Application for Site Design Review
Washburn, Maine
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 294dda1b5938 · verified 2026-10-20 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of | Application Number
| Fee
Washburn Received by CEO
Date
THE INITIAL DETERMINATION OF THE COMPLETENESS OF THE APP. WAS MADE BY CEO:
DATE: RECEIVED BY PLANNING BOARD: |
APPLICATION FOR SITE DESIGN REVIEW |
This application shall conform in all respects to the Zoning Ordinance and Site design Review Ordinance
of the Town of Washburn, and shall be submitted as indicated below. If an application has been or will
be filed with the Maine State Department of Environmental Protection, the questions following may be
answered by reference to said application. In this case a copy of said application should always be
attached hereto. If the question does not apply to your application enter NA into the blank.
Site Design Application Requirements. (Please check one of the following)
Concept Site Design Review Final Site Design Review
A. Required Number of Copies. | . |
Final application for Site Design Review shall consist of five (5) copies of the required information.
_.....~.-Lhe-applications-are-to-be-submitted-to-the-Code-Enforcement. Officer_no.laterthan twenty-one (21)...
days prior to the meeting at which the item is to be heard.
B. Concept Site Design Plan. |
1. The Planning Board may review application as concept site design plans. These are applications
that do not meet the final plan requirements. At a minimum, concept plan applications shall
include the following information:
; a. Concept Site Design Plan
1. Name and address of the owner of record and developer (if different);
2. Name of the proposed development;
3. Names and addresses of all abutting property owners directly across any public way, and
others indicated by the Planning Board as impacted; (if there is not enough room use
| back of sheet)
a
, SITE DESIGN -- PAGE 2
4. Names and addresses of all consultants working on the project;
a
5. Graphic scale and north arrow;
6. Acopy of the deed to the property, option to purchase the property, or other documentation
to demonstrate right, title or interest in the property on the part of the applicant;
7. Location and dimensions of any existing or proposed easements and copies of existing
covenants or deed restrictions;
_______ 8. Name, registration number, and seal of the land surveyor, architect, engineer, and/or similar
professional who prepared the plan;_ .
: 9. All property boundaries, land area, and zoning designations of the site, regardless of whether
all or part is being developed at this time;
10. Size, shape, and location of existing and proposed buildings on the site including dimensions
of the buildings and setbacks from property lines;
11. Location and layout design of vehicular parking, circulation areas, loading areas, and
walkways including curb cuts, driveways, parking space and vehicle turn around area
dimensions;
12. Location and names of roads and rights-of-way within a 200' adjacent to the proposed
development;
13. Proposed finish grades and graphic arrows indication the directions of storm water runoff;
a
14, Conceptual treatment of on and off site storm water management facilities:
15. Location and sizes of existing and proposed sewer and water services including connections:
a a
16. Conceptual treatment of landscaping buffers, screens and plantings;
17. Location of outdoor storage areas, fences signs (front view and dimensions), advertising
features, and solid waste receptacles; _
| SITE DESIGN -- PAGE 3
18. Context map illustrating the area surrounding the site which will be affected by the proposal
including all roads, sidewalks, intersections, storm water drainage ways, sanitary sewer lines
and pump stations, nearby properties and buildings zone districts, and geographic features such
as, but not limited to, wetlands, natural features, historic sites, flood plains, significant scenic
areas, and significant wildlife habitats as provided in the Comprehensive Plan;
~----="""""""T9. Plans for all proposed exterior lighting including 'the location, type of light, radius of light,
manufacturer's specifications sheet, and the ground level intensity in foot-candles.
b. Projection Description. . .
The projection description is to describe the proposal, its scheme of development, and proposed
land uses. The project description shall also include estimates from qualified professionals as to
the anticipated gallons per day if wastewater, the number of vehicles entering and leaving the site
during the day (and at peak traffic hours), the increased amount of storm water runoff and the
rate of the storm water runoff of the post-development site.
c. FINAL SITE DESIGN PLAN
The final site design plan application shall include all information required in Section 8.7(B),
above and in addition shall require the following information:
a. Boundary Survey: Prepared by a licensed Maine surveyor indicating the boundaries,
permanent markers, and encumbrances of the site. _
b. Storm Water Management Plan: Prepared by a Maine licensed professional engineer
analyzing the proposal's impact on existing storm water facilities and watersheds. The storm _
management plan shall include a map of all watersheds significantly impacted by proposal and
identify all areas of existing or anticipated flooding, locations of existing and proposed culverts,
pipes, detention ponds, and flow restrictions to be affected by the proposal. The storm water
management plan shall comply with the review criteria found in this Ordinance.__
c. Finish Grading Plan: Prepared by a Maine licensed professional engineer or landscape
architect indicating the grading of the site, the amount of fill to be imported to or exported from
the site, and graphic arrows indicating the direction of storm water run off.
d. Site Improvement Details: Including sufficient information to enable the creation of an
itemized cost estimate for all required on/or off site improvements.
e. Building Elevation: Scale plans of exterior building surfaces including materials, doorways,
and advertising features.
f. Additional Information: Additional information as deemed necessary to review the
proposal's conformance with the site design review criteria and technical standards. Additional
oer eet ee information.may-address-items.such.as, but.not.be_limited_to, traffic, wetlands, environmental _
, analyses, or the interpretation of the data by Town consultants. Additional information shall
be financed pursuant to the consulting fees or this Ordinance.
| FINAL SITE DESIGN -- PAGE 4 | |
g. General topography ofthesite.
- h. .. High intensity soils classifications of the soils located on the site. ee
i. A copy of any variances granted or deed restrictions on the subject use or property.
a Such variances and/or restrictions shall be noted on the final (recording) copy of the
plan. _
D. Waiver of Required Information |
The planning Board may waive the submittal of required application materials for
developments upon finding that the specific information is unnecessary in order to
review the application's conformance with this Ordinance. Such waiver(s) shall be
noted on the final (recording) copy of the plan. © :
E. Final Copies of the Plan a
The applicant shall submit three (3) signed copies of the final approved plan to the Code
Enforcement Officer. One copy shall be retained by the Planning Board as part of its
permanent records. One copy shall be forwarded to the Tax Assessor. One copy shall
be forwarded to the Code Enforcement Officer.
co
Signature Date
All applications must be made by the owner or their agent, as designated in writing by the owner, and the
signature must be notarized.
AROOSTOOK, ss. .
Personally appeared the abovenamed and acknowledged the
foregoing to be true to the best of his/her knowledge or belief. Before me,
NOTARY PUBLIC
My Commission Expires: