This is the exact embedded text of the captured official document.
Snapshot 79be6577f1c4 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 1 of 48
Thorndike Shoreland Zoning Ordinance
(Enacted on 3/18/17)
Table of Contents
1.
Purposes. ............................................................................................................................................... 3
2.
Authority ............................................................................................................................................... 3
3.
Applicability. .......................................................................................................................................... 3
4.
Effective Date of Ordinance and Ordinance Amendments ................................................................... 3
5.
Availability. ............................................................................................................................................ 4
6.
Severability. ........................................................................................................................................... 4
7.
Conflicts with Other Ordinances ........................................................................................................... 4
8.
Amendments. ........................................................................................................................................ 4
9.
Districts and Zoning Map ...................................................................................................................... 4
A.
Official Shoreland Zoning Map .................................................................................................................... 4
B.
Scale of Map ................................................................................................................................................ 4
C.
Certification of Official Shoreland Zoning Map ........................................................................................... 4
D.
Changes to the Official Shoreland Zoning Map ........................................................................................... 4
10. Interpretation of District Boundaries ................................................................................................... 5
11. Land Use Requirements ....................................................................................................................... 5
12. Nonconformance ................................................................................................................................. 5
A.
Purpose ....................................................................................................................................................... 5
B.
General ........................................................................................................................................................ 5
C.
Nonconforming Structures .......................................................................................................................... 5
(1) Expansions ............................................................................................................................................. 5
(2) Foundations ........................................................................................................................................... 7
(3) Relocation .............................................................................................................................................. 7
(4) Reconstruction or Replacement ............................................................................................................ 8
(5) Change of Use of a Nonconforming Structure ....................................................................................... 9
D.
Nonconforming Uses ................................................................................................................................... 9
E.
Nonconforming Lots .................................................................................................................................... 9
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 2 of 48
13. Establishment of Districts .................................................................................................................. 10
A.
Resource Protection District ...................................................................................................................... 10
B.
Limited Commercial District ...................................................................................................................... 11
C.
Stream Protection District. ........................................................................................................................ 11
14. Table of Land Uses. ............................................................................................................................ 12
15. Land Use Standards. ........................................................................................................................... 14
A.
Minimum Lot Standards ............................................................................................................................ 14
B.
Principal and Accessory Structures ........................................................................................................... 15
C.
Campgrounds. ........................................................................................................................................... 18
D.
Individual Private Campsites. .................................................................................................................... 18
E.
Commercial and Industrial Uses. ............................................................................................................... 19
F.
Parking Areas ............................................................................................................................................. 20
G.
Roads and Driveways. ............................................................................................................................... 20
H.
Signs. ......................................................................................................................................................... 22
I.
Storm Water Runoff .................................................................................................................................. 22
J.
Septic Waste Disposal ............................................................................................................................... 23
K.
Essential Services ....................................................................................................................................... 23
L.
Mineral Exploration and Extraction. .......................................................................................................... 23
M.
Agriculture ................................................................................................................................................. 24
N.
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting ..................................... 25
O.
Hazard Trees, Dead Trees and Storm--Damaged Trees .............................................................................. 27
P.
Exemptions to Section 15(O) ..................................................................................................................... 28
Q.
Revegetation Requirements ...................................................................................................................... 30
R.
Erosion and Sedimentation Control .......................................................................................................... 31
S.
Soils ........................................................................................................................................................... 32
T.
Water Quality. ........................................................................................................................................... 33
U.
Archaeological Site. ................................................................................................................................... 33
16. Administration ................................................................................................................................... 33
A.
Administering Bodies and Agents .............................................................................................................. 33
B.
Fees Authorized ......................................................................................................................................... 33
C.
Permits Required. ...................................................................................................................................... 33
D.
Permit Application ..................................................................................................................................... 34
E.
Procedure for Administering Permits. ....................................................................................................... 34
F.
Special Exceptions. .................................................................................................................................... 35
G.
Expiration of Permit. ................................................................................................................................. 36
H.
Installation of Public Utility Service. .......................................................................................................... 36
I.
Appeals ...................................................................................................................................................... 36
J.
Enforcement .............................................................................................................................................. 40
17. Definitions .......................................................................................................................................... 41
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 3 of 48
1. Purposes.
The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect commercial fishing and maritime industries; to
protect freshwater wetlands; to control building sites, placement of structures and land uses; to
conserve shore cover, and visual as well as actual points of access to waters; to conserve natural
beauty and open space; and to anticipate and respond to the impacts of development in shoreland
areas.
This Ordinance is designed to implement the goals in the Town's 1991 Comprehsneive Plan,
specifically to "foster and encourage entrepreneurship and small business development", and
"protect natural resources with a minimum of new local regulation." As such, within the parameters
of the State of Maine Guidelines for Municipal Zoning Ordinances, this Ordinance allows for light
commercial and residential development within the shoreland zone surrounding the Town's river
and wetlands, except where required to be in Resource Protection due to flood hazard or foreseted
wetland areas of 2 acres or greater. Also in accordance with the Comprehensive Plan, this Ordinance
affords protection for fisheries habitat in the streams required to be zoned by State law as depicted
in Section 3 below.
2. Authority.
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435--448 of
the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability.
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the normal high--
water line of great ponds; within 250 feet, horizontal distance, of the normal high--water line of
rivers; within 250 feet, horizontal distance, of the upland edge of a freshwater wetland; and within
75 feet, horizontal distance, of the normal high--water line of a stream.
NOTE: Terms are defined in Section 17, including but not limited to: freshwater wetland, great
pond, river and stream.
4. Effective Date of Ordinance and Ordinance Amendments.
This Ordinance, as adopted by the municipal legislative body on March 18, 2017, shall not be
effective unless approved by the Commissioner of the Department of Environmental Protection. A
certified copy of the Ordinance, or Ordinance Amendment, attested and signed by the Municipal
Clerk, shall be forwarded to the Commissioner for approval. If the Commissioner fails to act on this
Ordinance or Ordinance Amendment, within forty--five (45) days of his/her receipt of the Ordinance,
or Ordinance Amendment, it shall be automatically approved. Any application for a permit
submitted to the municipality within the forty--five (45) day period shall be governed by the terms of
this Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance Amendment, is approved
by the Commissioner.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 4 of 48
5. Availability.
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
6. Severability.
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances.
The provisions of this Ordinance within the Shoreland Zone are in addition to requirements of the
Thorndike Land Use Ordinance and all other applicable townwide ordinances. Whenever a provision
of this Ordinance conflicts with or is inconsistent with another provision of this Ordinance or of any
other ordinance, regulation or statute administered by the municipality, the more restrictive
provision shall control.
8. Amendments.
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments,
attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body and
shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on any
amendment within forty--five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty--
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map.
A. Official Shoreland Zoning Map.
The areas to which this Ordinance is applicable are hereby divided into the following districts as
shown on the Official Shoreland Zoning Map which is made a part of this Ordinance:
(1) Resource Protection District
(2) Limited Commercial District
(3) Stream Protection District
B. Scale of Map.
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000 feet.
District boundaries shall be clearly delineated and a legend indicating the symbols for each
district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map.
The Official Shoreland Zoning Map shall be certified by the attested signature of the Town Clerk
and shall be located in the town office.
D. Changes to the Official Shoreland Zoning Map.
If amendments, in accordance with Section 8, are made in the district boundaries or other
matter portrayed on the Official Shoreland Zoning Map, such changes shall be made on the
Official Shoreland Zoning Map within thirty (30) days after the amendment has been approved
by the Commissioner of the Department of Environmental Protection.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 5 of 48
10. Interpretation of District Boundaries.
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are property
lines, the centerlines of streets, roads and rights of way, and the boundaries of the shoreland area as
defined herein. Where uncertainty exists as to the exact location of district boundary lines, the
Board of Appeals shall be the final authority as to location.
11. Land Use Requirements.
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
12. Nonconformance.
NOTE: Refer to Section 17 for definitions of nonconforming condition, nonconforming lot,
nonconforming structure and nonconforming use.
A. Purpose.
It is the intent of this Ordinance to promote land use conformities, except that nonconforming
conditions that existed before the effective date of this ordinance or amendments thereto shall
be allowed to continue, subject to the requirements set forth in Section 12. Except as otherwise
provided in this Ordinance, a nonconforming condition shall not be permitted to become more
nonconforming.
B. General.
(1) Transfer of Ownership. Nonconforming structures, lots, and uses may be transferred, and
the new owner may continue the nonconforming use or continue to use the nonconforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of nonconforming uses and structures including repairs or renovations that do
not involve expansion of the nonconforming use or structure, and such other changes in a
nonconforming use or structure as federal, state, or local building and safety codes may
require.
C. Nonconforming Structures.
(1) Expansions.
