This is the exact embedded text of the captured official document.
Snapshot 5a94091be962 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
CHAPTER 315
CHAPTER 315
FLOOD PLAIN MANAGEMENT ORDINANCE
Town of Yarmouth, Maine
Recodified 1/15/98
Amended 6/11/98
Repealed and Replaced: 5/15/08
Amended: 6/18/15
Repealed and Replaced: 4/25/24
Amended: 4/17/25
CHAPTER 315
FLOOD PLAIN MANAGEMENT ORDINANCE
Table of Contents
ARTICLE I ..................................................................................................................................... 1
PURPOSE AND ESTABLISHMENT .................................................................................... 1
ARTICLE II .................................................................................................................................... 1
PERMIT REQUIRED ............................................................................................................... 1
ARTICLE III ................................................................................................................................... 2
APPLICATION FOR PERMIT ................................................................................................ 2
ARTICLE IV .................................................................................................................................. 4
APPLICATION FEE AND EXPERT'S FEE ......................................................................... 4
ARTICLE V ................................................................................................................................... 4
REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS ....................................................................................................................... 4
ARTICLE VI .................................................................................................................................. 6
DEVELOPMENT STANDARDS ............................................................................................ 6
ARTICLE VII ............................................................................................................................... 15
CONDITIONAL USE REVIEW ............................................................................................ 15
ARTICLE VIII .............................................................................................................................. 16
CERTIFICATE OF COMPLIANCE ..................................................................................... 16
ARTICLE IX ................................................................................................................................ 17
REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS ............................. 17
ARTICLE X ................................................................................................................................. 18
APPEALS AND VARIANCES ............................................................................................. 18
ARTICLE XI ................................................................................................................................ 20
ENFORCEMENT AND PENALTIES .................................................................................. 20
ARTICLE XII ............................................................................................................................... 21
VALIDITY AND SEVERABILITY ........................................................................................ 21
ARTICLE XIII .............................................................................................................................. 21
CONFLICT WITH OTHER ORDINANCES ........................................................................ 21
ARTICLE XIV .............................................................................................................................. 21
DEFINITIONS ......................................................................................................................... 21
ARTICLE XV ............................................................................................................................... 28
ABROGATION ....................................................................................................................... 28
ARTICLE XV ............................................................................................................................... 28
LIMIT OF LIABILITY ............................................................................................................. 28
CHAPTER 315
1
FLOOD PLAIN MANAGEMENT ORDINANCE
ARTICLE I
PURPOSE AND ESTABLISHMENT
Certain areas of the Town of Yarmouth, Maine, are subject to periodic flooding, causing
serious damages to properties within these areas. Relief is available in the form of flood
insurance as authorized by the National Flood Insurance Act of 1968.
Therefore, the Town of Yarmouth has chosen to become a participating community in
the National Flood Insurance Program and agrees to comply with the requirements of
the National Flood Insurance Act of 1968 (P.L. 90-488, as amended) as delineated in
this Floodplain Management Ordinance.
It is the intent of the Town of Yarmouth to require the recognition and evaluation of flood
hazards in all official actions relating to land use in the floodplain areas having special
flood hazards.
The Town of Yarmouth has the legal authority to adopt land use and control measures
to reduce future flood losses pursuant to Title 30-A MRSA, Sections 3001-3007, 4352,
4401-4407, and Title 38 MRSA, Section 440.
The National Flood Insurance Program, established in the aforesaid Act, provides that
areas of the Town of Yarmouth, having a special flood hazard be identified by the
Federal Emergency Management Agency and that floodplain management measures
be applied in such flood hazard areas. This Ordinance establishes a Flood Hazard
Development Permit system and review procedure for development activities in the
designated flood hazard areas of the Town of Yarmouth.
The areas of special flood hazard, Zones A, AE, and VE for the Town of Yarmouth,
Cumberland County, Maine, identified by the Federal Emergency Management Agency
in a report entitled "Flood Insurance Study - Cumberland County, Maine" dated June
20, 2024, with accompanying "Flood Insurance Rate Map" dated June 20, 2024, as
amended, are hereby adopted by reference and declared to be a part of this Ordinance.
ARTICLE II
PERMIT REQUIRED
The Director of Planning & Development shall be designated as the local Floodplain
Administrator. The Floodplain Administrator shall have the authority to implement the
commitment made to administer and enforce the requirements for participation in the
National Flood Insurance Program.
Before any construction or other development (as defined in Article XIV), including the
placement of manufactured homes, begins within any areas of special flood hazard
established in Article I, a Flood Hazard Development Permit shall be obtained from the
CHAPTER 315
2
Director of Planning & Development, their duly authorized Code Enforcement Officer, or
other designee, except as provided in Article VII. This permit shall be in addition to any
other permits which may be required pursuant to the codes and ordinances of the Town
of Yarmouth.
ARTICLE III
APPLICATION FOR PERMIT
The application for a Flood Hazard Development Permit shall be submitted in writing to
the Department of Planning and Development and shall include:
A. The name, address, and phone number of the applicant, owner, and contractor;
B. An address and a map indicating the location of the construction site;
C. A site plan showing locations of existing and/or proposed development, including
but not limited to structures, sewage disposal facilities, water supply facilities,
areas to be cut and filled, and lot dimensions;
D. A statement of the intended use of the structure and/or development;
E. A statement of the cost of the development including all materials and labor;
F. A statement as to the type of sewage system proposed;
G. Specification of dimensions of the proposed structure and/or development;
[Items H-K.3. apply only to new construction and substantial improvements.]
H. The elevation in relation to the National Geodetic Vertical Datum (NGVD), North
American Vertical Datum (NAVD), or to a locally established datum in Zone A
only, of the:
1. base flood at the proposed site of all new or substantially improved structures,
which is determined:
a. in Zones AE, and VE from data contained in the "Flood Insurance Study -
Cumberland County, Maine," as described in Article I; or,
b. in Zone A:
(1) from any base flood elevation data from federal, state, or other technical
sources (such as FEMA's Quick-2 model, FEMA 265), including
information obtained pursuant to Article VI.M. and IX.D.; or,
CHAPTER 315
3
(2) in the absence of all data described in Article III.H.1.b.(1), information to
demonstrate that the structure shall meet the elevation requirement in
Article VI.H.2.b., Article VI.I.2.b., or Article VI.J.2.b.
2. highest and lowest grades at the site adjacent to the walls of the proposed
building;
3. lowest floor, including basement; and whether or not such structures contain
a basement;
4. lowest machinery and equipment servicing the building; and,
5. level, in the case of non-residential structures only, to which the structure will
be floodproofed.
