TOWN OF PROSPECT, MAINE
ee
MINING ORDINANCE
Enacted $ /: eZ, hr 7
Certification of Proposed Ordinances by the Municipal Officers
This certifies to the municipal clerk of Prospect that the within ordinance is a true copy of an ordinance
entitled Mining Ordinance to be acted upon the voters at a Town Meeting to be held on _ // 3 ofl 4
atear 11 G I q Municipal Officers of Prospect
Attested By: As Edy Prospect Town Clerk
ad ph
~y =i
1
: .
a F
7?
Lt aa |
Contents
ARTICLE | -- TITLE & PURPOSE1
ARTICLE Il -- ACTIVITIES EXEMPT FROM THIS ORDINANCE1
ARTICLE II|-- AUTHORITY, APPLICABILITY & ADMINISTRATION2
ARTICLE IV -- MINERAL EXTRACTION APPLICATION REVIEW3
ARTICLE V -- MINIMUM DESIGN & PERFORMANCE STANDARDS6
ARTICLE VI -- ENFORCEMENT AND INSPECTIONS.13
ARTICLE Vil -- SEVERABILITY & CONFLICT15
ARTICLE Vill- AMENDMENTS TO THE ORDINANCE15
ARTICLE IX --REFERENCES & DEFINITIONS16
ARTICLE | -- TITLE & PURPOSE
§ 1 Title
This Ordinance shall be known and may be cited as the Town of Prospect Surface and Subsurface
Mineral Extraction Ordinance, or by its short title of Town of Prospect Mining Ordinance and will be
referred to herein as "this Ordinance."
§2 Purpose
The purpose of this Ordinance is to put into law standards and procedures intended to regulate the
removal, processing and storage of topsoil, loam, rock, flat rock, sand, gravel, or other similar materials.
These standards and procedures are intended to protect the public health, safety, and general welfare, and
to minimize the adverse impact of extraction to the Town, abutting property owners, citizens of the Town,
and wildlife and natural resources by:
A. Preserving and protecting surface and groundwater quality and quantity for current and
future use of the town and/or its residents.
B. Preserving the value of property and its future ability to be an asset to the town and its
residents, including wildlife habitat and scenic qualities.
ARTICLE Il -- ACTIVITIES EXEMPT FROM THIS ORDINANCE
$1 This ordinance shall not apply to the following:
(NOTE: Mineral extraction activities which are exempt from this Ordinance may require approval
pursuant to the Shoreland Zoning Ordinance and must comply with all other rules and regulations of the
Town.]
A. Active extraction operations with valid State permits existing on the date of enactment
are excluded.
B. Mineral extraction activities not exceeding 20,000 square feet of surface area, or the
removal or handling of tess than 1,000 cubic yard of material annually, if it is for the
personal use of the property owner and not sold.
C, Storage or Stockpiles of winter abrasives (sand) used for the maintenance of private or
public roads. This applies to the stockpile or storage area itself and not any associated
mineral extraction activity or area;
1
D. Removal or filling of material reasonably incidental to construction, alteration or repair
of a structure, or in the landscaping incidental thereto;
E. Construction of farm and fire ponds and normal agricultural operations;
F, Inactive areas where previous mining last occurred at feast 12 months prior to the
adoption of this Ordinance;
G. Removal of stone walls, rock walls, or foundation walls; and
H. Stripping of topsoil (loam) not part of a mineral extraction operation to a depth no greater
than one foot, provided the area so stripped is reseeded in the same growing season as
removal:
ARTICLE ill -- AUTHORITY, APPLICABILITY & ADMINISTRATION
§1 Effective Date
This Ordinance shall be effective upon its adoption by vote of the eligible voters of the Town of Prospect,
Maine in Town Meeting.
§2 Permit Required
A. The provisions of this Ordinance shall apply to all mineral extraction activities within the
boundaries of the Town of Prospect, Maine, except as provided in Article II of this
Ordinance. This applies to all extraction activities described in Article I which are:
1. A resumption of extraction activities in inactive operations, or on parcels of land
on which tnactive operations are located, or on parcels of land that are under a
common scheme of development with parcels of land on which inactive
operations are located;
2, Active Operations not permitted by the State;
3. New or proposed; or,
4. Expansions of the above, except as provided in Article II of this Ordinance.
B. Approval under this Ordinance shall be obtained as part of and concurrent with any other
Planning Board and/or Site Plan review and approval applicable to the mineral extraction
activity.
Cc. Any application submitted to the Planning Board for any portion of the affected area,
shall be treated as if it includes all the previously exempt or non-permitted un-reclaimed
inactive area.
§3 Permit To Be Recorded
No permit shall take effect or be valid unless it is recorded in the Waldo County Registry of Deeds
together with the site plan, the reclamation plan and all other plans such as but not limited to the spill
containment plan or blasting plan, and the survey, if required, within 90 days of the granting of said
permit at the expense of and by the applicant.
§4 Types of Mineral Extraction Activities Prohibited
Any proposed mineral extraction activity not specifically described in this Ordinance shall be prohibited.
§5 Accessory Uses Not Included
It is the intent of this Ordinance that a permit granted hereunder does not imply permission to undertake
any accessory or non-extraction uses. Such uses shall be subject to Site Plan Review (if applicable) and
all other applicable ordinances of the Town of Prospect.
2
ARTICLE IV -- MINERAL EXTRACTION APPLICATION REVIEW
§1 Application
Prior to the establishment or expansion of a mineral extraction activity, an applicant shall apply for and
receive a mineral extraction permit pursuant to this Ordinance, as well as all other applicable town
pennits or approvals. In addition to any submissions required by other applicable town ordinances, the
mineral extraction application shall contain the following information, where applicable, and any other
information that may be required by Article V1 of this Ordinance:
A. Site Plan, prepared by and bearing the seal of a land surveyor or engineer licensed to
practice in the State of Maine, showing all information required by the Town of Prospect Site
Plan Review Ordinance as well as the following:
1. Boundaries of the subject parcel, and of all lots with any boundary that is located
within 1,000 feet from any boundary of the subject parcel. The Planning Board
shall require a survey of the extraction area by a licensed surveyor unless the area
is less than 5 acres. The Planning Board may require a survey of the property by
a licensed surveyor if the boundaries are in question.
