SHORELAND ZONING
ORDINANCE
FOR THE
TOWN OF WARREN, MAINE
ENACTED: November 10, 2009
AMENDED: June 11, 2024
CERTIFIED BY:
Corinne E.R. Michaud
Town Clerk
Shoreland Zoning Ordinance
Town of Warren
TABLE OF CONTENTS
Page
1. Purposes
1
2. Authority
1
3. Applicability
1
4. Effective Date
1
5. Availability
1
6. Severability
1
7. Conflicts with Other Ordinances
2
8. Amendments
2
9. Districts and Zoning Map
2
a. Official Shoreland Zoning Map
2
b. Scale of Map
2
c.
Certification of Official Shoreland Zoning Map
2
d. Changes to the Official Shoreland Zoning Map
2
10. Interpretation of District Boundaries
2
11. Land Use Requirements
2
12. Non-Conformance
3
a. Purpose
3
b. General
3
c.
Non-Conforming Structures
3
d. Non-Conforming Uses
6
e. Non-Conforming Lots
7
13. Establishment of Districts
7
a. Resource Protection District
7
b. Limited Residential District
8
c.
Limited Commercial District
9
d. General Development I District
9
e. General Development II District
9
f.
Commercial Fisheries/Maritime Activities District
9
g.
Stream Protection District
10
14. Table of Land Uses
10
15. Land Use Standards
13
a. Minimum Lot Standards
13
b. Principal and Accessory Structures
14
c.
Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over
or Beyond the Normal High-Water Line of a Water Body or within a Wetland
16
d. Campgrounds
18
e. Individual Private Campsites
18
f.
Commercial and Industrial Uses
19
g.
Parking Areas
19
h. Roads and Driveways
20
i.
Signs
22
j.
Storm Water Runoff
22
k.
Septic Waste Disposal
22
l.
Essential Services
23
m. Mineral Exploration and Extraction
23
n. Agriculture
24
Shoreland Zoning Ordinance
Town of Warren
o. Timber Harvesting - State Standards
27
p. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting 35
q. Hazard Trees, Storm Damages Trees and Dead Tree Removal
37
r.
Exemptions to Clearing and Vegetation Removal Requirements
38
s.
Revegetation Requirements
40
t.
Erosion and Sedimentation Control
41
u. Soils
42
v.
Water Quality
42
w. Archaeological Site
42
16. Administration
43
a. Administering Bodies and Agents
43
b. Permits Required
43
c.
Permit Application
43
d. Procedure for Administering Permits
44
e. Special Exceptions
45
f.
Expiration of Permit
46
g.
Installation of Public Utility Service
46
h. Appeals
46
i.
Enforcement
49
17. Definitions
50
Appendix A:
38 MRSA Section 437, Significant Rivers Segments Identified
62
Shoreland Zoning Ordinance
Town of Warren
1
Shoreland Zoning Ordinance for the Municipality of
WARREN
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful conditions; to
prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird and other wildlife
habitat; to protect buildings and lands from flooding and accelerated erosion; to protect archaeological and
historic resources; to protect commercial fishing and maritime industries; to protect freshwater and coastal
wetlands; to control building sites, placement of structures and land uses; to conserve shore cove, and visual,
as well as actual, points of access to inland and coastal waters; to conserve natural beauty and open space; and
to anticipate and respond to the impacts of development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 Sections 435-449 of
the Maine Revised Statutes Annotated (MRSA).
3. Applicability. This Ordinance applies to all land areas within two hundred (250) feet, horizontal distance, of the
and all land areas within seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream.
A. Normal high-water line of any great pond or river,
B. Upland edge of a coastal wetland, including all areas affected by tidal action,
C. Upland edge of a freshwater wetland,
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or other structure
extending or located below the normal high-water line of a water body or within a wetland.
Note: Coastal wetlands by definition, include all areas affected by tidal action, not just those areas where salt
marshes and salt meadows exist. Cobble and sand beaches, mudflats, and rocky ledges, below the highest
annual tide are all considered to be coastal wetlands.
4. Effective Date.
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was adopted by the
municipal legislative body on June 20, 2017, shall not be effective unless approved by the Commissioner of
the Department of Environmental Protection. A certified copy of the Ordinance, or Ordinance Amendment,
attested and signed by the Town Clerk, shall be forwarded to the Commissioner for approval. If the
Commissioner fails to act on this Ordinance or Ordinance Amendment, within forty-five (45) days of his/her
receipt of the Ordinance, or Ordinance Amendment, it shall be automatically approved. Any application for
a permit submitted to the municipality within the forty-five (45) day period shall be governed by the terms
of this Ordinance, or Ordinance Amendment, if the Ordinance, or Ordinance Amendment, is approved by
the Commissioner.
5. Availability. A certified copy of this Ordinance shall be filed with the Town Clerk and shall be accessible to any
member of the public. Copies shall be made available to the public at reasonable cost at the expense of the
person making the request. Notice of availability of this Ordinance shall be posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of the Ordinance.
Shoreland Zoning Ordinance
Town of Warren
2
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is inconsistent with
another provision of this Ordinance or any other ordinance, regulation or statute administered by the
municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Town Clerk, shall be submitted to the Commissioner of the
Department of Environmental Protection following adoption by the municipal legislative body and shall not be
effective unless approved by the Commissioner. If the Commissioner fails to act on any amendment within
forty-five (45) days of his/her receipt of the amendment, the amendment is automatically approved. Any
application for a permit submitted to the municipality within the forty-five (45) day period shall be governed by
the terms of the amendment, if such amendment is approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby divided into the
following districts as shown on the Official Shoreland Zoning Map(s) which is (are) made a part of this
Ordinance:
1. Resource Protection
2. Limited Residential
3. Limited Commercial
4. General Development I
5. General Development II
6. Commercial Fisheries/Maritime Activities
7. Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than 1 inch = 2,000
feet. District boundaries shall be clearly delineated and a legend indicating the symbols for each district
shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be certified by the
attested signature of the Town Clerk and shall be located in the municipal office. In the event the
municipality does not have a municipal office, the Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section 8, are made in
the district boundaries or other matter portrayed on the Official Shoreland Zoning Map, such changes shall
be made on the Official Shoreland Zoning Map within thirty (30) days after the amendment has been
approved by the Commissioner of the Department of Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland Zoning Map, district
boundary lines are property lines, the center lines of streets, roads and rights of way, and the boundaries of the
shoreland area as defined herein. Where uncertainty exists as to the exact location of District boundary lines,
the Board of appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall hereafter be used
or occupied, and no building or structure or part thereof shall hereafter be erected, constructed, expanded,
moved or altered and no new lot shall be created except in conformity with all of the regulations herein specified
Shoreland Zoning Ordinance
Town of Warren
3
for the district in which it is located, unless a variance is granted.
12. Non-Conformance
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-conforming
conditions that existed before the effective date of this Ordinance or amendments thereto shall be allowed
to continue, subject to the requirements set forth in Section 12. Except as otherwise provided in this
Ordinance, a non-conforming condition shall not be permitted to become more non-conforming.
B. General
1. Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and the new
owner may continue the non-conforming use or continue to use the non-conforming structure or lot,
subject to the provisions of this Ordinance.
2. Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations which do not
involve expansion of the non-conforming use or structure, and such other changes in a non-conforming
use or structure as federal, state or local building and safety codes may require.
C. Non-Conforming Structures
1. Expansions. All new principal and accessory structures, excluding functionally water-dependent uses,
must meet the water body, tributary stream, or wetland setback requirements contained in Section
15(B)(1). A non-conforming structure may be added to or expanded after obtaining a permit from the
same permitting authority as that for a new structure, if such addition or expansion does not increase
the non-conformity of the structure and is in accordance with subparagraphs a and b below.
a. Expansion of any portion of a structure within 25 feet of the normal high-water line of a water
body, tributary stream, or upland edge of a wetland is prohibited, even if the expansion will not
increase nonconformity with the water body, tributary stream or wetland setback requirement.
Expansion of an accessory structure that is located closer to the normal high-water line of a water
body, tributary stream, or upland edge of a wetland than the principal structure is prohibited, even
if the expansion will not increase nonconformity with the water body, tributary stream, or wetland
setback requirement.
b. Notwithstanding paragraph (a), above, if a legally existing nonconforming principal structure is
entirely located less than 25 feet from the normal high-water line of a water body, tributary
stream, or upland edge of a wetland, that structure may be expanded as follows, as long as all
other applicable municipal land use standards are met and the expansion is not prohibited by
Section 12(C)(1).
i. The maximum total footprint for the principal structure may not be expanded to a size
greater than 800 square feet or thirty (30) percent larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the principal structure may
not be made greater than 15 feet or the height of the existing structure, whichever is
greater.
Shoreland Zoning Ordinance
Town of Warren
4
c.
All other legally existing nonconforming principal and accessory structures that do not meet the
water body, tributary stream, or wetland setback requirements may be expanded or altered as
follows, as long as other applicable municipal land use standards are met and the expansion is not
prohibited by Section 12(C)(1) or Section 12(C)(1)(a) above.
i. For structures located less than 75 feet from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland, the maximum combined total footprint for
all structures may not be expanded to a size greater than 1,000 square feet or 30% larger
than the footprint that existed on January 1, 1989, whichever is greater. The maximum
height of any structure may not be made greater than 20 feet or the height of the existing
structure, whichever is greater.
ii. For structures located less than 100 feet from the normal high-water line of a great pond
classified as GPA or a river flowing to a great pond classified as GPA, the maximum combined
total footprint for all structures may not be expanded to a size greater than 1,500 square
feet, or 30% larger than the footprint that existed on January 1, 1989 whichever is greater.
The maximum height of any structure may not be made greater than 25 feet or the height
of the existing structure, whichever is greater. Any portion of those structures located less
than 75 feet from the normal high-water line of a water body, tributary stream, or upland
edge of a wetland must meet the footprint and heights limits in Section 12(C)(1)(b)(i) and
Section 12(C)(1)(c)(i) above.
iii. In addition to the limitations in subparagraphs (i) and (ii), for structures that are legally
nonconforming due to their location within the Resource Protection District when located
at less than 250 feet from the normal high-water line of a water body or the upland edge if
a wetland, the maximum combined total footprint for all structures may not be expanded
to a size greater than 1,500 square feet or 30% larger than the footprint that existed at the
time the Resource Protection District was established on the lot, whichever is greater. The
maximum height of any structures may not be made greater than 25 feet or the height of
the existing structure, whichever is greater, except that any portion of those structures
located less than 75 feet from the normal high-water line of a water body, tributary stream,
or upland edge of a wetland must meet the footprint and height limits in Section
12(C)(1)(b)(i) and Section 12(C)(1)(c)(i), above.
d. An approved plan for expansion of a nonconforming structure must be recorded by the applicant
with the registry of deeds, within 90 days of approval. The recorded plan must show the existing
and proposed footprint of the non-conforming structure, the existing and proposed structure
height, the footprint of any other structures on the parcel, the Shoreland zone boundary and
evidence of approval by the municipal review authority.
2. Foundations. Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that the setback
requirement is met to the greatest practical extent as determined by the Planning Board or its designee,
basing its decision on the criteria specified in Section 12(C).
Shoreland Zoning Ordinance
Town of Warren
5
3. Relocation. A non-conforming structure may be relocated within the boundaries of the parcel on which
the structure is located provided that the site of relocation conforms to all setback requirements to the
greatest practical extent as determined by the Planning Board and provided that the applicant
demonstrates that the present subsurface sewage disposal system meets the requirements of State
law and the State of Maine Subsurface Wastewater Disposal Rules (Rules) or that a new system can be
installed in compliance with the law and said Rules. In no case shall a structure be relocated in a
manner that causes the structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical extent, the
Planning Board or its designee shall consider the size of the lot, the slope of the land, the potential for
soil erosion, the location of other structures on the property and on adjacent properties, the location
of the septic system and other on-site soils suitable for septic systems, and the type and amount of
vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order to
relocate a structure, the Planning Board shall require replanting of native vegetation to compensate
for the destroyed vegetation in accordance with Section 15(S). In addition, the area from which the
relocated structure was removed must be replanted with vegetation. Replanting shall be required as
follows:
a. Trees removed in order to relocate a structure must be replanted with at least one native tree,
three (3) feet in height, for every tree removed. If more than five (5) trees are planted, no one
species of tree shall make up more than 50% of the number of trees planted. Replaced trees must
be planted no further from the water or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or destroyed in
order to relocate a structure must be re-established. An area at least the same size as the area
where vegetation and/or ground cover was disturbed, damaged, or removed must be
reestablished within the setback area. The vegetation and/or ground cover must consist of similar
native vegetation and/or ground cover that was disturbed, destroyed or removed.
b. Where feasible, when a structure is relocated on a parcel, the original location of the structure
shall be replanted with vegetation which may consist of grasses, shrubs, trees, or a combination
thereof.
4. Reconstruction or Replacement. Any nonconforming structure which is located less than the required
setback from a water body, tributary stream, or wetland and which is removed, or damaged or
destroyed, regardless of the cause, by more than 50% of the market value of the structure before such
damage, destruction or removal, may be reconstructed or replaced provided that a permit is obtained
within eighteen (18) months of the date of said damage, destruction, or removal, and provided that
such reconstruction or replacement is in compliance with the water body, tributary stream or wetland
setback requirement to the greatest practical extent as determined by the Planning Board or its
designee in accordance with the purposes of this Ordinance. In no case shall a structure be
reconstructed or replaced so as to increase its non-conformity. If the reconstructed or replacement
structure is less than the required setback it shall not be any larger than the original structure, except
as allowed pursuant to Section 12(C)(1) above, as determined by the non-conforming footprint of the
reconstructed or replaced structure at its new location. If the total footprint of the original structure
can be relocated or reconstructed beyond the required setback area, no portion of the relocated or
Shoreland Zoning Ordinance
Town of Warren
6
reconstructed structure shall be replaced or constructed at less than the setback requirement for a
new structure. When it is necessary to remove vegetation in order to replace or reconstruct a
structure, vegetation shall be replanted in accordance with Section 12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water body,
tributary stream, or wetland and which is removed by 50% or less of the market value of the structure,
excluding normal maintenance and repair, may be reconstructed in place if a permit is obtained from
the Code Enforcement Officer within one year of such damage, destruction or removal.
In determining whether the building reconstruction or replacement meets the setback to the greatest
practical extent the Planning Board or its designee shall consider, in addition to the criteria in Section
12(C)(3) above, the physical condition and type of foundation present, if any.
5. Change of Use of a Non-Conforming Structure. The use of a non-conforming structure may not be
changed to another use unless the Planning Board, after receiving a written application, determines
that the new use will have no greater adverse impact on the water body, or wetland, or on the subject
or adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board may require written
documentation from the applicant, or agent or qualified professional, regarding the probable effects
on public health and safety, erosion and sedimentation, water quality, fish and wildlife habitat,
vegetative cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and commercial fishing and maritime activities,
and other functionally water-dependent uses.
D. Non-Conforming Uses
1. Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming uses may,
after obtaining a permit from the Planning Board, be expanded within existing residential structures or
within expansions of such structures as permitted in Section 12(C)(1) above.
2. Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use, may not
again be devoted to a non-conforming use except that the Planning Board may, for good cause shown
by the applicant, grant up to a one-year extension to that time period. This provision shall not apply
to the resumption of a use of a residential structure provided that the structure has been used or
maintained for residential purposes during the preceding five (5) year period.
3. Change of Use. An existing non-conforming use may be changed to another non-conforming use
provided that the proposed use has no greater adverse impact on the subject and adjacent properties
and resources, including water dependent uses in the CFFMA district, than the former use, as
determined by the Planning Board. The determination of no greater adverse impact shall be made
according to criteria listed in Section 12(C)(5) above.
Shoreland Zoning Ordinance
Town of Warren
7
E. Non-Conforming Lots
1. Non-Conforming Lots. A non-conforming lot of record as of the effective date of this Ordinance or
amendment thereto may be built upon, without the need for a variance, provided that such lot is in
separate ownership and not contiguous with any other lot in the same ownership, and that all
provisions of this Ordinance except lot size and frontage can be met. Variances relating to setback or
other requirements not involving lot size or frontage shall be obtained by action of the Board of
Appeals.
2. Contiguous Built Lots. If two or more contiguous lots or parcels are in a single or joint ownership of
record at the time of adoption of this Ordinance, if all or part of the lots do not meet the dimensional
requirements of this Ordinance, and if a principal use or structure exists on each lot, the non-
conforming lots may be conveyed separately or together, provided that the State Minimum Lot Size
Law (12 MRSA Sections 4807-A through 4807-D) and the State of Maine Subsurface Wastewater
Disposal Rules are compiled with.
If two or more principal uses or structures existed on a single lot of record on the effective date of this
ordinance, each may be sold on a separate lot provided that the above referenced law and rules are
complied with. When such lots are divided, each lot thus created must be as conforming as possible
to the dimensional requirements of this Ordinance.
3. Contiguous Lots - Vacant or Partially Built. If two or more contiguous lots or parcels are in single or
joint ownership of record at the time of or since adoption or amendment of this Ordinance, if any of
these lots do not individually meet the dimensional requirements of this Ordinance or subsequent
amendments, and if one or more of the lots are vacant or contain no principal structure, the lots shall
be combined to the extent necessary to meet the dimensional requirements.
