Town of Temple Shoreland Zoning Ordinance
Temple, Maine
· adopted 1991-11-07
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 3c7b5d8a5d8e · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
SHORELAND ZONING ORDINANCE
FOR THE |
TOWN OF TEMPLE
@
7 L. PULPOSES.....seesceseseeeeesseeseseeetssesstaseeseseeseseessesrercrcrsesessesessessaesnesusnseeataneneansnesarseeesesaneanesssersesnee A
2. AUthority .o..c.ccccccscsssssesscsesscsseseeseeeeseereesessseessessessnssnssseseesucssenererssecsssecsseeneensetsasesscantansereentens A
3. Applicability......c.ceececcescseceessssessecsessessesscesessesvesessoseessorsssessssersaessesasseeuensneaesseraesatsarsonsarsasenceassaes A
A, Effective Date....ccccccscccsssscssscssscssesscsessecscssssscsesesssesesesescacsesesessacaessacavsceterstecscesssecesssstetsnasensnssases 4
A. Effective Date of Ordinance and Ordinance Amendments. ...........ccsesscssererseeereeeene 4
. B. Repeal of Municipal Timber Harvesting Regulation..................:0eeeeeeeeeeeee eet
5. Availability... cecescscsssssectescseenensesscsscsesesessseeseseseseanssnseeanssssessersasensasereveseeesassneesnsenssannannnee seo
6. Severability .ccccseccsscscsessesesssesesesesscseseenensscnensavensnesseeecsesccsesesesssssnsssscsneseaaseaeasenenesenenenesneeticetes seed
7. Conflicts with Other Ordinances .......cccccscscesesccscceeeceeeeereseasnessercersessesecerseeserececeessesssetsseasseseeees)
8. Amendment ....ccccececcccccsccceccccscsssssesenscsesesseseseseseseussnensaesesseeecaceesscersersuseseessnsdassssassesaensensenseese sess)
9. Districts and Zoning Map..........cscecsccsssseseessececsesceeeeseeseseseseesencaesesnesaeseeeasereeceneoseeseseserersessene esa
A. Official Shoreland Zoning Map ........ccssessssessessvecssecescessceseesssseeseseeessssessnenecssenenseeness)
B. Scale Of Map .....cccsccssccsesssensereecscecerecseesesesssnsesseansesssasseensnrerscasesseessusseececesersacasenerstaeeaa)
C. Certification of Official Shoreland Zoning Map..........:-.c:cscsssssssessessessesessseseesereneseeered
D. Changes to the Official Shoreland Zoning Map .......s:cssessesseceeeeceesseseeseesresteeeneseensO
10. Interpretation of District Boundaries........c.ccccecssessseeserssnseseceessenessesesessnseneaeeensensenenreneeneasenteesO
11. Land Use Requirements ........cssssscsssessssseesessessessrssessesscssessussasascnsensesassscenssneensereceseessesenseneee 108
12. Non-conformance.......ccccccccsescsesessessscesensscessscsansccnenesaseesceessaceceessseacasesearsassassnsscaransenseeessseeses sree
A. PULPOSE...cssseesscesescccecesesestseeessseenseseessseasneseeneneseseesseesececsrsisecsesssestsnesesssessseessessersesssees O
B. Getneral....ccccccecccseeccccececescessssessecesesnsceaessestecassuseesesseareecessecacsesseeeessssnsseasassasstsasenenaseeeO
C. Non-Comformence evscscaccecsscscessvssessssssseasesassesacscessenesaecaeeececsecssessenersstssesessnsO
D. Non-conforming Use........cccecccccssccseseesesessessesessscsassasasnsesseserresseseesssessenessenenesneneeneaesaeD
E. Non-conforming Lots.....ccccsscsescseseeessceceeseccsesersssssessnneaesesssesnsesesnsensesesessesseessesesenseee LO
13. Establishment of Districts..........ccccccccccssceseseecereesessesceceeseeseeeeeeesestatsesateassaseseereseerereeersereerees LO
A. Resource Protection District ..........:ccccccsessessseeenssenseeeseeeececteesesesceseesserststssenssasserseareesee LQ
B. Limited Residential District .........c.ccccccccecssseseseseseseeceesenetseneesensesserensescscsesarereesesseeeesee LD
C. Stream Protection District .....cccccessecescsessseceersereeesestsestasssetsvenseerssserssesserssersseeetevesseaee LZ
14. Table of Land Uses.i....cccccccccessssssessesesesseseseeneseseesensesseesevseceeeceeeseessesesssnsesssansasstsnsesensssrersersees LD
15. Land Use Standards .......cccccccsscesssessesssessseeseeceseeseacaseesneaeececescescsessesacsesseentassasssanssceressarsesaseeees LA
A. Minimum Lot Standards ........cccccccssessersssscesesecrsecsceecesreeceeeeesserssseesestestassnsnssssesnsenne LA
B. Principal and Accessory Structures ..........csccsssseesssessessseeseseeseseseessseseensetsnserereiteneneaes 1D
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Beyond the Normal High-Water Line of a Water body or Within a Wetland .................17
D. Campgrounds .....c.cscsecsseerseccesecsesessssrsessssesseanesssuassssseescarsessesnsarsneesscesssssssatetseresensateeas 18
E. Individual Private Campsites ..........cccccceseeseeeseeceeneerecensatsessnssstssssessassseseeecseseeeessseree 18
F. Commercial and Industrial Uses ..........:cccccsccscecesereeeceseeteseeerereseeetsstesntestsersseerseeeee 18
G. Parking Areas.......ccccccssesessseserssstensecssecessceceesseesesssssesnesesnesansnseessesrerssazssssesesesseesereteees EQ
H. Roads and Driveways ......:..::scceccsssssesssteeccstenererenencacseeeececessevsseecscrsesssessssstsearenecseesarseese LD
J. Storm Water Rumof c.ccccccsscscsscscsesssssssssscsseesececenevscserssseseeseaenactarseatentesserssnesssnssnerees 2 L
K. Septic Waste Disposal ..........c.ceccceseesee eee eec eee ec eee sseeseeeeeseessessstestssecenens DI
L. Essential Services .......ccccceccsscssscssssessceececeessesacssssaaeeacetentoeeanensesesnesenssassersaceaeerreonsnesee DD
M. Mineral Exploration and Extraction 0.0.00. esesseesessssnsessssesersesersseresseeersreaseers 2
N. Agriculture .....cccecesssseeseeseseececrseeseceseerscscsesscesssecsescsssssseseenssansssasasnsasesscauaeatsseseareessers 23
O. Timber Harvesting .0........ccccccecccscsssssesceeteetenteaeensenessassarsessssessecaecersserereeseseetsesesssessessee DD
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ..... 25
Q. Hazard Trees , Storm damaged trees, And Deed Tree Removall...........ssssssseeered 7
R.Exemptions to Clearing and Vegetation Requirementts............sssesssssseserseseesessenree 29
S.Revegation Requirement...........cscssssecssssssssnsensecssssssesscnasesereassesssassecessecesnesessecsereses OU
T. Erosion and Sedimentation Control ........ssccssssesconsserersssssesescssscssascesscsensescassensess © OD
2
UW. Sods oeececccssscsssscescccceeessesesscsccsescencssaceseaceessseaeaenacasseversensssgeegssteraceecssesesssessessssstasesse eee DD
. V. Water Quallity....cccceccccessssssesssesssseeesteueesseetensnsarsesrensacavscsrecsssecsesnssssneassesssessessarssensetans BO
W Archaeological Site cc cesesseseseesesesseeseersssnseseesesnseesesnesstsasssasssenesseasnentesieeseess eee OD
16. Administration.....cccccccsccsccssesecssccescsesssesescssseseecsescscsesessanecueneetseseeesserereravsrscsesescsentessnsnssetsessases OF
A. Administering Bodies and Agents ..........scscecssseeseseeseeneeessseeesnessassnasssessesessenenssees OF
B. Permits Required...c..cccccccccsecececcsessseseesesesescsceessnseseaetansesneesevsrsseeesenessesesarsssensssserssates DO
C. Permit Application ......ccccesesesseneseseseseccsccesesseecscsssesesnenssesseessassensevssersnenseressegeeeterees 3D
D. Procedure for Administering Permits ............:cccscesesesscesesesesesesesesssesrsneesestsneeaeetees oe DO
E. Expiration of Permit.........cccecseesesseesscsececsssesseresessesessssesnessansnessenssnarsatsseteanereetertarteees 3D
F. Installation of Public Utility Service oo... cesses cesseretenersiseeesesetestseeseeseneneeenere OD
G. Appeals o...e.esceeeceseesessesssseteseseseececsecsesesesesssssecsesssnssssssessesausaeseneseeensseaseraneasitesereeacisasee Do
H. Enforcement......c.ccccccceccscsssssessssesescensssessscsessscsecseaeaescesseeseereresseescsseeseresessnermsatsssaneesedO
17. Definitions 0.0... eccececesssecsecscscscaeseeeseasacsesensecaeseneesecessescsssescsensersersasisinseatssssersenranststssaesesenrees OD
Appendix A
Timber Harvesting -- Statewide Standards
[Effective on effective date established in Section 4(B)].............::cccsseceeneeseeeeeeereneee AY
3
Shoreland Zoning Ordinance for the Municipality of Temple
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life,
bird and other wildlife habitat; to protect buildings and lands from flooding and accelerated
erosion; to protect archaeological and historic resources; to protect freshwater wetlands; to
control building sites, placement of structures and land uses; to conserve shore cover, and visual
as well as actual points of access to inland waters; to conserve natural beauty and open space; and
to anticipate and respond to the impacts of development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38
sections 435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 250 feet, horizontal distance, of
the .
¢ normal high-water line of any great pond, or
¢ upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending or located below the normal high-water line of a water body or within a
wetland.
4, Effective Date
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
adopted by the municipal legislative body on November 7, 1991, and amended on ;
2010, shall not be effective unless approved by the Commissioner of the Department of
Environmental Protection. A certified copy of the Ordinance, or Ordinance Amendment, attested
and signed by the Municipal Clerk, shall be forwarded to the Commissioner for approval. If the
Commissioner fails to act on this Ordinance or Ordinance Amendment, within forty-five (45)
days of his/her receipt of the Ordinance, or Ordinance Amendment, it shall be automatically
approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
B. Repeal of Municipal Timber Harvesting Regulation. The municipal regulation of timber
harvesting activities is repealed on the statutory date established under 38 M.R.S.A. section 438-
B(5), at which time the State of Maine Department of Conservation's Bureau of Forestry shall
administer timber harvesting standards in the shoreland zone. On the date established under 38
M.R.S.A section 438-B(5), the following provisions of this Ordinance are repealed:
* Section 14. Table of Land Uses, Item 3 (Forest management activities except for
timber harvesting) and Item 4 (Timber harvesting);
¢ Section 15(O) in its entirety; and
4
* Section 17. Definitions, the definitions of "forest management activities", "residual
basal area", "skid trail", and "slash".
