may or may not include driveways, parking lots, and pedestrian walks.
b. Pocket Neighborhoods include one of the following three house types, subject Section X
10.4 Building Standards:
1) A cottage
2) A bungalow - The gable of the bungalow must not face the civic space
3) A townhouse
c. Pocket Neighborhoods do not contain garages.
d. The total frontage of a Pocket Neighborhood may not exceed 300 ft. in aggregate length
along any single thoroughfare.
e. Pocket Neighborhoods may not contain public or private thoroughfares, except that a new
public or private thoroughfare may be constructed adjacent to a pocket neighborhood to
provide frontage for the Pocket Neighborhood.
f.
Pocket Neighborhoods can be configured in one of three ways:
1) Corner-Courts are built on a corner-lot or are assembled from lots with combined
frontage on two intersecting thoroughfares.
2) Through-Courts are built on a through-lot or are assembled from lots to create a through
lot with frontage on two non-intersecting thoroughfares.
3) Interior-Courts are built on an interior lot or are assembled from lots to create a lot
with combined frontage on only one thoroughfare.
g. Parking lots within a Pocket Neighborhood may provide no more than one (1) parking
space per unit constructed within the Pocket Neighborhood. One additional parking space
per four (4) units may be provided for guest parking.
h. Parking within a Pocket Neighborhood must be set back from all abutting thoroughfares by
no less than thirty(30) feet with the exception of alleys.
i.
The civic space at the center of a Pocket Neighborhood must be at least twenty (20) ft.
wide on its shortest side and have an area not smaller than 1000 sf and not larger than
10,890 sf (1/4 acre).
j.
The civic space must be built to create a common, park, or square.
k. A civic space with four (4) or more sides must directly front a thoroughfare or alley on at least
one side and no more than two (2) sides.
l.
A civic space with three (3) sides must directly front a thoroughfare or alley on only one side.
m. A Pocket Neighborhood must consist of at least four (4) and no more than twenty (20) units
of the permitted building types.
n. No building may orient a rear wall towards the civic space or any thoroughfare, except alleys.
o. Building lots must meet the following lot measurement and building setback rather than for
the base zoning district:
Town of North Yarmouth Land Use Ordinance
Page 92 of 292
1) primary front setback of zero (0) ft. min - ten (10) ft. max, secondary front setback of zero
(0) ft. min - ten (10) ft. max; side setback five (5) - twenty-five (25) ft. max; rear setback five
(5) ft. min.
2) No building lot may be greater than five thousand (5,000) sf
p. Pedestrian walkways and sidewalks providing access within a pocket neighborhood court
may not exceed a width of ten (10) ft.
q. An access driveway must be between eight (8)- fourteen (14) ft in width.
Town of North Yarmouth Land Use Ordinance
Page 93 of 292
VIII.
GENERAL REQUIREMENTS: APPLICABLE TO ALL LAND USES
SECTION 8.1 PURPOSE AND APPLICABILITY
A. Purpose: The purpose of this Section is to encourage orderly growth and development, encourage
development design that minimizes road access points to public roads and retains access to back
land and protects the environment and adjacent properties.
B. Applicability: The provisions of this Section are applicable to all allowed and permitted land use
activities, including those activities that require permits from the Code Enforcement Officer (CEO) as
listed in Section III. Administration and Enforcement and Section VII. Zoning District Regulations,
Table 7-1. Land Uses by District. This Section (other than Section 8.4) is not applicable to land use
activities that require Site Plan Review or Subdivision Review pursuant to Section VII. Zoning District
Regulations, Table 7-1. Land Uses by District.
SECTION 8.2 UTILIZATION OF THE SITE
The plan for any development must reflect the natural capabilities of the site to support the development.
Buildings, lots and support facilities must be located in those portions of the site that have the most suitable
conditions for development. Environmentally sensitive areas, including but not limited to, wetlands, steep
slopes, 100-year floodplains, significant wildlife habitats and corridors, scenic areas, unique natural areas,
and significant groundwater aquifers must be maintained and preserved to the maximum extent. Natural
drainage areas must also be preserved to the maximum extent. A development must include appropriate
measures for protecting these resources, including but not limited to, modification of the proposed design
of the site, timing of construction, and limiting the extent of excavation.
SECTION 8.3 BACK LOTS AND STREET ACCESS REQUIREMENTS [AMENDED 6/19/21; 6/17/24]
A. Single- family dwellings, duplex dwellings and non-residential structures shall be permitted on back
lots provided they are served by a private right-of-way no less than fifty (50) feet wide, and subject
to the following conditions:
1. Back lots must be served by a right-of-way of at least fifty (50) feet in width. The street frontage
on the fifty (50) foot right-of-way serving a back lot shall not be included in calculating minimum
street frontage for the adjacent lots fronting on a street.
2. All residential and non-residential lots and other lots with buildings for human occupation shall
have adequate access roads for emergency vehicles to enter, turn around, and exit. (town's
Roadway Ordinance)
3. Where a lot is in existence and is provided by a private right-of-way recorded at the Cumberland
County Registry of Deeds prior to the adoption of this Ordinance (June 14, 2005), and expansion
of the right-of-way is not possible, a right-of-way of fifty (50) feet will not be required.
4. Private Roads Serving Three or More Residential Units and/or Non-residential Uses: This
subsection is applicable to situations that do not meet the definition of a subdivision. Any access
road serving three or more lots shall be constructed within a right-of-way with a minimum width
of fifty (50) feet, and with a minimum traveled way width meeting Table 2 in section 8.4 H.4 and
the town's Roadway Ordinance. Drainage culverts at the intersection of the access road and
the public street shall be no less than eighteen (18) inch aluminized corrugated metal pipe or
equivalent as determined by the Road Commissioner. The access road shall be built to
maintain a minimum depth also described in Table 2 in section 8.4 H.4 and the town's Roadway
Ordinance.
Town of North Yarmouth Land Use Ordinance
Page 94 of 292
5. In the Farm and Forest District, Residential Shoreland District and Resource Protection
District, back lots shall require a buildable lot containing no less than 4 acres for a single family
dwelling unit or non-residential principal structure, and no less than 6 acres for a duplex or two
non- residential principal structures, and a minimum lot width of 200 feet. No dwelling unit or
other principal structure shall be erected on a back lot closer than 250 feet to an existing public
street in these districts.
6. In the Village Center District and Village Residential District, residential back lots shall meet
the dimensional requirements for the District, and non-residential back lots shall be a minimum
of 1 acre in size.
7. In the Water District service area, the backlot owner may own the right-of-way in fee or by
easement. [Amended 6/18/11]
SECTION 8.4 DESIGN AND CONSTRUCTION STANDARDS FOR ROADS AND DRIVEWAYS [AMENDED
6/19/21]
A. Purpose Applications for new private roads after the effective date of this amendment shall not be
approved by the Code Enforcement Officer unless the proposed road construction meets the design
and other standards set forth town's Roadway Ordinance and Section 8.4, as applicable, including
the minimum roadway widths set forth in Table 8.2 in this section. However, if the applicant requests
waiver of the roadway width otherwise applicable to new private roads, the Planning Board may
apply a lesser roadway width per Table 8.2 to applications for new private roads after the effective
date of this amendment if the waiver standards set forth in this section have been met. On or after
the effective date of this amendment, applications for extensions of private roads in existence as of
the effective date of this amendment, are subject to this section, including Table 8.2 and the town's
Roadway Ordinance.
B. Classification.
Streets are classified according to the average daily traffic (ADT) they are intended to serve, as
calculated by the number of average daily trips, as follows:
1. Average daily trip. "Average daily trip" shall be defined as the anticipated number of daily vehicle
trips generated by a use as established by the Trip Generation Manual, published by the
Institute of Transportation Engineers, 1991. If the applicant disagrees with the estimated
number of trips per day generated by a particular use as listed by the Trip Generation Manual
published by the Institute of Transportation Engineers, then the applicant may request a waiver
of these standards if information is submitted demonstrating that the Trip Generation Manual
estimate is inaccurate. Table 1 lists the estimated number of average weekday trips for
residential uses.
Town of North Yarmouth Land Use Ordinance
Page 95 of 292
Table 8.1
Average Weekday Trip Generation Rates
Housing Type (trips per dwelling unit)
Single- family detached
10
Duplex, Townhouse, Apartments, Condominium, etc.
8
Mobile Home
5.5
Retirement Home
3.5
Arterial streets and highways serve primarily as major traffic ways for travel between and
through towns.
Private streets serve as feeders to access, sub collector, and collector residential streets and may be
the principal entrance streets of a residential development these streets are defined as having
(3) or more dwelling units or uses.
Residential access streets serve primarily for access to abutting residential properties and as feeders
to other residential streets of equal of greater capacity. Access streets are intended to serve
developments with average daily trips less than 199.
Residential sub collector streets serve as collectors from access or private streets and as feeders to
collector streets; they are intended to serve developments with average daily trips of two hundred (200)
to five hundred (500).
Residential Collector Street serve as collectors from sub collector streets and as feeders to arterial
streets; they are intended to serve developments with average daily trips greater than five hundred
(500).
Commercial access streets serve commercial and industrial developments with average daily trips
less than two thousand (2,000).
Commercial collector streets serve commercial and industrial developments with average daily trips
of two thousand (2,000) or more.
Classification of street types will be made by the Planning Board within the considerations outlined
above.
C. Layout
1. All streets in the subdivision shall be so designed that, in the opinion of the Planning Board,
they will provide safe vehicular travel while discouraging movement of through traffic over local
streets.
2. The arrangement, character, extent, width, grade and location of all streets shall be considered
in their relation to existing or planned streets, to topographical conditions, to public convenience
and safety, and their appropriate relation to the proposed use of the land to be served by such
streets. Grades of streets shall conform as closely as possible to the original topography.
3. In the case of dead-end streets, where needed or desirable, the Planning Board may require
the reservation of a minimum thirty-foot-wide utility easement and/or minimum twenty-foot-wide
right- of-way for pedestrian and/or bicycle traffic. The Planning Board may require that additional
right- of- way widths be provided if it determines that future extension of the street
Town of North Yarmouth Land Use Ordinance
Page 96 of 292
may occur. Such additional widths shall be consistent with the right-of-way width of the dead-
end street.
4. In front of areas zoned and designed for commercial use, or where a change of zoning to a
zone which permits commercial use is contemplated by the municipality, the street right-of-way
and/or pavement width shall be increased by such amount on each side as may be deemed
necessary by the Planning Board to assure the free flow of through traffic without interference
by parked or parking vehicles and to provide adequate and safe parking space for such
commercial or business district. In no case shall the street have a right-of-way width and
pavement width less than that specified in Table 2 and the town's Roadway Ordinance.
5. Where a subdivision borders on or contains a railroad right-of-way, the Planning Board
may require a street approximately parallel to and on each side of such right-of-way at a
distance suitable for the appropriate use of the intervening land, as for park purposes in
appropriate districts. Such distances shall also be determined with due regard for approach
grades and future grade separations.
6. Where a subdivision borders an existing narrow road (below standards set herein), the applicant
shall be required to show areas for widening or realigning such roads on the plan, marked
"Reserved for Road Realignment (or Widening) Purposes." Land reserved for such purposes
may not be counted in satisfying setback or yard or area requirements.
7. The extension or continuation of an existing street right-of-way less than that specified herein
may be permitted with the approval of the Planning Board.
8. The design of subdivision streets shall provide for the continuation of streets to and from
adjacent subdivisions and/or undeveloped land, where the Planning Board determines that
interconnection of streets is physically feasible and would contribute to the safety and function on
the street system. If connection to an existing street is not possible at the time of the subdivision,
a temporary dead end street shall end in a hammerhead turn-around designed in accordance
with the town's Roadway Ordinance. A right- of-way shall be extended from the hammerhead
turn-around to the neighboring property line for future extension. The right-of-way shall be
dedicated to the town. This shall be labeled "Future Street Extension" on all plans of the project
and noted in all deeds. Reserved street for future street connection to adjoining undeveloped
property shall be dedicated to the town. The developer of the adjoining property can be required
by the Planning Board to connect to and build over the reserved strips. Reserved strips not to be
used shall be dispensed with according to 23 M.R.S. Section 3027.
9. Entrances, either proposed driveways or streets, onto existing state aid or state highways must
be approved by the Maine Department of Transportation. Copies of such approval shall be
submitted to the Planning Board at the time of final review.
10. Utility location and type stall be shown on design drawings submitted and must be approved by
the responsible utilities. Copies of written approval shall be submitted to the Planning Board at
the time of final review.
11. If the Planning Board determines that future development will occur on land adjacent to or near
a proposed subdivision, whether it is owned by the applicant or not, then the Planning Board
shall retain the right to require the applicant to meet the requirements for collector street design
and construction as specified herein at no cost to the Town.
Town of North Yarmouth Land Use Ordinance
Page 97 of 292
D. Street signs and names.
1. Streets: Streets which join or are in alignment with streets of abutting or neighboring properties
shall bear the same name. Names of new streets shall not duplicate nor bear phonetic
resemblance to the names of existing streets within the Town and shall be subject to the approval
of the Planning Board with recommendations from Road Commissioner and Fire Rescue Chief.
2. Street name: signs shall be furnished and installed by the Town but appropriate fees charged
to the applicant to do so. The type, size and location shall follow the town's Roadway Ordinance.
3. Traffic control devices: The applicant shall furnish and place all appropriate signing and
pavement markings required for the proper control of pedestrian, bicycle and vehicular
traffic within the subdivision. The types and locations of all such devices shall be determined by
the Planning Board and Road Commissioner, if appropriate, and shall be in conformance with
the Manual on Uniform Traffic Control Devices, as currently revised.
4. Street lighting: The applicant shall coordinate with the appropriate servicing utility and the
Road Commissioner the locating and placing of any lighting. Light poles and luminaires shall be
a type approved by the Planning Board and said utility.
E. Design and construction standards.
All streets in the subdivision shall be designed and constructed to meet the following standards for
streets according to their classification, including whether urban or rural standards apply, as
determined by the Planning Board:
1. Urban: Urban standards shall apply to all roads that are constructed using subsurface drainage
and curbing. Urban standards may be applied to rural roads at the Planning Board's discretion
if conditions so warrant, such as topography, soil conditions and aesthetics. Urban design
standards shall be defined as paved streets with such appurtenances as curbs, esplanades, a
byway, and an enclosed storm drainage system with catch basins, manholes, and associated
piping.
a. The Planning Board shall require the provision of a byway under the urban design
standards, which for purposes of this subsection B(1) shall include only a sidewalk or free
walk; provided, however, that, a free walk may be substituted for a sidewalk if in the opinion
of the Planning Board such substitution will not significantly lessen drainage efficiency, or
the requirement of a byway may be waived altogether.
b. Road classifications as described in B(1) standards shall be used for all street designs in
the Town, except as specified above. Road design standards shall be defined as paved
streets with gravel shoulder, side ditches for the transportation of stormwater and a byway.
The Planning Board shall require the provision of a byway under the town's Roadway
Ordinance, which for purposes of this subsection B(1) shall include only a free walk or paved
shoulder; provided, however, a paved shoulder may be substituted for a free walk; or the
requirement of a byway may be waived altogether.
2. Rural: Rural design standards as set forth herein shall be used for all other streets not classified
under the urban street category. Rural shall be defined as paved or gravel streets with gravel
shoulders, side ditches and a byway unless a waiver is granted at the time of application from
the Planning Board.
Town of North Yarmouth Land Use Ordinance
Page 98 of 292
a. The Planning Board shall require the provision of a byway under the rural design standards,
which for purposes of this subsection D(2) shall include only a free walk or paved shoulder;
provided however a paved shoulder may be substituted for a free walk, or the requirement
of a byway may be waived altogether.
3. Dimensions of street construction: The dimensions for street construction shall be shown in
Table 8.2 and listed in the town's Roadway Ordinance.
4. Dead-end streets:
a. Presentation of special design, discussion and written permission by the Planning Board
shall be required for those conditions that may require dead-end streets under the category
of residential sub collector, residential collector, commercial access, or commercial collector.
b. The terminus of any dead-end street must have a cul-de-sac, with standards as listed below.
Other types of turnarounds may be approved by the Planning Board after receiving a
recommendation by the Fire/EMS Chief and Road Commissioner. Cul-de-sac island area
shall be restricted to pavement, or where the radius is large enough the Planning Board may
permit other cover types.
c. Standards as listed under Subsection b shall be applicable for dead-end streets. In addition,
the following requirements shall be fulfilled:
1) Maximum length of dead-end streets shall be limited to fifteen hundred (1,500) feet
measured from the center line of the feeder street to the center of the turnaround radius.
However, the Planning Board may allow longer lengths because of property
configuration and/or topographical constraints.
2) Radii at cul-de-sac with center island:
(a) Property Line: seventy (70) feet
(b) Outer edge of pavement: sixty (60) feet
3) Radii at cul-de-sac without center island:
(a) Property Line: sixty (60) feet
(b) Outer edge of pavement: fifty (50) feet
F. Roadway Construction Materials
1. General roadway construction materials as specified herein shall conform to the current
specifications of the Maine Department of Transportation.
a. Standards and dimensions tabulated herein shall be considered as minimum. The
applicant shall be required to investigate and determine the types and classifications of the
soils
1) Computations shall be made to determine pavement design standards for construction,
which shall be submitted to the Road Commissioner for review.
2) If the existing native soil through the subbase course area can be defined as being equal
in quality and thickness to the minimum requirements specified herein, the Planning
Board may waive a portion or all of the minimum requirements for subbase courses. In
any event, the ultimate density of any material left in place shall conform to
Town of North Yarmouth Land Use Ordinance
Page 99 of 292
the minimum requirements for compaction specified herein.
3) If, during construction, subsurface soils vary from the original classification, the pavement
design shall be modified to reflect the new soil types. Revised pavement designs shall be
submitted to a third party engineer for approval at the owner's expense.
4) All aspects of work using geo-textile shall be in conformance with MDOT.
2. Materials
a. The minimum thickness of the various materials courses shall be shown in Table 8.2
b. Curbing materials shall be either granite stone curbing, Type 1, or bituminous curbing, Type
3. Type 1 vertical circular curbing shall be used for radii at intersections.
G. Construction specifications.
All streets within a subdivision shall be constructed according to the specifications herein as
overseen by the Road Commissioner.
1. Grading: All streets shall be graded to their full width by the applicant so that pavements and
sidewalks can be constructed on parallel profiles. Due to special topographical conditions,
deviation from the above will be allowed only with approval of the Planning Board.
a. Preparation. Before grading is started, the entire right-of-way area shall be cleared of all
stumps, roots, brush, and other objectionable material and all trees not intended for
preservation.
b. Cuts: Tree stumps, roots, and other organic materials shall be removed to a depth of two
feet below the subgrade. Rock and boulders, when encountered, shall be removed to
subgrade.
c. Fill: All materials used in the construction of embankments shall meet the standards for
embankment construction, Sections 203.09 through 203.16 of the Maine Department of
Transportation Standard Specifications. Excess material, including organic materials, etc.,
shall be removed from the street site. The fill shall be spread in layers not to exceed 12 inches
loose and compacted. The filling of utility trenches and other such areas shall be
mechanically tamped.
d. All underground utilities and their services shall be installed within the street right-of-way
prior to placement of the aggregate base course (crushed gravel).
e. Side Slopes: All side slopes shall be a maximum slope of three horizontal to one vertical.
All slopes shall be graded, loamed (four inches compacted), fertilized, limed and seeded as
required.
2. Bases and Pavement
a. The appropriate sections of the bases and pavements divisions of the Maine Department of
Transportation Standard Specifications in effect at the date of submission of the application
shall be applicable.
Town of North Yarmouth Land Use Ordinance
Page 100 of 292
b. Bases:
1) Aggregate subbase course: gravel (Type D). Aggregate subbase shall not contain
particles of rock exceeding six inches in any dimension.
2) Aggregate base course: crushed (Type A). Aggregate base shall not contain particles of
rock that will not pass a two-inch-square mesh sieve.
3) Where pavement placed joins an existing pavement, the existing pavement shall be cut
along a smooth line and to a neat, even, vertical, joint. Broken or raveled edges will not
be permitted, nor deviation from grade.
4) Gradation of aggregates for plant mix hot bituminous pavements shall be as specified in
Division 700 of the Maine Department of Transportation Standard Specifications.
3. Curbing.
Section 609 of the Maine Department of Transportation Standard Specifications shall be
applicable, except as follows:
a. Curbing shall be limited to Type 1 and Type 3.
b. Vertical or sloped curbing shall be used in accordance with the design standards set forth
herein for the particular type of street. All curbs shall have a typical reveal of six (6) inches.
c. Type 1 curbing shall be used for radii at all intersections unless waived by the Planning
Board.
4. Byways.
a. Sidewalk: Sidewalk construction shall comply with Section 608 of the Maine Department of
Transportation Standard Specifications. Sidewalks shall have typical cross slopes of 3/8
inch per foot.
b. Free walk: A free walk shall be four feet wide, shall consist of two-inch-thick asphalt with
an eight- inch gravel subsurface and shall be separated from the paved portion of the road
by a grassy esplanade with a minimum width of four feet.
c. Paved shoulder: A paved shoulder shall be constructed to the same road construction
materials standards as the adjoining road. The paved shoulder shall be contiguous with the
roadbed and shall be separated from the roadway by a painted, solid white line.
5. Monuments: All lot corners shall be marked with iron pipe not less than one inch in diameter
and 48 inches long and driven so as to be flush with the finished grade.
H. Private Streets
1. The private street application shall be accompanied by a plan showing the private street(s),
which plan shall be prepared by a registered land surveyor. The plan shall be drawn in
permanent ink on permanent transparency material and shall be sealed by the surveyor
preparing the plan. The plan shall be labeled "Plan for a Private Street" and shall provide an
approval block for the signature of the Code Enforcement Officer or Planning Board if waivers
are requested, the date of the approval, and the words "Private Street, Approved by the Town
of North Yarmouth." The plan shall show information sufficient to establish on the ground the
Town of North Yarmouth Land Use Ordinance
Page 101 of 292
exact location, direction, width, and length of the private street. Where a proposed private street
contains severe slopes, stream crossings, or a significant amount of cut and fill, the applicant
shall also provide a profile of the street. In addition, a street plan and cross section shall be
submitted for each new private street serving three or more dwelling units. The plan shall also
contain a note which shall read: "The Town of North Yarmouth shall not be responsible for the
maintenance, repair, plowing, or similar services for the private street shown on this plan." The
original plan(s) shall be recorded in the Cumberland County Registry of Deeds within 90 days
of approval of the plan of the private street, and proof of such recording shall be submitted to
the Code Enforcement Officer prior to the issuance of any building permit. If the plan is not
recorded within this period, the approval shall be void.
2. If the private street provides access to three or more dwelling units, the applicant shall prepare
a maintenance agreement and shall submit this as part of the application. This maintenance
agreement shall specify the rights and responsibilities of each lot owner with respect to the
maintenance, repair and plowing of the private street. The applicant shall record this
maintenance agreement in the Cumberland County Registry of Deeds within 90 days of approval
of the plan of the private street by the Code Enforcement Officer or Planning Board and shall
submit proof of such recording to the Code Enforcement Officer prior to the issuance of any
building permit. Deeds to new lots located on private streets servicing three or more dwelling units
shall include references to the required maintenance agreement.
3. Private streets shall have a minimum right-of-way width of 50 feet and a paved apron at least
twenty feet in length commencing at the edge of pavement where it intersects with existing
street unless existing street is unpaved. The paved apron shall be constructed to the following
standards.
a. Fifteen inches of base gravel meeting MDOT Spec. 703.06 Type D.
b. Three inches of surface crushed gravel meeting MDOT Spec. 703.06 Type A.
c. The thickness of paving of the apron shall be a total thickness of three inches of hot bituminous
pavement, with a surface course (Grading "C") of one inch and a base course (Grading "B")
of two inches.
d. A negative two-percent grade from the existing edge of pavement to an appropriate drainage
way, but in no case less than five feet from the travel surface of the public street it intersects.
e. Approach radius shall be specified by the Road Commissioner.
4. Private streets Table 8.2
The construction of private streets shall meet the following minimum standards: All newly
created Private Streets, after the adoption of this ordinance must meet the dimensional standards
of column 3 unless granted a waiver through the Planning Board.
Town of North Yarmouth Land Use Ordinance
Page 102 of 292
Table 8.2
Number of Dwelling Units Served
1
2
3
Minimum roadway width (feet)
3 to 5
16*
6 to 10
18*
11 or more
Minimum base (inches)
18
18
18
Wearing surface (inches) - Gravel
6
6
6
Wearing surface (inches) - Paving
2
2
2
Maximum length
None
None
None
Maximum grade
10%
10%
10%
Minimum grade
0.5%
0.5%
0.5%
Minimum center-line radius (feet)
100
100
100
Minimum tangent between curves
of reverse alignment (feet)
50
50
50
Minimum angle at street
intersections
60°
60°
60°
Turnaround at dead end
T
T
T
* For columns 1 and 2 in Table 8.2:
1)
Vehicle turnout(s) or turnaround providing space for two vehicles to pass or turnaround shall be
specified by the Road Commissioner/Code Enforcement Officer if necessary due to the length of
the private way or configuration of the travel way.
2)
Existing private streets must conform to the chart as the number of residences increases on the
private street working from the last residence to the start of the private street.
a. Where a proposed private street will be located adjacent to lots with existing structures that
are not part of the development that will be served by the proposed private street, the
traveled portion of the private street shall be located in a manner that retains an
undeveloped portion of the street adjacent to the existing structures, with such undeveloped
portion including an effective landscaped buffer.
b. Private streets shall be inspected by the Road Commissioner or Code Enforcement officer,
unless it is determined physical conditions such as stream crossings or wetland areas require
inspection by a registered professional engineer or other qualified land use professional.
Prior to the issuance of building permits for lots served by a private street, the Road
Commissioner shall certify to the Code Enforcement Officer that the private street(s) has
been constructed in accordance with this section. The applicant shall be responsible for the
cost of each inspection by a registered professional engineer.
c. Fees.
1) To help recover costs incurred by the Town in the review, administration, site inspection,
and public notice associated with the private street application, at the time
Town of North Yarmouth Land Use Ordinance
Page 103 of 292
of filing the private street application, the applicant shall pay to the Town fees and
deposits in such amount(s) and for such purpose(s) as the Select Board may from time
to time establish.
d. The Code Enforcement Officer and the Road Commissioner shall review and approve
applications for private streets in writing to ensure they meet all standards when they do not
trigger a Planning Board review. Such decisions may be appealed by filing a written notice
of appeal stating the reasons therefor with the North Yarmouth Zoning Board of Appeals
within 30 days of the date of decision.
e. The provisions of this section shall not apply to private roads within a mobile home park.
I.
New and Existing Private Road Waiver Requirements: The Planning Board may waive
private road requirements if the following items apply:
1. The applicant can provide substantial proof to the Planning Board that the road being
constructed on the parcel being developed can never and will never be expanded in any
manner due to a unique situation and the proposed road can serve the developed property
and its full potential.
2. The waiver, if granted, does not and will not adversely affect the continuing development of
community or surrounding parcels of land as a direct result of the waiver.
3. A 20' roadway would have a negative environmental impact on the property being developed
or surrounding properties. This item must be supported by a design professional.
4. A waiver will be limited to road width and dimensional standards per Table 2 of this section.
5. This applies to all private streets proposed to be created after the effective date of this
amendment and to existing private streets upon which one more new dwelling units are
proposed to be constructed after the effective date of this amendment.
J. Road and Driveway Entrances
1. Applicability: No person may build or construct a driveway or road that provides access to a
public road without first obtaining a Driveway/Road Entrance Permit from the Code
Enforcement Officer in accordance with this section. Any driveway or road serving a
subdivision or development listed in Section VII. Zoning District Regulations, Table 7-1. Land
Uses by District as requiring Site Plan Review must meet the requirements of Section VIII
& X.
2. Maine Department of Transportation (MDOT) Permit: A copy of a MDOT Driveway or
Entrance Permit, if applicable, must be presented with any application for a town
Driveway/Road Entrance Permit.
3. Safe Sight Distances:
a. Access shall be designed in profile and grading and located to achieve the required sight
distance measured in each direction along the public road while maintaining adequate
distances
from
adjacent
driveways/roads
and
intersections.
1) Sight distance is measured to and from the point on the centerline of the proposed
access that is located ten (10) feet from the edge of traveled way. The height of
Town of North Yarmouth Land Use Ordinance
Page 104 of 292
the hypothetical person's view is considered to be three and a half (3½) feet above
the payment and the height of the object being viewed is considered to be four and
a half (4½) feet above the pavement.
b. Driveway/ road and intersection road placement shall be such that an existing vehicle
has an unobstructed sight distance according to the following schedule:
Table 8.3
Safe Sight Distances
Highway Speed (MPH)
Minimum Sight Distance (Feet)
20
155
25
200
30
250
35
305
40
360
45
425
50
495
55
570
60
645
Source: MDOT Access Management Standards
4. Site triangle shall be maintained twenty five (25) feet in length on each side of the intersection
of the driveway and the Public Street or road right-of-way line, with the third side connecting the
other two sides. Within each sight triangle, no landscape plants, trees, other than low growing
shrubs shall be planted. These shrubs must be no more than thirty (30) inches in height above
the driveway elevation. Signage must not obstruct the view of oncoming traffic.
5. Access Management and Safety Standards. Driveway/ road and private-right-of-way access
points to public road shall be limited as follows:
a. Points of access and egress must be located to avoid hazardous conflicts with existing
turning movements and traffic flows.
b. The number of access/egress points to a public road (each side of the public road
treated separately) shall be as follows:
1) Limited to one access/egress point for every two hundred (200) feet or one access point
per lot, in the Farm and Forest District, Residential Shoreland District and
Resource Protection District, whichever is less.
2) Limited to one access point for every one hundred and fifty (150) feet, or one access
point per lot in the Village Center District and Village Residential District, whichever
is less.
Town of North Yarmouth Land Use Ordinance
Page 105 of 292
c. Shared Driveways/Roads: Shared driveways/roads shall be encouraged for adjacent
sites, in order to minimize the number of driveways along public roads. The CEO may allow
for a reduction in the minimum frontage requirement by 10 percent when the applicant
agrees to provide a common driveway/right-of-way for multiple lots and/or uses.
d. Corner Lot Access: Where a lot has frontage on two or more streets, the access/egress to
the lot shall be provided to the lot across the frontage and to the street where there is lesser
potential for traffic congestion and for hazards to traffic and pedestrians. This requirement
may be waived where the applicant demonstrates that existing site conditions preclude the
location of the driveway to the street where there is lesser potential for traffic congestion and
for hazards to traffic and pedestrians, or that the location of the driveway/road to the street
where there is lesser potential for traffic congestion and for hazards to traffic and pedestrians
would negatively impact a predominately residential neighborhood.
e. Driveway Turn-Around Area: After the effective date of this Ordinance (June 14, 2005),
all future driveways/roads shall be designed with sufficient vehicle turn-around area to
enable a driver to exit the premises without backing into the public street.
f.
Driveway or Road Grades: The grade of any proposed driveway or road must be not more
than ±3 percent for a minimum of forty (40) feet, from an intersection.
g. Access way Location and Spacing: Access ways must meet the following requirements:
1) New public and private accesses/egresses must be located at least fifty (50) feet from the
closest unsignalized intersection and one hundred and fifty (150) feet from the closest
signalized intersection, as measured from the point of tangency for the corner to the point
of tangency for the access way. This requirement may be reduced if the shape of the
site does not allow conformance with this standard and the applicant demonstrates a
hardship as required in 5.g.3) below.
2) New public and private accesses/egresses must be located at least fifty (50) feet from
existing private roads, as measured from the point of tangency for the corner to the point
of tangency for the access way. This requirement may be reduced if the shape of the site
does not allow conformance with this standard and the applicant demonstrates a
hardship as required in 5.g.3) below.
3) Demonstration of Hardship: The Planning Board may approve a reduction in the
access/egress way location and spacing requirements in 5.g.1) and 2) above when the
applicant demonstrates that the shape of the lot and the location of existing roads does
not allow conformance with the standards, and that there is no other alternative other
than a reduction in the access way location and spacing requirements. The applicant
must submit a site plan, done to scale, that demonstrates that all alternatives for meeting
these requirements have been explored and that without a reduction in the location and
spacing, driveway access would not be possible.
SECTION 8.5 EROSION AND SEDIMENTATION CONTROL
All site alterations must harmonize with existing topography and conserve desirable natural surroundings
to the fullest extent possible, such that filling, excavation and earth moving activity must be kept to a
minimum. Natural vegetation must be preserved and protected wherever possible. Erosion of soil and
sedimentation of watercourses and water bodies shall be minimized by employing the best management
practices of the "Maine Erosion and Sediment Control Handbook for Construction: Best Management
Town of North Yarmouth Land Use Ordinance
Page 106 of 292
Practices" by the Cumberland County Soil and Water Conservation District, most recent edition.
SECTION 8.6 SEWAGE DISPOSAL
All subsurface sewage disposal systems shall be installed in conformance with the State of Maine
Subsurface Wastewater Disposal Rules (Rules). The applicant shall submit evidence of site suitability for
subsurface sewage disposal prepared by a Maine Licensed Site Evaluator in full compliance with the
requirements of the Rules. When sewage disposal is to be accomplished by sub-surface sewage disposal
systems, test pit analysis, prepared by a licensed Site Evaluator shall be provided. A map indicating the
location of all test pits dug on the site shall be submitted.
SECTION 8.7 SIGNS [AMENDED 5/17/08; 6/17/24]
A. General requirements.
a. The size, location, design, color, texture, lighting and materials of all exterior signs and outdoor
advertising structures or features shall not detract from the design of proposed buildings and
structures and the surrounding properties and shall not constitute hazards to vehicles and
pedestrians. All materials, illumination colors, lettering styles, locations of signs on the site or
building shall be consistent with and proportional to the structures on the site. Signs shall be
located so as not to create a hazard or impediment to visibility, particularly at intersections.
[Amended 6/18/11]
B. Specific requirements.
1. In the Village Center District signs should be compatible with the village character, and placed
on the building, unless the sign would not be reasonably visible from the road in which situation
a freestanding sign is an option.
2. Signs in the Resource Protection District and the Residential Shoreland District shall also
meet the requirements in Section 9.1 Residential Shoreland District and Resource Protection
District Performance Standards.
3. Signs shall relate to the premises on which they are located and shall only identify the occupant
of the premises or advertise the service available within the premises.
4. No signs shall be erected prior to obtaining a permit.
5. Signs for each building, or single business with multiple buildings shall be no larger than twenty-
four (24) square feet in area.
6. Signs shall not be installed above the roofline of a building. The top edge of any freestanding
sign shall not be higher than twenty (20) feet vertical measure above the grade of the street
nearest the sign support(s).
7. For traffic safety, where vision may be obscured entering a public or private road, the whole of
the sign board or display elements of any freestanding sign shall be either below three (3) feet
in height or above then (10) feet in height of the road grade. A freestanding sign may be located
within the front yard space, but as not to create a traffic hazard. Freestanding signs shall not be
located within the street right-of-way.
8. Any sign that is attached to a structure, which overhangs a pedestrian walkway or public
sidewalk, shall not extend beyond 5 feet of the structure face to which it is attached.
9. All signs shall be properly maintained. Any sign now or hereafter existing that no longer
advertises a bona fide business conducted, an activity or campaign, shall be taken down and
Town of North Yarmouth Land Use Ordinance
Page 107 of 292
removed by the owner, agent, or person having the beneficial use of the building structure, or
lot. Within ten (10) days after written notification from the CEO and, upon failure to comply with
such notice within the time specified in such order, the CEO is hereby authorized to cause
removal of such sign, and any expense incident thereto shall be paid by the owner of the building,
structure, or lot to which such sign is attached.
10. Signs may be illuminated by shielded, non-flashing, non-moving lights. Internally illuminated
signs are prohibited. All lighting must be angled and shielded so that it does not directly illuminate
adjacent properties. All exterior lighting (including signage lighting) shall be turned on no earlier
than one hour before opening of business and turned off no later than one hour after the closing
of business, except for necessary security lighting approved by the CEO or Planning Board. All
lighting shall comply with the standards set forth in Section 10.9 Exterior Lighting.
11. Home Occupation Signs: Signage shall be limited to one sign identifying the name. address
and profession of the home occupation, providing that the sign does not exceed four (4)
square feet in area, is non-illuminated, and is mounted either flat against the wall of the
principal building or on a post, providing the sign does not extend into the public road limits.
Signs, exterior displays and any other indications of a home-based occupation in a residential
zone require conditional use approval by the Planning Board [Amended 5/30/09].
C. Exempt signs: The following temporary signs shall not require a permit or other approval:
1. Special Event Signs: Special event signs shall be allowed with written permission from the
property owner as long as these signs are erected no sooner than four (4) weeks prior to the
event being advertised. All special event signs must be removed within one week following the
event being advertised. Such signs shall be located and erected so as not to create a traffic
hazard.
2. Contractor signs: One sign each for a building contractor, architect or engineer, each sign shall
not exceed sixteen (16) square feet, relating to construction projects. Such sign shall be
removed within one (1) week after construction is complete.
3. Subdivision marketing signs: Subdivisions may have one non-internally lit sign at each public
entrance to the development not to exceed thirty-two (32) square feet per sign.
4. Real estate signs: One sign not exceeding sixteen (16) square feet relating to the sale, rental
or lease of the premises. Such sign shall be removed within one (1) week after the completion
of the property transaction.
5. Political signs are allowed in accordance with State law, except as follows: political signs are
prohibited from being placed on the following Town owned properties: Town Office- located at
10 Village Square Road - tax map 7 lot 64; Fire Station - located between Routes 9 & 115 (463
Walnut Hill Road and Memorial Highway) - tax map 7 lot 66; Public Works Garage- located at
40 Parsonage Road- tax map 7 lots 84 & 92; Wescustogo Hall - located at 475 Walnut Hill
Road tax map 7 lot 64: Veterans Memorial Park - located at the corner of Memorial Highway
and Parsonage Road - tax map 7 lot 76.
D. Nonconforming Signs: All nonconforming signs may continue to be used and maintained. When
nonconforming signs are replaced, they must be replaced with signs that conform to all
requirements in this section of the ordinance.
E. Maintenance and basis for revocation: All signs shall be properly maintained. The CEO may revoke
any permit for a sign not properly maintained. Any signs not properly maintained, any sign now or
hereafter existing that:
Town of North Yarmouth Land Use Ordinance
Page 108 of 292
1. no longer advertises a bona fide business conducted,
2. an activity or campaign,
3. or is not exempt or a permitted non-conforming sign,shall be taken down and removed by
the owner, agent, or person having the beneficial use of the building structure, or lot. Within ten
(10) days after written notification from the CEO that such sign should be removed, and, upon
failure to comply with such notice within the time specified in such order, the CEO is hereby
authorized to cause removal of such sign, and any expense incident thereto shall be paid by
the owner of the building, structure, or lot to which such sign is attached.
SECTION 8.8 STORM WATER CONTROL
All new site alterations shall be designed to minimize storm water runoff from the site in excess of the
natural pre-development conditions. Adequate provisions must be made for the collection and disposal of
all storm water that runs off proposed driveways, parking areas, roofs, and other surfaces to prevent
adverse impacts on abutting or downstream properties. Existing runoff control features, such as berms,
swales, terraces and wooded areas shall be retained where they reduce runoff and encourage infiltration
of storm water. Storm water runoff control systems shall be maintained to ensure proper functioning.