I. A description of an elevation reference point established on the site of all
developments for which elevation standards apply as required in Article VI;
J. A written certification by:
1. a Professional Land Surveyor that the grade elevations shown on the
application are accurate; and,
2. a Professional Land Surveyor, registered professional engineer or architect
that the base flood elevation shown on the application is accurate.
K. The following certifications as required in Article VI by a registered professional
engineer or architect:
1. a Floodproofing Certificate (FEMA Form FF-206-FY-22-153, as amended), to
verify that the floodproofing methods for any non-residential structures will
meet the floodproofing criteria of Article VI.I., and other applicable standards
in Article VI;
2. a V-Zone Certificate to verify that the construction in coastal high hazard
areas, Zone VE and Coastal AE Zone, will meet the criteria of Article VI.R.;
and other applicable standards in Article VI;
3. a Hydraulic Openings Certificate to verify that engineered hydraulic openings
in foundation walls will meet the standards of Article VI.N.2.a.;
4. a certified statement that bridges will meet the standards of Article VI.O.;
5. a certified statement that containment walls will meet the standards of Article
VI.P.
CHAPTER 315
4
L. A description of the extent to which any water course will be altered or relocated
as a result of the proposed development; and,
M. A statement of construction plans describing in detail how each applicable
development standard in Article VI will be met.
ARTICLE IV
APPLICATION FEE AND EXPERT'S FEE
A non-refundable application fee of $50.00 shall be paid to the Department of Planning
& Development and a copy of a receipt for the same shall accompany the application.
An additional fee may be charged if the Code Enforcement Officer, Planning Board,
and/or General Board of Appeals requires the assistance of a professional engineer or
other expert. The expert's fee shall be paid in full by the applicant within 10 days after
the town submits a bill to the applicant. Failure to pay the bill shall constitute a violation
of the ordinance and be grounds for the issuance of a stop work order. An expert shall
not be hired by the municipality at the expense of an applicant until the applicant has
either consented to such hiring in writing or been given an opportunity to be heard on
the subject. An applicant who is dissatisfied with a decision to hire expert assistance
may appeal that decision to the General Board of Appeals.
ARTICLE V
REVIEW STANDARDS FOR FLOOD HAZARD DEVELOPMENT PERMIT
APPLICATIONS
The Director of Planning & Development shall:
A. Review all applications for the Flood Hazard Development Permit to assure that
proposed developments are reasonably safe from flooding and to determine that
all pertinent requirements of Article VI (Development Standards) have been, or
will be met;
B. Utilize, in the review of all Flood Hazard Development Permit applications:
1. the base flood and floodway data contained in the "Flood Insurance Study -
Cumberland County, Maine," as described in Article I;
2. in special flood hazard areas where base flood elevation and floodway data
are not provided, the Director of Planning & Development shall obtain, review,
and reasonably utilize any base flood elevation and floodway data from
federal, state, or other technical sources, including information obtained
pursuant to Article III.H.1.b.(1); Article VI.M.; and Article IX.D., in order to
administer Article VI of this Ordinance; and,
CHAPTER 315
5
3. when the community establishes a base flood elevation in a Zone A by
methods outlined in Article III.H.1.b.(1), the community shall submit that data
to the Maine Floodplain Management Program.
C. Make interpretations of the location of boundaries of special flood hazard areas
shown on the maps described in Article I of this Ordinance;
D. In the review of Flood Hazard Development Permit applications, determine that
all necessary permits have been obtained from those federal, state, and local
government agencies from which prior approval is required by federal or state
law, including but not limited to Section 404 of the Federal Water Pollution
Control Act Amendments of 1972, 33 U.S.C. 1344;
E. Notify adjacent municipalities, the Department of Environmental Protection, and
the Maine Floodplain Management Program prior to any alteration or relocation
of a water course and submit copies of such notifications to the Federal
Emergency Management Agency;
F. If the application satisfies the requirements of this Ordinance, approve the
issuance of one of the following Flood Hazard Development Permits, based on
the type of development. However, for development that requires review and
approval as a Conditional Use, as provided for in this Ordinance, the Flood
Hazard Development Permit shall be acted upon by the Planning Board as
required in Article VII.
1. A two-part Flood Hazard Development Permit for elevated structures. Part I
shall authorize the applicant to build a structure to and including the first
horizontal floor only above the base flood level. At that time the applicant shall
provide the Code Enforcement Officer with an "under construction" Elevation
Certificate completed by a Professional Land Surveyor based on the Part I
permit construction for verifying compliance with the elevation requirements of
Article VI, paragraphs H., I., J., or R. Following review of the Elevation
Certificate data, which shall take place within 72 hours of receipt of the
application, the Code Enforcement Officer shall issue Part II of the Flood
Hazard Development Permit. Part II shall authorize the applicant to complete
the construction project; or,
2. A Flood Hazard Development Permit for Floodproofing of Non-Residential
Structures that are new construction or substantially improved non-residential
structures that are not being elevated but that meet the floodproofing
standards of Article VI.I.1. The application for this permit shall include a
Floodproofing Certificate signed by a registered professional engineer or
architect; or,
3. A Flood Hazard Development Permit for Minor Development for all
development that is not new construction or a substantial improvement, such
CHAPTER 315
6
as repairs, maintenance, renovations, or additions, whose value is less than
50% of the market value of the structure. Minor development also includes
but is not limited to: accessory structures as provided for in Article VI.L.,
mining, dredging, filling, grading, paving, excavation, drilling operations,
storage of equipment or materials, deposition or extraction of materials, public
or private sewage disposal systems or water supply facilities that do not
involve structures; and non-structural projects such as bridges, dams, towers,
fencing, pipelines, wharves, and piers.
G. Maintain, as a permanent record, copies of all Flood Hazard Development Permit
Applications, corresponding Permits issued, and data relevant thereto, including
reports of the General Board of Appeals on variances granted under the
provisions of Article X of this Ordinance, and copies of Elevation Certificates,
Floodproofing Certificates, Certificates of Compliance, and certifications of
design standards required under the provisions of Articles III, VI, and VIII of this
Ordinance.
ARTICLE VI
DEVELOPMENT STANDARDS
All developments in areas of special flood hazard shall meet the following applicable
standards:
A. All Development - All development shall:
1. be designed or modified and adequately anchored to prevent flotation
(excluding piers and docks), collapse, or lateral movement of the
development resulting from hydrodynamic and hydrostatic loads, including the
effects of buoyancy;
2. use construction materials that are resistant to flood damage;
3. use construction methods and practices that will minimize flood damage; and,
4. use electrical, heating, ventilation, plumbing, and air conditioning equipment,
and other service facilities that are designed and/or located to prevent water
from entering or accumulating within the components during flooding
conditions.
B. Water Supply - All new and replacement water supply systems shall be designed
to minimize or eliminate infiltration of flood waters into the systems.
