Town of Penobscot Communications Tower Ordinance
Adopted 03/08/2011
Section 1. Ordinance Administration
A.
Title
This Ordinance shall be known as the "Town of Penobscot Communications
Tower Ordinance"
B.
Purpose
The purpose of this Ordinance is to balance the interests of the residents of the
Town of Penobscot with the needs of modern telecommunications providers and
their customers in the siting of telecommunications facilities within the town.
C.
Authority
This Ordinance has been prepared in accordance with the provisions of Article
VIII, Part 2, §1 of the Maine Constitution(Municipal Home Rule), the provisions
of 30-A, M.R.S.A. § 3001(Home Rule) and the provisions of the Planning
and Land Use Regulation Act, 30-A M.R.S.A. § 4312, etc. seq. (Comprehensive
Planning and Land Use Regulation, or "Growth Management Act") and 30-A
M.R.S.A. § 4452 ("Enforcement and Land Use Laws and Ordinances")
D.
Conflicts with Other Ordinances, Laws and Regulations
Whenever a provision of this Ordinance conflicts with or is inconsistent with
another provision of this Ordinance or of any other ordinance, regulation or
statute administered by the municipality, the more restrictive provision shall
control.
E.
Validity and Severability
Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the
Ordinance.
F.
Permitting Authority
The Planning Board shall review applications for wireless telecommunications
facilities.
F.
Applicability
This local land use Ordinance applies to all construction and expansion of
wireless telecommunications facilities, existing or proposed, within the Town of
Penobscot except as provided in Section 2. Wireless Telecommunications
Facilities shall be reviewed by the Planning Board.
G.
Effective Date
This Ordinance was adopted by the Municipal Legislative body on 03/08/2011.
2
H.
Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and
shall be accessible to any member of the public upon request. Copies shall be
made available to the public at reasonable cost at the expense of the person
making the request.
I.
Penalties
Any person or company that owns or controls any building, tower or property
connected with a wireless telecommunications system that violates this Ordinance
shall be penalized in accordance with 30 M.R.S.A. § 4452. Each day such a
violation continues after notification by the CEO shall constitute a separate
offense.
Section 2. Exemptions
The following are exempt from the provisions of this ordinance as long as the fall setback
distance from the property lines meets or exceeds one and one-half (1 ½) times the
height of the antenna and the individually listed restrictions on tower and antenna height
are followed.
A.
Emergency Wireless Telecommunications Facility: Temporary wireless
communication facilities for emergency communications by public agencies.
B.
Amateur (Ham) Radio Stations: Amateur (ham) radio station antennas licensed
by the Federal Communications Commission (FCC) which are under thirty-five
(35) feet high.
C.
Parabolic Antennas: Parabolic Antennas less than (7) seven feet in diameter,
that are an accessory use of the property under thirty-five (35) feet high.
D.
Routine repair and maintenance or repair: Routine maintenance or repair of a
wireless telecommunications facility and related equipment, provided that there is
no change in height or any other dimension of the facility.
E.
Temporary wireless telecommunication facility: Temporary wireless
telecommunications facility in operation for a maximum period of (180) one
hundred and eighty days. This may include, but is not limited to, "cellular on
wheels" mobile equipment. Prior written notification of the CEO and height
limited to 190 feet or less is required.
F.
Antennas as accessory uses: An antenna that is an accessory use to a residential
dwelling unit and is under thirty-five (35) feet high.
G.
"Special event" (see Definitions) wireless telecommunication facility:
Temporary special event telecommunication facilities for a period not to exceed
five days preceding an event and five days after a special event. The height is
restricted to one hundred ninety (190) feet or less.
H.
The DGPS Repeater Tower on Route 166, Federally owned.
Section 3. Review and Approval Authority
A.
Approval Required
No person shall construct, reconstruct or expand a wireless telecommunications
facility without approval of the Planning Board and notification of the CEO as
follows:
3
1. New Construction, Expansion of an Existing Facility. Approval by the
Planning Board is required for construction of a new wireless
telecommunications facility; and expansion of an existing wireless
telecommunications facility that increases the height or any other dimension of
the facility; and accessory use of an existing wireless telecommunications
facility
2. Reconstruction of an Existing Facility. Notification of the CEO is required
for reconstruction of a wireless telecommunications facility. Reconstruction is
allowed provided there is no change in the height or any other dimension of the
facility. Reconstruction is allowed only within (18) eighteen months of
damage, the full surety bond must be maintained during this time. After (18)
eighteen months, a new application and surety bond must be submitted or the
facility will be declared abandoned.
