This is the exact embedded text of the captured official document.
Snapshot 0a5c37a84a4b · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Shoreland-Zoning-PDF"
municipality_ids:
- gx-011484
content_type: "application/pdf"
captured_at: "2026-10-20T17:39:58+00:00"
normalize_method: "pdf-pymupdf"
normalize_version: "0.2"
needs_ocr: false
char_count: 144602
---
Town of Veazie
Chapter 30 - Shoreland Zoning
Adopted:
November 17, 2014
Amended:
TRUE ATTESTED
January 9, 2017
COPY
This page left intentionally blank.
Table of Contents
30.01
PURPOSE .............................................................................................................. 1
30.02
AUTHORITY ........................................................................................................... 1
30.03
APPLICABILITY ...................................................................................................... 1
30.04
EFFECTIVE DATE ................................................................................................... 1
30.05
AVAILABILITY ........................................................................................................ 1
30.06
SEVERABILITY ....................................................................................................... 1
30.07
CONFLICTS WITH OTHER ORDINANCES .................................................................. 1
30.08
AMENDMENTS ....................................................................................................... 2
30.09
DISTRICTS AND ZONING MAP ................................................................................ 2
30.10
INTERPRETATION OF DISTRICT BOUNDARIES ......................................................... 2
30.11
LAND USE REQUIREMENTS ..................................................................................... 2
30.12
NON-CONFORMANCE ............................................................................................. 3
30.13
ESTABLISHMENT OF DISTRICTS ............................................................................. 8
30.14
TABLE OF LAND USES ............................................................................................ 9
30.15
LAND USE STANDARDS .........................................................................................11
30.16
ADMINISTRATION ................................................................................................32
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 1 of 50
30.01
PURPOSE
The purpose of this Ordinance is to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other
wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to protect
archaeological and historic resources; to protect coastal wetlands; to control building sites,
placement of structures and land uses; to conserve shore cover, and visual as well as actual
points of access to waters; to conserve natural beauty and open space; and to anticipate and
respond to the impacts of development in shoreland areas.
30.02
AUTHORITY
This Ordinance has been prepared in accordance with the provisions of Title 38 sections 435-449
of the Maine Revised Statutes Annotated (M.R.S.A.).
30.03
APPLICABILITY
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the normal high-
water line of a river; within 250 feet, horizontal distance, of the upland edge of a coastal wetland,
including all areas affected by tidal action; and all land areas within 75 feet, horizontal distance,
of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending or located below the normal high-water line of a water body or within
a wetland.
30.04
EFFECTIVE DATE
This Ordinance, which was adopted by the municipal legislative body on June 9, 2015, shall not
be effective unless approved by the Commissioner of the Department of Environmental
Protection. A certified copy of the Ordinance, or Ordinance Amendment, attested and signed by
the Municipal Clerk, shall be forwarded to the Commissioner for approval. If the Commissioner
fails to act on this Ordinance or Ordinance Amendment, within forty-five (45) days of his/her
receipt of the Ordinance, or Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
30.05
AVAILABILITY
A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be accessible to
any member of the public. Copies shall be made available to the public at reasonable cost, at the
expense of the person making the request. Notice of availability of this Ordinance shall be posted.
30.06
SEVERABILITY
Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
30.07
CONFLICTS WITH OTHER ORDINANCES
Whenever a provision of this Ordinance conflicts with or is inconsistent with another provision of
this Ordinance or of any other ordinance, regulation or statute administered by the municipality,
the more restrictive provision shall control.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 2 of 50
30.08
AMENDMENTS
This Ordinance may be amended by majority vote of the legislative body. Copies of amendments,
attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body and
shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment
is automatically approved. Any application for a permit submitted to the municipality within the
forty-five (45) day period shall be governed by the terms of the amendment, if such amendment
is approved by the Commissioner.
30.09
DISTRICTS AND ZONING MAP
30.09.01
Official Shoreland Zoning Map
The areas to which this Ordinance is applicable are hereby divided into the following districts
as shown on the Official Shoreland Zoning Map which is made a part of this Ordinance:
Resource Protection
Stream Protection
Limited Residential
Limited Industrial
30.09.02
Scale of Map
The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1 inch = 2000
feet. District boundaries shall be clearly delineated and a legend indicating the symbols for
each district shall be placed on the map.
30.09.03
Certification of Official Shoreland Zoning Map
The Official Shoreland Zoning Map shall be certified by the attested signature of the Municipal
Clerk and shall be located in the municipal office. In the event the municipality does not have
a municipal office, the Municipal Clerk shall be the custodian of the map.
30.09.04
Changes to the Official Shoreland Zoning Map
If amendments, in accordance with Section 30.08, are made in the district boundaries or other
matter portrayed on the Official Shoreland Zoning Map, such changes shall be made on the
Official Shoreland Zoning Map within thirty (30) days after the amendment has been approved
by the Commissioner of the Department of Environmental Protection.
30.10
INTERPRETATION OF DISTRICT BOUNDARIES
Unless otherwise set forth on the Official Shoreland Zoning Map, district boundary lines are
property lines, the centerlines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact location of district
boundary lines, the Board of Appeals shall be the final authority as to location.
30.11
LAND USE REQUIREMENTS
Except as hereinafter specified, no building, structure or land shall hereafter be used or occupied,
and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved, or altered and no new lot shall be created except in conformity with all of the regulations
herein specified for the district in which it is located, unless a variance is granted.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 3 of 50
30.12
NON-CONFORMANCE
30.12.01
Purpose
It is the intent of this Ordinance to promote land use conformities, except that non-conforming
conditions that existed before the effective date of this Ordinance or amendments thereto
shall be allowed to continue, subject to the requirements set forth in Section 12. Except as
otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
30.12.02
General
30.12.02.01
Transfer of Ownership
Non-conforming structures, lots, and uses may be transferred, and the new owner may
continue the non-conforming use or continue to use the non-conforming structure or lot,
subject to the provisions of this Ordinance.
30.12.02.02
Repair and Maintenance
This Ordinance allows, without a permit, the normal upkeep and maintenance of non-
conforming uses and structures including repairs or renovations that do not involve
expansion of the non-conforming use or structure, and such other changes in a non-
conforming use or structure as federal, state, or local building and safety codes may
require.
30.12.03
Non-Conforming Structures
30.12.03.01
Expansions
All new principal and accessory structures, excluding functionally water-dependent uses,
must meet water body, tributary stream, or wetland setback requirements contained in
Section 30.15.02.01. A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new structure, if such
addition or expansion does not increase the non-conformity of the structure and is in
accordance with sections 30.12.03.01.01
and 30.12.03.02.02 below.
30.12.03.01.01
Expansion of any portion of a structure within 25 feet of the normal high-water line of
a water body, tributary stream, or upland edge of a wetland is prohibited, even if the
expansion will not increase nonconformity with the water body, tributary stream or
wetland setback requirement. Expansion of an accessory structure that is located
closer to the normal high-water line of a water body, tributary stream, or upland edge
of a wetland than the principal structure is prohibited, even if the expansion will not
increase nonconformity with the water body, tributary stream, or wetland setback
requirement.
30.12.03.01.02
Notwithstanding section 30.12.03.01.01 above, if a legally existing nonconforming
principal structure is entirely located less than 25 feet from the normal high-water line
of a water body, tributary stream, or upland edge of a wetland, that structure may be
expanded as follows, as long as all other applicable municipal land use standards are
met and the expansion is not prohibited by Section 30.12.03.01.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 4 of 50
30.12.03.01.02.01
The maximum total footprint for the principal structure may not be expanded to a
size greater than 800 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the principal
structure may not be made greater than 15 feet or the height of the existing
structure, whichever is greater.
30.12.03.01.03
All other legally existing non-conforming principal and accessory structures that do not
meet the water body, tributary stream, or wetland setback requirements may be
expanded or altered as follows, as long as other applicable municipal land use
standards are met and the expansion is not prohibited by Section 30.12.03.01 or
Section 30.12.03.01.01 above.
30.12.03.01.03.01
For structures located less than 75 feet from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland, the maximum combined total
footprint for all structures may not be expanded to a size greater than 1,000 square
feet or 30% larger than the footprint that existed on January 1, 1989, whichever
is greater. The maximum height of any structure may not be made greater than
20 feet or the height of the existing structure, whichever is greater.
30.12.03.01.03.02
For structures located less than 100 feet from the normal high-water line of a great
pond classified as GPA or a river flowing to a great pond classified as GPA, the
maximum combined total footprint for all structures may not be expanded to a
size greater than 1,500 square feet or 30% larger than the footprint that existed
on January 1, 1989, whichever is greater. The maximum height of any structure
may not be made greater than 25 feet or the height of the existing structure,
whichever is greater. Any portion of those structures located less than 75 feet from
the normal high-water line of a water body, tributary stream, or upland edge of a
wetland must meet the footprint and height limits in Section 30.12.03.01.01 and
Section 30.12.03.01.03 above.
30.12.03.01.03.03
In addition to the limitations in subparagraphs (i) and (ii), for structures that are
legally nonconforming due to their location within the Resource Protection District
when located at less than 250 feet from the normal high-water line of a water
body or the upland edge of a wetland, the maximum combined total footprint for
all structures may not be expanded to a size greater than 1,500 square feet or
30% larger than the footprint that existed at the time the Resource Protection
District was established on the lot, whichever is greater.
The maximum height of any structure may not be made greater than 25 feet or
the height of the existing structure, whichever is greater, except that any portion
of those structures located less than 75 feet from the normal high-water line of a
water body, tributary stream, or upland edge of a wetland must meet the footprint
and height limits in Section 30.12.03.01.02.01 and Section 30.12.03.01 or Section
30.12.03.01.03.01 above.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 5 of 50
30.12.03.01.04
An approved plan for expansion of a non-conforming structure must be recorded by
the applicant with the registry of deeds, within 90 days of approval. The recorded plan
must show the existing and proposed footprint of the nonconforming structure, the
existing and proposed structure height, the footprint of any other structures on the
parcel, the shoreland zone boundary and evidence of approval by the municipal review
authority.
30.12.03.02
Foundations
Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 30.12.03.03
Relocation, below.
30.12.03.03
Relocation
A non-conforming structure may be relocated within the boundaries of the parcel on which
the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board or its
designee, and provided that the applicant demonstrates that the present subsurface
sewage disposal system meets the requirements of State law and the State of Maine
Subsurface Wastewater Disposal Rules (Rules), or that a new system can be installed in
compliance with the law and said Rules. In no case shall a structure be relocated in a
manner that causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of
the land, the potential for soil erosion, the location of other structures on the property
and on adjacent properties, the location of the septic system and other on-site soils
suitable for septic systems, and the type and amount of vegetation to be removed to
accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in
order to relocate a structure, the Planning Board shall require replanting of native
vegetation to compensate for the destroyed vegetation in accordance with Section
30.15.18. In addition, the area from which the relocated structure was removed must be
replanted with vegetation. Replanting shall be required as follows:
30.12.03.03.01
Trees removed in order to relocate a structure must be replanted with at least one
native tree, three (3) feet in height, for every tree removed.
