1
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
WIRELESS TELECOMMUNICATIONS
FACILITIES ORDINANCE
Town of Otisfield Maine
2
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Table of Contents
Section 1. Title, Effective Date, Amendments and Repeal of Existing Wireless Telecommunications
Facilities Ordinance ...................................................................................................................................... 4
1.1. Title .................................................................................................................................................... 4
1.2. Effective Date and Amendment Dates ............................................................................................. 4
1.3. Amendments ..................................................................................................................................... 4
1.4 Repeal of Existing Wireless Telecommunications Facility Siting Ordinance ................................... 4
Section 2. Authority ..................................................................................................................................... 5
Section 3. Purpose ........................................................................................................................................ 5
Section 4. Applicability ................................................................................................................................. 6
4.1. Exemptions ........................................................................................................................................ 6
Section 5. Review and Approval Authority ................................................................................................. 6
5.1. Approval Required ............................................................................................................................ 6
5.2. Approval Authority ........................................................................................................................... 7
Section 6. Approval Process ......................................................................................................................... 7
6.1. Pre-Application Conference .............................................................................................................. 7
6.2. Application ........................................................................................................................................ 7
6.3. Submission Waiver .......................................................................................................................... 13
6.4. Fees .................................................................................................................................................. 13
6.5. Notice of Complete Application...................................................................................................... 14
6.6. Public Hearing.................................................................................................................................. 14
6.7. Approval .......................................................................................................................................... 15
Section 7. Standards of Review ................................................................................................................. 16
7.1. CEO Approval Standards ................................................................................................................. 16
7.2. Planning Board Approval Standards ............................................................................................... 16
7.3. Standard Conditions of Approval ................................................................................................... 21
7.4 Waiver of Planning Board Approval Standards and Standard Conditions of Approval ................. 24
Section 8. Issuance of Building Permit ...................................................................................................... 24
Section 9. Amendment to an Approved Application ................................................................................ 25
3
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Section 10. Permit Expiration and Abandonment .................................................................................... 25
Section 11. Appeals .................................................................................................................................... 25
Section 12. Administration and Enforcement ........................................................................................... 25
Section 13. Penalties .................................................................................................................................. 26
Section 14. Conflicts and Severability........................................................................................................ 26
Section 15. Definitions ............................................................................................................................... 26
4
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Section 1. Title, Effective Date, Amendments and Repeal of Existing Wireless
Telecommunications Facilities Ordinance
1.1. Title
This Ordinance shall be known and cited as the "Wireless Telecommunications Facilities
Ordinance" of Otisfield, Maine, (hereinafter referred to as the "Ordinance").
1.2. Effective Date and Amendment Dates
A. This Ordinance became effective on:
B. This Ordinance was amended on:
1.3. Amendments
This Ordinance may be amended by a majority vote at the Annual Town Meeting. Amendments
may be initiated by majority vote of the Planning Board or by request of the Board of Selectmen
to the Planning Board or on petition of 10% of the votes cast in the last gubernatorial election in
the Town. The Planning Board shall conduct a public hearing on any proposed amendment.
1.4 Repeal of Existing Wireless Telecommunications Facility Siting Ordinance
Adoption of this Ordinance shall repeal any and all previous Wireless Telecommunications
Facility siting Ordinances. This shall not prevent the enforcement of repealed ordinances with
respect to the time periods in which they were in effect.
5
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Section 2. Authority
This Ordinance is adopted pursuant to the enabling provisions of Article VIII, Part 2, Section 1
of the Maine Constitution; the provisions of Title 30-A M.R.S.A. Section 3001 (Home Rule),
and the provisions of the Planning and Land Use Regulation Act, Title 30-A M.R.S.A. Section
4312 et seq.
Section 3. Purpose
The purpose of this Ordinance is to create a complete and comprehensive stand-alone document
that will not require reference to or review under other plans and ordinances and to provide a
process and an exclusive set of standards for the construction of Wireless Telecommunications
Facilities in order to:
A. Implement an ordinance concerning the provision of wireless telecommunications
services and the siting of their facilities.
B. Establish clear guidelines, standards and time frames for the exercise of municipal
authority to regulate Wireless Telecommunications Facilities.
C. Allow competition in wireless telecommunications service.
D. Encourage the provision of advanced wireless telecommunications services to the largest
number of businesses, institutions and residents of Otisfield.
E. Ensure that Otisfield can continue to protect fairly and responsibly public health, safety
and welfare.
F. Encourage the co-location of Wireless Telecommunications Facilities, thus helping to
minimize adverse visual impacts on the community.
G. Enable Otisfield to discharge its public trust consistent with rapidly evolving federal and
state regulatory policies, industry competition and technological development.
H. Further the goals and policies of the Comprehensive Plan, while promoting orderly
development of the Town with minimal impacts on existing uses.
I. Protect the scenic and visual character of the community.
J. Strive to minimize any potential adverse effect of a Wireless Telecommunication
Facilities on property values.
6
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Section 4. Applicability
This Ordinance applies exclusively to all construction and expansion of Wireless
Telecommunications Facilities, except as provided in section 4.1.
4.1. Exemptions
The following are exempt from the provisions of this Ordinance:
A. Emergency Wireless Telecommunications Facility. Temporary Wireless
Telecommunication Facilities for emergency communications by public officials.
B. Amateur (ham) radio stations. Amateur (ham) radio stations licensed by the Federal
Communications Commission (FCC).
C. Parabolic antenna. Parabolic antennas less than seven (7) feet in diameter that are an
accessory use of the property.
D. Maintenance, repair or reconstruction. Maintenance, repair or reconstruction of a
Wireless Telecommunications Facility and related equipment, provided that there is no
change in the height or any other dimension of the facility and/or project area.
E. Temporary Wireless Telecommunications Facility. Temporary Wireless
Telecommunications Facility in operation for a maximum period of one hundred eighty
(180) days.
F. Antennas as accessory uses. An antenna that is an accessory use to a residential dwelling
unit.
Section 5. Review and Approval Authority
5.1. Approval Required
No person shall construct or expand a Wireless Telecommunication Facility without approval as
follows:
A. Expansion of an Existing Facility and Co-location. Approval by the Code Enforcement
Officer (CEO) is required for:
7
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
1. Any expansion of an existing Wireless Telecommunications Facility that
increases the height of the facility by no more than twenty (20) feet above the
originally approved height. In no case shall the CEO approve an increase in
the height of the facility that would exceed 180 feet. This provision shall not
be waived.
2. Accessory use of an existing Wireless Telecommunications Facility, or
3. Co-location on an existing Wireless Telecommunications Facility.
B. New Construction. Approval of the Planning Board is required for construction of a new
Wireless Telecommunications Facility, and for any expansion of an existing Wireless
Telecommunications Facility that increases the height of the facility by more than 20 feet
above the originally approved height and/or increases the size of the project area. In no
case shall the Planning Board approve an increase in the height of the facility that would
exceed 180 feet. This provision shall not be waived.
5.2. Approval Authority
In accordance with Section 5.1 above, the CEO or Planning Board, as appropriate, shall review
applications for Wireless Telecommunications Facilities and make written findings on whether
the proposed facility complies with this Ordinance.
