This is the exact embedded text of the captured official document.
Snapshot 258d093937b2 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
an
se
a c
n
;,\
mT^Tinll-.^:.
Town of
Readfield^ Maine
Adopted June 09, 2026
Revised: March 20, 2000; June 14, 2001; September 17, 2001; June 13, 2002; June 12, 2003; September 15, 2004; June 15, 2006;
June 16, 2007; May 15, 2008; June 11, 2009; June 10, 2010; June 14, 2012; June 13, 2013; June 12, 2014; June 9, 2015; June 14,
2016;June 13, 2017;June 12, 2018, June 11, 2019, July 14, 2020, November 2, 2021, June 14, 2022, June 13, 2023, June 11, 2024,
June 10, 2025
Attested true copy of what was passed at Town Meeting on June 09, 2026
Kristin M. Wilcox, Town Clerk
^-...
Table of Contents
Readfield Land Use Ordinance
Article 1
General Provisions
1 - 3
Section 1
Title
1
Section 2
Authority
1
Section 3
Purpose
1
Section 4
Effective Date
1
Section 5
Applicability
1
Section 5A
Vested Rights
1
Section 6
Relationship with Other Ordinances
2
Section 6A
Subsequent Changes In Statues And Rules
2
Section 7
Validity and Severability
2
Section 8
Amendments
2
Article 2
Administration, Enforcement and Penalties
4 - 5
Section 1
Administering Bodies and Agents
4
Section 2
Enforcement
4
Article 3
Non-Conformance
6 - 12
Section 1
Purpose
6
Section 2 General Allowances
6
Section 3 Non-Conforming Lots of Record
6
Section 4 Non-Conforming Structures
8
Section 5 Non-Conforming Uses
12
Article 4 Permit Requirements
13 - 15
Section 1 Permit Requirements
13
Section 2 Permits Not Required
13
Section 3 Permits and Certificates of Occupancy or Use Required
13
Section 4 Permits Issued After Appropriate Review
13
Section 5 General Permit Requirements
14
Section 6 Permit and Review Fee
14
Section 7 Expiration of Permit
14
Section 7A Permit Status upon Sale or Lease of Properties
14
Section 8 Plumbing Permit Required Prior to Land Use Permit
15
Section 9 Installation of Public Utility Service
15
Article 5 Permit Review Requirements
16
Section 1 Purpose
16
Section 2 Internal Plumbing and Subsurface Disposal Systems
16
Section 3 Allowed Uses
16
Section 4 Code Enforcement Officer Permit Review
16
Section 5 Site Review
16
Article 6 Permit Review, Application Procedures and Standards
17 - 36
Section 1 Purpose
17
Section 2 Code Enforcement Officer Permit Review
17
Section 3 Site Review
18
Article 7 Land Use Districts and Regulations
37 - 48
Section 1 Establishment of Districts
37
Section 2 Location of Districts
37
Section 3 Interpretation of District Boundaries
37
Section 4 District Purposes
37
Section 5 Land Uses
40
-Table 1: Table of Uses
41
Section 6 Space Standards & Dimensional Requirements (Table 2)
47
Article 8 Performance Requirements and Standards
49 - 119
Section 1 Dwellings Units
49
Section 2 Lots
55
Section 3 Sanitary and Water Quality Standards
56
Section 4 Home Occupations
57
Section 5 Day Care Facilities
60
Section 6 Flood Damage Prevention
60
Section 7 Stormwater Runoff
60
Section 8 Erosion Control
61
Section 9 Phosphorus Control
61
Section 10 Archaeological Sites
62
Section 11 Signs
62
Section 12 Lighting
67
Section 13 Commercial, Industrial, and Institutional Standards
68
Section 14 Parking Areas
69
Section 15 Traffic Access
69
Section 16 Resource Protection, Stream Protection and Shoreland Residential
Districts Standards
73
Section 17 Subdivisions
87
Section 18 Cluster Development
93
Section 19 Mobile Home Parks
97
Section 20 Mining and Mineral Extraction
101
Section 21 Campgrounds and Individual Private Campsites
104
Section 22 Junkyards, Automobile Graveyards and Auto Recycling
111
Section 23 Agriculture
113
Section 24 Seasonal Conversions of Residential Dwellings
114
Section 25 Small Wind Energy Systems
116
Article 9 Commercial and Industrial District Adoption Procedure
120 - 122
Section 1 Purpose
120
Section 2 Standards
120
Section 3 General Requirements
120
Section 4 Application Requirements
121
Article 10 Road Standards
123 - 126
Section 1 Purpose
123
Section 2 Applicability
123
Section 3 Limitations
123
Section 3A Acceptance of Private Roads
123
Section 4 Administration
124
Section 5 Construction Specifications
125
Section 6 Easements
126
Section 7 Driveway Entrances
126
Section 8 Utilities
126
Section 9 Inspection during Construction
126
Article 11 Definitions
127 - 143
Section 1 Construction of Language
127
Section 2 Definitions
127
APPENDIXES
Appendix A
Road Construction Standards
144
Appendix A-1
Road Construction Standards/Turnarounds
145
Appendix B
Other Town Ordinances Adopted by Reference
146
Appendix C
Riparian Rights Lines
147
Appendix D
Readfield Standard Conditions of Approval
148
Appendix E
DEP Pictorial of Greatest Practical Extent Setback Rule
151
NOTE: Words in the text printed in BOLD type are defined in Article 11; "Definitions."
Article 1: General Provisions
1
ARTICLE 1
GENERAL PROVISIONS
SECTION 1.
TITLE
This Ordinance is known and cited as the Town of Readfield Land Use Ordinance and shall be referred to
as "this Ordinance."
SECTION 2.
AUTHORITY
This Ordinance is adopted pursuant to the enabling provisions of Article VIII-A of the Maine
Constitution, the provisions of Title 30-A, MRSA Section 3001 (Home Rule), the State's Growth
Management Law, Title 30-A, MRSA Section 4312 et. seq., the Mandatory Shoreland Zoning Act, Title
38, MRSA Section 435 et. seq. and the Subdivision Law Title 30-A, MRSA Section 4401, et seq.
SECTION 3.
PURPOSE
The purpose of this Ordinance is to ensure that land use changes or developments, which may have major
or significant impacts on the Town, or parts thereof, will protect the health, safety and welfare of the
townspeople, consistent with the goals expressed in the Readfield Comprehensive Plan. This Ordinance
supplements the requirements of Federal and State laws, rules, regulations and ordinances.
SECTION 4.
EFFECTIVE DATE
This Ordinance takes effect upon its enactment by the Town.
Portions of this Ordinance applying within the shoreland district shall become effective upon approval by
the Commissioner of the Department of Environmental Protection. A certified copy of the Ordinance, or
Ordinance Amendment, attested and signed by the Municipal Clerk, shall be forwarded to the
Commissioner for approval. If the Commissioner fails to act on this Ordinance or Ordinance
Amendment, within 45 days of his/her receipt of the Ordinance, or Ordinance Amendment, it shall be
approved automatically. Any application for a permit in a shoreland district submitted to the municipality
within the 45 day period is governed by the terms of this Ordinance, or Ordinance Amendment, if the
Ordinance, or Ordinance Amendment, is approved by the Commissioner.
SECTION 5.
APPLICABILITY
The provisions of this Ordinance apply to all land; all land uses and all structures within the boundaries of
the Town of Readfield. No structure hereafter erected, moved, added to or structurally altered, no
existing structure and no land shall be used except under the rights vested through this Ordinance.
SECTION 5A. VESTED RIGHTS
In order for there to be a vested right to proceed with the construction, change of use or other
development of land under the existing Ordinance, three requirements must be met:
1. the commencement of the activity shall be pursuant to a validly issued permit;
1. the commencement shall be undertaken in good faith and diligently pursued with the
intention to continue with any development through to completion; and
2. there shall be a substantial construction start, as defined, within one year of the date
of issuance of a permit or its subsequent renewal as provided for in Article 4,
Section 7.
Article 1: General Provisions
2
SECTION 6.
RELATIONSHIP WITH OTHER ORDINANCES
Whenever a provision of this Ordinance conflicts with, or is inconsistent with, another provision of this
Ordinance or of any other ordinance, regulation or statute, the more restrictive provision shall control.
SECTION 6A. SUBSEQUENT CHANGES IN STATUTES AND RULES
References to State or Federal statutes or rules shall include subsequent revisions to those statutes or
rules.
SECTION 7.
VALIDITY AND SEVERABILITY
Should any section or provision of this Ordinance be declared by the courts to be invalid, such decision
does not invalidate any other section or provision of this Ordinance.
SECTION 8.
AMENDMENTS
A.
Initiation
A proposal for an amendment to this Ordinance may be initiated by:
1.
The Planning Board, by favorable majority vote of the Planning Board;
2.
The Select Board, through a request to the Planning Board;
3.
An individual, through a request to the Planning Board and subsequent favorable majority vote
of the Planning Board; or
4.
A written petition of a number of Readfield voters equal to at least 10% of the Readfield
voters in the last gubernatorial election.
B.
Procedure
1.
Any proposal for an amendment shall be made to the Planning Board in writing stating the
specific changes requested. An amendment initiated by petition shall be presented to the Board
of Selectmen who shall then transmit it to the Planning Board. When a change in zoning
boundaries is proposed, the proposal or petition shall state the nature, extent, and location of
the proposed boundary change, and shall be accompanied by a scale drawing showing the
areas to be changed, with dimensions. Any amendment shall be consistent with the Town of
Readfield Comprehensive Plan.
2.
Within 30 days of receiving a properly initiated amendment in accordance with Article 1,
Section 8.B (above), the Planning Board shall hold a public hearing on the proposal. Notice of
the hearing shall be posted in accordance with Title 30-A, MRSA, Sections 4352.9 and
4352.10, as amended, and shall be posted at the Town Office and other locations where
Planning Board notices are customarily posted at least 13 days prior to the public hearing, and
published at least twice in a newspaper of general circulation in the Town. The date of the
first publication shall be at least 12 days prior to the hearing and the date of the second
publication shall be at least 7 days prior to the hearing. The notice shall contain the time, date
and place of the hearing and sufficient detail about the proposed changes so as to give
adequate notice of its content. If the proposed change is extensive, a brief summary of the
change(s) together with an indication that a full text is available at the Town Clerk's office
shall be adequate notice. The notice shall be written in "plain English, understandable by the
average citizen." In the event the proposed amendment affects only certain geographic areas
of the Town and has the effect of either prohibiting all industrial, commercial or retail uses in a
Article 1: General Provisions
3
geographic area where any of these uses are currently permitted or permitting an industrial,
commercial or retail use where such a use is currently prohibited, notice to individual
landowners in the geographic area is required:
a. The notice shall contain a copy of a map indicating the portion of the Town affected by
the proposed amendments, and
b. The notice shall be mailed by first-class mail to the owners of record of each parcel
within or abutting the area affected by the proposed amendment by first class mail and
a Certificate of Mailing shall be obtained from the postal clerk at least 10 days prior to
the hearing. Notice shall be sent by first class mail to the last known address of the
owner of record according to records of the Town Assessor. The Certificate of Mailing
shall be retained as a part of the official records for the proposed amendment. The
Code Enforcement Officer or his/her designee shall prepare and file with the Town
Clerk a written certificate indicating the name and address of persons to whom notice
was mailed, the date and location of the mailing and the person who actually mailed it.
3. Within 20 days of the public hearing, the Planning Board shall make a written
recommendation regarding the proposed amendment prior to any action on the amendment
by the Town.
4.
In addition to the requirements of Section 8.B.1, if land is proposed to be designated as a
Commercial and Industrial District, the proposal shall contain provisions that meet the
standards of Article 9, Section 2.
C.
Adoption
1. Any amendment to this Ordinance shall be adopted by a majority vote of the Town Meeting.
2. Copies of amendments affecting the Shoreland Residential District, Stream Protection District
or the Resource Protection District, certified by the attested signature of the Town Clerk, shall
be submitted to the Commissioner of the Department of Environmental Protection within 14
days of acceptance by the Town Meeting and shall not be effective unless approved by the
Commissioner. If the Commissioner fails to act on any amendment within 45 days of the
receipt of the amendment, the amendment is automatically approved. Any application for a
permit submitted to the Town within this 45 day period shall be governed by the terms of the
amendment, if such amendment is approved by the Commissioner.
Article 2: Administration, Enforcement and Penalties
4
ARTICLE 2
ADMINISTRATION, ENFORCEMENT AND PENALTIES
SECTION 1. ADMINISTERING BODIES AND AGENTS
A. Code Enforcement Officer (CEO) and Alternate
1.
Appointment. A Code Enforcement Officer shall be appointed and an Alternate may be
appointed or reappointed annually by the Town Manager to a term which shall be no less than
one year, except for temporary appointments of an Alternate CEO which may be for a shorter
duration. The Alternate CEO shall have all the duties, responsibilities and authority of the
CEO in the absence of the CEO, in the event of a conflict of interest involving the CEO, or in
support of the CEO as directed by the Town Manager. The Town Manager shall notify all
appropriate state agencies of each appointment.
2.
Powers and Duties. The Code Enforcement Officer shall have the following powers and
duties in addition to those provided for in Section 2.B of this Article:
a.
Interpret and enforce the provisions of this Ordinance.
b. Act upon permit applications, review applications requiring Planning Board review, and
refer requests for variances and administrative appeals to the Board of Appeals.
c. Enter any property at reasonable hours or enter any building with the consent of the
property owner, occupant or agent, to inspect the property or building for compliance
with this Ordinance in accordance with the provisions of Title 30-A M.R.S.A., Section
4452.
d. Investigate complaints and reported violations, and take action as appropriate.
e. Revoke any permits issued in error or which are based on erroneous information.
f. Exercise any additional powers or duties authorized by the statutes.
g. Exercise additional duties as directed by the Select Board or Town Manager.
h. Develop permit application forms.
B. Planning Board
The Planning Board shall be maintained in accordance with State Law and shall be responsible for
reviewing and acting upon Site Review Applications, and as otherwise provided herein. Following
approval by the Planning Board, applicants shall return to the Code Enforcement Officer for a
Building Permit, if applicable.
C.
Board of Appeals
The powers and duties of the Board of Appeals include hearing and making binding decisions on
appeals in regard to final decisions of the Code Enforcement Officer or the Planning Board and
granting or rejecting variance requests. The Board of Appeals must be maintained in accordance
with the provisions of Title 30-A, M.R.S.A., Section 2691. The Board of Appeals is governed by
the Board of Appeals Ordinance.
SECTION 2. ENFORCEMENT
A. Nuisances
Any violation of this Ordinance shall be deemed to be a nuisance in accordance with the provisions
of Title 30-A M.R.S.A., Section 4302.
Article 2: Administration, Enforcement and Penalties
5
B. Code Enforcement Officer Actions
1.
It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer determines that any provision of this Ordinance is
being violated, the Code Enforcement Officer shall take action. Such action may include
ordering the discontinuance of illegal use of land, buildings or structures, or work being
conducted; removal of illegal signs, removal of illegal buildings, structures; and abatement of
nuisance conditions. A copy of such order shall be maintained as a permanent record.
2. The Code Enforcement Officer shall conduct on-site inspections to insure compliance with all
applicable laws and conditions attached to permit approvals. The Code Enforcement Officer
shall also investigate all complaints of alleged violations of this Ordinance and shall take
appropriate action.
3. When any violation of any provision of this Ordinance, including failure to comply with any
subdivision or site plan approved by the Planning Board, any condition imposed by the Board
of Appeals or any order of the Code Enforcement Officer shall be found to exist, the Code
Enforcement Officer shall notify the Municipal Officers who may then institute any and all
actions to be brought in the name of the Town.
4.
The Code Enforcement Officer shall keep a complete record of all essential transactions of the
office, including applications submitted, permits granted or denied, variances granted or
denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
C. Legal Actions
When the actions described in subsection B, above, do not result in the correction or abatement of
the violation or nuisance condition, the Board of Selectmen, upon notice from the Code
Enforcement Officer, may institute any and all actions and proceedings, including seeking
injunctions of violations and the imposition of fines, that may be appropriate or necessary to
enforce the provisions of this Ordinance in the name of the Town of Readfield.
The Board of Selectmen, following the conclusion of the administrative process in Section 1, may
enter into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without court action. Such agreements shall not allow an illegal
structure or use to continue, unless there is clear and convincing evidence that the illegality was a
direct result of erroneous information or advice given by the Code Enforcement Officer, and there
is no evidence that the owner/violator acted in bad faith, or unless the removal of the structure or
use will result in a threat or hazard to public health, safety and welfare or will result in substantial
environmental damage.
D. Civil Penalties
Any person, including but not limited to a landowner, agent or a contractor, who orders or conducts
any activity in violation of this Ordinance shall be subject to the penalties prescribed in Title 30-A,
M.R.S.A., Section 4452. The minimum penalty for a specific violation shall be $100 per day and
the maximum penalty shall be $2,500 per day. Notwithstanding the foregoing, the maximum
penalty for any violation of this Ordinance shall be $5,000 per day if the violation occurs within an
area zoned for resource protection.
Article 3: Non-Conformance
6
ARTICLE 3
NON-CONFORMANCE
SECTION 1.
PURPOSE
The purpose of this Article is to promote land uses which conform to the terms of the Town's Ordinances,
except that legally created non-conforming conditions which existed before the effective date of this
Ordinance shall be allowed to continue, subject to the requirements of this Article. A non-conforming
condition shall not be permitted to become more non-conforming.
SECTION 2.
GENERAL ALLOWANCES
A. Transfer of Ownership:
Non-conforming structures, lots, and uses may be transferred, and the new owner may continue the
non-conforming use or continue to use the non-conforming structure or lot, subject to the provisions
of this Ordinance.
B. Repair and Maintenance:
Normal upkeep and maintenance of non-conforming uses and structures including repairs or
renovations which do not involve expansion of the non-conforming use or structure, and such other
changes in a non-conforming use or structure as Federal, State, or local building and safety codes
may require, shall be allowed without development review.
SECTION 3.
NON-CONFORMING LOTS OF RECORD
A. Limited Exceptions
A lot which was specifically described as an identifiable and separate lot either in the instrument
conveying such lot to the then-owner or in a valid and enforceable agreement for purchase and sale
or lease shown on a plan recorded in accordance with the law, prior to certain dates must meet
lesser requirements than described in the dimensional standards of this Ordinance as set forth
below:
Minimum Lot Requirements
Effective Date of Requirements
Area Frontage Depth
March 12, 1977
80,000 sq. ft. 200 ft. 200 ft.
March 10, 1973
40,000 sq. ft. 200 ft. 200 ft.
November 1, 1969
20,000 sq. ft. 100 ft. ------
May 18, 1965
15,000 sq. ft. 100 ft. 150 ft.
Prior to May 15, 1965
------------- None-----------------------------
A.1. Reconfiguration and Conveyance of Non-Conforming Lots
With a permit from the Planning Board, any non-conforming lot may be increased or decreased in
size by the conveyance of land to or from an abutting lot, subject to the following terms and
conditions:
1. The conveyance shall remove or decrease to the greatest extent possible any existing non-
conformities;
2. Any conveyance shall not cause an existing conforming lot or structure to become non-
conforming.
3. To the extent the abutting lot or any structures thereon from which land is conveyed shall be
Article 3: Non-Conformance
7
made more non-conforming, restrictions that limit or prohibit development and/or change of
use on such abutting lot shall be imposed; and
4. In the Shoreland Districts, the conveyance may include restrictions on the non-conforming lot
that prohibit development, and/or change of use on the lot as prescribed in Section 4.D of this
Article.
For purposes of this subsection, the installation of a subsurface wastewater disposal system shall not be
deemed a "development" or an "expansion".
In order to be effective, conveyances and restrictions approved by the Planning Board shall be recorded at
the Kennebec County Registry of Deeds within ninety (90) days of the date of Planning Board decision
and an attested copy of such recording shall be filed with the Code Enforcement Office within thirty (30)
days following the date of recording.
B.
Vacant Lots
1.
Non-conforming vacant lots of record which are part of a land subdivision approved by the
Planning Board or other appropriate review authority, recorded in the Kennebec County
Registry of Deeds at the time of Ordinance enactment, and not located in a Shoreland
Residential, Resource Protection or Stream Protection District, may be built upon provided
that dimensional requirements governing the placement of structures are met and that all
other requirements of this Ordinance and State law are met.
2.
Any other non-conforming vacant lot of record may be built upon provided that such lot is in
separate ownership and not contiguous with any other vacant lot in the same ownership, and
that all provisions of this Ordinance except lot area, lot width, or shore or road frontage can
be met. Variance of setbacks or other requirements not involving area, width or shore or road
frontage shall be obtained only by action of the Board of Appeals.
3.
If two or more contiguous lots or parcels are in single or joint ownership of record at the time
of or since adoption or amendment of this Ordinance, if any of these lots do not individually
meet the dimensional requirements of this Ordinance or subsequent amendments, and if one
or more of the lots are vacant or contain no principal structure, the lots shall be combined to
the extent necessary to meet the dimensional requirements. This provision shall not apply to
2 or more contiguous lots, at least one of which is non-conforming, owned by the same
person or persons on the effective date of this Ordinance and recorded in the registry of deeds
if the lot is served by a public sewer or can accommodate a subsurface wastewater disposal
system in conformance with the State of Maine Subsurface Wastewater Disposal Rules, and:
a. Each lot contains at least 100 feet of shore and/or road frontage and at least 20,000
square feet of lot area; or
b.
Any lots that do not meet the frontage and lot size requirements are reconfigured or
combined so that each new lot contains at least 100 feet of shore and/or road frontage
and 20,000 square feet of lot area.
C. Built Lots
If two or more contiguous lots or parcels are in single or joint ownership of record at the time
of adoption of this Ordinance, if all or part of the lots do not meet the dimensional
requirements of this Ordinance, and if a principal use or structure exists on each lot, the non-
conforming lots may be conveyed separately or together, provided that the State Minimum
Lot Size Law and Subsurface Wastewater Disposal Rules are complied with.
Article 3: Non-Conformance
8
If two or more principal uses or structures existed on a single lot of record, and both are in
compliance with this Ordinance on the effective date of this Ordinance, each may be sold on
a separate lot provided that each complies with the above-referenced law and rules, and each
lot so created shall be as conforming as possible to the dimensional requirements of this
Ordinance, as determined by the Planning Board.
SECTION 4.
NON-CONFORMING STRUCTURES
A. Relocation
1.
A non-conforming structure may be relocated within the boundaries of the parcel on which
the structure is located, subject to Planning Board review, provided the site of relocation
conforms to all setback requirements to the greatest practical extent as determined by the
Planning Board in accordance with paragraphs 4.E (1-3) below, and provided:
a) the applicant demonstrates the present subsurface sewage disposal system meets the
requirements of the State of Maine Subsurface Wastewater Disposal Rules, or that a new
system can be installed in compliance with the Law and said Rules, and
b) any expansion of a relocated structure shall be in conformance with the provisions of
paragraph 4.E: and
c) the structure is not relocated in a manner that causes the structure to become more non-
conforming.
2.
When it is necessary to remove vegetation in order to relocate a structure, that vegetation
shall be replaced in accordance with the standards of paragraph 4.F.
B. Reconstruction or Replacement
1.
Any non-conforming structure which fails to meet the requirements of this Ordinance, and
which is removed, or damaged or destroyed, regardless of the cause, by more than 50% of the
market value of the structure before such damage, destruction or removal, may be
reconstructed or replaced provided that a permit is obtained within one year of the date of
said damage, destruction or removal and provided that such reconstruction or replacement is
in compliance with all requirements of this Ordinance to the greatest practical extent as
determined by the Planning Board in accordance with paragraph 4.E.(1-3) below. In no case
shall a structure be reconstructed or replaced so as to increase its non-conformity. A
reconstructed or replacement structure shall not be any larger than the original structure,
except as allowed pursuant to paragraph 4 (G). When it is necessary to remove vegetation in
order to replace or reconstruct a structure, that vegetation shall be replaced in accordance
with the standards of paragraph 4.F.
2.
Any non-conforming structure which is damaged or destroyed by 50% or less of the market
value of the structure, excluding normal maintenance and repair, may be reconstructed in
place with a permit from the Code Enforcement Officer.
C. Foundations
Whenever a new, enlarged or replacement foundation is constructed beneath an existing non-
conforming structure, the development is subject to Planning Board Site Review and the structure
and new foundation shall be placed such that the setback requirements are met to the greatest
practical extent as determined by the Planning Board in accordance with paragraph 4.E (1-3). The
following requirements must also be met:
Article 3: Non-Conformance
9
1.
The completed foundation will not extend beyond the exterior dimensions of the structure,
except for expansions in conformity with Section 4 (G); and
2.
The foundation will not cause the height of the structure to be elevated by more than three (3)
additional feet or the height of the existing structure if it exceeds the maximum allowable
height, whichever is greater.
If the new foundation includes a basement and the structure is relocated at least 50 feet from the
normal high-water line of a water body, then the foundation shall not be considered an expansion of
the floor area of the structure.
D. Change to the height of a non-conforming structure in the shoreland zone:
Notwithstanding the limitations on height imposed under Section 4 (G), the height of a structure
that is a legally existing nonconforming principal or accessory structure may be raised to, but not
above, the minimum elevation necessary to be consistent with the local floodplain management
elevation requirement or to 3 feet above base flood elevation, whichever is greater, as long as the
structure is relocated, reconstructed, replaced or elevated within the boundaries of the parcel so
that the water body or wetland setback requirement is met to the greatest practical extent. This
paragraph applies to structures that:
1. Have been or are proposed to be relocated, reconstructed, replaced or elevated to be consistent
with the local floodplain management elevation requirement; and
2. Are located in an area of special flood hazard.
E. The Greatest Practical Extent Test:
1. In determining whether the building relocation, reconstruction or replacement, or the construction
of a new, enlarged or replacement foundation beneath an existing non-conforming structure
meets the setback requirements to the "greatest practical extent," the Planning Board shall
consider all relevant factors including, but not limited to: the size of the lot, the slope of the land,
the height of the building, the potential for soil erosion, the location of other structures on the
property and/or adjacent properties, the location of the septic systems, the location of any existing
easements, the type and condition of the building's foundation, the type and amount of vegetation
to be removed to accomplish the relocation. Further, the Planning Board shall determine that
such relocation, reconstruction, replacement or foundation construction does not cause an
"increase in non-conformity" as defined in paragraph 4.E.2 below.
2. For purposes of this section, "increase in non-conformity" means further deviation from the
dimensional standard(s) creating the non-conformity such as, but not limited to, reduction in
waterbody, wetland, road, or property boundary setback distances, increase in lot coverage, or
increase in height of a structure, except that the permitting authority may allow a decrease of the
required non-waterbody or non-wetland setback distance(s) of up to 50% if:
a) That decrease results in an increase in the setback distance from the waterbody/wetland;
and,
b) The sum of all dimensional setback distances remains the same or is increased; and,
c) No objection to such setback decrease is expressed prior to the close of the public hearing
on the application that includes the decrease, by any abutter potentially affected; and,
d) Any such decrease is otherwise consistent with the provisions of the Land Use
Ordinance.
NOTE: Example: Required setbacks are: 100 feet from water, 20 feet from side property lines,
and 50 feet from roads. An existing non-conforming house/foundation is 30 feet from the water
Article 3: Non-Conformance
10
and meets all other setbacks. Proposal is to move the house/foundation back to 90 feet from the
water, i.e. the greatest practical extent, resulting in a gain of 60 feet in conformity. However, to
achieve this, the house/foundation will now be 15 feet from each side setback and 40 feet from
the road. That is an increase in non-conformity of 20 feet (5+5+10), for a net gain of 40 feet in
conformity (60-20). This results in an increase in setback from the water and an increase in the
sum of all setbacks.
3. If the total footprint of the original structure can be relocated, replaced or reconstructed beyond
the required waterbody setback area, then no portion of the relocated, replaced or reconstructed
structure shall be replaced, reconstructed or relocated at less than the setback requirements for a
new structure nor shall such a structure be expanded into the set-back area. See Appendix E:
DEP Pictorial of Greatest Practical Extent Setback Rule
F.
Vegetation Removal and Replacement
1.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate, reconstruct or replace a structure, the Planning Board shall require replanting of
native vegetation to compensate for the destroyed vegetation. In addition, the area from
which any structure is removed or relocated must be replanted with vegetation consisting of
grasses, shrubs, trees, or a combination thereof.
2
Trees removed in order to relocate, reconstruct or replace a structure must be replanted with
at least one native tree, three (3) feet in height, for every tree removed. If more than five
trees are planted, no one species of tree shall make up more than 50% of the number of trees
planted. Replaced trees must be planted no further from the water or wetland than the trees
that were removed.
3. Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed in
order to relocate, reconstruct or replace a structure must be re-established. An area at least
the same size as the area where vegetation and/or ground cover was disturbed, damaged, or
destroyed must be re-established within the setback area.
G. Expansions
A non-conforming structure may be added to or expanded after obtaining a permit from the same
permitting authority as that for a new structure, if such addition or expansion does not increase the
non-conformity of the structure, as defined in paragraph 4.E.2 if applicable, and is in accordance
with subparagraphs 1 through 4 below.
Expansion of a nonconforming structure to create an accessory dwelling unit may not result in an
increase in non-conformity (See Article 3, Section 4.E.2).
Legally existing non-conforming principal and accessory structures that do not meet the water body
or wetland setback requirements may be expanded or altered as follows, as long as all other
applicable standards contained in this Ordinance are met. Any permitted expansion must be
recorded at the registry of deeds. Expansion of a relocated, reconstructed or replaced non-
conforming structure shall not be permitted unless the original structure is first determined to have
achieved setback conformity to the greatest practical extent as provided in paragraph 4.E. When an
existing non-conforming structure already meets or exceeds the maximum combined total floor area
limit as established in paragraph 4.(G), no expansion shall be permitted.
1.
Expansion of a structure, any portion of which is located within 25 feet, horizontal distance,
of the normal high-water line of a water body, tributary stream or upland edge of a wetland is
prohibited, even if the expansion will not increase nonconformity with the water body,
Article 3: Non-Conformance
11
tributary stream, or wetland setback requirement.
2.
Expansion of an accessory structure that is located closer to the normal high-water line of a
water body, tributary stream, or upland edge of a wetland than the principal structure is
prohibited, even if the expansion will not increase nonconformity with the water body,
tributary stream, or wetland setback requirement.
3.
For structures, any portion of which is located less than 75 feet, horizontal distance, from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland,
expansion shall not cause the maximum combined total floor area for all portions of those
structures to exceed 1,000 square feet. The maximum height of any portion of such a
structure may not be made greater than 20 feet or the height of the existing structure,
whichever is greater.
4.
For structures, any portion of which is located less than 100 feet, horizontal distance, from
the normal high-water line of a waterbody, expansion shall not cause the maximum combined
total floor area for all portions of those structures to exceed 1,500 square feet. The maximum
height of any portion of such a structure may not be made greater than 25 feet or the height of
the existing structure, whichever is greater.
H.
Change of Use of a Non-Conforming Structure
1.
The use of a non-conforming structure shall not be changed to another use unless the
Planning Board, after receiving a written application, determines that the new use shall not
have a greater adverse impact on the water body, tributary stream or wetland or on the subject
or adjacent properties and resources than the existing use.
2.
In determining that no greater adverse impact shall occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on the public safety,
erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover, visual
and actual points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources and functionally water-dependent uses.
I.
Accessory Structures
1.
One non-conforming accessory structure not to exceed eighty (80) square feet in floor area,
nor eight (8) feet in height, may be placed on a legally-existing non-conforming lot of record
for the storage of the personal property of the property owner only, provided all of the
following conditions can be met:
a) there is no existing storage building on the lot,
b) there has been no conversion of a previously existing storage building to another use,
c) there is no location on the lot on which to locate a fully conforming building,
d) the building does not cause the lot to exceed any applicable lot coverage or vegetation
clearing limitations;
e) no utilities are connected to the structure;
f) the proposed structure is located to conform to all setbacks requirements to the greatest
practical extent and located no closer to the normal high-water line of a waterbody,
tributary stream, or upland edge of a wetland than is the principal structure, and
g) A permit is obtained from the Code Enforcement Officer prior to placement or
construction of the storage building.
Article 3: Non-Conformance
12
SECTION 5. NON-CONFORMING USES
A. Expansions Other Than Commercial and Industrial
Expansions of non-conforming uses are prohibited, except that non-conforming uses other than
commercial and industrial uses may, after obtaining approval of the Planning Board and a permit
from the Code Enforcement Officer, be expanded within structures existing as of the effective date
of this Ordinance, or on the effective date of any subsequent amendment that causes such use to be
non-conforming.
B
Expansions of Existing Non-Conforming Commercial and Industrial Uses
Non-conforming commercial and industrial uses, legally in existence as of June 11, 1998, located
within the Village, Village Residential, Rural and Rural Residential Districts may be allowed to
expand up to 100% of their existing developed area provided such expansion takes place on the
existing lot or on land contiguous to the existing lot. The developed area includes structures,
parking lots, and outside storage and processing areas. Any proposed expansion of a commercial or
industrial use shall be reviewed by the Planning Board under site review.
Any proposed expansion greater than 100% of the existing developed area shall require an
amendment to this Ordinance, effect a rezoning, in compliance with Article 1, Section 8.
C. Resumption Prohibited
A lot, building or structure in or on which a non-conforming use is discontinued for a period
exceeding one year, or is superseded by a conforming use, may not again be devoted to a non-
conforming use, except that the Planning Board may, for good cause shown by the applicant, grant
up to a one year extension to that time period. In the case of a non-conforming residential use, such
use may be renewed even if it has been discontinued for more than one year, provided that the
structure has been used or maintained for residential purposes during the preceding full 5 year
period.
D. Change of Use
An existing non-conforming use may be changed to another non-conforming use provided that the
proposed use has no greater adverse impact on the subject and adjacent properties and resources
than the former use, as determined by the Planning Board. In determining that no greater adverse
impact will occur, the Planning Board shall require written documentation from the applicant,
regarding the probable effects on public health and safety, erosion and sedimentation, water quality,
fish and wildlife habitat, vegetative cover, visual and actual points of public access to waters,
natural beauty, floodplain management, archeological and historic resources, any functionally
water-dependent uses, changes in traffic (volume and type), parking, noise, potential for litter,
wastes or by-products, fumes, odors, or other nuisances likely to result from such change of use.
Article 4: Permit Requirements
13
ARTICLE 4
PERMIT REQUIREMENTS
SECTION 1. PERMIT REQUIREMENTS
Permits shall be required and issued conditionally for the following:
A.
The construction, reconstruction, addition to, demolition, movement, or structural alteration of a
building or structure, including temporary buildings or structures, when the fair market value of
labor and materials used therein exceeds $2,000.00 cumulatively within a 12-month period.
B.
Installation or construction of a mobile home, or erection of a modular home.
C. Expansion, resumption or change of use of a non-conforming use.
D.
Subdivision or Resubdivision
E.
Cluster Development
F.
Mobile Home Park
G.
For a new or expanded residential, commercial, industrial, institutional, or outdoor-resource land
use activity as listed in the Land Use Table in Article 7.
H.
Any new, expanding or changing land use requiring a permit identified in Table 1/Table of Uses,
Article 7, Section 5 of this Ordinance.
I.
Installation or relocation of internal plumbing, or subsurface wastewater disposal systems or their
components.
J.
The installation, alteration or illumination of any sign as required in Article 8, Section 14.
K.
The construction of a new entrance onto a public or privately owned road or Right of Way.
L.
Any land use for which a permit by other authorities, including but not limited to state or federal, is
required.
SECTION 2. PERMITS NOT REQUIRED
Permits are not required for the following:
A.
For an allowed land use activity as indicated in the Land Use Table in Article 7.
B.
For the normal repair and maintenance of any structure.
C.
Whenever any construction, erection, improvement, addition, enlargement, alteration, demolition,
or movement of any building or structure, including temporary structures, when the fair market
value of such labor and materials used is less than $2,000.00 cumulatively within a 12-month
period. However, all work shall conform to the applicable standards of this Ordinance.
SECTION 3. PERMITS AND CERTIFICATES OF OCCUPANCY OR USE REQUIRED
A. A permit shall be obtained for all those activities listed in Section 1 prior to the start of any
construction, site work, or commencement of a land use activity.
B. A Certificate of Occupancy or Use shall be obtained from the Code Enforcement Officer upon
completion of all activities requiring a permit in Section 1 above for which a permit is issued
conditionally. All Certificates of Occupancy or Use shall be obtained prior to the occupancy or use
of said permitted activities and shall be issued upon completion of all permit requirements and/or
conditions of approval. The Code Enforcement Officer may conduct an on-site inspection prior to
issuing a Certificate of Occupancy or Use and may require additional or corrective work to be
completed to the extent necessary to ensure compliance with all requirements and/or conditions
associated with the permit.
SECTION 4. PERMITS ISSUED AFTER APPROPRIATE REVIEW
All permits shall be obtained from the Code Enforcement Officer after meeting the appropriate review
requirements established in Article 5 of this Ordinance.
Article 4: Permit Requirements
14
SECTION 5. GENERAL PERMIT REQUIREMENTS
A.
Each permit applicant shall submit, on the form provided by the Town, a written application.
B.
All applications shall be signed by the owner(s) of the property, or a person with right, title, or
interest in the property, or a duly authorized agent, and such signature shall certify that the
information in the application is complete and correct.
C.
All applications shall be dated, and the Code Enforcement Officer shall note upon each application
the date and time of its receipt.
D. The applicant shall have the burden of proving that the proposed land use activity is in conformity
with the purposes and provisions of this Ordinance.
E.
If a permit is denied, the reasons shall be stated in writing.
F. Applications for permits with their accompanying plans shall be maintained as a permanent record
by the Town.
G.
The Code Enforcement Officer may attach conditions to the permit to ensure compliance with the
standards and criteria of this Ordinance. All conditions shall be stated in writing and listed on the
permit.
SECTION 6. PERMIT AND REVIEW FEE
Permit application and application review fees including variances and administrative appeals fees shall
be set by the Board of Selectmen. These fees shall be non-refundable and submitted by the applicant to
the Code Enforcement Officer at the time of application. The application shall not be considered complete
until the appropriate fee is paid.
SECTION 7. EXPIRATION OF PERMIT
Following the issuance of a permit, if no substantial construction start is made, or no active use of the
property is initiated for which such permit has been issued, within one year of the date of the permit, the
permit lapses and becomes void. However, the permit may be renewed by the original permitting
authority for one additional year if no material change in the proposed use or applicable Ordinance
standards has occurred. However, for good cause shown, the Planning Board may determine that the
applicant's permit may be amended to require compliance as determined by the Planning Board.
In the Shoreland Districts, the applicant shall have one year to make a substantial construction start and
one additional year to complete construction, or, if no start has been made within the first year and a
renewal permit is obtained, the applicant shall have one year from the date of the renewal permit to
complete construction.
Subdivision approvals, if approved by the Planning Board and properly recorded at the Kennebec County
Registry of Deeds, do not expire.
SECTION 7A. PERMIT STATUS UPON SALE OR LEASE OF PROPERTIES
A permit or approval issued by the Code Enforcement Officer or the Planning Board "runs with the land"
(i.e., remains in effect if property is transferred to a new owner or lessee) unless it expires pursuant to
Section 7 above, or the approved use is abandoned or discontinued. This excludes permits for marijuana
establishments which are specific to the business owner. For purposes of this section, "abandoned or
discontinued" means not conducting the approved activity for a period of 2 consecutive years, unless an
extension is mutually agreed upon in writing by the Town and the property owner/lessee prior to the
expiration of the initial 2 consecutive year timeframe. If an approved activity or use is abandoned or
discontinued, the permit lapses and becomes void.
A purchaser or lessee of a property that is the subject of a permit or approval assumes all rights and
obligations granted by the permit and may continue the permitted activity or development subject to all its
Article 4: Permit Requirements
15
terms and conditions. If a purchaser or lessee intends to, or undertakes, activity that constitutes a change
of use or an expansion or is otherwise inconsistent with all terms and conditions of the permit/approval, a
new application or an application for a permit revision to the previously approved plan or activity is
required in accordance with Article 6, Section 3(H).
All developments approved under Article 9 shall be required to obtain Planning Board review prior to any
change in ownership to determine ability of the new owner to meet the financial and technical capacity
standards of Article 6, Section 3(G)(5) and to provide updated performance guarantees.
SECTION 8. PLUMBING PERMIT REQUIRED
No land use permit shall be issued for any structure or use involving the construction, installation, or
alteration of plumbing facilities unless a valid "sewage disposal system design or letter of soils suitability
prepared by a Licensed Site Evaluator" has been secured by the applicant, or authorized agent, in
conformance with the State of Maine Subsurface Wastewater Disposal Rules. In addition, there shall be
compliance with the requirements of this Ordinance.
SECTION 9. INSTALLATION OF PUBLIC UTILITY SERVICE.
A public utility, water district, sanitary district, or any utility company of any kind may not install
services to any new structure unless and until written authorization attesting to the validity and currency
of all permits herein required for that structure under this Ordinance has been issued by the Code
Enforcement Officer
Article 5: Permit Review Requirements
16
ARTICLE 5
PERMIT REVIEW REQUIREMENTS
SECTION 1.
PURPOSE
Activities listed in Article 4, Section 1, which require a permit shall be reviewed according to the review
classification established in this Article.
SECTION 2. INTERNAL PLUMBING AND SUBSURFACE DISPOSAL SYSTEMS
Internal plumbing and subsurface wastewater disposal systems that require a permit according to the State
of Maine Internal and Subsurface Wastewater Disposal Rules shall be reviewed by the Local Plumbing
Inspector (LPI). A permit shall be issued if the application complies with the Internal Plumbing and
Subsurface Wastewater Disposal Rules, the applicable provisions of this Ordinance, and with the
requirements contained in Article 8, Section 6.
SECTION 3. ALLOWED USES
Allowed uses as indicated in Article 7, Land Use Table, do not require a permit or permit review,
provided owners remain responsible for meeting all applicable provisions of this Ordinance,
including but not limited to those pertaining to signs in Article 8, Section 14
SECTION 4. CODE ENFORCEMENT OFFICER PERMIT REVIEW
Land use activities as indicated in Article 7, Land Use Table, (Activities listed in the table as "C") shall
be reviewed by the Code Enforcement Officer. A permit shall be issued by the Code Enforcement Officer
after review if the proposal complies with all applicable provisions of this Ordinance, and shall be subject
to the Standard Conditions of Approval unless specifically exempted or deemed to be not applicable.
SECTION 5. SITE REVIEW
Land use activities as indicated in Article 7, Land Use Table, (Activities listed in the table as "P") shall be
reviewed by the Planning Board. After the Planning Board approves a site review application, a notice of
decision including all applicable conditions of approval, including the standards Conditions of Approval
shall be forwarded to the applicant within 7 days following the next Planning Board meeting. An
additional building or use permit may be required from the Code Enforcement Officer. The Planning
Board shall approve a site review application if the proposal complies with the applicable provisions of
this Ordinance. When reviewing a sketch plan for a subdivision, the Planning Board shall make a
determination upon review of the sketch plan whether a proposed subdivision constitutes a major or a
minor subdivision as defined in Article 11 of this Ordinance.
Article 6: Permit Review, Application Procedures and Standards
17
ARTICLE 6
PERMIT REVIEW, APPLICATION PROCEDURES AND STANDARDS
SECTION 1. PURPOSE
The purposes of Development Review are to:
A.
Provide a level of municipal review that would not otherwise occur for projects that could adversely
impact the surrounding Community as a whole;
B.
Maintain and protect the Town's rural character and natural resources, including scenic and historic
resources, by requiring that structures, signs and other alterations on, or to the land, are sited and
developed in accordance with certain standards; and
C. Promote and protect the health, safety and welfare of the Townspeople, and provide permanent
records of conditions that run with ownership of property.
SECTION 2. CODE ENFORCEMENT OFFICER PERMIT REVIEW
A. Applicability
This section shall apply to all land use activities that require Code Enforcement Officer review.
B. Application Procedure
1. Within 14 days of receiving a permit application, the Code Enforcement Officer shall determine
if the application is complete. The Code Enforcement Officer shall notify the applicant in writing
if the application is incomplete and shall specify the additional material needed to make the
application complete.
2. Within 14 days of determining that the application is complete, the Code Enforcement Officer
shall, in writing approves, deny, or approve the application with conditions.
