Town of Roxbury
Shoreland Zoning Ordinance
Adopted: March 7, 2011
Amended: June 23, 2022
Town of Roniay Shorelane Puan Ordinance
TABLE OF CONTENTS
Page
LOR Ol [DOSE Soeeremenesmeneemtcennneereneneenantearesrsacsnesterencseterehesttstetsttrtetnttereatee enter street renee earn
Zs tAUENOMEY sesoceessseeseyeereusseeserccavssnnescuncereueveceeaeuaronnep nactnet waar smaeaiven oe VEN STINE SRE ana
3. Applicability 0.00... ccc cseeecseesessenseseceeeseensesesseescsecseesensesessesessessesessesaeseesccsesasaecatesssessteseseateseace
A BATE CUIVE DAG ccccescersenevs rene severe snasurees cousescvac exec enveces se esete sie 1< owas Cane e SV SIC OSCE SSn SUTTER
A. Effective Date of Ordinance and Ordinance Amendment ............cc:cccccssesessesseesessssersesseseeeseese 1D,
ZEEE SY sorcenoncoscocncsoonaca sconcoctcsnosa deans chao rec ESL oR SSCS EE EBLE RCE OUT ECE ER UROL enor TEAT
G, SO Vera ili yas. sececeseverescevevceevecescecenvscavin cuzissvsnesoséccueceiocorsoosenoeroserasnonecancoesenygnncersoserenvonenrancegueones d
7. Conflicts with Other Ordinances .........ccccccesesccesecseesceesecseescssscseesscsecesscstsseesseessesscsseacessecssssccsseesenee L
S, Armendme nts wes xc csseves sxcce sacs saesn vosscuepeavcxtez cous earzsvescovee' nds 000s Soececsoesonsencsrecacceneasconssnnerersssonsacncnneasl
9. Districts and Zoning Map ........cccecceseseesecseeseessecseesecssessecsesecesscsecsuesascseesacsecssscstessesessseaterevsueesseed
A, Official'Shoreland Zoning Map scceccscsussnescacessesovexsesoeeneezsuausvans; ob4)0-a005,hcdecceessrencerserseestesevepearnoensad.
B. Scale Of Map .....cecscessssessescssescsesecseseeneceesssesessesecsesssesecsessuasacsesavscseecseeasscvssseeesatstsacsvscesessseeed,
C. Certification of Official Shoreland Zoning Map ssecs.cce.ss.seseressscorenmreseearnnnnrsnieanastsnaneiee2
D. Changes to the Official Shoreland Zoning Map.........c:ccccesesessesssesecsscsseessescesceseeseesesssescessesseeeseed
E. Location of District Boundaries ............ccccccccccccsecscessesseecceeessceascscesecesesscsecesecsecsscsseaceasssscsecseensed,
10. Interpretation of District Boundaries.............ccccccccccsecssessescceseeacescsseessesecaecscesecssecsscsevssvaceaceacersee
11. -- Land Use Requirements ...0.....:.ccccceesessessssssesseseceseeseesecsseseessesecsassacesessesscssscssscsesseessevscessvssesesssed
V2. ---- Non -conformance isevese,svescsucvecesccvcewcates s3e0ee5asstets ssss400¥ sostntvaoceees o1seseoncencoseoneenosearsarcosgassessnsennnnid
A. PULPOSC oo. ceeeseesescesensessesecseesaccseesseesensesaeeseesecseesessesseesessecssssascsscsecaeceusssessscsessessseesseasesceeteesl
B. General xcccssscssevsseuresucssncsesecawncnsecevssseeceeseceveseossbes cx sseseeues susvasd0see 00a GA. FTN Sab Ea Sob east chorsenSanvoocdd,
C. Non-conforming Structures ........ccceccessecsesseesecseessecsesseestesecsecssssasesscsecsscasesscssvsssseessecsessesseeenal
D.. Non-Conforming USGS... s...0.cs0.desenssavsevess sovsuvexeronss cers eegensaveeaversaverssusrncsrestonerioaraerieiecewuas seve
E. Non-conforming Lots........ccccsssesessessesessesesseeeseesseeeeeeseeeseeessessesseesesessesecsesassecsessesaesacseeeceasseeeed
13. Establishment of Districts .0.....c.ccccccccessesscsccssecsecseeesesscesecscesessecescssessecssesscsuccsceaseasenssesessseseeseesO
A. Resource Protection District ...........cscsecsscessseeseesetseescseecsesscsecsesecsecsesacsscatsataseecateaeersstscsesenereO
B. Limited Residential District 0.0.0... cc eccecesseseeseseesecsecsesecsessesessesscseesssassesaecasescsesscsecesestesseesaesenO
G. Limited Commercial District. ...scsssscesesactessevsessssecsaes esp 1ev00 050040 onvcaccntesosorceeesoveeneaeocacancsncsenecarsoel
D. Stream Protection District.........cccccccssssessesscseesscssecsecsesseesecesecssessessessceeseucsacssecscesscessssecesecsavse
14. Table (Of Land USGS tay essasecevasxvsuvszesexessevecvessnavesvines onevetseet sss sane seis 15s 005 sa UIN6ISTGs Siuks snk We daen ennai
15, Land Use Standards........cccccecsscesecseeseesscssessecsececseeecsecsaeesceseceeessesecssccseseesstessesescatcsseeaseaeeaee
Ac, Minimum: Lot Standards so. seccceces cesses eesusszesvezs canvas cores sassssnss-sunsaesavsstestsies Gois oe Tan REND)
B. Principal and Accessory Structures .......ccccccccesessssssecessssessesesscsscsecsesscsesccsesaccscsacsecstssesseseseesensed)
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the........
Normal High-Water Line of a Water Body or Within a Wetland......... Error! Bookmark not de fined.
Ds, 'Campgrounds: .sevcescsriessseevsessaecerercssmsassaeesesseeseaveruseersamemerern nen wanna manatee elo
E. Individual Private Campsites ..........ccccssssssescescsecseesreseteceseesseesesecaeesssessessenesessssasescstsatseesseeeeee 13
Ey CommercialiandilndustrialWsesyse-vecceresevee ae teconresrencotrer see tomersticesreei css sttemrearentenaee el
G. Parking Areas... cece eeeeseeeecssceeeenecseeseeseeeseesecscesssescssecsessecesesesascsseasessessesasesseesessssseserere LA
H. Roads and Driveways..........ccsscescssessesseseseeseeseseeseesesecsecscseeesecsscseassccsesecsessseasssestesessesseseseeseeee 1D
J. Storm: Water Runotf...........cnssecssseccusssescassosvsasvvarssrsi satessiatevesenssastacterrestsarcquanstesrsasesesssnonvenl
K.; Septic: Waste Disposal s.c.x.ccascosexcocc cscesesuseovsescvecsasezaceusassuavatess e000; Med tmeet sen. Seseactdnetcdncsnccerneneet lO
L. Essential Services... eeccsccessecesecsseeeseceseecseesseeesecssessseesecsecesseeseecssecstessscceseesescsssessscssscsseees LO
M. Mivetal Explorationiand Extraction sis. cccssxessacnnes wesosemnneainimnnanaim anwesnlS
N. Agriculture... ccc ecceecseeecsecseeeecseccecescesecaessteeseaeseceeseessaseaecsessesssesseseaessesssesssescessesessesseese LD
QO, "Timber Harvestina: = Repealed srecescssvsrsavevssrcveresexecensvessseiss ovevsstsesssvesseisiexisssssinesseorsormsvenses 19
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting ................0.-20
Q. Hazard Trees, Storm-Damaged Trees, And Dead Tree Removal.............c.cccceeseceeececeeeeeneel
R. Exemptions to Clearing and Vegetation Removal Requirements..................0ccceeeeeeeeeceee sees 20
S. Revegetation Requirements...............c ccc ceeeee eee eec eee eeeeeceesececeeseeserseesesssersenessenereees2l
T, Erosion'and'Sedimentation: Control vecesscsossssscvexvorsessseesversesaaserecsseerectwt sures ices temveaev eat oniasies-cotesse 20
U. SOmS voce eescceeccsecssessessesseseecseceeeeecaeeaeesesaecnecseeesecsessaecsecscesrecsecsesseeseecateaeeaececssssscesessessseeeeese 2]
Ve Water Quality. cocseescevecsressverscuseespesessrcesnecvennctsersnav erensnereneavecoerserarees taseseaneauer vues seo
W. Archacological Site... ec eeceseescesseesseesecssceeseceseceseecsecsscessecseeesasesecesecsssesssecstessscessesssessesesee 2].
