Town of Phillips
COMMERICIAL
SOLAR ENERGY SYSTEMS
ORDINANCE
Definitions
Applicant - The person or entity submitting an application and seeking approval under this
ordinance, the owner of a Solar Energy System or a proposed Solar Energy System project; the
operator of a Solar Energy System or a proposed Solar Energy System project, any person acting,
on behalf of an applicant, Solar Energy System or proposed Solar Energy System. Whenever the
term "applicant" or "owner" or "operator" is used in this ordinance, said term shall include any
person acting as an applicant, owner or operator or successor operator of such Solar Energy
System.
CEO - Code Enforcement Officer
CSES - Commercial Solar Energy Systems
Permit - Written permission issued by the Town of Phillips, empowering the holder thereof to
construct a facility in accordance with this Ordinance
Permittee - Any person or organization to whom a permit, as it pertains to this Ordinance, is
issued.
Project Boundary - The boundaries of the Solar Energy System which the Owner/Operator has
legal right or interest or the option to acquire the same as shown on the site plan submitted to
and approved by the Planning Board in accordance with this Ordinance.
Project Parcel - Any parcel(s) of real estate on which all or any part of a SES (Solar Energy
System) will be constructed.
Property Line - The imaginary line along the ground surface and the vertical extension of
that line constitutes a legally enforceable boundary which separates real property owned
or controlled by owner(s) from contiguous real property owned or controlled by another
person.
RSES - Residential Solar Energy Systems for personal use. These systems are exempt from
requiring a permit.
SES - Solar Energy System
Setback Area - The entire land base that falls within the Setback for a SES.
Shade Management / Solar Corridors - The selective cutting/trimming of vegetation to allow
sunlight corridors into actual solar panel areas.
Solar Collector - A solar PV cell, panel, array or solar thermal collector device that relies
upon solar radiation as an energy source for the generation of electricity or transfer of
stored heat. ;
Solar Energy System, Ac2ve - a solar energy system whose primary purpose is to harvest
energy by transforming solar energy into another form of energy or transferring heat froma
3
A. TITLE
This Ordinance shall be known and may be cited as the "Phillips Commercial Solar
Energy Systems Ordinance" and will be referred to herein as the "Ordinance".
B. AUTHORITY
This Ordinance is adopted pursuant to Home Rule Powers as provided for in Article
VIII of the Maine Constitution.
C. PURPOSES
1. The Town of Phillips finds that it is in the public interest to encourage the
development and use of Solar Energy Systems as a clean, renewable energy
source and to help promote sustainable initiatives in town.
2. The purpose of the Ordinance is to facilitate the effective and efficient use of Solar
Energy Systems while protecting the public health, safety and welfare of Phillips
citizens.
D. APPLICABILITY
1. The provisions of this Ordinance shall apply to Solar Energy Systems as defined by
this Ordinance and by Title 33, Chapter 28-A, MRSA, Section 1421, 1423, within the
boundaries of the Town of Phillips.
2. The requirements of this Ordinance shall apply to all medium, and large-scale
Solar Energy Systems modified or installed, upon adoption by the Town.
Residential Solar Energy Systems are exempt.
3, All Solar Energy systems shall be designed, erected and installed in
accordance with all applicable local, state and federal codes, regulations and
standards.
4, Any modification, upgrade or structural change that materially alters the size,
placement or output of an existing Solar Energy System shall comply with this
ordinance.
E. CONFLICT WITH OTHER ORDINANCES
Whenever the requirements of this Ordinance are in conflict with the requirements of
any other lawfully adopted rule, regulation, Ordinance, deed restriction or covenant, the
more restrictive or higher standard covenant shall govern, unless otherwise prohibited
by State Law.
F. SEVERABILITY
In the event that any section, subsection or provision of this Ordinance shall be declared
by any court or competent jurisdiction to be invalid for any reason, such decision shall
not be deemed to affect the validity of any other section, subsection or other portion of
this Ordinance, to this end, the provisions of this Ordinance are hereby declared to be
5
submission of a sketch plan to cover planning review costs performed by the
contract planner and Town staff, in accordance with the fee schedule established by
the Town Select Board. If the balance in this account is drawn down by 75%, the
Board shall notify the applicant and require that an additional amount equal to the
original fee be deposited by the applicant. The Board shall continue to notify the
applicant for additional amounts as necessary whenever the balance of the account
is drawn down by 75% of the original deposit. Any unused funds will be returned
to the Applicant following Planning Board determination.
5, Any permit issued pursuant to this ordinance is personal to the permittee and
shall not be transferred, assigned, or conveyed to any other person or entity. Any
subsequent owner or operator shall be required to submit a new application
pursuant to this ordinance.