NOTE: The statutory date established under 38 M.R.S.A. section 438-B(5) is the effective date of
state-wide timber harvesting standards. That date is "the first day of January of the 2na year
following the year in which the Commissioner of Conservation determines that at least 252 of the
336 municipalities identified by the Commissioner of Conservation as the municipalities with the
highest acreage of timber harvesting activity on an annual basis for the period 1992-2003 have
either accepted the state-wide standards or have adopted an ordinance identical to the state-wide
standards." 38 M.R.S.A. section 438-B(5) further provides that "the Commissioner of
Conservation shall notify the Secretary of State in writing and advise the Secretary of the
effective date of the state-wide standards." The state-wide standards that will be administered by
the Department of Conservation are found in Appendix A, which shall not be part of this
Ordinance.
5, Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and --
shall be accessible to any member of the public. Copies shall be made available to the public at
reasonable cost at the expense of the person making the request. Notice of availability of this |
Ordinance shall be posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or
statute administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body.
Copies of amendments, attested and signed by the Municipal Clerk, shall be submitted to the
Commissioner of the Department of Environmental Protection following adoption by the
municipal legislative body and shall not be effective unless approved by the Commissioner. If the
Commissioner fails to act on any amendment within forty-five (45) days of his/her receipt of the
amendment, the amendment is automatically approved. Any application for a permit submitted to
the municipality within the forty-five (45) day period shall be governed by the terms of the
amendment, if such amendment is approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are
hereby divided into the following districts as shown on the Official Shoreland Zoning
Map(s) which is (are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less
than: linch = 2000 feet. District boundaries shall be clearly delineated and a legend
indicating the symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map
shall be certified by the attested signature of the Municipal Clerk and shall be located in
5
the municipal office. In the event the municipality does not have a municipal office, the
Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with
Section 8, are made in the district boundaries or other matter portrayed on the Official
Shoreland Zoning Map, such changes shall be made on the Official Shoreland Zoning
Map within thirty (30) days after the amendment has been approved by the
Commissioner of the Department of Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland
Zoning Map, district boundary fines are property lines, the centerlines of streets, roads and rights
of way, and the boundaries of the shoreland area as defined herein. Where uncertainty exists as to
the exact location of district boundary lines, the Board of Appeals shall be the final authority as to
location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shali hereafter be
erected, constructed, expanded, moved, or altered and no new lot shall be created except in
conformity with all of the regulations herein specified for the district in which it is located, unless
a variance is granted.
12. Non-conformance. .
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that
non-conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set forth in
Section 12. Except as otherwise provided in this Ordinance, a non-conforming condition
shall not be permitted to become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be
transferred, and the new owner may continue the non-conforming use or continue to
use the non-conforming structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures including repairs or
renovations that do not involve expansion of the non-conforming use or structure,
and such other changes in a non-conforming use or structure as federal, state, or local
building and safety codes may require.
NOTE: See Section 17 for the definitions of non-conforming structures, non-conforming uses
and non-conforming lots.
C. Non-conforming Structures
(1) Expansions. All new principal and accessory structures, excluding
functionally water dependent uses, must meet the water body,
tributarystream, or wetland setback requirements contained in Section15(B)
(1). A non-conforming structure may be added to or expanded after obtaining a
6
permit from the same permitting authority as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure and is
in accordance with subparagraph(a) and (b) below.
(a) Expansion of any portion of a structure within 25 feet of the normal high-
water line of a body of water, tributary stream, or upland edge of a wetland
is prohibited, even if the expansion will not increase the non-conformity with
the water body, tributary stream or wetland setback requirement. Expansion
of an accessory structure that is located closer to the normal high-water line
of a water body, tributary stream or upland edge of a wetland than the
principal structure is prohibited, even if the expansion will not increase the
non-conformity with the water body, tributary stream or wetland setback
requirement.
(b) Notwithstanding paragraph(a), above, if a legally existing non-conforming
principal structure is entirely located less than 25 feet from the normal high-
water line of a water body, tributary stream or upland edge of a wetland,
that structure may be expanded as follows, as long as all other applicable
municipal land use standards are met and the expansion is not prohibited by
Section 12(C)(1).
(i) The maximum total footprint for the principal structure may not be
expanded to a size greater than 800 square feet or 30% larger than the footprint
that existed on January 1, 1989, whichever is greater. The maximum height of the
principal structure may not be made greater than 15 feet or the height of the
existing structure, whichever is greater.
(c) All other legally existing nonconforming principal and accessory structures
that do not meet the water body, tributary stream or wetland setback
requirements may be expanded or altered as follows, as long as other
applicable municipal land use standards are met and the expansion is not
prohibited by Section 12(C)(1), above.
(i)For structures located less than 75 feet from the normal high-water
line of a water body, tributary stream or upland edge of a wetland, the
maximum combined total footprint for all structures may not expanded
to a size greater than 1,000 square feet or 30% larger than the footprint
that existed on January 1, 1989, whichever is greater. The maximum
height of the principal structure may not be made greater than 20 feet or
the height of the existing structure, whichever is greater.
(ii) For structures located less than 100 feet from the normal high-water line
of a great pond classified as GPA or a river flowing to a great pond classified as a
GPA, the maximum combined total footprint for all structures may not expanded to
a size greater than 1,500 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the principal
7
structure may not be made greater than 25 feet or the height of the existing
structure, whichever is greater. Any portion of those structures located less than 75
feet from the normal high-water line of a water body, tributary stream or upland
edge of a wetland must meet the footprint and height limits in Section 12(C)(1)(b)()
and Section 12(C)(1)(e)(i), above.
(iii) In addition to the limitations in subparagraph (i) and (ii), for structures
that are due to their legally non-conforming due to their location within the
Resource Protection District when located at less than 250 feet from the normal
high-water line of a water body or upland edge of a wetland, the maximum
combined total footprint for all structures may not expanded to a size greater than
1,500 square feet or 30% larger than the footprint that existed at the time the
Resource Protection District was established on the lot, whichever is greater. The
maximum height of any structure may not be made greater than 25 feet or the
height of the existing structure, whichever is greater, except that any portion of
those structures located less than 75 feet from the normal high-water line of a water
body, tributary stream or upland edge of a wetland must meet the footprint and
height limits in Section 12(C)(1)(b)G) and Section 12(C)(1)(e)(i), above.
; (d)An approved plan for expansion of a non-conforming structure must be
recorded by the applicant with the registry of deeds, within 90 days of approval.
The recorded plan must show the existing and proposed footprint of the non-
conforming structure, the existing and proposed structure height, the footprint of
any other structures on the parcel, the shoreland zone boundary and evidence of
approval by the municipal review authority.
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed
under a non-conforming structure, the structure and new foundation must be placed such
that the setback requirements is met to the greatest practical extent as determined by the
Planning Board or its designee, basing its decision on the criteria specified in Section
12(C)(3)
(4) Reconstruction or Replacement. Any non-conforming structure which is located
less than a water body, tributary stream, or wetland and which is removed, or damaged
or destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or replaced
provided a permit is obtained within 18 months of the date of said damage, destruction or
removal, and provided that such reconstruction or replacement is in compliance with the
water body, tributary stream or wetland setback requirements to the greatest practical
extent as determined by the Planning Board or its designee in accordance with the
purposes of this Ordinance. In no case shall a structure be reconstructed or replaced so as
to increase the non-conformity. If the reconstructed or replaced structure is less than the
required setback, it shall not be any larger than the original structure, except as allowed
pursuant to Section 12(C)(1) above, as determined by the non-conforming footprint of
8
the reconstructed or replaced structure at its new location. If the total footprint of the
original structure can be relocated or reconstructed beyond the required setback area, no
portion of the relocated or reconstructed structure shall be replaced or constructed at less
than the setback requirement for a new structure. When it is necessary to remove
vegetation in order to replace or reconstruct a structure, vegetation shall be replanted in
accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water body,
tributary stream, or wetland and which is removed by 50% or less of the market value, or
damaged or destroyed by 50% or less of the market value of the structure, excluding normal
maintenance and repair, may be reconstructed in place if a permit is obtained from the Code
Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(2) above, the physical condition and type of foundation present, if any.
(5) Change of Use of a Non-conforming Structure.
The use of a non-conforming structure may not be changed to another use unless the Planning
Board, after receiving a written application, determines that the new use will have no greater
adverse impact on the water body, tributary stream, or wetland, or on the subject or adjacent
properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health and
safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative cover, visual
and actual points of public access to waters, natural beauty, floodplain management,
archaeological and historic resources, and functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-
conforming residential uses may, after obtaining a permit from the Planning Board, be
expanded within existing residential structures or within expansions of such structures as
allowed in Section 12(C)(1) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use
is discontinued for a period exceeding one year, or which is superseded by a conforming
use, may not again be devoted to a non-conforming use except that the Planning Board
may, for good cause shown by the applicant, grant up to a one year extension to that time
period. This provision shall not apply to the resumption of a use of a residential structure
provided that the structure has been used or maintained for residential purposes during
the preceding five (5) year period,
(3) Change of Use. An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on the
subject and adjacent properties and resources than the former use, as determined by the
Planning Board. The determination of no greater adverse impact shall be made according
to criteria listed in Section 12(C)(4) above.
9
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in
the same ownership, and that all provisions of this Ordinance except lot area, lot width
and shore frontage can be met. Variances relating to setback or other requirements not
involving lot area, lot width or shore frontage shall be obtained by action of the Board of
Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do
not meet the dimensional requirements of this Ordinance, and if a principal use or
structure exists on each lot, the non-conforming lots may be conveyed separately or
together, provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A
through 4807-D) and the State of Maine Subsurface Wastewater Disposal Rules are
complied with.
If two or more principal uses or structures existed on a single lot of record on the
effective date of this ordinance, each may be sold on a separate lot provided that the
above referenced law and rules are complied with. When such lots are divided each lot
thus created must be as conforming as possible to the dimensional requirements of this
. Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are
in single or joint ownership of record at the time of or since adoption or amendment of
this Ordinance, if any of these lots do not individually meet the dimensional requirements
of this Ordinance or subsequent amendments, and if one or more of the lots are vacant or
contain no principal structure the lots shall be combined to the extent necessary to meet
the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is
nonconforming, owned by the same person or persons on the effective date 1991 of this
Ordinance and recorded in the registry of deeds if the lot is served by a public sewer or can
accommodate a subsurface sewage disposal system in conformance with the State of Maine
Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological
ecosystems, or scenic and natural values. This district shall include the following areas
10
when they occur within the limits of the shoreland zone, exclusive of the Stream
Protection District, except that areas which are currently developed need not be included
within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands,
and wetlands associated with great ponds, which are rated "moderate" or "high" value
waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a
Geographic Information System (GIS) data layer maintained by either MDIF&W or
the Department as of December 31, 2008. For the purposes of this paragraph
"wetlands associated with great ponds" shall mean areas characterized by non-
forested wetland vegetation and hydric soils that are contiguous with a great pond,
and have a surface elevation at or below the water level of the great pond during the
period of normal high water. "Wetlands associated with great ponds" are considered
to be part of that great pond.
