This is the exact embedded text of the captured official document.
Snapshot 6ebe760a85cb · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of Northport
Shoreland Zoning
Ordinance
Originally enacted June 29, 1992
Amended May , 2009
Amended June 1, 2015
Amended June 6, 2022
Town of Northport Shoreland Zoning Ordinance
2
This page left intentionally blank.
Town of Northport Shoreland Zoning Ordinance
3
Contents
Section 1.
Purposes. .................................................................................................................. 4
Section 2.
Authority. ................................................................................................................. 4
Section 3.
Applicability. ............................................................................................................. 4
Section 4.
Effective Date ............................................................................................................ 4
Section 5.
Availability. ............................................................................................................... 5
Section 6.
Severability. .............................................................................................................. 5
Section 7.
Conflicts with Other Ordinances. ............................................................................. 5
Section 8.
Amendments. ........................................................................................................... 5
Section 9.
Districts and Zoning Map ......................................................................................... 6
Section 10. Interpretation of District Boundaries. .................................................................... 6
Section 11. Land Use Requirements. .......................................................................................... 6
Section 12. Non-conformance. ................................................................................................... 7
Section 13. Establishment of Districts ...................................................................................... 13
Section 14. Table of Land Uses. ................................................................................................ 14
Section 15. Land Use Standards. .............................................................................................. 18
Section 16 Administration................................................................................................................42
Section 17. Definitions. ............................................................................................................. 51
Town of Northport Shoreland Zoning Ordinance
4
Shoreland Zoning Ordinance for the Town of Northport
_____________________________
Section 1.
Purposes.
The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic
life, bird and other wildlife habitat; to protect buildings and lands from flooding and
accelerated erosion; to protect archaeological and historic resources; to protect freshwater
wetlands; to control building sites, placement of structures and land uses; to conserve shore
cover, and visual as well as actual points of access to inland waters; to conserve natural beauty
and open space; and to anticipate and respond to the impacts of development in shoreland
areas.
Section 2. Authority.
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435-
449 of the Maine Revised Statutes Annotated (M.R.S.A.).
Section 3.
Applicability.
This Ordinance applies to all land areas within 250 feet, horizontal distance of
normal high-water line of any great pond or river,
upland edge of a coastal wetland, including all areas affected by tidal action, or
upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a
stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending or located below the normal high-water line of a water body or
within a wetland.
Section 4. Effective Date
Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
adopted by the municipal legislative body on June 29, 1992 and amended May 2009 and
amended June 1, 2015 and amended June 4, 2018 shall not be effective unless approved by the
Commissioner of the Department of Environmental Protection. A certified copy of the
Ordinance, or Ordinance Amendment, attested and signed by the Municipal Clerk, shall be
forwarded to the Commissioner for approval. If the Commissioner fails to act on this
Town of Northport Shoreland Zoning Ordinance
5
Ordinance or Ordinance Amendment, within forty-five (45) days of his/her receipt of the
Ordinance, or Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day
period shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the
Ordinance, or Ordinance Amendment, is approved by the Commissioner.
Section 5.
Availability.
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible
to any member of the public. Copies shall be made available to the public at reasonable cost at
the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
Section 6.
Severability.
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
Section 7.
Conflicts with Other Ordinances.
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision
of this Ordinance or of any other ordinance, regulation or statute administered by the
municipality, the more restrictive provision shall control.
Section 8.
Amendments.
This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the
Commissioner of the Department of Environmental Protection following adoption by the
municipal legislative body and shall not be effective unless approved by the Commissioner. If
the Commissioner fails to act on any amendment within forty-five (45) days of his/her receipt
of the amendment, the amendment is automatically approved. Any application for a permit
submitted to the municipality within the forty-five (45) day period shall be governed by the
terms of the amendment, if such amendment is approved by the Commissioner.
Town of Northport Shoreland Zoning Ordinance
6
Section 9.
Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are
hereby divided into the following districts as shown on the Official Shoreland Zoning Map(s)
which is (are) made a part of this Ordinance:
1. Resource Protection
2. Stream Protection
3. General Development
B. Scale of Map.
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000
feet. District boundaries shall be clearly delineated and a legend indicating the symbols for
each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map.
The Official Shoreland Zoning Map shall be certified by the attested signature of the
Municipal Clerk and shall be located in the municipal office. In the event the municipality
does not have a municipal office, the Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map.
If amendments, in accordance with Section 8, are made in the district boundaries or other
matter portrayed on the Official Shoreland Zoning Map, such changes shall be made on the
Official Shoreland Zoning Map within thirty (30) days after the amendment has been
approved by the Commissioner of the Department of Environmental Protection.
Section 10.
Interpretation of District Boundaries.
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are
property lines, the centerlines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact location of district
boundary lines, the Board of Appeals shall be the final authority as to location.
Section 11.
Land Use Requirements.
Except as hereinafter specified, no building, structure or land shall hereafter be used or
occupied, and no building or structure or part thereof shall hereafter be erected, constructed,
expanded, moved, or altered and no new lot shall be created except in conformity with all of
Town of Northport Shoreland Zoning Ordinance
7
the regulations herein specified for the district in which it is located, unless a variance is
granted.
Section 12.
Non-conformance.
A. Purpose.
It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set
forth in Section 12. Except as otherwise provided in this Ordinance, a non-conforming
condition shall not be permitted to become more non-conforming.
B. General
1. Transfer of Ownership. Non-conforming structures, lots, and uses may be
transferred, and the new owner may continue the non-conforming use or continue
to use the non-conforming structure or lot, subject to the provisions of this
Ordinance.
2. Repair and Maintenance. This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures including repairs
or renovations that do not involve expansion of the non-conforming use or
structure, and such other changes in a non-conforming use or structure as federal,
state, or local building and safety codes may require.
C. Non-conforming Structures
1. Expansions. All new principal and accessory structures, excluding functionally
water-dependent uses, must meet the water body, tributary stream, or wetland
setback requirements contained in Section 15(B)(1). A non-conforming structure may
be added to or expanded after obtaining a permit from the same permitting authority
as that for a new structure, if such addition or expansion does not increase the non-
conformity of the structure and is in accordance with subparagraphs (a) and (b) below.
a. Expansion of any portion of a structure within 25 feet of the normal high-
water line of a water body, tributary stream, or upland edge of a wetland is
prohibited, even if the expansion will not increase nonconformity with the water
body, tributary stream or wetland setback requirement. Expansion of accessory
structure that is located closer to the normal high-water line of a water body,
triburity stream, or upland edge of a wetland than the principal structure is
Town of Northport Shoreland Zoning Ordinance
8
prohibited, even if the expansion will not increase noncomfority with the water
body, tributary stream, or wetland setback requirement. (partial )
(b) Notwithstanding paragraph (a), above, if a legally existing noncoforming
principal structure is entirely located less than 25 feet from the normal high-
water of a water body, tributary stream, or upland edge of a wetland, that
structure may be expanded as follows, as long as all other applicable municipal
land use standards are meet and the expansion is not prohibited by Section
12(C)(1). (wholly within)
(i) The maximum total footprint for the principal structure may not be
expanded to a size greater than 800 square feet or 30% larger than the
footprint that existed on January 1, 1989, whichever is greater. The
maximum height of the principal structure may not be made greater
than 15 feet or the the height of the existing structure, whichever is
greater.
(c) All other legally existing nonconforming principal and accessory structures
that do not meet the water body, tributary stream, or wetland setback
requirements may be expanded Or altered as follows, as long as other applicable
municipal land use standards are met and the expansion is not prohibited by
Section 12(C)(1)(a), above.
(i) For structures located less than 75 feet from the normal high-water line of
a water body, tributary stream, or upland edge of a wetland, the
maximum combined total footprint for all structures may not be
expanded to a size greater than 1,000 square feet or 30% larger than the
footprint that existed on January 1, 1989, whichever is greater. The
maximum height of any structure may not be made greater than 20 feet
or the height of the existing structure, whichever is greater.
(ii) For structures located less than 100 feet from the normal high-water line
of a great pond classified as GPA or a river flowing to a great pond
classified as GPA, the maximum combined total footprint for all
structures may not be expanded to a size greater than 1,500 square feet
or 30% larger than the footprint that existed on January 1, 1989,
whichever is greater. The maximum height of any structure may not be
made greater than 25 feet or the height of the existing structure,
whichever is greater. Any portion of those structures located less than 75
feet from the normal high-water line of a water body, tributary stream,
or upland edge of a wetland must meet the footprint and height limits in
Section 12(C)(1)(b)(i) and Section 12(C)(1)(c)(i), above.
(iii)In addition to the limitations in subparagraphs (i) and (ii), for structures
that are legally nonconforming due to their location within the Resource
Town of Northport Shoreland Zoning Ordinance
9
Protection District when located at less than 250 feet from the normal
high-water line of a water body or the upland edge of a wetland, the
maximum combined total footprint for all structures may not be
expanded to a size greater than 1,500 square feet or 30% larger than the
footprint that existed at the time the Resource Protection District was
established on the lot, whichever is greater. The maximum height of any
structure may not be made greater than 25 feet or the height of the
existing structure, whichever is greater, except that any portion of those
structures located less than 75 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland must meet
the footprint and height limits in Section 12(C)(1)(b)(i) and Section (C)(1)
or Section 12(C)(1)(a), above.
(d) An approved plan for expansion of a nonconforming structure must be
recorded by the applicant with the registry of deeds, within 90 days of
approval. The recorded plan must show:
1. The existing and proposed footprint of the nonconforming structure
2. the existing and proposed structure height,
3. the footprint of any other structures on the parcel,
4. the shoreland zone boundary to include the 25', 75' and 250' measurements
5. and evidence of approval by the municipal review authority.
2.Foundations.
Whenever a new, enlarged, or replacement foundation is constructed
under a non-conforming structure, the structure and new foundation must be
placed such that the setback requirement is met to the greatest practical extent
as determined by the Planning Board or its designee, basing its decision on the
criteria specified in Section 12(C3)Relocation, below.
3. Relocation. A non-conforming structure may be relocated within the boundaries
of the parcel on which the structure is located provided that the site of relocation
conforms to all setback requirements to the greatest practical extent as determined by
the Planning Board or its designee, and provided that the applicant demonstrates that
the present subsurface sewage disposal system meets the requirements of State law
and the State of Maine Subsurface Wastewater Disposal Rules (Rules), or that a new
system can be installed in compliance with the law and said Rules. In no case shall a
structure be relocated in a manner that causes the structure to be more non-
conforming.
