This is the exact embedded text of the captured official document.
Snapshot b44331d5b0db · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
TOWN OF
WATERBORO
Price$8.00
ZONING ORDINANCE
·:::::::. :·::::. .
-,
--~·::::. : .::::::::.~·:::: ·· --
:
:
:
:
:
-----~~
~
/.~---<&
~
-
Enacted March 12; 1977
Amended through December 4, 2024
Enacted March 12, 1977
Amendment Dates
Amended through March 8, 1986
Amended through March 12, 1988
Amended through May 10, 1988
Amended through March 11, 1989
Amended through March 10, 1990
Amended through September 25, 1990
Amended through March 9, 1991
Amended through June 5, 1993
Amended through June 4, 1994
Amended through June 3, 1995
Amended through June 3, 1996
Amended through November 12, 1996
Amended through March 8, 1997
Amended through March 11, 2000
Amended through June 24, 2000
Amended through April 27, 2002
Amended through April 26, 2003
Amended through May 13, 2004
Amended through September 4, 2007
Amended through August 23, 2011
Amended through July 22, 2014
Amended through April 28, 2015
Amended through May 13, 2016
Amended through June 24, 2016
Amended through December 22, 2016
Entire Ordinance Amended through March 29, 2018
Amended through October 5, 2021
Amended through June 6, 2023
Amended through December 19, 2023
Amended through December 4, 2024
Table of Contents
Article 1 Introduction ............................................................................................. 1
Section 1.01 Statutory Authority .............................................................................................. 1
Section 1.02 Purpose .................................................................................................................. 1
Section 1.03 Intent ..................................................................................................................... 1
Section 1.04 Underlying Assumptions and Premises ................................................................ 1
Section 1.05 Abrogation and Greater Restrictions .................................................................... 2
Section 1.06 Interpretation ......................................................................................................... 2
Section 1.07 Severability ........................................................................................................... 2
Section 1.08 Amendment. .......................................................................................................... 2
Section 1.09 Effective Date ....................................................................................................... 5
Section 1.10 Reserved ................................................................................................................ 5
Article 2 General Provisions ................................................................................... 7
Section 2.01 Jurisdiction ............................................................................................................ 7
Section 2.02 Actions Requiring Compliance ............................................................................. 7
Section 2.03 Building, Occupancy and Change of Use Permits Required ................................ 7
Section 2.04 Duties of Code Enforcement Officer .................................................................... 8
Section 2.05 Site Restrictions ..................................................................................................... 8
Section 2.06 Use Restrictions .................................................................................................... 9
Section 2.07 Size Reductions or Increases ................................................................................. 9
Section 2.08 Applications ......................................................................................................... 10
Section 2.09 Site Plan Review ................................................................................................. 10
Section 2.10 Site Plan Review Standards ................................................................................ 13
Section 2.11 Administration .................................................................................................... 14
Article 3 Zoning Districts .................................................................................... 18
Section 3.01 General ................................................................................................................ 18
Section 3.02 Zoning Map ......................................................................................................... 18
Section 3.03 Summary of Dimensional Regulations Contained in Article 3 ........................... 19
Section 3.04 Village District (V) ............................................................................................. 20
Section 3.05 Residential District (R) ........................................................................................ 22
Section 3.06 Agriculture and Residential District (AR) .......................................................... 23
Section 3.07 Forest and Agriculture District (FA) ................................................................... 25
Section 3.08 Conservation District (C) .................................................................................... 26
Section 3.09 Village/Residential District (VR) (Amended 03/11/2000) ................................ 26
Section 3.10 General Purpose Zone (GP) ................................................................................ 27
Section 3 .11 Reserved .............................................................................................................. 28
Article 4 Special Use Standards ........................................................................... 30
Section 4.01 Special Requirements for Extraction Operation Approval ................................. 30
Section 4.02 Mobile Classroom Regulations ........................................................................... 31
Section 4.03 Mobile Home Park .............................................................................................. 31
Section 4.04 Campground Developments ............................................................................... 32
Section 4.05 Home Occupations .............................................................................................. 33
Section 4.06 Wheelchair Ramp Which Does Not Meet Town Setback Requirements ............ 34
Section 4.07 Wellhead Protection District WHPD .................................................................. 34
Section 4.08 Adult Businesses ................................................................................................. 48
Section 4.09 Special Requirements for Apartment Conversions ............................................. 49
Section 4.10 Special Requirements for Office/Office Complex .............................................. 49
Section 4.11 Modifications for Special Structures .................................................................. 51
Section 4.12 Commercial Design Standards ............................................................................ 51
Section 4.13 Mobile Vending .................................................................................................. 52
Section 4.14 Alternate Energy Sources ................................................................................... 53
Section 4.15 Accessory Dwelling Unit ............ ................................... ............. ..... 57
Section 4.16 Affordable Housing Developments & Density Allowances .. .... ............... .... 57
Article 5 Traffic, Parking, Road Access ............................................................. 59
Section 5.01 Traffic Visibility and Screening .......................................................................... 59
Section 5.02 Loading Area Requirements ............................................................................... 59
Section 5.03 Parking Area Requirements ................................................................................ 59
Section 5.04 Roadway Access ................................................................................................. 63
Section 5.05 Reserved .............................................................................................................. 63
Article 6 Signs ......................................................................................................................... 64
Section 6.01 General Requirements ......................................................................................... 64
Section 6.02 Signs Not Requiring a Permit ............................................................................. 64
Section 6.03 Signs Requiring a Permit .................................................................................... 65
Section 6.04 Reserved .............................................................................................................. 66
Article 7 Planned Unit Development and Cluster Development ..................... 69
Section 7.01 Planned Unit Development.. ............................................................................... 69
Section 7.02 Cluster Development .......................................................................................... 70
Section 7.03 Reserved ............................................................................................................... 71
Article 8 N onconformance ................................................................................... 72
Section 8.01 Existing Nonconforming Uses and Structures .................................................... 73
Section 8.02 Existing Uses and Structures Which Conform With This Ordinance ................ 73
Section 8.03 Replacement and Maintenance ........................................................................... 73
Section 8.04 Abolishment and Transfer .................................................................................. 74
Section 8.05 Existing Nonconforming Lots and Pending Applications for Building Permits 74
Section 8.06 Nuisance .............................................................................................................. 74
Section 8.07 Reserved .............................................................................................................. 74
Article 9 Zoning Board of Appeals ...................................................................... 77
Section 9.01 Establishment ...................................................................................................... 77
Section 9.02 Membership and Organization ............................................................................ 77
Section 9.03 Procedure ............................................................................................................ 77
Section 9 .04 Duties .................................................................................................................. 78
Section 9.05 Hearing and Parties ............................................................................................. 79
Section 9.06 Findings .............................................................................................................. 80
Section 9.07 Decisions ..... .......... ... .. ........ ...... ............ ... ..... ... ..... ... .... .... ........ .. 77
Section 9.08 Judicial Review ................................................................................................... 80
Section 9.09 Reserved .............................................................................................................. 81
Article 10 Planning Board ................................................................................... 83
Section 10.01 General .............................................................................................................. 83
Sectionl0.02 Hearings ............................................................................................................. 84
Section 10.03 Findings and Decisions ..................................................................................... 84
Section 10.04 Review .............................................................................................................. 84
Section 10.05 Reserved ............................................................................................................ 85
Article 11 Violations, Enforcement .................................................................... 88
Section 11.01 Violations, Fines ............................................................................................... 88
Section 11.02 Board of Selectmen Orders, Enforcement ........................................................ 88
Section 11.03 Performance Guarantee: Value, Requirements and Conditions ....................... 88
Section 11.04 Release of obligation required by performance guarantee ............................... 89
Section 11.05 Extension of performance guarantee period ..................................................... 89
Section 11.06 Record Management and Performance Guarantee Facilitation ........................ 90
Section 11.07 Reserved ............................................................................................................ 91
ARTICLE 12 Definitions ..................................................................................... 92
Section 12.01 General .............................................................................................................. 92
Section 12.02 Words and Terms Defined ................................................................................ 92
Section 12.03 Reserved .......................................................................................................... 104
Article 1 Introduction
Section 1.01 Statutory Authority
This ordinance in enacted pursuant to the authority granted in 30-A M.R.S.A. §4352 and the Home
Rule powers granted in Article VIII-A of the Maine Constitution implemented by legislation
contained in 30-A, M.R.S.A. §4352. Therefore, the citizens of Waterboro do enact and ordain as
follows: (Amended 05/16/2016)
Section 1.02 Purpose
The purpose of this ordinance is to promote the health, safety, prosperity, aesthetics, and general
welfare of the Town of Waterboro. This ordinance does not pertain to any other codes adopted by
the Town. See the Town's list of all codes administered by the Town.
Section 1.03 Intent
It is the intent of this ordinance to regulate and restrict the use of all lands, waters, and structures;
regulate and restrict lot coverage, population distribution and density, and the size and locations of
all structures so as to: lessen congestion on and promote the safety and efficiency of streets and
highways; secure safety from fire, flooding, and other dangers; provide adequate light, air, water
supply, sanitation, drainage, and access to roads and waterbodies; avoid undue population
concentrations; facilitate the adequate provision at reasonable costs of public facilities and utilities;
stabilize and protect existing public and private property and the value inherent therein; insure the
appropriate use of land and the conservation of natural resources; preserve and promote the historic
character and beauty of the town. It is further intended to provide for the administration and
enforcement of this ordinance and to provide penalties for its violation.
Section 1.04 Underlying Assumptions and Premises
Existing natural phenomena within the Town of Waterboro, the geographic size of Waterboro, the
present and foreseeable population of Waterboro, and the actions of governmental agencies outside
of Waterboro give rise to a series of conditions, assumptions, and premises upon which this
ordinance is predicated. They include: existing major roads and highways, which are largely
funded and maintained by state highway departments, major extensions, resurfacing, or widening;
public sewage collection and storm water drainage systems, which do not now exist, but may in the
future. Higher density residential and mixed use districts must have proximity to essential public
facilities and both public and private services (schools, roads, police and fire protection, utilities,
shops); districts which permit only lower density development either lack this necessary proximity
or have other physical limitations involving soils, slope, drainage, suitability for subsurface waste
water disposal etc.
1
Section 1.05 Abrogation and Greater Restrictions
It is not the intent of this ordinance to abrogate, repeal, annul, impair or interfere with any existing
easements, covenants, deed restrictions or agreements; or with state statutes, rules, regulations, or
permits; or with other local ordinances or regulations. However, in all of the above situations where
this ordinance imposes greater restrictions, the provisions of this ordinance shall govern.
Section 1.06 Interpretation
a. Interpretations of words, phrases, or specific provisions of this ordinance leading to the
granting or denial of a necessary permit, the approval or disapproval of any proposal, or any
other action or refusal to act by the Code Enforcement Officer or the Planning Board may be
appealed to the Zoning Board of Appeals within thirty (30) days of the decision by an
applicant or aggrieved party, or by any of the elected or appointed municipal officials or
employees listed above.
b. In judicial proceedings arising out of this ordinance and its application by the Town of
Waterboro, it is the intent of the Town that the provisions of this ordinance be regarded as
minimum requirements and that they be liberally construed in favor of the town so that the
purposes and intentions (see Sections 1.06 and 1.07) of the ordinance may be achieved.
c. All persons interpreting words, phrases, or provisions of this ordinance shall be bound by
the definitions set out in Articlel2. Those words or terms that are not defined in Article 12
shall be defined by the normal and usual meanings of words and phrases in everyday speech
and by the meaning to be drawn from the context in which a particular word, phrase, or
provision is set. All interpretations must be in harmony with and seek to achieve the overall
purpose and intent of the ordinance.
Section 1.07 Severability
If any section, clause, provision or portion of this ordinance is adjudged unconstitutional or invalid
by a court of competent jurisdiction, the remainder of this ordinance shall not be affected thereby.
Section 1.08 Amendment
a. Pursuant to the same authority by which this ordinance is enacted (see section 1.01) the
regulations, restrictions, and boundaries established by this ordinance may be changed,
supplemented, or repealed. A proposal for such action shall be referred to as a proposed
amendment. A proposed amendment under this subsection may be offered by any person
who owns land in Waterboro, any resident of the town, the Code Enforcement Officer, the
Planning Board, or the Selectmen.
1. All proposed amendments shall be presented initially to the Selectmen who shall
forward them to the Planning Board which shall within thirty (30) days hold a public
hearing meeting pursuant to the statutory requirements of notification. Once that has
been completed, the Planning Board will review the proposal and forward a
2
recommendation and the Planning Board's reasoning respecting the proposed
amendment to the Selectmen. The Selectmen shall within thirty (30) days of initial
receipt of a proposed amendment schedule a public hearing thereon giving at least
seven (7) days general notice by publication of the date, time and place of such hearing
and the complete text of the proposed amendment.
2. At hearings held on a proposed amendment to this Ordinance, all persons present must
be given a full opportunity to be heard. The authors of the proposed amendment
should explain and present the rationale of their proposal at the outset. The review,
recommendation, and comments of the Planning Board, the Town Attorney, and the
Selectmen should then be presented. A question and answer period, if necessary,
should follow. The comments of any other members of the public should then be
received.
3. After a public hearing the Board of Selectmen shall vote on the proposed amendment.
The decision to make any amendment to the Zoning Ordinance, including conditional
or contract rezoning, shall be wholly within the discretion of the Selectmen who may,
at their option,_decline, amend or adopt said proposal. Any amendment approved
hereunder shall become effective as set forth in the Town Charter.
b. Pursuant to 30-A, M.R.S.A. § 4352(8), conditional or contract zoning is hereby authorized
for development where, for reasons such as the unusual nature or unique location of the
development proposed, the Board of Selectmen finds it necessary or appropriate to impose,
by agreement with the property owner or otherwise, certain conditions or restrictions not
generally applicable to other properties similarly zoned; it should not be used to circumvent
enforcement decisions of the Code Enforcement Officer or decisions of the Zoning Board of
Appeals. All contract or conditional zoning under this section shall establish rezoned areas
which are compatible with the existing and permitted uses within the original zones.
Nothing in this section shall authorize a rezoning, or an agreement to change or retain a
zone, which is inconsistent with the Town's Comprehensive Plan. A conditional or contract
rezoning may be requested by the owner of the property for which the rezoning is sought or
by someone who has a legal interest in the property.
All conditions and restrictions imposed shall relate only to the physical development and/or
operation of the property and may include, by way of example:
a. Limitations on the number and types of uses permitted.
b. Restrictions on the scale and density of the development.
c. Specifications for the design and layout of the buildings, structures, and other
improvements.
d. Schedules for commencement and completion of construction, including anticipated
schedules (i.e. beginning and completion dates) for all construction phases.
e. Performance guarantees securing completion and/or maintenance of public and private
improvements and guarantees against defects.
3
f. Preservation and enhancement of open spaces and buffers, and protection of natural areas
and historic sites, including establishment of park land and conservation easements.
g. Contributions toward the provisions of municipal services required by the development.
h. Construction or enhancement of certain public capital improvements impacted by the
development.
1. Provisions for enforcement and remedies for breach of any condition or restriction.
J. Provisions regulating the assignability of said contract, including fees relating to the
same.
A person wishing to propose contract zoning under this Section shall, prior to filing an
application, submit a conceptual sketch plan and contract proposal to the Board of Selectmen.
The sketch plan review fee is non-refundable.
Any proposal to amend the Official Zoning Map of the Town through the establishment of a
conditional or contract rezoning shall be reviewed by the Board of Selectmen and passed on to
the Planning Board for a thorough review and public hearing and comment back to the Board of
Selectmen with recommendations on the application should proceed. Such contract shall
include, at a minimum, the proposed conditions of the rezoning, enforcement provisions and a
map of the area for which the rezoning is requested shall be considered.
To help recover costs incurred by the Town in the review, administration, site inspection, and
public notice associated with the conditional or contract rezoning application, the following fees
and deposit in such amount(s) and for such purpose(s) as the Board of Selectmen shall establish
by way of Planning Board recommendation includes:
(a) Publishing and public notice fee.
(b) Review fee.
( c) Independent consulting and peer review escrow account.
(d) Reimbursement of fees for professional services incurred by the Town for advice
and negotiations relating to said conditional or contract rezoning.
The Planning Board shall conduct a public hearing prior to any property being rezoned under
this Section. Notice of this hearing shall be posted in the Town Clerk's office at least thirteen
(13) days prior to each public hearing and shall be published in a newspaper of general
circulation within the Town at least two (2) times, the date of the first publication to be at least
seven (7) days prior to the hearing.
Notice shall also be sent to the owner or owners of the property to be rezoned and to the owners
of all property abutting the property. This notice shall contain a copy of the proposed conditions
and restrictions, with a map indicating the property to be rezoned.
4
At the end of the public hearing, the Planning Board shall vote whether to recommend the
conditional or contract rezoning application to the Board of Selectmen. The vote of the
Planning Board shall be forwarded to the Board of Selectmen for consideration with the
application for conditional or contract rezoning.
No conditional or contract rezoning shall exempt the applicant from subsequent Site Plan review
and/or Subdivision review by the Planning Board of the proposed development.
(Amended
04/2 l /2007)
Section 1.09 Effective Date
This ordinance shall be in full force and have legal effect in the Town of Waterboro as of March
13, 1977. Amendments shall be in full force and have legal effect in the town as by the Board of
Selectmen in accordance with the provisions of the Town Charter.
Section 1.10 Reserved
5
6
Article 2 General Provisions
Section 2.01 Jurisdiction
The jurisdiction of this ordinance shall include all lands and water within the corporate limits of the
Town of Waterboro as shown on the official zoning map (see Section 3.02 of this ordinance) which
is on file in the Town Clerk's office.
Section 2.02 Actions Requiring Compliance
The use of land, water, or structures and the location, erection, movement, reconstruction,
extension, enlargement, conversion, or structural alteration of structures or parts thereof shall
hereafter be in conformance with the provisions of this ordinance.
Section 2.03 Building, Occupancy and Change of Use Permits Required
(Amended 06/4/1994)
A building permit, designed to insure compliance with state law, this ordinance, other local land use
ordinances or regulations, and conditions (if any) attached to an approved project, must be obtained
from the Code Enforcement Officer prior to constructing, locating, erecting, moving,
reconstructing, extending, enlarging, converting, or structurally altering any permanent or
temporary structure or use. A building permit shall be granted or denied by the Code Enforcement
Officer as promptly as possible, but no more than 10 working days from the time the application is
found complete. A building permit shall expire one ( 1) year from the date of its issue unless
substantial work (actual construction) has commenced. Work commenced must be completed
within two (2) years. A building permit shall not be valid for a longer period of time but may be
renewed for an additional two (2) years if the nature of the project has been continuous.
Prior to the construction or installation of any building or structure, the property owner or contractor
shaH provide to the Code Enforcement Office a certification from a land surveyor demonstrating
that the placement of the foundation meets the required setbacks. For purposes of this provision, a
foundation shall be defined as any base material that provides frost protection for habitable space
located above it.
An occupancy/use permit must be obtained from the Code Enforcement Officer prior to actually
using or occupying a permanent or temporary structure upon which work contemplated in a
building permit has been completed. An occupancy permit shall be granted or denied as promptly
as possible after a physical inspection of the structure and project site by the Code Enforcement
Officer but no more than 3 days after the final satisfactory inspection has been completed.
The Code Enforcement Officer shall be notified of any change in use of building or premises, and a
permit shall be secured for such change. (Amended 06/24/1994)
Permits may also be subject to other codes or ordinances adopted by the Town.
7
Section 2.04 Duties of Code Enforcement Officer
The Code Enforcement Officer shall receive and process all applications for building and
occupancy permits. When and if necessary, the Code Enforcement Officer shall refer the applicant
to the Zoning Board of Appeals, the Planning Board or the Selectmen of the Town of Waterboro for
such review, approval, and action by these bodies as state statute and this ordinance require.
Applications for required permits shall be deemed complete only after required reviews, approvals
and actions by the above bodies are completed.
When the provisions of state law, this ordinance, other local land use ordinances and regulations,
and conditions (if any) attached to an approved project are met, the Code Enforcement Officer shall
issue the required permits within the time deadlines specified (see Section 2.03) When such
provisions are not met, he/she shall deny issuance of the required permits. A denial of either a
building or occupancy permit must include a statement of reasons for the denial. A building or
occupancy permit issued in conflict with the provisions of state law, this ordinance, other local land
use ordinance or regulations, or conditions (if any) attached to an approved project is null and void.
Decisions of the Code Enforcement Officer with respect to the granting or denial of a building
permit or occupancy permit may be appealed to the Zoning Board of Appeals of the Town of
Waterboro within thirty (30) days of the decision by the applicant or by an aggrieved party, as set
forth in Section 9.08(Amended 03/8/1986, 04/26/2003)
The Code Enforcement Officer may, on his/her own, and shall upon complaint, investigate to
insure that state law, this ordinance, other local land use ordinances or regulations, or conditions (if
any) attached to an approved project are not being violated. Upon finding a violation of any statute,
ordinance, regulation, or condition outlined above, the Code Enforcement Officer shall notify the
violator of such fact and simultaneously issue a code enforcement order to the violator requiring
immediate compliance with the particular provisions of law involved. The failure to comply with a
code enforcement order will subject the violator to penalties, further orders, and possible legal
action as outlined in Sectionsl 1.02 andl 1.03.
The Code Enforcement Officer may seek entrance to any property or structure within the Town of
Waterboro to inspect and carry out the provisions of this ordinance. His/her testimony and records
shall be available to the Town Attorney to facilitate law enforcement and the prosecution of
individuals who violate a code enforcement order.
Section 2.05 Site Restrictions
All lots shall abut upon an existing or proposed road which meets all municipal and other
applicable governmental regulations and standards or, if landlocked, shall have a legally recorded
access right-of-way, of no less than fifty (50) feet in width, to a public or private road. All lots,
with the exception of landlocked lots, shall have a minimum road and/or water frontage of one
hundred (100) feet in the Village zone, one hundred (100) feet in the Village/Residential zone
except on cul-de-sacs where fifty (50) feet will be required, one hundred fifty (150) feet in the
Residential and the Agriculture/Residential and General Purpose zones and two hundred (200) feet
in the Forest/Agriculture and Conservation zones. Situations involving or utilizing cul-de-sacs,
curvilinear streets, cluster design or planned unit design permitted by the Subdivision Regulations
or this Ordinance (see Sections 7.0land 7.02) when the Planning Board determines that these
8
frontage requirements are not practical, - may allow the Planning Board to approve frontage
reductions of up to fifty (50) percent. (Amended 03/11/1989, 3/11/00 and 04/26/2003)
With the exception of multi-unit housing, clustered or planned unit developments, an individual lot
shall have only one principal structure and accompanying accessory structures upon it.
Section 2.06 Use Restrictions
In each zoning district, the only uses permitted are those specified as primary uses or conditional
uses and relevant accessory uses and structures, the non-commercial keeping of animals, and similar
undertakings incidental to a primary or conditional use. In addition, all conditional uses in any
zoning district and their accessory uses and structures are subject to Planning Board review and
approval (See Article 2 section 2.09).
Temporary uses may be permitted in any zoning district for brief periods of time not to exceed
thirty (30) days with the approval of the Code Enforcement Officer. The approval of a temporary
use may be appropriately conditioned to avoid harm to adjacent property owners and the public. A
temporary use may not be extended for more than two (2) additional thirty (30) day periods and
then only if the applicant for such use can show need and that undue hardship will result if the
temporary use is not extended.