All new structures must meet the shoreline setback requirements contained in Section
15(B). A nonconforming structure may be added to or expanded after obtaining a permit
from the same permitting authority as that for a new structure, if such addition or
expansion does not increase the nonconformity of the structure and is in accordance with
the subsections of Section 12(C)(1).
(a) Expansion of an accessory structure that is located closer to the normal high--water line
of a water body, tributary stream or upland edge of a wetland than the principal
structure is prohibited, even if the expansion will not increase nonconformity with the
water body, tributary stream or wetland setback requirement.
(b) Expansion of any portion of a structure within 25 feet of the normal high--water line of a
water body, tributary stream or upland edge of a wetland is prohibited, even if the
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 6 of 48
expansion will not increase nonconformity with the water body, tributary stream or
wetland setback requirement.
(c) Notwithstanding Section 12(C)(1)(b), if a nonconforming principal structure is entirely
located less than 25 feet from the normal high--water line of a water body, tributary
stream or upland edge of a wetland, that structure may be expanded as follows, as long
as all other applicable standards of this Ordinance are met and the expansion is not
prohibited by Section 12(C)(1) above:
(i) The maximum total footprint of the principal structure may not be expanded to an
area greater than 800 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater.
(ii) The maximum height of the principal structure may not be made greater than 15
feet or the height of the existing structure, whichever is greater.
(d) All other nonconforming principal and accessory structures that do not meet the water
body, tributary stream or wetland setback requirements may be expanded or altered as
follows, as long as other applicable standards of this Ordinance are met and the
expansion is not prohibited by Section 12(C)(1) and subsections (a), (b) or (c) above:
(i) For structures located less than 75 feet from the normal high--water line of a water
body, tributary stream or upland edge of a wetland, the maximum combined total
footprint of all structures may not be expanded to an area greater than 1,000
square feet or 30% larger than the footprint that existed on January 1, 1989,
whichever is greater.
(ii) For structures located less than 75 feet from the normal high--water line of a water
body, tributary stream or upland edge of a wetland, the maximum height of any
structure may not be made greater than 20 feet or the height of the existing
structure, whichever is greater.
(iii) For structures located less than 100 feet from the normal high--water line of a great
pond or a river flowing to a great pond, the maximum combined total footprint of all
structures may not be expanded to an area greater than 1,500 square feet or 30%
larger than the footprint that existed on January 1, 1989, whichever is greater.
(iv) For structures located less than 100 feet from the normal high--water line of a great
pond or a river flowing to a great pond, the maximum height of any structure may
not be made greater than 25 feet or the height of the existing structure, whichever
is greater.
(v) For structures located less than 100 feet from the normal high--water line of a great
pond or a river flowing to a great pond, any portion of those structures located less
than 75 feet from the normal high--water line of a water body, tributary stream or
upland edge of a wetland must meet the footprint and height requirements of
Sections 12(C)(1)(d)(i) and (ii).
(e) In addition to the limitations in Section 12(C)(1) and subsections (a), (b) and (c) above,
structures that are nonconforming due to their location within the Resource Protection
District and are located at less than 250 feet from the normal high--water line of a water
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 7 of 48
body or the upland edge of a wetland may be expanded or altered as follows, as long as
other applicable standards of this Ordinance are met:
(a) The maximum combined total footprint of all structures may not be expanded to an
area greater than 1,500 square feet or 30% larger than the footprint that existed at
the time the Resource Protection District was established on the lot, whichever is
greater.
(b) The maximum height of any structure may not be made greater than 25 feet or the
height of the existing structure, whichever is greater.
(c) Any portion of the structures located less than 100 feet from the normal high--water
line of a great pond or a river flowing to a great pond, must meet the footprint and
height requirements of Sections 12(C)(1)(d)(iii) and (iv).
(d) Any portion of the structures located less than 75 feet from the normal high--water
line of a water body, tributary stream or upland edge of a wetland must meet the
footprint and height requirements of Sections 12(C)(1)(d)(i) and (ii).
(f) Any approved plan for expansion of a nonconforming structure under Section 12(C)(1)
must be recorded by the applicant in the registry of deeds of the county in which the
property is located within 90 days of approval. The recorded plan must include the
existing and proposed footprint of structures on the property, the existing and proposed
height of structures on the property, the shoreland zone boundary and evidence of
approval by the municipal permitting authority.
(2) Foundations.
Whenever a new, expanded or replacement foundation is constructed under a
nonconforming structure, the structure and new foundation must be placed such that the
shoreline setback requirement is met to the greatest practical extent as determined by the
Planning Board or its designee, basing its decision on the criteria specified in Section
12(C)(3) below.
(3) Relocation.
A nonconforming structure may be relocated within the boundaries of the parcel on which
the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board or its
designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more nonconforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on--site soils suitable for
septic systems, and the type and amount of vegetation to be removed to accomplish the
relocation.
When it is necessary to remove vegetation within the water or wetland setback area in
order to relocate a structure, the Planning Board shall require replanting of native
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 8 of 48
vegetation to compensate for the destroyed vegetation. In addition, the area from which
the relocated structure was removed must be replanted with vegetation. Replanting shall be
required as follows:
Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted, no
one species of tree shall make up more than 50% of the number of trees planted. Replaced
trees must be planted no further from the water or wetland than the trees that were
removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed
in order to relocate a structure must be re--established. An area at least the same size as the
area where vegetation and/or ground cover was disturbed, damaged, or removed must be
reestablished within the setback area. The vegetation and/or ground cover must consist of
similar native vegetation and/or ground cover that was disturbed, destroyed or removed.
Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees, or a
combination thereof.
The Planning Board may also require replanting in accordance with Section 15(Q).
(4) Reconstruction or Replacement.
Any nonconforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed, or damaged or destroyed,
regardless of the cause, by more than 50% of the market value of the structure before such
damage, destruction or removal, may be reconstructed or replaced provided that a permit is
obtained within eighteen (18) months of the date of said damage, destruction, or removal,
and provided that such reconstruction or replacement is in compliance with the water body,
tributary stream or wetland setback requirement to the greatest practical extent as
determined by the Planning Board or its designee in accordance Section 12(C)(3) above. In
no case shall a structure be reconstructed or replaced so as to increase its nonconformity.
If the reconstructed or replacement structure is less than the required setback it shall not be
any larger than the original structure, except as allowed pursuant to Section 12(C)(1) above,
as determined by the nonconforming footprint of the reconstructed or replaced structure at
its new location. If the total amount of footprint of the original structure can be relocated or
reconstructed beyond the required setback area, no portion of the relocated or
reconstructed structure shall be replaced or constructed at less than the setback
requirement for a new structure.
When it is necessary to remove vegetation in order to replace or reconstruct a structure,
vegetation shall be replanted in accordance with Section 12(C)(3) above.
Any nonconforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market value,
or damaged or destroyed by 50% or less of the market value of the structure, excluding
normal maintenance and repair, may be reconstructed in place if a permit is obtained from
the Code Enforcement Officer within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to
the greatest practical extent the Planning Board or its designee shall consider, in addition to
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 9 of 48
the criteria in Section 12(C)(3) above, the physical condition and type of foundation present,
if any.
(5) Change of Use of a Nonconforming Structure.
The use of a nonconforming structure may not be changed to another use unless the
Planning Board, after receiving a written application, determines that the new use will have
no greater adverse impact on the water body, tributary stream, or wetland, or on the
subject or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and commercial fishing and maritime
activities, and other functionally water--dependent uses.
D. Nonconforming Uses.
(1) Expansions.
Expansions of nonconforming uses are prohibited, except that nonconforming residential
uses may, after obtaining a permit from the Planning Board, be expanded within existing
residential structures or within expansions of such structures as allowed in Section 12(C)(1)
above.
(2) Resumption Prohibited.
A lot, building or structure in or on which a nonconforming use is discontinued for a period
exceeding one year, or which is superseded by a conforming use, may not again be devoted
to a nonconforming use except that the Planning Board may, for good cause shown by the
applicant, grant up to a one year extension to that time period. This provision shall not apply
to the resumption of a use of a residential structure provided that the structure has been
used or maintained for residential purposes during the preceding five (5) year period.
(3) Change of Use.
An existing nonconforming use may be changed to another nonconforming use provided
that the proposed use has no greater adverse impact on the subject and adjacent properties
and resources, including water dependent uses, than the former use, as determined by the
Planning Board. The determination of no greater adverse impact shall be made according to
criteria listed in Section 12(C)(5) above.
E. Nonconforming Lots.
(1) Nonconforming Lots: A nonconforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and
shore frontage can be met. Variances relating to setback or other requirements not
involving lot area, lot width or shore frontage shall be obtained by action of the Board of
Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 10 of 48
exists on each lot, the nonconforming lots may be conveyed separately or together,
provided that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807--A through 4807--
D) and the State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above
referenced law and rules are complied with. When such lots are divided each lot thus
created must be as conforming as possible to the dimensional requirements of this
Ordinance.
