Stockton Springs, Maine
· adopted 2009-03-25
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 783bfca10a67 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
af
Town of | '
. Stockton Springs
Maine
P.O, Box 339
Stockton, Springs, ME 04981
Of the Town of Stockton Springs
aeestes Dyihice TY Maza als
Date: Liprc 72 200 1
Enacted March 25, 2009 1
This page left intentionally blank.
Enacted March 25, 2009 2
Table of Contents
Section 1 Tithe....ccccccccscssecccsscessecsserenseeeeeceeaeeeecensaessenssscceueatseeeaeensenseeeeseneanee D
Section 2 PUPPOSE v.cscsscccnsccccceeecccseseccceeeenseaaessseeceeesuseesseeeeeeeensnaeeersenseeeteeses O
ARTICLE II - AUTHORITY, APPLICABILITY & ADMINISTRATION.,......ccecsereenersseneneee
Section 1 AUthOrity......ccccescccnseccecesesecceeeeesenesseseeceneesseeeesseseseseanaenrrenseenereesees
Section 2 Administration ......cccccccseccssesccceauesereeeesseseneneunsceenssenereeneenseersessentnees O
Section 3 Effective Date ...c.ccccscsssecesssseereceseeeeeesssaeeeeseeaeersneneeeeesessaassseeseeesense O
Section 4 Applicability ......cccccsesscsssssssceeseeesssciseeeeseseseseeetesererssssaserenseteseres O
ARTICLE IV -- APPLICATION. cscecesecsessscsesscsscscsscscenssucseevescsesecsecseereanensaneaesenessse 7
Section 1 Existing Operations .......ccccccceessesceseeeeeesseseeeeeeeeereeeererssetesnrereetseseres 7
Section 2 Expansion of existing Operations... 8
Section 3 New Operations .....ccccceceeesseeeeeeseecesvecneeesecseeeeeeneseeeeeeeessarennecesensesase
Section 4 Wavier of SUDMISSION ....ccccceecesseeeeeeeeseeeereetenseeeetsanserssersaeessseessenes LO
Section 5 Application Procedures ......:csccssersesseetsrescseeseseaeeessessssanaseersenenes LO
ARTICLE V - PERFORMANCE STANDARDS .....tesscccteestsecteresessrseeeresseseseentereerenees bd
Section 1 General REQUIFEMENES .....ceeeeleceteeeeeeeeeeeteeeeeeeseereeeeseeeerreeereeeevecses LZ
Section 2 Performance Standards .....cccsccsseccssseeeeestseeseecessansccrsessessssersensneeene LD
ARTICLE VI - PERFORMANCE GUARANTEES ...cccsecsseseeesseeesorseeenrenesensasersersanense LZ
Section 1 Types and Contents Of Guarantee ....c.cceeccrseeeeeeseceneeeeeeeeeeeaneneenenes 17 |
_ Section 2 Release Of GUArANTCRS ....eeecccceedeseeeeecseeeersesensceeesssesesensateteeeesesete LZ
Section 1 FCCS .ccssccsecsceccceccecensuceesuseccuseeesasesesssesressseesecurerenseessesesennsesceeeae LZ
Section 2 Amendment after ADpProval.....ccccccccssecsssesccreersssstserseseerterssesseres LE
Section 3 Enforcement ....cccsccccsssssvssccesecseeseeseeesseessnensetasetessserstseeessesenres LO
Section 4 Right of Entry onto the Land ..vcscseccessereeeeeesestnereterstesseeeeeseees 1B
Section 5 Penalties ....ccccccccscsescceeescseececcrseeesscsesenteessecserrercssseesseressnsersessneeree LO .
Section 6 Appeals and VarianCes ...cccesecseenseeeesenseneussensuenerensenseesenenesenecenensnans 18
ARTICLE VIII - SEVERABILITY AND CONFLICT.....:0.ccceccsssnsseeesssereeeeneeraennaerrerens £9
Section 1 Severablility .......cccccccsesecccnvestceteeesensaeereccnseeseceurcrneneneenseneensenssegenee 19
Enacted March 25, 2009 3
Section 2 Conflict with other Ordinances ........ccssccsreserecseeseuceeereaeceeetereeeeenease LO
ARTICLE IX - AMENDMENT OF THIS ORDINANCE.,...ccssessccceteteesersesecevenseeereasees LO
Section 1 Initiation Of AMENGMENE .......ccsscccsecesececusectsecertececerteenceeanerseeseseeses LO
Section 2 Process Of ACOPtion .....sccscsssccsscasecesccueccnsscsseeseseneceeerecssecsssectseeeess LQ
Section 1 Public Access to Information .cc.ccsccsscesscsscssssecssesssestecsssssseesessetserets 20
Section 2 Adjoining Mineral Extraction Activity Under Common Scheme
DeVElOPMENK .....ccseccseeesceeesseceecsnceseeneeesnseessececseaseceeesarsetsereeusssnesseeetsesseseaees 20
Enacted March 25, 2009 | 4 :
MINERAL EXTRACTION ORDINANCE
Section 1 Title
This Ordinance shali be known and may be cited as the Mineral Extraction
Ordinance of the Town of Stockton Springs, Maine and will be referred to herein as
"this Ordinance".