In determining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board or its designee shall consider the size of the lot, the
slope of the land, the potential for soil erosion, the location of other structures on the
property and on adjacent properties, the location of the septic system and other on-site
Town of Northport Shoreland Zoning Ordinance
10
soils suitable for septic systems, and the type and amount of vegetation to be removed
to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in
order to relocate a structure, the Planning Board shall require replanting of native
vegetation to compensate for the destroyed vegetation in accordance with Section
15(P-3). In addition, the area from which the relocated structure was removed must be
replanted with vegetation. Replanting shall be required as follows:
a. Trees removed in order to relocate a structure must be replanted with at least one
native tree, three (3) feet in height, for every tree removed. If more than five trees are
planted, no one species of tree shall make up more than 50% of the number of trees
planted. Replaced trees must be planted no further from the water or wetland than
the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged,
or removed must be reestablished within the setback area. The vegetation and/or
ground cover must consist of similar native vegetation and/or ground cover that was
disturbed, destroyed or removed.
b. Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees,
or a combination thereof.
4. Reconstruction or Replacement. Any non-conforming structure which is located
less than the required setback from a water body, tributary stream, or wetland and which is
removed, or damaged or destroyed, regardless of the cause, by more than 50% of the
market value of the structure before such damage, destruction or removal, may be
reconstructed or replaced provided that a permit is obtained within eighteen (18) months
of the date of said damage, destruction, or removal, and provided that such reconstruction
or replacement is in compliance with the water body, tributary stream or wetland setback
requirement to the greatest practical extent as determined by the Planning Board or its
designee in accordance with the purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its non-conformity. If the reconstructed or
replacement structure is less than the required setback it shall not be any larger than the
original structure, except as allowed pursuant to Section 12(C)(1) above, as determined by
the non-conforming footprint of the reconstructed or replaced structure at its new
location. If the total footprint of the original structure can be relocated or reconstructed
beyond the required setback area, no portion of the relocated or reconstructed structure
shall be replaced or constructed at less than the setback requirement for a new structure.
When it is necessary to remove vegetation in order to replace or reconstruct a structure,
vegetation shall be replanted in accordance with Section 12(C)(3) above.
Town of Northport Shoreland Zoning Ordinance
11
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market
value, or damaged or destroyed by 50% or less of the market value of the structure,
excluding normal maintenance and repair, may be reconstructed in place if a permit is
obtained from the Code Enforcement Officer within one year of such damage, destruction,
or removal.
In determining whether the building reconstruction or replacement meets the setback to
the greatest practical extent the Planning Board or its designee shall consider, in addition
to the criteria in Section 12(C)(3) above, the physical condition and type of foundation
present, if any.
5. Change of Use of a Non-conforming Structure. The use of a non-conforming structure
may not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources than
the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and functionally water-dependent
uses.
D. Non-conforming Uses
1. Expansions. Expansions of non-conforming uses are prohibited, except that non-
conforming residential uses may, after obtaining a permit from the Planning Board, be
expanded within existing residential structures or within expansions of such structures as
allowed in Section 12(C)(1) above.
2. Resumption Prohibited. A lot, building or structure in or on which a non-conforming
use is discontinued for a period exceeding one year, or which is superseded by a
conforming use, may not again be devoted to a non-conforming use except that the
Planning Board may, for good cause shown by the applicant, grant up to a one year
extension to that time period. This provision shall not apply to the resumption of a use of a
residential structure provided that the structure has been used or maintained for
residential purposes during the preceding five (5) year period.
3.) Change of Use. An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the
subject and adjacent properties and resources than the former use, as determined by the
Town of Northport Shoreland Zoning Ordinance
12
Planning Board. The determination of no greater adverse impact shall be made according
to criteria listed in Section 12(C)( 5) above.
E. Non-conforming Lots
1. Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance (June 29, 1992) may be built upon, without the need for a variance, provided
that such lot is in separate ownership and not contiguous with any other lot in the same
ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
2. Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance (June 29, 1992), if all or part
of the lots do not meet the dimensional requirements of this Ordinance, and if a principal
use or structure exists on each lot, the non-conforming lots may be conveyed separately or
together, provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A
through 4807-D) and the State of Maine Subsurface Wastewater Disposal Rules are
complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance (June 29, 1992), each may be sold on a separate lot provided that
the above referenced law and rules are complied with. When such lots are divided each lot
thus created must be as conforming as possible to the dimensional requirements of this
Ordinance.
3. Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are
in single or joint ownership of record at the time of or since adoption of this Ordinance
(June 29, 1992), if any of these lots do not individually meet the dimensional requirements
of this Ordinance or subsequent amendments, and if one or more of the lots are vacant or
contain no principal structure the lots shall be combined to the extent necessary to meet
the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective date of this Ordinance
and recorded in the registry of deeds if the lot is served by a public sewer or can
accommodate a subsurface sewage disposal system in conformance with the State of
Maine Subsurface Wastewater Disposal Rules; and
a. Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet
of lot area; or
Town of Northport Shoreland Zoning Ordinance
13
b. Any lots that do not meet the frontage and lot size requirements of Section
12(E)(3)(a) are reconfigured or combined so that each new lot contains at least 100 feet
of shore frontage and 20,000 square feet of lot area.
Section 13.
Establishment of Districts
A. Resource Protection District.
The Resource Protection District includes areas in which development would adversely
affect water quality, productive habitat, biological ecosystems, or scenic and natural values.
This district shall include the following areas when they occur within the limits of the
shoreland zone, exclusive of the Stream Protection District, except that areas which are
currently developed and areas which meet the criteria for the Limited Commercial or
General Development I Districts need not be included within the Resource Protection
District.
1. Areas within 250 feet, horizontal distance, of the upland edge of freshwater
wetlands and wetlands associated with great ponds and rivers, which are rated
"moderate" or "high" value waterfowl and wading bird habitat, including nesting and
feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W) that
are depicted on a Geographic Information System (GIS) data layer maintained by either
MDIF&W or the Department as of May 1, 2006. For the purposes of this paragraph
"wetlands associated with great ponds and rivers" shall mean areas characterized by
non-forested wetland vegetation and hydric soils that are contiguous with a great pond
or river, and have a surface elevation at or below the water level of the great pond or
river during the period of normal high water. "Wetlands associated with great ponds or
rivers" are considered to be part of that great pond or river.
2. Floodplains along rivers and floodplains along artificially formed great ponds along
rivers, defined by the 100 year floodplain as designated on the Federal Emergency
Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary
Maps, or the flood of record, or in the absence of these, by soil types identified as
recent floodplain soils.
3. Areas of two or more contiguous acres with sustained slopes of 20% or greater.
4. Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric
soils, which are not part of a freshwater wetland as defined, and which are not
surficially connected to a water body during the period of normal high water.
5. Land areas along rivers subject to severe bank erosion, undercutting, or river bed
movement, and lands adjacent to tidal waters which are subject to severe erosion or
mass movement, such as steep coastal bluffs.
Town of Northport Shoreland Zoning Ordinance
14
B. Marine Residential-Recreational District 1. The Marine Residential - Recreational
District 1 includes those areas suitable for residential and recreational development. It
includes areas other than those in the Resource Protection District, or Stream Protection
District.
C. Stream Protection District. The Stream Protection District includes all land areas
within seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream,
exclusive of those areas within two-hundred and fifty (250) feet, horizontal distance, of the
normal high-water line of a great pond, or river, or within two hundred and fifty (250) feet,
horizontal distance, of the upland edge of a wetland. Where a stream and its associated
shoreland area are located within two-hundred and fifty (250) feet, horizontal distance, of
the above water bodies or wetlands, that land area shall be regulated under the terms of
the shoreland district associated with that water body or wetland.
Section 14.
Table of Land Uses.
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform
with all of the applicable land use standards in Section 15. The district designation for a
particular site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes -
Allowed (no permit required but the use must comply with all applicable land use
standards)
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI -
Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -
Resource Protection
MR1- Marine Residential
SP -
Stream Protection
Town of Northport Shoreland Zoning Ordinance
15
Northport Shoreland Zoning Ordinance
- 16 -
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP MR1
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking
yes
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
yes
5.Clearing or removal of vegetation for activities other than timber
harvesting
CEO
CEO1
yes
6. Fire prevention activities
yes
yes
yes
7. Wildlife management practices
yes
yes
yes
8. Soil and water conservation practices
yes
yes
yes
9. Mineral exploration
no
yes2
yes2
10. Mineral extraction including sand and gravel extraction
no
PB3
PB
11. Surveying and resource analysis
yes
yes
yes
12. Emergency operations
yes
yes
yes
13. Agriculture
yes
PB
yes
14. Aquaculture
PB
PB
PB
15. Principal structures and uses
A. One and two family residential, including driveways
PB4
PB9
CEO
B. Multi-unit residential
no
no
PB
C. Commercial
no
no10
no10
D. Industrial
no
no
no
E. Governmental and institutional
no
no
PB
F. Small non-residential facilities for educational, scientific, or
nature interpretation purposes
PB4
PB
PB
I. Expansions of non-conforming structures
PB
PB
PB
16. Structures accessory to allowed uses
PB4
PB
CEO
17. Piers, docks, wharfs, bridges and other structures and uses
extending over or below the normal high-water line or within
a wetland
a. Temporary
b. Permanent
CEO11
PB
CEO11
PB
CEO11
PB
18. Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
19. Home occupations
PB
PB
PB
20. Private sewage disposal systems for allowed uses
LPI
no
LPI
21. Essential services
PB6
PB6
PB
A. Roadside distribution lines (34.5kV and lower)
CEO6
CEO6
yes12
B. Non-roadside or cross-country distribution lines involving ten
poles or less in the shoreland zone
PB6
PB6
CEO
C. Non-roadside or cross-country distribution lines involving
eleven or more poles in the shoreland zone
PB6
PB6
PB
D. Other essential services
PB6
PB6
PB
22. Service drops, as defined, to allowed uses
yes
yes
yes
23. Public and private recreational areas involving minimal structural
development
PB
PB
PB
24. Individual, private campsites
PB
PB
PB
25. Campgrounds
no
no7
PB
26. Road / Driveway construction
PB
no8
CEO
27. Land management roads
yes
PB
yes
28. Parking facilities
no
no
PB
Northport Shoreland Zoning Ordinance
- 17 -
29. Marinas
PB
no
PB
30. Filling and earth moving of <10 cubic yards
CEO
CEO
yes
31. Filling and earth moving of >10 cubic yards
PB
PB
CEO
32. Signs
yes
yes
yes
33. Windmills
no
no
PB
34. Uses similar to allowed uses
CEO
CEO
CEO
35. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
36. Uses similar to uses requiring a PB permit
PB
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great
ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface
area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of
Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses
only (See note on previous page).
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case
a permit is required from the PB.
8Except as provided in Section 15(H)(4).
9Single family residential structures may be allowed by special exception only according to
the provisions of Section 16(E), Special Exceptions. Two-family residential structures are
prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and
campgrounds, that are allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit
is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the
Department of Environmental Protection, pursuant to 38 M.R.S.A. section 480-C, if the
activity occurs in, on, over or adjacent to any freshwaterl wetland, great pond, river,
stream or brook and operates in such a manner that material or soil may be washed into
them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other
materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
Northport Shoreland Zoning Ordinance
- 18 -
Section 15.
Land Use Standards.
All land use activities within the shoreland zone shall conform with the following
provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot Minimum
Area (sq. ft.)
