1
SHORELAND ZONING ORDINANCE
FOR
THE MUNICIPALITY OF WOODSTOCK
Effective December 31, 1991
Amended March 29, 1993
Amended March 2004
Amended March 2011
Amended March 27, 2017
TABLE OF CONTENTS
2
Page
1. Purposes ................................................................................................................................................. 4
2. Authority ................................................................................................................................................ 4
3. Applicability ........................................................................................................................................... 4
4. Effective Date of Ordinance and Ordinance Amendments .................................................................... 4
5. Availability ............................................................................................................................................. 4
6. Severability ............................................................................................................................................. 5
7. Conflicts with Other Ordinances ............................................................................................................ 5
8. Amendments ........................................................................................................................................... 5
9. Districts and Zoning Map ....................................................................................................................... 5
A. Official Shoreland Zoning Map ....................................................................................................... 5
B. Scale of Map .................................................................................................................................... 5
C. Certification of Official Shoreland Zoning Map ............................................................................. 5
D. Changes to the Official Shoreland Zoning Map .............................................................................. 5
10. Interpretation of District Boundaries ..................................................................................................... 5
11. Land Use Requirements ......................................................................................................................... 5
12. Non-conformance ................................................................................................................................... 6
A. Purpose ............................................................................................................................................ 6
B. General ............................................................................................................................................. 6
C. Non-conforming Structures ............................................................................................................. 6
D. Non-conforming Uses ...................................................................................................................... 9
E. Non-conforming Lots..................................................................................................................... 10
13. Establishment of Districts .................................................................................................................... 11
A. Resource Protection District .......................................................................................................... 11
B. Limited Residential District ........................................................................................................... 11
C. Limited Commercial District ......................................................................................................... 11
D. Stream Protection District ............................................................................................................ 12
14. Table of Land Uses .............................................................................................................................. 12
15. Land Use Standards ............................................................................................................................. 14
A. Minimum Lot Standards ................................................................................................................ 14
B. Principal and Accessory Structures ............................................................................................... 14
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Beyond the Normal High-Water Line of a Water body or Within a Wetland ............................... 17
D. Campgrounds ................................................................................................................................. 18
E. Individual Private Campsites ........................................................................................................ 18
F. Commercial and Industrial Uses .................................................................................................... 19
G. Parking Areas ................................................................................................................................. 20
H. Roads and Driveways ................................................................................................................... 20
I.
Signs............................................................................................................................................... 22
J. Storm Water Runoff ..................................................................................................................... 23
K. Septic Waste Disposal .................................................................................... .. 23
L. Essential Services ......................................................................................................................... 23
M. Mineral Exploration and Extraction ............................................................................................. 24
N. Agriculture ..................................................................................................................................... 24
O. Timber Harvesting - State-Wide Standards .................................................................................. 25
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ...................... 33
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal .................................................. 35
R. Exemptions to Clearing and Vegetation Removal Requirements ................................................. 36
3
S. Revegation Requirements .............................................................................................................. 37
T. Erosion and Sedimentation Control .............................................................................................. 39
U. Soils ..................................................................................................... ........ 40
V. Water Quality. ............................................................................................................................... 40
W. Archaelofical Site .......................................................................................................................... 40
16. Administration ...................................................................................................................................... 40
A. Administering Bodies and Agents ................................................................................................ 40
B. Permits Required ........................................................................................................................... 41
C. Permit Application ......................................................................................................................... 41
D. Procedure for Administering Permits ........................................................................................... 42
E. Special Exceptions ......................................................................................................................... 43
F. Expiration of Permit ...................................................................................................................... 43
G. Installation of Public Utility Service ............................................................................................ 43
H. Appeals .......................................................................................................................................... 44
J. Enforcement ................................................................................................................................... 47
17. Definitions ........................................................................................................................................... 48
18. Effective Dates ..................................................................................................................................... 58
4
Shoreland Zoning Ordinance for the Municipality of
Woodstock, Maine
_____________________________
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and healthful
conditions; to prevent and control water pollution; to protect fish spawning grounds, aquatic life, bird
and other wildlife habitat; to protect buildings and lands from flooding and accelerated erosion; to
protect archaeological and historic resources; to protect commercial fishing and maritime industries;
to protect freshwater and coastal wetlands; to control building sites, placement of structures and land
uses; to conserve shore cover, and visual as well as actual points of access to inland and coastal
waters; to conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38 sections
435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
-
normal high-water line of any great pond or river, or
-
upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier, or
other structure extending or located below the normal high-water line of a water body or within a
wetland.
4. Effective Date of Ordinance and Ordinance Amendments.
This Ordinance, which was adopted by the municipal legislative body on December 31, 1991 and
amended on June 2016, shall not be effective unless approved by the Commissioner of the
Department of Environmental Protection. A certified copy of the Ordinance, or Ordinance
Amendment, attested and signed by the Municipal Clerk, shall be forwarded to the
Commissioner for approval. If the Commissioner fails to act on this Ordinance or Ordinance
Amendment, within forty-five (45) days of his/her receipt of the Ordinance, or Ordinance
Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the Ordinance, or
Ordinance Amendment, is approved by the Commissioner.
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and shall be
accessible to any member of the public. Copies shall be made available to the public at reasonable
cost at the expense of the person making the request. Notice of availability of this Ordinance shall be
posted.
5
6. Severability. Should any section or provision of this Ordinance be declared by the courts to be
invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or statute
administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body. Copies of
amendments, attested and signed by the Municipal Clerk, shall be submitted to the Commissioner of
the Department of Environmental Protection following adoption by the municipal legislative body
and shall not be effective unless approved by the Commissioner. If the Commissioner fails to act on
any amendment within forty-five (45) days of his/her receipt of the amendment, the amendment is
automatically approved. Any application for a permit submitted to the municipality within the forty-
five (45) day period shall be governed by the terms of the amendment, if such amendment is
approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are hereby
divided into the following districts as shown on the Official Shoreland Zoning Map(s) which is
made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) Stream Protection
B. Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less than: 1
inch = 2000 feet. District boundaries shall be clearly delineated and a legend indicating the
symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall be
certified by the attested signature of the Municipal Clerk and shall be located in the municipal
office. In the event the municipality does not have a municipal office, the Municipal Clerk shall
be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with Section 8,
are made in the district boundaries or other matter portrayed on the Official Shoreland Zoning
Map, such changes shall be made on the Official Shoreland Zoning Map within thirty (30) days
after the amendment has been approved by the Commissioner of the Department of
Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland Zoning
Map, district boundary lines are property lines, the centerlines of streets, roads and rights of way, and
the boundaries of the shoreland area as defined herein. Where uncertainty exists as to the exact
location of district boundary lines, the Board of Appeals shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land shall
hereafter be used or occupied, and no building or structure or part thereof shall hereafter be erected,
6
constructed, expanded, moved, or altered and no new lot shall be created except in conformity with
all of the regulations herein specified for the district in which it is located, unless a variance is
granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that non-
conforming conditions that existed before the effective date of this Ordinance or amendments
thereto shall be allowed to continue, subject to the requirements set forth in Section 12. Except
as otherwise provided in this Ordinance, a non-conforming condition shall not be permitted to
become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be transferred, and
the new owner may continue the non-conforming use or continue to use the non-conforming
structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal upkeep and
maintenance of non-conforming uses and structures including repairs or renovations that do
not involve expansion of the non-conforming use or structure, and such other changes in a
non-conforming use or structure as federal, state, or local building and safety codes may
require.
NOTE: See Section 17 for the definitions of non-conforming structures, non-conforming uses and non-
conforming lots.
C. Non-conforming Structures
(1) Expansions. All new principal and accessory structures, excluding functionally water-
dependent uses, must meet the water body, tributary stream, or wetland setback requirements
contained in Section 15(B)(1). A non-conforming structure may be added to or expanded
after obtaining a permit from the same permitting authority as that for a new structure, if
such addition or expansion does not increase the non-conformity of the structure and is in
accordance with subparagraphs (a) and (b) below.
(a) Expansion of any portion of a structure within 25 feet of the normal high-water line of a
water body, tributary stream, or upland edge of a wetland is prohibited, even if the
expansion will not increase nonconformity with the water body, tributary stream or
wetland setback requirement. Expansion of an accessory structure that is located closer
to the normal high-water line of a water body, tributary stream, or upland edge of a
wetland than the principal structure is prohibited, even if the expansion will not increase
nonconformity with the water body, tributary stream, or wetland setback requirement.
(b) Notwithstanding paragraph (a), above, if a legally existing nonconforming principal
structure is entirely located less than 25 feet from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland, that structure may be expanded as
follows, as long as all other applicable municipal land use standards are met and the
expansion is not prohibited by Section 12(C)(1).
7
(i) The maximum total footprint for the principal structure may not be expanded
to a size greater than 800 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of the principal
structure may not be made greater than 15 feet or the height of the existing structure,
whichever is greater.
(c) All other legally existing nonconforming principal and accessory structures that do
not meet the water body, tributary stream, or wetland setback requirements may be
expanded or altered as follows, as long as other applicable municipal land use standards
are met and the expansion is not prohibited by Section 12C(1) or Section 12(C)(1)(a),
above.
(i) For structures located less than 75 feet from the normal high-water line of a water
body, tributary stream, or upland edge of a wetland, the maximum combined total
footprint for all structures may not be expanded to a size greater than 1,000 square
feet or 30% larger than the footprint that existed on January 1, 1989, whichever is
greater. The maximum height of any structure may not be made greater than 20 feet
or the height of the existing structure, whichever is greater.
(ii) For structures located less than 100 feet from the normal high-water line of a great
pond classified as GPA or a river flowing to a great pond classified as GPA, the
maximum combined total footprint for all structures may not be expanded to a size
greater than 1,500 square feet or 30% larger than the footprint that existed on
January 1, 1989, whichever is greater. The maximum height of any structure may not
be made greater than 25 feet or the height of the existing structure, whichever is
greater. Any portion of those structures located less than 75 feet from the normal
high-water line of a water body, tributary stream, or upland edge of a wetland must
meet the footprint and height limits in Section 12(C)(1)(b)(i) and Section
12(C)(1)(c)(i), above.
(iii) In addition to the limitations in subparagraphs (i) and (ii), for structures that are
legally nonconforming due to their location within the Resource Protection District
when located at less than 250 feet from the normal high-water line of a water body or
the upland edge of a wetland, the maximum combined total footprint for all
structures may not be expanded to a size greater than 1,500 square feet or 30% larger
than the footprint that existed at the time the Resource Protection District was
established on the lot, whichever is greater. The maximum height of any structure
may not be made greater than 25 feet or the height of the existing structure,
whichever is greater, except that any portion of those structures located less than 75
feet from the normal high-water line of a water body, tributary stream, or upland
edge of a wetland must meet the footprint and height limits in Section 12(C)(1)(b)(i)
and Section 12(C)(1)(c)(i), above.
(d) An approved plan for expansion of a nonconforming structure must be recorded by
the applicant with the registry of deeds, within 90 days of approval. The recorded
plan must show the existing and proposed footprint of the non-conforming structure,
the existing and proposed structure height, the footprint of any other structures on
the parcel, the shoreland zone boundary and evidence of approval by the municipal
review authority.
8
(2) Foundations. Whenever a new, enlarged, or replacement foundation is constructed
under a nonconforming structure, the structure and new foundation must be placed such that
the setback requirement is met to the greatest practical extent as determined by the Planning
Board or its designee, basing its decision on the criteria specified in Section 12(C)(3)
Relocation, below.
(3) Relocation. A non-conforming structure may be relocated within the boundaries of the parcel
on which the structure is located provided that the site of relocation conforms to all setback
requirements to the greatest practical extent as determined by the Planning Board or its
designee, and provided that the applicant demonstrates that the present subsurface sewage
disposal system meets the requirements of State law and the State of Maine Subsurface
Wastewater Disposal Rules (Rules), or that a new system can be installed in compliance with
the law and said Rules. In no case shall a structure be relocated in a manner that causes the
structure to be more non-conforming.
In determining whether the building relocation meets the setback to the greatest practical
extent, the Planning Board or its designee shall consider the size of the lot, the slope of the
land, the potential for soil erosion, the location of other structures on the property and on
adjacent properties, the location of the septic system and other on-site soils suitable for septic
systems, and the type and amount of vegetation to be removed to accomplish the relocation.
When it is necessary to remove vegetation within the water or wetland setback area in order
to relocate a structure, the Planning Board shall require replanting of native vegetation to
compensate for the destroyed vegetation in accordance with Section 15(S). In addition, the
area from which the relocated structure was removed must be replanted with vegetation.
Replanting shall be required as follows:
(a) Trees removed in order to relocate a structure must be replanted with at least one native
tree, three (3) feet in height, for every tree removed. If more than five trees are planted,
no one species of tree shall make up more than 50% of the number of trees planted.
Replaced trees must be planted no further from the water or wetland than the trees that
were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at least the
same size as the area where vegetation and/or ground cover was disturbed, damaged, or
removed must be reestablished within the setback area. The vegetation and/or ground
cover must consist of similar native vegetation and/or ground cover that was disturbed,
destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of the
structure shall be replanted with vegetation which may consist of grasses, shrubs, trees,
or a combination thereof.