Section 2.07 Size Reductions or Increases
(Amended 03/12/1988, 03/11/1989, 09/25/1990, 11/12/1996, 03/11/2000, 05/13/2016)
If an existing lot of record does not comply with the minimum lot size requirements of the zone in
which it is located the following shall apply to all setbacks:
1. Yard Setbacks
a. Rear: There shall be behind every building a rear setback having a minimum depth
established by the zone in which the property is located as found in Section 3.03 or 25
percent of the average depth of the lot, whichever is less.
b. Side: There shall be a minimum side yard setback established by the zone in which the
property is located between any building and the side property line or the side yard
setback shall be ten feet and increased one foot for every five feet or part thereof
increase in the street frontage over 50 feet to a maximum side yard setback as found in
Section 3.03 for the zone in which the property is located.
c. Front: There shall be in front of every building a minimum front setback established by
the zone in which the property is located as found in Section 3.03 or 25 percent of the
average depth of the lot whichever is less.
2. Land Takings-Any land taken by eminent domain or conveyed for a public purpose shall not
be deemed in violation of this provision. Any setback, or lot that is reduced below the
minimum dimensional requirements as a result of land taken by eminent domain or
conveyed for a public purpose shall not be deemed nonconforming. Setbacks for the
enlargement of any existing building located on such a lot shall be referenced to the property
9
line as it was located prior to the eminent domain action or the conveyance for a public
purpose.
3. Non-Conforming Residential Structure Expansions -A legal non-conforming residential
building may not be enlarged beyond the size permitted by dimensional regulations for
buildings in said district except that an existing non-conforming building line parallel to the
property line may be extended, but in no case shall the yard setback requirement for said
addition be reduced to less than five feet.
4. Non-Conforming Non-Residential Structures -An existing lawfully non-conforming, non-
residential building or structure may be extended or enlarged, provided that it satisfies the
following criteria:
a. Any enlargement shall only be used to accommodate the needs of the existing use or
different conforming use proposed to occupy the entire structure as outlined by the
applicant.
b. An enlargement which purpose is to provide for additional floor space as a result of
the addition of a new business under separate ownership shall not be allowed.
Section 2.08 Applications
To facilitate the expeditious carrying out of any and all of the responsibilities outlined in this
ordinance, the Code Enforcement Officer, the Planning Board, and the Zoning Board of Appeals are
respectively authorized to prepare and publish such application forms and procedures as necessary.
Application forms should elicit as much or all of the information which the officer or board will
require from the applicant. If an application form is not completely filled out or if the
circumstances of a particular case require it, the officer or board may request such additional
information as is necessary to allow full review and evaluation of the pending issue. Applications
for Code Enforcement Officer or board action shall not be deemed complete until all information
which has been validly requested has been furnished. All completed application forms and
supporting materials are public records which shall be kept on file in the Code Enforcement
/Planning Office and which may be inspected by any member of the public at reasonable times.
(Amended 3/11/2000)
Applications for Code Enforcement Officer or board action may not be made by any party other
than the owner of record or the lessee of the land which will be directly affected by the requested
action or by an option or contract to purchase such land. The land owner/applicant may through
written permission assign a representative to speak on their behalf.
Section 2.09 Site Plan Review
Site Plan Review and Approval by the Planning Board shall be required before issuance of a
building permit for any
-
new non-residential building or structure
-
expansion of a non-residential building or structure with a cumulative lifetime expansion
over 2500 square feet
-
any Conditional Use
-
mobile home park or
-
multi-family residences with more than two dwelling units as provided in the Town of
Waterboro Site Plan Review Ordinance Adopted June 28, 1988. (Amended 04/26/2003)
-
Mobile Vending Food Truck Park
Site Plan Review and Approval shall not be required:
1. To change a use permitted by the zoning ordinance to another permitted use, in an existing
structure, provided;
a. The change does not increase the requirements for off-street parking, as provided by the
Zoning Ordinance for the Town of Waterboro; and
b. No structural changes are proposed for the existing building when they are less than
2500 square feet as a cumulative lifetime expansion and
c. No changes are proposed for the site on which the existing building is located.
2.
For single family dwellings and accessory structure.
3.
For multi-family dwellings of no more than two dwelling units and their accessory facilities.
4.
Any development reviewed by Planning Board as a residential subdivision. (Amended
04/27/2002)
A. Site plan review shall operate in conjunction with the applicable provisions of this Ordinance,
Land Subdivision Regulations (where applicable) and Road Standards of the Town of
Waterboro. Compliance with all applicable zoning requirements shall be a prerequisite to
obtaining site plan approval.
B. All applications for Site Plan Review shall be filed concurrently with the Town Planner and
Code Enforcement Officer. The application shall also include twelve (12) copies of a 24 x 36
plans drawn to a scale of not greater than 1" to 100' showing the following features, both
existing and proposed:
1.
Boundaries of the site and abutting streets with widths indicated.
2. Footprints of all buildings - showing the number of stories, access and use.
3. Layout and location of off-street parking; loading; and access drives; and vehicular
maneuver-areas to conform with the standards set forth in Article 5 of this Ordinance.
4. Location and size of all signs, gasoline pumps, and other freestanding structures.
5. Location, direction, and type of outdoor lighting.
6.
Location and type of screening and/or buffers and other landscaping.
7.
Location of all utilities.
11
8.
Topography of a contour interval not greater than two feet showing the effects of
drainage from the site upon adjacent property. A greater contour interval may be used if
the Planning Board determines that the plan is adequate to evaluate site conditions.
9. The applicant shall, in addition, submit for any project utilizing an on-site septic disposal
system if the septic system has a design system flow in excess of 800 gallons/day or if
predominantly made up of non-typical septic waste, a hydrogeological impact study
prepared by a State of Maine licensed Geologist or a State of Maine licensed
Professional Engineer with experience in hydrogeology. This study shall contain, at a
minimum, the following components:
a.
A map showing the soil types using the Unified Soil Classification System
(USCS).
b.
Groundwater levels and flow rates through the site, and the aquifer type.
c.
An analysis of surface drainage conditions and their relationship to off-site
conditions.
d. Data on existing groundwater quality and quantity for the site. Collection of this
data can either be provided by test wells on the proposed site or by_existing wells
on abutting properties, provided that the data collected from those wells would
represent the groundwater on the site. If public water is to be used, the applicant
shall submit a written statement from the Waterboro Water District that it can
provide adequate water service to the proposed development
e.
A calculation of average nitrate nitrogen levels on-site after development and a
calculation of nitrate nitrogen levels at the down-gradient property line(s). These
calculations should be done under simulated conditions of both normal rainfall
and drought.
f.
A map showing the recommended sites for the subsurface wastewater disposal
system(s) and well(s) on the site.
C. There shall be a Site Plan Advisory Committee consisting of the Town Planner, Code
Enforcement Officer, Public Works Director and Fire Chief. This committee shall review the
application and evaluate its compliance with the Zoning Ordinance, and shall within seven (7)
business days of receipt of a complete application:
Forward a memo to the Planning Board for its consideration during the Board's review and
deliberation on the pending application. This information is only advisory to the Board.
D. The Administrative Assistant shall within five (5) business days after receiving a Site Plan
Review packet from the Town Planner and Code Enforcement Officer, identify the next
available Planning Board meeting, schedule the application for Planning Board review; and
notify the applicant, the Board of Selectmen, the Chief of the Fire Department, the Public
Works Director and the Chairs of the Economic Development and Road Review Committees.
12
E.
Owners of abutting property and property located within 500 feet of the subject parcel shall be
notified by the applicant at the applicant's expense, by certified mail of the date, time and
purpose of that initial meeting. The applicant shall provide a list of all persons to whom notice
has been sent, together with their current mailing addresses based upon the Town's assessing
records, to the Administrative Assistant prior to the meeting with the Planning Board.
Section 2.10 Site Plan Review Standards
A In reviewing a site plan application, the Planning Board shall require the applicant to
provide written evidence that the following standards have been met unless they are
found to be not applicable to a particular project:
1. The proposed development meets the definitions and/or requirements set forth in the
Zoning Ordinance;
2.
The proposed development will not create fire safety hazards by not providing adequate
access to the site, or to the buildings on the site, for emergency vehicles; or adequate fire
suppression systems.
3. The proposed exterior lighting will not create hazards to motorists traveling on adjacent
public streets; be inadequate for the safety of occupants or users of the site or will
damage the value and diminish the usability of adjacent properties;
4. The provisions for buffers and on-site landscaping provides adequate protection to
neighboring properties from detrimental features of the development;
5. The proposed development will not have a significant detrimental effect on the use and
peaceful enjoyment of abutting property as a result of noise, vibrations, fumes, odor,
dust, glare or other cause;
6. The provisions for vehicular loading and unloading and parking and for vehicular and
pedestrian circulation on the site and onto adjacent public streets will not create hazards
to safety or will not impose significant burdens on public facilities which could be
avoided by reasonable modification of the plan;
7.
The bulk, location, height or design of proposed buildings, structures or paved areas, or
the proposed uses thereof, will not have a significant detrimental effect on private
development on adjacent properties, or on the value of adjacent properties which could
be avoided by reasonable modifications of the plan;
8. The design of the site will not result in significant flood hazards or flood damage and is
in conformance with applicable flood hazard protection requirements;
9. Adequate provisions have been made for the disposal of wastewater or solid waste or for
the prevention of ground or surface water contamination;
10. Adequate provisions have been made to control erosion or sedimentation;
13
11. Adequate provisions have been made to handle storm water run-off or other drainage
problems on the site and any proposed stormwater detention ponds are adequate to serve
stormwater on or from the site;
12. The proposed water supply will meet the demands of the proposed use and is adequate
for fire protection purposes;
13. Adequate provisions have been made for the transportation, storage and disposal of
hazardous substances and materials as defined by state law and the Hazardous Waste
Ordinance;
14. The proposed use will not have an adverse impact on significant scenic vistas or on
significant wildlife habitat which could be avoided by reasonable modification of the
plan;
15. The project will not increase nitrate nitrogen concentrations in surface or groundwater at
the property line of the site in excess of State of Maine Drinking Water Standards. If
groundwater contains contaminants in excess of the primary drinking water standards
and the project is to be served by on site groundwater supplies, the applicant shall
demonstrate how water quality will be improved or treated to meet applicable standards.
B. Statement of Findings: All findings by the Planning Board under this section shall be
accompanied by written statements that set forth with particularity the precise reasons why the
findings were made. The Statement of Findings shall be provided to applicant within ten (10)
business days after vote and adjournment.
Section 2.11 Administration
A. Where the Board determines that, due to conditions existent in a proposed development, the
provision of certain improvements otherwise required by this ordinance is not necessary to the
public interest, or is inappropriate because of inadequacy or lack of prerequisite facilities in
proximity to the proposed site, it may waive such requirements, subject to appropriate
conditions as will, in its judgment, secure substantially the objectives of the requirements so
varied or modified, and of this ordinance in general. The Planning Board shall require a public
hearing upon initial review of the application and at any point thereafter, with applicant bearing
all responsibility for the cost of the hearing notice and the responsibility to notify abutters within
7 days prior to the hearing by certified mail. The applicant shall provide proof of the certified
notices to the town. The remaining balance due, if any, shall be paid prior to final plan
approval.
B. If the Planning Board requires professional services to evaluate a proposal's or design's
compliance with this ordinance, the expense of that review shall be borne by the applicant. The
town's planning staff is considered to provide professional services to the community. The
town staff shall provide the first five (5) hours of time on any project being reviewed by the
Planning Board at no cost to the applicant. The estimated cost of the consultant's review fees
shall be paid by the applicant to the Planning Board at the time the design subject to review is
submitted. The remaining balance due, if any, shall be paid prior to final plan approval.
14
C. Applicant shall provide a certified as built plan at the completion of the project to insure the
construction was built according to the approved plans.
D. The Planning Board shall require as a condition of approval that the applicant employ a clerk of
the works to certify that the project is being built according to the approved plans except where
the board finds that extraordinary hardship will result from strict compliance with this
requirement and votes to grant a waiver.
E. The Planning Board shall, based on the standards in section 2.10 above, approve; approve with
conditions; or deny the application and forward its action in writing to the Code Enforcement
Officer, the applicant, and all parties entitled to notice under Section 2.09.E. The decision shall
include written findings of fact and conclusions in support of the Board's decision.
F. Appeals involving an action of the Planning Board under this ordinance shall be to Zoning
Board of Appeals.
G. Failure to comply with any conditions of the Site Plan Review subsequent to the receipt of a
building permit or certificate of occupancy shall be construed to be a violation of this ordinance
and may result in a stop work order from the Code Enforcement Officer.
H. Each applicant shall pay a filing fee in the amount determined by the current Site Plan
Application Fee Structure at the time the application is submitted and consultant fees as required
by Article 2 Section 2.11.B. See current Site Plan Application Fee Structure for any additional
site plan fees. The applicant shall also pay costs associated with advertising and mailing. In
addition, prior to receiving approval of any application, the applicant shall pay to the Town all
of its reasonable costs associated with legal advertisements and other out of pocket expenses
applicable to the application. Out of pocket expenses are all expenses or costs for legal advice
and technical consultation or advice that the Planning Board deems necessary to process the
application. Technical Consultation shall include the use of any town staff that are contracted to
work for the town of Waterboro. The town staff shall provide the first five (5) hours of time on
any project being reviewed by the Planning Board at no cost to the applicant.
I.
Violations of this Ordinance shall be subject to enforcement under the provisions of 30-A,
M.R.S.A. Sec 4452.
J.
A temporary Certificate of Occupancy may be issued until all improvements shown on site plan
are installed or a sufficient Performance Guarantee has been posted for improvements not yet
completed (including but not limited to grading, drainage, paving, planting, and landscaping).
K. The approval of the Planning Board shall expire if work on the development is not commenced
within two (2) years, or completed within two (2) years of the issuance of the building permit.
The Board may by formal action grant an extension of the completion deadline for an additional
period not to exceed one (1) one year extension.
L. In all zones where single-family homes are allowed, no more than 2 dwelling units shall be
allowed on a parcel unless the minimum lot size per home can be met in the base zone. In the
vicinity of the Village, General Purpose, and Agricultural / Residential Zones, from 1066 Main
Street, North to the intersection of Route 5 and West on Route 5 to John Smith Way, up to 4
homes may be allowed on vacant land provided the lot can meet the minimum lot size per unit
for that zone.
15
Section 2.12 Reserved
16
17
Article 3 Zoning Districts
Section 3.01 General
For the purpose of this ordinance the Town of Waterboro is divided into the following zoning
districts; a Village district (V); a Village/Residential district (VR); an Agriculture/Residential
district (AR); a Forest/Agriculture district (FA); a Conservation district ( C), and a General Purpose
(GP) district. In addition to these districts, the Town of Waterboro also has two (2) overlay
districts; the Shoreland Overlay Districts divided into five (5) sub-districts: Resource protection,
Limited Residential, Limited Commercial, Stream Protection and General Development District;
and the Well Head Protection Districts divided into three (3) sub-districts: District #1, District #2
and District #3 described in Section 4.07. (Amended 06/3/1995, 03/11/2000, 06/24/2000,
04/27/2002, 04/26/2003)
For purposes of this ordinance, retail marijuana establishments, including retail marijuana stores,
retail marijuana cultivation facilities, retail marijuana products manufacturing facilities, retail
marijuana testing facilities, and retail marijuana social clubs are defined as set forth in 7 M.R.S.A.,
§ 2442.
Retail marijuana establishments, including retail marijuana stores, retail marijuana cultivation
facilities, retail marijuana products manufacturing facilities, retail marijuana testing facilities, and
retail marijuana social clubs, as either a principal use or an accessory use, are expressly prohibited
in Waterboro.
No person or organization shall develop or operate a business that engages in retail sales of
marijuana or any retail marijuana product, both as defined by 7 M.R.S.A., § 2442.
This prohibition does not include rules or regulations pertaining to the growing or distribution of
Medical Marijuana which is defined in Article 12 Definitions of this ordinance.
Section 3.02 Zoning Map
The boundaries of these zones are established by the enactment or later amendment of this
Ordinance and are as shown on the Official Zoning Map of the Town of Waterboro, dated February
7, 1977; the Town of Waterboro Wellhead Protection Zone Map; and on the 1970 Town Tax Maps.
The Official Zoning Maps are integral parts of this certified copy of the zoning ordinance (maps and
text) and shall be available to the public at all times in the Town Clerk's Office. The February 7,
1977 zoning map, and as further amended from time to time, was drafted so that the zoning district
boundaries followed property lines as depicted on the 1970 tax maps. It should be interpreted
accordingly. (Amended 03/11/1989, 03/11/2000, 04/26/2003
18
Section 3.03 Summary of Dimensional Regulations Contained in Article 3
MINIMUM
MINIMUM MINIMUM
MINIMUM
ROAD&
FRONT
SIDE&
MINIMUM
MAXIMUM
ZONING
LOT
SHORELAND
YARD
REAR*
SHORELAND BUILDING
DISTRICT
SIZE
FRONTAGE SETBACK
SETBACK SETBACK
HEIGHT
Village
20,000
100'
25'
20'
100'
35'
40 000
100'
50'
20'
100'
35'
Village &
20,000
l00'excegt on
40'
20'
100'
35'
Residential
50' a cul-de-sac
Residential
40 000
150'
50'
35'
100'
35'
Agriculture I
Residential
80 000
150'
75'
35'
100'
35'
Forest I
Agriculture
5 acres
200'
100'
50'
100'
35'
Conservation
10 acres
200'
100'
50'
100'
35'
General Pumose 40,000
150'
50'
35'
100'
35'
80 000
150'
50'
35'
100'
35'
(Amended 03/11/2000 and 04/27/2002).
*NOTE: In any case where structures are in existence at the time of the enactment of this
ordinance, additions may be made to within ten (I 0) feet of the side or rear lot line but in no case
should the buildings on one lot be closer than twenty (20) feet to a building on an abutting lot.
Lots divided by district boundaries: When a lot is divided by a land use district boundary, other
than the boundary to an overlay zone, the following rules shall apply:
A. On lots two acres or less in area, the lot shall be used as if the entire lot were in the district
which comprises the larger portion.
B. On lots larger than two acres, the applicable district regulations shall be followed in the portion
of the lot located in that district. (Amended 04/26/2003).
"Wheelchair ramps are exempt from the side, rear, and front yard setbacks, but not from the
shoreland setback, providing they meet the performance standards in Article 7 and Article 4 as
determined by the Planning Board" (Amended 03/09/1991).
One (1) standard size entry deck (4' x 4') and steps are exempt from the sideline and front yard
setback in all districts. (Amended 03/11/2000).
Accessory structures 100 square feet or less in size are not required to meet setback requirements.
No more than two sheds which do not meet setback requirements may be constructed on any lot.
19
The following highways are defined as State-Aid roadways:
Route 202 (4), Route 5, Townhouse Road, Old Alfred Road, West Road, Goodwins Mills Rd,
Federal Street, Chadbourne Ridge Road(From Route 5 to Intersection of Brick House Road).
Applicability of front yard setback requirements to private rights-of-way:
Easements: If a private right-of-way is an easement, all existing and future structures on the land
subject to that easement must be located a sufficient distance from the sideline of the right-of-way
to comply with the front yard setback requirements imposed by this Article.
Deeded Rights-of-way: If a private right-of-way is created by deeded ownership of land, all
existing and future structures on the parcel of land of which the right-of-way was originally part
must be located a sufficient distance from the sideline of the right-of-way to comply with the front
yard setback requirements imposed by this Article.
Exemption: Land adjacent to the private right-of-way is exempt from the front yard setback
requirements imposed by this Article, provided all of the following requirements are satisfied:
a) The adjacent land is not owned by the owner or the owner of the fee interest in the right-of-way;
and
b) At least one lot boundary abuts another public or private right-of-way and front yard setback
requirements are satisfied on that lot boundary; and
c) All applicable side and rear setbacks are satisfied for all non-front yard boundaries.
Section 3.04 Village District (V)
The Village District includes land which at present is the most highly developed in the town. The
range of development activities is broad and includes commercial, industrial, and residential land
uses as well as supporting municipal services. This heterogeneous mix is not unattractive, however,
probably due to the relatively low (for urbanized areas) density of development. This ordinance
makes no effort to change the existing character of village life, mixed uses continue--indeed they
are preserved and fostered. No areas in the town have greater proximity to schools and essential
services or are better served by utilities and all-weather roads. At the same time the soil, slope, and
topographic characteristics of land in this district are excellent enabling sub-surface wastewater
disposal systems to operate efficiently and simultaneously providing adequate fresh water supplies.
In these circumstances care is taken to prevent over-development within the Village District.
The minimum lot size in the Village District is 20,000 sq. ft. or 40,000 sq. ft. depending on the land
use. No principal or accessory structure may be placed within twenty (20) feet of any side or rear
lot line. Such structures must be set back twenty-five (25) feet from the front lot line of a 20,000 sq.
ft. lot, fifty (50) feet from the front lot line of a 40,000 sq. ft. lot and one hundred (100) feet from
the normal high water mark of any lake, river, or stream, except that docks, and similar facilities
may be placed on the shore subject to the provisions in the Shoreland Zoning Ordinance. No
principal or accessory structure may exceed thirty-five (35) feet in height. See Section 2.05 for
minimum lot width and frontage requirements.
20
Subsection 3.04.01 Primary Uses and Structures
A. Permitted Lot Size 20,000 sq. ft.
1. Retail shops and service stores (repair shops, barbers, beauticians, cleaners, etc.) with less
than one thousand ( 1000) sq. ft. of store area, except shops or stores requiring a daily water
consumption in excess of one thousand (1000) gallons.
2. Restaurants, lounges, cafes with less than one thousand (1000) sq. ft. of customer service
area, except those requiring a daily water consumption in excess of one thousand (1000)
gallons.
3. Bank, insurance, real estate, stock brokerage, general business offices with less than one
thousand (1000) sq. ft. of customer service area.
4. Newspaper, radio, or television offices, studios, facilities.
5. Signs not requiring a permit and signs requiring a permit (See Article 6).
B. Required Lot Size 40,000 sq. ft.
1. Single through multi-family residences at no greater density than one family unit for each
40,000 sq. ft. in the total parcel being developed.
2. Home occupations and professional home offices in accordance with the performance
standards of section4.05. (Amended 04/27/2002)
3. Police and fire protection facilities.
4. Outdoor recreation facilities including ball fields, parks, picnic areas, tennis courts, but not
golf courses or driving ranges.
5. Churches, public and private schools, and other public buildings or facilities.
6. Professional offices outside of the home (doctor, dentist, lawyer, engineer, accountant, etc.)
7. Retail and service stores (repair shops, barbers, beauticians, cleaners, etc.) with more than
one thousand (1000) sq. ft. of store area or that require more than one thousand (1000)
gallons of water daily, including all drive-in facilities.
8. Wholesale, warehouse and bulk storage facilities.
9. Clubs, lodges, meeting halls.
10. Funeral homes.
11 . Hospitals, nursing homes, sanitariums, etc.
12. Hotels, motels, inns providing overnight year-round, or seasonal accommodations, bar and
food service.
13. Gas stations, machinery and vehicle sales, service, washing, repair facilities.
14. Restaurants, lounges, cafes with more than one thousand (1000) sq. ft. of customer service
area or that require more than one thousand (1000) gallons of water daily.
