This is the exact embedded text of the captured official document.
Snapshot 1cd39fa3076c · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
86
Town of Sidney
Subdivision Regulations
AUTHORITY:
These standards have been prepared in accordance with the
provisions of Title 30-A, M.R.S.A. Section 4403. These
standards shall be known and cited as the "Subdivision Standards
of the Planning Board of the Town of Sidney, Maine". They shall
apply to all subdivisions as defined by State law, including
residential, commercial and industrial.
PURPOSE:
The purpose of these regulations is to establish a review
process which will provide the Sidney Planning Board with
sufficient evidence, data, and materials to carry out its
responsibilities in reviewing subdivisions, and provide a clear
procedure which applicants for subdivision permits shall follow.
DEFINITION OF SUBDIVISION:
A subdivision is the division of a tract or parcel of land into
three or more lots within any five-year period, which period
begins after September 22, 1971, whether accomplished by sale,
lease, development, buildings, or otherwise, provided that a
division accomplished by devise, condemnation, order of court,
gift to a person related to the donor by blood, marriage, or
adoption, unless the intent of such gift is to avoid the
objectives of this section, or by transfer of any interest in
land to the owner of land abutting thereon, shall not be
considered to create a lot or lots for the purposes of this
section.
In determining whether a tract or parcel of land is divided into
three or more lots, the first dividing of such tract or parcel,
unless otherwise exempted herein, shall be considered to create
the first two lots and the next dividing of either of said first
two lots, by whomever accomplished, unless otherwise exempted
herein, shall be considered to create a third lot, unless both
such dividings are accomplished by a subdivider who shall have
retained one of such lots for his own use as a single family
residence for a period of at least five years prior to such
second dividing. Lots of 40 or more acres shall not be counted
as lots.
87
For purposes of this section, a tract or parcel of land is
defined as all contiguous land in the same ownership, provided
that lands located on opposite sides of a public or private road
shall be considered each a separate tract or parcel of land
unless such road was established by the owner of land on both
sides thereof.
SECTION I PROCEDURES:
1. Applications for subdivision permits shall be submitted
to the Planning Board at a regular Board meeting. The
Planning Board meets the first and third Monday of every
month except for legal holidays, in which case the Board
meeting is the following evening. Notice of meetings is
published in the newspaper. At this first introduction,
the developer and Board shall generally discuss the
proposed subdivision application as to its adequacy and
completeness and the overall intent of the developer.
The Board will give a dated written receipt (Form 1).
2. Within 30 days of the receipt the Board will make an on-
site inspection with the developer, if necessary, to
inspect the land in regards to the proposal. At this
time, if the Planning Board feels that a public hearing
is warranted due to the size or type of subdivision,
community impact, or by written request of the public,
it will call one. The Planning Board shall give notice of
the hearing, its date, time, and place to the developer,
and publish in both the Morning Sentinel and Kennebec
Journal, at least two times, the date of the first
publication to be at least seven days prior to the
hearing. If the Board feels that a hearing is not
necessary and all information is complete, at the next
regularly scheduled Planning Board meeting, they shall
approve, approve with condition, or deny the request in
writing. Appeals may be made to the Board of Appeals
within their jurisdiction or to Superior Court, within
30 days.
SECTION II PLAN REQUIREMENTS (Minimum of 3 copies)
1. Name of subdivision and Town of Sidney.
2. Location (Known roads, streets, waterbodies, or other
landmarks).
88
3. Map scale 1" = 100' and North point.
4. Date of plan.
5. Name of engineer and/or surveyor, address and signed
seal.
6. Names of all abutting property owners.
7. Layout of lots, total parcel acreage, lot size in
square feet, location of property and all lot lines,
including metes and bounds, to be field marked for
Planning Board inspection, approved lots to be marked
by a permanent marker.
8. Existing easements, rights-of-way, buildings, ponds,
and other pertinent existing physical features, defined
herein but not limited to:
a. Water courses, marshes, and swamps as identified by
Fish and Game Department as having high or moderate
value as water fowl nesting areas, and flood
plains.
b. Ledge outcroppings.
c. Existing wells, sewage disposal areas and systems.
d. Existing contours at 10' intervals and spot
elevations.
e. Existing wildlife habitats, (i.e., deer yards where
applicable).
9. Proposed grading and filling and reasons except for
roads.
10. Proposed roads and streets marked in 50'increments,
profile and cross-sections, including preferred street
naming, designed in a manner that will not cause
unreasonable congestion or safety hazards and are in
conformance to the Town of Sidney's Road
Specifications.
