This is the exact embedded text of the captured official document.
Snapshot 6895c4ed1a05 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF TURNER
SUBDIVISION ORDINANCE
Amended March 17, 1990
Amended March 17, 1990
Amended March 9, 1991
Amended March 14, 1992
Amended June 20, 1992
Amended June 12, 1993
Amended June 11, 1994
Amended April 13, 1996
Amended July 21, 1997
Amended April 18, 1998
Amended April 10, 1999
Amended April 8, 2000
Amended April 7, 2001
Amended April 6, 2002
Amended April 5, 2003
Amended April 3, 2004
Amended April 9, 2005
Amended April 8, 2006
Amended April 5, 2008
Amended April 4, 2009
Amended April 10, 2010
Amended April 5, 2014
Amended May 19, 2018
Amended May 22, 2021
TABLE OF CONTENTS
ARTICLE I. PURPOSES .............................................................................................................. 1
ARTICLE II. AUTHORITY, ADMINISTRATION, EFFECTIVE DATE REPEAL OF
EXISTING ORDINANCE.............................................................................................................. 1
2.1 Authority ............................................................................................................................................ 1
2.2 Administration ................................................................................................................................... 1
2.3
Effective Date .............................................................................................................................. 1
2.4
Repeal of Existing Subdivision Ordinance .................................................................................. 1
2.5
Conflict with Other Ordinances ................................................................................................... 1
2.6
Validity and Severability ............................................................................................................. 1
ARTICLE III. DEFINITIONS ....................................................................................................... 2
ARTICLE IV. ADMINISTRATIVE PROCEDURE .................................................................... 5
4.1
Purpose ........................................................................................................................................ 5
4.2
Agenda ......................................................................................................................................... 5
4.3
Joint Meetings ............................................................................................................................. 5
ARTICLE V. PREAPPLICATION FOR MINOR AND MAJOR SUBDIVISIONS ................... 5
5.1
Submission .................................................................................................................................. 5
5.2
Ownership Interest ....................................................................................................................... 6
5.3
Proposed Road Name and Numbering System ............................................................................ 6
ARTICLE VI. MINOR SUBDIVISIONS ..................................................................................... 7
6.1
General ........................................................................................................................................ 7
6.2
Procedure ..................................................................................................................................... 7
6.3
Submissions ................................................................................................................................. 8
ARTICLE VII. PRELIMINARY PLAN FOR MAJOR SUBDIVISION ................................... 10
7.1
Procedure ................................................................................................................................... 10
7.2
Submissions ............................................................................................................................... 12
ARTICLE VIII. FINAL PLAN FOR MAJOR SUBDIVISION .................................................. 15
8.1
Procedure ................................................................................................................................... 15
8.2
Submissions ............................................................................................................................... 16
8.3
Final Approval and Filing.......................................................................................................... 18
ARTICLE IX. ENFORCEMENT ................................................................................................ 18
9.1
Inspection of Required Improvements ...................................................................................... 18
9.2
Violations and Enforcement ...................................................................................................... 20
ARTICLE X. GENERAL STANDARDS ................................................................................... 21
10.1
Conformance with Comprehensive Plan ................................................................................... 21
10.2
Open Space Provisions .............................................................................................................. 21
10.3
Land Not Suitable for Development .......................................................................................... 22
10.4
Blocks ........................................................................................................................................ 22
10.5
Lots ............................................................................................................................................ 22
10.6
Utilities ...................................................................................................................................... 23
10.7
Required Improvements ............................................................................................................ 23
10.8
Land Features ............................................................................................................................ 25
10.9
Phosphorous Export ................................................................................................................... 25
10.10
Lake Protection Level ........................................................................................................... 26
10.11
Construction in Flood Hazard Areas ..................................................................................... 26
10.12
Mobile Home Parks ............................................................................................................... 27
10.13
Municipal Services ................................................................................................................ 27
10.14
Open Space Development ..................................................................................................... 27
10.15
Traffic Conditions ................................................................................................................. 27
10.16
Ground Water Quality ........................................................................................................... 29
10.17
Protection of Significant Wildlife Habitat ............................................................................ 30
10.18
Scenic Locations ................................................................................................................... 30
10.19
Archaeological Sites .............................................................................................................. 31
10.20
Solid Waste ........................................................................................................................... 31
10.21
Financial and Technical Capacity ......................................................................................... 31
ARTICLE XI. STREET AND STORM DRAINAGE DESIGN AND CONSTRUCTION
STANDARDS............................................................................................................................... 31
11.1
General Requirements ............................................................................................................... 31
11.2
Storm Water Management Design Standards ............................................................................ 32
11.3
Storm Drainage Construction Standards ................................................................................... 32
11.4
Certification of Construction ..................................................................................................... 33
ARTICLE XII. PERFORMANCE GUARANTEES ................................................................... 33
12.1
Types of Guarantees .................................................................................................................. 33
12.2
Contents of Guarantee ............................................................................................................... 34
12.3
Escrow Account ......................................................................................................................... 34
12.4
Performance Bond ..................................................................................................................... 34
12.5
Letter of Credit .......................................................................................................................... 34
12.6
Conditional Agreement.............................................................................................................. 34
12.7
Phasing of Development ............................................................................................................ 35
12.8
Release of Guarantee ................................................................................................................. 35
12.9
Default ....................................................................................................................................... 35
12.10
Privately-Owned Roads......................................................................................................... 35
12.11
Improvements Guaranteed .................................................................................................... 35
12.12
............................................................................................................................................... 35
ARTICLE XIII. WAIVERS ......................................................................................................... 35
13.1 Waiver requests ......................................................................................................................... 35
13.2
Where the Board makes written findings of fact ....................................................................... 35
13.3
When the Board grants a waiver ................................................................................................ 36
ARTICLE XIV. AMENDMENTS .............................................................................................. 36
14.1
Initiation of Amendments .......................................................................................................... 36
14.2 ......................................................................................................................................................... 36
14.3
Adoption of Amendment ........................................................................................................... 36
ARTICLE XV. APPEALS........................................................................................................... 36
15.1 ......................................................................................................................................................... 36
ARTICLE XVI. SUBDIVISION AMENDMENTS .................................................................... 36
16.1 Fees ...................................................................................................................................... 36
16.2 Revisions to approved plans ............................................................................................ 37
Town of Turner Subdivision Ordinance
Amended May 22, 2021
1
ARTICLE I. PURPOSES
The purposes of this Ordinance are to assure the comfort, convenience, safety, health and welfare of the
people of the Town of Turner, to protect the environment and to promote the development of an
economically sound and stable community. To this end, in approving subdivisions within the Town of
Turner, Maine, the Planning Board shall consider the following criteria and before granting approval shall
make findings of fact that the provisions of this Ordinance have been met and that the proposed
subdivision will meet the requirements established by State Subdivision Law.
ARTICLE II. AUTHORITY, ADMINISTRATION, EFFECTIVE DATE
REPEAL OF EXISTING ORDINANCE
2.1 Authority
A.
This Ordinance is adopted pursuant to Home Rule Powers as provided for in Article VIII-
A of the Maine Constitution and Title 30-A, M.R.S.A. Section 3001.
B.
These standards shall be known and may be cited as "Subdivision Ordinance of the Town
of Turner, Maine."
2.2 Administration
A.
The Planning Board of the Town of Turner, hereinafter called the Board, shall administer
these standards.
B.
The provisions of these standards shall pertain to all land proposed for subdivision, as
defined by this Ordinance within the Town of Turner.
2.3
Effective Date
The effective date of this Ordinance is July 8, 1988, which was the date of preparation of the
Final Draft. The ultimate enactment authority rests with a majority vote of a town meeting.
2.4
Repeal of Existing Subdivision Ordinance
Adoption of this Ordinance shall repeal any and all previous subdivision ordinances. This shall
not prevent the enforcement of repealed ordinances or regulations with respect to the time periods
in which they were in effect.
2.5
Conflict with Other Ordinances
A.
This Ordinance shall not be construed to repeal any existing bylaws or ordinances, other
than those specifically identified, or to impair the provisions of private restrictions placed
upon property, provided, however, that where this Ordinance imposes greater restrictions,
its provisions shall control.
2.6
Validity and Severability
A.
Should any section or provision of this Ordinance be declared by any court to be invalid,
such decision shall not invalidate any other section or provision.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
2
ARTICLE III. DEFINITIONS
In general, words and terms used in this Ordinance shall have their customary dictionary meanings. More
specifically, certain words and terms used herein are defined as follows:
Complete Application: An application shall be considered complete upon submission of the required fee
and all information required by this Ordinance, or by a vote by the Board to waive the submission of
required information. The Board shall issue a receipt to the applicant upon its determination that an
application is.
Creative Design Subdivision: A subdivision layout that considers the natural and cultural features of the
parcel to be developed and the intent of the Town of Turner Comprehensive Plan. Design elements may
include but not be limited to set aside of open space, conservation easements, building envelopes, and
setbacks.
Developed Area: Any area on which a site improvement or change is made, including buildings,
landscaping, parking areas, and streets.
Farmland: "Farmland" means a parcel consisting of 5 or more acres of land that is:
a.
Classified as prime farmland, unique farmland or farmland of statewide or local
importance by the Natural Resources Conservation Service within the United States
Department of Agriculture; or
b.
Used for the production of agricultural products as defined in Title 7, section 152,
subsection 2. ("Agricultural products" means those plants and animals and their products
that are useful to humans and includes, but is not limited to, forages and sod crops, grains
and feed crops, dairy and dairy products, poultry and poultry products, bees and bees'
products, livestock and livestock products and fruits, berries, vegetables, flowers, seeds,
grasses and other similar products, or any other plant, animal or plant or animal products
that supply humans with food, feed, fiber or fur. "Agricultural products" does not include
trees grown and harvested for forest products.)
Final Plan: The final drawings on which the applicant's plan of subdivision is presented to the Board for
approval and which, if approved, shall be recorded at the Registry of Deeds.
Fresh Water Wetland: Means fresh water swamps, marshes, bogs and similar areas which are:
a.
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils; and
b.
Not considered part of great pond, river, stream or brook.
These areas may contain small stream channels or inclusions of land that do not conform to the criteria.
High Intensity Soil Survey: A soil survey conducted by a Certified Soil Scientist, meeting the standards
of the National Cooperative Soil Survey, which identifies soil types down to 1/10 acre or less at a scale
equivalent to subdivision plan submitted. The mapping units shall be the soil series. Single soil test pits
and their evaluation shall not be considered to constitute high intensity soil surveys.
Infrastructure Improvements: Roads, drainage and stormwater systems, common water and sewer
systems whether public or private.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
3
Liquidation Harvesting: Has the same meaning as in Title 12, section 8868, subsection 6 and "parcel"
means a contiguous area within one municipality, township or plantation owned by one person or a group
of persons in common or joint ownership.
Low Impact Development. "Low impact development" or "green infrastructure" means site planning
and design strategies intended to replace or replicate predevelopment hydrology through the use of source
control and relatively small-scale measures integrated throughout a site to disconnect impervious surfaces
and enhance filtration, treatment, and management of stormwater runoff as close to its source as possible.