C. Sanitary Sewage Systems - All new and replacement sanitary sewage systems
shall be designed and located to minimize or eliminate infiltration of flood waters
into the system and discharges from the system into flood waters.
CHAPTER 315
7
D. On Site Waste Disposal Systems - On site waste disposal systems shall be
located and constructed to avoid impairment to them or contamination from them
during floods.
E. Watercourse Carrying Capacity - All development associated with altered or
relocated portions of a watercourse shall be constructed and maintained in such
a manner that no reduction occurs in the flood carrying capacity of the
watercourse.
F. Utilities - New construction or substantial improvement of any structure (including
manufactured homes) located within:
1. Zones A and AE shall have the bottom of all electrical, heating, plumbing,
ventilation and air conditioning equipment, permanent fixtures and
components, HVAC ductwork and duct systems, and any other utility service
equipment, facilities, machinery, or connections servicing a structure,
elevated to at least one foot above the base flood elevation.
2. Zone VE shall meet the requirements of Article VI.R.2.
G. Physical Changes to the Natural Landscape - Certain development projects,
including but not limited to, retaining walls, sea walls, levees, berms, and rip rap,
can cause physical changes that affect flooding conditions.
1. All development projects in Zones AE and VE (as defined) that cause
physical changes to the natural landscape shall be reviewed by a Qualified
Professional to determine whether or not the project changes the base flood
elevation, zone, and/or the flood hazard boundary line.
a. If the Qualified Professional determines, through the use of standard
practices, that the project would not necessitate a Letter of Map Revision
(LOMR), a certified statement shall be provided.
b. If the Qualified Professional determines that the project may cause a
change, a hydrologic and hydraulic analysis that meets current FEMA
standards shall be performed.
2. If the hydrologic and hydraulic analysis performed indicates a change to the
base flood elevation, zone, and/or the flood hazard boundary line, the
applicant may submit a Conditional Letter of Map Revision (C-LOMR) request
to the Federal Emergency Management Agency for assurance that the as-
built project will result in a change to the Flood Insurance Rate Map. Once the
development is completed, a request for a Letter of Map Revision (LOMR)
shall be initiated; or,
CHAPTER 315
8
3. If the hydrologic and hydraulic analysis performed show a change to the base
flood elevation, zone, and/or the flood hazard boundary line, as soon as
practicable, but no later than 6 months after the completion of the project, the
applicant shall submit the technical data to FEMA in the form of a Letter of
Map Revision request.
H. Residential - New construction or substantial improvement of any residential
structure located within:
1. Zone AE shall have the lowest floor (including basement) elevated to at least
one foot above the base flood elevation.
2. Zone A shall have the lowest floor (including basement) elevated:
a. to at least one foot above the base flood elevation utilizing information
obtained pursuant to Article III.H.1.b.(1); Article V.B.; or Article IX.D., or;
b. in the absence of all data described in Article VI.H.2.a., to at least two feet
above the highest adjacent grade to the structure.
3. Zone VE and Coastal AE Zone (as defined) shall meet the requirements of
Article VI.R.
I. Non-Residential - New construction or substantial improvement of any non-
residential structure located within:
1. Zone AE shall have the lowest floor (including basement) elevated to at least
one foot above the base flood elevation, or together with attendant utility and
sanitary facilities shall:
a. be floodproofed to at least one foot above the base flood elevation so that
below that elevation the structure is watertight with walls substantially
impermeable to the passage of water;
b. have structural components capable of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy; and,
c. be certified by a registered professional engineer or architect that the
floodproofing design and methods of construction are in accordance with
accepted standards of practice for meeting the provisions of this section.
Such certification shall be provided with the application for a Flood Hazard
Development Permit, as required by Article III.K., and shall include a
record of the elevation above mean sea level to which the structure is
floodproofed.
2. Zone A shall have the lowest floor (including basement) elevated:
CHAPTER 315
9
a. to at least one foot above the base flood elevation utilizing information
obtained pursuant to Article III.H.1.b.(1); Article V.B.; or Article IX.D., or;
b. in the absence of all data described in Article VI.I.2.a., to at least two feet
above the highest adjacent grade to the structure; or,
c. together with attendant utility and sanitary facilities, be floodproofed to one
foot above the elevation established in Article VI.I.2.a. or b. and meet the
floodproofing standards of Article VI.I.1.a., b., and c.
3. Zone VE and Coastal AE Zone (as defined) shall meet the requirements of
Article VI.R.
J. Manufactured Homes - New or substantially improved manufactured homes
located within:
1. Zone AE shall:
a. be elevated such that the lowest floor (including basement) of the
manufactured home is at least one foot above the base flood elevation;
b. be on a permanent foundation, which may be poured masonry slab or
foundation walls, with hydraulic openings, or may be reinforced piers or
block supports, any of which support the manufactured home so that no
weight is supported by its wheels and axles; and,
c. securely anchored to an adequately anchored foundation system to resist
flotation, collapse, or lateral movement. Methods of anchoring may
include, but are not limited to:
(1) over-the-top ties anchored to the ground at the four corners of the
manufactured home, plus two additional ties per side at intermediate
points (manufactured homes less than 50 feet long require one
additional tie per side); or by,
(2) frame ties at each corner of the home, plus five additional ties along
each side at intermediate points (manufactured homes less than 50 feet
long require four additional ties per side).
(3) All components of the anchoring system described in Article VI.J.1.c.(1)
& (2) shall be capable of carrying a force of 4800 pounds.
2. Zone A shall:
CHAPTER 315
10
a. be elevated on a permanent foundation, as described in Article VI.J.1.b.,
such that the lowest floor (including basement) of the manufactured home
is at least one foot above the base flood elevation utilizing information
obtained pursuant to Article III.H.1.b.(1); Article V.B.; or Article IX.D.; or,
b. in the absence of all data described in Article VI.J.2.a., to at least two feet
above the highest adjacent grade to the structure; and,
c. meet the anchoring requirements of VI.J.1.c.
3. Zone VE and Coastal AE Zone (as defined) shall meet the requirements of
Article VI.R.
K. Recreational Vehicles - Recreational Vehicles located within:
1. Zones A and AE shall either:
a. be on the site for fewer than 180 consecutive days; and,
b. be fully licensed and ready for highway use. A recreational vehicle is
ready for highway use if it is on its wheels or jacking system, is attached to
the site only by quick disconnect type utilities and security devices, and
has no permanently attached additions; or,
c. be permitted in accordance with the elevation and anchoring requirements
for "manufactured homes" in Article VI.J.1.
2. Zone VE and Coastal AE Zone (as defined) shall meet the requirements of
either Article VI.K.1.a. and b., or Article VI.R.
