This is the exact embedded text of the captured official document.
Snapshot 09ffe8f40063 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
1
1
SHORELAND
ZONING
ORDINANCE
FOR THE
MUNICIPALITY OF
SABATTUS
2009 Revised
ADOPTED MAY 30, 2009
2
2
TABLE OF CONTENTS
Page
1. Purposes.................................................................................................................................................4
2. Authority ...............................................................................................................................................4
3. Applicability..........................................................................................................................................4
4. Effective Date ........................................................................................................................................4
A. Effective Date of Ordinance and Ordinance Amendments..........................................................4
B. Sections 15(O) and 15(O-1) .............................................................................................................5
5. Availability ............................................................................................................................................5
6. Severability............................................................................................................................................5
7. Conflicts with Other Ordinances.........................................................................................................5
8. Amendments..........................................................................................................................................5
9. Districts and Zoning Map ....................................................................................................................5
A. Official Shoreland Zoning Map ....................................................................................................5
B. Scale of Map....................................................................................................................................6
C. Certification of Official Shoreland Zoning Map .........................................................................6
D. Changes to the Official Shoreland Zoning Map..........................................................................6
10. Interpretation of District Boundaries .................................................................................................6
11. Land Use Requirements.......................................................................................................................6
12. Non-conformance..................................................................................................................................6
A. Purpose............................................................................................................................................6
B. General............................................................................................................................................7
C. Non-conforming Structures...........................................................................................................7
D. Non-conforming Uses...................................................................................................................10
E. Non-conforming Lots...................................................................................................................10
13. Establishment of Districts ..................................................................................................................11
A. Resource Protection District .......................................................................................................11
B. Limited Residential District ........................................................................................................12
C. General Development District.....................................................................................................12
D. Stream Protection District...........................................................................................................13
14. Table of Land Uses .............................................................................................................................13
15. Land Use Standards .........................................................................................................................16
A. Minimum Lot Standards .............................................................................................................16
B. Principal and Accessory Structures............................................................................................17
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Beyond the Normal High-Water Line of a Water body or Within a Wetland .......................20
D. Campgrounds ...............................................................................................................................21
E. Individual Private Campsites .....................................................................................................21
3
3
F. Commercial and Industrial Uses.......................................................................................................22
G. Parking Areas...............................................................................................................................23
H. Roads and Driveways ..................................................................................................................24
I. Signs...............................................................................................................................................26
J. Storm Water Runoff ..................................................................................................................27
K. Septic Waste Disposal ......................................................................................27
L. Essential Services ........................................................................................................................27
M. Mineral Exploration and Extraction .........................................................................................28
N. Agriculture....................................................................................................................................29
O. Timber Harvesting ......................................................................................................................30
O-1 Timber Harvesting - Statewide Standards................................................................................32
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ...............43
Q. Erosion and Sedimentation Control ..........................................................................................46
R. Soils................................................................................................................................................47
S. Water Quality...............................................................................................................................47
T. Archaeological Site ......................................................................................................................47
16. Administration....................................................................................................................................49
A. Administering Bodies and Agents ..............................................................................................49
B. Permits Required .........................................................................................................................49
C. Permit Application.......................................................................................................................50
D. Procedure for Administering Permits ......................................................................................50
E. Special Exceptions........................................................................................................................52
F. Expiration of Permit ....................................................................................................................53
G. Installation of Public Utility Service ..........................................................................................53
H. Appeals..........................................................................................................................................54
J. Enforcement..................................................................................................................................59
17. Definitions ...........................................................................................................................................61
4
4
Shoreland Zoning Ordinance for the Municipality of Sabattus
1. Purposes. The purposes of this Ordinance are to further the maintenance of
safe and healthful conditions; to prevent and control water pollution; to
protect fish spawning grounds, aquatic life, bird and other wildlife
habitat; to protect buildings and lands from flooding and accelerated
erosion; to protect archaeological and historic resources; to protect
freshwater wetlands; to control building sites, placement of structures
and land uses; to conserve shore cover, and visual as well as actual
points of access to inland waters; to conserve natural beauty and open
space; and to anticipate and respond to the impacts of development in
shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the
provisions of Title 38 sections 435-449 of the Maine Revised Statutes
Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas:
- Within 250, horizontal distance, of the normal high-water line of the
Sabattus River, or the 100 year floodplain, which ever is greater or
- Within 250 feet, horizontal distance, of the normal high water line of
Curtis Brook, Maxwell Brook, Fisher Brook and Barker Brook or
- Within 250 feet, horizontal distance, of the upland edge of a
freshwater wetland,
- Within 250, horizontal distance, of the normal high-water line of any
great pond.
And all land areas within 75 feet, horizontal distance, of the normal
high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a
dock, wharf or pier, or other structure extending or located below the
normal high-water line of a water body or within a wetland.
4. Effective Date
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
adopted by the municipal legislative body on MAY 30, 2009, shall not be
effective unless approved by the Commissioner of the Department of
Environmental Protection. A certified copy of the Ordinance, or
Ordinance Amendment, attested and signed by the Municipal Clerk, shall be
forwarded to the Commissioner for approval. If the Commissioner fails to
act on this Ordinance or Ordinance Amendment, within forty-five (45) days
of his/her receipt of the Ordinance, or Ordinance Amendment, it shall be
automatically approved.
5
5
Any application for a permit submitted to the municipality within the
forty-five (45) day period shall be governed by the terms of this
Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance
Amendment, is approved by the Commissioner.
B. Sections 15(O) and 15(O-1). Section 15(O) is repealed on the statutory date
established under 38 M.R.S.A. section 438-B (5), at which time Section
15(O-1) shall become effective. Until such time as Section 15(O) is
repealed, Section 15(O-1) is not in effect.
5. Availability. A certified copy of this Ordinance shall be filed with the
Municipal Clerk and shall be accessible to any member of the public.
Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this
Ordinance shall be posted.
6. Severability. Should any section or provision of this Ordinance be declared by
the courts to be invalid, such decision shall not invalidate any other
section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts
with or is inconsistent with another provision of this Ordinance or of
any
other
ordinance,
regulation
or
statute
administered
by
the
municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the
legislative body. Copies of amendments, attested and signed by the
Municipal Clerk, shall be submitted to the Commissioner of the Department
of
Environmental
Protection
following
adoption
by
the
municipal
legislative body and shall not be effective unless approved by the
Commissioner. If the Commissioner fails to act on any amendment within
forty-five (45) days of his/her receipt of the amendment, the amendment
is automatically approved. Any application for a permit submitted to the
municipality within the forty-five (45) day period shall be governed by
the terms of the amendment, if such amendment is approved by the
Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable
are hereby divided into the following districts as shown on the
Official Shoreland Zoning Map(s) which is (are) made a part of this
Ordinance:
(1) Resource Protection
(2) Limited Residential
6
6
(3) General Development
(4) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale
of not less than: 1 inch = 2000 feet. District boundaries shall be
clearly delineated and a legend indicating the symbols for each
district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map
shall be certified by the attested signature of the Municipal Clerk and
shall be located in the municipal office. In the event the municipality
does not have a municipal office, the Municipal Clerk shall be the
custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with
Section 8, are made in the district boundaries or other matter
portrayed on the Official Shoreland Zoning Map, such changes shall be
made on the Official Shoreland Zoning Map within thirty (30) days after
the amendment has been approved by the Commissioner of the Department
of Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official
Shoreland Zoning Map, district boundary lines are property lines, the
centerlines of streets, roads and rights of way, and the boundaries of
the shoreland area as defined herein. Where uncertainty exists as to the
exact location of district boundary lines, the Board of Appeals shall be
the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building,
structure or land shall hereafter be used or occupied, and no building or
structure or part thereof shall hereafter be erected, constructed,
expanded, moved, or altered and no new lot shall be created except in
conformity with all of the regulations herein specified for the district
in which it is located, unless a variance is granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use
conformities, except that non-conforming conditions that existed before
the effective date of this Ordinance or amendments thereto shall be
allowed to continue, subject to the requirements set forth in Section
12. Except as otherwise provided in this Ordinance, a non-conforming
condition shall not be permitted to become more non-conforming.
7
7
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses
may be transferred, and the new owner may continue the non-
conforming use or continue to use the non-conforming structure or
lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit,
the normal upkeep and maintenance of non-conforming uses and
structures including repairs or renovations that do not involve
expansion of the non-conforming use or structure, and such other
changes in a non-conforming use or structure as federal, state, or
local building and safety codes may require.
.
C. Non-conforming Structures
(1) Expansions. A non-conforming structure may be added to or expanded
after obtaining a permit from the same permitting authority as that
for a new structure, if such addition or expansion does not increase
the non-conformity of the structure and is in accordance with
subparagraphs (a) and (b) below.
(a) After January 1, 1989 if any portion of a structure is less than
the required setback from the normal high-water line of a water
body or tributary stream or the upland edge of a wetland, that
portion of the structure shall not be expanded, as measured in
floor area or volume, by 30% or more, during the lifetime of the
structure. If a replacement structure conforms with the
requirements of Section 12(C)(3), and is less than the required
setback from a water body, tributary stream or wetland, the
replacement structure may not be expanded if the original
structure existing on January 1, 1989 had been expanded by 30% in
floor area and volume since that date.
(b) Whenever a new, enlarged, or replacement foundation is constructed
under a non-conforming structure, the structure and new foundation
must be placed such that the setback requirement is met to the
greatest practical extent as determined by the Planning Board or
its designee, basing its decision on the criteria specified in
Section 12(C) (2) Relocation, below. If the completed foundation
does not extend beyond the exterior dimensions of the structure,
except for expansion in conformity with Section 12(C) (1) (a)
above, and the foundation does not cause the structure to be
elevated by more than three (3) additional feet, as measured from
the uphill side of the structure (from original ground level to
the bottom of the first floor sill), it shall not be considered to
8
8
be an expansion of the structure.
(2) Relocation. A non-conforming structure may be relocated within the
boundaries of the parcel on which the structure is located provided
that the site of relocation conforms to all setback requirements to
the greatest practical extent as determined by the Planning Board or
its designee, and provided that the applicant demonstrates that the
present subsurface sewage disposal system meets the requirements of
State law and the State of Maine Subsurface Wastewater Disposal
Rules (Rules), or that a new system can be installed in compliance
with the law and said Rules. In no case shall a structure be
relocated in a manner that causes the structure to be more non-
conforming.
In determining whether the building relocation meets the setback to
the greatest practical extent, the Planning Board or its designee
shall consider the size of the lot, the slope of the land, the
potential for soil erosion, the location of other structures on the
property and on adjacent properties, the location of the septic
system and other on-site soils suitable for septic systems, and the
type and amount of vegetation to be removed to accomplish the
relocation. When it is necessary to remove vegetation within the
water or wetland setback area in order to relocate a structure, the
Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation. In addition, the area from
which the relocated structure was removed must be replanted with
vegetation. Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted
with at least one native tree, three (3) feet in height, for every
tree removed. If more than five trees are planted, no one species
of tree shall make up more than 50% of the number of trees
planted. Replaced trees must be planted no further from the water
or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are
removed or destroyed in order to relocate a structure must be re-
established. An area at least the same size as the area where
vegetation and/or ground cover was disturbed, damaged, or removed
must be reestablished within the setback area. The vegetation
and/or ground cover must consist of similar native vegetation
and/or ground cover that was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the
original location of the structure shall be replanted with
vegetation which may consist of grasses, shrubs, trees, or a
combination thereof.
9
9
(3) Reconstruction or Replacement. Any non-conforming structure which is
located less than the required setback from a water body, tributary
stream, or wetland and which is removed, or damaged or destroyed,
regardless of the cause, by more than 50% of the market value of the
structure
before
such
damage,
destruction
or
removal,
may
be
reconstructed or replaced provided that a permit is obtained within
eighteen (18) months of the date of said damage, destruction, or
removal, and provided that such reconstruction or replacement is in
compliance with the water body, tributary stream or wetland setback
requirement to the greatest practical extent as determined by the
Planning Board or its designee in accordance with the purposes of this
Ordinance. In no case shall a structure be reconstructed or replaced
so as to increase its non-conformity. If the reconstructed or
replacement structure is less than the required setback it shall not
be any larger than the original structure, except as allowed pursuant
to Section 12(C)(1) above, as determined by the non-conforming floor
area and volume of the reconstructed or replaced structure at its new
location. If the total amount of floor area and volume of the
original structure can be relocated or reconstructed beyond the
required setback area, no portion of the relocated or reconstructed
structure shall be replaced or constructed at less than the setback
requirement for a new structure. When it is necessary to remove
vegetation in order to replace or reconstruct a structure, vegetation
shall be replanted in accordance with Section 12(C) (2) above.
Any non-conforming structure which is located less than the required
setback from a water body, tributary stream, or wetland and which is
removed by 50% or less of the market value, or damaged or destroyed by
50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is
obtained from the Code Enforcement Officer within one year of such
damage, destruction, or removal.