15. Indoor recreation facilities including bowling alleys, skating rinks, swimming pools, etc.
16. Bank, insurance, real estate, stock brokerage, general business offices with more than one
thousand (1000) sq. ft. of customer service and office area.
17. Antique Shops (Amended 06/24/2000)
18. Contractor Business (Amended 04/26/2003)
21
Subsection 3.04.02 Conditional Uses and Structures
A. Required Lot Size 40,000 sq. ft.
1. Clustered single through multi-family residences at no greater density than one family unit
for each 40,000 sq. ft in the total parcel being developed.
2. Day Care Facility and Home Day Care providers. All facilities shall be required to
construct a fence that the Planning Board deems to enclose the outdoor activity area of the
facility. The fence shall be a minimum of 4' in height. (Amended 04/27/2002)
3. Planned unit developments (hereafter referred to as PUD's) limited to residential, resort,
recreational, and commercial activities or combinations of the above including bar and food
service. Residential PUD's may not exceed one family unit for each 40,000 sq. ft. in the
total parcel being developed.
4. Communications towers and high voltage transmission poles, lines, unmanned substations,
etc. (Amended 04/27/2002)
5. Cemeteries.
6. Processing facilities related to Agriculture or Wild Game.
7. Storage and selling of local farm, orchard, or forest products.
8. Horticultural activities including nurseries, greenhouses and commercial sale of such
products.
9. Wood products processing facilities (sawmills, lumberyards, etc.)
10. Fabricating, manufacturing, light industrial activities and facilities with less than five
thousand (5000) sq. ft. of work area.
11 . Bulk Oil, Gasoline Storage, Bulk Propane Storage including: Propane tank refill station and
small propane tank swap cages, Cement Mixing, and General Construction Facilities: Bulk
Fuel Oil, Gasoline Storage, Propane tank refill station and small propane tank swap cages,
Cement Mixing General Construction Tanks, Trucks, equipment and facilities.
Notwithstanding any provision of this ordinance to the contrary, all of the above uses must
be on the parcels not less than five (5) acres in size. (Amended 9/21/2021).
12. Mobile classrooms in conformance with Section 4.02. (Amended 03/11/2000)
Section 3.05 Residential District (R)
The Residential District includes land which is generally well suited for and capable of sustaining
higher densities of development than presently exist because of its proximity to schools and other
municipal services. It is also well served by public utilities and all-weather roads. The soils, slope
and topographic characteristics of land in this district are almost uniformly good enabling
subsurface wastewater disposal systems to operate efficiently and simultaneously providing
adequate fresh water supplies. The process of transition from relatively low impact farm and forest
uses to more intensive residential and commercial land use activities is clearly evident. Much of the
recent subdividing activity within the town has taken place on land which is in the Residential
District. This trend will almost certainly continue.
Subsection 3.05.01 Primary Uses and Structures
1. Single family residences
2. Multi-family housing units
22
3. Mobile home parks
4. Outdoor recreation facilities including ball fields, parks, picnic areas, beach areas, tennis
courts, golf courses, driving ranges, etc.
5. Home occupations
6. Professional offices
7. Municipal Facilities
8. Signs not requiring a permit and signs requiring a permit
9. Antique Shops
Subsection 3.05.02 Conditional Uses and Structures
1. Clustered housing developments.
2. Day Care Facility and Home Day Care providers.
3. PUD's limited to residential.
4. Communications towers and high voltage transmission poles, lines, unmanned substations, etc.
(Amended 04/27/2002)
5. Cemeteries.
6. Churches.
7. Public and private schools.
8. Buildings or facilities used for public and private gatherings.
9. Storage and selling of local farm, orchard, or forest products on parcels with direct access to a
state aid highway.
10. Horticultural activities, including nurseries, greenhouses, and commercial sale of such products
on parcels with direct access to a state aid highway.
11. Bed and Breakfasts.
12. The keeping of farm animals at a density as listed in the Definitions section of the ordinance.
Section 3.06 Agriculture and Residential District (AR)
Much of the land in this district is being used and in the foreseeable future will continue to be used
as forest and farm land even though it is generally suitable for higher densities of development than
presently exist. Land in this district has reasonable proximity to schools and other municipal
services and is reasonably well served by utilities and all-weather roads. Though there is some
variableness, the soils, slope and topographic characteristics of land in this district are above
average and are usually capable of sustaining subsurface wastewater disposal systems and
simultaneously providing adequate fresh water supplies.
Subsection 3.06.01 Primary Uses and Structures
1. Single through four family residences
2. Farming, grazing, poultry and livestock raising including farm animals not to exceed a
density as listed in the Definitions section of the ordinance.
3. Orchards.
4. Hatchery facilities.
5. Outdoor recreation facilities including park or picnic areas, beach areas, tennis courts, golf
courses, driving ranges, etc.
6. Harvesting of wild crops, grasses, etc.
23
7. Horticultural activities including nurseries, greenhouses, and commercial sale of such
products.
8. Storage and selling of local farm, orchard or forest products.
9. Commercial stables.
10. Commercial breeding, raising and care of dogs, cats, mink, rabbits and other domesticated or
fur bearing animals.
11. Municipal facilities.
12. Churches, public and private schools and other public buildings or facilities.
13. Veterinary offices and facilities.
14. Antique shops.
15. Professional office.
16. Clubs, lodges, meeting halls.
17. Funeral homes.
18. Home Occupations.
19. Contractor Business (Amended 04/26/2003)
Subsection 3.06.02 Conditional Uses and Structures
1. Clustered and single through four family residences at no greater density than one family unit
for each 80,000 sq. ft. in the total parcel being developed.
2. Day Care Facility and Home Day Care providers.
3. Commercial campgrounds.
4. Communications towers, high voltage transmission poles, lines, unmanned substations, etc.
(Amended 04/27/2002).
5. Extraction of rock, sand and gravel.
6. Cemeteries.
7. Marinas.
8. Processing facilities related to Agriculture or Wild Game.
9. Wood products processing facilities (sawmills, lumberyards, etc.)
10. Junkyards, dumps, and solid waste disposal areas but not within five hundred (500) feet of
any residence, camp, or waterbody, and only if appropriately screened.
11. Nursing homes, etc. on parcels with direct access to a state aid highway. (Amended
04/27/2002)
12. Bed and Breakfasts
13. Machinery, vehicle and farm equipment sales, service, repair facilities with a total building
area not to exceed five thousand (5,000) sq. ft. with direct access to a state aid highway.
(Amended 04/27/2002).
14. Restaurants, lounges, cafes on parcels with direct access to a state aid highway.
15. Fabricating, manufacturing, light industrial activities and facilities with less than five
thousand (5000) sq. ft. of building area on parcels with direct access to a state aid highway.
(Amended 04/27/2002).
16. Daycare Facility and Home Day Care providers.
17. Private airplane runway strips. (Amended 06/5/1993 and ratified 04/27/2002).
18. Mobile classrooms in conformance with Section 4.02. (Amended 3/11/00).
19. Medical Marijuana Grow-Only Facility. (Amended 02/22/2011 by Selectmen vote)
20. Solar Array
24
21. Bulk Oil, Gasoline Storage, Bulk Propane Storage including Propane tank refill station and
small propane tank swap cages, Cement Mixing, and General Construction Facilities: Bulk
Fuel Oil, Gasoline Storage, Propane tank refill station and small propane tank swap cages,
Cement Mixing General Construction Tanks, Trucks, equipment, and facilities.
Notwithstanding any provision of this ordinance to the contrary, all of the above uses must be
on parcels not less than five (5) acres in size. (Amended 9/21/21).
Section 3.07 Forest and Agriculture District (FA)
The Forest and Agriculture District includes land which is not presently well suited for high
density development because of lack of proximity to schools and other municipal services and the
inadequacy of utilities and roads within and connecting these lands to other more developed
portions of the town. Much of the land in this district has historically and is today being used for
agriculture and timber production purposes. Existing holdings are large, many in excess of one
hundred (100) acres. There is little evidence of transition to more intensive land use activities. The
soils, slope and topographic characteristics of land in this district are mixed. Some areas will not
readily support subsurface wastewater disposal systems. Other areas, if the aforementioned
impediments to development were removed, could sustain higher density development than this
ordinance now permits.
Subsection 3.07.01 Primary Uses and Structures
1. Single family residences.
2. Farming, grazing, poultry and livestock raising including farm residences.
3. Orchards.
4. Outdoor recreation facilities including park or picnic areas, snowmobile trails, beach areas,
tennis courts, golf courses, driving ranges, etc.
5. Horticultural activities including nurseries, greenhouses, tree farms & commercial sale of
such products.
6. Storage and selling of local farm, orchard or forest products.
7. Commercial stables.
8. Churches.
9. Commercial breeding, raising and care of dogs, cats, mink, rabbits and other domesticated
or fur bearing animals.
Subsection 3.07.02 Conditional Uses and Structures
1. Clustered single family residences.
2. Duplex residences and clustered duplex residences at no greater density than one dwelling
unit for each 5 acres being developed
3.
Day Care Facility and Home Day Care providers.
4. Commercial campgrounds
5. Communications towers, high voltage transmission poles, lines, unmanned substations, etc.
(Amended 04/27/2002).
6. Mining operations
7. Cemeteries.
8. Municipal facilities
9. Marinas
25
10. Processing facilities related to orchard and agricultural products, including poultry and
livestock.
11 . Wood products processing facilities ( sawmills, lumberyards, etc.)
12. Veterinary offices and facilities.
13. Solar Array
Section 3.08 Conservation District (C)
The Conservation District includes land which is least suited for and least able to sustain high
density development because of its topography, elevation and soil types, or marshy character, its
lack of proximity to schools and other municipal services, the present inadequacy of utilities and
roads within and connecting these lands to other more developed portions of the town, and its
relatively natural unspoiled character, often in proximity to lake and other water bodies or steep
rocky slopes.
Subsection 3.08.01 Primary Uses and Structures
1. Single family residences.
2. Forestry.
3. Orchards.
4. Wildlife preserves.
5. Storage of local farm, orchard, or forest products.
Subsection 3.08.02 Conditional Uses and Structures
1. Horticultural activities including nurseries, greenhouses and commercial sale of such
products.
2. Commercial campgrounds
3. Selling of local farm, orchard or forest products.
4. Communications towers, high voltage transmission poles, lines, unmanned substations, etc.
(Amended 04/27/2002).
5. Cemeteries.
6. Municipal facilities
7. Commercial stables.
8. Farming, grazing, poultry and livestock raising including farm residences.
9. Outdoor recreation facilities including park or picnic areas, snowmobile trails, beach areas,
tennis courts, golf courses driving ranges, etc.
Section 3.09 Village/Residential District (VR) (Amended 03/11/2000)
The Village Residential District includes those lots existing within the Town of Waterboro on the
date of passage ofthis section which are subject to dues and fees of the Lake Arrowhead
Community and connected to the Lake Arrowhead Public Water System, as more particularly
described in Chapter 37 of the 1995 Maine Private and Special Laws.
Section 3.09.01 Primary Uses and Structures (Amended 03/11/2000, 06/24/2000)
26
1. Single-family residences
2. Home Occupations Manufactured Homes
3. Yard and Garage Sales
4. Office, maintenance, and recreational buildings (Note: text added because these uses exist today)
Section 3.10 General Purpose Zone (GP)
The General Purpose (GP) District includes land which at present is generally suited for the
development of broad uses including residential, commercial, and industrial. This area is widely
served by a public water system and would support commercial development. This area has access
to a state road.
Subsection 3 .10. 01 Primary Uses and Structures
1.
Retail shops and service
2.
Restaurants, lounges, cafes.
3.
Bank, insurance, real estate, stock brokerage, general business offices.
4.
Newspaper, radio, or television offices, studios, facilities.
5.
Single family homes
6.
Multifamily homes
7.
Home occupations
8.
Municipal facilities.
9.
Outdoor recreation facilities including ballfields, parks, picnic areas, tennis courts, golf
courses and driving ranges.
10.
Churches
11.
Public and private schools
12.
Public buildings or facilities.
13.
Professional offices (doctor, dentist, lawyer, engineer, accountant, etc.).
14.
Wholesale, warehouse and bulk storage facilities with ( one hundred thousand 100,000
square feet of area or less.
15.
Fabricating, manufacturing, light industrial activities and facilities with (one hundred
thousand) 100,000 square feet of area or less.
16.
Clubs, lodges, meeting halls.
17.
Funeral homes.
18.
Hospitals, nursing homes, assisted living facilities, etc.
19.
Single-family camps.
20.
Farming, grazing, poultry and livestock raising including farm residences.
21.
Forestry.
22.
Orchards.
23.
Wildlife preserves
24.
Commercial stables.
25.
Commercial breeding, raising, and care of dogs, cats, mink, rabbits and other
domesticated or fur bearing animals.
26.
Veterinary offices and facilities.
27.
Antique shops.
28.
Contractor Business (Amended 04/26/2003)
27
Subsection 3.10.02 Conditional Uses and Structures
1.
Retail shops and service stores with store area of more than 5,000 square feet.
2.
Clustered single through multi-family residences
3.
Day Care Facility and Home Day Care providers.
4.
Mobile home parks.
5.
Planned unit developments (hereafter referred to as PUD's) limited to residential, resort,
recreational, or combinations of the above including bar and food service.
6.
Communications poles, towers, lines, unmanned substations, etc.
7.
Storage and selling of local farm, orchard, or forest products.
8.
Horticultural activities including nurseries, greenhouses and commercial sale of such
products.
9.
Wood products processing facilities (sawmills, lumberyards, etc.).
10.
Fabricating, manufacturing, light industrial activities and facilities with more than ( one
hundred thousand) 100,000 square feet of area.
11.
Wholesale, warehouse and bulk storage facilities with more than ( one hundred thousand)
100,000 square feet of area.
12.
Bulk Oil, Gasoline Storage, Bulk Propane Storage including: Propane tank refill station
and small propane tank swap cages, Cement Mixing, and General Construction Facilities:
Bulk Fuel Oil, Gasoline Storage, Propane tank refill station and small propane tank swap
cages, Cement Mixing General Construction Tanks, Trucks, equipment and facilities.
Notwithstanding any provision of this ordinance to the contrary, all of the above uses must
be on parcels not less than five (5) acres in size. (Amended 9/21/2021).
13.
Commercial campgrounds.
14.
Marinas.
15.
PUD's limited to industrial and/or commercial with frontage on a state or federal aid
highway. PUD's providing resort and recreational facilities including overnight, year-
round, or seasonal accommodations, bar and food service.
16.
Machinery vehicle and farm equipment sales, service, repair facilities
17.
Mobile classrooms in conformance with Section 4.02. (Amended 03/11/2000)
18. Medical Marijuana Grow-Only Facility. (Amended 2/22/11 by Selectmen vote)
Section 3.11 Reserved
28
29
Article 4 Special Use Standards
Section 4.01 Special Requirements for Extraction Operation Approval
An applicant for an extraction operation conditional use permit must obtain and submit a
restoration/reclamation plan, erosion/sediment control plan, and Hydrogeological Study for review
and approval by the Planning Board before a permit of a new extraction operation can be granted.
Extraction operations in existence and actual operation on March 11, 1989 cannot be expanded to
encompass more than five (5) acres in area unless Planning Board approval of a suitable
restoration/reclamation plan, erosion/sediment control plan and Hydrogeological Study is first
obtained.
In preparing the plans for the extraction operation approval, the applicant shall use United States
Geological Survey (USGS) datum in establishing existing topography and final topography.
Description of the USGS datum, bench marks height as specified by the USGS shall be displayed
on the plans.
Owners of abutting property shall be notified by the applicant via certified mail of the date, time
and purpose of the appointment a minimum of seven (7) days prior to the appointment for the
applicant's extraction operation conditional use permit. Return receipts documenting that notice
shall be furnished to the Planning Board.
Applicants who are not required to obtain approval from the State of Maine Department of
Environmental Protection under the site location development law must obtain approval of their
restoration/reclamation plan, and erosion/sediment control plan, and Hydro geological study from
the York County Soil Conservation Commission and document that approval to the Planning Board.
The Planning Board shall not grant approval of an extraction operation unless the applicant
documents prior approval by either the Department of Environmental Protection or the York County
Soil Conservation Commission.
In addition, the Planning Board reserves the right to:
1. Hold a Public Hearing, pursuant to the provisions of Article 2, Section2.12, to either gather
additional
information, resolve conflicting information or to inform the public before deciding
an application to commence an extraction operation.
2. Hire outside professionals to evaluate a proposal or design's compliance with this Ordinance,
with the expense of the review borne by the applicant. The estimated cost of the consultant's fees
shall be paid by the applicant to the Planning Board at the time the conditional use application for
extraction operation is viewed. The remaining balance due, if any, shall be paid prior to the
issuance of a conditional use permit for an extraction operation. (Amended 03/10/1990).
30
Section 4.02 Mobile Classroom Regulations
Mobile classrooms will not be allowed in the municipality which do not provide the following
within the classroom:
A restroom facility;
Drinking water;
A temperature controlled environment
All classrooms must be equipped with:
An emergency fire warning system;
Fire extinguishers;
Communication system that operates in conjunction with the main building.
Mobile classrooms become a conditional use permit within any zone where a school is
permitted. (Amended 03/11/2000).
Section 4.03 Mobile Home Park
Please Note: 30-A, M.R.S.A. Section 4358, Regulation of Manufactured Housing, includes
specific definitions for Manufactured Housing. They can be found on a separate page, Maine
Revised Statutes, Title 30-A, Regulation of Manufactured Housing - Definitions Section.
A. Authority and Purpose
1.
Notwithstanding other provisions of this Ordinance, the Planning Board in reviewing and
approving a proposed mobile home park in the Residential Zone shall apply the provisions of this
section, as well as the requirements of the Waterboro Land Subdivision Regulations and
Waterboro Mobile Home Park & Trailer Park Ordinance. Where the provisions of this Section
conflict with specific provisions of the Town of Waterboro Land Subdivision Regulations and/or
the Town of Waterboro Mobile Home Park & Trailer Park Ordinance, the provisions of this
section shall prevail. (Amended 04/26/2003)
2.
The purpose of this section shall be to accommodate the creation and expansion of mobile
home parks in a manner that will encourage and provide for the:
a. Preservation of open space;
b. Creation of recreation areas;
c. Preservation of environmentally sensitive areas;
d. Preservation of natural features;
e. Promotion of a more efficient use of the land through the use of smaller
networks of utilities and streets.
3. Notwithstanding any provision in this ordinance, a person developing or expanding a
manufactured housing development has the burden of proving that development will not pollute a
public water supply or aquifer or violate any state law relating to land development, subdivision,
or use.
31
B. Performance Standards
All Standards found in M.R.S.A 30-A, §4358 shall be followed for the development of any Mobile
Home Parks.
Section 4.04 Campground Developments
(Amended 09/25/1990; 06/24/2016).
All campgrounds shall comply with state licensing procedures and regulations for campgrounds.
Campgrounds shall be open only from May 1st to October 31 st each year. From November 1st until
April 1st, all services such as water and electricity shall be turned off or disconnected and no person
shall occupy any site in the campground.
Campgrounds must maintain an internal all weather road system with all roads being 20 feet in
width, well drained, and lighted at an intensity of not less than two (2) foot candles or 21.5 lumens
at the ground level of any pole location. Internal roads should not dead-end. However, if a dead end
is proposed the design for the turnaround area shall be a hammer-head design meeting the
dimensions as shown in the diagram below. Two parking spaces shall be provided for recreational
vehicle sites. One parking space is required for each tenting camp site.
ACCEPTABLE ALTERNATIVE
TO 120' HAMMERHEAD
Campgrounds must provide a buffer strip at least 25 feet wide, planted with trees and shrubs or
retained natural vegetation, between the campground and adjacent lots. All camping sites and
facilities shall be screened from the view of any abutting residence within 200 feet. Campgrounds
which reserve areas for recreational vehicles shall provide at least one thousand two hundred and
fifty (1,250) sq. ft. for each camp site except those camping sites within the Shoreland Zone which
shall be 5,000 square feet in size. Tenting sites must provide a minimum site size of 1,000 square
feet. All camping spaces shall be at least 25 feet in width. In addition, all campgrounds shall
provide permanent all weather service structures, meeting all setbacks, suitably divided to provide
men's and women's toilet/privy facilities within a 500 foot radius of each camping space to be
served. Campgrounds that serve self-contained recreational vehicles with sewer and water
connections at each site shall be exempt from the 500-foot radius requirement for service buildings.
Laundry facilities or showers may be centrally located in a campground or contained in several
service buildings but all toilets must be installed in separate compartments. Bathroom facilities shall
be provided at a rate of one per every four un-sewered camping sites.
32
Campgrounds must provide a safe and reliable water supply for each recreational vehicle and
camping space at a rate of no less than fifty (50) gallons per day for each recreational vehicle and
campground space. Campgrounds must provide an internal sewage collection system to which all
suitable equipped recreational vehicles and any other toilet, washing or shower facilities in the park
or campground shall be connected. A wastewater treatment and sewage disposal system ( dump
station) approved by the State of Maine Department of Environmental Protection and Department of
Human Services may also be provided. All wastewater collection and disposal must meet state and
town plumbing codes and be installed and maintained by the campground operator.
Campgrounds are required to provide a suitable system for the storage, periodic collection, and
ultimate disposal of solid waste and garbage. Containers must be covered, rodent proof, and located
on suitable crushed stone or concrete pads. Such facilities must be within five hundred (500) feet of
each recreational vehicle or camping space.
Campgrounds are required to provide each recreational vehicle space with electricity of one
hundred and ten (110) volts per recreational vehicle. All installations shall meet state and town
electrical codes, be capable of functioning in all weather and be maintained by the campground
operator. Unless such electrical system is installed underground, sufficient overhead wire
clearance, no less than fourteen (14) feet from the ground, shall be maintained at all times.
No rigid enclosed addition may be affixed to any recreational vehicle other than a recreational
vehicle accessory enclosure as defined herein.
Section 4.05 Home Occupations
(Amended 09/25/1990 & 03/8/1997).
In addition to the limitations contained in the definition of a home occupation, "home
occupations" shall be subject to the following performance standards;
A. The home occupation shall be carried on primarily by a member or members of the
family residing in the dwelling unit and shall be allowed to employ 1 non-family
member but shall not alter the residential character of the property from its principal use
as a residence.
B. The Home Occupation or professional activity shall be carried on wholly within the
principal and/or accessory structure. No equipment or materials used in a home
occupation may be stored or stacked out of doors.
C. No mechanical, electrical, or other equipment which produces a nuisance, noise,
vibrations, smoke, dust odors, magnetic interference or electrical disturbance to the
exterior of the building inconsistent with a residential neighborhood may be used.
D. In addition to the off-street parking provided to meet the normal requirements of the
dwelling, adequate off-street parking shall be provided for the vehicles of each employee
and the vehicles of the maximum number of users the home occupation may attract
during peak operating hours. The traffic generated by such home occupation shall not
increase the volume of traffic so as to create a traffic hazard or disturb the residential
character of the immediate neighborhood.
33
E. One sign, no larger than nine (9) square feet including supporting structure, ( excluding
post) may be erected on the premises. There shall be no illumination of signs after 9:00
p.m.
F. The applicant shall make application to the Code Enforcement officer for review and
approval of the application which shall include a floor plan and parking lot layout along
with a written description of the proposed business.
Section 4.06 Wheelchair Ramp Which Does Not Meet Town Setback Requirements
1. The ramp shall be built according to IRC and Life Safety Building Codes.
2. It shall not be wider than 6 feet at any point.
3. It shall be constructed of wood or some other material which may be removed when the
need for the ramp no longer exists.