J. SUBMITTAL REQUIREMENTS FOR SITE PLAN REVIEW OF SOLAR ENERGY
SYSTEMS
The following information shall be submitted with a Site Plan Application for a review
of a solar energy system and associated facilities under this ordinance.
1. A narrative describing the proposed solar energy system, including an overview of
the project; the project location; the generating capacity of the solar energy system,
dimensions of all components and respective manufacturers; and a description of
associated facilities and how the system and associated facilities comply with the
standards of this ordinance (including a plan or other graphics that demonstrate
compliance). Where systems are proposed in the front part of the site, the
application shall include technical documentation as to why it is not possible to
locate the system to the side or rear of the site.
2. Anaccurate scaled site plan of the subject property showing the planned location
of the proposed energy system and all associated facilities, property lines,
adjoining streets and access, topographic contour lines, existing and proposed
buildings, fencing, structures, potential shade from nearby trees and structures,
vegetation, driveways, parking and curb cuts on the subject property; and
specification for all proposed electrical cabling/ transmission lines, accessory
equipment and landscaping.
3, Ascaled elevation drawing showing the proposed solar energy system and all
proposed structures, foundations, supports, fencing, vegetation and landscaping,
indicating the size, color and materials of the system. Drawings of structures and
foundations shall be stamped by a licensed Professional Engineer.
4. Information on any proposed connections to the grid including any proposed off-
site modifications to provide grid connections, access the installation or to
maintain proposed solar energy system and grid connections.
5. Inthe case of medium and large ground mounted solar energy systems, the
applicant shall provide Operations and Maintenance Plan, including site control and
the projected operating life of the system, prepared and stamped by a licensed
7
of the SES shall be 100 Ft. Setback from any dwelling or accessory building
located on another parcel shall be 400 Ft.
d) Lot coverage/calculating medium or large solar energy systems shall not be
more than 25% of all acreage on that site and the remaining land cannot be
used for any other tax reducing, i.e. tree growth, homesteading projects.
e) Inorder to prevent circumvention of the size and coverage restrictions, the lot or
parcel will be considered to be the largest configuration of physical area that
existed as a lot or parcel within the 5 years immediately preceding the application.
f} Lease arrangements may not be used to circumvent size and coverage
restrictions such that the parcel exceeds 25% of the original parcel.
L. STANDARDS FOR APPROVAL OF BUILDING INTEGRATED, BUILDING
MOUNTED PHOTOVOLTAIC, ROOF MOUNTED AND GROUND MOUNTED
SOLAR ENERGY SYSTEMS.
1. All wiring must comply with the National Electrical Code, most recent edition,
prior to operation, electrical connections must be inspected by a licensed
electrician, hired by the applicant and reviewed by the Code Enforcement Officer
or their designee.
2. Any connection to the public utility grid must be inspected by the appropriate
public utility unless waived by the public utility.
3. Roof mounted and building mounted solar collectors shall meet all applicable fire
safety and building code standards.
4. No solar panels or other solar energy equipment used in any solar energy system
shall utilize or contain any amount of GenX chemicals or polyfluoroalkyl substances
(PFAS).
M. STANDARDS FOR APPROVAL OF MEDIUM AND LARGE SCALE
GROUND MOUNTED SOLAR ENERGY SYSTEMS.
The Application meets the Review Standards contained within this Ordinance.
1, Site Access: Access to the site will not cause highway or public road congestion or
unsafe conditions. Vehicular access to the site shall be on roads which have
adequate capacity to accommodate the additional traffic generated by the
development.
2. Preservation of Landscape: The landscape has been preserved in its natural state,
insofar as practicable, by minimizing tree and soil removal, retaining existing
vegetation where possible and keeping any grade changes in character with the
general appearance of neighboring areas.
3. Preservation of Natural Features: Will not have an undue adverse effect on the
scenic or natural beauty of the area, aesthetics, historic sites, significant wildlife
habitat identified by the Department of Inland Fisheries and Wildlife or
2
10, Utilities: All utility installations will be located so as not to be unsightly or
hazardous to the public and will be landscaped or otherwise buffered so as to
screen the components from public view.
11. Site Lighting: Lighting, if applicable, will be controlled in both height and
intensity to maintain rural character of the Town. The light source proposed is
"dark skies compliant" and down mounted / shielded to prevent it from shining
directly onto neighboring properties
12, Air Glare Protection: Solar Panels are anti-reflective materials (abbreviated by the
Federal Aviation Administration (FAA) as "AR"). The Applicant has notified area
airports and the FAA for their review and two (2) week comment period. Copies of
all correspondence have been provided to the Town.
13. Air Pollution: The Application will not result in undue air pollution. The air
pollution regulations of the Maine Department of Environmental Protection
will remain in effect. The Application includes a statement of compliance with
MDEP regulations.