Section Z Purpose
The purpose of this Ordinance is to establish minimum removal and reclamation
standards, and municipal procedures intended to regulate the removal, processing .
and storage of topsoil, loam, rock, flat rock, sand, gravel, or other similar
materials, other than metallic materials. These standards and procedures are
intended to protect the public health, safety, and general welfare; and to minimize
the adverse impact of extraction to the town, abutting owners, citizens of the town,
and wildlife and natural resources by:
A. Preserving and protecting surface and groundwater quality and quantity;
B. Preserving the value of property;
C. Assuring that mineral exploration and extraction activities are compatible with
permitted uses in that particular zone;
D. Assuring protection of wildlife and wildlife habitat; and
E. Protecting the scenic quality of Stockton Springs, its environment and its
residents. ,
ARTICLE Il - AUTHORITY, APPLICABILITY & ADMINISTRATION
Section 1 Authority
This ordinance is adopted pursuant and consistent with Title 30-A MRSA, Sections
3001 and 3015 and may be known and cited as the "Mineral Extraction Ordinance"
of Stockton Springs.
Section 2 Administration
The provisions of this Ordinance shail be administered by the Town of Stockton
Springs's Planning Board and enforced by the Town of Stockton Springs's CEO and
Select Board, who will establish, after notice and hearing, and, from time to time,
revise a fee schedule for the various applications and permits required by this
Ordinance.
Enacted March 25, 2009 5
Section 3 Effective Date
This Ordinance shall be effective immediately after its adoption by vote of eligible
voters of the Town of Stockton Springs, Maine at a town meeting.
Section 4 Applicability
A. The provisions of this Ordinance shall apply to all mineral operations (MEQOs),
except metallic minerals, within the Town of Stockton Springs, Maine, as
described in Article 1, and as listed below, unless exempted in Article III.
1. Existing operations.
2. Expansion of existing operations.
3. New operations
B. This ordinance does not apply to "inactive" mineral extraction operations
defined as (1) mineral extraction that has ceased for twelve (12) consecutive
months prior to the adoption of this Ordinance, and (2) a mineral extraction
operation that was not registered pursuant to Article IV. I. A. within twelve
(12) months after the adoption of this Ordinance. No inactive mineral
extraction operation shall be resumed until the owner or operator obtains a
new permit, pursuant to Article IV. 3. for the entire affected area, except
those portions previously reclaimed.
C. Mineral extraction operations (MEOs) less than one acre are allowed as a
permitted use with Planning Board approval in the following zones: Rural
Zone.
MEOs over one (1) acre or that include processing are allowed as a permitted .
use with Planning Board approval in the Rural Zone and Aquifer Protection
Overlay.
MEOs are prohibited in the following zones: Residential Zone, Recreational
Zone or Mixed Use.
ARTICLE III - EXEMPTIONS
This Ordinance shall not apply to the following:
A. Mineral exploration whose sole purpose is the determination of the nature
and/or extent of mineral resources, accompanied by hand-sampling, test
boring, or-other methods-which- create minimal disturbance. Test holes shall
be filled in immediately after use: .
B. MEOs that affect less than five thousand (5000) square feet of surface area,
or the removal or handling of less than two hundred (200) cubic yards of
material in less than twelve (12) months;
Enacted March 25, 2009 6
C. Storage or Stockpiles of winter abrasives (sand) used for the maintenance of
private or public roads. This applies to the stockpile or storage area itself
and not any associated mineral extraction activity or area;
D. Removal or filling of material incidental to construction, alteration or repair of
a structure, or in the landscaping incidental thereto:
E. Construction of farm and fire ponds, and water management berms; and
. F. Inactive areas where previous mining had tast occurred at least 12 months:-
prior to the adoption of this Ordinance.
ARTICLE IV - APPLICATION
Section 1 Existing Operations
A. Within one hundred and eighty (180) days of the approval of this Ordinance,
all MEOs existing as of that date, shall be registered with the Planning
Board, and submit the following:
1. Registration fee as listed in the Town of Stockton Springs Fee Schedule
2. Names and addresses of the current owner of the MEO and the operator,
and a copy of the deed or lease, if the operator is not the property owner.
3. Evidence that the MEO qualifies as an existing operation, a location map
and site plan drawn to scale showing property boundaries, stockpile
areas, existing reclaimed and un-reciaimed lands, proposed maximum
acreage of all affected lands, all applicable private drinking water supplies
or public drinking water sources and all existing or proposed solid waste
disposal areas; a description of the parcel including size and deed ,
description, a copy of the lease or other document showing that an
operator who is not the owner has a legal right to excavate on the
property. The names and addresses of abutting property owners, a
statement signed and dated by the owner or operator certifying that the
MEO will be operated in compliance with this ordinance. .
If a Notice of Intent to Comply has been filed or will be filed within 120
days of the effective date of this ordinance, and approved by the State of
Maine Department of Environmental Protection a copy of said document
shall be sufficient to comply with the requirements listed above.
A site location of development permit approved by the Board of
Environmental Protection shall also suffice for the requirements listed
above.
B. Any operation not registered, or which fails to qualify to be registered,
pursuant to this section, shall be deemed closed, and may not operate, after
such 180 day period. If operations continue or resume after such 180 day
Enacted March 25, 2009 7
period the owner or operator shall be subject to the civil penalties allowed in
30-A M.R.S.A., Section 4452 assessed for each day after the 180-day period.
