Proposed Amendment to the SHORELAND ZONING ORDINANCE originally enacted in 2004
and amended in 2008
Amend the current ordinance by repealing:
e Section 14. Table of Land Uses, Column 3 (Forest management activities except for timber
harvesting) and Column 4 (Timber harvesting):
e Section 15 (O) including 15(O-1) in its entirety; and
e Section 17. Definitions, the definitions of "forest management activities" and "residual basal
area".
Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
Add the following paragraphs to Section 4:
Sections 15(O) and 15(O-1). Section 15(O) is repealed on the statutory date established under 38 M.R.S.A. section 438-A(5), at
which time Section 15(0-1) shall become effective. Until such time as Section 15(O) is repealed, Section 15(O-1) is not in effect.
Section 14, Table 1. Items 3, 4 and 27 are repealed on the statutory date established under 38 M.R.S.A. section 438-A(5), at
which time Section 15(O-1) shall become effective. Until such time as Table i, Items 3; 4 and 27 are repealed they shall remain
in effect. ;
Section 17._ The following definitions are repealed on the statutory date established under 38 M.R.S.A. section 438-A(5), at
which time Section 15(O-1) shall become effective. '
' Cross-sectional area, DBH, Disruption of shoreline integrity, Forest management activities,
Forest stand, Harvest area, Land management road, Licensed forester, Residual basal area,
Residual stand, Skid road or skid trail, Slash, Timber harvesting, Timber harvesting and
related activities, and Wind firm
Until such time as the above definitions are repealed they shall remain in effect.
NOTE: The statutory date established under 38 M.R.S.A. section 438-A(5) is the effective date of state-wide timber harvesting
standards. That date is "the first day of January of the 2nd year following the year in which the Commissioner of Conservation
determines that at least 252 of the 336 municipalities identified by the Commissioner of Conservation as the municipalities with
the highest acreage of timber harvesting activity on an annual basis for the period 1992-2003 have either accepted the state-
wide standards or have adopted an ordinance identical to the state-wide standards." 38 M.R.S.A. section 438-A (5) further
provides that "the Commissioner of Conservation shall notify the Secretary of State in writing and advise the Secretary of the
effective date of the state-wide standards."
Add the following to Section 15: :
Q-1. Timber Harvesting -- Statewide Standards [Effective on effective date established in Section 4(B)]
(1) Shoreline integrity and sedimentation. Persons conducting timber _ harvesting and related activities must take
reasonable measures to avoid the disruption of shoreline integrity, the occurrence of sedimentation of water, and the
disturbance of water body and tributary stream banks, water body and tributary stream channels, shorelines, and soil lying
within water bodies, tributary streams and wetlands. If, despite such precautions, the disruption of shoreline integrity,
sedimentation of water, or the disturbance of water body and tributary stream banks, water body and tributary stream
channels, shorelines, and soil lying within water bodies, tributary streams and wetlands occurs, such conditions must be
corrected. ,
(2) Slash treatment. Timber harvesting and related activities shall be conducted such that slash or debris is not left below
the normal high-water line of any water body or tributary stream, or the upland edge of a wetland. Section 15(Q-1)(2)
does not apply to minor, incidental amounts of slash that result from timber harvesting and related activities otherwise
conducted in compliance with this section.
, (a) Slash actively used to protect soil from disturbance by equipment or to stabilize exposed soil, may be left in place,
provided that no part thereof extends more than 4 feet above the ground.
(b) Adjacent to great ponds, rivers and wetlands:
Page 1 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
* Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
(i) No accumulation of slash shall be left within 50 feet, horizontal distance, of the normal high-water line or
' upland edge of a wetland; and
j (ii)_ Between 50 feet and 250 feet, horizontal distance, of the normal high-water line or upland edge of a
wetland, all slash larger than 3 inches in diameter must be disposed of in such a manner that no part thereof
extends more than 4 feet above the ground.
(3) Timber harvesting and related activities must leave adequate tree cover and shall be conducted so that a well-
distributed stand of trees is retained. This requirement may be satisfied by following one of the following three options:
(a) Option 1 (40% volume removal), as follows:
(i) Harvesting of no more than 40 percent of the total volume on each acre of trees 4.5 inches DBH or greater in
any 10 year period is allowed. Volume may be considered to be equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including existing ground cover,
must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers, streams, and great ponds, and
within 75 feet, horizontal distance, of the upland edge of a freshwater or coastal wetlands, there must be no
cleared openings. At distances
greater than 75 feet, horizontal distance, of the normal high-water line of a river or great pond or upland edge of
a wetland, timber harvesting and related activities must not create single cleared openings greater than 14,000
square feet in the forest
canopy. Where such openings exceed 10,000 square feet, they must be at least 100 feet, horizontal distance,
apart. Such cleared openings will be included in the calculation of total volume removal. Volume may be
considered equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of at least 60 square feet per acre of woody vegetation
greater than or equal to 1.0 inch DBH, of which 40 square feet per acre must be greater than or equal to 4.5
inches DBH;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including existing ground cover,
must be maintained; and,
(iii)Within 75 feet, horizontal distance, of the normal high-water line of water bodies and within 75 feet,
horizontal distance, of the upland edge of wetlands, there must be no cleared openings, At distances greater
than 75 feet, horizontal distance, of the normal high-water line of a river or great pond, or upland edge of a
wetland, timber harvesting and related activities must not create single cleared openings greater than 14,000
square feet in the forest canopy. Where such Openings exceed 10,000 square feet, they must be at least 100
feet, horizontal distance, apart. Such cleared openings will be included in the calculation of the average basal
area. Volume may be considered equivalent to basal area.
{c) Option 3 (Outcome based), which requires: An alternative method proposed _in an application, signed by a
Licensed Forester or certified wildlife professional, submitted by the landowner or designated agent to the State of
Maine Department of Conservation's Bureau of Forestry (Bureau) for review and approval, which provides equal or
better protection of the shoreland area than this rule.
Page 2 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
Landowners _must_designate_on the Forest Operations Notification form required by 12 M.R.S.A.chapter 805, .
subchapter 5 which option they choose to use. If landowners choose Option 1 or Option 2, compliance will be
determined solely on the criteria for the option chosen. If landowners choose Option 3, timber harvesting and
related activities may not begin until the
Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is retained through a field
procedure that uses sample plots that are located randomly or systematically to provide a fair representation of the
harvest area.
(4) Skid trails, yards, and equipment operation. This requirement applies to the construction, maintenance, and use of skid
trails and yards in shoreland areas.
(a) Equipment used in timber harvesting and related activities shall not use river, stream or tributary stream channels
as travel routes except when surface waters are frozen and snow covered, and the activity will not result in any
round disturbance.
(b) Skid trails and yards must be designed and constructed to prevent sediment and concentrated water runoff from
entering a water body, tributary stream, or wetland. Upon termination of their use, skid trails and yards must be
stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet, horizontal distance, of any
water body, tributary stream, or wetland. On slopes of 10 percent or greater, the setback for equipment
operation must be increased by 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for ,
each 5 percent increase in slope above 10 percent. Where slopes fall away from the resource, no increase in the
25-foot setback is required.
(ii) Where such setbacks are impracticable, appropriate techniques shall be used to avoid sedimentation of the
water body, tributary stream or wetland. Such techniques may include the installation of sump holes or settling
basins, and/or the effective use of additional ditch relief culverts and ditch water turnouts placed to avoid
-sedimentation of the water body, tributary stream, or wetland. If, despite such precautions, sedimentation or
the disruption of shoreline integrity occurs, such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to crossings of water bodies, tributary
stream channels, and freshwater wetlands, ditches and other related structures, must be designed, constructed, and
maintained to prevent sediment and concentrated water runoff from directly entering the water body, tributary stream or
wetland. Surface water on or adjacent to water crossing approaches must be diverted through vegetative filter strips to
avoid sedimentation of the watercourse or wetland. Because roadside ditches may not extend to the resource being
crossed, vegetative filter strips must be established in accordance with the setback requirements in Section 15(O-1)(7) of
this rule. ,
(a) Land management roads and associated ditches, excavation, and fill must be set back at least:
(i) 100 feet, horizontal distance, from the normal high-water line of a great pond, river or freshwater or coastal
wetland;
(ii) 50 feet, horizontal distance, from the normal high-water line of streams; and ;
Page 3 of 8
AtruecopyAttest.