This provision shall not apply to two (2) or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective date of this Ordinance and recorded
in the registry of deeds if the lot is served by a public sewer or can accommodate a subsurface sewage
disposal system in conformance with the State of Maine Subsurface Wastewater Disposal Rules; and
a. Each lot contains at least one hundred (100) feet of shore frontage and at least twenty thousand
(20,000) square feet of lot area; or
b. Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a) are
reconfigured or combined so that each new lot contains at least one hundred (100) feet of shore
frontage and twenty thousand (20,000) square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which development would
adversely affect water quality, productive habitat, biological ecosystems, or scenic and natural values. This
district shall include the following areas when they occur within the limits of the shoreland zone, exclusive
of the Stream Protection District, except that areas which are currently developed and areas which meet
the criteria for the Limited Commercial, General Development I, General Development II, or Commercial
Fisheries/Maritime Activities Districts shall not be included within the Resource Protection District.
Shoreland Zoning Ordinance
Town of Warren
8
1. Floodplains along rivers and floodplains along artificially formed great ponds along rivers, defined by
the 100-year floodplain as designated on the Federal Emergency Management Agency's (FEMA) Flood
Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the absence of these,
by soil types identified as recent floodplain soils. The district shall also include 100-year floodplains
adjacent to tidal waters as shown on FEMA's Flood Insurance Rate Maps or Flood Hazard Boundary
Maps.
2. Areas of two (2) or more contiguous acres with sustained slopes of twenty (20) percent or greater.
3. Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils, which are
not part of a freshwater or coastal wetland as defined, and which are not part of a freshwater or coastal
wetland as defined, and which are not surficially connected to a water body during the period of spring
high water.
NOTE: These areas usually consist of forested wetlands abutting water bodies and non-forested
Wetlands.
4. Land areas along rivers subject to severe bank erosion, undercutting or river bed movement, and lands
adjacent to tidal waters which are subject to severe erosion or mass movement, such as steep coastal
bluffs.
NOTE: Municipalities may also include the following other areas which have been recommended for
protection in the comprehensive plan of the municipality, or as otherwise endorsed for protection by the
municipal legislative body, such as:
a. Other important wildlife habitat;
b. Natural sites of significant scenic or esthetic value;
c.
Areas designated by federal, state or municipal governments as natural areas of significance to be
protected from development; and
d. Other significant areas which should be included in this district to fulfill the purposes of this
Ordinance such as, but not limited to, existing public access areas and certain significant
archaeological and historic sites deserving of long-term protection as determined by the
municipality after consultation with the Maine Historic Preservation Commission.
e. Areas within 250 feet, horizontal distance, of the upland edge of freshwater and/or coastal
wetlands, which are rated "moderate" or "high" value waterfowl and wading bird habitat,
including nesting and feeding areas, by the Maine Department of Inland Fisheries and Wildlife
(MDIF&W). These areas are generally depicted on a Geographic Information System (GIS) data
layer.
B. Limited Residential District. The Limited Residential District includes those areas suitable for residential
and recreational development. It includes areas other than those in the Resource Protection District, or
Stream Protection District, and areas which are used less intensively than those in the Limited Commercial
District, the General Development District, or the Commercial Fisheries/Maritime Activities District.
Shoreland Zoning Ordinance
Town of Warren
9
C. Limited Commercial District. The Limited Commercial District includes areas of mixed, light commercial
and residential uses, exclusive of the Stream Protection District, which should not be developed as
intensively as the General Development District. This district includes areas of two or more contiguous
acres in size devoted to a mix of residential and low intensity business and commercial uses. Industrial uses
are prohibited.
D. General Development I District. The General Development District includes the following types of areas:
1. Areas of two (2) or more contiguous acres devoted to commercial, industrial or intensive recreational
activities, or a mix of such activities, including but not limited to the following:
a. Areas devoted to manufacturing, fabricating or other industrial activities;
b. Areas devoted to wholesaling, warehousing, retail trade and service activities, or other commercial
activities; and
c.
Areas devoted to intensive recreational development and activities, such as, but not limited to
amusement parks, race tracks and fairgrounds.
2. Areas otherwise discernible as having patterns of intensive commercial, industrial or recreational uses.
E. General Development II District. The General Development II District includes the same types of areas as
those listed for the General Development I District. The General Development II District, however, shall be
applied to newly established General Development District where the pattern of development at the time
of adoption is undeveloped or not as intensively developed as that of the General Development I District.
Portions of the General Development District I or II may also include residential development. However,
no area shall be designated as a General Development I or II District based solely on residential use.
In areas adjacent to great ponds classified GPA and adjacent to rivers flowing to great ponds classified GPA,
the designation of an area as a General Development District shall be based upon uses existing at the time
of adoption of this Ordinance. There shall be no newly established General Development Districts or
expansions in area of existing General Development Districts adjacent to great ponds, classified GPA, and
adjacent to rivers that flow to great ponds classified GPA.
F. Commercial Fisheries/Maritime Activities District. The Commercial Fisheries/Maritime Activities District
includes areas where the existing predominant pattern of development is consistent with the allowed uses
for this district as indicated in the Table of Land Uses, Section 14, and other areas which are suitable for
functionally water-dependent uses, taking into consideration such factors as:
1. Shelter from prevailing winds and waves;
2. Slope of the land within two hundred fifty (250) feet, horizontal distance, of the normal high-water
line;
3. Depth of the water within one hundred (150) feet, horizontal distance, of the shoreline;
Shoreland Zoning Ordinance
Town of Warren
10
4. Available support facilities including utilities and transportation facilities; and
5. Compatibility with adjacent upland uses.
G. Stream Protection District. The Stream Protection District includes all land areas within seventy-five (75)
feet, horizontal distance of the normal high-water line of a stream, exclusive of those areas within two
hundred fifty (250) feet, horizontal distance, of the normal high-water line of a great pond, river or saltwater
body, or within two hundred fifty (250) feet, horizontal distance of the upland edge of a freshwater or
coastal wetland. Where a stream and its associated shoreline area are located within two hundred fifty
(250) feet, horizontal distance, of the above water bodies or wetlands, that land area shall be regulated
under the terms of the shoreland district associated with that water body or wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the Shoreland Zone, shall conform
with all of the applicable land use standards in Section 15. The district designation for a particular site shall be
determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes -
Allowed (no permit required but the use must comply with all applicable land use standards).
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO -
Allowed with permit issued by the Code Enforcement Officer.
LPI -
Allowed with permit issued by the Local Plumbing Inspector.
District Abbreviations:
RP -
Resource Protection
GD -
General Development
LR -
Limited Residential
CFMA - Commercial Fisheries/Maritime Activities
LC -
Limited Commercial
SP -
Stream Protection
The following notes are applicable to the Land Uses Table on the following page:
NOTE: The term "functionally water-dependent use" as defined, includes a very diverse group of uses ranging
from large, industrial facilities that receive shipments by water or use water for cooling, to traditional
commercial fishing enterprises, and public shorefront parks. Communities are encouraged to define the
functionally water-dependent uses which are to be allowed and which are prohibited in each CFMA district,
based on considerations of prevailing existing uses, desired future uses, available support facilities, site
suitability and compatibility with adjacent uses. A municipality can narrow the range of allowed uses by
precluding certain functionally water-dependent uses, or by adopting conditional uses for certain functionally
water-dependent uses that it determines would only be compatible with its plan for the waterfront under
certain conditions.
Shoreland Zoning Ordinance
Town of Warren
11
NOTE: Recreational water-dependent uses such as marinas and excursion vessels may, in some coactivities.
Therefore communities may wish to preclude or further limit these types of uses in this district in order to
protect berthing space and onshore staging areas for commercial fishing enterprisemmunities, displace or
threaten to displace traditional commercial fisheries and maritime.
Shoreland Zoning Ordinance
Town of Warren
12
TABLE 1. LAND USES IN THE SHORELAND ZONE
DISTRICT
LAND USES
SP
RP
LR
LC
GD
CFMA
1. Non-intensive recreational uses not requiring structures such as hunting, fishing &
hiking.
Yes
Yes
Yes
Yes
Yes
Yes
2. Motorized vehicular traffic on existing roads & trails.
Yes
Yes
Yes
Yes
Yes
Yes
3. Forest management activities except for timber harvesting.
Yes
Yes
Yes
Yes
Yes
Yes
4. Timber Harvesting
Yes
CEO13
Yes
Yes
Yes
Yes
5. Clearing or removal of vegetation for activities other than timber harvesting.
CEO
CEO1
Yes
Yes
Yes
Yes
6. Fire Prevention Activities
Yes
Yes
Yes
Yes
Yes
Yes
7. Wildlife Management Practices
Yes
Yes
Yes
Yes
Yes
Yes
8. Soil and Water Conservation Practices
Yes
Yes
Yes
Yes
Yes
Yes
9. Mineral Exploration
No
Yes2
Yes2
Yes2
Yes2
Yes2
10. Mineral extraction, including sand and gravel extraction.
No
PB3
PB
PB
PB
PB
11. Surveying and Resource Analysis
Yes
Yes
Yes
Yes
Yes
Yes
12. Emergency Operations
Yes
Yes
Yes
Yes
Yes
Yes
13. Agriculture
Yes
PB
Yes
Yes
Yes
Yes
14. Aquaculture
PB
PB
PB
Yes
Yes
Yes
15. Principal Structures and Uses
A. One and two family residential, including driveways.
PB4
PB9
CEO
CEO
CEO
No
B. Multi-Unit Residential
No
No
PB
PB
PB
No
C. Commercial
No
No10
No10
PB
PB
PB5
D. Industrial, other than industrial metallic mineral mining
No
No
No
No
PB
PB5
D-1. Industrial metallic mineral mining
No
No
No
No
No
No
E. Governmental and Institutional
No
No
PB
PB
PB
PB5
F. Small non-residential facilities for educational, scientific or nature
interpretation purposes.
PB4
PB
CEO
CEO
CEO
PB5
16. Structures accessory to allowed uses.
PB4
PB
CEO
CEO
Yes
Yes
17. Piers, docks, wharfs, bridges and other structures and uses extending over or below
the normal high-water line or within a wetland.
A. Temporary
Yes
Yes
Yes
Yes
Yes
Yes
B. Permanent
PB
PB
PB
PB
PB
PB5
18. Conversions of seasonal residences to year-round residences.
LPI
PB9
LPI
LPI
LPI
No
19. Home Occupations
PB
PB
PB
CEO
Yes
Yes
20. Private sewage disposal systems for allowed uses.
LPI
PB9
LPI
LPI
LPI
LPI
21. Essential Services
PB6
PB6
PB
PB
PB
PB
A. Roadside Distribution Lines (34.5kV and lower)
CEO6
CEO6
Yes12
Yes12
Yes12
Yes12
B. Non-roadside or cross-country distribution lines involving ten poles or less in
the shoreland zone.
PB6
PB6
CEO
CEO
CEO
CEO
C. Non-roadside or cross-country distribution lines involving eleven or more poles
in the shoreland zone.
PB6
PB6
PB
PB
PB
PB
D. Other essential services.
PB6
PB6
PB
PB
PB
PB
22. Service drops, as defined, to allowed uses.
Yes
Yes
Yes
Yes
Yes
Yes
23. Public and private recreational areas involving minimal structural development.
PB
PB
PB
CEO
CEO
CEO5
24. Individual, private campsites.
CEO
CEO
CEO
CEO
CEO
CEO
25. Campgrounds
No
No7
PB
PB
PB
No
26. Road Construction
PB
No8
PB
PB
PB
PB5
27. Land Management Roads
Yes
PB13
Yes
Yes
Yes
Yes
28. Parking Facilities
No
No7
PB
PB
PB
PB5
29. Marinas
PB
No
PB
PB
PB
PB
30. Filling and earth moving of <10 cubic yards.
CEO
CEO
Yes
Yes
Yes
Yes
31. Filling and earth moving of >10 cubic yards.
PB
PB
CEO
CEO
CEO
CEO
32. Signs
Yes
Yes
Yes
Yes
Yes
Yes
33. Uses similar to allowed uses.
CEO
CEO
CEO
CEO
CEO
CEO
34. Uses similar to uses requiring a CEO permit.
CEO
CEO
CEO
CEO
CEO
CEO
35. Uses similar to uses requiring a PB permit.
PB
PB
PB
PB
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only (see note on previous page).
6See further restrictions in Section 15(L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
Shoreland Zoning Ordinance
Town of Warren
13
8Except as provided in Section 15(H)(4).
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16IE), Special Exceptions.
Two family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
11Exclusing bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required but must file a written "notice of intent to construct" with CEO.
13Option 3 towns only.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant
to 38 MRSA, Section 480-C, if the activity occurs in, on, over or adjacent to any freshwater or coastal wetland, great pond, river, stream or
brook and operates in such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to a sand dune; or
D.
Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall conform with the following provision
if applicable.
A. Minimum Lot Standards
1.
Minimum Lot
Minimum Shore
Area (Sq. Ft.)
Frontage (Ft.)
a. Residential per Dwelling Unit
i. Within the Shoreland Zone
Adjacent to Tidal Areas
30,000
150
ii. Within the Shoreland Zone
Adjacent to Non-Tidal Areas
40,000
200
b. Governmental, Institutional, or Commercial per Principal Structure
i. Within the Shoreland Zone Adjacent to Tidal Areas,
Exclusive Of Those Zoned for CFMA
40,000
200
ii. Within the Shoreland Zone Adjacent to Tidal Areas
Zoned For CFMA
NONE
NONE
iii. Within the Shoreland Zone Adjacent to
Non-Tidal Areas
60,000
300
c.
Public and Private Recreational Facilities
i. Within the Shoreland Zone Adjacent
to Tidal and Non-Tidal Areas
40,000
200
2. Land below the normal high-water line of a water body or upland edge of a wetland and land serving
mor beneath roads han two (2) lots shall not be included toward calculating minimum lot area.
Shoreland Zoning Ordinance
Town of Warren
14
3. Lots located on opposite sides of a public or private road shall be considered each a separate tract or
parcel of land unless such road was established by the owner of land on both sides thereof after
September 22, 1971.
4. The minimum width of any portion of any lot within one hundred (100) feet, horizontal distance, of the
normal high-water line of a water body or upland edge of a wetland shall be equal to or greater than
the shore frontage requirement for a lot with the proposed use.
5. If more than one residential dwelling unit or more than one principal commercial or industrial structure
is constructed on a single parcel, all dimensional requirements shall be met for each additional dwelling
unit or principal structure.
B. Principal and Accessory Structures
1. All new principal and accessory structures shall be set back at least one hundred (100) feet, horizontal
distance, from the normal high-water line of great ponds classified GPA and rivers that flow to great
ponds classified GPA, and seventy five (75) feet, horizontal distance, from the normal high-water line
of other water bodies, tributary streams, or the upland edge of a wetland, except that in the General
Development district the setback from the normal high-water line shall be at least twenty five (25) feet,
horizontal distance, and in the Commercial Fisheries/Maritime Activities District there shall be no
minimum setback. In the Resource Protection District the setback requirement shall be two hundred
fifty (250) feet, horizontal distance, except for structures, roads, parking spaces or other regulated
objects specifically allowed in that district in which case the setback requirements specified above shall
apply.
In addition:
a. The water body or wetland setback provision shall neither apply to structures which require direct
access to the water as an operational necessity, such as piers docks and retaining walls, nor to
other functionally water-dependent uses.
b. All principal structures along Significant River Segments as listed in 38 MRSA, Section 437 (see
Appendix A) shall be set back a minimum of one hundred and twenty-five (125) feet, horizontal
distance, from the normal high-water line and shall be screened from the river by existing
vegetation. This provision does not apply to structures related to hydropower facilities.
c.
For principal structures, water and wetland setback measurements shall be taken from the top of
a coastal bluff that has been identified on Coastal Bluff maps as being "highly unstable" of
"unstable" by the Maine Geological Survey pursuant to its "Classification of Coastal Bluffs" and in
disagreement as to the specific location of a "highly unstable" or "unstable" bluff, or where the
Professional Engineer, a Maine Certified Soil Scientist, a Maine State Geologist, or other qualified
individual to make a determination. If agreement is still not reached, the applicant may appeal
the matter to the Board of Appeals.
d. On a non-conforming lot of record on which only a residential structure exists and it is not possible
to place an accessory structure meeting the required water body, tributary stream or wetland
setbacks, the Code Enforcement Officer may issue a permit to place a single accessory structure,
with no utilities, for the storage of yard tools and similar equipment. Such accessory structure
shall not exceed eighty (80) square feet in area nor eight (8) feet in height and shall be located as
far from the shoreline or tributary stream as practical and shall meet all other applicable standards,
Shoreland Zoning Ordinance
Town of Warren
15
including lot coverage and vegetation clearing limitations. In no case shall the structure be located
closer to the shoreline or tributary stream than the principal structure.
NOTE: All tidal land which is subject to tidal action during the highest annual tide is coastal wetland.
NOTE: A municipality may within its ordinance, authorize the Planning Board to increase the required
setback of a proposed structure, as a condition to permit approval, if necessary, to accomplish the purposes
of this ordinance. Instances where a greater setback may be appropriate include, but are not limited to:
areas of steep slope; shallow or erodible soils; or where an adequate vegetative buffer does not exist.
NOTE: A tributary stream may be perennial or intermittent. Where a tributary stream is present within the
shoreland zone, setback standards from that tributary stream are applicable.
2. Principal or accessory structures and expansions of existing structures which are permitted in the
Resource Protection, Limited Residential, Limited Commercial, and Stream Protection Districts, shall
not exceed thirty-five (35) feet in height. This provision shall not apply to structures such as
transmission towers, windmills, antennas, and similar structures having no floor area.
NOTE: A municipality may also exempt a cupola, dome, widow's walk or other similar feature from the
height limits in accordance with 48 MRSA Section 439-A(9).
3. The lowest floor elevation or openings of all buildings and structures, including basements, shall be
elevated at least two (2) feet above the elevation of the 100-year flood, the flood of record, or in the
absence of these, the flood as defined by soil types identified as recent flood-plain soils. In those
municipalities that participate in the National Flood Insurance Program and have adopted the April
2005 version, or later version, of the Floodplain Management Ordinance, accessory structures may be
placed in accordance with the standards of that ordinance and need not meet the elevation
requirements of this paragraph.
