TOWN OF PROSPECT, MAINE
SITE PLAN REVIEW ORDINANCE
Enacted: April 1, 2023
Certification of Proposed Ordinance by the Municipal Officers
This certifies to the municipal clerk of Prospect that the within ordinance is a true copy of an ordinance
entitled Site Plan Review Ordinance to be acted upon by the voters at the Town Meeting held on
April 1, 2023.
Dated: April 1, 2023 Municipal Officers of Prospect
=D) Lone f
Lo An i
< 1
Attested By: Prospect Town Clerk
Jill Riley
(Town Seal)
TABLE OF CONTENTS
TABLE OF CONTENTS wiisieitasisssieuanieanucadeueot Scams
ARTICLE I TITLE AND PURPOSE o.ccccccscsssscsssessssssssssesssssssssstssssssessssssssnsssasananeeseeee 3
ARTICLE II ADMINISTRATION AND APPLICABILITY .......:csscssvssssssssssessssssseeeeeee 3
ARTICLE III CLASSIFICATION OF PROJECTS o.sccnas ssc
ARTICLE 1V REVIEW AND APPROVAL AUTHORITY ...ccscscsssccssscssssssessssscsscescseee 5
ARTICLE V REVIEW PROCEDURES o.....ccccsssssssssssssssssssssssessesssssssssssssessessssscsseereeseee 5
ARTICLE VI PERFORMANCE GUARANTEES AND FEES........csccsssssscssssssesssscceseee 7
ARTICLE VII SUBMISSION REQUIREMENTS .c.csssscssscsccssssscsssssscsssccccosssessszseessereeee
ARTICLE VIII APPROVAL STANDARDS AND CRITERIA o.ccssssecsssssscsssssssccsseseeeseeee 13
ARTICLE IX POST-APPROVAL ACTIVITIES ssicnnscecamaey I
ARTICLE X ENFORCEMENTS AND VIOLATIONS ...:.ccsccccssssscssssssssssscsscsssssesneveee 23
ARTICLE XI APPEAL OF PLANNING BOARD ACTIONS j.scecssccssssscssssssscsscsceseeeeee 24
ARTICLE XII AMENDMENTS TO THE ORDINANCE ......csscvsvsvssssssseesseeseeseeersrevenee 25
ARTICLE XIII SETI no mseawanccorsneomawatacmnamananls
ARTICLE XIV AVAILABILITY ooccccccscccsscccsssessssssvsnsssssvesscssssssssssssssssennansnssveseseesnseeeenee 26
ARTICLE XV TRIN TS i ccc cncevsteccmatvasnentecen ner ceme coc ree ss aes Oe
2
ARTICLE I - TITLE AND PURPOSE
1 Title
This ordinance shall be known and may be cited as the Site Plan Review Ordinance of
the Town of Prospect, Maine.
2 Purpose
The purposes of this Ordinance are to promote the health, welfare and safety
of the residents of the Town of Prospect, Maine; to provide a level of
municipal review for commercial and industrial projects that could potentially
impact the community; to balance the rights of landowners to use their land
while minimizing adverse impacts on adjacent properties; to protect the
town's natural resources; to reduce the off-site effects of development,
thereby controlling the costs of maintaining or improving municipal services;
and to promote a fair, thorough, and expedient review process for proposed
activities subject to this ordinance.
ARTICLE II - ADMINISTRATION AND APPLICABILITY
| Administration
As described herein, this ordinance shall be administered and enforced by the
Town of Prospect Planning Board and a Code Enforcement Officer (CEO)
appointed by the Select Board.
2 Approval Required
A person or entity with right, title, or interest in a parcel of land must obtain site
plan approval prior to commencing any of the following activities on the parcel:
A. New development of the following: commercial uses, retail
uses, industrial uses, multi-family dwellings and subdivisions
as defined by 30-A M.R.S.A. § 4401, even if no buildings or
structures are proposed.
B. Substantial expansion of the aforementioned uses;
C. Changing the use of an existing building or structure from a residential
to a commercial or other non-residential use;
D. Changing a non-residential use to an industrial use.
E. Any Use of land involving the extraction of more than 2,000 gallons of
groundwater per day.
3 Approval Not Required
Site plan approval is not required for the
following: A. This ordinance does
not apply to:
1. Detached single and two family dwelling units (the
Town of Prospect 3 Subdivision Ordinance
may apply),
2. Town of Prospect projects,
3. Home occupations as defined herein, or
4, Changes of ownership of an existing non-commercial use, as long as no
substantial expansion or change of use is planned.
B. Nothing in this ordinance shall be construed to prevent ordinary repair,
maintenance or replacement of any part of the building or
landscaping which does not involve a substantial expansion or change of
use.
C. Minimal Impact Developments as defined in Article III(2) below.
ARTICLE ITI - CLASSIFICATION OF PROJECTS
] Project Classes
The Planning Board shall classify each project as one of three classifications: Minimal
Impact Development, Minor Development, or Major Development.
2 Minimal Impact Development
A Minimal Impact Development shall include those projects involving the
construction or addition of less than 1,000 square feet of gross non-residential floor
area, and/or projects involving the installation of less than 1,000 square feet of
impervious surfaces. Minimal Impact Developments will not require site plan
review.
3 Minor Development
A Minor Development shall include those projects involving:
A. The construction, enlargement, or expansion of at least 1,000 square feet,
but less than 3,000 square feet, of gross non-residential floor area,
B. Those projects involving the installation of at least 1,000 square feet, but
less than 3,000 square feet, of impervious surfaces for non-residential use,
C. Those projects involving the conversion of existing buildings or structures
from residential to non-residential use as outlined in the provisions of this
Ordinance, and/or
D. Those projects involving the construction of between three and five
residential dwelling units.
E. Minor Developments will require site plan approval.
4 Major Developments
A Major Development shall include those projects involving:
A. The construction, enlargement, or expansion of 3,000 or more square feet
of gross non-residential floor area,
B. Projects involving the installation of 3,000 or more square feet of
impervious surfaces for non-residential use,
4
C. Projects involving the construction of six or more residential dwelling
units, and/or
D. Projects involving the establishment of any other commercial or industrial
project not classified as a Minimal Impact or Minor Development.
E. Major Developments will require site plan approval.
ARTICLE IV - REVIEW AND APPROVAL AUTHORITY |
This Ordinance is adopted pursuant to Home Rule Powers as provided for in Article
VIII, Part 2, Section | of the Maine Constitution and Title 30-A MRSA § 3001. In
considering site plans under this provision, the Prospect Planning Board may act to
approve, disapprove or approve with conditions, any projects governed by the
Ordinance.
