This is the exact embedded text of the captured official document.
Snapshot c188eeef75b7 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF NORWAY
FLOODPLAIN MANAGEMENT ORDINANCE
Enacted July 7, 2009
FLOODPLAIN MANAGEMENT ORDINANCE
CONTENTS
ARTICLE
I. PURPOSE AND ESTABLISHMENT
II. PERMIT REQUIRED
III. APPLICATION FOR PERMIT
IV. APPLICATION FEE AND EXPERT'S FEE
V. REVIEW STANDARDS FOR FLOOD HAZARD
DEVELOPMENT PERMIT APPLICATIONS
VI. DEVELOPMENT STANDARDS
VII. CERTIFICATE OF COMPLIANCE
VIII. REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS
IX. APPEALS AND VARIANCES
X. ENFORCEMENT AND PENALTIES
XI. VALIDITY AND SEVERABILITY
XII. CONFLICT WITH OTHER ORDINANCES
XIII. DEFINITIONS
XIV. ABROGATION
60.3 (c&d) Rev. 1/07
Article I - PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Norway, Maine, are subject to periodic flooding,
causing serious damages to properties within these areas. Relief is available in the form
of flood insurance as authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of Norway, Maine, has chosen to become a participating
community in the National Flood Insurance Program, and agrees to comply with the
requirements of the National Flood Insurance Act of 1968 (P.L. 90-488, as amended) as
delineated in this Floodplain Management Ordinance.
It is the intent of the Town of Norway, Maine to require the recognition and
evaluation of flood hazards in all official actions relating to land use in the floodplain
areas having special flood hazards.
The Town of Norway, Maine has the legal authority to adopt land use and control
measures to reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-
3007, 4352, 4401-4407, and Title 38 MRSA, Section 440.
The National Flood Insurance Program, established in the aforesaid Act, provides
that areas of the Town of Norway having a special flood hazard be identified by the
Federal Emergency Management Agency and that floodplain management measures be
applied in such flood hazard areas. This Ordinance establishes a Flood Hazard
Development Permit system and review procedure for development activities in the
designated flood hazard areas of the Town of Norway, Maine.
The areas of special flood hazard, Zones A and AE, are identified by the Federal
Emergency Management Agency in a report entitled "Flood Insurance Study - Oxford
County", dated July 7, 2009 with accompanying "Flood Insurance Rate Map" Panels:
1039, 1045, 1065, 1068, 1202, 1206, 1207, 1208, 1209, 1217, 1229, 1230, 1231, 1232,
1233, 1234, 1236, 1237, 1238, 1241; derived from the county wide digital flood
insurance rate map entitled "Digital Flood Insurance Rate Map, Oxford County", which
are hereby adopted by reference and declared to be a part of this Ordinance.
Article II - PERMIT REQUIRED
Before any construction or other development (as defined in Article XIII),
including the placement of manufactured homes, begins within any areas of special flood
hazard established in Article I, a Flood Hazard Development Permit shall be obtained
from the Code Enforcement Officer. This permit shall be in addition to any other permits
which may be required pursuant to the codes and ordinances of the Town of Norway,
Maine.
Article III - APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted to the
Code Enforcement Officer and shall include:
A. The name, address and phone number of the applicant, owner and contractor;
B. An address and a map indicating the location of the construction site;
C. A site plan showing location of existing and/or proposed development,
including but not limited to structures, sewage disposal facilities, water supply
facilities, areas to be cut and filled, and lot dimensions;
D. A statement of the intended use of the structure and/or development;
E. A statement of the cost of the development, including all materials and labor;
F. A statement as to the type of sewage system proposed;
G. Specification of dimensions of the proposed structure(s) and/or development;
[Items H-K.2 apply only to new construction and substantial improvements.]
H. The elevation in relation to the National Geodetic Vertical Datum NGVD), or
to a locally established datum in Zone A only, of the:
1. base flood at the proposed site of all new or substantially improved
structures, which is determined:
a. in Zones AE, from data contained in the "Flood Insurance Study
- Oxford County", as described in Article I; or
b. in Zone A:
1) from any base flood elevation data from federal, state, or
other technical sources, (such as FEMA's Quick-2 model,
FEMA 265/July 1995), including information obtained
pursuant to Articles VI.K and VIII.D
2) from the contour elevation extrapolated from a best fit
analysis of the floodplain boundary when overlaid onto a
USGS Quadrangle Map or other topographic map prepared
by a Professional Land Surveyor or registered professional
engineer, if the floodplain boundary has a significant
correlation to the elevation contour line(s); or, in the
absence of all other data-
3) to be the elevation of the ground at the intersection of
the floodplain boundary and a line perpendicular to the
shoreline which passes along the ground through the site of
the proposed building.