16. ACUUUMISHTAEION wrsertacerest tse sserrererces secon teervarec eaeeess si eereeraeee create wena eaanerseronees Tse rae ee eee Tere ET
il
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
A. Administering Bodies and Agents ..........:.c:cescescessesseseessessesceesseseessessecseeseesecssesseesscsecssessessesseene 2]
Bi 'Permits Reguttedscessscescssecasxosesceveugscens acess esaeivsses0 saeco icsaessbencsnecencs once arcecrsssconeceracrescsassoeresnceneo ll
©) PR erMit7A pplication' ......2...c.scvnacesnsesecssuesrsousseevacesecuvcucausertsaeesesieie tases sures sree varsiess fore tseel eres OO
D. Procedure: for Administering: Permits exccesssesvevecesescasscsaccsssswoessesaviessnis sitsaaeuhosese6¥ those eenviecedoeorees DO
E. Special Exceptions. ........cs ce ceecesccssseessceseceseecsecseeeseeessesseeseecssecesseceseeseesseesessssecseescsecsesseseesseens 29)
F, Expiration of Petmifis.ccscscosc cossseieasessssnscatercsvessoesornensienenrcn senna asensencome sent 30
G. Installation of Public Utility Service... cece eeeesesceseeseceecneceseeeesaecsessesesesesecseeeesessessesasereees OO
Hi. Appeals s-csescevesescoenseevovesavers la coueasesuvsstossveessersnecccnsszveas eeevoetsonrsvan sacs ssucpunns on em saiaaeeO SONG OO
L, Emforcement 0.0... ceeeeeesccessccssecsseesseeeseesacsnsecseceseceseecsscesetesseensecsaeseaessesesseesssecsescatesseessecsseenes BO
HR UBS OTS ercscceeneconcsoscanccocecoce acc acoccast cb acc acco HEE EOE OTC CE DSTO ELEC SL
iti
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Town of Roxbury Shoreland Zoning Ordinance
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird
and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect freshwater; to control building sites,
placement of structures and land uses; to conserve shore cover, and visual as well as actual points of
access to inland waters; to conserve natural beauty and open space; and to anticipate and respond to
the impacts of development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 500 feet, horizontal distance, of the
normal high-water line of Ellis (Roxbury) Pond; within 250 feet, horizontal distance, of normal high-
water line of any great pond(other than Ellis (Roxbury) Pond) or river, within 250 feet, horizontal
distance, of the upland edge of a freshwater wetland and all land areas within 75 feet, horizontal
distance, of the normal high-water line of a stream or tributary stream identified on the Official
Shoreland Zoning Map.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or other
structure extending or located below the normal high-water line of a water body or within a wetland.
4. Effective Date
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
amended by the municipal legislative body on June 23, 2022, shall not be effective unless approved by
the Commissioner of the Department of Environmental Protection. A certified copy of the Ordinance,
or Ordinance Amendment, attested and signed by the Municipal Clerk, shall be forwarded to the
Commissioner for approval. If the Commissioner fails to act on this Ordinance or Ordinance
Amendment, within forty-five (45) days of his/her receipt of the Ordinance, or Ordinance
Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period shall be
governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance
Amendment, is approved by the Commissioner.
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of
the Department of Environmental Protection following adoption by the municipal legislative body and
shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on any
, amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is approved
by the Commissioner.
1
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Shoreland Zoning Map(s) which is
(are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than: |
inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be
certified by the attested signature of the Municipal Clerk and shall be located in the municipal
office. In the event the municipality does not have a municipal office, the Municipal Clerk shall be
the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section
8, are made in the district boundaries or other matter portrayed on the Official Shoreland Zoning
Map, such changes shall be made on the Official Shoreland Zoning Map within thirty (30) days
after the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
E. Location of District Boundaries. The depiction of boundaries of the shoreland zone on the
Official Zoning Map is merely illustrative of their location. The exact location and boundaries of
the zone shall be determined by on-site inspection and measurement from the normal high-water
line or upland edge of a wetland.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland Zoning
Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way. and
the boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact
location of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with all
of the regulations herein specified for the district in which it is located, unless a variance is granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except as
otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to become
more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and
the new owner may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do
not involve expansion of the non-conforming use or structure, and such other changes in a
non-conforming use or structure as federal, state, or local building and safety codes may
require.
C. Non-conforming Structures
2
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(1) Expansions. All new principal and accessory structures, excluding functionally water-
dependent uses, must meet the water body, tributary stream, or wetland setback requirements
contained in Section 15(B)(1). A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure and is in
accordance with subparagraphs (a) and (b) below.
(a) Expansion of any portion of a structure within 25 feet of the normal high-water line
of a water body, tributary stream, or upland edge of a wetland is prohibited, even if
the expansion will not increase nonconformity with the water body, tributary stream or
wetland setback requirement. Expansion of an accessory structure that is located
closer to the normal high-water line of a water body, tributary stream, or upland edge
of a wetland than the principal structure is prohibited, even if the expansion will not
increase nonconformity with the water body, tributary stream, or wetland setback
requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal
structure is entirely located less than 25 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland, that structure may be
expanded as follows, as long as all other applicable municipal land use standards are
met and the expansion is not prohibited by Section 12(C)(1).
(i) The maximum total footprint for the principal structure may not be expanded to a size
greater than 800 square feet or 30% larger than the footprint that existed on January
1, 1989, whichever is greater. The maximum height of the principal structure may not
be made greater than 15 feet or the height of the existing structure, whichever is
greater.
(c) All other legally existing nonconforming principal and accessory structures that do not
meet the water body, tributary stream, or wetland setback requirements may be expanded
or altered as follows, as long as other applicable municipal Jand use standards are met and
the expansion is not prohibited by Section 12(C)(1) or Section 12(C)(1)(a), above.
(i) For structures located less than 75 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland, the maximum
combined total footprint for all structures may not be expanded to a size greater
than 1,000 square feet or 30% larger than the footprint that existed on January 1,
1989, whichever is greater. The maximum height of any structure may not be
made greater than 20 feet or the height of the existing structure, whichever is
greater.
(ii) For structures located less than 100 feet from the normal high-water line of a great pond
classified as GPA or a river flowing to a great pond classified as GPA, the maximum
combined total footprint for all structures may not be expanded to a size greater than 1,500
square feet or 30% larger than the footprint that existed on January 1, 1989, whichever is
greater. The maximum height of any structure may not be made greater than 25 feet or the
height of the existing structure, whichever is greater. Any portion of those structures located
less than 75 feet from the normal high-water line of a water body, tributary stream, or upland
edge of a wetland must meet the footprint and height limits in Section 12(C)(1)(b)(i) and
Section 12(C)(1)(c)(i). above.
(itt) In addition to the limitations in subparagraphs (i) and (ii), for structures that are legally
nonconforming due to their location within the Resource Protection District when located at
less than 250 feet from the normal high-water line of a water body or the upland edge of a
wetland, the maximum combined total footprint for all structures may not be expanded to a
size greater than 1,500 square feet or 30% larger than the footprint that existed at the time the
Resource Protection District was established on the lot, whichever is greater. The maximum
height of any structure may not be made greater than 25 feet or the height of the existing
structure, whichever is greater, except that any portion of those structures located less than 75
feet from the normal high-water line of a water body, tributary stream, or upland edge of a
wetland must meet the footprint and height limits in Section 12(C)(1)(b)(i) and Section
12(C)(1)(c)(i), above.
3
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(d) An approved plan for expansion of a nonconforming structure must be recorded by the
applicant with the registry of deeds, within 90 days of approval. The recorded plan must
show the existing and proposed footprint of the non-conforming structure, the existing and
proposed structure height, the footprint of any other structures on the parcel, the shoreland
zone boundary and evidence of approval by the municipal review authority.
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed under a
non-conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(3)
Relocation, below.
(3) Relocation. A non-conforming structure may be relocated within the boundaries of the
parcel on which the structure is located provided that the site of relocation conforms to all
setback requirements to the greatest practical extent as determined by the Planning Board or
its designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shalla structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation in accordance with Section 15(S). In addition, the
area from which the relocated structure was removed must be replanted with vegetation.
Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted,
no one species of tree shall make up more than 50% of the number of trees planted.
Replaced trees must be planted no further from the water or wetland than the trees that
were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged, or
removed must be reestablished within the setback area. The vegetation and/or ground
cover must consist of similar native vegetation and/or ground cover that was disturbed,
destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or
a combination thereof.
(4) Reconstruction or Replacement. Any non-conforming structure which is located less than
the required setback from a water body, tributary stream, or wetland and which is removed, or
damaged or destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or replaced
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in compliance
with the water body, tributary stream or wetland setback requirement to the greatest practical
extent as determined by the Planning Board or its designee in accordance with the purposes of
this Ordinance. In no case shall a structure be reconstructed or replaced so as to increase its
non-conformity. If the reconstructed or replacement structure is less than the required setback it
shall not be any larger than the original structure, except as allowed pursuant to Section 12(C)(1)
above, as determined by the non-conforming footprint of the reconstructed or replaced structure
at its new location. If the total footprint of the original structure can be relocated or
reconstructed beyond the required setback area, no portion of the relocated or reconstructed
structure shall be replaced or constructed at less than the setback requirement for a new
4
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
structure. When it is necessary to remove vegetation in order to replace or reconstruct a
structure, vegetation shall be replanted in accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water body,
tributary stream, or wetland and which is removed by 50% or less of the market value, or
damaged or destroyed by 50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Planning
Board within one year of such damage. destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(3) above, the physical condition and type of foundation present, if any.
