Town of Orrington
Land Use Ordinance
Adopted June 6, 2005
Revised June 6, 2011, June 3, 2013,
June 2, 2014, June 1, 2015, July 27, 2020,
June 6, 2022, June 5, 2023
June 6, 2005, rev. June 6, 2011, June 3, 2013, July 27, 2020, June 6, 2022, June 5, 2023, June 3, 2024
June 6, 2005, rev. June 6, 2011, June 3, 2013, July 27, 2020, June 6, 2022, June 5, 2023
1
__________________________________________________________________________________
TABLE OF CONTENTS
__________________________________________________________________________________
ARTICLE 1 PREAMBLE
1.
Authority and Jurisdiction ............................................................................................... 1-1
2
Title .................................................................................................................................. 1-1
3.
Purpose ............................................................................................................................ 1-1
4.
Repeal of Conflicting Ordinances ................................................................................... 1-2
5.
Validity ............................................................................................................................ 1-2
6.
Amendments .................................................................................................................... 1-2
7.
Effective Date .................................................................................................................. 1-2
8.
Availability ...................................................................................................................... 1-2
9.
Conflicts with Other Ordinances ..................................................................................... 1-2
ARTICLE 2 LAND USE DISTRICTS
1. Classes of Districts ................................................................................................................ 2-1
2. Rule Governing District Boundaries ..................................................................................... 2-1
3. Land Use Requirements ......................................................................................................... 2-1
4. District Purposes .................................................................................................................... 2-2
5. District Requirements and Land Use Table ........................................................................... 2-3
6. Dimensional Requirements .................................................................................................... 2-9
ARTICLE 3 SHORELAND ZONING
1. Applicability .......................................................................................................................... 3-1
2. Districts and Zoning Map ...................................................................................................... 3-1
3. Description of District Boundaries ........................................................................................ 3-1
4. Scale of Map .......................................................................................................................... 3-2
5. Non-Conformance ................................................................................................................. 3-2
6. Establishment of Districts ...................................................................................................... 3-6
7. Table of Land Uses ................................................................................................................ 3-9
8. Land Use Standards ............................................................................................................. 3-13
A.
Minimum Lot Standards. ................................................................................... 3-13
B.
Agriculture ......................................................................................................... 3-14
C.
Archaeological Sites .......................................................................................... 3-15
D.
Beach Construction ............................................................................................ 3-15
E.
Campgrounds ..................................................................................................... 3-15
F.
Clearing of Vegetation for Development .......................................................... 3-15
G.
Commercial and Industrial Uses ........................................................................ 3-18
H.
Erosion and Sedimentation Control ................................................................... 3-19
I.
Essential Services .............................................................................................. 3-20
J.
Individual Private Campsites ............................................................................. 3-20
K.
Mineral Exploration and Extraction .................................................................. 3-21
L.
Parking Areas ..................................................................................................... 3-22
June 6, 2005, rev. June 6, 2011, June 3, 2013, July 27, 2020, June 6, 2022, June 5, 2023
2
M.
Piers, Docks, Wharves, etc. ............................................................................... 3-22
N.
Principal and Accessory Structures ................................................................... 3-23
O.
Roads and Driveways ........................................................................................ 3-26
P.
Septic Waste Disposal ....................................................................................... 3-28
Q.
Soils ................................................................................................................... 3-28
R.
Special Exception .............................................................................................. 3-29
S.
Storm Water Runoff .......................................................................................... 3-30
T.
Timber Harvesting ............................................................................................. 3-30
U.
Water Quality ..................................................................................................... 3-32
ARTICLE 4 PERFORMANCE STANDARDS
1.
Commercial Development in the MR-C District ............................................................. 4-1
2.
Commercial Removal of Earth Materials ........................................................................ 4-2
3.
Flood Hazard and/or Mud Slide Hazard Areas................................................................ 4-3
4.
Group Developments ....................................................................................................... 4-4
5.
Home Occupation ............................................................................................................ 4-4
6.
Junkyards and Automobile Graveyards ........................................................................... 4-5
7.
Mobile Home Parks ......................................................................................................... 4-6
8.
Off-Street Loading and Unloading .................................................................................. 4-7
9.
Off-Street Parking ............................................................................................................ 4-7
10.
Principal and Accessory Buildings and Uses of a Lot ..................................................... 4-9
Changes of use / nonconforming use....................................................................4-9
11.
Public Facilities (Federal, State, and Municipal) ............................................................. 4-9
12.
Signs
................................................................................................................. 4-9
13.
Requirements for Campgrounds and Travel Trailer Parks ............................................ 4-12
14.
Cluster Development Standards.................................................................4-13
15.
Yard Sale
............................................................................................................... 4-16
ARTICLE 5 ADMINISTRATION
1.
Administration ................................................................................................................. 5-1
A.
Administering bodies and agents ......................................................................... 5-1
2.
Permits required ............................................................................................................... 5-3
A.
Permit required .................................................................................................... 5-3
B.
Permit application ................................................................................................ 5-4
3.
Procedure for administering permits ............................................................................... 5-5
A.
Code enforcement officer action ......................................................................... 5-5
B.
Applicant responsibility ....................................................................................... 5-5
C.
Expiration of permit ............................................................................................. 5-6
D.
Installation of public utility service ..................................................................... 5-6
E.
Road culvert ......................................................................................................... 5-6
F.
Archaeological excavation................................................................5-6
G.
Required permits............................................................................5-6
4.
Certificate of occupancy required .................................................................................... 5-6
5.
Enforcement ................................................................................................................. 5-7
A.
Violations ............................................................................................................. 5-7
B.
Penalty ................................................................................................................. 5-7
C.
Other remedies ..................................................................................................... 5-7
June 6, 2005, rev. June 6, 2011, June 3, 2013, July 27, 2020, June 6, 2022, June 5, 2023
3
D.
Unsafe buildings .................................................................................................. 5-7
E.
Legal Obligations..........................................................................5-7
ARTICLE 6 SITE PLAN AND SUBDIVISION REVIEW
1.
Purpose
................................................................................................................. 6-1
2.
Applicability provisions ................................................................................................... 6-1
A.
Activities requiring site plan or subdivision review ............................................ 6-1
B.
Activities not requiring site plan review .............................................................. 6-2
C.
Prohibition ........................................................................................................... 6-2
D.
Waivers ................................................................................................................ 6-2
3.
Site plan and subdivision submission requirements ........................................................ 6-3
A.
Application submittal ........................................................................................... 6-3
B.
Evidence of fee payment ..................................................................................... 6-3
C.
Plan submittals and map scale ............................................................................. 6-3
D.
Existing site condition(s) plans ............................................................................ 6-4
E.
Proposed site plan(s) or subdivision .................................................................... 6-5
F.
Written supporting information ........................................................................... 6-7
4.
Review procedures ........................................................................................................... 6-8
A.
Informal pre-application conference .................................................................... 6-8
B.
Review procedure ................................................................................................ 6-9
C.
One year approval limitations ............................................................................ 6-12
D.
Final review ....................................................................................................... 6-12
E.
Project commencement and completion ............................................................ 6-13
F.
Other required permits ....................................................................................... 6-13
5.
Public hearing procedures .............................................................................................. 6-14
A.
Newspaper notice ............................................................................................... 6-14
B.
Sequence of presentation ................................................................................... 6-14
C.
Denial or approval ............................................................................................. 6-15
6.
Fees
............................................................................................................... 6-15
A.
Application fee ................................................................................................... 6-15
B.
Professional review and assistance .................................................................... 6-15
C.
Establishment of fees ......................................................................................... 6-16
7.
Performance guarantees ................................................................................................. 6-16
A.
Types of guarantees ........................................................................................... 6-16
B.
Contents of guarantee ........................................................................................ 6-16
C.
Escrow account .................................................................................................. 6-17
D.
Performance bond .............................................................................................. 6-17
E.
Letter of credit ................................................................................................... 6-17
F.
Phasing of development ..................................................................................... 6-17
G.
Release of guarantee .......................................................................................... 6-17
H.
Default ............................................................................................................... 6-17
8.
Statutory criteria ............................................................................................................ 6-18
9.
Specific standards .......................................................................................................... 6-20
A.
Buffering of adjacent uses ................................................................................. 6-20
B.
Buffering of residential uses .............................................................................. 6-20
C.
Conformance to Major Street plan .................................................................... 6-21
June 6, 2005, rev. June 6, 2011, June 3, 2013, July 27, 2020, June 6, 2022, June 5, 2023
4
D.
Conformance to future land use plan ................................................................. 6-21
E.
Curbs and gutters ............................................................................................... 6-21
F.
Easements .......................................................................................................... 6-21
G.
Exterior lighting ................................................................................................. 6-21
H.
Hazardous waste ................................................................................................ 6-22
I.
Landscaping ....................................................................................................... 6-22
J.
Large parcels ...................................................................................................... 6-22
K.
Lots
............................................................................................................... 6-22
L.
Monuments ........................................................................................................ 6-23
M.
Noise ............................................................................................................... 6-23
N.
Storage of materials ........................................................................................... 6-23
O.
Street name signs ............................................................................................... 6-23
P.
Subdivision or site plan names .......................................................................... 6-23
10.
Street construction standards ......................................................................................... 6-24
A.
Continuation ...................................................................................................... 6-24
B.
Names ............................................................................................................... 6-24
C.
Jogs
............................................................................................................... 6-24
D.
Street intersections ............................................................................................. 6-24
E.
Table of Geometric and Other standards for streets .......................................... 6-24
ARTICLE 7 FLOODPLAIN MANAGEMENT
1.
Purpose and Establishment .............................................................................................. 7-2
2.
Permit Required ............................................................................................................... 7-2
3.
Application for Permit ..................................................................................................... 7-3
4.
Application Fee and Expert's Fee .................................................................................... 7-4
5.
Review of Flood Hazard Development Permit Applications .......................................... 7-5
6.
Development Standards ................................................................................................... 7-6
A.
All Development .................................................................................................. 7-6
B.
Water Supply ....................................................................................................... 7-7
C.
Sanitary Sewage Systems .................................................................................... 7-7
D.
On Site Waste Disposal Systems ......................................................................... 7-7
E.
Watercourse Carrying Capacity ........................................................................... 7-7
F.
Utilities......................................................................................7-7
G.
Physical Changes to the Natural Landscape...........................................7-7
H.
Residential ........................................................................................................... 7-8
I.
Non-Residential ................................................................................................... 7-8
J.
Manufactured Homes ........................................................................................... 7-9
K.
Recreational Vehicles ........................................................................................ 7-10
I.
Accessory Structures ......................................................................................... 7-10
M.
Floodways .......................................................................................................... 7-11
N.
Hydraulic Openings/Flood Vents ...................................................................... 7-11
O.
Bridges ............................................................................................................... 7-12
P.
Containment Walls ............................................................................................ 7-13
Q.
Wharves, Piers and Docks ................................................................................. 7-13
7.
Certificate of Compliance .............................................................................................. 7-13
8.
Review of Subdivision and Development Proposals ..................................................... 7-14
9.
Appeals and Variances...........................................................................7-14
10.
Enforcement and Penalties.......................................................................7-16
June 6, 2005, rev. June 6, 2011, June 3, 2013, July 27, 2020, June 6, 2022, June 5, 2023
5
11.
Validity and Severability.........................................................................7-17
12.
Conflict with Other Ordinances..................................................................7-17
13.
Definitions.........................................................................................,.7-17
14.
Abrogation..........................................................................................7-22
15.
Disclaimer of Liability.............................................................................7-22
ARTICLE 8 BOARD OF APPEALS
1.
Establishment and Organization ...................................................................................... 8-1
2.
Appeals ............................................................................................................................ 8-1
3.
Powers and Duties of the Board of Appeals .................................................................... 8-1
A.
Interpretation ........................................................................................................ 8-1
B.
Administrative Appeal ......................................................................................... 8-1
C.
Variance Appeal .................................................................................................. 8-2
4.
Standards for Variances ................................................................................................... 8-2
5.
Floodplain Management Variances ................................................................................. 8-3
6.
Appeal Procedure ............................................................................................................. 8-5
A.
Making an Appeal ................................................................................................ 8-5
B.
Decision by Board of Appeals ............................................................................. 8-5
C.
Appeal to Superior Court ..................................................................................... 8-6
D.
Reconsideration ................................................................................................... 8-6
ARTICLE 9 DEFINITIONS
1.
General Definitions .......................................................................................................... 9-1
2.
List of Definitions ............................................................................................................ 9-1
June 6, 2005 rev. June 6, 2011
Preamble
1 - 1
ARTICLE I -- PREAMBLE
1.
AUTHORITY AND JURISDICTION
This Ordinance has been prepared in accordance with the home rule authority granted in Titles
30-A Maine Revised Statutes Annotated (MRSA) Section 3001 and Article VIII, Part 2, of the
Maine Constitution, Section 4352, Zoning Ordinances, and Title 38 MRSA Sections 435-449, as
amended, and shall be effective throughout the Town of Orrington.
2.
TITLE
This Ordinance and the accompanying official zoning map shall be known as and may be cited
as the "Land Use Ordinance, Town of Orrington, Maine."
3.
PURPOSE
This Ordinance has the following purposes:
A.
to promote the health, safety, and general welfare of the residents;
B.
to encourage the most appropriate use of land throughout the municipality;
C.
to promote traffic safety;
D.
to provide safety from fire and other elements;
E.
to provide adequate light and air;
F.
to prevent overcrowding of real estate;
G.
to provide wholesome home environment;
H.
to prevent housing development in unsanitary areas;
I.
to provide an adequate street system;
J.
to coordinate development of unbuilt areas
K.
to encourage the formation of community units;
L.
to provide an allotment of land area in new developments sufficient for all requirements
of community;
M.
to conserve natural resources;
N.
to prevent and control water pollution;
O.
to protect fish spawning grounds, aquatic life, bird and other wildlife habitat;
P.
to protect buildings and lands from flooding and accelerated erosion;
Q.
to protect archaeological and historic resources;
R.
to control building sites;
S.
to conserve shore cover;
T.
to conserve natural beauty and open space;
U.
to anticipate and respond to the impacts of development in shoreland areas; and
V.
to provide for adequate public services, as an integral part of a comprehensive plan for
municipal development.
June 6, 2005 rev. June 6, 2011
Preamble
1 - 2
4.
REPEAL OF CONFLICTING ORDINANCES
Any existing ordinances or such parts thereof as may be inconsistent herewith are repealed.
5.
VALIDITY
Should any section or part of a section or any provision of this Ordinance be declared by the
courts to be unconstitutional or invalid, such declaration shall not affect the validity of the
Ordinance as a whole or any part thereof other than the part so declared to be unconstitutional or
invalid.
6.
AMENDMENTS
The Town Meeting may, from time to time, amend this Ordinance upon review by the Planning
Board and after a public hearing. The State planning Office shall be notified in writing of any
amendments to this Ordinance within thirty (30) days of the adoption of such amendments.
Copies of amendments to the shoreland zoning provisions of this Ordinance, attested and signed
by the Municipal Clerk, shall be submitted by the Municipal Clerk to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to
act on any amendment within the forty-five (45) days of their receipt of the amendment, the
amendment shall be automatically approved. Any application for a permit submitted to the
municipality within the forty-five (45) day period shall be governed by the terms of this
ordinance, or ordinance amendment, if such amendment is approved by the Commissioner.
7.
EFFECTIVE DATE
This Ordinance shall take effect and be in force after its adoption by the town.
8.
AVAILABILITY
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible
to any member of the public. Copies shall be made available to the public at reasonable cost at
the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
9.
CONFLICTS WITH OTHER ORDINANCES
Whenever a provision of this ordinance conflicts with or is inconsistent with another provision
of this Ordinance or of any other ordinance, regulation or statute administered by the
municipality, the more restrictive provision shall control.
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 1
ARTICLE 2 -- LAND USE DISTRICTS
1.
CLASSES OF DISTRICTS
For the purpose of this Ordinance, the town is hereby divided into the following classes of
districts or zones:
Low Density Residential Districts to be known as "R" districts.
Highway Commercial Districts to be known as "C" districts.
General Industrial Districts to be known as "I" districts.
Rural Residential and Farming Districts to be known as "R-F" districts.
Mixed Residential-Commercial Districts to be known as "MR-C" districts.
Commerce Park Districts to be known as "CPD" districts.
Resource Protection Districts to be known as "RP" districts. (see Article 3)
Shoreland Residential Districts to be known as "SR" districts. (see Article 3)
Shoreland Industrial Districts to be known as "SI" districts. (see Article 3)
Stream Protection Districts to be known as "SP" districts. (see Article 3)
2.
RULES GOVERNING DISTRICT BOUNDARIES
The boundaries of these districts are hereby established as shown on the official Land Use District
Map. Said map is hereby made a part of this Ordinance; it shall be on file in the office of the
Town Clerk.
Unless otherwise indicated, the district boundary lines are the nearest lot lines, the center lines
of streets or such lines extended, the center lines of water courses or such lines extended, or the
Town boundary lines. Boundaries indicated as following or parallel to shorelines shall be
construed to follow or be parallel to the normal high-water line or upland edge of a wetland of
such shorelines, and in the event of changes in the shore line shall be construed as moving with
the actual shoreline. Distances may be determined where necessary by scale of the map.
Questions concerning the exact location of district boundaries shall be decided by the Board of
Appeals.
3.
LAND USE REQUIREMENTS
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
Any use or proposed use not explicitly listed in the Table of Uses (Article II) shall require
Planning Board evaluation/review to determine the most appropriate classification and any
applicable performance or siting requirements.
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 2
4.
DISTRICT PURPOSES
A.
Low-Density Residential District "R". The "R" District is established as a Growth
District in which the principal use of the land is for single-family dwellings at low-
density, together with the recreational, educational, religious facilities which will
encourage the development of well-rounded neighborhood living, and adjacent open
areas where similar residential growth appears likely.
B.
Highway Commercial District "C". The "C" District is established as a Growth District
in which the principal use of the land is for establishments offering accommodations,
services, or supplies to motorists, and in which vehicular access and parking is of primary
importance. Also compatible with this district are certain specialized business uses which
serve the entire town. The "C" District, ordinarily located along numbered state or federal
highways or other roads designated as major streets, is intended to help control
commercial sprawl along the highways by grouping together those businesses which are
most advantageously located on major streets. Any non-residential construction,
including new construction on existing and approved non-residential sites, shall be
subject to site plan review according to the requirements of Article 6.
C.
General Industrial District "I". The "I" District is established as a Growth District in
which the principal use of the land is for industry and associated uses. Certain open areas
favorably situated with respect to transportation and containing other factors conducive
to industrial development but not in conflict with residential neighborhoods or business,
are also included. This is for the purpose of reserving suitable land for the expansion of
existing industry and location of new industry, and to enhance economic development
and employment opportunities. Any non-residential construction, including new
construction on existing and approved non-residential sites, shall be subject to site plan
review according to the requirements of Article 6.
D.
Rural Residence and Farming District "R-F". The "R-F" District is established as a
Rural District in which the principal use of the land is for agriculture, forestry, rural-type
residence and customary associated uses. Large lots, with ample space between
buildings, are required as a means of reducing fire hazards, and also to provide sufficient
area for both private water supply and septic disposal system on the same lot. Other
purposes of this district include conservation of natural resources and reduction of soil
erosion.
E.
Mixed Residential-Commercial District "MR-C". The "MR-C" District is established
as a Growth District in which the principal use of the land is residential, but allows a
maximum diversity of uses compatible with residential use. Residential uses shall be
combined with governmental and retail uses, so as to provide interest and vitality to the
neighborhood. New developments shall be sited so that they present a harmonious mix
with existing uses. In determining this, the Planning Board shall establish performance
standards considering availability of appropriate outdoor space and other factors relevant
to ensuring that in the proposed development there will be no dangerous or unhealthy
conditions and that the design preserves the standing nature of the area and protects its
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 3
environment from undue or unreasonable degradation. The Planning Board may require
that appropriate buffer zones and landscaping be utilized to accomplish these objectives.
Any non-residential construction, including new construction on existing and approved
non-residential sites, shall be subject to site plan review according to the requirements of
Article 6.
F.
Commerce Park District "CPD". This District is designed and intended to
accommodate future "targeted" commercial and industrial development. Unique in its
topography and design, this District is situated with access to a transportation corridor,
and adjacent to existing industrial development. The "Park" is intended to accommodate
a variety of commercial and industrial developments, along with eco-related industries.
Proposed development in this district shall be subject to the review requirements of
Article 6 of this ordinance 1.
5.
DISTRICT REQUIREMENTS
Permitted uses and uses subject to planning board approval shall conform to all dimensional
requirements and other applicable requirements of this Ordinance. A plumbing permit and/or
building or use permit shall be required for all buildings, uses and sanitary facilities according to
the provisions of Article 5 Section 2 of this Ordinance. All uses shall comply with the land use
standards of Article 4.
Key
District Symbols
R
Low Density Residential District
RF
Rural Residence and Farming District
C
Highway Commercial District
I
General Industrial District
MR-C Mixed Residential-Commercial District
CPD Commerce Park District
Permit Symbols
Y
Yes; allowed without permit but must comply with standards
PB
Planning Board approval required; subject to site plan review (see CEO)
CEO Code Enforcement Officer Permit required
N
No, not allowed
Note: Numbers adjacent to some permit symbols (1, 2, etc.) refer to notes at the end of the
table which contain additional requirements.
1. A Tax Increment Financing District may be created to provide development incentive, encourage
a diversity of industrial uses to enhance the tax base, and secure resources for future economic
development investment.
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 4
Table 2-1
R
RF
C
I
MR-C CPD
Resource Extraction and Rural Uses
1. Agriculture
PB2, 23 CEO2, 23 PB2, 23
N
PB2, 23
N
2. Boarding and riding stables
N
PB
PB
N
PB
N
3. Commercial timber harvesting provided that
all State required permitting has been
obtained.
Y
Y
Y
Y
Y
N
4. Filling, grading, draining, dredging or
alteration of a water table or level, and not to
mean a pit or hole sunk into the earth to reach
a supply of water, with appropriate state
permits
Y
Y
CEO
CEO
CEO
PB
5. Outdoor recreation such as parks,
playgrounds and golf courses
PB
PB
PB
PB
PB
PB
6. Private, non-commercial stables
PB1
CEO
N
N
PB
N
7. Roadside produce stand
Y3
Y3
Y3
N
Y3
N
8. Earth materials extraction or storage for road
purposes only, affecting an area of less than
two acres in size.
CEO
CEO
CEO
CEO
CEO
CEO
9. Earth materials extraction or storage for road
purposes only, affecting an area of two acres
or greater in size.
PB
PB
PB
PB
PB
PB
10. Accessory structure, uses, or services that are
essential for the exercise of uses listed above.
CEO
CEO
CEO
CEO
CEO
CEO
Residential Uses
1. Single-family dwelling (Primary)
CEO
CEO
CEO
CEO
CEO
N
2. Single family mobile home (Primary)
CEO4
CEO4
CEO4
CEO4 CEO4
N
3. Duplex (two family Primary dwelling)
CEO
5,8
CEO
5,8
CEO
5,8
CEO5,
8
CEO5,
8
N
4. Multi-family dwelling (Primary)
PB6,8
PB8, 24
PB6,8
PB6,8
PB6,8
N
5. Mobile home park (see Article 4, Section 7)
N
PB
N
N
N
N
6. Home Occupation17
CEO
Y
Y
Y
Y
N
7. In-law apartment
CEO
CEO
CEO
CEO
CEO
N
8. Cluster
Development
(see
Article
4,
Section14)
N
PB
N
N
N
N
9. Accessory structures, uses or services that are
essential for the exercise of uses listed above.
CEO
CEO
CEO
CEO
CEO
N
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 5
R
RF
C
I
MR-C CPD
Institutional Uses
1. Cemetery
N
PB
N
N
N
N
2. Church
PB7,9
PB7,9
PB
N
PB7,9
N
3. Day care center
PB
PB
PB
N
PB
N
4. Fraternal order and service club
N
PB
PB
N
PB9
N
5. Governmental facilities and grounds
N
PB
PB
PB
PB9
PB
6. Group development, congregate housing,
boarding home facility17
PB
5,7,8,9,10
PB
PB
N
PB
N
7. Hospital
PB7,9
PB7,9
PB
N
PB7,9
N
8. Medical clinic, nursing home, convalescent
facility
PB7,9
PB7,9
PB
N
PB7
N
9. Museum
PB20
PB20
PB20
N
PB20
N
10. Public or private school
PB7,9
PB7,9
N
N
PB7,9
N
11. Religious services as ancillary use
N
N
PB
PB
PB
PB
12. Accessory structures, uses or services that are
essential for the exercise of uses listed above.
CEO
CEO
CEO
CEO
CEO
CEO
Commercial Uses
1. Art gallery/craft shop/gift shop
N
PB16
PB
N
PB16
N
2. Auction barn
N
PB16
PB
N
PB16
PB
3. Automobile sales lot
N
N
PB
N
PB
PB
4. Automobile service station and repair garage
N
N
PB
PB
PB
PB
5. Aviation Services
N
N
N
CEO
N
PB
6. Bed and breakfast
CEO
CEO
CEO
N
CEO
N
7. Campground, travel trailer park
N
PB
N
N
PB
N
8. Convention Center
N
N
PB
N
PB
PB
9. Commercial greenhouse, garden,
hydroponics17
CEO
CEO
PB
N
PB
PB
10. Line intentionally blank
11. Communication facility
N
PB
PB
PB
PB
PB
12. Communication tower
N
PB
PB
PB
N
PB
13. Financial institution
N
N
PB
N
PB
PB
14. Funeral home
PB
PB
PB
N
PB
N
15. Grocery and variety store
PB16
PB16
PB
N
PB
N
16. Health spa, fitness club, gym
N
N
PB
N
PB
N
17. Indoor entertainment and recreation
N
N
PB
N
PB
PB
18. Kennel-boarding site
N
PB
PB
N
PB
PB
19. Laundry, dry cleaning establishment
N
N
PB
PB
PB
N
20. Liquor store
N
N
PB
N
PB
N
21. Medical marijuana growing facility
N
N
N
N
N
PB21
22. Medical marijuana dispensary facility
N
N
N
N
N
PB21
23. Motel, hotel
N
N
PB
N
PB
PB
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 6
R
RF
C
I
MR-C CPD
24. Outdoor storage business
N
N
PB
N
N
PB
25. Line intentionally blank
26. Professional offices, office building
N
N
PB
PB
PB
PB
27. Redemption center
N
N
PB13
N
PB13
PB13
28. Restaurant
N
N
PB
N
PB
PB
29. Repair service (other than auto)
N
N
PB
PB
PB
PB
30. Retail outlets 19
N
N
PB11
N
PB
N
31. Self-storage building
N
PB22
PB
N
PB18
PB
32. Service business
N
N
CEO12
N
CEO
PB
33. Signs17
CEO14
CEO14
CEO14 CEO14 CEO14 CEO14
34. Take-out food service and catering facilities
N
N
PB
N
PB
PB
35. Veterinary clinic
N
PB
PB
N
PB
PB
36. Accessory structures, uses or services that are
essential for the exercise of uses listed above.
CEO
CEO
CEO
CEO
CEO
CEO
Industrial Uses
1. Automobile graveyard/junkyard
N
N
PB
PB
N
N
2. Bulk oil and fuel storage, in excess of 50
gallons except for onsite purposes
N
N
N
PB
N
PB
3. Construction equipment storage
N
N
N
PB
N
PB
4. Firewood processing
N
PB
N
PB
N
PB
5. Light manufacturing assembly plant
N
PB12
PB12
PB12
PB12
PB12
6. Lumber yard
N
PB15
PB
PB
PB
PB
7. Manufacturing
N
N
N
PB
N
PB
8. Newspaper facility
N
N
N
PB
N
PB
9. Printing Facility
N
N
PB
PB
PB
PB
10. Pulp mill
N
N
N
PB
N
N
11. Saw mill / Pellet Mill
N
PB15
N
PB
N
PB
12. Sewage treatment facility
N
N
N
PB
N
N
13. Solid waste transfer station
N
N
N
PB
N
N
14. Transportation facility
N
PB15
PB
PB
PB
PB
15. Warehouse
N
N
N
PB
N
PB
16. Wholesale business facility
N
N
N
PB
N
PB
17. Compressed and/or liquefied gas operations
(wholesale, distribution, processing, blending
and/or condensing)
N
N
N
PB
N
PB
18. Agricultural Facility
N
PB
N
N
N
PB
19. Distribution Facility
N
N
PB
PB
N
PB
20. Terminal Facility
N
N
PB
PB
N
PB
21. Alternative Energy Production
N
PB
PB
PB
PB
PB
22. Processing Facility
N
N
PB
PB
N
PB
23. Storage Facility, Industrial/Commercial
N
N
PB
PB
PB
PB
24. Production Facility
N
N
PB
PB
N
PB
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 7
R
RF
C
I
MR-C CPD
25. Ecological Production
N
PB
PB
PB
PB
PB
26. Research and Development
N
N
PB
PB
PB
PB
27. Accessory structures, uses or services that are
essential for the exercise of uses listed above.
N
CEO
CEO
CEO
CEO
CEO
Transportation and Utilities
1. Major utility facilities such as transmission
lines, but not including service drops
PB
PB
PB
PB
PB
PB
2. Road construction projects, other than land
management roads, and not part of a project
requiring Planning Board approval.
CEO
CEO
CEO
CEO
CEO
CEO
3. Road construction projects, other than land
management roads, which are part of a project
requiring Planning Board approval.
PB
PB
PB
PB
PB
PB
4. Accessory structures, uses or services that are
essential for the exercise of uses listed above.
CEO
CEO
CEO
CEO
CEO
CEO
Notes to table of land uses
1.
Provided they are not closer than 100 feet to any property line.
2.
Provided that no building or dairy, poultry, or livestock raising is constructed, moved or
enlarged to within 75 feet of the side or rear property lines.
3.
Provided that at least five off-street parking spaces are provided, with entrances and exits
approved by the Code Enforcement Officer.
4.
Provided a concrete pad or foundation shall be installed, and the unit shall be firmly
anchored by tie-downs.
5.
Average densities shall not exceed those established for single-family housing.
6.
Lots in the Growth Areas with no dwelling are allowed up to 4 dwelling units on the lot.
(Primary dwelling unit and 3 Accessory Dwelling Units).
Lots in the Rural Areas with a dwelling are allowed up to 2 additional Accessory dwelling
units on the lot. (Primary dwelling unit and 2 Accessory Dwelling Units). No more than
one of which may be detached.
7.
Provided they are not closer than 40 feet to any property line.
8.
Adequate highway access shall be available.
9.
Provided the use is located on a street with adequate highway capacity.
10.
Group developments shall be located on a site having a minimum area of two acres.
11.
Any retail or service business may include the incidental manufacture of products sold at
retail on the premises, provided that the manufacturing does not occupy more than 50%
of the total floor area, and employs no more than 4 persons on a single shift, but excluding
automobile graveyards or junkyards.
12.
Provided that they shall comply with Federal and State standards regarding water and air
pollution. Industries shall be required to prove to the Planning Board that the proposed
location, construction and operation will not injure present or prospective industrial
development in the district.
13.
No outside storage.
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 8
14.
Planning Board approval is required if the sign is to be lit.
15.
Provided that neighboring properties are protected from noise and that adequate provision
is made for accommodating the entering, exiting, and loading and unloading of transport
vehicles on the premises (off the right-of-way).
16.
Provided that gross floor area is not in excess of 5,000 square feet.
17.
Subject to land use standards of this Ordinance, Article 4.
18.
Minimum structure setback from Road Frontage property line right-of-way of 100 feet.
19.
If retail operations include the sale of compressed fuel gases, then the storage/dispensing
tank shall be limited to one tank per NFPA or DOT fuel classification and shall not exceed
a maximum size of 1000 gallons.
20.
Dwellings to be converted, as well as any structural alterations must maintain the
appearance of their existing use as determined by the Planning Board. New buildings
shall be designed and constructed so as to preserve the primary character of the
neighborhood. The Planning Board may make requirements regarding facade materials
and their texture (e.g., vinyl or wood clapboards, shingles, patterned shingles, and brick).
The layout of parking areas, service areas, entrances, exits, yards, signs, or lighting shall
be such as to protect the existing character of the district and any adjoining district.
21.
Minimum lot size 4 acres; Lot setback within district boundaries of 500 feet; Facility front
setback of 40 feet, side and rear setback of 100 feet; Refer all security to the State
requirements; Indoor growing only; Facility shall be non-transparent secured building;
The security measures that will be employed at the premises shall include, but are not
limited to, lighting, alarms, cameras, armed security personnel on the premises 24 hours
a day, seven days a week and automatic law enforcement notification; Security
surveillance shall, at a minimum, include security surveillance cameras installed and
operated 24 hours seven days a week to monitor all entrances, along with interior and
exterior of the premises to discourage and facilitate the reporting of criminal acts and
nuisance activities occurring at the premises; All security recordings shall be preserved
for at least one week by the management of the facility; Describe how the cultivated
and/or processed medical cannabis will be transported to the distribution facility and/or
qualified patients; On-site display, sale, use or of paraphernalia employed in the
consumption of medical cannabis shall not be allowed anywhere on site; Lot shall not be
within 500 feet of the property line of any school, church, licensed day care or residence;
Limited to only one such facility within the Town Boundaries.
22.
The site shall be screened from view of the abutting residential properties and public
roadways to the greatest practical extent utilizing natural buffers, berms, native vegetation
and fencing. Lighting at the site shall be shielded and downcast such that the light does
not spill onto adjacent parcels. Use shall be located on a parcel with adequate access and
highway capacity. All adjacent landowners shall be notified during the application and
review process. Hours of operations may be established to limit traffic flow.
23.
Agricultural Greenhouses, High Tunnels and Caterpillar Tunnels: Construction of
tunnels and greenhouses are intended to extend the growing season and maximize crop
production or as cost effective livestock housing or equipment storage on a farm.
These uses are considered pieces of farm equipment and not structures that require
building permits, provided they can reasonably be relocated or removed without
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 9
material damage to the soils on the property. They are also exempt from associated
fees. If these uses are placed on a slab or a permanent foundation, they would be
considered structures and lose the exempt status.
24.
Lots in the Rural District are allowed up to 3 dwelling units on the lot. (Primary
Dwelling and 2 Accessory Dwelling Units. No more than one of which may be
detached.
6.
DIMENSIONAL REQUIREMENTS
All structures and uses shall meet or exceed the following minimum requirements. Letters
adjacent to some dimensional requirements refer to notes at the end of the table which contain
additional requirements.
Table 2-2
R
RF
C
I
MR-C
CPD
Minimum lot size
1 acre
A, G
2 acres
B, G
1 acre
G
1 Acre
A, G
1 acre
A, G
1 Acre
A, G
Minimum lot width H
150 ft. H
250 ft. H
150 ft. H
200 ft. H
150 ft.