ARTICLE V- REVIEW PROCEDURES
| Pre-Application Procedures
The Planning Board shall use the following procedures in reviewing applications for
site plan review. Prior to submitting a formal application, the applicant or his/her
representative may request a pre-application conference with the Planning Board. A
pre-application conference is strongly advised. The pre-application conference shall be
informal and informational in nature. There shall be no fee for a pre-application
review, and such review shall not cause the plan to be a pending application or
proceeding under Title | M.R.S.A. § 302. No decision on the substance of the plan
shall be made at the pre-application conference, and any guidance given by the Code
Enforcement Officer or Planning Board during such conference shall not be binding
upon the Planning Board or applicant, except for decisions on waivers of submission
requirements.
2 Purpose of Pre-Application
The purposes of the pre-application conference are to:
A.Allow the Planning Board to understand the nature of the proposed use and
the issues involved in the proposal,
B.Allow the applicant to understand the development review process and
required submissions, and to request waiver of any submission
requirements,
C. Identify issues that need to be addressed in future submissions, and
D.Make the applicant aware of any opportunities for coordinating the
development with community policies, programs, or facilities.
3 Information Required
There are no formal submission requirements for a pre-application conference.
However, the applicant should be prepared to show a simple Sketch Plan and discuss
the following with the Board:
5
A. The proposed site, including its location, size, and general characteristics,
B. The nature of the proposed use and potential development,
C. Any issues or questions about existing municipal regulations and their
applicability to the project,
D. Any requests for waivers from the submission requirements.
4 Formal Application Procedures
The applicant must prepare and submit a site plan review application, including the
development plan and supporting documentation that meets the submission
requirements set forth below. This material must be submitted to the Chair of the
Planning Board.
A. At the first meeting in which the application is considered, the Planning
Board shall give a dated receipt to the applicant or to their appointed
representative who shall be in attendance. The Town of Prospect shall
notify, by certified return receipt mail, all
property owners within 1,000 feet of the parcel on which the proposed
development is located. The cost of said mailing will be the
responsibility of the applicant. The town will bill the applicant for said
costs. Written notice of the pending application shall be
mailed to the Selectmen, Fire Chief, Road Commissioner, Plumbing
Inspector, Code Enforcement Officer, the Town Clerk for public posting,
and other interested parties. The list of property owners located within
1,000 feet and a copy of the written notice
shall be submitted to the Planning Board and made part of the
official record.
B. Within 45 days of the receipt of a formal site plan review application, the
Planning Board shall review the material and determine whether or not
the submission is complete. If the application is determined to be
incomplete, the Board shall notify the applicant in writing of this
finding, specify the additional materials required to make the application
complete, and advise the applicant that the application will not be
considered by the Board unti! the additional information is submitted.
These steps, except the notification requirements, shall be repeated until
the application is found to be complete.
C. As soon as the Planning Board determines that the application is complete,
the Board shall notify the applicant in writing of this finding, place the
item on the agenda for public hearing and meet the notification
requirements of subsection (E) below. The public hearing may be
scheduled to occur at the same meeting at which the Board determines the
completeness of the application, so long as said agenda and notification
requirements have been met.
D. The Planning Board shall hold a public hearing on the Site Plan Review
application which shall be commenced within 45 days of receipt of the
completed application.
6
E. The Planning Board shall give written notice of the date, time, and place
of the public hearing to the applicant and all persons who received the
written notice under subsection (A). Such notice shall be paid for by the
applicant.
F. The Planning Board and/or Code Enforcement Officer may hold an on-site
inspection of the site to review the existing conditions, field verify the
information submitted and investigate the development proposal. The
Board may schedule this visit during or after the first meeting at which the
application is considered. The Board may decide not to hold an on-
site inspection when the site is snow covered. If an application is
pending during a period when there is snow cover, the deadline by which
the Planning Board shall take final action on the application as specified
in subsection (C) may be extended. This extension shall not exceed 45
days after the Board is able to conduct an on-site inspection. Written
notice of the on-site inspection shall be provided to all parties entitled to
notice under subsection (A), and shall be paid for by the applicant.
G. The Planning Board shall issue a final decision on said application
within 45 days of the close of the hearing. In such decision, the Board
shall act to deny, to approve, or to approve the application with
conditions. The Board may impose such conditions as are deemed
advisable to assure compliance with the standards of approval.
H. In issuing its decision, the Planning Board shall make written findings of
fact establishing that the proposed development does or does not meet the
standards of approval and other requirements of the Town.
I. All time limits provided for in this section may be extended by mutual
agreement of the applicant and Planning Board.
5 Final Approval and Filing
Upon completion of the requirements outlined in this Ordinance and an approval
vote by the majority of the Planning Board, the application shall be deemed to have
final approval. The site plan shall be signed by a majority of the members of the
Board and must be filed with the Code Enforcement Officer. The signed plan, with
any agreed upon conditions of approval attached, must be recorded by the applicant
in the Waldo County Registry of Deeds within 45 days of the vote to approve the
plan. The Planning Board, by vote, may extend the filing period for good cause.
ARTICLE VI - PERFORMANCE GUARANTEES AND
FEES | Performance Guarantees
A. With submittal of the application for Final Plan approval, the applicant
Shall provide a performance guarantee for an amount adequate to cover
the total engineering and construction costs of all required public
improvements, taking into account the time-span of the construction
schedule and the inflation rate for construction costs.
7
B. If the Planning Board finds that a Major Development, if left partially
completed or vacant, would cause potential economic or environmental
harm to the Town, the Planning Board may require, as a condition of
approval, that the applicant provide a performance guarantee in an amount
sufficient to cover the total cost of construction for the development, or the
cost to decommission and remove any project elements if the projected
decommissioning costs exceed the total construction cost. Upon
substantial compietion of the development, the applicant or owner/operator
may request release of such portion of the performance guarantee as is
allocated toward construction costs, and the Planning Board shall release
the guarantee requirement so long as the project is found to be in
compliance with the approved and recorded plan and all other applicable
Town ordinances. Any condition requiring the submission of a
decommissioning guarantee shall specify the length of time the guarantee
will be held by the Town, which shall not be less than one year following
the date of substantial completion.
C. Performance guarantees may be given through any of the following
options:
i. Either a certified check payable to the Town of Prospect or a
savings account or certificate of deposit naming the Town of
Prospect as owner for the establishment of an escrow account,
ii. A performance bond payable to the Town of Prospect issued by a surety
company licensed to do business in the State of Maine and approved by
the Selectmen, or
iii. An irrevocable letter of credit from a financial institution
establishing funding for the construction of the project, from which the
Town may draw if construction is inadequate, approved by the
Selectmen.
D. The Planning Board, with the advice of the Code Enforcement Officer, Road
Commissioner, Selectmen, and/or Town Attorney, shall determine the
conditions and amount of the performance guarantee. Any guarantee shall
grant to the Town the right to access the funds and the property as
necessary to complete or decommission any project elements.
2 Application Fee
An application fee must accompany an application for site plan review. This fee is
intended to cover the cost of the municipality's administrative processing of the
application, including notification, advertising, mailings, and similar costs. The fee
shall not be refundable. This application fee must be paid to the municipality and
evidence of payment of the fee must be included with the application. The
application fee shall be established by the Town of Prospect Board of Selectmen
following posting of the proposed schedule of fees and public hearing.