4. With the exception of General Development Districts located adjacent to coastal wetlands and rivers
that do not flow to great ponds and Commercial Fisheries/Maritime Activities Districts, non-vegetated
surfaces shall not exceed a total of twenty (20) percent of the portion of the lot located within the
shoreland zone. This limitation does not apply to public boat launching facilities regardless of the
district in which the facility is located.
In a General Development District located adjacent to coastal wetlands or rivers that do not flow to
great ponds, or in a Commercial fisheries/Maritime Activities District non-vegetated surfaces shall not
exceed a total of seventy (70) percent of the portion of the lot located within the shoreland zone.
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not limited to the
following: structures, driveways, parking areas, and other areas from which vegetation has been
removed. Naturally occurring ledge and rock outcroppings are not counted as non-vegetated surfaces
when calculating lot coverage for lots of record on March 24, 1990 and in continuous existence since
that date.
5. Retaining walls that are not necessary for erosion control shall meet the structure setback requirement,
except for low retaining walls and associated fill provided all of the following conditions are met:
a. The site has been previously altered and an effective buffer does not exist;
Shoreland Zoning Ordinance
Town of Warren
16
b. The wall(s) is (are) at least twenty-five (25) feet, horizontal distance, from the normal high-water
line of a water body, tributary stream, or upland edge of a wetland;
c.
The site where the retaining wall will be constructed is legally existing lawn or is a site eroding from
lack of naturally occurring vegetation, and which cannot be stabilized with vegetative plantings;
d. The total height of the wall(s), in the aggregate, are no more than twenty-four (24) inches;
e. Retaining walls are located outside of the 100-year floodplain on rivers, streams, coastal wetlands,
and tributary streams, as designated on the Federal Emergency Management Agency's (FEMA)
Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood of record, or in the
absence of these, by soil types identified as recent flood plain soils;
f.
The area behind the wall is revegetated with grass, shrubs, trees, or a combination thereof, and
no further structural development will occur within the setback area, including patios and decks;
and
g.
A vegetated buffer area is established within twenty-five (25) feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following characteristics:
i. The buffer must include shrubs and other woody and herbaceous vegetation. Where
natural ground cover is lacking, the area must be supplemented with leaf or bark mulch;
ii. Vegetation plantings must be in quantities sufficient to retard erosion and provide for
effective infiltration of stormwater runoff;
iii. Only native species may be used to establish the buffer area;
iv. A minimum buffer width of fifteen (15) feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
v. A footpath not to exceed the standards in Section 15(P)(2)(a) may traverse the buffer;
6. Notwithstanding the requirements stated above, stairways or similar structures may be allowed with
a permit from the Code Enforcement Officer to provide shoreline access in areas of steep slopes or
unstable soils provided: that the structure is limited to a maximum of four (4) feet in width; that the
structure does not extend below or over the normal high-water line of a water body or upland edge of
a wetland (unless permitted by the Department of Environmental Protection pursuant to the Natural
Resources Protection Act, 38 MRSA, Section 480-C); and that the applicant demonstrates that no
reasonable access alternative exists on a property.
C. Piers, Docks, wharves, Bridges and Other Structures and Uses Extending Over or Beyond the Normal High-
Water Line of a Water Body or within a Wetland, and Shoreline Stabilization
1. No more than one pier, dock, wharf or similar structure extending or located below the normal high-
water line of a water body or within a wetland is allowed on a single lot: except that when a single lot
contains at least twice the minimum shore frontage as specified in Section 15(A), a second structure
may be allowed and may remain as long as the lot is not further divided.
Shoreland Zoning Ordinance
Town of Warren
17
2. Access from shore shall be developed on soils appropriate for such use and constructed so as to control
erosion.
3. The location shall not interfere with existing developed or natural beach areas.
4. The facility shall be located so as to minimize adverse effects on fisheries.
5. The facility shall be no larger in dimension than necessary to carry on the activity and be consistent
with existing conditions, use, and character of the area. A temporary pier, dock or wharf in non-tidal
waters shall not be wider than six (6) feet for non-commercial uses.
6. No new structure shall be built on, over or abutting a pier, wharf, dock or other structure extending
beyond the normal high-water line of a water body or within a wetland unless the structure requires
direct access to the water as an operational necessity.
NOTE: A structure constructed on a float or flats is prohibited unless it is designed to function as, and is
registered with the Maine Department of Inland Fisheries and Wildlife as a watercraft.
7. New permanent piers and docks on non-tidal waters shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a permit has
been obtained from the Department of Environmental Protection, pursuant to the Natural Resources
Protection Act.
8. No existing structures built on, over or abutting a pier, dock, wharf or other structure extending beyond
the normal high-water line of a water body or within a wetland shall be converted to residential
dwelling units in any district.
9. Except in the General Development District and Commercial Fisheries/Maritime Activities District,
structures built on, over or abutting a pier, wharf, dock or other structure extending beyond the normal
high-water line of a water body or within a wetland shall not exceed twenty (20) feet in height above
the pier, wharf, dock or other structure.
10. Vegetation may be removed in excess of the standards in Section 15(P) of this Ordinance in order to
conduct shoreline stabilization of an eroding shoreline, provided that a permit is obtained from the
Planning Board. Construction equipment must access the shoreline by barge when feasible as
determined by the Planning Board.
a. When necessary, the removal of trees and other vegetation to allow for construction equipment
access to the stabilization site via land must be limited to no more than 12 feet in width. When
the stabilization project is complete the construction equipment access way must be restored.
b. Revegetation must occur in accordance with Section 15(S).
NOTE: A permit pursuant to the Natural Resources Protection Act is required from the Department of
Environmental Protection for Shoreline Stabilization activities.
NOTE: A municipality may adopt a provision such as paragraph 11 below to allow the construction of decks
over a river in a downtown revitalization project, in accordance with 38 MRSA §439-A(4-B).
Shoreland Zoning Ordinance
Town of Warren
18
11. A deck over a river may be exempted from the Shoreland setback requirements if it is part of a
downtown revitalization project that is defined in a project plan approved by the legislative body of
the municipality, and may include the revitalization of structures formerly used as mills that do not
meet the structure setback requirements, if the deck meets the following requirements:
a. The total deck area attached to the structure does not exceed 700 square feet;
b. The deck is cantilevered over a segment of a river that is located within the boundaries of the
downtown revitalization project;
c.
The deck is attached to or accessory to an allowed commercial use in a structure that was that was
constructed prior to 1971 and is located within the downtown revitalization project;
d. The construction of the deck complies with all applicable standards, except the shoreline setback
requirements in Section 15(B); and
e. The construction of the deck complies with all other state and federal laws.
NOTE: New permanent structures, and expansions thereof, projecting into or over water bodies shall
require a permit from the Department of Environmental Protection pursuant to the Natural Resources
Protection Act, 38 MRSA Section 480-C. Permits may also be required from the Army Corps of Engineers if
located in navigable waters.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State licensing
procedures and the following:
1. Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not including roads
and driveways, for each site. Land supporting wetland vegetation and land below the normal high-
water line of a water body shall not be included in calculating land area per site.
2. The areas intended for placement of a recreational vehicle, tent or shelter, and utility and service
buildings shall be set back a minimum of one hundred (100) feet, horizontal distance, from the normal
high-water line of a great pond classified GPA or a river flowing to a great pond classified GPA, and
seventy-five (75) feet, horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds are permitted
provided the following conditions are met:
1. One campsite per lot existing on the effective date of this Ordinance, or forty thousand (40,000) square
feet of lot area within the shoreland zone, whichever is less, may be permitted.
2. When an individual private campsite is proposed on a lot that contains another principal use and/or
structure, the lot must contain the minimum lot dimensional requirements for the principal structure
and/or use, and the individual private campsite separately.
3. Campsite placement on any lot, including the area intended for a recreational vehicle or tent platform,
shall be set back one hundred (100) feet, horizontal distance, from the normal high-water line of a
great pond classified GPA or river flowing to a great pond classified GPA, and seventy-five (75) feet,
Shoreland Zoning Ordinance
Town of Warren
19
horizontal distance, from the normal high-water line of other water bodies, tributary streams, or the
upland edge of a wetland.
4. Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall not be
located on any type of permanent foundation except for a gravel pad, and no structure(s) except a
canopy shall be attached to the recreational vehicle.
5. The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a Resource
Protection District shall be limited to one thousand (1000) square feet.
6. A written sewage disposal plan describing the proposed method and location of sewage disposal shall
be required for each campsite and shall be approved by the Local Plumbing Inspector. Where disposal
is off-site, written authorization form the receiving facility or land owner is required.
7. When a recreational vehicle, tent or similar shelter is placed on-site for more than one hundred twenty
(120) days per year, all requirements for residential structures shall be met, including the installation
of a subsurface sewage disposal system in compliance with the State of Maine Subsurface Wastewater
Disposal Rules unless served by public sewage facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial uses are prohibited within
the shoreland zone adjacent to great ponds classified GPA, and rivers, and streams which flow to great
ponds classified GPA:
1. Auto washing facilities;
2. Auto or other vehicle service and/or repair operations, including body shops;
3. Chemical and bacteriological laboratories;
4. Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts normally
associated with individual households or farms;
5. Commercial painting, wood preserving, and furniture stripping;
6. Dry cleaning establishments;
7. Electronic circuit assembly;
8. Laundromats, unless connected to a sanitary sewer;
9. Metal plating, finishing or polishing;
10. Petroleum or petroleum product storage and/or sale, except for storage on same property as use
occurs and except for storage and sales associated with marinas;
11. Photographic processing; and
12. Printing.
G. Parking Areas.
1. Parking areas shall meet the shoreline and tributary stream setback requirements for structures for the
district in which such areas are located, except that in the Commercial Fisheries/Maritime Activities
District parking areas shall be set back at least twenty-five (25) feet, horizontal distance, from the
shoreline. The setback requirement for parking areas serving public boat launching facilities in Districts
other than the General Development I District and Commercial Fisheries/Maritime Activities District
shall be no less than fifty (50) feet, horizontal distance, from the shoreline or tributary stream if the
Planning Board finds that no other reasonable alternative exists further from the shoreline or tributary
stream.
Shoreland Zoning Ordinance
Town of Warren
20
2. Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and, where
feasible, to retain all runoff on-site.
3. In determining the appropriate size of proposed parking facilities, the following shall apply:
a. Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long, except that
parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
b. Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads. The following standards shall apply to the construction of roads and/or driveways and drainage
systems, culverts and other related features.
1. Roads and driveways shall be set back at least one hundred (100) feet, horizontal distance, from the
normal high-water line of a great pond classified GPA or a river that flows to a great pond classified
GPA and seventy-five (75) feet, horizontal distance from the normal high-water line of other water
bodies, tributary streams or the upland edge of a wetland unless no reasonable alternative exists as
determined by the Planning Board. If no other reasonable alternative exists, the road and/or driveway
setback requirement shall be no less than fifty (50) feet, horizontal distance, upon clear showing by the
applicant that appropriate techniques will be used to prevent sedimentation of the water body,
tributary stream, or wetland. Such techniques may include, but are not limited to, the installation of
settling basins, and/or the effective use of additional ditch relief culverts and turnouts placed so as to
avoid sedimentation of the water body, tributary stream or wetland.
On slopes of greater than twenty (20) percent, the road and/or driveway setback shall be increased by
ten (10) feet, horizontal distance, for each five (5) percent increase in slope above twenty (20) percent.
Section 15(H)(1) does not apply to approaches to water crossings or to roads or driveways that provide
access to permitted structures and facilities located nearer to the shoreline or tributary stream due to
an operational necessity, excluding temporary docks for recreational uses. Roads and driveways
providing access to permitted structures within the setback area shall comply fully with the
requirements of Section 15(H)(1) except for that portion of the road or driveway necessary for direct
access to the structure.
2. Existing public roads may be expanded within the legal road right-of-way regardless of their setback
from a water body.
3. New permanent roads are not allowed within the shoreland zone along Significant River Segments
except:
a. To provide access to structures or facilities within the zone; or
b. When the applicant demonstrates that no reasonable alternative route exists outside the shoreland
zone. When roads must be located within the shoreland zone they shall be set back as far as
practicable from the normal high-water line and screened from the river by existing vegetation.
4. New roads and driveways are prohibited in a Resource Protection District except that the Planning
Board may grant a permit to construct a road or driveway to provide access to permitted uses within
Shoreland Zoning Ordinance
Town of Warren
21
the district. A road or driveway may also be approved by the Planning Board in a Resource Protection
District, upon a finding that no reasonable alternative route or location is available outside the district.
When a road or driveway is permitted in a Resource Protection district, the road and/or driveway shall
be set back as far as practicable from the normal high-water line of a water body, tributary stream, or
upland edge of a wetland.
5. Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1) vertical, and
shall be graded and stabilized in accordance with the provisions for erosion and sedimentation control
contained in Section 15(T).
6. Road and driveway grades shall be no greater than ten (10) except for segments of less than two
hundred (200) feet.
7. In order to prevent road and driveway surface drainage from directly entering water bodies, tributary
streams or wetlands, roads and driveways shall be designed, constructed, and maintained to empty
onto an unscarified buffer strip at least fifty (50) feet plus two times the average slope, in width
between the outflow point of the ditch or culvert and the normal high-water line of a water body,
tributary stream, or upland edge of a wetland. Surface drainage which is directed to an unscarified
buffer strip shall be diffused or spread out to promote infiltration of the runoff and to minimize
channelized flow of the drainage through the buffer strip.
8. Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a manner
effective in directing drainage onto unscarified buffer strips before the flow gains sufficient volume or
head to erode the road, driveway or ditch. To accomplish this, the following shall apply:
a. Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along the road, or
driveway at intervals no greater than indicated in the following table:
Grade (Percent)
Spacing (Feet)
0-2
250
3-5
200 - 135
6-10
100 - 80
11-15
80 - 60
16-20
60 - 45
21+
40
b. Drainage dips may be used in place of ditch relief culverts only where the grade is ten (10) percent
or less.
c. On sections having slopes greater than ten (10), ditch relief culverts shall be placed at approximately
a thirty (30) degree angle downslope from a line perpendicular to the centerline of the road or
driveway.
d. Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for effective
functioning, and their inlet and outlet ends shall be stabilized with appropriate materials.
Shoreland Zoning Ordinance
Town of Warren
22
9. Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control installations
associated with roads and driveways shall be maintained on a regular basis to assure effective
functioning.
I.
Signs. The following provisions shall govern the use of signs in the Resource Protection, Stream Protection,
Limited Residential and Limited Commercial Districts:
1. Signs relating to goods and services sold on the premises shall be allowed, provided that such signs
shall not exceed six (6) square feet in area and shall not exceed two (2) signs per premises. In the
Limited Commercial District, however, such signs shall not exceed sixteen (16) square feet in area. Signs
relating to goods or services not sold or rendered on the premises shall be prohibited.
2. Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and shall not
exceed twelve (12) square feet in the aggregate.
3. Residential users may display a single sign not over three (3) square feet in area relating to the sale,
rental or lease of the premises.
4. Signs, relating to trespassing and hunting shall be permitted without restriction as to number provided
that no such sign shall exceed two (2) square feet in area.
5. Signs relating to public safety shall be permitted without restriction.
6. No sign shall extend higher than twenty (20) feet above the ground.
7. Signs may be illuminated only by shielded, non-flashing lights.
J.
Stormwater Runoff
1. All new construction and development shall be designed to minimize storm water runoff from the site
in excess of the natural predevelopment conditions. Where possible, existing natural runoff control
features, such as berms, swales, terraces and wooded areas, shall be retained in order to reduce runoff
and encourage infiltration of stormwaters.
2. Storm water runoff control systems shall be maintained as necessary to ensure proper functioning.
K. Septic Waste Disposal
1. All subsurface sewage disposal systems shall be installed in conformance with the State of Maine
subsurface Wastewater Disposal Rules and the following: a) clearing or removal of woody vegetation
necessary to site a new system and any associated fill extensions shall not extend closer than one
hundred (100) feet, horizontal distance, from the normal high-water line of a water body or the upland
edge of a wetland; and b) a holding tank is not allowed from a first-time residential use in the shoreland
zone.
NOTE: The Maine subsurface Wastewater Disposal Rules require new systems, excluding fill extensions, to
be constructed no less than one hundred (100) horizontal feet from the normal high-water line of a
perennial water body. The minimum setback distance for a new subsurface disposal system may not be
reduced by variance.
Shoreland Zoning Ordinance
Town of Warren
23
L.
Essential Services
1. Where feasible, the installation of essential services shall be limited to existing public ways and existing
service corridors.
2. The installation of essential services, other than road-side distribution lines, is not allowed in a
Resource Protection or Stream Protection District, except to provide services to a permitted use within
said district, or except where the applicant demonstrates that no reasonable alternative exists. Where
allowed, such structures and facilities shall be located so as to minimize any adverse impacts on
surrounding uses and resources, including visual impacts.
3. Damaged or destroyed public utility transmission and distribution lines, towers and related equipment
may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of mineral
resources shall be accomplished by hand sampling, test boring, or other methods which create minimal
disturbance of less than one hundred (100) square feet of ground surface. A permit from the Code
Enforcement Officer shall be required. All excavations, including test pits and holes, shall be immediately
capped, filled or secured by other equally effective measures to restore disturbed areas and to protect the
public health and safety.
Mineral extraction may be permitted under the following conditions:
1. A reclamation plan shall be filed with, and approved, by the Planning Board before a permit is granted.
Such plan shall describe in detail procedures to be undertaken to fulfill the requirements of Section
15(M)(4) below.
