1
Wind Energy Facility Ordinance for Town of Orland, Maine
1.0
Title
2.0
Authority
3.0
Purpose
4.0
Definitions
5.0
Applicability
6.0
Conflict and Severability
7.0
Effective Date
8.0
Classification of Wind Energy Facilities
9.0
Administration
10.0
Application Submission Requirements
11.0
Meteorological Towers (MET Towers)
12.0
General Standards
13.0
Special Standards for Type 1A and 1B Wind Energy Facilities
14.0
Special Standards for Type 2 and Type 3 Wind Energy Facilities
15.0
Mitigation Waivers
16.0
Violations, Complaints, and Enforcement
Appendix A: Application Fees
Appendix B: Type 2 and Type 3 Noise Control Standards
Appendix C: Type 2 and Type 3 Decommissioning Plan Standards
Appendix D: Mitigation Waiver Form
Appendix E: Violation/Complaint Form
2
1.0 Title
This Ordinance shall be known as the Wind Energy Facility Ordinance for Orland, Maine.
2.0 Authority
This Ordinance is adopted pursuant to the enabling provisions of Article VIII, Part 2, Section 1 of
the Maine Constitution; the provisions of 30-A M.R.S.A. § 3001 (Home Rule), and the provisions
of the Planning and Land Use Regulation Act, 30-A M.R.S.A. § 4312, et seq.
3.0 Purpose
The purpose of the Ordinance is to provide for the Construction and operation of Wind Energy
Facilities in Orland, subject to reasonable conditions that will protect the environment and the
public health, safety, and welfare.
4.0 Definitions (For definitions related to noise, see Appendix B, Section E)
Applicant is the legal entity, including successors and assigns, that files an application under this
Ordinance.
Approved Residential Subdivision means a residential subdivision for which all applicable land
use permits have been issued, provided that the time for beginning Construction under such
permits has not expired.
Associated Facilities means elements of a Wind Energy Facility other than its Generating
Facilities that are necessary to the proper operation and maintenance of the Wind Energy
Facility, including but not limited to buildings, access roads, Generator Lead Lines and
substations.
DEP Certification means a certification issued by the Department of Environmental Protection
pursuant to 35-A M.R.S.A. § 3456 for a Wind Energy Development.
Generating Facilities means Wind Turbines and electrical lines, not including Generator Lead
Lines, that are immediately associated with the Wind Turbines.
Generator Lead Line means a "generator interconnection transmission facility" as defined by 35-
A M.R.S.A. § 3132 (1-B).
Historic Area means an Historic Site administered by the Bureau of Parks and Recreation of the
Maine Department of Conservation, with the exception of the Arnold Trail.
Historic Site means any site, structure, district or archaeological site which has been officially
included on the National Register of Historic Places and/or on the Maine Historic Resource
Inventory.
3
Locally-Designated Passive Recreation Area means any site or area designated by a
municipality for passive recreation that is open and maintained for public use and which: a)
has fixed boundaries, b) is owned in fee simple by a municipality or is accessible by virtue of
public easement, c) is identified and described in a local comprehensive plan and, d) has been
identified and designated at least nine months prior to the submission of the Applicant's Wind
Energy Facility permit application.
Meteorological Tower (MET Tower) means a Tower used for the measurement and collection of
wind data that supports various types of equipment, including but not limited to anemometers,
data recorders, and solar power panels. MET Towers may also include wildlife related
equipment such as ANABAT detectors, bird diverts and wildlife entanglement protectors.
Minimum Setback Distance: The Minimum Setback Distance is equal to: 1.5 times the turbine
hub height plus the turbine rotor diameter. (For Type 3 turbines)
Mitigation Waiver means a legally enforceable, written agreement between the Applicant and a
Non-Participating Landowner in which the Non-Participating Landowner waives certain setback,
noise or other protections afforded in the Ordinance.
Municipal Reviewing Authority means the Orland Planning Board.
Nacelle means the frame and housing at the top of the Tower that encloses the gearbox and
generator.
Noise related definitions: See Appendix B, Section E.
Non-Participating Landowner means any landowner, other than a Participating Landowner
whose land is located within Orland.
Occupied Building means a Residence, school, hospital, house of worship, public library or
other building that is occupied or in use as a primary residence or is customarily frequented by
the public at the time when the permit application is submitted.
Participating Landowner means one or more Persons that hold title in fee or a leasehold interest
with sublease rights to property on which Generating Facilities or Associated Facilities are
proposed to be located pursuant to an agreement with the Applicant or an entity that has entered
into an appropriate agreement with the Applicant allowing the Applicant to demonstrate the
requisite right, title and interest in such property.
Person means an individual, corporation, partnership, firm, organization or other legal entity.
Planned Residence means a Residence for which all applicable building and land use permits
have been issued, provided that the time for beginning Construction under such permits has not
expired.
4
Protected Location means any location that is:
1) accessible by foot, on a parcel of land owned by a Non-Participating Landowner containing
a Residence or Planned Residence, or an approved residential subdivision, house of
worship, academic school, college, library, duly licensed hospital or nursing home near the
development site at the time an application for a Wind Energy Facility is submitted under this
Ordinance; or
2) a hotel, motel, campsite or duly licensed campground that the Orland Planning Board has
designated a Protected Location after making a determination that the health and welfare of
the guests or the economic viability of the establishment will be unreasonably impacted by
noise in excess of that allowed under section 13.1.3(b).
For purposes of this definition, (1) a Residence is considered planned when the owner of the
parcel of land on which the Residence is to be located has received all applicable building and
land use permits and the time for beginning Construction under such permits has not expired, and
(2) a residential subdivision is considered approved when the developer has received all
applicable land use permits for the subdivision and the time for beginning Construction under such
permits has not expired.
Residence means a building or structure, including manufactured housing, maintained for
permanent or seasonal residential occupancy providing living, cooking and sleeping facilities and
having permanent indoor or outdoor sanitary facilities, excluding recreational vehicles, tents and
watercraft.
Scenic Resource means either a Scenic Resource of state or national significance, as defined in
35-A M.R.S § 3451(9) or a scenic resource of local significance located within Orland or an
abutting municipality and identified as such in a comprehensive plan, open space plan or scenic
inventory adopted by the Town of Orland or an abutting municipality. For the purposes of this
Ordinance, the Great Pond Mountain Conservation Trust's "Wildlands" is a Scenic Resource.
Shadow Flicker means alternating changes in light intensity caused by the movement of Wind
Turbine blades casting shadows on the ground or a stationary object.
Short Duration Repetitive Sounds means a sequence of repetitive sounds which occur more than
once within an hour, each clearly discernible as an event and causing an increase in the Sound
Level of at least 6 dBA on the fast meter response above the Sound Level observed immediately
before and after the event, each typically less than ten seconds in duration, and which are
inherent to the process or operation of the development and are foreseeable.
Sight Line Representation means a profile drawing showing prominent features, including but not
limited to topography, buildings, and trees, along and in relation to a line of sight extending from
an observer's eye to the lowest point visible on a proposed Tower.
5
Significant Wildlife Habitat means a Significant Wildlife Habitat as defined in 38 M.R.S.A. § 480-
B(10).
Substantial Start means that Construction shall be considered to be substantially commenced
when any work beyond excavation, including but not limited to, the pouring of a slab or footings,
the installation of piles, the Construction of columns, or the placement of a Tower on a
foundation has begun. Purchase of wind turbines and/or associated equipment shall not
constitute a Substantial Start unless the wind turbines and/or associated equipment is physically
located in the Town of Orland such that it is taxable by the Town of Orland.
Tower means the free-standing structure on which a wind measuring or Generating Facility is
mounted.
Turbine Height means the distance measured from the surface of the Tower foundation to the
highest point of any turbine rotor blade measured at the highest arc of the blade.
Wind Energy Facility means a facility that uses one or more Wind Turbines to convert wind
energy to electrical energy. A Wind Energy Facility includes Generating Facilities and
Associated Facilities.
Wind Energy Facility, Type 1A means a Wind Energy Facility having a maximum generating
capacity of less than 100kW and a maximum Turbine Height of 80 feet.
Wind Energy Facility, Type 1B means a Wind Energy Facility having a maximum generating
capacity of less than 100kW and either more than one Wind Turbine, or one or more Wind
Turbines with a Turbine Height greater than 80 feet.
Wind Energy Facility, Type 2 means a Wind Energy Facility having a maximum generating
capacity of 100 kW or greater and which does not require a state permit issued by the
Department of Environmental Protection under the Site Location of Development Act, 38
M.R.S.A. §481, et seq.
Wind Energy Facility, Type 3 means a Wind Energy Facility having a generating capacity of
100kW or greater and which requires a state permit issued by the Department of Environmental
Protection under the Site Location of Development Act, 38 M.R.S.A. §481, et seq.
Wind Turbine means a system for the conversion of wind energy into electricity which is
comprised of a Tower, generator, Nacelle, rotor and transformer.
Additional terms not defined in this section or in Appendix B, Section E shall be defined as
provided in 35-A MRSA § 3451. If not defined in 35-A MRSA § 3451, such additional terms shall
be given their customary definition within the wind energy industry, or their usual and ordinary
dictionary definition.
6
5.0 Applicability
5.1
This Ordinance applies to any Wind Energy Facility proposed for Construction in Orland after
the effective date of this Ordinance. This Ordinance does not apply to Associated Facilities
unless the Generating Facilities are located within Orland, in which case this Ordinance
applies to both the Generating Facilities and the Associated Facilities.
5.1
A Wind Energy Facility that is the subject of an application determined to be complete by the
Orland Planning Board prior to the effective date of this Ordinance shall not be required to
meet the requirements of this Ordinance; provided that any physical modifications after the
effective date of the Ordinance shall be subject to the permitting requirements of Section 9.1.
5.3
Standards in this Ordinance regarding setbacks, Noise, Shadow Flicker, and Mitigation
Waivers shall apply to all locations affected by Wind Energy Facilities located in Orland
regardless of whether the affected location is located in Orland or located in an abutting
municipality.
6.0
Conflict and Severability
6.1
If there is a conflict between provisions in this Ordinance, the more stringent shall apply. If
there is a conflict between a provision in this Ordinance and that of another Orland ordinance,
the provision of this Ordinance shall apply.