(4) Reconstruction or Replacement. Any non-conforming structure which is located less than the
required setback from a water body, tributary stream, or wetland and which is removed, or
damaged or destroyed, regardless of the cause, by more than 50% of the market value of the
structure before such damage, destruction or removal, may be reconstructed or replaced
9
provided that a permit is obtained within eighteen (18) months of the date of said damage,
destruction, or removal, and provided that such reconstruction or replacement is in
compliance with the water body, tributary stream or wetland setback requirement to the
greatest practical extent as determined by the Planning Board or its designee in accordance
with the purposes of this Ordinance. In no case shall a structure be reconstructed or replaced
so as to increase its non-conformity. If the reconstructed or replacement structure is less than
the required setback it shall not be any larger than the original structure, except as allowed
pursuant to Section 12(C)(1) above, as determined by the non-conforming footprint of the
reconstructed or replaced structure at its new location. If the total footprint of the original
structure can be relocated or reconstructed beyond the required setback area, no portion of
the relocated or reconstructed structure shall be replaced or constructed at less than the
setback requirement for a new structure. When it is necessary to remove vegetation in order
to replace or reconstruct a structure, vegetation shall be replanted in accordance with Section
12(C)(3) above.
Any non-conforming structure which is located less than the required setback from a water
body, tributary stream, or wetland and which is removed by 50% or less of the market value,
or damaged or destroyed by 50% or less of the market value of the structure, excluding
normal maintenance and repair, may be reconstructed in place if a permit is obtained from
the Planning Board within one year of such damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the setback to the
greatest practical extent the Planning Board or its designee shall consider, in addition to the
criteria in Section 12(C)(3) above, the physical condition and type of foundation present, if
any.
(5) Change of Use of a Non-conforming Structure. The use of a non-conforming structure may
not be changed to another use unless the Planning Board, after receiving a written
application, determines that the new use will have no greater adverse impact on the water
body, tributary stream, or wetland, or on the subject or adjacent properties and resources than
the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall require
written documentation from the applicant, regarding the probable effects on public health
and safety, erosion and sedimentation, water quality, fish and wildlife habitat, vegetative
cover, visual and actual points of public access to waters, natural beauty, floodplain
management, archaeological and historic resources, and other functionally water-dependent
uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-conforming
residential uses may, after obtaining a permit from the Planning Board, be expanded within
existing residential structures or within expansions of such structures as allowed in Section
12(C)(1) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming use is
discontinued for a period exceeding one year, or which is superseded by a conforming use,
may not again be devoted to a non-conforming use except that the Planning Board may, for
10
good cause shown by the applicant, grant up to a one year extension to that time period. This
provision shall not apply to the resumption of a use of a residential structure provided that
the structure has been used or maintained for residential purposes during the preceding five
(5) year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-conforming
use provided that the proposed use has no greater adverse impact on the subject and adjacent
properties and resources than the former use, as determined by the Planning Board. The
determination of no greater adverse impact shall be made according to criteria listed in
Section 12(C)(5) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot in the
same ownership, and that all provisions of this Ordinance except lot area, lot width and shore
frontage can be met. Variances relating to setback or other requirements not involving lot
area, lot width or shore frontage shall be obtained by action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or joint
ownership of record at the time of adoption of this Ordinance, if all or part of the lots do not
meet the dimensional requirements of this Ordinance, and if a principal use or structure
exists on each lot, the non-conforming lots may be conveyed separately or together, provided
that the State Minimum Lot Size Law (12 M.R.S.A. sections 4807-A through 4807-D) and
the State of Maine Subsurface Wastewater Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the effective
date of this ordinance, each may be sold on a separate lot provided that the above referenced
law and rules are complied with. When such lots are divided each lot thus created must be as
conforming as possible to the dimensional requirements of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels are in
single or joint ownership of record at the time of or since adoption or amendment of this
Ordinance, if any of these lots do not individually meet the dimensional requirements of this
Ordinance or subsequent amendments, and if one or more of the lots are vacant or contain no
principal structure the lots shall be combined to the extent necessary to meet the dimensional
requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is non-
conforming, owned by the same person or persons on the effective date of December 31,
1991 of this Ordinance and recorded in the registry of deeds if the lot is served by a public
sewer or can accommodate a subsurface sewage disposal system in conformance with the
State of Maine Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square feet of lot
area; or
11
(b) Any lots that do not meet the frontage and lot size requirements of Section 12(E)(3)(a)
are reconfigured or combined so that each new lot contains at least 100 feet of shore
frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological ecosystems, or
scenic and natural values. This district shall include the following areas when they occur within
the limits of the shoreland zone, exclusive of the Stream Protection District, except that areas
which are currently developed and areas which meet the criteria for the Limited Commercial or
General Development I Districts need not be included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater wetlands and
wetlands associated with great ponds and rivers, which are rated "moderate" or "high" value
waterfowl and wading bird habitat, including nesting and feeding areas, by the Maine
Department of Inland Fisheries and Wildlife (MDIF&W) that are depicted on a Geographic
Information System (GIS) data layer maintained by either MDIF&W or the Department as of
December 31, 2008. For the purposes of this paragraph "wetlands associated with great
ponds and rivers" shall mean areas characterized by non-forested wetland vegetation and
hydric soils that are contiguous with a great pond or river, and have a surface elevation at or
below the water level of the great pond or river during the period of normal high water.
"Wetlands associated with great ponds or rivers" are considered to be part of that great pond
or river.
(2) Floodplains along rivers and floodplains along artificially formed great ponds along rivers,
defined by the 100 year floodplain as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the flood
of record, or in the absence of these, by soil types identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric soils,
which are not part of a freshwater wetland as defined, and which are not surficially
connected to a water body during the period of normal high water.
NOTE: These areas usually consist of forested wetlands abutting water bodies and non-forested
wetlands.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or river bed movement.
B. Limited Residential District. The Limited Residential District includes those areas suitable for
residential and recreational development. It includes areas other than those in the Resource
Protection District, or Stream Protection District, and areas which are used less intensively than
those in the Limited Commercial District or the General Development Districts.
C. Limited Commercial District. The Limited Commercial District includes areas of mixed, light
commercial and residential uses, exclusive of the Stream Protection District, which should not be
12
developed as intensively as the General Development Districts. This district includes areas of
two or more contiguous acres in size devoted to a mix of residential and low intensity business
and commercial uses. Industrial uses are prohibited.
D. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream, exclusive of
those areas within two-hundred and fifty (250) feet, horizontal distance, of the normal high-water
line of a great pond, or river, or within two hundred and fifty (250) feet, horizontal distance, of
the upland edge of a freshwater wetland. Where a stream and its associated shoreland area are
located within two-hundred and fifty (250) feet, horizontal distance, of the above water bodies or
wetlands, that land area shall be regulated under the terms of the shoreland district associated
with that water body or wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the Shoreland
Zone, shall conform with all of the applicable land use standards in Section 15. The district
designation for a particular site shall be determined from the Official Shoreland Zoning Map.
Key to Table 1:
Yes -
Allowed (no permit required but the use must comply with all applicable land use
standards.)
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI -
Allowed with permit issued by the Local Plumbing Inspector
Abbreviations:
RP -
Resource Protection
GD-
General Development I and General Development II
LR -
Limited Residential
LC-
Limited Commercial
SP -
Stream Protection
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
LR
LC
13
1.
Non-intensive recreational uses not requiring structures such as hunting, fishing
and hiking
yes
yes
yes
yes
2.
Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
3.
Forest management activities except for timber harvesting & land management
roads
yes
yes
yes
yes
4.
Timber harvesting
yes
CEO
yes
yes
5.
Clearing or removal of vegetation for activities other than timber harvesting
CEO
CEO1
yes
yes
6.
Fire prevention activities
yes
yes
yes
yes
7.
Wildlife management practices
yes
yes
yes
yes
8.
Soil and water conservation practices
yes
yes
yes
yes
9.
Mineral exploration
no
yes2
yes2
yes2
10.
Mineral extraction including sand and gravel extraction
no
PB3
PB
PB
11.
Surveying and resource analysis
yes
yes
yes
yes
12.
Emergency operations
yes
yes
yes
yes
13.
Agriculture
yes
PB
yes
yes
14.
Aquaculture
PB
PB
PB
yes
15.
Principal structures and uses
A.
One and two family residential, including driveways
PB4
PB9
PB
PB
B.
Multi-unit residential
no
no
PB
PB
C.
Commercial
no
no10
no10
PB
D.
Industrial
no
no
no
no
E.
Governmental and institutional
no
no
PB
PB
F.
Small non-residential facilities for educational, scientific, or nature
interpretation purposes
PB4
PB
PB
PB
16.
Structures accessory to allowed uses
PB4
PB
PB
PB
17.
Piers, docks, wharfs, bridges and other structures and uses extending over
or below the normal high-water line or within a wetland
a.
Temporary
b.
Permanent
PB
PB
PB
PB
PB
PB
PB
PB
18.
Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
LPI
19.
Home occupations
PB
PB
PB
CEO
20.
Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
21.
Essential services
PB6
PB6
PB
PB
A.
Roadside distribution lines (34.5kV and lower)
PB
PB
yes12
yes12
B.
Non-roadside or cross-country distribution lines involving ten poles or less
in the shoreland zone
PB6
PB6
PB
PB
C.
Non-roadside or cross-country distribution lines involving eleven or more
poles in the shoreland zone
PB6
PB6
PB
PB
D.
Other essential services
PB6
PB6
PB
PB
22.
Service drops, as defined, to allowed uses
yes
yes
yes
yes
23.
Public and private recreational areas involving minimal structural development
PB
PB
PB
PB
24.
Individual, private campsites
PB
PB
PB
PB
25.
Campgrounds
no
no7
PB
PB
26.
Road construction
PB
no8
PB
PB
27.
Land management roads
yes
PB
yes
yes
28.
Parking facilities
no
no7
PB
PB
29.
Marinas
PB
no
PB
PB
30.
Filling and earth moving of <10 cubic yards
CEO
CEO
yes
yes
31.
Filling and earth moving of >10 cubic yards
PB
PB
CEO
CEO
32.
Signs
yes
yes
yes
yes
33.
Uses similar to allowed uses
PB
PB
PB
PB
34.
Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
35.
Uses similar to uses requiring a PB permit
PB
PB
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
5Functionally water-dependent uses and uses accessory to such water dependent uses only (See note on previous page).
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
8Except as provided in Section 15(H)(4).
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16(E), Special
Exceptions. Two-family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to
38 M.R.S.A. section 480-C, if the activity occurs in, on, over or adjacent to any freshwater wetland, great pond, river, stream or brook and
operates in such a manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
14
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to a sand dune; or
D.
Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall conform with the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit
43,560
200
(1 acre)
(b) Governmental, Institutional, Commercial
60,000
300
or Industrial per principal structure
(c) Public and Private Recreational Facilities
43,560
200
(1 acre)
(2) Land below the normal high-water line of a water body or upland edge of a wetland and land
beneath roads serving more than two (2) lots shall not be included toward calculating
minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a separate
tract or parcel of land unless such road was established by the owner of land on both sides
thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland shall be
equal to or greater than the shore frontage requirement for a lot with the proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional, commercial or
industrial structure or use, or combination thereof, is constructed or established on a single
parcel, all dimensional requirements shall be met for each additional dwelling unit, principal
structure, or use.
(6) Clustered housing is encouraged within the shoreland zone provided that the overall
dimensional requirements, including frontage and lot area per dwelling unit, are met.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred (100) feet,
horizontal distance, from the normal high-water line of great ponds classified GPA and rivers
that flow to great ponds classified GPA, and seventy-five (75) feet, horizontal distance, from
the normal high-water line of other water bodies, tributary streams, or the upland edge of a
wetland, except that in the General Development I District the setback from the normal high-
water line shall be at least twenty five (25) feet, horizontal distance. In the Resource Protection
15
District the setback requirement shall be 250 feet, horizontal distance, except for structures,
roads, parking spaces or other regulated objects specifically allowed in that district in which
case the setback requirements specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply to
structures which require direct access to the water body or wetland as an operational
necessity, such as piers, docks and retaining walls, nor to other functionally water-
dependent uses.
(b) The Planning Board may increase the required setback of a proposed structure, as a
condition to permit approval, if necessary to accomplish the purposes of this ordinance.
Instances where a greater setback may be appropriate include, but not be limited to, areas
of steep slope; shallow or erodible soils; or where an adequate vegetative buffer does not
exist.
