TOWN OF SABATTUS, MAINE
SITE PLAN REVIEW ORDINANCE
April 27, 2015
Ordinance Review Com :
David Gilbert: .
David Marsters: h Dep tome I) Whoiar,
Raymond Doyon: Koz nual BR Ap. eee
Jeffrey Baril:
Jan Paul Can ese cfel Ga --
William Lee:
l
Adopted May 14, 2015
TOWN OF SABATTUS, MAINE
SITE PLAN REVIEW ORDINANCE
Section 1. Purpose
Substantial development or major changes in the uses of land can cause a profound impact upon
the cost and efficiency of municipal services and upon the environment of the town,
The purposes of this ordinance are:
A. To provide municipal review of projects that potentially could affect the
environment and community;
.B. To promote and protect the health, welfare and safety of the residents of the
Town of Sabattus;
C. To provide local protection from those particular nuisances which are not
governed by State law or regulation;
D. To balance the rights of landowners to use their land with the corresponding
right of abutting and neighboring landowners to live without undue disturbance
from noise, smoke, fumes, dust, odor, glare, traffic, stormwater runoff or the
pollution of ground or surface waters;
E. Toreduce the off-site external problems created by developments thereby
decreasing the cost of maintaining or improving municipal services;
F. To conserve the Town's natural beauty and visual character by ensuring that
structures, signs and other improvements and uses of land are sited and
developed with due regard to the aesthetic qualities of the natural terrain and
that proper attention is given to exterior appearances of structures, signs, other
improvements and uses of land; and
G. To implement the policies of the comprehensive plan.
Section 2. Applicability
A. Site Plan Review by the Board or the Code Enforcement Officer, as the case may be, in
conformity with the criteria and standards of this section shall be required for the
following:
1. All development proposals for new, or substantial enlargements (an expansion by
either a 20% in new gross floor area or a 20% increase in new impervious surface
area provided such expansion involves at least 500 square feet within any five-year
period) of commercial, retail, industrial, institutional, public, and recreational
structure(s) or uses and their accessory uses and structures.
2
2 New uses of existing structures or land or existing uses that requires Site Plan Review
as defined in section 2.A.1 above when such uses would alter normal traffic patterns,
or which would employ new materials and/or processes.
3. Existing uses that require Site Plan Review as defined in section 2.A.1 which seek to
expand within any five (5) year period, with regard to floor space, seating capacity,
impervious surface area or outdoor storage area, unless the expansion is less than
30% and the Code Enforcement Officer makes written findings that (1) the new use
will comply with the review standards of Section 5, and (2) traffic volumes will not
increase from a low volume generator to a medium or high volume generator, or from
a medium generator to a high volume.
4. Resumption of uses which have been abandoned for at least five years which would
require review if being newly established.
». The initial placement of above or below ground storage tank(s) used for fuels,
hazardous substances or flammable and combustible liquids which contain 10,000
gallons or more in total or in combination.
6. Home Occupations when determined by the Code Enforcement Officer Site Plan
Review is required.
B. Site plan approval is not required by the Board for the following:
1. Construction of single family dwellings, two-family dwellings, and multi-family
dwellings and their accessory structures.
Z. Construction of barns, stables, and other agricultural related buildings by and for the
private use of families residing on or leasing/owning the property on which the
building is to be located.
3. All nonstructural uses of land for agricultural or forestry purposes.
4. Sand and gravel pits approved or established prior to the adoption of this ordinance
including the expansion of those pits approved or established on the same or adjacent
parcels.
5. Anew use of a structure and/or land area that has previously undergone Site Plan
Review and approval by the Board, when the Code Enforcement Officer makes
written findings that (1) the new use will comply with the standards in Section 5.A
and B. and (2) the structure or land area will not be enlarged beyond what is
permitted in Section 2.A.1.
6. Accessory structures to commercial, retail, industrial, institutional, public, and
recreational structure(s) and uses structures of greater than 500 square feet in total floor
area shall require review and approval of compatibility by the Code Enforcement Officer,
Before making a determination of compatibility the Code Enforcement Officer shall make a
positive written finding that the proposed accessory structure meets the criteria contained in
Section 5.A.1, 5.4.2, 5.4.5, 5.A.15 and 5.A.16.
3
7. Home occupations which meet the following conditions do not need Site Plan
approval but require a permit issued by the Code Enforcement Officer.
a. The home occupation is incidental and secondary to the primary residential use
of the premises;
b. Do not employ persons who do not make the residence their permanent home;
c. Do not display any exterior sign larger than eight (8) square feet, any exterior
indications of the home occupation or variation from the residential character of
the principal dwelling or accessory structure.
d. Do not generate any nuisance, waste discharge, offensive noise, vibration,
smoke, dust, odors, heat, glare, radiation, fumes, or electrical interference
detectable to the normal senses or which interferes with normal radio or
television reception, or causes other nuisances which extend beyond the limits
of the subject property; and
e. Are not likely to generate regular daily or seasonal traffic not associated with
Section 3. Authority, Administration
A. Authority
1. This Ordinance is adopted pursuant to Home Rules Powers as provided for in Article
VIII-A of the Maine Constitution and Title 30-A M.R-S.A. Section 3001.
2. This Ordinance shall be known as the "Site Plan Review Ordinance" of the Town of
Sabattus, Maine.
B. Administration
1. This Ordinance shall be administered by the Code Enforcement Officer and the Planning
Board for the Town of Sabattus, Maine, hereafter referred to as the Board.
2. No activity requiring a Site Plan Review approval, or a building permit, plumbing
permit or certificate of occupancy for any use or development within the scope of
this Ordinance shall be issued until a Site Plan of Development application has been
review and approved by the Board or Code Enforcement officer, as the case may be.
C. Effective Date
The effective date of this Ordinance is affective at adoption of this Ordinance at Town
Meeting.
D. Repeal of Existing Site Plan Review Ordinance
Adoption of this Ordinance shall repeal any and all previous adopted Site Plan Review
Ordinances. This shal! not prevent the enforcement of the repeal ordinances with respect
to the time periods in which they were in effect.
4
E, Joint Reviews and Approvals
When an application requires review and approval pursuant to this Ordinance and the
Town of Sabattus Groundwater and Wellhead Protection Ordinance the Board shall
conduct such reviews simultaneously in accordance with the procedures of this Ordinance.
Plans shall conform to the provisions of this Ordinance as well as that required by the
Town of Sabattus Groundwater and Wellhead Protection Ordinance
Section 4. Site Plan Content - Application Procedures and Requirements.
A. Agenda. In order to avoid unnecessary delays in processing applications, the Board shall
prepare an agenda for each regularly scheduled meeting. Applicants shall
request to be placed on the Board's agenda at least ten (10) days in advance of a
regularly scheduled meeting by contacting the Board staff (Code Enforcement
Officer). Applicants who attend a meeting but who are not on the agenda may
be heard but only after all agenda items have been completed and then only ifa
majority of the Board so votes.
B. Preapplication Meeting. Applicants shall schedule a meeting with the Board prior to
formal submission, to present a sketch plan and make a verbal presentation
regarding the site and the proposed project.
I, Submission. The Preapplication Sketch Plan shall show, in simple sketch
form, the proposed development area, and other features in relation to
existing conditions. The Sketch Plan, which may be a free-hand penciled
sketch, should be supplemented with general information to describe or
outline the existing conditions of the site and the proposed development.
It is recommended that the sketch plan be superimposed on or
accompanied by a copy of the Assessor's Map(s) on which the land is
located.
2. Contour Interval and On-Site Inspection. Within 30 days of the pre-
application meeting, the Board shall determine and inform the applicant,
in writing, of the required contour interval on the development plan and
conduct an on-site inspection of the property.
3. Ownership Interest. The applicant will furnish written evidence showing
his right, title or interest (option, contract for sale, etc.) in the property to
be developed to the Board.
C. Application Procedure
1. Applications in Writing. All applications for site plan approval ghall be
made in writing on forms provided for this purpose. Applications shall be
received by the Board in order, filed and when the Board agenda permits.
All applications shall be made by the owner in the property or his agent, as
designated in writing or person which shows evidence of right, title or
interest.
5
2. Develepment Plan. A Development Plan meeting the standards of
Section 4.H shall be submitted to and reviewed by the Board and shall be
approved by the Board before any building permit may be issued. In the
case of proposed resumptions of uses which have been abandoned for at
least five years, Board approval shall be required before such uses may be
resumed if such a use requires review if being newly established.
3. Notice to Abutters. Upon filing an application, property owners within
100 feet of the edge of the applicant's property lines including those
across the street shall be notified by certified mail, Return Receipt
Requested, by the Applicant, of a pending application for Site Plan
Review. This notice shall indicate the time, date and place of the
Board's first consideration of the application.
4. The applicant, or his duly authorized representative, shall attend the
meeting of the Board to discuss the Development Plan. The Board shall
provide the applicant a dated receipt of a Site Plan Review application at
the Board meeting where the application is first presented.
5. The Board shall hold a public hearing on each application at the first
meeting the application is presented and shall publish notice of the date,
time and place of the hearing in a newspaper of general circulation in the
municipality at least two times, the date of the first publication to be at
least 7 days prior to the hearing. Notice of the public hearing shall be
mailed to all abutters of the proposed development at least 7 days prior to
the hearing by the Town of Sabattus.
6. Within 30 days of receipt of a Site Plan Review application form and fee,
the Board shall notify the applicant in writing whether or not the
application is complete, and what, if any, additional submissions are
required for a complete application. The Board may request the applicant
to provide additional information necessary for the Board review after a
determination that a complete application has been received.
7. Additional Studies. The Board may require the applicant to under-take
any study which it deems reasonable and necessary to demonstrate that the
requirements of the Ordinance are met. The costs of all such studies shall
be borne by the applicant.
8. Financial Guarantee. Prior to final approval or any Site Pian Review
application, the Board may require the posting of a bond, escrow
agreement or letter of credit in such amount as is approved by the Board.
This amount shall be sufficient to ensure completion of all improvements
required as conditions of approval of such plan in such form as approved
by the Board and Town Selectmen. The Town shall have access to the site
at all times to review the progress of the work.