Section 2 Expansion of existing Operations
A. Requirements .
No MEO existing at the time of passage of this Ordinance may expand
beyond existing state permitted boundaries without first obtaining an
Expansion of Existing Mining Permit from the Planning Board. For operations
less than five (5) acres in active excavation area as of the effective date of
this ordinance, expansion is defined as before an excavation exceeds 5 acres
in reclaimed and un-reclaimed land. For operations larger than five (5)
acres, expansion is defined as before an excavation exceeds 10 acres in
reclaimed and un-reclaimed land. Before expanding an MEO beyond an area
that exceeds a total of 10 acres of reclaimed and un-reclaimed land and
before each additional 10-acre expansion, the owner or operator shall notify
the planning board of the owner's or operator's intent to expand and must
request an inspection. The inspection shall be carried out by the town of
Stockton Code Enforcement Officer within 30 days of the request and a
report shall be presented to the planning board within 15 days of the
inspection. The operator may continue excavation activities after 45 days
unless the CEO has issued a stop work order. The failure of the CEO to
conduct a site inspection within 30 days is not a sufficient basis for a stop-
work order.
B. The applicant shall submit the following to the Planning Board;
1. Application fee as listed in the Town of Stockton Springs Fee Schedule.
2. Names and addresses of the current owner of the MEO and the operator,
and a copy of the deed or lease, if the operator is not the property owner.
3. Asite plan, prepared by a licensed surveyor, showing the following:
i. Date plan prepared, scale of drawings, with north arrow (indicate true
or magnetic).
ii, Boundaries of land showing lot lines, total acreage, existing and
proposed excavation areas, structures on property, anticipated depth
and height of final excavation, areas to be used for storage of topsoil
and other overburden, location of proposed hazardous material
storage areas, location of public and private streets, parking areas,
roadways and rights of way, location of proposed access roads,
exposed ground water on site, all temporary and permanent structures
located on the property.
ii. A plan showing how security at the site will be controlled.
, iv. Location of residences and wells within 200 feet of property boundaries
that were in existence at the time of application.
Enacted March 25, 2009 8
v. Blasting plan pursuant to MRSA Title 38 490-Z (0).
vi. A plan showing, in addition to location of hazardous materials,
provisions for safe storage of such material. No hazardous materials
shall be located or stored such that they will enter the ground and
surface water.
vi. An erosion and sedimentation control plan, prepared with standards
. contained in the Maine Erosion and Sediment Control Handbook for
Construction, Best Management Practices, as amended.
vii, A reclamation plan pursuant to Section 2-13 of Article V of this
Ordinance.
Section 3 New Operations
A. The applicant shall submit the following to the Planning Board;
1. Asite plan, prepared by a licensed surveyor, showing the following:
i. Date plan prepared, scale of drawings, with north arrow (indicate true
or magnetic).
ii. Boundaries of land showing lot lines, total acreage, existing and
proposed excavation areas, structures on property, anticipated depth
and height of final excavation, areas to be used for storage of topsoil
and other overburden, location of proposed hazardous material
storage areas, location of public and private streets, parking areas,
roadways and rights of way, location of proposed access roads,
exposed ground water on site, all temporary and permanent structures
located on the property.
iii. A plan showing how security at the site will be controlled. .
iv. Location of residences and wells within 200 feet of property boundaries
that were in existence at the time of application.
v. Blasting plan,-if any.
. vi. A plan showing, in addition to location. of hazardous materials,
provisions for safe storage of such material. No hazardous materials
shall be located or stored such that they will enter the ground and
surface water.
vii. An erosion and sedimentation control plan, prepared with standards
contained in the Maine Erosion and Sediment Control Handbook for
Construction, Best Management Practices, as amended.
viii.A reclamation plan pursuant to Section 2-13 of Article V of this
Ordinance.
ix. A hydro geological evaluation, prepared by a qualified professional,
which shows the depth of ground water throughout the site.
x. A traffic study which sets forth what the maximum estimated volume
of traffic into and out of the MEO will be, which describes the kinds of
Enacted March 25, 2009 9
trucks and equipment which will be going into and out of the MEO,
which describes any existing or potential traffic hazards on roads
servicing the site, and applicant's plans to address them, and which
describes the ability of such roads, physically to withstand the
additional traffic generated by the site. The traffic study shall consider
the actual existing traffic condition in the vicinity of the MEO.
Section 4 Wavier of Submission
Where the Board makes written finding of the fact that there are special
circumstances of a particular MEO such as but not limited to operations permitted
by the Maine Department of Environmental Protection under, Site Location of
Development (MRSA) Title 481 through 490, Performance Standards for excavation
for borrow, clay, topsoil or silt (MRSA) Title 38, Section 490-A through 490-N as
amended and Performance standards for quarries (MRSA) Title 38, Section 490-W
through 490 EE as amended, and any variances from the standards of the
aforementioned articles thus approved by the commissioner, and in MEOs that
affect an area less than one (1) acre and over five thousand (5000) square feet, it
may waive portions of the submission requirements, providing the public health and
safety and welfare are protected, and waivers do not have the effect of nullifying
the intent and purpose of the Comprehensive Plan, or this Ordinance.