3. Any conditions, modifications and waivers to permits shall be in a form suitable for filing with
the Registry of Deeds. Prior to commencing work under a permit, proof of such filing shall be
provided to the Code Enforcement Officer.
C. Submission Requirements
A permit application shall be made on the forms provided by the Town and shall contain the
following:
1. A copy of the deed to the property, option to purchase the property or other documentation to
demonstrate right, title or interest in the property on the part of the applicant.
2. A written description of the project including estimated cost.
3. Receipt of application fee, payable to the Town of Readfield.
4. A schedule of construction, including anticipated beginning and completion dates.
5. A map drawn to scale, showing the location, boundaries, dimensions, elevations, uses and size of
the following: site, type of structure, setbacks from the front, side and rear lot lines, parking areas,
driveways, and existing and proposed roads or ways.
6. The location of all water bodies and their distance from all structures proposed for the site.
7. When a permit is to be issued for purposes of demolition, evidence that the structure to be
demolished originates in the Town of Readfield, all others being prohibited, identification of any
special waste, and the identity of the place and method of demolition, with evidence that no
provision of this Ordinance, including but not limited to Article 8, Section 19B, shall be violated,
and shall be provided with the application for such permit.
Article 6: Permit Review, Application Procedures and Standards
18
8. Any other information necessary to show that the proposal complies with the applicable
provisions of this Ordinance.
9. A list of all other state and federal permits required by the proposal.
C.
Review Criteria
The Code Enforcement Officer shall approve a permit application, or amendment thereto, according
to the following review criteria:
1. The proposal has obtained approval by the Planning Board for Site Review if applicable.
2. The permit and application fee has been paid.
3. The permit application is complete.
4. The proposal conforms to all the applicable provisions of this Ordinance.
5. The property currently is not in violation of any requirements of this Ordinance. If the Code
Enforcement Officer determines that an enforceable violation exists, the Code Enforcement
Officer shall issue a Notice of Violation to the applicant within the review period of time
provided for and the application, if otherwise approved, shall be conditioned upon the resolution
of the violation prior to the use or occupancy of the permitted activity applied for. This provision
shall not prohibit, restrict or otherwise preclude the applicant from appealing to the Board of
Appeals under Article 2 of this Ordinance any determination by the Code Enforcement Officer of
an alleged violation.
E.
Inspections
For any new structure, or for any expansion of the footprint of an existing structure, the applicant or
the applicant's agent or contractor shall notify the Code Enforcement Officer at least 48 hours prior
to commencement of construction of any foundation footing. The Code Enforcement Officer shall
determine by inspection or otherwise that the applicant is in compliance with all setback
requirements set forth in Table 2 of this Ordinance and as set forth in Chapter 7 of the Maine
Subsurface Waste Water Disposal Rules, and that all temporary soil erosion control measures have
been properly installed in compliance with Article 8, Section 11.
SECTION 3. SITE REVIEW
A. Applicability
This section shall apply to all land use activities that require Planning Board Review. Site review
shall not be required for the direct replacement of a conforming structure provided there is no
expansion of use or change of use in the structure.
B. Planning Board Site Review Procedure
All applications for site review shall follow the procedure outlined below:
a. Site review application forms shall be obtained from the Town of Readfield.
b. All site review applications shall be submitted to the Code Enforcement Officer. A dated receipt
shall be issued to the applicant upon payment of the appropriate fee. An application file shall be
established by the Code Enforcement Officer. All submissions and correspondence regarding the
application shall be maintained in the file. One complete copy of the site review application and
applicable submissions shall be submitted to the Code Enforcement Officer for review.
c. Within 30 days of the receipt of the site review application, the Code Enforcement Officer shall
make a preliminary determination whether the application is complete and notify the applicant in
Article 6: Permit Review, Application Procedures and Standards
19
writing of his/her decision. If the application is not complete, the Code Enforcement Officer shall
notify the applicant in writing of the specific material needed to complete the application.
d. The application shall be considered preliminarily complete when all the site review submission
requirements are included or when the applicant files a written waiver request. See Waiver
process below.
e. The Code Enforcement Officer shall notify the Planning Board of the preliminary determination
of completeness. The Planning Board shall schedule a meeting within 30 days after it has
received notification from the Code Enforcement Officer of the receipt of a completed
application.
f. The applicant shall submit either 11 copies of the complete application and applicable
submissions, or an electronic copy of the same, to the Code Enforcement Officer at least 14 days
prior to the next scheduled planning board meeting. The Code Enforcement Officer shall mail or
deliver one copy of the application to each Planning Board member at least 7 days prior to the
Planning Board meeting.
g. A complete copy of the site review application and submissions shall be kept on file at the Town
Office and shall be available for public review.
h. The Planning Board shall make a final determination of completeness and/or determine any
requested waiver of submission requirements. If the application is not complete, the Planning
Board shall notify the applicant of the items necessary to find the application complete. At this
point, the Planning Board may either deny the application, table action on the application until it
is complete or condition any next steps on the satisfactory submission of required information.
The Planning Board reserves the right to request additional information following the
determination of completeness, if relevant to the applicable review standards.
i.
The Planning Board will schedule a public hearing on any application it deems complete or
conditionally completed.
j.
The Planning Board may vote to schedule an on-site inspection of the proposed project at any
time. The Planning Board shall post the date, time and place of the site inspection at the Town
Office.
k. The purpose of the site visit shall be for the Planning Board to obtain knowledge about the site
and surrounding area. The Planning Board shall not render any decision concerning the
application during the visit. An applicant's refusal to permit a request site visit may cause denial
of the application.
l.
The Code Enforcement Officer shall publish a notice of the date, time, place, and purpose of the
public hearing in a newspaper of general circulation in the Town at least 10 days prior to the
public hearing.
m. The Code Enforcement Officer shall notify the applicant and all property abutters to the proposed
site by first class mail, at least 10 days prior to the public hearing. The notice shall include the
date, time, and place of the public hearing and a brief description of the proposal. A Certificate
of Mailing shall be obtained from the postal clerk at the time of mailing and retained as a part of
the official records of the application. Compliance with these requirements satisfies the
municipal abutter notification requirements.
n. The Code Enforcement Officer shall notify the Town Clerk and the Planning Board of any
neighboring towns if any portion of the application requires a site review that abuts or crosses the
Article 6: Permit Review, Application Procedures and Standards
20
town boundary. If any application for a site review crosses the town boundary, the Planning
Board shall follow the applicable procedure for conducting a joint meeting as contained in Title
30-A M.R.S.A., Sections 4401-4407.
o. The Planning Board may require the applicant to perform additional studies or hire a consultant to
assist the Planning Board with its review of the site review application. The cost to perform
additional studies or hire a consultant shall be borne by the applicant. The Planning Board may
require the applicant to deposit with the Town the estimated cost of any consultant or additional
study, which shall be placed in an escrow account. The Town shall pay for the services rendered
from the escrow account. If funds remain after payments are completed, the Town will return
them to the applicant. If necessary, the applicant shall place additional funds into the escrow
account upon request in order to meet expenses.
p. The Planning Board may extend the public hearing process beyond a single meeting for any good
cause shown, such as the need for additional submissions, studies, availability of Planning Board
members, the need to accommodate additional public input or the availability of the applicant.
q. The Planning Board may require that the application be amended to include the items necessary
to meet the submission requirements, review criteria and/or Ordinance performance standards.
The Planning Board may vote to suspend review of the application until such time that the
applicant supplies all the necessary information. no case shall the Planning Board make a final
decision on the application until the applicant supplies the additional information to the
satisfaction of the Planning Board .If the additional application materials or studies are not
submitted to the Planning Board within the additional prescribed time period, the Board may vote
to deny the application, table the application process, or accept a request by the applicant to
withdraw the application. The application may be resubmitted to the Planning Board at a later
date according to the requirements for a new application.
C. Decision Making
1. Within 60 days of the closing of the public hearing, the Planning Board shall make a decision on
the site review application. The Planning Board shall determine whether or not the proposed use
meets the applicable review criteria herein and meets all other applicable provisions of the
Ordinance including any appendices. The Planning Board may vote to approve the application,
deny the application, or approve the application with conditions.
2. The Planning Board may approve the application with conditions when the Planning Board
determines that the application has not met the review criteria, but that additional actions by the
applicant shall be sufficient to meet them. The Planning Board may require such actions as
conditions of approval. The conditions may set forth requirements in addition to those set forth in
this Ordinance only when the Planning Board finds it necessary to further the purposes of this
Ordinance. All conditions approved by the Planning Board shall be listed.
3. Within thirty (30) days of its decision, the Planning Board shall submit its written decision to the
applicant. The Planning Board, on its own initiative or at the request of an applicant or interested
party, may make written finding of fact to support its decision. The Planning Board shall list any
waivers approved by the Board in its decision and the reasons for such approval.
4. All decisions to approve an application shall be subject to the Standard Conditions of Approval,
unless specifically exempted or deemed not applicable.
5. The written decision shall provide notice that any person aggrieved by the decision may appeal
to the Readfield Board of Appeals within forty-five (45) days of the date of the decision. The
date of the decision is the date upon which the Planning Board has taken its final vote on the
application.
Article 6: Permit Review, Application Procedures and Standards
21
D. Vesting
The determination of the Planning Board that the application is complete shall be considered
the initiation of the review process for the purposes of bringing the application under the
protection of Title 1 M.R.S.A. Section 302.
E.
Waivers
1. The Planning Board may vote to waive any of the submission requirements, review criteria and/or
performance standards of this Ordinance, other than those set forth in Article 7, when it finds one
of the following:
a. One or more of the review criteria and/or Ordinance performance standards are not
applicable to the proposal due to the size of the project, circumstances of the site, design
of the project, or unique features of the proposed use;
b. The applicant has proposed an alternative design that meets or exceeds the requirements
set forth in the Ordinance performance standards; or
c. For submission requirements only, the Planning Board has on file or is otherwise in
possession of sufficient documentation or evidence related to the required submission.
2. The Planning Board may only consider a waiver when the applicant has submitted a written
waiver request. The Planning Board shall review the waiver request and if it meets the criteria
stated above shall approve the request and submit its decision to the applicant in writing. If the
Planning Board finds that the waiver request does not meet the criteria for a waiver, it shall deny
the waiver and submit its decision in writing to the applicant.
F. Site Review Submission Requirements:
The following materials should be submitted with an application for site review:
a. Copy of the portion of applicable tax map showing subject property and abutting
properties.
b. Names and addresses of all property abutters of the proposed development.
c. Exact directions to the property from the Town Office, using a map if necessary.
d. Map showing boundaries of all contiguous property under the control of the owner or
applicant, regardless of whether all or part is being developed at this time.
e. The tax map and lot number of the parcel or parcels.
f. A copy of the deed to the property or other documentation to demonstrate right, title or
interest in the property on the part of the applicant.
g. The name, registration number and seal of the land surveyor, architect, engineer and/or
similar professional who prepared any plan.
h. Map showing the north bearing and lot dimensions of all property lines of the property to
be developed and the source of this information.
i.
Site plan(s) illustrating the following: (Note: If the site plan is not drawn to scale, then
specific distances identifying the relative locations of the following features must be
shown on the plan.)
1) The location and size of any existing and proposed sewer and water mains,
culverts and drains that will serve the development whether on or off the property
along with the direction of existing and proposed surface water drainage across
the site.
2) The location, names, and present and proposed widths of existing and proposed
Article 6: Permit Review, Application Procedures and Standards
22
roads, driveways, streets, parking and loading areas, walkways and rights-of-
way within or adjacent to the proposed development.
3) The location and dimensions of all existing and proposed buildings and
structures on the site.
4) The location of intersecting roads or driveways within two hundred (200) feet of
the site.
5) The location of existing and proposed open drainage courses, wetlands, vernal
pools1, water bodies, streams, flood plains, stands of trees, vegetative cover
type, and other important natural features, with a description of such features to
be retained.
6) The location and dimensions of any existing and proposed easements.
7) The location and dimensions of all existing and proposed provisions for water
supply and wastewater disposal systems, including a design copy or letter of
soils suitability for any proposed new or replacement wastewater disposal
systems.
8) The location and dimensions of all existing and proposed signs.
9) For any project which shall result in a change to exterior lighting, the location,
height, and type of existing and proposed exterior lighting and, for commercial,
industrial and institutional projects, the foot-candle intensities of proposed
lighting projecting on abutting properties.
10) The proposed landscaping and buffers/screening.
11) The location and amount of any earth moving.
12) A copy of all existing or proposed covenants or deed restrictions associated with
the subject property.
j.
A copy of any applicable Federal, State or Town applications or permits which have been
issued.
k. A narrative describing how the proposal meets all of the Planning Board's Review
Criteria.
l.
Evidence of receipt of application fee, payable to the Town of Readfield.
m. A schedule of construction, including anticipated beginning and completion dates.
n. A stormwater drainage and erosion and control plan in compliance with Article 8,
Sections 10 and 11.
o. A description of the traffic movement to be generated by the development including
types, peak hour and average daily vehicle trips, travel routes, and duration of traffic
movement both during and following construction. A full traffic impact study shall be
required under the conditions set forth in Article 8, Section 18.H, and shall include the
components described therein.
p. An assessment of the solid or hazardous wastes to be generated by the proposed activity
and a plan for its handling and disposal, along with evidence of disposal arrangements.
q. The Planning Board may require existing and proposed topography of the site to be
mapped at ten (10) foot contour intervals, or such other intervals as the Planning Board
may determine necessary for review.
r. A copy of any required dimensional calculations applicable to the standards being
reviewed, for example, square footage of structures, percent of lot coverage, etc.
s. Elevation drawings for new commercial, industrial, and institutional buildings.
t.
Any additional information relevant to the project, for example, photographs, Cobbossee
Watershed District recommendations, etc.
G. Review Criteria
The applicant shall demonstrate that the proposed use meets the review criteria listed below as well
as all other applicable provisions of this Ordinance, including, but not limited to, applicable
performance requirements and standards (Article 8), road standards (Article 10) and applicable
Article 6: Permit Review, Application Procedures and Standards
23
appendices. The Planning Board shall approve the application unless it makes written findings that
one or more of the Ordinance requirements have not been met:
1.
Aesthetic, Cultural and Natural Values. The proposed activity shall not have an undue
adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites,
archeological sites, significant wildlife habitat identified or defined by the Department of
Inland Fisheries and Wildlife or the Town of Readfield, or rare plant and animal species,
critical habitat, significant or irreplaceable natural areas or resources identified by the
Department of Conservation, or any public rights for physical or visual access to the
shoreline.
2.
Conformity with Local Ordinances and Plans. The proposed activity shall conform with all
applicable Ordinances and the Comprehensive Plan.
3.
Erosion. The proposed activity shall not cause soil erosion or a reduction in the land's
capacity to hold water so that a dangerous or unhealthy condition results and to the extent
relevant and appropriate shall be consistent with the best management practices set forth in
the "Maine Erosion and Sediment Control Best Management Practices" (Maine Department
of Environmental Protection, October 2016, or as revised) and the "Maine Erosion and
Sediment Control Practices Field Guide for Contractors" Maine Department of
Environmental Protection, 2015 or as revised) or the most applicable best management
practices as referred to in Article 8, Section 8.
4.
Financial Burden on Town. The proposed activity shall not cause an unreasonable financial
burden on the Town for provisions of public services and facilities.
5.
Financial and Technical Capacity. The applicant shall have adequate financial resources and
technical capacity to construct and maintain the proposed improvements and meet the criteria
of all applicable Ordinances. In making the above determinations, the Planning Board shall
consider the proposed time frame for construction, the effects of inflation, the applicant's
previous experience, the experience and training of the applicant's consultants and
contractors, and the existence of any violations of previous approvals granted to the applicant
under the provisions of this Ordinance.
6.
Flood Areas. The proposed activity shall not adversely affect flood plain areas as depicted on
the Federal Emergency Management Agency's Flood Insurance Rate Maps and the proposal
shall conform with all applicable requirements of the Town of Readfield Floodplain
Management Ordinance.
7.
Wetlands. The proposed activity shall not have an adverse impact on wetlands.
8.
Groundwater. The proposed activity shall not, alone or in conjunction with existing
activities, adversely affect the quality or quantity of groundwater.
9.
Municipal Solid Waste Disposal. The proposed activity shall not cause a burden on the
Town's ability to dispose of solid waste, if municipal services are to be utilized.
10. Water Supply. The proposed activity shall not cause a burden on an existing public water
supply, if one is to be used.
11. Adjacent Land Uses. The proposed activity shall not have a detrimental effect on adjacent
land uses or other properties that might be affected by waste, noise, glare, fumes, smoke,
dust, odors or other effects.
Article 6: Permit Review, Application Procedures and Standards
24
12.
Pollution. The proposed activity shall not result in water or air pollution. In making this
determination, the Planning Board shall at a minimum consider:
a. The elevation of the land above sea level and its relation to the flood plains;
b.
The nature of soils and subsoils and their ability to adequately support waste disposal;
c.
The slope of the land and its effect on effluents, including phosphorous transport; and
d.
The applicable State and Town health, air and water resource and sludge rules and
regulations.
13.
Waterbodies. The proposed activity shall not have an undue impact on any waterbody such
as a lake, pond, or stream.
14.
Wastewater Disposal. The proposed activity shall provide for wastewater disposal meeting
all applicable requirements of the Maine Subsurface Wastewater Disposal Rules. For
proposed subdivisions, each lot must provide within that lot's proposed developed area at
least two suitable subsurface disposal system sites meeting first-time system requirements.
Form HHE-200, or its equivalent, shall be required.
15. Stormwater. The proposed activity shall adequately provide for effective stormwater
management, and to the extent relevant and appropriate shall be consistent with the best
management practices set forth in the "Maine Stormwater Best Management Practices
Manual (Department of Environmental Protection, March 2016 (Volumes I and II) and May
2016 (Volume III) or as revised).
16. Sufficient Water. The proposed activity shall have sufficient water available for the
reasonably foreseeable needs of the proposed development and no evidence of adverse
impact to the quality of that water from known or potential sources of contamination
including, but not limited to those identified and described in the Department of
Environmental Protection's "Environmental and Geographic Analysis Database" (EGAD).
For any groundwater contamination risks within 1,000 feet of the proposed activity, the
Planning Board may require test well analysis or other data as it deems appropriate be
submitted with the application or become a condition of approval.
17. Traffic. The proposed activity shall not cause highway or road congestion or unsafe
conditions with respect to the use of the highways or roads existing or proposed.
18.
Legal Access. The site shall have legal and reasonable means of access sufficient to meet all
proposed uses.
19. Impact on Adjoining Municipality. When a proposed development subject to site review
crosses the Town's boundaries, the proposed development shall not cause unreasonable
traffic congestion or unsafe conditions with respect to the use of existing public ways in an
adjoining municipality in which part of the development is located.
20. Life and Fire Safety. The Planning Board may require a review of any development subject to
site review by the Readfield Fire Department for life and fire safety recommendations and may
require incorporation of the life and fire safety recommendations in the application or as a
condition of approval of the application.
21. Violations. The proposed activity or development is not on property currently in violation of
any requirements of this Ordinance. If the Code Enforcement Officer determines that an
enforceable violation exists; the Code Enforcement Officer shall issue a written Notice of
Violation to the applicant within the review period of time provided for and the application, if
otherwise approved, shall be conditioned upon the resolution of the violation prior to the use
Article 6: Permit Review, Application Procedures and Standards
25
or occupancy of the permitted activity applied for. This provision shall not prohibit, restrict
or otherwise preclude the applicant from appealing to the Board of Appeals under this
Ordinance or the Board of Appeals Ordinance any determination by the Code Enforcement
Officer of an alleged violation.
22. Compliance with Timber Harvesting Standards. For proposed subdivisions, timber on a parcel
purchased on or after January 1, 2005 shall not have been harvested in violation of the Maine
Forest Service's Timber Harvesting Standards to Substantially Eliminate Liquidation
Harvesting within the five-year period preceding the submission of the application for
subdivision approval.
23. Road Construction. Proposed road construction applicable under Article 10, Section 2 must be
reviewed and approved by the Road Commissioner prior to final Site Review approval by the
Planning Board.
H. Revisions to Approved Plans
1.
An application for a revision to a previously approved plan, including a subdivision plan,
shall be submitted to the Code Enforcement Officer at least 14 days prior to a scheduled
meeting of the Planning Board. The Code Enforcement Officer with the approval of the
Planning Board shall place the application revision on the Planning Board's agenda. The
procedure for a new application shall be followed if the revision involves:
a) An expansion of a building , structure, or developed area is greater than 5% in area
or volume from the original plan;
b) Modifications to any condition imposed by the Planning Board;
c) The addition of units;
d) The addition of new lots;
e) A re-subdivision involving 2 or more lots, except for the reallocation of lot lines
among 3 or fewer lots when the Planning Board determines that such reallocation
will not result in the creation of additional lots or adverse impacts on the subject or
adjacent properties.;
f) A change or expansion of a use except for a change of use that is substantially
similar in nature to the approved use, and that the Planning Board determines, will
not result in increased or additional adverse impacts. Re-subdivisions are also
subject to the procedural standards of Article 8, Section 17.K.
2. If the revision involves only minor modifications of the plan, the Planning Board may consider
the request at the meeting. If, during the course of consideration the Planning Board
determines the revision may result in a greater adverse impact on a waterbody or wetland, or on
the subject or adjacent properties than the plan previously approved, the Board may require the
procedure for a new application be followed.
3. The Planning Board's scope of review shall be limited to those portions of the plan which are
proposed to be revised, or that are adversely impacted by the proposed revision.
4. The applicant shall submit a copy of the approved plan as well as 11 copies of the proposed
revisions. The application shall include enough supporting data to allow the Planning Board to
make a decision that the proposed revision meets the review criteria.
5. The Planning Board shall vote to approve the revision, deny the revision, or approve the
revision with conditions, or require the submission of a new site plan review application. The
Planning Board may further require additional information be submitted in order to ensure that
the review criteria are met.
Article 6: Permit Review, Application Procedures and Standards
26
I.
Application Procedure for Site Review
1.
All applications for site review shall follow the procedure outlined below:
a.
Site review application forms shall be obtained from the Town of Readfield.
b.
All site review applications shall be submitted to the Code Enforcement Officer. A dated
receipt shall be issued to the applicant upon payment of the appropriate fee. An
application file shall be established by the Code Enforcement Officer. All submissions
and correspondence regarding the application shall be maintained in the file. One
complete copy of the site review application and applicable submissions shall be
submitted to the Code Enforcement Officer for review.
c.
Within 30 days of the receipt of the site review application, the Code Enforcement
Officer shall make a preliminary determination whether the application is complete and
notify the applicant in writing of his/her decision. If the application is not complete, the
Code Enforcement Officer shall notify the applicant in writing of the specific material
needed to complete the application.
d.
The application shall be considered complete when all the site review submission
requirements are included or when the applicant files a written waiver request.
e.
The Code Enforcement Officer shall notify the Planning Board that a site review
application has been received and the Planning Board shall schedule a public hearing
within 30 days after it has made the final determination that the application is complete.
f.
A complete copy of the site review application shall be kept on file at the Town Office
and shall be available for public review.
g.
The applicant shall submit 11 copies of the complete application and applicable
submissions to the Code Enforcement Officer at least 14days prior to the next scheduled
planning board meeting. The Code Enforcement Officer shall mail or deliver one copy
of the application to each Planning Board member at least 7 days prior to the planning
board meeting.
h.
The Code Enforcement Officer shall publish a notice of the date, time, place, and
purpose of the public hearing in a newspaper of general circulation in the Town at least
10 days prior to the public hearing.
i.
The Code Enforcement Officer shall notify the applicant and all property abutters to the
proposed site at least 10 days prior to the public hearing. The notice shall include the
date, time, and place of the public hearing and a brief description of the proposal by
first class mail and a Certificate of Mailing as proof of mailing shall be obtained from
the postal clerk at the time of mailing and retained as a part of the official records of the
application. Compliance with these requirements satisfies the municipal abutter
notification requirements. Property abutters shall mean all property owners of any
parcel with one or more common boundaries or points as well as property owners of any
parcel located directly across any road or stream along the road or stream from the
parcel involved in application or appeal. Property owners shall mean all parties listed
by the Town Tax Assessor as those against whom taxes are assessed.
j.
Within 60 days of the public hearing the Planning Board shall make a decision on the
site review application.6.
k.
The deadline for making a final decision may be extended by the Planning Board for a
period not to exceed 60 days, under the following conditions:
1. The Planning Board voted to deny a waiver request.
2. The Planning Board voted to require additional studies be performed or required
additional information be submitted in order to meet the review criteria.
l. If the additional application materials or studies are not submitted to the Planning Board
within the additional prescribed time period, the Board shall vote to deny the application
or accept a request by the applicant to withdraw the application. The application may be
resubmitted to the Planning Board at a later date according to the requirements for a new
application.
Article 6: Permit Review, Application Procedures and Standards
27
m. The Code Enforcement Officer shall notify the Town Clerk and the Planning Board of
the neighboring towns if any portion of the application requires a site review that abuts
or crosses the town boundary. If any application for a site review crosses the town
boundary, the Planning Board shall follow the applicable procedure for conducting a
joint meeting as contained in Title 30-A M.R.S.A., Sections 4401-4407.
2.
The site review application shall consist of the following submissions:
a. Copy of the portion of applicable tax map showing subject property and abutting
properties.
b. Names and addresses of all property abutters of the proposed development.
c. Exact directions to the property from the Town Office, using a map if necessary.
d. Map showing boundaries of all contiguous property under the control of the owner or
applicant, regardless of whether all or part is being developed at this time.
e. The tax map and lot number of the parcel or parcels.
f. A copy of the deed to the property or other documentation to demonstrate right, title
or interest in the property on the part of the applicant.
g. The name, registration number and seal of the land surveyor, architect, engineer
and/or similar professional who prepared any plan.
h. Map showing the north bearing and lot dimensions of all property lines of the
property to be developed and the source of this information.
i.
Site plan(s) illustrating the following: (Note: If the site plan is not drawn to scale,
then specific distances identifying the relative locations of the following features
must be shown on the plan.)
1) The location and size of any existing and proposed sewer and water mains,
culverts and drains that will serve the development whether on or off the
property along with the direction of existing and proposed surface water
drainage across the site.
2) The location, names, and present and proposed widths of existing and
proposed roads, driveways, streets, parking and loading areas, walkways and
rights-of-way within or adjacent to the proposed development.
3) The location and dimensions of all existing and proposed buildings and
structures on the site.
4) The location of intersecting roads or driveways within two hundred (200)
feet of the site.
5) The location of existing and proposed open drainage courses, wetlands,
vernal pools1, water bodies, streams, flood plains, stands of trees, vegetative
cover type, and other important natural features, with a description of such
features to be retained.
1Vernal pools are temporary to semi-permanent pools occurring in shallow depressions that
usually contain water for only part of the year, filling during the fall and winter as the water
table rises and typically drying out by mid to late summer. Significant Vernal Pool habitat is
protected by law under the Natural Resource Protection Act, 38 MRSA, Section 480
6) The location and dimensions of any existing and proposed easements.
7) The location and dimensions of all existing and proposed provisions for
water supply and wastewater disposal systems, including a design copy or
letter of soils suitability for any proposed new or replacement wastewater
disposal systems.
8) The location and dimensions of all existing and proposed signs.
9) For any project which shall result in a change to exterior lighting, the
location, height, and type of existing and proposed exterior lighting and, for
commercial, industrial and institutional projects, the foot-candle intensities of
proposed lighting projecting on abutting properties.
10) The proposed landscaping and buffers/screening.
Article 6: Permit Review, Application Procedures and Standards
28
11) The location and amount of any earth moving.
12) A copy of all existing or proposed covenants or deed restrictions associated
with the subject property.
j.
A copy of any applicable Federal, State or Town applications or permits which have
been issued.
k. A narrative describing how the proposal meets all of the Planning Board's Review
Criteria.
l.
Evidence of receipt of application fee, payable to the Town of Readfield.
m. A schedule of construction, including anticipated beginning and completion dates.
n. A stormwater drainage and erosion and control plan in compliance with Article 8,
Sections 10 and 11.
o. A description of the traffic movement to be generated by the development including
types, peak hour and average daily vehicle trips, travel routes, and duration of traffic
movement both during and following construction. A full traffic impact study shall
be required under the conditions set forth in Article 8, Section 18.H, and shall include
the components described therein.
p. An assessment of the solid or hazardous wastes to be generated by the proposed
activity and a plan for its handling and disposal, along with evidence of disposal
arrangements.
q. The Planning Board may require existing and proposed topography of the site to be
mapped at ten (10) foot contour intervals, or such other intervals as the Planning
Board may determine necessary for review.
r. A copy of any required dimensional calculations applicable to the standards being
reviewed, for example, square footage of structures, percent of lot coverage, etc.
s. Elevation drawings for new commercial, industrial, and institutional buildings.
t.
Any additional information relevant to the project, for example, photographs,
Cobbossee Watershed District recommendations, etc.
J.
Application Procedures for Minor Subdivisions
1.
Sketch Plan Review
a. Purpose
The purpose of the sketch plan submittal is for the applicant to present general
information regarding the proposed subdivision to the Planning Board and to receive the
Planning Board's comments prior to the expenditure of substantial sums of money for
developing the subdivision plan.
b. Procedure
1) The applicant shall obtain a sketch plan review application from the Code
Enforcement Officer.
2) The applicant shall submit the complete sketch plan application to the Code
Enforcement Officer at least 10 days prior to a scheduled Planning Board
meeting. The Code Enforcement Officer shall place the sketch plan application
on the Planning Board's agenda for consideration with the approval of the
Planning Board.
3) The applicant shall present the sketch plan application to the Planning Board and
make a verbal presentation regarding the site and the proposed subdivision.
4) Following the applicant's presentation, the Planning Board may ask questions
and make suggestions to be incorporated by the applicant into the application.
5) The Planning Board may conduct a site visit or may decide to conduct a site visit
prior to any hearing and/or at any other time.
6) The applicant is not required to pay an application fee for the sketch plan
application.
Article 6: Permit Review, Application Procedures and Standards
29
7) The sketch plan application and on-site inspection, if conducted, shall not be
considered the initiation of the review process for the purposes of bringing the
plan under the protection of Title 1, M.R.S.A. Section 302.
8) The Planning Board shall determine the contour intervals to be shown on the
plan.
c. Submissions
The sketch plan application shall show in simple sketch form the proposed layout of
roads, lots, buildings, and other features in relation to existing site conditions. The
sketch plan does not have to be an engineered plan and may be a free-hand penciled
sketch.
The sketch plan shall be submitted on the application forms provided by the Town and
include the following:
1. A copy of the Tax Assessor's map of the site and surrounding area.
2. A copy of the U.S.G.S. topographic map of the area showing the outline of the
proposed subdivision.
3. A copy of the County Soil Survey showing the area of the proposed subdivision.
4. A copy of the Town Land Use Map showing the proposed subdivision.
2.
Preliminary Plan
a. Within 6 months after the sketch plan meeting, the applicant shall submit an application
for approval of a preliminary plan to the Code Enforcement Officer. Failure to submit a
preliminary plan within 6 months of the sketch plan meeting shall require resubmission
of the sketch plan to the Planning Board.
b. The Code Enforcement Officer shall issue a dated receipt to the applicant upon receiving
the subdivision application.
c. The Code Enforcement Officer shall notify by first class mail all property abutters of the
proposed subdivision that an application for a subdivision has been received by the
Town. The notice shall specify the location of the proposed subdivision, including a
general description of the project. The Code Enforcement Officer shall maintain a list of
all property abutters notified by first class mail in the application file.
d. The Code Enforcement Officer shall notify the Town Clerk and the Planning Board of
the neighboring town, if any portion of the subdivision abuts or crosses the town
boundary. If any subdivision crosses the town boundary the Planning Board shall follow
the applicable procedure for conducting a joint meeting as contained in Title 30-A
M.R.S.A., Sections 4401 - 4407.
e.
The Town shall keep a copy of the subdivision application at the Town Hall for public
review.
f. Within 30 days of receipt of the preliminary application the Code Enforcement Officer
shall make a preliminary determination of whether the application is complete and
notify the applicant in writing of his/her determination. If the application is not
complete, the Code Enforcement Officer shall notify the applicant of the specific
additional material needed to complete the application. The application shall be
considered complete when all the subdivision plan submissions requirements are
included or when the applicant files a waiver request.
g. The Code Enforcement Officer shall notify the Planning Board that a preliminary
subdivision application has been received and the Planning Board shall schedule a
public hearing within 30 days after it has made the final determination that the
application is complete.
h. The Code Enforcement Officer shall publish a notice of the date, time and place of the
hearing in a newspaper of general circulation in the Town at least 2 times, the first
publication to be at least 7 days prior to the hearing.
Article 6: Permit Review, Application Procedures and Standards
30
i. The Code Enforcement Officer shall notify by Certificate of Mailing the applicant and
all property abutters, as defined, at least 10 days prior to the public hearing. The notice
shall include the date, time, purpose and place of the hearing. Failure of any abutter to
receive said notification shall not invalidate any subsequent decision rendered by the
Planning Board.
j
The applicant shall submit 11 copies of the complete application and applicable
submissions to the Code Enforcement Officer at least 14 days prior to the public
hearing. The Code Enforcement Officer shall mail or deliver one copy of the application
to each Planning Board member at least 10 days prior to the public hearing.
k. Within 30 days of the public hearing or within another time period as may be otherwise
mutually agreed to by the Planning Board and the applicant, the Planning Board shall
make findings of fact on the application and approve, approve with conditions, or deny
the application.
l. The deadline for making the final decision may be extended by the Planning Board if a
mutual agreement between the Planning Board and the applicant is reached. The
Planning Board may also extend the deadline for a period not to exceed 60 days under
the following conditions:
1. The Planning Board voted to deny a waiver request.
2. The Planning Board voted to require additional studies be performed or required
additional information be submitted in order to meet the review criteria.
If the additional application materials or studies are not submitted to the Planning Board
within the additional prescribed time period, the Planning Board shall vote to deny the
application or accept a request by the applicant to withdraw the application. The
application may be resubmitted to the Planning Board at a later date according to the
requirements for a new application.
m. The Planning Board shall submit its final decision on the preliminary plan to the
applicant in writing. The approval of the preliminary plan shall not constitute approval
of the final plan or intent to approve the final plan, but rather it shall be deemed an
expression of approval of the design of the preliminary as a guide to preparation of the
final plan.
3.
Final Plan
a. The Planning Board shall not require a minor subdivision application to follow
additional application procedures for submittal of the final subdivision plan. After
approval of the Preliminary Plan the Planning Board shall sign the subdivision plan after
the plan has been re-titled as the Final Plan according to the following:
1. The applicant has modified the preliminary plan as necessary based upon the
final decision of the Planning Board.
2. All waivers, conditions of approval, and all deed covenants and restrictions shall
be listed on the Plan.
b.
If the plan is not ready for the Planning Board's signature as per the requirements listed
in sub-section a, above, after approval of the Planning Board, then the applicant shall
make the necessary modifications and present the complete final plan to the Planning
Board for their signature at the next scheduled Board meeting.
4.
The minor subdivision application shall consist of the following materials:
a.
The submission requirements for Site Review contained in Section I.2, items a
through g.
b.
The Subdivision Plan for a minor subdivision shall include one or more maps or
drawings drawn to a scale of not more than one hundred 100 feet to the inch, provided
all necessary detail can easily be read. Plans shall be no larger than 24 by 36 inches in
size.
Article 6: Permit Review, Application Procedures and Standards
31
c. The application for approval of a minor subdivision shall include the following
information:
1. Proposed name of the subdivision and the name of the municipality in which it is
located, the subdivision lot numbering system plus the Tax Assessor's Map and
Lot numbers.
2. A field survey of the perimeter of the tract, giving complete descriptive data by
bearing and distances, made and certified by a Registered Land Surveyor. The
corners of the tract shall be located on the ground and marked by permanent
markers. The plan shall indicate the type of permanent marker proposed to be set
or found at each lot corner.
3. A copy of the deed on which the survey was based. A copy of all covenants or
deed restrictions, easements, rights-of-way, or other encumbrances currently
affecting the property shall be included.
4. A copy of any covenants or deed restrictions or other encumbrances intended to
cover all or part of the lots in the subdivision.
5. The number of acres within the proposed subdivision, location of existing
property lines, buildings, and other essential physical features. The location of
any Essential or Significant Wildlife Habitat mapped by the Maine Department of
Inland Fisheries and Wildlife, or Rare or Exemplary Natural Communities or Rare
Plant Locations mapped by the Maine Department of Conservation shall also be
shown on the plan.
6. For subsurface wastewater disposal systems, test pit analyses prepared by a
licensed Site Evaluator and a map showing the location of all test pits dug on the
site. Form HHE 200 or its equivalent shall be supplied for the primary disposal
site for each lot.
7. Indication of the type of water system(s) to be used in the subdivision. When
water is to be supplied by a public water district or a private water association, a
written statement from the servicing water district or association shall be
submitted indicating there is adequate supply and pressure for the subdivision and
approving the plans for extensions, when necessary. Where the district's or
association's supply line is to be extended, a written statement from the Fire Chief,
stating approval of the location of fire hydrants, if any, shall be submitted. When
water is to be supplied by private wells, evidence of adequate ground water supply
and quality shall be submitted in the form of a written statement from a hydro
geologist or professional well driller familiar with the area.
8. The date the Plan was prepared, magnetic north point, graphic map scale, names
and addresses of the record owner(s), Applicant(s), and individual(s) or company
which prepared the plan.
9. A copy of that portion of the Kennebec County Soil Survey covering the
subdivision. When the medium intensity soil survey shows soils which are
generally unsuitable for the uses proposed, the Board may require the submittal of
a report by a registered soil scientist indicating the suitability of soil conditions for
those uses.
10. Contour lines at intervals of 5 feet or at such intervals as the Planning Board may
require, based on United States Geological Survey data and referenced to mean
sea level.
11. If any portion of the subdivision is in a flood-prone area, the boundaries of any
flood hazard areas in the 100-year flood elevation shall be delineated on the plan.
12. The approximate location of all principal structures on abutting properties within
300 feet of the subdivision.
13. The location of any zoning boundaries affecting the subdivision.
14. The location and size of existing and proposed sewers, water mains, culverts,
drainage ways and fire ponds on or adjacent to the property to be subdivided.
15. The location, names and present widths of existing and proposed streets,
Article 6: Permit Review, Application Procedures and Standards
32
highways, easements, rights-of-way, building lines, parks, recreation areas, open
space areas, pedestrian walkways, outdoor lighting, signs and parking areas on or
adjacent to the subdivision.
16. The width and location of any streets or public improvements shown upon the
Official Land Use Map and in the Comprehensive Plan, if any, within the
subdivision.
17. All proposed lot lines with approximate dimensions and lot areas.
18. All parcels of land proposed to be dedicated to public use and the conditions of
such dedication.
19. The location of any open space to be preserved and an explanation of its proposed
management.
20. The location of any sand and gravel aquifer as mapped by the Maine Geological
Survey underlying any part of the subdivision along with a hydrogeological
assessment prepared by a Certified Geologist experienced in hydrogeology
evaluating any potential impact to the aquifer which may result from the
development of the subdivision.
21. A narrative describing how the proposed subdivision meets the Planning Board's
Review Criteria.
22. Receipt of application fee, payable to the Town of Readfield.
23. A schedule of construction, including anticipated beginning and completion dates.
24. An erosion control plan in compliance with Article 8, Section 11.
25. A list of all other state and federal permits required for the subdivision.
26. Evidence that the applicant has the financial means, and has dedicated same, to
effect the completion of the subdivision. In addition, that the applicant, or agent
of applicant, have the experience requisite to complete the subdivision.
27. A narrative describing any timber harvesting operations within the preceding five
(5) years, a copy of the Forest Operations Notification and a written determination
of the harvest's compliance with the Maine Forest Service's Timber Harvesting
Standards to Substantially Eliminate Liquidation Harvesting certified by a
licensed forester shall be submitted.
28. A map showing any known groundwater risk areas within 1,000 of the proposed
development.
(Note: For submittal 28 (above), refer to the "Environmental and Geographic Analysis
Database (EGAD) at the Maine Department of Environmental Protection's website:
http://www.maine.gov/dep/gis/datamaps/ (under "All Bureaus" go to "Site Types," then
"Google Earth;" type in "Readfield" in the location bar (upper left corner), then use the
directory in the left column to identify and sort information).
K. Application Procedure for Major Subdivisions
1.
Sketch Plan review for major subdivisions shall follow subsection J, 1.
2.
Preliminary Plan application procedures for a major subdivision shall follow subsection J, 2
and J, 4.
3.
Preliminary Plan Submission Requirements for a Major Subdivision shall include all the
submission requirements for a Minor Subdivision and the following:
a.
A stormwater management plan for the disposal of surface drainage waters prepared by
a Registered Professional Engineer and if located in the watershed of Cobbossee Lake,
reviewed by the Cobbossee Watershed District. Such plan shall also include a
phosphorus transport analysis.
b.
A traffic impact analysis demonstrating the impact of the proposed project on the
Article 6: Permit Review, Application Procedures and Standards
33
capacity, level of service and safety of adjacent streets, utilizing recognized
professional standards.
c.
A visual impact assessment prepared by a registered landscape architect or other
qualified professional acceptable to the Planning Board, when the Board finds that a
subdivision is likely to have an effect on the scenic or natural beauty of the area.
d.
A description of all parcels of land proposed to be dedicated to public use and the
conditions of such dedication. Written offers of cession to the municipality of all public
open spaces shown on the Plan, and copies of agreements or other documents showing
the manner in which open spaces to be retained by the developer or lot owner are to be
maintained shall be submitted. If open space or other land is to be offered to the
municipality, written evidence that the Municipal Officers are satisfied with the legal
sufficiency of the written offer of cession shall be included.
e.
A list of construction items with cost estimates that will be completed by the developer
prior to the sale of lots.
f.
A list of construction and maintenance items, with both capital and annual operating
cost estimates that must be financed by the municipality, or quasi-municipal districts.
These lists shall include but not be limited to:
-
Schools, including busing
-
Street maintenance and snow removal
-
Police and Fire protection
-
Solid waste disposal
-
Recreational facilities
-
Stormwater drainage
-
Wastewater treatment
-
Water supply
g. The Applicant shall provide an estimate of the net increase in taxable assessed valuation
at the completion of the construction of the subdivision.
h. Engineered drawings showing the proposed name, location and construction
specifications for all proposed public or private roads.
4.
Final Plan Application Procedures for a Major Subdivision
a. Within 6 months of the date of the Planning Board approval of the preliminary plan, the
applicant shall submit a complete final subdivision plan application to the Code
Enforcement Officer. Failure to submit a final plan application within 6 months of
approval of the preliminary plan will require re-submission of the preliminary plan.
b. The Code Enforcement Officer shall issue a dated receipt to the applicant upon receiving
the application.
c. Within 30 days of receipt of the final plan application the Code Enforcement Officer shall
make a preliminary determination whether the application is complete and notify the
applicant in writing of his/her determination. If the application is not complete, the Code
Enforcement Officer shall notify the applicant of the specific material needed to complete
the application. The application shall be considered complete when all the submission
requirements are included or when the applicant files with the application a waiver
request.
d. The Code Enforcement Officer shall notify the Planning Board that a final subdivision
application has been received and the Planning Board shall make the final determination
that the application is complete. The Planning Board shall schedule within 30 days a
public hearing after it has determined that the application is complete.
e. The Planning Board shall hold a public hearing on the final plan application within 60
days after it has determined the final application is complete. The public hearing
notification requirements contained in subsection J.2 g-i shall be followed.
f. The applicant shall submit 11 copies of the complete application and applicable
submissions to the Code Enforcement Officer at least 14 days prior to the meeting or
Article 6: Permit Review, Application Procedures and Standards
34
public hearing. If the subdivision proposal includes the development of a new public or
private road, the applicant shall obtain approval from the Board of Selectmen for the
name of the road prior to the public hearing.
g. Within 30 days of the public hearing or 60 days of the meeting, the Planning Board shall
make a finding of fact on the application and approve, approve with conditions or deny
the application.
h. The Planning Board shall submit its final decision on the final plan to the applicant in
writing. If the Final plan is approved the Planning Board shall sign the plan and keep one
copy for the Town files.
i.