Shore
Frontage
(ft.)
1.
a. Residential per dwelling unit
1. Within the Shoreland Zone
Adjacent to Tidal Areas
60,000
200
2. Within the Shoreland Zone
Adjacent to Non-Tidal Areas
60,000
200
3. Connected to Northport Village
Corporation wastewater treatment 30,000 150
b. Governmental, Institutional, Commercial or Industrial per principal
structure
1. Within the Shoreland Zone
Adjacent to Tidal Areas, Exclusive
of Those Areas Zoned for
Commercial Fisheries and
Maritime Activities
60,000
200
2. Within the Shoreland Zone
Adjacent to Non-tidal Areas
60,000
300
c. Public and Private Recreational Facilities
1. Within the Shoreland Zone Adjacent
to Tidal and Non-Tidal Areas
60,000
200
2. Land below the normal high-water line of a water body or upland edge of a
wetland and land beneath roads serving more than two (2) lots shall not be
included toward calculating minimum lot area.
Northport Shoreland Zoning Ordinance
- 19 -
3. Lots located on opposite sides of a public or private road shall be considered
each a separate tract or parcel of land unless such road was established by the
owner of land on both sides thereof after September 22, 1971.
4. The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body or upland
edge of a wetland shall be equal to or greater than the shore frontage
requirement for a lot with the proposed use.
5. If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is
constructed or established on a single parcel, all dimensional requirements
shall be met for each additional dwelling unit, principal structure, or use.
B. Principal and Accessory Structures
1. All new principal and accessory structures shall be set back at least one hundred
(100) feet, horizontal distance, from the normal high-water line of great ponds
classified GPA and rivers that flow to great ponds classified GPA, and seventy five (
75) feet, horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland. In the Resource Protection
District the setback requirement shall be 250 feet, horizontal distance, except for
structures, roads, parking spaces or other regulated objects specifically allowed in
that district in which case the setback requirements specified above shall apply.
In addition:
a. The water body, tributary stream, or wetland setback provision shall neither
apply to structures which require direct access to the water body or wetland as
an operational necessity, such as piers, docks and retaining walls, nor to other
functionally water-dependent uses.
b. All principal structures along Significant River Segments as listed in 38 M.R.S.A.
section 437, shall be set back a minimum of one hundred and twenty-five (125)
feet, horizontal distance, from the normal high-water line and shall be screened
from the river by existing vegetation. This provision does not apply to structures
related to hydropower facilities.
c. For principal structures, water and wetland setback measurements shall be taken
from the top of a coastal bluff that has been identified on Coastal Bluff maps as
being "highly unstable" or "unstable" by the Maine Geological Survey pursuant to
its "Classification of Coastal Bluffs" and published on the most recent Coastal Bluff
map. If the applicant and the permitting official(s) are in disagreement as to the
Northport Shoreland Zoning Ordinance
- 20 -
specific location of a "highly unstable" or "unstable" bluff, or where the top of the
bluff is located, the applicant may at his or her expense, employ a Maine
Registered Professional Engineer, a Maine Certified Soil Scientist, a Maine State
Geologist, or other qualified individual to make a determination. If agreement is
still not reached, the applicant may appeal the matter to the board of appeals.
d) On a non-conforming lot of record on which only a residential structure exists,
and it is not possible to place an accessory structure meeting the required water
body, tributary stream or wetland setbacks, the code enforcement officer may
issue a permit to place a single accessory structure, with no utilities, for the storage
of yard tools and similar equipment. Such accessory structure shall not exceed
eighty (80) square feet in area nor eight (8) feet in height, and shall be located as
far from the shoreline or tributary stream as practical and shall meet all other
applicable standards, including lot coverage and vegetation clearing limitations. In
no case shall the structure be located closer to the shoreline or tributary stream
than the principal structure.
2. Principal or accessory structures and expansions of existing structures which are
permitted in the Resource Protection, Limited Residential, Limited Commercial, and
Stream Protection Districts, shall not exceed thirty-five (35) feet in height. This
provision shall not apply to structures such as transmission towers, windmills,
antennas, and similar structures having no floor area.
3. The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least one foot above the elevation of the 100 year
flood, the flood of record, or in the absence of these, the flood as defined by soil
types identified as recent flood-plain soils. In those municipalities that participate
in the National Flood Insurance Program and have adopted the April 2005 version,
or later version, of the Floodplain Management Ordinance, accessory structures
may be placed in accordance with the standards of that ordinance and need not
meet the elevation requirements of this paragraph.
4. The total footprint area of all structures, parking lots and other non-vegetated
surfaces, within the shoreland zone shall not exceed twenty (20) percent of the lot or
a portion thereof, located within the shoreland zone, including land area previously
developed
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are
not limited to the following: structures, parking areas, and other areas from which
vegetation has been removed. Naturally occurring ledge and rock outcroppings are
not counted as nonvegetated surfaces when calculating lot coverage for lots of
record on March 24, 1990 in continuous existence since that date.
Northport Shoreland Zoning Ordinance
- 21 -
5. Retaining walls that are not necessary for erosion control shall meet the structure
setback requirement, except for low retaining walls and associated fill provided all of
the following conditions are met:
a. The site has been previously altered and an effective vegetated buffer
does not exist;
b. The wall(s) is(are) at least 25 feet, horizontal distance, from the normal
high-water line of a water body, tributary stream, or upland edge of a
wetland;
c. The site where the retaining wall will be constructed is legally existing
lawn or is a site eroding from lack of naturally occurring vegetation, and
which cannot be stabilized with vegetative plantings;
d. The total height of the wall(s), in the aggregate, are no more than 24
inches;
e. Retaining walls are located outside of the 100-year floodplain on rivers,
streams, wetlands, and tributary streams, as designated on the Federal
Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or
Flood Hazard Boundary Maps, or the flood of record, or in the absence of
these, by soil types identified as recent flood plain soils.
f. The area behind the wall is revegetated with grass, shrubs, trees, or a
combination thereof, and no further structural development will occur
within the setback area, including patios and decks; and
g. A vegetated buffer area is established within 25 feet, horizontal distance,
of the normal high-water line of a water body, tributary stream, or upland
edge of a wetland when a natural buffer area does not exist. The buffer
area must meet the following characteristics:
(i) The buffer must include shrubs and other woody and herbaceous
vegetation. Where natural ground cover is lacking the area must be
supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion
and provide for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
Northport Shoreland Zoning Ordinance
- 22 -
(iv) A minimum buffer width of 15 feet, horizontal distance, is required,
measured perpendicularly to the normal high-water line or upland
edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may
traverse the buffer;
6. Notwithstanding the requirements stated above, stairways or similar structures
may be allowed with a permit from the Code Enforcement Officer, to provide
shoreline access in areas of steep slopes or unstable soils provided: that the
structure is limited to a maximum of four (4) feet in width; that the structure
does not extend below or over the normal high-water line of a water body or
upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, 38
M.R.S.A. section 480-C); and that the applicant demonstrates that no
reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending
Over or Below the Normal High-Water Line of a Water Body or Within a
Wetland,and Shoreland Stabilization.
1. No more than one pier, dock, wharf or similar structure extending or located
below the normal high-water line of a water body or within a wetland is allowed
on a single lot; except that when a single lot contains at least twice the minimum
shore frontage as specified in Section 15(A), a second structure may be allowed
and remain as long as the lot is not futher divided.
2. Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
3. The location shall not interfere with existing developed or natural beach areas.
4. The facility shall be located so as to minimize adverse effects on fisheries.
5. The facility shall be no larger in dimension than necessary to carry on the activity
and be consistent with the surrounding character and uses of the area. A temporary
pier, dock or wharf shall not be wider than six feet for non-commercial uses.
6. No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending beyond the normal high-water line of a water body or within a
wetland unless the structure requires direct access to the water body or wetland as
an operational necessity.
Northport Shoreland Zoning Ordinance
- 23 -
7. New permanent piers and docks shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible,
and a permit has been obtained from the Department of Environmental Protection,
pursuant to the Natural Resources Protection Act.
8. No existing structures built on, over or abutting a pier, dock, wharf or other
structure extending beyond the normal high-water line of a water body or within a
wetland shall be converted to residential dwelling units in any district.
9. Except in the General Development Districts, structures built on, over or abutting
a pier, wharf, dock or other structure extending beyond the normal high-water line
of a water body or within a wetland shall not exceed twenty (20) feet in height above
the pier, wharf, dock or other structure.
10. Vegetation may be removed in excess of the standards in Section 15(P) of this
ordinance in order to conduct shoreline stabilization of an eroding shoreline,
provided that a permit is obtained from the Planning Board. Construction equipment
must access the shoreline by barge when feasible as determined by the Planning
Board.
a. When necessary, the removal of tress and other vegetation to allow for
construction equipment access to the stabilization site via land must be
limited to no more than 12 feet in width. When the stabilization project is
complete the construction equipment accessway must be restored.
b. Revegetation must occur in accordance with Section 15(S).
D. Campgrounds.
Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of
land, not including roads and driveways, for each site. Land supporting wetland
vegetation, and land below the normal high-water line of a water body shall not be
included in calculating land area per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and
utility and service buildings shall be set back a minimum of one hundred (100) feet,
horizontal distance, from the normal high-water line of a great pond classified GPA
or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland.
Northport Shoreland Zoning Ordinance
- 24 -
E. Individual Private Campsites.
Individual private campsites not associated with campgrounds are allowed provided the
following conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or thirty
thousand (30,000) square feet of lot area within the shoreland zone, whichever is
less, may be permitted.
2. When an individual private campsite is proposed on a lot that contains another
principal use and/or structure, the lot must contain the minimum lot dimensional
requirements for the principal structure and/or use, and the individual private
campsite separately.
3. Campsite placement on any lot, including the area intended for a recreational
vehicle or tent platform, shall be set back one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA or river
flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies, tributary streams,
or the upland edge of a wetland.
4. Only one recreational vehicle shall be allowed on a campsite. The recreational
vehicle shall not be located on any type of permanent foundation except for a gravel
pad, and no structure except a canopy shall be attached to the recreational vehicle.
5. The clearing of vegetation for the siting of the recreational vehicle, tent or similar
shelter in a Resource Protection District shall be limited to one thousand (1000)
square feet.
6. A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by the
Local Plumbing Inspector. Where disposal is off-site, written authorization from the
receiving facility or land owner is required.
7. When a recreational vehicle, tent or similar shelter is placed on-site for more
than one hundred and twenty (120) days per year, all requirements for residential
structures shall be met, including the installation of a subsurface sewage disposal
system in compliance with the State of Maine Subsurface Wastewater Disposal Rules
unless served by public sewage facilities.