If more than five (5) trees are planted, no one species of tree shall make up more
than 50% of the number of trees planted. Replaced trees must be planted no further
from the water or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged,
or removed must be reestablished within the setback area. The vegetation and/or
ground cover must consist of similar native vegetation and/or ground cover that was
disturbed, destroyed or removed.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 6 of 50
30.12.03.03.02
Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs,
trees, or a combination thereof.
30.12.03.04
Reconstruction or Replacement
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed, or damaged or destroyed,
regardless of the cause, by more than 50% of the market value of the structure before
such damage, destruction or removal, may be reconstructed or replaced provided that a
permit is obtained within eighteen (18) months of the date of said damage, destruction,
or removal, and provided that such reconstruction or replacement is in compliance with
the water body, tributary stream or wetland setback requirement to the greatest practical
extent as determined by the Planning Board or its designee in accordance with the
purposes of this Ordinance. In no case shall a structure be reconstructed or replaced so
as to increase its non-conformity. If the reconstructed or replacement structure is less
than the required setback it shall not be any larger than the original structure, except as
allowed pursuant to Section 30.12.03.01 above, as determined by the non-conforming
footprint of the reconstructed or replaced structure at its new location. If the total footprint
of the original structure can be relocated or reconstructed beyond the required setback
area, no portion of the relocated or reconstructed structure shall be replaced or
constructed at less than the setback requirement for a new structure. When it is necessary
to remove vegetation in order to replace or reconstruct a structure, vegetation shall be
replanted in accordance with Section 30.12.03.03 above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market
value, or damaged or destroyed by 50% or less of the market value of the structure,
excluding normal maintenance and repair, may be reconstructed in place if a permit is
obtained from the Code Enforcement Officer within one year of such damage, destruction,
or removal.
In determining whether the building reconstruction or replacement meets the setback to
the greatest practical extent the Planning Board or its designee shall consider, in addition
to the criteria in Section 30.12.03.03 above, the physical condition and type of foundation
present, if any.
30.12.03.05
Change of Use of a Non-Conforming Structure
The use of a non-conforming structure may not be changed to another use unless the
Planning Board, after receiving a written application, determines that the new use will
have no greater adverse impact on the water body, tributary stream, or wetland, or on
the subject or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and functionally water-dependent
uses.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 7 of 50
30.12.04
Non-Conforming Uses
30.12.04.01
Expansions
Expansions of non-conforming uses are prohibited, except that non-conforming residential
uses may, after obtaining a permit from the Planning Board, be expanded within existing
residential structures or within expansions of such structures as allowed in Section
30.12.03.01 above.
30.12.04.02
Resumption Prohibited
A lot, building or structure in or on which a non-conforming use is discontinued for a
period exceeding one year, or which is superseded by a conforming use, may not again
be devoted to a non-conforming use except that the Planning Board may, for good cause
shown by the applicant, grant up to a one-year extension to that time period. This
provision shall not apply to the resumption of the use of a residential structure provided
that the structure has been used or maintained for residential purposes during the
preceding five (5) year period.
30.12.04.03
Change of Use
An existing non-conforming use may be changed to another non-conforming use provided
that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in
Section 30.12.03.05 above.
30.12.05
Non-Conforming Lots
30.12.05.04
30.12.05.01 Non-Conforming Lots
A non-conforming lot of record as of the effective date of this Ordinance or amendment thereto
may be built upon, without the need for a variance, provided that such lot is in separate ownership
and not contiguous with any other lot in the same ownership, and that all provisions of this
Ordinance except lot area, lot width and shore frontage can be met. Variances relating to setback
or other requirements not involving lot area, lot width or shore frontage shall be obtained by
action of the Board of Appeals.
30.12.05.05
Contiguous Built Lots
If two (2) or more contiguous lots or parcels are in a single or joint ownership of record
at the time of adoption of this Ordinance, if all or part of the lots do not meet the
dimensional requirements of this Ordinance, and if a principal use or structure exists on
each lot, the non-conforming lots may be conveyed separately or together, provided that
the State Minimum Lot Size Law (12 M.R.S.A. Sections 4807-A through 4807-D) and the
State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two (2) or more principal uses or structures existed on a single lot of record on the
effective date of this ordinance, each may be sold on a separate lot provided that the
above referenced law and rules are complied with. When such lots are divided each lot
thus created must be as conforming as possible to the dimensional requirements of this
Ordinance.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 8 of 50
30.12.05.06
Contiguous Lots
Vacant or Partially Built: If two or more contiguous lots or parcels are in single or joint
ownership of record at the time of or since adoption or amendment of this Ordinance, if
any of these lots do not individually meet the dimensional requirements of this Ordinance
or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the
dimensional requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one of which is
non-conforming, owned by the same person or persons on July 14, 1992 and recorded in
the registry of deeds if the lot is served by a public sewer or can accommodate a
subsurface sewage disposal system in conformance with the State of Maine Subsurface
Wastewater Disposal Rules; and
30.12.05.06.01
Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet
of lot area; or
30.12.05.06.02
Any lots that do not meet the frontage and lot size requirements of Section
30.12.05.06.01 are reconfigured or combined so that each new lot contains at least
100 feet of shore frontage and 20,000 square feet of lot area.
30.13
ESTABLISHMENT OF DISTRICTS
30.13.01
Resource District
The Resource Protection District includes areas in which development would adversely affect
water quality, productive habitat, biological ecosystems, or scenic and natural values. This
district shall include the following areas when they occur within the limits of the shoreland
zone, exclusive of the Stream Protection District, except that areas which are currently
developed and areas which meet the criteria for the Limited Industrial need not be included
within the Resource Protection District.
30.13.01.01
Floodplains along rivers, defined by the 100 year floodplain as designated on the Federal
Emergency Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard
Boundary Maps, or the flood of record, or in the absence of these, by soil types identified
as recent floodplain soils. This district shall also include the 100 year floodplains adjacent
to tidal waters as shown on FEMA Flood Insurance Rate Maps or Flood Hazard Boundary
Maps.
30.13.01.02
Areas of two or more contiguous acres with sustained slopes of 20% or greater.
30.13.01.03
Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a coastal wetland as defined, and which are not surficial connected
to a water body during the period of normal high water.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 9 of 50
30.13.01.04
Land areas along rivers subject to severe bank erosion, undercutting, or riverbed
movement and lands adjacent to tidal waters which are subject to severe erosion or mass
movement, such as steep coastal bluffs.
30.13.02
Stream Protection District
The Stream Protection District includes all land areas within seventy-five (75) feet, horizontal
distance, of the normal high-water line of a stream, exclusive of those areas within two-
hundred and fifty (250) feet, horizontal distance, of the normal high-water line of a river, or
within two hundred and fifty (250) feet, horizontal distance, of the upland edge of a wetland.
Where a stream and its associated shoreland area are located within two-hundred and fifty
(250) feet, horizontal distance, of the above water body or wetland, that land area shall be
regulated under the terms of the shoreland district associated with that water body or
wetland.
30.13.03
Limited Residential
The Limited Residential District includes those areas suitable for residential and recreational
development. It includes areas other than those in the Resource Protection District or Stream
Protection District and includes areas which are used less intensively than those in the Limited
Industrial District.
30.13.04
Limited Industrial
The Limited Industrial District includes the following types of existing, intensively developed
area:
30.13.04.01
Areas of two or more contiguous acres devoted to commercial, industrial or intensive
recreational activities, or a mix of such activities, including but not limited to the following:
30.13.04.01.01
Areas devoted to manufacturing, fabricating or other industrial activities;
30.13.04.01.02
Areas devoted to wholesaling, retail trade and services activities, or other commercial
activities.
30.13.04.01.03
Areas devoted to intensive recreational development and activities, such as, but not
limited to amusement parks, racetracks and fairgrounds.
30.13.04.02
Areas otherwise discernible as having patterns of intensive commercial, industrial or
recreational uses.
Portions of the Limited Industrial District may also include residential uses; however, no
area shall be designated Limited Industrial District based solely on residential uses.
30.14
TABLE OF LAND USES
All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform to
all of the applicable land use standards in Section 30.15. The district designation for a particular
site shall be determined from the Official Shoreland Zoning Map.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 10 of 50
Key to Table 1:
Yes - Allowed (no permit required but use must comply with all applicable land use standards)
No - Prohibited
PB - Allowed with approval by the Planning Board and permit issued by Code Enforcement Officer
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI - Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
SP - Stream Protection
RP - Resource Protection
LR - Limited Residential
LI - Limited Industrial
LAND USES
SP
RP
LR
LI
1.
Non-intensive recreational uses not requiring structures such as hunting,
fishing and hiking
yes
yes
yes
yes
2.
Motorized vehicular traffic on existing roads and trails
no
no
yes
yes
3.
Clearing or removal of vegetation for activities other than timber harvesting CEO CEO
yes
yes
4.
Fire prevention activities
yes
yes
yes
yes
5.
Wildlife management practices
yes
yes
yes
yes
6.
Soil and water conservation practices
yes
yes
yes
yes
7.
Mineral exploration
no
yes² yes²
yes²
8.
Mineral extraction including sand and gravel extraction
no
PB
PB
PB
9.
Surveying and resource analysis
yes
yes
yes
yes
10.
Emergency Operations
yes
yes
yes
yes
11.
Agriculture
yes
PB
yes
yes
12.
Aquaculture
PB
PB
PB
PB
13.
Principal structures and uses
A. One and two family residential, including driveways
PB4
PB9
CEO
CEO
B. Multi-unit residential
no
no
PB
BP
C. Commercial
no10 no10
no
PB
D. Industrial
no
no
no
PB
E. Governmental and institutional
no
no
PB
PB
F. Small non-residential facilities for educational, scientific, or nature
interpretation purposes
PB4
PB
CEO
CEO
G. Structures accessory to allowed uses
PB4
PB
CEO
CEO
14.
Piers, docks, wharfs, bridges and other structures and uses extending over
or below the normal high-water line or within a wetland
A. Temporary
CEO11
CEO11
CEO11
CEO11
B. Permanent
PB
PB
PB
PB
15.
Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
LPI
16.
Home occupations
PB
PB
CEO
CEO
17.
Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
18.
Essential services
A. Roadside distribution lines (34.5kV and lower)
CEO6 CEO6 CEO12 CEO12
B. Non-roadside or cross-country distribution lines involving ten poles or
less in the shoreland zone
PB6
PB6 CEO CEO
C. Non-roadside or cross-country distribution lines involving eleven or
more poles in the shoreland zone
PB6
PB6
PB
PB
D. Other essential services
PB6
PB6
PB
PB
19.