8
3 Technical Review Fee
In addition to the application fee, the applicant for site plan review may be required to
pay a technical review fee to defray the municipality's legal and technical costs of the
application review. The application will be considered incomplete until evidence of
payment of this fee is submitted to the Planning Board.
A. The fee will be set by the Planning Board. The Board, in
consultation with the Code Enforcement Officer, will determine
the costs of technical assistance needed after receiving
estimates for the services.
B. This fee must be paid to the municipality and shall be deposited in the
Development Review Trust Account, which shall be separate and
distinct from all other municipal accounts. If funds are expended then
additional funds will be requested of the applicant and placed into the
account.
C. The technical review fee may be used by the Planning Board to pay
reasonable costs incurred by the Board, at its discretion, which relate
directly to the review of the application pursuant to the review criteria.
Such services may include, but need not be
limited to, consulting, engineering or other professional fees, attorney
fees, recording fees, and appraisal fees.
D. The municipality shall provide the applicant, upon written request, with an
accounting of his or her account and shall refund all of the remaining
monies, including accrued
interest, in the account after the payment by the Town of all costs and
services related to the review. Such payment of remaining monies shall
be made no later than 60 days after the approval of the application,
denial of the application, formal withdrawal of the application, or
approval with condition of the application. Such refund shall be
accompanied by a final accounting of expenditures from the fund. The
monies in such fund shall not be used by the Board for any enforcement
purposes nor shall the applicant be liable for costs incurred by or costs
of services contracted for by the Board which exceed the amount
deposited to the trust account.
ARTICLE VII - SUBMISSION REQUIREMENTS
1 Waivers
Applications for site plan review must be submitted on application forms provided by
the Town of Prospect. The complete application forms, evidence of payment of the
required fees, and the required plans and related information must be submitted to the
Code Enforcement Officer and the Chair of the Planning Board. The submissions must
contain at least the following exhibits and information unless specifically waived by
vote of the Planning Board. The Planning Board may waive any of the
9
submission requirements based upon a written request of the applicant. Such request
must be made at the time of the pre-application conference or at the initial review of
the application if no pre-application conference is held. A waiver of any submission
requirement may be granted only if the Board makes a written finding that the
information is not required to determine compliance with the standards.
2 Information Required
All applications for site plan review must contain the following information:
A. A fully executed and signed copy of the application for site plan review.
B. Evidence of payment of the application and all other required fees.
C. Thirteen copies of written materials plus thirteen sets of maps or drawings
containing the information listed below. The written materials must be
contained in a bound report. The maps or drawings must be at a scale
sufficient to allow review of the items listed under the approval standards
and criteria, but in no case shall be more than 100 feet to the inch for that
portion of the tract of land being proposed for development.
3 General Information
The following general information must be included in all applications:
A. Record owner's name, address and phone number and applicant's name,
address and phone number if different.
B. The location of all required building setbacks, yards, and buffers.
C. Names and addresses of all property owners within 1,000 feet of any and all
property boundaries.
D. Sketch map showing general location of the site within the municipality.
The DeLorme map is preferred.
E. Boundaries of all contiguous property under the total or partial control of
the owner or applicant regardless of whether ail or part is being developed
at this time.
F, The tax map(s) and lot number(s) of the parcel(s) on which the project is located.
G. A copy of the deed to the property, an option to purchase the property or other
documentation to demonstrate right, title or interest in the property on the part of
the applicant.
H. The name, registration numbers, and seal of the person who prepared the
plan, if applicable.
The following general information must be included with applications for Major
Developments only:
A. Evidence of the applicant's technical and financial capability to carry out
the project as proposed.
10
4 Existing Conditions
The following existing conditions must be included in all applications:
A. The boundaries of the Shoreland District of any portion of the property
being developed are located in the Shoreland Zone as depicted on the
Town of Prospect Shoreland Zoning Map.
B. A boundary survey depicting the bearings and length of all property lines
of the property to be developed and the source of this information. The
Planning Board may waive this requirement of a boundary survey when
sufficient information is available to establish, on the ground, all property
boundaries.
C. Location and size of any existing sewer and water mains, culverts and
drains, on-site sewage disposal systems, wells, underground tanks or
installations, power and telephone lines, poles on the property to be
developed, or abutting streets, or land that
may serve the development, and an assessment of their adequacy and
condition to meet the needs of the proposed use. Appropriate elevations
must be provided as necessary to determine the direction of flow.
D. Location, names, and present widths of existing public and/or private
streets and rights-of-way within or adjacent to the proposed development.
E. The location and dimensions of existing driveways, parking and
loading areas, walkways, and sidewalks on or immediately adjacent to
the site.
F. Location of intersecting roads or driveways within 200 feet of the site.
G. The location of open drainage courses, wetlands, stonewalls, graveyards,
fences, stands of trees, and other important or unique natural areas and
site features, including but not
limited to floodplains, deer wintering areas, significant wildlife habitats,
scenic areas, habitat for rare and endangered plants and animals, unique
natural communities and natural areas, sand and gravel aquifers, and
historic and/or archaeological resources, together with a description of
such features.
H. The direction of existing surface water drainage across the site.
I. Location and dimensions of any existing easements and copies of existing
covenants or deed restrictions.
J. The location and description of the nearest water supply for fire protection.
K. A description, prepared by a licensed site evaluator, or any existing
subsurface wastewater disposal system and its viability.
1]
The following additional existing conditions must be included with Major Development
applications:
A. A general description of the soils in the area of the proposed
development or expansion. This information can be taken from the Soil
Survey of Waldo County or provided by a certified soil scientist.
B. The location, front view, dimensions, and lighting of existing signs.
C. The location, dimensions and ground floor elevation of all existing buildings on
the site.
5 Proposed Development Activity
The following proposed development activities must be included in all applications:
A. Estimated demand for water supply and sewage disposal together with
the location and dimensions of all provisions for water supply and
wastewater disposal, and evidence of their adequacy for the proposed
use, including soils test pit data if on-site sewage
disposal is proposed.
B. The direction of proposed surface water drainage across the site and from
the site, with an assessment of impacts on downstream properties.
C. Descriptions by type and amount, as well as provisions for handling all
solid wastes, including hazardous and special wastes and the location and
proposed screening of any on-site collection or storage facilities.
D. The location, dimensions, and materials to be used in the construction of
proposed driveways, parking and loading areas, and walkways and any
changes in traffic flow onto or off-site.
E. Proposed landscaping and buffering.
F. The ijocation, dimensions, and ground floor elevation of all proposed
buildings or building expansion proposed on the site.
G. Location, front view, materials, and dimensions of proposed signs together
with the method for securing the sign.
H. The size, location, direction, and intensity of illumination and method of
installation of all major outdoor lighting apparatus and signs.