F. Commercial and Industrial Uses.
The following new commercial and industrial uses are prohibited within the shoreland
zone adjacent to great ponds classified GPA, and rivers and streams which flow to great
ponds classified GPA:
Northport Shoreland Zoning Ordinance
- 25 -
1. Auto washing facilities
2. Auto or other vehicle service and/or repair operations, including body shops
3. Chemical and bacteriological laboratories
4. Storage of chemicals, including herbicides, pesticides or fertilizers, other than
amounts normally associated with individual households or farms
5. Commercial painting, wood preserving, and furniture stripping
6. Dry cleaning establishments
7. Electronic circuit assembly
8. Laundromats, unless connected to a sanitary sewer
9. Metal plating, finishing, or polishing
10. Petroleum or petroleum product storage and/or sale except storage on same
property as use occurs and except for storage and sales associated with marinas
11. Photographic processing
12. Printing
G. Parking Areas
1. Parking areas shall meet the shoreline and tributary stream setback requirements
for structures for the district in which such areas are located, except that in the
Commercial Fisheries/Maritime Activities District parking areas shall be set back at
least twenty-five (25) feet, horizontal distance, from the shoreline. The setback
requirement for parking areas serving public boat launching facilities in Districts
other than the General Development I District and Commercial Fisheries/Maritime
Activities District shall be no less than fifty (50) feet, horizontal distance, from the
shoreline or tributary stream if the Planning Board finds that no other reasonable
alternative exists further from the shoreline or tributary stream.
Northport Shoreland Zoning Ordinance
- 26 -
2. Parking areas shall be adequately sized for the proposed use and shall be
designed to prevent stormwater runoff from flowing directly into a water body,
tributary stream or wetland and where feasible, to retain all runoff on-site.
3. In determining the appropriate size of proposed parking facilities, the following
shall apply:
a. Typical parking space: Approximately ten (10) feet wide and twenty (20) feet
long, except that parking spaces for a vehicle and boat trailer shall be forty (40)
feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways.
The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
1. Roads and driveways shall be set back at least one-hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA or a river
that flows to a great pond classified GPA, and seventy-five (75) feet, horizontal
distance from the normal high-water line of other water bodies, tributary streams, or
the upland edge of a wetland unless no reasonable alternative exists as determined
by the Planning Board. If no other reasonable alternative exists, the road and/or
driveway setback requirement shall be no less than fifty (50) feet, horizontal
distance, upon clear showing by the applicant that appropriate techniques will be
used to prevent sedimentation of the water body, tributary stream, or wetland.
Such techniques may include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief culverts and turnouts placed
so as to avoid sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall
be increased by ten (10) feet, horizontal distance, for each five (5) percent increase
in slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures and facilities located nearer to
the shoreline or tributary stream due to an operational necessity, excluding
temporary docks for recreational uses. Roads and driveways providing access to
permitted structures within the setback area shall comply fully with the
requirements of Section 15(H)(1) except for that portion of the road or driveway
necessary for direct access to the structure.
Northport Shoreland Zoning Ordinance
- 27 -
2. Existing public roads may be expanded within the legal road right of way
regardless of their setback from a water body, tributary stream or wetland.
3. New permanent roads are not allowed within the shoreland zone along
Significant River Segments except:
a. To provide access to structures or facilities within the zone; or
b. When the applicant demonstrates that no reasonable alternative route exists
outside the shoreland zone. When roads must be located within the shoreland
zone they shall be set back as far as practicable from the normal high-water line
and screened from the river by existing vegetation.
4. New roads and driveways are prohibited in a Resource Protection District except
that the Planning Board may grant a permit to construct a road or driveway to
provide access to permitted uses within the district. A road or driveway may also be
approved by the Planning Board in a Resource Protection District, upon a finding that
no reasonable alternative route or location is available outside the district. When a
road or driveway is permitted in a Resource Protection District the road and/or
driveway shall be set back as far as practicable from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland.
5. Road and driveway banks shall be no steeper than a slope of two (2) horizontal to
one (1) vertical, and shall be graded and stabilized in accordance with the provisions
for erosion and sedimentation control contained in Section 15(T).
6. Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
7. In order to prevent road and driveway surface drainage from directly entering
water bodies, tributary streams or wetlands, roads and driveways shall be designed,
constructed, and maintained to empty onto an unscarified buffer strip at least (50)
feet plus two times the average slope, in width between the outflow point of the
ditch or culvert and the normal high-water line of a water body, tributary stream, or
upland edge of a wetland. Surface drainage which is directed to an unscarified buffer
strip shall be diffused or spread out to promote infiltration of the runoff and to
minimize channelized flow of the drainage through the buffer strip.
8. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified buffer strips
before the flow gains sufficient volume or head to erode the road, driveway, or ditch.
To accomplish this, the following shall apply:
Northport Shoreland Zoning Ordinance
- 28 -
a. Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road, or driveway at intervals no greater than indicated in the
following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
b. Drainage dips may be used in place of ditch relief culverts only where the
grade is ten (10) percent or less.
c. On sections having slopes greater than ten (10) percent, ditch relief culverts
shall be placed at approximately a thirty (30) degree angle down slope from a line
perpendicular to the centerline of the road or driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order
to allow for effective functioning, and their inlet and outlet ends shall be
stabilized with appropriate materials.
9. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained on a
regular basis to assure effective functioning.
I. Signs.
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Marine Residential-Recreational Districts:
1. Signs relating to goods and services sold on the premises shall be allowed,
provided that such signs shall not exceed six (6) square feet in area and shall not
exceed two (2) signs per premises. In the Limited Commercial District, however, such
signs shall not exceed sixteen (16) square feet in area. Signs relating to goods or
services not sold or rendered on the premises shall be prohibited.
2. Name signs are allowed, provided such signs shall not exceed two (2) signs per
premises, and shall not exceed twelve (12) square feet in the aggregate.
Northport Shoreland Zoning Ordinance
- 29 -
3. Residential users may display a single sign not over three (3) square feet in area
relating to the sale, rental, or lease of the premises.
4. Signs relating to trespassing and hunting shall be allowed without restriction as
to number provided that no such sign shall exceed two (2) square feet in area.
5. Signs relating to public safety shall be allowed without restriction.
6. No sign shall extend higher than twenty (20) feet above the ground.
7. Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
1. All new construction and development shall be designed to minimize storm water
runoff from the site in excess of the natural predevelopment conditions. Where
possible, existing natural runoff control features, such as berms, swales, terraces and
wooded areas, shall be retained in order to reduce runoff and encourage infiltration
of stormwaters.
2. Storm water runoff control systems shall be maintained as necessary to ensure
proper functioning.
K. Septic Waste Disposal
1. All subsurface sewage disposal systems shall be installed in conformance with the
State of Maine Subsurface Wastewater Disposal Rules, and the following:
a)
clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet,
horizontal distance, from the normal high-water line of a water body or the upland
edge of a wetland and b) a holding tank is not allowed for a first-time residential use
in the shoreland zone.
L. Essential Services
1. Where feasible, the installation of essential services shall be limited to existing
public ways and existing service corridors.
2. The installation of essential services, other than road-side distribution lines, is not
allowed in a Resource Protection or Stream Protection District, except to provide
services to a permitted use within said district, or except where the applicant
Northport Shoreland Zoning Ordinance
- 30 -
demonstrates that no reasonable alternative exists. Where allowed, such structures
and facilities shall be located so as to minimize any adverse impacts on surrounding
uses and resources, including visual impacts.
3. Damaged or destroyed public utility transmission and distribution lines, towers
and related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction.
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit
from the Code Enforcement Officer shall be required for mineral exploration which
exceeds the above limitation. All excavations, including test pits and holes, shall be
immediately capped, filled or secured by other equally effective measures to restore
disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
1. A reclamation plan shall be filed with, and approved, by the Planning Board
before a permit is granted. Such plan shall describe in detail procedures to be
undertaken to fulfill the requirements of Section 15 (M)(4) below.
2. No part of any extraction operation, including drainage and runoff control
features, shall be permitted within one hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and within seventy-five (75) feet, horizontal distance, of the
normal high-water line of any other water body, tributary stream, or the upland edge
of a wetland. Extraction operations shall not be permitted within fifty (50) feet,
horizontal distance, of any property line without written permission of the owner of
such adjacent property.
3. Developers of new gravel pits along Significant River Segments shall demonstrate
that no reasonable mining site outside the shoreland zone exists. When gravel pits
must be located within the zone, they shall be set back as far as practicable from the
normal high-water line and no less than seventy-five (75) feet and screened from the
river by existing vegetation.
4. Within twelve (12) months following the completion of extraction operations at
any extraction site, which operations shall be deemed complete when less than one
hundred (100) cubic yards of materials are removed in any consecutive twelve (12)
Northport Shoreland Zoning Ordinance
- 31 -
month period, ground levels and grades shall be established in accordance with the
following:
a. All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated on-site
may be buried or covered on-site.
b. The final graded slope shall be two and one-half to one (2 1/2:1) slope or
flatter.
c. Top soil or loam shall be retained to cover all disturbed land areas, which
shall be reseeded and stabilized with vegetation native to the area. Additional
topsoil or loam shall be obtained from off-site sources if necessary to complete
the stabilization project.
5. In keeping with the purposes of this Ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated with
mineral extraction operations on surrounding uses and resources.
N. Agriculture
1. All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the former Maine Department of Agriculture on
November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-
4209).
2. Manure shall not be stored or stockpiled within one hundred (100) feet,
horizontal distance, of a great pond classified GPA or a river flowing to a great pond
classified GPA, or within seventy-five (75) feet horizontal distance, of other water
bodies, tributary streams, or wetlands. All manure storage areas within the
shoreland zone must be constructed or modified such that the facility produces no
discharge of effluent or contaminated storm water.
3. Agricultural activities involving tillage of soil greater than forty thousand (40,000)
square feet in surface area, within the shoreland zone shall require a Conservation
Plan to be filed with the Planning Board. Non-conformance with the provisions of
said plan shall be considered to be a violation of this Ordinance.
4. There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA; within
seventy-five (75) feet, horizontal distance, from other water bodies; nor within
Northport Shoreland Zoning Ordinance
- 32 -
twenty-five (25) feet, horizontal distance, of tributary streams and wetlands.
Operations in existence on the effective date of this ordinance and not in
conformance with this provision may be maintained.
5. Newly established livestock grazing areas shall not be permitted within one
hundred (100) feet, horizontal distance, of the normal high-water line of a great
pond classified GPA; within seventy-five (75) feet, horizontal distance, of other water
bodies; nor within twenty-five (25) feet, horizontal distance, of tributary streams and
wetlands. Livestock grazing associated with ongoing farm activities, and which are
not in conformance with the above setback provisions may continue, provided that
such grazing is conducted in accordance with a Conservation Plan that has been filed
with the Planning Board.
O. Repealed
P. Clearing or Removal of Vegetation for Activities Other Than Timber
Harvesting
1. In a Resource Protection District abutting a great pond, there shall be no cutting
of vegetation within the strip of land extending 75 feet, horizontal distance, inland
from the normal high-water line, except to remove hazard treesas described in
Section Q..
Elsewhere, in any Resource Protection District the cutting or removal of vegetation
shall be limited to that which is necessary for uses expressly authorized in that
district.
