Stockton Springs
Stockton, Springs, ME 0498]
'Shoreland Zoning
a
'(Ordinance for the Town
'of Stockton Springs
Adopted by the Town of Stockton Springs on June 19, 1974
Amended on June 19, 1999
Amended on March 11, 2000
Amended on March 25, 2009
Amended on June 20, 2009
Amended on June 19, 2010
Amended on June 13, 2015
ATTEST:
Town Clerk
DATE: Guns 15 ,ADIS
€
é a,
Contents
Shoreland Zoning Ordinance for the Town of Stockton Springs ......c.cscsecsssecessseeessssessssssnessseeersssseseseeresA
SECTION 1. PULPOSES .......ccsccsessssscscssscssessscescseseccescnesecescaseesseneneessseaessessreracissesesensnecssansasssessssertsseasssesacsenseseesE
Section 2. AUthority.....c.cccccccsscsssusesessessssssesssessssssssessssssssesssseecsssesesscsescsevesesseseneaesensesterecassecseasesssaseasssesesseeseseeAh
Section 3. Applicability. .........ccccscsescescseeeeseesesseessesessesesesssseesssetsnsessscsenseesseseaseusanscsrenscssesnsessesesaneeenensasssesieeAh
Section 4. Effective Date of the Ordinance and Ordinance AMendmMents. ........cscssesersereeceerrerecsessseereereeseed
Section 5. Availability, ...........sccccscsssssescssssssessesssssescsessesesesseassesesseseseesassensessatecaesesecevasesseaucncacseseseeeeeeessssssesse)
Section 6. Severability. .........cccsccccsssseccssescssssecessssessceteceeeseseneescseeesecseeceneeseseasiasseasonscassaneseesasesseeerensnesseseens)
Section 7. Conflicts with Other Ordinances. .........csccesssesssscessssecsesscensenscsesnesseteceersessesesseeesautasesnaseneenseesen)
Section 8. AMENAMENCS. ......ccecccscccsccesceeccescscececsccuscsuscscuucssecceesesesaseaseneesuecerssensenseasseaeeacessesaeeneseeeesassnseest
Section 9. District and Zoning Map. .....scsccscsccsssssssssessesscsccsesceesseeesseeseaseeneesecssseeeedeeseessenscsscsrerssassseeeesnaeseseeten)
Section 10. Interpretation of District BOUNGATICS..........c:cccceeeteeeesseeecteeeeeeesstscsenssseecesacesecsseeestsaeeserseseeteeseO
Section 11. Land Use Requirements. .......:.cccccccssssessesseescneesseseessenessecsecseeesesessessestessnserssnscsesseqeerersanseserseseneeneO
Section 12. NON-COMFOFMANCE. ...cceccecccesscssesssscersceeteessnecatesseconetesseseecaesacenseaecsetsccaeracessreaseatsonsecersnacesseeseareeseO
Section 13. Establishment of Districts..........cc:ccccsccccsssssscsscsscssceerseescsesssenecssecsssessecsseessseeersetonecsssrecestenseeens bd
Section 14. Table of Land USeS. .......sssssccsssesssessssssssessesssssesescseeeeessssessssecsesesesseseseesseeerserseacenasesstssecessees dA .
Section 15. Land Use Standards ......cccccccccessscccsssssssssseecsseessssesenessecsessssaseussaeseeesseacessnatessessesessesssessssensansee LZ
Section 16. Administration .........ccccccccccccscsscescccsssessessceescsssesrecsesnecseessesesessenssaessecsseaesaseaesseesaseessonseasansansaesene a
Section 17. Definitions .....c...ccccccescccssccessssccsssscccssccsceesceseessecsessesoussesscescesevseseetsseartsaeaeteesessesssersensseeen se A
3
Shoreland Zoning Ordinance for the Town of Stockton Springs
section 1. Purpeses
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect commercial fishing and maritime industries; to --
protect freshwater and coastal wetlands; to control building sites, placement of structures and land
uses; to conserve shore cover and visual as well as actual points of access to inland and coastal
waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
Section 2. Authority.
This Ordinance has been prepared in accordance with the provisions of Title 38 section 435-449 of
the Maine Revised Statutes Annotated (M.S.R.A.).
Section 3. Applicability.
This Ordinance applies to all land areas within two hundred fifty (250) feet, horizontal distance, of
the
¢ normal high-water line of any great pond,
¢ the upland edge of a coastal wetland, including all areas affected by tidal action,
or
e upland edge of a freshwater wetland,
and all areas within seventy-five (75) feet, horizontal distance, of the normal high-water line of a
stream.
This Ordinance also applies to any structure built on, over, or abutting a dock, wharf, or pier, or
other structure extending or located below the normal high-water line of a water body or within a
wetland.
Section4, Effective Date of the Ordinance and Ordinance Amendments.
This Ordinance, which was adopted by the municipal legislative body of Stockton Springs on June 13,
2015, shall not be effective unless approved by the Commissioner of the Department of
Environmental Protection. A certified copy of the Ordinance, attested and signed by the Municipal
Clerk, shall be forwarded to the Commissioner for approval. If the Commissioner fails to act on this
Ordinance or Ordinance Amendment within forty-five (45) days of his/her receipt of the Ordinance or
Ordinance Amendment, it shall be automatically approved.
4
Section 5. Availability.
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
Section 6. Severability.
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
Section 7. Conflicts with Other Ordinances.
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of
this Ordinance or any other ordinance, regulation, or statute administered by the municipality, the
more restrictive provision shall control.
Section 8. Amendments.
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments,
attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following the adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
Section 9 District and Zoning Map.
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Shoreland Zoning Map which is (are)
made a part of this Ordinance:
1. Resource Protection
2. Limited Residential .
3. Limited Commercial
4. Commercial Fisheries/Maritime Activities
5. Stream Protection
5
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1" =
2000 feet. District boundaries shall be clearly delineated and a legend indicating the symbols for
each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be
certified by the attested signature of the Municipal Clerk and shall be located in the municipal
office.
D. Changes to the Official Shoreland Zoning Map.|f amendments, in accordance with Section 8,
are made in the district boundaries or other matter portrayed on the Official Shoreland Zoning
Map, such changes shall be made on the Official Shoreland Zoning Map within thirty (30) days
after the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
Section 10. Interpretation of District Boundaries.
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are property
lines, the centerlines of streets, roads and rights of way, and the boundaries of the shoreland area as
defined herein. Where uncertainty exists as to the exact location of district boundary lines, the Board
of Appeals shall be the final authority as to location.
Section 11. Land Use Requirements.
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered, and no new lot shall be created except in conformity with all the regulations
herein specified for the district in which it is located, unless a variance is granted.
Section 12. Nom-comformance.
A. Purpose It is the intent of this Ordinance to promote land use conformities, except non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except
as otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to be
more non-conforming.
B. General
1. Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred,
and the new owner may continue the non-conforming use or continue to use the non-
conforming structure or lot, subject to the provisions of this Ordinance.
6
2. Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep
and maintenance of non-conforming uses and structures including repairs or renovations
that do not involve expansion of the non-conforming use or structure, and such other
changes .in a non-conforming use or structure as federal, state, or local building and
safety codes may require.
C. Non-conforming Structures
1. Expansions. All new principal and accessory structures, excluding functionally water-
dependent uses, must meet the water body, tributary stream, or wetland setback
requirements contained in Section 15(B)(1). A non-conforming structure may be added to
or expanded after obtaining a permit from the same permitting authority as that for a
new structure, if such addition or expansion does not increase the non-conformity of the
structure, and is in accordance with subparagraph (a) and (b) below.
(a) Expansion of any portion of a structure within 25 feet of the normal high-water line
of a water body, tributary stream, or upland edge of a wetland _ is prohibited, even if the
expansion will not increase nonconformity with the water body, tributary stream or
wetland setback requirement. Expansion of accessory structure that is located closer to
the normal high-water line of a water body, tributary stream, or upland edge of a wetland
than the principal structure is prohibited, even if the expansion will not increase
nonconformity with the water body, tributary stream, or wetland setback requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal
structure is entirely located less than 25 feet from the normal high-water of a water body,
tributary stream, or upland edge of a wetland, that structure may be expanded as follows,
as long as all other applicable municipal land use standards are meet and the expansion is
not prohibited by Section 12(C)(1).
(i) The maximum total footprint for the principal structure may not be expanded to a
size greater than 800 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the principal
structure may not be made greater than 15 feet or the height of the existing
structure, whichever is greater.
(c) All other legally existing nonconforming principal and accessory structures that do not
meet the water body, tributary stream, or wetland setback requirements may be
expanded Or altered as follows, as long as other applicable municipal land use standards
are met and the expansion is not prohibited by Section 12(C)(1)(a), above.
(i) For structures located less than 75 feet from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland, the maximum combined total
7
footprint for all structures may not be expanded to a size greater than 1,000
square feet or 30% larger than the footprint that existed on January 1, 1989,
whichever is greater. The maximum height of any structure may not be made
greater than 20 feet or the height of the existing structure, whichever is greater.
(ii) For structures located less than 100 feet from the normal high-water line of a
great pond classified as GPA or a river flowing to a great pond classified as GPA,
the maximum combined total footprint for all structures may not be expanded to
a size greater than 1,500 square feet or 30% larger than the footprint that existed
on January 1, 1989, whichever is greater. The maximum height of any structure
may not be made greater than 25 feet or the height of the existing structure,
whichever is greater. Any portion of those structures located less than 75 feet
from the normal high-water line of a water body, tributary stream, or upland edge
of a wetland must meet the footprint and height limits in Section 12(C)(1)(b)(i) and
Section 12(C)(1)({c)(i), above.
. (iii)In addition to the limitations in subparagraphs (i) and (ii), for structures that are
legally nonconforming due to their location within the Resource Protection District
when located at less than 250 feet from the normal high-water line of a water
body or the upland edge of a wetland, the maximum combined total footprint for
all structures may not be expanded to a size greater than 1,500 square feet or 30%
larger than the footprint that existed at the time the Resource Protection District
was established on the lot, whichever is greater. The maximum height of any
structure may not be made greater than 25 feet or the height of the existing
structure, whichever is greater, except that any portion of those structures
located less than 75 feet from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland must meet the footprint and height
limits in Section 12(C)(1)(b){i} and Section (C){1) or Section 12(C)(1){a}, above.
