Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Shoreland Zoning Ordinance
for the Town of Sorrento
2
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Table of Contents
1. Purposes. ................................................................................................................................................... 4
2. Authority. .................................................................................................................................................. 4
3. Applicability. ............................................................................................................................................ 4
4. Effective Date of Ordinance and Ordinance Amendments ....................................................................... 4
5. Availability. ............................................................................................................................................. 4
6. Severability ............................................................................................................................................... 4
7. Conflicts with Other Ordinances. ............................................................................................................. 4
8. Amendments. ............................................................................................................................................ 5
9. Districts and Zoning Map ......................................................................................................................... 5
A.
Official Shoreland Zoning Map. ...................................................................................................... 5
B.
Scale of Map .................................................................................................................................... 5
C.
Certification of Official Shoreland Zoning Map. ............................................................................. 5
D.
Changes to the Official Shoreland Zoning Map. ............................................................................. 5
10. Interpretation of District Boundaries. ..................................................................................................... 5
11. Land Use Requirements. ......................................................................................................................... 6
12. Nonconformance ..................................................................................................................................... 6
A. Purpose ................................................................................................................................................. 6
B. General ................................................................................................................................................. 6
C. Nonconforming Structures ................................................................................................................ 6
(1) Expansions. ................................................................................................................................... 6
(2) Foundations. .................................................................................................................................. 7
(3) Relocation...................................................................................................................................... 7
(4) Reconstruction or Replacement. .................................................................................................... 8
(5) Change of Use of a Nonconforming Structure. ............................................................................. 9
D. Nonconforming Uses ........................................................................................................................ 9
E.
Nonconforming Lots ....................................................................................................................... 10
13. Establishment of Districts .................................................................................................................... 10
A.
Resource Protection District. ........................................................................................................ 11
B.
Limited Residential District. ......................................................................................................... 11
C.
Limited Commercial District. ...................................................................................................... 11
D.
General Development I District. .................................................................................................. 11
E.
General Development II District. ................................................................................................... 12
F.
Commercial Fisheries/Maritime Activities District. .................................................................... 12
14. Table of Land Uses. .............................................................................................................................. 13
15. Land Use Standards. ........................................................................................................................... 15
3
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
A.
Minimum Lot Standards .................................................................................................................. 15
B.
Principal and Accessory Structures ................................................................................................. 16
C.
Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending or Located Below the
Shoreline;
and Shoreline Stabilization. ............................................................................................................. 19
D.
Campgrounds. ................................................................................................................................. 20
E.
Individual Private Campsites. ......................................................................................................... 20
F.
Commercial and Industrial Uses--For Future Use. ........................................................................ 21
G.
Parking Areas .................................................................................................................................. 21
H.
Roads and Driveways ...................................................................................................................... 21
I.
Signs. ............................................................................................................................................... 23
J.
Storm Water Runoff ........................................................................................................................ 24
K.
Septic Waste Disposal ..................................................................................................................... 24
L.
Essential Services ............................................................................................................................ 25
M. Mineral Exploration and Extraction ................................................................................................ 25
N.
Agriculture ...................................................................................................................................... 26
O.
Timber Harvesting - Repealed ........................................................................................................ 26
P.
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting ........................ 34
Q.
Hazard Trees, Dead Trees and Storm-Damaged Trees ................................................................... 36
R.
Exemptions to Section 15(P) ........................................................................................................... 37
S.
Revegetation Requirements ............................................................................................................. 38
T.
Erosion and Sedimentation Control ................................................................................................ 40
U.
Soils. ................................................................................................................................................ 41
V.
Water Quality. ................................................................................................................................. 41
W. Archaeological Site ......................................................................................................................... 41
16.
Administration ................................................................................................................................. 42
A.
Administering Bodies and Agents ................................................................................................... 42
B.
Permits Required. ............................................................................................................................ 42
C.
Permit Application and Fees ........................................................................................................... 42
D.
Procedure for Administering Permits. ............................................................................................. 43
E.
Special Exceptions. ......................................................................................................................... 44
F.
Expiration of Permit. ....................................................................................................................... 45
G.
Installation of Public Utility Service ............................................................................................... 45
H.
Appeals ............................................................................................................................................ 45
I.
Enforcement............................................................................................... ....... 48
17. Definitions ....................................................................................................................................... 49
Appendix A: Description of shoreland boundaries .................................................................................... 60
4
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Shoreland Zoning Ordinance for the Town of Sorrento
1. Purposes.
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect commercial fishing and maritime industries; to
protect freshwater and coastal wetlands; to control building sites, placement of structures and land
uses; to conserve shore cover, and visual as well as actual points of access to inland and coastal
waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
2. Authority.
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435-449 of
the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability.
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the upland edge of a
coastal wetland, including all areas affected by tidal action; and within 250 feet, horizontal distance,
of the upland edge of a freshwater wetland. This Ordinance also applies to any structure built on, over
or abutting a dock, wharf or pier, or other structure extending or located below the shoreline.
NOTE: Terms are defined in Section 17, including but not limited to: coastal wetland and
freshwater wetland.
4. Effective Date of Ordinance and Ordinance Amendments
This Ordinance, which was adopted by the municipal legislative body on June 8, 2021, shall not be
effective unless approved by the Commissioner of the Department of Environmental Protection. A
certified copy of the Ordinance, or Ordinance Amendment, attested and signed by the Municipal
Clerk, shall be forwarded to the Commissioner for approval. If the Commissioner fails to act on this
Ordinance or Ordinance Amendment, within forty-five (45) days of his/her receipt of the Ordinance,
or Ordinance Amendment, it shall be automatically approved. Any application for a permit submitted
to the municipality within the forty-five (45) day period shall be governed by the terms of this
Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance Amendment, is approved by
the Commissioner.
5. Availability.
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
6. Severability.
Should any section or provision of this Ordinance be declared by the courts to be invalid, such decision
shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances.
5
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of this
Ordinance or of any other ordinance, regulation or statute administered by the municipality, the more
restrictive provision shall control
8. Amendments.
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments,
attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body and
shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on any
amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map.
The areas to which this Ordinance is applicable are hereby divided into the following districts as
shown on the Official Shoreland Zoning Map(s) which is (are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) General Development I
(5) General Development II
(6) Commercial Fisheries/Maritime Activities
B. Scale of Map.
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000 feet.
District boundaries shall be clearly delineated and a legend indicating the symbols for each
district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map.
The Official Shoreland Zoning Map shall be certified by the attested signature of the
Municipal Clerk and shall be located in the municipal office. In the event the municipality
does not have a municipal office, the Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map.
If amendments, in accordance with Section 8, are made in the district boundaries or other
matter portrayed on the Official Shoreland Zoning Map, such changes shall be made on the
Official Shoreland Zoning Map within thirty (30) days after the amendment has been approved
by the Commissioner of the Department of Environmental Protection.
10. Interpretation of District Boundaries.
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are property
lines, the centerlines of streets, roads and rights of way, and the boundaries of the shoreland area as
defined herein. Where uncertainty exists as to the exact location of district boundary lines, the Board
of Appeals shall be the final authority as to location.
6
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
11. Land Use Requirements.
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
12. Nonconformance
NOTE: Refer to Section 17 for definitions of nonconforming condition, nonconforming
lot, nonconforming structure and nonconforming use.
A. Purpose.
It is the intent of this Ordinance to promote land use conformities, except that nonconforming
conditions that existed before the effective date of this Ordinance or amendments thereto shall
be allowed to continue, subject to the requirements set forth in Section 12. Except as otherwise
provided in this Ordinance, a nonconforming condition shall not be permitted to become more
nonconforming.
B. General
(1) Transfer of Ownership. Nonconforming structures, lots, and uses may be transferred, and
the new owner may continue the nonconforming use or continue to use the nonconforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of nonconforming uses and structures including repairs or renovations that do
not involve expansion of the nonconforming use or structure, and such other changes in a
nonconforming use or structure as federal, state, or local building and safety codes may
require.
C. Nonconforming Structures
(1) Expansions.
All new structures must meet the shoreline setback requirements contained in Section 15(B).
A nonconforming structure may be added to or expanded after obtaining a permit from the
same permitting authority as that for a new structure as identified in Table 1 of Land Uses, if
such addition or expansion does not increase the nonconformity of the structure and is in
accordance with the subsections of Section 12(C)(1).
(a) Expansion of an accessory structure that is located closer to the normal high-water line of a
tributary stream or upland edge of a wetland than the principal structure is prohibited, even
if the expansion will not increase nonconformity with the tributary stream or wetland
setback requirement.
(b) Expansion of any portion of a structure within 25 feet of the normal high-water line of a
tributary stream or upland edge of a wetland is prohibited, even if the expansion will not
increase nonconformity with the tributary stream or wetland setback requirement.
7
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(c) All other nonconforming principal and accessory structures that do not meet the tributary
stream or wetland setback requirements may be expanded or altered as follows, as long as
other applicable standards of this Ordinance are met and the expansion is not prohibited
by Section 12(C)(1) and subsections (a) or (b) above:
(i) For structures located less than 75 feet from the normal high-water line of a tributary
stream or upland edge of a wetland, the maximum combined total footprint of all
structures may not be expanded to an area greater than 1,000 square feet or 30% larger
than the footprint that existed on January 1, 1989, whichever is greater.
