Site Plan Review Ordinance
°
Town of Sullivan
SS OC
Sa
June 28, 2021
,
1|Page Site Plan Review 7/12/2021
Z
Contents
Section 1 [mntroduction ..escsccsssssessccscsssssssssesssesseesessessseecesseesesssusssssasaseseessesseresuntansaneseseeseessusissuassansesasessesseed
L.1 Background oo... ccc eccesesseessecssesceseeeecuacsaesecsescscevnsnsavsnsserserensesauseesensensnsesesesseasecstatecerssseessssssrensesA
1.2 PULPOSe .....eeecscsesecctersesceccscescecssssssesesesseeesecaeaessesaacaesacassecaessesensaceasievacsssersesavaeseracnerersessenssarsseesensenerA
Section 2 Authority and Administration... ccc ccseeseccrsersteesenscscescssesesssseessesssecssenseecsenenesisesseseesaeeesssserd
ZL Authority oc cccccccccssssssesessesecsesseresevsecevsccessassessesscsessecsesseseessssecssseeseceesssescsssassasacsscssssesaeseeaeesssseeee
2.2 AGMINIStALION...... ce ccesesseeesesesetscesesenensevensceecsaccesoessenacsesasuaesassessesesseseserseeeecateateaceasaseaesaseaeersseseesateee))
2.3 Reference Maine Statutes... ec cceescsscesceescerceecseerenseseeseceeseenevseveesatsassessrsesssensensenenerseenersesstsesseseesesa)
2.4 Applicable Ordinances ......sssecsecsssseeeneseerecssesessecssneanecsesssnecsncaevecsuessuessaneaneecuneanensnesercsaneessesanecaeesse
Section 3 Applicability... cc cece ccscsscscsseseneesesessecsstaesosssencecusevscesecaeeeeaeseesaesacenseeceesssaseossacaeasnatsesatsaeeseseseO
, 3.1 Applicability ......cccsescccssssssecsssssseccessssesseseesssevesessssvecessessuvecssssssesesesssssescessuseuesstssevecsdasssuseesasssesssarsnseseeO
3.2 EXCeptions ......ccccccssssseseeseesescesseesesscesessevecseseseessssssesscacsevacseesscaesecseseesseesassavacsceacavensesaesassegestscescsenesO
Section 4 Review Procedures 0.0... csesessescesnseresesseneessecserscsssessecenscsesessensscssssecaseesarseeerseneesensecessessesearaneecesseeen D
4.1 Informal pre-application procedure... ccceesecessecsensescseaescseneeseecatscsenseseseacseseneesceesesesensessassenetserensaeee D
4.2 Application Procedures ......ccccessscssseessescsenesscscecsecesesssensesescssseesesseneessesaesesesseesseueessuasstssssseeceseetetsesesee
4.2.1 Application... cccccccesesessesseesereneessteceesersssesscsecarstsscscseesenseenesssseseseeesesssasuersveceasaccssaeseseecatatserassenae D
4.2.2 Approval o.eceececsescsecsecseseesesserseescsssscsscaecsesaensenesscvavseseesssesessensensaseaeseesecaereevecerarseeevsasaseateasenessO
Section 5 Criteria and Standards oo. ccsesessssecsecnecsenesensesecsesseseressesesseesceseceeseeseseucesssaeseaecseaesseeseessesenneD)
5.1 Environmental occ ccccccsecssessesececesssssssseseeseeseecassscecesessesessesssesssacsecasesessesaeseeaesassaeseseenteessessesateeseseeeD)
5.1.1 Air and Water Pollution oo... ci cesesesserecsssnessecsssenssacsareccassacsacsessanscvarrasersesarsrsasssesnesneneeneD
5.1.2 Dust, Fumes, Vapors and Gases .....cccsscssscscsseseserssessescssescsecsecsecscssesscsecaecssesssasseesseseescsesseeseneese
5.1.3 Od OM csecseescereeseresssesessevsevecsevsecsenseseceeevsecessaessssessssessecaessesseeecascasseesessneeescaesessesseseecassacaceaseateeeeeD
S14 Setbacks... cccscsessccessesseneecensssseesssescescsccsccecsenseeascoesssesassessncecssenevascneserensessssescasesserssesssnsseneaeeeD
5.1.5 Hazardous Material 0... ccc ceccesesseceesceccescesecscsevscssssessscsesseseesscsenesecsavaecassaseessessssssesseseseeesee LO
5.1.6 Soil Erosion oo... eeeeecescescesesseeseeesesencceeasesesacsecsevseseesecsseesavsscsessenecsecseceseessseaesssseeeessesesssssasseeasereeee LO
5.1.7 Scenic and Natural Beauty oo... ec scessesseseesscesceseceesessssescceseseeeacesassessseesesseeeesasarscestersateeseeee LO
5.2 Traffic Comgestion.......cceecccsesseseesseesescssesseeseecsesseesseerseassessssssssersrsesecsesesescsesecsessseresesseasseneeesseseeee LO .
