Westport Island, Maine
· adopted 2006-11-07
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 9e3ce585a851 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of
WESTPORT ISLAND
in
Lincoln County, Maine
Site Plan Review Ordinance
Adopted November 7, 2006
Amended June 29, 2013
Amended June 22, 2024
TABLE OF CONTENTS
SITE PLAN REVIEW ORDINANCE OF THE TOWN OF WESTPORT ISLAND
SECTION 1- PURPOSE ............................................................................................................ 3
SECTION 2 - AUTHORITY ...................................................................................................... 3
SECTION 3 - APPLICABILITY... .......................................................................................... 3
SECTION 4 - ADMINISTRATION AND ADMENDMENTS... ........................................................... 5
SECTION 5 - ADMINISTRATIVE PROCEDURE - APPLICATION PROPOSAL PROCEDURE. 5
SECTION 6 - FINAL SITE PLAN APPLICTION REQUIREMENTS... ..................................................... 8
SECTION 7 - FINAL PLAN REVIEW AND APPROVAL ................................................................... 13
SECTION 8 - FEES... ................................................................................................................. 16
SECTION 9 - REVISIONS TO APPROVED PLAN... ................................................................................... 17
SECTION 10 - CRITERIA ......................................................................................................... 18
SECTION 11 - STANDARDS .................................................................................................... 20
11.A. - Water Supply and Ground Water Quality and Quantity. ................................ 20
11.B. - Sewage Disposal ............................................................................................... 24
11.C. - Soil Erosion and Sedimentation .......................................................................... 25
11.D. - Streets and Roads ............................................................................................ 26
11.E. - Site Clearing and Common Land .............................................................................. 29
11.F. - Storm Water Management... ............................................................................. 29
11.G.- Emergency Municipal Services... ............................................................................... 30
11.H. - Financial and Technical Capacity ............................................................................. 30
11.I. - Monuments ............................................................................................. 31
11.J. - Road Names and 911 Addresses ......................................................................... 31
11.K. - Surface Drainage ............................................................................................ 31
11.L. - Utilization of the Site ..................................................................................... 31
11.M.- Utilities ................................................................................................... 32
11.N. - Natural Features ............................................................................................. 32
11.O. - Harmful, Hazardous, Special and Radioactive Materials ..................................... 32
11.P.- Solid Waste Management... .................................................................................. 33
11.Q.- Dust, Gases, Odors and Radiation ....................................................................... 33
11.R.- Lighting ................................................................................................... 33
11.S. - Noise... .............................................................................................................. 33
11.T. - Facades... ......................................................................................................... 34
11.U. -Construction Standards....................................................................................... 34
11.V. -Signs... ............................................................................................................. 34
11.W.-Minumum Lot Standards... .................................................................................. 35
11.X.- Principal and Accessory Structures............................................................................ 35
SECTION 12 - INSPECTION AND ENFORCEMENT ........................................................................ 36
SECTION 13 - APPEALS... ...................................................................................................... 38
SECTION 14 - REVOCATION OF A PERMIT .................................................................................... 39
SECTION 15 - SEVERABILITY... .......................................................................................... 40
SECTION 16 - DEFINITIONS... .............................................................................................. 40
SECTION 1- PURPOSE
TOWN OF WESTPORT ISLAND SITE
PLAN REVIEW ORDINANCE
The Site Plan Review provisions set forth in this Ordinance are intended to protect the public health and
safety, promote the general welfare of the Town of Westport Island, and conserve the environment by
assuring that nonresidential construction is designed and developed in a manner consistent with the goals
and policies of the Town of Westport Island Comprehensive Plan, assuring that adequate provisions are
made for protection and conservation of the town's water supply and ground water; for adequate sewage
disposal; for preservation of the natural beauty and rural character; for traffic safety and access; for
emergency access; for management of storm water, erosion and sedimentation; for protection of the
environment, wildlife habitat, fisheries, and unique natural areas; and for protection of historic and
archaeological resources; while minimizing the adverse impacts on adjacent properties; and fitting the
project harmoniously into the fabric of the community.
SECTION 2 - AUTHORITY
This Ordinance is adopted pursuant to and consistent with the Town's Home Rule authority under 30-A
M.R.S.A. Section 3001 and Art. VIII, Pt. 2 Section 1 of the Maine Constitution.
SECTION 3 - APPLICABILITY
3.A. All Town of Westport Island Ordinances and Regulations apply, as appropriate and relevant¸ to
any project covered by this Site Plan Review Ordinance. Whenever a provision of this Ordinance
conflicts with or is inconsistent with another provision of this Ordinance or any other ordinance¸
regulation or statute¸ the more restrictive provision shall control.
3.B. A person who has right, title, or interest in a parcel of land must obtain Site Plan approval and
where appropriate, Subdivision Ordinance approval prior to commencing any of the following
activities on the parcel:
3.B.1. Obtaining a building or plumbing permit for the activities, or undertaking any
significant alteration or improvement of the site including grubbing or grading,
3.B.2. The construction or placement of any new building or structure including
accessory buildings and structures for nonresidential uses,
3.B.3. The expansion or relocation of an existing nonresidential building or structure
including accessory buildings or structures,
3.B.4. The expansion of an existing nonresidential use,
3.B.5. The conversion of an existing nonresidential use, in whole or in part, to another
nonresidential use,
3.B.6. The conversion of an existing building or structure, in whole or in part, from a
residential use to a nonresidential use,
3.B.7. The establishment of a new, or the expansion of an existing nonresidential use, even if
no buildings or structures are proposed, including, but not limited to, uses such as gravel pits¸
mineral extraction activities, cemeteries, golf courses, and other non structural use,
3.B.8. The conversion of an existing nonresidential building or structure, in whole or in part,
into one (1) or two (2) residential dwelling units,
3.B.9. The construction or expansion of paved areas or other impervious surface, including
walkways, access drives, and parking lots involving an area of more than two thousand five
hundred (2,500) square feet within any five (5) year period on nonresidential uses,
3.B.10. The resumption of a previously approved use that has been discontinued for a period
of five (5) years.
3.C. The following activities shall not require Site Plan approval:
3.C.1. The construction, alteration, or enlargement of a single family or two family
dwelling, including accessory buildings and structures,
3.C.2. The placement, alteration, or enlargement of a single or two family
manufactured home or mobile home dwelling, including accessory buildings and
structures on individually owned lots,
3.C.3. Agricultural activities, including agricultural buildings and structures, providing that
such activities do not produce objectionable odors at the property line beyond that of a typical
single family residence¸ and that such activity meets the requirements of Sections 11.A., B., C.,
F. and V.
3.C.4. Timber harvesting and forest management activities, providing that scenic buffers are
maintained on all property lines according to requirements of Section 11.N.,
3.C.5. The establishment and modification of home occupations,
3.C.6. Activities involving nonresidential buildings or activities that are specifically
excluded from review by the provisions of this section.
3.D. Non-conforming Enterprises
3.D.1. Enterprises which were in place at the time of the adoption of this Ordinance do not
require a Site Plan Review for pre-existing structures and uses,
3.D.2. Enterprises which were in place at the time of the adoption of this Ordinance are subject
to the provisions of 3.B. regarding expansion and changes in use,
3.D.3. Site Plan Reviews for Expansion to Enterprises which were in place at the time of the
adoption of this Ordinance will be restricted to the existing expansion unless the Planning Board,
determines that the expanded enterprise significantly impacts public health and safety, in which
case the Board's review of the pre-existing aspects of the enterprise will be confined to criteria
and standards associated with the public health and safety,
3.D.4. A non-conforming enterprise which is discontinued for a period exceeding one year, or
which is superseded by a conforming enterprise, may not again be devoted to a non-conforming
use except that the Planning Board may, for good cause shown by the applicant, grant up to one
year extension to that time period.
SECTION 4 - ADMINISTRATION AND AMENDENTS
4.A. The Town of Westport Island Planning Board shall be responsible for administering the
provisions of this Ordinance.
4.B. The Town of Westport Island Planning Board, hereinafter called the Board, is
authorized to review and act on all Site Plan Review Applications.
4.C. This Ordinance may be amended by majority vote of the Legislative Body of the Town of
Westport Island after a Public Hearing held by the Planning Board and the Board of Selectmen. Notice
of the hearing shall be posted at least fourteen (14) days prior to such hearing and advertised in a
newspaper of general circulation in the municipality at least two
(2) times with the date of first publication being at least fourteen (14) days prior to the hearing and
the second at least seven (7) days prior to the hearing
SECTION 5 - ADMINISTRATIVE PROCEDURE - APPLICATION PROPOSAL PROCEDURE
5.A. Pre-Application Meeting, Sketch Plan and On-Site Inspection
5.A.1. Purpose
The purpose of the Pre-Application Meeting and On-Site Inspection is for the applicant to
present general information regarding the proposed project to the Board and receive the Board's
comments prior to the expenditure of substantial sums of money on surveys, soils identification
and engineering.
5.A.2. Procedure
5.A.2.a. The applicant shall present a Pre-Application Sketch Plan.
5.A.2.b. The Board may ask questions and make suggestions, which may be
incorporated by the applicant into the application.
5.A.2.c. Following discussions on the Sketch Plan, the Board, on its own motion, or the
applicant may request that the Board conduct a Site Visit.
5.A.3. Submission
5.A.3.a. The Pre-Application Sketch Plan shall show in simple sketch form the proposed site
including layout of streets, lots, buildings, abutting properties and their principal use, and
other features in relation to existing conditions, the nature of the proposed use and potential
development and any issues or questions about other municipal ordinances and regulations.
The Sketch Plan, which does not have to be engineered and may be a free hand penciled
sketch, shall be supplemented with general information to describe the existing conditions
of the site and the proposed development. Topographical site conditions such as steep slopes,
wet areas and vegetative cover shall be identified in a general manner. The Sketch Plan shall
be superimposed on or accompanied by a copy of the assessor's map(s) on which the land is
located. The Sketch Plan shall be accompanied by:
5.A.3.a.i. A copy of a portion of the U. S. G. S. topographic map of the area
showing the outline of the proposed project.
5.A.3.a.ii. Copies of those portions of any county or town soil surveys and/or
hydrogeological studies covering the proposed project, showing the outline of the
proposed project.
5.A.3.a.lll. Areas to be contoured at greater than a five (5) foot contour interval on the
plan to be submitted in the final application shall be discussed and approved at the Pre-
Application meeting.
5.A.3.b. Any lot clearing or temporary road construction necessary to conduct any
assessments or tests necessary to support the application is subject to normal town
ordinances, regulations, and standards including, but not limited to, building permits,
written plans for temporary erosion and sedimentation control as well as permanent
stabilization measures following testing. The applicant may include a list of any such efforts
and a tentative schedule as to when they will commence especially if they deem it useful to
the review process to have representatives of the Board or other potential parties present
during the testing.
5.A.4. On-Site Inspection:
The purpose of the Pre-Application Site Visit is purely informational, for those involved in a
future review to understand more fully the Final Plans when submitted.
Prior to the On-Site Inspection, the applicant shall place "flagging" at fifty (50) foot intervals
along the approximate centerline of all proposed roads, parking areas and the corners of all
proposed structures. The applicant shall also locate the approximate frontage center of proposed
lots or structures with road frontage, or the approximate entrance location of any roads and
driveways proposed to provide access to non- frontage lots or structures. The Board shall not
conduct On-Site Inspections when there is more than one foot of snow on the ground.
5.A.5. Rights Not Vested
The Pre-Application Meeting, the submittal or review of the Sketch Plan or the On-Site
Inspection shall not be considered the initiation of the substantive review process for the
purposes of bringing the proposed project under the protection of Title 1 M.R.S.A. Section
302.
