Comprehensive current zoning/land-use code (Title 31): districts, permits, DRB review, floodplain (Appendix C) and subdivision regulations; originally adopted 2004-10-18, revised through 2020-11-16, effective 2020-12-08.
Zoning & land use — Rutland, Vermont
What can I build? Do I need a development permit?
The City of Rutland, Vermont has 1 adopted ordinance on file: City of Rutland Land Use Development Regulations (Zoning, Downtown Design Guidelines, Floodplain, Subdivision), verified 2026-09-22.