1. The location of all utilities, including fire protection systems.
J. A general description of the proposed use or activity, including hours and days of
operation.
K. An estimate of the peak hour and daily traffic to be generated by the project.
L. The amount and type of any raw, finished, or waste materials to be stored
outside of roofed buildings, including their physical and chemical
properties if appropriate.
M. A list of any state and federal approvals or permits that are required, as
well as copies of any permits or approvals received. The Board may
approve development plans subject to the issuance of specified State
approvals and permits where it determines that it is not feasible for the
applicant to obtain them at the time of development review.
12
N. A schedule of construction including anticipated beginning and completion dates.
The following proposed development activities must be included with Major Development
applications:
A, Stormwater calculations, erosion and sedimentation control measures, and
water quality and/or phosphorous export management provisions, if the
project requires a stormwater permit from the Maine Department of
Environmental Protection or if the Planning Board determines that such
information is necessary based upon the scale of the project or the existing
conditions in the vicinity of the project.
6 Approval Block
Space must be provided on the plan drawing for the signatures of the Planning Board
and date together with the following words, "Approved: Town of Prospect, Maine,
Planning Board."
ARTICLE VIII - APPROVAL STANDARDS AND CRITERIA
1 Approval Standards
The following criteria shall be used by the Planning Board in reviewing applications
for site plan review and shall serve as minimum requirements for approval of the
application. The application shall be approved unless the Planning Board determines
that the applicant has failed to meet one or more of these standards. In all instances, the
burden of proof shall be on the applicant who must produce evidence sufficient to
warrant a finding that all applicable criteria have been met.
2 Utilization of the Site
The plan for the development must reflect the natural capabilities of the site to
support development. Buildings, lots, and support facilities must be clustered in
those portions of the site that have the most suitable conditions for development.
Environmentally sensitive areas, including but not limited to, wetlands, steep slopes,
floodplains, significant wildlife habitats, fisheries, scenic areas, habitat for rare and
endangered plants and animals, unique natural communities and natural areas, and
sand and gravel aquifers must be maintained and preserved to the maximum extent.
Natural drainage areas must also be preserved to the maximum extent. The
development must include appropriate measures for protecting these resources,
including but not limited to, modification of the proposed design of the site, timing
of construction, and limiting the extent of excavation.
3 Adequacy of Road System
Vehicular access to the site must be on roads that have adequate capacity to
accommodate the additional traffic generated by the development.
13
A. For developments that generate 100 or more peak-hour trips (based on the
latest edition of the Trip Generation Manual of the Institute of Traffic
Engineers), intersections on major access routes to the site within one mile
of any entrance road which are functioning at a Level of Service of D or
better prior to the development, must function at a minimum at Level of
Service D after development.
B. If any such intersection is functioning at a Level of Service E or lower
prior to the development, the project must not reduce the current level of
service.
C. A development not meeting this requirement may be approved if the
applicant demonstrates that:
I. A public agency has committed funds to construct the
improvements necessary to bring the ievel of access to this
standard, or
2. The applicant will assume financial responsibility for the
improvements necessary to bring the level of service to this
standard and will assure the completion of the improvements
with a financial guarantee acceptable to the
municipality.
4 Access into the Site
Vehicular access to and from the development must be safe, convenient and include:
A. Any driveway or proposed street must be designed so as to provide
at least the minimum sight distance according to the Maine
Department of Transportation standards.
B. Points of access and egress must be located to avoid hazardous conflicts
with existing turning movements and traffic flows.
C. The grade of any proposed drive or street must be not more than 3% for a
minimum of two car lengths, or 40 feet from the intersection.
D. The intersection of any access/egress drive or proposed street must
function at a Level of Service of D following development if the project
will generate 1,000 or more vehicle trips per 24-hour period; or (b) at a
level which will allow safe access into and out of the project if less than
1,000 trips are generated.
E. Where a lot has frontage on two or more streets, the primary access to and
egress from the Iot must be provided from the street where there is less
potential for traffic congestion and for traffic and pedestrians hazards.
Access from other streets may be allowed if it is safe.
F. Where it is necessary to safeguard against hazards to traffic and
pedestrians and/or to avoid traffic congestion; the applicant shall be
responsible for providing traffic controls within public streets.
G. Access ways must be designed and have sufficient capacity to avoid
queuing of entering vehicles on any public street.
14
H. The following criteria must be used to limit the number of driveways
serving a proposed project:
1. No use that generates less than 100 vehicle trips per day shall have
more than one two-way driveway onto a single roadway. Such
driveway must be no greater than 30 feet wide.
2. No use that generates 100 or more vehicle trips per day shall have more
than two points of entry from and two points of egress to a single
roadway. The combined width of all access ways must not exceed 60
feet.
5 Access way Location and Spacing
All access ways must meet the following standards:
A. Private entrances/exits must be located at least 50 feet from the closest
unsignalized intersection and 150 feet from the closest signalized
intersection, as measured from the point of tangency for the corner to
the point of tangency for the access way. This requirement may be
reduced if the shape of the site does not allow conformance with this
standard.
B. Private access ways in or out of a development must be separated by a
minimum of 75 feet where possible.
6 Internal Vehicular Circulation
The layout of the site must provide for the safe movement of passenger, service, and
emergency vehicles through the site to include:
A. Non-residential projects that will be served by delivery vehicles must
provide a clear route for such vehicles with appropriate geometric design to
allow turning and backing.
B. Clear routes of access must be provided and maintained for emergency
vehicles to and around buildings and must be posted with appropriate
signage (fire lane - no parking).
C. The layout and design of parking areas must provide for safe and
convenient circulation of vehicles and pedestrians throughout the lot.
D. All roadways must be designed to harmonize with the topographic
and natural features of the site insofar as practical by minimizing
filling, grading, excavation, or other similar activities which result in
unstable soil conditions and soil erosion, by fitting the development to
the natural contour of the land and avoiding substantial areas of
excessive grade and tree removal, and by retaining existing vegetation
during construction.
E. The road network must provide for vehicular, pedestrian, and cyclist safety,
all season emergency access, snow storage, adequate parking, and delivery
and collection services.
15
7 Parking Layout and Design
Off-street parking must conform to the following standards:
A. Parking areas with more than two parking spaces must be arranged so that
itis not necessary for vehicles to back into the street. Parking to the side
or rear of buildings is encouraged. Parking stalls shall not be directly
accessible from any public way. Ingress and egress to parking areas shall
be limited to driveway entrance.
B.All parking spaces, access drives, and impervious surfaces must be
located at least five feet from any side or rear lot line, except where
standards for buffer yards require a greater distance. No parking spaces
or asphalt type surface shall be located within five feet of the entrance to
any public way.