9. Conditions. The Board may attach reasonable conditions to the Site Plan
Review approvals to ensure conformity with the standards and criteria of
this Ordinance.
6
10. Within 30 days after the record is closed of a public hearing, or within
another time limit as may be otherwise mutually agreed to by the Board
and the applicant, the Board shall issue an order and approve, approve
with conditions, or deny the development plan. The Board shail specify,
in writing, its findings of facts and reasons for any conditions or denial.
11. Prior to issuance of a Building Permit by the Code Enforcement Officer of
any project which has received Site Plan Review approval, the applicant
shall provide proof to the Code Enforcement Officer that all necessary
permits required by the Access Management Law, Natural Resource
Protection Act, Site Location of Development Act, Maine Stormwater
Management Law and Section 404 of the Federal Water Pollution Control
Act have been obtained. Such proof of permits shall be placed in the
application record.
12, Approvals of site plans are dependent upon and limited to the proposals
and plans contained in the application and supporting documents
submitted and affirmed by the applicant. Any variation from the plans,
proposals and supporting documents, except minor changes as permitted
in 4.F below, is subject te review and approval by the Board.
D. Code Enforcement Officer Site Plan Review Approval
1. The Code Enforcement Officer shall review and approve, approve with
conditions or deny all applications for site plan approval as set forth in
Sections 2.A. 3 and 2.B.5 and 6. The Code Enforcement Officer may refer
any application submitted under this Section to the Board if the Code
Enforcement Officer finds that the application is more complex than his/her
expertise to review or ifthe Code Enforcement Officer finds that the
public has a significant interest in the development and should be afforded
the opportunity for formal input.
2. The Code Enforcement Officer shall utilize the following procedures for
Code Enforcement Officer review of Site Plan Review Applications.
a. An applicant for a Code Enforcement Officer Site Plan Review approval
Shall submit two (2) copies of a fully executed and signed copy of the
Application for Site Plan Review and the application information contained
in section 5.H to the Code Enforcement Officer. The applicant shall pay to
the Town Treasurer an application fee. Said fee shall be non-refundable
and shall be computed as specified in the Schedule of Licenses, Permit and
Application Fees established and amended from time to time by vote of the
Town of Sabattus Board of Selectmen. The Code Enforcement Officer shall
issue the applicant a dated receipt.
b. Upon receipt of the application the Code Enforcement Officer shall
notify, by regular first-class mail, abutting property owners of a pending
application, where and when it can be reviewed and the time period that
comment will be accepted.
7
c. Within ten (10) days from the receipt of an application, the Code
Enforcement Officer may schedule an on-site inspection of the property
that shall be jointly attended by the applicant or a duly authorized
representative and the Code Enforcement Officer.
d. Within fifteen (15) days from the receipt of an application, the Code
Enforcement Officer shall notify the applicant in writing either that the
application is complete, or if it is incomplete, the specific information that
need to be addressed to make a complete site plan application.
e. Upon receipt of additional information and determination that a complete
application has been submitted for review, The Code Enforcement Officer
shall issue a dated notice to the applicant.
f. Within thirty (30) days of the receipt of a complete application, or within
another time limit as may be otherwise mutually agreed to by the Code
Enforcement Officer and the applicant, The Code Enforcement Officer
after considering the applicable criteria and standards shall approve,
approve with conditions or deny the application and issue a written
decision and findings of fact to the applicant.
KE. Expiration of Approvals
Failure to commence a substantial start of the development within two years of the date of
approval shall render the Site Plan approval void. A statement of this effect must appear in
the approval findings of facts. A new application must be made and approved subject to all
ordinances then in effect. Upon good cause shown, the Board or the Code Enforcement
officer, as the case may be, may extend the approval for an additional two year period. The
extension request must be made to the Board at least thirty days prior to the time of
expiration. Upon determining that a site plan approval has expired under this paragraph, the
Board shall have a notice placed in the Registry of Deeds to that effect.
F. Minor Changes to Approved Plans.
Minor changes in approved plans necessary to address field conditions or structure
orientation may be authorized by the Code Enforcement Officer provided that any such
change does not affect the standards of this Ordinance or alter the intent of the approval. A
request for 2 minor change to an approved plan shall be in writing to the Code Enforcement
Officer. In making the determination to approve a minor change to an approved plan the
Code Enforcement Officer shall consult with the Board Chair or the Chair's designee. All
approvals for minor changes to approved plans shall be in writing by the Code
Enforcement Officer. A copy of the written approval and revised site plan shall be filed
with the Board within thirty (30) days from the date of the written approval.
G. Inspections and Site Conditions.
1. The Board or Code Enforcement Officer may require the applicant to pay for
professional oversight or inspections during construction of site or building
improvements proposed under this ordinance. If required, at least five (5) days
prior to commencing construction, the applicant shall:
&
a. Notify the Code Enforcement Officer in writing of the time when the
applicant proposes to commence construction so that the municipal
officers can arrange for inspection to be made. The inspecting official
shall assure that all municipal specifications, requirements and conditions
of approval shall be met during the construction and shall assure the
satisfactory completions of improvements required by the Board or Code
Enforcement Officer.
b. Deposit with the municipal officers, a check for the amount of 2% of the
estimated costs of construction and improvements to pay for the costs of
inspection. If upon satisfactory completion of construction and cleanup
there are funds remaining, the surplus funds shall be refunded to the
applicant within 30 days. If the inspection account shall be drawn down
by 90%, the applicant shall deposit an additional 1% of the estimated costs
of construction and improvements.
2. During construction, the site shall be maintained and left each day in a safe and
sanitary manner. Site area shall be regularly sprayed with an environmentally
safe product to control dust from construction activity.
3. Developed areas shall be cleared of all stumps, litter, rubbish, brush, weeds,
dead and dying trees, roots and debris, and excess or scrap building materials
shall be removed or destroyed immediately upon the request and to the
satisfaction of the Code Enforcement Officer prior to issuing an occupancy
permit.
4. Changes in elevation. No significant change shall be made in the elevation ot
contour of any lot or site by the removal of earth to another lot or site other than
as shown on an approved Site Review Plan. Any non-permitted removal of
greater than 1,000 cubic yards in a 12-month period must be approved by the
Board in according to Section 5. B.
H. Site Plan Review Application Requirements
Applications for Site Plan Review shall be submitted on application forms provided
by the Town. The completed application form, the required plans, related
information and fees shall be submitted to the Board staff (Code Enforcement
Officer) by the first of the month that the Planning Board shall consider the
application. Twelve copies of the plan(s) and all accompanying information shall be
submitted. The Board can request that the Fire Chief, Police Chief, Road
Commissioner and Sabattus Sanitary District and Water Division provide the Board
with official comments upon the adequacy of their department's existing capacity to
service the proposed development.
The submission shall contain at least the following exhibits and information:
1. The Development Plan shall consist of one or more reproducible, stable base
transparent original, to be filed at the Town Office, drawn at a scale of not
smaller than 50 feet to the inch or other scale as determined by the Board.
Space shall be provided on the Development Plan for the signatures of the
9
Board and date with the following words. Approved: Town of Sabattus
Planning Board
2. A fully executed and signed copy of the application for Site Plan Review.
3. General information:
a, Name of owner(s) of record and address and applicant's name and address,
if different;
b. The name of the proposed development;
c. Names and addresses of all property owners within 100 feet of the edge of
the property line including those across the street;
d. Sketch map showing general location of the site within the Town;
e. Boundaries of all contiguous property under the control of the owner or
applicant regardless of whether all or part is being developed at this time;
f. The tax map and lot number of the parcel or parcels;
g. Acopy of the deed to the property, option to purchase the property or
other documentation to demonstrate right, title or interest in the property
on the part of the applicant; and
h. The name, registration number and seal of the licensed professional
surveyor, architect, engineer and/or person who prepared the plan.
4, Every application shall be accompanied by the written certificate of the Town's
Code Enforcement Officer that the applicant is not in violation of any Town
Ordinance regulating land use. No application shall be considered complete,
nor shall any application be in order for review or approval, unless accompanied
by this written certificate. The Board shall not waive this requirement.
5. Existing Conditions
a. Zoning classification(s) of the property including Aquifer Protection
District Zone(s) and the location of district boundaries if the property is
located in two or more districts or abuts a different district;
b. The bearings and distances of all property lines of the property to be
developed and the source of this information. The Board may require a
formal boundary survey when sufficient information is not available to
establish, on the ground, all property boundaries;
c. Location and size of any existing sewer and water mains, culverts and
drains on the property to be developed and of any that will serve the
development from abutting streets or land;
d. Location, names and present widths of existing streets and rights-of-way
within or adjacent to the proposed development;
10
¢. The location, dimensions and ground floor elevations of all existing
buildings on the site;
f. The location and dimensions of existing driveways, streets and parking
and loading areas and walkways on the site;
8. Location of intersecting roads or driveways within 200 feet of the site;
h. The location of open drainage courses, wetlands, known or potential
archaeological resource, historic buildings and sites, mapped sand and
gravel aquifers, known rare and endangered, other critical natural
features/resources with a description of how such features will be
maintained or impacts upon them minimized;
i. The location of significant or rare plant and wildlife habitats, including
fisheries, deer wintering areas and waterfowl and wading bird habitats
identified on the Beginning with Habitat Maps published by the Maine
Department of Inland Fisheries and Wildlife. If there are significant or
rare plant and wildlife habitats, including fisheries, deer wintering areas
and waterfowl and wading bird habitats identified the applicant shall
consult with the Maine Department of Inland Fisheries and Wildlife on
measures to conserve the identified habitat.
j. The direction of existing surface water drainage across the site, if existing
condition contours are not provided;
k. If any portion of the property is in the 100-year floodplain, its elevation
shall be delineated on the plan;
1. The location and dimensions of existing and proposed signs; and
m. Location and dimensions of any existing easements and copies of existing
covenants or deed restrictions.
6. Proposed Development Activity
a. The location, dimensions, design and exterior materials of all proposed
buildings and structures.
b. All existing and proposed setback dimensions.
