This is the exact embedded text of the captured official document.
Snapshot d9385ca43f7b · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
SHORELAND ZONING ORDINANCE
For the Town of Otisfield, Maine
Effective Date: March 2, 1991
Adopted: June 27, 2009
Amended: June 25, 2011
Amended: June 25, 2016
Attested: A True Copy; ______________________
Sharon A. Matthews, Clerk
1
2
TABLE OF CONTENTS
1. Purposes ................................................................................................................................................3
2. Authority ...............................................................................................................................................3
3. Applicability .........................................................................................................................................3
4. Effective Date of Ordinance and Ordinance Amendments ..................................................................3
5. Availability ...........................................................................................................................................3
6. Severability ...........................................................................................................................................3
7. Conflicts with Other Ordinances ..........................................................................................................3
8. Amendments .........................................................................................................................................3
9. Districts and Zoning Map .....................................................................................................................4
A. Official Shoreland Zoning Map(s) ......................................................................................4
B. Scale of Map(s) ....................................................................................................................4
C. Certification of Official Shoreland Zoning Map(s) .............................................................4
D. Changes to the Official Shoreland Zoning Map(s) ..............................................................4
10. Interpretation of District Boundaries ..................................................................................................4
11. Land Use Requirements ......................................................................................................................4
12. Non-conformance ................................................................................................................................4
A. Purpose .................................................................................................................................4
B. General ..................................................................................................................................5
C. Non-conforming Structures ...................................................................................................5
D. Non-conforming Uses ...........................................................................................................7
E. Non-conforming Lots.............................................................................................................8
13. Establishment of Districts ....................................................................................................................8
A. Resource Protection District .................................................................................................8
B. General Development District ..............................................................................................9
C. Limited Residential District .................................................................................................10
D. Stream Protection District ....................................................................................................10
14. Table of Land Uses .............................................................................................................................10
15. Land Use Standards ............................................................................................................................12
A. Minimum Lot Standards ......................................................................................................12
B. Principal and Accessory Structures .....................................................................................13
C. Deleted 6-25-16 and left blank
D. Campgrounds .......................................................................................................................15
E. Individual Private Campsites ...............................................................................................15
F. Commercial and Industrial Uses ..........................................................................................16
G. Parking Areas ......................................................................................................................16
H. Roads and Driveways ..........................................................................................................16
I. Signs ......................................................................................................................................18
J. Storm Water Runoff ..............................................................................................................19
K. Septic Waste Disposal..........................................................................................................19
L. Essential Services.................................................................................................................19
M. Mineral Exploration and Extraction ...................................................................................20
N. Agriculture ..........................................................................................................................21
O. Timber Harvesting - Statewide Standards ..........................................................................21
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting ...........22
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal..............................24
R Exemptions to Clearing and Vegetation Removal Requirements..............................25
S. Revegetation Requirements.........................................................................26
T. Erosion and Sedimentation Control ....................................................................................27
U. Soils.....................................................................................................................................28
V. Water Quality .....................................................................................................................28
W. Archaeological Site ...........................................................................................................28
16. Administration ...................................................................................................................................29
A. Administering Bodies and Agents ......................................................................................29
B. Permits Required .................................................................................................................29
C. Permit Application ..............................................................................................................29
D. Procedure for Administering Permits .................................................................................30
E. Special Exceptions ..............................................................................................................31
F. Expiration of Permit ............................................................................................................31
G. Installation of Public Utility Service...................................................................................31
H. Appeals ...............................................................................................................................32
I. Enforcement .........................................................................................................................35
17. Definitions .........................................................................................................................................35
3
Shoreland Zoning Ordinance
Otisfield, Maine
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life,
bird and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion;
to protect archaeological and historic resources; to protect freshwater wetlands; to control building
sites, placement of structures and land uses; to conserve shore cover, and visual as well as actual
points of access to inland waters; to conserve natural beauty and open space; and to anticipate and
respond to the impacts of development in shoreland areas
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
normal high-water line of any great pond or river, within 250 feet, horizontal distance, of the upland
edge of a freshwater wetlands; rated moderate or high value by the Maine Department of Inland
Fisheries and Wildlife; within 75 feet, horizontal distance, of the upland edge of a fresh water
wetland rate low value or not rated by the Maine Department of Inland Fisheries and Wildlife; and
within 75 feet, horizontal distance, of the normal high-water line of a stream and outlet stream.
4. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was adopted
by the municipal legislative body on March 2, 1991, shall not be effective unless approved by the
Commissioner of the Department of Environmental Protection. A certified copy of the Ordinance,
or Ordinance Amendment, attested and signed by the Municipal Clerk, shall be forwarded to the
Commissioner for approval. If the Commissioner fails to act on this Ordinance or Ordinance
Amendment, within forty-five (45) days of his/her receipt of the Ordinance, or Ordinance
Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period shall
be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall
be posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of
the Department of Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
4
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map(s). The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Otisfield Shoreland Zoning Map(s)
which is (are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) General Development
(4) Stream Protection
B. Scale of Map(s). The Official Shoreland Zoning Map(s) shall be drawn at a scale of not less
than: 1 inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating
the symbols for each district shall be placed on the map(s).