Service drops, as defined, to allowed uses
yes yes
yes
yes
20.
Public and private recreational areas involving minimal structural
development
PB
PB
PB
CEO
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 11 of 50
21.
Individual private campsites
CEO CEO CEO CEO
22.
Campgrounds
no
no7
PB
PB
23.
Road Construction
PB
no8
PB
PB
24.
Parking Facilities
no
no7
PB
PB
25.
Marinas
PB
no
PB
PB
26.
Filling and earth moving of <10 cubic yards
CEO CEO yes
yes
27.
Filling and earth moving of >10 cubic yards
PB
PB
CEO CEO
28.
Signs
yes yes
yes
yes
29.
Uses similar to allowed uses
CEO CEO CEO CEO
30.
Uses similar to uses requiring a CEO permit
CEO CEO CEO CEO
31.
Uses similar to uses requiring a PB permit
PB
PB
PB
PB
2 Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total is disturbed.
4 Provided that a variance from the setback requirement is obtained from the Board of Appeals.
6 See further restrictions in Section 30.15.11.02.
7 Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required form the PB
8 Except as provided in Section 30.15.07.03.
9 Single family residential structures may be allowed by special exception only according to the provisions of Section
30.16.06.
10 Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds that are allowed in the
respective district.
11 Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12 Permit not required but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental
Protection, pursuant to 38 M.R.S.A. Section 480-C, if the activity occurs in, on, over or adjacent to any wetland, great pond,
river, stream or brook and operates in such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to sand dune; or
D.
any construction or alteration of any permanent structure.
30.15
LAND USE STANDARDS
30.15.01
Minimum Lot Standard
Minimum Lot
Minimum
Area (sq. ft.) Shore Frontage (ft.)
Residential per Dwelling Unit
Within the Shoreland Zone Adjacent to Tidal Areas
30,000
150
Within Shoreland Zone Adjacent to Non-Tidal Areas
40,000
200
Governmental, Institutional, Commercial or Industrial per principal structure
Within the Shoreland Zone Adjacent to Tidal Areas
40,000
200
Within Shoreland Zone Adjacent to Non-Tidal Areas
60,000
300
Public and Private Recreational Facilities
Within Shoreland Zone Adjacent to Non-Tidal Areas
40,000
200
30.15.01.01
Land below the normal high-water line of a water body or upland edge of a wetland and
land beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 12 of 50
30.15.01.02
Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on
both sides thereof after September 22, 1971.
30.15.01.03
The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall
be equal to or greater than the shore frontage requirement for a lot with the proposed
use.
30.15.01.04
If more than one (1) residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each
additional dwelling unit, principal structure, or use.
30.15.02
Principal and Accessory Structures
30.15.02.01
All new principal and accessory structures shall be set back at least seventy-five (75) feet,
horizontal distance, from the normal high-water line of water bodies, tributary streams,
or the upland edge of a wetland. In the Resource Protection District the setback
requirement shall be 250 feet, horizontal distance, except for structures, roads, parking
spaces or other regulated objects specifically allowed in that district in which case the
setback requirements specified above shall apply. In addition:
30.15.02.01.01
The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
30.15.02.01.02
On a non-conforming lot of record on which only a residential structure exists, and it
is not possible to place an accessory structure meeting the required water body,
tributary stream or wetland setbacks, the code enforcement officer may issue a permit
to place a single accessory structure, with no utilities, for the storage of yard tools and
similar equipment. Such accessory structure shall not exceed eighty (80) square feet
in area nor eight (8) feet in height and shall be located as far from the shoreline or
tributary stream as practical and shall meet all other applicable standards, including
lot coverage and vegetation clearing limitations. In no case shall the structure be
located closer to the shoreline or tributary stream than the principal structure.
30.15.02.02
Principal or accessory structures and expansions of existing structures which are permitted
in the Resource Protection, Limited Residential and Stream Protection Districts, shall not
exceed thirty-five (35) feet in height. This provision shall not apply to structures such as
transmission towers, windmills, antennas, and similar structures having no floor area.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 13 of 50
30.15.02.03
The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of
record, or in the absence of these, the flood as defined by soil types identified as recent
floodplain soils; except that accessory structures may be placed in accordance with the
standards of the Floodplain Management Ordinance, adopted on March 21, 2009, and
need not meet the elevation requirements of this paragraph.
30.15.02.04
With the exception of, General Development Districts located adjacent to coastal wetlands
and rivers that do not flow to great ponds, and Commercial Fisheries/Maritime Activities,
non-vegetated surfaces shall not exceed a total of twenty (20) percent of the portion of
the lot located within the shoreland zone. This limitation does not apply to public boat
launching facilities regardless of the district in which the facility is located. Industrial
District the footprint shall be limited to 60%.
30.15.02.05
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not
limited to the following: structures, driveways, parking areas, and other areas from which
vegetation has been removed. Naturally occurring ledge and rock outcroppings are not
counted as non-vegetated surfaces when calculating lot coverage for lots of record on
March 24, 1990 in continuous existence since that date.
30.15.02.06
Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
30.15.02.06.01
The site has been previously altered and an effective vegetated buffer does not exist;
30.15.02.06.02
The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland;
30.15.02.06.03
The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized
with vegetative plantings;
30.15.02.06.04
The total height of the wall(s), in the aggregate, are no more than 24 inches;
30.15.02.06.05
Retaining walls are located outside of the 100-year floodplain on rivers, streams,
wetlands, and tributary streams, as designated on the Federal Emergency
Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary
Maps, or the flood of record, or in the absence of these, by soil types identified as
recent floodplain soils.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 14 of 50
30.15.02.06.06
The area behind the wall is re-vegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
30.15.02.06.07
A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland when
a natural buffer area does not exist. The buffer area must meet the following
characteristics:
30.15.02.06.07.01
The buffer must include shrubs and other woody and herbaceous vegetation.
Where natural ground cover is lacking the area must be supplemented with leaf
or bark mulch;
30.15.02.06.07.02
Vegetation plantings must be in quantities sufficient to retard erosion and provide
for effective infiltration of stormwater runoff;
30.15.02.06.07.03
Only native species may be used to establish the buffer area;
30.15.02.06.07.04
A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
30.15.02.06.07.05
A footpath not to exceed the standards in Section 30.15.15.02.01 may traverse
the buffer.
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal
distance, of a water body, tributary stream or wetland, a permit pursuant to the
Natural Resource Protection Act is required from the Department of Environmental
Protection.
30.15.02.06.08
Notwithstanding the requirements stated above, stairways or similar structures may
be allowed with a permit from the Code Enforcement Officer, to provide shoreline
access in areas of steep slopes or unstable soils provided: that the structure is limited
to a maximum of four (4) feet in width; that the structure does not extend below or
over the normal high-water line of a water body or upland edge of a wetland, (unless
permitted by the Department of Environmental Protection pursuant to the Natural
Resources Protection Act, 38 M.R.S.A. section 480-C); and that the applicant
demonstrates that no reasonable access alternative exists on the property.
30.15.03
Piers, Docks, Wharves, Bridges and Other Structures and Uses
Extending Over or Below the Normal High-Water Line of a Water
Body or Within a Wetland and Shoreland Stabilization
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 15 of 50
30.15.03.01
No more than one (1) pier, dock, wharf or similar structure extending or located below
the normal high-water line of a water body or within a wetland is allowed on a single lot;
except that when a single lot contains at least twice the minimum shore frontage as
specified in Section 30.15.01, a second structure may be allowed and remain as long as
the lot is not further divided.
30.15.03.01.01
Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
30.15.03.01.02
The location shall not interfere with existing developed or natural beach areas.
30.15.03.01.03
The facility shall be located so as to minimize adverse effects on fisheries.
30.15.03.01.04
The facility shall be no larger in dimension than necessary to carry on the activity and
be consistent with the surrounding character and uses of the area. A temporary pier,
dock or wharf shall not be wider than six feet for non-commercial uses.
30.15.03.01.05
No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending below the normal high-water line of a water body or within a
wetland unless the structure requires direct access to the water body or wetland as
an operational necessity.
30.15.03.01.06
New permanent piers and docks shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and
a permit has been obtained from the Department of Environmental Protection,
pursuant to the Natural Resources Protection Act.
30.15.03.01.07
No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending below the normal high-water line of a water body or within a wetland shall
be converted to residential dwelling units in any district.
30.15.03.01.08
Except in the Limited Industrial District, structures built on, over or abutting a pier,
wharf, dock or other structure extending below the normal high-water line or within a
wetland shall not exceed twenty (20) feet in height above the pier, wharf, dock or
other structure.
30.15.03.01.09
Vegetation may be removed in excess of the standards in Section 30.15.15 of this
ordinance in order to conduct shoreline stabilization of an eroding shoreline, provided
that a permit is obtained from the Planning Board. Construction equipment must
access the shoreline by barge when feasible as determined by the Planning Board.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 16 of 50
30.15.03.01.09.01
When necessary, the removal of tress and other vegetation to allow for
construction equipment access to the stabilization site via land must be limited to
no more than 12 feet in width. When the stabilization project is complete the
construction equipment access way must be restored.
30.15.03.01.09.02
Revegetation must occur in accordance with Section 30.15.18.
30.15.04
Campgrounds
Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
30.15.04.01
Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and
land below the normal high-water line of a water body shall not be included in calculating
land area per site.
30.15.04.02
The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal
distance, from the normal high-water line of a river, and seventy-five (75) feet, horizontal
distance, from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
30.15.05
Individual Private Campsites
30.15.05.01
Individual private campsites not associated with campgrounds are allowed provided the
following conditions are met:
30.15.05.02
One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
30.15.05.03
When an individual private campsite is proposed on a lot that contains another principal
use and/or structure, the lot must contain the minimum lot dimensional requirements for
the principal structure and/or use, and the individual private campsite separately.
30.15.05.04
Campsite placement on any lot, including the area intended for a recreational vehicle or
tent platform, shall be set back one hundred (100) feet, horizontal distance, from the
normal high-water line of a river, and seventy-five (75) feet, horizontal distance, from the
normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 17 of 50
30.15.05.05
Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no
structure except a canopy shall be attached to the recreational vehicle.
30.15.05.06
The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter
in a Resource Protection District shall be limited to one thousand (1000) square feet.
30.15.05.07
A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or
land owner is required.
30.15.05.08
When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall
be met, including the installation of a subsurface sewage disposal system in compliance
with the State of Maine Subsurface Wastewater Disposal Rules unless served by public
sewage facilities.
30.15.06
Parking Areas
30.15.06.01
Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities in Districts other than the Limited
Industrial District shall be no less than fifty (50) feet, horizontal distance, from the
shoreline or tributary stream if the Planning Board finds that no other reasonable
alternative exists further from the shoreline or tributary stream.
