This is the exact embedded text of the captured official document.
Snapshot e0e794a61f81 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
T o w n o f
W A S H I N G T O N
C o u n t y o f K n o x
S t a t e o f M a i n e
Mobile Home
Park Ordinance
P r e p a r e d b y t h e
W a s h i n g t o n P l a n n i n g B o a r d
G e o r g e V a n D e v e n t e r , C h a i r
A d o p t e d 3 / 2 3 / 1 9 9 1
E f f e c t i v e 1 / 1 / 1 9 9 0
A m e n d e d 3 / 3 1 / 2 0 0 1 & 3 / 3 0 / 2 0 1 2
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 1 -
M O B I L E H O M E P A R K O R D I N A N C E
M O B I L E H O M E P A R K O R D I N A N C E
ARTICLE I - CONTENTS OF THIS ORDINANCE
§1 Contents
ARTICLE I - CONTENTS OF THIS ORDINANCE...................................................................1
ARTICLE II - TITLE & PURPOSE .............................................................................................1
ARTICLE III - AUTHORITY, APPLICABILITY & ADMINISTRATION...............................1
ARTICLE IV - SEVERABILITY & CONFLICT........................................................................2
ARTICLE V - AMENDMENT OF THIS ORDINANCE ............................................................2
ARTICLE VI - PREAPPLICATION............................................................................................2
ARTICLE VII - MOBILE HOME PARK REVIEW....................................................................3
ARTICLE VIII - MINIMUM DESIGN & PERFORMANCE STANDARDS ............................8
ARTICLE IX - ENFORCEMENT..............................................................................................16
ARTICLE X - PERFORMANCE GUARANTEES....................................................................18
ARTICLE XI - DEFINITIONS...................................................................................................19
ARTICLE XII - INDEX OF THIS ORDINANCE.....................................................................22
ARTICLE II - TITLE & PURPOSE
§1 Title
This Ordinance shall be known and may be cited as the Town of Washington, Maine Mobile Home
Park Ordinance and will be referred to herein as "this Ordinance".
§2 Purpose
The purpose of this Ordinance is to ensure the comfort, convenience, safety, health and welfare of
the people of the town of Washington, Maine, to protect the environment and to promote the
development of an economically sound and stable community.
ARTICLE III - AUTHORITY, APPLICABILITY & ADMINISTRATION
§1 Authority
This Ordinance is enacted pursuant to Home Rule Powers as provided for in Article VIII-A of the
Maine State Constitution and under the authority granted to the Town by the statutes of the State of
Maine Title 30-A, M.R.S.A. Section 3001, and in accordance with the provisions of Title 30-A,
M.R.S.A., Section 4358, Subsection 3.
§2 Administration
The provisions of this Ordinance shall be administered by the Town of Washington, Maine Planning
Board and enforced by the Town of Washington, Maine Code Enforcement Officer.
§3 Effective Date
This Ordinance shall be effective upon its adoption by vote of the eligible voters of the Town of
Washington, Maine in Town Meeting retroactively to January 1, 1990.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 2 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
§4 Applicability to this Ordinance
A. The provisions of this Ordinance shall apply to all proposed mobile home parks and to
expansion of any existing mobile home parks within the boundaries of the Town of
Washington, Maine. Mobile home subdivisions as expressly defined in Article XI, §3 of this
Ordinance are not governed by this Ordinance, except in the case where the individual owners
form a corporate body that owns and governs said mobile home lots in common.
B. An approved mobile home park plan shall be necessary under the terms of this Ordinance,
prior to the establishment or expansion of a mobile home park, and shall consist of a site plan
as required by Article VII of this Ordinance, including all attachments, signed by the Planning
Board, and may include any conditions attached by the Planning Board.
C. An approved mobile home park plan shall not exempt an applicant from meeting other
applicable local, state or federal requirements.
ARTICLE IV - SEVERABILITY & CONFLICT
§1 Severability
Should any article of this Ordinance be declared by the courts of the State of Maine or by the courts
of the United States to be invalid, such decisions shall not invalidate any other article or provision of
this Ordinance.
§2 Conflict with other Ordinances
This Ordinance shall in no way impair or remove the necessity of compliance with any other rule,
regulation, bylaw, permit or provision of law. Where this Ordinance imposes a greater restriction
upon the use of the land, buildings or structures, the provisions of this Ordinance shall prevail.
ARTICLE V - AMENDMENT OF THIS ORDINANCE
§1 Initiation of Amendment
An amendment to this Ordinance may be initiated by:
A. The Planning Board provided that a majority of the Board has so voted; or
B. Request of the Selectmen to the Planning Board; or
C. Written petition to the Selectmen bearing signatures of registered voters of the Town of
Washington, Maine numbering at least ten percent of the number who voted in the last
gubernatorial election.
§2 Adoption of Amendment
All proposed amendments to this Ordinance shall be referred to the Planning Board for their
recommendation. The Planning Board may hold a public hearing on any proposed amendment.
Within thirty days of receiving a proposed amendment, the Planning Board shall make known their
recommendation to the Selectmen and to the Town. After receiving the recommendation of the
Planning Board, the amendment shall be voted on by the voters of the Town of Washington, Maine
at a Town Meeting, a majority vote being required for adoption.
ARTICLE VI - PREAPPLICATION
§1 Preapplication Procedure
A. Applicant presentation and submission of sketch plans.
B. Question and answer period. Board makes specific suggestions to be incorporated by the
applicant into subsequent submissions.
C. Scheduling of on-site inspection.
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 3 -
§2 Preapplication Submission
The preapplication sketch plan shall show, in simple sketch form, the proposed layout of roads, lots,
buildings and other features in relation to existing conditions. The sketch plan, which may be a
free-hand pencilled sketch, should be supplemented with general information to describe or outline
the existing conditions of the site and the proposed mobile home park. It is recommended that the
sketch plan be superimposed on or accompanied by a copy of the Assessor's Map(s) on which the
land is located. The sketch plan shall be accompanied by a copy of a portion of the U.S.G.S.
topographic map of the area showing the outline of the proposed mobile home park.
§3 Contour Interval and On-Site Inspection
Within thirty days, the Board shall determine and inform the applicant in writing of the required
contour interval on the mobile home park plan. The Board or its designated agent shall, at its
earliest convenience and normally within 30 days, make an on-site inspection. If any conditions
such as snow exist to prevent an adequate inspection in the opinion of the Board, the applicant shall
be notified in writing, and any time limits for review shall be extended accordingly until an on-site
inspection can be made. The applicant shall place "flagging" at the centerline of any proposed
roads, and at the approximate intersections of the road centerlines and lot corners, prior to the on-
site inspection.
§4 Rights not Vested
The submittal or review of the preapplication sketch plan shall not be considered the initiation of the
review process for the purposes of bringing the plan under the protection of Title 1, M.R.S.A., §302.
ARTICLE VII - MOBILE HOME PARK REVIEW
§1 Applicability of Article VII
The provisions of this article shall be in lieu of the review requirements of the Subdivision
Ordinance.
§2 Application
Prior to the establishment or expansion of a mobile home park, an applicant shall apply for an
approved mobile home park plan, which application shall include two reproducible, stable based
transparent originals, one to be recorded at the Knox County Registry of Deeds and one to be filed
at the Washington Town Office, and three copies on paper, of a site plan, no larger than 24 by 36
inches in size, and having a margin of two inches outside the border line on the left side for binding
and a one inch margin outside the border on the remaining sides with space reserved on the plan for
the endorsement of the Planning Board; one copy of the plan reduced to a size of 81/2 by 11 inches
or 11 by 17 inches for each Planning Board Member's use; other plans and elevations necessary to
describe the proposed project; all plans drawn to a scale of not more than one hundred feet to the
inch; and containing the following information, where applicable, and any other information that
may be required by Article VIII of this Ordinance:
A. Name, address and telephone number of the applicant, and the name, address and telephone
number of the owner of the property, if different from the applicant.
B. The date the plan was prepared with the name, address and telephone number of the person or
company that prepared such.
C. Scale of the drawings submitted and compass rose; all dimensions to be marked in feet or
decimals of a foot.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 4 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
D. Contour lines showing elevations in relation to mean sea level at appropriate intervals to show
the effect on the land of existing and proposed grades for areas proposed to be excavated or
filled.
E. Boundaries of the tract of land showing lot lines, abutting lots, districts within 1,000 feet as
defined by the Land Use Ordinance and illustrated on the Town of Washington Tax
Assessor's Maps, with total acreage indicated and the Town of Washington Tax Assessor's
map and lot number(s). The Planning Board may require a survey by a licensed surveyor.
F. Verification of right, title or interest the applicant has in the property.
G. A copy of the deed or deeds of the property together with copies of all covenants or deed
restrictions, easements, rights-of-way, or other encumbrances currently affecting the property.
H. Location of existing and proposed mobile homes and other structures.
I.
Location of buildings or other structures on abutting properties within 300 feet of the property
lines of the proposed park.
J.
Location of existing public and private streets, roadways and rights-of-way.
K. Location of proposed access road to the mobile home park from public streets or roadways.
L. The following disclaimers shall be attached to the plan to be recorded at the Registry of Deeds
and filed with the municipality as well as any other notes or conditions of approval:
1.
"The land within the park shall remain in a unified ownership and the fee to lots or
portions of lots shall not be transferred."
2.
"No dwelling unit other than a manufactured housing unit shall be located within the
park."
To any plan showing existing or proposed private roads:
3.
"All roads in this mobile home park so marked shall remain private roads to be
maintained by the developer or the lot owners and shall not be accepted or maintained
by the Town of Washington, Maine."
M. An estimate of the average daily traffic projected to be generated by the park and a traffic
impact analysis, if required, as stated by Article VIII, § 6-F of this Ordinance.
N. Location and arrangement of proposed off-street parking and loading areas and their
appurtenant drives and maneuvering areas.
O. Location of existing and proposed pedestrian walkways.
P. Location of existing and proposed utilities and easements therefore, including sanitary
sewerage, water supply, and electricity.
Q. Location, intensity, type, size and direction of all outdoor lighting.
R. Location and size of signs and all permanent outdoor fixtures.
S. Location and proposed use of areas proposed for outdoor recreation or for reserved open space
as per Article VIII, §5 of this Ordinance.
T. Location and type of existing and proposed fences, hedges, and trees of 36-inch diameter and
over at a point four and one half feet above ground level.
U. Location of existing natural drainage ways and proposed storm drainage facilities, including
dimensions of culverts, pipes, etc.; if any portion of the mobile home park is in a flood-prone
area, the boundaries of any flood hazard areas and the 100-year flood elevation shall be
delineated on the plan.
V. An analysis of ground water impact if required by Article VIII, §7-A of this Ordinance.
W. Information about Soils Conditions on the site of the proposed mobile home park. For
subsurface sewage disposal proposed, the information shall include evidence of soil suitability
according to the standards established in Article VIII, §11 of this Ordinance. The Site Plan
shall show the location of soil test areas and natural wet areas.
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 5 -
X. A soil erosion and sedimentation control plan, prepared in accordance with the standards
contained in the latest revision of the Environmental Quality Handbook published by the
United States Soil Conservation Service.
Y. A "Preservation of Natural and Historic Features" map as required by Article VIII, §9 of this
Ordinance.
Z. For projects within lake watershed districts a phosphorus control analysis and plan shall be
submitted for review and approval.
§3 Application Procedures
A. Submission of Application
1.
Applications for mobile home park permits shall be submitted to the Chairman of the
Planning Board who shall issue to the applicant a dated receipt. Within 30 days from the
date of receipt, the Planning Board shall notify the applicant in writing either that the
application is complete or, if the application is incomplete, the specific additional
material needed to make a complete application. Determination by the Planning Board
that the application is complete in no way commits or binds the Planning Board as to the
adequacy of the application to meet the criteria of the Subdivision Law, Title 30-A,
M.R.S.A., Sections 4401-4407 or of this Ordinance. The Planning Board shall make a
determination as to the completeness of the application. The applicant assumes all
responsibility as to its completeness.
2.
The application shall be accompanied by a fee in accordance with a fee schedule
determined by the Board of Selectmen [Amended from $15.00 30 March 2012], lawful
currency of the United States of America, per proposed lot or unit to be located in the
proposed mobile home park. All checks, money orders or bank drafts shall be made
payable to the Town of Washington, Maine. If a public hearing is deemed necessary by
the Planning Board, an additional fee shall be required to cover the costs of advertising,
postal notification and dissemination of information.
B. Public Hearing
In the event that the Planning Board determines to hold a public hearing on the proposed
mobile home park, it shall hold such public hearing within thirty days of having notified the
applicant in writing that a complete application has been received and shall cause notice of the
date, time and place of said hearing, together with information about the proposed mobile
home park regarding its location both by address and map and lot number from the Town of
Washington, Maine Tax Assessor's Map, the number of proposed units or lots to be contained
therein, the number and length of new roadways to be contained therein and any other
information deemed pertinent to be given in writing to the applicant, all property owners
within 3,000 feet of the boundaries of the proposed mobile home park, the Selectmen, Code
Enforcement Officer, Road Commissioner, Superintendent of MSAD 40, Maine State Police,
Knox County Sheriff and published in a newspaper of general circulation in the Town of
Washington, Maine at least two times; the date of the first such publication shall be at least
seven days prior to the hearing. The decision to hold a public hearing is discretionary, and in
making its decision, the Planning Board may consider the size and type of the proposed
mobile home park, the community impact, and whether any written requests for such a
hearing from citizens of the Town of Washington, Maine have been received. Public hearings
shall be conducted in accordance with the procedures in Title 30-A, M.R.S.A., Section 2691.
C. Planning Board Decision on the Mobile Home Park Application
1.
The Planning Board shall, within thirty days of a public hearing, or within sixty days of
having received a complete application, if no hearing is held, or within such other time
limit as may be mutually agreed to by said Planning Board and applicant, issue an order
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 6 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
denying or granting approval of the proposed mobile home park, or granting approval on
such terms or conditions as it may deem advisable to satisfy the criteria contained in this
Ordinance and in the Subdivision Law, Title 30-A, M.R.S.A., Sections 4401-4407, and
to preserve the public's health, safety, and general welfare. In all instances, the burden
of proof shall be upon the applicant. In issuing its decision, the Planning Board shall
make a written finding of fact establishing that the proposed mobile home park does or
does not meet the provisions of this Ordinance.
2.
Upon approval of the mobile home park, a majority of the Board shall sign all copies of
the development plan. The original shall be filed by the applicant with the Knox County
Registry of Deeds. One copy shall be retained by the applicant, one copy shall be
retained by the Planning Board, one copy shall be filed with the Tax Assessor, and one
copy shall be filed with the Code Enforcement Officer. The Planning Board shall
maintain a permanent record of their action on the mobile home park. Any plan not
recorded within 90 days with the Knox County Registry of Deeds shall be null and void.
3.
Approval by the Planning Board of a mobile home park plan shall not be deemed to
constitute or be evidence of any acceptance by the Town of Washington, Maine of any
road, easement, or other open space shown on such plan.
D. Construction limitations
1.
Construction of the proposed mobile home park is subject to the provisions of Article
IX, §2-D of this Ordinance.
2.