5.B. Final Plan Application
5.B.1. Within six (6) months after the Pre-Application Meeting, the applicant shall
submit an application for approval of a Final Plan (see Section 6 for a list of items
required).
If an applicant cannot submit the Final Plan within six (6) months, the applicant may request an
extension. Such a request for an extension to the filing deadline shall be filed, in writing, with
the Board prior to the expiration of the filing period. In considering the request for an extension,
the Board shall make findings that the applicant has made due progress in preparation of Final
Plans and in pursuing approval of those Final Plans before other agencies, and that municipal
ordinances or regulations which may impact on the proposed development have not been
amended. After six (6) months from the date of the Pre-Application Meeting, if an extension has
not been requested and approved by the Board, the applicant must begin a new application
process starting with a request for a Pre-Application Meeting. (Section 5.A.)
5.B.2. At the meeting where the Final Plan is presented, the application shall note: 1) any
requirements of the application which are not applicable or for which a waiver is requested, and
2) any criterion or standard which is not applicable and therefore not addressed. An acceptable
reason for requesting a waiver of a requirement, criterion or standard would be that the proposed
enterprise will have no greater adverse impact than a single family residence. The Board shall
vote to consider the applicant's request to assert such positions at the public hearing. The Board
shall prepare written findings to document all decisions regarding waiver requests.
Based on all materials presented and decisions regarding requests for waivers or non applicability
of a requirement, criterion or standard, the Board shall vote as to whether the application is
complete. The Board shall notify the applicant in writing within thirty
(30) days of the Board's determination that the application is complete. If the application is
deemed not complete, the Board shall notify the applicant in writing within thirty (30) days of
its decision, as to what specific additional materials are needed to declare the application
complete.
5.B.3. The Board shall consult experts as they deem necessary in their deliberations, providing
that the Board only select such experts that have been previously discussed with the parties. The
Board may require the owner or the owner's agent to deposit in escrow an amount of money
sufficient to cover the costs of any professional review and/or consultation of the Final Site Plan
Review application, which the Board may feel is reasonably necessary to protect the general
welfare of the Town of Westport Island.
Maximum amounts for this escrow payment are to be established by the Board of Selectmen. This
escrow payment shall be made to the Town Treasurer before the Board engages any outside party
to undertake the review and to make recommendations to the Board. Payments made from this
escrow account shall be requested by the Planning Board and authorized by the Board of
Selectmen. Any part of this escrow payment in excess of the final costs for review shall be
returned to the owner or the owner's agent.
SECTION 6 - FINAL SITE PLAN APPLICATION REQUIREMENTS
The Final Plan shall include or be accompanied by the following information:
6.A. General Information
6.A.1. Record owner's name, address and phone number and applicant's name, address and phone
number of the applicant, if different,
6.A.2. Proposed name of the enterprise or identifying title. A general description of the
proposed use, purpose or nature of the enterprise and the projected cost of the development of
the project,
6.A.3. Names and addresses of all property owners abutting the parcel(s) involved, and also
those property owners within one thousand (1000) feet of any and all property boundaries,
along with the principal use of each property,
6.A.4. Sketch map showing general location of the site within the municipality based upon
the tax maps,
6.A.5. Boundaries of all contiguous properties under the total or partial control of the owner
or applicant regardless of whether all or part is being developed at this time,
6.A.6. The tax Map and Lot number of the parcel or parcels on which the project is
located,
6.A.7. A copy of the deed to the property, an option to purchase the property or other
documentation to demonstrate right, title or interest in the property on the part of the
applicant,
6.A.8. The name, registration number, and seal of the person(s) who prepared the plan and all
licensed professionals who contributed to the elements of the plan, if applicable,
6.A.9. Evidence of the applicant's technical and financial capability to carry out the
project as proposed.
6.B. Final Plan and Backup Documentation
A Final Plan consisting of one or more maps or drawings drawn to a scale of not more than one
hundred (100) feet to the inch. Final Plans for enterprises with associated parcels containing more than
one hundred (100) acres may be drawn at a scale of not more than two hundred (250) feet to the inch,
provided all necessary detail can easily be read. Final Plans shall be no larger than twenty-four (24)
inches by thirty-six (36) inches in size, and shall have a margin of two (2) inches outside of the
border on the left side for binding and a one (1) inch margin outside the border along the remaining
sides. Space shall be reserved on the Final Plan for endorsement by the Board. The Final Plan should
contain the following information:
6.B.1. Existing Pre Development Conditions
The following items listed below should be presented in detail and also to the maximum extent
possible, represented on a map or maps (drawing or drawings) referred to as "Map 1 - Existing
Conditions". This map and additionally required materials should be part of Final Plan
Submission.
6.B.1.a. Zoning classification(s), including overlay and/or sub-districts, of the property
and the location of zoning district boundaries if the property is located in two (2) or more
districts or sub-districts or abuts a different district.
6.B.1.b. A standard boundary survey of the parcel(s) involved, giving complete descriptive
data by bearing and distance including the number of acres within the parcel(s) associated
with the proposed enterprise, location of property lines, existing buildings, vegetative cover
type, watercourses and other essential existing physical features, developed and certified by a
Professional Land Surveyor. The Existing Conditions Map shall indicate the type of
monuments found at each lot corner.
6.B.1.c. Contour lines at not more than five (5) foot intervals, or at the interval specified
by the Board, showing elevations in relation to mean sea level. Appropriate elevations must
be provided as necessary to determine the direction of the flow.
6.B.1.d. Location and size of any existing sewer and water mains, culverts and drains, on-
site sewage disposal systems, wells, underground tanks or installations, power and telephone
lines and poles on the property to be developed, on abutting roads, or land that may serve
the development. The Fire Chief shall be notified of the location or proposed location of
any underground propane tanks
6.B.1.e. Location, names and present widths of existing public and/or private roads and
rights-of-way within or adjacent to the proposed development.
6.B.1.f. The location, dimensions (horizontal and vertical) including ground floor
elevation of all existing buildings on the site.
6.B.1.g. The location and dimensions of existing driveways, parking and loading areas,
walkways and sidewalks on or immediately adjacent to the site.
6.B.1.h. Location of intersecting roads or driveways within two hundred (200) feet of the
site.
6.B.1.i. The location of rivers, streams, brooks, open drainage courses, wetlands, stone walls,
graveyards, fences, stands of trees, and other important or unique natural areas and site
features, including but not limited to, deer wintering areas, significant wildlife habitats,
fisheries, scenic areas, habitat for rare and endangered plants and animals, unique natural
communities and natural areas, sand and gravel aquifers, the location of any trail, trail
system or greenbelt that crosses the property and historic and/or archaeological resources,
together with a description of such features. Wetlands boundaries need to be delineated by a
Certified Professional Wetlands Scientist.
6.B.1.j. The direction of existing surface water drainage across the site.
6.B.1.k. The location, front view, dimensions and lighting of existing signs.
6.B.1.l. Location and dimensions of any existing easements and copies of existing
covenants or deed restrictions.
6.B.1.m. The location of the nearest fire hydrant, dry hydrant or other water supply for fire
protection.
6.B.1.n. If any portion of the parcel(s) involved is in a flood prone area, the
boundaries of any flood hazard areas and the 100 year flood elevation shall be
delineated.
6.B.2. Proposed Development
The following items listed below should be presented in detail and also to the maximum extent
possible, represented on a map or maps (drawing or drawings) referred to as "Map 2 - Proposed
Development Activity". This map and additional required materials should be part of the Final
Plan Submission.
6.B.2.a. The type of water supply and sewage disposal systems to be employed and the
location of all test sites for water supply and sewage disposal and any related structures.
6.B.2.a.i. A water usage estimate prepared in accordance with Section 11.A.1. by a
Certified Geologist or Registered Professional Engineer experienced in hydrogeology,
including estimated demand for water together with the design, location, and
dimensions of all provisions for water supply, and certified evidence of their adequacy
for the proposed use as described in Section 11.A.1.
For estimated well water usage exceeding threshold levels specified in Section
11.A.2. a hydrogeological assessment including acceptable results of a 72 hour well pump
test as described in Section 11.A.2. and associated erosion and sedimentation control
plans for before, during and after the tests are required.
6.B.2.a.ii. Estimated demand for sewage disposal together with the design, location and
dimensions of all provisions for wastewater disposal and certified evidence of their
adequacy for the proposed use as described in Section 11.B. including soils test pit data if
on-site sewage disposal is proposed. If a private sewage disposal system is proposed,
location and results of tests to ascertain subsurface soil ground water conditions and
depths to maximum ground water level. An approved sewage disposal site or sites
determined by a State of Maine Licensed Site Evaluator or a Soils Engineer shall be a part
of the requirements. A completed HHE 200 form, approved and signed by the Local
Plumbing Inspector must be submitted with the application. For estimated sewage
disposal over 500 gallons per day, certified approved backup systems as applicable under
standards Section 11.B. shall be included.
6.B.2.b. The direction of proposed surface water drainage across the site and from the site,
with an assessment of impacts on downstream properties shall be included, as well as the
location and size of existing and proposed sewers, water mains, culverts and drainage ways on
or adjacent to the parcel(s) associated with the enterprise.
6.B.2.c. Provisions for handling all solid wastes, including hazardous and special wastes
and the location and proposed visual screening of an on-site collection of storage
facilities.
6.B.2.d. The location, dimensions, and materials to be used in the construction of proposed
driveways, parking and loading areas, and walkways and any changes to traffic flow onto
or off-site.
6.B.2.e. A detailed description of all enterprise airborne emissions and control methods
employed to meet the appropriate standards of this Ordinance.
6. B.2.f. The locations, dimensions and ground floor elevations of all buildings or building
expansions proposed on the site.
6.B.2.g. The location of all utilities, including fire protection systems.
6.B.2.h. A complete set of any architectural or construction drawings to be
employed in the construction or modification of any enterprise structures.
6.B.2.i. A description of the methods to be used to harmonize the enterprise into the rural
and residential character of the surrounding neighborhood including:
Proposed landscaping and buffering.
Location, front view, materials, and dimensions of proposed signs, together with the
method for securing the signs,
Location and type of exterior lighting, Facades.
6.B.2.j. The dimensions and location of any proposed roads, parking areas, driveways, public
improvements or common areas shown upon the official map and the Comprehensive Plan, if
any, within the parcel(s) associated with the enterprise. Road names and lines, pedestrian
ways, lots, easements, and areas to be reserved for public use shall also be shown upon the
official map.
6.B.2.k. The 911 Officer or Deputy shall determine that road names chosen are not similar in
sound or designation to other roads on Westport Island or in neighboring communities.
Boundaries of all undeveloped lots and proposed driveways shall be designated by staking to
facilitate the 911 Officer's or Deputy's determination of 911 addresses for each lot.
6. B.2.l. Any analyses, reports, etc. required to support adherence to a standard or to
demonstrate compliance with a criterion, and the names and addresses of any individuals or
organizations and credentials thereof, who prepared and/or certified them.
6.B.2.m. An erosion and sedimentation control plan in conformance with Section 11.C.
6.B.2.n. The applicant shall submit information on the location of the development to the
following address to determine if the enterprise has any negative impact on historic areas:
State Historic Preservation Officer Maine
Historic Preservation Commission 55 Capitol
Avenue
State House Station 55
Augusta, Maine 04333
The information submitted above shall include a request that the Westport Island Planning
Board be notified of any comments. The applicant shall submit to the Board proof of such
notification, including a copy of the letter to the State Historic Preservation Officer.