30.15.06.02
Parking areas shall be adequately sized for the proposed use and shall be designed to
prevent stormwater runoff from flowing directly into a water body, tributary stream or
wetland and where feasible, to retain all runoff on-site.
30.15.06.03
In determining the appropriate size of proposed parking facilities, the following shall apply:
30.15.06.03.01
Typical Parking Space
Approximately ten (10) feet wide and twenty (20) feet long, except that parking spaces
for a vehicle and boat trailer shall be forty (40) feet long, and parking for tractors
towing semi-trailers shall be at least seventy-five (75) feet long.
30.15.06.03.02
Internal Travel Aisles
Approximately twenty (20) feet wide.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 18 of 50
30.15.07
Roads and Driveways
The following standards shall apply to the construction of roads and/or driveways and
drainage systems, culverts and other related features.
30.15.07.01
Roads and driveways shall be set back at least seventy-five (75) feet, horizontal distance
from the normal high-water line of water bodies, tributary streams, or the upland edge of
a wetland unless no reasonable alternative exists as determined by the Planning Board.
If no other reasonable alternative exists, the road and/or driveway setback requirement
shall be no less than fifty (50) feet, horizontal distance, upon clear showing by the
applicant that appropriate techniques will be used to prevent sedimentation of the water
body, tributary stream, or wetland. Such techniques may include, but are not limited to,
the installation of settling basins, and/or the effective use of additional ditch relief culverts
and turnouts placed so as to avoid sedimentation of the water body, tributary stream, or
wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 30.15.07.01 does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures and facilities located nearer to the
shoreline or tributary stream due to an operational necessity, excluding temporary docks
for recreational uses. Roads and driveways providing access to permitted structures within
the setback area shall comply fully with the requirements of Section 30.15.07.01 except
for that portion of the road or driveway necessary for direct access to the structure.
30.15.07.02
Existing public roads may be expanded within the legal road right of way regardless of
their setback from a water body, tributary stream or wetland.
New permanent roads are not allowed within the shoreland zone along Significant River
Segments except:
30.15.07.02.01
To provide access to structures or facilities within the zone; or
30.15.07.02.02
When the applicant demonstrates that no reasonable alternative route exists outside
the shoreland zone. When roads must be located within the shoreland zone they shall
be set back as far as practicable from the normal high-water line and screened from
the river by existing vegetation.
30.15.07.03
New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the
Planning Board in a Resource Protection District, upon a finding that no reasonable
alternative route or location is available outside the district.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 19 of 50
When a road or driveway is permitted in a Resource Protection District the road and/or
driveway shall be set back as far as practicable from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland.
30.15.07.04
Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one
(1) vertical, and shall be graded and stabilized in accordance with the provisions for
erosion and sedimentation control contained in Section 30.15.19.
30.15.07.05
Road and driveway grades shall be no greater than ten (10) percent except for segments
of less than two hundred (200) feet.
30.15.07.06
In order to prevent road and driveway surface drainage from directly entering water
bodies, tributary streams or wetlands, roads and driveways shall be designed, constructed,
and maintained to empty onto an unscarified buffer strip at least (50) feet plus two times
the average slope, in width between the outflow point of the ditch or culvert and the
normal high-water line of a water body, tributary stream, or upland edge of a wetland.
Surface drainage which is directed to an unscarified buffer strip shall be diffused or spread
out to promote infiltration of the runoff and to minimize channelized flow of the drainage
through the buffer strip.
Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed
in a manner effective in directing drainage onto unscarified buffer strips before the flow
gains sufficient volume or head to erode the road, driveway, or ditch. To accomplish this,
the following shall apply:
30.15.07.07
Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis
to assure effective functioning.
30.15.07.07.01
Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road or driveway at intervals no greater than indicated in the following table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21
40
30.15.07.07.02
Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 20 of 50
30.15.07.07.03
On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line
perpendicular to the centerline of the road or driveway.
30.15.07.07.04
Ditch relief culverts shall be sufficiently sized and properly installed in order to allow
for effective functioning and their inlet and outlet ends shall be stabilized with
appropriate materials.
30.15.08
Signs
The following provisions shall govern the use of signs in the Resource Protection, Stream
Protection, and Limited Residential Districts:
30.15.08.01
Signs relating to goods and services sold on the premises shall be allowed, provided that
such signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs
per premises. Signs relating to goods or services not sold or rendered on the premises
shall be prohibited.
30.15.08.02
Name signs are allowed, provided such signs shall not exceed two (2) signs per premises,
and shall not exceed twelve (12) square feet in the aggregate.
30.15.08.03
Residential users may display a single sign not over three (3) square feet in area relating
to the sale, rental, or lease of the premises.
30.15.08.04
Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
30.15.08.05
Signs relating to public safety shall be allowed without restriction.
30.15.08.06
No sign shall extend higher than twenty (20) feet above the ground.
30.15.08.07
Signs may be illuminated only by shielded, non-flashing lights.
30.15.09
Storm Water Runoff
All new construction and development shall be designed to minimize storm water runoff from
the site in excess of the natural predevelopment conditions. Where possible, existing natural
runoff control features, such as berms, swales, terraces and wooded areas, shall be retained
in order to reduce runoff and encourage infiltration of stormwaters.
Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 21 of 50
30.15.10
Septic Waste Disposal
All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following.
30.15.10.01
Clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet, horizontal
distance, from the normal high-water line of a water body or the upland edge of a wetland
and
30.15.10.02
A holding tank is not allowed for a first-time residential use in the shoreland zone.
30.15.11
Essential Services
30.15.11.01
Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
30.15.11.02
The installation of essential services, other than road-side distribution lines, is not allowed
in a Resource Protection or Stream Protection District, except to provide services to a
permitted use within said district, or except where the applicant demonstrates that no
reasonable alternative exists. Where allowed, such structures and facilities shall be located
so as to minimize any adverse impacts on surrounding uses and resources, including visual
impacts.
30.15.11.03
Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
30.15.12
Mineral Exploration and Extraction
Mineral exploration to determine the nature or extent of mineral resources shall be
accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from the
Code Enforcement Officer shall be required for mineral exploration which exceeds the above
limitation. All excavations, including test pits and holes, shall be immediately capped, filled or
secured by other equally effective measures to restore disturbed areas and to protect the
public health and safety.
Mineral extraction may be permitted under the following conditions:
30.15.12.01
A reclamation plan shall be filed with, and approved, by the Planning Board before a
permit is granted. Such plan shall describe in detail procedures to be undertaken to fulfill
the requirements of Section 30.15.12.03 below.
30.15.12.02
No part of any extraction operation, including drainage and runoff control features, shall
be permitted within seventy-five (75) feet, horizontal distance, of the normal high-water
line of any water body, tributary stream, or the upland edge of a wetland.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 22 of 50
Extraction operations shall not be permitted within fifty (50) feet, horizontal distance, of
any property line without written permission of the owner of such adjacent property.
30.15.12.03
Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred
(100) cubic yards of materials are removed in any consecutive twelve (12) month period,
ground levels and grades shall be established in accordance with the following:
30.15.12.03.01
All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
30.15.12.03.02
The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
30.15.12.03.03
Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization
project.
30.15.12.04
In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
30.15.13
Agriculture
30.15.13.01
All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the former Maine Department of Agriculture on November 1,
2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
30.15.13.02
Manure shall not be stored or stockpiled within seventy-five (75) feet horizontal distance,
of water bodies, tributary streams, or wetlands. All manure storage areas within the
shoreland zone must be constructed or modified such that the facility produces no
discharge of effluent or contaminated storm water.
30.15.13.03
Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be
filed with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 23 of 50
30.15.13.04
There shall be no new tilling of soil within seventy-five (75) feet, horizontal distance, from
water bodies and coastal wetlands, nor within twenty-five (25) feet, horizontal distance,
of tributary streams. Operations in existence on the effective date of this ordinance and
not in conformance with this provision may be maintained.
30.15.13.05
Newly established livestock grazing areas shall not be permitted within seventy-five (75)
feet, horizontal distance, of water bodies and coastal wetlands, nor within twenty-five (25)
feet, horizontal distance, of tributary streams. Livestock grazing associated with ongoing
farm activities, and which are not in conformance with the above setback provisions may
continue, provided that such grazing is conducted in accordance with a Conservation Plan
that has been filed with the Planning Board.
30.15.14
Timber Harvesting
Repealed: Bureau of Forestry will administer the regulation of all forestry activities within the
municipality.
30.15.15
Clearing or Removal of Vegetation for Activities other than Timber
Harvesting
30.15.15.01
In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending 75 feet, horizontal distance, and inland from
the normal high-water line, except to remove hazard trees as described in section Q.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall
be limited to that which is necessary for uses expressly authorized in that district.
30.15.15.02
Except in areas as described in Section 30.15.15.01, above, within a strip of land extending
seventy-five (75) feet, horizontal distance, from any water body, tributary stream, or the
upland edge of a wetland, a buffer strip of vegetation shall be preserved as follows:
30.15.15.02.01
There shall be no cleared opening greater than 250 square feet in the forest canopy
(or other existing woody vegetation if a forested canopy is not present) as measured
from the outer limits of the tree or shrub crown. However, a single footpath not to
exceed six (6) feet in width as measured between tree trunks and/or shrub stems is
allowed for accessing the shoreline provided that a cleared line of sight to the water
through the buffer strip is not created.
30.15.15.02.02
Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes
of Section 30.15.15.02.02.02 a "well-distributed stand of trees" shall be defined as
maintaining a rating score of 16 or more in each 25-foot by 50-foot rectangular (1250
square feet) area as determined by the following rating system.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 24 of 50
Diameter of Tree at 4-1/2 feet Above Points
Ground Level (inches)
2 < 4 in.
1
4 < 8 in.
2
8 < 12 in.
4
12 in. or greater
8
The following shall govern in applying this point system:
30.15.15.02.02.01
The 25-foot by 50-foot rectangular plots must be established where the landowner
or lessee proposes clearing within the required buffer;
30.15.15.02.02.02
Each successive plot must be adjacent to, but not overlap a previous plot;
30.15.15.02.02.03
Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
30.15.15.02.02.04
Any plot containing the required points may have vegetation removed down to the
minimum points required or as otherwise allowed by is Ordinance;
30.15.15.02.02.05
Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 30.15.15.02.01 "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not exist,
no woody stems less than two (2) inches in diameter can be removed until 5 saplings have
been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four
(4) inches or more in diameter, measured at 4 1/2 feet above ground level may be removed
in any ten (10) year period.
30.15.15.02.03
In order to protect water quality and wildlife habitat, existing vegetation under three
(3) feet in height and other ground cover, including leaf litter and the forest duff layer,
shall not be cut, covered, or removed, except to provide for a footpath or other
permitted uses as described in Section 30.15.15.02 and 30.15.15.02.01, above.