Town Clerk, West Paris, Maine
Améndments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
: (iii) 25 feet, horizontal distance, from the normal high-water line of tributary streams
f (b) The minimum 100 foot setback specified in Section 15(O-1)(5)(a)(i) above may be reduced to no less than 50 feet,
horizontal distance, and the 50 foot setback specified in Section 15(O-1)(5)(a)(ii) above may be reduced to no less
than 25 feet, horizontal distance, if, prior to construction, the landowner or the landowner's designated agent
demonstrates to the Planning Board's satisfaction that no reasonable alternative exists and that _appropriate
techniques will be used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water body, tributary stream or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected.
(c) On slopes of 10 percent or greater, the land management road setback must be increased by at least 20 feet,
horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent increase in slope above 10
percent.
(d) New land management roads are not allowed within the shoreland area along Significant River Segments as
identified in 38 M.R.S.A. section 437, nor in a Resource Protection District, unless, prior to construction, the
landowner or the landowner's designated agent makes a clear demonstration to the Planning Board's satisfaction
' that no reasonable alternative route exists outside the shoreland zone, and that the new road must be set back as far
as practicable from the normal high-water line and screened from the river by existing vegetation.
{e) Ditches, culverts, bridges, dips, water turnouts and other water control installations associated with roads must
be maintained on a regular basis to assure effective functioning. Drainage structures shall deliver a dispersed flow of
water into an unscarified filter strip no less than the width indicated in the setback requirements in Section 15(O-
1)(7). Where such a filter strip is impracticable, appropriate techniques shall be used to avoid sedimentation of the
water body, tributary stream, or wetland. Such techniques may include the installation ofsump holes or settling
basins, and/or the effective use of additional ditch relief culverts and ditch water turnouts placed to avoid
sedimentation of the water body, tributary stream, or wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be corrected.
(f)_ Road closeout and discontinuance. Maintenance of the water control installations required in Section 15(0-
1)(5)(e). must _continue until use of the rdad is discontinued and the road is put to bed by effective installation of
water bars or other adequate road drainage structures at appropriate intervals, constructed to avoid surface water
flowing over or under the water bar, and extending a sufficient distance beyond the traveled way so that water does
not reenter the road surface.
(g) Upgrading existing roads. Extension or enlargement of presently existing roads must conform to the provisions of
Section 15(0-1). Any nonconforming existing road may continue to exist and to be maintained, as long as the
nonconforming conditions are not made more nonconforming.
(h) Exception. Extension or enlargement of presently existing roads need not conform to the setback requirements of
Section 15(O-1)(5)(a) if, prior to extension or enlargement, the landowner or the landowner's designated agent
demonstrates to the Planning Board's satisfaction that no reasonable alternative exists_and that appropriate
techniques will be used to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective use of additional ditch relief
culverts and turnouts placed to avoid sedimentation of the water body, tributary stream, or wetland. If, despite such
precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions must be corrected.
Page 4 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
(i) Additional measures. In addition to the foregoing minimum requirements,persons undertaking construction and
maintenance of roads and river, stream and tributary stream crossings must take reasonable measures to avoid .
sedimentation of surface waters.
(6) Crossings of waterbodies. Crossings of rivers, streams, and tributary streams must allow for fish passage at all times of
the year, must not impound water, and must allow for the maintenance of normal flows.
(a) Determination of flow. Provided they are properly applied and used for the circumstances for which they are
designed, methods including but not limited to the following are acceptable as a means of calculating the 10 year and
25 year frequency water flows and thereby determining water crossing sizes as required in Section 15(O-1): The
United States Geological Survey (USGS) Methods; specifically: Hodgkins, G. 1999. Estimating the Magnitude of Peak
Flows for Streams in Maine for Selected Recurrence Intervals. U.S. Geological Survey. Water Resources Investigations
Report 99-4008. 45 pp. .
(b) Upgrading existing water crossings. Extension or enlargement of presently existing water crossings must conform
to the provisions of Section 15(O-1). Any nonconforming existing water crossing may continue to exist and be
maintained, as long as the nonconforming conditions are not made more nonconforming; however, any maintenance
or repair work done below the normal high-water line must conform to the provisions of Section 15(O-1).
(c) Other Agency Permits. Any timber harvesting and related activities involving the design, construction, and
maintenance of crossings on waterbodies other than a river, stream or tributary stream may require a permit from
the Land Use Regulation Commission, the Department of Environmental Protection, or the US Army Corps of
Engineers.
(d) Any timber harvesting and related activities involving the design, construction, and maintenance of crossings of
freshwater wetlands identified by the Department of Inland Fisheries and Wildlife as essential wildlife habitat require
prior consultation with the Department of Inland Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water crossing construction maintenance, alteration and
. replacement activities in shoreland areas must be given to the Bureau prior to the commencement of such activities.
Such notice must contain all information required by the Bureau, including: ;
(i) a map showing the location of all proposed permanent crossings;
{ii)_ the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a permit from state or federal agencies, a copy of the
approved permit or permits; and
; (iv) a statement signed by the responsible party that all temporary and permanent crossings will be constructed,
; maintained, and closed out in accordance with the requirements of this Section.
(f)_ Water crossing standards. All crossings of rivers require a bridge or culvert sized according to the requirements of
Section 15(O-1)(6)(g)) below. Streams and tributary streams may be crossed using temporary structures that are not
bridges or culverts provided:
(i) concentrated water runoff does not enter the stream or tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
Page 5 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
' Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
. (iii) there is no substantial disturbance of the bank, or stream or tributary stream channel;
(iv) fish passage is not impeded; and,
, (v) water flow is not unreasonably impeded.
Subject to Section 15(O-1)(6)(f)(i-v) above, skid trail crossings of streams and tributary streams when channels of such
streams and tributary streams are frozen and snow-covered or are composed of a hard surface which will not be
eroded or otherwise damaged are not required to use permanent or temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels with a bridge or culvert, the
following requirements apply:
(i) Bridges and culverts must be installed and maintained to provide an opening sufficient in size and structure to
accommodate 10 year frequency water flows or with a cross-sectional area at least equal to 2 1/2 times the
cross-sectional area of the river, stream, or tributary stream channel.
(ii) Temporary bridge and culvert sizes may be smaller than provided in Section 15(O-1)(6)(g)(i) if techniques are
effectively employed such that in the event of culvert or bridge failure, the natural course of water flow is
maintained and sedimentation of the water body or tributary stream is avoided. Such crossing structures must
be at least as wide as the channel and placed above the normal high-water line. Techniques may include, but are
not limited to, the effective use of any, a combination of, or all of the following:
1._use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii) Culverts utilized in river, stream and tributary stream crossings must:
1. be installed at or below river, stream or tributary stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of the culvert;
4, be covered by soil to_a minimum depth of 1 foot or according to the culvert manufacturer's
specifications, whichever is greater; and
5. have a headwall at the inlet end which is adequately stabilized by riprap or other suitable means to
reasonably avoid erosion of material around the culvert.
(iv) River, stream and tributary stream crossings allowed under Section 15(O-1), but located in flood hazard areas
{i.e. A zones) as identified on a community's Flood Insurance Rate Maps (FIRM) or Flood Hazard Boundary Maps
Page 6 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
(FHBM), must be designed and constructed under the stricter standards contained in that community's National
Flood Insurance Program (NFIP). For example, a water crossing may be required to pass a 100-year flood event. °
(v) Exception. Skid trail crossings of tributary streams within shoreland areas and wetlands adjacent to such
streams may be undertaken _in a manner not in conformity with the requirements of the foregoing subsections
provided persons conducting such activities takereasonable measures to avoid the disruption of shoreline
integrity, the occurrence of sedimentation of water, and the disturbance of stream banks, stream channels,
shorelines, and soil lying within ponds and wetlands. If, despite such precautions, the disruption of shoreline
integrity, sedimentation of water, or the disturbance of stream banks, stream channels, shorelines, and soil lying
within ponds and _ wetlands occurs, such conditions must be corrected.
