TOWN OF WATERBORO
Subdivision Ordinance
Adopted August 9, 1972
Amended June 23, 1988
Amended March 11, 1989
Amended July 18, 1989
Amended April 26, 2003
Amended January 17, 2012
Amended May 13, 2016
Amended January 28, 2020
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
TABLE OF CONTENTS
ARTICLE I AUTHORITY .............................................................................................................. 1
ARTICLE II ENFORCEMENT ...................................................................................................... 1
ARTICLE III PURPOSE AND GUIDELINES ............................................................................... 1
ARTICLE IV DEFINITIONS ......................................................................................................... 4
ARTICLE V PREAPPLICATION .................................................................................................. 5
ARTICLE VI PRELIMINARY PLAN.......................................................................6
ARTICLE VII FINAL PLAN ........................................................................................................ 10
ARTICLE VIII GENERAL REQUIREMENTS ........................................................................... 13
ARTICLE IX DESIGN STANDARDS ......................................................................................... 15
ARTICLE X PERFORMANCE GUARANTEE ........................................................................... 19
ARTICLE XI WAIVERS .............................................................................................................. 21
ARTICLE XII APPEALS .............................................................................................................. 21
ARTICLE XIII SEPARABILITY AND EFFECTIVE DATE ...................................................... 21
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
1
ARTICLE I AUTHORITY
Under statutory power and authority granted to Boards in accordance with 30 M.R.S.A., Chapter 454, §
4401, the Waterboro Planning Board, hereinafter called the Board, in an official meeting convened on
August 9, 1972, adopted Land Subdivision Regulations of the Board of the Town of Waterboro, Maine.
This Ordinance has subsequently been amended pursuant to 30-A M.R.S.A., § 4401 et seq.
ARTICLE II ENFORCEMENT
No person, firm, corporation, or other legal entity may sell, lease, or convey for consideration, offer or agree
to sell, lease or convey for consideration any land in a subdivision which has not been approved by the Board
or other reviewing authority of Waterboro and recorded by the Register of Deeds of York County in Alfred.
No subdivision plan or plat shall be recorded by the said Register which is not been approved as required.
Approval for the purpose of recording shall appear in writing on the plat or plan. No public utility, water
district, sanitary district, or any utility company of any kind shall install service to any lot in a subdivision for
which a plan has not been approved.
Any person, firm, corporation, or other legal entity who sells, leases, or conveys for consideration, offers,
or agrees to sell, lease, or convey for consideration any land in a subdivision which has not been approved
as required by this regulation shall be in violation of this Ordinance and may be subject to enforcement
pursuant to 30-A M.R.S.A., § 4452.
ARTICLE III PURPOSE AND GUIDELINES
To exert a beneficial influence upon the use of land areas, water and other natural resources of Waterboro in
such a manner as to safeguard the health, safety and welfare for which community services, when required,
can be most economically installed and efficiently utilized, thereby presenting the image of a town which has
a forward-looking government responsive to expansion, but only consistent with the above ideals and realistic
and reasonable concern for the environment.
To this end, when reviewing and approving subdivisions in the Town of Waterboro, Maine, the Board will
consider the following criteria and, before granting approval, will determine that the proposed
subdivision:
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
2
A.
Will not result in undue water or air pollution. In making this determination it will at least
consider: The elevation of the land above sea level and its relation to the flood plains; the
nature of soils and subsoils and their ability to adequately support waste disposal; the slope of
the land and its effect upon effluents; and the applicable State and local health and water
resource regulations.
B.
Has sufficient water available for the reasonably foreseeable needs of the subdivision.
C.
Will not cause an unreasonable burden on an existing water supply, if one is to be utilized.
D. Will not cause unreasonable soil erosion or reduction in the capacity of the land to hold
water so that a dangerous or unhealthy condition may result.
E.
Will not cause unreasonable highway or public road congestion or unsafe conditions with
respect to use of the highways or public roads, existing or proposed. For those subdivisions
that require driveways or entrances onto a state or state aid highway located outside of the
urban compact area, the Maine Department of Transportation has provided documentations
indicating that the driveways or entrances conform to 23 M.R.S.A., § 704, and any rules
adopted under that statute.
F.
Will provide for adequate sewage waste disposal and will not cause an unreasonable burden on
municipal services if they are to be utilized.
G. Will not cause an unreasonable burden on the ability of the Town to dispose of solid waste, if
municipal services are to be utilized.
H. Will not have an undue adverse effect upon the scenic or natural beauty of the area, aesthetics,
historical sites, significant wildlife habitat identified by the Department of Inland Fisheries
and Wildlife or the municipality, or rare and irreplaceable natural areas or any public rights
for physical or visual access to the shoreline.
I.
Is in conformance with a duly adopted subdivision regulation or ordinance,
comprehensive plan, development plan, or land use plan, if any. In making this
determination, the Board may interpret these ordinances and plans.
J.
The Applicant has adequate financial and technical capacity to meet the standards and
requirements of this Ordinance.
K. Whenever situated, in whole or in part, within the watershed of any pond or lake or within
250 feet of any wetland, great pond or river as defined in 38 M.R.S.A., Chapter 3, Subchapter
I, Article 2-B, the subdivision will not adversely affect the water quality or undesirably affect
the shoreline of such body of water.