2. Except in areas as described in Section P(1), within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water line of a
great pond classified GPA or a river flowing to a great pond classified GPA, or within a
strip extending seventy-five (75) feet, horizontal distance, from any other water
body, tributary stream, or the upland edge of a wetland, a buffer strip of vegetation
shall be preserved as follows:
a. There shall be no cleared opening greater than 250 square feet in the forest
canopy (or other existing woody vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown. However, a single
Northport Shoreland Zoning Ordinance
- 33 -
footpath not to exceed six (6) feet in width as measured between tree trunks
and/or shrub stems is allowed for accessing the shoreline provided that a cleared
line of sight to the water through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is allowed provided that a
well-distributed stand of trees and other natural vegetation is maintained. For
the purposes of Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to
a great pond classified GPA or a river or stream flowing to a great pond classified
GPA, shall be defined as maintaining a rating score of 24 or more in each 25-foot
by 50-foot rectangular (1250 square feet) area as determined by the following
rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - < 4 in.
1
4 - <8 in.
2
8- < 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed
stand of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by
50-foot rectangular area..
The following shall govern in applying this point system:
I.
The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
II.
Each successive plot must be adjacent to, but not overlap a previous plot;
III.
Any plot not containing the required points must have no vegetation
removed except as otherwise allowed by this Ordinance;
IV.
Any plot containing the required points may have vegetation removed
down to the minimum points required or as otherwise allowed by is
Ordinance;
V.
Where conditions permit, no more than 50% of the points on any 25-foot
by 50-foot rectangular area may consist of trees greater than 12 inches in
diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as
retaining existing vegetation under three (3) feet in height and other ground cover
and retaining at least five (5) saplings less than two (2) inches in diameter at four
Northport Shoreland Zoning Ordinance
- 34 -
and one half (4 ½) feet above ground level for each 25-foot by 50-foot rectangle
area. If five saplings do not exist, no woody stems less than two (2) inches in
diameter can be removed until 5 saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
c. In order to protect water quality and wildlife habitat, existing vegetation under
three (3) feet in height and other ground cover, including leaf litter and the forest
duff layer, shall not be cut, covered, or removed, except to provide for a footpath or
other permitted uses as described in Section 15(P) paragraphs (2) and (2)(a) above.
d Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
e. In order to maintain a buffer strip of vegetation, when the removal of storm-
damaged, dead or hazard trees results in the creation of cleared openings, these
openings shall be replanted with native tree species in accordance Section Q
below,unless existing new tree growth is present.
f. In order to maintain a buffer strip of vegetation, clearing or vegetation removal for
permitted construction activities within or beyond the buffer strip must comply with
the requirements of Section 15(P)(2). Note: In some cases, construction limitations
may result in a new structure being located futher from the shoreline than the
minimum setback requirements.
3. At distances greater than one hundred (100) feet, horizontal distance, from a
great pond classified GPA or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of any
other water body, tributary stream, or the upland edge of a wetland, there shall be
allowed on any lot, in any ten (10) year period, selective cutting of not more than
forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured 4 1/2 feet above ground level. Tree removal in conjunction with the
development of permitted uses shall be included in the forty (40) percent
calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed in the aggregate, 25% of the lot area within the shoreland zone or ten
thousand (10,000) square feet, whichever is greater, including land previously
cleared. This provision applies to the portion of a lot within the shoreland zone,
Northport Shoreland Zoning Ordinance
- 35 -
including the buffer area.4. Legally existing nonconforming cleared openings may
be maintained, but shall not be enlarged, except as allowed by this Ordinance.
5. Fields and other cleared openings which have reverted to primarily shrubs, trees,
or other woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
1. Hazard trees in the shoreland zone may be removed without a permit after
consulation with the Code Enforcement Officer if the following requirements are
met:
a. Within the shoreline buffer, if the removal of a hazard tree results in a
cleared opening in the tree canopy greater than two hundred and fifty
(250) square feet, replacement with native tree species is required, unless
ther is new tree growth already present. New tree growth must be as near
as practicable to where the hazard tree was removed and be at least two
(2) inches in diameter, measured at four and one half (4.5) feet above the
ground level. If new growth is not present, then replacement trees shall
consist of native species and be at least four (4) feet in height, and be no
less than two (2) inches in diameter. Stumps may not be removed.
b. Outside of the shoreline buffer, when the removal of hazard tress ezceed
forty (40) percent of the volume of trees four (4) inches or more in
diameter, measured at four and one half (4.5) feet above ground level in
any ten year period, and/or results in cleared openings exceeding twenty-
five (25) percent of the lot area within the shoreland zone, or ten thousand
(10,000) square feet, whichever is greater, replacement with native tree
species is required, unless there is new tree growth alreaty present. New
tree growth must be as near as practicable to where the hazard tree was
removed and be at least two (2) inches in diameter, measured at four and
one half (4.5) above the ground level. If new growth is not present, then
trees shall consist of native species and be at least two (2) inches in
diameter, measured at four and one half (4.5) above the ground level.
c. The removal of standing dead trees, resulting from natural causes, is
permissible without the need for replanting or a permit, as long as the
removal does not result in the creation of new lawn areas, or other
permanently clear areas, and stumps are not removed. For purposes of
Northport Shoreland Zoning Ordinance
- 36 -
this provision dead trees are those trees that contain no foliage during the
growing season.
d. The Code Enforcement Officer may require the property owner to submit
an evaluation from a licensed forester or arborist before any hazard tree
can be removed within the shoreland zone.
e. The Code Enforcement Officer may require more than a one-for-one
replacement for hazard tress removed that exceed eight (8) inches in
diameter at four and one half (4.5) feet above ground level.
2. Storm-damaged trees in the shoreland zone may be removed without a permit
after consulation with the Code Enforcement Officer if the following requirements
are met:
a. Within the shoreline buffer, when the removal of storm-damaged trees
results in a cleared opening in the tree canopy greater than two hundred
and fifty (250) square feet, replanting is not required, but the area shall be
required to naturally revegetate, and the following requirements must be
met:
i.The area from which a storm-damaged tree is removed does not
result in new lawn areas, or other permanently cleared areas;
ii. Stumps from the storm-damaged tress may not be removed;
iii. Limbs damaged from a storm event may be pruned even if they
extend beyond the bottom one-third (1/3) of the tree; and
iv. If after one growing season, no natural regeneration or regrowth
is present, replanting of native seedlings or saplings is required at a
density of one seedling per every eighty (80) square feet of lost
canopy.
b. Outside of the shoreline buffer, if the removal of storm damaged trees
exceeds 40% of the volume of trees four (4) inches or more in diameter,
measured at four and one half (4.5) above the ground level in any ten (10)
year period, or results, in the aggregate, in cleared openings exceeding
25% of the lot area within the shoreland zone or ten thousand (10,000)
square feet, whichever is greater, and no natural regeneration occurs
within one growing season, then native tree seedlings or saplings shall be
replanted on a one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
Northport Shoreland Zoning Ordinance
- 37 -
The following activites are exempt from the clearing and vegetation removal
standards set forth in Section 15(P), provided that all other applicable requirements
of this chapter are complied with, and the removal of vegetation is limited to which
is necessary:
1. The removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the vegetation
standards in this chapter, such as but not limited to cleared openings in the
canopy or fields. Such areas shall not be enlarged, except as allowed by this
section. If any or these areas, due to lack of removal of vegetation every two (2)
years, reverts back to primary woody vegetation, the requirements of Section
15(P) apply;
2. The removal of vegetation from the location of allowed structures or allowed
uses, when the shoreland setback requirements of Section 15 (B) are not
applicable;
3. The removal of vegetation from the location of public swimming areas
associated with an allowed public recreational facility;
4. The removal of vegetation associated with allowed agricultural uses, provided
best management practices are utilized, and provided all requirements of
Section 15(N) are complied with;
5. The removal of vegetation associated with brownfields or voluntary response
action program (VRAP) projects provided that the removal of vegetation is
necessary for remediation activities to clean-up contaimination on a site in a
general development district, commercial fisheries and maritime activities
district or other equivalent zoning district approved by the Commissioner that
is part of a state of federal brownfields program or a voluntary response action
program pursuant 38 M.R.S.A Section 343-E, and that is located along:
a. A coastal wetland; or
b. A river that does not flow to a great pond classified as GPA pursuant to 38
M.R.S.A. Section 465-A.
6. The removal of non-native invasive vegetation species, provided the following
minimum requirements are met;
a. If removal of vegetation occurs via wheeled or tracked motorized equipment,
the wheeled or tracked motorized equipment is operated and stored at least
twenty-five (25) feet, horizontal distance, from the shoreline, except that
Northport Shoreland Zoning Ordinance
- 38 -
wheeled or tracked equipment may be operated or stored on existing
structural surfaces, such as pavement or gravel;
b. Removal of vegetation within twenty-five (25) feet, horizontal distance, from
the shoreline occurs via hand tools; and
c. If applicable clearing and vegetation removal standards are exceeded due to
the removal of non-native invasive species vegetation, the area shall be
revegetated with native species to achieve compliance.
7. The removal of vegetation associated with emergency respose activities
conducted by the Department, the U.S. Environmental Protection Agency, the
U.S. Coast Guard, and their agents.
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation
standards set forth in Section 15(P), to address the removal of non-native invasive
species of vegetation, or as a mechanism to allow for development that may
otherwise not be permissible due to the vegetation standards, including removal of
vegetation in conjunction with a shoreline stabilization project, the revegetation
must comply with the following requirements:
1. The property owner must submit a revegetation plan, prepared with and
signed by a qualified professional, that describes revegetation activities and
maintenance. The plan must include a scaled site plan, depicting where
vegetation was, or is to be removed, where existing vegetation is to remain,
and where vegetation is to be planted, including a list of all vegetation to be
planted.
2. Revegetation must occur along same segment of shoreline and in the same
area where vegetation was removed and at a density comparable to the pre-
existing vegetation, except where a shoreline stabilization activity does not
allow revegetation to occur in the same area and at a density comparable to
the pre-existing vegetation, in which case revegetation must occur along same
segment of shoreline and as close as possible to area where vegetation was
removed.
3. If part of a permitted activity, revegetation shall occur before the expiration of
the permit. If the activity or revegetation is not completed before the
expiration of the permit, a new revegetation plan shall be submitted with any
renewal or new permit application.
Northport Shoreland Zoning Ordinance
- 39 -
4. Revegetation activities must meet the following requirements for trees and
saplings:
a. All trees and sapling removed must be replaced with native non-invasive
species;
b. Replacement vegetation must at a minimum consist of saplings;
c. If more than three (3) trees or saplings are planted, then at least three (3)
different species shall be used;
d. No one species shall make up 50% or more of the number of trees and
saplings planted;
e. If revegetation is required for a shoreline stabilization project, and it is not
possible to plant trees and saplings in the same area where trees or saplings
were removed, then trees or saplings must be planted in a location that
effectively reestablishes the screening between the shoreline and structures;
and
f. A survival rate of a least eighty (80) percent of planted trees or saplings is
required for a minimum five (5) year period.
