Shoreland Zoning Ordinance, Town of Searsport, Maine
Searsport, Maine
· adopted 2017-03-11
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot e838d500b87c · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
SHORELAND ZONING ORDINANCE
Town of Searsport, Maine _
TABLE OF CONTENTS
1. PULPOSCS.......secscscesssessnesnecsnesnearsssecsnesiesssceusensssscsasssasearssustasssnectsscessereascssuesescasesuctasecesssassaseensconceesseseseasee I
2. AUthOrity......eccccseesesssesssssessssessccvevscsnscesssenscsscsussssssucssecsuecevsnucsnecssssuecssssarsnetsssesessesvasvacercessesseseseccceseeces.e I
4. Effectiye Date ststessstsessonescanenscstaauscconcesenensesesneenseconsurscsssneusessentedcensssscaseesurusonssassesertanseerarscseveessanesersceseses 1
© G. Severability.......sserscseessssessnssssescssessscersesscsssessasssucessovcereccesessssscssnsesanessusesssacsstesssassessussssssssesssssesesesecssesce 1
7. Conflicts with Other Ordinances ...........sssssssssssssssecssseecsssecorsssessasessuseessnvesesasessssussssssecensassssseccssescscseccess., 1
B. Amendments .......ecssesssecssssssecssesersssessesscnsssnsssssssnecsaseensssressucesssessessusesucssnsssrecsuasesecesavecssssnearsesssesereceeesescs I
9. Districts and Zoning Map..........sssscscssscsessseesscssusecsssvesssssnvecsesssecsssusessseverssssancerssnscerssansrsesrecscessavecseseeconsse
A. Official Shoreland Zoning Map o...........ssssessersssessecsessaseracsiveseseuesstsenessecsecsasssassesesesecsressecsscesseneceesee
B. Scale Of Map ..s...sssssessssecsescsescvesscssnscrssessssersssuscesvcssesseessesessnessueeasecnsesdecssecsauessayecsecasacssesesascasconescucces'd
C. Certification of Official Shoreland Zoning Map..........sscsscssscecsseecssessssecsssseessscsssecosevessesscsscecesccoess.
D. Changes to the Official Shoreland Zoning Map.........c.ccessscsscsscseccsscsssessecssesscsscsesscsseccecsssecosesevecocseee
10. Interpretation of District Boundaries .............csssssssessesssscsasccossecsnsnssecessssasessssssssssuvesassecseseesessesesseeeeesecees..2
LL, Land Use Requirements.........ssoscccssessssessssssesssssssseccessavsssossssssussssssnieesssassesiessssssusssssstsssivecsssssseccssssscccces 2
12. Non-COmfOrmance .......sesscssesssesccsccsscsueccsesesavesenssenvessunssssacsnsesesavessnersuectsauessassssecssssesscrecssusssseesoasececceseses,
A. PULPOSE....sssssssseeseussesssensecssncssccsssscssseeectscssssssusssssusssusecsusesseevsnsssesersuscceatsssucsansucsasessavensavcssussanescercesss
B. General .......sssessevesssessssssssessessessessasecsessussasesnsssssenesesssnssseseecnsssvesesssecssussussassarsssnsesesssecercarscerceccceceesese
C. Non-conforming Structures..........ssescsssesssessnsssssecessesssssessnsesneessavessacestssssssesssssrsssenstevesasessssesseccasessee
D. Non-conforming Uses .........s.sssssscssesssesscssessneesessstsrssssessessuvesessussavesessasestesessssrsssscasssrssrsssssseseseceecesees.5
E, Non-conforming Lots..........cssssssssssssccnseccevecsssssnsssaresersesssssssavsssnecssecarnevsenecaruesessusassessavesernessneesseeseees 6
13. Establishment of DIStricts.......scssseccssesssessessveensersavesessnensesassacssssuetssssssacsacessssecsecsassaveseciutaseavessctssaserseaccese 6
A. Resource Protection District 0.0... essesssecesssessesssescsssecsssscuresscsnecsecssussassasssactresssercessavensecersesssecereess
B. Stream Protection District .........c.ccsssscsssescssecssseessssscssasecssesesssvcsssuerecsuvcessucesssaseassseccsssesssacsssascesaceeT
C. Halfmoon Pond ..........escsecssseesssscrsesscsseseaecssessssessserssesecssesssesssuesssnecssverseurssnesssssesssesssnvestersesscesesconeecse'?
D. Limited Residential District ...0........sscssssssssssesssssesssseecssseessssesssucanssoessavesssersssssuscsesassesevessenecssneecase
E. Limited Commercial District District ............ssseccsesssusssssssessssesseresseescesssessnsessecssscssucssecssuecesseecesoeecse7
F, General Development I District «0.00... cessssssssssetssesssecssesessecouvencecnessenessnessasssasestesestesersesnseneecoscececse?
G. General Development I District... sssssssssssssessovescsssssecassessseserscsssrecsssscsssssssecssursessesenessseeceesece B
H. Commercial Fisheries/Maritime Activities District ..............ccccccccccecescareccccecceceseeseceeeec 8
14. Table of Land Uses........scsscssssssesssesssessnsessserssssersusessecssascssevesneveceeseuasseussessneesauessettsssesssasesssesessecorseesss.. 10
15. Land Use Standards... .csessecssscusssssessssssnesaseesssssucsrneesersssesensesavesovessassnuesnassarascesesasseseesessersesesces. 11
A. Minimum Lot Standards ...0........essccssssscessscssessvesssesesssessssssersvesarsuesenessassasssesesassserssrsseccesecesecscecesee 11
B. Principal and Accessory Structures.............ecssssssssessesssssssorscecsecsecassssessacsvsssacsesssusstivececessessecessecee.e 12
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Below the Normal High-Water Line of a Water body or Within a Wetland -.....cccssccccsssscosesoce.-o-.. 14
D. Campgrounds .......-s.resccssessvessssecsssccncsconnvessavsssucssnersavessustasssessssessuresnesessuressvcssssesssavesesessnesenasecersccesce 15
E. Individual Private Campsites ............ssssssssssssssessesssscssssssrscssnecaracscesesssacesarsssazesssssscrevssnecconecescesess.e 15
F. Commercial and Industrial Uses ...........ccsscsssssssssssssssssssecncssessussacsserssessessarcnasessssssscoscstossecsesseee.s. 16
G. Parking Areas... .ssssscssecssesseessessssesssuescenesssssesssecsssecerasssseessvessusscnecessaverevessssesssersssasesseeosasecseceneee 10"
H. Roads and Driveways.........scssssssssscssssessssessesssssessnsssssesssevecssssssueasvsessasecsucssseversuressecssesssseneceesccseeee 17
J. Storm Water Runoff .........tesseessescsssccssssssssecsssessesssnesssusensssersvessaresssecessucssseesesssersreatsacessescesscosecceees 18
K. Septic Waste Disposal ............. cc eccesesseeceeeeeeesssnscssevcescessvsvececescerssteseevecersers occoeee 1B
L. Essential Services..........cscssssssccsnscssescssusecsnsssssssssueesssecsssasesssuesesuesevecssssessevessrmuessevanserseressenecsecccsss. 19
M. Mineral Exploration and Extraction..........c...sscssssescsssscsessssessuesseneesorecssssessseessssessscsessecesssecneceseeseeee. 19
N. Agriculture... eecsecscsecsessssessecsucsaseesseecsscssucsasecsssesseussscaseansvssseenecenecessuesussasessssesessusesvsceavssoecessese.20
O-1 Timber Harvesting ~ Statewide Standards .0.........cctsscssssccsescsscsessssesecssecsssssssesscssesstessesersesecoseeee... 20
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting oo... sscescnseeee 20
Q Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal .......cseccsescccsscssscescseconseesoeeeceeeces,..22
R_ Exemptions to Clearing and Vegetation Removal Requirements sesnnsaseneeensenceseseocstssenessnsssenseresven LF
S Revegetation Requirements .............cscssssssssssessessssscsecsoeessessssessesersosesessuressesavecsasecracsenecersosavsnscenecese 24
i :
T. Erosion and Sedimentation Control .........ssssssssessssscrsssssseseseccsssssesecesesssusessceressesssssssernsncenevareesasessae D5
UW, SOUS... 2... eeecesessseeceececcecececcteecereresseesssesesseseecsssecssssessssnseessresseyststssarsesertesee 6
Vi Water Quality. .....ccsesssssssssssssssstssnsesssenesssesssessccesssessusesesuecsussessucszassessessqursessassavssescersesssesseseeseeese, 26
W. Archaeological Site. oeesressescosesssstessnssnsssessnecssesscssssansssnconecuessneesesserssseenesnsssassessesgeccavevarssucssscssessavene 26
16. AGministration ..........ceccsssesssssssssscsssesssessescsseeessuessansesseensnssssessausecevessusecsuessuseseneeserseneesscecsssursanecssnreccene 26
- A. Administering Bodies and Agent ...........ccccssscsesssssseessseesasenerssseossssssssareeseesssesecssscansecesavessscsscessecess D6
B. Permits Required........ccsseccssssecssvessssesscsusesscsnesesnssscansessonessnscessnssessivsssoneresueesenesssnscsssesessssseseseevensanee D7
C. Permit Application .........cccssssscssessescssscnvecssssssssecesssessneessussessavssesassvssaresesssussserssessucesassevessssccsatseereeee 27
D. Procedure for Administering Permits.............c:ccscsssssssscsssscossrcscscossacsresersresecsessesercssesessaressenseoneeeee JB
EB. Special Exceptions ........ssccsssssssscssecserssrsecsssnnssersnsscssssessoassstessssesessvacsessaeccssveravectsssavecesssnevessesveeses D8
F, Expiration of Permit..........scssssssssccsssccssescssssssssnecssscsesssvecsssessssvssssvecsssuccssueesansssnasesssssesssavessensecemneee D9
G. Installation of Public Utility Service ......cccccsesssesssssssisssssssecsvcssuecussssecsasssesssessssssseccersesnsesnsesaseeee D9
H. Appealls......s.sssecssessesscsecscvcsssscsssesessacessvessesssnsesnsussssatecssesevgsssssaueceneqenesarecsuesuesavesaserasecersssnssenvenneesese D9
T. Enforcement .........ssescsssesscssssssecesusescussssecssssessnscssssesaseessnscunessavecsnsenesescesseassssecssersauetssaressesesnseecneeesee 31
17, Definitions .......ccsssesssesssneesesstessssesssssssvesssceveessavessssessassencessusssesecsnsassvessnesersueraderenessasssassesasecsenessaneeceanen 32
: ile :
SECTION 1. PURPOSES
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to prevent and control
water pollution; to protect fish spawning grounds, aquatic life, bird and other wildlife habitat; to protect buildings and
lands from flooding and accelerated erosion; to protect archaeological and historic resources; to protect commercial
fishing and maritime industries; to protect freshwater and coastal wetlands; to control building sites, placement of
structures and land uses; to conserve shore cover, and visual as well as actual points of access to inland and coastal
waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of development in
shoreland areas. , ,
- SECTION 2. AUTHORITY
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435-449 of the Maine Revised
Statutes Annotated (M.R.S.A_).
SECTION 3. APPLICABILITY
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
* normal high-water line of any great pond or river,
¢ upland edge of a coastal wetland, including all areas affected by tidal action, or
¢ upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or other structure extending
or located below the normal high-water line of a water body or within a wetland.
_ SECTION 4._-Effective Date of Ordinance and Ordinance Amendments.
This Ordinance, which was adopted by the municipal legislative body on MARCH 16, 1991, shall not be effective
unless approved by the Commissioner of the Department of Environmental Protection. A certified copy of the
Ordinance, or Ordinance Amendment, attested and signed by the Municipal Clerk, shall be forwarded to the
Commissioner for approval. If the Commissioner fails to act on this Ordinance or Ordinance Amendment, within
forty-five (45) days of his/her receipt of the Ordinance, or Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period shall be governed by
the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance Amendment, is approved by
the Commissioner.