3. Expiration of Approved Applications. All site plan approvals shall expire
within (1) one year of the date of issuance unless work there-under is
substantially commenced. Substantial to mean at least 30% of the total value of
the project is to be completed. If work is not substantially completed within (2)
two years from the date of issuance, a new application must be made.
B.
Approval Authority
In accordance with Section 3A, above, the Planning Board shall review
applications for wireless telecommunications facilities, and make written findings
of fact on whether the proposed facility complies with this Ordinance.
Section 4. Requirements for All Applicants
A.
Pre-Application Conference
The Pre-application conference is not optional. All persons seeking approval of
the Planning Board under this ordinance shall meet with the CEO or Planning
Board, no less than (30) thirty days before filing an application.
At this meeting, the CEO or Planning Board shall explain to the applicant the
ordinance provisions, possible locations to avoid for tower sites (including areas
identified as Scenic Resources in the 1997 Comprehensive Plan) as well as
applications forms and submissions that will be required under this ordinance.
There is no fee for the Pre-Application Review, any review or comment by the
CEO is not binding upon either the CEO or the Planning Board. The use of this
procedure shall not render an application to be a pending application.
Section 5. Application for Planning Board Preliminary Review
All persons seeking review by the Planning Board under this ordinance shall
submit an application with the information as provided below. These materials
shall be contained in a bound report or a three-ring notebook.
A.
General Information:
1. Name of owner of record and address;
2. Applicant's name and address;
3. The name of the proposed development;
4
4. Names and addresses of all abutting property owners;
5. Sketch map showing general location of the site within the Town;
6. Location map showing the relationship of the proposed project to adjacent
properties and to the general surrounding area within three thousand + -
(3,000+ -) feet of any property line of the site. The scale shall not be
smaller than 1"=400'.
7. The tax map(s) and lot number(s) of the parcel or parcels where
the parcel is located and of abutting parcels;
8. A copy of the deed to the property, option to purchase the property or
other documentation to demonstrate the applicant's right, title, or interest
in the property upon which the facility is to be sited;
9. A statement stating whether any portion of the project is located
within the watershed of the Penobscot Water District; Type, location,
profile and cross-section of all existing surface water drainage.
10. The name(s), registration number(s), and seal(s) of the land surveyor,
architect, engineer and/or similar professionals assisting with the
preparation of the plan.
11. A copy of the FCC license for the facility, or a signed statement from the
owner or operator of the facility attesting that the facility complies with
current FCC regulations;
12. A USGS 7.5 minute topographic map showing the location of all structures
and wireless telecommunications facilities above one hundred fifty (150) feet
in height above ground level, except antennas located on roof tops, within a
five (5) mile radius of the proposed facility, unless this information has been
previously made available to the municipality. This requirement may be met
by submitting current information (within thirty (30) days of the date the
application is filed) from the FCC Tower Registration Database;
13. A schedule of construction, including anticipated beginning and completion
dates.
14. Projects involving the storing, generating or handling of hazardous wastes or
materials, oil or radioactive wastes shall specify the exact amount and nature
of all such substances that will be on the site and the specific method of
handling and containing those substances that will be used.
15. A yearly renewable bond indemnifying the town for 100 % of the costs of
removal of the facility as determined by the Planning Board shall be
submitted to the municipal authority before construction starts and
maintained yearly as long as the structure exists. Notice of renewal of the
bond shall be sent to the selectmen yearly by the owner or the bonding agent.
Should the bond not be renewed, the bonding company must give the Town
sixty (60) days notice of non-renewal and advise the Town of steps required
to renew the bond.
B.