(c) On a non-conforming lot of record on which only a residential structure exists, and it is not
possible to place an accessory structure meeting the required water body, tributary stream
or wetland setbacks, the Planning Board may issue a permit to place a single accessory
structure, with no utilities, for the storage of yard tools and similar equipment. Such
accessory structure shall not exceed eighty (80) square feet in area nor eight (8) feet in
height, and shall be located as far from the shoreline or tributary stream as practical and
shall meet all other applicable standards, including lot coverage and vegetation clearing
limitations. In no case shall the structure be located closer to the shoreline or tributary
stream than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are permitted in
the Resource Protection, Limited Residential, Limited Commercial, and Stream Protection
Districts, shall not exceed thirty-five (35) feet in height. This provision shall not apply to
structures such as transmission towers, windmills, antennas, and similar structures having no
floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including basements,
shall be elevated at least one foot above the elevation of the 100 year flood, the flood of
record, or in the absence of these, the flood as defined by soil types identified as recent
flood-plain soils. In those municipalities that participate in the National Flood Insurance
Program and have adopted the April 2009 version, or later version, of the Floodplain
Management Ordinance, accessory structures may be placed in accordance with the
standards of that ordinance and need not meet the elevation requirements of this paragraph.
(4) With the exception of General Development Districts located adjacent to rivers that do not
flow to great ponds, non-vegetated surfaces shall not exceed a total of twenty (20) percent
of the portion of the lot located within the shoreland zone. This limitation does not apply to
public boat launching facilities regardless of the district in which the facility is located.
In a General Development district located adjacent to rivers that do not flow to great ponds,
non-vegetated surfaces shall not exceed a total of seventy (70) percent of the portion of the
lot located within the shoreland zone.
16
For the purposes of calculating lot coverage, non-vegetated surfaces include, but are not
limited to the following: structures, driveways, parking areas, and other areas from which
vegetation has been removed. Naturally occurring ledge and rock outcroppings are not
counted as nonvegetated surfaces when calculating lot coverage for lots of record on March
25, 1990 and in continuous existence since that date.
(5) Retaining walls that are not necessary for erosion control shall meet the structure setback
requirement, except for low retaining walls and associated fill provided all of the following
conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-water line
of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is a site
eroding from lack of naturally occurring vegetation, and which cannot be stabilized with
vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams,
wetlands, and tributary streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps, or the
flood of record, or in the absence of these, by soil types identified as recent flood plain
soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a combination
thereof, and no further structural development will occur within the setback area,
including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the normal
high-water line of a water body, tributary stream, or upland edge of a wetland when a
natural buffer area does not exist. The buffer area must meet the following
characteristics:
(i)
The buffer must include shrubs and other woody and herbaceous vegetation. Where
natural ground cover is lacking the area must be supplemented with leaf or bark
mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and provide
for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse the
buffer;
17
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal distance, of a
water body, tributary stream or coastal wetland, a permit pursuant to the Natural
Resource Protection Act is required from the Department of Environmental Protection.
(6) Notwithstanding the requirements stated above, stairways or similar structures may be allowed
with a permit from the Planning Board, to provide shoreline access in areas of steep slopes or
unstable soils provided: that the structure is limited to a maximum of four (4) feet in width;
that the structure does not extend below or over the normal high-water line of a water body or
upland edge of a wetland, (unless permitted by the Department of Environmental Protection
pursuant to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C); and that the
applicant demonstrates that no reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below the
Normal High-Water Line of a Water Body or Within a Wetland, and Shoreland Stabilization.
(1) No more than one pier, dock, wharf or similar structure extending or located below the normal
high-water line of a water body or within a wetland is allowed on a single lot; except that when
a single lot contains at least twice the minimum shore frontage as specified in Section 15(A), a
second structure may be allowed and may remain as long as the lot is not further divided.
(2) Access from shore shall be developed on soils appropriate for such use and constructed so as to
control erosion.
(3) The location shall not interfere with existing developed or natural beach areas.
(4) The facility shall be located so as to minimize adverse effects on fisheries.
(5) The facility shall be no larger in dimension than necessary to carry on the activity and be
consistent with the surrounding character and uses of the area. A temporary pier, dock or wharf
in non-tidal waters shall not be wider than six feet for non-commercial uses.
(6) No new structure shall be built on, over or abutting a pier, wharf, dock or other structure
extending beyond the normal high-water line of a water body or within a wetland unless the
structure requires direct access to the water body or wetland as an operational necessity.
(7) New permanent piers and docks on non-tidal waters shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and a
permit has been obtained from the Department of Environmental Protection, pursuant to the
Natural Resources Protection Act.
(8) No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water line of a water body or within a wetland shall be
converted to residential dwelling units in any district.
(9) Structures built on, over or abutting a pier, wharf, dock or other structure extending beyond
the normal high-water line of a water body or within a wetland shall not exceed twenty (20)
feet in height above the pier, wharf, dock or other structure.
18
(10) Vegetation may be removed in excess of the standards in Section 15(P) of this Ordinance in
order to conduct shoreline stabilization of an eroding shoreline, provided that a permit is
obtained from the Planning Board. Construction equipment must access the shoreline by
barge when feasible as determined by the Planning Board.
(a) When necessary, the removal of trees and other vegetation to allow for construction
equipment access to the stabilization site via land must be limited to no more than 12 feet
in width. When the stabilization project is complete the construction equipment
accessway must be restored.
(b) Revegetation must occur in accordance with Section 15(S).
[Note: The following provision will apply to only a few municipalities.]
(11) A deck over a river may be exempt from the shoreland setback requirements if it is part of a
downtown revitalization project that is defined in a project plan approved be the legislative body
of the municipality, and may include the revitalization of sructures formerly used as mills that do
not meet the structure setback requirements, if the deck meets the following requirements:
(a) The total deck area attached to the structure does not exceed 700 square feet;
(b) The deck is cantilevered over a segment of a river that is located within the
boundaries of the downtown revitalization project;
(c) The deck is attached to or accessory to an allowed commercial use in a structure
that was constructed prior to 1971 and is located within the downtown revitalization
project;
(d) The construction of the deck complies with all other applicable standards, except
the shoreline setback requirements in Section 15(B); and
(e) The construction of the deck complies with all other state and federal laws.
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed under State
licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land, not
including roads and driveways, for each site. Land supporting wetland vegetation, and land
below the normal high-water line of a water body shall not be included in calculating land
area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility and
service buildings shall be set back a minimum of one hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river flowing to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal high-
water line of other water bodies, tributary streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with campgrounds
are allowed provided the following conditions are met:
19
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty thousand
(30,000) square feet of lot area within the shoreland zone, whichever is less, may be
permitted.
(2) When an individual private campsite is proposed on a lot that contains another principal use
and/or structure, the lot must contain the minimum lot dimensional requirement for the
principal structure and/or use, and the individual private campsite separately.
(3) Campsite placement on any lot, including the area intended for a recreational vehicle or tent
platform, shall be set back one hundred (100) feet, horizontal distance, from the normal high-
water line of a great pond classified GPA or river flowing to a great pond classified GPA,
and seventy-five (75) feet, horizontal distance, from the normal high-water line of other
water bodies, tributary streams, or the upland edge of a wetland.
(4) Only one recreational vehicle shall be allowed on a campsite. The recreational vehicle shall
not be located on any type of permanent foundation except for a gravel pad, and no structure
except a canopy shall be attached to the recreational vehicle.
(5) The clearing of vegetation for the siting of the recreational vehicle, tent or similar shelter in a
Resource Protection District shall be limited to one thousand (1000) square feet.
(6) A written sewage disposal plan describing the proposed method and location of sewage
disposal shall be required for each campsite and shall be approved by the Local Plumbing
Inspector. Where disposal is off-site, written authorization from the receiving facility or land
owner is required.
(7) When a recreational vehicle, tent or similar shelter is placed on-site for more than one
hundred and twenty (120) days per year, all requirements for residential structures shall be
met, including the installation of a subsurface sewage disposal system in compliance with the
State of Maine Subsurface Wastewater Disposal Rules unless served by public sewage
facilities.
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds classified GPA, and rivers and
streams which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than amounts
normally associated with individual households or farms.
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
20
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10)
Petroleum or petroleum product storage and/or sale except storage on same property as
use occurs and except for storage and sales associated with marinas
(11)
Photographic processing
(12)
Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements for
structures for the district in which such areas are located. The setback requirement for
parking areas serving public boat launching facilities in Districts other than the General
Development I District shall be no less than fifty (50) feet, horizontal distance, from the
shoreline or tributary stream if the Planning Board finds that no other reasonable alternative
exists further from the shoreline or tributary stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed to prevent
stormwater runoff from flowing directly into a water body, tributary stream or wetland and
where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet long.
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads and/or
driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal distance,
from the normal high-water line of a great pond classified GPA or a river that flows to a
great pond classified GPA, and seventy-five (75) feet, horizontal distance from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a wetland
unless no reasonable alternative exists as determined by the Planning Board. If no other
reasonable alternative exists, the road and/or driveway setback requirement shall be no less
than fifty (50) feet, horizontal distance, upon clear showing by the applicant that appropriate
techniques will be used to prevent sedimentation of the water body, tributary stream, or
wetland. Such techniques may include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief culverts and turnouts placed so as to
avoid sedimentation of the water body, tributary stream, or wetland.
21
On slopes of greater than twenty (20) percent the road and/or driveway setback shall be
increased by ten (10) feet, horizontal distance, for each five (5) percent increase in slope
above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or driveways
that provide access to permitted structures and facilities located nearer to the shoreline or
tributary stream due to an operational necessity, excluding temporary docks for recreational
uses. Roads and driveways providing access to permitted structures within the setback area
shall comply fully with the requirements of Section 15(H)(1) except for that portion of the
road or driveway necessary for direct access to the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of their
setback from a water body, tributary stream or wetland.
(3) New roads and driveways are prohibited in a Resource Protection District except that the
Planning Board may grant a permit to construct a road or driveway to provide access to
permitted uses within the district. A road or driveway may also be approved by the Planning
Board in a Resource Protection District, upon a finding that no reasonable alternative route
or location is available outside the district. When a road or driveway is permitted in a
Resource Protection District the road and/or driveway shall be set back as far as practicable
from the normal high-water line of a water body, tributary stream, or upland edge of a
wetland.
(4) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one (1)
vertical, and shall be graded and stabilized in accordance with the provisions for erosion and
sedimentation control contained in Section 15(T).
(5) Road and driveway grades shall be no greater than ten (10) percent except for segments of
less than one hundred (100) feet of run. Segments with a grade of greater than ten (10)
percent shall be followed by a segment of less than ten (10) pervent for a distance of at least
two hundred (200) feet.
(6) In order to prevent road and driveway surface drainage from directly entering water bodies,
tributary streams or wetlands, roads and driveways shall be designed, constructed, and
maintained to empty onto an unscarified buffer strip at least (50) feet plus two times the
average slope, in width between the outflow point of the ditch or culvert and the normal
high-water line of a water body, tributary stream, or upland edge of a wetland. Surface
drainage which is directed to an unscarified buffer strip shall be diffused or spread out to
promote infiltration of the runoff and to minimize channelized flow of the drainage through
the buffer strip.
(7) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be installed in a
manner effective in directing drainage onto unscarified buffer strips before the flow gains
sufficient volume or head to erode the road, driveway, or ditch. To accomplish this, the
following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced along
the road, or driveway at intervals no greater than indicated in the following table:
22
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade is ten
(10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts shall be
placed at approximately a thirty (30) degree angle downslope from a line perpendicular
to the centerline of the road or driveway.
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to allow for
effective functioning, and their inlet and outlet ends shall be stabilized with appropriate
materials.
(8) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular basis to
assure effective functioning.
I
Signs. The following provisions shall govern the use of signs in the Resource Protection,
Stream Protection, Limited Residential and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided that such
signs shall not exceed six (6) square feet in area and shall not exceed two (2) signs per
premises. In the Limited Commercial District, however, such signs shall not exceed sixteen
(16) square feet in area. Signs relating to goods or services not sold or rendered on the
premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per premises, and
shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area relating to
the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to number
provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
23
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water runoff
from the site in excess of the natural predevelopment conditions. Where possible, existing
natural runoff control features, such as berms, swales, terraces and wooded areas, shall be
retained in order to reduce runoff and encourage infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure proper
functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full permit to
be obtained from the DEP prior to construction of a project consisting of 20,000 square
feet or more of impervious area or 5 acres or more of a developed area in an urban
impaired stream watershed or most-at-risk lake watershed, or a project with 1 acre or
more of developed area in any other stream or wetland watershed. A permit-by-rule is
necessary for a project with one acre or more of disturbed area but less than 1 acre
impervious area (20,000 square feet for most-at-risk lakes and urban impaired streams)
and less than 5 acres of developed area. Furthermore, a Maine Construction General
Permit is required if the construction will result in one acre or more of disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the State of
Maine Subsurface Wastewater Disposal Rules, and the following:
a) clearing or removal
of woody vegetation necessary to site a new system and any associated fill extensions, shall
not extend closer than seventy-five (75) feet, horizontal distance, from the normal high-water
line of a water body or the upland edge of a wetland and b) a holding tank is not allowed for
a first-time residential use in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding fill
extensions, to be constructed no less than one hundred (100) horizontal feet from the normal
high-water line of a perennial water body. The minimum setback distance for a new
subsurface disposal system may not be reduced by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public ways
and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not allowed in
a Resource Protection or Stream Protection District, except to provide services to a permitted
use within said district, or except where the applicant demonstrates that no reasonable
alternative exists. Where allowed, such structures and facilities shall be located so as to
minimize any adverse impacts on surrounding uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and related
equipment may be replaced or reconstructed without a permit.