(d) An approved plan for expansion of a nonconforming structure must be
recorded by the applicant with the registry of deeds, within 90 days of approval. The
recorded plan must show the existing and proposed footprint of the nonconforming
structure, the existing and proposed structure height, the footprint of any other
structures on the parcel, the shoreland zone boundary and evidence of approval by
the municipal review authority.
2. Foundations. Whenever a new, enlarged, or replacement foundation is constructed under a
non-conforming structure, the structure and new foundation must be placed such that
the setback requirement is met to the greatest practical extent as determined by the
Planning Board or its designee, basing its decision on the criteria specified in Section
12(C3) Relocation, below.
8
3. Relocation. A non-conforming structure may be relocated within the boundaries of the
parcel on which the structure is located provided that the site of relocation conforms to all
setback requirements to the greatest practical extent as determined by the Planning Board or
its designee, and provided that the applicant demonstrates that the present subsurface
sewage disposal system meets the requirements of State law and the State of Maine
Subsurface Wastewater Disposal Rules (Rules), or that a new system can be installed in
compliance with the law and said Rules. In no case shall a structure be relocated in a manner
that causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for
septic systems, and the type and amount of vegetation to be removed to accomplish the
relocation. When it is necessary to remove vegetation within the water or wetland setback
area in order to relocate a structure, the Planning Board shall require replanting of native
vegetation to compensate for the destroyed vegetation, in accordance with Section 15(P-3).
In addition, the area from which the relocated structure was removed must be replanted
with vegetation. Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one
native 'tree, three (3) feet in height, for every tree removed. If more than five trees are
planted, no one species of tree shall make up more than 50% of the number of trees
planted. Replaced trees must be planted no further from the water or wetland than the
trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where the vegetation and/or ground cover was disturbed,
damaged, or removed must be re-established within the setback area. The vegetation
and/or ground cover must consist of similar native vegetation and/or ground cover that
was disturbed or removed.
(b) Where feasible, when a structure is relocated on a parcel, the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees,
or a combination thereof.
4. Reconstruction or Replacement. Any non-conforming structure which is located less than
the required setback from a water body, tributary stream, or wetland and which is removed,
or damaged, or destroyed, regardless of the cause, by more than 50% of the market value of
the structure before such damage, destruction, or removal, may be reconstructed or replaced
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in
compliance with the water body, tributary stream, or wetland setback requirements to the
9
greatest practical extent as determined by the Planning Board or its designee in accordance
with the purposes of this Ordinance. In no case shall a structure be reconstructed or replaced
so as to increase its non-conformity. If the reconstructed or replacement structure is less
than the required setback it shall not be any larger than the original structure, except
pursuant to Section 12(C) (1) above, as determined by the non-conforming footprint of the
reconstructed or replaced structure at its new location. If the total footprint of original
structure can be relocated or reconstructed beyond the required setback, no portion of the
relocated or reconstructed structure shall be replaced or constructed at less than the setback
requirement for a new structure. When it is necessary to remove vegetation in order to
replace or reconstruct a structure, vegetation shall be replanted in accordance with Section
12(C) (3) above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less or the market value,
or damaged or destroyed by 50% or less of market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent, the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(3) above, the physical condition and type of foundation present, if
any.
5. Change of Use of a Non-conforming Structure. The use of a non-conforming structure may
not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources
than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and commercial fishing and maritime
activities, and other functionally water-dependent uses.
D. Non-conforming Uses
1. Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
10
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1) above.
2. Resumption Prohibited. A lot, building, or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption for a use of a residential structure provided that
the structure has been used or maintained for residential purposes during the preceding five
(5) year period.
3. Change of Use. An existing non-conforming use may be changed to another non-conforming
use provided that the proposed use has no greater adverse impact on the subject and
adjacent properties and resources, including water dependent uses in the CFMA district, than
the former use, as determined by the Planning Board. The determination of no greater
adverse impact shall be made according to criteria listed in Section 12(C)(5) above.
E. Non-conforming Lots
1. Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership and that all provisions of this Ordinance except lot area, lot width, and shore
frontage can be met. Variance relating to setback or other requirements not involving lot area,
lot width, or shore frontage shall be obtained by action of the Board of Appeals.
2. Contiguous Built Lots: If two or more contiguous lots or parcels are in single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use of structure
exists on each lot, the non-conforming lots can be conveyed separately or together, provided
that the State Minimum Lot Size Law (12 M.R.S.A. section 4807-A through 4807-D) and State
of Maine Subsurface Wastewater Disposal Rules are complied with.
3. Contiguous Lots -- Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on November 24, 1994, and recorded in
the registry of deeds if the lot is served by a public sewer or can accommodate a subsurface
11
sewage disposal system in conformance with the State of Maine Subsurface Wastewater
Disposal Rules, and:
a. Each lot contains at least one hundred (100) feet of shore frontage and at least 20,000 sq.
feet of lot area; or
b. Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 sq. feet of lot area.
Section 13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone, exclusive of Stream Protection District, except that areas which
are currently developed and areas which meet the criteria for the Limited Commercial, General
Development I, or Commercial Fisheries/Maritime Activities Districts need not be included in the
Resource Protection District. ,
1. Areas within two hundred fifty (250) feet, horizontal distance, of the upland edge of
freshwater wetlands, salt marshes and salt meadow, and wetlands associated with great
ponds and rivers, which are rated "moderate" or "high" value waterfowl and wading bird
habitat, including nesting and feeding areas, by the Maine Department of Inland Fisheries
and Wildlife (MDIF&W) that are depicted on a Geographic Information System (GIS) data
layer maintained by either MDIF&W or the Department. Coastal wetlands are rated as of
January 1, 1973. Freshwater wetlands are rated as of May 1, 2006. For the purposes of this
paragraph "wetlands associated with great ponds and rivers" shall mean areas characterized
by non-forested wetland vegetation and hydric soils that are contiguous with a great pond or
river, and have a surface elevation at or below the water level of the great pond or river
during the period of normal high water. "Wetlands associated with great ponds or rivers" are
considered to be part of that great pond or river.
2. This district shall also include 100 year floodplains adjacent to tidal waters as shown on the
Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or Flood
Hazard Boundary Maps.
3. Areas of two or more contiguous acres with sustained slopes of 20% or greater.
12
4. Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater or coastal wetland as defined, and which are not surficially
connected to a water body during the period of normal high water.
5. Land areas along streams subject to severe bank erosion, undercutting, or river bed
movement and lands adjacent to tidal waters which are subject to severe erosion or mass
movement, such as steep coastal bluffs.
B. Limited Residential District. The Limited Residential District includes those areas suitable for
residential and recreational development. It includes areas other than those in the Resource
Protection District, or Stream Protection District, and areas which are used less intensively than
those in the Limited Commercial District, the General Development Districts, or the Commercial
Fisheries/Maritime Activities District.
C. Limited Commercial District. The Limited Commercial District includes areas of mixed, light
commercial and residential uses, exclusive of the Stream Protection District, which should not be
developed as intensively as the General Development Districts. This District includes areas of two
or more contiguous acres in size devoted to a mix of residential and low density business and
commercial uses. Industrial uses are prohibited.
D. Commercial Fisheries/Maritime Activities District. The Commercial Fisheries/Maritime
Activities District includes areas where the existing predominant pattern of development is
consistent with the allowed uses for this district as indicated in the Table of Land Uses, Section
14, and other areas which are suitable for functionally water dependent uses, taking into
consideration such factors as:
(1) Shelter from prevailing winds and waves;
(2) Slope of the land within two hundred fifty (250) feet, horizontal distance, of the
shoreline;
(3) Depth of water within one hundred fifty (150) feet, horizontal distance, of the shoreline;
(4) Available support facilities including utilities and transportation facilities; and
(5) Compatibility with adjacent upland uses.
E. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream, exclusive of
those areas within two-hundred and fifty (250) feet, horizontal distance, of the normal high-
water line of a great pond or within two-hundred and fifty (250) feet, horizontal distance, of the
upland edge of a freshwater or coastal wetland. Where a stream and its associated shoreland
area is located within two-hundred and fifty (250) feet, horizontal distance, of the above water
bodies or wetlands, that land area shall be regulated under the terms of the shoreland district
associated with the water body or wetland.
13
Section 14. Table of Land Uses.
All land use activities permitted in this district shall conform with all of the applicable Land Use
Standards of this Ordinance. The district designation for a particular site shall be determined from
the Official Shoreland Zoning Map of the Town of Stockton Springs.
Key to Table 1:
Yes Allowed, (no permit required, but the use must comply with all applicable land use
standards.)
No Prohibited
PB Allowed with permit issued by the Planning Board
CEO Allowed with permit issued by the Code Enforcement Officer
LPI Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP Resource Protection
LR Limited Residential
LC Limited Commercial
CFMA Commercial Fisheries/Maritime Activities
SP Stream Protection
The following notes are applicable to the Land Use Tables on the following page:
NOTE: The term "functionally water-dependent use" as define, includes a very diverse group of uses
ranging from large, industrial facilities that receive shipments by water or use water for cooling, to
traditional commercial fishing enterprises and public shorefront parks. Communities are encouraged
to define the functionally water-dependent uses which are to be allowed and which are prohibited in
each CFMA district, based upon considerations of prevailing existing uses, desired future uses,
available support, site suitability and compatibility with adjacent uses. A municipality can narrow the
range of allowed uses by precluding certain water-dependent uses, or by adopting conditional uses
for certain functionally water-dependent uses that it determines would only be compatible with its
plan for the waterfront under certain conditions.
NOTE: Recreational water-dependent uses such as marinas and excursion vessels may in some
communities displace or threaten to displace traditional commercial fisheries and maritime
activities. Therefore communities may wish to preclude or further limit these types of uses in this
district in order to protect berthing space and onshore staging areas for commercial fishing
enterprise.