(5) Change of Use of a Non-conforming Structure. The use of a non-conforming structure
may not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources than
the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover,
visual and actual points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources, and commercial fishing and maritime activities, and
other functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that the
structure has been used or maintained for residential purposes during the preceding five (5)
year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the subject
and adjacent properties and resources, including water dependent uses in the CFMA district,
than the former use, as determined by the Planning Board. The determination of no greater
adverse impact shall be made according to criteria listed in Section 12(C)(4) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance, provided
that such lot is in separate ownership and not contiguous with any other lot in the same
ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure exists
on each lot, the non-conforming lots may be conveyed separately or together, provided that
the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the
State of Maine Subsurface Wastewater Disposal Rules are complied with.
5
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are
in single or jomt ownership of record on July 23, 1990 ot theirafter, if any of these lots do not
individually meet the dimensional requirements of this Ordinance or subsequent amendments,
and if one or more of the lots are vacant or contain no principal structure the lots shall be
combined to the extent necessary to meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons and recorded in the registry of deeds on or
before July 23, 1990 if the lot is served by a public sewer or can accommodate a subsurface
sewage disposal system in conformance with the State of Maine Subsurface Wastewater
Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone, exclusive of the Stream Protection District, except that areas
which are currently developed and areas which meet the criteria for the Limited Commercial
District need not be included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands and
wetlands associated with great ponds and rivers, which are rated "moderate" or "high" value
waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic
Information System (GIS) data layer.
(2) Floodplains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the 100 year floodplain as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially connected
to a water body during the period of normal high water.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement.
B. Limited Residential District. The Limited Residential District includes those areas suitable for
residential and recreational development. It includes areas other than those in the Resource
Protection District, or Stream Protection District, and areas which are used less intensively than
those in the Limited Commercial] District.
C. Limited Commercial District. The Limited Commercial District includes areas of mixed, light
commercial and residential uses, exclusive of the Stream Protection District. This district includes
6
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
areas of two or more contiguous acres in size devoted to a mix of residential and low intensity
business and commercial uses. Industrial uses are prohibited.
D. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream, exclusive of
those areas within five-hundred (500) feet, horizontal distance, of the normal high-water line of
Ellis (Roxbury) Pond, two-hundred and fifty (250) feet, horizontal distance, of the normal high-
water line of a great pond, or river, or within two hundred and fifty (250) feet, horizontal distance,
of the upland edge of a freshwater wetland. Where a stream and its associated shoreland area
are located within two-hundred and fifty (250) feet, horizontal distance, of the above water bodies
or wetlands, that land area shall be regulated under the terms of the shoreland district associated
with that water body or wetland.
14, Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the Shoreland
Zone, shall conform with all of the applicable land use standards in Section 15. The district designation
for a particular site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes- Allowed (no permit required but the use must comply with all applicable land use
standards.)
No- Prohibited
PB- Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI- Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection LR- Limited Residential
LC- Limited Commercial SP - Stream Protection
7
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICT
SP RP LR Lc
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking Yes yes yes yes
2. Motorized vehicular traffic on existing roads and trails Yes yes yes yes
5. Wildlife management practices Yes yes yes yes
6. Soil and water conservation practices Yes yes yes yes
7. Mineral exploration No yes yes yes
8. Mineral extraction including sand and gravel extraction No PB? PB PB
9. Surveying and resource analysis Yes yes yes yes
10. Emergency operations Yes yes yes yes
11. Agriculture Yes PB yes yes
12. Aquaculture PB PB PB yes
13. Principal structures and uses PB
A One and two family residential, including driveways pp4 pp? PB
B. Multi-unit residential No No PB PB
Cc. Commercial No No® No° PB
D. Industrial No no no no
E. Governmental and institutional No no PB PB
F.Small non-residential facilities for educational, scientific, or nature PB? PB PB PB
interpretation purposes
14, Structures accessory to allowed uses PB PB PB PB
15. Piers, docks, wharfs, bridges and other structures and uses extending
over or below the normal high-water line or within a wetland
a. Temporary ceo" ceo" ceo" cE"
b. Permanent PB PB PB PB
16. Conversions of seasonal residences to year-round residences LPI LPI LPI LPI
17. Home occupations PB PB PB CEO
18. Private sewage disposal systems for allowed uses LPI LPI LPI LPI
19. Essential services PB PB PB PB
A Roadside distribution lines (34.5kV and lower) PB PB Yes Yes
B. Non-roadside or cross-country distribution lines involving ten poles or less in PB PB PB PB
the shoreland zone
C. Non-roadside or cross-country distribution lines involving eleven or more PB PB PB PB
poles in the shoreland zone
D. Other essential services PB PB PB PB
20. Service drops, as defined, to allowed uses Yes yes yes Yes
21. Public and private recreational areas involving minimal structural development PB PB PB PB
22. Individual, private campsites PB PB PB PB
23. Campgrounds No No PB PB
ee aera reese eeeieeencan ea intraarea ne ee tonne e eS ane eT ie I Lhe
24. Road construction PB No PB PB
25. Parking facilities No No PB PB
26. Marinas PB no PB PB
28. Filling and earth moving of >10 cubic yards PB PB PB PB
29. Signs Yes yes yes Yes
30. Uses similar to allowed uses PB PB PB PB
31. Uses similar to uses requiring a PB permit PB PB PB PB
'in RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
*Requires permit from the Planning Boardif more than 100 square feet of surface area, in total, is disturbed.
4n RP not allowed in areas so designated because of wildlife value.
'provided that a variance from the setback requirement is obtained from the Board of Appeals.
5see further restrictions in Section 15( L)(2).
SExcept when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
except as provided in Section 15(H)(4).
Ssingle family residential structures may be allowed by special exception only according to the provisions of Section 16(E), Special Exceptions. Two-
family residential structures are prohibited.
*Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
10 . ; 5 ' ' '. , a .
Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
"permit not required' but must file a written "notice of intent to construct" with CEO.
8
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
15. Land Use Standards. All land use activities within the shoreland zone shall conform with the following
provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot Minimum
Area (sq. ft.) Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit 87,120 (2 Acres) 200
(b) Governmental, Institutional, Commercial or Industrial per principal structure
87,120 (2 Acres) 300
(c) Public and Private Recreational Facilities 87,120 (2 Acres) 200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and land beneath
roads serving more than two (2) lots shall not be included toward calculating minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a separate tract or
parcel of land unless such road was established by the owner of land on both sides thereof after
September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal distance, of the
normal high-water line of a water body or upland edge of a wetland shall be equal to or greater than the
shore frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial or industrial
structure or use, or combination thereof, is constructed or established on a single parcel, all dimensional
requirements shall be met for each additional dwelling unit, principal structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet, horizontal
distance, from the normal high-water line of great ponds classified GPA and rivers that flow to great
ponds classified GPA, and seventy-five (75) feet, horizontal distance, from the normal high-water line of
other water bodies, tributary streams, or the upland edge of a wetland. In the Resource Protection District
the setback requirement shall be 250 feet, horizontal distance, except for structures, roads, parking spaces
or other regulated objects specifically allowed in that district in which case the setback requirements
specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to structures which
require direct access to the water body or wetland as an operational necessity, such as piers, docks
and retaining walls, nor to other functionally water-dependent uses.
9
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(b) On a non-conforming lot of record on which only a residential structure exists, and it is not possible to
place an accessory structure meeting the required water body, tributary stream or wetland setbacks,
the Planning Board may issue a permit to place a single accessory structure, with no utilities, for the
storage of yard tools and similar equipment. Such accessory structure shall not exceed eighty (80)
square feet in area nor eight (8) feet in height, and shall be located as far from the shoreline or
tributary stream as practical and shall meet all other applicable standards, including lot coverage and
vegetation clearing limitations. In no case shall the structure be located closer to the shoreline or
tributary stream than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in the
Resource Protection, Limited Residential, Limited Commercial, and Stream Protection Districts, shall not
exceed thirty-five (35) feet in height. This provision shall not apply to structures such as transmission
towers, windmills, antennas, and similar structures having no floor area.
(2A) All new principal and accessory structures shall be setback at least (10) feet from the side lot line.
(3) The lowest floor elevation or openings of all buildings and structures, including basements, shall be
elevated at least one foot above the elevation of the 100 year flood, the flood of record, or in the absence
of these, the flood as defined by soil types identified as recent flood-plain soils. In those municipalities that
participate in the National Flood Insurance Program and have adopted the April 2005 version, or later
version, of the Floodplain Management Ordinance, accessory structures may be placed in accordance with
the standards of that ordinance and need not meet the elevation requirements of this paragraph.
Non-vegetated surfaces shall not exceed a total of twenty (20) percent of the portion of the lot located
within the shoreland zone. This limitation does not apply to public boat launching facilities regardless of
the district in which the facility is located.
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not limited to the
following: structures, driveways, parking areas, and other areas from which vegetation has been
removed. Naturally occurring ledge and rock outcroppings are not counted as nonvegetated surfaces
when calculating lot coverage for lots of record on March 24, 1990 and in continuous existence since
that date.