L. Accessory Structures - New construction or substantial improvement of
Accessory Structures, as defined in Article XIV, shall be exempt from the
elevation criteria required in Article VI.H. & I. above, if all other requirements of
Article VI and all the following requirements are met.
1. Accessory Structures located in Zones A and AE shall:
a. meet the requirements of Article VI.A.1. through 4., as applicable;
b. be limited in size to a one-story two car garage;
c. have unfinished interiors and not be used for human habitation;
d. have only ground fault interrupt electrical outlets. The electric service
disconnect shall be located above the base flood elevation and, when
possible, outside the Special Flood Hazard Area;
CHAPTER 315
11
e. be located outside the floodway;
f. when possible be constructed and placed on the building site so as to
offer the minimum resistance to the flow of floodwaters and be placed
further from the source of flooding than is the primary structure;
g. have hydraulic openings, as specified in Article VI.N.2., in at least two
different walls of the accessory structure; and
h. be located outside the Coastal AE Zone.
2. Accessory Structures in Zone VE and Coastal A Zones shall meet the
requirements of Article VI.R.
M. Floodways -
1. In Zone AE riverine areas, encroachments, including fill, new construction,
substantial improvement, and other development shall not be permitted within
a regulatory floodway which is designated on the community's Flood
Insurance Rate Map unless a technical evaluation certified by a registered
professional engineer is provided demonstrating that such encroachments will
not result in any increase in flood levels within the community during the
occurrence of the base flood discharge.
2. In Zones A and AE riverine areas, for which no regulatory floodway is
designated, encroachments, including fill, new construction, substantial
improvement, and other development shall not be permitted in the floodway
as determined in Article VI.M.3. unless a technical evaluation certified by a
registered professional engineer is provided demonstrating that the
cumulative effect of the proposed development, when combined with all other
existing development and anticipated development:
a. will not increase the water surface elevation of the base flood more than
one foot at any point within the community; and,
b. is consistent with the technical criteria contained in FEMA's guidelines and
standards for flood risk analysis and mapping.
3. In Zones A and AE riverine areas, for which no regulatory floodway is
designated, the regulatory floodway is determined to be the channel of the
river or other water course and the adjacent land areas to a distance of one-
half the width of the floodplain as measured from the normal high water mark
to the upland limit of the floodplain.
CHAPTER 315
12
N. Hydraulic Openings/Flood Vents - New construction or substantial improvement
of any structure in Zones A and AE that meets the development standards of
Article VI, including the elevation requirements of Article VI, paragraphs H., I., or
J. and is elevated on posts, columns, piers, piles, or crawl spaces may be
enclosed below the base flood elevation requirements provided all the following
criteria are met or exceeded:
1. Enclosed areas are not "basements" as defined in Article XIV;
2. Enclosed areas shall be designed to automatically equalize hydrostatic flood
forces on exterior walls by allowing for the entry and exit of flood water.
Designs for meeting this requirement must either:
a. be engineered and certified by a registered professional engineer or
architect; or,
b. meet or exceed the following minimum criteria:
(1) a minimum of two openings having a total net area of not less than one
square inch for every square foot of the enclosed area;
(2) the bottom of all openings shall be below the base flood elevation and
no higher than one foot above the lowest grade; and,
(3) openings may be equipped with screens, louvers, valves, or other
coverings or devices provided that they permit the entry and exit of
flood waters automatically without any external influence or control such
as human intervention, including the use of electrical and other non-
automatic mechanical means;
3. The enclosed area shall not be used for human habitation; and,
4. The enclosed areas are usable solely for building access, parking of vehicles,
or storage.
O. Bridges - New construction or substantial improvement of any bridge in Zones A,
AE, and VE shall be designed such that:
1. when possible, the lowest horizontal member (excluding the pilings or
columns) is elevated to at least one foot above the base flood elevation; and,
2. a registered professional engineer shall certify that:
a. the structural design and methods of construction shall meet the elevation
requirements of this section and the floodway standards of Article VI.M.;
and,
CHAPTER 315
13
b. the foundation and superstructure attached thereto are designed to resist
flotation, collapse, and lateral movement due to the effects of wind and
water loads acting simultaneously on all structural components. Water
loading values used shall be those associated with the base flood.
P. Containment Walls - New construction or substantial improvement of any
containment wall located within:
1. Zones A, AE, and VE shall:
a. have the containment wall elevated to at least one foot above the base
flood elevation;
b. have structural components capable of resisting hydrostatic and
hydrodynamic loads and the effects of buoyancy; and,
c. be certified by a registered professional engineer or architect that the
design and methods of construction are in accordance with accepted
standards of practice for meeting the provisions of this section. Such
certification shall be provided with the application for a Flood Hazard
Development Permit, as required by Article III.K.
Q. Wharves, Piers, and Docks - New construction or substantial improvement of
wharves, piers, and docks are permitted in and over water and seaward of the
mean high tide if the following requirements are met:
1. in Zones A, AE, and Coastal AE (as defined), permanent wharves, piers, and
docks shall comply with all applicable local, state, and federal regulations;
must be reasonably safe from flooding; and not increase flood risk; or,
2. in Zone VE, permanent wharves, piers, and docks shall have a Qualified
Professional develop or review the structural design and specifications; must
be designed to be reasonably safe from flooding; and not increase flood risk..
R. Coastal Floodplains -
1. New construction located within Zones AE and VE shall be located landward
of the reach of mean high tide except as provided in Article VI.R.7.
2. New construction or substantial improvement of any structure located within
Zone VE or Coastal AE Zone shall have the bottom of all electrical, heating,
plumbing, ventilation and air conditioning equipment, permanent fixtures and
components, HVAC ductwork and duct systems, and any other utility service
equipment, facilities, machinery, or connections servicing a structure,
elevated to at least one foot above the base flood elevation. Systems,
CHAPTER 315
14
fixtures, equipment, and components shall not be mounted on or penetrate
through walls intended to break away under flood loads.
3. New construction or substantial improvement of any structure located within
Zone VE and Coastal AE Zones (as defined) shall:
a. be elevated on posts or columns such that:
(1) the bottom of the lowest horizontal structural member of the lowest floor
(excluding the pilings or columns) is elevated to at least one foot above
the base flood elevation;
(2) the pile or column foundation and the elevated portion of the structure
attached thereto is anchored to resist flotation, collapse, and lateral
movement due to the effects of wind and water loads acting
simultaneously on all building components; and,
(3) water loading values used shall be those associated with the base
flood. Wind loading values used shall be those required by applicable
state and local building standards.
b. have the space below the lowest floor:
(1) free of obstructions; or,
(2) constructed with open wood lattice-work, or insect screening intended
to collapse under wind and water without causing collapse,
displacement, or other structural damage to the elevated portion of the
building or supporting piles or columns; or,
(3) constructed with non-supporting breakaway walls that have a design
safe loading resistance of not less than 10 or more than 20 pounds per
square foot.
c. require a registered professional engineer or architect to:
(1) develop or review the structural design, specifications, and plans for the
construction, which must meet or exceed the technical criteria
contained in the Coastal Construction Manual, (FEMA-55); and,
(2) certify that the design and methods of construction to be used are in
accordance with accepted standards of practice for meeting the criteria
of Article VI.R.3.