SECTION 5. AVAILABILITY
A certified copy of this Ordinance shall be filéd with the Municipal Clerk and shall be accessible to any member of the
public. Copies shall be made available to the public at reasonable cost at the expense of the person making the request.
Notice of availability of this Ordinance shall be posted.
SECTION 6. SEVERABILITY
Should any section or provision of this Ordinance be declared by the courts to be invalid, such decision shall not
invalidate any other section or provision of the Ordinance.
SECTION 7. CONFLICTS WITH OTHER ORDINANCES
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of this Ordinance or of
any other ordinance, regulation or statute administered by the municipality, the more restrictive provision shall control.
SECTION 8. AMENDMENTS
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments, attested and signed by
the Municipal Clerk, shall be submitted to the Commissioner of the Department of Environmental Protection following
adoption by the municipal legislative body and shall not be effective unless approved by the Commissioner, If the
Commissioner fails to act on any amendment within forty-five (45) days of his/her receipt of the amendment, the
amendment is automatically approved. Any application for a permit submitted to the municipality within the forty-five
(45) day period shall be governed by the terms of the amendment, if such amendment is approved by the Commissioner.
1 .
SECTION 9. DISTRICTS AND ZONING MAP
A. Official Shoreland Zoning Map.
The areas to which this Ordinance is applicable are hereby divided into the following districts as shown on the Official
Shoreland Zoning Map(s) which is (are) made a part of this Ordinance:
(1) Resource Protection
(2) Stream Protection
(3) Halfmoon Pond District
(4) Limited Residential
(5) Limited Commercial
(6) Gerieral Development I
(7) General Development II
(8) Commercial Fisheries/Maritime Activities
. B. Scale of Map.
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000 feet. District
boundaries shall be clearly delineated and a legend indicating the symbols for each district shall be placed on the
map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be certified by the
attested signature of the Municipal Clerk and shall be located in the municipal office. In the event the
municipality does not have a municipal office, the Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section 8, are made in the
district boundaries or other matter portrayed on the Official Shoreland Zoning Map, such changes shall be made
on the Official Shoreland Zoning Map within thirty (30) days after the amendment has been approved by the
Commissioner of the Department of Environmental Protection.
SECTION 10. INTERPRETATION OF DISTRICT BOUNDARIES.
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are property lines, the
centerlines of streets, roads and rights of way, and the boundaries of the shoreland area as defined herein. Where
uncertainty exists as to the exact location of district boundary lines, the Board of Appeals shall be the final authority as to
location.
SECTION 11. LAND USE REQUIREMENTS
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied, and no building or
structure or part thereof shall hereafter be erected, constructed, expanded, moved, or altered and no new Jot shall be
created except in conformity with all of the regulations herein specified for the district in which it is located, unless a
variance is granted.
SECTION12. N ON-CONFORMANCE ;
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-conforming
conditions that existed before the effective date of this Ordinance or amendments thereto Shall be allowed to
continue, subject to the requirements set forth in Section 12. Except as otherwise provided in this Ordinance, a
non-conforming condition shall not be permitted to become more non-conforming.
B. General
] Transfer of Ownership.
Non-conforming structures, lots, and uses may be transferred, and the new owner may continue the non-
conforming use or continue to use the non-conforming structure or lot, subject to the provisions of this Ordinance.
2
2 Repair and Maintenance.
This Ordinance allows, without a permit, the normal upkeep and maintenance of non-conforming uses and
structures including repairs or renovations that do not involve expansion of the non-conforming use or structure, and
such other changes in a non-conforming use or structure as federal, state, or local building and safety codes may
require. .
C. Non-conforming Structures
1. Expansions.
-All new principal and accessory structures, excluding functionally water-dependent uses, must meet the water
body, tributary stream, or wetland setback requirements contained in Section 15(B)(1). A non-conforming
structure may be added to or expanded after obtaining a permit from the same permitting authority as that for a
new structure, if such addition or expansion does not increase the non-conformity of the structure and is in
accordance with subparagraphs (a) and (b) below.
(a)_Expansion of any portion of a structure within 25 feet of the normal high-water line of a water body, ;
tributary stream, or upland edge of a wetland is prohibited, even if the expansion will not increase
nonconformity with the water body, tributary stream or wetland setback requirement. In the Halfmoon Pond
District, any expansion or new development is prohibited within 75 feet of the normal high water line. #
Expansion of an accessory structure that is located closer to the normal high water-line of a water body,
tributary stream, or upland edge of a wetland than the principal structure is prohibited, even if the expansion
will not increase nonconformity with the water body, tributary stream, or wetland setback requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal structure is efitirely
located less than 25 feet from the normal high-water line of a water body, tributary stream, or upland edge
of a wetland, that structure may be expanded as follows, as long as all other applicable municipal land use
standards are met and the expansion is not prohibited by Section 12(C)(1).
(i) The maximum total footprint for the principal structure may not be expanded to a size greater than
800 square feet or 30% larger than the footprint that existed on January 1, 1989, whichever is greater.
The maximum height of the principal structure may not be made greater than 15 feet or the height of
the existing structure, whichever is greater.
(c) All other legally existing nonconforming principal and accessory structures that do not meet the water
body, tributary stream, or wetland setback requirements may be expanded or altered as follows, as long as
other applicable municipal land use standards are met and the expansion is not prohibited by Section
12(C)(1) or Section 12(C)(1)(a), above.
(i) For structures located less than 75 feet from the normal high-water line of a water bady, tributary
stream, or upland edge of a wetland, the maximum combined total footprint for all structures may not
be expanded to a size greater than 1,000 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of any structure may not be made greater
than 20 feet or the height of the existing structure, whichever is greater.
(ii) For structures located less than 100 feet from the normal high-water line of a great pond classified as
GPA or a river flowing to a great pond classified as GPA; the maximum combined total footprint for
all structures may not be expanded to a size greater than 1,500 square feet or 30% larger than the
footprint that existed on January 1, 1989, whichever is greater. The maximum height of any structure
may not be made greater than 25 feet or the height of the existing structure, whichever is greater. Any
portion of those structures located less than 75 feet from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland must meet the footprint and height limits in Section
12(C)(1)(b)G@) and Section 12(C)(1)(c)(i), above. :
(iii) In addition to the limitations in subparagraphs (i) and (ii), for structures that are legally
nonconforming due to their location within the Resource Protection District when located at less than
3 : é
250 feet from the normal high-water line of a water body or the upland edge of a wetland, the
maximum combined total footprint for all structures may not be expanded to a size greater than 1,500
square feet or 30% larger than the footprint that existed at the time the Resource Protection District
was established on the lot, whichever is greater. The maximum height of any structure may not be
made greater than 25 feet or the height of the existing structure, whichever is greater, except that any
portion of those structures located less than 75 feet from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland must meet the footprint and height limits in Section
12(C)(1)(b)(i) and Section 12(C)(1)(c)(i), above. ;
(d) An approved plan for expansion of a nonconforming structure must be recorded by the applicant with the
registry of deeds, within 90 days of approval. The recorded plan must show the existing and proposed
footprint of the non-conforming structure, the existing and proposed structure height, the footprint of any
other structures on the parcel, the shoreland zone boundary and evidence of approval by the municipal
review authority.
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed under a non-conforming
structure, the structure and new foundation must be placed such that the setback requirement is met to the
greatest practical extent as determined by the Planning Board or its designee, basing its decision on the
criteria specified in Section 12(C)(3) Relocation, below.
(3) Relocation. A non-conforming structure may be relocated within the boundaries of the parcel on which the
structure is located provided that the site of relocation conforms to all setback requirements to the greatest
practical extent as determined by the Planning Board or its designee, and provided that the applicant
demonstrates that the present subsurface sewage disposal system meets the requirements of State law and the
State of Maine Subsurface Wastewater Disposal Rules (Rules), or that a new system can be installed in
compliance with the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical extent, the Planning
Board or its designee shall consider the size of the lot, the slope of the land, the potential for soil erosion, the
location of other structures on the property and on adjacent properties, the location of the septic system and
other on-site soils suitable for septic systems, and the type and amount of vegetation to be removed to
accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order to relocate a
structure, the Planning Board shall require replanting of native vegetation to compensate for the destroyed
vegetation in accordance with Section 15(S). In addition, the area from which the relocated structure was
removed must be replanted with vegetation. Replanting shall be required as follows:
; (a) Trees removed in order to relocate a stricture must be replanted with at least one native tree, three (3) feet
in height, for every tree removed. Jf more than five trees are planted, no one species of tree shall make up
more than 50% of the number of trees planted. Replaced trees must be planted no further from the water
or wetland than the trees that were removed. ,
Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed in order to
relocate a structure must be re-established. An area at least the same size as the area where vegetation
and/or ground cover was disturbed, damaged, or removed must be reestablished within the setback area.
The vegetation and/or ground cover must consist of similar native vegetation and/or ground cover that
was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the structure shall be
replanted with vegetation which may consist of grasses, shrubs, trees, or a combination thereof.
3 (4) Reconstruction or Replacement. Any non-conforming structure which is located less than the required
setback from a water body, tributary stream, or wetland and which is removed, or damaged or destroyed,
4
regardless of the cause, by more than 50% of the market value of the structure before such damage,
destruction or removal, may be reconstructed or replaced provided that a permit is obtained within eighteen -
(18) months of the date of said damage, destruction, or removal, and provided that such reconstruction or
replacement is in compliance with the water body, tributary stream or wetland setback requirement to the
greatest practical extent as determined by the Planning Board or its designee in accordance with the purposes
of this Ordinance. In no case shall a structure be reconstructed or replaced so as to increase its non-
conformity. If the reconstructed or replacement structure is less than the required setback it shall not be any
larger than the original structure, except as allowed pursuant to Section 12(C)(1) above, as determined by the
non-conforming area footprint of the reconstructed or replaced structure at its new location. If the total area
footprint of the original structure can be relocated or reconstructed beyond the required setback area, no
portion of the relocated or reconstructed structure shall be replaced or constructed at Jess than the setback
requirement for a new structure. When it is necessary to remove vegetation in order to replace or reconstruct
a structure, vegetation shall be replanted in accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water body, tributary
stream, or wetland and which is removed by 50% or less of the market value, or damaged or destroyed by
50% or less of the market value of the structure, excluding normal maintenance and repair, may be '
reconstructed in place if a permit is obtained from the Code Enforcement Officer within one year of such
damage, destruction, or removal. ,
In determining whether the building reconstruction or replacement meets the setback to the greatest
practical extent the Planning Board or its designee shall consider, in addition to the criteria in Section
12(C)(3) above, the physical condition and type of foundation present, if any.
(5) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may not be changed
to another use unless the Planning Board, after receiving a written application, determines that the new use
will have no greater adverse impact on the water body, tributary stream, or wetland, or on the subject or
adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require written
documentation from the applicant, regarding the probable effects on public health and safety, erosion and
sedimentation, water quality, fish and wildlife habitat, vegetative covet, visual and actual points of public
access to waters, natural beauty, floodplain management, archaeological and historic resources, and
commercial fishing and maritime activities, and other functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming residential usés
may, after obtaining a permit from the Planning Board, be expanded within existing residential structures or
within expansions of such structures as allowed in Section 12(C)(1) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is discontinued for
. a period exceeding one year, or which is superseded by a conforming use, may not again be devoted to a non-
conforming use except that the Planning Board may, for good cause shown by the applicant, grant up to a one
year extension to that time period. This provision shall not apply to the resumption of a use of a residential
structure provided that the structure has been used or maintained for residential purposes during the preceding
five (5) year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-conforming use provided
that the proposed use has no greater adverse impact on the subject and adjacent properties and resourcés,
including water dependent uses in the CFMA district, than the former use, as determined by the Planning
Board. The determination of no greater adverse impact shall be made according to criteria listed in Section
12(C){5) above.
5 .