(3) Contiguous Lots -- Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain
no principal structure the lots shall be combined to the extent necessary to meet the
dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is
nonconforming, owned by the same person or persons on December 6, 1991, and recorded
in the registry of deeds if the lot can accommodate a subsurface sewage disposal system in
conformance with the State of Maine Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of
lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts.
A. Resource Protection District.
The Resource Protection District includes areas in which development would adversely affect
water quality, productive habitat, biological ecosystems, or scenic and natural values. This
district shall include the following areas when they occur within the limits of the shoreland zone,
exclusive of the Stream Protection District, except that areas which are currently developed and
areas which meet the criteria for the Limited Commercial District need not be included within
the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands and
wetlands associated with great ponds and rivers, which are rated "moderate" or "high"
value waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic
Information System (GIS) data layer maintained by either MDIF&W or the Department as of
December 31, 2008. For the purposes of this paragraph "wetlands associated with great
ponds and rivers" shall mean areas characterized by non--forested wetland vegetation and
hydric soils that are contiguous with a great pond or river, and have a surface elevation at or
below the water level of the great pond or river during the period of normal high water.
"Wetlands associated with great ponds or rivers" are considered to be part of that great
pond or river.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 11 of 48
(2) Floodplains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the 100 year floodplain as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially
connected to a water body during the period of normal high water.
NOTE: These areas usually consist of forested wetlands abutting water bodies and non--forested
wetlands.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or river bed
movement.
B. Limited Commercial District.
The Limited Commercial District includes areas of mixed, light commercial and residential uses,
exclusive of the Stream Protection District. This district includes areas of two or more
contiguous acres in size devoted to a mix of residential and low intensity business and
commercial uses. Industrial uses are prohibited. Public and institutional uses compatible with
light commercial and residential uses may be allowed in this district.
C. Stream Protection District.
The Stream Protection District includes all land areas within seventy--five (75) feet, horizontal
distance, of the normal high--water line of a stream, exclusive of those areas within two--hundred
and fifty (250) feet, horizontal distance, of the normal high--water line of a great pond, or river,
or within two hundred and fifty (250) feet, horizontal distance, of the upland edge of a
freshwater wetland. Where a stream and its associated shoreland area are located within two--
hundred and fifty (250) feet, horizontal distance, of the above water bodies or wetlands, that
land area shall be regulated under the terms of the shoreland district associated with that water
body or wetland.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 12 of 48
14. Table of Land Uses.
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform with
all of the applicable land use standards in Section 15. The district designation for a particular site
shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes --
Allowed (no permit required but the use must comply with all applicable land use
standards)
No --
Prohibited
PB --
Allowed with permit issued by the Planning Board
CEO --
Allowed with permit issued by the Code Enforcement Officer
LPI --
Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -- Resource Protection
LC -- Limited Commercial
SP -- Stream Protection
NOTE: Terms are defined in Section 17, including but not limited to: functionally water--dependent
uses.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 13 of 48
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
LC
1.
Non--intensive recreational uses not requiring structures such as hunting, fishing and hiking
yes
yes
yes
2.
Motorized vehicular traffic on existing roads and trails
yes
yes
yes
3.
Clearing or removal of vegetation for activities other than timber harvesting
CEO
CEO1
yes
4.
Fire prevention activities
yes
yes
yes
5.
Wildlife management practices
yes
yes
yes
6.
Soil and water conservation practices
yes
yes
yes
7.
Mineral exploration
no
yes2
yes2
8.
Mineral extraction including sand and gravel extraction
no
PB3
PB
9.
Surveying and resource analysis
yes
yes
yes
10.
Emergency operations
yes
yes
yes
11.
Agriculture
yes
PB
yes
12.
Aquaculture
PB
PB
yes
13.
Principal structures and uses
A.
One and two family residential, including driveways
PB4
PB8
CEO
B.
Multi--unit residential
no
no
PB
C.
Commercial
No9
No9
PB
D.
Industrial
no
no
no
E.
Governmental and institutional
no
no
PB
F.
Small non--residential facilities for educational, scientific, or nature interpretation
purposes
PB4
PB
CEO
14.
Structures accessory to allowed uses
PB4
PB
CEO
15.
Conversions of seasonal residences to year--round residences
LPI
LPI
LPI
16.
Home occupations
PB
PB
CEO
17.
Private sewage disposal systems for allowed uses
LPI
LPI
LPI
18.
Essential services
A.
Roadside distribution lines (34.5kV and lower)
CEO5
CEO5
yes10
B.
Non--roadside or cross--country distribution lines involving ten poles or less in the
shoreland zone
PB5
PB5
CEO
C.
Non--roadside or cross--country distribution lines involving eleven or more poles in the
shoreland zone
PB5
PB5
PB
D.
Other essential services
PB5
PB5
PB
19.
Service drops, as defined, to allowed uses
yes
yes
yes
20.
Public and private recreational areas involving minimal structural development
PB
PB
PB
21. Special use lots of less than minimum lot requirements
11
PB
PB
PB
22.
Individual private campsites
CEO
CEO
CEO
23.
Campgrounds
no
No6
PB
24.
Road construction
PB
No7
PB
25.
Parking facilities
no
No6
PB
26.
Marinas
PB
no
PB
27.
Filling and earth moving of <10 cubic yards
CEO
CEO
yes
28.
Filling and earth moving of >10 cubic yards
PB
PB
CEO
29.
Signs
yes
yes
yes
30.
Uses similar to allowed uses
CEO
CEO
CEO
31.
Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
32.
Uses similar to uses requiring a PB permit
PB
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high--water line of great ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5See further restrictions in Section 15(K).
6Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
7Except as provided in Section 15(L).
8Single family residential structures may be allowed by special exception only according to the provisions of Section 16(F), Special Exceptions. Two--family
residential structures are prohibited.
9Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
10Permit not required
, but must file a written "notice of intent to construct" with CEO.
11 Requires permanent deed restriction to prohibit future development on lot.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to 38 M.R.S.A.
section 480--C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great pond, river, stream or brook and operates in
such a manner that material or soil may be washed into them:
A. Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B. Draining or otherwise dewatering;
C. Filling, including adding sand or other material to a sand dune; or
D. Any construction or alteration of any permanent structure.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 14 of 48
15. Land Use Standards.
All land use activities within the shoreland zone shall conform with the following provisions, if
applicable. New lots must also meet Lot Permit requirements of the Thorndike Land Use Ordinance.
A. Minimum Lot Standards
(1) Area and Shore Frontage Requirements by Use:
(a) Residential Per Dwelling Unit:
Minimum
Minimum
Lot Area
Shore Frontage
(Square Feet)
(Linear Feet)
(i)
Village District
43,560
200
(ii)
Rural District
87,124
200
(b) Governmental, Institutional, Commercial
or Industrial per Principal Structure
(i)
Village District
60,000
300
(ii)
Rural District
87,124
300
(c) Public or Private Recreational Facilities
(i)
Village District
43,560
200
(ii)
Rural District
87,124
200
(2) Special use lots such as substations, small parks or other uses in the public interest may be
allowed if all other standards in this and other applicable ordinances are met. Such lots and
uses shall be approved by the Planning Board and shall require a permanent deed restriction
to prevent future development inconsistent with permit standards.
(3) Land below the normal high--water line of a water body or upland edge of a wetland and
land beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
(4) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(5) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high--water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(6) If more than one residential dwelling unit, principal governmental, institutional, commercial or
industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
structure, or use, except that buildings may be clustered in an appropriate manner to allow for
more efficient operations and natural resource protection. Clustered design plans must meet
minimum averaged lot requirements within the Shoreland Zone portion of any lot and be
approved by the Planning Board.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 15 of 48
B. Principal and Accessory Structures.
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high--water line of great ponds and rivers that flow to
great ponds, and seventy--five (75) feet, horizontal distance, from the normal high--water line
of other water bodies, tributary streams, or the upland edge of a wetland. In the Resource
Protection District the setback requirement shall be 250 feet, horizontal distance, except for
structures, roads, parking spaces or other regulated objects specifically allowed in that
district in which case the setback requirements specified above shall apply.
NOTE: The Natural Resources Protection Act, 38 M.S.R.A. sections 480--A through 480--HH, requires
the Department of Environmental Protection to designate areas of "significant wildlife
habitat".
Permitting under the Natural Resources Protection Act for activities adjacent to significant
wildlife habitat areas may require greater setbacks. Contact your local Department of
Environmental Protection office to see if additional permitting is required.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water--
dependent uses.
