This is the exact embedded text of the captured official document.
Snapshot c2ec9ff47b89 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
1
CHANGES TO TOWN OF RANDOLPH
SHORELAND ZONING ORDINANCE
AS A RESULT OF SPECIAL TOWN MEETING
HELD MAY 17, 2005
* = CHANGES
Section 17. Definitions (old page 36 -- new page 36-a)
Non-conforming use -- use of buildings, structures, premises, land or parts thereof
which is not permitted in the district which it is situated, but which is allowed to remain
solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect. "ADDED" Increase in the nonconformity of the structure --
end result when a structure is added to or expanded within an existing nonconforming
setback distance which said addition or expansion results in a physical reduction in the
nonconforming setback distance.
A true copy of changes adopted at Special Town Meeting of May
17, 2005.
Attest:
2
3
ORDINANCE NO. 691-3
Shoreland Zoning Ordinance for the Municipality of
RANDOLPH, MAINE
-NOTICE-
BEFORE STARTING CERTAIN ACTIVITIES AND LAND USES
PERMITS ARE REQUIRED BY THIS ORDINANCE
ALL WORK IN THE AREA OF THE 100 YEAR FLOOD PLAIN REQUIRES
A FLOOD HAZARD DEVELOPMENT PERMIT IN ADDITION TO PERMITS REQUIRED
BY THIS ORDINANCE
PRIOR TO STARTING ANY PROJECT IN THE SHORELAND ZONE YOU SHOULD CHECK WITH ALL
APPROPRIATE AGENCIES TO DETERMINE IF THEY ALSO REQUIRE PERMITS
SOME OF THE AGENCIES THAT MIGHT REQUIRE PERMITS ARE
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION
UNITED STATES ARMY CORPS OF ENGINEERS
ENACTED: June 26, 1991
RETYPED AUGUST 2020
4
Section 1. Purposes
The purposes of this Ordinance are to further maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic
life, bird and other wildlife habitat; to protect buildings and lands from flooding and accelerated
erosion; to protect archaeological and historic resources; to protect commercial fishing and
maritime industries; to protect freshwater and coastal wetlands; to control building sites,
placement of structures and land uses; to conserve shore cover, and visual as well as actual
points of access to inland and coastal waters; to conserve natural beauty and open space; and to
anticipate and respond to the impacts of development in shoreland areas.
Section 2. Authority
This Ordinance has been prepared in accordance with the provisions of Title 38 Sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A).
Section 3. Applicability
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
normal high-water line of the Kennebec River and Togus Stream; and within 75 feet,
horizontal distance, of the normal high-water line of Togus Brook. This Ordinance also
applies to any structure built on, over or abutting a dock, wharf or pier, or other
structure extending beyond the normal high-water line of these water bodies.
The areas described above which are located in the flood plains along the Kennebec
River, Togus Stream and Togus Brook defined by the 100 year flood plain as designated
on the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or
Flood Hazard Boundary Maps are subject to the regulations of the FLOODPLAIN
MANAGEMENT ORDINANCE # 41487-3 FOR THE TOWN OF RANDOLPH, as enacted
April 14, 1987, in addition to the requirements of this ordinance. Separate applications
and permits may be required for items in these areas under both ordinances.
Section 4. Effective Date and Repeal of Formerly Adopted Ordinance
This Ordinance, which was adopted by the Town Meeting on June 26, 1991, shall not be
effective unless approved by the Commissioner of the Department of Environmental
Protection. A certified copy of the Ordinance, attested and signed by the Town Clerk,
shall be forwarded to the Commissioner of the Department of Environmental Protection
for approval. If the Commissioner of the Department of Environmental Protection fails
to act on this Ordinance within forty-five (45) days of its receipt of the Ordinance, it shall
be deemed approved. Upon approval of this Ordinance, the Shoreland Zoning
Ordinance previously adopted on April 14, 1987 is hereby repealed.
Any application for a permit submitted to the municipality within the forty-five (45) day
period shall be governed by the terms of this Ordinance is approved by the
Commissioner of the Department of Environmental Protection.
5
Section 5. Availability
A certified copy of this Ordinance shall be filed with the Town Clerk and shall be
accessible to any member of the public. Copied shall be made available to the public at
a cost of ten (10) dollars each, at the expense of the person making the request. Notice
of availability of this Ordinance shall be posted.
Section 6. Severability
Should any section or provision of this Ordinance be declared by the courts to be invalid,
such decision shall not invalidate any other section or provision of the Ordinance.
Section 7. Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another
provision of this Ordinance or of any other Ordinance, regulation or statute, the more
restrictive provision shall control.
Section 8. Amendments
This Ordinance may be amended by majority vote of a Town Meeting. Copies of
amendments, attested and signed by the Town Clerk, shall be submitted to the
Commissioner of the Department of Environmental Protection following adoption by
the Town Meeting and shall not be effective unless approved by the Commissioner of
the Department of Environmental Protection. If the Commissioner of the Department
of Environmental Protection fails to act on any amendment within forty-five (45) days of
the Commissioner's receipt of the amendment, the amendment is automatically
approved. Any application for a permit submitted to the Town within the forty-five (45)
day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner of the Department of Environmental Protection.
Section 9. Districts and Zoning Map
A. Official Shoreland Zoning Map
The areas to which this Ordinance is applicable are hereby divided into the following
districts as shown on the Official Shoreland Zoning Map which is made a part of this
Ordinance:
1. Resource Protection
2. Limited Residential
3. Limited Commercial
4. General Development
5. Commercial Fisheries/Maritime Activities
6
6. Stream Protection
B. Scale of Map
The official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch =
2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map
The official Shoreland Zoning Map shall be certified by the attested signature of the
Town Clerk and shall be located in the Town Office.
D. Changes to the Official Shoreland Zoning Map
If amendments, in accordance with Section 8, are made in the district boundaries or
other matter portrayed on the Official Shoreland Zoning Map, such changes shall be
made on the Official Shoreland Zoning Map within thirty (30) days after the amendment
has been approved by the Commissioner of the Department of Environmental
Protection.
Section 10. Interpretation of District Boundaries
Unless otherwise set forth on the Official Shoreland Zoning Map or in the district
descriptions listed in Section 18, district boundary lines are property lines, the
centerlines of streets, roads and rights of way, and the boundaries of the shoreland area
as defined herein. Where uncertainty exists as to the exact location of district boundary
lines, the Board of Appeals shall be the final authority as to location.
The depiction of the boundaries of the shoreland zones on the official shoreland zoning
map for the Town of Randolph is merely illustrative of their general location. The exact
boundaries of the zone shall be determined by on-site inspection and measurement
from the normal high-water line, in conjunction with the zone descriptions contained in
Section 18.
Section 11. Land Use Requirements
Except as hereinafter specified, no building, structure or land shall hereafter be used or
occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in
conformity with all of the regulations herein specified for the district in which it is
located, unless a variance is granted.
7
Section 12. Non-conformance
A. Purpose
It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before June 26, 1991 shall be allowed to continue,
subject to the requirements set forth in this section.
B. General
1. Transfer of Ownership: Non-conforming structures, lots, and uses may be
transferred, and the new owner may continue the non-conforming use or
continue to use the non-conforming structure or lot, subject to the provisions of
this Ordinance.
2. Repair and Maintenance: This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures including
repairs or renovations which do not involve expansion of the non-conforming
use or structure, and such other changes in a non-conforming use or structure as
federal, state, or local building and safety codes may require.
NOTE:
See Section 17 for the definitions of non-conforming structures, non-conforming
uses and non-conforming lots.
C. Non-Conforming Structures
1. Expansions: A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new
structure, if such addition or expansion does not increase the non-conformity of
the structure.
Further Limitations:
a. After January 1, 1989 if any portion of a structure is less than the required
setback from the normal high-water line of a water body or upland edge of a
wetland, that portion of the structure shall not be expanded in floor area or
volume, by 30% or more, during the lifetime of the structure.
b. Construction or enlargement of a foundation beneath the existing structure
shall not be considered an expansion of the structure provided; that the
structure and new foundation are placed such that the setback requirement
is met to the greatest practical extent as determined by the Planning Board,
basing its decision on the criteria specified in subsection 2. Relocation,
below; that the completed foundation does not extend beyond the exterior
dimensions of the structure; and that the foundation does not cause the
structure to be elevated by more than three (3) additional feet.
8
c. No structure which is less than the required setback from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland
shall be expanded toward the water body, tributary stream, or wetland.
2. Relocation: A non-conforming structure may be relocated within the boundaries
of the parcel on which the structure is located provided that the site of
relocation conforms to all setback requirements to the greatest practical extent
as determined by the Planning Board, and provided that the applicant
demonstrates that the present subsurface sewage disposal system meets the
requirements of State law and the State of Maine Subsurface Wastewater
Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that
causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board shall consider the size of the lot, the slope of
the land, the potential for soil erosion, the location of other structures on the
property and on adjacent properties, the location of the septic system and other
onsite soils suitable for septic systems, and the type and amount of vegetation to
be removed to accomplish the relocation.