2. highest and lowest grades at the site adjacent to the walls of the
proposed building;
3. lowest floor, including basement; and whether or not such structures
contain a basement; and
4. level, in the case of non-residential structures only, to which the
structure will be flood-proofed;
I. A description of an elevation reference point established on the site of all
developments for which elevation standards apply as required in Article VI;
J. A written certification by a Professional Land Surveyor, registered professional
engineer or architect, that the base flood elevation and grade elevations shown on
the application are accurate;
K. The following certifications as required in Article VI by a registered
professional engineer or architect;
1. a Flood-proofing Certificate (FEMA Form 81-65, 01/03, as
amended),to verify that the flood-proofing methods for any non-
residential structures will meet the flood-proofing criteria of Article
III.H.4; Article VI.G; and other applicable standards in Article VI;
2. a Hydraulic Openings Certificate to verify that engineered hydraulic
openings in foundation walls will meet the standards of Article VI.L.2.a;
3. a certified statement that bridges will meet the standards of Article
VI.M;
4. a certified statement that containment walls will meet the standards of
Article VI.N;
L. A description of the extent to which any watercourse will be altered or
relocated as a result of the proposed development; and
M. A statement of construction plans describing in detail how each applicable
development standard in Article VI will be met.
Article IV - APPLICATION FEE AND EXPERT'S FEE
A non-refundable application fee of $25.00 shall be paid to the Code Enforcement
Officer, and a copy of a receipt for same shall accompany the application.
An additional fee may be charged if the assistance of a professional engineer or other
expert is required. The expert's fee shall be paid in full by the applicant within 10 days
after the town submits a bill to the applicant. Failure to pay the bill shall constitute a
violation of the ordinance and be grounds for the issuance of a stop work order. An
expert shall not be hired by the municipality at the expense of an applicant until the
applicant has either consented to such hiring in writing or been given an opportunity to
be heard on the subject. An applicant who is dissatisfied with a decision to hire expert
assistance may appeal that decision to the Board of Appeals.
Article V - REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT
PERMIT APPLICATIONS
The Code Enforcement Officer shall:
A. Review all applications for the Flood Hazard Development Permit to assure that
proposed developments are reasonably safe from flooding and to determine that all
pertinent requirements of Article VI (Development Standards) have been, or will be met;
B. Utilize, in the review of all Flood Hazard Development Permit applications:
1. the base flood and floodway data contained in the "Flood Insurance Study -
Oxford County", as described in Article I;
2. in special flood hazard areas where base flood elevation and floodway data are
not provided, the Code Enforcement Officer shall obtain, review and reasonably
utilize any base flood elevation and floodway data from federal, state or other
technical sources, including information obtained pursuant to Article III. H. 1. b;
3. when the community establishes a base flood elevation in a Zone A, by
methods outlined in Article III. H. 1. b, the community shall submit that data to
the Maine Floodplain Management Program in the State Planning Office.
C. Make interpretations of the location of boundaries of special flood hazard areas
shown on the maps described in Article I of this Ordinance;
D. In the review of Flood Hazard Development Permit applications, determine that all
necessary permits have been obtained from those federal, state, and local government
agencies from which prior approval is required by federal or state law, including but not
limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972,
33 U.S.C 1344;
E. Notify adjacent municipalities, the Department of Environmental Protection, and the
Maine Floodplain Management Program in the State Planning Office prior to any
alteration or relocation of a watercourse, and submit copies of such notifications to the
Federal Emergency Management Agency;
F. If the application satisfies the requirements of this Ordinance, approve the issuance of
one of the following Flood Hazard Development Permits based on the type of
development:
1. A two part Flood Hazard Development Permit for elevated structures. Part I
shall authorize the applicant to build a structure to and including the first
horizontal floor only above the base flood level. At that time the applicant shall
provide the Code Enforcement Officer with an Elevation Certificate completed by
a Professional Land Surveyor, registered professional engineer or architect based
on the Part I permit construction, "as built", for verifying compliance with the
elevation requirement of Article VI, paragraphs F, G, or H. Following review of
the Elevation Certificate data, which shall take place within 72 hours of receipt of
the application, the Code Enforcement Officer shall issue Part II of the Flood
Hazard Development Permit. Part II shall authorize the applicant to complete the
construction project; or
2. A Flood Hazard Development Permit for Flood-proofing of Non-Residential
Structures that are new construction of substantially improved non-residential
structures that are not being elevated but that meet the flood-proofing standards of
Article VI. G.1. a., b., and c.