2. Location of existing, inactive areas, reclaimed areas, and proposed mineral
extraction activities and structures on the property.
3. Location and identification of existing public and private streets, roadways and
rights-of-way on or abutting the property.
4, Location of proposed access road to the mineral extraction activity from public
roadways.
5. Location of all conservation areas and protected natural resources.
6. Location and type of existing and proposed berms, fences, hedges, and tree lines.
7. Location of existing natural drainage ways and proposed storm drainage
facilities, including dimensions of culverts, pipes, etc. If any portion of the
mineral extraction activity is in a flood-prone area, the boundaries of any flood
hazard areas and the 100-year flood elevation shall be delineated on the plan.
8. Location of existing wells:
a. all wells on the parcel itself; and,
b, within 1,000 feet of the proposed activity, if 5 acres or more; or,
c. within 500 feet of the proposed activity if less than 5 acres.
9, Location of proposed hazardous material storage areas including but not limited
to fuel storage and handling, and washdown areas.
B. The name, address and telephone number and email of each applicant, and if the
applicant is not a natural person, list of the names, titles, addresses and telephone
numbers and email addresses and fax numbers of the natural persons that will be
responsible for the management of the operation.
Cc. A traffic impact narrative shall be provided if required pursuant to Article VI of this
ordinance.
D. A narrative description of the surface and ground water impacts, including protection
plans and the identification of any significant mapped aquifers.
E, Information and a map showing soils conditions on the site of the proposed mineral
extraction activity. For subsurface sewage disposal proposed, the information shall
include evidence of soil suitability according to the standards established in Article VI of
this Ordinance. The Site Plan shall show the location of soil test areas.
F. A reclamation plan showing the final grades and re-vegetation plan, and any phasing of
the plan, and which addresses the provisions of Article V, §2 and compliance with Maine
Erosion and Sediment Control BMPS, Section I, 1.
3
G. A narrative description of the impact on the wildlife habitat, and the location of any deer
yard or other significant wildlife habitat designated by Maine Dept. of Inland Fisheries
and Wildlife, including any proposed mitigation plan.
H. A narrative description of the present use of the parcel and property within 500 feet of the
activity.
I. Estimated duration of the operation, including phasing.
J. Types and amounts of equipment to be used in the operation.
K. A Spill Prevention, Control & Containment (SPCC) Plan. (See Article V §2-C).
L. Blasting Plan, if blasting is planned. Upon preliminary review of the application, the
Planning Board shall require that the Blasting Plan include an environmental impact
study, a hydrogeologic study, and a pre-blast survey of the surrounding areas to such a
distance as the Planning Board shall determine, but in no case less than 3,500 feet from
the boundary line of the proposed blasting site.
M. Plan for screening the excavation activity from abutters and any public roads.
N. All submissions made to any federal or state agency concerning the property.
O. Proof of technical ability to complete the project as reasonably related to size and
intensity of project.
P, Type of mining planned.
Q. Other information the Planning Board may require to meet standards in Article VI.
R. Erosion control plan for all portions of the proposed operation which are not internally
drained.
§2 = Alternate Submissions
Activities that already have a valid DEP permit or a complete pending DEP application may submit the
DEP application to the Planning Board subject to the authority of the Planning Board to request additional
information or submissions above which are not covered by the DEP application.
§3 Exemptions from Submissions
An applicant may request waiver of any submission requirement, which waiver the Planning Board may
grant upon a demonstration that it is unnecessary or unduly burdensome given the scope, scale, size,
location or minimal likely impacts of the proposed operation.
§4 Application Procedures
A. Applications for mineral! extraction permits shall be submitted to the Town Clerk or Chair
of the Planning Board together with and as part of any other materials required to be
submitted for Site Plan approval of the development. All application procedures set forth
in the Town of Prospect Site Plan Review Ordinance shall apply to review of applications
pursuant to this Ordinance.
1. Applications for mineral extraction activity permits shall be submitted to the
Town Clerk or Chair of the Planning Board who shall issue to the applicant a
dated receipt.
i The application shall be accompanied by a fee in accordance with a fee schedule
determined by the Board of Selectmen, with separate fees to be set for mineral
extraction activity of | to 5 acres, and for mineral extraction activity over 5 acres.
The CEO shall advise the Planning Board regarding the classification of the
proposed pit and application fee to be paid. Additional fees may be required by
the Prospect Planning Board to cover the cost of reviewing the application as
specified in Article [V §1-C(4) and Article IV §5-H.
4
B. Public Hearing and Planning Board Decision
1. All mineral extraction activity larger than 1 acre shall require a public hearing.
Notice of and procedures for the public hearing shall be as set forth in the Town
of Prospect Site Plan Review Ordinance.
2. Upon approval of the mineral extraction activity, the Planning Board Chair or
designee shall sign all copies of the final site plan. The original shall be recorded
by the applicant with the Waldo County Registry of Deeds. One copy shall be
retained by the applicant, one copy shall be retained by the Planning Board, one
copy shall be filed with the Tax Assessor, and one copy shall be filed with the
Code Enforcement Officer. Recording fees shall be paid by the applicant. The
Planning Board shall maintain a permanent record of its action on the mineral
extraction activity. Any plan not recorded within 90 days after approval with the
Waldo County Registry of Deeds shall he null and void.
3. Approval by the Planning Board of a mineral extraction activity plan shall not be
deemed to constitute or be evidence of any legal acceptance by the Town of
Prospect, Maine of any road, easement, or other open space shown on such plan.
Cc. Operation Conditions and Limitations
Before any mineral extraction activity begins, and as a condition of the permit, the applicant shall
apply for and receive all applicable permits as may be required by Town, state or federal
regulations, laws or ordinances regulating such developments, including but not limited to the
Town of Prospect Site Plan Review Ordinance. Any violation of other permits necessary for
operation and noted in the permit shall be considered a violation of this Ordinance.