4. The applicant shall present to the Code Enforcement Officer written evidence that
someone who has resided in the house has become handicapped and needs the ramp.
5. The applicant shall present written evidence that it cannot be constructed within
configuration of the property and location of the structure being accessed.
6. The applicant shall present a written statement as to when the ramp will be removed. If
no date can be given, then the statement shall include a statement of events which shall lead
to removal. In no case can the property be transferred to a new owner until the ramp has
been removed.
Section 4.07 Wellhead Protection District WHPD
(Amended 06/5/1993, Amended by Selectmen vote 08/23/2011)
Subsection 4.07.01 General
The purpose of this district is to establish a protection district for wells intended to serve potable
water on a town or regional scale. The creation of the Wellhead Protection District is intended to
protect the quality and quantity of the present and future water resources of the communal potable
water systems regulating activities and land use practices within the well recharge area. This
protection is vital to preserving the health, safety, and general welfare of the households serviced by
potable water systems and the other residents of the Town.
The Wellhead Protection District shall be an overlay zoning district and therefore compliance with
all the requirements of the underlying zoning district(s) which the Wellhead Protection District
covers shall be maintained.
-
The Wellhead Protection District shall consist of all land delineated within that zone on the Town of
Waterboro Wellhead Protection Zone Map, as Amended.
34
Subsection 4.07.02 Permitted Uses and Structures
Any permitted uses and structures allowed within the underlying zoning district(s) (which the
individual Wellhead Protection district overlays), are subject to the provisions of Article 4, Section
4.07.
Subsection 4.07.03. Establishment of Zones
The Wellhead Protection District consists of two (2) zones that are shown on the official Town of
Waterboro Zoning Map or official Wellhead Protection District Map. The two zones are defined as:
A. Zone 1 : Immediate Recharge Area
Zone 1 includes the area immediately recharging the water supply, as shown on the official
Town of Waterboro Zoning Map or official Wellhead Protection District Map.
B.
Zone 2: Primary Recharge Area
Zone 2 includes the primary recharge area shown on the official Town of Waterboro Zoning
Map or official Wellhead Protection District Map.
C.
Land Use Table
Any proposed land use listed below is subject to the requirements of this section and applicable
performance standards. This section excludes residential activities except in instances that meet
applicable performance standard thresholds or where specific reference is made to residential
activity. All other uses not listed in this table are not permitted in both Zones 1 and 2.
Land Use
Zone 1
Zone
Applicable Performance
2
Standards
Agricultural chemical
Chemical Storage
N
PB
Chemical Use
spreading or spraying
Chemical Spreading/Spraying
Agricultural use of residuals
N
PB
Chemical Spreading/Spraying
Chemical Storage
Agriculture
N
PB
Chemical Use
Chemical Spreading/Spraying
Animal husbandry
N
PB
Chemical Storage
Wastewater and Solid Waste
Auto parts/supply
N
PB
Chemical Storage
Auto repair/body shop
N
PB
Chemical Use
Chemical Storage
Beauty parlor
N
PB
Chemical Use
Wastewater and Solid Waste
Boat builders, refinisher,
N
PB
Chemical Storage
35
Zone 1
Zone
Applicable Performance
Land Use
2
Standards
maintenance
Chemical Use
Bulk Fuel Oil Storage >275
N
PB
Chemical Storage
__gallons
Chemical Use
Car wash
N
PB
Wastewater and Solid Waste
Commercial vehicular
storage or parking;
N
PB
Vehicular Use and Storage
maintenance and refueling of
vehicles and equipment1
Concrete, asphalt, tar, coal
PB
Chemical Storage
N
Chemical Use
company
Chemical Storage
Dry cleaner
N
PB
Chemical Use
Essential operations of the
y
y
Water District
PB
Chemical Storage
Furniture stripper
N
Chemical use
Chemical Storage
Golf course
N
PB
Chemical Use
Chemical Spreading/S_2raying
Graveyard/ cemetery
N
PB
Chemical Spreading/S_2raying
Chemical Storage
Herbicide/Pesticide/Fertilizer
N
PB
Chemical Use
application2
Chemical Spreading/S_2raying
Herbicide/Pesticide/Fertilizer
N
PB
Chemical Storage
dealer
Chemical Use
Hoop houses and
N
PB
Chemical S_2reading/Sprayin__g_
_greenhouses
PB
Wastewater and Solid Waste
Junk or salvage yard
N
Chemical Storage
Chemical Use
Laundromat
N
PB
Wastewater and Solid Waste
PB
Chemical Storage
Machine shop
N
Chemical Use
Medical, dental, veterinarian
N
PB
Wastewater and Solid Waste
office
Mining (Sand & Gravel,
N
PB
Mining
Rock]
Chemical Storage
Mortuary /funeral parlor
N
PB
Chemical Use
36
Land Use
Zone 1
Zone
Applicable Performance
2
Standards
Multi-unit/family housing
N
PB
Wastewater and Solid Waste
Municipal wastewater
N
PB
Wastewater and Solid Waste
treatment plant
Nursery or garden shop
N
PB
Chemical Use
Chemical Spreading/Spraying
Oil pipeline
N
PB
Chemical Use
Chemical Spreading /Spraying
Painters, finishers
N
N
Chemical Use
Parking lot
N
PB
Storm water
Road maintenance
Photo processor
N
PB
Chemical storage
Chemical use
Printer
N
PB
Chemical storage
Chemical use
Railroad yard or line
N
PB
Chemical storage
Chemical use
Chemical storage
Recycling or processing
Chemical use
N
PB
Wastewater and Solid Waste
center ( other than beverages)
Storm water
Fill
Chemical storage
Research laboratory
N
PB
Chemical use
Wastewater and Solid Waste
Chemical storage
Rust proofer
N
PB
Chemical use
Wastewater and solid waste
Salt pile or sand and salt pile
N
PB
Chemical storage
( uncovered)
Septic system
New>l,000 gpd
N
N
New <1,000 gpd
N
CEO3
Wastewater and solid waste
Replacement< 1,000
CEO3
CEO3
gpd
Sewer lines
PB
PB
Wastewater
Solid waste
Small engine repair shop
N
PB
Chemical use
Storm water impoundment
N
PB
Storm water
or run-off area
Road maintenance
Utility Transmission Lines
PB
PB
Chemical Spreading/Spraying
37
Land Use
Wastewater treatment plant,
discharge
Notes
Land use key
Y=
permitted
N=
not permitted
Zone 1
N
Zone
2
PB
Applicable Performance
Standards
Wastewater and solid waste
1 - Short-term overnight parking may be allowed in
connection with other activities receiving a CEO or PB
permit. For example, short-term overnight parking of
construction vehicles on new permitted construction
projects.
2 - Unless a greater public health concern warrants
pesticide application. For example, Brown tail Moth
control.
3 - With notification made to the appropriate public
water supplier(s): the Waterboro Water District and/or
the Lake Arrowhead Association Department of Public
Works.
PB=
permitted subject to Planning Board Review and use of Best Management Practices that
pertain to the application
CEO= permitted subject to CEO Review and use of Best Management Practices that pertain to the
application
Subsection 4.07.04 Conditional Uses
Any conditional uses allowed within the underlying zoning district(s) (which the individual
Wellhead Protection district overlays), and not specifically prohibited in Subsection 4.07.03, shall
be conditional uses in this district and subject to Planning Board review pursuant to Article 2 of this
Ordinance.
Subsection 4.07.05 Conflict
If the provisions of this Article conflict with other requirements in this zoning ordinance, or with
requirements found in other ordinances of the Town of Waterboro, the stricter requirements shall
govern.
38
Subsection 4.07.06
Lot Specifications
A.
Minimum Lot Size
Zone
Land Area per Dwelling Unit
1
160,000 sq. ft.
2
80,000 sq. ft.
Areas served by public water have a minimum lot size of 40,000 square feet per dwelling
unit.
B.
Maximum Lot Coverage
For portions of lots within the Wellhead Protection District, the maximum lot area that can
be covered by impervious surfaces including parking areas, shall be as follows:
Zone
Maximum lot Coverage
1
30%
2
50%
Notwithstanding other provisions of the ordinance, lot coverage that exists as of the date of
adoption of this ordinance that equal or exceed the applicable percentage limitation may be
continued and may be expanded with Planning Board approval. Expansions of lot coverage
shall be limited to no more than ten percent ( 10%) of the portion of the lot located in the
Wellhead Protection District. However, the Planning Board shall not authorize expansion of
impervious surfaces of existing uses if the total coverage of all lot areas located in the
Wellhead Protection District is greater than fifty percent (50%) in Zone 1 or greater than
sixty-five percent (65%) in Zone 2.
Subsection 4.07.07. Application Requireme~ts
The Planning Board may modify or waive any of the following submission requirements if it
determines that, because of the size or nature of the project or circumstances of the site such
requirement(s) would not be applicable or would be an unnecessary burden upon the applicant and
would not affect or conflict with the purposes of this ordinance.
A.
All Applications
All applications shall follow submission criteria set forth in Section I. D. of the Site Plan
Review Ordinance.
B.
Independent Review and Advice
1.
Professional Services
The Planning Board or CEO may require an attorney or consultant to review and
advise on one or more aspects of an application for compliance or non-
compliance with this ordinance. The attorney or consultant shall first estimate
the cost of such review and the applicant shall deposit the Town the full
39
estimated cost, which the Town shall place in an escrow account. The Town
shall pay the attorney or consultant from the escrow account and reimburse the
applicant if funds remain after payment. The Town shall bill the applicant if the
actual cost exceeds the estimated cost. A certificate of occupancy will not be
issued until all costs associated with the project have been paid by the applicant.
2. Additional Studies
The Planning Board or CEO may require the applicant to undertake any study
they deem reasonable and necessary to determine whether a proposed activity
meets the requirements of this ordinance. The costs of such studies shall be
borne by the applicant.
C. Additional Application Requirements for Planning Board Review for Certain
Activities within the Wellhead Protection District
More than one of the categories listed below may apply to a particular use. Applicants
should request assistance from the Town Planner should there be questions as to which
categories apply.
1. Non-agricultural chemical use, storage and handling, (including petroleum
products)
a. Type and volume of chemical compounds handled and/or stored.
b. Site plan showing all storage, handling and use areas for raw materials and wastes.
c. For outside areas, details to contain spills include:
1. drainage and contour information to prevent the flow of runoff from entering
the storage area and which keep leaks or spills from flowing off site.
2. provisions to collect chemicals should they enter the drainage system.
3. provisions to segregate underground systems to ensure that there are no cross
connections.
4. provisions to prevent accidental containment breach by collisions.
5. Statement of emergency measures which can be implemented for surface
drainage systems.
d. For inside areas, details to contain spill including the:
1. design of dikes around rooms.
2. the location of floor drains, and floor drains outlets.
3. the location of separators, holding tanks and/or drain outlets.
4. the specific location and design of underground storage structures.
5. the location and design of piping systems for washing are discharged and that
wastes are discharged to appropriate sewers or treatment systems.
e. A spill prevention and control and countermeasure (SPCC) plan detailing:
1. materials and equipment to be available.
2. a training plan and schedule.
3. a list of contacts (EP AIDEP/local fire officials) with phone numbers.
4. an inspection schedule.
f. A report by an industrial engineer or other competent professional detailing:
1.
steps which have been taken to reduce the use of hazardous material.
2.
actions which have been taken to control the number of wastes generated.
40
3.
any reports to provide information on the design theory or methodology for
the above features.
2. Agricultural chemical use, storage and handling
a. Type and volume of chemical compounds handled and/or stored.
b. Intended use.
c. An Integrated Pest Management Plan.
d. An on-site soils evaluation to assess nutrient holding capacity and leachability of
the soils.
e. Plans for control of surface water run-off and erosion in areas where chemicals will
be applied.
f. Detailed report on type of chemical applied and rate of application.
g. Site plan showing all storage, handling and use areas for raw materials and wastes.
h. For outside storage, details to contain spills include:
1.
drainage and contour information to prevent the flow of runoff from entering.
2.
the storage area which keeps leaks or spills from flowing off site.
3.
provisions to collect chemicals should they enter the drainage system.
4.
provisions to segregate underground systems to ensure that there are no cross
connections.
5.
provisions to prevent accidental containment breach by collisions.
6.
Statement of emergency measures which can be implemented for surface
drainage systems.
1. For inside storage, details to contain spill including the:
1.
design of dikes around rooms.
2.
the location of floor drains, and floor drains outlets.
3.
the location of separators, holding tanks and/or drain outlets.
4.
the specific location and design of underground storage structures.
5.
the location and design of piping systems for washing are discharged and that
wastes are discharged to appropriate sewers or treatment systems.
J. A spill prevention and control and countermeasure (SPCC) plan detailing:
1.
materials and equipment to be available.
2.
a training plan and schedule.
3.
a list of contacts (EP A/DEP/local fire officials) with phone numbers.
4.
an inspection schedule.
k. A report by an industrial engineer or other competent professional detailing:
1.
steps which have been taken to reduce the use of hazardous material.
2.
actions which have been taken to control the amount of waste generated;
3.
any reports to provide information on the design theory or methodology for
the above features.
3. Vehicular use and storage
a. A site plan, drawn to scale, showing locations and designs of secondary
containment for fuel and storage and refueling pads.
4. Mining (Sand, Gravel and Rock)
a. A location map and site plan, drawn to scale, showing property boundaries,
stockpile areas, existing reclaimed and un-reclaimed lands, proposed maximum
acreage of all affected lands, erosion and sedimentation control, all applicable
41
private drinking water supplies or public drinking water sources and all existing
or proposed solid waste disposal areas.
b. A detailed report by a Maine Certified Geologist with experience in
hydrogeology attesting to the depth of the seasonal water table, and plan showing
benchmarked elevations for depth of excavation.
5. Subsurface injection
a.
Subsurface Wastewater Disposal
1. Soil evaluator's report and septic system design.
2. For sites/uses producing >800 gallons of sewage, a hydrogeological analysis
of nitrate concentrations at the property line.
b. Sewage Disposal
1. Evaluation of public/private sewer system capacity and integrity of sewer
lines serving the development by a Registered Engineer or the sewer system
superintendent.
c. Subsurface Injection
1.
Provisions and designs for all floor drains, grease traps, and holding tanks.
6. Stormwater Management
a. Narrative describing site layout, and on-site and off-site watershed hydrology,
including all new and existing buildings and facilities, which may be affected by
the site runoff. Provide total amount of impervious area created by the project.
b. Drainage plans showing all topographic features, such as buildings and other
facilities, drainage ways, cover types, roads, drainage easements and sub
catchment boundaries for pre-construction and post-construction conditions must
be shown on the plan. Show all hydrologic flow lines and hydrologic soil groups
boundaries on a plan and identify each sub catchment, reach and pond consistent
with the runoff model. For post construction conditions, show all new
stormwater management structures and changes to the hydrologic condition.
c. Stormwater runoff calculations for measured designed to meet the standards
listed in Section 4.07.07(G).
d. Designs, construction details and technical specifications for each stormwater
management measure that will be constructed, installed or managed on the site.
7. Utility Corridors
a. Type and volume of chemical compounds applied, handled or stored.
b. Site plan showing all areas of use areas for chemical compounds.
c. A spill prevention and control and countermeasure (SPCC) plan detailing:
1. materials and equipment to be available.
2. a training plan and schedule.
3.a list of contacts (EPA/DEP/local fire officials) with phone numbers.
4. an inspection schedule.
d. A r~port by an industrial engineer or other competent professional detailing:
1.
steps which have been taken to reduce the use of hazardous material.
2.
actions which have been taken to control the amount of wastes generated.
3.
any reports to provide information on the design theory or methodology for
the above features.
42
Subsection 4.07 .08 Performance Standards
A. General Provisions
All development located within the Wellhead Protection District shall comply with
the Performance Standards established in this section to protect the quality and
quantity of the public water supply.
B.
Performance Standards for Chemical Use
1. The use of chemicals or residuals shall not cause or contribute to the cumulative,
calculated or actual levels of any contaminants in the groundwater at the Water
District's property line to exceed 50% of the allowable Primary Public Drinking
Water Standards as defined by the Federal Safe Drinking Water act, as
Amended.
2. Only fertilizers containing predominantly slow release nitrogen and manure are
allowed. Fertilizers shall be applied at an agronomic rate based on annual soil
test results. Permit applications must be on an annual basis. Permit applications
shall include application materials and rates.
3. Only land application of pesticides with low leachability by Maine licensed
applicators is allowed. Provisions shall be made for control of surface run-off
and erosion in areas where pesticides are being applied. Permit applications
shall be submitted on an annual basis and shall include copies of the pesticide
labels and materials safety data sheets and the proposed rate of application. In
addition, a comprehensive Integrated Pesticide Management Plan certified by a
groundwater hydrologist should conclude the activity will have no unreasonable
adverse effects on groundwater. Annual reports detailing the type and amount
of substance reports as well as date and specific location of application shall be
submitted to the CEO annually.
C. Performance Standards for Chemical Storage
1. New installation of underground storage tanks are prohibited within the
Wellhead Protection District.
2. All chemicals must be stored under cover and on an impervious surface, without
floor drains.
3. Secondary containment of liquid chemicals equaling 110% of the stored product
must be provided.
4. Tanks for liquid chemical storage must be equipped with automatic shut-off
valves and high level alarms.
43
5. Any above-ground piping must be designed to prevent line breakage due to
collision.
6. All containers and piping must be constructed of corrosion resistant materials.
7. All containers must be clearly labeled with the chemical name and date of
purchase.
8. A Spill Prevention, Control and Countermeasures Plan (SPCC) must be
submitted to the CEO, Fire Department and the Water District.
D. Performance Standards Chemical Spreading/Spraying
1. Pesticide and herbicide application should be the option of last resort. Any
activity requiring the use of herbicides or pesticides must develop an Integrated
Pest Management Plan that details the conditions under which agricultural
chemicals are to be used. All pesticides shall be applied in accordance with
label directions and the regulations of the Maine Board of Pesticides Control.
2. Herbicides and pesticides must be applied only by certified applicators, who
must be informed regarding the delineated area of wellhead protection.
3. Evidence of a completed and approved State Certified Nutrient Management
Plan must be provided for all agricultural activities within the WHPD.
4. Fertilizer applications are to be tailored to the specific needs of the crop, as
determined by soil suitability analyses. Use of slow-release fertilizers is
preferred.
5. Irrigation schedules shall be coordinated with pesticide and nutrient application
to minimize the possibility of leaching. Pesticides and nutrients shall not be
applied to frozen ground, or applied immediately before storm events.
6. Notice of intent to apply agricultural chemicals shall be given to the CEO and
public water supplier prior to application.
7. Only Class "A" composted residuals may be used within WHPD. These
.residuals must have an approved Program License from the Maine Department
of Environmental Protection, and must be used in strict accordance with all
license provisions. Any non-composted residual or a residual not meeting the
Class "A" pathogen reduction standard should not be spread within the WHPD.
8. Manures must be composted to Class "A" standards.
9. Residuals and manures shall not be applied over very shallow soils (less than 1
foot) or exposed bedrock.
10. Residuals and manure shall not be applied on frozen ground, or immediately
before storm events.
44
E. Performance Standards for Non-Residential Vehicular Use and Storage
1. When draining oils or fluids from vehicles, precautionary measures such as
portable drip pans, must be taken to ensure that no spills occur.
2. All fuel oil, waste oil, lubricants, antifreeze, or other potential contaminants
must have permanently installed secondary containment equal to 110% of the
liquid volume stored, be covered by a permanent roof and be on a surface with
no floor drains.
3. No vehicle washing may occur.
4
Refueling vehicles must be equipped with a shovel, an impermeable container
with a volume of no less than 35 gallons and a tight fitting lid, and at least two
absorbent pads or pillows. An absorbent pad or portable drip catch must be in
place beneath the fill tube at all times during the refueling operation.
5. Refueling must occur on a concrete pad or other impermeable surface.
F. Performance Standards for Vehicular Parking and/or Storage
Any vehicle (both on- and off-road) with externally mounted fuel tanks in excess of 45
gallons must be parked on an impervious surface with no floor drains.
G. Performance Standards for Mining (Sand, Gravel and Rock)
1. Separation must be maintained between any excavation and any public drinking
water source as follows: (1) For systems serving a population of 500 persons or
less, the minimum separation must be 500 feet; (2) For systems serving a
population of 501 persons up to 1,000 persons, the separation must be 500 feet;
(3) For systems serving a population of more than 1,000 persons, the separation
must be 1,000 feet; and (4) For any system that holds a valid filtration waiver in
accordance with the federal Safe Drinking Water Act, the separation must be
1,000 feet.
2. Excavation may not extend below 5 feet above the seasonal high water table
without the submission of detailed findings of the depth of the water table.
3. No equipment debris,junk, or other material is permitted on an extraction site.
Any temporary shelters or buildings erected for such operations and equipment
used in connection therewith must be removed within 30 days following
completion of active extraction operations.
4. Within 6 months of the completion of extraction operations at any extraction site
or any one or more locations within any extraction site, ground levels and grades
must be established in accordance with the approved plans.
5. All debris, stumps, boulders, and similar materials must be removed or disposed
of in an approved location or buried and covered with a minimum of two feet of
soil.
6. The extent and type of fill must be appropriate to the use intended. The
applicant must specify the type and amount of fill to be used.
45
7. At least 4 inches of topsoil or loam must be retained or obtained to cover all
disturbed areas, which must be reseeded and property restored to a stable
condition adequate to meet the provisions of the "Erosion and Sediment Control,
Best Management Practices," published by the Maine Department of
Environmental Protection.
8. Unused gravel pits within the Wellhead Protection District shall be reclaimed
according to plans submitted to the Municipality.
9. Gravel mining activities in a Wellhead Protection District must have emergency
spill response plans.
10. Storage of fuels is prohibited within WHPD.
11 . Rock crushers are prohibited within WHPD.
12. There shall be no overnight storage of vehicles within the WHPD unless parked
over a secondary containment area.
H. Performance Standards for Wastewater and Solid Waste
1. Municipal wastewater disposal facilities, chemical waste disposal sites of any
kind, spreading of biosolids and incinerator ash except Class "A" residuals as
described in Subsection 4.07.08 of this Ordinance, solid waste landfills, log
storage yards and lumber yards, and other direct discharges shall be prohibited
in WHPD.
2. All new and replacement subsurface wastewater disposal systems shall submit
evidence of site suitability prepared by a Maine licensed site evaluator in full
compliance with the requirements of the State of Maine Subsurface Waste
Water Disposal Rules and for systems producing> 800 gallons of sewage, a
hydrogeological analysis of nitrate/nitrite impact study, with nitrate/nitrite
concentrations limited to 5mg/L at the property line.
3. Sewer pipes shall be gasketed when buried within Zone 1 of the WHPD.
I. Performance Standards for Stormwater Management
1. Stormwater management system must include treatment measures that will mitigate
for the increased frequency and duration of channel erosive flows due to runoff from
smaller storms, provide for effective treatment of pollutants in stormwater and
mitigate potential temperature impacts. This shall be achieved by using one or more
of the methods listed in this section to control runoff from no less than 95% of the
impervious area and no less than 80% of the developed area associated with a project
that is impervious or landscaped. The Planning Board may, on a case-by-case basis,
consider alternate treatment measures to those described in this section. An alternate
treatment measure must provide at least as much pollutant removal as the measures
46
described in this section and, unless otherwise approved by the Planning Board, as
much channel protection and temperature control.
a.