(b) On a nonconforming lot of record on which only a residential structure exists, and it is
not possible to place an accessory structure meeting the required water body, tributary
stream or wetland setbacks, the code enforcement officer may issue a permit to place a
single accessory structure, with no utilities, for the storage of yard tools and similar
equipment. Such accessory structure shall not exceed eighty (80) square feet in area nor
eight (8) feet in height, and shall be located as far from the shoreline or tributary stream
as practical and shall meet all other applicable standards, including non--vegetated
surfaces and vegetation clearing limitations. In no case shall the structure be located
closer to the shoreline or tributary stream than the principal structure.
NOTE: Refer to Section 17 for definition of tributary stream.
(2) Principal or accessory structures and expansions of existing structures which are permitted
in the Resource Protection, Limited Commercial and Stream Protection Districts, shall not
exceed thirty--five (35) feet in height.
(a) This provision shall not apply to structures such as transmission towers, windmills,
antennas, and similar structures having no floor area.
(b) The height of a structure shall exclude a nonhabitable feature mounted on a structure
roof for observation purposes, such as a cupola, a dome or a widow's walk, provided the
following conditions are met:
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 16 of 48
(i) the feature is being added to, or is part of, a conforming structure,
(ii) the structure is not located in a Resource Protection or Stream Protection District,
(iii) the feature does not extend beyond the exterior walls of the structure,
(iv) the feature has a floor area of fifty--three (53) square feet or less, and
(v) the feature does not increase the height the structure, as defined, more than seven
(7) feet.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of
record, or in the absence of these, the flood as defined by soil types identified as recent
floodplain soils. Accessory structures may be placed in accordance with the standards of the
Floodplain Management Ordinance effective July 5, 2016 and amendments thereto.
(4) Non--vegetated surfaces shall not exceed twenty (20) percent of the portion of the lot
located within the shoreland zone. Non--vegetated surfaces include, but are not limited to
the following: structures, driveways, parking areas, and other areas from which vegetation
has been removed. Naturally occurring ledge and rock outcroppings are not counted as non--
vegetated surfaces for lots that were recorded on March 24, 1990, and that have been in
continuous existence since that date.
Section 15(B)(4) shall not apply to public boat launching facilities, regardless of the district in
which the facility is located.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high--water line
of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d)
The total height of the wall(s), in the aggregate, is no more than 24 inches;
(e) Retaining walls are located outside of the 100--year floodplain on rivers, streams, and
tributary streams, as designated on the Federal Emergency Management Agency's
(FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of
record, or in the absence of these, by soil types identified as recent floodplain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 17 of 48
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high--water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i)
The buffer must include shrubs and other woody and herbaceous
vegetation. Where natural ground cover is lacking the area must be
supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and
provide for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required,
measured perpendicularly to the normal high--water line or upland edge of
a wetland;
(v) A footpath not to exceed the standards in Section 15(N)(2)(a), may traverse
the buffer.
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal distance, of a
water body, tributary stream or coastal wetland, a permit pursuant to the Natural
Resource Protection Act is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access in
areas of steep slopes or unstable soils provided: that the structure is limited to a maximum
of four (4) feet in width; that the structure does not extend below or over the normal high--
water line of a water body or upland edge of a wetland, (unless permitted by the
Department of Environmental Protection pursuant to the Natural Resources Protection Act,
38 M.R.S.A. section 480--C); and that the applicant demonstrates that no reasonable access
alternative exists on the property.
(7) Notwithstanding the requirements in Section 15(B)(1) above, the permitting authority may
approve a deck over a river if it is part of a downtown revitalization project that is defined in
a project plan approved by the legislative body of the municipality, which may include the
revitalization of structures formally used as mills that do not meet the setback
requirements, provided that the following requirements are met:
(a) The total deck area attached to the structure does not exceed seven hundred (700)
square feet;
(b) The deck is cantilevered over a segment of the river that is located within the
boundaries of the downtown revitalization project;
(c) The deck is attached to or accessory to an allowed commercial use in a structure that
was constructed prior to 1971 and is located within the downtown revitalization project;
and
(d) The construction of the deck complies with all other applicable standards, except the
setback requirements in Section 15(B)(1).
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 18 of 48
NOTE: New permanent structures, and expansions thereof, projecting into or over water bodies
shall require a permit from the Department of Environmental Protection pursuant to the
Natural Resources Protection Act, 38 M.R.S.A. section 480--C. Permits may also be required
from the Army Corps of Engineers if located in navigable waters.
(8)
The Planning Board may approve shoreline stabilization of an eroding shoreline, provided
that the following requirements are met:
(a) Construction equipment must access the shoreline by barge when feasible, as
determined by the Planning Board.
(b) When necessary, the removal of vegetation to allow for construction equipment
access to the stabilization site via land must be limited to no more than twelve (12)
feet in width. When the shoreline stabilization is complete, the construction
equipment access way must be restored.
(b) Any restoration or revegetation shall occur in accordance with Section 15(Q).
NOTE: A permit pursuant to the Natural Resources Protection Act is required from the Department
of Environmental Protection for shoreline stabilization activities.
C. Campgrounds.
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high--water line of a water body shall not be included in calculating land
area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal
distance, from the normal high--water line of a great pond or a river flowing to a great pond,
and seventy--five (75) feet, horizontal distance, from the normal high--water line of other
water bodies, tributary streams, or the upland edge of a wetland.
D. Individual Private Campsites.
Individual private campsites not associated with campgrounds are allowed provided the
following conditions are met:
(1) On a vacant lot, one campsite per lot existing on the effective date of this Ordinance, or
thirty thousand (30,000) square feet of lot area within the shoreland zone, whichever is less,
may be permitted.
(2) On a lot that contains a principal use or structure, the lot shall contain the minimum lot
dimensional requirements for that principal use or structure separately from the thirty
thousand (30,000) square feet of lot area within the shoreland zone required per individual
private campsite.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 19 of 48
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal
high--water line of a great pond or river flowing to a great pond, and seventy--five (75) feet,
horizontal distance, from the normal high--water line of other water bodies, tributary
streams, or the upland edge of a wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in
a Resource Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off--site, written authorization from the receiving facility or land
owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on--site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with
the State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
E. Commercial and Industrial Uses.
The following new commercial and industrial uses are prohibited within the shoreland zone
adjacent to great ponds, and rivers and streams which flow to great ponds:
(1)
Auto washing facilities
(2)
Auto or other vehicle service and/or repair operations, including body shops
(3)
Chemical and bacteriological laboratories
(4)
Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms
(5)
Commercial painting, wood preserving, and furniture stripping
(6)
Dry cleaning establishments
(7)
Electronic circuit assembly
(8)
Laundromats, unless connected to a sanitary sewer
(9)
Metal plating, finishing, or polishing
(10)
Petroleum or petroleum product storage and/or sale except storage on same property
as use occurs and except for storage and sales associated with marinas
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 20 of 48
(11)
Photographic processing
(12)
Printing
F. Parking Areas.
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities shall be no less than fifty (50) feet,
horizontal distance, from the shoreline or tributary stream if the Planning Board finds that
no other reasonable alternative exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent stormwater runoff from flowing directly into a water body, tributary stream or
wetland and where feasible, to retain all runoff on--site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
G. Roads and Driveways.
In addition to the Entrance Permit requirements of the Thorndike Land Use Ordinance and those
of the Thorndike Road Ordinance, the following standards shall apply to the construction of
roads and/or driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one--hundred (100) feet, horizontal distance,
from the normal high--water line of a great pond or a river that flows to a great pond, and
seventy--five (75) feet, horizontal distance from the normal high--water line of other water
bodies, tributary streams, or the upland edge of a wetland unless no reasonable alternative
exists as determined by the Planning Board. If no other reasonable alternative exists, the
road and/or driveway setback requirement shall be no less than fifty (50) feet, horizontal
distance, upon clear showing by the applicant that appropriate techniques will be used to
prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective
use of additional ditch relief culverts and turnouts placed so as to avoid sedimentation of
the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline or
tributary stream due to an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures within the setback area
shall comply fully with the requirements of Section 15(G)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 21 of 48
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route
or location is available outside the district. When a road or driveway is permitted in a
Resource Protection District the road and/or driveway shall be set back as far as practicable
from the normal high--water line of a water body, tributary stream, or upland edge of a
wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(R).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
high--water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0--2
250
3--5
200--135
6--10
100--80
11--15
80--60
16--20
60--45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular
to the centerline of the road or driveway.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 22 of 48
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
H. Signs.
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. In the Limited Commercial District, however, such signs shall not exceed sixteen
(16) square feet in area. Signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non--flashing lights.
I.
Storm Water Runoff.
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420--D) requires a full permit to
be obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most--at--risk lake watershed, or a project with 1 acre or
more of developed area in any other stream, coastal or wetland watershed. A permit--
by--rule is necessary for a project with one acre or more of disturbed area but less than 1
acre impervious area (20,000 square feet for most--at--risk lakes and urban impaired
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 23 of 48
streams) and less than 5 acres of developed area. Furthermore, a Maine Construction
General Permit is required if the construction will result in one acre or more of
disturbed area.
