WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
1.00 Titles. eee cece eee e sees. Page 2
3.0 9 Purpose... eee eee eee eeeeees . Page 2
4.0 Definitions... 0... eee eee ee ee esses. Page 2
5.0 Applicability... 0. eee eee eee ees. Page 5
6.0 Conflict and Severability... 0.00.00... 00.00.00 .00000200..... Page 5
7.0 Effective Date... cece cence neces es Page 6
8.0 Classification of Wind Energy Facilities......................... Page 6
9.0 Administration. ...... 0.00. ee eee eee eee e ee ss Page 6
10.0 Application Submission Requirements.......................... Page I
11.0 Meteorological Towers (MET Towers) .......................4. Page 14
12.0 General Standards ..... 00.00.0000 eee eee eee eee eee. Page 14
13.0 Special Standards for Type 1A and 1B Wind Energy Facilities ....... Page 17
14.0 Special Standards for Type 2 and Type 3 Wind Energy Facilities . . ..... Page 19
Appendix A: Application Fees... 2.0... eee eee eee eee. Page 23
Appendix B: Type 2 and Type 3 Noise Control Standards .................. Page 24
Appendix C: Type 2 and Type 3 Decommissioning Plan Standards ......... . Page 37
I
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
1.0 ~ Title
This Ordinance shall be known as the Wind Energy Facility Ordinance for the Town of
Searsport, Maine.
2.0 -- Authority
This Ordinance is adopted pursuant to the enabling provisions of Article VIII, Part 2, Section
lof the Maine Constitution; the provisions of 30-A M.R.S. 3001 (Home Rule), and the
provisions of the Planning and Land Use Regulation Act, 30-A M.R.S. 4312 et. seg.
3.0 ~ Purpose
The purpose of the Ordinance is to provide for the construction and operation of Wind Energy
Facilities in Searsport, Maine, subject to reasonable conditions that will protect the public
health, safety, and welfare.
4.0 -- Definitions
Disclaimer -- These definitions apply to this ordinance only.
Applicant is the legal entity, including successors and assigns, that files an application under
this Ordinance.
Approved Residential Subdivision means a residential subdivision for which all applicable
land use permits have been issued, provided that the time for beginning construction under such
permits has not expired.
Associated Facilities means elements of a Wind Energy Facility other than its Generating
Facilities that are necessary to the proper operation and maintenance of the Wind Energy
Facility, including but not limited to buildings, access roads, Generator Lead Lines and
substations.
DEP Certification means a certification issued by the Department of Environmental Protection
pursuant to 35-A M.R.S. 3456 for a Wind Energy Development.
Generating Facilities means Wind Turbines and electrical lines, not including Generator Lead
Lines, that are immediately associated with the Wind Turbines.
Generator Lead Line means a "generator interconnection transmission facility" as defined by
35-A M.R.S. 3132 (1-B).
Historic Area means an Historic Site administered by the Bureau of Parks and Recreation of the
Maine Department of Conservation, with the exception of the Arnold Trail.
Historic Site means any site, structure, district, or archaeological site which has been officially
included on the National Register of Historic Places and/or on the Maine Historic Resource
Inventory, or which is established by qualified testimony as being of historic significance>
2
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
Locally-Designated Passive Recreation Area means any site or area designated by a
municipality for passive recreation that is open and maintained for public use and which;
a) has fixed boundaries, b) is owned by the municipality or 1s accessible by virtue of
public easement, c) is identified and described in a local comprehensive plan and, d) has been
and designated at least nine months prior to the submission of the Applicants Wind
Energy Facility permit application.
Meteorological Tower (MET Tower) means a Tower used for the measurement and collection
of wind data that supports various types of equipment, including but not limited to anemometers,
data recorders, and solar power panels. MET Towers may also include wildlife related
equipment such as ANABAT detectors, bird diverts, and wildlife entanglement protectors.
Municipal Reviewing Authority means the municipal planning board, agency or office, or if
none, the municipal officers.
Nacelle means the frame and housing at the top of the Tower that encloses the gearbox and
generator.
Non-Participating Landowner means any landowner, other than a Participating Landowner
whose land is located within Searsport.
Occupied Building means a residence, school, hospital, house of worship, public library or other
building that is occupied or in use as a primary residence or is customarily frequented by the
public at the time when the permit application is submitted.
Participating Landowner means one or more Persons that hold title in fee or a leasehold
interest with sublease rights to property on which Generating Facilities or Associated Facilities
are proposed to be located pursuant to an agreement with the Applicant or an entity that has
entered into an appropriate agreement with the Applicant allowing the Applicant to demonstrate
the requisite right, title and interest in such property.
Person means an individual, corporation, partnership, firm, organization or other legal entity.
Planned Residence means a Residence for which all applicable building and land use permits
have been issued, provided that the time for beginning construction under such permits has not
expired.
Protected Location means any location that is:
|) accessible by foot, on a parcel of land owned by a Non-Participating Landowner containing
a residence or planned residence, or an approved residential subdivision, house of worship,
academic school, college, library, duly licensed hospital or nursing home near the
development site at the time an application for a Wind Energy Facility is submitted under
this Ordinance;
2) within a State Park, Baxter State Park, a National Park, a nature preserve owned by a land
3
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
trust, the Maine Audubon Society or the Maine chapter of the Nature Conservancy, the
Appalachian Trail, the Moosehorn National Wildlife Refuge, a federally designated wilderness
area, a state wilderness area designated by statute, a municipal park or a locally-designated
passive recreation area, or any location within consolidated public reserve lands designated
by rule by the Bureau of Public Lands as a Protected Location, or,
3) a hotel, motel, campsite, or duly licensed campground that the municipal authority
responsible for review and approval of the pending application under 9.1 has designated a
Protected Location after making a determination that the health and welfare of the guests or
the economic viability of the establishment will be unreasonably impacted by noise in excess
of that allowed under Section 13.1.3(b).
Residence means a building or structure, including manufactured housing, maintained for
permanent or seasonal residence occupancy providing living, cooking and sleeping facilities and
having permanent indoor or outdoor sanitary facilities, excluding recreational vehicles, tents and
watercraft.
Scenic Resource means either a Scenic Resource of state or national significance, as defined in
35-A M.R.S. 3451(9) or a scenic resource of local significance located within the municipality
and identified as such in a comprehensive plan, open space plan or scenic inventory adopted by
the municipal legislative body.
Shadow Flicker means alternating changes in light intensity caused by the movement of Wind
Turbine blades casting shadows on the ground or a stationary object.
Short Duration Repetitive Sounds means sequence of repetitive sounds which occur more than
once within an hour, each clearly discernible as an event and causing an increase in the sound
level of at least 6 dBA on the fast meter response above the sound level observed immediately
before and after the event, each typically less than ten seconds in duration, and which are
inherent to the process or operation of the development and are foreseeable.
Sight Line Representation means a profile drawing showing prominent features, including but
not limited to topography, buildings, and trees, along and in relation to a line of sight extending
from an observer's eye to the lowest point visible on a proposed Tower.
Significant Wildlife Habitat means a Significant Wildlife habitat as defined in 38 M.R.S.
480-b(10).
Substantial Start means that construction shall be considered to be substantially commenced
when any work beyond excavation, including but not limited to, the pouring of a slab or footings.
The installation of piles, the construction of columns, or the placement of a Tower on a
foundation has begun.
Tower means the free-standing structure on which a wind measuring or energy conversion
system 1s mounted.
4
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
Turbine Height means the distance measured from the surtace of the Tower foundation to the
highest point of any turbine rotor blade measured at the highest arc of the blade.
Wind Energy Facility means a facility that uses one or more Wind Turbines to convert wind
energy to electrical energy. A Wind Energy Facility includes Generating Facilities and
Associated Facilities.
Wind Energy Facility, Type LA means a Wind Energy Facility having a maximum generating
capacity of less than 100kW, a maximum of one Wind Turbine and a maximum Turbine Height
of 80 feet.
Wind Energy Facility, Type LB means a Wind Energy Facility having a maximum generating
capacity of less than 100k W and either more than one Wind Turbine, or one or more Wind
Turbines with a Turbine Height greater than 80 feet.
Wind Energy Facility, Type 2 means a Wind Energy Facility having a maximum generating
capacity of 100kW or greater and which does not require a state permit issued by the
Department of Environmental Protection under the Site Location of Development Act,
38 M.R.S. 481, et seg.
Wind Energy Facility, Type 3 means a Wind Energy Facility having a generating capacity of
100kW or greater and which requires a state permit issued by the Department of Environmental
Protection under the Site Location of Development Act, 38 M.R.S. 481, et seq.
Wind Turbine means a system for the conversion of wind energy into electricity which is
comprised of a Tower, generator, Nacelle, rotor and transformer.
5.0 Applicability
This Ordinance applies to any Wind Energy Facility proposed for construction in Searsport,
Maine after the effective date of this Ordinance. This Ordinance does not apply to Associated
Facilities unless the Generating Facilities are located within Searsport, Maine, in which case
this Ordinance applies to both the Generating Facilities and the Associated Facilities.
5.1 -- A Wind Energy Facility that is the subject of an application determined to be complete
by the Searsport Planning Board prior to the effective date of this Ordinance shall not be
required to meet the requirements of this Ordinance; provided that any physical modifications
after the effective date of the Ordinance shall be subject to the permitting requirements of
Section 9.2.
6.0 Conflict and Severability
6.1 -- If there is a conflict between provisions in this Ordinance, the more stringent shall apply. If
there is a conflict between a provision in this Ordinance and that of another Town of Searsport
Ordinance, the provision of this ordinance shall apply.
