This is the exact embedded text of the captured official document.
Snapshot 5d5adc16664f · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 2
ARTICLE 1 ... PURPOSES & CRITERIA OF APPROVAL
1.1
PURPOSE
The purpose of these Regulations is to assure the comfort, convenience, safety, health and welfare
of the people of the Town of York, to protect the environment, and to promote the development of
an economically sound and stable community. These Regulations shall be administered to ensure
orderly growth and development, and shall supplement and facilitate the provisions in the
Comprehensive Plan, the Zoning Ordinances, and the capital budget of the Town of York.
1.2
CRITERIA OF APPROVAL
Before granting approval to any application pursuant to this code, the Planning Board must find
that the proposal meets the following criteria (reference MRSA Title 30-A §4404) and shall make
written findings of fact to this effect.
1.2.1
Pollution. The development will not result in undue water or air pollution. In making this
determination, the Board shall at least consider the elevation of the land above sea level
and its relation to the floodplains, the nature of soils and subsoils and their ability to
adequately support waste disposal, the slope of the land and its effect on effluents, the
availability of streams for disposal of effluents, and applicable state and local health and
water resource rules and regulations;
1.2.2
Sufficient Water. The development has sufficient water available for the reasonably
foreseeable needs of the development;
1.2.3
Municipal Water Supply. The development will not cause an unreasonable burden of an
existing water supply, if one is to be utilized;
1.2.4
Erosion. The development will not cause unreasonable soil erosion or a reduction in the
capacity of the land to hold water so that a dangerous or unhealthy condition results;
1.2.5
Traffic. The development will not cause unreasonable highway or public road congestion
or unsafe conditions with respect to use of the highways or public roads existing or
proposed, and if the proposed development requires driveways or entrances onto a state
or state-aid highway located outside the urban compact area of an urban compact
municipality as defined by Title 23 §754, the Maine Department of Transportation has
provided documentation indicating that the driveways or entrances conform to Title 23
§704 and any rules adopted under that section;
1.2.6
Sewage Disposal. The development will provide for adequate sewage waste disposal and
will not cause an unreasonable burden on municipal services if they are utilized;
1.2.7
Municipal Solid Waste Disposal. The development will not cause an unreasonable burden
on the Town's ability to dispose of solid waste if municipal services are to be utilized;
1.2.8
Aesthetic, Cultural and Natural Values. The development will not have an undue adverse
effect on the scenic or natural beauty of the area, aesthetics, historic sites, significant
wildlife habitat identified by the Department of Inland Fishers and Wildlife or the
municipality, or rare and irreplaceable natural areas or any public rights for physical or
visual access to the shoreline;
1.2.9
Conformity with Local Ordinances and Plans. The development is in conformance with
these Regulations, Zoning and other Town land use codes, and the Comprehensive Plan.
In making this determination, the Planning Board is authorized to interpret these
Ordinances and Plans.
1.2.10
Technical and Financial Capacity. The developer has adequate financial and technical
capacity to meet the required standards;
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 3
1.2.11
Surface Waters. Whenever situated entirely or partially within the watershed of any pond
or lake or within 250 feet of wetland, great pond or river as defined in Title 38, Chapter 3,
Subchapter 1, Article 2-B, the proposed development will not adversely affect the quality
of that body of water or unreasonably affect the shoreline of that body of water.
1.2.12
Ground Water. The development will not, alone or in conjunction with existing activities,
adversely affect the quality or quantity of groundwater.
1.2.13
Flood Areas. Based on the Federal Emergency Management Agency's Flood Boundary
and Floodway Maps and Flood Insurance Rate Maps, and information presented by the
applicant, the Planning Board will determine whether the development is in a flood-prone
area. If the development, or any part of it, is in such an area, the developer shall
determine the 100-year flood elevation and flood hazard boundaries within the
development. The proposed plan must include a condition of approval requiring that
principal structures in the development will be constructed with their lowest floor,
including the basement, at least two feet above the 100-year flood elevation.
1.2.14
Freshwater Wetlands. All freshwater wetlands within the proposed development have
been identified on any maps submitted as part of the application, regardless of the size of
these wetlands.
1.2.15
River, Stream or Brook. Any river, stream or brook within or abutting the proposed
development has been identified on any maps submitted as part of the application. For
purposes of this section, "river, stream or brook" has the same meaning as in Title 38 §480-
B.9.
1.2.16
Stormwater. The proposed development will provide for adequate erosion and
sedimentation control during construction and stormwater quality and quantity treatment
after construction including maintenance of stormwater infrastructure that will remain in
private ownership.
1.2.17
Spaghetti Lots Prohibited. If any lots in a proposed subdivision have shore frontage on a
river, stream, brook, great pond or coastal wetland as these features are defined in Title 38
§480-B, none of the lots created within the subdivision have a lot-depth-to-shore-frontage
ratio greater than 5 to 1.
1.2.18
Lake Phosphorous Concentration. The long-term cumulative effects of the propose
development will not unreasonably increase a great pond's phosphorous concentration
during the construction phase and life of the proposed development.
1.2.19
Impact on Adjoining Municipality. For any proposed development that crosses municipal
boundaries, the proposed development will not cause unreasonable traffic congestion or
unsafe conditions with respect to the use of existing public ways in an adjoining
municipality in which part of the development is located.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 4
ARTICLE 2 ... AUTHORITY AND ADMINISTRATION
2.1
AUTHORITY
2.1.1
These Regulations have been adopted in accordance with the provisions of Title 30-A
M.R.S.A., Sections 4401 through 4407.
2.1.2
These Regulations shall be known and may be cited as the "Subdivision and Site Plan
Regulations of the Planning Board of the Town of York", and are hereinafter referred to as
"the Regulations".
2.2
ADMINISTRATION
2.2.1
The Planning Board of the Town of York, hereinafter called "the Board", and the Code
Enforcement Officer of the Town of York shall administer these standards.
2.2.2
The provisions in these Regulations shall pertain to all land within the boundaries of the
Town of York proposed for subdivision as defined in these Regulations, Title 30-A M.R.S.A.,
Section 4401 and in the Town of York's Functional Subdivision Site Plan Review
Ordinance.
2.2.3
These Regulations shall become effective on the date of adoption by the Planning Board.
2.2.4
This Ordinance may be amended by a majority vote of the Planning Board after holding 2
public hearings. Prior notice of the hearings shall be provided to the public at least 7 days
prior to the hearing. At a minimum, notice shall be posted in Town Hall and published in a
newspaper that has general circulation in the community.
2.3
FEES
2.3.1
The fees for Planning Board review of projects under these Regulations shall be as follows:
A.
Fees shall be paid prior to an application being reviewed by staff. The amounts
are as follows:
1.
Sketch Plan: $450.00 per meeting
2.
Subdivision: $800.00 plus $320.00 per lot and/or dwelling unit.
3.
Site Plan: $800.00 plus:
a.
$320.00 per additional dwelling unit; and
b.
$0.16 per square foot of gross floor area for non-residential
uses.
4.
Revisions to Approved Plans: $320.00 plus:
a.
$320.00 per additional lot and/or dwelling unit for revisions to
approved subdivision plans; or
b.
$0.16 per square foot of gross floor area of building expansion
to a non-residential or mixed-use site plan.
c.
For a change of use, no additional fees.
Application fees shall be utilized by the Planning Department to cover any
expense associated with the review of the project, including but not limited to
the costs of in-house staff review, recording secretary, printing, postage, archival
of records, scanning of records, posting of notices, and legal advertising.
Application fees may also be utilized by the Planning Department for staffing
needs associated with the Planning Department.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 5
B.
Duplicate Fees. In the event an application requires both Subdivision and Site
Plan review (ie: a new multi-family building), the applicant shall pay the higher of
the Subdivision or Site Plan fees, but not both.
C.
Reserved.
D.
Reimbursement for Outsourced Technical Assistance. The Planning Board is
authorized to secure independent professional assistance to ensure proper and
thorough review of applications and construction inspection of approved
projects. The applicant shall pay the full cost of this professional service. Such
costs shall be in addition to the application fee.
2.3.2
Fees for Inspection - Before final approval, the applicant must deposit an amount equal to
2% of the estimated cost of the required improvements (per Sections 6.4.18 and 6.4.19)
with the Planning Board to pay for the costs of Town inspection of the public
improvements in the project. Whenever the balance in this account is drawn down by
75% of the initial balance, the Town shall notify the applicant, and require that an
additional 1% be deposited by the applicant. All further inspections by the Town Engineer
and any public improvement construction except such as shall be determined by the
Town Engineer or Code Enforcement Officer as being necessary to provide for public
health, safety and welfare shall cease until the additional deposit is made. Any balance in
the account remaining after any Performance Guarantee has been released shall be
returned to the applicant. Any interest accrued shall remain with the Town.
2.4
INTERPRETATION, CONFLICT AND SEVERABILITY
2.4.1
The provisions of these regulations shall be construed as minimum requirements. More
stringent provisions may be required if it is demonstrated that such are necessary to
promote the public health, safety and welfare.
2.4.2
Where the conditions imposed by any provisions of these Regulations are either more
restrictive or less restrictive than comparable conditions imposed by any other provisions
of these Regulations or any other applicable law, ordinance, or regulation of any kind, the
regulations which are more restrictive and impose higher standards or requirements shall
govern.
2.4.3
The provisions of these Regulations are separable. If any portion of these Regulations is
declared by the courts to be invalid, the decision shall not affect the validity of the
remaining portions of these Regulations.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 6
ARTICLE 3 ... DEFINITIONS
3.1
Certain words and terms used herein are defined as follows. Any word not specifically defined here
shall take on the customary dictionary definition.
3.1.1
COMPLETE APPLICATION - An application which has been reviewed by the Planning
Board and found by the Planning Board to contain all the submissions required by these
Regulations including the applicable fees. The Planning Board may waive the submission
of required information in response to a written request submitted with the application.
The Board, or other authorized agent shall issue a receipt to the applicant upon the
determination by the Planning Board that an application is complete.
3.1.2
COMPREHENSIVE PLAN OR POLICY STATEMENT - Any part or element of the overall plan
or policy for development of the Town as defined in Title 30-A M.R.S.A., Sections 4301-
4344, and as amended.
3.1.3
CONSTRUCTION OR DEMOLITION DEBRIS - Materials and spoil resulting from
construction, remodeling, repair or demolition of structures including building materials,
wall board, pipes, metal conduits, and other mixed materials, used in the construction of a
building, but excluding special wastes as defined by the Department of Environmental
Protection's Solid Waste Rules.
3.1.4
CONSTRUCTION ACTIVITY - Any activity on a development that results in Disturbed Area.
3.1.5
DEVELOPED AREA - Any area on which a site improvement or change is made, including
but not limited to, buildings, landscaping, lawns and parking areas.
3.1.6
DISTURBED AREA - All land areas of a development that are stripped, graded, grubbed,
filled, or excavated at any time during the site preparation or removing vegetation for, or
construction of, a project. Cutting of trees, without grubbing, stump removal, disturbance,
or exposure of soil is not considered Disturbed Area. Disturbed Area does not include
routine maintenance but does include redevelopment and new Impervious Areas.
"Routine maintenance" is maintenance performed to maintain the original line and grade,
hydraulic capacity, and original purpose of the facility. Paving impervious gravel surfaces
provided that an applicant or permittee can prove the original line and grade and
hydraulic capacity shall be maintained and original purpose of the gravel surface remains
the same is considered routine maintenance. Replacement of a building is not considered
routine maintenance of the building and is therefore considered Disturbed Area.
3.1.7
DWELLING UNIT - One or more rooms used for or arranged for the use of one or more
individuals living together as a single housekeeping unit, with cooking, living, sanitary and
sleeping facilities.
3.1.8
EROSION AND SEDIMENTATION CONTROL BEST MANAGEMENT PRACTICES - Schedules
of activities, prohibitions of practices, maintenance procedures, and other methods,
techniques, designs, and management practices to prevent or reduce the pollution of
Waters of the State and to control erosion (Erosion Control BMPs) and sedimentation
(Sedimentation Control BMPs). BMPs also include treatment requirements, operating
procedures, and practices to control development runoff, spillage or leaks, sludge or waste
disposal, or drainage from raw material storage.
3.1.9
FINAL SUBDIVISION PLAN - The final drawings on which the developer's plan or
subdivision is presented to the Board for approval and which if approved will be recorded
at the Registry of Deeds.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 7
3.1.10
Qualified Erosion and Sedimentation Professional - A person who has been certified by
Enviro-Cert International in erosion and sedimentation control practices or has been
certified by completing the Maine Department of Environmental Protection Erosion and
Sedimentation Control Practices Workshop, or is a Maine Professional Engineer with at
least two years' experience in designing Erosion and Sedimentation Control Best
Management Practices
3.1.11
FLOOD (100 YEAR) - The highest level of flood that, on the average, is likely to occur once
every 100 years (i.e. that has a one percent change of occurring in any year).
3.1.12
HIGH INTENSITY SOIL SURVEY - A drawing prepared by a Certified Soil Scientist, licensed in
the State of Maine, identifying the soil types on 1/8 acre or less at a scale consistent with
the plan submitted. The soils shall be identified in accordance with the National
Cooperative Soil Survey. The map shall show the location of all test pits used to identify
the soils, and shall be accompanied by a log of each sample point identifying the textural
classification and depth to seasonal high water table or bedrock at that point. Soil test pits
and their evaluation for suitability for subsurface wastewater disposal systems shall not be
considered to constitute high intensity soil surveys.
3.1.13
INDUSTRIAL PARK OR DEVELOPMENT - An area zoned and planned for varied industrial
uses and which may be developed and managed as a unit, usually with provision for
common services for the users.
3.1.14
NET DEVELOPABLE ACREAGE - The total acreage available for the Site Plan or subdivision
as shown on the proposed Subdivision Plan minus: 1) the area for rights-of-way for streets,
2) other areas of rights-of-way and access, and 3) areas which are unsuitable for
development as outlined in Section 7.4.
3.1.15
NORMAL HIGH WATER MARK OF COASTAL WATERS - Along the shore of all tidal waters,
the Normal High Water Mark shall be determined as follows:
a.
The Normal High Water Mark of Coastal or Tidal Waters shall be
determined as that elevation at which vegetation changes from
predominately tolerant of saltwater inundation to predominately
intolerant of salt water inundation. Where vegetation is not present, the
elevation shall be used from the nearest area where it can be
determined by the above method.
b.
Where rivers, streams or other waterbodies are still tidal but support
primarily fresh water vegetation, the Normal High Water Mark of Inland
Waters shall be used.
c.
In the event that it is not possible to determine the Normal High Water
Mark in the above manner, the elevation of the average of the highest
predicted tidal levels each year for York for the most recent 19 year tidal
epoch shall be used. For the 1960-1978 tidal epoch the elevation used
shall be 10.8 feet above Mean Low Water (MLW) which is equivalent to
6.9 feet above National Geodetic Vertical Datum (NGVD), based on
current tidal benchmark sheets available from the National Ocean
Service.
This elevation may be measured relative to the N.O.S. benchmark 8419518 York, Maine, or
relative to NGVD. Since data indicates that tidal elevations are rising in this area, the tidal
datum are updated based on 19 year tidal epochs, the elevation used shall reflect the most
recent tidal epoch, and current Tidal Benchmarks and tidal datum information should be
obtained from the National Ocean Service (U.S. Department of Commerce/NOAA).
All measurements from the Normal High Water Mark shall be made horizontally and all
setbacks shall be laid out parallel to the High Water Mark.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 8
3.1.16
NORMAL HIGH WATER MARK OF INLAND WATERS - That elevation on the shores and
banks of ponds, great ponds, rivers, streams and inland or freshwater wetlands, which is
apparent because of the prolonged action or presence of the water. Relative to
vegetation, it is that elevation where the vegetation changes from predominately aquatic
or wetland species to predominately upland or non-wetland species. In places where the
shore or bank is of such character that the high water mark cannot be easily determined
(rock slides, ledges, rapidly eroding or slumping banks) the normal high water mark
elevation shall be measured from the nearest area where it can be determined by the
above method.
3.1.17
PERSON - Includes a firm, association, organization, partnership, trust, company or
corporation, as well as an individual.
3.1.18
PLANNING BOARD - The Planning Board of the Town of York.
3.1.19
PRELIMINARY SUBDIVISION PLAN - The preliminary drawings indicating the proposed
layout of the subdivision and other supporting documentation as required by Section 6.3
to be submitted to the Planning Board for its consideration.
3.1.20
PUBLIC IMPROVEMENTS - Any aspect of the Final Plan that is imposed by the Planning
Board for the public good, including but not limited to roads, sidewalks, curbs, drainage,
detention ponds, erosion and sedimentation control, water lines, sewer lines or any other
means of sewage disposal, hydrants, fire ponds, dry hydrants, required landscaping, parks
and recreation areas, electrical and telephone service, and street lighting.
3.1.21
REVISION TO AN APPROVED PLAN - The division of any lot in an existing subdivision, or
any change of an approved plan which affects any lot line, lot size, the location of any
street, or any revision to any aspect of the plan that is under the jurisdiction of the
Planning Board.
3.1.22
SITE PLAN (MAJOR) - Any non-residential development in which 10,000 square feet or
more of floor space is developed or constructed within a five year period.
3.1.23
SITE PLAN (MINOR) - Any non-residential development in which less than 10,000 square
feet of floor space is constructed within a five-year period.
3.1.24
STREET - Public and private ways designed for the passage of motor vehicles such as
avenues, boulevards, highways, and roads, and their associated rights-of-way. Due to the
similarity of the two terms, the terms "road" and "street" are used interchangeably in these
Regulations and are intended to have the same meaning.
STREET CLASSIFICATION
Streets serve two primary functions: to provide access from adjacent properties onto the
transportation system, and to facilitate the movement of vehicles from one place to
another. Streets are classified based on their balance between these two functions, as
follows:
Arterial Street. A major thoroughfare which serves as a major traffic way for travel
between and through towns. The primary function of the arterial street is traffic
movement. Access to adjacent properties is limited, or in some cases prohibited.
Collector Street. A large street that collects traffic from minor streets and forms an integral
part of the overall street network. The primary function of the collector street is a
balance between traffic movement and property access. Access to adjacent
properties is allowed.
Minor Street. Also referred to as Local Street. A street designed to provide access to
adjacent properties and to discourage through traffic. The primary function of
the minor street is property access.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 9
3.1.25
SUBDIVISION - The definition of Subdivision in these Regulations shall be that in place in
State law, specifically Title 30-A §4401.4.
NOTE: The terms "Site Plan", "subdivision", and "development" may be used
interchangeably throughout these Regulations.
3.1.26
SUBDIVISION (MAJOR) - Any subdivision in which more than four (4) lots are created or
more than 4 dwelling units are created within a five-year period.
3.1.27
SUBDIVISION (MINOR) - Any subdivision in which not more than four (4) lots are created
or in which not more than 4 dwelling units are created within a five year period.
3.1.28
TOWN - The town of York, Maine.
3.1.29
TOWN ENGINEER - Any engineer or engineering firm with which the Town has
contracted to provide engineering services for assistance with the review of applications
and construction inspections.
3.1.30
TRACT OR PARCEL OF LAND - All contiguous land in the same ownership, whether or not
the tract is separated at any point by: 1) an intermittent or non-navigable stream, or 2)
tidal waters where there is no flow at low tide.
3.1.31
WOODWASTES - Uncontaminated brush, stumps, lumber, bark, wood chips, shavings,
slabs, edgings, slash and sawdust.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 10
ARTICLE 4 ... STANDARDS FOR SUBMITTALS, PLAN SHEETS AND REPORTS
4.1
SIZE
Based on size limits of the Town's flat files and document scanners, sheet size shall not exceed 24"
by 36."
4.2
MATERIAL
All plans provided to the Board shall be printed on paper, except as required for approval sheets
(see §4.8).
4.3
BASIC INFORMATION
All plans shall include the following information.
A.
Title Block. The title block shall indicate:
1.
Title of the sheet.
2.
Project name, if applicable.
3.
Name of the property owner.
4.
Name of the developer, if other than the owner.
5.
Property address, including Town and State.
6.
Name and address of the person or company that prepared the sheet.
B.
Scale. The scale of the plan shall be indicated in text and graphic form.
C.
North Arrow.
D.
Dates. On each sheet, the original date of preparation shall be indicated, along with the
date and nature of subsequent revisions.
4.4
MULTIPLE SHEETS
Where the size of the property and scale of the plan require multiple sheets, match lines shall be
provided.
4.5
SCALE
The scale of plans shall be suitable for the type of application and the size of the property. The
plans must strike a balance between detail and overview. In general, Site Plans should be at a scale
of 1" = 40' and Subdivision Plans should be at a scale of 1" = 100'. The plan of a building facade
shall be scaled to fit on a single sheet. The Board may require plans drawn to specific scales if it
experiences difficulty reading or interpreting scales other than those listed in this section.
4.6
AREA OF COVERAGE
Plans submitted pursuant to these Regulations shall depict the entire area and boundary of the
property. However, the Board may allow a plan that depicts only a portion of the property if the
Board finds the area of plan coverage is adequate for the development or change proposed.
