Town of Stonington Shoreland Zoning Ordinance (effective 1998; amended through March 6, 2023)
Stonington, Maine
· adopted 2023-03-06
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 3d61eeabd996 · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Uap
e
Shoreland Zoning Ordinance
Effective Date: March 2, 1998
Amended: September 28, 2009
Amended: December 20, 2010
Amended: March 7, 2016
Amended: May 15, 2021
Amended: March 5, 2022
Amended: March 6, 2023
Certified by: Z4j D.. Conn 3 a / 23
| _---- a LLY.
Ke ber Korredrec 3heofe3
0 Baek & Kive grey 3/2 o/ 23
Municipal Officers Date
G Attest: True Copy: C. J H | a4
Town Clerk Date
Town of Stonington, Maine Shoreland Zoning Ordinance
TABLE OF CONTENTS
Page
[, PUPPOSES oo. cece esseenseeseeeseceeaeseeeaesesassesesecassssesacsccsesevseseessacsesscscssssessscsevavesvavevaversarensatseened
2. AUthority occ cecccccceceecsessesescesesesecsessssescsessessvevevsssesssssescsesacassevsenevscavesssesecssersavacensavseataceeeaeed
4, Effective Date oo. c i ccccseeccescsesessescseseseseeesvccssssscasscsevsvsesessvsvsvesacsessvsvsvessevevavavsverseavavacareneaeeed
5. Availability occ ccceecesseeesesesescsesecseecsesescsessvesevsssssscccecscacscesscscscavecnevsvavavacersavacavavsaverevevseans
©. Severability occ cececcccsesecsesescesceecscsencvecsesecscecsevssscavserevsevecaveevavsseceevseavatenssvastacatsscatssecseeea
7. Conflicts with Other Ordinances 20.0... cccccccsscscseesesevevseesesescescssescscssuscsssevessevsesseevsvrsarserecarenes4
8. Amendments oo... eccceeessescsesseseeecsesccscscsecavsesevsvsessesssuvacsesscsseessessvasacsavacsecuvarsescesavaveavsenseacenes
9. Districts and Zoning Map .........cecceecscssssesesescsescscscescsesescevsessscscscscscecscsvevevsvavsessavsvevacsvavacavsvasseseed
A. Official Shoreland Zoning Map ......ccccccceccessscsesescscscsescscsescscsescscsvsescssscsvevsvecevavavevscavacseevaeed
B. Scale Of Map oo... ccccccccsessccescsseecseseesesesesacsesesacsesccsenevassavssessacscessscsssscassscsvsevaesssevacateavereeeaed
C. Certification of Official Shoreland Zoning Map .....c.cccccccccccsescseccseseecsevseseavscsssssvscsvseneeesevsd
D. Changes to the Official Shoreland Zoning Map .........c:cccccccccesccssessscscesssescesscacneesvevseavseeesseeed
10. Interpretation of District Boundaries ........cccccccccccseccscesescesescscsscscessscessstscecvscsesscavscsavsseecacarereeeeed
IL. Land Use Requirements ..0....0.cccccccccccccssesesescescsesessesesssetsscssencassececsavscavssssvansvesasvssatsavanearsesseneed
12, Non-Conformance oo... cccecececceeeseseeceseseaesesessescsevsessescsesesescsesssscsesssscssvstaseavesnesstarsavseeneaseeer®
A. PULPOSC. cece cee ceccenesseneesecaescescesssecsesaesasseacsccaccssesessesscsevsevscassesscsecescescascasrsesceseacaessesesO
B. Gereralb ieee cscccceecsesseeeeseeseeesesssssesecaececsecsenevseveecsevscsscsscssssscessessessssvsevstsstareevareateecereasc
C. Non-conforming Structures oo... cccceecesesesecseseecescscescsecsesesscsessescsecsesssscsssesscassssasscvssnsatareens®
D. Non-conforming USes .........cccceccesessssssessesesesscecsesscsesecsessesesssecscssvavscsvacsecavecvecseeveatacersareneee)
E, Non-conforming Lots... ccceceeececeseescensesesceecscescsscsesessvsesessvensevstescsterescaseseatsavsessesens LO
13. Establishment of Districts 0.0... ccc eccccecceseseeeesesceesseseeseseesesessesesstscecstsestssseesesssevsessteseereesersel |
A. Resource Protection District .0..cccccccccsesseseseeseesescssesecatsstsccsevsessescessassessscesascasersesvesearel L
B. Limited Residential District... cccceccccesesecscscssesssevscsssevsesscssscsesssscevessevscaveatectavstersereaed 2
C. Limited Commercial District .......cc.ccccescsesessssecescsccssesesesssesssevsssscscessstsvsssvsssesseavavsteseseard 2
D. General Development I District 2.0... ccc cecceccessescccesescessesseescscscecsevsessscsvasessstssavscsseel 2
E. General Development II District... ccceccccccsscssesesessescsesevsecsessscescsrssestsstecseesvacsecseeeeeed 2
F. Commercial Fisheries/Maritime Activities District ..0.000000.ccceccessscscveessesseseseeseseareseeeee 2
G. Stream Protection District..........0.0 0c cece cece cee ee ec sesesseceaeecesesetesteestereeereesenl4
14. Table of Land Uses oo... ccc ccececeseseeceseseeseseseesescsecsesesscsssecseesscsesscsevssesstscssesvscsevscaseevavencerenessesee 4
15. Land Use Standards 2... cccecccccccececsessescssescscsevecscscescscescessscssasvsssevavsevevseacsevseassvssestasersarsaraeel 6
A. Minimum Lot Standards 2.00.00. ccccceeccsesceecsessesesesseseescscsecsesssecscsssevscsetsssssssesvevsesseareeereesveee l 6
B. Principal and Accessory Structures ..0..0.ccececcccccsescseeeseeseecssseecessecseseesseseesacssesassesessaseceesee 7
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Below the Normal High-Water Line of a Water body or Within a Wetland.....................20
D. Campgrounds occ cceececcecesesessssetensesesenesesscacsescstvscacsearseescetscisssstescstscatsesesseseersvereateeeeened ll
E. Individual Private Campsites ........ccccccccscsesssesecsescesecescscsssssseseevscsssessestevsceressatstavavecneeseeeZl
F. Commercial and Industrial Uses ......ccccccccsesccscsessessescsssessescsscscssescsssctacaeesvecsevseersavsnenseree 22
G. Parking Areas... ccsecsescsssesessesesessscsesevsescassesessvssstssencscssseseussssssavscssnesevscarssusvavevavseanenens22
H. Roads and Driveways o....cecceesesesesssessssescscsescsesensscssueeecessesescsecsestscssvesevevscavsensvsvavevaveanene2
J. Storm Water Runoff oo. ccccccsccccscsecsescsesessescecscscccsvscscesecvevsescavscessesvevesacussvavssssesserssseneld
K. Septic Waste Disposal oo... cc cccccecseseeeeseseecseseeseseseseeescecsesesseeesvscsceesnsesseesscesessarseseeesQO
L. Essential Services ..0...ccceccccceceesseseseesessseeesseceescsscscssacsesecsssesesssacsceesssssssvsssesvasavseeseeseees2O
M. Mineral Exploration and Extraction .......cccccccsscscsesessssescssscesesesesvsvscacessessestscasessststsvevsereene2O
Revision Date: March 6, 2023 Page 1 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
N. Agriculture oo. ccccceececeeseeseeeseeseceneenseessesssessssecessessecaeseseesseseesascsscsccaeevsesssscssssasessesesQl
O. Timber Harvesting 0.0.0.0 ccccccccecssesecsecssesecsecsesscesccsecsecaeesecsuesseeseessesessecssccscesscstssssesessesteee2O
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ...........28
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal..................0.00060606-.30
R. Exemptions to Clearing and Vegetation Removal Requirements................0ccc0e ese 32
S. Revegetation Requirements........0.0...c cece cece cece cee ee eats ene eeeeeetesusetsseeenenenseens DS
T. Erosion and Sedimentation Control oo... cccccccessssssesesccsessesetecsesesesssseescseesscsccssseessseseeeeee dd
UU, SOUS. seccceeeeeesceeeneesesassseseesvsusaesavsesseaessesecsessessesscsessesasssesessssecsecaesavsnsatssssarseeseesssceaseee SO
Vi. Water Quality oo. ccsceccecesenscsecneccseenseesessscsscesstensevsessaeessesnesssesessesesearesssessecaterseeseens DO
W. Archaeological Sites oo... cececceceecessesceseeseessessceeeeecscesccsecsccsucsecseessessssecsecascstsassaessseseess DO
X. Sideline Setback Requirements... cccccscseceecseeseeseseesecsceeceeseescnecseesevsenssateasecsseesesaeseses DO
16. Administration 2c ce cee ceeceecceeeesescesceeseesesesecaesesecaesesaesecaesessesessssesesscateacsssessstsecssssesesseneaees dO
A. Administering Bodies and Agents ...c.cccccccceccssssscsssecsecsesacescseesensesessesscsteateatssesecsterenses DO
B. Permits Required... ccccccscescccscsccsecsesseseessecsesscsecssceseaceavsncatssessesesstersasescescsscstestsneeese dD
C. Permit Application... ccccesscssesecsensesecaseassesscesceeceecsseeceecseeesseeecseteseestsssesssseatsassessed 7
D. Procedure for Administering Permits .....ccccccccccccessesscesccsesseeesessessetseessersestssesesseseee dS
E, Special Exceptions 0... ccccescceeseessessesecsecssetevessaesseeeecssesssescsseeeesassasesessessesatsstssesssesaees DD
PF. Expiration of Perinat... ccc ccecessecsecsecsecessessecscecsecesssseessesscssessesassatsaessecatsstssssacessssa
G. Installation of Public Utility Service 0... cccccccecscecesecseceessesesesesssseesesscsseateateesseeseseeee 40)
H. Appeals oo... csccesccsseseceresnsesecseessecceeseneeesseeesaseecseaeeasseesensssssssesseesseastessesscssaseneseseees 40
[Enforcement 00... ccc ecceceseeecesceseescessessensenesnscseceevseesecsscsecsseesesesseseessessessteaseasessesessessater 4
17. Definitions oo. ccc ceeseesesecteensceseesersecsecsecsecaessecsessecsscsssuccssesecsacsscaessasassateatsateassscesrsserees 4
Revision Date: March 6, 2023 Page 2 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Section 1. Purposes
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect commercial fishing and maritime industries; to
protect freshwater and coastal wetlands; to control building sites, placement of structures and land
uses; to conserve shore cover, and visual as well as actual points of access to inland and coastal
waters, to conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
Section 2. Authority
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435-449
of the Maine Revised Statutes Annotated (M.R.S.A.).