¢. The size, location and direction and intensity of illumination and method
of installation of all major outdoor lighting apparatus,
d. The type, size and location of all incineration devices.
e. The type, size and location of all machinery likely to generate appreciable
noise at the lot lines.
ii
f. Type of sewage disposal. ,
i. Ifsubsurface waste water disposal is to be used an on-site soils
investigation report by a Maine Department of Human Services
licensed Site Evaluator. The report shail identify the types of soil,
location of test pits, and proposed location and design for the
subsurface waste water disposal system.
ii. If public sewer are to be used, a statement from the Sabattus Sanitary
District as to its capacity to serve the development.
g. The type and location of water supply to be used.
i. If on site water supply is to be used evidence of adequate ground
water supply and quality shall be submitted by a well driller or a
hydro geologist familiar with the area.
ii. If public water is to be used, a statement from the Sabattus Sanitary
District (Water Division) as to its capacity to serve the development.
h. The amount and type of any raw, finished or waste materials to be stored
outside of roofed buildings including their physical and chemical
properties, if appropriate.
i. All existing contours and proposed finished grade elevations of the entire
site and the system of drainage proposed to be constructed. Contour
intervals shall be specified by the Board.
J. The location, type and size of all curbs, sidewalks, driveways, fences,
retaining walls, parking space areas, and the layouts thereof, together with
their dimensions.
k. Landscape plan indicating all landscaped areas, fencing and size and type
of plant material proposed to be retained or planted with special emphasis
placed on front setback areas.
1, _ All existing or proposed rights-of-way, easements and other legal
restrictions which may affect the premises in question.
m. The property lines of all properties abutting the proposed development,
including those properties across the street, with the names and addresses
of the owners as disclosed on the tax maps on file in the Town Office as of
the date of the development plan review application.
n. Traffic Data: Traffic data shali include the following:
1) The estimated peak-hour traffic to be generated by the proposal.
2) Existing traffic counts and volumes on surrounding roads.
12
3) Traffic accident data covering the most recent three-year period for
which such data is available.
4) The capacity of surrounding roads and any improvements which may
be necessary on such roads to accommodate anticipated traffic
generation.
5) The need for traffic signals and signs or other directional markers to
regulate anticipated traffic.
o. A copy of the approved Driveway or Entrance penmit issued by
the Maine Department of Transportation if a driveway or
entrance will enter onto Route 9, Route 132, Route 126, Route
197, Bowdoinham Road, or Crowley Road.
p. A stormwater management plan showing:
1} The existing and proposed method of handling storm water run-off.
2) The direction of flow of the run-off through the use of arrows, if
proposed contours are not provided.
3) The location, elevation and size of all catch basins, dry wells,
drainage ditches, swales, retention basins and storm sewers.
4) Engineering calculations used to determine drainage requirements
based upon the 2-, 10- and 25-year, 24-hour storm frequency, if the
project will significantly alter the existing drainage pattern due to
such factors as the amount of new impervious surfaces (such as
paving and building area) being proposed.
5) If applicable documentation that the development will comply with
the Sabattus Non-Storm Water Discharge Ordinance.
6) If applicable a Post-Construction Stormwater Management Plan
meeting the standards of the Post-Construction Stormwater
Management Ordinance.
q- Asoil erosion and sediment control plan for construction and for
permanent control.
1. If located in the direct watershed of a great pond, a phosphorous control
plan prepared in accordance with Section 5.4.15
s. A ground water impact analysis prepared by ground water hydrologist for
projects involving shared on-site water supply or sewage disposal facilities
with a capacity of 2,000 gallons or more per day.
t. A utility plan showing, in addition to provisions for water supply and
waste water disposal, the location and nature of electrical, telephone and
any other utility services to be installed on the site,
13
u. The location, width, typical cross-section, grades and profiles of any
proposed streets and sidewalks.
v. Construction drawings for streets, sanitary sewers, water and storm
drainage systems, designed and prepared by a licensed professional
engineer registered in the State of Maine.
w. Cost of the proposed development and evidence of financial capacity to
complete it. This evidence should be in the form of a letter from a bank or
other source of financing indicating the name of the project, amount of
financing proposed, and interest in financing the project.
x. A municipal service impact analysis that includes a list of construction and
maintenance items, with both capital and annual operating cost estimates, that
must be financed by the Town of Sabattus or quasi-municipal districts. This list
shall include but not be limited to: schools including busing; street
reconstruction, maintenance, and snow removal; solid waste disposal; sewage
treatment; water; and fire protection. The applicant shall provide an estimate of
the net increase in taxable assessed valuation upon build out of the subdivision.
7. Submission Waivers. Where the Board or the Code Enforcement Officer, as the
case may be, makes written findings of fact that there are special circumstances
of a particular application, it may waive portions of the submission
requirements, unless otherwise indicated in this Ordinance, provided that the
applicant has demonstrated that the standards of this Ordinance have been or
will be met, the public health, safety and welfare are protected, and provided the
waivers do not have the effect of nullifying the intent and purpose of the
Comprehensive Plan and this Ordinance.
8. Fees. The following fee(s) shall be paid at the time of application submission:
a. The applicant shall pay to the Town Treasurer an application fee. Said fee
shall be non-refundable and shall be computed as specified in the Schedule of
Licenses, Permit and Application Fees established and amended from time to
time by vote of the Town of Sabattus Board of Selectmen.
b. The applicant shall pay to the Town Treasurer a Review Escrow Fee. Said fee
shall be computed as specified in the Schedule of Licenses, Permit and
Application Fees established and amended from time to time by vote of the
Town of Sabattus Board of Selectmen. The monies shall be deposited in an
escrow account established by the Town, which monies may be used by the
Board to pay for professional reviews and advice related to the developer's
application as it deems necessary. The Board shall provide the applicant with
notice of its intent to spend any portion of this account which notice shail
specify the purpose for the proposed expenditures. If the balance in the
Review Escrow Account shall be drawn down by 75%, the Board shall
require that an additional 50% of the original review escrow account fee be
deposited by the applicant as necessary whenever the balance of the account is
drawn down to 75% of the original deposit.. Those monies deposited by the
14
applicant in the review escrow account and not spent by the Board in the
course of its review shall be returned to the applicant within thirty (30) days
after the Board renders its final decision on the application.
Section 5. Review Standards.
A. General Review Standards
The following criteria and standards shall be utilized by the Board or Code
Enforcement Officer, as the case may be, in reviewing applications for Site Plan
Review approval. The standards are not intended to discourage creativity, invention
and innovation. The Board or Code Enforcement Officer, as the case may be, shall
approve the Development Plan unless the Board or Code Enforcement Officer, as the
case may be, finds that the applicant has not satisfied one or more of the following
criteria provided that the criteria were not first waived by the Board or Code
Enforcement Officer, as the case may be, in accordance with Subsection 5. C.
1. Preservation of Landscape. The landscape will be preserved in its natural state,
insofar as practical, by minimizing tree and soil removal, retaining existing vegetation
where desirable, and keeping any grade changes in character with the general
appearance of neighboring areas.
After construction is completed, landscaping shall be designed and planted that will
define, soften or screen the appearance of off-street parking areas from the public
right-of-way and abutting properties and/or structures in order to enhance the physical
design of the building(s) or site, and to minimize the encroachment of the proposed
use on neighboring land uses.
Environmentally sensitive areas which include wetlands, significant wildlife habitat
areas of two or more contiguous acres with sustained slopes greater than 20 percent,
unique natural features and archaeological sites as identified in the Town of Sabattus
Comprehensive Plan shall be conserved to the maximum extent.
In making findings of this standard the Board shall consider the information provided
on the Beginning with Habitat Maps published by the Maine Department of Inland
Fisheries and Wildlife and maps and information provided by the Maine Historic
Preservation Commission.
2. Relation of Proposed Structures to Environment, Proposed structures should be
related harmoniously to the terrain and to existing buildings in the vicinity that have a
visual relationship to the proposed structures so as to have a minimally adverse affect
on the environmental and aesthetic qualities of the developed and neighboring areas.
The Board shall consider the following criteria.
a. Architectural style is not restricted but will reflect traditional New
England building forms. Evaluation of the appearance of a project is to be
based on the quality of its design and relationship to surroundings.
1S
b. Buildings will have good scale and be in harmonious conformance with
permanent neighboring development.
c. Exterior building materials will be of aesthetic quality on all sides.
Building materials such as glass, brick, tinted and decorative concrete
block, wood, stucco and exterior insulation and finish systems (EIFS) will
be used. Decorative architectural metal or decorative tilt-up panels may be
approved if incorporated into the overall design of the structure.
d. Building components, such as windows, doors and eaves, will have good
proportions and relationships to one another.
e. Structure facade colors shall be non- reflective subtle, neural or earth tone.
The use of high intensity colors, metallic colors, fluorescent colors or
black on the facade shall not be used. Structure trim and architectural
accent elements may feature bright colors or black, but such colors shall
be muted, not metallic or fluorescent.
f. Mechanical equipment or other utility hardware on roof, ground or
structures shall be screened from public view with materials harmonious
with the building, or they shall be located so visibility from any public
way is minimized.
g.. Exterior lighting shall be part of the architectural concept. Fixtures, light
poles and all exposed accessories shall be harmonious with building
design.
h, Monotony of design in single or multiple building projects shall be
avoided. Variation of detail, form and sitting shall be used to provide
visual interest. In multiple building projects, viable sitting or individual
buildings may be used to prevent a monotonous appearance.
3. Signs: All signs shall comply with standards set forth within the Sabattus Sign
Ordinance,
4. Special Features. Exposed storage areas, exposed machinery installations,
service areas, truck loading areas, utility buildings and structures, and similar
accessory areas and structures, shall be subject to such setbacks, plantings or
other screening methods as shall reasonably be required to prevent their being
incompatible with the existing or contemplated environment and the
surrounding properties.
5. Exterior Lighting, All exterior lighting shall be designed to encourage energy
efficiency, to ensure safe movement of people and vehicles, and to minimize
adverse impact on neighboring properties and public ways. Adverse impact is
to be judged in terms of hazards to people and vehicle traffic and potential
damage to the value of adjacent properties. Lighting shall be arranged to
minimize glare and reflection on adjacent properties and the traveling public.
I6
6. Buffer Areas. No industrial or commercial buildings or uses shall be established
in, or adjacent to, a residential use, or an existing agricultural use unless a
landscaped buffer strip is provided to create a visual screen between the uses.