Section 6. Approval Process
6.1. Pre-Application Conference
All persons seeking approval of the CEO or the Planning Board under this Ordinance shall meet
with the CEO no less than thirty (30) days before filing an application. At this meeting the CEO
shall explain to the applicant the Ordinance provisions as well as application forms and
submissions that will be required under this Ordinance.
6.2. Application
All persons seeking approval of the CEO or of the Planning Board under this Ordinance shall
submit an application as provided below. In all cases, the burden of proof shall be on the
applicant to demonstrate to the CEO or the Planning Board that the required standard(s) have
been met. The Planning Board shall have the authority to engage a qualified independent third
party or parties deemed necessary by the Planning Board to review the application. The cost of
the independent review shall be borne by the applicant.
8
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
The CEO shall be responsible for ensuring that notice of receipt of a written application has been
published in a newspaper of general circulation in the community. Such notice shall be published
within 10 days from the receipt of the written application.
A. Application for CEO Approval. Applications for permit approval by the CEO must
include the following materials and information:
1. Documentation of the applicant's right, title, or interest in the property where
the facility is to be sited, including name and address of the property owner
and the applicant.
2. A copy of the FCC license for the facility or a signed statement from the
owner or operator of the facility attesting that the facility complies with
current FCC regulations.
3. Location map of suitable scale to locate the facility in Otisfield and elevation
drawings of the proposed facility and any other proposed structures showing
color and identifying structural materials.
4. For proposed expansion of a facility, a signed statement that commits the
owner of the facility and his or her successors in interest to:
a. Respond in a timely, comprehensive manner to a request for
information from a potential co-location applicant in exchange for a
reasonable fee not in excess of the actual cost of preparing a response.
b. Negotiate in good faith for shared use by third parties including the
Town of Otisfield for emergency service communications.
c. Allow shared use if an applicant agrees in writing to pay reasonable
charges for co-location.
d. Require no more than a reasonable charge for shared use based on
community rates and generally accepted accounting principles. This
charge may include, but is not limited to, a pro rata share of the cost of
site selection, planning project administration, land costs, site design,
construction and maintenance, financing, return on equity, depreciation,
and all of the costs of adopting the tower or equipment to accommodate
a shared user without causing electromagnetic interference.
B. Application for Planning Board Approval. Nine copies of an application for approval by
the Planning Board must be submitted to the CEO. The application must include the
following information:
9
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
1. Documentation of the applicant's right, title, or interest in the property on
which the facility is to be sited, including name and address of the property
owner and the applicant.
2. A copy of the FCC license for the facility, or a signed statement from the owner
or operator of the facility attesting that the facility complies with current FCC
regulations as well as written approval by all applicable State and Federal
agencies, including but not limited to the FAA and FCC, including a
description of any conditions or criteria for the approval, or a statement from
the agency that no approval is required.
3. A USGS 7.5 minute topographic map showing the location of all structures and
Wireless Telecommunications Facilities above 150 feet in height above ground
level, except antennas located on roof tops, within a five (5) mile radius of the
proposed facility, unless this information has been previously made available
to the municipality. This requirement may be met by submitting current
information (within thirty (30) days of the date the application is filed) from
the FCC Tower Registration Database.
4. A site plan:
a. Prepared by a State of Maine licensed professional engineer indicating
the location, type, and height of the proposed facility, antenna capacity,
on-site and abutting off-site land uses, means of access, setbacks from
property lines, and all applicable American National Standards Institute
(ANSI) technical and structural codes.
b. Certification by the applicant that the proposed facility complies with
all FCC standards for radio emissions is required.
c. A boundary survey for the project area performed by a State of Maine
licensed professional land surveyor.
d. Details of all existing or proposed accessory structures including
buildings, parking areas, utilities, gates, access roads, etc.
e. Details of the tower base or method of attachment to a structure. If the
facility will be attached to an existing building or structure, provide
measurements and elevations of the structure.
f. A soil erosion and sediment control plan for construction and for
permanent control.
10
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
g. Stormwater control plan designed to accommodate a 25-year storm.
h. A phosphorus impact analysis and control plan
i. Maine Department of Transportation Driveway/Entrance Permit if
access to the facility will be from Route 121 or the Bolster Mills Road.
j. Road Opening Permit issued by the Otisfield Road Commissioner.
5. A scenic assessment consisting of the following:
a. Elevation drawings of the proposed facility, and any other proposed
structures, showing height above ground level.
b. A landscaping plan indicating the proposed placement of the facility on
the site, location of existing structures, trees, and other significant site
features; the type and location of plants proposed to screen the facility;
the method of fencing, the color of the tower structure and equipment
shelters and the proposed lighting method.
c. If requested by the Planning Board a balloon test meeting standard
industry specification, on a date and time recommended by the
Planning Board.
d. Photo simulations of the proposed facility taken from perspectives
determined by the Planning Board or their designee during the pre-
application conference. Each photo must be labeled with the line of
sight, elevation, and with the date taken imprinted on the photograph.
The photos must show the color of the facility and method of screening.
The applicant may be asked and should be prepared to provide photo
simulations from at least one company showing how the proposed
tower would appear if camouflaged. If the Planning Board determines
that additional vantage points should be considered, the applicant shall
complete the visual analyses for these locations for the Board's
consideration.
e. A narrative discussing:
i. The extent to which the proposed facility would be visible from
or within a designated scenic resource.
11
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
ii. The tree line elevation of vegetation within 100 feet of the
facility.
iii.The distance to the proposed facility from the designated scenic
resources noted viewpoints.
6. A written description of how the proposed facility fits into the applicant's
telecommunications network. This submission requirement does not require
disclosure of confidential business information.
7. Evidence demonstrating that no existing building, site, or structure can
accommodate the applicant's proposed facility. The evidence for which may
consist of any one or more of the following:
a. Evidence that no existing facilities are located within the targeted
market coverage area as required to meet the applicant's engineering
requirements.
b. Evidence that existing facilities do not have sufficient height or cannot
be increased in height at a reasonable cost to meet the applicant's
engineering requirements.
c. Evidence that existing facilities do not have sufficient structural strength
to support applicant's proposed antenna and related equipment.
Specifically:
i. Planned necessary equipment would exceed the structural
capacity of the existing facility, considering the existing and
planned use of those facilities, and these existing facilities cannot
be reinforced to accommodate the new equipment.
ii. The applicant's proposed antenna or equipment would cause
electromagnetic interference with the antenna on the existing
towers or structures, or the antenna or equipment on the existing
facility would cause interference with the applicant's proposed
antenna.
iii. Existing or approved facilities do not have space on which
planned equipment can be placed so it can function effectively.
12
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
d. For facilities existing prior to the effective date of the application, the
fees, costs, or contractual provisions required by the owner in order to
share or adapt an existing facility are unreasonable. Costs exceeding the
pro rata share of a new facility development are presumed to be
unreasonable.
e. Evidence that the applicant has made diligent good faith efforts to
negotiate co-location on an existing facility, building, or structure, and
has been denied access.
8. Identification of sites, buildings, structures or objects significant in American
history, architecture, archaeology, engineering or culture that are listed or are
eligible for listing on the National Register of Historic Places (see 54 U.S.C.
300308; 36 CFR 60 and 800).