2. No part of any extraction operation, including drainage and runoff control features, shall be permitted
within one hundred (100) feet, horizontal distance, of the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and within seventy-five (75) feet,
horizontal distance, of the normal high-water line of any other water body, tributary stream, or the
upland edge of a wetland. Extraction operations shall not be permitted within seventy-five (75) feet,
horizontal distance, of any property line without written permission of the owner of such adjacent
property.
3. Developers of new gravel pits along Significant River Segments shall demonstrate that no reasonable
mining site outside the shoreland zone exists. When gravel pits must be located within the zone, they
shall be set back as far as practicable from the normal high-water line and no less than seventy-five
(75) feet and screened from the river by existing vegetation.
4. Within twelve (12) months following the completion of extraction operations at any extraction site,
which operations shall be deemed complete when less than one hundred (100) cubic yards of materials
are removed in any consecutive twelve (12) month period, ground levels and grades shall be
established in accordance with the following:
a. All debris, stumps, and similar material shall be removed for disposal in an approved location, or
shall be buried on-site. Only materials generated on-site may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 MRSA Section 1301, and the solid waste management
rules, Chapters 400-419 of the Department of Environmental Protection's regulations, may contain other
Shoreland Zoning Ordinance
Town of Warren
24
applicable provisions regarding disposal of such materials.
b. The final graded slope shall be two and one-half to one (2 ½ : 1) slope or flatter.
c. Top soil or loam shall be retained to cover all disturbed land areas, which shall be reseeded and
stabilized with vegetation native to the area. Additional topsoil or loam shall be obtained from off-
site sources if necessary to complete the stabilization project.
5. In keeping with the purposes of this Ordinance, the Planning Board may impose such conditions as are
necessary to minimize the adverse impacts associated with mineral extraction operations on
surrounding uses and resources.
N. Agriculture
1. All spreading of manure shall be accomplished in conformance with the Manure Utilization Guidelines
published by the former Maine Department of Agriculture on November 1, 2001, and the Nutrient
Management Law (7 MRSA Sections 4201-4209).
2. Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance, of a great
pond classified GPA or a river flowing to a great pond classified GPA, or within seventy-five (75) feet,
horizontal distance, of other water bodies, tributary streams, or wetlands. All manure storage areas
within the shoreland zone must be constructed or modified such that the facility produces no discharge
of effluent or contaminated storm water.
3. Agricultural activities involving tillage of soil greater than forty thousand (40,000) square feet in surface
area within the shoreland zone shall require a Conservation Plan to be filed with the Planning Board.
Non-conformance with the provisions of said plan shall be considered to be a violation of this
Ordinance
NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and Water
Conservation District office.
4. There shall be no new tilling of soil within one hundred (100) feet, horizontal distance, of the normal
high-water line of a great pond classified GPA; within seventy-five (75) feet, horizontal distance, from
other water bodies and coastal wetlands; nor within twenty-five (25) feet, horizontal distance, of
tributary streams and freshwater wetlands. Operations in existence on the effective date of this
ordinance and not in conformance with this provision may be maintained.
5. Newly established livestock grazing areas shall not be permitted within one hundred (100) feet,
horizontal distance, of the normal high-water line of a great pond classified GPA; within seventy-five
(75) feet, horizontal distance, of other water bodies and coastal wetlands; nor within twenty-five (25)
feet, horizontal distance, of tributary streams and freshwater wetlands. Livestock grazing associated
with ongoing farm activities, and which are not in conformance with the above setback provisions may
continue, provided that such grazing is conducted in accordance with a Conservation Plan that has been
filed with the planning board.
NOTE: 7 MRSA, Section 155 requires a municipality to provide the Commissioner of Agriculture,
Conservation and Forestry with a copy of any proposed ordinance that impacts farm operations. The law
further requires the Commissioner to review the proposed ordinance and advise the municipality if the
Shoreland Zoning Ordinance
Town of Warren
25
proposed ordinance would restrict or prohibit the use of best management practices. A copy of a shoreland
zoning ordinance that regulates no more restrictively than contained in these Guidelines need not be
provided to the Commissioner of Agriculture, Food and Rural Resources.
NOTE RELATING TO TIMBER HARVESTING STANDARDS
Title 38 MRSA Section 438-A provides that, notwithstanding other provisions of the Mandatory Shoreland Zoning
Act, the regulation of timber harvesting and timber harvesting activities in shoreland areas, must be in
accordance with Section 438-B and rules adopted by the Maine Forest Bureau pursuant to Title 12, Section 8867-
B. Section 438-B establishes three options from which each municipality may choose as the State implements a
set of statewide timber harvesting standards in shoreland areas.
Option 1: The first option available to a municipality is the complete repeal of timber harvesting provisions from
the shoreland zoning ordinance. Under this option the Bureau of Forestry will administer the regulation of all
forestry activities within the municipality. Section 438-B(2) states:
A municipality may choose to have the statewide standards apply to timber harvesting and timber harvesting
activities in that municipality by authorizing the repeal of all provisions within the municipal shoreland zoning
ordinance that regulate timber harvesting and timber harvesting activities in shoreland areas and notifying the
(Director of the Bureau of Forestry within the Department of Agriculture, Conservation and Forestry) of the
repeal. The authorization must specify a repeal date. When a municipality accepts the statewide standards in
accordance with this subsection, the Director of the Bureau of Forestry shall administer and enforce the
statewide standards within that municipality beginning on January 1, 2013 or the municipal repeal date specified
in the notification received under this subsection.
Section 438-B(6) provides that, notwithstanding any provision in a local ordinance to the contrary, beginning
January 1, 2013 rules adopted by the Bureau of Forestry under Title 12, Section 8867-B will apply in all
municipalities that have accepted the statewide standards in accordance with Option 1.
If a municipality chooses option 1, completely repealing the municipal regulation of timber harvesting activities
in the shoreland zone and deferring the regulation of timber harvesting activities to the Bureau of Forestry, the
repeal should include all references to timber harvesting regulations, including:
1. Section 14, Table 1, Land Uses in the Shoreland Zone, Item 3 (forest management activities except for timber
harvesting & land management roads), Item 4 (timber harvesting), and Item 27 (land management roads) of
the Table;
2. Section 15(O) in its entirety (Section 15(O-1) would not have been adopted by those municipalities that had
elected to retain section 15(O), so there would be no need to repeal section 15(O-1); and
3. All definitions in Section 17 pertaining to timber harvesting and forest management activities, including the
terms: Cross-sectional area, DBH, Disruption of shoreline integrity, Forest management activities, forest
stand, harvest area, land management road, licensed forester, residual basal area, residual stand, skid road
or skid trail, slash, timber harvesting and related activities and wind firm.
Option 2: The second option available to the municipality is the adoption of timber harvesting standards that are
identical to the statewide standards. This option allows the municipality to retain some local control over the
administration and enforcement of timber harvesting in the shoreland zone, while receiving assistance and
expertise from staff of the Bureau of Forestry. Section 438-B(3) states:
Shoreland Zoning Ordinance
Town of Warren
26
A municipality may adopt an ordinance to regulate timber harvesting and timber harvesting activities that is
identical to the statewide standards. A municipality that adopts an ordinance under this subsection may request
the director (of the Bureau of Forestry) to administer and enforce the ordinance or to participate in joint
administration and enforcement of the ordinance with the municipality beginning on the effective date of the
statewide standards (January 1, 2013) or within 60 days of the director's receiving a request. When a
municipality requests joint responsibilities, the director and the municipality shall enter into an agreement that
delineates the administrative and enforcement duties of each. To continue to receive administrative and
enforcement assistance from the (Bureau of Forestry) under this subsection, a municipality must amend its
ordinance as necessary to maintain identical provisions with the statewide standards.
Section 438-B(6) provides that, notwithstanding any provision in a local ordinance to the contrary, beginning
January 1, 2013 rules adopted by the Bureau of Forestry under Title 12, Section 8867 will apply in all
municipalities that have adopted an ordinance identical to the statewide standards in accordance with Option 2.
For those municipalities that choose option 2, these Guidelines contain timber harvesting standards that are
based on the June 15, 2005 Bureau of Forestry Chapter 21 statewide standards (Section 15.O-1). Provisions for
culvert sizing in this section 15.O-1 have been updated to comply with current NRPA standards, and a reference
to Bureau of Forestry definitions for terms used in this section has been added. However, before a municipality
adopts or amends this section they should consult with the Bureau of Forestry to get the latest version of Chapter
21. A municipality amending their own forestry standards, whether under Option 2 or Option 3, is required to
coordinate with the Bureau of Forestry through the Title 12, section 8869, subsection 8 process to ensure that
any local amendments are consistent with the statewide standards in effect at the time of the local ordinance
amendments.
Option 3: The third option available to the municipality is to retain its current timber harvesting standards. Section
438-B(4) states:
A municipal ordinance regulating timber harvesting and timber harvesting activities that is in effect and
consistent with state laws and rules in effect on December 31, 2005 continues in effect unless action is taken in
accordance with (Option 1 or Option 2 above). A municipality that retains an ordinance with provisions that
differ from the statewide standards shall administer and enforce that ordinance - unless the municipality
requests that the director (of the Bureau of Forestry) administer and enforce the ordinance and the director
agrees with the request after reviewing the ordinance. The director may not administer or enforce any ordinance
that is more stringent than or significantly different from the requirements of section 438-B(3). A municipality
may not amend a municipal ordinance regulating timber harvesting and timber harvesting activities unless the
process established in Title 12, section 8869, subsection 8 is followed. Beginning on (January 1, 2013), a
municipality may not amend an ordinance regulating timber harvesting and timber harvesting activities in a
manner that results in standards that are less stringent than or otherwise conflict with the statewide standards
(Section 438-B(4).
Option 3 municipalities may also amend their timber harvesting ordinances in accordance with Section 15.O-1,
but before a municipality amends their ordinance they should consult with the Bureau of Forestry to get the
latest version of Chapter 21. A municipality amending their forestry standards, whether under Option 2 or Option
3, is required to coordinate with the Bureau of Forestry through the Title 12, section 8869, subsection 8 process
to ensure that any local amendments are consistent with the statewide standards in effect at the time of the
local ordinance amendments.
Shoreland Zoning Ordinance
Town of Warren
27
O-1.
Timber Harvesting - Statewide Standards
1. Shoreline integrity and sedimentation. Persons conducting timber harvesting and related activities
must take reasonable measures to avoid the disruption of shoreline integrity the occurrence of
sedimentation of water, and the disturbance of water body and tributary stream banks, water body
and tributary stream channels, shorelines, and soil lying within water bodies, tributary streams and
wetlands. If, despite such precautions, the disruption of shoreline integrity, sedimentation of water,
or the disturbance of water body and tributary stream banks, water body and tributary stream
channels, shorelines and soil lying within water bodies, tributary streams and wetlands occurs, such
conditions must be corrected.
2. Slash treatment. Timber harvesting and related activities shall be conducted such that slash or debris
is not left below the normal high-water line of any water body or tributary stream, or the upland edge
of a wetland. Section 15(O-1)(2) does not apply to minor, incidental amounts of slash that result from
timber harvesting and related activities otherwise conducted in compliance with this section.
a. Slash actively used to protect soil from disturbance by equipment or to stabilize exposed soil, may
be left in place, provided that no part thereof extends more than four (4) feet above the ground.
b. Adjacent to great ponds, rivers and wetlands:
i. No accumulation of slash shall be left within fifty (50) feet, horizontal distance, of the normal
high-water line or upland edge of a wetland; and
ii. Between 50 feet and 250 feet, horizontal distance, of the normal high-water line or upland
edge of a wetland, all slash larger than 3 inches in diameter must be disposed of in such a
manner that no part thereof extends more than 4 feet above the ground.
3. Timber harvesting and related activities must leave adequate tree cover and shall be conducted so that
a well-distributed stand of trees is retained. This requirement may be satisfied by following one of the
following three options:
a. Option 1 (40% volume removal), as follows:
i. Harvesting of no more than 40 percent of the total volume on each acre of trees 4.5 inches
DBH or greater in any 10 year period is allowed. Volume may be considered to be equivalent
to basal area;
ii. A well-distributed stand of trees which is windfirm, and other vegetation including existing
ground cover, must be maintained; and,
iii. Within 75 feet, horizonal distance, of the normal high-water line of rivers, streams, and
great ponds, and within 75 feet, horizontal distance, of the upland edge of a freshwater or
coastal wetlands, there must be no cleared openings. At distances greater than 75 feet,
horizontal distance, of the normal high-water line of a river or great pond or upland edge of
a wetland, timber harvesting and related activities must not create single cleared great
ponds, and within 75 feet, horizontal distance, of the upland edge of a freshwater or coastal
wetlands, there must be no cleared openings. At distances greater than 75 feet, horizontal
Shoreland Zoning Ordinance
Town of Warren
28
distance, of the normal high-water line of a river or great pond or upland edge of a wetland,
timber harvesting and related activities must not create single cleared openings greater
than 14,000 square feet in the forest canopy. Where such openings exceed 10,000 square
feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings will
be included in the calculation of total volume removal. Volume may be considered
equivalent to basal area.
b. Option 2 (60 square foot basal area retention), as follows:
i. The residual stand must contain an average basal area of at least 60 square feet per acre of
woody vegetation greater than or equal to 1.0-inch DBH, of which 40 square feet per acre
must be greater than or equal to 4.5 inches DBH;
ii. A well-distributed stand of trees which is windfirm, and other vegetation including existing
ground cover, must be maintained; and,
iii. Within 75 feet, horizontal distance, of the normal high-water line of water bodies and within
75 feet, horizontal distance, of the upland edge of wetlands, there must be no cleared
openings. At distances greater than 75 feet, horizontal distance of the normal high-water
line of a river or great pond, or upland edge of a wetland, timber harvesting and related
activities must not create single cleared openings greater than 14,000 square feet in the
forest canopy. Where such openings exceed 10,000 square feet, they must be at least 100
feet, horizontal distance, apart. Such cleared openings will be included in the calculation of
the average basal area. Volume may be considered equivalent to basal area.
c.
Option 3 (outcome based), which requires: An alternative method proposed in an application,
signed by a Licensed Forester or certified wildlife professional, submitted by the landowner or
designated agent to the State of Maine Department of Conservation's Bureau of Forestry (Bureau)
for review and approval, which provides equal or better protection of the shoreland area than this
rule.
Landowners must designate on the Forest Operations Notification form required by 12 MRSA,
chapter 805, subchapter 5 which option they choose to use. If landowners choose Option 1 or
Option 2, compliance will be determined solely on the criteria for the option chosen. If landowners
choose Option 3, timber harvesting and related activities may not begin until the Bureau has
approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is retained
through a field procedure that uses sample plots that are located randomly or
4. Skid trails, yards, and equipment operation. This requirement applies to the construction,
maintenance and use of skid trails and yards in shoreland areas.
a. Equipment used in timber harvesting and related activities shall not use river, stream or tributary
stream channels as travel routes except when surface waters are frozen and snow covered, and
the activity will not result in any ground disturbance.
Shoreland Zoning Ordinance
Town of Warren
29
b. Skid trails and yards must be designed and constructed to prevent sediment and concentrated
water runoff from entering a water body, tributary stream, or wetland. Upon termination of their
use, skid trails and yards must be stabilized.
c.
Setbacks:
i. Equipment must be operated to avoid the exposure of mineral soil within 25 feet, horizontal
distance, of any water body, tributary stream, or wetland. On slopes of 10 percent or
greater, the setback for equipment operation must be increased by 20 feet, horizontal
distance, plus an additional 10 feet, horizontal distance, for each 5 percent increase in slope
above 10 percent. Where slopes fall away from the resource, no increase in the 25-foot
setback is required.
ii. Where such setbacks are impracticable, appropriate techniques shall be used to avoid
sedimentation of the water body, tributary stream or wetland. Such techniques may
include the installation of sump holes or settling basins, and/or the effective use of
additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of
the water body, tributary stream or wetland. If, despite such precautions, sedimentation
or the disruption of shoreline integrity occurs, such conditions must be corrected.
5. Land Management Roads. Land management roads, including approaches to crossings of water
bodies, tributary stream channels, and freshwater wetlands, ditches and other related structures, must
be designed, constructed and maintained to prevent sediment and concentrated water runoff from
directly entering the water body, tributary stream or wetland. Surface water on or adjacent to water
crossing approaches must be diverted through vegetative filter strips to avoid sedimentation of the
watercourse or wetland. Because roadside ditches may not extend to the resource being crossed,
vegetative filter strips must be established in accordance with the setback requirements in Section 15
(O-1)(7) of this rule.
a. Land management roads and associated ditches, excavation, and fill must be set back at least:
i. 100 feet, horizontal distance, from the normal high-water line of a great pond, river or
freshwater or coastal wetland;
ii. 50 feet, horizontal distance, from the normal high-water line of streams; and
iii. 25 feet, horizontal distance, from the normal high-water line of tributary streams.
b. The minimum 100 foot setback specified in Section 15 (O-1)(5)(a)(i) above may be reduced to no
less than 50 feet, horizontal distance, and the 50 foot setback specified in Section 15(O-1)(5)(a)(ii)
above may be reduced to no less than 25 feet, horizontal distance, if, prior to construction, the
landowner or the land owner's designated agent demonstrates to the Planning Board's satisfaction
that no reasonable alternative exists and that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may include, but
are not limited to, the installation of settling basins and/or the effective use of additional ditch
Shoreland Zoning Ordinance
Town of Warren
30
relief culverts and runouts placed to avoid sedimentation of the water body, tributary stream or
wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
c.