Where no natural vegetation can be maintained or due to varying site
conditions, the landscaping screen may consist of fences, walls, tree plantings,
hedges or combinations thereof. The buffering shall be sufficient to minimize
the impacts of any kind of potential use such as: loading and unloading
operations, outdoor storage areas, vehicle parking, mineral extraction, waste
collection and disposal areas, Where a potential safety hazard to small children
would exist, physical screening or barriers shall be used to deter entry to such
premises. The buffer areas shall be maintained and vegetation replaced to
insure continuous year-round screening.
7. Vehicular Access:
The proposed development shall provide safe vehicular access to and from
public and private streets. When conflicts exist between this section and a
Driveway Permit or Entrance Permit onto Route 9, Route 132, Route 126, Route
197, Bowdoinham Rd or Crowley Road, issued by the Maine Department of
Transportation, the most stringent or restrictive shall apply. The applicant for a
development to be located on a parcel of land of ten (10) acres or greater or five
hundred (500) feet or more of frontage on a public street shall file a conceptual
Access Master Plan with the Board, The conceptual Access Master Plan shall
address the overall use of the parcel, the overall vehicular circulation system
within the parcel, and the coordination of access into and out of the site. The
conceptual Access Master Plan shal! demonstrate how the requirements for
access as contained in this section will be met.
After the conceptual master plan has been filed with the Board, any application
for approval shall be consistent with the plan unless a revised plan is filed.
a. Vehicular access to the site shall be on roads which have adequate
capacity to accommodate the additional traffic generated by the
development. Intersections on major access routes to the site within one
half (1/2) mile of any entrance road which are functioning at a Level of
Service of C or better prior to the development must function at a
minimum Level of Service C after development. If any intersection is
functioning at a Level of Service D or lower prior to the development, the
project must not reduce the current level of service.
The geometrics of intersections that will serve the proposed development
shall be of such design to provide for safe turning movements.
The Board may approve a development not meeting these requirements if
the applicant demonstrates improvements will be consistent with the
Maine Department of Transportation Highway Design Guide, January
1994 Revision, and as may be revised and that:
1) A public agency has committed funds to construct the improvements
necessary to bring the level of access to this standard, or
i7
2) The applicant shall assume financial responsibility for the
improvements necessary to bring the level of service to this standard
and will guarantee the completion of the improvements within one
(1} year of approval of the project.
b. Any exit driveway or driveway Jane shall be so designed in profile and
grading and so located as to provide the following minimum sight distance
measured in each direction. The measurements shall be from the driver's
seat of a vehicle standing on that portion of the exit driveway from
distances between 10 and 15 feet behind the curbline or edge of shoulder,
with the height of the eye 3.5 feet to the top of an object 4.25 feet above
the pavement.
Posted Speed Limit Sight Distance Sight Distance
(Standard Vehicle) (Larger Vehicle)
25 mph 200' 300'
30 mph 250! 375"
35 mph 305' 455'
40 mph 360' 540'
45 mph 425' 635'
50 mph 495' 740!
55 mph 570' 855'
If more than 30% of the traffic projected to use the entrance will be larger
vehicles the sight distances shown in the right hand column apply. Height
of the eye should be six (6) feet with height of object no more than 4.25
feet above the pavement.
c. | Where more than one business or structure is located on a single parcel, all
vehicular access to and from a public or private road shall be via a
common access or entrance way(s) serving all business and structures
except as provided for herein.
d. The grade of any exit driveway or proposed street for a distance of fifty
(50) feet from its intersection with any existing street shall be a maximum
of three (3) percent.
e. The intersection of any access drive or proposed street must function at a
Level of Service of C following development if the project will generate
400 or more vehicle trips per 24-hour period or a level which will allow
safe access into and out of the project if less than 400 irips are generated.
f. Projects generating 400 or more vehicle trips per 24-hour period must
provide two or more separate points of vehicular access into and out of the
site.
g. Where a proposed development is to be located at the intersection of
Route 9, 126, 132 or 197 and a minor or collector road, entrance(s) to and
exit(s) from the site shall be located only on the minor or collector road
provided that this requirement may be waived where the applicant
demonstrates that existing site conditions preclude the location of a
18
driveway on the minor or collector road, or that the location of the
driveway on the minor or collector road would interfere with a
predominately residential neighborhood. In addition, this requirement
may be waived when an analysis conducted by a traffic engineer, retained
by the Board, finds that the operation or safety at an intersection of Route
9, 126, 132 or 197 and a minor or collector road would be improved with
an entrance or exit from or onto Route 9, 126, 132 or 197. Any such
entrance or exit shall be a restricted entrance or exit point to supplement
the primary entrance and exit from the minor or collector road. The
entrance or exit will maintain traffic carrying functions and minimize
congestion and crash potential.
h. Curb cuts or access points shall be limited to one per lot for all lots with
less than 200 linear feet or less of road frontage. For lots with greater than
200 feet of frontage, a maximum of one curb cut per 200 feet of frontage
shall be permitted to a maximum of three, provided the Board makes a
finding that (a) the driveway design relative to the site characteristics and
site design provides safe entrance and exit to the site and (b) no other
practical alternative exists.
i. The maximum number of curbcuts to a particular site shall be governed by
the following:
1) No low volume traffic generator shall have more than one two-way
access onto a single roadway.
2) No medium or high volume traffic generator shall have more than
two two-way accesses or three accesses in total onto a single
roadway.
j. Curb cut widths and design shall conform to the following standards:
1) Low volume driveways: Defined as driveways with less than 50
vehicle trips/day based on the latest edition of the Institute of Traffic
Engineers' Trip Generation Report, as the same may be amended
from time to time shall:
a) have two-way operation;
b) intersect the road at an angle as close to 90 degrees as site
conditions permit, but at no less than 60 degrees;
c) notrequire a median;
d) slope from the gutter line on a straight slope of 3 percent or
less for at least 50 feet, with a slope no greater than 8 percent
except where unique site conditions permit a waiving of the
slope standard to 10 percent; and
e) comply with the following geometric standards:
NOTE: The Board may vary these standards due to unique factors
such as a significant level of truck traffic.
19
Item Desired Minimum Maximum
Value (ft} Value (ft.) Value (ft.)
"Lipper values where major street speed and/or volume is high.
Low Volume Driveway
R o | R
| +
| Ww
|
2) Median volume driveways with more than 50 vehicle trips/day but
fewer than 200 peak hour vehicle trips, based on the latest edition of
the Institute of Traffic Engineers' Trip Generation Report, as the
same may be amended from time to time, and generally including all
land uses not in the low or high volume groups, shall:
a) have either two-way or one-way operation;
b) intersect the road at an angle as close to 90 degrees as site
conditions permit, but at no less than 60 degrees;
c) not require a median;
d) slope upward from the gutter line on a straight slope of 3
percent or less for at least 50 feet and a slope of no more than 6
percent thereafter, with the preferred grade being a 4 1/2
percent, depending on the site; and
e) comply with the following geometric standards:
NOTE: The Board may vary these standards due to unique factors
such as a significant level of truck traffic,
Item Desired Minimum Maximum
Value (ft } Value (ft.) Value (it )
es eC
20
ONF WAY
R1 (radius) 30 25 40
R2 (radius) 5 5 10
W (drive width) 20) 20 24
TWO WAY
R {radius} 30 25 40
WD 26-36* 24 30-40*
* Where separate left and right exit lanes are desirable.
Median Volume (One Viay) Median Volume Driveway (Two Way)
R, ' 1 R, * ; R, R . ; | _ R
w Wi lw,
3) High volume driveways defined as driveways with more than 200
peak hour vehicle trips shall:
a) have two-way operations separated by a raised median of 6 to
10 feet in width and a 50 to 100 feet length depending upon
necessary storage length for queued vehicles;
b) Intersect with the road at an angle as close to 90 degrees as
possible, but at no less than 60 degrees;
¢) be striped for 2 to 4 lanes with each lane 12 feet wide;
d) -- slope upward from the gutter line on a straight slope of 3
percent or less for at least 75 feet and a slope of no more than 5
percent thereafter;
e) havea "STOP" sign control and appropriate "Keep Right" and
"Yield" sign controls for channelization; signalization may be
required. Level of service and traffic signal warrants should be
conducted for all high volume driveways; and comply with the
following geometric standards:
NOTE; The Board may vary these standards due to unique factors
such as a significant level of truck traffic.
A a a
21
Item Desired Minimum Maximum
Value (ft.) Value (ft.) Value (ft.
W/O
CHANNELIZATION
R 50 30 350
R 24 20} 26
W 6 6 10
W/CHANNELIZATION
R ; 100 75 100
WD 24 20 26
M 6 6 10
WR 20 16 20
*For industrial developments with a high percentage of truck traffic maximum values are
required.
High Volume Orivewsy without Channelization Kigh Volune Oriveway with Channelization
\ oo __ a W,
R | /oR R R
VI
M
W, W, ate
k. Driveway Spacing: Distance from edge of driveway comer (point of
tangency) to edge of intersection comer (point of tangency) by type of
driveway should be as follows:
Minimum Corner Clearance (feet)
Driveway Intersection Intersevtion
Signalization Unsignalization
Low Volume <50-100 trips/day
Medium Volume >50-100 trips/day 150 30
<200 trips/hour
High Volume >200 trips/hour
22
1. Minimum distances between driveways serving the same parcel, measured
from point of tangency to point of tangency by type of driveway, should
be as follows:
Minimuin Spacing to Adjaceni
Driveway by Driveway Type
Driveway Type
Medium High w.o RT High w.R1
(feet) _ (feet) (feet)
High Volume W/O RT 75 150
(without right-turn
channelization}
High Volume W/RT (with 75 250 500
right-turn channelization)
m. The mininrum distance between driveway to property line, as measured
from point of tangency, should be:
Driveway Type Minimum Spacing to
Property Line (ft.1
Low Volume 10
Medium Volume 20
High Volume (without right-turn 75
channelization)
High Volume (with right-turn channelization) 75
For lots with shared access, the driveway may be located along the
property line. The minimum spacing to property line may be varied if (1)
the safest point of access to the site is closer to the property line and (2)
there are at least 20 feet of separation between low volume driveways
serving adjacent parcels, 40 feet of separation between medium volume
driveways, and 150 feet of separation between high volume driveways.
n. When the proposed development is to be located on the opposite side of an
existing development, the driveway shall be directly opposite of the
existing driveway or separated from the opposite driveway by a minimum
of seventy-five (75) feet whenever possible.