(ii) For structures located less than 75 feet from the normal high-water line of a tributary
stream or upland edge of a wetland, the maximum height of any structure may not be
made greater than 20 feet or the height of the existing structure, whichever is greater.
(d) In addition to the limitations in Section 12(C)(1) and subsections (a) and (b) above,
structures that are legally nonconforming due to their location within the Resource
Protection District and are located at less than 250 feet from the upland edge of a wetland
may be expanded or altered as follows, as long as other applicable standards of this
Ordinance are met:
(i) The maximum combined total footprint of all structures may not be expanded to an
area greater than 1,500 square feet or 30% larger than the footprint that existed at the
time the Resource Protection District was established on the lot, whichever is greater.
(ii) The maximum height of any structure may not be made greater than 25 feet or
the height of the existing structure, whichever is greater.
(iii) Any portion of the structures located less than 75 feet from the normal high-water
line of a tributary stream or upland edge of a wetland must meet the footprint and
height requirements of Sections 12(C)(1)(c)(i) and (ii).
(e) Any approved plan for expansion of a nonconforming structure under Section 12(C)(1)
must be recorded by the applicant in the registry of deeds of the county in which the
property is located within 90 days of approval. The recorded plan must include the
existing and proposed footprint of non conforming structure, on the property, the existing
and proposed height of structure on the property, the footprint of any other structures on
the parcel, the shoreland zone boundary and evidence of approval by the municipal
permitting authority.
(2) Foundations.
Whenever a new, expanded or replacement foundation is constructed under a nonconforming
structure, the structure and new foundation must be placed such that the shoreline setback
requirement is met to the greatest practical extent as determined by the Planning Board or its
designee, basing its decision on the criteria specified in Section 12(C)(3) Relocation below.
8
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(3) Relocation.
A nonconforming structure may be relocated within the boundaries of the parcel on which the
structure is located provided that the site of relocation conforms to all setback requirements to
the greatest practical extent as determined by the Planning Board or its designee, and provided
that the applicant demonstrates that the present subsurface sewage disposal system meets the
requirements of State law and the State of Maine Subsurface Wastewater Disposal Rules
(Rules), or that a new system can be installed in compliance with the law and said Rules.
In no case shall a structure be relocated in a manner that causes the structure to be more
nonconforming.
In determining whether the building relocation meets the setback to the greatest practical extent,
the Planning Board or its designee shall consider the size of the lot, the slope of the land, the
potential for soil erosion, the location of other structures on the property and on adjacent
properties, the location of the septic system and other on-site soils suitable for septic systems, and
the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation. In addition, the area from which the relocated
structure was removed must be replanted with vegetation. Replanting shall be required as
follows:
Trees removed in order to relocate a structure must be replanted with at least one native tree,
three (3) feet in height, for every tree removed. If more than five trees are planted, no one
species of tree shall make up more than 50% of the number of trees planted. Replaced trees
must be planted no further from the water or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed
in order to relocate a structure must be re-established. An area at least the same size as the
area where vegetation and/or ground cover was disturbed, damaged, or removed must be
reestablished within the setback area. The vegetation and/or ground cover must consist of
similar native vegetation and/or ground cover that was disturbed, destroyed or removed.
Where feasible, when a structure is relocated on a parcel the original location of the structure
shall be replanted with vegetation which may consist of grasses, shrubs, trees, or a
combination thereof.
The Planning Board shall also require replanting in accordance with Section 15(S).
(4) Reconstruction or Replacement.
Any nonconforming structure which is located less than the required setback from a tributary
stream or wetland and which is removed, or damaged or destroyed, regardless of the cause, by
more than 50% of the market value of the structure before such damage, destruction or
removal, may be reconstructed or replaced provided that a permit is obtained within eighteen
(18) months of the date of said damage, destruction, or removal, and provided that such
reconstruction or replacement is in compliance with the tributary stream or wetland setback
requirement to the greatest practical extent as determined by the Planning Board or its
designee in accordance Section 12(C)(3) above. In no case shall a structure be reconstructed
or replaced so as to increase its nonconformity.
If the reconstructed or replacement structure is less than the required setback it shall not be any
larger than the original structure, except as allowed pursuant to Section 12(C)(1) above, as
9
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
determined by the nonconforming footprint of the reconstructed or replaced structure at its
new location. If the total amount of footprint of the original structure can be relocated or
reconstructed beyond the required setback area, no portion of the relocated or reconstructed
structure shall be replaced or constructed at less than the setback requirement for a new
structure.
When it is necessary to remove vegetation in order to replace or reconstruct a structure,
vegetation shall be replanted in accordance with Section 12(C)(3) above.
Any nonconforming structure which is located less than the required setback from a tributary
stream or wetland and which is removed by 50% or less of the market value, or damaged or
destroyed by 50% or less of the market value of the structure, excluding normal maintenance
and repair, may be reconstructed in place if a permit is obtained from the Code Enforcement
Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to
the greatest practical extent the Planning Board or its designee shall consider, in addition
to the criteria in Section 12(C)(3) above, the physical condition and type of foundation
present, if any.
(5) Change of Use of a Nonconforming Structure.
The use of a nonconforming structure may not be changed to another use unless the Planning
Board, after receiving a written application, determines that the new use will have no greater
adverse impact on the tributary stream or wetland, or on the subject or adjacent properties
and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and commercial fishing and maritime
activities, and other functionally water-dependent uses.
D. Nonconforming Uses
1. Expansions.
a. Expansions of nonconforming uses are prohibited, except that nonconforming residential
uses may, after obtaining a permit from the Planning Board, be expanded within existing
residential structures or within expansions of such structures as allowed in Section 12(C)(1)
above.
2. Resumption Prohibited.
A lot, building or structure in or on which a nonconforming use is discontinued for a
period exceeding one year, or which is superseded by a conforming use, may not again be
devoted to a nonconforming use except that the Planning Board may, for good cause
shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that
the structure has been used or maintained for residential purposes during the preceding
five (5) year period.
10
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
3. Change of Use.
An existing nonconforming use may be changed to another nonconforming use provided that
the proposed use has no greater adverse impact on the subject and adjacent properties and
resources, including water dependent uses in the CFMA district, than the former use, as
determined by the Planning Board. The determination of no greater adverse impact shall be
made according to criteria listed in Section 12(C)(5) above.
E. Nonconforming Lots
(1) Nonconforming Lots: A nonconforming lot of record as of the effective date of this Ordinance
or amendment thereto may be built upon, without the need for a variance, provided that such lot
is in separate ownership and not contiguous with any other lot in the same ownership, and that
all provisions of this Ordinance except lot area, lot width and shore frontage can be met.
Variances relating to setback or other requirements not involving lot area, lot width or shore
frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure exists
on each lot, the nonconforming lots may be conveyed separately or together, provided that the
State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and the State of
Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are
in single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is
nonconforming, owned by the same person or persons on May 24, 1993, and recorded in
the registry of deeds if the lot is served by a public sewer or can accommodate a
subsurface sewage disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of
lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts
11
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
A. Resource Protection District.
The Resource Protection District includes areas in which development would adversely affect
water quality, productive habitat, biological ecosystems, or scenic and natural values. This
district shall include the following areas when they occur within the limits of the shoreland zone,
except that areas which are currently developed and areas which meet the criteria for the Limited
Commercial, General Development I, or Commercial Fisheries/Maritime Activities Districts
need not be included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands that are
rated "moderate" or "high" value waterfowl and wading bird habitat, including nesting and
feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W) that are
depicted on a Geographic Information System (GIS) data layer maintained by either MDIF&W
or the Department as of December 31, 2008. Also included in this district are areas within 250
feet, horizontal distance, of the upland edge of salt marshes and salt meadows which are rated
"moderate" or "high" value waterfowl and wading bird habitat, including nesting and feeding
areas, by the MDIF&W as of January 1, 1973.
(2) Floodplains adjacent to tidal waters, defined by the 100 year floodplain as designated on
the Federal Emergency Management Agency's Flood Insurance Rate Maps or Flood
Hazard Boundary Maps, or the flood of record, or in the absence of these, by soil types
identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric
soils, which are not part of a freshwater or coastal wetland as defined.
NOTE: These areas usually consist of forested wetlands abutting non-forested wetlands.
(5) Land areas adjacent to tidal waters which are subject to severe erosion or mass
movement, such as steep coastal bluffs.
B. Limited Residential District.
The Limited Residential District includes those areas suitable for residential and recreational
development. It includes areas other than those in the Resource Protection District, and areas
which are used less intensively than those in the Limited Commercial District, the General
Development Districts, or the Commercial Fisheries/Maritime Activities District.
C. Limited Commercial District.
The Limited Commercial District includes areas of mixed, light commercial and residential
uses, which should not be developed as intensively as the General Development Districts. This
district includes areas of two or more contiguous acres in size devoted to a mix of residential
and low intensity business and commercial uses. Industrial uses are prohibited.