14
TABLE 1. LAND USES IN SHORELAND ZONE
LAND USES DISTRICT
SP RP LR L¢ CEMA
1. Non-intensive recreational uses not requiring structures such as yes yes yes yes yes
hunting, fishing, and hiking
2. Motorized vehicular traffic on existing roads and traits yes yes yes yes yes
5. Clearing or removal of vegetation activities other than timber harvesting CEO CEO1 CEO CEO CEO
6. 'Fire prevention activities yes yes yes yes yes
7. Wildlife management practices yes yes yes yes yes
8. Soil and water conservation practices yes yes yes yes yes
5. Mineral exploration , no yes2 yes2 yes2 yes2
10. Mineral extraction including sand and gravel extraction no PB3,13 PB13 PB13 PB13
11. Surveying and resource analysis yes yes yes yes yes
12. Emergency operations yes yes yes yes yes
13. Agriculture yes PB yes yes yes
14. Aquaculture PB PB PB yes yes
15. Principal structures and use
A. One and two family residential, including driveways PB4 PBS CEO CEO no
B, Multi-unit residential no no PB PB no
C. Commercial no no10 no10 PB PBS
D. Industrial no no no no PBS
E. Governmental and institutional no no PB PB PBS
F. Small non-residential facilities for educational, scientific, or nature interpretation PB4 PB cEO CEO PBS .
16. Structures accessory to allowed uses PB4 PB CEO CEO yes
17. Piers, docks, wharfs, bridges, and other structures and uses extending over or below the
normal high-water line or within a wetland
a, Temporary CEO11 CEO11 CEO11 CEO11 CEO11
b. Permanent PB PB PB PB PBS
18. Conversion of seasonal residences to year-round residences LPI LPI LPI LPI no
19. Home occupations PB PB PB CEO yes
20, Private sewage disposal systems for allowed uses LPI LPI LPI LPI LPI
21. Essential services
A. Roadside distribution lines (34.5kV or lower) CEO6 CEO6 y e512 yes12 yes12
B. Non-roadside or cross-country distribution lines involving ten poles or less
in the shoreland zone PB6 PB6 CEO CEO CEO
C. Non-roadside or cross-country distribution lines involving eleven or more poles
in the shoreland zone PB6 PB6 PB PB PB
D. Other essential services PB6 PBS PB PB PB
22. Service drops, as defined, for allowed uses yes yes yes yes yes
23. Public and private recreational areas involving minimal structural development PB PB PB CEO CEOS
24. Individual, private campsites CEO CEO CEO CEO CEO
25. Campgrounds no no7 PB PB no
26. Road construction PB nog P8 PB PBS
27. band management roads yes PB yes yes yes
28. Parking facilities no no7 PB PB PB5
29. Marinas PB no PB PB PB
30. Filling and earth moving <10 cubic yards CEO CEO yes yes yes
31. Filling and earth moving >10 cubic yards PB PB CEO CEO CEO
32. Signs yes yes yes yes yes
33. Uses similar to allowed uses CEO CEO CEO CEO CEO
34. Uses similar to uses requiring a CEO permit CEO CEO CEO CEO CEO
35. Uses similar to uses requiring a PB permit PB PB PB PB PB
45
Notes:
1. In RP not allowed within 75 feet horizontal distance of the normal high-water line of great ponds, except to remove safety hazards.
2. Requires permit from Planning Board if more than 100 sq. feet of surface area, in total, is disturbed.
3. In RP not allowed in areas so designated because of wildlife value. ;
4. Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5. Functionally water-dependent uses and uses accessory to such water-dependent uses only.
6. See further restrictions in Section 15.L.2. :
7. Except when area is zoned for resource protection due to floodplain criteria, in which case a permit is required from the Planning Board.
8. Except as provided in Section 15(H)(4) .
9. Single family residential structures may be allowed by Special Exception only, according to the provisions of Section 16,(E}. Two-family residential
structures are prohibited.
10. Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
11, Excluding bridges and other crossings not involving earthwork, in which case a permit is not required.
12. Permit not required but must file a written "notice of intent to construct" with C.E.O.
13. Also requires a permit under Mineral Extraction Ordinance
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to
38 MLR.S.A, section 480-C, if the activity occurs in, on, over, or adjacent to any freshwater or coastal wetland, great pond, river, steam, or brook and
operates in such a manner that material or soil may be washed into them:
A, Dredging, bulldozing, removing or displacing soil, sand, vegetation, or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
16
Section 15. Land Use Standards
All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
A. Minimum Lot Standards
Minimum Lot Area Minimum Shore
(sq. ft.) Frontage (ft.)
(1)
(a) Residential per dwelling unit
{i} Within the Shoreland 30,000 150
Zone Adjacent to Tidal Areas
(ii) Within the Shoreland Zone 40,000 200
Adjacent to Non-Tidal Areas
(b) Governmental, Institutional, Commercial, or Industrial per principle structure
(i) Within the Shoreland Zone 40,000 200
Adjacent to Tidal Areas,
Exclusive of Those Areas
Zoned for Commercial
Fisheries and Maritime
Activities
{ii) Within the Shoreland Zone NONE NONE
Adjacent to Tidal Areas Zoned
for Commercial Fisheries.and
Maritime Activities
(iii) Within the Shoreland Zone 60,000 300
Adjacent to Non-Tidal Areas
(c) Public and Private Recreational Facilities
. (i) Within the Shoreland Zone 40,000 200
Adjacent to Tidal and Non-
Tidal Areas
(2) Land below the normal high-water line of a water body or upland edge of a wetland and
land beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
17
{3) Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on
both sides thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed area.
{5) If more than one residential dwelling unit, principal governmental, institutional,
commercial, or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each additional
dwelling unit, principal structure, or use.
(6) The Town may consider clustered housing units within the shoreland zone provided that
the overall dimensional requirements, including frontage and lot area per dwelling unit, are
met. When determining whether dimensional requirements are met, only land area within
the shoreland zone shall be considered.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high water line of great ponds, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary streams, or
the upland edge of a wetland, and in the Commercial Fisheries/Maritime Activities District there
shall be no minimum setback. In the Resource Protection District the setback requirement shall
be 250 feet, horizontal distance, except for structures, roads, parking spaces, or other regulated
objects specifically allowed in that district in which case the setback requirements specified
above shall apply.
In addition:
(a} The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks, and retaining walls, nor to other functionally water-
dependent uses.
(b) For principal structures, water and wetland setback measurements shall be taken from
the top of a coastal bluff that has been identified on Coastal Bluff maps as being "highly
unstable" or "unstable" by the Maine Geological Survey pursuant to its "Classification
of Coastal Bluffs" and published on the most recent Coastal Bluff map. If the applicant
and the permitting official(s) are in disagreement as to the specific location of a "highly
unstable" or "unstable" bluff, or where the top of the bluff is located, the applicant may
18
at his or her expense employ a Maine Registered Professional Engineer, a Maine
Certified Soil Scientist, a Maine State Geologist, or other qualified individual acceptable
to the permitting official(s) to make a determination. If agreement is still not reached,
the applicant may appeal the matter to the Board of Appeals.
(c) On anon-conforming lot of record on which only a residential structure exists, and it is
not possible to place an accessory structure meeting the required water body, tributary
stream, or wetland setbacks, the Code Enforcement Officer may issue a permit to place a
single accessory structure, with no utilities, for the storage of yard tools and similar
equipment. Such accessory structure shall not exceed eighty (80) square feet in area or
eight (8) feet in height, and shall be located as far from the shoreline or tributary stream
as practical and shall meet all other applicable standards, including lot coverage and
vegetation clearing limitations. In no case shall the structure be located closer to the
shoreline or tributary stream than the principal structure.
NOTE: All tidal land which is subject to tidal action during the highest annual tide is
coastal wetland.
NOTE: The Planning Board may increase the required setback of any proposed structure as
a condition of permit approval, if necessary, to accomplish the purposes of this Ordinance.
Instances where a greater setback may be appropriate include, but are not limited to: areas
of steep slope, shallow or erodible soils, or where an adequate vegetative buffer does not
exist.
NOTE: A tributary stream may be perennial or intermittent. Where a tributary stream is
present within the shoreland zone, setback standards from that tributary stream at its
highest intermittent level are applicable.
(2) Principal or accessory structures and expansions of existing structures which are
permitted in the Resource Protection, Limited Residential, Limited Commercial, and
Stream Protection Districts, shall not exceed thirty-five (35) feet in height. This
provision shall not apply to structures such as transmission towers, windmills, antennas,
and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one (1) foot above the elevation of the 100-year flood, the flood of
record, or in the absence of these, the flood as defined by soil types. Accessory structures may
be placed in accordance with the standards of the Town of Stockton Springs Floodplain
Ordinance and need not meet the elevation requirements of this paragraph.
(4) The total footprint area of all structures, parking lots, and other non-vegetated surfaces within
the shoreland zone shall not exceed twenty (20) percent of the lot or a portion thereof located
19
within the shoreland zone, including land area previously developed and in the Commercial
Fisheries/Maritime Activities District, where lot coverage shall not exceed seventy (70) percent.
For the purposes of calculating lot coverage, non-vegetated su rfaces include, but are not
limited to the following: structures, parking areas, and other areas from which vegetation has
been removed. Naturally occurring ledge and rock outcroppings are not counted as
nonvegetated surfaces when calculating lot coverage for lots of record on March 24, 1990 in
continuous existence since that date.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is (are) at least twenty-five (25) feet, horizontal distance, from the normal
high-water line of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d) The total height of the wall(s), in the aggregate, is no more than twenty-four (24)
inches;
({e) Retaining walls are located outside of the 100-year floodplain on streams,
coastal wetlands, and tributary streams, as designated on the Federal Emergency
Management Agency's (FEMA's) Flood Insurance Rate Maps or Flood Hazard
Boundary Maps, or the flood of record, or in the absence of these, by soil types
identified as recent floodplain soils;
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
hereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation.
Where natural ground cover is lacking, the area must be supplemented with leaf or
bark mulch;
20
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide
or effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of fifteen (15) feet, horizontal distance, is required,
measured perpendicularly to the normal high-water line or upland edge of a
wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2}{a) may traverse the
buffer.