The final plan shall consist of 4 mylar copies containing all the necessary conditions,
modifications and waivers approved by the Planning Board. The applicant shall record
the approved final plan in the registry of deeds within 90 days of the date the Planning
Board signed the plan.
5.
Final Plan Submission Requirements
The final plan submission requirements shall include all those items required for a
preliminary plan and the following:
a. All conditions and modifications approved by the Planning Board for the preliminary
plan shall be contained in the final plan application.
b. All waivers approved by the Planning Board for the preliminary plan shall be shown on
the final plat.
c. The name, registration number, and embossed seal of the registered land surveyor who
prepared the plan shall be shown on the plat.
d. The street names and lines, lengths of all straight lines, the deflection of angles, radii,
length of curves, and central angles of all curves and tangent distances and bearings shall
be shown on the plat. On the roads, the applicant shall mark lines or dots on the plan in
the center of the roads every 50 (fifty) feet to aid in the assignment of road numbers to
structures subsequently constructed.
e. The designation of all easements, areas reserved for, or dedicated to, public use or the
common use of lot owners, and areas reserved by the developer.
f. The location, bearing and length of every lot line, with all lots numbered.
g. The location of permanent markers set at all lot corners.
h. A performance guarantee to secure completion of all public improvements if required by
the Planning Board and written evidence that the Municipal Officers are satisfied with the
legal sufficiency of such guarantee.
i.
Written copies of any documents of land dedication, and written evidence that the
Municipal Officials are satisfied with the legal sufficiency of any documents
accomplishing such land dedication.
j.
The flood hazard boundaries and floodplain elevations for any portion of the subdivision
that is within the 100-year floodplain as shown on the Town of Readfield Flood
Insurance Rate Maps. If any development is proposed to be located within the 100-year
floodplain, the plan shall include a condition of plan approval requiring all applicable
provisions of the Floodplain Management for the Town of Readfield be complied with
before, during, and subsequent to any development.
k. A signature block shall be provided on the final plan.
L.
Performance Guarantees
1.
Improvements Guarantee. Performance Guarantees shall be tendered for all improvements
required by the Planning Board, including the construction of the streets (the "required
improvements").
Article 6: Permit Review, Application Procedures and Standards
35
2.
Types of Guarantees. As required by the Planning Board, the developer shall provide a
Performance Guarantee, that may be one of the following listed Performance Guarantees, or
such other Performance Guarantee as determined by the Planning Board, and be in an amount
adequate to cover the total construction costs of all required improvements and/or for projects
with a defined life cycle, the costs of removing such improvements:
a. An escrow account funded by cash or a certified check payable to the Town of
Readfield and governed by an escrow agreement provided by the applicant in a form
acceptable to the Planning Board. The escrow agreement shall include, at a
minimum, the following terms:
The consent of the municipal officers shall be required for a withdrawal, but the
consent of the developer shall not be required for a withdrawal. Any interest earned
on the escrow account shall be returned to the developer upon completion of the
required improvements unless the Town has found it necessary to draw on the
account, in which case the interest earned shall be proportionately divided between
the amount returned to the developer and the amount withdrawn to complete the
required improvements. The escrow account shall be maintained by the Town
Treasurer in the name of the Town. Portions of the escrowed funds may be released
as required improvements are completed and releases are authorized by the Planning
Board under paragraph 5 below.
b. An irrevocable letter of credit from a bank or other financial institution authorized to
do business in Maine securing funding for the construction of on which the Town
may draw if construction is inadequate, or incomplete.
c. For development projects with an anticipated completion date of less than six (6)
months, the developer may provide the Town Treasurer with a bank treasurer's
check in the required escrow amount to be held by the town in lieu of establishing an
escrow account, in which case no interest will be earned or is payable.
The form, time periods, conditions and amount of the Performance Guarantee shall be
determined by the Planning Board. The Planning Board may seek advice from the Town's
Road Commissioner, Municipal Officers, and any consultants deemed appropriate by the
Planning Board including, but not limited to, the Town's engineer and attorney as to the form
and amount of the Guarantee. Any costs or fees incurred by the Town for such advice shall
be paid by the developer and the amount shall be included in determining the amount of the
Guarantee.
Upon receipt of a Performance Guarantee, the Planning Board or its designee shall notify in
writing the Town Manager and the Chairman of the Board of Selectmen of the terms of the
proposed acceptance of the Performance Guarantee, such notice provided so as to give the
Town Manager and the Chairman of the Board of Selectmen sufficient time to comment
before the Planning Board accepts the Performance Guarantee.
3.
Contents of Guarantee. The Performance Guarantee shall contain or incorporate by reference
a construction schedule, total cost estimates for each major phase of construction taking into
account inflation for the time span of construction, provisions for inspection of each phase of
construction, provisions for the release of part or all of the Performance Guarantee to the
developer, and a date after which the developer shall be in default and the Town shall have
access to the funds to finish construction.
4.
Phasing of Development. The Planning Board may approve plans to develop a Major
Subdivision in separate and distinct phases. This may be accomplished by limiting final
Article 6: Permit Review, Application Procedures and Standards
36
approval to those lots abutting that section of the proposed development street which is
covered by a Performance Guarantee. When development is phased, road construction shall
commence from an existing public way. Final approval of lots in subsequent phases shall be
given only upon satisfactory completion of all requirements pertaining to previous phases.
5.
Release of Guarantee. Prior to the release of any part of the Performance Guarantee, the
Code Enforcement Officer shall determine to its satisfaction, in part upon the inspection(s)
and/or report of the Town's Road Commissioner or a qualified engineer or other consultant
retained by the Town and whatever other agencies and departments may be involved, that the
proposed improvements shall meet or exceed the design and construction requirements for
that portion of the improvements for which the release is requested. All direct costs incurred
under this paragraph shall be paid by the developer.
6.
Default. If, upon inspection, the Code Enforcement Officer finds that any of the required
improvements have not been constructed in accordance with the Plans and specifications filed
as part of the application, the Code Enforcement Officer shall so report in writing to the
Board of Selectmen, the Planning Board, and the developer. The Board of Selectmen shall
retain the authority to take any steps necessary to preserve the Town's rights. Any work
which has not been completed in full compliance with the terms and conditions of the
Performance Guarantee may be performed at the direction of the Board of Selectmen and
such work shall be paid for from the Performance Guarantee funds in accordance with a
disbursement schedule recommended by the Planning Board.
Article 7 Land Use Districts and Regulations
37
ARTICLE 7
LAND USE DISTRICTS AND REGULATIONS
SECTION 1.
ESTABLISHMENT OF DISTRICTS
To implement the provisions of this Ordinance, the Town of Readfield is hereby divided into the
following Land Use Districts and Overlay District which are depicted on the official Readfield Land Use
Map.
A.
Land Use Districts
1. Village District
2. Village Residential District
3. Rural District
4. Rural Residential District
5. Shoreland Residential District
6. Resource Protection District
7. Stream Protection District
8. Commercial and Industrial District
B.
Overlay District
Mobile Home Park District
SECTION 2.
LOCATION OF DISTRICTS
Said districts are located and bounded as shown on the official Land Use Map, entitled "Land Use Map of
Readfield, Maine," and on file in the Town Office. The official map shall be signed by the Town Clerk
and the Chairman of the Planning Board at the time of adoption or amendment of this Ordinance
certifying the date of such adoption or amendment.
SECTION 3.
INTERPRETATION OF DISTRICT BOUNDARIES
A.
District boundary lines as set forth on the official Land Use map described in Section 2 and unless
otherwise indicated shall be property lines, the centerline of roads or rights-of-way, and the
boundaries of the shoreland districts as described below in Section 4.5, 4.6 and 4.7. The Code
Enforcement Officer, to the extent not set forth in the official Land Use map referred to above or as
necessary to clarify same, shall determine the boundaries of districts by conducting on-site
inspections and measurements of the distances as described in this Ordinance or displayed on the
Official Land Use Map or the Flood Insurance Rate Map. The Code Enforcement Officer may,
when necessary to make these determinations, use other available information including, but not
limited to: right-of-way maps, subdivision plans, surveys, and the Town of Readfield Road
Inventory and USGS Topography maps.
B. The depiction of all land use districts on the Official Land Use Map for the Town of Readfield is
merely illustrative of their general location. Where uncertainties exist as to exact location of
district boundary lines, the Board of Appeals shall be the final authority as to location.
C.
Lots Split by a Land Use District Line. If a lot is divided by two or more districts, the requirements
of this Ordinance for a particular district apply only to that PART of the lot which is located in
THAT district.
SECTION 4.
DISTRICT PURPOSES
A.
Land Use Districts
All of the districts described below seek to guide and direct development so that it shall not conflict
with the best interests of the Town in regard to protection of the environment, public health, safety,
flood damage prevention, and economic well-being.
Article 7 Land Use Districts and Regulations
38
1.
Village District
The village district is comprised of areas that can support a range of land uses including
higher density residential use, commercial, community and governmental facilities and light
industry. The district designation is intended to promote a compact (rather than sprawling)
pattern of development in the district areas, and to encourage the preservation, revitalization
and expansion of Readfield's two village areas (Readfield Corner and Readfield Depot). The
village district designation strives to accommodate the denser, mixed land use pattern
described above while seeking to maintain the character and historical integrity of the village
areas, and to ensure that proposed development and land uses are compatible with existing
uses in the village.
2.
Village Residential District
The village residential district includes areas where the primary use is for higher density
residential neighborhoods. Non-residential uses are strictly limited in this district. The
designation encourages a more compact pattern of residential development, and seeks to
ensure that the existing character and visual quality of the village residential areas are
maintained.
3.
Rural District
The rural district includes areas which contain a large acreage of open space, farmland and
forest land. Lands within the district are especially important for the recreational, scenic, and
other resource based opportunities which they offer. The purpose of the rural district
designation is to ensure that proposed development and land uses are compatible with the
preservation of Readfield's open, rural character and are protective of sensitive natural
resources and visual/scenic quality. In part, this is accomplished through encouraging
agriculture and forestry uses in the rural district. The rural district also accommodates certain
commercial and light industry uses and strives to maintain a development pattern of mixed,
low density use while protecting critical natural and scenic resources.
4.
Rural Residential District
The Rural Residential District is comprised of land areas similar in nature to those in the rural
district, in terms of their composition (substantial areas of open space, farmland and forest
land) and their value with respect to recreational, scenic and other resource based
opportunities. This district however, is more restrictive in terms of allowable uses, and
primarily seeks to accommodate low density residential use, agriculture and forestry
operations which are compatible with the preservation of Readfield's rural character, and
which are protective of sensitive natural resources and scenic/visual quality.
5.
Shoreland Residential District
The Shoreland Residential District includes all shoreland areas within 250 feet, horizontal
distance, of the normal high-water mark of a great pond or the upland edge of a wetland
consisting of ten (10) or more contiguous acres or as otherwise defined, other than those areas
included in the Resource Protection District or the Stream Protection District. It includes
areas that are appropriate for residential, recreational, and other non-intensive development
activities.
6.
Resource Protection District
The resource protection district includes areas having current moderate or high habitat value
and in which development would adversely affect water quality, productive fish or wildlife
habitat, biotic systems, or scenic and natural values. However, areas which are currently
developed and which would meet the criteria of this district shall be placed in another suitable
land use district. This district shall include the following areas.
Article 7 Land Use Districts and Regulations
39
a. Wetlands, as defined, and the areas within 250 feet horizontal distance of the upland
edge of the following wetlands: a wetland that is 10 acres or greater; wetlands
associated with great ponds; and, wetlands which are rated "moderate" or "high" value
by the Maine Department of Inland Fisheries and Wildlife.
b.
The wetlands and the areas within 25 feet horizontal distance of the upland edge of
wetlands that are greater than 2 acres and less than 10 acres.
c. Areas within 1000 feet horizontal distance of the normal high-water line of Carlton
Pond.
d.
Areas within 250 feet horizontal distance of the normal high-water line of Mill Pond,
Shedd Pond and Brainard Pond.
e.
Areas of 1 or more contiguous acres with sustained slopes of 20% or greater.
f.
The following areas when they are located within 250 feet horizontal distance of the
normal high-water line of a great pond; within 250 feet of the upland edge of a wetland;
and, within 75 feet, horizontal distance, of a stream:
(1) Important Wildlife habitat.
(2) Natural sites of significant scenic or aesthetic value.
(3) Areas designated by federal, state and local government as natural areas of
significance to be protected from development.
(4) Existing areas of public access and certain significant archeological and historic
sites.
7.
Stream Protection District
The Stream Protection District includes all land areas within 75 feet, horizontal distance, of
the normal high-water line of a stream as defined in Article 11 and other streams of local
significance designated on the Official Land Use Map, exclusive of those areas within 250
feet, horizontal distance, of the normal high-water line of a great pond, or within 250 feet,
horizontal distance of the upland edge of a freshwater wetland. Where a stream and its 75
foot shoreland area is located within the 250-foot shoreland area of a great pond or a
freshwater wetland, that land area shall be regulated under the terms of the district in which
the great pond or wetland are located.
8.
Commercial and Industrial District
The Commercial and Industrial District is established for the purpose of allowing the
opportunity for large scale commercial, industrial, or infrastructure uses to locate or expand
in the community if this can be accomplished with minimal negative impact, although large
scale commercial operations are generally not in keeping with the Town's character. This
district is the only district which may accommodate commercial industrial or infrastructure
uses with structures in excess of 5,000 square feet. This Ordinance seeks to ensure that
proposed uses are compatible with existing uses and the rural character of the Town, and are
protective of natural resources and visual quality. Land proposed for designation as
commercial/industrial/infrastructure shall follow the adoption procedures in Article 9.
9. Academic District
The Academic District is comprised of land areas that support development of educational
institutions and effective delivery of their programs and activities including housing, health
care, and food services. The purpose of this designation is to ensure a homogeneous pattern
of development on land now occupied by educational institutions focused exclusively on
accommodation of the institution's development needs and excluding unrelated residential,
commercial and industrial uses. In the Academic District, only uses which directly support or
relate to the principal permitted academic use shall be permitted.
Article 7 Land Use Districts and Regulations
40
B.
Overlay District
Mobile Home Park District
The Mobile Home Park District may accommodate mobile home parks and developments
where designated on the Town of Readfield Land Use Map, subject to the requirements of the
underlying district.
SECTION 5.
LAND USES
Land Uses permitted in Readfield are shown on Table 1 (Table of Uses) by the type of review required or
not required within each land use District under this Ordinance. Required permit review shall be secured
prior to obtaining the appropriate building, plumbing or other applicable construction permits in
accordance with the procedures and processes described in this Ordinance.
For any land uses not specifically identified in Table 1, the following type of review required or not
required within each land use district shall apply: The Code Enforcement Officer shall make the final
determination on the appropriate review for any land use not listed.
1. Uses similar to uses requiring a permit from the CEO and/or LPI shall require a permit from
the CEO and/or LPI
2. Uses similar to uses requiring Planning Board approval shall require Planning Board
approval.
3. Uses similar to allowed uses are permitted.
4. Uses similar to prohibited uses are prohibited.
Article 7 Land Use Districts and Regulations
41
TABLE 1 /
TABLE OF USES
LAND USE DISTRICT
Overlay
District
V
VR
AD9
R
RR
SR
RP
SP
CID
MH
RESIDENTIAL--including driveways
Accessory Structure
(to allowed uses)
C
C
C
C
C
C/P 11
P
N
P
C
Multi-Family Dwelling
P
P
P
N
P
P
N
N
N
P
Single-Family Dwelling
C
C
C
C
C
C/P 11
P5
C6
N
C
Two-Family Dwelling
C8
C8
C8
C
C
C/P 11
N
N
N
C
Rooming/Boarding House
Group Home
P
P
P
P
P
N
N
N
N
P
Mobile Homes
N
N
N
C
N
C/P 11
P5
C6
N
C
Mobile Home Park
N
N
N
N
N
N
N
N
N
P
Subdivisions
P
P
P
P
P
P
P5
P
N
P
Conversion of Seasonal
Homes7
C
C
C
C
C
C/P 11
P
P
N
C
Accessory Dwelling Unit
C
C
C
C
C
C/P 11
N
N
C
C
3COMMERCIAL
Principal and Accessory
Structures
P
N
N
P
N
N
N
N
P
U
Restaurants/Bars
P
N
N
P
N
N
N
N
P
U
Adult Entertainment
N
N
N
N
N
N
N
N
P
N
Recreation
P
N
P
P
N
P
N
N
P
U
Auto Sales/Repair Body
Shop
P
N
N
P
N
N
N
N
P
U
Bed and Breakfast
P
P
N
P
P
P
N
N
N
U
Car Wash
P
N
N
N
N
N
N
N
P
U
Gasoline Service Station
P
N
N
N
N
N
N
N
P
U
Home Occupations
C
C
C
C
C
C
C
C
C
C
Legend
Land Use Districts
Overlay District
V = Village District
R = Rural District
SP = Stream Protection
MH = Mobile Home
VR = Village Residential
RR = Rural Residential
RP = Resource Protection
AD= Academic District
SR = Shoreland Residential
CID = Commercial Industrial
Key to Table of Uses
Y =
Allowed Use (no permit required, but the use must comply with all applicable federal, state and local standards and
regulations, including but not limited to this Ordinance).
C =
Use requires review and permit from Code Enforcement Officer (CEO) and/or Local Plumbing Inspector (LPI).
P =
Use requires site review from Planning Board, and requires a permit from the CEO and LPI upon Planning Board approval.
N =
Prohibited Use
U =
Use shall comply with underlying District requirements.
N/A =
Not applicable to the district.
Article 7 Land Use Districts and Regulations
42
TABLE 1 /
TABLE OF USES
LAND USE DISTRICTS
Overlay
District
V
VR
AD9
R
RR
SR
RP
SP
CID
MH
Hotel/Motel
P
N
N
P
N
N
N
N
P
U
Indoor Theater
P
N
P
P
N
N
N
N
P
U
Office: Business
Professional/Medical
P
N
P
P
N
N
N
N
P
U
Printing/Photography
P
N
N
P
N
N
N
N
P
U
Redemption Centers
P
N
N
P
N
N
N
N
P
U
Retail Fuel Distributor
(Petroleum Prod.)
P
N
N
P
N
N
N
N
P
U
Retail Business
P
N
P
P
N
N
N
N
P
U
Veterinary Hospital
P
N
N
P
N
N
N
N
P
U
Service Business
P
N
P
P
N
N
N
N
P
U
Wholesale Business
P
N
N
P
N
N
N
N
P
U
Junkyard/Automobile
Graveyard/Automobile
Recycling
N
N
N
P
N
N
N
N
P
U
INDUSTRIAL3
Accessory Structure
P
N
N
P
N
N
N
N
P
U
Light Industry
P
N
N
N
N
N
N
N
P
U
Heavy Industry
N
N
N
N
N
N
N
N
P
U
Recycling Operation
P
N
N
P
N
N
N
N
P
U
Sludge Spreading
N
N
N
P
N
N
N
N
N
N
Terminal for Bulk Oil &
Gas
P
N
N
P
N
N
N
N
P
U
Trucking, including
Distribution Terminal
P
N
N
P
N
N
N
N
P
U
Warehousing and Storage
P
N
N
P
N
N
N
N
P
U
Legend
Land Use Districts
Overlay District
V = Village District
R = Rural District
SP = Stream Protection
MH = Mobile Home
VR = Village Residential
RR = Rural Residential
RP = Resource Protection
AD = Academic District
SR = Shoreland Residential
CID = Commercial Industrial
Key to Table of Uses
Y =
Allowed Use (no permit required, but the use must comply with all applicable federal, state and local standards and
regulations, including but not limited to this Ordinance).
C =
Use requires review and permit from Code Enforcement Officer (CEO) and/or Local Plumbing Inspector (LPI).
P =
Use requires site review from Planning Board, and requires a permit from the CEO and LPI upon Planning Board approval.
N =
Prohibited Use
U =
Use shall comply with underlying District requirements.
N/A =
Not applicable to the district.
Article 7 Land Use Districts and Regulations
43
TABLE 1 /
TABLE OF USES
LAND USE DISTRICTS
Overlay
District
V
VR
AD9
R
RR
SR
RP
SP
CID
MH
Waste Handling Facility
N
N
N
N
N
N
N
N
P
N
INSTITUTIONAL
Accessory Structure
C
C
C
C
C
N
N
N
N
U
Church/Synagogue/Parish
House
P
P
P
P
P
N
N
N
N
U
Civic/Convention Center
P
N
P
P
N
N
N
N
N
U
Community Centers/
Clubs
P
N
P
P
P
N
N
N
N
U
Community Living
Arrangement
up to 8 persons
more than 8 persons
C
P
C
P
C
P
C
P
C
P
C
P
P5
N
C6
N
N
N
C
U
Day Care Facilities
3 to 12+
P
P
P
P
P
P
N
N
P
U
Nursing Home
P
N
N
P
N
N
N
N
P
N
Hospital/Medical Care
P
N
P
P
N
N
N
N
N
U
Government Uses
P
P
P
P
P
N
N
N
N
P
Museum/Library
P
N
P
P
N
N
N
N
N
U
Public/Private School
P
P
P
P
P
P
N
N
N
U
Legend
Land Use Districts
Overlay District
V = Village District
R = Rural District
SP = Stream Protection
MH = Mobile Home
VR = Village Residential
RR = Rural Residential
RP = Resource Protection
AD = Academic District
SR = Shoreland Residential
CID = Commercial Industrial
Key to Table of Uses
Y =
Allowed Use (no permit required, but the use must comply with all applicable federal, state and local standards and
regulations, including but not limited to this Ordinance).
C =
Use requires review and permit from Code Enforcement Officer (CEO) and/or Local Plumbing Inspector (LPI).
P =
Use requires site review from Planning Board, and requires a permit from the CEO and LPI upon Planning Board approval.
N =
Prohibited Use
U =
Use shall comply with underlying District requirements.
N/A =
Not applicable to the district.
Article 7 Land Use Districts and Regulations
44
TABLE 1 /
TABLE OF USES
Legend
Land Use Districts
Overlay District
V = Village District
R = Rural District
RP = Resource Protection
MH = Mobile Home
VR = Village Residential
RR = Rural Residential
SP = Stream Protection
AD= Academic District
SR = Shoreland Residential
CID = Commercial Industrial
Key to Table of Uses
Y =
Allowed Use (no permit required, but the use must comply with all applicable federal, state and local standards and regulations, including
but not limited to this Ordinance).
C =
Use requires review and permit from Code Enforcement Officer (CEO) and/or Local Plumbing Inspector (LPI).
P =
Use requires site review from Planning Board, and requires a permit from the CEO and LPI upon Planning Board approval.
N =
Prohibited Use
U =
N/A=
Use shall comply with underlying District requirements.
Not Applicable to the district
LAND USE DISTRICTS
Overlay
District
V
VR
AD9
R
RR
SR
RP
SP
CID
MH
OUTDOOR, RESOURCE-
BASED USES
Accessory Structure
C
C
C
C
C
C
P
P1
N
U
Agriculture 12, 13
Y
Y
Y
Y
Y
Y1
P
Y1
Y
U
Agriculture-Light Industry 14
P
P
P
P
P
P
P
N
P
U
Agriculture-Intensive 15
P
P
P
P
P
P
N
N
P
U
Individual Campsites
Y
Y
C
Y
Y
C
C
C
N
U
Campground
N
N
N
P4
N
P
N4
N
N
U
Natural Resource-Based
Industries
N
N
N
P
P
N
N
N
P
U
Natural Resource-Based
Recreation
P
N
P
P
P
P
P
P
N
U
Kennels
N
N
N
P
N
N
N
N
N
N
Parks/Recreation
P
P
P
P
P
P
P
P
N
U
Piers and Docks
- Temporary
- Permanent
NA
NA
NA
NA
C
N
NA
NA
NA
NA
Y
N
Y
N
Y
N
N
N
NA
NA
Common Shoreland
Accesses
NA
NA
NA
NA
NA
PB
PB
PB
N
NA
Mining & Mineral
Extracting1
N
N
N
P
P
P
P
N
N
N
Filling or Other Earth
Moving
-
Less than 10 cy1
-
More than 10 cy1
Y
Y
Y
Y
Y
C
Y
Y
Y
Y
Y
C
C
P
C
P
Y
Y
U
U
Forest management &
Timber Harvesting
Y
Y
Y
Y
Y
Y1
C
Y
Y
U
Article 7: Land Use Districts and Regulations
45
TABLE 1 / TABLE OF USES
LAND USE DISTRICTS
Overlay
District
V
VR
AD
R
RR
SR
RP
SP
CID
MH
INFRASTRUCTURE
Essential Services
C10
C10
C10
C10
C10
P/C16
P/C16
P/C16
C10
N
Communications Tower
P
N
P
P
N
N
N
N
P
U
Wind Energy Systems
A. Commercial
B. Small
N
P
N
P
N
P
N
P
N
P
N
P
N
P
N
P
P
P
N
P
Municipal Waste Handling
Facility
P
N
N
P
N
N
N
N
P
N
Parking Areas
C
C
C
C
C
P
N4
N
C
C
Roads, Public & Private
P
P
P
P
P
P
P2
P
P
P
Signs
C
C
C
C
C
C
C
C
C
C
Legend
Land Use Districts
Overlay District
V = Village District
R = Rural District
SP = Stream Protection
MH = Mobile Home
VR = Village Residential
RR = Rural Residential
RP = Resource Protection
AD = Academic District
SR = Shoreland Residential
CID = Commercial Industrial
Key to Table of Uses
Y =
Allowed Use (no permit required, but the use must comply with all applicable federal, state and local standards and regulations,
including but not limited to this Ordinance).
C =
Use requires review and permit from Code Enforcement Officer (CEO) and/or Local Plumbing Inspector (LPI).
P =
Use requires site review from Planning Board, and requires a permit from the CEO and LPI upon Planning Board approval.
N =
Prohibited Use
U =
Use shall comply with underlying District requirements.
N/A =
Not applicable to the district.
1.
Subject to the applicable standards and conditions contained in Article 8, Sections 11, 19B, 19F and 23.
2.
These uses are not allowed within those districts except to provide access to permitted uses within the district, or
where no reasonable alternative route or location is available outside the district, in which case a permit shall be
required from the Planning Board.
3.
Structures for Commercial and Industrial uses allowed in the Village, Village Residential, Rural, Shoreland
Residential, Stream Protection, and Resource Protection Districts shall not be greater than 5,000 square feet in total
floor area. Structures for Commercial and Industrial uses allowed in the Commercial and Industrial District may be
greater than 5,000 sq. ft. in area.
4. Except when area is zoned Resource Protection due to floodplain criteria, in which case a permit is required from
the Planning Board.
5.
Single family dwellings may be allowed by special exception only according to the provisions of Article 8, Section
19. N
6. Provided that a variance from the setback requirement is obtained from the Board of Appeals.
Article 7 Land Use Districts and Regulations
46
7. See Article 8, section 27, "Seasonal Conversions of Residential Dwellings."
8. See Article 8, section 1.C. for conversions or reconstruction of single- and two-family structures on nonconforming
lots in the V, VR or AD.
9. In the Academic District, only uses which directly support or relate to the principal permitted academic use shall be
permitted.
10. Major Essential Service development projects are subject to Site Plan Review by the Planning Board as determined
by the Code Enforcement Officer.
11.
Planning Board approval required for allowed uses within the restricted setback of a protected resource.
12.
"Agriculture" that also meets the definition of "Agriculture - Light Industry" shall be subject to the provisions of
the LUO applicable to "Agriculture - Light Industry".
13.
"Agriculture" that also meets the definition of "Agriculture - Intensive" shall be subject to the provisions of the
LUO applicable to "Agriculture - Intensive".
14.
"Agriculture - Light Industry" that also meets the definition of "Agriculture - Intensive" shall be subject to the
provisions of the LUO applicable to "Agriculture - Intensive".
15.
Planning Board approval is required for a newly established Agriculture - Intensive use, for expansions of use
meeting the definition of "agriculture - intensive", and for expansions of existing agricultural use that cause the use
to meet the definition of "agriculture - intensive".
16.
"Small Cell Facilities are permitted by the Code Enforcement Officer"
Article 7 Land Use Districts and Regulations
47
SECTION 6. SPACE STANDARDS AND DIMENSIONAL REQUIREMENTS
Unless otherwise permitted by this Ordinance, all lots, structures and uses must meet the minimum
standards and requirements as set forth in Table 2. If more than one dwelling unit or other
principal structure or use, or combination thereof, is constructed or established on a single lot, all
dimensional requirements for land area and frontage shall be met for each additional dwelling unit,
principal structure or use. Any lots created that are of less compliance with the following table shall
not be eligible for building or use permits as they are required by this Ordinance.
TABLE 2 Dimensional Requirements
LAND USE DISTRICTS
Overlay
District8
Dimensions
V
VR
AD
R
RR
SR
RP12
SP
CID
MH
Minimum land area 14,
17 (sq. ft. in thousands)
20' 18
40' 19
40' 19
80' 20
80' 20
80' 20
80' 20
80' 20
80'
80 12, 20
Minimum Road
Frontage (public or
private)14
100'
100'
100'
200'
200'
200'
200'
200'
200'
200'
Road setback 1, 6
25/5013
25/50'
25/50
50/75'
50/75'
25/50'
50/75'
50/75'
50/75'
50/75'
Side setback 6, 11, 14
20'13
20'
20'
20'
20'
20'
20'
20'
20'
20'
Rear setback 6, 14
20'13
20'
20'
20'
20'
20'
20'
20'
20'
20'
Water Body setback 10
100'
100'
100'
100'
100'
100'
250'
75'
100'
NA
Tributary Stream
setback 6, 7,
50'
50'
75'
75'
75'
75'
75'
75'
50'
NA
Wetland setback-
greater than 2 acres,
less than 10 acres 6
25'
25'
25'
25'
25'
25'
25'
25'
25'
25'
Wetland setback-10
acres or more, or 2 or
more acres adjacent to
surface waterbody 6
75'
75'
75'
75'
75'
75'
75'
75'
75'
75'
Minimum lot depth
200'
200'
200'
200'
200'
200'
200'
200'
200'
200'
Maximum lot depth to
frontage ratio 9
5:1
5:1
5:1
5:1
5:1
5:1
5:1
5:1
NA
NA
Maximum lot
coverage 15
NA
NA
NA
NA
NA
20%
20%
20%
NA
NA
Minimum shore3
frontage
NA
NA
NA
NA
NA
200'
200'
200'
200'
NA
Maximum height of
structure 4, 5
35'
35'
35'
35'
35'
3516
3516
3516
35'
35'
1.
In the Village and Village Residential Districts, road setback shall be from the edge of the right-of-way of a public
or private road or from the centerline of the road, whichever is less. For all other Districts front setback shall be from
the edge of the right-of-way of a public or private road or from the centerline of the road, whichever is greater.
2. Minimum land area for Mobile Home Park.
3. Land uses classified as commercial, industrial or institutional shall have a minimum of 300 feet of shore frontage.
Article 7 Land Use Districts and Regulations
48
4. Structures in compliance with the Telecommunication Towers Ordinance and agricultural structures not within a
Shoreland District and not used as dwellings are exempt provided height shall not at any time place structures or
potential structures on adjacent lots in jeopardy should exempt or extended structures collapse for any reason or
cause.
5. Any increase in the height of a structure above that which is permitted in this Ordinance requires a variance from the
Board of Appeals.
6. Steps, stairways, ramps or similar structures may be allowed within the required setback area with a permit from
the Code Enforcement Officer as may be necessary to provide for a secondary means of egress from a legally
existing dwelling, provided: the structure is limited to a maximum of four (4) feet in width, and that the applicant
demonstrates there is no reasonable alternative means of escape from the dwelling. The Code Enforcement Officer
may impose conditions to any approval as necessary to insure conformance with the purposes and provisions of the
setback requirements of this Ordinance to the greatest practical extent.
7. Within the Village or Village Residential Districts or Commercial Industrial Districts, the 50 ft. setback requirement
may be reduced to not less than 25 ft. provided the applicant has submitted a stormwater management and erosion
control plan prepared by a qualified professional clearly demonstrating the following: (a) the on-site treatment of
peak discharge rates of stormwater and erosion control utilizing the design principles set forth in Article 8, Sections
10 and 11; (b) the implementation for the stormwater treatment and erosion control plan; and (c) the approval for
this setback reduction is a written part of the permit.
8. Must conform to requirements of underlying district.
9. This provision applicable to all lots created after September 15, 2004. When a lot borders both a waterbody and a
road, the lot depth to frontage ratio shall be based on the frontage of the waterbody.
10. Water-dependent structures, such as docks, are not subject to Waterbody or wetland setbacks but remain subject to
all other setback requirements for structures in the District in which they are located, except as allowed by the
Planning Board under Article 8, Section 19.N
11. Side setbacks are not applicable where only a common wall separates the individual ownership of units in a multi-
unit structure.
12. In the Resource Protection District the setback requirement shall be 250 ft., horizontal distance, from all water
bodies, except for structures, roads, parking spaces or other regulated objects specifically allowed in that district, in
which case the setback requirements specified in Table 2 Dimensional Requirements shall apply.
13. In the Village District, setbacks may be reduced by up to five (5) feet for accessory structures, provided there is no
alternative location that meets setbacks to the greatest practical extent, as determined by the Code Enforcement
Officer applying the standards set forth in Article 3, Section 4.E.1. This exception does not apply to accessory
structures to be used as dwelling units.
14. For single-lot divisions or conventional subdivision development. The Planning Board may approve reductions in
dimensional standards for cluster development described in Article 8, section 21.
15. Except for cluster development (see Article 8, section 21).
16 Article 3, Section 4, NON-CONFORMING STRUCTURES shall be applied to structures that do not meet the water
body or wetland setbacks.
17. Except for affordable housing developments as defined in Title 30-A, MRSA §4364, which are eligible for a density
bonus (refer to Article 8, Section F).
18. The minimum lot size (20,000 square feet) is for the first dwelling unit, with each additional dwelling unit (other
than an accessory dwelling unit) requiring an additional 20,000 square feet.
19. The minimum lot size (40,000 square feet) is for the first dwelling unit, with each additional dwelling unit (other
than an accessory dwelling unit) requiring an additional 40,000 square feet.
20. The minimum lot size (80,000 square feet) is for the first dwelling unit, with each additional dwelling unit (other
than an accessory dwelling unit) requiring an additional 80,000 square feet,
Article 8 Performance, Requirements and Standards
49
ARTICLE 8
PERFORMANCE REQUIREMENTS & STANDARDS
The following standards shall apply to all lots created and all land use activities undertaken, where
applicable, in addition to all other state and federal requirements:
SECTION 1. DWELLING UNITS
A. Single-Family Dwellings
A single-family dwelling unit may be constructed or established on a parcel provided it meets
the minimum standards and requirements set forth in Article 7 Table 2 and all other applicable
requirements of this Ordinance.
B. Two-Family Dwellings: New and Conversions
Except as prohibited in the shoreland districts pursuant to Article 8, Section 1.C.4, a single, two
family dwelling (such as a duplex or an in-law apartment) may be constructed on one lot
meeting the minimum dimensional requirements for lot size and frontage provided all
requirements of the Maine Subsurface Wastewater Disposal Rules are met. Notwithstanding
this provision, a second dwelling unit shall be counted toward the number of lots defining a
subdivision.
A minimum of two on-site parking spaces shall be provided for each dwelling unit.
C. Conversion or Reconstruction to Two- or Multi-Family on Nonconforming Lots
If the conversion or reconstruction of an existing single- or two-family structure on a
nonconforming lot into a two- or multi-family dwelling is proposed, the Planning Board may
approve such change of use if the structure is located within the Village, Village Residential or
Academic Districts and meets the criteria for Site Review and the following requirements:
1. The conversion meets the dimensional requirements for Cluster Developments
described in Article 8, Section 21.D.2, a-f;
2. The converted dwelling meets all requirements of the Maine Subsurface Wastewater
Disposal Rules;
3. There are no deed restrictions prohibiting the conversion;
4. The lot is not part of a subdivision;
5. The conversion does not result in the creation of any additional driveway entrance onto
a public road;
6. Adequate on-site parking areas shall be provided for a minimum of two vehicles for
each dwelling unit that shall be set back from adjacent property lines to the greatest
extent practical. Buffers shall be provided of such height and density as necessary to
sufficiently buffer/screen (as defined) the parking area from adjacent land uses;
7. Any change in the structure shall be consistent with the character of the neighborhood;
and,
Article 8 Performance, Requirements and Standards
50
8. Conversions or reconstructions in the Academic District shall be permitted only to
support and accommodate the district's institutional housing needs for the delivery of
their programs.
NOTE: The dimensional requirements (referenced in 1. above) may be increased or
decreased by the Planning Board by a factor of 10% if it finds such change is necessary in
order to ensure good site development design for accommodating greater densities in these
districts.
D. Multi-Family Dwellings
Except where permitted under Article 8, Section 21 (Cluster Development):
1. Each multi-family dwelling shall contain no more than four dwelling units and is subject
to applicable provisions of Section 1(E) below.
2. A minimum of two on-site parking spaces shall be provided for each dwelling unit. For
affordable housing development projects, refer to Article 8, Section 1.F.for the
applicable parking requirements.
3. The minimum lot size for a multi-family dwelling shall be the product of the number of
dwelling units in the building times the Town's minimum lot size requirements for a
single-family residence for the district in which the multi-family dwelling is located.
4. Each multi-family dwelling unit shall meet the greater of the following setback
requirements: 50 feet from the side and rear lot lines, or 100 feet from any adjacent
dwelling.
E. Multiple Dwelling Units Allowed**
In accordance with Title 30-A, MRSA Section 4364-A, up to 3 dwelling units are allowed on
lots where residential uses are allowed, and up to 4 dwelling units are allowed on such lots if
they are located in designated future growth areas as identified in the current Town of
Readfield Comprehensive Plan or subsequent revisions of the Plan, provided that each dwelling
unit meets the minimum land area and other dimensional requirements of Article 7 Section 6,
and all other applicable requirements of this Ordinance.
F. Affordable Housing Development and Dwelling Unit Density Bonus**
In accordance with Title 30-A, MRSA Section 4364, affordable housing developments (as
defined in Article 11) are eligible for a density bonus of 2.5 times the number of dwelling units
allowed for a development not designated as affordable and are not required to provide more
than 2 off-street parking spaces for every 3 dwelling units, provided the following criteria are
met:
1. The development shall be located in the designated future growth areas as identified in
the current Town of Readfield Comprehensive Plan, or subsequent revisions of the
Plan, or the development must be served by a public, special district or other centrally
managed water system, and a public, special district, or other comparable sewer
system.
2. The owner of an affordable housing development shall execute a restrictive covenant
that is enforceable by a party acceptable to the Town of Readfield, and shall record the
covenant in the Kennebec County Registry of Deeds, to ensure that for at least 30 years
Article 8 Performance, Requirements and Standards
51
after completion of construction:
a. For rental housing, occupancy of all the units designated affordable in the
development will remain limited to households at or below 80% of the local
area median income, as defined by the U.S. Department of Housing & Urban
Development, at the time of initial occupancy; and
b. For owned housing, occupancy of all the units designated affordable in the
development will remain limited to households at or below 120% of the local
area median income, as defined by the U.S. Department of Housing & Urban
Development, at the time of initial occupancy.
**Denotes that the standards set forth in Article 8, Section 20 (Subdivision) may apply in
addition to the subsection's standards, dependent on the proposed development activity.
G. Accessory Dwelling Units
1. Accessory dwelling units are prohibited within the Resource Protection and Stream
Protection Districts.
2. Notwithstanding the minimum land area requirements set forth in Article 7 Table 2
(Dimensional Requirements) of this Ordinance, in districts other than Resource
Protection and Stream Protection Zoning Districts, one accessory dwelling unit is
allowed to be located on the same lot where a single-family dwelling unit is the
principal structure, provided the following standards and criteria are met:
a. Accessory dwelling units may be constructed/located only:
i.
Within an existing dwelling on the lot;
ii. Attached to or sharing a wall with a single-family dwelling unit; or
iii. As a new structure on a lot for the primary purpose of creating an accessory
dwelling unit.
b. The single-family dwelling and accessory dwelling units must be owned by
the same person and may not be sold separately.
c. Accessory dwelling units may not be offered as "short-term rental units" as
defined in 30-A MRSA Section 4364-C(2).
d. The accessory dwelling unit shall contain a minimum floor area of 190 square
feet and a maximum floor area of 700 square feet.
e. Except as provided in G.2.f below, accessory dwelling units are allowed on
legal, non-conforming lots of record provided they meet all relevant
requirements and standards set forth in Article 3 (Non- Conformance) of this
Ordinance and do not result in an increase in nonconformity.
f.
Accessory dwelling units must comply with the dimensional requirements of
Article 7 Table 2 as they relate to structures, except that the "minimum land
area" and "maximum lot coverage" requirements do not apply. For accessory
dwelling units located within or attached to a single-family dwelling or within
an existing accessory structure or secondary building (e.g., a garage),
dimensional requirements (except for "minimum land area" and "maximum lot
coverage") are the same as for the single-family dwelling, accessory structure
or secondary building. Except as otherwise provided in this section, the
Article 8 Performance, Requirements and Standards
52
construction or establishment of accessory dwelling units may not cause any
increase in nonconformity with applicable provisions of this Ordinance.
g. Proper ingress and egress shall be provided to/from the accessory dwelling
unit.
h. The applicant shall provide written verification that a proposed accessory
dwelling unit will be connected to an adequate supply of potable water and to a
wastewater disposal system found by the Code Enforcement Officer to be in
compliance with applicable requirements of the Maine Subsurface Wastewater
Disposal Rules, and to be adequate for this purpose. The Code Enforcement
Officer may require outside expert review and documentation at the applicant's
expense if there is evidence that the proposed potable water supply and/or
wastewater disposal system are not adequate to serve the accessory dwelling
unit.
i. The applicant shall comply with all other applicable provisions of this
Ordinance, and other local and State Ordinances and codes, including, but not
limited to, those related to building, plumbing, electrical and fire safety, in
effect at the time that the accessory dwelling unit is proposed.
j. Only one (1) accessory dwelling unit is allowed per lot.
k. No use, dimensional or other variances shall be granted for the
construction/establishment of an accessory dwelling unit.
H.
Mobile Homes
1. Mobile Homes Outside of a Mobile Home Park
Mobile homes and modular home units placed on individual lots outside of a mobile
home park shall meet the same requirements for a single-family dwelling unit in the
district in which it is located. Additionally, mobile homes shall be considered a
permitted use in all districts where single-family homes are allowed. Campers and
recreational vehicles are not considered mobile homes and, therefore, must follow the
regulations pertaining to them.
2. Temporary Use of Mobile Homes
Mobile homes may be allowed in any district a single-family home is allowed, subject
to all setback requirements, while the occupants are constructing a conventional
dwelling on that same lot and upon the granting of a permit from Code Enforcement
Office. This permit shall be valid for a period of nine months and which may be re-
issued for a second nine month period if circumstances warrant.
3. Skirting
Each mobile home shall have skirting installed and maintained and shall contain at least
one access panel.
4. Installation Standards
All units shall be installed in accordance with the "Manufactured Home Installation
Standard" as adopted by the State of Maine, Department of Professional and Financial
Article 8 Performance, Requirements and Standards
53
Regulation, Manufactured Housing Board.
5. Safety Standards for Older Mobile Homes
These standards shall apply to all mobile homes built before June 15, 1976, or not built
according to the National Manufacturing Housing Construction and Safety Standards
Act of 1974, United States Code, Title 42, Chapter 70, to be located on an individual
lot or in a mobile home park in the Town of Readfield.
a. Exit Facilities - Exterior Door:
i.
Required egress doors shall not be located where a lockable interior door
must be used in order to exit.
ii. Homes shall have a minimum of 2 exterior doors not less than 12 feet from
each other as measured in any straight line direction regardless of the length
of the travel between doors. One of the required exit doors shall be
accessible from the doorway of each bedroom without traveling more than
35 feet.
iii. All exterior swinging doors shall provide a minimum 28 inches wide by 74
inches high clear opening. All exterior sliding glass doors shall provide a
minimum 28 inches wide by 72 inches high clear opening. Locks shall not
require the use of a key for operation from the inside.
b. Exit Facilities - Egress Windows and Devices:
i.