4.7
PROFESSIONAL CERTIFICATION
Submittals, plan sheets and reports shall be prepared by Maine-licensed professionals where
required by State or Town law, and shall be certified by stamp and signature of the license-holder
prior to submittal to the Town. At a minimum, the following shall apply:
A.
Professional Land Surveyors. A Maine-licensed Professional Land Surveyor (PLS) shall
prepare all boundary surveys and existing conditions plans.
B.
Professional Engineers. A Maine-licensed Professional Engineer (PE), with appropriate
expertise and/or specialization, shall prepare all plans dealing with the design of physical
alteration of and/or improvements to the site. The PE may also prepare building plans in
lieu of having such plans prepared by an Architect where this practice is permitted by
State law.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 11
C.
Architects. A Maine-licensed Architect shall prepare all plans representing the physical as
required by State law showing alteration of existing buildings or construction of new
buildings, except where such plans may be prepared by a PE as permitted by State law.
Note that this includes all technical drawings including building façade plans.
D.
Landscape Architects. Unless noted elsewhere in these Regulations, a Maine-licensed
Landscape Architect is not required to prepare landscape plans. However, any plan
prepared by a Maine-licensed Landscape Architect must be properly certified.
E.
Soils Scientists. All soils maps and reports shall be prepared by a Maine-certified Soil
Scientist. This shall not apply to plans which depict soils data derived solely from the York
County Soils Survey.
4.8
APPROVAL SHEETS
In addition to other standards, the sheets which the Planning Board will sign to indicate its
approval of an application shall also meet the following requirements:
A.
The complete set of plans to be signed shall be printed on mylar.
B.
Each sheet in the plan set shall be signed in accordance with the following:
1.
Full Board. There shall be an approval block on the plan sheet(s) that depicts the
proposed design and the Plan Notes, for the signature of Board members:
a.
The title shall be, "Approval of the Planning Board of York, Maine."
b.
There shall be 5 signature and date lines. The first line shall be labeled
"Chair" under the line and is to be signed by the Chair only.
c.
A note at the bottom of the block that states, "The signatures of 3 or
more Planning Board members indicate approval of this plan."
2.
Chair Only. There shall be a signature block on all sheets not signed by the
Board, and this shall be used for the Chair only to sign to indicate original sheets
in the approved plan set.
3.
Town Departments. The following departments may be required to review the
application, offer comments to the Planning Board, and sign the plans to indicate
they have reviewed the plan. Their input does not constitute an approval or
denial. The sheet that depicts the proposed design and that is signed by the full
Board shall also include a sign-off block for the York Police Department, York
Village Fire Department or York Beach Fire Department, and York Public Works
Department. The following shall be required:
a.
The title shall be, "Town Department Reviews"
b.
There shall be a signature and date line for each Department required
to review the application.
c.
A note at the bottom of the block that states, "This application has been
reviewed by these departments, which have offered comments to the
Planning Board."
4.
Water and Sewer Districts. For applications that will connect to municipal water
and/or sewer systems, approval of these independent quasi-municipal districts is
required. The sheet that depicts the proposed design and that is signed by the
full Board shall also include a sign-off block for the utility district(s) involved. The
following shall be required:
a.
The title shall be, "Utility District Approvals."
b.
There shall be a signature and date line for each District to indicate its
approval of the application.
c.
A note at the bottom of the block that states, "This application has been
reviewed and approved by the utility districts, as indicated by the
signature of their superintendents."
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 12
C.
Plan notes shall be provided to document the nature, terms and conditions of approval,
including at a minimum, the following:
1.
A list indicating the title and most recent date of revision for all supplemental
sheets in the plan set.
2.
Reference to all existing and proposed easements, covenants and deed
restrictions.
3.
Indication of the base zoning district(s), any applicable overlay zoning districts,
and any other applicable regulatory designations.
4.
List of all waivers granted by the Planning Board.
5.
Other as required by the Board, including but not limited to notes that impose
restrictions, limitations or other requirements.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 13
ARTICLE 4-A ... SITE PLANNING FOR TEMPORARY EVENTS
4.1
APPLICABILITY
Temporary non-residential private activities which require 25 or more parking spaces
shall require Site Plan approval from the Planning Board as a Temporary Event.
Temporary events shall include one-time-only events, and regularly recurring events
which occur not more than annually. In either case, duration of a temporary event shall
not exceed 3 days. Temporary events shall be reviewed under the standards of this
Article, and shall not be subject to other provisions of these Regulations.
4.2
PROCEDURES
The application review process shall follow the procedures for a minor Site Plan review
with concurrent preliminary and final review, as described in Article 5.
4.3
SUBMITTAL REQUIREMENTS
An application shall provide 10 copies of an application packet. Each packet shall
include the following information:
A.
Site Sketch. The applicant shall provide a sketch of the proposed site layout for
the temporary event. This sketch shall also show the relationship to neighboring
properties and roads.
B.
Aerial Photograph. The applicant shall utilize the computer mapping available
on the Town's web page (www.yorkmaine.org, and find links to "GIS Maps") to
show an aerial photograph of the site. This may be a black & white photocopy of
such a photograph. The approximate location and orientation of the site sketch
shall be sketched onto this photo.
C.
Project Narrative. The applicant shall prepare a written description of the
proposed temporary event, to include the following:
1. Describe the event, including anticipated attendance.
2. Date(s) of the event.
3. Proposed hours of operation.
4. Description of applicable Town ordinances and regulations (Zoning
Ordinance, Noise Ordinance, etc.) and how this event will comply with all
such codes.
5. Impact mitigation for:
a. parking for the anticipated number of vehicles;
b. pedestrian safety;
c. traffic control plan approved by the Chief of Police;
d. trash disposal and recycling;
e. toilet facilities, including potable water;
f.
noise control;
g. site restoration; and
h. other as may be deemed applicable to the circumstances by the Board.
6. Document contact with the Police Department and Fire Department for their
review of public safety concerns.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 14
4.4
CRITERIA FOR APPROVAL
An application may be approved, approved with conditions, or denied. This decision
shall be based on compliance with the following criteria:
A.
The Board finds the applicant's submittals accurately represent the activity
proposed.
B.
The Board finds the event is temporary only, as defined in Section 1.
C.
The Board finds the proposed use(s) or activities will not violate any applicable
Town ordinance or regulations.
D.
The Board receives written approval from the Chief of Police and the appropriate
Fire Chief.
E.
The Board finds the applicant has proposed adequate mitigation of likely adverse
impacts.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 15
ARTICLE 5 ... APPLICATION PROCEDURE
5.1
GENERAL
5.1.1
If the tract of land containing a proposed development lies in more than one town, York
Planning Board approval of that project is required in addition to any review that is
required by the neighboring municipality. This provision shall not apply if there are to be
no improvements and no impacts on the portion of the property which lies within the
Town of York. Arrangements for the joint, or coordinated review of the project should be
established with the Planning Department at the start of the project.
5.1.2
Application to the Town. Each applicant shall complete a standard application form
provided by the Town prior to appearing before the Planning Board. For purposes of
administration and enforcement of this regulation, the owner of the property shall be
considered the applicant.
5.1.3
Number of Active Applications. There shall be no more than one active Planning Board
application on a property at any time. An application shall be considered active beginning
at the initial submittal of an application, and shall end when the Planning Board reaches
its final decision on the application and either: 1) if no appeal is filed per §13.1, when the
appeal deadline expires, or 2) if an appeal is filed per §13.1, when all activity relating to the
appeal is completed and the matter is resolved.
5.1.4
In order to avoid unnecessary delays in processing applications for review, the Planning
Board shall prepare an agenda for each regularly scheduled meeting. The agenda shall
be written and posted one week before the regularly scheduled meeting.
5.1.5
Approval Required Prior to Site Work. Prior to land clearing, site preparation, construction
or other such activity begins on a site, approval under these Regulations shall be required.
Subsequently, all such activity shall be in accordance with the approval.
5.2
PROCEDURE FOR SKETCH PLAN
5.2.1
Submission of sketch plan requirements (Section 6.1) to the Planning Department or
Planning Board. If an application is reviewed by the Board, 7 paper copies and an
electronic copy (PDF) of all submittals are required unless additional paper copies are
requested by the Planning Department.
5.2.2
Review of submissions of Sketch Plan by Code and Planning Department within thirty (30)
days of submission date. The Code and Planning Department will advise the applicant as
to which Ordinances/Regulations apply to the project. The Department shall determine if
a Sketch Plan for a Subdivision or Site Plan shall be subject to review by the Planning
Board. The purpose of Board review of a Sketch Plan is to allow the Board to ask
questions and make suggestions to be incorporated by the applicant into the application.
5.2.3
The Code and Planning Department shall notify owners of abutting property, including
property located directly across a street, by first class mail of any Sketch Plan application
scheduled for review by the Planning Board. This notice shall be sent a minimum of seven
days prior to the Board meeting, and shall include the location and a general description
of the proposed project, and the date, time and place of the meeting. When the
development abuts another municipality, or involves land within another municipality, the
Department shall also notify both the Town Clerk and the Planning Board of that
municipality.
5.2.4
The Planning Board may choose to conduct a public hearing on the Sketch Plan
application. Notice of the hearing to abutters shall be provided as stipulated in Section
5.2.3. Notice of the hearing shall be published in a newspaper of general circulation at
least one time and at least seven days prior to the hearing and shall be posted in Town
Hall.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 16
5.2.5
The submission or review of the Sketch Plan by the Code and Planning Department or
Planning Board shall not be considered the initiation of substantive review for the
purposes of bringing the Plan under the protection of Title 1, M.R.S.A., Section 302. The
applicant shall obtain no vested rights by submittal or review of a Sketch Plan.
5.3
PROCEDURE FOR PRELIMINARY PLAN
5.3.1
A minor subdivision or Site Plan may opt to submit all the information required for a
Preliminary and Final Plan in one step. A major subdivision must follow the two-step
process, unless waived by the Board.
5.3.2
The applicant must submit 7 paper copies of requirements and an electronic copy (PDF) of
requirements for the Preliminary Plan to the Planning Department unless the Planning
Department requests additional paper copies. The Planning Department will review the
application to determine if all necessary items were submitted. When the staff review
documents that a submittal was incomplete, subsequent reviews by staff may be
postponed until all other pending applications are reviewed. This review shall not
constitute a substantive review of the content of the submissions. When the Planning
Department determines that all necessary submissions have been made, a dated receipt
shall be issued and the project shall be placed on a Planning Board agenda within 30
days.
5.3.3
The Code and Planning Department shall notify owners of abutting property including
property located directly across a street by first class mail that the application has been
submitted. This notice shall be sent a minimum of 7 days prior to the Board meeting and
shall include the location and a general description of the project and date, time and
location of the Planning Board meeting. When the development abuts another
municipality, the Department shall also notify both the Town Clerk and the Planning
Board of that municipality.
5.3.4
Reserved
5.3.5
The applicant, or his duly authorized representative shall attend the meeting of the
Planning Board to discuss the Preliminary Plan.
5.3.6
The Board will review all submissions and make a written determination as to whether the
application is complete. If the Preliminary Plan application is found to be incomplete, the
Planning Board will notify the applicant in writing and specify the additional material
needed to complete the application. Substantive review shall not take place until the
Planning Board makes a formal vote to accept the Preliminary Plan application as
complete. When the Board determines the application is complete, it will take a formal
vote to "accept" the Preliminary Plan thus determining the application to be a complete
application (see Section 3.1.1). The board or other authorized agent will issue a receipt to
the applicant upon the determination that an application is complete. A formal vote by
the Planning Board to "accept" the complete application will bring the plan under the
protection of Title 1, M.R.S.A., Section 302.
5.3.7
The Planning Board will conduct a public hearing on a Preliminary Plan application. The
hearing shall be held within 30 days of the Board's acceptance of a complete application,
unless an extension is agreed to by both the Planning Board and the applicant. The Board
shall publish notice of the date, time and place of the hearing in a newspaper of general
circulation in the municipality, at least two (2) times, the date of the first publication to be
at least seven (7) days prior to the hearing and post the notice in at least three (3)
prominent places at least seven (7) days prior to the hearing. Notice of the hearing to
abutters shall be provided as stipulated in Section 5.3.3.
If any portion of a development is located within 500 feet of a municipal boundary, the
Planning Board will notify the Clerk and the Planning Board of the adjacent municipality
involved, at least ten (10) days prior to the hearing. If the Site Plan or subdivision is located
in more than one municipality, the Board may have a joint meeting with the Planning
Board of the adjacent municipality to discuss the Plan. Comments and recommendations
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 17
made by the Planning Board of the adjacent municipality shall be given due consideration
in the deliberations and decision-making process of the York Planning Board.
5.3.8
Within thirty days of a public hearing, or if no hearing is held, within sixty days of
determination by the Board that there is a complete application, or within another time
limit as may be otherwise mutually agreed to by the Board and the applicant, the Board
shall make Findings of Fact on the application, and approve, approve with conditions, or
deny the Preliminary Plan application. The Board shall specify, in writing, its Findings of
Fact and reasons for any conditions or denial.
5.3.9
When granting approval to a Preliminary Plan, the Planning Board shall state the
conditions of such approval, if any, with respect to: a) the specific changes which it will
require in the Final Plan; b) the character and extent of the required improvements for
which waivers may have been requested and which the Board finds may be waived
without jeopardy to the public health, safety, and general welfare and, c) the construction
items for which cost estimates and performance guarantees will be required as a
prerequisite to approval of the Final Plan.
5.3.10
Approval of the Preliminary Plan does not constitute approval of the Final Plan, or intent to
approve the Final Plan, but rather, it shall be deemed an expression of approval of the
design of the Preliminary Plan to be used as a guide to preparation of the Final Plan. Prior
to the approval of the Final Plan, the Board may require additional information be
submitted and changes in the Plan be made as a result of further study of the proposed
development from new information received.
5.4
PROCEDURE FOR FINAL PLAN
5.4.1
The applicant shall, within six months after the approval of the Preliminary Plan, submit to
the Planning Department 7 paper copies of a complete application and an electronic copy
of a complete application (PDF) for approval of the Final Plan unless the Planning
Department requests additional paper copies.
5.4.2
The Final Plan shall approximate the layout shown on the Preliminary Plan, including
changes required by the Board, and address all submission requirements for a Final Plan
stipulated in Regulation 6.4. The Code and Planning Department shall review the
application to determine if all required information has been submitted. When the staff
review documents that a submittal was incomplete, subsequent reviews by staff may be
postponed until all other pending applications are reviewed. If a Plan includes all
necessary submissions, the Department shall issue a dated receipt and schedule it for
review by the Planning Board within thirty (30) days. If a complete application for the
Final Plan is not submitted within six (6) months after Preliminary Plan approval, the Board
shall require submission of the Preliminary Plan, or may grant an extension to the
submission deadline. An extension must be requested in writing by the applicant prior to
the expiration of the filing period. In considering the request for an extension, the Board
shall make findings that the applicant has made due progress in preparing the Final Plan
and in pursuing approval of Plans before other agencies, and that municipal ordinances or
regulations which may impact the proposed development have not been amended.
5.4.3
The Code and Planning Department shall notify all parties who received notice of the
Preliminary Plan application by first class mail that a Final Plan application has been
submitted. This notice shall be sent a minimum of seven (7) days prior to the Board
meeting and shall include the location and a general description of the project and the
date, time, and location of the Planning Board meeting.
5.4.4
The Board will review the Final Plan submissions and make a written determination as to
whether the application is complete. Substantive review shall not take place until the
Planning Board makes a formal vote to accept the Final Plan application as complete. If
the Final Plan application is found to be incomplete, the Planning Board will notify the
applicant in writing and specify the additional material needed to complete the
application. When the Board determines that the application is complete, it will take a
formal vote to "accept" the Final Plan, thus determining the application to be a complete
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 18
application (see Section 3.1.1.). The Board, or other authorized agent will issue a receipt to
the applicant upon determination that an application is complete.
5.4.5
After the Planning Board has made a formal vote to accept the Final Plan application as
complete, the Plan will be forwarded to the Town Engineer for review. The Town
Engineer shall verify that all information has been correctly presented, and that the
technical aspects of the plans are in compliance with these Regulations.
5.4.6
The Planning Board shall conduct a public hearing on Final Plan application within thirty
(30) days after the Planning Board accepts the complete application for the Final Plan.
Notice of this hearing shall be advertised in a newspaper of local circulation at least two
(2) times, the date of the first publication to be at least seven (7) days prior to the hearing
and shall be posted in at least three (3) prominent places at least seven (7) days prior to
the hearing.
5.4.7
Before the Board grants approval of the Final Plan, the applicant shall meet the
performance guarantee requirements contained in Article 10, and shall pay the inspection
fee required in Section 2.3.2.
5.4.8
The applicant is responsible for obtaining all necessary approvals or permits required.
Final approval of the Final Plan shall be granted upon determination that all required
approvals and permits from agencies other than the Town of York have been obtained,
and advisory opinions have been received per §6.4.5.
5.4.9
The Board, 1) within thirty days from the public hearing, or 2) if no hearing is held, within
sixty days of receiving a complete final application, or 3) within another time limit as may
be otherwise mutually agreed to by the Board and applicant shall make Findings of Fact
and conclusions of law relative to the standards contained in Title 30-A M.R.S.A. Section
4404 and in these Regulations. If the Board finds that all standards of the Statute and
these Regulations and the Zoning Ordinances have been met, it shall approve the Final
Plan. If the Board finds that any of the standards of the Statute, of these Regulations, or
of the Zoning Ordinance have not been met, the Board shall either deny the application or
approve the application with conditions to ensure all of the standards shall be met by the
development. Conditions precedent shall be met by the applicant within one year or the
approval shall lapse. The reasons for any conditions shall be stated in the record of the
Board. Failure of the Board to act upon the plan shall not constitute approval of the plan.
5.5
FINAL APPROVAL AND FILING
5.5.1
No Plan shall be approved by the Board as long as the applicant is in violation of the
provisions of a previously approved Plan within the Town or in violation of Town of York
Zoning Ordinances.
5.5.2
Upon voting to approve the application the Board shall sign the Final Plan mylar, and the
Chair shall sign all supplemental sheets. The Final Plan set shall be on mylar or other
reproducible original for the Board's approval.
5.5.2.1 Subdivision Plans shall be filed by the applicant in the York County Registry of
Deeds per their filing requirements. Four paper prints of the signed plan, with
the Registry of Deeds official recording stamp along with one electronic copy
(PDF) shall be returned to the Planning Department; three printed copies for use
in the Planning Department and one copy for the Town Tax Assessor. Any
Subdivision Plan not recorded in the Registry of Deeds and returned to the
Planning Department within ninety days of the date upon which the plan is
approved and signed by the Board shall become null and void.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 19
5.5.2.2 Site Plans shall be returned to the applicant. Four paper prints of the signed
plans along with one electronic copy (PDF) shall be returned to the Planning
Department; 3 printed copies for use in the Planning Department and one copy
to the Town Tax Assessor. Any Site Plan not returned to the Planning Department
within ninety days of the date upon which the plan is approved and signed by
the Board shall become null and void. Site Plans filed with the York Country
Registry of Deeds shall follow the procedure outlined in §5.5.2.1.
5.5.3
At the time the Board grants Final Plan approval, the Board shall address phasing of the
subdivision as required in §7.30.
5.5.4
No changes, erasures, modifications, or revisions shall be made in any Final Plan after
approval has been given by the Board, unless the revised final Plan is first submitted and
the Board approves any modifications. The Board shall make findings that the revised
plan meets the standards of Title 30-A M.R.S.A. Section 4404, and these Regulations and all
applicable Town Ordinances. If a revised Plan is recorded without complying with this
requirement, it shall be considered null and void and the Board shall institute proceedings
to have the Plan stricken from the records of the Registry of Deeds.
5.5.5
Except in the case of a phased Subdivision Plan, failure to commence substantial
construction of a Site Plan or subdivision within three years of the date of approval and
signing of the Plan shall render the Plan null and void. Grading and earthmoving alone
shall not constitute substantial construction. Substantial construction shall not be deemed
to have taken place until the applicant has constructed improvements that use 25 percent
of the materials needed for required public improvements. Upon determining that a Site
Plan or subdivision's approval has expired under this paragraph, the Planning Board shall
have a notice placed in the Registry of Deeds to that effect.
5.6
REVISIONS TO APPROVED PLANS
5.6.1
If the revision involves revisions to these items normally submitted under the Preliminary
Plan phase, the procedures for a Preliminary and Final Plan approval shall be followed. If
the revision involves revisions to items normally submitted under the Final Plan phase,
without the creation of additional lots or dwelling units, only the procedures for Final Plan
approval shall be followed.
5.6.2
The applicant shall submit a copy of the approved plan, as well as the ten copies of the
proposed revisions. The application shall also include supporting documentation for any
and all aspects of the revised plan that fall under the jurisdiction of these Regulations. All
submissions shall be in the format described in the Submissions sections of these
Regulations (Article 6.3 and 6.4).
5.6.3
The Board's scope of review shall be limited to 1) those portions of the plan which are
proposed to be changed and 2) other areas affected directly or indirectly by the change.
The Board will review the application to make a determination as to if the proposed
revisions meet the standards of these Regulations and other applicable Codes and
Ordinances.