1. When lots in a subdivision have frontage on an outstanding river segment, the proposed
subdivision plan must require principal structures to have a combined lot shore frontage
and setback from the normal high-water mark of 500 feet, which is consistent with the
Saco River Corridor Commission.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
3
a. To avoid circumventing the intent of this provision, whenever a proposed subdivision
adjoins a shoreland strip narrower than 250 feet which is not lotted, the proposed
subdivision shall be reviewed as if lot lines extended to the shore.
b. The frontage and setback provisions of this paragraph do not apply either within areas
zoned as general development or its equivalent under the Town's shoreland zoning,
adopted pursuant to 38 M.R.S.A., Chapter 3, Subchapter I, Article 2-B, or within areas
designated by ordinance as densely developed. The determination of which areas are
densely developed must be based on a finding that existing development met the
definitional requirements of 30-A M.R.S.A., § 4401, Subsection 1, on September 23,
1983.
L. Will not result in an unreasonable burden upon school facilities.
M. Will not, alone or in conjunction with existing activities, adversely affect the quality or
quantity of groundwater.
N. Based on the Federal Emergency Management Agency's Flood Boundary and Floodway Maps
and Flood Insurance Rate Maps, and information presented by the Applicant whether the
subdivision is in a flood-prone area. If the subdivision, or any part of it, is in such an area, the
Applicant shall determine the 100-year flood elevation and flood hazard boundaries within the
subdivision. The proposed subdivision plan must include a condition of plan approval
requiring that principal structures in the subdivision will be constructed with their lowest
floor, including the basement, at least one foot above the 100-year flood elevation.
O. All freshwater wetlands within the proposed subdivision have been identified on any maps
submitted as part of the application, regardless of the size of these wetlands. Any mapping
of freshwater wetlands may be done with the help of the local soil and water conservation
district.
P. All farmland within the proposed subdivision has been identified on maps submitted as part
of the application. Any mapping of farmland may be done with the help of the local soil and
water conservation district.
Q. If any lots in the proposed subdivision have shore frontage on a river, stream, brook, great
pond, or coastal wetland as these features are defined in 38 M.R.S.A., § 480-B, none of the
lots created within the subdivision have a lot depth to shore frontage ratio greater than 5 to
1.
R. The long-term cumulative effects of the proposed subdivision will not unreasonably
increase a great pond's phosphorus concentration during the construction phase and life of
the proposed subdivision.
S.
For any proposed subdivision that crosses municipal boundaries, the proposed subdivision
will not cause unreasonable traffic congestion or unsafe conditions with respect to the use of
existing public ways in an adjoining municipality in which part of the subdivision is
located.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
4
T. Timber on the parcel being subdivided has not been harvested in violation of rules adopted
pursuant to 12 M.R.S.A., § 8869, §§14. If a violation of rules adopted by the Maine Forest
Service to substantially eliminate liquidation harvesting has occurred, the Board must
determine prior to granting approval for the subdivision that 5 years have elapsed from the
date the landowner under whose ownership the harvest occurred acquired the parcel. The
Board may request technical assistance from the Maine Department of Agriculture,
Conservation and Forestry, and Bureau of Forestry, to determine whether a rule violation
has occurred, or the Board may accept a determination certified by a forester licensed
pursuant to 32 M.R.S.A., Chapter 76. If the Board requests technical assistance from the
Bureau, the Bureau shall respond within 15 (fifteen) working days regarding its ability to
provide assistance. If the Bureau agrees to provide assistance, it shall make a finding and
determination as to whether a rule violation has occurred. The Bureau shall provide a
written copy of its finding and determination to the Board within 30 days of receipt of the
Board's request. If the Bureau notifies the Board that the Bureau will not provide
assistance, the Board may require a subdivision Applicant to provide a determination
certified by a licensed forester.
For the purposes of this subsection, "liquidation harvesting" has the same meaning as in,
12 M.R.S.A., §8868, §§ 6 and "parcel" means a contiguous area within one municipality,
township, or plantation owned by one person or a group of persons in common or joint
ownership. This subsection takes effect on the effective date of rules adopted pursuant to
12 M.R.S.A., § 8869, §§ 14.
ARTICLE IV DEFINITIONS
A. Abutter: One whose property is within 500' to the perimeter of the tract developed or proposed
for development.
B.
Comprehensive Plan: Any part or element of the overall plan for the development of the Town as
defined in 30-A M.R.S.A. § 4301.
C.
Construction Drawings: Drawings showing the location, profile, grades, size, and type of
drains, sewers, water mains, underground fire alarm ducts, underground power ducts and
underground telephone ducts or cables, pavement, street cross sections, and miscellaneous
structures etc.
D. Easement: The recorded authorization of a property owner for the use, by another, for a specified
purpose, of any designated part of his property.
E.
Final Subdivision Plan: The final drawings, on which the Applicant's plan of subdivision is
presented to the Board for approval and which, if approved, may be filed for recording with the
York County Register of Deeds.
F.
Groundwater: The water beneath the surface of the ground: the source of water in springs and
wells.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
5
G. Legislative Body: Board of Selectmen.
H. Official Submittal Date: The date of submission of a Preliminary Subdivision Plan or a Final
Subdivision Plan shall be the date of the meeting at which time the application is found complete
by the Planning Board.
I. Person: Any firm, individual, association, organization, partnership, trust, company, or corporation.
J.
Board: The Planning Board of the Town of Waterboro, Maine, created under 30-A M.R.S.A.,
§§4401-4408; or 30 M.R.S.A., Chapter 201-A, § 1917.
K. Preliminary Subdivision Plan: The preliminary formal drawings of the subdivision to be
submitted to the Board for its review and consideration.
L.
Sketch Plan: An informal plat of the proposed subdivision indicating approximate lot boundaries,
street location, community wells, and sewage disposal areas (if any) and entrances to existing
roads.
M. Street: Includes alleys, avenues, boulevards, highways, roads, streets, and any other pedestrian or
vehicular right-of-ways.