4. The use of fill for structural support in Zone VE and Coastal AE Zones is
prohibited.
CHAPTER 315
15
5. Human alteration of sand dunes within Zone VE and Coastal AE Zones is
prohibited unless it can be demonstrated that such alterations will not
increase potential flood damage.
6. The area below the lowest floor shall be used solely for parking vehicles,
building access, and storage.
7. Physical changes to the natural landscape in Zone VE are subject to the
requirements in Article VI.G.
8. Wharves, piers, and docks in Zone VE are subject to the requirements in
Article VI.Q.
9. Conditional Use - Lobster sheds and fishing sheds may be located seaward
of mean high tide and shall be exempt from the elevation requirement in
Article VI.I. only if permitted as a Conditional Use following review and
approval by the Planning Board, as provided in Article VII, and if all the
following requirements and those of Article VI.A., VI.M., and VI.N. are met:
a. The conditional use shall be limited to low value structures such as metal
or wood sheds 200 square feet or less and shall not exceed more than
one story.
b. The structure shall be securely anchored to the wharf or pier to resist
flotation, collapse, and lateral movement due to the effect of wind and
water loads acting simultaneously on all building components.
c. The structure will not adversely increase wave or debris impact forces
affecting nearby buildings.
d. The structure shall have unfinished interiors and shall not be used for
human habitation.
e. Any mechanical, utility equipment, and fuel storage tanks must be
anchored and either elevated or floodproofed to at least one foot above
the base flood elevation.
f. All electrical outlets shall be ground fault interrupt type. The electrical
service disconnect shall be located on shore above the base flood
elevation and, when possible, outside the Special Flood Hazard Area.
ARTICLE VII
CONDITIONAL USE REVIEW
CHAPTER 315
16
The Planning Board shall hear and decide upon applications for conditional uses
provided for in this Ordinance. The Planning Board shall hear and approve, approve
with conditions, or disapprove all applications for conditional uses. An applicant
informed by the Director of Planning & Development that a Conditional Use Permit is
required shall file an application for the permit with the Planning Board.
A. Review Procedure for a Conditional Use Flood Hazard Development Permit
1. The Flood Hazard Development Permit Application with additional information
attached addressing how each of the conditional use criteria specified in the
Ordinance will be satisfied may serve as the permit application for the
Conditional Use Permit.
2. Before deciding any application, the Planning Board shall hold a public
hearing on the application within 30 days of their receipt of the application.
3. If the Planning Board finds that the application satisfies all relevant
requirements of the ordinance, the Planning Board must approve the
application or approve with conditions within 45 days of the date of the public
hearing.
4. A Conditional Use Permit issued under the provisions of this Ordinance shall
expire if the work or change involved is not commenced within 180 days of
the issuance of the permit by the Planning Board.
5. The applicant shall be notified by the Planning Board in writing over the
signature of the Chair of the Planning Board that flood insurance is not
available for structures located entirely over water or seaward of mean high
tide.
B. Expansion of Conditional Uses
1. No existing building or use of premises may be expanded or enlarged without
a permit issued under this section if that building or use was established or
constructed under a previously issued Conditional Use Permit or if it is a
building or use which would require a Conditional Use Permit if being newly-
established or constructed under this Ordinance.
ARTICLE VIII
CERTIFICATE OF COMPLIANCE
No land in a special flood hazard area shall be occupied or used and no structure which
is constructed or substantially improved shall be occupied until a Certificate of
Compliance is issued by the Director of Planning & Development subject to the
following provisions:
CHAPTER 315
17
A. For New Construction or Substantial Improvement of any elevated structure the
applicant shall submit to the Director of Planning & Development:
1. an Elevation Certificate completed by a Professional Land Surveyor for
compliance with Article VI, paragraphs H., I., J., or R.; and,
2. for structures in Zone VE and Coastal AE Zone (as defined), certification by a
registered professional engineer or architect that the design and methods of
construction used are in compliance with Article VI.R.3.
B. The applicant shall submit written notification to the Director of Planning &
Development that the development is complete and complies with the provisions
of this ordinance.
C. Within 10 working days, the Director of Planning & Development shall:
1. review the required certificate(s) and the applicant's written notification; and,
2. upon determination that the development conforms to the provisions of this
ordinance, shall issue a Certificate of Compliance.
ARTICLE IX
REVIEW OF SUBDIVISION AND DEVELOPMENT PROPOSALS
The Planning Board shall, when reviewing subdivisions and other proposed developments
that require review under other federal law, state law, local ordinances or regulations, and
all projects on 5 or more disturbed acres, or in the case of manufactured home parks
divided into two or more lots, assure that:
A. All such proposals are consistent with the need to minimize flood damage.
B. All public utilities and facilities, such as sewer, gas, electrical, and water systems are
located and constructed to minimize or eliminate flood damages.
C. Adequate drainage is provided so as to reduce exposure to flood hazards.
D. All proposals include base flood elevations, flood boundaries, and, in a riverine
floodplain, floodway data. These determinations shall be based on engineering
practices recognized by the Federal Emergency Management Agency.
E. Any proposed development plan must include a condition of plan approval requiring
that structures on any lot in the development having any portion of its land within a
Special Flood Hazard Area are to be constructed in accordance with Article VI of this
ordinance. Such requirement will be included in any deed, lease, purchase and sale
agreement, or document transferring or expressing an intent to transfer any interest
in real estate or structure, including but not limited to a time-share interest. The
CHAPTER 315
18
condition shall clearly articulate that the municipality may enforce any violation of the
construction requirement and that fact shall also be included in the deed or any
other document previously described. The construction requirement shall also be
clearly stated on any map, plat, or plan to be signed by the Planning Board or local
reviewing authority as part of the approval process.
ARTICLE X
APPEALS AND VARIANCES
The General Board of Appeals may, upon written application of an aggrieved party, hear
and decide appeals where it is alleged that there is an error in any order, requirement,
decision, or determination made by, or failure to act by, the Director of Planning &
Development, Code Enforcement Officer, or Planning Board in the administration or
enforcement of the provisions of this Ordinance.
The General Board of Appeals may grant a variance from the requirements of this
Ordinance consistent with state law and the following criteria:
A. Variances shall not be granted within any designated regulatory floodway if any
increase in flood levels during the base flood discharge would result.