C. Certification of Official Shoreland Zoning Map(s). The Official Shoreland Zoning Map(s)
shall be certified by the attested signature of the Municipal Clerk and shall be located in the
municipal office.
D. Changes to the Official Shoreland Zoning Map(s). If amendments, in accordance with
Section 8, are made in the district boundaries or other matter portrayed on the Official Shoreland
Zoning Map(s), such changes shall be made on the Official Shoreland Zoning Map(s) within
thirty (30) days after the amendment has been approved by the Commissioner of the Department
of Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland Zoning
Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way,
and the boundaries of the shoreland defined herein. Where uncertainty exists as to the exact location
of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with
all of the regulations herein specified for the district in which it is located, unless a variance is
granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except
as otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
5
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and the
new owner may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do
not involve expansion of the non-conforming use or structure, and such other changes in a
non-conforming use or structure as federal, state, or local building and safety codes may
require.
C. Non-conforming Structures
(1) Expansions. A non-conforming structure may be added to or expanded after obtaining a
permit from the same permitting authority as that for a new structure, if such addition or
expansion does not increase the non-conformity of the structure and is in accordance with
subparagraph (a) below.
(a) Legally existing non-conforming principal and accessory structures that do not meet the
water body, tributary stream, or wetland setback requirements may be expanded or
altered as follows, as long as all other applicable standards contained in this Ordinance
are met.
i
Expansion of that portion of a structure within 25 feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a
wetland is prohibited, even if the expansion will not increase nonconformity with
the water body, tributary stream or wetland setback requirement.
ii.
Expansion of an accessory structure that is located closer to the normal high-water
line of a water body, tributary stream, or upland edge of a wetland than the
principal structure is prohibited, even if the expansion will not increase
nonconformity with the water body or wetland setback requirement.
iii.
For structures located less than 75 feet, horizontal distance, from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland, the
maximum combined total footprint for all portions of those structures within that
75-foot distance is 1,000 square feet, and the maximum height of any portion of a
structure that is within 75 feet, horizontal distance, of a water body, tributary
stream or upland edge of a wetland is 20 feet or the height of the existing
structure, whichever is greater.
iv.
For structures located less than 100 feet, horizontal distance, from the normal
high-water line of a great pond classified as GPA or a river flowing to a great
pond classified as GPA, the maximum combined total footprint for all portions of
those structures within that 100-foot distance is 1,500 square feet, and the
maximum height of any portion of a structure that is within 100 feet, horizontal
distance, of a great pond is 25 feet or the height of the existing structure,
whichever is greater, except that any portion of those structures located less than
75 feet, horizontal distance from the normal high-water line of a water body,
tributary stream, or the upland edge of a wetland must meet the footprint and
height limits of division (iii).
6
For the purposes of Section 12(C)(1)(a), a basement is not counted toward floor
area.
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed under a
non-conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(3)
Relocation, below.
(3) Relocation. A non-conforming structure may be relocated within the boundaries of the
parcel on which the structure is located provided that the site of relocation conforms to all
setback requirements to the greatest practical extent as determined by the Planning Board or
its designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation in accordance with Section 15(S). In addition, the area
from which the relocated structure was removed must be replanted with vegetation.
Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted,
no one species of tree shall make up more than 50% of the number of trees planted.
Replaced trees must be planted no further from the water or wetland than the trees that
were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged, or
removed must be reestablished within the setback area. The vegetation and/or ground
cover must consist of similar native vegetation and/or ground cover that was disturbed,
destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or
a combination thereof.
(4) Reconstruction or Replacement. Any non-conforming structure which is located less than the
required setback from a water body, tributary stream, or wetland and which is removed, or
damaged or destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or replaced
7
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in compliance
with the water body, tributary stream or wetland setback requirement to the greatest practical
extent as determined by the Planning Board or its designee in accordance with the purposes of
this Ordinance. In no case shall a structure be reconstructed or replaced so as to increase its
non-conformity. If the reconstructed or replacement structure is less than the required setback it
shall not be any larger than the original structure, except as allowed pursuant to Section
12(C)(1) above, as determined by the non-conforming footprint of the reconstructed or replaced
structure at its new location. If the total amount of footprint of the original structure can be
relocated or reconstructed beyond the required setback area, no portion of the relocated or
reconstructed structure shall be replaced or constructed at less than the setback requirement for
a new structure. When it is necessary to remove vegetation in order to replace or reconstruct a
structure, vegetation shall be replanted in accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market value, or
damaged or destroyed by 50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(3) above, the physical condition and type of foundation present, if any.
(5) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may
not be changed to another use unless the Planning Board, after receiving a written application,
determines that the new use will have no greater adverse impact on the water body, tributary
stream, or wetland, or on the subject or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover,
visual and actual points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources, and functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that the
structure has been used or maintained for residential purposes during the preceding five (5)
year period.