14. Dust, Fumes, Vapors, Gases and Odors: The development will not produce
harmful, offensive or bothersome odors, scents, or aromas that will be perceptible
beyond their lot lines, either at ground or habitable elevation. Will not cause
noise, odor, glare or vibration to disturb the peaceful enjoyment of adjacent
property.
15. Water Supply: Has sufficient water available for the reasonably foreseeable
needs of the proposed use including fire protection.
16. Water Quality: The development will not lower the existing water quality of
on-site or adjacent rivers, streams, brooks, wetlands, ponds, lakes, or
groundwater. Adequate
provision have been made for the storage and disposal of any hazardous or
potentially harmful materials which may impact water quality. Will not, alone or
in conjunction with existing activities, adversely affect the quality or quantity of
ground water.
17. Sewage Disposal: Sewage will be disposed in conformity with laws and rules of
the Maine Department of Environmental Protection, and/or the State Plumbing
Code and other applicable regulations.
18. Waste Disposal: Adequate provisions have been made for the disposal of all
solid and liquid wastes on a timely basis and in an environmentally safe
manner.
19. End of Life - Site Restoration Plan: The proposal includes an acceptable "End of
Life - Site Restoration Plan and Narrative" which complies with the regulations
and intent of the Ordinance. See Decommissioning and Removal.
11
1. The amount of the guarantee shall be equal to 125% of the estimated removal
cost, provided by the applicant and certified by a Professional Civil Engineer
licensed in Maine every five (5) years from the date of the Planning Board's
approval of the Solar Energy System.
2, If the cost has increased more than fifteen (15) percent, then the owner of the
facility shall provide additional security such that the guarantee shall remain equal
to 125% of the estimated removal cost. The applicant may also request adjustments
in the guarantee.
3, Incase of a leasing arrangement the operator shall be responsible for the guarantee.
P. TYPES AND CONTENTS OF GUARANTEE
One of the following performance guarantees chosen by the applicant shall be provided
on approval of application.
1. Interest-bearing Escrow Account - A cash contribution equal to 125% of the
estimated removal cost for the establishment of an escrow account shall be made
by either a certified check made out to the Town of Phillips, direct deposit into a
savings account or purchase of a certificate of deposit.
2. For any account opened by the applicant, the Town shall be named as owner or
co-owner and consent of the Town shall be required for withdrawal.
3, Any interest earned on the escrow account shall be returned to the applicant
unless the Town has found it necessary to draw on the account, in which case the
interest shall be proportionately divided between the amount returned to the
applicant and the amount withdrawn to complete the required work.
Q. DECOMMISSIONING AND REMOVAL
1, Any ground mounted solar energy system that has reached the end of its useful life,
ceases to generate power or has been abandoned shall be removed pursuant toa
plan approved by the Phillips Planning Board during the application process. The
applicant/owner of the facility shall physically remove the installation no more than
180 days after the date of discontinued operations. The applicant/owner of the
facility shall notify the Code Enforcement Officer by certified mail, return receipt
requested, of the proposed date of the discontinued operations and plans for
removal.
2. If the owner or operator of a ground mounted solar energy system fails to remove
the installation in accordance with the requirements of this section within 180 days
of abandonment or the proposed date of decommissioning, the Town of Phillips
retains the right to use the performance guarantee and any and all legal or available
means necessary to cause an abandoned, hazardous or decommissioned solar
energy system to be removed.
13
S. EFFECTIVE DATE AND DURATION
This Ordinance shall take effect upon enactment by the Town of Phillips unless
otherwise provided and shall remain in effect until it is amended or repealed.
T. ENFORCEMENT VIOLATIONS AND PENALTIES
This Ordinance shall be enforced by the municipal officers or their designee. Violation of
this Ordinance shall be subject to the enforcement and penalty provisions of 30-A,
M.RS. 4453, Enforcement of Land Use Laws and Ordinances.
U. INTERPRETATION AND PERFORMANCE
The interpretation and performance of this ordinance shall be governed by the laws of
the State of Maine and the Town of Phillips. Any general rule of construction to the
contrary notwithstanding, this ordinance shall be liberally construed to effectuate its
intent, policies, and purposes of cooperation, not competition. If any provision of this
ordinance is found to be ambiguous, such ambiguity or loophole shall be resolved in a
manner consistent with the intent and purposes of this ordinance.
Validation:
| CL Senet White
Select Board Chair, signature print name
Select Board Vice\Chair, signature print name
fbi vA chow
Séfect Board Member, signature print name
WV dante TY ee Nieok Leves@ue
Select Board Member, signature print name /
Select Board Member, signature print name
Attest:
Ee Pc Vas Date: Juse 2% 302
Town ere | :
Printed name :
15
Pe)