B. Variances shall be granted only upon:
1. a showing of good and sufficient cause; and,
2. a determination that should a flood comparable to the base flood occur, the
granting of a variance will not result in increased flood heights, additional
threats to public safety, public expense, or create nuisances, cause fraud or
victimization of the public, or conflict with existing local laws or ordinances;
and,
3. a showing that the issuance of the variance will not conflict with other state,
federal, or local laws or ordinances; and,
4. a determination that failure to grant the variance would result in "undue
hardship," which in this sub-section means:
a. that the land in question cannot yield a reasonable return unless a
variance is granted; and,
b. that the need for a variance is due to the unique circumstances of the
property and not to the general conditions in the neighborhood; and,
c. that the granting of a variance will not alter the essential character of the
locality; and,
CHAPTER 315
19
d. that the hardship is not the result of action taken by the applicant or a prior
owner.
C. Variances shall only be issued upon a determination that the variance is the
minimum necessary, considering the flood hazard, to afford relief, and the
General Board of Appeals may impose such conditions to a variance as is
deemed necessary.
D. Variances may be issued for new construction, substantial improvements, or
other development for the conduct of a functionally dependent use provided that:
1. the criteria of Article X.A. through C. and Article VI.M. are met; and,
2. the structure or other development is protected by methods that minimize
flood damages during the base flood and create no additional threats to public
safety.
E. Variances may be issued for the repair, reconstruction, rehabilitation, or
restoration of Historic Structures upon the determination that:
1. the development meets the criteria of Article X.A. through C.; and,
2. the proposed repair, reconstruction, rehabilitation, or restoration will not
preclude the structure's continued designation as a Historic Structure and the
variance is the minimum necessary to preserve the historic character and
design of the structure.
F. Variances may be issued for new construction and substantial improvement of
Agricultural Structures being used for the conduct of agricultural uses provided
that:
1. the development meets the criteria of Article X.A. through C.; and,
2. the development meets the criteria of Article VI.M. and Article VI.N.
G. Any applicant who meets the criteria of Article X.A. through C. and Article X.D.,
E., or F. shall be notified by the General Board of Appeals in writing over the
signature of the Chair of the General Board of Appeals that:
1. the issuance of a variance to construct a structure below the base flood level
will result in greatly increased premium rates for flood insurance up to
amounts as high as $25 per $100 of insurance coverage; and,
2. such construction below the base flood level increases risks to life and
property; and,
CHAPTER 315
20
3. the applicant agrees in writing that the applicant is fully aware of all the risks
inherent in the use of land subject to flooding, assumes those risks, and
agrees to indemnify and defend the municipality against any claims filed
against it that are related to the applicant's decision to use land located in a
floodplain and that the applicant individually releases the municipality from
any claims the applicant may have against the municipality that are related to
the use of land located in a floodplain.
H. Appeal Procedure for Administrative and Variance Appeals
1. An administrative or variance appeal may be taken to the General Board of
Appeals by an aggrieved party within thirty days after receipt of a written
decision of the Code Enforcement Officer or Planning Board.
2. Upon being notified of an appeal, the Code Enforcement Officer or Planning
Board, as appropriate, shall transmit to the General Board of Appeals all of
the documents constituting the record of the decision appealed from.
3. The General Board of Appeals shall hold a public hearing on the appeal
within thirty-five days of its receipt of an appeal request.
4. The person filing the appeal shall have the burden of proof.
5. The General Board of Appeals shall decide all appeals within thirty-five days
after the close of the hearing and shall issue a written decision on all appeals.
6. The General Board of Appeals shall submit to the Director of Planning &
Development a report of all variance actions, including justification for the
granting of the variance and an authorization for the Director of Planning &
Development to issue a Flood Hazard Development Permit, which includes
any conditions to be attached to said permit.
7. Any aggrieved party who participated as a party during the proceedings
before the General Board of Appeals may take an appeal to Superior Court in
accordance with State laws within forty-five days from the date of any
decision of the General Board of Appeals.
ARTICLE XI
ENFORCEMENT AND PENALTIES
A. It shall be the duty of the Code Enforcement Officer to enforce the provisions of
this Ordinance pursuant to Title 30-A MRSA § 4452.
B. The penalties contained in Title 30-A MRSA § 4452 shall apply to any violation of
this Ordinance.
CHAPTER 315
21
C. In addition to any other actions, Director of Planning and Development of his/her
duly authorized CEO upon determination that a violation exists, shall submit a
declaration to the Administrator of the Federal Insurance Administration
requesting a flood insurance denial. The valid declaration shall consist of;
1. the name of the property owner and address or legal description of the
property sufficient to confirm its identity or location;
2. a clear and unequivocal declaration that the property is in violation of a cited
State or local law, regulation, or ordinance;
3. a clear statement that the public body making the declaration has authority to
do so and a citation to that authority;
4. evidence that the property owner has been provided notice of the violation
and the prospective denial of insurance; and,
5. a clear statement that the declaration is being submitted pursuant to Section
1316 of the National Flood Insurance Act of 1968, as amended.
ARTICLE XII
VALIDITY AND SEVERABILITY
If any section or provision of this Ordinance is declared by the courts to be invalid, such
decision shall not invalidate any other section or provision of this Ordinance.
ARTICLE XIII
CONFLICT WITH OTHER ORDINANCES
This Ordinance shall not in any way impair or remove the necessity of compliance with any
other applicable rule, ordinance, regulation, bylaw, permit, or provision of law. Where this
Ordinance imposes a greater restriction upon the use of land, buildings, or structures, the
provisions of this Ordinance shall control.
ARTICLE XIV
DEFINITIONS
Unless specifically defined below, words and phrases used in this Ordinance shall have the
same meaning as they have at common law, and to give this Ordinance its most reasonable
application. Words used in the present tense include the future, the singular number includes
the plural, and the plural number includes the singular. The word "may" is permissive; "shall"
is mandatory and not discretionary.
Accessory Structure - a structure which is on the same parcel of property as a principal
structure and the use of which is incidental to the use of the principal structure.
CHAPTER 315
22
Adjacent Grade - the natural elevation of the ground surface prior to construction next to the
proposed walls of a structure.
Agricultural Structure - structures that are used exclusively for agricultural purposes or
uses in connection with the production, harvesting, storage, raising, or drying of agricultural
commodities and livestock. Structures that house tools or equipment used in connection with
these purposes or uses are also considered to have agricultural purposes or uses.
Area of Special Flood Hazard - land in the floodplain having a one percent or greater
chance of flooding in any given year, as specifically identified in the Flood Insurance Study
cited in Article I of this Ordinance.
Base Flood - a flood having a one percent chance of being equaled or exceeded in any
given year, commonly called the 100-year flood.