C. Parking stalls and aisle layout must conform to the following standards:
Parking Skew Stall Depth Aisle
Stall Width Width Width
Angle
90° 9-0" 18%0" 24'-0" two way
60° 3' -6" 10%6" 18%0" 16'-0" one way
only
45° 8'-6" 12'-9" 17'-6" 12'-0" one way
only
30° 8'-6" 17' -0" 17'-0" 12'-0"" one way
only
D. In lots utilizing diagonal parking, the direction of proper traffic flow
must be indicated by signs, pavement markings (required for all paved
parking lots only) or other permanent indications and maintained as
necessary.
E. Parking areas for non-residential uses must be designed to permit each
motor vehicle to proceed to and from the parking space provided for it
without requiring the moving of any other motor vehicles. Double stack
parking may be permitted for resident parking in conjunction with
residential uses if both spaces in the stack are assigned to the occupants
of the same dwelling unit.
F. Provisions must be made to restrict the "overhang" of parked vehicles
when it might restrict traffic flow on adjacent through roads, restrict
pedestrian or bicycle movernent on adjacent walkways, or damage
landscape materials.
8 Pedestrian Circulation
The site plan must provide for a system of pedestrian ways within the development
appropriate to the type and scale of development. This system must connect the major
building entrances/exits with parking areas and with existing sidewalks, if they exist or
are planned in the vicinity of the project.
16
9 Stormwater Management
Adequate provisions must be made for the collection and disposal of all
stormwater that runs off proposed streets, parking areas, roofs, and other
surfaces, through a stormwater drainage system and maintenance plan, which
must not have adverse impacts on abutting or downstream properties and
include:
A. To the extent possible, the plan must retain stormwater on the site
using the natural features of the site.
B. Unless the discharge is directly to the ocean or major river
segment, stormwater runoff systems must detain or retain water
such that the rate of flow from the site after development does
not exceed the predevelopment rate.
C. The applicant must demonstrate that on- and off-site downstream
channel or system capacity is sufficient to carry the flow without
adverse effects, including but not limited to flooding and erosion
of shoreland areas, or that he/she will be responsible for
whatever improvements are needed to provide the required
increase in capacity and/or mitigation.
D. All natural drainage ways must be preserved at their natural
gradients and must not be filled or converted to a closed system
unless approved as part of the site plan review.
E. The design of the stormwater drainage system must provide for
the disposal of stormwater without damage to streets, adjacent
properties, downstream properties, soils, and vegetation.
F. The design of the storm drainage systems must be fully cognizant
of upstream runoff that must pass over or through the site to be
developed and provide for this movement.
G. The biological and chemical properties of the receiving waters
must not be degraded by the stormwater runoff from the
development site. The use of oil and grease traps in manholes, the
use of on-site vegetated waterways and vegetated buffer strips
along waterways and drainage swaies, and the reduction in use of
deicing salts and fertilizers may be required, especially where the
development stormwater discharges into a gravel aquifer area or
other water supply source, or a great pond.
10 Erosion Control
All building, site, and roadway designs and layouts must harmonize with
existing topography and conserve desirable natural surroundings to the
fullest extent practical such that filling; excavation and earth moving
activity must be kept to a minimum. Parking lots on sloped sites must be
terraced to avoid undue cut and fill, and/or the need for retaining walls.
Natural vegetation must be preserved and protected wherever possible.
17
Soil erosion and sedimentation of watercourses and water bodies
shall be minimized by an active program meeting the requirements
of the Maine Erosion and Sediment Control Handbook for Construction:
Best Management Practices, current version as adopted by Maine Department
of Environmental Protection.
11 Water Supply
The development must be provided with a system of water supply that provides
each use with an adequate supply of water.
If the project is to be served by a public water supply, the applicant must
secure and submit a written statement from the supplier that the proposed
water supply system conforms to its design and construction standards, will
not result in an undue burden on the source or distribution system, and will
be installed in a manner adequate to provide needed domestic and fire
protection flaws.
12 Sewage Disposals
The development must be provided with a method of disposing of sewage that
is in compliance with the State of Maine Subsurface Wastewater Disposal
Rules.
When two or more lots or buildings in different ownership share the use
of a common subsurface disposal system, the system must be owned and
maintained in common by an owners association. Covenants in the deeds
for each lot must require mandatory membership in the association and
provide for adequate funding of the association to assure proper
maintenance of the system.
13 Utilities
The development must be provided with electrical, telephone, and
telecommunication service adequate to meet the anticipated use of the
project. New utility lines and facilities must be screened from view to the
extent feasible. If the service in the street or on adjoining lots is
underground, the new service must be placed underground.
14 Natural Features
The landscape must be preserved in its natural state insofar as practical by
minimizing tree removal, disturbance, and compaction of soil, and by
retaining existing vegetation insofar as practical during construction.
Extensive grading and filling must be avoided as far as possible.
18
15 Groundwater Protections
A. The proposed site development and use must not adversely impact the
quantity of groundwater available to abutting properties or to public
water supply systems.
B. There shall be no significant adverse impact on groundwater quality
resulting from a development, either during or after development, with
regard to on-site subsurface wastewater disposal, use of fertilizers,
pesticides or other contaminants, infiltration of stormwater runoff or
harmful liquid, gaseous or solid materials, and such other activities that
pose a potential threat to groundwater quality.
C. The Planning Board reserves the right to request a hydrogeological
evaluation of any applicant, or to hire its own consultant in accordance
with Article VI, Section 3.
D. The applicant may be required to document existing water quality and
quantity conditions and to establish a monitoring system or third-party
monitoring to measure post-development levels of impact on wells or
aquifers with the potential to be impacted by the development.
E. The Planning Board may apply conditions requiring the restriction or
cessation of groundwater extraction during times of 'severe drought" as
defined and reported by the U.S. Drought Monitor, if it is deemed that
the use will pose unreasonable burdens on private or public water
supplies (other than the applicant's) during such times of drought.
16 Water Quality Protections
All aspects of the project must be designed so that:
A. No person shall locate, store, discharge, or permit the discharge
of any treated, untreated, or inadequately treated liquid, gaseous,
or solid materials of such nature, quantity, obnoxiousness,
toxicity, or temperature that may run off, seep, percolate, or
wash into surface or groundwater so as to contaminate, pollute,
or harm such waters or cause nuisances, such as objectionable
shore deposits, floating or submerged debris, oil or scum, color,
odor, taste, or unsightliness or be harmful to human, animal,
plant, or aquatic life.
B. All storage facilities for fuel, chemicals, chemical or industrial
wastes, and biodegradable raw materials, must meet the standards
of the Maine Department of Environmental Protection and the
State of Maine Fire Marshall's Office.
C. If the project is located within the watershed of a 'body of water
most at risk from development' as identified by the Maine
Department of Environmental Protection (DEP), the project must
comply with the standards of the DEP with respect to the export
of total suspended solids and/or phosphorous.