30.15.15.02.04
Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 25 of 50
30.15.15.02.05
In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
dead or hazard trees results in the creation of cleared openings, these openings shall
be replanted with native tree species in accordance with Section 30.15.19, below
unless existing new tree growth is present.
30.15.15.02.06
In order to maintain the vegetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related
equipment operation, within or outside the shoreline buffer, must comply with the
requirements of Section 30.15.15.02.
30.15.15.02.07
At distances greater than seventy-five (75) feet, horizontal distance, from the normal
high-water line of any water body, tributary stream, or the upland edge of a wetland,
there shall be allowed on any lot, in any ten (10) year period, selective cutting of not
more than forty (40) percent of the volume of trees four (4) inches or more in
diameter, measured 4 1/2 feet above ground level.
Tree removal in conjunction with the development of permitted uses shall be included
in the forty (40) percent calculation. For the purposes of these standards volume may
be considered to be equivalent to basal area.
30.15.15.02.08
In no event shall cleared openings for any purpose, including but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed in the aggregate, 25% of the lot area within the shoreland zone or ten
thousand (10,000) square feet, whichever is greater, including land previously cleared.
This provision applies to the portion of a lot within the shoreland, including the buffer
area, but shall not apply to the Limited Industrial District.
30.15.15.02.09
Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
30.15.15.02.10
Fields and other cleared openings which have reverted to primarily shrubs, trees, or
other woody vegetation shall be regulated under the provisions of Section 30.15.15.
30.15.16
Hazard Trees, Storm Damaged Trees and Dead Tree Removal
30.15.16.01
Hazard trees in the shoreland zone may be removed without a permit after consultation
with the Code Enforcement Officer if the following requirements are met:
30.15.16.01.01
Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening
in the tree canopy greater than two hundred and fifty (250) square feet, replacement
with native tree species is required, unless there is new tree growth already present.
New tree growth must be as near as practicable to where the hazard tree was removed
and be at least two (2) inches in diameter, measured at four and one half (4.5) feet
above the ground level.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 26 of 50
If new growth is not present, then replacement trees shall consist of native species
and be at least four (4) feet in height, and be no less than two (2) inches in diameter.
Stumps may not be removed.
30.15.16.01.02
Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four
and one half (4.5) feet above ground level in any ten (10) year period, and/or results
in cleared openings exceeding twenty-five (25) percent of the lot area within the
shoreland zone, or ten thousand (10,000) square feet, whichever is greater,
replacement with native tree species is required, unless there is new tree growth
already present.
New tree growth must be as near as practicable to where the hazard tree was removed
and be at least two (2) inches in diameter, measured at four and one half (4.5) feet
above the ground level. If new growth is not present, then replacement trees shall
consist of native species and be at least two (2) inches in diameter, measured at four
and one half (4.5) feet above the ground level.
30.15.16.01.03
The removal of standing dead trees, resulting from natural causes, is permissible
without the need for replanting or a permit, as long as the removal does not result in
the creation of new lawn areas, or other permanently cleared areas, and stumps are
not removed. For the purposes of this provision dead trees are those trees that contain
no foliage during the growing season.
30.15.16.01.04
The Code Enforcement Officer may require the property owner to submit an evaluation
from a licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
30.15.16.01.05
The Code Enforcement Officer may require more than a one-for-one replacement for
hazard trees removed that exceed eight (8) inches in diameter measured at four and
one half (4.5) feet above the ground level.
30.15.16.02
Storm-damaged trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met.
30.15.16.02.01
Within the shoreline buffer, when the removal of storm-damaged trees results in a
cleared opening in the tree canopy greater than two hundred and fifty (250) square
feet, replanting is not required, but the area shall be required to naturally revegetate,
and the following requirements must be met:
30.15.16.02.01.01
The area from which a storm-damaged tree is removed does not result in new
lawn areas, or other permanently cleared areas;
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 27 of 50
30.15.16.02.01.02
Stumps from the storm-damaged trees may not be removed;
30.15.16.02.01.03
Limbs damaged from a storm event may be pruned even if they extend beyond
the bottom one-third (1/3) of the tree; and
30.15.16.02.01.04
If after one growing season, no natural regeneration or regrowth is present,
replanting of native tree seedlings or saplings is required at a density of one
seedling per every eighty (80) square feet of lost canopy.
30.15.16.02.02
Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40%
of the volume of trees four (4) inches or more in diameter, measured at four and one
half (4.5) feet above the ground level in any ten (10) year period, or results, in the
aggregate, in cleared openings exceeding 25% of the lot area within the shoreland
zone or ten thousand (10,000) square feet, whichever is greater, and no natural
regeneration occurs within one growing season, then native tree seedlings or saplings
shall be replanted on a one-for-one basis.
30.15.17
Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set
forth in Section 30.15.15, provided that all other applicable requirements of this chapter are
complied with, and the removal of vegetation is limited to that which is necessary:
30.15.17.01
The removal of vegetation that occurs at least once every two (2) years for the
maintenance of legally existing areas that do not comply with the vegetation standards in
this chapter, such as but not limited to cleared openings in the canopy or fields. Such
areas shall not be enlarged, except as allowed by this section. If any of these areas, due
to lack of removal of vegetation every two (2) years, reverts back to primarily woody
vegetation, the requirements of Section 30.15.15 apply;
30.15.17.02
The removal of vegetation from the location of allowed structures or allowed uses, when
the shoreline setback requirements of Section 30.15.02 are not applicable;
30.15.17.03
The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
30.15.17.04
The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of Section 30.15.13 are
complied with;
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 28 of 50
30.15.17.05
The removal of vegetation associated with brownfields or voluntary response action
program (VRAP) projects provided that the removal of vegetation is necessary for
remediation activities to clean-up contamination on a site in a general development
district, commercial fisheries and maritime activities district or other equivalent zoning
district approved by the Commissioner that is part of a state or federal brownfields
program or a voluntary response action program pursuant 38 M.R.S.A section 343-E, and
that is located along:
30.15.17.05.01
A coastal wetland; or
30.15.17.05.02
A river that does not flow to a great pond classified as GPA pursuant to 38 M.R.S.A
section 465-A.
30.15.17.06
The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
30.15.17.06.01
If removal of vegetation occurs via wheeled or tracked motorized equipment, the
wheeled or tracked motorized equipment is operated and stored at least twenty-five
(25) feet, horizontal distance, from the shoreline, except that wheeled or tracked
equipment may be operated or stored on existing structural surfaces, such as
pavement or gravel;
30.15.17.06.02
Removal of vegetation within twenty-five (25) feet, horizontal distance, from the
shoreline occurs via hand tools; and
30.15.17.06.03
If applicable clearing and vegetation removal standards are exceeded due to the
removal of non-native invasive species vegetation, the area shall be revegetated with
native species to achieve compliance.
30.15.17.07
The removal of vegetation associated with emergency response activities conducted by
the Department, the U.S. Environmental Protection Agency, the U.S. Coast Guard, and
their agents.
30.15.18
Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth
in Section 30.15.15, to address the removal of non-native invasive species of vegetation, or
as a mechanism to allow for development that may otherwise not be permissible due to the
vegetation standards, including removal of vegetation in conjunction with a shoreline
stabilization project, the revegetation must comply with the following requirements.
30.15.18.01
The property owner must submit a revegetation plan, prepared with and signed by a
qualified professional that describes revegetation activities and maintenance.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 29 of 50
The plan must include a scaled site plan, depicting where vegetation was, or is to be
removed, where existing vegetation is to remain, and where vegetation is to be planted,
including a list of all vegetation to be planted.
30.15.18.02
Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed and at a density comparable to the pre-existing vegetation,
except where a shoreline stabilization activity does not allow revegetation to occur in the
same area and at a density comparable to the pre-existing vegetation, in which case
revegetation must occur along the same segment of shoreline and as close as possible to
the area where vegetation was removed.
30.15.18.03
If part of a permitted activity, revegetation shall occur before the expiration of the permit.
If the activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
30.15.18.04
Revegetation activities must meet the following requirements for trees and saplings:
30.15.18.04.01
All trees and saplings removed must be replaced with native noninvasive species;
30.15.18.04.02
Replacement vegetation must at a minimum consist of saplings;
30.15.18.04.03
If more than three (3) trees or saplings are planted, then at least three (3) different
species shall be used;
30.15.18.04.04
No one species shall make up 50% or more of the number of trees and saplings
planted;
30.15.18.04.05
If revegetation is required for a shoreline stabilization project, and it is not possible to
plant trees and saplings in the same area where trees or saplings were removed, then
trees or sapling must be planted in a location that effectively reestablishes the
screening between the shoreline and structures; and
30.15.18.04.06
A survival rate of at least eighty (80) percent of planted trees or saplings is required
for a minimum five (5) years period.
30.15.18.05
Revegetation activities must meet the following requirements for woody vegetation and
other vegetation under three (3) feet in height:
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 30 of 50
30.15.18.05.01
All woody vegetation and vegetation under three (3) feet in height must be replaced
with native noninvasive species of woody vegetation and vegetation under three (3)
feet in height as applicable;
30.15.18.05.02
Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantities and variety sufficient to prevent erosion and provide for effective infiltration
of stormwater;
30.15.18.05.03
If more than three (3) woody vegetation plants are to be planted, then at least three
different species shall be planted;
30.15.18.05.04
No one species shall make up 50% or more of the number of planted woody vegetation
plants; and
30.15.18.05.05
Survival of planted woody vegetation and vegetation under three feet in height must
be sufficient to remain in compliance with the standards contained within this chapter
for minimum of five (5) years.
30.15.18.06
Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
30.15.18.06.01
All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and
provide for effective infiltration of stormwater;
30.15.18.06.02
Where necessary due to a lack of sufficient ground cover, an area must be
supplemented with a minimum four (4) inch depth of leaf mulch and/or bark mulch to
prevent erosion and provide for effective infiltration of stormwater; and
30.15.18.06.03
Survival and functionality of ground vegetation and ground cover must be sufficient
to remain in compliance with the standards contained within this chapter for minimum
of five (5) years.
30.15.19
Erosion and Sedimentation Control
30.15.19.01
All activities which involve filling, grading, excavation or other similar activities which result
in un-stabilized soil conditions and which require a permit shall also require a written soil
erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 31 of 50
30.15.19.01.01
Mulching and re-vegetation of disturbed soil.
30.15.19.01.02
Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
30.15.19.01.03
Permanent stabilization structures such as retaining walls or riprap.
30.15.19.02
In order to create the least potential for erosion, development shall be designed to fit with
the topography and soils of the site. Areas of steep slopes where high cuts and fills may
be required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
30.15.19.03
Erosion and sedimentation control measures shall apply to all aspects of the proposed
project involving land disturbance and shall be in operation during all stages of the activity.
The amount of exposed soil at every phase of construction shall be minimized to reduce
the potential for erosion.