Low impact development strategies may be either nonstructural or structural, except that low impact
development strategies utilizing structural stormwater management techniques shall be limited to an
impervious contributing drainage area equal to or less than 1 acre. Low impact development strategies
include, but are not limited to: bioretention filters, grass swales and channels, vegetated filter strips,
permeable pavements, rain gardens and vegetated rooftops.
Manufactured Housing: Means a structural unit or units designated for occupancy and constructed in a
manufacturing facility and transported, by the use of its own chassis or an independent chassis, to a
building site. The term includes any type of building which is constructed at a manufacturing facility and
transported to a building site where it is used for housing and may be purchased or sold by a dealer in the
interim. For purposes of this section, two types of manufactured housing are included. Those two types
are:
1.
Those units constructed after June 15, 1976, commonly called "newer mobile homes,"
which the manufacturer certifies are constructed in compliance with the United States
Department of Housing and Urban Development standards, meaning structures
transportable in one or more sections, which in the traveling mode are 14 body feet or
more in width and are 750 or more sq.ft., and which are built on a permanent chassis and
designed to be used as dwellings, with or without permanent foundations, when
connected to the required utilities including the plumbing, heating, air conditioning or
electrical systems contained in the unit;
a.
This term also includes any structure which meets all the requirements of this
subparagraph, except the size requirements and with respect to which the
manufacturer voluntarily files a certification required by the Secretary of the
United States Department of Housing and Urban Development and complies with
the standards established under the National Manufactured Housing Construction
and Safety Standards Act of 1974, United States Code, Title 42, Section 5401,
et.seq.; and
2.
Those units commonly called "modular homes" which the manufacturer certifies are
constructed in compliance with Title 10, Chapter 957, and rules adopted under that
chapter, meaning structures, transportable in one or more sections, which are not
constructed on a permanent chassis and are designed to be used as dwellings on
foundations when connected to required utilities, including the plumbing, heating, air
conditioning or electrical systems contained in the unit.
Mobile Home Park: A parcel of land under unified ownership approved by the Town of Turner's
Planning Board pursuant to the Town of Turner's Subdivision Ordinance for the placement of three (3) or
more manufactured homes.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
4
Mobile Home Park Lot: Mobile home park lot means the area of land on which an individual home is
situated within a mobile home park and which is reserved for use by the occupants of that home. A
municipality shall require a lot to be designated on a mobile home park plan.
100 Year Flood: The flood having a one percent chance of being equaled or exceeded in any given year.
Open Space Development: A subdivision in which the lot sizes are reduced below those normally
required which in return for the provision of permanent open space owned in common by lot/unit owners,
the Town, or a land conservation organization.
Person: Includes a firm, association, organization, partnership, trust, company, or corporation, as well as
an individual.
Preliminary Subdivision Plan: The preliminary drawings indicating the proposed layout of the
subdivision to be submitted to the Board for its consideration.
Recording Plan: Recording Plan: A copy of the Final Plan which is recorded at the Registry of Deeds.
Resubdivision: The division of an existing subdivision or any change in the plan for an approved
subdivision which effects the lot lines, including land transactions by the subdivider not indicated on the
approved plan.
Solar Collector: A device, or combination of devices, structure, or part of a device or structure that
transforms direct solar energy into thermal, chemical, or electrical energy and that contributes to a
building's energy supply.
Solar Energy System: A complete design or assembly consisting of a solar energy collector, an energy
storage facility (when used), and components for the distribution of transformed energy.
Stream, River or Brook: River, stream or brook means a channel between defined banks. A channel is
created by the action of surface water and has two (2) or more of the following characteristics.
A.
It is depicted as a solid or broken blue line on the most recent edition of the U.S.
Geological Survey 7.5-minute series topography map or if that is not available, a 15-
minute series topography map.
B.
It contains or is known to contain flowing water continuously for a period of at least 3
months of the year in most years.
C.
The channel bed is primarily composed of material such as sand and gravel, parent
material or bedrock that has been deposited or scoured by water.
D.
The channel contains aquatic animals such as fish, aquatic insects or mollusks in the
water or, if no surface water is present in the stream bed.
E.
The channel bed contains aquatic vegetation and is essentially devoid of upland
vegetation.
River, stream or brook does not mean a ditch or other drainage way constructed and maintained solely for
the purpose of draining storm water or a grassy swale.
Subdivision: The division of a tract or parcel of land into three or more lots as defined by Title 30-A
M.R.S.A. Section 4401. In addition shall include developments where there are three or more units
involved such as mobile home parks, multiple family housing, apartment houses, multiple housing units,
and condominiums.
Subdivision, Major: Any subdivision containing more than four lots or dwelling units, or any
subdivision containing a proposed street.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
5
Subdivision, Minor: Any subdivision containing not more than four lots or dwelling units, and in which
no street is proposed to be constructed.
Substantial Construction: Completing of at least 30% of the required infrastructure improvements
measured as a percentage of total estimated cost of improvements.
Tract, or Parcel, of Land: All contiguous land in the same ownership, whether or not the land is
separated at any point by: an intermittent or non-navigable stream, provided that lands on the opposite
sides of a public or private road are considered each a separate tract or parcel of land unless the road was
established by the owner of land on both sides of the road after September 22, 19971.
ARTICLE IV. ADMINISTRATIVE PROCEDURE
4.1
Purpose. The purpose of this Article is to establish an orderly, equitable and expeditious
procedure for reviewing subdivisions.
4.2
Agenda. In order to avoid unnecessary delays in processing applications for subdivision review,
the Board shall prepare an agenda for each regularly scheduled meeting. Applicants shall request
to be placed on the Board's agenda at least twenty eight (28) days in advance of a regularly
scheduled meeting by contacting the Chair or the Planner. Applicants who attend a meeting but
who are not on the Board's agenda may be heard but only after all agenda items have been
completed, and then only if a majority of the Board so votes. Every application shall be
accompanied by the written certificate of the Town's Code Enforcement Officer that the applicant
is not in violation of any Town Ordinance regulating land use. No application shall be considered
complete, nor shall any application be in order for review or approval unless accompanied by this
written certificate. The Board shall not waive this requirement.
4.3
Joint Meetings. If any portion of the proposed subdivision crosses the boundary of an adjacent
municipality, the Planning Board shall meet jointly with that municipality's planning board to
discuss the application.
ARTICLE V. PREAPPLICATION FOR MINOR AND MAJOR SUBDIVISIONS
5.1
Submission.
A.
The Preapplication Sketch Plan shall show, in simple sketch form, the proposed layout of
streets, lots, and other features in relation to existing conditions. The Sketch Plan, which
may be a freehand pencilled sketch, should be supplemented with general information to
describe or outline the existing conditions of the site and the proposed development. It is
recommended that the sketch plan be superimposed on or accompanied by a copy of the
Assessor's Map(s) on which the land is located. The Sketch Plan shall be accompanied
by
1.
A copy of a portion of the U.S.G.S. topographic map of the area showing the outline
of the proposed subdivision, unless the proposed subdivision is less than ten acres in
size.
2.
A statement concerning timber harvesting resulting in any violation of the
Liquidation Harvesting Rule.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
6
B.
When the proposed subdivision will encompass twenty (20) or more acres and five or
more lots and is located in the Rural I or Rural II District as defined in the Town of
Turner Zoning Ordinance, the applicant shall submit sketch plans of both a traditional
subdivision layout and open space or creative design subdivision layout.
C.
The sketch plan for an open space or creative design subdivision will show how the
following applicable provisions will be incorporated in subdivision design.
1.
The policy of the Town of Turner to encourage use of prime agricultural land for
farming;
2.
The policy of the Town of Turner to use residential development techniques that
conserve land, significant natural areas and reduce construction costs;
3.
The policy of the Town of Turner that development that takes place in forested
areas to conserve forest lands and resource values;
4.
The policy of the Town of Turner to minimize impacts of development upon
recognized historic buildings and natural sites/areas;
5.
The policy of the Town of Turner to minimize the loss of the values of
significant scenic areas and sites from encroaching development;
6.
The parcel's unique features that may include but not be limited to agricultural
land, forest land, fields, ridges, stone walls, tree lines, streams, wetlands, wildlife
habitat, and scenic views and how such features will be conserved and integrated
into the subdivision design.
5.2
Ownership Interest. The developer will furnish written evidence showing his interest (option,
contract for sale, etc.) in the property to be subdivided to the Planning Board.
5.3
Proposed Road Name and Numbering System. The developer shall submit to the Board the
name proposed for any new public or privately owned road and a numbering system that
complies with Section 5 of the Turner Addressing Ordinance.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
7
ARTICLE VI. MINOR SUBDIVISIONS
6.1
General. In any case in which, because of the complexity of the subdivision proposal or
circumstances indicating that some aspect of the proposal is likely to present a substantial risk to
public health, safety, or welfare, the Planning Board may require the applicant to submit any of
the additional information which would be required for a major subdivision where necessary to
assure that a hazardous condition will not be present.
6.2
Procedure.
A.
Within six months after receipt of the sketch plan by the Board the sub divider shall
submit an application for approval of a Final Plan at least twenty-eight (28) days prior to
a scheduled meeting of the Board. Failure to do so shall require resubmission of the
Sketch Plan to the Board. The Final Plan shall approximate the layout shown on the
Sketch Plan, plus any recommendations made by the Board. The Board shall provide the
sub divider with a dated receipt of a Final Plan application at the Board Meeting where
the Final Plan application is first presented and heard by the Board. Every application
shall be accompanied by the written certificate of the Town's Code Enforcement Officer
that the applicant is not in violation of any Town Ordinance regulating land use. No
application shall be considered complete, nor shall any application be in order for review
or approval, unless accompanied by this written certificate.
B.
All applications for Final Plan approval for a minor Subdivision shall be accompanied by
an application fee of $100 per lot, dwelling unit, payable by check to the Town of Turner.
There shall be an additional payment of $150.00 for each lot or dwelling unit .This
portion of the application fee shall be known as the Planning Board Review Escrow
Account, a dedicated account. The monies shall be made by check payable to the Town
of Turner, Maine. These funds or portion thereof may, from time to time, be used by the
Planning Board, for purposes to be determined by the Planning Board in order to make
payments for reasonable costs, expenses and services incurred by or contracted for by the
Town through the Planning Board at its discretion which relates directly to the review of
the subdivision application. Such services may include, but need not be limited to,
consulting engineering fees, architectural fees, land uses planner fees and attorney fees.
All fees must relate to the review of the application pursuant to the review criteria of the
Town of Turner ordinances and the laws of the State of Maine. If the balance in the
applicant's portion of the Planning Board Review Escrow Account shall be drawn down
by 75%, the Board shall require that an additional $50.00 per lot or dwelling unit or unit
contained in a commercial or business complex be deposited by the applicant. The Board
shall continue to notify the applicant and require an additional $50.00 per lot or unit be
deposited as necessary whenever the balance of the account is drawn down to 75% of the
original deposit. The Town at the request of the Planning Board shall refund all the
remaining monies in the account upon the payment of all costs and services related to the
Planning Board review. Such payment of remaining monies shall be made no later than
30 days after the approval of the application, denial of application, or approval with
condition of application. Such refund shall be accompanied by final accounting of
expenditures from the fund. The monies in such fund shall not be used by the Planning
Board for any enforcement purposes.
