Southwest Harbor, Maine
· adopted 1990-05-08
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 91fbb4de518c · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
y, "GoTHWEss %
y s vacationin Es
SUBDIVISION ORDINANCE
OF THE TOWN OF SOUTHWEST HARBOR
Approved: May 8, 1990
Amended: through May 4, 2010
Amended: through November 3, 2020
Attested True Copy:
| ea arilyn Lowell
Table of Contents
SECTION I. AUTHORITY, ADMINISTRATION AND ADMINISTRATIVE
A. Authority 0. eee cee ccc cee eeeeeecee see eseuessuaseverssanerseesatsssaseeessestereeseeS
B. Administration 0.00.00... ccc ccc ccc ceeceecee cee ecececueeseseeeseeetseseetrestvaaetsteseeeeen3
C. Administrative Procedure ..............0..ccccccceccceecceeeecueeeeeceuesetereesseeteeessaneeeresD
D. Amendments to the Ordinance .............0. 000 ccc ccc eccecceeccuececceeseeeteeeesereesrece 5
A. The purposes of the Ordinance are: ......... 00. .0occ cece ccecceececeeceeeeececseeereeeeeses
B. Review Criteria of Title 30-A, M.R.S.A.
SECTION Ill. PREAPPLICATION WORKSHOP 0.0... .cecccececcceecceeeseeeee eee eeQ
A. Purpose ................9
B. PrOCedure o.oo. cece ccc ccc ee cee eee uee cee ceeuesseeeesseceeeaversnesateecessttesesesseessenY
C. SUBMISSION 0.2.0... cece cc ccc cee ceece cee cee ceeceeecuueeuterateatensteescrecsecseesceenY
D. On-Site Inspection and Contour Interval
E. Rights not Vested ... 00.0... cecceccecce ccc cecuecuseuecenseaseeseecererseersesserensd
SECTION IV. PRELIMINARY PLAN FOR
A. Procedure... ceccc eee cee cee cee ceases ees ceeuesuussuesuevensreeeeeressteesutteserseeee 40
B. SUBMISSION «20.0... cece ccc cee ccc cceeeeveccueseeeeaceeeeteseneeanecesateasteestesescsseeseee
SECTION V. FINAL PLAN FOR SUBDIVISION APPROVAL .................15
A, PrOCEMUIe 000... cece cee c cece cee ceeceececusseesensseveetevereutestssneteeetseseseeese4 5
B. SUDMISSION «00... eee ccc ccc cce eee eeeeesseseeseestaeeteteeetetereeesstteeeseeeee 16
C. Approval of the Application with the Final Plan .........000..00..ccccceceeeeeceeeeeeee ese 16
SECTION VI. REVISIONS TO APPROVED PLANS ......... 0.0... .....0 000002. 18
A. PFOCECUIC. oo. cece ccc eee ee eee eeeeesee ers cersetestecererististserettrttrersersseeedB
B. SUDMISSIONS «200.0... eee cece ences cee cen eee scesu sen seeteeeeevecessaesreesareer esses 4B
C. Scope Of REVIOW 2.0.2.0... cec cece ce cee cee ccceecsesceseesrecseveeverererestsereeeses AB
D. RECOMING 20.0... ccc cece cee ceeceeseeseaecuecetsssseveeesreereeresateresesee see 4B
E. Revisions to Approved Subdivisions. .............0..0...00ccccceseceueeceeeeeeseceeeee eee 18
SECTION VI]. ENFORCEMENT o....0..0. cc cccccccccccccecee cesses verses ees sers20
A. Inspection of Required Improvements ..........0. 000.0. ccc ccc eceeccece eee ececceeceeeeeseses20
B. Violations and Enforcement 0.20.00... 00. cc cece ccc ccccecccecucceuccecesveersccecseceressn2 1
SECTION VII. GENERAL STANDARDS ....0. 00.0... ccoo ccc cec cece cece cee cee eee 22
A. Required Improvements .........0.0.00 0c. ccceccecccececececrecececatesesecesucscurerecceseeses 22
B. Impact on Ground Water ........0..0..0 cc cccccccec ccc ces cee cee cee ccavenseetevsesateaevereesen 23
C. Land Features 2.000.000.0000. occ cece ec cccccecaeaeeceeesecesevaceeceeuseseeatusessreessseseressn dQ
D. Access Control and Traffic Impacts 2.0.00... 00. 00cccce ee eeceecececc ccc ceceteeeeesecereneeesne23
E. Retention of Open Spaces and Natural or Historic Features ..........00..0...00.000---25
F. Conformance with the Comprehensive Plan, Other Plans,
Codes and Ordinances 200.0... cec ccc ccecececececeeeceesscteeesesecsreessere 25
G. Construction in Flood Hazard Areas.......... 0... cc ccc ccecececccecucecevceescecesesececesessens 25
SECTION IX. ROAD AND STORM DRAINAGE DESIGN AND
CONSTRUCTION STANDARDS ...........................26
A. General Requirements ..........0...0..0cccccececceeceeceu see cceteceececuseaeserertteseeeteranee 26
B. Private Road (or Right-of-Way) Standards ..........000 0.0 .cccccceccceceeeceeseesaeeeeeeesee26
C. Storm Water Management Design Standards ...........0 00. ccccccccceee eee eccece cee sereeerne27
D. Additional Improvements and Requirements ........0.00......ccc eee eccueeceecuncee see eseeee-28
E. Certification of Construction .....0000..0 ccc ccc ccececccececceccceceecccecsssuevse tenses ceness 4.28
SECTION X. PERFORMANCE GUARANTEES ............0 0.0 ccc ccc cee cce cee cee e2Q
A. Types of Guarantees 20.00. ce ccc cec eee eee sce eee cesses tensrnsetareaneesaer sree 2
B. Contents of Guarantees 2.220.000. cic eee ccc ccccecce cee cenesctaeeseeneteescteceeeeeesni2Q
C. Escrow ACCOUNE ....... 0.0 ccc ccc cecccececacccccvevaeeceeserecetecasetereessttteeesesareeessren 2g
D. Performance Bond ..............0 0.0 ccc cc cece ccc cececececececeeseeeessaetevecstasesseressrseesaees 30
E. Letter of Credit 2.00.0... cee ccc ececacueeceseseseesenetetsseseresecaseereessersssse3O
F. Release of Guarantee ......0.0 0c ccc ccec ce cae cee cee cesses seecenctecstnseereesrere 30
G. Default 0.00... cce ccc cscs ee ccececessesesuveresenseetstatasetevavesstaecesetaresessse, 30
SECTION I. AUTHORITY, ADMINISTRATION AND ADMINISTRATIVE
PROCEDURES
A. Authority
1. This Ordinance shall be known and may be cited as "Subdivision Ordinance of the
Town of Southwest Harbor."
2. The standards in this Ordinance have been prepared in accordance with the
provisions of Title 30 - A MRSA, Sections 4401-4407.
B. Administration
3. The Planning Board of the Town of Southwest Harbor, hereinafter called the Board,
shall administer this Ordinance. No building or plumbing permit shall be issued
by the Planning Board or Code Enforcement Officer for any use or development
within the scope of this Ordinance until an application required by this Ordinance
has been reviewed and approved by the Board and any conditions attached to the
approval fulfilled.