On slopes of 10 percent or greater, the land management road setback must be increased by at
least 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent
increase in slope above 10 percent.
d. New land management roads are not allowed within the shoreland area along Significant River
Segments as identified in 38 MRSA, section 437, nor in a Resource Protection District, unless, prior
to construction, the landowner or the landowner's designated agent makes a clear demonstration
to the Planning Board's satisfaction that no reasonable alternative route exists outside the
shoreland zone, and that the new road must be set back as far as practicable from the normal high-
water line and screened from the river by existing vegetation.
e. Ditches, culverts, bridges, dips, water turnouts and other water control installations associated
with roads must be maintained on a regular basis to assure effective functioning. Drainage
structures shall deliver a dispersed flow of water into an unscarified filter strip no less than the
width indicated in the setback requirements in Section 14(O-1)(7). Where such a filter strip is
impracticable, appropriate techniques shall be used to avoid sedimentation of the water body,
tributary stream, or wetland. Such techniques may include the installation of sump holes or
settling basins, and/or the effective use of additional ditch relief culverts and ditch water turnouts
placed to avoid sedimentation of the water body, tributary stream, or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must
be corrected.
f.
Road closeout and discontinuance. Maintenance of the water control installations required in
Section 15(O-1)(5)(e) must continue until use of the road is discontinued and the road is put to bed
by effective installation of water bars or other adequate road drainage structures at appropriate
intervals, constructed to avoid surface water flowing over or under the water bar, and extending
a sufficient distance beyond the traveled way so that water does not reenter the road surface.
g.
Upgrading existing roads. Extension or enlargement of presently existing roads must conform to
the provisions of Section 15(O-1). Any nonconforming existing road may continue to exist and to
be maintained, as long as the nonconforming conditions are not made more nonconforming.
h. Exception. Extension or enlargement of presently existing roads need not conform to the setback
requirements of Section 15(O-1)(5)(a) if, prior to extension or enlargement, the landowner or the
landowner's designated agent demonstrates to the Planning Board's satisfaction that no
reasonable alternative exists and that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may include, but
are not limited to the installation of settling basins, and/or the effective use of additional ditch
relief culverts and turnouts placed to avoid sedimentation of the water body, tributary stream or
wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
Shoreland Zoning Ordinance
Town of Warren
31
i.
Additional measures. In addition to the foregoing minimum requirements, persons undertaking
construction and maintenance of roads and river, stream and tributary stream crossings must take
reasonable measures to avoid sedimentation of surface waters.
6. Crossings of waterbodies. Crossings of rivers, streams, and tributary streams must allow for fish
passage at all times of the year, must not impound water, and must allow for the maintenance of
normal flows.
a. Determination of flow. Provided they are properly applied and used for the circumstances for
which they are designed, methods including but not limited to the following are acceptable as a
means of calculating the 10 year and 25-year frequency water flows and thereby determining
water crossing sizes as required in Section 15(O-1): The United States Geological Survey (USGS)
Methods; specifically: Hodgkins, G. 1999. Estimating the Magnitude of Peak Flows for Streams in
Maine for Selected Recurrence Intervals. U.S. Geological Survey. Water Resources Investigations
Report 99-4008. 45 pp.
b. Upgrading existing water crossings. Extension or enlargement of presently existing water
crossings must conform to the provisions of Section 15(O-1). Any nonconforming existing water
crossing may continue to exist and be maintained, as long as the nonconforming conditions are
not made more nonconforming: however, any maintenance or repair work done below the normal
high-water line must conform to the provisions of Section 15(O-1).
c.
Other Agency Permits. Any timber harvesting and related activities involving the design,
construction, and maintenance of crossings on waterbodies other than a river, stream or tributary
stream may require a permit from the Land Use Regulation Commission, the Department of
Environmental Protection or the US Army Corps of Engineers.
d. Any timber harvesting and related activities involving the design, construction and maintenance
of crossings of freshwater wetlands identified by the Department of Inland Fisheries and Wildlife
as essential wildlife habitat require prior consultation with the Department of Inland Fisheries and
wildlife.
e. Notice to Bureau of Forestry. Written notice of all water crossing construction maintenance
alteration and replacement activities in shoreland areas must be given to the Bureau prior to the
commencement of such activities. Such notice must contain all information required by the
Bureau, including:
i. A map showing the location of all proposed permanent
ii. The GPS location of all proposed permanent crossings;
iii. For any temporary or permanent crossing that requires a permit from state or federal
agencies, a copy of the approved permit or permits; and
iv. A statement signed by the responsible party that all temporary and permanent crossings
will be constructed, maintained and closed out in accordance with the requirements of this
Section.
Shoreland Zoning Ordinance
Town of Warren
32
f.
Water crossing standards. All crossings of rivers require a bridge or culvert sized according to the
requirements of Section 15(O-1)(6)(g) below. Streams and tributary streams may be crossed using
temporary structures that are not bridges or culverts provided:
i. Concentrated water runoff does not enter the stream or tributary stream;
ii. Sedimentation of surface waters is reasonably avoided;
iii. There is no substantial disturbance of the bank, or stream or tributary stream channel;
iv. Fish passage is not impeded; and,
v. Water flow is not unreasonably impeded.
Subject to Section 15(O-1)(6)(f)(i-v) above, skid trail crossings of streams and tributary streams
when channels of such streams and tributary streams are frozen and snow-covered or are
composed of a hard surface which will not be eroded or otherwise damaged are not required to
use permanent or temporary structures.
g.
Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels with a
bridge or culvert, the following requirements apply:
i. Bridges and culverts must be installed and maintained to provide an opening sufficient in
size and structure to accommodate 25-year frequency water flows or with a cross-sectional
area at least equal to 3 times the cross-sectional area of the river, stream or tributary stream
channel.
ii. Temporary bridge and culvert sizes may be smaller than provided in Section 15(O-1)(6)(g)(i)
if techniques are effectively employed such that in the event of culvert or bridge failure, the
natural course of water flow is maintained and sedimentation of the water body or tributary
stream is avoided. Such crossing structures must be at least as wide as the channel and
placed above the normal high-water line. Techniques may include, but are not limited to,
the effective use of any, a combination of, or all of the following:
1. Use of temporary skidder bridges;
2. Removing culverts prior to the onset of frozen ground conditions;
3. Using water bars in conjunction with culverts;
4. Using road dips in conjunction with culverts.
iii. Culverts utilized in river, stream and tributary stream crossings must:
1. Be installed at or below river, stream or tributary stream bed elevation;
2. Be seated on firm ground;
Shoreland Zoning Ordinance
Town of Warren
33
3. Have soil compacted at least halfway up the side of the culvert;
4. Be covered by soil to a minimum depth of 1 food or according to the culver
manufacturer's specifications, whichever is greater; and
5. Have a headwall at the inlet end which is adequately stabilized by riprap or other
suitable means to reasonably avoid erosion of material around the culvert.
iv. River, stream and tributary stream crossings allowed under Section 15(O-1), but located in
flood hazard areas (i.e. A zones) as identified on a community's Flood Insurance Rate Maps
(FIRM) or Flood Hazard Boundary Maps (FHBM), must be designed and constructed under
the stricter standards contained in that community's National Flood Insurance Program
(NFIP). For example, a water crossing may be required to pass a 100-year flood event.
v. Exception. Skid trail crossings of tributary streams within shoreland areas and wetlands
adjacent to such streams may be undertaken in a manner not in conformity with the
requirements of the foregoing subsections provided persons conducting such activities take
reasonable measures to avoid the disruption of shoreline integrity, the occurrence of
sedimentation of water, and the disturbance of stream banks, stream channels, shorelines,
and soil lying within ponds, and wetlands. If, despite such precautions, the disruption of
shoreline integrity, sedimentation of water, or the disturbance of stream banks, stream
channels, shorelines and soil lying within ponds and wetlands occurs, such conditions must
be corrected.
h. Skid trail closeout. Upon completion of timber harvesting and related activities, or upon the
expiration of a Forest Operations Notification, whichever is earlier, the following requirements
apply:
i. Bridges and culverts installed for river, stream and tributary stream crossings by skid trails
must either be removed and areas of exposed soil stabilized, or upgraded to comply with
the closeout standards for land management roads in Section 15(O-1)(6)(i) below.
ii. Water crossing structures that are not bridges or culverts must either be removed
immediately following timber harvesting and related activities, or, if practical after snow
melt.
iii. River, stream and tributary stream channels, banks and approaches to crossings of water
bodies and tributary streams must be immediately stabilized on completion of harvest, or if
the ground is frozen and/or snow covered, as soon as practical after snow melt. If, despite
such precautions, sedimentation or the disruption of shoreline integrity occurs, such
conditions must be corrected.
Shoreland Zoning Ordinance
Town of Warren
34
i.
Land management road closeout. Maintenance of the water control features must continue until
use of the road is discontinued and the road is put to bed by taking the following actions:
i. Effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to reasonably avoid surface water flowing over or under
the water bard, and extending sufficient distance beyond the traveled way so that water
does not reenter the road surface.
ii. Water crossing structures must be appropriately sized or dismantled and removed in a
manner that reasonably avoids sedimentation of the water body or tributary stream.
iii. Any bridge or water crossing culvert in roads to be discontinued shall satisfy one of the
following requirements:
1. It shall be designed to provide an opening sufficient in size and structure to
accommodate 25-year frequency water flows;
2. It shall be designed to provide an opening with a cross-sectional area at least 3
½ times the cross-sectional area of the river, stream or tributary stream channel;
or
3. It shall be dismantled and remove din a fashion to reasonably avoid
sedimentation of the river, stream or tributary stream.
If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
7. Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained as specified
in Section 15(O-1), but in no case shall be less than shown in in the following table.
Average slope of land between exposed
Width of strip between exposed
Mineral soil and the shoreline (percent )
Mineral soil and shoreline
(feet along surface of the ground)
0
25
10
45
20
65
30
85
40
105
50
125
60
145
70
165
Shoreland Zoning Ordinance
Town of Warren
35
8. Definitions. Unless otherwise provided herein, this Section O-1 incorporates by reference the
definitions contained in the Maine Forest Service Rules Chapter 20, "Forest Regeneration and
Clearcutting Standards," and Chapter 21, "Statewide Standards for Timber Harvesting and Related
Activities in Shoreland Areas."
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
1. In a Resource Protection District abutting a great pond, there shall be no cutting of vegetation within
the strip of land extending seventy-five (75) feet, horizontal distance, inland from the normal high-
water line, except to remove hazard trees as described in Section Q.
Elsewhere in any Resource Protection District, the cutting or removal of vegetation shall be limited to
that which is necessary for uses expressly authorized in that district.
2. Except in areas as described in Section P (1), above, within a strip of land extending one hundred (100)
feet, horizontal distance, inland from the normal high-water line of a great pond classified GPA or a
river flowing to a great pond classified GPA, or within a strip extending seventy-five (75) feet, horizontal
distance, from any other water body, tributary stream, or the upland edge of a wetland, a buffer strip
of vegetation shall be preserved as follows:
a. There shall be no cleared opening greater than two hundred fifty (250) square feet in the forest
canopy (or other existing woody vegetation if a forested canopy is not present) as measured from
the outer limits of the tree or shrub crown. However, a single footpath not to exceed six (6) feet
in width as measured between tee trunks and/or shrub stems is allowed for accessing the shoreline
provided that a cleared line of sight to the water through the buffer strip is not created.
b. Selective cutting of trees within the buffer strip is allowed provided that a well distributed stand
of trees and other natural vegetation is maintained. For the purposes of Section 15(P)(2)(b), a
"well-distributed stand of trees" adjacent to a great pond classified GPA or a river or stream
flowing to a great pond classified GPA, shall be defined as maintaining a rating score of 24 or more
in each 25-foot by 50-foot rectangular (1,250 square feet) area as determined by the following
rating system.
Diameter of Tree at 4 ½ feet Above Ground Level (inches
Points
2 - < 4
1
4 - < 8
2
8 - < 12
4
12 or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well distributed stand of trees"
is defined as maintaining a minimum rating score of 16 per 25 foot by 50 foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25 foot x 50 foot plot contains four (4) trees between
2 and 4 inches in diameter, two trees between 4 and 8 inches in diameter, three trees between 8 and 12
inches in diameter, and two trees over 12 inches in diameter, the rating score is:
Shoreland Zoning Ordinance
Town of Warren
36
(4x1)+(2x2)+(3x4)+(2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees totaling 12 points (36-24 =
12) may be removed from the plot provided that no cleared openings are created.
The following shall govern in applying this point system:
i. The 25-foot by 50-foot rectangular plots must be established where the landowner or lessee
proposes clearing within the required buffer;
ii. Each successive plot must be adjacent to, but not overlap, a previous plot;
iii. Any plot not containing the required points must have no vegetation removed except as
otherwise allowed by this Ordinance;
iv. Any plot containing the required point may have vegetation removed down to the minimum
points required or as otherwise allowed by is Ordinance;
v. Where conditions permit, no more than 50% of the point on any 25-foot by 50-foot
rectangular area may consist of trees greater than twelve (12) inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining existing
vegetation under three (3) feet in heigh and other ground cover and retaining at least five (5)
saplings less than two (2) inches in diameter at four and one-half (4 ½) feet above ground level for
each 25-foot by 50-foot rectangle area. If five (5) saplings do not exist, no woody stems less than
two (2) inches in diameter can be removed until five (5) saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees four (4)
inches or more in diameter, measured at four and one-half (4 ½) feet above ground level may be
removed in any ten (10) year period.
c.
In order to protect water quality and wildlife habitat, existing vegetation under three (3) feet in
height and other ground cover, including leaf litter and the forest duff layer, shall not be cut,
covered or removed, except to provide for a footpath or other permitted uses as described in
Section 15(P) paragraphs (2) and (2)(a) above.
d. Pruning of tree branches, on the bottom third of the tree is allowed.
e. In order to maintain a buffer strip of vegetation, when the removal of storm-damaged, dead or
hazard trees results in the creation of cleared openings, these openings shall be replanted with
native tree species in accordance with Section Q, below, unless existing new tree growth is present.
f.
In order to maintain the vegetation in the shoreline buffer, clearing or removal of vegetation for
allowed activities, including associated construction and related equipment operation, within or
outside the shoreline buffer, must comply with the requirements of Section 15(P)(2).
Shoreland Zoning Ordinance
Town of Warren
37
3. At distances greater than one hundred (100) feet, horizontal distance, from a great pond classified GPA
or a river flowing to a great pond classified GPA, and seventy five (75) feet, horizontal distance, from
the normal high-water line of any other water body, tributary stream, or the upland edge of a wetland,
there shall be allowed on any lot, in any ten (10) year period, selective cutting of not more than forty
(40) percent of the volume of trees four (4) inches or more in diameter, measured four and one-half (4
½) feet above ground level. Tree removal in conjunction with the development of permitted uses shall
be included in the forty (40) percent calculation. For the purposes of these standards, volume may be
considered to be equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and accessory
structures, driveways, lawns and sewage disposal areas, exceed in the aggregate 25% of the lot area
within the shoreland zone or ten thousand (10,000) square feet, whichever is greater, including land
previously cleared. This provision applies to the portion of a lot within the shoreland zone, including
the buffer area, but shall not apply to the General development or Commercial Fisheries/Maritime
Activities Districts.
4. Legally existing nonconforming cleared openings may be maintained, but shall not be enlarged, except
as allowed by this Ordinance.
5. Fields and other cleared openings which have reverted to primarily shrubs, trees, or other woody
vegetation shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees
1. Hazard trees in the shoreland zone may be removed without a permit after consultation with the Code
Enforcement Officer if the following requirements are met:
a. Within the shoreline buffer, if the removal of a hard tree results in a cleared opening in the tree
canopy greater than two hundred and fifty (250) square feet, replacement with native tree species
is required, unless there is new tree growth already present. New tree growth must be as near as
practicable to where the hazard tree was removed and be at two (2) inches in diameter, measured
at four and one half (4.5) feet above the ground level. If new growth is not present, then
replacement trees shall consist of native species and be at least four (4) feet in height, and be no
less than two (2) inches in diameter, stumps may not be removed.
b. Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40) percent of
the volume of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet
above ground level in any ten (10) year period, and/or results in cleared openings exceeding
twenty-five (25) percent of the lot area within the shoreland zone, or ten thousand (10,000) square
feet, whichever is greater, replacement with native tree species is required, unless there is new
tree growth already present. New tree growth must be as near as practicable to where the hazard
tree was removed and be at least two (2) inches in diameter, measured at four and one half (4.5)
feet above ground level. If new growth is not present, then replacement trees shall consist of
native species and be at least two (2) inches in diameter, measured at four and one half (4.5) feet
above the ground level.
Shoreland Zoning Ordinance
Town of Warren
38
c.
The removal of standing dead trees, resulting from natural causes, is permissible without the need
for replanting or a permit, as long as the removal does not result in the creation of new lawn areas,
or other permanently cleared areas, and stumps are not removed. For the purposes of this
provision dead trees are those trees that contain no foliage during the growing season.
d. The Code Enforcement Officer may require the property owner to submit an evaluation from a
licensed forester or arborist before any hazard tree can be removed within the shoreland zone.
e. The Code Enforcement Officer may require more than a one-for-one replacement for hazard trees
removed that exceed eight (8) inches in diameter measured at four and one half (4.5) feet above
the ground level.