SECTION 8.9 WATER QUALITY [AMENDED 6/17/24]
A. Water Quality: No activity shall deposit on or into the ground or discharge to the waters of the state
any pollutant that, by itself or in combination with other activities or substances, will impair designated
uses, including existing and potential groundwater supplies, or the water classification of the water
body. No person shall locate, store, discharge, or permit the discharge of any treated, untreated, or
inadequately treated liquid, gaseous, or solid materials of such nature, quantity, obnoxiousness,
toxicity, or temperature that may run off, seep, percolate, or wash into surface or groundwaters so
as to contaminate, pollute, or harm such waters or cause nuisances, such as objectionable shore
deposits, floating or submerged debris, oil or scum, color, odor, taste, or unsightliness or be harmful
to human, animal, plant or aquatic life.
B. Groundwater Protection Overlay District: All development and land use activities located within
the Groundwater Protection Overlay District shall comply with the Section 9.2. Groundwater
Protection Overlay District: Best Management Standards.
C. Groundwater: Land use activities must not adversely impact either the quality or quantity of groundwater
available to abutting properties or to public water supply systems. Applicants whose projects involve on-
site water supply or sewage disposal systems with a capacity of two thousand (2,000) gallons per day
or greater must demonstrate that the groundwater at the property line will comply, following
development, with the standards for safe drinking water as established by the State of Maine. Ground
water withdrawals by proposed land use activities shall not lower the water table beyond the boundaries
of the development in a way that would impair or significantly diminish the permissible use of
groundwater on land outside the development.
D. Wellhead Protection: No activity shall be sited so as to contaminate or otherwise negatively impact
public or private water supplies. Proposed uses, such as junkyards, automobile graveyards, bulk
storage of petroleum products, automobile repair and service stations must be located at least five
hundred (500) feet from existing private and public water supplies. Underground fuel storage tanks
must be located one thousand (1,000) feet from public water supply wells, and septic systems must
be located at least three hundred (300) feet from public water supply wells. Any uses proposed to
be located within the Groundwater Protection Overlay District must comply with the requirements
of Section 9.2. Groundwater Protection Overlay District: Best Management Practices.
Town of North Yarmouth Land Use Ordinance
Page 109 of 292
SECTION 8.10 WELLS
Individual wells shall be sited and constructed to prevent infiltration of surface water, and contamination
from subsurface wastewater disposal systems and other sources of potential contamination. Lot design
shall permit placement of wells and subsurface wastewater disposal areas in compliance with the Maine
Subsurface Wastewater Disposal Laws. Due to the increased chance of contamination from surface water,
new dug wells shall be prohibited on lots of smaller than one acre, unless evidence is presented by a
certified hydrogeologist or similar expert assuring that a dug well can be safely utilized on the lot. New dug
wells shall not be constructed within one hundred (100) feet of the traveled way of any public road if
located downhill (where the average gradient is in excess of three percent [3%]) from the public road, or
within fifty (50) feet of the traveled way of any public road if located uphill of the public road. This restriction
shall be included as a note on the plan and deed restriction to the effected lots.
SECTION 8.11 ANIMAL HUSBANDRY
A. Standards: Animal husbandry for commercial purposes (see Section XII. Definitions) shall meet
the following requirements:
1. Uncovered storage of manure shall be kept one hundred fifty (150) feet from the nearest
residential dwelling other than the dwelling associated with the animal husbandry operation,
and three hundred (300) feet from any body of water or well.
2. Animal husbandry operations established after June 14, 2005: When a new animal
husbandry operation is established after June 14, 2005 in an area within 150 feet of a residential
dwelling that was in existence prior to June 14, 2005, the Planning Board may limit
the number and species of animals permitted and/or require a Nutrient Management Plan if there
are complaints regarding the handling of manure, noise, odor and/or vermin problems. The
Planning Board shall consider the size and layout of the lot, the size of adjacent lots, the
presence of vegetative screening and buffer strips, and the potential for noise, odor and vermin
problems.
B. Groundwater Protection Overlay District: Within the Groundwater Protection Overlay District,
animal husbandry shall also meet the following requirements:
1. A Nutrient Management Plan must be provided for all farming activities. Such a plan shall
describe how animals will be kept within the area, (the number of animals will in any case not
exceed 25 animal units (1 unit =1000 lbs of live animal weight) per ten (10) acres of land), or
how manure will be spread (no more than fifty (50) tons of manure to be used per ten (10) acres).
2. Application of manures shall be tailored to the specific needs of the crop, as determined by soil
suitability analyses.
3. Manures shall not be applied over very shallow soils (less than one (1) foot) or exposed bedrock.
4. Manure shall not be applied on frozen ground, or immediately before storm events.
5. Animal husbandry operations shall be pursuant to Section 9.2 Groundwater Protection Overlay
District: Best Management Practices.
SECTION 8.12 FLOODPLAIN MANAGEMENT [AMENDED 6/17/24]
A. If any portion of the sire is located within a 100-year floodplain area as identified by the Federal
Emergency Management Agency (FEMA) on the Flood Insurance Rate Maps and the Flood Hazard
Town of North Yarmouth Land Use Ordinance
Page 110 of 292
Boundary Maps (most recent versions), all use and development of that portion of the site must be
consistent with the town's Floodplain Management Ordinance.
B. Building Prohibited on Floodplains:
1. Buildings are prohibited within the 100-year floodplain area as identified by FEMA on the town's
Flood Insurance Rate Maps and Flood Hazard Boundary Maps. Identification of the 100-year
floodplain shall be in accordance with the North Yarmouth Floodplain Management Ordinance.
2. The development plan should include a statement that building is prohibited on the 100-year
floodplain, and the restriction shall be included in any deed, lease, purchase and sale
agreement, or document transferring or expressing intent to transfer any interest in real estate
or structure.
3. 100-year floodplains may be used as woodlands, grasslands, pastureland and for passive
outdoor recreation.
4. Piers, docks, wharves, bridges and boat ramps and associated parking are permitted within the
100-year floodplain pursuant to Section 9.1. Residential Shoreland District and Resource
Protection District Performance Standards subsection E, and the town's Floodplain
Management Ordinance.
Town of North Yarmouth Land Use Ordinance
Page 111 of 292
IX.
SPECIAL DISTRICT STANDARDS
SECTION 9.1 RESIDENTIAL SHORELAND DISTRICT AND RESOURCE PROTECTION DISTRICT
PERFORMANCE STANDARDS [AMENDED 5/17/08;6/19/21]
A. Purpose: The purpose of these standards is to further the maintenance of safe and healthful
conditions; prevent and control water pollution; protect fish spawning grounds, aquatic life, bird and
other wildlife habitat; protect buildings and lands from flooding and accelerated erosion; protect
archaeological and historic resources; protect wetlands; control building sites, placement of structures
and land uses; conserve shore cover, and visual as well as actual points of access to inland waters;
conserve natural beauty and open space; and anticipate and respond to the impacts of development
in shoreland areas. These districts are established in accordance with the provisions of 38 M.R.S.
Section 435 et seq. (Maine Mandatory Shoreland Zoning Act).
B. Applicability: Land use activities shall be reviewed on accordance with Section VII. Zoning District
Regulations. All land use activities within the Residential Shoreland District and the Resource
Protection District shall conform to the following provisions, if applicable.
C. Review Criteria: In approving any complete application, the permitting authority must make a
positive finding based on the information presented that the proposed use:
1. Will maintain safe and healthful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface waters;
3. Will adequately provide for the disposal of all wastewater;
4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife
habitat;
5. Will conserve shore cover and visual, as well as actual, points of access to waters bodies;
6. Will protect archaeological and historic resources as designated in the Comprehensive Plan;
7. Will avoid problems associated with flood plain development and use; and
8. Is in conformance with all provisions of this Ordinance.
D. Land Uses: See Section VII. Zoning District Regulations Table 7.1. Land Uses by District.
E. Maine Department of Environmental Protection Permits: A person performing any of the
following activities shall require a permit from the Department of Environmental Protection, pursuant
to 38 M.R.S., Section 480-C, if the activity occurs in, on, over, or adjacent to any wetland, river,
stream or brook and operates in such a manner that material or soil may be washed into them:
1. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
2. Draining or otherwise dewatering;
3. Any construction or alteration of any permanent structure.
Town of North Yarmouth Land Use Ordinance
Page 112 of 292
F. Minimum Lot Standards:
1. The following minimum lot area and minimum shore frontage standards shall be applicable
to permitted uses within the Residential Shoreland District and Resource Protection District:
Land Uses (Where permitted)
Minimum
Lot Area
Minimum
Shore Frontage
Residential - per dwelling unit
3 acres
200 feet
Governmental, Institutional, Commercial
or Industrial - per principal structure*
3 acres
300 feet
Public and Private Recreational Facilities
3 acres
200 feet
*Most commercial and industrial uses are prohibited within the Residential Shoreland and Resource Protection
Districts. See Section VII. Zoning District Regulations, Table 7.1. Land Uses by District.
2. The following shall also apply:
a. Land beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area. In addition, the following areas shall not be included toward calculating
minimum lot area: (1) land below the normal high-water line of the Royal River, Chandler
Brook and the East Branch; (2) land below the high-water line of those sections of Toddy
Brook, Pratt's Brook, Deer Brook and the unnamed tributary to Chandler Brook; and (3) land
below the upland edge of Knight's Pond or the Deer Brook Wetland.
b. Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of the land
on both sides thereof after September 22, 1971.
c. The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high water line of the Royal River, Chandler Brook, the East Branch,
or the sections of Toddy Brook, Deer Brook, Pratt's Brook or the unnamed tributary to
Chandler Brook, or within one hundred (100) feet, horizontal distance, of the upland edge
of Knight's Pond or the Deer Brook wetland, shall be equal to or greater than the shore
frontage requirement for a new lot with the proposed use.
d. If more than one residential dwelling unit, principal governmental, institutional, commercial
or industrial structure, or use, or combination thereof, is constructed or established on a
single parcel, all dimensional requirements shall be met for each additional dwelling unit,
principal structure, or use.
G. Principal and Accessory Structures:
1. All new principal and accessory structures shall be set back at least two hundred and fifty (250)
feet, horizontal distance, from the normal high-water line of the Royal River, Chandler Brook and
the East Branch, except for structures, roads, parking spaces or other regulated objects
specifically allowed in which case the setback requirement shall be one hundred (100) feet,
horizontal distance from the normal high water line. All new principal and accessory structures
shall be set back at least one hundred and fifty (150) feet, horizontal distance, from the normal high-
water line of the sections of Deer Brook, Toddy Brook, Pratt's Brook and an unnamed tributary
to Chandler Brook, at least one hundred and fifty (150) feet, horizontal distance, from the upland
edge of Knight's Pond and the Deer Brook wetland; and at least one hundred (100) feet,
horizontal distance, from the normal high-water line of tributary streams. In addition, these
setback provisions shall neither apply to structures that require direct access to the
aforementioned bodies of water as an operational necessity, such as piers, docks and retaining
walls, nor to other functionally water- dependent uses.
2.
Town of North Yarmouth Land Use Ordinance
Page 113 of 292
2. Principal or accessory structures and expansions of existing structures that are permitted shall
not exceed thirty (35) feet in height. This provision shall not apply to structures such as
transmission towers, windmills, antennas, and similar structures having no floor area.
3. Principal and accessory structures are prohibited within the 100-year floodplain as identified by
the Federal Emergency Management Agency. Expansions of existing structures within the 100-
year floodplain are prohibited.
4. The total footprint of all structures, parking lots and other non-vegetated surfaces, within the
these districts shall not exceed twenty (20) percent of the lot or a portion thereof, including land
area previously developed.
5. Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the CEO, to provide shoreline access in areas of steep slopes or unstable
soils provided: that the structure is limited to a maximum of four (4) feet in width; that the
structure does not extend below or over the normal high-water line of a water body1 or below or
over the upland edge of the Deer Brook wetland or Knight's Pond, (unless permitted by the
Department of Environmental Protection pursuant to the Natural Resources Protection Act, 38
M.R.S., Section 480-C); and that the applicant demonstrates that no reasonable access
alternative exists on the property.
H. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within the Deer Brook Wetland or Knight's
Pond:
1. Access from shore shall be developed on soils appropriate for such use and constructed so as
to control erosion.
2. The location shall not interfere with existing developed or natural beach areas.
3. The facility shall be located so as to minimize adverse effects on fisheries.
4. The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or wharf
shall not be wider than six (6) feet for non-commercial uses.
5. No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water as an operational necessity.
6. New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the
Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained
from the Department of Environmental Protection, pursuant to the Natural Resources Protection
Act.
7. No existing structures built on, over or abutting a pier, dock, wharf or other structure extending
beyond the normal high-water line of a water body or within a wetland shall be converted to
residential dwelling units in any district.
8. Structures built on, over or abutting a pier, wharf, dock or other structure extending beyond the
normal high-water line of a water body or within a wetland shall not exceed twenty (20) feet in
height above the pier, wharf, dock or other structure.
1 Water Body: Any river or stream with Resource Protection zoning to include the Royal River, Chandler Brook, the East Branch, and
sections of Toddy Brook, Pratt's Brook, Deer Brook, and an unnamed tributary to Chandler Brook, as depicted on the Zoning Map.
Town of North Yarmouth Land Use Ordinance
Page 114 of 292
I.
Campgrounds: Campgrounds are prohibited in the Resource Protection District. Campgrounds
within the Residential Shoreland District shall conform to the minimum requirements imposed under
state licensing procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high- water line of a water body shall not be included in calculating land area
per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility and service
buildings shall be set back at least two hundred and fifty (250) feet, horizontal distance, from the
normal high-water line of the Royal River, Chandler Brook and the East Branch; at least one
hundred and fifty (150) feet, horizontal distance, from the normal high-water line of other water
bodies, at least one hundred and fifty (150) feet, horizontal distance, from the upland edge of
the Deer Brook wetland and Knight's Pond; and at least one hundred (100) feet, horizontal
distance, from the normal high-water line of tributary streams.
J. Individual-Private Campsites: Individual, private campsites not associated with campgrounds
are permitted provided the following conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or thirty thousand (30,000)
square feet of lot area within the Residential Shoreland District or Resource Protection District,
whichever is less, may be permitted.
2. Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet horizontal distance, from the normal high-
water line of a water body1, tributary streams, or the upland edge of the Deer Brook wetland or
Knight's Pond.
3. Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall not
be located on any type of permanent foundation except for a gravel pad, and no structure except
a canopy shall be attached to recreational vehicles.
4. The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1,000) square feet.
5. A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or landowner
is required.
6. When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred
twenty (120) days per year, all requirements for residential structures shall be met, including
the installation of a subsurface sewage disposal system in compliance with the State of Maine
Subsurface Wastewater Disposal Rules unless served by public sewage facilities.
7. Camping on town park or recreation land is regulated by the Town of North Yarmouth Parks
and
Recreation
Area
Use
and
Regulation
Ordinance.
[Amended
6/18/11]
1 Water Body: Any river or stream with Resource Protection zoning to include the Royal River, Chandler Brook, the East Branch,
and sections of Toddy Brook, Pratt's Brook, Deer Brook, and an unnamed tributary to Chandler Brook, as depicted on the Zoning
Map.
Town of North Yarmouth Land Use Ordinance
Page 115 of 292
K. Parking Areas:
1. Parking areas shall meet the shoreline and tributary stream setback requirements for structures
for the district in which such areas are located. The setback requirement for parking areas
serving public boat launching facilities shall be no less than fifty (50) feet, horizontal
distance, from the shoreline or tributary stream if the Planning Board finds that no other
reasonable
alternative exists
further
from
the
shoreline
or
tributary
stream.
2. Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
storm water runoff from flowing directly into a water body, tributary stream or wetland and where
feasible, to retain all runoff on-site.
3. In determining the appropriate size of proposed parking facilities, the following shall apply:
a. Typical parking space: approximately nine (9) feet wide and eighteen (18) feet long, Parking
spaces for a vehicle and boat trailer shall be forty (40) feet long.
b. Internal travel aisles: approximately twenty (20) feet wide.
L. Roads and Driveways: The following standards shall apply to the construction of roads
and/or driveways and drainage systems, culverts and other related features in RP or Shoreland
Zone
1. Roads and driveways shall be set back at least at least two hundred and fifty (250) feet,
horizontal distance, from the normal high-water line of the Royal River, Chandler Brook and the
East Branch; at least one hundred fifty (150) feet, horizontal distance, from the normal high-
water line of other water bodies; at least one hundred fifty (150) feet, horizontal distance, from
the normal high-water line of the Deer Brook wetland and Knight's Pond; and at least one
hundred (100) feet, horizontal distance, from the normal high-water line of tributary streams,
unless no reasonable alternative exists as determined by the Planning Board. If no other
reasonable alternative exists, the road and/or driveway setback requirement to no less than 100
feet, horizontal distance, upon clear showing by the applicant that appropriate techniques will
be used to prevent sedimentation of the water body, tributary stream, or wetland. Such
techniques may include, but are not limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts placed so as to avoid sedimentation
of the water body, tributary stream, or Deer Brook or Knight's Pond. On slopes of greater than
twenty percent (20%) the road and/or driveway setback shall be increased by 10 feet, horizontal
distance, for each 5 percent increase in slope above twenty percent (20%). This paragraph
does not apply to approaches to water crossings or to roads or driveways that provide access to
permitted structures and facilities located nearer to the shoreline or tributary stream due to an
operational necessity, excluding temporary docks for recreational uses. Roads and driveways
providing access to permitted structures within the setback area shall comply fully with the
requirements of this paragraph except for that portion of the road or driveway necessary for
direct access to the structure.
2. Existing public roads may be expanded within the legal road right-of-way regardless of their
setback from a water body, tributary stream, or the Deer Brook wetland or Knight's Pond.
3. New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to permitted
uses within the district. A road or driveway may also be approved by the Planning Board in a
Resource Protection District, upon a finding that no reasonable alternative route or
Town of North Yarmouth Land Use Ordinance
Page 116 of 292
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high- water line of water bodies, tributary streams, or the upland edge of the Deer Brook
wetland or Knight's Pond.
4. Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one vertical
and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section VII. Section 8.5.
5. Road and driveway grades shall be no greater than ten percent (10%) except for segments of
less than two hundred (200) feet.
6. In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least fifty (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal high-
water line of water bodies, tributary streams, or the upland edge of the Deer Brook wetland or
Knight's Pond. Surface drainage which is directed to an unscarified buffer strip shall be diffused
or spread out to promote infiltration of the runoff and to minimize channelized flow of the drainage
through the buffer strip.
7. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway or ditch. To accomplish this, the following
shall apply:
a. Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along the
road, or driveway at intervals no greater than indicated in the following table:
Grade (Percent)
0-2%
3-5%
6-10%
11-15% 16-20%
21+%
Spacing (Feet)
250 ft
200-135 ft
100-80 ft
80-60 ft
60-45 ft
40 ft
b. Drainage dips may be used in place of ditch relief culverts only where the grade is 10 percent
or less.
c. On sections having slopes greater than ten percent (10%), ditch relief culverts shall be
placed at approximately a thirty (30) degree angle down slope from a line perpendicular to
the centerline of the road or driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
8. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control installations
associated with roads and driveways shall be maintained on a regular basis to assure effective
functioning.
M. Signs: The following provisions shall govern the use of signs in a Resource Protection District or a
Residential Shoreland District:
1. Signs relating to goods and services sold on the premises shall be permitted, provided that such
signs shall not exceed 6 square feet in area and shall not exceed two (2) signs per premises.
Signs relating to goods or services not sold or rendered on the premises shall be prohibited.
Town of North Yarmouth Land Use Ordinance
Page 117 of 292
2. Name signs shall be permitted, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
3. Residential users may display a single sign not over three (3) square feet in area relating to the
sale, rental, or lease of the premises.
4. Signs relating to trespassing and hunting shall be permitted without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
5. Signs relating to public safety shall be permitted without restriction.
6. No sign shall extend higher than twenty (20) feet above the ground.
7. Signs may be illuminated only by shielded, non-flashing lights.
N. Storm Water Runoff: All new construction and development shall be designed to minimize storm
water runoff from the site in excess of the natural predevelopment conditions. Where possible,
existing natural runoff control features, such as berms, swales, terraces and wooded areas, shall
be retained in order to reduce runoff and encourage infiltration of storm waters. Storm water runoff
control systems shall be maintained as necessary to ensure proper functioning.
O. Septic Waste Disposal: All subsurface sewage disposal systems shall be installed in conformance
with the State of Maine Subsurface Wastewater Disposal Rules.1, and the following: a) clearing or
removal of woody vegetation necessary to site a new system and any associated fill extensions,
shall not extend closer than one hundred (100) feet, horizontal distance, from the normal high-water
line of a water body or the upland edge of the Deer Brook wetland and Knight's Pond; and b) a
holding tank is not allowed for a first-time residential use in the Residential Shoreland District or
Resource Protection District.
P. Essential Services: Where feasible, the installation of essential services shall be limited to existing
public ways and existing service corridors. The installation of essential services, other than road-
side distribution lines, is not permitted in a Resource Protection District, except to provide services
to a permitted use within said district, or except where the applicant demonstrates that no
reasonable alternative exists. Where permitted, such structures and facilities shall be located so as
to minimize any adverse impacts on surrounding uses and resources, including visual impacts.
Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
Q. Mineral Exploration and Extraction:
1. Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. All commercial
operations exceeding above limitation require review and permitting by Maine State Department
of Environmental Protection (DEP). All excavations, including test pits and holes shall be
immediately capped, filled or secured by other equally effective measures, to restore disturbed
areas and to protect the public health and safety.
1The Rules require new systems, excluding fill extensions, to be constructed no less than 100 horizontal feet from the normal high-water line of a
perennial water body. The minimum setback distance for new subsurface sewage disposal system may not be reduced by variance.
Town of North Yarmouth Land Use Ordinance
Page 118 of 292
2. Mineral extraction within the Resource Protection District or Residential Shoreland District is
defined as any operation that involves the excavation, processing, and/or storage of more than
100 cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material within
any twelve (12) month period. Mineral extraction is prohibited in the Resource Protection District.
Mineral extraction may be permitted as a Conditional Use in the Residential Shoreland District
under the following conditions:
a. A reclamation plan shall be filed with, and approved by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of subsection c. below.
b. No part of any extraction operation, including drainage and runoff control features shall be
permitted within a Resource Protection District.
c. Within 12 months following the completion of extraction operations at any extraction site,
which operations shall be deemed complete when less than one hundred (100) cubic yards
of materials are removed in any consecutive twelve (12) month period, ground levels and
grades shall be established in accordance with the following:
1) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
2) The final graded slope shall be two and one half to one (2 ½: 1) slope or flatter.
3) Topsoil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam shall
be obtained from off-site sources if necessary to complete the stabilization project.
3. In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions
as are necessary to minimize the adverse impacts associated with mineral extraction operations
on surrounding uses and resources.
4. Mineral Exploration and Extraction activities must also meet the requirements of Section 11.8.
Extraction of Earth Materials (Mineral Extraction).
R. Agriculture:
1. All spreading or disposal of manure shall be accomplished in conformance with the most current
edition of the Manure Utilization published by the Maine Department of Agriculture,
Conservation & Forestry and the Nutrient Management Act (7 M.R.S. §§ 4201-4214).",
2. Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, from
the normal high- water line of the water body1 or the upland edge of the Deer Brook Wetland or
Knight's Pond. All manure storage areas within a Residential Shoreland District or a Resource
Protection District must be constructed or modified such that the facility produces no discharge
of effluent or contaminated storm water.
1 Water Body: Any river or stream with Resource Protection zoning to include the Royal River, Chandler Brook, the East Branch, and sections of
Toddy Brook, Pratt's Brook, Deer Brook, and an unnamed tributary to Chandler Brook, as depicted on the Zoning Map.
Town of North Yarmouth Land Use Ordinance
Page 119 of 292
3. Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in
surface area, within a Residential Shoreland District or a Resource Protection District shall
require a Conservation Plan to be filed with the Planning Board. Non-conformance with the
provisions of said plan shall be considered to be a violation of this Ordinance.
4. There shall be no new tilling of soil within one hundred (100) feet from the normal high-water line
of a water body, nor within twenty-five (25) feet, horizontal distance, of tributary streams, the
Deer Brook wetland or Knight's Pond. Operations in existence on the effective date of this
Ordinance and not in conformance with this provision may be maintained.
5. Newly established livestock grazing areas shall not be permitted within 100 feet from the normal
high-water line of a water body, nor within twenty-five (25) feet, horizontal distance, of tributary
streams, the Deer Brook wetland or Knight's Pond. Livestock grazing associated with ongoing
farm activities, and which are not in conformance with the above setback provisions may
continue, provided that such grazing is conducted in accordance with a Conservation Plan.
S. Timber Harvesting:
Timber harvesting shall conform to the following provisions:
1. Selective cutting of no more than forty percent (40%) of the total volume of trees four (4) inches
or more in diameter measured at four and a half (4½) feet above ground level on any lot in any
ten (10) year period is permitted. In addition:
a. Within one hundred (100) feet, horizontal distance, from the normal high-water line of a
water body, tributary streams, or the upland edge of the Deer Brook wetland or Knight's
Pond there shall be no clearcut openings and a well-distributed stand of trees and other
vegetation, including existing ground cover, shall be maintained.
b. At distances greater than one hundred (100) feet, horizontal distance, from the normal high-
water line of a water body, tributary streams, or the upland edge of the Deer Brook Wetland
or Knight's Pond, harvesting operations shall not create single clearcut openings greater than
ten thousand (10,000) square feet in the forest canopy. Where such openings exceed five
thousand (5,000) square feet they shall be at least one hundred (100) feet apart. Such clearcut
openings shall be included in the calculation of total volume removal. For the purposes of
these standards volume may be considered to be equivalent to basal area.
2. Timber harvesting operations exceeding the forty percent (40%) limitation in Subsection S.1.
above, may be allowed by the Planning Board upon a clear showing, including a forest
management plan signed by a Maine licensed professional forester, that such an exception is
necessary for good forest management and will be carried out in accordance with the purposes
of this Ordinance. The Planning Board shall notify the Commissioner of the Department of
Environmental Protection of each exception allowed, within fourteen (14) days of the Planning
Board's decision.
3. No accumulation of slash shall be left within fifty (50) feet of the normal high-water line of a
water body. In all other areas slash shall either be removed or disposed of in such a manner that
it lies on the ground and no part thereof extends more than 4 feet above the ground. Any debris
that falls below the normal high-water line of a water body shall be removed.
Town of North Yarmouth Land Use Ordinance
Page 120 of 292
4. Timber harvesting equipment shall not use stream channels as travel routes except when:
a. Surface waters are frozen; and
b. The activity will not result in any ground disturbance.
5. All crossings of flowing water shall require a bridge or culvert, except in areas with low banks
and channel beds which are composed of gravel, rock or similar hard surface which would not be
eroded or otherwise damaged.
6. Skid trail approaches to water crossings shall be located and designed so as to prevent water
runoff from directly entering the water body or tributary stream. Upon completion of timber
harvesting, temporary bridges and culverts shall be removed and areas of exposed soil re-
vegetated.
7. Except for water crossings, skid trails and other sites where the operation of machinery used in
timber harvesting results in the exposure of mineral soil shall be located such that an unscarified
strip of vegetation of at least seventy (75) feet in width for slopes up to ten percent (40%) shall
be retained between the exposed mineral soil and the normal high-water line of the water body
or upland edge of the Deer Brook wetland or Knight's Pond. For each ten percent (10%)
increase in slope, the unscarified strip shall be increased by twenty (20) feet. The provisions
of this paragraph apply only to a face sloping toward the water body, Deer Brook wetland or
Knight's Pond, provided, however, that no portion of such exposed mineral soil on a back face
shall be closer than twenty-five 25 feet from the normal high-water line of a water body or upland
edge of the Deer Brook wetland or Knight's Pond.
T. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting:
1. In a Resource Protection District the cutting or removal of vegetation shall be limited to that
which is necessary for uses expressly authorized in that district.
2. Except in areas as described in number T.1, above, and except to allow for the development of
permitted uses, within a strip of land extending one hundred (100) feet horizontal distance, from
the normal high- water line of a water body, tributary streams, or the upland edge of the Deer
Brook wetland or Knight's Pond, a buffer strip of vegetation shall be preserved as follows:
a. There shall be no cleared opening greater than two hundred fifty (250) square feet in the
forest canopy (or other existing woody vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown. However, a footpath not to exceed
six (6) feet in width as measured between tree trunks and/or shrub stems is permitted
provided that a cleared line of sight to the water through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is permitted provided that a well-distributed
stand of trees and other natural vegetation is maintained. For the purposes of this section
(T.2.b) a "well-distributed stand of trees" is defined as maintaining a minimum rating score
of 16 points per twenty-five (25) foot by fifty (50) foot (1,250 square feet) rectangular area as
determined by the following rating system.1
1As an example, if a 25-foot x 50-foot plot contains 4 trees between 2 and 4 inches in diameter, 2 trees between 4 and 8 inches in diameter, 3
trees between 8 and 12 inches in diameter, and 2 trees over 12 inches in diameter, the rating score is: (4x1) + (2x2) + (3x4) + (2x8) = 36 points.
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 20 points (36 - 16 = 20) may be removed from the plot provided
that no cleared openings are created.
Town of North Yarmouth Land Use Ordinance
Page 121 of 292
Diameter of Tree at 4-1/2
feet Above Ground Level
(inches)
2" to less
than 4"
4" -to less
than 8 "
8" to less
than 12"
12" or
greater
Points
1
2
4
8
For the purposes of Section T.2.b above, "other natural vegetation" is defined as retaining
existing vegetation under 3 feet in height and other ground cover and retaining at least five (5)
saplings less than two (2) inches in diameter at four and a half (4½) feet above ground level for
each twenty (25) foot by fifty (50) foot rectangle area. If five (5) saplings do not exist, no woody
stems less than two (2) inches in diameter can be removed until five (5) saplings have been
recruited into the plot.
Notwithstanding the above provisions, no more than forty percent (40%) of the total volume of
trees four (4) inches or more in diameter, measured at four and a half (4½) feet above ground
level may be removed in any ten (10) year period.
c. In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in
height and other ground cover, including leaf litter and the forest duff layer, shall not be cut,
covered, or removed, except to provide for a footpath or other permitted uses as described in
section T.2 and 2.a, above.
d. Pruning of tree branches, on the bottom 1/3 of the tree is permitted.
e. In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, diseased,
unsafe, or dead trees results in the creation of cleared openings, these openings shall be
replanted with native tree species unless existing new tree growth is present.
Section T.2., above, does not apply to those portions of public recreational facilities adjacent to
public swimming areas as long as cleared areas are limited to the minimum area necessary.
3. At distances greater than one hundred (100) feet horizontal distance, from the normal high-water
line of a water body1, tributary streams, or the upland edge of the Deer Brook wetland or Knight's
Pond, there shall be permitted on any lot, in any ten (10) year period, selective cutting of not more
than 40 percent of the volume of trees four (4) inches or more in diameter, measured four and a
half (4½) feet above ground level. Tree removal in conjunction with the development of permitted
uses shall be included in the fourty (40) percent calculation. For the purposes of these standards
volume may be considered to be equivalent to basal area.
4. In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
twenty five (25%) percent of the lot area within the Residential Shoreland District and/or Resource
Protection District or 10,000 square feet, whichever is greater, including land previously cleared.
5. Legally existing nonconforming cleared openings may be maintained, but shall not be enlarged,
except as permitted by this Ordinance.
6. Fields and other cleared openings that have reverted to primarily shrubs, trees, or other woody
vegetation shall be regulated under the provisions of this section (T).
1 Water Body: Any river or stream with Resource Protection zoning to include the Royal River, Chandler Brook, the East Branch, and sections
of Toddy Brook, Pratt's Brook, Deer Brook, and an unnamed tributary to Chandler Brook, as depicted on the Zoning Map.
Town of North Yarmouth Land Use Ordinance
Page 122 of 292
U. Erosion and Sedimentation Control:
1. All activities that involve filling, grading, excavation or other similar activities which result in
unstabilized soil conditions and which require a permit shall also require a written soil erosion
and sedimentation control plan. The plan shall be submitted to the permitting authority for
approval and shall include, where applicable, provisions for:
a. Mulching and revegetation of disturbed soil.
b. Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
c. Permanent stabilization structures such as retaining walls or rip-rap.
2. In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be required
shall be avoided wherever possible, and natural contours shall be followed as closely as
possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The amount
of exposed soil at every phase of construction shall be minimized to reduce the potential for
erosion.
4. Any exposed ground area shall be temporarily or permanently stabilized within one week from
the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other effective
measures. In all cases permanent stabilization shall occur within nine (9) months of the initial
date of exposure. In addition:
a. Where mulch is used, it shall be applied at a rate of at least one bale per five hundred (500)
square feet and shall be maintained until a catch of vegetation is established.
b. Anchoring the mulch with netting, peg and twine or other suitable method may be required
to maintain the mulch cover.
c. Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
5. Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainage ways shall be designed and constructed in order to
carry water from a twenty-five (25) year storm or greater, and shall be stabilized with vegetation
or lined with riprap.
V. Soils: All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on-site
investigation and be prepared by state- certified professionals. Certified persons may include Maine
certified soil scientists, Maine registered professional engineers, Maine certified geologists and
other persons who have training and experience in the recognition and evaluation of soil properties.
The report shall be based upon the analysis of the characteristics of the soil and surrounding land
and water areas, maximum ground water elevation, presence of ledge, drainage conditions, and
other pertinent data that the evaluator deems appropriate. The soils report shall
include recommendations for a proposed use to counteract soil limitations where they exist.
Town of North Yarmouth Land Use Ordinance
Page 123 of 292
W. Water Quality: No activity shall deposit on or into the ground or discharge to the waters of the state
any pollutant that, by itself or in combination with other activities or substances, will impair designated
uses or the water classification of the water body, tributary stream or Deer Brook wetland or Knight's
Pond.
X. Archaeological Site: Any proposed land use activity involving structural development or soil
disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority shall be submitted by the applicant to the
Maine Historic Preservation Commission for review and comment, at least thirty (30) days prior to
action being taken by the permitting authority. The permitting authority shall consider comments
received from the Commission prior to rendering a decision on the application.
SECTION 9.2 GROUNDWATER PROTECTION OVERLAY DISTRICT: BEST MANAGEMENT
PRACTICES [AMENDED 6/17/24]
A. Purpose: The purpose of these provisions are to maintain and preserve critical groundwater
resources associated with existing and future public water supplies of the Yarmouth Water District.
The protection of groundwater is critical to maintaining the health, safety and general welfare of the
residents of North Yarmouth and other users of the public water supplies.
B. Applicability: All land use activities located within the Groundwater Protection Overlay District shall
conform to these provisions. Land use activities shall be reviewed on accordance with Section VII.
Zoning District Regulations. These standards are in addition to those of the underlying district.
Where there are conflicts within the provisions of this Ordinance the more restrictive provisions shall
apply.
Exemptions:
1. The review portions of this Section shall not apply to use and storage of normal quantities of
household products. However, homeowners shall use best management practices and
whatever means practical to insure that chemicals and nutrients do not get into the groundwater.
2. The review portions of this Section shall not apply to essential operations of the Yarmouth Water
District or other official safety or utility entities. However, these entities shall use best
management practices and whatever means practical to insure that pollutants do not get into the
groundwater.
C. Monitoring and Follow-up: The provisions of the Groundwater Protection Overlay District will be
evaluated periodically based on need, with a complete re-evaluation no later than the year 2010, or
when the total number of residential units within in that portion of the Groundwater Protection
Overlay District that overlays the Village Center District and adjacent areas, approaches a total of
450 residential units. The Yarmouth Water District will install groundwater-monitoring wells to provide
on-going data and analysis on the impacts of residential and other types of development on
groundwater quality. The Code Enforcement Officer (CEO) will track the total number of residential
units, and will consultant with the Yarmouth Water District at least once a year to discuss the
groundwater monitoring results. The ground water monitoring data will be used to re-evaluate the
maximum threshold of 450 residential units for this area, and the minimum lot size and density
standards of these provisions.
D. Restoration of Unsafe Property: Nothing in this Section shall prevent the strengthening or
restoring to safe condition any part of any structure or use declared unsafe by the CEO.
Town of North Yarmouth Land Use Ordinance
Page 124 of 292
E. Control of Existing Threats, Inspections and Monitoring: The CEO shall have the right to enter
and inspect all premises that carry on the land uses listed in Section VII. Zoning District Regulations
Table 7-1. Land Uses by District, and any other uses that pose as a potential threat to groundwater
due to their location in the Groundwater Protection Overlay District. A representative of the
Yarmouth Water District, including a consultant, may accompany the CEO. Further, the CEO shall
have the right, upon twenty-four (24) hour notice, to conduct such testing, as the town may deem
appropriate to determine that best management practices and groundwater pollution control
devices are in good condition and are working properly. Such testing shall be at the town or water
district's expense. If such testing indicates that the groundwater has been contaminated above the
State Primary or Secondary Drinking Water Standards, then further testing shall be at the expense
of the existing owner of the land in question. Additionally, the owner shall reimburse the town and/or
the water district for expenses incurred in the initial well installation and testing. The town and the
Yarmouth Water District shall have the right to install groundwater-monitoring wells and shall further
maintain the right to sample such wells on properties within the Groundwater Protection Overlay
District when the town or water district can clearly show that groundwater monitoring in the area will
serve to protect the public water supply from existing or potential threats.
F. Yarmouth Water District Assistance: The town may request assistance in administering and
enforcing the provisions of the Groundwater Protection Overlay District from the Yarmouth Water
District. The town shall notify the Yarmouth Water District of all pending applications; the time, date,
and place of Planning Board, CEO, Local Plumbing Inspector, Zoning Board of Appeals, or other
local consideration of the application; and give the Yarmouth Water District an opportunity to review
and comment on the proposal. The Yarmouth Water District or its designee may present evidence
and comment before or during public hearings or meetings concerning development or activity in
the Groundwater Protection Overlay District. A copy of correspondence relative to the proposal,
such as complete application determinations, approvals, and plans, shall be sent to the Yarmouth
Water District.
G. Best Management Practices Required of All Development and Land Uses: All development
and land use activities, including development and land use activities in existence as of the date of
adoption of these provisions (June 14, 2005), located within the Groundwater Protection Overlay
District shall comply with the following Best Management Practices to protect the quality and quantity
of the public water supply. Best Management Practices, as applied in the State of Maine, are
management practices that will mitigate the impacts of the activity on water quality. In some
instances, there may be more than one management practice that would accomplish the same
result. In other instances, depending on the site location and on- site conditions, more than one
management practice may be needed to fully mitigate the problem. Therefore, the CEO and the
Planning Board shall use their discretion to determine which management practices apply, and in
the case of existing development and land use activities, the timeframe for compliance. The
Planning Board and CEO shall require all development located within the Groundwater Protection
Overlay District to comply with the Best Management Practices contained in this Section and may
refer to additional applicable Best Management Practices which have been published by or in
conjunction with the Maine Drinking Water Program, Maine Department of Environmental
Protection (DEP), or other technical experts.
H. Best Management Practices:
1. Chemical Storage: Chemical storage includes storage in tanks (above and underground), and
in drums of different sizes. It can also include storage of solid chemicals in bags, or in bulk (in
piles or silos). The principal chemicals of concern regarding groundwater contamination include
petroleum products, solvents, agricultural chemicals (fertilizers, herbicides, fungicides, etc.),
manure and road salt. Stored waste chemicals are also a concern. (* These special provisions
pertain to "large" facilities and storage units. Large is defined as in excess of 275 lbs solid and
275 gallons liquid.)
Town of North Yarmouth Land Use Ordinance
Page 125 of 292
a. All chemicals shall be stored under cover, and on impervious working surfaces, without floor
drains. Storage space shall be designed so that failures, emergencies, extreme storm
events or routine site clearing will not cause material or wash water to run on the bare
ground.
b. Secondary containment shall be designed to include impervious holding of fluids of at least
twenty percent (20%) of the volume of storage of all liquid chemicals, and one hundred ten
percent (110%) of the volume of the largest storage container, by permanent dikes or other
means.
c. *Tanks for liquid storage shall be equipped with automatic shutoffs and high level alarms.