J.
Septic Waste Disposal.
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following:
(a) clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy--five (75) feet, horizontal
distance, from the normal high--water line of a water body or the upland edge of a wetland;
and
(b) a holding tank is not allowed for a first--time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the
normal high--water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
K. Essential Services.
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road--side distribution lines, is not allowed in
a Resource Protection or Stream Protection District, except to provide services to a
permitted use within said district, or except where the applicant demonstrates that no
reasonable alternative exists. Where allowed, such structures and facilities shall be located
so as to minimize any adverse impacts on surrounding uses and resources, including visual
impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
L. Mineral Exploration and Extraction.
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from the
Code Enforcement Officer shall be required for mineral exploration which exceeds the above
limitation. All excavations, including test pits and holes, shall be immediately capped, filled or
secured by other equally effective measures to restore disturbed areas and to protect the public
health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (L)(4) below.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 24 of 48
(2) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet, horizontal distance, of the normal high--water line
of a great pond or a river flowing to a great pond, and within seventy--five (75) feet,
horizontal distance, of the normal high--water line of any other water body, tributary stream,
or the upland edge of a wetland. Extraction operations shall not be permitted within fifty
(50) feet, horizontal distance, of any property line without written permission of the owner
of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred
(100) cubic yards of materials are removed in any consecutive twelve (12) month period,
ground levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on--site. Only materials generated on--site may be buried or
covered on--site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid waste
management rules, Chapters 400--419 of the Department of Environmental Protection's
regulations may contain other applicable provisions regarding disposal of such materials.
(b) The final graded slope shall be two and one--half to one (2.5:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off--site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
M. Agriculture.
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the former Maine Department of Agriculture on November 1, 2001,
and the Nutrient Management Law (7 M.R.S.A. sections 4201--4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,
of a great pond or a river flowing to a great pond, or within seventy--five (75) feet horizontal
distance, of other water bodies, tributary streams, or wetlands. All manure storage areas
within the shoreland zone must be constructed or modified such that the facility produces
no discharge of effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Nonconformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and
Water Conservation District office.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 25 of 48
(4) There shall be no new tilling of soil within one--hundred (100) feet, horizontal distance, of
the normal high--water line of a great pond; within seventy--five (75) feet, horizontal
distance, from other water bodies; nor within twenty--five (25) feet, horizontal distance, of
tributary streams and freshwater wetlands. Operations in existence on the effective date of
this ordinance and not in conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high--water line of a great pond; within seventy--five
(75) feet, horizontal distance, of other water bodies; nor within twenty--five (25) feet,
horizontal distance, of tributary streams and freshwater wetlands. Livestock grazing
associated with ongoing farm activities, and which are not in conformance with the above
setback provisions may continue, provided that such grazing is conducted in accordance
with a Conservation Plan that has been filed with the Planning Board.
N. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting.
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the shoreline buffer extending 75 feet, horizontal distance, inland from
the normal high--water line, except to remove hazard trees in accordance with Section
15(Q).
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section 15(N)(1) above, within a shoreline buffer extending
one--hundred (100) feet, horizontal distance, inland from the normal high--water line of a
great pond or a river flowing to a great pond, or within a shoreline buffer extending seventy--
five (75) feet, horizontal distance, from any other water body, tributary stream, or the
upland edge of a wetland, vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from
the outer limits of the tree or shrub crown. However, a single footpath not to exceed six
(6) feet in width as measured between tree trunks and/or shrub stems is allowed for
accessing the shoreline provided that a cleared line of sight to the water through the
shoreline buffer is not created.
(b) Selective cutting of trees within the shoreline buffer is allowed provided that a well--
distributed stand of trees and other natural vegetation is maintained. For the purposes
of Section 15(N)(2)(b) a "well--distributed stand of trees" adjacent to a great pond, or a
river or stream flowing to a great pond, shall be defined as maintaining a rating score of
24 or more in each 25--foot by 50--foot rectangular (1250 square feet) area as
determined by the following rating system.
Diameter of Tree at 4--1/2 feet Above
Points
Ground Level (inches)
2 < 4 in.
1
4 < 8 in.
2
8 < 12 in.
4
12 in. or greater
8
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 26 of 48
Adjacent to other water bodies, tributary streams, and wetlands, a "well--distributed
stand of trees" is defined as maintaining a minimum rating score of 16 per 25--foot by
50--foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25--foot x 50--foot plot contains four (4)
trees between 2 and 4 inches in diameter, two trees between 4 and 8 inches in
diameter, three trees between 8 and 12 inches in diameter, and two trees over 12
inches in diameter, the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25--foot by 50--foot plot contains trees worth 36 points. Trees totaling 12
points (36-- 24 =12) may be removed from the plot provided that no cleared
openings are created.
The following shall govern in applying this point system:
(i) The 25--foot by 50--foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25--foot by 50--
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining
at least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½)
feet above ground level for each 25--foot by 50--foot rectangle area. If five saplings do
not exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three
(3) feet in height and other ground cover, including leaf litter and the forest duff layer,
shall not be cut, covered, or removed, except to provide for a footpath as described in
Section 15(N) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain the vegetation in the shoreline buffer, removal of storm--damaged,
hazard or dead trees and any required replanting shall occur in accordance with Section
15(Q).
(f) In order to maintain the vegetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 27 of 48
equipment operation, within or outside the shoreline buffer, must comply with the
requirements of Section 15(N)(2).
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond or
a river flowing to a great pond, and seventy--five (75) feet, horizontal distance, from the
normal high--water line of any other water body, tributary stream, or the upland edge of a
wetland, there shall be allowed on any lot, in any ten (10) year period, selective cutting of
not more than forty (40) percent of the volume of trees four (4) inches or more in diameter,
measured 4 1/2 feet above ground level. Tree removal in conjunction with the development
of permitted uses shall be included in the forty (40) percent calculation. For the purposes of
these standards volume may be considered to be equivalent to basal area.
(4) In no event shall cleared openings for any purpose, including but not limited to, principal
and accessory structures, driveways, lawns and sewage disposal areas, exceed in the
aggregate, 25% of the lot area within the shoreland zone or ten thousand (10,000) square
feet, whichever is greater, including land previously cleared. This provision applies to the
portion of the lot within the shoreland zone, including the shoreline buffer area. This
provision shall not apply to the General Development Districts.
(5) Legally existing nonconforming cleared openings may be maintained, in accordance with
Section 15(P). If these areas, fields or other cleared openings have reverted back to primarily
woody vegetation, as a result of not maintaining them in accordance with Section 15(P),
then the provisions of Section 15(N) shall apply.
O. Hazard Trees, Dead Trees and Storm--Damaged Trees.
(1) Hazard trees may be removed without a permit after consultation with the Code
Enforcement Officer, provided the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in
the tree canopy greater than two hundred and fifty (250) square feet, the opening shall
be replaced with native tree species, unless there is new tree growth already present
near to where the hazard tree was removed. New tree growth is considered to be at
least two (2) inches in diameter, measured at four and one half (4.5) feet above ground
level. If new growth is not present, then replacement trees shall consist of native
species, be at least four (4) feet in height and be no less than two (2) inches DBH.
Stumps shall not be removed.
(b) Outside the shoreline buffer, if the removal of hazard trees results in more than forty
(40) percent of the volume of trees, four (4) inches or more in diameter as measured at
four and one half (4.5) feet above ground level, being removed in any ten (10) year
period; or results in cleared openings of more than twenty--five (25) percent of the lot
area within the shoreland zone or more than ten thousand (10,000) square feet,
whichever is greater; then replacement with native tree species is required, unless there
is new tree growth already present near to where the hazard tree was removed. New
tree growth is considered to be at least two (2) inches DBH. If new growth is not
present, then replacement trees shall consist of native species and be no less than two
(2) inches DBH.
(c) The code enforcement officer may require the applicant to submit an evaluation from a
licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 28 of 48
(d) The code enforcement officer may require more than a one--for--one replacement for
removed hazard trees that exceeded eight (8) inches in diameter at four and one half
(4.5) feet above ground level.
(2) Dead trees may be removed without a permit, provided the following requirements are
met:
(a) The trees are dead from natural causes. Dead trees are those that contain no foliage
during the growing season.
(b) The removal of dead trees does not result in the creation of new lawn areas or other
permanently cleared areas.
(c) Stumps shall not be removed.
(3) Storm--damaged trees may be removed without a permit after consultation with the Code
Enforcement Officer, provided the following requirements are met:
(a) Within the shoreline buffer, if the removal of storm--damaged trees results in a cleared
opening in the tree canopy greater than two hundred and fifty (250) square feet, the
following shall be required:
(i) The area shall be required to naturally revegetate. If after one growing season, no
natural regeneration or regrowth is present, replanting of native tree seedlings or
saplings shall be required at a density of one seedling/sapling per every eighty (80)
square feet of open canopy.