3. Reconstruction or Replacement: Any non-conforming structure which is located
less than the required setback from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland and which is removed, or
damaged or destroyed by more than 50% of the market value of the structure
before such damage, destruction or removal, may be reconstructed or replaced
provided that a permit is obtained within one year of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is
in compliance with the water setback requirement to the greatest practical
extent as determined by the Planning Board in accordance with the purposes of
this Ordinance. In no case shall a structure be reconstructed or replaced so as to
increase its non-conformity.
Any non-conforming structure which is damaged or destroyed by 50% or less of
the market value of the structure, excluding normal maintenance and repair,
may be reconstructed in place with a permit, from the code enforcement officer.
In determining whether the building reconstruction or replacement meets the
water setback to the greatest practical extent the Planning Board shall consider
in addition to the criteria in paragraph 2 above, the physical condition and type
of foundation present, if any.
4. Change of Use of a Non-conforming Structure
9
The use of a non-conforming structure may not be changed to another use
unless the Planning Board after receiving a written application determines that
the new use will have no greater adverse impact on the water body or wetland,
or on the subject or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board
shall require written documentation from the applicant, regarding the probable
effects on public health and safety, erosion and sedimentation, water quality,
fish and wildlife habitat, vegetative cover, visual and actual points of public
access to waters, natural beauty, flood plain management, archaeological and
historic resources, and commercial fishing and maritime activities, and other
functionally water-dependent uses.
D. Non-conforming Uses
1. Expansions: Expansions of non-conforming uses are prohibited, except that non-
conforming residential uses may, after obtaining a permit from the Planning
Board, be expanded within existing residential structures or within expansions of
such structures as permitted in Section 12(C)(1)(a) above.
2. Resumption Prohibited: A lot, building or structure in or on which a non-
conforming use is discontinued for a period exceeding one year, or which is
superseded by a conforming use, may not again be devoted to a non-conforming
use except that the Planning Board may, for good cause shown by the applicant,
grant up to a one year extension to that time period. This provision shall not
apply to the resumption of a use of a residential structure provided that the
structure has been used or maintained for residential purposes during the
preceding five (5) year period.
3. Change to Use: An existing non-conforming use may be changed to another
non-conforming use provided that the proposed use has no greater adverse
impact on the subject and adjacent properties and resources, including water
dependent uses in the CFMA district, than the former use, as determined by the
Planning Board. The determination of no greater adverse impact shall be made
according to criteria listed in Section 12 (C) (4) above.
E. Non-conforming Lots
1. Non-conforming Lots: A non-conforming lot of record as of June 26, 1991 or
amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any
other lot in the same ownership, and that all provisions of this Ordinance except
lot size and frontage can be met. Variances relating to setback or other
requirements not involving lot size and frontage shall be obtained by action of
the Board of Appeals.
10
2. Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or
joint ownership of record at the time of adoption for this Ordinance, if all or part
of the lots do not meet the dimensional requirements of this Ordinance, and if a
principal use or structure exists on each lot, the non-conforming lots may be
conveyed separately or together, provided that the State Minimum Lot Size Law
and Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on
June 26, 1991, each may be sold on a separate lot provided that the above
referenced law and rules are complied with. When such lots are divided each lot
thus created must be as conforming as possible to the dimensional requirements
of this Ordinance.
3. Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or
parcels are in single or joint ownership of record at the time of or since adoption
or amendment of this Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments, and if
one or more of the lots are vacant or contain no principal structure the lots shall
be combined to the extent necessary to meet the dimensional requirements.
Section 13. Establishment of Districts
A. Resource Protection District
The Resource Protection District includes areas in which development would adversely
affect water quality, productive habitat, biological ecosystems, or scenic and natural
values. This district shall include the following areas when they occur within the limits
of the shoreland zone, exclusive of the Stream Protection District, except that areas
which are currently developed and areas which meet the criteria for the Limited
Commercial, General Development, or Commercial Fisheries/Maritime Activities
Districts need to not be included within the Resource Protection District.
1. Areas of two or more contiguous acres with sustained slopes of 20% or
greater.
2. Land areas along the Kennebec River and Togus Stream subject to severe
bank erosion, undercutting, or river bed movement and lands adjacent to
tidal waters which are subject to severe erosion or mass movement.
B. Limited Residential District
The Limited Residential District includes those areas suitable for residential and
recreational development. It includes areas other than those in the Resource Protection
District, or Stream Protection District, and areas which are used less intensively than
11
those in the Limited Commercial District, the General Development District, or the
Commercial Fisheries/Maritime Activities District.
C. Limited Commercial District
The Limited Commercial District includes areas of mixed, light commercial and
residential uses, exclusive of the Stream Protection District, which should not be
developed as intensively as the General Development District. This district includes
areas of two or more contiguous acres in size devoted to a mix of residential and low
intensity business and commercial uses. Industrial uses are prohibited.
D. General Development District
The General Development District includes the following types of areas:
1. Areas of two or more contiguous acres devoted to commercial, industrial or
intensive recreational activities, or a mix of such activities, including but not
limited to the following:
a. Areas devoted to manufacturing, fabricating or other industrial activities;
b. Areas devoted to wholesaling, warehousing, retail trade and service
activities, or other commercial activities; and
c. Areas devoted to intensive recreational development and activities, such as,
but not limited to amusement parks, race tracks and fairgrounds.
2. Areas otherwise discernible as having patterns of intensive commercial,
industrial or recreational uses.
Portions of the General Development District may also include residential development.
However, no area shall be designated as a General Development District based solely on
residential use.
E. Commercial Fisheries/Maritime Activities District
The Commercial Fisheries/Maritime Activities District includes areas where the existing
predominant pattern of development is consistent with the allowed uses for this district
as indicated in the Table of Land Uses, Section 14, and other areas which are suitable for
functionally water-dependent uses, taking into consideration such factors as:
1. Shelter from prevailing winds and waves;
2. Slope of the land within 250 feet, horizontal distance, of the normal high-
water line;
3. Depth of the water within 150 feet, horizontal distance, of the shoreline;
12
4. Available support facilities including utilities and transportation facilities; and
5. Compatibility with adjacent upland uses.
F. Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of Togus Brook, exclusive of those
areas within two-hundred and fifty (250) feet, horizontal distance, of the normal high-
water line of the Kennebec River. Where Togus Brook and its associated shoreline area
is located within two-hundred and fifty (250) feet, horizontal distance, of the Kennebec
River, that land area shall be regulated under the terms of the shoreland district
associated with the Kennebec River.
Section 14. Table of Land Uses
All land use activities, as indicated in Table 1 (on Page 11), Land Uses in the Shoreland
Zone, shall conform with all of the applicable land use standards in Section 15. The
district designation for a particular site shall be determined from the Official Shoreland
Zoning Map.
Key to Table 1:
Y - Allowed (no permit required but the use must comply with all applicable
land use standards.)
N - Prohibited
PB - Requires permit issued by the Planning Board
CEO - Requires permit issued by the Code Enforcement Officer
LPI - Requires permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection
LR - Limited Residential
LC - Limited Commercial
GD - General Development
CFMA - Commercial Fisheries/Maritime Activities
SP - Stream Protection
13
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICTS
SP
RP
LR
LC
GD
CFMA
1. Non- intensive recreational uses not requiring
Structures such as hunting, fishing and hiking
Y
Y Y Y Y Y__
2. Motorized vehicular traffic on existing roads and trails Y
Y Y Y Y Y
3. Forest management activities except for timber
harvesting Y Y Y Y Y Y_
4. Timber harvesting Y CEO1 Y Y Y Y_
5. Clearing of vegetation for approved construction and
other allowed uses
CEO CEO1 Y Y Y Y_
6. Fire prevention activities Y Y Y Y Y Y_
7. Wildlife management practices Y Y Y Y Y Y_
8. Soil and water conservation practices Y Y Y Y Y Y_
9. Mineral exploration N Y2 Y2 Y2 Y2 Y_
10. Mineral extraction including sand & gravel extraction N PB3 PB PB PB PB
11. Surveying and resource analysis Y Y Y Y Y Y_
12. Emergency operations Y Y Y Y Y Y_
13. Agriculture Y PB Y Y Y Y_
14. Aquaculture PB PB PB Y Y Y_
15. Principal structures and uses
A. One and two family residential PB4 N CEO CEO CEO N_
B. Multi-unit residential N N PB PB PB N_
C. Commercial N N N PB PB PB5
D. Industrial N N N N PB N_
E. Government and Institutional N N N PB PB PB5
F. Small non-residential facilities for educational,
Scientific, or nature interpretation purposes PB4 PB CEO CEO CEO PB5
16. Structures accessory to allowed uses PB4 PB CEO CEO Y Y_
17. Piers, docks, wharfs, bridges, and other structures and
uses extending over or below the normal high-water line
a. Temporary CEO CEO CEO CEO CEO CEO
b. Permanent PB PB PB PB PB PB5
18. Conversions of seasonal residences to year round
residences LPI N LPI LPI LPI N_
19. Home occupations PB N PB CEO Y Y_
20. Private sewage disposal systems for allowed uses LPI N LPI LPI LPI LPI
21. Essential services PB6 PB6 PB PB PB PB
22. Service drops, as defined, to allowed uses Y Y Y Y Y Y_
23. Public and private recreational areas involving minimal
structural development PB PB PB CEO CEO CEO_
24. Individual, private camp sites CEO CEO CEO CEO CEO CEO_
25. Campgrounds N N7 PB PB PB N_
26. Road and driveway construction PB N8 PB PB PB PB5
27. Parking facilities PB N PB PB PB PB
28. Marinas CEO CEO Y Y Y Y_
29. Filling & earthmoving of less than (<) 10 cubic yards CEO CEO Y Y Y Y_
30. Filling & earthmoving of more than (>) 10 cubic yards PB PB CEO CEO CEO CEO
31. Signs Y Y Y Y Y Y_
32. Uses similar to allowed uses CEO CEO CEO CEO CEO CEO
33. Uses similar to uses requiring a CEO permit CEO CEO CEO CEO CEO CEO
34. Uses similar to uses requiring a PB permit PB PB PB PB PB PB
14
1 In RP not permitted within 75 feet of the normal high water line, except to remove safety
hazards.