5.6.4
Any revisions to the original plan must be recorded in the Registry of Deeds, pursuant to
30-A M.R.S.A., Section 4407, after approval by the Board.
5.6.5
Field Changes. Minor changes made to previously approved Site Plans or Subdivisions
may be presented to the Planning Board for approval as Field Changes. Items that qualify
as Field Changes include:
-
color/material change to a building if these aspects of the building were specified in
the original approval;
-
minor grading changes that do not alter the drainage patterns or capacity of the
site;
-
planting substitutions that are equivalent in number and buffer effectiveness;
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 20
-
changes to approved outdoor lighting fixtures that have been reviewed and
approved by the Planning Board; and
-
other similar minor changes that do not substantially alter a prior approval.
None of the following shall be considered as Field Changes:
-
Changes that significantly reduce approved buffering or landscaping;
-
any change that involves a condition that was part of a previous conditional
approval;
-
any increase in the number of subdivision lots;
-
any alignment or material change to a public or private road and their rights of way
previously reviewed as part of a Site Plan or Subdivision;
-
any change to traffic circulation that effects safety;
-
any change that negatively effects the approved stormwater management plan for
the property;
-
any significant change to site layout such as building placement and building
footprint;
-
and any increase in wetland impact.
During construction, the applicant may propose Field Changes necessary to correct minor
construction-related errors on the design plans or to account for unexpected site
conditions. Field changes shall be prepared in writing and certified by the applicant's
professional engineer (or other design professional where appropriate). The Board shall
have the authority to approve or deny the Field Change, or determine it constitutes a
revision to an approved plan (see §5.6.1-3). Field Changes proposed after completion of
construction and granting of Final Occupancy shall be submitted prior to the change being
implemented. These changes shall also be accompanied by a statement from a design
professional where appropriate, as to the need for the change, and its impact to the site.
Any work completed prior to Planning Board approval is undertaken at the applicant's own
risk; work based on a Field Change that is denied shall be removed. This policy shall be
reflected in the plan notes (see §4.8.C.5), and any approved field changes shall be
acknowledged in the professional certifications (see §11.1). All Field Changes shall be
reviewed at the next scheduled Planning Board meeting.
5.7
PUBLIC ACCEPTANCE OF STREETS, RECREATION AREAS
5.7.1
The approval by the Planning Board of a Site Plan or Subdivision Plan shall not be deemed
to constitute or be evidence of any acceptance by the Town of any street, easement, or
other open space shown on such plan.
5.7.2
When a park, playground, or other recreation area shall have been shown on the Plan,
approval of the Plan shall not constitute or be evidence of, an acceptance by the Town of
such areas. The Planning Board shall require the Plan to be endorsed with appropriate
notes to that effect. The Board may require the filing or a written agreement between the
applicant and the Board of Selectmen covering future deed and title, dedication, and
provision for the cost of grading, development, equipment and maintenance of any such
recreation area.
5.8
SITE VISITS
The Planning Board may conduct a site visit for any application made to the Board. The following
standards shall apply to all site visits.
A.
The purpose of the site walk is solely to familiarize people with the physical conditions of
the site, and to understand the development concepts contained in the application.
B.
A site visit is a public meeting. As such, the Board shall:
1.
provide advance notice to the applicant, abutters and the public;
2.
permit anyone interested to attend the site visit; and
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 21
3.
shall reflect the following information about the site walk in the minutes of their
next regularly scheduled meeting: date, time, place, members in attendance.
C.
Because of the difficulty in keeping a large group together and focused on a single
conversation during a site walk, the Board shall not engage in substantive review or
discussions about the application during the site walk. The Board shall not make decisions
about the application during the site walk.
5.9
EX PARTE CONTACT
Members of the Planning Board shall not discuss applications with any involved party (applicant,
property owner, developer, neighbor, opponent, supporter, interested citizen, etc.) except at
Planning Board meetings. This is a legal requirement to ensure the Board members remain neutral
until all information is presented, to ensure that all Board members receive the same input from all
interested parties, and to ensure that all information presented to the Board is subject to cross
examination by people with different opinions.
5.10
SUBMITTAL OF SUPPLEMENTAL INFORMATION
When submitting supplemental information in advance of a Board meeting, the applicant shall
submit complete materials a minimum of 17 days in advance of the meeting at which the
application will be heard. Information submitted after this deadline shall not be considered by the
Board at the meeting.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 22
ARTICLE 6 - SUBMISSIONS
6.1
SUBMISSIONS FOR SKETCH PLAN
6.1.1
The Sketch Plan shall show, in simple sketch form, the proposed layout of streets, lots,
buildings and other features in relation to existing conditions. The Sketch Plan, which may
be a free-hand penciled sketch, should be supplemented with general information to
describe or outline the existing conditions of the site and the proposed development. The
Sketch Plan shall be accompanied by a copy of a portion of the U.S.G.S. topographic map
of the area showing the outline of the proposed development, unless the proposed
development is less than ten acres in size.
6.1.2
Any information that will help describe or outline the existing conditions of the site and
the proposed development as necessary to supplement the drawing required above shall
also be submitted. This information shall include, but not be limited to, data on existing
covenants, medium intensity soil survey, available Town facilities and utilities, information
describing the development proposal such as number of lots, their principal lots, typical lot
width and depth, playgrounds, park areas and other public areas, proposed protective
covenants, a description of the proposed stormwater drainage plan, proposed utilities and
street improvements.
6.1.3
For any conceptual review requested by an applicant, the application shall include
payment of the application fee as specified in §2.3. Fees for conceptual reviews shall be
paid on a per meeting basis, and are separate from and in addition to fees paid for the
preliminary/final application.
6.2
GENERAL
6.2.1
The Planning Board may require, where it deems it necessary for the protection of public
health, safety, and welfare, that a Minor Site Plan or Minor Subdivision comply with all or
any of the requirements specified for Major Plans.
6.2.2
In Section 6.3 Submissions for Preliminary Plan and Section 6.4 Submissions for Final Plan,
those items marked MAJOR are only required for a Minor Plan upon request by the
Planning Board.
6.2.3
The developer of a Minor Site Plan or Minor Subdivision application may elect to submit
the Preliminary and Final Plans simultaneously. All major plans must go through the two-
step process.
6.3
SUBMISSIONS FOR PRELIMINARY PLAN
A complete Preliminary Plan shall include the following:
6.3.1
Reserved.
6.3.2
A boundary survey of the entire property. The boundary survey shall indicate the
following information:
A.
distances, deflection angles, curve radii, arc lengths, control angles, monument
locations and other necessary survey data;
B.
the names of all abutters, including map and lot numbers;
C.
roads, rights-of-way, and intersections within 50' of the lot;
D.
location and nature of easements of record, deed restrictions, and covenants;
E.
references to deeds, earlier surveys, prior approvals, and other pertinent
information as determined by the surveyor; and
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 23
F.
locus map sufficient to orient the Board as to the location of the property within
the Town.
6.3.3
An existing conditions plan depicting conditions on the property in its pre-application
condition, which at a minimum shall include the following information:
A.
Physical environment on the property, including:
1.
size and road frontage of the property;
2.
elevation contours at 2' intervals referenced to NAVD of 1988;
3.
surface waters and wetlands;
4.
vegetation in general, specifically noting any trees larger than 24" in
diameter at breast height;
5.
ledge outcroppings;
6.
land deemed not suitable for development per §7.4.1;
7.
areas with a high water table or seasonal high water table as defined in
§7.4.2;
8.
a description of stormwater effecting the property that originates from
abutting properties and by what means the stormwater is conveyed,
whether by streams, swales, culverts or other sources; and
9.
a description of existing drainage conditions on abutting downstream
lots.
B.
Existing development and improvements on the property, including buildings,
wells, septic systems, water lines, sewer lines, drainage facilities, utilities,
driveways, parking lots, sidewalks, stone walls, fences, cemeteries, and other such
improvements, with description of uses and sizes as applicable.
C.
The approximate location of property boundaries, buildings, wells, septic systems,
wetlands, surface waters, driveways, roads and intersections within 100' of the
property.
D.
Regulatory constraints affecting the property, including:
1.
Town boundaries;
2.
base zoning districts, and boundaries if applicable;
3.
overlay zoning districts and boundaries, as applicable;
4.
regulatory boundaries from other Town, state or federal laws, including
but not limited to the Floodplain Management Ordinance, Well
Ordinance, and Wireless Communications Facilities Ordinance; and
5.
setback requirements applicable to the property.
6.3.4
The location of all natural features or site elements to be preserved shall be depicted on
the plan.
6.3.5
Impact Statements - The developer shall submit an impact statement which describes the
impact of the proposed development on the community as a whole, and specifically on
the following areas:
a.
water supply for domestic consumption;
b.
water supply for fire protection;
c.
wastewater treatment and disposal;
d.
police, fire and ambulance services;
e.
stormwater management, with particular attention to watersheds that
experience flooding at this time, with reference to culverts, streets, swales and
retention areas;
f.
transportation systems, focusing especially on anticipated traffic impacts on the
street network near the project;
g.
on-site parking, and potential for off-site parking impacts;
h.
water quality;
i.
environmental quality;
j.
historic and archeological resources;
k.
anticipated fiscal impacts on the Town and district capital and operating budgets;
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 24
l.
scale of the project in terms of the expected number of residents, number of
employees, size of buildings, and amount of impervious surface;
m.
for applications with residential uses, address impacts on public school
enrollment and bussing; and
n.
for applications with residential uses, address impacts on public recreation
facilities and services.
The information provided shall be utilized by the Board to evaluate the need for off-site
improvements and impact mitigation by the applicant.
6.3.6
A plan showing the proposed development, showing the general arrangement of streets,
lots, parking lots, buildings, storm water drainage systems, utilities and similar features.
6.3.7
A grading and landscape design plan which meets the requirements of §7.3.
6.3.8
A copy of the Initial Assessment of traffic impacts, where required per Zoning Article 15-A,
and documentation this has been submitted to the Public Works Director for review.
6.3.9
A copy of the most recent deed for the property, and the source deed if the current deed
differs from the source deed.
6.3.10
Proof of ownership or if the developer is not the owner of the property, evidence of the
developer's right, title or interest to the property shall be submitted.
6.3.11
A copy of all easements, rights-of-way, or other encumbrances currently affecting the
property shall be submitted.
6.3.12
Phosphorous Pollution. Where a proposed development is located within the watershed
of a great pond, the applicant shall provide information required to assess compliance
with §1.2.18 and §7.27.
6.3.13
Scenic Resources. Provide information to identify any scenic resources identified and
recommended for protection in the Comprehensive Plan, as addressed in §1.2.8 and
§7.28.
6.3.14
Regarding historic and archaeological resources, the following information shall be
provided:
A.
The applicant shall identify any of the following on the property or within 500' of
the property:
1.
Local Historic Districts or Landmarks;
2.
National Historic Districts;
3.
Properties listed on the National Register of Historic Places; and
4.
Cemeteries or family burial plots.
B.
The application shall include written documentation from the York Historic
District Commission (HDC) regarding the presence of any known or suspected
historic resources on the property, and on the potential impact of this project on
any resources identified in §6.3.14.A (above). The application shall include
written documentation from the Maine Historic Preservation Commission (MHPC)
regarding the presence of any known or suspected archaeological resources on
the property, and on the potential impact of this project on any resources
identified in §6.3.14.A (above). In the event historic or archaeological resources
are or may be located on the property, the application shall be accompanied by
an analysis from a qualified expert that describes the resources, outlines the
significance of the resources, and provides options for the conservation of the
resources.
6.3.15
Provide a map of sufficient scale to identify the location of the applicant's property with
respect to watersheds in the Town. A map of the 8 major watersheds is found in the
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 25
Natural Resources Chapter of the Inventory & Analysis Section of the Comprehensive Plan,
and this may be used as a base.
6.3.16
Identify the location of the applicant's property with respect to Undeveloped Habitat
Blocks, High Value Plant and Animal Habitats, and Focus Areas of Ecological Significance
as mapped by the Maine Department of Inland Fisheries and Wildlife's Beginning With
Habitat program. Where the property is found to be located within an Undeveloped
Habitat Block of 500+ acres, coincides with any habitat identified on the High Value Plant
and Animal Habitats map, or falls within the Mount Agamenticus or Greater Brave Boat
Harbor/Gerrish Island focus areas, the application shall include an analysis of the property
and the proposed development. This shall be prepared by a wildlife biologist with work
experience in this region. The analysis shall be based on research of existing data and site
visits made during the appropriate season(s). The report shall include recommendations
with respect to the design of the development proposal in order to maximize the habitat
values following development. This may include alteration of the on-site design to
minimize off-site habitat impacts, such as but not limited to protecting a corridor which
allows wildlife passage between undeveloped habitat blocks.
6.3.17
The locations, widths and names of any existing, filed or proposed streets or rights-of-way
which are adjacent to the parcel or will be used as access to/from the development shall
appear on the plan. There should also be a notation on the plan as to the status (i.e.,
Town road, private road, paper road) of every street that will be a regular travel way for
traffic to/from the proposed development.
6.3.18
Reserved.
6.3.19
The proposed lot lines with approximate dimensions and approximate area of net
developable acreage shall appear on the plan.
6.3.20
All parcels of land proposed to be dedicated to public use shall be depicted on the plan.
An outline of the conditions of such dedication and provisions for maintenance and/or
management must also be submitted.
6.3.21
Reserved.
6.3.22
If any portion of the Site Plan or Subdivision Plan is in a flood-prone area, the boundaries
of any flood hazard areas and the 100-year flood elevation shall be delineated on the plan
as determined through hydrological determinations. Determinations of flood-prone or
flood hazard areas shall be in accordance with information provided by the Federal
Emergency Management Agency.
6.3.23
Reserved
6.3.24
Indication of the type of sewage disposal to be used in the subdivision shall appear on the
plan.
6.3.24.1
Public Sewage Disposal - When sewage disposal is to be accomplished
by connection to the public sewer, a written statement from the Sewer
District stating that the District has the capability to collect and treat the
wastewater shall be submitted.
6.3.24.2
Private Sewage Disposal - When sewage disposal is to be accomplished
by subsurface wastewater disposal systems, test pit analyses, prepared
by a Licensed Site Evaluator shall be provided. The location of all test
pits dug on the site (whether passing or not) shall be shown on the Site
Plan or Subdivision Plan. The developer must submit evidence that the
Local Plumbing Inspector has reviewed and approved the test pit log
sheets (State of Maine form HHE-200) and septic system design for
compliance with the State of Maine Subsurface Wastewater Disposal
Rules (Chapter 241) and any local plumbing or subsurface wastewater
disposal ordinance of the Town.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 26
6.3.24.3
For subdivisions, a minimum of one acceptable test pit must be shown
on each proposed lot, and two may be required per Article 7.9.2.1.
6.3.25
Indication of the type of water supply system(s) to be used in the proposed development
shall appear on the plan.
6.3.25.1
Public Water - When water is to be supplied by public water supply, a
written statement from the servicing water district shall be submitted
indicating that there will be adequate supply and pressure for the
subdivision for domestic purposes.
6.3.25.2
Wells - The required protective radius shall be delineated around each
well.
6.3.26
A letter from the Fire Chief is required. This letter shall indicate the fire safety concerns
that the applicant must address prior to acceptance of the Final Plan. The Chief shall have
broad latitude to address issues, including but not limited to provision of infrastructure
(hydrants, fire ponds, etc.) design of the site (fire lanes, etc.), or sufficiency of existing
department equipment to protect public safety.
6.3.27
A sketch and narrative description prepared by a professional engineer, of the proposed
stormwater drainage plan shall be submitted. This discussion shall contain a description of
the measures to be taken to control stormwater leaving the property and a description of
the expected total run-off being detained and leaving the site. This submission shall also
indicate whether the drainage system will be underground or above ground, and shall
include an indication of any swales, underground piping, detention structures, etc.
proposed to be used to contain or direct stormwater. The capacity of abutting
downstream properties to manage a 100 year storm shall be addressed by the applicant.
6.3.28
The location and size of existing and proposed sewers and water mains, culverts, bridges
and drainage ways on or adjacent to the property to be developed shall appear on the
plan.
6.3.29
Temporary markers adequate to enable staff or the Board to locate readily and appraise
the basic layout in the field shall be placed on the site.
6.3.30
Sight distances for all new streets including driveways for commercial establishments shall
be depicted on the plan. Whenever there is potential for an insufficient sight distance for
a single-family residential driveway, the location of the driveway and the sight distance
must appear on the plan.
6.3.31
Reserved.
6.3.32
A high intensity soil survey signed and sealed by a Maine Certified Soil Scientist, indicting
the suitability of soil conditions for the uses proposed shall be submitted. This report must
meet the Maine Association of Professional Soil Scientists Standards for Soil Surveys for a
Class A Soil Survey (04/04/89 and as amended). The HISS plan shall indicate areas subject
to the requirements of Article 7.4.2.
6.3.33
For Site Plans or Subdivision Plans involving 40 or more parking spaces or projected to
generate more than 400 vehicle trips per day, a traffic impact analysis, prepared by a
Registered Professional Engineer with at least 3 years experience in traffic engineering,
shall be submitted. The analysis shall indicate the expected average daily vehicular trips,
peak hour volumes, access conditions at the site, distribution of traffic, types of vehicles
expected, effect upon the level of service of the street giving access to the site and
neighboring streets which may be affected, and recommended improvements to maintain
the required level of service on the affected streets. Trip generation rates used shall be the
mean value reported in Table 3 of Development and Application of Trip Generation Rates,
Kellerco, Inc. published by the Federal Highway Administration, January, 1985. (MAJOR)
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 27
6.3.34
All requests for waivers from strict compliance with any of these regulations shall be
submitted in writing. All such waiver requests must refer to the section of these
regulations for which the waiver is being requested, and an explanation of the reasons
such waiver is considered necessary.
6.3.35
The Planning Board review fee, based on the fee schedule in Section 2.3.1 shall be
submitted.
6.4
SUBMISSIONS FOR FINAL PLAN
A complete Final Plan shall include the following:
6.4.1
All information presented on the Preliminary Plan and any amendments or conditions
requested or required by the Board must appear on the Final Plan.
6.4.2
An internal survey of the proposed development showing bearings and distances for all
lot lines, and the precise area of net developable acreage shall be submitted.
6.4.3
The water supply system design contained in the Site Plan or Subdivision Plan shall be
approved in writing by the appropriate agency or individual, and shall be submitted with
the Final Plan.
6.4.3.1 Public Water Supply - The servicing Water District must approve in writing all
specifications for water supply system that appear on the plan.
6.4.3.2 Private Wells - The required protective radius shall be delineated around each
well. Restrictions pertaining to the well protection area shall be indicated on the
plan.
6.4.3.3 Central Water Supply - The State of Maine Department of Human Services must
approve all proposals for a central water supply system, and the written approval
of that agency shall be submitted.
6.4.4
The sewage disposal system design contained in the Site Plan or Subdivision Plan shall be
properly endorsed and approved in writing by the appropriate agency, as listed below.
6.4.4.1 Public Sewage Disposal - The York Sewer District must approve all plans that will
connect to the public sewer line and all sewer line extensions. This approval will
cover issues of capacity as well as piping and pump station specifications.
6.4.4.2 Private Sewage Disposal - Areas designated for primary and back-up septic
system locations per Section 7.9.2.1 shall be precisely delineated, located, and
labeled on the plan. The restriction on uses in these areas shall be documented
in a note on the plan.
6.4.4.3 Engineered Septic Systems - For any system having a capacity of 2,000 gallons
per day or more, the system design must be submitted, and the Local Plumbing
Inspector (LPI) must verify in writing that the system is in compliance with all local
codes. Additionally, written approval of the Maine Department of Human
Services must be submitted.
6.4.5
The developer shall submit dated evidence that they have submitted copies of the
approved Preliminary Plan and any other relevant materials to the Superintendent of
Public Works, School Superintendent (residential development only), Police Chief and Fire
Chief (Beach or Village, as appropriate). This shall include information on the number of
dwelling units proposed, the length of roadways, the size and construction characteristics
of any multi-family, commercial or industrial buildings, and other relevant information.
The applicant shall request that these officials submit an advisory opinion within 30 days.
Such advisory opinions shall be based on the department's ability to service the proposed
development.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 28
6.4.6
A landscaping plan meeting the standards of Section 7.17 as well as all of the Ordinances
of the Town of York shall be submitted. This submission shall include identification of
species to be used, the size of the planting to be used, and the plan spacing being
proposed. On wooded sites, the Plan shall indicate the area where clearing for lawns and
structures shall be permitted.
6.4.7
A plan illustrating the location and dimensions of all proposed development
improvements and alterations including the limits of the areas that will be disturbed
during construction.
6.4.8
Reserved.
6.4.9
The plan shall contain sufficient data to allow the location, bearing and length of every
street, lot line, and boundary line to be readily determined and be reproduced upon the
ground. These lines shall be tied to reference points previously established. The length of
all straight lines, the deflection angles radii, length of curves and central angles of curves,
tangent distances and tangent bearings for each street shall be included.
6.4.10
By proper designation, all public open space for which offers of cession are made by the
developer and those spaces to which title is reserved by the developer, or areas which are
to be commonly held by a condominium or owner's association shall be noted on the
plan.