2. Storm damaged trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
a. Within the shoreline buffer, when the removal of storm-damaged trees results in a cleared opening
in the tree canopy greater than two hundred and fifty (250) square feet, replanting is not required,
but the area shall be required to naturally revegetate, and the following requirements must be
met:
i. The area from which a storm damaged tree is removed does not result in new lawn areas,
or other permanently cleared areas;
ii. Stumps from the storm damaged trees may not be removed;
iii. Limbs damaged from a storm event may be pruned even if they extend beyond the bottom
one-third (1/3) of the tree; and
iv. If after one growing season, no natural regeneration or regrowth is present, replanting of
native tree seedlings or saplings is required at a density of one seedling per every eighty
(80) square feet of lost canopy.
b. Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of the volume
of trees four (4) inches or more in diameter, measured at four and one half (4.5) feet above the
ground level in any ten (10) year period, or results, in the aggregate, in cleared openings exceeding
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet, whichever is
greater, and no natural regeneration occurs within one growing season, then native tree seedlings
or saplings shall be replanted on a one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in Section
15(P), provided that all other applicable requirements of this chapter are complied with, and the removal
of vegetation is limited to that which is necessary:
Shoreland Zoning Ordinance
Town of Warren
39
1. The removal of vegetation that occurs at least once every two (2) years for the maintenance of legally
existing areas that do not comply with the vegetation standards in this chapter, such as but not limited
to cleared openings in the canopy or fields. Such areas shall not be enlarged, except as allowed by this
section. If any of these areas, due to lack of removal of vegetation every two (2) years, reverts back to
primarily woody vegetation, the requirements of section 15(P) apply:
2. The removal of vegetation from the location of allowed structures or allowed uses, when the shoreline
setback requirements of Section 15(B) are not applicable.;
3. The removal of vegetation from the location of public swimming areas associated with an allowed
public recreational facility;
4. The removal of vegetation associated with allowed agricultural uses, provided best management
practices are utilized, and provided all requirements of section 15(N) are complied with;
5. The removal of vegetation associated with brownfields or voluntary response action program (VRAP)
projects provided that the removal of vegetation is necessary for remediation activities to clean up
contamination on a site in a general development district, commercial fisheries and maritime activities
district or other equivalent zoning district approved by the Commissioner that is part of a state or
federal brownfields program or a voluntary response action program pursuant to 38 MRSA, section
343-E, and that is located along;
a. A coastal wetland; or
b. A river that does not flow to a great pond classified as GPA pursuant to 38 MRSA section 465-A.
6. The removal of non-native invasive vegetation species, provided the following minimum requirements
are met:
a. If removal of vegetation occurs via wheeled or tracked motorized equipment, the wheeled or
tracked motorized equipment is operated and stored at least twenty-five (25) feet, horizontal
distance, from the shoreline, except that wheeled or tracked equipment may be operated or
stored on existing structural surfaces, such as pavement or gravel;
b. Removal of vegetation within twenty-five (25) feet, horizontal distance from the shoreline occurs
via hand tools; and
c.
If applicable clearing and vegetation removal standards are exceeded due to the removal of non-
native invasive species vegetation, the area shall be revegetated with native species to achieve
compliance.
NOTE: An updated list of non-native invasive vegetation is maintained by the Department of Agriculture,
Conservation
and
Forestry's
Natural
Areas
Program:
http://www.maine.gov/dacf/mnap/features/invasive_plants/invasives.htm
7. The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. environmental Protection Agency, the U.S. Coast Guard and their agents.
Shoreland Zoning Ordinance
Town of Warren
40
S. Revegetation Requirements
When revegetation is required in response to violations of the vegetation standards set forth in Section
15(P), to address the removal of non-native invasive species of vegetation, or as a mechanism to allow for
development that may otherwise not be permissible due to the vegetation standards, including removal of
vegetation in conjunction with a shoreline stabilization project, the revegetation must comply with the
following requirements.
1. The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include scaled site
plan, depicting where vegetation was, or is to be removed, where existing vegetation is to remain, and
where vegetation is to be planted, including a list of all vegetation to be planted.
2. Revegetation must occur along the same segment of shoreline and in the same are where vegetation
was removed and at a density comparable to the pre-existing vegetation, except where a shoreline
stabilization activity does not allow revegetation to occur in the same area and at a density comparable
to the pre=existing vegetation, in which case revegetation must occur along the same segment of
shoreline and as close as possible to the area where vegetation was removed;
3. If part of a permitted activity, revegetation shall occur before the expiration of the permit. If the
activity or revegetation is not completed before the expiration of the permit, a new revegetation plan
shall be submitted with any renewal or new permit application.
4. Revegetation activities must meet the following requirements for trees and saplings:
a. All trees and saplings removed must be replaced with native noninvasive species;
b. Replacement vegetation must at a minimum consist of saplings;
c.
If more than three (3) trees or saplings are planted, then at least three (3) different species shall
be used;
d. No one species shall make up 50% or more of the number of trees and saplings planted;
e. If revegetation is required for a shoreline stabilization project, and it is not possible to plant trees
and saplings in the same area where trees or saplings were removed, then trees or sapling must
be planted in a location that effectively reestablishes the screening between the shoreline and
structures; and
f.
A survival rate of at least eighty (80) percent of planted trees or saplings is required for a minimum
five (5) years period.
5. Revegetation activities must meet the following requirements for woody vegetation and other
vegetation under three (3) feet in height:
Shoreland Zoning Ordinance
Town of Warren
41
a. All woody vegetation and vegetation under three (3) feet in height must be replaced with native
noninvasive species of woody vegetation and vegetation under three (3) feet in height as
applicable;
b. Woody vegetation and vegetation under three (3) feet in height shall be planted in quantities and
variety sufficient to prevent erosion and provide for effective infiltration of stormwater;
c.
If more than three (3) woody vegetation plants are to be planted, then at least three (3) different
species shall be planted;
d. No one species shall make up 50% or more of the number of planted woody vegetation plants; and
e. Survival of planted woody vegetation and vegetation under three feet in height must be sufficient
to remain in compliance with the standards contained within this chapter for minimum of five (5)
years.
6. Revegetation activities must meet the following requirements for ground vegetation and ground cover:
a. All ground vegetation and ground cover removed must be replaced with native herbaceous
vegetation, in quantities and variety sufficient to prevent erosion and provide for effective
infiltration of stormwater;
b. Where necessary due to a lack of sufficient ground cover, an area must be supplemented with a
minimum of four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion and provide
for effective infiltration of stormwater; and
c.
Survival and functionality of ground vegetation and ground cover must be sufficient to remain in
compliance with the standards contained within this chapter for minimum of five (5) years.
T. Erosion and Sedimentation Control
1. All activities which involve filling, grading, excavation or other similar activities which result in
unstabilized soil conditions and which require a permit shall also require a written soil erosion and
sedimentation control plan. The plan shall be submitted to the permitting authority for approval and
shall include, where applicable, provisions for:
a. Mulching and revegetation of disturbed soil;
b. Temporary runoff control features, such as hay bales, silt fencing or diversion ditches; and
c.
Permanent stabilization structures such as retaining walls or rip-rap.
2. In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be required shall
be avoided wherever possible, and natural contours shall be followed as closely as possible.
3. Erosion and sedimentation control measures shall apply to all aspects of the proposed project involving
land disturbance and shall be in operation during all stages of the activity. The amount of exposed soil
at every phase of construction shall be minimized to reduce the potential for erosion.
Shoreland Zoning Ordinance
Town of Warren
42
4. Any exposed ground area shall be temporarily or permanently stabilized within one (1) week from the
time it was last actively worked, by use of riprap, sod, seed and mulch, or other effective measures. In
all cases, permanent stabilization shall occur within nine (9) months of the initial date of exposure. In
addition:
a. Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred (500)
square feet and shall be maintained until a catch of vegetation is established;
b. Anchoring the mulch with netting, peg and twine or other suitable method may be required
to maintain the mulch cover; and
c.
Additional measures shall be taken where necessary in order to avoid siltation into the water.
Such measures may include the use of staked hay bales or silt fences.
5. Natural and man-made drainage ways and drainage outlets shall be protected from erosion from water
flowing through them. Drainageways shall be designed and constructed in order to carry water from
a twenty-five (25) year storm or greater and shall be stabilized with vegetation or lined with riprap.
U. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can be
established or maintained without causing adverse environmental impacts, including severe erosion, mass
soil movement, improper drainage, and water pollution, whether during or after construction. Proposed
uses requiring subsurface waste disposal, and commercial or industrial development and other similar
intensive land uses, shall require a soils report based on an on-site investigation and be prepared by state-
certified professionals. Certified persons may include Maine Certified Soil Scientists, Maine Registered
Professional Engineers, Maine State Certified Geologists and other persons who have training and
experience in the recognition and evaluation of soil properties. The report shall be based upon the analysis
of the characteristics of the soil and surrounding land and water areas, maximum ground water elevation,
presence of ledge, drainage conditions and other pertinent data which the evaluator deems appropriate.
The soils report shall include recommendations for a proposed use to counteract soil limitations where they
exist.
V. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the State any
pollutant that, by itself or in combination with other activities or substances, will impair designated uses or
the water classification of the water body, tributary stream or wetland.
W. Archaeological Site. Any proposed land use activity involving structural development or soil disturbance
on or adjacent to sites listed on, or eligible to be listed on the National Register of Historic Places, as
determined by the permitting authority, shall be submitted by the applicant to the Maine Historic
Preservation Commission for review and comment, at least twenty (20) days prior to action being taken by
the permitting authority. The permitting authority shall consider comments received from the Commission
prior to rendering a decision on the application.
NOTE: Municipal officials should contact the Maine Historic Preservation Commission for the listing and
location of Historic Places in their community.
Shoreland Zoning Ordinance
Town of Warren
43
16. Administration
A. Administering Bodies and Agents
1. Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed annually by
July 1st.
2. Board of Appeals. A Board of Appeals for the Town of Warren has been created pursuant to the
provisions of 30-A MRSA Section 2691.
3. Planning Board. A Planning Board has been created pursuant to the provisions of State law.
B. Permits Required. After the effective date of this Ordinance, no person shall, without first obtaining a
permit, engage in any activity or use of land or structure requiring a permit in the district in which such
activity or use would occur or expand, change or replace an existing use or structure; or renew a
discontinued nonconforming use. A person who is issued a permit pursuant to this Ordinance shall have a
copy of the permit on site while the work authorized by the permit is performed.
1. A permit is not required for the replacement of an exiting road culvert as long as:
a. The replacement culvert is not more than 25% longer than the culvert being replaced;
b. The replacement culvert is no longer than seventy-five (75) feet; and
c.
Adequate erosion control measures are taken to prevent sedimentation of the water, and the
crossing does not block fish passage in the watercourse.
2. A permit is not required for an archaeological excavation as long as the excavation is conducted by an
archaeologist listed on the State Historic Preservation Officer's level 1 or level 2 approved list, and
unreasonable erosion and sedimentation is prevented by means of adequate and timely temporary
and permanent stabilization measures.
3. Any permit required by this Ordinance shall be in addition to any other permit required by other law
or ordinance.
C. Permit Application
1. Every applicant for a permit shall submit a written application along with proof of the proper fees paid,
including a scaled site plan, on a form provided by the Town, to the appropriate official as indicated in
Section 14.
2. All applicants shall be signed by an owner or individual who can show evidence of right, title or interest
in the property or by an agent, representative, tenant, or contractor of the owner with authorization
from the owner to apply for a permit hereunder, certifying that the information in the application is
complete and correct.
3. All applications shall be dated, and the Code Enforcement Officer or Planning Board, as appropriate,
shall note upon each application the date and time of its receipt.
Shoreland Zoning Ordinance
Town of Warren
44
4. If the property is not served by a public sewer, a valid plumbing permit or a completed application for
a plumbing permit, including the site evaluation approved by the Local Plumbing Inspector, shall be
submitted whenever the nature of the proposed structure would require the installation of a
subsurface sewage disposal system.
NOTE: If a municipality intends to take independent enforcement actions related to the contractor
certification requirements of 38 MRSA Section 439-B, they should insert the following into the application
requirements of their ordinance.
5. When an excavation contractor will perform an activity that requires or results in more than one (1)
cubic yard of soil disturbance, the person responsible for management of erosion and sedimentation
control practices at the site must be certified in erosion control practices by the Maine Department of
Environmental Protection. This person must present at the site each day earthmoving activity occurs
for a duration that is sufficient to ensure that proper sedimentation control measures have been
installed, which will either stay in place permanently or stay in place until the area is sufficiently
covered with vegetation necessary to prevent soil erosion. The name and certification number of the
person who will oversee the activity causing or resulting in soil disturbance shall be included on the
permit application. This requirement does not apply to a person or firm engaged in agriculture or
timber harvesting if best management practices for erosion and sedimentation control are used; and
municipal, state and federal employees engaged in projects associated with that employment.
D. Procedure for Administering Permits. Within thirty-five (35) days of the date of receiving a written
application, the Planning Board, Code Enforcement Officer, or Local Plumbing inspector, as indicated in
Section 14, shall notify the applicant in writing either that the application is a complete application, or, if
the application is incomplete, that specified addition material is needed to make the application complete.
The Planning Board or the Code Enforcement Officer, as appropriate, shall approve, approve with
conditions or deny all permit applications in writing within thirty-five (35) days of receiving a completed
application. However, if the Planning Board has a waiting list of applications, a decision on the application
shall occur within thirty-five (35) days after the first available date on the Planning Board's agenda following
receipt of the completed application or within thirty-five (35) days of the public hearing if one is held.
Permits shall be approved if the proposed use is found to be in conformance with the purposes and
provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in conformity with the
purposes and provisions of this Ordinance.
After submission of a complete application to the Code Enforcement officer or the Planning Board, as
appropriate, the Code Enforcement Officer or the Planning Board shall approve an application or approve
it with conditions if it makes a positive finding based on the information presented that the proposed use:
1. Will maintain safe and healthful conditions;
2. Will not result in water pollution, erosion, or sedimentation to surface waters;
3. Will adequately provide for the disposal of all wastewater;
Shoreland Zoning Ordinance
Town of Warren
45
4. Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other wildlife habitat;
5. Will conserve shore cover and visual, as well as actual, points of access to inland and coastal waters;
6. Will protect archaeological and historic resources as designated in the comprehensive plan;
7. Will not adversely affect existing commercial fishing or maritime activities in a Commercial
Fisheries/Maritime Activities district;
8. Will avoid problems associated with floodplain development and use; and
9. Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be stated in
writing. No approval shall be granted for an application involving a structure if the structure would be
located in an unapproved subdivision or would violate any other local ordinance, or regulation statute
administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting structure setback
requirements, the Planning Board may approve a permit for a single-family residential structure in a
Resource Protection District provided that the applicant demonstrates that all of the following conditions
are met:
1. There is no location on the property, other than a location within the Resource Protection District,
where the structure can be built.
2. The lot on which the structure is proposed is undeveloped and was established and recorded in the
registry of deeds of the county in which the lot is located before the adoption of the Resource
Protection District.
3. All proposed buildings, sewage disposal systems and other improvements are:
a. Located on natural ground slopes of less than 20%; and
b. Located outside the floodway of the 100-year flood-plain along rivers and artificially formed great
ponds along rivers and outside the velocity zone in areas subject to tides, based on detailed flood
insurance studies and as delineated on the Federal Emergency Management Agency's Flood
Boundary and Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements,
are elevated at least one foot above the 100-year flood-plain elevation; and the development is
otherwise in compliance with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is deemed to be
½ the width of the 100-year flood-plain.
Shoreland Zoning Ordinance
Town of Warren
46
4. The total footprint, including cantilevered or similar overhanging extensions, of all principal and
accessory structures is limited to a maximum of 1,500 square feet. This limitation shall not be altered
by variance.
5. All structures, except functionally water-dependent structures, are set back from the normal high-
water line of a water body, tributary stream or upland edge of a wetland to the greatest practical
extent, but not less than 75 feet, horizontal distance. In determining the greatest practical extent, the
Planning Board shall consider the depth of the lot, the slope of the land, the potential for soil erosion,
the type and amount of vegetation to be removed, the proposed building site's elevation in regard to
the flood-plain, and its proximity to moderate-value and high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial start is not
made in construction or in the use of the property during that period. If a substantial start is made within
one year of the issuance of the permit, the applicant shall have one additional year to complete the project,
at which time the permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any utility company
of any kind may not install services to any new structure located in the shoreland zone unless written
authorization attesting to the validity and currency of all local permits required under this or any previous
Ordinance has been issued by the appropriate municipal officials or other written arrangements have been
made between the municipal officials and the utility.
H. Appeals
1. Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following powers:
a. Administrative Appeals: To hear and decide administrative appeals, on an appellate basis, where
it is alleged by an aggrieved party that there is an error in any order, requirement, decision, or
determination made by, or failure to act by, the Planning Board in the administration of this
Ordinance; and to hear and decide administrative appeals on a de novo basis where it is alleged
by an aggrieved party that there is an error in any order, requirement, decision or determination
made by, or failure to act by, the Code Enforcement Officer in his or her review of and action on a
permit application under this Ordinance. Any order, requirement, decision or determination
made, or failure to act, in the enforcement of this ordinance is not appealable to the Board of
Appeals.
b. Variance Appeals: To authorize variances upon appeal, within the limitations set forth in this
Ordinance.
2. Variance Appeals. Variances may be granted only under the following conditions:
a. Variances may be granted only from dimensional requirements including, but not limited to, lot
width, structure height, percent of lot coverage, and setback requirements.
b. Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
c.
The Board shall not grant a variance unless it finds that:
Shoreland Zoning Ordinance
Town of Warren
47
i.
The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is sought;
and
ii.
The strict application of the terms of this Ordinance would result in undue hardship. The
term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted.
b. That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
c.
That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or prior owner.
d. Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals, or the code enforcement
officer if authorized in accordance with 30-A MRSA §4353-A, may grant a variance to an owner of
a residential dwelling for the purpose of making that dwelling accessible to a person with a
disability who resides in or regularly uses the dwelling. The board shall restrict any variance
granted under this subsection solely to the installation of equipment or the construction of
structures necessary for access to or egress from the dwelling by the person with the disability.