5.3 Solid Waste and Sewage Waste Disposal .........ccccecsscescsesseecsessseeeeseeesseseececaesenasseestaceseteresteteeseree LO
5.4 Comprehensive Plai...cccecccccsceceeneresseseresnecestecseseessssssecesseneceseesessececseseeseaesesssacseeatsceessteessserereseee 1
5.5 100 Year Flood Elevation oo... ccscsessseeseccesessessseececsscaececcsscsacessereeescesseseseeseesateeseesasenesseeaeeesseeees LO
5.6 Relationship of Structure to the Environment 0... cc cece cseeeeseeceeesesesersererseretseseneaseeeeseesseeteerees LO
5.7 Exterior Lighting oc. sseseccenceesesensesessnscsceecsececeseesseeeseseescecassecqeaeseesensensseeesstersetstsevsevateseseeteeeee lL :
5.8 NOISC.....cecccsssseceesevesvsceseteessessesssseseseveesessssessssasedevsseccsesssssesesaesassecsesaeeaescsaeaesassessessesatsessessessecssessseeee db
5.10 Communication TOWers 0... ccccecstesecesscesscsceseeveessenseseseessaenecoesesseqesaesoeseessaessessessteesesatsersssessesnees L2
5.11 Building Height oo. sssesssesssscesssescsssesseecnecseecsesesseseesecetsessnssecetseessoesesecersetstsatacsecareese LQ
2|Page Site Plan Review 7/12/2021
Z
5.12 Lot Coverage .....ccceccsecsssesesssserseserseneveeeesevsceeasersescsessensersaesarsessssestvacescsesssusasseveesessrsensessaeaesesesensees LD
5.13 Hours of Operation .....c.cccsccssesssesssessecssecssssssesessscssvcsvessscssessssssesssesecsucesecsecsusstessessnssusensearessesneeereeee 13
5.14 Required Maintenance........cccecscsssesseesesessssessresssesescscessesensesersssaserseseesesseasseessesssereerseersessnserere LS
5.15 State Regulations........ccccecccecescceeesesesesscesesenseseesesseeesesessscseavenveversesessecaeassetssaceesstenscsssssessessassasesesens LO .
5.16 Performance Conditions .......cececececscessseesesceseseseeeesescecescucesssasoesenacseusesereesersesseeeesassarsersassssssasureseneer LO
5.17 General Conditions......c.ccscscssesesessescsesssscesseeseseesesessesensesceecseseesesceseneescacseenensersersasertaseeescersetseeecaneasee LO
5.18 Road Entrance Standards... cccesceessenssessseeseeseensecesceeseeseescearsesasscssescsseseeseevsesesssessssersssersesstenses LO
5.19 Performance Guarantees.......ccccssccssssesssssssssesssssssessesssssseesesssevecsessessessssssvesecrssseesessseseestssueeesssssseseeees 14
Section 6 Ordinance Validity and Violations ......cccscseesecsssessetensrerseteesersecarserenstsesserersenseensesecsseseersnseessenee LO
6.1 Validity and Severability and Conflicts with other Ordinances 0.0.0... ceeseeesceessceeeteesetstsessesesee LO
6.2 Appeals .....eeecccceccescssssseseesesesssesseesenenecscssessseesenevscasesecescarscasestscncsssasansnsessasesescecseransessarsetseesrteceteseecseete LO
6.3 Violations .o.cccceccccccsscscssesssesucsesecsessevenceseceeessessesssesecencesssaeesseaecoucasesseseeccesseessssenvarsarseetensneacearetenaeaees LO
Section 7 Definitions .........cccccccccsssscccssssscesesseseseescsensecensesceeeessesecseseeseesssceneeserseseceesesersesseeseaseesenseearseseavseeeee 16
7.1 Meaning Of Words.......ccccsecccssseseessescesseseesesecanvececcessenseccssesssasaerevecserauscsssersesessescessssatsecseesesserseseeseees LO
7.2 List Of Definitions ........cccccceccessseeesesceceseesecesecsescsseaseceaesceesaccceseuscscenesstseesssessassesestatssseeeseasersesenssseenaees LO
Appendix A Site Plan Review Application .......c.ccccccscsesesecsesesesnsesssssscsesesscscssscucsesesvenessscssevsnessussseeseaneeess DO)
,
3|Page - Site Plan Review a 7/12/2021
|
Section 1 Introduction
1.1 Background
Development or changes in the uses of land or buildings can cause an impact on the cost and
efficiency of municipal services, on the environment of the Town and may impact existing
residential uses. Such development can have impacts on schools and other public utilities;
recreational facilities; liquid and solid waste disposal; fire protection; open space; road systems
and circulation; traffic congestion; placement of buildings and structures; property values; water
quality; the visual characteristics of the neighborhood and Town; historic and archaeological
resources; and the general health, safety, and welfare of the community.
The Town of Sullivan recognizes the American Disabilities Act (ADA) and will ensure
compliance for all applicants.
1.2 Purpose
The purpose of this Ordinance is to minimize impacts caused by commercial, industrial,
institutional and municipal development and to accomplish the following objectives with the
least possible regulation:
1. To establish a fair and reasonable set of standards for impartial evaluation ofeach
development plan
2. To provide local protection from nuisances that aregoverned by Maine Revised Statutes
Annotated (MRSA) Title 17, Chapter 91 [1] .
3. To suggest ways in which development plans could be modified so that potential
problems could be minimized or prevented
4. To balance the right of landowners to use their land for their own purposes with the
corresponding right of abutting and neighboring landowners to live without undue
disturbance from nuisances, traffic, storm water run-off or the pollution of ground or
surface water resources
5. To protect property values
6. To preserve the unique local, historic and scenic aspects of the Town of Sullivan
7. To minimize problems created by development that would increase the cost of
maintaining or improving municipal facilities for projects that do not contribute to growth
for the benefit of the Town of Sullivan
8. To provide a Public Hearing process through the Planning Board when Town Residents
canraise questions and receive answers about how new development proposals could
affect them; if necessary, a vote for or against the development proposal shall be taken
for the Town Residents attending the Planning Board meeting and recorded as a public
recommendation to the Planning Board
?
4|Page Site Plan Review 7/12/2021
:
Section 2 Authority and Administration
2.1 Authority
This Ordinance is adopted pursuant to the Home Rule Power of Article VIII, Part 2, of the
Maine Constitution and 30-A MRSA, Section 3001 [2].
2.2 Administration
The Sullivan Planning Board shall administer this Ordinance.