6.B.2.o. An estimate of the amount and type of vehicular traffic to be generated on a daily
basis and at peak hours, and the sight distances for each proposed road and
driveway that intersects an existing or proposed public or private road. Road and Street Plans
consistent with Road and Street Standards, Section 11.D. shall be required. Trip generation
estimates shall be consistent with methods recommended in the latest edition of "Trip
Generation", published by the Institute of Transportation Engineers.
6.B.2.p. A detailed layout of all parking lots and parking spaces consistent with standards in
Section 11.D. For enterprises with more than 30 parking spaces or that will generate more than
100 vehicle trips per day, a traffic impact analysis prepared by a Registered Professional
Engineer with expertise in traffic engineering shall be required. The analysis shall indicate the
expected average daily vehicular trips, peak hour volumes, access conditions at the site,
distribution of traffic, types of vehicles expected¸ effect upon the level of services on the road
giving access to the enterprise and neighboring roads that may be affected, and recommended
improvements to maintain the desired level of service on the affected roads.
6.B.2.q. The Final Plan shall include final designs of any bridges, or culverts and
drainage ways, which may be required on or adjacent to the property to be
developed.
6.B.2.r. A time phased project plan including:
1) A complete list of facilities and construction items proposed and to be completed
by the applicant prior to the applicant's preferred dates for occupation of the
premises and commencing enterprise operations, with the proposed date for
completion of each listed facility or item,
2) A time phased complete list of all facilities and construction items proposed to be
completed after the preferred date for commencement of enterprise operations,
3) The milestones in the project where certified notice of completion will be
provided to the Board.
6.B.2.s. A Storm Water Management Plan in accordance with the requirements of
Section 11.F.
6.B.2.t. Description of permanent reference monuments in accordance with Standards
Section 11.I. and their location noted and referenced "X" on the Final Plan.
SECTION 7 - FINAL PLAN REVIEW AND APPROVAL
7.A. Final Plan
7.A.1. Projects subject to State Review
If the proposed project requires a permit under the Site Location of Development Act, the
Storm Water Management Law or the Natural Resources Protection Act or is
otherwise under the jurisdiction of the Maine Department of Environmental Protection or
Transportation, the Final Plan shall not be executed until all such approvals are obtained. See
Section 7.B. The applicant shall submit any conclusions of law and findings of fact to the
Board, and all recognized parties. The Board may consider them in formulating its own
Findings of Fact and Conclusions of Law.
7.A.2. Final Plan Procedure
7.A.2.a. All public hearings for Site Plan Reviews brought before the Planning Board shall be
recorded by electronic means and the recording filed with the Town Clerk of Westport
Island.
Any party with the consent of the Chair of the Planning Board may arrange for a court
reporter to be present at a hearing. All costs incurred are the responsibility of the requesting
party. If a written transcript is produced, a single copy is to be provided to the Board.
Rights to the transcript remain the property of the party producing it. Copies may only be
obtained from that party following agreement of the payment of a reasonable
proportionate share of the cost of producing it.
7.A.2.b. When an application is filed with the reviewing authority, the applicant shall
file a notice of application by first class mail to all abutting land owners, notifying them of
their party status. The filed application shall include certification that the above notice has
been made. The reviewing authority shall give the applicant a dated receipt for the filing of
the application.
Within thirty (30) days of the receipt of the application, the applicant shall be notified if
the application is deemed to be complete or not complete. A hearing which may include an
On-Site Inspection, shall be held within thirty (30) days of the determination that the
application is complete. Notice of this hearing shall be given to the applicant and published
two (2) times in local newspapers. The date of the second publication must be at least seven
(7) days before the hearing. The Board may request that the Fire Chief, Road Commissioner or
Local Plumbing Inspector comment either at the public hearing or in writing to all statutory
parties prior to the hearing, upon the adequacy of their departments' existing capital facilities
to service the proposed enterprise. The applicant shall be responsible at any hearings held by
the Board for answering any questions about the project, and providing information relative
to the application.
7.A.2.c. At the public hearing the Chairman of the hearing shall review requests for party
status, granting status for those who meet the standards for party status under Maine Land
Use Law. Non-statutory parties may be granted full or selective status for certain criteria,
based solely upon a demonstration of potential impacts upon their properties under specific
criteria. All decisions on non-statutory party status shall be by vote of the Board.
All testimony shall be sworn and the Chair shall administer the oath individually to each person
who wishes to present testimony.
The Chair shall request testimony upon each criterion and standard contained in this
Ordinance. The applicant has the burden of proof and will present information as required to
show that the requirements of the criterion and/or standard are met, or offer an alternative
and provide evidence that the proposed alternative meets the spirit and requirements of the
criterion or standard. If the Board previously allowed the applicant to request a waiver of a
requirement, criterion or standard, the applicant has the burden of proof to provide
information to show that the proposed enterprise will have no greater adverse impact than a
single family residence in that regard. Following the applicant's presentation of evidence
intended to show that the proposed enterprise will conform with each specific criterion and
each specific standard or to request a waiver as described above, the burden of proof with
regard to that criterion or standard shifts to the other parties present. An admitted party
may then present evidence as to whether the applicant has satisfied the criterion or standard.
After all testimony and evidence, arguments and rebuttals have been heard, the Board shall
decide by vote whether the applicant has met the burden of proof and has satisfied each
criterion and/or standard.
7.A.2.d. Within thirty (30) days from the date of completion of the public hearing,
the Board shall issue an order denying, approving, or approving with conditions the
application. If the Board finds that all the criteria and standards cited above have been met,
it shall vote to approve the application. If the Board finds that any of the criteria or
standards cited above have not been met, the Board shall either deny the application or
approve the application with conditions to ensure the intent of all of the criteria and
standards will be met by the proposed enterprise. The Board shall issue conclusions,
findings of fact and conditions in writing specifying its reasons for approval, conditional
approval or disapproval, which shall be provided to the applicant and all admitted parties.
The Board shall require the
applicant to record all conclusions of law, findings of fact and conditions in the Office of the
Town Clerk of Westport Island simultaneously with the filing of the approved Final Plan at
the same Office. The decision of the Board relative to the Final Plan shall be considered the
appealable decision of the Planning Board.
7.B. Final Plan Filing Approval
Within six (6) months of the Final Plan Approval, at a regular meeting of the Planning Board, the
applicant shall submit two (2) complete sets of the Final Plan Filing, which shall include any
revisions agreed to at the Final Plan Approval, and all other required recordable documents
(including but not limited to, Findings of Fact, Conclusions of Law and conditions) and all items
listed in Section 7.B.1. One (1) set is to be filed at the Office of the Town Clerk of the Town of
Westport Island and the second set is to be for the applicant's record.
The Final Plan drawings and maps of the Final Plan Filing shall consist of reproducible, stable-
based transparencies.
7.B.1. The Final Plan Filing shall include the following:
7.B.1.a. All of the information outlined in Section 6.
7.B.1.b. The name, registration number and seal of the Land Surveyor or Engineer or
Planning Consultant who prepared the Plan.
7.B.1.c. All Findings of Fact and Conclusions of Law including conditions of
approval, if any, required by the Board.
7.B.1.d. A statement indicating that any change or modification to any aspect of the
approved Plan shall be considered an amendment to the Plan and shall require approval of
the Board.
7.B.1.e. A signed statement verifying that all necessary State approvals have been obtained
including Findings of Fact issued with those approvals.
7.B.2. The Board shall review the Final Plan, and all recordable documents to insure consistency
with agreements/conditions/covenants set forth at the Final Plan approval, and if they are
complete and consistent, the Board shall sign the Final Plan.
If the Board determines that changes have been made beyond those agreed to or required by
conditions of the Final Plan Approval, they will follow the procedure described in Section 9.
"Revisions to Approved Final Plan".
7.B.3. No changes, erasures, modifications, or revisions shall be made in any Final Plan after
approval has been given by the Board and endorsed by the signatures of the Board members on
the Final Plan.
7.B.4. The approval by the Board of a Final Plan shall not be deemed to constitute or be evidence
of any acceptance by the municipality of any road, easement, or any open space include in such
Final Plan.
SECTION 8. - FEES
8.A. Applications All applications for Final Plan of a Site Plan Review shall be accompanied by a fee
to be determined by the Board of Selectmen and posted on the Fee Schedule at the Town Office. In
addition, as provided for in Section 5.B.3. the applicant shall pay reasonable review costs incurred by
the municipality, including but not limited to, review of the Application by subject experts or by
legal counsel. A tentative budget for such review and counsel shall be discussed and agreed to by the
Applicant prior to the filing of the Application.
Fees for Revisions to Approved Final Plan shall be determined by the Board of Selectmen and posted
on the Fee Schedule at the Town Office. Such fees shall recover the town's costs to review and
administratively process the Revision.
8.B. The Board of Selectmen shall establish and make available to the public, a Fee Schedule for
ongoing periodic enterprise inspections as specified in Standards Section 11. of this Ordinance.
Such fees shall be set forth to recover Town's costs of administering the inspection process. The Fee
Schedule shall be posted at the Town Office.
SECTION 9 - REVISIONS TO APPROVED FINAL PLAN
9.A. Procedures
9.A.1. An applicant for a review to a previously approved Final Plan shall, at least ten
(10) days prior to a scheduled meeting of the Board, request to be placed on the Board's agenda.
If the revision involves major departures from the plans previously approved, the procedure for
Final Plan approval shall be followed. If the revision involves only minor modifications of the
approved Final Plan, the Board may vote to approve the Revised Final Plan at that meeting, or
may, because of the nature of the revisions, vote to use some or all of the procedures for Final Plan
approval. For all Board decisions regarding proposed revisions, the Board shall make Findings of
Fact and Conclusions of Law and/or conditions as to those decisions. For all approved revisions,
with or without conditions, the Board's Findings shall state that the Revised Final Plan meets the
criteria and standards of this Ordinance. Issuance of Findings of Fact and Conclusions of Law, and
conditions, if applicable, shall be in no more than thirty (30) days from the decision. The
Applicant assumes the risk of proceeding with the revised project until the revision is approved.
9.A.2. If at any time during the construction of the required improvements it is
demonstrated to the satisfaction of the Code Enforcement Officer and/or Local Plumbing
Inspector that unforeseen conditions make it necessary or preferable to modify the location
or design of any required improvement, the Code Enforcement Officer and/or the Local
Plumbing Inspector may, authorize minor modifications,
provided these modifications are within the spirit and intent of the Board's approval and do not
extend to the waiver or substantial alteration of the function of any improvements required by
the Board. The Code Enforcement Officer shall issue any authorization under this section in writing
to the Board. The Board may require the filing of a Revised Final Plan depending on the extent
of the modification.
9.B. Scope of Review
The Board's scope of review under Section 9.A.2. and the Code Enforcement Officer and/or the
Plumbing Inspector's review under Section 9.A.2. shall be limited to those portions of the Final Plan
which are proposed to be changed. All Findings of Fact and authorizations shall be filed in the Town
Office.
SECTION 10. - CRITERIA
10.A. When reviewing any proposed Site Plan Review Application for approval, the Board shall
determine whether the proposed enterprise meets the following criteria. The proposed enterprise:
10.A.1. Will not result in undue water or air pollution. In making this determination the
Planning Board shall consider: the elevation of land above sea level and its relation to the flood
plains; the nature of the soils and subsoils and their ability to adequately support waste disposal;
the slope of the land and its effect on effluents; the availability of streams for disposal of
effluents; and the applicable State and Local health and water resources rules and regulations;
10.A.2. Has sufficient water available for the reasonably anticipated needs of the
enterprise;
10.A.3. Will not cause an unreasonable burden on an existing water supply, if one is to be
used;
10.A.4. Will not cause unreasonable soil erosion or reduction in the land's capacity to hold
water so that a dangerous or unhealthy condition results;
10.A.5. Will not cause unreasonable highway or public road congestion or unsafe
conditions with respect to use of the highways, public roads or roads necessary for access
to or within the proposed enterprise;
10.A.6. Will provide for adequate solid and sewage waste disposal;
10.A.7. Will not cause an unreasonable burden on the ability of the Town of Westport Island
to dispose of solid waste and sewage with respect to the use of municipal facilities existing or
proposed;
10.A.8. Will not place an unreasonable burden on the ability of the Town of Westport Island
to provide municipality or government services;
10.A.9. Will not have an undue adverse effect on the scenic or natural beauty of the area,
aesthetics, historic site, significant wildlife habitat or rare and irreplaceable natural areas or any
public rights for physical or visual access to the shoreline.