Every room designed for sleeping purposes, unless it has an exit door, shall
have at least one outside window or approved exit device. If an exit
window or device is installed, it shall be listed in accordance with
procedures and requirements of AAMA 1704-1985.
ii. The bottom of the exit window opening shall not be more than 36 inches
above the floor.
iii. Locks, latches, operating handles, tabs and any other window screen or
storm window devices, which need to be operated in order to permit egress,
shall not be located in excess of 54 inches from the finished floor.
c. Interior Doors:
Each interior door, when provided with a privacy lock, shall have a privacy
lock that has an emergency release on the outside to permit entry when the lock
has been locked by a locking knob, lever, button or other locking devices on the
inside.
d. Fire Detection Equipment:
At least one smoke detector shall be installed in the home in the following
locations:
i.
A smoke detector shall be installed on any wall in the hallway or space
communicating with each bedroom area between the living area and the
first bedroom door unless a door separates the living area from the
bedroom area, in which case the detector shall be installed in the living
area side as close to the door as practical. Homes having bedroom areas
separated by any one or combination of communication areas such as
kitchen, dining room, living room or family room (but not a bathroom or
Article 8 Performance, Requirements and Standards
54
utility room) shall have at least one detector protecting each bedroom area.
ii. When located in hallways, the detector shall be between the return air
intake and the living area.
iii. The smoke detector shall not be placed in a location which impairs its
effectiveness.
iv. Smoke detectors shall be labeled as conforming with the requirements of
Underwriters laboratory Standards No. 217, Third Edition, 1985, as
amended through October 8, 1985, for single and multiple station smoke
detectors.
v. Each smoke detector shall be hardwired and installed in accordance with its
listing.
e. Flame Spread:
i.
Ceiling interior finish shall not have a flame spread rating exceeding 75.
ii. Walls and ceilings adjacent to or enclosing a furnace or water heater shall
have an interior finish with a flame spread rating not exceeding 25.
iii. Exposed interior finishes adjacent to the cooking range shall have a flame
spread rating not exceeding 50.
iv. Kitchen cabinet doors; countertops; back splashes; finish surfaces of plastic
bathtubs, shower units, and tub and shower doors, shall not have a flame
spread rating not to exceed 200.
v. No burner of a surface-cooking unit shall be closer than 12 horizontal
inches to a window or an exterior door.
f.
Kitchen Cabinet Protectors:
i.
The bottom and sides of combustible kitchen cabinets over cooking ranges
to a horizontal distance of 6 inches from the outside edge of the cooking
range shall be protected with at least 5/8 inch thick gypsum board or
equivalent limited combustible material. The cabinet area over the cooking
range or cooktop shall be protected by a metal hood with not less than a 3
inch eyebrow projecting horizontally from the front cabinet face. The
gypsum board which is above the top of the hood may be supported by the
hood. A 3/8 inch enclosed air space shall be provided between the bottom
surface of the cabinet and the gypsum board. The hood shall be at least
wide as the cooking range.
ii. The metal hood shall not be required if there is an oven installed between
the cabinet and the range.
iii. Ranges shall have a vertical clearance above the cooking top of not less
than 24 inches to the bottom of combustible cabinets.
g. Carpeting:
Carpeting shall not be used in a space or compartment designed to contain only
a furnace or water heater.
h. Roof and Wind Loads:
All homes with roofs added after construction shall require a professional
engineer to inspect the roof to certify that the roof is designed and constructed
for a snow load of 30 pounds per square foot and a wind load of 15 pounds per
square foot.
Article 8 Performance, Requirements and Standards
55
i.
Heating and Fuel Burning System:
A person holding a master license issued by the State of Maine Oil and Solid
Fuel Examining Board shall inspect and certify that the heating system and fuel
system meets the requirements of NFPA 31, "Installation of Oil Burning
Equipment", as adopted by that State of Maine.
j.
Electrical System:
A master electrician licensed in the State of Maine shall inspect and certify that
the electrical system is safe and meets the National Electrical Code in effect at
the time the home was constructed.
SECTION 2.
LOTS
A.
Lot Divisions
If any land is subdivided, conveyed, divided or reduced in dimension or otherwise transferred
in violation of this Ordinance, no building or other land use permit shall be issued with
reference to any of the land or lots so reduced or created until all such dimensional
requirements at the time of adoption or amendment of this Ordinance are met, except as
provided with Planning Board approval in Article 3, Section 3.A.1, of this Ordinance.
B.
Contiguous lots, tracts or parcels of land in the same ownership and located on opposite sides
of a public or private road are considered each a separate lot, tract or parcel of land unless
such road was established by the owner of land on both sides thereof after September 22,
1971.
C. Rear Lots
Notwithstanding the road frontage requirements of this Ordinance, rear lots may be built
upon provided all state and federal requirements and the following provisions are met:
1.
The area of the rear lot shall be at least the minimum required in the district in which
the lot is located.
2.
The total road frontage of the front lot, less the width of the access, shall continue to
equal or exceed the minimum required in the district. Where the access bisects the
front lot line, the lot frontage on either side of the access may be combined to meet this
requirement, and the front lot shall continue to be treated as a single, undivided lot.
3.
The access to the rear lot, as defined, may serve not more than two rear lots, as defined,
or not more than two single-family dwellings or one two-family dwelling.
4. No more than one access for rear lot development may be created out of any single lot
fronting on a public or privately owned road unless each subsequent access is created
out of at least an additional road frontage as required for that district, as measured from
the centerline of the accesses.
5.
No structures shall be constructed or placed within the limits of the access.
6.
A copy of the recorded access shall be attached to the building permit.
7.
The rear lot shall not be required to have frontage on the access.
8.
The provisions of this section may not create an exempt lot or otherwise excuse or
exempt a parcel or tract of land from any review of a subdivision otherwise required by
this Ordinance.
9.
Rear lots, together with any right-of-ways serving those rear lots, created and legally
recorded on or before the date of adoption of this provision (June 11, 1998) shall be
considered legally non-conforming lots and rights-of-ways of record and may be used
in accordance with all other provisions of this Ordinance.
Article 8 Performance, Requirements and Standards
56
10.
Access to a rear lot shall provide for a permanent easement for a right-of-way or fee
simple ownership of an access right-of-way, which is at least 30' feet in width,
described by metes and bounds, or by a plan, and recorded in the Kennebec County
Registry of Deeds, and held by deed or other legal instrument.
SECTION 3.
SANITARY AND WATER QUALITY STANDARDS
A. Conformance with State of Maine Subsurface Wastewater Disposal Rules
All subsurface sewage disposal facilities shall be installed, maintained and/or replaced in
conformance with the State of Maine Subsurface Wastewater Disposal Rules, and the
following: (a) clearing or removal of woody vegetation necessary to site a first-time system
and any associated fill extensions, shall not extend closer than seventy-five (75) feet,
horizontal distance, from the normal high-water line of a waterbody or the upland edge of a
wetland, and (b) a holding tank is not allowed for first-time residential use in the shoreland
districts.
B. Subsurface Wastewater Disposal for Lots of Less than 80,000 Square Feet
If new development requiring a first-time subsurface wastewater disposal system is proposed
on a lot of less than 80,000 square feet in area, the applicant shall submit proof that a
minimum of two suitable subsurface wastewater disposal areas are available on the site.
C.
Prohibited Activities
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant, including but not limited to nutrients, heavy metals, carcinogens or pathogens, that,
by itself or in combination with other activities or substances may impair designated uses or
the water classification of any water body, or ground water, or cause nuisances, such as
objectionable shore deposits, floating or submerged debris, oil or scum, color, odor, taste, or
be harmful to human, animal, plant or aquatic life, or give rise to erosion.
D.
Stormwater Management Plans
1. All new and expanded development in the Stream Protection, Resource Protection, and
Shoreland Residential District shall maintain an acceptable level of phosphorus loading
resulting from stormwater runoff to the adjacent water body by assuring that runoff shall be
retained or adequately treated on-site. A proposed stormwater management plan shall be
submitted by the applicant for review as part of the submission requirements with a permit
application to the Planning Board or Code Enforcement Officer.
2. The Cobbossee Watershed District staff may be consulted by the Code Enforcement
Officer or Planning Board to review each stormwater plan and make recommendations to the
applicant and suggest conditions to the Code Enforcement Officer or Planning Board
concerning the management of the site to promote the preservation of water quality. The
Code Enforcement Officer and/or the Planning Board shall review these recommendations in
determining whether to approve or deny any permit application for any new or expanded
development in the above-mentioned Districts. Any costs associated with such review shall
be paid by the applicant.
E.
Septic Inspections Required at Time of Title Transfer of Property Located in the Shoreland
District.
1. Prior to the title transfer of ownership of a lot or parcel located in the Shoreland District
containing a Subsurface Wastewater Disposal (SSWD) system or a structure connected to
Article 8 Performance, Requirements and Standards
57
a SSWD system, a person certified by the state shall be hired, not at public expense, to
inspect the SSWD system. If the inspection finds that the SSWD system is
malfunctioning, the system must be repaired or replaced within one year after transfer and
a structure connected to the SSWD system shall not be occupied until the system has
been brought into conformance with the Rules A full copy of the inspection results
required or a statement of exception(s) claimed, is required and shall be provided to the
Town Code Enforcement Officer prior to transfer closing. The indications of a
malfunctioning system are those specified in "system, malfunctioning" as provided in the
definition section of 10-144, Chapter 241, the State of Maine Subsurface Wastewater
Disposal Rules (Rules).
2. The following are the only exceptions allowed to the requirements of this paragraph:
a. When a SSWD system has been installed pursuant to rules adopted under
Title 22 M.R.S.section 42, and Title 30-A M.R.S. subsection 4211, within 3
years prior to the date of the transfer of property title.
b. When the current property owner provides to the purchaser and to the Code
Enforcement Officer (CEO) a written report from a person certified by the
state to inspect the SSWD that was performed within 3 years prior to the date
of transfer that certifies that the system was not found to be malfunctioning.
c. When weather conditions preclude an inspection of the SSWD by a person
certified by the state prior to the date of transfer, then an inspection is to be
performed within 9 months following the date of transfer. If the inspection
finds the system to be malfunctioning, the system must be replaced or
repaired.
d. When the person acquiring title to the lot containing an SSWD system or a
structure connected to a SSWD certifies to the Town Code Enforcement
Officer (CEO) that the system will be replaced with one installed pursuant to
Title 22 M.R.S. section 42, and Title 30-A M.R.S. subsection 4211, within
one year from the date of transfer.
3. The present title holder may not transfer, sell or offer to transfer or sell any lot
containing a SSWD system or structure connected to a SSWD system without
advising the prospective new title holder of the requirements of this article.
4. Any person who violates this subsection is subject to the civil penalties provision of
Article 2(D), except that the minimum, penalty for such violation is $500.
5. For the purposes of this section the term, "Transfer" shall include the
following: any transfer of ownership whether by sale, gift, devise, transfer to an
entity, and inheritance, including transfers to a trust or estate for which the
current owner is the beneficiary.
SECTION 4. HOME OCCUPATIONS
A.
Purpose
The Town recognizes that home occupations, when managed conscientiously and with respect for
the neighborhoods in which they are located, offer financial and social benefits to both the
proprietors and the community when these occupations blend imperceptibly with their
neighborhood character and without adverse impact resulting from any nuisance or other impacts
Article 8 Performance, Requirements and Standards
58
resulting from a change in traffic, noise, lighting, waste, environmental degradation, exterior
appearances, or otherwise become a burden to the neighborhood or its infrastructure.
B.
Definition
A Home Occupation is a commercial activity which results in a product or service intended for
financial gain conducted in whole or in part on the same premises where the owner of the
occupation resides. A home occupation is small in scale, is carried on primarily in a dwelling unit
or structure accessory to a dwelling unit by a member of the family residing there, and the activity
is and remains clearly incidental and secondary to the primary use of the premises as a residence.
Examples of the types of permitted home occupations include, but are not limited to: home offices
open to the public, workshops, personal services, internet/mail order sales, tutoring, artist/sculptor,
hairdresser/barber, direct sales product distribution (Amway, Avon, etc.), arts and crafts and
assembly of the same.
Hobbies or recreational activities of a noncommercial nature, agriculture and forest management
activities, and garage sales operated for less than 14 days total in a calendar year, are not
considered home occupations requiring a permit.
A home occupation does not result in the exterior of the principal dwelling, or any accessory
structure, or the lot on which such activity occurs to differ from nor alter the residential or other
predominant character of the neighborhood, or conflict with the purpose of District in which it is
located, as described in Article 7 Section 4 of the Ordinance.
If a commercial activity is not within this definition of "home occupation" and/or the following
standards are not met, then such activities are subject to Site Review by the Planning Board as
prescribed in Article 6.
C.
Home Occupation Permits
The granting of a home occupation permit does not run with the land; that is, it is a permit subject
to renewal annually and is non-transferrable. The permit a Code Enforcement Officer may issue
initially is renewed automatically except that, the Code Enforcement Officer or the Select Board
may determine, at any time, that the permit may not be renewed or continued for violations of this
Ordinance, or the terms or conditions of the permit, or for any other good cause, subject to
adequate notice and rights to appeal, as set forth in Article 2 of this Ordinance. A home occupation
permit is non-transferrable to another property or to a new property owner and upon termination of
the permitee's residency; the home occupation permit shall become null and void.
Any abutter or any other aggrieved party with standing may appeal the issuance or renewal of a
home occupation permit.
Any home occupations legally existing on the date of adoption of this Ordinance shall be exempt
from the requirements of this section unless the activity or the impact of such activity is
substantially changed or expanded in size or use in which case, the home occupation must comply
with the provisions of this Ordinance.
D.
Standards
All home occupations shall comply with the following standards, as well as all other applicable
provisions of this Ordinance:
1. All parking used by both the residence and the home occupation must be on-site. No on-street
parking is allowed.
Article 8 Performance, Requirements and Standards
59
2. There shall be no measurable increase in pedestrian or vehicular traffic to the property, including
delivery trucks in excess over normal traffic in the neighborhood.
3. The home occupation shall not cause the exterior appearance of the dwelling or any accessory
structure to be altered in a manner that would cause the residence to differ in appearance from its
residential character by any means including colors, lights or sounds, except that, one (1) non-
illuminated sign up to six (6) square feet in area is permitted if it complies with applicable
requirements of Article 8, section 14 of this Ordinance, notwithstanding those outdoor signs
permitted under Article 8, section 14.D.13. A sign exceeding six (6) square feet in area may be
allowed in some districts as described in Article 8, section 14.F.
4. There shall be no exterior lighting beyond that which is normally used by a residence.
5. The home occupation may not generate or produce any waste discharge, offensive noise,
vibration, smoke, dust, air or water pollution, odors, heat, glare, radiation, fumes, electrical
interferences or any other nuisances which are detectable beyond the boundaries of the lot and of
any greater or more frequent in extent than normally experienced in an average residential
occupancy wherein no home occupation exists.
6. Every applicant for a home occupation permit must identify and disclose the types, amounts,
means and frequency of the disposal of all waste or wastewater, or chemicals or other hazardous
materials used or generated by the home occupation, beyond what is typical to the common
residential use of the applicant's dwelling. A written plan for the proposed storage, use, and/or
disposal of all such substances shall be submitted to the Code Enforcement Officer and approved
by all appropriate Town, state, or federal authorities. If disposal of any waste is off site, written
authorization from the receiving facility or property owner shall be required.
7. On lots of less than 40,000 square feet in area, or within any shoreland district, all home
occupation activities including any storage of business inventory or equipment, or customer
property awaiting service or repair, must be conducted wholly within the principle dwelling or a
fully enclosed accessory building. On lots exceeding 40,000 square feet and located within the
Village, Village Residential, and Rural Residential Districts, the total outside storage area for the
home occupation activity permitted must not exceed 400 square feet in area. In the Rural District,
outside storage for the home occupation may be permitted up to one-percent (1%) of the total lot
area provided the neighborhood character and appearance is not adversely impacted. In all
districts, outdoor storage must meet all setback requirements for structures, and must be fully
screened from view of any public or private way and any abutting property. Use of a motor vehicle
or mobile home parked on the lot to store any goods is prohibited.
8. No home occupation activity shall be conducted in a manner inconsistent with the residential or
predominant character of its neighborhood environment, nor conducted in a manner that interferes
with the peace, quiet, enjoyment, health and welfare of any residential environment, nor shall the
exterior of any structures or the lot be constructed or altered to differ from a residential appearance.
9. Home occupations must not adversely affect any natural resource or environmentally sensitive
area, including but not limited to a wetland, waterbody, or aquifer. The occupation shall not use
chemicals or quantities of chemicals not commonly found or used in a residence.
10. Kennels and Animal Hospitals are not permitted as home occupations and must obtain Site
Review approval as a commercial business from the Planning Board.
11. Home occupations must be operated by the resident of the property and no more than one
nonresident employee at any time shall be allowed.
Article 8 Performance, Requirements and Standards
60
12. No home occupation shall be expanded upon an adjacent, separately described and recorded lot
other than the lot where the principal residence and home occupation are located.
SECTION 5.
DAY CARE FACILITIES
The following are minimum standards for all Day Care service facilities, as defined:
A. A barrier fence or other material shall be required of sufficient height to buffer outdoor
recreational areas from adjacent properties, roads, watercourses, lakes or ponds, or
other potentially hazardous areas, unless the area can be determined to be well
protected by location and natural barriers.
B. Fencing and screening shall be located within the applicant's property line sufficient to
allow for maintenance of both sides without intruding on abutting properties.
C. Fencing and screening shall be maintained in safe, neat, and sanitary condition.
D.
Hours of operation for facilities shall be limited from 6 a.m. to 8 p.m.
E.
One off-street parking area shall be provided for each staff member.
F.
A safe parking and turnaround area shall be provided for loading and unloading clients
and shall include adequate down-directional lighting during any hours of operation
between official sunset and sunrise.
G.
Year-round convenient and safe emergency vehicle access shall be provided to all
principal structures at all times. The facility owner/operator shall obtain review of their
proposal by the Readfield Fire Department to determine if the proposed plans provide
for the adequate year-round emergency access.
H.
The applicant shall provide written confirmation from the licensed Plumbing Inspector
or a Licensed Site Evaluator that any existing subsurface wastewater disposal system is
not malfunctioning and meets or has the ability to meet requirements of the State of
Maine Subsurface Waste Water Disposal Rules.
I.
The facility shall provide for safe and sanitary storage, removal and disposal of solid
waste generated on-site. The outdoor storage of solid waste shall be containerized and
screened from ordinary view.
J.
Adult day care facilities which provide services for more than two (2) clients who are
not blood relatives shall require licensing from the Department of Human Services in
compliance with the "Regulations Governing the Licensing and Functioning of Adult
Day Services Programs".
SECTION 6.
FLOOD DAMAGE PREVENTION
All development activities including but not limited to the construction or substantial
improvement of structures; installation of subsurface wastewater disposal systems and water
supply facilities; or dredging, filling, grading and excavation shall be in compliance with the
Floodplain Management Ordinance for the Town of Readfield, Maine.
SECTION 7.
STORMWATER RUNOFF
All new construction and development shall be designed to reduce to the greatest extent
Article 8 Performance, Requirements and Standards
61
practicable any stormwater runoff from the site in excess of the pre-development conditions.
Where possible, existing natural runoff control features, such as berms, swales, terraces and
wooded areas shall be retained in order to reduce runoff and encourage infiltration of
stormwater on the site being developed. Stormwater shall not be channeled to discharge
directly into any waterbody or tributary stream, or abutting properties.
Stormwater runoff control systems shall be maintained as necessary to ensure proper
functioning. In addition, construction and development requiring site review pursuant to
Article 6 Section 3 shall also comply with the provisions of Article 6 Section 3(G)(15)
related to stormwater management.
SECTION 8.
EROSION CONTROL
All activities which involve filling, grading, excavation, well drilling, timber harvesting or
other similar activities which result in unstabilized soil conditions shall be conducted so as to
prevent soil erosion from entering waterbodies, wetlands and adjacent properties.
Pursuant to 38 MRS Section 439-B, any excavation contractor that engages in an activity that
disturbs, or displaces more than one cubic yard of soil within any Shoreland District must
ensure that a person certified by the Maine Department of Environmental Protection in
erosion and sedimentation control practices, is on-site. The certified contractor must be on-
site each day earthmoving activities occur and for a sufficient duration to ensure the proper
implementation of erosion and sedimentation control practices until the site is permanently
stabilized.
An erosion control plan may be required by the Code Enforcement Officer in conjunction
with any permit. All temporary and permanent erosion control measures shall be designed,
installed and maintained in accordance with the most applicable recent revision of:
- Maine Erosion and Sediment Control BMPS published by the Bureau of Land and Water
Quality, Maine Department of Environmental Protection, March 2003. Note: This
publication may be viewed online at:
http://www.maine.gov/dep/blwq/docstand/escbmps/index.htm.
- State of Maine, Strategy for Managing Nonpoint Source Pollution From Agricultural
Sources and Best Management System Guidelines, Developed by: NPS Agricultural Task
Force, October 1991.
- Erosion & Sediment Control Handbook for Maine Timber Harvesting Operations: Best
Management Practices published by the Forest Information Center, SHS #22, June 1991.
- Best Management Practices for Erosion & Sediment Control, published by the Maine
Department of Transportation, September 1997.
- Camp Road Maintenance Manual, A Guide for Landowners, published by the Kennebec
County Soil and Water District, June 2000.
Final grading and the installation of permanent erosion control measures must be substantially
complete prior to issuance of a Certificate of Occupancy or as a condition of a Certificate of
Occupancy.
SECTION 9.
PHOSPHORUS CONTROL
A.
Applicability
The following standards shall apply to all land uses that require site review and which are to
be located in the direct watershed of any great pond.
Article 8 Performance, Requirements and Standards
62
B.
Standards
A phosphorus control plan shall be developed and operated in accordance with the design
criteria contained in the "Phosphorus Control in Lake Watersheds: A Technical Guide for
Evaluating New Development," published by the Maine Department of Environmental
Protection, revised September, 1992 or as later revised. In addition, the applicant shall
obtain recommendations regarding appropriate phosphorous loading data for the watershed
from the Cobbossee Watershed District or from the Department of Environmental Protection
for great ponds not within the Cobbossee Watershed, and supply copies of such data to the
Code Enforcement Officer within five days of its receipt.
SECTION 10. ARCHAEOLOGICAL SITES
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places,
as determined by the Planning Board shall be submitted by the applicant to the Maine
Historic Preservation Commission for review and comment, at least 20 days prior to action
being taken by the Planning Board. The Planning Board shall consider comments received
from the Commission prior to rendering a decision on the application.
SECTION 11. SIGNS
A.
Purpose
The Town of Readfield recognizes the predominantly rural character of the community and
wishes to develop sign regulations that reflect our small town atmosphere; are distinct from
other more developed parts of the State; and, further the goals and objectives set forth in the
Comprehensive Plan and in Title 23 M.R.S.A. Chapter 21, The Maine Traveler Information
Services Act.
The purposes for these sign regulations are to encourage the effective use of signs as a means
of communication in the Town of Readfield; to maintain and enhance the aesthetic
environment of the Town; to attract and maintain a robust business climate in the Town; to
improve and maintain pedestrian and traffic safety; to minimize the possible adverse impact
of signs on nearby public and private property; and to protect the public health, safety and
welfare of the residents of the Town of Readfield.
B.
General Requirements
1. Except where otherwise specifically allowed in this Section, signs shall not be located
within the limits of any public right-of-way and shall relate to the premises on which
they are located and shall identify only the occupants of said premises or advertise the
nature of the products, services or activities available within said premises.
2. Signs shall be maintained in a safe and secure condition, kept clean, legible, and free
from deterioration, and free from all hazards such as loose fastenings or letters. Signs
must be located so as not to impair pedestrian and vehicular traffic safety.
3. Except for temporary signs, sandwich boards, flags, banners, pennants, insignias and
window signs, all signs shall be constructed of permanent materials and shall be
permanently attached to the ground, a building, or another structure by direct
attachment to a rigid wall, frame or structure.
4. Any commercial establishment or facility whose principal building or point of interest
is located on a private way more than one-thousand (1,000) feet from the nearest public
Article 8 Performance, Requirements and Standards
63
way, or is not visible to traffic from the nearest public way, may erect no more than one
(1) approach sign including a double-sided sign with a total surface area not to exceed
that which is allowed in the district in which the sign is to be located. This sign shall be
located outside the public right-of-way limits and within three hundred (300) feet of the
junction of the public and private ways.
5. No sign shall be displayed more than twenty (20) feet above grade as measured from the
top of the sign or extend above the lowest point of the main roof line of the principal
building, whichever is less.
6. No sign shall be placed on the roof of any building.
7. Signs may be lighted by an external light source directed solely onto the sign subject to
the limitations set forth in subsection 15. Lighting shall be effectively shielded to
prevent beams or rays of light from being directed at any portion of a public or private
way. Lighting shall not be of such intensity or brilliance as to cause glaring illumination
or otherwise impair or interfere with the vision of the operator of any vehicle. Signs
shall not be internally lighted.
8. Signs relating to public health and safety shall be permitted without restriction, provided
such sign does not promote any individual or private entity.
C. Non-Conforming Signs
Non-conforming signs that were otherwise lawful on the effective date of this Section may
continue in existence except as provided below:
1. No non-conforming sign shall be changed or altered unless such sign is made to conform
to these regulations. A change or alteration shall not include normal maintenance and
repair or a change in name provided the lettering conforms to the previous lettering and
there are no other changes.
2. No illumination shall be added to a non-conforming sign.
3. A non-conforming sign shall not be relocated except to bring the sign into compliance
with this Section.
4. The message of a non-conforming sign may be changed in accordance with Maine law so
long as this change does not create any new non-conformity.
5. A non-conforming sign located on the private property of a commercial establishment
which becomes vacant and is unoccupied for a period of ninety (90) days shall be
removed by the owner of the sign or owner of the property. This provision shall not
apply to (1) seasonal activities during the regular periods in which the seasonal activity is
not open for business, or (2) a commercial establishment temporarily suspended because
of change of ownership or management, in which case the non-conforming sign may
remain for up to one hundred eighty (180) days.
6. A non-conforming sign which is damaged by more than fifty (50) percent of its
replacement cost before such damage, or is removed or destroyed, shall be replaced only
with a sign complying with the provisions of this Section.
7. Temporary, non-conforming signs located on the premises of a commercial
establishment shall be allowed with a permit issued by the Code Enforcement Officer.
Article 8 Performance, Requirements and Standards
64
Such a sign shall not exceed thirty-two (32) square feet in area and shall be limited to
one (1) permit for one (1) sign for a period not to exceed thirty (30) consecutive days or
30 cumulative days total in any twelve (12) month period. Such a sign shall not contain
or include the prohibitions at E1, E2, E3, E4, E6, E8, E9 and E11 of this Section of the
Ordinance.
D. Signs Not Requiring Permits
The following types of signs shall be allowed, except where otherwise prohibited by law, and
shall not require a sign permit:
1. All permanent on premise signs, whether conforming or non-conforming, erected prior
to the effective date of this Section. Ordinary repair and maintenance of such signs shall
be allowed.
2. Any sign approved by the Planning Board, as an element of Site Plan or Subdivision
review.
3. One (1) sign not to exceed two (2) square feet used to display the street number and/or
name of the occupants of the premises.
4. Temporary signs, flags, banners, and string pennants displayed on private property
outside the public right-of-way for thirty (30) days or less in any twelve (12) month
period to advertise school, non-profit, civic, church and like public events.
5. Signs for garage sales, auctions, and similar temporary events, provided the signs shall
be displayed on private property outside the public right-of-way for no more than
fourteen (14) days in any twelve (12) month period and are removed within three (3)
days of the end of the event.
6. Two signs not exceeding six (6) square feet advertising the sale, lease or rental of the
premises or personal property upon which the sign is located. Such signs shall be
removed within one (1) week after the sale, lease or rental of the property.
7. One (1) sign each for a property owner, contractor, subcontractor, designer or engineer,
not to exceed sixteen (16) square feet each, relating to active on-site construction
projects. Such signs shall be removed within thirty (30) days after construction is
complete.
8. Customary holiday decorations.
9. One (1) sign on premises not exceeding thirty-two (32) square feet in area identifying
the name of a farm and/or describing farm products for sale on the premises.
10. Temporary off-premises signs erected by a producer of agricultural products, provided
all signs:
a. advertise only those products grown, produced and sold on the producer's premises
and are available for immediate purchase;
b. are located within five (5) miles of where the product is sold;
c. are directional in nature;
d. are not displayed from a location with frontage adjacent to the same road on which
the producer grows, produces and sells the agricultural products;
e. are located a minimum distance of thirty-three (33) feet from the center of a state
road;
Article 8 Performance, Requirements and Standards
65
f. are not located within the right-of-way of any Town road;
g. are removed within three (3) days following the last date the agricultural product
advertised is no longer available;
h. do not exceed eight (8) square feet in size; and
i.
are erected on private property and the producer erecting the sign has obtained the
landowner's written consent.
The producer of these agricultural products shall not display more than four (4) signs
pursuant to this paragraph at any one (1) time.
11. Signs bearing political messages relating to an election, primary or referendum, provided
that these signs may not be placed within the right-of-way prior to six (6) weeks before the
election, primary or referendum to which they relate and must be removed by the candidate
or political committee not later than one (1) week thereafter.
12. Any sign(s) placed by the State or Federal governments, or Town of Readfield, that
comply with Maine Department of Transportation standards and Federal and Maine Law.
This shall include the placement of official business directional signs.
13. Outdoor signs identifying public information such as, but not limited to, restrooms,
parking, entrances, and exits. Such signs shall be limited to two (2) per premises and one
(1) per entrance or exit and shall not be larger than two (2) square feet per sign and shall be
installed on breakaway posts.
14. Four (4) or fewer commercial flags, banners or insignias not exceeding sixty (60) square
feet in total area, per commercial lot or business, provided no single flag, banner or
insignia shall exceed thirty-two (32) square feet in area.
15. Flags, pennants, or insignia of any governmental or nonprofit organization when not
displayed in connection with a commercial promotion or as an advertising device. Signs
identifying a religious and/or civic organization and showing the time and place of services
or meetings are not commercial promotions or advertising if such signs are within the
constraints of size provided for in Section 14.F.
16. Memorial or historical signs, tablets, or other markers including names of buildings and
date of construction.
17. Signs relating to trespassing, fishing, hunting, trails, natural or historic points of interest,
and the like provided that each sign shall not exceed two (2) square feet and the signs are
not located closer to each other than fifty (50) feet on private property unless due to the
topography, coverage or other features of the land it is necessary to locate signs closer than
fifty (50) feet in order to inform the public adequately.
18. Traditional non-commercial "camp road" signs, on- or off-premises. Each sign shall be
located on privately owned property and shall not exceed two (2) square feet in area and
contain no off-premises advertising.
19. One (1) sandwich board per commercial establishment may be placed on the sidewalk in
front of the structure in which the commercial establishment is located provided it does not
interfere with pedestrian movement and shall be displayed only during daylight hours of
operation.
20. Signs located within the Shoreland Districts relating to the use or protection of a waterbody
or wetland. These signs may be placed together as a kiosk.
Article 8 Performance, Requirements and Standards
66
E. Prohibited Signs
The following signs are prohibited in all areas of the Town of Readfield:
1. Signs that have visible moving parts, or the appearance of movement, or intermittent,
blinking, moving, flashing, or glaring illuminations, or changing light intensity,
brightness or color. These signs include strings of lights, pennants, ribbons, streamers,
sheets, spinners, and the like.
2. Signs on which the message is changed mechanically or electronically more than once
every four (4) hours.
3. Signs that utilize sound or music to attract attention if that sound or music travels beyond
the boundary of the premises.
4. Signs larger than six (6) square feet in area displaying fluorescent colors or
phosphorescent paint,
5. No signs except traffic and similar public safety signs or official business directional
signs shall be located in the public right-of-way of any street or highway except as
necessary to comply with the "Addressing Ordinance of the Town of Readfield," and as
provided in subsection D.11.
6. Signs located in or projecting or protruding into a public right-of-way, except where
otherwise specifically allowed in this Section.
7. Signs, except wall signs attached to existing non-conforming structures, which do not
meet the side and rear property line setbacks for structures for the District in which they
are located.
8. Permanent signs consisting of any balloon, kite, or other aerial device whether tethered
or untethered.
9. Signs that interfere with the view necessary for motorists to proceed safely through
intersections or railroad crossings or to enter onto or exit public or private roads.
10. Signs painted on or attached to stationary vehicles, except for signs relating to the sale of
the vehicle. A vehicle may be determined by the Code Enforcement Officer to be
stationary if the vehicle is continuously in the same location or moved only infrequently
to another location to appear to circumvent the intent of this provision.
11. Signs on rocks, trees, public utility poles or fixtures, or any traffic control signs or
devices or other natural features.
12. Temporary, movable talking signs, except as provided for in subsection C.7, and except
for "sandwich" boards.
13. Signs painted on or attached to a roof.
F. Specific Standards
1. Except as described in subsection F.4 (below), and except for sandwich boards, a
business or commercial establishment is allowed a total of four (4) signs which shall
comply with the following standards:
a. In areas where the speed limit is thirty-five (35) mph or less, any sign shall not
exceed twenty-five (25) square feet in area in the Village, Commercial Industrial, or
Rural Districts, with a minimum upper case letter height of six (6) inches for the
primary message.
b. In areas where the speed limit is greater than thirty-five (35) mph, any sign shall not
exceed thirty-six (36) square feet in area in the Village, Commercial Industrial, or
Rural Districts, with a minimum upper case letter height of nine (9) inches for the
primary message.
c. Lower case letters shall be sized in proportion to the upper case letters of the font
style used.
d. A maximum of one (1) free-standing sign structure shall be permitted for each
premises. Such sign is subject to the size limitations as specified for its location. The
Article 8 Performance, Requirements and Standards
67
total of all individual establishments located within a mall, business or industrial
park, office building or similar multi-tenant complex shall be considered a single
premise and may only erect one free standing sign. The sign may contain the name
of the mall, offices, business or industrial park, etc. and further include an
identification sign for each individual tenant or premise. This free-standing sign may
exceed the size limitation specified for its location by an additional fifty (50) percent.
2. Home occupation signs shall not exceed six (6) square feet in area and shall not exceed
one (1) per premises, which may be a free-standing sign.
3. The area of signs shall be computed as follows:
a. The area of a sign shall be the surface or space between the outlines of the sign
including the borders. The structural supports shall be excluded if they do not
constitute a major part of the sign or if the structure is not used to identify or attract
attention to the business.
b. The area of two-sided signs, or two (2) signs identically sized, and placed back to
back and are part of the same sign structure, shall be computed by measurement of
one (1) of the faces.
c. The area of multi-faced signs shall be computed by adding together the area of all
sign faces visible from any one (1) point.
d. The area of the sign shall include any device, object or other visual aid which is an
integral part of the sign.
4. Signs in the Rural Residential, Village Residential, Resource Protection, Stream
Protection, and Shoreland Residential/Recreational Districts shall not exceed six (6)
square feet in area and shall not exceed two (2) signs per premises, except that signs used
to identify an institutional use may be sized to the extent necessary to comply with the
minimum letter height requirement described in Section 14 F.1.a-c (above).
5. The faces of conforming sign structures may be interchangeable provided they shall be
of the same area and construction and otherwise comply with all provisions of this
Section.
6. Any building exposed directly onto a public way may have a wall sign parallel to and
attached to a building, not to be set out more than ten (10) inches from the building.
7. Any building exposed directly onto a public way may have a projecting sign from the
wall of the building provided that (a) the area of the sign does not exceed twelve (12) sq.
ft., and (b) does not project more than four (4) feet from the building, and (c) the bottom
of the sign is at least eight (8) feet above the ground.
G. Removal Of Out-Dated Signs
Conforming signs which relate to any commercial establishment which has been out of
business for more than thirty (30) days shall be removed. The owner of the sign or owner of
the property or the owner's agent shall be responsible for removing such signs or those
portions of signs which identify the commercial establishment within thirty (30) days of its
closing.
SECTION 12. LIGHTING
A. Applicability
Exterior Lighting. The proposed development shall have adequate exterior lighting to
Article 8 Performance, Requirements and Standards
68
provide for its safe use during nighttime hours, if such use is contemplated. Lighting may be
used which serves security, safety and operational needs.
B. The following lighting standards shall apply to all land uses that require site review:
1.
Development shall not produce a stray, dazzling light or reflection of that light beyond
its lot lines onto neighboring properties or onto any public way so as to impair the vision
of any vehicle upon that way.
2.
Lighting fixtures shall be shielded or hooded so that lighting elements shine downward
so that the lights do not unnecessarily light the night sky.
3.
Direct or indirect illumination shall not exceed half (½) foot-candles upon abutting
properties, when measured at a distance of four feet from the ground.
4.
No lighting fixture, except for street lights shall extend beyond a height of twenty five
(25) feet, as measured from ground level.
5.
The location, type, height, and foot-candle power of all exterior lighting shall be shown
on the site plan.
6.
Wiring to light poles and standards to the greatest extent possible shall be underground.
7.
Building Illumination. Building facades may be illuminated with soft or accent lighting
of low non-reflective intensity. The light source for the building façade illumination
shall be concealed.
8.
All exterior lighting, except security and safety lighting shall be extinguished between
11 p.m. and 6 a.m., unless located on the site of a commercial, institutional or industrial
use which is open for business during that period.
9.
All emergency lighting and all hazard warning lighting required by police, fire, Federal
or other regulatory or emergency services shall be exempt from the requirements of this
section.
SECTION 13. COMMERCIAL, INDUSTRIAL, AND INSTITUTIONAL STANDARDS
A.
Applicability
In addition to meeting all applicable performance requirements and standards as set forth in
Article 8, the following standards shall also apply to all land uses defined as commercial,
industrial, and institutional as listed in the Table of Land Uses.
B.
Standards
1.
All solid waste storage areas shall be shielded from public view, and shall comply with
Section 25 of this Article to the extent that section is applicable.
2.
All manufacturing and processing shall be conducted within an enclosed area of a
structure. When outside processing or other activities are unavoidable due to the nature
of the operation, it shall be concealed from public view by a natural or
constructed screen. The screen shall be a minimum height of eight (8) feet and shall be
adequate to block the outside activity completely from public view. The screen may
consist of a fence, vegetative buffer, berm, or combination thereof. The screen shall be
designed to block the outside activity from view throughout the year.
Public view shall mean the view from the property line from the abutting property and
from any point across the road parallel to the frontage of the commercial, industrial or
institutional site.
3. Except for agricultural activities, all storage activities, including warehousing, shall
be screened from view from public way(s) and from abutting properties, through the
planting and maintaining of natural screening or buffer and through the siting of any
Article 8 Performance, Requirements and Standards
69
such activities and structures to minimize or eliminate such activities and structures
from public view and from the view of abutting properties.
SECTION 14. PARKING AREAS
1. Parking areas subject to site review shall meet the setback requirements to the greatest
extent practical for structures for the district in which such areas are located.
2. Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent stormwater runoff from flowing directly into a water body, and where feasible,
to retain all runoff on site.
3. In determining the appropriate size of proposed parking facilities, the following shall
apply:
a. Typical parking space: Approximately 10 feet wide and 20 feet long, except that
parking spaces for a vehicle and boat trailer shall be at least 10 feet wide by 40 feet
long.
b. Internal travel aisles: Approximately 20 feet wide.
SECTION 15. TRAFFIC ACCESS
A.
Purpose
The purpose of the traffic access standards shall be to control the design and placement of
driveways and intersections in order to maintain road safety and traffic carrying capacity of
the road. The standards shall be designed to allow traffic to enter and exit driveways safely
and efficiently so that the roadway can serve its primary function of providing long distance
access.
B.
Applicability
The Standards contained in this section shall apply to all development that requires site
review.
C.
Sight Distance
Driveways and other required accesses shall be located to achieve the required sight distance
measured in each direction along the arterial while maintaining adequate distances from
adjacent driveways and intersections.
1.
Measurements
a.
The sight distance shall be based on the posted speed limit.
b. Measurements shall be from the driver's seat of a vehicle that is 10 feet behind
the curb or edge of the shoulder line with the height of the eye 3½ feet above the
pavement and the height of object 4½ feet.
c. Where truck traffic from the development onto the arterial is expected to be
significant, the sight distance shall be increased by 50%. Height of eye should be
6 feet, with the height of the object no more then 4 ½ feet.
d. Where recreational vehicle traffic from the development is expected to be
significant, the sight distance shall be increased by 25%, height of eye should be
3½ feet, where the height of the object no more than 4½ feet.
e. Driveway and intersection road placement shall be such that an exiting vehicle
has an unobstructed sight distance according to the following schedules for
Article 8 Performance, Requirements and Standards
70
low/medium driveways and high volume driveways.
Highway Speed (MPH)
Minimum Sight Distance in Feet
20
155
25
200
30
250
35
305
40
360
45
425
50
495
55
570
D. Driveways
1. All driveways installed, altered, changed, replaced, or extended after the effective date of
this Ordinance shall meet the following requirements:
a. Islands between driveway openings shall be provided with a minimum of 12 feet
between all driveways and 6 feet at all lot lines.
b. Openings for vehicular ingress and egress shall not exceed 24 feet at the street line
and 30 feet on the roadway.
c. The term driveways in this section shall mean an entrance used by vehicular traffic
to access property abutting a road.
2. Minimum driveway lengths, as measured from the point of intersection with the arterial,
shall be of adequate length to accommodate queuing up of the maximum number of
vehicles, as defined by the peak period of operation identified in the traffic impact study,
such that, to the maximum extent possible, no waiting vehicle remains on the arterial.
3. After the effective date of this Ordinance, all future driveways shall be designed with
sufficient vehicle turn-around area to enable a driver to exit the premises without backing
onto the arterial. This requirement shall be deemed to be met by an onsite parking lot
with a parking aisle, or by a service or frontage road, or by the use of an onsite driveway
turn-around for a single vehicle measuring at least 8 feet wide by 15 feet long.
E. Shared Driveways
The Planning Board may require the construction and use of shared driveways to
improve public safety by reducing the number of entrances onto a public road or by
avoiding a driveway at a potentially dangerous location; to further environmental
protection, such as by eliminating a wetlands crossing; and to minimize negative
impacts on the surrounding neighborhood.
1. A Shared driveway is shared by two single-family dwellings or one two-family dwelling or
principal structures and requires an approved name by the Road Commissioner; three or
more dwellings / principal structures is a road.
2. An Application which includes a shared driveway shall include a draft document providing
for restrictive covenants and easements binding present and future owners of all lots served
by the shared driveway, which must be reviewed and approved by the Planning Board. If
the application for a Shared Driveway is approved, the final document(s) shall be recorded
at the Kennebec County Registry of Deeds and shall also be recited in and attached to
Article 8 Performance, Requirements and Standards
71
every deed to every lot served by the shared driveway. Such document(s) must include the
following information:
a. Provision for the management, maintenance, snow removal, improvement and
repair of the shared driveway and any improvements thereon, including, but not
limited to, the traveled way, drainage systems and signage;
b. Text of proposed easements including the metes and bounds description;
c. Procedure for the resolution of disagreements;
d. Method by which such instrument may be amended;
3. The shared driveway shall not be extended or serve additional lots without further Board
approval;
4. The shared driveway shall not be connected to any other way except to where it originates
on the public road, without further Board approval;
E.
Highway Access
No direct public or private access shall be permitted to the existing or proposed right-of-way
of the following:
1. Arterial streets intersecting another arterial street within 100 feet of the intersection of the
right-of-way lines.
2. Streets intersecting an arterial street within 50 feet of the intersection of the right-of-way
lines.
3. Access barriers such as curbing, fencing, ditching, landscaping, or other topographic
barriers shall be created to prevent unauthorized vehicular ingress and egress to the above
specified streets or highways.
4. Temporary access to the above rights-of-way may be granted by the Planning Board after
a. review and recommendation by highway agencies having jurisdiction. Such access
b. permit shall be temporary, revocable, and subject to any conditions required and
shall be
c. issued for a period not to exceed 12 months.
F.
Inter-Connections
For all projects, provisions for vehicular circulation connections to future projects on
adjacent properties shall be encouraged whenever feasible and to the maximum extent
possible.