Wet pond with detention above the permanent pool. A stormwater
management system using detention to control runoff must detain, above a
wet pond's permanent pool, a runoff volume equal to 1.0-inch times the sub
catchment's impervious area plus 0.4-inch times the sub catchment's
landscaped area. The detained runoff must be discharged solely through an
under drained vegetated gravel filter having a single outlet having a diameter
no greater than eight inches. A wet pond must have a storage volume below
the permanent pool elevation at least equal to 1.5 inches times the sub
catchment's impervious area plus 0.6-inch times the sub catchment's non-
impervious developed area, a mean depth of at least three feet, and a length to
width ratio of 2: 1 or greater.
b. Filter. A detention structure using filters to control runoff must detain a
runoff volume equal to 1.0 inch times the sub catchment's impervious area
plus 0.4 inch times the sub catchment's developed area that is landscaped and
discharged solely through an underlined vegetated soil filter having a single
outlet with a diameter no greater than eight inches, or through a proprietary
filter system approved by the Planning Board.
c. Infiltration. A stormwater management system using infiltration to control
runoff must retain a runoff volume equal to 1.0-inch times the sub
catchment's impervious area plus 0.4 inch times the sub catchment's
developed area that is landscaped and infiltrate this volume into the ground.
Pre-treatment of stormwater must occur prior to discharge to the infiltration
area. The infiltration area must minimize discharge of soluble pollutants to
groundwater, and must be maintained to assure that its capacity for
infiltration and pollutant removal is unimpaired.
d. Buffers. A stormwater management system using buffers to control runoff
must meet the design criteria listed in the Maine Department of
Environmental Protection Stormwater Rules, 06-96 CMR 500, as Amended.
J. Performance Standards for Road Maintenance
1. Cover all sand, salt or sand/salt piles with a roofed structure capable of preventing both
contact with water and leaching of salt into groundwater. Tarps are not an acceptable
means to cover a sand, salt or sand/salt pile.
2. Prohibit snow dumps and/ or snow storage in all wellhead protection areas.
K. Performance Standards for Fill
1. Use only inert material (loam, sand, gravel, clay, rocks, bricks or concrete).
47
2. Use only clean fill (no non-natural odors, no staining, and not originating at a known
spill site).
3. Implement erosion and sedimentation control measures.
Subsection 4.07.09. Control of Existing Threats
A.
Inspection
The CEO shall follow the guidelines outlined in Article 2 of this ordinance.
B.
Monitoring
Whenever the CEO finds that a use existing as of the date of adoption of this
amendment (June 11, 2011), is located within a Wellhead Protection District designated
by this ordinance and poses an actual or potential threat to the safety or quality of a
public groundwater supply, the CEO shall inform the appropriate Water District
official. The CEO may request the municipal officers to authorize legal measures in
conjunction with the appropriate Water District to require the installation of monitoring
wells and testing. In cases where testing indicates that the use is found to cause or
contribute to reduction of eighty percent 80% or more of the State Primary Drinking
Water Standards at the Water District property line, the property owner shall reimburse
the town or Water District for all expenses incurred for installations, testing and
monitoring.
C.
Enforcement
If any contamination is found or reported within the Wellhead Protection District, the
CEO shall notify the Water District or Public Works Director along with any and all
appropriate State or Federal agency. The CEO will enforce this section in accordance
with Article 2 Section 2.05 of this ordinance.
Section 4.08 Adult Businesses
(Amended 06/5/1993).
1. The Planning Board may impose reasonable time, place, and manner restrictions on the
operation of so-called "Adult Businesses".
2. Planning Board review under this Ordinance shall be limited to the impacts and effects of
the proposed use as determined by applying the site plan review standards. The Planning
Board shall not deny approval for the proposed use on the basis of the content of the
materials sold, rented, exhibited or displayed and shall not restrict or limit the content of
such materials. Notwithstanding anything contrary in the Waterboro Zoning Ordinance,
Planning Board decisions under this Ordinance shall be appealed to the Waterboro Board of
Appeals.
3. No materials or devices displaying or exhibiting specified sexual activities shall be visible
from the exterior of the building in which the Adult Business is located.
48
4. No Adult Business shall be located in any location where the customer entrance to the adult
business would be closer than 1,000 feet, measured in a straight line without regard to
intervening structures or objects, to the nearest point on the boundary of any property which
1s:
a. occupied by a residence, school, park, playground, church or public building.
b. located in a residential zone.
c. occupied by another adult business.
Section 4.09 Special Requirements for Apartment Conversions
Apartment Conversions shall be subject to all applicable requirements of Article 2 Expansion of
the structure for conversion purposes shall be allowed only if the following criteria are met: 1) the
existing square footage of the house, accessory structure, and expansion will not cover in excess of
50% of the entire lot, and 2) the minimum lot size requirement is met. In reviewing the Apartment
Conversion, the Applicant must meet the following density requirements of each zoning district:
Density Requirements:
1 Unit
2 Units
3 Units
Village
40,000 sq. ft.
60,000 sq. ft.
80,000 sq. ft.
Residential
40,000 sq. ft.
60,000 sq. ft.
80,000 sq. ft.
Agricultural & Residential
80,000 sq. ft.
120,000 sq. ft.
160,000 sq. ft.
Forest & Agricultural
5 Acres
7.5 Acres
10 Acres
Section 4.10 Special Requirements for Office/Office Complex
The following performance standards shall be used by the Planning Board in reviewing
Office/Office Complexes.
Setbacks:
All applicable setbacks as outlined in each zoning district or Article 2, Section 2.08 must be met.
Building Height:
No structure shall be built or expanded to exceed the 35 ft. height restriction.
Density Requirements:
For the purpose of Office/Office Complex the following densities shall be defined as the "base lot"
in each described zoning district:
49
Village
Residential
Agriculture/Residential
20,000 sq. ft.
40,000 sq. ft.
80,000 sq. ft.
For the purposes of an Office/Office Complex, one or more professional offices will be allowed on
a base lot provided that all performance standards outlined in this section are met to the Planning
Board's satisfaction.
Hydrogeological Study:
An applicant must provide proof through a Hydrogeological Study that the proposed Office/Office
Complex meets the nitrate nitrogen concentration standards of no more than 5 mg/1 of nitrate
nitrogen at the property line of the proposed Office/Office Complex.
If a proposed project cannot meet these standards the applicant is provided two remedies:
a. Reduce the project scope to meet the nitrate nitrogen concentration standards; or
b. Increase the area of the base lot in 10,000 square foot increments until all
hydrogeological impacts are within Town of Waterboro guidelines and approved by the Planning
Board.
If sufficient proof is provided by the applicant that the project will not produce more than 5mg/l of
nitrate nitrogen, the Planning Board may waive the requirement for a hydrogeological study.
The Planning Board reserves the right to hire outside professionals to evaluate a proposal or design's
compliance with this Ordinance, with the expense of the review borne by the applicant. The
estimated cost of the consultant's fees shall be paid by the applicant to the Planning Board at the
time the conditional use application is viewed. The remaining balance due, if any, shall be paid
prior to the issuance of a conditional use permit for the office complex.
Maximum Lot Coverage:
The Applicant's proposed project shall not cover the lot by more than 50%. For the purpose of this
section, lot coverage shall be defined as the combination of all improvements contained on the lot
including:
a. Building (principal & accessory) footprint; and
b. Parking lot area; and
c. Septic System area.
Landscape Buffer:
The Planning Board may condition the project by allowing for a landscape buffer strip 15 feet in
width along the roadway.
50
The landscaped buffer strip shall be used and maintained only as a suitable planting area for lawns
with trees, shrubs or other landscape materials. The septic system and well construction within this
area shall be allowed if placed and constructed in conformance with all state regulations.
Section 4.11 Modifications for Special Structures
Provisions of this ordinance are permitted in circumstances which involve nonconformance (see
Article 8), planned unit development (see Section 7.01), cluster development (see Section 7.02),
otherwise unusable substandard lots (see Sections 2.08 and 8.05), and where the requirements for
the issuance of a variance are met (see Section 9.04). (Amended 06/24/2016).
In addition, height modifications which should usually not exceed a fifty (50) percent increase from
the otherwise applicable height limitations imposed by this ordinance or 52.5 feet may be allowed
by the Planning Board in the construction of either permitted or accessory structures which are by
their nature unique or special structures and required to obtain other approvals from the Planning
Board at the time the height differential request is made. Requests pursuant to this section of the
ordinance to exceed the height limitations in a particular district need not meet the more difficult
requirements for the issuances of a variance but must demonstrate that the proposed height is
necessary, reasonable, and will not result in harm to adjacent property owners or the public.
Whenever possible, the approval of a request to exceed the height limitations in a particular district
should be compensated for by increasing the setback requirements from all lot lines by that distance
which maintains the original height to setback relationship. As a general rule, the powers conferred
by this section should not be used frequently.
Unique or special structures which are covered by this section include but are not limited to:
-
architectural projections; spires, belfries, cupolas, domes, flues, chimneys, flagpoles, etc.
-
public and private utility facilities; water tanks and towers, gas or oil storage tanks,
telephone and electric transmission lines and towers, radio or television relay towers,
antennas, or aerials, civil defense, police or fire warning systems, etc.
-
agriculture structures; barns, silos, windmills, well drilling facilities, etc.
-
miscellaneous structures and facilities; rest, picnic or playground facilities, monuments,
pollution control equipment, observation towers, experimental or scientific equipment, etc.
-
essential public or semi-public buildings; municipal buildings, schools, hospitals, churches,
etc.
Nothing in this section shall be interpreted as allowing a special structure to be located in any
district other than one where it is a permitted primary or accessory structure.
Section 4.12 Commercial Design Standards
Purpose.
To protect, enhance and perpetuate the town's historic, cultural and architectural
heritage and to enhance the town's attraction to residents and visitors and to serve as a support and
stimulus to business and industry, construction of a new building or structure or addition to an
existing structure shall be of such design, form, proportion, mass, configuration, building material,
texture and location on a lot as to conform with the following guidelines as deemed practicable by
the Planning Board. In areas of the town where structures have little or no historic value (e.g.,
51
franchise architecture), new construction or renovations shall enhance the area rather than replicate
existing structures.
1.
Applicability.
These design standards apply to all new commercial buildings, structures in the Town of
Waterboro with properties that have frontage or access on Route(s) 202 & 5 and which
require Site Plan approval.
2.
Standards
1. Proposed buildings, improvements and additions shall not be stylized to the point
that the building or improvements are more an advertisement than an architectural
form.
2. Long or continuous facades do not provide visual interest. Facades shall be
articulated every 50 feet using varied designs, rooflines, materials and heights. The
front facade shall be designed to look like more than one building entrance when the
fas:ade is proposed to be greater than 50 feet in width
3. The relationship of the width of the building to the height of the front elevation shall
be visually compatible with buildings, structures and open spaces where it is visually
related. A proposed new building or structure shall break up uninteresting box-like
forms into smaller, varied masses comparable to a variety of form and massing
which are often elements essential to the character of the streetscape. A void single,
monolithic forms that are not relieved by variations in massing
4. The roof shape of a building shall be visually compatible with that of buildings to
which it is visually related. When no clear pattern exists, a roof pitch of 5/12 or
steeper shall be used, or the building should be designed so as to appear to have a
pitched roof. The design of the roofline or parapet wall shall screen any air
conditioning or other utilities placed on the roof on 3 sides most visible to the public.
5. Where mechanical equipment such as HVAC are located at ground level, appropriate
vegetative screening shall be used to hide the equipment while spaced to allow for
routine maintenance.
6. For trash receptacles located on the property, where possible, natural vegetative
screening and or stockade fencing shall be used to screen the containers from public
view.
Section 4.13 Mobile Vending
The purpose of mobile vending regulations is to ensure that mobile vendors provide a safe healthy
environment for both vendors and the public at large. It is important to ensure that mobile vendors
do not become permanent businesses which would have a competitive advantage on a full time
brick and mortar businesses. Mobile vendors shall comply with the State of Maine rules relating to
eating and shall comply with the following regulations:
1.
Mobile vendors shall be allowed to leave equipment, vehicle or trailer on site or
displayed, or left in public view in the location of business during nonbusiness hours
provided the site & location have been approved by the Code Enforcement Officer.
Parking on residential lots is not allowed.
52
2.
Permits are required from the Code Enforcement Office and are valid for a period not
to exceed sixty days. Copy of State of Maine food license required. The applicant shall
provide a plan showing the proposed location of the trailer/truck, parking for patrons
any seating areas if proposed.
3. Items and equipment associated with mobile vending operations shall not hinder vehicle
traffic, pedestrian traffic and shall not hinder access to or from the property.
4. The operator/owner shall have written permission from the property owner to locate the
vehicle or trailer on said property.
5. The operator/owner shall have available off-street parking for patrons.
6.
The operator/owner is responsible for allowing no paper, food or other wastes to
accumulate on site. Clean and sanitary trash receptacles are required. No trash shall be
left on site overnight.
7. The operator/owner is responsible for; safe source of electric power, potable water,
clean and sanitary equipment, clean and safe storage for food.
8.
All equipment used for the preparation of food shall be located in the vehicle or trailer.
9.
One sign identifying the vehicle or trailer is allowed.
10. Exterior seating is allowed when sufficient off-street parking is provided.
11. A violation will result in suspension of the permit and possible fines for the property
owner and/or the permit holder.
12. Hours of operation are limited to; 8 am to 10 pm Sunday through Thursday and 8 am
through 11 pm Friday and Saturday. Localized lighting affixed to the vehicle or trailer
for the purpose of food preparation and menu illumination is allowed.
13. One mobile vendor is allowed on any single lot at any given time.
14. Mobile vendors shall be a minimum of twenty (20) feet from abutting property.
15. If an applicant would like to have more than one vendor on any one property or wants
to establish a Food Truck Park then Site Plan approval under Section 2, 2.09 shall be
required to establish such a use.
Section 4.14 Alternate Energy Sources (AES) (4.14 - 4.14.04 Amended 10-5-2021).
The intent of this ordinance is to establish standards for any Alternate Energy Source to utilize
while seeking to establish such facilities in Waterboro. These standards apply to Solar facilities
proposed in the Town of Waterboro.
53
Section 4.14.01 Exempt AES
The following are exempt from this Article provided they meet all other requirements of this
Ordinance:
a.
Roof-mounted on any Single Family legally permitted residential accessory structure and
ground mounted in the back yard of the property and with a height of no more than 15 feet.
b.
Building integrated solar (i.e., shingle, hanging solar, canopy, etc.).
c.
Repair or replacement of array components that do not enlarge the area of the existing AES.
Section 4.14.02 Site Plan Review
All non-exempt AES must be approved by the Waterboro Planning Board through the Town of
Waterboro Site Plan Review and Conditional Use process. The following requirements are
additional to all other requirements of the zoning ordinance to be included in the Site Plan and
Conditional Use.
a.
A Site Plan stamped and certified by a Maine registered engineer and Maine Licensed
Surveyor.
b.
A decommissioning plan signed by the party responsible for decommissioning and the
landowner (if different) whose minimum requirements meet the standards in Section 3,
below. Such plan must be filed in the York County Registry of Deeds prior to the first
operation of the array.
c.
Revegetate any cleared areas with appropriate plantings that are native to the region
according to the approved Site Plan unless requested in writing by the owner of the real
estate to not revegetate due to plans for agricultural planting or other development subject to
site plan review by the planning board.
d.
Provide a cost estimate(s) for the Construction of the Array as well as for the
Decommissioning of the facility in order to establish a bond Letter of credit or other form of
surety for the town to hold during the construction process and for the life of the facility
toward the decommissioning aspect of the project.
Section 4.14.03 Abandonment & Decommissioning
a.
All said removal and decommissioning shall occur within Twelve (12) months of the
facility ceasing to operate.
b.
Abandonment will occur because of any of the following conditions unless the lessee or
owner of the facility or of the parcel notifies the Code Enforcement Officer of the intent to
maintain and reinstate the operation of the facility within 30 days of the following events:
1.
The land lease ends; or
2.
The system does not function for Twelve (12) months; or
3.
The system is damaged and will not be repaired or replaced.
4.
The developer shall provide a meter tied into the system and CMP pole at the street
to show that the system is live.
54
A notice of the intent to maintain and reinstate the operation of the facility shall be updated
every six months with a statement of the progress made towards that goal, delivered to the
code enforcement officer.
If the facility has not returned to operational condition within Six (6) months from the date
of the first notice of the intent to maintain and reinstate the operation of the facility the Code
Enforcement Officer shall find the facility has been abandoned unless there is documentable
evidence of significant progress and in the Code Enforcement Officer's opinion the
decommissioning is likely to be completed in a timely manner.
c.
Upon determination of abandonment based on the foregoing, the Code Enforcement Officer
shall notify the party ( or parties) responsible by certified mail or by hand delivery with
signed receipt that they must remove the facility and restore the site to its condition prior to
development within Twelve (12) months of notice by the Code Enforcement Officer. A copy
of the notice shall be forwarded by the Code Enforcement Officer to the Board of
Selectmen.
1. In the event the lessee or owner of the facility fails to remove the array and its
components as outlined above, the landowner shall remove the facility within 90 days of
notice by the Code Enforcement Officer.
2. In the event the landowner fails to remove the facility as stated above, the Town of
Waterboro shall have the facility removed at the expense of the landowner.
3. Any unpaid costs associated with the removal after one year ofremoval shall be
enforced as a tax lien placed on the real estate of the array site.
Section 4.14.04 General Standards for All AES
a.
AES legally constructed prior to the effective date of this Article shall not be required to
meet the requirements of this Article, unless they are proposing an expansion.
b.
Unless otherwise specified through a written contract or agreement, a copy of which is on
file with the Waterboro Code Enforcement Officer, the property owner ofrecord will be
presumed to be the responsible party for owning and maintaining the array.
c.
An AES shall not be constructed until the conditional use application has been approved by
the planning board and a building permit has been issued by the Code Enforcement Officer
and all time for appeal by others has expired during which no appeal has been filed.
d.
All AES shall be operated and located such that no disruptive electromagnetic interference
with signal transmission or reception is caused beyond the site. If it has been demonstrated
that the system is causing disruptive interference to the code enforcement officer beyond the
site, the system owner shall promptly eliminate the disruptive interference or cease operation
of the system.
55
e.
All on-site electrical wires or piping associated with the system shall be installed
underground to public-utility company transmission poles, towers and/or lines. This
standard may be waived by the planning board if the project terrain is determined to be
unsuitable for underground installation if certified by a Licensed Maine Electrical Engineer.
f.
The array site shall not display any permanent or temporary signs, writing, symbols, logos or
any graphic representation of any kind advertising the project or it's developer except
appropriate manufacturers or installer's identification, warning signs, or other legally
required signs.
g.
Array placement must be designed to minimize or negate any solar glare onto nearby
properties, active aircraft landing and takeoff zones or roadways.
h.
If lighting is provided at site, lighting shall be shielded and downcast such that the light does
not spill onto the adjacent parcel or into the night sky. Motion sensor control is required.
1.
Any point of potential contact of people or animals with generated electric current must be
secured.
J.
The boundaries of any array that border any road or any abutting lot shall consist of a
vegetated buffer the width of the required setback along that border in addition to any fence
that shall be erected, active vegetation should be used to satisfy these planting requirements
where possible. No vegetation or fence shall interfere with a required clear sight triangle at a
driveway or road intersection. Berms with vegetation are encouraged as a component of any
buffer.
k.
If electric storage batteries are included as part of any array system, they must be installed
according to all requirements set forth in the National Electric Code and State Fire Code
when in operation. When no longer in operation, the batteries shall be disposed of in
accordance with the laws and regulations of the State of Maine laws and regulations relating
to solid, special, or hazardous waste disposal.
1.
All projects shall have perimeter fencing which secures the site from unwanted intruders.
The fencing shall be placed a minimum of 8" off the ground to allow for the safe passage of
animals. The fencing shall be gated at the access point and have a Knox box located for
emergency access.
m. Access to the site and throughout the site shall be a minimum of 20' of travel way in width.
n.
Identified environmental features such as and not limited to wetlands or critical habitat on
the site shall maintain a 100' buffer between any impacts and the resource. If State or
Federal regulations require additional buffers then the most restrictive regulations shall
apply.
o.
Visual Impact analysis shall be provided for any project which will include:
1. Plan profile of sight lines from various locations around the facility.
2. Renderings of the facility from several locations around the neighboring region.
56
Section 4.15 Accessory Dwelling Unit
Accessory Dwelling Units are a permitted use in the residential districts, subject to the review of
the Code Enforcement Officer and adherence to the following standards:
1. The owners of the principal structure must reside on the property either in the principal
structure, or the Accessory Dwelling Unit.
2. The Accessory Dwelling Unit shall not be greater than 800 square feet of living area. The
minimum ADU size shall be 410 square feet.
3. The Accessory Dwelling Unit may be located either in the principal dwelling unit, attached
to the existing Dwelling Unit or as a separate structure. The Accessory Dwelling Unit may
share the septic system with the principal dwelling unit or provide a separate septic system
that meets the requirements of the State Subsurface Wastewater rules Title 30-A Section
3428. On site well may be shared with the principal dwelling unit or provide a separate well
for the accessory dwelling unit where public water is not available. Said new septic system
must only be used to service the proposed accessory dwelling unity and not for the purpose
of serving any other independent dwelling. Subject to the terms above, the septic system on
the property in question shall be functioning properly at the time of application for the
permit approval by the Code Enforcement Officer. In addition, the applicant must submit a
new HHE200 form as documentation that suitable soil exists on the property to be sued for
the septic system, repair, or replacement in the event of failure of the original system. If a
combined system is proposed the main system must demonstrate that it is functioning
properly prior to permitting the expansion for the ADU.
4. The parking requirements of the Waterboro Land Use Ordinance shall not be considered
when adding an accessory dwelling unit.
5. Proper ingress and egress shall be provided to the accessory unit.
6. An accessory dwelling unit which complies with the requirements of this subsection shall
not be considered an additional dwelling unit when calculating lot area per family under the
dimensional requirements of the ordinance.
7. Only one accessory dwelling unit shall be permitted on a lot.
8. The Town shall require an applicant to place a deed restriction on the main parcel and inter
into a consent agreement assuring the lot will not be split in the future separating the
dwelling unit and the ADU. Ownership of the ADU shall also remain in the same
ownership as the principal structure.
9. ADU's shall not be used as a short-term rental unit and must have a lease agreement for no
less than 6 consecutive months with the same party.
57
Section 4.16 Affordable Housing Developments & Density Allowances
A.
For rental housing, a development in which a household whose income does not
exceed 80% of the median income for the area as defined by the United States
Department of Housing and Urban Development under the United States Housing
Act of 1937, Public Law 75-412, 50 Stat. 888, Section 8, as amended, can afford a
majority of the units that the developer designates as affordable without spending
more than 30% of the household's monthly income on housing costs; and
B.
For owned housing, a development in which a household whose income does
not exceed 120% of the median income for the area as defined by the United States
Department of Housing and Urban Development under the United States Housing
Act of 1937, Public Law 75-412, 50 Stat. 888, Section 8, as amended, can afford a
majority of the units that the developer designates as affordable without spending
more than 30% of the household's monthly income on housing costs.
C.