8
(3) Change of Use. An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the subject
and adjacent properties and resources than the former use, as determined by the Planning
Board. The determination of no greater adverse impact shall be made according to criteria
listed in Section 12(C)(5) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure exists
on each lot, the non-conforming lots may be conveyed separately or together, provided that
the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the
State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are
in single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective date of this Ordinance and
recorded in the registry of deeds if the lot is served by a public sewer or can accommodate a
subsurface sewage disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
9
the limits of the shoreland zone, exclusive of the Stream Protection District, except that areas
which are currently developed and areas which meet the criteria for the General Development
District need not be included within the Resource Protection District.
10
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands and
wetlands associated with great ponds and rivers, which are rated "moderate" or "high" value
waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic
Information System (GIS) data layer maintained by MDIF&W as of December 31, 2008 and
areas within 75 feet, horizontal distance, of the upland edge of freshwater wetlands, rated low
or not rated by the Maine Department of Inland Fisheries and Wildlife as of December 31,
2008. For the purposes of this paragraph "wetlands associated with great ponds and rivers"
shall mean areas characterized by non-forested wetland vegetation and hydric soils that are
contiguous with a great pond or river, and have a surface elevation at or below the water
level of the great pond or river during the period of normal high water. "Wetlands associated
with great ponds or rivers" are considered to be part of that great pond or river.
(2) Floodplains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the 100 year floodplain as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps (FHBM), or
the flood of record, or in the absence of these, by soil types identified as recent floodplain
soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially connected
to a water body during the period of normal high water.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement.
(6) Other important wildlife habitat;
(7) Natural sites of significant scenic or esthetic value;
(8) Areas designated by federal, state or municipal governments as natural areas of
significance to be protected from development; and
(9) Other significant areas which should be included in this district to fulfill the purposes
of this Ordinance, such as, but not limited to, existing public access areas and certain
significant archaeological and historic sites deserving of long-term protection as determined
by the municipality after consultation with the Maine Historic Preservation Commission.
B. General Development District. The General Development District includes the following types
of existing, intensively developed areas:
(1) Areas of two or more contiguous acres devoted to commercial, industrial or intensive
recreational activities, or a mix of such activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade and service activities, or other
commercial activities; and
(c) Areas devoted to intensive recreational development and activities, such as, but not
limited to amusement parks, race tracks and fairgrounds.
(2) Areas otherwise discernible as having patterns of intensive commercial, industrial or
recreational uses.
(3) Also included are lots 35, 37, and 39 on Property Map U2.
11
C. Limited Residential District. The Limited Residential District includes those areas suitable for
residential and recreational development. It includes areas other than those in the Resource
Protection District, or Stream Protection District, and areas which are used less intensively than
those in the General Development District and any applicable areas not in the other three (3)
districts.
D. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream or outlet
stream, exclusive of those areas within two-hundred and fifty (250) feet, horizontal distance, of
the normal high-water line of a great pond, or river, or within two hundred and fifty (250) feet,
horizontal distance, of the upland edge of a wetland. Where a stream or outlet stream and its
associated shoreland area are located within two-hundred and fifty (250) feet, horizontal
distance, of the above water bodies or wetlands, that land area shall be regulated under the terms
of the shoreland district associated with that water body or wetland.
14. Table of Land Uses
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform with
all of the applicable land use standards in Section 15. The district designation for a particular site
shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land use
standards)
No - Prohibited
PB - Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
* -
Subject to specific Land Use Standards, Section 15
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -
Resource Protection
BOA- Board of Appeals
GD - General Development
PB - Planning Board
LR -
Limited Residential
CEO - Code Enforcement Officer
SP -
Stream Protection
LPI - Local Plumbing Inspector
BoF- Bureau of Forestry
DEP - Department of Environmental Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICT
SP
RP LR
GD
1. Non-intensive recreational uses not requiring structures
such as
hunting, fishing and hiking
yes
yes
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
3. Forest management activities except for timber harvesting
& land management roads
BoF
BoF
BoF
BoF
4. Timber harvesting
BoF
BoF
BoF
BoF
5. Clearing or removal of vegetation for activities other than
timber harvesting
CEO
CEO
1
CEO
CEO
6. Fire prevention activities
yes
yes
yes
yes
7. Wildlife management practices
yes
yes
yes
yes
12
8. Soil and water conservation practices
yes
yes
yes
yes
9. Mineral exploration
no
yes
2
yes
2
yes
2
10. Mineral extraction including sand and gravel extraction
no
PB
3
PB
PB
11. Surveying and resource analysis
yes
yes
yes
yes
12. Emergency operations
yes
yes
yes
yes
13. Deleted 6-25-16 and left blank
14. Agriculture
yes
PB
yes
yes
15. Aquaculture
PB
PB
PB
yes
16. Principal structures and uses
A. One and two family residential, including driveways
PB
4
PB
9
CEO
CEO
B. Multi-unit residential
no
no
PB
PB
C. Commercial
no
no
10
no
10
PB
D. Industrial
no
no
no
PB
E. Governmental and institutional
no
no
PB
PB
SP
RP
LR
GD
F. Small non-residential facilities for educational,
scientific, or nature interpretation purposes
PB
4
PB
CEO
CEO
17. Structures accessory to allowed uses
PB
4
PB
CEO
yes
18. Deleted 6-25-16 and left blank
19. Conversions of seasonal residences to year-round
residences
LPI
LPI
LPI
LPI