After approval of the mobile home park, and before any construction begins, the
applicant shall apply for and receive all applicable permits as may be required by the
Land Use Ordinance, the Subdivision Ordinance or any other Town, state or federal
regulations, laws or ordinances regulating such developments and that said permits shall
be displayed in a conspicuous place at the site of the proposed mobile home park, visible
to all who enter said site for the purposes of construction, inspection and review.
E. Expiration of Approval
All approvals shall expire within one year of the date of issuance unless work thereunder is
commenced within one year from the date of approval. If work is not completed within two
years from the date of approval, a new application must be made.
F. Plan Revisions after Approval
Plan revisions after approval shall be made as further provided for in Article IX, §3 of this
Ordinance.
G. Limitation on Units
After the effective date of this Ordinance as stipulated in Article III, §3 of this Ordinance,
mobile and modular homes as defined by Article XI, §3 of this Ordinance, and mobile homes
meeting the safety standards contained in Article VIII, §10 of this Ordinance, may be located
in a mobile home park sited within the Town of Washington, Maine. Excepting any units
legally sited as of the effective date of this Ordinance as stipulated in Article III, §3 of this
Ordinance, no manufactured housing unit which fails to meet the definition of mobile or
modular home contained in Article XI, §3 of this Ordinance, or which otherwise fails to meet
the safety standards contained in Article VIII, §10 of this Ordinance, travel trailers, units not
suitable for year-round occupancy, or site built home shall be located in a mobile home park
situated within the Town of Washington, Maine.
H. Expert Witnesses and Opinions
The Planning Board shall retain the right to call, cite, reference, examine, cross-examine,
quote, or question any authority, expert, professional, or experienced individual of their choice
who, in their sole opinion, may have pertinent information regarding the proposed mobile
home park, at any time during the approval process or during the construction process; all
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 7 -
costs of such shall be borne by the developer of the proposed mobile home park. Consultation
shall be sought first from sources without fees.
§4 Appeals and Variances
A. Administrative Appeals
1.
Any person aggrieved by an action from determinations of the Planning Board pursuant
to this Ordinance may file an application for appeal in writing within 30 days of the
granting or denial of approval from the Planning Board. The applicant shall file this
appeal with the Chairman of the Board of Appeals, who shall issue a dated receipt and
who shall, within 7 days of the date of receipt, notify the applicant in writing that either
the application is complete or, if the application is incomplete, the specific additional
material needed to make a complete application.
2.
The fee to accompany applications for appeal shall be in accordance with a fee schedule
determined by the Board of Selectmen [Amended from $25.00 30 March 2012], lawful
currency of the United States of America. All checks, money orders or bank drafts shall
be made payable to the Town of Washington, Maine. An additional fee shall be required
to cover the costs of advertising, postal notification and dissemination of information for
the appeals hearing.
3.
The Board of Appeals shall, upon complete written application of an aggrieved party and
after public notice, hear appeals from determinations of the Planning Board in the
administration of this Ordinance within 30 days of such application. Such hearing shall
be held in accordance with Maine State Law. The board shall cause notice of the date,
time and place of said hearing, the location of the proposed mobile home park, and the
general nature of the question involved to be given in writing to the applicant of the
appeal and published in a newspaper of general circulation in the Town of Washington,
Maine at least two times; the date of the first such publication shall be at least seven (7)
days prior to the hearing. The Board shall also cause notice of the hearing be given to
the Selectmen, the Planning Board, the Code Enforcement Officer, and all property
owners within 3,000 feet of the boundaries of the proposed mobile home park at least 14
days prior to the date of the hearing.
4.
If such application for appeal is not made within the stated time, the prior decision of the
Planning Board shall be final.
5.
Following such hearing, the Board of Appeals may reverse the decision of the Planning
Board only upon a finding in fact that the decision of the Planning Board is clearly
contrary to specific provisions of this Ordinance. The Board of Appeals shall render a
decision in writing to the applicant, Planning Board Chairman, Code Enforcement
Officer, and the Selectmen within 30 days of the appeal hearing.
B. Variances
1.
The Board of Appeals may, upon written application and hearing as outlined in Article
VII, § 4-A of this Ordinance grant a variance from the strict application of the
dimensional requirements of this Ordinance, including lot sizes, setbacks, site distances,
lot coverage by structures, sign requirements, and parking requirements only if the strict
application of the terms of this Ordinance would result in undue hardship, as defined in
Article XI, § 3 of this Ordinance, to the applicant.
2.
Variances are not justified unless all elements of undue hardship, as defined in Article
XI, § 3 of this Ordinance are present in the case.
3.
Variances to relieve economic hardship or to alleviate economic inconvenience, or to
make a project economically viable, or to enhance economic viability, are prohibited.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 8 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
4.
Following the public hearing, as outlined in Article VII, § 4-A of this Ordinance, the
Board of Appeals shall render a decision to grant a variance in writing to the applicant,
Planning Board Chairman and the Selectmen within 30 days of the appeal hearing.
C. Appeal to Superior Court
Any aggrieved party having proper standing may appeal any decision of the Appeals Board
under this Ordinance to the Superior Court of Knox County, within thirty days of a written
decision in accordance with Maine State Law.
D. Any appeal or variance granted contrary to the standards set forth in this Ordinance, except as
noted in Article VII, §4 of this Ordinance, shall be null and void.
ARTICLE VIII - MINIMUM DESIGN & PERFORMANCE STANDARDS
§1 General Requirements
A. Except as stipulated below, mobile home parks shall meet all the requirements for a residential
subdivision, and shall conform to all applicable State laws and local ordinances or regulations
and shall be in conformity with the Land Use Ordinance of the Town of Washington, Maine.
Where the provisions of this article conflict with specific provisions of the Subdivision
Ordinance, or of the Land Use Ordinance, the provisions of this article shall prevail.
B. Where a developer elects to create a mobile home park where all land is under one ownership,
the park plan shall show lots and the developer shall demonstrate that the development
standards described herein are met.
C. The owner or operator of a mobile home park shall be responsible for ensuring the
maintenance of all infrastructure, structures and their sites, including snow removal from all
park roads and walkways and sanding where required. Park management shall conform to
Maine State Laws. Compliance with this Ordinance shall not exempt the park owner,
developer, or manager from complying with other applicable local, state, and federal codes
and regulations.
D. No manufactured housing may be sited within the Town of Washington, Maine without either
a bill of sale indicating the name, address, dealer registration number and sales tax certificate
number of the person who sold or provided the manufactured housing to the buyer locating
such housing in this Town; or evidence of certification of payment of the sales tax in
accordance with Title 36, M.R.S.A., Section 1760, Subsection 40 and Title 36, M.R.S.A.,
Section 1952-B. A copy of each document required for each housing unit shall be filed with
the Code Enforcement Officer prior to the siting of said unit.
E. Mobile home parks shall be considered an allowable use within the Rural-Commercial or
Rural Districts of the Town of Washington, Maine as defined in the Land Use Ordinance and
as illustrated on the Town of Washington, Maine Tax Assessor's Maps; they shall be
considered a conditional use in the Farm and Forest District; they shall be specifically
prohibited from the Village, Shoreland, Watershed, Conservation, and Historic Districts as
well as any other environmentally sensitive areas, as defined in Article XI, § 3 of this
Ordinance.
§2 Lot Area, Lot Width and Lot Coverage Requirements
Lots in a mobile home park shall meet the following lot area and lot width requirements.
A. Lots served by public sewer:
Min. lot area:...............................................6,500 square feet
Min. lot width: .................................................50 feet
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 9 -
B. Lots served by individual subsurface waste water disposal systems
Min. lot area:.............................................20,000 square feet
Min. lot width: ...............................................100 feet
C. Lots served by a central subsurface waste water disposal system approved by the Maine
Department of Human Services:
Min. lot area:.............................................12,000 square feet
Min. lot width: .................................................75 feet
D. The overall density of any park served by any subsurface wastewater disposal system shall not
exceed one dwelling unit per 20,000 square feet of total park area.