In Temple there are six wetlands that are rated "moderate" or "high" value for
waterfowl and wading bird habitat. Three of these wetland areas are associated with
great ponds. On the Shoreland Zoning Map, they are, respectively, number 103,
located on the northeastern shore of Drury Pond; number 104, located on the
southeastern and southern shores of Drury Pond; and number 108 at the
northwestern corner of Staples Pond. The remaining three wetlands rated "moderate
or "high" value are numbered 92, 102, and 106 on the Shoreland Zoning Map. In
wetlands 90 and 107, the portions of the shoreland zone designated as Resource
Protection are so designated because they contain forested wetlands. Large-scale
maps available in the Temple Town Office show the outlines of each Resource
Protection area in some detail.
NOTE: The Natural Resources Protection Act, 38 M.S.R.A. sections 480-A through 480-Z,
requires the Department of Environmental Protection to designate areas of "significant
wildlife habitat". Significant wildlife habitat includes:
Habitat for species appearing on the official state or federal lists of endangered or
threatened species; high and moderate value deer wintering areas and travel corridors as
defined by the Department of Inland Fisheries and Wildlife; high and moderate value
waterfowl and wading bird habitats, including nesting and feeding areas as defined by the
Department of Inland Fisheries and Wildlife; critical spawning and nursery areas for
Atlantic sea run salmon as defined by the Atlantic Sea Run Salmon Commission; and
shorebird nesting, feeding and staging areas and seabird nesting islands as defined by the
Department of Inland Fisheries and Wildlife.
(2) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
Shoreland properties lying along about 1800 feet of the northwest shore of Drury
Pond, measured from an iron stake at the southwest end to the edge of a brook
at the northwest end are included in this category with the exception of developed
lots 53, 37 and 58 on Temple Tax Map R-6. These three lots are zoned Limited
Residential.
(3) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric
soils, which are not part of a freshwater wetland as defined, and which are not
surficially connected to a water body during the period of normal high water.
11
NOTE: These areas usually consist of forested wetlands abutting water bodies and non-forested
wetlands.
B. Limited Residential District. The Limited Residential District includes those areas suitable
for residential and recreational development. it includes areas other than those in the
Resource Protection District, or Stream Protection District.
C. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream,
exclusive of those areas within two-hundred and fifty (250) feet, horizontal distance, of the
normal high-water line of a great pond, or within two hundred and fifty (250) feet, horizontal
distance, of the upland edge of a freshwater wetland. Where a stream and its associated
shoreland area are located within two-hundred and fifty (250) feet, horizontal distance, of the
above water bodies or wetlands, that land area shall be regulated under the terms of the
shoreland district associated with that water body or wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the
Shoreland Zone, shall conform with all of the applicable land use standards in Section 15. The
district designation for a particular site shall be determined from the Official Shoreland Zoning
Map.
Key to Table |:
Yes - Allowed (no permit required but the use must comply with all applicable land use
standards.)
No - Prohibited
PB - Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP - Resource Protection
LR - Limited Residential
SP - Stream Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
. LAND USES DISTRICT
12
sp RP LR
1. Non-intensive recreational uses not requiring
structures such as hunting, fishing and hiking yes yes yes
. 2. Motorized vehicular traffic on existing roads and trails yes yes yes
3. Forest management activities except for timber
harvesting yes yes yes
4. Timber harvesting yes CEO _ yes
5. Clearing or removal of vegetation for activities other
than timber harvesting CEO CEO! »yes
6. Fire prevention activities yes yes yes
7. Wildlife management practices yes yes yes
8. Soil and water conservation practices yes yes yes
9, Mineral exploration no yes? yes"
10. Mineral extraction including sand and gravel extraction no PB' PB
11. Surveying and resource analysis yes yes yes
12. Emergency operations yes yes yes
13. Agriculture yes PB yes
14. Aquaculture PB PB PB
15. Principal structures and uses
A. One and two family residential, including driveways PB' no CEO
B. Multi-unit residential no no PB
C. Commercial no no'? no'°
D. Industrial no no no
E. Governmental! and institutional no no PB
F.Small non-residential facilities for educational,
scientific, or nature interpretation purposes PB* PB CEO
16. Structures accessory to allowed uses PB* PB CEO
17. Piers, docks, wharfs, bridges and other structures and
uses extending over or below the normal high-water
line or within a wetland
a. Temporary CEO" CEO! CEO"
b. Permanent PB PB PB
18. Conversions of seasonal residences to year-round
residences LPI LPI LPI
19. Home occupations PB PB PB
20. Private sewage disposal systems for allowed uses LPI LPI LPI
21. Essential services
A. Roadside distribution lines (34.5kV and lower) CEO' CEO® yes"
B. Non-roadside or cross-country distribution lines
involving ten poles or less in the shoreland zone PB' PB' CEO
C. Non-roadside or cross-country distribution lines
involving eleven or more poles in the shoreland zone PB* PB® PB
D. Other essential services PBS PB* PB
22. Service drops, as defined, to allowed uses yes yes yes
23. Public and private recreational areas involving
minimal structural development PB PB PB
24. Individual, private campsites CEO CEO CEO
25. Campgrounds no no' PB
26. Road construction PB no* PB
27. Parking facilities no no' PB
28. Marinas PB no PB
29. Filling and earth moving of <10 cubic yards CEQ CEO yes
Land Uses District
13
30. Filling and earth moving of >10 cubic yards PB PB CEO
31. Signs yes yes yes
32. Uses similar to allowed uses CEO CEO CEO
34. Uses similar to uses requiring a CEO permit CEO CEO CEO
35. Uses similar to uses requiring a PB permit PB PB PB
'In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except
to remove safety hazards.
Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total,
is disturbed.
31n RP not allowed in areas so designated because of wildlife value.
'Provided that a variance from the setback requirement is obtained from the Board of Appeals.
°See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is
required from the PB.
®Except as provided in Section 15(H)(3).
"Reserved
Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are
allowed in the respective district.
liexcluding bridges and other crossings not involving earthwork, in which case no permit is required.
permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the Department of
Environmental Protection, pursuant to 38 M.R.S.A. section 480-C, if the activity occurs in, on, over or
adjacent to any freshwater wetland, great pond, river, stream or brook and operates in such a manner that
material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B, Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall. conform with the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot | Minimum
Area (sq. ft.) ~ Shore
Frontage (ft.)
Q)
(a) Residential per dwelling unit 40,000 200
(b) Governmenal, Institutional, or
Commercial per principal structure 60,000 300
(c) Public and Private Recreational Facilities -40,000 200
(2) Land below the normal high-water.line of a-water body or upland edge of a wetland and land
beneath roads serving more than two (2).lots shall not be included toward. calculating
minimum lot area.
14
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial
or industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
Structure, or use.
B. Principal and. Accessory. Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100)
feet, horizontal distance, from the normal high-water line of great ponds, and seventy-five
(75) feet, horizontal distance, from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland. In the Resource Protection District the setback
requirement shall be 250 feet, horizontal distance, except for structures, roads, parking spaces
or other regulated objects specifically allowed in that district in which case the setback
requirements specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-dependent
uses.
(b) On a non-conforming lot of record on which only a residential structure exists, and it is
not possible to place an accessory structure meeting the required water body, tributary stream
or wetland setbacks, the code enforcement officer may issue a permit to place a single
accessory structure, with no utilities, for the storage-of yard tools and similar equipment.
Such accessory structure shall not exceed. eighty (80) square feet in area nor eight (8) feet
in-height, and shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall-the structure be located closer to the shoreline or tributary
stream than the principal structure.
NOTE: A tributary stream may be perennial or intermittent. Where a tributary stream is present
within the shoreland zone, setback standards from that tributary stream are applicable.
(2) Principal or accessory structures and expansions of existing structures which are
permitted in the Resource Protection, Limited Residential, and Stream Protection Districts,
shall not exceed thirty-five (35).feet in-height. This provision shall not apply to structures _
such as transmission towers, windmills, antennas, and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least one foot above the elevation of the 100 year flood, the
15
flood of record, or in the absence of these, the flood as defined by soil types identified as
recent flood-plain soils. In those municipalities that participate in the National Flood
Insurance Program and have adopted the April 2005 version, or later version, of the
Floodplain Management Ordinance, accessory structures may be placed in accordance with
the standards of that ordinance and need not meet the elevation requirements of this
paragraph.
(4) The total footprint area of all structures, parking lots and other non-vegetated surfaces,
within the shoreland zone shall not exceed twenty (20) percent of the lot or a portion thereof,
located within the shoreland zone, including land area previously developed.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a
site eroding from lack of naturally occurring vegetation, and which cannot be stabilized
with vegetative plantings; ;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on streams and
tributary streams, as designated on the Federal Emergency Management Agency's
(FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of
record, or in the absence of these, by soil types identified as recent flood plain soils.
(f) The area behind the wail is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a wetland
when a natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i) The buffer must include shrubs and other woody and herbaceous vegetation.
Where natural ground cover is lacking the area must be supplemented with leaf or
bark mulch;
(11) Vegetation plantings must be in quantities sufficient to retard erosion and
provide for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
16
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the
buffer;
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal distance, of a
water body or tributary stream, a permit pursuant to the Natural Resource Protection Act
is required from the Department of Environmental! Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in
areas of steep slopes or unstable soils provided: that the structure is limited to a maximum of
four (4) feet in width; that the structure does not extend below or over the normal high-water
line of a water body or upland edge of a wetland, (unless permitted by the Department of
Environmental Protection pursuant to the Natural Resources Protection Act, 38 M.R.S.A.
section 480-C); and that the applicant demonstrates that no reasonable access alternative
exists on the property.
C, Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within a Wetland.
(1)No more than one pier, dock, wharf or similar structure extending or located below the
normal high-water line of a water body or within a wetland is allowed on a single lot;
except that when a single lot contains at least twice the minimum shore frontage as
specified in Section 15{A), a second structure may be allowed and may remain as long as t
he lot is not further divided.