6.4.11
Written offers of cession to the municipality of all public open space shown on the Plan,
and copies of agreements or other documents showing the manner in which those areas
to which title is reserved by the developer, or to which title is to be held commonly by an
owner's association are to be maintained, shall be submitted.
6.4.12
Written evidence that the municipal officers are satisfied with the legal sufficiency of the
document referred to in Section 6.4.11 shall be submitted. Such written evidence shall not
constitute an acceptance by the Town of any public open space referred to in Section
6.4.11.
6.4.13
The locations permanent reference monuments shall appear on the Final Plan.
6.4.14
The Plan shall contain detailed drawings showing the specifications for the street and
storm drainage design. The information submitted shall include the following:
6.4.14.1
Plan view of all proposed roadways including all existing streets within
300 feet of any proposed intersections.
6.4.14.2
Cross sections of streets every 50 feet along the entire street proposed in
the development.
6.4.14.3
A longitudinal profile along the roadway center line.
6.4.14.4
Date, scale and magnetic or true north point on all plan pages.
6.4.14.5
Roadway and right-of-way limits including edge of pavement, edge of
shoulder, sidewalks and curbs.
6.4.14.6
Type, size, location, material, profile and cross-section of all existing and
proposed drainage structures and their location with respect to the
existing natural waterways and proposed drainage ways.
6.4.14.7
Complete curve data shall be indicated for all horizontal and vertical
curves.
6.4.14.8
Turning radii at all intersections.
6.4.14.9
Centerline gradients.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 29
6.4.14.10
Locations of all existing and proposed overhead and underground
utilities, including but not limited to water, sewer, fire hydrants or dry
hydrants, street lights, electricity, telephone, lighting, and cable
television.
6.4.14.11
The anticipated beginning and end dates of each major phase of street
construction.
6.4.14.12
The street numbers of the lots, laid out in accordance with the street
plan of the Town of York.
6.4.14.13
The location of all street name signs and traffic signs that will be installed
at the expense of the developer.
6.4.14.14
The location and design of all driveways (that portion within the right-of-
way only), and related plan notes, to reflect the requirements of §9.5.12.
6.4.15
Soil Erosion and Sedimentation Control Plan. The Soil Erosion and Sedimentation Control
Plan, which has been prepared by a Qualified Erosion and Sedimentation Control
Professional, shall contain detailed drawings illustrating erosion and sedimentation control
Best Management Practices (BMP) and details meeting the standards in Section 9.10
which are suitable and specific to the site and the development proposed. The Soil Erosion
and Sedimentation Control Plan must include the following items:
6.4.15.1
The limits of areas which will be disturbed by construction, on the same
plan where topographic lines, proposed buildings, structures, roads, and
existing surface waters and wetlands are shown including a note that
the limits of disturbance will be visually delineated in the field prior to
disturbance,
and
that
a
preconstruction
meeting
with
Code
Enforcement is required.
6.4.15.2
The location of all permanent and temporary Erosion and Sedimentation
Controls Best Management Practices proposed to be used including but
not limited to buffer strips, grassed and riprapped ditches, hay bale
barriers, stone check dams, silt fencing, excavation dewatering areas,
concrete washout areas, waste storage, and/or sedimentation basins.
6.4.15.3
Erosion control notes which specify temporary and permanent
stabilization measures for exposed soil, including types and application
rates for all seeding, lime, fertilizer and mulch.
6.4.15.4
A schedule and procedure for installation, inspections by the
contractor, and maintenance. This schedule will outline the erosion
control and construction sequence, final seeding dates, maximum time
period after completion of work that the site will remain unstabilized,
and frequency of erosion control and sedimentation control
maintenance.
6.4.15.5
Details for all permanent and temporary Erosion and Sedimentation
Control Best Management Practices.
6.4.16
Stormwater Management Plan - The developer shall submit a plan and design for the
collection and management of surface drainage waters prepared by a Registered
Engineer, and which meets all the requirements of Sections 9.8 and 9.9.
6.4.16.1
The drainage plan shall include sufficient detail to insure that the
drainage system proposed by the engineer will be properly constructed
in the field and to allow technical evaluation of its adequacy. This shall
include drainage calculations, delineation of drainage area and sub-area
boundaries, all man-made and natural drainage ways, locations of all
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 30
existing and proposed culverts and/or underground piping, culvert and
piping sizes, cross sections of all existing and proposed drainage
structures, downgrade and slide slopes, lining material (i.e. vegetation,
fabric, riprap, etc.) and other dimensional characteristics necessary for
construction and evaluation.
6.4.16.2
The developer must submit a statement from a Professional Engineer
which describes the measures taken for control of erosion, drainage, and
sedimentation and which certifies that the proposed development will
not create erosion, ponding, or flooding, either within the development
or on other properties, as well as the calculations that support this
conclusion.
6.4.16.3
The
developer
must
submit
a
Post
Construction
Stormwater
Management Plan in accordance with the Post Construction Stormwater
Management Plan Ordinance.
6.4.17
A hydrogeologic assessment must be submitted when the Site Plan or Subdivision Plan is
not served by public sewer and; a) any part of the site is located over a sand and gravel
aquifer, as shown on a map entitled "Hydrogeologic Data for Significant Sand and Gravel
Aquifers", by the Maine Geological Survey, Map Numbers 1 and 2; or b) the site has an
average density of less than 100,000 square feet per dwelling unit, or c) when the
Planning Board, after consultation with the Town Engineer, determines such information
is necessary to adequately evaluate the impact on ground or surface waters. The
hydrogeologic assessment shall be prepared by a Maine Certified Geologist or Maine-
licensed Professional Engineer, provided that the professional has at least three years
experience in hydrogeology and shall meet the standards of both this Section and Section
7.16. (MAJOR)
6.4.17.1
A high intensity soil survey map meeting the standards of Article 6.3.32.
6.4.17.2
The depth to the water table at representative points throughout the
subdivision.
6.4.17.3
Drainage conditions throughout the subdivision.
6.4.17.4
Data on the existing ground water quality, either from test wells in the
subdivision or from existing wells on neighboring properties.
6.4.17.5
An analysis and evaluation of the effect of the proposed development
on ground water resources. In the case of residential developments, the
evaluation shall, at a minimum, include a projection of post development
nitrate-nitrogen concentrations at any wells within the subdivision, at
the subdivision boundaries and at a distance of 1,000 feet from potential
contamination sources, whichever is the shorter distance. For
developments within the watershed of a lake, projections of the
development's impact on ground water phosphate concentrations shall
also be provided.
6.4.17.6
A map showing the location of any subsurface wastewater disposal
systems and any existing or proposed drinking water wells within the
development and within 200 feet of the development boundaries.
6.4.18
A list of construction items with cost estimates for all public improvements proposed by
the developer shall be submitted. This shall include, but not be limited to: a) streets; b)
drainage facilities; c) sewer and water mains; d) erosion and sedimentation control plans;
e) recreational areas and parks. This submission shall include a critical path method
construction schedule, cost estimates for each major phase of construction taking into
account inflation, provisions for inspections of each phase of construction, and a
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 31
completion date after which the developer will be in default and the Town shall have the
option to access the funds in the performance guarantee to finish construction.
6.4.19
A copy of covenants and deed restrictions as are intended to cover all or part of the tract
shall be submitted.
6.4.20
The Final Plan shall show 2-foot contour lines of both existing and proposed topography
in relation to the NAVD of 1988.
6.4.21
To aid the Board's understanding of a development, elevation view drawings may
accompany the proposal.
6.4.22
The plot plan must be prepared with a signature block for the signatures of the Planning
Board upon approval. This page will be filed by the developer in the Registry of Deeds. If
necessary, more than one page will be signed by the Board and filed at the Registry.
6.4.23
All requests for waivers from strict compliance with any of these regulations shall be
submitted in writing. All such waiver requests must refer to the section of these
Regulations for which the waiver is being requested, and shall contain an explanation of
the reasons such waiver is considered necessary and why the granting of such a waiver
would be consistent with these Regulations.
6.4.24
Elevation drawings for each side of each non-residential building if the building is either
new or is to be altered pursuant to this application.
6.4.25
Identification of the type and amount of the required performance guarantee.
6.4.26
The Board shall require submittal of all information necessary to determine compliance
with other codes. This includes, but is not limited to: Zoning Ordinance, including overlay
districts:
Floodplain
Management
Ordinance;
Well
Ordinance;
and
Wireless
Communications Facilities Ordinance. In addition, the Planning Board may require any
additional information the Board feels is reasonably necessary to insure that the health,
safety and welfare of the public is protected.
6.4.27
Findings of Fact, Conclusions of Law, and Decisions. The applicant shall prepare a written
draft of a document entitled, "Findings of Fact, Conclusions of Law, and Decisions," for the
Planning Board to consider. This document, in combination with the plan set, explains in
detail the application, the issues considered, and the decisions made. The purpose of this
document is to make the public record crystal clear to ensure that decisions of the Board
are easily understood and defensible in case of appeal. If the applicant cuts corners with
this documentation, it runs the risk of being granted an approval that is easily overturned
on appeal. When making its final decision, the Board shall direct the applicant to amend
the draft as necessary, and a final copy for the Chair's signature shall be delivered along
with the mylars submitted for the Board members' signatures.
A.
The document shall begin with a header in the following format:
Findings of Fact, Conclusions of Law, & Decisions
Planning Board, Town of York, Maine
<date>
Regarding an application by
<applicant>
Tax Map __/Lot __
<street address>
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 32
B.
The document shall provide a compilation of relevant facts pertaining to the
application in a section titled Findings of Fact. At a minimum, this shall include
the following subject matter and order:
1.
street address of the property or properties;
2.
property ownership, as indicated on the application form and deed;
3.
other parties to the application;
4.
description of the existing use or uses of the property;
5.
description of the proposed use or uses of the property, and the nature
of the application;
6.
base zoning district in which the property is located;
7.
overlay zoning district(s) in which the property is wholly or partially
located;
8.
other relevant regulatory districts in which the property is wholly or
partially located (relating to the Floodplain Management Ordinance,
Wireless Communications Ordinance, Well Ordinance, etc.);
9.
comprehensive list of materials submitted by the applicant as part of the
application;
10.
date or dates on which the Board met to consider the application;
11.
date or dates on which the Board conducted a public hearing on the
application; and
12.
a brief description of the substantive materials and testimony received at
the public hearing.
C.
The document shall provide a compilation of legal findings pertaining to the
application in a section titled Conclusions of Law. At a minimum, this shall
include the following subject matter and order:
1.
Description of the Planning Board's jurisdiction over the application. List
all statutes, ordinances, and regulations that are applicable, and which
permits and approvals are required. For instance, the Zoning Ordinance
is almost always applicable, but not all applications require a Wetland
Permit.
2.
For each applicable land use code or permit, explain how the proposal
complies with each of the relevant requirements of each of the relevant
land use codes. Many permits have a list of required criteria of approval
which can form the basis for this requirement. (See, for example, §1.2 of
this Regulation. Each difficult or questionable issue should be detailed to
ensure the final decision is defensible. The more contentious the
application, and the more difficult the decisions, the more detail is
important.)
D.
The document shall provide a list of decisions made by the Planning Board
regarding the application, to be documented in a section titled Decisions. At a
minimum, this shall include the following subject matter and order:
1.
The date on which the application was reviewed and found by a vote of
the Board to be substantively complete and was accepted for review.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 33
2.
A list of each waiver granted, specifying the exact section waived, the
date of each decision, and the rationale for each waiver.
3.
A list of each decision on which the Board voted during the review
process which relates to interpretation or application of the codes.
4.
The date on which the application received preliminary approval, if
required, along with a description of direction provided to the applicant
for changes required at final submittal.
5.
The date on which the application received final approval, along with a
listing of all conditions precedent or subsequent imposed by the Board
6.
The date on which a conditional final approval will expire if the
conditions precedent are not satisfied.
E.
At the end of the document, there shall be a place for the Chair of the Board to
sign and date the document.
6.4.28. Financial Capacity. The applicant shall provide documentation from a bank or other
established financial institution acceptable to the Planning Board with an evaluation as to
the applicant's financial capacity to successfully undertaken and complete the proposed
project.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 34
ARTICLE 7 ... GENERAL STANDARDS
7.1
In reviewing applications, the Board shall consider the following general standards and making
findings that each has been met prior to the approval of a Final Plan. In all instances the burden of
proof shall be upon the applicant.
7.2
CONFORMANCE WITH COMPREHENSIVE PLAN.
All proposed Site Plans and Subdivision Plans shall conform to the Comprehensive Plan of the Town
of York and with the provisions of all pertinent federal, state, and local codes, ordinances, and
regulations.
7.3
PRESERVATION OF NATURAL AND HISTORIC FEATURES
7.3.1
The Board shall require that a proposed Site Plan or Subdivision Design include a grading
and landscape design plan that shows the preservation of existing trees (6" diameter or
larger at 4 feet 6 inches), the replacement of trees and vegetation, existing and final
contours, streams and the preservation of scenic, geologic, historic or environmentally
desirable areas. Significant trees or stands of trees, and species or clumps of trees that are
rare to the area or of particular horticultural or landscape value shall be preserved.
Likewise, geologic rock outcroppings significant to the area and landscape shall be
preserved. The street and lot layout shall be adapted to the topography. Extensive
grading and filling shall be avoided as far as possible.
A.
To ensure the Board understands the extent of protection or proposed alteration of
the site landforms and landscaping, the following shall be clearly documented on
the plans:
1. the net volume of all materials in cuts and fills, and the net volume of all materials
brought in to or removed from the development site for changes including but
not limited to foundations (other than building foundations), driveways, septic
systems, drainage systems, and roads;
2. identification of all areas where elevations change more than 5 feet; and
3. the extent and volume of all grading work proposed outside the road right-of-
way which is related to road construction and driveways.
B.
All proposed grading changes which affect bufferyards shall be designed to preserve
and protect existing trees and natural landscaping and geological features within the
buffer.
C.
Except under building footprints, changes in pre- and post-development ground
elevation which exceed 10 feet may be permitted by the Board only when the
applicant demonstrates why the change is necessary and provides an analysis to
ensure there are no adverse impacts as a result.
D.
New slopes established by re-grading a site shall not exceed 20%, except for the
allowed 33% shoulder slope along proposed roads.
E.
To the maximum extent possible, roads and driveways shall follow landform
contours and minimize deep cuts.
F.
The Board shall require the applicant to show a grading design which preserves the
natural landform and the application shall minimize the total landform disturbance.
7.3.2
The Planning Board may require the preservation of certain other natural characteristics,
for example, that trees along northerly borders are retained to provide a natural wind
buffer.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 35
7.3.3
The plan shall, by notes on the final plan and deed restrictions, limit the clearing of trees to
those areas designated on the plan.
7.3.4
The project shall be designed to maximize the habitat values of the property following
development. This shall be based on the information presented in the report of the
wildlife biologist as submitted per §6.3.16, and additional sources as the Board may find
relevant.
7.3.5
Any public rights of access to the shoreline of a water body shall be maintained by means
of easements or rights-of-way, or should be included in the open space, with provisions
made for continued public access.
7.3.6
With respect to historic and/or archaeological resources, the Planning Board shall act to
protect such resources.
A.
Where initial information indicates there may be significant resources on the site,
the Board may require a comprehensive site analysis by a qualified professional.
This shall be paid for by the applicant.
B.
The Board may require alteration of the proposed design and/or permanent
protection of identified resources. It shall consider the information provided by
the applicant, and may seek advice from the Historic District Commission, Maine
Historic Preservation Commission, or other qualified sources. The Board shall
weigh the relative significance of resources affected and the magnitude of impact
on the proposed development in making its decision.
C.
The Board may require a plan note to address any archaeological findings
discovered during site construction, as follows:
Archeological Findings. If, during excavations, any archeological
findings are uncovered, all work shall stop and the State Archeologist be
consulted, and may commence again only after conservation of the
resources is addressed to the satisfaction of the State Archeologist.
7.4
LAND NOT SUITABLE FOR DEVELOPMENT
7.4.1
The board shall not include in the calculation of lot size and portion of the land that:
7.4.1.1 Is at a lower elevation than the normal high water mark of any body of water
that is situated below sea level.
7.4.1.2 Is located within the 100 year frequency floodplain as identified by the Federal
Emergency Management Agency or the Department of Housing and Urban
Development, Flood Insurance Administration, unless the developer shows proof
through the submittal of materials prepared by a Registered Land Surveyor which
show that the property in question lies at least two feet above the 100 year flood
level (elevation not to include filled or made land).
7.4.1.3 Is part of a right-of-way or easement of passage of any width, or is part of a utility
easement greater than 90 feet wide.
7.4.1.4 Is defined by federal, state, or Town of York law, regulations or ordinances as
being wetlands.
7.4.1.5 Has a slope greater than 20%.
7.4.2
Whenever the high intensity soils survey reveals areas with a high water table, or
seasonally high water table (within 10 inches of surface for at least 3 months of the year),
these areas shall be depicted on the Plan. Additionally, a note shall be added to the plan
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 36
instructing future landowners that any construction in these areas may require special
construction practices.
7.5
BLOCKS
7.5.1
Where street lengths exceed 1,000 feet between intersections with other streets, the
Board may require a utility/pedestrian easement, at least 20 feet in width, to provide for
underground utility crossings and/or a pedestrian pathway of at least five feet in width.
Maintenance obligations shall be included in the written description of the easement, and
shall be so noted on the plan.
7.6
LOTS
7.6.1
All lots shall meet the minimum requirements of the Zoning Ordinance for the zoning
district in which they are located. The lot size, width, depth, shape and orientation and
the minimum building setback lines shall be appropriate for the location and type of
development and use contemplated. Land that is not suitable for construction as
delineated in Section 7.4 shall not be included in the calculation of the lot area.
Additionally, portions of land with a seasonally high water table may not comprise more
than 25% of any lot under 1/2 acre, or more than 50% of any lot over 1/2 acre.
7.6.2
Lot configuration and area shall be designed to provide for adequate off-street parking
and service facilities based upon the type of development contemplated.
7.6.3
Lots with multiple frontages shall be avoided wherever possible. When lots do have
frontage on two or more streets, the Planning Board shall determine proper egress and
ingress to maximize safety. Both the plan and deed shall contain restrictions indicating the
location for vehicular access.
7.6.4
Side lot lines shall be substantially perpendicular to the street.
7.6.5
Where a tract is subdivided into lots substantially larger than the minimum size required in
the Zoning District in which a subdivision is located, the Board may require that the streets
and lots be laid out in such a manner as to provide for future resubdivision. Where public
utilities could be extended into the subdivision in the foreseeable future, the subdivision
shall be designed to accommodate the extensions of utilities.
7.6.6
If a lot on one side of a "stream or tidal water" 25 feet wide or more (measured between
high water marks), street, or other similar barrier fails to meet the minimum requirement
for lot size, it may not be combined with a lot on the other side of the stream, tidal water,
street or barrier to meet the minimum lot size.
7.6.7
Flag lots and other odd shaped lots in which narrow strips are joined to other parcels in
order to meet minimum lot size requirements are prohibited. The ratio of lot length to
width shall not be more than four to one (4:1).
7.7
UTILITIES
7.7.1
The size, type and location of public utilities, such as street lights, electricity, gas lines, fire
hydrants, etc. shall be shown on the plan.
7.7.2
Utilities shall be installed underground.
7.7.3
Underground utilities shall be installed prior to the installation of the final gravel base of
the street.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 37
7.8
WATER SUPPLY
A water supply system which supplies both domestic water and water for fire-fighting purposes
must be provided.
7.8.1
Public Water Supply System
7.8.1.1 When a Site Plan or Subdivision Plan is to be served by a public water system, the
complete supply system, including fire hydrants, shall be installed at the expense
of the developer. The Board shall require connection to the public water system
if an existing public water system line with adequate supply is within 750 feet of
the site.
7.8.1.2 The developer shall provide a written statement from the servicing water district
that adequate water for both domestic and fire fighting purposes can be
provided without placing an undue burden on the source, treatment facilities or
distribution system involved. The developer shall be responsible for paying the
costs of system improvements necessary to serve the site.
7.8.1.3 The size and location of mains, gate valves, hydrants, and service connections
shall be reviewed and approved in writing by the servicing water district and the
Fire Chief.
7.8.1.4 The property owner(s) shall be responsible for payment of water service costs for
each fire hydrant on private property. In the event that required water charges
are not paid, the Town shall lien each affected property to ensure continued
operation of each hydrant. The Town shall charge each property owner their
respective share of the costs, plus a 25% penalty to help cover administrative
costs. This subsequent condition shall be included in the plan notes on the
signed plan.
7.8.2
Private Water Supply
7.8.2.1 When the location of a proposed development is greater than 750 feet from the
public water system, the Board may allow the use of individual wells or a private
community water system.
7.8.2.2 Dug (shallow) wells shall be permitted only if it is demonstrated to be not
economically feasible to develop other ground water sources, and shall be
constructed so as to prevent infiltration of surface water into the well. Unless
otherwise permitted by the Board, dug wells shall be prohibited.
7.8.2.3 If a central water supply system is provided by the developer, the location and
protection of the source, and the design, construction and operation of the
system shall conform to the standards of the Maine Rules Relating to Drinking
Water (10-144 A.C.M.R. 231).