In determining whether the building reconstruction or replacement
meets the setback to the greatest practical extent the Planning Board
or its designee shall consider, in addition to the criteria in Section
12(C)(2) above, the physical condition and type of foundation present,
if any.
(4) Change of Use of a Non-conforming Structure. The use of a non-
conforming structure may not be changed to another use unless the
Planning Board, after receiving a written application, determines that
the new use will have no greater adverse impact on the water body,
tributary stream, or wetland, or on the subject or adjacent properties
and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning
Board
shall
require
written
documentation
from
the
applicant,
regarding the probable effects on public health and safety, erosion
10
10
and
sedimentation,
water
quality,
fish
and
wildlife
habitat,
vegetative cover, visual and actual points of public access to waters,
natural beauty, floodplain management, archaeological and historic
resources, and functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited,
except that non-conforming residential uses may, after obtaining a
permit from the Planning Board, be expanded within existing
residential structures or within expansions of such structures as
allowed in Section 12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on which
a non-conforming use is discontinued for a period exceeding one
year, or which is superseded by a conforming use, may not again be
devoted to a non-conforming use except that the Planning Board may,
for good cause shown by the applicant, grant up to a one year
extension to that time period. This provision shall not apply to
the resumption of a use of a residential structure provided that the
structure has been used or maintained for residential purposes
during the preceding five (5) year period.
(3) Change of Use. An existing non-conforming use may be changed to
another non-conforming use provided that the proposed use has no
greater adverse impact on the subject and adjacent properties and
resources than the former use, as determined by the Planning Board.
The determination of no greater adverse impact shall be made
according to criteria listed in Section 12(C)(4) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the
effective date of this Ordinance or amendment thereto may be built
upon, without the need for a variance, provided that such lot is in
separate ownership and not contiguous with any other lot in the same
ownership, and that all provisions of this Ordinance except lot
area, lot width and shore frontage can be met. Variances relating
to setback or other requirements not involving lot area, lot width
or shore frontage shall be obtained by action of the Board of
Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are
in a single or joint ownership of record at the time of adoption of
this Ordinance, if all or part of the lots do not meet the
dimensional requirements of this Ordinance, and if a principal use
or structure exists on each lot, the non-conforming lots may be
conveyed separately or together, provided that the State Minimum Lot
11
11
Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the State
of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot
of record on the effective date of this ordinance, each may be sold
on a separate lot provided that the above referenced law and rules
are complied with. When such lots are divided each lot thus created
must be as conforming as possible to the dimensional requirements of
this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more
contiguous lots or parcels are in single or joint ownership of
record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments,
and if one or more of the lots are vacant or contain no principal
structure the lots shall be combined to the extent necessary to meet
the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at
least one of which is non-conforming, owned by the same person or
persons on June 20, 1992 and recorded in the registry of deeds if
the lot is served by a public sewer or can accommodate a subsurface
sewage disposal system in conformance with the State of Maine
Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least
20,000 square feet of lot area; or
(b) Any lots that do not meet the frontage and lot size requirements
of Section 12(E)(3)(a) are reconfigured or combined so that each
new lot contains at least 100 feet of shore frontage and 20,000
square feet of lot area.
13. Establishment of Districts
.
A. Resource Protection District. The Resource Protection District includes areas in
which development would adversely affect water quality, productive
habitat, biological ecosystems, or scenic and natural values. This
district shall include the following areas when they occur within the
limits of the shoreland zone, exclusive of the Stream Protection
District, except that areas which are currently developed and areas
which meet the criteria for General Development I District need not be
included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of
freshwater wetlands and wetlands associated with great ponds and
rivers, which are rated "moderate" or "high" value waterfowl and
12
12
wading bird habitat, including nesting and feeding areas, by the
Maine Department of Inland Fisheries and Wildlife (MDIF&W) that are
depicted on a Geographic Information System (GIS) data layer
maintained by either MDIF&W or the Department as of October 1, 2008.
For the purposes of this paragraph "wetlands associated with great
ponds and rivers" shall mean areas characterized by non-forested
wetland vegetation and hydric soils that are contiguous with a great
pond or river, and have a surface elevation at or below the water
level of the great pond or river during the period of normal high
water. "Wetlands associated with great ponds or rivers" are
considered to be part of that great pond or river.
(2) Floodplains along rivers and floodplains along artificially formed
great ponds along rivers, defined by the 100 year floodplain as
designated on the Federal Emergency Management Agency's (FEMA) Flood
Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of
record, or in the absence of these, by soil types identified as
recent floodplain soils.
(3) Within 250 feet, horizontal distance, of the normal high-water line
of Curtis Brook, Maxwell Brook, and Fisher Brook.
(4) Areas of two or more contiguous acres with sustained slopes of 20%
or greater.
(5) Areas of two (2) or more contiguous acres supporting wetland
vegetation and hydric soils, which are not part of a freshwater
wetland as defined, and which are not surficially connected to a
water body during the period of normal high water.
(6) Land
areas
along
rivers
subject
to
severe
bank
erosion,
undercutting, or river bed movement.
B. Limited Residential District. The Limited Residential District includes those
areas suitable for residential and recreational development. It
includes areas other than those in the Resource Protection District, or
Stream Protection District, and areas which are used less intensively
than those in the General Development District.
C.
.
General Development District. The General Development District includes the
following types of existing, intensively developed areas:
13
13
(1) Areas of two or more contiguous acres devoted to commercial,
industrial or intensive recreational activities, or a mix of such
activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other industrial
activities;
(b) Areas devoted to wholesaling, warehousing, retail trade and
service activities, or other commercial activities; and
(c) Areas
devoted
to
intensive
recreational
development
and
activities, such as, but not limited to amusement parks, race
tracks and fairgrounds.
(2) Areas
otherwise
discernible
as
having
patterns
of
intensive
commercial, industrial or recreational uses.
E Stream Protection District. The Stream Protection District includes all land
areas within seventy-five (75) feet, horizontal distance, of the normal
high-water line of a stream, exclusive of those areas within two-
hundred and fifty (250) feet, horizontal distance, of the normal high-
water line of a great pond, or river, or within two hundred and fifty
(250) feet, horizontal distance, of the upland edge of a wetland.
Where a stream and its associated shoreland area are located within
two-hundred and fifty (250) feet, horizontal distance, of the above
water bodies or wetlands, that land area shall be regulated under the
terms of the shoreland district associated with that water body or
wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land
Uses in the Shoreland Zone, shall conform to all of the applicable land
use standards in Section 15. The district designation for a particular
site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land use standards)
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
14
14
Abbreviations:
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -
Resource Protection
GD - General Development
LR - Limited Residential
SP -
Stream Protection
15
15
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
LR
LC
GD
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking
yes
yes
yes
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
yes
3. Forest management activities except for timber harvesting &
land
management roads
yes
yes
yes
yes
yes
4. Timber harvesting
yes
CEO
yes
yes
yes
5.Clearing or removal of vegetation for activities other than timber
harvesting
CE
CEO
yes
yes
yes
6. Fire prevention activities
yes
yes
yes
yes
yes
7. Wildlife management practices
yes
yes
yes
yes
yes
8. Soil and water conservation practices
yes
yes
yes
yes
yes
9. Mineral exploration
no
yes2
yes2
yes2
yes2
10. Mineral extraction including sand and gravel extraction
no
PB3
PB
PB
PB
11. Surveying and resource analysis
yes
yes
yes
yes
yes
12. Emergency operations
yes
yes
yes
yes
yes
13. Agriculture
yes
PB
yes
yes
yes
14. Aquaculture
PB
PB
PB
yes
yes
15. Principal structures and uses
A. One and two family residential, including driveways
PB4
PB9
CEO
CEO
CEO
B. Multi-unit residential
no
no
PB
PB
PB
C. Commercial
no
no10
no10
PB
PB
D. Industrial
no
no
no
no
PB
E. Governmental and institutional
no
no
PB
PB
PB
F. Small non-residential facilities for educational, scientific, or
nature
interpretation purposes
PB4
PB
CEO
CEO
CEO
16. Structures accessory to allowed uses
PB4
PB
CEO
CEO
yes
17. Piers, docks, wharfs, bridges and other structures and
uses extending over or below the normal high-water line
or within a wetland
a. Temporary
b. Permanent
CEO1
1
PB
CEO1
1
PB
CEO
11
PB
CEO1
1
PB
CEO
11
PB
18. Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
LPI
LPI
19. Home occupations
PB
PB
PB
CEO
yes
20. Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
LPI
21. Essential services
PB6
PB6
PB
PB
PB
A. Roadside distribution lines (34.5kV and lower)
CEO6
CEO6
yes12
yes12
yes12
B. Non-roadside or cross-country distribution lines involving
ten poles or less in the shoreland zone
PB6
PB6
CEO
CEO
CEO
C. Non-roadside or cross-country distribution lines involving
eleven or more poles in the shoreland zone
PB6
PB6
PB
PB
PB
D. Other essential services
PB6
PB6
PB
PB
PB
22. Service drops, as defined, to allowed uses
yes
yes
yes
yes
yes
23. Public and private recreational areas involving minimal
structural development
PB
PB
PB
CEO
CEO
24. Individual, private campsites
CEO
CEO
CEO
CEO
CEO
25. Campgrounds
no
no7
PB
PB
PB
26. Road construction
PB
no8
PB
PB
PB
27. Land management roads
yes
PB
yes
yes
yes
28. Parking facilities
no
no7
PB
PB
PB
16
16
29. Marinas
PB
no
PB
PB
PB
30. Filling and earth moving of <10 cubic yards
CEO
CEO
yes
yes
yes
31. Filling and earth moving of >10 cubic yards
PB
PB
CEO
CEO
CEO
32. Signs
yes
yes
yes
yes
yes
33. Uses similar to allowed uses
CEO
CEO
CEO
CEO
CEO
34. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
CEO
35. Uses similar to uses requiring a PB permit
PB
PB
PB
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great
ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface
area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
6See further restrictions in Section 15(L) (2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a
permit is required from the PB.
8Except as provided in Section 15(H) (3).
9Single family residential structures may be allowed by special exception only according to the
provisions of Section 16(E), Special Exceptions. Two-family residential structures are
prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds,
that are allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit is
required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
A person performing any of the following activities shall require a permit from the
Department of Environmental Protection, pursuant to 38 M.R.S.A. section 480-C, if the
activity occurs in, on, over or adjacent to any freshwater wetland, great pond, river, stream
or brook and operates in such a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall conform to the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit
40,000
200
(b) Governmental, Institutional, Commercial
17
17
Or Industrial per principal structure
60,000
300
(c) Public and Private Recreational Facilities 40,000
200
(2) Land below the normal high-water line of a water body or upland edge of a wetland
and land beneath roads serving more than two (2) lots shall not be included toward
calculating minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land
on both sides thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland
shall be equal to or greater than the shore frontage requirement for a lot with the
proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each
additional dwelling unit, principal structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set
back at least one hundred (100) feet, horizontal distance,
from the normal high-water line of great ponds classified GPA
and rivers that flow to great ponds classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or
the upland edge of a wetland, except that in the General
Development District the setback from the normal high-water
line shall be at least twenty five (25) feet, horizontal
distance. In the Resource Protection District the setback
requirement shall be 250 feet, horizontal distance, except for
structures, roads, parking spaces or other regulated objects
specifically allowed in that district in which case the
setback requirements specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback
provision shall neither apply to structures which require
direct access to the water body or wetland as an
18
18
operational necessity, such as piers, docks and retaining
walls, nor to other functionally water-dependent uses.
(b) On a non-conforming lot of record on which only a
residential structure exists, and it is not possible to
place an accessory structure meeting the required water
body, tributary stream or wetland setbacks, the code
enforcement officer may issue a permit to place a single
accessory structure, with no utilities, for the storage of
yard tools and similar equipment. Such accessory structure
shall not exceed eighty (80) square feet in area nor eight
(8) feet in height, and shall be located as far from the
shoreline or tributary stream as practical and shall meet
all other applicable standards, including lot coverage and
vegetation clearing limitations. In no case shall the
structure be located closer to the shoreline or tributary
stream than the principal structure.
(2) Principal or accessory structures and expansions of existing
structures which are permitted in the Resource Protection,
Limited Residential, Limited Commercial, and Stream Protection
Districts, shall not exceed thirty-five (35) feet in height.
This provision shall not apply to structures such as
transmission
towers,
windmills,
antennas,
and
similar
structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and
structures, including basements, shall be elevated at least
one foot above the elevation of the 100 year flood, the flood
of record, or in the absence of these, the flood as defined by
soil types identified as recent flood-plain soils. In those
municipalities
that
participate
in
the
National
Flood
Insurance Program and have adopted the April 2005 version, or
later
version,
of
the
Floodplain
Management
Ordinance,
accessory structures may be placed in accordance with the
standards of that ordinance and need not meet the elevation
requirements of this paragraph.