10.A.10. Conforms to the Subdivision Ordinance, Comprehensive Plan, Floodplain Management
Ordinance, Shoreland Zoning Ordinance, Building Code Ordinance, and any other duly adopted
Town Ordinance or Regulation. In making this determination, the municipal review authority
may interpret these Ordinances and any other applicable Regulations.
10.A.11. Has the adequate financial and technical capacity to complete the project while
meeting the criteria and standards of this and any other applicable Ordinance.
10.A.12. Will not adversely affect, whenever situated entirely or partially within the
watershed of any pond or lake or within 250 feet of any wetland, pond, lake, river, or tidal
waters as defined in the Mandatory Shoreland Zoning Act, Title 38, chapter 3, subchapter 1,
article 2-B, the quality of each body of water or unreasonably affect the shoreline of such
body of water.
10.A.13. Will not, alone or in conjunction with existing activities, adversely affect the
quality or quantity of ground water.
10.A.14. If any part of the proposed enterprise is in a flood prone area, shall determine the 100
year flood elevation and flood hazard boundaries within the parcel(s) and include a condition of
Final Plan Approval requiring that the principal structures in the enterprise will be constructed
with their lowest floor, including the basement, at least one foot above the 100 year flood
elevation.
10.A.15. Has identified all freshwater wetlands on any maps submitted as part of the
application, regardless of the size of these wetlands.
10.A.16. Has identified on any maps submitted as part of the application, any river, stream or
brook as defined in the Natural Resources Protection Act, Title 38, Section 480-B, within or
abutting the proposed enterprise.
10.A.17. Will provide for adequate storm water management.
10.A.18. Will not cause an unreasonable burden on the ability of the municipality to
provide emergency services.
10.A.19. Will fit harmoniously into the rural and residential character as described in the
Town of Westport Island Comprehensive Plan.
10.A.20. Will provide for safe handling of all materials and chemicals utilized on the site.
10.A.21. Will provide for safe disposal of all waste materials generated on the site,
minimizing the probability of accidental discharge to the environment.
10.A.22. Will provide a proposed time-phased project plan for the completion of facilities
and construction items and the proposed dates for occupancy of the premises and
commencement of enterprise operations and show how this plan provides for adequate public
health and safety.
10.A.23. Will not produce dust, fumes, odors, gases, light or radiation at the lot lines, any
greater than that produced by an average single family residence as determined by the Planning
Board.
SECTION 11. - STANDARDS
The following Standards are in addition to the requirements of the Town of Westport Island Criteria,
(Section 10). Compliance with these Standards may be used to show partial or full compliance with the
requirements of the associated judgemental criteria. The following Standards are intended to protect the
general welfare of the Town of Westport Island in keeping with the Comprehensive Plan. They are
intended to influence the development of enterprises that have potentially greater adverse impact than a
single family residence.
11.A. Water Supply and Ground Water Quality and Quantity
11.A.1. Water Supply
11.A.1.a. When a proposed enterprise's water supply shall be from wells:
i. A detailed estimate of water usage by the enterprise must be developed by a Licensed
Professional Engineer as part of the required review (average daily usage calculations
required for each week throughout the year).
ii. Individual wells shall be sited on the Final Plan and shall be sited at the approved
location. Alternate locations may be approved by the Board upon request.
iii. Lot design shall permit placement of wells, subsurface wastewater disposal areas, and
where necessary, reserve sites for subsurface wastewater disposal areas in full
compliance with the Maine Subsurface Wastewater Disposal Rules and the Well
Drillers and Pump Installers Rules.
11.A.1.b. If a central waste supply system is provided by the applicant, the location and
protection of the source, the design, construction and operation of the system shall conform
to all pertinent Maine standards, including the Maine Rules Relating to Drinking Water (10-
144 A.C.M.R. Section231). An assessment detailing the design, operation and location of the
proposed central water supply system, including the long term capacity and endurance of the
source of water supply, must be provided and certified by a Registered Professional Engineer.
11.A.2. Hydrogeological Assessment
11.A.2.a. When a proposed enterprise's water supply shall be from wells, and if the area of
the whole parcel being proposed for the enterprise is less than five (5) acres and the estimated
peak week water usage is greater than three hundred (300) gallons per day¸ of if the area of
the whole parcel being proposed for the enterprise is greater than five (5) acres and the
estimated peak week water usage of the enterprise is greater than four hundred (400) gallons
per day, or if potential growth in the enterprise could result in water usage greater than four
hundred (400) gallons per day, a hydrogeological assessment including a seventy-two (72)
hour pump test¸
coordinated and prepared by a Certified Geologist or Registered Professional Engineer is
required.
Unless the applicant requests in writing and receives a waiver from the Board to not require
certain components of the assessment, a hydrogeological assessment requires all of the
following information:
i.
Detail of the overall design and layout of the water supplies and sewage
disposal systems and showing compliance as appropriate with Section
11.A.1.a. and b. above, and also the Maine Rules Relating to Drinking Water (10-
144 A.C.M.R. 231).
ii. A seventy-two (72) hour (minimum) pump test on all wells to be utilized by the
site. The test is described below:
1) The applicant and the certifying agent must prepare an estimate of the average
water usage (average water usage calculation for each week throughout the
year).
2) All wells to be utilized will be dug and pumped at maximum sustainable rates for
seventy-two (72) hours. Maximum sustainable pump rate at the end of the test must
exceed the highest estimated weekly usage in section i above. Before, during and
after the seventy-two (72) hour test, the level of nearby streams, ponds, and water
supplies on properties within 1500 feet must be monitored and shown not to be
adversely impacted by the test. If such monitoring is not possible, a request for
waiver of this requirement must be made to the Planning Board sixty (60) days
prior to the actual testing, and the Planning Board must approve the request for
waiver prior to test commencement. The waiver request must discuss the reasons
that such monitoring cannot be conducted and describe what methods in the test to
assure that the effects on adjacent water supplies will not be adverse. Water
samples of all water supplies in the test, both before and after the seventy-two (72)
hour test, must be taken and submitted to an independent certified lab for analysis.
The test will be conducted by a Licensed Professional Engineer and a complete
report of the test, including the laboratory analysis, will be submitted with the Plan.
This report shall include an assessment of the adequacy of the proposed overall
water management system design (water supply, sewage disposal, ground water
preservation and storm water management), as compared to the State of Maine
standards and to currently good practice for islands similar to Westport Island, as
determined by the Planning Board of Westport Island. In addition, the analysis and
evaluation shall include the following:
a) A statement that the enterprise will have no adverse impact on the quality
and quantity of ground water resources available on the parcel in question
and on properties abutting the parcel.
b) An estimate of the maximum daily water usage of the proposed water supply
system without adverse effect on quality and quantity of ground water
resources available on the parcel in question and on properties abutting the
parcel. This limit shall be placed on the deed(s) of all lots within the parcel.
c). Any lot clearing or temporary road construction necessary to conduct the
drilling and testing are subject to normal town standards including
building permits and a written plan for temporary erosion and
sedimentation protection as well as permanent stabilization measures to
follow after testing, regardless of the test result. A copy of the erosion and
sedimentation plan for areas impacted by the seventy-two (72) hour test will
accompany the test report as part of the Site Plan submission.
iii. A map showing the basic soils types.
iv. The depth to the water table at relevant points throughout the parcel(s) involve.
v. Drainage conditions throughout area to be developed in the enterprise.
vi. Known data on the existing ground water quality and quantity in the area.
vii. A map showing the location of any subsurface wastewater disposal systems and drinking
water wells within the parcel(s) and within two hundred (200) feet of the parcel(s)
boundaries.
viii. An analysis and evaluation of the effect of the enterprise on ground water resources.
In the case of residential developments, the evaluation shall, at a minimum, include a
projection of post development nitrate-nitrogen concentration at any wells within the
parcel(s) of the enterprise and at their boundaries.
ix. Projections of ground water quality and quantity shall be based on the
assumption of drought conditions (assuming 60% of normal average precipitation).
x. No enterprise shall increase any contaminant concentration in the ground water at any on
site well or at the enterprise boundary to more than the Primary Drinking Water Standards.
No enterprise shall increase any contaminant concentration in the ground water at any on site
well or at the enterprise boundary to more than the Secondary Drinking Water Standards.
xi. If ground water contains contaminants in excess of the primary standards, and the
enterprise is to be served by on site ground water supplies, the applicant shall demonstrate
how water quality will be improved or treated to comply with standards.
xii. If ground water contains contaminants in excess of the secondary standards, the enterprise
shall not cause the concentration of the parameters in question to exceed 150% of the ambient
concentration.
xiii. Any waiver granted by the Board must be based on clear evidence provided by the
applicant that circumstances unique to the parcel proposed for the enterprise justify the
waiver of a component of the assessment and pose no threat to public health and safety.
xiv. Subsurface wastewater disposal systems and drinking water wells shall be constructed
as shown on the map submitted with the assessment. If construction standards for drinking
water wells or other measures to reduce ground water contamination and protect drinking
water supplies are recommended in the assessment, those standards shall be included as a
note on the Final Plan, and as restrictions in the deeds to the affected lots.
11.A.2.b. If the whole area of the parcel(s) being proposed for the enterprise is greater than
five (5) acres and if the peak week estimated water usage of the enterprise, at present and in the
future, is less than 500 gallons per day¸ normal state and local requirements apply to the
enterprise development project. An inspection of the water and sewage disposal systems by the
Local Plumbing Inspector shall be conducted at three (3) year intervals to confirm peak week
usage and flow rates remain below the five hundred (500) gallons per day flow rate threshold.
The Local Plumbing Inspector may require the enterprise to install a water meter and initiate
a monitoring schedule or other method to determine if an expansion of use has occurred.
11.A.2.c. A water meter shall be installed to monitor usage for any enterprise with
estimated peak week usage greater than five hundred (500) gallons per day or where water is
an input requirement of the operating process of the enterprise.
Water Usage shall be monitored by the enterprise and inspected and certified as consistent
with the originally estimated usage by the Local Plumbing Inspector on a schedule to be
established by the Local Plumbing Inspector and approved by the Board. This schedule shall
be noted on the Final Plan.
The enterprise is responsible for insuring inspections are accomplished on schedule and keeping
the water meter fully functional. Failure to comply shall be a violation and subject to
penalties as determined by the Board of Selectmen for non compliance, and legal actions to
cease or minimize enterprise operations until full functionality is restored.
Actual peak water usage rates greater than 20% or more than the previously approved estimate to
a level greater than 500 gallons per day shall trigger a new site plan review as an Expansion of
the Enterprise (See Section 12.E.).
11.B. - Sewage Disposal
A detailed estimate of sewage flow and chemical analysis of effluent generated by the enterprise must
be developed by a State of Maine Licensed Professional Engineer as part of the required review. (average
daily sewage flow calculations required for each week throughout the year.)
If the sewage flow of the new or expanded use under this Ordinance is subsurface and to be shared with
the flow of another separate use, under the same or different ownership, the estimate of sewage flow
and effluent analysis must be combined to include all uses.