3. A Flood Hazard Development Permit for Minor Development for all
development that is not new construction or a substantial improvement, such as
repairs, maintenance, renovations, or additions, whose value is less than 50% of
the market value of the structure. Minor development also includes, but is not
limited to: accessory structures as provided for in Article VI. J., mining,
dredging, filling, grading, paving, excavation, drilling operations, storage of
equipment or materials, deposition or extraction of materials, public or private
sewage disposal systems or water supply facilities that do not involve structures;
and non-structural projects such as bridges, dams, towers, fencing, pipelines,
wharves and piers.
G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit
Applications, corresponding Permits issued, and data relevant thereto, including reports
of the Board of Appeals on variances granted under the provisions of Article IX of this
Ordinance, and copies of Elevation Certificates, Flood-proofing Certificates,
Certificates of Compliance, and certifications of design standards required under the
provisions of Articles III, VI, and VII of this Ordinance.
Article VI - DEVELOPMENT STANDARDS
All developments in areas of special flood hazard shall meet the following applicable
standards:
A. All Developments shall:
1. be designed or modified and adequately anchored to prevent flotation
(excluding piers and docks), collapse or lateral movement of the development
resulting from hydrodynamic and hydrostatic loads, including the effects of
buoyancy;
2. use construction materials that are resistant to flood damage;
3. use construction methods and practices that will minimize flood damage; and
4. use electrical, heating, ventilation, plumbing, and air conditioning equipment,
and other service facilities that are designed and/or located so as to prevent water
from entering or accumulating within the components during flooding conditions.
B. Water Supply - All new and replacement water supply systems shall be designed to
minimize or eliminate infiltration of flood waters into the system and discharges from the
system into flood waters.
C. Sanitary Sewage Systems - All new and replacement sanitary sewage systems shall
be designed and located to minimize or eliminate infiltration of flood waters into the
system and discharges from the system into flood waters.
D. On Site Waste Disposal Systems - On site waste disposal systems shall be located
and constructed to avoid impairment to them or contamination from them during floods.
E. Watercourse Carrying Capacity - All development associated with altered or relocated
portions of a watercourse shall be constructed and maintained in such a manner that no
reduction occurs in their carrying capacity.
F. Residential - New construction or substantial improvement of any residential structure
located within:
1. Zones AE shall have the lowest floor (including basement) elevated to at least
one foot above the base flood elevation;
2. Zone A shall have the lowest floor (including basement) elevated to at least
one foot above the base flood elevation utilizing information obtained pursuant to
Article III. H. 1. b; Article V. B; or Article VIII. D.
G. Non-Residential - New construction or substantial improvement of any non-
residential structure located within:
1. Zone AE shall have the lowest floor (including basement) elevated to at least
one foot above the base flood elevation, or together with attendant utility and
sanitary facilities shall:
a. be flood-proofed to at least one foot above the base flood elevation so
that below that elevation the structure is watertight with walls
substantially impermeable to the passage of water;
b. have structural components capable of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy;
c. be certified by a registered professional engineer or architect that the
flood-proofing design and methods of construction are in accordance with
accepted standards of practice for meeting the provisions of this section.
Such certification shall be provided with the application for a Flood
Hazard Development Permit, as required by Article III. K, and shall
include a record of the elevation above mean sea level to which the
structure is flood-proofed
2. Zone A shall have the lowest floor (including basement) elevated to at least
one foot above the base flood elevation utilizing information obtained pursuant to
Article III. H. 1. b; Article V. B; or Article VIII. D.
a. together with attendant utility and sanitary facilities that meet the
flood-proofing standards of Article VI. G. 1.
H. Manufactured Homes - New or substantially improved manufactured homes located
within:
1. Zone AE shall:
a. be elevated such that the lowest floor (including basement) of the
manufactured home is at least one foot above the base flood elevation.
b. be on a permanent foundation, which may be poured masonry slab or
foundation walls, with hydraulic openings, or may be reinforced piers or
block supports, and of which support the manufactured home so that no
weight is supported by its wheels and axles; and
c. be securely anchored to any adequately anchored foundation system to
resist flotation, collapse or lateral movement. Methods of anchoring may
include, but are not limited to:
1) over-the-top ties anchored to the ground at the four corners of
the manufactured home, plus two additional ties per side at
intermediate points (manufactured homes less than 50 feet long
require one additional tie per side); or by
2) frame ties at each corner of the home, plus five additional ties
along each side at intermediate points (manufactured homes less
than 50 feet long require four additional ties per side).
3) all components of the anchoring system described in Article VI.
H. 1. c (1) & (2) shall be capable of carrying a force of 4800
pounds.