The board may impose conditions on the variance, including limiting the variance to the duration
of the disability or to the time that the person with the disability lives in the dwelling. The term
"structures necessary for access to or egress from the dwelling" shall include railing, wall or roof
systems necessary for the safety or effectiveness of the structure. Any permit issued pursuant to
this subsection is subject to Sections 16(H)(2)(f) and 16(H)(4)(b)(iv) below.
e. The Board of Appeals shall limit any variances granted as strictly as possible in order to ensure
conformance with the purposes and provisions of this Ordinance to the greatest extent possible,
and in doing so may impose such conditions to a variance as it deems necessary. The party
receiving the variance shall comply with any conditions imposed.
f.
A copy of each variance request, including the application and all supporting information supplied
by the applicant shall be forwarded by the municipal officials to the Commissioner of the
Department of Environmental protection at least twenty (20) days prior to action by the Board of
Appeals. Any comments received from the Commissioner prior to the action by the Board of
Appeals shall be made part of the record and shall be taken into consideration by the Board of
Appeals.
3. Administrative Appeals
Shoreland Zoning Ordinance
Town of Warren
48
When the Board of Appeals reviews a decision of the Code Enforcement Officer, the Board of Appeals
shall hold a "de novo" hearing. At this time, the Board may receive and consider new evidence and
testimony, be it oral or written. When acting in a "de novo" capacity, the Board of Appeals shall hear
and decide the matter afresh, undertaking its own independent analysis of evidence and the law and
reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate hearing
and may reverse the decision of the Planning Board only upon finding that the decision was contrary
to specific provisions of the Ordinance or contrary to the facts presented to the Planning Board. The
Board of Appeals may only review the record of the proceedings before the Planning Board. The Board
of Appeals shall not receive or consider any evidence which was not presented to the Planning Board,
but the Board of Appeals may receive and consider written or oral arguments. If the Board of Appeals
determines that the record of the Planning Board proceedings are inadequate, the Board of Appeals
may remand the matter to the Planning Board for additional fact finding.
4. Appeal Procedure
a. Making an Appeal
i. An administrative or variance appeal may be taken to the Board of Appeals by an aggrieved
party from any decision of the Code Enforcement Officer or the Planning Board, except for
enforcement-related matters as described in Section 16(H)(1)(a) above. Such an appeal
shall be taken within thirty (30) days of the date of the official, written decision appealed
from, and not otherwise, except that the Board, upon a showing of good cause, may waive
the thirty (30) day requirement.
ii. Applications for appeals shall be made by filing with the Board of Appeals a written notice
of appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures, and other physical features of the lot pertinent to the relief sought.
iii. Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
iv. The Board of Appeals shall hold a public hearing on an administrative appeal or a request
for a variance within thirty-five (35) days of its receipt of a complete written application,
unless this time period is extended by the parties.
b. Decision by Board of Appeals
Shoreland Zoning Ordinance
Town of Warren
49
i. A majority of the full voting membership of the Board shall constitute a quorum for the
purpose of deciding an appeal.
ii. The person filing the appeal shall have the burden of proof.
iii. The Board shall decide all administrative appeals and variance appeals within thirty-five (35)
days after the close of the hearing and shall issue a written decision on all appeals.
iv. The Board of Appeals shall state the reasons and basis for its decision, including a statement
of the facts found and conclusions reached by the Board. The Board shall cause written
notice of its decision to be mailed or hand delivered to the applicant and to the Department
of Environmental Protection within seven (7) days of the Board's decision. Copies of written
decisions of the Board of Appeals shall be given to the Planning Board, Code Enforcement
Officer, and the municipal officers.
5. Appeal to Superior Court. Except as provided by 30-A MRSA Section 2691(3)(F), any aggrieved party
who participated as a party during the proceedings before the Board of Appeals may take an appeal to
Superior Court in accordance with State laws within forty-five (45) days from the date of any decision
of the Board of Appeals.
6. Reconsiderations. In accordance with 30-A MRSA Section 2691(3)(F), the Board of Appeals may
reconsider any decision within forty-five (45) days of its prior decision. A request to the Board to
reconsider a decision must be filed within ten (10) days of the decision that is being reconsidered. A
vote to reconsider and the action taken on that reconsideration must occur and be completed within
forty-five (45) days of the date of the vote on the original decision. Reconsideration of a decision shall
require a positive vote of the majority of the Board members originally voting on the decision, and
proper notification to the landowner, petitioner, Planning Board, Code Enforcement Officer, and other
parties of interest, including abutters and those who testified at the original hearing(s). The Board may
conduct additional hearings and receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days after the
decision on reconsideration.
I.
Enforcement
1. Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
2. Code Enforcement Officer
a. It shall be the duty of the Code Enforcement Officer to enforce the provisions of this Ordinance. If
the Code Enforcement Officer shall find that any provision of this Ordinance is being violated, he
or she shall notify in writing the person responsible for such violation, indicating the nature of the
violation and ordering the action necessary to correct it, including discontinuance of illegal use of
land, buildings or structures, or work being done, removal of illegal buildings or structures, and
abatement of nuisance conditions. A copy of such notices shall be submitted to the municipal
officers and be maintained as a permanent record.
Shoreland Zoning Ordinance
Town of Warren
50
b. The Code Enforcement Officer shall conduct on-site inspections to ensure compliance with all
applicable laws and conditions attached to permit approvals. The Code Enforcement Officer shall
also investigate all complaints of alleged violations of this Ordinance.
c.
The Code Enforcement Officer shall keep a complete record of all essential transactions of the
office, including applications submitted, permits granted or denied, variances granted or denied,
revocation actions, revocation of permits, appeals, court actions, violations investigated, violations
found, and fees collected.
3. Legal Actions. When the above action does not result in the correction or abatement of the violation
or nuisance condition, the Municipal Officers, upon notice from the Code Enforcement Officer, are
hereby directed to institute any and all actions and proceedings, either legal or equitable, including
seeking injunctions of violations and the imposition of fines that may be appropriate or necessary to
enforce the provisions of this Ordinance in the name of the municipality. The municipal officers, or
their authorized agent, are hereby authorized to enter into administrative consent agreements for the
purpose of eliminating violations of this Ordinance and recovering fines without Court action. Such
agreements shall not allow an illegal structure or use to continue unless there is clear and convincing
evidence that the illegal structure or use was constructed or conducted as a direct result of erroneous
advice given by an authorized municipal official and there is no evidence that the owner acted in bad
faith, or unless the removal of the structure or use will result in a threat or hazard to public health and
safety or will result in substantial environmental damage.
4. Fines. Any person, including but not limited to a landowner, a landowner's agent or a contractor, who
violates any provision or requirement of this Ordinance shall be penalized in accordance with 30-A
MRSA Section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2,500 per violation for each
day that the violation continues. However, in a resource protection district the maximum penalty is
increased to $5,000 (38 MRSA Section 4452).
17. Definitions
Accessory Structure or Use - A use or structure which is incidental and subordinate to the principal use or
structure. Accessory uses, when aggregated, shall not subordinate the principal use or structure. Accessory
uses, when aggregated, shall not subordinate the principal use of the lot. A deck or similar extension of the
principal structure or a garage attached to the principal structure by a roof or a common wall is considered part
of the principal structure.
Aggrieved Party - An owner of land whose property is directly or indirectly affected by the granting or denial of
a permit or variance under this Ordinance; a person whose land abuts land for which a permit or variance has
been granted; or any other person or group of persons who have suffered particularized injury as a result of the
granting or denial of such permit or variance.
Agriculture - The production, keeping or maintenance for sale or lease of plants or animals, including, but not
limited to: forages and sod crops, grains and seed crops, dairy animals and dairy products, poultry and poultry
Shoreland Zoning Ordinance
Town of Warren
51
products, livestock, fruits and vegetables, and ornamental green-house products. Agriculture does not include
forest management and timber harvesting activities.
Aquaculture - The growing or propagation of harvestable freshwater, estuarine, or marine plant or animal
species.
Basal Area - The area of cross-section of a tree stem at four and one half (4 ½) feet above ground level and
inclusive of bark.
Basement - Any portion of a structure with a floor-to-ceiling height of six (6) feet or more and having more than
50% of its volume below the existing ground level.
Bed & Breakfast - A single family, owner occupied dwelling in which lodging or lodging and meals are provided
to overnight guests for a fee, and which consists of no more than six (6) bedrooms for lodging purposes.
Boat Launching Facility - A facility designed primarily for the launching and landing of watercraft, and which
may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation and Forestry, Bureau of Forestry.
Campground - Any area or tract of land to accommodate two (2) or more parties in temporary living quarters,
including but not limited to tents, recreational vehicles or other shelters.
Canopy - The more or less continuous cover formed by tree crowns in a wooded area.
Coastal Wetland - All tidal and subtidal lands; all lands with vegetation present that is tolerant of salt water and
occurs primarily in a salt water or estuarine habitat; and any swamp, marsh, bog, beach, flat or other contiguous
low land that is subject to tidal action during the highest tide level for the year in which an activity is proposed
as identified in tide tables published by the National Ocean Service. Coastal wetlands may include portions of
coastal sand dunes.
NOTE: All areas below the highest annual tide level are coastal wetlands. These areas may consist of rocky
ledges, sand and cobble beaches, mud flats, etc. in addition to salt marshes and salt meadows.
Commercial Fishing Activities - Activities directly related to commercial fishing and those commercial fishing
activities commonly associated with or supportive of commercial fishing, such as the manufacture or sale of ice,
bait and nets, and the sale, manufacture, installation or repair of boats, engines and other equipment commonly
used on boats.
Commercial Use - The use of lands, buildings or structures, other than a "home occupation," defined below,
the intent and result of which activity is the production of income from the buying and selling of good and/or
services, exclusive of rental of residential buildings and/or dwelling units.
DBH - the diameter of a standing tree measured four and one half (4 ½) feet from ground level.
Densely Developed - Any commercial, industrial or compact residential area of ten (10) or more acres with a
density of at least one principal structure per two (2) acres.
Shoreland Zoning Ordinance
Town of Warren
52
Development - A change in land use involving alteration of the land, water or vegetation, or the addition or
alteration of structures or other construction not naturally occurring.
Dimensional Requirements - Numerical standards, relating to spatial relationships including but not limited to
setback, lot area, shore frontage and height.
Disability - Any disability, infirmity, malformation, disfigurement, congenital defect or mental condition caused
by bodily injury, accident, disease, birth defect, environmental conditions or illness and also includes the
physical or mental condition of a person which constitutes a substantial handicap as determined by a physician
or in the case of mental handicap, by a psychiatrist or psychologist, as well as any other health or sensory
impairment which requires special education, vocational rehabilitation or related services.
Driveway - A vehicular access-way less than five hundred (500) feet in length serving two single family dwellings
or one two family dwelling, or less.
Emergency Operations - Operations conducted for the public health, safety or general welfare, such as
protection of resources from immediate destruction or loss, law enforcement and operations to rescue human
beings, property and livestock from the threat of destruction or injury.
Essential Services - Gas, electrical or communication facilities; steam, fuel, electric power or water transmission
or distribution lines, tower sand related equipment; telephone cables or lines, poles and related equipment;
gas, oil, water, slurry or other similar pipelines; municipal sewage lines, collection or supply systems and
associated storage tanks. Such systems may include towers, poles, wires, mains, drains, pipes, conduits, cables,
fire alarms and police call boxes, traffic signals, hydrants and similar accessories, but shall not include service
drops or buildings which are necessary for the furnishing of such services.
Expansion of a Structure - An increase in the footprint of a structure, including all extensions such as, but not
limited to: attached decks, garages, porches and greenhouses.
Expansion of Use - The addition of one or more months to a use's operating season; or the use of more footprint
of a structure or ground area devoted to a particular use.
Family - One or more persons occupying a premises and living as a single housekeeping unit.
Floodway - The channel of a river or other water course and adjacent land areas that must be reserved in order
to discharge the 100-year flood without cumulatively increasing the water surface elevation by more than one
foot in height.
Floor Area - The sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint - The entire area of ground covered by the structure(s) on a lot, including but not limited to
cantilevered or similar overhanging extensions as well as unenclosed structures, such as patios and decks.
Shoreland Zoning Ordinance
Town of Warren
53
Forest Management Activities - Timber cruising and other forest resource evaluation activities, pesticide or
fertilizer application, management planning activities, timber stand improvement, pruning, regeneration of
forest stands, and other similar or associated activities, exclusive of timber harvesting and the construction,
creation or maintenance of roads.
Forest Stand - A contiguous group of trees sufficiently uniform in age class distribution, composition and
structure, and growing on a site of sufficiently uniform quality, to be a distinguishable unit.
Forested Wetland - A freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Foundation - The supporting substructure of a building or other structure, excluding wooden sills and post
supports, but including basements, slabs, frostwalls, or other base consisting of concrete, block, brick or similar
material.
Freshwater Wetland - Freshwater swamps, marshes, bogs and similar areas, other than forested wetlands,
which are:
1. Of ten (10) or more contiguous acres; or of less than ten (10) contiguous acres and adjacent to a surface
water body, excluding any river, stream or brook, such that in a natural state, the combined surface
area is in excess of ten (10) acres; and
2. Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to
support, and which under normal circumstances do support, a prevalence of wetland vegetation
typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the
criteria of this definition.
Functionally Water-Dependent Uses - Those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that can not be
located away from these waters. The uses include, but are not limited to, commercial and recreational fishing
and boating facilities, finfish and shellfish processing, fish related storage and retail and wholesale fish marketing
facilities, waterfront dock and port facilities, shipyards and boat building facilities, marinas, navigation aids,
basins and channels, shoreline structures necessary for erosion control purposes, industrial uses dependent
upon water borne transportation or requiring large volumes of cooling or processing water that cannot
reasonably be located or operated at an inland site, and uses that primarily provide general public access to
coastal or inland waters. Recreational boat storage buildings are not considered to be a functionally water-
dependent use.
Great Pond - Any inland body of water which in a natural state has a surface area in excess of ten acres, and
any inland body of water artificially formed or increased which has a surface area in excess of thirty (30) acres
except for the purposes of this Ordinance, where the artificially formed or increased inland body of water is
completely surrounded by land held by a single owner.
Shoreland Zoning Ordinance
Town of Warren
54
Great Pond Classified GPA - Any great pond classified GPA, pursuant to 38 MRSA Article 4-A Section 465-A. This
classification includes some, but not all impoundments of rivers that are defined as great ponds.
Ground Cover - Small plants, fallen leaves, needles and twigs, and the partially decayed organic matter of the
forest floor.
Harvest Area - The area where timber harvesting and related activities, including the cutting of trees, skidding,
yarding and associated road construction take place. The area affected by a harvest encompasses the area
within the outer boundaries of these activities, excepting unharvested areas greater than 10 acres within the
area affected by a harvest.
Hazard Tree - A tree with a structural defect, combination of defects or disease resulting in a structural defect
that under the normal range of environmental conditions at the site exhibits a high probability of failure and
loss of a major structural component of the tree in a manner that will strike a target. A normal range of
environmental conditions does not include meteorological anomalies, such as, but not limited to: hurricanes;
hurricane force winds; tornadoes; microbursts or significant ice storm events. Hazard trees also include those
trees that pose a serious and imminent risk to bank stability. A target is the area where personal injury or
property damage could occur if a tree or portion of the tree fails. Targets include roads, driveways, park areas,
structures, campsites, and any other developed area where people frequently gather and linger.
Height of a Structure - The vertical distance between the mean original (prior to construction) grade at the
downhill side of the structure and highest point of the structure, excluding chimneys, steeples, antennas, and
similar appurtenances that have no floor area.
Home Occupation - An occupation or profession which is customarily conducted on or in a residential structure
or property and which is:
1. Clearly incidental to and compatible with the residential use of the property and surrounding
residential uses; and
2. Which employs no more than two (2) persons other than family members residing in the home.
Increase in Nonconformity of a Structure - Any change in a structure or property which causes further deviation
from the dimensional standard(s) creating the nonconformity such as, but not limited to, reduction in water
body, tributary stream or wetland setback distance, increase in lot coverage or increase in height of a structure.
Property changes or structure expansions which either meet the dimensional standard or which cause no further
increase in the linear extent of nonconformance of the existing structure shall not be considered to increase
nonconformity. For example, there is no increase in nonconformity with the setback requirement for water
bodies, wetlands or tributary streams if the expansion extends no further into the required setback area than
docs any portion of the existing nonconforming structure. Hence, a structure may be expanded laterally
provided that the expansion extends no closer to the water body, tributary stream, or wetland than the closes
portion of the existing structure from that water body, tributary stream or wetland. Included in this allowance
are expansions which in fill irregularly shaped structures.
Shoreland Zoning Ordinance
Town of Warren
55
Individual Private Campsite - An area of land which is not associated with a campground, but which is
developed for repeated camping by only one group not to exceed ten (10) individuals and which involves site
improvements which may include but not be limited to a gravel pad, parking area, fire place or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of goods, or the
extraction of minerals.