4. The provisions of this Ordinance have been prepared in accordance with Title 30-A
MRSA Section 4401-4407 and shall pertain to all land and buildings within the
boundaries of the Town of Southwest Harbor proposed for subdivision.
a. Subdivision means the division of a tract or parcel of land into 3 or more
lots within any 5-year period that begins on or after September 23, 1971.
b. This definition applies whether the division is accomplished by sale, lease,
development, buildings, or otherwise.
c. The term "subdivision" also includes:
i) the division of a new structure or structures on a tract or parcel of land,
each into 3 or more dwelling units within a 5-year period.
i) the construction or placement of 3 or more dwelling units on a single
tract or parcel of land; and
ili) the division of an existing structure or structures previously used for
commercial or industrial use, each into 3 or more dwelling units
within a 5-year period.
In determining whether a tract or a parcel of land is divided into 3 or more
lots, the first dividing of the tract or parcel is considered to create the first 2
lots, and the next dividing of either of these first 2 lots, by whomever
accomplished, is considered to create a 3" lot. The first and second dividing
are deemed to occur simultaneously and to create three lots
when, as a result of the splitting off of a legal interest in a portion of the tract
or parcel, there are left remaining two non-contiguous portions of the tract or
parcel, whether or not any legal interest in those non-contiguous portions is
split off. However, no subdivision is created when:
iv) both such divisions are accomplished by a sub-divider who
has retained one of the lots for the sub-divider's own use
as a single family residence or for open space. As defined
in
Title 36, SECTION 1102, for a period of at least 5 years before
The 2" dividing occurs; or
v) the division of the tract or parcel is otherwise exempt under
this subchapter.
d. 'The dividing of a tract or parcel of land and the lot or lots so made, which
dividing or lots when made, are not subject to this subchapter, do not
become subject to this subchapter by the subsequent dividing of that tract or
parcel of land or any portion of that tract or parcel. The Town reviewing
authority shall consider the existence of the previously created lot or lots in
reviewing a proposed subdivision created by a subsequent dividing.
e. Alot of 40 or more acres shall not be counted as a lot, except when the lot or
parcel from which it was divided is located entirely or partially within any
shoreland areas as defined in Title 38, Section 435 (Mandatory Shoreland
Zoning effective January 1, 1989), or the Town's Land Use Ordinance.
f. A division accomplished by devise, condemnation, order of court, gift to a
person related to the donor by blood, marriage or adoption or a give to a
municipality or by the transfer of any interest in land to the owner of land
abutting that land does not create a lot or lots for the purposes of this
definition unless the intent of the transferor in any transfer or gift within this
paragraph is to avoid the objectives of this section. If the real estate
exempt under this paragraph by a gift to a person related to the donor by
blood, marriage or adoption is transferred within 5 years to another person
not related to the donor of the real estate by blood, marriage or adoption,
then that exempt division creates a lot or lots for the purposes of this
subsection.
g. _ The division of a tract or parcel of land into 3 or more lots and upon each of
which lot is permanent dwelling structures (either primary or seasonal) do
exist is not a subdivision if these permanent dwelling structures have
legally existed since before September 23, 1971.
h. In determining the number of dwelling units in a structure, the provisions of
this subsection regarding the determination of the number of lots apply,
including exemptions from the definition of a subdivision of land.
Notwithstanding the provisions of this subsection, leased dwelling units are
not subject to subdivision review if the Town reviewing authority determines
that the units are otherwise subject to municipal review at least as stringent
as that required under this subchapter.
C. Administrative Procedure
1. The Town shall conduct a multi-stage review procedure of one application:
* workshop
* preliminary plan with a completed application; and
¢ -- final plan
2. Applications for approval shall be submitted in writing to the Board, on forms
provided by it. For projects that are subject to the Maine Site Location of
Development Law, the Board will accept the application filed by the applicant for the
State Site Location permit, in lieu of the form provided by the Board. The Board may
require the submissions of whatever additional information is necessary todetermine
compliance with the provisions of this Ordinance.
3. Applications for approval under this ordinance must include evidence that all
appropriate local, State, and Federal Agencies have been requested to determine if
additional permits must be sought from them. Final approval will be given
conditionally upon receipt of these permits if they are required.
4. Applicants shall request to be placed on the Board's agenda at least two weeks in
advance of a regularly scheduled meeting by contacting the Town. Applicants who
attend a meeting but who are not on the Board's agenda may be heard but only after
all agenda items have been completed, and then only if a majority of the Board so
votes.
5. On all matters concerning subdivision review, the Board shall maintain apermanent
record of all its meetings, proceedings and correspondence.
6. Joint meetings between Town Planning Boards are required if any portion of a
subdivision crosses Town boundaries.
7. Any costs incurred by the Town in its effort to interpret information submitted for the
approval of a subdivision shall be borne by the applicant.
D. Amendments to the Ordinance
1. This Ordinance may be amended by the legislative body of the Town of Southwest
Harbor.
2. A public hearing shall be held prior to the adoption of any amendment. Notice of the
hearing shall be provided at least seven (7) days in advance of the hearing.
SECTION II. PURPOSES
A. The purposes of the Ordinance are:
1. to assure the comfort, convenience, safety, health and welfare of the people of the
Town of Southwest Harbor.
2. to protect the environment; and
3. to promote the development of an economically sound and stable community.
B. The Planning Board shall consider the following criteria and before granting approval shall
make findings of fact that the provisions of this Ordinance have been met and that the
proposed subdivision meets the following review criteria of Title 30-A, MRSA, Section 4404.
1. POLLUTION: will not result in undue water or air pollution; In making this
determination, the Board shall at least consider:
a. the elevation of the land above sea level and its relation to the flood plains;
b. the nature of soils and sub-soils and their ability to adequately support waste disposal:
C. the slope of the land and effect on effluents:
d. the availability of streams for disposal of effluents; and
e. the applicable health and water resources rules and regulations.
2. SUFFICIENT WATER: has sufficient water available for the reasonably foreseeable
needs of the subdivision;
3. MUNICIPAL WATER SUPPLY : The proposed subdivision will not cause an
unreasonable burden on an existing water supply, if one is to be used:
4. EROSION: will not cause unreasonable soil erosion or reduction in the capacity of
the land to hold water so that a dangerous or unhealthy condition may result;
5. TRAFFIC: will not cause unreasonable public road congestion or unsafe conditions
with respect to use of the public roads existing or proposed;
6. SEWAGE PROPOSAL: will provide for adequate sewage waste disposal and will
not cause an unreasonable burden on municipal services if they are utilized;
7. MUNICIPAL SOILD WASTE DISPOSAL: The proposed subdivision will not
cause an unreasonable burden on the municipality's ability to dispose of solid
waste, if municipal services are to be utilized;
8. AESTHETIC, CULTURAL AND NATURAL VALUES: will not have an undue
adverse effect on the scenic or natural beauty of the area, aesthetics, historicsites,
significant wildlife habitat identified by the Department of Inland Fisheries and Wildlife or
the municipality, or rare and irreplaceable natural areas or any public rights for physical or
visual access to the shoreline;
9. CONFORMITY WITH LOCAL ORDINANCES AND PLANS: The proposed
subdivision conforms with a duly adopted subdivision regulation or ordinance,
comprehensive plan, development pian or land use plan, if any. In making this
determination, the municipal reviewing authority may interpret these ordinances and
plans;
10. FINANCIAL AND TECHNICAL CAPACITY: The sub divider has adequate financial
and technical capacity to meet the standards of this section;
11.SURFACE WATERS: whenever situated entirely or partially within the watershed of
any pond or lake or within 250 feet of any wetland, great pond or river as defined in
Title 38, chapter 3, subchapter |, article 2-B, will not adversely affect the quality of that
body of water or unreasonably affect the shoreline of that body of water.
12. GROUND WATER: will not, alone or in conjunction with existing activities,
adversely affect the quality or quantity of ground water.