24
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or extent of
mineral resources shall be accomplished by hand sampling, test boring, or other methods which
create minimal disturbance of less than one hundred (100) square feet of ground surface. A
permit from the Code Enforcement Officer shall be required for mineral exploration which
exceeds the above limitation. All excavations, including test pits and holes, shall be immediately
capped, filled or secured by other equally effective measures to restore disturbed areas and to
protect the public health and safety.
Mineral extraction may be permitted under the following conditions:
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a permit
is granted. Such plan shall describe in detail procedures to be undertaken to fulfill the
requirements of Section 15 (M)(4) below.
(2) No part of any extraction operation, including drainage and runoff control features, shall be
permitted within one hundred (100) feet, horizontal distance, of the normal high-water line of
a great pond classified GPA or a river flowing to a great pond classified GPA, and within
seventy-five (75) feet, horizontal distance, of the normal high-water line of any other water
body, tributary stream, or the upland edge of a wetland. Extraction operations shall not be
permitted within fifty (50) feet, horizontal distance, of any property line without written
permission of the owner of such adjacent property.
(3) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one hundred (100)
cubic yards of materials are removed in any consecutive twelve (12) month period, ground
levels and grades shall be established in accordance with the following:
(a) All debris, stumps, and similar material shall be removed for disposal in an approved
location, or shall be buried on-site. Only materials generated on-site may be buried or
covered on-site.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall be
reseeded and stabilized with vegetation native to the area. Additional topsoil or loam
shall be obtained from off-site sources if necessary to complete the stabilization project.
(4) In keeping with the purposes of this Ordinance, the Planning Board may impose such
conditions as are necessary to minimize the adverse impacts associated with mineral
extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure Utilization
Guidelines published by the former Maine Department of Agriculture on November 1, 2001,
and the Nutrient Management Law (7 M.R.S.A. sections 4201-4209).
25
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal distance,
of a great pond classified GPA or a river flowing to a great pond classified GPA, or within
seventy-five (75) feet horizontal distance, of other water bodies, tributary streams, or
wetlands. All manure storage areas within the shoreland zone must be constructed or
modified such that the facility produces no discharge of effluent or contaminated storm
water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000) square
feet in surface area, within the shoreland zone shall require a Conservation Plan to be filed
with the Planning Board. Non-conformance with the provisions of said plan shall be
considered to be a violation of this Ordinance.
NOTE: Assistance in preparing a Conservation Plan may be available through the local Soil and
Water Conservation District office.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal distance, of
the normal high-water line of a great pond classified GPA; within seventy-five (75) feet,
horizontal distance, from other water bodies; nor within twenty-five (25) feet, horizontal
distance, of tributary streams and wetlands. Operations in existence on the effective date of
this ordinance and not in conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred (100)
feet, horizontal distance, of the normal high-water line of a great pond classified GPA;
within seventy-five (75) feet, horizontal distance, of other water bodies; nor within twenty-
five (25) feet, horizontal distance, of tributary streams and wetlands. Livestock grazing
associated with ongoing farm activities, and which are not in conformance with the above
setback provisions may continue, provided that such grazing is conducted in accordance with
a Conservation Plan that has been filed with the Planning Board.
NOTE: 17 M.R.S.A. section 2805(4) requires a municipality to provide the Commissioner of
Agriculture, Food and Rural Resources with a copy of any proposed ordinance that
impacts farm operations. The law further requires the Commissioner to review the
proposed ordinance and advise the municipality if the proposed ordinance would restrict
or prohibit the use of best management practices. A copy of a shoreland zoning
ordinance that regulates no more restrictively than contained in these Guidelines need
not be provided to the Commissioner of Agriculture, Food and Rural Resources.
O.
Timber Harvesting - Statewide Standards [Effective on effective date established in Section
4(B)]
(1) Shoreline integrity and sedimentation.
Persons conducting timber harvesting and related
activities must take reasonable measures to avoid the disruption of shoreline integrity, the
occurrence of sedimentation of water, and the disturbance of water body and tributary stream
banks, water body and tributary stream channels, shorelines, and soil lying within water
bodies, tributary streams and wetlands. If, despite such precautions, the disruption of
shoreline integrity, sedimentation of water, or the disturbance of water body and tributary
26
stream banks, water body and tributary stream channels, shorelines, and soil lying within
water bodies, tributary streams and wetlands occurs, such conditions must be corrected.
(2) Slash treatment. Timber harvesting and related activities shall be conducted such that slash
or debris is not left below the normal high-water line of any water body or tributary stream,
or the upland edge of a wetland. Section 15(O-1)(2) does not apply to minor, incidental
amounts of slash that result from timber harvesting and related activities otherwise
conducted in compliance with this section.
(a) Slash actively used to protect soil from disturbance by equipment or to stabilize exposed
soil, may be left in place, provided that no part thereof extends more than 4 feet above
the ground.
(b) Adjacent to great ponds, rivers and wetlands:
(i) No accumulation of slash shall be left within 50 feet, horizontal distance, of the
normal high-water line or upland edge of a wetland; and
(ii) Between 50 feet and 250 feet, horizontal distance, of the normal high-water line or
upland edge of a wetland, all slash larger than 3 inches in diameter must be disposed
of in such a manner that no part thereof extends more than 4 feet above the ground.
(3) Timber harvesting and related activities must leave adequate tree cover and shall be
conducted so that a well-distributed stand of trees is retained. This requirement may be
satisfied by following one of the following three options:
(a) Option 1 (40% volume removal), as follows:
(i) Harvesting of no more than 40 percent of the total volume on each acre of trees 4.5
inches DBH or greater in any 10 year period is allowed. Volume may be considered
to be equivalent to basal area;
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including
existing ground cover, must be maintained; and,
(iii) Within 75 feet, horizontal distance, of the normal high-water line of rivers, streams,
and great ponds, and within 75 feet, horizontal distance, of the upland edge of a
freshwater wetlands, there must be no cleared openings. At distances greater than 75
feet, horizontal distance, of the normal high-water line of a river or great pond or
upland edge of a wetland, timber harvesting and related activities must not create
single cleared openings greater than 14,000 square feet in the forest canopy. Where
such openings exceed 10,000 square feet, they must be at least 100 feet, horizontal
distance, apart. Such cleared openings will be included in the calculation of total
volume removal. Volume may be considered equivalent to basal area.
(b) Option 2 (60 square foot basal area retention), as follows:
(i) The residual stand must contain an average basal area of at least 60 square feet per
acre of woody vegetation greater than or equal to 1.0 inch DBH, of which 40 square
feet per acre must be greater than or equal to 4.5 inches DBH;
27
(ii) A well-distributed stand of trees which is windfirm, and other vegetation including
existing ground cover, must be maintained; and,
(iii)Within 75 feet, horizontal distance, of the normal high-water line of water bodies and
within 75 feet, horizontal distance, of the upland edge of wetlands, there must be no
cleared openings. At distances greater than 75 feet, horizontal distance, of the normal
high-water line of a river or great pond, or upland edge of a wetland, timber
harvesting and related activities must not create single cleared openings greater than
14,000 square feet in the forest canopy. Where such openings exceed 10,000 square
feet, they must be at least 100 feet, horizontal distance, apart. Such cleared openings
will be included in the calculation of the average basal area. Volume may be
considered equivalent to basal area.
(c) Option 3 (Outcome based), which requires: An alternative method proposed in an
application, signed by a Licensed Forester or certified wildlife professional, submitted by
the landowner or designated agent to the State of Maine Department of Conservation's
Bureau of Forestry (Bureau) for review and approval, which provides equal or better
protection of the shoreland area than this rule.
Landowners must designate on the Forest Operations Notification form required by 12 M.R.S.A.
chapter 805, subchapter 5 which option they choose to use. If landowners choose Option 1 or
Option 2, compliance will be determined solely on the criteria for the option chosen. If
landowners choose Option 3, timber harvesting and related activities may not begin until the
Bureau has approved the alternative method.
The Bureau may verify that adequate tree cover and a well-distributed stand of trees is retained
through a field procedure that uses sample plots that are located randomly or systematically to
provide a fair representation of the harvest area.
(4) Skid trails, yards, and equipment operation. This requirement applies to the construction,
maintenance, and use of skid trails and yards in shoreland areas.
(a) Equipment used in timber harvesting and related activities shall not use river, stream or
tributary stream channels as travel routes except when surface waters are frozen and snow
covered, and the activity will not result in any ground disturbance.
(b) Skid trails and yards must be designed and constructed to prevent sediment and concentrated
water runoff from entering a water body, tributary stream, or wetland. Upon termination of
their use, skid trails and yards must be stabilized.
(c) Setbacks:
(i) Equipment must be operated to avoid the exposure of mineral soil within 25 feet,
horizontal distance, of any water body, tributary stream, or wetland. On slopes of 10
percent or greater, the setback for equipment operation must be increased by 20 feet,
horizontal distance, plus an additional 10 feet, horizontal distance, for each 5 percent
increase in slope above 10 percent. Where slopes fall away from the resource, no
increase in the 25-foot setback is required.
28
(ii) Where such setbacks are impracticable, appropriate techniques shall be used to avoid
sedimentation of the water body, tributary stream or wetland. Such techniques may
include the installation of sump holes or settling basins, and/or the effective use of
additional ditch relief culverts and ditch water turnouts placed to avoid sedimentation of
the water body, tributary stream, or wetland. If, despite such precautions, sedimentation
or the disruption of shoreline integrity occurs, such conditions must be corrected.
(5) Land Management Roads. Land management roads, including approaches to crossings of water
bodies, tributary stream channels, and wetlands, ditches and other related structures, must be
designed, constructed, and maintained to prevent sediment and concentrated water runoff from
directly entering the water body, tributary stream or wetland. Surface water on or adjacent to
water crossing approaches must be diverted through vegetative filter strips to avoid
sedimentation of the watercourse or wetland. Because roadside ditches may not extend to the
resource being crossed, vegetative filter strips must be established in accordance with the setback
requirements in Section 15(O-1)(7) of this rule.
(a) Land management roads and associated ditches, excavation, and fill must be set back at least:
(i) 100 feet, horizontal distance, from the normal high-water line of a great pond, river or
wetland;
(ii) 50 feet, horizontal distance, from the normal high-water line of streams; and
(iii) 25 feet, horizontal distance, from the normal high-water line of tributary streams
(b) The minimum 100 foot setback specified in Section 15(O-1)(5)(a)(i) above may be reduced
to no less than 50 feet, horizontal distance, and the 50 foot setback specified in
Section 15(O-1)(5)(a)(ii) above may be reduced to no less than 25 feet, horizontal distance,
if, prior to construction, the landowner or the landowner's designated agent demonstrates to
the Planning Board's satisfaction that no reasonable alternative exists and that appropriate
techniques will be used to prevent sedimentation of the water body, tributary stream, or
wetland. Such techniques may include, but are not limited to, the installation of settling
basins, and/or the effective use of additional ditch relief culverts and turnouts placed to avoid
sedimentation of the water body, tributary stream or wetland. If, despite such precautions,
sedimentation or the disruption of shoreline integrity occurs, such conditions must be
corrected.
(c) On slopes of 10 percent or greater, the land management road setback must be increased by
at least 20 feet, horizontal distance, plus an additional 10 feet, horizontal distance, for each 5
percent increase in slope above 10 percent.
(d) New land management roads are not allowed within a Resource Protection District, unless,
prior to construction, the landowner or the landowner's designated agent makes a clear
demonstration to the Planning Board's satisfaction that no reasonable alternative route exists
outside the shoreland zone, and that the new road must be set back as far as practicable from
the normal high-water line and screened from the river by existing vegetation.
(e) Ditches, culverts, bridges, dips, water turnouts and other water control installations
associated with roads must be maintained on a regular basis to assure effective functioning.
Drainage structures shall deliver a dispersed flow of water into an unscarified filter strip no
29
less than the width indicated in the setback requirements in Section 15(O-1)(7). Where such
a filter strip is impracticable, appropriate techniques shall be used to avoid sedimentation of
the water body, tributary stream, or wetland. Such techniques may include the installation of
sump holes or settling basins, and/or the effective use of additional ditch relief culverts and
ditch water turnouts placed to avoid sedimentation of the water body, tributary stream, or
wetland. If, despite such precautions, sedimentation or the disruption of shoreline integrity
occurs, such conditions must be corrected.
(f) Road closeout and discontinuance. Maintenance of the water control installations required in
Section 15(O-1)(5)(e) must continue until use of the road is discontinued and the road is put
to bed by effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to avoid surface water flowing over or under the water bar,
and extending a sufficient distance beyond the traveled way so that water does not reenter the
road surface.