Section 3. Applicability
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
¢ normal high-water line of any great pond
e upland edge of a coastal wetland, including all areas affected by tidal action, or
e upland edge of a freshwater wetland,
e and all land areas within 100 feet, horizontal distance, of the normal high-water line of a
stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier or
other structure extending or located below the normal high-water line of a water body or within
a wetland.
NOTE: Coastal wetlands, by definition, include all areas affected by tidal action, not just those areas
where salt marshes and salt meadows exist. Cobble and sand beaches, mudflats, and rocky
ledges, stairs below the highest annual tide are all considered to be coastal wetlands.
Section 4. Effective Date
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
adopted by the municipal legislative body on March 2, 1998, shall not be effective unless
approved by the Commissioner of the Department of Environmental Protection. A certified
copy of the Ordinance, or Ordinance Amendment, attested and signed by the Municipal Clerk,
shall be forwarded to the Commissioner for approval. If the Commissioner fails to act on this
Ordinance or Ordinance Amendment, within forty-five (45) days of his/her receipt of the
Ordinance, or Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
Revision Date: March 6, 2023 Page 3 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
B. Repeal of Municipal Timber Harvesting Regulation. The municipal regulation of timber
harvesting activities is repealed on the statutory date established under 38 M.R.S.A. section
438-B(5), at which time the Stae of Maine Department of Conservation's Bureau of Forestry
shall administer timber harvesting standards in the shoreland zone. One the date established
under 38 M.R.S.A. section 438-B(5), the following provisions of this Ordinance are repealed:
¢ Section 14. Table of Land Uses, Item 3 (Forest management activities except for timber
harvesting) and Item 4 (Timber harvesting);
¢ Section 15(Q) in its entirety; and
¢ Section 17. Definitions, the definitions of "forest management activities", "residual
basal area", "skid trail", and "slash".
NOTE: The statutory date established under 38 M.R.S.A. section 438-B(5) is the effective date of
state-wide timber harvesting standards. That date is "the first day of January of the 2"! year
following the year in which the Commissioner of Conservation determines that at least 252 of 336
municipalities identified by the Commissioner of Conservation as the municipalities with the
highest acherage of timber harvesting activity on an annual basis for the period 1992-2003 have
either accepted the state-wide snandards or have adopted an ordinance identical to the state-wide
standards." 38 M.R.S.A. section 438-B(5) further provides that "the Commissioner of
Conservation shall notifty the Secretary of State in writing and advise the Secretary of the effective
date of the state-wide standards."
Section 5. Availability
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible
to any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
Section 6. Severability
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
Section 7. Conflicts with Other Ordinances
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of
this Ordinance or of any other ordinance, regulation or statute administered by the municipality,
the more restrictive provision shall control.
Section 8. Amendments
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments,
attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body and
shall not be effective unless approved by the Commissioner, If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the
forty-five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
Revision Date: March 6, 2023 Page 4 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Section 9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Shoreland Zoning Map(s) which
is (are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) General Development I
(5) General Development II
(6) Commercial Fisheries/Maritime Activities
(7) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than:
1 inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall
be certified by the attested signature of the Municipal Clerk and shall be located in the
municipal office. In the event the municipality does not have a municipal office, the Municipal
Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section
8, are made in the district boundaries or other matter portrayed on the Official Shoreland
Zoning Map, such changes shall be made on the Official Shoreland Zoning Map within thirty
(30) days after the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
Section 10. Interpretation of District Boundaries
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are
property lines, the centerlines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact location of district
boundary lines, the Board of Appeals shall be the final authority as to location.
Section 11. Land Use Requirements
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
Revision Date: March 6, 2023 Page 5 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Section 12. Non-conformance
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except
as otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
B. General
(1) Transfer of Ownership: Non-conforming structures, lots, and uses may be transferred,
and the new owner may continue the non-conforming use or continue to use the non-
conforming structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance: This Ordinance allows, without a permit, the normal upkeep
and maintenance of non-conforming uses and structures including repairs or renovations
that do not involve expansion of the non-conforming use or structure, and such other
changes in a non-conforming use or structure as federal, state, or local building and safety
codes may require.
C. Non-conforming Structures
(1) Expansions: All new principal and accessory structures, excluding functionally water-
dependant uses, must meet the water body, tributary stream, or wetland setback
requirements contained in Section 15{B)(1). A non-conforming structure may be added to
or expanded after obtaining a permit from the same permitting authority as that for a new
structure, if such addition or expansion does not increase the non-conformity of the
structure and is in accordance with subparagraphs (a) and (b) below.
(a) Expansion of any portion of a structure within 25 feet of the normal high-water line
of a water body, tributary stream, or the upland edge of a wetland is prohibited, even
if the expansion wull not increase the nonconformity with the water body, tributary
stream or wetland setback requirement. Expansion of an accessory structure that is
located closer to the normal high-water line of a water body, tributary stream, or
upland edge of a wetland than the principal structure is prohibited, even if the
expansion will not increase nonconformity with the water body, tributary stream, or
wetland setback requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal
structure is entirely located less than 25 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland, that structure may be
expanded as follows, as long as all other applicable municipal land use standards are
met and the expansion is not prohibited by Section 12(C)(1).
(i) The maximum total footprint for the principal structure may not be expanded to a
size greater than 800 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the principal
structure may not be made greater than 15 feet or the height of the existing
structure, whichever is greater.
Revision Date: March 6, 2023 Page 6 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(c) All other legally existing nonconforming principal and accessory structures that do
not meet the water body, tributary stream, or wetland setback requirements may be
expanded or altered as follows, as long as other applicable municipal land use
standards are met and the expansion is not prohibited by Section 12(C)(1) or Section
12(C)(1)(a), above.
(i) For structures located less than 100 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland, the maximum
combined total footprint for all structures may not be expanded to a size greater
than 1,000 square feet or 30% larger than the footprint that existed on January 1,
1989, whichever is greater. The maximum height of any structure may not be
made greater than 20 feet or the height of the existing structure, whichever is
greater.
(1i) For structures located Jess than 100 feet from the normal high-water line of a
great pond classified as GPA or a river flowing to a great pond classified as
GPA, the maximum combined total footprint for all structures may not be
expanded to a size greater than 1,500 square feet or 30% larger than the footprint
that existed on January 1, 1989, whichever is greater. The maximum height of any
structure may not be made greater than 25 feet or the height of the existing
structure, whichever is greater. Any portion of those structures located less than
100 feet from the normal high-water line of a water body, tributary stream, or
upland edge of a wetland must meet the footprint and height limits in Section
12(C)(1)(b)G) and Section 12(C)(1)(c)(i), above.
(111)In addition to the limitations in subparagraphs (i) and (ii), for structures that are
legally nonconforming due to their location within the Resource Protection
District when located at less than 250 feet from the normal high-water line of a
water bedy or the upland edge of a wetland, the maximum combined total
footprint for all structures may not be expanded to a size greater than 1,500 square
feet or 30% larger than the footprint that existed at the time the Resource
Protection District was established on the lot, whichever is greater. The maximum
height of any structure may not be made greater than 25 feet or the height of the
existing structure, whichever is greater, except that any portion of those structures
located less than 100 feet from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland must meet the footprint and height
limits in Section 12(C)(1)(b)(i) and Section 12(C)(1){c)(i), above.
(d) An approved plan for expansion of a nonconforming structure must be recorded by
the applicant with the registry of deeds, within 90 days of approval. The recorded
plan must show the existing and proposed footprint of the non-conforming structure,
the existing and proposed structure height, the footprint of any other structures on the
parcel, the shoreland zone boundary and evidence of approval by the municipal
review authority.
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed
under a non-conforming structure, the structure and new foundation must be placed
such that the setback requirement is met to the greatest practical extent as determined
Revision Date: March 6, 2023 Page 7 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
by the Planning Board or its designee, basing its decision on the criteria specified in
Section 12(C)(3) Relocation, below. If the completed foundation does not extend
beyond the exterior dimensions of the structure, except for expansion in conformity
with Section 12(C)(1)(a) above, and the foundation does not cause the structure to be
elevated by more than three (3) additional feet, as measured from the uphill side of
the structure (from original ground level to the bottom of the first floor sill), it shall
not be considered to be an expansion of the structure.
(3) Relocation: A non-conforming structure may be relocated within the boundaries of the
parcel on which the structure is located provided that the site of relocation conforms to all
setback requirements to the greatest practical extent as determined by the Planning Board
or its designee, and provided that the applicant demonstrates that the present subsurface
sewage disposal system meets the requirements of State law and the State of Maine
Subsurface Wastewater Disposal Rules (Rules), or that a new system can be installed in
compliance with the law and said Rules. In no case shall a structure be relocated in a
manner that causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for
septic systems, and the type and amount of vegetation to be removed to accomplish the
relocation,
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation in accordance with Section 15(S). In addition, the
area from which the relocated structure was removed must be replanted with vegetation.
Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted,
no one species of tree shall make up more than 50% of the number of trees planted.
Replaced trees must be planted no further from the water or wetland than the trees that
were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged,
or removed must be reestablished within the setback area. The vegetation and/or
ground cover must consist of similar native vegetation and/or ground cover that was
disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees,
or a combination thereof.
(3) Reconstruction or Replacement: Any non-conforming structure which is located less
than the required setback from a water body, tributary stream, or wetland and which is
removed, or damaged or destroyed, regardless of the cause, by more than 50% of the market
Revision Date: March 6, 2023 Page 8 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
value of the structure before such damage, destruction or removal, may be reconstructed
or replaced provided that a permit is obtained within eighteen (18) months of the date of
said damage, destruction, or removal, and provided that such reconstruction or replacement
is in compliance with the water body, tributary stream or wetland setback requirement to
the greatest practical extent as determined by the Planning Board or its designee in
accordance with the purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its non-conformity. If the reconstructed or
replacement structure is less than the required setback it shall not be any larger than the
original structure, except as allowed pursuant to Section 12(C)(1) above, as determined by
the non-conforming footprint of the reconstructed or replaced structure at its new location.
If the total footprint of the original structure can be relocated or reconstructed beyond the
required setback area, no portion of the relocated or reconstructed structure shall be
replaced or constructed at less than the setback requirement for a new structure. When it
is necessary to remove vegetation in order to replace or reconstruct a structure, vegetation
shall be replanted in accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market
value, or damaged or destroyed by 50% or less of the market value of the structure,
excluding normal maintenance and repair, may be reconstructed in place if a permit is
obtained from the Code Enforcement Officer within one year of such damage, destruction,
or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to
the criteria in Section 12(C)(3) above, the physical condition and type of foundation
present, if any.
(4) Change of Use of a Non-conforming Structure: The use of a non-conforming structure
may not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources
than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and commercial fishing and maritime
activities, and other functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions: Expansions of non-conforming uses are prohibited, except that non-
conforming residential uses may, after obtaining a permit from the Planning Board, be
expanded within existing residential structures or within expansions of such structures as
allowed in Section 12(C)(1) above.
Revision Date: March 6, 2023 Page 9 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(2) Resumption Prohibited: A lot, building or structure in or on which a non-conforming
use is discontinued for a period exceeding one year, or which is superseded by a
conforming use, may not again be devoted to a non-conforming use except that the
Planning Board may, for good cause shown by the applicant, grant up to a one year
extension to that time period. This provision shall not apply to the resumption of a use of
a residential structure provided that the structure has been used or maintained for residential
purposes during the preceding five (5) year period.
(3) Change of Use: An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the subject
and adjacent properties and resources, including water dependent uses in the CFMA
district, than the former use, as determined by the Planning Board. The determination of
no greater adverse impact shall be made according to criteria listed in Section 12(C)(5)
above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and
shore frontage can be met. Variances relating to setback or other requirements not
involving lot area, lot width or shore frontage shall be obtained by action of the Board of
Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do
not meet the dimensional requirements of this Ordinance, and if a principal use or structure
' exists on each lot, the non-conforming lots may be conveyed separately or together,
provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through
4807-D) and the State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be
as conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels
are in single or joint ownership of record at the time of or since adoption or amendment of
this Ordinance, if any of these lots do not individually meet the dimensional requirements
of this Ordinance or subsequent amendments, and if one or more of the lots are vacant or
contain no principal structure the lots shall be combined to the extent necessary to meet the
dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective on March 9, 1994, and
recorded in the registry of deeds if the lot is served by a public sewer or can accommodate
Revision Date: March 6, 2023 Page 10 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
a subsurface sewage disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of
lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
Section 13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems,
or scenic and natural values. This district shall include the following areas when they occur
within the limits of the shoreland zone, exclusive of the Stream Protection District, except that
areas which are currently developed and areas which meet the criteria for the Limited
Commercial, General Development I, or Commercial Fisheries/Maritime Activities Districts
need not be included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands, salt
marshes and salt meadows, and wetlands associated with great ponds, which are rated
"moderate" or "high" value waterfowl and wading bird habitat, including nesting and
feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W) that
are depicted on a Geographic Information System (GIS) data layer maintained by either
MDIF&W or the Department. Coastal wetlands are rated as of January 1,1973, and
freshwater wetlands are rated as of December 31, 2008. For the purposes of this paragraph
"wetlands associated with great ponds" shall mean areas characterized by non-forested
wetland vegetation and hydric soils that are contiguous with a great pond, and have a
surface elevation at or below the water level of the great pond during the period of normal
high water. "Wetlands associated with great ponds" are considered to be part of that great
pond.
(2) This district shall also include 100 year floodplains adjacent to tidal waters as shown on
Federal Emergency Management Agency Flood Insurance Rate Maps or Flood Hazard
Boundary Maps.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater or coastal wetland as defined, and which are not
surficially connected to a water body during the period of normal high water.
(5) Land areas adjacent to tidal waters which are subject to severe erosion or mass movement,
such as steep coastal bluffs.
Revision Date: March 6, 2023 Page 11 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
B. Limited Residential District. The Limited Residential District includes those areas suitable
for residential and recreational development. It includes areas other than those in the Resource
Protection District, or Stream Protection District, and areas which are used less intensively
than those in the Limited Commercial District, the General Development Districts, or the
Commercial Fisheries/Maritime Activities District.
C. Limited Commercial District. The Limited Commercial District includes areas of mixed,
light commercial and residential uses, exclusive of the Stream Protection District, which
should not be developed as intensively as the General Development Districts. This district
includes areas of two or more contiguous acres in size devoted to a mix of residential and low
intensity business and commercial uses. Industrial uses are prohibited except for fishing
related commercial uses with Planning Board approval.
D. General Development I District. The General Development I District includes the following
types of existing, intensively developed areas:
(1) Areas of two or more contiguous acres devoted to commercial, industrial or intensive
recreational activities, or a mix of such activities, including but not limited to the following:
(a) Areas devoted to manufacturing, fabricating or other industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade and service activities, or other
commercial activities; and
(c) Areas devoted to intensive recreational development and activities, such as, but not
limited to amusement parks, race tracks and fairgrounds.
(2) Areas otherwise discernible as having patterns of intensive commercial, industrial or
recreational uses.
E. General Development II District. The General Development IJ District includes the same
types of areas as those listed for the General Development I District. The General
Development II District, however, shall be applied to newly established General Development
Districts where the pattern of development at the time of adoption is undeveloped or not as
intensively developed as that of the General Development I District.
Portions of the General Development District I or I] may also include residential development.
However, no area shall be designated as a General Development I or II District based solely
on residential use.
In areas adjacent to great ponds, the designation of an area as a General Development District
shall be based upon uses existing at the time of adoption of this Ordinance. There shall be no
newly established General Development Districts or expansions in area of existing General
Development Districts adjacent to great ponds.
F. Commercial Fisheries/Maritime Activities District. The Commercial Fisheries/ Maritime
Activities District includes areas where the existing predominant pattern of development is
consistent with the allowed uses for this district as indicated in the Table of Land Uses,
Section 14, and other areas which are suitable for functionally water-dependent uses, taking
into consideration such factors as:
(1) Shelter from prevailing winds and waves;
(2) Slope of the land within 250 feet, horizontal distance, of the shoreline;
(3) Depth of the water within 150 feet, horizontal distance, of the shoreline;
Revision Date: March 6, 2023 Page 12 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(4) Available support facilities including utilities and transportation facilities; and
(5) Compatibility with adjacent upland uses.
G. Stream Protection District. The Stream Protection District includes all land areas within
one hundred (100) feet, horizontal distance, of the normal high-water line of a stream,
exclusive of those areas within two-hundred fifty (250) feet, horizontal distance, of the
normalhigh-water line of a great pond, or river, or within two hundred and fifty (250)feet,
horizontal distance, of the upland edge of a freshwater wetland. Where a stream and its
associated shoreland area are located within two hundred and fifty (250)feet, horizontal
distance, of the above water bodies or wetlands, that land area shall be regulated under the
terms of the shoreland district associtated with that water body or wetland.
Section 14. Table of Land Uses
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform
with all of the applicable land use standards in Section 15. The district designation for a particular
site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land use
standards.)
No- Prohibited
PB- Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI- Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection GD -General Development I and
General Development II
LR- Limited Residential CFMA-Commercial Fisheries/
Maritime Activities District
LC- Limited Commercial SP- Stream Protection
Revision Date: March 6, 2023 Page 13 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES DISTRICT
SP RP LR Le GD CFMA
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking yes yes _yes yes yes yes
2. Motorized vehicular traffic on existing roads and trails yes yes yes yes yes yes
3. Clearing or removal of vegetation for activities other than CEO! yes yes yes yes
timber harvesting CEO!