13. FLOOD AREAS: Based on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps, and information
presented by the applicant whether the subdivision is in a flood-prone area. If the
subdivision, or any part of it, is in such an area, the sub divider shall determine the
100-year flood elevation and flood hazard boundaries within the subdivision. The
proposed subdivision plan must include a condition of plan approval requiring that
principal structures in the subdivision will be constructed with their lowest floor,
including the basement, at least one foot above the 100-year flood elevation;
14. FRESHWATER WETLANDS: All freshwater wetlands within the proposed
subdivision have been identified on any maps submitted as part of the application,
regardless of the size of these wetlands. Any mapping of freshwater wetlands may
be done with the help of the local soil and water conservation district;
14-A. FARMLAND: All farmland within the proposed subdivision has been identified on
maps submitted as part of application. Any mapping of farmland may be done with
the help of the local soil and water conservation district;
15. RIVER, STREAM OR BROOK: Any river, stream or brook within or abutting the
proposed subdivision has been identified on any maps submitted as part of the
application. For purposes of this section, "river, stream or brook "has the same
meaning as in Title 38, section 480-B, subsection 9;
16. STORMWATER: The proposed subdivision will provide for adequate storm water.
management;
17. SPAGHETTI-LOTS PROHIBITED: If any lots in the proposed subdivision have
shore frontage on a river, stream, brook, great pond, or coastal wetland as these
features are defined in Title 38, section 480-B, none of the lots created within the
subdivision have a lot depth to shore frontage ratio greater than 5 to 1;
18. LAKE PHOSPHORUS CONCENTRATION: The long-term cumulative effects of
the proposed subdivision will not unreasonably increase a great pond's
phosphorus concentration during the construction phase and life of the proposed
subdivision;
19. IMPACT ON ADJOINING MUNICIPALITY: For any proposed subdivision that
crosses municipal boundaries, the proposed subdivision will not cause
unreasonable traffic congestion or unsafe conditions with respect to the use of
existing public ways in an adjoining municipality in which part of the subdivision is
located; and
20. Lands subject to liquidation harvesting. Timber on the parcel being subdivided
has not been harvested in violation of rules adopted pursuant to Title 12, section
8869, subsection 14. If a violation of rules adopted by the Maine Forest Service to
substantially eliminate liquidation harvesting has occurred, the municipal reviewing
authority must determine prior to granting approval for the subdivision that 5 years
have elapsed from the date the landowner under whose ownership the harvest
occurred acquired the parcel. A municipal reviewing authority may request technical
assistance from the Department of Agriculture, Conservation and Forestry, Bureau
of Forestry to determine whether a rule violation has occurred, or the municipal
reviewing authority may accept a determination certified by a forester licensed
pursuant to Title 32, chapter 76. If a municipal reviewing authority requests technical
assistance from the bureau, the bureau shall respond within 5 working days
regarding its ability to provide assistance. If the bureau agrees to provide
assistance, it shall make a finding and determination as to whether a rule violation
has occurred. The bureau shall provide a written copy of its finding and
determination to the municipal reviewing authority within 30 days of receipt of the
municipal reviewing authority's request. If the bureau notifies a municipal reviewing
authority that the bureau will not provide assistance, the municipal reviewing
authority may require a subdivision applicant to provide a determination certified by
a licensed Forester. For the purposes of this subsection, "liquidation harvesting" has
the same meaning as in Title 12, section 8868, subsection 6 and "parcel" means a
contiguous area within one municipality, township or plantation owned by one
person or a group of persons in common or joint ownership. This subsection takes
effect on the effective date of rules adopted pursuant to Title 12, section 8869,
subsection 14.
SECTION Ill. PREAPPLICATION WORKSHOP
A. Purpose
The purpose of the pre-application meeting and on-site inspection is for the applicant to
present general information regarding the proposed subdivision to the Board and receive
the Board's comments prior to the expenditure of substantial sums of money on surveying,
soils identification, and engineering by the applicant.
B. Procedure
a. The applicant shall present a sketch plan and make a verbal presentation regarding
the site and the proposed subdivision.
b. The date and time of the on-site inspection shall be scheduled.
C. Submission
The Pre-application Sketch Plan, which may be a free-hand penciled sketch, shall
show, in simple sketch form, the proposed layout of streets, lots, buildings and other
features in relation to existing conditions. The sketch plan should:
a. be supplemented with general information to describe or outline the
existing conditions of the site and the proposed development;
b. be superimposed on or accompanied by a copy of the Assessor's Map(s)
on which the land is located;
c. be accompanied by a copy of a portion of the USGS Southwest Harbor
Quadrangle, Bartlett Island Quadrangle, and Bass Harbor, Maine -- Hancock
Co. 7.5 Minute Series topographic map showing the outline of the proposed
Subdivision. (The majority of the USGS maps have a contour interval of 6
meters, approximately 20 feet).
d. The Board shall then determine and inform the applicant in writing if they require a
more precise contour interval than on the USGS maps for the formal application.
D. On-Site Inspection and Contour Interval
Within thirty (30) days of the Pre-application Meeting, the Board shall hold an on-site
inspection of the property. . The applicant shall place "flagging" at the centerline of any
proposed streets, and at the approximate intersections of the street centerline and lot
corners, prior to the on-site inspection. The Board shall not conduct on-site inspections
when there is snow on the ground.
E. Rights not Vested
The workshop of the pre-application sketch plan and the on-site inspection shall not cause
the plan to be a pending application under the protection of Title 1, MRSA, Section 302.
This will occur at the time of the acceptance of the completed application.
SECTION VI. PRELIMINARY PLAN FOR SUBDIVISION APPROVAL
A. Procedure
1. Within six months of a workshop, the sub-divider shall submit an application for approval
with a preliminary plan based upon the sketch plan, plus any recommendations made
by the Board.
2. APPLICATION FOR SUBDIVISION: All fees for Subdivision approval shall be accompanied by a
non-refundable fee as the same may be established from time to time by the Board of
Selectpersons, after notice and hearing. The fee shall reflect the reasonable cost of processing the
application (see Fee Schedule). The Planning Board reserves the right to obtain an
independent evaluation of a proposed development, to assist them in making necessary
findings of fact. If the Planning Board deems such a study necessary, it will request a
reasonable additional sum from the applicant to defray the cost of such study or studies.
Any funds not utilized for consultant studies will be returned to the developer.
3. Upon receiving the application, the Town shall issue a dated receipt to the applicant and
shall notify by mail all abutting property owners of the proposed subdivision, specifying the
location of the proposed subdivision and a general description of the project.
4. Within 30 days from the dated receipt, the Planning board shall hold a meeting to
determine if the application is complete. The Town shall notify the sub-divider in writing
either that the application is a complete application, or, if the application is incomplete, the
specific additional material needed to make a complete application.
5. After the Planning Board has determined that a complete application has been filed, it shall
have 30 days within which to call a public hearing. The Town shall notify the sub-divider of
the date, time and place of the public hearing, and cause this information to be published in
a newspaper of general circulation in the Town, at least two (2) times, the date of the first
publication to be at least 7 days prior to the hearing, and similarly notify the abutters to the
subdivision by mail.
6. The sub-divider, or his duly authorized representative, shall attend the meeting of the Board
to discuss the application.
7. The Board shall, within 30 days of a public hearing, or within another time limit as may be
otherwise mutually agreed to by the Board and the sub-divider, make findings of fact on the
application, and approve, approve with conditions, or deny the application based on the
preliminary plan. The Board shall specify in writing its findings of facts and reasons for any
conditions or denial.