(h) Skid trail closeout. Upon completion of timber harvesting and related activities, or upon the expiration of a Forest
Operations Notification, whichever is earlier, the following requirements apply:
(i) Bridges and culverts installed for river, stream and tributary stream crossings by skid trails must either be
removed and areas of exposed soil stabilized, or upgraded to comply with the closeout standards for land
management roads in Section15(O-1)(6)(i) below.
(ii) Water crossing structures that are not bridges or culverts must either be removed immediately following
_ timber harvesting and related activities, or, if frozen into the river, stream or tributary stream bed or bank, as
soon as practical after snowmelt.
(iii) River, stream and tributary stream channels, banks and approaches to crossings of water bodies and
tributary streams must be immediately stabilized on completion of harvest, or if the ground is frozen and/or
snow-covered, as soon as practical after snowmelt. If, despite such precautions, sedimentation or the disruption
of shoreline integrity occurs, such conditions must be corrected. :
(i) Land management road closeout. Maintenance of the water control features must continue until use of the road is
discontinued and the road is put to bed by taking the following actions:
(i) Effective installation of water bars or other adequate road drainage structures at appropriate intervals,
constructed to reasonably avoid surface water flowing over or under the water bar, and extending sufficient
distance beyond the traveled way so that water does not reenter the road surface.
(ii) Water crossing structures must be appropriately sized or dismantled and removed in a manner that
reasonably avoids sedimentation of the water body or tributary stream.
(iii) Any bridge or water crossing culvert in roads to be discontinued shall satisfy one of the following
requirements:
1._it shall be designed to provide an opening sufficient in size and structure to accommodate 25 year
frequency water flows;
2. _it shall be designed to provide an opening with a cross-sectional area at least 3 1/2 times the cross-
sectional area of the river, stream or tributary stream channel; or
3.__it shall be dismantled and removed in a fashion to reasonably avoid sedimentation of the river, stream
or tributary stream. ;
Page 7 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
* » Amendments to the Shoreland Zoning Ordinance for the Municipality of West Paris, originally enacted in 2004,
Adopted by Town Meeting on March 1, 2008
If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs, such conditions
must be corrected.
(7) Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained as specified in Section 15(O-1),
but in no case shall be less than shown in the following table.
Average slope of land between Width of strip between exposed
exposed mineral soil and mineral soil and shoreline
shoreland (percent) (feet along surface of the ground)
Page 8 of 8
A true copy Attest:
Town Clerk, West Paris, Maine
: ;
¢ e 4
oN
)
}
4 }
STATE OF MAINE
DEPARTMENT OF ENVIRONMENTAL PROTECTION
MANDATORY SHORELAND ZONING ACT
TITLE 38 M.R.S.A. Sections 435 through 449
CS "4
AL 'a
i e
= pas!
a. rn
z g
ATE gg ww
Bureau of Land and Water Quality Revised : July 1, 2008
DEP0340-D2008
LC)
MANDATORY SHORELAND ZONING ACT
(TITLE 38, M.R.S.A., SECTIONS 435-449)
38 _ 435. Shoreland areas
To aid in the fulfillment of the State's role as trustee of its waters and to promote public health, safety and the
general welfare, it is declared to be in the public interest that shoreland areas be subject to zoning and land
use controls. Shoreland areas include those areas within 250 feet of the normal high-water line of any great
pond, river or saltwater body, within 250 feet of the upland edge of a coastal wetland, within 250 feet of the
upland edge of a freshwater wetland except as otherwise provided in section 438-A, subsection 2, or within
75 feet of the high-water line of a stream. The purposes of these controls are to further the maintenance of
safe and healthful conditions; to prevent and control water pollution; to protect fish spawning grounds,
aquatic life, bird and other wildlife habitat; to protect buildings and lands from flooding and accelerated
erosion; to protect archaeological and historic resources; to protect commercial fishing and maritime
industries; to protect freshwater and coastal wetlands; to control building sites, placement of structures and
land uses; to conserve shore cover, and visual as well as actual points of access to inland and coastal
waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
It is further declared that, in accordance with Title 12, section 402, certain river and stream segments, as
identified in the Department of Conservation's 1982 Maine Rivers Study and as specifically delineated in
section 437, are significant river segments and deserve special shoreland zoning controls designed to
protect their natural and recreational features.
Zoning ordinances adopted pursuant to this article need not depend upon the existence of a zoning
ordinance for all of the land and water areas within a municipality, notwithstanding Title 30-A, section 4503,
as it is the intention of the Legislature to recognize that it is reasonable for municipalities to treat shoreland
areas specially and immediately to zone around water bodies rather than to wait until such time as zoning
ordinances may be enacted for all of the land within municipal boundaries.
All existing municipal ordinances dealing with subjects of this section currently in effect and operational on
April 18, 1986, are declared to be valid and shall continue in effect until rescinded, amended or changed
according to municipal ordinance, charter or state law.
38 _ 436. Definitions (REPEALED)
38 436-A. Definitions
As used in this chapter, unless the context otherwise indicates, the following terms have the following
meanings.
1. Coastal wetlands. "Coastal wetlands" means all tidal and subtidal lands; all lands with vegetation
present that is tolerant of salt water and occurs primarily in a salt water or estuarine habitat; and any
swamp, marsh, bog, beach, flat or other contiguous low land that is subject to tidal action during the
highest tide level for the year in which an activity is proposed as identified in tide tables published by the
National Ocean Service. Coastal wetlands may include portions of coastal sand dunes. (2005)
1-A. Basement. "Basement" means any portion of a structure with a floor-to-ceiling height of 6 feet or
more and having more than 50% of its volume below the existing ground level.
2. Commercial fishing activities. "Commercial fishing activities" means activities directly related to
commercial fishing and those commercial activities commonly associated with or supportive of
commercial fishing, such as the manufacture or sale of ice, bait and nets, and the sale, manufacture,
installation or repair of boats, engines and other equipment commonly used on boats.
3. Densely developed area. "Densely developed area" means any commercial, industrial or compact
residential area of 10 or more acres with a density of at least one principal structure per 2 acres.
4. Floodway. "Floodway" means the channel of a river or other water course and the adjacent land
areas that must be reserved to allow for the discharge of a 100-year flood without cumulatively
increasing the water surface elevation of the 100-year flood by more than one foot.
5. Freshwater wetlands. "Freshwater wetlands" means freshwater swamps, marshes, bogs and
similar areas, other than forested wetlands, which are:
A. Of 10 or more contiguous acres, or of less than 10 contiguous acres and adjacent to a surface
water body, excluding any river, stream or brook, such that, in a natural state, the combined surface
area is in excess of 10 acres; and
B. Inundated or saturated by surface or ground water at a frequency and for a duration sufficient to
support, and which under normal circumstances do support, a prevalence of wetland vegetation
typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to the
criteria of this subsection.
5-A. Forested wetland. "Forested wetland" means a freshwater wetland dominated by woody
vegetation that is 6 meters tall or taller.
6. Functionally water-dependent uses. "Functionally water-dependent uses" means those uses that
require, for their primary purpose, location on submerged lands or that require direct access to, or
location in, coastal or inland waters and that can not be located away from these waters. These uses
include commercial and recreational fishing and boating facilities, excluding recreational boat storage
buildings, finfish and shellfish processing, fish storage and retail and wholesale marketing facilities,
waterfront dock and port facilities, shipyards and boat building facilities, marinas, navigation aids, basins
and channels, retaining walls, industrial uses dependent upon water-borne transportation or requiring
large volumes of cooling or processing water that can not reasonably be located or operated at an inland
site and uses that primarily provide general public access to coastal or inland waters.
7. Great pond. "Great pond" means any inland body of water which in a natural state has a surface
area in excess of 10 acres and any inland body of water artificially formed or increased which has a
surface area in excess of 30 acres except for the purposes of this article, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner.
8. Maritime activities. "Maritime activities" means the construction, repair, storage, loading and
unloading of boats, chandlery and other commercial activities designed and intended to facilitate
maritime trade.
9. Normal high-water line. "Normal high-water line" means that line which is apparent from visible -
markings, changes in the character of soils due to prolonged action of the water or changes in
vegetation, and which distinguishes between predominantly aquatic and predominantly terrestrial land.