C.
Upon receipt of an application for approval of a Minor Subdivision, the Planning Board
shall notify in writing all owners of abutting property to the proposed subdivision.
D.
The subdivider, or his duly authorized representative, shall attend the meeting of the
Board to discuss the Final Plan.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
8
E.
At the first meeting held, the Board shall notify the applicant whether or not the
application is complete, and what, if any, additional submissions are required for a
complete application.
F.
The Board shall hold a public hearing on each application at the first meeting the
application is presented, and shall publish notice of the date, time, and place of the
hearing in a newspaper of general circulation in the municipality at least two times, the
date of the first publication to be at least seven (7) days prior to the hearing. Notice of
the public hearing shall be mailed to all abutters of the proposed subdivision seven (7)
days prior to the hearing by the Town of Turner Planning Board.
G.
Within thirty days of receipt of a complete application, or within another time limit as
may be otherwise mutually agreed to by the Board and the sub divider, the Board shall
make findings of fact on the application, and approve, approve with conditions, or deny
the Final Plan. The Board shall specify in writing its findings of facts and reasons for any
conditions or denial.
6.3
Submissions.
Applications for a Minor Subdivision shall be submitted on the application forms provided by
the Town. Ten (10) copies of the completed application form, required plans, and related
information shall be submitted to the Chair or Planner no less than twenty-eight (28) days
prior to the regular scheduled meeting.
The subdivision plan for a Minor Subdivision shall consist of two reproducible, stable based
transparent originals, one to be recorded at the Registry of Deeds, the other to be filed at the
Municipal Office and three paper copies of one or more maps or drawings drawn to a legible
scale such that all necessary detail can easily be read. Plans shall be no larger than 24 by 36
inches in size, and shall have a margin of two inches outside of the border lines on the left
side for binding and a one inch margin outside the border along the remaining sides. Space
shall be provided for endorsement by the Board. The Applicant shall provide copies of the
application no less than twenty eight (28) days prior to the regular meeting.
The Planning Board shall make available at Town Hall documents for review by the Fire
Department, Rescue Chief, Road Commissioner, and Superintendent of Schools. The
Planning Board can request that the Fire Chief, Rescue Chief, The Road Commissioner and
Superintendent of Schools provide the Planning Board with official comments upon the
adequacy of their department's existing capacity to service the proposed development
.
The application for approval of a Minor Subdivision shall include the following information:
1.
Proposed name of the subdivision, or identifying title, and the name of the
municipality in which it is located, plus the Assessor's Map and Lot Numbers.
2.
A field survey of the boundary lines of the tract, giving complete descriptive data
by bearings and distances, made and certified by a professional land surveyor.
The corners of the tract shall be located on the ground and marked by
monuments. At least one corner of the parcel shall be identified with relation to
abutting property. The plan shall indicate the type of monument set or found at
each lot corner.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
9
3.
A copy of the deed from which the survey was based. A copy of all deed
restrictions, easements, rights-of-way, or other encumbrances currently affecting
the property.
4.
A copy of any deed restrictions intended to cover all or part of the lots in the
subdivision.
5.
Indication of the type of sewage disposal to be used in the subdivision.
a.
When sewage disposal is to be accomplished by subsurface wastewater
disposal systems, test pit analyses, prepared by a Licensed Site Evaluator
shall be provided. A map showing the location of all test pits dug on the
site shall be submitted.
6.
Indication of the type of water supply system(s) to be used in the subdivision.
Evidence of adequate ground water supply and quality shall be submitted by a
well driller or a hydro geologist familiar with the area.
7.
The date the Plan was prepared, north point, graphic map scale, names and
addresses of the record owner, subdivider, and individual or company who
prepared the plan, and the names of adjoining property owners. The plan(s) shall
be embossed with the seal by the professional engineer, surveyor or planner, or
all of the above, as the case may be.
8.
A copy of the portion of the county Soil Survey covering the subdivision.
9.
Contour lines at the interval specified by the Planning Board, showing elevations
in relation to Mean Sea Level.
10.
If any portion of the subdivision is in a flood-prone area, the 100-year flood
elevation shall be delineated on the plan. The final plan shall include a condition
of approval that principal structures will be constructed with their lowest floor,
including the basement, at least one foot above 100- year flood elevation.
11.
A soil erosion and sedimentation control plan.
12.
A plan to control surface drainage prepared by a Licensed Professional Engineer.
13.
The location of any fresh water wetlands.
14.
The location of river, stream or brook within or abutting the proposed
subdivision.
15.
The location and nature of significant wildlife identified by the Maine
Department of Inland Fisheries and Wildlife or the Town of Turner.
16.
Any portion of the subdivision which is located within the watershed of a lake or
pond shall be identified.
17.
A phosphorus impact analysis and control plan when determined as necessary by
the Board.
18.
The location of any zoning boundaries affecting the subdivision.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
10
19.
The location known of potential archaeological resources.
20.
Identification of known rare and endangered species and measures to protect
them.
21.
The location of documented historic buildings and sites on or adjacent to the site
and measures to minimize impacts of them.
22.
The location of scenic sites or views as identified in the Town of Turner
Comprehensive Plan.
23.
The estimated cost of infrastructure improvements and a statement of the
applicant's technical and financial capacity to carry out the project as proposed.
24.
A copy of the approved Driveway or Entrance permit issued by the Maine
Department of Transportation if a driveway or entrance will enter onto Route 4,
Route 117, Route 219, Center Bridge Road, Upper Street or Weston Road.
25.
A statement indicating if the applicant will install utilities above or below
ground.
26.
A map or plan of the subdivision identifying farmland.
ARTICLE VII. PRELIMINARY PLAN FOR MAJOR SUBDIVISION
7.1
Procedure.
Procedure. Preliminary Plan review is optional at the Applicant's request. Should the Applicant
elect to forego Preliminary Plan review, then the Final Plan review must include all of the
requirement submission information of the Preliminary Plan review along with the requirements
of the Final Plan review. A Public Hearing will be required.
A.
Within six months after receipt of the sketch plan by the Planning Board, the subdivider
shall submit an application for approval of a Preliminary Plan at least twenty-eight (28)
days prior to a regular scheduled meeting of the Planning Board. Failure to do so shall
require resubmission of the Sketch Plan to the Board. The Preliminary Plan shall
approximate the layout shown on the Sketch Plan, plus any recommendations made by
the Board. The Board shall provide the subdivider with a dated receipt of a Preliminary
Plan application at the Board meeting where the Preliminary Plan application is first
presented and heard by the Board. Every application shall be accompanied by the written
certificate of the Town's Code Enforcement Officer that the applicant is not in violation
of any Town Ordinance regulating land use. No application shall be considered
complete, nor shall any application be in order for review or approval, unless
accompanied by this written certificate.
B.
All applications for Preliminary Plan approval for a Major Subdivision shall be
accompanied by an application fee of $100.00 per lot, dwelling unit, or unit contained in
a shopping center or similar commercial establishment payable by check to the Town of
Turner. There shall be an additional payment of $150.00 for each lot or dwelling unit or
Town of Turner Subdivision Ordinance
Amended May 22, 2021
11
for each unit contained in a shopping center, mini mall, business complex or similar
commercial establishment. This portion of the application fee shall be known as the
Planning Board Review Escrow Account, a dedicated account. The initial payment into
the Planning Board Review Escrow Account shall in no case exceed $3,000.00. The
monies shall be made by check payable to the Town of Turner, Maine. These funds or
portion thereof may, from time to time, be used by the Planning Board, for purposes to be
determined by the Planning Board in order to make payments for reasonable costs,
expenses and services incurred by or contracted for by the Town through the Planning
Board at its discretion which relates directly to the review of the subdivision application.
Such services may include, but need not be limited to, consulting engineering fees,
architectural fees, land uses planner fees and attorney fees. All fees must relate to the
review of the application pursuant to the review criteria of the balance in the applicant's
portion of the Planning Board Review Escrow Account shall be drawn down by 75%, the
Board shall require that an addition $50.00 per lot or dwelling unit or unit contained in a
commercial or business complex be deposited by the applicant. The Board shall continue
to notify the applicant and require an additional $50.00 per lot or unit be deposited as
necessary whenever the balance of the account is drawn down to 75% of the original
deposit. The Town at the request of the Planning Board shall refund all the remaining
monies in the account upon the payment of all costs and services related to the Planning
Board review. Such payment of remaining monies shall be made no later than 30 days
after the approval of the application, denial of application, or approval with condition of
application. Such refund shall be accompanied by final accounting of expenditures from
the fund. The monies in such fund shall not be used by the Planning Board for any
enforcement purposes.
C.
The subdivider, or his duly authorized representative, shall attend the meeting of the
Board to discuss the Preliminary Plan.
D.
The Board shall hold a public hearing on the Preliminary Plan application at the first
meeting the application is presented and shall publish notice of the date, time and place of
the hearing in a newspaper of general circulation in the municipality at least two times,
the date of the first publication to be at least seven (7) days prior to the hearing. Notice
of the public hearing shall be mailed to all abutters of the proposed subdivision seven (7)
days prior to the hearing by the Town of Turner.
When a subdivision is located within 500 feet of a municipal boundary, the Planning
Board shall notify the Clerk and the Planning Board of the adjacent municipality
involved, at least ten days prior to the Public Hearing.
E.
At the first meeting held, the Board shall notify the applicant whether or not the
application is complete, and what, if any, additional submissions are required for a
complete application.
F.
Within sixty days of receipt of a complete application, or within another time limit as
may be otherwise mutually agreed to by the Board and the subdivider, the Board shall
make findings of fact on the application, and approve, approve with conditions, or deny
the Preliminary Plan. The Board shall specify in writing its findings of facts and reasons
for any conditions or denial.
G.
When granting approval to a Preliminary Plan, the Board shall state the conditions of
such approval, if any, with respect to:
1.
The specific changes which it will require in the Final Plan;
Town of Turner Subdivision Ordinance
Amended May 22, 2021
12
2.
The character and extent of the required improvements for which waivers may
have been requested and which in the Board's opinion may be waived without
jeopardy to the public health, safety, and general welfare; and
3.
The amount and type of all performance guarantees which it will require as
prerequisite to the approval of the Final Plan.
H.
Approval of a Preliminary Plan shall not constitute approval of the Final Plan or intent to
approve the Final Plan, but rather it shall be deemed an expression of approval of the
design of the Preliminary Plan as a guide to the preparation of the Final Plan. The Final
Plan shall be submitted for approval of the Board upon fulfillment of the requirements of
this Ordinance and the conditions of preliminary approval, if any. Prior to the approval
of the Final Plan, the Board may require additional changes or conditions the Board
deems necessary, as a result of the further study of a subdivision or as a result of
additional information received, so that the Final Plan satisfies all of the approval criteria
set forth in this Ordinance or in 30-A M.R.S.A. §4404 for subdivision approval.
7.2
Preliminary Plan Submissions.
A.