N. Subdivision: See 30-A M.R.S.A., § 4401.
O. Tract or Parcel: A tract or parcel of land is defined as all contiguous land in the same ownership,
except that lands located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on both sides
of the road after September 22, 1971.
ARTICLE V PREAPPLICATION
5.1 PROCEDURE
5.1.1 An Applicant shall schedule an appointment with the Planning Board staff to submit a sketch
plan. Sketch Plan applications shall be submitted at least 14 days prior to the Applicants'
meeting with the Board. The Board will not take any formal action on the plan at that
meeting. The intent of the meeting is to introduce the proposed subdivision and discuss with
the Applicant any potential issues that the board may want to address during the Preliminary
and Final review stages. A sketch plan meeting is not considered a substantive review under
the provisions of 1 M.R.S.A., § 302.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
6
5.1.2 At the time of the pre-application inspection the Applicant shall submit for informal
discussion a sketch plan relative to the proposed subdivision, which may be of assistance to
the Board in making its determination. The Sketch Plan shall be drawn to a scale of not over
200 ft. to one inch showing the proposed layout of the lots, streets, drainage, reserved land
for community or public use, ledge outcroppings, historical preserves, trees of unusual size
or interest, etc., including the acreage range of lots.
At the Sketch Plan stage it will be determined by the Board whether the project will be
developed as a conventional subdivision or a cluster development. All cluster
development designs are subject to the performance standards set forth in Section 8 of
the Waterboro Zoning Ordinance.
ARTICLE VI PRELIMINARY PLAN
6.1 PROCEDURE
The Board will not accept a Preliminary Plan for review until the pre-application (sketch)
procedure has been completed.
6.1.1 Within 6 months of meeting with the Board with a sketch plan, the Applicant shall submit
the Preliminary Plan for consideration and recommendations. Failure to do so shall require
resubmission of the Sketch Plan. The Preliminary Plan shall conform to the layout shown
on the Sketch Plan plus any recommendations made by the Board at the time of the
discussion of the Sketch Plan.
6.1.2 The Applicant or his/her duly authorized representative shall, at least 14 days prior to his/her
scheduled meeting before the Board, submit a preliminary plan application. The Applicant or
the Applicant's duly authorized representative shall attend his/her scheduled meeting of the
Board to discuss the Preliminary Plan. If the Preliminary Plan Application is not submitted 14
days prior to the Applicant's meeting, the Board will not take action on the plan at that
meeting. The Applicant will have to schedule another meeting. The Board shall take up to 30
days to find the application complete. At the time of submission, the Applicant shall notify all
abutters and any other entities that may require notification and certify in writing as part of the
application that this has been completed.
6.1.3 Within sixty (60) days after formal submission of a completed Preliminary Plan Application,
the Board shall take action to give preliminary approval, with or without modification
required, or the grounds for disapproval shall be stated in the minutes of the Board and
conveyed to the Applicant in writing. Prior to approval of the Preliminary Plan, the Board
may hold a public hearing.
6.1.4 When granting preliminary approval to a preliminary plan, the Board shall state the
conditions of such approval, if any, with respect to:
1. The specific changes which are required in the Final Plan.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
7
2. The standards for which waivers have been requested and which the Board determines may be
waived without jeopardy to the intent and purposes of this ordinance. See Article XI for waiver
requirements and the application form for waiver request sheets.
6.1.5 Approval of a preliminary plan shall not constitute approval of the Final Plan, but rather, it shall
be deemed an expression of approval of the design submitted on the Preliminary Plan as a guide
to the preparation of the Final Plan. The Final Plan shall be submitted for approval by the Board
and for recording upon fulfillment of the requirements of these regulations and the conditions of
the preliminary approval, if any.
6.1.6 Within seven (7) days after submitting the Preliminary Plan, the Applicant shall notify, by
certified mail, all property owners within five hundred (500) feet of the perimeter of the
proposed development. The Applicant shall, at the same time, send a copy of the notice and list
of those notified to the Board for verification of abutter notification. A copy of the standard
notification letter will be provided to all Applicants with application materials.
6.1.7 When professional services are required to evaluate a proposal, design or assessment, the
expense of these reviews shall be borne by the Applicant. The cost shall be paid to the Town of
Waterboro prior to the release of the signed subdivision plat.
6.2 PRELIMINARY PLAN
6.2.1 The Preliminary Plan shall be submitted in fifteen (15) copies of one or more maps or drawings
which may be printed or reproduced on size 24 inch by 36 inch paper with all dimensions shown
in feet or decimals of a foot, drawn to a scale of 1 inch equals not more than sixty (60) feet, and
showing or accompanied by the following information:
1. The proposed subdivision name or identifying title, the name of the town and state, the date,
the graphic scale, and the true North arrow displayed in a conspicuous place.
2. Name and address of the owner of record, Applicant, soil scientist, designer and/or engineer
and land surveyor.
3. Number of acres within the proposed subdivision, location of property lines, existing
easements, buildings, watercourses and other essential existing physical features.
4. The names of all subdivisions immediately adjacent and the names of owners of record of
other adjacent parcels, not subdivided, including those subdivisions and parcels directly
across abutting streets, streams and right-of-ways.
5. The provisions of the Zoning Ordinance applicable to the area to be subdivided and any
zoning district boundaries affecting the proposed subdivision.
6. The location and size of any proposed or existing, water mains, culverts or drains, and
existing wetlands, brooks, perpetual springs and natural drainage ditches.
7. Locations, names, and present widths of existing and proposed streets, highways, easements,
building lines, alleys, parks and other public open spaces.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
8
8. The width and location of any streets or other public ways or places shown upon the Official
Map and the Comprehensive Plan, if any, within the area to be subdivided, and the width,
location, grades, and street profiles of all streets or other public ways proposed by the
Applicant.