H
150 ft. H
Shore setback
75 ft.
75 ft.
75 ft.
75 ft.
75 ft.
75 ft.
Front yard
35 ft.
I
35 ft.
I
40 ft.
I
40 ft.
I
35/40ft.
E,I
25 ft.
I
Side, rear setbacks
20/15 ft.
C
20 ft.
20 ft.
25 ft.
20 ft.
15-25 ft.
Maximum lot coverage
30%
20%
50%
50%
50%
60 %
Maximum building height
35 ft.
35 ft.
35 ft.
75/50 ft.
D
35 ft.
Variable
J
Maximum building floor
area
Not
applicable
Not
applicable
Not
applicable
Not
applicable
F
Not
applicable
Notes to table of dimensional requirements
A. Must have at least ½ acre of contiguous developable area that does not contain wetland area
for the first unit and ¼ acre for each additional unit.
B. Must have at least 1 acre of contiguous developable area that does not contain wetland area
for the first unit and ½ acre for each additional unit.
C. 20 feet for the principal building, 15 feet for accessory buildings.
D. 75 feet if sprinkler system installed; all others 50 feet.
E. 35 feet for residential development; 40 feet for commercial development.
F. 7,000 square feet of gross floor area per acre, provided that the total floor area of all
commercial structures shall not exceed 20,000 square feet in floor area per level per parcel.
G. With functioning public water and sewer - one half the minimum lot size and width.
June 6, 2005 rev. June 2, 2009, June 6, 2011, June 3, 2013, June 2, 2014, June 1, 2015 June 6, 2016, July 27, 2020,
June 6, 2022, June 5, 2023, June 3, 2024
Land Use Districts
2 - 10
H. Minimum lot width is the closest distance between the side lot lines of a lot at the front
building line (see definition of lot width).
I.
Front yard property line - see Setback and Street Line definitions in Article 9
J.
Fire Department Review/Recommendation and may require a sprinkler system.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 1
ARTICLE 3 -- SHORELAND ZONING
1.
APPLICABILITY
In addition to the specific requirements of any district the following provisions will apply in all
land areas within 250 feet, horizontal distance, of the normal high-water line of any great pond,
or river; within 250 feet, horizontal distance, of the upland edge of a coastal wetland, including
all areas affected by tidal action, or upland edge of a freshwater wetland; and all land areas within
75 feet, horizontal distance, of the normal high-water line of a stream as defined in Article 9
Definitions.
This Article also applies to any structure built on, over or abutting a dock, wharf or pier, or other
structure extending or located below the normal high-water line of a water body or within a
wetland.
Note: Coastal wetlands, by definition, include all areas affected by tidal action, not just those
areas where salt marshes and salt meadows exist. Cobble and sand beaches, mudflats,
and rocky ledges, below the highest annual tide are all considered to be coastal wetlands.
2.
DISTRICTS AND LAND USE MAP
A.
Official Shoreland Land Use Map
The areas to which this Section of this Ordinance is applicable are hereby divided into
the following districts as shown on the Official Land Use Map which are a part of this
Ordinance:
1.)
Resource Protection District
2.)
Shoreland Residential District
3.)
Shoreland Industrial District I and Shoreland Industrial District II
4.)
Stream Protection District
3.
DESCRIPTION OF DISTRICT BOUNDARIES
This Ordinance applies specifically to the water bodies and wetlands as identified on the Official
Town of Orrington Land Use Map and is on file in the Town Hall.
A.
Resource Protection (See the official Orrington Land Use map.)
B.
Shoreland Residential (See the official Orrington Land Use Map.)
C.
Shoreland Industrial I and II
To include the area along the Penobscot River adjacent to the Industrial District. (See the
official Orrington Land Use District Map.)
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 2
D.
Stream Protection
1.)
So-called Baker Brook from the point of confluence of two intermittent streams
that form a brook to Brewer Lake.
2.)
Sedgeunkedunk Stream.
3.)
Swetts Pond Brook and Mill Creek from Swetts Pond to the Penobscot River and
the north and south branches of said brook system from their respectful wetland
headwaters.
4.)
Trout Pond and outlet.
5.)
Other Stream Protection Districts as shaded on the official Town of Orrington
Land Use District Map.
4.
SCALE OF MAP
The Official Land Use Map shall be available for viewing or purchase at the Town Hall. The
Map is at a scale of 1-inch = 1,000 feet (RF 1:12,000).
5.
NON-CONFORMANCE
A.
Non-conforming Structures
1.)
Expansions: A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new structure,
if such addition or expansion does not increase the non-conformity of the structure
and is in accordance with subparagraphs (a) and (b) below:
a.
After January 1, 1989 if any portion of a structure is less than the required
setback from the normal high-water line of a water body or tributary
stream or the upland edge of a wetland, that portion of the structure shall
not be expanded, as measured in floor area or volume, by more than 30%,
during the lifetime of the structure. If a replacement structure conforms
with the requirements of Section 5.A.3.), and is less than the required
setback from a water body, tributary stream or wetland, the replacement
structure may not be expanded if the original structure on January 1, 1989
had been expanded by 30% in floor area and volume since that date.
b.
Whenever a new, enlarged, or replacement foundation is constructed
under a non-conforming structure, the structure and new foundation must
be placed such that the setback requirement is met to the greatest practical
extent as determined by the Planning Board, basing its decision on the
criteria specified in Section 5.A.2.) Relocation, below. If the completed
foundation does not extend beyond the exterior dimensions of the structure
except for expansion in conformity with Section 5.A.1.a.) above, and that
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 3
the foundation does not cause the structure to be elevated by more than
three (3) additional feet, as measured from the uphill side of the structure
(from the original ground level to the bottom of the first floor sill), it shall
not be considered to be an expansion of the structure.
2.)
Relocation: A non-conforming structure may be relocated within the boundaries
of the parcel on which the structure is located provided that the site of relocation
conforms to all setback requirements to the greatest practical extent as determined
by the Planning Board, and provided that the applicant demonstrates that the
present subsurface sewage disposal system meets the requirements of State law
and the State of Maine Subsurface Wastewater Disposal Rules (Rules), or that a
new system can be installed in compliance with the law and said Rules. In no
case shall a structure be relocated in a manner that causes the structure to be more
non-conforming.
In determining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board shall consider the size of the lot, the slope of
the land, the potential for soil erosion, the location of other structures on the
property and on adjacent properties, the location of the septic system and other
on-site soils suitable for septic systems, and the type and amount of vegetation to
be removed to accomplish the relocation. When it is necessary to remove
vegetation with in the water or wetland setback area in order to relocate a
structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation. In addition, the area from which the
located structure was removed must be replanted with vegetation. Replanting shall
be required as follows:
(a) Trees removed in order to relocate a structure must be planted with at least
one native tree, three (3) feet in height, for every tree removed. If more than
five (5) trees are planed no one species of tree shall make up more than 50%
of the number of trees planted. Replaced trees must be planted no farther from
the water or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that were
removed or destroyed in order to relocate a structure must be re-established.
An area at least the size as the area where vegetation and/or ground cover was
disturbed, damaged, or removed must be reestablished within the setback area.
The vegetation and/or ground cover must consist of similar native vegetation
and/or ground cover that was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location
of the structure shall be replanted with vegetation which may consist of
grasses, shrubs, trees, or a combination thereof.
3.)
Reconstruction or Replacement: Any non-conforming structure which is
located less than the required setback from a water body, tributary stream, or
wetland and which is removed, or damaged or destroyed, regardless of cause, by
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 4
more than 50% of the market value of the structure before such damage,
destruction or removal, may be reconstructed or replaced provided that a permit
is obtained within eighteen (18) months of the date of said damage, destruction,
or removal, and provided that such reconstruction or replacement is in compliance
with the water body, tributary stream or wetland setback requirement to the
greatest practical extent as determined by the Planning Board in accordance with
the purposes of this Ordinance. In no case shall a structure be reconstructed or
replaced so as to increase its non-conformity. If the reconstructed or replacement
structure is less than the required setback it shall not be any larger than the original
structure, excepted as allowed pursuant to Section5.A.1.) above, as determined by
the non-conforming floor area and volume of the reconstructed or replaced
structure at its new location. If the total amount of floor area and volume of the
original structure can be located or reconstructed beyond the required setback
area, no portion of the relocated or reconstructed structure shall be replaced or
constructed at less than the setback requirement for a new structure. When it is
necessary to remove vegetation in order to replace or reconstruct a structure,
vegetation shall be planted in accordance with Section 5.A.2.) above.
Any non-conforming structure which is located less than the required setback
from a water body, tributary stream, or wetland and which is removed by 50% or
less of the market values, or damaged or destroyed by 50% or less of the market
value of the structure, excluding normal maintenance and repair, may be
reconstructed in place if a permit is obtained from the Code Enforcement Officer
within one year of such damage, destruction, removal.
In determining whether the building reconstruction or replacement meets the
setback to the greatest practical extent the Planning Board shall consider in
addition to the criteria in Section 5.A.2.) Relocation above, the physical condition
and type of foundation present, if any.
4.)
Change of Use of a Non-conforming Structure: The use of a non-conforming
structure may not be changed to another use unless the Planning Board after
receiving a written application determines that the new use will have no greater
adverse impact on the water body, tributary stream, or wetland, or on the subject
or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall
require written documentation from the applicant, regarding the probable effects
on public health and safety, erosion and sedimentation, water quality, fish and
wildlife habitat, vegetative cover, visual and actual points of public access to
waters, natural beauty, floodplain management, archaeological and historic
resources, and commercial fishing and maritime activities, and other functionally
water-dependent uses.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 5
B.
Non-conforming Uses
1.)
Expansions: Expansions of non-conforming uses are prohibited, except that
non-conforming residential uses may, after obtaining a permit from the Planning
Board, be expanded within existing residential structures or within expansions of
such structures as allowed in Section 5.A.1above.
2.)
Resumption Prohibited: A lot, building or structure in or on which a
non-conforming use is discontinued for a period exceeding one year, or which is
superseded by a conforming use, may not again be devoted to a non-conforming
use except that the Planning Board may, for good cause shown by the applicant,
grant up to a one year extension to that time period. This provision shall not apply
to the resumption of a use of a residential structure provided that the structure has
been used or maintained for residential purposes during the preceding five (5)
year period.
3.)
Change of Use: An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on
the subject and adjacent properties and resources, than the former use, as
determined by the Planning Board. The determination of no greater adverse
impact shall be made according to criteria listed in Section 5.A.4.) above.
C.
Non-conforming Lots
1.)
Non-conforming Lots: A non-conforming lot of record as of the effective date of
this Ordinance or amendment thereto may be built upon, without the need for a
variance, provided that such lot is in separate ownership and not contiguous with
any other lot in the same ownership, and that all provisions of this Ordinance
except lot area, lot width, and shore frontage can be met. Variances relating to
setback or other requirements not involving lot area, lot width, or shore frontage
shall be obtained by action of the Board of Appeals.
In any district in which single family dwellings are permitted, notwithstanding
limitations imposed by other provisions of this Ordinance, a single-family
dwelling and customary accessory buildings may be erected on any single lot of
record which conformed to the Ordinance at the effective date of this Ordinance.
Such lot must be in separate ownership and not continuous frontage with other
lots in the same ownership. This provision shall apply even though such lot fails
to meet the requirements for area and width, or both, that are generally applicable
in the district, provided that yard dimensions and other requirements not involving
area and width, or both, of the lot shall conform to the regulations for the district
in which the lot is located. Any lot in a preliminary or final subdivision plan
approved by the Orrington Planning Board as of December 1, 1973, meeting all
legal requirements of Orrington's Town Ordinance is exempted from any
subsequent changes in lot standards in this Ordinance.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 6
2.)
Contiguous Built Lots: If two or more contiguous lots or parcels are in a single
or joint ownership of record at the time of adoption of this Ordinance, if all or part
of the lots do not meet the dimensional requirements of this Ordinance, and if a
principal use or structure exists on each lot, the non-conforming lots may be
conveyed separately or together, provided that the State Minimum Lot Size Law
(12 M.R.S.A. sections 4807-A through 4807-D) and the State of Maine
Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the
effective date of this Ordinance, each may be sold on a separate lot provided that
the above referenced law and rules are complied with. When such lots are divided
each lot thus created must be as conforming as possible to the dimensional
requirements of this Ordinance.
3.)
Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or
parcels are in single or joint ownership of record at the time of or since adoption
or amendment of this Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments, and if
one or more of the lots are vacant or contain no principal structure the lots shall
be combined to the extent necessary to meet the dimensional requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one of
which is non-conforming, owned by the same person or persons on December 6,
1993 and recorded in the registry of deeds if the lot is served by a public sewer or
can accommodate a subsurface disposal system in conformance with the State of
Maine Subsurface Wastewater Disposal Rules and:
a.
each lot contains at least 100 feet of shore frontage and at least 20,000
square feet of lot area; or
b.
Any lots that do not meet the frontage and lot size requirements of Section
5.C.3.a.) above are reconfigured or combined so that each new lot contains
at least 100 feet of shore frontage and 20,000 square feet of lot area.
6.
ESTABLISHMENT OF DISTRICTS
A.
Resource Protection District
The Resource Protection District includes areas in which development would adversely
affect water quality, productive habitat, biological ecosystems, or scenic and natural
values. This district shall include the following areas when they occur within the limits
of the shoreland district, exclusive of the Stream Protection District, except that areas
which are currently developed and areas which meet the criteria for the Shoreland
Industrial I District need not be included within the Resource Protection District.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 7
1.)
Areas within 250 feet, horizontal distance, of the upland edge of freshwater
wetlands, and wetlands associated with great ponds and rivers, which are rated
"moderate" or "high" value waterfowl and wading bird habitat, including nesting
and feeding areas, by the Maine Department of Inland Fisheries and Wildlife
(MDIF&W) that are depicted in a Geographic Information System (GIS) data
layer maintained by either MDIF&W or the Department as of December 31, 2008.
For purposes if this paragraph "wetlands associated with great ponds and rivers"
shall mean area characterized by non-forested wetland vegetation and hydric soils
that are contiguous with a great pond or river, and have a surface elevation at or
below the at or below the water level of the great pond or river during the period
of normal high water. "Wetlands associated with great ponds or rivers" are
considered to be part of that great pond or river.
Note: The Natural Resources Protection Act, 38 M.R.S.A. sections 480-A
through 480-Z requires the Department of Environmental Protection to
designate areas of "significant wildlife habitat". Significant wildlife
habitat includes:
Habitat for species appearing on the official state or federal lists of
endangered or threatened species; high and moderate value deer
wintering areas and travel corridors as defined by the Department of
Inland Fisheries and Wildlife (DIF&W); high and moderate value
waterfowl and wading bird habitats, including nesting and feeding areas
as defined by the DIF&W; critical spawning and nursery areas for
Atlantic sea run salmon as defined by the Atlantic Sea Salmon
Commission; and shorebird nesting, feeding and staging areas and
seabird nesting islands as defined by the DIF&W.
2.)
Floodplains along rivers and floodplains along artificially formed great ponds
along rivers, defined by the 100 year floodplain as designated on the Federal
Emergency Management Agency's (FEMA) Flood Insurance Rate Maps on file
in the Town Office or Flood Hazard Boundary maps, or the flood of record, or in
the absence of these, by soil types identified as recent floodplain soils. This district
shall also include 100 year floodplains adjacent to tidal waters as shown on
FEMA's Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
3.)
Areas of two (2) or more contiguous acres with sustained slopes of 20% or greater.
4.)
Areas of two (2) or more contiguous acres supporting wetland vegetation and
hydric soils which are not part of a freshwater wetland as defined, and which are
not surficially connected to a water body during the period of normal high water.
Note: These areas usually consist of forested wetlands abutting water bodies and non-
forested wetlands.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 8
5.)
Land areas along rivers subject to severe bank erosion, undercutting, or river bed
movement and lands adjacent to tidal waters which are subject to severe erosion
or mass movement, such as steep coastal bluffs.
B.
Shoreland Residential District
The Shoreland Residential District includes those areas suitable for residential and
recreational development. It includes areas other than those in the Resource Protection
District or the Stream Protection District, and areas which are used less intensively than
those in the Shoreland Industrial Districts.
C.
Shoreland Industrial District I
The Shoreland Industrial District I includes the following types of exiting, intensively
developed areas:
1.)
Areas of two (2) or more contiguous acres devoted to commercial, industrial or
intensive recreational activities, or a mix of such activities, including but not
limited to the following:
a.
Areas devoted to manufacturing, fabricating or other industrial activities;
b.
Areas devoted to wholesaling, warehousing, retail trade and service
activities, or other commercial activities; and
c.
Areas devoted to intensive recreational development and activities, such
as, but not limited to amusement parks, race tracks and fairgrounds.
2.)
Areas otherwise discernable as having patterns of intensive commercial, industrial
or recreational uses.
D.
Shoreland Industrial District II
The Shoreland Industrial District II includes the same types of areas as those listed for
the Shoreland Industrial District I. The Shoreland Industrial District II, however, shall be
applied to newly established Shoreland Industrial Districts where the pattern of
development at the time of adoption is undeveloped or not as intensively developed as
that of the Shoreland Industrial District I.
Portions of the Shoreland Industrial District I or II may also include residential
development. However, no area shall be designated as a Shoreland Industrial
District I or II based solely on residential use.
In areas adjacent to great ponds and adjacent to rivers flowing to great ponds, the
designation of an area as a Shoreland Industrial District shall be based upon uses
existing at the time of adoption of this Ordinance. There shall be no newly
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 9
established Shoreland Industrial Districts or expansions in area of existing
Shoreland Industrial Districts adjacent to great ponds, and adjacent to rivers that
flow to great ponds.
E.
Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream, exclusive of those areas
within two-hundred and fifty (250) feet, horizontal distance, of the normal high-water
line of a great pond, or river, or within two hundred and fifty (250) feet, horizontal
distance, of the upland edge of a freshwater or coastal wetland. Where a stream and its
associated shoreland area is located within two-hundred and fifty (250) feet, horizontal
distance, of the above water bodies or wetlands, that land area shall be regulated under
the terms of the shoreland district associated with that water body or wetland.
7.
TABLE OF LAND USES
All land use activities, as indicated in Table 3 - 1, Land Uses in the Shoreland Districts, shall
conform with all of the applicable land use standards in Section 8. The district designation for a
particular site shall be determined from the Official Land Use Map.
Key to Table 3-1:
Permit Symbols
Yes-
Allowed (No permit required but the use must comply with all applicable land use
standards.)
No -
Prohibited
PB -
Allowed with approval by the Planning Board and a permit issued by the Code
Enforcement Officer
CEO- Allowed with permit issued by the Code Enforcement Officer
LPI-
Allowed with permit issued by the Local Plumbing Inspector
District Symbols:
RP - Resource Protection
SR - Shoreland Residential
SI - Shoreland Industrial I and Shoreland Industrial II
SP - Stream Protection
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 10
Table 3 - 1
Land Uses in the Shoreland Districts
LAND USES
DISTRICTS
RP
SP
SR
SI
1.
Non-intensive recreational uses not requiring structures
such as hunting, fishing and hiking
yes
yes
yes
yes
2.
Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
3.
Forest management activities except for timber
harvesting & land management roads
yes
yes
yes
yes
4.
Timber harvesting
CEO1
yes
yes
yes
5.
Clearing or removal of vegetation for activities other than
timber harvesting
CEO1
CEO
yes
yes
6.
Fire prevention activities
yes
yes
yes
yes
7.
Wildlife management practices
yes8
yes
yes
yes
8.
Soil and Water conservation practices
yes
yes
yes
yes
9.
Mineral exploration
yes2
no
yes2
yes2
10.
Mineral extraction including sand and gravel extraction
PB3
no
PB
PB
11.
Surveying and resource analysis
yes
yes
yes
yes
12.
Emergency Operations
yes
yes
yes
yes
13.
Agriculture
PB
yes
yes
yes
14.
Aquaculture
PB
PB
PB
yes
15.
Principal structures and uses
A. One and two family residential including driveways
B. Multi-family residential
C. Commercial
D. Industrial
E. Governmental and Institutional
F. Small non-residential facilities for educational,
scientific, or nature interpretation purposes
PB9
no
no10
no
no
PB
PB4
no
no10
no
no
PB4
CEO
PB
no10
no
PB
CEO
CEO
PB
PB
PB
PB
CEO
16.
Structures accessory to allowed uses
PB
PB4
CEO
yes
17.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 11
LAND USES
DISTRICTS
RP
SP
SR
SI
Piers, docks, wharfs, bridges and other structures and
uses extending over or below the normal high-water line
or within a wetland
A. Temporary
B. Permanent
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB
18.
Conversions of seasonal residences to year-round
residences
no
LPI
LPI
LPI
19.
Home occupations
PB
PB
PB
yes
20.
Private sewage disposal systems for allowed uses
no
LPI
LPI
LPI
21.
Essential services
A. Roadside distribution lines (34.5kV and Lower)
B. Non-roadside or cross-country distribution lines
involving ten poles or less in the shoreland district
C. Non-roadside or cross-country distribution lines
involving eleven or more poles in the shoreland district
D. Other essential services
CEO5
PB5
PB5
PB5
CEO5
PB5
PB5
PB5
yes12
CEO
PB
PB
yes12
CEO
PB
PB
22.
Service drops, as defined, to allowed uses
yes
yes
yes
yes
23.
Public and private recreational areas involving minimal
structural development
PB
PB
PB
CEO
24.
Individual private campsites
CEO
CEO
CEO
CEO
25.
Campgrounds
no6
no
PB
PB
26.
Road construction
no7
PB
PB
PB
27.
Land Management roads
PB
yes
yes
yes
28.
Parking facilities
no6
no
PB
PB
29.
Marinas
no
PB
PB
PB
30.
Filling and earthmoving of < 10 cubic yards
CEO
CEO
yes
yes
31.
Filling and earthmoving of > 10 cubic yards
PB
PB
CEO
CEO
32.
Signs14
CEO13
CEO13
CEO13
CEO13
33.
Uses similar to allowed uses
CEO
CEO
CEO
CEO
34.
Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 12
LAND USES
DISTRICTS
RP
SP
SR
SI
35.
Uses similar to uses requiring a PB permit
PB
PB
PB
PB
1 In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds
except to remove safety hazards.
2 Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in
total, is disturbed.
3 In RP not allowed in areas so designated because of wildlife value.
4 Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5 See further restrictions in Article 3 Section 8.I.
6 Except when area is zoned for resource protection due to floodplain criteria in which case a planning
board review and permit from the CEO is required.
7 Except as provided in Article 3 Section 8.O.
8 Within the "RP" district on the Richardson Tract, the Orrington Conservation Commission will
periodically conduct minimal timber harvesting in order to implement specific wildlife management
and fire-prevention programs. These programs will be implemented solely at the discretion of the
Conservation Commission, and will not require a permit from the CEO.
9 The Planning Board may approve and instruct the CEO to issue a permit for construction of a single-
family residence in a Resource Protection District if the applicant demonstrates that all of the
conditions in Article 3 Section 8.R, Special Exception, are met. Two-family residential structures are
prohibited.
10 Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are
allowed in the respective district
11 Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12 Permit not required but must file a written "notice of intent to construct" with CEO prior to
commencement of any construction.
13 Planning Board approval is required if the sign is to be lit.
14 Subject to land use standards of this Ordinance, Article 4.
Note: A person performing any of the following activities shall require a permit from the Department
of Environmental Protection, pursuant to38 MRSA, Section 480-C, if the activity occurs in, on, over or
adjacent to any freshwater or coastal wetland, great pond, river, stream or brook and operates in such
a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 13
8.
LAND USE STANDARDS (Adopted June 26, 1995)
All land use activities within the shoreland district shall conform with the following provisions,
if applicable.
A.
Minimum Lot Standards
1.) See Table 3-2
Table 3 - 2
Minimum Lot Standards - Shoreland Districts
Lot Standard
SR
SI
SP
RP
Minimum
Lot Area per
dwelling unit
and per
recreational
facility
Tidal
40,000 sf1
40,000 sf1
40,000 sf1
40,000 sf1
Non-Tidal
40,000 sf1
40,000 sf1
40,000 sf1
40,000 sf1
Minimum
Shore
Frontage per
dwelling unit
Tidal
150ft2
150 ft2
150 ft2
150 ft2
Non-Tidal
200 ft3
200 ft3
200 ft3
200 ft3
Minimum
Lot
Width
Tidal
150 ft2
200 ft.
150 ft2
150 ft2
Non-Tidal
200 ft3
200 ft3
200 ft3
200 ft3
Minimum
Front Yard
Depth
Tidal
35 ft.
40 ft.
35 ft.
35 ft.
Non-Tidal
35 ft5
40 ft5
35 ft5
35 ft5
Minimum
Side/Rear
Yard Depth
Tidal
20 ft4
25 ft.
20 ft.
20 ft.
Non-Tidal
20 ft4
25 ft.
20 ft.
20 ft.
1 60,000 square feet required per principal structure for Governmental, Institutional,
Industrial, or Commercial uses.
2 200 feet required per recreational facility, Governmental, Institutional, Industrial, or
Commercial uses.
3 300 feet required per principal structure for Governmental, Institutional, Industrial, or
Commercial uses, 200 feet required per recreational facility.
4 15 feet required for residential accessory structures.
5 Front yard property line - see Setback and Street Line definitions in Article 9
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 14
2.)
Land below the normal high water line of a water body or upland edge of a
wetland and land beneath roads serving two (2) or more lots shall not be included
toward calculating minimum lot area.
3.)
Lots located on opposite sides of a public or private road shall be considered each
a separate tract or parcel of land unless such road was established by the owner of
land on both sides thereof after September 22, 1971.
4.)
The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body or upland edge
of a wetland shall be equal to or greater than the shore frontage requirement for a
lot with the proposed use.
5.)
If more than one dwelling unit or, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed
or established on a single parcel, all dimensional requirements shall be met for
each additional dwelling unit, principal structure, or use.
B.
Agriculture
1.)
All spreading or manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on
November 1, 2001, and the Nutrient Management Law (7M.R.S.A. sections 4201-
4209.
2.)
Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal
distance, of a great pond or a river flowing to a great pond, or within seventy-five
(75) feet horizontal distance, of other water bodies, tributary streams, or wetlands.
All manure storage areas within the shoreland district must be constructed or
modified such that the facility produces no discharge of effluent or contaminated
storm water.
3.)
Agricultural activities involving tillage of soil greater than forty thousand
(40,000) square feet in surface area, within the shoreland district shall require a
Conservation Plan to be filed with the Planning Board. Non-conformance with
the provisions of said plan shall be considered to be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through
the Penobscot County Soil and Water Conservation District office.
4.)
There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond; within seventy-five (75)
feet, horizontal distance, from other water bodies and coastal wetlands; nor within
twenty-five (25) feet, horizontal distance, of tributary streams, and freshwater
wetlands. Operations in existence on the effective date of this Ordinance and not
in conformance with this provision may be maintained.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 15
5.)
Newly established livestock grazing areas shall not be permitted within one
hundred (100) feet, horizontal distance, of the normal high-water line of a great
pond; within seventy-five (75) feet, horizontal distance of other water bodies and
coastal wetlands; nor within twenty-five (25) feet, horizontal distance, of tributary
streams and freshwater wetlands. Livestock grazing associated with ongoing farm
activities, and which are not in conformance with the above setback provisions
may continue, provided that such grazing is conducted in accordance with a
Conservation Plan.
C.
Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on
or adjacent to sites listed on, or eligible to be listed on the National Register of Historic
Places, as determined by the permitting authority shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty
(20) days prior to action being taken by the permitting authority. The permitting authority
shall consider comments from the Commission prior to rendering a decision on the
application
D.
Beach Construction
Beach construction on any great pond, brook, river, stream or coastal wetland shall
require a permit from the Department of Environmental Protection.
E.
Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
1.)
Campgrounds shall contain a minimum of five thousand (5,000) square feet of
land, not including roads and driveways, for each site. Land supporting wetland
vegetation, and land below the normal high-water line of a water body shall not
be included in calculating land area per site.
2.)
The areas intended for placement of a recreational vehicle, tent or shelter, and
utility and service buildings shall be set back a minimum of one hundred (100)
feet, horizontal distance, from the normal high-water line of a great pond or a river
flowing to a great pond, and seventy-five (75) feet, horizontal distance, from the
normal high-water line of other water bodies, tributary streams, or the upland edge
of a wetland.
F.
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
1.)
In a for Resource Protection District abutting a great pond, there shall be no
cutting of vegetation within the strip of land extending 75 feet, horizontal
distance, inland from the normal high-water line, except to remove safety hazards.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 16
Elsewhere, in any Resource Protection District the cutting or removal of
vegetation shall be limited to that which is necessary for uses expressly authorized
in that district.
2.)
Except in areas as described in Subsection 1.), above, and except to allow for the
development of permitted uses, within a strip of land extending one-hundred (100)
feet, horizontal distance, inland from the normal high-water line of a great pond
or a river flowing to a great pond, and seventy-five (75) feet, horizontal distance,
from any other water body, tributary stream, or the upland edge of a wetland, a
buffer strip of vegetation shall be preserved as follows:
a.
There shall be no cleared opening greater than 250 square feet in the forest
canopy (or other existing woody vegetation if a forested canopy is not
present) as measured from the outer limits of the tree or shrub crown.
However, a footpath not to exceed six (6) feet in width as measured
between tree trunks and/or shrub stems is allowed provided that a cleared
line of sight to the water through the buffer strip is not created.
b.
Selective cutting of trees within the buffer strip is allowed provided that a
well-distributed stand of trees and other natural vegetation is maintained.
For the purposes of Section 8.F.2.b.) a "well-distributed stand of trees"
adjacent to a great pond, or a river or stream flowing to a great pond, shall
be defined as maintaining a rating score of 24or more in each 25-foot by
50-foot rectangular (1250 square feet) area as determined by the following
rating system:
Diameter of Tree at 4-1/2 feet
Above Ground Level (inches)
Points
2 < 4 in.
1
4 < 8 in.
2
8 < 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a
"well-distributed stand of trees" is defined as maintaining a minimum
rating score of 16 per 25-foot by 50-foot rectangular area.
Note: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot
contains four (4)trees between 2 and 4 inches in diameter, two trees
between 4 and 8 inches in diameter, three trees between 8 and 12 inches
in diameter, and two trees over 12 inches in diameter, the rating score is:
(4x1) + (2x2) + (3x 4) + (2x8) = 36 points
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 17
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees
totaling 12 points (36 - 24 = 12) may be removed from the plot provided
that no cleared openings are created.
The following shall govern in applying this point system:
(i)
The 25-foot by 50-foot rectangular plots must be
established where the landowner or lessee proposed
clearing within the required buffer:
(ii)
Each successive plot must be adjacent to, but not overlap
the previous plot;
(iii)
Any plot not containing the required points may no have
vegetation removed except as otherwise allowed by this
Ordinance;
(iv)
Any plot containing the required points may have
vegetation removed down to the minimum points required
or as otherwise allowed by this ordinance;
(v)
Where conditions permit, no more than 50% of the points
on any 25-foot by 50-foot rectangular are may consist of
trees greater than 12 inches in diameter.
For the purposes of Section 8.F.2.b.) "other natural vegetation" is defined
as retaining existing vegetation under three (3) feet in height and other
ground cover and retaining at least five (5) saplings less than two (2)
inches in diameter at four and one half (4 ½) feet above ground level for
each 25-foot by 50-foot rectangular area. If five saplings do not exist, no
woody stems less than two (2) inches in diameter can be removed until 5
samplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total
volume of trees four (4) inches or more in diameter, measured at 4 /12 feet
above ground level may be removed in any ten (10) year period.
c.
In order to protect water quality and wildlife habitat, existing vegetation
under three (3) feet in height and other ground cover, including leaf litter
and the forest duff layer shall not be cut, covered, or removed, except to
provide for a footpath or other permitted uses as described in paragraphs
2.) and 2.)a. above.
d.
Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
e.
In order to maintain a buffer strip of vegetation, when the removal of
storm-damaged, diseased, unsafe, or dead trees results in the creation of
cleared openings, these openings shall be replanted with native tree
species unless existing new tree growth is present.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 18
f.
Section 8.F.2.) does not apply to those portions of public recreational
facilities adjacent to public swimming areas as long as cleared areas are
limited to the minimum area necessary.
3.)
At distances greater than one hundred (100) feet, horizontal distance, from a great
pond or a river flowing to a great pond, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of any other water body, tributary
stream, or the upland edge of a wetland, there shall be allowed on any lot, in any
ten (10) year period, selective cutting of not more than forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured 4.5 feet above
ground level. Tree removal in conjunction with the development of permitted
uses shall be included in the forty (40) percent calculation. For the purposes of
these standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purposes, including but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed in the aggregate, 25% of the lot area within the shoreland district or ten
thousand (10,000) square feet, whichever is greater, including land previously
cleared. This provision shall not apply to the Shoreland Industrial Districts.
4.)
Legally existing nonconforming cleared openings may be maintained, but shall
not be enlarged, except as allowed by this Ordinance.
5.)
Fields and other cleared openings which have reverted to primarily shrubs, trees,
or other woody vegetation shall be regulated under the provisions Section 8 (F).
G.
Commercial and Industrial Uses
The following new commercial and industrial uses are prohibited within the shoreland
district adjacent to great ponds, and rivers and streams which flow to great ponds:
a.
Auto washing facilities
b.
Auto or other vehicle service and/or repair operations, including body
shops
c.
Chemical and bacteriological laboratories
d.
Storage of chemicals, including herbicides, pesticides or fertilizers other
than amounts normally associated with individual households or farms
e.
Commercial painting, wood preserving, and furniture stripping
f.
Dry cleaning establishments
g.
Electronic circuit assembly
h.
Laundromats, unless connected to a sanitary sewer
i.
Metal plating, finishing, or polishing
j.
Petroleum or petroleum product storage and/or sale except storage on
same property as use occurs and except for storage and sales associated
with marinas
k.
Photographic processing
l.
Printing
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 19
H.
Erosion and Sedimentation Control
1.)
All activities which involve filling, grading, excavation or other similar activities
which result in unstabilized soil conditions and which require a permit shall also
require a written soil erosion and sedimentation control plan. The plan shall be
submitted to the permitting authority for approval and shall include, where
applicable, provisions for:
a.
Mulching and revegetation of disturbed soil.
b.
Temporary runoff control features such as hay bales, silt fencing or
diversion ditches.
c.
Permanent stabilization structures such as retaining walls or riprap.
2.)
In order to create the least potential for erosion, development shall be designed to
fit with the topography and soils of the site. Areas of steep slopes where high cuts
and fills may be required shall be avoided wherever possible, and natural contours
shall be followed as closely as possible.
3.)
Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
stages of the activity. The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
4.)