Applications for preliminary plan approval shall be submitted on the application forms
provided by the Town. Ten (10) copies of the completed application form, required plans,
and related information shall be submitted to the Planning Board no less than twenty-
eight (28) days prior to the regular scheduled meeting.
B.
The preliminary plan shall consist of one or more maps or drawings which may be
printed or reproduced on paper, with all dimensions shown in feet or decimals of a foot.
The Preliminary Plan shall be drawn to a legible scale such that all necessary detail can
easily be read. The Applicant shall provide copies of the application no less than twenty-
eight (28) days prior to the regular meeting. The Planning Board shall make available at
Town Hall documents for review by the Fire Department, Rescue Chief, Road
Commissioner, and Superintendent of Schools. The Planning Board can request that the
Fire Chief, Rescue Chief, The Road Commissioner and Superintendent of Schools
provide the Planning Board with official comments upon the adequacy of their
department's existing capacity to service the proposed development.
The following information shall either be shown on the Preliminary Plan or accompany
the application for preliminary approval:
1.
Location Map: The Preliminary Plan shall be accompanied by a Location Map
adequate to show the relationship of the proposed subdivision to the adjacent
properties, and to allow the Board to locate the subdivision within the
municipality. The Location Map shall show:
a.
Existing subdivisions in the proximity of the proposed subdivision.
b.
Locations and names of existing and proposed streets.
c.
Boundaries and designations of any zoning districts.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
13
d.
An outline of the proposed subdivision and any remaining portion of the
owner's property if the Preliminary Plan submitted covers only a portion
of the owner's entire contiguous holding.
2.
Proposed name of the subdivision and the name of the municipality in which it is
located, plus the Tax Assessor's Map and Lot Numbers.
3.
An actual field survey of the boundary lines of the tract, giving complete
descriptive data by bearings and distances, made and certified by a professional
land surveyor. The corners of the tract shall be located on the ground and marked
by monuments. The plan shall indicate the type of monument set or found at each
lot corner.
4.
A copy of the deed from which the survey was based. A copy of all covenants or
deed restrictions, easements, rights-of-way, or other encumbrances currently
affecting the property.
5.
A copy of any covenants or deed restrictions intended to cover all or part of the
lots in the subdivision.
6.
Contour lines at the interval specified by the Planning Board, showing elevations
in relation to Mean Sea Level.
7.
The number of acres within the proposed subdivision, location of property lines,
existing buildings, watercourses, vegetative cover type, and other essential
existing physical features shall be shown on the plan.
8.
Indication of the type of sewage disposal to be used in the subdivision.
a.
When sewage disposal is to be accomplished by subsurface sewage
disposal systems, test pit analyses, prepared by a Licensed Site Evaluator
shall be provided. A map showing the location of all test pits dug on the
site shall be submitted.
9.
Indication of the type of water supply system(s) to be used in the subdivision.
Evidence of adequate ground water supply and quality shall be submitted by a
well driller or a hydro geologist familiar with the area.
10.
The date the Plan was prepared, magnetic north point, graphic map scale, names
and addresses of the record owner, subdivider, and individual or company who
prepared the plan. The plan(s) shall be stamped or sealed by a licensed engineer,
surveyor or planner, or all of them, as the case may be.
11.
The names and addresses of owners of record of adjacent property, including any
property directly across an existing public street from the subdivision.
12.
The location of any zoning boundaries affecting the subdivision.
13.
The location and size of existing and proposed sewers, water mains, culverts, and
drainage ways on or adjacent to the property to be subdivided.
14.
The location, names and present widths of existing and proposed streets,
highways, easements, building lines, parks and other open spaces on or adjacent
to the subdivision.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
14
15.
The width and location of any streets or public improvements shown upon the
Comprehensive Plan, if any, within the subdivision.
16.
The proposed lot lines with approximate dimensions and lot areas.
17.
All parcels of land proposed to be dedicated to public use and the conditions of
such dedication.
18.
The location of any open space to be preserved and an indication of its
improvement and management.
19.
A soil erosion and sedimentation control plan.
20.
A plan to control surface drainage, prepared by a Licensed Professional Engineer.
21.
A copy of that portion of the county soil survey covering the subdivision. When
the medium intensity soil survey shows soils which are generally unsuitable for
the uses proposed, the Board may require the submittal of a report by a Registered
Soil Scientist indicating the suitability of soil conditions for those uses.
22.
If any portion of the subdivision is in a flood-prone area, the boundaries of any
flood hazard areas and the 100-year flood elevation shall be delineated on the
plan.
23.
The location of any fresh water wetlands.
24.
The location of river, stream or brook within or abutting the proposed subdivision.
25.
The location and nature of significant wildlife habitat identified by the Maine
Department of Inland Fisheries and Wildlife or the Town of Turner.
26.
Any portion of the subdivision which is located within the watershed of a lake or
pond shall be identified.
27.
A phosphorus impact analysis and control plan when determined as necessary by
the Board.
28.
The location known or potential archaeological resources.
29.
Identification of known rare and endangered species and measures to protect
them.
30.
The location of documented historic buildings and sites on or adjacent to the site
and measures to minimize impacts on them.
31.
The location of scenic sites or views as identified in the Town of Turner
Comprehensive Plan.
32.
The estimated cost of infrastructure improvements and a statement of the
applicant's technical and financial capacity to carry out the project as proposed.
33.
A Traffic Impact Analysis when required by the Board prepared by a Professional
Engineer.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
15
34.
A copy of the approved Driveway or Entrance permit issued by the Maine
Department of Transportation if a driveway or entrance will enter onto Route 4,
Route 117, Route 219, Center Bridge Road, Upper Street or Weston Road.
35.
A statement indicating if the applicant will install utilities above or below ground.
36.
The location of farmland.
ARTICLE VIII. FINAL PLAN FOR MAJOR SUBDIVISION
8.1
Procedure.
A.
The subdivider shall, within 12 months after the approval of the Preliminary Plan, file
with the Board an application for approval of the Final Plan. If the application for the
Final Plan is not submitted within 12 months after Preliminary Plan approval, the Board
may refuse without prejudice to act on the Final Plan, and require resubmission of the
Preliminary Plan. The Final Plan shall approximate the layout shown on the Preliminary
Plan, plus any recommendations made by the Board. The Board shall provide the
subdivider with a dated receipt of a Final Plan application at the Board meeting where the
Final Plan application is first presented and heard by the Board. Every application shall
be accompanied by the written certificate of the Town's Code Enforcement Officer that
the applicant is not in violation of any Town Ordinance regulating land use. No
application shall be considered complete, nor shall any application be in order for review
or approval, unless accompanied by this written certificate.
B.
The subdivider, or his duly authorized representative, shall attend the meeting of the
Board to discuss the Final Plan.
C.
At the first meeting held on a Final Plan, the Board shall notify the applicant whether or
not the application is complete, and what, if any, additional submissions are required for a
complete application and determine whether to hold a public hearing on the Final Plan
application.
D.
Prior to approval of the Final Plan application, the following approvals shall be obtained
in writing, where applicable.
1.
Maine Department of Environmental Protection, under the Site Location of
Development Act, Natural Resource Protection Act, Stormwater Management
Law, or if a Wastewater Discharge License is needed.
2.
Maine Department of Human Services, if the subdivider proposes to provide a
Community Water System as defined by the State of Maine Rules of the
Department of Human Services Relating to Drinking Water (10-144A. C.M.R.
231).
3.
Maine Department of Human Services, if a centralized or shared subsurface
sewage disposal system(s) is to be utilized.
4.
An approved Driveway or Entrance permit issued by the Maine Department of
Transportation if a driveway or entrance will enter onto Route 4, Route 117,
Route 219, Center Bridge Road, Upper Street or Weston Road.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
16
E.
A public hearing may be held by the Planning Board within thirty days after the issuance
of a receipt for the submittal of a complete application. This hearing shall be advertised
in a newspaper of local circulation at least two times, the date of the first publication to
be at least seven days before the hearing, and the notice of the hearing shall be posted in
at least three prominent places at least seven days prior to the hearing. Notice of public
hearing shall be mailed to all abutters of the proposed subdivision seven (7) days prior to
the hearing.
When a subdivision is located within 500 feet of a municipal boundary, and a public
hearing is to be held, the Planning Board shall notify the Clerk and the Planning Board of
the adjacent municipality involved, at least ten days prior to the hearing.
F.
Before the Board grants approval of the Final Plan, the subdivider shall meet the
performance guarantee requirements contained in Article XII.
G.
If the subdivision is located in more than one municipality, the Board shall have a joint
meeting with the Planning Board of the adjacent municipality to discuss the Plan.
H.
The Board, within thirty days from the public hearing or within sixty days of receiving a
complete application, if no hearing is held, shall make findings of fact, and conclusions
relative to the standards contained in Title 30-A M.R.S.A. §4404 and in this Ordinance.
If the Board finds that all standards of the Statute and this Ordinance have been met, they
shall approve the Final Plan. If the Board finds that any of the standards of the Statute
and this Ordinance have not been met, the Board shall either deny the application or
approve the application with conditions to ensure all of the standards will be met by the
subdivision. The reasons for any conditions shall be slated in the records of the Board.
8.2
Submissions.
The Final Plan shall consist of one or more maps or drawings drawn to a legible scale such that
all necessary detail can easily be read. Plans shall be no larger than 24 by 36 inches in size, and
shall have a margin of two inches outside of the border line on the left side for binding and a one
inch margin outside the border along the remaining sides. Space shall be reserved thereon for
endorsement by the Board. One reproducible, stable based transparent originals, embossed with
the seal of the professional who prepared the plan, to be filed at the Municipal Offices, and three
paper copies of the plan shall be submitted. The applicant shall have a subdivision plan filed and
recorded at the Registry of Deeds. The Applicant shall provide copies of the final plan no less
than twenty-eight (28) days prior the regular meeting. The Planning Board shall make available at
Town Hall documents for review by the Fire Department, Rescue Chief, Road Commissioner,
and Superintendent of Schools. The Planning Board can request that the Fire Chief, Rescue Chief,
The Road Commissioner and Superintendent of Schools provide the Planning Board with official
comments upon the adequacy of their department's existing capacity to service the proposed
development.
The application for approval of the Final Plan shall include the following information.
A.
Proposed name of the subdivision and the name of the municipality in which it is located,
plus the Assessor's Map and Lot Numbers.
B.
An actual field survey of the boundary lines of the tract, giving complete descriptive data
by bearings and distances, made and certified by a professional land surveyor. The
Town of Turner Subdivision Ordinance
Amended May 22, 2021
17
corners of the tract shall be located on the ground and marked by monuments. The plan
shall indicate the type of monument set or found at each lot corner.
C.
The number of acres within the proposed subdivision, location of property lines, existing
buildings, watercourses, and other essential existing physical features.
D.
Indication of the type of sewage disposal to be used in the subdivision.
E.
Indication of the type of water supply system(s) to be used in the subdivision.
F.
The date the Plan was prepared, magnetic and true north point, graphic map scale, names
and addresses of the record owner, subdivider, and individual or company who prepared
the plan.
G.
The location of any zoning boundaries effecting the subdivision.