Density requirements. A Waterboro shall allow an affordable housing
development where multifamily dwellings are allowed to have a dwelling unit
density of at least 2 1/2 times the base density that is otherwise allowed in in the
Village, General Purpose and Agriculture/Residential zones from 1066 Main street
north to the intersection of Route 5 and west on Route 5 to John Smith Way and
may not require more than 2 off-street parking spaces for every 3 units. The
development must be served by a public, special district or other centrally managed
water system and a public, special district or other comparable sewer system
provided 51 % of the units will be de3signated as affordable housing as defined in
4.16 A & B above. The development must comply with minimum lot size
requirements in accordance with Title 12, chapter 423- A, as applicable.
D.
Water and wastewater. The owner of the affordable housing development shall
provide written verification to the municipality that each unit of the housing
development is connected to adequate water and wastewater services before the
municipality may certify the development for occupancy. Written verification
under this subsection must include:
1.
If a housing unit is connected to a public, special district or other
comparable sewer system, proof of adequate service to support any
additional flow created by the unit and proof of payment for the
connection to the sewer system;
2.
If a housing unit is connected to a public, special district or other
centrally managed water system, proof of adequate service to support any
additional flow created by the unit, proof of payment for the connection
and the volume and supply of water required for the unit
E.
Subdivision requirements. This section may not be construed to exempt a
subdivider from the requirements for division of a tract, parcel ofland or residential
living unit.
58
Article 5 Traffic, Parking, Road Access
Section 5.01 Traffic Visibility and Screening
No fences, structures, trees, shrubbery, material, vehicles or any other construction shall be placed
or maintained even temporarily in any manner which impairs the visibility of the driver of any
vehicle which in traveling on any roadway in the town, public or private, approaches within fifty
(50) feet of the initial point of intersection with another public or private roadway.
With the exceptions noted in the preceding paragraph, all outside parking and loading areas serving
more than twenty (20) vehicles shall be screened from view by suitable landscaping materials--
evergreen shrubs or trees, fencing, walls, berms, or any combination thereof. Such vegetative
screening shall be at least four (4) feet high at the time of planting or fencing should be at least six
( 6) feet high.
All parking and loading areas including areas used for maneuvering and interior circulation, shall be
set back at least twenty-five (25) feet from the roadway on which they front; and will maintain at
least a ten (10) foot greenbelt on the side and rear property lines. (Amended 04/27/2002).
Section 5.02 Loading Area Requirements
On every lot on which commercial, industrial or institutional activities are proposed, extended or
enlarged, a loading area with access to a public or private roadway shall be provided to avoid the
loading, unloading or maneuvering of vehicles within the right-of-way of any public or private
roadway. A loading area must be of sufficient size and shape to permit vehicle turn around to
preclude the need for any vehicle to back out on to any roadway. All loading areas must have
sufficient overhead clearance to accommodate tractor-trailer size vehicles.
The minimum loading area requirement for commercial activities is one five hundred (500) sq. ft.
space for each two thousand five hundred (2500) sq. ft. or part thereof of commercial floor area.
The minimum loading area requirement for industrial or institutional activities is one five hundred
(500) sq. ft. space for each five thousand (5000) sq. ft. or part thereof of industrial or institutional
floor area.
Activities which contemplate the loading, unloading, storage, or repair of buses, trucks, cars, or
other vehicles must provide sufficient outside loading and storage space to accommodate the
maximum number of vehicles which the facility is capable of handling at any one time.
Section 5.03 Parking Area Requirements
In all districts and in connection with every permanent or temporary use of land or structures
permitted, extended or enlarged after the effective date of this ordinance, an adequate parking area
with access to a public or private roadway in accordance with the provisions of this ordinance shall
59
be provided on the same lot as the principal use or structure which gives rise to the need for parking
space. In no case shall any part of the road right-of-way be used in providing such parking area.
Except in the case of single and two-family dwellings, a single parking space, exclusive of the space
needed within a parking area for driveway, turnaround and traffic circulation purposes shall be at
least two hundred (200) sq. ft. A parking area must be of sufficient size and shape to permit vehicle
turn around to preclude the need for any vehicle to back out on to any roadway. All parking areas
must be graded and surfaced with compacted gravel or paving, so as to be properly drained and dust
free. Parking areas serving more than ten (10) vehicles must have the individual spaces and aisles
marked.
Parking spaces shall be provided according to the following schedule:
1.
2.
3.
4.
5.
6.
7.
Single family residences
Two family residences
Multi-family residences in excess
of two-family units
Hotels, motels, guest houses,
dormitories, boarding houses
Theater, churches, halls, funeral homes
Hospitals, rest & nursing homes, sanitarium
Medical, dental, veterinary or
other health care offices or clinics
2 spaces
4 spaces
11/2 spaces
per unit
(minimum 5
spaces)
1 space for
each
guest room
plus 1 space
for every 3
employees
1 space
for every
4 seating
spaces
1 space for
each 3 beds
plus 1 space
for every 3
employees
4 spaces for
each
professional
person plus 1
space for
every 3
employees
60
8.
Restaurants, bars, lounges, diners, cafes
1 space for
every 3 seats
plus 1 space
for every 3
employees
9.
Pre-school, Nursery and primary schools
1 space for
every 20
students plus
1 space for
every 3
employees
10.
Secondary and post-secondary schools
1 space for
every 4
students plus
1 space for
every 3
employees
11.
Retail shops and service store,
1 space for
( cleaners, barbers, repair shops)
every 200
sq. ft. of
store area
plus 1 space for
every 3
employees
12.
Wholesale, warehouse, manufacture,
5 spaces for
or processing facilities
visitors plus
1 space for
every 3
employees
13.
Financial institutions, business,
1 space for
government, or professional offices
every 200 sq.
ft. of
non-storage
floor area
plus 1 space
for every 3
employees
61
14.
Fraternal organizations, clubs and lodges
1 space for
every 100 sq.
ft. of
non-storage
floor area
15.
Garages and filling stations
1 space for
every 100
sq. ft. of
non-storage
work areas
plus 1 space
for every 3
employees
16.
Fair grounds, amusement parks,
1 space for
ballparks, or recreational facilities
every 4 seats
or 1 space for
every 500 sq.
ft.of
playing area
or non-
storage area
open to the
public,
whichever
requires the
greater
number of
parking spaces
17.
Drive-in facilities
10 spaces for
each teller,
servmg
window or
counter plus
1 space for
every 3
employees
18.
Marinas
1 space for
each boat
dock or
moormg space
plus 1 space
for every 3
employees
62
19.
Agriculture or forestry activities
(including farmstands)
3 spaces plus
1 space for
each piece of
vehicle
equipment
used in the
operation and
1 space for
every 3
employees
Uses, activities, or facilities which arguably fit within more than one of the above categories will be
considered in that category requiring the least number of parking spaces. Uses, activities or
facilities which combine several of the above undertakings must provide an average of the total of
the number of spaces which each undertaking on its own would require. Uses, activities, or
facilities not specifically listed shall be placed in that category above which the Planning Board
determines is most similar in character to the proposed undertaking.
Section 5.04 Roadway Access
No driveway shall be within fifty feet of any intersection of public or private roads. A loading or
parking area shall not have more than two (2) access driveways to an abutting roadway. Property
owners with driveways serving drive-in commercial enterprises or serving loading or parking areas
designed for more than fifty (50) vehicles shall provide appropriate entrance and exit signs, stop
signs at all points of egress from the loading or parking area, and may, if the Planning Board
determines that the volume of traffic requires it, be required to provide a driveway divider, an
adequate frontage road, an approach lane, or a turning lane to insure safe traffic flow on, onto, and
off of abutting public or private roadways.
Section 5.05 Reserved
63
Article 6 Signs
Section 6.01 General Requirements
All signs which are located, erected, moved, reconstructed, extended, enlarged or structurally
altered after the effective date of this ordinance must be in compliance with the provisions of this
ordinance though some signs are exempted from otherwise applicable permit requirements and
accompanying regulations. (see Section 6.02). Signs placed in or on the windows ofresidences,
stores, or other buildings are not regulated by this ordinance except that such signs may not be
animated, and they may not utilize flashing lighting.
No sign, (whether regulated or umegulated by this ordinance) may resemble, imitate, or
approximate the shape, size, form, or color of railroad or traffic signs, signals, or devices. No sign
may be positioned so as to prevent or block the free ingress to or egress from any door, window, or
fire escape or in a manner which confuses, impedes, or impairs traffic movement or visibility. No
sign, except publicly owned signs, may be placed upon, extend into, or over the right-of-way of any
public or private road.
The owner of the land upon which a sign is located is responsible for its safe construction,
installation, and maintenance. Unsafe damaged or deteriorated signs, signs in danger of falling, or
signs not in compliance with the provisions of this ordinance are in violation of this ordinance. The
Code Enforcement Officer shall order compliance with this ordinance which may include the repair,
or removal of such signs. If compliance with his/her order is not achieved within the time period
specified in the order, the Town in addition to the remedies provided in Sections 11.02 and 11.03
may repair or remove the violating sign and assess the costs to the landowner.
Signs lawfully existing on the effective date of this ordinance may be continued though not in
conformance with the provisions of this ordinance. However, such signs are nonconforming
structures and as such subject to the provisions of Article 9.
For purposes of this ordinance signs having two (2) back-to-back display faces shall count as only
one (1) sign and only one (1) face shall be used in determining its size.
Section 6.02 Signs Not Requiring a Permit
Signs which do not require a permit may not exceed twenty (20) sq. ft. in size nor, including their
supporting structure, may they exceed fifteen (15) feet in height. They are permitted in all of the
zoning districts created by this ordinance. There may not be more than a total of two (2) of any
such signs on any one lot or parcel of land. Except for official traffic control signs, they must
directly relate to activities or beliefs of, or information about the land itself or the owner or lessee of
the land upon which the signs are situated. Again excepting official traffic control signs, they must
64
comply with the general requirements for all signs contained in Section 6.01. Signs not requiring a
permit include:
1.
Signs containing the house number, house name, street address,
or name of the occupants of a house.
2.
Real estate signs advertising the sale or lease of the property.
3.
Business signs indicating the profession, home occupation, or
commercial activity of the landowner or lessee.
4.
Bulletin board or informational signs of public, charitable, or religious
institutions.
5.
Memorial signs or tablets, including historical markers.
6.
Official traffic control signs.
7.
Temporary signs indicating a sale, activity, or event being undertaken by
the landowner or lessee.
8.
Political signs.
9.
On-site informational signs giving persons coming to the property necessary
and useful information as to the location of parking areas, restrooms,
pick-up and delivery areas, etc.
10. Warning signs or signs prohibiting trespass or other activities. Such signs
may also exceed the above limit to two (2) per lot or parcel of land.
All of the above signs may be lighted indirectly or internally but only by non-flashing white light.
They may not be placed on the roof of any building nor may they be painted or affixed directly onto
a wall or the side of any structure. They may not be painted or affixed directly onto rocks or other
natural objects except that they may be attached or fastened to such objects in a manner that will not
injure them.
Section 6.03 Signs Requiring a Permit
All signs except those specifically exempted by the provisions of Sections 6.01 and 6.02 require a
permit including those signs enumerated in Section 6.02 which are either larger in size than or
exceed the number permitted by that section. A sign permit for purposes of this ordinance shall be
deemed a type or subcategory of building permit--as such it will be issued by the Code Enforcement
Officer subject to and in accordance with all of the provisions outlined in Sections 2.03 and 2.05. In
addition the following regulations apply to signs requiring a permit:
1. All of the general requirements for signs contained in Section 6.01.
2. No sign requiring a permit may be located in either the (FA) or (C) district.
65
3. No sign may exceed three hundred (300) sq. ft. in size nor may a sign including its
supporting structure exceed twenty-five (25) feet in height.
4. Animated signs and signs involving neon, white, colored, or flashing lighting must be
positioned in a manner which avoids confusion with, intrusion upon, or harm to persons or
activities situated on adjacent land.
5. An individual lot or parcel of land may not under the combined provisions of Sections
6.02 and 6.03 contain more than 4 signs, with the exception as to number noted in 6.02 (10), or a
total of three hundred forty (340) sq. ft. of sign space.
6. Notwithstanding any other provisions of this ordinance, in (V) (R) and (AR) districts
signs which exceed one hundred (100) sq. ft. in size and which are located along or so as to be
viewed from any public or private roadway must be at least five hundred (500) feet apart as
measured along the roadway.
7. No sign requiring a permit may be positioned along or so as to be viewed from any
waterway as a business attraction to boaters.
8. All signs requiring a permit pursuant to provisions of this ordinance must evidence
compliance with all state sign and billboard control statutes or regulations and must have
received any required state permits.
Section 6.04 Reserved
66
67
68
Article 7 Planned Unit Development and Cluster Development
Section 7.01 Planned Unit Development
Subsection 7.01.01 General
Planned unit developments involving residential, commercial, or industrial activities or
combinations of the above activities are permitted by this ordinance. All PUD's are Subdivisions
and require Site Plan review --as such they are subject to all of the requirements and approval
procedures of Article 2 except that the time provisions of Section 2. 09 are extended to sixty ( 60)
days. The type and location of a PUD is established by Sections 3.04-3.08 of this ordinance. A
PUD may not be undertaken on any parcel of land smaller than ten (10) acres in size and it must be
owned or under the control of a single developer or entity. A PUD may not increase the overall
density of development permitted in the particular district in which it is located and at a minimum it
must comply with the substantive provisions of Articles 4, 5 and 6. However, all layout and
dimensional, area requirements imposed by Article 3 or the town's regulations may not be altered.
Subsection 7.01.02 Purpose and Intent of PUD's - PUDs are intended:
-
to promote flexibility in design and to allow the combination and coordination of land uses,
architectural styles, and building types in a harmonious and integrated fashion.
-
to preserve to the greatest extent possible the existing landscape features and natural amenity
of an area.
-
to promote the efficient use of land, a reduction in the size of road and utility systems and
thus of development costs.
-
to provide more usable land, suitably located recreation facilities and other public and
common facilities that would otherwise be provided under conventional development
procedures.
-
to promote experimentation and diversity in development processes.
Subsection 7.01.03 Control of Common Space, Open Area, and Common Facilities
Common space, common facilities and open areas whether owned by the public through dedication
and acceptance or retained in private ownership ( or both) are essential and major elements of a PUD
which are related to affect the long-term value of the individual units in the development. The
Planning Board in reviewing a PUD may not accept proposed dedications of common space or open
area but shall refer such proposals for public ownership along with its recommendations to the
Selectmen. Though formal acceptance of land proposed to be dedicated may be deferred until all
project approvals have been obtained, the Board of Selectmen, within thirty (30) days of such a
referral, must indicate by a binding vote its intent to accept land proposed to be dedicated or its
refusal to accept such land.
Common space and open areas and any common facilities located on such which are retained in
private ownership must be held in a manner that legally binds the developer or an owner's
association to continuously and permanently have responsibility for operating, maintaining,
conserving, improving, and generally caring for these common spaces, open areas, and facilities. A
legally enforceable technique for financing these responsibilities must also be created and imposed
69
on the developer and/or subsequent owners or lessees of property within a PUD. The rights and
duties of all parties (including the Town of Waterboro) to enforce any and all agreements touching
upon these matters shall be established by covenants which if a PUD is approved shall be recorded
prior to the sale of lease of any property within a PUD.
A separate covenant enforceable by both the Town of Waterboro and subsequent owners or lessees
of property within a PUD, which permanently precludes the subsequent development of any and all
land which is denoted in a proposed PUD as common space or open area, shall also be recorded
prior to the sale or lease of any property within a PUD except that common facilities designed to be
located on such lands and contemplated in the original PUD proposal shall be permitted.
Subsection 7.01.04 Review and Approval
The Planning Board in the context of reviewing PUD proposals and in the interests of efficiency
shall simultaneously conduct the subdivision review required by 30-A, M.R.S.A. §§4401-4408,
locally adopted subdivision regulations and site plan review.
The Planning Board shall approve a proposed PUD if it finds that all of the requirements for a
Subdivision and Site Plan Review are met, if all of the substantive requirements set forth in this
section are met, if the outlined purposes for which PUD's are created are substantially met, and if
the provisions for dealing with common space, common facilities, and open areas are completely
adequate, protecting both present and future interests of the town and subsequent owners or lessees
of property within a PUD.
The Planning Board is specifically encouraged to utilize the bonding provisions authorized in
Section 11.04 of this ordinance to ensure compliance with plans, specifications, and conditions
upon which a PUD approval was sought and obtained.
Section 7.02 Cluster Development
The clustering of residential housing units is permitted by this ordinance. Clustered housing
developments are a conditional use in all zoning districts as such they are subject to all of the
requirements and approval procedures of Article 2 Section 2.10 and Subdivision review except that
the time provisions are extended to sixty (60) days. The clustering of housing units may be
undertaken on any size parcel of land which is owned or under the control of a single developer or
entity. The overall density of housing permitted in a particular district and at a minimum cluster
developments must comply with the substantive provisions of Articles 5 6, and 7 and the height
limitations imposed in each district. However, all layout and dimensional requirements imposed by
this ordinance or the town's subdivision regulations may not be altered unless the design meets the
overall density requirements of the zone in which the development is located.
Cluster developments are usually more limited in scale and scope than PUD's (see Subsection
7.01.02) All of the provisions for the control of common space, open space, and common facilities
in PUD's outlined in Subsection 7.01.03 shall apply to common space, open areas, and common
facilities created by clustering development. For purposes of this section, wherever the phrase PUD
appears in Subsection 7.01.03 the phrase "cluster development" shall be used instead. Finally, the
review and approval procedures and standards designed for PUD's and set forth in Subsection
70
7.01 .04 shall also apply to cluster developments. For purposes of this section, wherever the phrase
PUD appears in Subsection 7.01.04 the phrase "cluster development" shall be used instead.
Section 7.03 Reserved
71
Article 8 Nonconformance
72
Section 8.01 Existing Nonconforming Uses and Structures
This ordinance reflects the best judgment of the Town of Waterboro with respect to land use and is
designed to both guide and bind all development activities, uses of land, and the construction,
enlargement or renovation of all structures. However, those uses and structures, including
accessory uses and structures, which do not conform to the provisions of this ordinance but which
are in actual existence at the time of enactment of this ordinance, may be continued. But because
nonconformance is inconsistent with the intent and objective, the creation or expansion of
nonconforming activities is not encouraged.
A nonconforming use or activity which extends to only a portion of land in common ownership
shall not be extended to the whole parcel if the redesign or realignment of lots is possible and will
enable the activity to be undertaken in a conforming manner consistent with the provisions of this
ordinance.
An existing nonconforming use or structure may not be physically moved to an alternative location
where it will still be nonconforming. Relocations must be undertaken in a manner that conform to
the provisions of this ordinance. An existing nonconforming use or structure at a particular site may
not give way to an alternative activity which will also be nonconforming. Changes in the use of land
or structures must be in conformance with the provisions of this ordinance.
Section 8.02 Existing Uses and Structures Which Conform With This Ordinance
Uses of land or structures, which on the date of enactment of this ordinance are in compliance with
the provisions of this ordinance, may not subsequently be converted to uses which are not permitted
by the provisions of this ordinance subject only to the provisions in Section 2.07 dealing with uses
similar in character to permitted uses. Uses of land or structures, which on the date of enactment of
this ordinance conform with the provisions of this ordinance, may not be subsequently expanded in
a manner which gives rise to nonconformance unless such nonconformity is minor and meets all of
the requirements for Section 2.08 and Article 8. (Amended 06/24/2016).
Section 8.03 Replacement and Maintenance
A nonconforming use or structure which is damaged by fire, explosion, flood, or other natural
disaster or act of God may be rebuilt or repaired provided the restoration is completed within one
(1) year and does not entail an expansion of the nonconforming use or structure.
Nothing in this ordinance precludes the normal upkeep and maintenance of nonconforming uses and
structures such as repairs, renovations, or modernizations which do not involve expansion of the
nonconforming use or structure; and such other changes in a nonconforming use or structure as
federal, state, or local building and safety codes may require.
73
Section 8.04 Abolishment and Transfer
A nonconforming use of land or structure permitted pursuant to the provisions of Section 8.01 may
not be resumed if such use is abandoned or discontinues in actual fact for a period of twelve ( 12)
months. In either circumstance the renewed use of such land or structure must be in conformance
with the provisions of this ordinance. When and if a nonconforming use of land or structures is
converted by the landowner or lessee to a permitted or conforming use of the land or structures, the
former nonconforming activities may not thereafter be resumed.
The owner of property which is nonconforming by virtue of the enactment and provisions of this
ordinance may nonetheless sell, lease, or otherwise grant the property including the nonconforming
use rights created in Section 8.01 to any person subject only to the conveying laws of the State of
Maine and, of course the limitations on nonconformance imposed by this ordinance.
Section 8.05 Existing Nonconforming Lots and Pending Applications for Building Permits
Two or more contiguous lots of record in common ownership at the time or since adoption or
amendment of this ordinance shall be combined and treated as a single lot or parcel of land. If the
dimensional or area requirements of the district in which the combined parcel is situated are not
met, development shall be in conformance with the provisions of this ordinance. (Amended
04/26/2003).
Nonconforming use rights cannot arise by the mere filing of a notice of intent to build, an
application for required building permits, or an application for required state permits and approvals.
Such rights arise only when actual construction has begun. Such construction must be legal at the
time it is commenced and must be in possession of and in compliance with all validly issued
permits, both state and local.
Section 8.06 Nuisance
State law provides in 30-A, M.R.S.A. §4302 that "Any property or use existing in violation of any
municipal land use ordinance or regulation is a nuisance." (Amended 05/13/2016). Nonconforming
uses and activities which violate the provisions of this ordinance particularly Article 8, may pose
unique problems and threaten both public and private interests. Accordingly, the Town of
Waterboro in addition to the enforcement mechanisms available to it pursuant to Sections 11 . 02
andl 1.03 of this ordinance may utilize any statutory provisions facilitating the abatement of
nuisances or in the alternative the town may acquire such nuisances for purposes of demolition by
either purchase or condemnation.
Section 8.07 Reserved
74
75
76
Article 9 Zoning Board of Appeals
Section 9.01 Establishment
Pursuant to the provisions of 30-A, M.R.S.A. §§2691 and 4353, a Zoning Board of Appeals is
established for the Town of Waterboro to receive, hear, and decide appeals from interpretations of
this ordinance and decisions of the code enforcement officer (see Sections 1.06 and 2.05), the
Planning Board (see Sections 1.06 and 10.04), and all requests for variances within the limitations
established by 30-A, M.R.S.A. §4353(4). (Amended 05/13/2016; 06/24/2016
Section 9.02 Membership and Organization
The Board shall consist of (5) five members appointed by the Board of Selectmen of the Town of
Waterboro to serve staggered five (5) year terms. Neither a Selectmen nor his/her spouse may be a
member of the Board. A member of the Board may be dismissed for cause by the Board of
Selectmen before the expiration of his/her term. The Board shall elect annually a chairman and a
secretary from its membership. Any questions of whether a particular issue involves a conflict of
interest sufficient to disqualify a member from voting thereon shall be decided by a majority vote of
the members, not including the member who is being challenged. (see 30-A, M.R.S.A. §2691).
(Amended 05/13/2016).
Section 9.03 Procedure
The chairman shall call meetings of the Board to deal with Board business and pending appeals or
requests for variances as necessary. The chairman shall also call meetings of the Board when
requested to do so by a majority of the Board of Selectmen. A quorum of the Board necessary to
conduct an official meeting shall consist of at least three (3) members. Official action may be taken
by a majority of those members present and voting on any issue but no motion receiving fewer than
two (2) votes shall be deemed passed. The chairman shall preside at all meetings of the Board and
be the official spokesman of the Board. The Code Enforcement Officer shall be present at all
meetings and hearings of the Board to provide such information and technical assistance as the
Board may require.