7.8.2.4 The developer shall construct ponds and dry hydrants to provide for adequate
water storage for firefighting purposes. An easement shall be granted to the
municipality granting access to and maintenance of the dry hydrants where
necessary. The Board may waive the requirement for fire ponds only when the
developer makes arrangements to provide alternate firefighting provisions.
7.8.2.5 The location of all existing and proposed wells shall be shown on the lot.
7.8.2.6 Lot configuration and site design shall provide for a protective radius of 100'
around every well on the property. A larger radius shall be provided if required
by State standards. The well protection area shall be contained entirely on the
lot, or may extend onto adjacent lots if an easement is provided. For subdivisions
with common lands, the easement may extend into the common land. Septic
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 38
systems, backup septic system areas, underground storage tanks, and roads shall
be prohibited in the well protection area.
7.8.2.7 If there is concern about sufficiency of the water quantity or quality available on-
site, or about off-site domestic water quantity or quality impacts caused by the
development, the Board may require the developer to submit documentation
from a qualified professional as to the adequacy of the proposal in these respects.
7.9
SEWAGE DISPOSAL
7.9.1
Public Sewage Disposal System
7.9.1.1 A public sewer system shall be installed at the expense of the developer when
there is a public sewer line capable of servicing the development within 1,500
feet of the proposed development at its nearest point. The Sewer District shall
certify that providing service to the proposed development is within the capacity
of the system's collection and treatment system.
7.9.1.2 The developer shall request a review by the Sewer District of the design and
proposed construction of the sewage system. Approval of the Sewer District in
writing is required prior to Planning Board approval.
7.9.2
Private Sewage Disposal System
7.9.2.1 The applicant shall submit evidence of soil suitability for subsurface sewage
disposal prepared by a Maine Licensed Site Evaluator in full compliance with the
requirements of the State of Maine Subsurface Wastewater Disposal Rules and
the Ordinances of the Town of York. In addition, on lots in which the limiting
factor has been identified as being within 24 inches of the surface, a second site
with suitable soils shall be shown as a reserve area for future replacement of the
disposal area. The reserve area shall be shown on the plan and restricted so as
not to be built upon. All setbacks and other such requirements normally
associated with a septic system shall also be observed for the reserve area.
7.9.2.2 In no instance shall a disposal area be permitted on soils or on a lot which
requires a New System Variance from the Subsurface Wastewater Disposal Rules.
7.9.2.3 Overboard
discharge
systems
which
discharge
treated,
untreated
or
inadequately treated pollutants including, but not limited to, animal or human
waste, into any waterbody or watercourse within or abutting the Town of York
shall not be permitted.
7.10
SURFACE DRAINAGE
7.10.1
The stormwater management plan submitted in accordance with Sections 6.4.16, 9.8 and
9.9 shall be installed.
7.11
LAND FEATURES
7.11.1
Topsoil shall be considered part of the site and shall not be removed from the site except
for surplus topsoil from streets, parking areas and the areas occupied by the proposed
buildings.
7.11.2
Except for normal thinning and landscaping, existing vegetation shall be left intact to
prevent soil erosion and to minimize stormwater run-off. Additionally, all erosion control
and sedimentation provisions in Article 9.10 must be met.
7.11.3
To prevent soil erosion in the shoreline areas, tree cutting in the strip extending one
hundred feet inland from the normal high water mark of any waterbody shall be limited in
accordance with the Town of York's Shoreland Zoning Ordinance and State law. These
restrictions shall appear as a note on the plan and in the deeds to the affected lots.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 39
7.11.4
Site and road layout shall minimize wetland impacts as much as practical based on
assessment of functional values from the wetlands assessment required by the Zoning
Ordinance. The Board can reduce the total number of lots in the subdivision and may
require other design changes to achieve this result.
7.12
DISPOSAL OF CONSTRUCTION WASTE AND DEMOLITION DEBRIS
7.12.1
The developer shall legally dispose of construction and demolition debris, stumps, brush
and wood waste, bituminous asphalt and pavement products, inert fill and wood wastes
and will provide a description of such disposal arrangements on the final plan. These
arrangements must meet all applicable requirements to the Maine Department of
Environmental Protection (DEP) Solid Waste Management Rules, Chapter 404 as
amended. If an on-site disposal area for the disposal of stumps and debris is proposed, the
site shall be indicated on the plan, and shall be suitably covered with fill and topsoil, limed,
fertilized and seeded.
7.13
RETENTION OF PROPOSED PUBLIC SITES AND OPEN SPACES
7.13.1
For conventional design subdivision (not a cluster design subdivision), the Board shall
require the reservation of at least 10% of the gross lot area as open space in order to
provide for the recreational needs of the occupants of the subdivision, to maintain the
scenic or natural beauty of the area, or to manage wildlife habitat. In evaluating the
design of the open space, the Board shall consider the proximity of the subdivision to
neighboring dedicated open space or recreation facilities; the needs identified in the
Comprehensive Plan for open space or recreational facilities in the neighborhood
surrounding the subdivision; the type of development and the demographic
characteristics of potential residents in the subdivision; the wildlife habitat values of the
property; and the density or lot sizes of the development.
7.13.2
Reserved land acceptable to the Board and the developer may be presented to the Town
or other suitable agency as described in Section 7.14 for acceptance. However, approval
of a plan on which reserved land or recreation area is depicted shall not constitute an
acceptance by the municipality or other agency of such areas and the Plan shall contain a
notation to this effect. The Planning Board may, where appropriate, require a written
agreement between the applicant and the Board of Selectmen covering future deed and
title, dedication, equipment, and maintenance of any such recreation area.
7.13.3
Land reserved for open space purposes shall be of a character, configuration and location
suitable for the particular use intended. A site to be used for active recreation purposes,
such as a playground or a play field, should be relatively level and dry, have suitable access
for the proposed uses of the site, and have both a depth and width of at least 200 feet.
7.13.4
Undeveloped open space sites selected primarily for scenic or passive recreation should be
left in their natural state. The plan may specify certain improvements proposed by the
developer such as the cutting of trails for walking or jogging, or provision of picnic areas,
etc. In addition, the Planning Board may require the developer to make other
improvements, such as removing dead or diseased trees, thinning trees or other
vegetation to encourage more desirable growth, grading, and seeding. Sites selected for
these purposes shall have such access as the Board may deem suitable and shall have no
less than 25 feet of street frontage. The configuration of such sites shall be reviewed for
adequacy by the Board with regard to scenic attributes to be preserved, together with
sufficient areas for trails, lookouts, etc. where necessary and appropriate.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 40
7.14
DEDICATION AND MAINTENANCE OF COMMON OPEN SPACE AND SERVICES
All common open space or facilities must be noted on the plan along with appropriate provisions
on the plan to specify the ownership and maintenance of these common properties or facilities.
This may involve any or all of the situations described below:
7.14.1
Common property may be deeded in fee or through use of a conservation easement to an
agency or association defined as a holder under Title 33 M.R.S.A. Section 4476. The
Planning Board must approve of the holder and its adequacy to protect the values for
which the parcel is to be preserved.
7.14.2
All or a portion of the common property or facilities may be proposed for acceptance by
the municipality. If the municipality does not accept them, the common properties and
facilities must become the responsibility of an owner's association pursuant to Section
7.14.3
7.14.3
All or a portion of the common properties may be held in common through means of an
owner's association. The dedication of the proposed owner's association shall specify
maintenance responsibilities and shall be reviewed by the Board. Covenants for
mandatory membership in the homeowner's association setting forth the owners' rights,
interests, financial obligations, and privileges shall be reviewed by the Board and must be
included in the deeds for the affected lots or dwelling units, and shall be so stated on the
plan.
7.14.3.1
The developer shall maintain and operate the common property until
51% of the lots, units, or total constructed space, whichever is
appropriate, has been sold to persons other than the developer, at
which time the responsibility for the maintenance and operation of the
common property may be turned over to the Homeowner's
Association. This section does not apply to required public
improvements for which the developer is responsible until he is
released from the performance guarantee.
7.14.4
Further subdivision of the common land or its use for other than non-commercial
recreation or conservation purposes, except for easements for underground utilities, shall
be prohibited. The use of open space land must continue in perpetuity for the purpose
specified. Structures and buildings accessory to non-commercial recreation or
conservation uses may be erected on the common land. This prohibition shall be noted
on the plan.
7.15
CONSTRUCTION IN FLOOD HAZARD AREAS
When any part of a Site Plan or subdivision is located in a special flood hazard area (Zones A, A1-
A30, AE, AO, AH, V1-V30 and/or VE as identified by the Federal Emergency Management Agency),
the plan shall indicate that all principal structures in the development shall be constructed with
their lowest floor, including the basement, at least two feet above the 100 year flood elevation and
that all other conditions of the Town of York Flood Management Ordinance shall be met. Such a
restriction shall be included in the deed for any lot which is included or partially included in the
flood hazard area.
7.16
IMPACT ON GROUNDWATER
7.16.1
When required through the provisions in Section 6.4.17, the developer shall submit a
groundwater purity hydrogeologic assessment containing the information outlined in
Section 6.4.17 and meeting the following standards so as to prove that here will be no
problems relating to groundwater mounding or groundwater contamination.
7.16.1.1
Projections of groundwater quality shall be based on the assumption of
60% of annual average participation.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 41
7.16.1.2
No Site Plan or Subdivision Plan shall increase any contaminants
concentration in the ground water to more than one half of the State of
Maine Primary Drinking Water Standards. No Site Plan or Subdivision
Plan shall increase any contaminant concentration in the ground water
to more than the State of Maine Secondary Drinking Water Standards.
7.16.1.3
If ground water already contains contaminants in excess of the primary
standards, and the Site Plan or Subdivision Plan is to be served by on-
site ground water supplies, the applicant shall demonstrate how water
quality will be improved or treated.
7.16.1.4
If ground water already contains contaminants in excess of the
secondary standards, the subdivision shall not cause the concentration
of the parameters in question to exceed 150% of the ambient
concentration.
7.16.1.5
Subsurface wastewater disposal systems and drinking water well shall
be constructed as shown on the map submitted with the assessment. If
construction standards for drinking water wells are recommended by
the hydrogeologist's assessment, those standards shall be included as a
note on the Final Plan, and as restrictions in the deeds to the affected
lots.
7.17
LANDSCAPING
7.17.1
In addition to specific landscaping provisions in the Town of York ordinances, street trees,
esplanades, and open green spaces may be required at the discretion of the Planning
Board. Reasonable landscaping should be provided at site entrances, in public areas,
and adjacent to buildings. The type and amount of landscaping required may vary
depending on the type of development. Landscaping materials shall be appropriate for
the local environment, soil conditions, and availability of water.
7.17.2
The site design shall minimize the possibility of noise pollution either from within or
without the development from highway or industrial sources by providing and
maintaining a green shrubbery buffer strip between abutting properties that are so
endangered.
7.17.3
Where landscaping improvements are required, they shall be maintained and replaced
within one growing season if they die. They shall be incorporated into the Final Plan and
be executed by the developer as construction of the development progresses.
7.18
MONUMENTS
7.18.1
Drilled stone or reinforced concrete with inset galvanized steel posts shall be set at all
street intersections and points of curvature, but no further than 750 feet apart along street
lines without curves or intersections.
7.18.2
Drilled stone or reinforced concrete with inset galvanized steel posts shall be set at all
corners and angle points of the site boundaries where the interior angle of the site
boundaries is 135 degrees or less.
7.18.3
Drilled stone or reinforced concrete with inset galvanized steel posts shall be a minimum
of four inches square at the top and four feet in length, and set in the ground at final
grade level. After they are set, drill holes, 1/2 inch deep shall locate the point or points
described above.
7.18.4
All other site boundary corners and angle points, as well as all lot boundary corners and
angle points shall be marked by same monumentation.
7.18.5
Survey monumentation shall be required for conservation easements. Monumentation
shall be sufficient to enable the boundary of the easement to be easily located in the field.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 42
7.18.6
Proper and complete monumentation shall be installed prior to final approval of the
application. The applicant's surveyor shall certify in writing that all monuments have been
installed according to the submitted plan, using the form entitled "Certificate of
Monument Installation." This form must be submitted to the Board prior to the receipt of
final approval of the application. A copy of this form is contained in Appendix B.
7.19
IMPACT MITIGATION
The Planning Board may require the construction of off-site improvements if the Board determines
such improvements are specifically required to address a public health, safety or welfare concern
caused by the proposed project.
7.20
STREET AND STORM DRAINAGE DESIGN, EROSION CONTROL
Street and stormwater drainage design, and erosion control and sedimentation plans shall meet the
standards of Article 9.
7.21
REFUSE DISPOSAL AND RECYCLING
A non-residential use shall provide adequate facilities to collect and dispose of refuse and recycle
solid wastes on a timely basis and in an environmentally friendly manner. All refuse and recycling
facilities shall be screened from view by a four-sided solid enclosure. The fence shall be a minimum
of six feet in height. A wooden stockade fence is preferred; metal wire fence is prohibited as a
screen.
7.22
HAZARDOUS MATERIALS
7.22.1
Explosive Materials. Highly flammable or explosive liquids, solids or gases shall be stored
in a manner that complies with State and Federal regulations, and shall be subject to the
Fire Chief's approval.
7.22.2
Chemical/Fuel Storage. All storage facilities for fuel, chemicals, chemical or industrial
wastes, and potentially harmful raw materials shall be completely screened from view
from streets, shall comply with State and Federal regulations, and shall be subject to the
Fire Chief's approval.
7.23
A.D.A. COMPLIANCE
For all Site Plans, adequate provisions shall be made to ensure compliance with the Americans With
Disabilities Act of 1990 (ADA). The following measures are required as appropriate.
7.23.1
Curb ramps are required as necessary.
7.23.2.
It is recommended, though not required, that a "drop-off" area be located at wheelchair-
accessible entrances.
7.23.3
Where necessary, wheelchair ramps shall be provided, with a slope not exceeding one
foot of rise per 12 feet of run, and a width as required by ADA.
7.23.4
All sites shall provide wheelchair-accessible parking spaces and accompanying access
aisles in accordance with ADA, in particular 23 CFR Part 36, Appendix A, §4.1.2(5) (see
Federal Register, Volume 56, #144, July 26, 1991), or as amended.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 43
a.
For the convenience of readers, the number of accessible spaces required for
smaller parking lots are as follows:
Total Parking Spaces
Minimum Accessible Spaces
1 - 25
1
26 - 50
2
51 - 75
3
76 - 100
4
100 - 150
5
151 - 200
6
201 - 300
7
b.
One in every 8 accessible spaces, but never less than one, shall be designated as
"van accessible". Such spaces shall be served by an 8 foot wide access aisle.
c.
Accessible parking spaces shall be served by a parallel access aisle, which shall be
a minimum of 5 feet wide for standard spaces and 8 feet wide for van accessible
spaces. Adjacent spaces may share an access aisle.
d.
Accessible parking spaces and adjacent access aisles shall be paved flush to the
ground, and the pavement shall extend all the way to the nearest wheelchair-
accessible entrance. Parked vehicle overhangs shall not reduce the clear width of
an accessible route.
e.
Accessible parking spaces shall be located adjacent to wheelchair-accessible
entrances. Wherever practical, the main entrance shall be wheelchair-accessible.
f.
Each accessible space shall be identified with pavement marking and a sign.
Signs shall be mounted such that they are not obscured by other parked vehicles.
Van accessible spaces shall have an additional sign indicating the space is van
accessible.
g.
Accessible parking stalls shall be large enough to fully contain a rectangle 8 feet
wide by 20 feet long.
h.
The slope of accessible parking spaces and adjacent access aisles shall not exceed
a slope in any direction exceeding one foot of rise per 50 feet of run.
7.24
IMPACT ON AIR QUALITY
The proposed development shall not unduly affect air quality. Any required State or Federal
emissions permits shall be obtained prior to final approval.
7.25
STATE PERMITS
Prior to, or as a precedent condition to granting final approval of an application, all required State
permits shall be obtained.
7.26
TRAFFIC IMPACT ON ADJACENT MUNICIPALITIES
If the proposed development crosses municipal boundaries, the Board shall review the application
jointly with Planning Board of the adjacent municipality. The York Planning Board shall require
mitigation or take other action to ensure the proposed development does not cause unreasonable
traffic congestion or unsafe conditions with respect to the use of existing public ways in the
adjoining municipality.
7.27.
PHOSPHOROUS POLLUTION
Where a proposed development is located within the watershed of a great pond, the applicant
shall ensure the long-term cumulative effects of the propose development will not unreasonably
increase a great pond's phosphorous concentration during the construction phase and life of the
proposed development.
7.28
SCENIC RESOURCES
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 44
The Planning Board may require reasonable modification of a proposed development if such
modification will help mitigate adverse impacts on aesthetic, scenic, or natural beauty of the area.
This standard shall be applied only to resources specifically identified and recommended for
protection in the Comprehensive Plan.
7.29
TIMEFRAME FOR CONSTRUCTION. It is in the community's interest to ensure the construction of
roads and site improvements is completed in a timely manner, and/or limited to times that will
minimize public impact. The Board may require the plan to include a plan note that specifies a
maximum duration for completion of roads and/or site improvements. The deadlines shall be
proposed by the applicant. The Board shall review the deadlines, and shall have the authority to
amend the deadlines. Failure to meet the deadline shall be grounds for the Town to use the posted
financial security to complete the work, and this shall be reflected in the language of the financial
security. The Board may also require the plan to include a plan note that restricts the timing of
construction when such limits will prevent undue disturbance or adverse impact to the public or
the neighborhood.
7.30
SUBDIVISION PHASING
The Comprehensive Plan designates both Growth and Rural areas, and in Policy #1.3.1 calls for the
control of subdivision phasing.
A.
Growth Area. The Planning Board may impose phasing limits on a major subdivision
where this is necessary to help mitigate adverse impacts of the subdivision.
B.
Rural Area. The Planning Board shall require phasing of major subdivisions containing 10
or more lots or residential units, as follows:
1.
The scope of the Preliminary Plan shall include all anticipated and potential phases
to demonstrate the anticipated maximum buildout of the subdivision. This will help
the Board understand the scope and potential impacts associated with the project
at buildout.
2.
Not more than one phase shall be permitted per year in each subdivision.
3.
No phase shall contain more than 10 lots or 10 residential units, whichever is more
restrictive.
C.
Standards for All Phased Subdivisions. The following shall apply in all cases. See also
§5.5.5 and §10.7.
1.
The order of construction of phases shall be expressly called out on the Subdivision
Plan in the plan notes.
2.
The timeline for construction of the subdivision as addressed in §5.5.5 shall apply
to the first phase from the initial date of Preliminary Plan approval. This standard
shall apply to each subsequent phase, with the time requirement beginning at
completion of all required infrastructure of the prior phase.
3.
This standard shall be applied to all contiguous lands which are or become under
common ownership during the timeframe in which the subdivision phases are
being constructed, through the date on which the final phase is completed. When
interpreting common ownership, this shall include ownership by different
corporations in which one or more directors and/or shareholders are the same
individual, their spouse, or other family members.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 45
ARTICLE 8 ... ACCESS CONTROL AND TRAFFIC IMPACTS
8.1
GENERAL
8.1.1
Provision shall be made for vehicular access to the development and circulation within the
development in such a manner as to safeguard against hazards to traffic and pedestrians
in existing streets and within the development, to avoid traffic congestion on any street
and to provide safe and convenient circulation on public streets and within subdivisions.
More specifically, access and circulation shall conform to the standards and design criteria
in this Article, as well as Article 9.
8.1.2
The vehicular access to the subdivision shall be arranged to avoid traffic congestion of
existing local residential streets.
8.1.3
Where a lot has frontage on two or more streets, the access to the lot shall be provided
from the street where there is lesser potential for traffic congestion and lesser potential for
hazards to traffic and pedestrians. In general, all new driveways should access from the
new subdivision street, rather than an existing street, so as to minimize curb cuts on the
more heavily traveled street.
8.1.4
The street giving access to the development, and neighboring streets which can be
expected to carry traffic to and from the development, shall have sufficient traffic carrying
capacity and shall be suitably improved by the developer to accommodate the amount
and types of traffic generated by the proposed development. No development shall
increase the volume: capacity ratio of any street above 0.8 nor reduce the street's Level of
Service to "D" or below, as defined by the most recent edition of the Highway Capacity
Manual (published by the Transportation Research Board).
8.1.5
Where necessary to safeguard against hazards to traffic and pedestrians and/or to avoid
traffic congestion, provision shall be made for turning lanes, traffic directional islands,
frontage streets, and traffic controls within public streets. Traffic control devises shall
conform to the most recent edition of the Manual on Uniform Traffic Control Devices
(MUTCD), unless otherwise specified in Subsection 8.4.
8.1.6
Access to the development shall be of a design and have sufficient capacity to avoid
queuing of entering vehicles on any street.
8.1.7
Where topographical and other conditions allow, provisions shall be made for circulation
access connections to adjoining lots of similar existing or potential use. These shall be
required:
8.1.7.1 When such access connection will facilitate fire protection services; or
8.1.7.2 When such access will enable the public to travel between two existing or
potential uses, generally open to the public, without the need to travel upon a
street outside the development.