H.
The location and size of existing and proposed sewers, water mains, culverts, and
drainage ways on or adjacent to the property to be subdivided.
I.
The location, names and present widths of existing and proposed streets, highways,
easements, building lines, parks and other open spaces on or adjacent to the sub
division. The plan shall contain sufficient data to allow the location, bearing and length
of every street line, lot line, and boundary line to be readily determined and be
reproduced upon the ground. These lines shall be tied to reference points previously
established. The length of all straight lines, the deflection angles radii, length of curves
and central angles of curves, tangent distances and tangent bearings for each street shall
be included. The final plan showing a proposed road shall indicate by lines or dots in the
center of the proposed road intervals of every fifty (50) feet beginning at the intersection
with the existing street.
J.
If not provided during Preliminary Plan review, the width and location of any streets or
public improvements shown upon the Comprehensive Plan, if any, within the
subdivision.
K.
All parcels of land proposed to be dedicated to public use and the conditions of such
dedication. Written offers of cession to the municipality of all public open spaces shown
on the plan, and copies of agreements or other documents showing the manner in which
open spaces to be retained by the developer or lot owners are to be maintained shall be
submitted. If open space or other land is to be offered to the municipality, written
evidence that the Municipal Officers are satisfied with the legal sufficiency of the written
offer of cession shall be included.
L.
If any portion of the subdivision is in a flood-prone area, the 100-year flood elevation
shall be delineated on the plan. The final plan shall include a condition of approval that
principal structures will be constructed with their lowest floor, including the basement, at
least one foot above 100- year flood elevation.
M.
The location of wetlands.
8.3
Final Approval and Filing
Town of Turner Subdivision Ordinance
Amended May 22, 2021
18
A.
No plan shall be approved by the Planning Board as long as the subdivider has
outstanding violations on any approved subdivision plan within the Town of Turner.
B.
Upon findings of fact and determination that all standards in Title 30-A, M.R.S.A. §4404,
and this Ordinance have been met, and upon voting to approve the subdivision, the Board
shall sign the Final Plan. The Board shall specify in writing its findings of facts and
reasons for any conditions or denial. One copy of the signed plan shall be retained by the
Board as part of its permanent records. One copy of the signed plan shall be forwarded to
the Tax Assessor. One copy of the signed plan shall be forwarded to the Code
Enforcement Officer. Any subdivision not recorded in the Registry of Deeds by the
subdivider within ninety days of the date upon which the plan is approved and signed by
the Board shall become null and void.
C.
At the time the Board grants Final Plan approval, it may permit the Plan to be divided
into two or more sections subject to any conditions the Board deems necessary in order to
insure the orderly development of the Plan.
D.
The approval by the Board of a subdivision plan shall not be deemed to constitute or be
evidence of any acceptance by the municipality of any street, easement, or other open
space shown on such plan. When a park, playground, or other recreation area shall have
been shown on the plan to be dedicated to the municipality, approval of the Plan shall not
constitute an acceptance by the municipality of such areas. The Board shall require the
Plan to contain appropriate notes to this effect. The Board may also require the filing of a
written agreement between the applicant and the Municipal Officers covering future deed
and title, dedication, and provision for the cost of grading, development, equipment, and
maintenance of any such dedicated area.
E.
Failure to commence substantial construction of the required infrastructure improvements
for the subdivision within two years of the date of approval and signing of the final Plan
shall render the Plan null and void. A statement of this effect must appear on any final
plan. Upon good cause shown, the Board may extend the approval for additional two
year periods. The extension request must be made to the Board at least thirty days prior
to the time of expiration. Upon determining that a subdivision's approval has expired
under this paragraph, the Board shall have a notice placed in the Registry of Deeds to that
effect.
ARTICLE IX. ENFORCEMENT
9.1
Inspection of Required Improvements
A.
At least five days prior to commencing each major phase of construction of required
infrastructure improvements, the sub divider or builder shall:
1.
Notify the Code Enforcement Officer in writing of the time when he proposes to
commence construction of such improvements, so that the Municipal Officers can
cause inspection to be made to assure that all municipal specifications and
requirements shall be met during the construction of required infrastructure
improvements, and to assure the satisfactory completion of improvements and
utilities required by the Board.
2.
Deposit with the municipal officers a check for the amount of 2% of the estimated
costs of construction and infrastructure improvements to pay for the costs of
inspection. If upon satisfactory completion of construction and cleanup there are
Town of Turner Subdivision Ordinance
Amended May 22, 2021
19
funds remaining, the surplus funds shall be refunded to the applicant within 30 days.
If the inspection account shall be drawn down by 90%, the applicant shall deposit an
additional 1% of the estimated costs of construction and infrastructure
improvements.
B.
If the inspecting official finds, upon inspection of the infrastructure improvements that
any of the required improvements have not been constructed in accordance with the plans
and specifications filed by the subdivider, he shall so report in writing to the Municipal
Officers, Planning Board, and the subdivider or builder. The Municipal Officers shall
take any steps necessary to preserve the municipality's rights.
C.
If at any time before or during the construction of the required infrastructure
improvements, it appears to be necessary or desirable to modify the required
improvements, the inspecting official is authorized to approve minor modifications due to
unforeseen circumstances such as encountering hidden outcrops of bedrock, natural
springs, etc. The inspecting official shall issue any approval under this section in writing
and shall transmit a copy of the approval to the Board. Revised plans shall be filed with
the Town. For major modifications, such as relocation of rights-of-way, property
boundaries, changes of grade by more than 1%, etc., the applicant shall submit to the
Planning Board an amended application for review and approval in accordance
with Section 6.2.
D.
At the close of each summer construction season, the Town shall, at the expense of the
subdivider, have the site inspected by a qualified individual. By December 1 of each year
during which construction was done on the site, the inspector shall submit a report to the
Board based on that inspection, addressing whether storm water and erosion control
measures (both temporary and permanent) are in place, are properly installed, and appear
adequate to do the job they were designed for. The report shall also include a discussion
and recommendations on any problems which were encountered.
E.
Prior to the sale of any lot, the sub divider shall provide the Board with a letter from a
Professional Land Surveyor, stating that all monumentation shown on the plan has been
installed.
F.
Upon completion of street construction and prior to a vote by the Municipal Officers to
submit a proposed town way to a town meeting, a written certification signed by a
licensed professional engineer registered in the State of Maine shall be required by the
Municipal Officers at the expense of the applicant, certifying that the proposed town way
meets or exceeds the design and construction requirements of the Town of Turner, Maine,
Street Construction Ordinance. "As built" plans shall be submitted to the Municipal
Officers.
G.
The subdivider or builder shall be required to maintain all infrastructure improvements
and provide for snow removal on streets and sidewalks and maintenance until acceptance
of the improvements by the municipality.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
20
9.2
Violations and Enforcement
A.
No plan of a division of land within the municipality which would constitute a
subdivision shall be recorded in the Registry of Deeds until a Final Plan has been
approved by the Board in accordance with Title 30-A, M.R.S.A. §4404 and this
Ordinance.
B.
No person, firm, corporation or other legal entity may convey, offer or agree to convey
any land in a subdivision which has not been approved by the Board and recorded in the
Registry of Deeds.
C.
No person, firm, corporation or other legal entity may convey, any land in an approved
subdivision which is not shown on the Final Plan as a separate lot.
D.
Any person, firm, corporation or other legal entity who conveys, offers or agrees to
convey any land in a subdivision which has not been approved as required by this
Ordinance shall be penalized in accordance with Title 30-A M.R.S.A., Section 4452.
Each day the violation exists shall be considered a separate violation. The Municipality
may institute proceedings to enjoin the violation of this section, and may collect
attorneys' fees and court costs if it is the prevailing party.
E.
No public utility or any utility company of any kind shall serve any lot in a subdivision
for which a Final Plan has not been approved by the Board.
F.
No person shall establish or develop a subdivision without first having a final plan
thereof approved by the Planning Board. "Develop" shall include grading or construction
of roads, grading of land or lots, or construction of any buildings.
G.
Once a preliminary plan for a subdivision approval has been received by the Planning
Board no lot or lots shall be sold or developed until the final plan has been approved an
recorded in the Registry of Deeds.
H.
Consent Agreements: The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and collecting fines without court action.
I.
Legal Actions: When the above action does not result in the complete correction or
abatement of the violation or nuisance condition, the Municipal Officers, upon notice
from the Code Enforcement Officer, are hereby directed to institute any and all actions
and proceedings, either legal or equitable, including seeking injunctions of violations and
the imposition of fines, that may be appropriate or necessary to enforce the provisions of
this Ordinance in the name of the municipality.
J.
Fines: Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who orders or conducts any activity in violation of this Ordinance shall be
penalized in accordance with Title 30-A M.R.S.A., Section 4452. Each day the violation
exists shall be considered a separate violation.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
21
ARTICLE X. GENERAL STANDARDS
In reviewing applications for a subdivision, the Board shall consider the following general standards and
make findings that each, in addition to standards contained in Title 30-A, M.R.S.A., Section 4404, have
been met prior to the approval of a Final Plan. In all instances, the burden of proof shall be upon the
applicant.
10.1
Conformance with Comprehensive Plan. All proposed subdivisions shall be in conformity
with the Comprehensive Plan of the municipality and with the provisions of all pertinent state and
local codes and ordinances.
10.2
Open Space Provisions
A.
The Board may require that a proposed subdivision design include a landscape plan that
will show the preservation of existing trees, the replacement of trees and vegetation,
graded contours, streams and the preservation of scenic, historic or environmentally
desirable areas.
B.
The Board may require that the subdivider reserve an area equal to ten percent of his total
land as an open space and/or recreational area for use by property owners in the
subdivision. The developer may instead make a payment in lieu of dedication into a
municipal land acquisition fund. A payment in lieu of dedication shall be calculated at
the market value of land at the time of the subdivision, as determined by the municipal
tax assessor, and deposited into a municipal land acquisition or improvement fund.
1.
If such an area is reserved, the Final Plan shall provide how title to the reserved
land shall be held and how costs of development, maintenance and taxes shall be
met.
2.
Included in the instrument of conveyance to each property owner of the
subdivision shall be a statement of:
a)
The manner of providing for the cost of development and maintenance
and for property taxes of the reserved land.
b)
If appropriate, the individual property owner's pro rata share of
development costs, maintenance cost and property taxes of the reserved
land.
c)
Land designed for public use shall not be subdivided for any other
purpose. This prohibition does not apply to land areas designed for later
development if the Subdivision Plan includes provision for development
in discrete stages.
d)
Any area designated for common use shall be so arranged that each
property owner has access to it.
C.
Land reserved for open space purposes shall be a character, configuration and location
suitable for the particular use intended. A site intended to be used for active recreation
purposes, such as a playground or a play field, should be relatively level and dry. The
Planning Board shall review open space plans to determine if the subdivider has made a
maximum effort to preserve scenic vistas and make available land for trails and lookouts,
etc.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
22
D.
Reserved land acceptable to the Board and subdivider may be dedicated to the
municipality as a condition of approval.
E.