2.3 Reference Maine Statutes
1) MRSA Title 17 Chapter 91 -- Nuisances
2) MRSA Title 30-A Section 3001 -- Home Rule
3) MRSA Title 30-A Section 2691 -- Board of Appeals
4) MRSA Title 30-A Section 4452 - Enforcement of land use laws and ordinances
5) MRSA Title 30-A Section 4201, Subsection 5 -- Wastewater Disposal Systems
6) MRSA Title 32 Section 4700-E, Subsection 3-C -- Geothermal heat exchange wells
7) MRSA Title 32 Section 4700-E, Subsection 8 -- Wells or water wells
2.4 Applicable Ordinances
1) Shoreland Zoning Ordinance -- all development, business and residential,
in shoreland zone
2) Sign Ordinance -- ail installation of signs for business or home business
3) 911 Ordinance -- aid rapid identification of properties for essential
services
?
5|Page Site Plan Review 7/12/2021
i
Section 3 Applicability
3.1 Applicability
This Ordinance shall apply to proposals for change of use of a property, including change of
intensity or type of use, including commercial, industrial, institutional and municipal. Some
examples of change of use are listed below:
1. Proposals for new construction of non-residential buildings or structures including
campgrounds, multi-family housing, hospitals and medical facilities, manufacturing
facilities, hotels and motels, automotive/vehicle repair facilities, gas stations, retail stores,
fisheries, mobile food services and subdivisions in all cases accessory buildings and
structures
2. Proposals for the resumption of or non-conforming uses which have been discontinued
for a least one (1) year
3. Gravel, rock and mineral extraction including proposals for changes to existing pits and
quarries whether approved or grandfathered; Planning Board review shall be required
under this Ordinance if any ofthe following conditions apply:
a. Gravel pits shall be limited to a maximum of five (5) acres; the amount to be
reclaimed shall be determined per this ordinance before any additional contiguous
area can be opened or topsoil removed
b. Existing permitted pits/quarries that are sold or there is a transfer of ownership or
operation shall be subject to review before the anniversary date of the original Site
Plan approval to determine that they are operating within the previous permitted
use guidelines by Site Plan Review
c. A change of the reclamation plan
d. A change in business plan which increases the activity in the pit or the number of
yards removed by 25% or more
e. Quarries, quarrying or quarry type activities shall be reviewed under this ordinance
4. Wind Farms -- no Wind Farm towers shall be higher than one hundred (100) feet and the
Wind Farm shall be no larger than five (5) acres
5. Solar Farms -- commercial solar farms shall be limited to five (5) acres unless approved
by the Planning Board under special circumstances of solar farm location which does not
impact abutters.
3.2 Exceptions
This ordinance does not apply to home occupations or forest land management practice.
This ordinance does not apply to agricultural uses except for commercial growing of marijuana.
?
6|Page Site Plan Review 7/12/2021
|
Section 4 Review Procedures
4.1 Informal pre-application procedure
Prior to submission of a formal application, applicants should present a sketch of the
development plan to the Code Enforcement Officer (CEO) or the Planning Board. The CEO or
Planning Board may offer suggestions toward the drafting of formal plans and review with the
applicant the appropriate information required for the project. The sketch plan shall show the lot
number and appropriate tax map for reference.
4.2 Application Procedures
4.2.1 Application
The applicant shall submit a Site Plan Review to the Planning Board. The Site Plan
application is shown in Appendix A. The application shall include the following items and shall
include an applicable fee per the current fee schedule available at the Town Office:
e Seven (7) copies of a formal Site Plan Review application.
e Seven (7) copies of a map showing the following information and drawn to a scale of not
more than 100 feet to the inch and not less than 40 feet to the inch on standard 24 inch by
36-inch paper: Information provided on this drawing should include the following:
e Name and address of applicant and development
e Scale and true or magnetic north indicator
e Total land area of the site
¢ Location of development on the site
e Location of watercourses, marshes or bedrock on the site
e Existing soil conditions as described by either a soil scientist, geologist, engineer,
or Soil Conservation Service medium intensity soil survey
e Location of proposed public utilities, culverts, wells and leach fields.
e Location of fencing, screening or landscape work
e Contour lines may be required and specified by the Planning Board showing
elevations in relation to mean sea level
e Municipal tax map and lot numbers and names of abutting landowners shown on
map
e The Planning board may also require an updated survey completed bya licensed
Maine surveyor or engineer
e State of Maine Department of Environmental Protection (DEP) Permit by Rule
e Seven (7) copies of a site location map drawn to a scale of not more than 100 feet and not '
less than 40 feet to the inch to fit on standard 24 inch by 36-inch paper showing the .
following information:
e Exact dimensions and acreage of parcel
¢ Location of all buildings within 300 feet of the property boundaries
e Location of all other structures, wells, sewer systems, water bodies and easements,
drainage ways, public and private water ways and roads within 300 feet of the
7|Page Site Plan Review 7/12/2021
z
boundary lines
e The size, shape and location of existing and proposed buildings on the parcel
e Location and dimensions of on-site pedestrian and vehicular access ways, parking
areas, loading and unloading facilities and design of ingress and egress of vehicles
to and from the site onto public streets
e Traffic impact of proposed development
e The applicant shall attend a meeting of the Planning Board todiscuss the application and
all supporting data requested.
e Upon determining that a complete application has been submitted forreview and
appropriate fees have been paid, the Town shall issue a dated receipt.
e The Planning Board shall initiate a public hearing on all applications within 60 days of
submitted application.
e The Planning Board shall initiate notification of all landowners within 500 feet from
applicant's property lines.
e The Planning Board may solicit written comments from the Select Board, Fire Chief,
Town Manager and CEO on the impact of the proposed development.
e Before the Planning board gives final approval, the applicant must meet the performance
guarantees contained in Paragraph 5.19.