8. When approval to a preliminary plan is granted, the Board must state the conditions of such
approval, if any with respect to:
a. the specific changes which it will require in the final plan;
b. the character and extent of the required improvements for which waivers may have
been requested and which in the Board's opinion may be waived without jeopardy
to the public health, safety, and general welfare; and
C. the construction items for which cost estimates and performance guarantees will be
required as prerequisite to the approval of the final plan.
9. Approval of a preliminary plan shall not constitute approval of the final plan or intent to
approve the final plan, but rather it shall be deemed an expression of approval of the design
of the preliminary plan as a guide to the preparation of the final plan. The final plan shall be
submitted for approval of the Board upon fulfillment of the requirements of these regulations
and the conditions of preliminary approval, if any. Prior to the approval of the final plan, the
board may require additional changes as a result of the further study of the sub-division or as
a result of new information received.
B. Submission
1. Location Map: The preliminary plan shall be accompanied by allocation map
adequate to show the relationship of the proposed subdivision to the adjacent
properties. This map shall show:
a. any existing subdivisions in the proximity of the proposed subdivision;
b. location and names of any existing and proposed streets;
C. any boundaries and designations of zoning districts; and
d. an outline of the proposed subdivision and any remaining portion of the
owner's property if the preliminary plan submitted covers only a portion of the
owner's entire contiguous holding.
2. Other Required Permits: The preliminary plan application shall contain an advisory
opinion from the appropriate Federal, State and Local agencies as to the application
of their rules to this subdivision application.
3. Preliminary Plan: The preliminary plan shall be submitted in two copies of one or
more maps or drawings which may be printed or reproduced on paper, with all
dimensions shown in feet or decimals of a foot. The preliminary plan shall be drawn
to scale of not more than 100' to the inch. The Board reserves the right to request
such scale as it deems appropriate to the application. In addition, eight copies of the
plan(s) reduced to a size of 8 % by 11 or 11 x 17 inches shall be submitted to the
Board.
The following information shall either be shown on the preliminary plan or
accompany the application for preliminary approval:
a. proposed name of the subdivision, or identifying title; the name of the Town;
and the Assessor's Map and Lot numbers;
b. verification of right, title, or interest in the property:
C. a standard boundary survey of the tract, giving complete descriptive data by
bearings and distances, made and certified by a registered land surveyor.
(The corners of the tract shall be located on the ground and marked by
monuments);
d. a copy of the most recently recorded deed for the parcel. A copy of all
covenants or deed restrictions, easements, rights-of way, or other
encumbrances currently affecting the property.
e. a copy of any covenants or deed restrictions intended to cover all or part of
the lots in the subdivision;
f. the date the plan was prepared, north arrow, graphic map scale, names and
addresses of the owner(s) of record, sub-divider, and individual or company
who prepared the plan, and names of adjoining property owners.
g. the number of acres within the proposed subdivision, location of property
lines, existing buildings, water courses, vegetative cover type, and other
essential existing physical features.
h. the proposed lot lines with approximate dimensions and lot areas;
i. the location, names and present widths of existing and proposed streets,
easements, parks and other open spaces on or adjacent to the subdivision;
j. the plan shall show lines or dots in the center of proposed roads every fifty
(50) feet, for E-911 purposes, to aid in the assignment of numbers to
structures subsequently constructed;
k, the width and location of any roads or public improvements shown uponthe
official map and the Comprehensive Plan, if any within the subdivision:
I. the parcels of land proposed to be dedicated to public use and the conditions
of such dedication;
m. the location of any open space to be preserved and a description of proposed
ownership, improvements and its management;
n. the names and addresses of the record owner, sub-divider, and individual or
company who prepared the plan and owners of record of adjacent property,
including any property directly across an existing public street from the
subdivision;
oO. the zone in which the proposed subdivision is located and the location of any
zoning boundaries affecting the subdivision, noting particularly any Shoreland
Zoning boundaries:
p. the boundaries of any flood hazard areas in the 100-year flood elevation
delineated on the plan if any portion of the subdivision is in the flood-hazard
area.
q. contour lines at the interval specified by the Board showing elevations in
relation to Mean Sea Level (NGVD) shall be required for subdivisions near
bodies of water.
r. indication of the type of sewage disposal to be used within the subdivision;
i) connection to the public sewer: a letter shall be submitted from the
Town indicating that there is adequate capacity within the Town's
system to transport and treat the sewage;
ii) subsurface wastewater disposal: test pit analysis, prepared by a
Licensed Site Evaluator, shall be provided for each proposed lot in the
subdivision. The analysis shall include: lot number, test pit number,
soil profile/condition (from Table 6-1 of the Plumbing Code), depth of
pit, depth to seasonal high groundwater table, depth to restrictive layer,
and depth to bedrock. A map showing the location of all test pits dug
on the site shall be submitted.
iii) centralized or shared subsurface sewage disposal system: prepared
by a licensed site evaluator for design flows less than 2000 gallons/day
and prepared by a professional engineer if the design flow is greater
than 2000 gallons/day. The Board may require that the applicant seek
approval from the Department of Human Services. A map showing the
location(s) of the system and legal documentation showing the
necessary easements or covenants shall be submitted.
S. indication of the type of water supply to be used within the subdivision:
i) public water supply: a letter shall be submitted from the Southwest
Harbor Water Department indicating that there is adequate supply and
pressure for the subdivision and approving the plans for extensions
where necessary.
ii) evidence of adequate ground water supply and quality may be
requested by the Board and this shall be submitted by a well driller of a
hydro-geologist familiar with the area (this may include the request for
a phosphate concentration impact analysis; if the proposed
subdivision is within the watershed of a lake, stream, or coastal
wetland, the phosphate concentration impact on the ground water must
be determined);
t. a copy of that portion of the State soil survey covering the subdivision
including a legend and the soil interpretation sheet for the soils involved.
(When the survey shows soils which are generally unsuitable for the uses
proposed, the Board may require the submittal of a highly intensity soils
survey by a registered soil scientist indicating the suitability of soil conditions
for those uses);
u. A storm water management plan shall be provided that is designed for
maximum lot coverage allowed in the zone or to some lesser lot coverage
percentage that the applicant stipulates will not be exceeded plus the
additional impervious areas created for roads..
V. the location and size of existing and proposed sewers, subsurface sewage
systems, water mains, wells, culverts, utilities, and drainage ways on or
adjacent to the property to be subdivided;
Ww. a determination must be made whenever a subdivision is situated, in whole or
in part, within 250' of any wetland, great pond or river, or within their
watershed, that the proposed subdivision will not adversely affect the quality
or unreasonably affect the shoreline of any body of water;
x. a map identifying all freshwater wetlands regardless of size, rivers, streams,
and /or brooks within or abutting the proposed subdivision (reference may be
made to the Southwest Harbor Wetlands and Soil Maps);
y. an estimate of the amount and type of vehicular traffic to be generated on a
daily basis and at peak hours; (for subdivisions involving 40 or more parking
spaces or projected to generate more than 400 vehicle trips per day, a traffic
impact analysis, prepared by a registered professional engineer with
experience in traffic engineering, shall be submitted. The analysis shall
indicate the expected average daily vehicular trips, peak hour volumes,
access conditions at the site, distribution of traffic, types of vehicles expected,
effect upon the level of service of the street giving access to the site and
neighboring streets which may be affected, and recommended improvements
to maintain the desired level of service on the affected streets. Trip
generation rates used shall be the mean value reported in Table 3 of
"Development and Application of Trip Generation Rates", Kellerco, Inc.,
published by the Federal Highway Administration, January 1989); and
z. a statement of adequate financial capacity demonstrating the financial ability
of the sub-divider to complete the project.