9. A signed statement stating that the owner of the Wireless Telecommunications
Facility and his or her successors and assigns agree to:
a. Respond in a timely, comprehensive manner to a request for
information from a potential co-location applicant, in exchange for a
reasonable fee not in excess of the actual cost of preparing a response.
b. Negotiate in good faith for shared use of the Wireless
Telecommunications Facility by third parties including the Town of
Otisfield for emergency service communications.
c. Allow shared use of the Wireless Telecommunications Facility if an
applicant agrees in writing to pay reasonable charges for co-location.
d. Require no more than a reasonable charge for shared use, based on
community rates and generally accepted accounting principles. This
charge may include, but is not limited to, a pro rata share of the cost
of site selection, planning project administration, land costs, site
design, construction, financing, return on equity, depreciation, and all
of the costs of adapting the tower or equipment to accommodate a
shared user without causing electromagnetic interference. The
amortization of the above costs by the facility owner shall be
accomplished at a reasonable rate over the useful life span of the
facility.
10. A form of surety approved by the Planning Board to pay for the costs of
removing the facility if it is abandoned.
13
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
11. Evidence that a notice of the application has been published in a local
newspaper of general circulation in the community
6.3. Submission Waiver
The CEO or Planning Board, as appropriate, may waive any of the submission requirements
based on a written request of the applicant submitted at the time of application. A waiver of any
submission requirement may be granted only if the CEO or Planning Board finds in writing that
due to special circumstances of the application, the information is not required to determine
compliance with the standards of this Ordinance.
6.4. Fees
A. CEO Application Fee.
An application for CEO approval shall include payment of an application fee as
established by the Board of Selectmen. The application shall not be considered complete
until this fee is paid. The applicant is entitled to a refund of the application fee if the
application is withdrawn within fifteen (15) days of date of filing, less all expenses
incurred by the Town of Otisfield to review the application.
B. Planning Board Application Fee.
An application for Planning Board approval shall include payment of an application fee
as established by the Board of Selectmen. The application shall not be considered
complete until this fee is paid. An applicant is entitled to a refund of the application fee if
the application is withdrawn within fifteen (15) days of date of filing, less all expenses
incurred by the Town of Otisfield to review the application.
C. Planning Board Review Fee.
An applicant for approval by the Planning Board shall pay all reasonable and customary
fees incurred by the municipality that are necessary to review the application including
the cost of any independent review(s). The review fee shall be paid in full prior to issuing
a building permit.
That portion of the review fee not used shall be returned to the applicant within sixty (60)
days of the Planning Board's decision.
14
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
6.5. Notice of Complete Application
Upon receipt of an application, the CEO or the Planning Board, as appropriate, shall provide the
applicant with a dated receipt. Within forty-five (45) days of receipt of an application, the CEO
or Planning Board, as appropriate, shall review the application and determine if the application
meets the submission requirements. The CEO or Planning Board, as appropriate, shall review
any requests for a waiver from the submission requirements and shall act on these requests prior
to determining the completeness of the application.
If the application is complete, the CEO or the Planning Board, as appropriate, shall notify the
applicant in writing of this determination. If the application is incomplete, the CEO shall ensure
that the applicant is notified in writing, specifying the additional materials or information
required to complete the application.
If the application is deemed to be complete, and requires Planning Board review, the Planning
Board shall ensure that all abutters within one thousand (1000) feet of the proposed tower
compound area, as shown on the Assessor's records, shall be notified by first-class mail, that an
application has been accepted as complete. This notice shall contain a brief description of the
proposed activity and the name of the applicant, give the location of a copy of the application
available for inspection, and provide the date, time, and place of the Planning Board meeting at
which the application will be considered. Failure on the part of any abutter to receive such notice
shall not be grounds for delay of any consideration of the application nor denial of the project.
6.6. Public Hearing
A. For applications for Planning Board approval under Section 5.1B, a public hearing shall
be held within forty-five (45) days of the date of finding the application complete.
B. The Planning Board shall publish the time, date and place of the hearing at least two
times, the date of the first publication to be at least seven days prior to the hearing in a
newspaper of area wide circulation. All abutters within one thousand (1,000) feet of the
proposed compound area, as shown on the Assessor's records, shall be notified, by first-
class mail, at least seven (7) days prior to the hearing by the Planning Board. Public
hearings by the Board shall be conducted according to the following procedures.
1. The chairman shall call public hearings as required. A quorum of the Planning
Board is necessary to conduct an official public hearing. The chairman shall preside
at all public hearings.
15
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
2. The secretary shall maintain a permanent record of all public hearings. All records
to be maintained or prepared by the secretary are public records. They shall be filed
in the municipal clerk's office and may be inspected at reasonable times.
3. The Planning Board may provide, by regulation which shall be recorded by the
secretary, for any matter relating to the conduct of any public hearing, provided that
the chair may waive any regulation upon good cause shown.
4. The Planning Board may receive any oral or documentary evidence but shall
provide as a matter of policy for the exclusion of irrelevant, immaterial or unduly
repetitious evidence. Every party has the right to present the party's case or defense
by oral or documentary evidence, to submit rebuttal evidence and to conduct any
cross-examination that is required for a full and true disclosure of the facts.
5. The transcript or tape recording of testimony, if such a transcript or tape recording
has been prepared by the Planning Board, and the exhibits, together with all papers
and requests filed in the proceeding, constitute the public record. All decisions
become a part of the record and must include a statement of findings and
conclusions, as well as the reasons or basis for the findings and conclusions.
6.7. Approval
A. CEO Approval.
Within thirty (30) days of receiving a complete application for approval under section
5.1A , the CEO shall approve, approve with conditions, or deny the application in
writing, together with the findings on which that decision is based. The CEO shall
approve the application if the CEO finds that the application complies with the provisions
in Section 7.1 of this Ordinance. The time period may be extended upon agreement
between the applicant and the CEO.
The CEO shall notify all abutters within one thousand (1,000) feet of the proposed tower
compound area of the decision to issue a permit under this section.
B. Planning Board Approval.
Within ninety (90) days of receiving a complete application for approval under section
5.1 B, the Planning Board shall approve, approve with conditions, or deny the application
in writing, together with the findings on which that decision is based. However, if the
Planning Board has a waiting list of applications that would prevent the Planning Board
from making a decision within the required ninety (90) day time period, then a decision
on the application shall be issued within sixty (60) days of the completed Planning Board
review. This time period may be extended upon agreement between the applicant and the
Planning Board.
16
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Section 7. Standards of Review
To obtain approval from the CEO or the Planning Board, an application must comply with the
standards in this section.
7.1. CEO Approval Standards
An application for approval by the CEO under Section 5.1.A must meet the following standards:
A. The proposed facility is an expansion, accessory use, or co-location to a structure legally
existing at the time the application is submitted.
B. The applicant has sufficient right, title, or interest to locate the proposed facility on the
existing structure.
C. The proposed facility increases the height of the legally existing structure by no more
than twenty (20) feet.
D. The proposed facility will be constructed with materials and colors that match or blend
with the surrounding natural or built environment to the maximum extent practicable.
7.2. Planning Board Approval Standards
An application for approval by the Planning Board under Section 5.1.B must meet the
following standards:
A. Siting on Municipal Property. If an applicant proposes to locate a new Wireless
Telecommunications Facility, or expand an existing facility on municipal property, the
applicant must show the following:
1. The proposed location complies with applicable municipal policies and
ordinances that relate to the use of municipal property.