5
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
6.2 ~ The invalidity of any part of this Ordinance shall not invalidate any other part of this
Ordinance.
7.0 Effective Date
This Ordinance becomes effective on March 10, 2012.
8.0 Classification of Wind Energy Facilities
All Wind Energy Facilities shall be classified in accordance with Table 1, below:
Table 1: Classification of Wind Energy Facilities and Corresponding Local
Review and Approval Authority
| 'Facility Type | Aggregate | Turbine Max#of DEP Site Location | Local Review and |
| _ Capacity Height Turbines Permit Required | Approval |
| 1A | < 100kW | > or = 80 ft. | l | No | Code Enforcement |
| | Officer |
1B | <100kW > 80 ft. = NA No | Searsport Planning |
| | | | Board
2 ->or=100kW = NA ONA No (1) _ Searsport Planning
| | Board
3 | > or = 100kW NA | NA | Yes (2) | Searsport Planning
| | | Board
(1) Per 35-A M.R.S. 3456. DEP Certification required if energy generated is for sale or use
by a Person other than the generator.
(2) Per 38 M.R.S. 482 (2)
9.0 Administration
9.1 -- Review and Approval Authority
1. The Code Enforcement Officer is authorized to review all applications for Type 1A
Wind Energy Facilities and MET Towers pursuant to Section 11.0, and may approve,
deny or approve such applications with conditions in accordance with the standards of
this Ordinance.
2. The Searsport Planning Board is authorized to review all applications for Type 1B,
Type 2, and Type 3 Wind Energy Facilities and may approve, deny, or approve
such applications with conditions in accordance with this Ordinance.
9,2 -- Permit Required
6
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
|. No Wind Energy Facility shall be constructed or located within the Town of
Searsport without a permit issued in accordance with this Ordinance.
2. Any physical modification to an existing Wind Energy Facility that materially
alters the location or increases the area of development on the site or that
increases the Turbine Height or the level of sound emissions of any Wind
Turbine shall require a permit modification under this Ordinance. Like-kind
replacements and routine maintenance and repairs shall not require a permit modification.
9.3 -- Permit Applications
1. Application components. A Wind Energy Facility permit application shall
consist of the application form, application fee, and supporting document
as described below:
a. Application Forms. The municipality shall provide the application form
which shall be signed by: 1) a Person with right, title and interest in the
subject property or; 2) a Person having written authorization from a Person
with right, title and interest in the subject property. The signature shall be
dated and the signatory shall certify that the information in the application is
complete and correct and that the proposed facility ill be constructed and
operated in accordance with the standards of this Ordinance and all approval
and permit conditions, if any.
b. Application Fees: Application fees shall be assessed and paid upon
submission of the application in accordance with Appendix A of the Ordinance.
c. Supporting Documents: The application shall include all additional
documents necessary to satisfy the applicable submission requirements
under Section 10 of this Ordinance.
2. Application Submission. The Applicant shall submit its application for a Wind Energy
Facility permit to the Chair of the Searsport Planning Board, who shall note on the
application the date on which it was received.
3. Changes to a Pending Application. If changes are proposed to a pending application
after a public hearing has been held, the Searsport Planning Board may consider those
changes and continue with the review and approval process without a renewed public
hearing if it determines that the changes do not materially alter the application. If the
Searsport Planning Board determines that the proposed changes do materially alter the
application it shall schedule and conduct another public hearing within 30 days of that
determination. In making its determination, the Searsport Planning Board shall
consider whether the proposed changes involve potential adverse effects different than
or in addition to those addressed in the initial application.
7
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
9.4 -- Permit Application Procedures
|. Type 1A Wind Energy Facility Application
a. Within 10 days after receiving an application, the Code Enforcement Officer
shall notify the Applicant in writing either that the application is complete or, if the
application is incomplete, the specific additional material needed to complete the
application. The Code Enforcement officer may waive any submission
requirement if the Code Enforcement Officer issues a written finding that, due to
special circumstances of the application, adherence to that requirement is not
necessary to determine compliance with the standards of the Ordinance.
b. Within 30 days after determining the application to be complete, the Code
Enforcement Officer shall issue a written order: 1) denying approval of the
proposed Wind Energy Facility, 2) granting approval of the proposed Wind Energy
Facility or, 3) granting approval of the proposed Wind Energy Facility with
conditions. In making the decision, the Code Enforcement Officer shall make
findings on whether the proposed Wind Energy Facility meets the applicable
criteria described in Sections 12 and 13.
c. With the agreement of the applicant, the Code Enforcement Officer
may extend the procedural time frames of this section.
2. Type 1B, Type 2 and Type 3 Wind Energy Facility Applications
a. The Applicant is strongly encouraged to meet with the Chair of the Searsport
Planning Board before submitting an application. At this pre-application meeting,
the Chair of the Searsport Planning Board will explain the Ordinance's provisions,
application forms, and submission requirements. The Applicant should provide photos
of the proposed site and written descriptions of the proposed facility and the
proposed site, including it's location and lot area.
b. An applicant shall be eligible for consideration at a regularly-schedule meeting
of the Searsport Planning Board only if the applicant submits it at least 14 days
prior to the meeting.
c. Within 30 days after receipt of the application by the Chair of the Searsport Planning
Board, the Searsport Planning Board shall notify the Applicant in writing either that
the application is complete or, if the application is incomplete, the specific
additional material needed to complete the application. The Searsport Planning
Board may waive any submission requirement if it issues a written finding that,
due to special circumstances of the application, adherence to that requirement is
not necessary to determine compliance with the standards of this Ordinance.
_ d. The Searsport Planning Board shall hold a public hearing for a Type 3 Wind
Energy Facility application within 60 days after determining that the application is
8
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
complete. The Searsport Planning Board may decide to hold a public hearing
for a Type 1B or a Type 2 Wind Energy Facility application. If it decides to hold a
public hearing for a Type 1B application, the Searsport Planning Board shall
hold that hearing within 30 days after determining that application is complete. If it
decides to hold a public hearing for a Type 2 application, the Searsport Planning
Board shall hold that hearing within 60 days after determining the the application
is complete.
e. Within 60 days after determining that an application for a Type 1B Wind Energy
Facility is complete or within 90 days after determining that an application for a
Type 2 or Type 3 Wind Energy Facility is complete, the Searsport Planning
Board shall issue a writte3n order: 1) denying approval of the proposed Wind
Energy Facility, 2) granting approval of the proposed Wind Energy Facility or, 3)
granting approval of the proposed Wind Energy Facility with conditions. In making
it's decision, the Searsport Planning Board shall make findings on whether the
proposed Wind Energy Facility meets the applicable criteria described in
Sections 12, 13 and 14.
f. With the agreement of the Applicant, the Searsport Planning Board may
extend the procedural time frame of this section.
Table 2
Procedural Time Frames
Facility Type 7 "Application Completeness | Public Hearing | : Final Decision
1A | < or = 10 days (1) | NA | <or=30 days (2)
1B <or = 30 days (1) < or = 30 days (2) | < or = 60 days (2)
| 2 -- <or=30days(1) = <or=60days(2)-- < or = 90 days (2)
| 3 | <or = 30 days (1) < or = 60 days (2) | <or = 90 days (2) |
(1) Days after the receipt of the application by the Chair of the Searsport Planning Board
(2) Days after the application is determined to be complete
9.5 ~ Notice of Meetings
Fourteen days (14) prior to any meetings at which an application for a Type 1B, Type 2<
or Type 3 Wind Energy Facility is to be considered, the Searsport Planning Board shall
send notice by first class mail, to the applicant and all owners of property abutting the
property on which the Wind Energy Facility is proposed to be located. The notice shall state
the date, time, and place of meeting and the proposed location and classification of the
proposed Wind Energy Facility.
9.6 -- Public Hearings
The Searsport Planning Board shall have notice of the date, time, and place of any
9
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
public hearing and the proposed location and the classification of the proposed Wind
Energy facility:
|. Published at least once in a newspaper having general circulation within the
municipality. The date of the first publication shall be at least 10 days before the hearing.
2. Mailed by first class mail to the Applicant and to owners of property within 500 feet
of the property on which the Wind Energy Facility is proposed to be located, at least
10 days before the public hearing. The Searsport Planning Board shall maintain a list of
property owners to whom notice is mailed in the application file. Failure of any of these
property owners to receive a notice shall not invalidate the public hearing, nor shall it
require the Searsport Planning Board to schedule another hearing.
9.7 -- Professional Services
In reviewing the application for compliance with this Ordinance, the Searsport Planning Board
may retain professional services, including but not limited to those of an attorney or
consultant, to verify information presented by the Applicant. The attorney or consultant shall
first estimate the reasonable cost of such review and the Applicant shall deposit, with the
municipality, the full estimated cost, which the municipality shall place in an escrow account.
The municipality shall pay the attorney or consultant from the escrow account and reimburse
the Applicant if funds remain after the payment.
9.8 -- Expiration of Permits
Permits shall expire: 1) two years after the date of approval unless a substantial start on
construction has occurred and; 2) three years after the date of approval unless construction
of the Wind Energy Facility has been completed. If a permit for a Type 2 or Type 3 Wind
Energy Facility expires, the Applicant shall implement pertinent provisions of the approved
decommissioning plan. Upon the Applicant's written request, the municipal entity responsible
for review and approval of the application under Section 9.1 may extend either or both
expiration time limits by one year.
9.9 -- Access
The Code Enforcement Officer shall have access to the site at all times to review the
progress of the work and shall have the authority to review all records and documents directly
related to the design, construction and operation of the facility.