30.15.19.04
Any exposed ground area shall be temporarily or permanently stabilized within one (1)
week from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or
other effective measures. In all cases permanent stabilization shall occur within nine (9)
months of the initial date of exposure. In addition:
30.15.19.04.01
Where mulch is used, it shall be applied at a rate of at least one (1) bale per five
hundred (500) square feet and shall be maintained until a catch of vegetation is
established.
30.15.19.04.02
Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
30.15.19.04.03
Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
30.15.19.05
Natural and man-made drainage ways and drainage outlets shall be protected from
erosion from water flowing through them. Drainage-ways shall be designed and
constructed in order to carry water from a twenty-five (25) year storm or greater, and
shall be stabilized with vegetation or lined with riprap.
30.15.19.06
When an excavation contractor will perform the activities, compliance with the following
shall be required:
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 32 of 50
30.15.19.06.01
A person certified in erosion control practices by the Maine Department of
Environmental Protection shall be responsible for management of erosion and
sedimentation control practices at the site. This person shall be present at the site
each day earthmoving activity occurs for a duration that is sufficient to ensure that
proper erosion and sedimentation control practices are followed. This is required until
erosion and sedimentation control measures have been installed, which will either stay
in place permanently or stay in place until the area is sufficiently covered with
vegetation necessary to prevent soil erosion.
30.15.19.06.02
The name and certification number of the person who will oversee activities causing
or resulting in soil disturbance shall be required on the plan or permit application.
30.15.20
Soils
All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including
severe erosion, mass soil movement, improper drainage, and water pollution, whether during
or after construction. Proposed uses requiring subsurface waste disposal, and commercial or
industrial development and other similar intensive land uses, shall require a soils report based
on an on-site investigation and be prepared by state-certified professionals. Certified persons
may include Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine
State Certified Geologists and other persons who have training and experience in the
recognition and evaluation of soil properties. The report shall be based upon the analysis of
the characteristics of the soil and surrounding land and water areas, maximum ground water
elevation, and presence of ledge, drainage conditions, and other pertinent data which the
evaluator deems appropriate. The soils report shall include recommendations for a proposed
use to counteract soil limitations where they exist.
30.15.21
Water Quality
No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair
designated uses or the water classification of the water body, tributary stream or wetland.
30.15.22
Archaeological Sites
Any proposed land use activity involving structural development or soil disturbance on or
adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places,
as determined by the permitting authority, shall be submitted by the applicant to the Maine
Historic Preservation Commission for review and comment, at least twenty (20) days prior to
action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
30.16
ADMINISTRATION
30.16.01
Administrative Bodies
30.16.01.01
Code Enforcement Officer
A Code Enforcement Officer shall be appointed or reappointed annually by July 1st.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 33 of 50
30.16.01.02
Board of Appeals
A Board of Appeals shall be created in accordance with the provisions of 30-A M.R.S.A.
section 2691.
30.16.01.03
Planning Board
A Planning Board shall be created in accordance with the provisions of State law.
30.16.02
Permits Required
After the effective date of this Ordinance no person shall, without first obtaining a permit,
engage in any activity or use of land or structure requiring a permit in the district in which
such activity or use would occur; or expand, change, or replace an existing use or structure;
or renew a discontinued nonconforming use. A person who is issued a permit pursuant to this
Ordinance shall have a copy of the permit on site while the work authorized by the permit is
performed.
30.16.02.01
A permit is not required for the replacement of an existing road culvert as long as:
30.16.02.01.01
The replacement culvert is not more than 25% longer than the culvert being replaced;
30.16.02.01.02
The replacement culvert is no longer than 75 feet; and
30.16.02.01.03
Adequate erosion control measures are taken to prevent sedimentation of the water,
and the crossing does not block fish passage in the watercourse.
30.16.02.02
A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means
of adequate and timely temporary and permanent stabilization measures.
30.16.02.03
Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
30.16.03
Permit Application
30.16.03.01
Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section
30.14.
30.16.03.02
All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that
the information in the application is complete and correct.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 34 of 50
30.16.03.03
All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
30.16.03.04
If the property is not served by a public sewer, a valid plumbing permit or a completed
application for a plumbing permit, including the site evaluation approved by the Plumbing
Inspector, shall be submitted whenever the nature of the proposed structure or use would
require the installation of a subsurface sewage disposal system.
30.16.03.05
When an excavation contractor will perform an activity that requires or results in more
than one (1) cubic yard of soil disturbance, the person responsible for management of
erosion and sedimentation control practices at the site must be certified in erosion control
practices by the Maine Department of Environmental Protection.
This person must be present at the site each day earthmoving activity occurs for a duration
that is sufficient to ensure that proper erosion and sedimentation control practices are
followed. This is required until erosion and sedimentation control measures have been
installed, which will either stay in place permanently or stay in place until the area is
sufficiently covered with vegetation necessary to prevent soil erosion. The name and
certification number of the person who will oversee the activity causing or resulting in soil
disturbance shall be included on the permit application. This requirement does not apply
to a person or firm engaged in agriculture or timber harvesting if best management
practices for erosion and sedimentation control are used; and municipal, state and federal
employees engaged in projects associated with that employment.
30.16.04
Fee Schedule
The application for a permit shall be accompanied by an application fee in such amount as
the Municipal Officers may by rule from time to time establish.
30.16.05
Procedure for Administering Permits
Within 35 days of the date of receiving a written application, the Planning Board or Code
Enforcement Officer, as indicated in Section 30.14, shall notify the applicant in writing either
that the application is a complete application, or, if the application is incomplete, that specified
additional material is needed to make the application complete. The Planning Board or the
Code Enforcement Officer, as appropriate, shall approve, approve with conditions, or deny all
permit applications in writing within 35 days of receiving a completed application. However,
if the Planning Board has a waiting list of applications, a decision on the application shall occur
within 35 days after the first available date on the Planning Board's agenda following receipt
of the completed application, or within 35 days of the public hearing if the proposed use or
structure is found to be in conformance with the purposes and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve
an application or approve it with conditions if it makes a positive finding based on the
information presented that the proposed use:
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 35 of 50
30.16.05.01
Will maintain safe and healthful conditions;
30.16.05.02
Will not result in water pollution, erosion, or sedimentation to surface waters;
30.16.05.03
Will adequately provide for the disposal of all wastewater;
30.16.05.04
Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
30.16.05.05
Will conserve shore cover and visual, as well as actual, points of access to waters;
30.16.05.06
Will protect archaeological and historic resources as designated in the comprehensive
plan;
30.16.05.07
Will avoid problems associated with floodplain development and use; and
30.16.05.08
Is in conformance with the provisions of Section 30.15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions
shall be stated in writing. No approval shall be granted for an application involving a structure
if the structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
30.16.06
Special Exceptions
In addition to the criteria specified in Section 30.16.05 above, excepting structure setback
requirements, the Planning Board may approve a permit for a single family residential
structure in a Resource Protection District provided that the applicant demonstrates that all
of the following conditions are met:
30.16.06.01
There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
30.16.06.02
The lot on which the structure is proposed is undeveloped and was established and
recorded in the registry of deeds of the county in which the lot is located before the
adoption of the Resource Protection District.
30.16.06.03
All proposed buildings, sewage disposal systems and other improvements are:
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 36 of 50
30.16.06.03.01
Located on natural ground slopes of less than 20%; and
30.16.06.03.02
Located outside the floodway of the 100-year floodplain along rivers, based on detailed
flood insurance studies and as delineated on the Federal Emergency Management
Agency's Flood Boundary and Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at least one foot above the 100-year
floodplain elevation; and the development is otherwise in compliance with any
applicable municipal floodplain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it
is deemed to be 1/2 the width of the 100-year floodplain.
30.16.06.04
The total footprint, including cantilevered or similar overhanging extensions, of all principal
and accessory structures is limited to a maximum of 1,500 square feet. This limitation
shall not be altered by variance.
30.16.06.05
All structures, except functionally water-dependent structures, are set back from the
normal high-water line of a water body, tributary stream or upland edge of a wetland to
the greatest practical extent, but not less than 75 feet, horizontal distance. In determining
the greatest practical extent, the Planning Board shall consider the depth of the lot, the
slope of the land, the potential for soil erosion, the type and amount of vegetation to be
removed, the proposed building site's elevation in regard to the floodplain, and its
proximity to moderate-value and high-value wetlands.
30.16.07
Expiration of Permit
Permits shall expire one year from the date of issuance if a substantial start is not made in
construction or in the use of the property during that period. If a substantial start is made
within one year of the issuance of the permit, the applicant shall have one additional year to
complete the project, at which time the permit shall expire, unless a permit renewal is granted.
A permit renewal may only be granted after a substantial start is made and within one year
of when the substantial start was made. If a permit renewal is granted, the applicant shall
have one year from the issuance of the renewal to complete the project, at which time the
permit shall expire.
30.16.08
Installation of Public Utility Service
A public utility, water district, sanitary district or any utility company of any kind may not
install services to any new structure located in the shoreland zone unless written authorization
attesting to the validity and currency of all local permits required under this or any previous
Ordinance has been issued by the appropriate municipal officials or other written
arrangements have been made between the municipal officials and the utility.
30.16.09
Appeals
30.16.09.01
Powers and Duties of the Board of Appeals
The Board of Appeals shall have the following powers:
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 37 of 50
30.16.09.01.01
Administrative Appeals
To hear and decide administrative appeals, on an appellate basis, where it is alleged
by an aggrieved party that there is an error in any order, requirement, decision, or
determination made by, or failure to act by, the Planning Board in the administration
of this Ordinance; and to hear and decide administrative appeals on a de novo basis
where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code
Enforcement Officer in his or her review of and action on a permit application under
this Ordinance. Any order, requirement, decision or determination made, or failure to
act, in the enforcement of this ordinance is not appealable to the Board of Appeals.
30.16.09.01.02
Variance Appeals
To authorize variances upon appeal, within the limitations set forth in this Ordinance.
30.16.09.02
Variance Appeals
Variances may be granted only under the following conditions:
30.16.09.02.01
Variances may be granted only from dimensional requirements including, but not
limited to, lot width, structure height, percent of lot coverage, and setback
requirements.
30.16.09.02.02
Variances shall not be granted for establishment of any uses otherwise prohibited by
this Ordinance.
30.16.09.02.03
The Board shall not grant a variance unless it finds that:
30.16.09.02.03.01
The proposed structure or use would meet the provisions of Section 15 except for
the specific provision which has created the non-conformity and from which relief
is sought; and
30.16.09.02.03.02
The strict application of the terms of this Ordinance would result in undue
hardship. The term "undue hardship" shall mean:
30.16.09.02.03.02.01
That the land in question cannot yield a reasonable return unless a variance
is granted;
30.16.09.02.03.02.02
That the need for a variance is due to the unique circumstances of the property
and not to the general conditions in the neighborhood;
30.16.09.02.03.02.03
That the granting of a variance will not alter the essential character of the
locality; and
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 38 of 50
30.16.09.02.03.02.04
That the hardship is not the result of action taken by the applicant or a prior
owner.