2. Zone A shall:
a. be elevated on a permanent foundation, as described in Article VI. H. 1.
b., such that the lowest floor (including basement) of the manufactured
home is at least one foot above the base flood elevation utilizing
information obtained pursuant to Article III. H. 1. b; Article V. B; or
Article VIII. D; and
b. meet the anchoring requirements of Article VI. H. 1. c.
I. Recreational Vehicles located within:
1. Zones A and AE, shall either:
a. be on the site for fewer than 180 days;
b. be fully licensed and ready for highway use. A recreational vehicle is
ready for highway use if it is on its wheels or jacking system, is attached
to the site only by quick disconnect type utilities and security devices, and
has no permanently attached additions; or
c. be permitted in accordance with the elevation and anchoring
requirements for "manufactured homes" in Article VI. H. 1.
J. Accessory Structures- as defined in Article XIII, located within Zones A1 - 30, AE,
and A, shall be exempt from the elevation criteria required in Article VI. F. & G. above, if
all other requirements of Article VI and all the following requirements are met.
Accessory Structures shall:
1. be 500 square feet or less and have a value of less than $3000;
2. have unfinished interiors and not be used for human habitation;
3. have hydraulic openings, as specified in Article VI. L. 2, in at least two
different walls of the accessory structure;
4. be located outside the floodway;
5. when possible be constructed and placed on the building site so as to offer the
minimum resistance to the flow of floodwaters and be placed further from the
source of flooding than is the primary structure; and
6. have only ground fault interrupt electrical outlets. The electrical service
disconnect shall be located above the base flood elevation and when possible
outside the Special Flood Hazard Area.
K. Floodways-
1. In Zones A and AE riverine areas, encroachments, including fill, new
construction, substantial improvement, and other development shall not be
permitted within a regulatory floodway which is designated on the community's
"Flood Insurance Rate Map" or "Flood Boundary and Floodway Map", unless a
unless a technical evaluation certified by a registered professional engineer is
provided demonstrating that such encroachments will not result in any increase in
flood levels with the community during the occurrence of the base flood
discharge.
2. In Zones A and AE riverine areas for which no regulatory floodway is
designated, encroachments, including fill, new construction, substantial
improvement, and other development shall not be permitted in the floodway as
determined in Article VI. K. 3, unless a technical evaluation certified by a
registered professional engineer is provided demonstrating that the cumulative
effect of the proposed development, when combined with all other existing
development and anticipated development:
a. will not increase the water surface elevation of the base flood more
than one foot at any point within the community; and
b. is consistent with the technical criteria contained in Chapter 5 entitled
"Hydraulic Analysis", Flood Insurance Study - Guidelines and
Specifications for Study Contractors, (FEMA 37/January 1995, as
amended).
3. In Zones AE, and A riverine areas for which no regulatory floodway is
designated, the regulatory floodway is determined to be the channel of the river or
other watercourse and the adjacent land areas to a distance of one-half the width
of the floodplain as measured from the normal high water mark to the upland
limit of the floodplain.
L. Enclosed Areas Below the Lowest Floor - New construction or substantial
improvement of any structure in Zones AE and A that meets the development standards
of Article VI, including the elevation requirements of Article VI, paragraphs F, G, or H
and is elevated on posts, columns, piers, piles, "stilts", or crawlspaces may be enclosed
below the base flood elevation requirements provided all the following criteria are met or
exceeded:
1. Enclosed areas are not "basements" as defined in Article XIII;
2. Enclosed areas shall be designed to automatically equalize hydrostatic flood
forces on exterior walls by allowing for the entry and exit of flood water. Designs
for meeting this requirement must either:
a. be engineered and certified by a registered professional engineer or
architect; or
b. meet or exceed the following minimum criteria:
1) a minimum of two openings having a total net area of not less
than one square inch for every square foot of the enclosed area;
2) the bottom of all openings shall be below the base flood
elevation and no higher than one foot above the lowest grade; and
3) openings may be equipped with screens, louvers, valves or
other coverings or devices provided that they permit the entry and
exit of flood waters automatically without any external influence
or control such as human intervention, including the use of
electrical and other non-automatic mechanical means;
3. The enclosed area shall not be used for human habitation; and
4. The enclosed areas are usable solely for building access, parking of vehicles,
or storage.
M. Bridges - New construction or substantial improvement of any bridge in Zones AE
and A shall be designed such that:
1. when possible, the lowest horizontal member (excluding the pilings, or
columns) is elevated to at least one foot above the base flood elevation; and
2. a registered professional engineer shall certify that:
a. the structural design and methods of construction shall meet the
elevation requirements of this section and the floodway standards of
Article VI. K; and
b. the foundation and superstructure attached thereto are designed to resist
flotation, collapse and lateral movement due to the effect of wind and
water loads acting simultaneously on all structural components. Water
loading values used shall be those associated with the base flood.