9. Contour lines at such intervals as the Board may require. A log of on-site soil
investigations by a registered soil scientist, made in accordance with the requirements of
the State Plumbing Code, for two (2) test pits per lot separated by a minimum of 50 feet,
the location of which to be clearly delineated on both the Preliminary and Final Plans
also indicating the 100 foot separation between the test pit locations and any proposed
well locations..
10. Deed description of and plan of perimeter survey of tract to be developed, made and
certified by a registered land surveyor and tied to established permanent reference points,
reference to lot number or numbers as shown on the Town Tax Maps, also book and page
in and on which the deed for the tract is recorded.
11. Connection with existing public or private community water supply.
12. Connection with existing public or private community sanitary sewerage system.
13. Provisions for collecting and discharging storm drainage, in the form of a drainage plan
and calculations.
14. Preliminary designs of any bridges and size of which are proposed, showing their
location.
15. Proposed lot lines with approximate dimensions, lot numbers or names, approximate lot
acreage, and suggested location of buildings. Each lot shall also have E911 addressing
approved by the town's addressing officer, along with any proposed street names
approved by the towns review agent in charge.
16. Location of temporary boundary markers conspicuous enough to enable the Board to
readily locate and envision, while in the field,
17. All parcels of land proposed to be dedicated to public or community use and with a
statement of the conditions of such dedication.
18. Proposed use of any part of the original tract which is not to be included in the
subdivision.
19. The location of all natural features or site elements to be preserved.
20. A soil erosion and sediment control plan.
21. A statement relative to the schedule of construction.
22. A statement relative to the amenities or services and future responsibilities therefore.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
9
24. A hydrogeological analysis
When requested or required by the Board the Applicant shall provide an analysis as outlined
below. The Applicant may request a waiver consistent with Article XI if the Applicant can
demonstrate that a waiver is justified upon review and approval by the board.
A hydrogeologic impact study prepared by a State of Maine licensed geologist or a licensed
professional engineer with experience in hydrogeology shall be provided for all subdivisions
utilizing on-site septic disposal systems. This study shall contain, at a minimum, the following
components:
A. 1. A high intensity soil survey in accordance with the current standards set by the
Maine Association of Professional Soil Scientists. The map shall include
documentation of the different drainage classifications.
2. Groundwater levels and flow rates through the site and the aquifer, if one is
determined to exist, should be determined.
a. Monitoring wells should be installed, using an acknowledged procedure, to
insure proper date collection.
b. The number of monitoring wells could vary, depending upon size and
geology, but a minimum of three, laid out in a plan triangle would be needed
to provide the necessary data to triangulate the levels and flows.
c.
Ground water levels shall be surveyed to a common datum on site.
d. Groundwater flow rates should be calculated by using groundwater gradients
and soil permeability.
e.
Monitoring wells should remain in place and in a useable condition for
continued use into the future. The Applicant should provide means to insure
the protection of these wells.
1. An analysis of surface drainage conditions and their relationship to offsite
conditions.
2. Data on existing groundwater quality for the site should be provided.
Collection of this data can either be provided by monitoring wells within
the proposed subdivision or by existing wells on abutting properties,
provided that the data collected from those wells would represent the
groundwater on the site to be used for drinking water.
3. A calculation of average nitrate nitrogen levels on-site after development
and calculation of nitrate nitrogen levels at the down gradient property
line(s). These calculations should be done under normal rainfall and
draught conditions.
4. The sites recommended for the individual subsurface waste water
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
10
disposal systems and the drinking water wells in the subdivision should
be placed on the subdivision plan.
B. No development shall increase nitrate nitrogen concentrations at the property
line of the development in excess of (5mg/L).
C. On site drinking water wells shall be located in areas where it has been
determined that the nitrate nitrogen concentrations are at or below (5mg/L).
D. If groundwater contains contaminants in excess of the primary drinking water
standards, and the subdivision is to be served by on-site groundwater supplies, the
Applicant shall demonstrate how water quality will be improved or treated and the
Applicant shall make a note on the plan and deed that the situation exists.
E.
Subsurface waste water disposal systems and drinking water wells shall be constructed
in the locations shown on the map submitted with the assessment. If construction
standards for drinking water wells and subsurface waste water disposal systems are
recommended in the assessment those standards shall be included as a note on the final
plan, and as restrictions in the deeds for the effected lots.
6.2.2 Land covered by proposed subdivision shall be so marked in the field that the Board may
readily observe locations of proposed roads and lot comers while making its on-site inspection.
ARTICLE VII FINAL PLAN
7.1 PROCEDURE
7.1.1 The Applicant shall, within ninety (90) days after the approval of the Preliminary Plan, file
with the Board an application and fee for approval of the Final Subdivision Plan in the form
described herein. If the Final Plan is not submitted to the Board within this time the Board
may, without prejudice, refuse to act upon it for an additional ninety days. The Applicant
shall, at least 14 days prior to his/her scheduled meeting before the Board, submit a
completed final plan. If the Final Plan application is not submitted in 14 days prior to the
Applicants meeting the Board shall not take action on the Final Plan at that meeting.