(4) The total footprint area of all structures, parking lots and
other non-vegetated surfaces, within the shoreland zone shall
not exceed twenty (20) percent of the lot or a portion
thereof, located within the shoreland zone, including land
area previously developed, except in the General Development
District adjacent to rivers that do not flow to great ponds
classified GPA, where lot coverage shall not exceed seventy
(70) percent.
19
19
(5) Retaining walls that are not necessary for erosion control
shall meet the structure setback requirement, except for low
retaining walls and associated fill provided all of the
following conditions are met:
(a) The site has been previously altered and an effective
vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance,
from the normal high-water line of a water body, tributary
stream, or upland edge of a wetland;
(b) The site where the retaining wall will be constructed is
legally existing lawn or is a site eroding from lack of
naturally occurring vegetation, and which cannot be
stabilized with vegetative plantings;
(c) The total height of the wall(s), in the aggregate, are no
more than 24 inches;
(e) Retaining walls are located outside of the 100-year
floodplain on rivers, streams, wetlands, and tributary
streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard
Boundary Maps, or the flood of record, or in the absence
of these, by soil types identified as recent flood plain
soils.
(f) The area behind the wall is revegitated with grass,
shrubs, trees, or a combination thereof, and no further
structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet,
horizontal distance, of the normal high-water line of a
water body, tributary stream, or upland edge of a wetland
when a natural buffer area does not exist. The buffer
area must meet the following characteristics:
(i) The buffer must include shrubs and other woody and
herbaceous vegetation. Where natural ground cover is
lacking the area must be supplemented with leaf or bark
mulch;
20
20
(ii) Vegetation plantings must be in quantities sufficient
to
retard
erosion
and
provide
for
effective
infiltration of stormwater runoff;
(iii)Only native species may be used to establish the buffer
area;
(iv) A minimum buffer width of 15 feet, horizontal distance,
is required, measured perpendicularly to the normal
high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section
15(P)(2)(a), may traverse the buffer;
(6) Notwithstanding the requirements stated above, stairways or
similar structures may be allowed with a permit from the Code
Enforcement Officer, to provide shoreline access in areas of
steep slopes or unstable soils provided: that the structure is
limited to a maximum of four (4) feet in width; that the
structure does not extend below or over the normal high-water
line of a water body or upland edge of a wetland, (unless
permitted by the Department of Environmental Protection
pursuant to the Natural Resources Protection Act, 38 M.R.S.A.
section 480-C); and that the applicant demonstrates that no
reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within a Wetland.
(1) Access from shore shall be developed on soils appropriate for
such use and constructed so as to control erosion.
(2) The location shall not interfere with existing developed or
natural beach areas.
(3) The facility shall be located so as to minimize adverse
effects on fisheries.
(4) The facility shall be no larger in dimension than necessary to
carry on the activity and be consistent with the surrounding
character and uses of the area. A temporary pier, dock or
wharf shall not be wider than six feet for non-commercial
uses.
(5) No new structure shall be built on, over or abutting a pier,
wharf, dock or other structure extending beyond the normal
21
21
high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland
as an operational necessity.
(6) New permanent piers and docks shall not be permitted unless it
is clearly demonstrated to the Planning Board that a temporary
pier or dock is not feasible, and a permit has been obtained
from the Department of Environmental Protection, pursuant to
the Natural Resources Protection Act.
(7) No existing structures built on, over or abutting a pier,
dock, wharf or other structure extending beyond the normal
high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any district.
(8) Except in the General Development Districts, structures built
on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or
within a wetland shall not exceed twenty (20) feet in height
above the pier, wharf, dock or other structure.
D. Campgrounds.
Campgrounds
shall
conform
to
the
minimum
requirements imposed under State licensing procedures and the
following:
(1) Campgrounds shall contain a minimum of five thousand (5,000)
square feet of land, not including roads and driveways, for
each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be
included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle,
tent or shelter, and utility and service buildings shall be
set back a minimum of one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified
GPA, and seventy-five (75) feet, horizontal distance, from
the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not
associated with campgrounds are allowed provided the following
conditions are met:
(1) One campsite per lot existing on the effective date of this
Ordinance, or thirty thousand (30,000) square feet of lot
area within the shoreland zone, whichever is less, may be
permitted.
22
22
(2) Campsite placement on any lot, including the area intended
for a recreational vehicle or tent platform, shall be set
back one hundred (100) feet, horizontal distance, from the
normal high-water line of a great pond classified GPA or
river flowing to a great pond classified GPA, and seventy-
five (75) feet, horizontal distance, from the normal high-
water line of other water bodies, tributary streams, or the
upland edge of a wetland.
(3) Only one recreational vehicle shall be allowed on a campsite.
The recreational vehicle shall not be located on any type of
permanent foundation except for a gravel pad, and no
structure
except
a
canopy
shall
be
attached
to
the
recreational vehicle.
(4) The
clearing
of
vegetation
for
the
sitting
of
the
recreational vehicle, tent or similar shelter in a Resource
Protection District shall be limited to one thousand (1000)
square feet.
(5) A written sewage disposal plan describing the proposed method
and location of sewage disposal shall be required for each
campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization
from the receiving facility or land owner is required.
(6) When a recreational vehicle, tent or similar shelter is
placed on-site for more than one hundred and twenty (120)
days per year, all requirements for residential structures
shall be met, including the installation of a subsurface
sewage disposal system in compliance with the State of Maine
Subsurface Wastewater Disposal Rules unless served by public
sewage facilities.
F. Commercial and Industrial Uses. The following new commercial and
industrial uses are prohibited within the shoreland zone
adjacent to great ponds classified GPA, and rivers and streams
which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations,
including body shops
(3) Chemical and bacteriological laboratories
23
23
(4) Storage of chemicals, including herbicides, pesticides or
fertilizers, other than amounts normally associated with
individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except
storage on same property as use occurs and except for storage
and sales associated with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream
setback requirements for structures for the district in which
such areas are located. The setback requirement for parking
areas serving public boat launching facilities in Districts
other than the General Development I District shall be no
less than fifty (50) feet, horizontal distance, from the
shoreline or tributary stream if the Planning Board finds
that no other reasonable alternative exists further from the
shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use
and shall be designed to prevent stormwater runoff from
flowing directly into a water body, tributary stream or
wetland and where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking
facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and
twenty (20) feet long, except that parking spaces for a
vehicle and boat trailer shall be forty (40) feet long.
24
24
(b) Internal travel aisles: Approximately twenty (20) feet
wide.
H. Roads and Driveways.
The following standards shall apply to the construction of
roads and/or driveways and drainage systems, culverts and other
related features.
(1) Roads and driveways shall be set back at least one-hundred
(100) feet, horizontal distance, from the normal high-water
line of a great pond classified GPA or a river that flows to a
great pond classified GPA, and seventy-five (75) feet,
horizontal distance from the normal high-water line of other
water bodies, tributary streams, or the upland edge of a
wetland unless no reasonable alternative exists as determined
by the Planning Board. If no other reasonable alternative
exists, the road and/or driveway setback requirement shall be
no less than fifty (50) feet, horizontal distance, upon clear
showing by the applicant that appropriate techniques will be
used to prevent sedimentation of the water body, tributary
stream, or wetland. Such techniques may include, but are not
limited to, the installation of settling basins, and/or the
effective use of additional ditch relief culverts and turnouts
placed so as to avoid sedimentation of the water body,
tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or
driveway setback shall be increased by ten (10) feet,
horizontal distance, for each five (5) percent increase in
slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water
crossings or to roads or driveways that provide access to
permitted structures and facilities located nearer to the
shoreline or tributary stream due to an operational necessity,
excluding temporary docks for recreational uses. Roads and
driveways providing access to permitted structures within the
setback area shall comply fully with the requirements of
Section 15(H) (1) except for that portion of the road or
driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road
right of way regardless of their setback from a water body,
tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource
Protection District except that the Planning Board may grant a
permit to construct a road or driveway to provide access to
25
25
permitted uses within the district. A road or driveway may
also be approved by the Planning Board in a Resource
Protection District, upon a finding that no reasonable
alternative route or location is available outside the
district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back
as far as practicable from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of
two (2) horizontal to one (1) vertical, and shall be graded
and stabilized in accordance with the provisions for erosion
and sedimentation control contained in Section 15(Q).
(5) Road and driveway grades shall be no greater than ten (10)
percent except for segments of less than two hundred (200)
feet.
(6) In order to prevent road and driveway surface drainage from
directly
entering
water
bodies,
tributary
streams
or
wetlands, roads and driveways shall be designed, constructed,
and maintained to empty onto an unscarified buffer strip at
least (50) feet plus two times the average slope, in width
between the outflow point of the ditch or culvert and the
normal high-water line of a water body, tributary stream, or
upland edge of a wetland. Surface drainage which is directed
to an unscarified buffer strip shall be diffused or spread
out to promote infiltration of the runoff and to minimize
channelized flow of the drainage through the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and
water turnouts shall be installed in a manner effective in
directing drainage onto unscarified buffer strips before the
flow gains sufficient volume or head to erode the road,
driveway, or ditch. To accomplish this, the following shall
apply:
(a) Ditch relief culverts, drainage dips and associated water
turnouts shall be spaced along the road or driveway at
intervals no greater than indicated in the following
table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
26
26
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief
culverts only where the grade is ten (10) percent or less.
(c) On sections having slopes greater than ten (10) percent,
ditch relief culverts shall be placed at approximately a
thirty
(30)
degree
angle
downslope
from
a
line
perpendicular to the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and
properly installed in order to allow for effective
functioning and their inlet and outlet ends shall be
stabilized with appropriate materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other
storm water runoff control installations associated with
roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I
Signs. , The following provisions shall govern the use of signs in
the Resource Protection, Stream Protection, Limited Residential
and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises
shall be allowed, provided that such signs shall not exceed
six (6) square feet in area and shall not exceed two (2)
signs per premises. In the however, such signs shall not
exceed sixteen (16) square feet in area. Signs relating to
goods or services not sold or rendered on the premises shall
be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed
two (2) signs per premises, and shall not exceed twelve (12)
square feet in the aggregate.
(3) Residential users may display a single sign not over three
(3) square feet in area relating to the sale, rental, or
lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed
without restriction as to number provided that no such sign
shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without
restriction.
27
27
(6) No sign shall extend higher than twenty (20) feet above the
ground.
(7) Signs may be illuminated only by shielded, non-flashing
lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to
minimize storm water runoff from the site in excess of the
natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales,
terraces and wooded areas, shall be retained in order to
reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as
necessary to ensure proper functioning.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in
conformance with the State of Maine Subsurface Wastewater
Disposal Rules, and the following:
a) clearing or removal
of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than
seventy-five (75) feet, horizontal distance, from the normal
high-water line of a water body or the upland edge of a
wetland and b) a holding tank is not allowed for a first-time
residential use in the shoreland zone.
L. Essential Services
(1) Where feasible, the installation of essential services shall
be limited to existing public ways and existing service
corridors.
(2) The installation of essential services, other than road-side
distribution lines, is not allowed in a Resource Protection
or Stream Protection District, except to provide services to
a permitted use within said district, or except where the
applicant demonstrates that no reasonable alternative exists.
Where allowed, such structures and facilities shall be
located so as to minimize any adverse impacts on surrounding
uses and resources, including visual impacts.
(3) Damaged
or
destroyed
public
utility
transmission
and
distribution lines, towers and related equipment may be
replaced or reconstructed without a permit.
28
28
M. Mineral Exploration and Extraction. Mineral exploration to determine
the nature or extent of mineral resources shall be accomplished
by hand sampling, test boring, or other methods which create
minimal disturbance of less than one hundred (100) square feet
of ground surface. A permit from the Code Enforcement Officer
shall be required for mineral exploration which exceeds the
above limitation. All excavations, including test pits and
holes, shall be immediately capped, filled or secured by other
equally effective measures to restore disturbed areas and to
protect the public health and safety.
Mineral extraction may be permitted under the following
conditions:
(1) A reclamation plan shall be filed with, and approved, by the
Planning Board before a permit is granted. Such plan shall
describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M) (3) below.
(2) No part of any extraction operation, including drainage and
runoff control features, shall be permitted within one
hundred (100) feet, horizontal distance, of the normal high-
water line of a great pond classified GPA or a river flowing
to a great pond classified GPA, and within seventy-five (75)
feet, horizontal distance, of the normal high-water line of
any other water body, tributary stream, or the upland edge of
a wetland. Extraction operations shall not be permitted
within fifty (50) feet, horizontal distance, of any property
line without written permission of the owner of such adjacent
property.