2. The proposed facility will not interfere with the intended purpose of the
property.
3. The applicant has adequate liability insurance and a lease agreement with the
municipality that includes reasonable compensation for the use of the property
and other provisions to safeguard the public rights and interests in the property.
17
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
B. Design for Co-location. A new Wireless Telecommunications Facility and related
equipment must be designed and constructed to accommodate expansion for future co-
location of at least three additional wireless telecommunications facilities or providers.
However, the Planning Board may waive or modify this standard where the height
limitation effectively prevents future co-location. Proposals for the siting of Wireless
Telecommunications Facilities or antennae on existing towers or Alternative Tower
Structures (ATS) or at locations that presently have Wireless Telecommunications
Facilities are favored over proposals for construction of new towers on sites where
towers do not presently exist. The Planning Board review process guides Wireless
Telecommunications Facility applicants towards co-location and requires the applicant
to prove, among other factors, that their proposed antennas or facilities cannot be
accommodated by existing tower structures. The Planning Board shall have the authority
to determine whether or not co-location is a reasonable, practical and feasible option.
C. Height. A new Wireless Telecommunications Facility must be no more than one hundred
eighty (180) feet in height. The applicant shall be prepared to justify the height being
requested.
D. Setbacks. A new or expanded Wireless Telecommunications Facility shall be set back a
minimum of one hundred twenty-five percent (125%) of its height from the outer
perimeter of the tower compound area. This area shall be considered the fall zone. The
setback may be satisfied by including the areas outside the outer perimeter of the tower
compound area.
E. Landscaping. A new Wireless Telecommunications Facility and related equipment must
be screened with plants from view by abutting properties to the maximum extent
practicable. Existing plants and natural land forms on the site shall also be preserved to
the maximum extent practicable. All Wireless Telecommunication Facilities shall
maintain the required setbacks as undisturbed vegetated buffers except for the access
road. The Planning Board may require additional plantings in the buffer area(s) to
enhance the quality and effectiveness of the buffer area to serve as a visual screen. The
size and quantity of plantings shall be subject to Planning Board approval.
F. Fencing. A new Wireless Telecommunications Facility must be fenced to discourage
trespass on the facility and to discourage climbing on any structure by trespassers. Access
to tower(s) shall be through a lockable gate. Roof mounted towers are exempt.
G. Lighting. A new Wireless Telecommunications Facility must be illuminated only as
necessary to comply with FAA or other applicable State and Federal requirements.
However, security lighting may be used as long as it is shielded to be down-directional to
retain light within the boundaries of the tower compound area to the maximum extent
practicable.
18
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
H. Color and Materials. A new Wireless Telecommunications Facility must be constructed
with materials and colors that match or blend with the surrounding natural or built
environment, to the maximum extent practicable. Unless otherwise required, muted
colors, earth tones and subdued hues shall be used.
I. Structural Standards. A new wireless telecommunications facility must comply with the
current Electronic Industries Association/ Telecommunications Industries Association
(EIA/TIA) 222 Revision Standard entitled "Structural Standards for Steel Antenna
Towers and Antenna Supporting Structures".
J. Visual Impact. The proposed wireless telecommunications facility will have no
unreasonable adverse impact upon designated scenic resources within the Town, as
identified either in the Town of Otisfield's Comprehensive Plan's Significant Scenic
Vistas Table, or by a State or Federal agency. If the facility is to be sited above the ridge
line, it must be designed to minimize its profile by blending with the surrounding existing
natural and man-made environment to the maximum extent practical using available
materials, natural buffers, and the Tower location site. In determining the potential
unreasonable adverse impact of the proposed facility upon the designated scenic
resources, the Planning Board shall consider the following factors:
1. The extent to which the proposed wireless telecommunications facility is
visible above tree line, from the viewpoint(s) of the impacted designated
scenic resource.
2. The type, number, height, and proximity of existing structures and features, and
background features within the same line of sight as the proposed facility.
3. The extent to which the proposed wireless telecommunications facility
would be visible from the viewpoint(s).
4. The amount of vegetative screening or the impact of any artificial screening.
5. The distance of the proposed facility from the viewpoint and the facility's
location within the designated scenic resource.
6. The presence of reasonable alternatives that allow the facility to function
consistently with its purpose.
7. If more than one tower is proposed on a single lot or parcel, they shall be
clustered as closely together as technically possible.
19
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
K. Noise. During construction, repair, or replacement the operation of a back-up power
generator is only allowed between seven (7) am and nine (9) pm. There is no restriction
of operation of an auxiliary generator once the Wireless Telecommunications Facility is
operational.
L. Historic & Archaeological Properties. The proposed facility, to the greatest degree
practicable, will have no unreasonable adverse impact upon a historic district, site or
structure which is currently listed on or eligible for listing on the National Register of
Historic Places.
M. Surface Water Drainage. Adequate provision shall be made for disposal of all storm
water generated within the project area including access route through a management
system of ditches, swales, culverts, underdrains, and/or storm drains. The storm water
management system shall be designed to conduct storm water flows to existing
watercourses or storm drains.
1. All components of the storm water management system shall be
designed to meet the criteria of a 25-year storm.
2. Outlets shall be stabilized against soil erosion by stone riprap or other
suitable materials to reduce storm water velocity.
3. The storm water management system shall be designed to
accommodate upstream drainage, taking into account existing
conditions and approved or planned developments not yet built and
shall include a surplus design capacity factor of 25% for potential
increase in upstream runoff.
4. Downstream drainage requirements shall be studied to determine the
effect of the proposed project. The storm drainage shall not overload
existing or future planned storm drainage systems downstream from
the project. The applicant shall be responsible for financing any
improvements to existing drainage systems required to handle the
increased storm flows.
N. Conservation, Erosion and Sediment Control. Soil erosion and sedimentation of water-
courses and water bodies shall be minimized. The following measures shall be included,
where applicable, as part of any Wireless Telecommunications Facility and approval.
1.
Stripping of vegetation, regrading or other development shall be done
in such a way as to minimize erosion.
20
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
2.
Development shall keep cut-fill operations to a minimum and ensure
conformity with topography so as to create the least erosion potential
and so as to adequately handle surface water runoff.
3.
The disturbed area and the duration of exposure of the disturbed area
shall be kept to a practical minimum.
4.
Disturbed soils shall be stabilized as quickly as practical.
5.
Temporary vegetation or mulching shall be used to protect exposed
critical areas during development.
6.
The permanent (final) vegetation and mechanical erosion control
measure shall be installed as soon as practical on the site.
7.
Until the disturbed area is stabilized, sediment in the runoff water
shall be trapped by the use of debris basins, sediment basins, silt traps
or other acceptable methods.
8.
Whenever sedimentation is caused by stripping vegetation, regrading
or other development, it shall be the responsibility of the developer
causing such sedimentation to remove it from all adjoining surfaces,
drainage systems and watercourses and to repair any damage at his
or her expense as quickly as possible.
9.
Maintenance of drainage facilities or watercourses originating and
completely on private property is the responsibility of the owner to
the point of open discharge at the property line or at a communal
watercourse within the property.