(g) Upgrading existing roads. Extension or enlargement of presently existing roads must
conform to the provisions of Section 15(O-1). Any nonconforming existing road may
continue to exist and to be maintained, as long as the nonconforming conditions are not made
more nonconforming.
(h) Exception. Extension or enlargement of presently existing roads need not conform to the
setback requirements of Section 15(O-1)(5)(a) if, prior to extension or enlargement, the
landowner or the landowner's designated agent demonstrates to the Planning Board's
satisfaction that no reasonable alternative exists and that appropriate techniques will be used
to prevent sedimentation of the water body, tributary stream, or wetland. Such techniques
may include, but are not limited to, the installation of settling basins, and/or the effective use
of additional ditch relief culverts and turnouts placed to avoid sedimentation of the water
body, tributary stream, or wetland. If, despite such precautions, sedimentation or the
disruption of shoreline integrity occurs, such conditions must be corrected.
(i) Additional measures. In addition to the foregoing minimum requirements, persons
undertaking construction and maintenance of roads and river, stream and tributary stream
crossings must take reasonable measures to avoid sedimentation of surface waters.
(6) Crossings of waterbodies. Crossings of rivers, streams, and tributary streams must allow for fish
passage at all times of the year, must not impound water, and must allow for the maintenance of
normal flows.
(a) Determination of flow. Provided they are properly applied and used for the circumstances for
which they are designed, methods including but not limited to the following are acceptable as
a means of calculating the 10 year and 25 year frequency water flows and thereby
determining water crossing sizes as required in Section 15(O-1): The United States
Geological Survey (USGS) Methods; specifically: Hodgkins, G. 1999. Estimating the
Magnitude of Peak Flows for Streams in Maine for Selected Recurrence Intervals. U.S.
Geological Survey. Water Resources Investigations Report 99-4008. 45 pp.
(b) Upgrading existing water crossings. Extension or enlargement of presently existing water
crossings must conform to the provisions of Section 15(O-1). Any nonconforming existing
water crossing may continue to exist and be maintained, as long as the nonconforming
30
conditions are not made more nonconforming; however, any maintenance or repair work
done below the normal high-water line must conform to the provisions of Section 15(O-1).
(c) Other Agency Permits. Any timber harvesting and related activities involving the design,
construction, and maintenance of crossings on waterbodies other than a river, stream or
tributary stream may require a permit from the Land Use Regulation Commission, the
Department of Environmental Protection, or the US Army Corps of Engineers.
(d) Any timber harvesting and related activities involving the design, construction, and
maintenance of crossings of wetlands identified by the Department of Inland Fisheries and
Wildlife as essential wildlife habitat require prior consultation with the Department of Inland
Fisheries and Wildlife.
(e) Notice to Bureau of Forestry. Written notice of all water crossing construction maintenance,
alteration and replacement activities in shoreland areas must be given to the Bureau prior to
the commencement of such activities. Such notice must contain all information required by
the Bureau, including:
(i)
a map showing the location of all proposed permanent crossings;
(ii)
the GPS location of all proposed permanent crossings;
(iii) for any temporary or permanent crossing that requires a permit from state or
federal agencies, a copy of the approved permit or permits; and
(iv) a statement signed by the responsible party that all temporary and permanent
crossings will be constructed, maintained, and closed out in accordance with the
requirements of this Section.
(f) Water crossing standards. All crossings of rivers require a bridge or culvert sized according
to the requirements of Section 15(O-1)(6)(g)) below. Streams and tributary streams may be
crossed using temporary structures that are not bridges or culverts provided:
(i) concentrated water runoff does not enter the stream or tributary stream;
(ii) sedimentation of surface waters is reasonably avoided;
(iii) there is no substantial disturbance of the bank, or stream or tributary stream channel;
(iv) fish passage is not impeded; and,
(v) water flow is not unreasonably impeded.
Subject to Section 15(O-1)(6)(f)(i-v) above, skid trail crossings of streams and tributary
streams when channels of such streams and tributary streams are frozen and snow-covered or
are composed of a hard surface which will not be eroded or otherwise damaged are not
required to use permanent or temporary structures.
(g) Bridge and Culvert Sizing. For crossings of river, stream and tributary stream channels with
a bridge or culvert, the following requirements apply:
(i) Bridges and culverts must be installed and maintained to provide an opening sufficient in
size and structure to accommodate 10 year frequency water flows or with a cross-
sectional area at least equal to 2 1/2 times the cross-sectional area of the river, stream, or
tributary stream channel.
31
(ii) Temporary bridge and culvert sizes may be smaller than provided in Section 15(O-
1)(6)(g)(i) if techniques are effectively employed such that in the event of culvert or
bridge failure, the natural course of water flow is maintained and sedimentation of the
water body or tributary stream is avoided. Such crossing structures must be at least as
wide as the channel and placed above the normal high-water line. Techniques may
include, but are not limited to, the effective use of any, a combination of, or all of the
following:
1. use of temporary skidder bridges;
2. removing culverts prior to the onset of frozen ground conditions;
3. using water bars in conjunction with culverts;
4. using road dips in conjunction with culverts.
(iii)
Culverts utilized in river, stream and tributary stream crossings must:
1. be installed at or below river, stream or tributary stream bed elevation;
2. be seated on firm ground;
3. have soil compacted at least halfway up the side of the culvert;
4. be covered by soil to a minimum depth of 1 foot or according to the
culvert manufacturer's specifications, whichever is greater; and
5. have a headwall at the inlet end which is adequately stabilized by riprap
or other suitable means to reasonably avoid erosion of material around the
culvert.
(iv)
River, stream and tributary stream crossings allowed under Section 15(O-1), but
located in flood hazard areas (i.e. A zones) as identified on a community's Flood
Insurance Rate Maps (FIRM) or Flood Hazard Boundary Maps (FHBM), must be
designed and constructed under the stricter standards contained in that community's
National Flood Insurance Program (NFIP). For example, a water crossing may be
required to pass a 100-year flood event.
(v)
Exception. Skid trail crossings of tributary streams within shoreland areas and
wetlands adjacent to such streams may be undertaken in a manner not in conformity
with the requirements of the foregoing subsections provided persons conducting such
activities take reasonable measures to avoid the disruption of shoreline integrity, the
occurrence of sedimentation of water, and the disturbance of stream banks, stream
channels, shorelines, and soil lying within ponds and wetlands. If, despite such
precautions, the disruption of shoreline integrity, sedimentation of water, or the
disturbance of stream banks, stream channels, shorelines, and soil lying within ponds
and wetlands occurs, such conditions must be corrected.
(h) Skid trail closeout. Upon completion of timber harvesting and related activities, or upon the
expiration of a Forest Operations Notification, whichever is earlier, the following
requirements apply:
(i)
Bridges and culverts installed for river, stream and tributary stream crossings by skid
trails must either be removed and areas of exposed soil stabilized, or upgraded to
comply
with
the
closeout
standards
for
land
management
roads
in
Section15(O-1)(6)(i) below.
32
(ii)
Water crossing structures that are not bridges or culverts must either be removed
immediately following timber harvesting and related activities, or, if frozen into the
river, stream or tributary stream bed or bank, as soon as practical after snowmelt.
(iii)
River, stream and tributary stream channels, banks and approaches to crossings of
water bodies and tributary streams must be immediately stabilized on completion of
harvest, or if the ground is frozen and/or snow-covered, as soon as practical after
snowmelt. If, despite such precautions, sedimentation or the disruption of shoreline
integrity occurs, such conditions must be corrected.
(i) Land management road closeout. Maintenance of the water control features must continue
until use of the road is discontinued and the road is put to bed by taking the following
actions:
(i) Effective installation of water bars or other adequate road drainage structures at
appropriate intervals, constructed to reasonably avoid surface water flowing over or
under the water bar, and extending sufficient distance beyond the traveled way so that
water does not reenter the road surface.
(ii) Water crossing structures must be appropriately sized or dismantled and removed in a
manner that reasonably avoids sedimentation of the water body or tributary stream.
(iii) Any bridge or water crossing culvert in roads to be discontinued shall satisfy one of the
following requirements:
1. it shall be designed to provide an opening sufficient in size and structure to
accommodate 25 year frequency water flows;
2. it shall be designed to provide an opening with a cross-sectional area at least 3 1/2
times the cross-sectional area of the river, stream or tributary stream channel; or
3. it shall be dismantled and removed in a fashion to reasonably avoid sedimentation of
the river, stream or tributary stream.
If, despite such precautions, sedimentation or the disruption of shoreline integrity occurs,
such conditions must be corrected.
(7) Slope Table
Filter strips, skid trail setbacks, and land management road setbacks must be maintained as
specified in Section 15(O-1), but in no case shall be less than shown in the following table.
Average slope of land between exposed mineral
Width of strip between exposed
soil and the shoreline (percent)
mineral soil and shoreline
(feet along surface of the ground)
0
25
10
45
33
20
65
30
85
40
105
50
125
60
145
70
165
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending 75 feet, horizontal distance, inland from the
normal high-water line, except to remove safety hazard trees as described in Section Q.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation shall be
limited to that which is necessary for uses expressly authorized in that district.
(2) Except in areas as described in Section P(1), above, within a strip of land extending one-
hundred (100) feet, horizontal distance, inland from the normal high-water line of a great
pond classified GPA or a river flowing to a great pond classified GPA, or within a strip
extending seventy-five (75) feet, horizontal distance, from any other water body, tributary
stream, or the upland edge of a wetland, a buffer strip of vegetation shall be preserved as
follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest canopy (or
other existing woody vegetation if a forested canopy is not present) as measured from the
outer limits of the tree or shrub crown. However, a single footpath not to exceed six (6)
feet in width as measured between tree trunks and/or shrub stems is allowed for
accessing the shoreline provided that a cleared line of sight to the water through the
buffer strip is not created.
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the purposes of
Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a great pond classified
GPA or a river or stream flowing to a great pond classified GPA, shall be defined as
maintaining a rating score of 24 or more in each 25-foot by 50-foot rectangular (1250
square feet) area as determined by the following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - < 4 in.
1
4 - <8 in.
2
8-< 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-distributed stand
of trees" is defined as maintaining a minimum rating score of 16 per 25-foot by 50-foot
rectangular area.
The following shall govern in applying this point system:
34
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation removed
except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed down to
the minimum points required or as otherwise allowed by is Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot by 50-
foot rectangular area may consist of trees greater than 12 inches in diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as retaining
existing vegetation under three (3) feet in height and other ground cover and retaining at
least five (5) saplings less than two (2) inches in diameter at four and one half (4 ½) feet
above ground level for each 25-foot by 50-foot rectangle area. If five saplings do not
exist, no woody stems less than two (2) inches in diameter can be removed until 5
saplings have been recruited into the plot.
Notwithstanding the above provisions, no more than 40% of the total volume of trees
four (4) inches or more in diameter, measured at 4 1/2 feet above ground level may be
removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under three (3)
feet in height and other ground cover, including leaf litter and the forest duff layer, shall
not be cut, covered, or removed, except to provide for a footpath or other permitted uses
as described in Section 15(P) paragraphs (2) and (2)(a) above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-damaged,
dead or hazard trees results in the creation of cleared openings, these openings shall be
replanted with native tree species in accordance with section Q, below, unless existing
new tree growth is present.
(f) In order to maintain the vegetation in the shoreline buffer, clearing or removal of
vegetation for allowed activities, including associated construction and related
equipment operation, within or outside the shoreline buffer, must comply with the
requirements of Section 15 P(2).
Section 15(P)(2) does not apply to those portions of public recreational facilities adjacent to
public swimming areas as long as cleared areas are limited to the minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great pond
classified GPA or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of any other water body, tributary
stream, or the upland edge of a wetland, there shall be allowed on any lot, in any ten (10)
year period, selective cutting of not more than forty (40) percent of the volume of trees four
(4) inches or more in diameter, measured 4 1/2 feet above ground level. Tree removal in
conjunction with the development of permitted uses shall be included in the forty (40)
35
percent calculation. For the purposes of these standards volume may be considered to be
equivalent to basal area.
In no event shall cleared openings for any purpose, including but not limited to, principal and
accessory structures, driveways, lawns and sewage disposal areas, exceed in the aggregate,
25% of the lot area within the shoreland zone or ten thousand (10,000) square feet,
whichever is greater, including land previously cleared. This provision applies to the portion
of a lot within the shoreland zone, including the buffer area, but shall not apply to the
General Development Districts.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not be
enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or other
woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Hazard Trees, Storm-Damaged Trees, and Dead Tree Removal.
(1) Hazard trees in the shoreland zone may be removed without a permit after consultation with
the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, if the removal of a hazard tree results in a cleared opening in
the tree canopy greater than two hundred and fifty (250) square feet, replacement with
native tree species is required, unless there is new tree growth already present. New tree
growth must be as near as practicable to where the hazard tree was removed and be at
least two (2) inches in diameter, measured at four and one half (4.5) feet above the
ground level. If new growth is not present, then replacement trees shall consist of native
species and be at least four (4) feet in height, and be no less than two (2) inches in
diameter. Stumps may not be removed.