8.1.8
All non-residential sites shall provide off-street loading facilities sufficient to meet the need
of the use. The loading facility shall be located and designed so that delivery vehicles can
be parked completely on site. The loading area shall not obstruct on-site traffic flow, but
may allow for temporary use or blocking of some on-site parking spaces.
8.1.9
Snow removal shall be reviewed for all sites, and the general plan for snow removal shall
be indicated on the plan. Areas suitable for snow storage shall be designated on the plan,
and removal of snow from the site may be required if insufficient storage is provided. The
landscaping and snow removal plans must work in harmony with on another.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 46
8.2
SITE PLAN DRIVEWAY DESIGN STANDARDS
8.2.1
The design standards of this Section shall apply to all new or modified driveways subject to
Site Plan review. Further, the Board may require compliance with these standards when a
site is being expanded or redeveloped and, in the opinion of the Board, there is concern
about the adequacy of the existing access.
8.2.2
Access design shall be based on the estimated volume using the access classification
defined below.
Low Volume Access
Less than 25 vehicle trips per day
Medium Volume Access
Any access that is not a low volume or a high volume access.
High Volume Access
Peak hour volume of 400 vehicles or greater
8.2.3
Sight Distances - Accesses shall be designed in profile and grading and shall be located to
provide the required sight distance measured along the street in each direction. Sight
distances shall be measured from the driver's seat of a vehicle standing on that portion of
the exit with the front of the vehicle a minimum of 10 feet behind the curb line or edge of
shoulder, with the height of the eye 3 ½ feet, to the top of an object 4 ¼ feet above the
pavement. A sight distance of ten feet for each mile per hour of posted speed limit shall
be maintained or provided.
Where necessary, corner lots shall be cleared of all growth and sight obstructions,
including ground excavation, to achieve the required visibility.
8.2.4
Vertical Alignment - Accesses shall be flat enough to prevent the dragging of any vehicle
undercarriage. Accesses shall have vertical of alignments which conform to current Maine
Department of Transportation driveway standards. In addition, low volume accesses shall
not have, at any point, a slope greater than 15%, and medium and high volume accesses
shall not have, at any point, a slope greater than 8%.
8.2.5
Low Volume Accesses
8.2.5.1 Angle of Intersection - Low volume accesses shall be two-way operation and shall
intersect the street at an angle as nearly equaling 90 degrees as site conditions
permit. Under special site conditions, the Planning Board may waive this
requirement to no less than 70 degrees.
8.2.5.2 Curb Radius - The curb radius shall be no less than 5 feet and no more than 15
feet.
8.2.5.3 Access Width - The width of the access shall be no less than 12 feet and no more
than 20 feet.
8.2.6
Medium Volume Accesses
8.2.6.1 Angle of Intersection - Medium volume accesses may be either one-way or two-
way operation and shall intersect the street at an angle as nearly equaling 90
degrees as site conditions permit. Under special site conditions, the Planning
Board may waive this requirement to no less than 70 degrees.
8.2.6.2 Curb Radius - Curb radius will vary depending on whether the access is one-way
or two-way operation. On a two-way access the curb radii shall be no less than
15 feet and no more than 30 feet. One one-way accesses, the curb radii shall be
no less than 15 and no more than 30 feet for right turns into and out of the site,
with a 5 foot radius on the opposite curb.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 47
8.2.6.3 Access Width - On a two-way access the width shall be no less than 24 feet and
no more than 36 feet. However, where truck traffic is anticipated, the width may
be no more than 40 feet. On a one-way access the width shall be no less than 16
feet and no more than 20 feet.
8.2.7
High Volume Accesses
8.2.7.1 Angle of Intersection - High volume accesses shall intersect the street at an angle
as nearly equaling 90 degrees as site conditions permit. Under special site
conditions, the Planning Board may waive this provision to no less than 70
degrees.
8.2.7.2 Curb Radius - Without channelization islands for right-turn movements into and
out of the site, the curb radii shall be no less than 30 feet and no more than 50
feet. With channelization islands, the curb radii shall be no less than 75 feet and
no more than 100 feet.
8.2.7.3 Entering and existing accesses shall be separated by a raised median which shall
be no less than 6 feet and no more than 10 feet in width. Medians separating
traffic flows shall be no less than 25 feet in length.
8.2.7.4 Access Width - Access widths shall be no less than 20 feet and no more than 30
feet on each side of the median. Right turn only lanes established by a
channelization island shall be no less than 16 feet and no more than 20 feet.
8.2.7.5 Appropriate traffic control signage shall be erected at the intersection of the
access and the street and on medians and channelization islands and shall
conform to the standards for the types of signs or devises set by the Manual on
Uniform Traffic Control Devices (MUTCD).
8.2.8
Special Case Accesses - Special case accesses are one-way or two-way drives serving
medium or high volume uses with partial access (right turn only) permitted. These
accesses are allowed only on roadway segments where there is a raised median and no
median breaks are provided opposite the proposed access. These accesses are usually
located along the approaches to major signalized intersections where a raised median
may be provided to protect left-turning vehicles and separate opposing traffic flows.
8.2.8.1 Perpendicular Driveways
8.2.8.1.1
Curb Radii - Curb radii shall be no less than 30 feet and no
more than 50 feet, with a preferred radius of 50 feet.
8.2.8.1.2
Access Width - Access width shall be no less than 26 feet and
no more than 30 feet. On two-way accesses, a triangular
channelization island shall be provided at the intersection with
the street. On each side of the island the one-way drive shall
be no less than 15 feet and no more than 24 feet.
8.2.8.1.3
Channelization Island - The channelization island on two-way
accesses shall be raised and curbed. Corner radii shall be 2
feet.
8.2.8.2 Skewed Accesses
8.2.8.2.1
Angle of Intersection - Access shall intersect the street at an
angle no less than 45 degrees and no more than 60 degrees.
8.2.8.2.2
Curb Radii - Curb radii shall be no less than 30 feet and no
more than 50 feet on the obtuse side of the intersection. Curb
radii shall be no less than 5 feet and no more than 10 feet on
the acute side of the intersection.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 48
8.2.8.2.3
Access Width - The width of the access shall be no less than
15 feet and no more than 24 feet. Where entering and
exiting access meet, the width shall be no less than 24 feet
and no more than 30 feet.
8.3
ACCESS LOCATION AND SPACING
8.3.1
Minimum Corner Clearance - Corner clearance shall be measured from the point of
tangency (PT) for the corner to the point of tangency for the access. In general the
developer should provide the maximum practical corner clearance possible based on site
constraints. Minimum corner clearances are listed below based upon access or minor
street volume and intersection type.
MINIMUM STANDARDS FOR CORNER CLEARANCE
MINIMUM CORNER CLEARANCE (Feet)
INTERSECTION
INTERSECTION
ACCESS TYPE
SIGNALIZED
UNSIGNALIZED
Low Volume
150
50
Medium Volume
150
50
High Volume
500
250
Special Case
Right turn in only
50
50
Right turn out only
100
100
Right turn in or out only
100
50
Where the minimum standard for a full access drive cannot be met, only special case accesses shall
be permitted. If based on the above criteria, full access to the site cannot be provided on either the
major or minor streets, the site shall be restricted to partial access. Alternately, construction of a
shared access drive with an adjacent parcel is recommended.
8.3.2
Access Spacing - Accesses and street intersections shall be separated from adjacent
accesses, streets and property lines as indicated in the table below, in order to allow major
through routes to effectively serve their primary function of conducting through traffic.
The distance shall be measured from the access point of tangency to the access point of
tangency for spacing between accesses and from the access point of tangency to a
projection of the property line at the edge of the roadway for access spacing to the
property line.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 49
MINIMUM ACCESS SPACING
NOTE: This chart applies to the accesses on the property being developed only
Minimum Spacing to Adjacent Access by Access Type 2 (DSP) 3
MINIMUM
SPACING TO
PROPERTY
HIGH
HIGH
SPECIAL
ACCESS
LINE (DPL) 1
LOW
MEDIUM
w/o RT*
w/RT**
CASE
TYPE
(FEET)
(FEET)
(FEET)
(FEET)
(FEET)
(FEET)
VOLUME
Low
5
***
-
-
-
-
Medium
10
-
75
-
-
-
High-w/o RT*
75
-
75
150
-
-
High-w RT**
75
-
75
250
500
-
Special Case
10
-
75
75
75
40 ****
1
DPL measured from point of tangency of access to projection of property line on roadway edge.
2
For two or more accesses serving a single parcel, or from a proposed access from an existing access.
3
DSP measured from point of tangency of access to point of tangency of adjacent access.
*
High volume access without right turn channelization.
**
High volume access with right turn channelization.
***
Low volume accesses are not permitted in combination with other access types on a single lot.
****
Right turn in only upstream of right turn out only. Right turn out followed by right turn in not
allowed.
8.3.3
Number of Accesses - The maximum number of accesses onto a single street is controlled
by the available site frontage and the table above. In addition, the following criteria shall
limit the number of accesses independent of frontage length.
8.3.3.1 No low volume traffic generator shall have more than two-way access onto a
single roadway.
8.3.3.2 No medium or high volume traffic generator shall have more than two two-way
accesses or three accesses in total onto a single roadway.
8.3.4
Construction Materials/Paving
8.3.4.1 All accesses entering a curbed street shall be curbed with materials matching the
street curbing. Sloped curbing is required around all raised channelized islands
or medians.
8.3.4.2 All accesses shall be paved with bituminous concrete pavement within the street
right-of-way. All commercial accesses regardless of access volume shall be paved
with bituminous concrete pavement within 30 feet of the street right-of-way.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 50
8.4
TRAFFIC SIGNAL STANDARDS
8.4.1
Purpose - Where traffic signals are to be added or modified, the Town seeks to standardize
all equipment and processes associated with traffic signals in order to: enhance the
function of the road network to safely accommodate vehicle, bicycle and pedestrian
movement; facilitate priority movement of emergency vehicles; minimize, economize and
simplify future maintenance and programming and conserve energy.
8.4.2
Required Actions - In addition to actions required elsewhere in these Regulations, the
following actions are required:
a.
For any development which may adversely impact an individual signalized
intersection or group of signalized intersections, a Professional Engineer
specializing in transportation engineering shall evaluate the signal hardware and
programming at each signal and throughout the system if appropriate. The
Engineer shall verify the sufficiency of the current hardware and programming,
and shall offer modifications which improve traffic flow. Interconnection shall be
required where it will improve traffic system function. The function of the traffic
system shall be given higher priority than the function of individual intersections
unless otherwise directed by the Department of Public Works.
b.
Following installations and initial programming, a final operational inspection
shall be made by the designing Professional Engineer to review the effectiveness
of
the
signal
timing,
signal
layout,
construction
and
coordination
timing/operation. The Professional Engineer shall specify adjustments needed to
ensure safe and efficient operation, and shall subsequently provide to the Public
Works Director a written report detailing all aspects of the system.
c.
When a new or replacement traffic signal controller is required, the intersection
shall be equipped with emergency optical pre-emption.
d.
A development which meets both of the following criteria shall provide to the
Town one emergency optical pre-emption emitter:
1.
the development necessitates either the addition of a traffic signal or the
modification of signal programming; and
2.
the development generates 1,000 or more vehicle trips per day in the
summer season.
e.
Modifications to existing traffic signals shall include provisions to replace
substandard equipment with new equipment which meets current specifications.
The extent to which this replacement falls partially or fully upon the applicant
shall be determined by the Planning Board based on the extent of the expected
traffic impact.
8.4.3
Specifications - All traffic signal system design, construction and equipment shall meet the
Town of York standards, as established and periodically updated by the York Public Works
Department.
8.4.4
Required Approval - All traffic signal designs, equipment and programming shall be
reviewed and approved by the Department of Public Works.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 51
ARTICLE 9 ... STREETS, STORM DRAINAGE DESIGN AND EROSION CONTROL
9.1
The Board shall not approve any Site Plan or Subdivision Plan unless proposed streets and
stormwater management systems are designed in accordance with all local Ordinances and the
specifications contained in these regulations. Approval of the Final Plan by the Board shall not be
deemed to constitute or be evidence of acceptance by the municipality of any street or easement.
9.2
All plans submitted shall meet the submission standards outlined in Section 6.4.14.
9.3
Where the developer proposes improvements, at his expense, within existing public streets, the
proposed design and construction details shall be approved in writing by the Superintendent of the
Department of Public Works or the Maine Department of Transportation, as appropriate.
9.4
All plans submitted to the Planning Board will be reviewed by the Town Engineer as described in
Section 2.3.1 and 5.4.5.
9.5
STREET DESIGN STANDARDS
9.5.1
These design standards shall be met by all streets within the subdivisions, and shall control
the roadway, shoulders, curbs, sidewalks, drainage systems, culverts, and other
appurtenances.
9.5.2
Streets shall be designed to discourage through traffic on minor streets within a residential
subdivision.
9.5.3
The arrangement, character, extent, width, grade, and location of all streets shall be
considered in relation to existing or planned streets, topographical conditions, public
convenience and safety, and the proposed use of the land to be served by the street.
Within the parameters of Section 9.5.9, grades of streets shall conform as closely as
possible to the original topography.
9.5.4
The Planning Board may require the reservation of a 50-foot easement connecting the
new street with an external boundary to provide a continuation of the street where future
subdivision is possible. This future street will allow for safe future traffic circulation. In a
case where the subdivision would land lock hitherto accessible land, the 50-foot reserve
strip shall be required by the Planning Board. The Board may also require the reservation
of a twenty-foot easement in an appropriate location to provide continuation of
pedestrian traffic or utilities to the next street. All easements proposed under this
regulation must be deeded to the Town to facilitate their future use for the public good.
(Also see Section 7.5.1).
9.5.5
In the event a residential development is proposed in an area zoned for commercial use,
the street right-of-way and/or the pavement width shall be increased the amount
necessary to bring the street into conformance with the standards for commercial streets
in these regulations.
9.5.6
Adequate off-street loading space, paved to the standards herein, shall be provided in
connection with lots designed for commercial use.
9.5.7
Where a subdivision boarders an existing street below the standards set herein or when
the Comprehensive Plan indicates plans for realignment, widening or improvement of a
street that would require use of some of the land in the subdivision, the Plan must show
areas reserved for this widening, realigning, or improvement. Land reserved for such
purposes may not be counted in satisfying setback, yard, or area requirements of the
Zoning Ordinance.
9.5.8
Developments containing fifteen (15) residential units or more, or which generates
average daily traffic of 150 trips per day or more, shall have at least two street connections
either with existing public streets, or with streets on an approved Subdivision Plan for
which a performance guarantee has been filed and accepted. The reason for this policy is
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 52
to ensure the volume of traffic passing in front of any house on the street remains at a low,
neighborhood-friendly level.
A.
Alternatively, a residential street network may be designed with a central
Collector street with Minor or Alternative Minor streets accessing the Collector
street. No house shall have driveway access onto the collector street. Not more
than 14 residential units shall be permitted on each Minor street. Not more than
9 residential units shall be permitted on each Alternative Minor street. With this
design option, a dead-end collector street shall not be longer than 2,000', and
not more than 50 residential units shall be accommodated on a dead-end
collector street.
9.5.9
The following design standards apply according to street classification:
TYPE OF STREET (4)
DESCRIPTION
ARTERIAL
COLLECTOR
MINOR
ALTERNATIVE
MINOR (3)
IND/COMM
Minimum right-of-way width
80'
60'
50'
50'
80'
Minimum pavement width
Curbed
44'
34'
26'
Not permitted
44'
Uncurbed
44'
24'
20'
18'
44'
Minimum width of shoulders
uncurbed (each side)
3'
3'
3'
2'
3'
Minimum sidewalk width
8'
5'
5'
Not permitted
8'
Minimum grade
.5%
.5%
.5%
.5%
.5%
Maximum grade
5%
6%
7%
10%
5%
Maximum grade within 75' of
any intersection
2%
2%
2%
2%
2%
Minimum centerline radius
800'
300'
150'
150'
800'
Minimum tangent between
curves of reverse alignment
300'
200'
100'
100'
300'
Roadway crown
¼"/ft
¼"/ft
¼"/ft
¼"/ft
¼"/ft
Minimum angle of street
Intersection (1)
90°
90°
88°
88°
90°
Curb radii at intersection
30'
20'
15'
15'
30' (2)
Minimum property line radii
at intersections
20'
10'
10'
10'
20'
Maximum Design Speed
-
-
25 MPH
25 MPH
-
Dead-End Design
n.a.
Cul-de-sac
Cul-de-sac or
hammer head
Hammer head
Cul-de-sac
(1)
Street intersection angles shall be as close to 90° as feasible, but no less than the listed angle
(2)
Should be based on the turning radii of expected commercial vehicles, but no less than 30 feet
(3)
Alternative Minor standards may apply only on dead-end residential streets which provide access to
not more than 9 residential units. All other design and construction standards which apply to Minor
Streets shall apply to streets designed under this alternative. Roads constructed to these standards
shall remain in private ownership because they will not meet standards for public road acceptance.
(4)
Compliance with these standards does not ensure compliance with standards for public acceptance
of streets. Public acceptance of streets is regulated by the Road Specifications Ordinance (which is
scheduled to amended later in 2007). A plan note shall be required for any subdivision which
includes a new road. This note shall indicate whether or not the applicant intends to design the
roads for public road acceptance, and shall offer a warning to potential buyers that Planning Board
approval is not a guarantee of public acceptance of the street.
9.5.10
The centerline of the roadway shall be the centerline of the right-of-way.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 53
9.5.11
Dead-end Streets - In addition to the standards in Section 9.5.9, dead-end streets shall be
constructed so as to provide a cul-de-sac or hammer head turnaround with the following
requirements:
Property line ................................................................................ 75' radius
Outer edge of pavement ......................................................... 60' radius
Inner edge of pavement .......................................................... 40' radius
Hammer head ............................................................................. 60' by 20', designed in accordance
with the following sketch:
Where the cul-de-sac is in a wooded area prior to development, a stand of trees shall be
maintained within the center of the cul-de-sac.
9.5.12
Driveways.
A.
Along any proposed new or reconstructed street or street segment, the design of the
street shall include the design for each driveway along that segment. The design
shall be limited in scope to the portion of the driveway located within the street
right-of-way, and shall ensure that each driveway is designed to accommodate the
project's drainage design and traffic safety. The portion of each driveway in the
street right-of-way shall be constructed at the same time the road and drainage
improvements are constructed to ensure compatibility of design and proper
construction, and the cost of driveway construction within the right-of-way shall be
included in the financial security for the project. These requirements shall be
indicated on the approved plan by means of a plan note.
B.
For a lot proposed for a single-family or duplex dwelling unit, the Board may permit
the applicant to reserve alternative driveway locations for access to the lot. In such
cases, the applicant shall provide a design for each potential driveway, but the
requirement for construction during road construction shall be deferred. An
additional plan note shall be included on the approved plan to indicate this
arrangement. This note shall indicate that the financial security relating to the
driveway will be released to the lot owner upon provision of an inspection report by
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 54
a professional engineer that one of the driveways has been constructed in
accordance with the approved plans, and that all work in the right-of-way is
consistent with the approved plans.
9.5.13
The Comprehensive Plan includes a map which depicts the classification of existing streets
(see Policy 2.4.9). To help ensure that new streets are properly integrated into this system,
the following standards shall apply:
A.
A new arterial street must connect to an existing arterial street.
B.
A new collector street must connect to an existing arterial or collector street.
9.6
GRADES, INTERSECTIONS AND SIGHT DISTANCES
9.6.1
All changes in grade shall be connected by vertical curves in order to provide the
following minimum stopping sight distances based on the street design speed.
Design Speed (mph)
20
25
30
35
Stopping Sight Distance
125
150
200
250
Stopping sight distances shall be calculated with a height of eye at 3 ½ feet and the height
of object at ½ feet.
9.6.2
All new streets or accesses must meet the intersection sight distance requirements
outlined in Article 8.2.3 of these regulations.
9.6.3
Cross (four-cornered) street intersections shall be avoided whenever possible, except as
shown on the Comprehensive Plan or at other important traffic intersections. A distance
of at least two hundred (200) feet shall be maintained between center lines of offset
intersecting streets.
9.6.4
Sidewalks and Curbing
9.6.4.1 The Planning Board shall require sidewalks when the development is within 1
mile of any school. The Board may also require sidewalks in other locations
where appropriate.
9.6.4.2 The Planning Board shall require curbs when the development is located in a
section of Town where curbs are either existing, or are in the vicinity so that it
can be expected the curbs will form a continuum in the near future. Curbs shall
be designed with areas for handicap access.
9.6.4.3 Bituminous Sidewalks - The gravel aggregate sub-base course shall not be less
than 12 inches in thickness. The crushed aggregate base course shall be not less
than 2 inches in thickness. The not bituminous pavement surface course shall be
not less than 2 inches in thickness after compaction.
9.6.4.4 Portland Cement Concrete Sidewalks - The sand base shall be not less than 6
inches in thickness. The Portland Cement concrete shall be reinforced with 6-
inch square number 10 wire mesh and shall be no less than 4 inches in thickness.