9-A. Outlet stream. "Outlet stream" means any perennial or intermittent stream, as shown on the
most recent edition of a 7.5-minute series or, if not available, a 15-minute series topographic map
produced by the United States Geological Survey, that flows from a freshwater wetland.
10. Principal structure. "Principal structure" means a building other than one which is used for
purposes wholly incidental or accessory to the use of another building on the same premises.
2
11. River. "River" means a free-flowing body of water including its associated flood plain wetlands from
that point at which it provides drainage for a watershed of 25 square miles to its mouth.
11-A. Stream. "Stream" means a free-flowing body of water from the outlet of a great pond or the
point of confluence of 2 perennial streams as depicted by a solid blue line on the most recent edition of a
United States Geological Survey 7.5-minute series topographic map, or if not available, a 15-minute
series topographic map, to the point where the body of water becomes a river or flows to another water
body or wetland within a shoreland area.
12. Structure. "Structure" means anything built for the support, shelter or enclosure of persons,
animals, goods or property of any kind, together with anything constructed or erected with a fixed
location on or in the ground, exclusive of fences.
13. Timber harvesting. "Timber harvesting" means the cutting and removal of trees from their growing
site and the attendant operation of cutting and skidding machinery, but not the construction or creation of
roads. Timber harvesting does not include the clearing of land for approved construction.
38 _ 437. Significant river segments identified
For purposes of this chapter, significant river segments include the following:
1. Aroostook River. The Aroostook River from St. Croix Stream in Masardis to the Masardis and
T.10, R.6, W.E.L.S. townline, excluding segments in T.9, R.5, W.E.L.S.; including its tributary the Big
Machias River from the Aroostook River in Ashland to the Ashland and Garfield Plantation townlines;
2. Dennys River. The Dennys River from the railroad bridge in Dennysville Station to the dam at
Meddybemps Lake, excluding the western shore in Edmunds Township and No. 14 Plantation;
3. East Machias River. The East Machias River from 1/4 of a mile above the Route 1 bridge in East
Machias to the East Machias and T.18, E.D., B.P.P. townline, and from the T.19, E.D., B.P.P. and
Wesley townline to the outlet of Crawford Lake in Crawford, excluding Hadley Lake;
4. Fish River. The Fish River from the former bridge site at the dead end of Mill Street in Fort Kent
Mills to the outlet of Eagle Lake in Wallagrass, and from the Portage Lake and T.14, R.6, townline to the
Portage Lake and T.13, R.7, W.E.L.S. townline, excluding Portage Lake; (2007)
5. Machias River. The Machias River from the Whitneyville and Machias townline to the Northfield
T.19, M.D., B.P.P. townline;
6. Mattawamkeag River. The Mattawamkeag River from the outlet of Mattakeunk Stream in Winn to
the Mattawamkeag and Kingman Township townline, and from the Reed Plantation and Bancroft
townline to the East Branch, including its tributaries the West Branch from the Mattawamkeag River to
the Haynesville T.3, R.3, W.E.L.S. townline and from its inlet into Upper Mattawamkeag Lake to the
Route 2 bridge; the East Branch from the Mattawamkeag River to the Haynesville and Forkstown
Township townline and from the T.4, R 3, W.E.L.S. and Oakfield townline to Red Bridge in Oakfield; the
Fish Stream from the Route 95 bridge in Island Falls to the Crystal-Patten townline; and the Baskehegan
Stream from its inlet into Crooked Brook Flowage in Danforth to the Danforth and Brookton Township
townline;
7. Narraguagus River. The Narraguagus River from the ice dam above the railroad bridge in
Cherryfield to the Beddington and Devereaux Township townline, excluding Beddington Lake;
8. East Branch of Penobscot. The East Branch of the Penobscot from the Route 157 bridge in
Medway to the East Millinocket and Grindstone Township townline;
3
9. Pleasant River. The Pleasant River from the railroad bridge in Columbia Falls to the Columbia and
T.18, M.D., B.P.P. townline, and from the T.24, M.D., B.P.P. and Beddington townline to the outlet of
Pleasant River Lake;
10. Rapid River. The Rapid River from the Magalloway Plantation and Upton townline to the outlet of
Pond in the River;
11. West Branch Pleasant River. The West Branch Pleasant River from the East Branch to the
Brownville and Williamsburg Township townline; and
12. West Branch of Union River. The West Branch of the Union River from the Route 9 bridge in
Amherst to the outlet of Great Pond in the Town of Great Pond.
38 _ 438. Municipal control (REPEALED)
38 _ 438-A. Municipal authority; state oversight
With respect to all shoreland areas described in section 435, municipalities shall adopt zoning and land use
control ordinances pursuant to existing enabling legislation, under home rule authority and in accordance
with the following requirements. The deadline for municipalities to adopt a shoreland zoning ordinance
meeting the minimum guidelines adopted by the Board of Environmental Protection is extended to July 1,
1992.
Notwithstanding other provisions of this article, the regulation of timber harvesting and timber harvesting
activities in shoreland areas must be in accordance with section 438-B and rules adopted by the
Commissioner of Conservation pursuant to Title 12, section 8867-B. (2003)
1. Land use guidelines. In accordance with Title 5, chapter 375, subchapter II, the Board of
Environmental Protection shall adopt, and from time to time shall update and amend, minimum
guidelines for municipal zoning and land use controls that are designed to carry out the legislative
purposes described in section 435 and the provisions of this article. These minimum guidelines must
include provisions governing building and structure size, setback and location and establishment of
resource protection, general development, limited residential, commercial fisheries and maritime activity
zones and other zones. Within each zone, the board shall prescribe uses that may be allowed with or
without conditions and shall establish criteria for the issuance of permits and nonconforming uses, land
use standards and administrative and enforcement procedures. These guidelines must also include a
requirement for a person issued a permit pursuant to this article in a great pond watershed to have a
copy of the permit on site while work authorized by the permit is being conducted. The board shall
comprehensively review and update its guidelines and shall reevaluate and update the guidelines at
least once every 4 years.
A. Minimum guidelines adopted by the board under this subsection may not require the issuance of
a municipal permit for the repair and maintenance of an existing road culvert or for the replacement
of an existing road culvert, as long as the replacement culvert is:
(2) Not more than 25% longer than the culvert being replaced; and
(3) Not longer than 75 feet.
Ancillary culverting activities, including excavation and filling, are included in this exemption. A
person repairing, replacing or maintaining an existing culvert under this paragraph shall ensure that
erosion control measures are taken to prevent sedimentation of the water and that the crossing does
not block fish passage in the water course.
4
. 1-A. Minimum guidelines; limitations. The minimum guidelines adopted under subsection 1
may not require a municipality, in adopting an ordinance, to:
A. Treat an increase in hours or days of operation of a nonconforming use as an expansion of a
nonconforming use; or
B. Treat as a single lot, 2 or more contiguous lots, at least one of which is nonconforming, owned by
the same person or persons on the effective date of the municipal ordinance and recorded in the
registry of deeds if the lot is served by a public sewer or can accommodate a subsurface sewage
disposal system in conformance with state subsurface wastewater disposal rules, and:
(1) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of
lot area; or
(2) Any lots that do not meet the frontage and lot size requirements of subparagraph (1) are
reconfigured or combined so that each new lot contains at least 100 feet of shore frontage
and 20,000 square feet of lot area.
For purposes of this paragraph the term "nonconforming" means that a lot does not meet the
minimum standards for lot area and shore frontage required by municipal ordinances adopted
pursuant to this article.
1-B. Notification to landowners. This subsection governs notice to landowners whose property
is being considered for placement in a resource protection zone.
A. In addition to the notice required by Title 30-A, section 4352, subsection 9, a municipality shall
provide written notification to landowners whose property is being considered by the municipality for
placement in a resource protection zone. Notification to landowners must be made by first-class
mail to the last known addresses of the persons against whom property tax on each parcel is
assessed. The municipal officers shall prepare and file with the municipal clerk a sworn, notarized
certificate indicating those persons to whom notice was mailed and at what addresses, and when, by
whom and from what location notice was mailed. This certificate constitutes prima facie evidence
that notice was sent to those persons named in the certificate. The municipality must send notice
not later than 14 days before its planning board votes to establish a public hearing on adoption or
amendment of a zoning ordinance or map that places the landowners' property in the resource
protection zone. Once a landowner's property has been placed in a resource protection zone,
individual notice is not required to be sent to the landowner when the zoning ordinance or map is
later amended in a way that does not affect the inclusion of the landowner's property in the resource
protection zone.