E. The overall density of the mobile home park shall be the combined area of its mobile home
lots plus the sum of the area required for road rights-of-way, the area required for buffer strips
(if any), the open space area as defined in Article VIII, §5-A of this Ordinance (if the park is
served by a public sewer), and the area within the shoreland setback as defined in the Land
Use Ordinance.
F. Where lots front on a curved right-of-way or are served by a driveway, the frontage
requirement shall be measured in a straight line perpendicular to the front of the manufactured
home.
G. Lots located within any shoreland zoning district shall meet the lot area, lot width and shore
frontage requirements for that district.
H. All buildings on the mobile home lot, including accessory buildings and structures, but
excluding open decks and parking spaces, shall not cover more than 50% of the lot area.
§3 Unit Setback Requirements
A. The following minimum unit setbacks shall apply to all homes and accessory buildings
located in the mobile home park:
Lots served by public sewer
All other lots
Front setback....................................................20 feet.....................................20 feet
Side setback .....................................................10 feet.....................................20 feet
Rear setback.....................................................10 feet.....................................10 feet
B. So as to avoid monotony and sameness, the Planning Board may allow the front setback on a
private road within the mobile home park to be varied provided that no home may be closer
than 10 feet from the right-of-way and the average distance is at least 20 feet for all units.
C. On lots which abut a public way either within the park or adjacent to the park, or on lots
which are located within a shoreland zoning district, structures shall meet the setback
requirements and setback from high water mark requirements in the Land Use Ordinance for
the respective district those lots are located in.
D. The Planning Board may allow unit side yard setbacks to be reduced to 5 feet provided a
distance of 20 feet is maintained between units for the purpose of providing more useable yard
space on one side of a home.
E. A minimum 20 foot separation shall be maintained between all manufactured homes in all
directions.
§4 Buffering
If a park is proposed with a residential density at least twice the density of adjacent development in
existence, or at least twice the density permitted in the zoning district in which the park is located if
the neighboring land is undeveloped, the park shall be designed with a continuous landscaped area
not less than fifty feet in width which shall contain no structures or streets.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 10 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
§5 Open Space Reservation
For mobile home parks served by a public sewer:
A. An area no less than 10% of the total area of the mobile home park lots shall be reserved as
open space. The area reserved as open space shall be maintained and used for its stated
purpose. Parking space, driveways and streets and buffer areas are not considered useable
open space but community recreation buildings, pools and courts are considered as open
space.
B. At least 50% of the reserved open space shall have slopes less than 5%, shall not be located
on poorly or very poorly drained soils, and shall be accessible directly from roads within the
park.
C. All developed open space shall be designed and landscaped for the use and enjoyment of the
park residents and shall be maintained for their long term use. Plans for these areas shall be
submitted in the approval application.
D. To the maximum extent possible, undeveloped open space shall be left in its natural state.
Improvements to make trails for walking and jogging or to make picnic areas are permitted.
Plans for these areas shall be submitted in the approval application.
E. The developer shall submit as part of the application, a copy of that portion of the proposed
mobile home park rules and a plan which specify how the open space is to be used and
maintained and what conditions are to apply to its use. The plan shall specify the areas to be
dedicated to open space, recreation, and storage.
F. The Planning Board may waive the requirement for open space when the park is located
within one half mile of a publicly owned recreation area of equal or greater area.
G. Reserved open space shall not be used for future mobile home lots.
§6 Road Design, Circulation, Traffic Impacts and Parking
Roads within a park shall be designed by a Professional Engineer, registered in the State of Maine.
A. Roads which the applicant proposes to be dedicated as public ways shall be designed and
constructed in accordance with the standards for roads as detailed in Article XII of the
Subdivision Ordinance.
B. Roads which the applicant proposes to remain private ways shall meet the following minimum
design standards.
1.
For two way roads:
i. Minimum right of way width:..............23 feet
ii. Minimum width of traveled way: ........20 feet
2.
For one way roads:
i. Minimum right of way width:..............18 feet
ii. Minimum width of traveled way: ........14 feet
3.
Cul-de-sac turnarounds shall have a minimum radii of 50 feet at the outer edge of the
pavement, exclusive of any parking areas.
4.
The surfacing of all private roads shall be constructed in accordance with Article XII, §3
of the Subdivision Ordinance.
5.
The park owner or management shall be responsible for snow removal and sanding on
all park roads.
C. Any mobile home park expected to generate average daily traffic of 200 trips per day or more
shall have at least two road connections with existing public roads. Any road within a park
with an average daily traffic of 200 trips per day or more, shall have at least two road
connections leading to existing public roads, other roads within the park, or other roads shown
on an approved subdivision plan.
D. No individual lot within a park shall have direct vehicular access onto an existing public road.
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 11 -
E. The intersection of any road within a park and an existing public road shall meet the following
standards.
1.
The desired angle of intersection shall be 90°. The minimum angle of intersection shall
be 75°.
2.
The maximum permissible grade within 75 feet of the intersection shall be 2%.
3.
A minimum sight distance of 10 feet for every mile per hour of posted speed limit on the
existing road shall be provided. Sight distances shall be measured from the driver's seat
of a vehicle that is 10 feet behind the curb or edge of shoulder line with the height of the
eye 31/2 feet above the pavement and the height of object 41/4 feet.
4.
The center line of any road within a park intersecting an existing public road shall be no
less than 125 feet from the center line of any other road intersecting that public road.
5.
No connection of a road within a mobile home park shall be made with any public road
unless the public road meets or exceeds the standards for roads in Article XII of the
Subdivision Ordinance.
6.
Where necessary to safeguard against hazards to traffic, pedestrians and/or to avoid
traffic congestion, turning lanes, traffic directional islands, frontage roads, and traffic
controls shall be provided on public roads at the developers expense.
F. The application shall contain an estimate of the average daily traffic projected to be generated
by the park. Estimates of traffic generation shall be based on the Trip Generation Manual,
1987 edition, published by the Institute of Transportation Engineers. If the park is projected
to generate more than 400 vehicle trip ends per day, the application shall also include a traffic
impact analysis, by a professional engineer registered in the State of Maine with experience in
transportation engineering.
G. Each lot shall be legibly marked for identification, and easily accessible to emergency
vehicles, permitting fire apparatus and emergency vehicles to approach within 100 feet.
H. Curvilinear roads shall be utilized within the park wherever possible. No road within the park
shall be more than 200 feet long without a curve or bend.
I.
All roads within the park and connecting with roads outside the park shall be marked with
signs designating their name, appropriate safety and stop signs, and with appropriate lines and
markings painted on them, all approved by the Road Commissioner. Proposed road names
shall be approved by the Planning Board.
J.
On-street parking shall be prohibited within the park unless an eight foot parking lane is
provided in addition to the road width requirements of Article VIII, §6-B of this Ordinance, in
which case on-street parking may be permitted on the side of the road where the parking lane
is located.
K. For each mobile home lot there shall be provided and maintained at least two hard surfaced
off-street parking spaces. Each parking space shall contain a minimum of 200 square feet
with minimum dimensions of 10 feet by 20 feet. This requirement may be waived if a parking
lane is provided that supplies an equivalent number of parking spaces.
L. Guest and service parking shall be provided within the boundaries of the park at a ratio of one
space for every four mobile home lots. Such parking shall be hard surfaced and the spaces
shall be marked and reserved for that sole use. These parking spaces shall be off-street unless
a parking lane is provided that supplies the equivalent number of spaces in addition to those
required under Article VIII, §6-K.