The secretary shall maintain a permanent record of all Board meetings and all correspondence of the
Board. The secretary shall be responsible for maintaining those records which are required as part
of the proceedings which are brought before the Board. All records to be maintained or prepared by
the secretary are deemed public, shall be filed in the Municipal Clerk's Office and may be inspected
at reasonable times.
The Board may provide by rule, which shall be recorded by the secretary for any matter relating to
the conduct of any hearing, provided that any rule may be waived by the chairman upon good cause
shown.
The Board shall conduct a de novo review of the matter under appeal and may receive any oral
and/or documentary evidence pertaining to a matter before it; but shall provide as a matter of policy
for the exclusion of irrelevant, immaterial or unduly repetitious evidence. Every party shall have the
right to present his/her case or defense by oral and/or documentary evidence, to submit rebuttal
77
evidence and to conduct such cross-examination as may be required for a full and true disclosure of
facts.
The Appellant or their Agent shall be present at their hearings pertaining to their Administrative
Appeal or Variance Request. Failing to be present can be a reason for denial of Administrative
Appeal or Variance Request. (Amended 03/12/1988).
The transcript of testimony, if any, and exhibits, together with all papers and requests filed in any
appeal or variance proceeding shall constitute the record. All decisions shall become a part of the
record and shall include a statement of findings and conclusions, as well as the reasons or basis
therefore. The absence, abstention, or vote of each Board member shall be appended to the record
of all appeal proceedings and variance requests. (See 30-A, M.R.S.A. §2691). (Amended
05/13/2016).
Section 9.04 Duties
The Board shall receive, hear, and decide all requests for variances (see Section 2.03). A variance
shall be granted or denied within sixty ( 60) days of receipt of a completed request. A variance may
be granted by the Board only where strict application of this ordinance, or local subdivision
regulations to the applicant's property would cause undue hardship as defined by state law, 30-A
M.R.S.A., §4353 (Amended 05/13/2016)
9.04.01 Variances for Undue Hardship. Except as provided in Section 9.04.2, a variance shall
be granted by the Board only where strict application of this ordinance, or local subdivision
regulations to the applicant's property would cause undue hardship as defined by state law
30-A, M.R.S.A. §4353 (4) (Amended 05/13/2016) pursuant to the following:
1. The land in question cannot yield a reasonable return unless a variance is granted; and
2. The need for a variance is due to the unique circumstances of the property and not to the
general conditions in the neighborhood; and
3. The granting of a variance will not alter the essential character of the locality; and
4. The hardship is not the result of action taken by the applicant or prior owner.
9.04.02 Variances from Dimensional Requirements. The Board may grant a variance from
the dimensional requirements imposed by this ordinance when strict application of the ordinance
to the applicant and the applicant's property would cause a practical difficulty and when the
following conditions exist:
1. The need for a variance is due to the unique circumstances of the property and not to the
general condition of the neighborhood; and
2. The granting of a variance will not produce an undesirable change in the character of the
neighborhood and will not unreasonably detrimentally affect the use or market value of
abutting properties; and
3. The practical difficulty is not the result of action taken by the applicant or a prior owner;
and
4. No other feasible alternative to a variance is available to the applicant; and
5. The granting of a variance will not unreasonably adversely affect the natural environment;
and
78
6. The property is not located in whole or in part within the shoreland area as described in 38
M.R.S.A. §435.
As used in this subsection 9.04.2, "dimensional standards" means and is limited to ordinance
provisions relating to lot area, lot coverage, frontage and setback requirements.
As used in this subsection 9.04.2, "practical difficulty" means that the strict application of the
ordinance to the property precludes the ability of the applicant to pursue a use permitted in the
zoning district in which the property is located and results in significant economic injury to the
applicant.
-
9.04.03 Additional Variance Standards.
1. Before a variance may be issued, the Board must determine, in addition to its finding of
undue hardship or practical difficulty, that the granting of a variance would not negatively
impact the best interest of the community. (Amended 03/10/1990).
2. Undue hardship shall not be construed to include: self-imposed hardships; an inability to
realize as great an economic gain as would be possible if the variance were granted; or a
hardship that is not unique to the applicant's land.
3. A variance, if granted, should necessitate only a slight departure from the stated requirements
of an ordinance, usually not exceeding a fifteen (15) percent increase or decrease from the
stated requirements.
4. A variance, if granted, must not subvert the intent of the Town's Comprehensive Plan, this
ordinance or local subdivision regulations as manifested in the language of the Plan or the
particular provisions from which the variance is sought.
5. A variance, if granted, must not have a harmful effect on the use of nearby land and
structures insofar as that land is being used in conformity with state and local land use
ordinances and regulations. The Board in granting a variance may attach appropriate
conditions which will avoid harm to adjacent property owners and the public.
Section 9.05 Hearing and Parties
All Board meetings at which appeals or requests for variances are heard, considered and decided are
public hearing (see Section 9.03). Notice of a public hearing shall be given at least seven (7) days
prior to the hearing date by general advertisement to the public. At least ten (10) days prior to the
date set for the Zoning Board of Appeals hearing on an appeal or a variance application, the Zoning
Board of Appeals shall cause written notice, by certified mail, of that hearing to (a) all property
owners ofrecord whose land abuts the property and the property directly across private way, State,
or Town Roads for which the variance is requested; (b) the person making the appeal; (c) the
Planning Board; ( d) the Code Enforcement Officer and ( e) any other parties of record to the
proceedings. The owners of property shall be considered to be those shown on the property tax lists
of the Town. Failure of any abutting property owner to receive notice shall not necessitate another
hearing or invalidate the action of the Board. The mailed and published notices shall include the
following information: (1) The name of the applicant; (2) A brief description of the property
involved; (3) A brief statement of the nature and extent of the variance requested; (5) The time and
place of the Board's hearing on the variance. (Amended 03/12/1988).
79
All of the general meeting and voting rules outlined in Sections 10.02 and 10.03 shall apply to
Zoning Board of Appeals meetings (public hearings) conducted pursuant to this section of the
ordinance.
Section 9.06 Findings
The denial of an appeal or of a variance request must include the reasons therefor--the failure to
meet the requirements of this ordinance or state statutory requirements (see 30-A, M.R.S.A. §4353
(Amended 05/13/2016)) or such other reasons as the Board may set forth in its statement of findings
and conclusions (see Section 10.03). The sustaining of an appeal or the granting of a variance must
also include a statement of findings and conclusions which must specifically indicate all of the
requirements of this ordinance as well as state statutory requirements have been met. When
conditions are attached to the granting of a variance the need for and the underlying rationale of the
attached conditions must be set forth.
Section 9.07 Decisions
A copy of Board decisions on all appeals and variance requests shall be mailed or hand delivered to
the appellant, the applicant, the Planning Board, the Code Enforcement Officer, and the Board of
Selectmen within seven (7) days. A copy which will provide notice to the public shall also be
placed on file and available for inspection in the Town Clerk's office.
A variance which has been granted shall expire six ( 6) months from the granting date unless
substantial work ( actual construction) in reliance upon it has commenced. Work commenced must
normally be completed within two (2) years. A variance shall not be valid for a longer period of
time but may be reissued for an additional two (2) year period if the nature of the project requires
additional time and if work on the project has been continuous.
Section 9.08 Judicial Review
A request and hearing for reconsideration may be made to the Zoning Board of Appeals by an
aggrieved party in accordance with 30-A, M.R.S.A. §2691. Such request must be made in writing
and filed within 10 days of the decision that is to be reconsidered. A vote to reconsider and the
action taken on that reconsideration must occur and be completed within 45 days of the date of the
vote on the original decision. The Board may conduct additional hearings and receive additional
evidence and testimony on the reconsideration.
An appeal may be taken, within forty five ( 45) days after a Zoning Board of Appeals decision is
rendered, by an aggrieved party to Superior Court from any final order, relief or denial in
accordance with 30-A, M.R.S.A. §2691 and with Maine Rules of Civil Procedure, Rule 80B, except
that an appeal from a reconsideration shall be made within fifteen (15) days after the decision on
reconsideration, or as otherwise established by 30-A, M.R.S.A. § 2691.
(Amended 04/27/2002;
05/13/2016).
80
Section 9.09 Reserved
81
82
Article 10 Planning Board
Section 10.01 General
In addition to the duties conferred to the Planning Board by the Town of Waterboro acting pursuant
to 30-A, M.R.S.A. §4351 or the Home Rule Powers (see Section 1.01), the provisions of this
ordinance impose responsibilities on the Board which are essential to the effective implementation
and carrying out of the intent and purpose of the ordinance. These include:
1. Reviewing and deciding with the Board of Selectmen whether to permit or not allow uses
presently not permitted by this ordinance but which are similar in character to uses which
are permitted. See Section 2.07.
2. Reviewing and deciding whether to permit or not allow a temporary use and if allowed the
extent, scope, and conditions (if any) of the temporary use. See Section 2.07.
3. Reviewing and ultimately approving or disapproving applications to permit a conditional
use.
4. Reviewing and ultimately approving or disapproving proposed departures from the height
requirements of this ordinance necessitated by the unique or special characteristics of the
structure. See Section 4.11.
5. Reviewing and ultimately approving or disapproving applications to undertake a planned
unit development or cluster development. See Sections 7.02 and 7.01;
6. Reviewing and forwarding a recommendation to the Board of Selectmen as to whether
common space and open area which a developer contemplates dedicating to the town as part
of a PUD or cluster development proposal should be accepted. See Subsection 7.02.03 and
Section 7.03.
7. Conducting a PUD or cluster development and subdivision review. See Subsection 7.02 and
Section 7.01.
8. Reviewing and ultimately deciding whether particular developers will be required to post
performance bonds to insure compliance with the provisions of this ordinance and the plans,
specifications, or conditions upon which required approvals and permits were sought and
obtained. See Section 11.04
9. Reviewing and ultimately approving or disapproving applications for site plan review. See
the Town of Waterboro Site Plan Review Ordinance. (Amended 04/27/2002).
10. Reviewing and ultimately approving or disapproving applications for subdivision review as
set forth in the Town of Waterboro Land Subdivision Regulations and 30-A, M.R.S.A. §§
4401-4408.
Finally the Planning Board shall be required no less frequently than every three (3) years to review
this ordinance in light of new data and changing conditions within and outside of the town and to
propose those amendments or refinements pursuant to the provisions of Section 1.08 which will
enable this ordinance to continue to be an effective device for carrying out the Town's
Comprehensive Plan and the stated intent and purpose of the ordinance (see Sec. 1.02 & 1.03).
83
Sectionl 0.02 Hearings
The Planning Board may hold a hearing, in addition to those specifically required by provisions of
this ordinance and State statute, to facilitate carrying out any of its responsibilities as outlined in
Section 10.01. The Board shall follow the procedures set forth in Section 10.01.
Section 10.03 Findings and Decisions
All decisions of the Planning Board must be predicated on testimony received by the Board at
hearings, planning data which it has gathered and which is available to the public, other facts, data,
or information which are a matter of public record and information obtained from the applicant.
When taking any final action the Board must issue a statement of its findings and conclusions which
sets forth the reasons for and the rationale underlying the particular Board action. Board actions
which are generally favorable to an applicant must specifically indicate that all of the requirements
of state statute and this ordinance have been met. Board actions which are unfavorable to an
applicant must specifically indicate how and in what way the applicant failed to comply with the
requirements of state statute or this ordinance. When conditions are attached to any Board approval
the factors establishing the need for and justifying the condition as framed must be indicated. A
copy of all final board actions (decisions) shall be mailed, e-mailed or made available in the town
hall to the party who requested the Board actions, the Code Enforcement Officer, and the Board of
Selectmen within ten (10) working days. A copy which will provide notice to the public shall also
be placed on file and be available for inspection in the Town Clerk's office.
Section 10.04 Review
Before judicial review may be sought pursuant to the provisions of Section 1.06, any decision, final
action or failure to act of the Planning Board, must be appealed within thirty (30) days to the Zoning
Board of Appeals of the Town of Waterboro by the applicant or an aggrieved party. The Zoning
Board of Appeals may affirm the Planning Board, remand the issue with instructions which it had
taken, or the Zoning Board of Appeals may modify Planning Board actions for reasons which must
be set forth. (Amended 04/26/2003).
84
Section 10.05 Reserved
85
86
87
Article 11 Violations, Enforcement
Section 11.01 Violations, Fines
Persons who have not adhered to the provisions of State law, this ordinance, other local land use
ordinances or regulations, or the plans, specifications, or conditions upon which required permits
and approvals were sought and obtained are in violation of this ordinance. Violations shall be noted
initially by the Code Enforcement Officer's issuance of a code enforcement order (see Section 2.05).
Such orders are to be complied with immediately.
A violation which consists of the commencement of development activity or the use of land, water,
or structures without applying for or before obtaining all of the permits and approvals which this
ordinance requires will also subject the violator to the payment of fees double in amount to those
established in the fee portion of the town's regulations. Violators who have not applied for required
permits and approvals must do so.
Section 11.02 Board of Selectmen Orders, Enforcement
The Board of Selectmen, acting upon the recommendation of the Code Enforcement Officer,
Planning Board, or the Zoning Board of Appeals, may protect the public interest and the reasonable
expectations of private landowners by ordering violators to cease and/ to remove any violating
activity, use or structure and; if necessary, it may order the restoration of conditions in existence
prior to the violation.
If fees or double fees are not paid or if a Code Enforcement Order, or an order of the Board of
Selectmen is not complied with, the town may bring whatever legal, equitable, or injunctive action
is necessary to compel the payment of established fees and to seek the imposition of appropriate
fines as well as compliance with its orders, as well as all remedies provided for by 30-A, M.R.S.A.
§ 4452. The costs of such proceedings shall also be imposed on the violator.
Section 11.03 Performance Guarantee: Value, Requirements and Conditions
a. A subdivider or applicant for site plan or other review requiring Planning Board approval
shall file with the Planning Board at the time of approval of the final plan, a draft
performance guarantee in the amount of one hundred and twenty-five percent (125%) of the
estimated value of the required subdivision or site plan improvements. No work shall be
undertaken, and no building permits shall be issued, until the final performance guarantee is
provided to the Town.
b. The performance guarantee shall be tendered in the form of a faithful performance bond, a
letter of credit or a certified check running to the Town and issued by a bank or surety
company acceptable to the Town of Waterboro.
c. The conditions and amount of such a performance guarantee shall be determined by the
Planning Board, with the recommendation of the Town Planner, Public Works Director and
consulting engineer as needed.
d. The amount shall be equal to 125% of the total cost of furnishing, installing, connecting and
completing all of the street grading, storm drainage, site improvements and public water
infrastructure (as required). Additionally, if a cistem(s) is installed a mutually-agreed upon
88
maintenance bond or other acceptable financial guarantee will be mandated as a condition of
final approval.
e. Performance guarantees shall be in effect for the duration of the secured project and until
such time as the subject improvements have been proven complete and effective, as
determined by the Planning Board.
f.
The maximum time period for the performance guarantee will be for a period of three (3)
years beginning on the date of final approval by the Board. The Planning Board may
approve a performance guarantee of a shorter duration upon evidence provided by the
applicant that the shorter guarantee is appropriate.
g. When the Planning Board has approved a performance guarantee in the form of a certified
check, the Town Treasurer shall deposit the same in a segregated account.
h. The proceeds of the performance guarantee shall be used to finish the improvements
indicated on the approved plan if the subdivider fails to complete those improvements within
the specified time frame.
1.
A performance guarantee may be reduced after review and approval by the Planning Board,
subject to the following:
1. A reduction may be allowed by the Planning Board, provided that substantial
improvements have been completed and inspected.
2. The reduction in performance bonding shall be requested in writing by the applicant.
Such a request shall be accompanied by a listing of subdivision/infrastructure
improvements still to be completed and quoted estimates of the cost(s) for their
completion.
3. The Town consulting engineer shall provide an opinion of the remaining work and
estimated costs to determine the amount of the reduction. (Amended 01/17/2012)
Section 11.04 Release of obligation required by performance guarantee.
a. Before the release of a performance guarantee, the developer shall request, in
writing, that the Planning Board release the performance bond. This request shall
include evidence that all the required improvements have been completed. The
evidence shall include "as built" plans of the project.
b. The Planning Board shall request certification from the peer review engineer that all
required or proposed improvements have been satisfactorily completed and the "as
built" plans are submitted. (Amended 01/17/2012)
Section 11.05 Extension of performance guarantee period.
a. The Planning Board may grant an extension of up to 12 months to the performance
guarantee when the developer can demonstrate to the satisfaction of the Planning
Board good cause for such extension. Any extension shall require a new cost
analysis for remaining site improvements and may require that the amount of the
guarantee be increased if the Planning Board determines that the cost of the
improvements has increased beyond the amount of the existing guarantee.
(Amended 01/17/2012)
89
Section 11.06 Record Management and Performance Guarantee Facilitation.
a. The Town shall maintain a record management system relating to subdivisions and
site plan review projects that have performance guarantees. A logging system of
project/owners names, location, start and expiration dates of performance/surety
bonds and amounts of bonds shall be maintained. Quarterly reports on the status of
pending bonds shall be sent to the Town Administrator, Planning Board, Code
Enforcement Officer, Board of Selectmen, and Town Treasurer. In the case of
cistern maintenance guarantees, the Fire Chief shall receive copies of all
communications concerning the maintenance guarantee. (Amended O 1/17/2012)
90
Section 11.07 Reserved
91
ARTICLE 12 Definitions
Section 12.01 General
-
The word "person" includes a firm, association, organization, partnership, trust, company or
corporation as well as an individual or any legal entity.
-
The word "shall" is mandatory, and the word "may" is permissive.
-
The word "lot" includes the words "plot" and "parcel".
Section 12.02 Words and Terms Defined
Abutter: The owner of any property within 500 feet of the property line.
Accessory Dwelling Unit: A separate dwelling unit that has been added on, or created within, a
single-family house or a separate standalone structure for the purpose of providing living
accommodations accessory to the primary residence.
Accessory use or structure: A use or structure necessary, customary, incidental, and subordinate to
a permitted use or structure and located on the same lot or parcel as the permitted use or structure,
accessory uses, when aggregated, shall not subordinate the principal use of the lot.
Adult Business: Any business, a substantial or significant portion of which consists of selling,
renting, leasing, exhibiting, displaying or otherwise dealing in materials or devices of any kind
which appeal to prurient interests and which depict or describe specified sexual activities. Thirty
percent of the active display area is considered significant or substantial.
Adult day care center: a program of care and activities licenses by the State of Maine, carried out
on a regular basis in a private dwelling or other facility, for a fee, for any part of the day, for three
or more adults, nineteen years of age or older, who are not blood relatives. Type 1 facility
accommodates five or fewer clients. Type 2 facility accommodates more than five clients.
Affordable Housing: Decent, safe, and sanitary dwelling units that can be afforded by households
in the following two categories:
A. For rental housing, a development in which a household whose income does not
exceed 80% of the median income for the area as defined by the United States
Department of Housing and Urban Development under the United States Housing
Act of 1937, Public Law 75-412, 50 Stat. 888, Section 8 as amended, can afford a
majority of the units that the developer designates as affordable without spending
more than 30% of the household's monthly income on housing costs; and
B. For owned housing, a development in which a household whose income does not
exceed 120% of the median income for the area as defined by the United States
Department of Housing and Urban Development under the United States Housing
Act of 1937, Public Law 75-412, 50 Stat. 888, Section 8, as amended, can afford a
majority of the units that the developer designates as affordable without spending
more than 30% of the household's monthly income on housing costs.
92
Agent: anyone having written authorization signed by the property owner to act on behalf of that
property owner.
Aggrieved Person: An owner of land whose property is directly affected by the granting or denial
of a permit or variance: a person whose land abuts land for which a permit or variance has been
granted; or any person or group of persons who have suffered particularized injury as a result of the
granting or denial of such permit or variance.
Agricultural related business use:_a business that provides goods and /or services, a substantial
portion of the market for which is agricultural or other natural resources businesses including uses
such as farm equipment dealers, feed and grain stores and similar uses.
Agriculture: the production, keeping or maintenance for sale or lease, of plants, including, but not
limited to: forages and sod crops, grains and seed crops, fruits and vegetables, and ornamental
products, and unless expressly prohibited, the keeping of livestock, including dairy animals and
dairy products, poultry and poultry products, cattle and cattle products or horses. Agriculture does
not include forest management and timber harvesting activities or medical marijuana.
Alteration: Any change, addition, demolition, extension, or renovation of a structure. In the
case of land it involves the clearing, filling, grading, replanting, and/or recontouring of the
natural landscape.
Altered Structure: a change in either the intensity of use, such as the addition of bathrooms,
kitchens, bedrooms, or other habitable spaces, or a conversion from seasonal to year round use.
Alternative tower structure: a _non-tower mounting structure such as a clock tower, bell steeple,
light pole, water tower, or other structure upon which an antenna may be mounted, and which
camouflages or conceals the presence of the antenna.
Animal husbandry: the growing and/or raising of livestock and/or poultry for commercial
purposes.
Antenna: any system of poles, panels, rods, reflecting discs or similar devices used for the
transmission or reception of radio or electromagnetic frequency signals.
Apartment conversions: The conversion of an existing dwelling and/or accessory
building to the dwelling into a total of no more than three units per lot for lots existing prior to
the adoption of this subsection (6/4/94). For the purposes of the section, the conversion of a
structure shall mean the division of the existing structure into individual dwelling units.
Appeal: In the context of this ordinance, it is a procedure whereby an aggrieved person may
have the benefit of having the actions of the Code Enforcement Officer or Planning Board,
reviewed to determine their validity by the Zoning Board of Appeals. Actions of the latter body
may then be reviewed by the Superior Court.
93
Aquaculture: The growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species. (Amended 6/4/94)
Aquifer: A permeable geologic formation, either rock or sediment, that when saturated with
groundwater is capable of transporting water through the formation. (Amended 8/23/11 by
Selectmen vote)
Automobile dealer: an establishment engaged primarily in the retail sale of automobiles and/or
trucks and may include repair, service and the sale of parts, but does not include body repair or
body painting.
Automobile graveyard: a yard, field, or other outdoor area used to store 3 or more unregistered or
uninspected motor vehicles. This also includes an area used for automobile dismantling, salvage
and recycling operations as further defined in 30-A, M.R.S.A. § 3752.
Average depth of lot: If an existing lot of record does not comply with the minimum lot size
requirements of the zone which it is located, average depth of lot shall be determined by the
requirements in Section 2.08.
Bar: a business, not meeting the definition of restaurant, where alcoholic drinks are sold for
consumption on the premises; including meeting halls of nonprofit organizations if they are licensed
to serve alcoholic beverages.
Bed-and-Breakfast: any residential structure in which rooms are offered and rented to the public
for periods of time typically less than thirty (30) days, but not more than thirty (30) days, and in
which one meal per day is available only to the people renting the rooms. The building must also
be occupied by the resident manager or property owner.
Best management practices: Procedures designed to minimize the impact of certain activities or
land uses on groundwater quality and quantity, and shall include best management practices relating
to groundwater quality as developed by the State of Maine Departments of Agriculture,
Environmental Protection, Forestry, Transportation and Development pursuant to 38 M.R.S.A., §
420-C. (Amended 8/23/11 by Selectmen vote)
Boarding kennels: any place, building, tract of land, abode wherein or whereon privately owned
dogs or other pets, or both, are kept for their owners in return for a fee. Included shall be the
temporary keeping of animals for grooming purposes in return for a fee.