20. Home occupations
PB
PB
PB
Yes
21. Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
22. Deleted 6-25-16 and left blank
23. Essential services
PB
6
PB
6
PB
PB
A. Roadside distribution lines (34.5kV and lower)
CEO6
CEO6
yes12
yes12
B. Non-roadside or cross-country distribution lines
involving ten poles or less in the shoreland zone
PB6
PB6
CEO
CEO
C. Non-roadside or cross-country distribution lines
involving eleven or more poles in the shoreland zone
PB6
PB6
PB
PB
D. Other essential services
PB6
PB6
PB
PB
24. Service drops, as defined, to allowed uses
yes
yes
yes
yes
25. Public and private recreational areas involving minimal
structural development
PB
PB
PB
CEO
26. Individual, private campsites
CEO
CEO
CEO
CEO
27. Campgrounds
no
no
7
PB
PB
28. Road construction
PB
no
8
PB
PB
29. Land management roads
BoF
BoF
BoF
BoF
30. Parking facilities
no
no
7
PB
PB
31. Marinas
PB
no
PB
PB
32. Filling and earth moving of <10 cubic yards
CEO
CEO
yes
Yes
33. Filling and earth moving of >10 cubic yards
PB
PB
CEO
CEO
34. Signs
yes
yes
yes
Yes
35. Uses similar to allowed uses
CEO
CEO
CEO
CEO
36. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
37. Uses similar to uses requiring a PB permit
PB
PB
PB
PB
1Clearing or removal of vegetation for activities other than timber harvesting with 100 feet of the normal high-water
line of great ponds requires a permit from the CEO.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is
disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only (See note on previous page).
6See further restrictions in Section 15( L)(2).
13
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from
the PB.
8Except as provided in Section 15(H)(4).
9Single family residential structures may be allowed by special exception only according to the provisions of Section
16(E), Special Exceptions. Two-family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the
respective district.
11 Deleted 6-25-16 and left blank.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
15. Land Use Standards
All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1) (a) Residential per dwelling unit
43,560
200
(b) Governmental, Institutional, Commercial
or Industrial per principal structure
65,340
300
(c) Public and Private Recreational Facilities
43,560
200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and land
beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial or
industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
structure, or use.
(6) Each lot shall have a minimum of 200 feet of road frontage on a public or private right-
of-way.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental
Protection, pursuant to 38 M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater
wetland, great pond, river, stream or brook and operates in such a manner that material or soil may be washed into
them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D
Any construction or alteration of any permanent structure
14
15
B.
Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds and rivers that flow to great
ponds, and seventy-five (75) feet, horizontal distance, from the normal high-water line of other
water bodies, tributary streams, or the upland edge of a wetland, except that in the General
Development District the setback from the normal high-water line shall be at least twenty five
(25) feet, horizontal distance. In the Resource Protection District the setback requirement shall
be 250 feet, horizontal distance, except for structures, roads, parking spaces or other regulated
objects specifically allowed in that district in which case the setback requirements specified
above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
(b) On a non-conforming lot of record on which only a residential structure exists, and it is not
possible to place an accessory structure meeting the required water body, tributary stream
or wetland setbacks, the code enforcement officer may issue a permit to place a single
accessory structure, with no utilities, for the storage of yard tools and similar equipment.
Such accessory structure shall not exceed eighty (80) square feet in area nor eight (8) feet
in height, and shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall the structure be located closer to the shoreline or tributary
stream than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in
the Resource Protection, Limited Residential, and Stream Protection Districts, shall not exceed
thirty-five (35) feet in height. This provision shall not apply to structures such as transmission
towers, windmills, antennas, and similar structures having no floor area. Also exempt a cupola,
dome, widow's walk or other similar feature from the height limits in accordance with 38 M.R.S.A.
Section 439-A(9).
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of record,
or in the absence of these, the flood as defined by soil types identified as recent flood-plain
soils. In those municipalities that participate in the National Flood Insurance Program and
have adopted the April 2005 version, or later version, of the Floodplain Management
Ordinance, accessory structures may be placed in accordance with the standards of that
ordinance and need not meet the elevation requirements of this paragraph.
NOTE: Permitting under the Natural Resources Protection Act for activities adjacent to significant
wildlife habitat areas may require greater setbacks. Contact your local Department of Environmental
Protection office to see if additional permitting is required.
16
(4) The total footprint area of all structures, driveways, parking lots areas and other areas from
which vegetation has been removed, and any other non-vegetated surfaces, within the shoreland
zone shall not exceed twenty (20) percent of the lot or a portion of the lot, located within the
shoreland zone.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water line of
a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams,
wetlands, and tributary streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the
flood of record, or in the absence of these, by soil types identified as recent flood plain
soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation. Where
natural ground cover is lacking the area must be supplemented with leaf or bark
mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide for
effective infiltration of stormwater runoff;
(iii)Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the buffer;
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the Code Enforcement Officer, to provide shoreline access in areas of steep
slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet in
width; that the structure does not extend below or over the normal high-water line of a water
body or upland edge of a wetland, (unless permitted by the Department of Environmental
Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C); and
that the applicant demonstrates that no reasonable access alternative exists on the property.