D. Expiration of Approval
Mineral Extraction Activity permits shall automatically expire one year from the date of issuance
unless the mineral extraction activity has been substantially commenced during that period.
E. Plan Revisions after Approval
Plan revisions after approval shall be made as further provided for in Article VI §4 of this
Ordinance.
F. Expert Witnesses and Opinions
In the event that the Planning Board requires expert opinions, advice or testimony during the
course of reviewing the application, it shall require the applicant to pay for such services, after
giving notice to the applicant of the name of the expert, the area of qualification of the expert, and
the purpose for which the expert is required, and the approximate cost of the expert. The applicant
shall be provided with an opportunity to meet with the Planning Board to arrange a schedule for
payment of the costs. The applicant shall deposit with the Town funds sufficient to cover the
anticipated review costs and may be submitted in increments as approved by the Planning Board.
Such funds shall be allocated to a sub-account to be maintained by the Town Treasurer and may
not be spent for any other municipal purposes. If any funds remain in said sub-account after the
completion of expert review, they shall be returned to the applicant within 45 days.
The applicant shall have the right to request a public hearing before the Board of Appeals to
determine if the experts, as noticed by the Planning Board, are reasonably necessary to a
determination of any issue properly before the Planning Board. It will be the applicant's burden to
prove that the requested expert is unnecessary, or that the cost is excessive, The applicant shall
request the hearing within 10 days of Planning Board's determination of the requirement for
expert assistance.
G. Transfer of Mineral Extraction Activity Permit.
Within thirty (30) days of the date of the transfer, by sale or otherwise, of land upon which a
| mineral extraction operation is situated, the new owner(s) or operator(s) shall file with the Town
notice of the transfer and a statement of agreement and capacity to comply with the Town
Mineral Extraction Permit.
5
l. Failure to comply with this requirement shall be a violation of this Ordinance and
may subject the violator to any penalty, or combination of penalties, that may be
imposed under the Ordinance.
2. The transferee shall provide the Planning Board the information as required in
Article [V §1-A, B, and D of this Ordinance.
3. Proposed changes to the terms of the permit, including financial responsibility
requirements, shall be considered a request for permit modification and
processed accordingly.
4. The Planning Board shall hold a public hearing and provide an opportunity for
public comment on any substantive changes in the terms of the permit. Notice of
that hearing shall be as specified in Article IV §4-C.
§5 Appeals
Any person aggrieved by the Planning Board's issuance or denial of a permit or approval required under
this Ordinance shall have the right to file a written appeal by following the provisions set forth in the
Town of Prospect Site Plan Review Ordinance.
ARTICLE V --- MINIMUM DESIGN & PERFORMANCE STANDARDS
§1 General Requirements -- All Operations
A. Mineral extraction activities shall conform to all applicable State laws and local
ordinances or regulations.
B. The owner and/or permit holder of a mineral extraction activity shall be responsible, both
jointly and severally, for ensuring the maintenance of all infrastructure, structures and
their sites in accordance with the terms of this Ordinance and any permits governing the
activity.
ed The Planning Board shall consider the financial capacity, technical ability, and prior
performance of the applicant to complete all proposed activities. The performance record
shall include any prior violation, suspension, or revocation of a permit issued under this
ordinance, or similar permit issued by any other agency of government, and any other
environmental enforcement history.
D. The Planning Board may approve the application only if the applicant or agent is in
compliance with all other Town of Prospect or State of Maine permits for Mineral
Extraction Activity. The applicant or agent shall be deemed not in compliance if it is the
owner or operator of a mineral extraction operation which has been issued a notice of
violation of an applicable law, ordinance, regulation or permit, and has not brought the
property or operation in full compliance with any order of the court.
E. In all cases, the applicant shall have the burden of proof that all requirements, standards,
and conditions of this Ordinance and subsequent approval are met.
F. A copy of the permit must always be displayed on site.
§2 Performance Standards
A. Erosion, Sedimentation Control & Storm Water Management.
1. All projects.
a. Sediment may not leave the parcel or enter a Protected Natural Resource.
b. Topsoil stockpile must be stabilized and inspected as specified in Article
V§2-B(1), below.
6
2. Internally Drained projects.
a. Land shall! be restored and stabilized according to the Reclamation Plan.
b. For projects over 5 acres, a volume calculation shall be provided
demonstrating that the area(s) will safely hold a volume of precipitation
at least equal to that which may be expected in the area from the 25-year,
24-hour storm event for the region, per the U.S.D.A. Natural Resources
Conservation Service.
3, Externally Drained Projects.
a. If surface water flows out of and away from the proposed site during and
after excavation activities, the following should be provided to assure
proper erosion control and prevent siltation of downstream waters.
Temporary erosion control measures shall be included in the project
design, such as hay bale barriers, silt fencing, and riprap. Plans shall
show the location and installation details and include a description of the
timing of installation, inspection and maintenance of erosion control
measures.
b. For projects over 5 acres, the applicant shall submit, and the Planning
Board shall review additional information including:
i. A plan and narrative detailing specific erosion contro! measures;
and,
ii. A site plan showing the pre-construction and post-construction
contours, and if applicable, phased contours. The plan must show
on and off-site watershed boundaries and hydrologic surface
water flow lines.
C: Sedimentation pond location and design, if any, shall be designed to the
25-year storm event and based on the U.S.D.A. Natural Resources
Conservation Service methodology. The location and construction details
of the pond shall be shown on the site plans.
B. Reclamation Plan
The affected land must be restored to a physical state that is similar to that which existed prior to
any development or encourages the productive use of the land. The Planning Board shall use
discretion on reclamation of old pits if they have been reclaimed by natural processes and
applying reclamation standards would destabilize an area.
A reclamation plan is required to be submitted with all permit applications according to the
following specifications:
1. Topsoil Stockpiling
Topsoil which is stripped or removed must be stockpiled in sufficient quantity for
use in reclaiming disturbed land, unless it is demonstrated to the Planning Board
that it is not needed for reclamation purposes. Topsoil stockpiles must be seeded,
mulched, or otherwise stabilized. At least 4 inches of topsoil shall be used for
final cover.
pee Regrading
Upon completion of the excavation, the side slopes must be regraded to a slope
no steeper than 2.5 horizontal to 1 vertical.