4. Fire prevention activities yes yes yes yes yes yes
5. Wildlife management practices yes yes yes yes yes yes
ee
6. Soil and water conservation practices yes yes yes yes yes yes
7. Mineral exploration no yes? _yes2 yes? yes es2
eee VES VES OS® VES VES
8. Mineral extraction including sand and gravel extraction no PB3 PB PB PB PB
9. Surveying and resource analysis yes yes yes yes yes yes
10. Emergency operations yes yes yes yes yes yes
11. Agriculture yes PB yes yes yes yes
12. Aquaculture PB PB PB yes yes yes
13. Principal structures and uses
A. One and two family residential, including driveways PB4 pp9 CEO CEO CEO no
B. Multi-unit residential no no PB PB PB no
C. Commercial no nolO® yg lO PB PB PB°
D. Industrial no no no nol3 PB PB
E. Governmental and institutional no no PB PB PB PBS
F.Small non-residential facilities for educational, scientific, or
nature interpretation purposes PB4 PB CEO CEQ CEO PBS
14. Structures accessory to allowed uses PB4 PB CEO CEO _ yes yes
15. Piers, docks, wharfs, bridges and other structures and uses
extending over or below the normal high-water line or within
a wetland
a. Temporary CEO!I] -- Ggoli =CEO!! = ceo!!! ~--scgo!! col!
b. Permanent PB PB PB PB PB ppd
16. Conversions of seasonal residences to year-round LP 1 LPI LPI LPI LPI No
residences
17. Home occupations PB PB PB CEO _ yes yes
18. Private sewage disposal systems for allowed uses LP1 LPI LPI LPI LPI LPI
19. Essential services PBS PB® PB PB PB PB
Revision Date: March 6, 2023 Page 14 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
ee
A. Roadside distribution lines (34.5kV and lower) CEO® CEO® CEO CEO CEO CEO
eee
B. Non-roadside or cross-country distribution lines PBS PB® CEO CEO CEO CEO
involving ten poles or less in the shoreland zone
C. Non-roadside or cross-country distribution lines PB® PBS PB PB PB PB
involving eleven or more poles in the shoreland zone
eee ere eee merreerer r"ce"®_e=-- rr
D. Other essential services PBS PBS PB PB PB PB
20. Service drops, as defined, to allowed uses yes yes yes yes yes yes
21. Public and private recreational areas involving PB PB PB CEO CEO CROCS
minimal structural development
22. Individual, private campsites CEO CEO CEO CEO CEO CEO
23. Campgrounds no no? PB PB PB no
IO
24. Road construction PB no' PB PB PB PB?
25. Parking facilities no no? PB PB PB PB»
26. Marinas PB no PB PB PB PB
27. Filling and earth moving of <10 cubic yards CEO CEO yes yes yes yes
28. Filling and earth moving of >10 cubic yards PB PB CEO CEO CEO CEO
29. Signs yes yes yes yes yes yes
"aA Tl... nw LD NS OCC ooo oes;
30. Uses similar to allowed uses CEO CEQ CEO CEO CEO CEO
31. Uses similar to uses requiring a CEO permit CEO CEO CEO CEO CEO CEO
32. Uses similar to uses requiring a PB permit PB PB PB PB PB PB
! Ty RP not allowed within 100 feet horizontal distance, of the normal high-water line of great ponds,
excep! to remove safety hazards.
2 Requires permit from the Code Enforcement Officer if more than 100 square fect of surface area,
in total, is disturbed.
3 In RP not allowed in areas so designated because of wildlife value.
4. Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5 Functionally water-dependent uses and uses accessory to such water dependent uses only
6 See further restrictions in Section 15( L)(2).
7 Except when area is zoned for resource protection due to floodplain criteria in which case
apermit is required from the PB.
8 Except as provided in Section 15(H)(3).
9 Single family residential structures may be allowed by special exception only according to the
provisions of Section 16(E), Special Exceptions. Two-family residential structures are prohibited.
10 Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds,
that are allowed in the respective district.
11 Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12 Permit not required: but must file a written "notice of intent to construct" with CEO.
13 Except commercial fishcrics industry with PB approval
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection,
pursuant to 38 M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great
pond, river, stream or brook and opcrates in such a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other matcrials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
Revision Date: March 6, 2023 Page 15 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Section 15. Land Use Standards
All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
A. Minimum Lot Standards
Minimum Lot Minimum
(1.} Area (sq. ft.) Shore Frontage (ft.)
(a) Residential per dwelling unit
(i) Within the Shoreland Zone
Adjacent to Tidal Areas 30,000 150
A. With new ADU 60,000 300
(ii) Within the Shoreland Zone
Adjacent to Non-Tidal Areas 40,000 200
A. Withnew ADU 80,000 400
(b) Governmental, Institutional, Commercial or Industrial
per principal structure
(i) Within the Shoreland Zone
Adjacent to Tidal Areas, Exclusive
of Those Areas Zoned for
Commercial Fisheries and
Maritime Activities 40,000 200
(ii) Within the Shoreland Zone
Adjacent to Tidal Areas Zoned
for Commercial Fisheries and
Maritime Activities NONE NONE
(111) Within the Shoreland Zone
Adjacent to Non-tidal Areas 60,000 300
(c) Public and Private Recreational Facilities
(i) Within the Shoreland Zone Adjacent
to Tidal and Non-Tidal Areas 40,000 200
(2) Land below the normal high-water line of a water body or upland edge of a wetland and
land beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
Revision Date: March 6, 2023 Page 16 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial
or industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds, one hundred (100) feet,
horizontal distance from the upland edge of a coastal wetland and one hundred (100) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary streams,
or the upland edge of a freshwater wetland, except that in the General Development I District
the setback from the normal high-water line shall be at least twenty five (25) feet, horizontal
distance, and in the Commercial Fisheries/Maritime Activities District there shall be no
minimum setback. In the Resource Protection District the setback requirement shall be 250
feet, horizontal distance, except for structures, roads, parking spaces or other regulated
objects specifically allowed in that district in which case the setback requirements specified
above shall apply.
NOTE: The Natural Resources Protection Act, 38 M.S.R.A. Sections 480-A through 480-HH,
requires the Department of Environmental Protection to designate areas of "significant
wildlife habitat".
Permitting under the Natural Resources Protection Act for activities adjacent to significant
wildlife habitat areas may require greater setbacks. Contact your local Department of
Environmental Protection office to see if additional permitting is required. END NOTE
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
(b) For principal structures, water and wetland setback measurements shall be taken from
the top of a coastal bluff that has been identified on Coastal Bluff maps as being "highly
unstable" or "unstable" by the Maine Geological Survey pursuant to its "Classification
of Coastal Bluffs" and published on the most recent Coastal Bluff map. If the applicant
and the permitting official(s) are in disagreement as to the specific location of a "highly
unstable" or "unstable" bluff, or where the top of the bluff is located, the applicant may
at his or her expense, employ a Maine Registered Professional Engineer, a Maine
Revision Date: March 6, 2023 Page 17 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Certified Soil Scientist, a Maine State Geologist, or other qualified individual to make a
determination. If agreement is still not reached, the applicant may appeal the matter to
the board of appeals.
(c) On a non-conforming lot of record on which only a residential structure exists, and it is
not possible to place an accessory structure meeting the required water body, tributary
stream or wetland setbacks, the code enforcement officer may issue a permit to place a
single accessory structure, with no utilities, for the storage of yard tools and similar
equipment. Such accessory structure shall not exceed eighty (80) square feet in area nor
eight (8) feet in height, and shall be located as far from the shoreline or tributary stream
as practical and shall meet all other applicable standards, including lot coverage and
vegetation clearing limitations. In no case shall the structure be located closer to the
shoreline or tributary stream than the principal structure.
NOTE: All tidal land which is subject to tidal action during the highest annual tide is
coastal wetland.
A tributary stream may be perennial or intermittent. Where a tributary stream is present
within the shoreland zone, setback standards from that tributary stream are applicable.
End Note
(2)Principal or accessory structures and expansions of existing structures which are permitted
in the Resource Protection, Limited Residential, and Limited Commercial Districts, shall not
exceed thirty-five (35) feet in height. This provision shall not apply to structures such as
transmission towers, windmills, antennas, and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of
record, or in the absence of these, the flood as defined by soil types identified as recent
floodplain soils. In those municipalities that participate in the National Flood Insurance
Program and have adopted the April 2005 version, or later version, of the F loodplain
Management Ordinance, accessory structures may be placed in accordance with the
standards of that ordinance and need not meet the elevation requirements of this paragraph.
(4) With the exception of General Development Districts located adjacent to coastal wetlands
and rivers that do not flow to great ponds, and Commercial Fisheries/Maritime Activities
Districts, non-vegetated surfaces shall not exceed a total of twenty (20) percent of the
portion of the lot located within the shoreland zone. This limitation does not apply to public
boat launching facilities regardless of the district in which the facility is located.
In a General Development District located adjacent to coastal wetlands, or rivers that do
not flow to great ponds, or in a Commercial Fisheries/Maritime Activities District, non-
vegetated surfaces shall not exceed a total of seventy (70) percent of the portion of the lot
located within the shoreland zone.
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not
limited to the following: structures, driveways, parking areas, and other areas from which
vegetation has been removed. Naturally occurring ledge and rock outcroppings are not
Revision Date: March 6, 2023 Page 18 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
counted as non-vegetated surfaces when calculating lot coverage for lots of record on
March 24, 1990 and in continuous existence since that date.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall{s) is(are) at least 25 feet, horizontal distance, from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland;
(c)The site where the retaining wall will be constructed is legally existing lawn or is a
site eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the base flood elevation on rivers, streams,
coastal wetlands, and tributary streams, as designated on the Federal Emergency
Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard
Boundary Maps, or the flood of record, or in the absence of these, by soil types
identified as recent floodplain soils;
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation.
Where natural ground cover is lacking the area must be supplemented with leaf or
bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide
for effective infiltration of stormwater runoff;
(111) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the
buffer.
Revision Date: March 6, 2023 Page 19 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(6) Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in
areas of steep slopes or unstable soils provided: that the structure is limited to a maximum of
four (4) feet in width; that the structure does not extend below or over the normal high-water
line of a water body or upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A.
section 480-C); and that the applicant demonstrates that no reasonable access alternative
exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within a Wetland.
(1) No more than one pier, dock, wharf or similar structure extending or located below the normal
high-water line of a water body or within a wetland is allowed on a single lot; except that when
a single lot contains at least twice the minimum shore frontage as specified in Section15(A), a
second structure may be allowed and may remain as long as the lot is not further divided.
(2) Access from shore shall be developed on soils appropriate for such use and constructed so
as to control erosion.