Location Information-Mapping
1. The following information regarding proposed development and existing
conditions is required. This information must accompany, or be submitted
on, a map using the following scale and showing the date of the map,
magnetic north, the scale and the identity of the draftsman:
5
Acres
Scale
1-10
1"=10' to 1" = 50'
10-50
1"=50' to 1"=100'
50+(lots 4 acres)
1"=100'
50+(lots>4acres)
1"=200'
2. Zoning classification(s) of the property and the location of zoning district
boundaries if the property is wholly or partially located in an area subject
to Shoreland Zoning.
3. Identification of districts, sites, buildings, structures or objects, significant
in American History, architecture, archaeology, engineering or culture, that
are listed, or eligible for listing, in the National Register of Historic Places
4. A site plan prepared and certified by a professional engineer registered in
the State of Maine, indicating the location, type and height of the proposed
facility, antenna capacity, on-site and abutting off-site land uses, means of
access, setbacks from property lines, and all applicable American National
Standards Institute (ANSI) technical and structural codes.
5. Certification by the applicant that the proposed facility complies with all
FCC standards for radio emissions is required.
6. A boundary survey for the project performed by a licensed professional
surveyor licensed by the State of Maine. The bearings and distance of all
property lines of the property to be developed and the source of this
information shall be on the map.
7. A copy of such covenants or deed restrictions, if any, as are intended to
cover all or part of the site. Such covenants or deed restrictions shall be
referenced on the plan.
8. A survey of the lessor's or current owner's entire property shall be presented.
The applicant may request and the Planning Board may consent to a survey of
the entire property in the form of a mortgage loan inspection sketch, including
information requested by the Planning Board.
9. Location and size of all existing and proposed wells, sewer and water mains,
culverts, drains, above or below ground utilities and waste water disposal
systems on the property to be developed, and of any of these items that
currently serves or will serve the development from abutting streets.
10. Location, names, and widths of all existing and proposed streets and rights-
of-way adjacent to the proposed development.
11. The location, dimensions, and ground floor elevations of all existing and
proposed buildings on the site.
12. The location and dimensions of all existing and proposed driveways, streets,
parking and loading areas, and walkways on the site.
13. The existing and proposed topography of the site at an appropriate contour
interval (not greater than 5') depending on the nature of the use and
character of the site.
14. Major natural features on the site and including, within two hundred fifty
(250') feet of the boundaries of the site, wetlands, streams, ponds, flood
plains, groundwater aquifers, significant wildlife habitats (including bird
nesting, staging and feeding areas, and deer yards identified by the IF&W),
archaeological resources or other important natural features.
15. The delineation of all the fall zones, one and a half (1 ½) times the height of
6
the tower from existing and proposed buildings, yards, property lines and
buffers required by this Ordinance shall be shown on the applicant's plan.
C.
Location Information- Soils and Erosion Control
1. Soils information if on-site sewage disposal is proposed. This information
should be detailed enough to allow those portions of the site not suitable for
on-site disposal systems to be identified, if applicable.
2. The direction and amount of pre-development and proposed surface water
drainage flow across and from the site, based upon 24-hour, 2-10-and 25-year
storms. Where proposed flow exceeds pre-development flows by 10% or
more, the applicant shall submit a storm-water management plan, showing
the steps taken to minimize the impact of storm water runoff. The storm
water management plan shall be based upon 24-hour, 2-,10- and 25-year storms.
3. An erosion control and sedimentation control plan shall be included which sets
forth the measures to be taken to comply with BMP's in Maine Erosion and
Sedimentation Control Laws M.R.S.A. 420-C and all other applicable
Environmental Laws pertaining to erosion and sedimentation control.
D.
Location Information- Visual Impact
1. The location, front view, dimensions and type of all existing and proposed
exterior signs.
2. A visual assessment consisting of the following:
a.)Elevation drawings of the proposed facility, and any other proposed
structures, showing height above ground level;
b.)A landscaping plan indicating the proposed placement of the facility on
the site: location of existing structures, trees and other significant
features; the type and location of plants proposed to screen the facility;
the method of fencing, the color of the structure, and the proposed
lighting method.
c.) Photo simulations of the proposed facility taken from perspectives
determined by the Planning Board, or their designee. Each photo must
be labeled with the line of sight, elevation, and with the date taken
imprinted on the photograph. The photos must show the color of the
facility and method of screening.
d.) A narrative discussing the extent to which the proposed facility would
be visible from or within a designated scenic resource. The tree line
elevation of vegetation within 100 feet of the facility, and the distance
to the proposed facility from the designated scenic resource's noted
viewpoints.