Personnel shall be trained to respond to shutoffs and alarms.
d. All piping shall be designed to prevent line breakage by collision.
e. All containers and piping shall be secure and resistant to corrosion, and shall be clearly
labeled with name of chemical, and date of purchase (or generation of waste).
f.
*A Spill Prevention, Containment and Countermeasure Plan (SPCC) shall be prepared
under DEP guidance, and for submittal to the CEO, Fire Department and the Yarmouth Water
District. This plan shall include provisions to prevent and catch spills during loading and
transfer activities. This SPCC plan shall be reviewed and updated annually.
g. *All storage areas shall be inspected at least weekly, and an inventory and tracking system
of inspections shall be maintained.
h. Adequate spill clean up materials must be kept on hand at the facility. Spills must be cleaned
up promptly, and spilled materials disposed of properly.
i.
"Pre-plans" for firefighting must be prepared bearing in mind the possibility that chemicals
could cause groundwater contamination if washed out of a burning building by water. Foam
materials and spray plans should be included in the plan, appropriate to the materials and
quantities stored in the facility.
j.
The DEP's hazardous waste regulations must be followed.
k. Manure and ash and liming agents used for agricultural purposes must be stored under
cover.
2. Chemical Use: Chemical use includes but is not limited to: combustion, degreasing and other
cleaning, mixing and dilution with other chemicals or water, catalytic reactions, all with or without
the production of a waste material. Some waste materials are recycled on a limited scale during
the process. Types of chemicals include all those listed above under chemical storage, except
for agricultural chemicals, manure and road salt.
a. Use non-hazardous chemicals whenever possible. If hazardous chemicals must be used,
provide justification for why they cannot be replaced by non-hazardous chemicals.
b. Design chemical feed lines and temporary storage containers to prevent spillage by collision
and corrosion.
c. Clearly label all storage vessels and chemical feed lines with chemical name.
d. Check for spillage and leaks at least weekly. Leaking containers must be removed or placed
Town of North Yarmouth Land Use Ordinance
Page 126 of 292
in over-packs (secure containers that are larger than the leaking container).
e. Prepare a SPCC Plan under DEP guidance (see H.1. above). This plan shall include
provisions for cleaning up small spills and containing large spills in emergency. Keep
emergency cleanup materials on hand.
f.
All spills must be promptly reported to DEP, the CEO and North Yarmouth Fire Department,
and the Yarmouth Water District.
3. Chemicals and Organic Materials Spreading or Spraying: "Agricultural and Silvicultural" applies
in this case to areas of greater than two (2) acres (includes transportation or utility corridors), or
hoop/greenhouses, or nursery/garden shops greater than one thousand (1,000) square feet.
a. Application of Agricultural and Silvicultural Chemicals:
1) All pesticides and/or herbicides shall be applied in accordance with label directions and
the regulations of the Maine Board of Pesticides Control.
2) Herbicides and pesticides must only be applied by trained personnel, i.e. by certified
applicators, who must be informed regarding the delineated Groundwater Protection
Overlay District.
3) All agricultural fertilizers shall be applied in accordance with label directions.
4) Fertilizer applications are to be tailored to the specific needs of the crop, as determined
by soil suitability analyses. Use of slow-release fertilizers is preferred.
5) Irrigation schedules shall be coordinated with pesticide and nutrient application to
minimize the possibility of leaching. Pesticides and fertilizers shall not be applied to frozen
ground, or immediately before storm events.
6) Notice of intent to apply agricultural chemicals shall be given to the CEO and the
Yarmouth Water District at least five (5) days prior to application.
b. Spreading of Organic Materials in Agriculture:
1) A Nutrient Management Plan must be provided for all farming activities. Such a plan shall
describe how animals will be kept within the area, (the number of animals will in any case
not exceed twenty (25) animal units (1 unit =1,000 lbs of live animal weight) per ten (10)
acres of land), and/or how manure will be stored, handled and spread (no more than fifty
(50) tons of manure to be used per ten (10) acres).
2) Application of manures shall be tailored to the specific needs of the crop, as determined
by soil suitability analyses.
3) Manures shall not be applied over very thin soils (less than one (1) foot) or exposed
bedrock.
4) Manure shall not be applied on frozen ground, or immediately before storm events.
4. Road Maintenance, Parking Areas and Storm Water:
a. Storm water from frequently used parking lots (e.g. for commercial establishments, and
workplaces) shall be diverted away from the Groundwater Protection Overlay District, if
possible, and shall not be channeled into bodies of water. Filter strips and vegetated areas
Town of North Yarmouth Land Use Ordinance
Page 127 of 292
shall be installed and maintained wherever possible.
b. Storm water impoundments, detention basins and ponds shall be located outside the
Groundwater Protection Overlay District whenever possible. These systems shall be
inspected frequently and maintained in good working order.
c. The use of road salt, sand and chemicals should be minimized. Salts and chemical shall be
stored away from water bodies or drainage swales, on an impermeable surface and covered
with waterproof material.
d. Ditches and catch basis shall be inspected regularly to prevent excessive sediment build-up.
e. Snow shall not be dumped into bodies of water.
f.
Oil shall not be used on roads. Water may be used to control dust.
g. Vehicles transporting or storing hazardous materials (other than fuel to operate the vehicle)
shall not park in the Groundwater Protection Overlay District overnight, unless in a secure,
contained area. The CEO, Yarmouth Water District and North Yarmouth Fire Department
shall be notified in advance of any such parking.
h. Vehicles and equipment using chemicals or petroleum products that are parked in the
Groundwater Protection Overlay District shall be kept in good operating condition and
regularly inspected for leaks, deterioration, malfunctions and spills. Any leaks or spills shall
be cleaned up promptly, and the CEO, North Yarmouth Fire Department, and Yarmouth
Water District notified immediately.
5. Residential Activities, Home Occupations and Other Wastewater Disposal: Activities of
concern include: production of septic wastes, use of gasoline or fuel oil, automotive or similar
shop work, lawn or garden care with fertilizers and pesticides, use and disposal of chemicals
from home occupations such as photographic studios, beauty salons, car washing activities, etc.
Most homes contain stores of small quantities of several hazardous chemicals (gasoline, fuel
oil, bleach, paint thinners, pesticides, drain cleaners, etc.). Even disposal of small quantities of
these chemicals through septic systems or on the ground can cause significant groundwater
contamination.
a. Residents and other owners of properties located within the Groundwater Protection Overlay
District should be informed of the potential for groundwater contamination from domestic
use of various chemicals.
b. Home occupations shall not negatively impact groundwater quality. No on-site disposal of
chemicals from home occupations shall be allowed within the Groundwater Protection
Overlay District.
c. Developers of residential subdivisions and other developments with significant amounts of
wastewater shall complete a nitrate loading study. The concentration of nitrate at the well
shall be calculated, using the following conservative estimates: concentrations of nitrate
leaching from the septic system: 40 ppm; volume of leachate per day per housing unit: three
hundred sixty (360) gallons; natural recharge rates for precipitation through soils: 0.5 gallons
per minute per acre. Such mass balance calculations shall include all existing septic
systems and the proposed development. In order to be allowed, the applicant must find that
nitrate concentrations will not exceed twenty-five percent (25%) of drinking water standard
at a Yarmouth Water District well.
Town of North Yarmouth Land Use Ordinance
Page 128 of 292
d. Provisions shall be made to maintain septic systems in good working order. Septic tanks
shall be pumped out and the systems inspected, and any needed repairs or replacements
made, at least every three (3) to five (5) years.
e. Heating oil tanks and other fuel tanks shall be located inside or on a stable concrete slab
above ground if outside. If located outside, filters and lines shall be protected from breakage.
Tanks and lines shall be inspected and tested for leaks regularly.
f.
The use of floor drains is strongly discouraged, and may occur only when absolutely
necessary. Water entering floor drains shall be prevented from picking up pollutants or
treated to ensure that pollutants do not enter the groundwater. Existing floor drains shall be
sealed whenever possible, so that pollutants do not enter the groundwater.
g. New and existing structures shall be connected to public sewer whenever possible. Sewer
lines and related piping shall be carefully inspected to insure proper installation, and tested
for leakage and certified by the Local Plumbing Inspector. Lines shall be properly maintained
and tested for leakage periodically. Sewers and drainage systems shall be designed too
assure that storm water does not enter sanitary sewers. Malfunctionings, failings,
reconstructions, or problems with sewers shall be reported promptly to the CEO and the
Yarmouth Water District.
h. Any spills should be reported to the CEO and the Yarmouth Water District immediately.
6. Fire Protection: A "Pre-Plan" for fire prevention and fire suppression for all facilities that store,
handle or use hazardous materials shall be prepared. These plans should be tailored to the
materials stored on site, and designed to limit groundwater contamination in the event of fire.
7. Mineral Extraction: Mineral extraction, including sand and gravel extraction may cause
unintended changes in the flow of groundwater. Any mineral extraction produces pits, which
can be used for illegal dumping. Vehicles used for mineral extraction may cause spills. Rock
crushers use water that may wash pollutants into the groundwater.
a. The following activities shall be prohibited in the Groundwater Protection Overlay District:
mining for metallic ores, rock crushers, salting and oiling of roads, and the storage of
petroleum products, vehicles, chemicals and hazardous materials.
b. Disused gravel pits shall be reclaimed according to plans submitted to the town and the
Yarmouth Water District.
c. All mineral extraction activities must have emergency spill response plans and equipment
on hand such that a spill totaling the full fuel tanks of the largest vehicle used in the pit can
be removed outside the Groundwater Protection Overlay District within one day.
8. Fill: Only clean non-polluting fill (no non-natural odors, non staining, and not originating at a
known spill site) may be used for filling depressions or raising the ground level. Fill areas shall
be well setback from rivers, streams, books, ponds, wetlands and other bodies of water and
appropriate erosion and sedimentation control measures shall be implemented.
9. Wells: Wells provide a possible conduit for contaminants originating in surface water, or upper
aquifers to migrate to groundwater below.
a. Wellheads shall be designed such that surface water does not enter groundwater through
of the borehole around the well casings.
Town of North Yarmouth Land Use Ordinance
Page 129 of 292
b. Wells that penetrate to lower aquifers shall have the space between borehole and casing
grouted where it crosses an aquiclude.
c. Wells that are no longer in service for extraction or monitoring shall be abandoned in a
manner appropriate to prevent the entry of contaminants and from mixing of separate
subsurface water- bearing zones. This may involve the use of bentonite and/or cement grout
where a watertight seal is deemed necessary.
d. High yielding wells (for uses other than domestic purposes) will only be allowed if a safe
yield analysis, conducted by a Maine certified geologist, can demonstrate that there is
sufficient water for both the new well and the public water source.
e. Wells shall be inspected regularly to check for structural integrity, capping, and any needed
repairs or maintenance.
10. Animal Husbandry:
a. A Nutrient Management Plan must be provided for all farming activities. Such a plan shall
describe how animals will be kept within the area, (the number of animals will in any case
not exceed 25 animal units (1 unit =1000 lbs of live animal weight) per ten (10) acres of
land), or how manure will be spread (no more than fifty (50) tons of manure to be used per
ten (10) acres).
b. Application of manures shall be tailored to the specific needs of the crop, as determined by
soil suitability analyses.
c. Manures shall not be applied over very shallow soils (less than one (1) foot) or exposed
bedrock.
d. Manure shall not be applied on frozen ground, or immediately before storm events.
e. Animal husbandry operations shall be pursuant to Section 9.2 Groundwater Protection
Overlay District: Best Management Practices.
SECTION 9.3 ROYAL RIVER CORRIDOR OVERLAY DISTRICT [AMENDED 6/19/21]
A. Purpose: The Royal River Corridor Overlay District includes land areas within five hundred (500)
feet on either side of the Royal River, Chandler Brook and the East Branch. The Royal River
Corridor Overlay District is designed to provide additional standards to preserve the Royal River
Corridor, including the Chandler Brook corridor and the East Branch corridor as greenways in open
space uses. The purpose of the Royal River Corridor Overlay District is to preserve open space and
conserve natural beauty; protect wildlife habitat and corridors; protect water quality; protect
archaeological and historic resources; provide passive recreational corridors; control building sites
and placement of structures and land uses; and anticipate and respond to the impacts of
development in the river corridors.
B. Standards: In addition to the provisions of the underlying district, all land use activities within the
Royal River Corridor Overlay District shall be in accordance with these provisions.
1. Uses Requiring Site Plan Review: Uses listed in Section VII. Zoning District Regulations, Table
7-1. Land Uses by District, as requiring Site Plan Review in the Royal River Corridor Overlay
District shall be designed to preserve open space and the natural vegetation of the corridor
consistent with the town's vision for the Royal River Corridor as described in the Comprehensive
Plan and the Open Space Plan. In addition to the submission requirements in Section 3.3.
Building/Land Use Permits, the Planning Board shall require that the location of the building
envelop be identified on the plan and a written description of the best management practices
Town of North Yarmouth Land Use Ordinance
Page 130 of 292
that will be used to limit soil erosion and sedimentation for all activities within the corridor that
will involve disturbance of the natural vegetation, both during and after construction be
submitted. The Planning Board may require that the best management practices be pursuant
to Section 9.1.U. Erosion and Sedimentation Control.
2. Subdivisions: All subdivisions within the Royal River Corridor Overlay District shall be in
accordance with Section 11.3. Clustered Housing Development and Open Space Development,
and shall be designed to preserve open space within the Royal River Corridor Overlay District,
as follows:
a. The area between the normal high-water line of the Royal River, Chandler Brook and/or the
East Branch and 250 feet from the normal high-water line of these water bodies shall be
permanently preserved in open space.
b. The area between 250 feet from the normal high-water line of the Royal River, Chandler
Brook and/or the East Branch and the Corridor boundary(five hundred (500) feet from the
normal high-water line of the Royal River, Chandler Brook and/or the East Branch) as
depicted on the Zoning Map shall be used to meet the fifty percent (50%) open space
requirement.
c. Additional Submission: The applicant shall submit a Royal River Corridor Management
Plan that includes consideration for preserving natural beauty, enhancing wildlife habitat and
corridors, considers public access to water bodies and inter-connected trails, and shows
how the subdivision development will contribute to the town's vision for the Royal River
Corridor District as described in the town's Comprehensive Plan.
Town of North Yarmouth Land Use Ordinance
Page 131 of 292
X.
PERFORMANCE AND DESIGN STANDARDS FOR SITE PLAN
REVIEW AND SUBDIVISION REVIEW
SECTION 10.1 APPLICABILITY
These design and performance standards are applicable to those uses requiring Site Plan Review and
Subdivision Review. In reviewing a proposed development, the Planning Board shall review the application
for conformance to the applicable standards and make findings of fact for each prior to approval of the final
plan. The burden of proof of conformance shall be upon the applicant to provide clear and convincing
evidence that the final plan meets the standards of this Ordinance.
Note: The term "development" as used in this Section includes land use activities requiring Site Plan
Review and development requiring Subdivision Review pursuant to Section VII. Zoning District
Regulations Table
7.1. Land Uses by District.
SECTION 10.2 GENERAL LAYOUT OF DEVELOPMENT [AMENDED 6/19/21]
A. Utilization of the Site: The plan for the development must reflect the natural capabilities of the site
to support the development. Buildings, lots and support facilities must be clustered in those portions
of the site that have the most suitable conditions for development. Environmentally sensitive areas,
including but not limited to, wetlands, steep slopes, 100-year floodplains, significant wildlife habitats
and corridors, scenic areas, unique natural areas, and significant groundwater aquifers must be
maintained and preserved to the maximum extent practical. Natural drainage areas must also be
preserved to the maximum extent practical. The development must include appropriate measures
for protecting these resources, including but not limited to, modification of the proposed design of
the site, timing of construction, and limiting the extent of land disturbance.
B. Lots: [Amended 4/9/16]
1. If more than one building is located on a lot, a plan must be submitted to the CEO to show how
the lot can be divided by theoretical lot lines to create multiple building lots to conform to the
standards of this Ordinance. The theoretical lot lines show compliance with the standards of this
Ordinance without causing legal subdivision of land. Theoretical lot lines may not span multiple
lots of record.
2. Land within the right-of-way of roads serving more than two (2) lots shall not be included toward
calculating minimum lot area.
3. Wherever practical, side lot lines shall be perpendicular to the street.
4. If a lot on one side of a stream, brook or private road fails to meet the minimum requirements
for lot size, it may be combined with a lot on the other side of the stream, brook or private road to
meet the minimum lot size.
5. Subdivisions, only: The subdivision of tracts into parcels with more than twice the required
minimum lot size shall be laid out in such a manner as either to provide for or preclude future
division. Deed restrictions and notes on the plan shall either prohibit future divisions of the lots
or specify that any future division shall constitute a revision to the plan and shall require approval
from the Planning Board, subject to the criteria of the subdivision statute, the standards of these
regulations and conditions placed on the original approval.
Town of North Yarmouth Land Use Ordinance
Page 132 of 292
6. Interconnected Development: Where possible, developments shall be designed to facilitate
future interconnected street, pedestrian (sidewalks and trails), bicycle, and open space
networks pursuant to Sections VIII & X.
C. Blocks: Within the Village Center District and Village Residential District, where street lengths
exceed one thousand (1,000) feet between intersections with other streets, the Board may require
a utility/pedestrian easement, at least thirty (30) feet in width, to provide for underground utility
crossings and/or a pedestrian pathway of at least five (5) feet in width. Maintenance obligations of
the easement(s) shall be included in the written description of the easement.
D. Utilities: Utilities serving developments in the Village Center District and Village Residential District
shall be installed underground. In other districts, utilities serving lots with a street frontage of one
hundred twenty-five (125) feet or less shall be installed underground. The Planning Board may
approve overhead utilities when the applicant proposes affordable housing and provides evidence
that the increased costs of underground utilities will raise the costs of the housing beyond the
requirements for affordable housing in this Ordinance.
E. Monuments Required in All Developments:
1. Stone monuments shall be set at all street intersections and points of curvature, but no further
than 750 feet apart along street lines without curves or intersections.
2. Stone monuments or capped iron pipe shall be set at all corners and angle points of the
development boundaries, not already marked, where the interior angle of the development
boundaries is one hundred thirty-five degrees (135°) or less.
3. Stone monuments shall be a minimum of four inches square at the top and four feet in length,
and set in the ground at final grade level. After they are set, drill hole 1/2 inch deep shall locate
the point or points described above.
4. All other development boundary corners and angle points, as well as all lot boundary corners
and angle points shall be marked by suitable monumentation, as required by the Maine Board
of Registration of Land Surveyors.
SECTION 10.3. BROOK, POND, VERNAL POOL AND WETLAND BUFFERS
A. Purpose and Applicability:
1. The purpose of these requirements is to protect water quality, aquatic life, and wildlife habitat in
and adjacent to streams, ponds and wetlands town wide, and to protect private and public
property from flooding and poor drainage conditions caused by locating buildings in or close to
these areas. These regulations are intended to protect natural resource areas that are not
covered in Section Residential Shoreland District and Natural Resource Protection District
Performance Standards.1
2.
These regulations distinguish between high and low value wetlands. High value wetlands
generally have surface water for a prolonged period during the growing season, or, they are
located in close proximity to other wetlands, ponds and streams. These are the two most
important factors in determining how well a wetland functions in terms of providing benefits to
the community.
1 Section VII Section 7-1. Residential Shoreland District and the Natural Resource Protection District Performance Standards are applicable to the
following: Royal River, Chandler Brook, the East Branch, Deer Brook Wetland, Knight's Pond, and the Resource Protection portions of Toddy
Brook, Deer Brook, Pratt's Brook, and an unnamed tributary to Chandler Brook (as displayed on the Zoning Map), and tributary streams to the
aforementioned when located within the Residential Shoreland District and Resource Protection District.
Town of North Yarmouth Land Use Ordinance
Page 133 of 292
3. In the event that the requirements of this section overlap the requirements of Section 7.1.
Residential Shoreland District and Natural Resource Protection District Performance
Standards, the more restrictive requirements shall apply.
B. Protected Resources:
1. Stream: A "river, stream or brook" as defined by the Maine Natural Resource Protection Act
2. Pond: A naturally occurring inland body of water, but not including great ponds as defined by
the Natural Resource Protection Act.
3. Vernal Pool: A naturally occurring, temporary to permanent body of water in shallow
depressions that fills during the spring and fall and may be dry during the summer. The vernal
pool contains no viable populations of predatory fish, and it provides primary breeding habitat for
wood frogs, spotted salamanders, blue-spotted salamanders, and fairy shrimp and provides
habitat for other wildlife including several endangered and threatened species. The presence of
one or more of these species is usually conclusive evidence of a vernal pool.
4. High Value Wetlands: A freshwater wetland, as defined by the Maine Natural Resource
Protection Act1, which meets one or more of the following criteria:
a. Contains a pond or a vernal pool;
b. Lies within the 100-year floodplain of a stream or a pond;
c. More than fifty percent (50%) of the dominant species in all strata of the vegetation consist of
facultative wetland or obligate wetland plant species, as listed in the National List of Plant
Species that Occur in Wetlands, by the U.S. Fish and Wildlife Service, latest edition.
5. Low Value Wetland: A wetland, as defined by the Natural Resource Protection Act, which
does not meet the criteria of a high value wetland.
C. Standards:
1. Vegetative buffers shall be located between all disturbed areas of a development and streams,
ponds, vernal pools and high value wetlands.
2. Vegetative buffers shall retain existing vegetation or be planted with trees native to the locale,
having a height of at least four (4) feet and be capable of growing at least twenty (20) feet in
height. For natural buffers, or for planted buffers at twenty (20) years after planting, the canopy
of the growth shall have no openings greater than two hundred fifty (250) square feet. Trees shall
be added where natural growth does not provide for sufficient canopy.
3. The buffer width shall be related to the slope of the land as presented in the following table.
1 A fresh water wetland means fresh water swamps, marshes, bogs and similar areas that are: inundated or saturated by surface or groundwater
at a frequency and for a duration sufficient to support, and under normal circumstances do support, a prevalence of wetland vegetation typically
adapted for life in saturated soils; and not considered part of great pond, coastal wetland, river, stream or brook. (Title 38 M.R.S. Section 480- B).
Town of North Yarmouth Land Use Ordinance
Page 134 of 292
Vegetative Buffer Requirements
Average Slope of the Land Between
Disturbed Area and
Normal High Water Mark (Percent)
Width* of Strip Between
Disturbed Area and
Normal High Water Mark (Feet)
0-10%
50
11-20%
90
21-30%
130
31-40%
170
41-50%
210
51-60%
250
61-70%
290
Over 70%
330
*Measured along the surface of the ground
Source: DEP Site Location Law Rules
4. For both natural and planted buffer strips, the ground shall be left in its natural state to the
greatest extent practical. The organic and duff layers shall not be removed.
5. Buffer strips shall be maintained in a reasonably natural state.
a. Clearing of dead and diseased trees may occur. Additional trees, native to the locale, having
a height of at least four (4) feet and capable of growing to at least twenty (20) feet in height
will be added where clearing creates canopy openings larger than two hundred fifty (250)
square feet.
b. The underlying vegetation, and the organic and duff layers shall not be removed.
6. Buildings and other structures must be set back a minimum of fifty (50) feet from all low value
wetlands. A buffer strip as described in subsections 4 and 5 above shall be maintained within
twenty-five (25) feet of all low value wetlands.
7. Permanent markers shall be installed a minimum of every one hundred (100) feet along the
upland boundary of all buffers. The Board may require additional markers if necessary to clearly
identify the upland boundary of the buffers.
D. Plan Submittals: When buffers are required pursuant to these provisions the following site
plan submittals shall be required for all activities requiring Subdivision Review or Site Plan Review.
1. The site plan shall show identified wetland types, the layout of the buffer and the topography of
the site. The extent of existing and proposed vegetation and the pre- and post- development
topography will be shown on the plan.
2. Description of existing vegetation in the proposed buffer area.
3. If a new buffer is proposed, a description of how the buffer will be developed.
4. Description of provisions for maintenance of the buffer area including restrictions on earth
moving and vegetative clearing.
5. List of deed restrictions and covenants to be included in deed to all affected properties or lots.
A drawing with the buffer location and markers shall be attached to the deed.
6. Plat with buffer location, marker locations, maintenance provisions, and list of deed
restrictions and/or covenants.
Town of North Yarmouth Land Use Ordinance
Page 135 of 292
E. Exemptions:
1. Buffers and setbacks are not required adjacent to the following areas:
a. Swales and ditches, and impoundments created for drainage purposes;
b. Artificial impoundments of streams constructed prior to the enactment of this Ordinance;
c. Low value wetlands, averaging thirty (30) feet or less in width, as determined by measuring
the width of five (5) evenly spaced sections, that function primarily as drainage swales in
upland areas.
2. Buffers and setbacks do not apply to the following projects:
a. Storm water management facilities
b. Road crossings, bridges, culverts, and the installation of utilities needed to access property
on the other side of wetlands and bodies of water;
c. Docks, boat ramps, and other structures necessary for direct access to water bodies.
SECTION 10.4 BUILDING STANDARDS [AMENDED 6/19/21]
A. Purpose:
1. To provide buildings that reflect the scale and character of buildings within the community.
2. To allow for flexible building expansion to increase floor area
3. To allow for attached or detached accessory buildings to provide additional usable space.
4. To allow additional buildings and structures to be provided on a lot.
B. Applicability:
1. This section applies to the construction of all new buildings, building renovations, and building
additions in the Village Center District.
2. This section applies to single-family detached dwelling units in a Pocket Neighborhood.
3. This section does not apply to a single-family detached dwelling but may be used as advisory
guidelines.
Town of North Yarmouth Land Use Ordinance
Page 136 of 292
CONTENTS
A. General Building Standards
1. Number of Buildings
10.4-2
2. Nonconforming Buildings
10.4-2
3. Building Assembly
10.4-3
4. Roofs
10.4-5
5. Components
10.4-5
6. Height
10.4-6
7. Building Orientation
10.4-7
8. Building Elevation
10.4-7
9. Fenestration
10.4-8
10. Primary Entrances
10.4-9
11. Shopfronts
10.4-9
12. Building Articulation
10.4-10
13. Slopes & Terraces
10.4-10
14. Liner Buildings
10.4-11
15. Mezzanines
10.4-11
B. Primary Building Types
1. Informal Building
10.4-13
2. Cottage
10.4-14
3. House
10.4-16
4. Bungalow
10.4-18
5. Duplex
10.4-20
6. Apartment House
10.4-22
7. Apartment Building
10.4-24
8. Townhouse
10.4-26
9. Shophouse
10.4-28
10. Live/Work Flex
10.4-30
11. Shop
10.4-32
12. Inn
10.4-34
13. Fabrication Building
10.4-36
14. Mixed-Use Building
10.4-38
15. Civic Building
10.4-40
C. Accessory Building Types
1. Barn
10.4-44
2. Farm Stand
10.4-46
3. Carriage House
10.4-48
4. Fabrication Shop
10.4-50
5. Accessory Shop
10.4-52
D. Components
1. Porch
10.4-54
2. Gallery
10.4-54
3. Side Wing
10.4-55
4. Rear Addition
10.4-55
5. Stoop
10.4-56
6. Connector
10.4-56
7. Cross Gable
10.4-57
8. Shed Dormer
10.4-57
9. Dormer Window
10.4-58
10. Bay Window
10.4-58
11. Balcony
10.4-59
12. Extended Shopfront
10.4-59
13. Turret
10.4-60
14. Arcade
10.4-60
15. Porte-Cochere
10.4-61
16. Portico
10.4-61
17. Canopy
10.4-62
18. Deck
10.4-62
19. Tower
10.4-63
20. Roof Deck
10.4-63
21. Cupola
10.4-64
E. Roof Types
1. Gable Roof
10.4-66
2. Hipped Roof
10.4-68
3. Mansard Roof
10.4-70
4. Gambrel Roof
10.4-72
5. Shed Roof
10.4-74
6. Flat Roof
10.4-76
F. Special Definitions
1. Definitions
10.4-78
Town of North Yarmouth Land Use Ordinance
Page 137 of 292
1. Number of Buildings
PURPOSE - To be able to effectively regulate the number of buildings allowed on a lot.
APPLICABILITY - Applies to all buildings and accessory buildings.
A. General
1. Multiple primary buildings may be built on each lot.
2. Multiple accessory buildings may be built on each lot.
3. An accessory building may not permanently occupy a lot without a primary building except:
a. On lots actively used for agricultural uses, the barn accessory building may occupy a lot
without a primary building.
b. An accessory building may be built on a lot prior to a primary building only if both the
primary and accessory buildings have been permitted according to the standards of this
Section.
2. Nonconforming Buildings
PURPOSE - To allow for the flexible modification, adaption, reuse, and expansion of buildings that existed
prior to and were made non-conforming by this Ordinance.
APPLICABILITY - Applies to all buildings, accessory buildings, and additional structures that existed prior
to the adoption of this Ordinance, and that do not meet all the standards of this Section.
A. General
1. Routine repair and maintenance of nonconforming buildings is permitted.
2. Nonconforming buildings may be altered to eliminate or reduce a nonconformity or to create
a conforming building type that meets the standards of this Ordinance.
3. The width and length of the main building mass of a nonconforming building may be
expanded within the allowed setbacks of the district and to the extent permitted by the
assigned building type.
4. A nonconforming building may be increased in height to the extent permitted by the assigned
building type, except when the floor to ceiling heights of the nonconforming building are
greater than those allowed for the assigned building type.
5. Nonconforming buildings may be expanded by adding components that meet the standards
of this Ordinance, except when the main building mass exceeds either of the maximum width
and length dimensions permitted by the assigned building type. In this case, the total square
footage of the building may not exceed the sum of the square footage that would be
permitted for a main building mass, rear wing, and side wing of the same building type.
6. When nonconforming buildings are expanded with permitted massing components, floor
height standards may be waived to allow floor heights to match.
Town of North Yarmouth Land Use Ordinance
Page 138 of 292
7. When nonconforming buildings are expanded, windows, doors, and roof shape may take the
form of the nonconforming building.
8. A nonconforming building may not be moved in whole or part to another location unless the
building conforms to the standards of the district to which the building is moved.
9. When the main building mass of a nonconforming building is destroyed and requires total
replacement, the building must be rebuilt to meet the standards of this Ordinance.
10. When any portion of a nonconforming building is damaged and does not require a total
reconstruction, it may be repaired and rebuilt to its previous condition.
11. Where a nonconforming building, including the main building mass or components, encroach
into setbacks, the building may be expanded vertically so long as the additions and
modifications otherwise meet the standards of this Ordinance.
3. Building Assembly
PURPOSE
To provide a clear and flexible system for enabling the construction of new buildings and the expansion
and modification of existing buildings.
To allow for a broad range of building designs.
APPLICABILITY - Applies to all primary buildings and accessory buildings.
A. General
1. All primary and accessory buildings must meet the standards for one of the building types
provided within this Ordinance.
2. Each primary building and accessory building must be comprised of a main building mass
with a rectangular form and a single allowed roof type.
3. The following building types are not required to take a rectangular form but must meet
standards for building dimensions, height, and setbacks: inn, civic building, and
fabrication building.
4. The outer wall of a main building mass must be located entirely in a single plane.
Deviations to the wall plane are allowed only through permitted articulations.
5. For the purpose of measurement, building length and width standards apply only to the
main building mass of primary and accessory buildings. Components have unique
dimensions and standards.
6. Integral components may be used to cut away space within the boundaries of the roof or
main building mass provided the eaves and ridge beam of the roof are not affected.
B. Attachments
1. Primary buildings may only attach to other primary buildings (or to their components) the
number of times indicated in Section B Primary Building Types.
Town of North Yarmouth Land Use Ordinance
Page 139 of 292
2. Accessory buildings may only attach to primary buildings or other accessory buildings (or
to their components) the number of times indicated in Section C Accessory Building Types.
3. Components may attach to primary and accessory buildings.
4. A building may not encroach on setbacks in order to attach to an adjacent building.
5. Primary buildings may attach to other primary buildings or to the components of other
primary buildings on no more than two sides.
6. Primary buildings that are allowed to attach to other primary buildings may do so on side or
rear walls only.
7. Where a building is allowed to attach to other buildings (or to its component), only one
building or component may attach to each building face.
8. Permitted attachments may occur across theoretical or legal lot lines.
9. Where two primary buildings attach, the division between buildings must be apparent on
the building's exterior though seams in materials, downspouts, pilasters, buttresses, or
other vertical structural elements that are less than 6 horizontal inches from the surface of
a building's facade.
10. A group of attached buildings, including their components, must provide gaps or breaks in
the street wall at intervals no greater than one hundred eighty (180) ft (measured from the
centerline of the break) along any frontage. These gaps may consist of on-site civic space,
a pedestrian or service thoroughfare, an extension of the adjacent sidewalk, or narrow side
yards.
11. Breaks must measure at least three (3) ft and no more than twelve(12) ft in width when
separating two buildings that do not share internal circulation.
12. Where breaks are required between two attached buildings that share circulation, the
hyphen component may be used to bridge the resulting gap between the two buildings
provided that through-block access is maintained at ground level through a public lobby,
passage, or archway and the hyphen is set back at least ten (10) ft from the frontage.
13. Breaks must measure at least ten (10) ft and no more than twelve (12) ft in width when
separating two buildings that share internal circulation.
14. A group of attached buildings, including their components, that share internal circulation
are limited in aggregate length to no more than 180 ft along any frontage.
15. When a group of attached buildings that share internal circulation includes a corner
building, the corner building is limited in width to seventy (70) ft along the secondary
frontage. Any additional gap between buildings may be closed using a side wing or rear
addition that has a roof type that is distinct from the main building mass.
D. Internal Circulation
1. Buildings must maintain an independent structural system, with the exception of party
walls, which are shared.
Town of North Yarmouth Land Use Ordinance
Page 140 of 292
2. Breaks in a party wall between two attached buildings may only occur in order to share
circulation, corridors, stairwells, and elevators.
3. First floor commercial units may share a unit between two or more attached buildings by
special permit.
4. Party walls must be structural, load bearing, and extend through the width of both
buildings to form a continuous wall.
5. The soffit along the frontage of a building may not encroach on a neighboring building lot.
E. Number of Units
1. Buildings have a maximum number of units as regulated in Section B Primary Building
Types and Section C Accessory Building Types.
2. If a permitted accessory building cannot be constructed due to site restrictions or other
design related concerns, the accessory unit associated with the accessory building may
be incorporated into the primary building, provided the total area of the accessory unit
does not exceed either thirty percent (30%) the area devoted to the buildings primary
unit, or the maximum floor area of the permitted accessory building, whichever is smaller.
4. Roofs
PURPOSE - To provide for buildings that have identifiable roof shapes based on local character.
APPLICABILITY - Roof standards apply to all primary and accessory building types and
components, with the exception of the civic building, which may have more unique and complex
assemblies.
A. General
1. The primary building mass, accessory building, or component may only employ one roof
type.
2. Pitched roofs must converge, symmetrically, to a single ridge beam at their highest point.
3. Shed roofs are considered to be symmetrical provided the vertical separation between the
base of the eaves and the top of the ridge beam is the same across the entire length of
the roof.
4. Asymmetrical roof assemblies are prohibited.
5. The upper slope of mansard and gambrel roof profiles must always be less steep than the
lower slope.
6. The highest point of the roof of any component must be lower than or equal to the highest
point of the roof of the primary building, unless specifically allowed to be taller.
Town of North Yarmouth Land Use Ordinance
Page 141 of 292
7. Gable ends must be located on the narrowest building face or component face, except
for townhouses, live-work/ flex buildings, and bungalows, which must orient the ridge
beam parallel with the frontage.
B. Nonconforming Roofs
1. Routine repair and maintenance of nonconforming roofs is permitted.
2. Nonconforming roofs may be altered to eliminate or reduce a nonconformity or to create
a conforming roof that meets the standards of this Ordinance.
3. When a nonconforming roof is damaged or destroyed, it may be repaired or rebuilt to its
previous condition.
4. Accessory buildings and components added to nonconforming buildings may use a roof
that takes the form and pitch of the nonconforming primary building.
5. Components
PURPOSE - To provide a clear and flexible system for enabling the construction of new buildings and
the expansion and modification of existing buildings.
APPLICABILITY - Applies to all primary buildings and accessory buildings.
A. General
1. At least one component is required per primary building except on the mixed-use building.
B. Attachments
1. All components may attach to other components, unless otherwise indicated.
2. All components are allowed to stack on top of one another, unless otherwise indicated.
3. Multiple components of the same type may be used more than once, unless otherwise
indicated.
4. Multiple components of the same type may not attach to each other, unless specifically
allowed, and must be separated horizontally by a distance of no less than one (1) ft.
5. Two components may not occupy the same space (overlap), unless specifically allowed
in Section D Components.
6. Any enclosed component that is permitted to extend flush with a side or rear lot line is
permitted to attach to a neighboring structure also built flush to the same lot line.
C. Encroachments
1. Components may encroach their entire width and/or depth into all setbacks, unless
specifically disallowed in Section D Components.
Town of North Yarmouth Land Use Ordinance
Page 142 of 292
2. Components may be allowed to encroach into the public right-of-way with authorization
from the Permitting Authority.
D. Nonconforming Components
1. Routine repair and maintenance of nonconforming components is permitted.
2. Nonconforming components may be altered to eliminate or reduce a nonconformity or to
create a conforming component that meets the standards of this Ordinance.
3. The dimensions of a nonconforming component may be expanded within the allowed
setbacks of the district and to the extent permitted by the assigned component type.
4. When a nonconforming component is destroyed and requires total replacement, the
component must be rebuilt to meet with the standards of this Ordinance.
5. When any portion of a nonconforming component is damaged and does not require a
total reconstruction, it may be repaired and rebuilt to its previous condition.
E. Fire Escapes
1. Fire escapes may be added to existing buildings when no other means of providing egress
is possible or practical.
2. Exterior fire escapes may encroach upon side and rear setbacks only.
3. Sizing and location of fire escapes must meet all local and state fire codes.
6. Height
PURPOSE - To create a predictable and clear approach to measuring and regulating height of
buildings.
APPLICABILITY - Applies to all new buildings or modifications to existing buildings that increase the
overall height of the structure.
A. Story Height
1. Building height in this Ordinance is measured in stories.
2. Story height is measured from the surface of any floor to the surface of the floor above it
or, if there is no floor above, from the surface of the floor to the top of the wall plate.
3. For buildings with pitched roofs, habitable space is allowed within the pitch and is not
considered a story.
4. A building that has more than one floor contained within the structure of a pitched roof
must count all but the top floor as a story.
5. A habitable floor within a pitched roof must be counted as a story if the roof rafters
intersect the wall plate or top of the exterior wall frame at a height more than two (2) feet
above the finished floor of the space.
6. Basements are counted as a story when five (5) feet or more of an exterior wall located
within the frontage zone is exposed above the average ground level.
Town of North Yarmouth Land Use Ordinance
Page 143 of 292
7. In the event that floor heights vary in different parts of the same building, such that
multiple stories in one area equate in height to one story in another, the shorter floor-to-
floor height should be used to determine number of stories, provided that none of the
floors are mezzanines.
B. Height Exceptions
1. Maximum height standards do not apply to mechanical equipment; vents or exhausts;
solar panels or skylights; flagpoles; chimneys; parapets; or other non-habitable
architectural features.
2. The maximum heights of roof decks, towers, turrets, and cupolas are regulated in Section
D Components.
3. Maximum height standards for Amateur (HAM) Radio Equipment, and wireless
telecommunications facilities are regulated by other Sections within this Ordinance.
7. Building Orientation
PURPOSE
To ensure that buildings address the street in a way that reinforces or creates the character
desired in a neighborhood.
