| AOUIN OF SWANVITT | . :
| | 6 Town House Road | .
EST. 1818 Swanville, Maine 04915 |
OTT |
, 207-338-5834 .
FAX 338-0189. |
2014,
Town of Swanville _
a, : ) . rm ---- o .
_ Preconstrution Permit
a and
W i a ® |
Land Use Ordinance ©
Aiests Adan Graabiansers 10/8) doled |
. Index
I Purpose
II Authority
III Scope
IV __ Basic Lot Requirements
Vv Definitions
VI Application Process
VII Construction Prohibited
' VOI Duration of Permit
IX Fees
Xx Enforcement
XI Penalties '
XII Severability
XIII Emergencies .
XIV _ Internal and Subsurface State Minimums
XV_ Effective Date
4. Any home improvement that will add more than $5,00.00 to the value
. of the property.
5. This Ordinance shall not apply to structures being moved through
Swanville, enroute to another municipality, provided that such
structures not be used while in Swanville.
IV. Basic Lot Size Requirements
A. Lot Requirements
I Shoreland zone: as required in the shoreland-zoning ordinance.
Swan Lake waterfront lot requirements may be revised by
Swanville Planning Board but must meet Shoreland Zoning
ordinance or State minimum requirements. Effective March 23,
2013.
2 Rural: 1 acre
i, The minimum size for any lot with a single residence is at least
20,000 square feet per Maine statute Chapter 12 Section 4807-
A. One acre is 43,560 square feet. Effective March 23, 2013.
B Wastewater Treatment:
The applicant must show that a proposed lot -- regardless of size
-- is provided with adequate subsurface wastewater treatment
ability. Such treatment can be provided on the lot or connected
to an approved shared use system. Effective March 23, 2013.
C. Lot Access: |
1 In order to ensure that remote lots may be serviced by roads or
utilities in the future, any new lot that is not located along a
public road or a private road built to standards must have a
minimum 50-foot right-of-way of deeded access to a public
road or a private road built to standards. This right-of-way may
be shared by multiple lots. It shall be suitable for installing
utilities and for constructing a driveway (if it is 250 or shorter)
2
a VI. Application Process:
1. Application forms may be obtained from the Town Clerk.
2. Completed applications, together with the $40.00 fee shall be filed
with the Town CEO, prior to construction.
3. The Town CEO will furnish two copies of the application to the
applicant, retain the original for his/her records, forward one copy
each to the Selectmen.
4. The applicant will post one copy in a conspicuous place at the
construction site, and retain the other copy.
VI. Construction Prohibited:
Construction shall not begin until the application has been found
complete by the Town CEO, this includes site preparation.
; Any construction done without a valid permit shall constitute a
violation of this Ordinance and a fine of double the permit fee.
_ Enforcement will be by the Code Enforcement Officer of the Town.
Any violations of the Town of Swanville ordinance that are not
covered by a penalty fall under Title 30A MRSA § 4452 penalties of
not less than $100. nor more than $2500. per day for each day of
violation. Effective March 23, 2013.
VIM. Duration of Permit:
The completed-and signed permit becomes valid for a period of One
Year from the date of issue.
Failure to substantially begin construction within One Year of the date
of issue shall render the permit invalid.
. IX. Fees: .
A
7 XII. Severability:
Shall any section or provision of this Ordinance be declared to be .
invalid by the courts, such decision shall not invalidate any other
section of provision of this Ordinance.
XII Emergencies:
The Selectmen may bill the landowner for emergency calls made to
the addresses of properties owned by the landowner.
| XIV Internal and Subsurface State Minimums:
As required by the state.
Effective Date: .
This Ordinance shall take effect on June 30, 1989, at twelve-midnight
local time, and shall not apply to any construction work essentially
begun before that time.
; 6
| | OWN OF SWANYIESS . |
| EST. 1818
Lenicwar aui.0Ww2
207-338-5834 |
| | FAX 338-0189 | |
- SWANVILLE
LOT
REQUIREMENTS
~ ORDINANCE
DA8 Siz
3/03) S
Town of Swanville
LOT REQUIREMENTS ORDINANCE
Adopted March 23, 2013
SECTION I.