E.
Location Information- Propagation Studies
1. Propagation studies of areas already covered by telecommunication facilities as
well as areas proposed to be covered by the applicant.
2. A written description of how the proposed facility fits into the applicant's
telecommunications network. This submission requirement does not require
disclosure of confidential business information.
3. Certification by the applicant that the proposed facility complies with all FCC
standards for radio emissions is required.
7
4. Evidence demonstrating that no existing building, site, or structure can
accommodate the applicant's proposed facility, the evidence for which, may
consist of any one of the following:
a.) Evidence that no existing facilities are located within the targeted
market coverage area as required to meet the applicant's engineering
requirements.
b.) Evidence that existing facilities do not have sufficient height or cannot
be increased in height at a reasonable cost to meet the applicant's
engineering requirements up to the limit of 190 feet.
c.) Evidence that existing facilities do not have sufficient structural
strength to support the applicant's proposed antenna and related
equipment. Specifically:
i.) Planned, necessary equipment would exceed the structural
capacity of the existing facility, considering the existing and
planned use of those facilities, and these existing facilities
cannot be reinforced to accommodate the new equipment.
ii.)The applicant's proposed antenna or equipment would cause
electromagnetic interference with the antenna on the existing
towers or structures, or the antenna or equipment on the existing
facility would cause interference with the applicant's proposed
antenna.
iii.)Existing or approved facilities do not have space on which
planned equipment can be placed so it can function effectively.
d.) For facilities existing prior to the effective date of this ordinance, there
is evidence that the fees, costs, or contractual provisions required by
the owner in order to share, or adapt an existing facility are
unreasonable. Costs exceeding the pro rata share of a new facility
development are presumed to be unreasonable. This evidence shall
also be satisfactory for a tower built after the passage of this ordinance.
e.) Evidence that the applicant has made diligent good faith efforts to
negotiate co-location on an existing facility, building, or structure, and
has been denied access.
F.
Location Information - Submission Waivers
1. The Planning Board, as appropriate, may waive any of the submission
requirements based upon a written list of requested waivers submitted by the
applicant at the time of application, accompanied by the written reasons why
each waiver is being requested.
2. A waiver of any submission requirement may be granted only if the Planning
Board finds in writing that due to special circumstances of the application, the
information is not required to determine compliance with the standards of the
Ordinance.
Section 6. Fees, Public Hearing & Final Application Review Procedure
A.
Permit Application Fee
1. An application for Planning Board approval shall include payment of a permit
application fee of $0.20 per square foot of total area fenced compound. Each
8
accessory building requires a minimum fee of $500.00. The application shall
not be considered complete until this fee is paid. An applicant is entitled to a
refund of the application portion of the fee if the application is withdrawn
within fifteen(15) days of the date of filing.
B.
Planning Board Review Fee (held in Escrow)
1. An applicant requesting approval by the Planning Board shall deposit with the
Town a $5000.00 fee to cover all reasonable and customary fees incurred by
the municipality that are necessary to review the application and to obtain the
permit. Additional monies shall be required to cover Town expenses in the
event of an appeal. The review fee shall be paid at the time of application.
2. This Review Fee shall be held in Escrow. That portion of the review fee not
used shall be returned to the applicant within thirty (30) days of the Planning
Board's final decision.
C.
Application Procedure
1.
Filing the Application & Fees
Nine (9) copies of the application shall be filed with the CEO or Planning
Board two (2) weeks prior to the scheduled meeting for review. The
application shall be accompanied by the Permit Application Fees (Section
6A1) and the Planning Board Review Fee (Section 6B1).
2.
Planning Board Preliminary Review
Within forty-five (45) days of the filing of the application, the Planning
Board shall review the application and determine if the application meets
the submission requirements. The Planning Board, as appropriate, shall
review any written requests for a waiver from the submission requirements
and shall act on these requests prior to determining the completeness of
the application.
3.