To enable people to access the fronts of buildings.
To provide consistent placement of buildings within a neighborhood.
APPLICABILITY - Applies to all new primary buildings, accessory buildings, and components.
A. General
1. All primary buildings must front on a primary thoroughfare, with the exception of cottages,
bungalows and townhouses, which may front on alleys or civic space.
2. The facade of all primary buildings and accessory buildings, and massing components
must have the same orientation.
3. Buildings must be oriented parallel to the primary frontage line, with the following
exceptions:
a. In the case where a thoroughfare bends, a building may take the orientation of
adjacent buildings or orient toward the corner, at an angle determined by drawing an
imaginary line between the endpoints of the two side lot lines along the frontage.
b. Buildings that are part of a Pocket Neighborhood must be oriented parallel to the civic
space they face.
c. Building orientation may rotate by twenty two and a half degrees (22.5-) by waiver,
based on demonstrating that natural landscape features preclude meeting building
orientation standards and that those features were not man-made, modified, or
adjusted.
Town of North Yarmouth Land Use Ordinance
Page 144 of 292
8. Building Elevation
PURPOSE
To ensure that buildings with first floor residential uses are raised above the level of the ground
as a way to protect privacy where buildings are located close to the street.
To ensure that buildings with first floor commercial spaces are located at grade to the extent
possible to provide accessible shopfronts.
APPLICABILITY - Applies to all new primary buildings and accessory buildings with residential first
floor units.
A. General
1. Buildings must be elevated along their primary frontage to meet first floor elevation
requirements of each primary and accessory building type.
2. Buildings that are located within ten (10) ft of a frontage line must have the first floor at
the same grade or higher than the abutting sidewalk.
3. Primary buildings that contain dwelling units on a first floor frontage must be elevated
above grade a minimum of two (2) ft along the frontage, except for the following, which
may be built at grade:
a. Live/work flex buildings.
b. Accessory buildings.
4. First floor elevation is measured from the average ground level at the front of the building
to the top of the finished floor of the first story of a building.
9. Fenestration
PURPOSE
To ensure that buildings relate to the street by providing a rhythm of door and window openings.
To minimize blank walls along thoroughfares to keep eyes on the street.
APPLICABILITY - Applies to all new primary buildings, accessory buildings, and components, not
including civic buildings.
A. General
1. Fenestration requirements apply to all building facades, except where installation of
windows along side or rear property lines is infeasible due to separation requirements
mandated by the fire code.
2. The required fenestration percentages apply to the total area of each story of each building
facade as measured from the surface of the floor of that story, to the surface of the next
floor above; or, if there is no floor above, to either the top of the wall plate, or the base of
the buildings eaves, whichever is shorter.
Town of North Yarmouth Land Use Ordinance
Page 145 of 292
3. Windows and doors must have clear, transparent glass that has a minimum Visible Light
Transmission of fifty percent (50%) as indicated by the glass manufacturer.
4. All windows and doors on a building face must be square or vertical in proportion and
must have center or edge alignment that is vertical and horizontal, except as follows:
a. Stairwell windows may be circular, or take the shape of any regular polygon, other
than a triangle, taking the orientation of the roof pitch.
b. Shopfront windows are exempt.
5. Lifting, swinging, or sliding carriage house doors are not permitted within the frontage
zone, except for:
a. On commercial building facades, where doors must be comprised of fifty percent
(50%) transparent glass, with multiple vertically proportioned windows or window
lights combined to create horizontal compositions.
b. On accessory buildings.
c. On civic buildings.
6. Residential sliding doors and windows are prohibited along frontages.
7. Window and door openings may not vertically span more than one story, including floor
structures or mechanical systems.
8. Entrances to basements may not be located within the frontage zone.
9. To the extent possible, window and door patterns and window configurations should be
used to break the direct line of sight between neighboring properties to minimize privacy
impacts.
B. Nonconforming Fenestration
1. Routine repair, maintenance, and replacement of nonconforming windows and doors is
permitted.
2. Nonconforming windows and doors may be altered to eliminate or reduce a
nonconformity or to create conforming windows and doors that meet the standards of
this Ordinance.
3. Accessory buildings and components added to nonconforming buildings may use
window and door patterns that take the form and rhythm of the nonconforming primary
building.
10. Primary Entrances
PURPOSE
To ensure that buildings are accessible from thoroughfares as a way to encourage pedestrian
activity.
Town of North Yarmouth Land Use Ordinance
Page 146 of 292
To prevent extended blank walls that can cause a street to feel uncomfortable for pedestrians.
APPLICABILITY
All new primary buildings and accessory buildings.
Modifications to existing buildings that include a change in use to a commercial use.
A. General
1. At least one primary entrance must be located along the primary frontage of a primary
building's main building mass.
2. Cottages, houses, apartment houses, and duplexes may have their primary entrance on
the side of a primary building's main building mass, provided the side door is located
within the frontage zone.
3. Primary entrances must provide both ingress and egress and be operable and
permanently clear at all times.
4. On buildings that contain commercial uses, entrance doors must be provided at intervals
of no greater than every thirty (30) linear feet along first floor facades.
5. Primary entrance spacing requirements must be met for each building individually, in
that doors on adjacent buildings may not be used to meet the spacing requirement.
6. Primary entrance spacing is measured as the distance between the center line of doors
along a facade.
11. Shopfronts
PURPOSE - To ensure that areas intended for commercial activity have a shopfront treatment that
supports business vitality.
APPLICABILITY - The first floor facade of new primary and accessory buildings including
shophouses, mixed-use buildings, shops, accessory shops, and extended shopfronts.
A. General
1. Shopfronts must provide doors and windows with a minimum of seventy percent (70%)
glazing.
2. Shopfronts may include carriage house doors that meet the glazing requirements.
3. Buildings on corner lots with shopfronts must extend shopfront fenestration a minimum
of twelve (12) feet along the secondary frontage.
4. Entrance doors into publicly-accessible commercial units must be provided at intervals
of no greater than every twenty-five (25) linear feet along first floor facades.
Town of North Yarmouth Land Use Ordinance
Page 147 of 292
5. Glazing percentage requirements are based on the surface area of the shopfront.
Shopfront surface area is the first floor height multiplied by the total width of the first floor
of a building, measured at the frontage.
6. The area of a commercial unit is determined by the first floor height multiplied by
horizontal distance between the interior walls of the unit, measured at the frontage.
7. Where a shopfront does not extend across a building's entire facade, the area of the
shopfront must be determined by the first floor height multiplied by the total width of the
commercial unit.
B. Nonconforming Shopfronts
1. Routine repair and maintenance of nonconforming shopfronts is permitted.
2. Nonconforming shopfronts may only expand along a frontage if primary entrance, door
and window, and building type standards are met.
12. Building Articulation
PURPOSE
To enable buildings that contribute to the overall character of a street.
To minimize exaggerated building articulations that can interrupt pedestrian movement and
result in a disorienting built environment.
APPLICABILITY - Applies to new buildings.
A. General
1. Architectural features and small articulations less than six (6) horizontal inches from the
surface of a building's facade are permitted.
2. Forecourts are permitted on mixed-use buildings, apartment buildings, fabrication
buildings, and civic buildings, provided they meet the following standards:
a. Only one building facade may have a forecourt.
b. Forecourts must provide access to the first floor of a building with the same frequency
of windows and doors as the facade it is associated with.
c. The width of a forecourt must be no greater than 1/3 of the building face to which it is
associated.
d. The maximum depth of a forecourt must maintain a ratio of 1:1 with the height of the
associated building face, measured from the surface of the forecourt to the base of
the eaves or top of the parapet.
e. The average elevation of the floor of a forecourt must not exceed one (1) ft above the
abutting sidewalk.
Town of North Yarmouth Land Use Ordinance
Page 148 of 292
f.
Courtyards located away from the frontage are allowed for mixed-use buildings,
apartment buildings, fabrication buildings, and civic buildings, but their dimensions,
shape, and size are not regulated by this Ordinance.
g. Arcades, may extend across the gap created by a forecourt to create a peristyle,
provided they are not enclosed by glass, railings, or other physical obstructions.
3. Corner buildings with first floor shopfronts may have a chamfered corner, provided the
length of the resulting chamfer face is less than 12 feet and that both edges of the chamfer
are equidistant from the corner.
a. Chamfered corners must provide an entrance. This entrance may not be counted
toward the primary entrance spacing requirement.
b. Mixed use buildings may extend the chamfer to upper stories as desired. All other
building types must limit the chamfer to the first floor only.
13. Slopes & Terraces
PURPOSE
To ensure that buildings located in mixed-use areas meet the sidewalk.
To allow terraces as a way to provide pedestrian circulation adjacent to shopfronts on streets
with steep slopes.
APPLICABILITY - Applies to new buildings or existing buildings that want to construct a terrace.
A. General
1. Buildings with a zero (0) ft front setback must provide entrances at grade to the abutting
sidewalk.
2. Shopfronts must step down entrances to meet the grade of the adjacent sidewalk along
the frontage.
3. If a building with a zero (0) ft setback is located on a sloped frontage, the first floor of
each commercial unit must match the average elevation of the abutting sidewalk along
the frontage of each commercial unit.
4. When the grade of a thoroughfare at a primary or secondary frontage has a slope of ten
percent (10%) or greater, the adjacent buildings may provide a level terrace in their front
setback.
5. The following standards apply to buildings that are set back less than twelve (12) ft from
the street:
a. The terrace must be paved to match the adjacent sidewalk.
b. A railing or low wall must be provided wherever the terrace is elevated more than one
(1) ft above grade.
Town of North Yarmouth Land Use Ordinance
Page 149 of 292
c. Stairs may be provided between abutting terraces to promote pedestrian circulation
along shopfronts.
d. When applied, terraces must extend along the entire frontage of the building.
6. The following standards apply to all buildings with a setback greater than twelve (12) ft:
a. The terrace must be surfaced with grass or other vegetation with the exception of
permitted patios, or driveways, sidewalks, or walkways that cross the terrace.
b. The lot may be terraced for all, or a portion, of its frontage.
c. The terrace may provide steps to the adjacent sidewalk anywhere along the frontage.
14. Liner Buildings
PURPOSE - Liner buildings are a tool to help create or maintain an active and safe street.
APPLICABILITY - Liner building standards apply to any building, use, or lot where a liner building is
used to provide parking lot screening.
A. General
1. Buildings that may be used as liner buildings include, the mixed use building, townhouse,
and live/work flex.
2. Liner buildings must be placed between the building, lot, or use being lined, and the
abutting thoroughfare according to the following standards:
a. The total length of liner buildings along a facade being lined should be at least fifty
percent (50%) the length of that facade.
b. Gaps in the liner may not exceed twenty (20) ft in continuous length.
c. Liner buildings are only required along the ground floor frontage of the building, lot,
or use being lined, but may extend taller.
3. Liner buildings may occupy the same lot as the building, lot, or use being lined, and may
share internal circulation, structural system, and individual units between them in the
manner of a single building.
15. Mezzanines
PURPOSE - To allow partial floors.
APPLICABILITY - Applies to construction of mezzanines in new buildings or existing buildings.
A. General
1. Publicly accessible mezzanines may be provided within a building story with the following
standards:
Town of North Yarmouth Land Use Ordinance
Page 150 of 292
a. A building story must be at least eighteen (18) ft in height to accommodate a public
mezzanine.
b. A public mezzanine must have a ceiling height of at least eight (8) ft measured from
the finished floor of the mezzanine to the surface of the finished ceiling or underside
of the structural members of an unfinished ceiling.
c. The area of a public mezzanine may be no greater than fifty percent (50%) the area
of the main floor beneath it.
2. Utility or mechanical mezzanines, intended only for access by repair personnel, may be
provided within a full building story with the following standards:
a. A building story must be at least fifteen (15) ft in height to accommodate a
mechanical mezzanine.
b. Mechanical mezzanines may be designed as a crawlspace, and have a minimum
ceiling height of four (4) ft.
c. Mechanical mezzanines may be no greater than seventy-five percent (75%) the area
of the main floor beneath them.
3. From the exterior of the building, mezzanines should appear like part of the story they
are associated with. A mezzanine may not appear like a complete building story from the
outside.
Town of North Yarmouth Land Use Ordinance
Page 151 of 292
Town of North Yarmouth Land Use Ordinance
Page 152 of 292
Town of North Yarmouth Land Use Ordinance
Page 153 of 292
Town of North Yarmouth Land Use Ordinance
Page 154 of 292
Town of North Yarmouth Land Use Ordinance
Page 155 of 292
Town of North Yarmouth Land Use Ordinance
Page 156 of 292
Town of North Yarmouth Land Use Ordinance
Page 157 of 292
Town of North Yarmouth Land Use Ordinance
Page 158 of 292
Town of North Yarmouth Land Use Ordinance
Page 159 of 292
Town of North Yarmouth Land Use Ordinance
Page 160 of 292
Town of North Yarmouth Land Use Ordinance
Page 161 of 292
Town of North Yarmouth Land Use Ordinance
Page 162 of 292
Town of North Yarmouth Land Use Ordinance
Page 163 of 292
Town of North Yarmouth Land Use Ordinance
Page 164 of 292
Town of North Yarmouth Land Use Ordinance
Page 165 of 292
Town of North Yarmouth Land Use Ordinance
Page 166 of 292
Town of North Yarmouth Land Use Ordinance
Page 167 of 292
Town of North Yarmouth Land Use Ordinance
Page 168 of 292
Town of North Yarmouth Land Use Ordinance
Page 169 of 292
Town of North Yarmouth Land Use Ordinance
Page 170 of 292
Town of North Yarmouth Land Use Ordinance
Page 171 of 292
Town of North Yarmouth Land Use Ordinance
Page 172 of 292
Town of North Yarmouth Land Use Ordinance
Page 173 of 292
Town of North Yarmouth Land Use Ordinance
Page 174 of 292
Town of North Yarmouth Land Use Ordinance
Page 175 of 292
Town of North Yarmouth Land Use Ordinance
Page 176 of 292
Town of North Yarmouth Land Use Ordinance
Page 177 of 292
Town of North Yarmouth Land Use Ordinance
Page 178 of 292
Town of North Yarmouth Land Use Ordinance
Page 179 of 292
Town of North Yarmouth Land Use Ordinance
Page 180 of 292
Town of North Yarmouth Land Use Ordinance
Page 181 of 292
Town of North Yarmouth Land Use Ordinance
Page 182 of 292
Town of North Yarmouth Land Use Ordinance
Page 183 of 292
Town of North Yarmouth Land Use Ordinance
Page 184 of 292
Town of North Yarmouth Land Use Ordinance
Page 185 of 292
Town of North Yarmouth Land Use Ordinance
Page 186 of 292
Town of North Yarmouth Land Use Ordinance
Page 187 of 292
Town of North Yarmouth Land Use Ordinance
Page 188 of 292
Town of North Yarmouth Land Use Ordinance
Page 189 of 292
Town of North Yarmouth Land Use Ordinance
Page 190 of 292
Town of North Yarmouth Land Use Ordinance
Page 191 of 292
Town of North Yarmouth Land Use Ordinance
Page 192 of 292
Town of North Yarmouth Land Use Ordinance
Page 193 of 292
Town of North Yarmouth Land Use Ordinance
Page 194 of 292
Town of North Yarmouth Land Use Ordinance
Page 195 of 292
Town of North Yarmouth Land Use Ordinance
Page 196 of 292
Town of North Yarmouth Land Use Ordinance
Page 197 of 292
Town of North Yarmouth Land Use Ordinance
Page 198 of 292
Town of North Yarmouth Land Use Ordinance
Page 199 of 292
Town of North Yarmouth Land Use Ordinance
Page 200 of 292
Town of North Yarmouth Land Use Ordinance
Page 201 of 292
Town of North Yarmouth Land Use Ordinance
Page 202 of 292
Town of North Yarmouth Land Use Ordinance
Page 203 of 292
Town of North Yarmouth Land Use Ordinance
Page 204 of 292
Town of North Yarmouth Land Use Ordinance
Page 205 of 292
Town of North Yarmouth Land Use Ordinance
Page 206 of 292
Town of North Yarmouth Land Use Ordinance
Page 207 of 292
Town of North Yarmouth Land Use Ordinance
Page 208 of 292
Town of North Yarmouth Land Use Ordinance
Page 209 of 292
Town of North Yarmouth Land Use Ordinance
Page 210 of 292
Town of North Yarmouth Land Use Ordinance
Page 211 of 292
Town of North Yarmouth Land Use Ordinance
Page 212 of 292
Town of North Yarmouth Land Use Ordinance
Page 213 of 292
Town of North Yarmouth Land Use Ordinance
Page 214 of 292
Town of North Yarmouth Land Use Ordinance
Page 215 of 292
Town of North Yarmouth Land Use Ordinance
Page 216 of 292
Town of North Yarmouth Land Use Ordinance
Page 217 of 292
Town of North Yarmouth Land Use Ordinance
Page 218 of 292
Town of North Yarmouth Land Use Ordinance
Page 219 of 292
Town of North Yarmouth Land Use Ordinance
Page 220 of 292
Town of North Yarmouth Land Use Ordinance
Page 221 of 292
Town of North Yarmouth Land Use Ordinance
Page 222 of 292
Town of North Yarmouth Land Use Ordinance
Page 223 of 292
SECTION 10.5 COMMUNITY FACILITIES IMPACT ANALYSIS AND MITIGATION
After reviewing the complete application and receiving comments as deemed appropriate by the Planning
Board, the Board may require the applicant to conduct an analysis of the impact of the proposed
development upon the environment, public or municipal facilities and services including, but not limited to,
schools, sewer, water, streets, solid waste and drainage, or mitigating any negative impact on the said
environment, public or municipal facilities or services, or decline in the level of such services resulting from
the proposed development. Once completed, the analysis shall be submitted to the Planning Board and
any other appropriate public agency, board or department for review and comment. When it is
demonstrated that the proposed development will result in a negative impact to the environment or to the
community facilities or services, the Planning Board may require the applicant to make appropriate
improvement to the environment or to the community facilities or services, or to provide for acceptable
improvements as a condition of plan approval. Should the application or plans for the proposed
development necessitate retaining the services of outside professional expertise by the Planning Board to
review same, the costs shall be borne by the applicant.
SECTION 10.6 DRIVE THROUGH FACILITES [AMENDED 6/19/21]
Any use that provides drive-through service must be located and designed to minimize the impact on
neighboring properties and traffic circulation. No drive- through facility shall be located in the area of the
site adjacent to a residential use. Communication systems must not be audible on adjacent properties in
residential use. Vehicular access to the drive-through shall be through a separate lane that prevents
vehicle queuing within the normal parking area. Adequate queuing space must be provided to prevent
any vehicles from having to wait on a public street, within the entry from the street. The drive-through
must not interfere with any sidewalk or bicycle path
SECTION 10.7 EROSION AND SEDIMENTATION CONTROL
A. All subdivision, building, site, and roadway designs and layouts must harmonize with existing
topography and conserve desirable natural surroundings to the fullest extent possible, such that
filling, excavation and earth moving activity must be kept to a minimum. Parking lots on sloped sites
must be terraced to avoid undue cut and fill. Natural vegetation must be preserved and protected
wherever possible.
B. Erosion and sedimentation control measures shall be designed and implemented according to the
"Maine Erosion and Sedimentation Control Best Management Practices" by the Maine Department
of Environmental Protection (most current edition); except to the extent a specific provision on this
Ordinance is more restrictive than the provision in this reference manual.
1. Stripping of vegetation, soil removal, and re-grading or other development shall be
accomplished in such a way as to minimize erosion.
2. The duration of soil exposure of the disturbed area shall be kept to a practical minimum. In
environmentally sensitive areas, within one hundred (100) feet of bodies of water or a wetland,
soils may not be left exposed for more than seven (7) days.
3. Temporary vegetation, organic mulches (hay, straw, wood chips, etc.), chemical mulches (wood
fiber emulsions), siltation fabrics, and/or mats, or combinations thereof, shall be used to protect
exposed areas during development. Environmentally sensitive areas shall be protected by silt
fencing and additional temporary measurers at all times.
Town of North Yarmouth Land Use Ordinance
Page 224 of 292
4. Permanent (final) vegetation and mechanical erosion control measures shall be installed prior
to the completion of construction, but no later than thirty (30) days after completion of the
construction.
5. Until a disturbed area is stabilized, sediment in the runoff water shall be trapped by the use of
sediment basins or silt traps. The discharge from the basin should be sheet flow through a
vegetated filter strip.
6. The top of a cut or the bottom of a fill section shall not be closer than ten (10) feet to an adjoining
property unless otherwise mutually agreed to by the affected landowner and the town but in no
instance shall said cut or fill exceed a 2:1 slope.
7. During grading operations, methods of dust control shall be employed.
8. On slopes greater than twenty-five percent (25%) there shall be no grading or filling within one
hundred (100) feet of the normal high water mark of a water body except to protect the shoreline
and prevent erosion.
9. All erosion control measures shall be monitored periodically by the applicant and inspected after
each rainstorm for signs of failure (erosion, displacement or mulch, etc.). If any of the soil is
exposed, re-mulching is required. If erosion or washouts occur, the area must be re-graded and
preventative measures re-installed. The site shall be monitored until 95 percent of the
permanent grasses or other vegetation is firmly established.
C. Soil Erosion and Control Plan: The Code Enforcement Officer or Planning Board shall require a
written soil erosion and sedimentation control plan when the disturbed area is larger than twenty
thousand (20,000) square feet per acre. A written soil erosion and sedimentation control plan shall
be required for all developments that remove the natural vegetation and disturb the soil within the
Royal River Corridor Overlay District.
SECTION 10.8 EMISSIONS
Emission of dust, ash, smoke or other particulate matter which can cause damage to human or animal
health, vegetation or property by reason of concentration or toxicity, or which can cause soiling beyond
property boundaries shall be prohibited. The emission of non-farming odors in such quantities, as
determined by the CEO, to be offensive at the lot boundaries, is prohibited. Residential heating devices
are exempt from these requirements.
SECTION 10.9 EXTERIOR LIGHTING
A. The proposed development must have adequate exterior lighting to provide for its safe use during
nighttime hours, if such use is contemplated.
B. The permitting authority (CEO, Planning Board) may require street lighting along streets, parking
areas, at intersections and crosswalks and where various types of circulation systems merge,
intersect or split.
C. Lighting may be used which serves security, safety and operational needs but which does not
directly or indirectly produce deleterious effects on abutting properties or which would impair the
vision of a vehicle operator on adjacent roadways.
Town of North Yarmouth Land Use Ordinance
Page 225 of 292
D. Lighting fixtures must be shielded or hooded so that the lighting elements are not exposed to normal
view by motorists, pedestrians, or from adjacent dwellings and so that they do not unnecessarily
light the night sky. Direct or indirect illumination must not exceed 0.5 foot-candles at the lot line or
upon abutting residential properties.
E. Blinking lights are prohibited, unless they are necessary for safety reasons.
F. The maximum height of freestanding lighting shall be the same as the principal building or not
exceed thirty-five (35) feet.
G. Spot light type fixtures attached to buildings shall be prohibited unless there is a demonstrated
safety or security need for them.
SECTION 10.10 FINANCIAL AND TECHNICAL CAPACITY
A. The applicant shall have adequate financial resources to construct the proposed improvements and
meet the standards of these regulations. When the applicant proposes to construct the buildings as
well as the development improvements, the applicant shall have adequate financial resources to
construct the total development. In making the above determinations the Board shall consider the
proposed time frame for construction and the effects of inflation. Evidence of financial capacity
should be in the form of a letter from a bank or other source of financing indicating the name of the
project, amount of financing proposed or available, and individual's or institution's interest in
financing the project or in the form of a letter from a certified accountant or annual report indicating
that the applicant has adequate cash flow to cover anticipated costs.
B. The applicant shall retain qualified contractors and consultants to supervise, construct and inspect
the required improvements in the proposed development. In determining the applicant's technical
ability the Board shall consider the applicant's previous experience, the experience and training of
the applicant's consultants and contractors, and the existence of violations of previous approvals
granted to the applicant.
SECTION 10.11 FLOODPLAIN MANAGEMENT [AMENDED 6/17/24]
A. Site Plan Review/Subdivision Requirement: All developments and subdivisions shall include
written certification as to the location of the 100-year floodplain boundary to include a map of the
100-year floodplain boundary overlaid onto a U.S.G.S. Quadrangle Map or other topographic map
by a professional land surveyor, registered professional engineer or architect. The determination
shall be based on engineering practices recognized by the Federal Emergency Management
Agency (FEMA) and the provisions of the town's Floodplain Management Ordinance, including the
most recent FEMA maps for the town. All proposals include base flood elevations, flood boundaries,
and, in a riverine 100-year floodplain, floodway data. These determinations shall be based on
engineering practices recognized by FEMA.
B. Buildings Prohibited on Floodplains:
1. Buildings are prohibited within the 100-year floodplain area as identified by FEMA on the town's
Flood Insurance Rate Maps and Flood Hazard Boundary Maps.
2. The development plan should include a statement that building is prohibited on the 100-year
floodplain, and the restriction shall be included in any deed, lease, purchase and sale
agreement, or document transferring or expressing intent to transfer any interest in real estate
or structure.
3. 100-year floodplains may be used as woodlands, grassland, pastureland and for passive
Town of North Yarmouth Land Use Ordinance
Page 226 of 292
outdoor recreation.
4. Piers, docks, wharves, bridges and boat ramps and associated parking are permitted within the
100-year floodplain pursuant to Section 9.1. Residential Shoreland District and Resource
Protection District Performance Standards and the town's Floodplain Management Ordinance.
SECTION 10.12 HAZARDOUS, SPECIAL, AND RADIOACTIVE MATERIALS [AMENDED 6/17/24]
A. The handling, storage, and use of all materials identified by the standards of a federal or state
agency as hazardous, special or radioactive must be done in accordance with the standards of
these agencies. No flammable or explosive liquids, solids or gases shall be stored in bulk above
ground unless they are located at least seventy-five (75) feet from any lot line, or forty (40) feet in
the case of underground storage. All materials must be stored in a manner and location that is in
compliance with appropriate rules and regulations of the Maine Department of Public Safety and
other appropriate federal, state, and local regulations.
B. Reporting Requirement: Commercial, industrial and other activities that utilize, store or dispose
of "reportable" quantities of hazardous or toxic materials shall submit an annual certification that
these materials are being handled so as to prevent environmental degradation. "Reportable" means
that these companies must file a report with the Maine Department of Environmental Protection.
C. Home Heating Fuel Tanks and Fuel Storage. Propane tanks, or other tanks with liquefied gaseous
fuels are allowed. Home Heating fuel tanks and fuel storage of 660 gallons or less is allowed with
all residential uses.
SECTION 10.13 HISTORIC AND ARCHAEOLOGICAL SITES
A. If any portion of the site has been identified as containing historic or archaeological resources listed
on the National Register of Historic Places, or preliminarily determined to be eligible for listing on the
Register, the development must include appropriate measures for protecting these resources,
including but not limited to modification of the proposed design of the site, timing of construction,
and limiting the extent of excavation.
B. Any proposed land use activity involving structural development or soil disturbance on or adjacent
to sites listed on, or eligible to be listed on the National Register of Historic Places, as determined
by the CEO or Planning Board shall be submitted by the applicant to the Maine Historic Preservation
Commission for review and comment, at least thirty (30) days prior to action being taken by the
permitting authority. The permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
SECTION 10.14 LANDSCAPING, BUFFERS AND SCREENING
A. Purpose: The purpose of landscaping, buffers and screening is to define, soften and/or screen the
appearance of off-street parking areas or other uses from the public right-of-way and abutting
properties, to enhance the physical design of the building(s) and site, and to minimize the
encroachment of the proposed use on neighboring land uses.
B. Standards:
1. Landscaping:
a. The landscape shall be preserved in its natural state, insofar as practicable, by minimizing
tree and soil removal, retaining existing vegetation where desirable, and keeping any grade
changes in character with the general appearance of neighboring areas.
Town of North Yarmouth Land Use Ordinance
Page 227 of 292
b. Landscaping shall be provided along public roads, in public areas, in recreation sites and
adjacent to buildings.
c. Deciduous trees should have at least a two-inch caliper at planting and evergreens should
be at least four feet tall. Wherever possible, existing large trees should be clumps of trees
rather than individual ones. Invasive plants species should be avoided.
d. Landscaping shall be provided as part of the overall site plan design and integrated into
building arrangements, topography, parking and buffering requirements. Landscaping shall
include trees, bushes, shrubs, ground cover, perennials, annuals, plats, grading and the use
of building and paving materials in an imaginative manner.
2. Buffers and Screening:
a. Development must provide for the buffering of adjacent uses where there is a transition from
one type of use to another use and for screening of mechanical equipment and service and
storage areas.
b. Buffering must be designed to provide a year-round visual screen in order to minimize
adverse impacts. It may consist of fencing, evergreens, berms, rocks, boulders, mounds, or
a combination thereof.
c. Landscaping around and within parking lots shades hot surfaces and visually "softens" the
hard surface look of parking areas. Parking areas must be designed and landscaped to
create a pedestrian-friendly environment. A landscaped border must be created around
parking lots. Any parking lot containing ten (10) or more parking spaces must include one
(1) or more landscaped islands within the interior of the lot. There must be at least one (1)
island for every twenty (20) spaces. Landscaping must screen the parking area from
adjacent residential uses and from the street. Sight vision, safety and appearance should be
considered in determining landscaping plans.
d. Garbage collection areas, utility storage areas and similar accessory areas and structures
should be buffered.
e. A development must provide sufficient buffering when topographical or other barriers do not
provide reasonable screening and where there is a need to: shield neighboring properties
from any adverse external effects of the development, or shield the development form the
impact of adjacent uses.
f.
The width of the buffer may vary depending on the treatment of the area. Within densely
built- up areas, a buffer with dense plantings, fencing, or changes in grade may be as little
as five (5) feet in width. A buffer with moderate levels of planting should be ten (10) feet to
fifteen (15) feet in width. In suburban and rural settings, the width of the vegetated buffer
should be increased to a minimum of twenty-five (25) feet. Areas adjacent to service, loading,
or storage areas should be screened by dense planting, berms, fencing, or a combination
thereof with a width of a minimum of five (5) feet.
SECTION 10.15 NATURAL BEAUTY AND AESTHETICS IN THE FARM AND FOREST DISTRICT,
RESIDENTIAL SHORELAND DISTRICT AND RESOURCE PROTECTION DISTRICT
In the Farm and Forest District, Residential Shoreland District and Resource Protection District,
development in which the land cover type at the time of application is forested shall maintain a wooded
buffer strip no less than fifty (50) feet in width along all existing public roads. The buffer may be broken
only for driveways and streets. To the extent practical, building locations shall be at the periphery of open
fields, and shall be located within forested portions of the development. When the development contains
Town of North Yarmouth Land Use Ordinance
Page 228 of 292
no forest or insufficient forested portions to include all buildings, the development shall be designed to
minimize the appearance of buildings when viewed from existing public streets.
SECTION 10.16 NOISE
A. The development must control noise levels such that it will not create a nuisance for neighboring
properties.
B. The maximum permissible sound pressure level of any continuous, regular or frequent or
intermittent source of sound produced by any activity on the site shall be limited by the time period
and by the abutting land use as listed below. Sound levels shall be measured at least 4 feet above
ground at the property boundary of the source.
Sound Pressure Level Limits Using
The Sound Equivalent Level of One Minute (leq 1) (Measured in dB(a) Scale)
Abutting Use
6 a.m. to 10 p.m.
10 p.m. to 6 a.m.
Residential
55
45
Public, Semipublic and Institutional
60
55
Vacant or Rural
60
55
Commercial
65
55
Industrial
70
60
C. Noise shall be measured by a meter set on the A-weighted response scale, fast response. The
meter shall meet the American National Standards Institute (ANSI S1 4- 1961) 'American Standards
Specification for General Purpose Sound Level Meters'.
SECTION 10.17 SEWAGE DISPOSAL [AMENDED 4/30/22]
A. Subsurface Sewage Disposal:
1. All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules (Rules). The applicant shall submit evidence of
site suitability for subsurface sewage disposal prepared by a Maine Licensed Site Evaluator in
full compliance with the requirements of the Rules. When sewage disposal is to be
accomplished by sub-surface sewage disposal systems, test pit analysis, prepared by a licensed
Site Evaluator shall be provided. A map indicating the location of all test pits dug on the site shall
be submitted.
2. No on-site sewage treatment and disposal system greater than two thousand (2,000) gallon-per-
day capacity shall be approved until the applicant has conducted a hydrogeologic assessment
pursuant to Section Water Quality, Subsection D. that demonstrates the following:
a. The soils are suitable for the expected volume and characteristics of the waste;
b. The direction of groundwater flow and subsurface conditions are such as not to imperil
proposed on-site and off-site water supplies; and
c. The quality of groundwater at the property line is maintained within federal drinking water
standards. The applicant shall base hydrogeologic assessment on soil borings and
monitoring wells sufficient to document existing soil, bedrock and groundwater conditions.
d. As a condition of approval, the applicant may be required to install monitoring wells prior to
the installation of the subsurface sewage disposal system. The location of the monitoring
wells and recommendations for sampling and analysis shall be prepared by a Maine Certified
Geologist. The sampling and analysis shall continue for an appropriate time period to
Town of North Yarmouth Land Use Ordinance
Page 229 of 292
demonstrate that groundwater quality is maintained.
e. The applicant may also be required to submit copy of the operations and maintenance
manual for the subsurface wastewater disposal system.
f.
In the case of a brewery, winery, or distillery the Planning Board may require:
1. The applicant to escrow funds for a third-party engineer to review the design of the
wastewater disposal system and its safe containment system in order to prevent potential
contamination to the area water supply.
2. A document from the State of Maine verifying the wastewater disposal standards have
been met.
B. Public Sewer System Disposal:
1. Sewer lines that connect to a municipal sewer system shall not be permitted in the Farm and
Forest District, Residential Shoreland District or Resource Protection District. The Planning
Board may waive this provision for developments proposed for the "Transitional Residential
District" as described within the Comprehensive Plan.
2. In cases where municipal sewerage is proposed, the system shall conform to the standards of
the servicing sewer district. The reviewing entity shall require a statement from the sewer district
that states whether capacity is available for the project.
SECTION 10.18 SIGNS [AMENDED 6/17/24]
A. For general sign standards, refer to Section 8.7 Signs.
B. Subdivision Standards
a. Permanent signs identifying a subdivision shall meet the requirements set forth in Section 8.7
Signs and also shall be subject to approval pursuant to the standards set forth in Section 5
Subdivision Review and Criteria.
C. Site Plan Review Standards
a. Municipal and Public Safety signs that do not comply with Town Ordinances require Site Plan
Review approval by Planning Board.
SECTION 10.19 SOIL SUITABILITY
No land alteration or development shall be permitted in any area where the soil is rated severe or very
severe for the proposed activity, according to the Cumberland County Soil Suitability Guide of the U.S.
Resource Conservation Service, unless satisfactory on-site evidence is presented to the CEO or Planning
Board, with the application for a permit, that construction methods will overcome any pertinent soil
inadequacies. If modification of the soil is made meeting the requirements of U.S. Resource Conservation
Service for upgrading the area to a rating of "fair" or high, building on the soils initially rated as poor or
lower may be permitted.
SECTION 10.20 SOLID WASTE DISPOSAL
A. Proposed developments must provide for adequate disposal of solid wastes, including shingles,
lumber, stumps and other construction debris. All solid waste must be disposed of at a licensed
disposal facility having adequate capacity to accept the project's wastes.
Town of North Yarmouth Land Use Ordinance
Page 230 of 292
B. If additional solid waste from the proposed development exceeds the capacity of the municipal solid
waste disposal services, causes the town to no longer be in compliance with its license from the
Department of Environmental Protection, or causes the town to exceed its contract with a non-
municipal facility, the applicant shall make alternative arrangements for the disposal of solid waste.
The alternative arrangements shall be at a disposal site, which is in compliance with its license. The
Planning Board may not require the alternative arrangement to exceed a period of five (5) years.
SECTION 10.21 STORAGE OF MATERIALS
A. Exposed non-residential storage areas, exposed machinery, and areas used for the storage or
collection of discarded automobiles, auto parts, metals or other Sections of salvage or refuse must
have sufficient setbacks and screening (such as a stockade fence or a dense evergreen hedge) to
provide a visual buffer sufficient to minimize their impact on abutting residential uses and users of
public roads.
B. All dumpsters or similar large collection receptacles for trash or other wastes must be located on
level surfaces that are paved or graveled. Where the dumpster or receptacle is located in a yard
which abuts a residential or institutional use or a public road, it must be screened by fencing or
landscaping.
C. Where a potential safety hazard to children is likely to arise, physical screening sufficient to deter
small children from entering the premises must be provided and maintained in good condition.
D. All buffers and screening shall be in accordance with Section 10.13. Landscaping, Buffers and
Screening
SECTION 10.22 STORM WATER CONTROL
A. All new construction and development shall be designed to minimize increases in peak rates of
storm water runoff from the site in excess of the natural predevelopment conditions. Adequate
provisions must be made for the collection and disposal of all storm water that runs off proposed
roads, parking areas, roofs, and other surfaces, through a storm water drainage system and
maintenance plan, which must not have adverse impacts on abutting or downstream properties.
Peak discharge rates should be limited to the predevelopment levels for the 2-year, 10-year, and
25-year frequency, 24-hour duration storm. Where possible, existing natural runoff control features,
such as berms, swales, terraces and wooded areas, shall be retained in order to reduce runoff and
encourage infiltration of storm waters. The best management practices as set forth by the Maine
Department of Environmental Protection shall be used as a guide for compliance with this
requirement, except to the extent a specific provision on this Ordinance is more restrictive than the
provision in this reference manual.
B. Requirements: The Planning Board may require the installation of ditches, catch basins, piping
systems, and other appurtenances for the conveyance, control, or disposal of surface waters. The
Planning Board shall require the preparation of a storm water management plan by a Maine
registered professional engineer when more than twenty thousand (20,000) square feet of land is to
be disturbed.
In addition, the Planning Board may require the following:
1. Where a development is traversed by a stream, river or surface water drainage-way, or where
the Board believes that surface water runoff to be created by the development should be
controlled, there shall be provided easements or drainage rights-of-way with swales, culverts,
catch basins or other means of channeling surface water within the subdivision and over other
properties. The storm water management system shall be designed by a Maine registered
Town of North Yarmouth Land Use Ordinance
Page 231 of 292
professional engineer.
2. Drainage easements for existing water courses or proposed drainage ways at least thirty (30)
feet wide shall be provided and indicated on the plan conforming substantially with the lines of
existing natural drainage.
3. The biological and chemical properties of the receiving waters must not be degraded by the
storm water runoff from the development site. The use of oil and grease traps in manholes, the
use of on-site vegetated waterways, and vegetated buffer strips along waterways and drainage
swales, and the reduction in use of deicing salts and fertilizers may be required, especially where
the development storm water discharges within the Groundwater Protection Overlay District.
4. The developer shall provide a statement from the designing engineer that the proposed
development will not create erosion, drainage or runoff problems either in the development or
in other properties. The peak runoff from the development onto other properties shall not be
increased.
5. Storm water runoff control systems shall be designed in conformance with the Town of North
Yarmouth Street Design and Construction Standards Section V. as applicable.
6. Maintenance Plan: Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning over the long-term. The Planning Board may require that a written
maintenance plan be submitted with the Plan.
SECTION 10.23 RECREATION AND OPEN SPACE LAND [AMENDED 6/19/21; 4/30/22; 6/17/24]
A. Applicability and Purpose: This section is applicable to developments proposed for the Village
Center District and the Village Residential District. The purpose of these provisions is to provide for
the development of useable open space and recreation land within residential neighborhoods, to
include, but not limited to: playgrounds, ball fields, picnic areas, passive open space, and networks
of inter-connected trails, walkways and bicycle paths. Landscaping of these areas should be
designed to enhance their use for recreation while providing privacy for individual homeowners.