; B. In addition to the notice required by this Title or by rules adopted pursuant to this Title, the board
shall provide written notification to landowners whose property is being considered by the, board for
placement in a resource protection zone. Notification to landowners must be made by first-class
mail to the last known addresses of the persons against whom property tax on each parcel is
assessed. The board shall prepare and file with the commissioner a sworn, notarized certificate
indicating those persons to whom notice was mailed and at what addresses, and when, by whom
and from what location notice was mailed. This certificate constitutes prima facie evidence that
notice was sent to those persons named in the certificate. The board must send notice not later than
30 days before the close of the public comment period prior to formal consideration of placement of
the property in a resource protection zone by the board. Upon request of the board, the municipality
for which the ordinance is being adopted shall provide the board with the names and addresses of ,
persons entitled to notice under this subsection. Notification and filing of a certificate by the
department are deemed to be notification and filing by the board for purposes of this section.
5
C. Any action challenging the validity of an ordinance based on failure by the board or municipality
to comply with this subsection must be brought in Superior Court within 30 days after adoption or
amendment of the ordinance or map. The Superior Court may invalidate an amended ordinance or
map if the appellant demonstrates that the appellant was entitled to receive notice under this
subsection, that the municipality or board failed to send notice as required, that the appellant had no
knowledge of the proposed adoption or amendment of the ordinance or map, and that the appellant
was materially prejudiced by that lack of knowledge. This paragraph does not alter the right of a
person to challenge the validity of any ordinance or map based on the failure of a municipality to
provide notice as required by Title 30-A, section 4352, subsection 9 or the failure of the board to
provide notice as required by this Title.
2. Municipal ordinances. In accordance with a schedule adopted by the board and acting in
accordance with a local comprehensive plan, municipalities shall prepare and submit to the
commissioner zoning and land use ordinances that are consistent with or are no less stringent than the
minimum guidelines adopted by the board and, for coastal communities, that address the coastal
management policies cited in section 1801. When a municipality determines that special local conditions
within portions of the shoreland zone require a different set of standards from those in the minimum
guidelines, the municipality shall document the special conditions and submit them, together with its
proposed ordinance provisions, to the commissioner for review and approval.
Notwithstanding section 435, a municipality may limit to 75 feet the shoreland zone around a freshwater
wetland that has not been rated by the Department of Inland Fisheries and Wildlife as having moderate
or high value provided that the municipality applies the requirements of this article regarding streams as
defined under section 436-A to any outlet stream from any freshwater wetland.
3. Commissioner approval. Municipal ordinances, amendments and any repeals of ordinances are
not effective unless approved by the commissioner. In determining whether to approve municipal
ordinances or amendments, the commissioner shall consider the legislative purposes described in
section 435, the minimum guidelines and any special local conditions which, in the judgment of the
commissioner, justify a departure from the requirements of the minimum guidelines in a manner not
inconsistent with the legislative purposes described in section 435. Recognizing that the guidelines are
intended as minimum standards, the commissioner shall approve a municipal ordinance that imposes
more restrictive standards than those in the guidelines. If an ordinance or an amendment adopted by a
municipality contains standards inconsistent with or less stringent than the minimum guidelines, the
commissioner, after notice to the municipality, may approve the proposed ordinances or amendment
with conditions imposing the minimum guidelines in place of the inconsistent or less stringent standard
or standards. Those conditions are effective and binding within the municipality and must be
administered and enforced by the municipality. If the commissioner fails to act on any proposed
municipal ordinance or amendment within 45 days of the commissioner's receipt of the proposed
ordinance or amendment, the ordinance or amendment is automatically approved. Any application for a
shoreland zoning permit submitted to a municipality within the 45-day period is governed by the terms of
the proposed ordinance or amendment if the ordinance or amendment is approved under this
subsection. A municipality may appeal to the board a decision of the commissioner under this
subsection.
4. Failure to adopt ordinances. If the commissioner determines, after notice to a municipality, that
the municipality has failed to adopt ordinances as required under this article or that an ordinance that the
municipality has adopted does not satisfy the requirements and purposes under this article, and that the
commissioner is unable to make the ordinance consistent with the minimum guidelines by the imposition
of conditions, as set forth in subsection 3, then the commissioner shall request and the board may adopt,
acting in accordance with Title 5, chapter 375, subchapter II, suitable ordinances, or suitable provisions
of ordinances, on behalf of the municipality. Notwithstanding subsections 2 and 3, if the board
determines that special water quality considerations on a great pond warrant more restrictive standards
than those contained in the minimum guidelines, the board may: adopt the additional standards for all
municipalities outside the jurisdiction of the Maine Land Use Regulation Commission which abut those
6
waters. Following adoption by the board, these ordinances or provisions are effective and binding within
the municipality and must be administered and enforced by that municipality. The board may adopt
modifications to ordinances adopted pursuant to this subsection. Preparation and notice of proposed
modifications, prior to consideration by the board, may be initiated by the commissioner.
5. Exemptions. Any areas within a municipality that are subject to nonmunicipal zoning and land use
controls may be exempted from the operation of this section upon a finding by the commissioner that the
purposes of this chapter have been accomplished by nonmunicipal measures.
6-A. Variances. A copy of a request for a variance under an ordinance approved or imposed by the
commissioner or board under this article must be forwarded by the municipality to the commissioner at
least 20 days prior to action by the municipality. The material submitted must include the application and
all supporting information provided by the applicant. The commissioner may comment when the
commissioner determines that the municipal issuance of the variance would not be in compliance with
the requirements of state law for a zoning variance or that the variance would undermine the purposes
stated in section 435. These comments, if submitted by the commissioner prior to the action by the
municipality, must be made part of the record and must be considered by the municipality prior to taking
action on the variance request. (2005)
7. Exclusion of recreational boat storage buildings. Notwithstanding subsection 3, the exclusion of
recreational boat storage buildings from the definition of "functionally water-dependent uses" is deemed
to be incorporated into each municipal shoreland zoning ordinance on the effective date of this
subsection, regardless of any prior approval of the ordinance by the commissioner.
38 _ 438-B. Timber Harvesting and timber harvesting activities in shoreland areas; authority of
Director of Bureau of Forestry in the Department of Conservation (2003)
Except as provided in subsection 4, beginning on the effective date established under subsection 5, rules
adopted by the Commissioner of Conservation under Title 12, section 8867-B apply statewide for the
purpose of regulating timber harvesting and timber harvesting activities in shoreland areas.
1. Definitions. As used in this section, unless the context otherwise indicates, the following terms
have the following meanings.
A. "Director" means the Director of the Bureau of Forestry within the Department of Conservation.
B. "Statewide standards" means the performance standards for timber harvesting activities adopted
pursuant to Title 12, section 8867-B.
C. "Timber harvesting" means cutting or removal of timber for the primary purpose of selling or
processing forest products.
D. "Timber harvesting activities" means the construction and maintenance of roads used primarily
for timber harvesting and other activities conducted to facilitate timber harvesting.
2. Municipal acceptance of statewide standards. A municipality may choose to have the statewide
standards apply to timber harvesting and timber harvesting activities in that municipality by authorizing
the repeal of all provisions within the municipal shoreland zoning ordinance that regulate timber
harvesting and timber harvesting activities in shoreland areas and notifying the director of the repeal.
The authorization must specify a repeal date consistent with the effective date established under
subsection 5. When the municipality accepts the statewide standards in accordance with this
subsection, the director shall administer and enforce the statewide standards within that municipality
beginning on the effective date established under subsection 5.
7
3. Municipal adoption of ordinance identical to statewide standards. A municipality may adopt an
ordinance to regulate timber harvesting and timber harvesting activities that is identical to the statewide
standards. A municipality that adopts an ordinance under this subsection may request the director to
administer and enforce the ordinance or to participate in joint administration and enforcement of the
ordinance with the municipality beginning on the effective date established under subsection 5. When a
municipality requests joint responsibilities, the director and the municipality shall enter into an agreement
that delineates the administrative and enforcement duties of each. To continue to receive administrative
and enforcement assistance from the director under this subsection, a municipality must amend its
ordinance as necessary to maintain identical provisions with the statewide standards.