10.
The standards set forth in the Maine Erosion and Sediment Control
Handbook for Construction, Best Management Practices (March 1991
and as amended) shall be employed.
O. Phosphorous Export. A Wireless Telecommunications Facility proposed within the direct
watershed of a lake or pond listed in Appendix A shall be designed to limit phosphorus
runoff to the levels established in Appendix A.
1. Phosphorus export shall be calculated according to the procedures
defined in "Phosphorus Control in Lake Watersheds: A Technical
21
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Guide for Evaluating New Development" (Maine DEP et.al.,
September 1989 with revision in 1992 and as may be amended).
Copies of all worksheets and calculations shall be submitted to the
Planning Board.
2. Phosphorus control measures shall meet the design criteria contained
in "Phosphorus Control in Lake Watersheds: A Technical Guide for
Reviewing Development" (Maine DEP et al., September 1989 with
revisions in 1992 or as may be amended). The Board shall require the
reasonable use of vegetative buffers, limits on clearing, and shall encourage the
use of other nonstructural measures prior to allowing the use of high-
maintenance structural measures such as infiltration systems and wet ponds.
7.3. Standard Conditions of Approval
The following standard conditions of approval shall be a part of any approval issued by the CEO
or Planning Board. Where necessary to ensure that an approved project meets the criteria of this
Ordinance, the CEO and Planning Board can impose additional conditions of approval.
Reference to the conditions of approval shall be clearly noted on the final approved site plan, and
shall include:
A. The owner of the wireless telecommunications facility and his or her successors and
assigns agree to:
1. Respond in a timely, comprehensive manner to a request for information from a
potential co-location applicant, in exchange for a reasonable fee not in excess
of the actual cost of preparing a response.
2. Negotiate in good faith for shared use of the wireless telecommunications
facility by third parties.
3. Allow shared use of the wireless telecommunications facility if an applicant
agrees in writing to pay reasonable charges for co-location.
4. Require no more than a reasonable charge for shared use of the wireless
telecommunications facility, based on community rates and generally accepted
accounting principles. This charge may include, but is not limited to, a pro rata
share of the cost of site selection, planning project administration, land costs,
site design, construction and maintenance, financing, return on equity,
depreciation, and all of the costs of adapting the tower or equipment to
accommodate a shared user without causing electromagnetic interference. The
22
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
amortization of the above costs by the facility owner shall be accomplished at a
reasonable rate, over the life span of the useful life of the wireless
telecommunications facility.
B. Upon request by the Town of Otisfield, the applicant shall certify compliance with all
applicable FCC radio frequency emissions regulations.
C. Guarantees. All guarantees shall be on a continuous basis, with any provision for
cancellation to include that a minimum thirty (30) day notice of cancellation or non-
renewal be sent by certified mail to the Town of Otisfield. The guarantee shall be for a
minimum term of five years. It must contain a mechanism, satisfactory to the Planning
Board, for review of the cost of removal of the structure every five (5) years, and a
mechanism for increasing the amount of the guarantee should the revised cost estimate so
necessitate;
1. Performance Guarantee. Any application that required Planning Board review
and approval may be required to post a performance guarantee for the
development, construction, or modification to the Wireless
Telecommunications Facility. The Planning Board shall determine whether or
not a performance guarantee is required based on the Board's assessment of the
potential of the project to cause the Town to incur expenses, such as to stabilize
the site if the project is not completed.
The amount of the guarantee shall be sufficient to return the land to a condition
as near to the original pre-construction condition as practical as determined by
the Planning Board. The amount of the guarantee shall be determined by the
Planning Board based on estimates from independent contractors. The type of
guarantee shall be approved by the Board of Selectmen. The guarantee shall be
released only as authorized by the Planning Board.
2. Guarantee for Removal of Abandoned Wireless Communication Facilities.
a. The applicant for a new tower shall post a guarantee in the form of a
continuous corporate surety bond in favor of the Town equal to 125% of
the estimated demolition and removal cost of the tower and associated
facilities if abandoned at any time by the applicant. Estimates of
demolition and removal costs shall be provided by an independent
contractor and shall not be based on services being provided by Town
employees and Town equipment.
b. The amount of the guarantee shall be approved by the Planning Board and
shall be sufficient to return the land to a condition as near to the original
23
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
pre-construction condition as practical as determined by the Planning
Board.
c. Unless the landowner requests otherwise, all above ground structures,
equipment, foundations, guy anchors, utilities and access roads or
driveways specifically constructed to service the tower, structures,
equipment or utilities shall be removed, and the land returned to a
condition as near to the original pre-construction condition as practical.
d. The type of the guarantee shall be approved by the Board of Selectmen.
The Board of Selectmen shall have the authority to require either a
certified check payable to the Town of Otisfield, a savings account
passbook issued in the name of the Town or a faithful bond running to the
Town of Otisfield and issued by a surety company authorized to do
business in Maine and acceptable to the Board of Selectmen.
3. Proof of financial capacity to build, maintain, and remove the proposed tower
must be submitted.
D. Inspections;
1. During construction, a schedule acceptable to the Planning Board for
inspections during construction will be established by the CEO.
2. Completed Wireless Telecommunications Facility.
a. Inspections of towers by either a Maine Licensed Professional Engineer or a
qualified third party mutually agreed upon by the applicant and the CEO
shall be performed to assess structural integrity. Such inspections shall be
performed as follows:
i.
Monopole towers - at least once every seven (7) years following
completion of construction. The inspection shall take place
between the sixth and seventh year of the repeat sequence.
ii.
Self-supporting towers - at least once every five (5) years
following completion of construction. The inspection shall take
place between the fourth and fifth year of the repeat sequence.
iii.
Guyed towers - at least once every three (3) years following
completion of construction. The inspection shall take place
between the second and third year of the repeat sequence.
24
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
b. The inspection report shall be submitted to the CEO within thirty (30) days
of its receipt by the tower owner. Based upon the results of the inspection,
the CEO may require repair or demolition of the tower.
c. The cost of such inspections, reports, repairs or demolition required under
this Section of the Ordinance shall be borne entirely by the tower owner.
Required repairs shall be completed within ninety (90) days or less as
required by the CEO safety reasons.
d. Failure to provide required inspection reports in the required time schedule
shall be deemed prima facie evidence of abandonment.
E. Removal and Storage of Materials
1. All used structural and electronic components shall be removed and properly
disposed of once they have exceeded their useful life and are no longer in use.
This standard includes, but is not limited to, removing used guy wires, used
fence parts, and structural components for towers.
2.
Outside storage of materials shall not be permitted except as specifically
approved by the Planning Board.
7.4 Waiver of Planning Board Approval Standards and Standard Conditions of Approval
A
. If the Planning Board finds that extraordinary and unnecessary hardships may
result from strict compliance with this Ordinance, or where there are special
circumstances of a particular application, it may waive any provisions of Section 7.2
except for 7.2.C, Height, 7.2.D, Setbacks, and 7.3, Conditions of Approval, provided
that such waiver will not have the effect of nullifying the purpose of this Ordinance.
B. In granting waivers to any of the provisions of Section 7.2 the Planning Board shall
require such conditions as that will assure the objectives of this Ordinance are met.