Section 5 Application Procedures
A. Application forms for MEOs shall be provided by the Town of Stockton
Springs, and submitted to the CEO, who will submit them to the Planning
Board within seven days.
1. Within thirty (30) days of receiving the application, the Planning Board
shall notify the applicant whether the application is complete, or if
incomplete, the additional material needed for completion. Determination
of completeness by the Planning Board in no way binds the Board as to
the adequacy of the application to meet the criteria of the Ordinance.
2. The application shall be accompanied by a fee as listed in the Town of
Stockton Springs Fee Schedule
B. Public Hearing
Mineral extraction applications for new operations shall require a Public
Hearing and expansions of existing operations may require a Public Hearing.
At the expense of the applicant the Planning Board shall:
1. Advertise a Public Hearing ten (10) days in advance in a local newspaper,
and post notices in appropriate places.
2. Notify by certified mail at least ten (10) days in advance of the Public
Hearing each abutting property owner of the property for which
application is being made.
Enacted March 25, 2009 10
C. Planning Board Decision on the MEO Activity Application
1. Within thirty (30) days of a Public Hearing, or within sixty (60) days of
having received a complete application, the Planning Board shall issue a
decision that the various standards for MEOs have been met, granting or
denying approval of the proposed MEO activity, or approving, with
conditions on such terms as it may deem advisable, to satisfy this
Ordinance. In all instances, the burden of proof shall be on the applicant.
2. Upon approval of the MEO permit, the Board shall sign all five (5) copies
of the of the final site plan. The site plan copies shall be distributed to:
a) the applicant, b) the Planning Board, c) the tax assessor, d) the CEO,
and e) the Town.
3. Approval, by the Planning Board, of an MEO, does not show evidence of
acceptance, by the Town of Stockton Springs, of any road, easement, or
open space on such plan.
Section 6 Inspections
Annual Inspections
The CEO, or his/her designee, shall conduct an annual inspection prior to the
anniversary date of the original permit, to determine whether the permit holder has
complied with, or deviated from, the approved plan. An annual compliance fee is
required as listed in the Town of Stockton Springs Fee Schedule. Reports shall be
provided to the Planning Board, Select Board, and permit holder. In case of non-
compliance, the CEO may issue a STOP WORK ORDER, EXCEPT FOR REMEDIAL ,
ACTION, until such time as compliance is achieved.
Section 7 Conditions and Limitations
A. General
Before a mineral extraction activity begins, the applicant shail obtain all
. applicable permits required by town, state, or federal regulations, laws, or
ordinances regulating such developments. Violation of other permits
necessary for operation shall be considered a violation of this Ordinance.
Before a Fina! Plan has been approved, the following is not permitted:
1. No material from any MEO may be sold.
2. Development of the infrastructure of the MEO is not permitted, including
buildings, roads, and utility installations.
B. Expiration
Mineral extraction permits shall expire one (1) year from the date of
issuance, unless the mineral extraction activity has commenced.
Enacted March 25, 2009 11
C. Plan Revisions
Plan revisions, after approval, shall be made as provided for in Article VII,
Section 2, of this Ordinance.
D. Expert Consultant
In the event the CEO and/or Planning Board require expert consultation, the
charges for same shall be the negotiated among the applicant/operator,
Planning Board, and the CEO.
E. Transfer of Mineral Extraction Permit
When an MEO ownership is transferred, within 30 days:
1. The transferor shall notify the Planning Board of the transfer,
2. The transferee shall file a Notice of Intent to Comply similar to that
required by the MDEP - 38 M.R.S.A. 490 -C (borrow, clay, topsoil, or silt
excavations) and 490-Y (quarries), and
3. The transferee must provide a performance guarantee pursuant to Article
VI. Section 1 of this Ordinance.
ARTICLE V - PERFORMANCE STANDARDS
Section 1 General Requirements
A. Mineral extraction operations shall conform to all applicable State laws and
local ordinances or regulations. Where the provisions of this article conflict
with specific provisions of State laws or other town ordinances, the stricter
provisions shall prevail.
B. The owner and/or operator of a mineral extraction activity shall be
responsible, both jointly and severally, for ensuring the maintenance of all
infrastructures, structures and their sites.
C. In all cases, the applicant shall have the burden of proof that all
requirements, standards, and conditions of this Ordinance and subsequent
approval are met. ,
D. When the CEO and/or Planning Board determine there is a need for testing or
measurements of standards, all reasonable testing shall be at the town's
expense.
Section 2 Performance Standards
A. Unless otherwise noted, and not required in the application requirements,
these-standards apply to all MEOs-over 5000 square feet.
B. Existing MEOs, after registering with the Town, may continue to operate at
their present permitted size and not be regulated by the standards that apply
to expansions and new operations.
C. The owner or operator must comply with the performance standards in this
section unless a variance from the performance standards has been approved
Enacted March 25, 2009 12
by the Maine Department of Environmental Protection and the Town of
Stockton Springs Planning Board.
1. Significant wildlife habitat. Affected land may not be located ina
significant wildlife habitat as defined in Title 38 M.R.S.A. Section 480-B,
or in area listed pursuant to the Natural Areas Program, Title 12, Section
544.