E. Non-conforming Lots
| (1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this Ordinance or
amendment thereto may be built upon, without the need for a variance, provided that such lot is in separate
ownership and not contiguous with any other lot in the same ownership, and that all provisions of this
Ordinance except lot area, lot width and shore frontage can be met. Variances relating to setback or other
requirements not involving lot area, lot width or shore frontage shall be obtained by action of the Board of
Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint ownership of record
at the time of adoption of this Ordinance, if all or part of the lots do not meet the dimensional requirements of
this Ordinance, and if a principal use or structure exists on each lot, the non-conforming lots may be conveyed
separately or together, provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through
_4807-D) and the State of Maine Subsurface Wastewater Disposal Rules are complied with. :
If two or more principal uses or structures existed on a single lot of record on the effective date of this
ordinance, each may be sold on a separate lot provided that the above referenced law and rules are complied
with. When such lots are divided each lot thus created must be as conforming as possible to the dimensional
requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in single or joint
ownership of record at the time of or since adoption or amendment of this Ordinance, if any of these lots do
not individually meet the dimensional requirements of this Ordinance or subsequent amendments, and if one
or more of the lots are vacant or contain no principal structure the lots shall be combined to the extent
necessary to meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-conforming, owned
by the same person or persons on the effective date of this Ordinance and recorded in the registry of deeds if
the lot is served by a public sewer or can accommodate a subsurface sewage disposal system in conformarice
with the State of Maine Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a) are reconfigured or
combined so that each new lot contains at least 100 feet of shore frontage and 20,000 square feet of lot
area.
SECTION 13. ESTABLISHMENT OF DISTRICTS
A. Resource Protection District.
The Resource Protection District includes areas in which development would adversely affect water quality,
productive habitat, biological ecosystems, or scenic and natural values. This district shall include the following
areas when they occur within the limits of the shoreland zone, exclusive of the Stream Protection District, except
that areas which are currently developed and areas which meet the criteria for the Limited Residential, Limited
Commercial, General Development I, or Commercial Fisheries/Maritime Activities Districts need not be included
within the Resource Protection District.
(1) Floodplains along rivers and floodplains along artificially formed great ponds along rivers, defined by the 100
year floodplain as designated:on the Federal Emergency Management Agency's (FEMA) Flood Insurance .
Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of these, by soil types
identified as recent floodplain soils. This district shal] also include 100 year floodplains adjacent to tidal
waters as shown on FEMA's Flood Insurance Rate Maps or Flood Hazard Boundary Maps.
(2) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
6
(3) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils, which are not part
of a freshwater or coastal wetland as defined, and which are not surficially connected to a water body during
the period of normal high water.
(4) Land areas along rivers subject to severe bank érosion, undercutting, or river bed movement, and lands
adjacent to tidal waters which are subject to severe erosion or mass movement, such as Steep coastal bluffs.
(5) Areas within 250 feet, horizontal distance, of the upland edge of freshwater and/or coastal wetlands, which are
rated "moderate" or "high" value waterfowl and wading bird habitat, including nesting and feeding areas, by
the Maine Department of Inland Fisheries and Wildlife (MDIF&W). These areas are generally depicted ona
Geographic Information System (GIS) data layer.
B. Stream Protection District. The Stream Protection District includes all land areas within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream, exclusive of those areas within two-hundred and
fifty (250) feet, horizontal distance, of the normal high-water line of a great pond, or river, or within two hundred
and fifty (250) feet, horizontal distance, of the upland edge of a freshwater or coastal wetland. Where a stream and
its associated shoreland area are located within two-hundred and fifty (250) feet, horizontal distance, of the above
water bodies or wetlands, that land area shall be regulated under the terms of the shoreland district associated with
that water body or wetland.
C. Halfmoon Pond Overlay District
The Halfmoon Pond Overlay District includes those areas immediately adjacent to and within two hundred and
fifty (250) feet from the high water line of Halfmoon Pond.
D. Limited Residential District. The Limited Residential District includes those areas suitable for residential and
recreational development. It includes areas other than those in the Resource Protection District, or Steam
Protection District, and areas which are used less intensively than those in the General Development Districts,
Commercial Fisheries/Maritime Activities District, Limited Commercial Districts or Halfmoon Pond District.
E. Limited Commercial District The Limited Commercial District includes areas of mixed, light commercial and
residential uses, exclusive of the Stream Protection District, which should not be developed as intensively as the
General Development Districts. This district includes areas of two or more contiguous acres in size devoted to a
mix of residential and low intensity business and commercial uses. Industrial uses are prohibited.
F. General Development I District. The General Development I District includes the following types of existing,
intensively developed areas:
(1) Areas of two or more contiguous acres devoted to commercial, industrial or intensive recreational activities,
. or a mix of such activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other industrial activities;
. (b) Areas devoted to wholesaling, warehousing, retail trade and service activities, or other commercial
activities; and
(c) Areas devoted to intensive recreational development and activities, such as, but not limited to amusement
: parks, race tracks and fairgrounds.
(2) Areas otherwise discernible as having patterns of intensive commercial, industrial or recreational uses.
G. General Development II District. oo ;
The General Development I District includes the same types of areas as those listed for the General Development
I District. The General Development II District, however, shall be applied to newly established General
Development Districts where the pattern of development at the time of adoption is undeveloped or not as
intensively developed as that of the General Development I District.
Portions of the General Development District I or II may also include residential development. However, no area __
shall be designated as a General Development I or II District based solely on residential use.
In aréas adjacent to great ponds classified GPA and adjacent to rivers flowing to great ponds classified GPA, the
designation of an area as a General Development District shall be based upon uses existing at the time of adoption of
this Ordinance. There shall be no newly established General Development Districts or expansions in area of existing
General Development Districts adjacent to great ponds classified GPA, and adjacent to rivers that flow to great ponds
classified GPA.
-HL Commercial Fisheries/Maritime Activities District.
The Commercial Fisheries/Maritime Activities District includes areas where the existing predominant pattern of
development is consistent with the allowed uses for this district as indicated in the Table of Land Uses, Section
14, and other areas which are suitable for functionally water-dependent uses, taking into consideration such
factors as:
(1) Shelter from prevailing winds and waves;
(2) Slope of the land within 250 feet, horizontal distance, of the shoreline;
(3) Depth of the water within 150 feet, horizontal distance, of the shoreline;
(4) Available support facilities including utilities and transportation facilities; and
(5) Compatibility with adjacent upland uses.
8g
SECTION 14. Table of Land Uses.
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform with all of the
applicable land use standards in Section 15. The district designation for a particular site shall be determined from the
Official Shoreland Zoning Map.
Key to Table 1:
Yes- Allowed (no permit required but the use must comply with all applicable land use standards.)
No- Prohibited
PB- Allowed with permit issued by the Planning Board. ,
CEO - Allowed with permit issued by the Code Enforcement Officer a
LPI- Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP- Resource Protection © GD General Development I and General Development II
LR- Limited Residential CFMA - Commercial Fisheries/Maritime Activities
LC- Limited Commercial SP- Stream Protection
HP-- Halfmoon Pond Overlay District
;
TABLE 1, LAND USES IN THE SHORELAND ZONE
. SP sAP. LR Lc} = GD I&ll CEMA = _HP
1. Non-intensive recreational uses not requiring structures such as hunting, fiehing :
and hiking : : : . "yas yes yes yes yes yes yas
2 _ Motorized vehicular tratfic on existing roada and tralis yes yas yan __yes yes yee yes
3. Forest managemant activities axcept for timber harvesting & land management yes yes yes yes yes sd yas
5 Fire prevanton activities . ; yes yas yas" yes __yes yes __you
6 e management practicas yas yes "yes yas yes yeu yea
7 and water conservation practices yos yes yes ye). yas yas" yes.
8 Mineralexploration -- . na 82 "yae* «yas? -} 3 'vast
§ Minaral extraction n Including sand and gravel extraction ; "no pp? PB Pa PB PB ono"
10 Survaying and resource anolysiz yun yes Yes yes _ yes ys yes
. 13 Emergency oparations yas yes yas yes yea yas yes
12 Agriculture yes PB yes yes yes you "no"
13 sane . . PB Pa PB° yes yas yea na
4 striciures and ueea . one
A. . One tend tren family residential, Including dtvaways ps4 pa? CED Pa fo no PB
B. _ Multi-unit rasidential "na no PB PB no no itn .
c. Commercial . ne na 'no PS PB pai no ©
BD, Industrial ~ no sno no no PB pad no
E: Governmental and inetituflonsl . no no' no PB PR pp® no
F. Small nor-reaidantial fectiities for educational, aclantific, ar nature Interpretation ps4 PB PB i) pas no
"75 Structures accessory to allowed uses raf PE GEO PB "yea a Pa
Bt.) Plecs, docks, wharls, bridges and cihar etructites and unas extonding over or below ~
the normal high-ratar fine or within a wetland " 1 '
B Tamporsry ceo ceo"! = cen? cen"? ~--cen!* cen? cen!
___* Permanent Pa Pa PB Papa? Pa
17 Conversions of seasonal realdences to year-round residences LPi no LPi LPI no no "no.
18 Home occupations © j '3 PB no Pa. "CEO Pe no no
18 Private sewage disposal syatems for allowed uses LPI no. LP} LPI LPI LPI .. PB"
"20 Eacential exrvices, j Fee pao PB Fa Pe FS "
A. Rosdsids distribution lines (34.8% anc lowar} . " CEor Ceo you yea yea . yeas PBS."
B. Noprrosdsl de or cross-country distribution lines involving ten poles ot iees In the Per PP cea CEO ceo cto Pag
shoreland zone : .
[ox Nop-roadaide of crose-couniry distribution nas Involving elaven or more poles in tha ra Fat PB PB PB PB Pae
: shoraland zona .
D, . Other easential services ° " Pat PBY PB aT) FB Fa Pes
21 Service drops; ax defined, to allowed uses _ yes yos yes yes yes yas yeu
22 Public.and private recreational areas [nvalving minimal structural davelopmant PB PB PB CeO CED cEo> na
23 Individual, private campsites no no CEO no no no PB"
: _24 Campgrounds . no no PB10 PB Pa no TO
25 Hosd conatruciian rs PB no® PB PB PB PBS PB
~ 28 Parking tackities © no na' Pe ; Fs Fo PB? no,
28 and earth m of<10 cubic s CEG cEO s PR
25 Filling and earth moving of >10 cubic yards Pa PB CEO CEO CEO CEO a...
"30 : -_ oe "_Yasi2 CE0I2 Yesi2 PB12 FB PS Yea 12
31 Uses aimilar.to allowed uses oo CeO _'.CEO CEO "CEO CEO CEO |
22 Uses similar to uses requiring s CEO permit CEO CEO CEO" CEO CEO CEO _ CEO
33 Usea similar to uses requiring a PB permit Pa PE B Pe PB PB
"in AP not allowed within 75 feat horizontal distance, of the narma! high-water Ene of great ponds, except to remove aafaty hazards,
"2Requiras permit from the Code Enforcement Officer if more than 100 square feet of aurface area, in total, is dieturbed. ,
tn RP not allowed In areas so dealgnated bacaune of wildlife value, ; , -
SProvided thai » varance from the setback requirement Is obtained from the Board of Appasts.
® Functionally Water-dependent uses and uses eccessory to such water dependent uses only. , :
- SSae further reatrictions in Secticri 15( L)(2),
TExeept when ares Is zoned for reaoutce protection due to floodplain criteria In which case « permit fs required from the PB, .
Besant as provided In Section 18(H}4).
Single family residential structures may be allowed by special exception only according to the provisions of Sectian 16{E}, Special Exceptions. Two-family
' residantial structures ere prohibited. ;
Weycent for commercial uses otherwise listed In this Table, such as marinas and campgrounds, that are allowed In the respective dlatrict.
"Excluding bridges and other crossings nat Involving sarthwork, In which case no permit Is required.
12Penmit not required: but must filo a Written "notice of intent to conatruct" with CEQ. .