6.2
The invalidity of any part of this Ordinance shall not invalidate any other part of this
ordinance.
6.3 Certain provisions in this Ordinance vary from similar provisions in State of Maine
recommendations for Wind Energy Facilities. If there is a conflict between a provision in this
ordinance and State recommendations, the provision of this ordinance shall apply.
7.0 Effective Date
This Ordinance becomes effective March 15, 2011.
7
8.0 Classification of Wind Energy Facilities
All Wind Energy Facilities shall be classified in accordance with Table 1 below:
Table 1: Classification of Wind Energy Facilities and
Corresponding Local Review and Approval Authority
Facility Aggregate Turbine Max. # of DEP Site Location Local Review
Type Capacity Height Turbines Permit Required
and Approval
1A
<100 kW
< 80'
NA
No
Orland
Planning Board
1B
<100 kW
> 80'
NA
No
Orland
Planning Board
2
≥100 kW
NA
NA
No 1
Orland
Planning Board
3
≥ 100 kW
NA
NA
Yes 2
Orland
Planning Board
1
Per 35-A MRS §3456. DEP Certificate required if energy generated is for sale or use by a Person other than the generator.
2
Per 38 MRS §482(2)
8
9.0 Administration
9.1 Review and Approval Authority
1.
The Orland Planning Board is authorized to review all applications for Type 1A, Type
1B, Type 2, and Type 3 Wind Energy Facilities and MET Towers and may approve,
deny or approve such applications with conditions in accordance with this Ordinance.
9.2 Permit Required
1.
No Wind Energy Facility shall be constructed or located within Orland without a permit
issued in accordance with this Ordinance.
2.
Any physical modification to an existing Wind Energy Facility that materially alters the
location or increases the area of development on the site or that increases the Turbine
Height or the level of sound emissions of any Wind Turbine shall require a permit
modification under this Ordinance. Like-kind replacements and routine maintenance
and repairs shall not require a permit modification. Replacement of a Wind Turbine
with another Wind Turbine of greater rated generating capacity shall not be deemed a
like-kind replacement.
9.3
Permit Applications
1.
Application components. A Wind Energy Facility permit application shall consist of the
application form, application fee, and supporting documents, as described below:
a. Application Forms. The Town of Orland shall provide the application form which
shall be signed by: 1) a Person with right, title and interest in the subject property
or; 2) a Person having written authorization to act as an agent from a Person with
right, title and interest in the subject property. The signature shall be dated and the
signatory shall certify that the information in the application is complete and correct
and that the proposed facility will be constructed and operated in accordance with
the standards of this ordinance and all approval and permit conditions, if any.
b. Application Fees. Application fees shall be assessed and paid upon submission of
the application in accordance with Appendix A of this Ordinance.
c. Supporting Documents. The application shall include all additional documents
necessary to satisfy the applicable submission requirements under section 10 of
this Ordinance.
9
2.
Application Submission. The Applicant shall submit nine printed copies and one
electronic copy of its application for a Wind Energy Facility permit to the Orland
Planning Board who shall note on the application the date on which it was received.
3.
Changes to a Pending Application
a. The Applicant shall promptly notify the Orland Planning Board of any changes the
Applicant proposes to make to information contained in the application.
b. If changes are proposed to a pending application after a public hearing has been
held, the Orland Planning Board may consider those changes and continue with
the review and approval process without a renewed public hearing if it determines
that the changes do not materially alter the application. If the Orland Planning
Board determines that the proposed changes do materially alter the application it
shall schedule and conduct another public hearing within 30 days of that
determination. In making its determination, the Orland Planning Board shall
consider whether the proposed changes involve potential adverse effects different
than or in addition to those addressed in the initial application.
9.4
Permit Application Procedures
1.
Type 1A Wind Energy Facility Application
a. Within 10 days after receiving an application, the Orland Planning Board shall
notify the Applicant in writing either that the application is complete or, if the
application is incomplete, the specific additional material needed to complete the
application. The Orland Planning Board may waive any submission requirement if
the Orland Planning Board issues a written finding that, due to special
circumstances of the application, adherence to that requirement is not necessary to
determine compliance with the standards of this Ordinance.
b. Within 30 days after determining the application to be complete, the Orland
Planning Board shall issue a written order: 1) denying approval of the proposed
Wind Energy Facility, 2) granting approval of the proposed Wind Energy Facility or,
3) granting approval of the proposed Wind Energy Facility with conditions. In
making the decision, the Orland Planning Board shall make findings on whether the
proposed Wind Energy Facility meets the applicable criteria described in sections
12 and 13.
c. With the agreement of the Applicant, the Orland Planning Board may extend the
procedural time frames of this section.
10
2.
Type 1B, Type 2 and Type 3 Wind Energy Facility Applications
a. The Applicant is strongly encouraged to meet with the Code Enforcement Officer
before submitting an application. At this pre-application meeting, the Code
Enforcement Officer will explain the Ordinance's provisions, application forms, and
submission requirements. The Applicant should provide photos of the proposed
site and written descriptions of the proposed facility and the proposed site,
including its location and lot area.
b. An application shall be eligible for consideration at a regularly-scheduled meeting
of the Orland Planning Board only if the Applicant submits it at least 14 days prior
to the meeting.
c. Within 30 days after receipt of the application by the Orland Planning Board the
Orland Planning Board shall notify the Applicant in writing either that the application
is complete or, if the application is incomplete, the specific additional material
needed to complete the application. The Orland Planning Board may waive any
submission requirement if it issues a written finding that, due to special
circumstances of the application, adherence to that requirement is not necessary to
determine compliance with the standards of this Ordinance.
d. The Orland Planning Board shall hold a public hearing for a Type 2 or Type 3 Wind
Energy Facility application within 60 days after determining that the application is
complete. The Orland Planning Board may decide to hold a public hearing for a
Type 1B Wind Energy Facility application. If it decides to hold a public hearing for
a Type 1B application, the Orland Planning Board shall hold that hearing within 30
days after determining that the application is complete. Once convened, a public
hearing may be continued to additional date(s), as needed, to assure a complete
review of the application.
e. Within 60 days after determining that an application for a Type 1B Wind Energy
Facility is complete or within 60 days after the close of the public hearing for a Type
2 or Type 3 Wind Energy Facility, the Orland Planning Board shall issue a written
order: 1) denying approval of the proposed Wind Energy Facility, 2) granting
approval of the proposed Wind Energy Facility or, 3) granting approval of the
proposed Wind Energy Facility with conditions. In making its decision, the Orland
Planning Board shall make findings on whether the proposed Wind Energy Facility
meets the applicable criteria described in sections 12, 13, and 14.
f. With the agreement of the Applicant, the Orland Planning Board may extend the
procedural time frames of this section.
11
Table 2:
Procedural Time Frames
Facility
Application
Public
Final
Type
Completeness
Hearing
Decision
1A
<10 days 1
NA
<30 days 2
1B
<30 days 1
<30 days 2
<60 days 2
2
<30 days 1
<60 days 2
<60 days 3
3
<30 days 1
<60 days 2
<60 days 3
1
Days after receipt of the application by the Orland Planning Board
2
Days after the application is determined to be complete
3
Days after the close of the public hearing
9.5
Notice of Meetings
Ten days prior to the first meeting at which an application for any Wind Energy Facility is to
be considered, the Orland Planning Board shall send notice by first class mail, to the
Applicant and all owners of property abutting the property on which the Wind Energy Facility
is proposed to be located. For Type 2 and Type 3 facilities notice shall also be sent to
officer(s) of abutting municipalities. The notice shall state the date, time and place of the
meeting and the proposed location and the classification of the proposed Wind Energy
Facility. The cost of sending the required notices shall be borne by the Applicant.
9.6 Public Hearings
The Orland Planning Board shall have notice of the date, time, and place of any public
hearing and the proposed location and the classification of the proposed Wind Energy
Facility:
1. Published at least once in a newspaper having general circulation within the
municipality. The date of the first publication shall be at least 10 days before the
hearing. The cost of publishing the notice shall be borne by the Applicant.
2.
For Type 1A and Type 1B Facilities: Mailed by certified mail, return receipt to the
Applicant and to owners of property within 1000 feet of the property on which the Wind
Energy Facility is proposed to be located, at least 10 days before the public hearing.
The Orland Planning Board shall maintain a list of property owners to whom notice is
mailed in the application file. Failure of any of these property owners to receive a
notice shall not invalidate the public hearing, nor shall it require the Orland Planning
Board to schedule another hearing. The cost of sending the required notices shall be
borne by the Applicant.
12
For Type 2 and Type 3 Facilities: Mailed by certified mail, return receipt to the
Applicant and to owners of property in the Town of Orland within one mile of the
property on which the Wind Energy Facility is proposed to be located, at least 10 days
before the public hearing. Notice shall also be sent to officer(s) of abutting
municipalities. The Orland Planning Board shall maintain a list of property owners to
whom notice is mailed in the application file. Failure of any of these property owners to
receive a notice shall not invalidate the public hearing, nor shall it require the Orland
Planning Board to schedule another hearing. The cost of sending the required
notices shall be borne by the Applicant.
9.7 Professional Services
In reviewing the application for compliance with this Ordinance, the Orland Planning Board
may retain professional services, including but not limited to those of an attorney or
consultant, to verify information presented by the Applicant. The attorney or consultant shall
first estimate the reasonable cost of such review and the Applicant shall deposit, with the
Town of Orland, the full estimated cost, which the Town of Orland shall place in an escrow
account. The Town of Orland shall pay the attorney or consultant from the escrow account
and reimburse the Applicant if funds remain after payment.
9.8
Expiration of Permits
Permits shall expire: 1) two years after the date of approval unless a Substantial Start on
Construction has occurred and; 2) three years after the date of approval unless Construction
of the Wind Energy Facility has been completed. If a permit for a Type 2 or Type 3 Wind
Energy Facility expires, the Applicant shall implement pertinent provisions of the approved
decommissioning plan. Upon the Applicant's written request, the Orland Planning Board may
extend either or both expiration time limits by one year.
9.9
Access
The Code Enforcement Officer shall have access to the site at all times to review the
progress of the work and shall have the authority to review all records and documents directly
related to the design, Construction and operation of the facility.
13
9.10 Enforcement
1.