(2) Access from shore shall be developed on soils appropriate for such use and constructed so
as to control erosion,
(3) The location shail not interfere with existing developed or natural beach areas.
(4) The facility shail be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or
wharf shall not be wider than six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
(7) New permanent piers and docks shall not be permitted unless it is clearly demonstrated to
the Planning Board that a temporary pier or dock is not feasible, and a permit has been
obtained from the Department of Environmental Protection, pursuant to the Natural
Resources Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any district.
17
(9) Structures built on, over or abutting a pier, wharf, dock or other structure extending
beyond the normal high-water line of a water body or within a wetland shal! not exceed
twenty (20) feet in height above the pier, wharf, dock or other structure.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under
State licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds
are allowed provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
(2)When an individual private campsite is proposed on a lot that contains another principal
use and/or structure, the lot must contain the minimum lot dimensional requirements for the
principal structure and/or use, and the individual private campsite separately.
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or
tent platform, shall be set back one hundred (100) feet, horizontal distance, from the normal
high-water line of a great pond, and seventy-five (75) feet, horizontal distance, from the
normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle
shall not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shal! be attached to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter
in a Resource Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shail be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or land
owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
18
facilities.
F. Commercial and Industrial Uses. New commercial and industrial uses are
prohibited, except for permitted home occupations as defined, and other commercial uses as
allowed per Table 1. Land Uses in the Shoreland Zone.
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities shall be no less than fifty (50) feet,
horizontal distance, from the shoreline or tributary stream if the Planning Board finds that no
other reasonable alternative exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent stormwater runoff from flowing directly into a water body, tributary stream or
wetland and where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall
apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet jong.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shail apply to the construction of roads
and/or driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond, and seventy-five (75) feet,
horizontal distance from the normal high-water line of other water bodies, tributary streams,
or the upland edge of a wetland unless no reasonable alternative exists as determined by the
Planning Board. If no other reasonable alternative exists, the road and/or driveway setback
requirement shall be no fess than fifty (50) feet, horizontal distance, upon clear showing by
the applicant that appropriate techniques will be used to prevent sedimentation of the water
body, tributary stream, or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and/or the effective use of additional ditch relief culverts and
turnouts placed so as to avoid sedimentation of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 15 (H\(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline or
tributary stream due to an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures within the setback area
19
shall comply fully with the requirements of Section 15(H)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardiess of
their setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route or
location is available outside the district. When a road or driveway is permitted in a Resource
Protection District the road and/or driveway shall be set back as far as practicable from the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
(4) Road and driveway banks shail be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section !15(Q).
(5) Road and driveway grades shall! be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water
bodies, tributary streams or wetlands, roads and driveways shall be designed, constructed,
and maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
highwater line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed
'na manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced
along the road, or driveway at intervals no greater than indicated in the following table:
Grade Spacing
(Percent) (Feet)
0-2 250
3-5 200-135
6-10 100-80
11-15 80-60
16-20 60-45
21+ 40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
20
placed at approximately a thirty (30) degree angle downslope from a line perpendicular to
the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow
for effective functioning, and their inlet and outlet ends shall be stabilized with
appropriate materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shali be maintained on a regular basis to
assure effective functioning.
I Signs. The following provisions shall govern the use of signs in the Resource Protection,
Stream Protection, and Limited Residential Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. Signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating
to the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to
number provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shail be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shal! be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to
. be obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most-at-risk lake watershed, or a project with | acre or
more of developed area in any other stream, coastal or wetland watershed. A permit-byrule
is necessary for a project with one acre or more of disturbed area but less than | acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams)
21
and less than 5 acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State
of Maine Subsurface Wastewater Disposal Rules, and the following: a) clearing or removal
of woody vegetation necessary to site a new system and any associated fill extensions, shall
not extend closer than seventy-five (75) feet, horizontal distance, from the normal high-water
line of a water body or the upland edge of a wetland and b) a holding tank is not allowed for a
first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the normal
high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public
ways and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed
in a Resource Protection or Stream Protection District, except to provide services to a
permitted use within said district, or except where the applicant demonstrates that no
reasonable alternative exists. Where allowed, such structures and facilities shall be located so
as to minimize any adverse impacts on surrounding uses and resources, including visual
impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent
of mineral resources shall be accomplished by hand sampling, test boring, or other methods
which create minimal disturbance of less than one hundred (100) square feet of ground surface. A
permit from the Code Enforcement Officer shall be required for mineral exploration which
exceeds the above limitation. All excavations, including test pits and holes, shall be immediately
capped, filled or secured by other equally effective measures to restore disturbed areas and to
protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a
permit is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(3) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall
be permitted within one hundred (100) feet, horizontal distance, of the normal high-water line
of a great pond, and seventy-five (75) feet, horizontal distance, of the normal high-water line
of any other water body, tributary stream, or the upland edge of a wetland. Extraction
22
operations shall not be permitted within fifty (50) feet, horizontal distance, of any property
line without written permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
(a) Ail debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid waste
management rules, Chapters 400-419 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such materials.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(5) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shal] be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on November 1,
2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal
distance, of a great pond, or within seventy-five (75) feet horizontal distance, of other water
bodies, tributary streams, or wetlands. All manure storage areas within the shoreland zone
must be constructed or modified such that the facility produces no discharge of effluent or
contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond; within seventy-five (75) feet, horizontal distance,
from other water bodies; nor within twenty-five (25) feet, horizontal distance, of tributary
streams and freshwater wetlands. Operations in existence on the effective date of this
ordinance and not in conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
23
feet, horizontal distance, of the normal high-water line of a great pond; within seventy-five
(75) feet, horizontal distance, of other water bodies; nor within twenty-five (25) feet,
horizontal distance, of tributary streams and freshwater wetlands. Livestock grazing
associated with ongoing farm activities, and which are not in conformance with the above
setback provisions may continue, provided that such grazing is conducted in accordance with
a Conservation Plan.
O. Timber Harvesting
(1) In a Resource Protection District abutting a great pond, timber harvesting shall be limited to
the following:
(a) Within the strip of land extending 75 feet, horizontal distance, inland from the normal
high-water line there shall be no timber harvesting, except to remove safety hazards.
(b) Beyond the 75 foot strip referred to in Section 15(O)(1)(a) above, timber harvesting is
permitted in accordance with paragraph 2 below except that in no case shall the average
residual basal area of trees over | inch in diameter at 4 1/2 feet above ground level
be reduced to less than 30 square feet per acre.
(2) Except in areas as described in Section 15(O){1) above, timber harvesting shall conform
with the following provisions:
(a) Selective cutting of no more than forty (40) percent of the total volume of trees four
(4) inches or more in diameter measured at 4 1/2 feet above ground Jevel on any lot in
any ten (10) year period is permitted. In addition:
(i) Within one-hundred (100) feet, horizontal distance, of the normal high-water line
of a great pond, and within seventy-five (75) feet, horizontal distance, of the normal
high-water line of other water bodies, tributary streams, or the upland edge of a
wetland, there shall be no clearcut openings and a well-distributed stand of trees and
other vegetation, including existing ground cover, shall be maintained.
(ii) At distances greater than one-hundred (100) feet, horizontal distance, of a great
; pond, and greater than seventy-five (75) feet, horizontal distance, of the normal high-
water line of other water bodies or the upland edge of a wetland, harvesting
operations shall not create single clearcut openings greater than ten-thousand
(10,000) square feet in the forest canopy. Where such openings exceed five-thousand
(5000) square feet they shall be at least one hundred (100) feet, horizontal distance,
apart. Such clearcut openings shall be included in the calculation of total volume
removal. Volume may be considered to be equivalent to basal area.
(b) Timber harvesting operations exceeding the 40% limitation in Section 15(O)(2)(a)
above, may be allowed by the planning board upon a clear showing, including a forest
management plan signed by a Maine licensed professional forester, that such an
exception is necessary for good forest management and will be carried out in accordance
with the purposes of this Ordinance. The planning board shall notify the Commissioner
of the Department of Environmental Protection of each exception allowed, within
fourteen (14) days of the planning board's decision.
(c) No accumulation of slash shall be left within fifty (50) feet, horizontal distance, of the
24
normal high-water line of a water body. In all other areas slash shall either be removed
or disposed of in such a manner that it lies on the ground and no part thereof extends
more than four (4) feet above the ground. Any debris that falls below the normal high-
water line of a water body or tributary stream shall be removed.
(d) Timber harvesting equipment shall not use stream channels as travel routes except
when:
(i) Surface waters are frozen; and
(ii) The activity will not result in any ground disturbance.
(e) All crossings of flowing water shall require a bridge or culvert, except in areas with
iow banks and channel beds which are composed of gravel, rock or similar hard surface
which would not be eroded or otherwise damaged.
(f) Skid trail approaches to water crossings shall be located and designed so as to prevent
water runoff from directly entering the water body or tributary stream. Upon completion
of timber harvesting, temporary bridges and culverts shall be removed and areas of
exposed soil revegetated.
(g) Except for water crossings, skid trails and other sites where the operation of
machinery used in timber harvesting results in the exposure of mineral soil shall be
located such that an unscarified strip of vegetation of at least seventy-five (75) feet,
horizontal distance, in width for slopes up to ten (10) percent shall be retained between
the exposed mineral soil and the normal high-water line of a water body or upland edge
of a wetland. For each ten (10) percent increase in slope, the unscarified strip shail be
increased by twenty (20) feet, horizontal distance. The provisions of this paragraph apply
only to a face sloping toward the water body or wetland, provided, however, that no
portion of such exposed mineral soil on a back face shall be closer than twenty five (25)
feet, horizontal distance, from the normal high-water line of a water body or upland edge
of a wetland.
Note: As indicated in Section 4(B) above, on the date that the statewide standards for
timber harvesting in the shoreland zone go into effect, the Town of Temple will no longer
have any responsibility for regulating timber harvesting in the shoreland zone, and that
responsibility will be assumed entirely by the State of Maine Department of
Conservation's Bureau of Forestry. The statewide standards that the Bureau of Forestry
will administer and enforce from that date forward are attached to this ordinance as
Appendix A.
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending 75 feet, horizontal distance, inland from the
normal high-water line, except hazard trees as described in Section Q.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
25
(2) Except in areas as described in Section P(1), above, within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water line of a great
pond GPA or a river flowing into a great pond classified GPA.within a strip extending
seventy-five (75) feet, horizontal distance, from any other water body, tributary stream, or
the upland edge of a wetland, a buffer strip of vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a single footpath not to exceed six (6)
feet in width as measured between tree trunks and/or shrub stems is allowed for
accessing the shoreline_provided that a cleared line of sight to the water through the
buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a great, shall be defined
as maintaining a rating score of 24 or more in each 25-foot by 50-foot rectangular (1250
square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above Points
Ground Level (inches)
2-<4in. 1
4-- <8 in. 2
8-< 12 in. 4
12 in. or greater 8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot
contains four (4) trees between 2 and 4 inches in diameter, two trees between 4
and 8 inches in diameter, three trees between 8 and 12 inches in diameter, and
two trees over 12 inches in diameter, the rating score is:
(4x1)4(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12
points (36- 24 =12) may be removed from the plot provided that no cleared
openings are created.