9.10 -- Enforcement
1. It shall be unlawful for any Person to violate or fail to comply with or take any action
that is contrary to the terms of the Ordinance, or to violate or fail to comply with any
permit issued under the Ordinance, or to cause another to violate or fail to comply or
take any action which is contrary to the terms of the Ordinance or any permit under the
Ordinance.
10
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
2. If the Code Enforcement Officer or other Person charged with enforcement of
municipal laws determines that a violation of the Ordinance or the permit has occurred
the Code Enforcement Officer shall provide written notice to any Person alleged to be
in violation of this Ordinance or permit. If the alleged violation does not pose an immediate
threat to public health or safety, the Code Enforcement Officer and the
alleged violator shall engage in good faith negotiations to resolve the alleged violation.
Such negotiations shall be conducted within thirty (30) days of the notice of violation
and, with the consent of the alleged violator, may be extended.
If, after thirty (30) days from the date of notice of violation or further period as agreed
to by the alleged violator, the Code Enforcement Officer determines, in the officer's
reasonable discretion, that the parties have not resolved the alleged violation, the
Code Enforcement Officer may institute civil enforcement proceedings or any other
remedy at law to ensure compliance with the Ordinance or permit.
9.11 ~ Appeals
An aggrieved party may appeal any decision of the Board under this Ordinance to the Waldo
County Superior Court, within thirty days of the date the Board issues a written order of its
decision, in accordance with Rule 80B of Maine Rules of Court.
10.0 -- Application Submission Requirements
| --A completed application form including:
a. The Applicant and Participating Landowner(s) name(s) and contact information.
b. The address, tax map number, zone and owner(s) of the proposed facility site and
any contiguous parcels owned by the Participating Landowners.
c. The tax map number, zone, current use, owner(s) and addresses of owner(s) of
parcels that abut the proposed facility site or abut parcels of Participating
Landowners that are contiguous with the proposed facility site, and of parcels
within 500 feet of the proposed facility. (Not required for Type 1A applications)
d. An affirmation, signed and dated by the Applicant, that the information provided in
the application is correct and that the proposed Wind Energy Facility, if approved
and built, shall be constructed and operated in accordance with the standards of
this Ordinance and all conditions of approval, if any.
2 ~ Receipt showing payment of application fee in accordance with the Town of Searsport
Land Use Permit Fee Schedule.
3 ~A copy of a deed, easement, purchase option or other comparable documentation
demonstrating that the Applicant has right, title or interest in the proposed facility site.
11
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
4 ~ Location map showing the boundaries of the proposed facility site and all contiguous
property under the total or partial control of the Applicant or Participating Landowner(s)
and any Scenic Resource or Historic Site within 2,500 feet of the proposed development.
5 ~ Description of the proposed Wind Energy Facility that includes the number and
aggregate generating capacity of all Wind Turbines, The Turbine Height and
manufacturer's specifications for each Wind Turbine (including but not limited to the
make. Model, maximum generating capacity, sound emission levels and types of
overspeed control(s) and a description of Associated Facilities 6 -- Site plan showing the
proposed location of each Wind Turbine and Associated Facilities and any of the following
features located within 500 feet of any Wind Turbine parcel boundaries, required setbacks,
topographic contour lines (maximum 20-foot interval), roads, rights-of-way, overhead utility
lines, buildings (identified by use), land cover, wetlands, streams, water bodies and areas
proposed to be re-graded or cleared of vegetation.
a. In addition to the information in 6, above, site plans for Type 1B, Type 2 and Type 3
Wind Energy Facilities shall show the location and average height of tree cover to
be retained and the location, variety, planting height and mature height of proposed
trees, if any.
7 -- Written comments from the Environmental Coordinator of the Maine Department of
Inland Fisheries and Wildlife (MDIFW) and the Maine Natural Area Program (MNAP).
8 ~ Written evidence that the provider of electrical service to the property has been notified
of the intent to connect an electric generator to the electricity grid, if such connection
is proposed.
9 -- Description of emergency and normal shutdown procedures.
10 -- Photographs of existing conditions at the site.
11 -- An application for a Type 1A or 1B Wind Energy Facility shall include structural
drawings of the Tower foundation and anchoring system: a) prepared by the Wind
Turbine or Tower manufacturer, b) prepared in accordance with the manufacturer's
specifications or, c) prepared and stamped by a Maine-licensed professional engineer.
12 --An application for a Type 1A or Type 1B Wind Energy Facility shall include:
a. A written statement, signed by the Applicant, that certifies that the proposed facility
is designed to meet the applicable noise control standards under Section 13.1.3
and acknowledges the Applicant's obligation to take remedial action in accordance
with Section 13.1.6 if the authority having jurisdiction determines those standards
are not being met, or;
b. A written request to review under Section 14.1 along with information required
12
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
under Appendix B, subsection B (Submissions).
13 ~An Application for a Type 1B, Type 2 or Type 3 Wind Energy Facility shall include the
following site line, photographic and, if applicable, screening information, provided that an
Applicant for a Type 3 Wind Energy Facility may provide this information as part of a visual
assessment if required pursuant to Section 14.5:
a. Site Line Representations of each Wind Turbine from the nearest Occupied
Building and from at least one other representative location within 500 feet of the
Wind Turbine, such as a Scenic Resource or another Occupied Building. Each
Site Line Representation shall be drawn at a scale sufficiently large to make it
legible. If screening is proposed, the proposed screening device, such as trees,
shrubs or fencing, shall be depicted on the drawing along with the sight line as
altered by the screening.
b. A current eight-inch by ten-inch color photograph of the proposed site of the Wind
Turbine(s) taken from viewpoints corresponding to each of the Site Line
Representations.
c. One copy of the photographs described in b, above, onto which is
superimposed an accurately-scaled and sited representation of the Wind
Turbine(s).
14 -- An application for a Type 2 Wind Energy Facility that generates energy primarily for
sale or use bye a Person other than the generator, shall include, if issued at the time of
application, certification from the Department of Environmental Protection pursuant to
35-A M.R.S. 3456 that the Wind Energy Facility:
a. Will meet the requirements of the noise control rules adopted by the Board of
Environmental Protection pursuant to the Site Location of Development Act,
38 M.R.S. 481, et seq.
b. Will be designed and sited to avoid unreasonable adverse Shadow Flicker effects,
and,
c. Will be constructed with setbacks adequate to protect public safety.
If such certification has not been issued at the time of application, the Applicant shall
include written evidence that the Applicant has applied for certification.
Additional Submission Requirements for an Applicant for a Type 2 and 3 Wind Energy
Facility:
| ~-- Certificates of design compliance obtained by the equipment manufacturer from
Underwriters Laboratories, Det Norske Veritas, or other similar certifying organizations.
13
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
2 ~ Decommissioning plan in conformance with Appendix C.
3 -- Written summary of operation and maintenance procedures for the Wind Energy
Facility and a maintenance plan for access roads, erosion and sedimentation controls
and storm water management facilities.
4 -- Standard boundary survey of the subject property stamped by a Maine-licensed
surveyor. The Searsport Planning Board may waive this requirement if it
determines that the Applicant has provided information sufficient to identify property
boundaries to the extent necessary>
5 - Visual impact assessment, if required pursuant to Section 14.5.
6 - Stormwater management plan stamped by a Maine-licensed professional engineer.
7 -- Sound level analysis, prepared by a qualified engineer, which addresses the standards
of Section 14.1.
8 -- Shadow Flicker analysis based on WindPro or other modeling software approved by
the Department of Environmental Protection.
9 -- Foundation and anchoring system drawings that are stamped by a Maine-licensed
professional engineer.
10 -- Other relevant studies, reports, certifications and approvals as may be reasonably
requested by the Searsport Planning Board to ensure compliance with this
Ordinance.
11.0 -- Meteorological Towers (MET Towers)
Applications for Meteorological (MET) Towers shall be subject to the submission and review
standards for a Type 1A Wind Energy Facility, as applicable, except that no height limitation shall
apply. A permit for a MET Tower shall be valid for 2 years and 2 months from the date of
issuance. The Code Enforcement Officer may grant one or more one-year extensions of this
permit period. Within 30 days following removal of a MET Tower the Applicant shall restore the
site to its original condition to the extent practicable. The provisions of this section do not apply
to permanent MET Towers included as Associated Facilities in approved Wind Energy Facility
applications.
12.0 -- General Standards
12.1 -- Safety Setbacks
Wind Turbines shall be set back a horizontal distance equivalent to 150% of the Turbine
Height from property boundaries, public and private rights-of-way and overhead utility lines
that are not part of the proposed Generating Facility except that the entity responsible for
14
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
review and approval of the application may allow a reduced setback if the Applicant submits,
in writing: 1) a waiver of the property boundary setback signed by the pertinent abutting
landowner or; 2) evidence, such as operating protocols, safety programs, or recommendations
trom the manufacturer or a licensed professional engineer with appropriate expertise and
experience with Wind Turbines, that demonstrates that the reduced setback proposed
by the Applicant is appropriate.
12.2 -- Natural Resource Protection
A Wind Energy Facility shall not have an unreasonable adverse effect on rare, threatened, or
endangered wildlife, significant wildlife habitat, rare, threatened or endangered plants and
rare and exemplary plant communities. In making its determination under this subsection, the
municipal entity responsible for review and approval of the permit application under Section
9.1 shall consider pertinent application materials and the written comments and/or
recommendations, if any, of the Maine Department of Inland Fisheries and Wildlife (MDIFW)
Environmental Coordinator and the Maine Natural Areas Program (MNAP).
12.3 -- Building Permit
All components of the Wind Energy Facility shall conform to relevant and applicable local
and state building codes.