It shall be unlawful for any Person to violate or fail to comply with or take any action
that is contrary to the terms of the Ordinance, or to violate or fail to comply with any
permit issued under the Ordinance, or to cause another to violate or fail to comply or
take any action which is contrary to the terms of the Ordinance or any permit under the
Ordinance.
2.
If the Code Enforcement Officer or other Person charged with enforcement of
municipal laws of the Town of Orland determines that a violation of the Ordinance or
the permit has occurred, the Code Enforcement Officer shall provide written notice to
any Person alleged to be in violation of this Ordinance or permit. If the alleged violation
does not pose an immediate threat to public health or safety, the Code Enforcement
Officer and the alleged violator shall engage in good faith negotiations to resolve the
alleged violation. Such negotiations shall be conducted within thirty (30) days of the
notice of violation and, with the consent of the alleged violator, may be extended.
3.
If, after thirty (30) days from the date of notice of violation or further period as agreed
to by the alleged violator, the Code Enforcement Officer determines, in the officer's
reasonable discretion, that the parties have not resolved the alleged violation, the
Town of Orland may institute civil enforcement proceedings or any other remedy at law
to ensure compliance with the Ordinance or permit. Violators shall pay to the Town all
attorney's fees, court costs and out-of-pocket expenses incurred by the Town in any
enforcement action undertaken to correct a violation of this Ordinance.
9.11 Appeals
The applicant or any other party aggrieved by a decision of the Orland Planning Board on a Wind
Energy Facility application may appeal to the Maine Superior Court in accordance with Rule
80(B), Maine Rules of Civil Procedure, within thirty (30) days after the date of the Planning
Board's final written decision.
14
Application Submission Requirements
10.1 General Submission Requirements
1.
A completed application form including:
a. The Applicant and Participating Landowner(s') name(s) and contact information.
b. The address, tax map and lot number, zone (if applicable) and owner(s) of the
proposed facility site and any contiguous parcels owned by Participating
Landowners.
c. The tax map and lot number, current use, owner(s) and addresses of owner(s) of
parcels that abut the proposed facility site or abut parcels of Participating
Landowners that are contiguous with the proposed facility site
d. An affirmation, signed and dated by the Applicant, that the information provided in
the application is correct and that the proposed Wind Energy Facility, if approved
and built, shall be constructed and operated in accordance with the standards of
this ordinance and all conditions of approval, if any
2.
Receipt showing payment of application fee in accordance with Appendix A.
3.
A copy of a deed, easement, purchase option or other comparable documentation
demonstrating that the Applicant has right, title or interest in the proposed facility site.
4.
Location map showing the boundaries of the proposed facility site and all contiguous
property under total or partial control of the Applicant or Participating Landowner(s)
and any Scenic Resource or Historic Site within 2640 feet (½ mile) of the proposed
development.
5.
Description of the proposed Wind Energy Facility that includes the number and
aggregate generating capacity of all Wind Turbines, the Turbine Height and
manufacturer's specifications for each Wind Turbine (including but not limited to the
make, model, maximum generating capacity, sound emission levels and types of
overspeed controls) and a description of Associated Facilities.
6.
Site plan showing the proposed location of each Wind Turbine and Associated
Facilities and any of the following features located within 500 feet of any Type 1A or
Type 1B Wind Turbine, or within 1000 feet of any Type 2 Wind Turbine, or within 2640
feet (½ mile) of any Type 3 Wind Turbine: parcel boundaries, required setbacks,
topographic contour lines (maximum 20-foot interval), roads, rights-of-way, overhead
utility lines, buildings (identified by use), land cover, wetlands, streams, water bodies
and areas proposed to be re-graded or cleared of vegetation.
a. In addition to the information in 6, above, site plans for Type 1B, Type 2 and Type
3 Wind Energy Facilities shall show the location and average height of tree cover to
15
be retained and the location, variety, planting height and mature height of proposed
trees, if any.
7.
Written evidence that the Environmental Coordinator of the Maine Department of
Inland Fisheries and Wildlife (MDIFW) and that the Maine Natural Areas Program
(MNAP) have both been notified of the pending application and the location and
Turbine Height of all proposed Wind Turbines. The Applicant will also solicit review
comments from the Maine Department of Inland Fisheries and Wildlife (MDIFW) and
the Maine Natural Resources Area Program (MNAP) and provide those comments to
the Orland Planning Board.
8.
Written evidence that the provider of electrical service to the property has been notified
of the intent to connect an electric generator to the electricity grid, if such connection is
proposed.
9.
Description of Emergency and normal shutdown procedures.
10.
Photographs of existing conditions at the site.
11.
An application for a Type 1A or 1B Wind Energy Facility shall include structural
drawings of the Tower foundation and anchoring system: a) prepared by the Wind
Turbine or Tower manufacturer, b) prepared in accordance with the manufacturer's
specifications or, c) prepared and stamped by a Maine-licensed professional engineer.
12.
An application for a Type 1A or Type 1B Wind Energy Facility shall include:
a. a written statement, signed by the Applicant, that certifies that the proposed facility
is designed to meet the applicable noise control standards under section 13.1.3
and acknowledges the Applicant's obligation to take remedial action in accordance
with section 13.1.6 if the Code Enforcement Officer determines those standards
are not being met or;
b. a written request for review under section 14.1 along with information required
under Appendix B, subsection B (Submissions).
13.
An Application for Type 1B, Type 2 or Type 3 Wind Energy Facility shall include the
following site line, photographic and, if applicable, screening information, provided
that an Applicant for a Type 3 Wind Energy Facility may provide this information as
part of a visual assessment if required pursuant to section 14.6:
a. Sight Line Representations of each Wind Turbine from all Occupied Buildings and
Scenic Resources within 3000 feet of the Wind Turbine. Each Sight Line
Representation shall be drawn at a scale sufficiently large to make it legible. If
screening is proposed, the proposed screening device, such as trees, shrubs or
fencing, shall be depicted on the drawing along with the sight line as altered by the
screening.
16
b. A current four-inch by six-inch color photograph of the proposed site of the Wind
Turbine(s) taken from viewpoints corresponding to each of the Site Line
Representations.
c. One copy of each of the photographs described in b, above, onto which is
superimposed an accurately-scaled and sited representation of the Wind
Turbine(s).
14. An application for a Type 2 Wind Energy Facility that generates energy primarily for
sale or use by a Person other than the generator, shall include, if issued at the time of
application, certification from the Department of Environmental Protection pursuant to
35-A M.R.S.A. § 3456 that the Wind Energy Facility:
a. Will meet the requirements of the noise control rules adopted by the Board of
Environmental Protection pursuant to the Site Location of Development Act, 38
M.R.S.A. §481, et seq. ;
b. Will be designed and sited to avoid unreasonable adverse Shadow Flicker effects;
and
c. Will be constructed with setbacks adequate to protect public safety
If such certification has not been issued at the time of application, the Applicant shall
include written evidence that the Applicant has applied for certification.
10.2 Additional Submission Requirements for an Application for a Type 2 and 3 Wind Energy
Facility
1.
Certificates of design compliance obtained by the equipment manufacturers from
Underwriters Laboratories, Det Norske Veritas, or other similar certifying
organizations.
2.
Decommissioning plan in conformance with Appendix C.
3.
Written summary of operation and maintenance procedures for the Wind Energy
Facility and a maintenance plan for access roads, erosion and sedimentation controls
and storm water management facilities.
4.
Standard boundary survey of the subject property stamped by a Maine-licensed
surveyor. The Orland Planning Board may waive this requirement if it determines that
the Applicant has provided information sufficient to identify property boundaries to the
extent necessary.
5.
Visual impact assessment, if required pursuant to section 14.6.
6.
Stormwater management plan stamped by a Maine-licensed professional engineer.
7.
Sound Level analysis, prepared by a qualified engineer, which addresses the
standards of section 14.1.
17
8.
Shadow Flicker analysis based on WindPro or other modeling software approved by
the Department of Environmental Protection.
9.
Foundation and anchoring system drawings that are stamped by a Maine-licensed
professional engineer.
10.
Provide a site plan identifying current land uses, dwellings, and natural resource
features identified by the Maine Department of Inland Fisheries and Wildlife and the
Maine Natural Areas Program within 2640 feet (½ mile) of the project boundaries.
(Type 2 and Type 3 facilities only)
11.
Provide a blasting plan to include a pre-blast survey for any structures and bedrock
wells located within 2000 feet of any blasting operations.
12.
Provide data and mapping on wind resources and speeds in the project area to
demonstrate that sufficient wind resources exist for a feasible wind project. (Type 2
and Type 3 facilities only)
13. Written documentation that the Wind Energy Facility lighting complies with the
requirements of Section 12.10.2.
14.
Other relevant studies, reports, certifications and approvals as may be reasonably
requested by the Orland Planning Board to ensure compliance with this Ordinance.
10.3 If a Wind Energy Facility project is to be constructed partially in Orland and partially in an
abutting municipality, the following submissions must represent the entire project:
10.3.1 The Location Map required by section 10.1.4.
10.3.2 The Description required by section 10.1.5.
10.3.3 The Site Plan required by section 10.1.6.
10.3.4 The Site Plan required by section 10.2.10 (for Type 2 and Type 3 Facilities)
10.4 If a Wind Energy Facility project is to be constructed partially in Orland and partially in an
abutting municipality, the property information required by sections 10.1.1(b) and 10.1.1(c)
must be submitted for properties in abutting municipalities within 2640 feet (½ mile) of the
Orland town line.
11.0 Meteorological Towers (MET Towers)
Applications for Meteorological (MET) Towers shall be subject to the submission and review
standards for a Type 1A Wind Energy Facility, as applicable, except that no height limitation shall
apply. A permit for a MET Tower shall be valid for 2 years and 2 months from the date of
issuance. The Orland Planning Board may grant one or more one-year extensions of this permit
period. Within 30 days following removal of a MET Tower, the Applicant shall restore the site to
its original condition to the extent practicable. The provisions of this section do not apply to
permanent MET Towers included as Associated Facilities in approved Wind Energy Facility
applications.