M. The mobile home park shall contain pedestrian walkways that link all units and all service and
recreational facilities. Such walkways shall be adequately surfaced and lit. A portion of the
road surface may be reserved for walkways provided the roadway width is increased and
marked accordingly. Walkways shall be a minimum width of 3 feet and shall be constructed
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 12 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
in accordance with Article XII, §2-K of the Subdivision Ordinance. The park owner or
management shall be responsible for snow removal on all park walkways.
N. Outdoor lighting shall be provided to adequately illuminate internal streets and pedestrian
walkways. Lights shall be sized and directed to avoid adverse impact on adjacent properties.
Lighting costs and maintenance are the responsibility of the park management.
§7 Ground Water Impacts
A. Assessment Submitted
Accompanying the application for approval of any mobile home park which is not served by
public sewer shall be an analysis of the impacts of the proposed mobile home park on ground
water quality. The hydrogeologic assessment shall be prepared by a certified geologist or
professional engineer registered in the State of Maine, experienced in hydrogeology and shall
contain at least the following information.
1. A map showing the basic soils types.
2. The depth to the water table at representative points throughout the mobile home park.
3. Drainage conditions throughout the mobile home park.
4. Data on the existing ground water quality, either from test wells in the mobile home park
or from existing wells on neighboring properties.
5. An analysis and evaluation of the effect of the mobile home park on ground water
resources. The evaluation shall, at a minimum, include a projection of post development
nitrate-nitrogen concentrations at any wells within the mobile home park, at the mobile
home park boundaries and at a distance of 1000 feet from potential contamination
sources, whichever is a shorter distance. For mobile home parks within the watershed of
a lake, projections of the development's impact on groundwater phosphate
concentrations shall also be provided.
6. A map showing the location of any subsurface wastewater disposal systems and drinking
water wells within the mobile home park and within 200 feet of the mobile home park
boundaries.
B. Standards for Acceptable Ground Water Impacts
1. Projections of ground water quality shall be based on the assumption of drought
conditions (assuming 60% of annual average precipitation).
2. No mobile home park shall increase any contaminant concentration in the ground water to
more than one half of the Primary Drinking Water Standards. No mobile home park
shall increase any contaminant concentration in the ground water to more than the
Secondary Drinking Water Standards.
3. If ground water contains contaminants in excess of the primary standards, and the mobile
home park is to be served by on-site ground water supplies, the applicant shall
demonstrate how water quality will be improved or treated.
4. If ground water contains contaminants in excess of the secondary standards, the mobile
home park shall not cause the concentration of the parameters in question to exceed
150% of the ambient concentration.
C. Subsurface waste water disposal systems and drinking water wells shall be constructed as
shown on the map submitted with the assessment. If construction standards for drinking water
wells are recommended in the assessment, those standards shall be included as a note on the
Plan.
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 13 -
§8 Conversion
No development or subdivision which is approved under this Ordinance as a mobile home park may
be converted to another use or individual lots sold without the approval of the Planning Board, and
meeting the appropriate lot size, lot width, setback and other requirements of the applicable district.
§9 Preservation of Natural and Historic Features
The Planning Board shall require that the proposed park include a landscape and management plan
that will show the preservation of scenic, historic or environmentally desirable areas or any areas
identified in the Comprehensive Plan or by the Maine Critical Areas Program as rare and
irreplaceable areas.
§10 Safety Standards
The standards in Article VIII, §10 shall apply to all manufactured housing built before June 15,
1976, or any manufactured housing not built according to the National Manufactured Housing
Construction and Safety Standards Act of 1974, United States Code, Title 42, Chapter 70, to be
located in a mobile home park in the Town of Washington, Maine. The park owner shall have the
burden of proving to the Code Enforcement Officer that these standards are met.
A. Exit Facilities - Exterior Doors
1.
Required egress doors shall not be located where a lockable interior door must be used
in order to exit.
2.
Homes shall have a minimum of two exterior doors not less than twelve feet from each
other as measured in any straight line direction regardless of the length of travel between
doors. One of the required exit doors must be accessible from the doorway of each
bedroom without traveling more than 35 feet.
3.
All exterior swinging doors shall provide a minimum 28 inches wide by 74 inches high
clear opening. All exterior sliding glass doors shall provide a minimum 28 inches wide
by 72 inches high clear opening. Locks shall not require the use of a key for operation
from the inside.
B. Exit Facilities - Egress Windows and Devices
Mobile homes shall have the following emergency egress facilities:
1.
Every room designated expressly for sleeping purposes, unless it has an exit door, shall
have at least one outside window or approved exit device. If an exit window or device is
installed, it shall be listed in accordance with procedures and requirements of AAMA
1704-1985.
2.
The bottom of the window opening shall not be more than 36 inches above the floor.
3.
Locks, latches, operating handles, tabs and any other window, screen or storm window
devices, which need to be operated in order to permit exiting, shall not be located in
excess of 54 inches from the finished floor.
C. Interior Doors
Each interior door, when provided with a privacy lock, shall have a privacy lock that has an
emergency release on the outside to permit entry when the lock has been locked by a locking
knob, lever, button or other locking devices on the inside.
D. Fire Detection Equipment
1.
At least one smoke detector (which may be a single station alarm device) shall be
installed in the home in the following locations:
i. A smoke detector shall be installed on any wall in the hallway or space
communicating with each bedroom area between the living area and the first bedroom
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 14 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
door unless a door separates the living area from that bedroom area, in which case the
detector shall be installed on the living area side as close to the door as practical.
Homes having bedroom areas separated by any one or combination of communication
areas such as kitchen, dining room, living room, or family room (but not a bathroom or
utility room) shall have at least one detector protecting each bedroom area.
ii. When located in hallways, the detector shall be between the return air intake and the
living area.
iii. The smoke detector shall not be placed in a location which impairs its effectiveness.
iv. Smoke detectors shall be labeled as conforming with the requirements of
Underwriters Laboratory Standards No. 217, Third Edition, 1985, as amended through
October 8, 1985, for single and multiple station smoke detectors.
v. Each smoke detector shall be installed in accordance with its listing. The top of the
detector shall be located on a wall four inches to twelve inches below the ceiling.
However, when a detector is mounted on an interior wall below a sloping ceiling, it
shall be located four inches to twelve inches below the intersection on the connecting
exterior wall and the sloping ceiling (cathedral ceiling). The required detector(s) shall
be attached to an electrical outlet box and the detector connected by permanent wiring
method into a general electrical circuit. There shall be no switches in the circuit to the
detector between the over-current protection device protecting the branch circuit and
the detector. The smoke detector shall not be placed on the same branch circuit or any
circuit protected by a ground fault circuit interrupter.
E. Flame Spread
1.
Ceiling interior finish shall not have a flame spread rating exceeding 75.
2.
Walls and ceilings adjacent to or enclosing a furnace or water heater shall have an
interior finish with a flame spread rating not exceeding 25. Sealants and other trim
material two inches or less in width used to finish adjacent surfaces within this space are
exempt if supported by framing members or by materials having a flame spread rating
not exceeding 25.
3.
Exposed interior finishes adjacent to the cooking range shall have a flame spread rating
not exceeding 50.
4.
Kitchen cabinet doors, countertops, backsplashes, exposed bottoms, and end panels shall
have a flame spread rating not to exceed 200.
5.
Finish surfaces of plastic bathtubs, shower units, and tub or shower doors shall not
exceed a flame spread rating of 200.
6.
No burner of a surface cooking unit shall be closer than twelve horizontal inches to a
window or an exterior door.
F. Kitchen Cabinet Protectors
1.