2 Requires permit from Code Enforcement Officer if more than 100 square feet of surface
area, in total, is disturbed.
3 In RP not permitted in areas so designated because of wildlife value.
4 Provided that a variance from the setback requirement is obtained from the Board of
Appeals.
5 Functionally water-dependent uses and uses accessory to such water dependent uses only
(See Section 17. Definitions).
6 See further restrictions in Section 15(L)(2) on page 20.
7 Except when area is zoned for resource protection due to flood plain criteria in which case
a permit is required from the PB.
8 Except to provide access to permitted uses within the district, or where no reasonable
alternative route or location is available outside the RP area, in which case a permit is
required from the PB.
NOTE: A person performing any of the following activities shall require a permit from the
Department of Environmental Protection pursuant to Title 38 M.R.S.A., section 480-C, if the
activity occurs in, on, over or adjacent to any river, stream or brook and operates in such a
manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other
materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
NOTE: ANY work in the flood plain area also requires a Flood Hazard Development Permit
under the Floodplain Management Ordinance 41487-3 for the Town of Randolph, Maine in
addition to any permits required under this ordinance.
NOTE: Other Town ordinances may have stricter requirements than those contained herein,
pertaining to setbacks, two family and multi-family residences. The stricter of the
requirements applies (See Section 7., page 3).
15
Section 15. Land Use Standards
All land use activities within the shoreland zone shall conform with the following
provisions, if applicable.
A. Minimum Lot Standards
1. Minimum Lot Area Minimum Shore
(sq. ft.) Frontage (ft.)
Residential per dwelling unit
a. Within the Shoreland Zone adjacent to
tidal areas (Kennebec River) 30,000 150
b. Within the Shoreland Zone adjacent to
non-tidal areas (Togus Stream) 40,000 200
Governmental, Institutional, Commercial or Industrial per principal structure
a. Within the Shoreland Zone adjacent to tidal
areas exclusive of those areas zoned for
Commercial Fisheries and Maritime
Activities 40,000 200
b. Within the Shoreland Zone adjacent to tidal
areas zoned for Commercial Fisheries and
Maritime Activities NONE NONE
c. Within the Shoreland Zone adjacent to
non-tidal areas 60,000 300
Public and Private Recreational Facilities
a. Within the Shoreland Zone adjacent to
tidal and non-tidal areas 40,000 200
2. Land below the normal high-water line of a water body and land beneath roads
serving more then two (2) lots shall not be included toward calculating minimum lot
area.
3. Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of the
land on both sides thereof after September 22, 1971.
16
4. The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high-water line of a water body shall be equal to or
greater than the shore frontage requirement for a lot with the proposed use.
5. If more than one residential dwelling unit or more than one principal commercial or
industrial structure is constructed on a single parcel, all dimensional requirements shall
be met for each additional dwelling unit or principal structure
B. Principal and Accessory Structures
1. All new principal and accessory structures shall be set back at least seventy-five (75)
feet from the normal high-water line of water bodies, or tributary streams, except that
in the General Development District the setback from the normal high-water line shall
be at least twenty-five (25) feet, and in the Commercial Fisheries/Maritime Activities
District there shall be no minimum setback.
In addition:
a. The water body setback provision shall neither apply to structures which
require direct access to the water to the water as an operational necessity, such
as piers, docks and retaining walls, nor to other functionally water-dependent
uses.
b. If the average slope from the setbacks defined above to the normal high-
water line exceed twenty (20) percent, the Planning Board is authorized to
increase the setback from the normal high-water line to up to one hundred and
twenty-five (125) feet, as a condition of permit approval.
2. Principal or accessory structures and expansions of existing structures which are
permitted any Districts, shall not exceed thirty-five (35) feet in height. This provision
shall not apply to structures such as transmission towers, windmills, antennas, and
similar structures having floor area.
3. All buildings and structures, including basements, proposed to be located within the
area of the 100 year flood designated on the Federal Emergency Management Agency's
(FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps must meet the
design criteria and are subject to the regulations of the FLOODPLAIN MANAGEMENT
ORDINANCE #41487-3 FOR THE TOWN OF RANDOLPH, as enacted April 14, 1987.
Separate applications and permits are required under both ordinances.
4. The total area of all structures, parking lots and other non-vegetated surfaces, within
the shoreland zone shall not exceed twenty (20) percent of the lot or a portion there of,
located within the shoreland zone, including land area previously developed, except in
the General Development District and in the Commercial Fisheries/Maritime Activities
District, where lot coverage shall not exceed seventy (70) percent.
17
5. Notwithstanding the requirements stated above, stairways or similar structures may
be allowed with a permit from the Code Enforcement Officer, to provide shoreline
access in areas of steep slopes or unstable soils provided; that the structure is limited to
a maximum of four (4) feet in width; that the structure does not extend below or over
the normal high-water line of a water body (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, Title 38,
Section 480-C); and that the applicant demonstrates that no reasonable access
alternative exists on the property.
C. Piers, Docks, Wharfs, Bridges and Other Structures and Uses Extending Over or Beyond the
Normal High-Water Line of a Water Body
1. Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
2. The location shall not interfere with existing developed or natural beach areas.
3. The facility shall be located so as to minimize adverse effects on fisheries.
4. The facility shall be no larger in dimension than necessary to carry on the activity and
be consistent with existing conditions, use, and character of the area.
5. No new structure shall be built on, over or abutting a pier, wharf, dock or other
structures extending beyond the normal high-water line of a water body unless the
structure requires direct access to the water as an operational necessity.
6. No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water line of a water body shall be converted to
residential dwelling units in any district.
7. Except in the General Development District and Commercial Fisheries/Maritime
Activities District, structures built on, over or abutting a pier, wharf, dock or other
structure extending beyond the normal high-water line of a water body shall not exceed
twenty (20) feet in height above the pier, wharf, dock or other structure.
NOTE: Permanent structures projecting into or over water bodies shall require a permit from
the Department of Environmental Protection pursuant to the Natural Resources
Protection Act, Title 38 M.R.S.A., Section 480-C.
D. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
Procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land,
not including roads and driveways, for each site. Land supporting wetland vegetation,
18
and land below the normal high-water line of a water body shall not be included in
calculating land area per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility
and service buildings shall be set back a minimum of one hundred (100) feet from the
normal high-water line of the Kennebec River and seventy-five (75) feet from the
normal high-water line of other water bodies, or tributary streams.
E. Individual Private Campsites
Individual, private campsites not associated with campgrounds are permitted provided the
following conditions are met:
1. One campsite per lot existing on June 26, 1991, or thirty thousand (30,000) square
feet of lot area within the shoreland zone, whichever is less, may be permitted.
2. Campsite placement on any lot, including the area intended for a recreational vehicle
or tent platform, shall be set back one hundred (100) feet from the normal high-water
line of the Kennebec River and seventy-five (75) feet from the normal high-water line of
other water bodies or tributary streams.
3. Recreational vehicles shall not be located on any type of permanent foundation
except for a gravel pad, and no structure(s) except canopies shall be attached to the
recreational vehicle.
4. The clearing of vegetation for the sitting of the recreational vehicle, tent or similar
shelter in a Resource Protection District shall be limited to one thousand (1000) square
feet.
5. A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by the Local
Plumbing Inspector. Where disposal is off-site, written authorization from the receiving
facility or land owner is required.