5. Revegetation activities must meet the following requirements for woody
vegetation and other vegetation under three (3) feet in height:
a. All woody vegetation and vegetation under three (3) feet in height must be
replaced with native non-invasive species of woody vegetation and vegetation
under three (3) feet in height as applicable;
b. Woody vegetation and vegetation under three (3) feet in height shall be
planted in quanties and variety sufficient to prevent ersion and provide for
effective infiltration of stormwater;
c. If more than three (3) woody vegetation plants are to be planted, then at
least three (3) different species shall be planted;
d. No one species shall make up 50% or more of the number of planted woody
vegetation plants; and
e. Survival of planted woody vegetation and vegetation under three feet in
height must be sufficient to remain in compliance with the standards
contained within this chapter for minimum of five (5) years.
Northport Shoreland Zoning Ordinance
- 40 -
6. Revegetation activities must meet the following requirements for ground
vegetation and ground cover:
a. All ground vegetation and ground cover removed must be replaced with
native herbaceous vegetation, in quantities and variety sufficient to prevent
erosion and provide for effective infiltration of stormwater;
b. Where necessary due to lack of sufficient ground cover, an area must be
supplemented with a minimum four (4) inch depth of leaf mulch and/or bark
mulch to prevent erosion and provide for effective infiltration of stormwater;
and
c. Survival and functionality of ground vegetation and ground cover must be
sufficient to remain in compliance with standards contained within this
chapter for minimum of five (5) years.
T. Erosion and Sedimentation Control
1. All activities which involve filling, grading, excavation or other similar activities
which result in unstabilized soil conditions and which require a permit shall also
require a written soil erosion and sedimentation control plan. The plan shall be
submitted to the permitting authority for approval and shall include, where
applicable, provisions for:
a. Mulching and revegetation of disturbed soil.
b. Temporary runoff control features such as hay bales, silt fencing or diversion
ditches.
c. Permanent stabilization structures such as retaining walls or rip-rap.
2. In order to create the least potential for erosion, development shall be designed
to fit with the topography and soils of the site. Areas of steep slopes where high cuts
and fills may be required shall be avoided wherever possible, and natural contours
shall be followed as closely as possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
stages of the activity. The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
Northport Shoreland Zoning Ordinance
- 41 -
4. Any exposed ground area shall be temporarily or permanently stabilized within
one (1) week from the time it was last actively worked, by use of riprap, sod, seed,
and mulch, or other effective measures. In all cases permanent stabilization shall
occur within nine (9) months of the initial date of exposure. In addition:
a. Where mulch is used, it shall be applied at a rate of at least one (1) bale per
five hundred (500) square feet and shall be maintained until a catch of vegetation
is established.
b. Anchoring the mulch with netting, peg and twine or other suitable method
may be required to maintain the mulch cover.
c. Additional measures shall be taken where necessary in order to avoid siltation
into the water. Such measures may include the use of staked hay bales and/or
silt fences.
5. Natural and man-made drainage ways and drainage outlets shall be protected
from erosion from water flowing through them. Drainageways shall be designed and
constructed in order to carry water from a twenty five (25) year storm or greater,
and shall be stabilized with vegetation or lined with riprap.
U. Soils.
All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts,
including severe erosion, mass soil movement, improper drainage, and water pollution,
whether during or after construction. Proposed uses requiring subsurface waste
disposal, and commercial or industrial development and other similar intensive land
uses, shall require a soils report based on an on-site investigation and be prepared by
state-certified professionals. Certified persons may include Maine Certified Soil
Scientists, Maine Registered Professional Engineers, Maine State Certified Geologists and
other persons who have training and experience in the recognition and evaluation of soil
properties. The report shall be based upon the analysis of the characteristics of the soil
and surrounding land and water areas, maximum ground water elevation, presence of
ledge, drainage conditions, and other pertinent data which the evaluator deems
appropriate. The soils report shall include recommendations for a proposed use to
counteract soil limitations where they exist.
V. Water Quality.
No activity shall deposit on or into the ground or discharge to the waters of the State
any pollutant that, by itself or in combination with other activities or substances, will
Northport Shoreland Zoning Ordinance
- 42 -
impair designated uses or the water classification of the water body, tributary stream or
wetland.
W. Archaeological Site.
Any proposed land use activity involving structural development or soil disturbance on
or adjacent to sites listed on, or eligible to be listed on the National Register of Historic
Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty
(20) days prior to action being taken by the permitting authority. The permitting
authority shall consider comments received from the Commission prior to rendering a
decision on the application.
Section 16.
Administration
A. Administering Bodies and Agents
1. Code Enforcement Officer. A Code Enforcement Officer shall be appointed or
reappointed annually by July 1st.
2 Board of Appeals. A Board of Appeals shall be created in accordance with the
provisions of 30-A M.R.S.A. section 2691.
3. Planning Board. A Planning Board shall be created in accordance with the
provisions of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without
first obtaining a permit, engage in any activity or use of land or structure requiring a
permit in the district in which such activity or use would occur; or expand, change, or
replace an existing use or structure; or renew a discontinued nonconforming use. A
person who is issued a permit pursuant to this Ordinance shall have a copy of the
permit on site while the work authorized by the permit is performed.
1. A permit is not required for the replacement of an existing road culvert as long
as:
a. The replacement culvert is not more than 25% longer than the culvert
being replaced;
b. The replacement culvert is not longer than 75 feet; and
c. Adequate erosion control measures are taken to prevent sedimentation
of the water, and the crossing does not block fish passage in the watercourse.
Northport Shoreland Zoning Ordinance
- 43 -
2. A permit is not required for an archaeological excavation as long as the
excavation is conducted by an archaeologist listed on the State Historic
Preservation Officer's level 1 or level 2 approved list, and unreasonable erosion
and sedimentation is prevented by means of adequate and timely temporary and
permanent stabilization measures.
3. Any permit required by this Ordinance shall be in addition to any other
permit required by other law or ordinance.
C. Permit Application
1. Every applicant for a permit shall submit a written application, including a
scaled site plan, on a form provided by the municipality, to the appropriate
official as indicated in Section 14.
2. All applications shall be signed by an owner or individual who can show
evidence of right, title or interest in the property or by an agent, representative,
tenant, or contractor of the owner with authorization from the owner to apply
for a permit hereunder, certifying that the information in the application is
complete and correct.
3. All applications shall be dated, and the Code Enforcement Officer or Planning
Board, as appropriate, shall note upon each application the date and time of its
receipt.
4. If the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation
approved by the Plumbing Inspector, shall be submitted whenever the nature of
the proposed structure or use would require the installation of a subsurface
sewage disposal system.
5. The applicant is required to provide to the municipal permitting authority
preconstruction photographs and, no later than 20 days after completion of the
development, postconstruction photographs of the shorelinevegetation and
development site. (Pursuant to 38 M.R.S. ss439-A(10))
D. Procedure for Administering Permits. Within 35 days of the date of receiving a
written application, the Planning Board or Code Enforcement Officer, as indicated in
Section 14, shall notify the applicant in writing either that the application is a
complete application, or, if the application is incomplete, that specified additional
material is needed to make the application complete. The Planning Board or the
Code Enforcement Officer, as appropriate, shall approve, approve with conditions, or
deny all permit applications in writing within 35 days of receiving a completed
application. However, if the Planning Board has a waiting list of applications, a
Northport Shoreland Zoning Ordinance
- 44 -
decision on the application shall occur within 35 days after the first available date on
the Planning Board's agenda following receipt of the completed application, or
within 35 days of the public hearing, if the proposed use or structure is found to be
in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use
activity is in conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board
shall approve an application or approve it with conditions if it makes a positive
finding based on the information presented that the proposed use:
1. Will maintain safe and healthful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface
waters;
3. Will adequately provide for the disposal of all wastewater;
4 Will not have an adverse impact on spawning grounds, fish, aquatic life, bird
or other wildlife habitat;
5. Will conserve shore cover and visual, as well as actual, points of access to
inland waters;
6. Will protect archaeological and historic resources as designated in the
comprehensive plan;
7. Will avoid problems associated with floodplain development and use; and
8. Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as
conditions shall be stated in writing. No approval shall be granted for an application
involving a structure if the structure would be located in an unapproved subdivision or
would violate any other local ordinance, or regulation or statute administered by the
municipality.
E.
Special Exceptions. In addition to the criteria specified in Section 16(D) above,
excepting structure setback requirements, the Planning Board may approve a permit
for a single family residential structure in a Resource Protection District provided
that the applicant demonstrates that all of the following conditions are met:
Northport Shoreland Zoning Ordinance
- 45 -
1. There is no location on the property, other than a location within the
Resource Protection District, where the structure can be built.
2. The lot on which the structure is proposed is undeveloped and was
established and recorded in the registry of deeds of the county in which the lot is
located before the adoption of the Resource Protection District.
3. All proposed buildings, sewage disposal systems and other improvements are:
a. Located on natural ground slopes of less than 20%; and
b. Located outside the floodway of the 100-year flood-plain along rivers and
artificially formed great ponds along rivers, based on detailed flood insurance
studies and as delineated on the Federal Emergency Management Agency's
Flood Boundary and Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at least one foot above the 100-
year flood-plain elevation; and the development is otherwise in compliance
with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency
Maps, it is deemed to be 1/2 the width of the 100-year flood-plain.
4. The total footprint, including cantilevered or similar overhanging extensions,
of all principal and accessory structures is limited to a maximum of 1,500 square
feet. This limitation shall not be altered by variance.
5. All structures, except functionally water-dependent structures, are set back
from the normal high-water line of a water body, tributary stream or upland edge
of a wetland to the greatest practical extent, but not less than 75 feet, horizontal
distance. In determining the greatest practical extent, the Planning Board shall
consider the depth of the lot, the slope of the land, the potential for soil erosion,
the type and amount of vegetation to be removed, the proposed building site's
elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a
substantial start is not made in construction or in the use of the property during that
period. If a substantial start is made within one year of the issuance of the permit,
the applicant shall have one additional year to complete the project, at which time
the permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary
district or any utility company of any kind may not install services to any new
structure located in the shoreland zone unless written authorization attesting to the
Northport Shoreland Zoning Ordinance
- 46 -
validity and currency of all local permits required under this or any previous
Ordinance has been issued by the appropriate municipal officials or other written
arrangements have been made between the municipal officials and the utility.
H. Appeals
1. Powers and Duties of the Board of Appeals. The Board of Appeals shall have
the following powers:
a. Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error
in any order, requirement, decision, or determination made by, or failure to
act by, the Planning Board in the administration of this Ordinance; and to
hear and decide administrative appeals on a de novo basis where it is alleged
by an aggrieved party that there is an error in any order, requirement,
decision or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application
under this Ordinance. Any order, requirement, decision or determination
made, or failure to act, in the enforcement of this ordinance is not appealable
to the Board of Appeals.
b. Variance Appeals: To authorize variances upon appeal, within the
limitations set forth in this Ordinance.