4.2.2 Approval
Within sixty (60) days after submission of a completed application (dated receipt), the
Board shall act to approve, approve with conditions, or disapprove the Site Plan application
submitted and amended, if necessary. The time limit for review may be extended by mutual
agreement between the Planning Board and the applicant. In respect to all review criteria, the
burden of proof rests with the applicant.
,
8|Page Site Plan Review 7/12/2021
|
Section 5 Criteria and Standards
Before granting approval of any Site Plan Review application, the Planning Board shall
consider the following criteria and shall determine that the proposed activity is in accordance
with the provisions of this Ordinance.
5.1 Environmental
Protection of the environment is an important consideration for approval of any development
plans and applicants should refer to the State of Maine DEP Best Management Practices web site (Best
Management Practices: Water Resources: Forest Policy and Management: Maine Forest Service: Maine
ACF). For example, Volume III of the series Protecting Maine's Natural Resources suggests the
following:
"The standard erosion control measures listed below, also referred to in this guidance document as BMPs
(Best Management Practices), are designed for your use wherever appropriate and practical for your
project. The DEP developed these measures to assist you in developing an Erosion & Sedimentation
Control Plan (ESC), when required. You can avoid developing a custom ESC plan for your project if you
agree to follow them."
The following paragraphs establish environmental standards for the Town of Sullivan.
5.1.1 Air and Water Pollution
No land use or establishment shall result in undue water or air pollution either on or off
the site as defined in the following subparagraphs (5.1.1, 5.1.2 and 5.1.3). In making this
determination, the Planning Board shall consider the following: the elevation of the site above
sea level and relation to the flood plain; the nature of soils and sub-soils on the site to adequately
support waste disposal; and the slope of the site. Adequate provision shall be made for surface
drainage so that removal of surface water will not adversely affect neighboring properties. The
site shall have sufficient water available for the foreseeable needs of the development including,
but not limited to, potable water and fire control water. The Plan shall not, alone or in conjunction
with other activities, adversely affect the quality or quantity of the ground water. The plan shall
not cause an unreasonable burden on existing water supplies including private ground water.
5.1.2 Dust, Fumes, Vapors and Gases
No land use or establishment shall be permitted to cause the emission of dust, dirt, fly ash,
fumes, vapors or gases. All planned activities shall also comply with applicable Federal and
State regulations.
5.1.3 Odor
No land use or establishment shall be permitted to produce offensive or harmful odors
perceptible beyond their lot lines, either at ground or habitable elevation. ,
5.1.4 Setbacks
AJl State mandated setbacks from wells, water bodies, wetlands and public water supplies
shall be maintained. Property line setbacks shall be twelve (12) feet from boundary lines.
Setbacks from right of ways shall be seventy-five (75) feet from the centerline of the roadway.
9|Page Site Plan Review 7/12/2021
i:
5.1.5 Hazardous Material
The use of hazardous material shall hot be allowed unless approved by the Planning
Board and monitored by the CEO. Any hazardous material in use shall be stored in containers to
prevent spilling of the material.
5.1.6 Soil Erosion
No land use or establishment shall cause unreasonable soil erosion or reduction in the
capacity of the land to hold water so that a dangerous or unhealthy condition may result both on
and off site. Until a disturbed area is stabilized, sediment in running water shall be trapped with
debris basins, sediment basins, silt traps, or other acceptable methods as determined by the
Planning Board. The top ofa cut or the bottom of a fill section shall not be closer than twelve (12)
feet to an adjoining property. Extraction operations (sandpits, rock quarries, etc.) shall not be
permitted within sixty (60) feet of any property line.
5.1.7 Scenic and Natural Beauty
The proposed plan shall not have an undue adverse effect on the scenic or natural beauty
of the area, aesthetics, historic sites or rare irreplaceable natural areas.
5.2 Traffic Congestion
The proposed plan shall not-cause unreasonable highway or public road congestion or
unsafe conditions with respect to use of the highways or public roads existing or proposed both
on and off site. The proposed site shall provide for safe entrances and exits. The applicant shall
obtain all necessary MDOT permits required.
5.3 Solid Waste and Sewage Waste Disposal ,
The applicant shall provide for the adequate disposal of all solid and liquid wastes in an
environmentally safe manner. An HHE-200 shall be submitted for the Site Plan application to be
complete. The Town of Sullivan shall not accept any applications involving medical, chemical,
industrial or plastic waste.
5.4 Comprehensive Plan
The proposed plan shall be in conformance with the Town of Sullivan Comprehensive
Plan.
5.5 100 Year Flood Elevation
All principal structures within the development, located within designated Flood Hazard
Areas, shall be constructed with the lowest floor, including the basement, at least one (1) foot
above the 100-year flood elevation. '
5.6 Relationship of Structure to the Environment
Proposed structures shall relate harmoniously to the land and existing buildings. Special
attention shall be paid to the bulk, location and height of buildings. In historical areas, the
Planning Board may require new construction to harmonize with surrounding properties to be
designed so as not to be architecturally incompatible. Exposed storage areas, service areas, utility
10|Page Site Plan Review 7/12/2021)
a '
buildings and similar structures shall be screened. Commercial uses, exposed storage areas, utility
buildings shall establish a buffer zone appropriate for the activity to screen visually the uses
year-round.
5.7 Exterior Lighting
To preserve enjoyment of the night sky and to reduce light pollution, glare, and offensive
lighting, all new residential and commercial outdoor lighting shall be regulated by the following
standards:
A. Pole-mounted lights shall not be placed higher than fifteen (15) feet at private
residences and not higher than thirty (30) feet in commercial areas and shall be directed
downward.
B. Building-mounted lights shall not be placed higher than thirty (30) feet and shall be
directed downward.