(4) Retaining walls that are not necessary for erosion control shall meet the structure setback requirement,
except for low retaining walls and associated fill provided all of the following conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The walls) is(are) at least 25 feet, horizontal distance, from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site eroding from
lack of naturally occurring vegetation, and which cannot be stabilized with vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
10
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams, and tributary
streams, as designated on the Federal Emergency Management Agency's (FEMA) Flood Insurance
Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of these, by
soil types identified as recent flood plain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination thereof, and no
further structural development will occur within the setback area, including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal high-water
line of a water body, tributary stream, or upland edge of a wetland when a natural buffer area does
not exist. The buffer area must meet the following characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation. Where natural
ground cover is lacking the area must be supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide for effective
infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured perpendicularly to
the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the buffer;
(5) Notwithstanding the requirements stated above, stairways or similar structures may be allowed with a
permit from the Planning Board, to provide shoreline access in areas of steep slopes or unstable soils
provided: that the structure is limited to a maximum of four (4) feet in width; that the structure does not
extend below or over the normal high-water line of a water body or upland edge of a wetland, (unless
permitted by the Department of Environmental Protection pursuant to the Natural Resources Protection
Act, 38 M.R.S.A. section 480-C); and that the applicant demonstrates that no reasonable access
alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the
Normal High-Water Line of a Water Body or Within a Wetland, and Shoreline Stabilization.
(1) No more than one pier, dock, wharf or similar structure extending or located below the normal high-water
line of a water body or within a wetland is allowed on a single lot; except that when a single lot contains at
least twice the minimum shore frontage as specified in Section 15(A), a second structure may be allowed
and may remain as long as the lot is not further divided.
(2) Access from shore shall be developed on soils appropriate for such use and constructed so as to control
erosion.
(3) The location shall not interfere with existing developed or natural beach areas.
11
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(4) The facility shall be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be consistent with
the surrounding character and uses of the area. A temporary pier, dock or wharf shall not be wider than
six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure extending beyond
the normal high-water line of a water body or within a wetland unless the structure requires direct access
to the water body or wetland as an operational necessity.
(7) New permanent piers and docks shall not be permitted unless it is clearly demonstrated to the Planning
Board that a temporary pier or dock is not feasible, and a permit has been obtained from the Department
of Environmental Protection, pursuant to the Natural Resources Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure extending beyond the
normal high-water line of a water body or within a wetland shall be converted to residential dwelling units
in any district.
(9) Structures built on, over or abutting a pier, wharf, dock or other structure extending beyond the normal
high-water line of a water body or within a wetland shall not exceed twenty (20) feet in height above the
pier, wharf, dock or other structure.
(10) Vegetation may be removed in excess of the standards in Section 15(P) of this ordinance in order to
conduct shoreline stabilization of an eroding shoreline, provided that a permit is obtained from the
Planning Board. Construction equipment must access the shoreline by barge when feasible as
determined by the Planning Board.
(a) When necessary, the removal of trees and other vegetation to allow for construction equipment access to
the stabilization site via land must be limited to no more than 12 feet in width. When the stabilization
project is complete the construction equipment accessway must be restored.
(b) Revegetation must occur in accordance with Section 15(S).
NOTE: A permit pursuant to the Natural Resource Protection Act is required from the Department of
Environmental Protection for Shoreline Stabilization activities.
NOTE: A municipality may adopt a provision such as paragraph 11 below to allow the construction of
decks over a river in a downtown revitalization project, in accordance with 38 M.R.S.A. § 439-A(4-
B).
(11). A deck over a river may be exempted from the shoreland setback requirements if it is part of a
downtown revitalization project that is defined in a project plan approved by the legislative body of the
municipality, and may include the revitalization of structures formerly used as mills that do not meet the
structure setback requirements, if the deck meets the following requirements:
(a) The total deck area attached to the structure does not exceed 700 square feet;
12
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(b) The deck is cantilevered over a segment of a river that is located within the boundaries of
the downtown revitalization project;
(c) The deck is attached to or accessory to an allowed commercial use in a structure that was
constructed prior to 1971 and is located within the downtown revitalization project;
(d) The construction of the deck complies with all other applicable standards, except the shoreline
setback requirements in section 15(B); and
(e) The construction of the deck complies with all other state and federal laws.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads
and driveways, for each site. Land supporting wetland vegetation, and land below the normal high-
water line of a water body shall not be included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and service
buildings shall be set back a minimum of one hundred (100) feet, horizontal distance, from the normal
high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds are allowed
provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand (30,000) square
feet of lot area within the shoreland zone, whichever is less, may be permitted.
(2) When an individual private campsite is proposed on a lot that contains another principal use and/or
structure, the lot must contain the minimum lot dimensional requirements for the principal structure
and/or use, and the individual private campsite separately.
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or tent platform,
shall be set back one hundred (100) feet, horizontal! distance, from the normal high-water line of a great
pond classified GPA or river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall not be
located on any type of permanent foundation except for a gravel pad, and no structure except a canopy
shall be attached to the recreational vehicle.
13
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a Resource
Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage disposal shall be
required for each campsite and shall be approved by the Local Plumbing Inspector. Where disposal is
off-site, written authorization from the receiving facility or land owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred and
twenty (120) days per year, all requirements for residential structures shall be met, including the
installation of a subsurface sewage disposal system in compliance with the State of Maine Subsurface
Wastewater Disposal Rules unless served by public sewage facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial uses are prohibited
within the shoreland zone adjacent to great ponds classified GPA, and rivers and streams which flow to
great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts normally
associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on same property as use occurs
and except for storage and sales associated with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas
14
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for structures for the
district in which such areas are located. The setback requirement for parking areas serving public boat
launching facilities shall be no less than fifty (50) feet, horizontal distance, from the shoreline or tributary
stream if the Planning Board finds that no other reasonable alternative exists further from the shoreline
or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and where
feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except that
parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or driveways
and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance, from the
normal high-water line of a great pond classified GPA or a river that flows to a great pond classified GPA,
and seventy-five (75) feet, horizontal distance from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland unless no reasonable alternative exists as determined by
the Planning Board. If no other reasonable alternative exists, the road and/or driveway setback
requirement shall be no less than fifty (50) feet, horizontal distance, upon clear showing by the applicant
that appropriate techniques will be used to prevent sedimentation of the water body, tributary stream, or
wetland. Such techniques may include, but are not limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts placed so as to avoid sedimentation of the
water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be increased by ten
(10) feet, horizontal distance, for each five (5) percent increase in slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways that provide
access to permitted structures and facilities located nearer to the shoreline or tributary stream due to an
operational necessity, excluding temporary docks for recreational uses. Roads and driveways providing
access to permitted structures within the setback area shall comply fully with the requirements of Section
15(H)(1) except for that portion of the road or driveway necessary for direct access to the structure.
(2) Existing roads may be expanded within the legal road right of way regardless of their setback from a
water body, tributary stream or wetland.
(3) New permanent roads are not allowed within the shoreland zone along Significant River Segments except:
15
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(a) To provide access to structures or facilities within the zone; or
(b) When the applicant demonstrates that no reasonable alternative route exists outside the shoreland
zone. When roads must be located within the shoreland zone they shall be set back as far as
practicable from the normal high-water line and screened from the river by existing vegetation.
(4) New roads and driveways are prohibited in a Resource Protection District except that the Planning Board
may grant a permit to construct a road or driveway to provide access to permitted uses within the district.
A road or driveway may also be approved by the Planning Board in a Resource Protection District, upon a
finding that no reasonable alternative route or location is available outside the district. When a road or
driveway is permitted in a Resource Protection District the road and/or driveway shall be set back as far
as practicable from the normal high-water line of a water body, tributary stream, or upland edge of a
wetland.
(5) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1) vertical, and
shall be graded and stabilized in accordance with the provisions for erosion and sedimentation control
contained in Section 15(T).
(6) Road and driveway grades shall be no greater than ten (10) percent except for segments of less than
two hundred (200) feet.
(7) In order to prevent road and driveway surface drainage from directly entering water bodies, tributary
streams or wetlands, roads and driveways shall be designed, constructed, and maintained to empty onto
an unscarified buffer strip at least (50) feet plus two times the average slope, in width between the
outflow point of the ditch or culvert and the normal high-water line of a water body, tributary stream, or
upland edge of a wetland. Surface drainage which is directed to an unscarified buffer strip shall be
diffused or spread out to promote infiltration of the runoff and to minimize channelized flow of the
drainage through the buffer strip.
(8) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a manner
effective in directing drainage onto unscarified buffer strips before the flow gains sufficient volume or
head to erode the road, driveway, or ditch. To accomplish this, the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along the road, or
driveway at intervals no greater than indicated in the following table:
Grade Spacing
(Percent) (Feet)
0-2 . 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
16
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten (10) percent
or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be placed at
approximately a thirty (30) degree angle downslope from a line perpendicular to the centerline of the
road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for effective
functioning, and their inlet and outlet ends shall be stabilized with appropriate materials.
(9) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control installations
associated with roads and driveways shall be maintained on a regular basis to assure effective
functioning.
(10) No Oil shall be spread on Gravel Roads
I Signs. The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Limited Residential and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such signs shall
not exceed six (6) square feet in area and shall not exceed two (2) signs per premises. In the Limited
Commercial District, however, such signs shall not exceed sixteen (16) square feet in area. Signs
relating to goods or services not sold or rendered on the premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and shall not
exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to the sale,
rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number provided that
no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights. |
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff from the site in
excess of the natural predevelopment conditions. Where possible, existing natural runoff control
features, such as berms, swales, terraces and wooded areas, shall be retained in order to reduce runoff
and encourage infiltration of stormwaters.