D. General Development I District.
The General Development I District includes the following types of existing, intensively developed
areas:
12
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(1) Areas of two or more contiguous acres devoted to commercial, industrial or intensive
recreational activities, or a mix of such activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade and service activities, or
other commercial activities; and
(c) Areas devoted to intensive recreational development and activities, such as, but not
limited to amusement parks, race tracks and fairgrounds.
(2) Areas otherwise discernible as having patterns of intensive commercial, industrial
or recreational uses.
E. General Development II District.
The General Development II District includes the same types of areas as those listed for the
General Development I District. The General Development II District, however, shall be applied
to newly established General Development Districts where the pattern of development at the time
of adoption is undeveloped or not as intensively developed as that of the General Development I
District.
Portions of the General Development District I or II may also include residential
development. However, no area shall be designated as a General Development I or II District
based solely on residential use.
F. Commercial Fisheries/Maritime Activities District.
The Commercial Fisheries/Maritime Activities District includes areas where the existing
predominant pattern of development is consistent with the allowed uses for this district as indicated
in the Table of Land Uses, Section 14, and other areas which are suitable for functionally water-
dependent uses, taking into consideration such factors as:
(1) Shelter from prevailing winds and waves;
(2) Slope of the land within 250 feet, horizontal distance, of the shoreline;
(3) Depth of the water within 150 feet, horizontal distance, of the shoreline;
(4) Available support facilities including utilities and transportation facilities; and
(5) Compatibility with adjacent upland uses.
13
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
14. Table of Land Uses.
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform with
all of the applicable land use standards in Section 15. The district designation for a particular site
shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land use
standards)
No - Prohibited
PB - Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection
GD - General Development I and General Development II
LR - Limited Residential
CFMA - Commercial Fisheries/Maritime Activities
LC - Limited Commercial
NOTE: Terms are defined in Section 17, including but not limited to: functionally water-
dependent uses.
14
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
RP
LR
LC
GD
CFMA
1.
Non-intensive recreational uses not requiring structures such as hunting, fishing and
hiking
yes
yes
yes
yes
yes
2.
Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
yes
3.
Clearing or removal of vegetation for activities other than timber harvesting
CEO1
yes
yes
yes
yes
4.
Fire prevention activities
yes
yes
yes
yes
yes
5.
Wildlife management practices
yes
yes
yes
yes
yes
6.
Soil and water conservation practices
yes
yes
yes
yes
yes
7.
Mineral exploration
yes2
yes2
yes2
yes2
yes2
8.
Mineral extraction including sand and gravel extraction
PB3
PB
PB
PB
PB
9.
Surveying and resource analysis
yes
yes
yes
yes
yes
10.
Emergency operations
yes
yes
yes
yes
yes
11.
Agriculture
PB
yes
yes
yes
yes
12.
Aquaculture
PB
PB
PB
PB
PB
13.
Principal structures and uses
A.
One and two family residential, including driveways
PB9
CEO
CEO
CEO
no
B.
Multi-unit residential
no
PB
PB
PB
no
C.
Commercial
no10
no10
PB
PB
PB5
D.
Industrial
no
no
no
PB
PB5
E.
Governmental and institutional
no
PB
PB
PB
PB5
F.
Small non-residential facilities for educational, scientific, or nature interpretation
purposes
PB
CEO
CEO
CEO
PB5
14.
Structures accessory to allowed uses
PB
CEO
CEO
yes
yes
15.
Piers, docks, wharfs, bridges and other structures and uses extending or located
below the normal high-water line or within a wetland
a.
Temporary
b.
Permanent
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB5
16.
Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
LPI
no
17.
Home occupations
PB
PB
CEO
yes
yes
18.
Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
LPI
19.
Essential services
A.
Roadside distribution lines (34.5kV and lower)
CEO6
yes12
yes12
yes12
yes12
B.
Non-roadside or cross-country distribution lines involving ten poles or less in the
shoreland zone
PB6
CEO
CEO
CEO
CEO
C.
Non-roadside or cross-country distribution lines involving eleven or more poles in
the shoreland zone
PB6
PB
PB
PB
PB
D.
Other essential services
PB6
PB
PB
PB
PB
20.
Service drops, as defined, to allowed uses
yes
yes
yes
yes
yes
21.
Public and private recreational areas involving minimal structural development
PB
PB
CEO
CEO
CEO5
22.
Individual private campsites
CEO
CEO
CEO
CEO
CEO
23.
Campgrounds
no7
PB
PB
PB
no
24.
Road construction
no8
PB
PB
PB
PB5
25.
Parking facilities
no7
PB
PB
PB
PB5
26.
Marinas
no
PB
PB
PB
PB
27.
Filling and earth moving of <10 cubic yards
CEO
yes
yes
yes
yes
28.
Filling and earth moving of >10 cubic yards
PB
CEO
CEO
CEO
CEO
29.
Signs
yes
yes
yes
yes
yes
30.
REPEALED-Forest management activities except for timber harvesting & land
management roads
yes
yes
yes
yes
yes
31.
REPEALED-Timber harvesting
CEO13
yes
yes
yes
yes
32.
REPEALED Land management roads
PB13
PB
PB
PB
PB
33.
Uses similar to allowed uses
CEO
CEO
CEO
CEO
CEO
34.
Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
CEO
35.
Uses similar to uses requiring a PB permit
PB
PB
PB
PB
PB
1In RP the cutting or removal of vegetation shall be limited to that which is necessary for allowed uses.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only.
6See further restrictions in Section 15(L).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
8Except as provided in Section 15(H).
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16(E), Special Exceptions. Two-family
residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds that are allowed in the respective district.
15
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to 38
M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great pond, river, stream or brook and
operates in such a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
15. Land Use Standards.
All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
A. Minimum Lot Standards
(1)
(a) Residential per dwelling unit
(i) Within the Shoreland Zone
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
Adjacent to Tidal Areas
(ii) Within the Shoreland Zone
40,000
150
Adjacent to Non-Tidal Areas
40,000
200
(b) Governmental, Institutional, Commercial or Industrial per principal structure
(i) Within the Shoreland Zone
Adjacent to Tidal Areas, Exclusive
of Those Areas Zoned for
Commercial Fisheries and
Maritime Activities
(ii) Within the Shoreland Zone
40,000
200
Adjacent to Tidal Areas Zoned
for Commercial Fisheries and
Maritime Activities
(iii) Within the Shoreland Zone
NONE
NONE
Adjacent to Non-tidal Areas
(c) Public and Private Recreational Facilities
(i) Within the Shoreland Zone Adjacent
to Tidal and Non-Tidal Areas
60,000
40,000
300
200
(2) Land below the upland edge of a wetland and land beneath roads serving more than two
(2) lots shall not be included toward calculating minimum lot area.
16
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(3) Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on
both sides thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the upland edge of a wetland shall be equal to or greater than the shore frontage
requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial
or industrial structure or use, or combination thereof, is constructed or established on a
single parcel, all dimensional requirements shall be met for each additional dwelling unit,
principal structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least seventy-five (75) feet,
horizontal distance, from the normal high-water line of tributary streams or the upland edge
of a wetland, and in the Commercial Fisheries/Maritime Activities District there shall be no
minimum setback. In the Resource Protection District the setback requirement shall be 250
feet, horizontal distance, except for structures, roads, parking spaces or other regulated
objects specifically allowed in that district in which case the setback requirements specified
above shall apply.
NOTE: The Natural Resources Protection Act, 38 M.S.R.A. sections 480-A through 480-HH, requires
the Department of Environmental Protection to designate areas of "significant wildlife habitat".
Permitting under the Natural Resources Protection Act for activities adjacent to significant
wildlife habitat areas may require greater setbacks. Contact your local Department
of Environmental Protection office to see if additional permitting is required.
In addition:
(a) The tributary stream or wetland setback provision shall neither apply to structures
which require direct access to the wetland as an operational necessity, such as piers,
docks and retaining walls, nor to other functionally water-dependent uses.
(b) For principal structures, water and wetland setback measurements shall be taken from
the top of a coastal bluff that has been identified on Coastal Bluff maps as being "highly
unstable" or "unstable" by the Maine Geological Survey pursuant to its "Classification
of Coastal Bluffs" and published on the most recent Coastal Bluff map. If the applicant
and the permitting official(s) are in disagreement as to the specific location of a "highly
unstable" or "unstable" bluff, or where the top of the bluff is located, the applicant may
at his or her expense, employ a Maine Registered Professional Engineer, a Maine
Certified Soil Scientist, a Maine State Geologist, or other qualified individual to make a
determination. If agreement is still not reached, the applicant may appeal the matter to
the board of appeals.
17
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(c) On a nonconforming lot of record on which only a residential structure exists, and it is not
possible to place an accessory structure meeting the required tributary stream or wetland
setbacks, the code enforcement officer may issue a permit to place a single accessory
structure, with no utilities, for the storage of yard tools and similar equipment. Such
accessory structure shall not exceed eighty (80) square feet in area nor eight (8) feet in
height, and shall be located as far from the shoreline as practical and shall meet all other
applicable standards, including non-vegetated surfaces and vegetation clearing limitations.