(3) Within twelve (12) months following the completion of
extraction
operations
at
any
extraction
site,
which
operations shall be deemed complete when less than one
hundred (100) cubic yards of materials are removed in any
consecutive twelve (12) month period, ground levels and
grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed
for disposal in an approved location, or shall be buried
on-site. Only materials generated on-site may be buried
or covered on-site.
(b) The final graded slope shall be two and one-half to one (2
1/2:1) slope or flatter.
29
29
(c) Top soil or loam shall be retained to cover all disturbed
land areas, which shall be reseeded and stabilized with
vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to
complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning
Board may impose such conditions as are necessary to minimize
the adverse impacts associated with mineral extraction
operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance
with the Manure Utilization Guidelines published by the Maine
Department of Agriculture on November 1, 2001, and the
Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred
(100) feet, horizontal distance, of a great pond classified
GPA or a river flowing to a great pond classified GPA, or
within seventy-five (75) feet horizontal distance, of other
water bodies, tributary streams, or wetlands. All manure
storage areas within the shoreland zone must be constructed
or modified such that the facility produces no discharge of
effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater
than forty thousand (40,000) square feet in surface area,
within the shoreland zone shall require a Conservation Plan
to be filed with the Planning Board. Non-conformance with
the provisions of said plan shall be considered to be a
violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred
(100) feet, horizontal distance, of the normal high-water
line of a great pond classified GPA; within seventy-five (75)
feet, horizontal distance, from other water bodies; nor
within
twenty-five
(25)
feet,
horizontal
distance,
of
tributary streams and wetlands. Operations in existence on
the effective date of this ordinance and not in conformance
with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be
permitted within one hundred (100) feet, horizontal distance,
of the normal high-water line of a great pond classified GPA;
within seventy-five (75) feet, horizontal distance, of other
water bodies; nor within twenty-five (25) feet, horizontal
30
30
distance, of tributary streams and wetlands. Livestock
grazing associated with ongoing farm activities, and which
are not in conformance with the above setback provisions may
continue, provided that such grazing is conducted in
accordance with a Conservation Plan.
O. Timber Harvesting
(1) In a Resource Protection District abutting a great pond,
timber harvesting shall be limited to the following:
(a) Within the strip of land extending 75 feet, horizontal
distance, inland from the normal high-water line, timber
harvesting may be conducted when the following conditions
are met:
(1) The ground is frozen;
(2) There is no resultant soil disturbance;
(3) The removal of trees is accomplished using a cable or
boom and there is no entry of tracked or wheeled
vehicles into the 75-foot strip of land;
(4) There is no cutting of trees less than 6 inches in
diameter; no more than 30% of the trees 6 inches or more
in diameter, measured at 4 ½ feet above ground level,
are cut in any 10-year period; and a well-distributed
stand of trees and other natural vegetation remains; and
(5) A licensed professional forester has marked the trees to
be harvested prior to a permit being issued by the
municipality.
(b) Beyond the 75 foot strip referred to in Section 15(O) (1)
(a) above, timber harvesting is permitted in accordance
with paragraph 2 below except that in no case shall the
average residual basal area of trees over 4 ½ inches in
diameter at 4 1/2 feet above ground level be reduced to
less than 30 square feet per acre.
(2) Except in areas as described in Section 15(O) (1) above,
timber
harvesting
shall
conform
with
the
following
provisions:
(a) Selective cutting of no more than forty (40) percent of
the total volume of trees four (4) inches or more in
diameter measured at 4 1/2 feet above ground level on any
31
31
lot in any ten (10) year period is permitted. In
addition:
(i) Within one-hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond classified
GPA or a river flowing to a great pond classified GPA,
and within seventy-five (75) feet, horizontal distance,
of the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland,
there shall be no clear-cut openings and a well-
distributed
stand
of
trees
and
other
vegetation,
including existing ground cover, shall be maintained.
(ii) At distances greater than one-hundred (100) feet,
horizontal distance, of a great pond classified GPA or a
river flowing to a great pond classified GPA, and
greater
than
seventy-five
(75)
feet,
horizontal
distance, of the normal high-water line of other water
bodies or the upland edge of a wetland, harvesting
operations shall not create single clear-cut openings
greater than ten-thousand (10,000) square feet in the
forest canopy. Where such openings exceed five-thousand
(5000) square feet they shall be at least one hundred
(100) feet, horizontal distance, apart. Such clear-cut
openings shall be included in the calculation of total
volume removal. Volume may be considered to be
equivalent to basal area.
(b) Timber harvesting operations exceeding the 40% limitation
in Section 15(O) (2) (a) above, may be allowed by the
planning board upon a clear showing, including a forest
management plan signed by a Maine licensed professional
forester, that such an exception is necessary for good forest
management and will be carried out in accordance with the
purposes of this Ordinance. The planning board shall notify
the Commissioner of the Department of Environmental Protection
of each exception allowed, within fourteen (14) days of the
planning board's decision.
(c) No accumulation of slash shall be left within fifty (50)
feet, horizontal distance, of the normal high-water line
of a water body. In all other areas slash shall either be
removed or disposed of in such a manner that it lies on
the ground and no part thereof extends more than four (4)
feet above the ground. Any debris that falls below the
normal high-water line of a water body or tributary stream
shall be removed.
32
32
(d) Timber harvesting equipment shall not use stream channels
as travel routes except when:
(i) Surface waters are frozen; and
(ii) The activity will not result in any ground disturbance.
(e) All crossings of flowing water shall require a bridge or
culvert, except in areas with low banks and channel beds
which are composed of gravel, rock or similar hard surface
which would not be eroded or otherwise damaged.
(f) Skid trail approaches to water crossings shall be located
and designed so as to prevent water runoff from directly
entering the water body or tributary stream. Upon
completion of timber harvesting, temporary bridges and
culverts shall be removed and areas of exposed soil
revegitated.
(g) Except for water crossings, skid trails and other sites
where the operation of machinery used in timber harvesting
results in the exposure of mineral soil shall be located
such that an unscarified strip of vegetation of at least
seventy-five (75) feet, horizontal distance, in width for
slopes up to ten (10) percent shall be retained between
the exposed mineral soil and the normal high-water line of
a water body or upland edge of a wetland. For each ten
(10) percent increase in slope, the unscarified strip
shall be increased by twenty (20) feet, horizontal
distance. The provisions of this paragraph apply only to
a face sloping toward the water body or wetland, provided,
however, that no portion of such exposed mineral soil on a
back face shall be closer than twenty five (25) feet,
horizontal distance, from the normal high-water line of a
water body or upland edge of a wetland.
O-1. Timber Harvesting - Statewide Standards [Effective on effective date
established in Section 4(B)]
(1) Shoreline integrity and sedimentation.
Persons conducting
timber harvesting and related activities must take reasonable
measures to avoid the disruption of shoreline integrity, the
occurrence of sedimentation of water, and the disturbance of
water body and tributary stream banks, water body and
tributary stream channels, shorelines, and soil lying within
water bodies, tributary streams and wetlands. If, despite
33
33
such precautions, the disruption of shoreline integrity,
sedimentation of water, or the disturbance of water body and
tributary stream banks, water body and tributary stream
channels, shorelines, and soil lying within water bodies,
tributary streams and wetlands occurs, such conditions must
be corrected.
(2) Slash treatment. Timber harvesting and related activities
shall be conducted such that slash or debris is not left
below the normal high-water line of any water body or
tributary stream, or the upland edge of a wetland. Section
15(O-1)(2) does not apply to minor, incidental amounts of
slash that result from timber harvesting and related
activities otherwise conducted in compliance with this
section.
(a) Slash actively used to protect soil from disturbance by
equipment or to stabilize exposed soil, may be left in
place, provided that no part thereof extends more than 4
feet above the ground.
(b) Adjacent to great ponds, rivers and wetlands:
(i) No accumulation of slash shall be left within 50 feet,
horizontal distance, of the normal high-water line or
upland edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of
the normal high-water line or upland edge of a wetland,
all slash larger than 3 inches in diameter must be
disposed of in such a manner that no part thereof
extends more than 4 feet above the ground.
(3) Timber harvesting and related activities must leave adequate
tree cover and shall be conducted so that a well-distributed
stand of trees is retained. This requirement may be
satisfied by following one of the following three options:
(a) Option 1 (40% volume removal), as follows:
(i)
Harvesting of no more than 40 percent of the
total volume on each acre of trees 4.5 inches DBH or
greater in any 10 year period is allowed. Volume may be
considered to be equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm,
and other vegetation including existing ground cover,
must be maintained; and,
34
34
(iii) Within 75 feet, horizontal distance, of the normal
high-water line of rivers, streams, and great ponds, and
within 75 feet, horizontal distance, of the upland edge
of a wetland, there must be no cleared openings. At
distances greater than 75 feet, horizontal distance, of
the normal high-water line of a river or great pond or
upland edge of a wetland, timber harvesting and related
activities must not create single cleared openings
greater than 14,000 square feet in the forest canopy.
Where such openings exceed 10,000 square feet, they must
be at least 100 feet, horizontal distance, apart. Such
cleared openings will be included in the calculation of
total volume removal. Volume may be considered
equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as
follows:
(i) The residual stand must contain an average basal area of
at least 60 square feet per acre of woody vegetation
greater than or equal to 1.0 inch DBH, of which 40
square feet per acre must be greater than or equal to
4.5 inches DBH;
(ii) A well-distributed stand of trees which is windfirm,
and other vegetation including existing ground cover,
must be maintained; and,
(iii)Within 75 feet, horizontal distance, of the normal high-
water line of water bodies and within 75 feet,
horizontal distance, of the upland edge of wetlands,
there must be no cleared openings. At distances greater
than 75 feet, horizontal distance, of the normal high-
water line of a river or great pond, or upland edge of a
wetland, timber harvesting and related activities must
not create single cleared openings greater than 14,000
square feet in the forest canopy. Where such openings
exceed 10,000 square feet, they must be at least 100
feet, horizontal distance, apart. Such cleared openings
will be included in the calculation of the average basal
area. Volume may be considered equivalent to basal
area.
(c) Option 3 (Outcome based), which requires: An alternative
method proposed in an application, signed by a Licensed
Forester or certified wildlife professional, submitted by
the landowner or designated agent to the State of Maine
Department of Conservation's Bureau of Forestry (Bureau)
35
35
for review and approval, which provides equal or better
protection of the shoreland area than this rule.
Landowners must designate on the Forest Operations Notification
form required by 12 M.R.S.A. chapter 805, subchapter 5 which
option they choose to use. If landowners choose Option 1 or
Option 2, compliance will be determined solely on the criteria
for the option chosen. If landowners choose Option 3, timber
harvesting and related activities may not begin until the
Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-
distributed stand of trees is retained through a field
procedure that uses sample plots that are located randomly or
systematically to provide a fair representation of the harvest
area.
(4) Skid trails, yards, and equipment operation. This requirement
applies to the construction,
maintenance, and use of skid trails and yards in shoreland
areas.
(a) Equipment used in timber harvesting and related activities
shall not use river, stream or tributary stream channels as
travel routes except when surface waters are frozen and snow
covered, and the activity will not result in any ground
disturbance.
(b) Skid trails and yards must be designed and constructed to
prevent sediment and concentrated water runoff from entering
a water body, tributary stream, or wetland. Upon termination
of their use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of
mineral soil within 25 feet, horizontal distance, of any
water body, tributary stream, or wetland. On slopes of 10
percent or greater, the setback for equipment operation
must be increased by 20 feet, horizontal distance, plus an
additional 10 feet, horizontal distance, for each 5
percent increase in slope above 10 percent. Where slopes
fall away from the resource, no increase in the 25-foot
setback is required.
(ii) Where
such
setbacks
are
impracticable,
appropriate
techniques shall be used to avoid sedimentation of the
water body, tributary stream or wetland. Such techniques
may include the installation of sump holes or settling
36
36
basins, and/or the effective use of additional ditch
relief culverts and ditch water turnouts placed to avoid
sedimentation of the water body, tributary stream, or
wetland. If, despite such precautions, sedimentation or
the
disruption
of
shoreline
integrity
occurs,
such
conditions must be corrected.
(5) Land
Management
Roads.
Land
management
roads,
including
approaches to crossings of water bodies, tributary stream
channels, and wetlands, ditches and other related structures,
must be designed, constructed, and maintained to prevent
sediment and concentrated water runoff from directly entering
the water body, tributary stream or wetland. Surface water on
or adjacent to water crossing approaches must be diverted
through vegetative filter strips to avoid sedimentation of the
watercourse or wetland. Because roadside ditches may not extend
to the resource being crossed, vegetative filter strips must be
established in accordance with the setback requirements in
Section 15(O-1)(7) of this rule.