Building: Any structure having a roof, partial roof, or canopy supported by poles, columns, or
walls used or intended to be used for the shelter or enclosure of persons, animals, or things
regardless of the material of which it is constructed.
Building height: the vertical distance between the highest point of the roof and the average grade
of the ground adjoining the building.
Building Permit An official document or certificate issued by the Code Enforcement Office that
authorizes performance of a specified activity. Any owner or authorized agent who intends to
94
construct, enlarge, alter, repair, move, demolish or change the use of a building or structure shall
first make application to the Building Official and obtain the required permit(s).
Bulk Oil, Gasoline Storage, Cement Mixing, & General Construction Facilities:
Bulk Fuel Oil, Gasoline Storage, Cement Mixing General Construction Tanks, Trucks,
equipment and facilities. Notwithstanding any provision of this ordinance to the contrary, all of
the above uses must be on parcels not less than five (5) acres in size. (Amended 6/5/93)
Business services: a commercial activity which renders an actual service such as cleaning,
repairing or consulting and which involves no retail sales upon the premises.
Camp: A structure equipped and used for seasonal and/or recreational living quarters and being
complete with adequate sanitary facilities conforming to the State Plumbing Code.
Camping, wilderness/primitive: camping in a forest with no developed facilities and leaving the
site with little or no evidence of human visitation. Lands designated for primitive camping are
usually in areas with difficult access. No facilities are provided. Primitive camping is a remote
camping experience in a forested setting, with evidence of human activity ranging from recreational
trails to past logging activity, to remnants of the land's past use.
Campground: A public or private enterprise which for a fee provides overnight camping
facilities in cottages or shelters or space for tents or recreational vehicles. It also provides
restroom, washroom and shower facilities; and usually provide recreational areas and activities.
camping supplies; outdoor campfire and cooking facilities; etc.
Change of use: A switch to a different kind, type, or class of activity in the use of land or
structures (for example, a retail store changing to a wholesale outlet--agricultural land put to use
for residential structures) as opposed to a mere change in the size or intensity of given use or a
change within a given type or class of activity (for example, a small store becoming a large store-
-a dairy farm which is now used for general farming or crop production).
Clearcutting: The felling of all trees in a continuous area at one time.
Clearing: The removal of naturally occurring objects, materials, trees or other vegetation.
Cluster development: A development controlled by a single developer on any size parcel of land
which contemplates an imaginative more compact grouping of residential housing units. Cluster
developments are usually undertaken in a manner that treats the developed area as an entirety to
promote flexibility in design, architectural diversity, the efficient use of land including the creation
of common open space, a reduction in the size of road and utility systems, and the retention of the
natural characteristics of the land. Cluster development may not be used, however, to increase the
overall density of development
Code Enforcement Officer: A person acting on the direction of the Town Administrator and
pursuant to the provisions of this ordinance charged with issuing building and occupancy permits
and enforcing the provisions of this ordinance and State law by the issuance of code enforcement
orders to any person violating the ordinance. The term Code Enforcement Officer shall include
Building Inspector, Building Official, Plumbing Inspector and Health officer.
95
Commercial animal husbandry: The keeping of more than 5 animals for re-sale of products.
Commercial breeding: Breeding, raising, and care of dogs, cats, mink, rabbits, and other
domesticated or fur bearing animals for commercial purposes. (Amended 6/5/93)
Commercial use: The use of lands, buildings, or structures, other than a "home
occupation", defined below, the intent and result of which activity is the production of income
from the buying and selling of goods and/or services, exclusively of rental or residential buildings
and/or dwelling units. (Amended 5/13/04)
Common space: An area within a planned unit development or cluster development intended
for the use and enjoyment of subsequent owners of property within the development. It is
created by the grouping of structures in one portion of the total area to be retained in its natural
state or developed for wood lot, gardening, or outdoor recreational uses.
Conditional use: A permitted use, but one which by its nature in a particular zoning district
requires case by case determination_by the_Planning Board under Site plan Review to assure
compliance with the provisions of this ordinance and avoidance of harm to public or private
interests.
Conforming use or structure: A use or structure which is in existence at the time a zoning
ordinance is enacted or which is built or undertaken after enactment, which complies in all
respects with the provisions of the enacted zoning ordinance.
Contractor business: A business that provides building construction or similar services on a
contract basis at a client's site and in which all material or equipment storage at the place of
business is contained within a building or other screened area.
Cul-de-sac: A type of non-through street; one that does not connect with other segments of a public
and/or private road network but ends in a connected circle.
Day care facility: A house or other place in which a person maintains or otherwise
carries out a regular program, for consideration, for any part of a day providing care and
protection for 3 or more children under 13 years of age. The term "Day Care Facility" does not
include any facility operated as a nursery school, a home day care provider, a summer camp
established solely for recreational and educational purposes, or a formal public or private school.
(Amended 4/27 /02)
De novo hearing: It affords an appellant the opportunity to offer additional evidence during the
appeal even if it is information that was not presented to the Planning Board. This becomes
essential in cases where the administrative record of the local proceedings is sparse.
Developed area: "Disturbed area" (see definition below) excluding areas that are returned to a
condition with the same drainage patterns and vegetative cover type that existed prior to the
disturbance. An area is not considered developed if planting to restore the previous cover type
and restoration of any altered drainage patterns occur within one calendar year of the
disturbance. (Amended 8/23/11 by Selectmen vote)
96
Developer: Any person, including a governmental body undertaking to use or develop any
land or water area.
Development: The carrying out of any building or mineral extractive activity or the making of
any material change in the use or appearance of any structure or land and the subdividing of land,
including: The reconstruction, alteration of the size, or any other material change in the external
appearance of a structure or land; a change in the intensity of use of land such as an increase in
the number of dwellings units, offices, or businesses in a structure or on land; alteration of a
shore, bank, or the bottom of any waterbody; commencement of drilling, mining, or excavation
of materials; demolition of a structure; clearing of land in the context of site preparation; deposit
of refuse or fill material on a parcel of land.
Disturbed area: All land areas that are stripped, graded, grubbed, filled or excavated at any
time during the site preparation or removing vegetation for or construction of a project.
Disturbed area does not include routine maintenance, but does include re-development and new
impervious area. (Amended 8/23/11 by Selectmen vote)
Drive-in facility: A store, eating establishment, or business institution which by design and
physical arrangement primarily serves its patrons in parked automobiles_or through an order/pickup
window.
Dwelling:_ One or more rooms arranged for complete, independent housekeeping purposes with
space for eating, living, and sleeping; facilities for cooking; and provisions for sanitation. (2009
NFPA 101/3.3.61)
Family: One or more persons occupying a dwelling and living as a single housekeeping unit.
Such unit shall not exceed five persons not related by blood, adoption, or marriage.
Farming: A tract of land used for growing or cultivation of produce or crops, the propagation or
raising of livestock or poultry, tree farms similar to Christmas trees. Farming does not include
timber harvesting, growing and/or processing and/or selling marijuana.
Farm, animal: A parcel of land that contains at least the following land area used for the keeping
of horses, mules, cows, goats, sheep, hogs and similar sized animals for the domestic use of the
residents of the parcel, provided that adequate land area is provided for each animal unit, excluding
water bodies of one-quarter acre surface area or larger.
(1) Cattle: one bovine animal unit per acre of cleared hay-pasture.
(2) Horse: 2 animal units per acre of cleared hay-pasture land.
(3) Sheep: three animal units per acre of cleared hay-pasture land.
(4) Swine: two animal units per acre of cleared land.
(5) Animal farms not mentioned here will be determined by the municipal officer charged with
enforcement and shall conform to the lot size for similar sized animals.
Farmers market: The outdoor display and sale of locally grown farm products which may involve
one or more vendors displaying and selling products.
Farm stand: The seasonal, incidental sale of fresh fruits, vegetable, nursery plants and farm
products which were produced on the premises or other land in the same control as the farm stand.
97
Footprint: The entire area of ground covered by the structure(s) on a premises, including
cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios and
decks.
Foundation: Any base material that provides frost protection for habitable space.
Foundation Certification: Any base for a habitable structure requires a licensed surveyor to locate
and produce a document verifying setbacks and location on said lot.
Flea market: A shop or open market customarily involving table or space rented to vendors
selling antiques, used and new household goods, curios, and the like. For the purpose of this
ordinance, any Yard/Garage Sales conducted for more than 3 days during a week's time period
shall be defined as a Flea Market. "Flea Markets" as distinguished from Yard & Garage Sales,
must require a Conditional Use Permit in all districts. (Amended 6/5/93)
Frontage: That portion of a lot or parcel of land abutting a public or private right-of-way or a
waterbody.
Front yard setback: The minimum horizontal distance from the edge of a public or private
right-of-way to the nearest part of a structure. (Amended 6/4/94)
Gas station, service station: Any place of business at which gasoline, other motor fuels,
motor oil or vehicle maintenance services are sold to the public for use in motor vehicles.
Great pond: Any inland body of water which in a natural state has a surface area in excess of
ten acres.
Greenbelt: For the purpose of these regulations, a "greenbelt" is defined as a strip of land
vegetated with grass or other plant life maintained as open green space. Removal of dead trees,
mowing of grass and pruning of other vegetation, to the extent appropriate for routine
maintenance, are the only cutting permitted within a greenbelt area. The only construction
permitted within a greenbelt is that necessarily related to the exercise or use of a utility easement
and/or that necessarily related to a driveway. If another means of access to the property other
than through the greenbelt is available, construction related to utility easements shall be the only
permissible construction within the greenbelt boundaries. (Amended 4/27 /02)
Hammerhead turn-out: A gravel area built entirely outside of the right of way a minimum
of 75' sq. for the purpose of vehicular maneuvering. The area of the right of way adjacent to the
hammerhead tum must consist of a 75' x 50' gravel area. The right of way must extend 75' beyond
the hammerhead tum with a graveled area of 7 5' x 3 5'. The right- of- way with a hammerhead tum
shall be built in compliance with the sketch to be provided by the Code Enforcement Office.
(Amended 3/11/00)
Hazardous material: Any gaseous, liquid or solid materials or substances designated as
hazardous by the Environmental Protection Agency and/or the Maine Department of
Environmental Protection. (Amended 8/23/11 by Selectmen vote)
98
Hazardous waste: A waste substance or material, in any physical state, designated hazardous by
the Maine Board of Environmental Protection pursuant to Title 38, M.R.S.A. Chapter 13. It does not
include waste resulting from normal household activities.
Home day care provider: A person who receives some type of payment to provide
childcare in his or her own home on a regular basis, for 3 to 12 children under 13 years old, who
are not the provider's own children. (Amended 4/27/02)
Home occupation: A home occupation must conform to the standards set forth in Section 4.05 of
this ordinance. (Amended 3/8/97) An occupation or profession, carried on for monetary gain, which
is carried on in a dwelling unit or structure accessory to a dwelling unit, is clearly incidental and
secondary to the use of the dwelling unit for residential purposes, does not employ more than three
persons who are not related, by blood or marriage to the business owner, or who does not reside on
the premises. Home occupation shall not include motor vehicle related sales and service operations.
No more than twenty five percent of the floor space in any residential building may be given over to
a home occupation or office.
Horticultural activities: Activities including but not limited to Nurseries, Greenhouses, and
Commercial Sale of such products. (Amended 6/5/93)
Impervious area: The total area of a parcel that consists of buildings and associated
constructed facilities or areas that will be covered with a low-permeability material, such as
asphalt or concrete, and areas such as gravel roads and unpaved parking areas that will be
compacted through design or use to reduce permeability. (Amended 8/23/11 by Selectmen vote)
Indoor recreation: Recreational Facilities including Bowling Alleys, Skating Rinks,
Swimming Pools, etc. (Amended 6/5/93)
Industrial The assembling, fabrication, finishing, manufacturing, packaging or processing
of goods, or the extraction of minerals. (Amended 5/13/04)
Intensive uses: Uses of open space which have the potential, because of their
duration, frequency, or nature, to significantly impact the environment, particularly the
groundwater quality and quantity. Examples of intensive open space uses include: automobile or
all-terrain vehicle racetracks or ranges. (Amended 8/23/11 by Selectmen vote)
Junkyards: A lot or parcel of land and/or a structure or a part of either, used for the purchase,
collection, storage, recycling, or sale of wastewater, rags, scrap metal, or other discarded goods,
materials, machinery, or vehicles. Said areas must not be located within five hundred (500) ft. of
any residence, camp, or water body and must be appropriately screened. (Amended 6/5/93)
Kennels: Any place, building, tract of land, abode, enclosure, or vehicle which, for compensation,
provides food and shelter for dogs for purposes not primarily related to medical care, or engages in
the breeding of more than two female dogs for the sale of their offspring.
Loading area: An obstructed area no part of which is located in or on any public or private
right-of-way and the principal use of which is for the standing, loading, unloading, and
maneuvering of vehicles.
99
Lot: A tract ofland having frontage on a public or private right-of-way occupied or intended to
be occupied by permitted use or structure and accessory uses and structures together with such open
spaces, yards, parking areas, etc. as are required and recorded in the York County Registry of
Deeds.
Marina: A facility on or adjacent to the water which is available for mooring or berthing of five or
more vessels and with provisions for the following: boat storage, boat launching, mooring, and the
sale of fuel, supplies and services for watercraft and their equipment and accessories.
Marsh: A periodically wet or continually flooded land area with the surface not deeply
submerged, covered predominantly with sedges, cattails, rushes or other hydrophilic plants.
Manufactured housing unit: Structures, transportable in one or two sections, which were
constructed in a manufacturing facility and are transported to a building site and designed to be
used as dwellings when connected to the required utilities, including the plumbing, heating, air
conditioning, and electrical systems contained therein. (Amended 9/25/90)
Medical marijuana grow only facility: A facility that engages only in the
growing and processing medical marijuana in accordance with State law, but does not
dispense marijuana. Processing of medical marijuana may include, but is not limited to, the
preparation of tinctures, ointments, and food products containing medical marijuana. Medical
Marijuana Grow-Only facilities shall require a conditional use application as set forth in Article
2 and must be located on Route 5 or Route 202 in the General Purpose and Agriculture and
Residential (AR) Zones. (Amended 2/22/11 by Selectmen vote)
Mining or mineral extraction: The removal of geologic materials such as soil, topsoil,
loam, sand, gravel, clay, metallic, ores, rock, peat, or other like material from its natural location
and transportation of the product removed away from the extraction site. (Amended 8/23/11 by
Selectmen vote)
Mobile Home Park: A parcel of land under unified ownership designed and/or used to
accommodate three or more manufactured housing units. (Amended 9/25/90)
Mobile home: see Title 30-A, M.R.S.A.§ 4358.
Mobile Vendor: a motorized vehicle or pull behind trailer used for selling prepared foods,
farm vegetables, flowers or other similar grown products, crafts.
Mobile Vending Food Truck Park: when 2 or more mobile vendors want to co-exist on the same
parcel for a time period of no less than 1 day and no more than 180 days in any calendar year.
Modular home: see Title 30-A, M.R.S.A. §4358.
M.U.B.E.C. Maine Uniform Building and Energy Code.
Multi-family dwelling unit: A dwelling designed for occupancy by two or more families.
100
Legal nonconforming structure or use : A legal structure or use including accessory uses or
structures already in existence or begun before the date of enactment of a zoning ordinance or
amendment, which structure or use does not comply with the existing provisions of the zoning
ordinance or amendment.
Nuisance: Any property or use existing in violation of any zoning ordinance that creates
unreasonable interference with the right, common to the general public or unreasonable interference
with a particular person's use and enjoyment of his or her land. Collection of trash, garbage,
plastics, metals, un-registered boats and/or un-registered recreational vehicles, fences that are
constructed with material that is not of typical or standard design or that are not maintained in good
repair or appearance.
Nutrient Management Plan (NMP): A plan developed in accordance with 7MRS Chapter 747,
which identifies all sources of plant nutrients generated or utilized on a farm and specifies
appropriate application rates, setbacks from sensitive features and application methods, as defined
by the Maine Department of Agriculture, Conservation, and Forestry.
Occupancy permit: A certificate to be secured from the Code Enforcement Officer prior to
commencing actual use of a land area or structure evidencing that permitted activities specified
in a building permit have been completed in accordance with the provisions of this ordinance.
Office/office complex: A building (new or existing) wherein services are performed
involving predominantly administrative professional or clerical operations. Complex may
consist of one or more professional offices. Examples of professional office include but are not
limited to Banks, Insurance Brokers, Real Estate Brokers, Lawyers, Accountants, Doctors, and
Dentists. (Amended 6/4/94)
Parking area: An unobstructed area consisting of one or more 200 sq. ft. parking spaces no
part of which is located in or on any public or private right-of-way and the principal use of which
is the temporary storing and maneuvering of vehicles.
Pesticide, herbicide, petroleum bulk storage: Storage of herbicides and/or pesticides and/or
petroleum intended for sale or distribution.
"PUD", Planned Unit Development: In the context of this ordinance a development controlled by
a single developer on a tract ten (10) acres or larger in size.
Primary uses and structures: Permitted uses and structures which in each zoning
districts are recognized as most highly compatible with existing development, the capacity of the
land area to support further development, and the objectives of the comprehensive plan and this
ordinance. (Note: some primary uses may also require site plan and/or subdivision review).
Principal Structure: Any building or structure in which the main use of the premises takes place.
Professional Office: A structure or space which houses the business office of a person or persons
who supply a professional service other than a business service, financial service, or personal
service, as defined in this ordinance.
101
Processing Facilities Related to Agriculture or Wild Game: Any structure, machine, device or
system, or combination thereof, designed and operated for the purpose of making food, animal feed,
feed supplement, or furs from animal carcasses or parts, as defined by the Maine Department of
Agriculture, Conservation, and Forestry (DACF) and meeting standards as established by DACF.
Public facility: A building owned, operated or funded in whole or in part by the Town of
Waterboro which members of the general public have occasion to visit, either regularly or
occasionally, such as, but not limited to, the Town Hall, the Public Library, the Police Station
and Fire Stations. (Amended 6/5/93)
Public utility: Utility or Communications poles, towers, lines, and unmanned substations,
etc. (Amended 6/5/93)
Recreational vehicle or camper: A vehicle, or an attachment to a vehicle designed to be towed and
designed for temporary sleeping or living quarters for one or more persons, and which may include
a pick-up camper, travel trailer, tent trailer, camp trailer and motor home, RV. In order to be
considered as a vehicle and not as a structure, the unit must remain with its tires on the ground and
must be legally registered with the State Division of Motor Vehicles.
Resource extraction: Extraction of rock, sand and gravel.
Restaurant, Lounge & Cafes: A place, the primary use of which is to prepare and serve food and
beverages to the public for compensation, in a form ready for consumption within the premises.
Restaurants, Lounges & Cafes I: Restaurants, Lounges, Cafes with less than one thousand
(1,000) sq. ft. of customer service area.
Restaurants, Lounges & Cafes 11: Restaurants, Lounges, Cafes with more than one
thousand (1,000) sq. ft. of customer service area.
Retail shop: A store or shop engaged in the sale of commodities or goods or a service to individual
customers for personal use. Marijuana sales and/or distribution and/or production and/or use is not
included in this definition.
Retail & Service Stores I: All types of Retail Shops and Stores with less than one thousand
(1,000) sq. ft. of Store area.
Retail & Service Stores II: All types of retail and service stores (Repair Shops Barbers,
Beauticians, Cleaners, etc.) with more than one thousand (1,000) sq. ft. of Store area.
Road or roadway: A public or private right-of-way intended to be used for the passage of
persons and vehicles.
Seasonal Use: A use which is undertaken and naturally associated with a given time of the year as
opposed to a use capable of being and usually undertaken on a year-round basis.
102
Setback: The minimum horizontal distance from a lot line, or the side of a right-of-way easement or
deeded right-of-way (see Section 3.03) to the nearest point of
a structure. (Amended 3/11/00)
Signs: Any words, letters, figures, numerals, phrases, sentences, emblems, designs, names, trade
names or marks, affixed to, painted, or carved directly or indirectly upon a building, structure, or
other material for purposes of informing or attracting the attention of the public.
Solar Array: A solar panel, or photo-voltaic module, is an assembly of photo-voltaic cells
mounted in a framework for installation. Solar panels use sunlight as a source of energy and
generate direct current electricity. A collection of PV modules is called a PV Panel, and a system of
Panels is an Array.
Solid waste: Discarded solid material with insufficient liquid content to be free flowing. This
includes but is not limited to rubbish, garbage, scrap materials, junk, refuse, inert fill materials
and landscape refuse. (Amended 8/23/11 by Selectmen vote)
Special or unique structure: A structure (such as an electric transmission line tower) or
part of a structure (such as a church spire) which is allowed to exceed the otherwise applicable
height limitations of this ordinance in situations where the added height is necessary, reasonable,
and will not harm the public. Increased structure height should be offset by requiring additional
setback from all lot lines.
Structure: A man- made construction or assemblage of materials having a
temporary or permanent location on ground or water such as, but not limited to, buildings, towers,
masts, poles, booms, signs, sheds, carports, tents, equipment and machinery (including mobile
homes and recreational vehicles when stationery). Tents intended for sleeping should not be
considered a structure and therefore do not have to meet setback requirements. (Amended 6/16/98)
Substantial work: (actual construction) The point at which the planning and site preparation phase
of a project gives way to actual construction.,_
Temporary use or structure: A use or structure not permitted by this ordinance but
allowed to be undertaken for brief periods of time.
Timber harvesting: The cutting, trimming, stacking and removal of trees from their growing
site including the operation of cutting and skidding equipment.
Utilities: Include gas, electricity and water supply systems; radio, television, telephone and
other communications systems; bus, truck and fuel distribution systems; solid and wastewater
disposal systems. Such systems include but not limited to lines, cables, poles, towers, pipes,
drains, sewers, treatment plants, hydrants, signals, antennas, distribution facilities, substations,
offices, buildings, vehicles, etc.
Utility Corridor: Right-of-way, easement, or other corridor for transmission wires, pipes or
other facilities, for conveying energy.
103
Variance: A departure from the literal or strict application of the dimensional
requirements of this ordinance which may be granted in circumstances where undue hardship
would otherwise result, but only if the requirements of 30-A, M.R.S.A.§4353.
Wellhead: The specific location of a well (a hole or shaft dug or drilled to obtain water) and/or
any structure built over or extending from a well. (Amended 8/23/11 by Selectmen vote)
Wellhead Protection District: A zone, consisting of 2 districts, delineated according to Article 3
Section 3.01 and 3.02 of this ordinance. (Amended 8/23/11 by Selectmen vote)
Wild Game: animals not domesticated, but found in the wild in their natural habitat, and harvested
for food, furs, recreation, or trophies.
Yard and Garage Sale: The occasional selling, offering for sale, trading, swapping, or
otherwise bartering used or second-hand household goods from any residential premises.
There shall be no limit as to the number of Yard and Garage Sales a person has during the year.
Yard and Garage sales can be conducted on a residential premise for no more than 3 days during a
week time period. At no time shall the proposed Yard and Garage Sale inhibit the flow of traffic.
Persons holding a sale must provide sufficient parking so that all vehicles attracted to the sale are
not parked within the right-of-way. (Amended 6/5/93)
Section 12.03 Reserved
104