The following shail govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii)Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
26
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 '4) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three
(3) feet in height and other ground cover, including leaf litter and the forest duff layer,
shall not be cut, covered, or removed, except to provide for a footpath or other permitted
uses as described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
dead or hazard trees results in the creation of cleared openings, these openings
shall be replanted with native tree species in accordance with Section Q, below.unless
existing new tree growth is present.
_(f)In_order to maintain the vegetation in the shoreline buffer, clearing or
removal of vegetation for allowed activities, including associated construction and
related equipment operation, within or outside the shoreline buffer, must comply
with the requirements of Section 15.P(2).
Section 15(P)(2) does not apply to those portions of public recreational facilities adjacent
to public swimming areas as long as cleared areas are limited to the minimum area
necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond,
and seventy-five (75) feet, horizontal distance, from the normal high-water line of any other
water body, tributary stream, or the upland edge of a wetland, there shall be allowed on any
lot, in any ten (10) year period, selective cutting of not more than forty (40) percent of the
volume of trees four (4) inches or more in diameter, measured 4 1/2 feet above ground level.
Tree removal in conjunction with the development of permitted uses shall be included in the
forty (40) percent calculation. For the purposes of these standards volume may be considered
to be equivalent to basal area.
27
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet, whichever
is greater, including land previously cleared. This provision applies to the portion of alot
within the shoreland zone, including the buffer area, but shall not apply to the
General Development District.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
15 Q.Hazard Trees, Storm Damage Trees and Dead Tree Removal
(1) Hazard trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in cleared
opening in the tree canopy greater than_two hundred annd fifty (250) square feet,
replacement with native tree species is required, unless there is new growth already
present . New tree growth must ne as near as practicable wo where the hazard tree was
rwmoved and be at least two (2) inches in diameter, measured at the four and one half
(4.5) feet above the ground level. If new growth is not present, then replacement trees
shall consist of native species and be at least four (4) feet height . and be no less than
two(2) inches in diameter. Stumps may not be moved.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds
forty(40%) percent of the volumes of trees four(4) inches or more in diameter,
measured at four and one half (4.5) feet above ground level in any ten (10) year period,
and/or results in cleared openings exceeding twenty five (25%) percent of the lot area
within the shoreland zone, or ten thousand (10,000) square feet , whichever is greater,
replacemnetwith native trees species is required, unless there isnew tree growth already
present. New tree growth must be as near as practicable to where the hazard tree was
removed and be at leadst (2) inches in diameter, measured at four and one half (4.5)
about ground level. If new growth is not present, then replacement trees shall consist of
native species and be at least (2) inches in diamter, measured at four and one half (4.5)
feet above the ground level.
© The removal of standing trees, resulting from natural causes, is permissible with
out the need for replanting or a permit , as long as the removal does not result in the
creation oof new lawn areas, or permantly cleared areas, and stumps are not removed.
For the purposes _of this provision dead tress are those trees that contain no foliage
during the growing season.
(d) The Code Enforcement Officer may require the property owner to submit an
evaluation from a licensed forester or arborist before any hazard tree can be removed
within the shoreland zone.
28
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in
a cleared opening in the tree canopy greater than two hundred and fifty(250) square
feet, replanting is not require, but the area shall be required to naturally revegetate,
and the following requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new
lawn areas, or other permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed:
(iii) Limbs from a storm event may be pruned even lif they extend beyond the
bottom one-third (1/3) of the tree;and
(iv) If after one growing season, no natural regeneration or regrowth is present,
replanting of native tree seedlings or saplings is required at a density f one seedling per
every eighty (80) square feet of lost canopy.
(b)Outside the shoreline buffer, if the removal of storm-damaged trees exceeds 40%
of the volume of trees four (4) inches or more in diameter, measured at four and one
half (4.5) feet above the ground level in any ten (10) year period, or results, in the
aggregate, in cleared openings exceeding 25% of the lot area within the shoreland zone
or ten thousand (10,000) square feet, whichever is greater. and no natural regeneration
occurs within one growing season, then native tree seedlings or saplings shall be
replanted on a one -for-one basis.
R. Exemptions to Clearing and Vegation Removal; Requirements
The following activities are exempt from the clearing and vegetation removal standards
set forth in Section 15(P), provided that all othe applicable requirements of this chapter
are complied with, and the removal of vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two(2) years for the
maintenance of legally existing areas that do not comply with the vegetation standards
in this chapter, such as but not limited to cleared openings in the canopy of fields. Such
areas shall not be enlarged, except as allowed by this section. If any of these areas, due
to lack of removal of vegetation every two (2) years, reverts back to primarily woody
vegetation, the requirements of Section 15 (P) apply:
(2) The removal of vegetation from the location of allowed structures or allowed
uses, when the shoreline setback requirements of Section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated
within allowed public recreational facility;
29
(4) The removal of vegetation associated with allowed agricultural uses, provided
best management practices are utilized, and provided all requirements of Section 15(N)
are complied with;
(5) The removal of vegetation associated with brownfields or voluntary response
action program (VRAP) projects provided that the removal of vegetation is necessary
for remediation activities to clean-upo contamination on a site in general development
district , or other equivalent zoning district approved by the Commissioner that is part
of a state or federal brownfields program or a voluntary response action program
pursuant 38 M.R.S.A. Section 343-E, and that is located along a river that does not flow
to a great pond classified as GPA pursuant to 38 M.R.S.A. Section 465-A.
(6) The removal of non-native invasive species, provided the following minimum
requirements are met;
(a)If removal of vegetationoccures via wheeled or tracked motorized equipement,
the wheeled or tracked motorized equipement is operated and stored at least twenty-five
(25) feet, horizontal distance, from the shoreline, except that wheeled or tracked
equipement may be operated or stored on existing structural surfaces, such ad
pavement or gravel:
(b) Removal of vegetationwithin twenty-five (25) feet, horizontal, from the
shoreline occurs via hand tools;and
(c)If applicableclearing and vegetation removal standards are exceeded due to
the removal of non-native invasive species vegetation, the area shall be revegetated with
native species to achieve compliance.
(7) The removal of vegetation associated with emergency response activities conducted
by the Department, the U.S. Environmental Protection Agency and their agents.
S. Revegation Requirements
When revegation is required in response to violations of the vegetation staqndards set
forth in Section 15(P), to address the removal of non-native invasive species of
vegetationd, or as a mechanism to allow for development that may otherwise not be
permissiblendue to the vegetation standards, including removal of vegetation in
conjuction with a shoreline stabilization project, the reyegation must comply with the
following requirements.
(1) The property owner must submit a revegation plan, prepared with and signed by a
qualified professional , that describes revegation activities and maintenance. The plan
must includea scaled site plan , depicting where vegetation was, or is to be removed
.where existing vegetation is to remain, and where vegetation is to be planted,
including a list of all vegetation to be planted.
(2)Revegetation must occur along the same segment of shoreline and in the same area
where vegetation was removed and at the density comparable to the pre-excisting
vegetation, except where a shoreline stabilization activitydoes not allow revegation to
occur in the same area and at the density comparable to the pre-existing vegetation, in
30
which case revegation must occur along the same segment of shoreline and as close as
possible to the area where vegetation was removed:
(3) If part of a permitted activity, revegation shall occur before the expiration of the
permit. If the activity or revegation is not completed before the expirationof the permit,
a new vegetation plan shall be submitted with any renewal or new permit application.
(4) Revegation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native non-invasive
species;
(b) Replacement vegetation must ata minimum consist of saplings:
(c)If more than three (3) trees or saplings are planted, then at least three (3)
different species shall be used;
(d)No one species shall make up 50% or more of the number of trees and saplings
planted;
(e) If vegetation is required for a shoreline stabilization project, and it is not possible
to plant trees and saplings in the same area where trees or saplings were removed, then
trees or saplinhg must be planted in a location that effectively reestablishes the
screening between the shoreline and structures; and
(f) A survival rate of at least _eighty (80%) percent of the planted trees or saplings is
required for a minimum five (5) year period.
(5)Revegetation activities must meet the following requirements for woody vegetation
: and other vegetation under three (3) feet in height;
(a) All woody vegetation and vegetation under three (3) feet in height must be
replaced with native noninvasive species of woody vegetationand vegetation under three
(3) feet in height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted
in quantities and variety sufficient to prevent erosion and provide for effective
infiltration of stormwater:
; (c)If more than three (3) woody vegetation plants are to be planted, then at least
three (3) different species shall be planted;
(d)No one species shall make up 50% or more of the number of planted woody
vegetation plants; and
(e) Survival of planted woody vegetation and vegetation under three(3) feet in height
must be sufficient to remain in compliance with the standards contained within this
chapter for a minimum of five (5) years
(6) Revegation activities must meet the following requirements for ground vegetation
and ground cover:
3]
(a) All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and
provide for effective infiltration of stormwater;
(b) Where necessary due to lack of sufficient ground cover an area must be
supplemented with a minimum four(4) inch in depth of leaf mulch and/or bark mulch to
prevent erosion and provide for effective infiltration of stormwater;
© Survival and functionality\ of ground vegetation and ground cover Imust be
sufficient to remain in compliance with the standardss contained with in this chapter for
a minimum of five (5) years.
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which
result in unstabilized soil conditions and which require a permit shall also require a written
soil erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegation of distured soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
© Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with
the topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shat] be avoided wherever possible, and natural contours shall be followed as closely
as possible.
. (3) Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance, and shall be in operation during all stages of the activity.
The amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1)
week from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or
other effective measures. In all cases permanent stabilization shall occur within nine (9)
months of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five
hundred (500) square feet and shall be maintained until a catch of vegetation is
established.
(b) Anchoring the muich with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
32
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in order
to carry water from a twenty five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
U. Soils. All fand uses shall be located on soils in or upon which the proposed uses or structures
can be established or maintained without causing adverse environmental impacts, including
severe erosion, mass soil movement, improper drainage, and water pollution, whether during or
after construction. Proposed uses requiring subsurface waste disposal, and commercial or
industrial development and other similar intensive land uses, shall require a soils report based on
an on-site investigation and be prepared by state-certified professionals. Certified persons may
include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State
Certified Geologists and other persons who have training and experience in the recognition and
evaluation of soil properties. The report shall be based upon the analysis of the characteristics of
the soil and surrounding land and water areas, maximum ground water elevation, presence of
ledge, drainage conditions, and other pertinent data which the evaluator deems appropriate. The
soils report shall include recommendations for a proposed use to counteract soil limitations where
they exist.