18
12.0 General Standards
12.1 Natural Resource Protection
A Wind Energy Facility shall not have an unreasonable adverse effect on rare, threatened, or
endangered wildlife, Significant Wildlife Habitat, rare, threatened or endangered plants and
rare and exemplary plant communities. In making its determination under this subsection, the
Orland Planning Board shall consider pertinent application materials and the written
comments and/or recommendations, if any, of the Maine Department of Inland Fisheries and
Wildlife (MDIFW) Environmental Coordinator and the Maine Natural Areas Program (MNAP).
12.2 Building Permit
All components of the Wind Energy Facility shall conform to relevant and applicable local and
state building codes.
12.3 Overspeed Controls and Brakes
Each Wind Turbine shall be equipped with an overspeed control system that: 1) includes both
an aerodynamic control such as stall regulation, variable blade pitch, or other similar system,
and a mechanical brake that operates in fail safe mode; or 2) has been designed by the
manufacturer or a licensed engineer and found by the Orland Planning Board based on its
review of a written description of the design and function of the system, to meet the needs of
public safety.
12.4 Electrical Components and Interconnections
All electrical components of the Wind Energy Facility shall conform to relevant and applicable
local, state, and national codes.
12.5 Access
All ground-mounted electrical and control equipment and all access doors to a Wind Turbine
shall be labeled and secured to prevent unauthorized access. A Wind Tower shall not be
climbable up to a minimum of fifteen (15) feet above ground surface.
12.6 Blade Clearance
The minimum distance between the ground and all blades of a Wind Turbine shall be 25 feet
as measured at the lowest arc of the blades.
12.7 Signal Interference
The Applicant shall make reasonable efforts to avoid and mitigate to the extent practicable
any disruption or loss of radio, telephone, television, or similar signals caused by the Wind
Energy Facility.
12.8 Structure Type
19
With the exception of Meteorological (MET) Towers, Towers shall be monopoles with no guy
wires. This requirement may be waived if the Applicant demonstrates to the satisfaction of the
Orland Planning Board that there is no practicable alternative. Bird flight diverters must be
installed on any guy wires that are permitted.
12.9 Erosion Control
Erosion of soil and sedimentation shall be minimized by employing "best management
practices" in the "Maine Erosion & Sediment Control Handbook for Construction: Best
Management Practices", Maine DEP, March 2003, as amended.
12.10 Visual Appearance
1.
A Wind Turbine shall be a non-obtrusive color such as white, off-white or gray, or as
may otherwise be required by another governmental agency with jurisdiction over the
Wind Energy Facility.
2.
A Wind Turbine shall not be lighted artificially, except to the extent consistent with
Federal Aviation Administration requirements or other applicable authority that
regulates air safety or as is otherwise required by another governmental agency with
jurisdiction over the Wind Energy Facility.
3.
A Wind Turbine shall not be used to support signs and shall not display advertising
except for reasonable and incidental identification of the turbine manufacturer, facility
owner and operator, and for warnings.
12.11 Visibility of Wind Turbine
The following requirements apply, to the extent practicable, to Type 1B and Type 2 Wind
Energy Facilities:
1.
To the extent that doing so does not inhibit adequate access to the wind resource,
each Wind Turbine shall be located to maximize the effectiveness of existing
vegetation, structures and topographic features in screening views of the Wind Turbine
from Occupied Buildings and Scenic Resources.
2.
When existing features do not screen views of a Wind Turbine from Residences and
Scenic Resources, screening may be required, where feasible and effective, through
the planting of trees and/or shrubs. In order to maximize the screening effect and
minimize wind turbulence near the Wind Turbine, plantings should be situated as near
as possible to the point from which the Wind Turbine is being viewed. Such plantings
shall be of native varieties existing in the area of the plantings.
3.
If the plantings are to be on the property of the owner of an Occupied Building in an
area where native vegetation has already been removed or substantially disrupted, the
owner may request that the applicant use non-native ornamental plantings. Actual use
of the requested plantings is at the discretion of the Applicant.
13.0 Special Standards for Type 1A and Type 1B Wind Energy Facilities
20
13.1 Noise emanating from a Type 1A or Type1B Wind Energy Facility shall be controlled in
accordance with the provisions of this section or, upon the written request of the Applicant,
the provisions of section 14.1. If the Applicant chooses review under section 14.1, the
provisions of 13.1.1, 13.1.2 and 13.1.6 shall apply, but the provisions of 13.1.3, 13.1.4 and
13.1.5 shall not apply.
1.
The Sound Level limits contained in this section apply only to areas that are defined as
Protected Locations and to property boundaries that describe the outer limits of the
facility site in combination with any parcel(s) owned by a Participating Land-Owner that
are contiguous with the facility site .
2.
The Sound Level limits contained in this section do not apply to the facility site or any
parcel(s) owned by a Participating Land-Owner that are contiguous with the facility
site.
3.
The Sound Levels resulting from Routine Operation of a Wind Energy Facility, as
measured in accordance with the procedures described in section 13.1.5 shall not
exceed the limits specified for the following locations and times:
a. At a Protected Location with no living and sleeping quarters:
55 dBA during the Protected Location's regular hours of operation
b. At a Protected Location with living and sleeping quarters:
1. Area(s) within 500 feet of living and sleeping quarters:
45 dBA between 7:00 p.m. and 7:00 a.m.
55 dBa between 7:00 a.m. and 7:00 p.m.
2. Area(s) more than 500 feet from living and sleeping quarters:
55dBA at all times.
21
c. At property boundaries that describe the outer limits of the facility site combined
with any parcel(s) owned by a Participating Land-Owner that are contiguous with
the facility site:
65 dBA at all times.
4.
If the Applicant submits the certification and acknowledgement required by Section
10.1.12(a), the Orland Planning Board, for purposes of issuing its approval, that the
pertinent sound-level limits under section 13.1.1 have been met, subject to the
Applicant's obligation to take remedial action as necessary under section 13.1.6.
5.
The Code Enforcement Office may perform measurements of Sound Levels resulting
from Routine Operation of an installed Type 1A or Type 1B Wind Energy Facility at the
officer's own initiative or in response to a noise-related complaint to determine
compliance with the pertinent standards in section 13.1.1. Such measurements shall
be performed as follows:
a. Measurements shall be obtained during representative weather conditions when
the sound of the Wind Energy Facility is most clearly noticeable. Preferable
weather conditions for sound measurements at distances greater than about 500
feet from the sound source include overcast days when the measurement location
is downwind of the Wind Turbine and inversion periods (which most commonly
occur at night).
b. Sound Levels shall be measured at least four (4) feet above the
ground by a meter set on the A-weighted response scale, fast response. The
meter shall meet the latest version of American National Standards Institute (ANSI
S1.4.) "American Standard Specification for General Purpose Sound Level Meters"
and shall have been calibrated at a recognized laboratory within the past year.
c. 5 dBA shall be added to Sound Levels of any Short Duration Repetitive Sound
measured in accordance with paragraphs a and b.
6.
The Applicant shall operate the proposed Wind Energy Facility in conformance with
the Sound Level limits of section 13.1 or section 14.1, as applicable. If, based on post-
installation measurements taken in accordance with section 13.1.5 or section 14.1, as
applicable, the Code Enforcement Officer determines that the applicable sound-level
limits are not being met, the Applicant shall, at the Applicant's expense and in
accordance with the Orland Wind Energy Facility Ordinance and in consultation with
the Code Enforcement Officer, take remedial action deemed necessary by the Code
Enforcement Officer to ensure compliance with those limits. Remedial action that the
Code Enforcement Officer may require, includes, but shall not be limited to, one or
more of the following:
a. modification or limitation of operations during certain hours or wind conditions;
22
b. maintenance, repair, modification or replacement of equipment;
c. relocation of the Wind Turbine(s); and,
d. removal of the Wind Turbine(s) provided that the Code Enforcement Officer may
require removal of the Wind Turbine(s) only if the Code Enforcement Officer
determines that there is no practicable alternative.
13.2 Setbacks
Wind Turbines shall be set back a horizontal distance equivalent to 150% of the Turbine
Height from property boundaries, public and private rights-of-way and overhead utility lines
that are not part of the proposed Generating Facility except that the Orland Planning Board
may allow a reduced setback if the Applicant submits, in writing: a waiver of the property
boundary setback signed by the pertinent abutting landowner. (See Section 15.0 - Mitigation
Waivers)
13.3 Discontinued Use
1.
A Type 1A or Type 1B Wind Energy Facility that is not generating electricity for twelve
(12) consecutive months shall be deemed a discontinued use and shall be removed
from the property by the Applicant within 120 days of receipt of notice from the Code
Enforcement Officer, unless the Applicant provides information that the Orland
Selectmen deem sufficient to demonstrate that the project has not been discontinued
and should not be removed. If the Wind Energy Facility is not removed within this time
period, the municipality may remove the turbine at the Applicant's expense. The
Applicant shall pay all site reclamation costs deemed necessary and reasonable to
return the site to its pre-construction condition, including the removal of roads and
reestablishment of vegetation.
2.
If a surety has been given to the municipality for removal of a Type 1B Wind Energy
Facility, the Applicant may apply to the Orland Selectmen for release of the surety
when the Wind Energy Facility has been removed to the satisfaction of the Code
Enforcement Officer.
14.0 Special Standards for Type 2 and Type 3 Wind Energy Facilities
14.1 Control of Noise
Noise emanating from a Type 2 Wind Energy Facility, a Type 3 Wind Energy Facility, or,
upon written request of the Applicant pursuant to section 13.1, a Type 1A or Type 1B Wind
Energy Facility shall be controlled in accordance with the provisions of Appendix B
If there is a conflict between a provision of Appendix B and another provision of this
ordinance, the provision of Appendix B shall apply.
23
Non-participating Landowners may waive these noise restrictions with a written Mitigation
Waiver. (See Section 15.0 - Mitigation Waivers)
24
14.2 Setbacks
1. For Type 2 Wind Turbines: Wind Turbines shall be set back a horizontal distance
equivalent to the Minimum Setback Distance from property boundaries, public and private
rights-of-way and overhead utility lines that are not part of the proposed Generating
Facility except that the Orland Planning Board may allow a reduced setback if the
Applicant submits, in writing: a waiver of the property boundary setback signed by the
pertinent abutting landowner. (See Section 15.0 - Mitigation Waivers) A waiver of the
setback to public or private rights-of-way and overhead utility lines may be granted by the
Planning Board if the Applicant submits a report by a qualified third-party engineer
reasonably acceptable to the Orland Planning Board that demonstrates, to the satisfaction
of the Orland Planning Board, that a reduced setback to public or private rights-of-way or
overhead utility lines will not adversely impact the public safety and welfare.
