| permit required for | Construction, demolition, change of use, occupancy, sewage systems, farm buildings, designated structures, signs, private swimming pools/hot tubs/fences as specified. | s. 3.1-3.6 |
| fee basis | Set out in Corporations current Fee By-Law; calculated by Chief Building Official for work proposed; floor area basis for finished/unfinished buildings. | s. 8.1; s. 8.2.1-8.2.2 |
| fees location | Corporations current Fee By-Law | s. 8.1 |
| authority | Chief Building Official and inspectors | s. 5; s. 9.4 |
scout note
Municipality of Thames Centre's Building Code Act by-law: permits for construction, demolition, occupancy, change of use, sewage systems and swimming pools; fee/inspection requirements and Chief Building Official code of conduct.