G. Loading Docks
All buildings, structures and uses which have a total gross floor area and effectively utilized
outdoor ground space of more than 5,000 square feet shall provide loading areas so that
vehicles loading and maneuvering, or unloading and maneuvering are completely off the
public ways and so that no vehicles need back onto any public way.
H. Traffic Impact Study
The developer shall provide a description of the traffic movement to be generated by the
development including types, peak hour and average daily vehicle trips, travel routes, and
duration of traffic movement both during and following construction.
1. A full traffic impact study shall be performed by the developer if one of the two
conditions is met:
Article 8 Performance, Requirements and Standards
72
a. During any one-hour period, traffic attributable to the development equals or exceeds
50 trips at the project driveways. A trip can be either inbound or outbound.
b. The Planning Board in consultation with the Maine Department of Transportation,
may determine that a traffic impact study shall be conducted because of traffic
safety or capacity deficiencies in the vicinity of the development.
2. A full traffic study shall include the following:
a. A description of the site including, as applicable, the locations of driveways and
streets located on any property immediately adjacent to the site and across the street
or road in the immediate vicinity of the project driveways.
b. A description of the existing and proposed uses of the site.
c. A regional map showing the site and roads in the vicinity of the development, and
other proposed projects in the vicinity of the development.
d. A description of any traffic increases that are likely to occur in the vicinity of the
development during the study period. The developer shall include, as applicable,
projects which are: under construction and not fully occupied; are pending state or
local approval; or have state or local approval but are not constructed or fully
occupied.
e. The study shall include a calculation of the trip generation for the development and
other likely traffic increases, including a summary table listing each type of land use,
the size involved, the average trip generation used, and the resultant total trips
generated.
f. The study shall include a description and diagram of the anticipated distribution of
traffic entering and exiting the site.
g. The study shall include a definition of the study area including all links and
intersections using the following threshold criteria:
(1) The study area shall include the first major intersection to either side of the
project driveways.
(2) The study area shall be expanded beyond the first major intersection to either
side of the project driveway to include those links and intersections for which,
during any one-hour period, traffic attributable to the development equals or
exceeds the following at any intersection in the vicinity of the development:
25 vehicles in a left-turn lane;
35 vehicles in a through lane, right-turn lane, or a combined through and
right-turn lane; or
35 vehicles (multiplying the left-turn lane volume by 1.5) in a combined
left-turn through and right-turn lane.
Capacity analyses of signalized intersections located outside of the study area
may be required if these signals are or should be interconnected with an
intersection located within the study area. The study area may need to be
extended if signal progression on a signal interconnect system is changed.
h. The study shall include a diagram and appropriate documentation of the traffic
volume on roads and intersections in the vicinity of the development for both the
estimated annual average daily traffic and the a.m. /p.m. peak hour traffic (including
turns during peak hour). The study shall also show the following on the traffic
diagrams:
Existing traffic volume based on actual counts.
Traffic attributable to other projects which are proposed or approved.
Traffic attributable to the development assuming full build-out and full
occupancy.
Projected traffic volume for the design hour at the time the development will
begin operation assuming full build-out and full occupancy of the project.
Left-turn lane/right-turn lane analysis.
i.
The study shall include a capacity analysis for determination of the level of service
Article 8 Performance, Requirements and Standards
73
for each road and intersection in the vicinity of the development. Capacity analysis
must be performed for all intersections which are currently operated or will be
operated as part of a signal interconnect system. The analysis shall report whether or
not length of storage for through or turning lanes is adequate.
j.
The study shall include an analysis of the need for new traffic signals in the vicinity
of the development. The manual of Uniform Traffic Control Devices shall be used as
the basis to analyze the need for construction or elimination of traffic signals as
appropriate.
k. The study shall include a determination of the available sight distances in all
directions at each intersection in the vicinity of the development.
l.
The study shall include an inventory and analysis of traffic accidents in the vicinity
of the development during the most recent 3-year period. A collision diagram shall
be provided for all links and intersections found to meet Maine Department of
Transportation criteria for "High Accident Locations".
m. The study shall include a description of recommendations for improvements to
deficient roads or intersections, and the results of implementation of
recommendations.
SECTION 16. RESOURCE PROTECTION, STREAM PROTECTION AND SHORELAND
RESIDENTIAL DISTRICT STANDARDS
A. Applicability and Purpose
The standards in this section apply to uses and activities occurring in the Stream Protection,
Resource Protection and Shoreland Residential Districts and supplement those environmental
permits required from State agencies. The purposes of this Section and other applicable
sections of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and
other wildlife habitat; to protect buildings and land from flooding and accelerated erosion; to
protect archeological and historic resources; to protect wetlands; to control building sites,
placement of structures and land uses; to conserve shore cover and visual as well as actual
points of access to inland waters; to conserve natural beauty and open space; and to
anticipate and respond to the impacts of development in shoreland areas.
B. Construction or Movement of Material
No movement of soil, sand, vegetation or other material, or construction activity, within 75
feet of the normal high water mark of a water body, stream tributary stream or the upland
edge of a wetland, shall be conducted without first obtaining all permits required under State
and Federal laws, including but not limited to, the Natural Resources Protection Act, Title 38
M.R.S.A., Section 480-A through 480-Y.
C.
General Provisions
1.
Land below the normal high-water line of a water body or upland edge of a wetland
and land beneath roads serving more than 2 lots shall not be included in calculating
minimum lot area.
2.
Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land
on both sides thereof after September 22, 1971.
3.
The minimum width of any lot within 100 feet, horizontal distance, of the normal high-
water line of a water body or upland edge of a wetland shall be equal to or greater than
Article 8 Performance, Requirements and Standards
74
the shore frontage requirement for a lot with the proposed use.
4.
If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each
additional unit, principal structure, or use.
5.
Notwithstanding the setback requirements, stairways or similar structures may be
allowed with a permit, to provide shoreline access in areas of steep slopes or unstable
soils provided; that the structure is limited to a maximum of 4 feet in width; the
structure does not extend below or over the normal high-water line of a waterbody or
upland edge of a wetland and that the applicant demonstrates that no reasonable access
alternative exists on the property.
6. A footpath, or a recreational trail for winter use during frozen ground conditions only,
not to exceed 6 feet in width as measured between tree trunks and/or shrub stems is
permitted within 100 feet, horizontal distance, inland from the normal high-water line
of a great pond and 75 feet, horizontal distance from any stream or the upland edge of
a wetland, and provided that a clear line of sight to the resource through the natural
buffer strip is not created.
D.
Clearing or Removal of Vegetation for Activities other than Timber Harvesting
1.
Within Resource Protection District abutting a great pond, there shall be no cutting,
clearing or removal of vegetation within the strip of land extending 75 feet, horizontal
distance, inland from the normal high-water line, except to remove safety hazards or as
permitted in Article 8, section 19.C.6 above. Elsewhere in the Resource Protection
District, the cutting, clearing or removal of vegetation shall be limited to that which
shall be necessary for uses expressly authorized in the District.
2. Except in areas as described in subsection 1 above, and except to allow for the
development of permitted uses, within a strip of land extending 100 feet, horizontal
distance, inland from the normal high-water line of a great pond and 75 feet, horizontal
distance from any other water body, tributary stream, or the upland edge of a wetland, a
natural buffer strip of vegetation shall be preserved as follows:
a. There shall be no cleared opening greater than 250 square feet in the forest canopy
(or other existing woody vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown.
b. Selective cutting, clearing, or removal of trees within the natural buffer strip shall
be permitted provided that a well distributed stand of trees and other natural
vegetation is maintained. For the purposes of this section a "well-distributed stand
of trees adjacent to a great pond or stream flowing to a great pond, shall be defined
as maintaining a rating score 24 or more in each 25-foot by 50 foot rectangular
(1250 square feet) area as determined by the following rating system:
Diameter of Tree at 4 ½ feet
Above Ground Level (inches)
Points
2-<4 inches
1
4-<8 inches 2
8-<12 inches 4
12 inches or greater 8
Article 8 Performance, Requirements and Standards
75
Adjacent to other waterbodies, tributary streams, and wetlands, a "well-distributed
stand of trees" is defined as maintaining a minimum rating score of 16 per 25-foot
by 50-foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains
four (4) trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in
diameter, three trees between 8 and 12 inches in diameter, and two trees over 12 inches
in diameter, the rating score is:
(4 x 1) + (2 x 2) + (3 x 4) + (2 x 8) = 36 points
Thus the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling12 points
(36-24=12) may be removed from the plot provided that no cleared openings
are created.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation
removed except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed
down to the minimum points required or as otherwise allowed by this
Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot
by 50-foot rectangular area may consist of trees greater than 12 inches in
diameter.
For the purposes of this section "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and
retaining at least five (5) saplings less than two (2) inches in diameter at four and
one half (4 ½) feet above ground level for each 25-foot by 50-foot rectangle area.
If five saplings do not exist, no woody stems less than two (2) inches in diameter
can be removed until 5 saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of
trees 4 inches or more in diameter, measured at 4 ½ feet above ground level may
be cut, cleared or removed in any 10-year period.
c. In order to protect water quality and wildlife habitat, existing vegetation under 3
feet in height and other ground cover, including leaf litter and the forest duff layer,
shall not be cut, covered, cleared or removed, except to provide for a footpath or
other permitted uses as described in Section 19 (D) paragraphs (2) and (2) (a)
above.
d. Pruning of tree branches on the bottom one-third (1/3) of the tree is permitted.
e. In order to maintain a buffer strip of vegetation, when the removal of
storm-damaged, diseased, unsafe, or dead trees results in the creation of
cleared openings, these openings shall be replanted with native tree species
6-ft. to 8-ft. in height unless new tree growth is present. This section does not
apply to those portions of public recreational facilities adjacent to public
swimming areas as long as cleared areas, are limited to the minimum area
necessary.
Article 8 Performance, Requirements and Standards
76
3.
At distances greater than one hundred feet, horizontal distance, from a great pond and
75 feet, horizontal distance, from the normal high-water line of any other waterbody,
tributary stream, or the upland edge of a wetland, there shall be permitted on any lot, in
any 10 year period, selective cutting of not more than 40% of the volume of trees 4
inches or more in diameter, measured 4 ½ feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the 40%
calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area. In no event shall cleared openings for any purpose, including
but not limited to, principal and accessory structures, driveways, lawns and sewage
disposal areas, exceed in the aggregate, 25% of the lot area within the shoreland zone
or 10,000 square feet, whichever is greater, including land previously cleared.
4.
Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as permitted by this Ordinance.
5.
Fields and other cleared openings which have reverted to primarily shrubs, trees, or
other woody vegetation shall be regulated under the provisions of Section 19 (D).
E.
Docks, Marinas, Piers, Wharfs, Bridges and Other Water-Dependent Structures and Uses
Extending Over or Beyond the Normal High-Water Line of a Water Body or Within a
Wetland
1.
Access from shore shall be developed on soils appropriate for such use and constructed
so as to control erosion.
3. The location shall not interfere with developed beach areas.
3.
The facility shall be located so as to minimize adverse effects on fisheries.
4.
The facility shall be no larger in dimension than necessary to carry on the activity and
be consistent with the surrounding character and uses of the area. A temporary pier,
dock, or wharf shall not be wider than six (6) feet for non-commercial uses.
5.
The use of a water-dependent structure shall not be converted to a use which is not
water-dependent.
6.
No new structure shall be built on, over, or abutting a dock or other structure extending
beyond the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the waterbody or wetland as an operational
necessity.
7. All docks shall be constructed of materials and with methods resistant to flood damage
and securely attached to the shoreline in a way not to impair or restrict flotation during
extreme water level, wind or wave conditions. Attachments may be made to a tree or
permanent structure using cable, chain or similar water-resistant materials of adequate
strength.
8. Docks exceeding 500 square feet in area or which have a fair market value exceeding
$3,000 shall first require the issuance of a Flood Hazard Development Permit.
9. Permanent docks are prohibited. Temporary docks must be removed from waterbodies
prior to seasonal freezing and remain removed until seasonal thaw. Upon removal, all
dock sections shall be stored in a location with an elevation of at least one foot above
the 100-year base flood elevation or securely attached to a tree or other permanent
fixed object or structure.
10. Docks shall be located to comply with all setback requirements for structures from
adjacent properties. In instances where the most appropriate soils for dock construction
and use are located within the setback area from adjacent properties, an alternative
location may be permitted as depicted in Appendix C of this Ordinance entitled,
"Riparian Rights Lines."
Article 8 Performance, Requirements and Standards
77
11. No more than one pier, dock, wharf, or similar structure extending or located below the
normal high-water line a water body or within a wetland is allowed on a single lot;
except that when a single lot contains at least twice the minimum shore frontage as
specified in Article 7, Section 6, a second structure may be allowed and may remain as
long as the lot is not further divided.
F.
Roads and Driveways
1.
Roads and driveways shall be set back at least 100 feet, horizontal distance, from the
normal high-water line of a great pond and 75 feet, horizontal distance from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a
wetland unless no reasonable alternative exists as determined by the Planning Board. If
no other reasonable alternative exists, the road and/or driveway setback requirement
shall be no less than 50 feet, horizontal distance, upon clear showing by the applicant
that appropriate techniques will be used to prevent sedimentation of the water body,
tributary stream or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and or the effective use of additional ditch relief culverts
and turnouts placed so as to avoid sedimentation of the water body, tributary stream or
wetland.
On slopes of greater than 20%, the road and/or driveway setback shall be increased by
10 feet, horizontal distance, for each 5% increase in slope above 20%.
This paragraph does not apply to approaches to water crossings nor to roads or
driveways that provide access to permitted structures, and to facilities located nearer to
the shoreline or tributary stream due to an operational necessity. The standards in this
paragraph do apply to approaches to docks for recreational uses. Roads and driveways
providing access to permitted structures within the setback area shall comply fully with
the requirements of this section, except for that portion of the road or driveway
necessary for direct access to the structure.
2.
Existing public roads may be expanded within the legal road right-of-way regardless of
their setback from a water body, tributary stream, or wetland.
3.
New roads and driveways are prohibited in the Resource Protection District except that
the Planning Board may grant a permit to construct a road or driveway to provide
access to permitted uses within the district. A road or driveway may also be approved
by the Planning Board in a Resource Protection District, upon a finding that no
reasonable alternative route or location is available outside the district. When a road or
driveway is permitted in a Resource Protection District, the road and/or driveway shall
be set back as far as practicable from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland.
4.
Road and driveway banks shall be no steeper than a slope of 2 horizontal to 1 vertical,
and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Article 8, section 11.
5.
Road and driveway grades shall be no greater than 10% except for segments of less
than 200 feet.
6.
In order to prevent road and driveway surface drainage from directly entering water
bodies, tributary streams or wetlands, roads and driveways shall be designed,
constructed, and maintained to empty onto an unscarified natural buffer strip at least 50
feet plus two times the average slope, in width between the outflow point of the ditch
Article 8 Performance, Requirements and Standards
78
or culvert and the normal high-water line of a water body, tributary stream, or upland
edge of a wetland. Surface drainage which is directed to an unscarified natural buffer
strip shall be diffused or spread out to promote infiltration of the runoff and to
minimize channelized flow of the drainage through the buffer strip.
7.
Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified natural buffer
strips before the flow gains sufficient volume or head to erode the road, driveway, or
ditch. To accomplish this, the following shall apply:
a. Ditch relief culverts, drainage dips and associated water turnouts shall be spaced
along the road or driveway, at intervals no greater than indicated in the following
table:
Grade
Spacing
(percent)
(feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21+
40
b. Drainage dips may be used in place of ditch relief culverts only where the road
grade is 10% or less.
c. On sections having slopes greater than 10% ditch relief culverts shall be placed at
approximately a 30-degree angle down slope from a line perpendicular to the
centerline of the road or driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order to
allow for effective functioning and their inlet and outlet ends shall be stabilized
with appropriate materials.
8.
Ditches, culverts, bridges, dips, water turnouts, and other stormwater runoff control
installations associated with roads and driveways shall be maintained on a regular basis
to assure effective functioning.
I.
Parking Areas
1.
Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities shall be no less than 50 feet,
horizontal distance, from the shoreline or tributary stream if the Planning Board finds
that no other reasonable alternative exists further from the shoreline or tributary
stream.
2.
Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent stormwater runoff from flowing directly into a water body, tributary stream or
wetland, and where feasible, to retain all runoff on site.
3.
In determining the appropriate size of proposed parking facilities, the following shall
apply:
a. Typical parking space: Approximately 10 feet wide and 20 feet long, except that
parking spaces for a vehicle with boat trailer shall be at least 10 feet wide and 40
feet long.
b. Internal travel aisles: Approximately 20 feet wide.
Article 8 Performance, Requirements and Standards
79
J.
Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including
severe erosion, mass soil movement, improper drainage, and water pollution, whether during
or after construction. Proposed uses requiring subsurface waste disposal and commercial land
uses shall require a soils report based on an on-site investigation and to be prepared by one of
the following: A Maine Certified Soil Scientist, Maine Registered Professional Engineer,
Maine State Certified Geologist, or another individual who has training and experience in the
recognition and evaluation of soil properties. The report shall be based upon the analysis of
the characteristics of the soil and surrounding land and water areas, maximum ground water
elevation, presence of ledge, drainage conditions, and other pertinent data which the
evaluator deemed appropriate. The soils report shall include recommendations for a proposed
use to counteract soil limitations where they exist.
K.
Timber Harvesting
(1) Shoreline integrity and sedimentation. Persons conducting timber harvesting and
related activities must take reasonable measures to avoid the disruption of shoreline
integrity, the occurrence of sedimentation of water, and the disturbance of water body
and tributary stream banks, water body and tributary stream channels, shorelines, and
soil lying within water bodies, tributary streams and wetlands. If, despite such
precautions, the disruption of shoreline integrity, sedimentation of water, or the
disturbance of water body and tributary stream banks, water body and tributary stream
channels, shorelines, and soil lying within water bodies, tributary streams and wetlands
occurs, such conditions must be corrected.
(2) Slash treatment. Timber harvesting and related activities shall be conducted such that
slash or debris is not left below the normal high-water line of any water body or
tributary stream, or the upland edge of a wetland. This section does not apply to
minor, incidental amounts of slash that result from timber harvesting and related
activities otherwise conducted in compliance with this section.
(a) Slash actively used to protect soil from disturbance by equipment or to stabilize
exposed soil, may be left in place, provided that no part thereof extends more than
4 feet above the ground.
(b) Adjacent to great ponds, rivers and wetlands:
(i) No accumulation of slash shall be left within 50 feet, horizontal distance, of the
normal high-water line or upland edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of the normal high-water
line or upland edge of a wetland, all slash larger than 3 inches in diameter must
be disposed of in such a manner that no part thereof extends more than 4 feet
above the ground.
(3) Timber harvesting and related activities must leave adequate tree cover and shall be
conducted so that a well-distributed stand of trees is retained. This requirement may be
satisfied by following one of the following three options:
(a) Option 1 (40% volume removal), as follows:
Article 8 Performance, Requirements and Standards
80
(i) Harvesting of no more than 40 percent of the total volume on each acre of trees
4.5 inches DBH or greater in any 10 year period is allowed. Volume may be
considered to be equivalent to basal area;
(ii) A well-distributed stand of trees which is wind firm, and other vegetation
including existing ground cover, must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers,
streams, and great ponds, and within 75 feet, horizontal distance, of the upland
edge of a wetland, there must be no cleared openings. At distances greater than 75
feet, horizontal distance, of the normal high-water line of a river or great pond or
upland edge of a wetland, timber harvesting and related activities must not create
single cleared openings greater than 14,000 square feet in the forest canopy. Where
such openings exceed 10,000 square feet, they must be at least 100 feet, horizontal
distance, apart. Such cleared openings will be included in the calculation of total
volume removal. Volume may be considered equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of at least 60 square feet
per acre of woody vegetation greater than or equal to 1.0 inch DBH, of which
40 square feet per acre must be greater than or equal to 4.5 inches DBH;
(ii) A well-distributed stand of trees which is wind firm, and other vegetation
including existing ground cover, must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of water
bodies and within 75 feet, horizontal distance, of the upland edge of wetlands,
there must be no cleared openings. At distances greater than 75 feet, horizontal
distance, of the normal high-water line of a river or great pond, or upland edge
of a wetland, timber harvesting and related activities must not create single
cleared openings greater than 14,000 square feet in the forest canopy. Where
such openings exceed 10,000 square feet, they must be at least 100 feet,
horizontal distance, apart. Such cleared openings will be included in the
calculation of the average basal area. Volume may be considered equivalent to
basal area.
(c) Option 3 (Outcome based), which requires: An alternative method proposed in an
application, signed by a Licensed Forester or certified wildlife professional,
submitted by the landowner or designated agent to the State of Maine Department
of Conservation's Bureau of Forestry (Bureau) for review and approval, which
provides equal or better protection of the shoreland area than this rule.
Landowners must designate on the Forest Operations Notification form required by 12
M.R.S.A. chapter 805, subchapter 5 which option they choose to use. If landowners
choose Option 1 or Option 2, compliance will be determined solely on the criteria for the
option chosen. If landowners choose Option 3, timber harvesting and related activities
may not begin until the Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is
retained through a field procedure that uses sample plots that are located randomly or
systematically to provide a fair representation of the harvest area.
(4) Skid trails, yards, and equipment operation. This requirement applies to the construction,
maintenance, and use of skid trails and yards in shoreland areas.
Article 8 Performance, Requirements and Standards
81
(a) Equipment used in timber harvesting and related activities shall not use river, stream or
tributary stream channels as travel routes except when surface waters are frozen and
snow covered, and the activity will not result in any ground disturbance.
(b) Skid trails and yards must be designed and constructed to prevent sediment and
concentrated water runoff from entering a water body, tributary stream, or wetland.
Upon termination of their use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet,
horizontal distance, of any water body, tributary stream, or wetland. On slopes of
10 percent or greater, the setback for equipment operation must be increased by 20
feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5
percent increase in slope above 10 percent. Where slopes fall away from the
resource, no increase in the 25-foot setback is required.
(ii) Where such setbacks are impracticable, appropriate techniques shall be used to
avoid sedimentation of the water body, tributary stream or wetland. Such
techniques may include the installation of sump holes or settling basins, and/or the
effective use of additional ditch relief culverts and ditch water turnouts placed to
avoid sedimentation of the water body, tributary stream, or wetland. If, despite
such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to crossings of
water bodies, tributary stream channels, and wetlands, ditches and other related structures,
must be designed, constructed, and maintained to prevent sediment and concentrated water
runoff from directly entering the water body, tributary stream or wetland. Surface water on
or adjacent to water crossing approaches must be diverted through vegetative filter strips to
avoid sedimentation of the watercourse or wetland. Because roadside ditches may not
extend to the resource being crossed, vegetative filter strips must be established in
accordance with the setback requirements in this section.
(a) Land management roads and associated ditches, excavation, and fill must be set back at
least:
(i) 100 feet, horizontal distance, from the normal high-water line of a great pond, river
or wetland;
(ii) 50 feet, horizontal distance, from the normal high-water line of streams; and
(iii) 25 feet, horizontal distance, from the normal high-water line of tributary streams
(b) The minimum 100 foot setback specified above may be reduced to no less than 50 feet,
horizontal distance, and the 50 foot setback specified above may be reduced to no less
than 25 feet, horizontal distance, if, prior to construction, the landowner or the
landowner's designated agent demonstrates to the Planning Board's satisfaction that no
reasonable alternative exists and that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may
include, but are not limited to, the installation of settling basins, and/or the effective
use of additional ditch relief culverts and turnouts placed to avoid sedimentation of the
Article 8 Performance, Requirements and Standards
82
water body, tributary stream or wetland. If, despite such precautions, sedimentation or
the disruption of shoreline integrity occurs, such conditions must be corrected.
(c) On slopes of 10 percent or greater, the land management road setback must be
increased by at least 20 feet, horizontal distance, plus an additional 10 feet, horizontal
distance, for each 5 percent increase in slope above 10 percent.
(d) New land management roads are not allowed in a Resource Protection District, unless,
prior to construction, the landowner or the landowner's designated agent makes a clear
demonstration to the Planning Board's satisfaction that no reasonable alternative route
exists outside the shoreland zone, and that the new road must be set back as far as
practicable from the normal high-water line and screened from the water body by
existing vegetation.
(e) Ditches, culverts, bridges, dips, water turnouts and other water control installations
associated with roads must be maintained on a regular basis to assure effective
functioning. Drainage structures shall deliver a dispersed flow of water into an
unscarified filter strip no less than the width indicated in the setback requirements in
this section. Where such a filter strip is impracticable, appropriate techniques shall be
used to avoid sedimentation of the water body, tributary stream, or wetland. Such
techniques may include the installation of sump holes or settling basins, and/or the
effective use of additional ditch relief culverts and ditch water turnouts placed to avoid
sedimentation of the water body, tributary stream, or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water control installations
required in this section must continue until use of the road is discontinued and the road
is put to bed by effective installation of water bars or other adequate road drainage
structures at appropriate intervals, constructed to avoid surface water flowing over or
under the water bar, and extending a sufficient distance beyond the traveled way so
that water does not reenter the road surface.
(g) Upgrading existing roads. Extension or enlargement of presently existing
roads must conform to the provisions of this section. Any nonconforming existing
road may continue to exist and to be maintained, as long as the nonconforming
conditions are not made more nonconforming.
(h) Exception. Extension or enlargement of presently existing roads need not conform
to the setback requirements of this section if, prior to extension or enlargement, the
landowner or the landowner's designated agent demonstrates to the Planning Board's
satisfaction that no reasonable alternative exists and that appropriate techniques will be
used to prevent sedimentation of the water body, tributary stream, or wetland. Such
techniques may include, but are not limited to, the installation of settling basins, and/or
the effective use of additional ditch relief culverts and turnouts placed to avoid
sedimentation of the water body, tributary stream, or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
(i) Additional measures. In addition to the foregoing minimum requirements,
persons undertaking construction and maintenance of roads and river, stream and
tributary stream crossings must take reasonable measures to avoid sedimentation of
surface waters.
Article 8 Performance, Requirements and Standards
83
(6) Crossings of waterbodies. Crossings of rivers, streams, and tributary streams must allow
for fish passage at all times of the year, must not impound water, and must allow for the
maintenance of normal flows.
(a) Determination of flow. Provided they are properly applied and used for the
circumstances for which they are designed, methods including but not limited to the
following are acceptable as a means of calculating the 10 year and 25 year frequency
water flows and thereby determining water crossing sizes as required in this section:
The United States Geological Survey (USGS) Methods; specifically: Hodgkins, G.
1999. Estimating the Magnitude of Peak Flows for Streams in Maine for Selected
Recurrence Intervals. U.S. Geological Survey. Water Resources Investigations Report
99-4008. 45 pp.
(b) Upgrading existing water crossings. Extension or enlargement of presently existing
water crossings must conform to the provisions of this section. Any nonconforming
existing water crossing may continue to exist and be maintained, as long as the
nonconforming conditions are not made more nonconforming; however, any
maintenance or repair work done below the normal high-water line must conform to
the provisions of this section.
(c) Other Agency Permits. Any timber harvesting and related activities involving the
design, construction, and maintenance of crossings on waterbodies other than a river,
stream or tributary stream may require a permit from the Department of Environmental
Protection, or the US Army Corps of Engineers.
(d) Any timber harvesting and related activities involving the design, construction, and
maintenance of crossings of wetlands identified by the Department of Inland Fisheries
and Wildlife as essential wildlife habitat require prior consultation with the Department
of Inland Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water crossing construction
maintenance, alteration and replacement activities in shoreland areas must be given to
the Bureau prior to the commencement of such activities. Such notice must contain all
information required by the Bureau, including:
(i)
a map showing the location of all proposed permanent crossings;
(ii)
the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a permit from state or
federal agencies, a copy of the approved permit or permits; and
(iv) a statement signed by the responsible party that all temporary and permanent
crossings will be constructed, maintained, and closed out in accordance with
the requirements of this Section.
(f) Water crossing standards. All crossings of rivers require a bridge or culvert sized
according to the requirements of this section. Streams and tributary streams may be
crossed using temporary structures that are not bridges or culverts provided:
(i) concentrated water runoff does not enter the stream or tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
(iii) there is no substantial disturbance of the bank, or stream or tributary stream
channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded.
Article 8 Performance, Requirements and Standards
84
Subject to this section, skid trail crossings of streams and tributary streams when
channels of such streams and tributary streams are frozen and snow-covered or are
composed of a hard surface which will not be eroded or otherwise damaged are not
required to use permanent or temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels
with a bridge or culvert, the following requirements apply:
(i) Bridges and culverts must be installed and maintained to provide an opening
sufficient in size and structure to accommodate 10 year frequency water flows or
with a cross-sectional area at least equal to 2 1/2 times the cross-sectional area of
the river, stream, or tributary stream channel.
(ii) Temporary bridge and culvert sizes may be smaller than provided in this section if
techniques are effectively employed such that in the event of culvert or bridge
failure, the natural course of water flow is maintained and sedimentation of the
water body or tributary stream is avoided. Such crossing structures must be at least
as wide as the channel and placed above the normal high-water line. Techniques
may include, but are not limited to, the effective use of any, a combination of, or
all of the following:
1. use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream crossings must:
1. be installed at or below river, stream or tributary stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of the culvert;
4. be covered by soil to a minimum depth of 1 foot or according to the
culvert manufacturer's specifications, whichever is greater; and
5. have a headwall at the inlet end which is adequately stabilized by riprap
or other suitable means to reasonably avoid erosion of material around the
culvert.
(iv) River, stream and tributary stream crossings allowed under this section but located
in flood hazard areas (i.e. A zones) as identified on a community's Flood Insurance
Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be designed
and constructed under the stricter standards contained in that community's National
Flood Insurance Program (NFIP). For example, a water crossing may be required
to pass a 100-year flood event.
(v) Exception. Skid trail crossings of tributary streams within shoreland areas and
wetlands adjacent to such streams may be undertaken in a manner not in
conformity with the requirements of the foregoing subsections provided persons
conducting such activities take reasonable measures to avoid the disruption of
shoreline integrity, the occurrence of sedimentation of water, and the disturbance
of stream banks, stream channels, shorelines, and soil lying within ponds and
wetlands. If, despite such precautions, the disruption of shoreline integrity,
sedimentation of water, or the disturbance of stream banks, stream channels,
shorelines, and soil lying within ponds and wetlands occurs, such conditions must
be corrected.
Article 8 Performance, Requirements and Standards
85
(h) Skid trail closeout. Upon completion of timber harvesting and related activities, or
upon the expiration of a Forest Operations Notification, whichever is earlier, the
following requirements apply:
(i) Bridges and culverts installed for river, stream and tributary stream crossings by
skid trails must either be removed and areas of exposed soil stabilized, or upgraded
to comply with the closeout standards for land management roads below.
(ii) Water crossing structures that are not bridges or culverts must either be removed
immediately following timber harvesting and related activities, or, if frozen into
the river, stream or tributary stream bed or bank, as soon as practical after
snowmelt.
(iii) River, stream and tributary stream channels, banks and approaches to crossings of
water bodies and tributary streams must be immediately stabilized on completion
of harvest, or if the ground is frozen and/or snow-covered, as soon as practical
after snowmelt. If, despite such precautions, sedimentation or the disruption of
shoreline integrity occurs, such conditions must be corrected.
(i) Land management road closeout. Maintenance of the water control features must
continue until use of the road is discontinued and the road is put to bed by taking the
following actions:
(i) Effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to reasonably avoid surface water flowing over
or under the water bar, and extending sufficient distance beyond the traveled way
so that water does not reenter the road surface.
(ii) Water crossing structures must be appropriately sized or dismantled and removed
in a manner that reasonably avoids sedimentation of the water body or tributary
stream.
(iii) Any bridge or water crossing culvert in roads to be discontinued shall satisfy one
of the following requirements:
1. it shall be designed to provide an opening sufficient in size and structure to
accommodate 25 year frequency water flows;
2. it shall be designed to provide an opening with a cross-sectional area at least 3
1/2 times the cross-sectional area of the river, stream or tributary stream
channel; or
3. it shall be dismantled and removed in a fashion to reasonably avoid
sedimentation of the river, stream or tributary stream.
If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
(7) Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained as
specified in this section, but in no case shall be less than shown in the following table.
Article 8 Performance, Requirements and Standards
86
Average slope of land between exposed mineral
Width of strip between exposed
soil and the shoreline (percent)
mineral soil and shoreline
(feet along surface of the ground)
0
25
10
45
20
65
30
85
40
105
50
125
60
145
70
165
L.
Agriculture in Shoreland Districts
1.
All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on
November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-
4209).
2.
Manure shall not be stored or stockpiled within 100 feet, horizontal distance, of a great
pond or within 75 feet horizontal distance, of other water bodies, tributary streams, or
wetlands. All manure storage areas within the Resource Protection, Stream Protection,
and the Shoreland Residential Districts must be constructed or modified such that the
facility produces no discharge of effluent or contaminated stormwater.
3.
Agricultural activities involving the tillage of soil greater than 40,000 square feet in
surface area shall require a Conservation Plan to be filed with the Planning Board.
Non-conformance with the provisions of the plan shall be considered to be a violation
of this Ordinance.
4.
There shall be no new tilling of soil within 100 feet, horizontal distance, of the normal
high-water line of a great pond; within 75 feet, horizontal distance, from other water
bodies; nor within 25 feet, horizontal distance, of tributary streams and wetlands.
Operations in existence on the effective date of this Ordinance (and not in compliance
with this provision) may be maintained.
5.
Newly established livestock grazing areas shall not be permitted within 100 feet,
horizontal distance, of the normal high-water line of a great pond, within 75 feet of
other water bodies, nor within 25 feet of a tributary streams and wetlands, Livestock
grazing associated with ongoing farm activities, and which are not in conformance
with the above setback provisions may continue, provided that such grazing is
conducted in accordance with a Soil and Water Conservation Plan.
M.
Essential Services
1.
Where feasible, the installation of essential services shall be limited to existing public
ways and existing service corridors.
2.
The installation of essential services is not permitted in the Resource Protection or
Stream Protection District, except to provide services to a permitted use within said
district, or except where the applicant demonstrates that no reasonable alternative
exists. Where permitted, such structures and facilities shall be located so as to
minimize any adverse impact on surrounding uses and resources, including visual
impacts.
Article 8 Performance, Requirements and Standards
87
3.
Damaged or destroyed public utility transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
N.
Single Family Dwellings in the Resource Protection District
1.
The Planning Board may approve a permit for a single-family home in the Resource
Protection District provided that all of the following standards shall be met:
a. There shall be no other location on the property, where the structure can be built,
other than a location within the Resource Protection District.
b. The lot on which the structure is proposed shall be undeveloped and shall be
established and recorded in the registry of deeds in Kennebec County before the
adoption of the Resource Protection District.
c. The proposed location of all buildings, sewage disposal systems and other
Improvements shall be:
(1)
Located on natural ground slopes of less than 20% ; and
(2)
Located outside the 100-year floodplain as delineated on the National Flood
Insurance Program Flood Insurance Rate Maps; all buildings, including
basements, shall be elevated at least one foot above the 100-year floodplain
elevation; and the development shall otherwise be in compliance with the
Town of Readfield Floodplain Management Ordinance.
d. The total ground-floor area (footprint), including cantilevered or similar overhang
extensions, of all principal and accessory structures shall be limited to a maximum
of 1,500 square feet. This limitation shall not be altered by variance.
e. All structures, except functionally water-dependent structures, shall be set back
from the normal high-water line of a waterbody, tributary stream, or upland edge
of a wetland to the greatest practical extent, but not less than 75 feet, horizontal
distance. In determining the greatest practical extent, the Planning Board shall
consider the depth of the lot, the slope of the land, the potential for soil erosion, the
type and amount of vegetation to be removed, the proposed building site's
elevation in regard to the floodplain, and its proximity to moderate-value and high-
value wetlands.
SECTION 17. SUBDIVISIONS
In reviewing all subdivision applications, the following standards shall apply:
A.
Conformance with Applicable Plans and Ordinances
All proposed subdivisions shall be in conformance with the Readfield Comprehensive
Plan, this Ordinance, and the provisions of all other pertinent federal, state, and local
codes, ordinances and regulations, except as otherwise provided in these regulations.
B.
Land Not Suitable for Development
The Planning Board shall not approve building sites where such portions of any
proposed subdivision involving:
1. Land which is situated below the normal high-water mark of any water body.
2. Land which is located within the 100-year frequency floodplain as identified by
the Federal Emergency Management Agency unless the Applicant shows proof
through the submittal of material prepared by a Registered Land Surveyor which
shows that the property in question lies at least one foot above the 100 year flood
level. The elevation of filled or made land shall not be considered.
3. Land which is part of a right-of-way, or easement, including utility easements.
4. Land which has been created by filling or draining a pond or wetland.
5. Land which is located within a Resource Protection District.
Article 8 Performance, Requirements and Standards
88
6. Land which is located on slopes greater than 20% or greater than 15% in a
Shoreland Residential District.
C.
Lots
1. All lots shall meet the minimum requirements of this Ordinance for the district in
which they are located, except as otherwise provided in accordance with this
section. The lot configuration shall be designed to maximize the use of solar
energy on building sites with suitable orientation.
2. Lot configuration and area shall be designed to provide for adequate off-street
parking.
3. Lots with multiple frontages shall be avoided wherever possible
4. Side lot lines shall be perpendicular to the street whenever possible.
5. Where public utilities could be extended to a subdivision in the foreseeable future,
the subdivision shall be designed to accommodate the extensions of utilities.
6. If a lot on one side of a road or stream fails to meet the minimum requirements for
lot size, it may not be combined with a lot on the other side of the road or stream
to meet the minimum lot size. When required to comply with the Readfield Land
Use Ordinances and/or the Maine State Plumbing Codes non-conforming lots in
the Shoreland Residential Districts shall be kept in common ownership.
7. Flag lots and other odd shaped lots in which narrow strips are joined to other
parcels in order to meet minimum dimensional requirements are prohibited.
8. Any proposed subdivisions shall be so designed that every lot has frontage upon a
way, granting legal access, and so that no part of the tract is landlocked.
9. To the greatest extent practical, lots shall be configured to minimize the number
of entrances onto a public road. This may require the development of new access
roads into the subdivision or by creating shared driveway entrances from the
public road. In determining the greatest extent practical the Board shall consider
among other factors: the impact on the amount of land to be developed; erosion
and stormwater controls, including future maintenance requirements for the
controls; traffic safety; phosphorus controls; proximity to wetlands or water
bodies; life and fire safety; impact upon municipal services, and any other
characteristics of the land or applicable site review criteria.
D.
Retention of Open Spaces and Natural Historic Features
1. In all non-shoreland districts, except for normal thinning, landscaping, and cutting
of trees to provide access to direct sunlight, existing vegetation shall be left intact
to prevent soil erosion. The Applicant shall be responsible for taking measures to
correct and prevent soil erosion in the proposed subdivision.
2. The Planning Board may require that the development plans include a landscape
plan that will provide for:
a.
the preservation of any existing trees larger than 24 inches diameter breast
height;
b. the replacement of trees and vegetation;
c.
graded contours; and
d. the protection of scenic, historic, or environmentally significant areas.
3. The street and lot layout shall be adapted to the topography to the maximum
extent.
4. Extensive grading and filling shall be avoided as much as possible.
5. Street trees and esplanades may be required by the Planning Board to retain the
natural beauty of the area.
6. The Planning Board may require that the Applicant reserve an area of land as an
Article 8 Performance, Requirements and Standards
89
open space and/or recreational area for use by property owners in the subdivision
or for other uses consistent with the town's Open Space Plan. Open space tracts
need not be contiguous to the proposed subdivision. Depending on the size and
location of the subdivision, the Planning Board may require the Applicant to
provide up to 10% of the total area for recreation. It is desirable that area reserved
for recreation be at least 5 acres in size and easily accessible from all lots within
the subdivision.
a.
Land reserved for open space purposes shall be of a character, configuration
and location suitable for the particular use intended. Sites selected primarily
for scenic or passive recreation purposes shall have such access as the
Planning Board may deem suitable and no less than 25 feet of road
frontage. The configuration of such sites shall be subject to determination
of adequacy by the Planning Board with regard to scenic attributes to be
preserved, together with sufficient areas for trails, lookouts, etc. where
necessary and appropriate.
b.
The Planning Board may require subdivisions be laid out in such a way that
fields and pastures remain as undeveloped as possible. Agricultural land
owners are not required to sell that part of their property which is to become
open space provided that they convey the development rights of that open
space to the Town or to a qualified land conservation organization in a
conservation easement prohibiting future non-agricultural development.
c.
Where the proposed subdivision is located on a lake, pond or stream, a
portion of the waterfront area, when feasible, shall be included in the
reserved land. The land so reserved shall be at least 200 feet wide measured
perpendicularly from the normal high-water mark.
d.
The Final Plan shall provide how title to the reserved recreational and open
space areas shall be held and how costs of improvements, maintenance and
taxes shall be met.
e.
Included in the instrument of conveyance to each property owner of the
subdivision shall be a statement of the manner of providing for the cost of
development and maintenance and for property taxes of the reserved land.
f.
The recorded subdivision shall indicate that the common open spaces shall
not be used for future building lots except for structures and buildings
accessory to new recreational or conservation uses; how title shall be held;
and who shall be responsible for costs of development and maintenance.
g.
In the event that the common open spaces are not to be owned by the
Applicant (or the municipality), an association of property owners, to own,
develop and maintain the common open spaces, shall be incorporated and
setup. The articles of incorporation and by-laws shall be submitted to the
Planning Board for its approval with the Final Plan.
h.
The Applicant shall maintain control of all common areas, and be
responsible for their maintenance, until sufficient development to support
the association as determined by the Planning Board, shall have taken
place.
i.
Reserved land acceptable to the Planning Board and Applicant may be
dedicated to the municipality if approved by the voters of the Town.
Dedication to the town of these open spaces may be in fee simple or in the
transfer of that parcel's development rights.
j.
Further subdivision of the common land or its use for other than non-
commercial recreation or conservation purposes shall be prohibited.
Structure and buildings accessory to non-commercial recreational or
conservation uses may be erected on the common land with Planning Board
approval.
k.
As an alternative or in addition to the applicant's reservation of land for
Article 8 Performance, Requirements and Standards
90
open space and/or recreation, the Planning Board may allow the applicant
to give a payment-in-lieu of dedication calculated at the market value of
land at the time of the subdivision's final approval, as determined by the
municipal tax assessor, and deposited into a municipal land acquisition or
improvement fund for use in accordance with the town's Open Space plan.
E.
Utilities
1. Utilities shall be installed underground when required by the Planning Board in
order to further the purposes specified in the Review Criteria of Article 6, Section
3 C, of this Ordinance.
2. Underground utilities shall be installed prior to the installation of the final gravel
base of the road.
3. The size, type and location of street lights, electric lines, telephone, and other
utilities shall be shown on the Final Plan and shall be subject to approval by the
Planning Board.
F. Required Improvements
The following improvements are required for all subdivisions unless waived by the
Planning Board in accordance with the provisions of this Ordinance. All required
improvements, such as streets, sidewalks, stormwater drainage systems, and where
appropriate, centralized water supply and sanitary sewage systems, shall be installed at
the expense of the applicant.
1. Permanent Markers
a. Permanent markers shall be set at all street intersections and points of curvature,
but no further than 750 feet apart along street lines without curves or
intersections.
b. Permanent markers shall be set at all corners and angle points of the subdivision
boundaries and lot boundaries.
2. Water Supply
a. If a central water supply system is provided by the Applicant, the location and
b. protection of the source, and the design, construction and operation of the system
shall conform to the standards of the Maine Rules Relating to Drinking Water
(10-144 A. C. M. R. 231).
c. The applicant shall provide sufficient evidence of adequate fire fighting
capacity.
3.
Wastewater Disposal
a. The applicant shall submit evidence of soil suitability for subsurface wastewater
disposal prepared by a Maine Licensed Site Evaluator in full compliance with
the requirements of the State of Maine Subsurface Wastewater Disposal Rules,
as amended.
b. In no instance shall a disposal area be permitted on soils or on a lot which
requires a holding tank or New System Variance from the Subsurface
Wastewater Disposal Rules.