3. Vegelative cover
Vegetative cover shall be established on all affected land. Topsoil must be
placed, seeded, and mulched within 30 days of final grading if it is within a
current growing season or within 30 days of the start of the next growing season.
a. Vegetative material used in reclamation must consist of grasses,
legumes, herbaceous or woody plants, or a mixture thereof. Plant
material must be planted during the first growing season following the
7
reclamation phase. Selection and use of vegetative cover must take into
account soil and site characteristics such as drainage, pH, nutrient
availability, and climate to ensure permanent growth,
b. The vegetative cover is acceptable if within one growing season of
seeding:
i. the planting of trees and shrubs results in a permanent stand, or
regeneration and succession rate, sufficient to assure a 75%
survival rate; and,
ii. the planting results in 90% ground coverage.
4. Structures and roads
All structures and access, haul, or other support roads must be reclaimed once no
longer used, unless reserved for future productive use of the land, as described in
the reclamation plan.
5. Phased Reclamation
For projects over 5 acres, the site must be reclaimed in phases so that:
a. the working pit does not exceed 10 acres at one time and the area being
actively mined does not exceed 5 acres at any time.
b. For guidance in planning and implementation of reclamation, see the
most recent edition of Maine Erosion and Sediment Control] Handbook
for Construction: Best Management Practices (Cumberland Cry.
SWCD: 3/1991) for Pit Reclamation.
6. Timeline
A timeline for reclamation shall be included with the reclamation plan. All
reclamation shall begin within 6 months of completion of phasing, or the
completion or abandonment of the project. The site shall be inspected when the
regrading and planting is completed and again at one year to ensure compliance
with the reclamation plan.
7. Upon completion of reclamation or a reclamation phase for operations over 5
acres, a written certification signed by a professional engineer registered in the
State of Maine shall be submitted to the Code Enforcement Officer at the
expense of the applicant, certifying that the reclamation is in compliance with the
approved plans.
A Certification of Completion of Reclamation shall be issued by the Code
Enforcement Officer only after the final inspection is made and is passed.
C: Petroleum Usage
l. Spill prevention, control, and countermeasures plan shall be required for all
projects.
2. Any discharge or leak of petroleum or other hazardous liquids over 5 gallons
shall be reported to the Code Enforcement Officer, who shall prepare a report to
be kept with the permit in the Town's records. All discharges or leaks of any size
shall be cleaned up promptly according to the spill containment and cleanup
provisions of CMR 378, Section 511.
3. A copy of the Spill Prevention Control, and Countermeasures Plan shall be kept
available on site at all times.
D. Buffers and Setbacks
Buffers and setbacks shall be provided and shown on the site plans as follows:
L. Property Boundaries.
To minimize visual impacts and provide for wildlife, a 100-foot buffer shall be
maintained from property boundaries. This buffer may be reduced to 25 feet with
written permission of an abutting landowner; or may be eliminated between
abutting properties provided:
8
a. written permission is obtained;
b. Erosion & stormwater control standards on both properties are met;
c. Elimination of the buffer does not increase the runoff from either
excavation across the property boundary; and
d. Any written permission to reduce a buffer must provide that it remains in
effect until mining ceases and must be recorded in the Registry of Deeds.
All property boundaries must be identified in the field by markings such
as metal posts, stakes, flagging or blazed trees.
2. Existing Structures.
A 300-foot buffer from the closest edge of an existing residence or business, cemetery, or
farm building used for livestock shall be maintained with all projects. This buffer may be
reduced with written permission of the owner of the structure, provided that said
agreement must be recorded in the Registry of Deeds.
3. Protected Natural Resources
The following shall apply:
a. A 100-foot horizontal distance undisturbed natural buffer shall be
maintained from the Normal High Water Mark of all ponds, lakes,
streams, brooks, rivers and marshes or any other permanent surface water
body or wetland. A minimum 75-foot undisturbed natural buffer shall be
maintained between the working edge of the excavation and any coastal
wetland or significant wildlife habitat contained within a freshwater
wetland or a freshwater wetland consisting of or containing:
i. Under normal circumstances, at least 20,000 square feet of
aqualic vegetation, emergent marsh vegetation or open water,
except for artificial ponds or impoundments; or
il. Peat lands dominated by shrubs, sedges and sphagnum moss.
b. Where the slope is greater than 15%, a natural buffer of 75 feet plus 4
times the average slope percent in horizontal width shal] be maintained
between the affected land and the protected resource, e.g. if the slope is
15%, then the calculation would be 75 + (4 x 15) = 135 feet for the
buffer.
4. Public Roads.
A 150-foot natural buffer from the closest edge of the shoulder of a public road
shall be maintained with all projects. A 50-foot-wide undisturbed natural
vegetated area, closest to any private road or right of way, shall be maintained,
except for any access road entrance. Reduction of the 50-foot buffer from a
private road or right of way is allowed with written permission of adjacent
property owners.
5. Screening.
The Planning Board may at its discretion request the applicant to take specific
actions to insure the effectiveness of any required buffer required, including, but
not limited to, the planting of trees, placement of solid fence or creation of berm.
E. Road Design, Circulation and Traffic
Li: The intersection of any road within the development area and an existing public
road shall meet the following standards:
a. The angle of intersection shall be 60 degrees to 90 degrees.
b. The maximum permissible grade within 75 feet of the intersection shall
be 3%.