NOTE: If the wall and associated soil disturbance occurs within 75 feet horizontal distance
of a water body, tributary stream, or coastal wetland, a permit pursuant to the Natural
Resource Protection Act is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in
areas of steep slopes or unstable soils provided; that the structure is limited to a maximum
of four (4) feet in width; that the structure does not extend below or over the normal high-
water line of a water body or upland edge of a wetland (unless permitted by the Department
of Environmental Protection pursuant to the Natural Resources Protection Act, 38
M.R.S.A., section 480-C); and that the applicant demonstrates that no reasonable access
alternative exists on the property.
(7) New buildings shall be set back at least 10 feet from a property line.
C. Piers, Docks, Wharves, Bridges and Other Structures and uses Extending over or Below the
Normal High-Water Line of a Water Body or Within a Wetiand ,and Shoreland Stabilization.
1. No more than one pier, dock, wharf or similar structure extending or located below the normal
high-water line of a water body or within a wetland is allowed on a single lot; except that when a
single lot contains at least twice the minimum shore frontage as specified in Section 15(A), a
second structure may be allowed and remain as long as the lot is not further divided.
2. Access from shore shall be developed on soils appropriate for such use and constructed so
as to control erosion.
3. The location shall not interfere with existing developed or natural beach areas.
4. The facility shall be located so as to minimize adverse effects on fisheries.
21
5. The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock, or
wharf in non-tidal waters shall not be wider than six (6) feet for non-commercial uses.
6. No new structure shall be built on, over, or abutting a pier, wharf, dock, or other structure
extending below the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
7. New permanent piers and docks on non-tidal waters shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit
has been obtained from the Department of Environmental Protection, pursuant to the Natural
Resources Protection Act.
8. No existing structures built on, over, or abutting a pier, dock, wharf, or other structure
extending below the normal high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any district.
9. Except in the Commercial Fisheries/Maritime Activities District, structures built on, over, or
abutting a pier, wharf, dock, or other structure extending below the normal high-water line of a
water body or within a wetland shall not exceed twenty (20) feet in height above the pier,
wharf, dock, or other structure.
10. Vegetation may be removed in excess of the standards in Section 15(P) of this ordinance in order
to conduct shoreline stabilization of an eroding shoreline, provided that a permit is obtained
from the Planning Board. Construction equipment must access the shoreline by barge when
feasible as determined by the Planning Board.
a. When necessary, the removal of tress and other vegetation to allow for construction
equipment access to the stabilization site via land must be limited to no more than 12
feet in width. When the stabilization project is complete the construction equipment
access way must be restored..
b. Revegetation must occur in accordance with Section 15(S).
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site.
(2) The areas intended for placement of a recreational vehicle, tent, or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet horizontal distance
from the normal high-water line of a great pond, and seventy-five (75) feet horizontal distance
22
from the normal high-water line of other water bodies, tributary streams, or the upland edge of
a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds are
allowed provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be permitted.
(2)When an individual private campsite is proposed on a lot that contains another principal use
and/or structure, the lot must contain the minimum lot dimensional requirements for the
principal structure and/or use, and the individual private campsite separately.
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet horizontal distance from the normal high-
water line of a great pond, and seventy-five (75) feet horizontal distance from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. Recreational vehicles shall
not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent, or similar shelter in
a Resource Protection District shall be limited to one thousand (1,000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or
land owner is required.
(7) When a recreational vehicle, tent, or similar shelter is placed on-site for more than one
hundred twenty (120) days per year, all requirements for residential structures shall be met,
including the installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds and streams which flow to great
ponds: ;
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
23
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides, or fertilizers other than amounts
normally associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10) Petroleum or petroleum product storage and/or sale except storage on same property as use
occurs and except for storage and sales associated with marinas
(11) Photographic processing
(12) Printing
G. Parking Areas.
{1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located, except that in the Commercial
Fisheries/Maritime Activities District parking areas shall be set back at least twenty-five
(25) feet horizontal distance from the shoreline. The setback requirement for parking areas
serving public boat launching facilities in Districts other than the General Development |
District and Commercial Fisheries/Maritime Activities Districts shalt be no less than fifty
(50) feet horizontal distance from the shoreline or tributary stream if the Planning Board
finds that no other reasonable alternative exists further from the shoreline or tributary
stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent storm water runoff from flowing directly into a water body, tributary stream, or
wetland, and, where feasible, to retain all runoff on-site.
{3) In determining the appropriate size of proposed parking facilities, the following shall
apply:
(a) Typical parking space: approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
24
(b) Internal travel aisles: approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts, and other related features.
(1) Roads and driveways shall be set back at least one hundred (100) feet horizontal distance from
the normal high water line of a great pond, and seventy five (75) feet horizontal distance from
the normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland unless no reasonable alternative exists as determined by the Planning Board. If no
other reasonable alternative exists, the road and/or driveway setback requirement shall be no
less than fifty (50) feet horizontal distance upon clear showing by the applicant that the
appropriate techniques will be used to prevent sedimentation of the water body, tributary
stream, or wetland. Such techniques may include, but are not limited to the installation of
settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed
s0 as to avoid sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent, the road and/or driveway setback shall be increased
by ten (10) feet horizontal distance for each five (5) percent increase in slope above twenty
(20) percent.
Section 15(H)(1) does not apply to approaches to water crossings or to roads or driveways that
provide access to permitted structures and facilities located nearer to the shoreline or tributary
stream due to an operational necessity, excluding temporary docks for recreational uses. Roads
and driveways providing access to permitted structures within the setback area shall comply
fully with the requirements of Section 15(H)(1) except for that portion of the road or driveway
necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of
their setback from a water body, tributary stream, or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the
Planning Board in a Resource Protection District, upon a finding that no reasonable
alternative route or location is available outside the district. When a road or driveway is
permitted in a Resource Protection District, the road and/or driveway shall be set back as far
as practicable from the normal high-water line of a water body, tributary stream, or upland
edge of a wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion
and sedimentation control contained in Section 15(T).
25
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads, and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
{7) Ditch relief (cross drainage) culverts, drainage dips, and water turnouts shall be installed ina
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips, and associated water turnouts shall be spaced along
the road or driveway at intervals no greater than indicated in the following table:
Grade (percent) Spacing (feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45.
21+ 40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular
to the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow
for effective functioning and their inlet and outlet ends shall be stabilized with
appropriate materials.
(8) Ditches, culverts, bridges, dips, water turnouts, and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
26
I. Signs. The following provisions shall govern the use of signs in the Resource Protection,
Stream Protection, Limited Residential, and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. In the Limited Commercial District, however, such signs shall not exceed sixteen
(16) square feet in area. Signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground. |
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff. The Storm water Management Law (38 M.R.S.A. section 420-D) requires a
full permit to be obtained from the DEP prior to construction of a project consisting of twenty
thousand (20,000) square feet or more of impervious area or five (5) acres or more of a
developed area in an urban impaired stream watershed or most-at-risk lake watershed or a
project with one (1) acre or more of developed area in any other stream, coastal, or wetland
watershed. A permit-by-rule is necessary for a project with one (1) acre or more of disturbed area
but less than one (1) acre impervious area (20,000 square feet for most-at-risk lakes and urban
impaired streams) and less than five (5) acres of developed area. Furthermore, a Maine
Construction General Permit is required if the construction will result in one (1) acre or more of
disturbed area.
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces, and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of storm waters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning. °
27
K. Waste Disposal. The Maine Subsurface Wastewater Disposal Rules require new systems,
excluding fill extensions, to be constructed no less than one hundred (100) horizontal feet from
the normal high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules and the following:
(a) clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions shall not extend closer than seventy-five (75) feet horizontal
distance from the normal high-water line of a water body or the upland edge of a
wetland and
(b) a holding tank is not allowed for a first-time residential use in the shoreland zone.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public
ways and existing service corridors.
(2} The installation of essential services, other than road-side distribution lines, is not allowed
in a Resource Protection or Stream Protection District, except to provide services to a
permitted use within said district, or except where the applicant demonstrates that no
reasonable alternative exists. Where allowed, such structures and facilities shall be located
so as to minimize any adverse impacts on surrounding uses and resources, including visual
impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers, and related
equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or
extent of | mineral resources shall be accomplished by hand sampling, test boring, or other
methods which create minimal disturbance of less than one hundred (100) square feet of ground
surface. A permit from the Planning Board shall be required for mineral exploration which exceeds
the above limitations. All excavations, including test pits and holes, shall be immediately capped,
filled, or secured by other equally effective measures to restore disturbed areas and to protect the
public health and safety.
Mineral extraction requires a permit under the Mineral Extraction Ordinance, before a permit for .
mineral extraction is granted, a Reclamation Plan shall be filed with and approved by the Planning
Board. Such a plan shall describe in detail procedures to be undertaken to fulfill the requirements
of Section 15(M).
28
(1) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet horizontal distance of the normal high-water line of a
great pond, and within seventy-five (75) feet horizontal distance of the normal high-water line
of any other water body, tributary stream, or the upland edge of a wetland. Extraction
operations shall not be permitted within fifty (50) feet horizontal distance of any property line
without written permission of the owner of such adjacent property.
(2) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred
(100) cubic yards of materials are removed in any consecutive twelve (12) month period,
ground levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
(b) The disposal of any and all materials on-site must comply with all the provisions of the State
of Maine Solid Waste Laws, 38 M.R.S.A. section 1301 and the solid waste management
rules, Chapters 400-419 of the Department of Environmental Protection's regulations.
(c) The final graded slope shall be two-and-one-half to one (2:/2:1) slope or flatter.
(d) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(3) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading or disposal of manure shall be accomplished in conformance with the
Manure Utilization Guidelines published by the former Maine Department of Agriculture on
November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet horizontal distance ofa
great pond, or within seventy-five (75) feet horizontal distance of other water bodies, tributary
streams, or wetlands. All manure storage areas within the shoreland zone must be constructed
or modified such that the facility produces no discharge of effluent or contaminated storm
water.