2. Variance Appeals. Variances may be granted only under the following
conditions:
a. Variances may be granted only from dimensional requirements including,
but not limited to, lot width, structure height, percent of lot coverage, and
setback requirements.
b. Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
c. The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section
15 except for the specific provision which has created the non-conformity
and from which relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in
undue hardship. The term "undue hardship" shall mean:
Northport Shoreland Zoning Ordinance
- 47 -
a. That the land in question cannot yield a reasonable return unless a
variance is granted;
b. That the need for a variance is due to the unique circumstances of
the property and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential
character of the locality; and
d. That the hardship is not the result of action taken by the applicant
or a prior owner.
d. Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals may
grant a variance to an owner of a residential dwelling for the purpose of
making that dwelling accessible to a person with a disability who resides in or
regularly uses the dwelling. The board shall restrict any variance granted
under this subsection solely to the installation of equipment or the
construction of structures necessary for access to or egress from the dwelling
by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to
the time that the person with the disability lives in the dwelling. The term
"structures necessary for access to or egress from the dwelling" shall include
railing, wall or roof systems necessary for the safety or effectiveness of the
structure. Any permit issued pursuant to this subsection is subject to Sections
16(H)(2)(f) and 16 (H)(4)(b)(iv) below.
e. The Board of Appeals shall limit any variances granted as strictly as
possible in order to ensure conformance with the purposes and provisions of
this Ordinance to the greatest extent possible, and in doing so may impose
such conditions to a variance as it deems necessary. The party receiving the
variance shall comply with any conditions imposed.
f. A copy of each variance request, including the application and all
supporting information supplied by the applicant, shall be forwarded by the
municipal officials to the Commissioner of the Department of Environmental
Protection at least twenty (20) days prior to action by the Board of Appeals.
Any comments received from the Commissioner prior to the action by the
Board of Appeals shall be made part of the record and shall be taken into
consideration by the Board of Appeals.
3. Administrative Appeals
Northport Shoreland Zoning Ordinance
- 48 -
When the Board of Appeals reviews a decision of the Code Enforcement
Officer the Board of Appeals shall hold a "de novo" hearing. At this time the
Board may receive and consider new evidence and testimony, be it oral or
written. When acting in a "de novo" capacity the Board of Appeals shall hear
and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall
hold an appellate hearing, and may reverse the decision of the Planning
Board only upon finding that the decision was contrary to specific provisions
of the Ordinance or contrary to the facts presented to the Planning Board.
The Board of Appeals may only review the record of the proceedings before
the Planning Board. The Board Appeals shall not receive or consider any
evidence which was not presented to the Planning Board, but the Board of
Appeals may receive and consider written or oral arguments. If the Board of
Appeals determines that the record of the Planning Board proceedings are
inadequate, the Board of Appeals may remand the matter to the Planning
Board for additional fact finding.
4. Appeal Procedure
a. Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of
Appeals by an aggrieved party from any decision of the Code Enforcement
Officer or the Planning Board, except for enforcement-related matters as
described in Section 16(H)(1)(a) above. Such an appeal shall be taken
within thirty (30) days of the date of the official, written decision
appealed from, and not otherwise, except that the Board, upon a showing
of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of
Appeals a written notice of appeal which includes:
a. A concise written statement indicating what relief is requested
and why the appeal or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing
buildings and structures and other physical features of the lot
pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a
variance, the Code Enforcement Officer or Planning Board, as appropriate,
Northport Shoreland Zoning Ordinance
- 49 -
shall transmit to the Board of Appeals all of the papers constituting the
record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative
appeal or a request for a variance within thirty-five (35) days of its receipt
of a complete written application, unless this time period is extended by
the parties.
b. Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute
a quorum for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals
within thirty five (35) days after the close of the hearing, and shall issue a
written decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision,
including a statement of the facts found and conclusions reached by the
Board. The Board shall cause written notice of its decision to be mailed or
hand-delivered to the applicant and to the Department of Environmental
Protection within seven (7) days of the Board's decision. Copies of
written decisions of the Board of Appeals shall be given to the Planning
Board, Code Enforcement Officer, and the municipal officers.
5. Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section
2691(3)(F), any aggrieved party who participated as a party during the
proceedings before the Board of Appeals may take an appeal to Superior Court in
accordance with State laws within forty-five (45) days from the date of any
decision of the Board of Appeals.
6. Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the
Board of Appeals may reconsider any decision within forty-five (45) days of its
prior decision. A request to the Board to reconsider a decision must be filed
within ten (10) days of the decision that is being reconsidered. A vote to
reconsider and the action taken on that reconsideration must occur and be
completed within forty-five (45) days of the date of the vote on the original
decision. Reconsideration of a decision shall require a positive vote of the
majority of the Board members originally voting on the decision, and proper
notification to the landowner, petitioner, planning board, code enforcement
officer, and other parties of interest, including abuttors and those who testified
Northport Shoreland Zoning Ordinance
- 50 -
at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen
(15) days after the decision on reconsideration.
I. Enforcement
1. Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
2. Code Enforcement Officer
a. It shall be the duty of the Code Enforcement Officer to enforce the
provisions of this Ordinance. If the Code Enforcement Officer shall find that
any provision of this Ordinance is being violated, he or she shall notify in
writing the person responsible for such violation, indicating the nature of the
violation and ordering the action necessary to correct it, including
discontinuance of illegal use of land, buildings or structures, or work being
done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal
officers and be maintained as a permanent record.
b. The Code Enforcement Officer shall conduct on-site inspections to insure
compliance with all applicable laws and conditions attached to permit
approvals. The Code Enforcement Officer shall also investigate all complaints
of alleged violations of this Ordinance.
c. The Code Enforcement Officer shall keep a complete record of all
essential transactions of the office, including applications submitted, permits
granted or denied, variances granted or denied, revocation actions,
revocation of permits, appeals, court actions, violations investigated,
violations found, and fees collected.
3. Legal Actions. When the above action does not result in the correction or
abatement of the violation or nuisance condition, the Municipal Officers, upon
notice from the Code Enforcement Officer, are hereby directed to institute any
and all actions and proceedings, either legal or equitable, including seeking
injunctions of violations and the imposition of fines, that may be appropriate or
necessary to enforce the provisions of this Ordinance in the name of the
municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of
eliminating violations of this Ordinance and recovering fines without Court
action. Such agreements shall not allow an illegal structure or use to continue
unless there is clear and convincing evidence that the illegal structure or use was
Northport Shoreland Zoning Ordinance
- 51 -
constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted in
bad faith, or unless the removal of the structure or use will result in a threat or
hazard to public health and safety or will result in substantial environmental
damage.
4. Fines. Any person, including but not limited to a landowner, a landowner's
agent or a contractor, who violates any provision or requirement of this
Ordinance shall be penalized in accordance with 30-A, M.R.S.A. section 4452.
J. Fees
The Selectmen in the Town of Northport shall set fees from time to time where
appropriate.
Section 17.
Definitions.
Accessory structure or use - a use or structure which is incidental and subordinate to
the principal use or structure. Accessory uses, when aggregated, shall not
subordinate the principal use of the lot. A deck or similar extension of the principal
structure or a garage attached to the principal structure by a roof or a common wall
is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected
by the granting or denial of a permit or variance under this Ordinance; a person
whose land abuts land for which a permit or variance has been granted; or any other
person or group of persons who have suffered particularized injury as a result of the
granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease of plants or
animals, including, but not limited to, forages and sod crops, grains and seed crops,
dairy animals and dairy products, poultry and poultry products,livestock, fruits and
vegetables; and ornamental green-house products. Agriculture does not include
forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or
marine plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level
and inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more
and having more than 50% of its volume below the existing ground level.
Northport Shoreland Zoning Ordinance
- 52 -
Boat Launching Facility - a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces
for vehicles and trailers.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation,
Forestry, Bureau of Forestry
Campground - any area or tract of land to accommodate two (2) or more parties in
temporary living quarters, including, but not limited to tents, recreational vehicles or
other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded
area.
Commercial use - the use of lands, buildings, or structures, other than a "home
occupation," defined below, the intent and result of which activity is the production
of income from the buying and selling of goods and/or services, exclusive of rental of
residential buildings and/or dwelling units.
Development - a change in land use involving alteration of the land, water or
vegetation, or the addition or alteration of structures or other construction not
naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships
including but not limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect
or mental condition caused by bodily injury, accident, disease, birth defect,
environmental conditions or illness; and also includes the physical or mental
condition of a person which constitutes a substantial handicap as determined by a
physician or in the case of mental handicap, by a psychiatrist or psychologist, as well
as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving
two single-family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general
welfare, such as protection of resources from immediate destruction or loss, law
enforcement, and operations to rescue human beings, property and livestock from
the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric
power or water transmission or distribution lines, towers and related equipment;
telephone cables or lines, poles and related equipment; gas, oil, water, slurry or other
Northport Shoreland Zoning Ordinance
- 53 -
similar pipelines; municipal sewage lines, collection or supply systems; and associated
storage tanks. Such systems may include towers, poles, wires, mains, drains, pipes,
conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar
accessories, but shall not include service drops or buildings which are necessary for
the furnishing of such services.
Expansion of a structure - an increase in the footprint of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and
greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or
the use of more footprintof a structure or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single
housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that
must be reserved in order to discharge the 100-year flood without cumulatively
increasing the water surface elevation by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six
(6) meters tall (approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding
wooden sills and post supports, but including basements, slabs, frostwalls, or other
base consisting of concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other
than forested wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent
to a surface water body, excluding any river, stream or brook, such that in a natural
state, the combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a
duration sufficient to support, and which under normal circumstances do support, a
prevalence of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do
not conform to the criteria of this definition.
Northport Shoreland Zoning Ordinance
- 54 -
Functionally water-dependent uses - those uses that require, for their primary
purpose, location on submerged lands or that require direct access to, or location in,
inland waters and that can not be located away from these waters. The uses include,
but are not limited to, commercial and recreational fishing and boating facilities, ,
finfish and shellfish processing, fish-related storage and retail and wholesale fish
marketing facilities, waterfront dock and port facilities, shipyards and boat building
facilities, marinas, navigation aids, basins and channels, shoreline structures
necessary for erosion control purposes, industrial uses dependent upon water-borne
transportation or requiring large volumes of cooling or processing water that can
not reasonably be located or operated at an inland site, and uses that primarily
provide general public access to inland waters. Recreational boat storage buildings
are not considered to be a functionally water-depend
Great pond - any inland body of water which in a natural state has a surface area in
excess of ten acres, and any inland body of water artificially formed or increased
which has a surface area in excess of thirty (30) acres except for the purposes of this
Ordinance, where the artificially formed or increased inland body of water is
completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A.
Article 4-A Section 465-A. This classification includes some, but not all
impoundments of rivers that are defined as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially
decayed organic matter of the forest floor.