11.B.1. Sewage disposal shall be private subsurface wastewater disposal systems or a private
treatment facility.
11.B.2. The applicant shall submit evidence of site suitability for subsurface sewage disposal
prepared by a Maine Licensed Site Evaluator/Soil Scientist to be in full compliance with the
requirements of the State of Maine Subsurface Wastewater Disposal Rules.
11.B.2.a. This evidence may include a test pit log showing the results of an analysis
demonstrating suitability for subsurface sewage disposal or a high intensity soil survey by
identifying soils boundaries within the parcel(s) and naming soils types, including
determination of soils suitability for the intended uses. Wetland areas shall be identified on
the survey. The Site Evaluator shall certify in writing that test pits within the proposed
sewage disposal area(s) meet the requirements for a new system and are located in an area
with enough acceptable soils to meet the Disposal Rules and accommodate the proposed waste
volume, including a suitable safety factor.
11.B.2.b. Variances from the Subsurface Wastewater Disposal Rules promulgated by the
State of Maine Department of Health, including but not limited to, holding tanks and
overboard discharge systems are not allowed.
11.B.3. The design of any private sewage treatment facility must be certified by a Maine
Licensed Professional Engineer to meet all applicable State of Maine standards.
11.B.4. System Design Requirements
11.B.4.a. If the area of the whole parcel being proposed for the enterprise is less than five
(5) acres and the estimated peak week water usage is less than three hundred (300) gallons per
day, or if the area of the parcel being proposed is greater than five (5) acres and the estimated
peal week water usage of the enterprise is less than five hundred (500) gallons per day,
normal state and local requirements apply to the project.
11.B.4.b. For continued peak week average subsurface sewage flow estimates exceeding
the threshold levels in Section 11.B.4.a.
1)
Systems must have a dual alternating processing and distribution capability (e.g.
leach fields), each processing and distribution capability designed to handle the peak
week estimated flow. The system design must be stamped by a Licensed Civil
Engineer and approved by a Licensed Site Evaluator certified by the State of
Maine.
2)
Final installation of the system must be inspected and approved by the Local
Plumbing Inspector and certified by the same Licensed Civil Engineer cited in
Section 11.B.4.b. subsection 1) above, in accord with the approved Final Plan.
11.B.5. Effluent Treatments If the effluent of the enterprise includes process waste from
enterprise operations or includes chemicals or substances different in content or higher in
concentration than that typical of a single family residence, the effluent must be treated or
processed in a system approved by the Maine Department of Health such that the effluent that
enters the subsurface distribution system meets State of Maine Domestic Sewage Disposal
standards and is typical of or better (in chemical content and concentration) than the domestic
waste water associated with a single family residence.
11.B.6. Sewage treatment and disposal systems shall be inspected and certified as fully
functional by the Local Plumbing Inspector on a schedule to be established by the Local
Plumbing Inspector and approved by the Board. This schedule shall be noted on the Final Plan.
The enterprise is responsible for insuring inspections are accomplished on schedule and for
keeping the system fully functional. Failure to comply shall be a violation and subject to
penalties to be determined b the Board of Selectmen and legal action until full functionality is
restored.
11.C. Soil Erosion and Sedimentation
All building, site and roadway design and layouts must harmonize with existing topography and
conserve desirable natural surroundings to the fullest extent possible, such that filling, excavating
and earth moving activity must be kept to a minimum. Parking lots on sloped sites must be terraced
to avoid cut and fill, and/or the need for retaining walls. Natural vegetation must be preserved and
protected whenever possible.
An Erosion and Sedimentation Control Plan shall be prepared in accordance with the Maine Erosion
and Sedimentation Control Handbook for Construction, Best Management Practices, latest revision,
prepared by the Cumberland County Soil and Water Conservation District and the Maine
Department of Environmental Protection, which is incorporated herein by reference and made a
part thereof. This plan shall be prepared either by a Professional Civil Engineer or by a Certified
Professional in Erosion and Sedimentation Control (CPESC). At a minimum the following items shall
be discussed and provided:
11.C.1. A vicinity map showing the location of water bodies that may be affected by
erosion and sedimentation from the project;
11.C.2. Existing and proposed drainage patterns, including drainage channels that drain to
surrounding water bodies;
11.C.3. A sequence of work that outlines how the project will be constructed and
specifically addresses how soil disturbance will be minimized during the construction
process;
11.C.4. Clear definition of the limits of work and buffer areas that will remain undisturbed
and a statement of how these areas will be protected during construction;
11.C.5. Description of temporary and permanent erosion control practices to be used;
11.C.6. Identification of the locations of the temporary and permanent erosion control
practices;
11.C.7. Identification of how and where, collected sediment will be disposed;
11.C.8. Dust control measures;
11.C.9. Inspection and maintenance procedures including scheduling and frequency. The Board
may request the review and endorsement of this plan by the Knox-Lincoln Soil and Water
Conservation District. The applicant shall agree as a part of the application that the procedures
outlined in the Soil Erosion and Sedimentation Control Plan shall be implemented during the site
preparation, construction and clean up stages. The name, address, and telephone number of the
person responsible for implementation of the Plan shall be provided to the Code Enforcement
Officer and the Local Plumbing Inspector prior to the commencement of any construction.
11.D. Streets and Roads
11.D.1. For enterprises that generate less than an average of thirty (30) vehicle trips per day and
whose ways of access and egress are not shared by another parcel in different ownership, normal
road and driveway zoning standards apply.
For enterprises that generate an average of thirty (30) or greater vehicle trips per day or whose ways
of access and egress are shared by another parcel in different ownership, the Town of Westport
Island Subdivision Ordinance, Road and Street Standards shall apply with one modification:
Minimum Road Width
Less than 30 vehicle trips per day 14 feet 31 to
100 vehicle trips per day 16 feet More than
100 vehicle trips per day 18 feet
Trip generation estimates shall be consistent with methods recommended in the latest edition of
"Trip Generation", published by the Institute of Transportation Engineers.
11.D.2. Adequacy of the Road System
11.D.2.a. Vehicular access to the site must be on roads, which have adequate capacity
to accommodate the additional traffic generated by the enterprise.
11.D.2.b. The applicant must provide a detailed estimate of the average vehicular traffic,
both peak hour and average daily by week (average usage calculations for each week
throughout the year), consistent with "Maine Department of Transportation standards and
Usage Tables". For projects which will generate greater than two hundred and fifty (250)
vehicular trips per day average during peak week, the project must be located to have
dedicated, on site, privately maintained access to the Main Road (Rt. 144). This requirement
may be waived by the Planning Board if it determines that the project will not have an
unnecessary adverse impact on traffic flow or safety.
11.D.3. Access into the Site
11.D.3.a. Vehicular access to and from the development must be safe and
convenient.
11.D.3.b. Where a lot has frontage on two (2) or more roads, the primary access to and
egress from the lot must be provided from the road, which has less potential for traffic
congestion and for traffic and pedestrian hazards.
11.D.3.c. The following criteria must be used to limit the number of driveways
serving a proposed project:
No use shall have more than two (2) points of entry and two (2) points of egress. The
combined width of all access ways must not exceed sixty (60) feet.
11.D.4. Internal Vehicle Circulation
11.D.4.a. The layout of the site must provide for the safe movement of passenger service,
and emergency vehicles through the site.
Enterprises that will be served by delivery vehicles must provide a clear route for such
vehicles with appropriate geometric design to allow turning and backing for a minimum of
two (2) vehicles typical of those to be employed.
11.D.4.b. Clear routes of access must be provided and maintained for emergency
apparatus and personnel and must be posted with appropriate signage (e.g. FIRE LANE -
NO PARKING).
11.D.4.c. The layout and design of parking areas must provide for safe and
convenient circulation of vehicles throughout the lot.
11.D.4.d. All roadways must be designed to harmonize with the topographic and natural
features of the site insofar as practical by minimizing filling, grading, excavation, or other
similar activities which result in unstable soil conditions and soil
erosion, by fitting the development to the natural contour of the land and avoiding substantial
areas of excessive grade and tree removal, and by retaining existing vegetation during
construction. The road network must provide for vehicular¸ pedestrian, and cyclist safety, all
season emergency access, snow removal and storage, and delivery and collection services.
11.D.5. Parking Layout and Design
Employee, customer and supplier parking shall be provided for on-site. On-site parking must
conform to the following standards:
11.D.5.a. Parking areas with more than two (2) parking spaces must be arranged so that it is
not necessary for vehicles to back into the road.
11.D.5.b. All parking spaces, access drives, and impervious surfaces must be located at least
forty (40) feet from any side or rear lot line, except where standards for buffer yards
require a greater distance. No parking spaces shall be located within seventy-five (75) feet of
the front property line. Parking lots on adjoining lots may be connected by access ways not
exceeding twenty-four (24) feet in width.
11.D.5.c. Parking stalls and aisle layout must conform to the following standards:
Parking
Angle
Stall
Width
Skew
Width
Stall
Depth
Aisle
Width
90 degree
way
60 degree
9'-0"
8'-6"
10'-6"
18'-0"
18'-0"
24'-0"
16'-0"
two
one
way only
45 degree
8'-6"
12'-9"
17'-6"
12'-0" one
way only
30 degree
8'-6"
17'-0"
17'-0"
12'-0" one
only
11.D.5.d. In lots utilizing diagonal parking, the direction of proper traffic flow must be
indicated by signs, pavement markings or other permanent indications and maintained as
necessary.
11.D.5.e. Parking areas must be designed to permit each motor vehicle to proceed to and
from the parking space provided for it without requiring the moving of any other moter
vehicles.
11.D.5.f. Provisions must be made to restrict the "overhang" of parked vehicles when it
might restrict traffic flow on adjacent through roads, restrict pedestrian or bicycle
movement on adjacent walkways, or damage landscape materials.
11.D.6. Pedestrian Access
The site plan must provide for a system of pedestrian ways within the development appropriate to
the type and scale of development. This system must connect the major building entrances and
exits with parking areas and with existing sidewalks, if they exist or are planned in the vicinity of
the project. The pedestrioan network may be located either in the road right-of-way or outside
the right-of-way in open space or recreation areas
11.E. Site Clearing and Common Land
11.E.1. The enterprise shall limit the clear cutting of trees to a minimum level consistent with
the necessary functions of the enterprise and a note to that effect shall stipulate those clear cut
areas on the Final Plan.
11.E.2. Reservation or Dedication and Maintenance of Common Land, Facilities and
Services
11.E.2.a. All common land, facilities and property shall be controlled by an association
which has as its principal purpose the conservation or preservation of land in essentially
its natural condition.
11.E.2.b. Further subdivision of the common land and its use for other than non-
commercial recreation, or conservation purposes, except for easements for utilities, shall be
prohibited. Structures and buildings accessory to non-commercial recreational or
conservation uses may be erected on the common land.
11.E.2.c. The common land shall be shown on the Final Plan with appropriate notations
on the Final Plan to indicate that it shall not be used for future building lots.
11.E.2.d. Common land shall not be designated as open space, permanently
protected open space, public access open space or forever wild open space.
11.F. Storm Water Management
A Storm Water Management Plan prepared by a Registered Professional Engineer, shall be
designed so that the post development storm water runoff does not exceed the pre development
storm water runoff for the 24 hour duration of 2 year, 10 year, and 25 year frequency storm
events. The storm water plan shall be prepared in accordance
with "Storm Water Management for Maine: Best Management Practices", latest edition,
prepared by the Maine Department of Environmental Protection, which is incorporated herein
by reference and made a part thereof. The storm water plan shall include the following
information for the pre and post development conditions: drainage area boundaries, hydrologic
soils groups, ground cover type, time of concentration flow paths, modeling methodology,
calculations, and background data. The Board may
require review and endorsement of the storm water plan and calculations by the Knox Lincoln Soil
and Water Conservation District.