17
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of Maine
Subsurface Wastewater Disposal Rules, and the following: a) clearing or removal of woody vegetation
necessary to site a new system and any associated fill extensions, shall not extend closer than seventy -
five (75) feet, horizontal distance, from the normal high-water line of a water body or the upland edge of
a wetland and b) a holding tank is not allowed for a first-time residential use in the shoreland zone.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways and existing
service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed in a Resource
Protection or Stream Protection District, except to provide services to a permitted use within said
district, or except where the applicant demonstrates that no reasonable alternative exists. Where
allowed, such structures and facilities shall be located so as to minimize any adverse impacts on
surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related equipment
may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of mineral
resources shall be accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from the Planning
Board shall be required for mineral exploration which exceeds the above limitation. All excavations,
including test pits and holes, shall be immediately capped, filled or secured by other equally effective
measures to restore disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit is granted.
Such plan shall describe in detail procedures to be undertaken to fulfill the requirements of Section 15
(M)(4) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall be permitted
within one hundred (100) feet, horizontal distance, of the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and within seventy-five (75) feet,
horizontal distance, of the normal high-water line of any other water body, tributary stream, or the upland
edge of a wetland. Extraction operations shall not be permitted within seventy-five (75) feet, horizontal
distance, of any property line without written permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any extraction site, which
operations shall be deemed complete when less than one hundred (100) cubic yards of materials are
18
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
removed in any consecutive twelve (12) month period, ground levels and grades shall be established in
accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved location, or shall
be buried on-site. Only materials generated on-site may be buried or covered on-site.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be reseeded and
stabilized with vegetation native to the area. Additional topsoil or loam shall be obtained from off-
site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions as are
necessary to minimize the adverse impacts associated with mineral extraction operations on surrounding
uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization Guidelines
published by the former Maine Department of Agriculture on November 1, 2001, and the Nutrient
Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of a great
pond classified GPA or a river flowing to a great pond classified GPA, or within seventy-five (75) feet
horizontal distance, of other water bodies, tributary streams, or wetlands. All manure storage areas
within the shoreland zone must be constructed or modified such that the facility produces no discharge
of effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in surface
area, within the shoreland zone shall require a Conservation Plan to be filed with the Planning Board.
Non-conformance with the provisions of said plan shall be considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of the normal
high-water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance, from
other water bodies; nor within twenty-five (25) feet, horizontal distance, of tributary streams and
freshwater wetlands. Operations in existence on the effective date of this ordinance and not in
conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100) feet,
horizontal distance, of the normal high-water line of a great pond classified GPA; within seventy-five
(75) feet, horizontal distance, and of other water bodies, nor; within twenty-five (25) feet, horizontal
distance, of tributary streams and freshwater wetlands. Livestock grazing associated with ongoing farm
activities, and which are not in conformance with the above setback provisions may continue, provided
that such grazing is conducted in accordance with a Conservation Plan that has been filed with the
Planning Board.
O. Timber Harvesting -Repealed
19
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Timber harvesting is regulated by the Maine Forest Service.
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) Ina Resource Protection District abutting a great pond, there shall be no cutting of vegetation within the
strip of land extending 75 feet, horizontal distance, inland from the normal high-water line, except to
remove hazard trees as described in section Q.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be limited to
that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, within a strip of land extending one-hundred (100)
feet, horizontal distance, inland from the normal high-water line of a great pond classified GPA or a river
flowing to a great pond classified GPA, or within a strip extending seventy-five (75) feet, horizontal
distance, from any other water body, tributary stream, or the upland edge of a wetland, a buffer strip of
vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or other
existing woody vegetation if a forested canopy is not present) as measured from the outer limits of
the tree or shrub crown. However, a single footpath not to exceed six (6) feet in width as measured
between tree trunks and/or shrub stems is allowed for accessing the shoreline provided that a
cleared line of sight to the water through the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a welldistributed stand of
trees and other natural vegetation is maintaned. For the purposes of Section 15(P)(2)(b) a "well-
distributed stand of trees" adjacent to a great pond classified GPA or a river or stream flowing to a
great pond classified GPA, shall be defined as maintaining a rating score of 24 or more in each 25-
foot by 50-foot rectangular (1250 square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above Points
Ground Level (inches)
2-<4in. 1
4-- <8 in. 2
8-< 12 in. 4
12 in. or greater 8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand of trees" is
defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot rectangular area.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner or lessee
proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed except as
otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to the minimum
points required or as otherwise allowed by is Ordinance;
20
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-foot
rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining existing
vegetation under three (3) feet in height and other ground cover and retaining at least five (5)
saplings less than two (2) inches in diameter at four and one half (4 4) feet above ground level for
each 25-foot by 50-foot rectangle area. If five saplings do not exist, no woody stems less than two
(2) inches in diameter can be removed until 5 saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4) inches
or more in diameter, measured at 4 1/2 feet above ground level may be removed in any ten (10)
year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in height
and other ground cover, including leaf litter and the forest duff layer, shall not be cut, covered, or
removed, except to provide for a footpath or other permitted uses as described in Section 15(P)
paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, dead or
hazard trees results in the creation of cleared openings, these openings shall be replanted with native
tree species in accordance with Section Q, below, unless existing new tree growth is present.
(f) In order to maintain the vegetation in the shoreline buffer, clearing or removal of vegetation for
allowed activities, including associated construction and related equipment operation, within or
outside the shoreline buffer, must comply with the requirements of Section 15.P(2).
Section 15(P)(2) does not apply to those portions of public recreational facilities adjacent to public
swimming areas as long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond classified GPA
or a river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance, from
the normal high-water line of any other water body, tributary stream, or the upland edge of a wetland,
there shall be allowed on any lot, in any ten (10) year period, selective cutting of not more than forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground
level Tree removal in conjunction with the development of permitted uses shall be included in the forty
(40) percent calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and accessory
structures, driveways, lawns and sewage disposal areas, exceed in the aggregate, 25% of the lot area
within the shoreland zone or ten thousand (10,000) square feet, whichever is greater, including land
previously cleared. This provision applies to the portion of a lot within the shoreland zone, including the
buffer area.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be enlarged, except as
allowed by this Ordinance.
21
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other woody
vegetation shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal.
(1) Hazard trees in the shoreland zone may be removed without a permit after consultation with the
Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in the tree
canopy greater than two hundred and fifty (250) square feet, replacement with native tree species is
required, unless there is new tree growth already present. New tree growth must be as near as
practicable to where the hazard tree was removed and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level. If new growth is not present, then
replacement trees shall consist of native species and be at least four (4) feet in height, and be no
less than two (2) inches in diameter. Stumps may not be removed, except that stump grinding is
allowed provided that the root system is kept intact to retain the soil.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above
ground level in any ten (10) year period, and/or results in cleared openings exceeding twenty-five
(25) percent of the lot area within the shoreland zone, or ten thousand (10,000) square feet,
whichever is greater, replacement with native tree species is required, unless there is new tree
growth already present. New tree growth must be as near as practicable to where the hazard tree
was removed and be at least two (2) inches in diameter, measured at four and one half (4.5) feet
above the ground level. If new growth is not present, then replacement trees shall consist of native
species and be at least two (2) inches in diameter, measured at four and one half (4.5) feet above
the ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible without the need
for replanting or a permit, as long as the removal does not result in the creation of new lawn areas,
or other permanently cleared areas, and stumps are not removed, except that stump grinding is
allowed provided that the root system is kept intact to retain the soil. For the purposes of this
provision dead trees are those trees that contain no foliage during the growing season.
(d) The Code Enforcement Officer may require the property owner to submit an evaluation from a
licensed forester or arborist before any hazard tree can be removed within the shoreland zone.
(e) The Code Enforcement Officer may require more than a one--for-one replacement for hazard trees
removed that exceed eight (8) inches in diameter measured at four and one half (4.5) feet above the
ground level.
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
22
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared opening
in the tree canopy greater than two hundred and fifty (250) square feet, replanting is not required,
but the area shall be required to naturally revegetate, and the following requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new lawn areas, or other
permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed, except that stump grinding is allowed
provided that the root system is kept intact to retain the soil;
(iii) Limbs damaged from a storm event may be pruned even if they extend beyond the bottom one-third
(1/3) of the tree; and
(iv) If after one growing season, no natural regeneration or regrowth is present, replanting of native tree
seedlings or saplings is required at a density of one seedling per every eighty (80) square feet of lost
canopy.
(b) Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of the volume
of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above the
ground level in any ten (10) year period, or results, in the aggregate, in cleared openings exceeding
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet, whichever is
greater, and no natural regeneration occurs within one growing season, then native tree seedlings or
saplings shall be replanted on a one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in
Section 15(P), provided that all other applicable requirements of this chapter are complied with, and
the removal of vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the maintenance of
legally existing areas that do not comply with the vegetation standards in this chapter, such as but
not limited to cleared openings in the canopy or fields. Such areas shall not be enlarged, except as
allowed by this section. If any of these areas, due to lack of removal of vegetation every two (2)
years, reverts back to primarily woody vegetation, the requirements of Section 15(P) apply;
(2) The removal of vegetation from the location of allowed structures or allowed uses, when the
shoreline setback requirements of section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated with an allowed
public recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best management
practices are utilized, and provided all requirements of section 15(N) are complied with;
(5) The removal of vegetation associated with brownfields or voluntary response action program
(VRAP) projects provided that the removal of vegetation is necessary for remediation activities to
23
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
clean-up contamination on a site in a general development district, commercial fisheries and
maritime activities district or other equivalent zoning district approved by the Commissioner that is
part of a state or federal brownfields program or a voluntary response action program pursuant 38
M.R.S.A section 343-E, and that is located along:
(a) A coastal wetland; or
(b) A river that does not flow to a great pond classified as GPA pursuant to 38 M.R.S.A section 465-A.