The proposed subdivision shall provide safe pedestrian access within the subdivision and
interconnection with existing facilities on abutting properties including connection and/or
preservation of existing snowmobile trails to accomplish the goals of the Comprehensive
Plan.
10.3
Land Not Suitable for Development. The following lands shall not be included in the
calculations of building density for the purpose of meeting the requirements of Mobile Home
Parks and Multi-family Developments of three or more units.
A.
Land which is located within the 100-year frequency floodplain as identified by the
Federal Emergency Management Agency, Flood Insurance Administration, unless the
subdivider shows proof through the submittal of materials prepared by a Professional
Land Surveyor which show that the property in question lies above the 100-year flood
level. The elevation of filled or made land shall not be considered.
B.
Land which is part of a right-of-way, or easement, including utility easements.
C.
Land that has been created by filling or draining a pond or wetland.
10.4
Blocks. Where street lengths exceed 1,000 feet between intersections with other streets, the
Board may require a utility/pedestrian easement, at least 20 feet in width, to provide for
underground utility crossings and/or a pedestrian pathway of at least five feet in width.
Maintenance obligations of the easement shall be included in the written description of the
easement.
10.5
Lots
A.
All lots shall meet the minimum requirements of the Town of Turner's Zoning Ordinance.
The lot configuration should be designed to maximize the use of solar energy on building
sites with suitable orientation. Lack of restrictive covenants may necessitate larger lots.
B.
Lot configuration and area shall be designed to provide for adequate off-street parking
and service facilities based upon the type of development contemplated. Wherever
possible, parking areas shall be laid out to coincide with building locations to maximize
solar energy gain.
C.
Lots with multiple frontages shall be avoided wherever possible. When lots do have
frontage on two or more roads, the plan, and deed restrictions shall indicate vehicular
access shall be located only on the less traveled way.
D.
Wherever possible, side lot line shall be perpendicular to the street.
E.
The subdivision of tracts into parcels with more than twice the required minimum lot size
shall be laid out in such a manner as either to provide for or preclude future
resubdivision.
F.
In the Rural I and II Districts, as defined in the Town of Turner Zoning Ordinance, each
lot shall contain a minimum of 20,000 square feet of land area that is not located in the
100-year floodplain, does not contain slopes greater than 20 percent and considered a
fresh water wetland.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
23
10.6
Utilities
A.
The Planning Board may require utilities serving the subdivision to be installed
underground.
B.
Underground utilities shall be installed prior to the installation of the final gravel base of
the road. All underground utilities shall be properly marked to avoid damage by future
excavations.
C.
Street lighting, if required by the Planning Board, shall meet specifications established by
the Planning Board.
10.7
Required Improvements. The following improvements are required for all subdivisions unless
waived by the Board in accordance with provisions of this Ordinance.
A.
Monuments
1.
Permanent granite or cement monuments not less than four (4) inches square in
width or iron reinforcement rods at least 5/8 inches across the top and at least four
(4) feet in the ground shall be installed as follows:
1.
Monuments shall be set at all street intersections and points of curvature,
but no further than 750 feet apart along street lines without curves or
intersections.
2.
Monuments shall be set at all corners and angle points of the subdivision
boundaries and all lot boundary and angle points.
B.
Water Supply
1.
If a central water supply system is provided by the subdivider, the location and
protection of the source, and the design, construction and operation of the system
shall conform to the standards of the State of Maine Rules of the Department of
Human Services Relating to Drinking Water (10-144 A.C.M.R. 231).
2.
Based on the recommendations of the Fire Department the Board may require the
subdivider to install systems to provide water for fire fighting purposes or to pay
for such systems.
C.
Sewage Disposal
1.
The developer shall submit evidence of soil suitability for subsurface sewage
disposal prepared by a Maine Licensed Site Evaluator in full compliance with the
requirements of the State of Maine Subsurface Wastewater Disposal Rules.
D.
Surface Drainage
1. Where a subdivision is traversed by a stream, river, or surface water drainage
way, or where the Board has determined that surface water runoff to be created
by the subdivision should be controlled, there shall be provided easements or
drainage rights-of-way with swales, culverts, catch basins or other means of
channeling surface water within the subdivision and over other properties. This
storm water management system shall be designed by a Licensed Professional
Engineer.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
24
2. Drainage easements for existing watercourses or proposed drainage ways
shall be provided and indicated on the plan at least thirty feet wide,
conforming substantially with the lines of existing natural drainage.
3. A storm water drainage plan, showing ditching, culverts, storm drains,
easements, and other proposed improvements, meeting the standards of
Article XI. 2-3 shall be submitted.
E. Conservation, Erosion and Sediment Control.
Erosion of soil and sedimentation of water-courses and water bodies shall be
minimized. The following measures shall be included, where applicable, as part
of any Subdivision review and approval.
a.
Stripping of vegetation, regrading or other development shall be done in
such a way as to minimize erosion.
b.
Development shall keep cut-fill operations to a minimum and ensure
conformity with topography so as to create the least erosion potential and
so as to adequately handle surface water runoff.
c.
The disturbed area and the duration of exposure of the disturbed area shall
be kept to a practical minimum.
d.
Disturbed soils shall be stabilized as quickly as practical.
e.
Temporary vegetation or mulching shall be used to protect exposed critical
areas during development.
f.
The permanent (final) vegetation and mechanical erosion control measure
shall be installed as soon as practical on the site.
g.
Until the disturbed area is stabilized, sediment in the runoff water shall be
trapped by the use of debris basins, sediment basins, silt traps or other
acceptable methods.
h.
Whenever sedimentation is caused by stripping vegetation, regrading or
other development, it shall be the responsibility of the developer causing
such sedimentation to remove it from all adjoining surfaces, drainage
systems and watercourses and to repair any damage at his or her expense
as quickly as possible.
i.
Maintenance of drainage facilities or watercourses originating and
completely on private property is the responsibility of the owner to the
point of open discharge at the property line or at a communal watercourse
within the property.
j.
The standards set forth in the Maine Erosion and Sediment Control
Handbook for Construction, Best Management Practices (March 1991 and
as amended) shall be employed.
k.
The most current standards set forth in the Stormwater Management Law
Town of Turner Subdivision Ordinance
Amended May 22, 2021
25
administered by the Maine Department of Environmental Protection shall
be employed.
10.8
Land Features
A.
Topsoil shall be considered part of the subdivision and shall not be removed from the site
except for surplus topsoil from roads, parking areas, and building excavations.
B.
Except for normal thinning, landscaping, and cutting trees to provide access to direct
sunlight,existing vegetation shall be left intact to prevent soil erosion. The Board shall
require a developer to take measures to correct and prevent soil erosion in the proposed
subdivision.
C.
The Board shall require a developer to take measures as contained in the Maine Erosion
and Sediment Control Best Management Practices to correct and prevent soil erosion in
the proposed subdivision.
10.9
Phosphorous Export
Projects proposed within the direct watershed of a lake or pond listed below shall be designed to
limit phosphorous runoff to the levels defined below. The Board shall keep an accurate record of
permits issued by watershed using an appropriate record keeping system, and shall review actual
development rates and recommend adjustments to the table at five year intervals, subject to a
reasonable appropriation by the Town to conduct such a reassessment, or the availability of
adequate State or regional grant programs or technical assistance programs. Adjustments shall be
made by amendment of this Ordinance and the Town's Comprehensive Plan.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
26
10.10 Lake Protection Level
LPL
Phosphorus
Loads
Per Acre Phosphorus
Load (pounds)
Bear Pond
High
2.31
0.035
Blacksnake Pond
High
0.13
0.024
Crystal Pond
High
3.04
0.035
Lake Auburn
High
3.74
0.082
Lard Pond
High
0.85
0.034
Lily Pond
High
2.16
0.039
Little Wilson Pond
High
7.27
0.031
Mud Pond (1)
Medium
8.11
0.025
Mud Pond (2)
High
0.39
0.037
Mud Pond (3)
High
0.39
0.042
Pleasant Pond
High
8.48
0.045
Round Pond
High
0.35
0.038
Sandy Bottom Pond
High
0.74
0.037
The Basin
High
0.13
0.020
(1) North of Little Wilson Pond
(2) Mud Pond in Buckfield
(3) North of Sandy Bottom Pond
a.
Phosphorous export from a proposed development shall be calculated according to the
procedures defined in "Phosphorous Control in Lake Watersheds: A Technical Guide for
Evaluating New Development" (Maine DEP et.al., September 1989 with revision in
1992 and as may be amended). Upon request, copies of all worksheets and calculations
shall be made available to the Planning Board.
b.
Phosphorous control measures shall meet the design criteria contained in "Phosphorus
Control in Lake Watersheds: A Technical Guide for Reviewing Development" (Maine
DEP et al., September 1989 with revisions in 1992 or as may be amended). The Planning
Board shall require the reasonable use of vegetative buffers, limits on clearing, and
minimizing road lengths, and shall encourage the use of other non-structural measures
prior to allowing the use of high-maintenance structural measures such as infiltration
systems and wet ponds.
10.11 Construction in Flood Hazard Areas
When any part of a subdivision is located in a special flood hazard area as identified by the
Federal Emergency Management Agency, the plan shall indicate that all principle structures on
Town of Turner Subdivision Ordinance
Amended May 22, 2021
27
lots in the subdivision shall be constructed with their lowest floor, including the basement, at
least one foot above the 100-year flood elevation. Such a restriction shall be included in the deed
to any lot which is included or partially included in the flood hazard area.
10.12 Mobile Home Parks
Proposed new mobile home parks and expansions to existing mobile home parks which would
constitute a subdivision as defined shall comply with the provisions of this Ordinance, the Town
of Turner's Zoning Ordinance, the Town of Turner's Street Construction Ordinance and the
following:
A.
The mobile home park will be designed so that each mobile home is placed on a defined
lot clearly marked having access from a roadway within the mobile home park. The
roadways and lots will be laid out to provide safe and convenient access to every mobile
home lot. The lot layout will be designed so that the vehicular access to each lot is from
the internal road system of the mobile home park and not from existing public streets.
B.
Each lot within in a mobile home park shall be of such dimensions to provide for two (2)
off-street parking spaces. Each park space shall contain minimum of 200 square feet.
The Planning Board may require additional parking areas within the mobile home park.
C.
Lots within mobile home parks shall not be reduced below those required in the Town of
Turner's Zoning Ordinance.
D.
Streets and walkways designed for the general use of the manufactured home community
residents shall be lighted during the hours of darkness. Lighting shall be provided and
maintained to produce a minimum of 0.1 footcandle (1.1 lux) at street level throughout
the system.
E.
A 50-foot buffer strip shall be provided along all property boundaries. No structures,
streets or utilities may be placed in the buffer strip except that they may cross a buffer
strip to provide services to the park.
F.
No lot in a mobile home park may be sold or conveyed without prior approval of the
Planning Board. Any such lot sold or conveyed shall meet the lot size requirement for a
single-family dwelling as contained in the Town of Turner's Zoning Ordinance.
10.13 Municipal Services
When the Board finds, based upon the recommendation of Department heads, that municipal
services do not have sufficient capacity to service the proposed subdivision, the Board may
require phasing of the subdivision to allow for the development of expanded municipal services,
deny the application or require the applicant to assist in upgrading municipal services.