(a) Land management roads and associated ditches, excavation,
and fill must be set back at least:
(i)
100 feet, horizontal distance, from the normal high-
water line of a great pond, river or wetland;
(ii)
50 feet, horizontal distance, from the normal high-
water line of streams; and
(iii)25 feet, horizontal distance, from the normal high-water
line of tributary streams
(b) The minimum 100 foot setback specified in Section 15(O-
1)(5)(a)(i) above may be reduced to no less than 50 feet,
horizontal distance, and the 50 foot setback specified in
Section 15(O-1)(5)(a)(ii) above may be reduced to no less
than 25 feet, horizontal distance, if, prior to construction,
the
landowner
or
the
landowner's
designated
agent
demonstrates to the Planning Board's satisfaction that no
reasonable alternative exists and that appropriate techniques
will be used to prevent sedimentation of the water body,
tributary stream, or wetland. Such techniques may include,
but are not limited to, the installation of settling basins,
and/or the effective use of additional ditch relief culverts
and turnouts placed to avoid sedimentation of the water body,
tributary stream or wetland. If, despite such precautions,
sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
37
37
(c) On slopes of 10 percent or greater, the land management road
setback must be increased by at least 20 feet, horizontal
distance, plus an additional 10 feet, horizontal distance,
for each 5 percent increase in slope above 10 percent.
(d) New land management roads are not allowed within the
shoreland area along Significant River Segments as identified
in 38 M.R.S.A. section 437, nor in a Resource Protection
District, unless, prior to construction, the landowner or the
landowner's designated agent makes a clear demonstration to
the
Planning
Board's
satisfaction
that
no
reasonable
alternative route exists outside the shoreland zone, and that
the new road must be set back as far as practicable from the
normal high-water line and screened from the river by
existing vegetation.
(e) Ditches, culverts, bridges, dips, water turnouts and other
water control installations associated with roads must be
maintained
on
a
regular
basis
to
assure
effective
functioning. Drainage structures shall deliver a dispersed
flow of water into an unscarified filter strip no less than
the width indicated in the setback requirements in Section
15(O-1)(7). Where such a filter strip is impracticable,
appropriate techniques shall be used to avoid sedimentation
of the water body, tributary stream, or wetland. Such
techniques may include the installation of sump holes or
settling basins, and/or the effective use of additional ditch
relief culverts and ditch water turnouts placed to avoid
sedimentation of the water body, tributary stream, or
wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions
must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water
control installations required in Section 15(O-1)(5)(e) must
continue until use of the road is discontinued and the road
is put to bed by effective installation of water bars or
other adequate road drainage structures at appropriate
intervals, constructed to avoid surface water flowing over or
under the water bar, and extending a sufficient distance
beyond the traveled way so that water does not reenter the
road surface.
(g) Upgrading existing roads. Extension or enlargement of
presently existing
roads must conform to the provisions of Section 15(O-1). Any
nonconforming existing
road may continue to exist and to be maintained, as long as
the nonconforming
38
38
conditions are not made more nonconforming.
(h) Exception. Extension or enlargement of presently existing
roads need not conform
to the setback requirements of Section 15(O-1)(5)(a) if,
prior to extension or enlargement, the landowner or the
landowner's designated agent demonstrates to the Planning
Board's satisfaction that no reasonable alternative exists
and that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or
wetland. Such techniques may include, but are not limited to,
the installation of settling basins, and/or the effective use
of additional ditch relief culverts and turnouts placed to
avoid sedimentation of the water body, tributary stream, or
wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be
corrected.
(i) Additional measures. In addition to the foregoing minimum
requirements,
persons undertaking construction and maintenance of roads and
river, stream and tributary stream crossings must take
reasonable measures to avoid sedimentation of surface waters.
(6) Crossings of water bodies. Crossings of rivers, streams, and
tributary streams must allow for fish passage at all times of
the year, must not impound water, and must allow for the
maintenance of normal flows.
(a) Determination of flow. Provided they are properly applied
and used for the circumstances for which they are designed,
methods including but not limited to the following are
acceptable as a means of calculating the 10 year and 25 year
frequency water flows and thereby determining water crossing
sizes as required in Section 15(O-1): The United States
Geological Survey (USGS) Methods; specifically: Hodgkins, G.
1999. Estimating the Magnitude of Peak Flows for Streams in
Maine for Selected Recurrence Intervals. U.S. Geological
Survey. Water Resources Investigations Report 99-4008. 45 pp.
(b) Upgrading existing water crossings. Extension or enlargement
of presently existing water crossings must conform to the
provisions of Section 15(O-1). Any nonconforming existing
water crossing may continue to exist and be maintained, as
long as the nonconforming conditions are not made more
nonconforming; however, any maintenance or repair work done
below the normal high-water line must conform to the
provisions of Section 15(O-1).
39
39
(c) Other Agency Permits. Any timber harvesting and related
activities
involving
the
design,
construction,
and
maintenance of crossings on water bodies other than a river,
stream or tributary stream may require a permit from the Land
Use Regulation Commission, the Department of Environmental
Protection, or the US Army Corps of Engineers.
(d) Any timber harvesting and related activities involving the
design,
construction,
and
maintenance
of
crossings
of
wetlands identified by the Department of Inland Fisheries and
Wildlife
as
essential
wildlife
habitat
require
prior
consultation with the Department of Inland Fisheries and
Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water
crossing
construction
maintenance,
alteration
and
replacement activities in shoreland areas must be given to
the Bureau prior to the commencement of such activities.
Such notice must contain all information required by the
Bureau, including:
(i) a map showing the location of all proposed permanent
crossings;
(ii) the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires
a permit from state or federal agencies, a copy of the
approved permit or permits; and
(iv) a statement signed by the responsible party that all
temporary and permanent crossings will be constructed,
maintained, and closed out in accordance with the
requirements of this Section.
(f) Water crossing standards. All crossings of rivers require a
bridge or culvert sized according to the requirements of
Section 15(O-1)(6)(g)) below. Streams and tributary streams
may be crossed using temporary structures that are not
bridges or culverts provided:
(i)
concentrated water runoff does not enter the stream
or tributary stream;
(ii)
sedimentation
of
surface
waters
is
reasonably
avoided;
(iii) there is no substantial disturbance of the bank, or
stream or tributary stream channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded.
Subject to Section 15(O-1)(6)(f)(i-v) above, skid trail
40
40
crossings of streams and tributary streams when channels of
such streams and tributary streams are frozen and snow-
covered or are composed of a hard surface which will not be
eroded or otherwise damaged are not required to use permanent
or temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and
tributary stream channels with a bridge or culvert, the
following requirements apply:
(i)
Bridges and culverts must be installed and maintained
to provide an opening sufficient in size and structure to
accommodate 10 year frequency water flows or with a cross-
sectional area at least equal to 2 1/2 times the cross-
sectional area of the river, stream, or tributary stream
channel.
(ii) Temporary bridge and culvert sizes may be smaller than
provided in Section 15(O-1)(6)(g)(i) if techniques are
effectively employed such that in the event of culvert or
bridge failure, the natural course of water flow is
maintained
and
sedimentation
of
the
water
body
or
tributary stream is avoided. Such crossing structures must
be at least as wide as the channel and placed above the
normal high-water line. Techniques may include, but are
not limited to, the effective use of any, a combination
of, or all of the following:
1. use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen ground
conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream
crossings must:
1. be installed at or below river, stream or tributary
stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of
the culvert;
4. be covered by soil to a minimum depth of 1 foot or
according to the
culvert manufacturer's specifications, whichever is
greater; and
5. have a headwall at the inlet end which is adequately
stabilized by riprap
or other suitable means to reasonably avoid erosion
of material around the culvert.
41
41
(iv)River, stream and tributary stream crossings allowed under
Section 15(O-1), but located in flood hazard areas (i.e. A
zones) as identified on a community's Flood Insurance Rate
Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be
designed and constructed under the stricter standards
contained in that community's National Flood Insurance
Program (NFIP). For example, a water crossing may be
required to pass a 100-year flood event.
(v) Exception. Skid trail crossings of tributary streams
within shoreland areas and wetlands adjacent to such
streams may be undertaken in a manner not in conformity
with
the
requirements
of
the
foregoing
subsections
provided
persons
conducting
such
activities
take
reasonable measures to avoid the disruption of shoreline
integrity, the occurrence of sedimentation of water, and
the
disturbance
of
stream
banks,
stream
channels,
shorelines, and soil lying within ponds and wetlands. If,
despite such precautions, the disruption of shoreline
integrity, sedimentation of water, or the disturbance of
stream banks, stream channels, shorelines, and soil lying
within ponds and wetlands occurs, such conditions must be
corrected.
(h) Skid trail closeout. Upon completion of timber harvesting
and related activities, or upon the expiration of a Forest
Operations Notification, whichever is earlier, the following
requirements apply:
(i) Bridges and culverts installed for river, stream and
tributary stream crossings by skid trails must either be
removed and areas of exposed soil stabilized, or upgraded
to comply with the closeout standards for land management
roads in Section15(O-1)(6)(i) below.
(ii) Water crossing structures that are not bridges or culverts
must either be removed immediately following timber
harvesting and related activities, or, if frozen into the
river, stream or tributary stream bed or bank, as soon as
practical after snowmelt.
(iii)River, stream and tributary stream channels, banks and
approaches to crossings of water bodies and tributary
streams must be immediately stabilized on completion of
harvest, or if the ground is frozen and/or snow-covered,
as soon as practical after snowmelt. If, despite such
precautions, sedimentation or the disruption of shoreline
integrity occurs, such conditions must be corrected.
42
42
(i) Land management road closeout. Maintenance of the water
control features must continue until use of the road is
discontinued and the road is put to bed by taking the
following actions:
(i) Effective installation of water bars or other adequate
road
drainage
structures
at
appropriate
intervals,
constructed to reasonably avoid surface water flowing over
or under the water bar, and extending sufficient distance
beyond the traveled way so that water does not reenter the
road surface.
(ii) Water crossing structures must be appropriately sized or
dismantled and removed in a manner that reasonably avoids
sedimentation of the water body or tributary stream.
(iii)Any bridge or water crossing culvert in roads to be
discontinued
shall
satisfy
one
of
the
following
requirements:
1. it shall be designed to provide an opening sufficient in
size and structure to accommodate 25 year frequency
water flows;
2. it shall be designed to provide an opening with a cross-
sectional area at least 3 1/2 times the cross-sectional
area of the river, stream or tributary stream channel;
or
3. it shall be dismantled and removed in a fashion to
reasonably avoid sedimentation of the river, stream or
tributary stream.
If,
despite
such
precautions,
sedimentation
or
the
disruption of shoreline integrity occurs, such conditions
must be corrected.
Filter strips, skid trail setbacks, and land management road
setbacks must be maintained as specified in Section 15(O-1),
but in no case shall be less than shown in the following table.
43
43
Average slope of land between exposed mineral
Width of strip between exposed
soil and the shoreline (percent)
mineral soil and
shoreline
(feet along surface of the ground)
0
25
10
45
20
65
30
85
40
105
50
125
60
145
70
165
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond,
there shall be no cutting of vegetation within the strip of
land extending 75 feet, horizontal distance, inland from the
normal high-water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or
removal of vegetation shall be limited to that which is
necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, and
except to allow for the development of permitted uses, within
a strip of land extending one-hundred (100) feet, horizontal
distance, inland from the normal high-water line of a great
pond classified GPA or a river flowing to a great pond
classified GPA, and seventy-five (75) feet, horizontal
distance, from any other water body, tributary stream, or the
upland edge of a wetland, a buffer strip of vegetation shall
be preserved as follows:
(a) There shall be no cleared opening greater than 250 square
feet in the forest canopy (or other existing woody
vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown.
However, a footpath not to exceed six (6) feet in width as
measured between tree trunks and/or shrub stems is allowed
provided that a cleared line of sight to the water through
the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is
allowed provided that a well-distributed stand of trees
and other natural vegetation is maintained. For the
44
44
purposes of Section 15(P)(2)(b) a "well-distributed stand
of trees" adjacent to a great pond classified GPA or a
river or stream flowing to a great pond classified GPA,
shall be defined as maintaining a rating score of 24 or
more in each 25-foot by 50-foot rectangular (1250 square
feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - < 4 in.
1
4 - <8 in.
2
8-< 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and
wetlands, a "well-distributed stand of trees" is defined
as maintaining a minimum rating score of 16 per 25-foot
by 50-foot rectangular area..
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be
established where the landowner or lessee proposes
clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not
overlap a previous plot;
(iii)Any plot not containing the required points must have
no vegetation removed except as otherwise allowed by
this Ordinance;
(iv) Any plot containing the required points may have
vegetation
removed
down
to
the
minimum
points
required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the
points on any 25-foot by 50-foot rectangular area may
consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural
vegetation" is defined as retaining existing vegetation
under three (3) feet in height and other ground cover and
retaining at least five (5) saplings less than two (2)
inches in diameter at four and one half (4 ½) feet above
ground level for each 25-foot by 50-foot rectangle area.
If five saplings do not exist, no woody stems less than
two (2) inches in diameter can be removed until 5 saplings
have been recruited into the plot.