29
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered a violation of this Ordinance.
(4) There shall be no new tilling of soil within one hundred (100) feet horizontal distance of the
normal high-water line of a great pond; within seventy-five (75) feet horizontal distance from
other water bodies and costal wetlands; nor within twenty-five (25) feet horizontal distance of
tributary streams and freshwater wetlands. Operations in existence on the effective date of
this ordinance and not in conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100) feet
horizontal distance of the normal high-water line of a great pond; within seventy-five (75) feet
horizontal distance of other water bodies and coastal wetlands, nor within twenty-five (25) feet
horizontal distance of tributary streams and freshwater wetlands. Livestock grazing associated
with ongoing farm activities and which are not in conformance with the above setback
provisions may continue, provided that such grazing is conducted in accordance with a
Conservation Plan that has been filed with the Planning Board.
O. Repealed
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) in a Resource Protection District abutting a great pond, there shall be no cutting of vegetation
within the strip of land extending seventy five (75) feet horizontal distance inland from the normal
high-water line, except to remove hazard trees as described in Section Q..
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be limited
to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1) within a strip of land extending one hundred (100)
feet, horizontal distance inland from the normal high water line of a great pond, or within a
strip extending seventy five (75) feet horizontal distance from any other water body, tributary
stream, or the upland edge of a wetland, a buffer strip of vegetation shall be preserved as
follows:
(a) There shall be no cleared opening greater than two hundred fifty (250) square feet in the
forest canopy (or other existing woody vegetation if a forested canopy is not present) as
measured from the outer limits of the tree or shrub crown. However, a single footpath not
to exceed six (6) feet in width as measured between tree trunks and/or shrub items is
allowed for accessing the shoreline provided that a cleared line of sight to the water
through the buffer strip is not created.
30
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-distributed
stand of trees and other vegetation is maintained. For the purposes of this section a "well-
distributed stand of trees" adjacent to a great pond shall be defined as maintaining a rating
score of twenty four (24) or more in each twenty five (25)-foot by fifty (50) rectangular
1,250 square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above Ground Level (inches) Points
2-<4in. 1
4-<8 in. 2
8 - <12 in 4
12 in. or greater 8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of sixteen (16) per twenty five
(25)-foot by 50-foot rectangular area.
Note: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains four (4)
trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in diameter,
and three trees between 8 and 12 inches in diameter, and two trees over 12 inches in
diameter, the rating score is:
(4x1) + (2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12 points
(36-24=12) may be removed from the plot provided that no cleared openings are created.
The following shall govern in applying this point system:
i. The 25-foot by 50 foot rectangular plots must be established where the landowner
or lessee proposes clearing within the required buffer;
ii. Each successive plot must be adjacent to, but not overlap a previous plot;
iii. Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
iv. Any plot containing the required points may have vegetation removed down to the
minimum points required or as otherwise allowed by this Ordinance.
v. Where conditions permit, no more than fifty percent (50%) of the points on any
25-foot by 50 foot rectangular area may consist of trees greater than twelve (12)
inches in diameter.
31
For the purposes of Section 15(P) (2) (b) "other natural vegetation" is defined as
retaining existing vegetation under three (3) feet in height and other ground cover and
retaining at least five (5) saplings less than two (2) inches in diameter at four and one
half (4-1/2) feet above ground level for each 25-foot by 50-foot rectangular area. If five
saplings do not exist, no woody stems less than two (2) inches in diameter can be
removed until five (5) saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than forty percent (40%) of the total
volume of trees four (4) inches or more in diameter, measured at 4-1/2 feet above
ground level, may be removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat,-existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and shall not be removed, except
to provide for a footpath or other permitted uses as described in paragraphs (2) and (2){a)
above.
(d) Pruning of tree branches on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, dead
or hazard trees results in the creation of cleared openings, these openings shall be
replanted with native tree species in accordance with Section Q below, unless existing new
tree growth is present.
f. In order to maintain a buffer strip of vegetation, clearing or vegetation removal for permitted
construction activities within or beyond the buffer strip must comply with the requirements
of Section 15(P){2). Note: In some cases, construction limitations may result in a new
structure being located further from the shoreline than the minimum setback requirements.
(3) At distances greater than one hundred (100) feet, horizontal distance from a great pond , and
seventy five (75) feet horizontal distance from the normal high-water line of any other water
body, tributary stream, or the upland edge of a wetland, there shall be allowed on any lot, in
any ten (10) year period, selective cutting of not more than forty (40) percent of the volume of
trees four (4) inches or more in diameter, measured 4-1/2 feet above ground level. Tree
removal in conjunction with the development of permitted uses shall be included in the forty
(40) percent calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
in no event shall cleared openings for any purpose, including but not limited to principal and
accessory structures, driveways, lawns, and sewage disposal areas, exceed in the aggregate,
twenty five percent (25%) of the lot area within the shoreland zone or ten thousand (10,000)
square feet, whichever is greater, including land previously cleared . This provision shall not
apply to the Commercial Fisheries/Maritime Activities Districts.
32
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be enlarged,
except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15({P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
1. Hazard trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
a. Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in
the tree canopy greater than two hundred and fifty (250) square feet, replacement with
native tree species is required, unless there is new tree growth already present. New tree
growth must be as near as practicable to where the hazard tree was removed and be at
least two (2) inches in diameter, measured at four and one half (4.5) feet above the
ground level. If new growth is not present, then replacement trees shall consist of native
species and be at least four (4) feet in height, and be no less than two (2) inches in
diameter. Stumps may not be removed.
b. Outside of the shoreline buffer, when the removal of hazard tress exceed forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four and
one half (4.5) feet above ground level in any ten year period, and/or results in cleared
openings exceeding twenty-five (25) percent of the lot area within the shoreland zone, or
ten thousand (10,000) square feet, whichever is greater, replacement with native tree
species is required, unless there is new tree growth already present. New tree growth
must be as near as practicable to where the hazard tree was removed and be at least two
, (2) inches in diameter, measured at four and one half (4.5) above the ground level. If new
growth is not present, then trees shall consist of native species and be at least two (2)
inches in diameter, measured at four and one half (4.5) above the ground level.
c. The removal of standing dead trees, resulting from natural causes, is permissible without
the need for replanting or a permit, as long as the removal does not result in the creation
of new lawn areas, or other permanently clear areas, and stumps are not removed. For
purposes of this provision dead trees are those trees that contain no foliage during the
growing season.
d. The Code Enforcement Officer may require the property owner to submit an evaluation
from a licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
33
e. The Code Enforcement Officer may require more than a one-for-one replacement for
hazard tress removed that exceed eight (8) inches in diameter at four and one half (4.5)
feet above ground level.
2. Storm-damaged trees in the shoreland zone may be removed without a permit after consultation
with the Code Enforcement Officer if the following requirements are met:
a. Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared
opening in the tree canopy greater than two hundred and fifty (250) square feet, »
replanting is not required, but the area shall be required to naturally revegetate, and the
following requirements must be met:
i. The area from which a storm-damaged tree is removed does not result in new
lawn areas, or other permanently cleared areas;
ii. Stumps from the storm-damaged tress may not be removed;
iii. Limbs damaged from a storm event may be pruned even if they extend beyond
the bottom one-third (1/3) of the tree; and
iv. If after one growing season, no natural regeneration or regrowth is present,
replanting of native seedlings or saplings is required at a density of one seedling per
every eighty (80) square feet of lost canopy.
b. Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of the
volume of trees four (4) inches or more in diameter, measured at four and one half (4.5)
above the ground level in any ten (10) year period, or results, in the aggregate, in cleared
openings exceeding 25% of the lot area within the shoreland zone or ten thousand
(10,000) square feet, whichever is greater, and no natural regeneration occurs within one
growing season, then native tree seedlings or saplings shall be replanted on a one-for-one
basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in
Section 15(P), provided that all other applicable requirements of this chapter are complied with, and
the removal of vegetation is limited to which is necessary:
1. The removal of vegetation that occurs at least once every two (2) years for the maintenance of
legally existing areas that do not comply with the vegetation standards in this chapter, such as
but not limited to cleared openings in the canopy or fields. Such areas shall not be enlarged,
except as allowed by this section. If any or these areas, due to lack of removal of vegetation
every two (2) years, reverts back to primary woody vegetation, the requirements of Section
15(P) apply;
34
2. The removal of vegetation from the location of allowed structures or allowed uses, when the
shoreland setback requirements of Section 15 (B) are not applicable;
3. The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
4. The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of Section 15(N) are
complied with;
5. The removal of vegetation associated with brownfields or voluntary response action program
(VRAP) projects provided that the removal of vegetation is necessary for remediation activities
to clean-up contamination on a site in a general development district, commercial fisheries and
maritime activities district or other equivalent zoning district approved by the Commissioner
that is part of a state of federal brownfields program or a voluntary response action program
pursuant 38 M.R.S.A Section 343-E, and that is located along:
a. A coastal wetland; or
b. A river that does not flow to a great pond classified as GPA pursuant to 38 M.R.S.A. Section
465-A.
6. The removal of non-native invasive vegetation species provided the following minimum
requirements are met;
a. If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled or
tracked motorized equipment is operated and stored at least twenty-five (25) feet, horizontal
distance, from the shoreline, except that wheeled or tracked equipment may be operated or
stored on existing structural surfaces, such as pavement or gravel;
b. Removal of vegetation within twenty-five (25) feet, horizontal distance, from the shoreline
occurs via hand tools; and
c. If applicable clearing and vegetation removal standards are exceeded due to the removal of
non-native invasive species vegetation, the area shall be revegetated with native species to
achieve compliance.
7. The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and their agents.
35
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in
Section 15(P), to address the removal of non-native invasive species of vegetation, or as a
mechanism to allow for development that may otherwise not be permissible due to the vegetation
standards, including removal of vegetation in conjunction with a shoreline stabilization project, the
revegetation must comply with the following requirements:
1. The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional that describes revegetation activities and maintenance. The plan must include a
scaled site plan, depicting where vegetation was, or is to be removed, where existing
vegetation is to remain, and where vegetation is to be planted, including a list of all vegetation
to be planted.