2. Solid waste and sewage disposal. Solid waste, including stumps,
wood waste and land-clearing debris generated on the affected land must
be disposed of in accordance with Maine Department of Environmental
Protection (MDEP) Regulations, Chapter 13 including any rules adopted to
imp!ement those laws.
3. Groundwater protection. To provide an adequate buffer for ground
water and allow for filtration of impurities from surface water, excavation
may not occur within 5 feet of the seasonal high water table.
a. A benchmark sufficient to verify the location of the seasonal high water
table must be established and at least one test pit or monitoring well
must be established on each 5 acres of un-reclaimed land.
b. For new MEOs of five (5) acres or more, a hydro geologic evaluation
performed by a qualified professional, which shows the depth of
groundwater throughout the site.
c. Separations between excavations and private and public water sources
shall conform to MDEP standards contained in 38 M.R.S.A. 490-D,
Performance Standards for Excavations for borrow, clay, topsoil or silt,
or 38 MRSA 490-Z Performance Standards for Quarries.
d. Refueling operations, oil changes, other maintenance activities
requiring the handling of fuels, petroleum products and hydraulic fluids
and other on site activity involving storage or use of products that, if
spilled, may contaminate ground water, must be conducted in
accordance with the Department of Environmental Protection's spill
. prevention, control and countermeasures plan and follow Performance
Standards for the Storage of Petroleum Products as outlined and
included in MDEP's Chapter 378 as amended. Petroleum products and
other substances that may contaminate groundwater must be stored
and handled over impervious surfaces that are designed to contain
spills. Routine maintenance operations are allowed for fixed
. equipment such as screeners, crushers and wash facilities provided
that precautionary measures such as portable drip pans or vacuum
devices are used.
e. Crankcase oil, hydraulic fluids, or similar products shall not be
changed, stored, or disposed of within any work site within the Aquifer
Enacted March 25, 2009 13
District unless specifically covered in an SPCC Plan developed in
accordance with MDEP regulations.
4. Natural buffer strip. Existing vegetation within a natural buffer strip
may not be removed. If vegetation within the natural buffer strip has
been removed or disturbed by the excavation or activities related to the
mineral extraction operation prior to submission, that vegetation must be
reestablished as soon as practical. -
5. Protected natural resources. A natura! buffer strip must be
maintained between the working edge of an excavation and a river,
stream, brook, great pond, coastal wetland or freshwater wetland as
defined in Title 38 M.R.S.A, Section 480-B. The width requirements for
natural buffer strips are as follows:
a. Anatural buffer strip at least 100 feet wide must be maintained
between the mineral extraction operation and the normal high water
line of a great pond classified as GPA, a river flowing to a great pond
classified as GPA.
b. A natural buffer strip at least 75 feet wide must be maintained
between the working edge of the excavation and any river, stream,
brook, coastal wetland or significant wildlife habitat contained within a
freshwater wetland consisting of or containing:
(1) Under normal circumstances, at least 20,000 square feet of
aquatic vegetation, emergent marsh vegetation or open
water, except for artificial ponds, or impoundments; or
(2) Peat lands dominated by shrubs, sedges and sphagnum
moss.
For the purpose of this subsection, the width of a natural buffer strip is
measured from the upland edge of a floodplain wetland. If no
floodplain wetlands are present, the width is measured from the
normal high water mark of the river, stream or brook. The width is
measured from the normal high water mark of a great pond and
upland edge of a freshwater coastal wetland.
6. Public and private roads. A natural buffer strip at least 100 feet wide
must be maintained between the working edge of an excavation and any
public road, or right-of-way and a strip at least 50 feet wide must be
maintained from the edge of any private road or right-of-way.
7. Property boundary and buffers.
a. Anatural buffer strip at least 100 feet wide (quarries) and 50 feet wide
(excavations for borrow, clay, topsoil or silt) must be maintained
between an excavation and any property boundary. With the abutter's
written permission, the natural buffer strips can be reduced to 10
feet, except the distance may not be reduced to less than 25 feet from
the boundary of a cemetery or burial ground.
Enacted March 25, 2009 14
b. The natural buffer strip between excavations owned by abutting
owners may be eliminated with the abutter's written permission,
provided the elimination of this buffer strip does not increase the
runoff from either excavation across the property boundary. Any
permission to reduce a buffer must provide that it remains in effect
until mining ceases and must be recorded in the registry of deeds.
Ail property boundaries must be identified in the field by markings such as
metal posts, stakes, flagging or blazed trees.
8. Erosion and sedimentation control. All reclaimed and un-reclaimed
areas, except for access roads, must be naturally internally drained.
a. All erosion and sedimentation control must conform to standards
outlined in the Maine Erosion and Sediment Control Handbook for
Construction, Best Management Practices, as amended.
b. Stockpiles consisting of topsoil to be used for reclamation must be
seeded, mulched or otherwise temporarily stabilized.
c. Sediment may not Jeave the parcel or enter a protected natural
resource.
d. Grubbed areas not internally drained must be stabilized.