6. When a recreational vehicle, tent or similar shelter is placed on-site for more then
one hundred and twenty (120) days per year, all requirements for residential structures
shall be met, including the installation of a subsurface sewage disposal system in
compliance with the State of Maine Subsurface Wastewater Disposal Rules unless
served by public sewage facilities.
F. Commercial and Industrial Uses
The following new commercial and industrial uses are prohibited within all shoreland zones,
except the General Development District, where such uses may be allowed by the Planning
Board, as long as they are compatible with abutting property uses:
19
a. Auto washing facilities
b. Auto or other vehicle services and/or repair operations, including body shops
c. Chemical and bacteriological laboratories
d. Storage of chemicals, including herbicides, pesticides or fertilizers other than
amounts normally associated with individual households or farms
e. Commercial painting, wood preserving, and furniture stripping
f. Dry cleaning establishments
g. Electronic circuit assembly
h. Laundromat, unless connected to a sanitary sewer
i. Metal plating, finishing, or polishing
j. Petroleum or petroleum product storage and/or sale except storage on the
same property as use occurs and except for storage and sales associated with
marinas
k. Photographic processing
l. Printing
G. Parking Areas
1. Parking areas shall meet the shoreline setback requirements for structures for the
district in which such areas are located, except that in the General Development and
Commercial Fisheries/Maritime Activities District parking areas shall be set back at
least twenty- five (25) feet from the normal high-water line. The setback requirement
for parking areas serving public boat launching facilities, in Districts other than the
General Development and Commercial Fisheries/Maritime Activities Districts may be
reduced to no less than fifty (50) feet from the normal high-water line, if the Planning
Board finds that no other reasonable alternative exists.
2. Parking areas shall be adequately sized for the proposed use and shall be designed
to prevent storm water run-off from flowing directly into a water body, and where
feasible, to retain all run-off on-site.
3. In determining the appropriate size of proposed parking facilities, the following shall
apply:
a. Typical parking space: Approximately ten (10) feet wide and twenty (20) feet
long, except that parking spaces for a vehicle and boat trailer shall be forty
(40) feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways
The following standards shall apply to the construction of the roads and/or driveways and
drainage systems, culverts and other related features.
1. Roads and driveways shall be set back at least seventy-five (75) feet from the
20
normal high-water line of all water bodies or tributary streams, unless no reasonable
alternative exists as determined by the Planning Board. If no other reasonable
alternative exists, the Planning Board may reduce the road and/or driveway setback
requirement to no less than fifty (50) feet upon clear showing by the applicant that
appropriate techniques will be used to prevent sedimentation of the water body.
Such techniques may include, but are not limited to, the installation of settling basins,
and/or the effective use of additional ditch relief culverts and turnouts placed so as to
avoid sedimentation of water body or tributary stream.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall
be increased by ten (10) feet for each five (5) percent increase in slope above twenty
(20) percent.
This paragraph shall neither apply to approaches to water crossings nor to roads or
driveways that provide access to permitted structures, and facilities located nearer to
the shoreline due to an operational necessity.
2. Existing public roads may be expanded within the legal road right-of-way
regardless of its setback from a water body.
3. New roads and driveways are prohibited in a Resource Protection District except
to provide access to permitted uses within the district, or as approved by the
Planning Board upon a finding that no reasonable alternative route or location is
available outside the district, in which case the road and/or driveway shall be set back
as far as practicable from the normal high-water line of a water body or, tributary
stream.
4. Road banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for
erosion and sedimentation control contained in subsection Q.
5. Road grades shall be no greater than ten (10) percent except for short segments of
less than two hundred (200) feet.
6. In order to prevent road service drainage from directly entering water bodies,
roads shall be designed, constructed, and maintained to empty onto an unscarified
buffer strip at least fifty (50) feet plus two times the average slope, in width between
the outflow point of the ditch or culvert and the normal high-water line of a water
body, tributary stream, or upland edge of a wetland. Road surface drainage which is
directed to an unscarified buffer strip shall be diffused or spread out to promote
infiltration of the run-off and to minimize channelized flow of the drainage through
the buffer strip.
7. Ditch relief (cross damage) culverts, drainage dips and water turnouts shall be
Installed in a manner effective in directing drainage onto unscarified buffer strips
before the flow in the road or ditches gains sufficient volume or head to erode the
21
road or ditch. To accomplish this, the following shall apply:
a. Ditch relief culverts, drainage dips and associated water turnouts shall be
spaced along the road at intervals no greater than indicated in the following
table:
Road Grade
Spacing
(Percent) (Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
b. Drainage dips may be used in place of ditch relief culverts only where the
road grade is ten (10) percent or less.
c. On road sections having slopes greater than ten (10) percent, ditch relief
culverts shall be placed across the road at approximately a thirty (30) degree
angle downslope from a line perpendicular to the centerline of the road.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order
to allow for effective functioning, and their inlet and outlet ends shall be
stabilized with appropriate materials.
8. Ditches, culverts, bridges, dips, water turnouts and other storm water run-off
control installations associated with roads shall be maintained on a regular basis
to assure effective functioning.
I. Signs
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Limited Residential and Limited Commercial Districts:
1. Signs and billboards relating to goods and services sold on the premises shall be
permitted, provided that such signs shall not exceed six (6) square feet in area and
shall not exceed two (2) signs per premises. Billboards and signs relating to goods
or services not sold or rendered on the premises shall be prohibited.
2. Name signs shall be permitted, provided such signs shall not exceed two (2) signs
per premises.
3. Residential users may display a single sign not over three (3) square feet in area
relating to the sale, rental, or lease of the premises.
22
4. Signs relating to trespassing and hunting shall be permitted without restriction as
to number provided that no such sign shall exceed two (2) square feet in area.
5. Signs relating to public safety shall be permitted without restriction.
6. No sign shall extend higher than twenty (20) feet above the ground.
7. Signs may be illuminated only by shielded, non-slashing lights.
J. Storm Water Run-Off
1. All new construction and development shall be designed to minimize storm water
run-off from the site in excess of the natural predevelopment conditions. Where
possible, existing natural run-off control features, such as berms, swales, terraces
and wooded areas shall be retained in order to reduce run-off and encourage
infiltration of stormwaters.
2. Storm water run-off control systems shall be maintained as necessary to ensure
proper functioning.
K. Septic Waste Disposal
1. All subsurface sewage disposal systems shall be installed in conformance with the
State of Maine Subsurface Wastewater Disposal Rules.
NOTE: The Rules, among other requirements, include:
a. The minimum setback for new subsurface sewage disposal systems, shall be
no less than one hundred (100) horizontal feet from the normal high-water
line of a perennial water body. The minimum setback distances from water
bodies for new subsurface sewage disposal systems shall not be reduced by
variance.
b. Replacement systems shall meet the standards for replacement systems as
contained in the Rules.
L. Essential Services
1. Where feasible, the installation of essential services shall be limited to existing
public ways and existing service corridors.
2. The installation of essential services is not permitted in a Resource Protection or
Stream Protection District, except to provide services to a permitted use within said
district, or except where the applicant demonstrates that no reasonable alternative
exists. Where permitted, such structures and facilities shall be located so as to
minimize any adverse impacts on surrounding uses and resources, including visual
23
impacts.
M. Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from
the Code Enforcement Officer shall be required for mineral exploration which exceeds the
above limitation. All excavations, including test pits and holes shall be immediately capped,
filled or secured by other equally effective measures, so as to restore disturbed areas and
to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
1. A reclamation plan shall be filled with, and approved by the Planning Board
before a permit is granted. Such plan shall describe in detail procedures to be
undertaken to fulfill the requirements of paragraph 4 below.
2. Unless authorized pursuant to the Natural Resources Protection Act, Title 38,
M.S.R.A., Section 480-C no part of any extraction operation, including drainage and
run-off control features shall be permitted within seventy-five (75) feet of the
normal high-water line of any water body or tributary stream. Extraction operations
shall not be permitted within seventy-five (75) feet of any property line, without
written permission of the owner of such adjacent property.
3. Within twelve (12) months following the completion of extraction operations at
any extraction site, which operations shall be deemed complete when less than one
hundred (100) cubic yards of materials are removed in any consecutive twelve (12)
month period, ground levels and grades shall be established in accordance with the
following:
a. All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated
onsite may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, Title 38, Maine Revised Statutes Annotated,
Section 1310 and Chapter 404 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such materials.
b. The final graded slope shall be two to one (2:1) slope or flatter.
c. Top soil or loam shall be retained to cover all disturbed land areas, which shall
be reseeded and stabilized with vegetation native to the area. Additional
topsoil or loam shall be obtained from off-site sources if necessary to
complete the stabilization project.
24
4. In keeping with the purposes of this Ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated with
mineral extraction operations on surrounding uses and resources.