SECTION V. FINAL PLAN FOR SUBDIVISION APPROVAL
A. Procedure
a. Within six months after the approval of the completed application submitted with the
preliminary plan, the sub-divider shall file with the Town the application for approval
with the final plan of the project. This plan shall approximate the layout shown on
the preliminary plan plus any recommendations made by the Board.
b. An additional processing fee shall be required to cover the costs of
advertising and postal notification for the public hearing. (see fee
schedule)
c. Upon receiving the application with the final plan, the Town shall issue a dated
receipt to the applicant.
d. Within 30 days from the dated receipt, the Planning Board shall hold a meeting to
determine if the submission requirements for Final Plan have been met, and if not,
what specific information is still needed. The Town shall notify the sub-divider in
writing either that the application with the Final Plan as submitted has met the
requirements, or if not, the specific materials needed to do so.
e. Within 30 days after the issuance of the dated notice sent to the sub-divider by
certified mail, the Town shall notify the sub-divider of the date, time and place of the
public hearing and cause this information to be published twice in a newspaper of
general circulation in the Town, the date of the publication to be at least 7 days prior
to the hearing, and similarly notify the abutters to the subdivision by certified mail.
When a subdivision is located within 500 feet of a Town boundary, the Board shall
notify the Clerk and the Planning Board of the adjacent Town involved, at least ten
days prior to the hearing.
f. The Board shall notify the Road Foreman, School Officials, Police Chief, and Fire
Chief of the proposed subdivision, the number of dwelling units proposed, the length
of roadways, and the size and construction characteristics of any multi-family,
commercial or industrial buildings. The Board shall request that these officials
comment upon the adequacy of their department's existing capital facilities to
service the proposed subdivision.
g. Before the Board grants approval of the application with the final plan, the sub-
divider shall meet the performance guarantee requirements contained in Section X.
h. The Board, within 30 days from the public hearing, shall make findings of fact, and
conclusions relative to the standards contained in Title 30 - A, MRSA, Section
4404- 4407 (or as amended and in this Ordinance). If the Board finds that all
standards of the Statute and this Ordinance have been met, they shall approve the
application with the final plan. If the Board finds that any of the standards of the
Statute or this Ordinance have not been met, the Board shall either deny the
application or approve the application with conditions to ensure all of the standards
will be met by the subdivision. The reasons for any conditions shall be stated in the
records of the Board.
B. Submission
1. Location Map: As required under preliminary plan application.
2. Final Plan: As required under preliminary plan application. In addition:
i. Plans shall be no larger than 24 by 36 inches in size, and shall have a margin of
2 inches outside the border line on the left side for binding and a one inch
margin outside the border along the remaining sides.
ii. Space shall be reserved on the plan for endorsement by the Board.
ili. The plan must bear the seal of a professional land surveyor or other authorized
design professional. If the plan is prepared by or under the responsible charge of
a professional land surveyor, the plan shall include the signature as well as the
seas of that surveyor. Note: the Registry of Deeds is unable to accept a plan for
recording unless it is embossed with the seal or an architect, professional
engineer or registered land surveyor.
iv. Two reproducible, stable based transparent originals, one to be recorded at
the Registry of Deeds, the other to be filed at the Town Offices, and three
reproducible copies of the plan shall be submitted.
3. The application with the final plan submitted for approval shall include all of the
information required under preliminary plan approval plus any recommendations
made by the Board at that time and the following information:
a. The plan shall contain sufficient data to allow the location, bearing and length
of every street line, lot line and boundary line to be readily determined and be
reproduced upon the ground. These lines shall be tied to reference points
previously established. The length of all straight lines, the deflection angles
radii, length of curves and central angles of curves, tangent distances and
tangent bearings for each street shall be included.
b. A soil erosion and sedimentation control plan, prepared in accordance with
the performance standards contained in the Land Use Ordinance. The
Board may require that this plan be prepared by a qualified engineer.
C . Approval of the Application with the Final Plan
1. No plan shall be approved by the Board as long as the sub-divider is in violation
of the provisions on a previously approved plan.
2. Upon findings of fact and determination as stated in the above paragraph A.9. and
upon voting to approve the subdivision, the Board shall sign the final plans and
specify any conditions for approval in writing on the plan. The Board shall specify in
writing its findings of fact and reasons for any conditions of approval or denial. One
paper copy of the signed plan shall be retained by the Board as part of its permanent
records, one copy shall be forwarded to the Tax Assessor, and two shall be
forwarded to the applicant (one of these plus the transparent original to be recorded
by the applicant in the registry).
3. Any subdivision not recorded in the Registry of Deeds, within ninety days of the date
upon which the plan is approved and signed by the Board shall become null and
void.
4. The approval by the Board of a subdivision shall not be deemed to constitute or be
evidence of any acceptance by the municipality of any street, easement, or other
open space shown on such plan. When a park, playground or other recreation area
shall have been shown on the plan to be dedicated to the Town, approval of the plan
shall not constitute an acceptance by the Town of such areas. The Board shall
require the plan to contain appropriate notes to this effect. The Board may also
require the filing of a written agreement between the applicant and the Town
Officers covering future deed and title, dedication, and provision for the cost of
grading, development, equipment and maintenance of any such dedicated area.
5. Failure to commence substantial construction of the subdivision within 5 years of the
date of approval and signing of the final plan shall render the plan null and void.
Upon determining that a subdivision's approval has expired under this paragraph,
the Board shall have a notice placed in the Registry of Deeds to that effect.
SECTION VI. REVISIONS TO APPROVED PLANS
A. Procedure
An applicant for a revision to a previously approved plan shall, at least 14 days prior to a
scheduled meeting of the Board, request to be placed on the Board's agenda. The
procedures for preliminary plan approval shall be followed.
B. Submissions
The applicant shall submit a copy of the approval plan, as well as two copies of the
proposed revisions to the Town. Eight copies of the proposed revisions reduced to a size
of 8 % by 11 inches or 11 by 17 inches shall be submitted to the Board. The application
shall also include enough supporting information to allow the Board to make a
determination that the proposed revisions meet the provisions of this Ordinance.
C. Scope of Review
The Board's scope of review shall be limited to those portions of the plan which are
proposed to be changed. The Board's decision shall be accompanied by findings of fact
based on the review criteria.
D. Recording
A subdivision plan presented for recording to the Registry of Deeds which is a revision to
an existing plan shall cause the registry to:
1. indicate on the index for the original plan that it has been superseded by another
plan and reference the book and page on which the new plan is recorded: and
2. ensure that the book and page on which the original plan is recorded is referenced
on the new plan.
E. REVISIONS TO APPROVED SUBDIVISION APPLICATIONS AND PLANS
1. Procedure.
An applicant for a revision to a previously approved subdivision application shall, at least 14
days prior to a scheduled meeting of the Board, request to be placed on the Board's
agenda. The procedures for Preliminary Plan approval shall be followed.
2. Submission.
The applicant shall submit a copy of the approved plan, as well as two copies of the
proposed revisions to the Town. Eight copies of the proposed revisions reduced to a
size of 8-1/2"x11" or 11"x17" shall be submitted to the Board. The application shall
also include enough supporting information to allow the Board to make a determination
that the proposed revisions meet the standards of this Ordinance.
3. Scope of Review.
The Board's scope of review shall be limited to those portions of the plan which are
proposed to be changed. The Board's decision must be accompanied by findings of
fact based on the review criteria.
4. Recording.
A subdivision plan presented for recording to the Registry of Deeds which is a revision
or an amendment to an existing plan shall cause the Registry to:
a. indicate on the index for the original plan that it has been superseded by another plan
and reference the book and page on which the new plan is recorded;
b. ensure that the book and page on which the original plan is recorded is referenced
on the new plan.