17 Hazardous, Special and Radioactive Materials
The handling, storage, and use of all materials identified by the standards of
all federal or state agencies as hazardous, special or radioactive must be
done in accordance with the standards of these agencies. No flammable or
explosive liquids, solids or gases shall be stored in bulk above ground
unless they are located at least 75 feet from any lot line, or 40 feet in the
case of underground storage. All materials must be stored in a manner and
location which is in compliance with appropriate rules and regulations of the
Maine Department of Public Safety and other appropriate federal, state, and
local regulations.
18 Solid Waste Disposals
The proposed development must provide for adequate disposal of solid wastes.
All solid waste must be disposed of at a licensed disposal facility having
adequate capacity to accept the project's waste.
19 Historic and Archaeological Resources
If any portion of the site has been identified by appropriate state or federal
agencies as containing historic or archaeological resources, the development
must include appropriate measures for protecting these resources, including
but not limited to, modification of the proposed design of the site, timing of
construction, and limiting the extent of excavation.
20 Floodplain Management
If any portion of the site 1s located within a flood hazard area as identified by the
Federal Emergency Management Agency's Flood Insurance Rate Maps, or Flood
Hazard Boundary Maps, or the flood of record, or in the absence of these, by soil
types identified as recent flood plain soils, the Code Enforcement Officer shall
certify that all use and development of that portion of the site will be consistent with
any Town of Prospect Floodplain Management Ordinance in affect at that time, or
if no such ordinance is in effect, with the latest Model Floodplain Ordinance issued
by regulation of the Maine Department of Agriculture, Conservation and Forestry.
21 Noise Limitations
A. Sound shall be measured by a meter set on the A-weighted
response scale, slow response. The meter shall meet the American
National Standards Institute (ANSI $1.4-1961) "Specification for
General Purpose Sound Level Meters". Sound levels shall be
measured at least 4 feet above ground at the property boundary.
Sound data shall be as specific to the permitted activity as
technically possible.
B. Sound shall not exceed forty-two (42) dBA when measured at
20
any occupiable structure existing on the date of application of
the commercial or industrial use, unless the occupiable
structure is owned by the owner/operator of the development
or another person who has waived this requirement by a
written agreement with the applicant or owner/operator.
C. Sound at the property line shall not exceed 55 dBA from 7
a.m. to 6 p.m., and shall not exceed 45 dBA from 6 p.m. to 7
a.m.. unless the occupiable structure is owned by the
owner/operator of the development or another person who has
waived this requirement by a written agreement with the
applicant or owner/operator.
D. On sites abutting a residential use, development construction shall
be staged so that exterior activities are conducted between the
hours of 7 a.m. and 8 p.m.
E. The Planning Board may require additional measures for sound
suppression as reasonably necessary to protect against undue
noise pollution.
22 Exterior Lighting
The proposed development must have adequate exterior lighting to
provide for its safe use during nighttime hours, if such use is
contemplated. Lighting may be used which serves security, safety and
operational needs but which does not directly or indirectly produce
deleterious effects on abutting properties or which would impair the vision of a
vehicle operator on adjacent roadways.
Lighting fixtures must be shielded or hooded so that the lighting elements are
not exposed to normal view by motorists, pedestrians, or from adjacent
dwellings and so that they do not unnecessarily light the night sky. Direct or
indirect illumination must not exceed 0.5 foot-candles at the lot line or upon
abutting residential properties. All exterior lighting, except security lighting,
must be turned off between 11 P.M. and 6 A.M. unless located on the site of a
commercial or industrial use which is open for business during that period.
ARTICLE IX - POST-APPROVAL ACTIVITIES
1 Limitation of Approval
Substantial construction of the improvements covered by any site plan
approval must be commenced within 12 months of the date upon which the
approval was granted, and substantially completed within 24 months of the
date upon which the approval was granted. If construction has not been
substantially commenced or substantially completed within the specified
periods, the approval shall be null and void. The applicant may request an
extension of the applicable deadline prior to the expiration of the period.
Such request must be in writing and must be made to the Planning Board.
21
The Planning Board may grant up to two six-month extensions to the
periods if the approved plan conforms to the ordinances in effect at the time
the extension is granted and any and all federal and state approvals and
permits are current.
2 Incorporation of Approved Plan
All construction activities must conform to the approved plan, including any
conditions of approval and minor changes approved by the Code
Enforcement Officer to address field conditions. Any changes approved by
the Code Enforcement Officer shall be in writing and made part of the
project file.
3 Submission of As-Built Plans
Any project involving the construction of more than 20,000 square feet of
gross floor area or 50,000 square feet of impervious surface, must provide
the Code Enforcement Officer with a set of construction plans showing the
building(s) and site improvements as actually constructed on the site. These
"as-built" plans must be submitted within 30 days of the issuance of a
certificate of occupancy for the project or occupancy of the building. The
as-built plans shall be made part of the project file.
4 Minor Changes to Approved Plans
Minor changes in approved plans necessary to address field conditions may be
approved by the Code Enforcement Officer provided that any such change does
not affect compliance with the standards or alter the essential nature of the
proposal or any approved project element. The Code Enforcement Officer must
endorse any such change in writing on the approved plan. Any changes approved
by the Code Enforcement Officer shall be in writing and made part of the project
file.
5 Amendments to Approved Plans
Approvals of site plans are dependent upon and limited to the proposals and
plans contained in the application and supporting documents submitted and
affirmed to by the applicant. Any variation from the plans, proposals, and
supporting documents, except minor changes that do not affect approval
standards, shall be presented to the Planning Board for review and approval.
22
ARTICLE X - ENFORCEMENTS AND VIOLATIONS
| Nuisances
Any violation of this Ordinance shall be deemed to be a nuisance.
2 Code Enforcement Officer
A. It shall be the duty of the Code Enforcement Officer to
enforce the provisions of this Ordinance. If the Code
Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing
the person responsible for such violation, indicating the
nature of the violation, and ordering the action necessary to
correct it, including discontinuance of illegal use of land,
buildings or structures, or work being done, removal or
discontinuance of the illegal use of land, buildings or
structures, and abatement of nuisance conditions. A copy of
such notices shall be submitted to the Select Board and be
maintained as a permanent record.
B. The Code Enforcement Officer shall conduct on-site inspections
as necessary to ensure compliance with all applicable approvals
and conditions attached to permit approvals, as well as any other
applicable ordinances or laws. The Code Enforcement Officer
shall have the authority to investigate all complaints of alleged
violations of this Ordinance.
C. The Code Enforcement Officer shall keep a complete record
of all essential transactions of the office, including
applications submitted, permits granted or denied, variances
granted or denied, revocation actions, revocation of permits,
appeals, court actions, violations investigated, violations
found, and fees collected.