B. Retention of Useable Open Space and Recreation Land:
1. The Planning Board shall require the reservation of land for proposed or future parks,
playgrounds, trails, walkways, bicycle paths, or conservation areas to benefit the residents of
the proposed development and the general public. Reserved land must be of suitable dimension,
topography and general character for the proposed recreational use and must be reasonably
accessible to residents of the development and the public. This land shall be designated as
Common Open Space and Recreation Land.
2. The percentage of useable open space and/or recreational land to be reserved shall depend on
the identified needs for outdoor recreation in the portion of the town in which the development
is located, the proposed lot sizes within the development, the expected demographic makeup
of the occupants of the development, and the site characteristics. The following table provides
guidelines for determining the amount of useable open space and recreation land that should be
set-aside in developments.
3. At least seventy five percent (75%) of the common open space shall be contiguous to other
common open space area within the parcel being developed. Areas shall be considered
contiguous if they are within one hundred (100) ft of each other and there are no impediments
to access between areas.
Town of North Yarmouth Land Use Ordinance
Page 232 of 292
4. No area of common open space shall be less than fifty (50) ft in its smallest dimension and less
than ten thousand (10,000) sq ft in total, unless the proposed open space is sufficient to satisfy
the requirements of this Section 10.23. Open space not meeting this standard may be permitted
but must be for enhancement of the project and will not be counted toward the required common
open space requirements.
5. The boundaries of any parcel of open space shall be marked by natural features wherever
possible, such as hedgerows, stone walls, edges of woodlands, streams, or individual large
trees. Where no such existing demarcations are present, additional plantings, fences, or other
landscape features shall be added to enable residents or the public, if applicable, to distinguish
where the open space ends and private lot areas begin. Where structural demarcations, such
as fences are used, they shall be limited to the extend necessary to accomplish this objective.
Guidelines for the Percentage of Total Parcel to be
Reserved for Common Open Space and Recreation Land
Type of Development
Average Size of Lots
Percentage of Total Parcel
to be Reserved
Single Family Lots
80,000 square feet or greater
1.6%
40,000 square feet
3.3%
20,000 square feet
6.5%
15,000 square feet
8.7%
10,000 square feet
13.0%
C. Waivers for Minor Subdivisions: The Planning Board may waive this requirement for minor
subdivisions if the Planning Board makes a written finding, supported by an explanation, that the
useable open space and/or recreation land is not necessary due to the location of the proposed
development near existing publicly accessible open space/recreation land; or where there are no
opportunities to contribute to a network of open space land, or inter-connected trails, walkways
and/or bicycle paths. The applicant must submit a written request for the waiver and provide the
evidence necessary for the Planning Board to make its written findings.
D. Ownership and Maintenance of Common Open Space and/or Recreation Land:
1. All common open space and/or recreation land, facilities and property shall be owned by:
a. The owners of the lots or dwelling units by means of a lot owners' association;
b. An association which has as its principal purpose the conservation or preservation of land
in essentially its natural condition; or
c. The town.
2. Further subdivision of the common open space and/or recreation land and its use for other than
non-commercial recreation, agriculture, forestry and/or conservation purposes, except for
easements for underground utilities and subsurface wastewater disposal systems, shall be
prohibited. Structures and buildings accessory to non-commercial recreational or conservation
uses may be erected on the common land. When open space is to be owned by an entity other
than the town, there shall be a conservation easement deeded to the town prohibiting future
development.
3. Monitoring Fee: The Planning Board may require a fee for the ongoing monitoring of the
management of the common open space and/or recreation land, in compliance with the
requirements of the approved plan.
Town of North Yarmouth Land Use Ordinance
Page 233 of 292
4. The following items must be submitted with the subdivision application:
a. A description of all common open space and any other lands and facilities proposed to be
owned by the Town, a conservation organization, or a homeowner's association, or that
will be permanently protected by conservation easements. This description shall include
a map indicating the approximate location of these lands and facilities.
b. A description of proposed ownership arrangements for the parcels identified in Section
10.23.D.1.
c. A description of the proposed conservation restrictions that will permanently protect these
parcels.
d. A description of proposed arrangements and the responsible party for the long-term
stewardship of the common open space including management objectives and techniques
for each parcel or area.
E. Homeowners Association Requirements:
1. If any of the open space, recreational or other facilities are to be reserved by the individual
residential unit owners as common open space or facilities, each unit owner shall own a
fractional interest in the common open space or facilities, and the developer shall be required
prior to final subdivision plan approval to incorporate a homeowners' association consisting of
the individual unit owners, which incorporation must comply with the following:
a.
Proposed covenants shall be placed in each deed from the developer to the individual unit
owner, which deed covenants shall require mandatory membership in the homeowners'
association, and shall set forth the unit owners' rights, interests, privileges and obligations
in the association and in the common open space and/or facilities, including homeowners
association's responsibility and obligation to maintain and/or monitor the common open
space and/or any facilities.
b. The homeowners' association shall develop a system to levy and collect annual charges
against any and all individual lot owners to defray any expenses connected with the
maintenance of common open space and/or facilities, and this system shall be described in
said deed covenant or by some other legal instrument made binding upon the individual unit
owner and running with the land.
c. The developer shall maintain control of the common open space and/or facilities, and shall
be responsible for its maintenance until seventy five percent (75%) of the residential dwelling
units/lots in the subdivision have been sold, at which time, the homeowners' association
shall be responsible for such maintenance, and this obligation shall be described in said
deed covenant or by some other legal instrument made binding upon the individual unit
owner and running with the land.
d. All such proposed deed covenants and other legal documents pertaining to the common
open space and/or facilities shall be reviewed by the Town Attorney, and, if approved by the
Planning Board, shall be recorded in the Cumberland County Registry of Deeds, and included
or referred to in the deed to each unit.
e. All legal documents required under this subsection must be submitted with the final
subdivision plan application.
Town of North Yarmouth Land Use Ordinance
Page 234 of 292
SECTION 10.24 WATER SUPPLY [AMENDED 6/17/24]
A. Public Water Supply: When a proposed development is to be served by a centrally managed water
system, the complete supply system, including fire hydrants (if necessary), shall be installed at the
expense of the developer.
1. The developer shall provide a written statement from the Yarmouth Water District that adequate
supply and pressure for both domestic and fire- fighting purposes can be provided without
placing an undue burden on the source, treatment facilities, or distribution system involved. The
developer shall be responsible for paying the costs of system improvements necessary to serve
the subdivision or development.
2. The complete design and construction of the system, including the materials, size and location
of mains, gate valves, hydrants, and service connections shall be reviewed and approved in
writing by the Yarmouth Water District and the North Yarmouth Fire Chief.
B. Required Connection to Public Water Supply: The Planning Board may require that any
development that is located within one thousand (1,000) feet of an existing or planned water line of
the Yarmouth Water District make provisions for connection to the public system. Any such
installation shall meet the specifications and be approved by the Yarmouth Water District prior to
installation. When public water supply service will not be available at the time of construction of the
development, the Planning Board may require a "capped system" to allow future connection when
service becomes available. Any such installation shall be approved by and meet the specifications
of the Yarmouth Water District prior to installation.
C. Individual Wells: Individual wells shall be sited and constructed to prevent infiltration of surface
water, and contamination from subsurface wastewater disposal systems and other sources of
potential contamination. Lot design shall permit placement of wells and subsurface wastewater
disposal areas in compliance with the Maine Subsurface Wastewater Disposal Laws. Due to the
increased chance of contamination from surface water, new dug wells shall be prohibited on lots of
smaller than one acre, unless evidence is presented by a certified hydrogeologist or similar expert
assuring that a dug well can be safely utilized on the lot. New dug wells shall not be constructed
within on hundred (100) feet of the traveled way of any public road if located downhill (where the
average gradient is in excess of three percent [3%]) from the public road, or within fifty (50) feet
of the traveled way of any public road if located uphill of the public road. This restriction shall
be included as a note on the plan and deed restriction to the effected lots. The location of wells and
subsurface wastewater disposal systems shall be shown on the Final Plan.
D. Fire Protection:
1. Fire hydrants connected to a public water supply system shall be located no further than five
hundred (500) feet from any building.
2. A minimum storage capacity of ten thousand (10,000) gallons shall be provided for a subdivision
not served by a public water supply. Additional storage of two thousand (2,000) gallons per lot
or principal building shall be provided. The Planning Board may require additional storage
capacity upon a recommendation from the Fire Chief. Where ponds are proposed for water
storage, the capacity of the pond shall be calculated based on the lowest water level less an
equivalent of three (3) feet of ice.
3. Hydrants or other provisions for drafting water shall be provided to the specifications of the
North Yarmouth Fire Department. Minimum pipe size connecting dry hydrants to ponds or
storage vaults shall be six inches.
4. Where the dry hydrant or other water source is not within the right-of-way of a proposed or
Town of North Yarmouth Land Use Ordinance
Page 235 of 292
existing street, an easement to the town shall be provided to allow access. A suitable access
way to the hydrant or other water source shall be constructed.
SECTION 10.25 WATER QUALITY [AMENDED 6/19/21]
A. Water Quality: No development activity shall deposit on or into the ground or discharge to the waters
of the state any pollutant that, by itself or in combination with other activities or substances, will
impair designated uses, including existing and potential groundwater supplies, or the water
classification of the water body.
1. All storage facilities for fuel, chemicals, chemical or industrial wastes, and biodegradable raw
materials, must meet the standards of the Maine Department of Environmental Protection and
the Maine Fire Marshall's Office.
2. Developments shall not discharge wastewater to a water body without a license from the Maine
Department of Environmental Protection.
3. Discharges of storm water shall be treated to remove oil, grease, and sediment prior to
discharge into surface waters.
B. Groundwater: Land use activities must not adversely impact either the quality or quantity of
groundwater available to abutting properties or to public water supply systems. Applicants whose
projects involve on-site water supply or sewage disposal systems with a capacity of two thousand
(2,000) gallons per day or greater must demonstrate that the groundwater at the property line will
comply, following development, with the standards for safe drinking water as established by the
State of Maine. Ground water withdrawals by proposed land use activities shall not lower the water
table beyond the boundaries of the development in a way that would impair or significantly diminish
the permissible use of groundwater on land outside the development.
C. Requirements for Hydrogeologic Assessments: When a hydrogeologic assessment is required,
the assessment shall contain at least the following information:
1. A map showing the basic soils types to a Class A (high intensity) Soil Survey
2. The depth to the water table at representative points throughout the development
3. Drainage conditions throughout the development
4. Data on the existing groundwater quality, either from test wells in the development or from
existing wells on neighboring properties
5. An analysis and evaluation of the effect of the development on groundwater resources. In the
case of residential developments, the evaluation shall, at a minimum, include a projection of post
development nitrate-nitrogen concentrations at any wells within the development, or at the
development boundaries; or at a distance of one thousand (1,000) feet from potential
contamination sources, whichever is a shortest distance
6. A map showing the location of any subsurface wastewater disposal systems and drinking water
wells within the development and within two hundred (200) feet of the development boundaries
D. Projections of groundwater quality shall be based on the assumption of drought conditions
(assuming sixty percent (60%) of annual average precipitation).
Town of North Yarmouth Land Use Ordinance
Page 236 of 292
E. Subdivision Standards:
a. No development shall increase any contaminant concentration in the groundwater to more than
one half of the Primary Drinking Water Standards. No subdivision or development shall increase
any contaminant concentration in the ground water to more than the Secondary Drinking Water
Standards.
b. If groundwater contains contaminants in excess of the primary standards, and the subdivision is
to be served by on-site ground water supplies, the applicant shall demonstrate how water quality
will be improved or treated.
c. If groundwater contains contaminants in excess of the secondary standards, the subdivision shall
not cause the concentration of the parameters in question to rise above the ambient concentration.
d. Subsurface wastewater disposal systems and drinking water wells shall be constructed as shown
on the map submitted with the assessment. If construction standards for drinking water wells or
other measures to reduce groundwater contamination and protect drinking water supplies are
recommended in the assessment, those standards shall be included as a note on the final plan,
and as restrictions in the deeds to the affected lots.
e. The locations of approved subsurface wastewater disposal systems and drinking water well zones
shall be shown on the final plan.
SECTION 10.26 PROTECTION OF SIGNIFICANT WILDLIFE HABITAT [AMENDED 6/19/21]
A. Developments shall be designed to protect and conserve important wildlife habitat to the greatest
extent feasible. Significant wildlife habitats include, but are not be limited to, areas identified and
mapped in the Comprehensive Plan and the Beginning with Habitat Program, and by the Maine
Department of Inland Fisheries and Wildlife, including habitats for endangered or threatened
species, waterfowl and wading bird habitat, shorebird habitat, deer wintering areas, stream and
brook wildlife corridors, and other important wildlife habitats. Other significant wildlife habitats may
be identified through on-site field investigation.
B. Applicants shall utilize maps and information from the aforementioned sources to identify and map
wildlife habitats within proposed subdivisions and developments. These areas shall be shown on
development plans. Proposed developments shall be designed to avoid and/or mitigate adverse
impacts to wildlife and identified wildlife habitats.
C. Since wildlife management must take into account many site-specific variables, applicants proposing
to develop land within or adjacent to identified wildlife resources must consult with the Code
Enforcement Officer, Maine Department of Inland Fisheries and Wildlife or a wildlife biologist certified
by the Wildlife Society and approved by the Planning Board, and obtain a written report to submit
with the application. This report shall assess the potential impact of the development on the
significant habitat and shall describe appropriate mitigation measures to ensure that the
subdivision/development will have no/minimal adverse impacts on the habitat and the species the
habitat supports.
D. Deer Wintering Areas: The Planning Board may require a management plan for high and
moderate value deer wintering areas prepared by a wildlife biologist, who has been selected or
approved by the Planning Board.
E. The Planning Board may require deed restrictions and notes on the final plan to reflect any
requirements for wildlife protection and or mitigation.
Town of North Yarmouth Land Use Ordinance
Page 237 of 292
SECTION 10.27 PUBLIC ACCESS TO THE SHORELINE
Any existing public rights of access to the shoreline of a water body shall be maintained by means of
easements or rights-of-way or should be included in the open space with provisions made for continued
public access. For the purposes of this section "water body" shall include the Royal River, Chandler Brook,
the East Branch, Knight's Pond, the Deer Brook wetland, and those sections of Toddy Brook, Deer Brook,
Pratt's Brook and an unnamed tributary to Chandler Brook that are zoned as Resource Protection District.
SECTION 10.28 BACK LOTS AND ACCESS [AMENDED 6/19/21; 6/17/24]
A. Back lots shall be prohibited in subdivisions after the adoption of this Ordinance (June 14, 2005).
B. For Back Lot standards that are not part of a subdivision, see Section 8.3 for standards relating
to Back Lots and Street Access Requirements for Back Lots.
SECTION 10.29 ACCESS MANAGEMENT STANDARDS [AMENDED 6/19/21]
A. Applicability: The following access management standards are applicable to all lots and all public
roads located within North Yarmouth, unless stated otherwise. Any driveway or proposed street
must be designed so as to provide the minimum sight distance according to the Maine Department
of Transportation standards, to the maximum extent possible.
B. Adequacy of the Public Road System: Vehicular access to the site must be on public and private
roads that have adequate capacity to accommodate the additional traffic generated by the
development. The Planning Board may require mitigation when the proposed development is
anticipated to result in a decline in the existing level of service. Any project that generates one
hundred (100) or more passenger car equivalent trips during peak hour of traffic generation, must
obtain a Traffic Movement Permit from the Maine Department of Transportation pursuant to Title 23
M.R.S. Section 704-A.
C. Safe Sight Distances:
1. Access shall be designed in profile and grading and located to achieve the required sight
distance measured in each direction along the public road while maintaining adequate distances
from adjacent driveways and intersections.
2. Measurements: for purposes of the sight distance standards, the following provisions shall apply:
a. The sight distance shall be based on the posted speed limit
b. Sight distance is measured to and from the point on the centerline of the proposed access
that is located ten (10) feet from the edge of traveled way. The height of the hypothetical
person's view is considered to be three and a half (3½) feet above the pavement and the
height of the object being viewed is considered to be four and a quarter (4¼) foot above the
pavement.
c. Where truck traffic from the development onto the public road is expected to be significant
(e.g., industrial parks, warehousing operations, etc.) increase sight distance by 50 percent.
Height of eye should be six (6) feet with height of object no more than four and a quarter
(4¼) feet.
d. Where recreational vehicle traffic from the development onto the public road is expected to
be significant (as from a campground) increase sight distance by twenty-five percent (25%).
Height of eye should be at three and a half (3½) feet with height of object no more than four
Town of North Yarmouth Land Use Ordinance
Page 238 of 292
and a quarter (4¼) feet.
3. Driveway and intersection road placement shall be such that an exiting vehicle has an
unobstructed sight distance according to the following schedule:
Highway Speed (MPH)
Minimum Sight Distance (Feet)
20
155
25
200
30
250
35
305
40
360
45
425
50
495
55
570
60
645
4. A "site triangle" shall be maintained twenty-five (25) feet in length on each side of the intersection
of the driveway and the public street or road right-of-way line, with the third side connecting the
other two sides. Within each sight triangle, no landscape plants, trees, other than low growing
shrubs shall be planted. These shrubs must be no more than thirty (30) inches in height above
the driveway elevation.
D. Access Management and Safety Standards: Driveway and private-right-of-way access points
shall be limited as follows:
1. Points of access and egress must be located to avoid hazardous conflicts with existing turning
movements and traffic flows.
2. Residential Lots shall be as follows:
a. Limited to one access point per residential lot, or one access point for every two hundred
(200) feet in the Farm and Forest District, Residential Shoreland District and Resource
Protection District, whichever is less.
b. Limited to one access point per residential lot, or one access point for every one
hundred fifty (150) feet in the Village Center District and Village Residential District,
whichever is less.
3. Commercial and Other Non-Residential Lots shall be as follows:
a. Limited to two access points per lot, or one access point every two hundred (200) feet in the
Farm and Forest District, Residential Shoreland District and Resource Protection District,
whichever is less.
b. Limited to two access points per lot, or one access point for every one hundred fifty (150) feet
in the Village Center District and Village Residential District, whichever is less.
Town of North Yarmouth Land Use Ordinance
Page 239 of 292
4. Shared Driveways: Shared driveways shall be encouraged for adjacent sites, in order to
minimize the number of driveways along public roads. The Planning Board may allow for a
reduction in the minimum street frontage requirement by ten (10) percent when the applicant
agrees to provide a common driveway/right-of-way for multiple lots and/or uses.
5. Road, Pedestrian and Bicycle Connections Between Developments: For all projects,
provisions for vehicular circulation connections to future projects on adjacent properties shall
be encouraged wherever feasible and to the maximum extent possible. Pedestrian and bicycle
connections may also be required in accordance with Section 10.33. Pedestrian Ways and
Bicycle Access, Circulation and Facilities. Where appropriate and feasible, shared circulation
roads for major non-residential projects shall be located at least 100 feet from the main highway
in order to avoid intersection conflicts. This requirement may be waived in cases where
connectivity would result in the disruption of community character.
6. Subdivisions: Driveway access for individual lots within a subdivision shall be via an internal
subdivision street; driveways shall not have direct access to existing public roads. This
requirement may be waived when the Planning Board determines physical conditions particular
to the parcel justify granting a waiver. Access limitations shall be noted on the plan and in the
deed of each subdivision lot.
7. Corner Lot Access: Where a lot has frontage on two or more streets, the access to the lot shall
be provided to the lot across the frontage and to the street where there is lesser potential for
traffic congestion and for hazards to traffic and pedestrians. This requirement may be waived
where the applicant demonstrates that existing site conditions preclude the location of the
driveway to the street where there is lesser potential for traffic congestion and for hazards to traffic
and pedestrians, or that the location of the driveway to the street where there is lesser potential
for traffic congestion and for hazards to traffic and pedestrians would negatively impact a
predominately residential neighborhood.
8. Access Ways to Non-Residential Developments shall be designed to avoid queuing of
entering vehicles on any public road. Left lane storage capacity shall be provided to meet
anticipated demand. The Planning Board may require a traffic assessment to determine if a
turning lane is necessary.
9. Driveway Turn-Around Area: After the effective date of this Ordinance (June 14, 2005), all
future driveways shall be designed with sufficient vehicle turn-around area to enable a driver to
exit the premises without backing into the public road. The requirements shall be deemed to be
met by an on-site parking lot with a parking aisle, or by a service or frontage road, or by the use
of an on-site driveway turn-around for a single vehicle measuring at least eight (8) feet wide by
fifteen (15) feet long.
10. Driveway Grades: The grade of any proposed driveway should not be more than plus three
(±3) percent for a minimum of forty (40) feet from an intersection.
11. Access Way Location and Spacing: Access ways must meet the following requirements:
a. New public and private entrances/exits must be located at least fifty (50) feet from the closest
unsignalized intersection and one hundred fifty (150) feet from the closest signalized
intersection, as measured from the point of tangency for the corner to the point of tangency
for the access way. This requirement may be reduced if the shape of the site does not allow
conformance with this standard and the applicant demonstrates a hardship as required in
11.c. below.
b. New public and private entrances/exits must be located at least fifty (50) feet from existing
Town of North Yarmouth Land Use Ordinance
Page 240 of 292
private roads, as measured from the point of tangency for the corner to the point of tangency
for the access way. This requirement may be reduced if the shape of the site does not allow
conformance with this standard and the applicant demonstrates a hardship as required
in 11.c. below.
c. Demonstration of No Alternative: The Planning Board may approve a reduction in the
access way location and spacing requirements in 11.a. and/or 11.b when the applicant
demonstrates that the shape of the lot and the location of existing roads does not allow
conformance with the standards, and that there is no other alternative other than a reduction
in the access way location and spacing requirements. The applicant must submit a site plan,
done to scale, that demonstrates that all alternatives for meeting these requirements have
been explored and that without a reduction in the location and spacing, the development or
subdivision would not be possible.
SECTION 10.30 SUBDIVISION STREET CONNECTIVITY REQUIRED IN THE VILLAGE CENTER AND
VILLAGE RESIDENTIAL DISTRICTS [AMENDED 6/19/21]
A. Purpose: The purpose of this section is to support the creation of a connected transportation network within
the Village Residential District and the Village Center District to provide choices for drivers, bicyclists and
pedestrians; to promote walking and bicycling; to connect neighborhoods to each other and to local
destinations such as schools, parks and commercial areas; to reduce vehicles miles of travel and travel
times; to reduce emergency response times; to increase the effectiveness of town service delivery; and to
free up state road capacity to better serve regional long distance travel needs.
B. Applicability: These standards are applicable to all subdivisions proposed for the Village Center District
and the Village Residential District.
C. Requirements:
1. All proposed subdivision streets shall be designed as public through roads, and shall provide
connection to the nearest public through road. see Table 2
2. The proposed street system shall be designed to provide vehicular connections to all similar or
compatible adjacent uses (existing and future). Such connections shall be provided during the
initial phase of the project approximately every one thousand (1,000) feet for each direction
(north, south, east, west) in which the subject property will be required to provide a connection,
if it is determined by the Planning Board that the connection in that direction can best be
accomplished through the subject property. When the Planning Board deems a vehicular
connection impractical, it can increase the length requirement and/or require pedestrian
connections.
3. All streets, pedestrian and bicycle paths and access ways in the development's proposed
transportation system shall continue through to the boundary lines under the same ownership
as the subdivision.
4. Redevelopment and road improvement projects shall take advantage of opportunities for
retrofitting existing roads or rights-of-way to provide increased vehicular, pedestrian and bicycle
connectivity.
5. If connection to an existing public road is not possible at the time of the subdivision, a temporary
dead end road shall end in a cal du sac as described in Section 8.4 (most current version). A
right-of-way shall be extended from the hammerhead turn-around to the neighboring property
line for future extension. The right-of-way shall be dedicated to the town. This shall be labeled
"Future Street Extension" on all plans of the project and noted in all deeds.
Town of North Yarmouth Land Use Ordinance
Page 241 of 292
6. Reserved streets for future street connections to adjoining undeveloped property shall be
required by the Planning Board to be dedicated to the town. The developer of the adjoining
property can be required by the Planning Board to connect to and build over the reserved strips.
Reserved strips not to be used shall be dispensed with according to 23 M.R.S. Section 3027.
7. Waivers: The Planning Board may waive the requirement for connectivity when existing natural
features and natural resources are located in such a fashion as to prevent connections to an
existing or future public street, and/or when the only connection available is with an incompatible
adjacent use, such as a gravel pit or an industrial use. When the Planning Board waives the
requirements for connectivity, the following standards shall apply:
a. No dead end street or portion of a street shall exceed five hundred (500) feet in distance from
a public through street to the center of the turn-around. The aforementioned public through
street may include a portion of the proposed subdivision street that has been accepted by
the Select Board as a Town Road.
b. All dead end streets shall end in a hammerhead turn-around designed in accordance
with Section VIII Section 8.4 Design and Construction Standards for Roads and Driveways
and the town's Roadway Ordinance.
c. No driveways may be built off of any turn-around.
d. Provisions shall be made to assure adequate emergency access to all lots.
SECTION 10.31 SUBDIVISION STREET LENGTH AND CONNECTION REQUIREMENTS IN THE
FARM AND FOREST DISTRICT AND RESIDENTIAL SHORELAND DISTRICT [AMENDED 6/19/21]
A. Purpose: The purpose of these requirements is to assure adequate emergency access to residences within
rural subdivisions, and to promote connectivity of the town's street system.
B. Standards:
1. No more than twelve (12) residential units or lots shall be constructed or created on a dead end
street unless there is an emergency second access street to a public through road. Emergency
second access streets shall be on rights-of-way that are at least fifty (50) feet wide. The
emergency second access street shall have a traveled way of at least eighteen (18) feet wide.
The Planning Board may allow a narrower traveled way width to mitigate environmental impacts,
such as impacts on wetlands, but may not reduce the required traveled way width to less than
twelve (12) feet. The emergency second access street must be adequate to allow for snow
plowing and emergency access by fire trucks. Gravel may be used as a road surface. The
emergency second access street shall be suitable for year-round use, and shall meet or exceed
the applicable construction standards (materials and depths) for rural streets in the Section VIII
Section 8.4 Design and Construction Standards for Roads and Driveways. Emergency second
access streets shall be plowed and maintained year-round by a Homeowner's Association or
the developer.
2. In no case shall a dead-end street with only one point of access to a public through road exceed
two thousand (2,000) feet in linear length including the hammerhead portion of the road. Loop
portions of dead end streets shall not be included for purposes of computing the linear length of
the dead end street.
3. Connectivity Requirements: The design of subdivision streets shall provide for the
continuation of streets to and from adjacent subdivisions and/or undeveloped land, where the
Planning Board determines that interconnection of streets is physically feasible and would
Town of North Yarmouth Land Use Ordinance
Page 242 of 292
contribute to the safety and function on the street system. If connection to an existing street is
not possible at the time of the subdivision, a temporary dead end street shall end in a
hammerhead turn-around designed in accordance with the, Section VIII 8.4 Design and
Constructions Standards for Roads and Driveways and the town's Roadway Ordinance. A right-
of-way shall be extended from the hammerhead turn-around to the neighboring property line for
future extension. The right-of-way shall be dedicated to the town. This shall be labeled "Future
Street Extension" on all plans of the project and noted in all deeds. Reserved street for future
street connection to adjoining undeveloped property shall be dedicated to the town. The
developer of the adjoining property can be required by the Planning Board to connect to and
build over the reserved strips. Reserved strips not to be used shall be dispensed with according
to 23 M.R.S. Section 3027.
SECTION 10.32 PEDESTRIAN WAYS AND BICYCLE ACCESS, CIRCULATION AND FACILITIES
[AMENDED 6/19/21]
A. Applicability and Purpose: The provisions of this section are applicable to all subdivisions and
developments. The purpose of these requirements is to provide networks of well-designed,
connected pedestrian ways (sidewalks, path, trails) and bicycle ways that link the project with
residential, recreational, and commercial facilities, schools, bus stops, and existing sidewalks in the
neighborhoods or, when appropriate, to connect with amenities such as parks or open space on or
adjacent to the site. Bicycles will be expected to share the road with automobiles in subdivisions and
developments where traffic speeds are low. However, separate bicycle lanes are needed along
Routes 115, 231, 9 and North Road. Other facilities, such as bicycle parking facilities, school bus
stops, and park benches are also envisioned.
B. Standards:
1. Village Center District and Village Residential District: Sidewalks shall be provided on at
least one side of the road in subdivisions and residential developments within the Village Center
District and the Village Residential District. The Planning Board may waive this requirement for
residential developments with less than 10 units/lots located on terminally; dead end roads where
the applicant has demonstrated that future connection to other walkways (sidewalks, paths,
trails) would not be possible.
2. Farm and Forest District and Residential Shoreland District, Resource Protection
District: The Planning Board may require sidewalks, including paths and trails in major
subdivisions with ten (10) or more lots or residential units, if the Planning Board makes a written
finding that includes an explanation of the need. In determining the need for sidewalks, paths
or trails, the Planning Board shall consider the location and density of the development and the
need to connect with existing or future adjacent pedestrian ways, including sidewalks, trail
systems and public land, and the need to provide safe walkways within the development.
3. Sidewalks shall be designed in accordance with the requirements of the Town of North
Yarmouth Street Design and Construction Standards Section VIII (most current version as of
the date of a complete application).
4. Where sidewalks, paths or trails exist adjacent to a proposed subdivision or development, the
new sidewalks, paths or trails shall be installed to connect to existing sidewalks, paths or trails.
In areas where sidewalks, paths or trails do not currently exist, but where they are anticipated,
area shall be reserved for the development of future sidewalks, paths and trails.
5. Site Plan: The site plan must provide for a system of pedestrian ways within the development
appropriate to the type and scale of development. This system must connect the major building
entrances/exits with parking areas and with existing sidewalks, if they exist or are planned in
the vicinity of the project. The pedestrian network may be located either in the street right-of-
Town of North Yarmouth Land Use Ordinance
Page 243 of 292
way or outside of the right-of-way in open space or recreation areas. The system must be
designed to link the project with residential, recreational, and commercial facilities, schools, bus
stops, and existing sidewalks in the neighborhood or, when appropriate, to connect with
amenities such as parks or open space on or adjacent to the site.
6. Parking Plans: All parking plans shall include a bicycle and pedestrian circulation plan. The
plan shall show the locations where bicycles and pedestrians are likely to travel both into the
site and within it. The parking plan shall be designed to provide safe pedestrian and bicycle
access, and shall propose improvements necessary to link pedestrian and bicyclists from
identified points outside of the development.
a. The parking plan shall delineate bicycle-parking facilities for commercial, recreational, and
institutional developments. Such facilities shall be located as close as possible to the principal
building(s). The provision of bicycle parking may be used to offset the number of automobile
spaces required.
b. Pedestrian ways shall be provided within and between parking areas and between buildings,
streets, roads, and other parking areas.
c. In the Village Center District and the Village Residential District, all applications with parking
plans containing ten (10) or more new parking spaces shall provide sidewalks on portions
of their frontage that abut a public road.
SECTION 10.33 INTERNAL VEHICULAR CIRCULATION [AMENDED 6/19/21]
A. The layout of the site must provide for the safe movement of passenger, service, and emergency
vehicles through the site.
1. Nonresidential projects that will be served by delivery vehicles must provide a clear route for
such vehicles with appropriate geometric design to allow turning and backing for the largest
delivery vehicles anticipated.
2. Clear routes of access must be provided and maintained for emergency vehicles to and around
buildings and must be posted with appropriate signage (fire lane - no parking).
3. The layout and design of parking areas must provide for safe and convenient circulation of
vehicles throughout the lot with consideration for pedestrian movement.
4. All roadways must be designed to harmonize with the topographic and natural features of the
site insofar as practical by minimizing filling, grading, excavation, or other similar activities
which result in unstable soil conditions and soil erosion, by fitting the development to the natural
contour of the land and avoiding substantial areas of excessive grade and tree removal, and by
retaining existing vegetation during construction. The road network must provide for vehicular,
pedestrian, and cyclist safety, all season emergency access, snow storage, and delivery and
collection services.
SECTION 10.34 OFF STREET PARKING [AMENDED 6/19/21; 6/17/24]
A. Applicability: Off street parking shall be provided for all new construction, expansions, and
changes of use in accordance with the requirements and standards in this section. Off street
parking, in addition to being a permitted use, shall be considered as an accessory use when required
or provided to serve conforming uses located in any district. This section does not apply to single
family residential units.
B. General Requirements: Proposals subject to development review shall be accompanied by plans
Town of North Yarmouth Land Use Ordinance
Page 244 of 292
and information making provision for off-street parking. Such plans shall attempt to balance the
provision of adequate parking for the project under review while minimizing the development of
visible paved areas. Parking areas must be constructed to protect the natural environment and
visual character of the community, improve pedestrian safety and accessibility, and promote the
quality of life in developed areas.
C. Parking Layout and Design: Off-street parking must conform to the following standards:
1. Parking shall be provided on the lot occupied by the use for which the parking is required, or on
an adjacent lot owned or controlled by such use.
2. Parking areas with more than two (2) parking spaces must be arranged so that it is not
necessary for vehicles to back into the public road. In no instance shall off-street parking be
designed so that vehicles back out into Routes 115, 9, 231 or North Road.
3. Off-street parking shall be located behind or to the side of the principal building and shall be
landscaped. All parking spaces, access drives, and impervious surfaces must be located at
least five (5) feet from any side or rear lot line, except where standards for buffer yards require
a greater distance or where two adjacent lots share a parking lot.
4. All plans for parking areas shall include a landscaping plan which adequately screens parking
lots, and that provides interruptions of parking spaces.
5. The joint use of a parking area by two or more principal buildings or uses may be approved
where it is clearly demonstrated that the parking area would meet the intent of this section in the
probable time of maximum use by patrons and employees. In approving shared parking, the
permitting authority shall require cross-easements or other legally enforceable documents for
shared parking which permanently ensure the shared parking arrangement.
6. Parking areas shall be constructed with a suitably durable surface that minimizes dust and is
appropriate for the use of the land, with adequate drainage. Surfacing, grading and drainage
shall facilitate groundwater recharge by minimizing impermeable pavement and run-off. Oil traps
may be required for larger paved parking lots. Parking areas to be used at night shall be lighted
in a manner that does not result in direct lighting to or glare to abutting residential properties or
cause a traffic hazard due to glare.
7. All individual parking spaces shall be nine (9) feet by eighteen (18) feet. The provision for oversized
parking spaces shall be permitted for activities that normally serve oversize vehicles, such as
recreation vehicles and trucks. Aisles shall be a minimum of twenty-four (24) feet for two-way
traffic, and fourteen (14) feet for one- way traffic.
Town of North Yarmouth Land Use Ordinance
Page 245 of 292
Parking Guidelines
USE
Parking Spaces Required (Minimum)
Residential: Single Family, Duplex
2 per dwelling unit
Multiple Residential Units in a permitted Building
Type
1.0 spaces per dwelling unit
Home Business
2 spaces in addition to required parking for
residence (may be reduced by Board of Appeals)
Municipal Use
1.25 spaces per employee plus 1 space per 150
square feet of floor area for public assembly &
meeting room space
Institutional and/or Places of Public Assembly,
such as Theaters, Auditoriums, Churches,
Synagogues, Gymnasiums, Stadiums, Sports
Arenas
1 space per 4 seats plus 1 space per 2
employees
Day Care Center and Nursery School
1 per employee/volunteer worker plus a safe area
for
vehicle
pick-up
and
drop-off
of
students/children
Schools
Grades K-8: 1 space per classroom plus 1 space
for each employee plus parking in accordance with
the places of public assembly
Secondary: 8 spaces per classroom plus parking
in accordance with the places of public assembly
Commercial Retail Sales
3 spaces per 1,000 square feet plus 1 space per
employee
Gas and/or Service Station; Auto Repair Garage
.25 space per fuel pump plus 1 space per
employee plus 4 spaces per service bay
Banks
4 spaces per 1,000 square feet of floor area
Personal Services, Business Services, Business
and Professional Offices (non-medical)
3 spaces per use or 4 spaces per 1,000 square
feet of floor area (or 1 space per 250 square feet
of floor area or portions thereof), whichever is
greater
Restaurants/Eating Places
1 space per 4 patrons at capacity plus 1 space
per employee
Commercial Accommodations
1 space per guest room plus 1 space per
employee
Bed and Breakfast Inn
2 spaces plus 1 space per guest bedroom
Veterinary Clinics
4 spaces per doctor plus 1 space per other
employee
Light Industrial
1 space for each 1.2 employees, based on the
highest expected average employee occupancy
Funeral Homes
1 space for each 75 square feet of floor in
slumber rooms, parlors and individual services
rooms
Other Uses
As determined by the Planning Board based
upon the latest edition of the Institute of
Transportation Engineers Parking Generation
Manual or data of actual parking demands of
similar uses
Notes:
1.
The minimum number of spaces shall be rounded up to the nearest whole number.
2.
The maximum number of employees scheduled during peak demand/shift overlap shall be used in calculating the number
of required parking spaces when employee is referenced in this table.
See definition of "floor area" in Section XII. Definitions.
Town of North Yarmouth Land Use Ordinance
Page 246 of 292
8. In lots utilizing diagonal parking, the direction of proper traffic flow must be indicated by signs,
pavement markings or other permanent indications and maintained as necessary.
D. Parking Space Requirements: The number and layout of parking spaces shall be based on the
need to protect the public safety and convenience while minimizing harm to the character of the
community and to environmental, historic and scenic resources. Since land use activities can vary
widely in their need for off-street parking, it is appropriate to establish parking requirements based
on the specific operational characteristics of the proposed uses. The parking guidelines in the
following table shall be applied according to the following criteria. In applying or modifying the
parking guidelines for any proposed use, the reviewing authority shall consider the following:
1. Parking spaces shall be sufficient to accommodate the use during a typical week.
2. The size of the structure(s) and the site.
3. The environmental, scenic, or historic sensitivity of the site. In cases where sufficient area for
parking cannot be created on the site without disturbance to these resource values, the
reviewing authority may require a reduction in the size of the structure so that the available
parking will be sufficient.
4. The availability of on-street parking.
5. Availability of off-site, off-street parking that is open to the public, owned or controlled by the
applicant, or available on a shared unit basis.
6. Consideration of pedestrian and bicycle safety.
7. Other standards used in generally accepted traffic engineering and planning manuals.
E. Waivers: The requirements of this subsection may be waived in situations where a primary structure
existed on the parcel as of June 14, 2005, and there is no other alternative for siting parking, or
where compliance would be impractical.
SECTION 10.35 OFF STREET LOADING REQUIREMENTS
A. Loading requirements vary with the specific uses proposed. Loading requirements shall be applied
to ensure that trucks load and unload cargo in a manner that does not interfere with pedestrian and
automobile movements on public roads. Requirements for the number and location of loading
facilities shall be established case-by-case based upon the following:
1. The expected maximum number of trucks using the loading facilities at times of peak usage.
2. The type of business, size of the structure, and size of trucks to be servicing the structure.
3. The location of the loading facility away from potential pedestrian, automobile and bicycle traffic
conflicts.
4. The need to screen trucks and loading facilities from publicly accessible areas as well as from
abutting properties, including the need for vegetative screening, buffers, and/or fencing.
5. The desirability of requiring service roads or alleys to achieve the purposes of this subsection.
Town of North Yarmouth Land Use Ordinance
Page 247 of 292
6. Other operational characteristics of the business or physical characteristics of the site deemed
appropriate by the reviewing entity or official.
7. The need to maintain the traditional layout and historic character of the town center, which may
preclude the establishment of modern loading facilities in some locations.