NOTE: A person perfarming any of the following activities shall require s permit from the Department of Environmental Protection, purauant to 38 M.RS.A. asctlon
480-C, I the activity occurs In, on, over or adjacent ta any frestwater of coastal wetland, grest pond, river, siream ar brook and cperstes In such a manner
that material or gol! may be washed Into them:
A. Dredging, bulldozing, removing or displacing soll, sand, vegetation or other materials;
B. Draialng or otherwise dewatering; a
C. Filing, including adding sand or othar material to 2 sand dune; or .
DB. Any construction or alteration of sny permanent structure.
10
. SECTION 15. __ Land Use Standards.
All land use activities within the shoreland zone shall conform with the following provisions, if applicable. |
A. Minimum Lot Standards
Minimum Lot Minimum
Area (sq. ft.) Shore
Frontage (ft.)
() ,
. (a) Residential per dwelling unit .
(i) Within the Shoreland Zone
Adjacent to Tidal Areas 30,000 150
. (ii) Within the Shoreland Zone
Adjacent to Non-Tidal Areas 40,000 200
(6b) Governmental, Institutional, Commercial or Industrial per principal structure
(i) Within the Shoreland Zone
Adjacent to Tidal Areas, Exclusive
of Those Areas Zoned for
Commercial Fisheries and
Maritime Activities 40,000 200
(ii) Within the Shoreland Zone
Adjacent to Tidal Areas Zoned
for Commercial Fisheries and
Maritime Activities NONE NONE
(iii) Within the Shoreland Zone
Adjacent to Non-tidal Areas 60,000 300
(c) Public and Private Recreational Facilities
(i) Within the Shoreland Zone Adjacent
to Tidal and Non-Tidal Areas 40,000 200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and Jand beneath roads
serving more than two (2) lots shall not be included toward calculating minimum lot area.
(3) Lots located on opposite sides of a public or private-road shall be considered each a separate tract or parcelof
Jand unless such road was established by the owner of land on both sides thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal distance, of the normal
high-water line of a water body or upland edge of a wetland shall be equal to or greater than the shore frontage.
requirement for a lot with the proposed use. ,
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial or industrial
structure or use, or combination thereof, is constructed or established on a single parcel, all dimensional
: Tequirements shall be met for each additional dwelling unit, principal structure, or use.
; ll
(6) Clustered housing within the shoreland zone provided that the overall dimensional requirements, including
frontage and lot area per dwelling unit, are met. When determining whether dimensional requirements are met,
, only land area within the shoreland zone shall be considered. ,
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet, horizontal distance,
from the normal high-water line of great ponds classified GPA and rivers that flow to great ponds classified
GPA, and seventy-five (75) feet, horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland, except that in the General Development I District the setback
from the normal high-water line shall be at least twenty five (25) feet, horizontal distance, and in the
Commercial Fisheries/Maritime Activities District there shall be no minimum setback. In the Resource
Protection District the setback requirement shall be 250 feet, horizontal distance, except for structures, roads,
parking spaces or other regulated objects specifically allowed in that district in which case the setback
requirements specified above shall apply. ,
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to structures which
require direct access to the water body or wetland as an operational necessity, such as piers, docks and
retaining walls, nor to other functionally water-dependent uses,
(b) For principal structures, water and wetland setback measurements shal] be taken from the top of a coastal
bluff that has been identified on Coastal Bluff maps as being "highly unstable" or "unstable" by the Maine
Geological Survey pursuant to its "Classification of Coastal Bluffs" and published on the most recent
Coastal Bluff map. If the applicant and the permitting official(s) are in disagreement as to the specific
location of a "highly unstable" or "unstable" bluff, ar where the top of the bluff is located, the applicant may
at his or her expense, employ a Maine Registered Professional Engineer, a Maine Certified Soil Scientist, a
Maine State Geologist, or other qualified individual to make a determination. If agreement is still not
reached, the applicant may appeal the matter to the board of appeals.
(c) On a non-conforming lot of record on which only a residential structure exists, and it is not possible to place
an accessory structure meeting the required water body, tributary stream or wetland setbacks, the code
enforcement officer may issue a permit to place a single accessory structure, with no utilities, for the storage
of yard tools and similar equipment. Such accessory structure shall not exceed eighty (80) square feet in "
area nor eight (8) feet in height, and shall be located as far from the shoreline or tributary stream as practical
and shall meet all other applicable standards, including lot coverage and vegetation clearing limitations. In
no case shall the structure be located closer to the shoreline or tributary stream than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in the Resource
Protection, Limited Residential, Limited Commercial, and Stream Protection Districts, shall not exceed thirty-
five (35) feet in height. This provision shall not apply to structures such as transmission towers, windmills,
, antennas, and similar structures having no floor area,
(3) The lowest floor elevation or openings of all buildings and structures, including basements, shall be elevated
at least one foot above the elevation of the 100 year flood, the flood of record, or in the absence of these, the
flood as defined by soil types identified as recent flood-plain soils. In those municipalities that participate in
the National Flood Insurance Program and have adopted the April 2005 version, or later version, of the
Floodplain Management Ordinance, accessory structures may be placed in accordance with the standards of
that ordinance and need not meet the elevation requirements of this paragraph.
(4) With the exception of General Development Districts located adjacent to coastal wetlands and rivers that do
not flow to great ponds and Commercial Fisheries/Maritime Activities Districts , non-vegetated surfaces shall
not exceed a total of twenty (20) percent of the portion of the lot located within the shoreland zone. This
12
| limitation does not apply to public boat launching facilities regardless of the district in which the facility is
located.
In a General Development District located adjacent to coastal wetlands, or rivers that do not flow to freat ponds,
or in a Commercial Fisheries/Maritime Activities District, non-vegetated surfaces shall not exceed a total of
seventy (70) percent of the portion of the lot located within the shoreland zone.
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not limited to the
following: structures, driveways, parking areas, and other areas from which vegetation has been removed.
; Naturally occurring ledge and rock outcroppings aré not counted as nonvegetated surfaces when calculating lot -
coverage for lots of record on March 24, 1990 and in continuous existence since that date.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback requirement, except
for low retaining walls and associated fill provided all of the following conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site eroding from lack
of naturally occurring vegetation, and which cannot be stabilized with vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams, coastal wetlands, and
tributary streams, as designated on the Federal Emergency Management Agency's (FEMA) Flood Insurance
Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of these, by soil types
identified as recent flood plain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination thereof, and no further
structural development will occur within the setback area, including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal high-water line of a
water body, tributary stream, or upland edge of a wetland when a natural buffer area does not exist. The
buffer area must meet the following characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation. Where natural ground
cover is lacking the area must be supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide for effective
infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area; .
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured perpendicularly to the
normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the buffer;
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed with a permit
from the Code Enforcement Officer, to provide shoreline access in areas of steep slopes or unstable soils
provided: that the structure is limited to a maximum of four (4) feet in width; that the structure does not extend
below or over the normal high-water line of a. water body or upland edge of a wetland, (unless permitted by the
13
Department of Environmental Protection pursuant to the Natural Resources Protection Act, 38 M.LR.S.A. section
480-C); and that the applicant demonstrates that no reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the Normal
High-Water Line of a Water Body or Within a Wetland, and Shoreline Stabilization
(1) No more than one pier, dock, wharf or similar structure extending or located below the normal high-water line
. of a water body or within a wetland is allowed on a single lot; except that when a single [ot contains at least
twice the minimum shore frontage as specified in Section 15(A), a second structure may be allowed and may
remain as Jong as the lot is not further divided.
_ (2) Access from shore shall be developed on soils appropriate for such use and constructed so as to control erosion.
(3) The location shall not interfere with existing developed or natural beach areas.
(4) The facility shall be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be consistent with the
surrounding character and uses of the area. A temporary pier, dock or wharf in non-tidal waters shall not be
wider than six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure extending beyond the
normal high-water line of a water body or within a wetland unless the structure requires direct access to the
water body or wetland as an operational necessity.
| (7) New permanent piers and docks on non-tidal waters shall not be permitted unless it is clearly demonstrated to
the Planning Board that a temporary pier or dock is not feasible, and a permit has been obtained from the
Department of Environmental Protection, pursuant to the Natural Resources Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure extending beyond the
normal high-water line of a water body or within a wetland shall be converted to residential dwelling units in
any district.
(9) Except in the General Development Districts and Commercial Fisheries/Maritime Activities District,
structures built on, over or abutting a pier, wharf, dock or other structure extending beyond the normal high-
water line of a water body or within a wetland shall not exceed twenty (20) feet in height above the pier,
wharf, dock or other structure.
(10) Vegetation may be removed in excess of the standards in Section 15(P) of this ordinance in order to conduct
shoreline stabilization of an eroding shoreline, provided that a permit is obtained from the Planning Board.
Construction equipment must access the shoreline by barge when feasible as determined by the Planning
Board.
(a) When necessary, the removal of trees and other vegetation to allow for construction equipment access to
the stabilization site via land must be limited to no more than 12 feet in width. When the stabilization
project is complete the construction equipment accessway must be restored.
(b) Revegetation must occur in accordance with Section 15(S).
(11) A deck over a river may be exempted from the shoreland setback requirements if it is part of a downtown
revitalization project that is defined in a project plan approved by the legislative body of the municipality, and
may include the revitalization of structures formerly used as mills that do not meet the structure setback
requirements, if the deck meets the following requirements:
(a) The total deck area attached to the structure does not exceed 700 square feet;
14
(b) The deck is cantilevered over a segment of a river that is located within the boundaries of the downtown
revitalization project;
(c) The deck is attached to or accessory to an allowed commercial use in a structure that was constructed
prior to 1971 and is located within the downtown revitalization project;
. (d) The construction of the deck complies with all other applicable standards, except the shoreline setback
requirements in section 15(B); and
(e) The construction of the deck complies with all other state and federal laws.
D. Campgrounds.
Campgrounds shall conform to the minimum requirements imposed under State licensing procedures and the
following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads and
driveways, for each site. Land supporting wetland vegetation, and land below the normal high-water line of a water
body shall not be included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and service buildings
Shall be set back a minimum of one hundred (100) feet, horizontal distance, from the normal high-water line
of a great pond classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary streams, or the upland
edge of a wetland.
E. Individual Private Campsites.
Individual private campsites not associated with campgrounds are allowed provided the following conditions are met:
. (1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand (30,000) square feet of
lot area within the shoreland zone, whichever is less, may be permitted.
(2) When an individual private campsite is proposed on a lot that contains another principal use and/or structure,
the lot must contain the minimum lot dimensional requirements for the principal structure and/or use, and the
individual private campsite separately,
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or tent platform, shall be
. set back one hundred (100) feet, horizontal distance, from the normal high-water line of a freat pond
classified GPA or river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal
' distance, from the normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall not be located on
any type of permanent foundation except for a gravel pad, and no structure except a canopy shall be attached
to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a Resource
Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage disposal shall be
_ required for each campsite and shall be approved by the Local Plumbing Inspector. Where disposal is off-site,
written authorization from the receiving facility or land owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred and twenty (120)
days per year, all requirements for residential structures shall be met, including the installation of a subsurface
ee ts)
sewage disposal system in compliance with the State of Maine Subsurface Wastewater Disposal Rules unless
served by public sewage system facilities,
F. Commercial and Industrial Uses.
The following new commercial and industrial uses are prohibited within the shoreland zone adjacent to great
ponds classified GPA, and rivers and streams which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
; (3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts normally associated
with individual households or farms
, (5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on Same property as use occurs and
except for storage and sales associated with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas .
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for structures for the district
in which such areas are located, except that in the Commercial Fisheries/Maritime Activities District parking
areas shall be set back at least twenty-five (25) feet, horizontal distance, from the shoréline. The setback
requirement for parking areas serving public boat launching facilities in Districts other than the General
Development I District and Commercial Fisheries/Maritime Activities District shall be no Jess than fifty (50)
feet, horizontal distance, from the shoreline or tributary stream if the Planning Board finds that no other
reasonable alternative exists further from the shoreline or tributary stream.