9.6.4.5 Granite or Portland Cement concrete curbing shall be installed on a thoroughly
compacted gravel base of six inches minimum thickness. Bituminous curbing
shall be installed on the base course of the pavement. The specified pavement
width shall be measured between the curbs. All curbs shall be vertical except
when sloped curbs are specifically allowed by the Planning Board.
9.7
STREET CONSTRUCTION STANDARDS
9.7.1
Minimum thickness of materials after compaction:
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 55
MINIMUM REQUIREMENTS
STREET MATERIALS
ARTERIAL
COLLECTOR
MINOR
IND/COM
Aggregate sub-base course
(Maximum size stone = 4")
18"
18"
18"
18"
Crushed aggregate base course
4"
3"
3"
4"
Hot bituminous pavement
(after compaction)
Total thickness
3 ¼"
2 ½"
2 ½"
3"
Surface course
1 ½"
1"
1"
1 ¼"
Base course
1 ¾"
1 ½"
1 ½"
1 ¾"
9.7.2
PREPARATION
9.7.2.1 Before any clearing has started on the right-of-way, the center line of the new
street shall be staked and sidestaked at 50-foot intervals. Limits of clearing shall
be marked by stakes or flagging distances from the center line shall be obtained
from the cross sections.
9.7.2.2 Before grading is started, the right-of-way area directly dedicated to the
construction of the roadway and shoulders shall be cleared of all stumps, roots,
brush, and other objectionable material. All ledge, large boulders, and tree
stumps shall be removed from this area.
9.7.2.3 No stumps, wood or organic material shall be covered in the road bed at any
depth and no ledge or large boulders shall be left within 18" of the finished road
surface. Where necessary to facilitate drainage, line of sight or snow removal, all
ledge, large boulders, trees and tree stumps shall be removed from the right of
way to a depth of not less than 12" below the road surface. Street grades shall
conform in general to the natural terrain. On soils which are not suitable for
roadways, the subsoil shall be removed from the street site to a depth of two feet
below the subgrade and replaced with material meeting the specifications for
gravel aggregate sub-base below.
9.7.2.4 Side slopes shall not be steeper than a slope of 3 feet horizontal to 1 foot vertical,
and shall be graded, fertilized, seeded and mulched according to the erosion
control standards in these regulations.
9.7.2.5 New or replacement culverts shall be reinforced, corrugated aluminum alloy,
polymer, or pre-coated galvanized corrugated steel pipe. Culverts and drainage
systems shall be sized to meet the criteria of a 100 year storm event. Culvert
diameter shall not be less than 15", unless 12" is demonstrated to be more
appropriate to the site conditions. Decision to allow culvert diameter size
reduction shall be determined by the Planning Board.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 56
9.7.3
BASES AND PAVEMENT
9.7.3.1 Aggregate Sub-base Course - Gravel aggregate sub-base shall be sand or gravel
of hard durable particles free from vegetative matter, lumps, or balls of clay and
other deleterious substances. The matter shall not contain particles of rock
exceeding four (4) inches in any dimension and shall meet all Type "B" aggregate
requirements of Maine DOT.
Aggregate Base Course - Crushed aggregate base shall not contain particles of
rock that will not pass the two (2) inch square sieve and shall meet all Type "A"
aggregate requirements of Maine DOT.
9.7.3.2 Pavement - Minimum standards for the base layer of pavement shall be the
MDOT specifications for plant mix grade "C" with an aggregate size no more than
1-inch maximum. Minimum standards for the surface layer of pavement shall
meet the MDOT specifications for plant mix grade "D" with an aggregate size no
more than ¾ inch maximum. Where pavement placed joins an existing
pavement, the existing pavement shall be cut along a smooth line to a neat,
even, vertical joint.
9.8
STORMWATER MANAGEMENT
9.8.1
Adequate provision shall be made for disposal of all stormwater generated within the
subdivision, and any drained ground water through a management system of swales,
culverts, underdrains, and storm drains. The stormwater management system shall be
designed to conduct storm water flows to existing watercourses or storm drains. No storm
water shall be permitted to drain across a street or intersection. All aspects of the drainage
plan must be signed and sealed by a Maine Certified Engineer.
9.8.2
All components of the stormwater management system shall be designed to limit the post-
development peak discharge to pre-development levels for 2 year and 100 year , 24 hour
duration storms, frequencies, based on rainfall data for Portland, Maine. When the
subdivision discharges directly into a waterbody, peak discharge may be increased from
pre-development levels provided downstream drainage structures are suitably sized.
9.8.3
Where a subdivision is traversed by an existing stream, river, or surface water
drainageway, or where the Board feels that surface water run-off to be created by the
subdivision should be controlled, there shall be provided public drainage easements with
swales, culverts, catch basins or other means of channeling surface water within the
subdivision and over other properties. The Town shall be provided full right of access to
these easements.
9.8.4
Drainage easements for existing watercourses or proposed drainage ways shall be at least
twenty feet wide and shall conform substantially with the lines of existing natural
drainage. Wider easements will be required where necessary to insure that there can be
vehicular access, all flooding is controlled, and stormwater can be disposed of properly.
9.8.5
Appropriate conveyances for outlets to drainage systems must be provided. Where the
peak run-off from the subdivision onto other properties is increased either in volume,
duration, or direction, easements from the abutting property owners allowing such
discharges shall be obtained.
9.8.6
The minimum pipe size for any storm drainage pipe shall be 15 inches unless 12" diameter
pipe is demonstrated to be more appropriate to the site conditions. Decision to allow pipe
diameter size reduction shall be determined by the Planning Board. Maximum trench
width at the pipe crown shall be the outside diameter of the pipe plus two feet. Pipe shall
be bedded in a fine granular material, containing no stones larger than 3 inches, lumps of
clay, or organic matter, reaching a minimum of six inches below the bottom of the pipe
extending to six inches above the tope of the pipe.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 57
9.8.7
Catch basins shall be of an appropriate size and shall be located generally at the curb line.
Catch basins shall be placed away from the line of traffic flow, but shall be adequate in
design and strength to accommodate vehicular traffic.
9.8.8
The stormwater management system shall be designed to accommodate upstream
drainage, taking into account existing conditions and approved developments. Applicant
shall demonstrate in the Preliminary Application submission the upstream conditions and
any needed improvement. Upstream run-off shall be included in drainage calculations for
the lots under review. The Planning Board may require surplus design capacity, up to a
factor of 50%, if an assessment of site conditions and flooding history indicates a need for
greater capacity.
9.8.9
Existing or future downstream drainage requirements shall be studied to determine the
effect of the proposed subdivision. The storm drainage shall not overload (1) existing
storm drainage systems downstream from the subdivision nor (2) storm drainage systems
downstream from the subdivision which appear on an approved plan but which have not
yet been constructed. The subdivider shall be responsible for financing any improvements
to existing or previously approved drainage systems required to handle the increased
storm flows.
9.8.10
Outlets shall be stabilized against soil erosion by stone riprap or other suitable materials to
reduce storm water velocity. Wherever the storm drainage system is not within the right-
of-way of a public street, perpetual easements shall be provided to the Town allowing
maintenance and improvements of the system.
9.8.11
Where soils require a subsurface drainage system shall be installed to properly drain all
areas where the groundwater level is too high and would cause a hazard to the stability of
the roadway base. The subsurface drainage system shall be installed and maintained
separately from the stormwater drainage system.
9.8.12
All large parking areas (greater than 20 cars) shall be equipped with an oil/water
separation device. The design of such device(s) shall be appropriate for the site on which
it is to be located.
9.8.13. Low Impact Design. Each applicant is required to submit a statement to the Planning
Board documenting proposed Low Impact Design (LID) for the site, which will help to
reduce storm water volumes and help to enhance storm water quality. LID includes, but is
not limited to green roofs, rain gardens, tree wells, infiltration basins, and permeable
pavement. The applicant shall submit technical documentation about the suitability of
such designs with the request for LID features.
9.8.14
Stormwater management structures shall be maintained in perpetuity to function as
specified in the application and accompanying deed covenants. In the event the property
is conveyed, the new owner shall be responsible for maintenance as specified by the
permit and the accompanying deed covenants. Development which disturbs one or more
acres of land is also subject to the Post-Construction Stormwater Management Ordinance,
which includes annual certifications to the Town that the systems are being maintained.
In addition, the town shall have the right to enforce the maintenance requirements or to
maintain the drainage swales and structures at the cost of the owner.
9.9
STORM DRAINAGE CONSTRUCTION STANDARDS
9.9.1
Materials
9.9.1.1 Reinforced Concrete Pipe - Reinforced concrete pipe shall meet the requirements
of ASTM Designation C-76 (AASHTO M 170). Pipe classes shall be required to
meet the soil and traffic loads with a safety factor of 1.2 on the .01-inch crack
strength with a Class B bedding. Joints shall be of the rubber gasket type
meeting ASTM Designation C 443-70, or of an approved performed plastic
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 58
jointing material such as "Ramnek". Perforated concrete pipe shall conform to
the requirements of AASHTO M 175 for the appropriate diameters.
9.9.1.2 Corrugated Metal Pipe - Corrugated Metal Pipe shall be bituminous coated
meeting the requirements of AASHTO Designation M 190 Type "C" for iron or
steel pipe or AASHTO Designation M 196 for aluminum alloy pipe for sectional
dimensions and type of bituminous coating. Pipe gauge shall be as required to
meet the soil and traffic loads with a deflection of not more than 5%.
9.9.1.3 ABS Pipe - ABS (Acrylonitrile-butadiene-styrene) composite pipe and fittings shall
conform to the requirements of AASHTO M 264 and AASHTO M 265. Perforated
pipe shall conform to the requirements of AASHTO M 36, Type III.
9.9.1.4 Corrugated Plastic Pipe - Corrugated plastic pipe shall conform to the
requirements of AASHTO M 252.
9.9.1.5 Manholes - Manholes shall be of precast concrete truncated cone section
construction meeting the requirements of ASTM Designation C 139, radial type.
Bases may be cast in place 3,000 psi 28 day strength concrete or may be of
precast concrete placed on a compacted foundation of uniform density. Metal
frames and traps shall be set in a full mortar bed and with tops shall conform to
the requirements of AASHTO M 103 for carbon steel castings, AASHTO M 105,
Class 30 for gray iron castings or AASHTO M 183 (ASTM A 283, Grade "B" or
better) for structural steel.
9.9.1.6 Catch Basins - Catch basins shall be of precast concrete truncated cone section
construction meeting the requirements of ASTM Designation C 478 or precast
concrete manhole block construction meeting the requirements of ASTM
Designation C 139, radial type. Castings shall be square cast iron sized for the
particular inlet condition with the gratings perpendicular to the curb line. Bases
may be cast in place 3,000 psi 28 day strength concrete or may be of precast
concrete, placed on a compacted foundation of uniform density. Metal frames
and traps shall be set in a full mortar bed and with tops shall conform to the
requirements of AASHTO M 103 for carbon steel castings, AASHTO M 105, Class
30 for gray iron castings or AASHTO M 183 (ASTM A 283, Grade B or better) for
structural steel.
9.9.2
Drain inlet alignment shall be straight in both horizontal and vertical alignment unless
specific approval of a curvilinear drain is obtained in writing from the Board, after
consultation with the Municipal Engineer.
9.9.3
Manholes shall be provided at all changes in vertical or horizontal alignment and at all
junctions. On straight runs, manholes shall be placed at a maximum of 400-foot intervals.
9.9.4
Upon completion each catch basin or manhole shall be cleaned of all accumulation of silt,
debris or foreign matter and shall be kept clean until final acceptance.
9.10
EROSION AND SEDIMENTATION CONTROL STANDARDS
9.10.1
Procedures shall be undertaken during preparatory, construction and cleanup stages, to
prevent soil erosion and water pollution. The Soil Erosion and Sedimentation Plan must be
suitable and specific to the characteristics of the site and proposed development. Soil
erosion control and sedimentation plans must be submitted in sufficient detail so that all
erosion and sedimentation control measures may be properly constructed and maintained
in the field and shall meet or exceed the minimum requirements of this Section. (See
submission requirements at Section 6.4.15). All soil erosion and sedimentation control
plans must meet the requirements of Appendix A of this Regulation, which are at least as
stringent as the Basic Standards of the Maine Department of Environmental Protection
Chapter 500 Stormwater Rules as of October 2022.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 59
9.11
ADDITIONAL IMPROVEMENTS AND REQUIREMENTS
9.11.1
Clean-Up - Following street construction, the developer or contractor shall conduct a
thorough clean-up of stumps and other debris from the entire street right-of-way. All
stumps must be disposed of consistent with Section 7.12 and/or any notations on the face
of the Plan.
9.11.2
Street Name, Street Signs and Street Lights - New streets shall be named in accordance
with York's E911 Ordinance. Street name signs shall be furnished and installed by the
developer. The type, size and location of the signs shall be subject to approval by the
Public Works Department. Street lighting shall be installed as required by the Planning
Board.
9.11.3
Design and Construction Plans
9.11.3.1
Plans and illustrations submitted in accordance with Section 6.4.14 shall
be designed and prepared by a Professional Engineer registered in the
State of Maine. No construction will be permitted until the Planning
Board has approved the plans.
9.11.3.2
Utilities shall be installed prior to the street construction so as to avoid re-
excavation of the finished street.
9.11.3.3
Following construction, "as built" plans must be submitted to the
Department of Public Works.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 60
ARTICLE 10 ... PERFORMANCE GUARANTEE
10.1
TYPES OF PERFORMANCE GUARANTEES
With submittal of the application for final plan approval, the applicant shall provide one of the
following performance guarantees for an amount adequate to cover 125% of the total construction
costs of all required improvements, taking into account the time span of the construction schedule
and the inflation rate for construction costs:
10.1.1
Either a certified check payable to the Town of York or a savings account or certificate of
deposit naming the Town of York as owner, for the establishment of an escrow account.
10.1.2
A performance bond payable to the Town of York issued by a surety company, approved
by the Board of Selectmen or Town Manger.
10.1.3
An irrevocable letter of credit from a financial institution approved by the Board of
Selectmen or Town Manger that establishes funding for the construction of the
subdivision, from which the Town of York may draw if construction is inadequate.
10.1.4
An offer of conditional approval limiting the number of units built or lots sold until all
required improvements have been constructed.
The conditions and amount of the performance guarantee shall be determined by the
Planning Board with the advice of the Town engineer, Code and Planning Department
staff, Town Manager, Attorney or similar Town representative.
10.2
CONTENTS OF GUARANTEE
The performance guarantee shall contain a construction schedule, cost estimates for each major
phase of construction taking into account inflation, provisions for inspections of each phase of
construction, provisions for the release of part or all of the performance guarantee to the
developer, and a date after which the applicant will be in default and the Town of York shall have
access to the funds to finish construction.
10.3
ESCROW ACCOUNT
A cash contribution to the establishment of an escrow account shall be made by either a certified
check made out to the Town of York, the direct deposit into a savings account, or the purchase of a
certificate of deposit. For any account opened by the applicant, the Town of York shall be named
as owner or co-owner, and the consent of the Town of York shall be required for a withdrawal.
Any interest earned on the escrow account shall be returned to the applicant unless the Town of
York has found it necessary to draw on the account, in which case the interest earned shall be
proportionately divided between the amount returned to the applicant and the amount withdrawn
to complete the required improvements.
10.4
PERFORMANCE BOND
A performance bond shall detail the conditions of the bond, the method for release of the bond or
portions of the bond to the applicant, and the procedures for collection by the Town of York. The
bond documents shall specifically reference the application for which approval is sought.
10.5
LETTER OF CREDIT
An irrevocable letter of credit from a bank or other leading institution shall indicate that funds have
been set aside for the construction of the proposed development and may not be used for any
other project or loan.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 61
10.6
CONDITIONAL AGREEMENT
The Board, at its discretion, may provide for the applicant to enter into a binding
agreement with the Town of York in lieu of the other financial performance guarantees. Such an
agreement shall provide for approval of the final plan on the condition that no lots or units are sold
and no building permits may be obtained until either:
10.6.1
It is certified by the Board, or its agent, that all of the required improvements have been
installed in accordance with these regulations and the regulations of the appropriate
utilities; or
10.6.2
A performance guarantee, acceptable to the Town, is submitted in an amount necessary
to cover the completion of the required improvements at an amount adjusted for inflation
and prorated for the portions of the required improvements already installed.
Notice of the agreement and any conditions shall be on the final plan that is recorded at
the Registry of Deeds. Release from the agreement shall follow the procedures for release
of the performance guarantee contained in Section 10.8.
10.7
PHASING OF DEVELOPMENT
The Board may approve plans to develop a major subdivision in separate and distinct phases. This
may be accomplished by limiting final approval to those lots abutting that section of the proposed
subdivision road which is covered by a performance guarantee. When development is phased,
road construction shall commence from an existing public way. Final approval of lots in
subsequent phases shall be given only upon satisfactory completion of all requirements pertaining
to previous phases.
10.8
RELEASE OF PERFORMANCE GUARANTEE
When all required public improvements have been completed according to the standards herein,
the developer may request the Board of Selectmen release the performance guarantee. Prior to the
release of any part of the performance guarantee, the Board of Selectmen shall determine to its
satisfaction, in part upon the report of the Town Engineer and any other agencies and departments
who may be involved, that the proposed improvements meet or exceed the design and
construction requirements for the project or that portion or phase of the development for which
the release is requested. Upon favorable review by the Board of Selectmen they shall vote their
approval of the release of the performance guarantee, and issue such approval in writing to the
developer.
10.9
DEFAULT
If upon inspection, the Town Engineer or other qualified individual retained by the Town finds that
any of the required improvements have not been constructed in accordance with the plans and
specifications filed as part of the application, he or she shall so report in writing to the Code
Enforcement officer, the Board of Selectmen, the Planning Board, and the applicant or builder. The
Board of Selectmen shall take any steps necessary to preserve the Town of York's rights.
10.10
IMPROVEMENTS GUARANTEED
10.10.1 Except as provided below, performance guarantees shall be tendered for all
improvements required to meet the standards of these regulations and for the
construction of the streets, pedestrian amenities, stormwater management facilities, public
sewage collection or disposal facilities and public water systems, and erosion and
sedimentation control measures. In the event that the applicant is required by another
government entity to secure in advance the total cost of installation or completion, such
improvements shall be exempt from inclusion in the performance guarantee provided to
the Town.
10.10.2 A performance guarantee shall be tendered for an amount sufficient to enable the Town
to stabilize the site at any point during construction if the developer is unable to complete
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 62
the project as planned. Stabilization of the site shall consist of any and all grading and
revegetation as may be necessary to return the site to a condition where erosion control
measures are no longer necessary and stormwater impacts on abutting properties are
eliminated. Site stabilization shall also include the capping or removal of any utility or any
partial structure which presents a public health or safety hazard.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 63
ARTICLE 11 ... INSPECTIONS AND ENFORCEMENT
11.1
PROFESSIONAL INSPECTION AND CERTIFICATION OF PROJECT COMPLIANCE
The purpose of this section is to help ensure projects are built in full compliance with design plans
approved pursuant to these Regulations, and to identify non-compliance issues as a way to
enhance and simplify enforcement.
A.
Inspection and Certification by the Design Professionals.
1.
The Planning Board shall be authorized to require each State-licensed design
professional (limited to professional engineers, architects, and landscape architects)
responsible for design elements of an approved plan to provide a written evaluation
with regard to the finished project prior to the issuance of an occupancy permit. This
evaluation shall be based on periodic on-site inspections by the professional(s) during
the construction of the project, and shall explicitly state whether or not the project is
built in full compliance with the approved design plans. Each design professional shall
attest only to those aspects of the plan for which they are responsible. The evaluation
shall be certified by stamp and signature of the professional.
2.
The requirement to provide a written evaluation shall be imposed during the
application-approval process. If a temporary occupancy permit is requested, the CEO
shall require an interim written evaluation. The interim written evaluation shall
evaluate compliance of work performed to date, and shall list remaining work
necessary to complete the project in accordance with the approved plans.
3.
This provision shall be in addition to other inspection requirements authorized by the
Town codes. The cost of compliance with work required pursuant to this Section shall
be the responsibility of the applicant.
B.
Town Inspection. In addition to the inspection and certification procedures for the design
professionals, the Board may require its own periodic inspections by a Professional Engineer
during project construction. The Professional Engineer shall be responsible for observing all
on-site and off-site construction work and site improvements with the exception of
buildings. The engineer shall have no enforcement authority, but shall prepare periodic
reports and provide same to the Planning Board, and is hereby authorized to request that
the Code Enforcement Officer take enforcement actions as necessary to ensure compliance.
This inspection work shall be paid from the inspection fee paid pursuant to §2.3.2.
11.2
VIOLATIONS AND ENFORCEMENT
11.2.1
No depicting a development which would constitute a subdivision as defined herein shall
be filed or recorded in the Registry of Deeds until a Final Plan has been approved and
signed by the Planning Board in accordance
11.2.2
No person, firm, corporation or other legal entity may convey, offer, or agree to convey
any land in an approved subdivision which has not been shown on the Final Plan as a
separate lot, approved by the Planning Board and recorded in the Registry of Deeds,
unless or until the Final Plan has been amended and that amendment approved by the
Planning Board.