8. The loading facility shall be sited in a manner that minimizes noise impacts on other property.
Mitigation measures shall be employed to ensure that noise is minimized.
Town of North Yarmouth Land Use Ordinance
Page 248 of 292
XI.
STANDARDS FOR SPECIFIC ACTIVITIES
SECTION 11.1 ACCESSORY DWELLING APARTMENTS [AMENDED 5/17/08; 6/17/24]
A. Purpose: The purpose of this provision is to allow an affordable housing option that is in keeping
with the character of the community. This provision allows for the creation of a single, subordinate
accessory dwelling unit incidental to an existing or new single-family dwelling.
B. Standards and Requirements: One (1) accessory dwelling unit may be constructed on the same
lot as a single-family dwelling unit in any area in which housing is allowed, subject to the
requirements of the following criteria:
1. Private, state, or local standards such as homeowners' association regulations, deed
restrictions, setbacks, density, septic requirements, shoreland zoning and subdivision law may
also apply to lots.
2. An accessory dwelling unit may be constructed only:
a. Within an existing dwelling unit on a lot;
b. Attached to a single-family dwelling unit;
c. As a new structure on a lot for the primary purpose of creating an accessory dwelling unit;
or
d. Within an existing accessory structure.
3. Dimensional Requirements:
a. For an accessory dwelling unit located within a single-family dwelling unit or attached to a
single-family dwelling unit, the dimensional requirements and setback requirements of the
accessory dwelling unit must be the same as the dimensional requirements and setback
requirements of the single-family dwelling unit.
b. For an accessory dwelling unit permitted in an accessory structure existing as of July 1,
2023, the required setback requirements in this Ordinance of the existing accessory
structure apply.
c. An accessory dwelling unit is allowed on a lot that does not conform to this Ordinance if the
accessory dwelling unit does not further increase the nonconformity, excluding lot area.
4. Accessory dwelling units are exempt from any density or lot area requirements related to the
area in which the accessory dwelling unit is constructed.
5. The accessory dwelling unit is limited to one (1) bedroom.
6. Accessory Dwelling Units Size:
a. An accessory dwelling unit, whether constructed within, attached to, or detached from the
single-family dwelling, shall not exceed forty (40) percent of the available living area of the
principal single-family dwelling (excluding the basement of the single-family dwelling).
b. An accessory dwelling unit must be at least 190 square feet in size, unless the Technical
Building Code and Standards Board, pursuant to 10 M.R.S. § 9722, adopts a different
minimum standard; if so, that standard applies.
Town of North Yarmouth Land Use Ordinance
Page 249 of 292
7. The Code Enforcement Officer (CEO) approves the accessory dwelling unit. The CEO shall
require an owner of an accessory dwelling unit to provide writing verification that the proposed
accessory dwelling unit is to be connected to adequate water and wastewater services prior to
certification of the accessory dwelling unit for occupancy. Written verification must include the
following:
Water and Wastewater:
a. If an accessory dwelling unit is connected to a septic system, proof of adequate sewage
disposal for subsurface wastewater. The septic system must be verified as adequate by a
local plumbing inspector pursuant to 30-A M.R.S. §4221. Plans for a subsurface wastewater
disposal must be prepared by a licensed site evaluator in accordance with 10-144 C.M.R.
Chapter 241, Subsurface Wastewater Disposal Rules;
b. If an accessory dwelling unit is connected to a public, special district or other centrally
managed water system, proof of adequate service to support any additional flow created by
the unit, proof of payment for the connection and the volume and supply of water required
for the unit; and
c. If an accessory dwelling unit is connected to a well, proof of access to portable water,
including the standards outlined in 01-672 C.M.R. Chapter 10 section 10.25(J), Land Use
Districts and Standards. Any test of an existing well or proposed well must indicate that the
water supply is potable and acceptable for domestic use.
8. The owner of the property must occupy either the accessory dwelling unit or the principal
dwelling unit.
9. Accessory dwelling units shall be exempted from meeting the requirements of Section 3.3.E.
Residential Growth Limitation.
10. Accessory dwelling units are not subject to any additional vehicle parking requirements beyond
the parking requirements of the single-family dwelling unit on the lot where the accessory
dwelling unit is located.
SECTION 11.2 AFFORDABLE HOUSING [AMENDED 6/19/21; 6/17/24]
11.2.1 VILLAGE CENTER (VC) DISTRICT AFFORDABLE HOUSING DENSITY BONUS
A. Purpose:
The purpose of these provisions is to provide incentives for the development of affordable
housing consistent with 30-A M.R.S. §4364 as the Village Center (VC) District is the Town's
designated growth area pursuant to 30-A M.R.S. § 4349-A(1)(A).
B. Minimum Lot Size Requirements:
All lots must comply with 12 M.R.S. § 4807-A. Minimum lot size required.
C. Water and Wastewater Requirements:
The property owner must provide written verification that each unit of the housing development
is proposed to be connected to adequate water and wastewater services prior to certification of
the development for occupancy. Written verification must include the following:
1. If a public or special sewer district is constructed within the Village Center (VC) District, or if a
comparable sewer system is proposed, proof of adequate service to the support any additional
flow created by the unit and proof of payment for connection to the system.
Town of North Yarmouth Land Use Ordinance
Page 250 of 292
2. If a housing unit is connected to a septic system, proof of adequate sewage disposal for
subsurface wastewater. The septic system must be verified as adequate by a local plumbing
inspector pursuant to 30-A M.R.S. § 4221. Plans for a subsurface wastewater disposal must be
prepared by a licensed site evaluator in accordance with 10-144 C.M.R. Chapter 241,
Subsurface Wastewater Disposal Rules.
3. If a housing unit is connected to a public, special district or other centrally managed water
system, proof of adequate service to support any additional flow created by the unit, proof of
payment for the connection and the volume and supply of water required for the unit.
4. If a housing unit is connected to a well, proof of access to potable water, including the standards
outlined in 01-672 C.M.R. Chapter. 10 section 10.25(J), Land Use Districts and Standards. Any
test of an existing well or proposed well must indicate that the water supply is potable and
acceptable for domestic use.
D. Long-Term Affordability:
In order to receive a certificate of occupancy or other final approval of an affordable housing
dwelling unit, the owner of the affordable housing development must (1) execute a restrictive
covenant that is enforceable by a party acceptable to the Town; and (2) record the restrictive
covenant in the Cumberland County Registry of Deeds to ensure that for at least thirty (30)
years after completion of construction.
1. For rental housing, occupancy of all the units designated affordable in the development will
remain limited to households at or below 80% of the area median income, as defined by the
U.S. Department of Housing and Urban Development (HUD), at the time of initial occupancy;
and
2. For owned housing, occupancy of all the units designated affordable in the development will
remain limited to households at or below 120% of the area median income, as defined by the
U.S. Department of Housing and Urban Development (HUD, at the time of initial occupancy.
E. Density Bonus:
1. To receive the density bonus and be considered an affordable housing development, as defined
in Section 12, a majority of the total units on the lot must be designated as affordable.
2. The affordable housing development shall be allowed a dwelling unit density of at least 2.5 times
the base density that is otherwise allowed in that location or by building type; and
3. No more than two (2) off-street motor vehicle parking spaces for every three (3) dwelling units
shall be required for an affordable housing development.
4. If fractional results occur when calculating the density bonus or parking requirement in this
subsection, the number of units or parking spaces is rounded down to the nearest whole
number.
F. Residential Growth Limitation Waiver: The Planning Board shall waive the requirements of
Section 3-3.E. Residential Growth Limitation, for the affordable housing development, if the
developer can assure to the Planning Board's satisfaction that a majority of the total units meet the
criteria set forth in 30-A MRS 4364 such that developments will be designated as an affordable
housing development, Village Center District, as defined in Section XII, and remain affordable for
the next thirty (30) years.
Town of North Yarmouth Land Use Ordinance
Page 251 of 292
11.2.2 - AFFORDABLE HOUSING BONUS FOR DISTRICTS OUTSIDE THE VILLAGE CENTER
A. Purpose:
1. The purpose of these provisions is to provide incentives for the development of affordable
housing outside the Village Center (VC) District, with the following priorities:
a. To provide an adequate supply of affordable housing to meet the needs of senior citizens,
municipal and school employees, and others with modest incomes.
b. To encourage lifetime residency - to facilitate townspeople remaining in the town after their
children have grown up and during retirement years by providing affordable senior housing
that is compatible with "senior living lifestyles".
c. To encourage the development of affordable housing consistent with the existing character
of the town.
2. These provisions are intended to provide the Planning Board with flexibility to waive
requirements that impede development of qualified affordable housing, provided that the
Planning Board, in its discretion, determines that the proposed affordable housing meets the
purposes of this Section to the maximum extent feasible.
B. Applicability: These provisions shall apply to any affordable housing as defined in Section XII.
Definitions and outside of the Village Center (VC) District. Affordable housing pursuant to these
provisions must be approved by the Planning Board through Site Plan Review or Subdivision Review.
C. Standards and Requirements:
1. Affordable housing units shall be geographically dispersed throughout the development where
feasible, and the dwelling units shall be compatible with the design of the remainder of the
development in terms of appearance.
2. An affordable housing unit shall not have more than fifteen hundred (1,500) square feet of living
space. The Planning Board shall require deed restrictions that prohibit future expansion of the
square footage of living space.
3. The affordable housing lots/units shall be constructed concurrently with the remainder of the
project.
4. Affordable housing may be developed as a clustered housing development pursuant to Section
11.3. Clustered Housing Developments. Affordable housing may be condominiums.
5. Net Residential Density Bonus: The Planning Board may grant a twenty percent (20%) net
residential density bonus for the development of affordable housing units, if the developer can
assure to the Planning Board's satisfaction that at least twenty percent (20%) of the total number
of residential dwelling units in the proposed development will remain affordable to low and/or
moderate income families for the next twenty-five (25) years, and that preference will be given
to individuals and families as described in A.1 above. The density bonus shall be calculated
such that when the percentage of lots or units is more than .5 the bonus number of lots/units
shall be rounded up, and when percentage of lots or units is .5 or less the bonus number of
lots/units shall be rounded down. For example, if 12 lots are proposed, two (2) of the lots must
be affordable housing units (12 times 20% = 2.4, rounded down to 2 lots) If thirteen (13) lots are
proposed, three (3) of the lots must be affordable housing units (13 times 20% = 2.6, rounded
up to 3 lots). The Planning Board shall not grant a net residential density bonus within the Royal
Town of North Yarmouth Land Use Ordinance
Page 252 of 292
River Corridor Overlay District, Residential Shoreland District or the Resource Protection
District. The Planning Board shall not grant a net residential density bonus for any
development located within the Groundwater Protection Overlay District, unless sewer
serves the development.
6. Residential Growth Limitation Waiver: The Planning Board shall waive the requirements of
Section 3-3.E. Residential Growth Limitation, for the affordable housing units, if the developer
can assure to the Planning Board's satisfaction that at least twenty percent (20%) of the total
number of residential dwelling units in the proposed development will remain affordable to low
and/or moderate income families for the next twenty-five (25) years, and that preference will be
given to individuals and families as described in A.1 and A.2 above.
7. Long-Term Affordability Required for All Affordable Housing: Long-term affordability must be
assured for a period no less than twenty-five (25) years through deed restrictions or some other
recorded instrument acceptable to the Town Attorney. The developer of affordable housing shall
include provisions for preserving affordability, which shall be reviewed by the town attorney prior
to Select Board and Planning Board review of the proposed long-term affordability agreement.
A third party that has the expertise and resources to undertake and continue the task of assuring
the long- term affordability of the housing may administer the affordability program. The following
standards shall be applied to affordable owner occupied and rental housing:
a. Owner Occupied Residences: When the affordable housing includes units to be sold as
residences, the developer shall use legal mechanisms such as, but not limited to, restrictive
covenants, ground leases, or "soft" mortgages to ensure that the residences are owner-
occupied and that the initial and subsequent sales prices are affordable to target groups for
a minimum of twenty-five (25) years. Preserving long-term affordability may mean
restrictions on resale to qualified buyers, if available, granting a right of first refusal to the
town, or the town's designee. Additional restrictions limiting the owner's ability to improve the
property and/or to recoup some part of the costs of the improvements at resale are also to
be considered.
b. Rental Units: When an affordable housing includes rental units, provisions shall be made
to ensure that the rental price of units remains affordable to the target groups for a minimum
of twenty five (25) years.
SECTION 11.3 CLUSTERED HOUSING DEVELOPMENT AND OPEN SPACE DEVELOPMENT [AMENDED
6/19/21]
A. Purpose:
1. The purposes of these provisions are as follows:
a. To conserve open land, including, but not limited to areas containing unique or
environmentally sensitive natural or cultural resources such as stream corridors, wetlands,
wildlife habitats, woodlands, existing and future water supplies, scenic areas and significant
archaeological sites, by setting them aside from development;
b. To implement the Comprehensive Plan, including the Open Space Plan, to create a Royal
River Corridor1 and other conservation networks for the benefit of present and future
residents;
c. To provide for the conservation and maintenance of open land for active or passive
recreational use;
Town of North Yarmouth Land Use Ordinance
Page 253 of 292
1 The Royal River Corridor includes the Royal River, Chandler Brook and the East Branch, and at least 500 feet on both sides of these water
bodies.
d. To provide greater design flexibility and efficiency in siting of services and infrastructure,
including reductions in the length of roads and utility runs, and the amount of paving required
for development;
e. To provide for a diversity of lot sizes, building densities and housing choices to
accommodate a variety of age and income groups, and residential preferences;
f.
To create neighborhoods with direct visual access to open land, with amenities in the form
of neighborhood open space, and with a strong neighborhood identity.
g. To conserve scenic views and elements of the town's rural character, and to minimize
perceived density, by minimizing views of new development from existing public roads.
2. To achieve these purposes, the Planning Board may approve clustered housing development
and open space development in accordance with the provisions of this section. In approving
any subdivision in any district, the Planning Board may approve clustered housing development
where lot sizes, lot widths, lot coverage, street frontages and building setbacks can be reduced
below the minimum requirements of Section VII. Zoning District Regulations, and any land
gained thereby is set aside as open space. Clustered housing development is optional in the
growth districts and mandatory in the rural districts2. In approving subdivisions, the Planning
Board may also approve open space development in the rural districts as an alternative to
clustered housing development. Open space development requires very low residential
densities and permanent preservation of designated high value open space.
B. Applicability: This section is applicable to the development of residential subdivisions, as follows:
1. Farm and Forest District, Residential Shoreland District and Resource Protection
District: Clustered Housing Development or Open Space Development and the provisions of
this section shall be mandatory for all residential subdivisions located within the Farm and
Forest District, the Residential Shoreland District and the Resource Protection District.
Waivers: The Planning Board may waive the mandatory Clustered Housing Development or
Open Space Development requirement under the following conditions:
a. For minor subdivisions of less than five (5) lots where the applicant demonstrates that there
will be minimal benefits in keeping with the purposes of Section 11.3, and where the
development does not provide an opportunity to enhance the Royal River Corridor, Pratt's
Brook, Toddy Brook or Deer Brook corridors, open space associated with Knight's Pond or
existing and future public water supplies.
b. For subdivisions within and/or adjacent to the Royal River Corridor, when a developer or
landowner demonstrates to the Planning Board the following:
1) The property was a lot of record3 at the time of the adoption (June 14, 2005) of this
provision (Section 11.3.B.1.b), and the developer was the owner of the property at the
time of the adoption of this provision;
1 Growth Districts include the Village Center District and Village Residential District.
2 Rural Districts include the Farm and Forest District, Residential Shoreland District and Resource Protection District.
3 Definition: "Lot of Record: At lot that exists as shown or described on a plat or deed in the records of the Cumberland County Registry of Deeds."
Town of North Yarmouth Land Use Ordinance
Page 254 of 292
2) The mandatory Clustered Housing Development or Open Space Development
requirement would result in a significant loss of otherwise buildable lots under the other
provisions of Section 11.3.B.1. A significant loss of otherwise buildable lots is defined as
the loss of more than 30 percent of the total number of buildable lots due to the prohibition
against new residences within subdivisions within the Royal River Corridor area between
two hundred (250) feet from the normal high water mark of the Royal River, Chandler
Brook or the East Branch and five hundred (500) feet from the high water mark of these
water bodies; and
3) The developer and/or landowner calculates the number of buildable lots lost as a result
of Section 11.3.B.1 and obtains subdivision approval for a plan that meets the other
criteria of this Ordinance and the Subdivision provisions prior to January 1, 2010.
4) Sunset Clause: Section 11.3.B.1.b will terminate on January 1, 2010.
c. In all cases, waivers shall only be granted in accordance with subsections B.1.a and B.1.b,
above. The Planning Board shall assure preservation of high value open space in keeping
with the goals of the Royal River Corridor Overlay District to the greatest extent practical. In
granting the waiver the Planning Board may allow smaller lot sizes and/or allow for limited
residential development within the area between two hundred (250) feet from the normal
high water mark of the Royal River, Chandler Brook or the East Branch and five hundred
(500) feet from the high water mark of these water bodies.
2. Village Center District and Village Residential District: The provisions of this section shall
be optional in the Village Center District and Village Residential District. Applicants shall be
encouraged to utilize cluster housing development when these designs can be shown to
increase housing affordability and/or enhance neighborhood cohesion, aesthetics, open space
and recreational amenities.
a. When a subdivision application/sketch plan does not propose clustered development, the
Planning Board may, in its discretion, ask the applicant to submit an alternative sketch plan
showing a clustered housing development.
b. If the Planning Board, after a site walk and after such consultation with appropriate agencies
or non-profits as the Planning Board deems appropriate, concludes that the parcel shown on
the alternative sketch plan contains open fields, pasture, wetlands, waterways, wildlife
habitat, scenic vistas, historic and/or archeological assets, rare flora or fauna or notable
stands of forest, any of which could be preserved by clustering, the Planning Board may
request that the applicant revise the application and propose a clustered housing
development.
c. A request under paragraph (b) above will not bind the applicant; but if the applicant decides
not to propose a clustered housing development, the Planning Board may consider the
absence of clustering when it determines if the application meets the review criteria of
Section V. Subdivision Review Procedures and Criteria.
C. General Standards for Clustered Housing Development and Open Space Development:
1. Developments proposed under the terms of this section shall meet all the requirements for a
subdivision, Section VIII Section 8.4 Design and Constructions Standards for Roads and
Driveways, and all other applicable town ordinances including the general performance
standards of this Ordinance, unless otherwise noted.
2. Each lot or building must be an element of an overall plan for site development. When the
Town of North Yarmouth Land Use Ordinance
Page 255 of 292
development consists of the creation of lots, the plan shall establish a building envelop for each
lot that identifies the area within which the buildings will be located. When the development
involves the construction of multiple buildings on one or more lots, the plan shall show the
location of each building.
3. Developments shall be designed to preserve valuable open space consistent with the town's
Open Space Plan, and any other areas worthy of conservation as established through the sketch
plan process. No dwelling units, structures associated with dwelling units, or uses accessory to
a dwelling unit shall extend into the required minimum protected open space. Open space shall
be generally contiguous, and shall be designed to connect with valuable open space or
conservation land on adjacent properties to the greatest extent possible. The creation of open
space networks and expanses of conservation land to provide wildlife habitat and corridors, to
provide land for future trail systems and passive recreation land, and to protect other cultural and
natural resources is required. The addition of open space and conservation land to the
Royal River Corridor including the Royal River, Chandler Brook and the East Branch, and Pratt's
Brook, Toddy Brook, Deer Brook including the Deer Brook wetland, and Knight's Pond, areas
that will add to protection for existing and future public water supplies are high priorities. The
Planning Board may require public access to open space areas, unless the open space is an
environmentally sensitive area where public access would be detrimental. There must be a
demonstrated need for the public access, such as access to a water body, access to a trail
system or the need for passive open space for recreation within the area.
4. Where a development abuts a water body, a portion of the land along the water shall be useable
for passive recreation. This open space land shall have a minimum depth of five hundred (500)
feet for areas abutting the Royal River, Chandler Brook and/or the East Branch. This open space
land shall have a minimum depth of one hundred fifty (150) feet for areas abutting Pratt's Brook,
Toddy Brook, Deer Brook, the Deer Brook wetland and Knight's Pond. The minimum depth
requirement of 500 feet for areas abutting the Royal River, Chandler Brook and/or the East
Branch may be reduced to two hundred fifty (250) feet only in accordance with Section 11.3.B.1,
above.
5. Notwithstanding the provisions of Section VII. Zoning District Regulations relating to minimum
lot size, street frontage and setbacks, and maximum lot coverage, the Planning Board, in
reviewing proposed clustered housing developments and open space development may modify
said provisions relating to minimum lot size, street frontage, setback, and lot coverage to permit
innovative approaches to development and environmental design in accordance with the
standards of this section. The Planning Board may reduce lot frontage and front setback
requirements as well as reduce side and rear setbacks without percentage limitation. The
Planning Board may reduce lot area requirements, but only if a net residential acreage at least
equal in area to the cumulative lot size reduction is maintained as common or public land. The
modification of these standards shall not require a variance and no finding of undue hardship
shall be required.
6. In the Farm and Forest District, Residential Shoreland District and Resource Protection
District, the following shall apply:
a. The maximum residential density for clustered housing development shall be one (1)
residential unit per three (3) net residential acres.
b. The maximum residential density for open space development shall be (1) residential unit
per ten (10) net residential acres.
c. The total area of permanently preserved open space within clustered housing developments
and open space developments shall be a minimum of fifty percent (50%) of the total area of
the parcel. The Planning Board may not waive the minimum open space requirements.
Town of North Yarmouth Land Use Ordinance
Page 256 of 292
d. No individual lots shall have direct driveway access to Routes 231, 115 or 9, or North Road.
e. No individual lots shall have direct driveway access to any other public road, which existed
prior to the time of the development, unless the applicant demonstrates to the Planning
Board's satisfaction that there is a unique situation where the configuration of the parcel and
an environmental constraint, such as a high value wetland, prohibits driveway access to an
internal subdivision road, or is preferable to impacting the high value wetland.
7. In the Village Center District and Village Residential District, the following shall apply:
[Amended 06/16/12]
a. Clustered housing development shall be a minimum of five (5) lots or five (5) residential
units.
b. The Planning Board may grant a density bonus of twenty percent (20%) for clustered housing
development that provides useable public open space for recreation pursuant to Section 10-
22 Recreation and Open Space Land in Developments, protects high value scenic vistas as
identified in the Comprehensive Plan, and/or provides affordable housing pursuant to the
provisions of Section 11.2 Affordable Housing.
c. No individual lots shall have direct driveway access to routes 9, 231, 115 or North Road.
8. All sewage disposal systems shall meet the requirements of Section 10.16. Sewage Disposal
and Section 10.23. Water Supply. [Amended 06/16/12]
9. Minimum Lot Area Requirements: [Amended 06/16/12]
a. The minimum lot area requirement may be reduced to twenty thousand (20,000) square feet
under either of the following conditions:
1) When the lot is served by public sewer, or
2) When the lot is served by an advanced wastewater treatment system where a
hydrogeological assessment pursuant to Section 10.24. Water Quality, has
demonstrated that water quality will not be degraded.
b. The minimum lot area requirement may be reduced to ten thousand (10,000) square feet
when both public water and public sewer serve the lot.
10. The Planning Board may reject a proposed Clustered Housing Development or Open Space
Development that does not permanently preserve a sufficient amount of open space, or
permanently preserve high value open space areas as identified in the Comprehensive Plan
and Open Space Plan. [Amended 06/16/12]
11. There shall be no further subdivision of lots within clustered housing developments or open
space developments located in the Farm and Forest District, Residential Shoreland District, or
Resource Protection District. The Planning Board may require that there be no further
subdivision of lots within clustered housing developments within the Village Residential District
and/or Village Center District, to maintain the long-term integrity of the development in meeting
the intent and purposes of the Clustered Housing provisions and this Ordinance. [Amended
06/16/12]
D. Other Siting Standards:
1. Buildings shall be oriented with respect to scenic vistas, natural landscape features, topography,
south-facing slopes (where possible) and natural drainage areas, in accordance with an overall
plan for site development and landscaping.
Town of North Yarmouth Land Use Ordinance
Page 257 of 292
2. Buildings shall be located within forested portions of the development and not in open fields.
When the development contains no forest, or insufficient forestland to include all buildings, the
development shall be designed to minimize views of buildings that will be visible from existing
public streets. When a development contains a scenic ridgeline, buildings should be placed fifty
(50) feet vertical distance below the ridgeline and tree removal should be limited. Restrictions
minimizing views of buildings shall be included on the plat and in the deed to each lot.
3. Buildings shall be designed and laid out to protect bedroom windows from light invasions by
vehicle headlights or glare from existing outdoor lighting or illuminated signs where allowed,
insofar as practical.
4. Where parking spaces or storage areas are located in areas abutting existing residential
properties, a permanent wood or masonry screen at least four (4) feet high shall be erected
along the property line in addition to the green perimeter strip described below.
5. Other than in the Resource Protection District, a green perimeter strip not less than twenty (20)
feet wide shall be maintained with grass, bushes, flowers, or tress along all lot lines (except for
entrance and exit driveways). Such green strip shall not be built on or paved or used for parking
or storage. There shall be no removal of trees over four (4) inches in diameter within this buffer.
In the Resource Protection District, vegetation shall be retained in its natural state, although
tree planting shall be permitted as a matter of right. Restrictions protecting this green perimeter
strip shall be included on the plat and in the deed to each lot. Alternatively, such areas may be
protected by a conservation easement.
E. Dedicated Open Space Land:
1. There shall be no further subdivision of dedicated open space. Open space land shall be used
only for agriculture, forestry, conservation, and/or non-intensive public outdoor recreational
activities that do not require modifications or improvements to the land other than access points
or trails, including bridges for trails (such as hiking, bird watching, nature study, cross country
skiing, snowmobiling and hunting). Vehicular use and hunting and trapping may be prohibited.
Subsurface sewage disposal systems, wells and easements for public utilities, but no structures,
may be permitted in open space areas.
2. Open Space land set-aside in clustered housing development or open space development shall
be protected as required by this sub-section. Land set aside as protected open space may be a
separate parcel. In Farm and Forest District, Residential Shoreland District and Resource
Protection District developments only, such land may be included as a portion of one or more
parcels on which dwellings and other structures are permitted, provided that a conservation
easement is placed on such land and that the Planning Board approves the configuration of the
open space land and finds that the proposed development plan will not compromise the
conservation value of the open space land.
3. Fee Simple Dedication to Town, State, the Royal River Conservation Trust or Other
Conservation Organization: Fee simple dedication of protected open space land to the town,
state, Royal River Conservation Trust or another conservation organization approved by the
Planning Board is an acceptable method of protection.
4. Dedication of Conservation Easement to the Royal River Conservation Trust, Town, State or
Federal Agency, or Other Conservation Organization:
a. A perpetual conservation easement restricting development may be granted to a qualified
non- for-profit conservation organization or land trust, such as the Royal River Conservation
Trust, the town, the state or a federal agency.
Town of North Yarmouth Land Use Ordinance
Page 258 of 292
b. Such conservation easement shall be approved by the Planning Board, Town Attorney, and
shall be required as a condition of approval by the Planning Board.
c. The conservation easement shall be recorded in the Cumberland County Registry of Deeds
prior to or simultaneously with the filing of the final subdivision or site plan. In the case of
minor site plans, a deed restriction enforceable by the town may be substituted for a
conservation easement.
d. The conservation easement may permit only those uses authorized through the
development review process.
5. Deed Restrictions: As a last resort in the event that a conservation easement is not accepted
by the third party or by the town, a deed restriction shall be required of the applicant, which shall
meet the requirements of these provisions.
6. Private Ownership of Open Space Land:
a. In the Farm and Forest District, Residential Shoreland District and Resource
Protection District, open space land may be owned by private landowner(s) including
individuals, families, partnerships, trusts, non-profit organizations, home/property owner's
association or governmental entity, as long as it is protected from development by
conservation easement. The open space land may occur on one or several lots, depending
on the preferences of the applicant.
b. In the Village Center District and Village Residential District, open space land shall be
set- aside in one or more parks, greens, or other recreational open space land areas owned
by a home/property owner's association or at the owner's option, dedicated to the Friends
of the Royal River, the town or an other conservation or governmental entity. A conservation
easement may be required depending upon the environmental, aesthetic, recreational,
cultural or historic significance of the land.
c. If any of the open space and/or facilities are to be reserved by the individual unit owners as
common open space, each unit owner shall own a fractional interest in the common open
space and the developer shall be required prior to final subdivision plan approval to
incorporate a homeowners' association consisting of the individual unit owners, which
incorporation must comply with Section 11.09 Home Owner/Property Owners' Associations.
7. Management and Monitoring Plan of Open Space Land:
a. Unless otherwise agreed to by the Planning Board, the cost and responsibility of managing
and monitoring dedicated open space shall be borne by the developer, property owner,
homeowner's association, Friends of the Royal River, and/or other conservation
organization approved by the Planning Board.
b. The applicant shall, at the time of the preliminary plan submission, provide a Management
and Monitoring Plan for the dedicated open space that has been approved by the entity that
will be responsible for implementing the Management and Monitoring Plan.
c. The applicant may be required to contribute sufficient funds for the maintenance and
monitoring of the dedicated open space.
d. In the event that the entity established to maintain and monitor the dedicated open space
land, or any successor thereto, fails to maintain all or any portion thereof in reasonable order
and condition, the town may assume responsibility for maintenance. The town may enter
the premises and take corrective action, and the costs of such corrective action may be
charged to the entity responsible for the management and monitoring of the open space land.
Town of North Yarmouth Land Use Ordinance
Page 259 of 292
SECTION 11.4 HOME OCCUPATIONS
A. Purpose: The purpose of these provisions is to allow home occupations to locate throughout the
town with minimal regulation provided they meet the following standards.
B. Applicability: Refer to Section 12 Definitions for a specific definition of a home occupation. The
following standards apply to all home occupations in the town.
C. Requirements: Home occupations must conform to the following standards:
1. The home occupation is owned and operated by a member or members of the family residing
within the dwelling unit. Not more than one person outside the family residing within the dwelling
unit shall be employed at the location of the home occupation.
2. The occupation or profession shall be carried on wholly within the principal building or within a
building or other structure accessory thereto.
3. The occupation is clearly incidental, compatible and secondary to the residential use of the
dwelling unit.
4. There shall be no exterior storage of materials that would be visible from a public road or an
abutter's dwelling, and no other exterior indication of the home occupation or variation from the
residential character of the principal building shall be allowed. Any exterior storage of materials
shall meet the minimum setback requirements set forth in Table 7.2 Space and Dimensional
Requirements.
5. All signs shall be in accordance with Section 8.7 Signs.
6. Lighting in and around the dwelling and any outbuildings must be consistent with the exterior
lighting for a residential dwelling.
7. The home occupation may utilize:
a. Unfinished attic and basement spaces.
b. One accessory structure.
c. The floor area utilized for the home occupation shall not exceed fifty percent (50%) of the
total floor area of the dwelling unit.
8. No traffic shall be generated by such home occupation that would be in greater volumes than
would normally be expected in the neighborhood or generate more than forty (40) vehicle trips
per day. The traffic generated by such home occupation shall not increase the volume of traffic
so as to create a traffic hazard or disturb the residential character of the immediate
neighborhood. In addition to the off-street parking provided to meet the normal requirements of
the dwelling, adequate off-street parking shall be provided for the vehicles of each employee and
the vehicles of the maximum number of users the home occupation may attract during peak
operating hours.
9. Hours of operation shall be reasonable and normal for a residential area. If the normal business
hours of operation are proposed to go beyond the hours of 5:00 a.m. to 8:00 p.m. then a
conditional use permit shall be approved by the Planning Board and the standards set forth in
subsection 13 below shall be the review criteria.
10. No nuisances, offensive noise, vibration, smoke, dust, electrical disturbance, odors, heat or
Town of North Yarmouth Land Use Ordinance
Page 260 of 292
glare shall be detectable at objectionable or unreasonable levels beyond the property limits.
SECTION 11.5 MANUFACTURED HOUSING ON INDIVIDUAL LOTS
A. Purpose: To allow manufactured housing as defined and allowed under this Ordinance to be placed
or erected on individual house lots on undeveloped lots where single family dwellings are allowed.
The review of manufactured housing shall also be pursuant to Section VII. Zoning District
Regulations. Manufactured housing shall meet the following design standards:
B. Standards and Requirements:
1. The wheels, axle and tongue shall be removed and the unit shall be placed on a permanent
foundation containing, at a minimum, a four (4) foot masonry frost wall completely surrounding
the perimeter of the unit.
2. The roof pitch shall be at least one to four (1:4). Roof shingles shall be either asphalt
composition shingles or approved wood shingles or shakes.
3. Exterior wall surfaces shall be covered with materials similar to residential, site built dwellings.
They may include clapboards, simulated clapboards such as conventional vinyl or metal siding,
wood shingles or smooth, ribbed or corrugated metal or plastic panels, except as permitted
above.
4. The minimum horizontal dimension of the unit as installed on the site is fourteen (14) feet. The
minimum floor area of the unit shall be seven hundred fifty (750) square feet.
5. The unit shall be sited on the lot so that it is within thirty (30) degrees of being parallel to the front
property line of the lot (or the chord connecting the two points where the side lot lines meet the
front line if the property line is curved). This requirement shall not apply if the width of the front
building facing, including the unit and any permanently attached additions, is more than twenty-
four (24) feet or if the unit is set back two hundred fifty (250) feet or more from the nearest street.
SECTION 11.6 MOBILE HOME PARKS [AMENDED 6/19/21]
A. Purpose: To provide review standards, performance standards and areas within the town of North
Yarmouth where mobile home parks may be located in compliance with Title 30 M.R.S., Section
4358, as amended. The review of mobile parks shall also be pursuant to Section VII. Zoning District
Regulations.
B. Standards and Requirements:
1. Except as expressly stipulated in this Ordinance to the contrary, manufactured housing parks
shall meet all the requirements for residential subdivision review, approval and performance
standards, and shall conform to all applicable state laws and local ordinances and regulations.
2. Overall Size: Manufactured Housing Parks shall not be less than twenty (20) acres in size.
3. Lot Size, Width and Density: Lot area, lot width and design standards notwithstanding the
dimensional requirements for other uses, lots in a mobile home park shall meet the following lot
area and lot width requirements:
a. Lots served by Public Sewer
Minimum Lot Area - 6,500 square feet
Minimum Lot Width - 50 feet
b. Lots served by individual subsurface wastewater disposal systems:
Town of North Yarmouth Land Use Ordinance
Page 261 of 292
Minimum Lot Area - 20,000 square feet
Minimum Lot Width - 100 feet
c. Lots served by a central subsurface wastewater disposal system approved by Maine
Department of Human Services:
Minimum Lot Area - 12,000 square feet
Minimum Lot Width - 75 feet
d. The overall density of any park served by any subsurface wastewater disposal system shall
not exceed one dwelling unit per twenty thousand (20,000) square feet of total park area.
e. Where lots front on a curved right-of-way or a reserved by a driveway, the frontage
requirement shall be measured in a straight line perpendicular to the setback line.
f.
Where applicable and to the extent not inconsistent with state law, the design standards of
Section 11.5. Manufactured Housing on Individual Lots shall apply.
g. The overall density of the mobile home park shall be the combined area of its mobile home
lots plus the area required for road rights-of-way; the area required for buffer strips; for areas
served by public sewer, an open space area for storage and recreation equal to ten percent
(10%) of the combined area of the individual lots; and the area within the shoreland setback.
4. Setback Requirements: Mobile homes in a mobile home park but adjacent to a public road
shall be set back from the public road a distance equal to the setback requirement for other
residential developments. No mobile home park lot shall have direct vehicular access onto a
public road.
5. Buffer Strips:
a. A fifty (50) foot wide buffer strip shall be provided along all property boundaries that:
1) Abut developed residential land which has a gross density of less than half of that
proposed in the park, or
2) Abut undeveloped residential land that is zoned at a density of less than half of
that proposed in the park.
Further, no structures, streets or utilities shall be placed in the buffer strip except that utilities
may cross a buffer strip to provide services to the park.
b. Within twenty-five (25) feet any property line and within the buffer strip, measured from the
exterior boundary of the park, visual screening and/or landscaping shall be provided. The
visual screening may consist of fences, beams, landscaping (such as shrubs and trees) and
natural existing vegetation. This screening shall effectively screen at least 80 percent of the
homes from the adjacent property and shall be maintained throughout the life of the project.
6. Open Space: Mobile home parks served by a public sewer, an area amounting to no less than
10 percent of the total area devoted to individual lots shall be set aside for open space and/or
recreation, if required by the Planning Board. Such space shall be accessible to and useable by
all residents of the park. Parking spaces, driveways and streets and buffer areas are not
considered useable open space, but community recreation buildings, pools and courts are
considered as open space. To the maximum extent possible, undeveloped open space shall be
left in its natural state. Improvements to make trails for walking and jogging or to make picnic
areas are permitted. The developer shall submit, as part of the application, a copy of that portion
of the proposed park rules and a plan that specifies how the open spaces are to be used and
maintained and what conditions are to apply to its use. The plan shall specify the areas to be
Town of North Yarmouth Land Use Ordinance
Page 262 of 292
dedicated to open space, recreation, and storage.
7. Road Standards:
a. Roads within mobile home parks that are to be offered for acceptances to the community
shall meet the minimum road standards of the town of North Yarmouth.
b. Privately owned roads within the mobile home park shall be designed by a Maine registered
professional engineer, and shall be built according to the requirements described below.
Where the road standards promulgated by the State Manufactured Housing Board and
adopted by the Legislature of the State of Maine conflict with the standards described below,
the Manufactured Housing Board's standards shall apply.
c. The street system of a mobile home park shall intersect with a public street.
d. Any mobile home park expected to generate average daily traffic of two hundred (200) trips
per day or more, or which is designated to contain greater than twenty-five (25) lots, shall
have at least two (2) street connections with existing public streets. Any street within park
with an average daily traffic of two hundred (200) trips per day or more, shall have at least
two (2) street connections leading to existing public streets, other streets within the park, or
other streets shown on an approved subdivision plan.
e. The intersection of any street within a park and an existing public street shall meet the
following standards:
1) Angle of intersection: The desired angle of intersection shall be ninety (90) degrees. The
minimum angle of intersection shall be seventy-five (75) degrees.
2) Maximum Grade within seventy-five (75) feet of intersection: The maximum permissible
grade within seventy-five (75) feet of the intersection shall be two percent (2%).
f.
Mobile home lots shall have vehicular access only to an interior road created for the mobile
home park.
g. Right of Way and Pavement Width:
1) Park roads shall have a minimum right of way of twenty-three (23) feet and the Planning
Board may require a minimum paved surface of 20 feet. The minimum paved width of a
one-way road shall be fourteen (14) feet. On street parking shall be prohibited along
fourteen (14) foot, one-way streets and twenty (20) foot two-lane streets.
2) Parking lanes shall be a minimum of 8 feet in width, if provided.
3) Cul-de-sac turn-arounds shall have a minimum radius of one hundred (100) feet at the
outer edge of the pavement, exclusive of any parking areas.
h. Minimum Sight Distance: A minimum sight distance of ten (10) feet for every mile per hour of
posted speed limit on the existing road shall be provided. Sight distances shall be measured
from the driver's seat of a vehicle that is ten (10) feet behind the curb or edge of shoulder line
with the height of the eye three and a half (3½) feet above the pavement and the height of
object four and a quarter (4¼ ) feet.
i.
Distance From Other Intersections: The centerline of any street within a park intersecting an
existing public street shall be no less than one hundred twenty-five (125) feet from the
centerline of any other street intersecting that public street.
j.