N. Containment Walls - New construction or substantial improvement of any
containment wall located within:
1. Zones AE and A shall:
a. have the containment wall elevated to at least one foot above the base
flood elevation;
b. have structural components capable of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy; and
c. be certified by a registered professional engineer or architect that the
design and methods of construction are in accordance with accepted
standards of practice for meeting the provisions of this section. Such
certification shall be provided with the application for Flood Hazard
Development Permit, as required by Article III. K.
O. Wharves, Pier and Docks - New construction or substantial improvement of wharves,
piers or docks are permitted in Zones AE and A, in and over water and seaward of the
mean high tide if the following requirements are met:
1. wharves, piers and docks shall comply with all applicable local, state and
federal regulations; and
2. for commercial wharves, piers and docks, a registered professional engineer
shall develop or review the structural design, specifications, and plans for the
construction.
Article VII - CERTIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which is
constructed or substantially improved shall be occupied until a Certificate of Compliance
is issued by the Code Enforcement Officer subject to the following provisions:
A. For New Construction or Substantial Improvement of any elevated structure
the applicant shall submit to the Code Enforcement Officer, an Elevation
Certificate completed by a Professional Land Surveyor, registered professional
engineer, or architect, for compliance with Article VI, paragraphs F, G, or H;
B. The applicant shall submit written notification to the Code Enforcement
Officer that the development is complete and complies with the provisions of this
ordinance;
C. Within 10 working days the Code Enforcement Officer shall:
1. review the Elevation Certificate and the applicant's written notification;
and
2. upon determination that the development conforms with the provisions
of this ordinance, shall issue a Certificate of Compliance.
Article VIII - REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed
developments that require review under other federal law, state law or local ordinances or
regulations and all projects on 5 or more disturbed acres, or in the case of manufactured
home parks divided into 2 or more lots, assure that:
A. All such proposals are consistent with the need to minimize flood damage;
B. All public utilities and facilities, such as sewer, gas, electrical and water
systems are located and constructed to minimize or eliminate flood damages;
C. Adequate drainage is provided so as to reduce exposure to flood hazards;
D. All proposals include base flood elevations, flood boundaries, and, in a
riverine floodplain, floodway data. These determinations shall be based on
engineering practices recognized by the Federal Emergency Management
Agency;
E. Any proposed development plan must include a condition of plan approval
requiring that structures or any lot in the development having any portion of its
land within a Special Flood Hazard Area, are to be constructed in accordance with
Article VI of this ordinance. Such requirement will be included in any deed,
lease, purchase and sale agreement, or document transferring or expressing and
intent to transfer any interest in real estate or structure, including but not limited
to a time-share interest. The condition shall clearly articulate that the
municipality may enforce any violation of the construction requirement and that
fact shall also be included in the deed or any other document previously
described. The construction requirement shall also be clearly stated on any map,
plat, or plan to be signed by the Planning Board or local reviewing authority as
part of the approval process.
Article IX - APPEALS AND VARIANCES
The Board of Appeals of the Town of Norway, may, upon written application of an
aggrieved party, hear and decide appeals where it is alleged that there is an error in any
order, requirement, decision or determination made by, or failure to act by, the Code
Enforcement Officer in the administration or enforcement of the provisions of this
Ordinance.
The Board of Appeals may grant a variance from the requirements of this Ordinance
consistent with state law and the following criteria:
A. Variances shall not be granted within any designated regulatory floodway if any
increase in flood levels during the base flood discharge would result.
B. Variances shall granted only upon:
1. a showing of good and sufficient cause; and
2. a determination that should a flood comparable to the base flood occur, the
granting of a variance will not result in increased flood heights, additional threats
to public safety, public expense, or create nuisances, cause fraud of victimization
of the the public or conflict with existing local laws or ordinances; and
3. a showing that the issuance of the variance with no conflict with other state,
federal or local laws or ordinances; and
4. a determination that failure to grant the variance would result in "undue
hardship", which in this sub-section means:
a. that the land in question cannot yield a reasonable return unless a
variance is granted; and
b. that the need for a variance is due to the unique circumstances of the
property and not to the general conditions in the neighborhood; and
c. that the granting of a variance will not altar the essential character of
the locality; and
d. that the hardship is not the result of action taken by the applicant or a
prior owner.
C. Variances shall only be issued upon a determination that the variance is the minimum
necessary, considering the flood hazard, to afford relief, and the Board of Appeals may
impose such conditions to a variance as it deems necessary.
D. Variances may be issued for new construction, substantial improvements, or other
development for the conduct of a functionally dependent use provided that:
1. other criteria of Article IX and Article VI. K. are met; and
2. the structure or other development is protected by methods that minimize flood
damages during the base flood and create no additional threats to public safety.
E. Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of
Historic Structures upon the determination that:
1. the development meets the criteria of Article IX, paragraphs A. through D.,
above; and
2. the proposed repair, reconstruction, rehabilitation, or restoration will not
preclude the structure's continued designation as a Historic Structure and the
variance is the minimum necessary to preserve the historic character and design
of the structure.
F. Any applicant who meets the criteria of Article IX, paragraphs A. through E., shall be
notified by the Board of Appeals in writing over the signature of the Chairman of the
Board of Appeals that:
1. the issuance of a variance to construct a structure below the base flood level
will result in greatly increased premium rates for flood insurance up to amounts
as high as $25 per $100 of insurance coverage;
2. such construction below the base flood level increases risks to life and
property; and
3. the applicant agrees in writing that the applicant is fully aware of all the risks
inherent in use of land subject to flooding, assumes those risks and agrees to
indemnify and defend the municipality against any claims filed against it that are
related to the applicant's decision to use land located in a floodplain and the the
applicant individually releases the municipality from any claims the applicant
may have against the municipality that are related to the use of land located in a
floodplain.
G. Appeal Procedure for Administrative and Variance Appeals
1. An administrative or variance appeal may be taken to the Board of Appeals by
an aggrieved party within 30 days after receipt of a written decision of the Code
Enforcement Officer;
2. Upon being notified of an appeal, the Code Enforcement Officer shall transmit
to the Board of Appeals all of the papers constituting the record of the decision
appealed from;
3. The Board of Appeals shall hold a public hearing within 35 days of its receipt
of an appeal request;
4. The person filing the appeal shall have the burden of proof;
5. The Board of Appeals shall decide all appeals within 35 days after the close of
the hearing, and shall issue a written decision on all appeals;
6. The Board of Appeals shall submit to the Code Enforcement Officer a report
of all variance actions, including justification for the granting of the variance and
an authorization for the Code Enforcement Officer to issue a Flood Hazard
Permit, which includes any conditions to said permit;
7. Any aggrieved party who participated as a party during the proceedings before
the Board of Appeals may take an appeal to Superior Court in accordance with
State laws within 45 days from the date of any decision of the Board of Appeals.
Article X - ENFORCEMENT AND PENALTIES
A. It shall be the duty of the Code Enforcement Officer to enforce the provisions
of the Ordinance pursuant to Title 30-A MRSA § 4452;
B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any
violation of this Ordinance;
C. In addition to any other actions, the Code Enforcement Officer, upon
determination that a violation exists, shall submit a declaration to the
Administrator of the Federal Insurance Administration requesting a denial of
flood insurance. The valid declaration shall consist of:
1. the name of the property owner and address or legal description of the
property sufficient to confirm its identity or location;
2. a clear and unequivocal declaration that the property is in violation of a
cited State or local law, regulation or ordinance;
3. a clear statement that the public body making the declaration has
authority to do so and a citation to that authority;
4. evidence that the property owner has been provided notice of the
violation and the prospective denial of insurance; and
5. a clear statement that the declaration is being submitted pursuant to
Section 1316 of the National Flood Insurance Act of 1968, as amended.
Article XI - VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of this Ordinance.
Article XII - CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with
any other applicable rule, ordinance, regulation, bylaw, permit, or provision of law.
Where this Ordinance imposes a greater restriction upon the use of land, buildings, or
structures, the provisions of this Ordinance shall control.
Article XIII - DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have
the same meaning as they have at common law and to give this Ordinance its most
reasonable application. Words use in the present tense include the future, the singular
number includes the plural, and the plural includes the singular. The word "may" is
permissive; "shall" is mandatory, and not discretionary.
Accessory Structure - means a small detached structure that is incidental and
subordinate to the principle structure.
Adjacent Grade - means the natural elevation of the ground surface prior to
construction next to the proposed walls of a structure.
Area of Special Flood Hazard - means the land in the floodplain having a one percent
or greater chance of flooding in any given year, as specifically identified in the Flood
Insurance Study cited in Article I of this Ordinance.
Base Flood - means the flood having a one percent chance of being equaled or exceeded
in any given year, commonly called the 100-year flood.
Basement - means any area of building having its floor subgrade (below ground level)
on all sides.
Building - see "Structure"
Certificate of Compliance - A document signed by the Code Enforcement Officer
stating that a structure is in compliance with all of the provisions of this Ordinance.
Code Enforcement Officer - A person certified under Title 30-A MRSA, Section 4451
(including exceptions in subsection 4451, paragraph 1) and employed by a municipality
to enforce all applicable comprehensive planning and land use laws and ordinances.