Any exposed ground area shall be temporarily or permanently stabilized within
one (1) week from the time it was last actively worked, by use of riprap, sod, seed,
and mulch, or other effective measures. In all cases permanent stabilization shall
occur within nine (9) months of the initial date of exposure. In addition:
a.
Where mulch is used, it shall be applied at a rate of at least one (1) bale
per five hundred (500) square feet and shall be maintained until a catch of
vegetation is established.
b.
Anchoring the mulch with netting, peg and twine or other suitable method
may be required to maintain the mulch cover.
c.
Additional measures shall be taken where necessary in order to avoid
siltation into the water. Such measures may include the use of staked hay
bales and/or silt fences.
5.)
Natural and man-made drainage ways and drainage outlets shall be protected from
erosion from water flowing through them. Drainage ways shall be designed and
constructed in order to carry water from a twenty five (25) year storm or greater,
and shall be stabilized with vegetation or lined with rip-rap.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 20
I.
Essential Services
1.)
Where feasible, the installation of essential services shall be limited to existing
public ways and existing service corridors.
2.)
The installation of essential services other than road-side distribution lines, is not
allowed in a Resource Protection or Stream Protection District, except to provide
services to a permitted use within said district, or except where the applicant
demonstrates that no reasonable alternative exists. Where allowed, such
structures and facilities shall be located so as to minimize any adverse impacts on
surrounding uses and resources, including visual impacts.
3.)
Damaged or destroyed public transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
J.
Individual Private Campsites
Individual, private campsites not associated with campgrounds are allowed provided the
following conditions are met:
1.)
One campsite per lot existing on the effective date of this Ordinance, or thirty
thousand (30,000) square feet of lot area within the shoreland district, whichever
is less, may be permitted.
2.)
Campsite placement on any lot, including the area intended for a recreational
vehicle or tent platform, shall be set back one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond or river flowing to a
great pond, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a
wetland.
3.)
Only one recreational vehicle shall be allowed on a campsite. The recreational
vehicle shall not be located on any type of permanent foundation except for a
gravel pad, and no structure except a canopy shall be attached to the recreational
vehicle.
4.)
The clearing of vegetation for the siting of the recreational vehicle, tent or similar
shelter in the Resource Protection District shall be limited to one thousand (1,000)
square feet.
5.)
A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by the
Local Plumbing Inspector. Where disposal is off-site, written authorization from
the receiving facility or land owner is required.
6.)
When a recreational vehicle, tent or similar shelter is placed on-site for more than
one hundred and twenty (120) days per year, all requirements for residential
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 21
structures shall be met, including the installation of a subsurface sewage disposal
system in compliance with the State of Maine Subsurface Wastewater Disposal
Rules unless served by public sewage facilities.
K.
Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from
the Code Enforcement Officer shall be required for mineral exploration which exceeds
the above limitation. All excavations, including test pits and holes shall be immediately
capped, filled or secured by other equally effective measures, to restore disturbed areas
and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
1.)
A reclamation plan shall be filed with, and approved by the Planning Board before
a permit is granted. Such plan shall describe in detail procedures to be undertaken
to fulfill the requirements of paragraph 3.) below.
2.)
No part of any extraction operation, including drainage and runoff control
features, shall be permitted within one hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond or a river flowing to a great pond, and
within seventy-five (75) feet, horizontal distance, of the normal high-water line
of any other water body, tributary stream, or the upland edge of a wetland.
Extraction operations shall not be permitted within fifty (50) feet of any property
line, without written permission of the owner of such adjacent property.
3.)
Within twelve (12) months following the completion of extraction operations at
any extraction site, which operations shall be deemed complete when less than
one hundred (100) cubic yards of materials are removed in any consecutive twelve
(12) month period, ground levels and grades shall be established in accordance
with the following:
a.
All debris, stumps, and similar material shall be removed for disposal in
an approved location, or shall be buried on-site. Only materials generated
on-site may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, Title 38, M.R.S.A., section
1301 and the solid waste management rules, Chapters 400-419 of the
Department of Environmental Protection's regulations may contain other
applicable provisions regarding disposal of such materials.
b.
The final grade shall be no greater than a slope of two and one-half (21/2)
horizontal to one (1) vertical.
c.
Top soil or loam shall be retained to cover all disturbed land areas, which
shall be reseeded and stabilized with vegetation native to the area.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 22
Additional topsoil or loam shall be obtained from off-site sources if
necessary to complete the stabilization project.
4.)
In keeping with the purposes of this Ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated with
mineral extraction operations on surrounding uses and resources.
L.
Parking Areas
1.)
Parking areas shall meet the shoreline and tributary stream setback requirements
for structures for the district in which such areas are located. The setback
requirement for parking areas serving public boat launching facilities, in districts
other than the Shoreland Industrial District I shall be reduced to no less than fifty
(50) feet, horizontal distance, from the shoreline or tributary stream if the
Planning Board finds that no other reasonable alternative exists farther from the
shoreline or tributary stream.
2.)
Parking areas shall be adequately sized for the proposed use and shall be designed
to prevent storm water runoff from flowing directly into a water body, tributary
stream or wetland and where feasible, to retain all runoff on-site.
3.)
In determining the appropriate size of proposed parking facilities, the following
shall apply:
a.
Typical parking space: Approximately ten (10) feet wide and twenty (20)
feet long, except that parking spaces for a vehicle and boat trailer shall be
forty (40) feet long.
b.
Internal travel aisles: Approximately twenty (20) feet wide.
M.
Piers, Docks, Wharfs, Bridges and Other Structures and Uses Extending Over or
Below the Normal High-Water Line of a Water Body or Within a Wetland
1.)
Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
2.)
The location shall not interfere with existing developed or natural beach areas.
3.)
The facility shall be located so as to minimize adverse effects on fisheries.
4.)
The facility shall be no larger in dimension than necessary to carry on the activity
and be consistent with the surrounding character and uses of the area. A temporary
pier, dock or wharf in non-tidal waters shall not be wider than six (6) feet for non-
commercial uses.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 23
5.)
No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending below the normal high-water line of a water body or within a
wetland unless the structure requires direct access to the water body or wetland as
an operational necessity.
6.)
New permanent piers and docks on non-tidal waters shall not be permitted unless
it is clearly demonstrated to the Planning Board that a temporary pier or dock is
not feasible, and a permit has been obtained from the Department of
Environmental Protection, pursuant to the Natural Resource Protection Act.
7.)
No existing structures built on, over or abutting a pier, dock, wharf or other
structure extending below the normal high-water line of a water body or within a
wetland shall be converted to residential dwelling units in any district.
8.)
Except in the Shoreland Industrial Districts, structures built on, over or abutting a
pier, wharf, dock or other structure extending below the normal high-water line
of a water body or within a wetland shall not exceed twenty (20) feet in height
above the pier, wharf, dock or other structure.
9.)
New permanent structures, and expansions thereof, projecting into or over water
bodies shall require a permit from the Department of Environmental Protection
pursuant to the Natural Resources Protection Act, 38 MRSA Title, Section 480-C.
Permits may also be required from the Army Corps of Engineers if located in
navigable waters.
N.
Principal and Accessory Structures
1.)
All new principal and accessory structures shall be set back at least one hundred
(100) feet, horizontal distance, from the normal high-water line of great ponds and
rivers that flow to great ponds, and seventy-five (75) feet, horizontal distance,
from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland, except that in the Shoreland Industrial District I the
setback from the normal high-water line shall be at least twenty-five (25) feet,
horizontal distance. In the Resource Protection District the setback requirement
shall be 250 feet, horizontal distance, except for structures, roads, parking spaces
or other objects specifically allowed in that district in which case the setback
requirements specified above shall apply.
In addition:
a.
The water body, tributary stream, or wetland setback provision shall
neither apply to structures which require direct access to the water body
or wetland as an operational necessity, such as piers, docks and retaining
walls, nor to other functionally water-dependent uses.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 24
b.
On a non-conforming lot of record on which only a residential structure
exists, and it is not possible to place an accessory structure meeting the
required water body, tributary stream or wetland setbacks, the code
enforcement officer may issue a permit to place a single accessory
structure, with no utilities, for the storage of yard tools and similar
equipment. Such accessory structure shall not exceed eighty (80) square
feet in area nor eight (8) feet in height, and shall be located as far from the
shoreline or tributary stream as practical and shall meet all other applicable
standards, including lot coverage, and vegetation clearing limitations. In
no case shall the structure be located closer to the shoreline or tributary
stream than the principal structure.
Note: All tidal land which is subject to tidal action during the highest annual tide is
coastal wetland.
Note: A tributary stream may be perennial or intermittent. Where a tributary stream is
present within the shoreland district, setback standards from the tributary stream
are applicable.
2.)
Principal or accessory structures and expansions of existing structures which are
permitted in the Resource Protection, Shoreland Residential, and Stream
Protection Districts, shall not exceed thirty-five (35) feet in height. This provision
shall not apply to structures such as transmission towers, windmills, antennas, and
similar structures having no floor area.
3.)
The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least one (1) foot above the elevation of the 100
years flood, the flood or record, or in the absence of these, the flood as defined by
soil types identified as recent floodplain soils. Accessory structures may be
placed in accordance with the standards outlined in Article 7 of this ordinance and
need not meet the elevation requirements of this paragraph.
4.)
The total footprint area of all structures, parking lots and other non-vegetated
surfaces, within the shoreland district shall not exceed twenty (20) percent of the
lot or a portion thereof, located within the shoreland district, including land area
previously developed, except in the Shoreland Industrial District adjacent to tidal
waters and rivers that do not flow to great ponds, where lot coverage shall not
exceed seventy (70) percent.
5.)
Retaining walls that are not necessary for erosion control shall meet the structure
setback requirement, except for low retaining walls and associated fill provided
all of the following conditions are met:
a.
The site has been previously altered and an effective vegetated buffer does
not exist;
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 25
b.
The wall(s) is (are) at least 25 feet, horizontal distance, from the normal
high-water line of a water body, tributary stream, or upland edge of a
wetland;
c.
The site where the retaining wall will be constructed is legally existing
lawn or is a site eroding from lack of naturally occurring vegetation, and
which cannot be stabilized with vegetative plantings;
d.
The total height of the wall(s), in the aggregate, are no more than 24
inches;
e.
Retaining walls are located outside of the 100-year floodplain on rivers,
streams, coastal wetlands, and tributary streams, as designated on the
Federal Emergency Management Agency's (FEMA) Flood Insurance
Maps or Flood Hazard Boundary Maps, or the flood of record, in the
absence of these, by soil types identified as recent floodplain soils.
f.
The area behind the wall is revegetated with grass, shrubs, trees, or
combination thereof, and no further structural development will occur
within the setback area including patios and decks; and
g.
A vegetated buffer area is established within 25 feet, horizontal distance,
of the normal high-water line of a water body, tributary stream, or upland
edge of a wetland when a natural buffer does not exist. The buffer area
must meet the following characteristics:
i.
The buffer must include shrubs and other woody and herbaceous
vegetation. Where the natural ground cover is lacking the area must
be supplemented with leaf or bark mulch;
ii.
Vegetation plantings must be in quantities sufficient to retard
erosion and provide for effective infiltration of storm water runoff;
iii.
Only native species may be used to establish the buffer area;
iv.
A minimum buffer width of 15 feet, horizontal distance, is required,
measured perpendicular to the normal high-water line or upland edge
of a wetland;
v.
A footpath not to exceed the standards in Section 8.F.2.a., may
traverse the buffer.
Note: It the wall and associated soil disturbance occurs within 75 feet horizontal
distance, of a water body, tributary stream or coastal wetland, a permit pursuant
to the Natural Resource Protection Act is required from the Department of
Environmental Protection.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 26
6.)
Notwithstanding the requirements stated above, stairways or similar structures,
shall be allowed to provide shoreline access in areas of steep slopes or unstable
soils provided; that the structure is limited to a maximum of four (4) feet in width;
that the structure does not extend below or over the normal high-water line of a
water body or upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, 38
M.R.S.A., section 480-C); and that the applicant demonstrates that no reasonable
access alternative exists on the property.
O.
Roads and Driveways
The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
1.)
Roads and driveways shall be set back at least one-hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond or a river that flows to
a great pond, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a
wetland unless no reasonable alternative exists as determined by the Planning
Board. If no other reasonable alternative exists, the road and/or driveway setback
requirement shall be no less than fifty (50) feet, horizontal distance, upon clear
showing by the applicant that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts placed so as to avoid
sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback
shall be increased by ten (10) feet, horizontal distance, for each five (5) percent
increase in slope above twenty (20) percent.
Section 8.0.1. does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures and facilities located nearer
to the shoreline or tributary stream due to an operational necessity, excluding
temporary docks for recreational uses. Roads and driveways providing access to
permitted structures within the setback area shall comply fully with the
requirements of Section 8.0.1 except for that portion of the road or driveway
necessary for direct access to the structure.
2.)
Existing public roads may be expanded within the legal road right-of-way
regardless of their setback from a water body, tributary stream or wetland.
3.)
New roads and driveways are prohibited in a Resource Protection District except
that the Planning Board may grant a permit to construct a road or driveway to
provide access to permitted uses within the district. A road or driveway may also
be approved by the Planning Board in a Resource Protection District, upon finding
that no reasonable alternative route or location is available outside the district.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 27
When a road or driveway is permitted in a Resource Protection District the road
and/or driveway shall be set back as far as practicable from the normal high water
line of a water body, tributary stream, or upland edge of a wetland.
4.)
Road and driveway banks shall be no steeper than a slope of two (2) horizontal to
one (1) vertical, and shall be graded and stabilized in accordance with the
provisions for erosion and sedimentation control contained in Article 3 Section
8.H.
5.)
Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
6.)
In order to prevent road and driveway surface drainage from directly entering
water bodies, tributary stream or wetlands, roads and driveways shall be designed,
constructed, and maintained to empty onto an unscarified buffer strip at least (50)
feet plus two times the average slope, in width between the outflow point of the
ditch or culvert and the normal high-water line of a water body, tributary stream,
or upland edge of a wetland. Surface drainage which is directed to an unscarified
buffer strip shall be diffused or spread out to promote infiltration of the runoff and
to minimize channelized flow of the drainage through the buffer strip.
7.)
Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified buffer strips
before the flow gains sufficient volume or head to erode the road, driveway, or
ditch. To accomplish this, the following shall apply:
a.
Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road or driveway at intervals no greater than indicated in
the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21+
40
b.
Drainage dips may be used in place of ditch relief culverts only where the
grade is ten (10) percent or less.
c.
On sections having slopes greater than ten (10) percent, ditch relief
culverts shall be placed at approximately a thirty (30) degree angle
downslope from a line perpendicular to the centerline of the road or
driveway.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 28
d.
Ditch relief culverts shall be sufficiently sized and properly installed in
order to allow for effective functioning, and their inlet and outlet ends shall
be stabilized with appropriate materials.
9.)
Ditches, culverts, bridges, dips, water turnouts and other storm water runoff
control installations associated with roads and driveways shall be maintained on
a regular basis to assure effective functioning.
P.
Septic Waste Disposal
1.)
All subsurface sewage disposal systems shall be installed in conformance with the
State of Maine Subsurface Wastewater Disposal Rules, and the following;
a.
clearing or removal of woody vegetation necessary to site a new system
and any associated fill extensions, shall not extend closer than 75 feet,
horizontal distance, from the normal high-water line of a water body or
the upland edge of a wetland and,
b.
a holding tank is not allowed for a first-time residential use in a shoreland
district.
NOTE:
The Maine Subsurface Water Disposal Rules, require new systems, excluding fill
extensions, to be constructed no less than 100 horizontal feet from the normal
high-water line of a perennial water body. The minimum setback distance for a
new subsurface disposal system may not be reduced by variance.
Q.
Soils
All land uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts,
including severe erosion, mass soil movement, and water pollution, whether during or
after construction. Proposed uses requiring subsurface waste disposal, and commercial
or industrial development and other similar intensive land uses, shall require a soils
report, based on an on-site investigation and be prepared by state-certified professionals.
Certified persons may include Maine Certified Soil Scientists, Maine Registered
Professional Engineers, Maine State Certified Geologists and other persons who have
training and experience in the recognition and evaluation of soil properties. The report
shall be based upon the analysis of the characteristics of the soil and surrounding land
and water areas, maximum ground water elevation, presence of ledge, drainage
conditions, and other pertinent data which the evaluator deems appropriate. The soils
report shall include recommendations for a proposed use to counteract soil limitations
where they exist.
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 29
R.
Special Exception
In addition to the criteria specified in Article 5 Section 1.A.3.)c., excepting structure
setback requirements, the Planning Board may approve and instruct the CEO to issue a
permit for construction of a single-family residence in a Resource Protection District if
the applicant demonstrates that all of the following conditions are met.
1.)
There is no location on the property, other than a location within the Resource
Protection District, where the structure may be built.
2.)
The lot on which the structure is proposed is undeveloped and was established
and recorded in the registry of deeds of the county in which the lot is located
before the adoption of the Resource Protection District.
3.)
All proposed buildings, sewage disposal system and other improvements are:
a.
Located on natural ground slopes less than 20%; and
b.
Located outside the floodway of the 100-year floodplain along rivers and
artificially formed great ponds along rivers and outside the velocity district
in areas subject to tides, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's (FEMA)
Flood Boundary and Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at least one foot above the
100-year floodplain elevation; and the development is otherwise in
compliance with any applicable municipal floodplain ordinance.
If the floodway is not shown on the FEMA maps, it is deemed to be the
width of the 100-year floodplain. For purposes of this subparagraph,
"floodway" means the channel of a river or other watercourse and adjacent
land areas that must be reserved in order to discharge the 100-year flood
without cumulatively increasing the water surface elevation more than one
foot in height and "velocity district" means an area of special flood hazard
extending from offshore to the inland limit of the primary frontal dune
along an open coast and any other area subject to high-velocity wave
action from storms or seismic sources.
4.)
The total ground-floor area, including cantilevered or similar overhanging
extensions, of all principal and accessory structures is limited to a maximum of
1,500 square feet. This limitation shall not be altered by any variance (MDEP 06-
096 Chapter 1000 section 16E4).
5.)
All structures, except functionally water-dependent structures, are set back from
the normal high-water line of a water body, tributary stream or upland edge of a
wetland to the greatest practical extent, but not less than 75 feet, horizontal
distance. In determining the greatest practical extent, the planning board shall
consider the depth of lot, the slope of the land, the potential for soil erosion, the
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 30
type and amount of vegetation to be removed, the proposed building site's
elevation in regard to the floodplain and its proximity to moderate-value and high-
value wetlands.
S.
Storm Water Runoff
1.)
All new construction and development shall be designed to minimize storm water
runoff from the site in excess of the natural predevelopment conditions. Where
possible, existing natural runoff control features, such as berms, swales, terraces
and wooded areas shall be retained in order to reduce runoff and encourage
infiltration of storm waters.
2.)
Storm water runoff control systems shall be maintained as necessary to ensure
proper functioning.
Note: The Storm water Management Law (38 M.R.S.A. section 420-d) requires a full
permit to be obtained from the DEP prior to construction of a project consisting
of 20,000 square feet or more of impervious area of 5 acres or more of a
developed area in an urban impaired stream watershed or most-at-risk lake
watershed, or a project with one (1) acre or more of development area in any
other stream, coastal or wetland watershed. A permit-by-rule is necessary for a
project with one (1) acre or more of disturbed area but less than one (1) acre of
impervious area (20,000 square feet for most-at-risk lakes and urban impaired
streams) and less than five (5) acres of developed area. Furthermore, a Maine
Construction General Permit is required if the construction will result in one (1)
acre or more of disturbed area.
T.
Timber Harvesting
The municipal regulation of timber harvesting activities is repealed on the statutory date established under 38
M.R.S.A. section 438-B(5), at which time the State of Maine Department of Conservation's Bureau of
Forestry shall administer timber harvesting standards in the shoreland district. On the date established under
38 M.R.S.A section 438-B(5), the following provisions of this Ordinance are repealed:
-
Section 7. Table of Land Uses, Item 3 (Forest management activities except for timber
harvesting), Item 4 (Timber harvesting), and Item 27 (Land management roads);
-
Section 8.T, Timber Harvesting, in its entirety; and
-
Article 9. Definitions, the definitions of "forest management activities", "land management
roads", "skid trail", "slash" and "residual basal area".
NOTE: The statutory date established under 38 M.R.S.A. section 438-B(5) is the effective date of state-
wide timber harvesting standards. That date is "the first day of January of the 2nd year following the
year in which the Commissioner of Conservation determines that at least 252 of the 336 municipalities
identified by the Commissioner of Conservation as the municipalities with the highest acreage of timber
harvesting activity on an annual basis for the period 1992-2003 have either accepted the state-wide
standards or have adopted an ordinance identical to the state-wide standards." 38 M.R.S.A. section
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 31
438-B(5) further provides that "the Commissioner of Conservation shall notify the Secretary of State in
writing and advise the Secretary of the effective date of the state-wide standards."
1.)
In a shoreland area zoned for resource protection abutting a great pond, timber
harvesting shall be limited to the following:
a.
Within a strip of land extending 75 feet inland from the normal high-water
line timber harvesting is prohibited, except to remove safety hazards.
b.
Beyond the 75 foot strip referred to in paragraph a. above, timber
harvesting is permitted in accordance with paragraph 2.) below except that
in no case shall the average residual basal area of trees over 1 inch in
diameter at 4 1/2 feet above ground level be reduced to less than 30 square
feet per acre.
2.)
Except in areas as described in Paragraph 1.) above, timber harvesting shall
conform with the following provisions:
a.
Selective cutting of no more than forty (40) percent of the total volume of
trees four (4) inches or more in diameter measured at 4 feet above ground
level on any lot in any ten (10) year period is permitted. In addition:
i.
Within one-hundred (100) feet, horizontal distance of the normal
high-water line of a great pond or a river flowing to a great pond,
and within seventy-five (75) feet, horizontal distance, of the
normal high-water line of other water bodies, tributary streams, or
the upland edge of a wetland, there shall be no clearcut openings
and a well-distributed stand of trees and other vegetation,
including existing ground cover, shall be maintained.
ii.
At distances greater than one-hundred (100) feet, horizontal
distance, of a great pond or a river flowing to a great pond, and
greater than seventy-five (75) feet, horizontal distance, of the
normal high-water line of other water bodies or the upland edge of
a wetland, harvesting operations shall not create single clearcut
openings greater than ten-thousand (10,000) square feet in the
forest canopy. Where such openings exceed five-thousand (5000)
square feet they shall be at least one hundred (100) feet apart. Such
clearcut openings shall be included in the calculation of total
volume removal. For the purposes of these standards volume may
be considered to be equivalent to basal area.
b.
Timber harvesting operations exceeding the 40% limitation in paragraph
a. above, may be allowed by the Planning Board upon a clear showing,
including a forest management plan signed by a Maine licensed
professional forester, that such an exception is necessary for good forest
management and will be carried out in accordance with the purposes of
June 6, 2005 rev. June 6, 2011, June 2, 2014, July 27, 2020, June 5, 2023
Shoreland Zoning
3 - 32
this Ordinance. The Planning Board shall notify the Commissioner of the
Department of Environmental Protection of each exception allowed,
within fourteen (14) days of the Planning Board's decision.
c.
No accumulation of slash shall be left within fifty (50) feet of the normal
high-water line of a water body. In all other areas slash shall either be
removed or disposed of in such a manner that it lies on the ground and no
part thereof extends more than four (4) feet above the ground. Any debris
that falls below the normal high-water line of a water body shall be
removed.
d.
Timber harvesting equipment shall not use stream channels as travel
routes except when:
i.
Surface waters are frozen; and
ii.
The activity will not result in any ground disturbance.
e.
All crossings of flowing water shall require a bridge or culvert, except in
areas with low banks and channel beds which are composed of gravel,
rock or similar hard surface which would not be eroded or otherwise
damaged.
f.
Skid trail approaches to water crossings shall be located and designed so
as to prevent water runoff from directly entering the water body or
tributary stream. Upon completion of timber harvesting, temporary
bridges and culverts shall be removed and areas of exposed soil
revegetated.
g.
Except for water crossings, skid trails and other sites where the operation
of machinery used in timber harvesting results in the exposure of mineral
soil shall be located such that an unscarified strip of vegetation of at least
seventy-five (75) feet in width for slopes up to ten (10) percent shall be
retained between the exposed mineral soil and the normal high-water line
of a water body or upland edge of a wetland. For each ten (10) percent
increase in slope, the unscarified strip shall be increased by twenty (20)
feet. The provisions of this paragraph apply only to a face sloping toward
the water body or wetland, provided, however, that no portion of such
exposed mineral soil on a back face shall be closer than twenty five (25)
feet from the normal high-water line of a water body or upland edge of a
wetland.
U.
Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 1
Performance Standards
ARTICLE 4 -- PERFORMANCE STANDARDS
1.
COMMERCIAL DEVELOPMENT IN THE MR-C DISTRICT
A. Not less than 20 percent of the lot area shall be dedicated to green space.
B. Commercial development shall not exceed 60 percent of the total Land use in any MR-C
District.
C. Commercial development shall be served by public water and sewer if available public water
and sewer is within 200 (two hundred) feet of closest lot boundary line.
D. The developer shall file with the town a performance guarantee in an amount sufficient to
defray the cost of improving the means of vehicular access and landscaping, as specified in
the site plan and approved by the Planning Board. The conditions and amount of such
performance bond shall be determined by the town manager with the advice of the various
municipal departments and agencies concerned. The amount shall be at least equal to the total
cost of buffer zones, curbing, landscaping, and providing vehicular access, where required.
E. The construction will be designed so as to protect the public health and safety, environmental
quality, and economic well-being of the municipality, and will be subject to a minimal control
of those uses which by virtue of their external effects (waste stockpile or discharge, noise,
glare, fumes, smoke, dust, and/or auto, truck traffic) which could otherwise create a nuisance
or unsafe or unhealthy conditions. Lighting shall comply with Article 6, Section 9.G., and
lighting fixtures must be installed to project light downward and not outward. The proposed
development will not cause unreasonable erosion, sedimentation, or reduction in the capacity
of the land safely to hold, absorb, or transpire water so that a dangerous or unhealthy
condition results. Consulting a soil scientist/engineer or similar professional may be
required. The construction will comply with all federal, state, and local laws, including air
and water pollution control laws and regulations.
F. When necessary to protect the privacy of neighboring residents and the integrity of the area,
the Planning Board may require a planting strip of up to 50 feet in width at the property lines
at the periphery of the development. The planting strip shall be so designed as to screen the
project and subsequent project activities from view of the public, where appropriate, and from
adjoining property owners. Non-residential yard space abutting a residential area shall be
maintained as a buffer strip by the developer.
G. All approved outside storage areas, exposed machinery installation, service areas, truck
loading areas, utility, and similar structures shall have sufficient setbacks and screening to
provide an audio-visual buffer sufficient to eliminate their adverse impact on the other land
uses within the development area and surrounding properties.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 2
Performance Standards
H. Dwellings to be converted, as well as any structural alterations must maintain the appearance
of their existing use as determined by the Planning Board. New buildings shall be designed
and constructed so as to preserve the primary character of the neighborhood. The Planning
Board may make suggestions regarding facade materials and their texture (e.g., vinyl or wood
clapboards, shingles, patterned shingles, brick). The layout of parking areas, service areas,
entrances, exits, yards, signs, or lighting shall be such as to protect the existing character of
the district and any adjoining district.
I. The proposed use will not create or aggravate hazards to traffic on the roads and sidewalks
serving the proposed use. To limit the proliferation of access points to public highways now
controlled by the state Department of Transportation, and the resultant traffic hazards and
congestion, a developer may be required to dedicate a 50 foot strip adjacent to and running
the length of the project along the public highway to the use of controlled public access and
landscaping. If required, such strip could be considered as part of the required setback, and
shall be constructed in accordance with town standards. The developer shall file with the
town a performance guarantee in an amount sufficient to defray the cost of improving the
strip. The conditions and amount of such performance bond shall be determined by the town
manager with the advice of the various municipal departments and agencies concerned.
J. The proposed development will not place an undue burden on the ability of municipal or
other governmental agencies to provide services or facilities, including, but not limited to
sewer, water, elementary and secondary schools, fire protection, road maintenance, solid
waste disposal, police protection, telephone and electrical facilities, municipal road systems,
or fire department.
K. Where possible, the site design will preserve specimen or long-lived tree species and existing
watercourses, hills, and other natural features. The services of a professional forester,
arborist, soil scientist/engineer may be required.
L. Exterior signs or outdoor advertising structures shall not detract from the surrounding
properties. Signs or structures shall conform to requirements specified under section 12 of
this article, but in addition shall be reviewed for the following: size, location, design, lighting,
materials, illumination, colors, and scale. Minor changes that do not alter the dimensions or
lettering style of an existing sign need not be reviewed. One sandwich, portable, or other
temporary sign of advertisement, not illuminated, shall be permitted. Such sign shall be no
larger that six square feet, and shall be displayed for no more than 30 days.
M. Provisions shall provide convenient and safe emergency vehicle access to all structures at all
times.
2.
COMMERCIAL REMOVAL OF EARTH MATERIALS
Sand, gravel, rock, and similar earth materials may be removed commercially from districts
where permitted under the terms of the Ordinance only after site plan review and approval.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 3
Performance Standards
Following such approval, a permit may be issued by the Code Enforcement Officer. The applicant
shall be required to:
A.
Restore the site by regrading and seeding with adequate preparation to assure growth of
vegetation cover.
B.
No earth removal, quarrying, or mining activity will be conducted within 20 feet of a
property line, unless a greater distance is specified elsewhere in this Ordinance, or by
State guideline, rule, or statute. A slope not to exceed 1 to 1 ratio and above-ground
accumulation of earth materials will be maintained on all excavation.
C.
If such earth removal activity is not of continuous nature (excluding shutdown through
the winter season) the operator must renew the land use permit every two years from the
date of issue and show why he should not restore all or part of the site at that time.
D.
The Planning Board may require the applicant to post a bond with the Treasurer of the
municipality in an amount approved by the Planning Board as sufficient to guarantee
conformance.
3.
FLOOD PLAIN AND/OR MUD SLIDE HAZARD AREAS
In addition to the specific requirements of any district the following provisions will apply in any
areas designated as flood plain hazard areas. The Code Enforcement Officer shall review all
building permit applications to determine whether proposed building sites will be reasonably safe
from flooding. Any construction, relocation, replacement or substantial enlargement or
modification of any building, including prefabricated and mobile homes upon building sites in
the special flood hazard areas must:
A. Be designed or modified and anchored to prevent flotation, collapse, or lateral movement of
the structure.
B. Use construction material and utility equipment that are resistant to flood damage, and
C. Use construction methods and practices that will minimize flood damages.
The following provisions will apply in areas designated mud slide hazard areas:
D. A review of the site must be made by persons qualified in geology and soils engineering.
E. The proposed construction, substantial improvement, grading or earth removal must:
1.)
be adequately protected against mudslide damage, and
2.)
not aggravate the existing hazard.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 4
Performance Standards
4.
GROUP DEVELOPMENTS
A group development is permitted provided that:
A. Uses shall be limited to those permitted within the district in which it is located.
B. Density and height requirements of the district are met.
C. The distance of every building from the nearest property line shall meet all requirements of
the district in which the project is located. The development shall abut a public street for a
minimum of 150 feet, and all structures shall be set back at least 150 feet from said street.
D. The Planning Board shall approve the location of the group development.
5.
HOME OCCUPATION
The following provisions shall govern home occupations in the R, C, MR-C and Shoreland
residential districts:
A. Permitted home occupations shall be carried out without altering the residential character of
the structure or neighborhood, or changing the character of the lot from its principal use as a
residence. A home occupation shall be permitted only if it totally complies with all of the
requirements of this subsection.
B. A home occupation shall be carried on by the full time occupants of the dwelling unit and no
more than two additional employees.
C. The home occupation shall be carried on wholly within the principal home or accessory
structure and shall not use more than 25% of the ground floor area of the structure or
accessory structure being used.
D. Intentionally left blank
E. There shall be no external evidence of such operation except one non-illuminated, nonrelative
sign, no larger than four (4) square feet in area, and no home occupation shall involve the use
of advertising media on the premises, which calls attention to the fact that the home is being
used for business purposes, telephone number listing excepted (see Article 4, Section 12,
Subsection C).
F. The sale of products shall be limited to those which are mailed (e.g. FederalExpress, UPS
etc.), catalog items ordered off the premises by customers, to items which are accessory or
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 5
Performance Standards
incidental to a service which is provided on the premises and manufactured items made on
the premises.
G. Adequate off-street parking shall be provided. See Article 4 Section 9- Subsection L, Off-
Street Parking
The following provisions (H-M) shall govern home occupations in the RF district:
H. Rural home occupations shall be carried out without altering the basic character of the
structure or neighborhood, or changing the character of the lot from its principal use as stated
in the intent and purposes of the district. A rural home occupation will be permitted only if
it totally complies with all the requirements of this subsection.
I. A home occupation shall be carried on by the full time occupants of the dwelling unit and
no more than three additional employees.
J. The home occupation shall be carried on within the principal structure and shall not exceed
25% of the ground floor area of that principal structure, or for accessory structure see below:
1.)
2-4 acre lot: Accessory Structure no larger than home structure in area or volume.
2.)
5 acre lot or larger: Accessory Structure shall not exceed a total of 25% lot area.
K. There shall be no visible external evidence of such operation from a public way except one
non-illuminated, non-reflective sign, no larger than four (4) square feet in area, and no home
occupation shall involve the use of advertising media on the premises which calls attention
to the fact that the home is being used for business purposes, telephone number listing
excepted. See Article 4, Section 12, Subsection C, Signs, for setback criteria for all signs.
L. The sale of products shall be limited to those which are mailed (e.g. FedEx, UPS, etc.),
catalog items ordered off the premises by customers, to items which are accessory or
incidental to a service which is provided on the premises and manufactured items made on
the premises.
M. Adequate off-street parking shall be provided. See Article 4, Section 9, Subsection L, Off
Street Parking.
6.
JUNK YARDS AND AUTOMOBILE GRAVEYARDS
Junk yards and automobile graveyards, where permitted under the terms of this Ordinance, must
be approved by the Planning Board in addition to fulfilling the requirements of MRSA Title 30A,
Sections 3751-3760.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 6
Performance Standards
7.
MOBILE HOME PARKS
A.
The application for a permit, to be submitted to the Planning Board for site plan review,
shall show:
1.)
The area and dimensions of the tract of land.
2.)
The number, size, and location of mobile home lots.
3.)
The location and width of roadways.
4.)
The location of water and sewer lines.
5.)
Such further information as may be requested by the Building Inspector, Code
Enforcement Officer, Planning Board, or Health Officer to determine that the
mobile home park complies with legal requirements.
B.
Minimum locational standards: A mobile home park shall be:
1.)
Free from adverse influence by wetlands or waste disposal areas.
2.)