In no case shall the structure be located closer to the shoreline or tributary stream than the
principal structure.
NOTE: Refer to Section 17 for definitions of coastal wetland and tributary stream.
(d) All new principal and accessory structures shall be set back at least ten (10) feet from all lot
lines and thirty-five (35) feet from the center line of any State or town/municipal road.
(2) Principal or accessory structures and expansions of existing structures which are permitted in
the Resource Protection, Limited Residential, and Limited Commercial, Districts, shall not
exceed thirty-five (35) feet in height.
(a) This provision shall not apply to structures such as transmission towers,
windmills, antennas, and similar structures having no floor area.
(b) The height of a structure shall exclude a nonhabitable feature mounted on a structure
roof for observation purposes, such as a cupola, a dome or a widow's walk, provided the
following conditions are met:
(i) the feature is being added to, or is part of, a conforming structure,
(ii) the structure is not located in a Resource Protection District,
(iii) the feature does not extend beyond the exterior walls of the structure,
(iv) the feature has a floor area of fifty-three (53) square feet or less, and
(v) the feature does not increase the height the structure, as defined, more than seven
(7) feet.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of
record, or in the absence of these, the flood as defined by soil types identified as recent
floodplain soils. Accessory structures may be placed in accordance with the standards of the
Floodplain Management Ordinance that is consistent with the April 2005 or later version
under the National Flood Insurance Program.
(4) Except in the shoreland zone of coastal wetlands that are designated as General Development or
Commercial Fisheries/Maritime Activities Districts, non-vegetated surfaces shall not exceed
twenty (20) percent of the portion of the lot located within the shoreland zone. In the shoreland
zone of coastal wetlands that are designated as General Development or Commercial
Fisheries/Maritime Activities Districts, non-vegetated surfaces shall not exceed seventy (70)
percent of the portion of the lot within the shoreland zone. Non-vegetated surfaces include, but
are not limited to the following: structures, driveways, parking areas, and other areas from which
vegetation has been removed. Naturally occurring ledge and rock outcroppings are not
18
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
counted as non-vegetated surfaces for lots that were recorded on March 24, 1990, and
that have been in continuous existence since that date.
Section 15(B)(4) shall not apply to public boat launching facilities, regardless of the district
in which the facility is located.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the
following conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is (are) at least 25 feet, horizontal distance, from the normal high-water line
of a tributary stream or upland edge of a wetland;
(b) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized
with vegetative plantings;
(c) The total height of the wall(s), in the aggregate, is no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on coastal wetlands, and
tributary streams, as designated on the Federal Emergency Management Agency's
(FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of
record, or in the absence of these, by soil types identified as recent floodplain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a tributary stream or upland edge of a wetland when a natural buffer
area does not exist. The buffer area must meet the following characteristics:
(i)
The buffer must include shrubs and other woody and herbaceous vegetation.
Where natural ground cover is lacking the area must be supplemented with leaf or
bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide
for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the buffer.
19
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal distance, of
a tributary stream or coastal wetland, a permit pursuant to the Natural Resource
Protection Act is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the Code Enforcement Officer, to provide shoreline access in areas of steep
slopes or unstable soils provided: that the structure is limited to a maximum of four (4) feet in
width; that the structure does not extend below or over the upland edge of a wetland, (unless
permitted by the Department of Environmental Protection pursuant to the Natural Resources
Protection Act, 38 M.R.S.A. section 480-C); and that the applicant demonstrates that no
reasonable access alternative exists on the property.
NOTE: New permanent structures, and expansions thereof, projecting into or over water bodies shall
require a permit from the Department of Environmental Protection pursuant to the Natural
Resources Protection Act, 38 M.R.S.A. section 480-C. Permits may also be required from
the Army Corps of Engineers if located in navigable waters.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within a Wetland, and Shoreline
Stabilization.
(1) No more than one pier, dock, wharf or similar structure extending or located below the normal
high-water line of a water body or within a wetland is allowed on a single lot.
(2) Access from shore shall be developed on soils appropriate for such use and constructed so
as to control erosion.
(3) The location shall not interfere with existing developed or natural beach areas.
(4) The facility shall be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or
wharf in non-tidal waters shall not be wider than six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending or located below the shoreline unless the structure requires direct
access to the wetland as an operational necessity.
NOTE: A structure constructed on a float or floats is prohibited unless it is designed to function as, and
is registered with the Maine Department of Inland Fisheries and Wildlife as, a watercraft.
(7) New permanent piers and docks on non-tidal waters shall not be permitted unless it is
clearly demonstrated to the Planning Board that a temporary pier or dock is not feasible, and
a permit has been obtained from the Department of Environmental Protection, pursuant to
the Natural Resources Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure
20
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
extending or located below the shoreline shall be converted to residential dwelling units in
any district.
21
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(9) Except in the General Development Districts and Commercial Fisheries/Maritime Activities
District, structures built on, over or abutting a pier, wharf, dock or other structure extending or
located below the shoreline shall not exceed twenty (20) feet in height above the pier, wharf,
dock or other structure.
NOTE: New permanent structures, and expansions thereof, projecting into or over water bodies shall
require a permit from the Department of Environmental Protection pursuant to the Natural
Resources Protection Act, 38 M.R.S.A. section 480-C. Permits may also be required from
the Army Corps of Engineers if located in navigable waters.
(10) The Planning Board may approve shoreline stabilization of an eroding shoreline,
provided that the following requirements are met:
(a) Construction equipment must access the shoreline by barge when feasible, as
determined by the Planning Board.
(b) When necessary, the removal of vegetation to allow for construction equipment access
to the stabilization site via land must be limited to no more than twelve (12) feet in
width. When the shoreline stabilization is complete, the construction equipment access
way must be restored.
(b) Any restoration or revegetation shall occur in accordance with Section 15(S).
NOTE: A permit pursuant to the Natural Resources Protection Act is required from the Department
of Environmental Protection for shoreline stabilization activities.
D. Campgrounds.
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation shall not
be included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of seventy-five (75) feet, horizontal distance,
from the normal high-water line of tributary streams or the upland edge of a wetland.
E. Individual Private Campsites.
Individual private campsites not associated with campgrounds are allowed provided the following
conditions are met:
(1) On a vacant lot, one campsite per lot existing on the effective date of this Ordinance, or
thirty thousand (30,000) square feet of lot area within the shoreland zone, whichever is less,
may be permitted.
(2) On a lot that contains a principal use or structure, the lot shall contain the minimum lot
dimensional requirements for that principal use or structure separately from the thirty thousand
22
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(30,000) square feet of lot area within the shoreland zone required per individual
private campsite.
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or
tent platform, shall be set back seventy-five (75) feet, horizontal distance, from the
normal high-water line of tributary streams or the upland edge of a wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no structure
except a canopy shall be attached to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter
in a Resource Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or
land owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred
and twenty (120) days per year, all requirements for residential structures shall be met,
including the installation of a subsurface sewage disposal system in compliance with the State
of Maine Subsurface Wastewater Disposal Rules unless served by public sewage facilities.
F. Commercial and Industrial Uses--For Future Use:
G. Parking Areas
(1) Parking areas shall meet the shoreline setback requirements for structures for the district in
which such areas are located, except that in the Commercial Fisheries/Maritime Activities
District parking areas shall be set back at least twenty-five (25) feet, horizontal distance,
from the shoreline. The setback requirement for parking areas serving public boat launching
facilities in Districts other than the General Development I District and Commercial
Fisheries/Maritime Activities District shall be no less than fifty (50) feet, horizontal
distance, from the shoreline if the Planning Board finds that no other reasonable alternative
exists further from the shoreline or tributary stream
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a tributary stream or wetland and where
feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
23
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
H. Roads and Driveways.
The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least seventy-five (75) feet, horizontal distance from
the normal high-water line of tributary streams or the upland edge of a wetland unless no
reasonable alternative exists as determined by the Planning Board. If no other reasonable
alternative exists, the road and/or driveway setback requirement shall be no less than fifty (50)
feet, horizontal distance, upon clear showing by the applicant that appropriate techniques will
be used to prevent sedimentation of the tributary stream or wetland. Such techniques may
include, but are not limited to, the installation of settling basins, and/or the effective use of
additional ditch relief culverts and turnouts placed so as to avoid sedimentation of the tributary
stream or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline due
to an operational necessity, excluding temporary docks for recreational uses. Roads and
driveways providing access to permitted structures within the setback area shall comply
fully with the requirements of Section 15(H)(1) except for that portion of the road or
driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of
their setback from a tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a tributary stream or upland edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion
and sedimentation control contained in Section 15(T).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering tributary streams
or wetlands, roads and driveways shall be designed, constructed, and maintained to empty onto
an unscarified buffer strip at least (50) feet plus two times the average slope, in width between
the outflow point of the ditch or culvert and the normal high-water line of a tributary stream or
upland edge of a wetland. Surface drainage which is directed to an unscarified buffer strip
shall be diffused or spread out to promote infiltration of the runoff and to minimize
channelized flow of the drainage through the buffer strip.