Industrial Metallic Mineral Mining: the exploration for or extraction of metallic minerals, by a person or
persons acting in concert which occupies or disturbs an aggregate land area of 1 acre or more, regardless of
the number of exploration or extraction sources or sites used. Industrial metallic mineral mining includes any
structures, facilities, or processes associated with the exploration for or extraction of metallic minerals,
including but not limited to: bulk sampling, preparation, washing, cleaning, processing, beneficiation, or other
treatment of metallic minerals; the storage or stockpiling of bulk sampling materials or main waste, whether
or not the exploration or extraction occurs within the geographic boundaries of the town; and reclamation
activities. Industrial metallic mineral mining does not include (i) non-commercial mineral exploration by means
of test boring, test drilling, hand sampling or digging of test pits which disturbs the land area of less than 1
acre or (ii) the excavation, processing, or quarrying of sand, fill, gravel, clay, topsoil, peat, silt, or rock not
associated with metallic mineral mining. For purposes of this definition, "bulk sampling" means the removal of
samples of earth materials to test the feasibility, method, or manner of extraction or processing of metallic
minerals by drilling and boring, digging of shafts and tunnels, or digging of pits and trenches, and "minor
waste" means all overburden, rock, ore, tailings and other mining related materials that are exposed or
removed from the Earth as part of any metallic mineral mining exploration or extraction operation.
Institutional - A non-profit or quasi-public use, or institution such as a church, library, public or private school,
hospital or municipally owned or operated building, structure or land used for public purposes.
Land Management Road - A route or track consisting of a bed of exposed mineral soil, gravel or other surfacing
materials constructed for, or created by, the passage of motorized vehicles and used primarily for timber
harvesting and related activities, including associated log yards, but not including skid trails or skid roads.
Licensed Forester - A forester licensed under 32 MRSA Chapter 76.
Lot Area - The area of land enclosed within the boundary lines of a lot, minus land below the normal high-water
line of a water body or upland edge of a wetland and areas beneath roads serving more than two lots.
Marina - A business establishment having frontage on navigable water and, as its principal use, providing for
hire offshore moorings or docking facilities for boats, and which may also provide accessory services such as
boat and related sales, boat repair and construction, indoor and outdoor storage of boats and marine
equipment, bait and tackle shops and marine fuel service facilities.
Maritime Activities - The construction, repair, storage, loading and unloading of boats, chandlery and other
commercial activities designed and intended to facilitate maritime trade.
Market Value - The estimated price a property will bring in the open market and under prevailing market
conditions in a sale between a willing seller and a willing buyer, both conversant with the property and with
prevailing general price levels.
Shoreland Zoning Ordinance
Town of Warren
56
Mineral Exploration - Hand sampling, test boring, or other methods of determining the nature or extent of
mineral resources, other than methods associated with industrial metallic mineral mining, which create minimal
disturbance to the land and which include reasonable measures to restore the land to its original condition.
Mineral Extraction - Any operation, other than industrial metallic mineral mining, within any twelve (12) month
period which removes more than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock,
peat, or other like material from its natural location and to transport the product removed away from the
extraction site.
Minimum Lot Width - The closest distance between the side lot lines of a lot. When only two lot lines extend
into the shoreland zone, both lot lines shall be considered to be side lot lines.
Mulit-Unit Residential - A residential structure containing three (3) or more residential dwelling units.
Native - Indigenous to the local forests.
Non-Conforming Condition - Non-conforming lot, structure or use which is allowed solely because it was in
lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-Conforming Lot - A single lot of record which, at the effective date of adoption or amendment of this
Ordinance, does not meet the area, frontage, or width requirements of the district in which it is located.
Non-Conforming Structure - A structure which does not meet any one or more of the following dimensional
requirements: setback, height, lot coverage or footprint, but which is allowed solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
Non-Conforming Use - Use of buildings, structures, premises, land or parts thereof which is not allowed in the
district in which it is situated, but which is allowed to remain solely because it was in lawful existence at the
time this Ordinance or subsequent amendments took effect.
Non-Native Invasive Species of Vegetation - Species of vegetation listed by the Maine Department of
Agriculture, Conservation and Forestry as being invasive in Maine ecosystems and not native to Maine
ecosystems.
Normal High-Water Line (Non-Tidal Waters) - That line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water or changes in vegetation, and which distinguishes
between predominantly aquatic and predominantly terrestrial land. Areas contiguous with rivers and great
ponds that support non-forested wetland vegetation and hydric soils and that are at the same or lower elevation
as the water level of the river or great pond during the period of normal high-water are considered part of the
river or great pond.
NOTE: Adjacent to tidal waters, setbacks are measured from the upland edge of the "coastal wetland."
Outlet Stream - Any perennial or intermittent stream, as shown on the most recent highest resolution version
of the national hydrography dataset available from the United States Geological Survey on the website of the
United States Geological Survey or the national map that flows from a freshwater wetland.
Outstanding River Segments - (Land Use Book §480-P) In accordance with Title 12, Section 402, outstanding
river segment in Warren is the St. George River from the Route 90 bridge in Warren to the outlet of Lake St.
Shoreland Zoning Ordinance
Town of Warren
57
George in Liberty, excluding White Oak pond, Seven Tree Pond, Round Pond, Sennebec Pond, Trees Pond,
Stevens Pond and Little Pond.
Person - An individual, corporation, governmental agency, municipality, trust, estate, partnership, association,
two or more individuals having a joint or common interest, or other legal entity.
Piers, Docks, Wharves, Bridges and Other Structures and Uses extending over or beyond the normal high-water
line or within a wetland:
Temporary:
Structures which remain in or over the water for less than seven (7) months in any
period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or more in any period
of twelve (12) consecutive months.
Principal Structure - A structure other than one which is used for purposes wholly incidental or accessory to
the use of another structure or use on the same lot.
Principal Use - A use other than one which is wholly incidental or accessory to another use on the same lot.
Privy - A pit in the ground into which human excrement is placed.
Public Facility - Any facility, including but not limited to, buildings, property, recreation areas, and roads, which
are owned, leased or otherwise operated, or funded by a governmental body or public entity.
Recent Floodplain Soils - The following soil series as described and identified by the National Cooperative Soil
Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational Facility - A place designed and equipped for the conduct of sports, leisure time activities and other
customary and usual recreational activities, excluding boat launching facilities.
Recreational Vehicle - A vehicle or attachment to a vehicle designed to be towed, and designed for temporary
sleeping or living quarters for one or more persons, and which may include a pick-up camper, travel trailer, tent
trailer, camp trailer, and motor home. In order to be considered as a vehicle and not as a structure, the unit
must remain with its tires on the ground and must be registered with the State Division of Motor Vehicles.
Replacement System - A system intended to replace:
1. An existing system which is either malfunctioning or being upgraded with no significant change of
design flow or use of the structure; or
2. Any existing overboard wastewater discharge.
Shoreland Zoning Ordinance
Town of Warren
58
Residential Dwelling Unit - A room or group of rooms designed and equipped exclusively for use as permanent,
seasonal, or temporary living quarters for only one family at a time, and containing cooking, sleeping and toilet
facilities. The term shall include mobile homes and rental units that contain cooking, sleeping and toilet facilities
regardless of the time-period rented. Recreational vehicles are not residential dwelling units.
Residual Basal Area - The average of the basal area of trees remaining on a harvested site.
Residual Stand - A stand of trees remaining in the forest following timber harvesting and related activities.
Riprap - Rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control and soil
stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit vertical or less.
River - A free-flowing body of water including its associated floodplain wetlands from that point at which it
provides drainage for a watershed of twenty five (25) square miles to its mouth.
NOTE: the portion of a river that is subject to tidal action is a coastal wetland.
Road: A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing material
constructed for or created by the repeated passage of motorized vehicles, excluding a driveway as defined.
Salt Marsh - Areas of coastal wetland (most often along coastal bays) that support salt tolerant species, and
where at average high tide during the growing season, the soil is irregularly inundated by tidal waters. The
predominant species is saltmarsh cordgrass (Spartina alterniflora). More open areas often support widgeon
grass, eelgrass and Sago pondweed.
Salt Meadow - Areas of a coastal wetland that support salt tolerant plant species bordering the landward side
of salt marshes or open coastal water, where the soil is saturated during the growing season but which is rarely
inundated by tidal water. Indigenous plant species include salt meadow cordgrass (Spartina patens) and black
rush; common threesquare occurs in fresher areas.
Sapling - A tree species that is less than two (2) inches in diameter at four and one half (4 ½) feet above ground
level.
Seedling - A young tree species that is less than found and one half (4.5) feet in height above ground level.
Service Drop - Any utility line extension which does not cross or run beneath any portion of a water body
provided that:
1. In the case of electric service:
a. The placement of wires and/or the installation of utility poles is located entirely upon the premises
of the customer requesting service or upon a roadway right-of-way; and
b. The total length of the extension is less than one thousand (1,000) feet.
2. In the case of telephone service:
a. The extension, regardless of length, will be made by the installation of telephone wires to existing
utility poles; or
Shoreland Zoning Ordinance
Town of Warren
59
b. The extension requiring the installation of new utility poles or placement underground is less than
one thousand (1,000) feet in length.
Setback - The nearest horizontal distance from the normal high-water line of a water body or tributary stream,
or upland edge of a wetland, to the nearest part of a structure, road, parking space or other regulated object or
area.
Shore Frontage - The length of a lot bordering on a water body or wetland measured in a straight line between
the intersections of the lot lines with the shoreline.
Shoreland Zone - The land area located within two hundred fifty (250) feet, horizontal distance, of the normal
high-water line of any great pond or river, within two hundred fifty (250) feet, horizontal distance, of the upland
edge of a coastal wetland, including all areas affected by tidal action; within two hundred fifty (250) feet of the
upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the normal high-
water line of a stream.
Shoreline - The normal high-water line, or upland edge of a freshwater or coastal wetland.
Significant River Segments - See Appendix A or 38 MRSA Section 437.
Significant Wildlife Habitat - Habitat for species appearing on the official state or federal lists of endangered or
threatened species; high and moderate value deer wintering areas and travel corridors as defined by the
Department of Inland Fisheries and Wildlife; high and moderate value waterfowl and wading bird habitats,
including nesting and feeding areas as defined by the Department of Inland Fisheries and Wildlife; and shorebird
nesting, feeding and staging areas and seabird nesting islands as defined by the Department of Inland Fisheries
and Wildlife.
Skid Trail - A route repeatedly used by forwarding machinery or animal to haul or drag forest products from the
stump to the yard or landing, the construction of which requires minimal excavation.
Slash - The residue, e.g., treetops and branches, left on the ground after a timber harvest.
Storm Damaged Tree - A tree that has been uprooted, blown down, is lying on the ground, or that remains
standing and is damaged beyond the point of recovery as the result of a storm event.
Stream - A free flowing body of water from the outlet of a great pond or the confluence of two (2) perennial
streams as depicted on the most recent, highest resolution version of the national hydrography dataset available
from the United States Geological Survey on the website of the United States Geological Survey or the national
map, to the point where the stream becomes a river or where the stream meets the shoreland zone of another
water body or wetland. When a stream meets the shoreland zone of a water body or wetland and a channel
forms downstream of the water body or wetland as an outlet, that channel is also a stream.
Structure - Anything temporarily or permanently located, built, constructed or erected for the support, shelter
or enclosure of persons, animals, goods or property of any kind, or anything constructed or erected on or in the
ground. The term includes structures temporarily or permanently located, such as decks, patios, and satellite
dishes. Structures does not include fences; poles and wiring and other aerial equipment normally associated
with service drops, including guy wires and guy anchors; subsurface waste water disposal systems as defined in
Shoreland Zoning Ordinance
Town of Warren
60
Title 30-A, section 4201 subsection 5; geothermal heat exchange wells as defined in Title 32, section 4700-E,
subsection 3-C; or wells or water wells as defined in Title 32, section 4700-E, subsection 8.
Substantial Start - Completion of thirty (30) percent of a permitted structure or use measured as a percentage
of estimated total cost.
Subsurface Sewage Disposal System - Any system designed to dispose of waste or waste water on or beneath
the surface of the earth; includes, but is not limited to: septic tanks; disposal fields; grandfathered cesspools;
holding tanks; pretreatment filter, piping or any other fixture, mechanism or apparatus used for those purposes;
does not include any discharge system licensed under 38 MRSA Section 414, any surface waste water disposal
system, or any municipal or quasi-municipal sewer or waste water treatment system.
Sustained Slope - A change n elevation where the referenced percent grade is substantially maintained or
exceeded throughout the measured area.
Tidal Waters - All waters affected by tidal action during the highest annual tide.
Timber Harvesting - The cutting and removal of timber for the primary purpose of selling or processing forest
products. "Timber harvesting" does not include the cutting or removal of vegetation within the shoreland zone
when associated with any other land use activities. The cutting or removal of trees in the shoreland zone on a
lot that has less than two (2) acres within the shoreland zone shall not be considered timber harvesting. Such
cutting or removal of trees shall be regulated pursuant to section 15(P), Clearing or Removal of Vegetation for
Activities Other Than Timber Harvesting.
Tourist Home - An establishment in a private dwelling that provides temporary accommodation to overnight
guests for a fee.
Tree - A woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four and one
half (4.5) feet above the ground with a more or less definite crown and reaching a height of at lest ten (10) feet
at maturity.
Tributary Stream - Means a channel between defined banks created by the action of surface water, which is
characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of topsoil, containing
waterborne deposits or exposed soil, parent material or bedrock; and which is connected hydrologically with
other water bodies. "Tributary stream" does not include rills or gullies forming because of accelerated erosion
in disturbed soils where the natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only applies to
that portion of the tributary stream located within the shoreland zone of the receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland Edge of a Wetland - The boundary between upland and wetland. For purposes of a coastal wetland,
this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or the highest annual
tide level, including all areas affected by tidal action. For purposes of a freshwater wetland, the upland edge is
formed where the soils are not saturated for a duration sufficient to support wetland vegetation; or where the
soils support the growth of wetland vegetation, but such vegetation is dominated by woody stems that are six
(6) meters (approximately twenty (20) feet) tall or taller.
Shoreland Zoning Ordinance
Town of Warren
61
Vegetation - All live trees, shrubs, and other plants, including without limitation, trees both over and under four
(4) inches in diameter, measured at four and one half (4 ½) feet above ground level.
Velocity Zone - An area of special flood hazard extending from offshore to the inland limit of the primary fontal
dune along an open coast and any other area subject to high velocity wave action from storms or seismic
sources.
Volume of a Structure - The volume of all portions of a structure enclosed by roof and fixed exterior walls as
measured from the exterior faces of these walls and roof.
Water Body - Any great pond, river or stream.
Water Crossing - Any project extending from one bank to the opposite bank of a river, stream, tributary stream,
or wetland whether under, through, or over the water or wetland. Such projects include but may not be limited
to roads, fords, bridges, culverts, water lines, sewer lines, and cables as well as maintenance work on these
crossings. This definition includes crossings for timber harvesting equipment and related activities.
Wetland - A freshwater or coastal wetland.
Windfirm - The ability of a forest stand to withstand strong winds and resist windthrow, wind rocking and major
breakage.
Woody Vegetation - Live trees or woody, non-herbaceous shrubs.
Shoreland Zoning Ordinance
Town of Warren
62
APPENDIX A
38 §437 Significant river segments identified
For purposes of this chapter, significant river segments include the following:
1. Aroostook River. The Aroostook River from St. Croix Stream in Masardis to the Masardis and T.10, R.6,
W.E.L.S. town line, excluding segments in T.9, R.5, W.E.L.S.; including its tributary the Big Machias River from
the Aroostook River in Ashland to the Ashland and Garfield Plantation town lines;
2. Dennys River. The Dennys River from the railroad bridge in Dennysville Station to the dam at Meddybemps
Lake, excluding the western shore in Edmunds Township and No. 14 Plantation;
3. East Machias River. The East Machias River from 1/4 of a mile above the Route 1 bridge in East Machias to
the East Machias and T.18, E.D., B.P.P. town line, and from the T.19 E.D., B.P.P. and Wesley town line to the
outlet of Crawford Lake in Crawford, excluding Hadley Lake;
4. Fish River. The Fish River from the bridge in Fort Kent Mills to the outlet of Eagle Lake in Wallagrass, and
from the Portage Lake and T.14, R.6 town line to the Portage Lake and T.13, R.7 W.E.L.S. town line, excluding
the Portage Lake;
5. Machias River. The Machias River from the Whitneyville and Machias town line to the Northfield T.19, M.D,
B.P.P. town line;
6. Mattawamkeag River. The Mattawamkeag River from the outlet of Mattakeunk Stream in Winn to the
Mattawamkeag and Kingman Township town line, and from the Reed Plantation and Bancroft town line to
the East Branch, including its tributaries in the West Branch from the Mattawamkeag River to the Haynesville
T.3, R.3, W.E.L.S. town line and from its inlet into Upper Mattawamkeag Lake to the Route 2 bridge; the East
Branch from the Mattawamkeag River to the Haynesville and Forkstown Township town line and from the
T.4, R.3 W.E.L.S. and Oakfield town line to Red Bridge in Oakfield; the Fish Stream from the Route 95 bridge
in Island Falls to the Crystal-Patten town line, and the Baskehegan Stream from its inlet into Crooked Brook
Flowage in Danforth to the Danforth and Brookton Township town line;
7. Narraguagus River. The Narraguagus River from the ice dam above the railroad bridge in Cherryfield to the
Beddington and Devereaux Township town line, excluding Beddington Lake;
8. East Branch of Penobscot. The East Branch of the Penobscot from the Route 157 bridge in Medway to the
East Millinocket and Grindstone Township town line;
9. Pleasant River. The Pleasant River from the railroad bridge in Columbia Falls to the Columbia and T.18, M.D.,
B.P.P. town line, and from the T.24, M.D., B.P.P. and Beddington town line to the outlet of Pleasant River
Lake;
10. Rapid River. The Rapid River from the Magalloway Plantation and Upton town line to the outlet of Pond in
the River.
11. West Branch Pleasant River. The West Branch Pleasant River from the East Branch to the Brownville and
Williamsburg Township town line; and
12. West Branch of Union River. The West Branch of the Union River from the Route 9 bridge in Amherst to the
outlet of Great Pond in the Town of Great Pond.