23
o. When aconversion or expansion of an existing use occurs, access shall be
upgraded to comply with these standards. This requirement may be
waived upon a written finding that (a} the need to demolish or
relocate an existing building on the site where full access presently exists
and cannot be provided by an adjacent side street.
8. Off-Street Parking
a. Ause shall not be extended and no structure shall be constructed or
enlarged unless sufficient off-street automobile parking space is provided.
The location of parking to the side or rear of buildings is encouraged.
b. Parking areas shall be arranged so that it is not necessary for vehicles to
back into the street.
c. Where the development will abut an existing or potential parking area
provisions shall be made for internal vehicular connections.
d. Required off-street parking for all land uses shall be located on the same
lot as the principal building or facility. The Board may allow the required
or provided off-street parking to be located within 300 feet measured
along lines of public access. Such off-lot parking areas shall be held in fee
simple by the owner of the use served or in such other tenure as assures
continued availability for parking as long as the particular land will be
needed for such use provided that if tenure is other than ownership in fee
simple, the form of tenure shall be approved by the Selectmen before the
request is considered by the Board. Evidence of fee simple ownership or
approved tenure shall be required.
e. The joint use of a parking facility by two or more principal buildings or
uses may be approved by the Board where it is clearly demonstrated that
said parking facilities would substantially meet the intent of the
requirements by reason of variation in the probable time of maximum use
by patrons or employees of such establishments.
f. The use of an existing building for its current use shall be deemed to be in
compliance with the off-street parking requirements of this section.
However, any change in the use above the first floor or any renovation
which increases the floor area shall be required to comply with the
required off-street parking requirements for the increased floor area.
g. Access to parking stalls should not be from major interior travel lanes, and
shall not be immediately accessible from any public way.
h. Parking areas shall be designed to permit each motor vehicle to proceed to
and from the parking space provided for it without requiring the moving of
any other motor vehicles.
i. _ Parking aisles should be oriented perpendicular to stores or businesses for
easy pedestrian access and visibility.
24
j- Inpaved parking areas, painted stripes shall be used to delineate parking
stalls. Stripes should be a minimum of 4 inches in width. Where double
lines are used, they should be separated a minimum of 1' 0" on center.
k. In aisles utilizing diagonal parking, arrows should be painted on the
pavement to indicate proper traffic flow.
1. Bumpers or wheel stops shall be provided where overhang of parked cars
might restrict traffic flow on adjacent through roads, restrict pedestrian
movement on adjacent walkways, or damage landscape materials.
m. Off-street parking spaces shall comply with the following standards:
1) Except as provided below, each parking space shall contain a
rectangular area at least eighteen (18) feet long and nine (9) feet
wide. Lines demarcating parking spaces may be drawn at various
angles in relation to curbs or aisles, so long as the parking spaces so
created contain within them the rectangular area required by this
section.
2) Up to twenty (20) percent of required parking spaces may contain a
rectangular area of only eight (8) feet in width by fifteen (15) feet in
length. If such spaces are provided, they shall be conspicuously
designated as reserved for small or compact cars only.
n. Off-street parking spaces shall be provided to conform with the number
required in the following schedule.
Dedicated Retirement Home, Nursing | 1 % space per dwelling unit
Care Facility
Tourist home, boarding, lodging house, | 1 space per room/unit rental and 1 space for each employee on
motel, hotel, inn, bed & breakfast the largest shift
pce port asd pon maton ening cpa
Schools
Primary 1.5 spaces per classroom
Secondary 5 spaces per classroom
Post-Secondary
Private clubs or lodges 1 space per four seats based upon maximum seating capacity
Theater, auditoria, public assembly 1 space per four seats based upon maximum seating capacity
a
25
Library, museum, art gallery 1 space for 150 sq.ft. of floor space
Banks, medical, dental, veterinary 5 spaces per 1,000 sq. ft. of gross floor area
offices, child care
Retail and service businesses 3.5-spaces per 1,000- sq.ft. of gross floor area
Drive-in restaurant/snack bar Minimum 15 spaces plus 4 sq. ft. of parking for each for each
sq. ft. of gross floor space in excess of 2,500 sq. ft.
Industria] businesses 1 space per employee on maximum working shift
Warehouse, wholesale 1 space per 1,000 sq.ft. of gross floor area
3 spaces/able
Automobile repair garages and 2 spaces for each bay or area used for repair work plus 1 space
gasoline filling stations per employee
Motor vehicle sales 1 space per 10 vehicles displayed on the lot
Commercial recreation facility 0.5 space for each 100 sq.ft. of floor area
total of individual uses
NOTES:
1. Where the calculation of the aforementioned parking spaces results in a fractional part
of a complete parking space, the parking spaces required shall be construed to be the
next highest number.
2. The above are minimum standards, and additional parking spaces shall be required if
necessary to provide off street parking.
3. Where floor space is to be used in calculating the number of required parking stalls,
gross floor area shall be used unless otherwise noted.
9. Pedestrian and Trail Access
The proposed development shall provide safe pedestrian access within the
project parcel and interconnection with existing facilities on abutting properties
including connection and/or preservation of existing snowmobile trails with
easements to maintain a multi-use trail system within the Town of Sabattus. To
preserve these opportunities, the Board may require the applicants to record
easements or require conditions of approval which define future access rights
between properties to accomplish the goals of the Comprehensive Plan .
10. Impact on Community Services and Facilities
When the Board finds, based on the results of any municipal service impact
analysis, that municipal services do not have the capacity to provide services to
the proposed development, the Board will require one or more of the following,
a. A voluntary monetary payment or donation or goods or services to the Town
of Sabattus that would mitigate the direct impact to municipal services that has
26
; been identified as the consequence of the proposed development. Any such
payment shall be subject to the following provisions.
1, The Board, with advice from the Selectmen and/or department heads,
shall find that the money offered will be sufficient to mitigate the
identified direct impact of the development.
2. The payment shall be held in a reserve account and may only be
expended to fund capital improvements agreed to by the applicant and
Board to mitigate the identified direct impacts.
3. The payment in all cases shall be expended within five years of
collection, unless otherwise agreed upon the Board and applicant.
4. Any payment not expended shall be refunded to the property owner(s)
of record at the time of the refund with interest as earned by the Town
of Sabattus for the period the payment was held by the Town.
b. The applicant will construct or pay to construct her/his proportional share,
as determined by any municipal service impact analysis, of the required
improvements necessitated by the development.
c. Require phasing of the development to allow the expansion of municipal
services over time.
d. Deny the application.
11. Water Supply
The development has sufficient water available for the intended use, When
the location of the water supply source will be a public water supply as
defined in Title 22 M. M.R.S.A. Section 2601, its location shall not restrict
the location of a subsurface sewage disposal system on adjacent parcels.
If subsurface sewage disposal will be restricted, the applicant shall obtain
an easement.
a. The proposed development shall not generate a demand on the source,
treatment facilities or distribution system of the Sabattus Sanitary
District/Water Division beyond the capacity of those system components,
considering improvements that are planned to be in place prior to
occupancy of the subdivision. The applicant shall be responsible for
paying the costs of system improvements to the Division's system as
necessary in order to facilitate connection.
b. When the development is to be served by a public water system, the
complete supply system within the development including fire hydrants,
shall be installed at the expense of the applicant. The size and location of
mains, gate valves, hydrants, and service connections shall be reviewed
and approved in writing by the Sabattus Sanitary District/Water Division
and the fire chief.
27
12. Sewage Disposal.
The development shall provide for a suitable sewage disposal.
a. All individual on-site systems will be designed by a licensed soil evaluator
in full compliance with the Maine Subsurface Wastewater Disposal Rules.
b. The Board may require an analysis and evaluation including nitrate-
nitrogen concentrations of the impacts of the subsurface sewage disposal
system on ground water. The Board shall base its determination for the
need for an analysis and evaluation on density, designed flows and nature
of wastewater.
¢. When the development is proposed to be served by the public sewage
system,the complete collection system within the development
subdivision, including manholes and pump stations, shall be installed at
the expense of the applicant.
i. The Sabattus Sanitary District shall certify that providing service to
the proposed development is within the capacity of the system's
existing collection and treatment system or improvements planned to
be complete prior to the construction of the development.
2. The Sabattus Sanitary District shall review and approve the
construction drawings for the sewerage system. The size and location
of laterals, collectors, manholes, and pump stations shall be reviewed
and approved in writing by the servicing Disrict.
13. Mamergency Vehicle Access. Provisions shall be made for providing and
maintaining convenient and safe emergency vehicle access to all buildings and
structures.
Waste Disposal. The proposed development will provide for adequate disposal
of solid wastes and hazardous wastes.
a. All solid waste will be disposed of at a licensed disposal facility having
adequate capacity to accept the project's wastes.
b. All hazardous waste will be disposed of at a licensed hazardous waste
disposal facility and evidence of a contractual arrangement with the
facility shall be submitted
14. Surface Water. The proposed activity will not result in undue surface water
pollution. In making this determination, the Board shall at least consider the
elevation of land above sea level and its relation to the floodplains, the nature of
soils and subsoils and, if necessary, their ability to adequately support waste
disposal and/or any other approved licensed discharge, the slope of the land and
its effect on effluent.
28
15. Phosphorous Export. Projects proposed within the direct watershed of a lake
or pond listed below shall be designed to limit phosphorus runoff to the levels
defined below. The Board shall keep an accurate record of permits issued by
watershed using an appropriate record keeping system, and shall review actual
development rates and recommend adjustments to the table at five year
intervals, subject to a reasonable appropriation by the Town to conduct such a
reassessment, or the availability of adequate State or regional grant programs or
technical assistance programs. Adjustments shall be made by amendment of
this ordinance and the town's comprehensive plan.