(ii) The removal of storm--damaged trees does not result in the creation of new lawn
areas or other permanently cleared areas.
(iii) Stumps shall not be removed.
(iv) Limbs damaged from a storm event may be pruned even if they extend beyond the
bottom one--third (1/3) of the tree.
(b) Outside the shoreline buffer, if the removal of storm--damaged trees results in more
than forty (40) percent of the volume of trees, four (4) inches or more in diameter as
measured at four and one half (4.5) feet above ground level, being removed in any ten
(10) year period; or results in cleared openings of more than twenty--five (25) percent of
the lot area within the shoreland zone or more than ten thousand (10,000) square feet,
whichever is greater; then the area shall be required to naturally revegetate. If after one
growing season, no natural regeneration or regrowth is present, replanting of native
tree seedlings or saplings shall be required on a one--for--one basis.
P. Exemptions to Section 15(O).
The following activities are exempt from the standards for clearing or removal of vegetation set
forth in Section 15(P), provided that all other applicable requirements of this Ordinance are
complied with, and the removal of vegetation is limited to that which is necessary:
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 29 of 48
(1) The clearing or removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the standards of Section
15(P), such as but not limited to cleared openings in the canopy or fields. If any of these
areas revert back to primarily woody vegetation, due to a lack of removal of vegetation
every two (2) years, the requirements of Section 15(N) shall apply.
(2) The clearing or removal of vegetation from the location of allowed structures or allowed
uses, when the shoreline setback requirements of Section 15(B) are not applicable.
(3) The clearing or removal of vegetation from the location of public swimming areas associated
with allowed public recreational facilities.
(4) The clearing or removal of vegetation associated with allowed agricultural uses, provided
that all requirements of Section 15(M) are complied with, and that best management
practices are utilized.
(5) The clearing or removal of vegetation associated with brownfields or voluntary response
action program projects pursuant to 38 M.R.S.A section 343--E, provided that the following
provisions are met:
(a) The clearing or removal of vegetation is within the shoreland zone of rivers that do not
flow to great ponds that are designated as General Development Districts; and
(b) The clearing or removal of vegetation is necessary for remediation activities to clean up
contamination.
(6) The clearing or removal of non--native invasive vegetation, provided that the following
requirements are met:
(a) If clearing or removal of vegetation occurs via wheeled or tracked motorized equipment,
then the wheeled or tracked motorized equipment is operated and stored at least
twenty--five (25) feet, horizontal distance, from the shoreline, except that the wheeled
or tracked motorized equipment may be operated or stored on existing structural
surfaces, such as pavement or gravel;
(b) The clearing or removal of vegetation within twenty--five (25) feet, horizontal distance,
from the shoreline occurs via hand tools; and
(c) If the clearing or removal of non--native invasive vegetation results in a standard of
Section 15(N) being exceeded, then the area shall be revegetated in accordance with
Section 15(Q) to achieve compliance with the applicable standard(s) of Section 15(N).
NOTE: An updated list of non--native invasive vegetation is maintained by the Department of
Agriculture, Conservation and Forestry's Natural Areas Program.
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
(7) The clearing or removal of vegetation associated with emergency response activities
conducted by the Department, the U.S. Environmental Protection Agency, the U.S. Coast
Guard, and their agents.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 30 of 48
Q. Revegetation Requirements.
When revegetation is required to address the removal of non--native invasive species of
vegetation, to address removal of vegetation in conjunction with shoreline stabilization, in
response to violations of the standards set forth in Section 15(N), or as a mechanism to allow for
development that may otherwise not be permissible due to the standards of Section 15(N), then
revegetation shall comply with the following requirements:
(1) The applicant must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include
a scaled site plan, depicting where vegetation was, or is to be removed, where existing
vegetation is to remain, and where vegetation is to be planted, including a list of all
vegetation to be planted.
(2) Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed, and must occur at a density comparable to the pre--existing
vegetation. If this is not feasible due to shoreline stabilization, then revegetation must occur
along the same segment of shoreline and as close as possible to the area where vegetation
was removed.
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If
the activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must consist of saplings at a minimum;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different
species shall be used;
(d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for shoreline stabilization, and it is not possible to plant trees
and saplings in the same area where trees or saplings were removed, then trees or
saplings must be planted in a location that effectively reestablishes the screening
between the shoreline and structures; and
(f) A survival rate of at least eighty (80) percent of planted trees/saplings is required for a
minimum of five (5) years.
(5) Revegetation activities must meet the following requirements for all woody vegetation and
for other vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced
with native noninvasive species of woody vegetation and vegetation under three (3)
feet in height as applicable;
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 31 of 48
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantities and variety sufficient to prevent erosion and provide for effective infiltration
of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3)
different species shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody vegetation
plants; and
(e) Survival of planted woody vegetation and vegetation under three feet in height must be
sufficient to remain in compliance with the standards contained in Section 15(P) for a
minimum of five (5) years.
(6) Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and
provide for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, the area must be
supplemented with leaf mulch and/or bark mulch at a minimum of four (4) inches deep
to prevent erosion and provide for effective infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to
remain in compliance with the standards contained within this Ordinance for a
minimum of five (5) years.
R. Erosion and Sedimentation Control.
(1) All activities which involve filling, grading, excavation or other similar activities which result
in unstabilized soil conditions and which require a permit shall also require a written soil
erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or riprap.
(2) In order to create the least potential for erosion, development shall be designed to fit with
the topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance, and shall be in operation during all stages of the activity.
The amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 32 of 48
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of
the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five
hundred (500) square feet and shall be maintained until a catch of vegetation is
established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man--made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainage ways shall be designed and constructed in order
to carry water from a twenty five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
(6) When an excavation contractor will perform these activities, compliance with the following
shall be required:
(a) A person certified in erosion control practices by the Maine Department of
Environmental Protection shall be responsible for management of erosion and
sedimentation control practices at the site. This person shall be present at the site each
day these activities occur for a duration that is sufficient to ensure that proper erosion
and sedimentation control practices are followed. This is required until installation of
erosion and sedimentation control measures that will either stay in place permanently
or stay in place until the area is sufficiently covered with vegetation necessary to
prevent soil erosion.
(b) Include on the required plan or permit application, the name and certification number
of the person who will oversee activities causing or resulting in soil disturbance.
S. Soils.
All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on--
site investigation and be prepared by state--certified professionals. Certified persons may include
Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and
evaluation of soil properties. The report shall be based upon the analysis of the characteristics of
the soil and surrounding land and water areas, maximum ground water elevation, presence of
ledge, drainage conditions, and other pertinent data which the evaluator deems appropriate.
The soils report shall include recommendations for a proposed use to counteract soil limitations
where they exist.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 33 of 48
T. Water Quality.
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
U. Archaeological Site.
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as
determined by the permitting authority, shall be submitted by the applicant to the Maine
Historic Preservation Commission for review and comment, at least twenty (20) days prior to
action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
NOTE: Municipal officials should contact the Maine Historic Preservation Commission for the listing
and location of Historic Places in their community.
16. Administration.
A. Administering Bodies and Agents.
The Code Enforcement Officer (CEO), Planning Board (PB) and Board of Appeals, as established
in Town ordinance, shall administer those portions of this Ordinance so assigned. The Licensed
Plumbing Inspector (LPI) and Town Clerk shall perform duties as assigned within this Ordinance
in accordance with State statute and rules. The Road Commissioner may be engaged to confer
with the CEO on Driveway and Road provisions, particularly as requirements overlap with those
in other Town ordinances.
B. Fees Authorized.
The Board of Selectmen may adopt reasonable application fees to offset costs involved. Such
fees will be published in the town office.
C. Permits Required.
After the effective date of this Ordinance no person shall, without first obtaining a permit,
engage in any activity or use of land or structure requiring a permit in the district in which such
activity or use would occur; or expand, change, or replace an existing use or structure; or renew
a discontinued nonconforming use. A person who is issued a permit pursuant to this Ordinance
shall have a copy of the permit on site while the work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water,
and the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 34 of 48
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
D. Permit Application.
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, together with any required fees, to the appropriate
official as indicated in Section 14 or to the town office.
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that
the information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer, Town Clerk or Planning
Board, as appropriate, shall note upon each application the date and time of its receipt.
(5) If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
(6) When an excavation contractor will perform an activity that requires or results in more than
one (1) cubic yard of soil disturbance, the person responsible for management of erosion
control practices at the site must be certified by the Maine Department of Environmental
Protection. This person must be present at the site each day earthmoving activity occurs for
a duration that is sufficient to ensure that proper eroson and sedimentation practices are
followed. This is required until erosion and sedimentation control measures have been
installed, which will either stay in place permanently or stay in place until the area is
sufficiently covered with vegetation necessary to prevent soil erosion. The name and
certification number of the person who will oversee the activity causing or resulting in soil
disturbance shall be included on the permit application. This requirement does not apply to
a person or firm engaged in agriculture or timber harvesting if best management practices
for erosion and sedimentation control are used; and municipal, state and federal employees
engaged in projects associated with that employment.