(b) Outside of the shoreline buffer, when the removal of hazard trees exceeds forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured at four and
one half (4.5) feet above ground level in any ten (10) year period, and/or results in
cleared openings exceeding twenty-five (25) percent of the lot area within the shoreland
zone, or ten thousand (10,000) square feet, whichever is greater, replacement with native
tree species is required, unless there is new tree growth already present. New tree growth
must be as near as practicable to where the hazard tree was removed and be at least two
(2) inches in diameter, measured at
four and one half (4.5) feet above the ground level. If new growth is not present, then
replacement trees shall consist of native species and be at least two (2) inches in
diameter, measured at four and one half(4.5) feet above the ground level.
(c) The removal of standing dead trees, resulting from natural causes, is permissible without
the need for replanting or a permit, as long as the removal does not result in the creation
of new lawn areas, or other permanently cleared areas, and stumps are not removed. For
the purposes of this provision dead trees are those trees that contain no foliage during the
growing season.
36
(d) The Code Enforcement Officer may require the property owner to submit an evaluation
from a licensed forester or arborist before any hazard tree can be removed within the
shoreland zone.
(e) The Code Enforcement Officer may require more than a one-for-one replacement for
hazard trees removed that exceed eight (8) inches in diameter measured at four and one
half (4.5) feet above the ground level.
(2) Storm-damaged trees in the shoreland zone may be removed without a permit after
consultation with the Code Enforcement Officer if the following requirements are met:
(a) Within the shoreline buffer, when the removal of storm-damaged trees results in a
cleared opening in the tree canopy greater than two hundred and fifty (250) square feet,
replanting is not required, but the area shall be required to naturally revegetate, and the
following requirements must be met:
(i) The area from which a storm-damaged tree is removed does not result in new lawn
areas, or other permanently cleared areas;
(ii) Stumps from the storm-damaged trees may not be removed;
(iii) Limbs damaged from a storm event may be pruned even if they extend beyond the
bottom one-third (1/3) of the tree; and
(iv) If after one growing season, no natural regeneration or regrowth is present,
replanting of native tree seedlings or saplings is required at a density of one seedling
per every eighty (80) square feet of lost canopy.
(b) Outside of the shoreline buffer, if the removal of storm damaged trees exceeds 40% of
the volume of trees four (4) inches or more in diameter, measured at four and one half
(4.5) feet above the ground level in any ten (10) year period, or results, in the aggregate,
in cleared openings exceeding 25% of the lot area within the shoreland zone or ten
thousand (10,000) square feet, whichever is greater, and no natural regeneration occurs
within one growing season, then native tree seedlings or saplings shall be replanted on a
one-for-one basis.
R. Exemptions to Clearing and Vegetation Removal Requirements
The following activities are exempt from the clearing and vegetation removal standards set forth in
Section 15(P), provided that all other applicable requirements of this chapter are complied with, and
the removal of vegetation is limited to that which is necessary:
(1) The removal of vegetation that occurs at least once every two (2) years for the maintenance
of legally existing areas that do not comply with the vegetation standards in this chapter,
such as but not limited to cleared openings in the canopy or fields. Such areas shall not be
enlarged, except as allowed by this section. If any of these areas, due to lack of removal of
vegetation every two (2) years, reverts back to primarily woody vegetation, the requirements
of Section 15(P) apply;
37
(2) The removal of vegetation from the location of allowed structures or allowed uses, when the
shoreline setback requirements of section 15(B) are not applicable;
(3) The removal of vegetation from the location of public swimming areas associated with an
allowed public recreational facility;
(4) The removal of vegetation associated with allowed agricultural uses, provided best
management practices are utilized, and provided all requirements of section 15(N) are
complied with;
(5) The removal of vegetation associated with brownfields or voluntary response action
program (VRAP) projects provided that the removal of vegetation is necessary for
remediation activities to clean-up contamination on a site in a general development
district, or other equivalent zoning district approved by the Commissioner that is part of a
state or federal brownfields program or a voluntary response action program pursuant 38
M.R.S.A section 343-E, and that is located along a river that does not flow to a great pond
classified as GPA pursuant to 38 M.R.S.A section 465-A.
(6) The removal of non-native invasive vegetation species, provided the following minimum
requirements are met:
(a) If removal of vegetation occurs via wheeled or tracked motorized equipment, the
wheeled or tracked motorized equipment is operated and stored at least twenty-five (25)
feet, horizontal distance, from the shoreline, except that wheeled or tracked equipment
may be operated or stored on existing structural surfaces, such as pavement or gravel;
(b) Removal of vegetation within twenty-five (25) feet, horizontal distance, from the
shoreline occurs via hand tools; and
(c) If applicable clearing and vegetation removal standards are exceeded due to the removal
of non-native invasive species vegetation, the area shall be revegetated with native
species to achieve compliance.
(7) The removal of vegetation associated with emergency response activities conducted by the
Department, the U.S. Environmental Protection Agency, and their agents.
S. Revegetation Requirements.
When revegetation is required in response to violations of the vegetation standards set forth in
Section 15(P), to address the removal of non- native invasive species of vegetation, or as a
mechanism to allow for development that may otherwise not be permissible due to the vegetation
standards, including removal of vegetation in conjunction with a shoreline stabilization project, the
revegation must comply with the following requirements.
(1) The property owner must submit a revegetation plan, prepared with and signed by a qualified
professional, that describes revegetation activities and maintenance. The plan must include a
scaled site plan, depicting where vegetation was, or is to be removed, where existing
vegetation is to remain, and where vegetation is to be planted, including a list of all
vegetation to be planted.
38
(2) Revegetation must occur along the same segment of shoreline and in the same area where
vegetation was removed and at a density comparable to the pre-existing vegetation, except
where a shoreline stabilization activity does not allow revegetation to occur in the same area
and at a density comparable to the pre-existing vegetation, in which case revegetation must
occur along the same segment of shoreline and as close as possible to the area where
vegetation was removed:
(3) If part of a permitted activity, revegetation shall occur before the expiration of the permit. If
the activity or revegetation is not completed before the expiration of the permit, a new
revegetation plan shall be submitted with any renewal or new permit application.
(4) Revegetation activities must meet the following requirements for trees and saplings:
(a) All trees and saplings removed must be replaced with native noninvasive species;
(b) Replacement vegetation must at a minimum consist of saplings;
(c) If more than three (3) trees or saplings are planted, then at least three (3) different
species shall be used;
(d) No one species shall make up 50% or more of the number of trees and saplings planted;
(e) If revegetation is required for a shoreline stabilization project, and it is not possible to
plant trees and saplings in the same area where trees or saplings were removed, then
trees or sapling must be planted in a location that effectively reestablishes the screening
between the shoreline and structures; and
(f) A survival rate of at least eighty (80) percent of planted trees or saplings is required for a
minimum five (5) years period.
(5) Revegetation activities must meet the following requirements for woody vegetation and other
vegetation under three (3) feet in height:
(a) All woody vegetation and vegetation under three (3) feet in height must be replaced with
native noninvasive species of woody vegetation and vegetation under three (3) feet in
height as applicable;
(b) Woody vegetation and vegetation under three (3) feet in height shall be planted in
quantities and variety sufficient to prevent erosion and provide for effective infiltration
of stormwater;
(c) If more than three (3) woody vegetation plants are to be planted, then at least three (3)
different species shall be planted;
(d) No one species shall make up 50% or more of the number of planted woody vegetation
plants; and
39
(e) Survival of planted woody vegetation and vegetation under three feet in height must be
sufficient to remain in compliance with the standards contained within this chapter for
minimum of five (5) years
(6) Revegetation activities must meet the following requirements for ground vegetation and
ground cover:
(a) All ground vegetation and ground cover removed must be replaced with native
herbaceous vegetation, in quantities and variety sufficient to prevent erosion and provide
for effective infiltration of stormwater;
(b) Where necessary due to a lack of sufficient ground cover, an area must be supplemented
with a minimum four (4) inch depth of leaf mulch and/or bark mulch to prevent erosion
and provide for effective infiltration of stormwater; and
(c) Survival and functionality of ground vegetation and ground cover must be sufficient to
remain in compliance with the standards contained within this chapter for minimum of
five (5) years.
T. Erosion and Sedimentation Control
(1) All activities which involve filling, grading, excavation or other similar activities which
result in unstabilized soil conditions and which require a permit shall also require a written
soil erosion and sedimentation control plan. The plan shall be submitted to the permitting
authority for approval and shall include, where applicable, provisions for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit with the
topography and soils of the site. Areas of steep slopes where high cuts and fills may be
required shall be avoided wherever possible, and natural contours shall be followed as
closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the proposed project
involving land disturbance, and shall be in operation during all stages of the activity. The
amount of exposed soil at every phase of construction shall be minimized to reduce the
potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one (1) week
from the time it was last actively worked, by use of riprap, sod, seed, and mulch, or other
effective measures. In all cases permanent stabilization shall occur within nine (9) months of
the initial date of exposure. In addition:
40
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five hundred
(500) square feet and shall be maintained until a catch of vegetation is established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation into the
water. Such measures may include the use of staked hay bales and/or silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from erosion
from water flowing through them. Drainageways shall be designed and constructed in order
to carry water from a twenty five (25) year storm or greater, and shall be stabilized with
vegetation or lined with riprap.
U. Soils. All land uses shall be located on soils in or upon which the proposed uses or structures can
be established or maintained without causing adverse environmental impacts, including severe
erosion, mass soil movement, improper drainage, and water pollution, whether during or after
construction. Proposed uses requiring subsurface waste disposal, and commercial or industrial
development and other similar intensive land uses, shall require a soils report based on an on-site
investigation and be prepared by state-certified professionals. Certified persons may include
Maine Certified Soil Scientists, Maine Registered Professional Engineers, Maine State Certified
Geologists and other persons who have training and experience in the recognition and evaluation
of soil properties. The report shall be based upon the analysis of the characteristics of the soil
and surrounding land and water areas, maximum ground water elevation, presence of ledge,
drainage conditions, and other pertinent data which the evaluator deems appropriate. The soils
report shall include recommendations for a proposed use to counteract soil limitations where they
exist.
V. Water Quality. No activity shall deposit on or into the ground or discharge to the waters of the
State any pollutant that, by itself or in combination with other activities or substances, will
impair designated uses or the water classification of the water body, tributary stream or wetland.
W. Archaeological Site. Any proposed land use activity involving structural development or soil
disturbance on or adjacent to sites listed on, or eligible to be listed on the National Register of
Historic Places, as determined by the permitting authority, shall be submitted by the applicant to
the Maine Historic Preservation Commission for review and comment, at least twenty (20) days
prior to action being taken by the permitting authority. The permitting authority shall consider
comments received from the Commission prior to rendering a decision on the application.
NOTE: Municipal officials should contact the Maine Historic Preservation Commission for the
listing and location of Historic Places in their community.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or reappointed
annually by July 1st.
41
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the provisions of
30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the provisions of
State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without first
obtaining a permit, engage in any activity or use of land or structure requiring a permit in the
district in which such activity or use would occur; or expand, change, or replace an existing use
or structure; or renew a discontinued nonconforming use. A person who is issued a permit
pursuant to this Ordinance shall have a copy of the permit on site while the work authorized by
the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being replaced;
(b) The replacement culvert is not longer than 75 feet; and
(c) Adequate erosion control measures are taken to prevent sedimentation of the water, and
the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation is
conducted by an archaeologist listed on the State Historic Preservation Officer's level 1 or
level 2 approved list, and unreasonable erosion and sedimentation is prevented by means of
adequate and timely temporary and permanent stabilization measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit required by
other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site plan,
on a form provided by the municipality, to the appropriate official as indicated in Section 14.
(2) All applications shall be signed by an owner or individual who can show evidence of right,
title or interest in the property or by an agent, representative, tenant, or contractor of the
owner with authorization from the owner to apply for a permit hereunder, certifying that the
information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board, as
appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid subsurface sewerage disposal system
permit, including the site evaluation approved by the Plumbing Inspector, shall be submitted
whenever the nature of the proposed structure or use would require the installation of a
subsurface sewage disposal system.
42
(5) When an excavation contractor will perform an activity that requires or results in more than
one (1) cubic yard of soil disturbance, the person responsible for management of erosion and
sedimentation control practices at the site must be certified in erosion control practices by
the Maine Department of Environmental Protection. This person must be present at the site
each day earthmoving activity occurs for a duration that is sufficient to ensure that proper
erosion and sedimentation control practices are followed. This is required until erosion and
sedimentation control measures have been installed, which will either stay in place
permantently or stay in place until the area is sufficiently covered with vegetation necessary
to prevent soil erosion. The name and certification number of the person who will oversee
the activity causing or resulting in soil disturbance shall be included on the permit
application. This requirement does not apply to a person or firm engaged in agriculture or
timber harvesting if best management practices for erosion and sedimentation control are
used; and municipal, state and federal employees engaged in projects associated with that
employment.