Complete Application
If the application is complete, the Planning Board shall notify the
applicant in writing of this determination, or if the application is
incomplete, the Planning Board shall notify the applicant in writing,
specifying the additional materials or information required to complete the
application. After the Planning Board has determined that a complete
application has been filed, and has notified the applicant in writing of
such, it will begin the review process of the proposed development.
4.
Public Hearing & Abutter's Notices
The Planning Board will hold a Public Hearing within 30 days of the filing
of the completed application. The CEO or the Planning Board shall
publish the time, date and place of the hearing at least one (1)time at least
seven (7)days prior to the hearing in a newspaper of area-wide circulation.
The applicant must supply to the Board a list of the abutting land owners.
The abutting land-owners shall be notified by certified mail by the Code
Enforcement Officer of the hearing. Failure on the part of any abutter to
receive such notice shall not be grounds for delay of any consideration of
the application nor denial of the project.
9
5.
Final Planning Board Review
Within thirty (30) days of the Public Hearing or sixty (60) days of
receiving a complete application for approval, the Planning Board shall
either approve, approve with conditions, or deny the application in
writing, together with the findings on which that decision is based. The
time limit for review may be extended by mutual agreement between the
Planning Board and the applicant.
Section 7. Planning Board Review Standards
An application for approval by the Planning Board for New Construction or Expansion of
an Existing Facility must meet the following standards:
A.
Designed for Co-Location
A new wireless telecommunications facility and related equipment must be
designed and constructed to accommodate expansion for future co-location of at
least three additional wireless telecommunications facilities or providers at
commercially reasonable rental rates which will be subject to review and approval
of the Planning Board.
B.
Height
A wireless telecommunications facility must be no more than one hundred
ninety (190) feet in height.
C.
Setbacks
A new or expanded wireless telecommunications facility must be set back
one and one half (1 ½ ) times it's height, measured from the outer edge of the
fence, from all property lines The setback may be satisfied by including the areas
outside the property boundaries if secured by an easement. The height of the
tower shall be measured from the base of the Tower.
D.
Minimum Lot Size
A new or expanded wireless telecommunications facility and related equipment
must meet the minimum lot size requirements as stated in the Penobscot Land Use
Ordinance, currently Section 10G (12).
E.
Landscaping
A new wireless telecommunications facility and related equipment must be
screened with plants from view by abutting properties, to the maximum extent
practicable. Existing plants and natural land forms on the site shall also be
preserved to the maximum extent practicable.
F.
Fencing
A new wireless telecommunications facility must be fenced to discourage
trespass on the facility and to discourage climbing on any structure by
trespassers. The fence must encircle the entire facility.
G.
Lighting
A new wireless telecommunications facility must be illuminated only as necessary
to comply with FAA or other applicable state and federal requirements.
H.
Color and Materials
A new wireless telecommunications facility must be constructed with materials
and colors that match or blend with the surrounding natural or built environment,
to the maximum extent practicable. Unless otherwise required, muted colors,
earth tones, and subdued hues shall be used.
10
I.
Structural Standards
A new wireless telecommunications facility must comply with the current
Electronic Industries Association/Telecommunications Industries Association
(EIZ/TIA) 222 Revision Standard entitled "Structural Standards for Steel Antenna
Towers and Antenna Supporting Structures," and with Hancock County Standards
for wind shear and ice load.
J.
Visual Impact
The proposed wireless telecommunications facility will have no unreasonable
adverse impact upon designated scenic resources as identified in the
Comprehensive Plan or by a State or Federal Agency.
1. In determining the potential unreasonable adverse impact of the
proposed facility upon the designated scenic resources, the Planning
Board shall consider the following criteria:
a.) The extent to which the proposed wireless telecommunications
facility is visible above the tree line from viewpoints of the
impacted designated scenic resource.
b.) The type, number, height and proximity of existing structures and
features, and background features within the same line of sight as
the proposed facility.
c.) The amount of vegetative screening.
d.) The distance of the proposed facility from viewpoints and the
facility's location within the designated scenic resource.
e.) The presence of reasonable alternatives that allow the facility to
function consistently with its purpose.
K.