C. Deleted 6-25-16 and left blank.
NOTE: A structure constructed on a float or floats is prohibited unless it is designed to function as, and is registered with the
Maine Department of Inland Fisheries and Wildlife as a watercraft.
17
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds
are allowed provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or forty thousand
(40,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
(2) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal high-
water line of a great pond river flowing to a great pond, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no structure
except a canopy shall be attached to the recreational vehicle.
(4) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1,000) square feet.
(5) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or land
owner is required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
(7) When an individual private campsite is proposed on a lot that contains another principal use
and/or structure, the lot must contain the minimum lot dimensional requirements for the
principal structure and/or use, and the individual private campsite separately.
NOTE: New permanent structures, and expansions thereof, projecting into or over water bodies shall require a permit
from the Department of Environmental Protection pursuant to the Natural Resources Protection Act, 38
M.R.S.A. section 480-C. Permits may also be required from the Army Corps of Engineers if located in
navigable waters.
18
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds, and rivers and streams which flow
to great ponds:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on same property as use
occurs and except for storage and sales associated with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities in Districts other than the General
Development District shall be no less than fifty (50) feet, horizontal distance, from the
shoreline or tributary stream if the Planning Board finds that no other reasonable alternative
exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and
where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except
that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond or a river that flows to a great pond, and
seventy-five (75) feet, horizontal distance from the normal high-water line of other water
bodies, tributary streams, or the upland edge of a wetland unless no reasonable alternative
exists as determined by the Planning Board. If no other reasonable alternative exists, the road
and/or driveway setback requirement shall be no less than fifty (50) feet, horizontal distance,
upon clear showing by the applicant that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may include,
but are not limited to, the installation of settling basins, and/or the effective use of additional
19
ditch relief culverts and turnouts placed so as to avoid sedimentation of the water body,
tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope above
twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways that
provide access to permitted structures and facilities located nearer to the shoreline or tributary
stream due to an operational necessity, excluding temporary docks for recreational uses. Roads
and driveways providing access to permitted structures within the setback area shall comply
fully with the requirements of Section 15(H)(1) except for that portion of the road or driveway
necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(Q).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
20
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular to
the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning and their inlet and outlet ends shall be stabilized with appropriate
materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I. Signs. The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, and Limited Residential Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such
signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. Signs relating to goods or services not sold or rendered on the premises shall be
prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and
shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
21
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following:
(a) Clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet,
horizontal distance, from the normal high-water line of a water body or the upland
edge of a wetland and;
(b) A holding tank is not allowed for a first-time residential use in the shoreland zone.
(c) New systems, excluding fill extensions, to be constructed no less than one hundred (100)
horizontal feet from the normal high-water line of a perennial
water body. The
minimum setback distance for a new subsurface disposal system may not be reduced
by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed in
a Resource Protection or Stream Protection District, except to provide services to a permitted
use within said district, or except where the applicant demonstrates that no reasonable
alternative exists. Where allowed, such structures and facilities shall be located so as to
minimize any adverse impacts on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
NOTE:
The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to be obtained from
the DEP prior to construction of a project consisting of 20,000 square feet or more of impervious area or 5
acres or more of a developed area in an urban impaired stream watershed or most-at-risk lake watershed, or
a project with 1 acre or more of developed area in any other stream, coastal or wetland watershed. A permit-
by rule is necessary for a project with one acre or more of disturbed area but less than 1 acre impervious
area (20,000 square feet for most-at-risk lakes and urban impaired streams) and less than 5 acres of
developed area. Furthermore, a Maine Construction General Permit is required if the construction will result
in one acre or more of disturbed area.
22
M. Mineral Exploration and Extraction.
Mineral exploration to determine the nature or extent of mineral resources shall be accomplished
by hand sampling, test boring, or other methods which create minimal disturbance of less than
one hundred (100) square feet of ground surface. A permit from the Code Enforcement Officer
shall be required for mineral exploration which exceeds the above limitation. All excavations,
including test pits and holes, shall be immediately capped, filled or secured by other equally
effective measures to restore disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(4) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet, horizontal distance, of the normal high-water line of
a great pond or a river flowing to a great pond, and within seventy-five (75) feet, horizontal
distance, of the normal high-water line of any other water body, tributary stream, or the
upland edge of a wetland. Extraction operations shall not be permitted within fifty (50) feet,
horizontal distance, of any property line without written permission of the owner of such
adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
23
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the Maine Department of Agriculture on November 1, 2001, and the
Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,
of a great pond or a river flowing to a great pond, or within seventy-five (75) feet horizontal
distance, of other water bodies, tributary streams, or wetlands. All manure storage areas
within the shoreland zone must be constructed or modified such that the facility produces no
discharge of effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of the
normal high-water line of a great pond; within seventy-five (75) feet, horizontal distance,
from other water bodies; nor within twenty-five (25) feet, horizontal distance, of tributary
streams and wetlands. Operations in existence on the effective date of this ordinance and not
in conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond; within seventy-five
(75) feet, horizontal distance, of other water bodies; nor within twenty-five (25) feet,
horizontal distance, of tributary streams and wetlands. Livestock grazing associated with
ongoing farm activities, and which are not in conformance with the above setback provisions
may continue, provided that such grazing is conducted in accordance with a Conservation
Plan.