30.16.09.02.04
Notwithstanding Section 30.16.09.01.02 above, the Board of Appeals may grant a
variance to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the dwelling.
The board shall restrict any variance granted under this subsection solely to the
installation of equipment or the construction of structures necessary for access to or
egress from the dwelling by the person with the disability. The board may impose
conditions on the variance, including limiting the variance to the duration of the
disability or to the time that the person with the disability lives in the dwelling. The
term "structures necessary for access to or egress from the dwelling" shall include
railing, wall or roof systems necessary for the safety or effectiveness of the structure.
Any permit issued pursuant to this subsection is subject to Sections 30.16.09.02.06
and 30.16.09.04.02.04 below.
30.16.09.02.05
The Board of Appeals shall limit any variances granted as strictly as possible in order
to ensure conformance with the purposes and provisions of this Ordinance to the
greatest extent possible, and in doing so may impose such conditions to a variance as
it deems necessary. The party receiving the variance shall comply with any conditions
imposed.
30.16.09.02.06
A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the municipal officials to
the Commissioner of the Department of Environmental Protection at least twenty (20)
days prior to action by the Board of Appeals. Any comments received from the
Commissioner prior to the action by the Board of Appeals shall be made part of the
record and shall be taken into consideration by the Board of Appeals.
30.16.09.03
Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board
of Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider
new evidence and testimony, be it oral or written. When acting in a "de novo" capacity
the Board of Appeals shall hear and decide the matter afresh, undertaking its own
independent analysis of evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an
appellate hearing, and may reverse the decision of the Planning Board only upon finding
that the decision was contrary to specific provisions of the Ordinance or contrary to the
facts presented to the Planning Board. The Board of Appeals may only review the record
of the proceedings before the Planning Board. The Board of Appeals shall not receive or
consider any evidence which was not presented to the Planning Board, but the Board of
Appeals may receive and consider written or oral arguments. If the Board of Appeals
determines that the record of the Planning Board proceedings are inadequate, the Board
of Appeals may remand the matter to the Planning Board for additional fact finding.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 39 of 50
30.16.09.04
Appeal Procedure
30.16.09.04.01
Making an Appeal
30.16.09.04.01.01
An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section
30.16.09.01.01 above. Such an appeal shall be taken within thirty (30) days of the
date of the official, written decision appealed from, and not otherwise, except that
the Board, upon a showing of good cause, may waive the thirty (30) day
requirement.
30.16.09.04.01.02
Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
30.16.09.04.01.02.01
A concise written statement indicating what relief is requested and why the
appeal or variance should be granted.
30.16.09.04.01.02.02
A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
30.16.09.04.01.03
Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board
of Appeals all of the papers constituting the record of the decision appealed from.
30.16.09.04.01.04
The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete
written application unless this time period is extended by the parties.
30.16.09.04.02
Decision by Board of Appeals
30.16.09.04.02.01
A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
30.16.09.04.02.02
The person filing the appeal shall have the burden of proof.
30.16.09.04.02.03
The Board shall decide all administrative appeals and variance appeals within thirty
five (35) days after the close of the hearing, and shall issue a written decision on
all appeals.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 40 of 50
30.16.09.04.02.04
The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7) days
of the Board's decision. Copies of written decisions of the Board of Appeals shall
be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
30.16.09.04.03
Appeals to Superior Court
Except as provided by 30-A M.R.S.A. Section 2691(3)(F), any aggrieved party who
participated as a party during the proceedings before the Board of Appeals may take
an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
30.16.09.04.04
Reconsideration
In accordance with 30-A M.R.S.A. Section 2691(3)(F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision.
A request to the Board to reconsider a decision must be filed within ten (10) days of
the decision that is being reconsidered.
A vote to reconsider and the action taken on that reconsideration must occur and be
completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner,
petitioner, planning board, code enforcement officer, and other parties of interest,
including abutters and those who testified at the original hearing(s). The Board may
conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15)
days after the decision on reconsideration.
30.16.10
Enforcement
30.16.10.01
Nuisance
Any violation of this Ordinance shall be deemed to be a nuisance.
30.16.10.02
Code Enforcement Officer
It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this Ordinance
is being violated, he or she shall notify in writing the person responsible for such violation,
indicating the nature of the violation and ordering the action necessary to correct it,
including discontinuance of illegal use of land, buildings or structures, or work being done,
removal of illegal buildings or structures, and abatement of nuisance conditions. A copy
of such notices shall be submitted to the municipal officers and be maintained as a
permanent record.
The Code Enforcement Officer shall conduct on-site inspections to ensure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 41 of 50
The Code Enforcement Officer shall keep a complete record of all essential transactions
of the office, including applications submitted, permits granted or denied, variances
granted or denied, revocation actions, revocation of permits, appeals, court actions,
violations investigated, violations found, and fees collected.
30.16.10.03
Legal
When the above action does not result in the correction or abatement of the violation or
nuisance condition, the Municipal Officers, upon notice from the Code Enforcement
Officer, are hereby directed to institute any and all actions and proceedings, either legal
or equitable, including seeking injunctions of violations and the imposition of fines, that
may be appropriate or necessary to enforce the provisions of this Ordinance in the name
of the municipality.
The municipal officers, or their authorized agent, are hereby authorized to enter into
administrative consent agreements for the purpose of eliminating violations of this
Ordinance and recovering fines without Court action.
Such agreements shall not allow an illegal structure or use to continue unless there is
clear and convincing evidence that the illegal structure or use was constructed or
conducted as a direct result of erroneous advice given by an authorized municipal official
and there is no evidence that the owner acted in bad faith, or unless the removal of the
structure or use will result in a threat or hazard to public health and safety or will result
in substantial environmental damage.
30.16.10.04
Fines
Any person, including but not limited to a landowner, a landowner's agent or a contractor,
who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. Section 4452.
30.16.11
Definitions
Accessory structure or use: a use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated, shall not subordinate the principal
use of the lot. A deck or similar extension of the principal structure or a garage attached to the
principal structure by a roof or a common wall is considered part of the principal structure.
Aggrieved party: an owner of land whose property is directly or indirectly affected by the
granting or denial of a permit or variance under this Ordinance; a person whose land abuts land
for which a permit or variance has been granted; or any other person or group of persons who
have suffered particularized injury as a result of the granting or denial of such permit or variance.
Agriculture: the production, keeping or maintenance for sale or lease, of plants /or animals,
including, but not limited to: forages and sod crops; grains and seed crops; dairy animals and
dairy products; poultry and poultry products; livestock; fruits and vegetables; and ornamental
green-house products. Agriculture does not include forest management and timber harvesting
activities.
Aquaculture: the growing or propagation of harvestable freshwater, estuarine, or marine plant
or animal species.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 42 of 50
Basal Area: the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive
of bark.
Basement: any portion of a structure with a floor-to-ceiling height of 6 feet or more and having
more than 50% of its volume below the existing ground level.
Boat Launching Facility: a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for vehicles
and trailers.
Bureau of Forestry: State of Maine Department of Agriculture, Conservation and Forestry,
Bureau of Forestry.
Campground: any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy: the more or less continuous cover formed by tree crowns in a wooded area.
Coastal wetland: all tidal and subtidal lands; all lands with vegetation present that is tolerant
of salt water and occurs primarily in a salt water or estuarine habitat; and any swamp, marsh,
bog, beach, flat or other contiguous low land that is subject to tidal action during the highest tide
level for the year in which activity is proposed as identified in tide tables published by the National
Ocean Service. Coastal wetlands may include portions of coastal sand dunes.
Commercial use: the use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the buying
and selling of goods and/or services, exclusive of rental of residential buildings and/or dwelling
units.
DBH: the diameter of a standing tree measured 4.5 feet from ground level.
Development: a change in land use involving alteration of the land, water or vegetation, or the
addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements: numerical standards relating to spatial relationships including but
not limited to setback, lot area, shore frontage and height.
Disability: any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or sensory impairment which requires
special education, vocational rehabilitation or related services.
Driveway: a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations: operations conducted for the public health, safety or general welfare,
such as protection of resources from immediate destruction or loss, law enforcement, and
operations to rescue human beings, property and livestock from the threat of destruction or
injury.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 43 of 50
Essential services: gas, electrical or communication facilities; steam, fuel, electric power or
water transmission or distribution lines, towers and related equipment; telephone cables or lines,
poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage
lines, collection or supply systems; and associated storage tanks. Such systems may include
towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes,
traffic signals, hydrants and similar accessories, but shall not include service drops or buildings
which are necessary for the furnishing of such services.
Excavation contractor: an individual or firm engaged in a business that causes the disturbance
of soil, including grading, filling and removal, or in a business in which the disturbance of soil
results from an activity that the individual or firm is retained to perform.
Expansion of a structure: an increase in the footprint of a structure, including all extensions
such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use: the addition of one or more months to a use's operating season; or the use
of more footprint of a structure, or ground area devoted to a particular use.
Family: one or more persons occupying a premises and living as a single housekeeping unit.
Floodway: the channel of a river or other watercourse and adjacent land areas that must be
reserved in order to discharge the 100-year flood without cumulatively increasing the water
surface elevation by more than one foot in height.
Floor area: the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior
walls.
Footprint: the entire area of ground covered by the structures on a premises, including but not
limited to cantilever or similar overhanging extensions, as well as unenclosed structures, such as
patios and decks.
Forested wetland: a freshwater wetland dominated by woody vegetation that is six (6) meters
tall (approximately twenty (20) feet) or taller.
Foundation: the supporting substructure of a building or other structure, excluding wooden sills
and post supports, but including basements, slabs, frost walls, or other base consisting of
concrete, block, brick or similar material.
Freshwater wetland: freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1. Of two of more contiguous acres; or less than five contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in excess of five acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform
to the criteria of this definition.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 44 of 50
Functionally water-dependent uses: those uses that require, for their primary purpose,
location on submerged lands or that require direct access to, or location in, waters and that
cannot be located away from these waters. The uses include, but are not limited to commercial
and recreational fishing and boating facilities, finfish and shellfish processing, fish-related storage
and retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards
and boat building facilities, marinas, navigation aids, basins and channels, shoreline structures
necessary for erosion control purposes, industrial uses dependent upon water-borne
transportation or requiring large volumes of cooling or processing water that cannot reasonably
be located or operated at an inland site, and uses that primarily provide general public access to
waters. Recreational boat storage buildings are not considered to be a functionally water-
dependent use.