Historic & Archeological Properties
The proposed facility, to the greatest degree practicable, will have no
unreasonable adverse impact upon an historic district, site or structure which is
currently listed or eligible for listing on the National Register of Historic Places.
Section 8. Standard Conditions of Approval
A.
Land Use Ordinance of the Town of Penobscot
An approved project must meet the Land Use Standards in the Land Use
Ordinance of the Town of Penobscot in addition to satisfying all the following
review criteria in this Communications Tower Ordinance.
B.
Amendment to an Approved Application
Any changes to an approved application must be approved by the Planning Board,
in accordance with Section 3.
C.
Abandonment
1. A wireless telecommunications facility that is not operated for a continuous
period of twelve (12) months shall be considered abandoned. The CEO shall
notify the owner of an abandoned facility in writing and order the removal of
the facility within ninety (90) days of receipt of the written notice. The owner
of the facility shall have thirty (30) days from receipt of the notice to
demonstrate to the CEO that the facility has not been abandoned. If the owner
fails to show that the facility is in active operation, the
owner shall have sixty (60) days to remove the facility. If the facility is not
removed within this time period, the municipality may remove the facility at
the owner's expense. The owner of the facility shall pay all site reclamation
11
costs deemed necessary and reasonable to return the site to its pre-construction
condition, including the removal of roads, and re-establishment of vegetation.
2. The owner of the facility may apply to the Planning Board for release of the
surety bond when the facility and related equipment are removed to the
satisfaction of the Planning Board.
3. If the bond is to be cancelled or reduced, the bonding agent must directly
notify the CEO and the Selectmen. The Selectmen shall review the surety
bond annually.
D.
Co-Location As a condition of approval, the owner of the wireless
telecommunications facility, his or her successors and assigns agree to:
1. Respond in a timely, comprehensive manner to a request for information
from a potential co-location applicant, in exchange for a reasonable fee not in
excess of the actual cost of preparing a response.
2. Negotiate in good faith for shared use of the wireless telecommunications
facility by third parties;
3. Allow shared use of the wireless telecommunications facility if an applicant
agrees in writing to pay reasonable charges for co-location.
4. Require no more than a reasonable charge for shared use of the wireless
telecommunications facility, based on community rates and generally
accepted accounting principles. This charge may include, but is not limited
to, a pro rata share of the cost of site selection, planning project administration,
land costs, site design, construction and maintenance, financing, return on
equity, depreciation, and all of the costs of adapting the tower or equipment to
accommodate a shared user without causing electromagnetic interference. The
amortization of the above costs by the facility owner shall be accomplished at
a reasonable rate, over the life span of the useful life of the
telecommunications facility.
E.
Emissions As a further condition of approval, and upon request by the Town,
the applicant shall, at various times, while the wireless telecommunications
facility is in operation, certify to the Town that it is in full compliance with all
applicable FCC radio frequency emissions regulations.
Section 9. Appeals
Any person aggrieved by a decision of the Planning Board on a Communications Tower
application may appeal the decision to the Maine Superior Court in accordance with Rule
80(B), Maine Rules of Civil Procedure. Written notice of an appeal must be filed with
the court within thirty (30) days of the Planning Board's written decision. The applicant's
notice of appeal shall clearly state the reasons for the appeal.
Section 10. Administration and Enforcement
A.
The CEO, as appointed by the Board of Selectmen, shall enforce this ordinance.
If the CEO finds that any provision of this ordinance has been violated, the CEO
shall notify in writing, the person responsible for such violation, indicating the
nature of the violation, and ordering the action necessary to correct it. The CEO
shall order correction of the violation and may take any other legal action to
ensure compliance with this ordinance.
12
B.
The Board of Selectmen is authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this ordinance and
recovering fines without court action. Such agreements shall not allow a violation
of this ordinance to continue unless there is clear and convincing evidence that the
violation occurred as a direct result of erroneous advice given by an authorized
municipal official upon which the applicant reasonably relied to its detriment and
there is no evidence that the owner acted in bad faith. The removal of the
violation will not result in a threat to public health and safety or substantial
environmental damage.
Section 11. Definitions
Antenna - A system of poles, panels, rods, reflecting discs or similar devices used for
the transmission or reception of radio or electromagnetic frequency signals.
