In the City of Charlottetown, Prince Edward Island, building permit rules are set by City of Charlottetown Building Code Bylaw (PH-BC.3) and 1 other bylaw, verified 2026-10-18. Permit required for: Decks attached to buildings and/or at height 600mm or greater above ground level require frost protection and a Building Permit regardless of size. Exemptions: Decks not attached to buildings up to 55m² (592sqft), and at a height less than 600mm to ground level do not require a Building permit. Fees set in: Municipality's Fees Bylaw.
City of Charlottetown Building Code Bylaw (PH-BC.3)
adopted bylaw
permit required for
Decks attached to buildings and/or at height 600mm or greater above ground level require frost protection and a Building Permit regardless of size.
s. 4.6.1
exemptions
Decks not attached to buildings up to 55m² (592sqft), and at a height less than 600mm to ground level do not require a Building permit.
s. 4.6.2
fees location
Municipality's Fees Bylaw
s. 4.2.1
authority
authority having jurisdiction
s. 2.2.1
scout note
Building Code Bylaw enacted under the PEI Building Codes Act; adopts the provincial Building Codes Act and Regulations (National Building Code with amendments) for Charlottetown, repeals the 2018 version, and administers building permits.
Fees Bylaw Schedule D - Planning & Heritage Department Schedule of Fees
adopted bylaw
Residential: $5.50 per $1,000 (minimum of $50); Commercial-Industrial-Institutional-Multi-Unit Residential: $7.00/$8.00/$9.00 per $1,000 (minimum of $50 for all phases); Signage: $8.00 per $1,000 (minimum of $50)
Fees (no HST)
fine range
doubling of the fees charged
doubling of the fees charged
scout note
Building permit fees: residential $5.50 per $1,000 (minimum $50), higher rates for commercial/industrial/institutional/multi-unit; fees double for late filing or work without a permit; refund rules.
Charlottetown Permit Approvals page
City publishes weekly approved building and development permits issued by the Planning and Heritage Department; 21-day IRAC appeal period.