2. Revegetation must occur along same segment of shoreline and in the same area where
vegetation was removed and at a density comparable to the pre-existing vegetation, except
where a shoreline stabilization activity does not allow revegetation to occur in the same area
and at a density comparable to the pre-existing vegetation, in which case revegetation must
occur along same segment of shoreline and as close as possible to area where vegetation was
removed.
3. If part of a permitted activity, revegetation shall occur before the expiration of the permit. If
the activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
4, Revegetation activities must meet the following requirements for trees and saplings:
a. All trees and sapling removed must be replaced with native non-invasive species;
b. Replacement vegetation must at a minimum consist of saplings;
c. If more than three (3) trees or saplings are planted, then at least three (3) different species
shall be used;
d. No one species shall make up 50% or more of the number of trees and saplings planted;
e. If revegetation is required for a shoreline stabilization project, and it is not possible to plant
trees and saplings in the same area where trees or saplings were removed, then trees or
saplings must be planted in a location that effectively reestablishes the screening between
the shoreline and structures; and
f. A survival rate of a least eighty (80) percent of planted trees or saplings is required for a
minimum five (5) year period.
36
5. Revegetation activities must meet the following requirements for woody vegetation and other
vegetation under three (3) feet in height:
a. All woody vegetation and vegetation under three (3) feet in height must be replaced with
native non-invasive species of woody vegetation and vegetation under three (3) feet in height
as applicable;
b. Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantiles and variety sufficient to prevent erosion and provide for effective infiltration of
stormwater;
c. If more than three (3) woody vegetation plants are to be planted, then at least three (3)
different species shall be planted;
d. No one species shall make up 50% or more of the number of planted woody vegetation
plants; and
e. Survival of planted woody vegetation and vegetation under three feet in height must be
sufficient to remain in compliance with the standards contained within this chapter for
minimum of five (5) years.
6. Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
a. All ground vegetation and ground cover removed must be replaced with native herbaceous
vegetation, in quantities and variety sufficient to prevent erosion and provide for effective
infiltration of stormwater;
b. Where necessary due to lack of sufficient ground cover, an area must be supplemented
with a minimum four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion and
provide for effective infiltration of stormwater; and
c. Survival and functionality of ground vegetation and ground cover must be sufficient to
remain in compliance with standards contained within this chapter for minimum of five (5)
years.
37
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation, or other similar activities which result in
unstabilized soil conditions and which require a permit shall also require a written soil erosion
and sedimentation control plan. The plan shail be submitted to the permitting authority for
approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing, or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or riprap.
(2) In order to create the least potential for erosion, development shall be designed to fit with
the topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance, and shall be in operation during all stages of the activity.
The amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1)
week from the time it was last actively worked, by use of riprap, sod, seed and mulch, or
other effective measures. In all cases permanent stabilization shall occur within nine (9)
. months of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five
hundred (500) square feet and shall be maintained until a catch of vegetation is
established.
(b) Anchoring the mulch with netting, peg and twine, or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into
the water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage and drainage outlets shall be protected from erosion from .
water flowing through them. Drainage ways shall be designed and constructed in order to
carry water from a twenty five (25)-year storm or greater, and shall be stabilized with
_ vegetation or lined with riprap.
38
U. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal and commercial or industrial
development and other similar intensive land uses shall require a soils report based on an on-site
investigation and be prepared by state-certified professionals. Certified persons may include Maine
Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified Geologists,
and other persons with training and experience in the recognition and evaluation of soil properties.
The report shall be based upon the analysis of the characteristics of the soil and surrounding land
and water areas, maximum groundwater elevation, presence of ledge, drainage conditions, and
other pertinent data which the evaluator deems appropriate. The soils report shall include
recommendations for a proposed use to counteract soil limitations where they exist.
V. Water Quality
No activity shall deposit on or into the ground or discharge into the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream, or wetland.
W. Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on or adjacent
to sites listed on (or eligible to be listed on) the National Register of Historic Places, as determined
by the permitting authority, shall be submitted by the applicant to the Maine Historic Preservation
Commission for review and comment at least twenty (20) days prior to action being taken by the
permitting authority. The permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
Section 16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer and Assistant(s)
A Code Enforcement Officer (CEO) and one (1) or more Assistant Code Enforcement
Officers, where appropriate, shall be appointed by the Selectmen annually by July 1.
(2) Planning Board
A Planning Board shall be created in accordance with State law.
39
(3) Board of Appeals
A Board of Appeals shall be created pursuant to the provisions of 30-A M.R.S.A. Section
2691.
B. Permitting
(1) Permit Requirements for Land Use and Structures
After the effective date of this Ordinance; no person shall, without first obtaining a permit:
(a) Engage in any activity or use of land or structure that requires a permit in the district in
which such activity or land use would occur;
(b) Expand, change, or replace an existing use or structure;
{c) Renew a discontinued non-conforming use.
A person who is issued a permit pursuant to this Ordinance shall have a copy of the permit
on site while the work authorized by the permit is performed.
{2) Permit Requirements for Existing Road Culverts
A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than twenty five percent (25%) longer than the culvert
being replaced;
(b) The replacement culvert is not longer than seventy five (75) feet; and
(c) Adequate erosion contro! measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the water course.
(3) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
(4) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in section
14.
40
(2) All applications shall be signed by an owner or individual who can show evidence of right, title,
or interest in the property or by an agent, representative, tenant, or contractor of the owner
with authorization from the owner to apply for a permit hereunder, certifying that the
information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
(5) Application fees in the Shoreland Zone shall be the same as for activities elsewhere in
Stockton Springs, as established by the current Zoning Ordinance for the Town of Stockton
Springs, Maine (Section VI! (C)).
D. Procedure for Administering Permits
Within thirty five (35) days of the date of receiving written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that the
application is a complete application or, if the application is incomplete, that specified additional
material is needed to make the application complete. The Planning Board or the Code Enforcement
Officer, as appropriate, shall approve, approve with conditions, or deny all permit applications in
writing within thirty five (35) days of receiving a completed application. However, if the Planning
Board has a waiting list of applications, a decision on the application shall occur within thirty five
(35) days after the first available date on the Planning Board's agenda following receipt of the
completed application, or within thirty five (35) days of the public hearing, if the proposed use or
structure is found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in conformity
with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
Al
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird, or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland and
coastal waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan; |
(7) Will not adversely affect existing commercial fishing or maritime activities in a
Commercial Fisheries/Maritime Activities district;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local ordinance
or regulation or statute administered by the municipality.
E. Special Exceptions
In addition to the criteria specified in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential structure
in a Resource Protection District provided that the applicant demonstrates that all of the following
conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection |
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and
recorded in the registry of deeds of the county in which the lot is located before the
adoption of the Resource Protection District.
(3) All proposed buildings, sewage disposal systems, and other
improvements are:
(a) Located on natural ground slopes of less than twenty percent (20%); and
(b) Located outside the velocity zone in areas subject to tides, based on detailed flood
insurance studies and as delineated on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps; all buildings, including
basements, are elevated at least one (1) foot above the one hundred (100)-year floodplain
elevation; and the development is otherwise in compliance with any applicable municipal
42
floodplain ordinance. If the floodway is not shown on the Federal Emergency Management
Agency Maps, it is deemed to be one half (1/2) the width of the one hundred (100)-year
floodplain.
(4) The total footprint, including cantilevered or similar overhanging extensions, of all principal and
accessory structures is limited to a maximum of one thousand five hundred (1,500) square feet.
This limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream, or upland edge of a wetland to the greatest
practical extent, but not less than seventy five (75) feet horizontal distance. In determining the
greatest practical extent, the Planning Board shall consider the depth of the lot, the slope of
the land, the potential for soil erosion, the type and amount of vegetation to be removed, the
proposed building site's elevation in regard to the floodplain, and its proximity to moderate-
value and high-value wetlands.
F. Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made within
one year of the issuance of the permit, the applicant shall have one additional year to complete the
project, at which time the permit shall expire.
G. Installation of Public Utility Service .
No public utility, water district, sanitary district, or any utility company of any kind may install
services to any new structure located in the Shoreland Zone unless written authorization attesting
to the validity and currency of all local permits required under this or any previous Ordinance has
been issued by the appropriate municipal officials. Following installation of service, the company or
district shall forward the written authorization to the municipal officials, indicating that the
installation has been completed.
H. Appeals
(1) Powers and Duties of the board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals on an appellate basis
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a "de
novo" basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision, or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application under this
43
Ordinance. Any order, requirement, decision, or determination made, or failure to act, in
the enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth
in this Ordinance.
(2) Variance Appeals: Variances may be granted only under the following
conditions:
(a) Variances may be granted only from dimensional requirements including but not
limited to lot width, structure height, percentage of lot coverage, and setback
requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by
this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
i. The proposed structure or use would meet the provisions of Section 15 except for
the specific provision which has created the non-conformity and from which relief
is sought; and
ii The strict application of the terms of this Ordinance would result in undue
hardship. The term "undue hardship" shall mean:
1. That the land in question cannot yield a reasonable return unless a variance is
granted;
2. That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
3, That the granting of a variance will not alter the essential character of the
locality; and
4. That the hardship is not the result of action taken by the applicant or a prior
owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, The Board of Appeals may grant a variance
to an owner of a residential dwelling for the purpose of making that dwelling accessible to a
person with a disability who resides in or regularly uses the dwelling. The Board shall restrict
any variance granted under this subsection solely to the installation of equipment or the
construction of structures necessary for access or egress from the dwelling by the person
with the disability. The Board may impose conditions on the variance, including limiting the
variance to the duration of the disability or to the time that the person with the disability
44
lives in the dwelling. The term "structures necessary for access to or egress from the
dwelling" shall include railing, wall, or roof systems necessary for the safety or effectiveness
of the structure. Any permit issued pursuant to this subsection is subject to Sections
16(H)(2){f) and 16 (H)(4)(b){iv) below.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order
to insure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the Commissioner
of the Department of Environmental Protection at least twenty (20) days prior to action by
the Board of Appeals. Any comments received from the Commissioner prior to the action
by the Board of Appeals shall be made part of the record and shall be taken into
consideration by the Board of Appeals.