11.G. Emergency Municipal Services
11.G.1. Roads, Streets and Driveways
11.G.1.a. Any road, street or driveway, public or private, within the enterprise shall
provide turnaround capability for emergency vehicles within one hundred (100) feet of all
primary structures serviced by said road, street or driveway.
11.G.1.b. Any road, street or driveway, public or private, within the enterprise shall be
constructed such that emergency vehicles shall have unimpeded access and egress between all
primary structures within the enterprise and the nearest turn around position.
11.G.2. Emergency Provisions
11.G.2.a. Any proposal for a new enterprise shall include a site fire protection plan. The
plan shall provide adequate ingress and egress for emergency vehicles and identify a source(s)
of water supply for firefighting as outlined by the National Fire Protection Association
Standards (NFPA 1142, Standards on Water Supplies for Suburban and Rural Fire Fighting),
and/or other provisions for any additional elements mutually agreed to with the Town's Fire
Chief, as needed to ensure adequate fire protection. A review of the Plan by the Town's Fire
Chief shall be done prior to the public hearing.
11.G.2.b. Full coverage sprinkler systems shall be installed in all new principal
structures consistent with NFPA 13 2002 as revised or amended.
11.H. Financial and Technical Capacity
11.H.1. Financial Capacity
The applicant may show financial capacity through a demonstration that the property to be
developed is owned in fee simple, with no outstanding economic encumbrances and has an
assessed value large enough to cover the cost of proposed public and quasi-public improvement or
the cost, reasonably, to restore the project site to its original condition whichever is greater or,
11.H.2. Make an offer of a budget for the construction of all necessary facilities, accompanied
by a clear statement by a contractor who has worked recently in the local area that the proposed
developments can be constructed for the budgeted amount. This offer must be accompanied by an
irrevocable letter of credit, or a bond furnished by an insurance carrier authorized to do business in
Maine, sufficient to cover the budgeted amount.
11.I. Monuments
Permanent monuments shall be set at all corners and angle points of the enterprise lots and boundaries;
and at all intersections and points of curvature. All monuments shall be constructed and embedded in
the ground in accordance with commonly accepted good surveying practices.
11.J. Road Names and 911 Addresses
Roads, which join or are in alignment with roads of abutting or neighboring properties, shall bear the
same name. Names of new roads shall not duplicate, nor bear phonetic resemblance to the names of
existing roads within the municipality, nor in neighboring communities, and shall be subject to the
approval of the Board of Selectmen. Prior to Final Plan Approval, the applicant shall contact the 911
Officer or Deputy to provide 911 addresses for all lots in the enterprise.
11.K. Surface Drainage
11.K.1. All improvements recommended in the drainage plan submitted pursuant to
Section 11.F. shall be shown on the approved plan.
11.K.2. Topsoil shall be considered part of the enterprise. Except for "surplus" topsoil
for roads, parking areas and building excavation, it is not to be removed from the site.
11.K.3. Except for normal thinning and landscaping, existing vegetation shall be left intact to
prevent soil erosion. The Board shall require the applicant to take measures to correct and prevent
soil erosion in the proposed enterprise as detailed in the Sedimentation and Erosion Plan submitted
pursuant to Section 11.C.
11.K.4. To prevent soil erosion of shoreline areas, tree cutting on the shoreline shall conform
to the Shoreland Zoning Ordinance of the Town of Westport Island, as amended.
11.L. Utilization of the Site
The plan for the development must reflect the natural capabilities of the site to support
development. Buildings, lots, and support facilities must be clustered in those portions of the site
that have the most suitable conditions for development. Environmentally sensitive areas, including but
not limited to, wetlands, steep slopes, floodplains, significant wildlife habitats, fisheries, scenic areas,
habitat for rare and endangered plants and animals, unique natural communities and natural areas, and
sand and gravel aquifers must be maintained and preserved to the maximum extent. Natural drainage
areas must also be preserved to the maximum extent. The development must include appropriate
measures for protecting these resources, including but not limited to, modification of the proposed
design of the site, timing of construction, and limiting the extent of excavation.
11.M. Utilities
The development must be provided with electrical, telephone and telecommunication service
adequate to meet the anticipated use of the project. New utility lines and facilities must be screened
from view to the extent feasible.
11.N. Natural Features
11.N.1. The landscaping must be preserved in its natural state insofar as practical by minimizing
tree removal, disturbance and compaction of soil, and by retaining existing vegetation insofar as
practical during construction. Extensive grading and filling must be avoided as far as possible.
11.N.2. All structures, signage, driveways and parking areas must be located on the lot to
maximize the aesthetic appearance of the site and to retain to the maximum possible extent the
rural character of the site.
11.N.3. Landscaping must enhance the natural appearance of the site.
11.N.4. All proposed site development located on Route 144 requires a natural buffer of fifty
(50) feet along Route 144. All proposed site development not located on Route 144 requires a
natural buffer of thirty (30) feet on its frontage road. All proposed site development must
retain twenty (20) foot natural buffers along all other boundaries. The Board may, for
enterprises whose buildings and parking areas exceed 10,000 square feet, require applicant to
landscape a buffer if an adequate pre-existing natural buffer is not present.
11.O. Harmful, Hazardous, Special and Radioactive Materials
11.O.1. The handling, storage, transportation, use and disposal of all materials
identified by the standards of a federal or state agency as hazardous, special or
radioactive must be in compliance with the standards of these agencies.
11.O.2. No flammable or explosive liquids, solids or gases shall be stored in bulk above ground
unless they are located at least seventy-five (75) feet from any lot line. All materials must be
stored in a manner and location, which is in compliance with appropriate rules and applicable
regulations of the NFPA, Maine Department of Public Safety and other appropriate federal, state
and local regulations.
11.O.3. Any storage facility for fuel, chemicals, wastes or any potentially harmful materials shall
be located on impervious pavement and shall be completely enclosed by an impervious dike high
enough to contain the total volume of material kept in the storage facility, plus the
accumulated rainfall of a fifty (50) year storm (if outdoor storage). Any alternative storage
containment method shall provide superior protection to the environment and shall be approved by
a Licensed Professional Engineer.
11.P. Solid Waste Management
The proposed development must provide for adequate disposal of non hazardous solid wastes. All solid
waste must be disposed of at a licensed disposal facility having adequate capacity to accept he project's
wastes.
11.Q. Dust, Gases, Odors, and Radiation
The creation of emissions of dust, dirt, fly ash, fumes, vapors, gases or radiation which could be
injurious to human health¸ animals or vegetation; detrimental to the enjoyment of adjoining or
nearby properties; or which could soil or stain persons or property or disrupt normal activities at any
point beyond the lot line of the enterprise creating the emission, shall be prohibited. In addition, no
enterprise shall be permitted to produce harmful, offensive or bothersome odors, scents or aromas
which are clearly incompatible with the surrounding environment and perceptible beyond their lot lines,
either at ground or habitable elevation. The location and vertical height of all exhaust fans, vents,
chimneys or any other sources discharging or emitting smoke, fumes, gases, vapors, odors, scents or
aromas shall be shown on the Plan with a complete description of the source materials. Analysis of
sources, locations and levels of electromagnetic radiation emitted from the enterprise shall also be
shown on the Plan.
11.R Lighting
11.R.1. Lighting shall be controlled in both height and intensity to maintain a rural
character. To achieve this, luminaries shall be shielded to prevent light shining beyond the lot
lines onto neighborhood properties or public ways.
11.R.2. Light standards are restricted to a height of twenty (20) feet.
11.R.3. All lighting (except minimal required for security purposes) shall be turned off
between the hours of 9:00 PM and 6:00 AM. Any exception must be approved by the Board and
based on the enterprise's operational requirements.
11.S. Noise
Noise from sources related to enterprise operations shall be controlled to maintain the rural
character of the Town.
Sound pressure emanating from enterprise sources measured four (4) feet above the ground surface at
the lot lines shall not exceed the following levels:
7:00 AM to 9:00 PM
50dBA*
9:00 PM to 7:00 AM
40dBA**
*This level may be exceeded by 10dBA for a single period of 30 minutes in any one (1) day.
** 40dBA is equivalent to quiet conversation.
11.T. Facades
11.T.1. It is particularly important that new construction, as viewed from the public ways,
meets minimum design criteria to blend harmoniously with the rural character of a coastal New
England town as envisioned in the Westport Island Comprehensive Plan.
11.T.2. Exterior colors shall be consistent with a rural vista. Colors such as white or those
known as "colonial colors" shall be utilized.
11.T.3. The design of the building shall be compatible with New England buildings such as
barns and sail lofts. Exterior siding shall resemble clapboard, shingle or other siding commonly
seen in rural New England.
11.U. Construction Standards
Electrical service to the enterprise and the electrical wiring within the enterprise shall be safe and
adequate for the intended use and certified by a Licensed Electrician to be consistent with all
applicable industry and state standards.
11.V. Signs
11.V.1. The following provisions shall govern the use of signs:
11.V.1.a. Signs and billboards relating to enterprise name and/or goods and services sold on
the premises shall be permitted, provided that such signs shall not exceed twenty (20) square
feet in area and shall not exceed eight (8) feet in any direction. No more that two (2) signs
per premises shall be allowed.
11.V.1.b. Billboards and signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
11.V.1.c. No sign shall extend into a public way (including any shoulder).
11.V.1.d. No sign shall be higher than twenty (20) feet above the ground.
11.V.1.e. No sign may be mounted to trees, utility poles, or other natural objects that
protrude above the ground.
11.V.1.f. No sign shall be mounted on or above any roofs.
11.V.1.g. Signs may be reflectively illuminated only by shielded, non-flashing, clear
incandescent lights during the hours specified in Section 11.R.
11.V.1.h. No signs may have any moving parts.
11.V.2. Signs not in conformance with the provisions of this standard and which existed at the
time of the adoption of this Ordinance shall be allowed to remain and be maintained. No non-
conforming sign shall be reconstructed, remodeled, relocated, or
changed in size or content (including trade name, different words, letters or numbers, new
design, different colors or different logo) unless such change(s) will make the sign conforming
in all respects to the above standards.
11.W. Minimum Lot Standards
11.W.1. For new enterprises requiring site plan review:
District
Minimum Lot
Area (acres)
Minimum Frontage
(feet)
Minimum Shore
Frontage (feet) (If
applicable)
Limited Development
3
250
250
Limited Residential/Commercial
3
250
250
Comm. Fisheries/Maritime Activ.
2
150
150
Commercial enterprises are prohibited in the Resource Protection Districts.
11.W.2. Land below the normal high water line of a water body or upland edge of a
wetland shall not be included toward calculating minimum lot area.
11.W.3. Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land on both
sides thereof after September 2, 1971.
11.W.4. The minimum width of any portion of any lot within one hundred (100) feet,
horizontal distance, of the normal high water line of a water body or upland edge of a wetland
shall be equal to or greater than the shore frontage requirement for a lot with the proposed
use.
11.W.5. If more than one principal enterprise is constructed on a single parcel, each
additional principal enterprise shall require an additional one hundred and fifty (150) feet of
frontage, lot width and shore frontage, if applicable. All other dimensional requirements,
including minimum lot size shall be met for each additional principal structure.
11.X. Principal and Accessory Structures
11.X.1. All new principal and accessory structures shall be set back one hundred (100) feet from
any body of water, tributary stream, or the upland edge of a wetland, except that in the
Commercial Fisheries/Maritime Activities Districts there shall be no minimum setback for water
dependent structures and uses.