(6) The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled or
tracked motorized equipment is operated and stored at least twenty-five (25) feet, horizontal
distance, from the shoreline, except that wheeled or tracked equipment may be operated or stored
on existing structural surfaces, such as pavement or gravel;
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the shoreline occurs
via hand tools; and
(c) If applicable clearing and vegetation removal standards are exceeded due to the removal of non-
native invasive species vegetation, the area shall be revegetated with native species to achieve
compliance.
(7) The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and their agents.
S. Revegetation Requirements.
When revegetation is required in response to violations of the vegetation standards set forth in Section
15(P), to address the removal of non- native invasive species of vegetation, or as a mechanism to
allow for development that may otherwise not be permissible due to the vegetation standards,
including removal of vegetation in conjunction with a shoreline stabilization project, the revegation
must comply with the following requirements.
(1) The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include a scaled
site plan, depicting where vegetation was, or is to be removed, where existing vegetation is to
remain, and where vegetation is to be planted, including a list of all vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed and at a density comparable to the pre-existing vegetation, except where a
shoreline stabilization activity does not allow revegetation to occur in the same area and at a density
comparable to the pre-existing vegetation, in which case revegetation must occur along the same
segment of shoreline and as close as possible to the area where vegetation was removed:
24
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If the
activity or revegetation is not completed before the expiration of the permit, a new revegetation plan
shall be submitted with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) Alltrees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must at a minimum consist of saplings;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different species shall be
used;
(d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to plant trees and
saplings in the same area where trees or saplings were removed, then trees or sapling must be
planted in a location that effectively reestablishes the screening between the shoreline and
structures; and
(f) A survival rate of at least eighty (80) percent of planted trees or saplings is required for a minimum
five (5) years period.
(5) Revegetation activities must meet the following requirements for woody vegetation and other
vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced with native
noninvasive species of woody vegetation and vegetation under three (3) feet in height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in quantities and
variety sufficient to prevent erosion and provide for effective infiltration of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3) different
species shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody vegetation plants; and
(e) Survival of planted woody vegetation and vegetation under three feet in height must be sufficient to
remain in compliance with the standards contained within this chapter for minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and ground
cover:
(a) All ground vegetation and ground cover removed must be replaced with native herbaceous
vegetation, in quantities and variety sufficient to prevent erosion and provide for effective infiltration
of stormwater;
25
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(b) Where necessary due to a lack of sufficient ground cover, an area must be supplemented with a
minimum four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion and provide for
effective infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to remain in
compliance with the standards contained within this chapter for minimum of five (5) years.
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which result in
unstabilized soil conditions and which require a permit shall also require a written soil erosion and
sedimentation control plan. The plan shall be submitted to the permitting authority for approval and shall
include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the topography
and soils of the site. Areas of steep slopes where high cuts and fills may be required shall be avoided
wherever possible, and natural contours shall be followed as closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project involving
land disturbance, and shall be in operation during all stages of the activity. The amount of exposed soil at
every phase of construction shall be minimized to reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week from the
time it was last actively worked, by use of riprap, sod, seed, and mulch, or other effective measures. In
all cases permanent stabilization shall occur within nine (9) months of the initial date of exposure. In
addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred (500)
square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be required to
maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the water. Such
measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion from water
flowing through them. Drainageways shall be designed and constructed in order to carry water from a
twenty five (25) year storm or greater, and shall be stabilized with vegetation or lined with riprap.
26
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
U. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe erosion, mass soil
movement, improper drainage, and water pollution, whether during or after construction. Proposed uses
requiring subsurface waste disposal, and commercial or industrial development and other similar intensive
land uses, shall require a soils report based on an on-site investigation and be prepared by state-certified
professionals. Certified persons may include Maine Certified Soil Scientists, Maine Registered Professional
Engineers, Maine State Certified Geologists and other persons who have training and experience in the
recognition and evaluation of soil properties. The report shall be based upon the analysis of the
characteristics of the soil and surrounding land and water areas, maximum ground water elevation, presence
of ledge, drainage conditions, and other pertinent data which the evaluator deems appropriate. The soils
report shall include recommendations for a proposed use to counteract soil limitations where they exist.
V. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair designated uses or the
water classification of the water body, tributary stream or wetland.
W. Archaeological Site. Any proposed land use activity involving structural development or soil disturbance
on or adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as
determined by the permitting authority, shall be submitted by the applicant to the Maine Historic Preservation
Commission for review and comment, at least twenty (20) days prior to action being taken by the permitting
authority. The permitting authority shall consider comments received from the Commission prior to
rendering a decision on the application.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed annually by
July Ist.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of 30-A
M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first obtaining a
permit, engage in any activity or use of land or structure requiring a permit in the district in which such
activity or use would occur; or expand, change, or replace an existing use or structure; or renew a
discontinued nonconforming use. A person who is issued a permit pursuant to this Ordinance shall have a
copy of the permit on site while the work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
27
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and the
crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is conducted by an
archaeologist listed on the State Historic Preservation Officer's level 1 or level 2 approved list, and
unreasonable erosion and sedimentation is prevented by means of adequate and timely temporary and
permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by other law or
ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan, on a form
provided by the municipality, to the appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show evidence of right, title or interest
in the property or by an agent, representative, tenant, or contractor of the owner with authorization from
the owner to apply for a permit hereunder, certifying that the information in the application is complete
and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as appropriate,
shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed application for a
plumbing permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted
whenever the nature of the proposed structure or use would require the installation of a subsurface
sewage disposal system.
(5) 38 M.R.S. § 439-A(10) Photographic record required. A municipal ordinance adopted pursuant to this
article must require an applicant for a permit for development within the shoreland zone to provide to the
municipal permitting authority preconstruction photographs and, no later than 20 days after completion of the
development, postconstruction photographs of the shoreline vegetation and development site.
D. Procedure for Administering Permits. Within 45 days of the date of receiving a written application, the
Planning Board or Code Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing
either that the application is a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete. The Planning Board or the Code
Enforcement Officer, as appropriate, shall approve, approve with conditions, or deny all permit applications
in writing within 45 days of receiving a completed application. However, if the Planning Board has a waiting
list of applications, a decision on the application shall occur within 45 days after the first available date on the
Planning Board's agenda following receipt of the completed application, or within 45 days of the public
hearing, if the proposed use or structure is found to be in conformance with the purposes and provisions of
this Ordinance.
28
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
The applicant shall have the burden of proving that the proposed land use activity is in conformity with the
purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an application
or approve it with conditions if it makes a positive finding based on the information presented that the
proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will not adversely affect existing commercial fishing or maritime activities in a Commercial
Fisheries/Maritime Activities district;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be stated in
writing. No approval shall be granted for an application involving a structure if the structure would be
located in an unapproved subdivision or would violate any other local ordinance, or regulation or statute
administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting structure
setback requirements, the Planning Board may approve a permit for a single family residential structure in a
Resource Protection District provided that the applicant demonstrates that all of the following conditions are
met:
(1) There is no location on the property, other than a location within the Resource Protection District, where
the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded in the
registry of deeds of the county in which the lot is located before the adoption of the Resource Protection
District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
29
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(b) Located outside the floodway of the 100-year flood-plain along rivers and artificially formed great
ponds along rivers and outside the velocity zone in areas subject to tides, based on detailed flood
insurance studies and as delineated on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements,
are elevated at least one foot above the 100-year flood-plain elevation; and the development is
otherwise in compliance with any applicable municipal floodplain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is deemed to
be 1/2 the width of the 100-year flood-plain.
(4) The total footprint, including cantilevered or similar overhanging extensions, of all principal and
accessory structures is limited to a maximum of 1,500 square feet. This limitation shall not be altered by
variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal high-water
line of a water body, tributary stream or upland edge of a wetland to the greatest practical extent, but
not less than 75 feet, horizontal distance. In determining the greatest practical extent, the Planning
Board shall consider the depth of the lot, the slope of the land, the potential for soil erosion, the type and
amount of vegetation to be removed, the proposed building site's elevation in regard to the flood-plain,
and its proximity to moderate-value and high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial start is not
made in construction or in the use of the property during that period. If a substantial start is made within one
year of the issuance of the permit, the applicant shall have two additional year's to complete the project, at
which time the permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any utility
company of any kind may not install services to any new structure located in the shoreland zone unless
written authorization attesting to the validity and currency of all local permits required under this or any
previous Ordinance has been issued by the appropriate municipal officials or other written arrangements
have been made between the municipal officials and the utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis, where it is
alleged by an aggrieved party that there is an error in any order, requirement, decision, or
determination made by, or failure to act by, the Planning Board in the administration of this Ordinance;
and to hear and decide administrative appeals on a de novo basis where it is alleged by an aggrieved
party that there is an error in any order, requirement, decision or determination made by, or failure to
act by, the Code Enforcement Officer in his or her review of and action on a permit application under
this Ordinance. Any order, requirement, decision or determination made, or failure to act, in the
enforcement of this ordinance is not appealable to the Board of Appeals.