(3) Administrative Appeals: When the Board of Appeals reviews a decision of the Code
Enforcement Officer the Board of Appeals shall hold a "de novo" hearing. At this time the
Board may receive and consider new evidence and testimony, be it oral or written. When
acting in a "de novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its own
decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an
appellate hearing, and may reverse the decision of the Planning Board only upon finding
that the decision was contrary to specific provisions of the Ordinance or contrary to the
facts presented to the Planning Board. The Board of Appeals may only review the record of
the proceedings before the Planning Board. The Board of Appeals shall not receive or
consider any evidence which was not presented to the Planning Board, but the Board of
Appeals may receive and consider written or oral arguments. If the Board of Appeals
determines that the records of the Planning Board proceedings are inadequate, the Board of
Appeals may remand the matter to the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
i An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)}{1)(a)
~ above. Such appeal shall be taken within thirty (30) days of the date of the official,
45
written decision appealed from, and not otherwise, except that the Board, upon
showing of good cause, may waive the thirty (30)-day requirement.
ii Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
1. Aconcise written statement indicating what relief is requested and why the
appeal or variance should be granted.
2. Asketch drawn to scale showing lot lines, location of existing buildings, and
structures and other physical features of the lot pertinent to the relief sought.
iii Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
iv. The Board of Appeals shall hold a public hearing on an administrative appeal or
variance within thirty five (35) days of its receipt of a complete written application,
unless this time period is extended by the parties.
(b) Decision by Board of Appeals
i Amajority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
ii. The person filing the appeal shall have the burden of proof.
iii. The Board shall decide all administrative and variance_appeals within thirty-five
(35) days after the close of the hearing and shall issue a written decision on all
appeals.
iv. The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and the conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7) days
of the Board's decision. Copies of written decisions of the Board of Appeals shall
be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
(4) Appeal to Superior Court: Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of
46
Appeals may take an appeal to Superior Court in accordance with State laws within forty- five
(45) days from the date of any decision of the Board of Appeals.
(5) Reconsideration: In accordance with 30-A M.R.S.A. section 2691(3)(F}, the Board of
Appeals may reconsider any decision within forty-five (45) days of its prior
decision. A request to the Board to reconsider a decision must be filed within ten (10) days
of the decision that is being reconsidered. A vote to reconsider and the action taken on that
reconsideration must occur and be completed within forty-five (45) days of the date of the
vote on the original decision. Reconsideration of a decision shall require a positive vote of
the majority of the Board members originally voting on the decision, and the proper
notification to the landowner, petitioner, Planning Board, Code Enforcement Officer, and
other parties of interest, including abutters and those who testified at the original
hearing(s).The Board may conduct additional hearings and receive additional evidence and
testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
47
I. Enforcement
(1) Nuisances
Any violation of this ordinance shall be deemed to be a nuisance.
(2} Code Enforcement Officer
{a) It shall be the duty of the Code Enforcement Officer (CEO) to enforce the provisions of this
Ordinance. If the CEO shall find that any provision of this Ordinance is being violated, he or
she shall notify in writing the person responsible for the violation and ordering the action
necessary to correct it, including the discontinuance of illegal buildings or structures, and
abatement of nuisance conditions. A copy of such notices shall be submitted to the
municipal officers and be maintained as a permanent record.
(b) The CEO shall conduct on-site inspections to ensure compliance with all
applicable laws and conditions attached to permit approvals. The Code
Enforcement Officer shall also investigate all complaints of alleged violations
of this Ordinance.
(c) The CEO shall keep a complete record of all essential transactions of the
office, including applications submitted, permits granted or denied, variances
granted or denied, revocation actions, revocation of permits, appeals, court
actions, violations investigated, violations found, and fees collected
(3) Legal Actions. When the action does not result in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon notice from the CEO, are hereby directed to
institute any and all actions and proceedings, either legal or equitable, including seeking
injunctions of violations and the imposition of fines, that may be appropriate or necessary to
enforce the provisions of this Ordinance in the name of the municipality. The municipal officers,
or their authorized agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this Ordinance and recovering fines
without Court action. Such agreements shall not allow an illegal structure or use to continue
unless there is clear and convincing evidence that the illegal structure or use was constructed as
a direct result of erroneous advice given by an authorized municipal officer and there is no
evidence that the owner acted in bad faith, or unless the removal of the structure or use will
result in a threat or hazard to public health and safety or will result in substantial environmental
damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent, ora
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30A, M.R.S.A. subsection 4452.
48
Section 17. Definitions
Accessory structure or use -- use or structure which is incidental and subordinate to the principal use or
structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A deck or
similar extension of the principal structure or a garage attached to the principal structure by a roof or
common wall is considered part of the principal structure.
Aggrieved party -- an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person who land abuts land for which a permit or
variance has been granted; or any other persons who have suffered particularized injury as a result of
the granting or denial of such permit or variance. .
Agriculture -- the production, keeping, or maintenance for sale or lease, of plants or animals, including,
but not limited to, forages and sod crops, grains and seed crops, dairy animals and dairy products;
poultry and poultry products, livestock, fruits and vegetables, and ornamental green house products.
Agriculture does not include forest management and timber harvesting activities.
Aquaculture -- the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area -- the area of cross-section of a tree stem at 4-1/2 feet above ground level and inclusive of
bark.
Basement -- any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more
than 50% of its volume below the existing ground level.
Boat Launching Facility -- a facility designed primarily for the launching and landing of watercraft, and
which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry -- State of Maine Department of Agriculture, Conservation, Forestry, Bureau of
Forestry
Campground -- any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to, tents, recreational vehicles, or other shelters.
Canopy -- the more or less continuous cover formed by tree crowns in'a wooded area.
Coastal wetland -- all tidal and subtidal lands; all lands with vegetation present that is tolerant of salt
water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh, bog, beach, flat,
or contiguous low land that is subject to tidal action during the highest tide level for the year in which
any activity is proposed as identified by tide tables published by the National Ocean Service. Coastal
wetlands may include portions of coastal sand dunes.
49
Commercial use -- the use of lands, buildings, or structures, other than "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling of
goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Development -- a change in land use involving alteration of the land, water, or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements -- numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage, and height.
Disability -- any disability, infirmity, malformation, disfigurement, congenital defect, or mental condition
caused by bodily injury, accident, disease, birth defect, environmental conditions, or illness; and also
includes the physical or mental condition of a person which constitutes a substantial handicap as
determined by a physician or in the case of a mental handicap, by a psychiatrist or psychologist, as well
as any other health or sensory impairment which requires special education, vocational rehabilitation,
or related services.
Driveway -- a vehicular access-way less than five hundred (500) feet in length serving two single-family
dwellings or one two-family dwelling or less.
Emergency operations -- operations conducted by the public health, safety, or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement, and operations to rescue
human beings, property, and livestock from the threat of destruction or injury.
Essential services -- gas, electrical or communication facilities; steam, fuel, electric power, or water
transmission or distribution lines, towers, and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry, or similar pipelines; municipal sewage lines, collection or
supply systems; and associated storage tanks. Such systems may include towers, poles, wires, mains,
drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals, hydrants and similar
accessories, but shall not include service drops or buildings which are necessary for the furnishing of
such services.
Expansion of a structure -- an increase in the footprint of a structure, including all extensions such as but
not limited to: attached decks, garages, porches, and greenhouses.
Expansion of use -- the addition of one or more months to a use's operating season; or the use of more
footprint of a structure or ground area devoted to a particular use.
Family -- one or more persons occupying a premise and living as a single housekeeping unit.
Floodway -- the channel of a river or other watercourse and adjacent land areas that must be reserved in
order to discharge the 100-year flood without cumulatively increasing the water surface elevation by
more than one foot in height.
50
Floor area -- the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Forest wetland -- a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation -- the supporting substructure of a building or other structure, but excluding wooden sills
and post supports, but including basements, slabs, frostwalls, or other base consisting of concrete,
block, brick, or similar material.
Freshwater wetland -- freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Of ten (10) or more contiguous acres; or of less than ten (10) contiguous acres and
adjacent to a surface water body, excluding any river, stream or brook, such that in a natural
state, the combined surface area is in excess of ten (10) acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the
criteria of this definition.
Functionally water-dependent uses -- those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal and inland waters and which
cannot be located away from these waters. The uses include, but are not limited to, commercial and
recreational fishing and boating facilities, , finfish and shellfish processing, fish related storage and retail
and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat
building facilities, marinas, navigational aids, basins and channels, shoreline structures necessary for
erosion control , industrial uses dependent upon water-borne transportation or requiring _ large
volumes of cooling or processing water and which cannot reasonably be located or operated at an inland
site, and uses which primarily provide general public access to coastal or inland waters. Recreational
boat storage buildings are not considered to be a functionally water-dependent.
Great pond -- any inland body of water which in a natural state has a surface area in excess of ten (10)
acres, and any inland body of water artificially formed or increased which has a surface area in excess
of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or increased
inland body of water is completely surrounded by land held by a single owner.
Ground cover -- smal! plants, fallen leaves, needles and twigs, and partially decayed organic matter on
the forest floor.
Hazard tree -- a tree with a structural defect, combination of defects, or disease resulting in a structural
defect that under the normal range of environmental conditions at the site exhibits a high probability of
51
failure and loss of a major structural component of the tree in a manner that will strike a target. A
normal range of environmental conditions does not include meteorological anomalies, such as, but not
limited to: hurricanes; hurricane-force winds; tornados; microbursts; or significant ice storm events.
Hazard trees also include those trees that pose a serious and imminent rick to bank stability. A target is
the area where personal injury or property damage could occur if the tree or a portion of the tree fails.
Targets include roads, driveways, parking areas, structures, campsites, and any other developed area
where people frequently gather or linger.
Height of a structure -- the vertical distance between the mean original (prior to construction) grade at
the downhill side of the structure and the highest point of the structure, excluding chimneys, steeples,
antennas, and similar appurtenances that have no floor area.