7.1.2 The time of submission of the Final Plan shall be as defined in Article IV, "Definitions".
7.1.3 A Public Hearing on the Final Plan will be held by the Board, if requested or if the Board
deems it desirable. Such a hearing will get the normal posting and advertisement with all
fees being paid by the Applicant. The Applicant shall comply with the performance and
maintenance guarantee requirements set forth in Article X of this Ordinance. The Board
shall, within sixty (60) days of the submission of the Final Plan, or within thirty (30) days
after a public hearing, except as stated in 7.1.1, approve, approve with conditions or deny
the application. The reasons for any conditions required or the grounds for denial shall be
stated upon the Findings of Fact of the Board's review and transmitted to the Applicant in
writing.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
11
7.2 SUBMISSIONS
The Final Plan shall be drawn on one 24" x 36" 20-lb white bond paper for recording and shall be
submitted along with ten (10) regular copies of it. Space shall be provided thereon for endorsement by
all appropriate agencies and shall include:
1. All of the information presented on the Preliminary Plan and location map and any
amendments thereto suggested, required, or agreed to by the Board.
2. The name, registration number, and seal of the land surveyor, architect, engineer, planning
consultant, and soil scientist involved in its conception.
3. Street names and lines, pedestrian ways, lots, easements and areas to be reserved for or
dedicated to public or community use and the submission of local and/or state highway
entrance permits if any are required.
4. Sufficient data acceptable to the Board to determine readily the location, bearing, and length
of every street line, lot line, boundary line, and to reproduce such lines upon the ground.
Where practical, these should be tied to reference points previously established.
5. The length of all straight lines, the deflection angles of all curves, tangent distances, and
tangent bearings for each street.
6. By proper designation, all public and/or community open space for which offers of cessionary
made by the Applicant and those spaces to which title is reserved by the Applicant.
7.
Lots within the subdivision numbered in accordance with local practice.
1. Permanent reference monuments shall be shown as: "X". They shall be constructed in
accordance with specifications prescribed herein and their location noted and
referenced upon the Final Plan.
2. The Applicant shall receive written approval from the E911 coordinator of any
proposed road names prior to final plan approval and show the road name(s) on the
final plan. The Applicant shall mark on the plan, lines or dots in the center of the
streets at every fifty (50) foot interval so as to aid in the assignment of numbers to
structures subsequently constructed and all other requirements set forth in conformance
with the Enhanced 9-1-1 Ordinance.
3. Wherever any residence or other structure is developed, it shall be the duty of the lot
owner to procure the assigned number from the E911 coordinator. This shall be done at
the time of issuance of the building permit.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
12
7.3 FINAL APPROVAL AND FILING
7.3.1 Upon approval by the Board, a notation to that effect upon the plan and the affixing of the
signatures of a majority of the Board members on the Final Plan shall be deemed to have
final approval, subject to any conditions that the Board required as part of the approval. One
of the ten (10) submitted plans shall be transmitted to the Board of Selectmen for the Town
records and the others retained by the Board and the Planning Department. After the
required performance guarantee has been posted, the original signed plan shall be returned to
the Applicant who shall, within ninety (90) days after the date of approval, file it in the York
County Registry of Deeds. Failure to record within the specified ninety (90) days from the
date of approval shall cause the approval to expire and to become null and void unless the
Applicant can demonstrate, to the satisfaction of the Board that the delay was due to causes
beyond the Applicant's control, in which case the Board may grant extension or extensions
of time not to exceed, in total, one hundred twenty (120) days. Any request for an extension
must be received by the Town prior to the end of the 90-day period.
At the time the Board grants the Final Plan approval, the Board may approve a phasing
plan for the development in order to insure the orderly development of the project.
7.4 PLAN REVISIONS AFTER APPROVAL
7.4.1
No changes, erasures, modifications, or revisions shall be made in any final plan after Board
approval has been endorsed upon the plan. If an Applicant wishes to alter the approved plan
he shall submit a revised plan consisting of the entire subdivision, or, if the plan consists of
more than one sheet, that entire sheet on which the alterations is proposed. If any lots have
been sold or are under sales contract, in either case, the new submission shall show it is a
"Revision of the Plan Approved on (date)" and shall provide space for the usual Board
approval. The procedure for the Final Plan approval, excluding the fee, will then be
followed. No revised plan shall be recorded until it has been approved by the Board.
7.5 MUNICIPAL ACCEPTANCE OF STREETS AND OTHER LAND AREAS
7.5.1 The approval by the Board of the subdivision plan shall not be deemed to constitute or be
evidence of any acceptance by the Town of any street, easement, park, playground,
recreation area, or other open space area shown on such plan and the Final Plan shall bear a
statement to this effect.
7.5.2 Referring to the above mentioned land areas, excluding streets, the Board or the Board of
Selectmen may require the filing of a written agreement between the Applicant and the
Board of Selectmen covering future deed and title, dedication, and provision for the cost of
grading, development, equipment, and maintenance of any such recreation area.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
13
ARTICLE VIII GENERAL REQUIREMENTS
In reviewing applications for the subdivision of land, the Board shall consider the following
general requirements. In all instances the burden of proof of satisfactory performance shall be
upon the Applicant.
8.1 PROVISION FOR PROPOSED PUBLIC SITES AND OPEN SPACES
8.1.1 Depending upon the size and location of the subdivision, the Board may require the
Applicant to provide up to ten (10) percent or not less than 10,000 sq. ft. of the total area for
recreation. Such area shall be in one parcel and reasonably accessible from all lots within the
subdivision.
8.1.2 Land reserved for park and/or recreational purposes shall be of a character, configuration and
location suitable for the particular use intended. Any area to be used for active recreation
purposes such as a playground or athletic field should be acceptable level and dry, have no
outcropping of ledge or boulders, have a total frontage on one or more streets of at least 200
ft., and have no major dimension of less than 200 ft. Areas reserved for passive recreational
uses shall have such access as the Board may deem suitable. The area, configuration and
orientation of the site may be determined by the Board based upon its natural and scenic
aspects and topographical characteristics.