12.4 -- Overspeed Controls and Brakes
Each Wind Turbine shall be equipped with an overspeed control system that; 1) includes both
an aerodynamic control such as stall regulation, variable blade pitch, or other similar system,
and a mechanical brake that operates in fail safe mode; or 2) has been designed by the
manufacturer or a licensed civil engineer and found by the municipal entity responsible for
review and approval of the application under 9.1, based on its review of a written description
of the design and function of the system, to meet the needs of public safety.
12.5 -- Electrical Components and Interconnections
All electrical components of the Wind Energy Facility shall conform to relevant and applicable
local, state, and national codes.
12.6 ~ Access
All ground-mounted electrical and control equipment and all access doors to a Wind Turbine
shall be labeled and secured to prevent unauthorized access. A Wind Tower shall not be
climbable up to a minimum of fifteen (15) feet above ground surface.
12.7 - Blade Clearance
The minimum distance between the ground and all blades of a Wind Turbine shall be 25 feet
as measured at the lowest are of the blades.
15
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
12.8 ~ Signal Interference
The Applicant shall make reasonable efforts to avoid and mitigate to the extent practicable
any disruption or loss of radio, telephone, television, or similar signals caused by the Wind
Energy Facility.
12.9 ~ Structure Type
With the exception of Meteorological (MET) Towers, Towers shall be monopoles with no guy
wires. This requirement may be waived if the Applicant demonstrates to the satisfaction of the
municipal entity responsible for review and approval of the permit application under Section
9.1, that there is no practicable alternative. Bird flight diverters must be installed on any guy
wires that are permitted.
12.10 -- Erosion Control
Erosion of soil and sedimentation shall be minimized by employing "best management
practices" in the most recent edition of "Maine Erosion Control Handbook for Construction
Best Management Practices",
12.11 -- Building-Mounted Wind Turbines
Building-mounted Wind Turbines are not permitted.
12.12 -- Visual Appearances
| ~ A Wind Turbine shall be a non-obtrusive color such as white, off-white, or gray, or as
may otherwise be required by another governmental agency with jurisdiction over the
Wind Energy Facility.
2 --A Wind Turbine shall not be lighted artificially, except to the extent consistent with
Federal Aviation Administration recommendations or other applicable authority that
regulates air safety or as is otherwise required by another governmental agency with
jurisdiction over the Wind Energy Facility.
3 -- A Wind Turbine shall not be used to support signs and shall not display advertising
except for reasonable and incidental identification of the turbine manufacturer,
facility owner and operator, and for warnings.
12-13 -- Visibility of Wind Turbines
The following requirements apply, the extent practicable, to Type 1B and Type 2 Wind
Energy facilities:
16
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
| -- To the extent that doing so does not inhibit adequate access to the wind resource,
each Wind Turbine shall be located to maximize the effectiveness of existing
vegetation, structures and topographic features in screening views of the Wind Turbine
from Occupied Buildings and Scenic Resources.
2 -- When existing features do not screen views of a Wind Turbine from Residences and
Scenic Resources, screening may be required, where feasible and effective, through!
the planting of trees and/or shrubs. In order to maximize the screening effect and
minimize wind turbulence near the Wind Turbine, plantings should be situated as near
as possible to the point from which the Wind Turbine is being viewed. Such plantings
should be of native varieties.
13.0 -- Special Standards for Type 1A and Type 1B Wind Energy Facilities
13.1 -- Noise emanating from a Type 1A or Type 1B Wind Energy Facility shall be controlled in
accordance with the provisions of this section or, upon written request of the applicant,
the provision of Section 14.1. If the Applicant chooses review under Section 14.1, the
provisions of 13.1.1, 13.1.2 and 13.1.6 shall apply, but the provisions of 13.1.3, 13.1.4 and
13.1.5 shall not apply.
| -- The sound level limits contained in this section apply only to areas that are defined as
Protected Locations and to property boundaries that describe the outer limits of the
facility site in combination with any parcel(s) owned by a Participating Land Owner that
are contiguous with the facility site.
2 -- The sound level limits contained in this section do not apply to the facility site or any
parcel(s) owned by a Participating Land Owner that are contiguous with the facility site.
3 -- The sound levels resulting from routine operation of a Wind Energy Facility, as measured
in accordance with the procedures described in Section 13.1.5 shall not
exceed the limits specified for the following locations and times:
a. At a Protected Location with no living and sleeping quarters:
- 55 dBA during the Protected Location's regular hours of operation
b. At a Protected Location with living and sleeping quarters:
1. Area(s) within 500 feet of living and sleeping quarters:
- 45 dBA between 7:00 p.m. and 7:00 a.m.
- 55 dBA between 7:00 a.m. and 7:00 p.m.
2. Area(s) more than 500 feet from living and sleeping quarters:
- 55 dBA at all times
17
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
c. At property boundaries that describe the outer limits of the facility site combined
with any parcel(s) owned by a Participating Land Owner that are contiguous with
the facility site:
- 75 dBA at all times
4 -- Ifthe Applicant submits the certification and acknowledgment required by Section
10.1.12(1), the municipal entity responsible for review and approval of the application
under Section 9.1 shall determine, for purposes of issuing its approval, that the
pertinent sound-level limits under Section 13.1.1 have been met, subject to the
Applicant's obligation to take remedial action as necessary under Section 13.1.4.
5 ~ The Code Enforcement Officer, or a designated, qualified individual, may perform
measurements of sound levels resulting from routine operation of an installed Type LA
or Type 1B Wind Energy Facility at the officer's own initiative or in response to a
noise-related complaint to determine compliance with the pertinent standards in
Section 13.1.1. Such measurements shall be performed as follows:
a. Measurements shall be obtained during representative weather conditions when
the sound of the Wind Energy Facility is most clearly noticeable. Preferable
weather conditions for sound measurements at distances greater than about 500
feet from the sound source include overcast days when the measurement location
is downwind of the Wind Turbine and inversion periods (which most commonly
occur at night).
b. Sound levels shall be measured at least four (4) feet above the
ground by a meter set on the A-weighted response scale, fast response. The
meter shall meet the latest version of American National Standards Institute (ANSI
S 1.4) "American Standard Specifications for General Purpose Sound Level Meters"
and shall have been calibrated at a recognized laboratory within the past year.
c. 5 dBA shall be added to sound levels of any Short Duration Repetitive Sound
measured in accordance with paragraphs a and b.
6 -- The Applicant shall operate the proposed Wind Energy Facility in conformance with
the sound level limits of Section 13.1 or Section 14.1, as applicable. [f, based on post-
installation measurements taken in accordance with Section 13.1.4 or Section 14.1, as
applicable, the Code Enforcement Officer determines that the applicable sound-level
limits are not being met, the Applicant shall, at the Applicant's expense and in
accordance with the Town of Searsport Wind Energy Facility Ordinance and in
consultation with the Code Enforcement Officer, take remedial action deemed
necessary by the Code Enforcement to ensure compliance with those limits.
Remedial action that the Code Enforcement Officer may require, includes, but shall
not be limited to, one or more of the following:
a. modification or limitation of operations during certain hours or wind conditions;
18
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
b. maintenance, repair, modification or replacement of equipment;
c. relocation of the Wind Turbine(s); and,
d. removal of the Wind Turbine(s) provided that the Code Enforcement Officer may
require removal of the Wind Turbine(s) only if the Code Enforcement Officer
determines that there is no practicable alternative.
13.2 -- Discontinued Use
| ~A Type 1A or Type 1B Wind Energy Facility that is not generating electricity for twelve
(12) consecutive months shall be deemed a discontinued use and shall be removed
from the property by the Applicant within 120 days of receipt of notice from the Code
Enforcement Officer, unless the Applicant provides information that the Searsport
Planning Board deems sufficient to demonstrate that the project has not been
discontinued and should not be removed. If the Wind Energy Facility is not removed
within this time period, the municipality may remove the turbine at the Applicant's
expense. The Applicant shall pay all site reclamation costs deemed necessary and
reasonable to return the site to its pre-construction condition, including the removal
of roads and reestablishment of vegetation.
2 -- Ifa surety has been given to the municipality for removal of a Type 1B Wind Energy
Facility, the Applicant may apply to the Searsport Planning Board for release of
the surety when the Wind Energy Facility has been removed to the satisfaction of the
Code Enforcement Officer.
14.0 -- Special Standards for Type 2 and Type 3 Wind Energy Facilities
14.1 -- Control of Noise
Noise emanating from a Type 2 Wind Energy Facility, a Type 3 Wind Energy Facility, or,
upon written request of the Applicant pursuant to Section 13.1, a Type 1A or Type 1B Wind
Energy Facility shall be controlled in accordance with the provisions of Appendix B.
If there is a conflict between a provision of Appendix B and another provision of this
Ordinance, the provision of Appendix B shall apply.
14.2 -- Use of Public Roads
| -- The Applicant Shall identify all state and local public roads to be used within the Town
of Searsport to transport equipment and parts for construction, operation or
maintenance of a Type 2 or Type 3 Wind Energy Facility.
2 ~ The Town Engineer, Road Commissioner or a qualified third-party engineer reasonably
acceptable to both the Searsport Planning Board and the Applicant
shall document road conditions again thirty (30) days after
construction is complete or as weather permits.
19
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
3 -- The Applicant shall demonstrate to the satisfaction of the Searsport Planning Board,
that it has financial resources sufficient to comply with subsection 4, below, and the
Searsport Planning Board may require the Applicant to post a bond or
other security in order to ensure such compliance.
4 -- Any road damage caused by the Applicant or its contractors shall be promptly repaired
at the Applicant's expense.