SECTION Vil. ENFORCEMENT
A. Inspection of Required Improvements
1. If a variance is granted and considered a condition of the final subdivision approval it
must be recorded at the Registry of Deeds and attached to the deed within 90 days
of its granting.
2. Any person who develops a subdivision in a manner other than as depicted on the
final approved subdivision plan shall be subject to penalties and fines in accordance
with SECTION VII -- B of this Ordinance.
3. At least 5 days prior to commencing each major phase of construction of required
improvements (see SECTION VIII.A.), the sub-divider or builder shall notify the Code
Enforcement Officer (CEO) in writing of the time when he proposes to commence
construction of such improvements, so that all Town specifications and requirements
shall be met during the construction stages and to assure the satisfactory completion
of improvements and utilities required by the Board.
4. If the CEO finds upon inspection of the improvements that any of the required
improvements have not been constructed in accordance with the plans and
specifications filed by the sub-divider, he shall so report in writing to the Town and
the sub-divider shall obtain permission to modify the plans from the Board.
5. If at any time before or during the construction of the required improvements, it
appears to be necessary or desirable to modify them, revised plans shall be filed
with the Town and the sub-divider shall obtain permission to modify the plans from
the Board.
6. By December 1* of each year during which construction was done on the site, the
Town shall have the site inspected by the Code Enforcement officer. The CEO shall
submit a report to the Board based on that inspection, addressing whether storm
water and erosion control measures (Both temporary and permanent) are in place,
are properly installed, and appear adequate to do the job they were designed for.
The report shall also include a discussion and recommendations on any problems
which were encountered. If the Board so determines that the services of a
professional registered engineer are required to assess the stated problems, the
expense shall be borne by the sub-divider.
7. Upon completion of street construction and prior to a vote by the Town Officers to
submit a proposed Town way to a Town Meeting, a written certification signed by a
professional engineer registered in the State of Maine shall be submitted to the
Town Officers at the expense of the applicant, certifying that the proposed Townway
meets or exceeds the design and construction requirements of the Southwest
Harbor Road Ordinance. If there are any underground utilities, the servicing utility
shall certify in writing that they have been installed in a manner acceptable to the
utility.
8. Prior to the sale of any lot, the sub-divider shall install all monumentation for that lot
as shown on the plan.
B. Violations and Enforcement
1. No plan of a division of land within the Town which would constitute a subdivision
shall be recorded in the Registry of Deeds until a final plan has been approved by
the board in accordance with this Ordinance.
2. No person, firm, corporation or other legal entity may convey any land ina
subdivision which has not been approved by the Board and recorded in the Registry
of Deeds.
3. Any person, firm corporation or other legal entity who conveys any land in a
subdivision which has not been approved as required by these regulations shall be
punished by a fine of not less than $100, and not more than $2,500 for each such
conveyance, offering or agreement. The Town may institute proceedings to enjoin
the violation of this section, and may collect attorney's fees and court costs if it is the
prevailing party.
4. No utility company of any kind shall serve any lot in a subdivision for which a final
plan has not been approved by the Board.
5, Development of a subdivision without Board approval shall be a violation of thelaw.
Development includes grading or construction of roads, grading of land or logs, or
construction of buildings which required a final plan approved as provided in these
regulations and recorded in the Registry of Deeds.
SECTION Vill. GENERAL STANDARDS
In reviewing applications for a subdivision, the Board shall consider the following general
standards and make findings that each has been met prior to the approval of the final plan. In all
instances the burden of proof shall be upon the applicant and the Board reserves the right to
require additional information.
A. Required Improvements
The following improvements are required for all subdivisions unless waived by the Board in
accordance with provisions of these regulations.
1. Central Water Supply
if a central water supply system is provided by the sub-divider, the location and
protection of the source, and the design, construction and operation of the system
shall conform to the standards of the Maine Rules Relating to Drinking Water (10-
144 A.C.M.R. 231: Maine Department of Human Services, Water Division).
2. Surface Drainage
The storm water management plan submitted in accordance with Section [X.B. shall
be installed.
3. Subsurface Sewage Disposal
The developer shall submit evidence of soil suitability for subsurface sewage
disposal prepared by a Maine licensed site evaluator in full compliance with the
requirements of the state of Maine Subsurface Wastewater Disposal Rules. The test
log shall include: lot number, test pit number, soil profile/condition (from Table 6-1 of
the Plumbing Code), depth of pit, depth of seasonal high groundwater table, depth to
restrictive layer, and depth to bedrock. In addition, on lots in which the limiting factor
has been identified, a second site with suitable soils shall be shown as a reserve
area for future replacement of the disposal area. The reserve area shall be shown
on the plan and restricted so as not to be built upon.
4. Monuments
Permanent monuments shall be set at or within 50' of all lot corners and street
intersections on the interior or exterior boundaries of the subdivision. Additional
monuments shall be set such that no interior, exterior or highway boundary segment
exceeds 750' between monuments. The final plan shall indicate the location and
character of all monuments. Monuments shall be iron pins or pipes of not less than
"4" in diameter and may have "surveyor's caps", stone blocks with metal plates, or
Federal Government specification monuments.
B. Impact on Ground Water
1. A ground water assessment by a qualified professional shall contain at least the
following information:
a. amap showing the basic soils types;
b. projections of the subdivision's impact on ground water phosphate
concentrations for subdivisions within the watershed of a lake;
c. amap showing the location of any subsurface wastewater disposal systems
and drinking water wells within the subdivision and within 200 feet of the
subdivision.
C. _bLand Features
1. Topsoil shall be considered part of the subdivision and shall not be removed from
the site.
2. Except for normal thinning, landscaping and cutting trees to provide access to direct
sunlight, existing vegetation shall be left intact to prevent soil erosion and to
minimize storm water runoff.
3. To prevent soil erosion in shoreline areas, a buffer strip of vegetation shall be
preserved within a strip of land extending 75' inland from the normal high-water
line of a water body or upland edge of a wetland. The standards are specified
in the Southwest Harbor Lane Use Ordinance in SECTION VII.
PERFORMANCE STANDARDS, Paragraph B, page 30.
D. _Access Control and Traffic Impacts
1. General: Provisions shall be made for vehicular access to the subdivision and
circulation within the subdivision in such a manner as to safeguard against
hazards to traffic and pedestrians in existing roads and within the subdivision,
to avoid traffic congestion on any road and to provide safe and convenient
circulation on public roads and within the subdivision.
a. The vehicular access to the subdivision shall be arranged to avoid traffic use
of existing residential roads wherever possible.
b. Where a lot has frontage on two or more roads, the access to the lot shall be
provided across the frontage where there is lesser potential for traffic
congestion and for hazards to traffic and pedestrians.
c. The roads giving access to the subdivision and neighboring roads which can
be expected to carry traffic to and from the subdivision shall have
adequate traffic carrying capacity or be suitable improved by the sub-
divider to accommodate the amount and types of traffic generated by the
proposed subdivision.
2. Subdivision access design for subdivisions entering into arterial roads:
When the access to a subdivision is a road, the road design and construction
standards of Article IX shall be met. Where there is a conflict between the
standards in this section and the standards of Article IX, the stricter or more stringent
shall apply.
a. General: Access design shall be based on the estimated volume using the
access Classification defined below.
Low volume access: <25 vehicles/day
Medium volume access: between low and high
High volume access: >400 vehicles/hour at peak volume
b. Sight distances: Accesses shall be designed in profile and grading and
located to provide the required sight distance measured in each
direction. The required sight distances are listed below for various
posted speed limits.