11. Proposed new water bodies (i.e., fire ponds).
12. Proposed sewage disposal systems per lot.
89
a. As shown by a licensed soil evaluator using form
HHE 200 and duly signed.
b. Soils test to be performed on each lot by a licensed
evaluator. Tests will be conducted by pit analysis;
borings will not be accepted.
c. Any easements or rights-of-way necessary to conform
with the State Plumbing Code.
13. Proposed location of wells.
14. All proposed covenants, deed restrictions, etc., to be
reviewed by the Board and a written statement as to who
will enforce said covenants or restrictions.
SECTION III OTHER ADDITIONAL REQUIREMENTS
1. Cover letter of Intent and the date requested for
formal consideration, including owner of record and his
direct designee if applicable.
2. Copy of certified and registered property deed.
3. Location of subdivision using a U.S.G.S. topo sheet.
4. Notarized letter from applicable sources stating that
the developer has adequate financial and technical
ability to meet all requirements.
5. A storm water disposal and surface drainage plan signed
by a professional engineer.
6. A signed statement from an engineer that the proposed
development will not result in undue water or air
pollution or violate the State Plumbing Code.
7. A signed statement from an engineer that in his opinion
the development complies with all applicable statutes
whether State, federal, or local.
8. Estimated cost of itemized proposed improvements.
9. Adequate information on water supply.
a. The submission of written drilling reports for wells
90
in the general vicinity of the proposed development
(one mile).
b. If records vary greatly, a ground water hydrologist
may be required to give expert testimony regarding
the available information by the developer.
A written disclosure of the above testimony on which the
Planning Board makes its decision will be presented to the
potential purchaser of any lot in the subdivision.
10. Sedimentation and erosion control plan if requested by
the Board.
11. Electrical power application from CMP for hookup and
installation.
12. Performance bonding for roads will be required for all
subdivisions.
13. Depending on the size and location of the subdivision,
the Board may require the developer to provide up to
10% of his total area for open space.
14. The developer shall install a street sign at the
intersection of all proposed streets in accordance with
the Enhanced 911 Ordinance enacted March 1996.
15. The developer shall install all appropriate regulatory
Traffic control signs as required by the Planning Board
and inspected by the Road Commissioner.
SECTION IV PLAN REVISIONS AFTER APPROVAL
No changes, erasures, modifications, or revisions shall be
made in any Final Plan after approval has been given by the
Planning Board and endorsed in writing on the Plan, unless
the Plan is first resubmitted and the Planning Board
approves any modifications. In the event that a Final Plan
is recorded without complying with this requirement, the
same shall be considered null and void, and the Board shall
institute proceeding to have the Plan stricken from the
records of the Municipal Officers and the Registry of
Deeds.
91
SECTION V ENFORCEMENT
Any person, firm, or corporation, or other legal entity who
conveys, offers, or agrees to convey any land in a
subdivision which has not been approved as required by this
section shall be punished by a fine of not more than $1000
for each such conveyance, offering, or agreement. The
Attorney General, the municipality, or the appropriate
municipal officers may institute proceedings to enjoin the
violation of this section.
SECTION VI OTHER FACTS
1. The approval of the Sidney Planning Board of a
subdivision does not mean or constitute any acceptance
by the Town of Sidney of any street, easement, or
otherwise.
2. The Planning Board may, at its discretion, upon a
written specific request by the applicant, waive or
modify the requirements of these regulations if such
waiver will not unreasonably restrict the Planning
Board's review of the application as it relates to Title
30 M.R.S.A. 4956, and such waiver is based on the undue
hardship or burden such specific regulations would have
on the applicant because of the characteristics and
circumstances relating to the subdivision.
3. Every application for a subdivision permit shall be
accompanied by an application fee of $25 per lot plus $5
per unit or lot to be paid by check, made payable to the
Town of Sidney Planning Board Account.
4. The invalidity of any section, sub-section, paragraph,
sentence, clause, or word of these regulations shall not
be held to invalidate any other part, etc., of these
regulations.
5. In any case where any provision of these regulations is
found to be in conflict with a provision of any other
ordinance, etc., the provision which established its
higher standard for the promotion and protection of
health and safety shall prevail.
6. These regulation shall take effect immediately upon
adoption, September 6, 1977, as provided in Title 30
92
M.R.S.A., Section 4956. Revised March 24, 2018
Revised March 30, 2019