8.2 NON BUILDABLE LAND
8.2.1 The Board shall not approve any proposed subdivision that:
1. Are commonly recognized as "wetlands", which must be filled or drained, or land created
by diverting recognized brooks, streams, or rivers unless the Applicant can obtain all
required state and federal permits for such activities.
2. Is obtained by filling or draining any portion of any body of water.
8.3 LOTS
8.3.1 Minimum lot sizes shall conform to the applicable requirements of the Zoning Ordinance.
8.4 DRAINAGE EASEMENTS
8.4.1 Where a subdivision is traversed by a natural water course, drainage way, channel, or stream,
there shall be provided a drainage easement. Such easement(s) will be reviewed individually
for width needs and considered during the review process by the Board and Director of Public
Works to determine if the easement is of an adequate width.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
14
8.5 UTILITIES
8.5.1 The size, type and location of such public utilities as street lights, electric, telephone, gas
lines, and fire hydrants etc. shall be approved by the Board and installed in accordance with
applicable codes and specifications.
8.6 REQUIRED IMPROVEMENTS AND INSPECTION
8.6.1 The following, where applicable, shall be required improvements: monuments, street signs,
streets, sidewalks, water supply lines, sewage lines, and storm drainage culverts, except
where the Board may waive the provisions of these regulations.
8.6.2 At least ten (10) days prior to the start of construction of required improvements the Applicant
shall notify the CEO in writing of the time when he/she proposes to commence construction
of such improvements so that the CEO can cause inspection to be made to ensure that all
municipal specifications and requirements will be met during the construction of required
improvements, and to ensure the satisfactory completion of improvements required by the
Board.
8.6.3 If the municipal code enforcement officer shall find, upon inspection of the improvements
performed before expiration date of the performance bond, that any of the required
improvements have not been constructed in accordance with plans and specifications filed by
the Applicant, or that conditions imposed by the Board have not been met, the CEO shall then
notify the Applicant and, if necessary, the bonding company, and take all necessary steps to
preserve the Town's rights under the bond. No plan by the Applicant shall be approved by the
Board as long as the Applicant is in default on a previously approved plan.
8.6.4 If unforeseen conditions make it necessary or preferable to modify the location or design of
such required improvements, the CEO, may upon approval of the Board, authorize
modifications provided they are within the spirit and intent of the Board's approval. The CEO,
under this section shall transmit a copy of such authorization to the Board at its next regular
meeting.
8.6.5 The Applicant shall be required to maintain all streets, culverts and drainage ditches and
provide for snow removal and sanding on streets until acceptance of said improvements by
the Board of Selectmen.
8.7 FIRE PROTECTION
1. The Board shall require fire protection for all developments and the Applicant shall provide
written verification from the fire chief that their proposal meets his approval. The following
forms of fire protection shall be allowed based on the circumstances surrounding the location of
the development:
a. Sprinkler system installed in each residential unit;
b. Hook up to town water system and provide a hydrant every 800-1,000 feet.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
15
8.8 GREEN BELTS
8.8.1 For the purpose of these regulations, a "greenbelt" is defined as a strip of land vegetated with
grass or other plant life maintained as open green space and located along the existing public
road abutting the proposed development. Removal of dead trees, mowing of grass, and
pruning of other vegetation, to the extent appropriate for routine maintenance, are the only
cutting permitted within a greenbelt area. The only construction permitted within a greenbelt
is that necessarily related to the use of a utility easement and/or that necessarily related to a
driveway.
8.8.2 If the proposed subdivision abuts Routes 5, 202, or 4, any state-aid road or any town road, a
strip of land (greenbelt) not less than twenty-five (25) feet and not more than one hundred
(100) feet in width adjacent to said highway and running along said road may be required to
be set aside as a greenbelt, and the Applicant shall submit provisions for maintaining this
area consistent with Section 8.8.1 above. Said green belt shall be shown on the Preliminary
and Final Plans. The Applicant may request a waiver of this requirement to the Board as part
of the review process if the Applicant can demonstrate that this provision is not necessary for
future street widening.
ARTICLE IX DESIGN STANDARDS
9.1 MONUMENTS
9.1.1 Permanent monuments shall be set at all corners and angle points of the subdivision
boundaries, at corners of each lot, and also at all street intersections and points of curvature.
These monuments must be set prior to the acceptance of any street by the Board of Selectmen.
9.1.2 Monuments shall be stone, metal, or concrete located in the ground at final grade level and
indicated on the Final Plan. After they are set, if stone or concrete, drilled holes 1/2 inch deep
shall locate the point or points described above.
9.2 STREET SIGNS
9.2.1 Streets which join or are in alignment with streets of abutting or neighboring properties shall
bear the same name. Names of new streets shall not duplicate nor bear phonetic resemblance
to the names of existing streets within the municipality and shall be subject to the approval
of the Code Enforcement Officer.
9.2.2 Street name signs shall be furnished and installed by the Applicant. The type, size, and
location shall be designed to meet the Manual of Uniform Traffic Control Devices (MUTCD).
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
16
9.3 STREETS
9.3.1
Proposed streets shall conform to the standards found in the Street Design and
Construction Standards Ordinance unless a waiver of the street standard design has been
granted by the Board.
9.3.2
In the case of dead-end streets, where needed or desirable, the Board may require the
reservation of a fifty (50) foot wide easement in the line of the street or in any practical
direction to provide for continuation of utilities or access of pedestrian traffic to the next
street.
9.3.3
Construction of streets, sidewalks, bridges, culverts, and surface drainage systems shall
conform to applicable standards and specifications of this section.