14.3 -- Warnings
A clearly visible warning sign concerning voltage must be placed at the base of all pad-
mounted transformers and substations.
14.4 -- Artificial Habitat
To the extent practicable, the creation of artificial habitat for raptors or raptor prey shall be
minimized. In making its determination under this subsection the Searsport Planning
Board shall consider comments and recommendations, if any, provided by the Maine
Department of Inland Fisheries and Wildlife (MDIFW).
14.5 ~ Effect on Scenic Resource
| -- Except as otherwise provided in this subsection, if a Type 2 or Type 3 Wind Energy
Facility is proposed for location in or is visible from a Scenic Resource, the Applicant
shall provide the Searsport Planning Board a visual impact assessment that
addresses the evaluation criteria in subsection 14.5.e3. There is a rebuttable
presumption that a visual impact assessment is not required for those portions of a
Type 2 or Type 3 Wind Energy Facility that is located more than 3 miles, measured
horizontally, from a Scenic Resource. The Searsport Planning Board may require
a visual impact assessment for portions of the Type 2 or Type 3 Wind Energy Facility
located more than 3 miles and up to 8 miles from a Scenic Resource if it finds that a
visual impact assessment is needed to determine if there is the potential for significant
adverse effects on the Scenic Recourse. Information intended to rebut the
presumption must be submitted to the Searsport Planning Board by any
interested person within 30 days of acceptance of the application as complete. The
Searsport Planning Board shall determine if the presumption is rebutted based
on a preponderance of evidence in the record.
2 ~ The Searsport Planning Board shall determine, based on consideration of the evaluation
criteria in subsection 14.5.3, whether the Type 2 or 3 Wind Energy Facility
significantly compromises views from a Scenic Resource such that the proposed
facility has an unreasonable adverse effect on the scenic character or existing uses
related to the sce3nic character of the Scenic Resource.
20
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
3 ~ In making the determination pursuant to subsection 14.5.2, and in determining whether
an Applicant for a Type 2 or 3 Wind Energy Facility located more than 3 miles from a
Scenic Resource must provide a visual impact assessment in accordance with
subsection 14.5.1, the Searsport Planning Board shall consider:
a. The significance of the potentially affected Scenic Resource;
b. The existing character of the surrounding area;
c. The expectations of the typical viewer;
d. The Type 2 or Type 3 Wind Energy Facility's purpose and the context of the
proposed activity.
e. The extent, nature and duration of potentially affected public uses of the Scenic
Resource and the potential effect on the public's continued use and enjoyment of
the Scenic Resource, and
f. The scope and scale of the potential effect of views of the Wind Energy Facility on
the Scenic Resource, including but not limited to issues related to the number and
extent of the Wind Turbine(s) visible from the Scenic Resource, the distance from the
Scenic Resource and the effect of prominent features of the Wind Energy Facility
on the landscape.
A finding by the Searsport Planning Board that the type 2 or Type 3 Wind
Energy Facility is a highly visible feature of the landscape is not a solely sufficient
basis for determination that it has an unreasonable adverse effect on the scenic
character and existing uses related to the scenic character of a Scenic Resource. In
making its determination under subsection 14.5.2, the Searsport Planning Board
shall consider insignificant the effects of portions of a Type 2 or type 3 Wind Energy
Facility located more than 8 miles, measured horizontally, from a Scenic Resource.
14.6 -- Shadow Flicker
Type 2 and Type 3 Wind Energy Facilities shall be designed to avoid unreasonable adverse
shadow flicker effect at any Occupied Building located on a Non-Participating Landowner's
property.
14.7 --- Relationship to DEP Certification and Permitting
1 -- For a Type 2 Wind Energy Facility for which a DEP Certification has been submitted in
accordance with Section 10.1.14, the Searsport Planning Board shall consider, to the
extent applicable, pertinent findings in that certification when making its
determination under Sections 12,1. 14.1, and 14.6. There is a rebuttable presumption
that a Wind Energy Facility that has obtained DEP Certification meets the
requirements of Sections 12.1, 14.1, and 14.6. The Searsport Planning Board
may, as a condition of approval of a Type 2 Wind Energy Facility that generates
energy for sale or use by a person other than the generator, deem DEP's issuance of
a certificate for the development sufficient to meet, in whole or in part, as applicable,
21
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
the requirements of Sections 12.1, 14.1, and 14.6.
2- If DEP has issued a Site Location of Development Act permit for a Type 3 Wind
Energy Facility pursuant to 38 M.R.S. #84(3), there is a rebuttable presumption that
the development meets the requirements of Sections 12.1, 12.2, 14.1, 14.6, 14.12 and,
as it pertains to Scenic Resources of state or national significance as defined by 35-A
MLR.S. 3451(9), Section 14.5. The Searsport Planning Board may, as a
condition of approval of a Type 3 Wind Energy Facility, deem DEP's issuance of a
permit for the development sufficient to meet, in whole or in part, as applicable, the
requirements of Sections 12.1, 12.2, 14.1, 14.6, 14.12 and, as it pertains to Scenic
Resources of state or national significance, Section 14.5.
14.8 -- Local Emergency Services
| -- The Applicant shall provide a copy of the project summary and site plan to local
emergency service providers, and or volunteer fire departments.
2 -- Upon request, the Applicant shall cooperate with emergency service providers to
develop and coordinate implementation of an emergency response plan for a Type 2
or a Type 3 Wind Energy Facility.
3 ~ A Wind Turbine shall be equipped with an appropriate fire suppression system to
address fires within the Nacelle portion of the turbine or shall otherwise address the
issue of fire safety to the satisfaction of the Searsport Planning Board.
14.9 -- Liability Insurance
The Applicant or an Applicant's designee acceptable to the Searsport Planning Board
shall maintain a current general liability policy for the Type 2 or Type 3 Wind Energy Facility
that covers bodily injury and property damage with limits in an amount commensurate with
the scope and scale of the Facility. The Applicant or its designee shall make certificates of
insurance available to the Searsport Planning Board upon request.
14.10 ~ Design Safety Certification
Each Wind Turbine shall conform to applicable industry standards including those of the
American National Standards Institute (ANSI) and at least one of the following: Underwriters
Laboratories, Det Norske Veritas, Germanischer Lloyd Wind Energies, or other similar
certifying organization.
14.11 -- Public Inquiries and Complaints
| -- The Applicant or its designee shall maintain a phone number and identify a
responsible Person for the public to contact with inquiries and complaints throughout
the life of the Wind Energy Facility.
2 -- The Applicant or its designee shall make reasonable efforts to respond to the public's
inquiries and complaints and shall provide written copies of all complaints and the
company's resolution or response to the Code Enforcement Officer.
14.12 - Decommissioning
The Applicant shall prepare a decommissioning plan in conformance with Appendix C.
22
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
APPENDIX A
Application Fees
All fees associated with this Ordinance will conform to the fee schedule of the Searsport
Land Use Permit Fee Schedule.
23
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
APPENDIX B
Control of Noise
Pursuant to section 14.1, noise emanating from a Type 2 Wind Energy Facility, a Type 3 Wind Energy Facility,
or, upon written request of the Applicant pursuant to section 13.1, a Type 1A or Type 1B Wind Energy Facility,
shall be controlled in accordance with the following provisions:
A. Sound Level Limits
(1) Sound from Routine Operation of Facility.
(a) Except as noted in subsections (b) and (c) below, the hourly sound levels resulting from routine
operation of the facility and measured in accordance with the measurement procedures described
in subsection F shall not exceed the following limits:
(i) At any property line of the facility site or contiguous property owned by the Applicant or
Participating Land Owner(s), whichever is farther from the proposed facility's regulated sound
sources:
75 dBA at any time of day.
(ii) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use or
use contemplated under a comprehensive plan, is not predominantly commercial,
_ transportation, or industrial;
60 dBA between 7:00 a.m. and 7:00 p.m.
(the "daytime hourly limit"), and
50 dBA between 7:00 p.m. and 7:00 a.m.
(the "nighttime hourly limit").
(iii) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use or
use contemplated under a comprehensive plan, is predominantly commercial, transportation,
or industrial:
70 dBA between 7:00 a.m. and 7:00 p.m.
(the "daytime hourly limit"), and
60 dBA between 7:00 p.m. and 7:00 a.m.
(the 'nighttime hourly limit').
(iv) For the purpose of determining whether the use of an unzoned area is predominantly
commercial, transportation, or industrial (e.g. non-residential in nature), the Codes
Enforcement Officer shall consider the municipality's comprehensive plan, if any. Furthermore,
the usage of properties abutting each Protected Location shall be determined, and the limits
applied for that Protected Location shall be based upon the usage occurring along the greater
24
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
portion of the perimeter of that parcel; in the event the portions of the perimeter are equal in
usage, the limits applied for that Protected Location shall be those for a Protected Location in
an area for which the use is not predominantly commercial, transportation, or industrial.
(v) When a proposed facility is to be located in an area where the daytime pre-development
ambient hourly sound level at a Protected Location is equal to or less than 45 dBA and/or the
nighttime pre-development ambient hourly sound level at a Protected Location is equal to or
less than 35 dBA, the hourly sound levels resulting from routine operation of the facility and
measured in accordance with the measurement procedures described in subsection F shall
not exceed the following limits at that Protected Location:
55 dBA between 7:00 a.m. and 7:00 p.m.
(the "daytime hourly limit"), and
45 dBA between 7:00 p.m. and 7:00 a.m.
(the "nighttime hourly limit").