Z. se |e 123 ne | 2 ;
HERBS ER & (228 R258 53 [SSE 2s 423
PASkess $ |/LRs FER Ee RRR REISS 8
'a -- ss = ~ Fj ~" Te = SA sr -- = a ao
1,045
Loon Pond | 190 [iso 2s [45 2 Timod-sen [im _[ 240 | 053
restore
ae ee
Source: Maine Department of Environmental Protection (DEP), Watershed Division 11/8/2010
' Water quality category is an assessment by the Maine Department of Environmental Protection of the
ioe ieee uality, but high potential for phosphorus
Mod-sen (Mo ensitive- Average water quality, igh p recycling
from lake bottom sediments).
Poor-restore (Poor/Restorable- Supports algal bloom-restorable).
* Medium level of protection,
5 Lake Watershed Load Allocation represents pounds (Ibs) phosphorus per acte per year allocated to
Sabattus' share of watershed per parts per billion (ppb).
a. Phosphorus export from a proposed development shall be calculated according to the
procedures defined in "Phosphorus Control in Lake Watersheds: A Technical Guide
for Evaluating New Development" (Maine DEP et.al, September 1989 with revision in
1992 and as may be amended). Upon request, copies of all worksheets and calculations
shall be made available to the Planning Board.
b. Phosphorus control measures shali meet the design criteria contained in "Phosphorus
Control in Lake Watersheds: A Technical Guide for Reviewing Development" (Maine
DEP et al., September 1989 with revisions in 1992 or as may be amended). The Planning
Board shall require the reasonable use of vegetative buffers, limits on clearing, and
minimizing road lengths, and shall encourage the use of other nonstructural measures
prior to allowing the use of high-maintenance structural measures such as infiltration
systems and wet ponds,
29
16. Erosion and Sediment Control. Erosion soil and sedimentation of water-
courses and water bodies shall be minimized. The following measures shall be
included, where applicable, as part of any Site Plan Review and approval.
a. Stripping of vegetation, regrading or other development shall be done in
such a way as to minimize erosion.
b. Development shall keep cut-fill operations to a minimum and ensure
conformity with topography so as to create the least erosion potential and
so as to adequately handle surface water runoff.
c. The disturbed area and the duration of exposure of the disturbed area shall
be kept to a practical minimum.
d. Disturbed soils shall be stabilized as quickly as practical.
e. Temporary vegetation or mulching shall be used to protect exposed critical
areas during development.
f. The permanent (final) vegetation and mechanical erosion control measure
shall be installed as soon as practical on the site.
g. Until the disturbed area is stabilized, sediment in the runoff water shall be
trapped by the use of debris basins, sediment basins, silt traps or other
acceptable methods.
h. Whenever sedimentation is caused by stripping vegetation, regrading or
other development, it shall be the responsibility of the developer causing
such sedimentation to remove it from all adjoining surfaces, drainage
systems and watercourses and to repair any damage at his or her expense
as quickly as possible.
i, Maintenance of drainage facilities or watercourses originating and
completely on private property is the responsibility of the owner to the
point of open discharge at the property line or at a communal watercourse
within the property.
j. The standards set forth in the Maine Erosion and Sediment Control
Handbook for Construction, Best Management Practices (March 1991 and
as amended) shall be employed.
17, Stormwater Management. The proposed development will not result in undue
surface water pollution or significantly change the quantity or quality of stormwater
runoff.
a. The proposed development will, to the greatest extent practical, be
designed to maintain the normal hydrologic cycle of the land prior to
development, including having similar amounts of precipitation falling on
the site infiltrate, evaporate (evapotranspiration) or run off. For
redevelopment of previously developed areas, the techniques noted herein
shall be applied to the greatest extent practical.
30
b. _All construction shall be designed to minimize storm water runoff from
the site in excess of the natural pre-development conditions. Stormwater
management systems shall maintain the natural drainage characteristics to
the extent feasible; existing natural runoff control features, such as berms,
swales, terraces and wooded areas shall be retained in order to reduce
runoff and encourage infiltration of storm waters. The use of constructed
natural type features is preferred over engineered structures for the control
of stormwater quantity or quality where existing natural features must be
supplemented to obtain the necessary results.
c. Development shall use Low Impact Development techniques as presented
in the Maine DEP Stormwater Best Management Manual.
d. Storm water runoff control systems shall be maintained as necessary to
ensure proper functioning.
€. If applicable development will comply with the Sabattus Non-Storm
Water Discharge Ordinance.
f. If applicable an approved Post-Construction Stormwater Management
Plan meeting the standards of the Post-Construction Stormwater
Management Ordinance.
18. Noise. The proposed development shall not raise noise levels to the extent that
abutting or nearby residents are adversely affected.
a. The maximum permissible sound pressure level of any continuous, regular
or frequent or intermittent source of sound produced by any activity shall
be limited by the time period and land use which it abuts listed below.
Sound levels shail be measured at least 4 feet above ground at the property
boundary of the source.
b. Noise shall be measured by a meter set on the A-weighted response scale,
fast response. The meter shall meet the American National Standards
Institute (ANSI 81 4-1961) "American Standard Specification for General
Purpose Sound Level Meters."
¢. The following uses and activities shall be exempt from the sound pressure
level regulations:
1. Noises created by construction and temporary maintenance activities
between 6:30 a.m. and 8:00 p.m.
2. The noises of safety signals, warning devices and emergency
reassure relief valves and any other emergency activity.
3. Traffic noise on public roads.
3]
Primary Adjacent Land Use Sound Pressure Level Limits Using the Equivalent Sound
Level over a one-hour period (measured in the A-
weighted db (a) scale) Note: This limit can also be
referred to as the hourly equivalent sound level (Leg 1
hr).
7:00 A.M. to 7:00 P.M. 7:00 P.M. to 7:00A.M.
Residential/Rural ss
[Commercial SSC
Induwridl = [Cd
19. Air Emissions. No emission of dust, ash, smoke or other particulate matter or gases
and chemicals shall be allowed which can cause damage to human or animal health,
vegetation or property by reason of concentration or toxicity, which can cause
soiling beyond the property boundaries, or which fail to meet or cannot meet the
standards set by the Maine Department of Environmental Protection.
20. Odor Control. The proposed development shall not produce offensive or harmful
odors perceptible beyond their lot lines either at ground or habitable elevation.
21. Electromagnetic Interference: The development shall not produce electromagnetic
interference with radio, television or internet reception.
22. The applicant has adequate financial and technical capacity to meet these standards.
23. The proposed activity is in conformance with the comprehensive plan.
B Specific Standards
1. Sand and Gravel Pits
* When this section is in conflict with the Town of Sabattus Groundwater and
Wellhead Protection Ordinance the most restrictive provision shall control.
a. Any gravel pit which requires a permit from the Maine Department of
Environmental Protection under the Site Location of Development Act
shall obtain written approval from the Department of Environmental
Protection and approval by the Board In addition to the submissions
requirements contained in Section 4, the application and development plan
shall include items c. 1-15 below.
b. Any gravel pit or mineral extraction activity which will remove more than
5,000 cubic yards of product in 12 successive months or which does not
require a permit from the Maine Department of Environmental Protection
under the Site Location of Development Act shall require a permit from
the Board. In addition to the submissions requirements contained in
Section 5, the application and development plan shall include items c.1-12
below.
32
c. Submission Requirements
I. The existing and proposed limits of excavation clearly delineated.
2. Location, function and ground area of all structures, facilities,
parking lots, roads, and mud runoff areas.
3. Entrance and exit layout.
4, Gates or other means for controlling access.
5. Pre- and post-development topography using an interval of ten foot
contours for pits of less than five (5) acres and no greater than 10
foot contours for pits of five (5) acres or more if deemed necessary
by the Board.
6. Location of topsoil stockpile areas.
7. Areas where natural vegetation will be left and where plantings will
be made to screen the operation from view.
8. Slopes and vegetation for protecting adjacent structures.
9. Location of any test pits or borings and observation wells
documenting the seasonal high water table.
10. Proposed disposal method of stumps and grubbings.
11. Plans and schedule for reclamation.
12. A Spill Control] and Countermeasure Plan to control spilis of
petroleum products and other hazardous materials.
13. The phases of excavation and reclamation.
14, Surface drainage and watersheds on parcel, pre- and post-excavation.
15. For pits of five (5) acres or more, at least one cross section along the
long axis of the pit and another cross section at a right angle to it.
The cross section diagrams should show the existing grade, the
proposed final grade including maximum depth of elevation, depth
to ground water and the stratigraphy of the surficial deposits at the
site.
d. Review Criteria and Standards
1. A buffer strip of not less than 50 feet shall be maintained between
the location of any extraction of materials and all property lines.
This buffer strip may be reduced to 25 feet with written consent from
abutting property owners. The Board may teduce the front setback
to twenty five feet from the right-of-way of a public road, if in the
opinion of the Board, suitable buffers and fencing are provided.
33
2. Buffers may be eliminated between abutting properties containing
pits provided the Board is shown proof of written permission of the
abutting pit owners.
3. All petroleum products shall be kept out of the pit and no refueling
or oil changes shall be conducted in the pit unless such activities
comply with applicable standards promulgated by the Maine .
Department of Environmental Protection and a spill prevention and
countermeasure plan is provided.
4. There shall be no storage or dumping on the pit of any substances
that could produce harmful leachate unless such substances are
placed under cover and on impermeable, spill-proof base. Such
potentially deleterious substances include, but are not limited to salt,
rubbish, creosoted timber and petroleum products.
5. No oiling of access and haul roads is permitted.
6. No gravel shall be excavated below a position that is 2 feet above the
seasonally high water table without approval of the Maine
Department of Environmental Protection and the Board.
7. No ditches, trenches, pumping or other methods shall be used to
lower the water table to permit more gravel extraction than could
occur under natural conditions unless a plan for such activities has
been approved by the Maine Department of Environmental
Protection and the Board.
8. Access to the pit shall be strictly controlled.
$. All final reclaimed slopes shall not exceed a horizontal to vertical
ratio of 2:1.
10. Reclamation of the pit shall not be made with any substance that
could either have a harmful leachate or create an impermeable base.
11. Stumps and grubbings shall be disposed of in a manner approved by
the Board and in conformance with all applicable State of Maine
regulations.