N. Agriculture
1. All spreading or disposal of manure shall be accomplished in conformance with
the Maine Guidelines for Manure and Manure Sludge Disposal on Land published by
the University of Maine Soil and Water Conservation Commission in July, 1972.
2. Manure shall not be stored or stockpiled within seventy-five (75) feet horizontal
distance, of any water bodies or tributary streams. Within five (5) years of June 26,
1991 all manure storage areas within the shoreland zone must be constructed or
modified such that the facility produces no discharge of effluent or contaminated
storm water. Existing facilities which do not meet the setback requirement may
remain, but must meet the no discharge provision within the above five (5) year
period.
3. Agriculture activities involving tillage of soil greater than forty thousand (40,000)
square feet in surface area, or the spreading, disposal or storage of manure within
the shoreland zone shall require a Soil and Water Conservation Plan to be filed with
the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
NOTE: Assistance in preparing a soil and water conservation plan may be available through the
Local Soil and Water Conservation District office.
4. There shall be no new tilling of soil within seventy-five (75) feet, horizontal
distance, from any water bodies; nor within twenty-five (25) feet, horizontal
distance, of tributary streams. Operations in existence on June 26, 1991 and not in
conformance with this provision may be maintained.
5. After June 26, 1991, newly established livestock grazing areas shall not be
permitted within seventy-five (75) feet, horizontal distance of any water bodies; nor
within twenty-five (25) feet, horizontal distance, of tributary streams. Livestock
grazing associated with ongoing farm activities, and which are not in conformance
with the above setback provisions may continue, provided that such grazing is
conducted in accordance with a Soil and Water Conservation Plan.
O. Timber Harvesting
1. Within the strip of land extending 75 feet inland from the normal high-water line
in a shoreland area zoned for resource protection there shall be no timber
harvesting, except to remove safety hazards.
2. Except in areas as described in Paragraph 1 above, timber harvesting shall
25
conform with the following provisions:
a. Selective cutting of no more than forty (40) percent of the total volume of
trees four (4) inches or more in diameter measured at 4 ½ feet above ground
level on any lot in any ten (10) year period is permitted. In addition:
i. Within seventy-five (75) feet, horizontal distance, of the normal high-water
line of any water bodies or tributary streams, there shall be no clear-cut
openings and a well-distributed stand of trees and other vegetation,
including existing ground cover, shall be maintained.
ii. At distances greater than seventy-five (75) feet, horizontal distance, of the
normal high-water line of any water bodies; harvesting operations shall
not create single clear-cut openings greater than ten-thousand (10,000)
square feet in the forest canopy. Where such openings exceed five-
thousand (5,000) square feet they shall be at least one hundred (100) feet
apart. Such clear-cut openings shall be included in the calculation of total
volume removal. For the purposes of these standards volume may be
considered to be equivalent to basal area.
b. No accumulation of slash shall be left within fifty (50) feet of the normal
high-water line of a water body. In all other areas slash shall either be
removed or disposed of in such a manner that it lies on the ground and no
part thereof extends more than four (4) feet above the ground. Any debris
that falls below the normal high-water line of a water body shall be removed.
c. Timber harvesting equipment shall not use stream channels as travel routes
except when:
i. Surface waters are frozen; and
ii. The activity will not result in any ground disturbance.
d. All crossings of flowing water shall require a bridge or culvert, except in areas
with low banks and channel beds which are composed of gravel, rock or
similar hard surface which would not be eroded or otherwise damaged.
e. Skid trail approaches to water crossings shall be located and designed so as to
prevent water run-off from directly entering the water body or tributary
stream. Upon completion of timber harvesting, temporary bridges and
culverts shall be removed and areas of exposed soil revegetated.
f. Except for water crossings, skid trails and other sites where the operation of
machinery used in timber harvesting results in the exposure of mineral soil
shall be located such that an unscarified strip of vegetation of at least seventy-
five (75) feet in width for slopes up to ten (10) percent shall be retained
26
between the exposed mineral soil and the normal high-water line of a water
body. For each ten (10) percent increase in slope, the unscarified strip shall be
increased by twenty (20) feet. The provisions of this paragraph apply only to a
face sloping toward the water body or wetland, provided, however, that no
portion of such exposed mineral soil on a back face shall be closer than twenty
five (25) feet from the normal high-water line of a water body or upland edge
of a wetland.
P. Clearing of Vegetation for Development
1. Within a shoreland area zoned for Resource Protection, there shall be no
cutting of vegetation within the strip of land extending 75 feet, horizontal distance,
inland from the normal high-water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the clearing of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
2. Except in areas as described in Paragraph 1, above, and except to allow for the
development of permitted uses, within a strip of land extending seventy-five (75)
feet, horizontal distance, from any water body or tributary stream, a buffer strip of
vegetation shall be preserved as follows:
a. There shall be no cleared opening greater than two hundred fifty (250) square
feet in the forest canopy as measured from the outer limits of the tree crown.
However, a footpath not to exceed ten (10) feet in width as measured
between tree trunks is permitted provided that a cleared line of sight to the
water through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is permitted provided that a
well distributed stand of trees and other vegetation is maintained. For the
purposes of this section a "well-distributed stand of trees and other
vegetation" adjacent to any water bodies or tributary streams shall be
defined as maintaining a rating score of 8 or more in any 25-foot by 25-foot
square (625 square feet) area as determined by the following rating system.
Diameter of Tree at 4 ½ feet Above Ground Level (inches) Points
2 - 4 in. 1
>4 - 12 in. 2
>12 in. 4
NOTE: As an example, if a 25-foot X 25-foot plot contains three (3) trees between 2 and 4
inches in diameter, and three trees over 12 inches in diameter, the rating score is:
(3x1) + (3x2) + (3x4) = 21 points
27
Thus, the 25-foot by 25-foot plot contains trees worth 21 points. Trees totaling 13
points (21 - 8 = 13) may be removed from the plot provided that no cleared openings
are created.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4½ feet above ground level may be
removed in any ten (10) year period.
c. Pruning of tree branches, on the bottom 1/3 of the tree is permitted.
d. In order to maintain a buffer strip of vegetation, when the removal of storm-
damaged, diseased, unsafe, or dead trees results in the creation of cleared
openings, these openings shall be replanted with native tree species unless
existing new growth is present.
The provisions contained in paragraph 2 above shall not apply to those portions of
public recreational facilities adjacent to public swimming areas. Cleared areas, however,
shall be limited to the minimum area necessary.
3. At distances greater than seventy-five (75) feet, horizontal distance, from the
normal high-water line of any water body or tributary stream, there shall be
permitted on any lot, in any ten (10) year period, selective cutting of not more
than forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured 4½ feet above ground level. Tree removal in conjunction with the
development of permitted uses shall be included in the forty (40) percent
calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for development, including but not limited to,
principal and accessory structures, driveways and sewage disposal areas, exceed in
the aggregate, 25% of the lot area or ten thousand (10,000) square feet, whichever
is greater, including land previously developed. This provision shall not apply to
the General Development or Commercial Fisheries/Maritime Activities District.
4. Cleared openings legally in existence on June 26, 1991 may be maintained, but
shall not be enlarged, except as permitted by this Ordinance.
5. Fields which have reverted to primarily shrubs, trees, or other woody
vegetation shall be regulated under the provisions of this section.
Q. Erosion and Sedimentation Control
1. All activities which involve filling, grading, excavation or other similar activities
which result in unstabilized soil conditions and which require a permit shall
require a written soil erosion and sedimentation control plan. The plan shall be
submitted to the Planning Board for approval and shall include, where applicable,
28
provisions for:
a. Mulching and revegetation of disturbed soil.
b. Temporary run-off control features such as hay bales, silt fencing or diversion
ditches.
c. Permanent stabilization structures such as retaining walls or riprap.
2. In order to create the least potential for erosion, development shall be
designed to fit with the topography and soils of the site. Areas of steep slopes
where high cuts and fills may be required shall be avoided wherever possible, and
natural contours shall be followed as closely as possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
stages of the activity. The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
4. Any exposed ground area shall be temporarily or permanently stabilized within
one (1) week from the time it was last actively worked, by use of riprap, sod, seed,
and mulch, or other effective measures. In all cases permanent stabilization shall
occur within nine (9) months of the initial date of exposure. In addition:
a. Where mulch is used, it shall be applied at a rate of at least one (1) bale per
five hundred (500) square feet and shall be maintained until a catch of
vegetation is established.
b. Anchoring the mulch with netting, peg and twine or other suitable method
may be required to maintain the mulch cover.
c. Additional measures shall be taken where necessary in order to avoid siltation
into the water. Such measures may include the use of staked hay bales
and/or silt fences.
5. Natural and man-made drainage ways and drainage outlets shall be protected
from erosion from water flowing through them. Drainageways shall be designed
and constructed in order to carry water from a twenty-five (25) year storm or
greater, and shall be stabilized with vegetation or lined with riprap.
R. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without cause adverse environmental impacts, including
severe erosion, mass soil movement, improper drainage, and water pollution, whether
29
during or after construction. Proposed uses requiring subsurface waste disposal, and
commercial or industrial development and other similar intensive land uses, shall require a
soils report based on an onsite investigation and be prepared by state-certified
professionals. Certified persons may include Maine Certified Soil Scientists, Maine
Registered Professional Engineers, Maine State Certified Geologists and other persons who
have training and experience in the recognition and evaluation of soil properties. The report
shall be based upon the analysis of the characteristics of the soil and surrounding land water
areas, maximum ground water elevation, presence of ledge, drainage conditions, and other
pertinent date which the evaluator deems appropriate. The soils report limitations where
they exist.
S. Water Quality
No activity shall deposit on or into the ground or discharge to waters of the State any
pollutant that, by itself or in combination with other activities or substances will impair
designated uses or the water classification of the water body.
T. Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places,
as determined by the Planning Board shall be submitted by the applicant to the Maine
Historic Preservation Commission for review and comment, at least twenty (20) days prior to
action being taken by the Planning Board. The Planning Board shall consider comments
received from the Commission prior to rendering a decision on the application.
Section 16. Administration
A. Administering Bodies and Agents
1. Code Enforcement Officer
A Code Enforcement Officer shall be appointed or reappointed annually by July 1st
2. Board of Appeals
A Board of Appeals shall be created in accordance with the provisions of Title 30-A
Section 2691.
3. Planning Board
A Planning Board shall be created in accordance with the provisions of State law.
B. Permits Required
After June 26, 1991 no person shall, without first obtaining a permit, engage in any
30
activity or use of land or structure requiring a permit, engage in any activity or use of
land or structure requiring a permit in the district in which such activity or use would
occur; or expand, change, or replace an existing use or structure; or renew a
discontinued nonconforming use. ALL WORK in the area of the 100 year flood plain
requires a FLOOD HAZARD DEVELOPMENT PERMIT in addition to permits required
under this ordinance. BEFORE STARTING ANY PROJECT in the shoreland zone you
should check with other agencies, such as the Department of Environmental
Protection and the Army Corps of Engineers to see if they also require permits for
the proposed work.
C. Permit Application
1. Every applicant for a permit shall submit a written application, on a form provided
by the municipality, to the appropriate official as indicated in Section 14. The
application must include a scaled site plan.
2. All applications shall be signed by the owner or owners of the property or other
person authorizing the work, certifying that the information in the application is
complete and correct. If the person signing the application is not the owner or
lessee of the property then that person shall submit a letter of authorization from
the owner or lessee.
3. All applications shall be dated, and the Code Enforcement Officer or Planning
Board, as appropriate, shall note upon each application the date and time of its
Receipt.
4. If the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation
approved by the Plumbing Inspector, shall be submitted whenever the nature of
the proposed structure would require the installation of a subsurface sewage
disposal system.
D. Procedure for Administering Permits
Within 35 days of the date of receiving a written application, the Planning Board or
Code Enforcement Officer, as indicated in Section 14, shall notify the applicant in
writing either that the application is a complete application, or, if the application is
incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall
approve, approve with conditions, or deny all permit applications in writing within 35
days of receiving a completed application. However, if the Planning Board has a
waiting list of applications, a decision on the application shall occur within 35 days
after the first available date on the Planning Board's agenda following receipt of the
completed application, or within 35 days of the public hearing, if one is held. Permits
shall be approved if the proposed use or structure is found to be in conformance with
the purposes and provisions of this Ordinance.
31
The applicant shall have the burden of proving that the proposed land use activity is
in conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board or Code
Enforcement Officer, (as called for in Section 14), the Board or Code Enforcement
Officer shall approve an application or approve it with conditions if the Board or
Code Enforcement Officer makes a positive finding based on the information
presented that the proposed use:
1. Will maintain safe and healthful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface
waters;
3. Will adequately provide for the disposal of all wastewater;
4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird
or other wildlife habitat;
5. Will conserve shore cover and visual, as well as actual, points of access to
Inland and coastal waters;
6. Will protect archaeological and historic resources as designated in the
comprehensive plan;
7. Will not adversely affect existing commercial fishing or maritime activities in a
Commercial Fisheries/Maritime Activities District;
8. Will avoid problems associated with flood plain development and use; and
9. Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as
conditions shall be stated in writing. No approval shall be granted for an application
involving a structure if the structure would be located in an unapproved subdivision or
would violate any other local ordinance or regulation or any State law which the
municipality is responsible for enforcing.
E. Expiration of Permit
Following the issuance of a permit, if no substantial start is made in construction or in
the use of the property within one year of the date of the permit, the permit shall
lapse and become void.
F. Installation of Public Utility Service
No public utility, water district, sanitary district or any utility company of any kind
may install services to any new structure located in the shoreland zone unless written
authorization attesting to the validity and currency of all local permits required under
this or any previous Ordinance, has been issued by the appropriate town officials.
Following installation of service, the company or district shall forward the written
authorization to the town officials, indicating that installation has been completed.
32
G. Appeals
1. Powers and Duties of the Board of Appeals
The Board of Appeals shall have the following powers:
a. Enforcement Decisions: Enforcement decisions made by town officials may
NOT be taken to the Board of Appeals.
b. Variance Appeals: To authorize variances upon appeal, within the
limitations set forth in this Ordinance.
2. Variance Appeals
Variances may be permitted only under the following conditions:
a. Variances may be granted only from dimensional requirements including
but not limited to, lot width, structure height, percent of lot coverage, and
setback requirements.
b. Variances shall not be granted for establishment of any uses otherwise
prohibited by this Ordinance.
c. The Board shall not grant a variance unless it finds that:
(1) The proposed structure or use would meet the provisions of Section 15
except for the specific provisions which has created the non-conformity
and from which relief is sought; and
(2) The strict application of the terms of this Ordinance would result in
undue hardship.
The term "undue hardship" shall mean:
i. That the land in question cannot yield a reasonable return unless a
variance is granted;
ii. That the need for a variance is due to the unique circumstances of the
property and not to the general conditions in the neighborhood;
iii. That the granting of a variance will not alter the essential character of
the locality; and
iv. That the hardship is not the result of action taken by the applicant or a
prior owner.
33
d. The Board of Appeals shall limit any variances granted as strictly as possible
in order to insure conformance with the purposes and provisions of this
Ordinance to the greatest extent possible, and in doing so may impose such
conditions to a variance as it deems necessary. The party receiving the
variance shall comply with any conditions imposed.
e. A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the town
officials to the Commissioner of the Department of Environmental
Protection at least twenty (20) days prior to action by the Board of Appeals.
Any comments received from the Commissioner prior to action by the Board
of Appeals shall be made part of the record and shall be taken into
consideration by the Board of Appeals.
f. A copy of all variances granted by the Board of Appeals shall be submitted to
the Department of Environmental Protection within fourteen (14) days of the
decision.
3. Appeal Procedure
a. Making an Appeal
(1) An administrative or variance appeal may be taken to the Board of
Appeals by an aggrieved party from any decision of the Code
Enforcement Officer or the Planning Board. Such appeal shall be taken
within thirty (30) days of the date of the decision appealed from, and not
otherwise, except that the Board, upon a showing of good cause, may
waive the thirty (30) day requirement.
(2) Such appeal shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
i. A concise written statement indicating what relief is requested and
why it should be granted.
ii. A sketch drawn to scale showing lot lines, location of existing buildings
and structures and other physical features of the lot pertinent to the
relief sought.
(3) Upon being notified of an appeal, the Code Enforcement Officer of
Planning Board, as appropriate, shall transmit to the Board of Appeals all
of the papers constituting the record of the decision appealed from.
(4) The Board of Appeals shall hold a public hearing on the appeal within
thirty-five (35) days of its receipt of an appeal request.
34
b. Decision by Board of Appeals
(1) A majority of the board shall constitute a quorum for the purpose of
deciding an appeal. A member who abstains shall not be counted in
determining whether a quorum exists.
(2) The concurring vote of a majority of the members of the Board of
Appeals present and voting shall be necessary to reverse an order,
requirement, decision, or determination of the Code Enforcement
Officer or Planning Board, or to decide in favor of the applicant on any
matter on which it is required to decide under this Ordinance, or to
affect any variation in the application of this Ordinance from its stated
terms. The board may reverse the decision, or failure to act, of the
Code Enforcement Officer or Planning Board only upon a finding that
the decision, or failure to act, was clearly contrary to specific provisions
of this Ordinance.
(3) The person filing the appeal shall have the burden of proof.
(4) The Board shall decide all appeals within thirty-five (35) days after the
close of the hearing, and shall issue a written decision on all appeals.
(5) All decisions shall become a part of the record and shall include a
statement of findings and conclusions as well as the reasons or basis
therefor, and the appropriate order, relief or denial thereof.