30
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in this
Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited to, lot width,
structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the specific
provision which has created the non-conformity and from which relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship. The term
"undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is granted;
b. That the need for a variance is due to the unique circumstances of the property and not to the
general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality; and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals, or the codes enforcement
officer if authorized in accordance with 30-A MRSA §4353-A, may grant a variance to an owner of a
residential dwelling for the purpose of making that dwelling accessible to a person with a disability who
resides in or regularly uses the dwelling. The board shall restrict any variance granted under this
subsection solely to the installation of equipment or the construction of structures necessary for access
to or egress from the dwelling by the person with the disability. The board may impose conditions on
the variance, including limiting the variance to the duration of the disability or to the time that the
person with the disability lives in the dwelling. The term "structures necessary for access to or egress
from the dwelling" shall include railing, wall or roof systems necessary for the safety or effectiveness
of the structure. Any permit issued pursuant to this subsection is subject to Sections 16(H)(2)(f) and
16(H)(4)(b)(iv) below.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to ensure
conformance with the purposes and provisions of this Ordinance to the greatest extent possible, and in
doing so may impose such conditions to a variance as it deems necessary. The party receiving the
variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information supplied by
the applicant, shall be forwarded by the municipal officials to the Commissioner of the Department of
Environmental Protection at least twenty (20) days prior to action by the Board of Appeals. Any
31
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
comments received from the Commissioner prior to the action by the Board of Appeals shall be made
part of the record and shall be taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of Appeals
shall hold a "de novo" hearing. At this time the Board may receive and consider new evidence and
testimony, be it oral or written. When acting in a "de novo" capacity the Board of Appeals shall hear and
decide the matter afresh, undertaking its own independent analysis of evidence and the law, and reaching
its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate hearing, and
may reverse the decision of the Planning Board only upon finding that the decision was contrary to
specific provisions of the Ordinance or contrary to the facts presented to the Planning Board. The Board
of Appeals may only review the record of the proceedings before the Planning Board. The Board
Appeals shall not receive or consider any evidence which was not presented to the Planning Board, but
the Board of Appeals may receive and consider written or oral arguments. If the Board of Appeals
determines that the record of the Planning Board proceedings are inadequate, the Board of Appeals may
remand the matter to the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party
from any decision of the Code Enforcement Officer or the Planning Board, except for
enforcement-related matters as described in Section 16(H)(1)(a) above. Such an appeal shall be
taken within forty-five (45) days of the date of the official, written decision appealed from, and not
otherwise, except that the Board, upon a showing of good cause, may waive the forty-five (45)
day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written notice of
appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal or
variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and structures and
other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code Enforcement
Officer or Planning Board, as appropriate, shall transmit to the Board of Appeals all of the papers
constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a request for a
variance within forty-five (45) days of its receipt of a complete written application, unless this time
period is extended by the parties.
32
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23™, 2022
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum for the
purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within forty-five (45)
days after the close of the hearing, and shall issue a written decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a statement
of the facts found and conclusions reached by the Board. The Board shall cause written
notice of its decision to be mailed or hand-delivered to the applicant and to the Department of
Environmental Protection within seven (7) days of the Board's decision. Copies of written
decisions of the Board of Appeals shall be given to the Planning Board, Code Enforcement
Officer, and the municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party
who participated as a party during the proceedings before the Board of Appeals may take an appeal to
Superior Court in accordance with State laws within forty-five (45) days from the date of any decision of
the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision. A request to the Board to
reconsider a decision must be filed within ten (10) days of the decision that is being reconsidered. A vote
to reconsider and the action taken on that reconsideration must occur and be completed within forty-five
(45) days of the date of the vote on the original decision. Reconsideration of a decision shall require a
positive vote of the majority of the Board members originally voting on the decision, and proper notification
to the landowner, petitioner, planning board, code enforcement officer, and other parties of interest,
including abuttors and those who testified at the original hearing(s). The Board may conduct additional
hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days after the
decision on reconsideration.
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance. If
the Code Enforcement Officer shall find that any provision of this Ordinance is being violated, he or
she shall notify in writing the person responsible for such violation, indicating the nature of the violation
and ordering the action necessary to correct it, including discontinuance of illegal use of land, buildings
or structures, or work being done, removal of illegal buildings or structures, and abatement of nuisance
33
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23, 2022
conditions. A copy of such notices shall be submitted to the municipal officers and be maintained as a
permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with all
applicable laws and conditions attached to permit approvals. The Code Enforcement Officer shall also
investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of the office,
including applications submitted, permits granted or denied, variances granted or denied, revocation
actions, revocation of permits, appeals, court actions, violations investigated, violations found, and fees
collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon notice from the Code Enforcement Officer, are hereby
directed to institute any and all actions and proceedings, either legal or equitable, including seeking
injunctions of violations and the imposition of fines, that may be appropriate or necessary to enforce the
provisions of this Ordinance in the name of the municipality. The municipal officers, or their authorized
agent, are hereby authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing evidence that the illegal structure or
use was constructed or conducted as a direct result of erroneous advice given by an authorized municipal
official and there is no evidence that the owner acted in bad faith, or unless the removal of the structure or
use will result in a threat or hazard to public health and safety or will result in substantial environmental
damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a contractor, who
violates any provision or requirement of this Ordinance shall be penalized in accordance with 30-A,
M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2,500 per violation for each
day that the violation continues.However, in a resource protection district the maximum penalty is
increased to $5000 (38 M.R.S.A. section 4452).
17. Definitions.
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use or structure.
Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A deck or similar extension of
the principal structure or a garage attached to the principal structure by a roof or a common wall is considered part
of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or denial of a
permit or variance under this Ordinance; a person whose land abuts land for which a permit or variance has been
granted; or any other person or group of persons who have suffered particularized injury as a result of the granting
or denial of such permit or variance.
34
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Agriculture - the production, keeping or maintenance for sale or lease of plants or animals, including, but not limited
to, forages and sod crops, grains and seed crops, dairy animals and dairy products, poultry and poultry products,
livestock, fruits and vegetables,and ornamental green-house products. Agriculture does not include forest
management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of bark. [This
term need to be included as it is used in the text of the ordinance]
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more than 50%
of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft, and which may
include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry-- State of Maine Department of Agriculture, Conservation, and Forestry, Bureau of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living quarters,
including, but not limited to tents, recreational vehicles or other shelters.
Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined below, the
intent and result of which activity is the production of income from the buying and selling of goods and/or
services, exclusive of rental of residential buildings and/or dwelling units.
Development -- a change in land use involving alteration of the land, water or vegetation, or the addition or
alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not limited to
setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental condition caused by
bodily injury, accident, disease, birth defect, environmental conditions or illness; and also includes the physical or
mental condition of a person which constitutes a substantial handicap as determined by a physician or in the case
of mental handicap, by a psychiatrist or psychologist, as well as any other health or sensory impairment which
requires special education, vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-family dwellings
or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such as protection
of resources from immediate destruction or loss, law enforcement, and operations to rescue human beings,
property and livestock from the threat of destruction or injury.
35
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water transmission or
distribution lines, towers and related equipment; telephone cables or lines, poles and related equipment; gas, oil,
water, slurry or other similar pipelines; municipal sewage lines, collection or supply systems; and associated
storage tanks. Such systems may include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms
and police call boxes, traffic signals, hydrants and similar accessories, but shall not include service drops or
buildings which are necessary for the furnishing of such services.
Expansion of a structure - an increase in the footprint or height of a structure, including all extensions such as, but
not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of more footprint of
a structure or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved in order to
discharge the 100-year flood without cumulatively increasing the water surface elevation by more than one foot
in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls
Footprint - the entire area of ground covered by the structure(s) on a lot, including but not limited to cantilevered
or similar overhanging extensions, as well as unenclosed structures, such as patios and decks.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills and post
supports, but including basements, slabs, frostwalls, or other base consisting of concrete, block, brick or similar
material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested wetlands, which
are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a surface
water body, excluding any river, stream or brook, such that in a natural state, the combined surface
area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to
support, and which under normal circumstances do support, a prevalence of wetland vegetation
typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the criteria
of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on submerged
lands or that require direct access to, or location in, inland waters and that can not be located away from these
36
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
waters. The uses include, but are not limited to, commercial and recreational fishing and boating facilities, finfish
and shellfish processing, fish-related storage and retail and wholesale fish marketing facilities, waterfront dock
and port facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels, shoreline
structures necessary for erosion control purposes, industrial uses dependent upon water-borne transportation or
requiring large volumes of cooling or processing water that can not reasonably be located or operated at an
inland site, and uses that primarily provide general public access to inland waters. Recreational boat storage
buildings are not considered to be a functionally water-dependent use.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten acres, and
any inland body of water artificially formed or increased which has a surface area in excess of thirty (30) acres
except for the purposes of this Ordinance, where the artificially formed or increased inland body of water is
completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-A Section 465-
A. This classification includes some, but not all impoundments of rivers that are defined as great ponds.
Ground cover -- small plants, fallen leaves, needles and twigs, and the partially decayed organic matter of the
forest floor.
Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a structural defect
that under the normal range of environmental conditions at the site exhibits a high probability of failure and loss
of a major structural component of the tree in a manner that will strike a target. A normal range of
environmental conditions does not include meteorological anomalies, such as, but not limited to: hurricanes;
hurricane-force winds; tornados; microbursts; or significant ice storm events. Hazard trees also include those
trees that pose a serious and imminent risk to bank stability. A target is the area where personal injury or
property damage could occur if the tree or a portion of the tree fails. Targets include roads, driveways, parking
areas, structures, campsites, and any other developed area where people frequently gather and linger.
Height of a structure - the vertical distance between the mean original (prior to construction) grade at the
downhill side of the structure and the highest point of the structure, excluding chimneys, steeples, antennas, and
similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a residential structure or
property and which is 1) clearly incidental to and compatible with the residential use of the property and
surrounding residential uses; and 2) which employs no more than two (2) persons other than family members
residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes further deviation
from the dimensional standard(s) creating the nonconformity such as, but not limited to, reduction in water body,
tributary stream or wetland setback distance, increase in lot coverage, or increase in height of a structure.
Property changes or structure expansions which either meet the dimensional standard or which cause no further
increase in the linear extent of nonconformance of the existing structure shall not be considered to increase
nonconformity. For example, there is no increase in nonconformity with the setback requirement for water
bodies, wetlands, or tributary streams if the expansion extends no further into the required setback area than
does any portion of the existing nonconforming structure. Hence, a structure may be expanded laterally
provided that the expansion extends no closer to the water body, tributary stream, or wetland than the closest
37
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
portion of the existing structure from that water body, tributary stream, or wetland. Included in this allowance
are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which is developed
for repeated camping by only one group not to exceed ten (10) individuals and which involves site improvements
which may include but not be limited to a gravel pad, parking area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or the
extraction of minerals.
Institutional -- a non-profit or quasi-public use, or institution such as a church, library, public or private school,
hospital, or municipally owned or operated building, structure or land used for public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal high-water
line of a water body or upland edge of a wetland and areas beneath roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use, providing for hire
offshore moorings or docking facilities for boats, and which may also provide accessory services such as boat
and related sales, boat repair and construction, indoor and outdoor storage of boats and marine equipment, bait
and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing market
conditions in a sale between a willing seller and a willing buyer, both conversant with the property and with
prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or extent of mineral
resources which create minimal disturbance to the land and which include reasonable measures to restore the
land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than one hundred
(100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from its natural
location and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot lines extend into
the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling units.
Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure or use which is allowed solely because it was in lawful
existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of this
Ordinance, does not meet the area, frontage, or width requirements of the district in which it is located.
38
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Non-conforming structure - a structure which does not meet any one or more of the following dimensional
requirements; setback, height, lot coverage or footprint, but which is allowed solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not allowed in the
district in which it is situated, but which is allowed to remain solely because it was in lawful existence at the time
this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation - species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine
ecosystems.
Normal high-water line - that line which is apparent from visible markings, changes in the character of soils due
to prolonged action of the water or changes in vegetation, and which distinguishes between predominantly
aquatic and predominantly terrestrial land. Areas contiguous with rivers and great ponds that support non-
forested wetland vegetation and hydric soils and that are at the same or lower elevation as the water level of the
river or great pond during the period of normal high-water are considered part of the river or great pond.
Outlet stream - any perennial or intermittent stream, as shown on the most recent highest resolution version of
the national hydrography dataset available from the United States Geological Survey on the website of the
United States Geological Survey or the national map, that flows from a freshwater wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership, association, two
or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the normal high-water
line or within a wetland.
Temporary: Structures which remain in or over the water for less than seven (7) months in any period of
twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or more in any period of
twelve (12) consecutive months.
Principal structure - a structure other than one which is used for purposes wholly incidental or accessory to the
use of another structure or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another use on the same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and roads, which
are owned, leased, or otherwise operated, or funded by a governmental body or public entity.
Recent floodplain soils - the following soil series as described and identified by the National Cooperative Soil
Survey:
Fryeburg Hadley Limerick
39
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Lovewell Medomak Ondawa
Alluvial Cornish Charles
Podunk Rumney Saco
Suncook Sunday Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities, and other
customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for temporary
sleeping or living quarters for one or more persons, and which may include a pick-up camper, travel trailer, tent
trailer, camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit must
remain with its tires on the ground, and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either malfunctioning or
being upgraded with no significant change of design flow or use of the structure, or 2.) any existing overboard
wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as permanent,
seasonal, or temporary living quarters for only one family at a time, and containing cooking, sleeping and toilet
facilities. The term shall include mobile homes and rental units that contain cooking, sleeping, and toilet facilities
regardless of the time-period rented. Recreational vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and soil
stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point at which it
provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing material
constructed for or created by the repeated passage of motorized vehicles, excluding a driveway as defined.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet above ground
level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above ground level.
Service drop - any utility line extension which does not cross or run beneath any portion of a water body
provided that:
1. inthe case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon the premises of the
customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
40
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
a. the extension, regardless of length, will be made by the installation of telephone wires to existing utility
poles, or
b. the extension requiring the installation of new utility poles or placement underground is less than one
thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary stream, or
upland edge of a wetland, to the nearest part of a structure, road, parking space or other regulated object or
area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line between the
intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within five hundred (500) feet, horizontal distance, of the normal high-
water line of Ellis (Roxbury) Pond, and two hundred and fifty (250) feet, horizontal distance, of the normal high-
water line of other great ponds or river; within seventy-five (75) feet of a stream.
Shoreline -- the normal] high-water line, or upland edge of a freshwater wetland.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or that remains standing
and is damaged beyond the point of recovery as the result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2) perennial
streams as depicted on the most recent, highest resolution version of the national hydrogaphy dataset available
from the United States Geological Survey on the website of the United States Geological Survey or the national
map or as depicted on the Official Shoreland Zoning Map, to the point where the stream becomes a river or
where the stream meets the shoreland zone of another water body or wetland. When a stream meets the
shoreland zone of a water body or wetland and a channel forms downstream of the water body or wetland as an
outlet, that channel is also a stream.
Structure -- anything temporarily or permanently located, built, constructed or erected for the support, shelter or
enclosure of persons, animals, goods or property of any kind or anything constructed or erected on or in the
ground. The term includes structures temporarily or permanently located, such as decks, patios, and satellite
dishes. Structure does not include fences; poles and wiring and other aerial equipment normally associated with
service drops, including guy wires and guy anchors; subsurface waste water disposal systems as defined in Title
30-A, section 4201, subsection 5; geothermal heat exchange wells as defined in Title 32, section 4700-E,
subsection 3-C; or wells or water wells as defined in Title 32, section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a percentage of
estimated total cost.
Subsurface sewage disposal system -- any system designed to dispose of waste or waste water on or beneath
the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools;
holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used for those purposes;
does not include any discharge system licensed under 38 M.R.S.A. section 414, any surface waste water
disposal system, or any municipal or quasi-municipal sewer or waste water treatment system..
41
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Sustained slope - a change in elevation where the referenced percent grade is substantially maintained or
exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or processing forest
products. "Timber harvesting" does not include the cutting or removal of vegetation within the shoreland zone
when associated with any other land use activities. The cutting or removal of trees in the shoreland zone on a lot
that has less than two (2) acres within the shoreland zone shall not be considered timber harvesting. Such
cutting or removal of trees shall be regulated pursuant to Section 15 (P), Clearing or Removal of Vegetation
for Activities Other Than Timber Harvesting.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four and one
half (4.5) feet above the ground, with a more or less definite crown, and reaching a height of at least ten (10)
feet at maturity.
Tributary stream -- means a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing
waterborne deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with
other water bodies. "Tributary stream' does not include rills or gullies forming because of accelerated erosion in
disturbed soils where the natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies to that
portion of the tributary stream located within the shoreland zone of the receiving water body or wetland.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a freshwater wetland,
the upland edge is formed where the soils are not saturated for a duration sufficient to support wetland
vegetation; or where the soils support the growth of wetland vegetation, but such vegetation is dominated by
woody stems that are six (6) meters (approximately twenty (20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over and under 4 inches
in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream, tributary stream,
or wetland whether under, through, or over the water or wetland. Such projects include but may not be limited
to roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these
crossings. This definition includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
42
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022
Given under our hands this 2 wday of Sly, aoae Se {0
TIMOTHY _ DEROUCHE
7?
Z HEW PATNEAUDE
| RAY HODSDON
BOARD OF SELECTMEN
TOWN OF ROXBURY
A TRUE COPY
Attest:
BRITTANY ON, Town Clerk
Ordinance Adopted: March 7", 2011
Ordinance Amended: June 23", 2022 [Article 4]
Town of Roxbury, Maine 04275
43
Town of Roxbury Shoreland Zoning Ordinance
Amended June 23", 2022