The bottom and sides of combustible kitchen cabinets over cooking ranges to a
horizontal distance of six inches from the outside edge of the cooking range shall be
protected with at least 5/16 inch thick gypsum board or equivalent limited combustible
material. One inch nominal framing members and trim are exempted from this
requirement. The cabinet area over the cooking range or cooktops shall be protected by
a metal hood with not less than a three inch eyebrow projecting horizontally from the
front cabinet face. The 5/16 inch thick gypsum board or equivalent limited combustible
material which is above the top of the hood may be supported by the hood. A 3/8 inch
enclosed air space shall be provided between the bottom surface of the cabinet and the
gypsum board or equivalent limited combustible material. The hood shall be at least as
wide as the cooking range.
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 15 -
2.
The metal hood will not be required if there is an oven at least as wide as the cooking
range installed between the cabinet and the range, centered above the range.
3.
Ranges shall have a vertical clearance above the cooking top of not less than 24 inches
to the bottom of combustible cabinets.
G. Carpeting
Carpeting shall not be used in a space or compartment designed to contain only a furnace
and/or water heater. Carpeting may be installed in other areas where a furnace or water heater
is installed, provided that it is not located underneath the furnace or water heater.
H. Heating and Fuel Burning System
A person holding a master license issued by the State of Maine Oil and Solid Fuel Examining
Board shall inspect and certify in writing that the heating and fuel system meets the
requirements of NFPA-31 - Installation of Oil Burning Equipment as adopted by that Board.
I.
Electrical System
A person holding a master license issued by the State of Maine Electricians Examining Board
shall inspect and certify in writing that the electrical system is safe and meets the National
Electrical code in effect at the time the home was manufactured.
§11 Sanitary Standards
A. Sewage Disposal
1.
All water carried sewage shall be disposed of by means of one of the following:
i. A centralized private sewer system approved by the State of Maine Department of
Human Services, serving each mobile home lot in the mobile home park.
ii. Individual subsurface sewage systems meeting the requirements of the State of Maine
Plumbing Code
2.
All subsurface sewage systems shall be located on soils approved by the local Plumbing
Inspector.
B. Refuse Disposal
The storage, collection and disposal of refuse in the mobile home park shall be so conducted
as to create no health hazards, rodent harborage, insect breeding areas, accident or fire
hazards, or air pollution.
§12 Fire Protection
A. If the mobile home park is to contain 20 living units or more and the park is not served by a
piped central or public water supply then the developer shall construct a pond or ponds with
suitable dry hydrant(s) within 1/2 mile of the proposed park to provide adequate water storage
for fire-fighting purposes. An easement shall be granted to the Town of Washington, Maine
granting access to and maintenance of the dry hydrant(s) where necessary. The Planning
Board may waive this requirement only upon submittal of evidence that there is an existing
pond with dry hydrant(s) within 1/2 mile of the proposed mobile home park or that the soil
types within 1/2 mile of the proposed mobile home park will not permit their construction.
The burden of proving this rests solely with the developer.
B. If the park is served by a piped central or public water supply then the developer shall install
fire hydrants within the park at the rate of one hydrant for every six units or less.
§13 Storm Drainage
A storm drainage plan shall be prepared by a professional engineer licensed by the State of Maine
showing ditching, culverts, storm drains, easements, and other proposed improvements sufficient to
accommodate a 25-year storm. Said storm drainage construction shall conform to the standards set
forth in Article XII, §5 of the Subdivision Ordinance.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 16 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
§14 Storage
At least 294 cubic feet (for example, a utility building measuring approximately 6' wide by 7' long
by 7' high or equivalent) of enclosed tenant storage facilities shall be conveniently provided on or
near each mobile home lot for the storage of materials and equipment.
§15 Utility Requirements
All mobile home parks shall provide permanent electrical, water and sewage disposal connections to
each mobile home in accordance with applicable state and local rules and regulations. State rules
and regulations shall take precedence over local rules and regulations in the event there is a conflict.
§16 Signs
Signs and advertising devices shall be prohibited in the mobile home park except:
A. One identifying sign at each entrance of the mobile home park no larger than 24 square feet
which may be indirectly lit, but not flashing.
B. Directional and informational signs for the convenience of tenants and the public relative to
parking, office, traffic movement, etc.
C. Mobile/manufactured home "for sale" signs, provided that such signs that face a public road
shall be no more than 10 square feet and shall be limited to two signs per mobile home park.
D. Mobile/manufactured home address signs.
The styles and location of the identifying sign shall not interfere with vehicle sight distance.
§17 Roof Loads
All homes to be located in the mobile home park with roofs added after manufacturing will require a
professional engineer licensed in the State of Maine to inspect the roof to determine that the roof
and home can withstand the extremes of the local weather and winds that may occur and certify
such in writing.
ARTICLE IX - ENFORCEMENT
§1 Construction Inspection
A. At least five days prior to completing each major phase of construction of required
improvements, the developer or builder shall:
1.
Notify the Code Enforcement Officer in writing of the time when it is proposed to
complete construction of the following phases of construction so that the Municipal
Officers can cause inspection to be made to assure that all municipal specifications and
requirements shall be met during the construction of required improvements, and to
assure the satisfactory completion of improvements and utilities required by the
Planning Board:
i. Roads and Walkways
ii. Septic and Drainage
iii. Utilities, Lighting and Signs
iv. Fire Pond and Open Space, if required
v. Unit Siting, Buffers, and Utility Building Siting
2.
Submit a fee in accordance with a fee schedule determined by the Board of Selectmen
[Amended from $100 per phase 30 March 2012] to pay for the costs of inspection per
phase as listed in Article IX, §1-A1, i through v, of this Ordinance, lawful currency of
the United States of America, with said notification. All checks, money orders or bank
drafts shall be made payable to the Town of Washington, Maine.
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 17 -
B. If the inspecting official finds upon inspection that any of the required improvements have not
been constructed in accordance with the plans and specifications filed for the mobile home
park, it shall be so reported in writing to the Selectmen, Planning Board, developer and owner
of the mobile home park. The Selectmen shall take any steps necessary to preserve the rights
of the Town of Washington, Maine.
C. If at any time before or during the construction of the required improvements it appears to be
necessary or desirable to modify the required improvements, the inspecting official is
authorized to approve minor modifications due to unforseen circumstances such as
encountering hidden outcrops of bedrock, natural springs, etc. The inspecting official shall
issue any approval under this article in writing and shall transmit a copy of the approval to the
Planning Board. Revised plans shall be filed with the Chairman of the Planning Board. For
major modifications, such as relocation of rights-of-way, property or lot boundaries, changes
of grade by more than 1%, etc., the developer or owner shall obtain permission in writing to
modify the plans from the Planning Board.
D. Upon completion of road construction, a written certification signed by a professional
engineer registered in the State of Maine shall be submitted to the Chairman of the Planning
Board at the expense of the applicant, certifying that the road(s) meet or exceed the design and
construction requirements of this Ordinance.
§2 Violations
A. No mobile home park plan shall be recorded in the Registry of Deeds until a Final Plan has
been approved and signed by the Planning Board in accordance with this Ordinance.
B. No person, corporation or other legal entity may sell or rent or offer to sell or rent any land in
a mobile home park which has not been approved by the Planning Board and recorded in the
Registry of Deeds.
C. No public utility, water district or sewer district shall serve any lot in a mobile home park for
which a final Plan has not been approved by the Planning Board and recorded in the Registry
of Deeds.
D. No development of the infrastructure of a mobile home park may begin until Final Plan
approval by the Planning Board and recording in the Registry of Deeds. Development
includes the grading and construction of roads, the grading of lots, utility installations, siting
of mobile homes, and construction of buildings.