D. Legal Actions
When the above action does not result in the correction or
abatement of the violation or nuisance condition, the Select
Board, upon notice from the Code Enforcement Officer, may, in
their discretion, institute any and all actions and proceedings,
either legal or equitable, including seeking injunctions of
violations and the imposition of fines, that may be appropriate
or necessary to enforce the provisions of this Ordinance in the
name of the Town of Prospect. The Select Board, or their
authorized agent, are hereby authorized to enter into
administrative consent agreements for the purpose of
eliminating violations of this Ordinance and recovering fines
without Court action. Such agreements shall not allow an illegal
structure or use to continue unless there is clear and convincing
evidence that wy 5 illegal structure or use was
constructed or conducted as a direct result of erroneous advice
given by an authorized municipal official and there is no
evidence that the owner acted in bad faith, or unless the removal
of the structure or use will result in a threat or hazard to public
health and safety or will result in substantial environmental
damage.
E. Fines
Any person, including but not limited to a landowner, a
landowner's agent, or a contractor, who violates any
provision or requirement of this Ordinance shall be
penalized in accordance with 30-A, M.R.S.A. Section 4452.
ARTICLE XI - APPEAL OF PLANNING BOARD
ACTIONS | Administrative Appeal
Any person aggrieved by an action from determinations of the Planning
pursuant to this Ordinance may file an application for appeal. Decisions made
by the Code Enforcement Officer in the administration or enforcement of this
Ordinance may not be appealed to the Board of Appeals.
A. All appeals shall be in writing and submitted within 30 days of
the official written decision of the Planning Board. The appellant
shall file this appeal with the Chair of the Board of Appeals, who
shall issue a dated receipt within 7 days, and notify the appellant
in writing that the application is either complete or incomplete.
The Chair shall specify what additional material is needed, if
any, to make the application complete.
B. A fee to accompany applications for appeal shall be determined by
the Town of Prospect Board of Selectmen.
C. The Board of Appeals shall, upon complete written application of
an aggrieved party, and after public notice, hear appeals within 30
days of such application. Such hearing shall be held in
accordance with 30-A M.R.S.A. § 2691, except that review shall
be limited to the record before the Planning Board, and no new
evidence or testimony shall be accepted. The Appeals Board
shall cause notice of the date, time and place of public hearing
with the general nature of the question involved to be given in
writing to the applicant of the appeal. Notice shall be published
in a newspaper of general circulation in the Town of Prospect,
Maine at least two times. The date of the first such publication
shall be at least 14 days prior to the hearing. The Board shall
also cause notice of the hearing be given to the Selectman, the
Planning Board, the Code Enforcement Officer.
D. Following such hearing the Board of Appeals may reverse the
decision of the Planning Board onty upon a finding in fact that the
24
decision of the Planning Board is clearly contrary to specific
provisions of this Ordinance. The Board of Appeals shall render a
decision in writing to the applicant, Planning Board Chair, Code
Enforcement Officer, and the Selectmen within 30 days of the
appeal hearing.
2 Appeals to Superior Court
Any aggrieved party, having proper standing, may appeal any decision of the
Appeals Board under this Ordinance to the Superior Court of Waldo County,
within thirty days of a written decision in accordance with Maine State Law.
ARTICLE XII - AMENDMENTS TO THE ORDINANCE
| Initiation of Amendment
An amendment to this ordinance may be initiated by:
A.The Planning Board (provided that a majority of the Board has so
voted), or
B.Request of the Selectmen to the Planning Board, or
C. Written petition to the Selectmen bearing signatures of registered
voters of the Town of Prospect, Maine numbering at least 10% of
the number who voted in the jast gubernatorial election.
2 Adoption of Amendment
All proposed amendments to this ordinance shall be referred to the Planning
Board for their recommendation. The Pianning Board may hold a public
hearing on any proposed amendment. Within 30 days of receiving a proposed
amendment or within 30 days of the public hearing, if one is held, the
Planning Board shall make known their recommendation to the Selectmen
and the Town. After receiving the recommendation of the Planning Board, the
amendment shall be voted on by the voters of the Town of Prospect, Maine at
a Town Meeting, a simple majority vote being required for adoption.
ARTICLE XIII - SEVERABILITY
Should any article or provision of the ordinance be declared by the courts of the
State of Maine or the courts of the United States to be invalid, such decisions
shall not invalidate any other article or provision of the ordinance.
This ordinance shall in no way impair or remove the necessity of compliance
with any other rule, regulation, bylaw, permit or provision of law. Where this
ordinance provides a greater restriction upon the use of the land, buildings or
structures, the provisions of this ordinance shall control.
25
ARTICLE XIV- AVAILABILITY
A certified copy of this ordinance shall be filed with the Town Clerk and shall
be accessible to any member of the public. Copies shall be made available to
the public at reasonable cost at the expense of the person making the request.
Notice of the availability of this ordinance shall be posted.
ARTICLE XV - DEFINITIONS
1 Construction of Language
In general, all words and terms used in this Ordinance shall have customary
dictionary meanings. More specifically, certain words and terms shall be
described below.
2 Relationship to Other Town Ordinances
Where there is a conflict between a definition contained in this Ordinance and a
definition contained in any other Town ordinances, the definition provided
herein shall apply for purposes of the Ordinance.
3 Definitions
Abutting Property: Any lot which is physically contiguous with the subject lot even if
only at a point and any lot which is located directly across a street or right-of-way from
the subject lot such that the extension of the side lot lines of the subject lot would touch
or enclose the abutting property.
Accessory Building: A detached, subordinate building, the use of which is clearly
incidental and related to that of the principal building or use of the land, and which is
located on the same lot as that of the principal building or use.
Accessory Structure or Use: A use or structure that is incidental and subordinate to
the principal use or structure. Accessory uses, when aggregated shall not
subordinate the principal use of the lot. A deck or similar extension of the principal
structure or a garage attached to the principal structure by a roof, or a common wall is
considered part of the principal structure.
Aggrieved Party: An owner of land whose property is directly or indirectly affected
by the granting or denial of an approval under this ordinance; a person whose land
abuts land for which approval has been granted; or any other person or group of
persons who have suffered particularized injury as a result of the granting or denial of
such approval.
Arterial: A controlled access road or a street or road with traffic signals at important
intersections and/or stop signs on side streets or which is functionally classified by
the Maine Department of Transportation, 6 asan arterial.
Building: Any permanent structure, having one or more floors and a roof, which is
used for the housing or enclosure of persons, animals, or property. When any
portion thereof is separated by a division wall without opening, then each such
portion shall be deemed a separate building.
Building Footprint: The area covered by a building measured from the exterior
surface of the exterior walls at grade level exclusive of cantilevered portions of the
building. Where the building is elevated above grade level on posts or similar
devices, the building footprint is the area the building would cover if it were located
at ground level.
Change From One Category of Nonresidential Use to Another Category of
Nonresidential Use: A change in the type of occupancy of a nonresidential building
or structure, or a portion thereof, such that the basic type of use is changed, such as
from retail to office or storage to a restaurant, but not including a change in the
occupants.
Collector Street: A street that collects traffic from local streets and connects with
arterials or a street or road functionally classified as a collector by the Maine
Department of Transportation.