Ground cover: small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Hazard tree: a tree with structural defect, combination of defects, or disease resulting in a
structural defect that under normal range of environmental conditions at the site exhibits a high
probability of failure and loss of a major structural component of the tree in a manner that will
strike a target. A normal range of environmental conditions does not include meteorological
anomalies, such as, but not limited to: hurricanes; hurricane-force winds; tornados; microbursts;
or significant ice storm events. Hazard trees also include those trees that pose a serious and
imminent risk to bank stability. A target is the area where personal injury or property damage
could occur if the tree or a portion of the tree fails. Targets include roads, driveways, perking
areas, structures, campsites, and any other developed area where people frequently gather and
linger.
Height of a structure: the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances that have no floor area.
Home occupation: an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no more
than two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure: any change in a structure or property which
causes further deviation from the dimensional standard(s) creating the nonconformity such as,
but not limited to, reduction in water body, tributary stream or wetland setback distance, increase
in lot coverage, or increase in height of a structure. Property changes or structure expansions
which either meet the dimensional standard or which cause no further increase in the linear extent
of nonconformance of the existing structure shall not be considered to increase nonconformity.
For example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area
than does any portion of the existing nonconforming structure. Hence, a structure may be
expanded laterally provided that the expansion extends no closer to the water body, tributary
stream, or wetland than the closest portion of the existing structure from that water body,
tributary stream, or wetland. Included in this allowance are expansions which in-fill irregularly
shaped structures.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 45 of 50
Individual private campsite: an area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10) individuals
and which involves site improvements which may include but not be limited to a gravel pad,
parking area, fire place, or tent platform.
Industrial: The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Institutional: a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for
public purposes.
Licensed forester: a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area: The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two lots.
Marina: a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and
outdoor storage of boats and marine equipment, bait and tackle shops and marine fuel service
facilities.
Market value: the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
Mineral exploration: hand sampling, test boring, or other methods of determining the nature
or extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction: any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other
like material from its natural location and to transport the product removed, away from the
extraction site.
Minimum lot width: the closest distance between the side lot lines of a lot. When only two lot
lines extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential: a residential structure containing three (3) or more residential dwelling
units.
Native: indigenous to the local forests.
Non-conforming condition: non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment took
effect.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 46 of 50
Non-conforming lot: a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements of the
district in which it is located.
Non-conforming structure: a structure which does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage or footprint, but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took
effect.
Non-conforming use: use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was
in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation: species of vegetation listed by the Maine
Department of Agriculture, Conservation and Forestry as being invasive in Maine ecosystems
and not native to Maine ecosystems.
Nonvegetated surfaces (lot coverage): any surface area that is devoid of or functionally
devoid of vegetation within the shoreland zone, excluding surfaces that are naturally
nonvegetated and not a result of land use activities.
Nonvegetated surfaces include but are not limited to: areas that are constructed through use
such as areas of compacted soil; areas of gravel, asphalt, or other similar material; parking areas;
driveways; roofs; roads; campsite pads; and engineered paver products of any type, regardless
of whether vegetation is present on these surfaces.
Normal high-water line: that line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water or changes in vegetation, and which
distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers that support non-forested wetland vegetation and hydric soils and that are
at the same or lower elevation as the water level of the river during the period of normal high-
water are considered part of the river.
Outlet stream: any perennial stream or intermittent stream, as shown on the most recent
highest resolution version of the national hydrography dataset available from the United States
Geological Survey on the website of the United States Geological Survey or the national map that
flows from a freshwater wetland.
Person: an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or below
the normal high-water line or within a wetland:
Temporary: Structures which remain in or over the water for less than seven (7) months
in any period of twelve (12) consecutive months.
Permanent: Structures which remain in or over the water for seven (7) months or more
in any period of twelve (12) consecutive months.
Principal structure: a structure other than one which is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 47 of 50
Principal use: a use other than one which is wholly incidental or accessory to another use on
the same lot.
Public facility: any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental body
or public entity.
Recent floodplain soils: the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility: a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Recreational vehicle: a vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which may
include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be
considered as a vehicle and not as a structure, the unit must remain with its tires on the ground,
and must be registered with the State Division of Motor Vehicles.
Replacement system: a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or 2.) any existing overboard wastewater discharge.
Residential dwelling unit: a room or group of rooms designed and equipped exclusively for
use as permanent, seasonal, or temporary living quarters for only one family at a time, and
containing cooking, sleeping and toilet facilities. The term shall include mobile homes and rental
units that contain cooking, sleeping, and toilet facilities regardless of the time-period rented.
Recreational vehicles are not residential dwelling units.
Riprap: rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
River: a free-flowing body of water including its associated floodplain wetlands from that point
at which it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road: a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Salt marsh: Areas of coastal wetland (most often along coastal bays) that support salt tolerant
species, and where at average high tide during the growing season, the soil is irregularly
inundated by tidal waters. The predominant species is saltmarsh cordgrass (Spartina alterniflora).
More open areas often support widgeon grass, eelgrass, and Sago pondweed.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 48 of 50
Salt meadow: Areas of a coastal wetland that support salt tolerant plant species bordering the
landward side of salt marshes or open coastal water, where the soil is saturated during the
growing season but which is rarely inundated by tidal water. Indigenous plant species include salt
meadow cordgrass (Spartina patens) and black rush; common threesquare occurs in fresher
areas.
Sapling: a tree species that is less than two (2) inches in diameter at four and one half
(4.5) feet above ground level.
Seedling: a young tree species that is less than four and one half (4.5) feet in height above
ground level.
Service drop: any utility line extension which does not cross or run beneath any portion of a
water body provided that:
A. In the case of electric service
i.
the placement of wires and/or the installation of utility poles is located entirely
upon the premises of the customer requesting service or upon a roadway right-of-
way; and
ii.
the total length of the extension is less than one thousand (1,000) feet.
B. In the case of telephone service
i.
the extension, regardless of length, will be made by the installation of telephone
wires to existing utility poles, or
ii.
the extension requiring the installation of new utility poles or placement
underground is less than one thousand (1,000) feet in length.
Setback: the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road, parking
space or other regulated object or area.
Shore frontage: the length of a lot bordering on a water body or wetland measured in a straight
line between the intersections of the lot lines with the shoreline.
Shoreland zone: the land area located within two hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of any river; within 250 feet of the upland edge of a
coastal wetland, including all areas affected by tidal action; within 250 feet of the upland edge of
a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal high-
water line of a stream.
Shoreline: the normal high-water line, or upland edge of a wetland.
Significant River Segments: See Appendix A or 38 M.R.S.A. section 437.
Skid Road or Skid Trail: a route repeatedly used by forwarding machinery or animal to haul or
drag forest products from the stump to the yard or landing, the construction of which requires
minimal excavation.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 49 of 50
Slash: the residue, e.g., treetops and branches, left on the ground after a timber harvest.
Storm-damaged tree: a tree that has been uprooted, blown down, is lying on the ground, or
that remains standing and is damaged beyond the point of recovery as the result of a storm
event.
Stream: a channel between defined banks created by the action of surface water, characterized
by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing
waterborne deposits or exposed soil, parent material or bedrock, and is connected hydrologically
with other water bodies or wetlands; or a free-flowing body of water depicted as an intermittent
on the most recent, highest resolution version of the national hydrography dataset available from
the United States Geological Survey, on the website of the United States Geological Survey or the
national map, to the point where the body of water becomes a river or flows to another water
body or wetland or where the stream meets the shoreland zone of another water body or wetland.
When a stream meets the shoreland zone of a water body or wetland and a channel forms
downstream of the water body or wetland as an outlet, that channel is also a stream.
Includes streams identified on Town of Veazie Shoreland Map created by James W. Sewall
Company dated 1989.
Structure: whether temporarily or permanently located, built, constructed or erected for the
support, shelter or enclosure of persons, animals, goods or property of any kind; and anything
built, constructed or erected on or in the ground. The term includes structures temporarily or
permanently located such as decks, patios, and satellite dishes. Structure does not include fences;
poles; wiring, guy wires, gut anchors and other aerial equipment normally associated with service
drops; subsurface waste water disposal systems as defined in Title 30-A, section 4201, subsection
5; geothermal heat exchange wells as defined in Title 32, section 4700-E, subsection 3-C; and
wells or water wells as defined in Title 32, section 4700-E subsection 8.
Substantial start: completion of thirty (30) percent of a permitted structure or use measured
as a percentage of estimated total cost.
Subsurface sewage disposal system: any system designed to dispose of waste or waste
water on or beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal
fields; grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture,
mechanism, or apparatus used for those purposes; does not include any discharge system
licensed under 38 M.R.S.A. section 414, any surface waste water disposal system, or any
municipal or quasi-municipal sewer or waste water treatment system.
Sustained slope: a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tidal waters: all waters affected by tidal action during the highest annual tide.
Timber harvesting: the cutting and removal of timber for the primary purpose of selling or
processing forest products. "Timber harvesting" does not include the cutting or removal of
vegetation within the shoreland zone when associated with any other land use activities.
The cutting or removal of trees in the shoreland zone on a lot that has less than two (2) acres
within the shoreland zone shall not be considered timber harvesting. Such cutting or removal of
trees shall be regulated pursuant to Section 15 (P), Clearing or Removal of Vegetation for
Activities Other Than Timber Harvesting.
TOWN OF VEAZIE CODE - CHAPTER 30 - SHORELAND ZONING
Chapter 30: Shoreland Zoning
Page 50 of 50
Tree: a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter
at four and one half (4.5) feet above the ground, with a more or less definite crown, and
reaching a height of at least ten (10) feet at maturity.
Tributary stream: means a channel between defined banks created by the action of surface
water, which is characterized by the lack of terrestrial vegetation or by the presence of a bed,
devoid of topsoil, containing waterborne deposits or exposed soil, parent material or bedrock;
and which is connected hydrologically with other water bodies. "Tributary stream" does not
include rills or gullies forming because of accelerated erosion in disturbed soils where the natural
vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and
only applies to that portion of the tributary stream located within the shoreland zone of the
receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland: the boundary between upland and wetland. For purposes of a
coastal wetland, this boundary is the line formed by the landward limits of the salt tolerant
vegetation and/or the highest annual tide level, including all areas affected by tidal action. For
purposes of a freshwater wetland, the upland edge is formed where the soils are not saturated
for a duration sufficient to support wetland vegetation; or where the soils support the growth of
wetland vegetation, but such vegetation is dominated by woody stems that are six (6) meters
(approximately twenty feet) tall or taller.
Vegetation: all live trees, shrubs, and other plants including without limitation, trees both over
and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Velocity zone: an area of special flood hazard extending from offshore to the inland limit of
primary frontal dune along an open coast and any other area subject to high velocity wave action
from storms or seismic sources.
Volume of a structure: the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water body: any river or stream.
Water crossing: any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, though, or over the water or wetland. Such projects
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and
cables as well as maintenance work on these crossings. This definition includes crossings for
timber harvesting equipment and related activities.
Wetland: a freshwater or coastal wetland.
Woody Vegetation: live trees or woody, non-herbaceous shrubs.