5.8 Noise
Excessive noise at unreasonable hours shall be required to be muffled so as not to be
objectionable due to intermittence, beat frequency, shrillness, or volume as shown in Table 1. The
maximum permissible sound pressure level of any continuous, regular or frequent source of
sound produced by any commercial or industrial activity regulated by this Ordinance shall be as
established by the time period and type of land use listed in Table 1. Sound pressure levels shall
be measured on a sound level meter at all major lot lines of the proposed site, at a height of at
least four (4) feet above the ground surface.
Table 1 Sound Pressure Level Limit
Sound Pressure Level Limit
PE TAM to 7PM 7PM to 7AM
Residential 45 dB
45 dB
65 dB 55 dB
Industrial 70 dB 60 dB
Note: Fifty (50) decibels (dB) is the level of noise of a quiet conversation at home or a quiet
stream. Seventy (70) dB is the noise level of a vacuum cleaner. The sound of breathing is
about 10 dB. City traffic is 85 dB.
The following uses and activities shall be exempt from the sound pressure level ;
regulations: temporary noises created by construction, timbering or agriculture. '
5.9 Signs
Identification signs mandated by government agencies such as 911 address, etc. are exempt
from this Ordinance. Also exempt are signs with names of streets, owner, occupant, property name,
home occupation, temporary real estate, business, construction or political yard signs which do
11|Page Site Plan Review 7/12/2021
| .
not exceed 12 square feet per side. All other freestanding signs require a permit from the CEO.
The maximum square footage of any freestanding sign, or signs when more than one (1)
sign is permitted, shall not exceed a total of sixty-four (64) square feet per side. Signs shall be
placed such that sight distance along a public way is not obstructed. Internally illuminated signs
that blink, flash, change color or brightness and neon signs are not permittable. All signs must be
maintained in good condition or removed per order of the CEO if not repaired within thirty (30)
days after notice.
5.10 Communication Towers
Communication towers exceeding thirty-six (36) feet in height may be permitted subject to the
following standards:
1. Lot size: the minimum lot size shall be in conformance for lot sizes established in the
Town of Sullivan for residential structures.
2. The structure is not within a Shoreland Zone.
3. The structure is placed on the lot so that its minimum setback from all lot lines, occupiable
structures and rights-of-way is equal to its height.
4. All State and Federal permits have been obtained prior to the issuance of the building
permit, including but not limited to FAA and ECC approvals.
5. Confirmation by a registered structural engineer that the structure's design meets the
minimum wind and structural loads as established in the Uniform BOCA Code or more
stringent Federal, State or local code which appropriately applies to the project.
6. The permit application shall include the construction of lockable security fences around
the structure which shall be designed to prohibit unauthorized access to the tower.
7. An antenna may be added to an existing local tower, provided that a permit is issued by
the Town, and the applicant presents documentation confirming that the proposed
application complies with all State and Federal FCC requirements.
The Planning Board shall advertise and hold a public hearing and shall inform the known
abutting property owners in writing of such meeting, prior to the issuance of any building permit
to allow the public an opportunity to comment on the proposal's conformance to the standards
enumerated above.
The Planning Board shall approve the permit when it determines that the applicant conforms
to the standards enumerated above unless any person presents factual evidence that the proposal .
otherwise violates the public health, safety, or welfare.
The applicant shall be given an opportunity to modify the proposal prior to final action by the
Planning Board if any such evidence is presented.
,
5.11 Building Height
Buildings shall be limited in height to thirty five (35) feet.
5.12 Lot Coverage
Building footprints, accessary building footprints and impervious surfaces shall cover no more
than 35% of the total lot size unless approved by the Planning Board.
12|Page Site Plan Review 7/42/2021
|
5.13 Hours of Operation
Hours of operation shall be within the time from 7:00 AM to 10:00 PM unless the particular
business requires extended hours of operation with the approval of the Planning Board.
5.14 Required Maintenance .
All buildings, grounds, or parts thereof shall be maintained to prevent unsafe or
unsanitary conditions. Liability for on-going maintenance is the responsibility of the current
property owner.
5.15 State Regulations
All plans shall be in conformance with all applicable Maine State regulations.
5.16 Performance Conditions
All site plans shall include a vegetation plan. All plans shall mix planting of grass,
flowers, bushes and trees for the enhancement of the beauty of the Town of Sullivan.
5.17 General Conditions
The Planning Board may modify or waive any of the above application requirements or
performance standards when the Planning Board determines that, because of special
circumstances of the site or the size of the project such application requirements or standards
would not be applicable or would be an unnecessary burden upon the applicant and not adversely
affect the abutting landowners and the general health, safety and welfare of the Town.
Approval of the site plan and any building permit issued for development within the scope
of this Ordinance shall expire after a period of twelve (12) months if construction has not been
substantially commenced.
The Planning Board may, for the purposes of this Ordinance, require additional
conditions necessary to protect the public interest and to fit harmoniously within neighborhoods.
The Planning Board may impose such reasonable conditions on approvals granted under this
Ordinance as it may deem necessary or appropriate to further the applicant's compliance with the
review criteria or other provisions of this Ordinance. Such conditions may include, but are not
limited to, specifications for the following: increased setbacks and yards; adequate water
supplies; type of vegetation; landscaping and planting screens (vegetative buffers); fences; post
development slopes; property reclamation; periods and methods of operation; routing of traffic;
and performance guarantees. Such conditions imposed, and the reasons for these conditions,
shall be written as part of those permits issued by the Planning Board.
5.18 Road Entrance Standards ,
No person shall access any public way, including Town Roads, unless the :
proposed access is approved by the Road Commissioner. Entrances shall meet State
standards of a minimum of 32' wide to a maximum of 40' wide for a Business, and a
minimum 50' to 55' wide for Municipal use, such as Fire Station, Salt/sand Building road
and/or Schools. If the Road Commissioner requires the installation of a culvert to access
a public way or town road, the culvert shall meet the State minimums of 15 inches for
13|Page Site Plan Review 7/12/2021
|
intermittent flow and 18 inches for big water flow unless the depth needed is
unobtainable. The culvert shall be new black plastic.