4. Municipal ordinances that are not identical to statewide standards. A municipal ordinance
regulating timber harvesting and timber harvesting activities that is in effect and consistent with state
laws and rules in effect on December 31, 2005 continues in effect unless action is taken in accordance
with subsection 2 or 3. A municipality that retains an ordinance with provisions that differ from the
statewide standards shall administer and enforce that ordinance. A municipality may not amend a
municipal ordinance regulating timber harvesting and timber harvesting activities unless the process
established in Title 12, section 8869, subsection 8 is followed. Beginning on the effective date
established under subsection 5, a municipality may not amend an ordinance regulating timber harvesting
and timber harvesting activities in a manner that results in standards that are less stringent than or
otherwise conflict with the statewide standards.
5. Effective date for statewide standards. Except as provided in subsection 4, rules adopted by the
Commissioner of Conservation under Title 12, section 8867-B apply statewide beginning on the first day
of January of the 2™ year following the year in which the Commissioner of Conservation determines that
at least 252 of the 336 municipalities identified by the Commissioner of Conservation as the
municipalities with the highest acreage of timber harvesting activity on an annual basis for the period
1999-2003 have either accepted the statewide standards in accordance with subsection 2 or have
adopted an ordinance identical to the statewide standards in accordance with subsection 3. Within 30
days of making the determination that the 252-municipality threshold has been met, the Commissioner of
Conservation shall notify the Secretary of State in writing and advise the secretary of the effective date
for the statewide standards.
38 _ 439. Requirements (REPEALED)
38 _ 439-A. Additional municipal powers, limitations
1. Additional controls. In addition to the ordinances required by this chapter, municipalities may
adopt zoning and land use controls applicable to other bodies of water as may be required to protect the
public health, safety and general welfare and further the purposes of this article.
2. Jurisdiction. Notwithstanding the scope of shoreland areas as identified in section 435, the
jurisdiction of municipal shoreland zoning and land use control ordinances adopted under this article
may include any structure built on, over or abutting a dock, wharf, pier or other structure extending or
located below the normal high-water line of a water body or within a wetland. Accordingly, municipalities
may enact ordinances affecting structures that extend or are located over the water or are placed on
lands lying between high and low waterlines or within wetlands.
3. Soil evaluation reports. Any other law notwithstanding, when a zoning ordinance adopted in
conformity with this article requires a written report of soil suitability for subsurface waste disposal or
commercial or industrial development, that report must be prepared and signed by a duly qualified
person who has made an on-the-ground evaluation of the soil properties involved. Persons qualified to
prepare these reports must be certified by the Department of Health and Human Services and include
Maine State Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and evaluation of soil
properties and can provide proof of this training and experience in a manner specified by the Department
8
of Health and Human Services. The Department of Health and Human Services may promulgate rules
for the purpose of establishing training and experience standards required by this subsection.
4. Setback requirements. Notwithstanding any provision in a local ordinance to the contrary, all new
principal and accessory structures and substantial expansions of such structures within the shoreland
zone as established by section 435 must meet the water setback requirements approved by the board,
except functionally water-dependent uses. For purposes of this subsection, a substantial expansion of a
building is an expansion that increases either the volume or floor area by 30% or more. This subsection
is not intended to prohibit a municipal board of appeals from granting a variance, subject to the
requirements of this article and Title 30-A, section 4353, nor is it intended to prohibit a less than
substantial expansion of a legally existing nonconforming structure, as long as the expansion does not
create further nonconformity with the water setback requirement.
4-A. Alternative expansion requirement. Notwithstanding subsection 4, a municipality may adopt an
ordinance pursuant to this subsection that permits expansions of principal and accessory structures that
do not meet the water setback requirements approved by the Board of Environmental Protection if the
ordinance is no less restrictive than the requirements in this subsection.
A. All new principal and accessory structures, excluding functionally water-dependent uses, must
meet the water setback requirements approved by the Board of Environmental Protection. An
expansion of a legally existing nonconforming structure pursuant to this subsection may not create
further nonconformity with the water setback requirement.
B. Expansion of any portion of a structure within 25 feet of the normal high-water line of a water
body or upland edge of a wetland is prohibited, even if the expansion will not increase nonconformity
with the water setback requirement. Expansion of an accessory structure that is located closer to
the normal high-water line of a water body or upland edge of a wetland than the principal structure is
prohibited, even if the expansion will not increase the nonconformity with the water setback
requirement.
C. Legally existing nonconforming principal and accessory structures that do not meet the water
setback requirements may be expanded or altered as follows, as long as other applicable standards
of land use adopted by the municipality are met and the expansion is not prohibited by paragraph A
or B.
(1) For structures located less than 75 feet from the normal high-water line of a water body or
upland edge of a wetland, the maximum combined total floor area for all structures is 1000
square feet, and the maximum height of any structure is 20 feet or the height of the existing
structure, whichever is greater.
(2) For structures located less than 100 feet from the normal high-water line of a great pond
classified as GPA or a river flowing to a great pond classified as GPA, the maximum combined
total floor area for all structures is 1,500 square feet, and the maximum height of any structure is
25 feet or the height of the existing structure, whichever is greater, except that any portion of
those structures located less than 75 feet from the normal high-water line or upland edge of a
wetland must meet the floor area and height limits in subparagraph (1).
Existing principal and accessory structures that exceed the floor area or height limits under this
paragraph may not be expanded, except as provided in paragraph E.
For the purposes of this paragraph, a basement is not counted toward floor area.
D. Whena basement is added to an existing structure or when a basement is constructed as part
of a reconstruction or replacement structure, the structure and the basement must be placed so that
9
the setback is met to the greatest practical extent, as determined by the municipal planning board or,
if authorized by the municipal planning board, the certified code enforcement officer.
E. A municipality may permit an expansion that causes the maximum floor area limits established in
paragraph C to be exceeded by not more than 500 square feet if:
(1) The principal structure is set back at least 50 feet from the normal high-water line of a water
body or upland edge of a wetland:
(2) An existing well-distributed stand of trees and other vegetation, as defined in the minimum
guidelines adopted by the Board of Environmental Protection, extends at least 50 feet inland
from the normal high-water line or upland edge of a wetland for the entire wide of the property
or, if such a stand is not present, a written plan by the property owner to reestablish a buffer of
native trees, shrubs, and other ground cover within 50 feet of the normal high-water line or
upland edge of a wetland is approved by the municipal planning board. The plan must be
implemented at the time of construction and must be designed to meet the minimum guidelines
adopted by the Board of Environmental Protection as the vegetation matures. Rules adopted
pursuant to this subparagraph are routine technical rules pursuant to Title 5, chapter 375,
subchapter II-A; and
(3) The municipal planning board approves a written mitigation plan. The plan must be
developed, implemented and maintained by the property owner. A mitigation plan must provide
for the following mitigation measures.
(a) Unstabilized areas resulting in soil erosion must be mulched, seeded or otherwise
stabilized and maintained to prevent further erosion and sedimentation to water bodies and
wetlands.
(b) Roofs and associated drainage systems, driveways, parking areas and other
nonvegetated surfaces must be designed or modified, as necessary, to prevent
concentrated flow of storm water runoff from reaching a water body or wetland. Where
possible, runoff must be directed through a vegetated area or infiltrated into the soil through
the use of a dry well, stone apron or similar device.
The written plans required pursuant to subparagraphs 2 and 3 must be filed in the registry of deeds of
the county in which the property is located.
A copy of all permits issued pursuant to this paragraph must be forwarded by the municipality to the
department within 14 days of the issuance of the permit.
5. Timber harvesting. Municipal ordinances must regulate timber harvesting within the shoreland
area. Notwithstanding any provision in a local ordinance to the contrary, standards for timber harvesting
activities may not be less restrictive than the following:
A. Selective cutting of no more than 40% of the trees 4.5 inches or more in diameter, measured at 4
1/2 feet above ground level, in any 10-year period, as long as a well-distributed stand of trees and
other natural vegetation remains; (2007)
B. Within a shoreland area zoned for resource protection abutting a great pond there may not be
timber harvesting within the strip of land extending 75 feet inland from the normal high-water line
except to remove safety hazards or if a municipality adopts an ordinance pursuant to this paragraph.