Section 8. Issuance of Building Permit
The CEO shall not issue a permit for the construction of a new Wireless Telecommunication
Facility or any change to an existing Wireless Telecommunication Facility that requires CEO or
Planning Board review until the CEO or Planning Board has approved the facility and all
applicable conditions have been met.
25
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
Section 9. Amendment to an Approved Application
Any changes to an approved application must be approved by the CEO or the Planning Board, in
accordance with Section 5.
Section 10. Permit Expiration and Abandonment
A building permit shall become void unless construction operations are commenced within six (6)
months from the date of approval unless such time is extended by the CEO. If the structure is not
completed within twelve (12) months, a new permit should be issued at no fee.
A wireless telecommunications facility that is not operated for a continuous period of twelve (12)
months shall be considered abandoned. The CEO shall notify the owner of an abandoned facility
in writing and order the removal of the facility within ninety (90) days of receipt of the written
notice. The owner of the facility shall have thirty (30) days from the receipt of the notice to
demonstrate to the CEO that the facility has not been abandoned.
If the owner fails to show that the facility is in active operation, the owner shall have sixty (60)
days to remove the facility. If the facility is not removed within this time period, the Town of
Otisfield may remove the facility at the owner's expense. The owner of the facility shall pay all
site reclamation costs deemed necessary and reasonable to return the site to its pre-construction
condition, including the removal of roads and reestablishment of vegetation.
If a surety has been given to the Town for removal of the facility, the owner of the facility may
apply to the Planning Board for release of the surety when the facility and related equipment are
removed to the satisfaction of the Planning Board.
Section 11. Appeals
Any person aggrieved by a decision of the CEO or the Planning Board under this Ordinance may
appeal the decision to the Board of Appeals. Written notice of an appeal must be filed with the
Board of Appeals within thirty (30) days of the decision. The notice of appeal shall clearly state
the reasons for the appeal.
Section 12. Administration and Enforcement
After completion of the project to the satisfaction of the CEO, the CEO will issue a Certificate of
Compliance.
The CEO shall enforce this ordinance. If the CEO finds that any provision of this Ordinance has
been violated, the CEO shall notify in writing the person responsible for such violation,
indicating the nature of the violation, and ordering the action necessary to correct it.
26
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
The CEO shall order correction of the violation and may take any other legal action to ensure
compliance with this ordinance. A copy of the notification shall be sent to the Otisfield Planning
Board.
The Board of Selectmen, or its authorized agent, is authorized to enter into administrative
consent agreements for the purpose of eliminating violations of this Ordinance and recovering
fines without court action. Such agreements shall not allow a violation of this Ordinance to
continue unless: there is clear and convincing evidence that the violation occurred as a direct
result of erroneous advice given by the CEO or the Planning Board upon which the applicant
reasonably relied to its detriment and there is no evidence that the owner acted in bad faith; the
removal of the violation will result in a threat to public health and safety or substantial
environmental damage.
Section 13. Penalties
Any person who owns or controls any building or property that violates this Ordinance shall be
fined in accordance with Title 30-A M.R.S.A. § 4452. Each day such violation continues after
notification by the CEO shall constitute a separate offense.
Section 14. Conflicts and Severability
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision
of this Ordinance, the conflict or inconsistency will be resolved by the CEO or Planning Board,
as appropriate, and the Wireless Telecommunication applicant. The resolution will be
documented in the public record. The agreed resolution shall apply to the specific application
prior to any final decision being made.
The invalidity of any part of this Ordinance shall not invalidate any other part of this Ordinance.
Section 15. Definitions
In general, words and terms used in this Ordinance shall have their customary dictionary
meanings. More specifically, certain words and terms used herein are defined as follows:
ABUTTER - The owner(s) of property within a 1,000 feet of the tower compound and any
additional landowners as deemed necessary by the Planning Board, whether or not these
properties are separated by a public or private street or right of way. The owners of property shall
be considered to be the parties listed by the Tax Assessor of Otisfield as the ones against whom
taxes are assessed.
27
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
ACCESSORY STRUCTURE OR USE - A separate use or structure which is customarily both
incidental and subordinate to the principal structure and is on the same lot only. Accessory uses,
when aggregated, shall not subordinate the principal use of the lot. A deck or similar extension of
the principal structure or a garage attached to the principal structure by a roof or a common wall
is considered part of the principal structure.
AGGRIEVED PARTY - An owner of land whose property is directly or indirectly affected by
the granting or denial of an approval, permit or waiver under this Ordinance; a person whose
land abuts land or is across a road or street or body of water from land for which an approval,
permit or waiver has been granted; or any other person or group of persons who have suffered
particularized injury as a result of the granting or denial of such approval, permit or waiver.
ALTERATION - Any change or modification in construction (normal maintenance of buildings
or property shall not be misconstrued as an alteration) or change in the structural members of a
building or structure such as bearing walls, columns, beams or girders, or in the use of a
building. The term shall also include change, modification or addition of a deck, dormer or roof
of a building.
ALTERNATIVE TOWER STRUCTURES (ATS) - Clock towers, bell steeples, light poles,
water towers, electrical transmission line towers, and similar alternative mounting structures that
camouflage or conceal the presence of antennas or towers associated with a Wireless
Telecommunication Facility.
ANTENNA - any system of poles, panels, rods, reflecting discs or similar devices used for the
transmission or reception of radio or electromagnetic frequency signals.
ANTENNA SUPPORT STRUCTURE - Any pole, telescoping mast, tower tripod, or other
structure that attaches to a tower and supports one or more antenna(s).
APPLICANT - A person who applies for a Wireless Telecommunication Facility siting. An
applicant can be the landowner of record or the wireless telecommunications service provider or
agent of record with the landowner's (or other legally designated representative) written
permission.
BUILDING - See Structure
BUILDING PERMIT - The official written document to be displayed at the construction site that
grants the authorization for the construction. This document is issued by the Building Inspector.
28
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
CERTIFICATE OF COMPLIANCE - A document signed by the Code Enforcement Officer
stating that a Wireless Telecommunications Facility is in compliance with all of the provisions of
this Ordinance.
CODE ENFORCEMENT OFFICER - A person certified under Title 30-A MRSA, Section 4451
(including exceptions in subsection 4451, paragraph 1) and employed by a municipality to
enforce all applicable comprehensive planning and land use laws and ordinances.
CO-LOCATION - means the use of a wireless telecommunications facility by more than one
wireless telecommunications provider.
COMMUNITY RATES- The amount that may be charged for colocation as established by the
Maine Public Utilities Commission.
COMPLETE APPLICATION - An application shall be considered complete upon submission of
the required fee and all information required by this Ordinances, or by a vote by the CEO or
Planning Board to waive the submission of required information. The CEO or Planning Board
shall issue a written statement to the applicant upon its determination that an application is
complete.
COMPOUND AREA - A compound area includes the base of the Wireless Telecommunications
Facility support structure, any equipment facilities and any security fences.
COMPREHENSIVE PLAN - A document or interrelated documents adopted by the Legislative
Body, containing and inventory and analysis of existing conditions, a compilation of goals for
the development of the community, an expression of policies for achieving these goals, and a
strategy for implementation of the policies.
CONSTRUCTION - Includes building, erecting, altering, reconstructing, moving upon or any
physical operations on the premises which are required for construction. Excavating, fill,
drainage, and the like, shall be considered a part of construction.