(Sight distances shall be measured from the driver's seat of a vehicle
standing on that portion of the exit with the front of the vehicle a minimum of
10 feet behind the curb line or edge of shoulder, with the height of the eye 3
% feet, to the top of an object 4 % feet above the pavement).
i) Two land roads: 10' for each mile/hour of posted speed limit shall be
maintained or provided;
ii) Vertical alignment: accesses shall be flat enough to prevent the
dragging of any vehicle undercarriage. Low volume accesses shall
slope upward or downward from the gutter line on a straight line of
2% or less for at least 25 feet followed by a slope of no greater
than 10% for the next 50'. The maximum grade at any point over
the entire length shall not exceed 10: Medium and high volume
accesses should slope upward or downward from the gutter line
on a straight slope of 2% or less for at least 25'. Following this
landing area, the steepest grade on the access shall not exceed
8%.
3. Construction materials/paving:
a. All accesses entering a curbed road shall be curbed with materials matching
the road curbing. Sloped curbing is required around all raised
channelization islands or medians.
b. All accesses shall be paved with bituminous concrete pavement within the
road right-of-way. All commercial accesses regardless of access volume
shall be paved with bituminous concrete pavement within 30 feet of the
road right-of-way,
E. Retention of Open Spaces and Natural or Historic Features
1. The Board may require the reservation of up to ten percent of the area of the
subdivision as open space in order to provide for the recreational needs of the
occupants of the subdivision or to maintain the scenic or natural beauty of the
area. In determining the need for open space the board shall consider the
proximity of the subdivision to neighboring open space or recreation facilities;
the needs identified in the Town Comprehensive Plan for open space or
recreation facilities in the areas surrounding the subdivision; the type of
development and the demographic characteristics of potential residents in the
subdivision; and the density or lot sizes of the development.
2. The Board may require that the development plans include a landscape plan that will
show the replacement of trees and vegetation, graded contours, streams and the
preservation of scenic historic or environmentally significant areas.
3. If the proposed subdivision contains any identified historical or archeological sites, or
any area s identified in the Comprehensive Plan or by the Maine Critical Areas
Program as rare and irreplaceable natural areas, these areas shall be suitably
protected by appropriate covenants and management plans.
4. Any public rights of access to the shoreline, of a water body shall be maintained by
means of easements or right-of-way, or should be included in the open space,
with provisions made for continued public access.
F. Conformance with the Comprehensive Plan, Other Plans, Codes and Ordinances
All proposed subdivisions shall be in conformity with the Comprehensive Plan or policy
statement of the Town, and with the provisions of all pertinent state and local codes and
ordinances.
G.Construction in Flood Hazard Areas
When any part of a subdivision is located in special flood hazard area as identified by the
Federal Emergency Management Agency (FEMA), the plan shall indicate that all principal
structures on lots in the subdivision shall be constructed with their lowest floor, including
the basement, at least one foot above the 100-year flood elevation. Such a restriction shall
be included in the deed to any lot which is included or partially included in the flood hazard
area. A permit must be obtained under the Southwest Harbor Flood Hazard Ordinance
before any construction on these areas can begin.
SECTION IX. ROAD AND STORM DRAINAGE DESIGN AND CONSTRUCTION
STANDARDS
A. General Requirements
1. The Board shall not approve any subdivision plan which has a road or roads which
are intended for Town acceptance unless the proposed roads and the storm water
management systems are designed in accordance with the Road Ordinance of the
Town of Southwest Harbor. Approval of the final plan by the Board shall not be
deemed to constitute or be evidence of acceptance by the Town of any road or
easement.
2. The sub-divider shall submit to the Board, as part of the final plan, detailed
construction drawings as specified in the Road Ordinance for roads which are
proposed to be accepted by the Town. They shall submit construction information
for roads in the subdivision which are to remain private roads based on the
standards in Section IX.B.
3. Where the sub-divider proposes improvements with existing Town Ways, the
proposed design and construction details shall be approved in writing by the Town's
Road Foreman or the Maine Department of Transportation, as appropriate.
4. Upon receipt of plans for a proposed Town Way, the Board shall forward one copy to
the Town Officer and one to the Town Road Foreman for review and comments.
Plans for roads which are not proposed to be accepted by the Town shall be sent to
the Town Planner for review and comment.
5. Where the subdivision roads are to remain private roads, the following words shall
appear on the recorded plan.
"All roads in this subdivision shall remain private roads to be maintained by the developer, or the lot
owners and shall not be accepted or maintained by the Town."
B. Private Road (or Right-of-Way) Standards
(see Land Use Ordinance for Road Standards)
1. Design Standards:
Description Requirements
Minimum right-of-way 12' 24' or 30
Minimum vehicular way 9' for the 12' & 24' ROW
20' for the 30' ROW
Minimum grade 0.5%
Maximum grade 10%
Minimum tangent between curves of
reverse alignment 100'
Minimum angle of street intersection 60°
Maximum grade at intersection (within ;
50' of intersection) 3%
Minimum sight distance 150'
*A 24 minimum vehicular way is required if more than 15% of the total traffic generated by any commercial
and/or industrial use are vehicles or combination of vehicles of gross weight of more than 12,000 pounds.
The way must meet the Road Construction specifications in B.S.
2. Construction Standards:
Road Materials Minimum Requirements
Aggregate Sub-base 12'
Crushed aggregate base course 3"
C. Storm Water Management Design Standards
1. Adequate provisions shall be made for disposal of all storm water generated within
the subdivision and any drained ground water through a management system of
swales, culverts, under drains and storm drains. The storm water management
system shall be designed to conduct storm water flows to existing watercourses or
storm drains.
a. Where a subdivision is traversed by a stream, river or surface water drainage
way, or where the Board feels that surface water runoff to be created by the
subdivision should be controlled, there shall be provided easements or
drainage rights-of-way with swales, culverts, catch basins or other means of
channeling surface water within the subdivision and over the other properties.
The Board may request that the storm water management systems be
designed by a registered professional engineer.
b. Drainage easements of the storm water management systems shall be
designed according to the Road Ordinance, section IX and X. When the
subdivision discharges directly to the sea, peak discharge may be increased
from predevelopment levels provided downstream drainage structures are
suitably sized.
Cc. All components of the storm water management systems shall be designed
according to the Road Ordinance, Sections IX and X. When the subdivision
discharges directly to the sea, peak discharge may be increased from
predevelopment levels provided downstream drainage structures are suitably
sized.
2. Outlets shall be stabilized against soil erosion by stone riprap or other suitable
materials to reduce storm water velocity. Whenever the storm drainage system is
not within the right-of-way of a public way, perpetual easements shall be provided to
the Town allowing maintenance and improvement of the system.
3. The storm drainage shall not overload existing storm drainage systems downstream
from the subdivision. The sub-divider shall be responsible for financing any
improvements to existing drainage systems required to handle the increased storm
flow.
D. Additional Improvements and Requirements
1. Erosion Control. The procedures outlined in the erosion and sedimentation control
plan shall be implemented during the site preparation, construction and cleanup
stages.
2. Cleanup. Following road construction, the developer or contractor shall conduct a
thorough cleanup of stumps and other debris from the entire street right-of-way. If
onsite disposal of the stumps and debris is proposed, the site shall be indicated on
the Plan, and be suitably covered with fill and topsoil, limed, fertilized andseeded.
E. Certification of Construction
"As Built" plans shall be submitted to the Town Officers. Upon completion of road
construction and prior to a vote by the Town Officers to submit a proposed public way to
the legislative body, a written certification signed by a professional engineer registered in
the State of Maine shall be submitted to the Town Officers at the expense of the applicant,
certifying that the proposed way meets or exceeds the design and construction
requirements of the Road Ordinance and these regulations.