10.14 Open Space Development
Open space subdivisions shall comply with the provisions set forth in the Town of Turner's
Zoning Ordinance.
10.15 Traffic Conditions
When conflicts exist between this Section and a Driveway Permit or Entrance Permit onto Route
4, Route 117, Route 219, Center Bridge Road, Upper Street or Weston Road, issued by the Maine
Department of Transportation, the most stringent or restrictive shall apply.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
28
A.
Where a subdivision will be accessed from Route 4 a common access or shared
driveways should be developed.
B.
A subdivision to be located in a Commercial II, Rural I or Rural II Zoning District as
defined in the Town of Turner Zoning Ordinance that will have lot access from an
existing street that has a peak hour volume of 200 vehicle trips or greater as determined
from available traffic counts from the Maine Department of Transportation shall be
limited to one (1) access point for the first lot and one (1) additional access point for each
500 feet of frontage beyond the first lot on such street. Where the subdivision will have
more than one (1) access point, spacing shall comply with Sections 10.15.E, F, and G.
A subdivision to be located in a Commercial I Zoning District as defined in the Town of
Turner Zoning Ordinance that will have lot access from an existing street that has a peak
hour volume of 200 vehicle trips or greater as determined from available traffic counts
from the Maine Department of Transportation shall be limited to one (1) access point for
the first lot and one (1) additional access point for each 400 feet of frontage beyond the
first lot on such street. Where the subdivision will have more than one access point,
spacing shall comply with Sections 10.15.E, F, and G.
C.
Where a lot has frontage on two or more streets, the access to the lot shall be provided to
the lot across the frontage and to the street where there is lesser potential for traffic
congestion and for hazards to traffic and pedestrians unless other factors make it not
practical.
D.
The Planning Board may require, based upon site distances and volume of traffic, the use
of shared or common driveways in the Rural I and Rural II Districts as defined in the
Town of Turner Zoning Ordinance, where such lots will be accessed by off-site public
streets.
E.
Minimum corner clearance shall be measured from the point of tangency for the corner to
the point tangency for the access by type of driveway and meet the following.
Driveway
Minimum Corner Clearance (feet)
Intersection
Signalized
Intersection
Unsignalized
Low Volume <50 trips/day
150
50
Medium Volume >50-100 trips/day
<200 trips/hour
150
50
High Volume >200 trips/hour
500
250
F.
Minimum distances between driveways serving the same parcel, measured from point of
tangency to point of tangency by type of driveway, shall be as follows:
Town of Turner Subdivision Ordinance
Amended May 22, 2021
29
Driveway Type
Minimum Spacing to Adjacent
Driveway by Driveway Type
High w/o RT
(feet)
High w/RT
(feet)
Medium Volume
75
High Volume W/O RT (without
right-turn channelization)
75
150
High Volume W/RT (with right-
turn channelization)
75
250
500
G.
The minimum distance between driveways and property line, as measured from point of
tangency, shall be:
Driveway Type
Minimum Spacing to
Property Line (ft.)
Low Volume
Medium Volume
High Volume (without right-turn
channelization)
High Volume (with right-turn channelization)
10
20
75
75
For lots with shared access, the driveway may be located along the property line. The
minimum spacing to property line may be varied if (1) the safest point of access to the
site is closer to the property line and (2) there are at least 20 feet of separation between
low volume driveways serving adjacent parcels, 40 feet of separation between medium
volume driveways, and 150 feet of separation between high volume driveways.
H.
When the proposed development is to be located on the opposite side of an existing
development, the driveway shall be directly opposite of the existing driveway or
separated from the opposite driveway by a minimum of seventy-five (75) feet whenever
possible.
10.16 Ground Water Quality
A.
1.
When a hydrogeologic assessment is submitted, by request of the Board, the
assessment shall contain at least the following information:
a.
A map showing the basic soils types.
b.
The depth to the water table at representative points throughout the
subdivision.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
30
c.
Drainage conditions throughout the subdivision.
d.
Data on the existing ground water quality, either from test wells in the
subdivision or from existing wells on neighboring properties.
e.
An analysis and evaluation of the effect of the subdivision on ground
water resources. In the case of residential developments, the evaluation
shall, at a minimum, include a projection of post development nitrate-
nitrogen concentrations at any wells within the subdivision, at the
subdivision boundaries and at a distance of 1000 feet from potential
contamination sources, whichever is a shorter distance.
f.
A map showing the location of any subsurface wastewater disposal
systems and drinking water wells within the subdivision and within 100
feet of the subdivision boundaries.
2.
The subdivision will not result in the existing ground water quality becoming
inferior to the physical, biological, chemical, and radiological levels for raw and
untreated drinking water supply sources specified in the Maine State Drinking
Water Regulations, pursuant to 22 M.R.S.A., Section 601.
3.
If ground water contains contaminants in excess of the primary standards, and the
subdivision is to be served by on-site ground water supplies, the applicant shall
demonstrate how water quality will be improved or treated.
4.
If ground water contains contaminants in excess of the secondary standards, the
subdivision shall not cause the concentration of the parameters in question to
exceed 150% of the ambient concentration.
5.
Subsurface waste water disposal systems and drinking water wells shall be
constructed as shown on the map submitted with the assessment. If construction
standards for drinking water wells or other measures to reduce ground water
contamination and protect drinking water supplies are recommended in the
assessment, those standards shall be included as a note on the Final Plan, and as
restrictions in the deeds to the affected lots.
10.17 Protection of Significant Wildlife Habitat
Applicants proposing to subdivide land in or within 75 feet to wildlife resources identified in the
Town of Turner Comprehensive Plan or by the Maine Department of Inland Fisheries and
Wildlife shall consult with a recognized wildlife or fisheries consultant or the Maine Department
of Inland Fisheries and Wildlife and provide their written comments to the Board. The Board
may consult with the Maine Department of Inland Fisheries and Wildlife and may impose any
recommendations by the Maine Department or consultant as conditions of approval.
10.18 Scenic Locations
The Planning board shall consider the existence of a scenic site or view location as identified in
the Town of Turner Comprehensive Plan and the impact of the proposed subdivision on such a
site or view. The Board may require the placement or visual qualities of structures on lots in such
locations as to minimize the negative impacts of the subdivision on such sites and views.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
31
10.19 Archaeological Sites
Any proposed subdivision activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as
determined by the permitting authority shall be submitted by the applicant to the Maine Historic
Preservation Commission for review and comment, at least 20 days prior to action being taken by
the permitting authority. The permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
10.20 Solid Waste
All Solid Waste shall be disposed of at a Department of Environmental Protection Licensed
Facility.
10.21 Financial and Technical Capacity
A.
Financial Capacity.
The applicant shall demonstrate the availability of financial resources sufficient to
implement the proposed plan. In determining the applicant's financial capacity, the
Board shall consider cost estimates for implementation of the plan, letters from
prospective sources of financing, the proposed time frame for construction, and
performance guarantees required of the applicant.
B.
Technical Ability.
1. The applicant shall demonstrate the qualifications of the contractors and
consultants who will supervise, construct and inspect the improvements associated
with the proposed subdivision.
2.
In determining the applicant's technical ability the Board shall consider the
applicant's previous experience, the experience and training of the applicant's
consultants and contractors, and the number and nature of any violations of
previous approvals granted to the applicant.
ARTICLE XI. STREET AND STORM DRAINAGE DESIGN AND
CONSTRUCTION STANDARDS
11.1
General Requirements
A.
All streets proposed as an element of a subdivision shall comply with the Town of
Turner's Street Construction Ordinance.
B.
All street designs as required by the Town of Turner's Street Construction Ordinance
shall be submitted as an element of the Subdivision Application as required by this
Ordinance.
C.
Street names shall be proposed by the applicant and approved by the Board. Streets that
are continuations of existing streets shall be given the same name of the existing street.
Names of new streets shall not duplicate nor bear the phonetic resemblance of the names
Town of Turner Subdivision Ordinance
Amended May 22, 2021
32
of existing streets with the Town. No street name shall be given the common name of a
person.
11.2
Storm Water Management Design Standards
A.
All stormwater improvements within the subdivision shall be designed to be in
compliance with the most current standards of the Stormwater Management Law as
administered by the Maine Department of Environmental Protection.
B.
All subdivisions that fall below the minimum thresholds of the Stormwater Management
Law shall comply with the Conservation, Erosion and Sediment Control Standards of
Article X, Section 10.7. E.
C.
Wherever the storm drainage system is not within the right-of-way of a public street,
perpetual easements shall be provided to the Town allowing maintenance and
improvement of the system.
D.
Where soils require a subsurface drainage system, the drains shall be installed and
maintained separately from the storm water drainage system.
11.3
Storm Drainage Construction Standards
A.
Materials
1.
Reinforced Concrete Pipe. Reinforced Concrete Pipe shall meet the
requirements of ASTM Designation C-76 (AASHTOM 170). Pipe classes shall
be required to meet the soil and traffic loads with a safety factor of 1.2 on the .01
inch crack strength with a Class B bedding. Joints shall be of the rubber gasket
type meeting ASTM Designation C 443-70, or of an approved performed plastic
jointing material such as "Ramnek". Perforated Concrete Pipe shall conform to
the requirements of AASHTOM 175 for the appropriate diameters.
2.
Asbestos Cement Pipe. Asbestos Cement Pipe shall meet the requirements of
ASTM Designation C-428 (AASHTOM 189). Pipe classes shall be required to
meet the soil and traffic loads with a safety factor of 1.5 on the crushing strength.
Joints shall be of the rubber gasket type meeting ASTM Designation D-1869-63,
or of an approved performed plastic sleeve type.
3.
Corrugated Metal Pipe. Corrugated Metal Pipe shall be bituminous coated
meeting the requirements of AASHTO Designation M 190 Type C for iron or
steep pipe or AASHTO Designation M 196 for aluminum alloy pipe for sectional
dimensions and type of bituminous coating. Pipe gauge shall be as required to
meet the soil and traffic loads with a deflection of not more than 5%.
4.
ABS Pipe. ABS (Acrylonitrile-butadiene-styrene) composite pipe and fittings
shall conform to the requirements of AASHTOM 264 and AASHTOM 265.
Perforated pipe shall conform to the requirements of AASHTOM 36, Type III.
5.
Corrugated Plastic Pipe. Corrugated Plastic Pipe shall conform to the
requirements of AASHTO M-252.
6.
Manholes. Manholes shall be of precast concrete truncated cone section
Town of Turner Subdivision Ordinance
Amended May 22, 2021
33
construction meeting the requirements of ASTM Designation C 478 or precast
concrete manhole block construction meeting the requirements of ASTM
Designation C 139, radial type. Bases may be cast in place 3,000 psi 28 day
strength concrete or may be of precast concrete, placed on a compacted
foundation of uniform density. Metal frames and traps shall be set in a full mortar
bed and with tops shall conform to the requirements of AASHTOM 103 for
carbon steep castings, AASHTOM 105, Class 30 for gray iron castings or
AASHTOM 183 (ASTMA 283, Grade B or better) for structural steel.
7.