DESIGNATED SCENIC RESOURCE - A specific location, view or corridor, identified as a
scenic resource in the Otisfield Comprehensive Plan's Significant Scenic Vistas Table, or by a
State or Federal agency, which consists of:
1. A three dimensional space extending out from a particular viewpoint focusing on a
single object such as a mountain, resulting in a narrow corridor; or on a group of objects
such as a mountain range, resulting in a panoramic view or corridor, or;
29
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
2. Lateral terrain features such as valley sides or woodland as observed to either side of
the observer, constraining the view into a narrow or particular field, as seen from a
viewpoint.
DEVELOPMENT - any change caused by individuals or entities to improved or unimproved real
estate, including but not limited to, the construction of buildings or other structures; the
construction of additions or substantial improvements to buildings or other structures; mining,
dredging, filling, grading, paving, excavation, drilling operations, or storage of equipment or
materials; and the storage deposition, or extraction of materials, public or private sewage
disposal systems or water supply facilities.
DRIVEWAY - A vehicular access-way serving one (1) lot that provides access to a street. A
vehicular access-way serving two lots or less that provides access to a street. In the Shoreland
Zone a driveway is limited in length to 500 feet.
DUE DILIGENCE - A process performed by a Wireless Telecommunications Facility applicant
to determine the physical condition, suitability and feasibility of a landowner's property for cell
phone purposes. This includes, but is not limited to, performing signal, topographical,
geotechnical, structural and environmental testing, surveying and reviewing title on the property
as well as obtaining all of the certificates, permits and other approvals that may be required by
any Federal, State or Local government.
EMERGENCY OPERATIONS - Operations conducted for the public health, safety or general
welfare, such as protection of resources from immediate destruction or loss, law enforcement,
and operations to rescue human beings, property and livestock from the threat of destruction or
injury.
ENGINEER -
MUNICIPAL: Any Maine licensed professional engineer hired or retained by the
municipality, either as staff or on a consulting basis.
PROFESSIONAL: Any Maine licensed professional engineer
EXPANSION (WIRELESS Telecommunications Facility) - The addition of antennas, towers, or
other devices to an existing structure.
FAA - the Federal Aviation Administration, or its lawful successor.
FACILITY - See Wireless Telecommunications Facility
FALL ZONE - The area on the ground from the base of a structure mounted Wireless
Telecommunications Facility that forms a circle with a radius equal to one hundred twenty-five
(125) % of the height of the facility, including any antennas or other appurtenances. The fall
30
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
zone is the area within which there is a potential hazard from falling debris i.e., ice or collapsing
material.
FCC - The Federal Communications Commission, or its lawful successor.
FOUNDATION - The supporting substructure of a building or other structure, excluding wooden
sills and post supports, but including basements, slabs, frost walls, or other base consisting of
concrete, block, brick or similar material.
GRADE - In relation to buildings, it is the average of the finished ground level at the center of
each wall of a building.
GUARANTEE - See Surety.
HEIGHT OF STRUCTURE - means the vertical measurement from a point on the ground at the
mean finish grade adjoining the foundation as calculated by averaging the highest and lowest
finished grade at the base of the building or structure, to the highest point of the building or
structure. The highest point shall exclude farm building components, flagpoles, chimneys,
ventilators, skylights, domes, water towers, bell towers, church spires, processing towers, tanks,
bulkheads, or other building accessory features usually erected at a height greater than the main
roofs of buildings.
HISTORIC STRUCTUE- any structure that is:
1. Listed individually on the National Register of Historic Places (a listing maintained by
the Department of the Interior) or preliminarily determined by the Secretary of the
Interior as meeting the requirements for individual listing on the National Register.
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to
the historical significance of a registered historic district or a district preliminarily
determined by the Secretary of the Interior to qualify as a registered historic district.
3. Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior.
4. Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified either: a) by an approved state program as
determined by the Secretary of the Interior; or b) directly by the Secretary of the Interior
in states without approved programs.
31
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
5. Identified by a governmental agency such as the Maine Historic Preservation
Commission as having significant value as an historic or archaeological resource and any
areas which have been listed or are eligible to be listed on the National Register of
Historic Places.
LEASED PREMISES - The Any Maine licensed professional engineer specific portion of a
landowner's property leased by a cell site carrier for telecommunications purposes. The leased
premises are identified on an exhibit to the cell tower lease.
LINE OF SIGHT - (Designated Scenic Resource) the direct view of the object from the designated
scenic resource.
LOT - An area of land in one ownership, or leasehold, with ascertainable boundaries established
by deed or instrument of record, or a segment of land ownership defined by lot boundary lines on
a land subdivision plan duly approved by the Planning Board and recorded in the County
Registry of Deeds.
MAINTENANCE/NORMAL MAINTENANCE - The regular, routine maintenance of a
Wireless Telecommunications Facility including but not limited to painting, changing light
bulbs, plowing and maintaining the existing access road and gate, fence repair and maintenance,
maintenance of the buffer, replacing an existing antenna with a functionally equivalent antenna,
and changing or repairing electronic components that do not increase the broadcast capacity of
the Wireless Telecommunications Facility in excess of the exemption standards contained in
FCC Office of Engineering and Technology (OET) Bulletin #65. This definition specifically
includes painting provided that the painting. This definition specifically excludes widening an
access road, increasing tower height, replacing light fixtures, and increasing the broadcast
capacity of a Wireless Telecommunications Facility within the exemption standards contained in
FCC OETC Bulletin #65.
MODIFICATION OF AN EXISTING TELECOMMUNICATIONS FACILITY - Any change,
or proposed change, in power input or output, number of antennas, change in antenna type(s) or
model(s), repositioning of antenna(s), or change in number of channels per antenna above the
maximum number approved under an existing permit.
MODIFICATION OF AN EXISTING TOWER OR STRUCTURE - Any change, or proposed
change, in dimensions of an existing and permitted tower or other structure designed to support
telecommunications transmission, receiving and/or relaying antennas and/or equipment.
M.R.S.A. - Maine Revised Statutes Annotated
32
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
NEW CONSTRUCTION - A structure for which the construction commenced on or after the
effective date of this Ordinance. It shall also include any subsequent improvements to such
structures.
NEW STRUCTURE OR STRUCTURES - Includes any structure for which construction begins
on or after June 27, 2015. The area included in the expansion of an existing structure is deemed
to be a new structure.
NEW TOWER - A wireless telecommunication tower that is constructed after the adoption of
these standards on June 27, 2015.
PARABOLIC ANTENNA - (also known as a satellite dish antenna) An antenna which is bowl-
shaped, designed for the reception and/or transmission of radio frequency communication signals
in a specific directional pattern.
PERFORMANCE GUARANTEE - A performance bond or surety bond held by the Town of
Otisfield; issued by an insurance company or bank to guarantee satisfactory completion of the
project by the applicant; also denotes a collateral deposit of "good faith money".
PERMIT - An official action which sets forth the rights and obligations extended by the Town of
Otisfield to an operator to own, construct, maintain, and operate its Wireless Telecommunication
Facility within the boundaries of the Town of Otisfield.