Not subject to flooding or other hazard or nuisance as determined by the Planning
Board.
C.
Minimum general standards:
1.)
A mobile home park shall contain no less than 5 acres.
2.)
A mobile home site shall contain no less than 15,000 square feet with a street/road
frontage of at least 100 feet; a concrete pad or foundation shall be installed on
each site; and each unit must be firmly anchored by tie-downs.
3.)
Mobile homes shall be separated from each other by at least 25 feet.
4.)
The ground surface in all parts of the mobile home park shall be graded and
equipped to drain all surface water in a safe, efficient manner.
5.)
Exposed ground surfaces in all parts of every mobile home park shall be paved or
covered with stone screenings or other solid material, or protected with a
vegetative growth that is capable of preventing soil erosion and the emanation of
dust during dry weather.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 7
Performance Standards
6.)
Every mobile home park shall have a continuous, safe, and potable water supply
capable of delivering no less than 150 gallons of water per day for each mobile
home site at suitable pressure with a connection at each mobile home site.
7.)
Every mobile home park shall be provided with an adequate and safe sewage
disposal system, with a sewer connection at each mobile home site.
8.)
Every mobile home park shall contain an electrical system, consisting of wiring,
fixtures, equipment and appurtenances which shall be installed and maintained in
accordance with applicable codes and regulations governing such systems. Each
mobile home site shall be provided with an approved electrical service.
9.)
The storage, collection, and disposal of refuse in every mobile home park shall be
managed so as to create no health hazards, rodent harborage, insect breeding
areas, accident or fire hazard, or air pollution.
10.)
Not less than 8% of the gross area of the park site shall be devoted to recreational
facilities which may include playgrounds, ball field, ornamental areas, and
community buildings.
D.
Minimum street standards
1.)
All streets in a mobile home park shall be provided with a well-drained and
durable surface of minimum width of 24 feet. Street surfaces shall be maintained
and snow-plowed by the mobile home park operator.
2.)
Safe, continuous, and convenient vehicular access shall be provided from abutting
public streets or roads into the mobile home park and within the park to each
mobile home space.
3.)
Grades of all streets shall be sufficient to insure adequate surface drainage but
shall not be more than 8 percent.
4.)
Intersections of streets shall be at approximately right angles.
5.)
Street lighting shall be provided as approved by the Planning Board.
8.
OFF-STREET LOADING AND UNLOADING
On every lot on which a business, trade, or industry is hereafter established, sufficient off-street
space with access to a public right-of-way shall be provided for the loading and unloading of
vehicles, and shall not obstruct traffic flow.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 8
Performance Standards
9.
OFF-STREET PARKING
No building hereinafter shall be erected or any of the following uses established unless the
minimum number of off-street parking spaces as specified below are provided. Adequate off-
street parking must be provided to insure no vehicles need be parked along the roadway. Each
parking space shall be at least 200 square feet and shall have access for vehicles to a public right-
of-way. Parking lots for more than 5 vehicles shall provide sufficient turning space to prevent
cars from backing into the street.
If the required automobile parking spaces cannot be provided on the same lot as the principle
use, such spaces may be provided on other off-street property located within 400 feet of the main
entrance of the principle use. Such parking space shall be associated with principle use, and not
thereafter reduced or encroached upon in any manner.
Required parking space may extend up to 100 feet in a residential district provided that the
parking space adjoins a commercial or industrial district, has its only access on the same street
as the property for which it serves, and is separated from abutting residences by a planted buffer
strip at least 10 feet wide.
A.
Gasoline Filling Stations and Repair Garages - 5 spaces for each grease rack or other
similar facility.
B.
Hospitals and Nursing Homes - 1 space for each 4 beds.
C.
Hotels - 1 space for each 2 guest bedrooms.
D.
Industrial Establishments - 1 space for each 2 employees at maximum employment on
the 2 shifts of highest employment.
E.
Lodges and Clubs - 1 space for each 5 members.
F.
Motels - 1 space for each accommodation.
G.
Offices - 1 space for each 300 square feet of office floor space.
H.
Places of Amusement or Assembly - 1 space for each 150 square feet of floor area devoted
to patron use.
I.
Residential - 1 space for each dwelling unit.
J.
Restaurants - 1 space for each 3 seats.
K.
Schools - 1 space for each 30 pupils in primary schools; 1 space for each 4 students in
secondary schools; and 1 space for each student in higher education.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 9
Performance Standards
L.
Museum - Parking 1 space for each 500 square feet of floor area devoted to patron use (a
minimum of 2 parking spaces).
M. Other uses - sufficient space to meet the projected needs of the development.
10.
PRINCIPAL AND ACCESSORY BUILDINGS AND USES OF A LOT
Except group developments, only one principle building and its accessory buildings and uses
may hereafter be erected or constructed on any one lot.
A.
Change of Use: An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the
subject and adjacent properties and resources, than the former use, as determined by the
Planning Board. The determination of no greater adverse impact shall be made according
to the criteria listed in Article 3. Section 5.A.4.
11.
PUBLIC FACILITIES (FEDERAL, STATE AND MUNICIPAL)
Federal, State, Municipal, Public, grounds and public schools are permitted per Article 2 subject
to the site plan review and the approval of the Planning Board, except as prohibited in Article 3.
Section 7.
12.
SIGNS
A.
No sign shall be permitted except as specified in this Ordinance. All illuminated signs
erected or maintained shall be illuminated by non-intermittent light or lights. No
illuminated signs shall be of the intensity or brilliance to cause a glare or impair the vision
of the operator of any motor vehicle or otherwise constitute a hazard to pedestrian or
vehicular traffic.
B.
No outdoor advertising shall hereafter be erected off premises, except that a business
operating in conformance with the Land Use Ordinance of the Town of Orrington is
permitted to place Official Business Directional Signs (OBDS) as defined by and in
compliance with Title 23, MRSA 1901-1925, Maine Traveler Information Service Act,
under the conditions set forth in Table 4-1 and excepting temporary signs, maximum of
two per road not to exceed six and complying with table 4-1.
C.
Setbacks for signs in all Districts (OBDS signs are exempt per MDOT placement):
Setbacks for signs in all districts shall be eight (8) feet from right of way and twenty (20)
feet from side property lines.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 10
Performance Standards
D.
Height: no portion of any sign, either free standing, attached, detached, or affixed,
whether permanent or temporary, to any wall of a building or roof shall exceed twenty-
five (25) feet in height above the natural grade upon which it is erected.
E.
The following standards listed in, and appended to, Table 4-1 shall apply to signs in the
respective districts. The dimension of a Skeletonized sign shall be determined using the
maximum vertical and horizontal plane or surface dimensions created by the displayed
letters and not just the cumulative face area of the letters.
Table 4-1. Permitted signs by type and district
Type of Sign
R (15)
RF (15)
MR-C
C (16)
I
CPD21
SR, SI,
SP, RP
Traffic Regulatory Signs
(1)
(1)
(1)
(1)
(1)
(1)
Official Business Directional
Signs - OBDS
12" x 48"
(2)
12" x 48"
(2)
12" x 48"
(2)
12" x 48"
(2)
12" x 48"
(2)
12" x 48"
(2)
No Trespassing/No Hunting (3)
1 sf
1 sf
1 sf
1 sf
1 sf
1 sf
Illuminated
(13)
(13)
(13)
(13)
(13)
na
Temporary Construction,
Renovation, or Repair (5)
16 sf
16 sf
16 sf
16 sf
16 sf
16 sf
Temporary (public or semi-
public occasional events,
athletic events, political
campaigns, candidate,
sales/marketing) (6)
(14)
(14)
(14)
(14)
(14)
(14)
Real Estate (7)
6 sf
6 sf
6 sf
32sf
32sf
3sf
Conforming nonresidential
principal building or use on the
premises (e.g. Town Hall,
school, church)
32sf
32sf
32sf
32sf
32sf
6 sf (4)
Home Occupations (20)
4 sf
4 sf
4 sf
4 sf
4 sf
4 sf
Describing farm products
raised or produced on the
premises
16 sf
32 sf
16 sf
32 sf
na
8 sf
Multi-Family Housing
12sf
12sf
12sf
na
na
na
Subdivision
32 sf
32 sf
32 sf
32 sf
32 sf
na
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 11
Performance Standards
Type of Sign
R (15)
RF (15)
MR-C
C (16)
I
CPD21
SR, SI,
SP, RP
Entrance (free standing) (19)
na
na
24 sf (8)
24 sf (8)
50 sf (8,9)
(10)
Projecting or extending (not
flush, parallel or co-planar with
walls) and below roof line (12).
na
na
6 sf
6 sf
32 sf
na
Wall (co-planar, on, flush, or
parallel to the wall and below
the roof line (12)) (11)
6 sf
6 sf
6 sf
1 sf/lf of
building
frontage
1-1/2sf/lf
of
building
frontage
(11)
na
Shopping Centers (17)
na
na
24sf (8)
(18)
24sf
(8)(18)
na
na
sf = square foot. lf = linear foot. na = not allowed.
1. These shall consist of but shall not be limited to: stop, yield, curve, speed limit. Permitted
location and design shall be as seen fit by the Road Commissioner and/or MDOT without
restriction.
2. A maximum of 3 off premises signs shall be permitted if approved with Maine Department of
Transportation (MDOT) application. Signs shall be Non-reflectorized white lettering on a blue
background. The location of all such signs shall be approved on an individual basis by the
Planning Board using the OBDS application, after submission and approval by the MDOT.
3. These signs shall be permitted without restriction as to the number of signs provided that there
shall be not more than one sign per 50 linear feet of lot perimeter and an additional sign shall
be permitted at each point of access from a public road.
4. The number of signs shall be limited to 2 for the premises, each not to exceed 6 sf in size.
5. A single sign which denotes the architect, engineer, contractor, and/or funding source for the
work in progress. Such sign shall be removed, at the earlier of, when work is complete or when
a certificate/authorization of use/occupancy is granted (either written or verbally by the CEO).
Federal and State government mandated signs are exempt.
6. Such sign shall be displayed no more than three weeks before the event and shall be removed
within one week after the event. In no event shall a temporary sign be displayed for greater
than 30 days and no more than three events per calendar year. The temporary signs may
include, but not be limited to: banner, flag, inflatable, and sandwich board. Signs classified as
sales and/or marketing shall include, but not be limited to, those for Grand Openings,
Promotionals, Seasonal Sales, Liquidations, Change in Ownership/Management, Going out of
Business.
7. Real Estate signs are those relating to the advertisement of sale, rental, or lease of the premises
on which the sign is located. Real estate signs within the stream, shoreland and resource
protection districts are restricted to a maximum size of 3 sf per State Shoreland Zoning
Ordinance. Temporary signs of a directional nature are not covered by this item.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 12
Performance Standards
8. In addition each business on the premises may display a single sign attached to the entrance
sign, identifying the name of the business and services it provides. Such signs shall not exceed
6 sq. ft.
9. Businesses in the Industrial and the Commerce Parks, as defined, may erect one detached or
free standing sign not exceed 40 sq. ft.
10. Unless otherwise prohibited sign guidelines for the Industrial District shall be used for the SI
district. Districts SP, RP, and SR are not included in this item.
11. The aggregate area of all wall signs on the premises shall not exceed 200 sq. ft.
12. The phrase "roof line" shall refer to the nominal elevation of the roof ridge or parapet and the
highest point of elevation of the sign.
13. Any illuminated sign, as permitted, but not limited to sections 4-5E, 4-5K, and 4-12A, shall
only be illuminated during hours of public operation. Illuminated signs shall have a static
display (no animation, changing colors, varying illumination intensity or aiming), except for
time, temperature, or DOT traffic control/advisory signs. Such signs shall not be positioned, or
of a color or intensity, as to compete with traffic control devices.
14. 6 square foot maximum display size, unless further limited elsewhere in this ordinance, or by
express written permission by the CEO or PB. Campaign or candidate signs shall be limited to
one sign per sponsor or candidate per location (per 250 ft in any direction).
15. Signs shall be considered accessory to the principal use of the premises on which they are
located.
16. In the commercial district signs may be located on any part of the premises not otherwise
restricted in these articles, and may be attached, detached, or projecting signs, single or double
faced, identifying uses or goods sold or services rendered on the premises.
17. Each shopping center, as defined, may display a shopping center sign not to exceed 24 sq. ft.
naming the shopping center.
18. In shopping centers, as defined, each store or shop may have a flush mounted, projecting or
roof sign not to exceed 36 sq. ft. displaying the name of the store or shop. Maximum width or
height not to exceed eight feet.
19. One sign per entrance.
20. See Article 4, Section 5, subsection E. or Article 4, Section 5, sub-section K for requirements in
their respective district.
21. The Commerce Industrial Park may have a sign not to exceed 100 sq. ft. displaying the name of
the Park and businesses within the Park.
13.
REQUIREMENTS FOR CAMPGROUNDS AND TRAVEL TRAILER PARKS
Campgrounds and travel trailer parks may be established in districts permitted under the terms
of this Ordinance provided that:
A.
No campground or travel trailer park may be established or operated without a permit
issued annually by the Code Enforcement Officer for which the applicant shall pay a fee
of $1.00 per travel trailer site, camp site, or tent site. Such permit shall only be issued if
the campground or travel trailer park is found to conform to the requirements of this
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 13
Performance Standards
Ordinance and all other pertinent municipal and state ordinances and after approval of the
proposed plan of such campground or trailer park by the Planning Board.
B.
Camping areas shall contain a minimum of 5,000 square feet of suitable land, excluding
common areas, roads and driveways, for each trailer or tent site.
C.
Fires shall be permitted only in specifically designated fireplaces constructed to suitable
standards, and only under conditions and at times approved by the Fire Chief.
D.
Service facilities which meet the following specifications shall be provided and
continuously maintained in clean and sanitary condition and in good operating order at
all times when the campground or trailer park is open for business.
1.)
One water connection able to deliver a continuous, adequate, safe and potable
supply of water located not more than 200 feet from every trailer, camping, or
tenting site.
2.)
One flush-type or chemical toilet for each 5 sites.
3.)
Adequate and safe sewage disposal facilities.
4.)
The storage, collection and disposal of refuse shall be so managed as to create no
health hazards, rodent harborage, insect-breeding areas, accident or fire hazard,
or air pollution.
14.
Cluster Development Standards
Purpose:
The purpose of cluster development is to encourage the preservation of the rural character of the Town
of Orrington by preserving undeveloped land, to include forested land, farmland, and other
undeveloped land within the Town. This can be accomplished by allowing cluster type development,
which allows homes to be built on lots which are smaller than required in the Land Use District, but
requires undeveloped portion of the lot to be preserved.
Note: Cluster development streets and utility lines are usually shorter, thus allowing development at a
lower construction cost initially and lower maintenance costs in the future.
Location and Density:
Cluster development shall only be allowed in the Rural Residence and Farming District. Cluster
development is not allowed within Shoreland Districts nor within designated Flood Zones. Land within
Shoreland Districts may be used in calculating the allowed density for a project that is located partially
within the Shoreland Districts and partially outside of the Shoreland Districts, but no lot development
shall occur within the Shoreland District.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 14
Performance Standards
Cluster development shall mean a development of single family, two-family and multi-family
residential homes that permit lots with dimensions, widths, and setbacks reduced from conventional lot
size developments, provided that the density of the parcel as a whole shall not be greater than the
density allowed by the Land Use District for non-cluster development. The remaining area shall be
retained as permanently preserved open space. The Planning Board must make positive findings that
the cluster approach will provide a development plan which provides and supports the preservation of
open space and prevents the loss of natural features to the greatest extent possible.
Application Procedure:
The application procedure for Cluster Subdivisions shall be the same as conventional subdivisions. The
number of lots or development shall in no case exceed the number of lots or dwelling units permitted
in a standard subdivision submission within the Rural Residence and Farming District.
Calculating Developable Acreage
Total acreage and land suitable for development (Net Residential Acreage) shall be calculated the same
as conventional subdivisions. Each lot must have a minimum of one acre (43,560 square feet) of
developable area.
- Wetlands are not to be considered as developable area when calculating total acreage.
- Surface Water is not to be considered as developable area when calculating total acreage.
- Portions of the lot designated as Flood Plain are not to be considered as developable area when
calculating total acreage.
- Right-of-ways are not to be considered as developable area when calculating total acreage.
Site Design Standards:
A. Cluster development must meet all the criteria requirements for a subdivision other than those
land use standards that may be modified, and all other applicable town ordinances.
B. Each building must be an element of the overall plan for site development. The developer must
specify the placement of building envelopes and the treatment of open spaces, paths, roads,
utility services and parking.
C. A soil survey must be submitted. No building may be constructed on soil classified as being
very poorly drained.
D. No building shall be located within 100 feet of a designated wetland or waterbody.
E. No house lot shall be less than one acre (43,560 square feet).
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 15
Performance Standards
F. The land to be set aside for open space does not have to be contiguous with the house lot,
provided that the required amount of land for each lot is located somewhere on the parcel to be
subdivided as a cluster.
G. All open space shall be considered common land and the interest shall be divided equally
among all land owners.
H. Minimum lot width for each lot shall not be less than one hundred and fifty feet (150') at the
building line.
I. No individual lot or dwelling unit may have direct vehicular access onto a public road existing
at the time of development.
J. Based on the recommendation of the Fire Chief, the developer may be required to provide
underground storage capacity of first responder water supply or in lieu of, a mutually agreed
upon payment to the Fire Department capital account for the establishment of strategically
located "first responder water" infrastructure. Maintenance of these facilities to be the
responsibility of a Home Owners Association, developer, or town if deemed public property.
K. Utilities may be installed underground.
L. As with conventional subdivisions, the test pit locations of all subsurface wastewater disposal
systems must be shown on the plan. In addition, an equivalent reserve area for replacement
systems must be shown. These reserve areas must be deed restricted with language not
allowing any construction such as decks, storage buildings, pools, and the like within the
replacement areas.
M. In order to facilitate State requirements for separation distances between drinking water wells
and septic systems, private drinking water wells may be located in areas designated as open
space if necessary.
Creation and Maintenance of Open Space and Any Common Facilities:
Open space may not be further developed. Open space may only be used for agriculture, forestry
conservation, or non-commercial recreation. Upland areas of the open space may be used as storage or
stockpile areas during construction of the development, provided that the area is restored to a condition
similar to that which existed prior to commencement of the development.
June 6, 2005 rev. April 13, 2009, June 6, 2011, June 3, 2013 June 2, 2014, June 1, 2015, June 6, 2016, June 6, 2022,
June 5, 2023
4 - 16
Performance Standards
Restoration:
The applicant shall delineate the limits of stockpile and storage areas on the plan and provide a
restoration plan for those areas specifying grading, topsoil specifications and plantings as appropriate.
Homeowner Association:
The plan shall include provisions for the creation of a Homeowners Association as with any
conventional subdivisions within Orrington.
15.
YARD SALE
Yard sales will be allowed in all areas. They shall not occur on more than two weekends in a
calendar year and not exceed three consecutive days. Yard sales occurring on heavily traveled
roads are required to post warning signs.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 1
ARTICLE 5 -- ADMINISTRATION, ENFORCEMENT AND PENALTIES
1.
ADMINISTRATION
A.
Administering Bodies and Agents
1.)
Code Enforcement Officer
Unless otherwise provided in this Ordinance, the Code Enforcement Officer
(CEO), as duly appointed by the Town Manager and confirmed by the Board of
Selectmen, shall administer and enforce this Ordinance. No building permit or
certificate of occupancy shall be issued by the Code Enforcement Officer except
in compliance with the provisions of this Ordinance. The Code Enforcement
Officer shall have the following duties, among others, in enforcing this Ordinance:
a. Preliminary plans. Examine preliminary plans.
b. Applications and fees. Act upon all applications and collect any fees due; refer
and or process all applications as required.
c. CEO applications. Act upon building, construction and use applications which
are under the jurisdiction of the CEO as set forth in Article 2. Section 5,
District Requirements and Article 3. Section 7, Table of Land Uses.
d. Planning Board applications. Review site plan review applications,
subdivision
applications
and
hazardous
materials
applications for
completeness of submissions and refer such applications to the Planning
Board; and
e. Board of Appeals applications. Refer requests for variances and
administrative appeals to the Board of Appeals.
f. Inspections. Inspect sites where building permits have been issued to ensure
compliance with all local, state and federal laws, codes and/or ordinances.
g. Complaints and violations. Investigate complaints and reported violations.
h. Reports and records. The Code Enforcement Officer shall keep a complete
record of all essential transactions of the office, including applications
submitted, permits granted or denied, variances granted or denied, revocation
actions, revocation of permits, appeals, court actions, violations investigated,
violations found, and fees collected. On a biennial basis, for permits and
activities in Shoreland, Stream, and Resource Protection Districts, a summary
of these records shall be submitted to the Director of the Bureau of Land and
Water Quality Control within the Maine Department of Environmental
Protection.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 2
i. Violation notices. Issue violation notices.
j. Appeals. Participate in appeals procedures.
k. Consent agreements. Process or act on consent agreements involving
violations of this Ordinance or appear in court when necessary.
l. Agendas. Prepare agenda for mailing at least seven days before each meeting
of the Planning Board and Board of Appeals, and attend meetings of the
Planning Board and Board of Appeals.
m. Permit revocation. Revoke a permit after notice if it was issued in error or if
it was based on erroneous information.
When there is a question concerning the interpretation of this Ordinance, the Code
Enforcement Officer may refer the matter to the Board of Appeals for
interpretation.
2.)
Board of Appeals
A Board of Appeals has been created. See Article 8 Section 8.04 of the town
charter.
3.)
Planning Board
a.
Creation. A Planning Board has been created. See Article 8 Section 8.03
of the town charter.
b.
Powers and duties. The Planning Board shall be responsible for reviewing
and acting upon applications for site plan review as set forth in Article 2.
Section 5, Article 3. Section 7, and in accordance with the provisions of
Article 6, and subdivisions in accordance with the provisions of Article 6
of this Ordinance, as well as certain Shoreland Land Use applications in
accordance with the provisions of Article 3. Following approval by the
Planning Board, the applicant shall return to the Code Enforcement
Officer for building and other permits.
c.
Activities covered by Shoreland Land Use requirements. After
submission of a complete application to the Planning Board, the Board
may approve said application or approve it with conditions if it makes a
positive finding based on the information presented that the proposed
use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface
waters;
(3) Will adequately provide for the disposal of all wastewater;
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 3
(4) Will not have an adverse impact on spawning grounds, fish, aquatic
life, bird or other wildlife habitat;
5) Will conserve shore cover and visual, as well as actual, points of
access to inland and coastal waters;
(6) Will protect archaeological and historic resources as designated in the
comprehensive plan;
(7) Will not adversely affect existing commercial fishing or maritime
activities in a Commercial Fisheries/Maritime Activities district;
(8) Will avoid problems associated with flood plain development and
use; and
(9) Is in conformance with applicable provisions of Maine DEP Section
15, Land Use Standards and the Orrington Land Use Ordinance.
If a permit is either denied or approved with conditions, the reasons as
well as conditions shall be stated in writing. No approval shall be granted
for an application involving a structure if the structure would be located
in an unapproved subdivision or would violate any other local ordinance,
or regulation or statute administered or any State law by the municipality.
2.
PERMITS REQUIRED
A.
Permit required.
It shall be unlawful, without first obtaining a permit, to engage in any activity or use of
land or structure requiring a permit in the district in which such activity or use would
occur; or expand, change, or replace an existing use or structure. A person who is issued
a permit pursuant to this Ordinance shall have a copy of the permit on site while the work
authorized by the permit is performed. A permit shall be required for:
1.)
Activities listed in the Table of Land Uses. Any activity listed in Article 2
Section 5, District Requirements, as requiring a permit from the Code
Enforcement Officer. No permit may be issued under this provision for any
activity which is part of a project requiring site plan review until such approval
has been granted by the Planning Board.
2.)
Site plan review activities. Any activity approved by the Planning Board under
the site plan review provisions of Article 6.
3.)
Shoreland Land Use. Any activity listed in Article 3. Section 7 as requiring a
permit from the Code Enforcement Officer. No permit may be issued under
Article 3 for an activity requiring Planning Board approval until approval for such
a permit has been granted by the Planning Board.
4.)
Floodplain management activities. Any activity listed in Article 7 as requiring
a permit from the Code Enforcement Officer.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 4
B.
Permit Application
1.)
Written application. Every applicant for a permit shall submit a written
application, including a scaled site plan, on a form provided by the municipality,
to the appropriate administrating body or agent. The following items, when
appropriate, shall be included on the site plan.
a.
The shape, size and location of the lot to be built upon and structure(s) to
be erected, altered or removed.
b.
Any structure(s) already on the lot.
c.
Depth of front yards of structure(s) and adjoining lots.
d.
Statement of intended use.
e.
Any other information needed by the Code Enforcement Officer, Planning
Board, or the Board of Appeals to determine whether the provisions of this
Ordinance are being observed.
2.)
All applications shall be signed by the owner of the property or individual who
can show evidence of right, title or interest in the property or by the owner's legal
agent, representative, or contractor of the owner with authorization from the
owner to apply for a permit hereunder, certifying that the information in the
application is complete and correct.
3.)
Application to be dated. All applications shall be dated, and the Code
Enforcement Officer or Planning Board, as appropriate, shall note upon each
application the date and time of its receipt and at such time and date as is acted
upon.
4.)
Plumbing permit. If the property is not served by a public sewer, a valid
plumbing permit or a completed application for a plumbing permit, including the
site evaluation approved by the Plumbing Inspector, shall be submitted whenever
the nature of the proposed structure or use would require the installation of a
subsurface wastewater disposal system.
5.) Intentionally left blank
6.)
Modifications. Any modification to the description, scale drawing, or site plan
of the proposed structure(s) shall require a revised application, payment of an
additional one-half of the application fee, and a permit prior to beginning, or
continuing, the work.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 5
3.
PROCEDURE FOR ADMINISTERING PERMITS.
A.
Code Enforcement Officer Action
Within seven (7) working days of the date of receipt of a complete application for a
permit, the Code Enforcement Officer shall examine such application and physically
examine the premises to determine whether or not the proposed building, structure or use
would be in compliance with this Ordinance, except that in the event the value of the
work does not exceed five thousand dollars a permit shall be issued upon payment of the
required fee to the municipality without an inspection of the premises. (The
aforementioned exclusion based on monetary limits does not apply to permits or activities
within Shoreland, Stream, and Resource Protection Districts).
1.)
Referrals. All applications which require approval of the Planning Board or
action by the Board of Appeals shall within a period of thirty (30) days be referred
to the applicable board for action and public notice shall be given. After approval,
with or without conditions, by such Board, the Code Enforcement Officer shall
issue a building or use permit within seven (7) working days after being notified
of such approval.
2.)
Code Enforcement Officer Permits. In all other cases, the Code Enforcement
Officer shall within a period of seven (7) working days approve or deny such
applications for a permit in accordance with whether or not such proposed
building, structure or use complies with this Ordinance.
3.)
Written notification. If a permit is either denied or approved with conditions, the
reasons as well as conditions shall be stated in writing and provided to the
applicant within seven (7) working days. No approval shall be granted for an
application involving a structure if the structure would be located in an
unapproved subdivision or would violate any other local ordinance or regulation
or any State law which the municipality is responsible for enforcing. If a permit
is either denied or approved with conditions, the reasons as well as conditions
shall be stated in writing.
B.
Applicant Responsibility
1.)
Burden of proof. The applicant shall have the burden of proving that the
proposed land use activity is in conformity with the purposes and provisions of
this Ordinance.
2.)
Posting. Within seven (7) working days of receiving the permit, the applicant
shall conspicuously post any permit issued (or copy thereof), on the lot where the
activity will occur, at a location clearly visible from the public street or road, in
such a manner as to protect the permit or copy from degradation by the elements.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 6
C.
Expiration of Permit
If no substantial start of construction has been made in 1 year from the date the permit is
issued, the permit becomes invalid. The Code Enforcement Officer shall renew the
permit within 30 days after the expiration of permit upon payment of a fee as specified in
Article 5, Section 2.B.5. Otherwise the permit becomes invalid and application must
begin anew. In all shoreland districts, if a substantial start is made within one year of the
issuance of a permit, the applicant shall have one additional year to complete the building
exterior and soil stabilized, at which time the permit shall expire.
D.
Installation of Public Utility Service
No public utility, water district, sanitary district or any utility company of any kind may
install services to any new structure located in the shoreland district unless written
authorization attesting to the validity and currency of all local permits required under this
or any previous Ordinance, has been issued by the appropriate municipal officials.
Following installation of service, the company or district shall forward the written
authorization to the municipal officials, indicating that installation has been completed.
E.
Road culvert. A permit is not required for the replacement of an existing road culvert as
long as the replacement culvert is:
1.)
Not more than 25% longer than the culvert being replaced; and
2.)
No longer than 75 feet.
AND;
Provided that adequate erosion control measures are taken to prevent sedimentation of
the water, and that the crossing does not block fish passage in the water course.
F.
Archaeological Excavation. A permit is not required for an archaeological excavation
as long as the excavation is conducted by and archaeologist listed in the State Historic
Preservation Officer's level 1 or level 2approved list, and unreasonable erosion and
sedimentation is prevented by means of adequate and timely temporary and permanent
stabilization measures.
G.
Required Permit(s). Any permit required by this ordinance shall be in addition to any
other permit required by law or ordinance.
4.
CERTIFICATE OF OCCUPANCY REQUIRED
A Certificate of Occupancy issued by the Code Enforcement Officer is required in advance of
the use of:
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 6, 2016, June 6, 2022
Administration
5 - 7
A.
Any lot or change of the use thereof;
B.
A building hereafter erected or a change in the use of an existing building.
No certificate of Occupancy shall be issued unless the lot or building complies with all the
provisions of this Ordinance. A record of all Certificates of Occupancy shall be kept on file in
the Town Office and available for Public Inspection.
5.
ENFORCEMENT
A.
Violations. Any violation of this Ordinance shall be deemed to be a nuisance. It shall be
the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance. If
the Code Enforcement Officer shall find that any provision of this Ordinance is being
violated, he or she shall notify in writing the person responsible for such violation.
B.
Penalty. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who orders or conducts any activity in violation of this Ordinance shall be
penalized in accordance with Title 30-A, Maine Revised Statutes Annotated, Subsection
4452. The violator may be fined not exceeding $2,500 for each offense. Each day that
the violation occurs shall constitute a separate offense, beginning with the day following
notification by the Code Enforcement Officer of such Violation.
C.
Other remedies. If any building is constructed, altered, removed, or any building or land
is used in violation of this Ordinance the Building Inspector or any other appropriate
authority or any person who would be damaged by such violation, in addition to other
remedies may institute appropriate legal procedures to prevent and or abate such
violation.
D.
Unsafe buildings Any building or structure that may be or shall at any time hereafter
become dangerous or unsafe, shall, unless made safe and secure, be taken down and
removed, in accordance with provisions of Title 17 M.R.S.A. Section 2851.
E.
Legal obligations, as per MDEP, for permits and activities in Shoreland, Stream, and
Resource Protection Districts. When notification of violations does not result in the
correction or abatement of the violation or nuisance condition, the Municipal Officers,
upon notice from the Code Enforcement Officer, are hereby directed to institute any and
all actions and proceedings, either legal or equitable, including seeking injunctions of
violations and the imposition of fines, that may be appropriate or necessary to enforce the
provisions of this Ordinance in the name of the municipality. The municipal officers, or
their authorized agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this Ordinance and recovering
fines without Court action. Such agreements shall not allow an illegal structure or use to
continue unless there is clear and convincing evidence that the illegal structure or use was
constructed or conducted as a direct result of erroneous advice given by an authorized
municipal official and there is no evidence that the owner acted in bad faith, or unless the
removal of the structure or use will result in a threat or hazard to public health and safety
or will result in substantial environmental damage.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 1
ARTICLE 7 -- FLOODPLAIN MANAGEMENT LAND USE ORDINANCE
SECTION
PAGE
1.
PURPOSE AND ESTABLISHMENT ............................................................................ 7-2
2.
PERMIT REQUIRED ..................................................................................................... 7-2
3.
APPLICATION FOR PERMIT ....................................................................................... 7-3
4.
APPLICATION FEE AND EXPERT'S FEE .................................................................. 7-4
5.
REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS ............................................................................................................. 7-5
6.
DEVELOPMENT STANDARDS ................................................................................... 7-6
7.
CERTIFICATE OF COMPLIANCE ............................................................................. 7-13
8.
REVIEW OF SUBDIVISIONS AND DEVELOPMENT PROPOSALS ..................... 7-14
9.
APPEALS AND VARIANCES .................................................................................... 7-14
10.
ENFORCEMENT AND PENALTIES .......................................................................... 7-16
11.
VALIDITY AND SEVERABILITY ............................................................................. 7-17
12.
CONFLICT WITH OTHER ORDINANCES ............................................................... 7-17
13.
DEFINITIONS .............................................................................................................. 7-17
14.
ABROGATION ............................................................................................................. 7-22
15.
DISCLAIMER OF LIABILITY................................................................7-22
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 2
1.
PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Orrington, Maine are subject to periodic flooding, causing serious
damages to properties within these areas. Relief is available in the form of flood insurance as
authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of Orrington, Maine has chosen to become a participating community in
the National Flood Insurance Program, and agrees to comply with the requirements of the
National Flood Insurance Act of 1968 (P.L. 90-488, as amended) as delineated in this Floodplain
Management Ordinance.
It is the intent of the Town of Orrington, Maine to require the recognition and evaluation of flood
hazards in all official actions relating to land use in the floodplain areas having special flood
hazards.
The Town of Orrington has the legal authority to adopt land use and control measures to reduce
future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352, 4401-4407, and
Title 38 MRSA, Section 440.
The National Flood Insurance Program, established in the aforesaid Act, provides that areas of
the Town of Orrington having a special flood hazard be identified by the Federal Emergency
Management Agency and that floodplain management measures be applied in such flood hazard
areas. This Ordinance establishes a Flood Hazard Development Permit system and review
procedure for development activities in the designated flood hazard areas of the Town of
Orrington, Maine.
The areas of special flood hazard, Zones (Districts) A and AE, for the Town of Orrington,
Penobscot County, Maine, identified by the Federal Emergency Management Agency in a report
entitled "Flood Insurance Study - Penobscot County," dated July 19, 2023, with accompanying
"Flood Insurance Rate Map Penobscot County, Maine" dated July 19, 2023, which are hereby
adopted by reference and declared to be a part of this Ordinance.
2.
PERMIT REQUIRED
The Code Enforcement Officer shall be designated as the local Floodplain Administrator. The
Floodplain Administrator shall have the authority to implement the commitment made to
administer and enforce the requirements for participation in the National Flood Insurance
Program.
Before any construction or other development (as defined in Article 9), including the placement
of manufactured homes, begins within any areas of special flood hazard established in Section
1, a Flood Hazard Development Permit shall be obtained from the Code Enforcement Officer.