(3) The location shall not interfere with existing developed or natural beach areas.
(4) The facility shall be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or
wharf in non-tidal waters shall not be wider than six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending below the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
NOTE: A structure constructed on a float or floats is prohibited unless it is designated to function
as, and is registered with the Maine Department of Inland Fisheries and Wildlife as a
watercraft. End Note
(7) New permanent piers and docks on non-tidal waters shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit
has been obtained from the Department of Environmental Protection, pursuant to the Natural
Resources Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending below the normal high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any district.
(9) Except in the General Development Districts and Commercial Fisheries/Maritime Activities
District, structures built on, over or abutting a pier, wharf, dock or other structure extending
Revision Date: March 6, 2023 Page 20 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
beyond the normal high-water line of a water body or within a wetland shall not exceed
twenty (20) feet in height above the pier, wharf, dock or other structure.
(10) Vegetation may be removed in excess of the standards in Section 15(P) of this ordinance in
order to conduct shoreline stabilization of an eroding shoreline, provided that a permit is
obtained from the Planning Board. Construction equipment must access the shoreline by
barge when feasible as determined by the Planning Board.
(a) When necessary, the removal of trees and other vegetation to allow for construction
equipment access to the stabilization site via land must be limited to no more than twelve
(12) feet in width. When the stabilization project is complete the construction equipment
accessway must be restored.
(b) Revegetation must occur in accordance with Section 15(S).
NOTE: A permit pursuant to the Natural Resource Protection Act is required from the
Department of Environmental Protection for Shoreline Stabilization activities. End
Note
D. Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and
land below the normal high-water line of a water body shall not be included in calculating
land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA or a river flowing
to a great pond classified GPA and one hundred (100) feet, horizontal distance, from the
normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland.
E. Individual Private Campsites
Individual private campsites not associated with campgrounds are allowed provided the
following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
(2) When an individual private campsite is proposed on a lot that contains another principal
use and/or structure, the lot must contain the minimum lot dimensional requirements for
the principal structure and/or use , and the individual campsite separately.
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or
tent platform, shall be set back one hundred (100) feet, horizontal distance, from the normal
Revision Date: March 6, 2023 Page 21 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
high-water line of a great pond classified GPA or a river that flows to a great pond classified
GPA, and one hundred (100) feet, horizontal distance, from the normal high-water line of
other water bodies, tributary streams, or the upland edge of a wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle
shall not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
(5S) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter
in a Resource Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or
land owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with
the State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
F. Commercial and Industrial Uses
The following new commercial and industrial uses are prohibited within the shoreland zone, adjacent
to great ponds classified GPA, and rivers and streams which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms
(S) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10)Petroleum or petroleum product storage and/or sale except storage on same property as
use occurs and except for storage and sales associated with marinas
(11)Photographic processing
(12)Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located, except that in the Commercial
Fisheries/Maritime Activities District parking areas shall be set back at least twenty-five
(25) feet, horizontal distance, from the shoreline. The setback requirement for parking
areas serving public boat launching facilities in Districts other than the General
Development I District and Commercial Fisheries/Maritime Activities District shall be no
less than fifty (50) feet, horizontal distance, from the shoreline or tributary stream if the
Revision Date: March 6, 2023 Page 22 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Planning Board finds that no other reasonable alternative exists further from the shoreline
or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent stormwater runoff from flowing directly into a water body, tributary stream or
wetland and where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river that flows to a great
pond classified GPA, and one hundred (100) feet, horizontal distance from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a freshwater wetland
unless no reasonable alternative exists as determined by the Planning Board. If no other
reasonable alternative exists, the road and/or driveway setback requirement shall be no less
than fifty (50) feet, horizontal distance, upon clear showing by the applicant that appropriate
techniques will be used to prevent sedimentation of the water body, tributary stream, or
wetland. Such techniques may include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief culverts and turnouts placed so as to
avoid sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline or
tributary stream due to an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures within the setback area
shall comply fully with the requirements of Section 15(H)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route
or location is available outside the district. When a road or driveway is permitted in a
Resource Protection District the road and/or driveway shall be set back as far as practicable
Revision Date: March 6, 2023 Page 23 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
from the normal high-water line of a water body, tributary stream, or upland edge of a
wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(T).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in
a manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade (Percent) Spacing(Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular
to the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow
for effective functioning, and their inlet and outlet ends shall be stabilized with
appropriate materials.
Revision Date: March 6, 2023 Page 24 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I. Signs
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, Limited Residential and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs
per premises. In the Limited Commercial District, however, such signs shall not exceed
sixteen (16) square feet in area. Signs relating to goods or services not sold or rendered on
the premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (M.R.S.A. section 420-D) requires a full permit
to be Obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban impaired
stream watershed or most-at-risk lake watershed, or a project with | acre or more of
developed area in any other stream, coastal or wetland watershed. A permit-by-rule is
necessary for a project with one acre or more of disturbed area but less than | acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams) and
less than 5 acres of developed area. Furthernore, a Maine Construction General Permit is
required if the construction will result in one acre or more of disturbed area. End Note
Revision Date: Match 6, 2023 Page 25 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following:
a) clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than one-hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond or the upland edge of a wetland
and
b) a holding tank is not allowed for a first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding
fill extensions, to be constructed no less than one hundred (100) horizontal feet from the
normal high-water line of a perennial water body. The minimum setback distance for a
new subsurface disposal system may not be reduced by variance. End Note
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed
in a Resource Protection District, except to provide services to a permitted use within said
district, or except where the applicant demonstrates that no reasonable alternative exists.
Where allowed, such structures and facilities shall be located so as to minimize any adverse
impacts on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be accomplished
by hand sampling, test boring, or other methods which create minimal disturbance of less than one
hundred (100) square feet of ground surface. A permit from the Code Enforcement Officer shall
be required for mineral exploration which exceeds the above limitation. All excavations, including
test pits and holes, shall be immediately capped, filled or secured by other equally effective
measures to restore disturbed areas and to protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(3) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall
be permitted within one hundred (100) feet, horizontal distance, of the normal high-water
line of a great pond classified GPA or a river flowing to a great pond classified GPA, and
within one hundred (100) feet, horizontal distance from the upland edge of the normal
high-water line of any other water body, tributary stream, or the upland edge of a wetland.
Revision Date: March 6, 2023 Page 26 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Extraction operations shall not be permitted within fifty (S0) feet, horizontal distance, of
any property line without written permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred
(100) cubic yards of materials are removed in any consecutive twelve (12) month period,
ground levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid
waste management rules,Chapters 400-419 of the Department of Environmental
Protection's regulations may contain other applicable provisions regarding disposal of
such materials. End Note
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary, to complete the stabilization
project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources,
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on November 1,
2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,
of a great pond classified GPA or a river flowing to a great pond classified GPA, or within
one hundred (100) feet horizontal distance, of other water bodies, tributary streams, or
wetlands. All manure storage areas within the shoreland zone must be constructed or
modified such that the facility produces no discharge of effluent or contaminated storm
water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond classified GPA; within one hundred (100) feet,
horizontal distance, from other water bodies and coastal wetlands, nor within one hundred
Revision Date: March 6, 2023 Page 27 of 33
Town of Stonington, Maine Shoreland Zoning Ordinance
(100) feet, horizontal distance, of tributary streams and freshwater wetlands. Operations
in existence on the effective date of this ordinance and not in conformance with this
provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond classified GPA;
within one hundred (100) feet, horizontal distance of other water bodies and coastal
wetlands; nor within one hundred (100) feet, horizontal distance, of tributary streams and
freshwater wetlands. Livestock grazing associated with ongoing farm activities, and which
are not in conformance with the above setback provisions may continue, provided that such
grazing is conducted in accordance with a Conservation Plan that has been filed with the
Planning Board.
NOTE: 7 M.R.S.A. section 155 requires a municipality to provide the Commissioner
of Agriculture, Conservation and Forestry with a copy of any proposed ordinance that
impacts farm operations. End Note
O. Timber Harvesting -- (Pursuant to Section 4B) The Bureau of Forestry will administer all
Timber Harvesting Regulations in the Shoreland Zone of the Municipality of Stonington,
Maine.
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending one hundred (100) feet, horizontal distance, inland
from the normal high-water line, except to remove hazard trees as described in Section Q.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water line of a great
pond classified GPA or a river flowing to a great pond classified GPA, or within a strip
extending one hundred (100) feet, horizontal distance, from any other water body, tributary
stream, or the upland edge of a wetland, a buffer strip of vegetation shall be preserved as
follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from
the outer limits of the tree or shrub crown. However, a single footpath not to exceed
six (6) feet in width as measured between tree trunks and/or shrub stems is allowed for
accessing the shoreline provided that a cleared line of sight to the water through the
buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes
of Section 15(P)(2)(b) a "Wwell-distributed stand of trees" adjacent to a great pond
classified GPA or a river flowing to a great pond classified GPA, shall be defined as
maintaining a rating score of 24 or more in each 25-foot by 50-foot rectangular (1250
square feet) area as determined by the following rating system.
Revision Date: March 6, 2023 Page 28 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Diameter of Tree at 4-1/2 feet Above Ground Level (inches) Points
Example below
2-<4in. eee I (4x 1l)= 4
4 <Q UN (2x2)= 4
8-< 12M} (3x4)=12
12 in. or greater.................8 (2x 8)=16
36
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed
stand of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by
50-foot rectangular area.
NOTE: As an EXAMPLE, adjacent to a great pond, if a 25 foot X 50 foot plot contains
four (4) trees between 2 and 4 inches in diameter, two (2) trees between 4 and 8 inches
in diameter, three (3) trees between 8 and 12 inches in diameter, and two (2) trees over
12 inches in diameter, the rating score is:
(4x1) + (2x2) + (3x4) + (2X8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points.