For the purpose of determining whether a Protected Location has a daytime or nighttime pre-
development ambient hourly sound level equal to or less than 45 dBA or 35 dBA, respectively,
the Applicant may make sound level measurements in accordance with the procedures in
subsection F or may estimate the sound-level based upon the population density and proximity
to local highways. If the resident population within a circle of 3,000 feet radius around a
Protected Location is greater than 300 persons, or the hourly sound level from highway traffic
at a Protected Location is predicted to be greater than 45 dBA in the daytime or 35 dBA at
night, then the Applicant may estimate the daytime or nighttime pre-development ambient
hourly sound level to be greater than 45 dBA or 35 dBA, respectively.
NOTE: Highway traffic noise can be predicted using the nomograph method of FHWA
Highway Traffic Noise Prediction Model, FHWA-RD-77-108, December, 1978.
(vi) Notwithstanding the above, the Applicant need not measure or estimate the pre-development
ambient hourly sound levels at a Protected Location if he demonstrates, by estimate or
example, that the hourly sound levels resulting from routine operation of the facility will not
exceed 50 dBA in the daytime or 40 dBA at night.
(b) If the Applicant chooses to demonstrate by measurement that the daytime and/or nighttime pre-
development ambient sound environment at any Protected Location near the facility site exceeds
the daytime and/or nighttime limits in subsection 1(a)(ii) or 1(a)(iii) by at least 5 dBA, then the
daytime and/or nighttime limits shall be 5 dBA less than the measured daytime and/or nighttime
pre-development ambient hourly sound level at the location of the measurement for the
corresponding time period.
(c) For any Protected Location near an existing facility, the hourly sound level limit for routine
operation of the existing facility and all future expansions of that facility shall be the applicable
hourly sound level limit of 1(a) or 1(b) above, or, at the Applicant's election, the existing hourly
sound level from routine operation of the existing facility plus 3 dBA.
(d) For the purposes of determining compliance with the above sound level limits, 5 dBA shall be
added to the observed levels of any tonal sounds that result from routine operation of the facility.
25
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
(e) When routine operation of a facility produces short duration repetitive sound, the following limits
shail apply:
(i) For short duration repetitive sounds, 5 dBA shall be added to the observed levels of the short
duration repetitive sounds that result from routine operation of the facility for the purposes of
determining compliance with the above sound level limits.
(ii) For short duration repetitive sounds which the municipal entity responsible for review and
approval of a pending application under section 9.1 determines, due to their character and/or
duration, are particularly annoying or pose a threat to the health and welfare of nearby
neighbors, 5 dBA shall be added to the observed levels of the short duration repetitive sounds
that result from routine operation of the facility for the purposes of determining compliance with
the above sound level limits, and the maximum sound level of the short duration repetitive
sounds shall not exceed the following limits:
(a) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use
or use contemplated under a comprehensive plan, is not predominantly commercial,
transportation, or industrial:
65 dBA between 7:00 a.m. and 7:00 p.m., and
55 dBA between 7:00 p.m. and 7:00 a.m.
(b) At any Protected Location in an area for which the zoning, or, if unzoned, the existing use
or use contemplated under a comprehensive plan, is predominantly commercial,
transportation, or industrial:
75 dBA between 7:00 a.m. and 7:00 p.m., and
65 dBA between 7:00 p.m. and 7:00 a.m.
(c) The methodology described in subsection 1(a)(iv) shall be used to determine whether the
use of an unzoned area is predominantly commercial, transportation, or industrial.
(d) If the Applicant chooses to demonstrate by measurement that the pre-development
ambient hourly sound level at any Protected Location near the facility site exceeds 60 dBA
between 7:00 a.m. and 7:00 p.m., and/or 50 dBA between 7:00 p.m. and 7:00 a.m., then
the maximum sound level limit for short duration repetitive sound shall be 5 dBA greater
than the measured pre-development ambient hourly sound level at the location of the
measurement for the corresponding time period.
(e) For any Protected Location near an existing facility, the maximum sound level limit for
short duration repetitive sound resulting from routine operation of the existing facility and
all future expansions and modifications of that facility shall be the applicable maximum
sound level limit of (e)(ii)(a) or (e)(ii)(b) above, or, at the Applicant's election, the existing
maximum sound level of the short duration repetitive sound resulting from routine
operation of the existing facility plus 3 dBA.
NOTE: The maximum sound level of the short duration repetitive sound shall be measured using the
fast response [LAFmax]. See the definition of maximum sound level.
26
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
(2) Sound from Construction of a Facility
(a) The sound from construction activities between 7:00 p.m. and 7:00 a.m. is subject to the following
limits:
(i) Sound from nighttime construction activities shall be subject to the nighttime routine operation
sound level limits contained in subsections 1(a) and 1(b).
(ii) If construction activities are conducted concurrently with routine operation of the facility, then
the combined total of construction and routine operation sound shall be subject to the
nighttime routine operation sound level limits contained in subsections 1(a) and 1(b).
(iii) Higher levels of nighttime construction sound are permitted when a duly issued permit
authorizing nighttime construction sound in excess of these limits has been granted by the
Codes Enforcement Officer.
(b) Sound from construction activities between 7:00 a.m. and 7:00 p.m. shall not exceed the following
limits at any Protected Location:
Duration of Activity | Hourly Sound
Level Limit
87 dBA
90 dBA
92 dBA
95 dBA
97 dBA
100 dBA
105 dBA
c) All equipment used in construction on the facility site shall comply with applicable federal noise
regulations and shall include environmental noise control devices in proper working condition, as
originally provided with the equipment by its manufacturer.
(3) Sound from Maintenance Activities
(a) Sound from routine, ongoing maintenance activities shall be considered part of the routine
operation of the facility and the combined total of the routine maintenance and operation sound
shall be subject to the routine operation sound level limits contained in subsection 1.
(b) Sound from occasional, major, scheduled overhaul activities shall be subject to the construction
sound level limits contained in subsection 2. If overhaul activities are conducted concurrently with
routine operation and/or construction activities, the combined total of the overhaul, routine
operation and construction sound shall be subject to the construction sound level limits contained
in subsection 2.
B. Submissions
27
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
(1) Facilities with Minor Sound Impact.
An Applicant proposing facility with minor sound impact may choose to file, as part of the permit
application, a statement attesting to the minor nature of the anticipated sound impact of their facility.
An applicant proposing an expansion or modification of an existing facility with minor sound impact
may follow the same procedure as described above. For the purpose of this ordinance, a facility or an
expansion or modification of an existing facility with minor sound impact means a facility where the
Applicant demonstrates, by estimate or example, that the regulated sound from routine operation of
the facility will not exceed 5 dBA less than the applicable limits established under Section A. It is the
intent of this subsection that an applicant need not conduct sound level measurements to
demonstrate that the facility or an expansion or modification of an existing facility will have a minor
sound impact.
(2) Other Facilities
Technical information shall be submitted describing the Applicant's plan and intent to make adequate
provision for the control of noise. The applicant's plan shall contain information such as the following,
when appropriate:
(a) Maps and descriptions of the land uses, local zoning and comprehensive plans for the area
potentially affected by sounds from the facility.
(b) A description of major sound sources, including tonal sound sources and sources of short duration
repetitive sounds, associated with the construction, operation and maintenance of the proposed
facility, including their locations within the proposed facility.
(c) A description of the daytime and nighttime hourly sound levels and, for short duration repetitive
sounds, the maximum sound levels expected to be produced by these sound sources at Protected
Locations near the proposed facility.
(d) A description of the Protected Locations near the proposed facility.
(e) A description of proposed major sound control measures, including their locations and expected
performance.
(f) A comparison of the expected sound levels from the proposed facility with the sound level limits of
this regulation.
C. Terms and Conditions
The municipal entity responsible for review and approval of the pending application under 9.1 may, as a
term or condition of approval, establish any reasonable requirement to ensure that the Applicant has
made adequate provision for the contro! of noise from the facility and to reduce the impact of noise on
Protected Locations. Such conditions may include, but are not limited to, enclosing equipment or
operations, imposing limits on hours of operation, or requiring the employment of specific design
technologies, site design, modes of operation, or traffic patterns.
The sound level limits prescribed in this ordinance shall not preclude the municipal entity responsible for
28
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
review and approval of the pending application under 9.1 from requiring an Applicant to demonstrate that
sound levels from a facility will not unreasonably disturb wildlife or adversely affect wildlife populations in
accordance with 12.2. In addition, the sound level limits shall not preclude the municipal entity
responsible for review and approval of the pending application under 9.1, as a term or condition of
approval, from requiring that lower sound ievel iimits be met to ensure that the Applicant has made
adequate provision for the protection of wildlife.
D. Waiver from Sound Level Limits
The Town of Searsport recognizes that there are certain facilities or activities associated with facilities for
which noise control measures are not reasonably available. Therefore, the municipal entity responsible
for review and approval of the pending application under section 9.1 may grant a waiver from any of the
sound level limits contained in this ordinance upon (1) a showing by the Applicant that he or she has
made a comprehensive assessment of the available technologies for the facility and that the sound level
limits cannot practicably be met with any of these available technologies, and (2) a finding by the
municipal entity responsible for review and approval of the pending application under section 9.1 that the
proposed facility will not have an unreasonable impact on Protected Locations. In addition, a waiver may
be granted by the municipal entity responsible for review and approval of the pending application under
section 9.1 if (1) a facility is deemed necessary in the interest of national defense or public safety and the
Applicant has shown that the sound level limits cannot practicably be met without unduly limiting the
facility's intended function, and (2) a finding is made by the municipal entity responsible for review and
approval of the pending application under section 9.1 that the proposed facility will not have an
unreasonable impact on Protected Locations. The municipal entity responsible for review and approval of
the pending application under section 9.1 shall consider the request for a waiver as part of the review of a
completed permit application. In granting a waiver, the municipal entity responsible for review and
approval of the pending application under section 9.1 may, as a condition of approval, impose terms and
conditions to ensure that no unreasonable sound impacts will occur.