This permit shall be in addition to any other permits which may be required pursuant to the codes
and ordinances of the Town of Orrington, Maine.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 3
3.
APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted to the Code
Enforcement Officer and shall include:
A.
The name, address and phone number of the applicant, owner, and contractor;
B.
An address and a map indicating the location of the construction site;
C.
A site plan showing location of existing and/or proposed development, including but not
limited to structures, sewage disposal facilities, water supply facilities, areas to be cut
and filled, and lot dimensions;
D.
A statement of the intended use of the structure and/or development;
E.
A statement of the cost of the development including all materials and labor;
F.
A statement as to the type of sewage system proposed;
G.
Specification of dimensions of the proposed structure and/or development;
[Items H-K.2 apply only to new construction and substantial improvements.]
H.
The elevation in relation to the National Geodetic Vertical Datum (NGVD), North
American Vertical Datum (NAVD), or to a locally established datum in Zone (District)
A only, of the:
1.)
base flood at the proposed site of all new or substantially improved structures,
which is determined:
a.
in Zone (District) AE, from data contained in the "Flood Insurance Study
- Penobscot County, Maine," as described in Section 1; or,
b.
in Zone (District) A:
i
from any base flood elevation data from federal, state, or
other technical sources (such as FEMA's Quick-2 model,
FEMA 265), including information obtained pursuant to
Section 6.M. and Section 8.D.; or,
ii
in the absence of all data described in Section 3.H.1.b.(1),
information to demonstrate that the structure shall meet the
elevation requirement in Section 6.H.2.b., Section 6.I.2.a. or b.,
or Section.J.2.b.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 4
2.)
highest and lowest grades at the site adjacent to the walls of the proposed
building;
3.)
lowest floor, including basement; and whether or not such structures contain a
basement; and,
4.)
lowest machinery and equipment servicing the building; and,
5.)
level, in the case of non-residential structures only, to which the structure will be
floodproofed.
I.
A description of an elevation reference point established on the site of all developments
for which elevation standards apply as required in Section 6;
J.
A written certification by a Professional Land Surveyor, registered professional engineer
or architect, that the base flood elevation and grade elevations shown on the application
are accurate;
K.
The following certifications as required in Section 6 by a registered professional engineer
or architect:
1.)
a Floodproofing Certificate (FEMA Form 81-65, as amended), to verify that the
floodproofing methods for any non-residential structures will meet the
floodproofing criteria of Section 6.I.; and other applicable standards in Section
6;
2.)
a Hydraulic Openings Certificate to verify that engineered hydraulic openings in
foundation walls will meet the standards of Section 6. N.2.a.;
3.)
a certified statement that bridges will meet the standards of Section 6. O.;
4.)
a certified statement that containment walls will meet the standards of Section 6.
P.;
L.
A description of the extent to which any water course will be altered or relocated as a
result of the proposed development; and,
M.
A statement of construction plans describing in detail how each applicable development
standard in Section 6 will be met.
4.
APPLICATION FEE AND EXPERT'S FEE
A non-refundable application fee of $50.00 shall be paid to the Town Clerk and a copy of a
receipt for the same shall accompany the application.
An additional fee may be charged if the Code Enforcement Officer and/or Board of Appeals
needs the assistance of a professional engineer or other expert. The expert's fee shall be paid in
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 5
full by the applicant within 10 days after the town submits a bill to the applicant. Failure to pay
the bill shall constitute a violation of the Ordinance and be grounds for the issuance of a stop
work order. An expert shall not be hired by the municipality at the expense of an applicant until
the applicant has either consented to such hiring in writing or been given an opportunity to be
heard on the subject. An applicant who is dissatisfied with a decision to hire expert assistance
may appeal that decision to the Board of Appeals.
5.
REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS
The Code Enforcement Officer shall:
A.
Review all applications for the Flood Hazard Development Permit to assure that
proposed developments are reasonably safe from flooding and to determine that all
pertinent requirements of Section 6 (Development Standards) have been, or will be met;
B.
Utilize, in the review of all Flood Hazard Development Permit applications:
1.)
the base flood and floodway data contained in the "Flood Insurance Study -
Penobscot County, Maine," as described in Section 1;
2.)
in special flood hazard areas where base flood elevation and floodway data are
not provided, the Code Enforcement Officer shall obtain, review and reasonably
utilize any base flood elevation and floodway data from federal, state, or other
technical sources, including information obtained pursuant to Section 3.H.1.b.;
Section 6. M.; and Section 8.D., in order to administer Section 6 of this Article;
and,
3.)
when the community establishes a base flood elevation in a Zone (District) A by
methods outlined in Section 3.H.1.b.i., the community shall submit that data to
the Maine Floodplain Management Program.
C.
Make interpretations of the location of boundaries of special flood hazard areas shown
on the maps described in Section 1 of this Article;
D.
In the review of Flood Hazard Development Permit applications, determine that all
necessary permits have been obtained from those federal, state, and local government
agencies from which prior approval is required by federal or state law, including but not
limited to Section 404 of the Federal Water Pollution Control Act Amendments of 1972,
33 U.S.C. 1344;
E.
Notify adjacent municipalities, the Department of Environmental Protection, and the
Maine Floodplain Management Program prior to any alteration or relocation of a water
course and submit copies of such notifications to the Federal Emergency Management
Agency;
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 6
F.
If the application satisfies the requirements of this Ordinance, approve the issuance of
one of the following Flood Hazard Development Permits based on the type of
development:
1.)
A two part Flood Hazard Development Permit for elevated structures. Part I shall
authorize the applicant to build a structure to and including the first horizontal
floor only above the base flood level. At that time the applicant shall provide the
Code Enforcement Officer with an "under construction" Elevation Certificate
completed by a Professional Land Surveyor, registered professional engineer or
architect based on the Part I permit construction for verifying compliance with
the elevation requirements of Section 6, paragraphs H, I, or J. Following review
of the Elevation Certificate data, which shall take place within 72 hours of receipt
of the application, the Code Enforcement Officer shall issue Part II of the Flood
Hazard Development Permit. Part II shall authorize the applicant to complete
the construction project; or,
2.)
A Flood Hazard Development Permit for Floodproofing of Non-Residential
Structures that are new construction or substantially improved non-residential
structures that are not being elevated but that meet the Floodproofing standards
of Section 6.I.1. The application for this permit shall include a Floodproofing
Certificate signed by a registered professional engineer or architect; or,
3.)
A Flood Hazard Development Permit for Minor Development for all
development that is not new construction or a substantial improvement, such as
repairs, maintenance, renovations, or additions, whose value is less than 50% of
the market value of the structure. Minor development also includes, but is not
limited to: accessory structures as provided for in Section 6. L., mining, dredging,
filling, grading, paving, excavation, drilling operations, storage of equipment or
materials, deposition or extraction of materials, public or private sewage disposal
systems or water supply facilities that do not involve structures; and non-
structural projects such as bridges, dams, towers, fencing, pipelines, wharves and
piers.
G.
Maintain, as a permanent record, copies of all Flood Hazard Development Permit
Applications, corresponding Permits issued, and data relevant thereto, including reports
of the Board of Appeals on variances granted under the provisions of Section 9 of this
Ordinance, and copies of Elevation Certificates, Floodproofing Certificates, Certificates
of Compliance and certifications of design standards required under the provisions of
Sections 3, 6, and 7 of this Article.
6.
DEVELOPMENT STANDARDS
All developments in areas of special flood hazard shall meet the following applicable standards:
A.
All Development - All development shall:
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 7
1.)
be designed or modified and adequately anchored to prevent flotation (excluding
piers and docks), collapse or lateral movement of the development resulting from
hydrodynamic and hydrostatic loads, including the effects of buoyancy;
2.)
use construction materials that are resistant to flood damage;
3.)
use construction methods and practices that will minimize flood damage; and,
4.)
use electrical, heating, ventilation, plumbing, and air conditioning equipment,
and other service facilities that are designed and/or located so as to prevent water
from entering or accumulating within the components during flooding
conditions.
B.
Water Supply - All new and replacement water supply systems shall be designed to
minimize or eliminate infiltration of flood waters into the systems.
C.
Sanitary Sewage Systems - All new and replacement sanitary sewage systems shall be
designed and located to minimize or eliminate infiltration of flood waters into the system
and discharges from the system into flood waters.
D.
On Site Waste Disposal Systems - On site waste disposal systems shall be located and
constructed to avoid impairment to them or contamination from them during floods.
E.
Watercourse Carrying Capacity - All development associated with altered or relocated
portions of a watercourse shall be constructed and maintained in such a manner that no
reduction occurs in the flood carrying capacity of the watercourse.
F. Utilities - New construction or substantial improvement of any structure (including
manufactured homes) located within Zones (Districts) A and AE, shall have the bottom
of all electrical, heating, plumbing, ventilation and air conditioning equipment,
permanent fixtures and components, HVAC ductwork and duct systems, and any other
utility service equipment, facilities, machinery, or connections servicing a structure,
elevated to at least one foot above the base flood elevation.
G. Physical Changes to the Natural Landscape - Certain development projects, including
but not limited to, retaining walls, sea wall, levees, berms, and rip rap, can cause physical
changes that affect flooding conditions.
1.)
All development projects in Zones (Districts) AE and VE that cause physical
changes to the natural landscape shall be reviewed by a Professional Engineer
to determine whether or not the project changes the base flood elevation, zone,
and/or the flood hazard boundary line.
a. If the Professional Engineer determines, through the use of engineering
judgement, that the project would not necessitate a Letter of Map
Revision (LOMR), a certified statement shall be provided.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 8
b. If the Professional Engineer determines that the project may cause a
change, a hydrologic and hydraulic analysis that meets current FEMA
standards shall be performed.
2.)
If the hydrologic and hydraulic analysis performed indicates a change to the
base flood elevation, zone (district), and/or the flood hazard boundary line, the
applicant may submit a Conditional Letter of Map Revision (C-LOMR) request
to the Federal Emergency Management Agency for assurance that the as-built
project will result in a change to the Flood Insurance Rate Map. Once the
development is completed, a request for a Letter of Map Revision (LOMR)
shall be initiated.
3.)
If the hydrologic and hydraulic analysis performed show a change to the base
flood elevation, zone (district), and/or the flood hazard boundary line, as soon
as practicable, but no later than 6 months after the completion of the project,
the applicant shall submit the technical data to FEMA in the form of a Letter of
Map Revision request.
H.
Residential - New construction or substantial improvement of any residential structure
located within:
1.)
Zone (District) AE shall have the lowest floor (including basement) elevated to
at least one foot above the base flood elevation.
2.)
Zone (District) A shall have the lowest floor (including basement) elevated:
a. to at least one foot above the base flood elevation utilizing information
obtained pursuant to Section 3.H.1.B.i.; Section 5.B; or Section 8.D.; or,
b. in the absence of all data described in Article VI.H.2.a., to at least two feet
above the highest adjacent grade to the structure
I.
Non Residential - New construction or substantial improvement of any non-residential
structure located within:
1.)
Zone (District) AE shall have the lowest floor (including basement) elevated to
at least one foot above the base flood elevation, or together with attendant
utility and sanitary facilities shall:
a.
be floodproofed to at least one foot above the base flood elevation so
that below that elevation the structure is watertight with walls
substantially impermeable to the passage of water;
b.
have structural components capable of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy; and,
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 9
c.
be certified by a registered professional engineer or architect that the
floodproofing design and methods of construction are in accordance
with accepted standards of practice for meeting the provisions of this
section. Such certification shall be provided with the application for a
Flood Hazard Development Permit, as required by Section 3.K. and
shall include a record of the elevation above mean sea level to which
the structure is floodproofed.
2.)
Zone (District) A shall have the lowest floor (including basement) elevated:
a.
to at least one foot above the base flood elevation utilizing information
obtained pursuant to Section 3.H.1.b.(i.); Section 5.B; or Section
8.D.;or,
b.
in the absence of all data described in Section 6.I.2.a., to at least two feet
above the highest adjacent grade to the structure; or,
c.
together with attendant utility and sanitary facilities meet the
Floodproofing standards of Section 6.I.1.a.,b., and c.
J.
Manufactured Homes - New or substantially improved manufactured homes located
within:
1.)
Zone (District) AE shall:
a.
be elevated such that the lowest floor (including basement) of the
manufactured home is at least one foot above the base flood elevation;
b.
be on a permanent foundation, which may be poured masonry slab or
foundation walls, with hydraulic openings, or may be reinforced piers or
block supports, any of which support the manufactured home so that no
weight is supported by its wheels and axles; and,
c.
be securely anchored to an adequately anchored foundation system to
resist flotation, collapse, or lateral movement. Methods of anchoring
may include, but are not limited to:
i.
over-the-top ties anchored to the ground at the four corners of the
manufactured home, plus two additional ties per side at
intermediate points (manufactured homes less than 50 feet long
require one additional tie per side); or by,
ii.
frame ties at each corner of the home, plus five additional ties
along each side at intermediate points (manufactured homes less
than 50 feet long require four additional ties per side).
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 10
iii.
all components of the anchoring system described in Section
6.J.1.c.(i)&(ii) shall be capable of carrying a force of 4800
pounds.
2.)
Zone (District) A shall:
a.
be elevated on a permanent foundation, as described in Section 6.J.1.b.,
such that the lowest floor (including basement) of the manufactured home
is at least one foot above the base flood elevation utilizing information
obtained pursuant to Section 3.H.1.b.i.; Section 5.B; or Section 8.D.; or,
b.
in the absence of all data as described in Article VI.J.2.a., to at least two
feet above the highest adjacent grade to the structure; and,
c.
meet the anchoring requirements of Section 6.J.1.c.
K.
Recreational Vehicles - Recreational Vehicles located within:
1.)
Zones (Districts) A and AE shall either:
a.
be on the site for fewer than 180 consecutive days,
b.
be fully licensed and ready for highway use. A recreational vehicle is ready
for highway use if it is on its wheels or jacking system, is attached to the
site only by quick disconnect type utilities and security devices, and has no
permanently attached additions; or,
c.
be permitted in accordance with the elevation and anchoring requirements
for "manufactured homes" in Section 6.J.1.
L.
Accessory Structures - New construction or substantial improvement of Accessory
Structures, as defined in Article 13, shall be exempt from the elevation criteria required
in Section 6.H & I. above, if all other requirements of Section 6 and all the following
requirements are met.
1.)
Accessory Structures located in Zones (Districts) A and AE shall:
a.
meet the requirements of Article VI.A.1. through 4., as applicable;
b.
be limited in size to a one-story two car garage;
c.
have unfinished interiors and not be used for human habitation;
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 11
d.
have only ground fault interrupt electrical outlets. The electric
service disconnect shall be located above the base flood elevation and
when possible outside the Special Flood Hazard Area;
e.
be located outside the floodway;
f.
when possible be constructed and placed on the building site so as to
offer the minimum resistance to the flow of floodwaters and be placed
farther from the source of flooding than is the primary structure; and,
g.
have hydraulic openings, as specified in Section 6.N.2., in at least two
different walls of the accessory structure.
M.
Floodways -
1.)
In Zone (District) AE riverine areas, encroachments, including fill, new
construction, substantial improvement, and other development shall not be
permitted within a regulatory floodway which is designated on the community's
Flood Insurance Rate Map, unless a technical evaluation certified by a registered
professional engineer is provided demonstrating that such encroachments will
not result in any increase in flood levels within the community during the
occurrence of the base flood discharge.
2.)
In Zones (Districts) AE and A riverine areas for which no regulatory floodway
is designated, encroachments, including fill, new construction, substantial
improvement, and other development shall not be permitted in the floodway as
determined in Section 6.M.3. unless a technical evaluation certified by a
registered professional engineer is provided demonstrating that the cumulative
effect of the proposed development, when combined with all other existing
development and anticipated development:
a.
will not increase the water surface elevation of the base flood more than
one foot at any point within the community; and,
b.
is consistent with the technical criteria contained in FEMA's guidelines
and standards for flood risk analysis and mapping.
3.)
In Zones (Districts) A and AE riverine areas, for which no regulatory floodway
is designated, the regulatory floodway is determined to be the channel of the river
or other water course and the adjacent land areas to a distance of one-half the
width of the floodplain as measured from the normal high water mark to the
upland limit of the floodplain.
N.
Hydraulic Openings/Flood Vents - New construction or substantial improvement of
any structure in Zones (Districts) A and AE that meets the development standards of
Section 6, including the elevation requirements of Section 6, paragraphs H, I, or J, and
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 12
is elevated on posts, columns, piers, piles, or crawlspaces may be enclosed below the
base flood elevation requirements provided all the following criteria are met or exceeded:
1.)
Enclosed areas are not "basements" as defined in Section 13;
2.)
Enclosed areas shall be designed to automatically equalize hydrostatic flood
forces on exterior walls by allowing for the entry and exit of flood water. Designs
for meeting this requirement must either:
a.
be engineered and certified by a registered professional engineer or
architect; or,
b.
meet or exceed the following minimum criteria:
i.
a minimum of two openings having a total net area of not less
than one square inch for every square foot of the enclosed area;
ii.
the bottom of all openings shall be below the base flood elevation
and no higher than one foot above the lowest grade; and,
iii.
openings may be equipped with screens, louvers, valves, or other
coverings or devices provided that they permit the entry and exit
of flood waters automatically without any external influence or
control such as human intervention, including the use of
electrical and other non-automatic mechanical means;
3.)
The enclosed area shall not be used for human habitation; and,
4.)
The enclosed areas are usable solely for building access, parking of vehicles, or
storage.
O.
Bridges - New construction or substantial improvement of any bridge in Zones
(Districts) A and AE shall be designed such that:
1.)
when possible, the lowest horizontal member (excluding the pilings, or columns)
is elevated to at least one foot above the base flood elevation; and
2.)
a registered professional engineer shall certify that:
a.
the structural design and methods of construction shall meet the elevation
requirements of this section and the floodway standards of Section 6. M.;
and
b.
the foundation and superstructure attached thereto are designed to resist
flotation, collapse and lateral movement due to the effects of wind and
water loads acting simultaneously on all structural components. Water
loading values used shall be those associated with the base flood.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 13
P.
Containment Walls - New construction or substantial improvement of any containment
wall located within
1.
Zones (Districts) A and AE shall:
a.
have the containment wall elevated to at least one foot above the base
flood elevation;
b.
have structural components capable of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy; and,
c.
be certified by a registered professional engineer or architect that the
design and methods of construction are in accordance with accepted
standards of practice for meeting the provisions of this section. Such
certification shall be provided with the application for a Flood Hazard
Development Permit, as required by Section 3.K.
Q.
Wharves, Piers and Docks - New construction or substantial improvement of wharves,
piers, and docks are permitted in Zones (Districts) A, and AE, in and over water and shall
comply with all applicable local, state, and federal regulations.
7.
CERTIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which is
constructed or substantially improved shall be occupied until a Certificate of Compliance is
issued by the Code Enforcement Officer subject to the following provisions:
A.
For New Construction or Substantial Improvement of any elevated structure the applicant
shall submit to the Code Enforcement Officer, an Elevation Certificate completed by a
Professional Land Surveyor, registered professional engineer, or architect, for
compliance with Section 6, paragraphs H., I., or J..
B.
The applicant shall submit written notification to the Code Enforcement Officer that the
development is complete and complies with the provisions of this Ordinance.
C.
Within 10 working days, the Code Enforcement Officer shall:
1.)
review the Elevation Certificate and the applicant's written notification; and,
2.)
upon determination that the development conforms with the provisions of this
Ordinance, shall issue a Certificate of Compliance.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 14
8.
REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed developments that
require review under other federal law, state law or local ordinances or regulations and all
projects on 5 or more disturbed acres, or in the case of manufactured home parks divided into
two or more lots, assure that:
A.
All such proposals are consistent with the need to minimize flood damage.
B.
All public utilities and facilities, such as sewer, gas, electrical and water systems are
located and constructed to minimize or eliminate flood damages.
C.
Adequate drainage is provided so as to reduce exposure to flood hazards.
D.
All proposals include base flood elevations, flood boundaries, and, in a riverine
floodplain, floodway data. These determinations shall be based on engineering practices
recognized by the Federal Emergency Management Agency.
E.
Any proposed development plan must include a condition of plan approval requiring that
structures on any lot in the development having any portion of its land within a Special
Flood Hazard Area, are to be constructed in accordance with Section 6 of this Article.
Such requirement will be included in any deed, lease, purchase and sale agreement, or
document transferring or expressing an intent to transfer any interest in real estate or
structure, including but not limited to a time-share interest. The condition shall clearly
articulate that the municipality may enforce any violation of the construction requirement
and that fact shall also be included in the deed or any other document previously
described. The construction requirement shall also be clearly stated on any map, plat, or
plan to be signed by the Planning Board or local reviewing authority as part of the
approval process.
9. APPEALS AND VARIANCES
The Board of Appeals of the Town of Orrington may, upon written application of an aggrieved party,
hear and decide appeals where it is alleged that there is an error in any order, requirement, decision, or
determination made by, or failure to act by, the Code Enforcement Officer or Planning Board in the
administration or enforcement of the provisions of this Ordinance.
The Board of Appeals may grant a variance from the requirements of this Ordinance consistent with
state law and the following criteria:
A. Variances shall not be granted within any designated regulatory floodway if any increase in flood
levels during the base flood discharge would result.
B. Variances shall be granted only upon:
1.) a showing of good and sufficient cause; and,
2.) a determination that should a flood comparable to the base flood occur, the granting of a
variance will not result in increased flood heights, additional threats to public safety, public
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 15
expense, or create nuisances, cause fraud or victimization of the public, or conflict with
existing local laws or ordinances; and,
3.) a showing that the issuance of the variance will not conflict with other state, federal, or local
laws or ordinances; and,
4.) a determination that failure to grant the variance would result in "undue hardship," which in
this sub-section means:
a.
that the land in question cannot yield a reasonable return unless a variance is granted;
and,
b. that the need for a variance is due to the unique circumstances of the property and not to
the general conditions in the neighborhood; and,
c.
that the granting of a variance will not alter the essential character of the locality; and,
d. that the hardship is not the result of action taken by the applicant or a prior owner.
C. Variances shall only be issued upon a determination that the variance is the minimum necessary,
considering the flood hazard, to afford relief, and the Board of Appeals may impose such
conditions to a variance as it deems necessary.
D. Variances may be issued for new construction, substantial improvements, or other development
for the conduct of a functionally dependent use provided that:
1.) the criteria of Section 9.A. through C. and Section 6.M. are met; and,
2.) the structure or other development is protected by methods that minimize flood damages
during the base flood and create no additional threats to public safety.
E. Variances may be issued for the repair, reconstruction, rehabilitation, or restoration of Historic
Structures upon the determination that:
1.) the development meets the criteria of Section. 9.A. through C.; and,
2.) the proposed repair, reconstruction, rehabilitation, or restoration will not preclude the
structure's continued designation as a Historic Structure and the variance is the minimum
necessary to preserve the historic character and design of the structure.
F.
Variances may be issued for new construction and substantial improvement of Agricultural
Structures being used for the conduct of agricultural uses provided that:
1.) the development meets the criteria of Section 9.A. through C.; and,
2.) the development meets the criteria of Section 6.M. and Section 6.N.
G. Any applicant who meets the criteria of Section 9.A. through C. and section 9.D., E., or F. shall be
notified by the Board of Appeals in writing over the signature of the Chairman of the Board of
Appeals that:
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 16
1.) the issuance of a variance to construct a structure below the base flood level will result in
greatly increased premium rates for flood insurance up to amounts as high as $25 per $100 of
insurance coverage; and,
2.) such construction below the base flood level increases risks to life and property; and,
3.) the applicant agrees in writing that the applicant is fully aware of all the risks inherent in the
use of land subject to flooding, assumes those risks and agrees to indemnify and defend the
municipality against any claims filed against it that are related to the applicant's decision to
use land located in a floodplain and that the applicant individually releases the municipality
from any claims the applicant may have against the municipality that are related to the use of
land located in a floodplain.
H. Appeal Procedure for Administrative and Variance Appeals
1.) An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved
party within thirty days after receipt of a written decision of the Code Enforcement Officer or
Planning Board.
2.) Upon being notified of an appeal, the Code Enforcement Officer or Planning Board, as
appropriate, shall transmit to the Board of Appeals all of the documents constituting the
record of the decision appealed from.
3.) The Board of Appeals shall hold a public hearing on the appeal within thirty-five days of its
receipt of an appeal request.
4.) The person filing the appeal shall have the burden of proof.
5.) The Board of Appeals shall decide all appeals within thirty-five days after the close of the
hearing and shall issue a written decision on all appeals.
6.) The Board of Appeals shall submit to the Code Enforcement Officer a report of all variance
actions, including justification for the granting of the variance and an authorization for the
Code Enforcement Officer to issue a Flood Hazard Development Permit, which includes any
conditions to be attached to said permit.
7.) Any aggrieved party who participated as a party during the proceedings before the Board of
Appeals may take an appeal to Superior Court in accordance with State laws within forty-five
days from the date of any decision of the Board of Appeals.
10. ENFORCEMENT AND PENALTIES
A. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance
pursuant to Title 30-A MRSA § 4452.
B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of this
Ordinance.
C. In addition to any other actions, the Code Enforcement Officer, upon determination that a
violation exists, may submit a declaration to the Administrator of the Federal Insurance
Administration requesting a denial of flood insurance. The valid declaration shall consist of:
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 17
1.) the name of the property owner and address or legal description of the property sufficient to
confirm its identity or location;
2.) a clear and unequivocal declaration that the property is in violation of a cited State or local
law, regulation, or ordinance;
3.) a clear statement that the public body making the declaration has authority to do so and a
citation to that authority;
4.) evidence that the property owner has been provided notice of the violation and the prospective
denial of insurance; and,
5.) a clear statement that the declaration is being submitted pursuant to Section 1316 of the
National Flood Insurance Act of 1968, as amended.
11. VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such decision shall
not invalidate any other section or provision of this Ordinance.
12. CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with any other
applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this Ordinance
imposes a greater restriction upon the use of land, buildings, or structures, the provisions of this
Ordinance shall control.
13. DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have the same
meaning as they have at common law and to give this Ordinance its most reasonable application.
Words used in the present tense include the future, the singular number includes the plural, and the
plural number includes the singular. The word "may" is permissive; "shall" is mandatory and not
discretionary.
Accessory Structure - a structure which is on the same parcel of property as a principal structure and
the use of which is incidental to the use of the principal structure.
Adjacent Grade - the natural elevation of the ground surface prior to construction next to the
proposed walls of a structure.
Agricultural Structure - structures that are used exclusively for agricultural purposes or uses in
connection with the production, harvesting, storage, raising, or drying of agricultural commodities and
livestock. Structures that house tools or equipment used in connection with these purposes or uses are
also considered to have agricultural purposes or uses.
Area of Special Flood Hazard - the land in the floodplain having a one percent or greater chance of
flooding in any given year, as specifically identified in the Flood Insurance Study cited in Article 7,
Section 1 of this Ordinance.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 18
Base Flood - a flood having a one percent chance of being equaled or exceeded in any given year,
commonly called the 100-year flood.
Basement - any area of the building having its floor subgrade (below ground level) on all sides.
Building - see Structure.
Certificate of Compliance - A document signed by the Code Enforcement Officer stating that a
structure is in compliance with all of the provisions of this Ordinance.
Code Enforcement Officer (CEO) - A person certified under Title 30-A MRSA, Section 4451
(including exceptions in subsection 4451, paragraph 1) and employed by a municipality to enforce all
applicable comprehensive planning and land use laws and ordinances.
Containment Wall - a wall surrounding all sides of an above ground tank to contain any spills or
leaks.
Development - any man made change to improved or unimproved real estate. This includes, but is not
limited to, buildings or other structures; mining, dredging, filling, grading, paving, excavation, drilling
operations or storage of equipment or materials; and the storage, deposition, or extraction of materials.
Digital Flood Insurance Rate Map (DFIRM) - an official digital map of a community, on which the
Federal Insurance Administrator has delineated both the special hazard areas and the risk premium
zones (districts) applicable to the community.
Elevated Building - a non-basement building that is:
1.) built, in the case of a building in Zones (Districts) AE or A, to have the top of the elevated floor
elevated above the ground level by means of pilings, columns, posts, piers, or shear walls; and,
2.) adequately anchored so as not to impair the structural integrity of the building during a flood of up
to one foot above the magnitude of the base flood.
In the case of Zones (Districts) AE or A, Elevated Building also includes a building elevated by means
of fill or solid foundation perimeter walls with hydraulic openings sufficient to facilitate the
unimpeded movement of flood waters, as required in Section 6.N.
Elevation Certificate - an official form (FEMA Form 81-31, as amended) that:
1.) is used to verify compliance with the floodplain management regulations of the National Flood
Insurance Program; and,
2.) is required for purchasing flood insurance.
Existing Manufactured Home Park or Subdivision - a manufactured home park or subdivision that
was recorded in the deed registry prior to the adoption date of the community's first floodplain
management regulations.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 19
Flood or Flooding -
1.) A general and temporary condition of partial or complete inundation of normally dry land areas
from:
a.
The overflow of inland or tidal waters.
b. The unusual and rapid accumulation or runoff of surface waters from any source.
2.) The collapse or subsidence of land along the shore of a lake or other body of water as a result of
erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels
or suddenly caused by an unusually high water level in a natural body of water, accompanied by a
severe storm, or by an unanticipated force of nature, such as flash flood or an abnormal tidal surge,
or by some similarly unusual and unforeseeable event which results in flooding as defined in
paragraph 1. a. of this definition.
Flood Elevation Study - an examination, evaluation and determination of flood hazards and, if
appropriate, corresponding water surface elevations.
Flood Insurance Rate Map (FIRM) - an official map of a community, on which the Federal
Insurance Administrator has delineated both the special hazard areas and the risk premium zones
(districts) applicable to the community.
Flood Insurance Study - see Flood Elevation Study.
Floodplain or Flood-prone Area - any land area susceptible to being inundated by water from any
source (see Flood or Flooding).
Floodplain Management - the operation of an overall program of corrective and preventive measures
for reducing flood damage, including but not limited to emergency preparedness plans, flood control
works, and floodplain management regulations.
Floodplain Management Regulations - Land Use ordinances, subdivision regulations, building
codes, health regulations, special purpose ordinances (such as a floodplain ordinance, grading
ordinance, and erosion control ordinance), and other applications of police power. The term describes
such state or local regulations, in any combination thereof, which provide standards for the purpose of
flood damage prevention and reduction.
Floodproofing - any combination of structural and non-structural additions, changes, or adjustments to
structures which reduce or eliminate flood damage to real estate or improved real property, water and
sanitary facilities, structures, and contents.
Floodway - see Regulatory Floodway.
Floodway Encroachment Lines - the lines marking the limits of floodways on federal, state, and local
floodplain maps.
Freeboard - a factor of safety usually expressed in feet above a flood level for purposes of floodplain
management. Freeboard tends to compensate for the many unknown factors, such as wave action,
bridge openings, and the hydrological effect of urbanization of the watershed that could contribute to
flood heights greater than the height calculated for a selected size flood and floodway conditions.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 20
Functionally Dependent Use - a use which cannot perform its intended purpose unless it is located or
carried out in close proximity to water. The term includes only docking facilities, port facilities that
are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair
facilities, but does not include long-term storage or related manufacturing facilities.
Historic Structure - any structure that is:
1.) Listed individually in the National Register of Historic Places (a listing maintained by the
Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the
requirements for individual listing on the National Register;
2.) Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic zone (district) or a zone (district) preliminarily
determined by the Secretary of the Interior to qualify as a registered historic zone (district);
3.) Individually listed on a state inventory of historic places in states with historic preservation
programs which have been approved by the Secretary of the Interior; or,
4.) Individually listed on a local inventory of historic places in communities with historic preservation
programs that have been certified either:
a.
By an approved state program as determined by the Secretary of the Interior, or,
b. Directly by the Secretary of the Interior in states without approved programs.
Locally Established Datum - for purposes of this ordinance, an elevation established for a specific
site to which all other elevations at the site are referenced. This elevation is generally not referenced to
the National Geodetic Vertical Datum (NGVD), North American Vertical Datum (NAVD), or any
other established datum and is used in areas where Mean Sea Level data is too far from a specific site
to be practically used.
Lowest Floor - the lowest floor of the lowest enclosed area (including basement). An unfinished or
flood resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area
other than a basement area is not considered a building's lowest floor, provided that such enclosure is
not built so as to render the structure in violation of the applicable non-elevation design requirements
described in Section 6.N. of this ordinance.
Manufactured Home - a structure, transportable in one or more sections, which is built on a
permanent chassis and is designed for use with or without a permanent foundation when connected to
the required utilities. For floodplain management purposes the term manufactured home also includes
park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive
days.
Manufactured Home Park or Subdivision - a parcel (or contiguous parcels) of land divided into two
or more manufactured home lots for rent or sale.
Mean Sea Level - for purposes of the National Flood Insurance Program, the National Geodetic
Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD), or other datum to which
base flood elevations shown on a community's Flood Insurance Rate Map are referenced.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 21
Minor Development - all development that is not new construction or a substantial improvement, such
as repairs, maintenance, renovations, or additions, whose value is less than 50% of the market value of
the structure. It also includes but is not limited to: accessory structures as provided for in Article 6.L.,
mining, dredging, filling, grading, paving, excavation, drilling operations, storage of equipment or
materials, deposition or extraction of materials, public or private sewage disposal systems or water
supply facilities that do not involve structures; and non-structural projects such as bridges, dams,
towers, fencing, pipelines, wharves, and piers.
National Geodetic Vertical Datum (NGVD) - the national vertical datum, whose standard was
established in 1929, which is used by the National Flood Insurance Program (NFIP). NGVD was
based upon mean sea level in 1929 and also has been called "1929 Mean Sea Level (MSL)".
New Construction - structures for which the "start of construction" commenced on or after the
effective date of the initial floodplain management regulations adopted by a community and includes
any subsequent improvements to such structures.
North American Vertical Datum (NAVD) - the national datum whose standard was established in
1988, which is the new vertical datum used by the National Flood Insurance Program (NFIP) for all
new Flood Insurance Rate Maps. NAVD is based upon the vertical datum used by other North
American countries such as Canada and Mexico and was established to replace NGVD because of
constant movement of the earth's crust, glacial rebound and subsidence, and the increasing use of
satellite technology.
One-hundred-year flood (100-year flood) - see Base Flood.
Recreational Vehicle - a vehicle which is:
1.) built on a single chassis;
2.) 400 square feet or less when measured at the largest horizontal projection, not including slideouts;
3.) designed to be self-propelled or permanently towable by a motor vehicle; and,
4.) designed primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
Regulatory Floodway -
1.) the channel of a river or other water course and the adjacent land areas that must be reserved in
order to discharge the base flood without cumulatively increasing the water surface elevation
more than a designated height, and,
2.) when not designated on the community's Flood Insurance Rate Map, it is considered to be the
channel of a river or other water course and the adjacent land areas to a distance of one-half the
width of the floodplain, as measured from the normal high water mark to the upland limit of the
floodplain.