45
45
Notwithstanding the above provisions, no more than 40% of
the total volume of trees four (4) inches or more in
diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat,
existing vegetation under three (3) feet in height and
other ground cover, including leaf litter and the forest
duff layer, shall not be cut, covered, or removed, except
to provide for a footpath or other permitted uses as
described in Section 15(P) paragraphs (2) and (2)(a)
above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is
allowed.
(e) In order to maintain a buffer strip of vegetation, when
the removal of storm-damaged, diseased, unsafe, or dead
trees results in the creation of cleared openings, these
openings shall be replanted with native tree species
unless existing new tree growth is present.
Section 15(P)(2) does not apply to those portions of public
recreational facilities adjacent to public swimming areas as
long as cleared areas are limited to the minimum area
necessary.
(3) At distances greater than one hundred (100) feet, horizontal
distance, from a great pond classified GPA or a river flowing
to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of any
other water body, tributary stream, or the upland edge of a
wetland, there shall be allowed on any lot, in any ten (10)
year period, selective cutting of not more than forty (40)
percent of the volume of trees four (4) inches or more in
diameter, measured 4 1/2 feet above ground level. Tree
removal in conjunction with the development of permitted uses
shall be included in the forty (40) percent calculation. For
the purposes of these standards volume may be considered to
be equivalent to basal area.
In no event shall cleared openings for any purpose, including
but not limited to, principal and accessory structures,
driveways, lawns and sewage disposal areas, exceed in the
aggregate, 25% of the lot area within the shoreland zone or
ten thousand (10,000) square feet, whichever is greater,
including land previously cleared. This provision shall not
apply to the General Development Districts.
46
46
(4) Legally existing nonconforming cleared openings may be
maintained, but shall not be enlarged, except as allowed by
this Ordinance.
(5) Fields and other cleared openings which have reverted to
primarily shrubs, trees, or other woody vegetation shall be
regulated under the provisions of Section 15(P).
Q. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or
other similar activities which result in unstabilized soil
conditions and which require a permit shall also require a
written soil erosion and sedimentation control plan. The
plan shall be submitted to the permitting authority for
approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt
fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls
or rip-rap.
(2) In order to create the least potential for erosion,
development shall be designed to fit with the topography and
soils of the site. Areas of steep slopes where high cuts and
fills may be required shall be avoided wherever possible, and
natural contours shall be followed as closely as possible.
(3) Erosion and sedimentation control measures shall apply to all
aspects of the proposed project involving land disturbance,
and shall be in operation during all stages of the activity.
The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently
stabilized within one (1) week from the time it was last
actively worked, by use of riprap, sod, seed, and mulch, or
other
effective
measures.
In
all
cases
permanent
stabilization shall occur within nine (9) months of the
initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at
least one (1) bale per five hundred (500) square feet and
shall be maintained until a catch of vegetation is
established.
47
47
(b) Anchoring the mulch with netting, peg and twine or other
suitable method may be required to maintain the mulch
cover.
(c) Additional measures shall be taken where necessary in
order to avoid siltation into the water. Such measures
may include the use of staked hay bales and/or silt
fences.
(5) Natural and man-made drainage ways and drainage outlets shall
be protected from erosion from water flowing through them.
Drainage ways shall be designed and constructed in order to
carry water from a twenty five (25) year storm or greater,
and shall be stabilized with vegetation or lined with riprap.
R. Soils. All land uses shall be located on soils in or upon which
the proposed uses or structures can be established or
maintained without causing adverse environmental impacts,
including
severe
erosion,
mass
soil
movement,
improper
drainage,
and
water
pollution,
whether
during
or
after
construction.
Proposed
uses
requiring
subsurface
waste
disposal, and commercial or industrial development and other
similar intensive land uses, shall require a soils report based
on an on-site investigation and be prepared by state-certified
professionals. Certified persons may include Maine Certified
Soil Scientists, Maine Registered Professional Engineers, Maine
State Certified Geologists and other persons who have training
and experience in the recognition and evaluation of soil
properties. The report shall be based upon the analysis of the
characteristics of the soil and surrounding land and water
areas, maximum ground water elevation, presence of ledge,
drainage conditions, and other pertinent data which the
evaluator deems appropriate. The soils report shall include
recommendations
for
a
proposed
use
to
counteract
soil
limitations where they exist.
S. Water Quality. No activity shall deposit on or into the ground or
discharge to the waters of the State any pollutant that, by
itself or in combination with other activities or substances,
will impair designated uses or the water classification of the
water body, tributary stream or wetland.
T. Archaeological Site. Any proposed land use activity involving
structural development or soil disturbance on or adjacent to
sites listed on, or eligible to be listed on the National
Register of Historic Places, as determined by the permitting
authority, shall be submitted by the applicant to the Maine
48
48
Historic Preservation Commission for review and comment, at
least twenty (20) days prior to action being taken by the
permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a
decision on the application.
49
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer
shall be appointed or reappointed annually by July
1st.
(2) Board of Appeals. A Board of Appeals shall be created
in accordance with the provisions of 30-A M.R.S.A.
section 2691.
(3) Planning Board. A Planning Board shall be created in
accordance with the provisions of State law.
B. Permits Required. After the effective date of this
Ordinance no person shall, without first obtaining a
permit, engage in any activity or use of land or
structure requiring a permit in the district in which
such activity or use would occur; or expand, change, or
replace an existing use or structure; or renew a
discontinued nonconforming use. A person who is issued
a permit pursuant to this Ordinance shall have a copy
of the permit on site while the work authorized by the
permit is performed.
(1)
A permit is not required for the replacement of an
existing road culvert as long as:
(a) The replacement culvert is not more than 25%
longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75
feet; and
(c) Adequate erosion control measures are taken to
prevent sedimentation of the water, and the
crossing does not block fish passage in the
watercourse.
50
lA
(2) A permit is not required for an archaeological
excavation as long as the excavation is conducted by
an archaeologist listed on the State Historic
Preservation Officer's level 1 or level 2 approved
list, and unreasonable erosion and sedimentation is
prevented by means of adequate and timely temporary
and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in
addition to any other permit required by other law
or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a
written application, including a scaled site plan,
on a form provided by the municipality, to the
appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or
individual who can show evidence of right, title or
interest
in
the
property
or
by
an
agent,
representative, tenant, or contractor of the owner
with authorization from the owner to apply for a
permit hereunder, certifying that the information in
the application is complete and correct.
(3) All applications shall be dated, and the Code
Enforcement
Officer
or
Planning
Board,
as
appropriate, shall note upon each application the
date and time of its receipt.
(4) If the property is not served by a public sewer, a
valid plumbing permit or a completed application for
a plumbing permit, including the site evaluation
approved
by
the
Plumbing
Inspector,
shall
be
submitted whenever the nature of the proposed
structure or use would require the installation of a
subsurface sewage disposal system.
D. Procedure for Administering Permits. Within 35 days of the
date of receiving a written application, the Planning
Board or Code Enforcement Officer, as indicated in
Section 14, shall notify the applicant in writing
either that the application is a complete application,
51
or, if the application is incomplete, that specified
additional material is needed to make the application
complete. The Planning Board or the Code Enforcement
Officer, as appropriate, shall approve, approve with
conditions, or deny all permit applications in writing
within 35 days of receiving a completed application.
However, if the Planning Board has a waiting list of
applications, a decision on the application shall occur
within 35 days after the first available date on the
Planning Board's agenda following receipt of the
completed application, or within 35 days of the public
hearing, if the proposed use or structure is found to
be in conformance with the purposes and provisions of
this Ordinance.
The applicant shall have the burden of proving that the
proposed land use activity is in conformity with the
purposes and provisions of this Ordinance.
After the submission of a complete application to the
Planning Board, the Board shall approve an application
or approve it with conditions if it makes a positive
finding based on the information presented that the
proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or
sedimentation to surface waters;
(3) Will adequately provide for the disposal of all
wastewater;
(4) Will not have an adverse impact on spawning grounds,
fish, aquatic life, bird or other wildlife habitat;
(5) Will conserve shore cover and visual, as well as
actual, points of access to inland waters;
(6) Will protect archaeological and historic resources
as designated in the comprehensive plan;
(7) Will avoid problems associated with floodplain
development and use; and
52
lA
(8) Is in conformance with the provisions of Section 15,
Land Use Standards.
If a permit is either denied or approved with
conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an
application involving a structure if the structure
would be located in an unapproved subdivision or would
violate any other local ordinance, or regulation or
statute administered by the municipality.
E. Special Exceptions. In addition to the criteria specified
in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit
for a single family residential structure in a Resource
Protection
District
provided
that
the
applicant
demonstrates that all of the following conditions are
met:
(1) There is no location on the property, other than a
location within the Resource Protection District,
where the structure can be built.
(2) The lot on which the structure is proposed is
undeveloped and was established and recorded in the
registry of deeds of the county in which the lot is
located
before
the
adoption
of
the
Resource
Protection District.
(3) All proposed buildings, sewage disposal systems and
other improvements are:
(a) Located on natural ground slopes of less than 20%;
and
(b) Located outside the floodway of the 100-year
flood-plain along rivers and artificially formed
great ponds along rivers, based on detailed flood
insurance studies and as delineated on the Federal
Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at
least one foot above the 100-year flood-plain
elevation; and the development is otherwise in
53
compliance with any applicable municipal flood-
plain ordinance.
If the floodway is not shown on the Federal
Emergency Management Agency Maps, it is deemed to
be 1/2 the width of the 100-year flood-plain.
(4) The total ground-floor area, including cantilevered
or similar overhanging extensions, of all principal
and accessory structures is limited to a maximum of
1,500 square feet. This limitation shall not be
altered by variance.
(5) All structures, except functionally water-dependent
structures, are set back from the normal high-water
line of a water body, tributary stream or upland
edge of a wetland to the greatest practical extent,
but not less than 75 feet, horizontal distance. In
determining the greatest practical extent, the
Planning Board shall consider the depth of the lot,
the slope of the land, the potential for soil
erosion, the type and amount of vegetation to be
removed, the proposed building site's elevation in
regard to the flood-plain, and its proximity to
moderate-value and high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the
date of issuance if a substantial start is not made in
construction or in the use of the property during that
period. If a substantial start is made within one year
of the issuance of the permit, the applicant shall have
one additional year to complete the project, at which
time the permit shall expire.
G. Installation of Public Utility Service. A public utility, water
district, sanitary district or any utility company of
any kind may not install services to any new structure
located
in
the
shoreland
zone
unless
written
authorization attesting to the validity and currency of
all local permits required under this or any previous
Ordinance has been issued by the appropriate municipal
officials or other written arrangements have been made
between the municipal officials and the utility.
54
lA
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board
of Appeals shall have the following powers:
(a) Administrative
Appeals:
To
hear
and
decide
administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that
there is an error in any order, requirement,
decision, or determination made by, or failure to
act by, the Planning Board in the administration of
this
Ordinance;
and
to
hear
and
decide
administrative appeals on a de novo basis where it
is alleged by an aggrieved party that there is an
error in any order, requirement, decision or
determination made by, or failure to act by, the
Code Enforcement Officer in his or her review of
and action on a permit application under this
Ordinance. Any order, requirement, decision or
determination made, or failure to act, in the
enforcement of this ordinance is not appealable to
the Board of Appeals.
(b) Variance Appeals: To authorize variances upon
appeal, within the limitations set forth in this
Ordinance.
(2) Variance Appeals. Variances may be granted only
under the following conditions:
(a) Variances may be granted only from dimensional
requirements including, but not limited to, lot
width, structure height, percent of lot coverage,
and setback requirements.
(b) Variances shall not be granted for establishment of
any uses otherwise prohibited by this Ordinance.
(c) The Board shall not grant a variance unless it
finds that:
(i) The proposed structure or use would meet the
provisions of Section 15 except for the specific
55
provision which has created the non-conformity
and from which relief is sought; and
(ii) The strict application of the terms of this
Ordinance would result in undue hardship. The
term "undue hardship" shall mean:
a. That the land in question cannot yield a
reasonable
return
unless
a
variance
is
granted;
b. That the need for a variance is due to the
unique circumstances of the property and not
to the general conditions in the neighborhood;
c. That the granting of a variance will not alter
the essential character of the locality; and
d. That the hardship is not the result of action
taken by the applicant or a prior owner.
(d) Notwithstanding
Section
16(H)(2)(c)(ii)
above,
the Board of Appeals may grant a variance to
an owner of a residential dwelling for the purpose
of making that dwelling accessible to a person with
a disability who resides in or regularly uses the
dwelling. The board shall restrict any variance
granted
under
this
subsection
solely
to
the
installation of equipment or the construction of
structures necessary for access to or egress from
the dwelling by the person with the disability. The
board may impose conditions on the variance,
including limiting the variance to the duration of
the disability or to the time that the person with
the disability lives in the dwelling. The term
"structures necessary for access to or egress from
the dwelling" shall include railing, wall or roof
systems necessary for the safety or effectiveness
of the structure.