9.3.4
Grades of all streets shall conform, in general to the terrain, and shall not be less than
one half (1/2) of one (1) percent nor more than ten (10) percent in residential areas, but,
in no case, more than three (3) percent within fifty (50) feet of any intersection.
9.3.5
Intersections of streets shall be at angles as close to ninety (90) degrees as possible
and in no case shall two streets intersect at an angle smaller than sixty (60) degrees.
To this end where one street approaches another between 60-90degrees, the former
street should be curved approaching the intersection.
9.3.6
A dead-end street, or cul-de-sac, shall not exceed fifteen hundred feet (1500) feet in
length and shall have a turnaround at the closed end in which the radius of the traveled
way shall not be less than 60 feet.
9.3.7
All streets shall be provided with adequate drainage facilities, having year-round
effectiveness, that will provide for the removal of stormwater thereby preventing
flooding of the pavement and surrounding property and these facilities shall be so
constructed as to prevent erosion of the drainage-ways.
9.3.8
The reserved right-of-way for all residential streets shall be not less than fifty (50) feet in
width and the paved surface shall be not less than twenty-four (24) feet; the centerlines of
the right-of-way and the paved surface shall coincide.
9.3.9
Side slopes of filled roadbeds shall not be steeper than one (1) vertical foot in every
three (3) horizontal feet (1 to 3 or 33 and 113 percent). They shall be smoothly graded,
loamed and seeded by the Applicant with "Soil Conservation Mix" and a viable and
effective growth produced which will prevent erosion.
9.3.10
All required monumentation must be set and a written statement to this fact must be
submitted by a land surveyor to the CEO prior to the issuance of any building permits
on an approved subdivision.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
17
9.4 CUTTING AND PLANTING
9.4.1
Trees, natural undergrowth, topsoil, gravel, or other soil deposits in their natural state at
the time of the pre-application inspection by the Board shall be considered a part of the
subdivision and, except for the removal or rearrangement required for building
construction, landscaping, parking lots, recreations areas and streets or for the removal of
diseased and hazardous trees, shall not be removed except in accordance with specific
agreement with the Board.
9.4.2
Cutting Restrictions: On slopes exceeding 25 percent, no cutting will be permitted.
The Board or its representative may grant such relief from this restriction as it deems
reasonable or necessary. This restriction shall be placed in the deeds as a covenant and
shall be perpetual, (applicable to subdivisions with slopes of over 10%).
9.4.3
It shall be the responsibility of the Applicant, in all landscaped areas created by filling or
redistribution of available soil, to ensure that the earth is properly compacted, fertilized,
seeded and a viable and effective growth produced thereon that will prevent erosion or
slippage, or both, for a period of two (2) years after construction. The Board may grant a
waiver of these standards if justification can be made that strict adherence to the standards is
not warranted.
9.5 STORM WATER MANAGEMENT DESIGN STANDARDS
9.5.1
Adequate provision shall be made for disposal of all storm water generated within the
subdivision, and any drained ground water through a management system of swales, culverts,
underdrains, and storm drains. The storm water management system shall be designed to
convey storm water flows to existing watercourses or storm drains.
A.
Where a subdivision is traversed by a stream, river, or surface water drainage way, or
where the Board feels that surface water run-off to be created by the subdivision
should be controlled, there shall be easements or drainage swales, culverts, catch
basins or other means of channeling surface water within the subdivision and over
other properties. This stormwater management system shall be designed by a registered
professional engineer.
B. Drainage easements for existing watercourses or proposed drainage ways shall be
provided at least thirty feet wide, conforming substantially with the lines of existing
natural drainage.
C. All components of the storm water management system shall be designed to limit peak
discharge to predevelopment levels for every storm between the 2-year, 10-year, and
25 year storm, Type III storm frequencies, based on rainfall data for Portland, Maine.
When the subdivision discharges directly to a major water body as defined in the
Zoning Ordinance, peak discharge may be increased from predevelopment levels
provided downstream drainage structures are suitably sized based on the most recent
data from an acceptable design methodology.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
18
D. The Board may require nutrient removal structures where maintaining water
quality in downstream waters is deemed important.
E. The Board, under advisement of a registered professional engineer or other
qualified professional, shall have the authority to waive detention requirements
where benefits to the public are minimal. This shall be determined on a case-by
case basis.
9.5.2
The Board may require nutrient removal structures where maintaining water quality in
downstream waters is deemed important. The storm water management system shall be
designed to accommodate upstream drainage. Nutrient removal analysis shall be
considered when doing a subdivision in the direct watersheds of a water body Most at
Risk in Waterboro as defined by the Maine Department of Environmental Protection
Nonpoint Source Priority Watersheds List.
9.5.3
Downstream drainage requirements shall be studied to determine the effect of the
proposed subdivision. The stormwater shall not overload existing or future planned storm
drainage designs. The Board, under advisement of a registered professional engineer or
other qualified professional, shall recommend to the board if the waiver of the design
standards is justified where an acceptable alternative is demonstrated.
9.5.4
Catch basins shall be installed where necessary or required and should be located at the
curb line or the invert of a ditch as required.
9.5.5
Outlets shall be stabilized against soil erosion by stone riprap or other suitable
materials to reduce storm water velocity. Wherever type storm drainage system is not
within the right-of-way of a public street, perpetual easements shall be provided to the
Town allowing maintenance and improvement of the system.
9.5.6
The plan shall indicate who will be responsible for maintenance of detention or other
drainage structures and elements and nutrient removal structures.