_ V. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of
the
State any pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
- W. Archaeological Site. Any proposed land use activity involving structural development or soil
disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty (20) days
prior to action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or
reappointed annually by July Ist.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the
provisions of 30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions
of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first
obtaining a permit, engage in any activity or use of land or structure requiring a permit in the
33
. district in which such activity or use would occur; or expand, change, or replace an existing
use or structure; or renew a discontinued nonconforming use. A person who is issued a permit
pursuant to this Ordinance shall have a copy of the permit on site while the work authorized
by the permit is performed.
| . (1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being
replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the
water, and the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level |
or level 2 approved list, and unreasonable erosion and sedimentation is prevented by
means of adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit
required by other law or ordinance.
: C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site
plan, on a form provided by the municipality, to the appropriate official as indicated in
Section 14. .
(2) All applications shal! be signed by an owner or individual who can show evidence of
right, title or interest in the property or by an agent, representative, tenant, or contractor
of the owner with authorization from the owner to apply for a permit hereunder,
certifying that the information in the application is complete and correct.
(3) Ail applications shall be dated, and the Code Enforcement Officer or Planning Board,
as appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation approved by
the Plumbing Inspector, shall be submitted whenever the nature of the proposed structure
or use would require the installation of a subsurface sewage disposal system.
D. Procedure for Administering Permits. Within 35 days of the date of receiving a written
application, the Planning Board or Code Enforcement Officer, as indicated in Section 14, shall
notify the applicant in writing either that the application is a complete application, or, if the
application is incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall approve,
approve with conditions, or deny all permit applications in writing within 35 days of receiving a
completed application. However, if the Planning Board has a waiting list of applications, a
decision on the application shall occur within 35 days after the first available date on the Planning
Board's agenda following receipt of the completed application, or within 35 days of the public
34
hearing, if the proposed use or structure is found to be in conformance with the purposes and
provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive
plan;
(7) Will avoid problems associated with floodplain development and use; and
(8) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions
shall be stated in writing. No approval shall be granted for an application involving a
structure if the structure would be located in an unapproved subdivision or would violate any
other local ordinance, or regulation or statute administered by the municipality.
E. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial
start is not made in construction or in the use of the property during that period. If a
substantial start is made within one year of the issuance of the permit, the applicant shal! have
one additional year to complete the project, at which time the permit shall expire.
F. Installation of Public Utility Service. A public utility, water district, sanitary district or any
utility company of any kind may not install services to any new structure located in the
shoreland zone unless written authorization attesting to the validity and currency of all local
permits required under this or any previous Ordinance has been issued by the appropriate
municipal officials or other written arrangements have been made between the municipal
officials and the utility.
G. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the
following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate
basis, where it is alleged by an aggrieved party that there is an error in any order,
35
requirement, decision, or determination made by, or failure to act by, the Planning Board
in the administration of this Ordinance; and to hear and decide administrative appeals on
a de novo basis where it is alleged by an aggrieved party that there is an error in any
order, requirement, decision or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application under this
Ordinance. Any order, requirement, decision or determination made, or failure to act, in
the enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set
forth in this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not
limited to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by
this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for
the specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue
hardship. The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the
locality; and
d. That the hardship is not the result of action taken by the applicant or a prior
owner.
(d) Notwithstanding Section 16(H){2)(c)(ii) above, the Board of Appeals may grant a
variance to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the dwelling. The
board shall restrict any variance granted under this subsection solely to the installation of
equipment or the construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to the time
a that the person with the disability lives in the dwelling. The term "structures necessary
for access to or egress from the dwelling" shall include railing, wall or roof systems
necessary for the safety or effectiveness of the structure.
36
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order
to ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shail hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board
of Appeals shall hear and decide the matter afresh, undertaking its own independent analysis
of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shail hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the
decision was contrary to specific provisions of the Ordinance or contrary to the facts
presented to the Planning Board. The Board of Appeals may only review the record of the
proceedings before the Planning Board. The Board Appeals shail not receive or consider any
evidence which was not presented to the Planning Board, but the Board of Appeals may
receive and consider written or oral arguments. If the Board of Appeals determines that the
record of the Planning Board proceedings are inadequate, the Board of Appeals may remand
the matter to the Planning Board for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a
written notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the
appeal or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
37
(iii) Upon receiving an application for an administrative appeal or a variance, the
Code Enforcement Officer or Planning Board, as appropriate, shall transmit to the
Board of Appeals all of the papers constituting the record of the decision appealed
from.
(iv) The Board of Appeals shail hoid a public hearing on an administrative appeal or
a request for a variance within thirty-five (35) days of its receipt of a complete
written application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within
thirty five (35) days after the close of the hearing, and shall issue a written decision
on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including
a statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7) days
of the Board's decision. Copies of written decisions of the Board of Appeals shall
be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
agerieved party who participated as a party during the proceedings before the Board of
Appeals may take an appeal to Superior Court in accordance with State laws within forty-five
. (45) days from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of
Appeals may reconsider any decision within forty-five (45) days of its prior decision. A
request to the Board to reconsider a decision must be filed within ten (10) days of the
decision that is being reconsidered. A vote to reconsider and the action taken on that
reconsideration must occur and be completed within forty-five (45) days of the date of the
vote on the original decision. Reconsideration of a decision shall require a positive vote of
the majority of the Board members originally voting on the decision, and proper notification
to the landowner, petitioner, planning board, code enforcement officer, and other parties of
interest, including abuttors and those who testified at the original hearing(s). The Board may
conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
H. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
38
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person responsible for
such violation, indicating the nature of the violation and ordering the action necessary to
correct it, including discontinuance of illegal use of land, buildings or structures, or work
being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be
, maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance
with all applicable laws and conditions attached to permit approvals. The Code
Enforcement Officer shall also investigate all complaints of alleged violations of this
Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential
transactions of the office, including applications submitted, permits granted or denied,
variances granted or denied, revocation actions, revocation of permits, appeals, court
actions, violations investigated, violations found, and fees collected. On a biennial basis,
a summary of this record shall be submitted to the Director of the Bureau of Land and
Water Quality within the Department of Environmental Protection.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings,
either legal or equitable, including seeking injunctions of violations and the imposition of
fines, that may be appropriate or necessary to enforce the provisions of this Ordinance in the
name of the municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements shall
not allow an illegal structure or use to continue unless there is clear and convincing evidence
that the illegal structure or use was constructed or conducted as a direct result of erroneous
advice given by an authorized municipal official and there is no evidence that the owner acted
in bad faith, or unless the removal of the structure or use will result in a threat or hazard to
public health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
17. Definitions.
Accessory structure or use - a use or structure which is incidental and subordinate to the principal
use or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the
lot. A deck or similar extension of the principal structure or a garage attached to the principal
structure by a roof or a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the
granting or denial of a permit or variance under this Ordinance; a person whose land abuts land
for which a permit or variance has been granted; or any other person or group of persons who
have suffered particularized injury as a result of the granting or denial of such permit or variance.
39
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy
products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and
greenhouse products. Agriculture does not include forest management and timber harvesting
activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive
of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for vehicles
and trailers.
Bureau of Forestry- State of Maine Department of Agriculture, Conservation, and Forestry,
Campground - any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy -- the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the buying
and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling
units.
Development -- a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
ee Driveway - a vehicular access-way less than five hundred (500) feet in length serving two
singlefamily dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare,
such as protection of resources from immediate destruction or loss, law enforcement, and
operations to rescue human beings, property and livestock from the threat of destruction or injury.
40
Essential services - gas, electrical or communication facilities, steam, fuel, electric power or
water transmission or distribution lines, towers and related equipment; telephone cables or lines,
poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage
lines, collection or supply systems; and associated storage tanks. Such systems may include
towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes,
traffic signals, hydrants and similar accessories, but shall not include service drops or buildings
which are necessary for the furnishing of such services.
Expansion of a structure - an increase in the footprint or height of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of
7 footprint of a structure or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls,
Footprint- the entire area of ground ccovered by the structure(s) on a lot, including but not
limited to eantileverd or similar overhanging extension, as well as unenclosed structures,
such as patios and decks
Forest management activities - timber cruising and other forest resource evaluation activities,
pesticide or fertilizer application, management planning activities, timber stand improvement,
pruning, regeneration of forest stands, and other similar or associated activities, exclusive of
timber harvesting and the construction, creation or maintenance of roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frostwalls, or other base consisting of concrete,
block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in access of 10 acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain smal! stream channels or inclusions of land that do not conform
to the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location
on
41
submerged lands or that require direct access to, or location in, coastal or inland waters and that
can not be located away from these waters. The uses include, but are not limited to commercial
and recreational fishing and boating facilities, finfish and shellfish processing, fish related
storage and retail and wholesale fish marketing facilities, waterfront dock and port facilities,
shipyards and boat building facilities, marinas, navigation aids, basins and channels, shoreline
structures necessary for erosion control purposes, industrial uses dependent upon water-borne
transportation or requiring large volumes of cooling or processing water that can not reasonably
be located or operated at an inland site, and uses that primarily provide general public access to
coastal or inland waters.Recreational boat storage buildings are not considered to be
functionality water dependent use.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed
or increased inland body of water is completely surrounded by land held by a single owner,
Ground cover -- small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree- a tree with the structural defect, combination of defects, or disease resulting in
a structural defect that unde the normal range of environmental conditions at the site
exhibits a high probability of failure and loss of a major structural component of the tree in
a manner that will strike a target. A normal range of environmental conditions does not
include meteorological anomalies such as, but not limited to: hurricances, hurricane force
winds, tornadoes, microbursts or significant ice storm events
Hazard trees also include those trees that pose a serious and imminent risk to bank
stability. A target is the area where personal injury or property damage could occur if the
tree or a potion of the tree fails. Targets inclides roads, driveway, parking areas, structure,
campsites, and any other developed are where people frequently gather and linger.
Height of a structure - the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no more
than two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
coverage, or increase in height of a structure. Property changes or structure expansions which
either meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing nonconforming structure. Hence, a structure may be
expanded laterally provided that the expansion extends no closer to the water body, tributary
stream, or wetland than the closest portion of the existing structure from that water body,
42
; / tributary stream, or wetland. Included in this allowance are expansions which in-fill irregularly
a shaped structures.