O. Timber Harvesting
Bureau of Forestry within the Department of Agriculture, Conservation and Forestry shall administer and
enforce the statewide standards within Town of Otisfield beginning on January 1, 2013
24
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation
within the strip of land extending 75 feet, horizontal distance, inland from the normal high-
water line, except to remove hazard trees as described in section Q.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water line of a great
pond or a river flowing to a great pond, or within a strip extending seventy-five (75) feet,
horizontal distance, from any other water body, tributary stream, or the upland edge of a
wetland, a buffer strip of vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a single footpath not to exceed six (6)
feet in width as measured between tree trunks and/or shrub stems is allowed for accessing
the shoreline provided that a cleared line of sight to the water through the buffer strip is
not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a great pond or a river
or stream flowing to a great pond, shall be defined as maintaining a rating score of 24 or
more in each 25-foot by 50-foot rectangular (1250 square feet) area as determined by the
following rating system.
Diameter of Tree at 4-
1/2 feet Above Ground
Level (inches)
Points
2 - < 4 in.
1
4 - <8 in.
2
8-< 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner
or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii)Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to the
minimum points required or as otherwise allowed by this Ordinance;
25
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and the forest duff layer, shall
not be cut, covered, or removed, except to provide for a footpath or other permitted uses
as described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
dead or hazard trees results in the creation of cleared openings, these openings shall be
replanted with native tree species in accordance with Section Q, below, unless existing
new tree growth is present.
(f) In order to maintain the vegetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related equipment
operation, within or outside the shoreline buffer, must comply with the requirements of
Section 15(P)(2).
Section 15(P)(2) does not apply to those portions of public recreational facilities adjacent to
public swimming areas as long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond or a
river flowing to a great pond, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of any other water body, tributary stream, or the upland edge of a wetland,
there shall be allowed on any lot, in any ten (10) year period, selective cutting of not more
than forty (40) percent of the volume of trees four (4) inches or more in diameter, measured 4
1/2 feet above ground level. Tree removal in conjunction with the development of permitted
uses shall be included in the forty (40) percent calculation. For the purposes of these
standards volume may be considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone, including land previously cleared. This
provision applies to the portion of a lot within the shoreland zone, including the buffer area,
but shall not apply to the General Development Districts.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
26
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal.
(1) Hazard trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in
the tree canopy greater than two hundred and fifty (250) square feet, replacement with
native tree species is required, unless there is new tree growth already present. New tree
growth must be as near as practicable to where the hazard tree was removed and be at least
two (2) inches in diameter, measured at four and one half (4.5) feet above the ground level.
If new growth is not present, then replacement trees shall consist of native species and be
at least four (4) feet in height, and be no less than two (2) inches in diameter. Stumps may
not be removed.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four and
one half (4.5) feet above ground level in any ten (10) year period, and/or results in cleared
openings exceeding twenty-five (25) percent of the lot area within the shoreland zone, or
ten thousand (10,000) square feet, whichever is greater, replacement with native tree
species is required, unless there is new tree growth already present. New tree growth must
be as near as practicable to where the hazard tree was removed and be at least two (2)
inches in diameter, measured at four and one half (4.5) feet above the ground level. If new
growth is not present, then replacement trees shall consist of native species and be at least
two (2) inches in diameter, measured at four and one half (4.5) feet above the ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible without
the need for replanting or a permit, as long as the removal does not result in the creation of
new lawn areas, or other permanently cleared areas, and stumps are not removed. For the
purposes of this provision dead trees are those trees that contain no foliage during the
growing season.
(d) The Code Enforcement Officer may require the property owner to submit an evaluation
from a licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
(e) The Code Enforcement Officer may require more than a one-for-one replacement for
hazard trees removed that exceed eight (8) inches in diameter measured at four and one
half (4.5) feet above the ground level.
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared
opening in the tree canopy greater than two hundred and fifty (250) square feet, replanting
is not required, but the area shall be required to naturally revegetate, and the following
requirements must be met:
27
(i) The area from which a storm-damaged tree is removed does not result in new lawn
areas, or other permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed;
(iii) Limbs damaged from a storm event may be pruned even if they extend beyond the
bottom one-third (1/3) of the tree; and
(iv) If after one growing season, no natural regeneration or regrowth is present,
replanting of native tree seedlings or saplings is required at a density of one seedling
per every eighty (80) square feet of lost canopy.
(b)
Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of the
volume of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet
above the ground level in any ten (10) year period, or results, in the aggregate, in cleared
openings exceeding 25% of the lot area within the shoreland zone or ten thousand (10,000)
square feet, whichever is greater, and no natural regeneration occurs within one growing season,
then native tree seedlings or saplings shall be replanted on a one-for-one basis.
R.
Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in
Section 15(P), provided that all other applicable requirements of this chapter are complied with, and
the removal of vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the maintenance
of legally existing areas that do not comply with the vegetation standards in this chapter, such
as but not limited to cleared openings in the canopy or fields. Such areas shall not be
enlarged, except as allowed by this section. If any of these areas, due to lack of removal of
vegetation every two (2) years, reverts back to primarily woody vegetation, the requirements
of Section 15(P) apply;
(2) The removal of vegetation from the location of allowed structures or allowed uses, when the
shoreline setback requirements of section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of section 15(N) are
complied with;
(5) The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled
or tracked motorized equipment is operated and stored at least twenty-five (25) feet,
horizontal distance, from the shoreline, except that wheeled or tracked equipment may be
operated or stored on existing structural surfaces, such as pavement or gravel;
28
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the
shoreline occurs via hand tools; and
(c) If applicable clearing and vegetation removal standards are exceeded due to the removal
of non-native invasive species vegetation, the area shall be revegetated with native
species to achieve compliance.
(6) The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and their agents.
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in Section 15(P),
to address the removal of non- native invasive species of vegetation, or as a mechanism to allow for
development that may otherwise not be permissible due to the vegetation standards, including removal of
vegetation in conjunction with a shoreline stabilization project, the revegetation must comply with the
following requirements.
(1) The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include a scaled
site plan, depicting where vegetation was, or is to be removed, where existing vegetation is to remain,
and where vegetation is to be planted, including a list of all vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area where vegetation
was removed and at a density comparable to the pre-existing vegetation, except where a shoreline
stabilization activity does not allow revegetation to occur in the same area and at a density
comparable to the pre-existing vegetation, in which case revegetation must occur along the same
segment of shoreline and as close as possible to the area where vegetation was removed.
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If the
activity or revegetation is not completed before the expiration of the permit, a new revegetation plan
shall be submitted with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must at a minimum consist of saplings;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different species shall be
used;
(d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to plant trees
and saplings in the same area where trees or saplings were removed, then trees or sapling must be
planted in a location that effectively reestablishes the screening between the shoreline and
structures; and
NOTE: An updated list of non-native invasive vegetation is maintained by the Department of Agriculture,
Conservation and Forestry's Natural Areas Program:
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
29
(f) A survival rate of at least eighty (80) percent of planted trees or saplings is required for a
minimum five (5) years period.
(5) Revegetation activities must meet the following requirements for woody vegetation and other
vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced with native
noninvasive species of woody vegetation and vegetation under three (3) feet in height as
applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in quantities and
variety sufficient to prevent erosion and provide for effective infiltration of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3) different
species shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody vegetation plants;
and
(e) Survival of planted woody vegetation and vegetation under three feet in height must be
sufficient to remain in compliance with the standards contained within this chapter for
minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and ground
cover:
(a) All ground vegetation and ground cover removed must be replaced with native herbaceous
vegetation, in quantities and variety sufficient to prevent erosion and provide for effective
infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, an area must be supplemented with a
minimum four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion and provide for
effective infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to remain in
compliance with the standards contained within this chapter for minimum of five (5) years.
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which
result in unstabilized soil conditions and which require a permit shall also require a written
soil erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
30
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of
the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in order
to carry water from a twenty five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
U. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on-site
investigation and be prepared by state-certified professionals. Certified persons may include
Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and evaluation
of soil properties. The report shall be based upon the analysis of the characteristics of the soil
and surrounding land and water areas, maximum ground water elevation, presence of ledge,
drainage conditions, and other pertinent data which the evaluator deems appropriate. The soils
report shall include recommendations for a proposed use to counteract soil limitations where
they exist.
V. Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
W. Archaeological Site
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as
determined by the permitting authority, shall be submitted by the applicant to the Maine Historic
Preservation Commission for review and comment, at least twenty (20) days prior to action
31
being taken by the permitting authority. The permitting authority shall consider comments
received from the Commission prior to rendering a decision on the application.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed
annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of
30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of
State law.
B. Permits Required
After the effective date of this Ordinance no person(s) shall, without first obtaining a permit,
engage in any activity or use of land or structure requiring a permit in the district in which such
activity or use would occur; or expand, change, or replace an existing use or structure; or renew a
discontinued nonconforming use. A person who is issued a permit pursuant to this Ordinance
shall have a copy of the permit on site while the work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that the
information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(4) A valid plumbing permit or a completed application for a plumbing permit, including the site
evaluation approved by the Plumbing Inspector, shall be submitted whenever the nature of
32
the proposed structure or use would require the installation of a subsurface sewage disposal
system.
(5) When an excavation contractor will perform an activity that requires or results in more than
one (1) cubic yard of soil disturbance, the person responsible for management of erosion and
sedimentation control practices at the site must be certified in erosion control practices by the
Maine Department of Environmental Protection. This person must be present at the site each
day earthmoving activity occurs for a duration that is sufficient to ensure that proper erosion
and sedimentation control practices are followed. This is required until erosion and
sedimentation control measures have been installed, which will either stay in place
permanently or stay in place until the area is sufficiently covered with vegetation necessary
to prevent soil erosion. The name and certification number of the person who will oversee
the activity causing or resulting in soil disturbance shall be included on the permit
application. This requirement does not apply to a person or firm engaged in agriculture or
timber harvesting if best management practices for erosion and sedimentation control are
used; and municipal, state and federal employees engaged in projects associated with that
employment.