24
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in
a manner effective in directing drainage onto unscarified buffer strips before the flow
gains sufficient volume or head to erode the road, driveway, or ditch. To accomplish this,
the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade
(Percent)
Spacing
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular to
the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow
for effective functioning, and their inlet and outlet ends shall be stabilized with
appropriate materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis
to assure effective functioning.
I. Signs.
The following provisions shall govern the use of signs in the Resource Protection, Limited
Residential, Limited Commercial, General Development I, General Development II and
Commercial Fisheries/Maritime Activities Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. In the Limited Commercial District, however, such signs shall not exceed sixteen
(16) square feet in area. Signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
25
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to
number provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure
proper functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to
be obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most-at-risk lake watershed, or a project with 1 acre or more
of developed area in any other stream, coastal or wetland watershed. A permit-by-rule is
necessary for a project with one acre or more of disturbed area but less than 1 acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams) and
less than 5 acres of developed area. Furthermore, a Maine Construction General Permit is
required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State
of Maine Subsurface Wastewater Disposal Rules, and the following:
(a) clearing or removal of woody vegetation necessary to site a new system and any associated
fill extensions, shall not extend closer than seventy-five (75) feet, horizontal distance, from the
upland edge of a wetland; and
(b) a holding tank is not allowed for a first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the normal
high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
26
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed in
a Resource Protection District, except to provide services to a permitted use within said
district, or except where the applicant demonstrates that no reasonable alternative exists.
Where allowed, such structures and facilities shall be located so as to minimize any adverse
impacts on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction.
Mineral exploration to determine the nature or extent of mineral resources shall be accomplished by
hand sampling, test boring, or other methods which create minimal disturbance of less than one
hundred (100) square feet of ground surface. A permit from the Code Enforcement Officer shall be
required for mineral exploration which exceeds the above limitation. All excavations, including test
pits and holes, shall be immediately capped, filled or secured by other equally effective measures to
restore disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(3) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall
be permitted within seventy-five (75) feet, horizontal distance, of the normal high-water
line of any tributary stream or the upland edge of a wetland. Extraction operations shall not
be permitted within seventy-five (75) feet, horizontal distance, of any property line without
written permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any extraction
site, which operations shall be deemed complete when less than one hundred (100) cubic yards
of materials are removed in any consecutive twelve (12) month period, ground levels and
grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated on-site may
be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid waste
management rules, Chapters 400-419 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such materials.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
27
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam shall
be obtained from off-site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the former Maine Department of Agriculture on November 1, 2001,
and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within seventy-five (75) feet horizontal distance, of
tributary streams or wetlands. All manure storage areas within the shoreland zone must be
constructed or modified such that the facility produces no discharge of effluent or
contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet
in surface area, within the shoreland zone shall require a Conservation Plan to be filed with
the Planning Board. Nonconformance with the provisions of said plan shall be considered to
be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and
Water Conservation District office.
(4) There shall be no new tilling of soil within seventy-five (75) feet, horizontal distance, from
coastal wetlands; nor within twenty-five (25) feet, horizontal distance, of tributary streams and
freshwater wetlands. Operations in existence on the effective date of this ordinance and not in
conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within seventy-five (75) feet,
horizontal distance, of coastal wetlands; nor within twenty-five (25) feet, horizontal distance, of
tributary streams and freshwater wetlands. Livestock grazing associated with ongoing farm
activities, and which are not in conformance with the above setback provisions may continue,
provided that such grazing is conducted in accordance with a Conservation Plan that has been
filed with the Planning Board.
O. Timber Harvesting - Repealed-Bureau of Forestry will administer all Timber Harvesting
Regulations in the Town of Sorrento.
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District the cutting or removal of vegetation shall be limited to
that which is necessary for uses expressly authorized in that district.
28
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(2) Except in areas as described in Section P(1) above, within a shoreline buffer extending
seventy-five (75) feet, horizontal distance, from any tributary stream or the upland edge of
a wetland, vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from
the outer limits of the tree or shrub crown. However, a single footpath not to exceed six
(6) feet in width as measured between tree trunks and/or shrub stems is allowed for
accessing the shoreline provided that a cleared line of sight to the water through the
shoreline buffer is not created.
(b) Selective cutting of trees within the shoreline buffer is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to tributary streams and
wetlands shall be defined as maintaining a rating score of 16 or more in each 25-foot by
50-foot rectangular (1250 square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Ground Level (inches)
Points
2 < 4 in.
1
4 < 8 in.
2
8 < 12 in.
4
12 in. or greater
8
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the landowner
or lessee proposes clearing within the required buffer;
29
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation
removed except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 1/2) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three
(3) feet in height and other ground cover, including leaf litter and the forest duff layer,
shall not be cut, covered, or removed, except to provide for a footpath as described in
Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain the vegetation in the shoreline buffer, removal of storm-damaged,
hazard or dead trees and any required replanting shall occur in accordance with
Section 15(Q).
(f) In order to maintain the vegetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related
equipment operation, within or outside the shoreline buffer, must comply with the
requirements of Section 15(P)(2).
(3) At distances greater than seventy-five (75) feet, horizontal distance, from the normal high-
water line of any tributary stream or the upland edge of a wetland, there shall be allowed on
any lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of
the volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground
level. Tree removal in conjunction with the development of permitted uses shall be included
in the forty (40) percent calculation. For the purposes of these standards volume may be
considered to be equivalent to basal area.
(4) In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet, whichever
is greater, including land previously cleared. This provision applies to the portion of the lot
within the shoreland zone, including the shoreline buffer area. This provision shall not apply to
the General Development or Commercial Fisheries/Maritime Activities Districts.
30
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(5) Legally existing nonconforming cleared openings may be maintained, in accordance with
Section 15(R). If these areas, fields or other cleared openings have reverted back to
primarily woody vegetation, as a result of not maintaining them in accordance with Section
15(R), then the provisions of Section 15(P) shall apply.
Q. Hazard Trees, Dead Trees and Storm-Damaged Trees
(1) Hazard trees may be removed without a permit after consultation with the Code
Enforcement Officer, provided the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in the
tree canopy greater than two hundred and fifty (250) square feet, the opening shall be
replaced with native tree species, unless there is new tree growth already present near to
where the hazard tree was removed. New tree growth is considered to be at least two (2)
inches in diameter, measured at four and one half (4.5) feet above ground level. If new
growth is not present, then replacement trees shall consist of native species, be at least four
(4) feet in height and be no less than two (2) inches DBH. Stumps shall not be removed.
(b) Outside the shoreline buffer, if the removal of hazard trees results in more than forty (40)
percent of the volume of trees, four (4) inches or more in diameter as measured at four and
one half (4.5) feet above ground level, being removed in any ten (10) year period; or
results in cleared openings of more than twenty-five (25) percent of the lot area within the
shoreland zone or more than ten thousand (10,000) square feet, whichever is greater; then
replacement with native tree species is required, unless there is new tree growth already
present near to where the hazard tree was removed. New tree growth is considered to be at
least two (2) inches DBH. If new growth is not present, then replacement trees shall
consist of native species and be no less than two (2) inches DBH.
(c) The code enforcement officer may require the applicant to submit an evaluation from
a licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
(d) The code enforcement officer may require more than a one-for-one replacement for
removed hazard trees that exceeded eight (8) inches in diameter at four and one half
(4.5) feet above ground level.
(2) Dead trees may be removed without a permit, provided the following requirements are met:
(a) The trees are dead from natural causes. Dead trees are those that contain no foliage
during the growing season.
(b) The removal of dead trees does not result in the creation of new lawn areas or
other permanently cleared areas.
(c) Stumps shall not be removed.
(3) Storm-damaged trees may be removed without a permit after consultation with the
Code Enforcement Officer, provided the following requirements are met:
31
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(a) Within the shoreline buffer, if the removal of storm-damaged trees results in a
cleared opening in the tree canopy greater than two hundred and fifty (250) square
feet, the following shall be required:
(i) The area shall be required to naturally revegetate. If after one growing season, no
natural regeneration or regrowth is present, replanting of native tree seedlings or
saplings shall be required at a density of one seedling/sapling per every eighty
(80) square feet of open canopy.
(ii) The removal of storm-damaged trees does not result in the creation of new lawn
areas or other permanently cleared areas.
(iii) Stumps shall not be removed.
(iv) Limbs damaged from a storm event may be pruned even if they extend beyond
the bottom one-third (1/3) of the tree.
(b) Outside the shoreline buffer, if the removal of storm-damaged trees results in more than
forty (40) percent of the volume of trees, four (4) inches or more in diameter as
measured at four and one half (4.5) feet above ground level, being removed in any ten
(10) year period; or results in cleared openings of more than twenty-five (25) percent of
the lot area within the shoreland zone or more than ten thousand (10,000) square feet,
whichever is greater; then the area shall be required to naturally revegetate. If after one
growing season, no natural regeneration or regrowth is present, replanting of native tree
seedlings or saplings shall be required on a one-for-one basis.