Parking Requirements: For each mobile home lot there shall be provided and maintained at
Town of North Yarmouth Land Use Ordinance
Page 263 of 292
least two (2) off street parking spaces.
In addition to occupant parking, off street guest and service parking shall be provided within
the boundaries of the park at a ratio of one space for each four (4) mobile home lots. Such
parking spaces shall be reserved for that sole use. The Planning Board may waive this
requirement if a parking lane is provided and will accommodate all required spaces.
8. Utility Requirements: All mobile home parks shall provide permanent electrical, water and
sewage disposal connections to each mobile home in accordance with applicable state and local
rules and regulations.
9. Sidewalks/Walkways: The mobile home park shall contain pedestrian walkways between all
units and all service and recreational facilities. Such walkways shall be adequately surfaced and
lit. A portion of the road surface may be reserved for walkways provided the roadway width is
widened accordingly. Walkways shall be a minimum width of three (3) feet.
10. Lighting: Outdoor lighting shall be provided to adequately illuminate internal streets and
pedestrian walkways.
11. Signs: Signs shall meet the requirements of Section 8.7. Signs.
12. Storage: At least three hundred (300) cubic feet of enclosed tenant storage facilities shall be
conveniently provided near or on each mobile home lot for the storage of materials and
equipment.
13. Storm Drainage: A storm drainage plan shall be prepared by a Maine registered professional
engineer showing ditching, culverts, storm drains, easements, and other proposed
improvements sufficient to accommodate a 25 -year storm.
14. Groundwater:
a. Application: For mobile home parks not served by a public sewer, the application shall include
an assessment of the impacts of park development on groundwater quality. The persons
developing or expanding a mobile home park have the burden of proving that the
development will not pollute a public or private water supply or aquifer. The assessment shall
be prepared by a Maine certified geologist or Maine registered professional engineer and
shall include the following:
1) A map showing the basic soil types;
2) The depth to the water table at representative points throughout the mobile home park;
3) Drainage conditions throughout the mobile home park;
4) Data on the existing groundwater quality, either from test wells in the mobile home park
or from existing wells on neighboring properties;
5) An analysis and evaluation of the effect of the mobile home park on groundwater
resources. The evaluation shall, at a minimum, include a projection of post development
nitrate- nitrogen concentrations and any other identified chemicals of concern at any
wells within the mobile home park, at the mobile home park boundaries and at a distance
of one thousand (1,000) feet from potential contamination sources. For mobile home
parks within the watershed of a lake, projections of the development's impact on
groundwater phosphate concentrations shall also be provided;
Town of North Yarmouth Land Use Ordinance
Page 264 of 292
6) A map showing the location of any subsurface wastewater disposal systems and
drinking water wells within the mobile home park and within two hundred (200) feet of
the mobile home park boundaries;
b. Standards for Acceptable Groundwater Impacts:
1) Projections of groundwater quality shall be based on the assumption of drought
conditions (assuming 60 percent of annual average precipitation).
2) No mobile home park shall increase any contaminant concentration in the groundwater
to more than one half of the Primary Drinking Water Standards adopted by the State of
Maine Department of Human Services. No mobile home park shall increase any
contaminant concentration in the groundwater to more than Secondary Drinking Water
Standards.
3) If groundwater contains contaminants in excess of the primary standards, and the mobile
home park is to be served by on-site groundwater supplies, the applicant shall
demonstrate how water quality will be improved or treated.
4) If groundwater contains contaminants in excess of the secondary standards, the mobile
home park shall not cause the concentration of the parameters in question to exceed
one hundred fifty (150) percent of the ambient concentration.
c. Development: Subsurface wastewater disposal systems and drinking water wells shall be
constructed as shown on the map submitted with the assessment. If construction standards
for drinking water wells are recommended in the assessment, those standards shall be
included as a note on the plan.
15. Permitted Accessory Uses:
a. Park Management Office;
b. Community or recreation buildings or structures within the park provided for use by park
residents;
c. Laundry building provided for use by residents only;
d. Service equipment building for storage of park maintenance equipment only;
e. Storage facilities for use by park residents only.
16. Park Administration: The owner and operator of a mobile home park shall be responsible for
ensuring the maintenance of all structures and their sites. Park management shall conform to
state laws. Compliance with this Ordinance shall not exempt the park owner, developer, or
manager from complying with other applicable local, state and federal codes and regulations.
The owner and operator may be required to establish to the Planning Board as part of the
mobile home park review and approval process that the owner and operator are financially and
technically capable, and the Planning Board may require any reasonable performance
guarantees allowed under Section 3.8. Performance Guarantees.
17. Conversion of Park: No development or subdivision which is approved under this section as
a mobile home park may be converted to another use without the approval of the Planning
Board, and meeting the appropriate lot size, lot width, setback and other requirements. The plan
to be recorded at the Cumberland County Registry of Deeds and filed with the town shall include
the following restrictions as well as any other notes or conditions of approval.
Town of North Yarmouth Land Use Ordinance
Page 265 of 292
a. The land within the park shall remain in a unified ownership and the fee to lots or portions
of lots shall not be transferred.
b. No dwelling unit other than a manufactured housing unit shall be located within the park.
SECTION 11.7 EXTRACTION OF EARTH MATERIALS (MINERAL EXTRACTION) [AMENDED 6/19/21]
A. Applicability: The following provisions apply to the excavation, processing, and/or storage of more
than 1,000 cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material
from its natural location within any twelve (12) month period. Associated activities, such as the
reclamation of the extraction site and the transportation of the above stated materials away from
the extraction site are also part of the regulated activity. All commercial operations over one
thousand (1,000) cubic yards per twelve (12) month period require review and permitting by the
Maine State Department of Environmental Protection (DEP). Mineral extraction and/or mineral
exploration shall require review pursuant to Section VII. Zoning District Regulations.
See also Section 9.1 Residential Shoreland District and Resource Protection District
Performance Standards, and Section 9.2 Groundwater Protection Overlay District: Best
Management Practices, as applicable.
B. Application Procedure: Applications shall be accompanied by a plan prepared according to the
performance standards and submission requirements of this Ordinance. In addition to the applicable
requirements of Section IV. Site Plan Review and Conditional Use Procedures, the plans shall
indicate the following: the location of the extraction site/processing/storage site; the property lines
and names of abutting landowners and public and private ways; the location of top bank and slope
grades, existing and as proposed upon completion of the operation; and details on proposed
fencing, buffer strips, signs, lighting, parking and loading areas, entrances and exists. A written
statement shall be submitted of the proposed method, regularity, working hours, total proposed land
area to be excavated, the volume of material to be removed and plans for the rehabilitation and
restoration of the site upon completion of the operation. The Planning Board may also require
submission of a hydrogeologic assessment to determine the effects of the proposed activity on
groundwater movements and quality within the general area. (Note: new mineral extraction
operations are prohibited in the Groundwater Protection Overlay District). The Yarmouth Water
District will be notified of any reclamation of mineral extraction operations within the Groundwater
Overlay District.
C. Standards:
1. Buffer Area Required: The operation shall be shielded from surrounding property by an
adequate buffer area of not less than two hundred (200) feet from the top of the final grade to
the property line, except that the permitting authority/Planning Board may reduce the buffer area
from the minimum requirement of two hundred (200) feet to a minimum of not less than one
hundred (100) feet provided that any excavated property remaining will be left in a condition more
useful for some future purpose conforming to the district requirements in which the excavation
site is located. Natural vegetation shall be undisturbed and maintained in buffer areas.
2. Specific plans shall be established to avoid hazards from excessive slopes and/or standing
water. In no case may soils be removed or excavated to closer than within five (5) feet of the
seasonal high-water table as may be determined by a competent authority. Where an
embankment must be left upon the completion of operations, it shall be at a slope of not steeper
than one foot vertical to three (3) feet horizontal, except that where the required buffer area has
been reduced to one hundred (100) feet the slope of the edge of the excavation area shall not
exceed one foot vertical to four (4) feet horizontal. No standing water shall be allowed to remain
longer than two (2) consecutive calendar weeks unless specifically provided for by the permitting
authority.
Town of North Yarmouth Land Use Ordinance
Page 266 of 292
3. In the case of any excavation to a depth of more than twenty (20) feet below the surface there
shall be constructed a substantial fence with suitable gates completely enclosing the property
or area in which the excavation is located. No portion of such fence shall be located closer than
forty (40) feet to the edge of such excavation. However, this condition shall not apply in the case
of an excavation or removal of lands adding slope of one foot vertical to greater than three (3)
feet horizontal.
4. No excavation shall be extended below the grade of adjacent streets unless a two hundred
(200) foot buffer strip shall be provided from the edge of the right-of-way except in cases where
a specific condition has been made with the consent of the permitting authority and other
involved parties such as, the North Yarmouth Road Commissioner, Maine Department of
Transportation and other property owners, for the reconstruction of the right-of-way and street
at a different level.
5. Provisions shall be made for the control of storm water runoff to prevent on-site erosion, and to
ensure that storm water runoff leaves the site at the same location and is not significantly
increased.
6. Reclamation: Only clean non-polluting fill (no non-natural odors, non staining, and not
originating at a known spill site) may be used for filling depressions or raising the ground level.
Sufficient topsoil shall be retained on the site or otherwise provided sufficient to cover all
disturbed areas with an average depth of not less than two (2) inches. All disturbed areas
resulting from the excavation and removal of lands or soils shall be graded and sloped to conform
to the provisions of this Ordinance, reloamed and seeded with grasses indigenous to the area
and such trees as the permitting authority may require and otherwise restore to a natural
condition. In the case of topsoil removal, the upper six (6) inches of topsoil shall be stockpiled
and restored to a depth of 6 inches throughout the site. The Planning Board may require that the
applicant submit a written recommendation from the Cumberland County Soil and Water
Conservation District for the quantities and type a vegetative cover, fertilizer and lime. Erosion
and temporary sedimentation control measures shall be employed as specified in Section 10-6.
Erosion and Sedimentation Control.
7. Loaded vehicles shall be suitably covered to prevent dust and contents from spilling or blowing
from the load.
8. All access roads leading from the extraction site to public ways shall be treated with stone or
other suitable materials to reduce mud and dust.
9. If construction equipment is stored, maintained, or fueled on site, a Spill Prevention, Control
and Containment Plan must be submitted. Any refueling area must be secured from
contamination of groundwater by an impervious layer designed by a registered professional
engineer.
10. The Planning Board may also impose reasonable permit conditions to safeguard the
neighborhood and the town, which may include but are not limited to, the following: methods of
removal or processing; days and hours of operation; type and location of temporary structures;
routes for transporting materials; area and depth of excavations; provision for temporary
drainage; disposition of stumps, brush and boulders; and cleaning and repair and/or resurfacing
of roads used in removal activity which have been adversely affected by said activity.
11. Performance Guarantee: A surety bond or performance guarantee shall be posted with the
Town Treasurer by the applicant in an amount and form approved by the permitting authority
with the advice of the Select Board sufficient to guarantee performance and conformity with the
provisions of this Ordinance and approval of the permit for the excavation and removal of lands.
Town of North Yarmouth Land Use Ordinance
Page 267 of 292
D. Existing Operations: All operations, in existence on June 14, 2005, and involving the excavation,
processing and/or storage of more than one thousand (1,000) cubic yards of soil, topsoil, loam,
sand, gravel, clay, rock, peat, or other like material from its natural location within any twelve (12)
month period may continue, but shall obtain a permit in accordance with this Ordinance by January
1, 2007. After this date, these operations shall be deemed unlawful and subject to the full penalties
provided by this Ordinance for operating without a permit. In granting a permit for these operations
the permitting authority may modify the requirements pursuant to subsection C., when the applicant
demonstrates to the Planning Board that there will not be negative impacts to groundwater and
other natural resource, public safety or to neighboring properties. The applicant must re-apply for
waivers with every permit renewal. Waivers shall not allow existing operations to become more non-
conforming.
SECTION 11.8 WIRELESS COMMUNICATIONS FACILITIES [AMENDED 6/19/21]
A. Applicability and Purpose: This section is designed and intended to balance the interests of the
residents of the town of North Yarmouth and wireless communications providers and customers in
the siting of wireless communications facilities within the town. These standards are also intended
to minimize the adverse impacts of such facilities, including visual impacts, environmental impacts,
impacts to historically significant areas, and safety impacts. The review of wireless communications
facilities shall also be pursuant to Section VII. Zoning District Regulations.
B. Exemptions: The following wireless communication facilities are exempt from these regulations:
1. One operated solely by a federally licensed amateur radio operator as part of the Amateur Radio
Service ("ham" radio operator), with a maximum tower height of seventy-five (75) feet, and
which is not additionally licensed or used for any commercial purpose, other than by the licensed
amateur radio operator.
2. One used solely for single channel business communications, such as pagers and two-way
radios, with a maximum tower height of seventy-five (75) feet.
3. One solely for municipal, public safety, or public works use, with a maximum tower height of
one hundred (100) feet.
C. Space and Bulk Standards:
1. Tower Height: Towers shall not exceed a height of one hundred (100) feet, except that where
evidence of acceptable design and co-location is provided, the Planning Board may approve an
additional twenty-five (25) feet of tower height per each additional wireless communication
service co-locator, not to exceed a maximum tower height of one hundred fifty (150) feet.
2. Antennas:
a. Height: Installing antennas on alternative tower structures is permitted, provided the
resulting alternative tower structure height does not exceed a maximum height of one
hundred fifty (150) feet. In the Village Center District the maximum height shall be the highest
point of a building or structure
b. Mounting and dimensions: The mass and dimensions of antennas on a tower or
alternative tower structure shall be governed by the following criteria:
1) Whip antennas shall not exceed twenty (20) feet in length for an individual antenna, and
shall be limited to two per mount, with no more than three mounts at a given level.
2) Microwave dish antennas: The aggregate diameters of microwave dish antennas
mounted within a twenty (20) feet vertical section of a tower may not exceed twenty-four
Town of North Yarmouth Land Use Ordinance
Page 268 of 292
(24) feet, with no single dish being more than eight (8) feet in diameter and 5 feet in depth,
unless otherwise required per the path reliability and/or tower structural studies.
3) Panel antennas: The horizontal centerline of all panel antennas of a single carrier must
be aligned in the same horizontal plane, with each antenna not to exceed eight (8) feet
in length nor two (2) feet in width.
1. Lot area: A new wireless telecommunications tower shall not be constructed on a lot that
does not conform to the minimum lot area required in the zoning district even if such lot is a
lawful non- conforming lot of record.
2. Setbacks:
a. The center of the base of any telecommunications tower must be setback a distance of at
least one hundred (100) percent of the height of the tower to any property line, or the
required minimum setback of the District in which it is located, whichever is greater.
b. Equipment facilities shall meet the required District setback.
c. If more than one tower is proposed on a single lot or parcel, they shall be clustered as closely
together as technically possible.
d. Notwithstanding the height and setback limitations within a zoning district, in order to
accommodate the co-location of an additional antenna, a tower, existing as of June 14,
2005, may be modified or rebuilt to a taller height, not to exceed a total maximum of thirty (30)
feet more than the tower's height as of June 14, 2005, but only if that additional height will
not require any lighting or obstruction painting. The additional tower height shall not require
increased lot setbacks.
e. There shall be no setback requirements for antennas mounted on alternative tower
structures. The standard District setbacks shall continue to apply for alternative tower
structures and equipment facilities, where applicable.
D. Co-location Requirements:
1. On Existing Towers: Applicants for Site Plan Review for a new wireless communication tower
must send written notice to all other such tower and alternative tower structure owners and
licensed wireless communication providers utilizing existing towers and alternative tower
structures within a one (1) mile search radius of the proposed tower, stating their siting needs
and/or co-location capabilities. An application for a new tower must include evidence that existing
or previously approved towers and alternative tower structures within the town and search area
cannot accommodate the communications equipment (antennas, cables, etc.) planned for the
proposed tower. Such evidence would be documentation must be from a qualified Maine
registered professional engineer. Shared use shall be conditioned on the applicant's agreement
to pay a reasonable fee and costs of adapting existing facilities to the proposed use.
2. Construction of New Towers: A proposal to construct a new co-located communication tower
taller than the maximum height permitted for a single wireless communication service must
include evidence that the tower can structurally support a minimum of three (3) antenna arrays for
each anticipated co-locating entity. (See subsection C.1. Tower Height, above.) Prior to the
issuance of any building permits for a co-located tower in excess of the height of a single user
tower, the applicant will submit to the CEO executed agreements documenting commitments to
co-locate from the number of co- locators approved by the Planning Board.
E. Interest of Telecommunication Entity: A proposal to construct or modify a wireless
communication tower must include evidence of a commitment from a duly licensed entity to utilize
Town of North Yarmouth Land Use Ordinance
Page 269 of 292
the tower to provide wireless communication services. All wireless communication entities, which
are contracted to locate on the tower, must join as applicants.
F. Submissions: In addition to all of the relevant Site Plan Review submission requirements listed
in Section IV. Site Plan Review and Conditional Use Procedures, the following submissions shall
be required unless waived by the Planning Board:
1. A report from a Maine registered professional engineer that describes the tower, the technical
reasons for the tower design and the capacity of the tower, including the number(s), type(s),
and volume(s) of antenna(s) that it can accommodate and the basis for the calculation of
capacity.
2. Written approval by all applicable state and federal agencies, including but not limited to the
FAA and FCC, including a description of any conditions or criteria for the approval, or a
statement from the agency that no approval is required.
3. A letter of intent that commits the tower owner and his or her successors in interest to: respond
in a timely, comprehensive manner to a request for information from a potential co-location
applicant; negotiate in good faith for shared use by third parties that have received an FCC license
or permits; allow shared use if an applicant agrees in writing to pay reasonable charges.
4. Evidence that co-location on existing or approved towers or an alternative tower structure is not
possible, per Subsection D. above. If the proposed tower cannot be accommodated on an
existing or approved tower site, the applicant must assess whether such tower site could be
changed to accommodate the proposed tower, and generally describe the means and projected
cost of shared use of the existing or approved tower site.
5. Proof of financial capacity to build, maintain, and remove the proposed tower.
6. An inventory of all of the provider's existing and approved towers, antennas or sites within the
town of North Yarmouth and locations in surrounding communities where wireless
telecommunications are proposed to be utilized in conjunction with the facility proposed in the
application.
7. Photos showing site vegetation, existing and adjacent structures, views of and from the
proposed site, topography, and land uses on the proposed parcel and on abutting properties.
8. Landscaping plan reflecting the location of proposed screening and fencing, planting areas,
proposed plantings, existing plant materials to be retained and trees or shrubs to be removed.
9. Elevation drawings, cross-sectional area or silhouette, of the facility, drawn to scale, and
showing all measurements, both linear and volumetric, showing front, sides and rear of the
proposed facility including all fencing, supporting system for transmission cables running
between the tower and accessory structures, control panels, antennas, and existing structures
and tress. Reference any design characteristics that have the effect of reducing or eliminating
visual obtrusiveness.
10. Detail of the tower base or method of attachment to a structure. If the facility will be attached to
an existing building or structure, provide measurements and elevations of the structure.
11. A visual analysis, which may include photo montage, field mock up, or other techniques, which
identifies the potential visual impacts, at design capacity, of the proposed facility. Consideration
shall be given to views from public areas as well as from private residences. The overall analysis
shall assess the cumulative impacts of the proposed facility and other existing and foreseeable
communication facilities in the area, and shall identify and include all feasible mitigation
measures consistent with the technological requirements of the proposed communication
Town of North Yarmouth Land Use Ordinance
Page 270 of 292
service.
12. Identify any other telecommunication facilities existing or proposed on the site.
13. Details of all accessory structures including buildings, parking areas, utilities, gates, access
roads, etc.
14. Structural Requirements: Telecommunication towers shall be designed and installed in
accordance with the most current standards of the Electronic Industries Association (EIA)
Structural Standards for Steel Antenna Towers and Antenna Supporting Structures. The
applicant's engineer shall provide documentation showing that the proposed transmission tower
meets or exceeds the most current standards of the American National Standards Institute
ANSI/EIA/TIA-222 for Cumberland County relative to wind and ice loads when the tower is fully
loaded with antennas, transmitters, and other equipment as described in the submitted plan.
For towers or antennas placed on buildings or alternative tower structures, the applicant shall
also provide written certification that the building or ATS itself is structurally capable of safely
supporting the tower or antennas and their accompanying equipment.
G. Wireless Communication Facilities (WCF) Design Standards:
1. Except where dictated by federal or state requirements, the Planning Board may require that a
proposed tower be camouflaged or designed to blend with the surroundings. This may include,
but is not limited to, having a galvanized finish, being painted "flat" blue gray or in a sky-tone
above the top of surrounding trees and earth-tone below treetop level.
2. Equipment facilities shall be adjacent to the tower base unless an alternative location will be
less visually obtrusive or topographic considerations require an alternative location.
3. Equipment facilities shall be no taller than one story in height and shall be treated to look like a
building or facility typically found in the area.
4. No obstruction painting or any lighting shall be permitted on any towers, except where dictated
by federal or state requirements. If lighting is required, the Planning Board may review the
available lighting alternatives and approve the design that would cause the least disturbance to
the surrounding properties and views.
5. Manually operated or motion detecting security lighting is permitted.
6. The Planning Board may require special design of the facilities where findings of particular
sensitivity are made (e.g., proximity to historic or aesthetically significant structures, views
and/or community features).
7. Sufficient anti-climbing measures and other security measures preventing access to the site
shall be incorporated into the facility, as needed, to reduce the potential for trespass and injury.
8. Antenna arrays: Antenna arrays located on an existing structure or alternative tower structure
shall be placed in such a manner so as to not be visible from a ground level view adjacent to the
structure. If, however, circumstances do not permit such placement, the antenna array shall be
placed and colored to blend into the architectural detail and coloring of the host structure.
H. Location: Wireless telecommunication facilities shall not be sited in areas of high visibility unless
the Planning Board finds that no other location is technically feasible. If the facility is to be sited
above the ridgeline it must be designed to minimize its profile by blending with the surrounding
existing natural and man-made environment. No facility shall be located so as to create a significant
threat to the health or survival of rare, threatened or endangered plant or animal species.
Town of North Yarmouth Land Use Ordinance
Page 271 of 292
I.
Additional Standards and Criteria: Mitigation measures shall be utilized to screen antennas
and towers from view from public rights-of-way or scenic vistas, either via landscaping, fencing or
other architectural screening. Creative design measures shall be employed to camouflage facilities
by integrating them with existing buildings and among other uses. Other technically feasible sites
shall be investigated and, if available, the proposed facility shall be relocated in order to minimize
the effect of the location on visually sensitive areas such as residential communities, historical areas
and open space areas.
J. Waiver Provision: The Planning Board, in its sole discretion, may modify or waive any of the
submission requirements, application procedures, or standards of this section, 11.9. Wireless
Communication Facilities, when it determines that, because of the type or size of the project or
circumstances of the site, such requirements would not be applicable or would be unnecessary to
determine compliance with the approval standards. The Planning Board must additionally
determine that such modification or waiver would not adversely affect properties in the vicinity or
the general safety and welfare of the town. The burden of proof regarding any such modification or
waiver rests solely with the applicant and must be shown to be consistent with federal and state law.
Not withstanding the authority of the Planning Board to grant a waiver, in no instance may the height
of a new tower exceed two hundred (250) feet or may the height of an alternative tower structure
be increased to more than two hundred (250) feet.
K. Amendments: Any change to existing, previously approved and proposed towers requires site plan
approval pursuant to Section VII. Zoning District Regulations. Changes include, but are not limited
to, modifications to the approved height and to the approved attachments such as antennas and
dishes as well as requests for additional attachments.
L. Removal of Abandoned Wireless Communication Facility (WCF):
1. The owner of a WCF shall notify the CEO of the date of cessation of use of the facility or any
component(s) thereof within one month from the date of such cessation. If the owner fails to
give the notice required by this paragraph, the CEO shall make a determination of such date,
which determination shall be conclusive.
2. Any WCF or component thereof that is not operated for a continuous period of twelve (12)
months shall be considered abandoned. The owner of an abandoned WCF or component
thereof shall remove it within ninety (90) days of receipt of notice from the CEO of determination
of abandonment.
3. All above ground structures, equipment, foundations, guy anchors, utilities and access roads or
driveways specifically constructed to service the tower, structures, equipment or utilities shall
be removed, and the land returned to a condition as near to the original pre-construction
condition as possible.
4. At the time of approval, the applicant for a new tower shall post a performance guarantee in the
form of a continuous corporate surety bond, an irrevocable letter of credit, or an escrow account
in favor of the town equal to one hundred twenty-five (125) percent of the estimated demolition
and removal cost of the tower and associated facilities if abandoned at any time by the applicant.
Such performance guarantee shall be satisfactory to the Select Board as to the issuer, form,
sufficiency, surety and manner of execution. All performance guarantees shall be on a
continuous basis, with any provision for cancellation to include that a minimum thirty (30) day
notice of cancellation or non-renewal be sent by certified mail to the town of North Yarmouth. If
there are two or more users of a single tower or WCF, then this provision shall not apply until all
users cease using the tower or WCF.
5. If all antennas above a manufactured connection on a tower are removed, the resulting unused
portions of the tower shall subsequently be removed within six (6) months.
Town of North Yarmouth Land Use Ordinance
Page 272 of 292
6. The replacement of all or portions of a WCF previously removed requires a new site plan
approval per Section IV. Site Plan Review and Conditional Use Procedures.
M. Inspections:
1. Inspection of towers by a Maine registered professional engineer shall be performed to insure
structural integrity. Such inspections shall be performed as follows:
a. Monopole towers: At least once every seven ( 7) years following completion of
construction. The inspection shall take place between the sixth and seventh year of the
repeat sequence.
b. Self-supporting towers: At least once every five (5) years following completion of
construction. The inspection shall take place between the fourth and fifth year of the repeat
sequence.
c. Guyed towers: At least once every three (3) years following completion of construction. The
inspection shall take place between the second and third year of the repeat sequence.
2. The inspection report shall be submitted to the CEO within thirty (30) days of its receipt by the tower
owner. Based upon the results of the inspection, the CEO may require repair or demolition of the
tower.
3. The cost of such inspections, reports, repairs or demolition required under this Section of the
Ordinance shall be borne entirely by the tower owner. Required repairs shall be completed within
ninety (90) days or less as required by the CEO for safety reasons.
4. Failure to provide required inspection reports in the required time schedule shall be deemed
primae facie evidence of abandonment.
SECTION 11.9 [RESERVED]
SECTION 11.11 ADVANCED WASTEWATER TREATMENT SYSTEMS (WHERE REQUIRED)
A. Purpose and Applicability: The purpose of this section is to preserve and protect public health,
safety, and welfare by ensuring that advanced wastewater treatment systems installed in the Town
of North Yarmouth function as designed and that owners of advanced wastewater treatment
systems provide for their proper maintenance. Advanced wastewater treatment systems are
required for lots in the Village Center District to take advantage of reduced minimum lot size
requirements, as further specified in Table 7.2, Footnote 4; are required for nursing homes and
congregate care facilities located in the Groundwater Overlay District, as further specified in Table
7.1, Footnote 4; and provide a mechanism for clustered housing developments and open space
developments to take advantage of reduced minimum lot sizes, as further specified in Section
11.3.C.9.a.2.
B. Standards and Requirements for Advanced Wastewater Treatment Systems:
1.
Nitrogen Removal.
Advanced wastewater treatment systems shall employ a denitrification process and shall have a
nitrogen removal capacity that meets the standards of NSF 245: Certification for Global Wastewater
Market Acceptance.
2.
Form HHE-300 Required.
a. The owner(s) of an advanced wastewater treatment system constructed, expanded, enlarged,
rebuilt, or replaced, on or after the effective date of this section, shall prepare, execute, and record
Town of North Yarmouth Land Use Ordinance
Page 273 of 292
in the Cumberland County Registry of Deeds a Pre-treatment Maintenance Agreement form (Form
HHE-300, prepared by Maine Department of Health and Human Services, Maine Center for
Disease Control and Prevention).
b. The owner(s) shall provide a copy of the recorded Form HHE-300 with recording information to
the CEO prior to receiving a certificate of occupancy for the dwelling unit.
c. Replacement of an advanced wastewater treatment system shall require the owner(s) of the
dwelling unit to complete and record a new Form HHE-300 and to submit a copy of the recorded
form within fourteen (14) days of the date of installation.
3.
Maintenance Agreement Required.
a. The owner(s) of a property that is served by an advanced wastewater treatment system
installed on or after the effective date of this section must execute a maintenance agreement
providing for maintenance and repair of the advanced wastewater treatment system in accordance
with the requirements of that system's manufacturer, with a company certified to provide such
maintenance. A copy of an executed maintenance agreement must be provided to the CEO within
180 days of the installation of the advanced wastewater treatment system. The property owner
shall provide the CEO with a copy of a substitute or replacement maintenance agreement within
ten (10) days of the expiration or cancellation of a prior maintenance agreement. New owners of a
property shall provide a copy of a replacement maintenance agreement, or shall provide written
certification that the previously-existing maintenance agreement has been transferred to them, to
the CEO within sixty (60) days of closing.
b. Maintenance agreements required under this section shall specify the manufacturer's
maintenance and repair requirements for the advanced wastewater treatment system, and shall
provide for annual sampling and testing of the system's effluent. The results of such effluent tests
shall be provided to the CEO and to the Yarmouth Water District (YWD) within one (1) year of the
effective date of this section, and then again by December 31 of each calendar year following.
The CEO shall annually provide written notice of this requirement to all affected property owners
on or about September 1 of each calendar year.
c. Effluent testing shall include, but not be limited to: Total Suspended Solids (TSS), Five Day
Biological Oxygen Demand (BOD5), and total nitrogen concentration.
d. The CEO and YWD shall coordinate to establish and maintain a database of advanced
wastewater treatment systems in order to enforce this provision.
4 Minimum Lot Size:
a. The minimum lot size can be reduced in the VC to 20,000 square feet when the lot is served by
an advanced wastewater treatment system, or the existing system is retrofitted with an advanced
wastewater system that that meets or exceeds the standards and requirements imposed by
Section 11.11.B of this Article.
b. GPD or gallon per day design flows may be utilized when presented and proven to not exceed
the assumed 4 bedroom or 360 gpd flows of a typical residential home per lot, this type of
development requires Planning Board approval.
c. Pocket Neighborhoods allow for the use of reduced lot size below 20,000 sf, consistent with
Section 7.6(D).
Town of North Yarmouth Land Use Ordinance
Page 274 of 292
XII.
DEFINITIONS [AMENDED 6/19/21;4/30/22; 06/17/23; 6/17/24]
For purposes of this Ordinance, the following terms, words and phrases shall have the meanings given
herein. All words not defined herein shall have their customary and usual meanings. Where so
indicated by the text, these definitions also include substantive regulations. Where reference is made to
town or state laws, ordinances, or regulations, each reference to a particular law, regulation, or section
shall include all amendments and successor sections.
Abutter: For purposes of giving notices required by this ordinance, the term abutter includes owners of
any property any portion of which is located within five hundred (500) feet of the perimeter of the
property which is the subject of the notice. For all other purposes, the term abutter means a person
whose property shares all or part of a common lot line with the property under consideration or whose
property is separated by a public or private road from the property under consideration and is located
wholly or partly opposite the property under consideration. [Amended 5/30/09]
Accessory Dwelling Unit: A self-contained dwelling unit located within, attached to or detached from a
single-family dwelling unit located on the same parcel of land.
Accessory Building or Structure: A detached or attached subordinate building or structure, the use of
which is clearly incidental and related to that of the principal building or use of land, and which is
located on the same lot as the principal building or use. For residential uses, accessory buildings and
structures shall include, but not be limited to, the following: garage, gazebo, greenhouse, home
workshop, recreational facilities for use by the occupants of the residence, such as a swimming pool or a
tennis court, and related structures.
Accessory Structure or Use (applicable withing the Residential Shoreland District and the
Resource Protection District, only): A use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated, shall not subordinate the principal use of
the lot. A deck or similar extension of the principal structure or a garage attached to the principal
structure by a roof or a common wall is considered part of the principal structure. [Amended 5/17/08]
Acre: 43,560 square feet of horizontal area.
Advanced Wastewater Treatment Systems (AWT): A wastewater treatment plant that meets the U.S.
Environmental Protection Agency secondary treatment guidelines for septic effluent when added to a
septic tank and disposal field system.
Affordable Housing Development, Village Center District:
a. For rental housing, a dwelling unit in which a household whose income does not exceed 80% of the
median income for the area as defined by the United State Department of Housing and Urban
Development under the United States Housing Act of 1937, Public Law 75-4124, 50 Stat. 888, Section
8, as amended, can afford a majority of the units that the developer designates as affordable without
spending more than 30% of the household's monthly income on housing costs.
b. For owned housing, a dwelling unit in which a household whose income does not exceed 120% of
the median income for the area as defined by the United States Department of Housing and Urban
Development under the United States Housing Act of 1937, Public Law 75-412, 50 Stat. 888, Section
8, as amended, can afford a majority of the units that the developer designates as affordable without
spending more than 30% of the household's monthly income on housing costs.
c. For purposes of this definition, "majority" means more than half of proposed and existing units on the
same lot.
Town of North Yarmouth Land Use Ordinance
Page 275 of 292
d. For purposes of this definition, "housing costs" include, but are not limited to:
1. For a rental unit, the cost of rent and any utilities (electric, heat, water, sewer, and/or trash) that
the household pays separately from the rent; and
2. For an ownership unit, the cost of mortgage principal and interest, real estate taxes (including
assessments), private mortgage insurance, homeowner's insurance, condominium fees, and
homeowners' association fees.
Affordable Housing, all other districts:
Residential dwelling units that may be rented or purchased for occupancy by buyers with low incomes and
moderate incomes as established for the Portland, ME HUD Metro FMR Area by the U.S. Department of
Housing and Urban Development. An owner-occupied housing unit is affordable to a household if the
unit's sale price is reasonably anticipated to result in monthly housing costs (including mortgage principal
and interest payments, mortgage insurance costs, homeowners' insurance costs, and real estate taxes)
that do not exceed twenty-eight percent (28%) of the household's gross monthly income. Determination
of mortgage amounts and payments are to be based on down payment rates and interest rates
generally available to households in this target group. A renter-occupied housing unit is affordable to a
household if the unit's monthly housing costs, including rent, do not exceed twenty-eight percent (28%) of
the household's gross monthly income.
Aggrieved Party: An owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit
or variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture: The production, boarding, keeping or maintenance for sale or lease of plants and/or
animals, including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy
products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green
house products. Agriculture does not include forest management and timber harvesting activities.
Agriculture does include activities on the parcel in support of the agriculture use. [Amended 5/30/09]
Airport Fueling Area: Area in which aircraft refueling occurs and in which fuel is stored.
Alternative Tower Structure (ATS): Clock towers, bell steeples, light poles, water towers, electrical
transmission line towers, smokestacks, and similar mounting structures that camouflage, conceal or
support the presence of antennas or towers.
Animal Husbandry: The raising of animals for commercial gain. Any animal husbandry operation that
files an IRS federal income tax form F shall be considered a commercial operation.
Antenna/Antenna Array: A system of one or more rods, panels, discs or similar devices used for the
transmission or reception of radio frequency (RF) signals through electromagnetic energy. These
include, but are not limited to, omni-directional antennas (whip or rod), directional antennas (panel) and
parabolic antennas (dish or disc).
Antenna Support Structure: Any pole, telescoping mast, tower tripod, or any other structure which
attaches to a tower and supports one or more antenna(s).
Applicant: The person applying for a permit or approval, including a building/land use permit, or site
plan review or subdivision approval under this Ordinance.
Aquaculture: The growing or propagation of harvestable freshwater plant or animal species. [Amended
5/17/08]
Town of North Yarmouth Land Use Ordinance
Page 276 of 292
Area Median Income: The midpoint of the region's income distribution as calculated on an annual
basis by the U.S. Department of Housing and Urban Development.
Assembly Venue: Any building, other than a place of worship, which is used as a facility for the
holding of events including meetings, weddings, wedding receptions, community meetings, or other
types of group gatherings.
Attached: Connected by a shared wall to the principal structure or having physically connected
finishing spaces.
Auto Chemical Suppliers Wholesaler: A commercial establishment that sells chemicals used for
automotive operation, repair, or maintenance to retailers; and establishment where such chemicals are
stored in bulk quantities.
Average Daily Traffic (ADT): The average number of vehicles per day that enter and exit the premises
or travel over a specific section of road.
Basal Area: The area of cross-section of a tree stem at four and a half (4½) feet above ground level
and inclusive of bark.
Basement: Any portion of a structure with a floor-to-ceiling height of six (6) feet or more and having
more than fifty (50%) percent of its volume below the existing ground level.
Bed and Breakfast: An owner-occupied building in which up to nine (9) guest rooms are used to
provide overnight accommodations for transient guests.
Best Management Practices, Groundwater Protection: Common sense operational procedures
for handling, storage and disposal of regulated substances; procedures designed to minimize the
impact of certain activities or land uses on groundwater.
Boat Launching Facility: A facility designed primarily for the launching and landing of watercraft, and
which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Buffer Area: A part of a property or an entire property, which is not built upon and is specifically
intended to separate and thus minimize the effects of a land use activity (e.g. noise, dust, visibility,
glare, etc.) on adjacent properties or on sensitive natural resources.
Building: Any structure having a roof supported by columns or walls for the shelter of persons, animals
or personal property.
Building Envelop: The two dimensional space within which a structure is permitted to be built on a lot
and that is defined by minimum setbacks and/or other areas where development is restricted.
Business and Professional Offices: Establishments primarily engaged in rendering services on a fee
or contract basis such as, but not limited to: advertising and mailing; building maintenance; employment
services; research; or the office of a member of a recognized profession maintained for the conduct of
that profession.
Campground: Any area or tract of land used to accommodate for commercial purposes two or more
parties in temporary living quarters, including but not limited to tents, recreational trailers, camping
outfits, or other shelters.
Canopy: The more or less continuous cover formed by tree crowns in a wooded area. [Amended
5/17/08]
Town of North Yarmouth Land Use Ordinance
Page 277 of 292
Cemetery: An area where dead bodies and cremated remains are buried. [Amended 6/18/11]
Centrally Managed Water System: A water system which provides water for human consumption
through pipes or other constructed conveyances to at least 15 service connections or serves an
average of at least 25 people for at least 60 days per year as regulated by 10-144 CMR Chapter 231,
Rules Relating to Drinking Water. This water system may be privately owned. The Yarmouth Water
District is a "Community Water System", which serves people in their place of residence. There are two
(2) other types of public water supplies that are regulated by state and federal law: "Non-Transient Non-
Community Water Systems" such as schools or office buildings, and "Transient Non- Community Water
Systems", which serve a constantly changing, transient population such as motels, restaurants and
campgrounds.
Certificate of Occupancy: The municipal approval for occupancy granted pursuant to 25 M.R.S.
§2357-A or the Maine Uniform Building and Energy Code adopted pursuant to Title 10, Chapter 1103 of
the Maine Revised Statutes. Certificate of occupancy may also be referred to as issuance of certificate
of occupancy or other terms with a similar intent.
Chemical Bulk Storage: Storage of a chemical or chemicals in a container or containers larger than
those intended for normal homeowner or retailer purposes. Proper, non-commercial, homeowner use of
chemicals not included.
Chemical Reclamation: Commercial processing or storage of used chemicals intended for re-use.
Clustered Housing Development: A residential development planned and developed as a whole or in
a programmed series of developments, which allows for the compact grouping of dwelling units. Cluster
developments treat the developed area as an entirety to promote flexibility in design, architectural
diversity, the efficient use of land, a reduction in the size of road and utility systems, the creation of
permanent, common open space, and the permanent retention of the natural characteristics of the land.
Code Enforcement Officer: The person duly authorized by the town to carry out the duties as
prescribed herein.