(e) The Board of Appeals shall limit any variances
granted as strictly as possible in order to ensure
conformance with the purposes and provisions of
this Ordinance to the greatest extent possible, and
56
lA
in doing so may impose such conditions to a variance
as it deems necessary. The party receiving the
variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the
application and all supporting information supplied
by the applicant, shall be forwarded by the
municipal officials to the Commissioner of the
Department of Environmental Protection at least
twenty (20) days prior to action by the Board of
Appeals.
Any
comments
received
from
the
Commissioner prior to the action by the Board of
Appeals shall be made part of the record and shall
be taken into consideration by the Board of
Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the
Code Enforcement Officer the Board of Appeals shall
hold a "de novo" hearing. At this time the Board may
receive and consider new evidence and testimony, be
it oral or written. When acting in a "de novo"
capacity the Board of Appeals shall hear and decide
the matter afresh, undertaking its own independent
analysis of evidence and the law, and reaching its
own decision.
When the Board of Appeals hears a decision of the
Planning Board, it shall hold an appellate hearing,
and may reverse the decision of the Planning Board
only upon finding that the decision was contrary to
specific provisions of the Ordinance or contrary to
the facts presented to the Planning Board. The Board
of Appeals may only review the record of the
proceedings before the Planning Board. The Board
Appeals shall not receive or consider any evidence
which was not presented to the Planning Board, but
the Board of Appeals may receive and consider written
or
oral
arguments.
If
the
Board
of
Appeals
determines that the record of the Planning Board
proceedings are inadequate, the Board of Appeals may
remand
the
matter
to
the
Planning
Board
for
additional fact finding.
57
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be
taken to the Board of Appeals by an aggrieved
party from any decision of the Code Enforcement
Officer or the Planning Board, except for
enforcement-related
matters
as
described
in
Section 16(H)(1)(a) above. Such an appeal shall
be taken within thirty (30) days of the date of
the official, written decision appealed from,
and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30)
day requirement.
(ii) Applications for appeals shall be made by filing
with the Board of Appeals a written notice of
appeal which includes:
a. A concise written statement indicating what
relief is requested and why the appeal or
variance should be granted.
b. A sketch drawn to scale showing lot lines,
location of existing buildings and structures
and
other
physical
features
of
the
lot
pertinent to the relief sought.
(iii)Upon
receiving
an
application
for
an
administrative appeal or a variance, the Code
Enforcement
Officer
or
Planning
Board,
as
appropriate, shall transmit to the Board of
Appeals all of the papers constituting the
record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing
on an administrative appeal or a request for a
variance within thirty-five (35) days of its
receipt
of
a
complete
written
application,
unless this time period is extended by the
parties.
(b) Decision by Board of Appeals
58
lA
(i) A majority of the full voting membership of
the Board shall constitute a quorum for the
purpose of deciding an appeal.
(ii) The person filing the appeal shall have the
burden of proof.
(iii)The Board shall decide all administrative
appeals and variance appeals within thirty
five (35) days after the close of the hearing,
and shall issue a written decision on all
appeals.
(iv) The Board of Appeals shall state the reasons
and basis for its decision, including a
statement of the facts found and conclusions
reached by the Board. The Board shall cause
written notice of its decision to be mailed or
hand-delivered to the applicant and to the
Department of Environmental Protection within
seven (7) days of the Board's decision.
Copies of written decisions of the Board of
Appeals shall be given to the Planning Board,
Code Enforcement Officer, and the municipal
officers.
(5) Appeal to Superior Court. Except as provided by 30-A
M.R.S.A. section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before
the Board of Appeals may take an appeal to Superior
Court in accordance with State laws within forty-five
(45) days from the date of any decision of the Board
of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A.
section
2691(3)(F),
the
Board
of
Appeals
may
reconsider any decision within forty-five (45) days
of its prior decision. A request to the Board to
reconsider a decision must be filed within ten (10)
days of the decision that is being reconsidered. A
vote to reconsider and the action taken on that
reconsideration must occur and be completed within
forty-five (45) days of the date of the vote on the
original decision. Reconsideration of a decision
59
shall require a positive vote of the majority of the
Board members originally voting on the decision, and
proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other
parties of interest, including abutters and those who
testified at the original hearing(s). The Board may
conduct additional hearings and receive additional
evidence and testimony.
Appeal of a reconsidered decision to Superior Court
must be made within fifteen (15) days after the
decision on reconsideration.
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be
deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement
Officer
to
enforce
the
provisions
of
this
Ordinance. If the Code Enforcement Officer shall
find that any provision of this Ordinance is being
violated, he or she shall notify in writing the
person responsible for such violation, indicating
the nature of the violation and ordering the action
necessary to correct it, including discontinuance
of illegal use of land, buildings or structures, or
work being done, removal of illegal buildings or
structures, and abatement of nuisance conditions.
A copy of such notices shall be submitted to the
municipal officers and be maintained as a permanent
record.
(b) The Code Enforcement Officer shall conduct on-site
inspections
to
insure
compliance
with
all
applicable laws and conditions attached to permit
approvals. The Code Enforcement Officer shall also
investigate all complaints of alleged violations of
this Ordinance.
60
lA
(c) The Code Enforcement Officer shall keep a complete
record of all essential transactions of the office,
including applications submitted, permits granted
or denied, variances granted or denied, revocation
actions, revocation of permits, appeals, court
actions, violations investigated, violations found,
and fees collected. On a biennial basis, a summary
of this record shall be submitted to the Director
of the Bureau of Land and Water Quality within the
Department of Environmental Protection.
(3) Legal Actions. When the above action does not result
in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon
notice from the Code Enforcement Officer, are hereby
directed to institute any and all actions and
proceedings, either legal or equitable, including
seeking injunctions of violations and the imposition
of fines, that may be appropriate or necessary to
enforce the provisions of this Ordinance in the name
of the municipality. The municipal officers, or
their authorized agent, are hereby authorized to
enter into administrative consent agreements for the
purpose of eliminating violations of this Ordinance
and recovering fines without Court action. Such
agreements shall not allow an illegal structure or
use to continue unless there is clear and convincing
evidence that the illegal structure or use was
constructed or conducted as a direct result of
erroneous advice given by an authorized municipal
official and there is no evidence that the owner
acted in bad faith, or unless the removal of the
structure or use will result in a threat or hazard to
public
health
and
safety
or
will
result
in
substantial environmental damage.
(4) Fines. Any person, including but not limited to a
landowner, a landowner's agent or a contractor, who
violates
any
provision
or
requirement
of
this
Ordinance shall be penalized in accordance with 30-A,
M.R.S.A. section 4452.
NOTE:
Current penalties include fines of not less
than $100 nor more than $2500 per violation for
each day that the violation continues. However, in
61
a resource protection district the maximum penalty
is increased to $5000 (38 M.R.S.A. section 4452).
17.
Definitions.
Accessory structure or use - a use or structure which is
incidental and subordinate to the principal use or
structure. Accessory uses, when aggregated, shall not
subordinate the principal use of the lot. A deck or
similar extension of the principal structure or a garage
attached to the principal structure by a roof or a common
wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly
or indirectly affected by the granting or denial of a
permit or variance under this Ordinance; a person whose
land abuts land for which a permit or variance has been
granted; or any other person or group of persons who have
suffered particularized injury as a result of the granting
or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale
or lease, of plants and/or animals, including but not
limited to: forages and sod crops; grains and seed crops;
dairy animals and dairy products; poultry and poultry
products; livestock; fruits and vegetables; and ornamental
and green-house products. Agriculture does not include
forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable
freshwater, estuarine, or marine plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4
1/2 feet above ground level and inclusive of bark.
Basement - any portion of a structure with a floor-to-
ceiling height of 6 feet or more and having more than 50%
of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the
launching and landing of watercraft, and which may include
62
lA
an access ramp, docking area, and parking spaces for
vehicles and trailers.
Bureau - State of Maine Department of Conservation's
Bureau of Forestry
Campground - any area or tract of land to accommodate two
(2) or more parties in temporary living quarters,
including, but not limited to tents, recreational vehicles
or other shelters.
Canopy - the more or less continuous cover formed by tree
crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures,
other than a "home occupation," defined below, the intent
and result of which activity is the production of income
from the buying and selling of goods and/or services,
exclusive of rental of residential buildings and/or
dwelling units.
Cross-sectional area - the cross-sectional area of a stream
or tributary stream channel is determined by multiplying
the stream or tributary stream channel width by the
average stream or tributary stream channel depth. The
stream or tributary stream channel width is the straight
line distance from the normal high-water line on one side
of the channel to the normal high-water line on the
opposite side of the channel. The average stream or
tributary stream channel depth is the average of the
vertical distances from a straight line between the
normal high-water lines of the stream or tributary stream
channel to the bottom of the channel.
DBH - the diameter of a standing tree measured 4.5 feet
from ground level.
Development - a change in land use involving alteration of
the land, water or vegetation, or the addition or
alteration
of
structures
or
other
construction
not
naturally occurring.
Dimensional requirements - numerical standards relating to
63
spatial
relationships
including
but
not
limited
to
setback, lot area, shore frontage and height.
Disability
-
any
disability,
infirmity,
malformation,
disfigurement, congenital defect or mental condition
caused by bodily injury, accident, disease, birth defect,
environmental conditions or illness; and also includes the
physical or mental condition of a person which constitutes
a substantial handicap as determined by a physician or in
the case of mental handicap, by a psychiatrist or
psychologist, as well as any other health or sensory
impairment which requires special education, vocational
rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the
physical shape, properties, or condition of a shoreline
at
any
location
by
timber
harvesting
and
related
activities. A shoreline where shoreline integrity has
been disrupted is recognized by compacted, scarified
and/or rutted soil, an abnormal channel or shoreline
cross-section, and in the case of flowing waters, a
profile and character altered from natural conditions.
Driveway - a vehicular access-way less than five hundred
(500) feet in length serving two single-family dwellings
or one two-family dwelling, or less.
Emergency operations - operations conducted for the public
health, safety or general welfare, such as protection of
resources
from
immediate
destruction
or
loss,
law
enforcement, and operations to rescue human beings,
property and livestock from the threat of destruction or
injury.
Essential
services
-
gas,
electrical
or
communication
facilities;
steam,
fuel,
electric
power
or
water
transmission or distribution lines, towers and related
equipment; telephone cables or lines, poles and related
equipment; gas, oil, water, slurry or other similar
pipelines; municipal sewage lines, collection or supply
systems; and associated storage tanks. Such systems may
include towers, poles, wires, mains, drains, pipes,
conduits, cables, fire alarms and police call boxes,
traffic signals, hydrants and similar accessories, but
64
lA
shall not include service drops or buildings which are
necessary for the furnishing of such services.
Expansion of a structure - an increase in the floor area or
volume of a structure, including all extensions such as,
but not limited to: attached decks, garages, porches and
greenhouses.
Expansion of use - the addition of one or more months to a
use's operating season; or the use of more floor area or
ground area devoted to a particular use.
Family - one or more persons occupying a premises and
living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and
adjacent land areas that must be reserved in order to
discharge
the
100-year
flood
without
cumulatively
increasing the water surface elevation by more than one
foot in height.
Floor area - the sum of the horizontal areas of the floor(s)
of a structure enclosed by exterior walls, plus the
horizontal area of any unenclosed portions of a structure
such as porches and decks.
Forest management activities - timber cruising and other forest
resource evaluation activities, pesticide or fertilizer
application, management planning activities, timber stand
improvement, pruning, regeneration of forest stands, and
other similar or associated activities, exclusive of
timber harvesting and the construction, creation or
maintenance of roads.
Forested wetland - a freshwater wetland dominated by woody
vegetation that is six (6) meters tall (approximately
twenty (20) feet) or taller.
Forest Stand - a contiguous group of trees sufficiently
uniform in age class distribution, composition, and
structure, and growing on a site of sufficiently uniform
quality, to be a distinguishable unit.
65
Foundation - the supporting substructure of a building or
other
structure,
excluding
wooden
sills
and
post
supports, but including basements, slabs, frost walls, or
other base consisting of concrete, block, brick or
similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and
similar areas, other than forested wetlands, which are:
1.
Of ten or more contiguous acres; or of less than
10 contiguous acres and adjacent to a surface
water body, excluding any river, stream or brook,
such that in a natural state, the combined surface
area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water
at a frequency and for a duration sufficient to
support, and which under normal circumstances do
support,
a
prevalence
of
wetland
vegetation
typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or
inclusions of land that do not conform to the criteria of
this definition.