E. Definitions
Terms used herein are defined below for the purpose of this noise regulation.
(1) AMBIENT SOUND: At a specified time, the all-encompassing sound associated with a given environment,
being usually a composite of sounds from many sources at many directions, near and far, including the
specific facility of interest.
(2) CONSTRUCTION: Activity and operations associated with the facility or expansion of the facility or its
site.
(3) EMERGENCY: An unforeseen combination of circumstances which calls for immediate action.
(4) EMERGENCY MAINTENANCE AND REPAIRS: Work done in response to an emergency.
(5) ENERGY SUM OF A SERIES OF LEVELS: Ten times the logarithm of the arithmetic sum of the
antilogarithms of one-tenth of the levels. [Note: See Section F(4.2).]
(6) EXISTING FACILITY: A Wind Energy Facility legally constructed before the effective date of this
ordinance or a proposed Wind Energy Facility for which the Application is found complete on or before
the effective date of this ordinance. Any facility with an approved permit application which has been
29
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
remanded to the municipal entity responsible for review and approval of the application under 9.1 by a
court of competent jurisdiction for further proceedings relating to noise limits or noise levels prior to the
effective date of this ordinance shall not be deemed an existing facility and the ordinance shall apply to
the existing noise sources at that facility.
(7) EXISTING HOURLY SOUND LEVEL: The hourly sound level resulting from routine operation of an
existing facility prior to the first expansion that is subject to this ordinance.
(8) EQUIVALENT SOUND LEVEL: The level of the mean-square A-weighted sound pressure during a stated
time period, or equivalently the level of the sound exposure during a stated time period divided by the
duration of the period. (NOTE: For convenience, a one hour equivalent sound level should begin
approximately on the hour.)
(9) HISTORIC AREAS: Historic sites administered by the Bureau of Parks and Lands of the Maine
Department of Conservation, with the exception of the Arnold Trail.
(10)HOURLY SOUND LEVEL: The equivalent sound level for one hour measured or computed in accordance
with this ordinance.
(11)LOCALLY-DESIGNATED PASSIVE RECREATION AREA: Any site or area designated by the Town of
Searsport for passive recreation that is open and maintained for public use and which:
(a) has fixed boundaries,
(b) is owned in fee simple by the Town of Searsport or is accessible by virtue of public easement,
(c) is identified and described in the Town of Searsport comprehensive plan, and
(d) has been identified and designated at least nine months prior to submission of the Applicant's Wind
Energy Facility permit application.
(12)MAXIMUM SOUND LEVEL: Ten times the common logarithm of the square of the ratio of the maximum
sound to the reference sound of 20 micropascals. Symbol: LAFmax.
(13)MAXIMUM SOUND: Largest A-weighted and fast exponential-time-weighted sound during a specified
time interval. Unit: pascal (Pa).
(14)RESIDENCE: A building or structure, including manufactured housing, maintained for permanent or
seasonal residential occupancy providing living, cooking and sleeping facilities and having permanent
indoor or outdoor sanitary facilities, excluding recreational vehicles, tents and watercraft.
(15)PRE-DEVELOPMENT AMBIENT: The ambient sound at a specified location in the vicinity of a facility site
prior to the construction and operation of the proposed facility or expansion.
(16) PROTECTED LOCATION: any location that is:
1) accessible by foot, on a parcel of land owned by a Non-Participating Landowner containing a
Residence or planned Residence, or an approved residential subdivision, house of worship, academic
school, college, library, duly licensed hospital or nursing home near the facility site at the time an
application for a Wind Energy Facility permit is submitted under this ordinance; or
30
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
2) within a State Park, Baxter State Park, a National Park, a nature preserve owned by a land trust,
the Maine Audubon Society or the Maine chapter of the Nature Conservancy, the Appalachian Trail,
the Moosehorn National Wildlife refuge, a federally designated wilderness area, a state wilderness
area designated by statute, a municipal park or a locally-designated passive recreation area, or any
location within consolidated public reserve lands designated by rule by the Bureau of Public Lands as
a Protected Location.
At Protected Locations more than 500 feet from living and sleeping quarters within the above noted
buildings or areas, the daytime hourly sound level limits shall apply regardless of the time of day.
Houses of worship, academic schools, libraries, State and National Parks without camping areas,
Historic Areas, nature preserves, the Moosehorn National Wildlife Refuge, federally-designated
wilderness areas without camping areas, state wilderness areas designated by statute without
camping areas, and locally-designated passive recreation areas without camping areas are
considered protected locations only during their regular hours of operation.
Transient living accommodations are generally not considered Protected Locations; however, in
certain special situations where it is determined by the municipal entity responsible for review and
approval of the application under 9.1 that the health and welfare of the guests or the economic
viability of the establishment will be unreasonably impacted, the municipal entity responsible for
review and approval of the application under 9.1 may designate certain hotels, motels, campsites and
, duly licensed campgrounds as protected locations.
This term does not include buildings and structures located on leased camp lots, owned by the
Applicant used for seasonal purposes.
For purposes of this definition, (1) a Residence is considered planned when the owner of the parcel of
land on which the Residence is to be located has received all applicable building and land use permits
and the time for beginning construction under such permits has not expired, and (2) a residential
subdivision is considered approved when the developer has received all applicable land use permits
for the subdivision and the time for beginning construction under such permits has not expired.
(17)ROUTINE OPERATION: Regular and recurrent operation of regulated sound sources associated with the
purpose of the facility and operating on the facility site.
(18)SHORT DURATION REPETITIVE SOUNDS: A sequence of repetitive sounds which occur more than
once within an hour, each clearly discernible as an event and causing an increase in the sound level of at
least 6 dBA on the fast meter response above the sound level observed immediately before and after the
event, each typically less than ten seconds in duration, and which are inherent to the process or operation
of the facility and are foreseeable.
(19)SOUND COMPONENT: The measurable sound from an audibly identifiable source or group of sources.
(20)SOUND LEVEL: Ten times the common logarithm of the square of the ratio of the frequency-weighted
and time-exponentially averaged sound pressure to the reference sound of 20 micropascals. For the
purpose of this ordinance, sound level measurements are obtained using the A-weighted frequency
response and fast dynamic response of the measuring system, unless otherwise noted.
(22)SOUND PRESSURE: Root-mean-square of the instantaneous sound pressures in a stated frequency
31
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
band and during a specified time interval. Unit: pascal (Pa).
(23)SOUND PRESSURE LEVEL: Ten times the common logarithm of the square of the ratio of the sound
pressure to the reference sound pressure of 20 micropascals.
(24)TONAL SOUND: for the purpose of this ordinance, a tonal sound exists if, at a Protected Location, the
one-third octave band sound pressure level in the band containing the tonal sound exceeds the arithmetic
average of the sound pressure levels of the two contiguous one-third octave bands by 5 dB for center
frequencies at or between 500 Hz and 10,000 Hz, by 8 dB for center frequencies at or between 160 and
400 Hz, and by 15 dB for center frequencies at or between 25 Hz and 125 Hz.
Additional acoustical terms used in work associated with this ordinance shall be used in accordance with
the following American National Standards Institute (ANSI) standards:
ANSI $12.9-1988 - American National Standard Quantities and Procedures for Description and
Measurements of Environmental Sound, Part 1;
ANSI $3.20-1973 - American National Standard Psychoacoustical Terminology;
ANSI $1.1-1960 - American National Standard Acoustical Terminology.
F. Measurement Procedures
(1) Scope. These procedures specify measurement criteria and methodology for use, with applications,
compliance testing and enforcement. They provide methods for measuring the ambient sound and the
sound from routine operation of the facility, and define the information to be reported. The same methods
shall be used for measuring the sound of construction and maintenance activities.
(2) Measurement Criteria
2.1 Measurement Personnel
Measurements shall be supervised by personnel who are well qualified by training and experience in
measurement and evaluation of environmental sound, or by personnel trained to operate under a specific
measurement plan approved by the municipal entity responsible for review and approval of the pending
application under 9.1.
2.2 Measurement Insirumentation
(a) A sound level meter or alternative sound level measurement system used shall meet all of the Type 1
or 2 performance requirements of American National Standard Specifications for Sound Level Meters,
ANS $1.4-1983.
(b) An integrating sound level meter (or measurement system) shall also meet the Type 1 or 2
performance requirements for integrating/averaging in the International Electrotechnical Commission
Standard on Integrating-Averaging Sound Level Meters, IEC Publication 804 (1985).
(c) A filter for determining the existence of tonal sounds shall meet all the requirements of-American
National Standard Specification for Octave-Band and Fractional Octave-Band Analog and Digital
32
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
Filters, ANSI S1.11-1986 for Order 3, Type 3-D performance.
(d) An acoustical calibrator shall be used of a type recommended by the manufacturer of the sound level
meter and that meets the requirements of American National Standard Specification for Acoustical
Calibrators, ANSI S1.40-1984.
(e) A microphone windscreen shall be used of a type recommended by the manufacturer of the sound
level meter.
2.3 Calibration
(a) The sound level meter shall have been calibrated by a laboratory within 12 months of the
measurement, and the microphone's response shall be traceable to the National Bureau of Standards.
(b) Field calibrations shall be recorded before and after each measurement period and at shorter intervals
if recommended by the manufacturer.
2.4 Measurement Location, Configuration and Environment
(a) Except as noted in subsection (b) below, measurement locations shall be at nearby Protected
Locations that are most likely affected by the sound from routine operation of the facility.