5.19 Performance Guarantees
The final plan shall be accompanied by a performance guarantee at the discretion of the
Select Board and Town Manager. The performance guarantee shall be an amount adequate to
cover the total construction costs ofall required improvements for roads, utilities, sewage
collection and other improvements and for all infrastructure to be used publicly or privately
maintained and used in common. The performance guarantee shall be in the form of a certified
check payable to the Town of Sullivan.
,
14|Page Site Plan Review 7/12/2021
|
Section 6 Ordinance Validity and Violations
6.1 Validity and Severability and Conflicts with other Ordinances
Should any section or provision of this Ordinance be declared by the courts tobe invalid,
such decision shall not invalidate any other section or provisions of this Ordinance.
Whenever the requirements of this Ordinance differ from the requirements of any other
lawfully adopted rules, regulations, ordinances, deed restrictions or covenants the most restrictive
or that imposing the higher standard shall govern.
6.2 Appeals
The decision of the Planning Board may be appealed to the Board of Appeals within
thirty (30) days of that decision by the applicant and any abutting or affected landowner. The
basis of any such appeal shall be limited to misapplication, misconstruction, or misinterpretation
of the Ordinance. The Board of Appeals hearing shall be appellate and not de novo. The Board
of Appeals may reverse the decision of the Planning Board only upon a finding that there has
been an error of law or fact or that interpretation of law or fact by the Planning Board was in
error. In making its review, the Board of Appeals shall conduct a public hearing in accordance
with Title 30-A, MRSA Section 2691 [3].
6.3 Violations
All violations by any person, including but not limited to a landowner, a landowner's
agent or a contractor who orders or conducts any activity in violation of this Ordinance, shall be
considered a nuisance and constitute a land use violation and shall be prosecuted and penalized in
accordance with Title 30-A MRSA Subsection 4452 [4].
,
15|Page Site Plan Review 7/12/2021
|
Section 7 Definitions
7.1 Meaning of Words
All words not defined herein shall carry their customary and usual meanings. Words used in the
present tense shall include the future. Words used in the singular shall include the plural.
7.2 List of Definitions
ABUTTING PROPERTY: Any lot which is physically contiguous with the subject lot even if
only at a point and any lot which is located directly across a street or right-of-way from the
subject lot such that the extension of the side lot lines of the subject lot would touch or enclose
the abutting property.
ACCESSORY BUILDING: A detached, subordinate building, the use of which is clearly
incidental and related to that of the principal building or use of the land, and which is located
on the same lot as that of the principal building or use.
ACCESSORY STRUCTURE OR USE: A use or structure which is incidental and
subordinate the principal use of the lot. A deck or similar extension of the principal structure
or a garage attached to the principal structure by a roof or a common wall is considered part of
the principal structure.
BUILDING: Any permanent structure, having one or more floors and a roof, which is used for
the housing or enclosure of persons, animals or property. When a division wall without opening
thereof separates any portion, then each such portion shall be deemed a separate building.
BUILDING FOOTPRINT: The area covered by a building measured from the exterior surface
of the exterior walls at grade level exclusive of cantilevered portions of the building. Where the
building is elevated above grade level on posts or similar devices, the building footprint is the
area the building would cover if it were located at ground level.
CHANGE FROM ONE CATEGORY OF NONRESIDENTIAL USE TO ANOTHER
CATEGORY OF NONRESIDENTIAL USE: A change in the type of occupancy of a
nonresidential building or structure, or a portion thereof, such that the basic type of use is
changed, such as from retail to office or storage to a restaurant, but not including a change in the
occupants.
DEVELOPMENT: A change in land use involving alteration of the land, water or vegetation,
or the addition or alteration of structures or other construction not naturally occurring. ,
DWELLING UNIT: Any part of a structure which, through sale or lease, is intended for
human habitation, including single-family and multifamily housing, condominiums, apartments
and time-share units.
EXPANSION OF A STRUCTURE: An increase of the building footprint and/or increase in
16|Page Site Plan Review 7/12/2021
E -
the height of the structure beyond its present highest point. Alterations of existing buildings
which are required in order to meet the requirements of the Americans with Disabilities Act
(ADA) and/or the State Fire Code are not considered to be-expansions of a structure and arc not
required to meet otherwise applicable setback requirements, provided the alterations are the
minimum necessary to satisfy the ADA and/or State Fire Code.
EXPANSION OF USE: Any intensification of use or function, even if not resulting from an
increase in the footprint, height, floor area, land area or cubic volume occupied by a particular
use. Increases which are required to meet the requirements of the Americans with Disabilities
Act and/or the State Fire Code are not considered to be expansions of use.
FISHERIES: Areas identified by a governmental agency such as the Maine Department of
Inland Fisheries and Wildlife or Maine Department of Marine Resources (DMR) as having
significant value as fisheries and any areas so identified in the municipality's comprehensive
plan.
FLOOR AREA: The sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls, measured from the interior side, excluding non-functional attics.
GROUNDWATER: All of the water found beneath the surface of the ground. For purposes of
aquifer protection, this term refers to the subsurface water present in aquifers and recharge
areas.
HEIGHT OF A STRUCTURE: The vertical distance between the average final grade
immediately proximate to the building's foundation and the highest point of the structure,
including signs, but excluding chimneys, steeples, antennas, and similar appurtenances that
have no floor area.
HISTORIC OR ARCHAEOLOGICAL RESOURCES: Areas identified by a governmental
agency such as the Maine Historic Preservation Commission as having significant value as
an historic or archaeological resource and any areas identified in the municipality's
comprehensive plan.