Catch Basins. Catch Basins shall be of precast concrete truncated cone section
construction meeting the requirements of ASTM Designation C 478 or precast
concrete manhole block construction meeting the requirements of ASTM
Designation C 139, radial type. Casting shall be square cast iron sized for the
particular inlet condition with the gratings perpendicular to the curb line. Bases
may be cast in place 3,000 psi 28 day strength concrete or may be of precast
concrete, placed on a compacted foundation of uniform density. Metal frames and
traps shall be set in a full mortar bed and with tops shall conform to the
requirements of AASHTOM 103 for carbon steel castings, AASHTOM 105, Class
30 for gray iron castings or AASHTOM 183 (ASTMA 283, Grade B or better) for
structural steel.
B.
Drain inlet alignment shall be straight in both horizontal and vertical alignment unless
specific approval of a curvilinear drain is obtained in writing from the Board, after
consultation with the Municipal Engineer.
C.
Manholes shall be provided at all changes in vertical or horizontal alignment and at all
junctions. On straight runs, manholes shall be placed at a maximum of 400 foot intervals.
D.
Upon completion each catch basin or manhole shall be cleaned of all accumulation of silt,
debris, or foreign matter and shall be kept clean until final acceptance.
11.4
Certification of Construction
Upon completion of street construction and prior to a vote by the Municipal Officers to submit a
proposed public way to the legislative body, a written certification signed by a licensed
professional engineer registered in the State of Maine shall be submitted to the Municipal
Officers at the expense of the applicant, certifying that the proposed way meets or exceeds the
design and construction requirements of these regulations. "As built" plans shall be submitted to
the Municipal Officers.
ARTICLE XII. PERFORMANCE GUARANTEES
12.1
Types of Guarantees. With submittal of the application for Final Plan approval, the subdivider
shall indicate one of the following performance guarantees that will be provided for an amount
adequate to cover the total construction costs of all required infrastructure improvements, taking
into account the time-span of the construction schedule and the inflation rate for construction
costs.
A.
Either a certified check payable to the Town or a savings account or certificate of deposit
naming the Town as owner, for the establishment of an escrow account.
B.
A performance bond payable to the Town issued by a surety company, approved by the
Municipal Officers.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
34
C.
An irrevocable letter of credit from a financial institution establishing funding for the
construction of the subdivision, from which the Town may draw if construction is
inadequate, approved by the Municipal Officers.
D.
An offer of conditional agreement limiting the number of units built or lots sold until all
required infrastructure improvements have been constructed.
The conditions and amount of performance guarantee shall be determined by the Board with the
advice of the Town Engineer, Road Commissioner and Municipal Officers.
12.2
Contents of Guarantee. The performance guarantee shall contain a construction schedule, cost
estimates for each major phase of construction taking into account inflation, provisions for
inspections of each phase of construction, provisions for the release of part or all of the
performance guarantee to the developer, and a date after which the developer will be in default,
and the Town shall have access to the funds to finish construction.
12.3
Escrow Account. A cash contribution to the establishment of an escrow account shall be made
by either a certified check made out to the municipality, the direct deposit into a savings account,
or the purchase of a certificate of deposit. For any account opened by the subdivider, the
municipality shall be named as owner or co-owner, and the consent of the municipality shall be
required for a withdrawal. Any interest earned on the escrow account shall be returned to the
subdivider except for any portion of the interest earned which was needed, in addition to the
principle of the escrow account, to pay for completion of the required improvements.
12.4
Performance Bond. A performance bond shall detail the conditions of the bond, the method for
release of the bond or portions of the bond to the subdivider, and the procedures for collection by
the municipality. The bond documents shall specifically reference the subdivision for which
approval is sought.
12.5
Letter of Credit. An irrevocable letter of credit from a bank or other lending institution shall
indicate that funds have been set aside for the construction of the subdivision and may not be used
for any other project or loan.
12.6
Conditional Agreement. The Board, at its discretion may permit for the sub divider to enter
into a binding agreement with the municipality in lieu of the other financial performance
guarantees. Such an agreement shall provide for approval of the Final Plan on the condition that
no units be built or lots sold until either:
A.
It is certified by the Board, or its agent, that all of the required improvements have been
installed in accordance with these regulations and the regulations of the appropriate
utilities; or
B.
A performance guarantee, acceptable to the municipality, is submitted in an amount
necessary to cover the completion of the required improvements at an amount adjusted
for inflation and prorated for the portions of the required improvements already installed.
Notice of the agreement and any conditions shall be on the Final Plan which is recorded
by the subdivider at the Registry of Deeds. Release from the agreement shall follow the
procedures for release of the performance guarantees contained in Section 12.8. Proof of
recording shall be provided by the subdivider to the Board.
Town of Turner Subdivision Ordinance
Amended May 22, 2021
35
12.7
Phasing of Development. The Board may approve plans to develop a major subdivision in
separate and distinct phases. This may be accomplished by limiting final approval to those lots
abutting that section of the proposed subdivision street which is covered by a performance
guarantee. When development is phased, road construction shall commence from an existing
public way. Final approval of lots in subsequent phases shall be given only upon satisfactory
completion of all requirements pertaining to previous phases.
12.8
Release of Guarantee. Prior to the release of any part of the performance guarantee, the Board
shall determine to its satisfaction, that the proposed improvements meet or exceed the design and
construction requirements for that portion of the infrastructure improvements for which the
release is requested.
12.9
Default. If, upon inspection, it is found that any of the required infrastructure improvements
have not been constructed in accordance with the plans and specifications filed as part of the
application, the Code Enforcement Officer shall so report in writing to the Municipal Officers, the
Board, and the sub divider or builder. The Municipal Officers shall take any steps necessary to
preserve the Town's rights.
.
12.10 Privately-Owned Roads. Where the subdivision streets are to remain privately-owned roads, the
following words shall appear on the recorded plan.
"All roads in this subdivision shall remain private roads to be maintained by the
developer or the lot owners and shall not be accepted or maintained by the Town."
12.11 Improvements Guaranteed. Performance guarantees shall be tendered for all infrastructure
improvements required by Section 10.7 11.1 and 11.2 of this ordinance, as well as any other
improvements required by the Board.
12.12 At least five days prior to commencing each major phase of construction of required
infrastructure improvements, the sub divider or builder shall provide the Town with the
type and amount of the performance guarantee approved in Section 12.1 above.
.
ARTICLE XIII. WAIVERS
13.1
Any requests for waivers from submission requirements and/or review standards shall be
in writing. Waiver requests shall indicate the requirements requested to be waived and
shall indicate what special circumstances exist that the required improvements or
standards are not necessary to provide for the public health, safety, or welfare, or are
inappropriate because of inadequate or lacking connecting facilities adjacent to or in
proximity of the proposed development.
13.2
Where the Board finds, based on written justification by the applicant, and makes written
findings of fact that due to extraordinary and unnecessary hardships that may result from
strict compliance of this Ordinance, or where there are special circumstances of a
particular application, certain required improvements or review standards are not
necessary to provide for public health, safety or welfare, or are inappropriate because of
Town of Turner Subdivision Ordinance
Amended May 22, 2021
36
inadequate or lacking connecting facilities adjacent to or in proximity of the proposed
development, it may waive this requirement, subject to appropriate conditions provided
that the performance standards of this ordinance have been or will be met. Waivers may
not be granted if the waiver will have the effect of nullifying the intent and purpose of the
Comprehensive Plan, this Ordinance, or any other ordinance or law, or if this ordinance
expressly does not allow a waiver from the requirement a waiver is sought. In granting
waivers, the Planning Board shall require such conditions as will assure the purpose of
this ordinance is met.
13.3
When the Board grants a waiver to any of the improvements required by this ordinance, the Final
Plan to be recorded at the Registry of Deeds, shall indicate the waivers granted and the date
which they were granted.
ARTICLE XIV. AMENDMENTS
14.1
Initiation of Amendments. An amendment to this Ordinance may be initiated by:
A.
The Planning Board, provided a majority of the Board has so voted;
B.
Request of the municipal officers; or
C.
Written petition of a number of voters equal to at least 10% of the number of votes cast in
the municipality at the last gubernatorial election.
14.2
The Planning Board shall conduct a public hearing on the proposed amendment. Notification of
the hearing shall be posted in the Town Office at least thirteen (13) days before the hearing and
published in a newspaper of general circulation in the municipality at least two (2) times with the
date of the first publication at least twelve (12) days before the hearing and the date of the 2nd
publication at least seven (7) days before the hearing. The Planning Board shall make a report and
its recommendation on the proposed amendment within ten (10) days after the public hearing has
been closed.
14.3
Adoption of Amendment. An amendment to this Ordinance may be adopted by a majority vote
of the Town Meeting.
ARTICLE XV. APPEALS
15.1
An aggrieved party may appeal any decision of the Board under this Ordinance within 30 days
from the date of that decision to Androscoggin County Superior Court.
ARTICLE XVI. SUBDIVISION AMENDMENTS
16.1 Fees.
A.
The fee for any amendment when the number of lots remains the same, and there is no
substantial change to roads or drainage systems, shall be $25 plus planner fees.
B.
The fee for any amendment, when three or less new lots are created, shall be a $25
Town of Turner Subdivision Ordinance
Amended May 22, 2021
37
publishing and notice fee and $100 for the first new lot created and $50 for each
additional lot plus planner fees.
C.
The fee for amendment, when there are substantial changes to roads and drainage systems
or more than three lots are created, shall be all fees and escrow accounts required by a
new application.
16.2
Revisions to Approved Plans
No change, erasures, modifications, or revisions shall be made in any Final Plan after approval
has been given by the Planning Board and endorsed in writing on the Plan, by the original sub
divider at any time or within five years of the approval if other than the original subdivider,
unless the revised Final Plan is first submitted and the Board approves any modifications, except
in accordance with Article 9.1.C. The Board shall make findings that the revised plan meets the
standards of Title 30-A, M.R.S.A. §4404, and this Ordinance. In the event that a Plan is recorded
without complying with this requirement, it shall be considered null and void, and the Board shall
institute proceedings to have the Plan stricken from the records of the Registry of Deeds.
Tile 30-A MRSA Section 4406.1.E
Any person who, after receiving approval from the municipal reviewing authority or approval
under Title 38, chapter 3, subchapter I, article 6 and recording the plan at the registry of deeds,
constructs or develops the subdivision or transfers any lot in a manner other than depicted on
the approved plans or amendments or in violation of any condition imposed by the municipal
reviewing authority or the Department of Environmental Protection, when applicable, must be
penalized in accordance with section 4452.
3/12/91
Amended March 14, 1992
Amended June 20, 1992
Amended June 12, 1993
Amended June 11, 1994
Amended April 13, 1996
Amended July 21, 1997
Amended April 18, 1998
Amended April 10, 1999
Amended April 8, 2000
Amended April 7, 2001
Amended April 6, 2002
Amended April 5, 2003
Amended April 3, 2004
Amended April 9, 2005
Amended April 8, 2006
Amended April 5, 2008
Amended April 4, 2009
Amended April 10, 2010
Amended April 5, 2014
Amended May 19, 2018
Amended May 21, 2021