9. Water quality protection and storm water management. Standards
of the laws governing storm water management and waste discharge
must be met as provided in Performance Standards for excavation for
borrow, clay, topsoil or silt (MRSA) Title 38, Section 490-D as amended,
and Performance standards for quarries (MRSA) Title 38, Section 490-Z as
amended
10. Traffic. The following provisions govern traffic:
a. Entrances and exits of the mineral extraction operation onto a public
way must be located, posted and constructed in accordance with
standards for roadways adopted by the Town of Stockton Springs's
Ordinances.
b. Any excavation activity that generates 100 or more passenger car .
equivalents at peak hour must comply with applicable permit
requirements under site location of development (MRSA) Title 38
Article 6, as amended.
11. Noise. Noise levels may not exceed applicable noise limits in rules
adopted by the board of environmental protection, chapter 375.
12. Dustand Air Pollution.
a. All air pollution control shall comply with minimum State requirements
and all applicable equipment must have a current MDEP Air Emissions
License.
b. Dust generated by activities at the MEO site, including dust associated
with traffic to and from the MEO site, must be controlled by sweeping,
paving, watering or other best management practices for control of
Enacted March 25, 2009 15
fugitive emissions. Dust control methods may include the application
of calcium chloride, providing the manufacturer's labeling guidelines
are followed. Visible emissions from a fugitive emission source may
not exceed an opacity of 20% for more than 5 minutes in any one-
hour period.
c. All access/egress roads leading to/from the extraction site to public
ways shall be treated to reduce dust and mud for a distance of at least
100 feet from such public ways, as needed.
d. Loaded vehicles shall comply with all State Laws and Regulations and
be suitably covered to prevent dust and contents from spilling or
blowing from the vehicle. Spillage of extracted materials on public .
roads shall be the responsibility of the vehicle owner/operator.
13. Reclamation. The affected land must be restored to a condition that
is similar to or compatible with the conditions that existed before
excavation. Reclamation shall be conducted in accordance with the
MDEP's best management practices for erosion and sedimentation control
and must follow Performance Standards for excavation for borrow, clay,
topsoil or silt (MRSA) Title 38, Section 490-D (14) as amended, or
Performance standards for quarries (MRSA) Title 38, Section 490-Z (13)
a. The Planning Board may require a performance guarantee as described
in article VI of this ordinance to assure Reclamation is completed.
14. Blasting. Blasting must be conducted in accordance with
Performance standards for quarries (MRSA) Title 38, Section 490-Z (14). .
a. Acopy of the blasting plan as required under Performance standards
for quarries (MRSA) Title 38, Section 490-Z (14) shall be submitted to
. the town.
15. Hours of Operation.
The following shall apply to specific applications of the operation.
Blasting 7am- 7pm Monday-Saturday
Drilling 7am---- 7pm Monday-Saturday
- Crushing & Processing 7am- 7pm Monday-Saturday
Loading 6am- 7pm Monday-Saturday
Loading Only 7am- 7pm Sunday
a. No operations are allowed at night, on Sunday (except as indicated
above) or on the following holidays; Memorial Day, Fourth of July,
Labor Day, Thanksgiving, and Christmas unless approved by the
planning board or in case of emergency requests the CEO.
b. In the case of emergency requests for sand or gravel from public
safety officials, the above hours may be waived.
Enacted March 25, 2009 16
16. Security. Access to the mineral extraction operation shall be strictly
controlled with locking gates at the entrance of access roads.
17. Signs and Lighting. Signs and lightening must comply with other
applicable Zoning ordinance for the town of Stockton Springs. Lighting on
the premises shall be shielded in such a manner as to prevent glare from
extending beyond the lot lines.
ARTICLE VI - PERFORMANCE GUARANTEES
Section 1 Types and Contents of Guarantees
The Town may require a bond payable to the Town of Stockton Springs with
sureties satisfactory to the town or such other security as the planning board may
determine adequately secures compliance with this article, conditioned upon the
faithful performance of the requirements set for in Article V - Performance
Standards for Reclamation. Other security may include a security deposit with the
town, an escrow account and agreement, insurance or an irrevocable trust. In
determining the amount of the bond or security, the planning board shall take into
consideration the character and nature of the overburden, the future suitable use of
the land involved and the cost of grading and reclamation required. All proceeds of
forfeited bonds or other security must be expended by the town for the reclamation
of the area for which the bond was posted and any remainder returned to the
operator. If a guarantee is already held with the state of Maine for this land the .
planning board shall waive this requirement.
Section 2 Release of Guarantees
Prior to the release of the Performance Guarantee, the Planning Board shall
determine, after consultation with the CEO or a certified engineer or other ,
consultant(s), that the reclamation meets the requirements of that portion of the
project requested.
ARTICLE VII - MISCELLANEOUS
Section 1 Fees
a. Application Fee as listed in the Town of Stockton Springs Fee Schedule.
b. An Annual Fee as listed in the Town of Stockton Springs Fee Schedule shall .
be paid to the town of Stockton Springs:
i. The town of Stockton Springs will bill each owner/operator one month
prior to the annual fee due date each year.
Enacted March 25, 2009 17
Section 2 Amendment after Approval
No modifications shall be made in an approved Final Plan unless they
have been resubmitted to and approved by the Planning Board. The intensity of
the review will be determined by the Planning Board, and depends upon the
complexity of the proposed alterations.