9
c. A minimum sight distance of 10 feet for every mile per hour of posted
speed limit on the existing road shall be provided. Sight distances shall
be measured from the driver's seat of a vehicle that is 10 feet behind the
curb or edge of shoulder line with the height of the eye 3 1/2 feet above
the pavement and the height of object 4 1/4 feet.
d. The center line of any road within the project intersecting an existing
public road shall be no less than 125 feet from the center line of any
other road intersecting that public road.
e. Turning lanes, traffic directional islands, frontage roads, and traffic
controls shall be provided on public roads at the developer's expense,
where necessary, in the opinion of the Planning Board, to safeguard
against hazards to traffic or pedestrians, and/or to avoid traffic
congestion.
f All access/egress roads leading to or from the extraction site to public
ways shall be treated with suitable materials to reduce dust and mud; and
paved or otherwise hard surfaced for a distance of at least 200 feet from
the public road.
rd Traffic impacts to be considered:
a. Where mineral extraction activity traffic will use town-maintained roads,
the proposed traffic volume and type must be suitable and appropriate to
the type and condition of the existing road as determined by Section
E(2)(b)(v), below. In determining this standard, the road condition
survey must show not only the current capacity of the existing road but
also the type, size and volume of existing traffic and compare this to the
proposed traffic volume and type.
b, The Planning Board has the authority to require the applicant to furnish a
performance bond payable to the Town of Prospect issued by a surety
company licensed to do business in the State of Maine, guaranteeing the
current condition of Town owned or Town maintained roads.
c. The road giving access to the Mineral Extraction Activity and
neighboring roads which can be expected to carry traffic to and from the
Mineral Extraction Activity:
i. shall have appropriate traffic carrying capacity;
ii. the surface shall, if a town or town-maintained road, be suitably
improved if necessary, at the applicant's expense, and with the
permission of the Selectmen and the Road Commissioner, to
accommodate the amount and types of traffic generated by the
proposed mineral extraction activity:
iil. shall not increase the volume to capacity of any town or town-
maintained road above 80%; nor reduce the town road's Level of
Service to MDOT rating "D" or below;
iv. shall have minimum travel surface width of 16 feet with 2-foot
shoulders; and
Vv. shall require a road condition survey of the town or town-
maintained road or, on operations larger than 5 acres, the
Planning Board shall require an engineering impact study, at the
expense of the applicant; and
vi. may require mitigation for adverse impacts on town or town-
maintained roads, by decision of the Planning Board.
c. Projects that do not meet these standards shall not be approved.
3. Routing.
10
Where necessary to safeguard against hazards to pedestrians and to avoid traffic
congestion or adverse impacts to Town roads, alternative routing may be
required.
F, Groundwater Impacts
Water is a precidus resource and the applicant must take measures to assure that the quality of the
groundwater is protected. Prior to the initial blast or excavation activity, the applicant must
conduct water quality tests on all non-applicant-owned wells within 3,500 feet of the approved
boundary line of the blasting site, or as determined by the Planning Board for production blasting
and Planning Board-approved projects. Water quality testing must also be done post-blast if
requested by the property owner because of evidence of substantive change in water quality.
Turbidity in wells tested shall be no greater than that which existed prior to the blasting as
established in the pre-blast survey.
The following requirements apply to all projects unless otherwise noted.
1. Ground Water Quality.
The Mineral Extraction Activity shall not cause an adverse impact to ground
water quality and quantity as they existed prior to the application.
2. Ground Water Buffer.
To provide an adequate buffer for ground water and allow for filtration of
impurities from surface water, extraction shall not be any closer than 5 feet above
the maximum seasonal high-water level. The applicant shall provide
documentation of the groundwater table. The Planning Board may require
monitoring of groundwater levels and quality to ensure there are no adverse
impacts to any water supplies or wells within 500 feet of the site for non-blasting
operations.
The Planning Board may require addilional monitoring for 3,500 feet of the
mineral extraction site boundary lines or within the boundaries of the Town for
blasting operations.
3. Water Supply Buffer.
A 300-foot separation must be maintained between the limit of excavation and
any pre-existing private drinking water supply. A 1,000-foot separation must be
maintained between the limit of excavation and any well or spring which
qualifies as a public drinking water supply. The Planning Board shall require
larger buffers from water supplies, if it finds that a hazard is shown to exist due
to the Mineral Extraction Activity.
4. Water Use.
a. A mineral extraction activity must not withdraw more than 5,000 gallons
of ground water per day, unless a hydrogeologic study is submitted by a
hydrogeologist that determines this will not represent an environmental
hazard or threaten drinking water supplies.
b. Any water that is discharged from the site shall be routinely monitored
for sediment, pH and other contaminants to ensure the discharge shall not
adversely affect surface water quality. Records of such monitoring shall
be provided upon request from the Code Enforcement Officer.
5. Standards for Acceptable Groundwater Impacts
a. Projections of ground water quality shall be based on the assumption of
drought conditions (assuming 60% of annual average precipitation).
b. No mineral extraction activity shall increase any contaminant
concentration in the ground water to more than one half of the Primary
Drinking Water Standards. No mineral extraction activity shall increase
11
any contaminant concentration in the ground water to more than the
Secondary Drinking Water Standards.
c. If pre-existing ground water contains contaminants in excess of the
primary standards, and the mineral extraction activity is to be served by
on-site groundwater supplies, the applicant shali demonstrate how water
quality will be improved or treated, if necessary.
G. Noise
Normal operation times shall be specified in the application and permit and shall be limited so as
not to constitute a nuisance to residents in the neighborhood, including but not limited to daily
starting and ending times.
1. Noise shall be required to be mitigated so as not to be objectionable due to
intermittence, beat frequency, shrillness, or volume outside of the boundaries of
the project.
2. The maximum permissible sound pressure level of any continuous, regular or
frequent source of sound shall be established by the time period and type of land
use district as listed in Subsection 3, below, Both dB(A) and dB(C) scales shall
be used, and a violation of either standard shall be deemed to constitute a
violation of this Ordinance.
Noise shall be measured as to the Site Plan Review Ordinance, but the following
standards shall apply:
3. Sound from production blasting shall be limited as follows, provided a blasting
plan has been approved by the Planning Board as a part of the permit:
All Districts dB(A) 110 dB(C) 126
4. The noises of safety signals, warning devices, and emergency pressure relief
valves and other emergency activity shall be exempt from the noise level
regulations:
H. Mitigation of Effects on Neighboring Community
1. The project shall not operate on Sundays or the following holidays: New Year's,
Memorial Day, Fourth of July, Labor Day, Thanksgiving and Christmas.