The Minimum Setback Distance is equal to: 1.5 times the turbine hub height plus the
turbine rotor diameter.
2. For Type 3 Wind Turbines:
a. Wind Turbines shall be set back a horizontal distance equivalent to the Minimum
Setback Distance from property boundaries, public and private rights-of-way, and
overhead utility lines that are not part of the proposed Generating Facility except
that the Orland Planning Board may allow a reduced setback if the Applicant
submits, in writing, a waiver of the property boundary setback signed by the
pertinent abutting landowner (See Section 15.0 - Mitigation Waivers) or, in the
case of a public way or private rights-of way and overhead utility lines, a report by a
qualified third-party engineer reasonably acceptable to the Orland Planning Board
that demonstrates, to the satisfaction of the Orland Planning Board, that a reduced
setback to public or private rights-of-way and overhead utility lines will not
adversely impact the public safety and welfare.
The Minimum Setback Distance is equal to: 1.5 times the turbine hub height plus
the turbine rotor diameter.
b. Wind Turbines shall be set back a horizontal distance of ½ mile (2640 feet) from all
non-participating Residences or Protected Locations. Non-participating
Landowners may waive this setback with a written Mitigation Waiver. (See Section
15.0 - Mitigation Waivers)
14.3 Use of Roads
1.
The Applicant shall identify all state and local public and private roads to be used
within Orland to transport equipment and parts for Construction, operation or
maintenance of a Type 2 or Type 3 Wind Energy Facility.
2.
The Road Commissioner or a qualified third-party engineer reasonably acceptable to
both the Orland Planning Board and the Applicant and paid for by the Applicant
25
pursuant to Section 9.7 of the Ordinance, shall document road conditions prior to
Construction. The Road Commissioner or third-party engineer shall document road
conditions again thirty (30) days after Construction is complete or as weather permits.
3.
The Applicant shall demonstrate, to the satisfaction of the Orland Planning Board, that
it has financial resources sufficient to comply with subsection 4, below, and the Orland
Planning Board may require the Applicant to post a bond or other security in order to
ensure such compliance.
4.
Any road damage caused by the Applicant or its contractors shall be promptly repaired
at the Applicant's expense.
14.4 Warnings
A clearly visible warning sign concerning voltage must be placed at the base of all pad-
mounted transformers and substations.
14.5 Artificial Habitat
To the extent practicable, the creation of artificial habitat for raptors or raptor prey shall be
minimized. In making its determination under this subsection the Orland Planning Board
shall consider comments and recommendations, if any, provided by the Maine Department of
Inland Fisheries and Wildlife.
14.6 Effect on Scenic Resources
1.
Except as otherwise provided in this subsection, if a Type 2 or Type 3 Wind Energy
Facility is proposed for location in or is visible from a Scenic Resource, the Applicant
shall provide the Orland Planning Board a visual impact assessment that addresses
the evaluation criteria in subsection 14.6.3. A visual impact assessment is not
required if the Wind Energy Facility is located more than 8 miles from the Scenic
Resource.
2.
The Orland Planning Board shall determine, based on consideration of the evaluation
criteria in subsection 14.6.3, whether the Type 2 or 3 Wind Energy Facility significantly
compromises views from a Scenic Resource such that the proposed facility has an
unreasonable adverse effect on the scenic character or existing uses related to scenic
character of that Scenic Resource.
3.
In making its determination pursuant to subsection 14.6.2 the Orland Planning Board
shall consider:
a. The significance of the potentially affected Scenic Resource;
b. The existing character of the surrounding area;
c. The extent, nature and duration of potentially affected public uses of the Scenic
Resource and the potential effect on the public's continued use and enjoyment of
the Scenic Resource; and
26
d. The scope and scale of the potential effect of views of the Wind Energy Facility on
the Scenic Resource, including issues related to the number and extent of Wind
Turbines visible from the Scenic Resource, the distance from the Scenic Resource
and the effect of prominent features of the Wind Energy Facility on the landscape.
A finding by the Orland Planning Board that the Type 2 or Type 3 Wind Energy Facility
is a highly visible feature in the landscape is not a solely sufficient basis for
determination that it has an unreasonable adverse effect on the scenic character and
existing uses related to scenic character of a Scenic Resource. In making its
determination under subsection 14.6.2, the Orland Planning Board shall consider
insignificant the effects of portions of a Type 2 or Type 3 Wind Energy Facility located
more than 8 miles, measured horizontally, from a Scenic Resource.
14.7 Shadow Flicker
1. Type 2 and Type 3 Wind Energy Facilities shall be designed and sited to avoid
unreasonable adverse Shadow Flicker and/or blade reflection effects at any
Occupied Building located on a Non-Participating Landowner's property. The
flicker or reflection shall not exceed 20 hours per year for any given Occupied
Building as determined by a computer modeling software that is current
technology.
2. Non-participating Landowners may waive the adverse effects of Shadow Flicker
with a written Mitigation Waiver. (See Section 15.0 - Mitigation Waivers)
14.8 Relationship to DEP Certification and Permitting
1.
For a Type 2 Wind Energy Facility for which a DEP Certification has been submitted in
accordance with section 10.1.14, the Orland Planning Board shall consider, to the
extent applicable, pertinent findings in that certification when making its determination
under sections 14.1, and 14.6. There is a rebuttable presumption that a Wind Energy
Facility that has obtained DEP Certification meets the requirements of sections 14.1,
and 14.6. The Orland Planning Board may, as a condition of approval of a Type 2
Wind Energy Facility that generates energy for sale or use by a Person other than the
generator, deem DEP's issuance of a certificate for the development sufficient to meet,
in whole or in part, as applicable, the requirements of sections 14.1, 14.6.
2.
If DEP has issued a Site Location of Development Act permit for a Type 3 Wind
Energy Facility pursuant to 38 M.R.S.A. § 484(3), there is a rebuttable presumption
that the development meets the requirements of sections 12.1, 14.1, 14.7, 14.12 and,
as it pertains to Scenic Resources of State or National Significance as defined by 35-A
M.R.S.A. §3451(9). The Orland Planning Board may, as a condition of approval of a
Type 3 Wind Energy Facility, deem DEP's issuance of a permit for the development
sufficient to meet, in whole or in part, as applicable, the requirements of sections 12.1,
14.1, 14.7, 14.12 and, as it pertains to Scenic Resources of state or national
significance, section 14.6.
27
14.9 Local Emergency Services
1.
The Applicant shall provide a copy of the project summary and site plan to local
Emergency service providers, including the Orland Fire Department, the ambulance
service that provides service to Orland, and the Hancock County Sheriff's Office.
2.
Upon request, the Applicant shall cooperate with Emergency service providers to
develop and coordinate implementation of an Emergency response plan for a Type 2
or Type 3 Wind Energy Facility.
3.
A Wind Turbine shall be equipped with an appropriate fire suppression system to
address fires within the Nacelle portion of the turbine or shall otherwise address the
issue of fire safety to the satisfaction of the Orland Planning Board and the Orland Fire
Chief.
14.10 Liability Insurance
The Applicant or an Applicant's designee acceptable to the Orland Planning Board shall
maintain a current general liability policy for the Type 2 or Type 3 Wind Energy Facility that
covers bodily injury and property damage with limits in an amount commensurate with the
scope and scale of the Facility. The Applicant or its designee shall deliver certificate(s) of
insurance to the Code Enforcement Officer prior to the commencement of Construction and
any time the owner of the insurance policy changes.
14.11 Design Safety Certification
Each Wind Turbine shall conform to applicable industry standards including those of the
American National Standards Institute (ANSI) and at least one of the following: Underwriters
Laboratories, Det Norske Veritas, Germanischer Llloyd Wind Energies, or other similar
certifying organization.
14.12 Decommissioning
The Applicant shall prepare a decommissioning plan in conformance with Appendix C.
28
15.0 Mitigation Waivers
Non-participating Landowners may waive specified protections of setbacks, noise and Shadow
Flicker described in this Ordinance using the Mitigation Waiver format in Appendix D, as
negotiated between the Applicant and the non-participating property owner. Copies of the
executed Mitigation Waivers must be included with the submission of the Application. The
Mitigation Waiver must be recorded in the Hancock County Register of Deeds, describe the
benefited and burdened properties and run with the land. The deed must advise all
subsequent owners of the burdened property.
16.0 Violations, Complaints, and Enforcement
16.1 Contact Information
The Applicant or its designee shall maintain a phone number and identify a responsible
Person for the Town of Orland to contact with inquiries and complaints throughout the life
of the Wind Energy Facility.
16.2 Complaint/Violation Process
1. Complaints and reports of violations must be made to the Orland Code
Enforcement Officer, in writing, using the Complaint/Violation Form (Appendix
E). The Code Enforcement Officer shall forward a copy of all reports to the
Applicant or its designee.
2. A noise violation is defined as three written reports attributed to the operation of
the Wind Energy Facility and received by the Code Enforcement Officer within a
period of one month or less.
3. If testing is required, the Town of Orland will engage the services of a Noise
Consultant to verify and monitor the noise emitted from the subject Wind
Turbines. The cost of the testing will be paid by the Wind Energy Facility owner.
Testing will be conducted for an appropriate time period and conducted
according to the measurement standards set forth in Appendix B.
4. If it is determined that the noise exceeds the noise standards outlined in
Appendix B, the Wind Energy Facility owner is responsible for mitigating the
problem so that the sound standards are met. Mitigation must be within 5 days if
it can be accomplished by operational changes. If repairs or other changes to
equipment are required, mitigation must be accomplished within 90 days if the
noise level is within 3 db of the standard. Mitigation must be immediate if the
noise level exceeds the standard by 6 db or more.
29
APPENDIX A
Application Fees
Permit application fees must be established by the Selectmen after adoption of this Ordinance as
provided in Section 9.3.1(b) of this Ordinance. The Selectmen shall hold a public hearing on the
proposed fee schedule prior to adoption of the fee schedule. The Selectmen shall review the fee
schedule annually and may revise the fee schedule only after prior notice and public hearing on the
revised fee schedule.