SECTION X. PERFORMANCE GUARANTEES
A. Types of Guarantees
With submittal of the application for final plan approval, the sub-divider shall provide one of
the following performance guarantees for an amount required to cover the total construction
costs of all covered improvements, taking into account the time span of the construction
schedule.
1. either a certified check payable to the Town or a savings account or certificate of
deposit naming the Town as owner, for the establishment of an escrow account;
2. a performance bond payable to the Town issued by a surety company, approved by
the Board of Selectmen and the Town Manager, or;
3. an irrevocable letter of credit from a financial institution, establishing funding for the
construction of the subdivision, from which the Town may draw if construction is
inadequate. This credit must be approved by the Board of Selectmen and the Town
Manager.
The conditions and amount of the performance guarantee shall be determined by the board
with the advice of the Town Officers and/or Town Attorney.
B. Contents of Guarantees
The performance guarantee shall contain a construction schedule, cost estimates for each
major phase of construction taking into account inflation, provisions for inspection of each
phase of construction, provisions for the release of part or all of the performance guarantee
to the developer, and a date after which the developer will be in default and the Town shall
have access to the funds to finish construction.
C. Escrow Account
A cash contribution to the establishment of an escrow account shall be made by either a
certified check made out to the Town, the direct deposit into a savings account, or the
purchase of a certificate of deposit. For any account opened by the sub-divider, the Town
shall be named as owner, and the consent of the Town shall be required for a withdrawal.
Any interest earned on the escrow account shall be returned to the sub-divider unless the
Town has found it necessary to draw on the account, in which case the interest earned
shall be proportionately divided between the amount returned to the sub-divider and the
amount withdrawn to complete the required improvements.
D. Performance Bond
A performance bond shall detail the conditions of the bond, the method for release of the
bond, or portions of the bond to the sub-divider, and the procedures for collection by the
Town. The bond documents shall specifically reference the subdivision for which approval
is sought.
E. Letter of Credit
An irrevocable letter of credit from a bank or other lending institution shall indicate that
funds have been set aside for the construction of the subdivision and may not be used for
any other project or loan.
F. Release of Guarantee
Prior to the release of any part of the performance guarantee, the Board shall determine to
its satisfaction, in part upon the report of the Code Enforcement Officer and whatever other
agencies and departments may be involved, that the proposed improvements meet or
exceed the design and construction requirements for that portion of the improvements for
which the release is requested.
G. Default
If, upon inspection, the Code Enforcement officer finds that any of the required
improvements have not been constructed in accordance with the plans and specifications
filed as part of the application, he shall so report in writing to the Board and the sub-divider
or builder. The Town Officers shall take any steps necessary to preserve the Town's rights.
SECTION XI. WAIVERS
A. Where the Board makes written findings of fact that there are special circumstances of a
particular side proposed to be subdivided, it may waive portions of the submission
requirements, the standards, the requirements or the performance guarantees unless
otherwise indicated in the regulations, to permit a more practical and economical
development, provided the public health, safety and welfare are protected, and provided
the waivers do not have the effect of nullifying the intent and purpose of the LUO, the
Comprehensive Plan, or the provisions of this Ordinance and provided the criteria of the
State Subdivision Law are met.
B. In granting waivers to any of these regulations in accordance with the above, the Board
shall require such conditions as will assure the objectives of these regulations are met.
C. When the Board grants a waiver to any of the standards of these regulations, the final plan
shall indicate the waivers granted and the date on which they were granted.
SECTION XII. APPEALS
An aggrieved party may appeal any decision of the Board under these regulations of the
Board of Appeals within 30 days.
SECTION XIll. DEFINITIONS
In general, words and terms used in this Ordinance shall have their customary dictionary
meanings. More specifically, any word or term defined in the Southwest Harbor Land Use
Ordinance shall have the definition contained in that Ordinance, unless defined differently below:
other words and terms used herein are defined as follows:
Complete Application -- An application shall be considered complete upon submission of the
required fee and all information required by these regulations for a preliminary plan. The Board
shall issue a receipt to the applicant upon its determination that an application is complete.
Comprehensive Plan -- Any pert or element of the overall plan or policy for development of the
Town as defined in Title 30- A MRSA Section 4502.
Contiguous Lots -- Lots which adjoin at any line or point, or are separated at any point by a body
of water less than 15' wide.
Covered Improvements -- Public improvements (roads, sidewalks, sewer, water), storm water
control and erosion control.
Densely-Developed Area -- Any commercial, industrial or compact residential area of 10 or more
acres with an existing density of at least one principal structure per 2 acres.
Driveway -- A vehicular way within a lot.
Dwelling Unit -- Any part of a structure which, through sale or lease, is intended for human
habitation. For example: a dwelling unit includes a single-family dwelling, each unit of a multi-
family dwelling, a condominium unit, and a time-share unit.
Final Plan -- The final drawings on which the applicant's plan of subdivision is presented to the
Board for approval and which, if approved, may be recorded at the Registry of Deeds.
Freshwater Wetlands -- Freshwater swamps, marshes, bogs and similar areas which are
inundated or saturated by surface or ground water at a frequency and for a duration sufficient to
support, and which under normal circumstances to support, a prevalence of wetland vegetation
typically adapted for life in saturated soil. They are not considered part of a great pond, coastal
wetland, river, stream or brook.
High Intensity Soil Survey -- a map prepared by a certified soil scientist, identifying the soil types
down to 1/8 acre or less at a scale equivalent to the subdivision plan submitted. The soils shall be
identified in accordance with the National Cooperative Soil Survey. The map shall show the
location of all test pits used to point identifying the following textural classification and the depth to
seasonal high water table or bedrock at that point. Single soil test pits and their evaluation for
suitability for subsurface wastewater disposal systems shall not be considered to constitute high
intensity soil surveys.
New Structure -- Includes any structure for which construction began on or after September 23,
1088. The area included in the expansion of an existing structure is deemed to be a new structure
for the purpose of this subchapter.
NGVD -- National Geodetic Vertical Datum
Official Submittal Date -- The date upon which the Board issues a receipt indicating a complete
application has been submitted.
Person -- Includes a firm, association, organization, partnership, trust, company or corporation, as
well as an individual.
Preliminary Subdivision Plan -- The preliminary drawings indicating the proposed layout of the
subdivision to be submitted to the Board for its consideration.
Principal Structure -- Any structure in which the main use of the premises occurs.
Recording Plan -- An original of the Final Plan, suitable for recording at the Registry of Deeds
and which need show on it information relevant to the transfer of an interest in the property, and
which does not show other information presented on the plan such as sewer and water line
locations and sizes, culverts and building lines.
Re-subdivision -- Any division of an existing subdivision or any change in the plan for an
approved subdivision which effects the lot lines, including land transactions by the sub-divider not
indicated on the approved plan.
Right-of-Way -- A legal right of passage over another person's ground or the area over which a
right-of-way exists.
Road -- A vehicular way giving access to one or more lots.
Streams, Brooks -- A channel between banks including the floodway and associated flood plain
wetlands where the channel is created by the action of the surface water and characterized by the
lack of upland vegetation or presence of aquatic vegetation and by the presence of a bed devoid
of top soil containing water-borne deposits on exposed soil, parent material or bedrock.
Structure -- (see SWH LUO and New Structure defined above)
Substantial -- Expansion by more than 30% measured as a percentage of estimated total cost.
Tract, or Parcel of Land -- All contiguous land in the same ownership, provided that lands located
on opposite sides of a public or private road are considered each a separate tract or parcel of land
unless the road was established by the owner of land on both sides of the road.