PERMITTEE - An applicant who is granted a permit for a tower and/or Wireless
Telecommunications Facility by the Town of Otisfield.
PRINCIPAL USE - A use other than one which is wholly incidental or accessory to the use
of another building or use on the same premises.
PROJECT AREA- Includes the land area needed for access to the Wireless Telecommunications
Facility, including area for drainage, the tower compound area, parking and maneuvering areas,
and fall zone area.
RECONSTRUCTION- The rebuilding, improvements and/or upgrading to a Wireless
Telecommunications Facility, provided that there is no change in the height or any other
dimension of the facility and/or project area.
RIGHT-OF-WAY - A strip of land, described in a deed, and dedicated to the purpose of
providing access to a parcel or parcels of land abutting it, and indicating responsibility for
maintaining said right of way.
33
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
ROAD - Any public or private way designed for vehicular access, other than driveways, farm
roads, trails or logging roads. The term "roads" includes synonymous words including, street,
avenue, highway, lane, way, etc.
SETBACK - The minimum horizontal distance from a lot line, right of way or normal high-water
line to the nearest part of a structure, road, parking space or other regulated object or area.
START OF CONSTRUCTION - The date the building permit was issued, provided the actual
start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial
improvement or other improvement was within 180 days of the permit date. The actual start
means either the first placement of permanent construction of a structure on a site, such as the
pouring of a slab or footings, the installation of piles, the construction of columns, or any work
beyond the work of excavation; or the placement of a manufactured home on a foundation.
Permanent construction does not include land preparation, such as clearing, grading and filling;
nor does it include the installation of streets and/or walkways, nor does it include excavation for
basements, footings, piers, or foundations, or the erection of temporary forms; nor does it include
installation on the property of accessory buildings such as garages or sheds not occupied as
dwelling units or not part of the main structure. For a substantial improvement, the actual start of
construction means the first alteration of any wall, ceiling, floor or other structural part of the
building, or modification of any construction element, whether or not that alteration affects the
external dimensions of the building.
STRUCTURE - Anything constructed or erected, the use of which requires a fixed location on or
in the ground or in the water, or an attachment to something having a fixed location on the
ground, including buildings, signs, commercial park rides and games, carports, porches, and
other building features, including stacks and antennas, but not including sidewalls, fences,
driveways, parking lots, and field or garden walls or embankment retaining walls.
SURETY - Surety bond or guarantee; a pledge or formal promise made to secure against loss,
damage, default or for the fulfillment of an obligation; a guarantee or security; the payment of a
debt. The type of surety/guarantee shall be approved by the Board of Selectmen and may
include any of the following: a certified check payable to the Town of Otisfield, a savings
account passbook issued in the name of the Town or a faithful performance bond running to the
Town of Otisfield; issued by a surety company authorized to do business in Maine.
SURVEY - A location drawing, prepared by a Maine licensed professional surveyor licensed by
the State of Maine, of a landowner's property and its boundaries. A Wireless
Telecommunications Facility application requires a survey as part of its due diligence.
TARGETED MARKET COVERAGE AREA - The area which is targeted to be served by a
proposed Wireless Telecommunications Facility.
34
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
TOWER - Shall mean any structure, whether freestanding or in association with a building or
other permanent structure, that is designed and constructed primarily for the purposes of
supporting one or more antennae, including self-supporting lattice towers, guy towers, or
monopole towers. The term includes radio and television transmission towers, microwave
towers, common-carrier towers, cellular telephone towers, alternative tower structures, and
similar structures.
TOWER COMPOUND AREA - A tower compound includes the base of the Wireless
Telecommunications Facility support structure, any equipment facilities and any security fences.
TOWER HEIGHT - means the vertical distance measured from the base of the antenna support
structure at grade to the highest point of the structure, even if said highest point is an antenna.
Measurement of tower height shall include antenna, base pad, and other appurtenances and shall
be measured from the finished grade of the facility site. If the support structure is on a sloped
grade, then the average between the highest and lowest grades shall be used in calculating the
antenna height.
UNREASONABLE ADVERSE IMPACT - The proposed project would produce an end result
which is:
1. Excessively out of character with the designated scenic resources affected, including
existing buildings, structures, and features within the designated scenic resource.
2. Would significantly diminish the scenic value of the designated scenic resource.
USE - The purpose for which land or a structure is arranged, designed, or intended, or for which
land or a structure is or may be occupied.
VEGETATION - All live trees, shrubs, ground cover, and other plants, including without
limitations, trees, both over and under four (4 inches in diameter, measured four and one half
(4.5) feet above ground level.
VIEWPOINT - That location which is identified either in the Comprehensive Plan or by a
Federal or State agency, and which serves as the basis for the location and determination of a
particular designated scenic resource.
WIRELESS TELECOMMUNICATIONS - Any personal wireless services as defined in the
Federal Telecommunications Act of 1996 which includes FCC licensed commercial wireless
telecommunications services including but not limited to telecommunications services, radio or
television signals or any other spectrum-based transmissions/receptions, cellular, personal
communications services (PCS), specialized mobile radio (SMR), enhanced specialized mobile
35
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
radio (ESMR), paging, radio, television and similar services that currently exist or that may be
developed in the future.
WIRELESS TELECOMMUNICATIONS FACILITY (WTF) or "Facility" means any structure,
antenna, tower, or other device which provides radio/television transmission, commercial mobile
wireless services, unlicensed wireless services, cellular phone services, specialized mobile radio
communications (SMR), common carrier wireless exchange phone services,, common carrier
wireless exchange access services, and personal communications service (PCS), or pager
services.
WIRELESS TELECOMMUNICATIONS TOWER - see TOWER
Appendix A
Post Development Phosphorus Export by Watershed
Lake Name
DDA
ANAD
AAD
GF
D
F
WQC
LOP
C
P(1)
Little Pond
340
25
315
0.25
79
2.6
mod-sensitive
medium
1.00
0.033
Moose Pond
1153
100
1053
0.25
263
10.18
mod-sensitive
medium
1.00
0.0387
Pleasant Lake
2841
300
2541
0.35
889
55.89
outstanding
high
0.50
0.0314
Saturday Pond
835
70
765
0.25
191
9.17
mod-sensitive
high
0.75
0.036
Sebago Lake
11986
1000
10986
0.3
3296
357.69
outstanding
high
0.50
0.0543
Thompson Lake
8806
750
8056
0.3
2417
143.58
outstanding
high
0.50
0.0297
(1.)
The pounds per year of phosphorus from the watershed that would produce an increase in phosphorus
concentration by more than 1.0 parts per billion.
DDA
Direct land drainage area in Township in acres
ANAD
Area not available for development in acres
AAD
Area available for development in acres
GF
Growth factor
D
Area likely to be developed in acres
F
lbs. phosphorus allocated to towns share of watershed per ppb in lake
WQC
Water quality category
36
-Otisfield Wireless Telecommunications Facility Ordinance-
June 27, 2015
LOP
Level of protection
C
Acceptable increase in lake's phosphorus concentration in ppb
P
lbs. per acre phosphorus allocation (FC/D)
03.03.15-JAM
03.19.15 Revised-JAM
04.13.15 Revised-JAM
04.15.15 Revised-JAM
05.06.15-Revised-JAM
06.01.15-Revised-JAM
TAFT 07.22.15