D. Procedure for Administering Permits. Within 35 days of the date of receiving a written
application, the Planning Board or Code Enforcement Officer, as indicated in Section 14, shall
notify the applicant in writing either that the application is a complete application, or, if the
application is incomplete, that specified additional material is needed to make the application
complete. The Planning Board or the Code Enforcement Officer, as appropriate, shall approve,
approve with conditions, or deny all permit applications in writing within 35 days of receiving a
completed application. However, if the Planning Board has a waiting list of applications, a
decision on the application shall occur within 35 days after the first available date on the
Planning Board's agenda following receipt of the completed application, or within 35 days of the
public hearing, if the proposed use or structure is found to be in conformance with the purposes
and provisions of this Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
After the submission of a complete application to the Planning Board, the Board shall approve an
application or approve it with conditions if it makes a positive finding based on the information
presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland waters;
(6) Will protect archaeological and historic resources as designated in the comprehensive plan;
(7) Will avoid problems associated with floodplain development and use; and
43
(8) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as conditions shall be
stated in writing. No approval shall be granted for an application involving a structure if the
structure would be located in an unapproved subdivision or would violate any other local
ordinance, or regulation or statute administered by the municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above, excepting
structure setback requirements, the Planning Board may approve a permit for a single family
residential structure in a Resource Protection District provided that the applicant demonstrates
that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource Protection
District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and recorded
in the registry of deeds of the county in which the lot is located before the adoption of the
Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100-year flood-plain along rivers and artificially
formed great ponds along rivers, based on detailed flood insurance studies and as
delineated on the Federal Emergency Management Agency's Flood Boundary and
Floodway Maps and Flood Insurance Rate Maps; all buildings, including basements, are
elevated at least one foot above the 100-year flood-plain elevation; and the development
is otherwise in compliance with any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency Maps, it is
deemed to be 1/2 the width of the 100-year flood-plain.
(4) The total footprint, including cantilevered or similar overhanging extensions, of all principal
and accessory structures is limited to a maximum of 1,500 square feet. This limitation shall
not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the normal
high-water line of a water body, tributary stream or upland edge of a wetland to the greatest
practical extent, but not less than 100 feet, horizontal distance. In determining the greatest
practical extent, the Planning Board shall consider the depth of the lot, the slope of the land,
the potential for soil erosion, the type and amount of vegetation to be removed, the proposed
building site's elevation in regard to the flood-plain, and its proximity to moderate-value and
high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a substantial
start is not made in construction or in the use of the property during that period. If a substantial
start is made within one year of the issuance of the permit, the applicant shall have one additional
year to complete the project, at which time the permit shall expire.
44
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any
utility company of any kind may not install services to any new structure located in the shoreland
zone unless written authorization attesting to the validity and currency of all local permits
required under this or any previous Ordinance has been issued by the appropriate municipal
officials or other written arrangements have been made between the municipal officials and the
utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the following
powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an appellate basis,
where it is alleged by an aggrieved party that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Planning Board in the
administration of this Ordinance; and to hear and decide administrative appeals on a de
novo basis where it is alleged by an aggrieved party that there is an error in any order,
requirement, decision or determination made by, or failure to act by, the Code Enforcement
Officer in his or her review of and action on a permit application under this Ordinance.
Any order, requirement, decision or determination made, or failure to act, in the
enforcement of this ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set forth in
this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
(a) Variances may be granted only from dimensional requirements including, but not limited
to, lot width, structure height, percent of lot coverage, and setback requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited by this
Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except for the
specific provision which has created the non-conformity and from which relief is
sought; and
(ii) The strict application of the terms of this Ordinance would result in undue hardship.
The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a variance is
granted;
b. That the need for a variance is due to the unique circumstances of the property and
not to the general conditions in the neighborhood;
45
c. That the granting of a variance will not alter the essential character of the locality;
and
d. That the hardship is not the result of action taken by the applicant or a prior owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals, or the Codes
Enforcement Officer if authorized in accordance with 30-A MRSA 4353-A, may grant a
variance to an owner of a residential dwelling for the purpose of making that dwelling
accessible to a person with a disability who resides in or regularly uses the dwelling. The
board shall restrict any variance granted under this subsection solely to the installation of
equipment or the construction of structures necessary for access to or egress from the
dwelling by the person with the disability. The board may impose conditions on the
variance, including limiting the variance to the duration of the disability or to the time that
the person with the disability lives in the dwelling. The term "structures necessary for
access to or egress from the dwelling" shall include railing, wall or roof systems necessary
for the safety or effectiveness of the structure. Any permit issued pursuant to this
subsection is subjet to Section 16(H)(2)(f) and 16 (H)(4)(b)(iv) below.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in order to
ensure conformance with the purposes and provisions of this Ordinance to the greatest
extent possible, and in doing so may impose such conditions to a variance as it deems
necessary. The party receiving the variance shall comply with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting information
supplied by the applicant, shall be forwarded by the municipal officials to the
Commissioner of the Department of Environmental Protection at least twenty (20) days
prior to action by the Board of Appeals. Any comments received from the Commissioner
prior to the action by the Board of Appeals shall be made part of the record and shall be
taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the Board of
Appeals shall hold a "de novo" hearing. At this time the Board may receive and consider new
evidence and testimony, be it oral or written. When acting in a "de novo" capacity the Board of
Appeals shall hear and decide the matter afresh, undertaking its own independent analysis of
evidence and the law, and reaching its own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an appellate
hearing, and may reverse the decision of the Planning Board only upon finding that the
decision was contrary to specific provisions of the Ordinance or contrary to the facts presented
to the Planning Board. The Board of Appeals may only review the record of the proceedings
before the Planning Board. The Board Appeals shall not receive or consider any evidence
which was not presented to the Planning Board, but the Board of Appeals may receive and
consider written or oral arguments. If the Board of Appeals determines that the record of the
Planning Board proceedings are inadequate, the Board of Appeals may remand the matter to
the Planning Board for additional fact finding.
46
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by an
aggrieved party from any decision of the Code Enforcement Officer or the Planning
Board, except for enforcement-related matters as described in Section 16(H)(1)(a)
above. Such an appeal shall be taken within thirty (30) days of the date of the official,
written decision appealed from, and not otherwise, except that the Board, upon a
showing of good cause, may waive the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a written
notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the appeal
or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the Code
Enforcement Officer or Planning Board, as appropriate, shall transmit to the Board of
Appeals all of the papers constituting the record of the decision appealed from.
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal or a
request for a variance within thirty-five (35) days of its receipt of a complete written
application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a quorum
for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals within
thirty five (35) days after the close of the hearing, and shall issue a written
decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision, including a
statement of the facts found and conclusions reached by the Board. The Board
shall cause written notice of its decision to be mailed or hand-delivered to the
applicant and to the Department of Environmental Protection within seven (7) days
of the Board's decision. Copies of written decisions of the Board of Appeals shall
be given to the Planning Board, Code Enforcement Officer, and the municipal
officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F), any
aggrieved party who participated as a party during the proceedings before the Board of Appeals
47
may take an appeal to Superior Court in accordance with State laws within forty-five (45) days
from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of Appeals
may reconsider any decision within forty-five (45) days of its prior decision. A request to the
Board to reconsider a decision must be filed within ten (10) days of the decision that is being
reconsidered. A vote to reconsider and the action taken on that reconsideration must occur and
be completed within forty-five (45) days of the date of the vote on the original decision.
Reconsideration of a decision shall require a positive vote of the majority of the Board
members originally voting on the decision, and proper notification to the landowner, petitioner,
planning board, code enforcement officer, and other parties of interest, including abutters and
those who testified at the original hearing(s). The Board may conduct additional hearings and
receive additional evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15) days
after the decision on reconsideration.
I. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of this
Ordinance. If the Code Enforcement Officer shall find that any provision of this Ordinance
is being violated, he or she shall notify in writing the person responsible for such violation,
indicating the nature of the violation and ordering the action necessary to correct it,
including discontinuance of illegal use of land, buildings or structures, or work being done,
removal of illegal buildings or structures, and abatement of nuisance conditions. A copy of
such notices shall be submitted to the municipal officers and be maintained as a permanent
record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure compliance with
all applicable laws and conditions attached to permit approvals. The Code Enforcement
Officer shall also investigate all complaints of alleged violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential transactions of
the office, including applications submitted, permits granted or denied, variances granted
or denied, revocation actions, revocation of permits, appeals, court actions, violations
investigated, violations found, and fees collected.
(3) Legal Actions. When the above action does not result in the correction or abatement of the
violation or nuisance condition, the Municipal Officers, upon notice from the Code
Enforcement Officer, are hereby directed to institute any and all actions and proceedings,
either legal or equitable, including seeking injunctions of violations and the imposition of
fines, that may be appropriate or necessary to enforce the provisions of this Ordinance in the
name of the municipality. The municipal officers, or their authorized agent, are hereby
authorized to enter into administrative consent agreements for the purpose of eliminating
violations of this Ordinance and recovering fines without Court action. Such agreements shall
not allow an illegal structure or use to continue unless there is clear and convincing evidence
48
that the illegal structure or use was constructed or conducted as a direct result of erroneous
advice given by an authorized municipal official and there is no evidence that the owner acted
in bad faith, or unless the removal of the structure or use will result in a threat or hazard to
public health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be penalized in
accordance with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per violation for
each day that the violation continues. However, in a resource protection district the
maximum penalty is increased to $5000 (38 M.R.S.A. section 4452).
17. Definitions.
Accessory structure or use - a use or structure which is incidental and subordinate to the principal use
or structure. Accessory uses, when aggregated, shall not subordinate the principal use of the lot. A deck
or similar extension of the principal structure or a garage attached to the principal structure by a roof or
a common wall is considered part of the principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the granting or
denial of a permit or variance under this Ordinance; a person whose land abuts land for which a permit
or variance has been granted; or any other person or group of persons who have suffered particularized
injury as a result of the granting or denial of such permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or animals,
including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy
products; poultry and poultry products; livestock; fruits and vegetables; and ornamental and green-
house products. Agriculture does not include forest management and timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine plant or
animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and inclusive of
bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and having more
than 50% of its volume below the existing ground level.
Bureau of Forestry - State of Maine Department of Agriculture, Conservation, and Forestry.
Boat Launching Facility - a facility designed primarily for the launching and landing of watercraft,
and which may include an access ramp, docking area, and parking spaces for vehicles and trailers.
Bureau - State of Maine Department of Conservation's Bureau of Forestry
49
Campground - any area or tract of land to accommodate two (2) or more parties in temporary living
quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation," defined
below, the intent and result of which activity is the production of income from the buying and selling
of goods and/or services, exclusive of rental of residential buildings and/or dwelling units.
Cross-sectional area - the cross-sectional area of a stream or tributary stream channel is determined
by multiplying the stream or tributary stream channel width by the average stream or tributary stream
channel depth. The stream or tributary stream channel width is the straight line distance from the
normal high-water line on one side of the channel to the normal high-water line on the opposite side
of the channel. The average stream or tributary stream channel depth is the average of the vertical
distances from a straight line between the normal high-water lines of the stream or tributary stream
channel to the bottom of the channel.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
Dimensional requirements - numerical standards relating to spatial relationships including but not
limited to setback, lot area, shore frontage and height.
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or illness;
and also includes the physical or mental condition of a person which constitutes a substantial
handicap as determined by a physician or in the case of mental handicap, by a psychiatrist or
psychologist, as well as any other health or sensory impairment which requires special education,
vocational rehabilitation or related services.
Disruption of shoreline integrity - the alteration of the physical shape, properties, or condition of a
shoreline at any location by timber harvesting and related activities. A shoreline where shoreline
integrity has been disrupted is recognized by compacted, scarified and/or rutted soil, an abnormal
channel or shoreline cross-section, and in the case of flowing waters, a profile and character altered
from natural conditions.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two single-
family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general welfare, such
as protection of resources from immediate destruction or loss, law enforcement, and operations to
rescue human beings, property and livestock from the threat of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or water
transmission or distribution lines, towers and related equipment; telephone cables or lines, poles and
related equipment; gas, oil, water, slurry or other similar pipelines; municipal sewage lines,
collection or supply systems; and associated storage tanks. Such systems may include towers, poles,
wires, mains, drains, pipes, conduits, cables, fire alarms and police call boxes, traffic signals,
50
hydrants and similar accessories, but shall not include service drops or buildings which are necessary
for the furnishing of such services.
Expansion of a structure - an increase in the footprint of a structure, including all extensions such
as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the use of
more footprint of a structure or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be reserved
in order to discharge the 100-year flood without cumulatively increasing the water surface elevation
by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by exterior walls.
Footprint - the entire area of ground covered by the structure(s) on a lot, including but not limited to
cantilevered or similar overhanging extensions, as well as unenclosed structures, such as patios and
decks.
Forest management activities - timber cruising and other forest resource evaluation activities,
pesticide or fertilizer application, management planning activities, timber stand improvement,
pruning, regeneration of forest stands, and other similar or associated activities, exclusive of timber
harvesting and the construction, creation or maintenance of roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6) meters tall
(approximately twenty (20) feet) or taller.
Forest Stand - a contiguous group of trees sufficiently uniform in age class distribution,
composition, and structure, and growing on a site of sufficiently uniform quality, to be a
distinguishable unit.