§3 Park Plan Amendments After Approval
No changes, erasures, or modifications shall be made in a Final Plan after approval has been given
by the Planning Board unless the plan is first resubmitted and the Planning Board approves any
modifications. The applicant is not required to go through the complete review process of an
amendment to an existing mobile home park, unless, in the judgment of the Planing Board the
amendment substantially alters the character of the original mobile home park, or unless the change
constitutes a new mobile home park. If an amended Final Plan is recorded without complying with
this requirement, it shall be null and void. The Planning Board may institute proceedings to have the
plan stricken from the Registry of Deeds.
§4 Enforcement
The Code Enforcement Officer or the Selectmen of the Town of Washington, Maine, upon finding
that any provisions of this Ordinance or the conditions of any approval(s) is being violated, are
authorized to institute legal proceedings to enjoin violations of this Ordinance.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 18 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
§5 Penalties
Any person, firm or corporation being the owner or having control or use of any residential building
or infrastructure constructed or placed in violation of any of the provisions of this Ordinance shall
be fined in accordance with the penalty provisions of Title 30-A M.R.S.A. Section 4452.
ARTICLE X - PERFORMANCE GUARANTEES
§1 Applicability of Article X
The provisions of this article shall be in lieu of the Performance Guarantee requirements of the
Subdivision Ordinance.
§2 Types of Guarantees
With submittal of the application for Final Plan approval, the developer shall provide one of the
following performance guarantees for an amount adequate to cover the total construction costs of all
required improvements, taking into account the time-span of the construction schedule and the
inflation rate for construction costs:
A. Either a certified check payable to the Town or a savings account or certificate of deposit
naming the Town as owner, for the establishment of an escrow account; or
B. A performance bond payable to the Town issued by a surety company, approved by the
Selectmen; or
C. An irrevocable letter of credit from a financial institution establishing funding for the
construction of the mobile home park, from which the Town may draw if construction is
inadequate, approved by the Selectmen.
The conditions and amount of the performance guarantee shall be determined by the Board with the
advice of the Code Enforcement Officer, Road Commissioner, Selectmen, and/or Town Attorney.
§3 Contents of Guarantee
The performance guarantee shall contain a construction schedule, cost estimates for each major
phase of construction taking into account inflation, provisions for inspections of each phase of
construction, provisions for the release of part or all of the performance guarantee to the developer,
and a date after which the developer will be in default and the Town shall have access to the funds
to finish construction.
§4 Escrow Account
A cash contribution to the establishment of an escrow account shall be made by either a certified
check made out to the municipality, the direct deposit into a savings account, or the purchase of a
certificate of deposit. For any account opened by the developer, the municipality shall be named as
owner or co-owner, and the consent of the municipality shall be required for a withdrawal. Any
interest earned on the escrow account shall be returned to the developer unless the municipality has
found it necessary to draw on the account, in which case the interest earned shall be proportionately
divided between the amount returned to the developer and the amount withdrawn to complete the
required improvements.
§5 Performance Bond
A performance bond shall detail the conditions of the bond, the method for release of the bond or
portions of the bond to the developer, and the procedures for collection by the municipality. The
bond documents shall specifically reference the mobile home park for which approval is sought.
§6 Letter of Credit
An irrevocable letter of credit from a bank or other lending institution shall indicate that funds have
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 19 -
been set aside for the construction of the mobile home park and may not be used for any other
project or loan.
§7 Phasing of Development
The Board may approve plans to develop a mobile home park in separate and distinct phases. This
may be accomplished by limiting final approval to those lots abutting that section of the proposed
mobile home park street which is covered by a performance guarantee. When development is
phased, road construction shall commence from an existing public way. Final approval of lots in
subsequent phases shall be given only upon satisfactory completion of all requirements pertaining to
previous phases.
§8 Release of guarantee
Prior to the release of any part of the performance guarantee, the Board shall determine to its
satisfaction, in part upon the report of the inspecting official and whatever other agencies and
departments may be involved, that the proposed improvements meet or exceed the design and
construction requirements for that portion of the improvements for which the release is requested.
§9 Default
If, upon inspection, the inspecting official finds that any of the required improvements have not
been constructed in accordance with the plans and specifications filed as part of the application, he
shall so report in writing to the Code Enforcement Officer, the Municipal Officers, the Board, and
the developer or builder. The Municipal Officers shall take any steps necessary to preserve the
Town's rights.
§10 Improvements Guaranteed
Performance guarantees shall be tendered for all improvements required by this Ordinance, as well
as any other improvements required by the Board.
ARTICLE XI - DEFINITIONS
§1 Construction of Language
In general, all words and terms used in this Ordinance shall have their customary dictionary
meanings. More specifically, certain words and terms shall be described below.
§2 Relationship to Other Town Ordinances
Where there is a conflict between the language contained in this Ordinance and any other Town
ordinances, the stricter language shall apply for purposes of this Ordinance.
§3 Definitions
Board of Appeals: The Appeals Board of the Town of Washington, Maine as created by 30A,
M.R.S.A. 4353.
Body of Water: Shall include the following:
A. Pond or Lake - any inland impoundment, natural or manmade, which collects and stores
surface water.
B. Stream or River - a free flowing drainage outlet, with a defined channel lacking terrestrial
vegetation, and flowing water for more than three months during the year.
C. Tidal - any area upon which tidal action occurs.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 20 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
Code Enforcement Officer: A person appointed by the Selectmen of the Town of Washington, Maine
to administer and enforce this Ordinance. Reference to the Code Enforcement Officer may be
construed to include Building Inspector, Plumbing Inspector, Electrical Inspector, and the like,
where applicable.
Comprehensive Plan: Any part or element of the overall plan for development of the Town of
Washington, Maine as defined in Title 30-A, M.R.S.A. §4301 and as the same may be amended
from time to time.
Driveway: A private vehicular entrance from a road or right-of-way. The driveway itself shall not
constitute the means of legal access along which frontage may be measured.
Environmentally sensitive areas: Wetlands, swamps, dune areas, wildlife habitat areas, prime
agricultural areas, areas with steep slopes, areas with poorly drained soils if not on a public sewer,
and flood plain areas (subject to a 100 year flood).
Family: One or more persons occupying a premise and living as a single housekeeping unit.
Frontage: The linear distance between the sidelines of a lot, measured along the line that borders upon
whatever right-of-way serves as legal access to the lot. For the purposes of these regulations, the
following ways shall constitute legal access to a lot along which frontage may be measured:
A. A way accepted by or established as belonging to the Town of Washington, Maine, or the
State of Maine, provided access is not specifically prohibited.
B. A road way, whether dedicated to public ownership or not, as shown on an approved mobile
home park plan; this road way must have been constructed before consideration for lot access.
Hard surfaced: A covering for roads and walkways comprising any hard material such as packed
gravel, pea stone, asphalt, concrete, or paving blocks but not including sand, soil, clay, loam, or
wood.
Land Use Ordinance: The Town of Washington, Maine Land Use Ordinance as adopted 22 December
1988 by the Town and its subsequent amendments.
Lot Area: The total horizontal area within the lot lines.
Lot Coverage: The total horizontal area within the lot lines.
Lot Width: The distance between the side boundaries of the lot measured at the front setback line.