Development - means any man made change to improved or unimproved real estate,
including but not limited to buildings or other structures, mining, dredging, filling,
grading, paving, excavation, drilling operations or storage of equipment or materials.
Elevated Building - means a non-basement building,
a. built, in the case of a building in Zones AE and A, to have the top of the
elevated floor elevated above the ground level by means of pilings, columns, post,
piers, or "stilts"; and
b. adequately anchored so as not to impair the structural integrity of the building
during a flood of up to one foot above the magnitude of the base flood.
In the case of Zones AE and A, Elevated Building also includes a building elevated by
means of fill or solid foundation perimeter walls with hydraulic openings sufficient to
facilitate the unimpeded movement of flood waters, as required in Article VI. L.
Elevation Certificate - An official form (FEMA Form 81-31, 02/06, as amended) that:
a. is used to verify compliance with with the floodplain management regulations
of the National Flood Insurance Program; and
b. is required for purchasing flood insurance.
Flood or Flooding - means:
a. A general and temporary condition of partial or complete inundation of
normally dry land areas from:
1. The overflow of inland or tidal waters.
2. The unusual and rapid accumulation or runoff of surface waters from
any source.
b. The collapse or subsidence of land along the shore of a lake or body of water
as a result of erosion or undermining caused by waves or currents of water
exceeding anticipated cyclical levels or suddenly caused by an unusually high
water level in a natural body of water, accompanied by a severe storm, or by an
unanticipated force of nature, such as a flood or an abnormal tidal surge, or by
some similarly unusual and unforeseeable event which results in flooding as
defined in paragraph a. 1. of this definition.
Flood Elevation Study - means an examination, evaluation and determination of flood
hazards and, if appropriate, corresponding water surface elevations.
Flood Insurance Rate Map (FIRM) - means an official map of a community, on which
the Federal Insurance Administrator has delineated both the special hazard areas and the
risk premium zones applicable to the community.
Flood Insurance Study - see Flood Elevation Study.
Floodplain Management Regulations - means zoning ordinances, subdivision
regulations, building codes, health regulations, special purpose ordinances (such as a
floodplain ordinance, grading ordinance, and erosion control ordinance) and other
applications of police power. The term describes such state or local regulations, in any
combination thereof, which provide standards for the purpose of flood damage
prevention and reduction.
Flood-proofing - means any combination of structural and non-structural additions,
changes, or adjustments to structures which reduce or eliminate flood damage to real
estate or improved real property, water and sanitary facilities, structures and contents.
Floodway - see "Regulatory Floodway"
Floodway Encroachment Lines - means the lines marking the limits of floodways on
federal, state, and local floodplain maps.
Freeboard - means a factor of safety usually expressed in feet above a flood level for
purposes of action, bridge openings, and the hydrological effect of urbanization of the
watershed, that could contribute to flood heights greater than the height calculated for a
selected size flood and floodway conditions.
Functionally Dependent Use - means a use which cannot perform its intended purpose
unless it is located or carried out in close proximity to water. The term includes only
docking facilities, port facilities that are necessary for the loading and unloading of cargo
or passengers, and ship building and ship repair facilities, but does not include long-term
storage or related manufacturing facilities.
Historic Structure - means any structure that is:
a. Listed individually in the National Historic Register of Historic Places (a
listing maintained by the Department of Interior) or preliminarily determined by
the Secretary of the Interior as meeting the requirements for individual listing on
the National Register;
b. Certified or preliminarily determined by the Secretary of the Interior as
contributing to the historical significance of a registered historic district
preliminarily determined by the Secretary of the Interior to qualify as a registered
historic district;
c. Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior;
or
d. Individually listed on a local inventory of historic places in communities with
historic preservation programs that have been certified either:
1. By an approved state program as determined by the Secretary of the
Interior, or
2. Directly by the Secretary of the Interior in states without approved
programs.
Locally Established Datum - means, for purposes of this ordinance, an elevation
established for a specific site to which all other elevations at the site are referenced. This
elevation is generally not referenced to the National Geodetic Vertical Datum (NGVD) or
any other established datum and is used in areas where Mean Sea Level data is too far
from a specific site to be practically used.
Lowest Floor - means the lowest floor of the lowest enclosed area (including basement).
An unfinished or flood resistant enclosure, usable solely for the parking of vehicles,
building access or storage in an area other than a basement area is not considered a
building's lowest floor, provided that such enclosure is not built so as to render the
structure in violation of the applicable non-elevation design requirements described in
Article VI. L. of this ordinance.
Manufactured Home - means a structure, transportable in one or more sections, which
is built on a permanent chassis and is designed for use with or without a permanent
foundation when connected to the required utilities. For floodplain management
purposes the term "manufactured home" also includes park trailers, travel trailers, and
other similar vehicles placed on a site for greater than 180 consecutive days.