A municipality may adopt an ordinance that allows limited timber harvesting within the 75-foot strip in
the resource protection zone when the following conditions are met:
1) The ground is frozen;
10
2) There is no resultant soil disturbance;
3) The removal of trees is accomplished using a cable or boom and there is no entry of
tracked or wheeled vehicles into the 75-foot strip of land;
4) There is no cutting of trees less than 6 inches in diameter; no more than 30% of the
trees 6 inches or more in diameter, measured at 4% feet above ground level, are cut in
any 10-year period; and a well-distributed stand of trees and other natural vegetation
remains; and
5) A licensed professional forester has marked the trees to be harvested prior to a permit
being issued by the municipality; and
(6) Any site within a shoreland area zoned for resource protection abutting a great pond,
beyond the 75-foot strip restricted in paragraph B, where timber is harvested must be
reforested within 2 growing seasons after the completion of the harvest, according to
guidelines adopted by the board. The board shall adopt guidelines consistent with
minimum stocking standards established under Title 12, section 8869.
The board may adopt more restrictive guidelines consistent with the purposes of this subchapter that
must then be incorporated into local ordinances. Timber harvesting operations exceeding the 40%
limitation in paragraph A may be allowed by a planning board upon a clear showing, including a forest
management plan signed by a Maine licensed professional forester, that such an exception is necessary ,
for good forest management and is carried out in accordance with the purposes of shoreland zoning.
The planning board shall notify the commissioner of each exception allowed.
6. Clearing of vegetation. Within the shoreland area, municipal ordinances shall provide for effective
vegetative screening between buildings and shorelines. Notwithstanding any provision in a local
ordinance to the contrary vegetative screening requirements shall be no less restrictive than the
following:
A. Within a strip extending 75 feet inland from the normal high-water line, there shall be no cleared
opening or openings, except for approved construction, and a well-distributed stand of vegetation
shall be retained;
B. Within a shoreland area zoned for resource protection abutting a great pond there shall be no
cutting of vegetation within the strip of land extending 75 feet inland from the normal high-water line
except to remove safety hazards; and
C. Selective cutting of no more than 40% of the trees 4.5 inches or more in diameter, measured at 4
1/2 feet above ground level, is allowed in any 10-year period, as long as a well-distributed stand of
trees and other natural vegetation remains. (2007)
The board may adopt more restrictive guidelines consistent with the purposes of this subchapter, which
shall then be incorporated into local ordinances.
7. Special exception. A municipal ordinance adopted pursuant to this article may include a provision
for the municipal planning board to issue a permit for construction of a single-family residence ina
Resource Protection District if the applicant demonstrates that all of the following conditions are met.
A. There is no location on the property, other than a location within the Resource Protection District,
where the structure can be built.
B. The lot on which the structure is proposed is undeveloped and was established and recorded in
the registry of deeds of the county in which the lot is located before the adoption of the Resource
Protection District.
C. The proposed location of all buildings, sewage disposal systems and other improvements are:
11
(1) Located on natural ground slopes of less than 20%: and
(2) Located outside the floodway of the 100-year floodplain along rivers and artificially
formed great ponds along rivers and outside the velocity zone in areas subject to tides,
based on detailed flood insurance studies and as delineated on the Federal Emergency
Management Agency's Flood Boundary and Floodway Maps and Flood Insurance Rate
Maps; all buildings, including basements, are elevated at least one foot above the 100-year
floodplain elevation; and the development is otherwise in compliance with any applicable
municipal floodplain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency maps, it is
deemed to be 1/2 the width of the 100-year floodplain. For purposes of this subparagraph,
"floodway" means the channel of a river or other watercourse and adjacent land areas that
must be reserved in order to discharge the 100-year flood without cumulatively increasing
the water surface elevation more than one foot in height and "velocity zone" means an area
of special flood hazard extending from offshore to the inland limit of the primary frontal dune
along an open coast and any other area subject to high-velocity wave action from storms or
seismic sources.
D. The total ground-floor area of all principal and accessory structures is limited to a maximum of
1,500 square feet.
E. All structures, except functionally water-dependent structures, are set back from the normal
high-water line or upland edge of a wetland to the greatest practical extent, but not less than 75
feet. In determining the greatest practical extent, the planning board shall consider the depth of
the lot, the slope of the land, the potential for soil erosion, the type and amount of vegetation to
be removed, the proposed building site's elevation in regard to the floodplain and its proximity to
moderate-value and high-value wetlands.
8. Archaeological excavation. A permit is not required for an archaeological excavation that is
within a shoreland zone as long as the excavation is conducted by an archaeologist listed on the Maine
Historic Preservation Commission level 1 or level 2 approved list and unreasonable erosion and
sedimentation is prevented by means of adequate and timely temporary and permanent stabilization
measures. (2001)
38 _ 439-B. Contractors certified in erosion control
1. Definition. For purposes of this section, "excavation contractor' means an individual or firm
engaged in a business that causes the disturbance of soil, including grading, filling and removal, or in a
business in which the disturbance of soil results from an activity that the individual or firm is retained to
perform.
2. Certification required. An excavation contractor conducting excavation activity in a shoreland
area shall ensure that a person certified in erosion control practices by the department:
A. ls responsible for management of erosion and sediment control practices at the site; and
B. Is present at the site each day earth-moving activity occurs for a duration that is sufficient to ensure
that proper erosion and sedimentation control practices are followed.
The requirements of this subsection apply until erosion control measures that will permanently stay in place
have been installed at the site or, if the site is to be revegetated, erosion control measures that will stay in
place until the area is sufficiently covered with vegetation necessary to prevent soil erosion have been
installed. (2008)
12
38 440. Federal flood insurance
In addition to controls required by this chapter, municipalities may extend or adopt zoning and subdivision
controls beyond the limits established by this chapter in order to protect the public health, safety and welfare
and to avoid problems associated with flood plain development.
Zoning ordinances adopted or extended pursuant to this section shall be pursuant to and consistent with a
comprehensive plan.
Zoning ordinances adopted or extended pursuant to this section need not depend upon the existence of a
zoning ordinance for all of the land and water area within a municipality, despite the provisions of Title 30-A,
section 4503, to the contrary, provided such ordinances are required for entrance of the municipality into the
Federal Flood Insurance Program. Ordinances or amendments adopted by authority of this section shall not
extend beyond an area greater than that necessary to comply with the requirements of the Federal Flood
Insurance Program.
Zoning ordinances adopted or amended pursuant to this section shall designate as a resource protection
zone or its equivalent, as defined in the guidelines adopted pursuant to section 438-A, subsection 1, all
areas within the floodway of the 100-year flood plain along rivers and in the velocity zone in areas subject to
tides, based on detailed flood insurance studies and as delineated on the Federal Emergency Management
Agency's Flood Boundary and Floodway Maps and Flood Insurance Rate Maps. This provision does not
apply to areas zoned for general development or its equivalent, as defined in the guidelines adopted
pursuant to section 438-A, subsection 1, as of the effective date of this paragraph, or within areas
designated by ordinances as densely developed. The determination of which areas are densely developed
shall be based on a finding that, as of the effective date of this paragraph, existing development meets the
definition in section 436, subsection 3.
All communities shall designate floodway areas, as set out in this section, as resource protection zones as of
the effective date of a community's entry into the regular program of the National Flood Insurance Program
or July 1, 1987, whichever comes later.
In those areas that are within the floodway, as delineated on the Federal Emergency Management Agency's
Flood Boundary and Floodway Maps and Flood Insurance Rate Maps, all proposed activities which are
permitted within the shoreland area must be shown not to increase the 100-year flood elevation. In addition,
all structures built in the floodway shall have their lowest floor, including the basement, one foot above the
100-year flood elevation.
38 440-A. Public access
In addition to controls required in this chapter, municipalities may extend or adopt zoning and subdivision
controls to protect any public rights for physical and visual access to the shoreline.
Zoning ordinances adopted or extended pursuant to this section shall be pursuant to and consistent with a
comprehensive plan.
38 441. Code enforcement officers
1. Appointment. In every municipality, the municipal officers shall annually by July 1st appoint or
reappoint a code enforcement officer, whose job may include being a local plumbing inspector or a
building inspector and who may or may not be a resident of the municipality for which he is appointed.