Functionally water-dependent uses - those uses that require, for
their primary purpose, location on submerged lands or
that require direct access to, or location in, inland
waters and that can not be located away from these
waters. The uses include, but are not limited to
commercial
and
recreational
fishing
and
boating
facilities,
excluding
recreational
boat
storage
buildings, finfish and shellfish processing, fish storage
and retail and wholesale fish marketing facilities,
waterfront dock and port facilities, shipyards and boat
building facilities, marinas, navigation aids, basins and
channels, retaining walls, industrial uses dependent upon
water-borne transportation or requiring large volumes of
cooling or processing water that can not reasonably be
located or operated at an inland site, and uses that
primarily provide general public access to inland
waters.
66
lA
Great pond - any inland body of water which in a natural
state has a surface area in excess of ten acres, and any
inland body of water artificially formed or increased
which has a surface area in excess of thirty (30) acres
except for the purposes of this Ordinance, where the
artificially formed or increased inland body of water is
completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA,
pursuant to 38 M.R.S.A. Article 4-A Section 465-A. This
classification includes some, but not all impoundments of
rivers that are defined as great ponds.
Ground cover - small plants, fallen leaves, needles and
twigs, and the partially decayed organic matter of the
forest floor.
Harvest Area - the area where timber harvesting and related
activities, including the cutting of trees, skidding,
yarding, and associated road construction take place.
The area affected by a harvest encompasses the area
within
the
outer
boundaries
of
these
activities,
excepting unharvested areas greater than 10 acres within
the area affected by a harvest.
Height of a structure - the vertical distance between the mean
original (prior to construction) grade at the downhill
side of the structure and the highest point of the
structure, excluding chimneys, steeples, antennas, and
similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is
customarily conducted on or in a residential structure or
property and which is 1) clearly incidental to and
compatible with the residential use of the property and
surrounding residential uses; and 2) which employs no
more than two (2) persons other than family members
residing in the home.
Increase in nonconformity of a structure - any change in a structure
or property which causes further deviation from the
dimensional standard(s) creating the nonconformity such
as, but not limited to, reduction in water body,
tributary stream or wetland setback distance, increase in
67
lot coverage, or increase in height of a structure.
Property changes or structure expansions which either
meet the dimensional standard or which cause no further
increase in the linear extent of nonconformance of the
existing structure shall not be considered to increase
nonconformity. For example, there is no increase in
nonconformity with the setback requirement for water
bodies, wetlands, or tributary streams if the expansion
extends no further into the required setback area than
does any portion of the existing nonconforming structure.
Hence, a structure may be expanded laterally provided
that the expansion extends no closer to the water body,
tributary stream, or wetland than the closest portion of
the existing structure from that water body, tributary
stream, or wetland. Included in this allowance are
expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not
associated with a campground, but which is developed for
repeated camping by only one group not to exceed ten (10)
individuals and which involves site improvements which
may include but not be limited to a gravel pad, parking
area, fire place, or tent platform.
Industrial
-
The
assembling,
fabrication,
finishing,
manufacturing, packaging or processing of goods, or the
extraction of minerals.
Institutional
-
a
non-profit
or
quasi-public
use,
or
institution such as a church, library, public or private
school, hospital, or municipally owned or operated
building, structure or land used for public purposes.
Land Management Road - a route or track consisting of a
bed of exposed mineral soil, gravel, or other surfacing
materials constructed for, or created by, the passage of
motorized
vehicles
and
used
primarily
for
timber
harvesting and related activities, including associated
log yards, but not including skid trails or skid roads.
Licensed Forester - a forester licensed under 32 M.R.S.A.
Chapter 76.
68
lA
Lot area - The area of land enclosed within the boundary
lines of a lot, minus land below the normal high-water
line of a water body or upland edge of a wetland and
areas beneath roads serving more than two lots.
Marina - a business establishment having frontage on
navigable water and, as its principal use, providing for
hire offshore moorings or docking facilities for boats,
and which may also provide accessory services such as
boat and related sales, boat repair and construction,
indoor and outdoor storage of boats and marine equipment,
bait and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in
the open market and under prevailing market conditions in
a sale between a willing seller and a willing buyer, both
conversant with the property and with prevailing general
price levels.
Mineral exploration - hand sampling, test boring, or other
methods of determining the nature or extent of mineral
resources which create minimal disturbance to the land
and which include reasonable measures to restore the land
to its original condition.
Mineral extraction - any operation within any twelve (12)
month period which removes more than one hundred (100)
cubic yards of soil, topsoil, loam, sand, gravel, clay,
rock, peat, or other like material from its natural
location and to transport the product removed, away from
the extraction site.
Minimum lot width - the closest distance between the side
lot lines of a lot. When only two lot lines extend into
the shoreland zone, both lot lines shall be considered to
be side lot lines.
Multi-unit residential - a residential structure containing
three (3) or more residential dwelling units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or
use which is allowed solely because it was in lawful
69
existence at the time this Ordinance or subsequent
amendment took effect.
Non-conforming lot - a single lot of record which, at the
effective
date
of
adoption
or
amendment
of
this
Ordinance, does not meet the area, frontage, or width
requirements of the district in which it is located.
Non-conforming structure - a structure which does not meet any
one or more of the following dimensional requirements;
setback, height, or lot coverage, but which is allowed
solely because it was in lawful existence at the time
this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises,
land or parts thereof which is not allowed in the
district in which it is situated, but which is allowed to
remain solely because it was in lawful existence at the
time this Ordinance or subsequent amendments took effect.
Normal high-water line - that line which is apparent from
visible markings, changes in the character of soils due
to
prolonged
action
of
the
water
or
changes
in
vegetation, and which distinguishes between predominantly
aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-
forested wetland vegetation and hydric soils and that are
at the same or lower elevation as the water level of the
river or great pond during the period of normal high-
water are considered part of the river or great pond.
Person - an individual, corporation, governmental agency,
municipality, trust, estate, partnership, association,
two or more individuals having a joint or common
interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or
beyond the normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water
for less than seven (7) months in any period
of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water
70
lA
for seven (7) months or more in any period of
twelve (12) consecutive months.
Principal structure - a building other than one which is used
for purposes wholly incidental or accessory to the use of
another building or use on the same premises.
Principal use - a use other than one which is wholly
incidental or accessory to another use on the same
premises.
Public facility - any facility, including, but not limited to,
buildings, property, recreation areas, and roads, which
are owned, leased, or otherwise operated, or funded by a
governmental body or public entity.
Recent floodplain soils - the following soil series as described
and identified by the National Cooperative Soil Survey:
Fryeburg Hadley
Limerick
Lovewell Medomak
Ondawa
Alluvial Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the
conduct of sports, leisure time activities, and other
customary and usual recreational activities, excluding
boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle
designed to be towed, and designed for temporary sleeping
or living quarters for one or more persons, and which may
include a pick-up camper, travel trailer, tent trailer,
camp trailer, and motor home. In order to be considered
as a vehicle and not as a structure, the unit must remain
with its tires on the ground, and must be registered with
the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an
existing system which is either malfunctioning or being
upgraded with no significant change of design flow or use
of
the
structure,
or
2.)
any
existing
overboard
wastewater discharge.
71
Residential dwelling unit - a room or group of rooms designed
and equipped exclusively for use as permanent, seasonal,
or temporary living quarters for only one family at a
time,
and
containing
cooking,
sleeping
and
toilet
facilities. The term shall include mobile homes and
rental units that contain cooking, sleeping, and toilet
facilities
regardless
of
the
time-period
rented.
Recreational vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees
remaining on a harvested site.
Riprap - rocks, irregularly shaped, and at least six (6)
inches in diameter, used for erosion control and soil
stabilization, typically used on ground slopes of two (2)
units horizontal to one (1) unit vertical or less.
Residual Stand - a stand of trees remaining in the forest
following timber harvesting and related activities
River - a free-flowing body of water including its
associated floodplain wetlands from that point at which
it provides drainage for a watershed of twenty five (25)
square miles to its mouth.
Road - a route or track consisting of a bed of exposed
mineral
soil,
gravel,
asphalt,
or
other
surfacing
material constructed for or created by the repeated
passage of motorized vehicles, excluding a driveway as
defined.
Service drop - any utility line extension which does not
cross or run beneath any portion of a water body provided
that:
1. in the case of electric service
a. the placement of wires and/or the installation of
utility poles is located entirely upon the premises
of the customer requesting service or upon a roadway
right-of-way; and
b. the total length of the extension is less than one
thousand (1,000) feet.
72
lA
2. in the case of telephone service
a. the extension, regardless of length, will be made by
the installation of telephone wires to existing
utility poles, or
b. the extension requiring the installation of new
utility poles or placement underground is less than
one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal
high-water line of a water body or tributary stream, or
upland edge of a wetland, to the nearest part of a
structure, road, parking space or other regulated object
or area.
Shore frontage - the length of a lot bordering on a water
body or wetland measured in a straight line between the
intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred
and fifty (250) feet, horizontal distance, of the normal
high-water line of any great pond; within 250 feet
horizontal distance, of the normal high-water line of
Sabattus River, or the 100 year floodplain, which ever is
greater; within 250 feet, horizontal distance, of the
normal high-water line of Curtis Brook, Maxwell Brook,
Fisher Brook and Barker Brook; within 250, horizontal
Distance, of the upland edge of a freshwater wetland; or
within seventy-five (75) feet, horizontal distance, of
the normal high-water line of a stream and as depicted on
the Official Shoreland Zoning Map.
Shoreline - the normal high-water line, or upland edge of a
wetland.
Skid Road or Skid Trail - a route repeatedly used by forwarding
machinery or animal to haul or drag forest products from
the stump to the yard or landing, the construction of
which requires minimal excavation.
Slash - the residue, e.g., treetops and branches, left on
the ground after a timber harvest.
73
Stream - a free-flowing body of water from the outlet of a
great pond or the confluence of two (2) perennial streams
as depicted on the most recent edition of a United States
Geological Survey 7.5 minute series topographic map, or
if not available, a 15-minute series topographic map, to
the point where the body of water becomes a river or
flows to another water body or wetland within the
shoreland area or as depicted on the Official Shoreland
Zoning Map.
Structure - anything built for the support, shelter or
enclosure of persons, animals, goods or property of any
kind, together with anything constructed or erected with
a fixed location on or in the ground, exclusive of
fences, and poles, wiring and other aerial equipment
normally associated with service drops as well as guying
and
guy
anchors.
The
term
includes
structures
temporarily or permanently located, such as decks,
patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a
permitted structure or use measured as a percentage of
estimated total cost.
Subsurface sewage disposal system - any system designed to
dispose of waste or waste water on or beneath the surface
of the earth; includes, but is not limited to: septic
tanks; disposal fields; grandfathered cesspools; holding
tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not
include any discharge system licensed under 38 M.R.S.A.
section 414, any surface waste water disposal system, or
any municipal or quasi-municipal sewer or waste water
treatment system.
Sustained slope - a change in elevation where the referenced
percent grade is substantially maintained or exceeded
throughout the measured area.
Timber harvesting - the cutting and removal of timber for the
primary purpose of selling or processing forest products.
The cutting or removal of trees in the shoreland zone on
a lot that has less than two (2) acres within the
74
lA
shoreland zone shall not be considered timber harvesting.
Such cutting or removal of trees shall be regulated
pursuant to Section 15 (P), Clearing or Removal of
Vegetation for Activities Other Than Timber Harvesting.
Timber harvesting and related activities - timber harvesting, the
construction and maintenance of roads used primarily for
timber harvesting and other activities conducted to
facilitate timber harvesting.
Tributary stream - means a channel between defined banks
created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by
the presence of a bed, devoid of topsoil, containing
waterborne deposits or exposed soil, parent material or
bedrock; and which is connected hydrologically with other
water bodies. "Tributary stream" does not include rills
or gullies forming because of accelerated erosion in
disturbed soils where the natural vegetation cover has
been removed by human activity.
This definition does not include the term "stream" as
defined elsewhere in this Ordinance, and only applies to
that portion of the tributary stream located within the
shoreland zone of the receiving water body or wetland.
Upland edge of a wetland - the boundary between upland and
wetland. For purposes of a freshwater wetland, the
upland edge is formed where the soils are not saturated
for a duration sufficient to support wetland vegetation;
or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody
stems that are six (6) meters (approximately twenty (20)
foot) tall or taller.
Vegetation - all live trees, shrubs, and other plants
including without limitation, trees both over and under 4
inches in diameter, measured at 4 1/2 feet above ground
level.
Volume of a structure - the volume of all portions of a
structure enclosed by roof and fixed exterior walls as
measured from the exterior faces of these walls and roof.
75
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the
opposite bank of a river, stream, tributary stream, or
wetland whether under, through, or over the water or
wetland. Such projects include but may not be limited to
roads, fords, bridges, culverts, water lines, sewer
lines, and cables as well as maintenance work on these
crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - a freshwater wetland.
Windfirm - the ability of a forest stand to withstand
strong winds and resist windthrow, wind rocking, and
major breakage.
Woody Vegetation - live trees or woody, non-herbaceous
shrubs.
76
lA