D. Procedure for Administering Permits
Within 35 days of the date of receiving a written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that
the application is a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete. The Planning Board or the Code
Enforcement Officer, as appropriate, shall approve, approve with conditions, or deny all permit
applications in writing within 35 days of receiving a completed application. However, if the
Planning Board has a waiting list of applications, a decision on the application shall occur within
35 days after the first available date on the Planning Board's agenda following receipt of the
completed application, or within 35 days of the public hearing, if the proposed use or structure is
found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will avoid problems associated with floodplain development and use; and
(8) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
33
34
E. Special Exceptions
In addition to the criteria specified in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential structure
in a Resource Protection District provided that the applicant demonstrates that all of the
following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100-year flood-plain along rivers and artificially
formed great ponds along rivers, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements, are
elevated at least one foot above the 100-year flood-plain elevation; and the development
is otherwise in compliance with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the 100-year flood-plain.
(4) The total footprint, including cantilevered or similar overhanging extensions, of all principal
and accessory structures is limited to a maximum of 1,500 square feet. This limitation shall
not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than 75 feet, horizontal distance. In determining the greatest
practical extent, the Planning Board shall consider the depth of the lot, the slope of the land,
the potential for soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
F. Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made within
one year of the issuance of the permit, the applicant shall have one additional year to complete
the project, at which time the permit shall expire.
G. Installation of Public Utility Service
A public utility, water district, sanitary district or any utility company of any kind may not install
services to any new structure located in the shoreland zone unless written authorization attesting
to the validity and currency of all local permits required under this or any previous Ordinance
has been issued by the appropriate municipal officials or other written arrangements have been
made between the municipal officials and the utility.
35
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate
basis, where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision, or determination made by, or failure to act by, the Planning Board in
the administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code Enforcement
Officer in his or her review of and action on a permit application under this Ordinance.
Any order, requirement, decision or determination made, or failure to act, in the
enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in
this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(d)(ii) above, the Code Enforcement Officer may grant a
variance to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the dwelling. The
board shall restrict any variance granted under this subsection solely to the installation of
equipment or the construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to the time that
the person with the disability lives in the dwelling. The term "structures necessary for
access to or egress from the dwelling" shall include railing, wall or roof systems necessary
for the safety or effectiveness of the structure. Any permit issued pursuant to this
subsection is subject to Sections 16(H)(2)(f) and 16(H)(4)(b)(iv) below.)
36
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board
of Appeals shall hear and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the
decision was contrary to specific provisions of the Ordinance or contrary to the facts presented
to the Planning Board. The Board of Appeals may only review the record of the proceedings
before the Planning Board. The Board Appeals shall not receive or consider any evidence
which was not presented to the Planning Board, but the Board of Appeals may receive and
consider written or oral arguments. If the Board of Appeals determines that the record of the
Planning Board proceedings are inadequate, the Board of Appeals may remand the matter to
the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii)Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
37
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete written
application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum for
the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii)The Board shall decide all administrative appeals and variance appeals within thirty
five (35) days after the close of the hearing, and shall issue a written decision on all
appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board shall
cause written notice of its decision to be mailed or hand-delivered to the applicant
and to the Department of Environmental Protection within seven (7) days of the
Board's decision. Copies of written decisions of the Board of Appeals shall be
given to the Planning Board, Code Enforcement Officer, and the municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of
Appeals may take an appeal to Superior Court in accordance with State laws within forty-five
(45) days from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of
Appeals may reconsider any decision within forty-five (45) days of its prior decision. A
request to the Board to reconsider a decision must be filed within ten (10) days of the decision
that is being reconsidered. A vote to reconsider and the action taken on that reconsideration
must occur and be completed within forty-five (45) days of the date of the vote on the original
decision. Reconsideration of a decision shall require a positive vote of the majority of the
Board members originally voting on the decision, and proper notification to the landowner,
petitioner, planning board, code enforcement officer, and other parties of interest, including
abuttors and those who testified at the original hearing(s). The Board may conduct additional
hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
38
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this Ordinance
is being violated, he or she shall notify in writing the person responsible for such violation,
indicating the nature of the violation and ordering the action necessary to correct it,
including discontinuance of illegal use of land, buildings or structures, or work being done,
removal of illegal buildings or structures, and abatement of nuisance conditions. A copy of
such notices shall be submitted to the municipal officers and be maintained as a permanent
record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted or
denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings, either
legal or equitable, including seeking injunctions of violations and the imposition of fines, that
may be appropriate or necessary to enforce the provisions of this Ordinance in the name of the
municipality. The municipal officers, or their authorized agent, are hereby authorized to enter
into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing evidence that the illegal
structure or use was constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted in bad faith, or
unless the removal of the structure or use will result in a threat or hazard to public health and
safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
17.
Definitions. See the Town of Otisfield Definitions Ordinance:
Stj 05.13.16
TAFT 08.15.16