Home occupation -- an occupation or profession which is customarily conducted on or in a residential
structure or property and which is (1) clearly incidental to and compatible with the residential use of the
property and surrounding residential uses; (2) which employs no more than two (2) persons other than
family members residing in the home.
increase in nonconformity of a structure -- any change in a structure or property which causes further
deviation from the dimensional standard(s) creating nonconformity such as, but not limited to,
reduction in water body, tributary stream, or wetland setback distance, increase in lot coverage, or
increase in height of a structure. Property changes or structure expansions which either meet the
dimensional standard or which cause no further increase in the linear extent of nonconformance with
existing structure shall not be considered to increase nonconformity. For example, there is no increase
in nonconformity with the setback requirement for water bodies, wetlands, and tributary streams if the
expansion extends no further into the required setback area than does any portion of the existing
nonconforming structure. Hence, a structure may be expanded laterally provided that the expansion
extends no closer to the water body, tributary stream, or wetland than the closest portion of the existing
structure from that water body, tributary stream, or wetland. Included in this allowance are expansions
which in-fill irregularly shaped structures.
Individual private campsite -- an area of land which is not associated with a campground, but which is
developed for repeated camping by only one group not to exceed ten (10) individuals and which involves
site improvements which may include but not be limited to a gravel pad, parking area, fire place, or tent
platform.
Industrial -- The assembling, fabrication, finishing, manufacturing, packaging, or processing of goods, or
the extraction of minerals.
Institutional -- a non-profit or quasi-public use, or institution such as a church, library, public or private
school, hospital, or municipally owned or operated building, structure, or land used for public purposes.
52
Lot area -- The area of land enclosed within the boundary lines of a jot, minus land below the normal
high-water line of a water body or upland edge of a wetland area and areas beneath roads serving two
or more lots.
Marina -- a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops, and marine fuel service facilities.
Market value -- the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration -- hand sampling, test boring, or other methods of determining the nature or extent
of mineral resources which create minimal disturbance to the land and which include reasonable
measures to restore the land to its original condition.
Mineral extraction -- any operation within any twelve (12) month period which removes more than one
hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other material from its
natural location and to transport the product removed away from the extraction site.
Minimum lot width -- the closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential -- a residential structure containing three (3) or more residential dwelling units.
Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure, or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming lot -- a single lot of record which, at the effective date of adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located.
Non-conforming structure -- a structure which does not meet any one or more of the following
dimensional requirements: setback, height, lot coverage or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use -- use of buildings, structures, premises, land, or parts thereof which is not allowed
in the district in which it is situated, but which is allowed to remain solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
53
Non-native species of vegetation -- species of vegetation listed by the Maine Department of Agriculture,
Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine ecosystems.
Normal high-water line (non-tidal waters) -- that line which is apparent from visible markings, changes
in the character of soils due to prolonged action of the water or changes in vegetation, and which
distinguishes between predominantly aquatic and predominantly terrestrial land. Areas contiguous with
great ponds that support non-forested wetland vegetation and hydric soils and that are at the same or
lower elevation as the water level of the great pond during the period of normal high-water are
considered part of the great pond.
Outlet stream -- any perennial or intermittent stream, as shown on the most recent higest resolution
version of the national hydrography dataset available from the United States Geological Survey on the
website of the United States Geological Survey or the national map, that flows from a freshwater
wetland.
Person -- an individual, corporation, government agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharfs, bridges, and other structures and uses extending over or below the normal high
water line or within a wetland.
Temporary: Structures which remain in or over water for less than seven (7) months in
any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over water for seven {7) months or more in
any period of twelve (12) consecutive months.
Principal structure -- a structure other than one which is used for the purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use -- a use other than one which is wholly incidental or accessory to another use on the same
lot.
Public facility -- any facility, including but not limited to, buildings, property, recreational areas, and
roads, which are owned, leased, or otherwise operated or funded by a governmental body or public
entity.
Recent floodplain soils -- the following soil series as described and identified by the National
Cooperative Soil Survey: ,
Fryeburg Hadley Limerick
Lovewell Medomak Ondawa
Alluvial Cornish Charles
Podunk Rumney Saco
Suncook Sunday Winooski
54
Recreational facility -- a place designed and equipped for the conduct of sports, leisure time activities,
and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle -- a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pickup camper,
travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a vehicle and not a
structure, the unit must remain with its tires on the ground, and must be registered with the State
Division of Motor Vehicles.
Replacement system -- a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change in design flow or use of the structure, or 2.)
any existing overboard wastewater discharge.
Residential dwelling unit -- a room or group of rooms designed and equipped exclusively for use as a
permanent, seasonal, or temporary living quarters for only one family at a time, and containing cooking,
sleeping, and toilet facilities. The term shall include mobile homes and rental units that contain cooking,
sleeping, and toilet facilities regardless of the time-period rented. Recreational vehicles are not
residential dwelling units.
Riprap -- rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and oil
stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point at which
it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road -- a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a driveway
as defined.
Salt marsh -- areas of coastal wetland (most often along coastal bays) that support salt tolerant species,
and where at average high tide during the growing season, the soil is irregularly inundated by tidal
waters. The predominant species is salt marsh cord grass (Spartina alterniflora). More open areas often
support widgeon grass, eelgrass, and Sago pondweed.
Salt meadow -- areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of salt marshes or open coastal waters, where the soil is saturated during the growing
season but which is rarely inundated by tidal water. Indigenous plant species include salt meadow cord
grass (Spartina patens) and black rush; common threesquare occurs in fresher areas,
Sapling -- a tree species that is Jess than two (2) inches in diameter at four and one half (4.5) feet above
ground level.
55
Seedling -- a young tree species that is less than four and one half (4.5) feet in height above ground level.
Service drop -- any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1. in the case of electrical service
a. the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground is
less than one thousand (1,000) feet in length.
Setback -- the nearest horizontal distance from the normal high-water line of a water body or tributary
stream or upland edge of a wetland, to the nearest part of a structure, road, parking space, or other
regulated object or area.
Shore frontage -- the length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline.
Shoreland zone -- the land area located within two hundred and fifty (250) feet, horizontal distance, of
the normal high-water line of any great pond; within 250 feet, horizontal distance, of the upland edge of
a coastal wetland, including all areas affected by tidal action; within 250 feet, horizontal distance, of the
upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal
high-water line of a stream.
Shoreline -- the normal high-water line_or upland edge of a freshwater or coastal wetland.
Storm-damaged tree -- a tree that has been uprooted, blown down, is lying on the ground, or that
remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream -- a free-flowing body of water from the outlet of a great pond or the confluence of two (2) .
perennial streams as depicted on the most recent , highest resolution version of the national
hydrography dataset available from the United State Geological Survey on the website of the United
States Geological Survey or the national map, , to the point where the stream becomes a river or where
the stream meets the shoreland zone of another water body or wetland. and a channel forms
downstream of the water body or wetland as an outlet, that channel is also a stream.
56
Structure -- anything temporarily or permanently located built, constructed or erected for the support,
shelter, or enclosure of persons, animals, goods, or property of any kind, or anything constructed or on
or in the ground,. The term includes structures temporarily or permanently located, such as decks,
patios, and satellite dishes.
Structure does not include fences; poles and wiring and other aerial equipment normally associated with
service drops, including guy wires and guy anchors; subsurface waste water disposal systems as defined
in Title 30-A, Section 4201, subsection 5; geothermal heat exchange wells as defined in Title 32, Section
4700-E, subsection 3-C; or wells or water wells as defined in Title 32, Section 4700-E, subsection 8.
Substantial start -- completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated cost.
Subsurface sewage disposal system -- any system designed to dispose of waste or wastewater on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism, or
apparatus used for those purposes; does not include any discharge system licensed under 38 M.R.S.A.
section 414, any surface waste water disposal system, or any municipal or quasi-municipal sewer or
waste water treatment system.
Sustained slope -- a change in elevation where the referenced percent grade is substantially maintained
or exceeded throughout the measured area.
Tidal waters -- all waters affected by tidal action during highest annual tide.
Tidal waters -- all waters affected by tidal action during the higest annual tide.
Timber harvesting and related activities -- timber harvesting, the construction and maintenance of
roads used primarily for timber harvesting and other activities conducted to facilitate timber harvesting.
Tree -- a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four
and one half (4.5) feet above the ground, with a more or less definite crown, and reaching a height of at
least ten (10) feet at maturity.
Tributary stream -- a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or presence of a bed, devoid of topsoil, containing
waterborne deposits or exposed soil, parent material, or bedrock; and which is connected hydrologically
with other water bodies. "Tributary stream" does not include rills or gullies forming because of
accelerated erosion in disturbed soils where the natural vegetation cover has been removed by human
activity.
57
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only
' applies to that portion of the tributary stream located within the shoreland zone of the receiving
water body or wetland.
Note: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland -- the boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or
the highest annual tide level, including all areas affected by tidal action. For purposes of a freshwater
wetland, the upland edge is formed where the soils are not saturated for a duration sufficient to
support wetland vegetation; or where the soils support the growth of wetland vegetation, but such
vegetation is dominated by woody stems that are six (6) meters (approximately twenty (20) feet) tall or
taller.
Vegetation -- all live trees, shrubs, and other plants including without limitation, trees both over and less
than four (4) inches in diameter, measured 4-1/2 feet above ground level.
Velocity zone ~ an area of special flood hazard extending from offshore to the inland limit of the primary
frontal dune along an open coast and any other area subject to high velocity wave action from storms or
seismic sources.
Water body -- any great pond or stream.
Water crossing -- any project extending from one bank on the opposite river of a stream, tributary
stream, or wetland whether under, through, or over the water or wetland. Such projects include but
may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as
maintenance work on these crossing. This definition includes crossings for timber harvesting equipment
and related activities.
Wetland -- a freshwater or coastal wetland.
Windmill- a machine that is powered by the energy of the wind. It is designed to convert the energy of
the wind into more useful forms using rotating blades or sails. The term also refers to the structure it is
commonly built on.
Woody Vegetation -- live trees or woody, non-herbaceous shrubs.
58