30
APPENDIX B
Control of Noise
Pursuant to section 14.1, noise emanating from a Type 2 Wind Energy Facility, a Type 3 Wind Energy Facility,
or, upon written request of the Applicant pursuant to section 13.1, a Type 1A or Type 1B Wind Energy Facility,
shall be controlled in accordance with the following provisions:
A. Sound Level Limits
(1) Sound from Routine Operation of Facility.
(a) Except as noted in subsections (b) and (c) below, the hourly Sound Levels resulting from Routine
Operation of the facility and measured in accordance with the measurement procedures described
in subsection F shall not exceed the following limits:
(i) At any property line of the facility site or contiguous property owned by the Applicant or
Participating Land Owner(s), whichever is farther from the proposed facility's regulated sound
sources:
75 dBA at any time of day.
(ii) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use or
use contemplated under a comprehensive plan, is not predominantly commercial,
transportation, or industrial;
55 dBA between 7:00 a.m. and 7:00 p.m.
(the "daytime hourly limit"), and
45 dBA between 7:00 p.m. and 7:00 a.m.
(the "nighttime hourly limit").
At Protected Locations more than 500 feet from living and sleeping quarters within the above
noted buildings or areas, the daytime Hourly Sound Level limits shall apply regardless of the
time of day.
(iii) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use or
use contemplated under a comprehensive plan, is predominantly commercial, transportation,
or industrial:
70 dBA between 7:00 a.m. and 7:00 p.m.
(the "daytime hourly limit"), and
60 dBA between 7:00 p.m. and 7:00 a.m.
(the 'nighttime hourly limit').
(iv) For the purpose of determining whether the use of an unzoned area is predominantly
commercial, transportation, or industrial (e.g. non-residential in nature), the Code Enforcement
Officer shall consider the municipality's comprehensive plan, if any. Furthermore, the usage of
properties abutting each Protected Location shall be determined, and the limits applied for that
Protected Location shall be based upon the usage occurring along the greater portion of the
31
perimeter of that parcel; in the event the portions of the perimeter are equal in usage, the limits
applied for that Protected Location shall be those for a Protected Location in an area for which
the use is not predominantly commercial, transportation, or industrial.
(v) At any Protected Location or Residence low frequency sound must:
1) Meet ANSI/ASA S12.2 indoor levels of low frequency sound for bedrooms, classrooms
and hospitals
2) Meet ANSI/ASA S12.2 indoor levels for moderately perceptible vibrations in lightweight
walls and ceilings
3) Meet ANSI S12.9 Part 4 for annoyance and beginning of rattles
4) Create no audible Infrasound to the most sensitive listeners
(b) If the Applicant chooses to demonstrate by measurement that the daytime and/or nighttime Pre-
development Ambient Sound environment at any Protected Location near the facility site exceeds
the daytime and/or nighttime limits in subsection 1(a)(ii) or 1(a)(iii) by at least 5 dBA, then the
daytime and/or nighttime limits shall be 5 dBA less than the measured daytime and/or nighttime
Pre-development Ambient Hourly Sound Level at the location of the measurement for the
corresponding time period.
(c) For any Protected Location near an Existing Facility, the hourly Sound Level limit for Routine
Operation of the Existing Facility and all future expansions of that facility shall be the applicable
hourly Sound Level limit of 1(a) or 1(b) above, or, at the Applicant's election, the Existing Hourly
Sound Level from Routine Operation of the Existing Facility plus 3 dBA.
(d) For the purposes of determining compliance with the above Sound Level limits, 5 dBA shall be
added to the observed levels of any Tonal Sounds that result from Routine Operation of the
facility.
(e) When Routine Operation of a facility produces short duration repetitive sound, the following limits
shall apply:
(i) For Short Duration Repetitive Sounds, 5 dBA shall be added to the observed levels of the
Short Duration Repetitive Sounds that result from Routine Operation of the facility for the
purposes of determining compliance with the above Sound Level limits.
(ii) For Short Duration Repetitive Sounds which the municipal entity responsible for review and
approval of a pending application under section 9.1 determines, due to their character and/or
duration, are particularly annoying or pose a threat to the health and welfare of nearby
neighbors, 5 dBA shall be added to the observed levels of the Short Duration Repetitive
Sounds that result from Routine Operation of the facility for the purposes of determining
compliance with the above Sound Level limits, and the Maximum Sound Level of the Short
Duration Repetitive Sounds shall not exceed the following limits:
32
(a) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use
or use contemplated under a comprehensive plan, is not predominantly commercial,
transportation, or industrial:
65 dBA between 7:00 a.m. and 7:00 p.m., and
55 dBA between 7:00 p.m. and 7:00 a.m.
(b) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use
or use contemplated under a comprehensive plan, is predominantly commercial,
transportation, or industrial:
75 dBA between 7:00 a.m. and 7:00 p.m., and
65 dBA between 7:00 p.m. and 7:00 a.m.
(c) The methodology described in subsection 1(a)(iv) shall be used to determine whether the
use of an unzoned area is predominantly commercial, transportation, or industrial.
(d) If the Applicant chooses to demonstrate by measurement that the Pre-development
Ambient Hourly Sound Level at any Protected Location near the facility site exceeds 60
dBA between 7:00 a.m. and 7:00 p.m., and/or 50 dBA between 7:00 p.m. and 7:00 a.m.,
then the Maximum Sound Level limit for short duration repetitive sound shall be 5 dBA
greater than the measured Pre-development Ambient Hourly Sound Level at the location of
the measurement for the corresponding time period.
(e) For any Protected Location near an Existing Facility, the Maximum Sound Level limit for
short duration repetitive sound resulting from Routine Operation of the Existing Facility and
all future expansions and modifications of that facility shall be the applicable Maximum
Sound Level limit of (e)(ii)(a) or (e)(ii)(b) above, or, at the Applicant's election, the existing
Maximum Sound Level of the short duration repetitive sound resulting from Routine
Operation of the Existing Facility plus 3 dBA.
NOTE: The Maximum Sound Level of the short duration repetitive sound shall be measured using the
fast response [LAFmax]. See the definition of Maximum Sound Level.
(2) Sound from Construction of a Facility
(a) The sound from Construction activities between 7:00 p.m. and 7:00 a.m. is subject to the following
limits:
(i) Sound from nighttime Construction activities shall be subject to the nighttime Routine
Operation Sound Level limits contained in subsections 1(a) and 1(b).
(ii) If Construction activities are conducted concurrently with Routine Operation of the facility, then
the combined total of Construction and Routine Operation sound shall be subject to the
nighttime Routine Operation Sound Level limits contained in subsections 1(a) and 1(b).
(iii) Higher levels of nighttime Construction sound are permitted when a duly issued permit
authorizing nighttime Construction sound in excess of these limits has been granted by the
Code Enforcement Officer.
33
(b) Sound from Construction activities between 7:00 a.m. and 7:00 p.m. shall not exceed the following
limits at the project property line:
Duration of Activity
Hourly Sound Level Limit
12 hours
82 dBA
8 hours
85 dBA
6 hours
87 dBA
4 hours
90 dBA
3 hours
92 dBA
2 hours
95 dBA
1 hour or less
100 dBA
(c) All equipment used in Construction on the facility site shall comply with applicable federal noise
regulations and shall include environmental noise control devices in proper working condition, as
originally provided with the equipment by its manufacturer.
(3) Sound from Maintenance Activities
(a) Sound from routine, ongoing maintenance activities shall be considered part of the Routine
Operation of the facility and the combined total of the routine maintenance and operation sound
shall be subject to the Routine Operation Sound Level limits contained in subsection 1.
(b) Sound from occasional, major, scheduled overhaul activities shall be subject to the Construction
Sound Level limits contained in subsection 2. If overhaul activities are conducted concurrently with
Routine Operation and/or Construction activities, the combined total of the overhaul, Routine
Operation and Construction sound shall be subject to the Construction Sound Level limits
contained in subsection 2.
B. Submissions
(1) Facilities with Minor Sound Impact.
An Applicant proposing facility with minor sound impact may choose to file, as part of the permit
application, a statement attesting to the minor nature of the anticipated sound impact of their facility.
An Applicant proposing an expansion or modification of an Existing Facility with minor sound impact
may follow the same procedure as described above. For the purpose of this ordinance, a facility or an
expansion or modification of an Existing Facility with minor sound impact means a facility where the
Applicant demonstrates, by estimate or example, that the regulated sound from Routine Operation of
the facility will not exceed 5 dBA less than the applicable limits established under Section A. It is the
intent of this subsection that an Applicant need not conduct Sound Level measurements to
demonstrate that the facility or an expansion or modification of an Existing Facility will have a minor
sound impact.
(2) Other Facilities
Technical information shall be submitted describing the Applicant's plan and intent to make adequate
provision for the control of noise. The Applicant's plan shall contain information such as the following,
when appropriate:
34
(a) Maps and descriptions of the land uses, local zoning and comprehensive plans for the area
potentially affected by sounds from the facility.
(b) A description of major sound sources, including Tonal Sound sources and sources of Short
Duration Repetitive Sounds, associated with the Construction, operation and maintenance of the
proposed facility, including their locations within the proposed facility.
(c) A description of the daytime and nighttime hourly Sound Levels and, for Short Duration Repetitive
Sounds, the Maximum Sound Levels expected to be produced by these sound sources at
Protected Locations near the proposed facility.
(d) A description of the Protected Locations near the proposed facility.
(e) A description of proposed major sound control measures, including their locations and expected
performance.
(f) A comparison of the expected Sound Levels from the proposed facility with the Sound Level limits
of this regulation. Expected Sound Levels shall be calculated with an acoustic model that
conforms to international Standard ISO 9613-2, assuming simultaneous operation of all Wind
Turbines and winter frozen-ground conditions. The acoustic modeling shall assume each turbine
emits the Maximum Sound power level guaranteed by the manufacturer for all wind speeds
including the uncertainty level (K-factor) for sound measurement uncertainty and turbine
production uncertainty (IEC Technical Specification 61400-14)
(g) The turbine sound power level frequency spectrum in the 1/3-octave bands.