Section 3 Enforcement
The CEO may order the owner or operator of a MEO that is not operating
in compliance with this ordinance to cease operations until the noncompliance is
| corrected, stop work order.
Section 4 Right of Entry onto the Land
The CEO shall have the right of entry onto any mineral extraction activity
site at reasonable times and after reasonable notice. If the operator, or its
employee or agent, interferes with an inspection by the CEO, the CEO may seek an
administrative search warrant pursuant to court rule 80E, and the operator shall
pay the town a civil penalty of $500.00 plus any legal fees incurred in obtaining
that warrant.
Section 5 Penalties
Any person, firm, corporation, or other entity being the owner, or having
control or responsibility for any MEO, who violates the terms or conditions of any
MEO permit, approved by the planning Board, or who proceeds without a permit,
shall be deemed a nuisance, and shall be subject to a civil penalty, expert witness
fees, cost of court, and legal fees due and payable to the Town of Stockton Springs,
in an amount determined by the court in accordance with the penalty provisions of
30-A M.R.S.A. Section 4452.
Section 6 Appeals and Variances
A. Administrative Appeals and Variances
Variances from the requirements of this Mineral Extraction Ordinance may
only be granted by the Stockton Springs Board of Appeals.
B. Appeal to Superior Court
Any aggrieved party having proper standing may appeal any decision of the
Appeals Board under this Ordinance to the Superior Court of Waldo County,
within 45 days of a written decision in accordance with Maine State Law.
Enacted March 25, 2009 18
ARTICLE Vii - SEVERABILITY AND CONFLICT
Section 1 Severability
Should any section of this Ordinance be declared, by court of competent
jurisdiction, to be invalid for any reason, such decision shall not invalidate any
other section or provision of this Ordinance.
Section 2 Conflict with other Ordinances
Whenever the requirements of this Ordinance are in conflict with the
requirements of any other lawfully adopted rule, regulation, or ordinance, that
imposing the most restrictive or higher standard shall govern.
ARTICLE IX - AMENDMENT OF THIS ORDINANCE
Section 1 Initiation of Amendment
A proposal to amend this Ordinance may be initiated by:
A. The Planning Board, by majority vote;
B. The Select Board, through a request to the Planning Board; or
C. The public, through a written petition of a number of voters equal to at least
10% of the number of votes cast in the town at the last gubernatorial
election, but in no case less than 10. When an amendment to this Ordinance
is proposed by other than the municipal officers or Planning Board, a fee of
one hundred dollars ($100) shall accompany the proposal to cover the cost of
review, hearings and advertisements. This fee is non-refundable.
Section 2 Process of Adoption .
The process to be followed in adopting an amendment to this Ordinance is as
follows:
A. Proposed amendments must first be submitted to the Planning Board for
consideration;
B. The Planning Board shall, within thirty (30) days of receiving a proposed
amendment, set a date to hold a public hearing on the proposed
amendment;
C. Notice of the public hearing shall be given as required by State Law;
D. The Planning Board shall make its official report at a Select Board meeting
occurring within sixty (60) days after the public hearing;
Enacted March 25, 2009 19
E. If the Planning Board votes and reports to the Select Board that the .
amendment ought not to pass, because in the Board's opinion (i) the
amendment is contrary to the Town's Comprehensive Plan, or (ii) it will not
act to protect the public health, safety, and general welfare of the citizens of
Stockton Springs, its environment, or its wildlife, enactment of that proposed
amendment shall require a two-thirds (2/3) vote of the voters present at the
town meeting; and
F. Enactment of a proposed amendment having the approval of the Planning
Board shall require only a majority of the voters present to enact the
amendment.
ARTICLE X - OTHER PROVISIONS
Section 1 Public Access to Information
Except as made confidential by law, the Planning Board will make all documents
and records available to the public in accordance with the Maine Freedom of Access
Law, (Title 1 M.R.S.A. Section 401 et. Seq.)
Section 2 Adjoining Mineral Extraction Activity Under Common Scheme
Development
Adjoining mineral extraction activity under common scheme of development
separated by less than 500 feet of unaffected land shall be required to fulfill all the
requirements as established in this Ordinance for the total size of the extraction
area, including the adjoining site.
' ARTICLE XI ~- DEFINITIONS
Active Extraction Area: The extraction area including side slopes and adjoining
areas with overburden removed, excluding roads, structures, stockpile areas, etc.
not part of the active mineral extraction operation.
Affected Land: The land-area from which the overburden will be or has been
removed; land upon which stumps, spoil, or other solid waste will be or has been .
deposited; and any storage area that will be or has been used in connection with
the development, except a natural buffer strip.
Aquifer: An underground bed or stratum of earth, gravel or porous stone that
contains water.
Enacted March 25, 2009 20
Blasting: The use of explosives to break up or otherwise aid in the extraction or
removal of a rock or other consolidated natural formations.
Borrow Pit: A development undertaken for the primary purpose of excavating
borrow, clay, topsoil, and/or silt.
Expansion of Existing Operation: Extraction operations that exceed the existing
state permitted boundaries
For operations less than five (5) acres in active extraction area as of the effective
date, expansion is defined as before an excavation exceeds 5 acres in reclaimed
and un-reclaimed land. For operations larger than five (5) acres, expansion is
defined as before an excavation exceeds 10 acres in reclaimed and un-reclaimed
land.