2. Hours of Operation for specified stone quarrying activities (excluding sand,
gravel, topsoi! and loam) shall be as follows, unless more restrictive hours of
operation are required as a condition to permit approval:
Blasting 9am -- 3pm Monday - Friday
Crushing & Processing 7am -- 7 pm Monday - Friday
Drilling 7am--7 pm Monday - Friday
Loading 7am --7 pm Monday -- Friday
9am - 3pm Saturday
An applicant may request extended hours of operation if sufficient noise abatement can
be demonstrated at the discretion of the Planning Board. The Planning Board
will require a noise study performed by a qualified licensed acoustical consultant.
I. Additional Review Criteria
In addition to the standards contained in this section, the Planning Board shall review the project
for compliance with all applicable review criteria contained in Title 38 M.R.S.A. Chapter 3,
Subchapter 1, Article 7 Performance Standards for Excavations for Borrow, Clay, Topsoil, or Silt
and Article 8-A Performance Standards for Quarries. Whenever the provisions of Title 38 come
into conflict with other review criteria of this ordinance, the more restrictive shall apply.
12
ARTICLE VI -- ENFORCEMENT AND INSPECTIONS.
§1 Annual Compliance Inspection
A. The annual compliance inspection fee, payable to the Town of Prospect, shall be in
accordance with a fee schedule determined by the Board of Selectmen.
B. The Annual Compliance Inspection (ACT) shall be conducted by the CEO during the
months of June through October. The CEO shall provide the selectmen, site owner, and
site operator with a report outlining any violations of this ordinance and remediation
required.
Cc, It is the responsibility of the permit holder to ensure that the inspection is conducted as
required by this section and to ensure payment of the annual mineral extraction
inspection fee as established by the Board of Selectmen. Failure to pay the annual
inspection fee may result in a "Stop Work Order" being issued.
D. In addition, the CEO shall inspect the gravel extraction or rock mining operation for
compliance with all applicable standards contained in 38 M.R.S.A. Chapter 3, Subchapter
1, Article 7 Performance Standards for Excavations for Borrow, Clay, Topsoil, or Silt and
Article 8-A Performance Standards for Quarries. Whenever the provisions of Title 38
M.R.S.A. come into conflict with other inspection requirements of this ordinance, the
more restrictive shall apply.
E. The CEO shall have the right of entry onto any mineral extraction activity site at
reasonable times and with reasonable notice for the purposes of making any inspection
required by this Ordinance or of investigating any potential violations.
2 5-Year Renewal
Every five (5) years an approved permit requires a review by the Planning Board. If a Five-Year
Review application is filed at least thirty (30) days before the annual renewal deadline, mining
activities may continue under the existing permit until the Planning Board review has been
completed.
Upon receiving the review and approval request, the Planning Board shall schedule a public
hearing regarding the request. The applicant shall provide at a minimum, an updated site plan
prepared and stamped by a surveyor or engineer licensed in the State of Maine identifying the
original footprint of the operation, the original active extraction area, the current extraction area,
any reclaimed areas, and any changes to the site since the original approval. Additional data
may be requested by the Planning Board as necessary to determine compliance with the
standards of this ordinance.
The Planning Board may, as part of the renewal process, impose new conditions on the license
or modify the license in any way necessary to assure compliance with the license being reviewed
and the Ordinance as it is in effect at the time of renewal. If there has been a history of
significant non-compliance, the Planning Board may deny the request for license renewal. A
mining activity cannot be expanded beyond its original license area as part of the 5-year process.
Any expansion not allowed in the original application must be processed as a separate
application under the ordinance in effect at the time of the expansion application.
13
§3 Violations
A. A. No mineral extraction activity plan shall be recorded in the Waldo County Registry of
Deeds until a Final Plan has been approved and signed by the Planning Board in
accordance with this Ordinance.
B. No mineral extraction activity shall be conducted except in compliance with all
applicable state laws and regulations, town ordinances, plans approved by the State or
Town, or any terms and conditions of any state or Town permit or approval.
C. No person, corporation or other legal entity may conduct excavation activities or sell or
offer to sell any materials in a mineral extraction activity site which has not been
approved by the Planning Board and recorded in the Waldo County Registry of Deeds.
D. Any operation that is in violation of other approvals {such as DEP Intent to Comply for
Pits or for Quarries or DEP permits) covering the same operation shall be deemed in
violation of approvals granted under this Ordinance, in that all other approvals are
necessary for approvals under this ordinance to be valid.
§3 Mineral Extraction Plan Amendments after Approval
All activities shali be conducted as depicted on the approved plans. No changes, erasures, or
modifications shall be made in a Final Plan after approval has been given by the Planning Board unless
the plan is first resubmitted, and the Planning Board approves any modifications. The applicant is not
required to go through the complete review process of an amendment to an existing mineral extraction
activity, unless, in the judgment of the Planning Board the amendment substantially alters the character of
the original mineral extraction activity, or unless the change constitutes a new mineral extraction activity.
If an amended Final Plan is recorded without complying with this requirement, it shall be null and void.
The Planning Board shall record a revocation of a previously recorded document in the Waldo County
Registry of Deeds.
§4 Enforcement
A. The Code Enforcement Officer of the Town of Prospect, Maine, shall enforce this
Ordinance and the Selectmen of the Town of Prospect, Maine are authorized to institute
legal proceedings to enjoin violations of this Ordinance.
B. If the Code Enforcement Officer finds a violation of any provision of this Ordinance or
failure to comply with any order, permit, approval, condition or other final decision or
action of the Planning Board that constitutes a substantial and immediate danger to the
health, safety or welfare of any person(s), or property or environment of the Town of
Prospect, Maine, the Code Enforcement Officer may issue a Stop Work Order and the
Town may initiate immediate proceedings to abate or correct such violations. Violations
are subject to inspection as per §1 of this Article.
C. In any action to enforce any provision of this ordinance where the Town of Prospect
prevails, said Town shall be awarded penalties, reasonable attorney fees, expert witness
fees, costs and other remedies available pursuant to Title 30-A M.R.S.A. § 4452.