Manufactured Housing Unit: A structural unit or units designed for occupancy and constructed in a
manufacturing facility and transported, by the use of its own chassis or an independent chassis, to a
building site. The term includes any type of building which is constructed at a manufacturing
facility and transported to a building site where it is used for housing and may be purchased or sold
by a dealer in the interim. For the purposes of this section, two types of manufactured housing are
included. These two types are:
A. Those units constructed after June 15, 1976, commonly called "newer mobile homes," which
the manufacturer certifies are constructed in compliance with the United States Department of
Housing and Urban Development standards, meaning structures transportable in one or more
sections, which in the traveling mode are 14 body feet or more in width and are 750 or more
square feet, and which are built on a permanent chassis and designed to be used as dwellings,
T o w n o f W a s h i n g t o n , M a i n e
- 3/31/01 - Amended 3/30/12 - Town of Washington Mobile Home Park Ordinance - Pg. 21 -
with or without permanent foundations, when connected to the required utilities including the
plumbing, heating, air conditioning or electrical systems contained in the unit; this term also
includes any structure which meets all the requirements of this subparagraph, except the size
requirements and with respect to which the manufacturer voluntarily files a certification
required by the Secretary of the United States Department of Housing and Urban
Development and complies with the standards established under the National Manufactured
Housing Construction and Safety Standards Act of 1974, United States Code, Title 42, Section
5401, et seq.; and
B. Those units commonly called "modular homes," which the manufacturer certifies are
constructed in compliance with Title 10, Chapter 957, and rules adopted under that chapter,
meaning structures, transportable in one or more sections, which are not constructed on a
permanent chassis and are designed to be used as dwellings on foundations when connected to
the required utilities including the plumbing, heating, air conditioning or electrical systems
contained in the unit.
Mobile Home Park Lot: The area of land on which an individual home is situated within a mobile
home park and which is reserved for use by the occupants of that home. The Planning Board may
require a lot to be designated on a mobile home park plan.
Mobile Home Park: A parcel of land under unified ownership approved by the Planning Board
designed and/or used to accommodate three or more manufactured housing units.
Mobile Home Subdivision or Development: A parcel of land approved by the Planning Board
designed and/or used to accommodate three or more manufactured housing units on individually
owned lots.
M.R.S.A.: The abreviation for Maine Revised Statutes, Annotated, the definitive source for all state
statutes as published and updated by the State of Maine.
Normal High Water Mark of Inland Waters: That line of the shores and banks of nontidal water
which is apparent because of the different character of the soil or the vegetation due to the
prolonged action of the water. Relative to vegetation, it is that line where the vegetation changes
from predominantly aquatic to predominantly terrestrial (by way of illustration , aquatic vegetation
includes but is not limited to the following plant and plant groups: water lily, pond lily,
pickerilweed, cattail, wild rice, sedges, rushes, and marsh grasses, and terrestrial vegetation included
but is not limited to the following plants and plant groups, Upland grasses, aster, lady slipper,
wintergreen, partridgeberry, sarsparilla, pines, cedars, oaks, ash, alders, elms, and maples). In places
where the shore or bank is of such character that the high water mark shall be estimated from places
where it can be determined by the above method.
Planning Board: The Municipal Reviewing Authority of the Town of Washington, Maine as defined
by 30A M.R.S.A. Section 4301, Subsection 12.
Road: Public and private ways such as alleys, avenues, boulevards, highways, roads, streets, lanes and
other rights-of-way, as well as areas on mobile home park plans designated as rights-of-way.
Road Commissioner: The elected officer of the Town of Washington, Maine in charge of the roads of
said Town.
Selectmen: The primary elected officers of the Town of Washington, Maine.
T o w n o f W a s h i n g t o n , M a i n e
- Pg. 22 - Town of Washington Mobile Home Park Ordinance - 3/31/01 - Amended 3/30/12 -
Setback: The horizontal distance from a lot line to the nearest part of a structure.
Setback from Water: The horizontal distance from the normal high water mark to the nearest part of a
structure.
Subdivision Ordinance: The Town of Washington, Maine Subdivision Ordinance as adopted 1 April
1989 by the Town and its subsequent amendments.
§: A symbol used by legislating bodies or entities meaning "section."
Undue Hardship:
A. That the land in question cannot yield a reasonable return unless a variance is granted; and
B. That the need for a variance is due to the unique circumstances of the property and not to the
general conditions in the neighborhood; and
C. That the granting of a variance will not alter the essential character of the locality; and
D. That the hardship is not the result of action taken by the applicant or a prior owner.
Variance: A relaxation of the terms of an ordinance where such variance would not be contrary to the
public interest where, owing to conditions peculiar to the property and not the result of the action of
the applicant, a literal enforcement of this Ordinance would result in unnecessary and undue
hardship. A financial hardship shall not constitute grounds for granting a variance. The crucial
points of variance are undue hardship and unique circumstances applying to the property. A
variance is not justified unless all elements are present in the case.
ARTICLE XII - INDEX OF THIS ORDINANCE
§1 Index
Administration ...................................................................................Article III, §2 .....................1
Adoption of Amendment ...................................................................Article V, §2.......................2
Appeals and Variances.......................................................................Article VII, §4....................7
Applicability of Article VII ...............................................................Article VII, §1....................3
Applicability of Article X..................................................................Article X, §1.....................18
Applicability to this Ordinance..........................................................Article III, §4 .....................2
Application.........................................................................................Article VII, §2....................3
Application Procedures......................................................................Article VII, §3....................5
Authority............................................................................................Article III, §1 .....................1
Buffering............................................................................................Article VIII, §4...................9
Conflict with other Ordinances..........................................................Article IV, §2 .....................2
Construction Inspection .....................................................................Article IX, §1 ...................16
Construction of Language..................................................................Article XI, §1 ...................19
Contents .............................................................................................Article I, §1........................1
Contents of Guarantee........................................................................Article X, §3.....................18
Contour Interval and On-Site Inspection...........................................Article VI, §3 .....................3
Conversion.........................................................................................Article VIII, §8.................13
Default................................................................................................Article X, §9.....................19
Definitions..........................................................................................Article XI, §1 ...................19
T o w n o f W a s h i n g t o n , M a i n e
- 5/16/12 - Washington Proposed Mobile Home Park Ordinance - Pg. 23 -
Effective Date ....................................................................................Article III, §3 .....................1
Enforcement.......................................................................................Article IX, §4 ...................17
Escrow Account.................................................................................Article X, §4.....................18
Fire Protection....................................................................................Article VIII, §12...............15
General Requirements........................................................................Article VIII, §1...................8
Ground Water Impacts.......................................................................Article VIII, §7.................12
Improvements Guaranteed.................................................................Article X, §10...................19
Index ..................................................................................................Article XII, §1..................22
Initiation of Amendment....................................................................Article V, §1.......................2
Letter of Credit...................................................................................Article X, §6.....................18
Lot Area, Lot Width and Lot Coverage Requirements......................Article VIII, §2...................8
Open Space Reservation ....................................................................Article VIII, §5.................10
Park Plan Amendments After Approval ............................................Article IX, §3 ...................17
Penalties.............................................................................................Article IX, §5 ...................18
Performance Bond .............................................................................Article X, §5.....................18
Phasing of Development....................................................................Article X, §7.....................19
Preapplication Procedure ...................................................................Article VI, §1 .....................2
Preapplication Submission.................................................................Article VI, §2 .....................3
Preservation of Natural and Historic Features...................................Article VIII, §9.................13
Purpose...............................................................................................Article II, §2.......................1
Relationship to Other Town Ordinances............................................Article XI, §2 ...................19
Release of guarantee ..........................................................................Article X, §8.....................19
Rights not Vested...............................................................................Article VI, §4 .....................3
Road Design, Circulation, Traffic Impacts and Parking....................Article VIII, §6.................10
Roof Loads.........................................................................................Article VIII, §17...............16
Safety Standards.................................................................................Article VIII, §10...............13
Sanitary Standards .............................................................................Article VIII, §11...............15
Severability ........................................................................................Article IV, §1 .....................2
Signs...................................................................................................Article VIII, §16...............16
Storage ...............................................................................................Article VIII, §14...............16
Storm Drainage..................................................................................Article VIII, §13...............15
Title....................................................................................................Article II, §1.......................1
Types of Guarantees ..........................................................................Article X, §2.....................18
Unit Setback Requirements................................................................Article VIII, §3...................9
Utility Requirements..........................................................................Article VIII, §15...............16
Violations...........................................................................................Article IX, §2 ...................17