Basement - any area of a building that includes a floor that is subgrade (below ground level)
on all sides.
Breakaway Wall - a wall that is not part of the structural support of the building and is
intended through its design and construction to collapse under specific lateral loading forces,
without causing damage to the elevated portion of the building or supporting foundation
system.
Building - see Structure.
Certificate of Compliance - a document signed by the Code Enforcement Officer stating
that a structure is in compliance with all of the provisions of this Ordinance.
Coastal AE Zone - The portion of the Coastal High Hazard Area with wave heights between
1.5 feet and 3.0 feet and bounded by a line labeled the "Limit of Moderate Wave Action"
(LiMWA) on a Flood Insurance Rate Map (FIRM). VE Zone floodplain construction standards
are applied to development, new construction, and substantial improvements in the Coastal
AE Zone.
Coastal High Hazard Area - An area of special flood hazard extending from offshore to the
inland limit of a primary frontal dune along an open coast and any other area subject to high
velocity wave action from storms or seismic sources. Coastal High Hazard Areas are
designated as Zone VE and Zone AE bounded by a line labeled "Limit of Moderate Wave
Action" (LiMWA) on a Flood Insurance Rate Map (FIRM).
Code Enforcement Officer - a person certified under Title 30-A MRSA, Section 4451
(including exceptions in Section 4451, paragraph 1) and employed by a municipality to
enforce all applicable comprehensive planning and land use laws.
CHAPTER 315
23
Conditional Use - a use that, because of its potential impact on surrounding areas and
structures, is permitted only upon review and approval by the Planning Board pursuant to
Article VII.
Containment Wall - a wall surrounding all sides of an above ground tank to contain any
spills or leaks.
Development - any manmade change to improved or unimproved real estate. This includes,
but is not limited to, buildings or other structures; mining, dredging, filling, grading, paving,
excavation, drilling operations or storage of equipment or materials; and the storage,
deposition, or extraction of materials.
Elevated Building - a non-basement building that is:
a. built, in the case of a building in Zones A or AE, so that the top of the elevated floor, or
in the case of a building in Zone VE or Coastal AE Zone, to have the bottom of the
lowest horizontal structural member of the elevated floor, elevated above the ground
level by means of pilings, columns, posts, or piers; and,
b. adequately anchored to not impair the structural integrity of the building during a flood
of up to one foot above the magnitude of the base flood.
In the case of Zones A or AE, Elevated Building also includes a building elevated by means
of fill or solid foundation perimeter walls with hydraulic openings sufficient to facilitate the
unimpeded movement of flood waters, as required in Article VI.N. In the case of Zone VE and
Coastal AE Zone, Elevated Building also includes a building otherwise meeting the definition
of elevated building, even though the lower area is enclosed by means of breakaway walls, if
the breakaway walls meet the standards of Article VI.R.3.b.(3).
Elevation Certificate - an official form (FEMA Form FF-206-FY-22-152, as amended) that is
used to verify compliance with the floodplain management regulations of the National Flood
Insurance Program.
Existing Manufactured Home Park or Subdivision - a manufactured home park or
subdivision that was recorded in the deed registry prior to the adoption date of the
community's first floodplain management regulations.
Flood or Flooding -
a. A general and temporary condition of partial or complete inundation of normally dry
land areas from:
1. The overflow of inland or tidal waters.
2. The unusual and rapid accumulation or runoff of surface waters from any source.
CHAPTER 315
24
b. The collapse or subsidence of land along the shore of a lake or other body of water as
a result of erosion or undermining caused by waves or currents of water exceeding
anticipated cyclical levels or suddenly caused by an unusually high water level in a
natural body of water, accompanied by a severe storm, or by an unanticipated force of
nature, such as flash flood or an abnormal tidal surge, or by some similarly unusual
and unforeseeable event which results in flooding as defined in paragraph a.1. of this
definition.
Flood Elevation Study - an examination, evaluation, and determination of flood hazards
and, if appropriate, corresponding water surface elevations.
Flood Insurance Rate Map (FIRM) - an official map of a community, on which the Federal
Insurance Administrator has delineated both the special hazard areas and the risk premium
zones applicable to the community.
Flood Insurance Study - see Flood Elevation Study.
Floodplain or Floodprone Area - any land area susceptible to being inundated by water
from any source (see Flood or Flooding).
Floodplain Management - the operation of an overall program of corrective and preventive
measures for reducing flood damage, including but not limited to emergency preparedness
plans, flood control works, and floodplain management regulations.
Floodplain Management Regulations - zoning ordinances, subdivision regulations, building
codes, health regulations, special purpose ordinances (such as a floodplain ordinance,
grading ordinance, and erosion control ordinance), and other applications of police power.
The term describes such state or local regulations, in any combination thereof, which provide
standards for the purpose of flood damage prevention and reduction.
Floodproofing - any combination of structural and non-structural additions, changes, or
adjustments to structures which reduce or eliminate flood damage to real estate or improved
real property, water and sanitary facilities, structures, and contents.
Floodway - see Regulatory Floodway.
Floodway Encroachment Lines - the lines marking the limits of floodways on federal, state,
and local floodplain maps.
Freeboard - a factor of safety usually expressed in feet above a flood level for purposes of
floodplain management. Freeboard tends to compensate for the many unknown factors,
such as wave action, bridge openings, and the hydrological effect of urbanization of the
watershed, which could contribute to flood heights greater than the height calculated for a
selected size flood and floodway conditions.
CHAPTER 315
25
Functionally Dependent Use - a use which cannot perform its intended purpose unless it is
located or carried out in close proximity to water. The term includes only docking facilities,
port facilities that are necessary for the loading and unloading of cargo or passengers, and
ship building and ship repair facilities, but does not include long-term storage or related
manufacturing facilities.
Historic Structure - any structure that is:
a. Listed individually in the National Register of Historic Places (a listing maintained by
the Department of Interior) or preliminarily determined by the Secretary of the Interior
as meeting the requirements for individual listing on the National Register;
b. Certified or preliminarily determined by the Secretary of the Interior as contributing to
the historical significance of a registered historic district or a district preliminarily
determined by the Secretary of the Interior to qualify as a registered historic district;
c. Individually listed on a state inventory of historic places in states with historic
preservation programs which have been approved by the Secretary of the Interior; or,
d. Individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified either:
1. By an approved state program as determined by the Secretary of the Interior, or,
2. Directly by the Secretary of the Interior in states without approved programs.
Limit of Moderate Wave Action (LiMWA) - The landward limit of the 1.5 foot breaking wave
within a Coastal AE Zone. These areas are bounded by a line labeled "Limit of Moderate
Wave Action" (LiMWA) on a Flood Insurance Rate Map (FIRM). The LiMWA line delineates
that portion of the Special Flood Hazard Area (SFHA) landward of a VE zone in which the
principal sources of flooding are astronomical high tides, storm surges, or tsunamis, not
riverine sources. These areas may be subject to wave effects, velocity flows, erosion, scour,
or combinations of these forces. The floodplain development and construction standards for
VE Zones will be applied in the Coastal AE Zone.