Trees totaling 12 points (36-24 = 12) may be removed from the plot provided that no
cleared openings are created. End Note
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(11) Each successive plot must be adjacent to, but not overlap a previous plot;
(i)Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
(iv)Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15{P)(2)(b) "other natural vegetation" is defined as
retaining existing vegetation under three (3) feet in height and other ground cover and
retaining at least five (5) saplings less than two (2) inches in diameter at four and one
half (4 '4) feet above ground level for each 25-foot by 50-foot rectangle area. If five
saplings do not exist, no woody stems less than two (2) inches in diameter can be
removed until 5 saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three
(3) feet in height and other ground cover, including leaf litter and the forest duff layer,
Revision Date: March 6, 2023 Page 29 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
shall not be cut, covered, or removed, except to provide for a footpath or other permitted
uses as described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
dead or hazard trees results in the creation of cleared openings, these openings shall be
replanted with native tree species in accordance with Section Q, below, unless existing
new tree growth is present,
(f) In order to maintain the vefetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related
equipment operation, within or outside the shoreline buffer, must comply with the
requirements of Section 15P (2).
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond
classified GPA or a river flowing to a great pond classified GPA, and one hundred (100)
feet, horizontal distance from the normal high-water line of any other water body, tributary
stream, or the upland edge of a wetland, there shall be allowed on any lot, in any ten (10)
year period, selective cutting of not more than forty (40) percent of the volume of trees
four (4) inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal
in conjunction with the development of permitted uses shall be included in the forty (40)
percent calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal
and accessory structures, driveways, lawns and sewage disposal areas, exceed in the
aggregate, 25% of the lot area within the shoreland zone or ten thousand (10,000) square
feet, whichever is greater, including land previously cleared. This provision applies to the
portion of a lot within the shoreland zone, including buffer area, but shall not apply to the
General Development or Commercial Fisheries/Maritime Activities Districts.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal
(1) Hazard trees in the shoreland zone may be removed with a CEO permit after consultation
with the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared
opening in the tree canopy greater than two hundred and fifty (250) square feet,
replacement with native tree species is required, unless there is new tree growth
already present. New tree growth must be as near as practicable to where the hazard
tree was removed and be at least two (2) inches in diameter, measured at four and one
half (4.5) feet above the ground level. If new growth is not present, then replacement
Revision Date: March 6, 2023 Page 30 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
trees shall consist of native species and be at least four (4) feet in height, and be no
less than two (2) inches in diameter. Stumps may not be removed.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four
and one half (4.5) feet above ground level in any ten (10) year period, and/or results
in cleared openings exceeding twenty-five (25) percent of the lot area within the
shoreland zone, or ten thousand (10,000) square feet, whichever is greater,
replacement with native tree species is required, unless there is new tree growth
already present. New tree growth must be as near as practicable to where the hazard
tree was removed and be at least two (2) inches in diameter, measured at four and one
half (4.5) feet above the ground level. If new growth is not present, then replacement
trees shall consist of native species and be at least two (2) inches in diameter,
measured at four and one half (4.5) feet above the ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible
without the need for replanting or a permit, as long as the removal does not result in
the creation of new lawn areas, or other permanently cleared areas, and stumps are
not removed. For the purposes of this provision dead trees are those trees that contain
no foliage during the growing season.
(d) The Code Enforcement Officer may require the property owner to submit an
evaluation from a licensed forester or arborist before any hazard tree can be removed
within the shoreland zone.
(e) The Code Enforcement Officer may require more than a one-for-one replacement for
hazard trees removed that exceed eight (8) inches in diameter measured at four and
one half (4.5) feet above the ground level.
(2) Storm-damaged trees in the shoreland zone may be removed with a CEO permit after
consultation with the Code Enforcement Officer if the following requirements are met:
(a} Within the shoreline buffer, when the removal of storm-damaged trees results in a
cleared opening in the tree canopy greater than two hundred and fifty (250) square
feet, replanting is not required, but the area shall be required to naturally re-vegetate,
and the following requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new
lawn areas, or other permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed;
(iii)Limbs damaged from a storm event may be pruned even if they extend beyond the
bottom one-third (1/3) of the tree; and
(iv) If, after one growing season, no natural regeneration or regrowth is present,
replanting of native tree seedlings or saplings is required at a density of one
seedling per every eighty (80) square feet of lost canopy.
Revision Date: March 6, 2023 Page 31 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(b) Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40%
of the volume of trees four (4) inches or more in diameter, measured at four and one
half (4.5) feet above the ground level in any ten (10) year period, or results, in the
aggregate, in cleared openings exceeding 25% of the lot area within the shoreland
zone or ten thousand (10,000) square feet, whichever is greater, and no natural
regeneration occurs within one growing season, then native tree seedlings or saplings
shall be replanted on a one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set
forth in Section 15(P), provided that all other applicable requirements of this chapter are
complied with, and the removal of vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the vegetation standards in
this chapter, such as but not limited to cleared openings in the canopy or fields. Such
areas shall not be enlarged, except as allowed by this section. If any of these areas, due to
lack of removal of vegetation every two (2) years, reverts back to primarily woody
vegetation, the requirements of Section 15{P) apply;
(2) The removal of vegetation from the location of allowed structures or allowed uses, when
the shoreline setback requirements of section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of section 15(N) are
complied with;
(5) The removal of vegetation associated with Brownfields or voluntary response action
program (VRAP) projects provided that the removal of vegetation is necessary for
remediation activities to clean-up contamination on a site in a Commercial Fisheries and
Maritime Activities District or other equivalent zoning district approved by the
Commissioner that is part of a State or Federal Brownfields program or a voluntary
response action program pursuant 38 M.R.S.A section 343-E, and that is located along:
(a) A coastal wetland; or
(b) A river that does not flow to a great pond classified GPA pursuant to 38 M.R.S.A.
section 465-A.
(6) The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the
wheeled or tracked motorized equipment is operated at least twenty-five (25) feet,
Revision Date: March 6, 2023 Page 32 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
horizontal distance, from the shoreline, and stored one hundred (100) feet horizontal
distance, from the shoreline, except that wheeled or tracked equipment may be
operated or stored on existing structural surfaces, such as pavement or gravel;
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the |
shoreline occurs via hand tools; and
(c) If applicable clearing and vegetation removal standards are exceeded due to the |
removal of non-native invasive species vegetation, the area shall be revegetated with
native species to achieve compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the Department
of Agriculture, Conservation and Forestry's Natural Areas Program: |
http://www.maine.gov/dacf/mnap/features/invasive plants/invasives.htm End Note
(7) The removal of vegetation associated with emergency response activities conducted by |
the Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and
their agents.
S. Revegetation Requirements |
When revegetation is required in response to violations of the vegetation standards set forth |
in Section 15(P), to address the removal of non-native invasive species of vegetation, or as a
mechanism to allow for development that may otherwise not be permissible due to the
vegetation standards, including removal of vegetation in conjunction with a shoreline
stabilization project, the
revegetation must comply with the following requirements. |
(1) The property owner must submit a revegetation plan, prepared with and signed by a
qualified professional that describes revegetation activities and maintenance. The plan |
must include a scaled site plan, depicting where vegetation was, or is to be removed, |
where existing vegetation is to remain, and where vegetation is to be planted, including a
list of all vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area |
where vegetation was removed and at a density comparable to the pre-existing |
vegetation, except where a shoreline stabilization activity does not allow revegetation to |
occur in the same area and at a density comparable to the pre-existing vegetation, in |
which case re-vegetation must occur along the same segment of shoreline and as close as |
possible to the area where vegetation was removed: |
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. |
If the activity or re-vegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application. |
|
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
Revision Date: March 6, 2023 Page 33 of 53 |
Town of Stonington, Maine Shoreland Zoning Ordinance
(b) Replacement vegetation must at a minimum consist of saplings;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different
species shall be used;
(d) No one species shall make up 50% or more of the number of trees and saplings
planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to
plant trees and saplings in the same area where trees or saplings were removed, then
trees or sapling must be planted in a location that effectively reestablishes the
screening between the shoreline and structures; and
(f) A survival rate of at least eighty (80) percent of planted trees or saplings is required
for a minimum five (5) years period.
(5) Revegetation activities must meet the following requirements for woody vegetation and
other vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced
with native noninvasive species of woody vegetation and vegetation under three (3)
feet in height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantities and variety sufficient to prevent erosion and provide for effective
infiltration of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3)
different species shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody
vegetation plants; and
(e) Survival of planted woody vegetation and vegetation under three feet in height must
be sufficient to remain in compliance with the standards contained within this chapter
for minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and
provide for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, an area must be
supplemented with a minimum four (4) inch depth of leaf mulch and/or bark mulch to
prevent erosion and provide for effective infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient
to remain in compliance with the standards contained within this chapter for
minimum of five (5) years
Revision Date: March 6, 2023 Page 34 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which
result in unstabilized soil conditions and which require a permit shall also require a written
soil erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or riprap.
(2) In order to create the least potential for erosion, development shall be designed to fit with
the topography and soils of the site. Areas of steep slopes where high cuts and fills may
be required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance, and shall be in operation during all stages of the
activity. The amount of exposed soil at every phase of construction shall be minimized to
reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1)
week from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or
other effective measures. In all cases permanent stabilization shall occur within nine (9)
months of the initial date of exposure.
In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in
order to carry water from a twenty-five (25) year storm or greater, and shall be stabilized
with vegetation or lined with riprap.
Revision Date: March 6, 2023 Page 35 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
U. Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on-
site investigation and be prepared by state-certified professionals. Certified persons may
include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State
Certified Geologists and other persons who have training and experience in the recognition
and evaluation of soil properties. The report shall be based upon the analysis of the
characteristics of the soil and surrounding land and water areas, maximum ground water
elevation, presence of ledge, drainage conditions, and other pertinent data which the evaluator
deems appropriate. The soils report shall include recommendations for a proposed use to
counteract soil limitations where they exist.
V. Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or 11 combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
W. Archaeological Site
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the Nationa! Register of Historic Places,
as determined by the permitting authority, shall be submitted by the applicant to the Maine
Historic Preservation Commission for review and comment, at least twenty (20) days prior to
action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
X. Side Line Setback Requirements
The following requirements for setbacks from side lot lines are required for the following zones:
Resource Protection District 50 Feet
Limited Residential District 20 Feet
Limited Commercial District 10 Feet
General Development | & II District 10 Feet
Commercial Fisheries/ Maritime Activities District 0 Feet
Section 16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or
reappointed annually by July Ist.
Revision Date: March 6, 2023 Page 36 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the
provisions of 30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions
of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first
obtaining a permit, engage in any activity or use of land or structure requiring a permit in the
district in which such activity or use would occur; or expand, change, or replace an existing
use or structure; or renew a discontinued nonconforming use. A person who is issued a permit
pursuant to this Ordinance shall have a copy of the permit on site while the work authorized
by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means
of adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section
14.
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that
the information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
(5) When an excavation contractor will perform an activity that requires or results in more
than one (1) cubic yard of soil disturbance, the person responsible for management of
Revision Date: March 6, 2023 Page 37 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
erosion and sedimentation control practices at the site must be certified in erosion control
practices by the Maine Department of Environmental Protection. This person must be
present at the site each day earthmoving activity occurs for a duration that is sufficient to
ensure that proper erosion and sedimentation control practices are followed. This is
required until erosion and sedimentation control measures have been installed, which will
either stay in place permanently or stay in place until the area is sufficiently covered with
vegetation necessary to prevent soil erosion. The name and certification number of the
person who will oversee the activity causing or resulting in soil disturbance shall be
included on the permit application. This requirement does not apply to a person or firm
engaged in agriculture or timber harvesting if best management practices for erosion and
sedimentation control are used; and municipal, state and federal employees engaged in
projects associated with that employment.
(6) All applications shall require and provide to the municipal permitting authority pre-
construction photographs, and no later than 20 days after the completion of the
development, post construction photographs of the shoreline vegetation and development
Site.
(7) FEES: Applications for permits under this ordinance shall submit a non-refundable fee to
the Town of Stonington at the time of submission of the permit application. The Board of
Selectmen for the Town of Stonington shall have the authority to adopt an equitable and
reasonable fee schedule, which maybe revised from time to time as may become necessary.
D. Procedure for Administering Permits
Within 35 days of the date of receiving a written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either that
the application is a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete. The Planning Board or the
Code Enforcement Officer, as appropriate, shall approve, approve with conditions, or deny all
permit applications in writing within 35 days of receiving a completed application. However,
if the Planning Board has a waiting list of applications, a decision on the application shall occur
within 35 days after the first available date on the Planning Board's agenda following receipt
of the completed application, or within 35 days of the public hearing, if the proposed use or
structure is found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance. After the submission of a
complete application to the Planning Board, the Board shall approve an application or approve
it with conditions if it makes a positive finding based on the information presented that the
proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
Revision Date: March 6, 2023 Page 38 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(5) Will conserve shore cover and visual, as well as actual, points of access to inland and
coastal waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will not adversely affect existing commercial fishing or maritime activities in a
Commercial Fisheries/Maritime Activities district;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall
be stated in writing. No approval shall be granted for an application involving a structure if
the structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting
structure setback requirements, the Planning Board may approve a permit for a single-family
residential structure in a Resource Protection District provided that the applicant demonstrates
that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the base flood elevation along rivers and artificially
formed great ponds along rivers and outside the velocity zone in areas subject to tides,
based on detailed flood insurance studies and as delineated on the Federal Emergency
Management Agency's Flood Boundary and Floodway Maps and Flood Insurance Rate
Maps; all buildings, including basements, are elevated at least one foot above the base
flood elevation; and the development is otherwise in compliance with any applicable
municipal floodplain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the base flood elevation
(4) The total ground-floor area, including cantilevered or similar overhanging extensions, of
all principal and accessory structures is limited to a maximum of 1,500 square feet. This
limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than one hundred (100) feet, horizontal distance. In
determining the greatest practical extent, the Planning Board shall consider the depth of
the lot, the slope of the land, the potential for soil erosion, the type and amount of vegetation
to be removed, the proposed building site's elevation in regard to the floodplain, and its
proximity to moderate-value and high-value wetlands.
F. Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. Ifa substantial start is made within
Revision Date: March 6, 2023 Page 39 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
one year of the issuance of the permit, the applicant shall have one additional year to complete
the project, at which time the permit shall expire.
G. Installation of Public Utility Service
A public utility, water district, sanitary district or any utility company of any kind may not
install services to any new structure located in the shoreland zone unless written authorization
attesting to the validity and currency of all local permits required under this or any previous
Ordinance has been issued by the appropriate municipal officials or other written arrangements
have been made between the municipal officials and the utility.
H. Appeals.
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate
basis, where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision, or determination made by, or failure to act by, the Planning Board
in the administration of this Ordinance; and to hear and decide administrative appeals on
a de novo basis where it is alleged by an aggrieved party that there is an error in any
order, requirement, decision or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application under this
Ordinance. Any order, requirement, decision or determination made, or failure to act, in
the enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth
in this Ordinance.
(2) Variance Appeals Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(1) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
Revision Date: March 6, 2023 Page 40 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals or the Code
Enforcement Officer, if authorized in accordance with 30-A M.R.S.A. section 4353-A,
may grant a variance to an owner of a residential dwelling for the purpose of making that
dwelling accessible to a person with a disability who resides in or regularly uses the
dwelling. The board shall restrict any variance granted under this subsection solely to
the installation of equipment or the construction of structures necessary for access to or
egress from the dwelling by the person with the disability. The board may impose
conditions on the variance, including limiting the variance to the duration of the disability
or to the time that the person with the disability lives in the dwelling. The term
"structures necessary for access to or egress from the dwelling" shall include railing, wall
or roof systems necessary for the safety or effectiveness of the structure. Any permit
issued pursuant to this subsection is subject to Sections 16 (H)(2)(f) and 16(H)(4)(b)Gv)
below.
(ce) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board
of Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider
new evidence and testimony, be it oral or written. When acting in a "de novo" capacity the
Board of Appeals shall hear and decide the matter afresh, undertaking its own independent
analysis of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the
decision was contrary to specific provisions of the Ordinance or contrary to the facts
presented to the Planning Board. The Board of Appeals may only review the record of the
proceedings before the Planning Board. The Board Appeals shall not receive or consider
any evidence which was not presented to the Planning Board, but the Board of Appeals may
receive and consider written or oral arguments. If the Board of Appeals determines that the
record of the Planning Board proceedings are inadequate, the Board of Appeals may remand
the matter to the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
agerieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
Revision Date: March 6, 2023 Page 41 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. Aconcise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(1ii)Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board
of Appeals all of the papers constituting the record of the decision appealed from.
(iv)The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete written
application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(1) The person filing the appeal shall have the burden of proof.
(iii)The Board shall decide all administrative appeals and variance appeals within
thirty-five (35) days after the close of the hearing, and shall issue a written
decision on all appeals.
(iv)The Board of Appeals shall state the reasons and basis for its decision, including
a statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7)
days of the Board's decision. Copies of written decisions of the Board of Appeals
shall be given to the Planning Board, Code Enforcement Officer, and the
municipal officers.
(5) Appeal to Superior Court.
Except as provided by 30-A M.R.S.A. section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take an
appeal to Superior Court in accordance with State laws within forty-five (45) days from the
date of any decision of the Board of Appeals.
(6) Reconsideration.
In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals may reconsider
any decision within forty-five (45) days of its prior decision. A request to the Board to
reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur
and be completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner,
petitioner, planning board, code enforcement officer, and other parties of interest, including
abutters and those who testified at the original hearing(s). The Board may conduct additional
hearings and receive additional evidence and testimony.
Revision Date: March 6, 2023 Page 42 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
I. Enforcement
(1) Nuisances.
Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person responsible for
such violation, indicating the nature of the violation and ordering the action necessary to
correct it, including discontinuance of illegal use of land, buildings or structures, or work
being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be
maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to ensure compliance
with all applicable laws and conditions attached to permit approvals. The Code
Enforcement Officer shall also investigate all complaints of alleged violations of this
Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions
of the office, including applications submitted, permits granted or denied, variances
granted or denied, revocation actions, revocation of permits, appeals, court actions,
violations investigated, violations found, and fees collected.
(3) Legal Actions.
When the above action does not result in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon notice from the Code Enforcement Officer,
are hereby directed to institute any and all actions and proceedings, either legal or equitable,
including seeking injunctions of violations and the imposition of fines, that may be
appropriate or necessary to enforce the provisions of this Ordinance in the name of the
municipality. Such persons shall be responsible for attorney fees and court costs for the
municipality. The municipal officers, or their authorized agent, are hereby authorized to enter
into administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action. Such agreements shall not allow an
illegal structure or use to continue unless there is clear and convincing evidence that the
illegal structure or use was constructed or conducted as a direct result of erroneous advice
given by an authorized municipal official and there is no evidence that the owner acted in
bad faith, or unless the removal of the structure or use will result in a threat or hazard to
public health and safety or will result in substantial environmental damage.
(4) Fines.
Revision Date: March 6, 2023 Page 43 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Any person, including but not limited to a landowner, a landowner's agent or a contractor,
who violates any provision or requirement of this Ordinance shall be penalized in accordance
with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation
each day that the violation continues. However, in a Resource Protection District the
maximum penalty is increased to $5000 (38 M.R.S.A. section 4452) End Note
Revision Date: March 6, 2023 Page 44 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Section 17. Definitions
Accessory dwelling unit - a self-contained dwelling unit located within, attached to or detached
from a single-family dwelling unit located on the same parcel of land.