4. Appeal to Superior Court
Any aggrieved party who participated as a party during the proceedings before the
Board of Appeals may take an appeal to Superior Court in accordance with State laws
within thirty (30) days from the date of any decision of the Board of Appeals.
5. Reconsideration
The Board of Appeals may reconsider any decision within thirty (30) days of its prior
decision. The board may conduct additional hearings and receive additional
evidence and testimony.
H. Enforcement
1. Nuisances
Any violation of this Ordinance shall be deemed to be a nuisance.
2. Code Enforcement Officer
35
a. It shall be the duty of the Code Enforcement Officer to enforce the provisions of
this Ordinance. If the Code Enforcement Officer shall find that any provision of
this Ordinance is being violated, he or she shall notify in writing the person
responsible for such violation, indicating the nature of the violation and ordering
the action necessary to correct it, including discontinuance of illegal use of land,
buildings or structures, or work being done, removal of illegal buildings or
structures, and abatement of nuisance conditions. A copy of such notices shall
be submitted to the town officers and be maintained as a permanent record.
b. The Code Enforcement Officer shall conduct onsite inspections to insure
compliance with all applicable laws and conditions attached to permit approvals.
The Code Enforcement Officer shall also investigate all complaints of alleged
Violations of this Ordinance.
c. The Code Enforcement Officer shall keep a complete record of all essential
transactions of the office, including applications submitted, permits granted or
denied, variances granted or denied, revocation actions, revocation of permits,
appeals, court actions, violations investigated, violations found, and fees
collected. On an annual basis, a summary of this record shall be submitted to
the Director of the Bureau of Land Quality Control within the Department of
Environmental Protection.
3. Legal Actions
When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Board of Selectman, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and
proceedings, either legal or equitable, including seeking injunctions of violations
and the imposition of fines, that may be appropriated or necessary to enforce the
provisions of this Ordinance in the name of the municipality. The Board of
Selectman, or their authorized agent, are hereby authorized to enter into
administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not
allow an illegal structure or use to continue unless there is clear and convincing
evidence that the illegal structure or use was constructed or conducted as a direct
result of erroneous advice given by an authorized town official and there is no
evidence that the owner acted in bad faith, or unless the removal of the structure
or use will result in a threat or hazard to public health and safety or will result in
substantial environmental damage.
4. Fines
Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who orders or conducts any activity in violation of this Ordinance shall
be penalized in accordance with Title 30-A, Maine Revised Statutes Annotated,
Subsection 4506.
36
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation
for each day that the violation continues.
Section 17. Definitions
Accessory structure or use - A use or structure which is incidental and subordinate to
the principal use or structure. Accessory uses, when aggregated shall not subordinate
the principal use of that lot. A deck or similar extension of the principal structure or a
garage attached to the principal structure by a roof or a common wall is considered part
of the principal structure.
Agriculture - The production, keeping or maintenance for sale or lease, of plants and/or
animals, including but not limited to: forages and sod crops; grains and seed crops; dairy
animals and dairy products; poultry and poultry products; livestock; fruits and
vegetables; and ornamental and green house products. Agriculture does not include
forest management and timber harvesting activities.
Aggrieved party - An owner of land whose property is directly or indirectly affected by
the granting or denial of a permit or variance under this Ordinance; a person whose land
abuts land for which a permit or variance has been granted; or any other person or
group of persons who have suffered particularized injury as a result of the granting or
denial of such permit or variance.
Aquaculture - The growing or propagation of harvestable freshwater, estuarine, or
marine plant or animal species.
Boat Launching Facility - A facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for
vehicles and trailers.
Campground - Any area or tract of land to accommodate two (2) or more parties in
temporary living quarters, including, but not limited to tents, recreational vehicles or
other shelters.
Coastal Wetland - All tidal and subtidal lands; all lands below any definable debris line
left by tidal action; all lands with vegetation present that is tolerant of salt water and
occurs primarily in a salt water or estuarine habitat; and any swamp, marsh bog, beach,
flat or other contiguous low land which is subject to tidal action during that maximum
spring tide level as identified in tide tables published by the National Ocean Service.
Coastal wetlands may include portions of coastal sand dunes.
Commercial Use - The use of lands, buildings, or structures, other than a "home
occupation," defined below, the intent and result of which activity is the production of
income from the buying and selling of goods and/or services, exclusive of rental of
residential buildings and/or dwelling units.
37
Dimensional Requirements - Numerical standards relating to spatial relationships
including but not limited to setback, lot area, shore frontage and height.
Driveway - A vehicular access-way less than five hundred (500) feet in length serving
two lots or less.
Emergency Operations - Operations conducted for the public health, safety or general
welfare, such as protection of resources from immediate destruction or loss, law
enforcement, and operations to recue human beings, property and livestock from the
threat of destruction or injury.
Essential Services - The construction, alteration or maintenance of gas, electrical or
communication facilities; steam, fuel, electric power or water transmission or
distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; town sewage lines,
collection or supply systems; and associated storage tanks. Such systems may include
towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call
boxes, traffic signals, hydrants and similar accessories, but shall not include service
drops or buildings which are necessary for the furnishing of such services.
Expansion of a Structure - An increase in the floor area or volume of a structure,
including all extensions such as, but not limited to attached: decks, garages, porches and
greenhouses.
Expansion of Use - The addition of weeks or months to a use's operating season;
additional hours of operation; or the use of more floor area or ground area devoted to
a particular use.
Family - One or more persons occupying a premises and living as a single housekeeping
unit.
Floor Area - The sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls, plus the horizontal area of any unenclosed portions of a structure such as
porches and decks.
Forest Management Activities - Timber cruising and other forest resource evaluation
activities, pesticide or fertilizer application, management planning activities, timber
stand improvement, pruning, regeneration of forest stands, and other similar or
associated activities, exclusive of timber harvesting and the construction, creation or
maintenance of roads.
Foundation - The supporting substructure of a building or other structure including but
not limited to basements, slabs, sills, posts or frost walls.
Functionally Water-Dependent Uses - Those uses that require, for their primary
purpose, location on submerged lands or that require direct access to, or location in,
38
coastal and inland waters and which cannot be located way from these waters. The
uses include, but are limited to commercial and recreational fishing and boating
facilities, waterfront dock and port facilities, shipyards and boat building facilities,
marinas, navigation aides, basins and channels, and which cannot reasonably be located
or operated at an inland site, and uses which primarily provide general public access to
marine or tidal waters. In addition accessory uses, complimenting the functionally
water-dependent use, may be allowed with Planning Board approval, such as a
restaurant or snack bar as part of a marina, a picnic area, etc.
Height of a Structure - The vertical distance between the mean original grade at the
downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances which have no floor area.
Home Occupation - An occupation or profession which is customarily conducted on or
in a residential structure or property and which is, 1.) clearly incidental to and
compatible with the residential use of the property and surrounding residential uses;
and 2.) which employs no more than two (2) persons other than family members
residing in the home.
Individual Private Campsite - An area of land which is not associated with a
campground, but which is developed for repeating camping by only one group not to
exceed ten (10) individuals and which involves site improvements which may include but
not be limited to gravel pads, parking areas, fire places, or tent platforms.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or
processing of goods, or the extraction of minerals.
Lot Area - The area of land enclosed within the boundary lines of a lot, minus land
below the normal high-water line of a water body or upland edge of a wetland and areas
beneath roads serving more than two (2) lots.
Marina - A business establishment having frontage on navigable water and, as its
principal use, providing for hire offshore moorings or docking facilities for boats, and
which may also provide accessory services such as boat and related sales, boat repair
and constructions, indoor and outdoor storage of boats and marine equipment, boat
and tackle shops and marine fuel service facilities.
Market Value - The estimated price a property will bring in the open market and under
prevailing market conditions in a sale between a willing seller and a willing buyer, both
conversant with the property and with prevailing general price levels.
Minimum Lot Width - The closest distance between the side lot lines of a lot.
Mineral Exploration - hand sampling, test boring, or other methods of determining the
nature or extent of mineral resources which create minimal disturbance to the land and
which include reasonable measures to restore the land to its original condition.
39
Mineral Extraction - Any operation within any twelve (12) month period which removes
more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock,
peat, or other like material from its natural location and to transport the product
removed, away from the extraction site.
Multi-Unit Residential - A residential structure containing three (3) or more residential
dwelling units.
Non-Conforming Lot - a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements
of the district in which it is located.
Non-Conforming Structure - a structure which does not meet any one or more of the
following dimensional requirements; setback, height, or lot coverage, but which is
allowed solely because it was in lawful existence at the time this Ordinance or
subsequent amendments took effect.
Non-Conforming Use - Use of buildings, structures, premises, land or parts thereof
which is not permitted in the district which it is situated, but which is allowed to remain
solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect. Increase in the nonconformity of the structure - end result
* when a structure is added to or expanded within an existing nonconforming setback
distance which said addition or expansion results in a physical reduction in the
nonconforming setback distance.