HOME OCCUPATION: An occupation or profession which is carried out on or in a residential
structure, accessory structure or property by the occupants of the dwelling.
IMPERVIOUS SURFACE: The area covered by buildings and associated constructed facilities,
areas which have been or will be covered by a low-permeability material, such as asphalt or
concrete, and areas such as gravel roads and unpaved parking areas, which have been or will be
compacted through design or use to reduce their permeability. Common impervious surfaces ,
include, but are not limited to, rooftops, walkways, patios, driveways, parking lots or storage
areas, concrete or asphalt paving, gravel roads, packed earthen materials, and oiled, macadam,
or other surfaces which similarly impede the natural infiltration of stormwater.
MOBILE FOOD SERVICE: Food Service establishments in mobile units, either towed or self-
propelled registered vehicles, preparing and serving food products on a particular site, open to
17|Page Site Plan Review 7/12/2021
|
the public.
UNIQUE NATURAL AREAS: Areas identified by a governmental agency as having
significant value as a natural area and any areas identified in the municipality's comprehensive
plan.
PRINCIPAL STRUCTURE: Any building or structure in which the main use of the premises
takes place.
PRINCIPAL USE: The primary function of the said building or land.
RECHARGE AREA: Area composed of permeable, porous material through which
precipitation and surface water infiltrate and directly replenish groundwater in aquifers.
SETBACK, FRONT: An open area extending the entire width of a lot from lot sideline to lot
sideline and extending in depth at a right angle from the street right-of-way to such depth as
specified. Such area shall be unoccupied and unobstructed by any building from the ground
upward.
SETBACK, REAR: An open area extending the entire width of a lot from lot sideline to lot
sideline and extending at a right angle from the rear property line of such lot to such depth as
specified. Such area shall be unoccupied and unobstructed by any building from the ground
upward.
SETBACK, SIDE: An open area extending along each sideline ofa lot between the front
setback and the rear setback on such lot and extending at a right angle from the sidelines of
such lot to such depth as specified. Such area shall be unoccupied and unobstructed by any
building from the ground upward.
STRUCTURE: Anything temporarily or permanently located, built, constructed or erected for
the support, shelter or enclosure of persons, animals, goods or property of any kind, or anything
constructed or erected on or in the ground. The term includes structures temporarily or
permanently located, such as decks, patios, and satellite dishes. Structure does not include
fences; poles and wiring and other aerial equipment normally associated with service drops,
including guy wires and guy anchors; subsurface waste-water disposal systems as defined in
Title 30-A MRSA, Section 4201, subsection 5 [5]; geothermal heat exchange wells as defined in
Title 32 MRSA, Section 4700-E, subsection 3-C [6]; or wells or water wells as defined in Title
32 MRSA, Section 4700-E, subsection 8 [7].
USE: The purpose for which land or a building is arranged, designed, or intended, or for which ,
either land or a building is or may be occupied or maintained.
VEGETATION: All live trees, shrubs, ground cover, and other plants.
WILDLIFE HABITAT, SIGNIFICANT WILDLIFE HABITAT: Areas identified by a
governmental agency such as the Maine Department of Inland Fisheries and Wildlife as having
|Page Site Plan Review 7/12/2021
|
significant value as habitat for animals and any areas identified in the municipality's
comprehensive plan. '
Sullivan Select Board
Rusty Gordon, Chair
Raymond Daley
Roget Wakefield
,
19|Page Site Plan Review | 7/12/2021
Z
Appendix A Site Plan Review Application
Application for
Site Plan Review
(Instructions for
Applicant)
Note to Applicant: Your application for Site Plan Review will not be
considered complete until all required information, plan(s), and
attachments have been submitted to the Planning Board. You are strongly
advised to read the furnished Site Plan Review Ordinance and meet with
the Planning Board and/or CEO prior to completing the application, to
share information about the proposed development and to become better
informed about all necessary information to be submitted for review.
Step 1: Prepare and Submit a Site Plan Review Application
e The application form provided by the Town must be completed with all
information that applies to the project as required by the standards in the
ordinance. This will allow the Planning Board to review the application
against the ordinance standards to determine if all pertinent information has
been included.
e The application must include a detailed and scaled map of the site, which may be
hand drawn or drafted by a professional. All measurements, dimensions and
locations of site elements (such as, buildings, well, septic, parking and sign), as .
outlined in the Ordinance, must be accurately reflected on this site plan.
e Some of the required information includes but is not limited to the following:
a copy of site deed; a copy of a certified survey map; and a copy of the portion
of Town tax map with map and lot#. names and address of all property owners
within 1000 feet of applicant's property.
e The completed application and attachments (7 copies) and accompanying fees, as
described in the Ordinance, must be submitted at the Town Office for the Planning >
Board Chairman. A receipt will be given to the applicant and a copy to the
Planning Board and CEO.
e For the Planning Board to become more fully informed about the proposed
development, it may arrange for an inspection of the site. Such site inspection
will be conducted by the Planning Board and CEO accompanied by the applicant.
e The site inspection may be conducted after the pre-application conference or
20|Page Site Plan Review 7/12/2021
|
after the initial review of the site plan application.
Step 2: Review of submitted Site Plan Review Application by CEO and Planning Board
e The Planning Board shail mail notification of the proposed development to all
property owners within 1000 feet of the parcel on which the development is
proposed, as well as Town Manager and Select Board.
® Within thirty (30) days of receipt of the completed application and fees, the
CEO and Board will review the submitted application and site plan to
determine if the application is complete.
e Ifthe application is determined to be incomplete, the Board will specify In
writing to the applicant any additional information required to make the
application complete.
e The Board will not consider the application until the additional information is
submitted to the Board.