11.2.3
Any person, firm, corporation or other legal entity who conveys, offers or agrees to convey
any land in a subdivision which has not been approved as required by these regulations
shall be punished by a fine of not less than $5,000 plus any legal expenses incurred by the
Town in enforcing these regulations for each such conveyance, offering or agreement.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 64
The Attorney General, the municipality, or the appropriate municipal officers may institute
proceedings to enjoin the violation of these regulations.
11.2.4
No public utility, water district, sanitary district or any utility company of any kind shall
serve any Site Plan or lot in a subdivision for which a Final Plan has not been approved by
the Planning Board.
11.2.5
Development of a Site Plan or subdivision without Board approval shall be a violation of
law. Development includes clearing, grading or construction of streets, grading of land or
lots, or construction of buildings which require a final plan approved as provided in these
regulations. No development of a subdivision will be permitted until the Final Plan has
been recorded, and copies returned to the Town pursuant to Section 5.5.1.
11.2.6
Default - Any developer who 1) fails to perform any required improvements in accordance
with any timetable established at the time of final plan approval, 2) completes required
improvements in a manner which, although timely, is not acceptable to the Town, or 3)
maintains a situation that is a hazard to public health and safety shall be deemed in
default. In addition, a developer shall be deemed in default if any required improvement is
not completed in accordance with the plan and all applicable regulations before the
expiration date of any performance guarantee tendered by the developer to the Town
with respect to required improvements. The Town will not be required to initiate action to
exercise its rights under any financial performance guarantee in order to declare a
developer in default. For the purposes of interpreting this paragraph, "hazards to public
health and safety" shall include, but not be limited to, inadequate drainage, stormwater
management, or erosion and sedimentation control measure.
11.2.7
No plan shall be reviewed or approved by the Board as long as the developer is in default
or in violation of any of the provisions on a previously approved plan, as determined
through the process outlined in Section 11.2.6 and 11.2.9.
11.2.8
Before any building permits may be issued, all public improvements must be constructed
to the standards outlined in these regulations and the Final Plan approval, including the
installation of the monumentation as described in Section 7.18. Such determination will
be made through the provisions of Article 11.
11.2.9
It shall be the duty of the Code Enforcement Officer to enforce the provision of these
regulations, and to insure that projects are constructed in strict compliance with the Final
Plan and these regulations. The Code Enforcement Officer is responsible for bringing to
the attention of the Planning Board and Board of Selectmen any violations or lack of
compliance. If at any time during the construction of the development, construction is not
proceeding in accordance with the plan and these regulations, or a hazard to public
health and safety exists, the CEO shall notify the developer in writing of the deficiency and
state the corrective actions necessary and the time period within which corrective action
must be taken. The CEO may specify that no other construction activities shall continue
until the condition is corrected. If this is specified, the developer will be considered to be
in default until the CEO gives notice that the condition is satisfactorily corrected. For
purposes of interpretation of this paragraph, hazards to public health and safety shall
include but not be limited to lack of adequate drainage, stormwater and erosion and
sedimentation control measures.
11.2.10 Any violation of the provisions in these regulations shall be deemed a civil violation,
punishable by law with each day such violation continues constituting a separate offense.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 65
ARTICLE 12 ... WAIVERS
12.1
Where the Board makes written Findings of Fact that there are special circumstances of a particular
development, it may waive portions of these regulations, unless otherwise indicated in the
regulations, to permit a more practical and economical development, provided the public health,
safety, and welfare are protected, and provided the waivers do not have the effect of nullifying the
intent and purposes of the Comprehensive Plan, the Zoning Ordinance, or these regulations, and
provided the criteria of the State Subdivision Law are met. Findings of Fact prepared under this
Section must be consistent with the requirements for Findings of Fact found in 30-A MRSA, Sections
4401 through 4407.
12.2
In granting waivers to any of these regulations in accordance with Section 12.1, the Board shall
require such conditions as will assure the objectives of these regulations are met.
12.3
Whenever the initial approval or any subsequent amendment of a subdivision is based in part on
the granting of a waiver from any applicable subdivision regulation, that fact shall be expressly
noted on the face of the Final Plan to be recorded in the Registry of Deeds. In the case of an
amendment, if no amended plan is to be recorded, a certificate shall be prepared in recordable
form and recorded in the Registry of Deeds. This certificate shall:
a.
Indicate the name of the current property owner;
b.
Identify the property by reference to the last recorded deed in its chain of title; and
c.
Indicate the fact that a waiver, including any conditions on the waiver, has been granted
and the date of that granting.
The waiver will not be valid until recorded as provided in this paragraph. Recording must occur
within 30 days of the final subdivision approval or approval of an amendment or the waiver will be
void.
12.4
All of the provisions of these regulations apply unless specifically waived by the Planning Board and
listed on the plan through the process outlined in Sections 12.1, 12.2, 12.3 and 12.4.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 66
ARTICLE 13 ... APPEALS
13.1
An aggrieved party may appeal the approval or denial of a plan by the Planning Board under these
regulations to the Board of Appeals, within thirty days of the vote of the decision, pursuant to
Charter §7.C.3. The Board of Appeals' decision may be appealed to the York County Superior Court
following the procedure contained in the Zoning Ordinance.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 67
Appendix A Standard Erosion and Sedimentation Control Measures
The Erosion and Sedimentation Control Plan required by this Regulation shall be developed and
implemented to include mandatory minimum standards that are based upon the Maine Department of
Environmental Protection's 06-096 CMR Chapter 500 Stormwater Management Rule Appendices A, B, and C.
Where not otherwise specified in this Appendix, the Erosion and Sedimentation Control Best Management
Practices shall be designed using Performance Standards specified in the Maine Erosion and Sediment
Control BMPs Manual for Designers and Engineers developed by the Maine Department of Environmental
Protection (October 2016 or most current version).
General Standards:
Topsoil shall be considered part of the development. Except for surplus topsoil from streets, parking areas,
and building excavations, topsoil is not to be removed from the site.
Except for normal thinning and landscaping, existing vegetation shall be left intact to prevent soil erosion.
The top of a cut or bottom of a fill section shall not be closer than ten feet to an adjoining property, unless
otherwise specified approved by the Planning Board.
General Timing of Installation and Maintenance until Permanent Stabilization
Only areas going into immediate construction shall be stripped and graded. Sedimentation Control BMPs
must be in place before Construction Activity begins.
-
Additional Erosion and Sedimentation Control BMPs must be phased in as appropriate.
-
Erosion and Sedimentation Control BMPs must remain in place and functional until the
development is permanently stabilized.
-
Adequate and timely maintenance of Erosion and Sedimentation Control BMPs must be conducted
until permanent stabilization is achieved.
1.
Pollution Prevention: Minimize Disturbed Area and protect natural downgradient buffer areas, plus
any areas where stormwater may flow off-site, to the extent practicable. Control stormwater
volume and velocity within the development to minimize soil erosion. Minimize the disturbance of
steep slopes. Control stormwater discharges, including both peak flow rates and volume, to
minimize erosion at outlets. The discharge shall not result in erosion of any open drainage
channels, swales, stream channels or stream banks, as well as upland, coastal or freshwater
wetlands off the development.
a.
Whenever practicable, no disturbance activities shall take place within 50 feet of any
Protected Natural Resource as defined by the Maine DEP Chapter 500 regulations.
b.
If it is not practicable to maintain the 50-foot buffer of no disturbance, the Erosion and
Sedimentation Control Plan must include redundant (at least two) perimeter control
measures that are appropriate for the soil and slope.
2.
Sediment Barriers: Prior to construction, properly install sediment barriers at the downgradient edge
of any area to be disturbed and adjacent to any drainage channels within the Disturbed Area.
Sediment barriers shall be installed downgradient of soil and sediment stockpiles and stormwater
must be prevented from running onto the stockpile. Maintain the sediment barriers by removing
accumulated sediment, or removing and replacing the barrier, until the Disturbed Area is
permanently stabilized. Where a Discharge to a storm drain inlet occurs, you must install and
maintain protection measures that remove sediment from the Discharge. Storm drain inlet
protection must include effective curb inlet or "back throat" protection, where applicable.
3.
Stabilized Construction Entrance: Prior to construction, properly install a stabilized construction
entrance (SCE) at all points of egress from the Disturbed Area of the development. The SCE is
typically a stabilized pad of aggregate, underlain by a geotextile filter fabric, or an engineered track-
out control mat which has been approved by Maine DEP which is used to prevent traffic from
tracking material away from the Disturbed Area of the development onto public ROWs. Maintain
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 68
the SCE until all Disturbed Areas are stabilized. If an alternate SCE has been approved by Maine
DEP, provide proof of this with the application.
4.
Temporary Stabilization:
a. Within 7 days of the cessation of Construction Activities in an area that will not be worked
for more than 7 days, stabilize any exposed soil with mulch, or other non-erodible cover.
b. Stabilize areas within 75 feet of a wetland or waterbody within 48 hours of the initial
disturbance of the soil or prior to any storm event, whichever comes first.
5.
Removal of Temporary Measures: Remove any temporary control measures, such as silt fence,
within 30 days after permanent stabilization is attained. Remove any accumulated sediments and
stabilize.
6.
Permanent Stabilization: If the Disturbed Area of the development or a portion of the Disturbed
Area of the development will not be worked for more than 60 days or has been brought to final
grade, then permanently stabilize the area within 7 days by planting vegetation, seeding, sod, or
through the use of permanent mulch, riprap, or road sub-base. If using vegetation for stabilization,
select the proper vegetation for the light, moisture, and soil conditions; amend the Disturbed Area
subsoils with topsoil, compost, or fertilizers; protect seeded areas with mulch or, if necessary,
erosion control blankets; and schedule sodding, planting, and seeding so to avoid die-off from
summer drought and fall frosts. Newly seeded or sodded areas must be protected from vehicle
traffic, excessive pedestrian traffic, and concentrated runoff until the vegetation is well-established
with 90% cover by healthy vegetation. Newly seeded areas shall be adequately watered during
July and August. If necessary, areas must be reworked and restabilized if germination is sparse,
plant coverage is spotty, or topsoil erosion is evident. Permanent Stabilization Definitions are as
follows:
a. Seeded Areas: For seeded areas, permanent stabilization means a 90% cover of the
Disturbed Area with mature, healthy plants with no evidence of washing or rilling of the
topsoil.
b. Sodded Areas: For sodded areas, permanent stabilization means complete binding of the
sod roots into the underlying soil with no slumping of the sod or die-off.
c.
Permanent Mulch: For mulched areas, permanent mulching means total coverage of the
exposed area with an approved mulch material. Erosion control mix may be used as mulch
for permanent stabilization according to the approved application rates and limitations.
d. Riprap: For areas stabilized with riprap, permanent stabilization means that slopes
stabilized with riprap have an appropriate backing of a well-graded gravel or approved
geotextile to prevent soil movement from behind the riprap. Stone must be sized
appropriately. It is recommended that angular stone be used.
e. Paved Areas: For paved areas, permanent stabilization means the placement of the
compacted gravel subbase is completed, provided it is free of fine materials that may run
off with a rain event.
f.
Ditches, Channels, and Swales: For open channels, permanent stabilization means the
channel is stabilized with a 90% cover of healthy vegetation, with a well-graded riprap
lining, turf reinforcement mat, or with another non-erosive lining such as concrete or
asphalt pavement. There must be no evidence of slumping of the channel lining,
undercutting of the channel banks, or downcutting of the channel.
7.
Winter Construction: Winter construction is Construction Activity performed during the period from
October 1 through April 15. If Disturbed Areas are not stabilized with permanent measures by
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 69
October 1 or new soil disturbance occurs after October 1, but before April 15, then these areas
must be protected and runoff from them must be controlled by the following additional winter
construction measures and restrictions:
a. Site Stabilization: Hay mulch is applied at twice the standard temporary stabilization rate.
At the end of each construction day, areas that have been brought to final grade must be
stabilized. Mulch may not be spread on top of snow.
b. Sediment Barriers: All areas within 75 feet of a Protected Natural Resource must be
protected with a double row of sediment barriers.
c.
Ditch Lines: Ditch lines must be stabilized with an appropriate stone lining backed by an
appropriate gravel bed or geotextile unless specifically released from this standard by the
Maine DEP. If release from Maine DEP has been granted, provide proof of this with the
application.
d. Slopes: Mulch netting must be used to anchor mulch on all slopes greater than 8% unless
erosion control blankets or erosion control mix is being used on these slopes. Unvegetated
slopes less than 8% must be protected with an erosion control blanket, erosion control
mix, or riprap.
e. Areas with winter stabilization shall be reseeded by May 15 or within 30 days of exposure
of the soil, whichever is later.
8.
Stormwater Channels: Each channel shall be constructed in sections so that the section's grading,
shaping, and installation of the permanent lining can be completed the same day. If a channel's
final grading or lining installation must be delayed, then diversion berms must be used to divert
stormwater away from the channel, properly spaced check dams must be installed in the channel
to slow the water velocity, and a temporary lining installed along the channel to prevent scouring.
9.
Sediment Basins: Sediment basins that will be used to control sediment during construction
activities must be designed to provide storage for either the calculated runoff from a 2-year, 24-
hour storm or provide for 3,600 cubic feet of capacity per acre draining to the basin. Outlet
structures must discharge water from the surface of the basin whenever possible. Erosion controls
and velocity dissipation devices must be used if the discharging waters are likely to create erosion.
Accumulated sediment must be removed as needed from the basin to maintain at least half of the
design capacity of the basin. Clearly visible staking must be installed with marks showing the
elevation of half design capacity for easier inspection.
The use of cationic treatment chemicals in Sediment Basins, such as polymers, flocculants, or other
chemicals that contain an overall positive charge designed to reduce turbidity in stormwater may
only be used if proof of approval by Maine DEP is provided.
10. Phasing Plan Requirements: No phasing plan is required if the contractor will limit the Disturbed
Area to a maximum of 5 acres of disturbance across the development at any time. If the
Construction Activity will result in more than 5 acres of Disturbed Area at any one time, the
Contractor shall provide a phasing plan showing:
a. the initial 5-acre area to be disturbed;
b. which portions of the initial disturbance will be stabilized, and what temporary or
permanent stabilization methods will be used;
c.
which areas will be subsequently disturbed and what temporary or permanent
stabilization methods will be used; and
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 70
d. a description of each phase of disturbance and stabilization which clearly describes the
total areas in square feet or acres such that the 5-acre Disturbed Area limit at any one time
is met throughout the entire project.
Inspection, Maintenance and Corrective Action by Applicant On-Site Personnel During Construction
During construction, the following are inspection, maintenance, and corrective action requirements that
must be implemented by the applicant or their on-site representative:
1.
Inspection: Disturbed and Impervious Areas, Erosion and Sedimentation Control BMPs, materials
storage areas that are exposed to precipitation, and locations where vehicles enter or exit the
development are inspected at least once a week, as well as before and within 24 hours after a
storm event (rainfall) and prior to completing permanent stabilization measures. A Qualified Erosion
and Sedimentation Control Professional shall conduct the inspections.
2.
Maintenance and Corrective Action: If Erosion or Sedimentation Control BMPs need to be
maintained, or repaired or enhanced (corrective action), the work shall be initiated upon discovery
of the problem but no later than the end of the next workday. If additional Erosion or
Sedimentation Control BMPs or significant repair of Erosion or Sedimentation Control BMPs are
necessary, implementation must be completed prior to any storm event (rainfall) and within 7
calendar days of identification. All measures must be maintained in effective operating condition
until areas are permanently stabilized.
3.
Documentation: A log (report) summarizing the inspections and any repairs or enhancements
(corrective actions) added must be maintained by the applicant. The log must include the name(s)
and qualifications of the person making the inspections, the date(s) of the inspections, and major
observations about the operation and maintenance of erosion and sedimentation controls,
materials storage areas, and vehicles access points to the Parcel. Major observations must include
Erosion and Sedimentation Control BMPs that need maintenance, Erosion and Sedimentation
Control BMPs that failed to operate as designed or proved inadequate for a particular location, and
location(s) where additional Erosion and Sedimentation Control BMPs are needed. The log must
document each Erosion and Sedimentation Control BMP requiring maintenance, Erosion and
Sedimentation Control BMP needing replacement, and location needing additional Erosion and
Sedimentation Control BMPs, as well as the corrective action taken and when it was taken. The log
shall be maintained for at least three years from the completion of permanent stabilization.
Housekeeping Requirements
1.
Spill Prevention: Controls must be used to prevent pollutants from construction and waste materials
stored on-site from entering stormwater, which includes storage practices to minimize exposure of
the materials to stormwater. The development contractor or operator must develop, and implement
as necessary, appropriate spill prevention, containment, and response planning measures.
2.
Groundwater Protection: During construction, liquid petroleum products and other hazardous
materials with the potential to contaminate groundwater may not be stored or handled in areas of
the development draining to an infiltration area. An infiltration area is any area of the development
that by design or because of soils, topography, and other relevant factors accumulates runoff that
infiltrates into the soil. Dikes, berms, sumps, and other forms of secondary containment that prevent
discharge to groundwater may be used to isolate portions of the development for the purposes of
storage and handling of these materials.
3.
Fugitive Sediment and Dust: Actions must be taken to ensure that activities do not result in
noticeable erosion of soils or fugitive dust emissions during or after construction. Oil may not be
used for dust control, but other water additives may be considered as needed. A stabilized
construction entrance shall be included to minimize tracking of mud and sediment. If off-site
tracking occurs, public roads shall be swept immediately and no less than once a week, as well as
prior to significant storm events. During dry months, operations that experience fugitive dust
problems, shall wet down unpaved access roads once a week, or more frequently as needed, with
a water additive to suppress fugitive sediment and dust.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 71
4.
Debris and Other Materials: Minimize the exposure of construction debris, building and landscaping
materials, trash, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials to
precipitation and stormwater runoff. These materials must be prevented from becoming a pollutant
source. Sediment generated by concrete or mortar mixing, brick cutting and saw cutting activities
must be contained (e.g., sausage boom, straw bales, etc.) and cleaned up using dry methods (i.e.,
sweeping or vacuuming) to prevent it from entering drainage structures or water resources. These
activities shall be done on vegetated areas whenever possible and away from drainage structures
and water resources.
5.
Excavation Dewatering: Excavation dewatering is the removal of water from trenches, foundations,
coffer dams, ponds, and other areas within the construction area that retain water after excavation.
In most cases the collected water is heavily silted and hinders correct and safe construction
practices. The collected water removed from the ponded area, either through gravity or pumping,
must be spread through natural wooded buffers or otherwise treated to collect the maximum
amount of sediment possible, like a coffer dam sedimentation or sediment filter bag. Avoid allowing
this water to flow over Disturbed Areas of the development. If the Maine DEP has approved
equivalent measures, provide proof of approval. Note that discharged excavation dewater fluids
from the development must be visually clear (no visible suspended or settleable solids).
6.
Washout from Concrete, Stucco, Paint, Curing Compounds, or Other Construction Materials: If
washout/cleanout is to be completed on the development, a designated area(s) shall be
established and marked on the Erosion and Sedimentation Control Plan. This area shall be a
minimum of 50 feet from all drainage structures, ditches, waterbodies, and resource areas, as well
as property boundaries. The area shall not have an outlet to discharge wastes or flows. No
detergents shall be used and no vehicles may be washed in this location. A leak-proof pit or
container shall be established in the washout area(s), to which washings shall be directed. This area
shall be used for washout containment and dewatering by evaporation only. The pit shall not allow
infiltration to occur. To prevent clean water from entering the pit, the washout area shall be
covered during precipitation events. Inspections of the pit shall be conducted daily to ensure no
leaks are present and no discharge is occurring.
7.
Authorized Non-stormwater Discharges: Identify and prevent contamination by non-stormwater
Discharges. Where allowed non-stormwater Discharges exist, they must be identified, and steps
shall be taken to ensure the implementation of appropriate pollution prevention measures for the
non-stormwater component(s) of the Discharge. Authorized non-stormwater Discharges are:
a.
Discharges from firefighting activity
b.
Hydrant flushing if dechlorinated to 0.05 mg/l or less
c.
Vehicle wash water if detergents are not used and washing is limited to the exterior of
vehicles (engine, undercarriage, and transmission washing is prohibited)
d.
Dust control runoff, if it does not cause erosion
e.
Routine external building washdown, not including surface paint removal, that does not
involve detergents
f.
Pavement wash water (where spills/leaks of toxic or hazardous materials have not
occurred, unless all spilled material had been removed) if detergents are not used
g.
Uncontaminated air conditioning or compressor condensate
h.
Uncontaminated groundwater or spring water
i.
Foundation or footer drain-water where flows are not contaminated
j.
Uncontaminated excavation dewatering per item 5 Excavation Dewatering
k.
Potable water including waterline flushings
l.
Landscape irrigation
8.
Unauthorized Non-stormwater Discharges: The following Discharges are prohibited:
a.
Wastewater from the washout or cleanout of concrete, stucco, paint, form release oils,
curing compounds, or other construction materials;
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 72
b.
Fuels, oils, or other pollutants used in vehicle and equipment operation or maintenance;
c.
Soaps, solvents, or detergents used in vehicle and equipment washing; and
d.
Toxic or hazardous substances from a spill or other release.
Town of York Site Plan and Subdivision Regulations - Adopted 10/16/90
Revised February 17, 2026
Page 73