§5 Penalties
A. Any person, firm or corporation, being the owner or having control or use of any mineral
extraction activity in violation of any of the provisions of this Ordinance or terms or
conditions of any order, permit or approval or final decision of the Planning Board shall
be subject to a civil penalty due and payable to the Town of Prospect, Maine of not less
than one hundred dollars ($100.00) for each day said violation exists and not more than
twenty-five hundred dollars ($2,500.00) for each day said violation exists or twice the
14
economic benefit resulting from the violation, whichever is greater, not to exceed
$25,000 per day. If the same person has been convicted of a violation of this ordinance
within the previous two years, the maximum penalty is twenty-five thousand dollars
($25,000.00) for each day said violation exists.
B. In setting the penalties, the Court shall consider but is not limited to the following:
1, Prior violations by the same person;
ey The degree of environmental damage that cannot be abated or corrected;
3, The extent to which the violation continued following an order to stop;
4, The extent to which the Town of Prospect, Maine contributed to the violation by
providing incorrect information or failing to take timely action; and
5. Whether penalties have been imposed by another governmental agency for the
same incident(s).
c. If the maximum penalty amount of Article VII §6-A of this ordinance is held void or
invalid it is the intent of the Town of Prospect, Maine that provisions of Title 30-A,
M.R.S.A. Section 4452 be given full force and effect and that the maximum penalty
amounts authorized by such provision apply to violations of any order, permit, approval
or final decision of the Planning Board, or any provision of this ordinance.
ARTICLE Vil -- SEVERABILITY & CONFLICT
Should any section of this Ordinance be declared by the courts of the State of Maine or by the courts of
the United States to be invalid, such decisions shall not invalidate any other section or provision of this
Ordinance.
This Ordinance shall in no way impair or remove the necessity of compliance with any other rule,
regulation, bylaw, permit or provision of law. Where this Ordinance imposes a greater restriction upon the
use Of the land, buildings or structures, than any other rule, regulation, bylaw, permit or provision of law,
the provisions of this Ordinance shall prevail.
ARTICLE VIll- AMENDMENTS TO THE ORDINANCE
An amendment to this ordinance may be initiated by:
A. The Planning Board (provided that a majority of the Board has so voted), or,
B. Request of the Select Board to the Planning Board, or,
Cc. Written petition to the Select Board bearing signatures of registered voters of the Town of
Prospect, Maine numbering at least 10% of the number who voted in the last
gubernatorial election.
All proposed amendments to this ordinance shall be referred to the Planning Board for their
recommendation. The Planning Board may hold a public hearing on any proposed amendment. Within 30
days of receiving a proposed amendment or within 30 days of the public hearing, if one is held, the
Planning Board shall make known their recommendation to the Select Board and the Town. After
15
receiving the recommendation of the Planning Board, the amendment shall be voted on by the voters of
the Town of Prospect, Maine at a Town Meeting, a simple majority vote being required for adoption.
ARTICLE IX --REFERENCES & DEFINITIONS
§1 Construction of Language
In general, all words and terms used in this Ordinance, if not defined herein, shall have their customary
dictionary meanings, unless such word or term is otherwise defined in Title 38 M.R.S.A. Section 490-A
or its successor. More specifically, certain words and terms shall be described below.
§2 Relationship to Other Town Ordinances
This Ordinance shall be applied as part of the site plan review and approval process as set forth in the
Town of Prospect Site Plan Review Ordinance. All substantive and procedural provisions of the Site Plan
Review Ordinance shall apply to review of mineral extraction activities covered by this Ordinance.
Where there is a conflict between the language contained in this Ordinance and the Site Plan Review
Ordinance any other Town ordinances, the stricter or more specific language shall apply.
§3 References to the Town
All references in this ordinance to "Town," "the Town," "the Town of Prospect," and to any board,
official or officer, unless clearly defined otherwise, shall be construed to be references to The Town of
Prospect, Maine, an incorporated municipality in the County of Waldo, State of Maine and its municipal
boards, officials and officers.
§4 References to Other Documents
All references in this Ordinance to any statute, regulation, document, chapter, handbook, or other external
reference, shall be construed to be references to said documents and their successor documents, as they
may be amended or replaced from time to time by other materials.
§5 Definitions
Abandonment: Failure to complete the Annual Compliance Inspection; or to cease operations without
completing the reclamation plan.
Affected land: The land area from which the overburden will be or is being removed or has been
removed and not reclaimed; land where flat rocks are picked up from the surface or are mined; land upon
which stumps, spoil, or other solid waste will be or has been deposited; and any storage area that will be
or has been used in connection with the development, except a natural buffer strip.
Annual Compliance Inspection: An examination by the Code Enforcement Officer done on an annual
basis that shall check for compliance of the operations with the conditions and requirements of the permit.
Aquifer: An underground bed or stratum of earth, gravel or porous stone that contains water.
Average Daily Traffic (ADT): The average number of vehicles per day that enter and exit a premises or
travel over a specific section of road.
Blasting: The use of explosives to break up or otherwise aid in the extraction or removal of rock or
other consolidated natural formation.
Blasting Plan: A required written outline of all procedures and policies regarding blasting where such
activity is proposed to be used.
Borrow Pit: A development undertaken for the primary purpose of excavating sand, gravel or fill.
This does not include any excavation for rock or clay.
16
Buffer: A natural, undisturbed area or belt of land that contains vegetation. A buffer area may be larger
than specified in this ordinance.
Common Scheme of Development: Separate, but similar or coordinated, land use activities being
conducted on either a single parcel of land or on multiple contiguous parcels of land that are either under
common ownership or common management.
Disposal: The placing or storing of materials that are not going to be used in any process or
production in conjunction with the extraction activity.
Duration: A specified length of time.
Expansion of operation; Excavation operations that exceed the approved area or footprint.
Flat Rock Mining: Extraction with the primary purpose of the removal of solid rock strata using low
velocity blasting or mechanical means.