Commercial Use: The use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling of
goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Commercial Wastewater: Any wastewater from non-domestic sources, such as beauty salons or auto
body repair shops, for example. This wastewater may contain hazardous materials and requires special
treatment or disposal.
Common Open Space: Land within or related to a subdivision, not individually owned or within an
individual lot, which is designed and intended for the common use or enjoyment of the residents of the
development or the general public. It may include complementary structures and improvements,
typically used for maintenance and operation of the open space, such as for outdoor recreation.
Community Living Arrangements: As defined in 30-A M.R.S. Section 4357 - housing for eight (8) or
fewer persons with "disabilities" that is approved, authorized, certified or licensed by the state of Maine
and must be deemed a single family use. "Disabilities" have the same meaning as the term "handicap" in
the federal Fair Housing Act, 42 U.S.C. § 3602(h). "Handicap" means, with respect to a person -
1. A physical or mental impairment which substantially limits one or more of such person's major life
activities,
2. A record of having such impairment, or being regarded as having such impairment, but such term
Town of North Yarmouth Land Use Ordinance
Page 278 of 292
does not include current, illegal use of or addiction to a controlled substance.
Comparable Sewer System: Any subsurface wastewater disposal system that discharges over 2,000
gallons of wastewater per day as regulated by 10-144 C.M.R. Chapter 241, Subsurface Wastewater
Disposal Rules.
Complete Application: An application shall be considered complete upon submission of the required
fee and all information required by this Ordinance, or by a vote by the CEO or Planning Board, as
applicable, to waive the submission of required information.
Complete Substantial Construction: The completion of a portion of the improvements that represents
no less than thirty (30%) percent of the costs of the proposed improvements within a development or
subdivision. If a subdivision is to consist of individual lots to be sold or leased by the subdivider, the cost
of construction of buildings on those lots shall not be included. If the applicant proposes to construct the
buildings within the subdivision, the cost of building construction shall be included in the total costs of
proposed improvements.
Comprehensive Plan: A document or interrelated documents consistent with 30-A M.R.S. § 4326(1)-(4),
including the strategies for an implementation program which are consistent with the goals and guidelines
established pursuant to Title 30-A Chapter 187 Subchapter II.
Conditional Use: A Conditional Use is a structure or use that is generally not appropriate in a given
zoning district, but with restrictions and if controlled as to location, size and off-site impacts may have no
adverse effects upon the public health, safety or welfare, surrounding properties, the natural
environment, or on municipal services. The only structures or uses that shall be permitted as
conditional uses are those approved as Conditional Uses by the Planning Board.
Conservation Easement: A non-possessory interest in real property imposing limitations or affirmative
obligations, the purposes of which include retaining or protecting natural, scenic or open space values
of real property; assuring its availability for agricultural, forest, recreational or open space use;
protecting natural resources; or maintaining air or water quality.
Demolition Permit: Official authorization to remove part, or all, of a building or structure.
Density: The number of dwelling units per acre of land, subject to dimensional requirements.
Density, Base: The maximum number of units allowed on a lot not used for affordable housing based
on dimensional requirements in this Ordinance.
Developed Area: Any area on which a site improvement or change is made, including buildings,
landscaping, parking areas, and streets.
Designated Growth Area: An area that is designated in the Town's Comprehensive Plan as suitable
for orderly residential, commercial, or industrial development, or any combination of those types of
development, and into which most development projected over ten (10) years is directed.
Development (applicable within the Residential Shoreland District and the Resource Protection
District, only): A change in land use involving alteration of the land, water or vegetation, or the addition
or alteration of structures or other construction not naturally occurring. [Adopted 5/17/08]
Dimensional Requirements: Requirements which govern the size and placement of structures
including, but not limited to, the following requirements: building height, lot area, setbacks, minimum
frontage and lot depth.
Town of North Yarmouth Land Use Ordinance
Page 279 of 292
Disability: Any disability, infirmity, malformation, disfigurement, congenital defect or mental condition
caused by bodily injury, accident, disease, birth defect, environmental conditions or illness; and also
includes the physical or mental condition of a person which constitutes a substantial handicap as
determined by a physician or in the case of mental handicap, by a psychiatrist or psychologist, as well
as any other health or sensory impairment which requires special education, vocational rehabilitation or
related services.
District: A part, zone or geographical area within the town within which specific zoning and/or
development regulations apply.
Driveway (applicable to the Residential Shoreland and Resource Protection Districts, only): A
vehicular access-way less than five hundred (500) feet in length serving two (2) single-family dwellings
or one two-family dwelling, or less. [Amended 5/17/08]
Driveway: A vehicular access-way serving two dwelling units or less.
Drive-through Eating Place: A business where food is purchased in such a manner as to
permit customers or patrons to receive goods or services while remaining in their motor vehicles.
Domestic Wastewater: Any wastewater produced by ordinary living uses, including liquid waste
containing animal or vegetable matter in suspension or solution, or the water-carried waste from the
discharge of water closets, laundry tubs, washing machines, sinks, dishwashers, or other source of
water-carried wastes of human origin. This definition includes wastewater from commercial, industrial,
or residential sources which is of a similar quality (constituents and strength) to that produced by these
same ordinary living uses.
Duff: Decaying organic matter consisting of the dead leaves, evergreen needles, tree parts and
other organic matter typically found on the forest floor.
Duplex: A detached building used for residential occupancy by two (2) families living independently of
each other. The dwelling units are totally separated from each other by an un-pierced wall extending from
ground to roof.
Dwelling: A building designed or used as the living quarters for one or more families. The term shall
not be deemed to include motel, rooming house, lodging house, hotel, inn or trailer.
Dwelling, detached: A dwelling that is designed to be and is substantially separate from any other
building or buildings except accessory buildings.
Dwelling, Multifamily (or Multifamily Dwelling): A structure containing three (3) or more dwelling
units.
Dwelling, Single-Family Detached: A structure containing one (1) dwelling unit.
Dwelling Unit: Any part of a structure, which through sale or lease, is intended for human habitation,
including single-family housing and the separate living quarters intended for occupancy by only one
family or individual at a time contained within multifamily housing, condominiums, time-share units, and
apartments.
Emergency Operations: Operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
Essential Services: Gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
Town of North Yarmouth Land Use Ordinance
Page 280 of 292
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection or
supply systems; and associated storage tanks. Such systems may include towers, poles, wires, mains,
drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar
accessories, but shall not include service drops or buildings which are necessary for the furnishing of
such services. Essential services do not include wireless communications towers.
Expansion of a Structure: An increase in the floor area or volume of a structure, including all
extensions such as, but not limited to attached decks, garages, porches and greenhouses.
Expansion of a Use: The addition of one or more months to a use's operating season; or the use of
more floor area or ground area devoted to a particular use.
FAA: Federal Aviation Agency
Family: One or more persons occupying a premises and living as a single housekeeping unit.
Family Burial Grounds: An area where dead bodies and cremated remains are buried. Family burial
grounds must comply with all space and dimensional requirements in Table 7-1 and must comply with
all applicable state regulations. The Town shall have no maintenance obligations except as required by
state law. [Amended 6/18/11].
Farm Stand: A roadside stand not exceeding 200 square feet in floor area selling only farm, garden,
greenhouse, or nursery products, and between Labor Day and Christmas, cut Christmas trees,
garlands, wreaths and wreath material. A Farm Stand may not sell cannabis in any form.
FEMA: Federal Emergency Management Agency
Final Plan: The final drawings on which the applicant's plan of a subdivision or development is
presented to the Planning Board for approval and which, if approved, may be recorded at the
Cumberland County Registry of Deeds, in the case of a subdivision.
Floodway: The channel of a river or other watercourse and adjacent land areas that must be reserved
in order to discharge the one hundred (100) year flood without cumulatively increasing the water surface
elevation by more than one foot in height.
Floor Area (Applicable to areas outside the Residential Shoreland District and Resource
Protection District): The sum of the gross horizontal area of the floors of a building, excluding
basement floor areas.
Floor Area (Applicable to areas within the Residential Shoreland District and Resource
Protection District): The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, plus the horizontal area of any unenclosed portions of a structure such as porches and decks.
Food Processor: A commercial establishment that processes, treats, bottles, cans or otherwise
modifies food in preparation for wholesale.
Forest Management Activities: Timber cruising and other forest resource evaluation activities,
pesticide or fertilizer application, management planning activities, timber stand improvement, pruning,
regeneration of forest stands, and other similar or associated activities, exclusive of timber harvesting
and the construction, creation or maintenance of roads.
Foundation: The supporting substructure of a building or other structure, excluding wooden sills and
post supports, but including basements, slabs, frost walls, or other base consisting of concrete, block,
brick or similar material. [Amended 5/17/08]
Town of North Yarmouth Land Use Ordinance
Page 281 of 292
Fuel Oil Distributor; Fuel Oil Storage: The storage of fuel for distribution or sale. Storage of fuel oil
not for domestic use, i.e., not in tanks directly connected to burners.
Functionally Water-dependent Uses: Those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that can
not be located away from these waters. The uses include, but are not limited to commercial and
recreational fishing and boating facilities, excluding recreational boat storage buildings, finfish and
shellfish processing, fish storage and retail and wholesale fish marketing facilities, waterfront dock and
port facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels,
retaining walls, industrial uses dependent upon water-borne transportation or requiring large volumes of
cooling or processing water that can not reasonably be located or operated at an inland site, and
uses that primarily provide general public access to the water. [Amended 5/17/08]
Gas Station, Service Station: Any place of business at which gasoline, other motor fuels or motor oil
are sold to the public for use in a motor vehicle, regardless of any other business on the premises.
Ground Cover: Small plants, fallen leaves, needles and twigs, and the partially decayed organic matter
of the forest floor. [Adopted 5/17/08]
Growth Districts: Growth districts include the Village Center District and Village Residential District.
Hazardous Material: Any gaseous, liquid or solid materials, either in pure form or incorporated into
other materials, designated as hazardous by the Maine Department of Environmental Protection.
Hazardous Waste: Any substance identified under Chapter 850, Identification of Hazardous Wastes, of
the rules of the State of Maine, Department of Environmental Protection, effective date July 1, 1980,
including revisions or amendments thereto, and any radioactive waste material.
Heat Treator, Smelter, Annealer, Descaler: Commercial metal-working establishments involved with
these processes on a regular basis.
Height of a Structure: The vertical distance between the mean original (prior to construction) grade at
the downhill side of the structure and the highest point of the structure, excluding wireless
communications facilities and excluding chimneys, steeples, antennas, and similar appurtenances that
have no floor area. [Amended 5/17/08]
Height, Wireless Communications Facility Tower or Alternative Tower Structure: The vertical
distance measured from the lowest point within 10 feet of the base of the structure on the ground to the
highest point of the tower or ATS, including the base pad, all antennas and other attachments. When
towers are mounted upon buildings or other structures, the total vertical height is measured from the
lowest point within ten (10) feet of the ground level of the building or structure to the highest point of all
appurtenances on the tower.
High Intensity Soil Survey: A map prepared by a Maine Certified Soil Scientist, identifying the soil
types down to one eighth (1/8) acre or less at a scale equivalent to the subdivision plan submitted. The
soils shall be identified in accordance with the National Cooperative Soil Survey. The map shall show
the location of all test pits used to identify the soils, and shall be accompanied by a log of each sample
point identifying the textural classification and the depth to seasonal high water table or bedrock at that
location. Single soil test pits and their evaluation for suitability for subsurface waste water disposal
systems shall not be considered to constitute high intensity soil surveys.
Home Occupation: A home occupation is an occupation or profession which is: customarily carried on
in a dwelling unit or in a building or other structure accessory to a dwelling unit; carried on by a member
of the family residing in the dwelling unit; clearly incidental, compatible, and secondary to the use of the
dwelling unit of residential purposes; so located and conducted that the average neighbor, under
Town of North Yarmouth Land Use Ordinance
Page 282 of 292
normal circumstances, would not be aware of its existence. Any use that would be prohibited as a
commercial business in the Groundwater Protection Overlay District is also prohibited as a home
occupation. A home occupation must comply with the requirements of Section 11-4. Home Occupations.
[Amended 5/30/09]
Housing: Any part of a structure which, through sale or lease, is intended for human habitation,
including single-family and multifamily housing, condominiums, time-share units, and apartments. For
purposes of this rule, this does not include dormitories, boarding houses or other similar types of
housing units. This also does not include transient housing or short-term rentals, unless otherwise
allowed in this Ordinance.
Impervious Surface: That portion of a site which is or will be improved with principal and accessory
buildings and structures, and roads, driveways, parking lots, pedestrian walkways, signs and
other improvements on the surface of the ground which are more impervious than the natural surface of
the site.
Increase in Nonconformity of a Structure: Any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not limited to,
reduction in water body, tributary stream or wetland (Knight's Pond or the Deer Brook wetland) setback
distance, increase in lot coverage, or increase in height of a structure. Property changes or structure
expansions which either meet the dimensional standard or which cause no further increase in the linear
extent of nonconformance of the existing structure shall not be considered to increase nonconformity.
For example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands (Knight's Pond or the Deer Brook wetland), or tributary streams if the expansion extends no
further into the required setback area than does any portion of the existing nonconforming structure.
Hence, a structure may be expanded laterally provided that the expansion extends no closer to the
water body, tributary stream, or wetland than the closest portion of the existing structure from that water
body, tributary stream, or wetland (Deer Brook wetland or Knight's Pond). Included in this allowance are
expansions, which in-fill irregularly, shaped structures. [Amended 5/17/08]
Individual Private Campsite: An area of land which is not associated with a campground, but which is
developed for repeated camping by only one group not to exceed 10 individuals and which involves site
improvements which may include but not be limited to a gravel pad, parking area, fire place, or tent
platform.
Industrial: The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or
the extraction of minerals. [Adopted 5/17/08]
Inert Fill: Material placed on or into the ground as fill; the material will not react chemically with soil,
geologic material, or groundwater that may be present at the site.
Institutional: A non-profit or quasi-public use, or institution such as a church, library, public or private
school, hospital, or municipally owned or operated building, structure or land used for public purposes.
[Adopted 5/17/08]
Junkyard/Automobile Graveyard: A lot or part thereof, exposed to the elements, which is used for the
storage or sale of second hand products or materials, such as automobile parts, building supplies,
bottles, papers, household appliances, and/or old or scrap iron, copper, brass. Also, includes the
storage of automobiles, trucks or other motor vehicles, two or more of which have remained for a period
of 6 consecutive months either unregistered or without state inspection certificates affixed thereto.
Kennel: A commercial establishment or non-profit animal shelter in which six (6) or more dogs, cats or
other similar household pets are housed, bred, boarded, trained or sold. The number of animals in this
definition shall not include animals under the age of six (6) months.
Town of North Yarmouth Land Use Ordinance
Page 283 of 292
Land Reclamation: The placement of solid fill and materials in a formerly excavated gravel pit for the
purpose of reclamation of such gravel pit, provided, however, that all necessary Maine Department of
Environmental Protection permits have been obtained.
Land Use Ordinance: An ordinance or regulation of general application adopted by the municipal
legislative body which controls, directs, or delineates allowable uses of land and the standards for those
uses.
Large Scale Solar System: Ground Mount solar-electric system greater than five thousand (5,000) sq
ft of air space.
Level of Service: A description of the operating conditions a driver will experience while traveling on a
particular street or highway calculated in accordance with the provisions of the Highway Capacity
Manual, 1991 edition (or the most current edition), published by the National Academy of Sciences,
Transportation Research Board. There are six (6) levels of service ranging from Level of Service A, with
free traffic flow and no delays to Level of Service F, with forced flow and congestion resulting in
complete failure of the roadway.
Licensed Forester: A forester licensed under 32 M.R.S. Chapter 76. [Adopted 5/17/08]
Light Manufacturing: A business establishment engaged in the manufacturing, packaging,
processing, assembling, or testing of goods or products, provided that all operations shall be carried on
indoors and in such a manner as to confine smoke, fumes, dust, odors, and noise to the premises, and
that no operations shall constitute a hazard by reason of the potential for fire, explosion, radiation
release or other casualty.
Lot: A single parcel of developed or undeveloped land
Lot Area: The area of land enclosed within the boundary lines of a lot, minus the following: (1) land
below the normal high-water line of the Royal River, Chandler Brook and the East Branch; (2) land
below the high-water line of those sections of Toddy Brook, Pratt's Brook, Deer Brook and the
unnamed tributary to Chandler Brook that are zoned as Resource Protection Districts; and (3) land
below the upland edge of the Deer Brook Wetland or Knight's Pond, including the Knight's Pond
wetland, and areas beneath roads serving more than two lots.
Lot, Back: A lot that does not abut a street, except as allowed in Section 8-3 where the required fifty
(50) foot wide right-of-way may abut the street. [Amended 6/18/11]
Lot, Corner: A lot with at least two contiguous sides abutting a street or right-of-way.
Lot Coverage: The percentage of total area of the lot that is covered by impervious areas or surfaces,
such as buildings, roads, structures, parking lots and other non-vegetated surfaces.
Lot, Double Frontage: A lot with at least two non-contiguous sides abutting upon a street.
Lot, Interior: Any lot other than a back lot, corner lot or double frontage lot.
Lot Lines: The lines bounding a lot as defined below:
1. Front Lot Line:
a. Interior Lot: The lot line abutting the street.
b. Corner Lot or Through Lot: The lot line separating the lot from all abutting streets.
Town of North Yarmouth Land Use Ordinance
Page 284 of 292
c. Back Lot: The line closest to and most parallel to the street from which vehicular access to the
lot is gained.
2. Rear Lot Line: The lot line opposite the front lot line. On a lot pointed at the rear, the rear lot line
shall be an imaginary line between the side lot lines parallel to the front lot line, not less than ten
(10) feet long, lying farthest from the front lot line.
3. Side Lot Line: Any lot lines other than the front lot line or rear lot line.
Lot Width: For a back lot, the shortest distance between the side lot lines of the lot measured at the
front setback line. For any other lot, the distance between the side lot lines of the lot measured at the
front lot line.
Lot Width, Minimum (applicable to the Residential Shoreland District and the Resource
Protection District): The closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines. [Amended
5/17/08]
Manufactured Housing: This term shall be as defined in 30-A M.R.S. Sec. 4358, as amended, and
shall include both "mobile homes" and "modular homes" as defined therein.
Manufactured Housing on Individual Lot: Manufactured housing that meets the minimum
requirements of Section 11-5. Manufactured Housing on Individual Lots.
Mobile Home Park: A parcel of land under unified ownership approved by the town for the placement
of 3 or more manufactured homes.
Mobile Home Park Lot: The area of land on which an individual home is situated within a mobile home
park and which is reserved for use by the occupants of that home.
Marina: A business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market Value: The estimated price a property will bring in the open market and under prevailing market
conditions in a sale between a willing seller and a willing buyer, both conversant with the property and
with prevailing general price levels.
Mineral Exploration: Hand sampling, test boring, or other methods of determining the nature or extent
of mineral resources which create minimal disturbance to the land and which include reasonable
measures to restore the land to its original condition.
Mineral Extraction (applicable within the Residential Shoreland District and the Resource
Protection District): Any operation within any twelve (12) month period which removes more than one
hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from
its natural location and to transport the product removed, away from the extraction site. [Amended
5/17/08]
Mineral Extraction (applicable outside the Residential Shoreland District and the Resource
Protection District): Any operation that involves the excavation, processing, and/or storage of more
than one thousand (1,000) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material within any twelve (12) month period.
Town of North Yarmouth Land Use Ordinance
Page 285 of 292
Native: Indigenous to the local forests. [Adopted 5/17/08]
Net Residential Acreage (Applicable to Subdivisions): The area of a tract or parcel of land which,
as determined by the Planning Board, is suitable for development as a subdivision. The area shall be
calculated by subtracting the following from the total acreage of the tract or parcel:
1. Areas that are cut off from the main parcel by existing land uses, improvements, topographical
features or previous conveyances so that no means of access can be reasonably provided, and
the land is isolated and unavailable for development;
2. Areas located below the normal high water mark of water bodies (ponds, rivers, streams or brooks)
abutting or located on the parcel;
3. Areas located in the one hundred (100) year floodplain as designated on the most recently
adopted Flood Insurance Rate Map and the Flood Hazard Area Map of the National Flood
Insurance Program for the town of North Yarmouth;
4. Areas within two hundred fifty (250) feet of the Royal River, Chandler Brook and the East Branch;
5. Areas classified as wetlands as defined by the Maine Natural Resources Protection Act.
6. Areas which have been created by filling or draining a pond or wetland;
7. Areas consisting of un-reclaimed gravel pits, unless the subdivision application includes a
reclamation plan;
8. Areas having slopes greater than twenty percent (20%);
9. Areas having very poorly drained soils, and
10. Areas subject to existing rights-of-ways or easements.
In addition, fifteen (15%) percent of the total acreage of the site remaining after subtracting those areas
listed above shall be deducted as an allowance for roads, parking and rights of way, whether or not the
actual area devoted to roads is greater or less than fifteen (15%) percent. However, the fifteen (15%)
percent deduction shall not be subtracted when there are no roads planned as part of a subdivision.
For determination of poorly and very poorly drained soils, the following guidelines shall apply:
1. Soil classifications shall be developed based upon high intensity soils mapping conducted by a
Maine certified soil scientist, in accordance with the standards established by the Maine Association
of Professional Soil Scientists and the National Cooperative Soils Survey unless waived by the
Planning Board pursuant to number two (2) below.
2. In cases where the requirement of a high intensity soils map is waived by the Planning Board,
deductions for unsuitable soils shall be determined in the following manner: Land areas with a water
table within 6 inches of the surface for three (3) or more months a year shall be deducted. In
making this determination, the Planning Board shall consider medium-intensity soils maps,
perform site visits, consult experts and review other available information as provided by the
applicant.
Net Residential Density: Net residential density shall mean the number of dwelling units per net
residential acre.
Non-conforming Building or Structure: A building or structure, which does not meet any one or more
Town of North Yarmouth Land Use Ordinance
Page 286 of 292
of the following dimensional requirements: setback, height, or lot coverage, but which is allowed solely
because it was in lawful existence at the time this ordinance or subsequent amendment took effect.
[Amended 5/17/08]
Non-conforming Condition: Non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this ordinance or subsequent amendment took effect. [Adopted
5/17/08]
Non-conforming Lot: A single lot of record which, at the effective date of this ordinance or amendment
of this ordinance, does not meet the minimum lot area, net lot area per dwelling unit, minimum street
frontage, or other similar lot requirements of the district in which it is located. It is allowed solely
because it was in lawful existence at the time this ordinance or subsequent amendment took effect.
[Amended 5/17/08]
Non-conforming Use: Use of buildings, structures, premises, land or parts thereof which is not
permitted in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this ordinance or subsequent amendment took effect. [Amended 5/17/08]
Non-Domestic Wastewater: Any wastewater from commercial, industrial, or residential sources which
has constituents unlike that of or of significantly higher strength than that of domestic wastewater.
Normal High-water Line: That line which is apparent from visible markings, changes in the character
of soils due to prolonged action of the water or changes in vegetation, and which distinguishes between
predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers (Royal River,
Chandler Brook, East Branch of Chandler Brook) that support non-forested wetland vegetation and
hydric soils and that are at the same or lower elevation as the water level of the river during the period of
normal high-water are considered part of the river. [Amended 5/17/08]
One Hundred-Year (100-year) Floodplain: Means the flood having a one percent chance of being
equaled or exceeded in any given year. Referred to as the "base flood" within the town's Floodplain
Management Ordinance.
Open Space: The portion of a lot or site which is maintained in its natural state or planted with grass,
shrubs, trees or other vegetation and which is not occupied by buildings, structures or other impervious
surfaces. A significant portion of the open space should include high value open space areas as
identified in the Comprehensive Plan.
Open Space Development: A subdivision with a very low residential density, less than one (1)
residential unit on ten (10) acres, designed to preserve open space, and in particular to permanently
preserve high value open space as defined in the Comprehensive Plan.
Parcel of Land: All contiguous land in the same ownership, provided that lands located on opposite
sides of a public street or private road shall be considered each a separate tract or parcel of land unless
the road was established by the owner of land on both sides thereof.
Passive Recreation: Leisure activities, including but not limited to walking, picnicking, and hiking, that
are of an informal nature, do not take place at prescribed sites of fields, and usually do not require
extensive equipment. Passive recreation odes not include team sports or the use of motorized vehicles.
Person: An individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Beyond the Normal
High-Water Line or Within a Wetland:
Town of North Yarmouth Land Use Ordinance
Page 287 of 292
Temporary: Structures that remain in or over the water for less than seven (7) months in any period
of twelve (12) consecutive months.
Permanent: Structures that remain in or over the water for seven (7) months or more in any period of
twelve (12) consecutive months.
Planning Board: Means the Town of North Yarmouth Planning Board.
Pond: A naturally occurring inland body of water, but not including great ponds as defined by the Maine
Natural Resources Protection Act, 38 M.R.S. § 480-B(5).
Potable: Water safe for drinking as defined by the U.S. Environmental Protection Agency's (EPA)
Drinking Water Standards and Health Advisories Table and Maine's interim drinking water standards for
six different perfluoroalkyl and polyfluoroalkyl substances (PFAS), Resolve 2021 Chapter 82, Resolve,
To Protect Consumers of Public Drinking Water by Establishing Maximum Contaminant Level for
Certain Substances and Contaminants.
Preliminary Plan: The preliminary drawings indicating the proposed layout of the subdivision to be
submitted to the Planning Board for its consideration.
Principal Structure: A structure in which the main or principal use of the property is conducted.
Principal Use: The primary use to which the premises are devoted, and the main purpose for which
the premises exist. A principal use is a use other than one that is wholly incidental or accessory to
another use on the same premises.
Professional Engineer: A professional engineer, registered in the State of Maine.
Public Facility: Any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity. [Adopted 5/17/08]
Public Utilities: Are facilities for the transmission or distribution of water, gas, electricity, or
communication; or for the collection, treatment or disposal of wastes. This definition shall not include
wireless communications towers or facilities.
Recent Flood Plain Soils: The following soil series as described and identified by the National
Cooperative Soil Survey: Fryeburg, Hadey, Limerick, Lovewell, Medomak, Ondawa, Alluvial, Cornish,
Charles, Podunk, Rumney, Saco, Suncook, Sunday, Winooski. [Amended 5/17/08]
Recreational Facility: A place designed and equipped for the conduct of sports, leisure time activities,
and other customary and usual recreational activities, excluding boat-launching facilities.
Recreational Vehicle: A vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle
and not as a structure, the unit must remain with its tires on the ground, and must be registered with the
Maine Bureau of Motor Vehicles.
Replacement System (sewage disposal): A system intended to replace: (a) an existing system which
is either malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or (b) any existing overboard wastewater discharge. [Adopted 5/17/08]
Residual Basal Area: The average of the basal area of trees remaining on a harvested site. [Amended
5/17/08]
Town of North Yarmouth Land Use Ordinance
Page 288 of 292
Restaurant: A business establishment where food and drink are prepared, served, and consumed
primarily within the principal building. Providing food to patrons shall clearly be the primary use and the
serving of alcoholic beverages shall be ancillary (see Tavern).
Restrictive Covenant: A provision in a deed, or other covenant conveying real property, restricting the
use of the land.
Retail Sales and Services: Any business engaged in the sale of goods or services to the ultimate
consumer for direct consumption and/or use.
Right-of-way: An area or strip of land described in a recorded deed and dedicated to the purpose of
providing access to a parcel or parcels of land other than the land on which the right-of-way crosses.
No land in the right-of-way may be used to meet any dimensional requirements of this Ordinance.
Riparian: Riparian areas are plant communities contiguous to and affected by surface and subsurface
hydrogeological features or bodies of water and wetlands. Riparian areas have one or more or both of
the following characteristics: (a) distinctly different vegetative species than adjacent areas; (b) species
similar to adjacent areas but exhibiting more vigorous or robust growth forms; and/or (c) riparian areas
are usually transitional between wetland and upland.
Riprap: Rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and
soil stabilization, typically used on ground slopes of two (2) units horizontal to one unit vertical or less.
River: Rivers include the free flowing length of the Royal River, Chandler Brook and the East Branch
including the wetlands associated with these rivers. (See definition of "wetlands associated with rivers")
Road (applicable outside the Residential Shoreland District and the Resource Protection
District): A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles. [Amended 5/17/08]
Road (applicable within the Residential Shoreland District and the Resource Protection
District): A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding driveways,
as defined. [Amended 5/17/08]
Rural Districts: Rural districts include the Farm and Forest District, Residential Shoreland District and
Resource Protection District.
Service Drop: Any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1. In the case of electric service
a. The placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b. The total length of the extension is less than one thousand (1,000) feet.
2. In the case of telephone service
a. The extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. The extension requiring the installation of new utility poles or placement underground is less
than one thousand (1,000) feet in length.
Town of North Yarmouth Land Use Ordinance
Page 289 of 292
Setback: The horizontal distance from a lot line, shoreline, or road to the nearest part of a structure or
other regulated object or area as defined in this Ordinance.
Setback from the Water: The nearest horizontal distance from the normal high-water line of a water
body, tributary stream, or the upland edge of a wetland, including Deer Brook wetland and Knight's
Pond, to the nearest part of a structure, road, parking space or other regulated object or area. [Amended
5/17/08]
Shore Frontage: The length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline. [Amended 5/17/08]
Shoreland Zone: The land areas located within two hundred fifty (250) feet, horizontal distance, of the
normal high-water line of the Royal River, Chandler Brook and the East Branch; within two hundred fifty
(250) feet of the upland edge of the Deer Brook wetland and Knight's Pond; or within seventy-five (75)
feet, horizontal distance, of the normal high-water line of sections of Toddy Brook, Pratt's Brook, Deer
Brook, and the unnamed tributary to Chandler Brook. These areas are zoned as Resource Protection or
Residential Shoreland Districts as displayed on the Town of North Yarmouth Zoning Map. [Adopted
5/17/08]
Shoreline: The normal high-water line, or upland edge of a wetland. [Adopted 5/17/08]
Sign: An object, device, display or structure, or part thereof, situated outdoors or indoors, which is used
to advertise, identify, display, direct or attract attention to an object, person, institution, organization,
business, product, service, event or location by any means, including words, letters, figures, design,
symbols, fixtures, colors, illumination or projected images.
Sight Distance: The length of an unobstructed view from a particular access point to the farthest
visible point of reference on a street. Used in this Ordinance as a reference for unobstructed street
visibility.
Sketch Plan: Conceptual maps, renderings, and supportive data describing the project proposed by
the applicant for initial review prior to submitting an application for subdivision or development approval.
Sludge: Residual material produced by water or sewer treatment processes, industrial processes,
or domestic septic tanks.
Small Brewery: "Small brewery" means a facility that brews, lagers and kegs, bottles or packages its
own malt liquor, not to exceed thirty thousand (30,000) barrels per year.
Small Distillery: "Small distillery" means a distiller that produces spirits in an amount that does not
exceed fifty thousand (50,000) gallons per year.
Small Winery: "Small winery" means a facility that ferments, ages, and bottles:
a. Up to fifty thousand (50,000) gallons per year of its own wine that is not hard cider and
b. Up to three thousand (3,000) barrels per year of its own wine that is hard cider.
Snow Dump: A location to which snow is transported and dumped by commercial, municipal, or
state snowplowing operations.
Storm Water Impoundment: Any structure designed and constructed to contain storm water runoff.
Stream: A "river, stream or brook" as defined by the Maine Natural Resource Protection Act.
Street: An existing state, county, or town way; a way dedicated for public use and shown upon a
Town of North Yarmouth Land Use Ordinance
Page 290 of 292
subdivision plan approved by the Planning Board and recorded in the Cumberland County Registry of
Deeds; or a way dedicated for public use and shown on a plan duly recorded in the Cumberland County
Registry of Deeds prior to the establishment of the Planning Board and the grant to the Planning Board
of its power to approve plans. The term "street" shall not include those ways that have been
discontinued or abandoned, nor shall it include a private easement or right of way not dedicated for
public use.
Street Frontage: The width of the lot as it fronts the street.
Structure: Anything temporarily or permanently located, built, constructed or erected for the support,
shelter or enclosure of persons, animals, goods or property of any kind, as defined in 38 M.R.S. § 436-
A(12).
Subdivision: As defined in Title 30-A, M.R.S., Section 4401, as amended.
Subdivision, Major: Any subdivision containing more than four lots.
Subdivision, Minor: A subdivision containing not more than four lots. If a street or other municipal,
water or sewer facilities are proposed, the Planning Board may require that the subdivision be reviewed
as a major subdivision.
Substantial Start: Completion of thirty (30%) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface Sewage Disposal System: Any system designed to dispose of waste or waste water on
or beneath the surface of the earth: includes, but is not limited to: septic tanks; disposal fields;
advanced wastewater treatment systems; grandfathered cesspools: holding tanks; pretreatment filter,
piping, or any other fixture, mechanism, or apparatus used for those purposes; does not include any
discharge system licensed under title 38 M.R.S. Section 414, any surface water disposal system, or any
municipal or quasi- municipal waste water treatment system.
Sustained slope: A change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tavern: A business establishment, serving either the public or a private party, where beverages and/or
food are prepared, served, and consumed predominantly within the principal building. Serving
beverages shall clearly be the primary use and providing food shall be ancillary (see Restaurant).
Temporary Housing: The CEO may issue permits for temporary housing for a period not to exceed six
(6) months with one six (6) month renewal possible. This provision is limited to the intended occupants
of a permanent dwelling unit that is being constructed or repaired and for which a Certificate of
Occupancy will be sought.
Timber Harvesting: The cutting and removal of trees from their growing site, and the attendant
operation of cutting and skidding machinery but not the construction or creation of roads. Timber
harvesting does not include the clearing of land for approved construction.
Transfer Station: Facility designed for temporary storage of discarded material intended for transfer to
another location for disposal or re-use.
Tributary Stream (only applicable to the Residential Shoreland District and the Resource
Protection District): A channel between defined banks created by the action of surface water, whether
intermittent or perennial, and which is characterized by the lack of upland vegetation or presence of
aquatic vegetation and by the presence of a bed devoid of topsoil containing waterborne deposits on
exposed soil, parent material or bedrock, and which flows to the Royal River, Chandler Brook, the East
Town of North Yarmouth Land Use Ordinance
Page 291 of 292
Branch, sections of Toddy Brook, Pratt's Brook, Deer Brook, and the unnamed tributary to Chandler
Brook, that are zoned as Resource Protection, or the Deer Brook wetland or Knight's Pond as displayed
on the Zoning Map. This definition does not include the term "stream" as defined elsewhere in this
Ordinance.
Upland Edge of a Wetland: The boundary between upland and wetland, including the Deer Brook
wetland and Knight's Pond. The upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland vegetation, but
such vegetation is dominated by woody stems that are six (6) meters tall (approximately twenty (20) feet)
or taller. [Amended 5/17/08]
Variance: A variance is a relaxation of the terms of this Ordinance. A variance may only be authorized
by the Zoning Board of Appeals pursuant to Section VI. Variances and Appeals.
Vegetation: All live trees, shrubs, ground cover, and other plants including without limitation, trees both
over and under 4 inches in diameter, measured at four and a half (4½) feet above ground level.
Velocity Zone: An area of special flood hazard extending from offshore to the inland limit of the
primary frontal dune along an open coast and any other area subject to high velocity wave action from
storms or seismic sources.
Vernal Pool: A naturally occurring, temporary to permanent body of water in shallow depressions that
fill during the spring and fall and may be dry during the summer. The vernal pool contains no viable
populations of predatory fish, and it provides primary breeding habitat for wood frogs, spotted
salamanders, blue-spotted salamanders, and fairy shrimp and provides habitat for other wildlife
including several endangered and threatened species. The presence of one or more of these species is
usually conclusive evidence of a vernal pool.
Volume of a Structure: The volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water Body: Any river or stream with Resource Protection zoning to include the Royal River, Chandler
Brook, the East Branch, and sections of Toddy Brook, Pratt's Brook, Deer Brook and an unnamed
tributary to Chandler Brook, as depicted on the Zoning Map.
Water Crossing: Any project extending from one bank to the opposite bank of a river or stream,
whether under, through, or over the watercourse. Such projects include but may not be limited to roads,
fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these
crossings. This definition includes crossings for timber harvesting equipment and related activities.
[Amended 5/17/08]
Water Source Protection Area: The area with one thousand (1,000) foot radius of a public water supply
as defined herein, and for the Yarmouth Water District the area within the Groundwater Protection
Overlay District.
Wellhead: The specific location of a well (a hole or shaft dug or drilled to obtain water) and/or any
structure built over or extending from a well.
Wetland: A freshwater wetland, as defined by the Maine Natural Resource Protection Act1
1 A fresh water wetland means fresh water swamps, marshes, bogs and similar areas that are: inundated or saturated by surface or groundwater
at a frequency and for a duration sufficient to support, and under normal circumstances do support, a prevalence of wetland vegetation typically
adapted for life in saturated soils; and not considered part of great pond, coastal wetland, river, stream or brook. (38 M.R.S. Section 480-B, or as
amended).
Town of North Yarmouth Land Use Ordinance
Page 292 of 292
Wetlands Associated Rivers: Wetlands contiguous with or adjacent to the Royal River and the portion
of Chandler Brook from its confluence with the East Branch to the Royal River, and which during normal
high water are connected by surface water to the river. Also included are wetlands that are separated
from the river by a berm, causeway, or similar feature less than 100 feet in width, and which have a surface
elevation at or below the normal high water line of the river. Wetlands associated with rivers are
considered to be part of that river.
Wetland, Forested: A wetland dominated by woody vegetation that is six (6) meters tall (approximately
twenty (20) feet) or taller. [Amended 5/17/08]
Wetland, High Value: A freshwater wetland, as defined by the Maine Natural Resource Protection Act,
which meets one or more of the following criteria:
1. Contains a pond or a vernal pool;
2. Lies within the one hundred (100) year floodplain of a stream or a pond;
3. More than fifty (50%) percent of the dominant species in all strata of the vegetation consist of
facultative wetland or obligate wetland plant species, as listed in the National List of Plant Species
that Occur in Wetlands, by the U.S. Fish and Wildlife Service, latest edition.
Wetland, Low Value: A fresh water wetland, as defined by the Natural Resource Protection Act, which
does not meet the criteria of a high value wetland.
Wireless Communications: Any personal wireless services as defined in the Federal
Telecommunications Act of 1996 which includes FCC licensed commercial wireless
telecommunications services including cellular, personal communications services (PCS), specialized
mobile radio (SMR), enhanced specialized mobile radio (ESMR), paging, and similar services that
currently exist or that may in the future be developed.
Wireless Communication Facility (WCF): A facility that transmits, receives, distributes, provides or
offers telecommunications services, radio or television signals, or any other spectrum-based
transmissions/receptions, together, with the facility's associated antennas, microwave dishes, horns,
cables, wires, conduits, ducts, lightning rods, electronics and other types of equipment for the
transmission, receipt, distribution or offering of such signals; wireless communication towers, antenna
support structures, and other structures supporting said equipment and any attachments to those
structures including guy wires and anchors, equipment buildings, generators, parking areas, utility
services, driveways and roads and other accessory features.
Wireless Communication Facility - Co-Located: A wireless telecommunications facility that includes
a wireless communication tower or ATS supporting one or more antennas and owned or used by more
than one public or private entity.
Wireless Communication Tower (Tower): A structure designed and constructed specifically to
support an antenna array. A tower may be a monopole, self-supporting (lattice) tower, guy-wire support
tower and other similar structure, and includes all supporting lines, cables, wires, and braces.
Woody Vegetation: Live trees or woody, non-herbaceous shrubs. [Adopted 5/17/08]
Zoning Board of Appeals or ZBA: Means the Town of North Yarmouth Zoning Board of Appeals.