. (2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent stormwater |
runoff from flowing directly into a water body, tributary stream or wetland and where feasible, to retain all
runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except that parking
spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide. .
16 -
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at Jeast one-hundred (100) feet, horizontal distance, from the normal
high-water line of a great pond classified GPA or a river that flows to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland unless no reasonable alternative exists as determined by the Planning
Board. If no other reasonable alternative exists, the road and/or driveway setback requirement shall be no less
than fifty (50) feet, horizontal distance, upon clear showing by the applicant that appropriate techniques will
. be used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques may
include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch
relief culverts and tumouts placed so as to avoid sedimentation of the water body, tributary stream, or
. wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be increased by ten (10)
feet, horizontal distance, for each five (5) percent increase in slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways that provide
access to permitted structures and facilities located nearer to the Shoreline or tributary stream due to an
operational necessity, excluding temporary docks for recreational uses. Roads and driveways providing access
to permitted structures within the setback area shall comply fully with the requirements of Section 15(H)(1)
except for that portion of the road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their setback froma
water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the Planning Board may
grant a permit to construct a road or driveway to provide access to permitted usés within the district. A road or
driveway may also be approved by the Planning Board in a Resource Protection District, upon a finding that no
reasonable alternative route or location is available outside the district. When a road or driveway is permitted
in a Resource Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1) vertical, and shall
be graded and stabilized in accordance with the provisions for erosion and sedimentation control contained in
Section 15 (T).
: (5) Road and driveway grades shall be no greater than ten (10) percent except for segments of less than two
hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from diréctly entering water bodies, tributary streams -
or wetlands, roads and driveways shall be designed, constructed, and maintained to empty onto an unscarified
buffer strip at least (50) feet plus two times the average slope; in width between the outflow point of the ditch
or culvert and the normal high-water line of 'a water body, tributary stream, or upland edge of a wetland.
Surface drainage which is directed to an unscarified buffer strip shall be diffused or spread out to promote
infiltration of the runoff and to minimize channelized flow of the drainage through the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a manner effective
in directing drainage onto unscarified buffer strips before the flow gains sufficient volume or head to erode
the road, driveway, or ditch. To accomplish this, the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turtiouts shall be spaced along the road, or
driveway at intervals no greater than indicated in the following table:
Grade Spacing
(Percent) (Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten (10) percent or
less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be placed at
approximately a thirty (30) degree angle downslope from a line perpendicular to the centerline of the road
or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for effective
functioning, and their inlet and outlet ends shall be stabilized with appropriate materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control installations associated
with roads and driveways shall be maintained on a regular basis to assure effective functioning.
I. Signs.
The following provisions shall govern the use of signs in the Resource Protection, Stream Protection, Halfmoon
Pond, Limited Residential and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such signs shall not
exceed six (6) square feet in area and shall not exceed two (2) signs per premises. In the Limited Commercial
District, however, such signs shall not exceed sixteen (16) square feet in area. Signs relating to goods or
services not sold or rendered on the premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and shall not exceed
twelve (12) square feet in the agpregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to the sale, rental, or
lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number provided that no
such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights. .
J. Storm Water Runoff
(1} All new construction and development shall be designed to minimize storm water runoff from the site in
excess of the natural predevelopment conditions. Where possible, existing natural runoff contro! features,
such as berms, swales, terraces and wooded areas, shall be retained in order to reduce runoff and encourage
infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.
K. Septic Waste Disposal
18
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of Maine Subsurface
Wastewater Disposal Rules, and the following:
. a) clearing or removal of woody vegetation necessary to site a new system and any associated fill extensions,
shall not extend closer than seventy-five (75) feet, horizontal distance, from the normal high-water line of a
water body or the upland edge of a wetland and
b) a holding tank is not allowed for a first-time residential use in the shoreland zone.
(2) Setback requirements in the Halfmoon Pond District shall be no less than two hundred fifty (250) feet from
the normal high-water line of Halfmoon Pond.
L. Essential Services |
(1) Where feasible, the installation of essential services shall be limited to existing public ways and existing
service corridors.
(2) The installation of essential services, other than road-side distribution lines, is. not allowed ina Resource ~
Protection, Stream Protection District except to provide services to a permitted use within said district(s), or
except where the applicant demonstrates that no reasonable alternative exists. Where allowed, such structures
and facilities shall be located so as to minimize any adverse impacts on surrounding uses and resources,
including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related equipment may be
replaced or reconstructed without a permit,
M. Mineral Exploration and Extraction.
Mineral exploration to determine the nature or extent of mineral resources shall be accomplished by hand
sampling, test boring, or other methods which create minimal disturbance of less than one hundred (100) square
feet of ground surface, A permit from the Code Enforcement Officer shall be required for mineral exploration
which exceeds the above limitation. All excavations, including test pits and holes, shall be immediately capped,
filled or secured by other equally effective measures to restore disturbed areas and to protect the public health and
safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit is granted. Such
plan shall describe in detail procedures to be undertaken to fulfill the requirements of Section 15 (M)(4)
below.
(2) No part of any extraction operation, including.drainage and runoff control features, shall be permitted within
one hundred (100) feet, horizontal distance, of the normal high-water line of a great pond classified GPA or a
river flowing to a great pond classified GPA, and within seventy-five (75) feet, horizontal distance, of the
normal high-water line of any other water body, tributary stream, or the upland edge of a wetland. Extraction
operations shall not be permitted within fifty (50) feet, horizontal distance, of any property line without
written permission of the owner of such adjacent property.
(3) Developers of new gravel pits along Significant River Segments shall demonstrate that no reasonable mining
site outside the shoreland zone exists. When gravel pits must be located within the zone, they shall be set back
as far as practicable from the normal high-water line and no less than seventy-five (75) feet and screened from
the river by existing vegetation.
(4) Within twelve (12) months following the completion of extraction operations at any extraction site, which
operations shall be deemed complete when less than one hundred (100) cubic yards of materials are removed
in any consecutive twelve (12) month period, ground levels and grades shall be established in accordance with
the following:
19
(a) All debris, stumps, and similar material shall be removed for disposal in an approved location, or shall be
buried on-site, Only materials generated on-site may be buried or covered on-site.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be reseeded and stabilized
with vegetation native to the area. Additional topsoil or loam shall be obtained from off-site sources if
necessary to complete the stabilization project.
(5) In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions as are
necessary to minimize the adverse impacts associated with mineral extraction operations on surrounding uses
and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization Guidelines
published by the former Maine Department of Agriculture on November 1, 2001, and the Nutrient
Management Law (7 M.R.S.A. sections 4201-4209),
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,-of a great pond
classified GPA or a river flowing to a great pond classified GPA, or within seventy-five (75) feet horizontal
distance, of other water bodies, tributary streams, or wetlands. All manure Storage areas within the shoreland
zone must be constructed or modified such that the facility produces no discharge of effluent or contaminated
storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in surface area,
within the shoreland zone shall require a Conservation Plan to be filed with the Planning Board. Non-
conformance with the provisions of said plan shall be considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of the normal high-
water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance, from other water
bodies and coastal wetlands; nor within twenty-five (25) feet, horizontal distance, of tributary streams and
freshwater wetlands, Operations in existence on the effective date of this ordinance and not in conformance
with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100) feet, horizontal,
distance, of the normal high-water line of a great pond classified GPA; within seventy-five (75) feet, horizontal
distance, of other water bodies and coastal wetlands, nor; within twenty-five (25) feet, horizontal distance, of
tributary streams and freshwater wetlands. Livestock grazing associated with ongoing farm activities, and
which are not in conformance with the above setback provisions may continue, provided that such grazing is .
conducted in accordance with a Conservation Plan that has been filed with the planning board.
O-1. Timber Harvesting -- Repealed (Now regulated by Maine Forest Service)
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) Ina Resource Protection District abutting a great pond, there shall be no cutting of vegetation within the strip
of land extending seventy-five (75) feet, horizontal distance, inland from the normal high-water line, except to"
remove hazard trees as described in section Q <
20 ;
: Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be limited to that
which is necessary for uses expressly authorized in that district.
(2) Except in areas.as described in Section P(1), above, within a strip of land extending one-hundred (100) feet,
horizontal distance, inland from the normal high-water line of a great pond classified GPA or a river flowing
to a great pond classified GPA, or within a strip extending seventy-five (75) feet, horizontal distance, from
any other water body, tributary stream, or the upland edge of a wetland, a buffer strip of vegetation shall be
preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or other existing
woody vegetation if a forested canopy is not present) as measured from the outer limits of the tree 'or
shrub crown. However, a single footpath not to exceed six (6) feet in width as measured between tree
trunks and/or shrub stems is allowed for accessing the shoreline provided that a cleared line of sight to the
water through the buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-distributed stand of trees
and 'other natural vegetation is maintained. For the purposes of Section 15(P)(2)(b) a "well-distributed
stand of trees" adjacent to a great pond classified GPA or a river or stream flowing to a great pond
classified GPA, shall be defined as maintaining a rating score of 24-or more in each 25-foot by 50-foot
rectangular (1250 square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above Points
Ground Level (inches) ;
2-<4in. 1 .
4--<8 in. 2
8-< 12 in. 4
12 in. or greater 8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand of trees" is
defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot rectangular area.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner or lessee proposes
Clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed except as otherwise
allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to the minimum points
required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-foot rectangular area
may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining existing
vegetation under three (3) feet in height and other ground cover and retaining at least five (5) saplings less
than two (2) inches in diameter at four and one half (4 4) feet above ground level for each 25-foot by 50-
foot rectangle area. If five saplings do not exist, no woody stems less than two (2) inches in diametér can
be removed until 5 saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4) inches or
more in diameter, measured at 4 1/2 feet above ground level may be removed in any ten (10) year period.
2 | .
. {c) In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in height and
other ground cover, including leaf litter and the forest duff layer, shall not be cut, covered, or removed,
- except to provide for a footpath or other permitted uses as described in Section 15(P) paragraphs (2) and
(2)(a) above.
({d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, dead or hazard
trees results in the creation of cleared openings, these openings shall be replanted with native tree species
in accordance with Section Q, below, unless existing new tree growth is present. .
. () In order to maintain the vegetation in the shoreline buffer, clearing or removal of vegetation for allowed
; activities, including associated construction and related equipment operation, within or outside the
shoreline buffer, must comply with the requirements of Section 15 .P(2).
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond classified GPA ora
river flowing to a great pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of any other water body, tributary stream, or the upland edge of a wetland, there shali be
allowed on any lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the forty (40) percent calculation. For
the purposes of these standards volume may be considered to be equivalent to basal area,
In no event shall cleared openings for any purpose, including but not limited to, principal and accessory
' Structures, driveways, lawns and sewage disposal areas, exceed in the aggregate, 25% of the lot area within
the shoreland zone or ten thousand (10,000) square feet, whichever is greater, including land previously
cleared. This provision applies to the portion of a lot within the shoreland zone, including the buffer area, but
shall not apply to the General Development or Commercial Fisheries/Maritime Activities Districts.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be enlarged, except as
allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other woody vegetation
shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
(1) Hazard treés in the shoreland zone may be removed without a permit after consultation with the Code
Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in the tree canopy
greater than two hundred and fifty (250) square feet, replacement with native tree species is required,
unless there is new tree growth already present. New tree growth must be as near as practicable to where
: the hazard tree was removed and be at least two (2) inches in diameter, measured at four and one half
(4.5) feet above the ground level. If new growth is not present, then replacement trees shall consist of
native species and be at least four (4) feet in height, and be no less than two(2) inches in diameter.
Stumps may not be removed.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above
ground level in any ten (10) year period, and/or results in cleared openings exceeding twenty-five (25)
percent of the lot area within the shoreland zone, or ten thousand (10,000) Square feet, whichever is
greater, replacement with native tree species is required, unless there is new tree growth already present.