Riverine - relating to, formed by, or resembling a river (including tributaries), stream, brook, etc.
Special Flood Hazard Area - see Area of Special Flood Hazard.
June 6, 2005, June 6, 2022, June 5, 2023
Floodplain Management
7 - 22
Start of Construction - the date the building permit was issued, provided the actual start of
construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement or
other improvement was within 180 days of the permit date. The actual start means either the first
placement of permanent construction of a structure on a site, such as the pouring of slab or footings,
the installation of piles, the construction of columns, or any work beyond the stage of excavation; or
the placement of a manufactured home on a foundation. Permanent construction does not include land
preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or
walkways; nor does it include excavation for basement, footings, piers, or foundations or the erection
of temporary forms; nor does it include the installation on the property of accessory buildings, such as
garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial
improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or
other structural part of a building, or modification of any construction element, whether or not that
alteration affects the external dimensions of the building.
Structure - for floodplain management purposes, a walled and roofed building. A gas or liquid
storage tank that is principally above ground is also a structure.
Substantial Damage - damage of any origin sustained by a structure whereby the cost of restoring the
structure to its before damage condition would equal or exceed 50 percent of the market value of the
structure before the damage occurred.
Substantial Improvement - any reconstruction, rehabilitation, addition, or other improvement of a
structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the
start of construction of the improvement. This term includes structures which have incurred
substantial damage, regardless of the actual repair work performed. The term does not, however,
include either:
1.) Any project for improvement of a structure to correct existing violations of state or local health,
sanitary, or safety code specifications which have been identified by the local code enforcement
official and which are the minimum necessary to assure safe living conditions; or,
2.) Any alteration of a Historic Structure, provided that the alteration will not preclude the structure's
continued designation as a historic structure, and a variance is obtained from the community's
Board of Appeals.
Variance - a grant of relief by a community from the terms of a floodplain management regulation.
Violation - the failure of a structure or development to comply with a community's floodplain
management regulations.
14. - ABROGATION
This ordinance repeals and replaces any municipal ordinance previously enacted to comply with the
National Flood Insurance Act of 1968 (P.L. 90-488, as amended).
15. - DISCLAIMER OF LIABILITY
The degree of flood protection required by the ordinance is considered reasonable but does not imply
total flood protection.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-1
ARTICLE 6 -- SITE PLAN AND SUBDIVISION REVIEW
1.
PURPOSE
The purpose of this Article is to assure the comfort, convenience, safety, health and welfare of
the people of the Town of Orrington, to protect the environment and to promote the development
of an economically sound and stable community. In reviewing site plans and approving
subdivisions, the Planning Board shall consider the requirements of this Article before granting
approval, approval with conditions, or denial, shall make findings of fact that the provisions of
this Article have been met and that proposed subdivisions meet the guidelines of the state law,
Title 30-A, M.R.S.A. Sections 4401-4407 as amended.
2.
APPLICABILITY PROVISIONS
A.
Activities requiring site plan or subdivision review.
The following land use activities in the Town of Orrington must receive site plan approval
and/or subdivision approval pursuant to the provisions of this article:
1.)
Table of land uses. All land use activities set forth in Article 2, Section 5, as
requiring site plan approval from the Planning Board.
2.)
Subdivisions. All subdivisions as defined by Title 30-A M.R.S.A. Section 4401
including the division of any existing building or the construction of any new
structures or buildings containing three (3) or more units.
3.)
Expansion of existing nonresidential buildings or structures. The expansion
of an existing nonresidential building or structure, including accessory buildings,
if the enlargement increases the total area for all floors within a five (5) year
period by more than twenty (20) percent of the existing floor area or five-hundred
(500) square feet, whichever is greater.
4.)
Construction of new multifamily housing or the enlargement of existing
multifamily housing:
a.
The construction of a residential building containing three (3) or more
dwelling units.
b.
The modification or expansion of an existing residential structure that
increases the number of dwelling units in the structure by three (3) or more
in any five (5) year period.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-2
5.)
Changes in use of existing buildings or structures
a.
The conversion of an existing building from residential to nonresidential
use.
b.
The conversion of an existing nonresidential use to another nonresidential
use. The conversion of an existing nonresidential use to another
nonresidential use when the new use changes the basic nature of the
existing use such that it increases the intensity of on- or off-site impacts
shall subject the change in use to the standards and criteria of site plan
review.
c.
The conversion of an existing nonresidential building or structure in whole
or in part, into three (3) or more dwelling units within a specified period
(i.e. five (5) years).
6.)
Expansion of the amount of impervious or paved surfaces. The construction
or expansion of paved areas or other impervious surfaces, including walkways,
access drives, and parking lots involving an area of more than 1,500 square feet
within a five (5) year period.
7.)
Commercial uses of land that do not involve buildings or structures. The
establishment of a new nonresidential use even if no buildings or structures are
proposed, including uses such as cemeteries, golf courses, groundwater
extraction, and other nonstructural nonresidential uses.
B.
Activities not requiring site plan review.
The following activities do not require approval from the Planning Board under the
provisions of this article. Certain of these activities will, however, require the owner to
obtain a building permit, plumbing permit or other state or local approvals:
1.)
All land use activities set forth in Article 2, Section 5 as not requiring site plan
approval from the Planning Board.
C.
Prohibition.
No permit, plumbing permit or certificate of occupancy shall be issued by the Code
Enforcement Officer for any use or development within the scope of Article 6 until a site
plan development application, or subdivision application has been reviewed and approved
by the Planning Board, unless otherwise exempted or allowed.
D.
Waivers.
Waiver. In cases where development or expansion will not significantly change the
nature or intensity of the use or the exterior dimensions of any existing structure, or where
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-3
a proposed use is deemed by the Planning Board to have no discernable impact on
adjoining property or the environment or public infrastructure, the Planning Board may
waive the review procedure and all or portions of the submission requirements in order
that the project may be expedited if the information is not required to determine
compliance with the standards of this Ordinance.
3.
SITE PLAN AND SUBDIVISION SUBMISSION REQUIREMENTS
Applications for subdivision or site plan review shall be submitted an application forms provided
by the Town. The complete application form, evidence of payment of the required fees, and the
required plans and related information shall be submitted to the Code Enforcement Officer no
later than the first business day of the month prior to the meeting at which the item is to be heard.
The Code Enforcement Officer shall forward the application package to the Planning Board ten
(10) days prior to the meeting. The submission shall contain the following information and
exhibits unless specifically waived by the Planning Board.
A.
Application submittal. The applicant shall submit eight (8) copies of a fully completed
and signed copy of the application form to the Code Enforcement Officer.
B.
Evidence of fee payment. The applicant shall present evidence of payment of the
application and applicable technical review fees authorized by Section 5.
C.
Plan submittals and map scale. The applicant shall submit three sets of all plans no
larger than 24 inches by 36 inches drawn to a scale not smaller than one inch per forty
(40) feet (1:480) for sites less than or equal to ten (10) acres, or not smaller than one inch
per one hundred (100) feet (1:1200) for sites greater than ten (10) acres but less than or
equal to one hundred (100) acres, but no map or drawing shall be drawn at a scale larger
than one inch per ten (10) feet (1:120), and eight (8) copies of all site plans, maps and
drawings no larger than 11inches x 17 inches. No font size shall be smaller than 8 point.
If the complete plat cannot be shown on one sheet, it may be shown on more than one
sheet with an index map on a separate sheet of the same size. The Planning Board may,
if project uniqueness warrants, permit plans for sites containing more than one hundred
(100) acres to be drawn at a smaller scale, provided all necessary detail can easily be read
or identified, unaided. Plans shall have a margin of two inches outside of the border lines
on the left side for binding and a one inch margin outside the border along the remaining
sides. All plans shall include the site plan or subdivision name, the date, magnetic north
arrow, graphic scale, Planning Board approval block, and the name, registration number
and seal of the person who prepared the plan(s), if applicable.
All final plans that require a boundary survey shall be submitted in both printed and
digital forms. The digital files shall contain all of the lot lines as geometrically closed
polygons and be geographically referenced with at least sub-meter GPS control. The
digital files shall have no fewer than four non-linear (well dispersed across the project
area) projected control points of at least sub-meter accuracy and shall be submitted as
follows:
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-4
1. Projection: Universal Transverse Mercator (UTM), Zone19; or U. S. State
Plane coordinate System Maine East 1983 Feet,
2. Datum: North American Datum (NAD83)
3. File Format: ESRI shape files, or MapInfo Tab files, or Global Mapper gmp
files.
1.)
General map. A general map shall be included on the site plan which shows the
general location of the site within the municipality.
2.)
Location map. The applicant shall include a location map with a Graphic Scale
Bar on the site plan or separate sheet, drawn at a scale that shows all features
within 300 feet of the project boundary. The location map shall include the tax
map and lot number of the parcel or parcels on which the project is located. No
font shall be smaller than 8 point. All necessary detail shall be easily read or
identified, unaided.
3.)
Boundary survey. Identify the bearings and length of all property lines of the
property to be developed and the source of the information including surveyor
identification and the location of all required building setbacks, yards, and buffers
and the boundaries of all contiguous property under the total or partial control of
the owner or applicant regardless of whether all or part is being developed at this
time. The Planning Board may waive this requirement of a boundary survey when
sufficient information is available to establish, on the ground, all property
boundaries within three-hundred (300) feet of the proposed development.
D.
Existing site conditions plan(s). The existing site conditions plan(s) shall show the
following information and existing conditions and any limitations for its use and
development.
1.)
Title block. The record owner's name, address, project title and location of the
subdivision or site plan and the applicant's name and address if different.
2.)
Land use district classification(s). Identify on the site plan the land use
district(s) classification for the project.
3.)
Existing contour lines. Contour lines at intervals of not more than five (5) feet
unless otherwise prescribed by the Planning Board.
4.)
Buildings. The location, dimensions, size, ground floor elevation and setbacks
of existing buildings. Dimensions shall be shown in units of feet and inches, or
foot measurement to a maximum of 3 decimal places, or meters to a maximum of
4 decimal places, and chosen measurement style/units shall be consistent
throughout the plan.
5).
Streets and driveways. The location, names and widths of existing streets,
driveways, parking and loading areas, walkways and rights-of-way within or
adjacent to the proposed development.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-5
6.)
Utilities. The location, dimensions and size of all existing utility locations for
sewer and water mains, wells, on-site subsurface wastewater disposal systems,
underground tanks or installations, gas, power and telephone lines and poles,
outside lighting or other utilities including size and elevation of buried or
underground utilities on the property to be developed, and on abutting streets, or
land that may serve the development and an assessment of their adequacy and
condition to meet the needs of the proposed use. Appropriate elevations must be
provided as necessary to determine the direction of flow.
7.)
Significant features. The location of drainage courses, culverts, catch basins,
wetlands, stone walls, graveyards, fences, stands of trees, and other significant
natural areas, wildlife habitats, scenic areas, habitat for rare and endangered plants
and animals, unique natural communities and natural areas, sand and gravel
aquifers, and historic and/or archaeological resources, together with a description
of such features.
8.)
Wetland delineation. A full delineation of all wetland boundaries by a
professional wetlands delineator.
9.)
Drainage. The direction of existing surface water drainage across the site.
10.)
Signs. The location, front view, dimensions, and lighting of existing signs.
11.)
Easements. The location and dimension of any existing easements and copies of
existing covenants or deed restrictions.
12.)
Fire protection. The location of the nearest fire hydrant, dry hydrant or other
water supply for fire protection.
13.)
Name of consultant. The name, registration number, and seal of the person who
prepared the plan, if applicable.
E.
Proposed site plan(s) or subdivision. The proposed site plan or subdivision and
supporting materials must provide a picture of what changes will be made on the site and
how they will be carried out. In addition to the existing site plan(s), the applicant shall
provide typical site development plan(s) including the following information. The
information about the development proposal should be of a preliminary nature, not
detailed construction drawings.
1.)
Title block. Proposed subdivision or site plan name or identifying title.
2.)
Lots, lot lines and temporary markers. Number of lots, proposed lot lines and
location of temporary markers adequately located to enable the Planning Board to
locate lots readily and appraise basic lot layouts in the field.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-6
3.)
Contour lines. All proposed contours and proposed finished grade elevations of
the entire site and the system of drainage proposed to be constructed. Contour
lines shall be at two (2) foot intervals unless otherwise prescribed by the Planning
Board.
4.)
Road, driveways & parking plan. The location, names, sight distances,
dimensions and design details of all existing and proposed driveways, roads,
easements, parking and loading areas, and walkways. All proposed improvements
shall fully comply with applicable design standards and requirements.
5.)
Rights-of ways and easements. All proposed rights-of-way, easements and other
legal restrictions which may affect the premises in question.
6.)
Proposed building location. The location, dimensions, including heights and
ground floor elevations, setback dimensions, and buffers of all proposed buildings
or building expansions on the site and proposed use thereof shall be provided.
Dimensions shall be shown in units of feet and inches or foot measurement to a
maximum of 3 decimal places, or meters to a maximum of 4 decimal places, and
chosen unit of measurement shall be consistent throughout the plan.
7.)
Signs. The proposed location, front view, dimensions, materials and size of all
proposed signs, together with the material for securing the signs, and all
permanent outdoor fixtures.
8.)
Soil erosion and sedimentation control plan. An erosion and sedimentation
control plan.
9.)
Storm water management plan. A storm water management plan shall be
prepared by a registered professional engineer which plan shall include flood
flows and elevations from 25, 50 and 100 year flood flows.
10.)
Public use. Location of all parcels to be dedicated to public use such as parks or
green space, the condition of such dedication, and the location of all natural
features or site elements to be preserved.
11.)
Utility plan. A utility plan showing the design details and provision for water
supply, wastewater disposal, the location and nature of electrical, telephone, cable
TV, and any other utility services to be installed on the site.
12.)
Landscaping plan. A proposed plan for landscaping, buffering and screening
should be provided. The applicant shall provide a planting schedule keyed to the
site plan indicating the general varieties and sizes of trees, shrubs, and other
vegetation to be planted on the site, as well as information pertaining to provisions
that will be made to retain and protect existing trees, shrubs, and other vegetation.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-7
13.)
Professional certification. The name, registration number and seal of the
architect, engineer, landscape architect, and/or similar professional who prepared
the plan, if applicable.
14.)
Approval block. Space shall be provided on the plan drawings for the signatures
of the Orrington Planning Board and date together with the words, "Approved:
Town of Orrington, Maine Planning Board."
F.
Written supporting information. The applicant shall submit eight (8) copies of all
written supporting information. Evidence submitted shall document that all performance
standards contained in this Ordinance and State law can be met and that all of the
subdivision or site plan review criteria will be satisfied. The written material must be
contained in a bound report and contain the following information in the following order:
1.)
Evidence of legal interest. A copy of the deed to the property, an option to
purchase the property or other documentation to demonstrate right, title, or
interest in the property.
2.)
General description of proposed use. A general description of the proposed use
or activity.
3.)
Hydrological groundwater assessment. When a hydrogeological groundwater
assessment is required, it shall be prepared and submitted in accordance with the
requirements of the performance standards.
4.)
Net residential acreage calculation. Evidence that the project will meet the net
residential acreage calculation standard.
5.)
Refuse disposal. Document provisions for handling all solid waste, including
hazardous and special wastes and the location and proposed screening of any on-
site collection or storage facilities.
6.)
Soils. Evidence that the soils will support the project.
7.)
Subsurface disposal system report. Subsurface Disposal System Report. An
on-site soils investigation report by a soil scientist certified by the State of Maine
Department of Human Services. This report shall contain the types of soil,
location of test sites and proposed location and design of the most appropriate and
suitable subsurface wastewater disposal systems of each lot in the project and be
signed by the soil scientist.
8.)
Water and sewer demand. The estimated demand for water and sewage disposal
together with the location and dimension of all provisions for water supply and
wastewater disposal, and evidence of their adequacy for the proposed use,
including soils test pit data if on-site wastewater disposal is proposed.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-8
9.)
Utility statement. A written statement from any utility providing services to the
project as to the adequacy of the water supply in terms of quantity and pressure
for both domestic and fire flows, and the capacity of the sewer system to
accommodate additional wastewater if public water or sewerage will be utilized.
10.)
Storage of material & equipment. The type, size and location of all machinery
or equipment likely to generate appreciable noise at the lot lines. The amount and
type of any raw, finished or waste materials to be stored outside of roofed
buildings, including their physical and chemical properties, if appropriate.
11.)
Traffic impact analysis. When required, a traffic impact analysis shall be
prepared.
12.)
Evidence of technical capability. Documentation that the applicant has retained
qualified contractors and consultants to supervise, construct, and inspect the
proposed development.
13.)
Evidence of financial capability. Documentation that the applicant has
adequate financial resources to construct the proposed improvements. Evidence
could include a letter from a financing institution regarding a loan, letter of credit,
or bank account or a certified accountant or annual report indicating adequate cash
flow to cover anticipated expenses. The applicant should document a semi-
detailed budget estimate for all costs associated with the capital investment
including: engineering, legal, financial and capital expenses and documentation
on financing package available to cover the project expenses.
14.)
Construction schedule. A schedule of construction, including anticipated
beginning and completion dates.
4.
REVIEW PROCEDURES
A.
Informal pre-application conference.
Prior to submitting a formal subdivision or site plan review application, the applicant or
his/her representative may request a pre-application conference with the Planning Board.
A pre-application conference is strongly advised. The pre-application conference shall
be informal and informational in nature. There shall be no fee for a pre-application
review, and such review shall not cause the plan to be a pending application or proceeding
under 1 M.R.S.A. Section 302. No decision on the substance of the plan shall be made
at the pre-application conference.
1.)
Purpose. The purpose of the pre-application conference is:
a.
To give the applicant the opportunity to explain the nature of the project
before submission of an application.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-9
b.
Allow the Planning Board to understand the nature of the proposed use
and the issues involved in the proposal.
c.
Allow the applicant to understand required submissions and the
development review process.
d.
Identify issues that need to be addressed in future submissions.
e.
Make the applicant aware of any opportunities for coordinating the
development with community policies, programs or facilities.
2.)
Site inspection. In addition, the Board shall schedule a site inspection for
subdivision proposals if there is no snow on the ground. The Planning Board may
schedule a site visit for site plan review applications if the Planning Board deems
it necessary. At this time, the Planning Board may also resolve any requests for
waivers and variations from the submission requirements.
3.)
Information required. There are no formal submission requirements for a pre-
application conference. However, the applicant should be prepared to discuss the
following with the Board:
a.
The proposed site, including its location, size and general characteristics.
b.
The nature of the proposed use and potential development.
c.
Any issues or questions about existing municipal regulations and their
applicability to the project.
d.
Any requests for waivers from the submission requirements.
B.
Review procedure.
The procedures for site plan review and subdivision review are as follows:
1.)
Step One. Submission of completed application to the Code Enforcement
Officer. The applicant shall submit a minimum of eight (8) copies of his/her
application and the required supporting information by the first business day of
the month prior to the meeting at which the item is to be heard.
2.)
Step Two. Code Enforcement Officer and Orrington Fire Chief review.
a.
Dated receipt. The Code Enforcement Officer shall issue the applicant a
dated receipt.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-10
b.
Fees submitted. The applicant shall provide the Code Enforcement
Officer with the applicable fees.
c.
Review for completeness. The Code Enforcement Officer shall initially
review the application and determine whether or not it is complete.
d.
Review by the Orrington Fire Chief. The Fire Chief shall review the
plan and may make recommendations for safety considerations.
e.
Notice of incomplete application. If the application is found to be
incomplete, the Code Enforcement Officer shall, within ten (10) work
days, notify the applicant in writing, of the information needed to complete
the application. Upon the applicant's submission of such additional
information, steps one and two shall be repeated.
f.
Application forwarded. The Code Enforcement Officer shall forward
copies of the application and supporting documents to the members of the
Planning Board ten (10) days prior to the meeting of the Planning Board
and copies may also be distributed to the road commissioner, fire chief,
police chief and ambulance director.
g.
Notice to abutters. Abutting property owners shall be notified by mail,
seven (7) days prior to the meeting, by the Town, of all pending project
applications. This notice shall indicate the time, date and place of Planning
Board consideration of the application.
h.
Review Comment(s) Submittal. Review written comments from all the
municipal officials who received notice.
3.)
Step Three. Preliminary plan review. At the meeting of the Planning Board at
which the proposed development is scheduled to be reviewed, the Planning Board
shall:
a.
Code Enforcement Officer report. Present to Board members written
copies of comments from municipal officials, and hear any report from the
Code Enforcement Officer.
b.
Applicant's response. Hear any comments of the applicant regarding the
Code Enforcement Officer's report.
c.
Request for waivers. Hear any requests from the applicant for waivers
pursuant to Article 6, Section 2.D.
d.
Determination of completeness. Determine whether or not the
application is complete.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-11
e.
Notice of incompleteness. If the application is determined to be
incomplete, the Board shall inform the Code Enforcement Officer of the
information required to make the application complete. The Code
Enforcement Officer shall, within ten (10) work days, inform the
applicant, in writing, of the additional information required by the
Planning Board. Upon the applicant's submission of such additional
material, steps one, two and three shall be repeated.
f.
Decide on public hearing. If the application is determined to be complete,
the Planning Board shall deem the application pending and shall determine
whether or not to set the matter to public hearing.
The Planning Board shall have the discretion to hold a public hearing to
maximize public input and provide the applicant with more of an
opportunity to prepare a response to any criticism of the proposal before
it.
i
Hearing date. If a public hearing is set, such hearing shall take
place within thirty (30) days of the Planning Board's determination
that the application is complete. This deadline may be extended
by mutual agreement of the Planning Board and the applicant,
either in writing or orally, on the record at a public meeting.
ii
Public hearing rules. Public hearing held for the purpose of
hearing testimony regarding proposals requiring approval under
this Ordinance, and notice thereof, shall be governed by Article 6,
Section 5.
4.)
Step Four. Planning Board deliberation and decision.
a.
Within sixty (60) days of the completed application being placed on the
Planning Board agenda if no public hearing is held, the Planning Board
shall reach a decision on a development application and shall inform the
Code Enforcement Office of its decision and the reasons therefore. This
time period may be extended by written, mutual agreement of the Planning
Board and the applicant. If a public hearing is held, a decision shall be
made within thirty (30) days of the public hearing.
b.
If no public hearing is held, the Planning Board may at its discretion act
upon the application at the same meeting at which completeness is
determined.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-12
5.)
Step Five. Code Enforcement Officer permit.
Upon notification of the decision of the Planning Board, the Code Enforcement
Officer, as instructed, shall within ten (10) working days, issue with conditions
prescribed by the Planning Board or deny a permit.
C.
One (1) year approval limitation.
Unless a specific extension of time is granted by the Planning Board, the approval of the
applicant's preliminary plan shall expire one (1) year from the date of approval.
D.
Final review
1.).
Within one (1) year. The final plat shall be submitted within one (1) year after
the date of approval of the preliminary plan.
If the proposed subdivision or site plan falls within the jurisdiction of and is
subject to review by the State of Maine Board of Environmental Protection, then
the approval of the Board of Environmental Protection shall be secured in writing
before official submission of the final plat.
2.)
Plat to be attested. The approval of a final plat shall be attested on two (2)
original drafting films and three (3) copies by the signatures of a legal majority of
the Planning Board.
3.)
Filing. Two (2) signed copies of the final plat, as approved, along with one
drafting film set shall be filed with the municipality. The applicant shall be
required to record and file the signed original drafting film of the final plat with
the Penobscot County Registry of Deeds within thirty (30) days of its approval by
the Planning Board.
4.)
The final plat shall show the following:
a.
Preliminary plan requirements. All the information required for the
preliminary plan and amendments thereto excepting that information not
deemed necessary by the Planning Board.
b.
Surveyor. Date and seal of the registered land surveyor who prepared the
final plat.
c.
Streets. Existing and proposed names and lines of all streets, lengths of
all straight lines, the deflection of angles, radii, length of curves, and
central angles of all curves, and tangent distances and bearings.
d.
Easements. Location, dimensions and purposes of all easements, areas
reserved for or dedicated to public use and areas reserved by the applicant.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-13
e.
Lot numbers. Lot numbers and letters in accordance with the prevailing
policy on existing tax maps.
f.
Permanent markers. Location and description of permanent markers to
be set prior to lot conveyance. No lots shall be sold until permanent
markers are in place.
g.
Performance guarantee. A performance guarantee to secure completion
of all public improvements required by the Planning Board.
h.
Land dedication. Written copies of any documents of land dedication,
and written evidence that the Board of Selectmen is satisfied with the legal
sufficiency of any documents conveying such land dedication.
i.
Signature lines. Five (5) lines for signatures of the Town of Orrington
Planning Board and a line for date of approval.
j.
Certification. A professional seal stating that all construction standards
of Article 6, Sections 9 and 10 have been met.
k.
Lot frontage. The plan shall show that all lots have frontage on public
roads.
5.)
Changes need approval. No changes, erasures, modifications or revisions shall
be made in any subdivision or site plan review after approval has been given by
the Planning Board, unless the revised plan is first submitted and the Planning
Board approves any modifications.
6.)
Fees. All applications for final subdivision plan approval shall be accompanied
by an application fee payable by check to the Town of Orrington, Maine.
E.
Project commencement and completion.
After final approval all projects must be commenced within one (1) year and completed
within two (2) years unless a special schedule has been approved or an extension has been
granted by the Planning Board.
F.
Other required permits.
The granting of project approval does not relieve the applicant from the need to obtain
any other permits or approvals required prior to the commencement of any activity or use.
Such other required permits or approvals may include, but are not limited to, subdivision
approval, building, plumbing and electrical permits, licenses granted pursuant to Title 38,
M.R.S.A. Subsection 1022, as amended, Maine Department of Environment Protection
and United States Army Corps of Engineers approvals, subsurface wastewater disposal
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-14
permits, sewer connection permits, Maine Department of Transportation approvals, and
the like. The fact that the applicant may have obtained or may have been granted such
permits or approvals prior to site plan review may be considered by the Planning Board
as evidence as to the plan's compliance with applicable review standards but shall not be
deemed conclusive evidence as to compliance.
5.
PUBLIC HEARING PROCEDURES
Subdivision and site plan review applications shall comply with the following notice and public
hearing procedures when required:
A.
Newspaper notice.
The Planning Board may, at its discretion, hold a public hearing regarding any
subdivision or site plan proposal. In the event that the Planning Board determines to hold
a public hearing on an application for subdivision or site plan approval, it shall hold such
hearing within thirty (30) days of receipt of a completed application, and shall cause
notice of the date, time and place of such hearing to be given to the person making the
application and to be published in a newspaper of general circulation in the Town of
Orrington, at least twice, the date of the first publication to be at least seven (7) days prior
to the hearing. Such notice shall also be posted in three public places in the community
at least seven (7) days prior to the hearing.
B.
Sequence of presentation.
1.)
Presentation by applicant and his or her attorney and witnesses, without
interruption;
2.)
Questions through the chairperson to the applicant by Planning Board members
and people who will be directly affected by the project (e.g. abutters) and requests
for more detailed information on the evidence by the applicant;
3.)
Presentation by abutters or others who will be directly affected by the project and
their attorneys and witnesses;
4.)
Questions by the applicant and Planning Board members through the chairperson
to the people directly affected and the witnesses who made the presentations;
5.)
Rebuttal statements by any of the people who testified previously;
6.)
Comments or questions by other interested people in the audience.
7.)
Once everyone has had the opportunity to be heard to the extent allowed by the
Planning Board's procedures, the chairperson should close the hearing. If more
time is needed, the Planning Board may vote to extend the hearing to a later date.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-15
C.
Denial or approval.
The Planning Board shall, within thirty (30) days of a public hearing, or within such other
time limit as may be otherwise mutually agreed to, issue an order denying or granting
approval of the proposed subdivision or site plan or granting approval upon such terms
and conditions as it may deem advisable to satisfy the performance standards and criteria
of this Ordinance and or Title 30-A, M.R.S.A. , Section 4404.
In all instances the burden of proof shall be upon the persons proposing the plans or
subdivisions. In issuing its decision, the Planning Board shall make findings of fact as
required by Title 1, M.R.S.A. Section 407.
6.
FEES
A.
Application fee.
An application for site plan review must be accompanied by an application fee made by
check payable to the Town of Orrington, Maine in accordance with the Schedule of Fees
adopted by the Board of Selectmen. This fee is intended to cover the cost of the town's
administrative processing of the application, including notification, advertising, mailings,
and similar costs. The fee shall not be refundable. The application fee shall be paid to
the town, and evidence of payment of the fee shall be included with the application.
B.
Professional review and assistance.
The Orrington Planning Board reserves the right to require an independent review by a
professional of its choice, of any proposed plans/details, specifications, surveys,
improvements, or reports submitted by any developer as part of the application. If the
Board agrees that such an analysis is necessary, or if they agree that additional
professional analysis is required to gauge the impact in the community or local
environment due to the proposed development, then the Board shall choose a
professional, obtain an estimate for the work, and notify the developer that the amount of
the estimate must be deposited with the Town of Orrington before any further
consideration is given to the application. No review will be initiated until the developer
pays the estimated amount to the Town. Following the completion of the review, the
developer will be billed for any reasonable cost incurred over the estimate or will be
refunded any remaining balance from the deposit. Refusal to pay for the professional
assistance will result in automatic denial of the application and no further action will be
taken by the Board until payment is made.
If the Road Commissioner or the Town's representative consider it necessary or advisable
that covered work be inspected or tested by others, then the developer, at the Road
Commissioner's request, will uncover, expose or otherwise make available for
observation, inspection or testing as the Road Commissioner or Town's representative
may require, that portion of the work, in question, furnishing all necessary labor, material,
tools, and equipment. If it is found that such work is defective, the developer will bear
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-16
the expenses including the expense of uncovering, exposure, observation, inspection and
testing and of satisfactory reconstruction. If however, such work is not found to be
defective, then the developer shall be fully reimbursed for all expenses directly
attributable to such uncovering, exposure, observation, inspection, testing and of
reconstruction. Furthermore, if the developer refuses to comply with the Road
Commissioner's or representative's request, then the Town reserves the right to draw
upon the funds deposited by the developer for use by the Town to perform any needed
reviews and inspection, and use this money to complete such uncovering, exposure,
observation, inspection and testing and of satisfactory reconstruction.
C.
Establishment of fees.
The Municipal Officers may, from time to time and after consultation with the Code
Enforcement Officer, establish the appropriate application and technical review fees.
7.
PERFORMANCE GUARANTEES
A.
Types of guarantees.
If any proposed development is of a size or nature requiring significant investment in
road/street, drainage or other improvements, the Board may require a performance
guarantee as a condition of approval. With the submittal of the application for Final Plan,
the developer shall provide one of the following performance guarantees, as approved by
the Planning Board, for an amount adequate (as determined by the Town's professional
representative) to cover construction cost of all required improvements:
1.)
Either a certified check payable to the Town or a savings account or certificate of
deposit naming the Town of Orrington as owner, for the establishment of an
escrow account.
2.)
A performance bond payable to the Town issued by a surety company.
3.)
An irrevocable letter of credit from a financial institution establishing funding for
the construction of the development, from which the Town may draw if
construction is deemed inadequate or incomplete.
B.
Contents of guarantee.
The performance guarantee shall contain a construction schedule, cost estimates for each
major phase of infrastructure construction reviewed and approved by the Town's engineer
taking into account inflation, provisions for inspections of each phase of construction,
provisions for the release of part or all of the performance guarantee to the developer, and
a date after which the developer will be in default and the Town shall have access to the
funds to finish construction.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-17
C.
Escrow account.
A cash contribution to the establishment of an escrow account shall be made by either a
certified check made out to the municipality, the direct deposit into a savings account, or
the purchase of a certificate of deposit. For any account opened by the subdivider or site
plan developer, the municipality shall be named as owner or co-owner, and the consent
of the municipality shall be required for a withdrawal. Any interest earned on the escrow
account shall be returned to the subdivider or site plan developer.
D.
Performance bond.
A performance bond shall detail the conditions of the bond, the method for release of the
bond or portions of the bond to the subdivider or site plan developer, and the procedures
for collection by the municipality. The bond documents shall specifically reference the
subdivision or site plan for which approval is sought.
E.
Letter of credit.
An irrevocable letter of credit from a bank or other lending institution shall indicate that
funds have been set aside for the construction of the subdivision or site plan and may not
be used for any other project or loan.
F.
Phasing of development.
The Board may approve plans to develop a project or a major subdivision in separate and
distinct phases. This may be accomplished by limiting final approval to those lots
abutting that section of the proposed subdivision street which is covered by a performance
guarantee. When development is phased, road construction shall commence from an
existing public way. Final approval of lots in subsequent phases shall be given only upon
satisfactory completion of all requirements pertaining to previous phases.
G.
Release of guarantee.
Prior to the release of any part of the performance guarantee, the Planning Board shall
determine to its satisfaction, in part upon the report of the Code Enforcement Officer and
whatever other agencies and departments may be involved, that the proposed
improvements meet or exceed the design and construction requirements for that portion
of the improvements for which the release is requested.
H.
Default.
If, upon inspection, the Code Enforcement Officer finds that any of the required
improvements have not been constructed in accordance with the plans and specifications
filed as part of the application, he or she shall so report in writing to the Board of
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-18
Selectmen, the Planning Board, and the developer. The Board of Selectmen shall take
any steps necessary to preserve the Town's rights.
8.
STATUTORY CRITERIA
The Planning Board shall consider the following criteria before granting approval and shall
determine that for all site review or subdivision applications that, in addition to complying with
the performance standards of this Ordinance including Article 4 (Performance Standards), Article
3 (Shoreland Land Use) and Article 7 (Floodplain Management) the proposed development:
A.
Pollution. Will not result in undue water or air pollution. In making this determination
it shall at least consider:
1.)
The elevation of land above sea level and its relation to the flood plains;
2.)
The nature of soils and subsoils and their ability to adequately support waste
disposal;
3.)
The slope of the land and its effect on effluents;
4.)
The availability of streams for disposal of effluents; and
5.)
The applicable state and local health and water resources rules and regulations.
B.
Sufficient Water. Has sufficient water available for the reasonably foreseeable needs of
the development;
C.
Municipal water supply (not applicable)
D.
Erosion. Will not cause unreasonable soil erosion or a reduction in the land's capacity
to hold water so that a dangerous or unhealthy condition results;
E.
