Building permits — Front of Yonge, Ontario

Do I need a building permit? What does it cost?

In the Township of Front of Yonge, Ontario, building permit rules are set by Township of Front of Yonge By-law #30-26, Consolidated Fee By-law, verified 2026-10-26. Permit fees: $125 + $12/$1000 construction value; minimum fee $125.00; valued at $120/sq.ft. or contractor’s price. Fines: double the cost of building permit.

Township of Front of Yonge By-law #30-26, Consolidated Fee By-law adopted bylaw
permit required for To repair, alter, construct/install pool, install fuel fired appliance and/or chimney, agricultural building; construct a building or an addition; install solar panels; decking; demolition. Schedule “A” — Building
fee basis $125 + $12/$1000 construction value; minimum fee $125.00; valued at $120/sq.ft. or contractor’s price Schedule “A” — Building
fine range double the cost of building permit Schedule “A” — Building
scout note

The Building fee table generally charges $125 plus $12 per $1,000 construction value. Demolition, early occupancy, special inspections and changes of use cost $125 each; annual permit renewal costs $100. Building without a permit doubles the permit fee.