Article 8 Performance, Requirements and Standards
91
4. Streets and Driveways
a. Proposed streets shall conform to the requirements of Article 10 of this
Ordinance. Approval of the Final Plan by the Planning Board shall not be
deemed to constitute or be evidence of acceptance by the municipality of any
street or easement.
b. All streets and driveways in the subdivision shall be so designed that they shall
provide safe vehicular travel. Entrances of new streets or driveways onto
existing or proposed streets or roads shall be at such intervals as to avoid
creating undue traffic hazards. The Planning Board may require the
construction and use of shared driveway entrances onto existing roads.
5. Sidewalks
Sidewalks and curbs shall be installed by the applicant at the discretion of the
Planning Board and at such locations as the Planning Board deems necessary. In
making its determination, the Planning Board shall consider but not be limited to
the following: density of lots, number of multi-family dwelling units, and
population.
6. Parking
For each dwelling unit, there shall be off-street parking for at least two vehicles.
For affordable housing development projects, refer to Article 8, Section 1.F.for
the applicable parking requirements.
G.
Inspection of Required Improvements
All subdivision improvements for which a performance guarantee is required by the
Planning Board and any other improvements specified by the Planning Board shall be
inspected according to the following:
1.
All roads to be proposed for Town acceptance shall be inspected according to
Article 10.
2.
All roads proposed to remain private shall be inspected according to Article 10 at
the direction of the Planning Board.
3.
All other improvements shall be inspected according to the following:
a. At least 5 days prior to commencing construction of a required improvement,
the applicant shall notify the Code Enforcement Officer in writing of the time
when he/she proposes to commence construction of such improvements, so that the
Code Enforcement Officer can arrange for inspections to assure that all municipal
specifications, requirements and conditions of approval are met during the
construction of required improvements, and to assure the satisfactory completion
of improvements required by the Planning Board.
b. If the Code Enforcement Officer or other inspecting official finds that any of the
improvements have not been constructed in accordance with the plans and
specifications filed by the applicant, the Code Enforcement Officer or other
inspecting official shall so report in writing to the Selectmen, Planning Board and
the applicant. The Town shall take any necessary steps necessary to assure
compliance with the approved plans.
c. Upon completion of all improvements, a written certification signed by a
Article 8 Performance, Requirements and Standards
92
professional engineer or other qualified professional shall be submitted to the Code
Enforcement Officer, at the expense of the applicant, certifying that all
improvements meet or exceed the design and construction requirements of this
Ordinance and the subdivision plan.
d. The applicant shall submit to the Code Enforcement Officer one copy of an as-
built plan showing the actual construction of the subdivision improvements.
H.
Common Shoreland Access
The use of any property for common shoreland access shall comply with the provisions
of this Ordinance and shall require a minimum shoreline frontage of 300 feet and an
additional 25 feet for each dwelling unit beyond the third unit using the common
shoreland access. Such a common lot shall have a minimum area of 80,000 square feet.
Any recreational facilities associated with common shoreland access, such as beaches,
docks, boat ramps, or picnic areas, shall be a minimum of 75 feet from side lot lines.
Beach construction shall conform to all applicable state and federal laws.
I.
Phasing of Development
The applicant may be required to develop a subdivision of more than 20 lots in
separate and distinct phases, subject to a schedule of development mutually agreed
upon by the Planning Board and the applicant and to any conditions the Planning
Board determines necessary to insure the orderly development of the final plan. This
may be accomplished by limiting final approval to those lots abutting that section of
the proposed subdivision's street system which is covered by performance guarantees.
The boundary lines of each phase shall be clearly shown on the final plan, and a
separate signature block shall be provided for each phase. When development is
phased, road construction shall commence from the public way. Final approval of lots
in subsequent phases shall be given only upon satisfactory completion of all
requirements pertaining to the first phase of development. In the event of a phased plan
of development, each phase receiving final approval shall be duly recorded by the
Applicant and required improvements shall at a minimum be completed within the
deadlines set forth.
J.
Rules Governing Homeowners' Associations
If any common areas, including but not limited to, open space, recreational facilities,
buildings, or roads or other rights-of-ways is to be owned, used or maintained in
common by the residents, a homeowner's association shall be formed and the
covenants of the subdivision shall specify maintenance responsibilities and shall be
submitted to the Planning Board prior to development plan approval. A homeowner's
association shall be governed according to the following regulations:
a. The association shall be established by the developer and shall commence
operation, with financial subsidization by the developer, if necessary, before the
sale of any lots within the development.
b. Membership in the association shall be mandatory for all purchasers of lots in the
development and their successors. Covenants setting forth the owners' rights and
interests and privileges in the association and the common land, shall be reviewed
by the Planning Board and included in the deed for each lot.
c. The association shall be responsible for maintenance of common open space and
property. It shall also be responsible for insurance and taxes on common open
space and property.
d. The association shall levy annual charges against all property owners to defray the
Article 8 Performance, Requirements and Standards
93
expenses connected with the maintenance of open space, other common and
recreational facilities and town assessments.
K.
Rules Governing Re-subdivisions
1. Subsequent to the approval of a revision or amendment to a previously approved
subdivision, upon payment of applicable fees, and with at least 14 day notice to
abutters or to all owners of lots in such subdivision when a lot or lots are to be
divided, the Planning Board may consider modifications to any subdivision.
2. Changes in laws or regulations, or in relevant facts, shall be stated as the reason for
any modification, and standards stated in subsection J of this section shall remain
applicable.
SECTION 18.
CLUSTER DEVELOPMENT
A. General Purpose
The purpose of these provisions is to allow for flexibility in the design of housing
developments to allow for the creation of open space which: a) provides recreational
opportunities or, b) preserves important natural features including valuable wildlife habitat,
topography, and geologic features from the adverse impacts of development, provided that
the net residential density shall be no greater than is permitted in the district in which the
development is proposed. Notwithstanding other provisions of this Ordinance relating to
dimensional requirements, the Planning Board, in reviewing and approving proposed
residential developments located in Town may modify said provisions related to dimensional
requirements to permit flexibility in approaches to housing and environmental design in
accordance with the following standards. This shall not be construed as granting variances.
B. Optional and Mandatory Cluster Development
Any subdivision which creates less than 10 lots may be designed and constructed as a cluster
subdivision; and, any subdivision which creates 10 or more lots must be designed and
constructed as a cluster subdivision. If the Planning Board determines in either case that a
cluster development will not achieve the General Purpose in paragraph A above, the Board
may require the subdivision be designed and constructed as a conventional subdivision.
C.
Application Procedure
The Planning Board may allow lots within cluster subdivisions to be reduced in area and
width below the minimum normally required by this Ordinance in return for open space
where the Planning Board determines that the benefits of the cluster approach will decrease
development costs, increase recreational opportunities or prevent the loss of natural features
without increasing the net density of the development.
At the sketch plan stage, the applicant shall submit a map showing the significant natural
features including land cover, water bodies and wetlands, soil types from the Kennebec
County Soils Survey and elevations based upon the U.S.G.S. 7.5 Minute Topographic
Quadrangle.
In addition, 2 sketch plans shall be submitted with one showing the lot layout as a
conventional subdivision and the second showing the proposed layout as a cluster
development indicating open space and significant natural features. Each lot in the
conventional subdivision shall meet the minimum lot size and lot width requirements of this
Ordinance, and all lots in either conventional or cluster subdivisions shall have at least two
Article 8 Performance, Requirements and Standards
94
suitable subsurface disposal system sites meeting first-time system requirements. The
number of buildable lots or dwelling units in the cluster subdivision shall in no case exceed
the number of lots or dwelling units in the standard subdivision.
D.
Basic Requirements for Cluster Developments
In reviewing all cluster development applications, subject to payment of applicable fees, and
with at least 14 days' notice to abutters, the following standards shall apply:
1.
Minimum Size
A cluster subdivision proposal for any number of lots shall meet all requirements for a
subdivision under this Ordinance and all other applicable municipal ordinances and
state and federal laws and regulations.
2.
Lot Requirements for Cluster Developments
In cluster subdivisions or sections of cluster subdivisions made up of single-family and
two-family and multi-family structures, individual lots may be reduced to the
following minimum requirements with regard to area, frontage, coverage and setbacks:
a.
Minimum Lot Area:
Single-Family: 20,000 square feet1
Two-Family: 30,000 square feet1
Multi-Family 10,000 square feet for each unit over 2
1. Except in the Rural District where the minimum lot area for one- and two-family
dwellings is 40,000 square feet.
b.
Minimum Lot Road Frontage:
Single-Family: 100 Feet
Two-Family: 150 feet
Multi-Family: 50 additional feet for each unit over 2
c.
Maximum lot coverage for buildings: 20%
d.
Minimum Side Setback: 20 feet
e.
Minimum Front Setback: 25 feet
f.
Minimum Rear Setback: 20 feet
g.
Minimum distance between structures: 40 feet
All of the above dimensions may be increased or decreased by a factor of 10% by the
Planning Board, if it finds such change is necessary in order to insure good site design.
The object of easing the requirements is to allow flexibility in the development of the
site. The flexibility thus allowed should result in more creative patterns of land
utilization and savings in land and public costs, compared to those possible under
conventional subdivision patterns.
3.
Site Plan
Each proposal shall have an overall plan for site development which plan shall identify
the location of all buildings, proposed roads, parking areas, footpaths, and common
open space. Only developments having a total site plan for structures will be
considered. In respect to the placement of buildings and treatment of open spaces,
paths, roads, and service and parking areas, the developer shall take into consideration
all requirements of this section and of other relevant sections of this Ordinance.
Article 8 Performance, Requirements and Standards
95
4.
Net Residential Acreage
The net residential acreage shall be calculated by taking the total of the parcel and
subtracting, in order, the following:
a.
"Land Not Suitable for Development" as defined in this section.
b.
15% of the area of the parcel to account for roads and parking.
c.
Portions of the lot which, because of existing land uses or lack of access, are
isolated and unavailable for building purposes or for use in common with the
remainder of the parcel, as determined by the Planning Board.
d.
Portions of the parcel located in the Shoreland Protection District.
e.
50% of the poorly or poorly drained soils as defined in the Kennebec County soils
survey.
f.
Portions of the parcel to be utilized for stormwater management facilities.
5.
Maximum Number of Dwelling Units
To determine the maximum number of dwelling units permitted on the parcel, the net
residential acreage shall be divided by the minimum lot size of the district in which it
is located.
6.
Total Open Space Area
Open Space tracts need not be contiguous to the proposed subdivision but should be in
accordance with the town's Open Space Plan. The total area of open space shall be a
minimum of 25% of the total parcel proposed for development, and shall equal or
exceed the sum of the areas by which any building lots are reduced below the
minimum lot size normally required. In addition, no less than 30% of the reserved open
space shall be "usable open space". "Usable open space" refers to land which due to its
topographic and drainage characteristics is suitable for use as active recreation or
agriculture, or will be improved by the development as an active recreation facility.
7.
Distance to Common Land
Each building lot that is reduced in area below the amount normally required shall be
within 1000 feet of the common land.
8.
Setback Zone
In cluster developments, no dwelling or permanent structure shall be built within 50
feet of an existing road. Within 25 feet of an existing road either a natural buffer strip
shall remain or other buffers/screening shall be provided. This screening shall
effectively screen at least 80% of the homes from view from the existing road and shall
be maintained throughout the life of the project.
Where appropriate, internal buffers shall be maintained between groups of residences
to insure proper site design and site plan development. In all buffer areas, the
conservation of land in its natural or forested condition is preferred.
9.
Vehicular Access
No individual lot or dwelling unit shall have direct vehicular access onto a public road
existing at the time of the development.
Article 8 Performance, Requirements and Standards
96
10.
Shoreland Frontage and Setback
Neither shore frontage nor shore setback shall be reduced below the minimum
normally required in the Shoreland Residential district.
11.
Shoreline Access
Where a cluster development abuts a body of water, a usable portion of the shoreline,
as well as reasonable access to it, shall be part of the common land.
12. Building Orientation
Buildings shall be oriented with respect to scenic vistas, natural landscape features,
topography, solar energy, and natural drainage areas in accordance with an overall plan
for site development.
E.
Dedication and Maintenance of Common Open Space and Facilities
1.
Dedication of Common Space
Common open space shall be dedicated upon approval of the project as a separate lot
of record in fee simple or in the transfer of that parcel's development rights.
Conveyances shall restrict this land from any further division and its use limited to
non-commercial recreation, agriculture or conservation. However, easements for public
utilities, or structures accessory to non-commercial recreation, agriculture or
conservation may be permitted.
2.
Notation of Final Approved Plan
The common open space(s) shall be shown on the final approved development plan
and with appropriate notation on the face thereof to indicate that:
a.
the common open space shall not be used for future building lots; and
b.
a part or all of the common open space may be dedicated for acceptance by the
Town or by another entity approved by the Selectmen which has indicated that it
will accept such dedication.
3.
Ownership of Open Space
If the common open space areas are not dedicated and accepted by the Town or by
another entity approved by the Selectmen, the developer shall indicate whether these
areas shall be owned, in part or totally, by the residents or retained by the developer.
4.
Retention of Open Space by Developer
If any or all of the common open space is retained by the developer, the developer shall
make provisions for permanent maintenance of open space areas. The Planning Board
shall approve such provisions when it is satisfied that the provisions, proposed by the
developer, will result in the open space continuing as such and being properly
maintained. No building permit shall be issued until the approval of the Planning
Board has been given to the maintenance plan for the common open space.
Article 8 Performance, Requirements and Standards
97
5.
Rules Governing Homeowner's Associations
If any or all open space is to be reserved for ownership by the residents, a homeowner's
association shall be formed and the by-laws of the proposed homeowner's association
shall specify maintenance responsibilities and shall be submitted to the Planning Board
prior to development plan approval. No building permit shall be issued until the
Planning Board has approved the homeowner's association by-laws and the common
open space and facilities maintenance plan. A homeowner's association shall be
governed according to the following regulations:
a.
The association shall be established by the developer and shall commence
operation, with financial subsidization by the developer, if necessary, before the
sale of any lots within the development.
b.
Membership in the association shall be mandatory for all purchasers of lots in the
development and their successors. Covenants setting forth the owner's rights and
interests and privileges in the association and the common land, shall be reviewed
by the Planning Board and included in the deed for each lot.
c.
The association shall be responsible for maintenance of common open space and
property. The association shall also be responsible for insurance and taxes on
common open space and property.
d.
The association shall levy annual charges against all property owners to defray
the expenses connected with the maintenance of open space, other common and
recreational facilities and town assessments.
e.
The association shall have or hire adequate staff to administer common facilities
and maintain the common open space.
SECTION 19. MOBILE HOME PARKS
A. Mobile Home Park Review
All mobile home parks shall be considered a subdivision and shall conform to all standards
applicable to a subdivision except for those specific standards contained in this section.
B. Existing Mobile Home Park
A mobile home park legally in existence at the time of adoption of this Ordinance shall
continue as a legal use, and may be expanded or enlarged in conformance with this section.
C. Limitation on Units
No dwelling unit other than a mobile home shall be located within the park.
D.
Modifications
A mobile home park shall not be converted into another use or be expanded without Site
Review approval. Mobile home parks shall not be converted into a conventional subdivision
unless all the applicable Ordinance standards are met.
E.
Unified Ownership
The land within the mobile home park shall remain in unified ownership and the fee to the
lots or portions of the lots shall not be transferred.
Article 8 Performance, Requirements and Standards
98
F.
Minimum Design and Performance Standards
1.
Lot Size, Width, and Density
Lots in a mobile home park shall meet the following lot size, width, and density
requirements:
a.
Lots served by individual subsurface sewage disposal system.
Minimum lot area - 20,000 square feet
Minimum lot width - 100 feet
Minimum lot frontage - 100 feet
b.
Lots served by a central subsurface wastewater disposal system.
Minimum lot area - 12,000 square feet
Minimum lot width - 75 feet
Minimum lot frontage - 75 feet
c.
The overall density of a mobile home park served by a central subsurface sewage
disposal system shall be no greater than one unit per 20,000 square feet of total
park area.
d.
Lots shall be measured in a straight line between the intersection of the side lot
lines and the front lot line. Where lots front on a curved right-of-way or are
served by a driveway, the frontage requirement shall be measured in a straight
line perpendicular to the front of the mobile home.
e.
The overall area of the mobile home park shall be the combined area of its mobile
home lots plus:
(1) the area required for road rights-of-way;
(2) the area required for buffer strips, if any; and
(3) the area within the municipality's shoreland setback.
2.
Lot Setbacks
a.
The following lot setbacks shall apply to all mobile homes and accessory
buildings:
Front setback: 20 feet
Side setback: 20 feet
Rear setback: 10 feet
b.
A minimum 20 foot separation shall be maintained between all mobile homes in
all directions.
c.
The Planning Board may allow lot side yard setbacks to be reduced to 5 feet
provided a distance of 20 feet is maintained between the units for the purpose of
providing more usable yard space on one side of the home.
d.
So as to avoid monotony and sameness, the Planning Board may allow the front
yard setback on a private road within a mobile home park to be varied provided
that no home may be closer than 10 feet from the right-of-way and the average
distance is at least 20 feet for all units.
3.
Lot Coverage
All buildings on the lot, including accessory buildings and structures, but excluding
open decks and parking spaces, shall not cover more than 50% of the lot area.
4.
Buffer Strips
a.
A 50 foot wide buffer strip shall be provided along all property boundaries that:
(1) Abut residential land which has gross density of less than half of that
proposed in the park, or
Article 8 Performance, Requirements and Standards
99
(2) Abut residential land that is zoned at a density of less than half of that
proposed in the park. Further, no structures, streets or utilities shall be placed
in the buffer strip except that they may cross a buffer to provide services to
the park.
(a)
Within 25 feet of any property line and within the buffer strip, visual
screening and/or landscaping shall be provided. The visual screening
may consist of fences, berms, landscaping (such as shrubs and trees)
and/or natural existing vegetation. This screening shall effectively
screen at least 80% of the homes from the adjacent property and shall
be maintained throughout the life of the project.
5.
Fire Protection
Each lot shall be legibly marked for identification and easily accessible to emergency
vehicles, permitting fire apparatus to approach within 100 feet.
6.
Park Administration
The owner or operator of a mobile home park shall be responsible for ensuring the
maintenance of all structures and their sites. Park management shall conform to state
laws. Compliance with this Ordinance shall not exempt the park owner, developer, or
manager from complying with other applicable local, state and federal codes and
regulations.
7.
Parking Requirements
a. For each mobile home lot there shall be provided and maintained at least 2 off-
street parking spaces.
b. Each parking space shall contain a minimum of 200 square feet with minimum
dimensions of 10 by 20 feet. This requirement may be waived if a parking lane is
provided.
8.
Refuse Disposal
The storage, collection and disposal of refuse in the mobile home park shall be so
conducted as to create no health hazards, rodent harborage, insect breeding areas,
accident or fire hazards, or air pollution.
9.
Road Standards
a. Road Design Standards
(1) Private Roads. Privately owned roads within the mobile home park shall be
designed by a professional engineer, registered in the State of Maine, and
shall be built according to accepted engineering standards.
(2) Roads for Public Acceptance. Roads within mobile home parks which are to
be offered for acceptance by the Town shall conform to the requirements of
Readfield's Ordinance Relating to Acceptance of New Town Roads.
(3) Intersection with Public Roads.
Mobile home park roads which intersect with public roads shall meet the
following standards:
(a)
Angle of Intersection. The desired angle of intersection shall be 90
degrees. The minimum angle of intersection shall be 75 degrees.
(b)
Grade. The maximum permissible grade within 75 feet of the
Article 8 Performance, Requirements and Standards
100
intersection shall be 2%.
(c)
Minimum Sight Distance. The minimum sight distance shall be 10
times the posted speed limit on the existing road. Sight distance shall
be measured from the driver's seat of a vehicle that is 10 feet behind
the curb or edge of shoulder line with the height of the eye 3 ½ feet
above the pavement and the height of object 4 ½ feet. Where
necessary, the park land bordering the intersection shall be cleared of
all growth and sight obstructions to achieve the required visibility.
b. Access and Circulation
(1) The layout and general development plan for major and minor access streets
and driveways within the mobile home park, together with the location and
way, shall be approved by the Planning Board.
(2) A traffic impact analysis shall be required if the park will generate more than
500 trips/day.
(3) For mobile home parks expected to generate 200 trips per day or more, there
shall be at least two entrances from public streets or roads.
(4) On-street parking within the park shall be prohibited unless an eight foot
dimensions of access junctions with existing public streets and rights-of-
parking lane is provided in which case on-street parking may be permitted
on the side of the road where the parking lane is located.
(a) Curvilinear streets shall be utilized wherever possible. No street within
the park shall be more than 200 feet without a curve or bend.
(b) No mobile home lot may have vehicular access directly onto an
arterial street.
c.
Right-of-way and Pavement Width
(1) Two-way park roads shall have a minimum right-of-way of 23 feet and a
minimum paved surface of 20 feet. On-street parking shall be prohibited.
(2) One-way streets shall have a minimum right-of-way of 18 feet and a
minimum paved surface of 14 feet. On-street parking shall be prohibited.
(3) Parking lanes shall be a minimum of 8 feet in width, if provided.
(4) Cul-de-sac turnarounds shall have a minimum radius of 50 feet at the outer
edge of the pavement, exclusive of any parking areas.
d.
Entrances
The main entrance to the mobile home park shall be from a State, State-Aid
Highway or Town Road.
e.
Water Supply
An adequate and potable supply of water with a minimum of 30 pounds per
square inch of pressure at all times shall be provided for each mobile home lot.
The water source shall be capable of producing 300 gallons of potable water per
mobile home lot per day from a source approved by the Code Enforcement
Officer of the Town of Readfield.
f.
Storage
At least 300 cubic feet of enclosed tenant storage facilities shall be conveniently
provided near each mobile home lot for the storage of materials and equipment.
Article 8 Performance, Requirements and Standards
101
g.
Records
(1) Each permittee shall keep a written record, subject to inspection at any
reasonable time by a duly authorized officer of the Town of Readfield,
which shall contain the date of arrival, the name, make, year, model, serial
number and length of each mobile home, and also the names of the
occupants thereof. A complete list of the above shall be furnished to the
Assessor's Office no later than April 1 of each year.
(2) The permittee shall be responsible for notifying the Town Assessor of the
arrival or impending departure of any occupied mobile home or change of
ownership that occurs within the park.
SECTION 20. MINING AND MINERAL EXTRACTION
A.
Applicability
These provisions apply to any activity defined in Article 11 of this Ordinance as mining or
mineral extraction and shall be interpreted under the standards established in 38 MRSA,
490-A to 490-M and Section 484-A of the Site Location of Development Law, administered
by the Department of Environmental Protection. Site Review for mining and mineral
extraction where permitted shall be required for any excavation area, whether alone or in
combination, which is:
1. greater than 10,000 square feet or where more than 500 cubic yards of material are
removed and not located within any Shoreland District, or
2. within any Shoreland District for an area greater than 100 square feet or where more
than 100 cubic yards of material are removed.
B.
Standards
1.
Significant wildlife habitat. Affected land may not be located in a significant wildlife
habitat or in an area listed pursuant to the State Natural Areas Program.
2. Solid waste. Solid waste, including stumps, wood waste and land clearing debris
generated on the affected land shall be disposed of in accordance with 38 MRSA, 1301
including any rules adopted to implement those laws.
3.
Groundwater protection. Excavation shall not occur within 5 feet of the seasonal high
water table. A benchmark sufficient to verify the location of the seasonal high water
table must be established and at least one test pit or monitoring well shall be
established on each 5 acres of unclaimed land.
a.
A 200-foot separation shall be maintained between any excavation and any
private drinking water supply that is point-driven or dug well and was in existence
prior to that excavation.
b. A 100-foot separation shall be maintained between any excavation and any
private drinking water supply that is drilled into saturated bedrock and was in
existence prior to that excavation.
c.
Separation shall be maintained between any excavation and any public drinking
water source as follows:
(1) For systems serving a population of 500 persons or less, the minimum
separation shall be 300 feet.
(2) For systems serving a population of 501 persons up to 1,000 persons, the
separation shall be 500 feet;
(3) For systems serving a population of more than 1,000 persons, the separation
Article 8 Performance, Requirements and Standards
102
shall be 1,000 feet; and
(4) For any system that holds a valid filtration waiver in accordance with the
Federal Safe Drinking Water Act, the separation shall be 1,000 feet.
d.
Refueling operations, oil changes and other maintenance activities requiring the
handling of fuels, petroleum products, hydraulic fluids, and other on-site activity
involving the storage or use of products that if spilled, may contaminate
groundwater, shall be conducted in accordance with the spill prevention, control
and countermeasures plan of the Maine Department of Environmental Protection.
Petroleum products and other substances that may contaminate groundwater shall
be stored and handled over impervious surfaces that are designed to contain spills.
The spill prevention, control and countermeasures plan shall be posted at the site.
4.
Natural buffer strip. Existing vegetation within a natural buffer strip may not be
removed. If vegetation within the natural buffer strip has been removed or disturbed by
the excavation or activities related to the excavation before submission of a notice of
intent to comply, that vegetation shall be reestablished as soon as practicable after
filing the notice of intent to comply.
5. Protected natural resources. A natural buffer strip shall be maintained between the
working edge of an excavation and a river, stream, brook, or great pond as defined in
MRSA 38, section 480-B. A natural buffer strip shall also be maintained between the
working edge of an excavation and certain freshwater wetlands. Excavation activities
conducted within 100 feet of a protected natural resource shall comply with the
applicable permit requirements of this Ordinance. The width requirements for natural
buffer strips are as follows.
a.
A natural buffer strip at least 100 feet wide shall be maintained between the
working edge of the excavation and the normal high water line of a great pond
classified as GPA.
b
A natural buffer strip at least 75 feet wide shall be maintained between the
working edge of the excavation and any other water body, river, stream, brook, or
significant wildlife habitat contained within a freshwater wetland or a freshwater
wetland consisting of or containing:
(1) Under normal circumstances, at least 20,000 square feet of aquatic
vegetation, emergent marsh vegetation or open water, except for artificial
ponds or impoundments; or
(2) Peat lands dominated by shrubs, sedges and sphagnum moss.
For purposes of this subsection, the width of a natural buffer strip is measured
from the upland edge of floodplain wetlands; if no floodplain wetlands are
present, the width of the natural buffer strip is measured from the normal high
water mark of a great pond, river, stream or brook or the upland edge of a
freshwater wetland. The Planning Board shall not grant a waiver from this
subsection.
c.
A natural buffer strip at least 100 feet wide shall be maintained between the
working edge of an excavation and the right of way line of any public road. A
natural strip at least 24 feet wide shall be maintained between the working edge of
a topsoil excavation and any public road.
d.
A natural buffer strip at least 50 feet wide shall be maintained between the
working edge of an excavation and any private road or right-of-way. If a private
road is contained within a wider right-of-way, the buffer shall be measured from
Article 8 Performance, Requirements and Standards
103
the edge of the right-of-way. The width of the natural buffer strip adjacent to a
private road may be reduced if the applicant receives written permission from the
person or persons having a right-of-way over the private road.
A distance specified in this subsection shall be measured from the outside edge of the
shoulder of the road unless otherwise specifically provided.
6.
Property boundary. A natural buffer strip at least 50 feet wide shall be maintained
between any excavation and any property boundary. A natural buffer strip at least 25
feet wide shall be maintained between any topsoil excavation and a property boundary.
These distances may be reduced to not less than 10 feet with the written permission of
the affected property owner or owners, except that the distance may not be reduced to
less than 25 feet from the boundary of a cemetery or burial ground. The buffer strip
between excavations owned by abutting property owners may be eliminated with the
abutter's written permission provided the elimination of this buffer strip does not
increase the runoff from either excavation across the property boundary. All property
boundaries shall be identified in the field by markings such as metal posts, stakes,
flagging or blazed trees.
7.
Erosion and sedimentation control. All reclaimed and un-reclaimed areas, except for
access roads, shall be naturally internally drained at all times unless a variance is
obtained from the Department of Environmental Protection (DEP).
a.
The area of a working pit shall not exceed 10 acres.
b. Stockpiles consisting of topsoil to be used for reclamation shall be seeded,
mulched or otherwise temporarily stabilized.
c. Sediment shall not leave the parcel or enter a protected natural resource.
d. Grubbed areas not internally drained shall be stabilized.
e. Erosion and sedimentation control for access roads shall be conducted in
accordance with DEP's best management practices for erosion and sedimentation
control.
8.
Surface water protection and stormwater management. Surface water discharges from
areas not required to be naturally internally drained shall not be increased as a result of
stormwater runoff from storms up to a level of intensity of a 25-year, 24-hour storm.
Structures such as detention ponds, retention ponds and undersized culverts shall not
be used to meet this standard unless a variance is obtained from DEP.
Grading or other construction activity on the site shall not alter drainage ways such that
the drainage, other than that which occurred before the development, adversely affects
an adjacent parcel of land or that any drainage ways flowing from an adjacent parcel of
land to the parcel are impeded.
9. Noise. Noise levels shall not exceed applicable noise limits in rules adopted by the
Board of Environmental Protection.
10. Dust. Dust generated by activities at the excavation site, including dust associated
with traffic to and from the excavation site, shall be controlled by sweeping, paving,
watering or other best management practices for control of fugitive emissions. Dust
control methods may include the application of calcium chloride, providing the
manufacturer's labeling guidelines are followed.
11. Reclamation. A reclamation plan for the site shall be filed at the time of initial permit.
The affected land shall be restored to a condition that is similar to or compatible with
Article 8 Performance, Requirements and Standards
104
the conditions that existed before excavation. Reclamation shall be conducted in
accordance with the best management practices for erosion and sediment control.
The reclamation plan shall be installed by the applicant within 12 months following the
completion of operations at any site which operations shall be deemed complete when
less than 100 cubic yards of materials are removed within any consecutive 12 month
period.
a. Re-grading side slopes to a slope no steeper than 2 1/2 horizontal feet for each
vertical foot;
b. Establishing a vegetative cover by seeding within one year of the completion of
excavation. Vegetative cover shall be acceptable within one year of seeding;
(1) The planting of trees and shrubs shall result in a permanent stand or a stand
capable of regeneration and succession, sufficient to ensure a 75% survival
rate; and
(2) The planting of all materials shall result in permanent 90% ground coverage;
c. Removing all structures and, once no longer in use, reclaiming all access roads,
haul roads and other support roads;
d. Reclaiming all affected lands within 2 years after final grading; and
e.
Stockpiling soil that is stripped or removed for use in reclaiming disturbed land
areas.
SECTION 21. CAMPGROUNDS AND INDIVIDUAL PRIVATE CAMPSITES
A. Purpose
The purpose of this section of this Ordinance is to ensure that campgrounds are developed
consistent with the rural character of the community and that the public health, welfare and safety
will be protected. Campgrounds can fit very well into the character of a rural community and
create tax revenue and new employment.
B. Review Criteria
The Planning Board shall consider the following criteria and before granting approval shall
determine that:
1. The campground proposal complies with all of the submission requirements contained
in Article 8, Section 20, of the Land Use Ordinance.
a. Campgrounds with less than 50 sites shall comply with the submission requirements
for minor subdivisions;
b. Campgrounds with 50 or more sites shall comply with the submission requirements
for major subdivisions.
2. The campground proposal conforms with the performance standards contained in this
section of this Ordinance and with the site review criteria in Article 6, Section 3.
C. Performance Standards
1. Applicability
The performance standards contained in this section shall apply to all campgrounds.
Article 8 Performance, Requirements and Standards
105
2. Minimum Land Area Requirements
All campgrounds shall have a minimum of 5 acres of land that are defined as suitable
for development. Land suitable for development shall be calculated by using the
following method:
a. Calculate the total number of acres within the campground proposal.
b. Calculate the total number of acres of land not suited for development consisting
of the following:
1) all wetlands, (excluding forested wetlands);
2) all areas in resource protection zones;
3)
all streams, stream tributaries, brooks, lakes, and ponds (measured from
the normal high-water line);
4)
all areas designated as significant wildlife habitat as identified by the
Department of Inland Fisheries and Wildlife;
5)
all structures and sites listed on the National Register of Historic Places or
any archeological site identified by the State Historic Preservation
Commission;
6)
all sites designated by the Town as significant scenic vistas or areas, and,
7)
the total area within the campground set aside for roads and parking areas.
c. Subtract the total number of acres of land not suited for development from the
total number of acres within the campground. The result will be the land area
suitable for development.
Please note: Wetlands shall be measured to include the upland edge of the wetland.
Streams, stream tributaries, brooks, lakes, and ponds shall be measured to include an area
extending at least 25 feet beyond the normal high waterline of these waterbodies.
Land designated as not suitable for development may not contain any buildings, structures or other
impervious areas; however, footpaths may be allowed subject to Planning Board approval.
The overall density of camp sites within the campground shall be calculated by dividing the
number of acres of land suited for development by the particular type of camp site proposed for the
development.
If the campground includes any dwellings proposed for the owners or staff, these dwellings shall
conform to the Town's minimum lot size and other dimensional requirements. The land area
required for these structures shall also be deducted from the area of the campground considered
suitable for development.
These dwelling units shall be considered as part of the campground and subject to the requirements
and limitations placed upon the ownership and transfer of ownership of the campground.
Article 8 Performance, Requirements and Standards
106
3.
Minimum Dimensional and Density Requirements
All campground sites shall conform to the following minimum dimensional and density
requirements:
Tent sites
RV sites
Housekeeping
non-housekeeping
sites
Minimum land
area required per
site
3,000 square feet
5,000 square feet
7,000 square feet
5,000 square feet
in shoreland zone
Maximum
building square
footage
N/A
N/A
600 square feet
(per unit)
Maximum # of
tents/persons
allowed per site
2 tents or 6
persons
whichever is less
1
1
Maximum # of
RV's per site
0
1
0
Minimum setback
from property line
100 feet
100 feet
100 feet
Minimum setback
from: lakes and
ponds;
From: non-
forested wetlands;
From all other
waterbodies;
100 feet from
normal high-water
line
75 feet from
upland edge
75 feet from
normal high-water
line
100 feet
75 feet from
upland edge
75 feet from
normal high-water
line
100 feet
75 feet from
upland edge
75 feet from
normal high-water
line
Minimum vehicle
parking area per
campsite
(on or off-
campsite)
200 square feet
200 square feet
200 square feet
Please Note: Only tent sites and RV sites are permitted in the Shoreland Zone with a minimum
density of 5,000 square feet per site. Any other type of structure shall be required to comply with
the minimum lot size and other dimensional requirements specified for a dwelling or other type of
buildings as further described in Sections 24.C.2.a.5 and E.
Article 8 Performance, Requirements and Standards
107
4.
Site Requirements
Each camp site shall comply with the more restrictive of the following requirements or the
requirements of the State of Maine, Department of Human Services, regulations for Tent and
Recreational Vehicle Parks and Wilderness Recreational Parks, Chapter 205, or as later revised;
SITE FEATURE
REQUIREMENT
Picnic Table1
1 per site
Trash container (minimum 30 gallon size)1
1 per 4 sites1,2
Potable water supply1
1 per 12 sites2
Outside fire pit or similar structure
1 per site
Public telephone1
1 per 24 sites2
Fire extinguisher1
1 per 6 sites2
Electrical connection1
1 per each RV site
Privy
2 per each 12 sites2
Toilet1
2 per each 12 sites2
(1 for men, 1 for women)
Lavatory sink1
2 per each 12 sites2
Shower stall1
2 per 12 sites2 (1 for men, 1 for women)
Site identification marker
Each site shall be provided with a site marker
Road names
Each camp road shall be named and marked
Site map showing all roads and individual sites
2 required - one shall be located within the
immediate proximity of the main campground
entrance and one supplied annually to the Fire
Department
Campground entrance signs
Not to exceed those permitted under Article 8,
Section 14
Lighting fixtures (maximum height 16 feet)1
A light fixture in compliance with Article 8
Section 15, is required at the following locations:
main entrance, site maps, public telephones,
restrooms, bathhouses and administrative office
Buffers/Screening
Each campsite shall be completely screened by
natural or proposed vegetation from the property
lines
Common buildings and structures setbacks
Minimum setback from property lines is 100
feet
Recreational areas setbacks
Minimum setback from property lines is 100 feet
1 not required for Wilderness Park Campgrounds 2 ...or fraction thereof
Article 8 Performance, Requirements and Standards
108
D. General Requirements
1. All campgrounds shall comply with the minimum requirements imposed under the State
of Maine licensing procedures.
2. All campgrounds shall comply with the State of Maine Subsurface Wastewater Disposal
Rules.
a. All campgrounds shall develop Rules for the operation and maintenance of the
facilities and shall address the following:
(1) Collection, recycling and disposal of all solid waste;
(2) Fire protection;
(3) Noise;
(4) Access to emergency services including police, fire and ambulance;
(5) Road maintenance;
(6) Stormwater and erosion;
(7) Disposal of black and gray waste from all RV's; and
(8) Maintenance of all potable water supply and sanitary facilities.
3. No mobile home shall be permitted within any campground temporarily or otherwise.
Recreational vehicles shall be permitted only on sites designated for their use.
4. All campgrounds that provide RV sites shall provide a connection for black and gray
waste at each site or a central facility for disposing of the effluent stored in the RV.
E. Common Buildings and Related Structures
Common buildings and structures including maintenance buildings, recreational structures,
administrative offices, dining halls, recreational buildings and structures, service and sanitary
structures, convenience stores/facilities and similar structures are not subject to density or
minimum lot size requirements if they conform to all of the following:
1. The structures or buildings are for the primary use of the campground residents.
2. The total square footage of all buildings and structures does not exceed 10% of the land
area deemed suitable for development.
3. All buildings and structures are setback at least 100 feet from all property lines.
4. All buildings and structures are completely screened from the view of all property lines
by existing or proposed vegetation.
5. All new buildings and structures meet setbacks requirements from waterbodies,
tributary streams and wetlands.
6. Any buildings or structures that do not conform to these standards shall meet the
requirements contained in Article 7, Section 6 (Table 2).
F. Recreational Areas
1. Development areas which are provided for the primary use of campground residents are
not subject to density requirements. All recreational areas shall be setback at least 100 feet
from all property lines and shall be completely screened from the view of all property
lines. The only exception shall be swimming areas, beaches, footpaths and picnic areas
located along a shorefront, however, any structures within these areas shall be setback at
least 100 feet from the normal high water line.
2. Campground owners shall, whenever possible, provide access to existing recreational and
natural resources such as rivers, streams, trails, etc. from the campground by connecting
trails or footpaths.
G. Roads, Parking and Traffic Access
1. All roads within the campground shall conform to the standards contained in Article 10
Article 8 Performance, Requirements and Standards
109
and Appendix A for private roads except that a minimum right-of-way is not required and
the traveled surface of one-way roads may be a minimum of 10 feet in width with 2 foot
shoulders.
2. Roads shall be designed to allow for the safe passage of recreational vehicles, vehicles
towing campers and other types of trailers and emergency vehicles such as fire,
ambulance and police.
3. The campground entrance road shall be paved for a minimum distance of 50 feet as
measured from the intersection with any paved road.
4. Applicants may design campground roads as loops or as dead-end roads; however, dead-
end roads shall be designed and constructed with turn-arounds to accommodate RVs and
emergency (fire, rescue, police) vehicles.
5. Parking shall not be permitted on any campground road or shoulder.
6. A common or other parking area(s) shall be provided to accommodate extra vehicles and
guests. The minimum number of spaces required in the parking area shall be not less than
one parking space per each 4 camp-sites. The Planning Board may require additional
parking spaces depending upon the design, expected occupancy and general public access
allowed to the campground.
Campground owners are encouraged to limit the number of vehicles allowed at each
campsite in order to maintain the rural atmosphere of the site.
Campgrounds that permit more than one vehicle to be parked at each campsite shall
provide additional parking areas at each site of a minimum of 200 square feet.
7. Camp roads shall be posted with a speed limit of 10 mph and be designed to allow the safe
passage of pedestrians whenever separate walking areas or footpaths are not provided to
accommodate camp residents.
8. All roads shall be designed and constructed to employ both temporary and permanent Best
Management Practices techniques for erosion and sedimentation control as referenced in
Article 8, Section 11.
H. Fire Protection
1. Camp fires shall be permitted only within designated fire pits, fireplaces or similar
structures. Trees and other vegetation shall be removed or cut-back a suitable distance
from all designated camp fire sites.
2. Campgrounds are responsible for providing all fire protection measures deemed necessary
by the Planning Board in consultation with the Fire Chief. Applicants shall request that
the Fire Chief review the campground proposal. The Fire Chief shall submit his/her
recommendations concerning fire protection measures both to the Planning Board and the
applicant in writing The recommendations may include provisions for fire ponds, dry
hydrants, road design, road access, camp fire structures and locations, campground rules
and emergency notification.
I. Individual Private Campsites
Individual private campsites not associated with campgrounds are permitted provided the
following conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or 30,000 square feet
of lot area, whichever is less, may be permitted.
2. Campsite placement on any lot, including the area intended for a recreational vehicle or
tent platform, shall be set back at least 100 feet from the normal high-water line of a great
Article 8 Performance, Requirements and Standards
110
pond and at least 75 feet from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland.
3. Only one recreational vehicle shall be permitted on a campsite. The recreational vehicle
shall not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
4. The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter
in the Shoreland Zone shall be limited to 1000 square feet.
5. A written subsurface wastewater disposal plan describing the proposed method and
location of each disposal area shall be required for each campsite and shall be approved
by the Local Plumbing Inspector. Where disposal is off-site, written authorization from
the receiving facility or land-owner shall be required.
6. When a recreational vehicle, tent or similar shelter is placed on-site for more than 120
days per year, all requirements for residential structures shall be met, including the
installation of a subsurface sewage disposal system in compliance with the State of
Maine Subsurface Wastewater Disposal Rules unless served by public sewage facilities.
J. Solid Waste
1. All campground operations shall comply with the Readfield Waste Disposal and
Recycling Ordinance. The applicant shall submit for approval by the Planning Board a
solid waste disposal and recycling plan subject to review and comment by the Readfield
and Wayne Transfer Station and Recycling Committee.
2. All refuse shall be collected from each trash container at least once in any 24-hour period.
3. Storage areas for all refuse and other solid wastes and their containers shall be enclosed,
covered and not visible to ordinary view.
4. All refuse and other solid waste shall be collected, stored and transported in such a
manner and with such frequency as to protect against odor, infestation of insects, rodents
and other vermin and any other nuisance conditions which are inconsistent with the
health, safety and welfare of the campers or other patrons or abutters of the property.
K. Inspections
An annual inspection may be conducted during the operational season of a campground to
ensure continuing compliance with this Ordinance. An appropriate inspection fee established
by the Board of Selectmen may be charged.
L. Definitions
Campground: An area or tract of land under unified ownership on which accommodations
for three or more parties for temporary occupancy are located or may be placed, including,
tents, recreational vehicles and recreational facilities and which is primarily used for
recreational purposes and retains an open air or natural character.
Campsite: The only type of dwelling or site permitted within a campground for occupancy
and consisting of one of the following: tent site, RV site, housekeeping cabin or non-
housekeeping cabin.
Campground Density: The number of campsites permitted per acre of land deemed
suitable for development.
Housekeeping Cabin: A single structure where sleeping accommodations, kitchen
facilities and which may include a toilet, a lavatory and a shower is furnished to the public
for temporary occupancy.
Article 8 Performance, Requirements and Standards
111
Individual Private Campsite: An area of land which is not associated with a campground,
but which is developed for repeated camping by only one group not to exceed ten
individuals and which involves site improvements which may include but not be limited to
a gravel pad, a parking area, a fire place, or a tent platform.
Non-Housekeeping Cabin: A single structure where sleeping accommodations are
furnished to the public for temporary occupancy. These structures shall not include kitchen
facilities or toilet facilities.
Recreational Area: All areas developed for activities such as, but not limited to, beaches,
tennis, basketball, or volleyball courts, swimming pools, outdoor theaters, softball fields,
etc.
Recreational Vehicle Site: An area of the campground designed for the placement of a
Recreational Vehicle.
Recreational Vehicle: See definition, Article 11.
Temporary Occupancy: The use of a campsite for a limited duration including a day,
week, month or a season.
Tent Site: An area of the campground designed for the placement of a tent and/or a pop-up
camper.