11.X.2. Principal or accessory structures and expansions of existing structures which are
permitted in the Limited Development Districts and the Limited Residential/Commercial Districts
shall not exceed thirty-five (35) feet in height. This provision shall not apply to
structures such as transmission towers, windmills, and similar structures having no floor area. The
above cited structures are not permitted in Resource Districts.
11.X.3. Minimum Lot Width
No principal or accessory structure shall be erected on a lot having a width of less than two
hundred fifty (250) feet in the Limited Development District and the Limited
Residential/Commercial District and one hundred fifty (150) feet in the Commercial
Fisheries/Maritime District, measured through that part of the building where the lot is
narrowest.
11.X.4. Set Back
11.X.4.a. No building or structure or any portion thereof shall be erected within seventy-
five (75) feet from the right-of-way or sideline of any road or street. If there is no established
right-of-way sideline for any road or street, said sideline shall be deemed to be sixteen and
one half (16 1/2) feet from the center of the road or street.
11.X.4.b. Driveways and access ways from public or private roads shall not be
erected within forty (40) feet of side property lines.
11.X.5. Side Yards and Rear Yards
11.X.5.a. For every enterprise building erected in any district, there shall be a minimum
side lot clearance on each side of said building of not less than seventy- five (75) feet,
which space shall remain open and unoccupied by any structure.
11.X.5.b. No enterprise building or structure or any portion thereof except steps and
uncovered porches extending less than ten (10) feet from such building shall be erected
within seventy-five (75) feet of any back line.
11.X.6. Corner Lots
The setback building line on a corner shall be in accordance with the provision governing the
road or street on which the building faces. If possible, the side lot clearance on the side road
shall conform to the setback line for an inside lot on said street or road, but in no event shall
side yard clearance be less than seventy-five (75) feet from the right-or-way sideline.
SECTION 12. - INSPECTION AND ENFORCEMENT
12.A. Consistent with the approved time-phased project (Section 6.B.2.r.), upon completion of
each approved phase of construction prior to the approved occupancy of the premises, and/or
commencement of enterprise operation, the applicant shall submit to the Board, a signed and
stamped statement by a Registered Professional Engineer stating that the project phase has been
constructed in accordance with the approved plan. Also the applicant shall request approval of the
Board to occupy the premises, and to commence
enterprise operations, consistent with the approved time-phased project plan (Section 6.B.2.r.). The
Board shall approve, approve with conditions or deny requests for occupancy or commencement of
operations within thirty (30) days of the request and issue findings of fact.
12.B. It shall be the duty of the Board of Selectmen or their appointed agent, including but not
limited to, the Code Enforcement Officer and/or the Local Plumbing Inspector, to enforce this
Ordinance. The Board of Selectmen or their appointed agent may conduct on- site inspections to
ensure compliance with all applicable laws and conditions attached to the approved application.
12.C. If the Board of Selectmen or their appointed agent finds upon inspection of the improvements
that any of the required improvements have not been constructed in accordance with the Final
Plans, recordable documents and specifications filed by the applicant at the Town Office, the
inspecting official shall so report in writing to the Board of Selectmen, the Board, the applicant and
the builder. This report in writing shall constitute notice of violation. The Board of Selectmen shall
take legal steps necessary through the consent order process to assure compliance with the approved
Final Plans. Failure by the applicant to act in accordance with the Final Plans as approved, shall be a
violation and subject to penalties to be determined by the Board of Selectmen.
12.D. The applicant may request, following completion of all construction related to any phase
of the approved time-phased project plan, that the Board review the project and certify that the
conditions relating to that construction have been met.
12.E. If the Local Plumbing Inspector or other authorized agent finds upon ongoing period
inspections as specified in the Standards Section 11. that required systems are not performing as
specified in the Final Plan, or concentrations exceed limits of the standard, the inspecting official
shall so report in writing to the Board of Selectmen, the Planning Board, the current owner and
enterprise management. This report in writing shall constitute notice of violation. The Board of
Selectmen shall take legal steps necessary to assure timely compliance with the approved Final Plans.
Failure by the applicant to act in accordance with the Final Plans as approved, shall be a violation
and subject to penalties to be determined by the Board of Selectmen.
If ongoing periodic inspections show increased water or septic usage beyond the thresholds allowed
by the ordinance, the inspection official shall report such increased levels in writing to the Board of
Selectmen, the Board, the current owner and enterprise management. This report in writing shall
constitute notice of Expansion of Use and require a Site Plan Review application to be filed with the
Board within three (3) months of such notice. Failure to reapply for Site Plan Review within three
(3) months based on this expansion of use shall constitute a violation and the Planning Board shall
provide notice of such violation in writing to the owner and occupants and to the Board of Selectmen.
The Board of Selectmen shall take any legal steps necessary to assure continued compliance with this
Ordinance. Failure
by applicant to act in accordance with the Final Plans as approved, shall be a violation and subject to
penalties to be determined by the Board of Selectmen.
12.F. Violations
12.F.1. Occupancy of the premises or commencing enterprise operations without approval
of the Board is not allowed.
12.F.2. No public utility or any utility company of any kind shall provide new service to any
enterprise for which a Final Plan has not been approved by the Board.
12.F.3. Development of an enterprise specified in Section 3.B. without Board approval shall be
a violation of law.
12.F.4. Any person, firm, or corporation being the owner of or having control or use of any
building or premises, and who violated any of the provisions of this Ordinance, shall be penalized
in accordance with Title 30-A M.R.S.A. Section 4452, subsection 3.
12.F.5. Violations of the above provisions of this section are a nuisance and shall be punished in
accordance with the provisions of Title 30-A M.R.S.A. Section 4452, subsection 3. Each day such
a violation is permitted to exist after notification shall constitute a separate offence. The Board of
Selectmen, or their authorized agent(s), are hereby also authorized to enter into administrative
consent agreements for the purpose of eliminating violations of this Ordinance and recovering
penalties without court action.
SECTION 13. - APPEALS
If a person, firm, corporation or other legal entity is aggrieved by any aspect of this Ordinance, an appeal
may be made to the Board of Appeals.
13.A. Any appeal to the Board of Appeals shall be filed on a Board of Appeals application form, and
shall include all required submissions as well as the Board of Appeals fee. See the Fee Schedule,
application form and instructions at the Town Office.
13.B. All appeals shall be filed within thirty (30) days of the action or decision, which is being
appealed. The application shall specify all points and reasons for appeal.
13.C. The Board of Appeals shall hold an appellate hearing if the decision or action being appealed is
from the Planning Board or a de novo hearing if the decision being appealed is from the Code
Enforcement Officer within thirty-five (35) days of the receipt of the completed application, and
may affirm, modify or reverse the decision or action. The Board of Appeals shall inform the applicant
of the decision in writing within seven (7) days of its decision.
13.D. Any aggrieved party may appeal the Board of Appeals decision to the Superior Court within
forty-five (45) days of the date of such decision pursuant to Rule 80B of the Maine Rules of Civil
Procedure.
SECTION 14. - REVOCATION OF A PERMIT
14.A. A permit may be revoked only because of administrative error or fraud during the
original application process.
14.B. Procedures for Revocation of a Permit
Any party, the Board of Selectmen or their appointed agent(s) may present information regarding
administrative error or fraud to the Board.
14.B.1. Fraud
14.B.1.a. If the Board determines that a significant fraudulent testimony may have been
submitted, it shall hold a noticed public hearing. Notice shall be sent to the applicant and all
others to whom notice was required to be sent for the original approval. If, following the
hearing the Board determines that there is credible information that the facts submitted in
support of the application may be fraudulent, no matter the cause, the Board may forward
the request to the Board of Appeals that the permit be revoked.
14.B.1.b. The Board of Appeals shall hold a noticed public hearing following the
receipt of a request for revocation from the Board, providing that the Board's
request was received within two (2) years of the Board's final decision to approve the
enterprise.
14.B.1.c. The Board's Chairman or a properly approved representative shall attend the
Board of Appeals hearing and present appropriate evidence as to information submitted to it,
its deliberations and subsequent decision. The burden of proof that fraud occurred shall
however, rest with the party claiming fraud.
14.B.1.d. The Board of Appeals may revoke a permit for a fraud upon finding that:
i. The facts presented by the applicant during the approval process were
significantly and purposely in error, and
ii. Such facts were material to the decision to approve the application, and
iii. The availability of the true facts at the time of the application may have caused
a denial of the application.
14.B.2. Administrative Errors
Appeal on the basis of administrative error shall be made only by admitted and statutory
parties. It shall be made to the Board of Appeals, and may only be entertained
if the provisions and time frames that apply to an appeal of the decisions of the Board are
maintained.
SECTION 15. - SEVERABILITY
A finding of invalidity or unconstitutionality of any provisions of this Ordinance shall not invalidate any
other part.
SECTION 16. - DEFINITIONS
Any word or term defined in the Town of Westport Island Shoreland Zoning Ordinance, the
Building Code Ordinance or the Subdivision Ordinance shall have the definition contained in
those Ordinances, unless defined differently herein. Other words and terms used in this
Ordinance, and not found in the above cited Ordinances, shall have their customary dictionary
meanings as found in the latest Webster Collegiate Dictionary. Other words and terms used are
defined as follows:
Abutter - Owners of record of immediately adjacent property; owners of record of property
located immediately across a public road or right-of-way.
Accessory Building - A detached, subordinate building, the use of which is clearly incidental and
related to that of the principal building or use of the land, and which is located on the same lot
as that of the principal building or use.
Accessory Structure or Use - A detached, subordinate structure, the use of which is clearly
incidental and related to that of the principal structure or use of the land, and which is located
on the same lot as that of the principal structure or use. A deck or similar extension of the
principal structure or a garage attached to the principal structure by a roof or a common wall is
considered part of the principal structure.
Aggrieved Party - An owner of land whose property is directly or indirectly affected by the
granting of or denial of a permit or variance under this Ordinance, a person whose land abuts
land, and for which a permit or variance has been granted, or any other person or group of
persons, who have suffered particularized injury as a result of the granting of such permit or
variance.
Agriculture - The production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to, forages and sod crops, grains and seed crops, dairy animals and
dairy products, poultry and poultry products, livestock, fruits and vegetables, and ornamental
and green house products. Agriculture does not include Forest Management and Timber
Harvesting activities.
Appellate Hearing - A Board of Appeals Hearing at which only the material which was the basis
for the decision or action by the Planning Board is reviewed to determine if the action or
decision can be upheld.
Applicant: - The person submitting any application under the provisions of a specific Ordinance
including a firm, association, organization, partnership, trust, estate, governmental agency,
municipality, company, corporation, two or more individuals having a joint or common
interest, or other legal entity, as well as an individual.
Authorized Agent - An individual or a firm having written authorization to act on behalf of a
property owner. The authorization shall be made by the property owner.
Average Daily Traffic (ADT) - The predicted number of vehicles that enter and exit the premises
during the day, based on the trip generation rates in the latest edition of "Trip Generation"
published by the Institute of Transportation Engineers.
Board of Appeals-The Board of Appeals of the Town of Westport Island to which an aggrieved
party may apply for a review of a decision or action by the Code Enforcement Officer or the
Planning Board. The Board of Appeals also hears variance appeals.
Buffer Area - A part of a property or an entire property, which is not built upon and is
specifically intended to separate and thus minimize the effects of a land use activity (e.g. noise,
dust, visibility, glare, etc.) on adjacent properties or on sensitive natural resources.
Building - Any permanent structure, having one or more floors and a roof, which is used for the
housing or enclosure of persons, animals, or property. When any portion thereof is separated
by a division wall without opening, then each such portion shall be deemed a separate
building. Sidewalks, fences, driveways, parking lots. retaining walls, electrical transmission
poles and lines, signs and flagpoles are not considered to be buildings.