12. Suitable traffic control measures shall be made available by the
operator at all access points to public streets. Truck routes shall be
restricted to collector and arterial streets. When direct access is not
possible to a collector or arterial street, the Board shall designate a
suitable route to such a street.
13. Upon cessation of the extraction of materials or upon the expiration
of the Board approval, the site shall be rehabilitated in accordance
with a plan approved by the Board.
34
, 14. No part of any extraction operation including drainage and runoff
control features shall be permitted within one hundred (100) feet of
the normal high-water line ofa great pond, and within seventy-five
(75) feet of the normal high-water line of any other water body,
tributary stream, or the upland edge of a wetland as defined.
2. Ground Water Protection
* When this section is in conflict with the Town of Sabattus Groundwater and
Wellhead Protection Ordinance the most restrictive provision shall control.
a. -- In addition to the standards contained in Section 4, the following standards
shall be utilized by the Board for reviewing development applications
located on a mapped sand and gravel aquifer.
b. The boundaries of sand and gravel aquifers shall be as delineated on the
most recent Sand and Gravel Aquifer Map maintained by the Maine
Office of GIS.
¢, When the boundaries of the sand and gravel aquifer are disputed due to
lack of sufficient detail on available maps, the applicant or agent may
submit hydro geologic evidence prepared by a geologist certified in the
State of Maine which identifies actual field locations of the aquifer
boundaries within the project area. The Board may require actual field
identification if they believe the Maine Office of GIS Maps are incorrect.
d. Hydrogeologic Study. Based on the size, location, surrounding uses or
other characteristics of the proposed use or site to determine compliance
with the requirements of this section and the water quality criteria of the
Site Plan Review, the Board may require submittal by the applicant of a
hydro geologic impact study. The impact study shall be prepared by a
State of Maine Certified Geologist with experience in hydro geology. The
study shall contain the following components unless waived by a specific
vote of the Board.
1. Amap showing: (1) soil types; (2) surficial geology on the property;
(3) the recommended sites for individual subsurface waste water
disposal systems and wells in the development; and (4) direction of
ground water flow. (The Board expects the detail of this study to
vary with the intensity of the development.)
2. The relationship of surface drainage conditions to ground water
conditions.
3. Documentation of existing ground water quality for the site.
4. Avnitrate nitrogen analysis or other contaminant analysis as
applicable including calculation of levels of the property line(s) and
well(s) on the property.
35
5. A-statement indicating the potential sources of contamination to
ground water from the proposed use and recommendations on the
best technologies to reduce the risks.
6. For water intensive uses, analysis of the effects of aquifer drawdown
on the quantity and quality of water available for other water
supplies or potential water supplies.
7. The Board may require installation and regular sampling of water
quality monitoring wells for any use or proposed use deemed to be a
significant actual or potential source of pollutants or excessive
drawdown. The number, location and depth of monitoring wells
shall be determined as part of the hydro geclogic study and wells
shall be installed and sampled in accordance with "Guidelines for
Monitoring Well Installation and Sampling" (Tolman, Maine
Geologic Survey, 1983). Water quality sample results from
monitoring wells shall be submitted to the Code Enforcement Officer
with evidence showing that contaminant concentrations meet the
performance standard for pollution levels.
8. A list of assumptions made to produce the required information.
d. Conditions/Standards
In addition to the standards contained in Section 5, the following standards
shall be met:
1. Ne use including home occupations shall dispose of other than
normal domestic waste water on-site without approval of the permit
granting authority. Disposal of waste water shall be in strict
compliance with the Maine Subsurface Wastewater Disposal Rules
and other relevant State and local laws, rules and ordinances.
2. Indoor use or storage facilities where hazardous materials, wastes or
other liquids with the potential to threatened ground water quality
are used or stored shall be provided with containment which is
impervious to the material being stored and have the capacity to
contain 10 percent of total volume of the containers, or 150 percent
of the volume of the largest container, whichever is larger.
3. Petroleum and Other Hazardous Material or Waste Transfer. A Spill
Control and Countermeasure Plan shall be submitted and approved
by the Board.
4. In those areas identified as sand and gravel aquifers the following
land uses are prohibited unless the Board finds that no discharges
will occur such that water quality at the property line will fall below
State Drinking Water Standards and all provisions of this ordinance
are met.
36
, dry cleaners
phcto processors
printers
auto washes
Laundromats
meat packers/slaughter houses
salt piles/sand-salt piles
wood preservers
leather and leather products
electrical equipment manufacturers
plastic/fiberglass fabricating
chemical reclamation facilities
industrial waste disposal/impoundment areas
landfills/dumps/transfer stations
junk and salvage yards
graveyards
chemical manufacturing
pesticide/herbicide stores
metal platers
concrete/asphalt/tar/coal companies
C. Waivers
Where the Board or the Code Enforcement Officer, as the case may be, makes written
findings of fact that due to special circumstances of a particular application, certain
required improvements or standards of this section are not necessary to provide for the
public health, safety or welfare, or are inappropriate because of inadequate or lacking
connecting facilities adjacent to or in proximity of the proposed development, it may waive
the requirement for such improvements, subject to appropriate conditions, provided the
waivers do not have the effect of nullifying the intent and purpose of the comprehensive
plan or this ordinance and further provided the performance standards of this ordinance
have been or will be met. In granting waivers, the Board or the Code Enforcement Officer,
as the case may be, shall require such conditions as will assure the purpose
Section 5. Validity and Separability and Conflict with Ordinances
A. Validity and Separability: Should any section or provisions of this Ordinance be
declared by any court to be invalid, such decision shall not invalidate any other
section or provision of the ordinance.
B. Conflict with other Ordinances: Whenever the requirements of this ordinance are
inconsistent with the requirements of any other ordinance, code or statute, the
more restrictive requirements shall apply.
37
Section 6. Appeals
A. Appeals
If the Board or Code Enforcement Officer disapproves an application or grants approval with
conditions that are objectionable to the applicant or any abutting land owner or any aggrieved
patty, or when it is claimed that the provisions of this Ordinance do not apply, or that the true
intent and meaning of this Ordinance has been misconstrued or wrongfully interpreted, the
applicant, an abutting land owner, or aggrieved party may appeal the decision of the Board or
Code Enforcement Officer's in writing to the Board of Appeals within 30 days of the Board's or
Code Enforcement Officer's decision. The Board of Appeals may reverse the Board's or Code
Enforcement Officer's decision after holding a public hearing. Public Hearings shall be held acc-
ording to Title 30A, M.R.S.A., Section 2411.
Any order, requirement, decision or determination made, or failure to act, in the enforcement of
this ordinance is not appealable to the Board of Appeals.
1. When the Board of Appeals hears a decision of the Board, it shall hold an appellate
hearing, and may reverse the decision of the Board only upon finding that the
decision was contrary to specific provisions of this Ordinance or contrary to the
facts presented to the Board. The Board of Appeals may only review the record of
the proceedings before the Board. The Board of Appeals shall not receive or
consider any evidence which was not presented to the Board, but the Board of
Appeals may receive and consider written or oral arguments. If the Board of
Appeals determines that the record of the PB proceedings are inadequate, the Board
of Appeals may remand the matter to the PB for additional fact finding.
2. When the Board of Appeals reviews a decision of the Code Enforcement Officer
the Board of Appeals shall hold a "de novo" hearing. At this time the Board may
receive and consider new evidence and testimony, be it oral or written. When acting
in a "de novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its
own decision.
B. Appeal Procedure
1. Making an Appeal
a. An appeal may be taken to the Board of Appeals by an aggrieved party
from any decision of the Board or Code Enforcement Officer. Such
appeal shall be taken within thirty (30) days of the date of the decision
appealed from, and not otherwise, except that the Board of Appeals,
upon @ showing of good cause, may wave the thirty (30) day
requirement.
b. Such appeal shall be made by filing with the Code Enforcement
Officer, a written notice of appeal on an application supplied by the
Code Enforcement Officer which he/she will forward to the Board of
Appeals. The notice of appeal shall include but not limited to the
following:
38
1) A concise written statement indicating what relief is requested
and why it should be granted.
2) A-sketch drawn to scale showing lot lines, location of existing
buildings and structures and other physical features of the lot
pertinent to the relief sought.
c. Upon being notified of an appeal, the Board or Code Enforcement
Officer, as appropriate, shall transmit to the Board of Appeals all of the
papers constituting the record of the decision appealed from.
d. The Board of Appeals shall hold a public hearing on the appeal within
thirty -- five (35) days of its receipt of an appeal request.
2. 'Decision by Board of Appeals
a. A majority of the Board of Appeals shall constitute a quorum for the
purpose of deciding an appeal. A member who abstains shall not be
counted in determining whether a quorum exists.
b. The concurring vote of a majority of the members of the Board of
Appeals present and voting shall be necessary to reverse an order,
requirement, decision, or determination of the Board or Code
Enforcement Officer, or to decide in favor of the applicant on any
matter on which it is required to decide under this Ordinance from its
stated terms. The Board of Appeals may reverse the decision, or
failure to act which was clearly contrary to specific provisions of this
Ordinance,
c. The person filing the appeals shall have the burden of proof.
d. The Board of Appeals shall decide all appeals within thirty-five (35)
days after the close of the hearing, and shall issue a written decision
on ali appeals.
The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board shall
cause written notice of its decision to be mailed or hand-delivered to the applicant
within seven (7) days of the Board's decision. Copies of written decisions of the Board
of Appeals shall be given to the Board, Code Enforcement Officer, and the municipal
officers.
3. Appeal to Superior Court
Any aggrieved party who participated as a party during the proceedings before
the Board of Appeals may take an appeal to Superior Court in accordance with
State laws within forty-five (45) days from the date of any decision of the Board
of Appeals.
39
4. Reconsideration
In accordance with Title 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board of Appeals to reconsider a decision must be filed within ten (10) days of the decision
that is being reconsidered. A vote to reconsider and the action taken on that reconsideration
must occur and be completed within forty-five (45) days of the date of the vote on the
original decision. Reconsideration of a decision shall require a positive vote of the majority
of the Board members originally voting on the decision, and proper notification to the
landowner, petitioner, Board, Code Enforcement Officer, and other parties of interest,
including abuttors and those who testified at the original hearing(s). The Board of Appeals
may conduct additional hearings and receive additional evidence and testimony.