Step 3: Final Review, Public Hearing. and decision by Planning Board
e As soon as the Board has determined the application to be complete, it will notify
the applicant in writing and send written notice of the date, time, and place of the
public hearing where the application is to be considered to the applicant and all!
persons who received notice in Step 2.
e The Board will take final action on the application within 30 days of the public
hearing.
e The Board will vote to deny, approve, or approve the application with conditions.
,
2|Page § Site Plan Review 7/12/2021
| |
Town of Sullivan
Site Plan Review Application
Submit fees along with seven (7) copies of application, site plan and all attachments.
Please label all attachments with applicant's name and question #,
1. Name of Property Owner
--._--s-2..---« Address of Owner
--_____. _~ :3..-~ Owner's telephone No. Home: > Cell: - -
____ ~-- 4,_-- Name of Applicant (if different than
owner)
--_----s 5... Address of Applicant
--__ ~-----6._--s Applicant's Telephone No. Home: - Cell: - -
__--s«S7«..:s If applicant is corporation, state whether the corporation is licensed to do business in the State of
Maine
Yes[ ] Nof[ ] If Yes, attach copy of the Secretary of State Registration
__.. 8. Name, address and phone number of applicant's authorized agent/representative (attach Letter of
Authorization)
Name: .
Address:
Phone:
_s----s«9,_-s If applicable, name, address and phone number of Professional Engineer, Licensed Land Surveyor or
Professional Planner who assisted in preparing site plan:
Name:
Address:
Phone:
Registration/License Number:
10. What interest does the applicant have in the project? (owner, agent, etc.)
_ 12. Attach a copy of deed to property, an option to purchase the property or other documentation to show
right, title or interest in the property on the part of the applicant.
_--s 13. Location of project: Book Page (from Registry of Deeds)
14. Location of project: Map Lot {from Town Office}
15. Using a reduction of the Town Tax Map, show locations of property with adjoining lots and roads.
_ 16. Attach a list of names and addresses of all property owners within 1000 feet of all property boundaries.
_ 17. Attach a certified survey map of the property that has been developed and produced by a registered land
surveyor which includes bearings and lengths of all property lines.
____--S--s:18. 'Is any portion of the property located within a mapped Shoreland Zone and/or a mapped Special Flood
Hazard Area? Yes[ ] No[ ] If Yes, indicate what zone: SZ SFHA ee ,
22|Page Site Plan Review 7/12/2021
i
EXISTING DEVELOPMENT
19. Attach a project site plan that includes the following elements:
a. North arrow, map scale, legend and/or labels, date. (scale may not be more than 100 feet to the inch
for that portion of the lot being proposed for development.)
--_--_ b. Setback lines for buildings and yards.
--_-- c. Indicate type of zone and location of zoning district boundaries. (shoreland zone or floodplain}
_ d. Location and size of existing culverts, drains, on-site waste disposal systems, underground tanks or
installations
_-- e. Location of existing wells, power lines, telephone lines and poles.
_ f. Location, dimensions and ground floor elevation of all existing buildings on the site.
_-- g. Location, names and widths of existing streets, easements, rights of ways, etc, within or adjacent to site
--_ h. Location and dimensions of existing driveways, parking and loading areas, walkways and sidewalks on
or immediately adjacent to site
ee i. Location of intersecting roads or driveways within 300 feet of the site.
a j.__ Locations, dimensions and lighting of existing signs.
PROPOSED DEVELOPMENT
20. Include on the same project site plan (or create a separate site plan) the following proposed elements:
a. If creating a separate site plan, include elements listed in 19 a through 19 j above that will remain the
same,
b. Location, dimensions and ground floor elevation of all proposed new buildings or building expansions,
c. Location and dimensions of any changes to, or newly proposed, driveways, sidewalks, parking and
loading areas (paved or unpaved).
d. Location and dimensions of changes to, or newly proposed, wastewater disposal system and water
supply.
e. Location of proposed landscaping and buffering.
f. Location, names and wicths of existing streets, easements, rights of ways, etc, within or adjacent to site
_-- g. Location, dimensions and lighting of any proposed signs.
NOTE: Site plan must have signature block titled "Approved: Town of Sullivan Planning Board" and have space for
signatures of Planning Board members and date.
21. Estimated demand for water supply and evidence of adequacy for proposed use (attach statement)
22. Estimated demand for sewage disposal and evidence of adequacy for proposed use (attach statement)
23. Ifnew or replacement on-site sewage disposal is proposed, attach HHE-200 form
--____.._ 24. If new or replacement interior plumbing is proposed, attach HHE-211 form
25. Explain how solid waste (trash, recyclables, etc.) be handled
26. If applicable, attach copies of any solid waste (trash) disposal/recycling contracts.
27. Estimate of current traffic flow and daily and peak traffic flow to be generated by the plan (attach statement)
28. Measures taken to preserve environmentally sensitive and natural drainage areas within the project area:
(attach statement) _
,
23|Page Site Plan Review 7/12/2021
|
29. If applicable, have other permits required by Town/State/Federal been applied for and received:
Applied For Received
Town: Type of Permit Yes[ ] No[ ] Yes[ ] No[ J
State: Type of Permit Yes[ ] No[ ] Yes{ J No[ ]
Federal: Type of Permit Yes[ ] No[ ] Yes[ ] No[ ]
30. Attach copies of any existing covenants or deed restrictions.
31. Estimated cost of project Start Date Completion Date
32. Planning Board may request evidence of applicant's technical and financial ability to carry out proposed project.
33. Other:
To the best of my knowledge, all information submitted on this application is true and correct:
Applicant's Signature Date
Notification to: Board of Selectman, Town Manager, Fire Chief, Plumbing Inspector Code Enforcement
Officer
,
24|Page «Site Plan Review | 7/12/2021