Central Water Supply System - A system using a single source of water and supplying 3 or more
dwelling units and/or enterprises.
Coastal Wetlands - All tidal and sub-tidal lands, all lands with vegetation present that is tolerant
of salt water and occurs primarily in a salt water or estuarine habitat, and any swamp, marsh,
bog, beach, flat or other contiguous low land that is subject to tidal action during the highest
spring tide level for the year in which an activity is proposed, as identified in tide tables
published by the National Ocean Service. Coastal wetlands may include portions of coastal
sand dunes.
NOTE: All areas below the maximum spring tide level are coastal wetlands. These areas may
consist of rocky ledges, sand dunes and cobble beaches, mud flats, etc. in addition to salt
marshes and salt meadows.
Code Enforcement Officer or CEO - A person certified under Maine law and employed by a
municipality to enforce all applicable comprehensive planning and land use laws and
ordinances.
Commercial Use(s) - The use of lands, buildings, or structures, other than a "home occupation"
as defined, the intent and result of which activity is the production of income from the
buying and selling of goods and/or services, exclusive of rental of residential buildings and/or
dwelling units.
Complete Application - An application shall be considered complete upon submission of the
appropriate fee and all information required by Town Ordinances, or by a vote by the
appropriate board to waive the submission of certain required information. The Planning
Board shall inform the applicant of its determination that an application is complete.
Comprehensive Plan - A document or interrelated documents adopted by the Legislative Body
of the Town of Westport Island, containing an inventory and analysis of existing conditions, a
compilation of goals for the development of the community, an expression of policies for
achieving these goals, and a strategy for implementation of the policies.
Conforming - A building, structure or land use, or portion thereof, which complies with
applicable Westport Island Ordinances.
Curb Cut - The opening along the curb line or street right-of-way line at which point vehicles
may enter or leave the street. A curb cut on a state road requires a permit from the State.
dBA, Decibel - A standard measure of relative sound pressure levels. Quiet Residential
measures approximately 40 dBA.
de novo Hearing - A Board of Appeals hearing at which new information can be admitted, in
addition to the record and materials of the decision or action by the Code Enforcement
Officer.
Developed Area - Any area on which a site improvement or change is made, including buildings,
landscaping, parking areas and roads.
Driveway - A vehicular access way serving two lots or two single family dwellings or one two
family dwelling or less,
Enterprise - A systematic or purposeful activity or set of activities that are nonresidential in
nature.
Expansion of a Structure - An increase in the floor area and/or volume of a structure greater
than 20% over a 10-year period, including all extensions such as, but not limited to, attached
decks, garages, porches, and green houses.
Expansion of Use: The addition of one or more months to a use's operating season over a 10-
year period; or the use of more floor or ground area devoted to a particular use; or greater
than a 20% increase in water consumption to a usage level greater than 500 gallons per day or
the use of greater than 20% floor area or ground area devoted to a particular use over a ten (10)
year period.
Expert An individual who has experience, knowledge, and credentials in a particular field. The
determination to accept any "expert" rests solely with the reviewing body.
Final Plan - The complete set of plans describing the proposed enterprise, and which are to be
submitted to the Planning Board for its review and decision.
Final Plat Filing - The final drawings representing the approved enterprise, including any
modification or conditions agreed to as part of the Planning Board's approval of the Final Plat
and all other recordable documents required for filing at the Registry of Deeds.
Forest Management Activities: - Timber cruising and other forest resource evaluation activities,
pesticide or fertilizer applications, management planning activities, timber stand improvement,
pruning, regeneration of forest stands, and other similar or associated activities, exclusive of
timber harvesting and the construction, creation, or maintenance of roads for this purpose.
Foundation - The supporting substructure of a building or other structure, excluding wooden
sills and post supports, but including basements, slabs, frost walls, or other base consisting of
concrete, block, brick or similar material.
Freshwater Wetland - Freshwater swamps, marshes, bogs, and similar areas other than forest
wetlands, which are:
1) Of ten (10) or more contiguous acres, or if less than ten (10) contiguous
acres and adjacent to a surface water body excluding any river, stream, or
brook, such that, in a natural state the combined surface area is in excess of ten
(10) acres, and
2) Is inundated or saturated by surface or ground water at a frequency and for a
duration sufficient to support, and which under normal circumstances do support.
a prevalence of wetland vegetation typically adapted for life in saturated soils,
and not considered a part of a coastal wetland, river, brook, or stream.
Freshwater wetlands may contain small stream channels or inclusions of land
that do not conform to this definition.
Frontage - That portion of a lot fronting upon and providing rights of access to a public or
private road listed on the Schedule of Town Roads on file with the Town Clerk, or to an
approved or accepted new right-of-way laid out in accordance with the Town Ordinances, to be
measured continuously along a single street or road line. Owners of lots fronting on two roads
may select that which may be considered "frontage". On a corner lot, frontage shall be
measured to the point of intersection of the extension of the sidelines of the roads. The
minimum frontage for permitted uses within the Town of Westport Island must be met by
contiguous frontage within the Town of Westport Island on an approved or accepted right-of
way in the Town of Westport Island. Alternatively, frontage may be considered to be shore
frontage.
Height of a Structure: - The vertical distance between the mean original grade (prior to
construction} at the downhill side of the structure and the highest point of the structure,
excluding chimneys, steeples. antennas, and similar appurtenances having no floor area.
Home Occupation - An occupation or profession which is customarily conducted in a residential
structure or property, and which is: 1) clearly incidental to and compatible with the residential
use of the property and surrounding residential uses, and 2) which employs no more than two
(2) persons other than family members residing in the home.
Industrial -The assembling, fabrication. finishing, manufacturing, packaging, or processing of
goods.
Landowner - The owner of record of the fee simple title to a parcel, tract or lot of land
Light Standards - Poles or similar structures on which light sources are mounted.
Lot Area - The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath roads
serving more than two (2) lots.
Luminaries - Devices which provide sources of artificial light.
Mineral Extraction - Any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat or other
like material from its natural location, and transports the product removed, away from the
extraction site.
Minimum Lot Width: - The closest distance between the side lines of a lot. When only two lot
lines extend into the Shoreland Zone, both lot lines shall be considered to be the side lines.
Multi-Family Development - A subdivision which contains three or more dwelling units on
land in common ownership, such as apartment buildings or condominiums.
Municipal Engineer - Any registered professional engineer hired or retained by the
municipality, either as staff or on a consulting basis, with the authority to act for the
municipality.
Natural Buffer - Area of undisturbed trees, shrubs or other vegetation.
Non-conforming Enterprise - An enterprise which does not meet one or more of the criteria or
standards of this Ordinance, but which is allowed to exist solely because it was in lawful
existence at the time this Ordinance or subsequent amendments took effect.
Non-Conforming Lot - A single lot of record, which, at the effective date of this Ordinance,
does not meet the area, frontage, or width requirements of the district in which it is located,
and existed prior to affective date of this Ordinance.
Non-conforming Structure - A structure which does not meet any one or more of the
dimensional requirements: setback, height, or lot coverage, but which is allowed solely
because it was associated with a non-conforming Enterprise, which pre-existed at the time
this Ordinance or subsequent amendments took effect.
Non-conforming Use - Use of buildings, structures, premises, land, or parts thereof, which is
associated with a Non-conforming Enterprise and pre-existed at the time this Ordinance or
subsequent amendments took effect.
Normal High-Water Line (non-tidal water) - That line which is apparent from visible
markings, changes in the character of soils due to prolonged action of the water or changes in
vegetation, and which distinguishes between predominantly aquatic and predominantly
terrestrial land. Areas contiguous with rivers and great ponds that support non-forested
wetland vegetation and hydric soils and that are at the same or lower elevation as the water level
of the river or great pond during the period of normal high water are considered part of the
river or great pond.
NOTE: In the case of tidal waters, setbacks are measured from the upland edge of the "coastal
wetland".
100 Year Flood - The highest level or flood that, on the average, has a 1% chance of occurring in
any given year.
Party - Owners of record of immediately adjacent property; owners of record of property
located immediately across a public road or right-of-way; other property owners who having
shown that their property may be affected by the proposed development under a specific
criterion or standard, shall be admitted to testify with participation limited to that criterion or
standard.
Person - An individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or
other legal entity.
Planning Board - The Planning Board for the Town of Westport Island.
Principal Structure: A building other than one which is used for purposes wholly incidental
or accessory to the use of another building or use on the same premises.
Principal Use(s): A use or uses other than one which is wholly incidental or accessory to
another use on the same premises.
Professional Engineer: A professional engineer registered in the State of Maine.
Public Water System: A water supply system that provides water to at least fifteen (15) service
connections or supplies water to at least twenty-five (25) individuals daily for at least thirty (30)
days a year.
Replacement System - A system intended to replace: 1) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or 2) any existing overboard wastewater discharge, or the replacement of an
existing holding tank
Road - A route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized vehicles,
excluding a driveway as defined.
Setback - The nearest horizontal distance from a lot line or normal high-water line to the
nearest part of a structure, road, parking space or other regulated object or area.
Shore Frontage - The length of a lot bordering on a water body or wetland measured in a
straight line between the intersections of the lot lines with the shoreline at normal high-
water level.
Shoreland Zone - The land area located within two hundred and fifty (250) feet, horizontal
distance, of the normal high water line of any great pond, river, salt water body, or within
250 feet, horizontal distance, of the upland edge of a coastal wetland, including all areas
affected by tidal action; within two hundred and fifty (250) feet of the upland edge of a
fresh water wetland; or within seventy-five (75) feet, horizontal distance, of the normal
high water line of a stream.
Sight Distance - The length of an unobstructed view from a particular access point to the
farthest visible point of reference on a roadway. Used in this Ordinance as a reference for
unobstructed road visibility. Sight distance is measured from the perspective of a
hypothetical person seated in a vehicle.
Signage - Graphics, letters or numerals used to identify or draw attention to the enterprise.
Sketch Plan - Conceptual maps, renderings, and supportive data describing the project
proposed by the applicant prior to submitting an application for review of the project.
Solid Waste - Useless, unwanted, or discarded solid material with insufficient liquid content
to be free flowing, including but not limited to rubbish, garbage, scrap materials, junk,
refuse, and inert fill material and landscape refuse, but does not include hazardous waste,
biomedical waste, septic tank sludge or agricultural wastes. The fact that a solid waste, or
constituent of the waste may have a value, be beneficially used, have other use, or be sold or
exchanged, does not exclude it from this definition.
Structure - Anything built for the support, shelter or enclosure of persons, animals, goods or
property of any kind, together with anything constructed or erected with a fixed location on
or in the ground, exclusive of fences, poles, wiring and other aerial equipment normally
associated with service drops as well as guying and guy anchors. The term includes structures
temporarily or permanently located, such as decks, patios and satellite dishes.
Subdivision - The division of a tract or parcel of land as defined in Title 30-A M.S.R.A. Section
4401 et. Seq. as amended.
Substantial Start - Completion of thirty (30) percent of a permitted structure or use measured
as a percent of estimated total cost.
Subsurface Sewage Disposal - Any system designed to dispose of waste or wastewater on or beneath
the surface of the earth, including, but not limited to septic tanks, disposal fields, grandfathered
cesspools, holding tanks, pretreatment filters, piping or any other fixture, mechanism or
apparatus used for those purposes. This does not include any licensed discharge system, any
surface water waste disposal system, or any municipal or quasi municipal sewer or wastewater
treatment system.
Tract of Parcel of Land - All contiguous land in the same ownership, provided that lands
located on opposite sides of a public or private road shall be considered each a separate tract
or parcel of land unless such road was established by the owner of land on both sides thereof.