Section 7 .Violation, Enforcement and Fines
It shall be the duty of the Code Enforcement Officer of the Town of Sabattus to enforce
the provisions of this ordinance. Ifthe Code Enforcement Officer shall find that any of
the provisions are violated he/she shall notify in writing the person responsible
indicating the nature of the violation and ordering measures to correct it.
A. Violation and Enforcement: The Board, the Selectmen or the appropriate municipal
official upon a finding that any provision of this ordinance or the conditions of a
permit issued under this ordinance is being violated are authorized to institute legal
proceedings to enjoin violations of this ordinance.
B. Fines: A person who violates the provisions of this ordinance or the condition's of a
permit shall be guilty of a civil violation and on conviction shall be fined a minimum of
$ 100 and a not more than $ 2,500. Each day such violation continues, shall constitute
a separate violation. Such persons shall also be liable for court costs and reasonable
attorney fees incurred bythe municipality.
Section 8. Amendments
A. An amendment to this ordinance may be initiated by:
1. The Board, provided a majority of the Board has so voted;
2. Request of the municipal officers; or
3. Written petition of a number of voters equal to at least 10% of the number
of votes cast in the municipality at the last Gubernatorial Election
B. The Board shall hold a public hearing on the proposed amendment. Notification of the
hearing shall be posted in the Town office at least thirteen (13) days before the hearing
and published in a newspaper of general circulation in the municipality at least two times
with the date of the first publication at least twelve (12) days before the hearing and the
date of the second publication at least seven (7) days before the hearing.
C. An amendment to this Ordinance may be adopted by the majority vote ofa regular or
special town meeting.
40
Section 9. Definitions
Construction of Language
In the interpretation and enforcement of this Ordinance, all words other than those
specifically defined in the various ordinances shall have the meaning implied by their context
or their ordinarily accepted meaning. In the case of any difference of meaning or implication
between the text of this Code and any map, illustration or table, the text shall control.
The word "person" includes a firm, association, organization, partnership, trust,
company or corporation as well as an individual or any other legal entity.
The present tense includes the future tense, the singular number includes the
plural and the plural numbers includes the singular,
The words "shall" and "will" are mandatory, the word "may" is permissive.
The word "lot" includes the word "plot" and "parcel."
The word "structure" includes the word "building."
The word "used" or "occupied," as applied to any land or building, shall be
construed to include the words "intended, arranged, or designed to be used or
occupied."
The words "Town" or "municipality" means the Town of Sabattus, Maine.
Abandoned Activity, Use, or Business: An activity, use, or business (1) that has stopped,
and (2) from which the major portion of the materials, goods, equipment, or facilities
necessary for its operation has been removed.
Accessory Structure or Use: A use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated, shall not subordinate the
principal use of the lot. A deck or similar extension of the principal structure or a garage
attached to the principal structure by a roof or a common wall is considered part of the
principal structure.
Aggrieved Party: An owner of land whose property is directly affected by the granting or
denial of a permit or variance; or a person whose land abuts or is across a road or street or
body of water from land for which a permit or variance has been granted; or any other
person or group of persons who have suffered particularized injury as a result of the
granting or denial of such permit or variance.
Arterial Street: A major thoroughfare which serves as a major traffic way for travel
between and through the municipality.
Authorized Agent: An individual or a firm having written authorization to act on behalf of a
property owner or applicant. The authorization shall be signed by the property owner or
applicant.
41
Automobile Graveyard: A place where three or more unrepisteredl, unserviceable,
discarded, worn-out or junked automotive vehicles, or bodies, or eragines thereof are
gathered together and may include the sale of used vehicles.
Automobile Recycling: A premise of a person who purchases or acquires salvage vehicles
for the purpose of reselling the vehicles or component parts of the vehicles or rebuilding or
repairing salvage for the purpose of resale or for the selling the basic materials in the salvage
vehicles, provided that eighty (80) percent of the business premises as defined in Title 30-A
M.R.S.A. Section 3755, subsection 1, paragraph C, is used for automobile recycling
operations.
Average Daily Traffic (ADT): The average number of vehicles per day that enter and exit
the premises or travel over a specific section of road.
Building: Any structure having a roof or partial roof supported by columns or walls used for
the shelter or enclosure of persons, animals, goods or property of any kind. A building shall
include a multiple family dwelling.
Code Enforcement Officer: A person appointed by the municipal officers to administer
and enforce this code.
Commercial Use: Commercial shall include the use of lands, buildings, or structures, other
than home occupations, the intent and result of which activity is the production of income
from the buying and selling of goods or services, exclusive of rental of residential buildings
or dwelling units.
Complete Application: An application shall be considered complete upon submission of
the required fee, a signed application and all information required by this Ordinance except
as validly waived a vote by the Board to waive the submission of required information.
Constructed: Built, erected, altered, reconstructed, moved upon, or any physical operations
on the premises which are required for construction. Excavation, fill, drainage, and the like,
shall be considered a part of construction.
Corner Clearance: The minimum distance, measured parallel to a highway, between the
nearest curb, pavement or shoulder line of an intersecting public way and the nearest edge of
a driveway excluding its radii.
Developed Area: Any area on which a site improvement or change is made, including
buildings, landscaping, parking areas, and streets.
Development: Any manmade changes to improved or unimproved real estate, including
but not limited to, buildings or other structures, mining, dredging, filling, grading, paving,
excavation or drilling operations.
Driveway Volumes:
Low volume driveways: Driveways with less than 50 vehicle trips/day based on the latest
edition of the Institute of Traffic Engineers' Trip Generation Report.
Median volume driveways: Driveways with more than 50 vehicle trips/day but fewer than
42
200 peak hour vehicle trips, based on the latest edition of the Institute of Traffic Engineers'
Trip Generation Report.
High volume driveways: Driveways with more than 200 peak hour vehicle trips based on the
latest edition of the Institute of Traffic Engineers' Trip Generation Report.
Erosion and Sediment Control Plan: A plan depicting effective soil conservation measures
for the activity proposed. This plan shal] contain but not be limited: topographic features;
types, depth, slope and extend of soils; staging of activities; temporary and permanent
erosion control measures and faculties and guidelines for their interim and continued
maintenance.
Expansion of a Structure: An increase in the floor area or volume of a structure including
all extensions such as, but not limited to attached: decks, garages, porches and preenhouses.
Expansion of Use: The addition of one month to a use's operating season; or the use of
more floor area or ground area devoted to a particular use.
Floor Area: The sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls, plus the horizontal area of any unenclosed portions of a structure such as
porches and decks.
Freshwater Wetland: Freshwater swamps, marshes, bogs and similar areas which are:
1, Inundated or saturated by surface or ground water at a frequency and for a
duration sufficient to support, and which under normal circumstances do support,
a prevalence of wetland vegetation typically adapted for life in saturated soils; and
2. Not considered part of great pond, river, stream or brook.
Freshwater wetlands may contain small stream channels or inclusions of land that do
not conform to the criteria of this definition,
Gravel Pit: See mineral extraction.
Hazardous Waste: As defined in 38 M_R.S.A. Section 1303 as may be amended.
Home Occupation: An occupation or business activity which results in a product or service
and is conducted in whole or in part in the dwelling unit or accessory structure.
Industrial: The use of real estate, building or structure, or any portion thereof,
for assembling, fabricating, manufacturing, packaging or processing operations.
Inspecting Official: An individual or individuals appointed by the selectmen to assure
that ail municipal specifications, requirements and conditions of approval shall be met
during the construction and shall assure the satisfactory completions of improvements.
The Inspecting Official shall possess such education and training that the selectmen deem
necessary to perform all aspects of inspection.
43
Institutional: The use of real estate, building or structure devoted to some public,
governmental, education, religious, charitable, medical or similar purpose.
Larger Vehicle: A vehicle that has a larger length, width or turning radius and/or lesser
acceleration capacity than standard passenger vehicles or small trucks. Larger vehicles
include busses, commercial trucks and recreational vehicles.
Line of Sight: The direct view of the object from the designated scenic resource.
Manufacturing: The making of goods and articies by hand or machinery. Manufacturing
shall include assembling, fabricating, finishing, packaging or processing operations.
Mineral Exploration: Hand sampling, test boring, or other methods of determining the
nature or extent of mineral resources which create minimal disturbance to the land and
which include reasonable measures to restore the land to its original condition. Mineral
exploration shall not include testing for a quarry.
Mineral Extraction: Any operation within any twelve (12) successive month period
removes more than 5,060 cubic yards of soil, topsoil, loam, sand, gravel, clay, peat, or
other like material from its natural location, and to transport the product removed, away
from the extraction site. Mineral extraction shall not include the term quarry.
New Construction: Means structures for which the "start of construction" commenced on
or after the effective date of floodplain management regulations adopted by a community.
Persons: Means any person, firm, association, partnership, cooperation, municipal or other
local government entity, quasi-municipal entity, state agency, educational or charitable
organization or institution or other legal entity.
Professional Engineer: A professional engineer, registered in the State of Maine.
Quarry: A place where stone is excavated from rock.
Recreational Facility: A place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Retail: A business establishment engaged in the sale, rental or lease of goods or services to
the ultimate consumer for direct use or consumption and not for resale.
Reclamation Plan: A plan which depicts how the project will be restored after the
excavation is complete. Such a plan shall include but not be limited to final grading the re-
vegetation.)
Structure: Anything constructed erected or placed on the ground or attached to something
on the ground which is permanent, temporary or mobile, Structure/s include but are not
limited to buildings, recreational vehicles, piers and floats and storage and processing
facilities. Boundary walls, fences and flag poles are not considered structures The term
includes structures temporarily or permanently located, such as decks, patios, and satellite
dishes.
Sel
Substantial Start: Completion of at least 30% of a permitted structure or use measured as a
percentage of the total estimated cost.
Topsoil Removal: Shall mean the excavation of loam or loamy materials from an area for
placement elsewhere.
Use: Any purpose for which the building or other structure or a tract of land may be
designed, arranged, intended, maintained, or occupied; also any activity, occupation,
business, or operation carried on or intended to be carried on in a-building or other structure
or on a tract of land.
Wetland: A freshwater wetlands.