(b) For determining compliance with the 75 dBA property line hourly sound level limit described in
subsection A(|)(a)(i), measurement locations shall be selected at the property lines of the proposed
facility or contiguous property owned by the Applicant, as appropriate.
(c) The microphone shall be positioned at a height of approximately 4 to 5 feet above the ground, and
oriented in accordance with the manufacturer's recommendations.
(d) Measurement locations should be selected so that no vertical reflective surface exceeding the
microphone height is located within 30 feet. When this is not possible, the measurement location may
be closer than 30 feet to the reflective surface, but under no circumstances shall it be closer than 6
feet.
(e) When possible, measurement locations should be at least 50 feet from any regulated sound source
on the facility.
(f) Measurement periods shall be avoided when the local wind speed exceeds 12 mph and/or
precipitation would affect the measurement results.
2.5 Measurement Plans. Plans for measurement of pre-development ambient sound or post-facility sound
may be discussed with the Codes Enforcement Officer.
(3) Measurement of Ambient Sound
3.1 Pre-development Ambient Sound
Measurements of the pre-development ambient sound are required only when the Applicant elects to
establish the sound level limit in accordance with subsections A(1)(b) and A(1)(e)(ii)(d) for a facility in an
33
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
area with high ambient sound levels, such as near highways, airports, or pre-existing facilities; or when
the Applicant elects to establish that the daytime and nighttime ambient hourly sound levels at
representative Protected Locations exceed 45 dBA and 35 dBA, respectively.
(a) Measurements shail be made at representative Protected Locations for periods of time sufficient to
adequately characterize the ambient sound. At a minimum, measurements shall be made on three
different weekdays (Monday through Friday) during ail hours that the facility will operate. If the
proposed facility will operate on Saturdays and/or Sundays, measurements shall also be made during
ail hours that the facility will operate.
(b) Measurement periods with particularly high ambient sounds, such as during holiday traffic activity,
significant insect activity or high coastline waves, should generally be avoided.
(c) At any measurement location the daytime and nighttime ambient hourly sound level shall be
computed by arithmetically averaging the daytime and nighttime values of the measured one hour
equivalent sound levels. Multiple values, if they exist, for any specific hour on any specific day shall
first be averaged before the computation described above.
3.2 Post-Facility Ambient Sound
(a) Measurements of the post-facility ambient one hour equivalent sound levels and, if short duration
repetitive sounds are produced by the facility, the maximum sound levels made at nearby Protected
Locations and during representative routine operation of the facility that are not greater than the
applicable limits of subsection C clearly indicate compliance with those limits.
(b) Compliance with the limits of subsection A(I)(b) may also be demonstrated by showing that the post-
facility ambient hourly sound level, measured in accordance with the procedures of subsection 3.1
above during routine operation of the facility, does not exceed the pre-development ambient hourly
sound level by more than one decibel, and that the sound from routine operation of the facility is not
characterized by either tonal sounds or short duration repetitive sounds.
(c) Compliance with the limits of subsection A(1)(e)(ii)(d) may also be demonstrated by showing that the
post facility maximum sound level of any short duration repetitive sound, measured in accordance
with the procedures of subsection 3.1 above, during routine operation of the facility, does not exceed
the pre-development ambient hourly sound level by more than five decibels.
(d) .If any of the conditions in (a), (b) or (c) above are not met, compliance with respect to the applicable
limits must be determined by measuring the sound from routine operation of the facility in accordance
with the procedures described in subsection 4.
(4) Measurement of the Sound from Routine Operation of Facility.
4.1 General
(a) Measurements of the sound from routine operation of facilities are generally necessary only for
specific compliance testing purposes in the event that community complaints result from operation of
the facility, for validation of an Applicant's calculated sound levels when requested by the municipal
entity responsible for review and approval of the pending application under 9.1, for determination of
existing hourly sound levels for an existing facility or for enforcement by the Codes Enforcement
Officer.
34
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
(b) Measurements shall be obtained during representative weather conditions when the facility sound is
most clearly noticeable. Preferable weather conditions for sound measurements at distances greater
than about 500 feet from the sound source include overcast days when the measurement location is
downwind of the facility and inversion periods (which most commonly occur at night).
(c) Measurements of the facility sound shall be made so as to exclude the contribution of sound from
facility equipment that is exempt from this regulation.
4.2 Measurement of the Sound Levels Resulting from Routine Operation of the Facility.
(a) When the ambient sound levels are greater than the sound level limits, additional measurements can
be used to determine the hourly sound level that results from routine operation of the facility. These
additional measurements may include diagnostic measurements such as measurements made close
to the facility and extrapolated to the Protected Location, special checkmark measurement techniques
that include the separate identification of audible sound sources, or the use of sound level meters with
pause capabilities that allow the operator to exclude non-facility sounds.
(b) For the purposes of computing the hourly sound level resulting from routine operation of the facility,
sample diagnostic measurements may be made to obtain the one hour equivalent sound levels for
each sound component.
(c) Identification of tonal sounds produced by the routine operation of a facility for the purpose of adding
the 5 dBA penalty in accordance with subsection A(|)(d) requires aural perception by the measurer,
followed by use of one-third octave band spectrum analysis instrumentation. If one or more of the
sounds of routine operation of the facility are found to be tonal sounds, the hourly sound level
component for tonal sounds shall be computed by adding 5 dBA to the one hour equivalent sound
level for those sounds.
(d) Identification of short duration repetitive sounds produced by routine operation of a facility requires
careful observations. For the sound to be classified as short duration repetitive sound, the source(s)
must be inherent to the process or operation of the facility and not the result of an unforeseeable
occurrence. If one or more of the sounds of routine operation of the facility are found to be short
duration repetitive sounds, the hourly sound level component for short duration repetitive sounds shall
be computed by adding 5 dBA to the one hour equivalent sound level for those sounds. If required,
the maximum sound levels of short duration repetitive sounds shall be measured using the fast
response [LAFmax]. The duration and the frequency of occurrence of the events shall also be
measured. In some cases, the sound exposure levels of the events may be measured. The one hour
equivalent sound level of a short duration repetitive sound may be determined from measurements of
the maximum sound level during the events, the duration and frequency of occurrence of the events,
and their sound exposure levels.
(e) The daytime or nighttime hourly sound level resulting from routine operation of a facility is the energy
sum of the hourly sound level components from the facility, including appropriate penalties, (see (c)
and (d) above). If the energy sum does not exceed the appropriate daytime or nighttime sound level
limit, then the facility is in compliance with that sound level limit at that Protected Location.
(5) Reporting Sound Measurement Data. The sound measurement data report should include the following:
(a) The dates, days of the week and hours of the day when measurements were made.
35
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
(b) The wind direction and speed, temperature, humidity and sky condition.
(c) Identification of all measurement equipment by make, model and serial number.
(d) The most recent dates of laboratory calibration of sound ievel measuring equipment.
(e) The dates, times and results of all field calibrations during the measurements.
(f) The applicable sound level limits, together with the appropriate hourly sound levels and the
measurement data from which they were computed, including data relevant to either tonal or short
duration repetitive sounds.
(g) A sketch of the site, not necessarily to scale, orienting the facility, the measurement locations,
topographic features and relevant distances, and containing sufficient information for another
investigator to repeat the measurements under similar conditions.
(h) A description of the sound from the facility and the existing environment by character and location.
36
WIND ENERGY FACILITY ORDINANCE FOR SEARSPORT, MAINE
APPENDIX C
Decommissioning Plan
Pursuant to section 14.12, the Applicant shall provide a plan for decommissioning a Type 2 or Type 3 Wind
Energy Facility. The decommissioning plan shail include, but shall not be limited to the following:
1. A description of the trigger for implementing the decommissioning plan. There is a rebuttable
presumption that decommissioning is required if no electricity is generated for a continuous period of
twelve (12) months. The Applicant may rebut the presumption by providing evidence, such as a force
majeure event that interrupts the generation of electricity, that although the project has not generated
electricity for a continuous period of 12 months, the project has not been abandoned and should not be
decommissioned.
2. A description of the work required to physically remove all Wind Turbines, associated foundations to a
depth of 24 inches, buildings, cabling, electrical components, and any other Associated Facilities to the
extent they are not otherwise in or proposed to be placed into productive use. All earth disturbed during
decommissioning must be graded and re-seeded, unless the landowner of the affected land requests
otherwise in writing.
[Note: At the time of decommissioning, the Applicant may provide evidence of plans for continued
beneficial use of any or all of the components of the Wind Energy Facility. Any changes to the approved
decommissioning plan shall be subject to review and approval by the Codes Enforcement Officer.]
3. An estimate of the total cost of decommissioning less salvage value of the equipment and itemization of
the estimated major expenses, including the projected costs of measures taken to minimize or prevent
adverse effects on the environment during implementation of the decommissioning plan. The itemization
of major costs may include, but is not limited to, the cost of the following activities: turbine removal,
turbine foundation removal and permanent stabilization, building removal and permanent stabilization,
transmission corridor removal and permanent stabilization and road infrastructure removal and
permanent stabilization.
4. Demonstration in the form of a performance bond, surety bond, letter of credit, parental guarantee or
other form of financial assurance as may be acceptable to the [Municipal Reviewing Authority] that upon
the end of the useful life of the Wind Energy Facility the Applicant will have the necessary financial
assurance in place for 100% of the total cost of decommissioning, less salvage value. The Applicant may
propose securing the necessary financial assurance in phases, as long as the total required financial
assurance is in place a minimum of 5 years prior to the expected end of the useful life of the Wind Energy
Facility.
37