C. Terms and Conditions
The Orland Planning Board may, as a term or condition of approval, establish any reasonable
requirement to ensure that the Applicant has made adequate provision for the control of noise from the
facility and to reduce the impact of noise on Protected Locations. Such conditions may include, but are
not limited to, enclosing equipment or operations, imposing limits on hours of operation, or requiring the
employment of specific design technologies, site design, modes of operation, or traffic patterns.
The Sound Level limits prescribed in this ordinance shall not preclude the Orland Planning Board from
requiring an Applicant to demonstrate that Sound Levels from a facility will not unreasonably disturb
wildlife or adversely affect wildlife populations in accordance with 12.1. In addition, the Sound Level limits
shall not preclude the Orland Planning Board, as a term or condition of approval, from requiring that lower
Sound Level limits be met to ensure that the Applicant has made adequate provision for the protection of
wildlife.
D. Waiver from Sound Level Limits
Orland recognizes that there are certain facilities or activities associated with facilities for which noise
control measures are not reasonably available. Therefore, the Orland Planning Board may grant a waiver
from any of the Sound Level limits contained in this ordinance upon (1) a showing by the Applicant that he
or she has made a comprehensive assessment of the available technologies for the facility and that the
Sound Level limits cannot practicably be met with any of these available technologies, and (2) a finding
by the Orland Planning Board that the proposed facility will not have an unreasonable impact on
35
Protected Locations. In addition, a waiver may be granted by the Orland Planning Board if (1) a facility is
deemed necessary in the interest of national defense or public safety and the Applicant has shown that
the Sound Level limits cannot practicably be met without unduly limiting the facility's intended function,
and (2) a finding is made by Orland Planning Board that the proposed facility will not have an
unreasonable impact on Protected Locations. The Orland Planning Board shall consider the request for a
waiver as part of the review of a completed permit application. In granting a waiver, the Orland Planning
Board may, as a condition of approval, impose terms and conditions to ensure that no unreasonable
sound impacts will occur.
E. Definitions
Terms used herein are defined below for the purpose of this noise regulation.
(1) AMBIENT SOUND: At a specified time, the all-encompassing sound associated with a given environment,
being usually a composite of sounds from many sources at many directions, near and far, including the
specific facility of interest.
(2) CONSTRUCTION: Activity and operations associated with the facility or expansion of the facility or its
site.
(3) EMERGENCY: An unforeseen combination of circumstances which calls for immediate action.
(4) EMERGENCY MAINTENANCE AND REPAIRS: Work done in response to an Emergency.
(5) ENERGY SUM OF A SERIES OF LEVELS: Ten times the logarithm of the arithmetic sum of the
antilogarithms of one-tenth of the levels. [Note: See Section F(4.2).]
(6) EXISTING FACILITY: A Wind Energy Facility legally constructed before the effective date of this
ordinance or a proposed Wind Energy Facility for which the Application is found complete on or before
the effective date of this ordinance. Any facility with an approved permit application which has been
remanded to the Orland Planning Board by a court of competent jurisdiction for further proceedings
relating to noise limits or noise levels prior to the effective date of this ordinance shall not be deemed an
Existing Facility and the ordinance shall apply to the existing noise sources at that facility.
(7) EXISTING HOURLY SOUND LEVEL: The hourly Sound Level resulting from Routine Operation of an
Existing Facility prior to the first expansion that is subject to this ordinance.
(8) EQUIVALENT SOUND LEVEL: The level of the mean-square A-weighted sound pressure during a stated
time period, or equivalently the level of the sound exposure during a stated time period divided by the
duration of the period. (NOTE: For convenience, a one hour Equivalent Sound Level should begin
approximately on the hour.)
(9) HISTORIC AREAS: Historic sites administered by the Bureau of Parks and Lands of the Maine
Department of Conservation, with the exception of the Arnold Trail.
(10)HOURLY SOUND LEVEL: The Equivalent Sound Level for one hour measured or computed in
accordance with this ordinance.
(11)INFRASOUND: Acoustic oscillations whose frequency is below the low frequency limit of audible sound
(about 16 Hz).
(12)LOW FREQUENCY NOISE: The measurable sound in the frequency range 20 - 200 Hz
36
(13)MAXIMUM SOUND LEVEL: Ten times the common logarithm of the square of the ratio of the Maximum
Sound to the reference sound of 20 micropascals. Symbol: LAFmax.
(14)MAXIMUM SOUND: Largest A-weighted and fast exponential-time-weighted sound during a specified
time interval. Unit: pascal (Pa).
(15)PRE-DEVELOPMENT AMBIENT: The Ambient Sound at a specified location in the vicinity of a facility
site prior to the Construction and operation of the proposed facility or expansion.
(16)ROUTINE OPERATION: Regular and recurrent operation of regulated sound sources associated with the
purpose of the facility and operating on the facility site.
(17)SHORT DURATION REPETITIVE SOUNDS: A sequence of repetitive sounds which occur more than
once within an hour, each clearly discernible as an event and causing an increase in the Sound Level of
at least 6 dBA on the fast meter response above the Sound Level observed immediately before and after
the event, each typically less than ten seconds in duration, and which are inherent to the process or
operation of the facility and are foreseeable.
(18)SOUND COMPONENT: The measurable sound from an audibly identifiable source or group of sources.
(19)SOUND LEVEL: Ten times the common logarithm of the square of the ratio of the frequency-weighted
and time-exponentially averaged Sound Pressure to the reference sound of 20 micropascals. For the
purpose of this ordinance, Sound Level measurements are obtained using the A-weighted frequency
response and fast dynamic response of the measuring system, unless otherwise noted.
(20)SOUND PRESSURE: Root-mean-square of the instantaneous Sound Pressures in a stated frequency
band and during a specified time interval. Unit: pascal (Pa).
(21)SOUND PRESSURE LEVEL: Ten times the common logarithm of the square of the ratio of the Sound
Pressure to the reference Sound Pressure of 20 micropascals.
(22)TONAL SOUND: for the purpose of this ordinance, a Tonal Sound exists if, at a Protected Location, the
one-third octave band Sound Pressure Level in the band containing the Tonal Sound exceeds the
arithmetic average of the Sound Pressure Levels of the two contiguous one-third octave bands by 5 dB
for center frequencies at or between 500 Hz and 10,000 Hz, by 8 dB for center frequencies at or between
160 and 400 Hz, and by 15 dB for center frequencies at or between 25 Hz and 125 Hz.
37
Additional acoustical terms used in work associated with this ordinance shall be used in accordance with the
following American National Standards Institute (ANSI) standards:
ANSI S12.9-1988 - American National Standard Quantities and Procedures for Description and
Measurements of Environmental Sound, Part 1;
ANSI S3.20-1973 - American National Standard Psychoacoustical Terminology;
ANSI S1.1-1960 - American National Standard Acoustical Terminology.
F. Measurement Procedures
(1) Scope. These procedures specify measurement criteria and methodology for use, with applications,
compliance testing and enforcement. They provide methods for measuring the Ambient Sound and the
sound from Routine Operation of the facility, and define the information to be reported. The same
methods shall be used for measuring the sound of Construction and maintenance activities.
(2) Measurement Criteria
2.1 Measurement Personnel
Measurements shall be supervised by personnel who are well qualified by training and experience in
measurement and evaluation of environmental sound, or by personnel trained to operate under a specific
measurement plan approved by the Orland Planning Board.
2.2 Measurement Instrumentation
(a) A Sound Level meter or alternative Sound Level measurement system used shall meet all of the Type
1 or 2 performance requirements of American National Standard Specifications for Sound Level
Meters, ANSI S1.4-1983.
(b) An integrating Sound Level meter (or measurement system) shall also meet the Type 1 or 2
performance requirements for integrating/averaging in the International Electrotechnical Commission
Standard on Integrating-Averaging Sound Level Meters, IEC Publication 804 (1985).
(c) A filter for determining the existence of Tonal Sounds shall meet all the requirements of-American
National Standard Specification for Octave-Band and Fractional Octave-Band Analog and Digital
Filters, ANSI S1.11-1986 for Order 3, Type 3-D performance.
(d) An acoustical calibrator shall be used of a type recommended by the manufacturer of the Sound Level
meter and that meets the requirements of American National Standard Specification for Acoustical
Calibrators, ANSI S1.40-1984.
(e) A microphone windscreen shall be used of a type recommended by the manufacturer of the Sound
Level meter.
2.3 Calibration
(a) The Sound Level meter shall have been calibrated by a laboratory within 12 months of the
measurement, and the microphone's response shall be traceable to the National Bureau of Standards.
(b) Field calibrations shall be recorded before and after each measurement period and at shorter intervals
if recommended by the manufacturer.
38
2.4 Measurement Location, Configuration and Environment
(a) Except as noted in subsection (b) below, measurement locations shall be at nearby Protected
Locations that are most likely affected by the sound from Routine Operation of the facility.
(b) For determining compliance with the 75 dBA property line Hourly Sound Level limit described in
subsection A(l)(a)(i), measurement locations shall be selected at the property lines of the proposed
facility or contiguous property owned by the Applicant, as appropriate.
(c) The microphone shall be positioned at a height of approximately 4 to 5 feet above the ground, and
oriented in accordance with the manufacturer's recommendations.
(d) Measurement locations should be selected so that no vertical reflective surface exceeding the
microphone height is located within 30 feet. When this is not possible, the measurement location may
be closer than 30 feet to the reflective surface, but under no circumstances shall it be closer than 6
feet.
(e) When possible, measurement locations should be at least 50 feet from any regulated sound source
on the facility.
(f) Measurement periods shall be avoided when the local wind speed exceeds 12 mph and/or
precipitation would affect the measurement results.
2.5 Measurement Plans. Plans for measurement of Pre-development Ambient Sound or post-facility
sound may be discussed with the Code Enforcement Officer.
(3) Measurement of Ambient Sound
3.1 Pre-development Ambient Sound
Measurements of the Pre-development Ambient Sound are required only when the Applicant elects to
establish the Sound Level limit in accordance with subsections A(1)(b) and A(1)(e)(ii)(d) for a facility in an
area with high Ambient Sound Levels, such as near highways, airports, or pre-existing facilities; or when
the Applicant elects to establish that the daytime and nighttime ambient Hourly Sound Levels at
representative Protected Locations exceed 45 dBA and 35 dBA, respectively.