Traffic. Will not cause unreasonable highway or public road congestion or unsafe
conditions with respect to use of the highways or public roads existing or proposed and,
if the proposed subdivision requires driveways or entrances onto a state or state aid
highway located outside the urban compact area of an urban compact municipality as
defined by Title 23, Section 754, the Department of Transportation has provided
documentation indicating that the driveways or entrances conform to Title 23, Section
704 and any rules adopted under that section;
F.
Sewage Disposal. Will provide for adequate sewage waste disposal;
G.
Municipal Solid Waste Disposal. Will not cause an unreasonable burden on the
municipality's ability to dispose of solid waste, if municipal services are to be utilized;
H.
Aesthetic, Cultural, and Natural Values. Will not have an undue adverse effect on the
scenic or natural beauty of the area, aesthetics, historic sites, significant wildlife habitat
identified by the Department of Inland Fisheries and Wildlife or the municipality or rare
and irreplaceable natural areas or any public rights for physical or visual access to the
shoreline.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-19
I.
Conformity with Local Ordinances and Plans. Conforms with a duly adopted
subdivision regulation or ordinance, comprehensive plan, development plan, or land use
plan, if any. In making this determination, the Planning Board may interpret these
ordinances and plans.
J.
Financial and Technical Capability. The developer has adequate financial and technical
capacity to meet the standards of this section.
K.
Surface waters; outstanding river segments. Whenever situated entirely or partially
within the watershed of any great pond or lake or within 250 feet of any wetland, great
pond or river as defined in Title 38, chapter 3, subchapter 1, article 2-B, the proposed
subdivision will not adversely affect the quality of that body of water or unreasonably
affect the shoreline of that body of water.
L.
Groundwater. Will not, alone or in conjunction with existing activities, adversely affect
the quality or quantity of groundwater.
M.
Flood areas. Based on the Federal Emergency Management Agency's Flood Boundary
and Floodway Maps and Flood Insurance Rate Maps, and information presented by the
applicant whether the subdivision is in a flood-prone area. If the subdivision, or any part
of it is in such an area, the subdivider shall determine the 100-year flood elevation and
flood hazard boundaries within the subdivision. The proposed subdivision plan must
include a condition of plan approval requiring that principal structures in the subdivision
will be constructed with their lowest floor, including the basement, at least one foot above
the 100-year flood elevation;
N.
Freshwater Wetlands. All freshwater wetlands within the proposed subdivision have
been identified on any maps submitted as part of the application, regardless of the size of
these wetlands. Any mapping of freshwater wetlands may be done with the help of the
local soil and water conservation district;
O.
River, Stream or Brook. Any river, stream or brook within or abutting the proposed
subdivision has been identified on any maps submitted as part of the application. For
purposes of this section, "river, stream or brook" has the same meaning as in Title 38,
section 480-B, subsection 9.
P.
Storm Water. The proposed development will provide for adequate storm water
management.
Q.
Spaghetti-Lots Prohibited. If any lots in the proposed subdivision have shore frontage
on a river, stream, brook or great pond as these features are defined in Title 38, Section
480-B, none of the lots created within the subdivision have a lot depth to shore frontage
ratio greater than 5 to 1.).
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-20
R.
Lake Phosphorus Concentration. The long-term cumulative effects of the proposed
development will not unreasonably increase a great pond's phosphorus concentration
during the construction phase and life of the proposed development.
S.
Impact on Adjoining Municipality. For any proposed development that crosses
municipal boundaries, the proposed development will not cause unreasonable traffic
congestion or unsafe conditions with respect to the use of existing public ways in an
adjoining municipality in which part of the development is located.
T.
Lands subject to liquidation harvesting. Timber on the parcel being developed has not
been harvested in violation of rules adopted pursuant to Title 12, section 8869, subsection
14. If a violation of rules adopted by the Maine Forest Service to substantially eliminate
liquidation harvesting has occurred, the municipal reviewing authority must determine
prior to granting approval for the development that 5 years have elapsed from the date the
landowner under whose ownership the harvest occurred acquired the parcel. A municipal
reviewing authority may request technical assistance from the Department of
Conservation, Bureau of Forestry to determine whether a rule violation has occurred, or
the municipal reviewing authority may accept a determination certified by a forester
licensed pursuant to Title 32, chapter 76. If a municipal reviewing authority requests
technical assistance from the bureau, the bureau shall respond within 5 working days
regarding its ability to provide assistance. If the bureau agrees to provide assistance, it
shall make a finding and determination as to whether a rule violation has occurred. The
bureau shall provide a written copy of its finding and determination to the municipal
reviewing authority within 30 days of receipt of the municipal reviewing authority's
request. If the bureau notifies a municipal reviewing authority that the bureau will not
provide assistance, the municipal reviewing authority may require an applicant to provide
a determination certified by a licensed forester.
For the purposes of this subsection, "liquidation harvesting" has the same meaning as in
Title 12, section 8868, subsection 6 and "parcel" means a contiguous area within one
municipality, township or plantation owned by one person or a group of persons in
common or joint ownership. This subsection takes effect on the effective date of rules
adopted pursuant to Title 12, section 8869, subsection 14.
9.
SPECIFIC STANDARDS
The Planning Board shall determine that for all site review or subdivision applications the
following standards will be met.
A.
Buffering of adjacent uses. The development will provide for the buffering of adjacent
uses where there is a transition from one type of use to another use and for the screening
of service and storage areas. The buffer may be provided by distance, landscaping,
fencing, changes in grade, and/or a combination of these or other techniques.
B.
Buffering of residential uses. Any lot within the Urban Compact line of the community
that is used for nonresidential or multifamily residential purposes shall have a landscaped
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-21
buffer on any property line that abuts a residential use or residentially zoned lot. The
width of the buffer may vary depending on the treatment of the area. A buffer with dense
planting, fencing, or changes in grade may be as little as five (5) feet in width. A buffer
with moderate levels of planting should be ten (10) feet to fifteen (15) feet in width.
In all residential settings, the width of the vegetated buffer should be increased to a
minimum of twenty-five (25) feet. Areas adjacent to service, loading or storage areas
should be screened by dense planting, berms or a combination thereof.
C.
Conformance to Major Street plan. Where applicable, streets and other proposals and
specifications of the Major Street Plan shall be incorporated into the subdivision plat or
site plan, in the location and to the dimensions indicated in the Major Street Plan adopted
by the Planning Board. Such streets shall be deeded to the Town of Orrington.
D.
Conformance to future land use plan. When a proposed school site, or other public
building site, park, playground, or other land for public use is located in whole or in part
of the subdivision, the Planning Board may require that, as a prerequisite to plat approval,
such sites be reserved by the developer for acquisition by the appropriate municipal
agency.
Whenever a plat or plan proposes the dedication of land for public use that the Planning
Board finds not required or suitable for public use, the Board shall refuse to approve the
plat or plan.
E.
Curbs and gutters. The developer shall install curbs and gutters where and as required
by the Planning Board.
F.
Easements. Easements across lots shall be provided where necessary for utilities or
drainage. Such easements shall be centered on rear or side lot lines wherever possible,
and be wide enough for the purpose for which they are intended.
G.
Exterior lighting.
1.)
The proposed development must have adequate exterior lighting to provide for its
safe use during nighttime hours, if such use is contemplated.
2.)
Lighting may be used which serves security, safety and operational needs, but
which does not directly or indirectly produce deleterious effects on abutting
properties or which would impair the vision of a vehicle operator on adjacent
roadways. Lighting fixtures must be shielded or hooded so that the lighting
elements are not exposed to normal view by motorists, pedestrians, or from
adjacent dwellings and so that they do not light the night sky.
3.)
All exterior lighting, except where security lighting is necessary, must be turned
off between 11:00 PM and 6:00 AM unless located on the site of a commercial or
industrial use which is conducting business during that period.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-22
4.)
Building entrances may be illuminated using recessed lighting in overhangs and
soffits, or by use of spotlighting focused on the building entrances with the light
source concealed (e.g. in landscaped areas). Direct lighting of exterior building
areas is permitted only when necessary for security purposes, in limited areas.
H.
Hazardous waste. The applicant shall demonstrate compliance with Federal and State
laws and regulations when hazardous waste is generated or stored on site.
I.
Landscaping. The development plan will provide for landscaping that breaks up parking
areas, softens the appearance of the development and protects abutting properties from
any significant adverse impacts of the development. Only native plants shall be used for
landscaping. The use of invasive plants shall be discouraged.
J.
Large parcels. In case a tract is subdivided into larger parcels than ordinary building lots,
such parcels shall be arranged so as to allow the opening of future streets and logical
future re-subdivision.
K.
Lots. Lots shall front upon a public street. Lot lines shall be perpendicular or radial to
street lines. Lot dimensions shall meet the requirements of the ordinance for the district
or districts in which the subdivision is located. Corner lots shall be increased in size
wherever necessary so that any structure to be placed thereon shall conform to the
minimum setback line of each street as required by this Ordinance.
Flag Lots. The planning board may allow the creation of so-called "flag lots" in any
district, provided that:
1. Such lot meets the minimum right of way to street requirement of 50 feet with a
minimum road width of 20 feet.
2. Such access strip shall not be used in the computation of minimum lot areas and
dimensional requirements of the district for said rear lot.
3. Such rear lot meets the requirements of the district in which it lies (other than the
exemption of this section with regard to frontage). For the purposes of lot area
and yard requirements, the front yard setback line of such lots will be deemed to
be at the prescribed setback distance from the deepest rear property line of the lot
or lots between said rear lot and the nearest public street.
4. Only one tier of such rear lots shall be permitted behind the tier of lots fronting
on the street.
5. The access strip shall maintain a minimum width of 50 feet to the rear portion of
such lot and shall not exceed 200 feet in length.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-23
6. Flag lots shall not be created as part of a subdivision when located on a proposed
roadway, but may be proposed off existing roadways.
L.
Monuments. The developer shall install:
1.)
A concrete or stone monuments, not less than four (4) inches square, five (5) feet
long and four and one half (4 1/2) feet into the ground, at every street intersection,
angle point, beginning of curve and end of curve on either side of the road Right-
of-Way line. (Three quarter (3/4) inch drill hole in ledge with an Iron Pin grouted
in is acceptable as a monument).
2.)
If, in the opinion of the Planning Board, monuments are inappropriate Iron Pins
may be substituted. Iron Pins shall not be less than three-quarter (3/4) inches in
diameter, five (5) feet long, and four and one half (4 1/2) feet into the ground.
Locations of monuments other than above stated may be approved by the Planning Board
upon review.
M.
Noise. The development will control noise levels such that it will not create unreasonable
interference with use and enjoyment of neighboring properties.
N.
Storage of materials. Exposed nonresidential storage areas, exposed machinery and
areas used for the storage or collection of discarded automobiles, auto parts, metals or
other articles of salvage or refuse shall have sufficient setbacks and screening (such as a
stockade fence or a dense evergreen hedge) to provide a visual buffer sufficient to screen
the proposed use from abutting residential uses and users of public streets.
All dumpsters or similar large collection receptacles for trash or other waste shall be
located on level surfaces which are paved or graveled. Where the dumpster or receptacle
is located in a yard which abuts a residential or institutional use or a public street, it shall
be screened by fencing or landscaping.
Where a potential safety hazard to children is likely to arise, physical screening sufficient
to deter small children from entering the premises shall be provided and maintained in
good condition.
O.
Street name signs. The municipality shall be responsible for the erection of street name
signs at all street intersections. The developer will reimburse the municipality for
materials and labor.
P.
Subdivision or site plan names. The name of the subdivision or site plan shall not
duplicate or too closely approximate the name of any other subdivision within the
municipality.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-24
10.
STREET CONSTRUCTION STANDARDS
A.
Continuation. The arrangement of streets in the subdivision shall provide for the
continuation of the principal streets in adjoining subdivisions or for their proper
projection when adjoining property has not yet been subdivided, and in general conform
to the Comprehensive Plan. Existing streets should be continued at the same or greater
width, but in no case should they be extended at less than the original width. Collector
streets which extend continuously from one major street to another, crossing other
continuous streets, tend to develop accident patterns and should be avoided.
B.
Names. Street names shall require the approval of the Planning Board. Streets that are
obviously in alignment with streets already existing and named shall be given the name
of the existing street. Names of new streets shall not duplicate or closely approximate
those of existing streets.
C.
Jogs. Streets with center line offsets of less than 125 feet shall not be permitted.
D.
Street intersections. Street intersections shall be as nearly at right angles as possible.
No street intersection shall be at an angle of less than 60 degrees unless required by
unusual circumstances. The center lines of no more than two streets shall intersect at any
point except where approved by the Planning Board.
E.
Table of Geometric and Other Standards for Streets:
Arterial
Collector
Local
Streets
Streets
Streets
1. Minimum right-of-way width
80'
66'
50'
2. Minimum width of pavement
24'
24'
20'
3. Minimum grade
1%
1%
1%
4. Maximum grade
7%
8%
8%
5. Maximum grade at intersection
3% within 50 feet of intersection
6. Minimum angle of intersections
60 deg.
60 deg.
60 deg.
7. Width of shoulders
8'
8'
8'
8. Minimum center-line curve
radius
800'
200'
150'
9. Minimum tangent length
Between reverse curves
300'
200'
100'
10. Road base: Road base layers shall be installed over properly shaped and compacted
sub-grade. Sub-grade must be inspected by Road Commissioner or designees before
any aggregate is placed. Any soft spots or otherwise unsuitable soils encountered shall
either be over-excavated or otherwise reinforced (i.e., with geotextiles) to Road
Commissioner's (or designee) satisfaction before placing aggregate layers.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-25
The Developer shall provide test results of aggregate gradation to the Road
Commissioner or designee for review and approval BEFORE construction
commences. The following thicknesses of aggregate shall be applied in 6" to 8" layers
and compacted to a density equal to at least 95% of Modified Proctor density. The
Town reserves the right to hire an independent testing facility to verify that the in-
place densities are satisfactory.
Arterial
Collector
Local
Streets
Streets Streets
A. Base aggregate layer (MDOT
Type-A aggregate installed
beneath pavement layer
and over subbase);
6"
4"
3"
B. Subbase aggregate layer (MDOT
Type-D aggregate or better,
Installed beneath base layer and
over subgrade):
18" 16" 15"
Total Aggregate Thickness
24"
20"
18"
11. Pavement construction: Pavement shall be applied over approved (by Road
Commissioner or designee) aggregate surface only: Pavement shall be applied with
bituminous pavers of suitable width to pave roadway width in one pass; each layer
shall be applied in one pass and compacted to the depths shown below. Compaction
shall be carried out with suitable sized steel drum or pneumatic tire rollers so that the
density of in-place pavement is at least 93% of the TMD (theoretical maximum
density) as defined by the Maine Department of Transportation. In general, each
finished surface (binder and surface) shall be relatively smooth with no dips, tears, or
other preventable imperfections caused by careless paving techniques.
Arterial
Collector
Local
Streets
Streets Streets
A. Binder layer (MDOT grade-B
hot bituminous pavement layer)
2.5"
2"
1.5"
B. Surface course layer (MDOT
grade-C hot bituminous pavement
layer:
1.5" 1" 1"
Total pavement thickness
4.0"
3.0"
2.5"
Arterial
Collector
Local
Streets
Streets Streets
12. Road crown (minimum)
¼"/1 ft.
¼"/1 ft. ¼"/1 ft.
June 6, 2005 rev. July 1, 2010, June 6, 2011, June 3, 2013, June 2, 2014, June 6, 2016, July 27, 2020 June 6, 2022,
June 5, 2023
Site Plan and Subdivision Review
6-26
13. Sidewalks (where required)
Minimum width
6'
5'
5'
Base Course (aggregate)
12"
12"
12"
Surface Course (pavement)
2"
2"
2"
14. Cul-de-sac streets- min. radius:
A. Property line
75'
65'
55'
B. Outside Edge Pavement
60'
55'
50'
C. Inside Edge Pavement
45'
40'
35'
15. Curb radii at intersections:
90 degree intersections.
30'
25'
20'
less than 90 degree
intersections:
30'-40'
25'-35'
20'-
30'
16. Street cut and fill- Side slopes adjacent to travel shoulder shall not be steeper than 4:1
(25%); Slopes on opposite side of ditch can be steeper but no steeper than 2:1.
17. Adequate drainage of streets- A storm water management plan shall be prepared by a
registered professional engineer hired by the developer that will insure that all streets
shall be provided with adequate drainage facilities, and will also take into account any
offsite impacts/watersheds affecting the roadway or subdivision as well. Said plan
shall provide for the removal of storm water to prevent flooding of the pavement and
erosion of adjacent surface/properties. Open drainage structures shall be sized to
safely pass a 10 year, 24 hour storm event (4.65" of rainfall). The Planning Board
reserves the right to require storm water detention if necessary to reduce or eliminate
the potential for flooding of any developed areas, or areas deemed sensitive to the
impact of flooding, as a result of the subdivision development.
All structures with openings 15" or more in diameter shall be provided with a 4"
square intake screens or bars (on inlets only) to prevent children from being lodged
in pipes during storm events. Said screens or racks shall be attached in a manner to
facilitate removal by maintenance personal with appropriate hand tools and without
damage to the culvert.
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 1
ARTICLE 8 -- BOARD OF APPEALS
1.
ESTABLISHMENT AND ORGANIZATION
A Board of Appeals, hereafter referred to as the Board, is hereby established pursuant to Title
30-A M.R.S.A., Sections 2691 and 4353, Paragraph 1, and the Orrington Town Charter.
The Board shall adopt rules necessary to the conduct of its affairs. The Chairman, or in his
absence the Acting Chairman, may administer oaths and compel the attendance of witnesses. All
meetings shall be open to the public. The Board shall keep minutes of its proceedings and other
official actions, all of which shall be a public record and immediately filed in the Town Office.
2.
APPEALS
An appeal may be taken from any decision of the Code Enforcement Officer or Planning Board
to the Board of Appeals and from the Board of Appeals to the Superior Court, pursuant to Title
30-A M.R.S.A., Section 4353, Paragraph 1.
3.
POWERS AND DUTIES OF THE BOARD OF APPEALS
The Board of Appeals shall have the following powers:
A.
Interpretation. To interpret provisions of the Ordinance which are called into question,
in accordance with the provisions of Title 30-A M.R.S.A., Section 4353. An applicant
may appeal the denial of a permit that was based on an interpretation of a provision of
this Ordinance.
B.
Administrative Appeal - To hear and decide administrative appeals, on an appellate
basis, upon written application of an aggrieved party, where it is alleged by an aggrieved
party that there is an error in any order, requirement, decision, or determination made by,
or failure to act by Planning Board in the administration of this Ordinance; and to hear
and decided administrative appeals on a de novo basis where it is alleged by an aggrieved
party that there is an error, requirement, decision or determination made by, or failure to
act by, the Code Enforcement Officer in his or her review of and action on a permit
application under this ordinance. Any order, requirement, decision ore determination
made, or failure to act, in the enforcement of this ordinance is not appealable to the Board
of Appeals.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an
appellate hearing, and may reverse the decision of the Planning Board only upon finding
that the decision was contrary to specific provisions on the Ordinance or contrary to the
facts presented to the Planning Board. The Board of Appeals may only review the record
of the proceedings before the Planning Board. The Board of Appeals shall not receive or
consider any evidence which was not presented to the Planning Board, but the Board of
Appeals may receive written or oral arguments. If the Board of Appeals determines that
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 2
the record of the Planning Board proceedings are inadequate, the Board of Appeals may
remand the matter to the Planning Board for additional fact finding.
C.
Variance Appeal - To authorize variances upon appeal, within the limitations set forth
in this Ordinance. A variance is a setting aside of one or more requirements of this
Ordinance, and is equivalent to permission to not comply with one or more of its
provisions. A variance is not a permit. An applicant who receives a variance shall comply
with all other requirements of this Ordinance including the requirement to obtain a permit
from the Code Enforcement Officer or Planning Board, as applicable.
4.
STANDARDS FOR VARIANCES
Variances may be permitted only under the following conditions:
A.
Variances may be granted only from dimensional requirements including but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
B.
Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
C.
The proposed structure or use would meet the provisions of this Ordinance except for the
specific provision which has created the non-conformity and from which relief is sought.
D.
The Board shall not grant a variance unless it finds that the petitioner for such a variance
can demonstrate, upon appeal that the strict application of the terms of this Ordinance
would result in undue hardship. The term "undue hardship" shall mean:
1.)
That the land in question cannot yield a reasonable return unless a variance is
granted; and
2.)
That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood; and
3.)
That the granting of a variance will not alter the essential character of the locality;
and
4.)
That the hardship is not the result of action taken by the applicant or a prior
owner.
A variance is not justified unless all four elements of an undue hardship are present in
the case.
E.
Variances shall only be issued upon a determination that the variance is the minimum
necessary, considering all possible effects including Shoreland Districts and flood
hazard, to afford relief. Notwithstanding Section 4.D above, the Board of Appeals may
grant a variance to an owner of a residential dwelling for the purpose of making that
dwelling accessible to a person with a disability who resides in or regularly uses the
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 3
dwelling. The board shall restrict any variance granted under this subsection solely to the
installation of equipment or the construction of structures necessary for access to or
egress from the dwelling by the person with the disability. The board may impose
conditions on the variance, including limiting the variance to the duration of the disability
or the time that the person with the disability live in the dwelling. The term "structures
necessary for access to or egress from the dwelling" shall include railings, wall or roof
systems necessary for the safety or effectiveness of the structure.
F.
A financial hardship shall not constitute grounds for granting a variance.
G.
The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
H.
The Board of Appeals shall submit to the Town Manager a report of all variance actions,
including justification for the granting of the variance and an authorization for the CEO
to issue a Flood Hazard Development Permit, which includes any conditions to be
attached to said permit. In addition a copy of each variance request, including the
application and all supporting information supplied by the applicant, shall be forwarded
by the municipal official to the Commissioner of the Department of Environmental
Protection at least twenty (20) days prior to the action by the Board of Appeals. Any
comments received from the Commissioner prior to the action by the Board of Appeals
shall be made part of the record and shall be taken into consideration by the Board of
Appeals.
I.
A copy of all variances granted by the Board of Appeals, pertaining to shoreland zoned
properties shall be submitted to the Department of Environmental Protection within
seven (7) days of the decision.
5.
FLOODPLAIN MANAGEMENT VARIANCES
In addition to the provisions of Article 8, Section 4, immediately above, the following shall also
apply in cases involving requests for variances from the requirements of Article 7, Floodplain
Management, of this Ordinance.
A.
Variances shall not be granted within any designated regulatory floodway if any increase
in flood levels during the base flood discharge would result.
B.
Variances shall be granted only upon:
1.)
a showing of good and sufficient cause; and
2.)
a determination that should a flood comparable to the base flood occur, the
granting of a variance will not result in increased flood heights, additional threats
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 4
to public safety, public expense, or create nuisances, cause fraud or victimization
of the public or conflict with existing local laws or ordinances; and,
3.)
a showing that the issuance of the variance will not conflict with other state,
federal or local laws or ordinances.
C.
Variances may be issued for new construction, substantial improvements, or other
development for the conduct of a functionally dependent use provided that:
1.)
other criteria of Article 8, Section 4 and Article 7, Section 6, are met; and,
2.)
the structure or other development is protected by methods that minimize flood
damages during base flood and create no additional threats to public safety.
D.
Variances may be issued for the reconstruction, rehabilitation, or restoration of structures
listed on the National Register of Historic Places or a State Inventory of Historic Places,
upon a determination that:
1.)
The development meets the criteria of Article 8 Sections 1 through 5D. above;
and
2.)
The proposed repair, reconstruction, rehabilitation or restoration will not
preclude the structure's continued designation as a Historic Structure and the
variance is the minimum necessary to preserve the historic character and design
of the structure.
E.
Any applicant who meets the criteria of Article 8, Section1 through 5.D, above, shall be
notified by the Board of Appeals in writing that:
1.)
the issuance of a variance to construct a structure below the base flood level will
result in greatly increased premium rates for flood insurance;
2.)
such construction below the base flood level increases risks to life and property;
and,
3.)
the applicant agrees in writing that the applicant is fully aware of all the risks
inherent in the use of land subject to flooding, assumes those risks and agrees to
indemnify and defend the municipality against any claims filed against it that are
related to the applicant's decision to use land located in a floodplain and that the
applicant individually releases the municipality from any claims that the
applicant may have against the municipality that are related to the use of land
located in a floodplain.
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 5
6.
APPEAL PROCEDURE
A.
Making an Appeal
1.)
An administrative or variance appeal, upon written application of an aggrieved
party, may be taken to the Board of Appeals by an aggrieved party from any
decision of the Code Enforcement Officer or the Planning Board, except for
enforcement-related matters as described in Article 8 Section 3.B above. Such an
appeal shall be taken within thirty (30) days of the date of the official written
decision appealed from, and not otherwise, except that the Board, upon a showing
of good cause, may waive the thirty (30) day requirement.
2.)
Applications for appeals shall be made by filing with the Board of Appeals a
written notice of appeal which includes:
a.
A concise written statement indicating what relief is requested and why the
appeal or variance should be granted.
b.
A sketch drawn to scale showing lot lines, location of existing buildings
and structures and other physical features of the lot pertinent to the relief
sought.
3.)
Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the
Board of Appeals all of the papers constituting the record of the decision being
appealed.
4.)
The Board of Appeals shall hold a public hearing on an administrative appeal or
a request for a variance within thirty-five (35) days of its receipt of a complete
written application, unless this time period is extended by the parties.
B.
Decision by Board of Appeals
1.)
A majority of the full voting membership of the board shall constitute a quorum
for the purpose of deciding an appeal.
a.
If the Board of Appeals finds that the action or failure to act of the Code
Enforcement Officer or Planning Board is clearly contrary to the specific
provisions of this Ordinance, it shall order the error to be corrected. The
Board of Appeals shall have no authority to take the action of the Code
Enforcement Officer or Planning Board, or force compliance or issue a
permit. If the Code Enforcement Officer or Planning Board ignores an
order of the Board of Appeals, the applicant may take court action to
force compliance.
b.
An appeal shall not be heard "de novo" by the Board of Appeals, but
rather shall be reviewed to determine whether the action of the Code
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 6
Enforcement Officer or Planning Board was within the scope of its
authority and supported by substantial evidence on the record.
c.
In the event that the Board of Appeals finds that the action or failure to
act of the Code Enforcement Officer or Planning Board is contrary to the
provisions of this Ordinance, or that the decision or record of proceedings
is incomplete, the Board of Appeals shall refer the matter back to the
Code Enforcement Officer or Planning Board for further proceedings or
completion of the decision or record, as appropriate. Upon referral by
the Board of Appeals, the Code Enforcement Officer or Planning Board
shall complete the necessary further proceedings within sixty (60) days.
No matter appealed to the Board of Appeals shall be referred back to the
Code Enforcement Officer or Planning Board more than twice, over the
objection of any party.
2.)
The person filing the appeal shall have the burden of proof.
3.)
The Board shall decide all appeals within thirty five (35) days after the close of
the hearing, and shall issue a written decision on all appeals.
4.)
All decisions shall become a part of the record. The Board of Appeals shall state
the reasons and basis for its decision, including a statement of the facts found and
conclusions reached by the Board. The Board shall cause written notice of its
decision to be mailed or hand-delivered to the applicant and to the Department of
Environmental Protection (DEP notification required if matter regards Shoreland
Zoned property) within seven (7) days of the Board's decision. Copies of written
decisions of the Board of Appeals shall be given to the Planning Board, Code
Enforcement Officer, and the municipal officers. All decisions shall become a part
of the record and shall include a statement of findings and conclusions as well as
the reasons or basis therefore, and the appropriate order, relief or denial thereof.
C.
Appeal to Superior Court
Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take an
appeal to Superior Court in accordance with State laws within forty-five (45) days from
the date of any decision of the Board of Appeals.
D.
Reconsideration
In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board to reconsider a decision must be filed within ten (10) days of the decision that is
being reconsidered. A vote to reconsider and the action taken on that reconsideration must
occur and be completed with forty-five (45) days of the date of the vote on the original
decision. Reconsideration of a decision shall require a positive vote of the majority of the
June 6, 2005, rev. June 6, 2011, June 6, 2022
Board of Appeals
8 - 7
Board members originally voting on the decision, and proper notification to the
landowner, petitioner, planning board, code enforcement officer, and other parties of
interest including abutters and those who testified at the original hearing(s). The Board
may conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15)
days after the decision on reconsideration.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-1
ARTICLE 9 -- DEFINITION OF TERMS IN THIS ORDINANCE
1.
GENERAL DEFINITIONS
For the purpose of this Ordinance certain words or terms used shall be interpreted as follows:
"Town" or "Municipality" means the Town of Orrington.
"State" means the State of Maine
"Official Zoning Map" means the most recent Land Use District map certified and dated by the
Town Clerk.
The present tense includes the future tense, the singular includes the plural, and the plural includes
the singular.
The word "shall" is mandatory; the word "may" is permissive.
The word "person" includes a firm, association, organization, partnership, trust, company or
corporation as well as an individual.
The word "lot" includes the word "plot" or "parcel", and the word "building" includes the word
"structure."
The word "used" or "occupied" shall be construed to include the words "intended, arranged, or
designed to be used or occupied."
Drafting film shall refer to polyester drafting media now or formally known as Mylar, polyester
film, or transparency.
2.
LIST OF DEFINITIONS
Accessory building, structure or use - A use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated shall not subordinate the principal use of
the lot. An extension of the principal structure or a garage attached to the principal structure by a roof
or a common wall is considered part of the principal structure. An open deck is not considered part of
the principal structure except in all of the shoreland districts.
Accessory dwelling unit - An ADU is typically an additional living area independent of the primary
dwelling that may have been added to, created within, or detached from a primary dwelling. The primary
dwelling being a single family, duplex or multi-family structure. The ADU must provide for living,
sleeping, cooking, and bathroom facilities and be on the same parcel as the primary dwelling. An
Accessory Dwelling Unit cannot be conveyed as a primary dwelling. Recreational vehicles are not
accessory dwelling units.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-2
Accessory structure (for floodplain management purposes) - A structure which is on the same parcel
of property as a principal structure and the use of which is incidental to the use of the principal structure.
Adjacent grade (for floodplain management purposes) - The natural elevation of the ground surface
prior to construction next to the proposed walls of a structure or excavation.
Aggrieved party - An owner whose property is directly or indirectly affected by the granting or denial
of a permit or variance under the Ordinance; a person whose land abuts land for which a permit or
variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture - The production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy
products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green house
products. Agriculture does not include forest management and timber harvesting activities.
Agricultural Facility - Property used for pasture lands, row crops, orchards, wood lots, beehives,
fishponds, and similar agricultural activities. Passive agricultural uses do not include animal production
units, packing houses, agricultural stands, plant farms and greenhouses, poultry and egg farms, dairies,
public and private stables, farm worker housing and labor camps, agricultural manufacturing, and any
agricultural activity with significant structural coverage or off-site impacts.
Agricultural Greenhouses, High Tunnels and Caterpillar Tunnels - Construction of tunnels and
greenhouses are intended to extend the growing season and maximize crop production or as cost effective
livestock housing or equipment storage on a farm. These uses are considered pieces of farm equipment
and not structures that require building permits, provided they can reasonably be relocated or removed
without material damage to the soils on the property. They are also exempt from associated fees. If these
uses are placed on a slab or a permanent foundation, they would be considered structures and lose the
exempt status.
Alteration of building - Any change in the supporting members of a building (such as bearing wall,
beams, columns, girders) except such change as may be required for its safety; any additions to a building
or moving a building from one location to another.
Alternative Energy Production - Production of alternative clean energy derived from a natural and
renewable source such as solar, wind, geothermal, waves, tides, waste, biomass, hydrogen, etc.
Aquaculture - The growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Area of special flood hazard - The land in the floodplain having a one percent or greater chance of
flooding in any given year, as specifically identified in the Flood Insurance Study cited in Article 7,
Section 1. of this Ordinance.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-3
Automobile graveyard - A yard or field used as a place of storage in which there is displayed to the
public view three or more unregistered or uninspected, unserviceable, discarded, worn-out or junked
vehicles or bodies or engines thereof.
Automobile repair facility - An individual, corporation or other legal entity which repairs motor
vehicles for the general public for compensation.
Base flood - A flood having a one percent chance of being equaled or exceeded in any given year,
commonly called the 100-year flood.
Basal Area - The area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of
bark.
Basement - Any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more
than 50% of its volume below the existing ground level.
Basement (for floodplain management purposes) - any area of the building having its floor subgrade
(below ground level) on all sides.
Bed & breakfast - A dwelling structure which offers sleeping quarters and breakfast to temporary guests
for payment.
Boarding and riding stable - A structure that is used commercially for the shelter of horses.
Boat launching facility - A facility designed primarily for the launching and landing of watercraft, and
which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Breakaway wall - A wall that is not part of the structural support of the building and is intended through
its design and construction to collapse under specific lateral loading forces, without causing damage to
the elevated portion of the building or supporting foundation system.
Building - Any structure affording shelter. Also see structure.
Building frontage - Measured in a single straight line from corner to corner of the building, which line
would be most parallel to the street address entrance.
Bureau - State of Maine Department of Conservation's Bureau of Forestry.
Business sign - A sign on which is announced the business use of the premises or the name of the
operator of the business.
Business Park - A track of land that has been planned and developed as a high density mixed industrial
and commercial district that shall permit uses as specified under Industrial District and Commercial
District in Article 2, except that no expanded uses beyond those permitted uses for Mixed Residential-
Commercial District (MR-C) shall be permitted in any MR-C district as mapped on the Land Use District
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-4
Map, and further restricting that no single or multi-family residential uses shall be permitted anywhere
in the Industrial or Commercial use portion of the Business Park.
Campground - Any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - The more or less continuous cover formed by tree crowns in a wooded area.
Certificate of compliance (for floodplain management purposes) - A document signed by the Code
Enforcement Officer stating that a structure is in compliance with all of the provisions of this Ordinance.
Coastal wetland - All tidal and subtidal lands; all lands with vegetation present that is tolerant of salt
water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh, bog, beach, flat
or other contiguous low land that is subject to tidal action during the highest tide level for the year in
which an activity is proposed as identified in tide tables published by the National Ocean Service.
Coastal wetlands may include portions of coastal sand dunes.
Note: All areas below the highest annual tide level are coastal wetlands. These areas may consist of
rocky ledges, sand and cobble beaches, mud flats, etc., in addition to salt marshes and salt meadows.
Code Enforcement Officer (CEO) - A person certified under Title 30-A MRSA, Section 4451
(including exceptions in subsection 4451, paragraph 1) and employed by a municipality to enforce all
applicable comprehensive planning and land use laws and ordinances.
Commercial recreation - Outdoor recreation activities supplied for a price (including incidental sale of
goods) such as: camping area, boat rental, miniature golf, golf and similar outdoor games but excluding
places of amusement such as movie theaters, cocktail lounges, dance halls, pool halls, nightclubs, etc.
Commercial use - The use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling of
goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Developable area- Land above the normal high-water line of a water body or upland edge of a wetland.