New tree growth must be as near as practicable to where the hazard tree was removed and be at least two
(2) inches in diameter, measured at four and one half (4.5) feet above the ground level. If new growth is
22 _ ,
not present, then replacement trees shal] consist of native species and be at least two (2) inches in
diameter, measured at four and one half (4.5) feet above the ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible without the need for
replanting or a permit, as long as the removal does not result in the creation of new lawn areas, orother _
permanently cleared areas, and stumps are not removed. For the purposes of this provision dead trees are
those trees that contain no foliage during the growing season.
(d) The Code Enforcement Officer may require the property owner to submit an evaluation from a licensed
forester or arborist before any hazard tree can be removed within the shoreland zone.
(ce) The Code Enforcement Officer may require more than a one-for-one replacement for hazard trees
removed that exceed eight (8) inches in diameter measured at four and one half (4.5) feet above the
ground level.
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after consultation with the Code
Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared opening in the
tree canopy greater than two hundred and fifty (250) square feet, replanting is not required, but the area
shall be required to naturally revegetate, and the following requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new lawn areas, or other
permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed:
(iii) Limbs damaged from a storm event may be pruned even if they extend beyond the bottom one-third
(1/3) of the tree; and
(iv) If after one growing season, no natural regeneration or regrowth is present, replanting of native tree
seedlings or saplings is required at a density of one seedling per every eighty (80) square feet of lost
canopy.
(b) Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of the volume of trees
four (4) inches or more in diameter, measured at four and one half (4.5) feet above the ground level in any
ten (10) year period, or results, in the aggregate, in cleared openings exceeding 25% of the lot area within
the shoreland zone or ten thousand (10,000) square feet, whichever is greater, and no natural regeneration
, occurs within one growing season, then native tree seedlings or saplings shall be replanted on a one-for-
one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
. The following activities are exempt from the clearing and vegetation removal standards set forth in Section 15(P),
provided that all other applicable requirements of this chapter are complied with, and the removal of vegetation is
limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the maintenance of legally existing
areas that do not comply with the vegetation standards in this chapter, such as but not limited to cleared
openings in the canopy or fields. Such areas shall not be enlarged, except as allowed by this section. If any of
these areas, due to lack of removal of vegetation every two (2) years, reverts back to primarily woody
vegetation, the requirements of Section 15(P) apply;
(2) The removal of vegetation from the location of allowed structures or allowed uses, when the shoreline setback
requirements of section 15(B) are not applicable;
23
(3) The removal of vegetation from the location of public swimming areas associated with an allowed public
recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best management practices are
utilized, and provided all requirements of section 15(N) are complied with;
(5) The removal of vegetation associated with brownfields or voluntary response action program (VRAP)
projects provided that the removal of vegetation is necessary for remediation activities to clean-up
contamination on a site in a general development district, commercial fisheries and maritime activities
district or other equivalent zoning district approved by the Commissioner that is part of a state or
federal brownfields program or a voluntary response action program pursuant 38 M.R.S.A section
343-E, and that is located along:
(a) A coastal. wetland; or
(b) A river that does not flow to a great pond classified as GPA pursuant to 38 M.R.S.A section 465-
A.
(6) The removal of non-native invasive vegetation species, provided the following minimum requirements are
met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled or tracked
motorized equipment is operated and stored at least twenty-five (25) feet, horizontal distance, from the
shoreline, except that wheeled or tracked equipment may be operated or stored on existing structural
surfaces, such as pavement or gravel:
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the shoreline occurs via
hand tools; and
(c) If applicable clearing and vegetation removal standards are exceeded due to the removal of non-native
invasive species vegetation, the area shall be revegetated with native species to achieve compliance.
(7) The removal of vegetation associated with emergency response activities conducted by the Department, the
U.S. Environmental Protection Agency, the U.S. Coast Guard, and their agents.
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in Section 15(P), to
address the removal of non- native invasive species of vegetation, or as a mechanism to allow for development
that may otherwise not be permissible due to the vegetation standards, including removal of vegetation in
conjunction with a shoreline stabilization project, the revegation must comply with the following requirements. ---
(1) The property owner must submit a revegetation plan, prepared with and signed by a qualified professional,
that describes revegetation activities and maintenance. The plan must include a scaled site plan, depicting
where vegetation was, or is to bé removed, where existing vegetation is to remain, and where vegetation is to
be planted, including a list of all vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area where Vegetation was
removed and at a density comparable to the pre-existing vegetation, except where a shoreline stabilization
activity does not allow revegetation to occur in the same area and at a density comparable to the pre-existing
vegetation, in which case revegetation must occur along the same segment of shoreline and as close as
possible to the area where vegetation was removed: .
24
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If the activity or
revegetation is not completed before the expiration of the permit, a new revegetation plan shall be submitted
with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must at a minimum consist of saplings;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different species shall be used;
, (d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to planttrees and
saplings in the same area where trees or saplings were removed, then trees or sapling must be planted ina
location that effectively reestablishes the screening between the shoreline and structures; and
(f) A survival rate of at least eighty (80) percent of planted trees or saplings is required for a minimum five
(5) years period.
(5) Revegetation activities must meet the following requirements for woody vegetation and other vegetation
under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced with native
noninvasive species of woody vegetation and vegetation under three (3) feet in height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in quantities and variety
sufficient to prevent erosion and provide for effective infiltration of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3) different species
shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody vegetation plants; and
(e) Survival of planted woody vegetation and vegetation under three feet in height must be sufficient to
remain in compliance with the standards contained within this chapter for minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native herbaceous vegetation, in
quantities and variety sufficient to prevent erosion and provide for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, an area must be supplemented with a minimum
four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion and provide for effective
infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to remain in
compliance with the standards contained within this chapter for minimum of five (5) years.
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which result in unstabilized
soil conditions and which require a permit shall also require a written soil erosion and sedimentation control
plan. The plan shall be submitted to the permitting authority for approval and shall include, where applicable,
provisions for:
(a) Mulching and revegetation of disturbed soil.
"25
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches. |
{c) Permanent stabilization structures such as retaining walls or rip-rap. --
(2) In order to create the least potential for erosion, development shall be designed to fit with the topography and
soils of the site, Areas of steep slopes where high cuts and fills may be required shall be avoided wherever
possible, and natural contours shall be followed as closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project involying land
disturbance, and shall be in operation during all stages of the activity. The amount of exposed soil at every
phase of construction shall be minimized to reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week from the time it
was last actively worked, by use of riprap, sod, seed, and mulch, or other effective measures. In all cases
permanent stabilization shall occur within nine (9) months of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at Jeast one (1) bale per five hundred (500) square feet
and shall be maintained until a catch of yegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be required to maintain
the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the water. Such
: measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion from water flowing
through them. Drainageways shall be designed and constructed in order to carry water from a twenty five (25)
year storm or greater, and shall be stabilized with vegetation or lined with riprap.
U. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can be established or
maintained without causing adverse environmental impacts, including severe erosion, mass soil movement,
improper drainage, and water pollution, whether during or after construction. Proposed uses requiring subsurface
waste disposal, and commercial of industrial development and other similar intensive land 'uses, shall require a
soils-report based on an on-site investigation and be prepared by state-certified professionals. Certified persons
may include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified ;
Geologists and other persons who have training and experience in the recognition.and evaluation of soil properties.
The report shall be based upon the analysis of the characteristics of the soil and surrounding land and water areas,
maximum ground water elevation, presence of ledge, drainage conditions, and other pertinent data which the
evaluator deems appropriate. The soils report shall include recommendations for a proposed use to counteract soil
limitations where they exist. oo
V. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the State any pollutant
, that, by itself or in combination with other activities or substances, will impair designated uses or the water
classification of the water body, tributary stream or wetland.
W. Archaeological Site. Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as determined by the
permitting authority, shall be submitted by the applicant to the Maine Historic Preservation Commission for
review and comment, at least twenty (20) days prior to action being taken by the permitting authority. The
permitting authority shall consider comments received from the Commission prior to rendering a decision on the
application.
SECTION 16, __ Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer, A Code Enforcement Officer shall be appointed or reappointed annually by July
Ist. .
26
(2) Board of Appeals. A Board of Appeals shail be created in accordance with the provisions of 30-A M.R.S.A.
section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first obtaining a permit,
engage in any activity or use of land or structure requiring a permit in the district in which such activity or use
would occur; or expand, change, or replace an existing Use or structure; or renew a discontinued nonconforming
use. A person who is issued a permit pursuant to this Ordinance shall have a copy of the permit on site while the
work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
{a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and the crossing does
not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is conducted by an
archaeologist listed on the State Historic Preservation Officer's level. 1 or level 2 approved list, and
unreasonable erosion and sedimentation is prevented by means of adequate and timely temporary and
permanent stabilization measures. ,
(3) Any permit required by this Ordinance shall be in addition to any other permit required by other law or
ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan, on a form
provided by the municipality, to the appropriate official as indicated in Section 14. The appropriate fee, as
determined by a fee schedule promulgated by the Municipal Officers upon Planning Board recommendation,
shall accompany said application.
(2) All applications shall be signed by an owner or individual who can show evidence of right, title or interest in
the property or by an agent, representative, tenant, or contractor of the owner with authorization from the
owner to apply for a permit hereunder, certifying that the information in the application is complete and
correct. ,
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as appropriate, shall
note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed application for a
; plumbing permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted
whenever the nature of the proposed stricture or use would require the installation of a subsurface sewage
disposal system.
(5) When an excavation contractor will perform an activity that requires or results in more than one (1) cubic yard .
of soil disturbance, the person responsible for management of erosion and sedimentation control practices at the
site must be certified in erosion control practices by the Maine Department of Environmental Protection. This
person must be present at the site each day earthmoving activity occurs for a duration that is sufficient to erisure
that proper erosion and sedimentation control practices are followed. This is required until erosion and
sedimentation control measures have been installed, which will either stay in place permanently or stay in place
until the area is sufficiently covered with vegetation necessary to prevent soil erosion. The name and
~ 27
certification number of the person who will oversee the activity causing or resulting in soil disturbance shall be
included on the permit application. This requirement does not apply to a person or firm engaged in agriculture
or timber harvesting if best management practices for erosion and sedimentation control are used; and
municipal, state and federal employees engaged in projects associated with that employment.
D. Procedure for Administering Permits. Within 35 days of the date of receiving a written application, the
Planning Board or Code Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing
either that the application is a complete application, or, if the application is incomplete, that specified additional
material is needed to make the application complete. The Planning Board or the Code Enforcement Officer, as
appropriate, shall approve, approve with conditions, or deny all permit applications in writing within 35 days of
receiving a completed application. However, if the Planning Board has a waiting list of applications, a decision on
the application shall occur within 35 days after the first available date on the Planning Board's agenda following
receipt of the completed application, or within 35 days of the public hearing, if the proposed use or structure is
found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in conformity with the
purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an application or
approve it with conditions if it makes a positive finding based on the information presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland and coastal waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will not adversely affect existing commercial fishing or maritime activities in a Commercial
Fisheries/Maritime Activities district;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be stated in
writing. No approval shall be granted for an application involving a structure if the structure would be located in
an unapproved subdivision or would violate any other local ordinance, or regulation or statute administered by the
municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential structure in a Resource
Protection District provided that the applicant demonstrates that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection District, where the
structure can be built, ,
(2) The lot on which the structure is proposed is undeveloped and was established and recorded in the régistry of
deeds of the county in which the lot is located before the adoption of the Resource Protection District. -
28
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100-year flood-plain along rivers and artificially formed great ponds
along rivers and outside the velocity zone in areas subject to tides, based on detailed flood insurance
studies and as delineated on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements, are elevated at least
one foot above the 100-year flood-plain elevation; and the development is otherwise in compliance with
any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is deemed to be
1/2 the width of the 100-year flood-plain.