(a) Measurements shall be made at representative Protected Locations for periods of time sufficient to
adequately characterize the Ambient Sound. At a minimum, measurements shall be made on three
different weekdays (Monday through Friday) during all hours that the facility will operate. If the
proposed facility will operate on Saturdays and/or Sundays, measurements shall also be made during
all hours that the facility will operate.
(b) Measurement periods with particularly high Ambient Sounds, such as during holiday traffic activity,
significant insect activity or high coastline waves, should generally be avoided.
(c) At any measurement location the daytime and nighttime ambient Hourly Sound Level shall be
computed by arithmetically averaging the daytime and nighttime values of the measured one hour
Equivalent Sound Levels. Multiple values, if they exist, for any specific hour on any specific day shall
first be averaged before the computation described above.
39
3.2
Post-Facility Ambient Sound
(a) Measurements of the post-facility ambient one hour Equivalent Sound Levels and, if Short Duration
Repetitive Sounds are produced by the facility, the Maximum Sound Levels made at nearby Protected
Locations and during representative Routine Operation of the facility that are not greater than the
applicable limits of subsection C clearly indicate compliance with those limits.
(b) Compliance with the limits of subsection A(l)(b) may also be demonstrated by showing that the post-
facility ambient Hourly Sound Level, measured in accordance with the procedures of subsection 3.1
above during Routine Operation of the facility, does not exceed the Pre-development Ambient Hourly
Sound Level by more than one decibel, and that the sound from Routine Operation of the facility is not
characterized by either Tonal Sounds or Short Duration Repetitive Sounds.
(c) Compliance with the limits of subsection A(1)(e)(ii)(d) may also be demonstrated by showing that the
post facility Maximum Sound Level of any short duration repetitive sound, measured in accordance
with the procedures of subsection 3.1 above, during Routine Operation of the facility, does not exceed
the Pre-development Ambient Hourly Sound Level by more than five decibels.
(d) .If any of the conditions in (a), (b) or (c) above are not met, compliance with respect to the applicable
limits must be determined by measuring the sound from Routine Operation of the facility in
accordance with the procedures described in subsection 4.
(4) Measurement of the Sound from Routine Operation of Facility.
4.1 General
(a) Measurements of the sound from Routine Operation of facilities are generally necessary only for
specific compliance testing purposes in the event that community complaints result from operation of
the facility, for validation of an Applicant's calculated Sound Levels when requested by the Orland
Planning Board, for determination of Existing Hourly Sound Levels for an Existing Facility or for
enforcement by the Code Enforcement Officer.
(b) Measurements shall be obtained during representative weather conditions when the facility sound is
most clearly noticeable. Preferable weather conditions for sound measurements at distances greater
than about 500 feet from the sound source include overcast days when the measurement location is
downwind of the facility and inversion periods (which most commonly occur at night).
(c) Measurements of the facility sound shall be made so as to exclude the contribution of sound from
facility equipment that is exempt from this regulation.
4.2 Measurement of the Sound Levels Resulting from Routine Operation of the Facility.
(a) When the Ambient Sound Levels are greater than the Sound Level limits, additional measurements
can be used to determine the hourly Sound Level that results from Routine Operation of the facility.
These additional measurements may include diagnostic measurements such as measurements made
close to the facility and extrapolated to the Protected Location, special checkmark measurement
techniques that include the separate identification of audible sound sources, or the use of Sound
Level meters with pause capabilities that allow the operator to exclude non-facility sounds.
(b) For the purposes of computing the hourly Sound Level resulting from Routine Operation of the facility,
sample diagnostic measurements may be made to obtain the one hour Equivalent Sound Levels for
each Sound Component.
(c) Identification of Tonal Sounds produced by the Routine Operation of a facility for the purpose of
adding the 5 dBA penalty in accordance with subsection A(l)(d) requires aural perception by the
40
measurer, followed by use of one-third octave band spectrum analysis instrumentation. If one or more
of the sounds of Routine Operation of the facility are found to be Tonal Sounds, the hourly Sound
Level component for Tonal Sounds shall be computed by adding 5 dBA to the one hour Equivalent
Sound Level for those sounds.
(d) Identification of Short Duration Repetitive Sounds produced by Routine Operation of a facility requires
careful observations. For the sound to be classified as short duration repetitive sound, the source(s)
must be inherent to the process or operation of the facility and not the result of an unforeseeable
occurrence. If one or more of the sounds of Routine Operation of the facility are found to be Short
Duration Repetitive Sounds, the hourly Sound Level component for Short Duration Repetitive Sounds
shall be computed by adding 5 dBA to the one hour Equivalent Sound Level for those sounds. If
required, the Maximum Sound Levels of Short Duration Repetitive Sounds shall be measured using
the fast response [LAFmax]. The duration and the frequency of occurrence of the events shall also be
measured. In some cases, the sound exposure levels of the events may be measured. The one hour
Equivalent Sound Level of a Short Duration Repetitive Sound may be determined from measurements
of the Maximum Sound Level during the events, the duration and frequency of occurrence of the
events, and their sound exposure levels.
(e) The daytime or nighttime hourly Sound Level resulting from Routine Operation of a facility is the
energy sum of the hourly Sound Level components from the facility, including appropriate penalties,
(see (c) and (d) above). If the energy sum does not exceed the appropriate daytime or nighttime
Sound Level limit, then the facility is in compliance with that Sound Level limit at that Protected
Location.
(5) Reporting Sound Measurement Data. The sound measurement data report should include the following:
(a) The dates, days of the week and hours of the day when measurements were made.
(b) The wind direction and speed, temperature, humidity and sky condition.
(c) Identification of all measurement equipment by make, model and serial number.
(d) The most recent dates of laboratory calibration of Sound Level measuring equipment.
(e) The dates, times and results of all field calibrations during the measurements.
(f) The applicable Sound Level limits, together with the appropriate hourly Sound Levels and the
measurement data from which they were computed, including data relevant to either tonal or Short
Duration Repetitive Sounds.
(g) A sketch of the site, not necessarily to scale, orienting the facility, the measurement locations,
topographic features and relevant distances, and containing sufficient information for another
investigator to repeat the measurements under similar conditions.
(h) A description of the sound from the facility and the existing environment by character and location.
41
APPENDIX C
Decommissioning Plan
Pursuant to section 14.12, the Applicant shall provide a plan for decommissioning a Type 2 or Type 3 Wind
Energy Facility. The decommissioning plan shall include, but shall not be limited to the following:
1. A description of the trigger for implementing the decommissioning plan. There is a rebuttable
presumption that decommissioning is required if no electricity is generated for a continuous period of
twelve (12) months. The Applicant may rebut the presumption by providing evidence, such as a force
majeure event that interrupts the generation of electricity, that although the project has not generated
electricity for a continuous period of 12 months, the project has not been abandoned and should not be
decommissioned.
2. A description of the work required to physically remove all Wind Turbines, associated foundations to a
depth of 24 inches, buildings, cabling, electrical components, and any other Associated Facilities to the
extent they are not otherwise in or proposed to be placed into productive use. All earth disturbed during
decommissioning must be graded and re-seeded, unless the landowner of the affected land requests
otherwise in writing.
[Note: At the time of decommissioning, the Applicant may provide evidence of plans for continued
beneficial use of any or all of the components of the Wind Energy Facility. Any changes to the approved
decommissioning plan shall be subject to review and approval by the Code Enforcement Officer.]
3. An estimate of the total cost of decommissioning less salvage value of the equipment and itemization of
the estimated major expenses, including the projected costs of measures taken to minimize or prevent
adverse effects on the environment during implementation of the decommissioning plan. The itemization
of major costs may include, but is not limited to, the cost of the following activities: turbine removal,
turbine foundation removal and permanent stabilization, building removal and permanent stabilization,
transmission corridor removal and permanent stabilization and road infrastructure removal and
permanent stabilization.
4. Demonstration in the form of a performance bond, surety bond, letter of credit, parental guarantee or
other form of financial assurance as may be acceptable to the Orland Planning Board that upon the end
of the useful life of the Wind Energy Facility the Applicant will have the necessary financial assurance in
place for 100% of the total cost of decommissioning, less salvage value. The financial assurance must
be in favor of the Town of Orland and structured so that funds are available only for decommissioning and
are protected from claims by any other creditors. The Applicant may propose securing the necessary
financial assurance in phases, as long as the total required financial assurance is in place a minimum of 5
years prior to the expected end of the useful life of the Wind Energy Facility.
42
APPENDIX D
Mitigation Waiver Form
The Waiver and Consent Agreement (the agreement) is effective on (Date)
Between---------The Applicant
Applicants address
And-------------The property owner
Property owner's address
Tax map and lot number of property
Property owner (name) waives specified protections of setbacks, noise and/or Shadow Flicker
described in the Orland Wind Energy Ordinance dated (date).
Signature of Applicant
Signature of Landowner
APPENDIX E
43
VIOLATION/COMPLAINT FORM
(Return this form to the Orland Code Enforcement Officer. Attach additional pages if necessary to adequately
explain your complaint.)
1. Complainant Information
a. Name ______________________________________
b. Address ____________________________________
c. Telephone __________________________________
d. Cell phone __________________________________
2. Facility
a. Corporate
Name
or
Owner
of
Facility
against
which
the
complaint
is
lodged
______________________________________________________
b. Location
(Be
specific.
If
a
specific
turbine
is
a
problem
identify
it.)
_______________________________________________
3. Noise Complaints
a. Type of Noise (Indicate all that apply.)
i. Low Frequency Noise/vibration __________
ii. High frequency noise ________
iii. Other (Please describe) __________________________________
b. Timing of Noise
i. Is noise only during the day, only at night, or any time? _________
ii. Is noise constant or intermittent ____________________________
1. If intermittent please describe the conditions under which the noise occurs
__________________________________
44
4. Shadow Flicker
a. Time(s) of Day shadow flicker is experienced ______________________
b. Duration of shadow flicker on a daily basis _________________________
c. Month(s) of Year shadow flicker is experienced _____________________
d. Describe how shadow flicker is affecting you _______________________
5. Other
a. Describe
the
nature
of
your
complaint
as
thoroughly
as
possible
______________________________________________________________________________
__________________________________________