Wilderness Park Campground: A campground, or designated area of a campground for
which the development requirements have been reduced to provide a more rustic outdoor
camping experience. A Wilderness Park Campground shall:
1. be limited to the development of tent sites only with a minimum density of 10,000 sq.
ft. for each site
2. be limited to the use of pit, vault, composting or portable toilets only
3. require that all solid waste be carried off-premises by the campsite tenants
4. not permit on-site parking except for handicapped accessible parking
5. require any campground that contains a designated wilderness campground area must
ensure that the non-wilderness campground has facilities, e.g. toilets, showers, etc. sized
to accommodate campers who may camp in the designated wilderness area.
SECTION 22. JUNKYARDS, AUTOMOBILE GRAVEYARDS & AUTOMOBILE
RECYCLING
A. Any new, expanding or change in use of an automobile graveyard, junkyard or
automobile recycling business shall receive Site Plan Review approval from the Planning
Board prior to obtaining the required permit from the Board of Selectmen.
B. As used in this section, the terms "automobile graveyard", "junkyard" and "automobile
recycling business" are to be defined as set forth in state law, currently codified at 30-A
M.R.S.A. 3752-59.
C. All automobile graveyard, junkyard and automobile recycling businesses which seek a
site plan review approval shall meet all requirements of State and Federal laws and
regulations, and shall not be located within:
1. 100 feet of any waterbody, tributary stream or forested or non-forested wetland;
2. 300 feet of any mapped sand/gravel aquifer;
Article 8 Performance, Requirements and Standards
112
3. 100 feet of any lot or parcel with one or more common boundaries or points and
shall be kept entirely screened from ordinary view. Screening from ordinary view
shall comply with the minimum standards of the rules and recommendations
adopted by the Department of Transportation, pursuant to 30-A M.R.S.A. 3759;
4. 300 feet or ordinary view of a public facility, whichever is greater;
5. Any area of a Public Water Supply Source Protection Area as identified and
mapped by the Department of Human Services, Division of Health Engineering.
D. Pursuant to 30-A M.R.S.A. §3752(1)(A)(2), the area used by an "automobile hobbyist"
as defined in subsection E, to store, organize, restore, or display vehicles is not an
"automobile graveyard" and is not subject to the requirements for automobile graveyards.
All existing and new automobile hobbyist however, must, on an annual basis, apply for and
obtain a permit from the Code Enforcement Officer and demonstrate compliance with the
following requirements:
1. An automobile hobbyist may not store vehicles in an outdoor area within 1,000
feet of the right-of-way of any highway incorporated in both the Interstate System
and Primary System or within 600 feet of the right-of-way of any other road or
within 100 feet of any abutting lot or parcel with one or more common
boundaries or points except for those areas used by an automobile hobbyist that
are kept entirely screened from ordinary view from the highway and abutting lots
at all times by natural objects, plantings or fences. Screening required by this
paragraph must be:
a) at a height, density and depth sufficient to accomplish complete year-round
screening from ordinary view;
b) well-constructed and properly maintained at a minimum height of six (6) feet;
c) placed outside the road right-of-way; and
d) acceptable to the Municipal Officers.
2. All fluids, including, but not limited to, engine lubricant, transmission fluid,
brake fluid, power steering fluid, hydraulic fluid, engine coolant, gasoline, diesel
fuel and oil, must be properly handled in such a manner that they do not leak,
flow or discharge into or onto the ground or into a body of water;
3. A vehicle containing fluids may not be stored or dismantled within 100 feet of
any body of water or freshwater wetland, as defined by Title 38, §436-A, §§5;
4. Junk, scrap metal, vehicles or other solid wastes may not be placed or deposited,
directly or indirectly, into the inland waters or on the ice of inland waters or on
the banks of inland waters in such a manner they may fall or be washed into these
waters.
In making application for an automobile hobbyist permit, the owner or operator
must provide notice to the Town of all vehicles or parts of vehicles claimed to fall
under the hobbyist exception, including the make, model, year and color of all
vehicles or vehicle parts, the date the vehicle or part was acquired, the identity of
the project to which the part or vehicle applies; the date the project was
commenced if not complete; and if not complete, the estimated percentage of the
project that is complete.
Article 8 Performance, Requirements and Standards
113
E. "Automobile Hobbyist" as used in this Ordinance means a person who:
1.
collects and actively restores antique autos, antique motorcycles, classic vehicles,
horseless carriages, reconstructed vehicles and street rods as those vehicles are
defined in Title 29-AM.R.S.A. §101;
2.
does not store at any time more than two separate makes and models of vehicles,
and parts associated with those vehicles;
3.
completes restoration of vehicles within 12 months of acquisition or stores the
vehicles and associated parts in a fully-enclosed building; and,
4.
is not primarily engaged in the business of selling the vehicles or parts from those
vehicles.
F. All automobile graveyards, junkyards and automobile hobbyist permits issued by the Select
Board or the Code Enforcement Officer are valid for a period of 12 months and must be renewed
annually. All existing and new automobile graveyards, junkyards and automobile hobbyists are
required to obtain operating permits from the Town annually.
SECTION 23. AGRICULTURE
A. All agricultural activities located within the Shoreland District shall comply with the
standards set forth in Article 8, section 19.L in addition to any applicable standards
otherwise set forth in this Section.
B. Animal Husbandry:
1. All livestock shall be contained within fences or barriers adequately constructed and
maintained to prevent such livestock from escaping the confined area or otherwise
damaging abutting property.
a) Except in the Rural District, new livestock fencing on lots of less than 80,000
square feet in area is subject to the same side and rear setbacks as for
structures.
2. Commercial confinement feeding operations are subject to Site Review of Article
6, Section 3 of this Ordinance.
C. Marijuana Cultivation - In addition to any requirements that the Planning Board may
impose as part of any required Site Review, all marijuana cultivation ("cultivation")
must, at a minimum, meet all applicable requirements of state law and regulations, and
must meet the performance standards of this subsection. All marijuana cultivation in
an area that is equal to/or greater than 250 square feet must take place in a fully
enclosed, weathertight structure.
1. Indoor and/or outdoor combined cultivation area of equal to/or less than 250 square
feet:
a. Cultivation may not take place within 20 feet of any lot line, unless the abutting lot
is under common ownership; and,
b. Signage may not be posted either on or off the premises that may identify the site
to the public as a marijuana cultivation location.
Article 8 Performance, Requirements and Standards
114
2. Indoor cultivation area of 250 square feet or equal to/or greater:
a. Cultivation may not take place within 75 feet of any lot line;
b. Sites used for cultivation must be effectively buffered and/or screened from view;
c. Unauthorized entry to cultivation sites must be discouraged through the use of
fences, barriers, or other means;
d. Signage may not be posted either on or off the premises that may identify the site
to the public as a marijuana cultivation location;
e. Cultivation must comply with all other applicable provisions of the Readfield Land
Use Ordinance (e.g. stormwater runoff, erosion control, etc.);
f. Cultivation sites/facilities shall be operated in a manner that ensures that odor is
not detected off-site, i.e. off the premises at locations that are not under the custody
or control of the cultivation facility;
g. For cultivation facilities subject to Site Review, unless otherwise determined by
the Planning Board, an odor control plan must be submitted for review and
approval as part of the Site Review application. The plan shall, at a minimum:
Identify the locations of all potentially odor-emitting activities and
sources, the locations of structural features such as doors,
windows, vents, HVAC systems, etc.;
List specific potentially odor-emitting activities and sources, and
describe the processes that will take place at the facility (e.g.
vegetative flowering, processing, storage);
Describe administrative controls proposed to control odors (e.g.
standard operating procedures, employee training, regular
equipment maintenance, inspections, etc.);
Describe engineering controls proposed to control odors (e.g.
building design features, specific equipment and technology; and
Provide evidence and documentation that the proposed odor
control plan is appropriate and adequate to effectively control
odors and that it is consistent with marijuana industry best
practices for odor control.
Any design or installation of specific odor control technologies
must be conducted by individuals whose training, experience
and/or professional certification is appropriate to satisfactorily
accomplish the work.
Notes:
All stockpiling, spreading or disposal of manure in all districts shall be accomplished
in conformance with the Manure Utilization Guidelines published by the Maine
Department of Agriculture on November 1, 2001, or as amended; and,
A person who owns or operates a farm that meets the criteria in the Nutrient
Management Law, Title 7 MRSA, Section 4204, sub-section 2, shall have and
implement an approved nutrient management plan as required in Section 4204.
Deceased livestock shall be disposed of only in compliance with Chapter 211 of the
Maine Dept. of Agriculture Rules for the Disposal of Animal Carcasses, or the rules
as amended.
SECTION 24. SEASONAL CONVERSIONS OF RESIDENTIAL DWELLINGS
A. Purpose
Readfield's abundant shorelands have evolved over many years into a fragmentation of hundreds of
land lots, most of them historically developed as seasonal, limited-use "camp" lots. Most of these
lots are non-conforming in in terms of size, setbacks, and are under-vegetated and accessed by
Article 8 Performance, Requirements and Standards
115
substandard unpaved roads. Many lots remain served by inadequate or obsolete wastewater
disposal systems.
In recent years there has been an increasing trend toward the conversion of these seasonal
dwellings into year-round dwellings. The impact from these changes of use can contribute to
declines in water quality, property values, and the recreational benefits of these areas to the public.
To help protect these public natural resources, these expansions of use on Readfield's most fragile
lands should receive a level of review similar to the review for new land uses on the shorelands.
B. Definition
A Seasonal Conversion is any development to a seasonal dwelling which has the effect of
rendering that structure habitable for year-round occupancy.
The development activity may include in whole or in part, but is not limited to, installing
insulation, installing or upgrading a heating source, constructing and/or connecting to a water
supply well, replacing or expanding a wastewater disposal system, not to include holding tanks, or
expanding electrical service.
It is the development activity rather than the actual year-round use or occupancy of the dwelling
which determines a seasonal conversion.
C. Non-Conformance/Effective date
Seasonal dwellings which were legally converted to year-round use prior to June 9, 2011 shall be
allowed to remain as legally existing seasonal conversions provided they were in compliance with
the Maine Subsurface Wastewater Disposal Rules at the time of conversion.
D. Permits Required
Seasonal conversion is a change of use requiring permit(s) under Article 4, section 1.H as follows:
1. A seasonal conversion plumbing permit is required from the Local Plumbing Inspector -
Code Enforcement Officer demonstrating the property is in compliance with the Maine
Subsurface Wastewater Disposal Rules, and
2. For dwellings in the Shoreland Residential District which are non-conforming due to
setbacks from any waterbody, and for all buildings within a Stream Protection and
Resource Protection Districts, Site Review approval for change of use is required from the
Planning Board (see Article 6, Section 3), or
3. For dwellings elsewhere in the Shoreland Residential District, a change of use permit from
the Code Enforcement Officer is required. The Code Enforcement Officer shall issue a
permit if the property: a) meets and maintains a minimum of 20% non-vegetated lot
coverage; and b) The applicant submits a stormwater and erosion control implementation
and maintenance plan which meets the requirements of Article 8, sections 10 and 11. The
applicant may prepare the stormwater and erosion control plan; however, the Code
Enforcement Officer may hire a third party consultant, at the applicant's expense, to
confirm the effectiveness of the applicant's plan and/or to seek other appropriate
recommendations. The Code Enforcement Officer shall condition any approval to ensure
the plan is timely implemented and all prescribed stormwater and erosion control measures
are properly maintained.
4. Seasonal conversion permits shall "run with the land." The permittee may transfer any or
all interest in a seasonal conversion permit with any transfer of right, title or interest to the
property. The purchaser or lessee may assume all permissions granted by a seasonal
Article 8 Performance, Requirements and Standards
116
conversion permit and shall be responsible for complying with all standards and special
conditions of approval.
SECTION 25. SMALL WIND ENERGY SYSTEMS
A. Purpose and Intent
The purpose of this section is to regulate the placement and construction of Small Wind
Energy Systems in order to promote their safe and efficient use. These regulations are
meant to encourage the Town's government, residences, small businesses, home
occupations, and farms to use Small Wind Energy Systems, which reduce on-site demand
for utility-supplied electricity and increase consumer energy independence and the demand
for a non-polluting source of energy. The regulations are also intended to minimize the
visual, environmental and operational impacts of Small Wind Energy Systems on the Town
and its residents.
B.
Definitions
1. Meteorological Tower - A structure designed to support the gathering of wind
resource data. This includes the tower, equipment booms, base plate, anchors, guy
wires, and weather instrumentation.
2. Small Wind Energy System - A wind energy conversion system consisting of a wind
turbine, air foils of various shape or size, a tower (or appropriate attachment to, or
inclusion within a building) and all of its related components and associated control or
conversion electronics, which has a rated capacity that does not exceed 100 kilowatts.
A single Small Wind Energy System is intended to produce electrical power primarily
for the benefit of a residence, home occupation, farm, small business, or institutional
use as listed in Table1 of the Land Use Ordinance, or other similar uses. Such a
system may, however, serve more than a single location or use.
3. Small Wind Energy System Setback - The horizontal distance measured from the
center of a tower base to a second specified point.
4. Small Wind Energy System Height - The vertical distance measured from a point on
the ground at the mean finished grade adjoining the foundation as calculated by
averaging the highest and lowest finished grade around the Small Wind Energy System
tower to the highest point of the wind turbine blade when the tip is at its full vertical
position.
5. Tower - A free-standing structure on which a wind measuring, weather
instrumentation, or energy conversion system is mounted.
6. Wind Energy System - A wind powered generator and all associated equipment,
including foundation, base, tower, nacelle, turbine, vane, wire, inverter, batteries, or
other components necessary to fully utilize the wind energy.
C.
Permit Applications
Small Wind Energy System and meteorological tower permit applications shall be
submitted and reviewed in conformance with all applicable provisions of this Ordinance.
In addition to other submissions required by this Ordinance, applications shall include:
1. A description of the wind energy system project, including the manufacturer and
model, the maximum rated capacity of the Small Wind Energy System, tower type, the
Article 8 Performance, Requirements and Standards
117
system height, and whether or not it will be connected to the electric utility lines.
2. If available, standard drawings or blue prints of the wind turbine tower and footings
and an analysis of the tower and footings certified by a licensed professional engineer
shall be submitted. This analysis may be supplied by the manufacturer. Wet stamps
shall not be required.
3. A small wind energy site plan drawn to scale and showing compass orientation, the
planned location of the tower, property lines and physical dimensions of the property,
location and dimensions of existing structures on the property, the proposed location of
the tower, the location of major structures on abutting properties within two (2) times
the system height from the proposed tower location.
4. Written evidence that the electrical utility service provider that serves the proposed site
has been informed of the applicant's intent to install an interconnected customer-
owned electrical generator, unless the applicant does not plan, and so states, to connect
the system to the electric utility lines.
5. A written statement signed by the applicant that certifies that the proposed facility is
designed to meet the applicable standards of this section, including but not limited to
those related to noise control, and acknowledges the applicant's obligation to take
remedial action, if required, in accordance with this section.
6. For applications for roof-mounted wind generators, a structural assessment that
includes evidence that the proposed roof-mounted wind generator system meets the
provisions of this Ordinance; will be installed and operated in a manner consistent with
the manufacturer's standards; and, will be installed only on a roof that is sufficiently
sturdy to hold a roof-mounted wind generator in winds up to100 miles an hour for at
least one hour, as certified by a qualified structural engineer.
D.
Standards
1. Land Use Districts and Non-Conformity. Small Wind Energy Systems and
meteorological towers are permitted as a principal or accessory use in Land Use
Districts as detailed in Table 1 (Land Use Table) in Article 7 of this Ordinance. A
different existing use or an existing structure on the same lot shall not preclude the
installation of a Small Wind Energy System or meteorological tower. A small wind
energy system or meteorological tower installed in accordance with the provisions of
this Ordinance shall not be deemed to constitute the expansion of a nonconforming use
or structure.
2. Setbacks. Small Wind Energy Systems shall be set back a minimum horizontal
distance of 150% of the system height from property lines.
3. Power Production Scale. Small Wind Energy Systems shall be principally used to
produce power for the benefit of a residence, home occupation, farm, small business,
institution, or other similar uses. This standard does not preclude utility line
connections for net metering or other small energy system grid tie-in plans that the
Maine Public Utilities Commission may adopt. The maximum power output for each
small wind energy system shall not be more than 100 kilowatts.
4. Height. The system height of a Small Wind Energy System shall not exceed 100 feet.
The allowed height shall be reduced if necessary to comply with Federal Aviation
Administration Requirements.
5. Ground Clearance. The blade tip of any rotor shall, at its lowest point, have a ground
clearance of not less than twenty-five (25) feet.
6. Noise.
Article 8 Performance, Requirements and Standards
118
a. Except during short-term events including utility outages and severe wind
storms, the audible noise at property boundaries that describe the outer limits
of the system's site in combination with any parcel(s) owned by the system's
site owner that are contiguous with the system site, shall not exceed:
i.
45 dBA between 7:00 a.m. and 7:00 p.m.; and,
ii.
35 dBA between 7:00 p.m. and 7:00 a.m.
b. The Code Enforcement Officer or his/her designee may perform measurements
of sound levels resulting from routine operation of an installed Small Wind
Energy System at the Officer's own initiative or in response to a noise-related
complaint, to determine compliance with the relevant standards of this section.
Such measurements shall be performed as follows:
i.
Measurements shall be obtained during representative weather
conditions when the sound of the small wind energy system is
most clearly noticeable; and,
ii.
Sound levels shall be measured in accordance with nationally
recognized standards.
c. The permittee shall operate the Small Wind Energy System in conformance
with the sound level limits of this section. If, based on post-installation
measurements taken in accordance with this section, the Code Enforcement
Officer determines that the applicable sound level limits are not being met, the
permittee shall, at the permittee's expense, in accordance with the provisions
of this Ordinance and in consultation with Code Enforcement Officer, take
remedial action deemed necessary by the Code Enforcement Officer to ensure
compliance with those limits. Remedial actions that the Code Enforcement
Officer may require, include, but shall not be limited to, one or more of the
following:
i.
Modification or limitation of operations during certain hours or
wind conditions;
ii.
Maintenance, repair, modification or replacement of equipment;
iii.
Relocation of the system; and,
iv.
Removal of the system provided that the Code Enforcement
Officer may require removal of the system only if the Code
Enforcement Officer determines that there is no practicable
alternative.
7. General Siting, Design and Operating Standard
a. At the time of application, each Small Wind Energy System shall be set back
from the nearest abutting inhabited structure by a distance not less than 150%
of the system height. This distance may be reduced with the written consent of
the owner of the abutting property.
b. Anchor points for guy wires for a tower shall be located within the site and are
not otherwise constrained by setback requirements. The point of attachment for
guy wires shall be enclosed by a fence or sheathed in bright orange or yellow
covering to eight (8) feet above the ground.
c. The system's tower, turbine, and blades shall be a non-reflective neutral color
unless otherwise required by the Federal Aviation Administration.
d. Exterior lighting on any tower or turbine associated with the small wind
energy system shall not be allowed except that which is required by the
Federal Aviation Administration.
e. Any Small Wind Energy Systems larger than 1 kW shall be equipped with
automatic over-speed controls to limit the turbine speed to within design limits
and brakes to lock or minimize rotation.
Article 8 Performance, Requirements and Standards
119
f. A Small Wind Energy System that is not in use shall be braked or locked so as
to prevent uncontrolled rotation.
g. All Small Wind Energy Systems shall be maintained in safe condition.
Systems that are structurally unsafe must be repaired or dismantled promptly.
h. The Small Wind Energy System shall be operated and located such that no
disruptive electromagnetic interference with signal transmission or reception is
caused beyond the site. If it has been demonstrated that the system is causing
disruptive interference beyond the site, the system operator shall promptly
eliminate the disruptive interference or cease operation of the system.
i.
Small Wind Energy Systems shall be designed and sited to avoid unreasonable
adverse shadow flicker effects.
j.
Small Wind Energy Systems shall be equipped with an overspeed control
system that: includes both an aerodynamic control such as stall regulation,
variable blade pitch, or other similar system, and a mechanical brake that
operates in fail safe mode; or has been designed by the manufacturer or a
licensed civil engineer and found by the Code Enforcement Officer to meet the
needs of public safety.
k. Any stand-alone tower (not including pole-mounted wind generators) shall be
constructed to provide one of the following means of access control or another
appropriate method of access control as approved by the Planning Board:
tower climbing apparatus located no closer than twelve (12) feet from the
ground; a locked anti-climb device installed on the tower; or, a locked,
protective fence at least six (6) feet in height that encloses the tower.
E.
Discontinuance
A Small Wind Energy System that is not generating electricity for eighteen (18)
consecutive months shall be deemed a discontinued use and shall be removed from the
property by the permittee, and at the permittee's expense, within 120 days of receipt of
notice from the Code Enforcement Officer, unless the permittee provides information that
the Code Enforcement Officer deems sufficient to demonstrate that the project has not been
discontinued and should not be removed. If the system is not removed within this time
period, the municipality may remove the system at the permittee's expense. The permittee
shall pay all site reclamation costs deemed necessary and reasonable to return the site to its
pre-construction condition, including the removal of roads and reestablishment of
vegetation. Upon discontinuance of a Small Wind Energy System, the permit issued under
the terms of this Ordinance lapses.
F.
Waiver or Modification Provision
The Planning Board, in its sole discretion, may modify or waive any of the standards or
requirements of this section if it determines that due to the type, size, design, construction,
site circumstances, and/or location of the proposed system, that the granting of such
modification or waiver:
1. would not cause adverse visual, environmental or operational impacts;
2. would not adversely affect residents or properties in the vicinity;
3. would not adversely affect the general health, safety, and welfare of the Town's
residents; and,
4. would be consistent with the intent and purpose of this Ordinance and the provisions of
this section.
All waiver or modification requests must be based upon a written request of the applicant
submitted at the time of application. Waivers or modifications granted by the Planning
Board shall be in writing.
Article 9: Commercial, Industrial and Infrastructure District Adoption Procedures
120
ARTICLE 9
COMMERCIAL, INDUSTRIAL and INFRASTRUCTURE DISTRICT
ADOPTION PROCEDURE
SECTION 1. PURPOSE
The purpose of the Commercial, Industrial and Infrastructure District designation process shall be
to allow the opportunity for large-scale commercial, industrial and infrastructure activities to locate
and expand within the Town in keeping with the character of the community.
The procedures contained in this section require that any land proposed to be placed in a
Commercial, Industrial and Infrastructure District and its subsequent proposed use be reviewed by
the Planning Board and then presented to the Town Meeting for approval. After the District is
created, each land use, structure and building proposed for the district is required to obtain Site
Review approval from the Planning Board.
SECTION 2.
STANDARDS
All proposals for a Commercial, Industrial and Infrastructure District shall meet the following
standards:
A.
The proposed zoning change shall be consistent with the Town of Readfield Comprehensive
Plan and shall be in keeping with the Town's rural character.
B.
The proposed use shall be compatible with the surrounding area with respect to rural
character, existing uses and anticipated development.
C.
The proposal shall serve the public good, safety or welfare of the Town of Readfield.
D.
The proposal shall be protective of all natural resources including significant wildlife
habitat.
SECTION 3. GENERAL REQUIREMENTS
The applicant shall comply with the following requirements and restrictions:
A.
Only conditions and restrictions that relate to the physical development or operation of the
property shall be included in the proposal.
B.
A Commercial, Industrial and Infrastructure District proposal shall not include any
provision or condition that limits or restricts the Town of Readfield zoning authority.
C.
Areas currently within a Village Residential District shall not be eligible for a Commercial,
Industrial and infrastructure District designation.
D.
Land uses within a Commercial, Industrial and Infrastructure District shall be limited to
those allowed in the Table of Uses in Article 7 for the district as designated at the time of
application for a Commercial, Industrial and Infrastructure designation.
E.
The terms, conditions and restrictions of the zoning agreement shall run with the land and
bind all future owners of the land or any other person who claims an interest in the property.
F.
All development and use of the proposed re-zoned property shall comply with all applicable
standards and requirements in this Ordinance.
Article 9: Commercial, Industrial and Infrastructure District Adoption Procedures
121
G.
Any conditions or requirements placed upon the proposed rezoning may be more restrictive
but shall not be less restrictive than the applicable requirements of this Ordinance.
H.
An agreement containing all conditions and restrictions of a Commercial, Industrial and
Infrastructure District proposal shall be recorded in the Kennebec County Registry of Deeds
within 10 days of the date that it is approved at the Town Meeting. The rezoning shall not
become effective until the agreement is recorded.
I.
Any violation of the terms, conditions and the restrictions contained in the zoning
agreement shall be violations of this Ordinance and subject to applicable enforcement
standards. A statement to this effect shall be included in the zoning agreement.
J.
The proposed site has an existing or proposed access to a town, state-aid highway or state
road.
K.
The proposal contains provisions for a buffer area along all property lines sufficient to
screen adjacent land uses. A landscape buffer area shall be provided along the road frontage
that allows for safe access to the site and also sufficiently screens any development from
public view.
L.
The site plan shall show the future locations of all proposed structures or provide a written
set of design standards for the placement of future structures. Structures shall be located on
the site in a manner so as to protect the environment, minimize off-site impacts such as
noise, light, and odors, provide the maximum visual screening from adjacent roads and
property, and be in keeping with the Town's character.
M.
The proposal shall include a list of those uses planned to be developed in the Commercial
Industrial and Infrastructure District.
SECTION 4.
APPLICATION REQUIREMENTS
A.
The applicant for a Commercial, Industrial and Infrastructure District proposal shall submit
an application to the Code Enforcement Officer.
B.
The application shall include the following:
1.
A survey plan of the site showing all applicable details required in Article 6, Section
3.J.1.c.
2.
A narrative describing the proposal and how it specifically meets all the standards and
requirements contained in this Article.
3.
A copy of the conditions and restrictions proposed for the property.
4.
A timetable indicating the start and completion dates of the development or
construction in the proposed rezoned area.
C.
Application Procedure:
1.
The applicant shall submit the rezoning application and fee to the Code Enforcement
Officer. The Code Enforcement Officer shall issue a dated receipt to the applicant upon
acceptance of the application. The Code Enforcement Officer shall review the
application for completeness and within 10 days notify the applicant in writing whether
or not the application is complete and what, if any, additional submissions are required
for a complete application.
2.
The Code Enforcement Officer shall submit the complete application to the Planning
Board for a public hearing.
Article 9: Commercial, Industrial and Infrastructure District Adoption Procedures
122
3.
The Planning Board shall hold a public hearing within 30 days of receipt of a complete
rezoning application.
4.
The Town shall publish notice of the hearing stating the purpose of the hearing and
giving the date, time and place of the public hearing in a newspaper of general
circulation in the area. The notice shall be published 2 times, not more than 14 days
before and not less than 7 days before the public hearing.
5.
The Town shall notify by first class mail the owners of all property within 500 feet of
the property to be rezoned at least 20 days in advance of the public hearing. The notice
shall include the date, time and place of the public hearing, and a description of the
proposed rezoning proposal. The owners of property shall be considered those against
whom taxes are assessed. Failure of any property owner to receive a notice of public
hearing shall not necessitate another hearing or invalidate any action of the Planning
Board. A list of all property owners that were mailed the public hearing notice shall be
maintained and include the date the notice was mailed.
6
The Planning Board may continue the public hearing in order to conduct a site visit.
7.
The Planning Board shall use the standards contained in Section 2 to make its
recommendation upon the proposal. The Board may set conditions upon the
application in order to further the purposes set forth in this section.
8.
After reviewing the application, the Planning Board may vote to recommend the
application, recommend the application with conditions or not to recommend the
application.
9.
The Planning Board's final recommendation upon the proposed re-zoning application
shall be submitted to the Select Board which shall schedule the application for a vote
of the Town to take place within ninety (90) days of the Select Board's receipt of the
Planning Board's recommendation. If the annual Town Meeting is scheduled to take
place within that ninety-day period, the Town vote on the application may occur as part
of the annual Town Meeting. Otherwise, a Special Town Meeting shall be scheduled to
conduct a vote on the application, except that the Special Town Meeting need not be
held within sixty (60) days of the Annual Town Meeting.
10. The Town Meeting shall consider the rezoning article and may vote to approve the
application as submitted or deny the application.
11. The Select Board members shall sign the rezoning agreement and the Town Clerk shall
attest that the proposal was approved at the Town Meeting. A copy shall be provided to
the applicant, Planning Board and the Code Enforcement Officer.
12. The Planning Board shall amend the Land Use Map to show the location of the
approved Commercial Industrial and Infrastructure District.
13. In the event that the Town votes to approve a rezoning application under this Article,
the proposed commercial, industrial or infrastructure project (except for projects
subject to the Town of Readfield Solar Ordinance) shall then be submitted for full site
review pursuant to Article 6, Section 3 of this Ordinance. If the proposed project is
subject to the Town of Readfield Solar Ordinance, the applicant will then need to
demonstrate compliance with the terms of that Solar Ordinance.
Article 10: Board Standards
123
ARTICLE 10
ROAD STANDARDS
SECTION 1. PURPOSE
A.
To establish minimum specifications for the lay-out and construction of Town roads;
B.
To establish minimum specifications for the lay-out and construction of private roads;
C.
To establish a procedure for acceptance of an existing private road to become a Town road;
D. To institute a procedure for the joint review by the Road Committee and the Planning Board
for the lay-out and construction of all new or expanding roads.
SECTION 2. APPLICABILITY
This article applies to all roads as defined in Article 11, and road right-of-ways, proposed to be
laid out and constructed, expanded, or extended within the Town of Readfield including those
roads to be constructed for acceptance by the Town of Readfield in accordance with Title 23,
M.R.S.A. Section 3025.
SECTION 3. LIMITATIONS
A.
The Town shall accept roads only by a vote of the legislative body.
B.
Nothing in this article shall be construed as prior commitment by the Town to accept any
road, irrespective of its condition or of any work performed or money expended in
anticipation of acceptance by the Town.
C.
Any proposed road construction subject to the provisions of this Article, including roads for
acceptance by the Town as a public way, or as a private road as part of a subdivision, on or
after the date of acceptance of this Ordinance shall be designed by a licensed professional
engineer. The design must be consistent with the design standards set forth in this Article
and Appendix "A" and any applicable standards pursuant to Article 6, section 3 (Site
Review) and Article 8, sections 19.F (Roads and Driveways within the Shoreland Districts).
For development proposals requiring Site Plan review by the Planning Board, all road-related
design plans must be reviewed and approved by the Road Committee prior to final project
approval by the Planning Board. All road development must be constructed as approved.
D. The re-construction of public roads shall meet the design standards and construction
specifications of this Article to the greatest practical extent as determined by the Road
Committee, which may include written recommendations from a licensed design engineer,
legal counsel, or other professional representing the Committee.
SECTION 3.A. ACCEPTANCE OF PRIVATE ROADS
Existing private roads of record, including those considered legally abandoned or
discontinued, and constructed prior to the effective date of the Article may be offered for
acceptance by the Town subject to the recommendations of the Road Committee and
acceptance of those recommendations by the Select Board. The Road Committee will base
their recommendations on whether the road has been sited and constructed or upgraded to
meet the requirements of this Article to the greatest practical extent. In determining the
greatest practical extent, the Road Committee must consider the following:
The degree to which the road meets the Road Construction Standards in Appendix
"A";
Article 10: Board Standards
124
The stormwater drainage characteristics of the road and their direct impact on any
private or public property or resources, including waterbodies; and
The existing condition of the road, and expected future maintenance to the proposed
right-of-way beyond the traveled way;
Prior to making a recommendation for acceptance by the Town, the Select Board following
shall hold a public hearing and will consider, in addition to the Road Committee's
recommendations:
The amount of use or anticipated future use of the road;
The degree to which the property owners benefited by the road support the
proposed acceptance;
The taxable valuation of properties benefited by the road to off-set future
maintenance costs of the road;
Any legal advice the Town's attorney may provide regarding legal ownership of the
road, liabilities, or other issues as the Road Commissioner may request.
SECTION 4. ADMINISTRATION
A.
Applicants shall file a plan with any request to construct, expand or offer for acceptance by
the town any road showing the following:
1. The name(s) of the developers or grantors of the road;
2.
The scale of the plan;
3.
The magnetic north bearing;
4.
The starting and ending points of the road with relation to monuments;
5.
The right-of-way (R-O-W) lines in relation to monuments;
6.
A legal description describing by metes and bounds the dimensions, both linear and
angular, necessary for locating boundaries, lots, easements, and other descriptive
features;
7.
All lots abutting the R-O-W having an ownership interest in the existing or proposed
R-O-W and their current owners of record, including mailing address, source of deed,
and the Assessor's map and lot number of each parcel;
8.
All natural water ways and water courses within the R-O-W of the said road and the
least distance between the R-O-W and any other waterbody;
9.
Location and specifications for all culverts and drainage-ways;
10. Construction specifications to include all applicable design and construction methods
and materials, with cross-sectional drawings for new construction or as-built profile for
an existing road;
11. Evidence that all land required for the right-of-way of specified width can be deeded to
the Town free of any legal encumbrance;
12. Any application fee that may be required; and,
13. The licensed professional engineer's seal who prepared the plan.
B.
Upon notice to the Select Board, the owner(s) or applicant to construct and/or dedicate a
road, may petition for acceptance of said road after completion of the following:
1. Site Plan Review and approval by the Planning Board of any proposed subdivision
road;
2.
Establishment of minimum standards by the Road Committee for a new road or a
determination by the Road Committee that an existing road meets these minimum
standards to the greatest practical extent;
3.
Inspection by the Road Commissioner;
4.
Records of the inspections;
Article 10: Board Standards
125
5.
Preparation of the notice and layout by the Select Board filed with the Town Clerk;
6. Notice of public hearing (copy filed with Town Clerk);
7.
The public hearing record filed with the Town Clerk;
8.
Article in Town Warrant to accept road as a Town way;
9.
Notice of decision filed with the Town Clerk and a copy to owner or applicant.
C. If an applicant to the Planning Board proposes to construct a new private road as part of a
subdivision or other development project, and if the applicant proposes said road never be
eligible for acceptance as a Town Road, the applicant shall so stipulate in said application
and on the plan to be recorded at Registry of Deeds, thereupon the road may be constructed
to Private Road Standards.
SECTION 5. CONSTRUCTION SPECIFICATIONS
A.
General Specifications: The following specifications shall apply to all new roads
construction:
1.
The excavated areas between ditches shall be cleared of all debris including large rocks,
trees, stumps, roots, bushes, and other organic material.
2.
All developed areas of the road section shall be located within the road right-of-way
and in no case shall the edge of the shoulder be less than 8 feet from either edge of the
right-of-way.
3.
All construction activity involving soil disturbances shall conform with Maine
Department of Transportation Best Management Practices for Erosion & Sediment
Control (February 2008).
4. An applicant must demonstrate that provisions for stormwater from the road(s) comply
with Maine Department of Environmental Protection standards adopted pursuant to the
Maine Stormwater Management Law or Site Location of Development Law.
5. Culverts within a road right-of-way shall be constructed of High-Density
Polyethylene or recognized equivalents accepted by the Maine Department of
Transportation (MDOT). Roadway culverts shall not be less than 18 inches in
diameter for road crossing and 12 inches in diameter for driveways, recreational trails,
skid trails, or other uses requiring entrance from the roadway. Culverts, and stormwater
basins and ponds shall be designed with principal spillways to control flows from a 24-
hour storm of a 25-year frequency and may be required to be designed by a licensed
professional engineer registered in the State of Maine.
6. Any proposed bridge construction shall be designed by a licensed professional engineer
with regard to suitability and safety for the intended application. The licensed
professional engineer's written recommendations or comments shall be submitted with
the design.
7.
The design standard for turnarounds shall be of the "T" Turnaround type as depicted in
Appendix A-1.
8. No trees, shrubs, fill, fences, or other structures shall be installed or placed within a
public right-of-way without prior written approval from the Road Commissioner.
B.
Specifications for Roads: Any traveled way which meets the building density as defined in
the definition of a road shall meet the dimensional requirements for roads as specified in
Article 10: Board Standards
126
the Road Constructions Standards table of details in Appendix A. All gravel and bituminous
material shall meet current M.D.O.T. specifications.
SECTION 6. EASEMENTS
Whenever it is required to create or alter an existing water course in constructing a road, a
drainage easement shall be secured from the property owner(s) affected. Wherever the toe of
slopes for ditches, shoulders, grading, and other purposes required by this Ordinance cannot be
adhered to within the required right-of-way limits, and grading or excavation is necessary beyond
these limits, slope easements shall be secured from abutting property owners. Said drainage and
slope easements shall be secured by the Town or by the applicant without cost to the Town.
SECTION 7. DRIVEWAY / ROAD ENTRANCES
The construction of any new entrance onto a Town or privately-owned road or a Right of Way
requires a permit issued by the Road Commissioner or his/her designee and must comply with the
Town of Readfield Driveway Entrance Siting and Culvert Installation Policy, adopted April 12,
2004.
SECTION 8. UTILITIES
Longitudinal runs of water mains and sanitary lines shall be located and separated as prescribed by
applicable State standards. Public utility poles shall be placed behind the flow line of the road
ditches and as approved on Town roads by the Select Board.
SECTION 9. INSPECTION DURING CONSTRUCTION
Roads approved for construction must conform to the following inspection process:
A.
All roads shall be inspected by the Road Commissioner or a licensed professional engineer
appointed by the Town Select Board at the expense of the applicant at the following
intervals:
1. At the point that the area to be constructed has been grubbed.
2. At the point subgrade has been reached, and prior to the delivery of subbase gravel. This
inspection may be waived by the road inspector if grubbed surface and subgrade are the
same.
3. At the completion of grading the sub-base or base gravel.
4. Upon completion of graded or paved surface.
B.
Scheduling of inspections shall be the responsibility of the developer or builder and require a
24-hour notification.
C.
Reports of inspection required in sub-section A shall be provided within 7 days of the
completed inspection to all concerned parties.
Article 11 Definitions
127
ARTICLE 11
DEFINITIONS
SECTION 1. CONSTRUCTION OF LANGUAGE
In the interpretation and enforcement of this Ordinance, all words, other than those specifically
defined in this Ordinance, shall have their ordinarily accepted meaning. In the case of any
difference of meaning or implication between the text of this Ordinance and any map, illustration,
or table, the text shall control.
The word "person" includes a firm, association, organization, partnership, trust, company, or
corporation, as well as an individual or any other legal entity.
The present tense includes the future tense, the singular number includes the plural, and the plural
numbers include the singular.
The word "shall" and "will" are mandatory; the word "may" is permissive.
The word "lot" includes the words "plot" and "parcel".
The word "structure" includes the word "building".
The word "used" or "occupied", as applied to any land or building, shall be construed to include the
words "intended, arranged, or designed to be used or occupied".
The word "Town" means the Town of Readfield.
SECTION 2. DEFINITIONS
In this Ordinance the following terms shall have the following meanings:
Abutter: The owner of any parcel with one or more common boundaries or points, as well as
property owners of any parcel located directly across any road, railroad or stream along the road,
railroad or stream from the parcel involved in application or appeal. Property owners shall mean
all parties listed by the Town Tax Assessor as those against whom taxes are assessed and includes
any Qualified Conservation Holder of an easement in any of the parcels described herein.
Accessory Dwelling Unit: A self-contained dwelling united located within, attached to or detached
from a single-family dwelling unit located on the same parcel of land. For purposes of this
definition self- contained shall mean that each unit contains living, cooking, and bathroom
facilities.
Accessory Use or Structure: A use or structure which is customarily both incidental and
subordinate to the principal use or structure on the same lot only. The term "incidental" in
reference to the principal use or structure shall mean both a) subordinate and minor in significance
to the principal use or structure, and b) attendant to the principal use or structure. For example, a
mobile home dwelling unit is not customarily subordinate and minor in significance to the principle
structure even when used only for storage. Such accessory uses, when aggregated, shall not
subordinate the alleged principal use of the lot.
Affected Land: "Affected land" means reclaimed and un-reclaimed land, land that has or shall
have the overburden removed, land on which stumps, spoil or other solid waste has or shall be
Article 11 Definitions
128
deposited and storage areas or other land, except natural buffer strips, that shall be or has been used
in connection with the excavation.
Affordable Housing Development: A residential housing development in which:
For rental housing: A household whose income does not exceed 80% of the
area median income for the community, as defined by the U.S. Department of
Housing and Urban Development, and can afford 51% or more of the units in
the development without spending more than 30% of the household's income
on housing expenses, including rent and utilities.
For owned housing: A household whose income does not exceed 120% of the
area median income for the community, as defined by the U.S. Department of
Housing and Urban Development, and can afford 51% or more of the units in
the development without spending more than 30% of the household's income
on housing costs, including mortgage payments and insurance, and certain other
taxes and fees.
Agriculture: The traditional cultivation of fields, crops, and orchards, the raising of livestock,
including cattle, horses, swine, sheep, and poultry to provide income including farm stands and
greenhouses when the products of the greenhouses are sold commercially. Agriculture is essentially
synonymous with farming. Agriculture does not include forest management and timber harvesting
or livestock confinement feeding operations.
Agriculture, Intensive: "Excluding seasonal farm stands that operate less than one-hundred and
eighty (180) days in a twelve (12) month period, retail, wholesale or commercial agricultural
uses/activities on a site which meets the following criteria:
1. The site contains at least 3000 square feet of floor area, in the aggregate, of non-residential
structures that are directly associated with the agricultural activities/use(s) such as;
greenhouses, barns or other structures; and/or
2. There are, generally, a combined total of 20 or more vehicle entrances and exits per
business day.
Agriculture Light Industry: a low impact commercial activity which results in a product or
service primarily derived from the crops or livestock located or raised on the property. The
business is conducted in whole or in part on the same premises where the owner of the business
resides. Agricultural light industry is small in scale, is carried on primarily in a dwelling unit or
structure accessory to a dwelling unit by a member of the family residing there, is in keeping with
the character of the district, and the activity is, and remains, clearly incidental and secondary to the
primary use of the premises as a residence. Examples of Agricultural Light Industry include, but
are not limited to: wreath making, and maple syrup and honey production, which may be sold
directly from the home or through mail order. Agricultural light industry does not include
commercial activities such as meat processing and slaughter operations.
Aggrieved Party: A person whose land is directly or indirectly affected by the grant or denial of a
permit or variance under this Ordinance, a person whose land abuts land for which a permit or
variance has been granted, or a group of five or more citizens of the municipality who represent an
interest adverse to the grant or denial of such permit or variance.
Alteration: Any change, or modification in construction, or change in the structural members of a
building or structure, such as bearing walls, columns, beams or girders, or in the use of a building.
The alteration shall also include change, modification, or addition of a deck, dormer, staircase, or
roof of the building.
Article 11 Definitions
129
Amusement Facility: Any private, commercial premises which are maintained or operated
primarily for the amusement, patronage, or recreation of the public, containing four (4) or more
table sports, pinball machines, video games, or similar mechanical or electronic games, whether
activated by coins, tokens, or discs, or whether activated through remote control by the
management.
Applicant: The person(s) applying for approval under this Ordinance.
Authorized Agent: An individual or a firm having written authorization to act on behalf of a
property owner.
Automotive Body Shop: A business establishment engaged in body, frame, or fender
straightening and repair, or painting and undercoating.
Automobile Graveyard: See Article 8, Section 25 on Junkyards, Automobile Graveyards and
Automobile Recycling.
Automobile Repair Shop: A business establishment engaged in general repair, engine rebuilding,
and/or parts replacement of motor vehicles.
Basal Area: The area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive
of bark.
Basement: Any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level.
Bed and Breakfast: Any dwelling in which transient lodging or boarding and lodging are
provided and offered to the public for compensation for less than one month. This dwelling must
also be the full-time, permanent residence of its owner or operator. There shall be no provisions
for cooking in any individual guest room.
Bedroom: Any room within a dwelling unit, or any room within an accessory structure to a
dwelling unit that may serve primarily as sleeping quarters; a bedroom must have a closet and a
means of exterior egress.
Boarding House: See "Rooming/Boarding House
Buffers/Screening: Buffers/screening are fences, vegetation, landscaping, berms and mounds used
to minimize any adverse impacts or nuisance conditions as experienced on the site or from adjacent
areas.
Building: see Structure.
Bureau: State of Maine Department of Conservation's Bureau of Forestry.
Business and Professional Offices: The place of business of doctors, lawyers, accountants,
financial advisors, architects, surveyors, real estate and insurance businesses, psychiatrists,
counselors, and the like, or in which a business conducts its administrative, financial or clerical
operations including banks and other financial services, but not retail sales or activities utilizing
trucks as part of the business operation.