Ground water: The water beneath the surface of the ground, consisting largely of surface water that has
seeped down; the source of water in springs and wells.
Handling: Any aggregate screening, mixing or storage of sand, gravel, stone, rock, clay, or topsoil;
to include any mining of material.
Inactive: Mineral extraction that has ceased for 12 consecutive months prior to the passage of this
Ordinance, in any areas where mining extraction activity had previously occurred.
Infrastructure: Structures, roads or utility facilities that are a necessary part of the development of an
operation. Immediate Family: The husband, wife or children of a specific individual.
Lake or Pond: Any inland impoundment, natural or man-made, which collects and stores surface water.
Low Velocity: Blasting using explosive materials that are characterized by deflagration or a low rate of
reaction and the development of low pressure.
Maximum Seasonal High Groundwater Level: The upper level at which the ground water table
normally is located during the season of the year when such levels are at their highest. In order to
determine such level, a test pit reviewed by a soil analyst or groundwater data for a minimum of one year
must be gathered and analyzed. Adjustments may be made by the Planning Board for extreme seasonal
variations.
Mineral extraction activity: Any excavation or removal, handling or storage of on-site extracted sand,
gravel, borrow, rock, clay, minerals, or topsoil to include, but is not limited to, sand or gravel pits, clay
pits, borrow pits, quarries, mines, and topsoil mining or removal.
Mineral Extraction Site or Area: All of the land area disturbed or otherwise developed for the
extraction, removal, processing, or storage of sand, gravel, clay, minerals, stone, rock, or topsoil;
including any access roads and cleared areas adjacent to a pit or excavated area
Nonmal High-Water Mark of inland Waters: That line of the shores and banks of nontidal water
which is apparent because of the different character of the soil or the vegetation due, or to the prolonged
action of the water. Relative to vegetation, it is that line where the vegetation changes from predominantly
aquatic to predominantly terrestrial (by way of illustration, aquatic vegetation includes but is not limited
to the following pliant and plant groups: water lily, pond lily, pickerel weed, cattail, wild rice, sedges,
rushes, and marsh grasses, and terrestrial vegetation includes but is not limited to the following plants and
plant groups, upland grasses, aster, lady slipper, wintergreen, partridgeberry, sarsaparilla, pines, cedars,
oaks, ash, alders, elms, and maples). In places where the shore or bank is of such character the high-water
mark shall be estimated from places where it can be determined by the above method.
Objectionable Noise: Sounds occurring on a frequent or regular basis that are uncomfortable to hear
due to intermittence, beat frequency, shrillness, or volume outside of the boundaries of the project.
Personal use: Non-commercial uses for personal or immediate family needs.
Phasing of Operations: A plan of completion of the operations in separate and distinct sequences that
have a complete beginning and ending for predetermined areas. In the context of this ordinance, all phases
must be structured so that they stand on their own, shall be inspected for completeness at the end of each
phase and have reclamation of area completed at the end of each phase.
Picked Up From The Surface: A rock harvesting method that does not involve blasting and only utilizes
hand tools and small scale mechanized equipment. It is the intent of this ordinance that this method shall
17
be conducted with a minimum of soil disturbance and is utilized to remove rock that can be seen on the
surface.
Pond: See "Lake"
Preblast Survey: Documentation prior to the initiation of blasting of the condition of buildings,
structures, wells or other infrastructures and of protected natural resources, historic sites and unusual
natural areas.
Processing: Any washing, crushing, or similar processing of on-site material that does not inherently
change the nature of the product.
Production Blasting: A blasting operation carried out on a regular basis for the purpose of production
of material.
Projections of Groundwater Quality: An analysis of the potential changes to existing groundwater
quality by examining the processes, chemical byproducts and outflow of a proposed operation.
Protected Natural Resource: Weilands, significant wildlife habitat, fragile mountain areas, freshwater
wetlands, bog, marsh, rivers, streams or brooks, as the terms are defined in applicable Town of Prospect
ordinances or state law.
Quarrying Operations: The removal, processing and storage of rock, stone and flat rock, or other similar
materials.
Reclamation: The restoration to conditions similar to what existed prior to the operation or that will be
compatible with what existed prior to the operation on the area of land affected by mining under a
reclamation plan. This may include but is not limited to, grading and shaping of the land, the planting of
forests, the seeding of grasses, legumes, or crops for harvest, or the enhancement of wildlife and aquatic
resources.
Reclamation Plan: A plan which depicts how the project area will be restored, or altered for the
productive use of the land, after excavation is complete. Such a plan shall include final grading and re-
vegetation plans, of any given phase.
River or Stream: A free flowing drainage outlet, with a defined channel lacking terrestrial
vegetation, and flowing water for more than three months during the year.
Road: Public and private owned ways such as alleys, avenues, boulevards, highways, roads, streets,
lanes and other rights-of-way, as well as areas on mineral extraction activity plans designated for
vehicular traffic.
Rock: A hard, nonmetallic mineral that requires cutting, blasting or similar methods of forced
extraction.
Screening: Includes, but is not limited to, the planting of trees, placement of solid fence or creation
of berm in order to prevent a direct view of an operation or a part of an operation from public ways and
other properties.
Setback: The horizontal distance from a lot line or referred location to the nearest part of a
structure or activity.
Setback from Water: The horizontal distance from the normal high-water mark to the nearest part of a
structure or activity.
Stream: See "River."
Surface Water Body: Any water flowing on the surface, either channelized or by sheet flow including,
but not limited to, rivers, streams, brooks, ponds, lakes and any swamp, marsh, bog or other contiguous
lowland where water is periodically ponded on the surface.
Topsoil: The top layer of soil that is predominantly fertile and ordinarily moved in tillage or the
equivalent of such a layer in uncultivated soils.
Water Table: The upper surface of groundwater, or that level below which the soil is seasonally
saturated with water.
Working pit or area: The extraction area including side slopes and adjoining areas with overburden
removed, excluding roads, structures, stockpiles, etc. not part of the active mineral extraction area. For the
purposes of this ordinance, reclaimed land is not included.
END OF PROSPECT MINING ORDINANCE
18