9.6 CERTIFICATION OF CONSTRUCTION
9.6.1
Certification of Construction. "As built" plans shall be submitted to the Planning
Department for the Road Review Committee. Upon completion of street construction and
prior to consideration by the Board of Selectmen of acceptance of a street, a written
certification signed by a professional engineer registered in the State of Maine shall be
submitted to the Board of Selectmen, prepared at the expense of the Applicant, certifying
that the proposed way meets the design and construction requirements of these
regulations and the Street Design and Construction Standards Ordinance for the Town of
Waterboro.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
19
ARTICLE X PERFORMANCE GUARANTEE
10.1 Types of Guarantees
Prior to the release of the approved subdivision plan, the Applicant shall provide one of
the following performance guarantees for an amount adequate to cover the total
construction costs of all required improvements, taking into account the time-span of the
construction schedule and the inflation rate for construction costs. The Applicant shall
deposit with the Town Escrow Agent or Planning Office an amount equal to 125% of the
estimated costs of construction, including but not limited to the construction of streets,
sidewalks, drainage, detention ponds, recreation areas, playgrounds, sewer lines, water
lines, or other utility or use requiring underground construction. This fee is to be paid by
the Applicant to the Town of Waterboro upon final approval of the subdivision. Any
remaining funds will be refunded to the Applicant at the completion of the project.
10.1.1 Forms of a Performance Guarantee may include:
A. Either a certified check payable to the municipality or a savings account or
certificate of deposit naming the Town as owner, for the establishment of an
escrow account;
B. A performance bond payable to the municipality issued by a licensed
surety company, approved by the municipal officers, or town
administrator;
C. An irrevocable letter of credit from a licensed financial institution establishing
funding for the construction of the subdivision, from which the municipality may
draw if construction is inadequate, approved by the municipal officers, or town
administrator;
The conditions and amount of the performance guarantee shall be determined by the
Board with the advice of the municipal engineer, Director of Public Works, municipal
officers, and/or municipal attorney.
10.1.2 Contents of Guarantee
The performance guarantee shall contain a construction schedule, cost estimates for each
major phase of construction taking into account inflation, provisions for inspections of
each phase of construction, provisions for the release of part or all of the performance
guarantee to the Applicant, and a date after which the Applicant will be in default and
the municipality shall have access to the funds to secure and stabilize any safety
concerns from the defaulted project.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
20
10.1.3 Escrow Account
A cash contribution to the establishment of an escrow account shall be made by either a
certified check made out to the municipality, the direct deposit into a savings account,
or the purchase of a certificate of deposit. For any account opened by the Applicant, the
municipality shall be named as owner or co-owner, and the consent of the municipality
shall be required for a withdrawal by a co-owner, but the municipality shall be able to
withdraw funds without the consent of the co-owner.
10.1.4 Performance Bond
A performance bond shall detail the conditions of the bond, the method for release of
the bond or portions of the bond to the Applicant, and the procedures for the payment of
claims by the municipality. The bond documents shall specifically reference the
subdivision for which approval is sought. The bond shall run to the Town; a
contractor's bond will not be accepted as a performance bond under this Ordinance.
10.1.5 Letter of Credit
An irrevocable letter of credit from a licensed bank or other licensed lending institution
shall indicate that funds have been set aside for the construction of the subdivision and
may not be used for any other project or loan.
10.1.6 Phasing of Development
The Board may approve plans to develop a major subdivision in separate and distinct
phases. This may be accomplished by limiting final approval to those lots abutting that
section of the proposed subdivision street which is covered by a performance guarantee.
When development is phased, road construction shall commence from an existing public
way. Final approval of lots in subsequent phases shall be given only upon satisfactory
completion of all requirements pertaining to previous phases.
10.1.7 Release of Guarantee
Prior to the release of any part of the performance guarantee, the Town Administrator
shall determine to its satisfaction, based upon the report of the municipal engineer or
other qualified individual retained by the municipality and any other agencies and
departments who may be involved, that the proposed improvements meet or exceed the
design and construction requirements for that portion or phase of the subdivision for
which the release is requested.
10.1.8 Default
If upon inspection the municipal engineer or other qualified individual retained by the
municipality finds that any of the required improvements have not been constructed in
accordance with the plans and specifications filed as part of the application, he or she
shall so report in writing to the code enforcement officer, the municipal officers, the
Board, and the Applicant or builder. The municipal officers shall take any steps
necessary to preserve the municipality's rights.
01/29/2020 Final Version Approved by Vote of the Selectman on 01/28/2020
21
10.1.9 Improvements Guaranteed
Performance guarantees shall be tendered for all improvements required to meet the
standards of these regulations for the construction of the following but not limited to; the
streets, storm water management facilities, public sewage collection or disposal
facilities, public water systems, erosion and sedimentation control measures, and street
lighting.
ARTICLE XI WAIVERS
11.1 Where the Board finds that strict compliance with these Regulations due to unusual conditions
existing in any particular proposed subdivision, it may give justifiable relief by granting waiver
to regulations provided, however, such actions will not have the effect of defeating the intent of
these regulations or any Official Map, Comprehensive Plan or Zoning Ordinance which may
exist.
11.2
Where the Board determines that, due to certain conditions existent in a proposed subdivision,
the provision of certain required improvements is not requisite in the public interest, or is
inappropriate because of inadequacy or lack of prerequisite facilities in the proximity of the
proposed subdivision, it may waive such requirements, subject to appropriate conditions as will,
in its judgment, secure substantially the objectives of the requirements so varied or modified.
ARTICLE XII APPEALS
12.1
An appeal from a decision of the Board may be taken to the Zoning Board of Appeals.
ARTICLE XIII SEPARABILITY AND EFFECTIVE DATE
13.1
The invalidity of any provision of this ordinance shall not invalidate any other part.
13.2
This ordinance shall take effect immediately upon adoption by the Waterboro Board of
Selectmen.