*ZONING CHANGES ENACTED BY SPECIAL TOWN MEETING ON 5/17/05
40
THIS PAGE
INTENTIONALLY LEFT
BLANK
41
Normal High-Water Line - That line which is apparent from visible markings, changes in
the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land.
In the case of wetlands adjacent to rivers and great ponds, the normal high-water line is
the upland edge of the wetland, and not the edge of the open water.
Person - An Individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or
other legal entity.
Piers, docks, wharfs, bridges and other structures and uses extending over or beyond
The normal high-water line or within a wetland -
Temporary: Structures which remain in or over the water for less than seven (7)
months in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months
or more in any period of twelve (12) consecutive months.
Principal Structure - A building other than one which is used for purposes wholly
incidental or accessory to the use of another building or use on the same premises.
Principal Use - a use other than one which is wholly incidental or accessory to another
use on the same premises.
Public Facility - Any facility, including, but not limited to, buildings, property, recreation
areas, and roads, which are owned, leased, or otherwise operated, or funded by a
governmental body or public entity.
Recreational Facility - A place designed and equipped for the conduct of sports, leisure
time activities, and other customary and usual recreational activities, excluding boat
launching facilities.
Recreational Vehicle - A vehicle or an attachment to a vehicle designed to be towed,
and designed for temporary sleeping or living quarters for one or more persons, and
which may include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor
home. In order to be considered as a vehicle and not as a structure, the unit must
remain with its tires on the ground, and must be registered with the State Division of
Motor Vehicles.
Replacement System - A system intended to replace: 1.) an existing system which is
either malfunctioning or being upgraded with no significant change of design flow or use
of the structure, or 2.) any existing overboard wastewater discharge.
Residential Dwelling Unit - A room or group of rooms designed and equipped
exclusively for use as permanent, seasonal, or temporary living quarters for only one
42
family. The term shall include mobile homes, but not recreational vehicles.
Riprap - Rocks, irregularly shaped, and at least six (6) inches in diameter, used for
erosion control and soil stabilization, typically used on ground slopes of two (2) units
horizontal to one (1) unit vertical or less.
River - A free-flowing body of water including its associated flood plain wetlands from
that point at which it provides drainage for a watershed of twenty-five (25) square miles
to its mouth.
Road - A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or
other surfacing material constructed for or created by the repeated passage of
motorized vehicles.
Service Drop - Any utility line extension which does not cross or run beneath any
portion of a water body provided that:
1. In the case of electrical service
a. The placement of wires and/or the installation of utility poles is located
entirely upon the premises of the customer requesting service or upon a
roadway right-of-way; and
b. The total length of the extension is less than one thousand (1,000) feet.
2. In the case of telephone service
a. The extension, regardless of length, will be made by the installation of
telephone wires to existing poles, or
b. The extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
Setback - The nearest horizontal distance from the normal high-water line to the
nearest part of a structure, road, parking space or other regulated object or area.
Shore Frontage - The length of a lot bordering on a water body measured in a straight
line between the intersections of the lot lines with the shoreline at normal high-water
elevation.
Shoreland Zone - The land area located within two hundred and fifty (250) feet,
horizontal distance, of the normal high-water line of the Kennebec River and Togus
Stream or within seventy-five (75) feet of the normal high-water line of a Togus Brook.
Significant River Segments - See Title 38 M.R.S.A. Section 437.
43
Stream - Togus Brook from the Chelsea-Randolph Town Line to the Kennebec River.
Structure - Anything built for the support, shelter or enclosure of persons, animals,
goods or property of any kind, together with anything constructed or erected with a
fixed location on or in the ground, exclusive of fences. The term includes structures
temporarily or permanently located, such as decks and satellite dishes.
Substantial Start - Completion of thirty (30) percent of a permitted structure or use
measured as a percentage of estimated total cost.
Subsurface Sewage Disposal System - A collection of treatment tank(s), disposal
area(s), holding tank(s) and pond(s), surface spray system(s), cesspool(s), well(s),
surface ditch(es), alternative toilet(s), or other devices and associated piping designed
to function as a unit for the purpose of disposing of wastes or wastewater on or beneath
the surface of the earth. The term shall not include any wastewater discharge system
licensed under Title 38 M.R.S.A. Section 414, any surface wastewater disposal system
licensed under Title 38 M.R.S.A. Section 413 Subsection 1-A, or any public sewer. The
term shall not include a wastewater disposal system designed to treat wastewater
which is in whole or in part hazardous waste as defined in Title 38 M.R.S.A. Chapter 13,
subchapter 1.
Sustained Slope - A change in elevation where the referenced percent grade is
substantially maintained or exceeded throughout the measured area.
Timber Harvesting - The cutting and removal of trees from their growing site, and the
attendant operation of cutting and skidding machinery but not the construction or
creation of roads. Timber harvesting does not include the clearing of land for approved
construction.
Tributary Stream - A channel between defined banks created by the action of surface
water, whether intermittent or perennial, and which is characterized by the lack of
upland vegetation or presence of aquatic vegetation and by the presence of a bed
devoid of topsoil containing waterborne deposits on exposed soil, parent material or
bedrock, and which flows to a water body or wetland as defined. This definition does
not include the term "stream" as defined elsewhere in this Ordinance, and only applies
to that portion of the tributary stream located within the shoreland zone of the
receiving water body or wetland.
Upland Edge - The boundary between upland and wetland.
Vegetation - all live trees, shrubs, ground cover, and other plants including without
limitation, trees both over and under 4 inches in diameter, measured at 4½ above
ground level.
Volume of a Structure - The volume of all portions of a structure enclosed by roof and
fixed exterior walls as measured from the exterior faces of these walls and roof.
44
Water Body - Any river, stream, or tidal area.
Water Crossing - Any project extending from one bank to the opposite bank of a river
or stream, whether under, through, or over the water course. Such projects include but
may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings.
Wetland - None located in the Town of Randolph per the Department of Environmental
Protection.
Section 18. Shoreland Zoning Districts - Descriptions
NOTE: All districts described below are situated in the Town of Randolph, Kennebec County,
Maine. All references to Rivers, Streams and Brooks refer to the normal highwater line
(as defined in Section 17), unless specifically noted otherwise.
CFMA - Description "A" = Randolph Tax Map No. 2, Lot No. 49B
Description "B" = intentionally left blank
General Development - Description "C" = 250' wide strip of land running southerly
along the Kennebec River from the Chelsea Town Line to a line at right angles to the
easterly line of Route 9, at a point 200' northerly, as measured along the easterly line
of Route 9, of the intersection of the northerly line of Belmont Avenue, excepting all
land situated westerly of the westerly line of Route 9.
General Development - Description "D" = 250' wide strip of land running southerly
along the Kennebec River from the center line of Central Street, projected in a straight
line to the river, to the Pittston Town Line, excepting CFMA - Description "A" and
Resource Protection - Description "J".
Description "E" = Intentionally left blank.
Limited Commercial - Description "F" = 250' wide strip of land running southerly along
the Kennebec River from the southerly line of General Development - Description "C" to
the northerly line of General Development - Description "D".
Limited Residential - Description "G" = 250' wide strip of land running northeasterly
along Togus Stream from the northeasterly limits of General Development - Description
"D", to the northerly line of land shown on Randolph Tax Map No. 1 as Lot No. 39,
extended in a straight line to the Stream.
Limited Residential - Description "H" = 150' wide strip of land running easterly,
northeasterly and northerly along Resource Protection - Description "I" from a drainage
run located about 300' westerly of a small island in Togus Stream (as shown on the
Official Shoreland Zoning Map), to the Chelsea Town Line.
45
Resource Protection - Description "I" = 250' wide strip of land running northeasterly
southeasterly, easterly and northeasterly along Togus Stream from the northerly limits
of Limited Residential- Description "G" to the westerly limits of Limited Residential-
Description "H" and continuing on a 100' wide strip of land lying between Togus Stream
and Limited Residential - Description "H" and running easterly, northeasterly and
northerly along Togus Stream to the Chelsea Town Line.
Resource Protection - Description "J" = All land lying westerly of the westerly line of
Route 27 to the Kennebec River, running southerly from Togus Brook to the southerly
line of land shown on Randolph Tax Map No. 1, as Lot No. 5.
Resource Protection- Description "K" = All land lying westerly of the westerly line of
Route 9 to the Kennebec River, running southerly from the Chelsea Town Line to a line
at right angles to the easterly line of Route 9, at a point 200' northerly, as measured
along the easterly line of Route 9, of the intersection of the northerly line of Belmont
Avenue.
Stream Protection - Description "L" = 75' wide strip of land on each side of Togus
Brook, running northeasterly, northerly, northeasterly, southeasterly, northeasterly
and northerly along Togus Brook from the northerly limits of General Development-
Description "D" to the Chelsea Town Line.