A. Purpose
This ordinance defines lot requirements for Swanville's two (2) land districts: Shoreland zone,
and rural.
co, B. Applicability
These standards apply to all new lots created after date of this ordinance March 23, 2013.
C. Basic Lot Size Requirements | | |
1 Shoreland zone: as required in the Shoreland Zoning ordinance.
Swan Lake waterfront lot requirements may be revised by Swanville Planning Board but
must meet Shoreland Zoning ordinance or State minimum requirements.
2. Rural: 1 acre
The minimum size for any lot with a single residence is at least 43,560 square feet.
D. Wastewater Treatment
The applicant must show that a proposed lot -- regardless of size - is provided with adequate
subsurface wastewater treatment ability. Such treatment can be provided on the lot, or connected
to an approved shared use system.
E. Lot Access
In order to ensure that remote lots may be serviced by roads or utilities in the future, any new lot
that is not located along a public road or a private road built to standards must have a minimum
50-foot right-of-way of deeded access to a public road or a private road built to standards. This
right-of-way may be shared by multiple lots. It shall be suitable for installing utilities and for
constructing a driveway (if it is 250' or shorter) or a private road (if it serves two lots or more).
F. Road Frontage
1. All new lots must have at least 100' of road frontage along a public or private road.
2: If a lot does not have the 100' road frontage it is considered to be a back lot and must
meet the requirements in paragraph E.
G. Building setbacks from front property line.
1, Shoreland District: as Shoreland zoning ordinance requires.
z: Rural District: All permitted structures must be set back at least 50' from the edge of the
road or right of way whichever is further back.
H. Building setbacks from side and rear property lines.
Minimum 15' from side and rear property lines.
I. Parking
Adequate off-road parking shall be provided at the rate of two vehicle spaces per dwelling unit.
SECTION I.
fhe Enforcement
Enforcement will be by the Code Enforcement Officer of the Town. Any violations of the Town
/ of Swanville ordinance that are not covered by a penalty fall under Title 30A MRSA § 4452
penalties of not less than $100 nor more than $2,500 per day for each day of violation.
B. Emergency Calls
The Selectmen may bill the landowner for emergency calls made to the addresses of properties
owned by the landowner.
rs C. Effective Date
' This Ordinance shall become effective when enacted by the voters of the Town of Swanville at a
_ town meeting. ; ; ;
Dz. Severability
Shall any section or provision of this Ordinance be declared to be invalid by the courts, such
decision shall not invalidate any other section or provision of this Ordinance.
es Pun 4
CP iciAl Dew liens |
YA Abert 23/20/ 4
#4. Lot Requirements
Brian made a motion to accept. Discussion. Lot requirement have always
been one acre, not one half acre. Brian made a motion to amend Section one
-- C number 2, to one acre, with the minimum size of 43,560 square feet.
. Carol seconded passes. Carol made a motion to pass the ordinance as
amended, Brian seconded, and passes.
#5. Rental Occupancy .
Brian made a motion to accept, Carol seconded. Peter Petersen stated he felt
there were a lot of fines, fees and inspections. Bret is worried that the town
is getting into legal issues if someone is living in an unsafe place, if
something happens to them the town could be sued. David feels we could
protect our rental properties better if we have this ordinance. Owners of
rental properties felt that Section VII. Duration time of unoccupied rental of
) two months was not long enough, especially during winter months when
people normally do not move. A motion was made to change to six months,
seconded, and passes. Discussion on Section III. G. recreational rentals. A
Belmont resident, owner of a camp on Swan Lake, used as a rental during
summer months wanted to be sure she was exempt from the ordinance. She
is, but still must adhere to all codes, and does not have to have the CEO
_ inspect her property. Motion made to accept the ordinance, seconded, and
passes, 11 -- YES to 9- NO.
Minutes will be on the web site as soon as approved by. Selectmen.
Brian made a motion to adjourn at 10:55, Bret seconded, all in favor. .
| Respectably Submitted, aa £ ee
Helen Christianson Brian Thompson 7) ;
Town Clerk 4 pba hn fener
fganna Bonin f
. jo " Brett Armstrong Sr.
True and Attested Copy Melagthrstet tine
/