Mean Sea Level - means, for purposes of the National Flood Insurance Program, the
National Geodetic Vertical Datum (NGVD) of 1929, or other datum, to which base flood
elevations shown on a community's Flood Insurance Rate Map are referenced.
Minor Development - means all development that is not new construction or a
substantial improvement, such as repairs, maintenance, renovations, or additions, whose
value is less than 50% of market value of the structure. It also includes, but is not limited
to: accessory structures as provided for in Article VI. J., mining, dredging, filling,
grading, paving, excavation, drilling operations, storage of equipment or materials,
deposition or extraction of materials, public or private sewage disposal systems or water
supply facilities that do not involve structures; and non-structural projects such as
bridges, dams, towers, fencing, pipelines, wharves and piers.
National Geodetic Vertical Datum (NGVD) - means the national vertical datum, whose
standard was established in 1929, which is used by the National Flood Insurance Program
(NFIP). NGVD was based upon mean sea level in 1929 and also has been called "1929
Mean Sea Level (MSL)".
New Construction - means structures for which the "start of construction" commenced
on or after the effective date of the initial floodplain management regulations were
adopted by a community, and includes any subsequent improvements to such structures.
100-year flood - see "Base Flood".
Recreational Vehicle - means a vehicle which is:
a. built on a single chassis;
b. 400 square feet or less when measured at the largest horizontal projection, not
including slide-outs;
c. designed to be self-propelled or permanently towable by a motor vehicle; and
d. not designed for primary use as a permanent dwelling but as temporary living
quarters for recreational use, camping, travel, or seasonal use.
Regulatory Floodway -
a. means the channel of a river or other watercourse and the adjacent land areas
that must be reserved in order to discharge the base flood without cumulatively
increasing the water surface elevation more than one foot, and
b. when not designated on the community's Flood Insurance Rate Map or Flood
Boundary and Floodway Map, it is considered to be the channel of a river or other
watercourse and the adjacent land areas to a distance of one-half the width of the
floodplain, as measured from the normal high water mark to the upland limit of
the floodplain.
Riverine - means relating to, formed by, or resembling a river (including tributaries),
stream, brook, etc.
Special Flood Area - see "Area of Special Flood Hazard".
Start of Construction - means the date the building permit was issued, provided the
actual start of construction, repair, reconstruction, rehabilitation, addition, placement,
substantial improvement or other improvement was within 180 days of the permit date.
The actual start means either the first placement of permanent construction of a structure
on a site, such as the pouring of slab or footings, the installation of piles, the construction
of columns, or any work beyond the stage of excavation; or the placement of a
manufactured home on a foundation. Permanent construction does not include land
preparation, such as clearing, grading and filling; nor does it include the installation of
streets and/or walkways; nor does it include the installation on the property of accessory
buildings, such as garages or sheds not occupied as dwelling units or not part of the main
structure. For a substantial improvement, the actual start of construction means the first
alteration of any wall, ceiling, floor or other structural part of a building, or modification
of any construction element, whether or not that alteration affects the external dimensions
of the building.
Structure - means, for floodplain management purposes, a walled and roofed building.
A gas or liquid storage tank that is principally above ground is also a structure.
Substantial Damage - means damage of any origin sustained by a structure whereby the
cost of restoring the structure to its "before damage" condition would equal or exceed
50% of the market value of the structure before the damage occurred.
Substantial Improvement - means any reconstruction, rehabilitation, addition, or other
improvement of a structure, the cost of which equals or exceeds 50% of the market value
of the structure before the start of construction of the improvement. This term includes
structures which have incurred substantial damage, regardless of the actual repair work
performed. The term, however, does not include:
a. Any project for improvement of a structure to correct existing violations of
state or local health, sanitary, or safety code specifications which have been
identified by the local code enforcement official and which are the minimum
necessary to assure safe living conditions; or
b. Any alteration of a Historic Structure, provided that the alteration will not
preclude the structure's continued designation as a historic structure, and a
variance is obtained from the community's Board of Appeals.
Variance - means a grant of relief by a community from the terms of a floodplain
management regulation.
Violation - means the failure of a structure or development to comply with a
community's floodplain management regulations.
Article XIV - ABROGATION
This ordinance repeals and replaces any municipal ordinance previously enacted to
comply with the National Flood Insurance Act of 1968 (P.L. 90-488, as amended).
60.3 (c&d) Rev. 1/07
Prepared by SPO/fpm/___
( Note: 2 other versions of this ordinance exist in hard copy- one enacted in 1992, and
one in 1999. Both are obsolete, and abrogated by the most recent version above.)