E. Procedure for Administering Permits.
Within 35 days of the date of receiving a written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 14, shall notify the applicant in writing either
that the application is a complete application, or, if the application is incomplete, that
specified additional material is needed to make the application complete. The Planning
Board or the Code Enforcement Officer, as appropriate, shall approve, approve with
conditions, or deny all permit applications in writing within 35 days of receiving a completed
application. However, if the Planning Board has a waiting list of applications, a decision on
the application shall occur within 35 days after the first available date on the Planning
Board's agenda following receipt of the completed application, or within 35 days of the
public hearing, if the proposed use or structure is found to be in conformance with the
purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 35 of 48
After the submission of a complete application to the Planning Board, the Board shall
approve an application or approve it with conditions if it makes a positive finding based on
the information presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive
plan;
(7) Will not adversely affect existing commercial fishing or maritime activities;
(8) Will avoid problems associated with floodplain development and use; and
(9) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions
shall be stated in writing. No approval shall be granted for an application involving a
structure if the structure would be located in an unapproved subdivision or would violate
any other local ordinance, or regulation or statute administered by the municipality.
F. Special Exceptions.
In addition to the criteria specified in Section 16(E) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential structure
in a Resource Protection District provided that the applicant demonstrates that all of the
following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and
recorded in the registry of deeds of the county in which the lot is located before the
adoption of the Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100--year floodplain along rivers and artificially
formed great ponds along rivers, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements, are
elevated at least one foot above the 100--year floodplain elevation; and the
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 36 of 48
development is otherwise in compliance with any applicable municipal floodplain
ordinance. If the floodway is not shown on the Federal Emergency Management Agency
Maps, it is deemed to be 1/2 the width of the 100--year floodplain.
(4) The total footprint, as defined, is limited to a maximum of 1,500 square feet. This limitation
shall not be altered by variance.
(5) All structures, except functionally water--dependent structures, are set back from the normal
high--water line of a water body, tributary stream or upland edge of a wetland to the
greatest practical extent, but not less than 75 feet, horizontal distance. In determining the
greatest practical extent, the Planning Board shall consider the depth of the lot, the slope of
the land, the potential for soil erosion, the type and amount of vegetation to be removed,
the proposed building site's elevation in regard to the floodplain, and its proximity to
moderate--value and high--value wetlands.
G. Expiration of Permit.
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made within
one year of the issuance of the permit, the applicant shall have one additional year to complete
the project, at which time the permit shall expire.
H. Installation of Public Utility Service.
A public utility, water district, sanitary district or any utility company of any kind may not install
services to any new structure located in the shoreland zone unless written authorization
attesting to the validity and currency of all local permits required under this or any previous
Ordinance has been issued by the appropriate municipal officials or other written arrangements
have been made between the municipal officials and the utility.
I.
Appeals.
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application under this
Ordinance. Any order, requirement, decision or determination made, or failure to act, in
the enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in
this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of non--vegetated surfaces, and setback
requirements.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 37 of 48
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the nonconformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or a prior
owner.
(d) Notwithstanding Section 16(I)(2)(c)(ii) above, in accordance with 30--A M.R.S.A section
4353--A, the Code Enforcement Officer may approve a permit to the owner of a residential
dwelling unit for the purpose of making that dwelling accessible to a person with a
disability who resides in or regularly uses that dwelling. The permit is deemed to include
the variance, which shall be solely for installation of equipment or the construction of
structures necessary for access to or egress from the dwelling by the person with the
disability. The Code Enforcement Officer may impose conditions on the permit, including
limiting the permit to the duration of the disability or to the time that the person with the
disability lives in the dwelling. The term "structures necessary for access to or egress from
the dwelling" shall include ramps and associated railing, and wall or roof systems
necessary for the safety or effectiveness of the structure. Such permitting is subject to
Sections 16(I)(2)(f) and 16(I)(4)(b)(iv) below.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals.
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 38 of 48
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board
of Appeals shall hear and decide the matter afresh, undertaking its own independent analysis
of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the
decision was contrary to specific provisions of the Ordinance or contrary to the facts
presented to the Planning Board. The Board of Appeals may only review the record of the
proceedings before the Planning Board. The Board Appeals shall not receive or consider any
evidence which was not presented to the Planning Board, but the Board of Appeals may
receive and consider written or oral arguments. If the Board of Appeals determines that the
record of the Planning Board proceedings is inadequate, the Board of Appeals may remand
the matter to the Planning Board for additional fact finding.
(4) Appeal Procedure.
(a) Making an Appeal:
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement--related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the
appeal or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty--five (35) days of its receipt of a complete written
application, unless this time period is extended by the parties.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 39 of 48
(b) Decision by Board of Appeals:
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within
thirty five (35) days after the close of the hearing, and shall issue a written
decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand--delivered to the
applicant and to the Department of Environmental Protection within seven (7)
days of the Board's decision. Copies of written decisions of the Board of Appeals
shall be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
(5) Appeal to Superior Court
Except as provided by 30--A M.R.S.A. section 2691(3)(F), any aggrieved party who participated
as a party during the proceedings before the Board of Appeals may take an appeal to Superior
Court in accordance with State laws within forty--five (45) days from the date of any decision of
the Board of Appeals.
(6) Reconsideration
In accordance with 30--A M.R.S.A. section 2691(3)(F), the Board of Appeals may reconsider any
decision within forty--five (45) days of its prior decision. A request to the Board to reconsider a
decision must be filed within ten (10) days of the decision that is being reconsidered. A vote to
reconsider and the action taken on that reconsideration must occur and be completed within
forty--five (45) days of the date of the vote on the original decision. Reconsideration of a
decision shall require a positive vote of the majority of the Board members originally voting on
the decision, and proper notification to the landowner, petitioner, planning board, code
enforcement officer, and other parties of interest, including abutters and those who testified
at the original hearing(s). The Board may conduct additional hearings and receive additional
evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 40 of 48
J.
Enforcement.
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer.
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this
Ordinance is being violated, he or she shall notify in writing the person responsible for
such violation, indicating the nature of the violation and ordering the action necessary
to correct it, including discontinuance of illegal use of land, buildings or structures, or
work being done, removal of illegal buildings or structures, and abatement of nuisance
conditions. A copy of such notices shall be submitted to the municipal officers and be
maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on--site inspections to ensure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted
or denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings,
either legal or equitable, including seeking injunctions of violations and the imposition of
fines, that may be appropriate or necessary to enforce the provisions of this Ordinance in the
name of the municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements shall
not allow an illegal structure or use to continue unless there is clear and convincing evidence
that the illegal structure or use was constructed or conducted as a direct result of erroneous
advice given by an authorized municipal official and there is no evidence that the owner acted
in bad faith, or unless the removal of the structure or use will result in a threat or hazard to
public health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30--A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation for
each day that the violation continues. However, in a resource protection district the
maximum penalty is increased to $5000 (38 M.R.S.A. section 4452).
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 41 of 48
17. Definitions.
Accessory structure or use -- a use or structure which is incidental and subordinate to the principal use
or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A
deck or similar extension of the principal structure or a garage attached to the principal structure by a
roof or a common wall is considered part of the principal structure.
Aggrieved party -- an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a
permit or variance has been granted; or any other person or group of persons who have suffered
particularized injury as a result of the granting or denial of such permit or variance.
Agriculture -- the production, keeping or maintenance for sale or lease, of plants or animals, including
but not limited to: forages and sod crops, grains and seed crops, dairy animals and dairy products,
poultry and poultry products, livestock, fruits and vegetables, and ornamental green--house products.
Agriculture does not include forest management and timber harvesting activities.
Aquaculture -- the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area -- the area of cross--section of a tree stem at 4 1/2 feet above ground level and inclusive of
bark.
Basement -- any portion of a structure with a floor--to--ceiling height of 6 feet or more and having more
than 50% of its volume below the existing ground level.
Boat Launching Facility -- a facility designed primarily for the launching and landing of watercraft, and
which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation and Forestry, Bureau
of Forestry.
Campground -- any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use -- the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling
of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Development - a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements -- numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability -- any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a substantial
handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 42 of 48
psychologist, as well as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Driveway -- a vehicular access--way less than five hundred (500) feet in length serving two single--
family dwellings or one two--family dwelling, or less.
Emergency operations -- operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
Essential services -- gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles
and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines,
collection or supply systems; and associated storage tanks. Such systems may include towers, poles,
wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals,
hydrants and similar accessories, but shall not include service drops or buildings which are necessary
for the furnishing of such services.