_ Individual private campsite - an area of land which is not associated with a campground, but
. which is developed for repeated camping by only one group not to exceed ten (10) individuals
and which involves site improvements which may include but not be limited to a gravel pad,
parking area, fire place, or tent platform.
. Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Institutional -- a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipaily owned or operated building, structure or land used for
public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
; normal high-water line of a water body or upland edge of a wetland and areas beneath roads
a serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more
than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction
site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot
lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling
units.
a Native -- indigenous to the local forests.
Non-conforming condition -- non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took
effect.
43
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment
of this Ordinance, does not meet the area, frontage, or width requirements of the district in which
it is located.
Non-conforming structure- a structure which does not meet any one or more of the
following dimensional requirements; setback height, lot coverage or footprint, but which
is allowed solely because it was in lawful existence at the time this Ordinance or
subsequent amendments took effect.
Non-evasive species of vegetation-species of vegetation listed in the Maine
department of Agriculture, Conservation and Forestry as being invasive in Maine
ecosystems and not native to Maine ecosystem.
Normal high-water line - that line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water or changes in vegetation, and which
distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with great ponds that support non-forested wetland vegetation and hydric soils and
that are at the same or lower elevation as the water level of the great pond during the period of
normal high-water are considered part of the great pond.
Outlet stream- any perennial or intermittent stream, as shown on the most recent
highest resolution version of the national hydrography database available from the
United States Geological Survey on the website of the United States Geological
Survey or the national map, that flows from a freshwater wetland,
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the normal
high-water line or within a wetland.
Temporary: Structures which remain in or over the water for less than seven (7) months
in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or more in
any period of twelve (12) consecutive months.
Principal structure- a. structure other than one which is used for purposes wholly
incidental or accessory to the use of another structure or use on the same lof.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same lot
Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body or
public entity.
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
- 44
. Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed
for temporary sleeping or living quarters for one or more persons, and which may include a pick-
up camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use
as permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees remaining on a harvested site.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Sapling- a tree species that is less than two(2) inches in diameter at four and one
half (4.5) feet above ground level.
Seedling-a young tree species that is less than four and one half (4.5) feet above
ground level.
: Service drop - any utility line extension which does not cross or run beneath any portion of a
water body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely
upon the premises of the customer requesting service or upon a roadway right-of-
way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service |
a. the extension, regardless of length, will be made by the installation of
telephone wires to existing utility poles, or
45
b. the extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking
space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of any great pond; within 250 feet, horizontal distance, of
the upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of
, the normal high-water line of a stream.
Shoreline -- the normal high-water line, or upland edge of a freshwater wetland.
, Skid trail -- a route repeatedly used by forwarding machinery or animai to haul or drag forest
products from the stump to the yard or landing, the construction of which requires minimal
excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent edition of a United States Geological Survey 7.5
minute series topographic map, or if not available, a 15-minute series topographic map, to the
point where the body of water flows to another water body or wetland within the shoreland area.
Storm-damaged tree- a tree that has been uprooted, blown down, is lying on the
ground, or that remains standing and is damaged beyond the point of recovery as a
result of a storm event.
Stream- a free-flowing body of water from the outlet of a great pond or confluence of
two (2) perennial streams as depicted on the most recent, highest resolution version of
the national hydrography database available from the United States Geological
Survey_on the website of the United States Geological Survey or national map to the
point where stream becomes a river or where the stream meets the shoreland zone of
a water body or wetland and a channel forms downstream of the water body or
wetland as an outlet, that channel is also a stream,
Structure- anything temporarily or permanently located, built, constructed or
erected for the support, shelter or enclosure of persons, animals, goods of property_of any
kind or anything constructed or erected on or in the ground. This term includes structures
temporarily or permanently located, such as decks, patios, and satellite dishes. Structure
does not include fences, poles and wiring and other aerial equipment normally
associated with service drops, including guy wires and guy anchors; subsurface
water waste disposal systems as defined in Title 32, section 4201-E, subsection 5;
geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection 3-C; or
wells or water wells as defined in Title 32, section 4700-E, subsection 8
. 46
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system -- any system designed to dispose of waste or waste water on -
or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not include any discharge system licensed
under 38 M.R.S.A. section 414, any surface waste water disposal system, or any municipal or
quasi-municipal sewer or waste water treatment system.
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Timber harvesting- the cutting and removal of timber for the primary purpose of selling
or processing forest products. "Timber harvesting "does not include the cutting or
removal of vegetation within the shoreland zone when associated with any other use
land use activities. The cutting or removal of trees in the shoreland zone on a lot that has
less than two (2) acres within the shoreland zone shall not be considered timber
harvesting. Such cutting or removalof trees shall be regulated pursuant to Section 15 (P),
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting.
Tree-a woody perennial plant with well-defined trunk(s) at least two (2) inches in
diameter at four and one half (4.5) feet above the ground, with a more or less
defined crown, and reaching a height of at least ten (10) feet at maturity.
Tributary stream -- means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with other water bodies. "Tributary stream" does not include rills or
gullies forming because of accelerated erosion in disturbed soils where the natural vegetation
cover has been removed by human activity.
7 This definition does not include the term "stream" as defined elsewhere in this Ordinance, and
only applies to that portion of the tributary stream located within the shoreland zone of the
receiving water body or wetland.
. NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes ofa
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty (20) feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over
and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
47
Water body - any great pond or stream.
Water crossing - any project extending from one bank to the opposite bank of a stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and
cables as well as maintenance work on these crossings. This definition includes crossings for
timber harvesting equipment and related activities.
Wetland - a freshwater wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
| APPENDIX A
Timber Harvesting -- Statewide Standards [Effective on effective date established in
Section 4(B)]
(1) Shoreline integrity and sedimentation. Persons conducting timber harvesting
and related activities must take reasonable measures to avoid the disruption of
shoreline integrity, the occurrence of sedimentation of water, and the disturbance of
water body and tributary stream banks, water body and tributary stream channels,
shorelines, and soil lying within water bodies, tributary streams and wetlands. If,
despite such precautions, the disruption of shoreline integrity, sedimentation of water,
or the disturbance of water body and tributary stream banks, water body and tributary
stream channels, shorelines, and soil lying within water bodies, tributary streams and
wetlands occurs, such conditions must be corrected.
(2) Slash treatment. Timber harvesting and related activities shall be conducted such that
slash or debris is not left below the normal high-water line of any water body or
tributary stream, or the upland edge of a wetland. Section 15(O-1)(2) does not apply
to minor, incidental amounts of slash that result from timber harvesting and related
activities otherwise conducted in compliance with this section.
(a) Slash actively used to protect soil from disturbance by equipment or to stabilize
exposed soil, may be left in place, provided that no part thereof extends more
than 4 feet above the ground.
(b) Adjacent to great ponds, rivers and wetlands: .
(i) No accumulation of slash shall be left within 50 feet, horizontal distance, of
the normal high-water line or upland edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of the normal high-water
line or upland edge of a wetland, all slash larger than 3 inches in diameter
48
must be disposed of in such a manner that no part thereof extends more than
4 feet above the ground.
(3) Timber harvesting and related activities must leave adequate tree cover and shall be
conducted so that a well-distributed stand of trees is retained. This requirement may
be satisfied by following one of the following three options:
(a) Option 1 (40% volume removal), as follows:
(i) Harvesting of no more than 40 percent of the total volume on each acre of
trees 4.5 inches DBH or greater in any 10 year period is allowed. Volume
may be considered to be equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation
including existing ground cover, must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers,
streams, and great ponds, and within 75 feet, horizontal distance, of the
upland edge of a wetland, there must be no cleared openings. At distances
greater than 75 feet, horizontal distance, of the normal high-water line of a
river or great pond or upland edge of a wetland, timber harvesting and related
activities must not create single cleared openings greater than 14,000 square
feet in the forest canopy. Where such openings exceed 10,000 square feet,
they must be at least 100 feet, horizontal distance, apart. Such cleared
openings will be included in the calculation of total volume removal.
Volume may be considered equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of at least 60 square feet
per acre of woody vegetation greater than or equal to 1.0 inch DBH, of which
40 square feet per acre must be greater than or equal to 4.5 inches DBH;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation
including existing ground cover, must be maintained; and,
(iii)Within 75 feet, horizontal distance, of the normal high-water line of water
bodies and within 75 feet, horizontal distance, of the upland edge of
wetlands, there must be no cleared openings. At distances greater than 75
feet, horizontal distance, of the normal high-water line of a river or great
pond, or upland edge of a wetiand, timber harvesting and related activities
must not create single cleared openings greater than 14,000 square feet in the
forest canopy. Where such openings exceed 10,000 square feet, they must be
at least 100 feet, horizontal distance, apart. Such cleared openings will be
. included in the calculation of the average basal area. Volume may be
considered equivalent to basal area.
(c) Option 3 (Outcome based), which requires: An alternative method proposed in an
application, signed by a Licensed Forester or certified wildlife professional,
submitted by the landowner or designated agent to the State of Maine
Department of Conservation's Bureau of Forestry (Bureau) for review and
49
approval, which provides equal or better protection of the shoreland area than
this rule.
Landowners must designate on the Forest Operations Notification form required by 12
M.R.S.A. chapter 805, subchapter 5 which option they choose to use. If landowners
choose Option | or Option 2, compliance will be determined solely on the criteria for the
option chosen. If landowners choose Option 3, timber harvesting and related activities
may not begin until the Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is
retained through a field procedure that uses sample plots that are located randomly or
systematically to provide a fair representation of the harvest area.
(4) Skid trails, yards, and equipment operation. This requirement applies to the construction,
maintenance, and use of skid trails and yards in shoreland areas.
(a) Equipment used in timber harvesting and related activities shall not use river, stream.
or tributary stream channels as travel routes except when surface waters are frozen
and snow covered, and the activity will not result in any ground disturbance.
(b) Skid trails and yards must be designed and constructed to prevent sediment and
concentrated water runoff from entering a water body, tributary stream, or wetland.
Upon termination of their use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet,
horizontal distance, of any water body, tributary stream, or wetland. On slopes
of 10 percent or greater, the setback for equipment operation must be increased
_ by 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for
each 5 percent increase in slope above 10 percent. Where slopes fall away from
the resource, no increase in the 25-foot setback is required.
(ii) Where such setbacks are impracticable, appropriate techniques shall be used to
avoid sedimentation of the water body, tributary stream or wetland. Such
techniques may include the installation of sump holes or settling basins, and/or
the effective use of additional ditch relief culverts and ditch water turnouts placed
to avoid sedimentation of the water body, tributary stream, or wetland. If, despite
such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to crossings of
water bodies, tributary stream channels, and wetlands, ditches and other related
structures, must be designed, constructed, and maintained to prevent sediment and
concentrated water runoff from directly entering the water body, tributary stream or
wetland. Surface water on or adjacent to water crossing approaches must be diverted
through vegetative filter strips to avoid sedimentation of the watercourse or wetland.