R. Exemptions to Section 15(P)
The following activities are exempt from the standards for clearing or removal of vegetation set
forth in Section 15(P), provided that all other applicable requirements of this Ordinance
are complied with, and the removal of vegetation is limited to that which is necessary:
(1) The clearing or removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the standards of Section 15(P),
such as but not limited to cleared openings in the canopy or fields. If any of these areas revert
back to primarily woody vegetation, due to a lack of removal of vegetation every two (2)
years, the requirements of Section 15(P) shall apply.
(2) The clearing or removal of vegetation from the location of allowed structures or allowed
uses, when the shoreline setback requirements of Section 15(B) are not applicable.
(3) The clearing or removal of vegetation from the location of public swimming areas
associated with allowed public recreational facilities.
(4) The clearing or removal of vegetation associated with allowed agricultural uses, provided
that all requirements of Section 15(N) are complied with, and that best management
practices are utilized.
32
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(5) The clearing or removal of vegetation associated with brownfields or voluntary response action
program projects pursuant to 38 M.R.S.A section 343-E, provided that the
following provisions are met:
(a) The clearing or removal of vegetation is within the shoreland zone of a coastal wetland
that is designated as a General Development Commercial Fisheries / Maritime Activities
District; and
(b) The clearing or removal of vegetation is necessary for remediation activities to clean
up contamination.
(6) The clearing or removal of non-native invasive vegetation, provided that the
following requirements are met:
(a) If clearing or removal of vegetation occurs via wheeled or tracked motorized equipment,
then the wheeled or tracked motorized equipment is operated and stored at least twenty-
five (25) feet, horizontal distance, from the shoreline, except that the wheeled or tracked
motorized equipment may be operated or stored on existing structural surfaces, such as
pavement or gravel;
(b) The clearing or removal of vegetation within twenty-five (25) feet, horizontal
distance, from the shoreline occurs via hand tools; and
(c) If the clearing or removal of non-native invasive vegetation results in a standard of
Section 15(P) being exceeded, then the area shall be revegetated in accordance with
Section 15(S) to achieve compliance with the applicable standard(s) of Section 15(P).
NOTE: An updated list of non-native invasive vegetation is maintained by the Department
of Agriculture, Conservation and Forestry's Natural Areas Program.
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
(7) The clearing or removal of vegetation associated with emergency response activities
conducted by the Department, the U.S. Environmental Protection Agency, the U.S. Coast
Guard, and their agents.
S. Revegetation Requirements
When revegetation is required to address the removal of non-native invasive species of vegetation,
to address removal of vegetation in conjunction with shoreline stabilization, in response to
violations of the standards set forth in Section 15(P), or as a mechanism to allow for development
that may otherwise not be permissible due to the standards of Section 15(P), then revegetation shall
comply with the following requirements:
(1) The applicant must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include a
scaled site plan, depicting where vegetation was, or is to be removed, where existing
vegetation is to remain, and where vegetation is to be planted, including a list of all
vegetation to be planted.
33
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(2) Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed, and must occur at a density comparable to the pre-existing
vegetation. If this is not feasible due to shoreline stabilization, then revegetation must occur
along the same segment of shoreline and as close as possible to the area where vegetation
was removed.
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If
the activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must consist of saplings at a minimum;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different
species shall be used;
(d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for shoreline stabilization, and it is not possible to plant trees
and saplings in the same area where trees or saplings were removed, then trees or
saplings must be planted in a location that effectively reestablishes the screening
between the shoreline and structures; and
(f) A survival rate of at least eighty (80) percent of planted trees/saplings is required for
a minimum of five (5) years.
(5) Revegetation activities must meet the following requirements for all woody vegetation and
for other vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced
with native noninvasive species of woody vegetation and vegetation under three (3)
feet in height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantities and variety sufficient to prevent erosion and provide for effective infiltration
of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three
(3) different species shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody
vegetation plants; and
(e) Survival of planted woody vegetation and vegetation less than three feet in height must
be sufficient to remain in compliance with the standards contained in Section 15(P) for
a minimum of five (5) years.
34
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(6) Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and provide
for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, the area must be supplemented
with leaf mulch and/or bark mulch at a minimum of four (4) inches deep to prevent
erosion and provide for effective infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to
remain in compliance with the standards contained within this Ordinance for a minimum
of five (5) years.
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which result
in unstabilized soil conditions and which require a permit shall also require a written soil
erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or riprap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months
of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
35
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainage ways shall be designed and constructed in order
to carry water from a twenty five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
(6) When an excavation contractor will perform these activities, compliance with the
following shall be required:
(a) A person certified in erosion control practices by the Maine Department of Environmental
Protection shall be responsible for management of erosion and sedimentation control
practices at the site. This person shall be present at the site each day these activities occur
for a duration that is sufficient to ensure that proper erosion and sedimentation control
practices are followed. This is required until installation of erosion and sedimentation
control measures that will either stay in place permanently or stay in place until the area is
sufficiently covered with vegetation necessary to prevent soil erosion.
(b) Include on the required plan or permit application, the name and certification number of
the person who will oversee activities causing or resulting in soil disturbance.
U. Soils.
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe erosion,
mass soil movement, improper drainage, and water pollution, whether during or after construction.
Proposed uses requiring subsurface waste disposal, and commercial or industrial development and
other similar intensive land uses, shall require a soils report based on an on-site investigation and be
prepared by state-certified professionals. Certified persons may include Maine Certified Soil
Scientists, Maine Registered Professional Engineers, Maine State Certified Geologists and other
persons who have training and experience in the recognition and evaluation of soil properties. The
report shall be based upon the analysis of the characteristics of the soil and surrounding land and
water areas, maximum ground water elevation, presence of ledge, drainage conditions, and other
pertinent data which the evaluator deems appropriate. The soils report shall include
recommendations for a proposed use to counteract soil limitations where they exist.
V. Water Quality.
No activity shall deposit on or into the ground or discharge to the waters of the State any pollutant
that, by itself or in combination with other activities or substances, will impair designated uses or
the water classification of the tributary stream or wetland.
W. Archaeological Site.
Any proposed land use activity involving structural development or soil disturbance on or adjacent
to sites listed on, or eligible to be listed on the National Register of Historic Places, as determined
by the permitting authority, shall be submitted by the applicant to the Maine Historic Preservation
Commission for review and comment, at least twenty (20) days prior to action being taken by the
permitting authority. The permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
36
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
NOTE: Municipal officials should contact the Maine Historic Preservation Commission for the
listing and location of Historic Places in their community.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or
reappointed annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions
of 30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of
State law.
B. Permits Required.
After the effective date of this Ordinance no person shall, without first obtaining a permit, engage
in any activity or use of land or structure requiring a permit in the district in which such activity
or use would occur; or expand, change, or replace an existing use or structure; or renew a
discontinued nonconforming use. A person who is issued a permit pursuant to this Ordinance
shall have a copy of the permit on site while the work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as the CEO is
notified and:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1
or level 2 approved list, and unreasonable erosion and sedimentation is prevented by
means of adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application and Fees.
(1) Every applicant for a permit shall submit a written application, including a scaled site plan, on
a form provided by the municipality, to the appropriate official as indicated in Section 14.
37
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that the
information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board,
as appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the
Plumbing Inspector, shall be submitted whenever the nature of the proposed structure or
use would require the installation of a subsurface sewage disposal system.
(5) The application for a permit shall be accompanied by an application fee in such amount as the
Board of Selectmen may by rule from time to time establish. The fee schedule will be provided
to the applicant by the Code Enforcement Officer. Fees shall be established sufficient to cover
the cost to the Town in administering the provisions of the ordinance.
(6) An additional fee may be charged if the Planning Board and /or the Board of Appeals require
the assistance of a professional engineer or other expert. The expert's fee shall be paid in full
by the applicant within ten days after the Town submits an estimate for services.
D. Procedure for Administering Permits.
Within 35 days of the date of receiving a written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that the
application is a complete application, or, if the application is incomplete, that specified additional
material is needed to make the application complete. The Planning Board or the Code Enforcement
Officer, as appropriate, shall approve, approve with conditions, or deny all permit applications in
writing within 35 days of receiving a completed application. However, if the Planning Board has a
waiting list of applications, a decision on the application shall occur within 35 days after the first
available date on the Planning Board's agenda following receipt of the completed application, or
within 35 days of the public hearing, if the proposed use or structure is found to be in conformance
with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve
an application or approve it with conditions if it makes a positive finding based on the
information presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
38
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland and
coastal waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will not adversely affect existing commercial fishing or maritime activities in a
Commercial Fisheries/Maritime Activities district;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall
be stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
E. Special Exceptions.
In addition to the criteria specified in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential structure
in a Resource Protection District provided that the applicant demonstrates that all of the
following conditions are met:
(1) There is no location on the property, other than a location within the Resource
Protection District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the velocity zone in areas subject to tides, based on detailed flood
insurance studies and as delineated on the Federal Emergency Management Agency's
Flood Boundary and Floodway Maps and Flood Insurance Rate Maps; all buildings,
including basements, are elevated at least one foot above the 100-year floodplain
elevation; and the development is otherwise in compliance with any applicable municipal
floodplain ordinance.