Foundation - the supporting substructure of a building or other structure, excluding wooden sills and
post supports, but including basements, slabs, frostwalls, or other base consisting of concrete, block,
brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than forested
wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and adjacent to a
surface water body, excluding any river, stream or brook, such that in a natural state, the
combined surface area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a duration
sufficient to support, and which under normal circumstances do support, a prevalence of
wetland vegetation typically adapted for life in saturated soils.
51
Freshwater wetlands may contain small stream channels or inclusions of land that do not conform to
the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose, location on
submerged lands or that require direct access to, or location in, coastal or inland waters and that can
not be located away from these waters. The uses include, but are not limited to commercial and
recreational fishing and boating facilities, finfish and shellfish processing, fish-related storage and
retail and wholesale fish marketing facilities, waterfront dock and port facilities, shipyards and boat
building facilities, marinas, navigation aids, basins and channels, shoreline structures necessary for
erosion control purposes, industrial uses dependent upon water-borne transportation or requiring
large volumes of cooling or processing water that can not reasonably be located or operated at an
inland site, and uses that primarily provide general public access to coastal or inland waters.
Recreational boat storage buildings are not considered to be a functionally water-dependent use.
Great pond - any inland body of water which in a natural state has a surface area in excess of ten
acres, and any inland body of water artificially formed or increased which has a surface area in
excess of thirty (30) acres except for the purposes of this Ordinance, where the artificially formed or
increased inland body of water is completely surrounded by land held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article 4-A
Section 465-A. This classification includes some, but not all impoundments of rivers that are defined
as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed organic
matter of the forest floor.
Harvest Area - the area where timber harvesting and related activities, including the cutting of trees,
skidding, yarding, and associated road construction take place. The area affected by a harvest
encompasses the area within the outer boundaries of these activities, excepting unharvested areas
greater than 10 acres within the area affected by a harvest.
Hazard Tree - a tree with a structural defect, combination of defects, or disease resulting in a
structural defect that under the normal range of environmental conditions at the site exhibits a high
probability of failure and loss of a major structural component of the tree in a manner that will strike
a target. A normal range of environmental conditions does not include meteorological anomalies,
such as, but not limited to, hurricanes, hurricane-force winds, tornados, micorbursts, or significant
ice storm events.
Hazard trees also include those trees that pose a serious and imminent risk to bank stability. A target
is the area where personal injury or property damage could occur if the tree or a portion of the tree
fails. Targets include roads, driveways, parking areas, structures, campsites, and any other developed
area where people frequently gather and linger.
Height of a structure - the vertical distance between the mean original (prior to construction) grade
at the downhill side of the structure and the highest point of the structure, excluding chimneys,
steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
52
residential use of the property and surrounding residential uses; and 2) which employs no more than
two (2) persons other than family members residing in the home.
Increase in nonconformity of a structure - any change in a structure or property which causes
further deviation from the dimensional standard(s) creating the nonconformity such as, but not
limited to, reduction in water body, tributary stream or wetland setback distance, increase in lot
coverage, or increase in height of a structure. Property changes or structure expansions which either
meet the dimensional standard or which cause no further increase in the linear extent of
nonconformance of the existing structure shall not be considered to increase nonconformity. For
example, there is no increase in nonconformity with the setback requirement for water bodies,
wetlands, or tributary streams if the expansion extends no further into the required setback area than
does any portion of the existing nonconforming structure. Hence, a structure may be expanded
laterally provided that the expansion extends no closer to the water body, tributary stream, or wetland
than the closest portion of the existing structure from that water body, tributary stream, or wetland.
Included in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but which
is developed for repeated camping by only one group not to exceed ten (10) individuals and which
involves site improvements which may include but not be limited to a gravel pad, parking area, fire
place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing of
goods, or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public or
private school, hospital, or municipally owned or operated building, structure or land used for public
purposes.
Land Management Road - a route or track consisting of a bed of exposed mineral soil, gravel, or
other surfacing materials constructed for, or created by, the passage of motorized vehicles and used
primarily for timber harvesting and related activities, including associated log yards, but not
including skid trails or skid roads.
Licensed Forester - a forester licensed under 32 M.R.S.A. Chapter 76.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the normal
high-water line of a water body or upland edge of a wetland and areas beneath roads serving more
than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal use,
providing for hire offshore moorings or docking facilities for boats, and which may also provide
accessory services such as boat and related sales, boat repair and construction, indoor and outdoor
storage of boats and marine equipment, bait and tackle shops and marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under prevailing
market conditions in a sale between a willing seller and a willing buyer, both conversant with the
property and with prevailing general price levels.
53
Mineral exploration - hand sampling, test boring, or other methods of determining the nature or
extent of mineral resources which create minimal disturbance to the land and which include
reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more than
one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or other like
material from its natural location and to transport the product removed, away from the extraction site.
Minimum lot width - the closest distance between the side lot lines of a lot. When only two lot lines
extend into the shoreland zone, both lot lines shall be considered to be side lot lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling
units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely because it
was in lawful existence at the time this Ordinance or subsequent amendment took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or amendment of
this Ordinance, does not meet the area, frontage, or width requirements of the district in which it is
located.
Non-conforming structure - a structure which does not meet any one or more of the following
dimensional requirements; setback, height, lot coverage, or footprint but which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is not
allowed in the district in which it is situated, but which is allowed to remain solely because it was in
lawful existence at the time this Ordinance or subsequent amendments took effect.
Non-native invasive species of vegetation - species of vegetation listed by the Maine Department
of Agriculture, Conservation and Foresty as being invasive in Maine ecosystems and not native to
Maine ecosystems.
Normal high-water line (non-tidal waters) - that line which is apparent from visible markings,
changes in the character of soils due to prolonged action of the water or changes in vegetation, and
which distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-forested wetland vegetation and hydric soils
and that are at the same or lower elevation as the water level of the river or great pond during the
period of normal high-water are considered part of the river or great pond.
Outlet stream - any perennial or intermittent stream, as shown on the most recent highest resolution
version of the national hydrography dataset from the United States Geological Survey on the website
of the United States Geological Survey or the national map, that flows from a freshwater wetland.
Person - an individual, corporation, governmental agency, municipality, trust, estate, partnership,
association, two or more individuals having a joint or common interest, or other legal entity.
54
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the
normal high-water line or within a wetland.
Temporary:
Structures which remain in or over the water for less than seven (7) months in
any period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or more in any
period of twelve (12) consecutive months.
Principal structure - a structure other than one which is used for purposes wholly incidental or
accessory to the use of another structure or use on the same lot.
Principal use - a use other than one which is wholly incidental or accessory to another use on the
same lot.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas, and
roads, which are owned, leased, or otherwise operated, or funded by a governmental body or public
entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial
Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and designed for
temporary sleeping or living quarters for one or more persons, and which may include a pick-up
camper, travel trailer, tent trailer, camp trailer, and motor home. In order to be considered as a
vehicle and not as a structure, the unit must remain with its tires on the ground, and must be
registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the structure,
or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for use as
permanent, seasonal, or temporary living quarters for only one family at a time, and containing
cooking, sleeping and toilet facilities. The term shall include mobile homes and rental units that
contain cooking, sleeping, and toilet facilities regardless of the time-period rented. Recreational
vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees remaining on a harvested site.
55
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion control
and soil stabilization, typically used on ground slopes of two (2) units horizontal to one (1) unit
vertical or less.
Residual Stand - a stand of trees remaining in the forest following timber harvesting and related
activities
River - a free-flowing body of water including its associated floodplain wetlands from that point at
which it provides drainage for a watershed of twenty five (25) square miles to its mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other surfacing
material constructed for or created by the repeated passage of motorized vehicles, excluding a
driveway as defined.
Sapling - a tree species that is less than two (2) inches in diameter at four and one half (4.5) feet
above ground level.
Seedling - a young tree species that is less than four and one half (4.5) feet in height above ground
level.
Service drop - any utility line extension which does not cross or run beneath any portion of a water
body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon the
premises of the customer requesting service or upon a roadway right-of-way; and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone wires to
existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground is less
than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or tributary
stream, or upland edge of a wetland, to the nearest part of a structure, road, parking space or other
regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a straight line
between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal distance,
of the normal high-water line of any great pond or river; within 250 feet, horizontal distance, of the
upland edge of a coastal wetland, including all areas affected by tidal action; within 250 feet of the
56
upland edge of a freshwater wetland; or within seventy-five (75) feet, horizontal distance, of the
normal high-water line of a stream.
Shoreline - the normal high-water line, or upland edge of a freshwater or coastal wetland.
Significant River Segments - See Appendix B or 38 M.R.S.A. section 437.
Skid Road or Skid Trail - a route repeatedly used by forwarding machinery or animal to haul or
drag forest products from the stump to the yard or landing, the construction of which requires
minimal excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest.
Storm-damaged tree - a tree that has been uprooted, blown down, is lying on the ground, or that
remains standing and is damaged beyond the point of recovery as the result of a storm event.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of two (2)
perennial streams as depicted on the most recent, highest resolution version of the national
hydrography dataset available from the United States Geological Survey on the website of the United
States Geological Survey or the natonal map to the point where the stream becomes a river or where
the stream meets the shoreland zone of another water body or wetland. When a stream meets the
shoreland zone of a water body or wetland and a channel forms downstream of the water body or
wetland as an outlet, that channel is also a stream.
Structure - anything temporaily or permanently located, built, constructed or erected for the support,
shelter or enclosure of persons, animals, goods or property of any kind, or anything constructed or
erected on or in the ground. The term includes structures temporarily or permanently located, such
as decks, patios, and satellite dishes. Structure does not include fences, poles and wiring or other
aerial equipment normally associated with service drops, including guy wires and guy anchors,
subsurface waste water disposal systems as defined in Title 30-A section 4201, subsection 5,
geothermal heat exchange wells as defined in Title 32, section 4700-E. subsection 3-C or wells or
water wells as defined in Title 32, section 4700-E, subsection 8.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured as a
percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste water on or
beneath the surface of the earth; includes, but is not limited to: septic tanks; disposal fields;
grandfathered cesspools; holding tanks; pretreatment filter, piping, or any other fixture, mechanism,
or apparatus used for those purposes; does not include any discharge system licensed under 38
M.R.S.A. section 414, any surface waste water disposal system, or any municipal or quasi-municipal
sewer or waste water treatment system..
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Tidal waters - all waters affected by tidal action during the maximum spring tide.
57
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. "Timber harvesting" does not include the cutting or removal of
vegetation within the shoreland zone when associated with any other land use activities. The cutting
or removal of trees in the shoreland zone on a lot that has less than two (2) acres within the shoreland
zone shall not be considered timber harvesting. Such cutting or removal of trees shall be regulated
pursuant to Section 15 (P), Clearing or Removal of Vegetation for Activities Other Than Timber
Harvesting.
Timber harvesting and related activities - timber harvesting, the construction and maintenance of
roads used primarily for timber harvesting and other activities conducted to facilitate timber
harvesting.
Tree - a woody perennial plant with a well-defined trunk(s) at least two (2) inches in diameter at four
and one half (4.5) feet above the ground, with a more or less definite crown, and reaching a height of
at least ten (10) feet at maturity.
Tributary stream - means a channel between defined banks created by the action of surface water,
which is characterized by the lack of terrestrial vegetation or by the presence of a bed, devoid of
topsoil, containing waterborne deposits or exposed soil, parent material or bedrock; and which is
connected hydrologically with other water bodies. "Tributary stream" does not include rills or gullies
forming because of accelerated erosion in disturbed soils where the natural vegetation cover has been
removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance, and only
applies to that portion of the tributary stream located within the shoreland zone of the receiving water
body or wetland.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a coastal
wetland, this boundary is the line formed by the landward limits of the salt tolerant vegetation and/or
the maximum spring tide level, including all areas affected by tidal action. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a duration
sufficient to support wetland vegetation; or where the soils support the growth of wetland vegetation,
but such vegetation is dominated by woody stems that are six (6) meters (approximately twenty (20)
feet) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both over and
under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Velocity zone - an area of special flood hazard extending from offshore to the inland limit of the
primary frontal dune along an open coast and any other area subject to high velocity wave action
from storms or seismic sources.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed exterior
walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream.
Water crossing - any project extending from one bank to the opposite bank of a river, stream,
tributary stream, or wetland whether under, through, or over the water or wetland. Such projects
58
include but may not be limited to roads, fords, bridges, culverts, water lines, sewer lines, and cables
as well as maintenance work on these crossings. This definition includes crossings for timber
harvesting equipment and related activities.
Wetland - a freshwater or coastal wetland.
Windfirm - the ability of a forest stand to withstand strong winds and resist windthrow, wind
rocking, and major breakage.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
18. EFFECTIVE DATES:
STATUTORY AUTHORITY: 38 M.R.S.A. Section 438-A(5)
EFFECTIVE DATE:
December 31, 1991
AMENDED:
March 29, 1993
March 2004
March 2011
March 2017