Existing State Permitted Boundaries: Permitted Mineral Extraction Operations
pursuant to but not limited to operations permitted by the Maine Department of
Environmental Protection under, Site Location of Development (MRSA) Title 481
through 490, Performance Standards for excavation for borrow, clay, topsoil or silt
(MRSA) Title 38, Section 490-A through 490-N as amended and Performance
standards for quarries (MRSA) Title 38, Section 490-W through 490 EE as
amended, and any variances from the standards of the aforementioned articles thus
approved by the commissioner.
Ground Water: The water beneath the surface of the ground, consisting largely of
surface water that has seeped down; the source of water in springs and wells.
Mineral Extraction Operation (MEQ): Any excavation or removal, handling, or
storage of borrow, clay, topsoil, silt, or rock whether alone or in combination.
Mineral Extraction Site or Area: Al! of the land area disturbed or otherwise
developed for the extraction, handling, removal, processing, or storage of borrow,
clay, topsoil, silt, or rock.
Natural Buffer Strip: An undisturbed area or belt of land that is covered with
trees or other vegetation.
Normal High-Water Line: That-line which is apparent from visible markings,
changes in the character of soils due to prolonged action of water, or changes in
~ vegetation, and which distinguishes between predominantly aquatic and
predominantly terrestrial land. In the case of wetlands adjacent to rivers and great
ponds, the normal high-water line is the upland edge of the wetland, and not the
edge of the open water.
Overburden. The earth and other materials naturally lying over the product to be
removed.
Passenger car equivalents at peak hour: The number of passenger Cars, or, in
the case of non-passenger vehicles, the number of passenger cars that would be
displaced by non-passenger vehicles, that pass through an intersection or on a
roadway under prevailing roadway and traffic conditions at that hour of the day
during which the traffic volume generated by the MEO is higher than the volume
Enacted March 25, 2009 21
during any other hour of the day. For the purpose of this ordinance, one tractor- .
trailer combination is the equivalent of 2 passenger cars.
Processing: Any washing, screening, crushing, and mixing of borrow, clay,
topsoil, silt, and/ or rock.
Protected Natural Resource: As defined in applicable State Law, section 480-B,
subsection 8.
Quarry: A place where rock is extracted.
Reclamation: The are of land affected by excavations, including but not limited
to, the stabilization of slopes and creation of safety benches, the planting of forests,
the seeding of grasses and legumes for grazing purposes, the planting of crops for
harvest, the enhancement of wildlife and aquatic habitat and aquatic resources and
the development of the site for residential, commercial, recreational or industrial
use.
Road: Public and private owned ways such as alleys, avenues, boulevards,
highways, roads, streets, lanes, and other rights of way, as well as areas on
mineral extraction activity plans designated as rights of way.
Seasonal High-Water Table: That part of the year when the water table is at its
highest level.
Setback: The horizontal distance from a lot line or referred location to the nearest
part of a structure or activity.
Setback from Water: The horizontal distance from the normal high water mark to
the nearest part of a structure or activity.
Silt or Clay: A material that consists of particles of such a size that 45% or more
of the fraction of those particles are able to pass through a 3-inch sieve pass
through the United States Standard Number 200 sieve, or a materia! that exhibits
similar erosion potential, difficulty of stabilization or runoff based upon gradations,
plasticity, permeability or other relevant criteria.
Structure: Anything built for the support, shelter, or enclosure of persons,
animals, goods, or property of any kind, together with anything constructed or
, erected with a fixed location on or in the ground, exclusive of fences. The term
- includes structures temporarily or permanently located, such as decks, raised
walkways, handicapped access ramps, and satellite dishes.
Surface Water: Any water flowing on the surface, either channelized or by sheet
flow including, but not limited to, rivers, streams, brooks, ponds, lakes, and any
swamp, marsh, bog, or other contiguous lowland where water is periodically
collected on the surface.
Topsoil: The top layer of soil that is predominantly fertile and ordinarily moved in
tillage or the equivalent of such a layer in uncultivated soils,
Wavier: A relaxation of the terms of the Ordinance where such a wavier would not
be contrary to the public interest, where owing to existing conditions or operations,
a literal enforcement of this Ordinance would result in an unnecessary or undue
Enacted March 25, 2009 22
hardship, and where the intent of the Ordinance or item being waivered can be met
in some other appropriate manner, as determined by the Planning Board.
Water Table: The upper surface of groundwater, or that level below which the soil
is seasonally saturated with water.
Enacted March 25, 2009 23
Town of ae ; .
Stockton Springs Town of Stockton Springs
Maine . ' .
P.O, Ror 339 Mineral Extraction Operations Fee Schedule
Stockron, Springs, ME (498! :
Mineral Extraction Fees pe Comments
$100 Less than 1 acre.
--CC--CCdEC $200 1.0-4.9 acres
CC $300 5.0-30 acres
PT $600
CT
Application Fees $100 Less than 1 acre
PC $250 1.0-4.9 acres
Pe $500 5.0-30 acres
ee $1000 Over 30.1 acres
$300
--t™~--OCOCSY 50 Over Sst acres _|
: "og , ' . he wet ;
mS Effective March 25, 2009
.
+ :