Because roadside ditches may not extend to the resource being crossed, vegetative filter
strips must be established in accordance with the setback requirements in Section 15(O-1)
_ (7) of this rule.
50
(a) Land management roads and associated ditches, excavation, and fill must be set back
at least:
(i) 100 feet, horizontal distance, from the normal high-water line of a great pond,
river or wetland;
(ii) 50 feet, horizontal distance, from the normal high-water line of streams; and
(iii)25 feet, horizontal distance, from the normal high-water line of tributary streams
(b) The minimum 100 foot setback specified in Section 15(O-1)(5){a)(i) above may be
reduced to no less than 50 feet, horizontal distance, and the 50 foot setback specified
in Section 15(O-1)(5)(a)(ii) above may be reduced to no less than 25 feet, horizontal
distance, if, prior to construction, the landowner or the landowner's designated agent
demonstrates to the Planning Board's satisfaction that no reasonable alternative exists
and that appropriate techniques will be used to prevent sedimentation of the water
body, tributary stream, or wetland. Such techniques may include, but are not limited
to, the installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water body, tributary
stream or wetland. If, despite such precautions, sedimentation or the disruption of
shoreline integrity occurs, such conditions must be corrected.
(c) On slopes of 10 percent or greater, the land management road setback must be
increased by at least 20 feet, horizontal distance, plus an additional 10 feet, horizontal
distance, for each 5 percent increase in slope above 10 percent.
(d) New land management roads are not allowed within the shoreland area along
Significant River Segments as identified in 38 M.R.S.A. section 437, nor in a
Resource Protection District, unless, prior to construction, the landowner or the
landowner's designated agent makes a clear demonstration to the Planning Board's
satisfaction that no reasonable alternative route exists outside the shoreland zone, and
that the new road must be set back as far as practicable from the normal high-water
line and screened from the river by existing vegetation.
(e) Ditches, culverts, bridges, dips, water turnouts and other water control installations
associated with roads must be maintained on a regular basis to assure effective
functioning. Drainage structures shall deliver a dispersed flow of water into an
unscarified filter strip no less than the width indicated in the setback requirements in
Section 15(O-1)(7). Where such a filter strip is impracticable, appropriate techniques
shall be used to avoid sedimentation of the water body, tributary stream, or wetland.
Such techniques may include the installation of sump holes or settling basins, and/or
the effective use of additional ditch relief culverts and ditch water turnouts placed to
avoid sedimentation of the water body, tributary stream, or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water control installations
required in Section 15(O-1)(5)(e) must continue until use of the road is discontinued
and the road is put to bed by effective installation of water bars or other adequate
road drainage structures at appropriate intervals, constructed to avoid surface water
51
flowing over or under the water bar, and extending a sufficient distance beyond the
traveled way so that water does not reenter the road surface.
(g) Upgrading existing roads. Extension or enlargement of presently existing
roads must conform to the provisions of Section 15(O-1). Any nonconforming
existing
road may continue to exist and to be maintained, as long as the nonconforming
conditions are not made more nonconforming.
(h) Exception. Extension or enlargement of presently existing roads need not conform
to the setback requirements of Section 15(O-1)(5)(a) if, prior to extension or
enlargement, the landowner or the landowner's designated agent demonstrates to the
Planning Board's satisfaction that no reasonable alternative exists and that
appropriate techniques will be used to prevent sedimentation of the water body,
tributary stream, or wetland. Such techniques may include, but are not limited to, the
installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water body, tributary
stream, or wetland. If, despite such precautions, sedimentation or the disruption of
shoreline integrity occurs, such conditions must be corrected.
(i) Additional measures. In addition to the foregoing minimum requirements,
persons undertaking construction and maintenance of roads and river, stream and
tributary stream crossings must take reasonable measures to avoid sedimentation of
surface waters.
(6) Crossings of waterbodies. Crossings of rivers, streams, and tributary streams must allow
for fish passage at all times of the year, must not impound water, and must allow for the
maintenance of normal flows.
(a) Determination of flow. Provided they are properly applied and used for the
circumstances for which they are designed, methods including but not limited to the
following are acceptable as a means of calculating the 10 year and 25 year frequency
water flows and thereby determining water crossing sizes as required in Section
15(O-1): The United States Geological Survey (USGS) Methods; specifically:
Hodgkins, G. 1999. Estimating the Magnitude of Peak Flows for Streams in Maine
for Selected Recurrence Intervals. U.S. Geological Survey. Water Resources
Investigations Report 99-4008. 45 pp.
(b) Upgrading existing water crossings. Extension or enlargement of presently existing
water crossings must conform to the provisions of Section 15(O-1). Any
nonconforming existing water crossing may continue to exist and be maintained, as
long as the nonconforming conditions are not made more nonconforming; however,
any maintenance or repair work done below the normal high-water line must conform
to the provisions of Section 15(O-1).
(c) Other Agency Permits. Any timber harvesting and related activities involving the
design, construction, and maintenance of crossings on waterbodies other than a river,
stream or tributary stream may require a permit from the Land Use Regulation
Commission, the Department of Environmental Protection, or the US Army Corps of
Engineers.
52
(d) Any timber harvesting and related activities involving the design, construction, and
maintenance of crossings of wetlands identified by the Department of Inland
Fisheries and Wildlife as essential wildlife habitat require prior consultation with the
Department of Inland Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water crossing construction
maintenance, alteration and replacement activities in shoreland areas must be given
to the Bureau prior to the commencement of such activities. Such notice must
contain all information required by the Bureau, including:
(i) amap showing the location of all proposed permanent crossings;
(ii) the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a permit from state
or federal agencies, a copy of the approved permit or permits; and
(iv) a statement signed by the responsible party that all temporary and
permanent crossings will be constructed, maintained, and closed out in
accordance with the requirements of this Section.
(f) Water crossing standards. All crossings of rivers require a bridge or culvert sized
according to the requirements of Section 15(O-1)(6)(g)) below. Streams and tributary
streams may be crossed using temporary structures that are not bridges or culverts
provided:
(i) concentrated water runoff does not enter the stream or tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
(iii) there is no substantial disturbance of the bank, or stream or tributary stream
channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded.
Subject to Section 15(O-1)(6)(f)G-v) above, skid trail crossings of streams and
tributary streams when channels of such streams and tributary streams are frozen and
snow-covered or are composed of a hard surface which will not be eroded or
otherwise damaged are not required to use permanent or temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream
channels with a bridge or culvert, the following requirements apply:
(i) Bridges and culverts must be installed and maintained to provide an opening
sufficient in size and structure to accommodate 10 year frequency water flows or
with a cross-sectional area at least equal to 2 1/2 times the cross-sectional area of
the river, stream, or tributary stream channel.
(ii) Temporary bridge and culvert sizes may be smaller than provided in Section
15(O-1)(6)(g)(i) if techniques are effectively employed such that in the event of
culvert or bridge failure, the natural course of water flow is maintained and
sedimentation of the water body or tributary stream is avoided. Such crossing
structures must be at least as wide as the channel and placed above the normal
high-water line. Techniques may include, but are not limited to, the effective use
of any, a combination of, or afl of the following:
1. use of temporary skidder bridges;
53
2. removing culverts prior to the onset of frozen ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream crossings must:
1. be installed at or below river, stream or tributary stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of the culvert;
4. be covered by soil to a minimum depth of 1 foot or according to the
culvert manufacturer's specifications, whichever is greater; and
5. have a headwall at the inlet end which is adequately stabilized by riprap
or other suitable means to reasonably avoid erosion of material around
the culvert.
(iv)River, stream and tributary stream crossings allowed under Section 15(O-1), but
located in flood hazard areas (i.e. A zones) as identified on a community's Flood
Insurance Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be
designed and constructed under the stricter standards contained in that
community's National Flood Insurance Program (NFIP). For example, a water
. crossing may be required to pass a 100-year flood event.
(v) Exception. Skid trail crossings of tributary streams within shoreland areas and
wetlands adjacent to such streams may be undertaken in a manner not in
conformity with the requirements of the foregoing subsections provided persons
conducting such activities take reasonable measures to avoid the disruption of
shoreline integrity, the occurrence of sedimentation of water, and the disturbance
of stream banks, 'stream channels, shorelines, and soil lying within ponds and
wetlands. If, despite such precautions, the disruption of shoreline integrity,
sedimentation of water, or the disturbance of stream banks, stream channels,
shorelines, and soil lying within ponds and wetlands occurs, such conditions
must be corrected.
(h) Skid trail closeout. Upon completion of timber harvesting and related activities, or
upon the expiration of a Forest Operations Notification, whichever is earlier, the
following requirements apply:
(i) Bridges and culverts installed for river, stream and tributary stream crossings by
skid trails must either be removed and areas of exposed soil stabilized, or
upgraded to comply with the closeout standards for land management roads in
Section 15(O-1)(6)(i) below.
(ii) Water crossing structures that are not bridges or culverts must either be removed
immediately following timber harvesting and related activities, or, if frozen into
the river, stream or tributary stream bed or bank, as soon as practical after
snowmelt.
(iii)River, stream and tributary stream channels, banks and approaches to crossings
of water bodies and tributary streams must be immediately stabilized on
completion of harvest, or if the ground is frozen and/or snow-covered, as soon as
practical after snowmelt. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be corrected.
54
(i) Land management road closeout. Maintenance of the water control features must
continue until use of the road is discontinued and the road is put to bed by taking the
following actions:
(i) Effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to reasonably avoid surface water flowing over
or under the water bar, and extending sufficient distance beyond the traveled way
so that water does not reenter the road surface.
(ii) Water crossing structures must be appropriately sized or dismantled and removed
in a manner that reasonably avoids sedimentation of the water body or tributary
stream.
(iii) Any bridge or water crossing culvert in roads to be discontinued shall satisfy one
of the following requirements:
1. it shall be designed to provide an opening sufficient in size and structure to
accommodate 25 year frequency water flows;
2. it shall be designed to provide an opening with a cross-sectional area at least
3 1/2 times the cross-sectional area of the river, stream or tributary stream
channel; or
3, it shall be dismantled and removed in a fashion to reasonably avoid
sedimentation of the river, stream or tributary stream.
If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
(7) Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained
as specified in Section 15(O-1), but in no case shal{ be less than shown in the following
table.
Average slope of land between exposed mineral
Width of strip between exposed
soil and the shoreline (percent)
mineral soil and shoreline
(feet along surface of the ground)
0 25
10 45
20 65
30 85
40 105
50 125
55
60 145
70 165
56