Bunkhouse: A detached bedroom having no plumbing; accessory to a single family dwelling for
the temporary accommodations of guests of the property owner while the owner is an occupant of
Article 11 Definitions
130
the principal dwelling. Such structures shall be constructed only under a permit for limited use
occupancy and shall not be converted to a dwelling unit, as defined, until all applicable standards
for a dwelling unit are met.
Campground: Reference Article 8, Section 24, L. Definitions.
Canopy: The more or less continuous cover formed by tree crowns in a wooded area.
Certificate of Mailing: A form of mailing which provides evidence of mailing per U.S. Postal
Services Domestic Mail Manual, Section 914.
Church: A building or structure, or group of buildings or structures, designed, primarily intended
and used for the conduct of religious services, excluding school.
Civic, Convention Center: A building or complex of buildings that house Town offices and
services and which may include cultural, recreational, athletic, convention and entertainment
facilities owned and/or operated by a governmental agency.
Cluster Development: A development consisting exclusively of residential dwelling units or
commercial uses, planned, developed as a whole, or in a programmed series of developments, and
controlled by one developer which contemplates an innovative, more compact grouping of
dwelling units or other uses. Cluster developments treat the developed area as an entirety to
promote flexibility in design, architectural diversity, the efficient use of land, a reduction in the size
of road and utility systems, the creation of permanent, common open space, and the conservation of
natural characteristics of the land.
Cluster Subdivision: A subdivision in which the lot sizes are reduced below those normally
required in the zoning district in which the development is located in return for the provision of
permanent open space. Such open space or the development rights of that open space shall be
owned in common by lot/unit owners, the Town, or a land conservation organization. Clustering
shall not be used to increase the overall net residential density of the development.
Code Enforcement Officer: A person appointed by the Town Manager to administer and enforce
this Ordinance. Reference to a Code Enforcement Officer may be construed to include Building
Inspector, Electrical Inspector, Plumbing Inspector and the like when applicable.
Commercial Establishment: Establishments that render goods and/or services primarily on a
retail basis which are customarily carried on in a building specifically for that purpose, such as
retail stores, service stations, restaurants, etc. Lawn and garage sales, conducted for more than 14
calendar days in any year, shall be subject to site review requirements of Article 6, Section 3, and
Planning Board approval.
Commercial Recreation: Any commercial enterprise which receives a fee in return for the
provision of some recreational activity including, but not limited to: campgrounds, racquet and
tennis clubs, health facilities, amusement parks, golf courses, gymnasiums and swimming pools,
etc., but not including: bowling alleys or amusement centers, as defined herein.
Common Shoreland Access: The use of any shorefront property to provide a point of access for
the occupants of three or more dwelling units, whether accomplished through ownership, lease,
easement, or any other arrangement.
Communication Tower: A structure on which commercial transmitting and/or receiving devices
are located.
Article 11 Definitions
131
Community Center, Club: A building that houses any voluntary association of persons organized
for social, religious, benevolent, literary, scientific, or political purposes; whose facilities,
especially a clubhouse, are open to members and guests only, and not the general public; and are
not engaged in activities customarily carried on by a business or for pecuniary gain.
Conforming: A building, structure, use of land, or portion thereof, which complies with the
provisions of this Ordinance.
Commercial Scale Wind Energy Systems: A wind energy conversion system which:
has a rated capacity greater than 100 Kilowatts; and/or
produces electrical power primarily for sale; and/or
is intended to produce electrical power primarily for the benefit of its locations and / or land
uses other than residences, home occupations, farms, small businesses, institutions, as
listed in table 1 of the Land Use Ordinances, or other similar uses.
Community Living Arrangement: A residential community living arrangement consisting of a
housing facility for persons with disabilities that is approved, authorized, certified or licensed by
the State. Disability has the same meaning as the term "handicap" in the federal Fair Housing Act,
42 United States Code, Section 3602.
Construct: To build, place, move upon, pave, grade, or make other physical improvements to land.
Excavation, placing fill, and the like shall be included in this definition.
Contiguous Lots: Lots which adjoin at any line or point, or are separated at any point by a body of
water less than fifteen feet wide.
Cross-sectional area: The cross-sectional area of a stream or tributary stream channel is
determined by multiplying the stream or tributary stream channel width by the average stream or
tributary stream channel depth. The stream or tributary stream channel width is the straight line
distance from the normal high-water line on one side of the channel to the normal high-water line
on the opposite side of the channel. The average stream or tributary stream channel depth is the
average of the vertical distances from a straight line between the normal high-water lines of the
stream or tributary stream channel to the bottom of the channel.
Day Care Facility: A building or use of property operated for the care or instruction of three or
more persons who are not children of the principal child-care provider or blood relatives of the
principal adult caregiver.
DBH: The diameter of a standing tree measured 4.5 feet from ground level.
Dead-end: A road which connects with a Town way at only one intersection.
Demolition: To tear down or raze a structure or portion of any structure, and the appropriate
removal and disposal of all the debris resulting from the demolition according to local, state and
federal laws and regulations.
Density: The number of dwelling units per lot of land or unit.
Development: Any man-made changes to improved or unimproved real estate including, but not
limited to: the construction of, additions or improvements to buildings or other structures, mining,
dredging, filling, grading, paving, excavating, or drilling operations, sewage disposal systems or
water supply facilities.
Article 11 Definitions
132
Developed Area: Any land area on which development exists.
Dimensional Requirements: Numerical standards relating to spatial relationships including but
not limited to setback, lot area, shore frontage and height.
Disability: Any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
Disruption of shoreline integrity: The alteration of the physical shape, properties, or condition of
a shoreline at any location by timber harvesting and related activities. A shoreline where shoreline
integrity has been disrupted is recognized by compacted, scarified and/or rutted soil, an abnormal
channel or shoreline cross-section, and in the case of flowing waters, a profile and character altered
from natural conditions.
District: A specified portion of the Town, delineated on the Official Land Use Map, within which
certain regulations and requirements, or various combinations thereof, apply under the provisions
of this Ordinance.
Docks, Marinas, Bridges and other Structures and Uses Extending Over or Beyond the
Normal High-Water Line of a Waterbody or within a Wetland:
Temporary: Structures which remain in or over the water for less than seven months in any
period of twelve consecutive months.
Permanent: Structures which remain in or over the water for seven months or more in any
period of twelve consecutive months.
Driveway: a private vehicular way providing access to no more than one lot for one single family
dwelling or other single ownership structures.
Dwelling Unit: Any building or structure or portion thereof designed, used, or intended for
occupancy as separate living quarters, permanent or temporary in nature, used or proposed to be
used as separate living quarters seasonally or throughout the year. Separate living quarters are
those in which the occupants live separately from any other individuals in the building and which
have a direct access from the outside of the building or through a common hall. A building or
structure providing temporary accommodations such as a bunkhouse, as defined, shall not
constitute a dwelling, but shall be counted as a bedroom as defined in the Maine State Plumbing
Codes. The term shall include mobile homes and Tiny Homes as defined in Maine law at 29-A
M.R.S. § 101(80-C), but shall not include travel trailers or other recreational vehicles.
1. Single-Family Dwelling: Any structure containing one (1) dwelling unit for occupation by
not more than one (1) family. Units may be attached.
2. Two-Family Dwelling: A building containing only two (2) dwelling units, for occupation
by not more than two (2) families.
3. Multi-Family Dwelling: A building containing three (3) or more dwelling units, such
buildings being designed exclusively for residential use and occupancy by three (3) or more
families living independently of one another with the number of families not exceeding the
number of dwelling units.
Article 11 Definitions
133
Essential Services: The construction, alteration, and maintenance of gas, electricity,
communication facilities (excluding communication towers), small cell facilities, steam, fuel, or
water transmission, distribution, collection supply or disposal systems. Such systems may include
towers, poles, wires, pipelines, call boxes, and similar accessories, whether above- or below-
ground, but shall not include buildings which are necessary for the furnishing of such services.
Essential Services includes primary transmission and pipeline corridors, and wind turbines for off-
site energy supply and distribution.
Excavation: Any removal of earth material from its original position.
Expansion of a Structure: An increase in the floor area or volume of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of Use: The addition of one or more months to a use's operating season; or the use of
more floor area or ground area devoted to a particular use.
Floor Area: The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, as measured from the exterior faces of these exterior walls, plus the horizontal area of any
unenclosed portions of a structure such as porches and decks, but excluding steps or stairways up to
four feet in width. Floor area shall include all habitable or potentially habitable areas of a dwelling,
including but not limited to: 1) basements if overhead clearance is 6'0" or more, and 2) half stories
measured within points having 4' or more of overhead clearance.
Forest Management Activities: Timber cruising and other forest resources evaluation,
management and planning activities, insect and disease control, timber stand improvement,
pruning, timber and other forest harvesting, regeneration of forest stands, and other similar
associated activities, and the construction of skid trails and roads used primarily for timber
harvesting--but not the construction or creation of roads for other developments purposes.
Forested wetland: A freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Forest Stand: A contiguous group of trees sufficiently uniform in age class distribution,
composition, and structure, and growing on a site of sufficiently uniform quality, to be a
distinguishable unit.
Foundation: The supporting substructure of a building or other structure including basements,
slabs, frost walls, or other base consisting of concrete, block, brick, stone or similar material..
Frontage, Road or Shore: The horizontal, straight-line distance between the intersections of the
side lot lines with (1) the road right-of-way or (2) the shoreline at normal high-water elevation.
Gasoline Service Station: Any place of business at which gasoline, other motor fuels or motor oil
is sold to the public for use in a motor vehicle, regardless of any other business on the premises.
General Town Way: A way constructed to a minimum standard that may be laid out by the
municipal officers, and offered in a warrant for acceptance by the legislative body.
Grade: In relation to buildings, the average of the finished ground level at the center of each wall
of a building.
Great Pond: Any inland body of water which in a natural state has a surface area in excess of ten
(10) acres, and any inland body of water artificially formed or increased which has a surface area in
Article 11 Definitions
134
excess of thirty (30) acres except where such body of water is man-made and in addition is
completely surrounded by land held by a single owner.
Ground cover: Small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Group Home: A dwelling which provides common living area and supervision to three or more
persons not related to the owner or operator of the dwelling and which does not constitute a
Community Living Arrangement, as defined.
Harvest Area: The area where timber harvesting and related activities, including the cutting of
trees, skidding, yarding, and associated road construction take place. The area affected by a
harvest encompasses the area within the outer boundaries of these activities, excepting unharvested
areas greater than 10 acres within the area affected by a harvest.
Hazardous Material: Any gaseous, liquid or solid materials, either in pure form or incorporated
into other materials, according to current guidelines of the U.S. Environmental Protection Agency,
or substances designated as hazardous by the United States Environmental Protection Agency
and/or the Maine Department of Environmental Protection.
Height of a Structure: The vertical distance between the mean elevation of the finished grade at
the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances which have no floor area.
Home Occupation: See Article 8, Section 7.A, or any amendment thereto.
Hotel/Motel: A commercial building or group of buildings built to accommodate, for a fee,
travelers and other transient guests who are staying for a limited duration with sleeping rooms
without cooking facilities, each rental unit having its own private bathroom and its own separate
entrance leading either to the outdoors or to a common corridor or hallway. A hotel may include
restaurant facilities where food is prepared and meals served to its guests and other customers.
Increase in nonconformity of a structure: The expansion of any structure, or portion thereof,
which causes further deviation from the dimensional standard(s) creating the non-conformity such
as, but not limited to, reduction in waterbody, wetland, road, or property boundary setback
distances, increase in lot coverage, or increase in height of a structure.
Individual Private Campsite: An area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10) individuals and
which involves site improvements which may include but not be limited to a gravel pad, parking
area, fire place, or tent platform.
Industrial: The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Industry Heavy: Industrial activity that uses or processes relatively large volumes of raw
materials, usually involving large and heavy products, equipment, and /or facilities, and often
involves complex manufacturing processes. Heavy industry is typically capital intensive and sells
its products to other industrial customers rather than end consumers. Examples of heavy industry
include, but are not limited to those involving the production of: chemicals, plastics, steel, oil,
machinery and automobiles.
Industry Light: Industrial activity that uses a moderate amount of raw or partially processed
Article 11 Definitions
135
materials, and requires a relatively small amount of area and power, to produce or assemble small
end-user or consumer goods. Light industry is typically more labor than capital intensive.
Examples of light industry include, but are not limited to the manufacture or assembly of: clothing,
consumer electronics and furniture.
Institutional Use: A building or use devoted to some public, governmental, educational,
charitable, medical, or similar purpose.
Junkyard: See Article 8, Section 25 on Junkyards, Automobile Graveyards and Automobile
Recycling.
Kennel: A commercial establishment, in which more than four (4) dogs or four (4) cats are sold,
housed, bred, boarded, or trained for a fee.
Land Management Road: A route or track consisting of a bed of exposed mineral soil, gravel, or
other surfacing materials constructed for, or created by, the passage of motorized vehicles and used
primarily for timber harvesting and related activities, including associated log yards, but not
including skid trails or skid roads.
Licensed Forester: A forester licensed under 32 M.R.S.A. Chapter 76.
Livestock: Farm animals kept for use or profit such as, but not limited to, horses, cattle, goats,
sheep or swine.
Lot: An area of land in one ownership, or one leasehold, with ascertainable boundaries established
by deed or instrument of record, or a segment of land ownership defined by lot boundary lines on a
land subdivision plan duly approved by the Planning Board and recorded in the County Registry of
Deeds.
Lot Area: The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two lots.
Lot, Minimum Area: The minimum required lot area within a district for a single use.
Lot, Corner: A lot with at least two contiguous sides abutting a street or right-of-way.
Lot, Coverage: The percentage of a lot covered by all non-vegetated surfaces, including but not
limited to the total footprint area of all structures, paved or unpaved driveways and parking areas,
and other non-vegetated surfaces including land previously developed.
Lot of Record: A parcel of land, a legal description of which, or the dimensions of which, are
recorded on a document or map on file with the County Register of Deeds.
Lot, Shorefront: Any lot abutting a body of water.
Lot, Through: Any interior lot having frontages on two more or less parallel streets or rights-of-
way or between a street and a body of water, or a right-of-way and a body of water, or between two
bodies of water, as distinguished from a corner lot. All sides of through lots adjacent to streets,
rights-of-way, and bodies of water shall be considered frontage.
Lot Width: The distance between the side boundaries of the lot measured at the front setback line.
Article 11 Definitions
136
Marijuana Cultivation: The planting, propagation, growing, harvesting, drying, curing, grading,
trimming or other processing of marijuana for use or sale. "Cultivation" or cultivate" does not
include marijuana manufacturing, testing or extraction.
Market Value: The estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels as determined by the Town Assessor or a
qualified real estate appraiser.
Medium Borrow Pit: A borrow pit that has a total reclaimed and un-reclaimed area from 5 to 30
acres.
Mining and Mineral Extraction: Any area of excavation which removes soil, topsoil, loam, sand,
gravel, clay, rock, peat, or other like material from its natural location for the purpose of
transporting the product or material being removed away from the extraction site. Mining and
mineral extraction does not includes the preparation, washing, cleaning or other treatment of that
product so as to make it suitable for commercial, industrial or construction use; nor does mining
and mineral extraction include excavation or grading as a part of any approved construction or
development project.
Mobile Home: A structure transportable in one or more sections which, when erected on a site,
measures eight (8) body feet or more in width and thirty-two (32) body feet or more in length, and
which is built on a permanent chassis and designed to be used as a dwelling, with or without a
permanent foundation, when connected to the required utilities, and includes the plumbing, heating,
and electrical systems contained therein. Park model recreational vehicles are not mobile homes.
Mobile Home Park: A parcel or adjoining parcel of land, under single ownership, that has been
planned and improved for the placement of three or more mobile homes (M.R.S.A. Title 10,
Section 9081).
Mobile Home Park Lot: The area of land on which an individual home is situated within a mobile
home park and which is reserved for use by the occupants of that home. A municipality may
require a lot to be designated on a mobile home park plan.
Modular or Manufactured Home: Manufactured housing units which the manufacturer certifies
are in compliance with Title 10, chapter 957, and rules adopted under that chapter, meaning
structures, transportable in one or more sections, which are not constructed on a permanent chassis
and are designed to be used as dwellings on foundations when connected to required utilities,
including the plumbing, heating, or electrical systems contained in the unit. These units shall
measure no less than 18 feet in width for the entire body length when assembled at the site.
Native: Indigenous to the local forests.
Natural Buffer Strip: "Natural buffer strip" means an undisturbed area or belt of land that is
covered with trees or other vegetation.
Naturally Internally Drained: Areas of a site that, as a result of the predevelopment topography
and interim topography produced during development of the site, are and will remain at all times
over the course of the development graded so that neither eroded materials nor runoff either crosses
the property boundary or enters a protected natural resource, natural buffer strip or other protected
area. Areas that rely on man-made structures, including but not limited to berms, dikes, basins or
undersized culverts, in order to maintain internal drainage shall not be considered naturally
internally drained.
Article 11 Definitions
137
Natural Resource-Based Industries: Natural resource-based industries shall be construed to
include the following: Extraction and processing of water, wood and lumber, minerals and soils,
and the associated retail functions for those natural resource-based industries. Examples of the
same would include wells and bottling plants, sawmills and lumberyards and mining and soils
processing industries.
Natural Resource-Based Recreation: Outdoor commercial recreational facilities which have a
primary characteristic of requiring a sizable amount of land including, but not limited to, ballfields,
golf courses, driving ranges, and the associated retail functions for those natural resource-based
recreational uses. Such retail functions must be incidental to the recreational use and may include
the sale or rental of goods and services related to the recreation, as well as refreshment stands.
Net Residential Density: The number of dwelling units per net residential acre.
Non-Conforming: A building, structure, lot, use of land, or portion thereof, legally existing at the
effective date of adoption or amendment of this Ordinance which thereafter fails to conform to all
applicable provisions of this Ordinance, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect. Any change of
use, increase in the size, or any further deviation from the dimensional standards creating the non-
conformity shall constitute an increase in non-conformity. (See definition for "Increase in non-
conformity of a structure.")
Non-Town Way: A way constructed at a standard less than the general town way standards and
shall not be laid out by the municipal officers.
Normal High Water Line: That line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water or changes in vegetation, and which
distinguishes between predominantly aquatic and predominately terrestrial land. Areas contiguous
with rivers and great ponds that support non-forested wetland vegetation and hydric soils and that
are at the same or lower elevation as the water level of the river or great pond during the period of
normal high-water are considered part of the river or great pond.
Normal Repair and Maintenance of a Structure: Construction work intended to prevent the
ordinary and predictable deterioration of an existing structure or to maintain it in its established
functional state. This may also include capital repairs intended to extend the normal economic life
or to increase the functionality of the structure but only insofar as repairs do not include any new
construction, increase in the footprint of the structure; new, enlarged or replacement of a
foundation; relocation, structural alteration or substantial demolition to a structure; or result in
Reconstruction (as defined Article 11) or the change of Use (as defined Article 11) of the structure.
Nuisance: A nuisance includes, but is not limited to the use of any property defined as a nuisance
in Title 17 MRSA, section 2802 or for any other type of conduct or in any manner as to cause or
permit a condition to exist which results in injury or damage or interferes with the reasonable
private use and enjoyment of the property of another, different from that sustained by the general
public. A nuisance may be either such a use as is unreasonable because of its very nature or a use
which, though reasonable in and of itself, becomes unreasonable because of the negligent manner
in which it is exercised with respect to the legal rights of others.
Nursing Home: A privately operated establishment where maintenance and personal or nursing
care are provided for persons who are unable to care for themselves.
Official Submittal Date: The date upon which the Board issues a receipt indicating a complete
application has been submitted.
Article 11 Definitions
138
Open Space Uses: Non-intensive uses of land not requiring structures, such as hunting, fishing,
hiking, motorized vehicular traffic, forest management activities, fire prevention activities, wildlife
management practices, soil and water conservation practices, mineral exploration, surveying and
resources analysis and harvesting of wild crops.
Outside Corner Lot: A lot situated on the exterior angle created by a loop in a road or by the
intersection of two roads.
Parks and Recreation: Non-commercially operated recreation facilities open to the general public
including, but not limited to, playgrounds, parks, monuments, green strips, open space, mini-parks,
athletic fields, boat launching ramps, piers and docks, picnic grounds, swimming pools, and
wildlife and nature preserves, along with any necessary accessory facilities, rest rooms, bath
houses, and the maintenance of such land and facilities. The term must not include campgrounds,
or commercial recreation and amusement centers.
Passenger Car Equivalents at Peak Hour: The number of passenger cars, or in the case of non-
passenger vehicles, the number of passenger cars that would be displaced by non-passenger
vehicles, that pass through an intersection or on a roadway under prevailing roadway and traffic
conditions at that hour of the day during which the traffic volume generated by the development is
higher than the volume during any other hour of the day. For purposes of this article, one tractor-
trailer combination is the equivalent of two (2) passenger cars.
Permitted Use: Uses which are listed as permitted uses in the various districts set forth in this
Ordinance. The term shall not include prohibited uses.
Permanent Marker: Stone monument, concrete monument, drill hole in ledge or iron pin not less
than 1/2 inch in diameter and 24 inches long.
Preliminary Subdivision Plan: The preliminary drawings indicating the proposed layout of the
subdivision to be submitted to the Planning Board for its consideration.
Premises: One or more lots which are in the same ownership and are contiguous or separated only
by a road or waterbody, including all buildings, structures, and improvements.
Primary Sand and Gravel Recharge Area: The surface directly overlying sand and gravel
formations that provides direct replenishment of groundwater in sand and gravel and fractured
bedrock aquifers. The term does not include areas overlying formations that have been identified as
unsaturated and are not contiguous with saturated formations.
Principal Structure or Building: The structure in which the primary use of the lot is conducted.
Principal Use: The primary use to which the premises are devoted and the main purpose for which
the premises exist.
Public and Private Schools: Primary and secondary schools or parochial schools which satisfy
either of the following requirements: the school is not operated for a profit or as a gainful business,
or the school teaches courses of study which are sufficient to qualify attendance in compliance with
State Compulsory Education Requirements.
Public Drinking Water Source: Any groundwater well or surface water source that directly or
indirectly serves a water distribution system that has at least 15 service connections or regularly
services an average of at least 25 individuals daily at least 60 days of the year.
Article 11 Definitions
139
Public Facility: Any facility, including buildings, property, recreation areas, schools, cemeteries,
museums, libraries, which are owned, leased, or otherwise operated or funded by a government
body or a public or quasi-public entity. A public facility also includes a church, hospital,
congregate housing, fraternal organization or any similar building or property devoted to an
institutional use whether publicly- or privately-owned and operated. A public facility does not
include roads or other linear transportation facilities.
Public Utility: Any person, firm, corporation, Town department, board or commission authorized
to furnish gas, steam, electricity, waste disposal, communication facilities, transportation or water
to the public.
Qualified Conservation Holder: pursuant to 33 MRSA Section 476 et seq., a qualified
conservation holder is any of the following which hold a legal interest in real property for which
the purpose is to conserve and permanently protect natural resources and open space, including
wildlife habitat, significant scenic areas, ecologically sensitive areas, productive agricultural and
forest lands, or public recreation areas:
i. The State of Maine acting through its Department of Conservation or Department of
Inland Fisheries and Wildlife;
ii. The United States acting through its U.S. Forest Service of the Department of
Agriculture or the U.S. Fish and Wildlife Service or Park Service of the Department
of Interior;
iii. The Town; or
A nonprofit, tax-exempt nature conservation organization qualifying under Section 501(C)(3) of
the Internal Revenue Code.
Rear Lot: A lot which has no frontage or insufficient frontage on a public or privately owned road
in the land use district in which it is located. A rear lot does not include legally-existing non-
conforming lots of record with some, but insufficient frontage on a public or privately owned road.
Rear Lot, Access: The permanent easement for a right-of-way, or the fee simple ownership of
frontage not conforming to the requirements of the district in which it is located, and which is at
least 30 feet in width, described by metes and bounds, or by a plan, and recorded in the Kennebec
County Registry of Deeds, and held by deed or other legal instrument by the owner of the rear lot,
as required for the development of rear lots under Article 8, Section 5.
Reclamation: The rehabilitation of the area of land affected by mining, including but not limited
to, the stabilization of slopes and creation of safety benches, the planting of forests, the seeding of
grasses and legumes for grazing purposes, the planting of crops for harvest and the enhancement of
wildlife and aquatic habitat and aquatic resources.
Reconstruction: The replacement, repair to, restoration or improvement of a structure, the cost of
which equals or exceeds 50 percent of the fair market value of the structure before the start of
construction of the improvement.
Recreational Vehicle: A vehicle or an attachment to a vehicle designed to be towed, and designed
for temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, or motor home. In order to be considered as a vehicle and not as a
structure, the unit must remain with its tires on the ground, must be registered with the State
Division of Motor Vehicles, and must be currently inspected where required to be inspected in the
state in which it is registered.
Recycling Operation: A privately owned facility for the recycling of heavy goods and bulk metal.
Article 11 Definitions
140
Redemption: The redemption of goods such as bottles and cans as a recycling activity.
Residual Basal Area: The average of the basal area of trees remaining on a harvested site.
Residual Stand: A stand of trees remaining in the forest following timber harvesting and related
activities.
Re-subdivision: The division of an existing subdivision or any change in the plan for an approved
subdivision which affects the lot line, including land transactions by the applicant not indicated on
the approved plan.
Retail Business: A business establishment engaged in the sale, rental, or lease of goods or services
to the ultimate consumer for direct use or consumption and not for resale.
Right-of-way: A strip of land acquired by deed, reservation, dedication, forced dedication,
prescription or condemnation and intended to be occupied by a road, railroad, electric transmission
lines, oil or gas pipeline, water line, sanitary or storm sewer and other similar uses.
Road: Any route for vehicle access other than a driveway.
Road Committee: Individuals appointed by the Select Board for advising the Road Commissioner.
Rooming/Boarding House: A residential use consisting of at least one dwelling unit together with
one or more rooms that are rented or intended to be rented to more than one occupant (s), but
which rooms, individually or collectively do not constitute separate dwelling units. A rooming or
boarding house is designed to be occupied by longer-term residents as opposed to overnight guests.
Seasonal Conversion: Any development to seasonal dwelling which has the effect of rendering
that structure habitable for year-round occupancy (see Article 8, section 27).
Screening: See Buffers/Screening
Service Business: A form of business providing different types of labor services in a wide variety
of business sectors, including but not limited to: professional (e.g. law, accounting, medical,
banking, insurance, brokerage, etc.), lawn and landscaping services, contracting and building
services, fabrication, repair, and cleaning services, pet grooming and hair salons, funeral homes,
catering, delivery, rental, and telecommunications.
Setback: The minimum horizontal distance from a road, lot line or normal high-water line of a
water body, tributary stream or upland edge of a wetland to the nearest part of any structure.
Shared Driveway: A driveway jointly owned by the owners of the properties it gives access to,
either owned in common or with reciprocal right-of-way easements legally described on a deed. A
shared driveway comprises the entire width of its easements as extending from the public way to
which it is attached, to the point at which it serves only one lot. All lots which contain a portion of
the shared driveway or its easement shall be deemed to be served by the shared driveway whether
or not the lots have alternate access to another road. The shared driveway does not create frontage
for any lots. (See Article 8, section 18.E for additional standards).
Shoreland District: All land area located within the Shoreland Residential, Resource Protection,
and Stream Protection Districts as described in Article 7, Section 4.
Shoreline: The normal high-water line, or upland edge of a wetland.
Article 11 Definitions
141
Sign: See Article 8, Section 14H (Definitions), or as amended.
Significant Sand and Gravel Aquifer: A deposit of ice-contact and glacial outwash sediment that
stores and transmits significant quantities of recoverable water. Significant sand and gravel aquifers
are identified on a map entitled "Hydrogeologic Data for Significant Sand and Gravel Aquifers",
Map 17, as compiled by the Maine Geological Survey.
Skid Road or Skid Trail: A route repeatedly used by forwarding machinery or animal to haul or
drag forest products from the stump to the yard or landing, the construction of which requires
minimal excavation.
Slash: The residue, e.g., treetops and branches, left on the ground after a timber harvest.
Stream: A free-flowing body of water from the point where it is depicted as a perennial stream on
the most recent edition of a United States Geological Survey 7.5 minute series topographic map, to
the point where the body of water becomes a river or flows to another water body or wetland.
Structure: This term shall be defined by 38 MRSA section 436A, to mean anything built for the
support, shelter or enclosure of persons, animals, goods or property of any kind.
The term "structure" includes anything that is:
temporarily or permanently constructed or erected on, in or above the ground or
waterbody, or is attached to something having a fixed location on the ground, including,
but not limited to, buildings, patios, carports, storage sheds, outdoor wood boilers, and
other building features; docks, swimming pools, ponds in excess of 10,000 square feet,
exterior satellite dishes, exterior antennas and other exterior utility services, including, but
not limited to, fuel tanks, generators, heat pumps, solar panels or other heating/cooling or
electrical services; and, semi-trailers and truck-boxes or other similar containers in a fixed
location for more than thirty (30) consecutive days.
The term "structure" does not include:
sidewalks, steps or stairways of no more than four feet in width, driveways, parking lots,
utility hook ups, utility poles and metering services, subsurface wastewater disposal system
components;, storm water treatment field or garden walls or embankment retaining walls, or
fences, except as subject to waterbody setback requirements and for purposes of this
definition, legally established signs are not considered a structure.
Subdivision: Subdivision means subdivision (1) as defined in Title 30-A M.R.S.A., 4401, as
amended, i.e., generally a division of a tract or parcel of land into three (3) or more lots within a
five year period (see statute for full definition).
Subdivision, Major: Any subdivision containing more than three lots or dwelling units that are
wholly within the boundaries of the Town of Readfield or that extends across the Town of
Readfield's boundary into a neighboring municipality; or any campground with fifty or more sites;
or any subdivision having one or more lots to be used for three or more principal buildings or uses
on the same lot.
Subdivision, Minor: Any subdivision containing not more than three lots or dwelling units that are
wholly within the boundaries of the Town of Readfield or that extends across the Town of
Readfield's boundary into a neighboring municipality, or not otherwise qualifying for classification
as a major subdivision.
Article 11 Definitions
142
Substantial Construction Start: Improvements to a site or building for which development
approval has been granted, in accordance with this Ordinance, which constitutes the completion of
at least 30% of the proposed improvements.
Subsurface Sewage Disposal System: Any system designed to dispose of waste or waste water on
or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grand-fathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not include any discharge system licensed
under 38 M.R.S.A. section 414, any surface waste water disposal system, or any municipal or
quasi-municipal sewer or waste water treatment system.
Sustained Slope: A change in elevation where the referenced percent grade is substantially
maintained, or exceeded throughout the measured area.
Swimming Pool: An outdoor man-made receptacle or excavation designed to hold water to a
depth of at least thirty-six (36) inches, primarily for swimming or bathing, whether in the ground or
above the ground.
Timber harvesting: The cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the shoreland zone on a lot that has
less than two (2) acres within the shoreland zone shall not be considered timber harvesting. Such
cutting or removal of trees shall be regulated pursuant to this Ordinance.
Topsoil: The top layer of soil that is predominantly fertile and ordinarily moved in tillage or the
equivalent of such a layer in uncultivated soils.
Tract or Parcel of Land: All contiguous land in the same ownership, whether or not the tract is
separated at any point by: an intermittent or non-navigable stream or a private road established by
the abutting landowners.
Tributary Stream: A channel between defined banks created by the action of surface water,
whether intermittent or perennial, and which is characterized by the lack of upland vegetation or
presence of aquatic vegetation and by the presence of a bed devoid of topsoil containing
waterborne deposits on exposed soil, parent material or bedrock, and which flows to a water body
or wetland as defined. This definition does not include the term "stream" as defined elsewhere in
this Ordinance.
Upland edge of a wetland: The boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters (approximately
twenty (20) foot) tall or taller.
Use: The manner, in which land or a structure is arranged, designed or intended, or is occupied.
Variance: A relaxation of the terms of this Ordinance where such variance is not contrary to the
public interest and where owing to conditions peculiar to the property, and not the result of actions
of the applicant, a literal enforcement of this Ordinance would result in unnecessary or undue
hardship. A financial hardship shall not constitute grounds for granting a variance.
Vegetation: All live trees, shrubs, ground cover, and other plants including without limitation,
trees both over and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Article 11 Definitions
143
Vernal Pools: Vernal pools are temporary to semi-permanent pools occurring in shallow
depressions that usually contain water for only part of the year, filling during the fall and winter as
the water table rises and typically drying out by mid to late summer. Significant Vernal Pool
habitat is further defined and protected by law under the Natural Resource Protection Act, 38
MRSA, section 480.
Waterbody: Any great pond or stream.
Water crossing: Any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Water-Dependent Uses: Those uses that require, for their primary purposes and functions,
location on submerged lands or that require direct access to, or location in, inland waters and that
cannot be located away from these waters. The uses include, but are not limited to commercial and
recreational boating facilities, excluding recreational boat storage buildings, waterfront docks, boat
building facilities, navigational aids, marinas, retaining walls, and uses that primarily provide
general public access to inland waters.
Wetland: Freshwater swamps, marshes, bogs, and similar areas, excluding forested wetlands,
which are:
1. of 2 or more contiguous acres, or of less than 2 contiguous acres and adjacent to a surface
water body, excluding any river, stream, or brook such that in a natural state, the combined
surface area is in excess of 2 acres; and,
2. inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Wetlands, Forested: A freshwater wetland dominated by woody vegetation that is 6 meters or
taller.
Wholesale Business: A business establishment engaged in the sale of goods or commodities in
large quantities for individual consumption or resale.
Wind firm: The ability of a forest stand to withstand strong winds and resist wind throw, wind
rocking, and major breakage.
Woody Vegetation: Live trees or woody, non-herbaceous shrubs.
Working Pit: The extraction area, including side slopes of an excavation for mineral extraction as
defined. It does not include a stockpile area or an area that has a permanent fixed structure such as
an office building, permanent processing facility or fixed fuel storage structure.
Appendix A: Road Construction Standards
144
Appendix A
Road Construction Standards
1. Geo-textile fabric is required for Private Roads (except by waiver) and may be required for
General Town Roads at the discretion of the Road Commissioner or the Town's design engineer.
2. Bituminous pavement is not required but when used, must comply with the above construction
standards.
3. Culverts must be constructed of High-Density Polyethylene meeting at least AASHTO M294,
Type S standards.
4. Actual culvert size to be determined by the Road Commissioner or design engineer based on
watershed drainage characteristics.
5. No shoulder is required when concrete, stone, or asphalt curbing is used.
6. 49.5 feet for a layout of old county or town roads.
Commercial/Industrial
Institutional
General Town Road
Private Road
Right-of-way width
66 feet
60 feet
50 feet6
Travel way width
22 feet
20 feet
14 feet
Shoulder width5
4 feet
2 feet
2 feet
Gravel base depth1
20 inches
16 inches
16 inches
Surface gravel depth
4 inches
4 inches
4 inches
Bituminous pavement2
(Inches of binder/surface)
3/1
2/1
2/1
Roadway crown
(paved)
(unpaved)
¼ inch per foot
¼ inch per foot
¾ inch per foot
¼ inch per foot
¾ inch per foot
Maximum grade
10%
12%
12%
Minimum grade
0.5 %
0.5%
0.5%
Minimum angle of street
intersection
80 degrees
60 degrees
60 degrees
Minimum radius
300 feet
250 feet
150 feet
Minimum tangent
100 feet
25 feet
0
Minimum back slope
2/1
2/1
2/1
Minimum fill slope
4/1
3/1
2/1
Radius at intersection
40 feet
25 feet
20 feet
Sight distance
As per Driveway Entrance
Siting Policy
As per Driveway Entrance
Siting Policy
As per Driveway Entrance
Siting Policy
Sidewalk width
4 feet (if required)
N/A
N/A
Culverts3, 4
18 inches minimum
15 inches minimum
15 inches minimum
Shoulder grade
1-1 ½ inches per foot
1-1 ½ inches per foot
1-1 ½ inches per foot
Ditch elevation
36 inches
30 inches
24 inches
Parking on roadside
If required
N/A
N/A
Appendix A-1: Road Construction Standards/Turnarounds
145
Appendix A-1
Road Construction Standards
Appendix B - Other Town Ordinances Relating to Land Use
146
Appendix B
Other Town Ordinances Relating to Land Use
The following additional documents are adopted by reference as an
integral part of this Land Use Ordinance and are found on file with the
Town Clerk.
A.
Noise Standard Ordinance; adopted June 11, 1998.
B.
An Ordinance Regulating Storage and Land Application of Sludge and Other
Residuals; adopted September 21, 1998 and amended February 22, 1999, June
14, 2001, December 9, 2002 and September 15, 2004.
C.
Telecommunications Towers Ordinance, adopted June 11, 1998 and amended
February 22, 1999 and May 15, 2008.
D.
Floodplain Management Ordinance adopted February 10, 1997 and amended
June 11, 2009.
E. Town of Readfield Solar Ordinance adopted June 8, 2021
Appendix C: Riparian Rights Lines
147
Appendix D - Readfield Standard Conditions of Approval
148
Appendix D
Readfield Standard Conditions of Approval
Unless otherwise specifically stated in the permit or deemed inapplicable, the following Standard
Conditions of Approval shall apply to all Site Review and subdivision approvals granted by the
Readfield Planning Board (PB) and to all permits issued by the Code Enforcement Officer
(CEO) and Local Plumbing Inspector (LPI) for land use activities as indicated in ARTICLE 7,
Land Use Table. Strict conformance with these conditions, any other specific conditions of
approval specified by the Readfield Planning Board or CEO/LPI, and the performance standards
in Article 8 of the Readfield Land Use Ordinance (LUO) is necessary for the project to meet the
legal criteria of approval.
1. This approval is limited to and includes those proposals and plans subject to site plan or
subdivision review contained in the application and supporting documents submitted by
the permittee as approved by the PB or CEO/LPI. All deviations from the plans and
proposals contained on these documents must be reviewed and approved prior to
implementation of the project.
2. All structures shall be constructed in compliance with all setbacks from water bodies,
wetlands, roads and property lines, and from any other features and within any building
envelope specified in the approval of the PB and the LUO.
3. Permittees shall secure and comply with all applicable Federal, State, and local licenses,
permits, covenants or deed restrictions approved by the, authorizations, conditions,
agreements and orders prior to and during construction and operation.
4. Permittees shall submit all reports and information or other documents requested by the
Planning Board or CEO within thirty (30) days of the date of decision for this project, or
as otherwise required by this permit, demonstrating that all conditions of this approval
have been complied with.
5. All land use activities shall be conducted in such a manner as to minimize stormwater
discharges, soil erosion and sedimentation to surface waters, wetlands, and adjacent
properties. All land use activities, including road and driveway construction shall
conform to the performance standards relating to stormwater runoff and erosion control
specified in Article 8, Sections 10 and 11 of the LUO and the Driveway Entrance Policy
of the Town of Readfield.
6. In all Shoreland Districts, clearing of vegetation for approved construction shall conform
to the performance standards specified in Article 8, Section 19.D, of the LUO. Where
natural vegetation is removed and is to be replanted, it must be replanted with vegetation
effective in stabilizing soil and preserving natural beauty.
7. The specific character and healthful condition of the area of the activity covered by this
permit shall be maintained. The area shall be kept free of litter and trash and any other
deposits which could create nuisances, unsightly, unsafe, or unhealthy conditions.
Appendix D- Readfield Standard Conditions of Approval
149
8. Work to be performed by a contractor pursuant to this approval shall not begin before the
contractor has been provided by the permittee with a copy of the Notice of Decision,
permit and a copy of this Standard Conditions of Approval.
9. Filling, excavating, or other soil disturbance conducted as part of any approved activity is
not allowed adjacent to (within 75 feet) or below the mean high water line of any surface
water body or wetland, except as may be approved by the Maine Department of
Environmental Protection.
10. With the exception of subdivision approvals, this land use permit shall expire if the work
authorized by the permit is not substantially started within one year of the date from
which this permit was approved by the Planning Board, CEO or LPI, except that the
CEO, LPI may renew this permit for one additional year provided there is no change in
the proposed project or applicable regulations, and the $25.00 renewal fee has been paid.
This permit shall "run with the land" (i.e. remains in effect if property is transferred to a
new owner or lessee) unless it expires pursuant to Article 4, Section 7 or the approved
use is abandoned or discontinued as defined and further described in Article 4, Section
7A. A purchaser or lessee of the property that is the subject of this approval assumes all
rights and obligations granted by the permit, including all standard and special conditions
of the approval subject to the provisions of Article 4, Section 7A.
11. These permitted activities do not grant any property rights. It does not authorize any
person to trespass, infringe upon or injure the property of others but allows Duly
Authorized Officials of the Town to inspect the property.
12. If the review of any portion of this project was based upon written recommendations
from the Cobbossee Watershed District, then this development shall comply with all of
those recommendations, unless otherwise approved by the Planning Board. All costs and
fees associated with this review, including any environmental compensation fees required
by the District, shall be paid by the applicant prior to any development.
13. If the approval of this land use permit is conditioned upon the recording of any
documents with the Kennebec County Registry of Deeds, this recording must be
completed within ninety (90) days of this approval or prior to commencing the activity,
whichever occurs first, unless the condition for recording states otherwise. Attested
copies or other proof of recording of these recorded documents shall be forwarded to the
Code Enforcement Office within thirty (30) days of the date of recording or prior to the
issuance of any additional permits, whichever occurs first. All costs associated with
recording these documents shall be paid by the permittee.
14. The landowner shall provide reasonable access to the CEO/LPI or others authorized by
the Town to inspect the property to ensure that all Town provisions of the approved
permit(s), including the Standards Conditions of Approval and any additional conditions
of approval are being met, e.g. storm water management measures erosion control
measures, dimensional requirements, assessing, etc. Reasonable access shall mean access
within 72 hours of the request, unless the CEO, LPI, Health Officer determines that good
cause exists for not providing access within 72 hours in which case the CEO, LPI, HO
Appendix D- Readfield Standard Conditions of Approval
150
shall establish another time to inspect. After the second failure of reasonable access to the
property, the landowner shall be deemed in violation of Readfield's Land Use Ordinances
(LUO) and subject the landowner to the penalties prescribed in Title 30-A M.S.R. Section
4452 in addition to any other remedies the LUO at Law or State Regulations.
15. Should the project be found at any time not to be in compliance with any of these
Standard Conditions of Approval, or should the permittee construct or operate this
development in any other way other than specified in the application or supporting
documents, or as modified by the conditions of approval, then the terms of this approval
shall be considered to have been violated and enforcement action shall be taken to
achieve compliance as specified in Article 2, Section 1of the LUO.
16. You are advised that commencing development or use of your property within 45 days of
this notice of decision is at your own risk, even as approved by the Planning Board.
During the 45-day period, any party aggrieved by the Planning Board decision may file
an appeal with the Board of Appeals to overturn, amend, or further condition this
Planning Board, CEO/LPI decision.
Subdivisions are also subject to the following additional conditions:
17. Unless otherwise approved by the Planning Board, all subdivision site improvements,
including the conveyances of any proposed easements, must be completed prior to the
issuance of any lot use or development permits.
18. Land use permits approved for subdivisions shall "run with the land" (i.e. remain in effect
if property is transferred to a new owner or lessee). In the event any or all interest in this
permit transfers with any transfer of right, title, or interest to this land, a new purchaser or
lessee assumes all rights and obligations granted by the permit, including compliance
with all standard and special conditions of the approval, subject to relevant provisions of
Article 4, Section 7A.
19. All recorded subdivision plans shall contain the following statement: "The revisions to
this subdivision plat/plan/deeds shall be approved by the Readfield Planning Board as in
Title 30-A M.R.S. Section 4407."
Any approval, amendment or revision thereto of any subdivision plan or plat shall be recorded
with the Kennebec County Registry of Deeds within ninety (90) days of this approval or prior to
commencing the activity, whichever occurs first, unless the condition for recording states
otherwise. Attested copies or other proof of recording of these recorded documents shall be
forwarded to the Code Enforcement Office within thirty (30) days of the date of recording or
prior to the issuance of any additional permits, whichever occurs first. All costs associated with
recording these documents shall be paid by the permittee.
Appendix E - DEP Pictorial of Greatest Practical Extent Setback Rule