Accessory structure or use - a use or structure which is incidental and subordinate to the principal
use or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot.
A deck or similar extension of the principal structure or a garage attached to the principal structure
by a roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting
or denial of a permit or variance under this Ordinance; a person whose land abuts land for which a
permit or variance has been granted; or any other person or group of persons who have suffered
particularized injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops, grains and seed crops, dairy animals and dairy
products, poultry and poultry products, livestock, fruits and vegetables, and ornamental and green-
house products. Agriculture does not include forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive
of bark.
Base Flood -- a flood having one percent chance of being equaled or exceeded in any given year,
commonly called the 100-year flood.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft,
and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry -- State of Maine Department of Agriculture, Conservation and forestry,
Bureau of Forestry.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
Coastal Wetland - all tidal and subtidal lands; all lands with vegetation present that is tolerant
of salt water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh,
bog, beach, flat or other contiguous low land that is subject to tidal action during the highest tide
level for the year in which an activity is proposed as identified in tide tables published by the
National Ocean Service. Coastal wetlands may include portions of coastal sand dunes.
NOTE: All areas below the highest annual tide level are coastal wetlands. These
areas may consist of rocky ledges, sand and cobble beaches, mud flats, etc., in addition
to salt marshes and salt meadows. End Note
Commercial use - the use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the buying
and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling
units.
Development -- a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Revision Date: March 6, 2023 Page 45 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a substantial
handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or
psychologist, as well as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles
and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines,
collection or supply systems; and associated storage tanks. Such systems may include towers,
poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals,
hydrants and similar accessories, but shall not include service drops or buildings which are
necessary for the furnishing of such services.
Expansion of a structure - an increase in the footprint of a structure, including all extensions such
as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of
more footprint or ground area devoted to a particular use.
Family - one or more persons occupying a premise and living as a single housekeeping unit.
Floodway -- the channel of a river or other watercourse and adjacent land areas that must
be reserved in order to discharge the 100-year flood without cumulatively increasing the
water surface elevation by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls, plus the horizontal area of any unenclosed portions of a structure such as porches and
decks.
Footprint -- the entire area of ground covered by the structure(s) on a lot, including but not
limited to, cantilevered or similar overhanging extensions, as well as unenclosed structures, such
as patios and decks.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters
tall (approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frost walls, or other base consisting of concrete,
block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state,
the combined surface area is in excess of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence
of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform
to the criteria of this definition.
Revision Date: March 6, 2023 Page 46 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Functionally water-dependent uses - those uses that require, for their primary purpose, location
on submerged lands or that require direct access to, or location in, coastal or inland waters and that
can not be located away from these waters. The uses include, but are not limited to commercial
and recreational fishing and boating facilities, finfish and shellfish processing, fish-related storage
and retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and
boat building facilities, marinas, navigation aids, basins and channels, shoreline structures
necessary for erosion control purposes, industrial uses dependent upon water-borne transportation
or requiring large volumes of cooling or processing water that cannot reasonably be located or
operated at an inland site, and uses that primarily provide general public access to coastal or inland
waters. Recreational boat storage buildings are not considered to be a functionally water-dependent
use,
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed
or increased inland body of water is completely surrounded by land held by a single owner.
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-
A, Section 465-A. This classification includes some, but not all impoundments of rivers that are
defined as great ponds.
Ground cover -- small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree - a tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a
high probability of failure and loss of a major structural component of the tree in a manner that
will strike a target. A normal range of environmental conditions does not include meteorological
anomalies, such as, but not limited to: hurricanes; hurricane-force winds; tornados; micro bursts;
or significant ice storm events. Hazard trees also include those trees that pose a serious and
imminent risk to bank stability. A target is the area where personal injury or property damage
could occur if the tree or a portion of the tree fails. Targets include roads, driveways, parking
areas, structures, campsites, and any other developed area where people frequently gather and
linger.
Height of a structure - the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1!) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no more
than two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
coverage, or increase in height of a structure. Property changes or structure expansions which
either meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing nonconforming structure. Hence, a structure may be expanded
laterally provided that the expansion extends no closer to the water body, tributary stream, or
Revision Date: March 6, 2023 Page 47 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
wetland than the closest portion of the existing structure from that water body, tributary stream, or
wetland. Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10) individuals and
which involves site improvements which may include but not be limited to a gravel pad, parking
area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Institutional -- a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for
public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads serving
more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other
like material from its natural location and to transport the product removed, away from the
extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot
lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential_- a residential structure containing three (3) or more residential dwelling
units,
Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment
of this Ordinance, does not meet the area, frontage, or width requirements of the district in which
it is located.
Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took
effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was
in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation -- species of vegetation listed by the Maine
Department of Agriculture, Conservation and forestry as being invasive in Maine ecosystems
and not native to Maine ecosystems.
Revision Date: March 6, 2023 Page 48 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Normal high-water line (non-tidal waters) - that line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric
soils and that are at the same or lower elevation as the water level of the rivers and great pond
during the period of normal high-water are considered part of the rivers and great pond.
NOTE: Adjacent to tidal waters, setbacks are measured from the upland edge of the "coastal
wetland." End Note
Outlet Stream -- any perennial or intermittent stream, as shown on the most recent highest
resolution version of the National Hydrography Dataset available from the United States
Geological Survey on the website of the United States Geological Survey or the national map,
that flows from a freshwater wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or other
legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or below
the normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than
seven (7) months in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same lot.
Principal use - a use other than one which ts wholly incidental or accessory to another use on
the same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or below the
normal high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than seven (7) months in
any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or more in
any period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same premises.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg Hadley Limerick
Lovewell Medomak Ondawa
Alluvial Cornish Charles
Revision Date: March 6, 2023 Page 49 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Podunk Rumney Saco
Suncook Sunday Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed
for temporary sleeping or living quarters for one or more persons, and which may include a pick-
up camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure,
or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use
as permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that point
at which it provides drainage for a watershed of twenty-five (25) square miles to its mouth.
NOTE: The portion of a river that is subject to tidal action is a coastal wetland. End Note
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Salt marsh - Areas of coastal wetland {most often along coastal bays) that support salt tolerant
species, and where at average high tide during the growing season, the soil is irregularly inundated
by tidal waters. The predominant species is saltmarsh cordgrass (Spartina alterniflora). More open
areas often support widgeon grass, eelgrass, and Sago pondweed.
Salt meadow - Areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of salt marshes or open coastal water, where the soil is saturated during the growing
season but which is rarely inundated by tidal water. Indigenous plant species include salt meadow
cordgrass (Spartina patens) and black rush; common threesquare occurs in fresher areas.
Service drop - any utility line extension which does not cross or run beneath any portion of a
water body provided that:
]. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon
the premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone
wires to existing utility poles, or
b. the extension requiring the installation of new utility poles or placement
underground 1s less than one thousand (1,000) feet in length.
Revision Date: March 6, 2023 Page 50 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
Setback - the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space
or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance,
of the normal high-water line of any great pond or river; within 250 feet, horizontal distance, of
the upland edge of a coastal wetland, including all areas affected by tidal action; within 250 feet
of the upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance,
of the normal high-water line of a stream.
Shoreline -- the normal high-water line, or upland edge of a freshwater or coastal wetland.
Storm damaged tree -- a tree that has been uprooted, blown down, is lying on the ground, or
that remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two
(2) perennial streams as depicted on the most recent, highest resolution version of the national
hydrography dataset available from the United States Geological Survey on the website of the
United States Geological Survey or the national map to the point where the stream becomes a
river or where the stream meets the shoreland zone of another body of water or wetland. When a
stream meets the shoreland zone of a water body or wetland and a channel forms downstream of
the water body or wetland as an outlet, that channel is also a stream.
Structure -- anything temporarily or permanently located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind, or anything
constructed or erected on or in the ground. The term includes structures temporarily or permanently
located, such as decks, patios, and satellite dishes.
Structure does not include fences; and poles and wiring and other aerial equipment normally
associated with service drops as well as guy wires and guy anchors; subsurface waste water
disposal systems as defined in Title 32, section 4201, subsection 5; geothermal heat exchange wells
as defined in Title 32, section 4700-E, subsection 3-C; or wells or water wells as defined in Title
32, section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system -- any system designed to dispose of waste or waste water
on or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not include any discharge system
licensed under 38 M.R.S.A. section 414, any surface waste water disposal system, or any
municipal or quasi-municipal sewer or waste water treatment system.
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tidal waters -- all waters affected by tidal action during the highest annual tide.
Tree -- a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at
four and one half (4.5) feet above the ground, with a more or less definitive crown, and reaching
a height of at least ten (10) feet at maturity.
Tributary stream -- means a channel between defined banks created by the action of surface
water, which is characterized by the lack of terrestrial vegetation or by the presence of a bed,
devoid of topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and
which is connected hydrologically with other water bodies. "Tributary stream" does not include
Revision Date: March 6, 2023 Page 51 of 53
Town of Stonington, Maine Shoreland Zoning Ordinance
rills or gullies forming because of accelerated erosion in disturbed soils where the natural
vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only
applies to that portion of the tributary stream located within the shoreland zone of the receiving
water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone. End
Note
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation
and/or the highest annual tide level, including all areas affected by tidal action. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over
and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Velocity zone ~- an area of special flood hazard extending from offshore to the inland limit of the
primary frontal dune along an open coast and any other area subject to high velocity wave action
from storms or seismic sources.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream
Water crossing - any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - a freshwater or coastal wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
Revision Date: March 6, 2023 Page 52 of 53