Development - Changes in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Development (for floodplain management purposes) - any man made change to improved or
unimproved real estate. This includes, but is not limited to, buildings or other structures; mining,
dredging, filling, grading, paving, excavation, drilling operations or storage of equipment or materials;
and the storage, deposition, or extraction of materials.
Dimensional requirements - Numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-5
Disability - Any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by a bodily injury, accident, disease, birth defect, environmental conditions or illness;
and also included the physical or mental condition of a person which constitutes a substantial handicap
as determined by a physician or in the case of mental handicap, by a psychiatrist or psychologist, as well
as any other health or sensory impairment which requires special education, vocational rehabilitation or
related services.
Distribution Facility - A distribution facility is a warehouse or other specialized building, often with
refrigeration or air conditioning, which is stocked with products to be redistributed to retailers, to
wholesalers, or directly to consumers. A distribution center is a principal part, the order processing
element, of the entire order fulfillment process.
Driveway- A vehicular access way less than five hundred (500) feet in length serving two single-family
dwellings or one two-family dwelling, or less.
Duplex - A two family primary dwelling unit.
Ecological Production - Processes that produce organic matter, transfer carbon and nutrients, drive soil
formation and enable organisms to reproduce.
Elevated building (for floodplain management purposes)- A non-basement building:
1.) built, in the case of a building in Floodplain Zones (Districts) AE or A, to have the top of the
elevated floor elevated above the ground level by means of pilings, columns, post, piers, or shear
walls; and,
2.)
adequately anchored so as not to impair the structural integrity of the building during a flood of
up to one foot above the magnitude of the base flood.
In the case of Zones (Districts) AE or A, Elevated Building also includes a building elevated by means
of fill or solid foundation perimeter walls with hydraulic openings sufficient to facilitate the unimpeded
movement of flood waters, as required in Article 7 Section 6. N.
Elevation certificate (for floodplain management purposes)- An official form (FEMA Form 81-31,
as amended) that:
1.)
is used to verify compliance with floodplain management regulations of the National Flood
Insurance Program; and,
2.)
is required for purchasing flood insurance.
Emergency operations - Operations conducted for the public health, safety or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement, and operations to rescue
human beings, property and livestock from the threat of destruction or injury.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-6
Essential services - Gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection
or supply systems; and associated storage tanks. Such systems may include towers, poles, wires, mains,
drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar
accessories, but shall not include service drops or buildings which are necessary for the furnishing of
such services.
Expansion of a structure - An increase in the floor area or volume of a structure, including all
extensions such as, but not limited to attached: decks, garages, porches and greenhouses.
Expansion of use - The addition of one or more months to a use's operating season; or the use of more
floor area or ground area devoted to a particular use.
Family - One or more persons occupying a dwelling unit and living in a single residential dwelling unit.
Flood or Flooding
1.)
A general and temporary condition of partial or complete inundation of normally dry land areas
from:
a.
The overflow of inland or tidal waters.
b.
The unusual and rapid accumulation or runoff of surface waters from any source.
2.)
The collapse or subsidence of land along the shore of a lake or other body of water as a result of
erosion or undermining caused by waves or currents of water exceeding anticipated cyclical
levels or suddenly caused by and unusually high water level in a natural body of water,
accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood or an
abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in
flooding as defined in paragraph 1.)a. of this definition.
Flood elevation study (for floodplain management purposes)- An examination, evaluation and
determination of flood hazards and, if appropriate, corresponding water surface elevations.
Flood Insurance Rate Map (FIRM) (for floodplain management purposes) - An official map of a
community, on which the Federal Insurance Administrator has delineated both the special hazard areas
and the risk premium districts applicable to the community.
Flood insurance study (for floodplain management purposes)- See Flood elevation study.
Floodplain or flood-prone area - Any land area susceptible to being inundated by water from any source
(see flooding).
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-7
Floodplain management (for floodplain management purposes)- The operation of an overall program
of corrective and preventive measures for reducing flood damage, including but not limited to emergency
preparedness plans, flood control works, and floodplain management regulations.
Floodplain management regulations (for floodplain management purposes)- Land Use ordinances,
subdivision regulations, building codes, health regulations, special purpose ordinances (such as
floodplain ordinance, grading ordinance, and erosion control ordinance) and other applications of police
power. The term describes such state or local regulations, in any combination thereof, which provide
standards for the purpose of flood damage prevention and reduction.
Floodproofing (for floodplain management purposes) - Any combination of structural and non-
structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to
real estate or improved real property, water and sanitary facilities, structures and contents.
Floodway - The channel of a river or other watercourse and adjacent land areas that must be reserved in
order to discharge the 100-year flood without cumulatively increasing the water surface elevation by
more than one foot in height.
Floodway (for floodplain management purposes)- see Regulatory Floodway.
Floodway encroachment lines (for floodplain management purposes) - The lines marking the limits
of floodways on federal, state, and local floodplain maps.
Floor area - The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls,
plus the horizontal area of any unenclosed portions of a structure such as porches and decks.
Forest management activities - Timber cruising and other forest resource evaluation activities,
pesticide or fertilizer application, management planning activities, timber stand improvement, pruning,
regeneration of forest stands, and other similar or associated activities, exclusive of timber harvesting
and the construction, creation or maintenance of roads.
Forested wetland - A freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - The supporting substructure of a building or other structure, excluding wooden sills and
post supports, but including basements, slabs, frost walls, or other base consisting of concrete, block,
brick or similar material.
Freeboard (for floodplain management purposes) - A factor of safety usually expressed in feet above
a flood level for purposes of floodplain management. Freeboard tends to compensate for the many
unknown factors, such as wave action, bridge openings, and the hydrological effect of urbanization of
the watershed, that could contribute to flood heights greater than the height calculated for a selected size
flood and floodway conditions.
Freshwater wetland - Freshwater swamps, marshes, bogs and similar areas which are including forested
wetlands:
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-8
1.)
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface
water body, excluding any river, stream or brook such that in a natural state, the combined
surface area is in excess of 10 acres; and
2.)
Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to
support, and which under normal circumstances do support, a prevalence of wetland vegetation
typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the
criteria of this definition.
Frontage - The horizontal distance between the intersections of the side lot lines and the front building
line.
Front yard - Space on the same lot with a principal building extending the full width of the lot and
located between the street line and the front line of the building projected to the side lines of the lot. The
depth of the front yard is the distance between the street line and the front of the building.
Functionally dependent uses - Those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that cannot
be located away from these waters. The uses include, but are not limited to commercial and recreational
fishing and boating facilities, excluding recreational boat storage buildings, finfish and shellfish
processing, fish storage and retail and wholesale fish marketing facilities, waterfront dock and port
facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels, retaining
walls, industrial uses dependent upon water-borne transportation or requiring large volumes of cooling
or processing water that cannot reasonably be located or operated at an inland site, and uses that primarily
provide general public access to coastal or inland waters.
Functionally dependent use (for floodplain management purposes) - A use which cannot perform its
intended purpose unless it is located or carried out in close proximity to water. The term includes only
docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers,
and ship building and ship repair facilities, but does not include long-term storage or related
manufacturing facilities.
Great pond - Any inland body of water which in a natural state has a surface area in excess of ten acres,
and any inland body of water artificially formed or increased which has a surface area in excess of thirty
(30) acres except for the purposes of this Ordinance, where the artificially formed or increased inland
body of water is completely surrounded by land held by a single owner.
Green Energy Facilities/Services - Facilities that produce energy that can be produced in a way that
protects the natural environment with the utilization of wind, water, or the sun.
Greenhouse/Hydroponics Facility - A production facility where plants are grown in nutrient solution
rather than soil. The Greenhouse and environment control system are the same whether plants are grown
conventionally or with hydroponics.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-9
Green space - An area of land that features scenic, recreational, or similar amenities encompassed by a
development plan or site plan. This space must generally be available for entry and use by the
occupants of the site. The site may include a limited area that provides landscaping features or
landscape screening for the benefit of the occupants.
Green space shall include, but is not limited to, features such as lawns, decorative plantings, active and
passive recreational areas including wooded areas, watercourses and wetlands and any other space
maintained in a natural, undisturbed or revegetated condition.
Green space does not include the area of any sidewalks, walkways, parking lots or vehicular surfaces
used by any motor vehicle, primary and/or accessory building footprints, or areas of open space so
located, or circumscribed by buildings, parking, or drainage areas as to have no substantial value for
the purposes stated in this definition.
Group development- A project (residential, commercial, industrial, educational, medical, civic, etc.)
with two or more principal buildings constructed on a parcel of at least 2 acres not subdivided into
customary lots and streets.
Ground cover - Small plants, fallen leaves, needles and twigs, and the partially decayed organic matter
of the forest floor.
Height of a structure - The vertical distance between the mean original (prior to construction) grade at
the downhill side of the structure and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances that have no floor area.
Historic structure - Any structure that is:
1.)
Listed individually in the National Register of Historic Places (a listing maintained by the
Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting
the requirements for individual listing on the National Register;
2.)
Certified or preliminarily determined by the Secretary of the Interior as contributing to the
historical significance of a registered historic zone (district) or a district preliminarily determined
by the Secretary of the Interior to qualify as a registered historic zone (district);
3.)
Individually listed on a state inventory of historic places in states with historic preservation
programs which have been approved by the Secretary of the Interior; or
4.)
Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified either:
a.
By an approved state program as determined by the Secretary of the Interior, or
b.
Directly by the Secretary of the Interior in states without approved programs.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-10
Home occupation: Craft production and other manufacturing of goods, and both professional and
personal services, within the limits on number of employees established in other sections of this
Ordinance. A home occupation shall offer for sale only those items which are associated with the above
activities.
1.) Low Density Residential District Home Occupation: An occupation or profession which is carried
on in no more than 25% of the ground floor area of a single family dwelling unit or accessory
structure by the full-time occupant(s) of the dwelling unit. The use must be clearly incidental and
secondary to the use of the dwelling for residential purposes, and shall not change the character
thereof.
2.) Rural Residential and Farming District Home Occupation: An occupation or profession which is
carried on in no more than 25% of the ground floor area of a single family dwelling unit or 100%
ground floor area of an accessory structure by the full time occupant(s) of the dwelling unit and shall
not employ more than three (3) persons who are not permanent residents of the dwelling unit. The
use must be clearly incidental and secondary to the use of the dwelling for residential or agricultural
purposes, and shall not change the character thereof.
3.) Shoreland Districts Home Occupation: an occupation or profession which is clearly incidental to and
compatible with the residential use of the property and surrounding residential use, and which
employs no more than two (2) persons other than family members residing in the home.
Impermeable (Impervious) surface: Impermeable (Impervious) surface means those improved,
harder-surface areas that either prevent or inhibit the natural entry of water into the soil. Rooftops,
buildings, streets, parking lots, sidewalks, asphalt, concrete, other paving, driveways, gravel, patios,
artificial turf and storage areas are all examples of impervious surfaces.
Increase in nonconformity of a structure: Any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not limited
to, reduction in water body, tributary stream or wetland setback distance, increase in lot coverage, or
increase in height of a structure. Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear extent of nonconformance of the
existing structure shall not be considered to increase nonconformity. For example, there is no increase
in nonconformity with the setback requirement for water bodies, wetlands, or tributary streams if the
expansion extends no further into the required setback area than does any portion of the existing
nonconforming structure. Hence, a structure may be expanded laterally provided that the
expansion extends no closer to the water body, tributary stream, or wetland than the closest portion of
the existing structure from that water body, tributary stream, or wetland. Included in this allowance
are expansions which in-fill irregularly shaped structures.
Individual private campsite - An area of land which is not associated with a campground, but which
is developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-11
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods,
or the extraction of minerals.
Industrial Park - A tract of land that has been planned, developed and operated as an integrated facility
for a number of industrial uses, with special attention to circulation, parking, utility needs, aesthetics,
and compatibility.
In-law apartment - A separate dwelling unit which is located within and subordinate to a single family
detached dwelling and which is occupied by a person or persons related to the owner and principal
occupant of the dwelling unit by blood, marriage or adoption, whether or not said person(s) pay rent or
share expenses with the owner thereof.
Institutional: A non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Invasive plants - Vegetation which is not native or indigenous to the area and which tends to spread in
the natural environment to the detriment of native vegetation.
Junk yard - A yard or field used as a place of storage for old, discarded, worn-out, or junked plumbing,
heating supplies, household appliances, furniture, lumber, rope, rags, batteries, paper, trash, rubber,
ferrous or non-ferrous metal.
Kennel - Any commercial establishment where dogs are kept, offered for sale or boarded for a fee.
Land Management Road: A route or track consisting of a bed of exposed mineral soil, gravel, or
other surfacing materials constructed for, or created by, the passage of motorized vehicles and used
primarily for timber harvesting and related activities, including associated log yards, but not including
skid trails or skid roads.
Licensed Forester: - A forester licensed under 32 M.R.S.A. Chapter 76.
Light manufacturing - The fabrication or processing of material into a finished product. Fabrication
relates to the stamping, cutting or otherwise shaping the processed materials into useful objects/products.
Light manufacturing does not include the refining or other initial processing of basic raw materials such
as ore or lumber.
Locally established datum - For purposes of this Ordinance, an elevation established for a specific site
to which all other elevations at the site are referenced. This elevation is generally not referenced to the
National Geodetic Vertical Datum (NGVD) or any other established datum and is used in areas where
Mean Sea Level data is too far from a specific site to be practically used.
Lot - A parcel of land occupied by one building and the accessory buildings used customarily incidental
to it, including such yards as are required by this Ordinance, and having frontage upon a roadway, public
or private. However, a lot, the closest boundary of which is at least 200 feet from a road, public or
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-12
private, shall be acceptable if area and yard requirements as required by this Ordinance are met and said
lot is not landlocked. (See also Minimum Lot Width, for shoreland district.)
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more than
two lots.
Lot coverage - Lot coverage shall include those areas covered by buildings, other manmade structures,
and other impervious (impermeable) areas.
Lot of record - A parcel of land, the dimensions of which are shown on a document or map on file with
the County Register of Deeds or in common use by town or county officials.
Lot width - The distance between the side boundaries of the lot measured at the front building line drawn
parallel to the chord drawn between the intersections of the side lot lines at the street line. The building
line is to be construed at the setback line unless building locations are included in the proposed plan. See
applicable tables 2-2 or 3-2 for dimension requirements.
Lowest floor - The lowest floor of the lowest enclosed area (including basement). An unfinished or
flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other
than a basement area is not considered a building's lowest floor, provided that such enclosure is not built
so as to render the structure in violation of the applicable non-elevation design requirements described
in Article 7 Section 6.N. of this Ordinance.
Major street - A street designated as such in the Major Street Plan.
Manufacturing/Assembly/Production Facility - A facility or use associated with the mechanical or
chemical transformation of materials or substances into new products. Uses such as plants, factories, or
mills and characteristically use power driven machines and materials handling equipment.
Establishments engaged in assembling component parts of manufactured products are also considered
under this definition if the new product is neither a fixed structure nor other fixed improvement. Also
included is the blending of materials such as lubricating oils, plastics resins, or liquors.
Manufactured homes - As defined by and as amended and in compliance with MRSA Title 30-A,
Section 4358.
Manufactured Home (for floodplain management purposes) - a structure, transportable in one or
more sections, which is built on a permanent chassis and is designed for use with or without a permanent
foundation when connected to the required utilities. For floodplain management purposes the term
manufactured home also includes park trailers, travel trailers, and other similar vehicles placed on a site
for greater than 180 consecutive days.
Manufactured home park or subdivision (for floodplain management purposes)- A parcel (or
contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-13
Marina - A business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - The estimated price a property will bring in the open market and under prevailing market
conditions in a sale between a willing seller and a willing buyer, both conversant with the property and
with prevailing general price levels.
Mean sea level (MSL) (for floodplain management purposes) - for purposes of the National Flood
Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929, North American Vertical
Datum (NAVD), or other datum to which base flood elevations shown on a community's Flood Insurance
Rate Map are referenced.
Mineral exploration - Hand sampling, test boring, or other methods of determining the nature or extent
of mineral resources which create minimal disturbance to the land and which include reasonable
measures to restore the land to its original condition.
Mineral extraction - Any operation within any twelve (12) month period which removes more than one
hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from
its natural location and transports the product removed, away from the extraction site.
Mineral Processing - The term mineral processing shall mean the screening, sorting, crushing or other
processing of geologic material extracted or excavated.
Mineral Storage - The term mineral storage shall mean the storage of sand, gravel crushed stone, or
soil stock piles or other forms.
Mineral Transportation - The term mineral transportation shall mean using the public roads in Orrington
to haul sand, mineral, crushed stone or soil except for snow plowing and sanding operations.
Mineral Pit - The term mineral pit shall mean:
1. All of the land area used in the extraction, processing, or storage of sand mineral, crushed stone or
soil; and
2. All of the land are owned by the mineral pit owner that is contiguous to an excavated area unless
the mineral pit owner can show that some portion of that land cannot or will not be used as a site
for mineral extraction or excavation.
Mineral pits owned and/or operated by the same person, firm, or corporation, and separated by
less than 800 horizontal feet of land shall be considered one and the same mineral pit.
Land which has been restored in accordance with Section 7.C.9 of the Orrington Mineral Extraction
Ordinance will no longer be considered as part of the mineral pit.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-14
Mineral Pit Owner - Mineral pit owner shall mean the owner of the land where the mineral is excavated,
processed or stored. The responsibility to ensure restoration of the mineral pit shall be the obligation of
the mineral pit owner.
Mineral Pit Restoration - The term means the stabilization of inactive borrow areas with herbaceous
perennial plants.
Discontinued Mineral Pit - Discontinued mineral pit shall mean pit from which less than 200 cubic
yards have been removed within twelve (12) consecutive months.
Minimum lot width - The closest distance between the side lot lines of a lot at the front building line
(See Lot Width). When only two lot lines extend into the shoreland district, both lot lines shall be
considered to be side lot lines. See applicable tables 2-2 or 3-2 for dimension requirements.
Minor development (for floodplain management purposes) - All development that is not new
construction or a substantial improvement, such as repairs, maintenance, renovations, or additions,
whose value is less than 50% of the market value of the structure. It also includes, but is not limited to:
accessory structures as provided for in Article 7 Section 6.L., mining, dredging, filling, grading, paving,
excavation, drilling operations, storage of equipment or materials, deposition or extraction of materials,
public or private sewage disposal systems or water supply facilities that do not involve structures; and
non-structural projects such as bridges, dams, towers, fencing, pipelines, wharves, and piers.
Mobile home - As defined by and in compliance with MRSA Title 30-A, Section 4358.
Mobile home park - Land upon which two or mobile homes are located for living purposes.
Modular housing - As defined by and in compliance with MRSA Title 30-A, Section 4358.
Multi-family/Multi-unit residential - Two or more Accessory dwelling units.
Native: Indigenous to the local forests.
National Geodetic Vertical Datum (NGVD) - The national vertical datum, whose standard was
established in 1929, which is used by the National Flood Insurance Program (NFIP). NGVD was based
upon mean sea level in 1929 and also has been called "1929 Mean Sea Level (MSL)".
North American Vertical Datum (NAVD) (for floodplain management purposes) - the national
datum whose standard was established in 1988, which is the new vertical datum used by the National
flood Insurance Program (NFIP) for all new Flood Insurance Rate Maps. NAVD is based upon other
vertical data used by other countries such as Canada and Mexico and was established to replace NGVD
because of constant movement of the earth's crust, glacial rebound and subsidence and the increasing
use of satellite technology.
Natural Beauty - of, existing in, or produced by nature, not affected by man or civilization, possessing
the quality that gives pleasure to the mind or senses and is associated with such properties as harmony
of form or color or uniqueness.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-15
New construction - Structures for which the "start of construction" commenced on or after the effective
date of floodplain management regulations adopted by a community and includes any subsequent
improvements to such structures.
Non-conforming condition: Non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - A single lot of record which, at the effective date if adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located. Non-conforming structure - A structure which does not meet one or more of the following
dimensional requirements; setback, height, or lot coverage, but which is allowed solely because it was
in lawful existence at the time this Ordinance or subsequent amendments took effect. See: Increase in
nonconformity of a structure.
Non-conforming use - The use of buildings, structures, premises, or land thereof which is not allowed
in the district in which it is situated, but which is allowed to remain solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
Normal high-water line (non-tidal waters) - That line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric soils
and that are at the same or lower elevation as the water level of the river or great pond during the
period of normal high-water are considered part of the river or great pond.
NOTE: Adjacent to tidal waters, setbacks are measured from the upland edge of the "coastal
wetland."
Nuisances - A use of property or course of conduct that interferes with the legal rights of others by
causing damage, annoyance, or inconvenience. Any violation of this Ordinance shall be deemed to be
a nuisance.
Nursing home - Any dwelling in which 3 or more aged, chronically ill or incurable persons are housed
and furnished with meals and nursing care for compensation.
One-hundred-year flood (100-year flood) (for floodplain management purposes) - See Base Flood
Open Space - Undeveloped land that is protected by legislation and approved by State guidelines.
Outdoor advertising sign - A sign which directs attention to a business, product, activity, or service
which is not conducted, sold or offered on the premises where such sign is located.
Outdoor storage business - A commercial operation for the keeping, in an unenclosed area, of goods,
junk, material, merchandise or vehicles in the same place for more than twenty-four hours.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-16
Person - An individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharfs, bridges and other structures and uses extending over or beyond the normal high-
water line or within a wetland-
Temporary: Structures which remain in or over the water for less than seven (7) months in any
period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or more in any
period of twelve (12) consecutive months.
Premises - A tract of land with buildings thereon.
Primary Dwelling - A primary dwelling is the principal structure on a residential lot. It is typically a
single family, duplex, mobile home, or multi-family structure. The primary dwelling is distinguished
from an Accessory Dwelling as it is the primary use of the parcel and can be conveyed.
Principal structure - A building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same premise.
Principal use - A use other than one which is wholly incidental or accessory to another use on the same
premises.
Printing Facility - The mass reproduction of text and images using a master form or template.
Private road - A road serving more than two (2) dwellings, which has not been accepted by the Town
of Orrington as a public road. Lots with 2 or more dwellings will require road names.
Processing facility - An establishment that prepares, treats, or converts tangible personal property into
finished goods or another form of tangible personal property. The term includes a business engaged in
processing agricultural, aquacultural, or maricultural products and specifically includes meat, poultry,
and any other variety of food processing operations. It does not include an establishment in which
retail sales of tangible personal property are made to retail customers.
Production facility - A facility engaged in industrial-scale, large-volume or high concentration
production.
Professional/Business Office Building - A building or premises or part thereof whose sole or principal
use is for an office or for office purposes or clerical work, "Office purposes" includes the purpose of
administration, clerical work, handling money, telephone, computer operation and "clerical work"
includes writing, book-keeping, sorting papers, typing, filing, machine calculations, drawing of matter
for publication and editing etc.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-17
Public facility - Any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body, public entity
or chartered for public use.
Public road - A road which has been duly accepted by the Town of Orrington or is a road that has been
regularly maintained by the Town or the State of Maine.
Real estate sign - A sign pertaining to the lease, rental, or sale of the building or lot upon which it is
located.
Rear yard - Space on the same lot with a principal building, unoccupied except by accessory buildings
or uses, extending the full width of the lot and located between the rear line of the lot and the rear line
of the building projected to the side lines of the lot.
Recent floodplain soils - The following soil series as described and identified by the National
Cooperative Soil Survey:
Alluvial
Cornish
Charles
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - A place designed and equipped for the conduct of sports, leisure time activities,
and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - A vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up camper,
travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle and not
as a structure, the unit must remain with its tires on the ground, and must be registered with the State
Division of Motor Vehicles.
Recreational vehicle (for floodplain management purposes) - A vehicle which is:
1.)
built on a single chassis;
2.)
400 square feet or less when measured at the largest horizontal projection, not including slide
outs;
3.)
designed to be self-propelled or permanently towable by a motor vehicle; and
4.)
designed primarily not for use as a permanent dwelling but as temporary living quarters for
recreational, camping, travel, or seasonal use.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-18
Regulatory floodway (for floodplain management purposes)-
1.)
The channel of a river or other water course and the adjacent land areas that must be reserved in
order to discharge the base flood without cumulatively increasing the water surface elevation
more than a designated height, and
2.)
when not designated on the community's Flood Insurance Rate Map, it is considered to be the
channel of a river or other water course and the adjacent land areas to a distance of one-half the
width of the floodplain, as measured from the normal high water mark to the upland limit of the
floodplain.
Replacement system - A system intended to replace:
1.)
an existing system which is either malfunctioning or being upgraded with no significant change
of design flow or use of the structure, or
2.)
any existing overboard wastewater discharge.
Research and Development - Processes by which new products and new forms of old products are
brought into being through technological innovation.
Residual basal area - The average of the basal area of trees remaining on a harvested site.
Retail Outlet - One or more retail businesses, so regulated, incorporated, permitted, or licensed by the
State or Municipality, operating out of one building.
Riprap - Rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and
soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or
less.
River - A free-flowing body of water including its associated floodplain wetlands from that point at
which it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Riverine (for floodplain management purposes)- Relating to, formed by, or resembling a river
(including tributaries), stream, brook, etc.
NOTE: The portion of a river that is subject to tidal action is a coastal wetland.
Road - A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a driveway
as defined.
Roadside produce stand - A booth or stall from which produce and farm products are sold to the general
public.
Roadway - A commonly traveled way.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-19
Seasonal residence - A residential structure used primarily as a recreational home and inhabited
continuously for less than 6 months of the year (also "camp" or "cottage").
Service drop - Any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1.)
in the case of electric service:
a.
the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b.
the total length of the extension is less than one thousand (1,000) feet.
2.)
in the case of telephone service:
a.
the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b.
the extension requiring the installation of new utility poles or placement underground is
less than one thousand (1,000) feet in length.
Setback - The nearest horizontal distance from the normal high-water line of a water body or tributary
stream, or upland edge of a wetland, property boundary line, road, street line, to the nearest part of a
structure, parking space or other regulated object or area.
Shopping Center - A group of commercial establishments planned, constructed and managed as a total
entity, each business with its own separate entrance, with customer and employee parking provided on-
site, provisions for goods delivery separated from customer access, aesthetic considerations and
protection from the elements.
Shore frontage - The length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline.
Shoreland District - The land area located within two hundred and fifty (250) feet, horizontal distance,
of the normal high-water line of any great pond, or river, within 250 feet horizontal distance, of the
upland edge of a coastal wetland, including all areas affected by tidal action; within 250 feet of the
upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal
high-water line of a stream.
Shoreline - The normal high-water line, or upland edge of a freshwater or coastal wetland.
Side yard - Space on the same lot with a principle building, unoccupied except by accessory buildings
or uses, between the side of the building and the side line of the lot and extended form the front of the
building to the rear line of the building. The depth of the side yard is the distance between the side line
of the building and the side line of the lot.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-20
Sign - An attached or free-standing structure used for bringing the subject matter thereon to the attention
of the public.
Single-family dwelling - A free standing building on a permanent foundation serving as a dwelling unit
not including mobile homes.
Skid Road or Skid Trail - A route repeatedly used by forwarding machinery or animal to haul or drag
forest products from the stump to the yard or landing, the construction of which requires minimal
excavation.
Slash - The residue, e.g., treetops and branches, left on the ground after a timber harvest.
Special flood hazard area (for floodplain management purposes)- See Area of Special Flood Hazard.
Start of construction - The date the building permit was issued, provided the actual start of construction,
repair, reconstruction, rehabilitation, addition, placement, substantial improvement or other
improvement was within 180 days of the permit date. The actual start means either the first placement
of permanent construction of a structure on a site, such as the pouring of a slab or footings, the installation
of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a
manufactured home on a foundation. Permanent construction does not include land preparation, such as
clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it
include excavation for basement, footings, piers, or foundations or the erection of temporary forms, nor
does it include the installation on the property of accessory buildings, such as garages or sheds not
occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual
start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a
building, or modification of any construction element, whether or not that alteration affects the external
dimensions of the building.
Storage Facility (Commercial/Industrial) - A building or structure used for storing raw materials, and
other materials, equipment, and manufactured products.
Stream - A free-flowing body of water from the outlet of a great pond or to the point where the body of
water becomes a river or flows to another water body or wetland within the shoreland area. Additionally
the following are identified as streams or brooks worthy of protection:
1.)
So-called Baker Brook from the point of confluence of two intermittent streams
that form a brook to Brewer Lake.
2.)
Swetts Pond Brook and Mill Creek from Swetts Pond to the Penobscot River and
the north and south branches of said brook system from their respectful wetland
headwaters.
3.)
Trout Pond outlet.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-21
4.)
Other unnamed streams or brooks that are shaded as Stream Protection District on
the official Town of Orrington Land Use District Map.
Street line - The line along the edge of the surveyed right-of-way line closest to the property in question.
In those cases where the roadway does not fall within the surveyed right-of-way width, the street line
shall be determined as one-half the right-of-way width as measured from the center of the traveled
roadway. In no instance shall the street line fall inside the surveyed right-of-way.
Structure - Anything built for the support, shelter or enclosure of persons, animals, goods or property
of any kind, together with anything constructed or erected with a fixed location on or in the ground,
exclusive of fences, stairs, ramps, wiring and other aerial equipment normally associated with service
drops as well as guying and guy anchors, except that within the shoreland district, stairs and ramps are
considered structures. The term includes permanently located appurtenances, such as decks, patios,
towers, and windmills, and in the shoreland district includes structures that are temporary located. A
non-residential gas or liquid storage tank that is principally above ground is also a structure.
Structure (for floodplain management purposes) - a walled and roofed building. A gas or liquid
storage tank that is principally above ground is also a structure.
Subdivision - The division of a tract or parcel of land into 3 or more lots within a five-year period,
whether accomplished by sale, lease, development, building or otherwise, as provided in MRSA Title
30-A, Sections 4401-4407.
Substantial damage - Damage of any origin sustained by a structure whereby the cost of restoring the
structure to its before damage condition would equal or exceed 50 percent of the market value of the
structure before the damage occurred.
Substantial improvement - Any reconstruction, rehabilitation, addition, or other improvement of a
structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the
start of construction of the improvement. This term includes structures which have incurred substantial
damage, regardless of the actual repair work performed. The term does not, however, include either:
1.)
Any project for improvement of a structure to correct existing violations of state or local health,
sanitary, or safety code specifications which have been identified by the local code enforcement
official and which are the minimum necessary to assure safe living conditions; or
2.)
Any alteration of a historic structure, provided that the alteration will not preclude the structure's
continued designation as a historic structure, and a variance is obtained from the community's
Board of Appeals.
Substantial start - Completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface wastewater disposal system - Any system designed to dispose of waste or waste water on
or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-22
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal
sewer or waste water treatment system.
Supply Facility - Operating units (such as factories), storage facilities (such as warehouses), processing
centers, distribution centers, and offices where information is manipulated to trigger, move, and track
products and services within and throughout the supply chain.
Sustained slope - A change in elevation where the referenced percent grade is substantially maintained
or exceeded throughout the measured area.
Swimming pool - Any water holding structure above ground or in the ground with a capacity in excess
of 2,000 gallons designed in such a way as to be used for swimming, wading, etc.
Temporary - A time period not to exceed ninety (90) calendar days (unless otherwise explicitly
specified herein).
Terminal Facility - A facility used for cargo storage and/or loading and unloading cargo on a regular
basis.
Tidal waters - All waters affected by tidal action during the highest annual tide.
Timber harvesting - The cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the shoreland district on a lot that has
less than two (2) acres within the shoreland district shall not be considered timber harvesting. Such
cutting or removal of trees shall be regulated Article 3 Section F, Clearing or Removal of Vegetation
for Activities Other Than Timber Harvesting.
Transport vehicle - Any truck, tractor-trailer or truck-trailer combination, bus, van, coach, or other
wheeled or tracked vehicle normally used for carrying, transporting, or moving people, cargo or other
materials not within the same lot or parcel.
Transportation Facility - A commercial facility used for the transportation of persons or goods,
together with buildings, structures, and parking areas, appurtenances, and other property needed to
operate such a facility.
Travel trailer - A portable structure which can be moved on its own wheels, designed as a temporary
living place for travel, vacation and recreational use. In no case shall a travel trailer or camper be used
as a mobile home.
Travel trailer park - Land on which two or more travel trailers are parked or tents erected for temporary
family recreational use on sites arranged specifically for that purpose. The words "travel trailer park"
shall include "camping grounds" and "tenting grounds."
Tributary stream - A channel between defined banks created by the action of surface water, whether
intermittent or perennial, and which is characterized by the lack of upland vegetation or presence of
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-23
aquatic vegetation and by the presence of a bed devoid of topsoil containing waterborne deposits or
exposed soil, parent material or bedrock, and which is connected hydrologically with other water
bodies. "Tributary stream" does not include rills or gullies forming because of accelerated erosion in
disturbed soils where the natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only
applies to that portion of the tributary stream located within the shoreland district of the receiving water
body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland district.
Upland edge of a wetland- The boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or
the highest annual tide level, including all areas affected by tidal action. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation.
Utilities - A commodity or service, such as electricity, water, or public transportation, that is provided
by a municipal or private utility entity.
Variance - A relaxation of the provisions of this Ordinance in cases where literal enforcement would
result in practical difficulties or unnecessary hardships inconsistent with the general purpose and intent
of the Ordinance. Variances may be permitted only under all of the conditions set forth in Article 8,
Section 4.D.
Variance (for floodplain management purposes) - a grant of relief by a community from the terms of
a floodplain management regulation.
Vegetation - All live trees, shrubs, and other plants including without limitation, trees both over and
under 4 inches in diameter, measured at 4 ½ feet above ground level.
Veterinary hospital or clinic - A place used for the care, diagnosis, and treatment of sick, ailing, infirm,
or injured animals and may include overnight accommodations on the premises for treatment,
observation, and or recuperation. It may also include boarding that is incidental to the principal activity
or use.
Violation - The failure of a structure, use or development to comply with a community's ordinances
including floodplain management regulations.
Volume of a structure - The volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Warehouse - A structure or room for the storage, deposit, or stocking of merchandise or commodities.
Water body - Any great pond, river or stream.
June 6, 2005, rev. June 6, 2011, June 3, 2013, June 1, 2015, June 6, 2016, July 27, 2020, June 6, 2022, June 5, 2023,
June 3, 2024
Definitions
9-24
Water crossing - Any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water wetland. Such projects include
but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as
maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - See Coastal wetland and Freshwater wetland.
Wholesale Distribution - Establishments engaged in selling merchandise to retailers, to industrial,
commercial, institutional, or professional business users or to other wholesalers.
Woody Vegetation - Live trees or woody, non-herbaceous shrubs.
Yard sale - Includes so-called garage sales, porch sales, tag sales, and the like.