(4) The total footprint, as defined, is limited to a maximum of 1,500 square feet. This
limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a tributary stream or upland edge of a wetland to the greatest practical
39
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
extent, but not less than 75 feet, horizontal distance. In determining the greatest practical
extent, the Planning Board shall consider the depth of the lot, the slope of the land, the
potential for soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the floodplain, and its proximity to moderate-value
and high-value wetlands.
F. Expiration of Permit.
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made within
one year of the issuance of the permit, the applicant shall have one additional year to complete
the project, at which time the permit shall expire.
G. Installation of Public Utility Service.
A public utility, water district, sanitary district or any utility company of any kind may not install
services to any new structure located in the shoreland zone unless written authorization attesting
to the validity and currency of all local permits required under this or any previous Ordinance has
been issued by the appropriate municipal officials or other written arrangements have been made
between the municipal officials and the utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the
following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code Enforcement
Officer in his or her review of and action on a permit application under this Ordinance. Any
order, requirement, decision or determination made, or failure to act, in the enforcement of
this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth
in this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited to,
lot width, structure height, percent of non-vegetated surfaces, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by
this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
40
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the nonconformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance
is granted;
b. That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the
locality; and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, in accordance with 30-A M.R.S.A section
4353-A, the Code Enforcement Officer may approve a permit to the owner of a residential
dwelling unit for the purpose of making that dwelling accessible to a person with a disability
who resides in or regularly uses that dwelling. The permit is deemed to include the variance,
which shall be solely for installation of equipment or the construction of structures
necessary for access to or egress from the dwelling by the person with the disability. The
Code Enforcement Officer may impose conditions on the permit, including limiting the
permit to the duration of the disability or to the time that the person with the disability lives
in the dwelling. The term "structures necessary for access to or egress from the dwelling"
shall include ramps and associated railing, and wall or roof systems necessary for the safety
or effectiveness of the structure. Such permitting is subject to Sections 16(H)(2)(f) and
16(H)(4)(b)(iv) below.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the Commissioner
of the Department of Environmental Protection at least twenty (20) days prior to action by the
Board of Appeals. Any comments received from the Commissioner prior to the action by the
Board of Appeals shall be made part of the record and shall be taken into consideration by the
Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board of
41
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Appeals shall hear and decide the matter afresh, undertaking its own independent analysis
of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the decision
was contrary to specific provisions of the Ordinance or contrary to the facts presented to the
Planning Board. The Board of Appeals may only review the record of the proceedings before
the Planning Board. The Board Appeals shall not receive or consider any evidence which was
not presented to the Planning Board, but the Board of Appeals may receive and consider written
or oral arguments. If the Board of Appeals determines that the record of the Planning Board
proceedings is inadequate, the Board of Appeals may remand the matter to the Planning Board
for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the
official, written decision appealed from, and not otherwise, except that the Board,
upon a showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board
of Appeals all of the papers constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete
written application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
42
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(iii) The Board shall decide all administrative appeals and variance appeals within
thirty five (35) days after the close of the hearing, and shall issue a written
decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board shall
cause written notice of its decision to be mailed or hand-delivered to the applicant
and to the Department of Environmental Protection within seven (7) days of the
Board's decision. Copies of written decisions of the Board of Appeals shall be given
to the Planning Board, Code Enforcement Officer, and the municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of
Appeals may take an appeal to Superior Court in accordance with State laws within forty-five
(45) days from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals
may reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board to reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and
be completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other parties of interest, including abutters and
those who testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this Ordinance
is being violated, he or she shall notify in writing the person responsible for such violation,
indicating the nature of the violation and ordering the action necessary to correct it,
including discontinuance of illegal use of land, buildings or structures, or work being
done, removal of illegal buildings or structures, and abatement of nuisance conditions. A
copy of such notices shall be submitted to the municipal officers and be maintained as a
permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to ensure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
43
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted
or denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code Enforcement
Officer, are hereby directed to institute any and all actions and proceedings, either legal or
equitable, including seeking injunctions of violations and the imposition of fines, that may be
appropriate or necessary to enforce the provisions of this Ordinance in the name of the
municipality. The municipal officers, or their authorized agent, are hereby authorized to enter
into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not allow an illegal
structure or use to continue unless there is clear and convincing evidence that the illegal structure
or use was constructed or conducted as a direct result of erroneous advice given by an authorized
municipal official and there is no evidence that the owner acted in bad faith, or unless the
removal of the structure or use will result in a threat or hazard to public health and safety or will
result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation
for each day that the violation continues. However, in a resource protection district the
maximum penalty is increased to $5000 (38 M.R.S.A. section 4452).
17. Definitions
Accessory structure or use - a use or structure which is incidental and subordinate to the principal
use or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A
deck or similar extension of the principal structure or a garage attached to the principal structure by a
roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit
or variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants or animals,
including but not limited to: forages and sod crops, grains and seed crops, dairy animals and dairy
products, poultry and poultry products, livestock, fruits and vegetables, and ornamental green-house
products. Agriculture does not include forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
44
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of
bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft,
and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation and Forestry, Bureau
of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Coastal wetland - all tidal and subtidal lands; all lands with vegetation present that is tolerant of salt
water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh, bog, beach,
flat or other contiguous low land that is subject to tidal action during the highest tide level for the
year in which an activity is proposed as identified in tide tables published by the National Ocean
Service. Coastal wetlands may include portions of coastal sand dunes.
NOTE: All areas below the highest annual tide level are coastal wetlands. These areas may consist of
rocky ledges, sand and cobble beaches, mud flats, etc., in addition to salt marshes and salt meadows.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling of
goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
Development - a change in land use involving alteration of the land, water or vegetation, or
the addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but
not limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness;
45
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
and also includes the physical or mental condition of a person which constitutes a substantial
handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or
psychologist, as well as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two
single-family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines,
collection or supply systems; and associated storage tanks. Such systems may include towers, poles,
wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals,
hydrants and similar accessories, but shall not include service drops or buildings which are
necessary for the furnishing of such services.
Excavation contractor - an individual or firm that either is engaged in a business that causes the
disturbance of one or more cubic yards of soil, or is in a business in which the disturbance of one or
more cubic yards of soil results from an activity that the individual or firm is retained to perform.
Disturbance includes: grading, filling, and removal. A person or firm engaged in agriculture or timber
harvesting activities is not considered an excavation contractor as long as best management practices
for erosion and sedimentation control are used. Municipal, state and federal employees engaged in
projects associated with that employment are not considered excavation contractors.
Expansion of a structure - an increase in the footprint of a structure, including all extensions such
as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of
more footprint or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint - the entire area of ground covered by the structure(s) on a lot, including but not limited to:
cantilevered or similar overhanging extensions, as well as unenclosed structures such as patios
and decks.
46
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters
tall (approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frostwalls, or other base consisting of concrete,
block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than
forested wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to
a surface water, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to
the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that can
not be located away from these waters. The uses include, but are not limited to commercial and
recreational fishing and boating facilities, finfish and shellfish processing, fish-related storage and
retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat
building facilities, marinas, navigation aids, basins and channels, shoreline structures necessary for
erosion control purposes, industrial uses dependent upon water-borne transportation or requiring large
volumes of cooling or processing water that can not reasonably be located or operated at an inland
site, and uses that primarily provide general public access to coastal or inland waters. Recreational
boat storage buildings are not considered to be a functional water-dependent use.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
47
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a structural
defect that under the normal range of environmental conditions at the site exhibits a high probability of
failure and loss of a major structural component of the tree in a manner that will strike a target. A
normal range of environmental conditions does not include meteorological anomalies, such as, but not
limited to: hurricanes, hurricane-force winds, tornados, microbursts, or significant ice storm events.
Hazard trees also include those trees that pose a serious and imminent risk to bank stability. A target is
the area where personal injury or property damage could occur if the tree or a portion of the tree fails.
Targets include roads, driveways, parking areas, structures, campsites, and any other developed area
where people frequently gather and linger.
Height of a structure - the vertical distance between the mean original (prior to construction) grade
at the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a residential
structure or property and which is 1) clearly incidental to and compatible with the residential use of
the property and surrounding residential uses; and 2) which employs no more than two (2) persons
other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes further
deviation from the dimensional standard(s) creating the nonconformity such as, but not limited to,
reduction in tributary stream or wetland setback distance, increase in non-vegetated surfaces, or increase
in height of a structure. Property changes or structure expansions which either meet the dimensional
standard or which cause no further increase in the linear extent of nonconformance of the existing
structure shall not be considered to increase nonconformity. For example, there is no increase in
nonconformity with the setback requirement for wetlands or tributary streams if the expansion extends no
further into the required setback area than does any portion of the existing nonconforming structure.
Hence, a structure may be expanded laterally provided that the expansion extends no closer to the
tributary stream or wetland than the closest portion of the existing structure from that tributary stream or
wetland. Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which
is developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for
public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
upland edge of a wetland and areas beneath roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
48
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than one
hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like material
from its natural location and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot
lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling
units.
Native - indigenous to the local forests.
Nonconforming condition - nonconforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Nonconforming lot - a single lot of record which, at the effective date of adoption or amendment
of this Ordinance, does not meet the area, frontage, or width requirements of the district in which
it is located.
Nonconforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, non-vegetated surfaces or footprint, but which is
allowed solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect.
Nonconforming use - use of buildings, structures, premises, land or parts thereof which is not allowed
in the district in which it is situated, but which is allowed to remain solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation - species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to
Maine ecosystems.
49
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Normal high-water line (non-tidal waters) - that line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land.
NOTE: Adjacent to tidal waters, setbacks are measured from the upland edge of the "coastal wetland."
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending or located below the
normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than seven (7) months in any
period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or more in
any period of twelve (12) consecutive months.
Principal structure - a structure other than one which is used for purposes wholly incidental
or accessory to the use of another structure or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
Recent floodplain soils - the following soil series as described and identified by the
National Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle
and not as a structure, the unit must remain with its tires on the ground, and must be registered with
the State Division of Motor Vehicles.
50
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a
driveway as defined.
Salt marsh - Areas of coastal wetland (most often along coastal bays) that support salt tolerant
species, and where at average high tide during the growing season, the soil is irregularly inundated
by tidal waters. The predominant species is saltmarsh cordgrass (Spartina alterniflora). More open
areas often support widgeon grass, eelgrass, and Sago pondweed.
Salt meadow - Areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of salt marshes or open coastal water, where the soil is saturated during the growing
season but which is rarely inundated by tidal water. Indigenous plant species include salt meadow
cordgrass (Spartina patens) and black rush; common threesquare occurs in fresher areas.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above
ground level.
Service drop - any utility line extension provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon
the premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires
to existing utility poles, or
51
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
b. the extension requiring the installation of new utility poles or placement underground is
less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a tributary stream or
upland edge of a wetland, to the nearest part of a structure, road, parking space or other regulated
object or area.
Shore frontage - the length of a lot bordering on a wetland measured in a straight line between
the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance,
of the upland edge of a coastal wetland, including all areas affected by tidal action; or within 250 feet
of the upland edge of a freshwater wetland.
Shoreline - the normal high-water line, or upland edge of a freshwater or coastal wetland.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or
remains standing, and is damaged beyond the point of recovery as a result of a storm event.
Structure - whether temporary or permanent: anything located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind; anything built,
constructed or erected on or in the ground. The term structure includes decks, patios, and satellite
dishes. Structure does not include fences; poles; wiring, guy wires, guy anchors and other aerial
equipment normally associated with service drops; subsurface waste water disposal systems as
defined in Title 30-A, section 4201, subsection 5; geothermal heat exchange wells as defined in Title
32, section 4700-E, subsection 3-C; and wells or water wells as defined in Title 32, section 4700-E,
subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as
a percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal
sewer or waste water treatment system.
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
52
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Tidal waters - all waters affected by tidal action during the highest annual tide.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of vegetation in the shoreland zone associated with
any other land use activity, and the cutting or removal of trees in the shoreland zone on a lot that has
less than two (2) acres within the shoreland zone, shall not be considered timber harvesting. Such
cutting or removal of vegetation shall be regulated pursuant to Section 15 (P), Clearing or Removal of
Vegetation for Activities Other Than Timber Harvesting.
.
Tree - a woody perennial plant that has a well-defined trunk(s) at least two (2) inches in diameter at
four and one half (4.5) feet above the ground, that has a more or less definite crown and that reaches
a height of at least ten (10) feet at maturity.
Tributary stream - means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with a wetland. "Tributary stream" does not include rills or gullies forming
because of accelerated erosion in disturbed soils where the natural vegetation cover has been removed
by human activity. This definition only applies to that portion of the tributary stream located within
the shoreland zone of the receiving wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or the
highest annual tide level, including all areas affected by tidal action. For purposes of a freshwater
wetland, the upland edge is formed where the soils are not saturated for a duration sufficient to support
wetland vegetation; or where the soils support the growth of wetland vegetation, but such vegetation is
dominated by woody stems that are six (6) meters (approximately twenty (20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over
and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Velocity zone - an area of special flood hazard extending from offshore to the inland limit of the
primary frontal dune along an open coast and any other area subject to high velocity wave action from
storms or seismic sources.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water crossing - any project extending from one bank to the opposite bank of a wetland whether
under, through, or over the wetland. Such projects include but may not be limited to roads, fords,
bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these
crossings. This definition includes crossings for timber harvesting equipment and related activities.
53
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Wetland - a freshwater wetland or coastal wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
54
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Appendix A
Description of shoreland boundaries
The following is a verbal description of the Official Shoreland Zoning Ordinance Map for the Town of Sorrento,
amended May 1993 and again in June 2021. Lots listed herein fall, all or in part, within 250 feet of mean
average high tide, or within 250 of a designated water body.
The following list of Shoreland Zones start at the northeast end of the Sorrento-Sullivan town line on Bass
Cove, proceeds south along the shore of Flanders Bay, and continues clockwise around Waukeag peninsula to
the Sorrento-Sullivan town line on Long Cove. Islands falling within the jurisdiction of the Town of Sorrento are
included in appropriate peninsular zones.
Map numbers and lot numbers are those appearing on the Official Tax Maps for the Town of Sorrento dated
1975, updated 1990 and 2004.
Zone 1 --- Limited Residential
Tax Map 11 -- Lots: 12, 12A, 20, 21, 24,26 and 29
Tax Map 13 -- Lots: 4, 5, 7, 8, 10A, 11, 13 and 14
Zone 2 --- General Development (1/2)
Tax Map 9 -- Lots: 16, 19, 22A, 22B and 22C
Tax Map 11 -- Lots: 2, 2A, 4, 5, 7, 8 and 10
Zone 3 --- Resource Protection
Tax Map 9 -- Lot: 11
This zone also includes Soward Island
Zone 3 --- Limited Residential with Resource Protection
within 75' from mean high tide
Tax Map 9 -- Lots: 6, 25 and 25A
Zone 4 --- Limited Residential
Tax Map 5 -- Lots: 7, 7A, 8 and 9
Tax Map 6 - Lots: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 and 14
Zone 5 --- Resource Protection
Tax Map 5 -- Lots: 10, 10A to east end of Powhatan Ave. where road turns south
Tax Map 6 -- Lots: 15 and 16
This zone also includes the island southeast of Ash Island which does not appear on the Official Tax Map
Zone 6 -- Limited Residential
Tax Map 1 -- Lot: 1
Tax Map 3 -- Lot:: 1
Tax Map 5 -- Lots: 10B, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 21A, 21B, 22, 23 and 23A
55
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Zone 7 --- Resource Protection
Tax Map 1 -- Lots: 2 and 3
Tax Map 2 -- Lots: 1 and 2
This zone also includes two unnumbered islands north of Preble Island
Zone 8 --- Commercial Fisheries / Maritime Activities
Tax Map 5 -- Lots: 25, 26, 26A, 27, 31, 32, 32A, 33, 34, 35, 36 and 36A
Tax Map 15 -- Lots: 37, 38, 39, 40, 40A, 41, 43, 44, 45, 46, 47, 48, 48A, 49, 50, 51, 52 and the Town Pier and ramp lot..
Zone 9 --- Limited Residential
Tax Map 4 -- Lot: 1
Tax Map 14 -- Lots: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 25, 26, 27, 31, 32, 33, 34, 39, 41, 44 and 45
Tax Map 15 -- Lots: 1, 2, 3, 3A, 4, 5, 6, 7, 8, 18, 19, 20 and 21
Zone 10 --- Commercial Fisheries / Maritime Activities
Tax Map 15 - Lots: 22, 23, 23A, 24, 25, 26, 27 and 27A
Zone 11 --- Limited Residential
Tax Map 5 -- Lots: 1, 2, 3, 4 and 37
Tax Map 9 -- Lots: 2, 7, 8, 8A, 10 and 10A
Tax Map 15 -- Lots: 28, 28A, 29, 30, 31, 32, 33, 34, 35 and 36
Zone 12 --- General Development 1 or 2
Tax Map 8 -- Lot: 1
Zone 13 --- Resource Protection
Tax Map 7 -- Lot: 2
This zone also includes small unnumbered islands, one southeast of Ingalls Island and one south-southwest of Welch
Island.
Zone 14 --- Limited Residential
Tax Map 7 -- Lot: 1
Tax Map 8 -- Lots: 2A, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 13A, 13B, 15, 16, 17, 18, 19, 19A, 20, 20A, 21, 24, 25, 26B, 26C,
26D and 27
Tax Map 10 - Lots: 1, 2, 3, 6, 6B, 7, 9 and 11
Tax Map 12 - Lots: 1, 3, 4, 5, 7, 10, 12-1, 12-2, 12-3, 12-4, 13, 14A, 16 and 17
Tax Map 13 - Lots: 1 and 8
56
Town of Sorrento Shoreland Zoning Ordinance (June, 2021)
Zone 15
Tax Map 9 - Lots: 10 and 21
Also in this zone are wetlands shown on Freshwater Wetlands Map ID8 which are described on the Official Shoreland
Zoning Map as follows:
Tax Map 8 - Lots 21 and 23A
Tax Map 10 - Lot 5
Tax Map 11 - Lots: 1 and 3