(4) The total footprint, including cantilevered or similar overhanging extensions, of all principal and accessory
structures is limited to a maximum of 1,500 square feet. This limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal high-water line of
a water body, tributary stream or upland edge of a wetland to the greatest practical extent, but not less than 75
feet, horizontal distance. In determining the greatest practical extent, the Planning Board shall consider the
depth of the lot, the slope of the land, the potential for soil erosion, the type and amount of vegetation to be
removed, the proposed building site's elevation in regard to the flood-plain, and its proximity to moderate-
value and high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period, If a substantial start is made within one year of the
issuance of the permit, the applicant shall have one additional year to complete the project, at which time the
permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any utility company of any
kind may not install services to any new structure located in the shoreland zone unless written authorization
attesting to the validity and currency of all local permits required under this or any previous Ordinance has been
issued by the appropriate municipal officials or other written arrangements have been made between the municipal
officials and the utility,
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis, where it is
alleged by an aggrieved party that there is an error in any order, requirement, decision, or determination
made by, or failure to act by, the Planning Board in the administration of this Ordinance; and to hear and
. decide administrative appeals on a de novo basis where it is alleged by an aggrieved party that there is an
etror in any order, requirement, decision or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application under this Ordinance. Any
order, requirement, decision or determination made, or failure to act, in the enforcement of this ordinance is
not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited to, lot width,
structure height, percent of lot coverage, and setback requirements.
; 29
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the specific provision
which has created the non-conformity and from which relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship. The term "undue
hardship" shall mean:
: a. That the land in question cannot yield a reasonable return unless a variance is granted;
b. That the need for a variance is due to the unique circumstances of the property and not to the
general conditions in the neighborhood;
c. . That the granting of a variance will not alter the essential character of the locality; and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
' (qd) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals, or the codes enforcement officer if
authorized in accordance with 30-A MRSA §4353-A, may grant a variance to an owner of a residential
dwelling for the purpose of making that dwelling accessible to a person with a disability who resides in or
regularly uses the dwelling, The board shall restrict any variance granted under this subsection solely to the
installation of equipment or the construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose conditions on the variance, including
limiting the variance to the duration of the disability or to the time that the person with the disability lives in
the dwelling. The term "structures necessary for access to or egress from the dwelling" shall include railing,
wail or roof systems necessary for the safety or effectiveness of the structure. Any permit issued pursuant to
this subsection is subject to Sections 16(H)(2)(£) and 16(H)(4)(b)(iv) below.)
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to ensure
conformance with the purposes and provisions of this Ordinance to the greatest extent possible, and in
doing so may impose such conditions to a variance as it deems necessary. The party receiving the variance
shall comply with any conditions imposed. ©
(f) A copy of each variance request, including the application and all supporting information supplied by the
applicant, shall be forwarded by the municipal officials to the Commissioner of the Department of
Environmental Protection at least twenty (20) days prior to action by the Board of Appeals. Any comments
received from the Commissioner prior to the action by the Board of Appeals shall be made part of the
record and shall be taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of Appeals shall
hold a "de novo" hearing. At this time the Board may receive and consider new evidence and testimony, be it
, oral or written. When acting in a "de novo" capacity the Board of Appeals shall hear and decide the matter
afresh, undertaking its own independent analysis of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate hearing, and may
reverse the decision of the Planning Board only upon finding that the decision was contrary to specific
provisions of the Ordinance or contrary to the facts presented to the Planning Board. The Board of Appeals may
only review the record of the proceedings before the Planning Board. The Board Appeals shall not receive or
consider any evidence which was not presented to the Planning Board, but the Board of Appeals may receive
and consider written or oral arguments. If the Board of Appeals determines that the record of the Planning
Board proceedings are inadequate, the Board of Appeals may remand the matter to the Planning Board for
additional fact finding. .
30 |
(4) Appeal Procedure
| (a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved party from
any decision of the Code Enforcement Officer or the Planning Board, except for enforcement-related
. matters as described in Section 16(H)(1)(a) above. Such an appeal shall be taken within thirty (30) days
of the date of the official, written decision appealed from, and not otherwise, except that the Board,
upon a showing of good cause, may waive the thirty (30) day requirement.
Gi) Applications for appeals shall be made by filing with the Board of Appeals a written notice of appeal
which includes:
a. A concise written statement indicating what relief is requested and why the appeal or variance
should be granted. .
b. A sketch drawn to scale showing lot lines, location of existing buildings and structures and other
physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code Enforcement Officer
or Planning Board, as appropriate, shall transmit to the Board of Appeals all of the papers constituting
the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a request for a variance
within thirty-five (35) days of its receipt of a complete written application, unless this time period is
extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum for the purpose of
deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iti) The Board shall decide all administrative appeals and variance appeals within thirty five (35) days after
the close of the hearing, and shall issue a written decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a statement of the facts
found and conclusions reached by the Board. The Board shall cause written notice of its decision-to be
mailed or hand-delivered to the applicant and to the Department of Environmental Protection within
seven (7) days of the Board's decision. Copies of written decisions of the Board of Appeals shall be
given to the Planning Board, Code Enforcement Officer, and the municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take an appeal to Superior Court
in accordance with State laws within forty-five (45) days from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may reconsider
any decision within forty-five (45) days of its prior decision. A request to the Board to reconsider a decision a
must be filed within ten (10) days of the decision that is being reconsidered. A vote to reconsider and the action
taken on that reconsideration must occur and be completed within forty-five (45) days of the date of the Vote on
the original decision. Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner, petitioner, planning board,
code enforcement officer, and other parties of interest, including abutters and those who testified at the original ~
hearing(s). The Board may conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days after the decision on
reconsideration.
I. Enforcement 3
a 31 .
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance. If the
Code Enforcement Officer shall find that any provision of this Ordinance is being violated, he or she shall
notify in writing the person responsible for such violation, indicating the nature of the violation and
ordering the action necessary to correct it, including discontinuance of illegal use of land, buildings or
structures, or work being done, removal of illegal buildings or structures, and abatenient of nuisance
conditions, A copy of such notices shall be submitted to the municipal officers and be maintained as a
permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with all applicable
laws and conditions attached to permit approvals. The Code Enforcement Officer shall also investigate all
complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of the office,
including applications submitted, permits granted or denied, variances granted or denied, revocation
actions, revocation of permits, appeals, court actions, violations investigated, violations found, and fees
collected, ;
(3) Legal Actions. When the above action does not result in the correction or abatement of the violation or:
nuisance condition, the Municipal Officers, upon notice from the Code Enforcement Officer, are hereby
directed to institute any and all actions and proceedings, either legal or equitable, including seeking injunctions
of violations and the imposition of fines, that may be appropriate or necessary to enforce the provisions of this
Ordinance in the name of the municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not allow an illegal structure or use
to continue unless there is clear and convincing evidence that the illegal structure or use was constructed or
conducted as a direct result of erroneous advice given by an authorized municipal official and there is no
. evidence that the owner acted in bad faith, or unless the removal of the structure or use will result in a threat or
hazard to public health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a contractor, who violates
any provision or requirement of this Ordinance shall be penalized in accordance with 30-A, M.R.S.A. section
4452.
SECTION 17. _Definitions
For the purpose of this Ordinance, the following definitions shall be observed. All terms, not specifically defined
herein, shall have their ordinary or customary meanings. Words used in the present tense shall include the future
_ and the plural shall include the singular. ;
Accessory structure or use - a use of structure which is incidental and subordinate to the principal use or structure.
Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A deck or similar extension of the
principal structure or a garage attached to the principal structure by a roof or a common wall is considered part of the
principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or denial of a
permit or variance under this Ordinance; a person whose land abuts land for which a permit or variance has been
granted; or any other person or group of persons who have suffered particularized injury as a result of the granting or
denial of such permit or variance. .
32
Agriculture - the production, keeping or maintenance for sale or lease of plants or animals, including, but not limited
to, forages and sod crops, grains and seed crops, dairy animals and dairy products, poultry and poultry products,
livestock, fruits and vegetables and ornamental green-house products. Agriculture does not include forest management
and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more than 50% of its
volume below the existing ground level.
Boat Launching Facility -a facility designed primarily for the launching and landing of watercraft, and which may
include an access ramp, docking area, and parking spaces for vehicles and trailers,
Bureau of Forestry -- State of Maine Department of Agriculture, Conservation, and Forestry, Bureau of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living quarters,
including, but not limited to tents, recreational vehicles or other shelters.
Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
Cluster Housing Development -- a form of development for single-family residential subdivisions that permits a
reduction in lot area and other requirements, provided there is not an increase in the number of lots that would have
been permitted under a convential subdivision and the result land area is devoted to open space.
Coastal wetland - all tidal and subtidal Jands; all lands with vegetation present that is tolerant of salt water and occurs
primarily in a salt water or estuarine habitat; and any swamp, marsh, bog, beach, flat or other contiguous low land that
is subject to tidal action during the highest tide level for the year in which an activity is proposed as identified in tide
tables published by the National Ocean Service. Coastal wetlands may include portions of coastal sand dunes.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined below, the intent
and result of which activity is the production of income from the buying and selling of goods and/or services, exclusive
of rental of residential buildings and/or dwelling units.
Cross-sectional area -- the cross-sectional area of a stream or tributary stream channel is determined by multiplying
the stream or tributary stream channel width by the average stream or tributary stream channel depth. The stream or
tributary stream channel width is the straight line distance from the normal high-water line on one side of the channel
to the normal high-water line on the opposite side of the channel. The-average stream or tributary stream channel
depth is the average of the vertical distances from a straight line between the normal high-water lines of the stream or
tributary stream channel to the bottom of the channel.
; DBH -- the diameter of a stranding tree measured 4.5 feet from ground level.
Development --a change in land use involving alteration of the land, water or vegetation, or the addition or alteration
of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not limited to setback,
lot area, shore frontage and height. 7
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental condition caused by
bodily injury, accident, disease, birth defect, environmental conditions or illness; and also includes the physical or
mental condition of a person which constitutes a substantial handicap as determined by a physician or in the case of
33
mental handicap, by a psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the physical shape, properties, or condition of a shoreline at any
location by timber harvesting and related activities. A shoreline where shoreline integrity has been disrupted is
recognized by compacted, scarified and/or rutted soil, an abnormal channel or shoreline cross-section, and in the case
of flowing waters, a profile and character altered from natural conditions.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-family dwellings or
one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such as protection of
resources from immediate destruction or loss, law enforcement, and operations to rescue human beings, property and
livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water transmission or
distribution lines, towers and related equipment; telephone cables or lines, poles and related equipment; gas, oil,
water, slurry or other similar pipelines; municipal sewage lines, collection or supply systems; and associated storage
tanks. Such systems may include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police
call boxes, traffic signals, hydrants and similar accessories, but shall not include service drops or buildings which are
necessary for the furnishing of such services.
Expansion of a structure - an increase in the footprint of a structure, including all extensions such as, but not limited
to: attached decks, garages, porches and greenhotises.
Expansion of use - the addition of one or more months to a use's operating season; or the use of more footprint of a
structure or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
. Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved in order to
discharge the 100-year flood without cumulatively increasing the water surface elevation by more than one foot in
height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint - the entire area of ground covered by the structure(s) on a lot, including but not limited to cantilevered or similar
overhanging extensions, as well as unenclosed structures, such as patios and decks.
Forested wetland -- a freshwater wetland dominated by woodey vegetation that is six (6) meters tall (approximately twenty
(20) feet) or taller.
. Foundation - the supporting substructure of a building or other structure, excluding wooden sills and post supports, .
but including basements, slabs, frostwalls, or other base consisting of concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested wetlands, which are:
(1) Of ten or more contiguous acres; or of less'than 10 contiguous acres and adjacent to a surface water body,
excluding any river, stream or brook, such that in a natural state, the combined surface area is in excess of
10 acres; and
(2) inundated or saturated by surface or ground water at a frequency and for a duration sufficient to support,
and which under normal circumstances do support, a prevalence of wetland vegetation typically adapted
for life in saturated soils.