Antenna Height - The vertical distance measured from the base of the antenna support
structure at grade to the highest point of the structure, even if said highest point is an
antenna. Measurement of tower height shall include antenna, base pad, and other
appurtenances and shall be measured from the finished grade of the facility site. If the
support structure is on a sloped grade, then the average between the highest and lowest
grades shall be used in calculating the antenna height.
Co-Location - The use of a wireless telecommunications facility by more than one
wireless telecommunications provider.
Designated Scenic Resource - The specific location, view or corridor, as identified as a
scenic resource in a municipally adopted comprehensive plan or by a State or Federal
agency that consists of:
1. A three dimensional area extending out from a particular viewpoint on a public way or
within a public recreational area, focusing on a single object, such as a mountain,
resulting in a narrow corridor, or a group of objects, such as a downtown skyline or
mountain range.
2. Lateral terrain features such as valley sides or woodland as observed to either side of
the observer, constraining the view into a narrow or particular field, as seen from a
viewpoint on a public way or within a public recreational area.
Expansion - The addition of antennas, towers or other devices to an existing structure.
FAA - Federal Aviation Administration
Fall Setback - The distance measured from the wireless communications facility fence,
which encircles the entire facility.
FCC - Federal Communications Commission, or its lawful successor.
Height - The vertical measurement from a point on the ground at the mean finish grade
adjoining the foundation as calculated by averaging the highest and lowest finished grade
around the building or structure, to the highest point of the tower structure, not to exceed
190 feet. The highest point shall exclude farm building components, flagpoles
chimneys, ventilators, skylights, domes, water towers, bell towers, church spires,
processing towers, tanks, bulkheads, or other building accessory features usually erected
at a height greater than the main roofs of buildings.
Historic or Archeological Resources - Resources that are:
1. Listed individually in the National Register of Historic Places or eligible for listing on
the National Register;
13
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to
the historical significance of a registered historic district or a district preliminarily
determined by the Secretary of the Interior to qualify as a registered historic district.
3. Individually listed on a state inventory of historic places in states with historic
preservation programs approved by the Secretary of the Interior.
4. Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified by Secretary of the Interior through the
Maine Historic Preservation Commission
5. Areas identified by a government agency such as the Maine Historic Preservation
Commission as having significant value as an historic or archaeological resource.
Historic Landmark - Any improvement, building or structure of particular historic or
archeological significance to the Town relating to its heritage, cultural, social, economic
or political history, or which exemplifies historic personages or important events in local,
state, or national history identified in the municipality's comprehensive plan, which have
been listed or are eligible to be listed on the National Register of Historic Places.
Line of sight - The direct view of the object from the designated scenic resource.
Parabolic antenna - (also know as a satellite dish antenna) An antenna which is bowl-
shaped, designed for the reception and or transmission of radio frequency communication
signals in a specific directional pattern.)
Principal Use - The use other than one which is wholly incidental or accessory to
another use on the same premises.
Public Recreational Facility - A regionally or locally significant facility, as defined and
identified either by State statute or in the municipality's adopted comprehensive plan,
designed to serve the recreational needs of municipal property owners.
Special Event - A rare and unpredicted event.
Substantial Start - The completion of thirty percent (30%) of a structure or use
measured as a percentage of estimated total cost.
Targeted Market Coverage Area - The area which is targeted to be served by this
proposed telecommunications facility.
Unreasonable Adverse Impact - The proposed project would produce an end result
which is :
1. Excessively out of character with the designated scenic resources affected, including
existing building structures and features within the designated scenic resource, and
2. Would significantly diminish the scenic value of the designated scenic resource.
Viewpoint - That location which is identified either in the municipally adopted
comprehensive plan or by a Federal or State agency , and which serves as the basis for
the location and determination of a particular designated scenic resource.
Wireless Telecommunications Facility or Facilities - Any structure, antenna, tower,
or other device which provides radio/television, commercial mobile wireless services,
unlicensed wireless services, cellular phone services, specialized mobile radio
communications (SMR), common carrier wireless exchange access services, and personal
communications service (PCS) or pager services., or any kind of wireless communication
transmissions.