Harvest Area - the area where timber harvesting and related activities, including the
cutting of trees, skidding, yarding, and associated road construction take place. The
area affected by a harvest encompasses the area within the outer boundaries of
these activities, excepting unharvested areas greater than 10 acres within the area
affected by a harvest.
Harzard tree - a tree with a structural defect, combination of defects, or disease
resulting in a structural defect that under the normal range of environmental
conditions at the site exhibits a high probability of failure and loss od a major
structural component of the tree in a manner that will skrike a target. A normal
range of environmental conditions does not include meteorological anomalies, such
as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts; or
significant ice storm events. Hazard trees also include those trees that pose a serious
and imminent rick to bank stability. A target is the area where personal injury or
property damage could occur if the tree or a portion of the tree fails. Targets include
roads, driveways, parking areas, structures, campsites, and any other developed area
where people frequently gather or linger.
Northport Shoreland Zoning Ordinance
- 55 -
Height of a structure - the vertical distance between the mean original (prior to
construction) grade at the downhill side of the structure and the highest point of the
structure, excluding chimneys, steeples, antennas, and similar appurtenances that
have no floor area.
Home occupation - an occupation or profession which is customarily conducted on
or in a residential structure or property and which is 1) clearly incidental to and
compatible with the residential use of the property and surrounding residential uses;
and 2) which employs no more than two (2) persons other than family members
residing in the home.
Increase in nonconformity of a structure - any change in a structure or property
which causes further deviation from the dimensional standard(s) creating the
nonconformity such as, but not limited to, reduction in water body, tributary stream
or wetland setback distance, increase in lot coverage, or increase in height of a
structure. Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase
nonconformity. For example, there is no increase in nonconformity with the setback
requirement for water bodies, wetlands, or tributary streams if the expansion
extends no further into the required setback area than does any portion of the
existing nonconforming structure. Hence, a structure may be expanded laterally
provided that the expansion extends no closer to the water body, tributary stream,
or wetland than the closest portion of the existing structure from that water body,
tributary stream, or wetland. Included in this allowance are expansions which in-fill
irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a
campground, but which is developed for repeated camping by only one group not to
exceed ten (10) individuals and which involves site improvements which may include
but not be limited to a gravel pad, parking area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or
processing of goods, or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church,
library, public or private school, hospital, or municipally owned or operated building,
structure or land used for public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land
below the normal high-water line of a water body or upland edge of a wetland and
areas beneath roads serving more than two lots.
Northport Shoreland Zoning Ordinance
- 56 -
Marina - a business establishment having frontage on navigable water and, as its
principal use, providing for hire offshore moorings or docking facilities for boats, and
which may also provide accessory services such as boat and related sales, boat repair
and construction, indoor and outdoor storage of boats and marine equipment, bait
and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and
under prevailing market conditions in a sale between a willing seller and a willing
buyer, both conversant with the property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining
the nature or extent of mineral resources which create minimal disturbance to the
land and which include reasonable measures to restore the land to its original
condition.
Mineral extraction - any operation within any twelve (12) month period which
removes more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel,
clay, rock, peat, or other like material from its natural location and to transport the
product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only
two lot lines extend into the shoreland zone, both lot lines shall be considered to be side
lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential
dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed
solely because it was in lawful existence at the time this Ordinance or subsequent
amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements
of the district in which it is located.
Non-conforming structure - a structure which does not meet any one or more of the
following dimensional requirements; setback, height, lot coverage or footprint, but
which is allowed solely because it was in lawful existence at the time this Ordinance or
subsequent amendments took effect.
Northport Shoreland Zoning Ordinance
- 57 -
Non-conforming use - use of buildings, structures, premises, land or parts thereof which
is not allowed in the district in which it is situated, but which is allowed to remain solely
because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect.
Non-native species of vegetation - species of vegetation listed by the Maine
Department of Agriculture, Conservation and Forestry as being invasive in Maine
ecosystems and not native to Maine ecosystems.
Normal high-water line - that line which is apparent from visible markings, changes in
the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land.
Areas contiguous with rivers and great ponds that support non-forested wetland
vegetation and hydric soils and that are at the same or lower elevation as the water level
of the river or great pond during the period of normal high-water are considered part of
the river or great pond.
Outlet stream - any perennial or intermittent stream, as shown on the most recent
higest resolution version of the national hydrography dataset available from the United
States Geological Survey on the website of the United States Geological Survey or the
national map, that flows from a freshwater wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or
other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond
the normal high-water line or within a wetland.
Temporary:
Structures which remain in or over the water for less than seven (7)
months in any period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
Principal structure - a structure other than one which is used for purposes wholly
incidental or accessory to the use of another structure or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another
use on the same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation
areas, and roads, which are owned, leased, or otherwise operated, or funded by a
governmental body or public entity.
Northport Shoreland Zoning Ordinance
- 58 -
Recent floodplain soils - the following soil series as described and identified by the
National Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure
time activities, and other customary and usual recreational activities, excluding boat
launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which
may include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home.
In order to be considered as a vehicle and not as a structure, the unit must remain with
its tires on the ground, and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is
either malfunctioning or being upgraded with no significant change of design flow or use
of the structure, or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively
for use as permanent, seasonal, or temporary living quarters for only one family at a
time, and containing cooking, sleeping and toilet facilities. The term shall include mobile
homes and rental units that contain cooking, sleeping, and toilet facilities regardless of
the time-period rented. Recreational vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion
control and soil stabilization, typically used on ground slopes of two (2) units horizontal
to one (1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from
that point at which it provides drainage for a watershed of twenty five (25) square miles
to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or
other surfacing material constructed for or created by the repeated passage of
motorized vehicles, excluding a driveway as defined.
Northport Shoreland Zoning Ordinance
- 59 -
Salt marsh - Areas of coastal wetland (most often along coastal bays) that support salt
tolerant species, and where at average high tide during the growing season, the soil is
irregularly inundated by tidal waters. The predominant species is saltmarsh cordgrass
(Spartina alterniflora). More open areas often support widgeon grass, eelgrass, and Sago
pondweed.
Salt meadow - Areas of a coastal wetland that support salt tolerant plant species
bordering the landward side of salt marshes or open coastal water, where the soil is
saturated during the growing season but which is rarely inundated by tidal water.
Indigenous plant species include salt meadow cordgrass (Spartina patens) and black rush;
common threesquare occurs in fresher areas.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half
(4.5) feet above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height
above ground level.
Service drop - any utility line extension which does not cross or run beneath any portion
of a water body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located
entirely upon the premises of the customer requesting service or upon a roadway
right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of
telephone wires to existing utility poles, or
b. the extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water
body or tributary stream, or upland edge of a wetland, to the nearest part of a structure,
road, parking space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a
straight line between the intersections of the lot lines with the shoreline.
Northport Shoreland Zoning Ordinance
- 60 -
Shoreland zone - the land area located within two hundred and fifty (250) feet,
horizontal distance, of the normal high-water line of any great pond or river; within 250
feet of the upland edge of a freshwater wetland; or within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream.
Significant River Segments - See Appendix A or 38 M.R.S.A. section 437.
Shoreline - the normal high-water line, or upland edge of a freshwater or coastal
wetland.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the
ground, or that remains standing and is damaged beyond the point of recovery as the
result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence
of two (2) perennial streams as depicted on the most recent , highest resolution version
of the national hydrography dataset available from the United States Geological Survey
on the website of the United States Geological Survey or the national map, to the point
where the stream becomes a river or where the stream meets the shoreland zone of
another water body or wetland. When a stream meets the shoreland zone of a water
body or wetland and a channel forms downstream of the water body or wetland as an
outlet, that channel is also a stream..
Structure - anything temporarily or permanently located, built, constructed or erected
for the support, shelter or enclosure of persons, animals, goods or property of any kind,
or anything constructed or on or in the ground, The term includes structures temporarily
or permanently located, such as decks, patios, and satellite dishes. Structure does not
include fences; poles and wiring and other aerial equipment normally associated with
service drops, including guy wires and guy anchors; subsurface waste water disposal
systems as defined in Title 30-A, Section 4201, subsection 5; geothermal heat exchange
wells as defined in Title 32, Section 4700-E, subsection 3-C; or wells or water wells as
defined in Title 32, Section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use
measured as a percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste
water on or beneath the surface of the earth; includes, but is not limited to: septic tanks;
disposal fields; grandfathered cesspools; holding tanks; pretreatment filter, piping, or
any other fixture, mechanism, or apparatus used for those purposes; does not include
any discharge system licensed under 38 M.R.S.A. section 414, any surface waste water
disposal system, or any municipal or quasi-municipal sewer or waste water treatment
system..
Northport Shoreland Zoning Ordinance
- 61 -
Sustained slope - a change in elevation where the referenced percent grade is
substantially maintained or exceeded throughout the measured area.
Tidal waters - all waters affected by tidal action during the higest annual tide.
Timber harvesting and related activities - timber harvesting, the construction and
maintenance of roads used primarily for timber harvesting and other activities
conducted to facilitate timber harvesting.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in
diameter at four and one half (4.5) feet above the ground, with a more or less definite
crown, and reaching a height of at least ten (10) feet at maturity.
Tributary stream - means a channel between defined banks created by the action of
surface water, which is characterized by the lack of terrestrial vegetation or by the
presence of a bed, devoid of topsoil, containing waterborne deposits or exposed soil,
parent material or bedrock; and which is connected hydrologically with other water
bodies. "Tributary stream" does not include rills or gullies forming because of
accelerated erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this
Ordinance, and only applies to that portion of the tributary stream located within the
shoreland zone of the receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland
zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of
a coastal wetland, this boundry is the line formed by the landward limits of the salt
tolerant vegetation and/or the higest annual tide level, including all areas affected by
tidal action. For purposes of a freshwater wetland, the upland edge is formed where the
soils are not saturated for a duration sufficient to support wetland vegetation; or where
the soils support the growth of wetland vegetation, but such vegetation is dominated by
woody stems that are six (6) meters (approximately twenty (20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees
both over and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and
fixed exterior walls as measured from the exterior faces of these walls and roof.
Northport Shoreland Zoning Ordinance
- 62 -
Velocity zone - an area of special flood hazard extending from offshore to the inland limit
of the primary frontal dune along an open coast and any other area subject to high
velocity wave action from storms or seismic sources.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river,
stream, tributary stream, or wetland whether under, through, or over the water or
wetland. Such projects include but may not be limited to roads, fords, bridges, culverts,
water lines, sewer lines, and cables as well as maintenance work on these crossings. This
definition includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater wetland.
Windmill- a machine that is powered by the energy of the wind. It is designed to convert
the energy of the wind into more useful forms using rotating blades or sails. The term
also refers to the structure it is commonly built on.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
A true copy attest of the Town of Northport Shoreland Zoning Ordinance approved at
Annual Town Meeting on June 6, 2022.
____________________________
Amy Eldridge
Town Clerk