The municipal officers may appoint the planning board to act as the code enforcement officer. The
municipal officers may remove a code enforcement officer for cause, after notice and hearing. This
removal provision shall only apply to code enforcement officers who have completed a reasonable
period of probation as established by the municipality pursuant to Title 30-A, section 2601. If not
13
reappointed by a municipality, a code enforcement officer may continue to serve until a successor has
been appointed and sworn.
2. Certification; authorization by municipal officers. No person may serve as a code enforcement
officer who is authorized by the municipal officers to represent the municipality in District Court unless he
is currently certified under Title 30-A, section 4221, subsection 2, as being familiar with court
procedures.
Upon written authorization by the municipal officers, a certified code enforcement officer may serve civil
process on persons whom he determines to be in violation of ordinances adopted pursuant to this
chapter and, if authorized by the municipal officers, may represent the municipality in District Court in the
prosecution of violations of ordinances adopted pursuant to this chapter.
3. Powers and duties. The duties of the code enforcement officer shall include the following:
A. Enforce the local shoreland zoning ordinance in accordance with the procedures contained
therein;
B. Collect a fee, if authorized by a municipality, for every shoreland permit issued by the code
enforcement officer. The amount of any such fee shall be set by the municipality. The fee shall be
remitted to the municipality;
C. Keep a complete record of all essential transactions of the Office, including applications
submitted, permits granted or denied, variances granted or denied, revocation actions, revocation of
permits, appeals, court actions, violations investigated, violations found and fees collected. Ona
biennial basis, beginning in 1992, a summary of this record must be submitted by March 1 to the
Director of the Bureau of Land Quality Control within the Department of Environmental Protection;
and
D. Investigate complaints of alleged violations of local land use laws.
38 _ 442. Municipal failure to accomplish purposes (REPEALED)
38 _ 443. Cooperation (REPEALED)
38 _ 443-A. Cooperation; enforcement
1. Consultation with state agencies. All agencies of State Government shall cooperate to
accomplish the objectives of this article. To that end, the commissioner shall consult with the governing
bodies of municipalities and with other state agencies to achieve the purposes of this article, and shall
extend to municipalities all possible technical and other assistance for that purpose.
2. Legal actions. In any legal action in which the pleadings challenge the validity or legality of any
ordinance adopted pursuant to this article, the Attorney General shall be made a party until removed by
the Attorney General's consent.
3. Remedies. Any municipality which fails to adopt, administer or enforce zoning and land use
ordinances as required under this article shall be subject to the enforcement procedures, equitable
remedies and civil penalties set forth in sections 347 to 349.
38 444. Enforcement
Any person who orders or conducts any activity in violation of a municipal ordinance adopted under this
chapter is penalized in accordance with Title 30-A, section 4452.
14
The Attorney General, the district attorney or municipal officers or their designee may enforce ordinances
adopted under this chapter.
A public utility, water district, sanitary district or any utility company of any kind may not install services to any
new structure located in a shoreland area, as defined by section 435, unless written authorization attesting to
the validity and currency of all local permits required under this chapter has been issued by the appropriate
municipal officials or other written arrangements have been made between the municipal officers and the
utility.
38 444-A. Civil suit
1. Suit authorized. Any water utility, as defined in Title 35-A, section 102, may commence a civil
action for injunctive relief against an owner of property in the shoreland zone when the following
conditions are met.
A. A violation of a municipal shoreland zoning ordinance is alleged to have occurred.
B. The water utility bringing the civil action has a water supply that is directly affected by the alleged
violation.
2. Suit prohibited. An action may not be brought under this section if the Federal Government, State
Government or a municipality of the State has commenced and is pursuing an administrative, civil or
criminal action to remedy the alleged violation.
3. Notice. An action may not be commenced under this section unless the plaintiff has given at least
60 days' notice to the alleged violator, the department, the Attorney General, and the municipality or
municipalities in which the violation is alleged to have occurred. If the violation occurs within the
jurisdiction of the Maine Land Use Regulation Commission, the commission must be given notice in
place of the department and the municipality.
4. Jurisdiction. An action may be commenced in the District Court or Superior Court in the county in
which the violation is alleged to have occurred.
5. Intervention. The Attorney General may intervene in any case brought under this section.
38 _ 445. Guidelines for shoreland zoning along significant river segments
In addition to the guidelines adopted under section 438-A, the following guidelines for the protection of the
shorelands shall apply along significant river segments identified in section 437. These guidelines are
intended to maintain the special values of these particular river segments by protecting their scenic beauty
and undeveloped character.
1. New principal structures. New principal structures, except for structures related to hydropower
facilities, shall be set back a minimum of 125 feet from the normal high-water line of the river. These
structures shall be screened from the river by existing vegetation.
2. Newroads. Developers of new permanent roads, except for those providing access to a structure
or facility allowed in the 250-foot zone, shall demonstrate that no reasonable alternative route outside of
the zone exists. When roads must be located within the zone, they shall be set back as far as
practicable from the normal high-water line and screened from the river by existing vegetation.
3. New gravel pits. Developers of new gravel pits shall demonstrate that no reasonable mining site
outside of the zone exists. When gravel pits must be located within the zone, they shall be set back as
far as practicable from the normal high-water line and no less than 75 feet and screened from the river
by existing vegetation.
15
38 _ 446. Municipal ordinance review and certification
Each municipality with shorelands along significant river segments, as identified in section 437, shall review
the adequacy of the zoning on these shorelands to protect the special values cited for these river segments
by the Department of Conservation's 1982 Maine Rivers Study and for consistency with the guidelines
established under section 445. Prior to December 15, 1984, each such municipality shall certify to the Board
of Environmental Protection either that its existing zoning for these areas is at least as restrictive as the
guidelines established under section 445, or that it has amended its Zoning for this purpose. This
certification must be accompanied by the ordinances and Zoning maps covering these areas. Failure to
accomplish the purposes of this section results in adoption of suitable ordinances for these municipalities, as
provided for in section 438-A.
38 _ 447. Functionally water-dependent use zones
Municipalities are encouraged to give preference, when appropriate, to functionally water-dependent uses
and may extend zoning controls to accomplish this.
A municipality may, within coastal shoreland areas, adopt zoning ordinances for functionally water-
dependent uses. Municipalities may establish districts within these zones to give preference to commercial
fishing and other maritime activities.
In creating such a zone, a municipality shall consider the demand for and availability of shorefront property
for functionally water-dependent uses.
Zoning ordinances adopted or extended pursuant to this section shall be pursuant to and consistent with a
comprehensive plan.
38 _ 448. Municipalities establish commercial fishing and maritime activity zones
A municipality may, within coastal shoreland areas of that municipality, adopt zoning ordinances establishing
a commercial fishing and maritime activity zone. In creating that zone, the municipality shall consider at
least the following:
1. Utilization. The number of commercial fishermen and the utilization of the shoreland area;
2. Availability. The availability of shoreland area for commercial fishing;
3. Demand for property. The demands for shoreland property for commercial and residential
purposes not related to commercial fishing or maritime activity; and
4. Access. Access to the shore and availability of space appropriate for commercial fishing and
maritime activities.
38 _ 449. Shoreland zoning report to Legislature
The Commissioner of Environmental Protection shall biennially report to the Legislature on the
implementation and impact of local shoreland Zoning ordinances. The report shall include:
1. Commissioner assistance. A description of the assistance and supervision that the commissioner
has provided to the municipalities in carrying out their shoreland zoning responsibilities;
16
2. Summary of violations. A summary of the shoreland zoning violations investigated by municipal
code enforcement officers and related court actions; and
3. Recommendations. Where appropriate, any recommendations for legislation relating to shoreland
zoning.
PL 1997, ch. 748, sec. 7. Report; shoreland zoning, By January 15, 2003, the Department of
Environmental Protection shall submit a report to the joint standing committee of the Legislature having
jurisdiction over natural resources matters regarding compliance with the Maine Revised Statutes, Title 38,
section 439-A, subsection 4-A. The report must evaluate use of and compliance with the alternative
expansion provisions of that subsection and evaluate the environmental benefit of the provisions in
comparision with the measures permissible under Title 38, section 439-A, subsection 4.