. 34
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the criteria of
this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on submerged larids
or that require direct access to, or location in, coastal or inland waters and that can not be located away from these -
waters. The uses include, but are not limited to, commercial and recreational fishing and boating facilities, finfish and
shellfish processing, fish-related storage and retail and wholesale fish marketing facilities, waterfront dock and port
facilities, shipyards and boat building facilities, marinas, navigation aids, basins and channels, shoreline structures
necessary for erosion control purposes, industrial uses dependent upon water-borne transportation or requiring large
volumes of cooling or processing water that can not reasonably be located or Operated at an inland site, and uses that.
primarily provide general public access to coastal or inland waters. Recreational boat storage buildings are not
considered to be a functionally water-dependent use.
Gray water -- A liquid waste discharge from any fixture, appliance or appurtenance in connection with a plumbing
system which does not receive or contain fecal matter. :
Great pond - any inland body of water which in a natural state has a surface area in excess of ten acres, and any
inland body of water artificially formed or increased which has a surface area in excess of thirty (30) acres except for
the purposes of this Ordinance, where the artificially formed or increased inland body of water is completely
surrounded by land held by a single owner.
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-A Section 465-A,
This classification includes some, but not all impoundments of rivers that are defined as great ponds.
Ground cover -- small plants, fallen leaves, needles and twigs, and the partially decayed organic matter of the forest
floor.
Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a structural defect that
under the normal range of environmental conditions at the site exhibits a high probability of failure and loss of a
major structural component of the tree in a manner that will strike a target. A normal range of environmental
conditions does not include meteorological anomalies, such as, but not limited to: hurricanes; hurricané-force winds;
tornados; microbursts; or significant ice storm events, Hazard trees also include those trees that pose a serious and
imminent risk to bank stability. A target is the area where personal injury or property damage could occur if the tree
. or a portion of the tree fails. Targets include roads, driveways, parking areas, structures, campsites, and any other
developed area where people frequently gather and linger.
Height of a structure - the vertical distance between the mean ori ginal (prior to construction) grade at the downhill
side of the structure and the highest point of the structure, excluding chimneys, steeples, antennas, and similar
appurtenances that have no floor area. ;
Home occupation - an occupation or profession which is customarily conducted on or in a residential structure or
property and which is 1) clearly incidental to and compatible with the residential use of the property and surrounding
residential uses; and 2) which employs no more than two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes further deviation
from the dimensional standard(s) creating the nonconformity such as, but not limited to, reduction in water body,
tributary stream or wetland setback distance, increase in lot coverage, or increase in height of a structure. Property
changes or structure expansions which either meet the dimensional standard or which cause no further increase in the
linear extent of nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies, wetlands, or tributary
streams if the expansion extends no further into the required setback area than does any portion of the existing --
nonconforming structure. Hence, a structure may be expanded laterally provided that the expansion extends no closer
to the water body, tributary stream, or wetland than the closest portion of the existing structure from that water body,
tributary stream, or wetland. Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which is developed for .
repeated camping by only one group not to exceed ten (10) individuals and which involves site improvements which
may include but not be limited to a gravel pad, parking area, fire place, of tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or the .
extraction of minerals.
Institutional ~ a non-profit or quasi-public use, or institution such as a church, library, public or private school,
hospital, or municipally owned or operated building, structure or land used for public purposes.
Licensed Forester -- a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal high-water line
of a water body or upland edge of a wetland and areas beneath roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use, providing for hire
offshore moorings or docking facilities for boats, and which may also provide accessory services such as boat and
related sales, boat repair and construction, indoor and outdoor storage of boats and marine equipment, bait and tackle
shops and marine fuel service facilities. .
- Market value - the estimated price a property will bring in the open market and under prevailing market conditions in
a sale between a willing seller and a willing buyer, both conversant with the property and with prevailing general
price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or extent of mineral
resources which create minimal disturbance to the land and which include reasonable measures to restore the land to
its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than one hundred
(100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material from its natural location
and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot lines extend into the
shoreland zone, both lot lines shal] be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling units.
Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure or use which is allowed solely because it was in lawful
existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which,.at the effective date of adoption or amendment of this Ordinance,
does not meet the area, frontage, or width requirements of the district in which it is located.
Non-conforming structure - a structure which does not meet any one or more of the following dimensional
requirements; setback, height, lot coverage or footprint, but which is allowed solely because it was in lawful existence
at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not allowed in the district
in which it is situated, but which is allowed to remain solely because it was in lawful existence at the time this
Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation - species of vegetation listed. by the Maine Department of Agriculture,
Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine ecosystems.
36
Normal high-water line (non-tidal waters) - that line which is apparent from visible markings, changes in the
. character of soils due to prolonged action of the water or changes in vegetation, and which distinguishes between
predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers and great ponds that support
non-forested wetland vegetation and hydric soils and that are at the same or lower elevation as the water level of the
river or great pond during the period of normal high-water are considered part of the river or great pond.
Outlet stream - any perennial or intermittent stream, as shown on the most recent highest resolution version of the
national hydrography dataset available from the United States Geological Survey on the website of the United States
Geological Survey or the national map, that flows from a freshwater wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership, association, two or
more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the normal high-water line
. or within a wetland.
Temporary: Structures which remain in or over the water for less than seven (7) months in any period of
twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or more in any period of
twelve (12) consecutive months.
Principal structure -- a structure other than one which is used for purposes wholly incidental or accessory to the use
of another structure or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another use on the same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and roads, which are -
owned, leased, or otherwise operated, or funded by a governmental body or public entity.
Recent floodplain soils - the following soil series as described and identified by the National Cooperative Soil
Survey:
Fryeburg Hadley Limerick
Lovewell Medomak Ondawa
Alluvial Cornish Charles
Podunk Rumney Saco
Suncook Sunday Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time activities, and other
customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for temporary
sleeping or living quarters for one or more persons, and which may include a pick-up camper, travel trailer, tent
trailer, camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit must
remain with its tires on the ground, and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either malfunctioning or being
upgraded with no significant change of design flow or use of the structure, or 2.) any existing overboard wastewater
discharge,
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as permanent, -
Seasonal, or temporary living quarters for only one family at a time, and containing cooking, sleeping and toilet
37
facilities. The term shall include mobile homes and rental units that contain cooking, sleeping, and toilet facilities
regardless of the time-period rented. Recreational vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least:six (6) inches in diameter, used for erosion control and soil
stabilization, typically. used on ground slopes of two (2) units horizontal to one (1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point at which it provides
drainage for a watershed of twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing material
constructed for or created by the repeated passage of motorized vehicles, excluding a driveway as defined.
Salt marsh - Areas of coastal wetland (most often along coastal bays) that support salt tolerant species, and where at
average high tide during the growing season, the soil is irregularly inundated by tidal waters. The predominant species
is saltmarsh cordgrass (Spartina alterniflora). More open areas often support widgeon grass, eelgrass, and Sago
pondweed.
Salt meadow - Areas of a coastal wetland that support salt tolerant plant species bordering the landward side of salt
marshes or open coastal water, where the soil is saturated during the growing season but which is rarely inundated by
tidal water. Indigenous plant species include salt meadow cordgrass (Spartina patens) and black rush; common
threesquare occurs in fresher areas.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above ground level.
Service drop - any utility line extension which does not cross or run beneath any portion of a water body provided
that:
(1) in the case of electric service
(a) the placement of wires and/or the installation of utility poles is located entirely upon the premises of the
customer requesting service or upon a roadway right-of-way; and
(b) the total length of the extension is less than one thousand (1,000) feet.
(2) in the case of telephone service .
(a) the extension, regardless of length, will be made by the installation of telephone wires to existing utility
poles, or '
(b) the extension requiring the installation of new utility poles or placement underground is less than Gne
thousand (1,000) feet in length. .
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary stream, or
upland edge of a wetland, to the nearest part of a structure, road, parking space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line between the
intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance, of the normal
high-water line of any great pond or river; within 250 feet, horizontal distance, of the upland edge of a coastal
wetland, including all areas affected by tidal action; within 250 feet of the upland edge of a freshwater wetland: or
within seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream.
38
'Shoreline -- the normal high-water line, or upland edge of a freshwater or coastal wetland.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or that remains standing
and is damaged beyond the point of recovery as the result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2) perennial streams
as depicted on the most recent, highest resolution version of the national hydrography dataset available from the
United States Geological Survey on the website of the United States Geological Survey or the national map to the
point where the stream becomes a river or where the stream meets the shoreland zone of another water body or
wetland. When a stream meets the shoreland zone of a water body or wetland and a channel forms downstream of the
water body or wetland as an outlet, that channel is also a stream.
. Structure ~ anything temporarily or permanently located, built, constructed or erected for the support, shelter or
enclosure of persons, animals, goods or property of any kind or anything constructed or erected on or in the ground.
The term includes structures temporarily or permanently located, such as decks, patios, and satellite dishes. Structure
does not include fences; poles and wiring and other aerial equipment normally associated with service drops,
including guy wires and guy anchors; subsurface waste water disposal systems as defined in Title 30-A, section 4201,
subsection 5; geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection 3-C; or wells or water
wells as defined in Title 32, section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a percentage of
estimated total cost.
Subsurface sewage disposal system -- any system designed to dispose of waste or waste water on or beneath the
surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools; holding
tanks; pretreatment filter, piping, or any other fixture, mechanism, or apparatus used for those purposes; does not
include any discharge system licensed under 38 M.R.S.A. section 414, any surface waste water disposal system, or
any municipal or quasi-municipal sewer or waste water treatment system..
Sustained slope - a change in elevation where the referenced percent grade is substantially maintained or exceeded
throughout the measured area.
Tidal waters -- all waters affected by tidal action during the highest annual tide.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four and one half
(4.5) feet above the ground, with a more or Jess definite crown, and reaching a height of at least ten (10) feet at
maturity.
Tributary stream -- means a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing waterborne
deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with other water,bodies.
"Tributary stream" does not include rills or gullies forming because of accelerated erosion in disturbed soils where the
natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies to that
portion of the tributary stream located within the shoreland zone of the receiving water body or wetland.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a coastal wetland, this
boundary is the line formed by the landward limits of the salt tolerant vegetation and/or the highest annual tide level,
including all areas affected by tidal action. For purposes of a freshwater wetland, the upland edge is formed where the
soils are not saturated for a duration sufficient to support wetland vegetation; or where the soils support the growth of
wetland vegetation, but such vegetation is dominated by woody stems that are six (6) meters (approximately twenty
(20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over and under 4 inches in
diameter, measured at 4 1/2 feet above ground level.
39
._ Velocity zone - an area of special flood hazard extending from offshore to the inland limit of the primary frontal dine
along an open coast and any other area subject to high velocity wave action from storms or seismic sources.
Volume of a structure.- the volume of all portions of a structure enclosed by roof and fixed exterior walls as
measured from the exterior faces of these walls and roof. ,
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream, tributary stream, or
wetland whether under, through, or over the water or wetland. Such projects include but may not be limited to roads,
fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these crossings. This
definition includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater or coastal wetland.
Windfirm - the ability of a forest stand to withstand strong winds and resist windthrow, wind rocking, and major
breakage.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
Sanne
STATUTORY AUTHORITY: 38 M.R.S.A. Section 438-A(5)
EFFECTIVE DATE:
March 16, 1991
AMENDED:
March 11, 2000 (Town Meeting)
July 13, 2000 (Special Town Meeting)
March 7, 2009 (Town Meeting)
March 10, 2012 (Town Meeting)
March 5, 2016 (Town Meeting)
March 11, 2017 (Town Meeting)
Amended at the Town Meeting on March 11, 2017
This is a true and attested copy by: -- Dhrdr Phurcto
Deborah Plourde, Town Clerk
40 cee