Locally Established Datum - for purposes of this ordinance, an elevation established for a
specific site to which all other elevations at the site are referenced. This elevation is generally
not referenced to the National Geodetic Vertical Datum (NGVD), North American Vertical
Datum (NAVD), or any other established datum and is used in areas where Mean Sea Level
data is too far from a specific site to be practically used.
Lowest Floor - the lowest floor of the lowest enclosed area (including basement). An
unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access,
or storage in an area other than a basement area is not considered a building's lowest floor,
provided that such enclosure is not built so as to render the structure in violation of the
applicable non-elevation design requirements described in Article VI.N. of this Ordinance.
CHAPTER 315
26
Manufactured Home - a structure, transportable in one or more sections, which is built on a
permanent chassis and is designed for use with or without a permanent foundation when
connected to the required utilities. For floodplain management purposes the term
manufactured home also includes park trailers, travel trailers, and other similar vehicles
placed on a site for greater than 180 consecutive days.
Manufactured Home Park or Subdivision - a parcel (or contiguous parcels) of land divided
into two or more manufactured home lots for rent or sale.
Mean Sea Level - for the purposes of the National Flood Insurance Program, the National
Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD), or other
datum, to which base flood elevations shown on a community's Flood Insurance Rate Map
are referenced.
Minor Development - all development that is not new construction or a substantial
improvement, such as repairs, maintenance, renovations, or additions, whose value is less
than 50% of the market value of the structure. It also includes but is not limited to: accessory
structures as provided for in Article VI.L., mining, dredging, filling, grading, paving,
excavation, drilling operations, storage of equipment or materials, deposition or extraction of
materials, public or private sewage disposal systems or water supply facilities that do not
involve structures; and non-structural projects such as bridges, dams, towers, fencing,
pipelines, wharves, and piers.
National Geodetic Vertical Datum (NGVD) - the national vertical datum, a standard
established in 1929, which is used by the National Flood Insurance Program (NFIP). NGVD
is based upon mean sea level in 1929 and has been called "1929 Mean Sea Level" (MSL).
New Construction - structures for which the "start of construction" commenced on or after
the effective date of the initial floodplain management regulations adopted by a community
and includes any subsequent improvements to such structures.
North American Vertical Datum (NAVD) - the national datum whose standard was
established in 1988, which is the new vertical datum used by the National Flood Insurance
Program (NFIP) for all new Flood Insurance Rate Maps. NAVD is based upon the vertical
data used by other North American countries such as Canada and Mexico and was
established to replace NGVD because of constant movement of the earth's crust, glacial
rebound and subsidence, and the increasing use of satellite technology.
100-year flood - see Base Flood.
Qualified Professional - an individual either licensed by the State of Maine or qualified in
another manner to perform the specified work in accordance with all applicable design
standards and codes, and whose qualifications indicate that the work as designed and as
performed will not increase flood risk to public safety. If the Qualified Professional is not
CHAPTER 315
27
licensed by the State of Maine, the local permitting authority shall request that the qualified
professional identify their qualifications in writing.
Recreational Vehicle - a vehicle that is:
a. built on a single chassis;
b. 400 square feet or less when measured at the largest horizontal projection, not
including slideouts;
c. designed to be self-propelled or permanently towable by a motor vehicle; and,
d. designed primarily not for use as a permanent dwelling but as temporary living
quarters for recreational, camping, travel, or seasonal use.
Regulatory Floodway -
a. the channel of a river or other water course and the adjacent land areas that must be
reserved in order to discharge the base flood without cumulatively increasing the
water surface elevation more than a designated height, and,
b. when not designated on the community's Flood Insurance Rate Map, it is considered
to be the channel of a river or other water course and the adjacent land areas to a
distance of one-half the width of the floodplain, as measured from the normal high
water mark to the upland limit of the floodplain.
Riverine - relating to, formed by, or resembling a river (including tributaries), stream, brook,
etc.
Special Flood Hazard Area - see Area of Special Flood Hazard.
Start of Construction - the date the building permit was issued, provided the actual start of
construction, repair, reconstruction, rehabilitation, addition, placement, substantial
improvement, or other improvement was within 180 days of the permit date. The actual start
means either the first placement of permanent construction of a structure on a site, such as
the pouring of slab or footings, the installation of piles, the construction of columns, or any
work beyond the stage of excavation; or the placement of a manufactured home on a
foundation. Permanent construction does not include land preparation, such as clearing,
grading, and filling; nor does it include the installation of streets and/or walkways; nor does it
include excavation for basement, footings, piers, or foundations or the erection of temporary
forms; nor does it include the installation on the property of accessory buildings, such as
garages or sheds not occupied as dwelling units or not part of the main structure. For a
substantial improvement, the actual start of construction means the first alteration of any wall,
ceiling, floor, or other structural part of a building, or modification of any construction element,
whether or not that alteration affects the external dimensions of the building.
CHAPTER 315
28
Structure - for floodplain management purposes, a walled and roofed building. A gas or
liquid storage tank that is principally above ground is also a structure.
Substantial Damage - damage of any origin sustained by a structure whereby the cost of
restoring the structure to its before damage condition would equal or exceed 50 percent of
the market value of the structure before the damage occurred.
Substantial Improvement - any reconstruction, rehabilitation, addition, or other
improvement of a structure, the cost of which equals or exceeds 50 percent of the market
value of the structure before the start of construction of the improvement. This term includes
structures which have incurred substantial damage, regardless of the actual repair work
performed. The term does not, however, include either:
a. Any project for improvement of a structure to correct existing violations of state or local
health, sanitary, or safety code specifications which have been identified by the local
code enforcement official and which are the minimum necessary to assure safe living
conditions; or,
b. Any alteration of a Historic Structure, provided that the alteration will not preclude the
structure's continued designation as a historic structure, and a variance is obtained
from the Board of Appeals.
Variance - a grant of relief by a community from the terms of a floodplain management
regulation.
Violation - the failure of a structure or development to comply with a community's floodplain
management regulations.
ARTICLE XV
ABROGATION
This ordinance repeals and replaces any municipal ordinance previously enacted to
comply with the National Flood Insurance Act of 1968 (P.L. 90-488, as amended).
ARTICLE XVI
DISCLAIMER OF LIABILITY
The degree of flood protection required by the ordinance is considered reasonable but
does not imply total flood protection.