Excavation contractor -- an individual or firm that either is engaged in a business that causes the
disturbance of one or more cubic yards of soil, or is in a business in which the disturbance of one or
more cubic yards of soil results from an activity that the individual or firm is retained to perform.
Disturbance includes: grading, filling, and removal. A person or firm engaged in agriculture or timber
harvesting activities is not considered an excavation contractor as long as best management
practices for erosion and sedimentation control are used. Municipal, state and federal employees
engaged in projects associated with that employment are not considered excavation contractors.
Expansion of a structure -- an increase in the footprint of a structure, including all extensions such
as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use -- the addition of one or more months to a use's operating season; or the use of
more footprint or ground area devoted to a particular use.
Family -- one or more persons occupying a premises and living as a single housekeeping unit.
Floodway -- the channel of a river or other watercourse and adjacent land areas that must be
reserved in order to discharge the 100--year flood without cumulatively increasing the water surface
elevation by more than one foot in height.
Floor area -- the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint -- the entire area of ground covered by the structure(s) on a lot, including but not limited
to: cantilevered or similar overhanging extensions, as well as unenclosed structures such as patios
and decks.
Forested wetland -- a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation -- the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frostwalls, or other base consisting of concrete,
block, brick or similar material.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 43 of 48
Freshwater wetland -- freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state,
the combined surface area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence
of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform
to the criteria of this definition.
Functionally water--dependent uses -- those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, waters and that can not be located
away from these waters. The uses include, but are not limited to commercial and recreational
fishing and boating facilities, finfish and shellfish processing, fish--related storage and retail and
wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat building
facilities, marinas, navigation aids, basins and channels, shoreline structures necessary for erosion
control purposes, industrial uses dependent upon water--borne transportation or requiring large
volumes of cooling or processing water that can not reasonably be located or operated at an inland
site, and uses that primarily provide general public access to waters. Recreational boat storage
buildings are not considered to be a functional water--dependent use.
Great pond -- any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner,
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree -- a tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a high
probability of failure and loss of a major structural component of the tree in a manner that will
strike a target. A normal range of environmental conditions does not include meteorological
anomalies, such as, but not limited to: hurricanes, hurricane--force winds, tornados, microbursts, or
significant ice storm events. Hazard trees also include those trees that pose a serious and imminent
risk to bank stability. A target is the area where personal injury or property damage could occur if
the tree or a portion of the tree fails. Targets include roads, driveways, parking areas, structures,
campsites, and any other developed area where people frequently gather and linger.
Height of a structure -- the vertical distance between the mean original (prior to construction) grade
at the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances that have no floor area.
Home occupation -- an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no more
than two (2) persons other than family members residing in the home.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 44 of 48
Increase in nonconformity of a structure -- any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in non--
vegetated surfaces, or increase in height of a structure. Property changes or structure expansions
which either meet the dimensional standard or which cause no further increase in the linear extent
of nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing nonconforming structure. Hence, a structure may be expanded
laterally provided that the expansion extends no closer to the water body, tributary stream, or
wetland than the closest portion of the existing structure from that water body, tributary stream, or
wetland. Included in this allowance are expansions which in--fill irregularly shaped structures.
Individual private campsite -- an area of land which is not associated with a campground, but which
is developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial -- The assembling, fabrication, finishing, manufacturing, packaging or processing of goods,
or the extraction of minerals.
Institutional - a non--profit or quasi--public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Lot area -- The area of land enclosed within the boundary lines of a lot, minus land below the normal
high--water line of a water body or upland edge of a wetland and areas beneath roads serving more
than two lots.
Marina -- a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value -- the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration -- hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction -- any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction
site.
Minimum lot width -- the closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi--unit residential -- a residential structure containing three (3) or more residential dwelling units.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 45 of 48
Native - indigenous to the local forests.
Nonconforming condition - nonconforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Nonconforming lot -- a single lot of record which, at the effective date of adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located.
Nonconforming structure -- a structure which does not meet any one or more of the following
dimensional requirements; setback, height, non--vegetated surfaces or footprint, but which is
allowed solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect.
Nonconforming use -- use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect.
Non--native invasive species of vegetation -- species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to
Maine ecosystems.
Normal high--water line -- that line which is apparent from visible markings, changes in the character
of soils due to prolonged action of the water or changes in vegetation, and which distinguishes
between predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers
and great ponds that support non--forested wetland vegetation and hydric soils and that are at the
same or lower elevation as the water level of the river or great pond during the period of normal
high--water are considered part of the river or great pond.
Person -- an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Principal structure -- a structure other than one which is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use -- a use other than one which is wholly incidental or accessory to another use on the
same lot.
Public facility -- any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity.
Recent floodplain soils -- the following soil series as described and identified by the National
Cooperative Soil Survey:
Alluvial
Charles
Cornish
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Podunk
Ondawa
Rumney
Saco
Recreational facility -- a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching facilities.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 46 of 48
Recreational vehicle -- a vehicle or an attachment to a vehicle designed to be towed, and designed
for temporary sleeping or living quarters for one or more persons, and which may include a pick--up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Residential dwelling unit -- a room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time--period rented. Recreational
vehicles are not residential dwelling units.
Riprap -- rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
River -- a free--flowing body of water including its associated floodplain wetlands from that point at
which it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road -- a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a
driveway as defined.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above ground
level.
Service drop -- any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right--of--way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground is less
than one thousand (1,000) feet in length.
Setback -- the nearest horizontal distance from the normal high--water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space
or other regulated object or area.
Shore frontage -- the length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 47 of 48
Shoreland zone -- the land area located within two hundred and fifty (250) feet, horizontal distance,
of the normal high--water line of any great pond or river; within 250 feet of the upland edge of a
freshwater wetland; or within seventy--five (75) feet, horizontal distance, of the normal high--water
line of a stream.
Shoreline - the normal high--water line, or upland edge of a freshwater wetland.
Significant River Segments -- See 38 M.R.S.A. section 437.
Storm--damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or
remains standing, and is damaged beyond the point of recovery as a result of a storm event.
Stream -- a free--flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent, highest resolution version of the national
hydrography dataset available from the United States Geological Survey, on the website of the
United States Geological Survey or the national map, to the point where the stream becomes a river
or where the stream meets the shoreland zone of another water body or wetland. When a stream
meets the shoreland zone of a water body or wetland and a channel forms downstream of the
water body or wetland as an outlet, that channel is also a stream.
Structure -- whether temporary or permanent: anything located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind; anything built,
constructed or erected on or in the ground. The term structure includes decks, patios, and satellite
dishes. Structure does not include fences; poles; wiring, guy wires, guy anchors and other aerial
equipment normally associated with service drops; subsurface waste water disposal systems as
defined in Title 30--A, section 4201, subsection 5; geothermal heat exchange wells as defined in Title
32, section 4700--E, subsection 3--C; and wells or water wells as defined in Title 32, section 4700--E,
subsection 8.
Substantial start -- completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on
or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi--municipal
sewer or waste water treatment system.
Sustained slope -- a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Timber harvesting -- the cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of vegetation in the shoreland zone associated
with any other land use activity, and the cutting or removal of trees in the shoreland zone on a lot
that has less than two (2) acres within the shoreland zone, shall not be considered timber
harvesting. Such cutting or removal of vegetation shall be regulated pursuant to Section 15 (P),
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting.
Tree - a woody perennial plant that has a well--defined trunk(s) at least two (2) inches in diameter at
four and one half (4.5) feet above the ground, that has a more or less definite crown and that
reaches a height of at least ten (10) feet at maturity.
2017 Shoreland Zoning Ordinance (Enacted 3/18/17)
Page 48 of 48
Tributary stream - means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with other water bodies. "Tributary stream" does not include rills or gullies
forming because of accelerated erosion in disturbed soils where the natural vegetation cover has
been removed by human activity. This definition does not include the term "stream" as defined
elsewhere in this Ordinance, and only applies to that portion of the tributary stream located within
the shoreland zone of the receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland -- the boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland
vegetation, but such vegetation is dominated by woody stems that are six (6) meters (approximately
twenty (20) feet) tall or taller.
Vegetation -- all live trees, shrubs, and other plants including without limitation, trees both over and
under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure -- the volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body -- any great pond, river or stream.
Water crossing -- any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings.
Wetland -- a freshwater wetland.
Woody Vegetation -- live trees or woody, non--herbaceous shrubs.
_____________________________________________________________________________________
Attest: A true copy of the ordinance entitled "Thorndike 2017 Shoreland Zoning Ordinance" as enacted
by the voters on March 18. 2017.
Attest: A true copy of the ordinance entitled "Thorndike 2017 Shoreland Zoning Ordinance" as enacted
by the voters on March 18, 2017.