Commercial Use: the use of lands, buildings, or structures, other than a "home
occupation," defined below, the intent and result of which activity is the production of
income from the buying and selling of goods and/or services, exclusive of rental of
residential buildings and/or dwelling units.
Enlargement or Expansion of Structure: An increase of the building area or volume
and/or increase in the height of the structure beyond its present highest point.
Alterations of existing buildings which are required in order to meet the
requirements of the Americans with Disabilities Act (ADA) and/or the State Fire
Code are not considered to be enlargements or expansions of a structure and are not
required to meet otherwise applicable setback requirements, provided the alterations
are the minimum necessary to satisfy the ADA and/or State Fire Code.
Enlargement or Expansion of Use: Any intensification of use in time, volume, or
function, whether or not resulting from an increase in the footprint, height, floor area,
land area or cubic volume occupied by a particular use. Increases, which are required in
order to meet the requirements of the Americans with Disabilities Act and/or the State
Fire Code, are not considered to be enlargements or expansions of use.
Fisheries, Significant fisheries: Areas identified by a governmental agency such as the
Maine Department of Inland Fisheries and Wildlife, Atlantic Salmon Authority, or
Maine Department of Marine Resources as having significant value as fisheries.
Floor Area: The sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls.
27
Groundwater: All of the water found beneath the surface of the ground. For purposes of
aquifer protection, this term refers to the subsurface water present in aquifers and
recharge areas.
Historic or Archeological Resources: Areas identified by a governmental agency such
as the Maine Historic Preservation Commission as having significant value as an
historic or archaeological resource.
Home Occupation: This term shall include those occupations carried
on in a dwelling unit or structure accessory to the dwelling unit which
are:
a. primarily conducted within such unit or structure,
b. clearly incidental and secondary to the use of the dwelling for residential
purposes and do not change the character thereof, and
c. carried on exclusively by a member or members of the household
residing in the dwelling unit, except, however, three additional employees,
not residents of the dwelling unit nor members of the household, are
additionally included.
The term shall also apply to those occupations which do not satisfy one or more of the
three limits mentioned above, but which exceed those limits only for a continuous period
of not more than 90 days and such that this excess specifically results from the seasonal
nature of the occupation.
The traffic generated by such occupation shall not exceed 50 vehicle trips per day or
create a traffic hazard. Any waste or hazardous waste shall be disposed of in
accordance with DEP regulations. Should the Planning Board determine that the
operation no longer fits the definition of a home occupation, it shall be subject to site
plan review.
Impervious Surface: The area covered by buildings and associated constructed facilities,
areas which have been or will be covered by a low-permeability material, such as asphalt
or concrete, and areas such as gravel roads and unpaved parking areas, which have been
or will be compacted through design or use to reduce their permeability. Common
impervious surfaces include, but are not limited to, roof tops, walkways, patios,
driveways, parking lots or storage areas, concrete or asphalt paving, gravel roads, packed
earthen materials, and oiled, macadam, or other surfaces which similarly impede the
natural infiltration of stormwater.
Industrial Use: Development or use of premises for assembling, fabricating, finishing,
manufacturing, distilling, packaging, or processing. These include but are not limited to
assembly plants, fuel depots, laboratories, power plants, pumping stations, repair shops,
sawmills, wood processing, and the extraction or processing of minerals. Industrial
Development shall not include Timber Harvesting except to the extent it includes
construction or use of structures or impervious surfaces that otherwise qualify it as a
Minor or Major Development pursuant to this Ordinance.
28
Local Street: A public street or road that is not identified as an arterial or collector. A
local street includes a proposed street shown on an approved and recorded
subdivision.
Lot Area: The area of land enclosed within the boundary lines of a lot, minus land below
the normal high-water line of a water body or upland edge of a wetland and areas
beneath roads serving more than two lots.
Multi-Family Dwelling: A building containing three or more dwelling units, such
buildings being designed for residential use and occupancy by three or more families
living independently of one another, with the number of families not exceeding the
number of dwelling units. The term also includes commercial space as the principal
use.
Natural Areas and Natural Communities, Unique Natural Areas and Natural
Communities: Areas identified by a governmental agency such as the Maine Department
of Conservation Natural Areas Program as having significant value as a natural area.
Occupiable Structure: A structure existing as of the date of an application under this
Ordinance that is intended for or capable of being used as a residence, school, hospital,
house of worship, public library or other use that is customarily frequented by the
public.
Principal Structure: A building other than one which is used for purposes wholly
incidental or accessory to the use of another building or use on the same premises.
Principal Use: A use other than one that is wholly incidental or accessory to another use
on the same premises. Recharge Area: Area composed of permeable, porous material
through which precipitation and surface water infiltrate and directly replenish
groundwater in aquifers.
Setback, Front: An open area extending the entire width of a lot from lot sideline
to lot sideline and extending in depth at a right angle from the street right-of-way
to such depth as specified. Such area shall be unoccupied and unobstructed by any
building from the ground upward.
Setback, Rear: An open area extending the entire width of a lot from lot sideline
to lot sideline and extending at a right angle from the rear property line of such lot
to such depth as specified. Such area shall be unoccupied and unobstructed by any
building from the ground upward.
Setback, Side: An open area extending along each sideline of a lot between the
front setback and the rear setback on such lot and extending at a right angle from
the sidelines of such lot to such depth as specified. Such area shall be unoccupied
and unobstructed by any building from the ground upward.
29
Structure: Anything constructed or erected, which requires location on the ground
or attached to something having a location on the ground, but not including a tent
or vehicle.
Substantial Enlargement or Expansion of Use: An enlargement or expansion
where the proposed intensification or increase to a structure, development or use
is more than 15% greater than the existing or previously approved structure,
development, or use.
Substantially Commenced, Substantially Completed: Construction shall be
considered to be substantially commenced when any work beyond the state of
excavation, including but not limited to, the pouring of a slab or footings, the
installation of piles, the construction of columns, or the placement of a
manufactured home on a foundation has begun. Construction shall be
considered to be substantially completed when it has been completed to the
point where normal functioning, use, or occupancy can occur without concern
for the general health, safety, and welfare of the cccupant and the general
public. At a minimum it shall include the completion of no less than 70% of
the costs of the proposed improvements within a development and shall
include permanent stabilization and/or re-vegetation of areas of the site that
were disturbed during construction.
Surface Water: Surface water is water that collects on the surface of the
ground, the top layer of the surface water such as a pond, lake or ocean.
Timber harvesting: The cutting and removal of timber for the primary purpose of selling
or processing forest products, including the construction and maintenance of roads used
primarily for timber harvesting and other activities conducted to facilitate timber
harvesting.
Use: The purpose for which land or a building is arranged, designed, or intended,
or for which either land or a building is or may be occupied or maintained.
Vegetation: All live trees, shrubs, ground cover, and other plants.
Wildlife Habitat, Significant Wildlife Habitat: Areas identified by a governmental
agency such as the Maine Department of Inland Fisheries and Wildlife as having
significant value as habitat for animals.
30